Powered by Deep Web Technologies
Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Last Revision Date: 8/16/2010 Last Merged Filing ID:  

NLE Websites -- All DOE Office Websites (Extended Search)

Revision Date: 8/16/2010 Last Merged Filing ID: Revision Date: 8/16/2010 Last Merged Filing ID: Tariffs, Rate Schedules, and Other Tariff Documents Southwestern Power Administration Tariffs, Rate Schedules, and Other Tariff Documents Document Generated On: 10/1/2010 Contents TABLE OF CONTENTS ....................................................................................................................................1 PREAMBLE: AUTHORITIES AND OBLIGATIONS .............................................................................................1

2

Guided Summarization Results GOOGLE Google Inc Run ID ...  

Science Conference Proceedings (OSTI)

Page 1. Guided Summarization Results GOOGLE Google Inc Run ID: GOOGLE1 Overall Responsiveness 1.000 Overall ...

2012-02-27T23:59:59.000Z

3

Job Title Organization Name Type End Date Job ID Intern -Industrial Engineer Jabil Circuit, Inc. Intern 8/15/2012 36012  

E-Print Network (OSTI)

Job Title Organization Name Type End Date Job ID Intern - Industrial Engineer Jabil Circuit, Inc HVAC Equipment Technical Support Tom Barrow Co. Full-time 7/31/2012 36332 Internship HQ Inc Intern 9

Meyers, Steven D.

4

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

5

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

6

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

7

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

8

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Accumulation Areas (SAAs) or a <90-day storage areas before shipping to a treatment, storage, and disposal facility (TSDF). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL...

9

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

10

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

11

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

award of the (Date) ENERGY STAR: Plant name Plant street address Plant city, state, zip code As documented by the attached Statement of Energy Performance, I affirm that the...

12

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

13

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

14

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

15

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

16

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

17

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

18

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

19

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

20

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

22

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

23

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

24

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

25

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

26

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

27

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

28

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

29

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

30

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

31

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

32

The CDF-II tau physics program triggers, tau ID and preliminary results  

SciTech Connect

The study of processes containing {tau} leptons in the final state will play an important role at Tevatron Run II. Such final states will be relevant both for electroweak studies and measurements as well as in searches for physics beyond the Standard Model. The present paper discusses the physics opportunities and challenges related to the implementation of new set of triggers able to select events containing tau candidates in the final state. They illustrate, in particular, the physics capabilities for a variety of new physics scenarios such as supersymmetry (SUSY), SUSY with Rp-parity violation, with Bilinear parity violation or models with the violation of lepton flavor. Finally, they present the first Run II results obtained using some of the described tau triggers.

C. Pagliarone et al.

2003-11-03T23:59:59.000Z

33

RESULTS OF RADIOLOGICAL I'IEASUREMENTS HIGHT{AYS 18 AI.ID IO4 IN NIAGARA  

Office of Legacy Management (LM)

9s' 9s' RESULTS OF RADIOLOGICAL I'IEASUREMENTS HIGHT{AYS 18 AI.ID IO4 IN NIAGARA az76 rl//.ry' ORNL/RASA.85/ 40 TAKEN AT JUNCTION FALLS, NEH YORK Accesr to the information in thit rcport ir limiled to tho!' inOllateO on tho dl3tribution li3t and to OePartment ot Encrgy and Oepartmcnt ol Enotgy Gontracton This report was prepared as an account of work sponsored by an agency of the United States Government. Neitherth€ U nited StatesGovernment norany agency thereof, nor any of their employees, makes any warranty, express or implied' or assumes any legal liability or responsibility for the accuracy, completenessi or usefulness of any information, apparatus, product, or,process disclosed, or represents that its usewould not inlringe privately owned rights" Reference herein

34

27-ID and 35-ID Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID, Construction Schedule Electrical and PSS work continues on 35-ID-B and C. Will not run the main...

35

Concordant plutonium-241-americium-241 dating of environmental samples: results from forest fire ash  

SciTech Connect

We have measured the Pu, {sup 237}Np, {sup 241}Am, and {sup 151}Sm isotopic systematics for a set of forest fire ash samples from various locations in the western U.S. including Montana, Wyoming, Idaho, and New Mexico. The goal of this study is to develop a concordant {sup 241}Pu (t{sub 1/2} = 14.4 y)-{sup 241}Am dating method for environmental collections. Environmental samples often contain mixtures of components including global fallout. There are a number of approaches for subtracting the global fallout component for such samples. One approach is to use {sup 242}/{sup 239}Pu as a normalizing isotope ratio in a three-isotope plot, where this ratio for the nonglobal fallout component can be estimated or assumed to be small. This study investigates a new, complementary method of normalization using the long-lived fission product, {sup 151}Sm (t{sub 1/2} = 90 y). We find that forest fire ash concentrates actinides and fission products with {approx}1E10 atoms {sup 239}Pu/g and {approx}1E8 atoms {sup 151}Sm/g, allowing us to measure these nuclides by mass spectrometric (MIC-TIMS) and radiometric (liquid scintillation counting) methods. The forest fire ash samples are characterized by a western U.S. regional isotopic signature representing varying mixtures of global fallout with a local component from atmospheric testing of nuclear weapons at the Nevada Test Site (NTS). Our results also show that {sup 151}Sm is well correlated with the Pu nuclides in the forest fire ash, suggesting that these nuclides have similar geochemical behavior in the environment. Results of this correlation indicate that the {sup 151}Sm/{sup 239}Pu atom ratio for global fallout is {approx}0.164, in agreement with an independent estimate of 0.165 based on {sup 137}Cs fission yields for atmospheric weapons tests at the NTS. {sup 241}Pu-{sup 241}Am dating of the non-global fallout component in the forest fire ash samples yield ages in the late 1950's-early 1960's, consistent with a peak in NTS weapons testing at that time. The age results for this component are in agreement using both {sup 242}Pu and {sup 151}Sm normalizations, although the errors for the {sup 151}Sm correction are currently larger due to the greater uncertainty of their measurements. Additional efforts to develop a concordant {sup 241}Pu-{sup 241}Am dating method for environmental collections are underway with emphasis on soil cores.

Goldstein, Steven J [Los Alamos National Laboratory; Oldham, Warren J [Los Alamos National Laboratory; Murrell, Michael T [Los Alamos National Laboratory; Katzman, Danny [Los Alamos National Laboratory

2010-12-07T23:59:59.000Z

36

,"Eastport, ID Natural Gas Pipeline Imports From Canada (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Eastport, ID Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2012 ,"Release Date:","172014" ,"Next...

37

II.CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

1 1 II.CONTRACT ID CODE ~AGE 1 of AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT PAGES AC 5. PROJECT NO. (If applicable) 3. EFFECTNE DATE 2. AMENDMENTfMODIFICA TION NO. 4. REQUISITIONIPURCHASE REQ. NO. See Block 16c. NOPR 7. ADMINISTERED BY (If other than Item 6) CODE 05008 6. ISSUED BY CODE 05008 U.S. Department of Energy National Nuclear Security Administration U.S. Department of Energy National Nuclear Security Administration P.O. Box 2050 Oak Ridge, TN 37831 P.O. Box 2050 Oak Ridge, TN 37831 9A. AMENDMENT OF SOLICITATION NO. 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Y-12, LLC P.O. Box 2009 MS 8014 9B. DATED (SEE ITEM 11) Oak Ridge, TN 37831-8014 lOA. MODIFICATION OF CONTRACT/ORDER NO.

38

BLDG. ID NAME  

NLE Websites -- All DOE Office Websites (Extended Search)

a: main site Building Inventory 2006 appendices BLDG. ID NAME (B)UILDING (T)RAILER MAP GRID REF SIzE (GSF) 002 Advanced Materials Lab B D&24; &24;5,506 002A Central Chemical Storage B D&24;...

39

T ID CODE I  

National Nuclear Security Administration (NNSA)

I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 10A. MODIFICATION OF CONTRACTIORDER NO. DE-AC52-06NA25396 3. EFFECTIVE DATE See...

40

Issue Date: Expiration Date:  

E-Print Network (OSTI)

Discussion: Enclosed for your review and comment are the draft revisions to the FSME Procedure SA-103, Reviewing the Common Indicator, Technical Staffing and Training. SA-103 procedure describes the process and guidelines to be used by IMPEP team members when reviewing the adequacy of an NRC Region or States program for the staffing and training of technical personnel. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Training; Robert J. Lewis; Robert J. Lewis; A. Duncan White

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE Patents Database - Search Results  

Office of Scientific and Technical Information (OSTI)

Issue Date between 07/06/2013 and 01/06/2014 Issue Date between 07/06/2013 and 01/06/2014 Sorted By: Issue Date, Descending Results: 1-25 of exactly 581 matches. Page 1 of 24 Next » Show only (√) Items Clear all (√) Items Refine Search Patent Title Inventor(s) Issue Date Patent Number Full Text A multiprocessor system supports multiple concurrent modes of speculative execution. Speculation identification numbers (IDs) are allocated to speculative threads from a pool of available numbers. The pool is divided into domains, with each domain being assigned to a mode of speculation. Modes of speculation include TM, TLS, and rollback. Allocation of the IDs is carried out with respect to a central state table and using hardware pointers. The IDs are used for writing different versions of speculative results in different ways of a set in a cache memory.

42

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INL/EXT-08-13979 INL/EXT-08-13979 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB National SCADA Test Bed Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 November 2008 INL/EXT-08-13979 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB Program November 2008 Idaho National Laboratory Idaho Falls, Idaho 83415 http://www.inl.gov Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under DOE Idaho Operations Office Contract DE-AC07-05ID14517 Common Cyber Security Vulnerabilities Observed in Control System Assessments by the INL NSTB

43

DOE/ID-Number  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INEEL/EXT-04-02423 INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Prepared by: Idaho National Engineering and Environmental Laboratory INEEL/EXT-04-02423 ABB SCADA/EMS System INEEL Baseline Summary Test Report J. R. Davidson M. R. Permann B. L. Rolston S. J. Schaeffer November 2004 Idaho National Engineering and Environmental Laboratory INEEL National Security Division Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Office of Energy Assurance Under DOE Idaho Operations Office Contract DE-AC07-99ID13727 ABB SCADA/EMS System INEEL Baseline Summary Test Report INEEL/EXT-04-02423 November 2004 ABSTRACT The Idaho National Engineering and Environmental Laboratory

44

wyp_brochure.id  

NLE Websites -- All DOE Office Websites (Extended Search)

scientific and technical staff scientific and technical staff are eager to celebrate with your students. Classroom presentations are free of charge. Contact Nancy Lanning, edreg@fnal.gov or 630-840-5588. Please provide: * Your name, telephone and e-mail address. * Presentation requested. * Date of request. * Grade level and number of students. * School name. * A map to the school. Coinciding with the 100th anniversary

45

11. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 PAGE 1 OF2 AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE M191 See Block 16C 4. REQUISITION/PURCHASE I 5. PROJECT NO. (If applicable) REQ. NO. 6.ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 87185-5400 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Pantex Site Office P.O. Box 30030 Amarillo, TX 79120 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 CODE I FACILITY CODE SA. AMENDMENT OF SOLICITATION NO.

46

4-ID-D Instrumentation  

NLE Websites -- All DOE Office Websites (Extended Search)

4-ID-D Instrumentation Detectors Integrating Counting Area Diffractometors 8-Circle 4Tesla Magnet 13 Tesla Magnet Focussing Zone Plate Optics K-B Mirror System Temperature Control...

47

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

September 10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho...

48

DOE/ID-Number  

NLE Websites -- All DOE Office Websites (Extended Search)

fuel-use airports. Figure 1-1 shows Airport "A" eGSE payback results in years for fossil fuel escalation rates from 0 to 20% per annum. In this case, the model was run for a...

49

DOE/ID-11037  

NLE Websites -- All DOE Office Websites (Extended Search)

26 Montana Montana Table B-53. Summary of results of water energy resource assessment of Montana. Federally Excluded (MWa) Other Excluded (MWa) 3,406 1,054 2,915 793 104 33 2,811...

50

DOE/ID-11037  

NLE Websites -- All DOE Office Websites (Extended Search)

into technology classes. Table B-4. Summary of results of feasibility assessment of water energy resources in Alabama. (a) Total Feasible Projects 2,428 Microhydro 2,008 83%...

51

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

52

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

53

Category:Boise, ID | Open Energy Information  

Open Energy Info (EERE)

ID ID Jump to: navigation, search Go Back to PV Economics By Location Media in category "Boise, ID" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Boise ID Idaho Power Co.png SVFullServiceRestauran... 61 KB SVHospital Boise ID Idaho Power Co.png SVHospital Boise ID Id... 62 KB SVLargeHotel Boise ID Idaho Power Co.png SVLargeHotel Boise ID ... 66 KB SVLargeOffice Boise ID Idaho Power Co.png SVLargeOffice Boise ID... 58 KB SVMediumOffice Boise ID Idaho Power Co.png SVMediumOffice Boise I... 63 KB SVMidriseApartment Boise ID Idaho Power Co.png SVMidriseApartment Boi... 61 KB SVOutPatient Boise ID Idaho Power Co.png SVOutPatient Boise ID ... 62 KB SVPrimarySchool Boise ID Idaho Power Co.png SVPrimarySchool Boise ... 62 KB SVQuickServiceRestaurant Boise ID Idaho Power Co.png

54

File:INL-geothermal-id.pdf | Open Energy Information  

Open Energy Info (EERE)

id.pdf id.pdf Jump to: navigation, search File File history File usage Idaho Geothermal Resources Size of this preview: 380 × 600 pixels. Full resolution ‎(3,458 × 5,456 pixels, file size: 1.67 MB, MIME type: application/pdf) Description Idaho Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Idaho File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:24, 16 December 2010 Thumbnail for version as of 12:24, 16 December 2010 3,458 × 5,456 (1.67 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

55

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

56

Document ID Number: RL-721  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: RL-721 REV 4 NEPA REVIEW SCREENING FORM DOE/CX-00066 I. Project Title: Nesting Bird Deterrent Study at the 241-C Tank Farm CX B3.8, "Outdoor Terrestrial Ecological and Environmental Research" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform an outdoor, terrestrial ecological research study to attempt to control and deter nesting birds at the 241-C Tank Farm. This will be a preventative study to test possible methods for controlling &/or minimizing the presence and impacts of nesting birds inside the tank farm. A nesting bird

57

RL·721 Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Document ID Number: Document ID Number: REV 3 NEPA REVIEW SCREENING FORM DOE/CX-00045 . J.proj(;l~t Titl~: - - - -- - - - - - - - - - - - - - - - - - -- --------- ------_. . _ - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - LIMITED FIREBREAK MAINTENANCE ON THE HANFORD SITE DURING CALENDAR YEAR 2012 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): The Department of Energy (DOE) proposes to perform firebreak maintenance in selected areas of the Hanford Site during calendar year 2012 with limited use of physical, chemical, and prescribed burning methods. Prescribed burning will be performed by the Hanford Fire Department under approved burn plans and permits; and only in previously disturbed

58

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

59

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Federal ID Credential Security Standard Strengthens ...  

Science Conference Proceedings (OSTI)

Federal ID Credential Security Standard Strengthens Authentication, Extends To Mobile Devices. From NIST Tech Beat: September 5, 2013. ...

2013-09-17T23:59:59.000Z

62

27-ID and 35-ID Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Pentagon F 2 week look-ahead (pdf) Long Range Schedule (pdf) LOM 438 Pentagon F, Construction Schedule Dates 416 to 607 Planned construction activities, please refer to the...

63

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

64

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

SOLICITATIONIMODIFICATION OF CONTRACT I '. SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

65

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

26, 2013 26, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) July 31, 2013: The Idaho Treatment Group, LLC (ITG), the managing contractor for the Advanced Mixed Waste Treatment Project received a warning letter from the State of Idaho's Department of Environmental quality regarding self- reported RCRA permit violations which

66

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

January 6, 2014 January 6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Notable Accomplishments: Contracting companies supporting EM's cleanup program and the Office of Nuclear Energy at the Idaho site volunteered to be among the first to use a new DOE

67

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2013 18, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, 2013: A manager at the Advanced Mixed Waste Treatment Project (AMWTP) determined that the AMWTP Safety Analysis process required review due to an operational trend of fire/combustion events in the Treatment Facility (TF) box lines. Safety analysis for the TF is

68

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

MM-Group Home MM-Group Home MMG Advisory Committees 6-ID-D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights LuFeO Unlikely route to ferroelectricity May 16, 2012 A new type of ferroelectric, LuO2Fe4, has been investigated at the APS by a research team from Julich research center. XAS & XMCD studies on beamline 4-ID-C determined the Fe magnetism and valence, while single crystal x-ray scattering measurements at 6-ID-B & 6-ID-D probed the associated structural and charge ordering.

69

APS Beamline 6-ID-B,C  

NLE Websites -- All DOE Office Websites (Extended Search)

B,C Home B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. Research on this beamline centers on general x-ray scattering studies of materials. The beamline has 2 end-stations: 6-ID-B: Psi -Diffractomter & In-Field Studies 6-ID-C: UHV in-situ growth Recent Research Highlights LSMO pictures Searching for Next-Generation Electronic Materials December 14, 2009 A new class of layered oxide materials discovered thanks to research at the beamline 6-ID-B offers scientists unprecedented opportunities for creating the next generation of electronic devices. Local Contact: Phil Ryan Local Contacts: Philip Ryan (Surface Diffraction) 630.252.0252 ryan@aps.anl.gov

70

BUDGET KEY DATES  

Science Conference Proceedings (OSTI)

BUDGET KEY DATES. For Immediate Release: December 15, 2009. Contact: Diane Belford 301-975-8400. Budget Key Dates.

2013-06-16T23:59:59.000Z

71

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

72

Property:WFSPTurbineID | Open Energy Information  

Open Energy Info (EERE)

WFSPTurbineID WFSPTurbineID Jump to: navigation, search Property Name WFSPTurbineID Property Type Number This is a property of type Number. Pages using the property "WFSPTurbineID" Showing 25 pages using this property. (previous 25) (next 25) A Alleghany High School Wind Project + 110,608 + Appanoose Elementary School Wind Project + 108,442 + Auburn-Washburn Wind Project + 105,237 + Avery County High School Wind Project + 110,607 + B Bancroft-Rosalie Public Schools Wind Project + 108,812 + Bloomfield Public Schools Wind Project + 110,699 + Burlington High School Wind Project + 107,678 + C CAES Wind Project + 105,329 + Cedar Rapids Wind Project + 105,272 + Cherry Valley Elementary School Wind Project + 120,342 + Concordia High School Wind Project + 108,482 +

73

1-ID: Sector 1, Insertion Device Beamline  

NLE Websites -- All DOE Office Websites (Extended Search)

1-ID beamline schematic 1-ID beamline schematic ID on-axis brilliance values 1-ID - Sector 1, Insertion Device Beamline Responsible Scientists Jon Almer, phone: (630) 252-1049, e-mail: almer@aps.anl.gov Sarvjit Shastri, phone: (630) 252-0129, e-mail: shastri@aps.anl.gov John Okasinski, phone: (630) 252-0162, e-mail: okasinski@aps.anl.gov Peter Kenesei, phone: (630) 252-0133, e-mail: kenesei@aps.anl.gov Scientific Programs Coupled high-energy SAXS/WAXS studies (HE-SAXS/WAXS) High-energy diffraction microscopy (HEDM) Single-grain studies Stress/strain/texture studies Pair-distribution function (PDF) measurements High-energy fluorescence Source Characteristics Upstream insertion device: APS Undulator A No. of Poles 72 Undulator Period 3.3 cm Device Length 2.4 m Minimum Gap 11 mm Downstream insertion device

74

IPS: IDS or IPS: what is best?  

Science Conference Proceedings (OSTI)

Intrusion detection systems (IDS) have become one of the most common countermeasures in the network security arsenal. But while other technologies such as firewalls and anti-virus provide proactive protection, most current IDSs are passive; detection ...

Maria Papadaki; Steven Furnell

2004-07-01T23:59:59.000Z

75

DOI-BLM-ID-I020-2012-0017-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-I020-2012-0017-CX DOI-BLM-ID-I020-2012-0017-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-I020-2012-0017-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Environmental Analysis Type CX Applicant Idaho Geological Survey Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 272 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Idaho Falls District Office Managing Field Office BLM Pocatello Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 10/21/2011

76

DOI-BLM-ID-110-2009-3825-CE | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-110-2009-3825-CE DOI-BLM-ID-110-2009-3825-CE Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-110-2009-3825-CE CX at Crane Creek Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Crane Creek Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 113 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Application Date 6/4/2009

77

Department of Energy Idaho - Inside DOE-ID  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Mission and Vision Brief History of the Idaho National Laboratory (INL) Strategic Plan Idaho Operations Office (DOE-ID) - 888 KB DOE-ID Agreement in Principle...

78

Id-1 and Id-2 genes and products as markers of epithelial cancer  

DOE Patents (OSTI)

A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

Desprez, Pierre-Yves (El Cerrito, CA); Campisi, Judith (Berkeley, CA)

2008-09-30T23:59:59.000Z

79

Annual Planning Summaries: Idaho Operations Office (ID) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home Annual Planning Summaries: Idaho Operations Office (ID) Annual Planning Summaries: Idaho Operations Office (ID)...

80

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I '. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I '. I '. CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 12 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 I I 90. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENT/MODIFICATION NO. MI67 9A. AMENDMENT OF SOLICITATION NO. I 1 DE-AC04-00AL66620 100. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Biolog(TM) ID as compared to 16S ribosomal RNA ID for environmental isolates from the deep subsurface  

SciTech Connect

The U.S. Dept of Energy (DOE) Subsurface Microbial Culture Collection (SMCC) contains nearly 10,000 strains of microorganisms isolated from terrestrial subsurface environments. Many of the aerobic, gram-negative, chemoheterotrophs isolated from the DOE Savannah River Site (SRS) have previously been identified by phylogenetic analysis of 16S ribosomal RNA (rRNA) gene nucleotide sequences. These SMCC isolates are currently being examined using Biolog GN Microplates and the Biolog Microstation System in order to gain knowledge of their metabolic capabilities and to compare Biolog IDs with 16S IDs. To accommodate the particular needs of these subsurface isolates, which are often incapable of growing under high-nutrient conditions, Biolog's recommendations for inoculating isolates into Biolog GN Microplates have been altered. The isolates are grown on low nutrient media, sodium thioglycolate (3mM) is added to the culture media to inhibit capsule formation, and a low density of bacteria is inoculated into the microplate. Using these altered inoculation criteria, 60 percent of these SMCC isolates have a Biolog genus ID that matches the 16S rRNA ID. These results indicate that the Biolog System can be a good means of identifying unusual environmental isolates, even when recommended inoculation procedures are altered to accommodate particular isolate needs.

McKinsey, P.C.

2000-05-05T23:59:59.000Z

82

DOE-ID Operations Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

when the worker's equipment unintentionally came in contact with an energized 120V transformer. The unintentional contact did not result in any shock or injury to the worker. The...

83

Location-based security for ID document and ID card enrollment stations  

Science Conference Proceedings (OSTI)

Much of today's security for financial assets, services, facilities, personal information, immigration, employment and travel is provided in the form of a variety of ID instruments such as passports, credit cards, ID badges, access cards, and other similar ... Keywords: RFID, identity management systems, identity verification, location-based security, physical unclonable functions

Eugene P. Gerety; Khaled M. Elleithy

2011-04-01T23:59:59.000Z

84

APS Beamline 6-ID-D  

NLE Websites -- All DOE Office Websites (Extended Search)

D Home D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science Division (XSD) of the Advanced Photon Source. This is a high energy (50 - 130 keV) beamline used for structural studies primarily on single crystal materials. Recent Research Highlights A New Family of Quasicrystals A New Family of Quasicrystals June 24, 2013 Scientists from the U.S. Department of Energy's Ames Laboratory and Iowa State University have used the high energy x-rays available on beamline 6-ID-D, to confirm the structure of the only known magnetic rare earth icosahedral binary quasicrystals. Contacts: Alan Goldman & Paul Canfield - Iowa State Univ. & Ames Lab Local Contacts:

85

Requesting a Digital ID | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requesting a Digital ID Requesting a Digital ID Requesting a Digital ID Step One - Registering with MIS To request a DOE Digital Identity you must first register in DOE's Management Information System (MIS) by going to https://mis.doe.gov, selecting "Requesting Access" and following the onscreen instructions. Note: DOE Federal employees are already registered and do not need to complete this step, they may skip to step 2. During the registration process you will be required to search for, and select, a DOE sponsor. Your DOE sponsor is the DOE federal employee that is certifying that you have a recognized relationship with the Department and have a valid need for a DOE Digital Identity. For contractors this person is often your Contract Task Manager, Contracting Officer's Representatives

86

Radiocarbon dating, memories, and hopes  

SciTech Connect

The history of radiocarbon dating from 1939 to the present is reviewed. The basic principles of radiocarbon dating are that cosmic rays make living things radioactive with {sup 14}C to a certain level fixed by the environment and that at death the intake of food stops so no replenishment of the {sup 14}C steadily lost by the immutable decay occurs. Therefore measurement of the degree of decay gives the time lapse since death, i.e., the radiocarbon age. The equipment developed and experiments performed to measure the specific activity of specimens to be dated are described. The results obtained by world-wide experimenters are discussed. These showed that on simultaneity radiocarbon dating is apparently reliable but that absolute dates may be incorrect by as much as 600 to 700 y. The value of radiocarbon dating to archaeologists, geologists, climatologists, and historians is stressed. (LCL)

Libby, W.F.

1972-01-01T23:59:59.000Z

87

File:USDA-CE-Production-GIFmaps-ID.pdf | Open Energy Information  

Open Energy Info (EERE)

ID.pdf ID.pdf Jump to: navigation, search File File history File usage Idaho Ethanol Plant Locations Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 212 KB, MIME type: application/pdf) Description Idaho Ethanol Plant Locations Sources United States Department of Agriculture Related Technologies Biomass, Biofuels, Ethanol Creation Date 2010-01-19 Extent State Countries United States UN Region Northern America States Idaho External links http://www.nass.usda.gov/Charts_and_Maps/Ethanol_Plants/ File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:13, 27 December 2010 Thumbnail for version as of 16:13, 27 December 2010 1,650 × 1,275 (212 KB) MapBot (Talk | contribs) Automated bot upload

88

Finding Utility Companies Under a Given Utility ID | OpenEI Community  

Open Energy Info (EERE)

Finding Utility Companies Under a Given Utility ID Finding Utility Companies Under a Given Utility ID Home > Groups > Developer Jayhuggins's picture Submitted by Jayhuggins(15) Member 22 June, 2012 - 09:39 Utility+Utility Access Map Here's a quick way to find all the utility company pages under a given utility id. From the Special Ask page, in the query box enter the following: [[Category:Utility Companies]][[EiaUtilityId::15248]] substituting your utility id of interest for 15248, and click "Find results". Groups: Developer Login to post comments Jayhuggins's blog Latest blog posts Rmckeel The utility rate database version 1 API is now deprecated Posted: 6 Sep 2013 - 14:00 by Rmckeel Jweers New Robust References! Posted: 7 Aug 2013 - 18:23 by Jweers 1 comment(s) 1 of 10 ›› Groups Menu You must login in order to post into this group.

89

T-642: RSA SecurID update to Customers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: RSA SecurID update to Customers 2: RSA SecurID update to Customers T-642: RSA SecurID update to Customers June 9, 2011 - 12:45am Addthis PROBLEM: Certain characteristics of the attack on RSA indicated that the perpetrator's most likely motive was to obtain an element of security information that could be used to target defense secrets and related IP, rather than financial gain, PII, or public embarrassment. PLATFORM: RSA SecurID implementations ABSTRACT: RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products. reference LINKS: Open Letter to RSA Customers (update) CVE-2011-0322 RSA Fraud Resource Center RSA Security Practice DOE-CIRC T-640: RSA Access Manager Server CVE-2011-0322 Update

90

National ID project of Nepal: future challenges  

Science Conference Proceedings (OSTI)

Nepal is a small, landlocked and developing country in South Asia. It is bordered by China at North and India at South, East and West. The Government of Nepal, in order to achieve good governance and social-economic development, has initiated the e-Government ... Keywords: Nepal, challenges, government, national ID

Ganesh Prasad Adhikari

2011-09-01T23:59:59.000Z

91

Material Safety Data Sheet MSDS ID NO.: 0137SPE012  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Material Safety Data Sheet Material Safety Data Sheet MSDS ID NO.: 0137SPE012 Revision date: 05/25/2011 1. CHEMICAL PRODUCT AND COMPANY INFORMATION Product name: Speedway E85 Synonym: Speedway ED75/ED85; E-75; E75; E-85; E85; Ethanol/Gasoline Fuel Blend; Fuel Ethanol ED75/ED85 Chemical Family: Gasoline/Ethanol Formula: Mixture Manufacturer: Speedway LLC P.O. Box 1500 Enon, OH 45501 Other information: 419-421-3070 Emergency telephone number: 877-627-5463 2. COMPOSITION/INFORMATION ON INGREDIENTS E85 is a mixture of ethyl alcohol and gasoline that is approved for use in an automobile spark ignition engine. Can contain small amounts of dye and other additives (>0.02%) which are not considered hazardous at the concentrations used. Product information: Name CAS Number

92

OMB No. 1905-0175 Expiration Date: 12/31/2011 Version No ...  

U.S. Energy Information Administration (EIA)

DATE:--Resubmission EIA ID NUMBER:7 Bbls/Day Entering Wet Gas Gas Liquids Exiting Wet Gas Gas Liquids If exiting, is the pipeline able to accept raw, ...

93

Microsoft Word - DOE-ID-INL-12-003.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-12-003 EC Document No.: DOE-ID-INL-12-003 SECTION A. Project Title: Auxiliary Canal Fill Project at Test Reactor Area (TRA)-670 SECTION B. Project Description: Although the ATR canal meets all design basis criteria, lessons learned following the earthquake and tsunami events at the Fukushima- Daiichi Nuclear Power Plant in March of 2011 indicate that an auxiliary water supply to the fuel storage canal with a fill connection located outside of the facility would have been valuable following the beyond design basis event. As a result of these lessons learned, the Department of Energy (DOE) has allocated additional funding to the Idaho National Laboratory (INL) to mitigate beyond design basis events similar to the Fukushima-Daiichi disaster. The Auxiliary Canal Fill Project is one of the projects being funded from this

94

Microsoft Word - DOE-ID-INL-12-016.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No.: DOE-ID-INL-12-016 No.: DOE-ID-INL-12-016 SECTION A. Project Title: Reverse Osmosis System Removal SECTION B. Project Description: The project will remove a reverse osmosis water treatment system (FU-HA-101) from TAN 681 room 182. The system is out-of-service, with no intent of future use. Work will involve removal of the reverse osmosis system, and associated plumbing/piping and electrical lines and conduit. The project will clear the area of obstacles and tripping hazards associated with unused/unnecessary equipment and utilities. SECTION C. Environmental Aspects / Potential Sources of Impact: Generating and Managing Waste: Project activities will result in generation of an estimated 90 cubic ft. of low-level radioactive waste. Wastes will be characterized and dispositioned through Waste Generator Services. Reuse and recycling of materials will be practiced

95

DOI-BLM-ID-T020-2012-0003-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-ID-T020-2012-0003-CX DOI-BLM-ID-T020-2012-0003-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-T020-2012-0003-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Twin Falls District Office Managing Field Office BLM Burley Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

96

Date (13-18)Campus Employee ID (4-12) PERSONAL DATA FORM  

E-Print Network (OSTI)

/STATE EMPLOYMENT (Include ERDA Labs) Employed From - To MO DY YR MO DY YR Campus / Lab Department / Agency as required by law. Individuals have the right to review their own records in accordance with University

Leistikow, Bruce N.

97

11. CONTRACT ID CODEI PAGE1OF1 3. EFFECTIVE DATE (M/DIY)  

E-Print Network (OSTI)

IMANAGEMENT PROGRAM CONSENSUAL LISTENING-IN TO OR RECORDlNG TELEPHONE! RADIO CONVERSATIONS IRADIATION Modification No. M484 SF-30 Continuation Page Page 2 of2 CRD 0 150.1, "Continuity of Programs" CRD M 200.2-3A, "Special Access Program Policies, Procedures and Responsibilities" CRD 0 580.1, "Department

98

Property:NEPA ApplicationDate | Open Energy Information  

Open Energy Info (EERE)

ApplicationDate ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate" Showing 25 pages using this property. (previous 25) (next 25) C CA-670-2010-107 + 17 December 2008 + D DOI-BLM-CA-ES-2013-002+1793-EIS + 17 February 2010 + DOI-BLM-ID-110-2009-3825-CE + 4 June 2009 + DOI-BLM-ID-220-2009-EA-3709 + 12 February 2009 + DOI-BLM-ID-I020-2012-0017-CX + 21 October 2011 + DOI-BLM-NM-L000-2012-0046-CX + 4 January 2012 + DOI-BLM-NV-B020-2008-0071-DNA + 21 February 2008 + DOI-BLM-NV-B020-2008-????-?? + 11 April 2008 + DOI-BLM-NV-B020-2008-????-CX + 29 September 2008 + DOI-BLM-NV-B020-2009-0030-CX + 11 December 2008 + DOI-BLM-NV-B020-2010-0106-CX + 15 December 2009 +

99

Property:DSIRE/Id | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:DSIRE/Id Jump to: navigation, search This is a property of type String. DSIRE Incentive Code. Pages using the property "DSIRE/Id" Showing 25 pages using this property. (previous 25) (next 25) 2 2003 Climate Change Fuel Cell Buy-Down Program (Federal) + US04F + 3 30% Business Tax Credit for Solar (Vermont) + VT31F + A AEP (Central and North) - CitySmart Program (Texas) + TX141F + AEP (Central and North) - Residential Energy Efficiency Programs (Texas) + TX116F + AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) + TX119F + AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) + TX141F + AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) + TX138F +

100

DOI-BLM-ID-B010-2010-??-CX | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » DOI-BLM-ID-B010-2010-??-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-B010-2010-??-CX CX at Weiser Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Environmental Analysis Type CX Applicant Agua Caliente LLC Geothermal Area Weiser Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Decision Document Date 9/30/2010

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Property:GBIG/GreenButtonID | Open Energy Information  

Open Energy Info (EERE)

GreenButtonID Jump to: navigation, search This is a property of type String. Retrieved from "http:en.openei.orgwindex.php?titleProperty:GBIGGreenButtonID&oldid509348" What...

102

Microsoft Word - DOE-ID-INL-11-005.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

protective equipment (PPE) where practical. DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL LABORATORY Page 2 of 2 CX Posting No.: DOE-ID-INL-11-005 Releasing Contaminants - Diesel...

103

Microsoft Word - DOE-ID-INL-12-015.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

direction of Waste Generator Services (WGS). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL LABORATORY Page 2 of 2 CX Posting No.: DOE-ID-INL-12-015 Releasing Contaminants - The...

104

Microsoft Word - DOE-ID-INL-13-028.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

and therefore, waste associated DOE-ID-NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: DOE-ID-INL-13-028 with project activities is...

105

Microsoft Word - DOE-ID-INL-13-025.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

2 of 4 EC Document No.: DOE-ID-INL-13-025 DOE-ID-NEPA CX DETERMINATION Idaho National Laboratory Page 3 of 4 EC Document No.: DOE-ID-INL-13-025 All conduit located on the...

106

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

107

Entity Name: ABC Company Entity ID:  

Gasoline and Diesel Fuel Update (EIA)

Entity Name: Entity Name: ABC Company Entity ID: 00000 Data Year: 2013 State Include or exclude pre-arranged interruptions? 1 2 3 Do you capture outage records for events that initiate outside your system (customer system that causes di 4 5 6 7 8 Point to calculation in P1782: use percentages weighted based upon the classification of the circuit. 9 10 11 12 REWORD: The percent of customers automatically reported when they have lost power? e.g. SCADA, AMI, Etc. 13 SAIDI value (w/o Major Events included) FORM EIA-861 OMB No. 1905-0129 ANNUAL ELECTRIC POWER INDUSTRY REPORT

108

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ( I. ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I. ID CODE / DE-ACO4-OOAL6662O ' 10s. DATED (SEE ITEM 13) PAGE I OF 2 PAGES Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE

109

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

110

Medical Records Retrieval Track results University Of Utah  

Science Conference Proceedings (OSTI)

Page 1. Medical Records Retrieval Track results University Of Utah Summary Statistics Run ID BMIUOUens Prcessing ...

2013-02-12T23:59:59.000Z

111

Beamline 6-ID-D Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 2011 2010 2009 2008 All Sector 6 Pubs. APS Pubs. Database Recent 6-ID-D Publications Publications 2013:(24) "Controlling Size-Induced Phase Transformations Using Chemically Designed Nanolaminates," Matt Beekman, Sabrina Disch, Sergei Rouvimov, Deepa Kasinathan, Klaus Koepernik, Helge Rosner, Paul Zschack, Wolfgang S. Neumann, David C. Johnson, Angew. Chem. Int. Ed. 52, 13211 (2013). "Thermophysical and Structural Measurements of Liquid Metallic Alloys Using Electrostatic Levitation," James Christopher Bendert, Ph.D.-Thesis, Washington University , 2013. "Pair distribution function analysis of X-ray diffraction from amorphous spheres in an asymmetric transmission geometry: application to a Zr58.5Cu15.6Ni12.8Al10.3Nb2.8 glass," J.C. Bendert, N.A. Mauro, K.F. Kelton, J. Appl. Crystallogr. 46, 999

112

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

113

Beamline 4-ID-D Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 2012 2011 2010 2009 2008 All Sector 4 Pubs. APS Pubs. Database Recent 4-ID-D Publications Publications 2013:(13) "Classical and quantum phase transitions revealed using transport and x-ray measurements," Arnab Banerjee, Ph.D.-Thesis, University of Chicago, 2013. "Charge transfer and multiple density waves in the rare earth tellurides," A. Banerjee, Yejun Feng, D.M. Silevitch, Jiyang Wang, J.C. Lang, H.-H. Kuo, I.R. Fisher, T.F. Rosenbaum, Phys. Rev. B 87, 155131 (2013). "Local structure, stripe pinning, and superconductivity in La1.875Ba0.125CuO4 at high pressure," G. Fabbris, M. Hücker, G.D. Gu, J.M. Tranquada, D. Haskel, Phys. Rev. B 88, 060507(R) (2013). "Different routes to pressure-induced volume collapse transitions in

114

SLAC Dosimeter / ID Request Form A  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 Feb 2009 (updated 13 May 2010) SLAC-I-760-0A07J-006-R010 1 of 2 SLAC Dosimeter / ID Request Form A (For applicants who have completed SLAC Environment, Safety, and Health Training) Sections 1-5 completed by applicant. Section 1: Contact Information Last name: First name: MI: Male Female Birth year (yyyy): Job title: Contact information/mailing address: City: State: Zip code: Country: Dept/Group: Phone number: Mail stop: Users or non-SLAC employees only: List employer, company, or university : Section 2: Identification Badge Request I am applying for my first SLAC identification badge; I have successfully completed the following ES&H training (indicate all that apply): SON SOC EOESH GERT RWT I RWT II

115

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTRACT ID CODE CONTRACT ID CODE Babcock & Wilcox Technical Services Pantex, LLC 9B. DATED (SEE ITEM 11) PO Box 30020 Amarillo, T X 79120 PAGE 1 OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I I DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 2. AMENDMENTIMODIFICATION NO. MI74 9A. AMENDMENT OF SOLICITATION NO. extended. CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

116

Facility Representative Program ID Selects FR of the Year  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Program ID Selects Facility Representative Program ID Selects FR of the Year John Martin DOE-ID Facility Representative John Martin DOE-ID Facility Representative of the Year. John Martin was selected as DOE-ID's Facility Representative of the Year and the office's nominee for the 2007 DOE Facility Representative of the Year Award. John was selected from an exceptional field of candidates to represent DOE-ID at the Facility Representative Annual Workshop in Las Vegas this May. Each year the Department of Energy recognizes the Facility Representative whose achievements during the calendar year are most exemplary. A panel of senior personnel representing the Office of Health, Safety and Security (HSS) National Nuclear Security Administration (NNSA), Environmental Management (EM), Science (SC), Nuclear Energy (NE) and at least five

117

Microsoft Word - DOE-ID-INL-12-015.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 15 SECTION A. Project Title: Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement SECTION B. Project Description: The purpose of this project is to permanently close and remove the Materials and Fuels Complex (MFC) 4,000 gallon bio-diesel underground storage tank (UST) [Site ID# 7230/Facility ID # 6-120614/Tank ID # 99ANL00013] and remove the 1,000 gallon E-85 aboveground storage tank (AST) [Site ID# 7230/Facility ID# 6-120614/Tank ID# 05MFC00035] and replace the two tanks with a 10,000 gallon aboveground storage tank (AST) split tank (5,000 gallons for bio-diesel/5,000 gallons for E-85). The 4,000 gallon bio-diesel UST and the 1,000 gallon E-85 AST are located in the parking lot area near building MFC-701.

118

11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

11. CONTRACT ID CODE 11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 258 6. ISSUED BY CODE 3. EFFECTIVE DATE See Block 16C 05008 4. REQUISITION/PURCHASE REQ. NO. 7. ADMINISTERED BY (If other than Item 6) 15. PROJECT NO. (If applicable) CODE 1 0 5 0 0 8 NNSA/Oakridge Site Office NNSA/Oakridge Site Office U.S. Department of Energy U. S. Department of Energy NNSA/Y-12 Site Office NNSA/Y-12 Site Office P.O. Box 2050 P.O. Box 2050 Building 9704-2 Building 9704-2 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No., str**t, county, SIal. and ZIP Code) ABCOCK & WILCOX TECHNICAL SERVICES Y-12, ttn: WILLIE J. WILSON o BOX 2009 02 SCARBORO RD. , Nl.149/MS 8004 AK RIDGE TN 378318004

119

Mobile ID Device Best Practice Recommendation Version 1.0  

Science Conference Proceedings (OSTI)

Page 1. Mobile ID Device Best Practice Recommendation Version 1.0 Shahram Orandi R. Michael McCabe Information Access Division ...

2012-03-11T23:59:59.000Z

120

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

National Nuclear Security Administration (NNSA)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

AMENDMENT OF SOLICITATIONIMODIFICATlON OF CONTRACT ( I- CONTRACT ID CODE PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

( ( I- CONTRACT ID CODE PAGE I OF 2 PAGES I . . Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 2. AMENDMENTIMODIFICATION NO. M I 51 Albuquerque, NM 87185-5400 I Amarillo, TX 79120 90. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 3. EFFECTIVE DATE See Block 16C 9A. AMENDMENT OF SOLICITATION NO. extended. 6 . ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Su~pport Department P.O. Box 5400 CODE FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning -

122

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

123

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

124

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

125

Certification of Timesharing LOGON ID Owner Responsibilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FORM AD-798 FORM AD-798 (3-78) Section 1 - Section 2 - Section 3 - Section 4 - Section 5 - Hi - 3 Dates (Include all Within-Grade Increases) (Begin with most recent date in Card 20) Service Periods For Which Retirement Deductions Were Withdrawn (Begin with old- est period in Card 30) Service Periods For Which Retirement Deductions Were Not Withheld (Begin with old- est period in Card 40) Periods of Separation Prior to 10/1/56 (Begin with most recent date in Card 50) Request Number 1 45 49 50 20 30 40 50 / / / / / / / / / / / / / / / / / / / / / / / / 21 31 41 51 / / / / / / / / / / / / / / / / 22 32 42 52 / / / / / / / / / / / / / / / / 23 33 43 53 / / / / / / / / / / / / / / / / 24 34 44 54 / / / / / / / / / / / / / / / / 25 35 45 55 / / / / / / / / / / / / / / / / 26 36 46 56 / / / / / / / / / / / / / / / / 27 37 47 57 / / / / / / / / / / / / / / / / 28 38 48 58 / / / / / / / / / / / / / / / / 29 39 49 59 / / / / / / / / / / / / / / / / 11 11 11 11 12 12 12 12 13 13 13 13 18 18 18 18 19 19 19 19 24 24 24 24 25 25 25 29 29 29 30 30 30 32 32 32 33 33 33 35 35 35 52 53 58 59 62 63 68 69 70 75

126

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

127

Date: _______________ Vendor Name: _______________________________  

E-Print Network (OSTI)

: ________________________ City, State, Zip:_______________________ Phone # : __________________ Fax, Nuclear Magnetic Resonance e. ___ Fire Safety-Extinguishing Systems, Bldg. Security Alarm Systems on ReX Released Re-released Faxed to Purchasing Date Initials 6-15-11 REV 0.00 0.00 0.00 0.00 0.00 0

Fabrikant, Sara Irina

128

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-001-C NEPA ID No.: PXP-10-0005 Operations Systems Development & Integration Application of DOE NEPA Procedure: The Categorical Exclusion B1.7, Applicable to Facility Operations...

129

A database of anomalous traffic for assessing profile based IDS  

Science Conference Proceedings (OSTI)

This paper aims at proposing a methodology for evaluating current IDS capabilities of detecting attacks targeting the networks and their services. This methodology tries to be as realistic as possible and reproducible, i.e. it works with real attacks ... Keywords: KDD'99, ROC curves, attack traces, statistical evaluation of IDS

Philippe Owezarski

2010-04-01T23:59:59.000Z

130

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

131

Release Date: August 2010 Next Release Date: August 2011  

U.S. Energy Information Administration (EIA)

Release Date: August 2010 Next Release Date: August 2011 U.S. Energy Information Administration/Renewable Energy Annual 2008 Table 1.14 Total Biomass Electricity Net ...

132

IDS Climate Change and Development Centre Resources | Open Energy  

Open Energy Info (EERE)

IDS Climate Change and Development Centre Resources IDS Climate Change and Development Centre Resources Jump to: navigation, search Tool Summary Name: IDS Climate Change and Development Centre Resources Agency/Company /Organization: Institute of Development Studies Sector: Energy, Land Topics: Policies/deployment programs Resource Type: Workshop, Publications, Training materials, Lessons learned/best practices References: Institute of Development Studies CCDC[1] Logo: IDS Climate Change and Development Centre Resources CCDC promotes "collaborative research and policy analysis, delivering high quality research programmes, knowledge services, teaching and training." References ↑ "Institute of Development Studies CCDC" Retrieved from "http://en.openei.org/w/index.php?title=IDS_Climate_Change_and_Development_Centre_Resources&oldid=375095"

133

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

134

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

135

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

136

GRR/Section 5-ID-a - Drilling and Well Development | Open Energy  

Open Energy Info (EERE)

ID-a - Drilling and Well Development ID-a - Drilling and Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-ID-a - Drilling and Well Development 05IDADrillingWellDevelopment.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies IC §42-233: Appropriation of Water, Geothermal IC §42-4003: Permits IC §42-4004: Processing Applications IC §42-4011: Name of Owner Triggers None specified Click "Edit With Form" above to add content Best Practices Community outreach Talk to the local county Potential Roadblocks Incomplete applications result in longer approval times by IDWR 05IDADrillingWellDevelopment.pdf Error creating thumbnail: Page number not in range.

137

Automatic ID heat load generation in ANSYS code  

SciTech Connect

Detailed power density profiles are critical in the execution of a thermal analysis using a finite element (FE) code such as ANSYS. Unfortunately, as yet there is no easy way to directly input the precise power profiles into ANSYS. A straight-forward way to do this is to hand-calculate the power of each node or element and then type the data into the code. Every time a change is made to the FE model, the data must be recalculated and reentered. One way to solve this problem is to generate a set of discrete data, using another code such as PHOTON2, and curve-fit the data. Using curve-fitted formulae has several disadvantages. It is time consuming because of the need to run a second code for generation of the data, curve-fitting, and doing the data check, etc. Additionally, because there is no generality for different beamlines or different parameters, the above work must be repeated for each case. And, errors in the power profiles due to curve-fitting result in errors in the analysis. To solve the problem once and for all and with the capability to apply to any insertion device (ID), a program for ED power profile was written in ANSYS Parametric Design Language (APDL). This program is implemented as an ANSYS command with input parameters of peak magnetic field, deflection parameter, length of ID, and distance from the source. Once the command is issued, all the heat load will be automatically generated by the code.

Wang, Zhibi

1992-04-30T23:59:59.000Z

138

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

139

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

140

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Property:HPBD/ProjectId | Open Energy Information  

Open Energy Info (EERE)

ProjectId ProjectId Jump to: navigation, search This is a property of type Number. Pages using the property "HPBD/ProjectId" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + 203 + High Performance Buildings Database + 358 + High Performance Buildings Database + 71 + High Performance Buildings Database + 833 + High Performance Buildings Database + 247 + High Performance Buildings Database + 20 + High Performance Buildings Database + 498 + High Performance Buildings Database + 132 + High Performance Buildings Database + 194 + High Performance Buildings Database + 323 + High Performance Buildings Database + 50 + High Performance Buildings Database + 785 + High Performance Buildings Database + 223 +

142

2010 Annual Planning Summary for Idaho Operations Office (ID...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Idaho Operations Office (ID) More...

143

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

144

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

145

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

146

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

147

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

148

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

149

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

150

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

151

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

152

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

153

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

154

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

155

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

156

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

157

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

158

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

159

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

160

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

AMENDMENT OF SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE  

National Nuclear Security Administration (NNSA)

SOlLICITATION/MODIFICATlON OF CONTRACT I SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) DE-AC04-00AL66620 I I IOB. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. MI41 9A. AMENDMENT OF Sol-ICITATION NO. CODE I ~ H L I L I I Y L U U ~ I I - 11. THlS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS 1. l l is not The above numbered solicitation is amended as set forth in Item 14. The hour and date specified- receipt of Offers is extendec 3. EFFECTIVE DATE See Block 16C . - extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center

162

AMENDMENT OF SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

SOlLICITATION/MODIFICATlON OF CONTRACT I SOlLICITATION/MODIFICATlON OF CONTRACT I I. CONTRACr ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM 1 1 ) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) DE-AC04-00AL66620 I I IOB. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. MI41 9A. AMENDMENT OF Sol-ICITATION NO. CODE I ~ H L I L I I Y L U U ~ I I - 11. THlS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS 1. l l is not The above numbered solicitation is amended as set forth in Item 14. The hour and date specified- receipt of Offers is extendec 3. EFFECTIVE DATE See Block 16C . - extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center

163

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

164

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I, CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I, CONTRACT ID CODE I, CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 9B. DATED (SEE ITEM I I ) 8. NAME AND ADDRESS OF CONTRACTOR (No.. street, county, state, ZIP Code) I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 2. AMENDMENTIMODIFICATION NO. M I 3 8 9A. AMENDMENT OF SOLICITATION NO. extended. 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

165

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I. CONTRA'T ID CODE  

National Nuclear Security Administration (NNSA)

CONTRA'T ID CODE CONTRA'T ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 / Amarillo, TX 79120 I I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENTIMODIFICATION NO. M I 0 8 9A. AMENDMENT OF SOLICITATION NO. DE-AC04-00AL66620 1 1 108. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

166

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I. CONTRA'T ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTRA'T ID CODE CONTRA'T ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 / Amarillo, TX 79120 I I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENTIMODIFICATION NO. M I 0 8 9A. AMENDMENT OF SOLICITATION NO. DE-AC04-00AL66620 1 1 108. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

167

Property:EiaUtilityId | Open Energy Information  

Open Energy Info (EERE)

EiaUtilityId EiaUtilityId Jump to: navigation, search This is a property of type String. Pages using the property "EiaUtilityId" Showing 25 pages using this property. (previous 25) (next 25) 3 3 Phases Energy Services + 21093 + 4 4-County Electric Power Assn + 6641 + A A & N Electric Coop + 84 + A & N Electric Coop (Virginia) + 84 + AEP Generating Company + 343 + AEP Texas Central Company + 3278 + AEP Texas North Company + 20404 + AES Eastern Energy LP + 134 + AGC Division of APG Inc + 261 + AP Holdings LLC + 56571 + AP Holdings LLC (New York) + 56571 + APN Starfirst, L.P. + 50153 + APN Starfirst, L.P. (Illinois) + 50153 + APN Starfirst, L.P. (Ohio) + 50153 + APN Starfirst, L.P. (Texas) + 50153 + APNA Energy + 55841 + ARCO Products Co-Watson + 867 +

168

Building Energy Software Tools Directory: ID-Spec Large  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-Spec Large ID-Spec Large ID-Spec Large is software for the electrical installation design of industrial and tertiary buildings. It helps to design a green electrical installation by enabling the user to: - Assess the impact of selecting energy efficiency solutions like power factor correction and low losses transformers in terms of cost savings - Reduce power losses and consequently carbon emissions in the electrical installation by optimizing equipment locations - Reduce investment cost while using less raw materials by optimizing length and cross-section of cables - Assess the percentage of recyclable materials for cables and busbar trunking systems. Screen Shots Keywords Electrical installation design, power losses assessment, CO2 emissions, quantity of conductors

169

Microsoft Word - DOE-ID-INL-13-006.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID-NEPA CX DETERMINATION ID-NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad. Standard new crossarms and insulators will be installed on the existing 138kV H structures (underbuild) to support standard aluminum conductors steel reinforced (ACSR) conductors for the majority of the configuration change (approximately from Pole 40E to Pole 127E - an

170

Intergral Drive Systems AG IDS | Open Energy Information  

Open Energy Info (EERE)

Intergral Drive Systems AG IDS Intergral Drive Systems AG IDS Jump to: navigation, search Name Intergral Drive Systems AG (IDS) Place Zurich, Swaziland Zip CH-8005 Sector Wind energy Product Zurich based producer of power electronics systems for wind turbines, PV plants, and propulsion systems. Coordinates 47.37706°, 8.53955° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.37706,"lon":8.53955,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

171

Search Results Quadrats  

NLE Websites -- All DOE Office Websites (Extended Search)

2arr.lasso121112 5:07:23 PM Search Results Quadrats Public Quadrats Data collected by the public with the guidance of docents. Click the Quadrat Id to view more details about...

172

SampleID: 53051 Test Date: 4/17/2010 mean,std_dev,n,m1 ...  

Science Conference Proceedings (OSTI)

... 233.2,48238 231.57,3.09294762322286,5,233.2,230.49,227.77,230.49,235.91, 48241 240.5,3.92874025611264,5,238.7,242.2,241.1,245.5,235 ...

2012-10-09T23:59:59.000Z

173

Balanced binary trees for ID management and load balance in distributed hash tables  

Science Conference Proceedings (OSTI)

We present a low-cost, decentralized algorithm for ID management in distributed hash tables (DHTs) managed by a dynamic set of hosts. Each host is assigned an ID in the unit interval [0, 1). At any time, the set of IDs splits the interval into disjoint ... Keywords: DHT, ID management, P2P, binary tree, distributed hash table, load balance, peer to peer

Gurmeet Singh Manku

2004-07-01T23:59:59.000Z

174

Final Report: DOE/ID/14215  

SciTech Connect

The proposed straw separation system developed in the research project harvests the large internode sections of the straw which has the greater potential as a feedstock for lignocellulosic ethanol production while leaving the chaff and nodes in the field. This strategy ensures sustainable agriculture by preventing the depletion of soil minerals, and it restores organic matter to the soil in amounts and particle sizes that accommodate farmers needs to keep tillage and fertilizer costs low. A ton of these nutrient-rich plant tissues contains as much as $10.55 worth of fertilizer (economic and energy benefits), in terms of nitrogen, phosphorus, potassium, and other nutrients provided to the soil when incorporated by tillage instead of being burned. Biomass conversion to fermentable sugars for the purpose of producing fuels, chemicals, and other industrial products is well understood. Most bioenergy strategies rely on low-cost fermentable sugars for sustainability and economic viability in the marketplace. Exploitation of the whole cropspecifically, wheat straw or other plant material currently regarded as residue or wasteis a practical approach for obtaining a reliable and low-cost source of sugars. However, industrial-scale production of sugars from wheat straw, while technically feasible, is plagued by obstacles related to capital costs, energy consumption, waste streams, production logistics, and the quality of the biomass feedstock. Currently available separation options with combine harvesters are not able to achieve sufficient separation of the straw/stover and chaff streams to realize the full potential of selective harvest. Since ethanol yield is a function of feedstock structural carbohydrate content, biomass anatomical fractions of higher product yield can have a significant beneficial impact on minimum ethanol selling price. To address this advanced biomass separation computation engineering models were developed to more effectively and efficiently engineer high-fidelity and high throughput separation systems for biomass components. INL and Iowa State University developed a computational modeling strategy for simulating multi-phase flow with an integrated solver using various computational fluid dynamics (CFD) codes. ISU set up a classic multi-phase test problem to be solved by the various CFD codes. The benchmark case was based on experimental data for bubble gas holdup and bed expansion for a gas/solid fluidized bed. Preliminary fluidization experiments identified some unexpected fluidization behavior, where rather than the bed uniformly fluidizing, a blow out would occur where a hole would open up in the bed through which the air would preferentially flow, resulting in erratic fluidization. To improve understanding of this phenomena and aid in building a design tool, improved computational tools were developed. The virtual engineering techniques developed were tested and utilized to design a separation baffle in a CNH combine. A computational engineering approach involving modeling, analysis, and simulation was used in the form of virtual engineering to design a baffle separator capable of accomplishing the high-fidelity residue separation established by the performance targets. Through the use of the virtual engineering model, baffle designs were simulated to (1) determine the effect of the baffle on the airflow of the combine cleaning system, and (2) predict the effectiveness of the baffle in separating the residue streams. A baffle design was selected based on the virtual engineering modeling, built into the INL selective harvest test combine. The result of the baffle changes improved the crop separation capability of the combine, enabling downstream improvement in composition and theoretical ethanol yield. In addition, the positive results from the application of the virtual engineering tools to the CNH combine design resulted in further application of these tools to other INL areas of research. INL and the University of Idaho identified, characterized, and modified a key plant biosynt

Kenneth Bryden; J. Richard Hess; Thomas Ulrich; Robert Zemetra

2008-08-18T23:59:59.000Z

175

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

I CONTRACT ID CODE Babcock & Wilcox Technical Services Pantex, LLC 9B. DATED (SEE ITEM 11) PO Box 30020 Amarillo, T X 79120 PAGE 1 OF 2 PAGES Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I I DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 2. AMENDMENTIMODIFICATION NO. MI74 9A. AMENDMENT OF SOLICITATION NO. extended. CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

176

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ID PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

/ ' / ' ID PAGE I OF 2 PAGES - . Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 2 . AMENDMENTIMODIFICATION NO. MI50 9A. AMENDMENT OF SOLICITATION NO. 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

177

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I ' CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

' ' CONTRACT ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 PAGE 1 OF 12 PAGES 9B. DATED (SEE ITEM 11) 5. PROJECT NO. (If applicable) 4. REQUlSlTlONlPURCHASE REQ. NO. 2. AMENDMENTIMODIFICATION NO. MI39 extended. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 3. EFFECTIVE DATE See Block 16C CODE I FACILITY CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

178

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ID PAGE I OF 2  

National Nuclear Security Administration (NNSA)

/ ' / ' ID PAGE I OF 2 PAGES - . Albuquerque, NM 87185-5400 I Amarillo, TX 79120 I ( DE-AC04-00AL66620 10B. DATED (SEE ITEM 13) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & W ~ ~ C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 2 . AMENDMENTIMODIFICATION NO. MI50 9A. AMENDMENT OF SOLICITATION NO. 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACTIORDER NO. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

179

Dates Fact Sheet.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

crossing. This enhances an asset owner's situational awareness capability beyond simple event detection and log management. The DATES monitoring platform uses multiple algorithms...

180

Next Release Date: September 2012  

Annual Energy Outlook 2012 (EIA)

October 2010 DOEEIA-0121 (201002Q) Next Release Date: September 2012 Revised: July 2012 Quarterly Coal Report April - June 2010 October 2010 U.S. Energy Information...

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Fact Sheet: Detection and Analysis of Threats to the Energy Sector (DATES)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Detection and Analysis of Threats Detection and Analysis of Threats to the Energy Sector (DATES) A groundbreaking integrated capability in intrusion detection, security event management, and sector-wide threat analysis Detecting cyber attacks against digital control systems quickly and accurately is essential to energy sector security. Current intrusion detection systems (IDS) continuously scan control system communication paths and alert operators of suspicious network traffic. But existing IDS, often not tailored to the control environment, typically offer limited attack response capability and frequently produce false alarms or fail to alert. Without carefully deployed monitoring, these devices can produce an overwhelming number of alarms

182

ORNL 2011-G00219/jcn UT-B ID 201002414  

E-Print Network (OSTI)

ORNL 2011-G00219/jcn UT-B ID 201002414 08.2011 Catalytic Conversion of Bioethanol to Hydrocarbons dilute bio-mass produced alcohols, such as those found in a biomass fermentation reactor. Conventional of traditional ethanol fermentation into fungible fuel applications Potential Applications · Hydrocarbon products

Pennycook, Steve

183

An adaptive architecture of applying vulnerability analysis to IDS alerts  

Science Conference Proceedings (OSTI)

With increasing intrusions and attacks on the Internet, there is an urgent need to develop techniques for network security. Current standalone network security products, such as the firewall systems, the Intrusion Detection System (IDS), the anti-virus ... Keywords: alert, intrusion detection, network security, predicate-based evaluation, vulnerability analysis

Xuejiao Liu; Xin Zhuang; Debao Xiao

2008-07-01T23:59:59.000Z

184

ORNL 2010-G00390/jcn UT-B ID 200802041  

E-Print Network (OSTI)

from Water Technology Summary Developing the technology to generate energy from waste and renewableORNL 2010-G00390/jcn UT-B ID 200802041 Microbial Fuel Cells Generate Energy While Clearing Biowaste materials is becoming an increasingly important priority in the United States, as energy derived from fossil

Pennycook, Steve

185

ORNL 2011-G00218/jcn UT-B ID 200701859  

E-Print Network (OSTI)

be wasted energy inside a hybrid electric vehicle engine. The invention, a mechanical flywheel coupledORNL 2011-G00218/jcn UT-B ID 200701859 07.2011 Flywheel Energy Storage Device for Hybrid to a rotor inside the engine, stores rotational energy during engine performance, subsequently feeding

Pennycook, Steve

186

ORNL 2010-G00385/jcn UT-B ID 200301297  

E-Print Network (OSTI)

billion annually in lost productivity. Waste energy from deceleration could be captured and storedORNL 2010-G00385/jcn UT-B ID 200301297 Nanostructured Carbon Shows Promise for Energy Storage energy storage demands of modern supercapacitors. Short power interruptions cost U.S. industry $80

Pennycook, Steve

187

ORNL 2010-G00405 UT-B ID 200902330  

E-Print Network (OSTI)

Industrial Effluents Technology Summary A vast amount of energy is wasted in the United States from of such previously wasted energy from relatively low temperature (ORNL 2010-G00405 UT-B ID 200902330 Novel Nanopore Membrane Technology Recovers Energy from

Pennycook, Steve

188

ID-based proxy signature scheme with message recovery  

Science Conference Proceedings (OSTI)

A proxy signature scheme, introduced by Mambo, Usuda and Okamoto, allows an entity to delegate its signing rights to another entity. Identity based public key cryptosystems are a good alternative for a certificate based public key setting, especially ... Keywords: Bilinear pairing, ID-based signature, Mobile agent, Proxy signature, Signature with message recovery

Harendra Singh; Girraj Kumar Verma

2012-01-01T23:59:59.000Z

189

UW China Hong Kong Entrance Scholarship University of Waterloo ID#  

E-Print Network (OSTI)

UW ­ China Hong Kong Entrance Scholarship Name: University of Waterloo ID#: Program Applied of Waterloo who currently lives in or who previously lived in Hong Kong or mainland China. Candidates must also intend to return to Hong Kong or China after graduation. Selection will be based on academic

Le Roy, Robert J.

190

K-Ar dating of young volcanic rocks  

DOE Green Energy (OSTI)

Potassium-Argon (K-Ar) age dates were determined for forty-two young geologic samples by the Laboratory of Isotope Geochemistry, Department of Geosciences, in the period February 1, 1986 to June 30, 1989. Under the terms of Department of Energy Grant No. FG07-86ID12622, The University of Arizona was to provide state-of-the-art K-Ar age dating services, including sample preparation, analytical procedures, and computations, for forty-two young geologic samples submitted by DOE geothermal researchers. We billed only for forty samples. Age dates were determined for geologic samples from five regions with geothermal potential: the Cascade Mountains (Oregon); the Cascade Mountains (Washington); Ascension Island, South Atlantic Ocean; Cerro Prieto, Mexico; and Las Azufres, Mexico. The ages determined varied from 5.92 m.a. to 0.62 m.a. The integration of K-Ar dates with geologic data and the interpretation in terms of geologic and geothermal significance has been reported separately by the various DOE geothermal researchers. Table 1 presents a detailed listing of all samples dated, general sample location, researcher, researcher's organization, rock type, age, and probable error (1 standard deviation). Additional details regarding the geologic samples may be obtained from the respective geothermal researcher. 1 tab.

Damon, P.E.; Shafiqullah, M.

1991-01-31T23:59:59.000Z

191

Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite)  

U.S. Energy Information Administration (EIA) Indexed Site

Report Period: Report Period: EIA ID NUMBER: Instructions: (e.g., Street Address, Bldg, Floor, Suite) Secure File Transfer option available at: (e.g., PO Box, RR) Electronic Transmission: The PC Electronic Data Reporting Option (PEDRO) is available. Zip Code: - If interested in software, call (202) 586-9659. Email form to: Fax form to: (202) 586-9772 - - Mail form to: Oil & Gas Survey - - U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 OOG.SURVEYS@eia.doe.gov Contact Name: Version No.: 2013.01 Date of this Report: Mo Day State: Year Phone No.: DOMESTIC CRUDE OIL FIRST PURCHASE REPORT Company Name: A completed form must be filed by the 30th calendar day following the end of the report

192

DOE-ID FOIA Type A Accident Investigation Board Report - July 28, 1998  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Reading Room Documents Electronic Reading Room Documents Freedom of Information Act (FOIA) More on FOIA/Privacy Act Electronic Request Form Frequently Ask Questions Frequently Requested Documents Guides Helpful Links Points of Contact and Privacy Act Advisory Privacy Act Reading Room DOE-ID Public Reading Room Research Library You are here: DOE-ID Home > FOIA > Type A Accident Investigation Board Report - July 28, 1998 Type A Accident Investigation Board Report - July 28, 1998 Fatality and Multiple Injuries Resulting From Release of Carbon Dioxide at Building 648, Test Reactor Area Idaho National Engineering and Environmental Laboratory Files are provided in Adobe Acrobat format. If you experience problems reading these files please download the latest Adobe Acrobat reader at http://get.adobe.com/reader/ Download Acrobat Reader . Adobe Acrobat file Reader will allow you to view, navigate, and print these PDF files on all major computing platforms.

193

0072.htm. Accessed [date].  

E-Print Network (OSTI)

Vermont is developing a health care system that could offer a unique opportunity to test a new model for improving population health. Four lines of development converged for the system: 1) a published challenge to create a pay-for-population health system, 2) comprehensive state health reform legislation, 3) the Institute for Healthcare Improvement Triple Aim project, and 4) the concept of the accountable care organization (ACO). In phase 1 of pilot testing, 3 communities serving 10 % of the population are using the system, which is based on the enhanced medical home model. Planning is under way for phase 2 of the pilot, ACOs that use incentives based on the Triple Aim goals. Vermont has created a conceptual framework for a community health system and identified some of the practical issues involved in implementing this framework. This article summarizes the design and implementation of the enhanced medical home pilots and the results of a feasibility study for the ACO pilots. It describes how one state is using a systematic approach to health care reform to overcome some of the implementation barriers to a pay-for-population health system. Vermont will continue to provide a statewide laboratory for a pay-for-population health system.

James Hester Phd; Peer Reviewed

2010-01-01T23:59:59.000Z

194

AUTHORS DATE PP  

E-Print Network (OSTI)

The aerospace industry is showing a growing interest to apply acoustic treatment in the exhaust ducts of turbofan engines to attenuate combustion and turbine noise. The design, optimisation and testing of hot stream liners require improved theoretical models and facilities to validate and evaluate the acoustic performances of these liners under realistic engine operating conditions. To extend the capabilities for liner testing, NLR has modified an existing burner rig. The main objective was to build a facility for hot stream liner testing up to a flow Mach number of 0.4 and a maximum temperature of 500 C, which has been met. Both insertion loss and in-situ acoustic impedance measurements can be performed at maximum sound pressure levels of about 145 dB. An overview is given of the design and commissioning of the new facility, the instrumentation and the measurement techniques. Furthermore a selection of results are presented on measured insertion losses and acoustic impedances. Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR-TP-2003-202

R. J. Nijboer; S. L. Sarin

2003-01-01T23:59:59.000Z

195

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-C 2-C NEPA ID No.: PXP-10-0004 Deactivation & Decommissioning of the North Compost Tent Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Environmental Restoration's (ER) North Compost Tent, which was damaged by a storm in 2003 and has not been fully operational since then. It is considered unsalvageable by the Facility & Systems Design Department. Demolition will consist of: Removal of clay soil (approximately 1 foot deep) and two liners (polyvinylchloride and

196

Property:Achievement Date | Open Energy Information  

Open Energy Info (EERE)

Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&oldid...

197

Microsoft Word - DOE-ID-INL-12-018.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner. Approximate cost associated with the activity is estimated at $1,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Transacting real property in Rexburg, Idaho and moving four buses to a lot in Rigby, Idaho will not affect any INL environmental

198

Microsoft Word - DOE-ID-INL-12-021.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-12-021 DOE-ID-INL-12-021 SECTION A. Project Title: High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility (WRRTF) SECTION B. Project Description: The scope of this project is to construct and operate a 150-watt high frequency (HF) radio antenna (both transmit and receive) within the fenced area of the former Water Reactor Research Test Facility (WRRTF) to support various wireless test bed (WTB) activities and increase WTB capabilities by measuring the ionospheric characteristics of the region. The measurements are used to generate propagation maps of the ionosphere to graphically illustrate what HF frequencies are effective for communications. Construction is scheduled to take place in the August-September 2012 timeframe with operation beginning in October 2012.

199

Microsoft Word - DOE-ID-INL-12-012.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

ECX Posting No.: DOE-ID-INL-12-012 ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately 40 gallons per hour of rinse water effluent. Developer and fixer effluents from the current film processing equipment are being collected in a Satellite Accumulation Area (SAA). The new equipment would eliminate the need for storing the effluent in the SAA by filtering silver from the effluent for recycling. The remaining

200

Microsoft Word - DOE-ID-INL-10-020.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID-INL-10-020 DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial service activities required to support safe and efficient plant operation, even if performed on an infrequent basis, and would occur on the INL Site and at those in town (Idaho Falls) facilities. These activities would be performed by INL Facility and Site Services personnel or off-site contractors. None of these activities would

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Microsoft Word - DOE-ID-INL-13-007.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data will be collected at seismic stations located near INL facility areas for at least two years using seismometers and for the long-term using accelerometers. Installation of the seismic stations is being funded by the INL PSHA - Data Collection and Evaluation project and, following completion of this project,

202

Microsoft Word - DOE-ID-INL-10-017.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-10-017 DOE-ID-INL-10-017 SECTION A. Project Title: ATR Complex Dial Room. SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Advanced Test Reactor Complex (ATR Complex) (formerly known as the Test Reactor Area [TRA]) in order to meet the U.S. Department of Energy Office of Nuclear Energy programmatic needs and to provide ongoing critical support at the Idaho National Laboratory (INL). The existing telecommunication and data systems located at the ATR Complex need to be updated to ensure the protection and continuity of telecommunications hardware and software property and provide reliability of communications and data connectivity. The new modular dial room facility will replace existing telecommunications systems equipment (telephony, optical transport, and data network infrastructure

203

Microsoft Word - DOE-ID-INL-12-021.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID-INL-12-021 DOE-ID-INL-12-021 SECTION A. Project Title: High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility (WRRTF) SECTION B. Project Description: The scope of this project is to construct and operate a 150-watt high frequency (HF) radio antenna (both transmit and receive) within the fenced area of the former Water Reactor Research Test Facility (WRRTF) to support various wireless test bed (WTB) activities and increase WTB capabilities by measuring the ionospheric characteristics of the region. The measurements are used to generate propagation maps of the ionosphere to graphically illustrate what HF frequencies are effective for communications. Construction is scheduled to take place in the August-September 2012 timeframe with operation beginning in October 2012.

204

Microsoft Word - DOE-ID-INL-13-007.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 EC Document No.: DOE-ID-INL-13-007 SECTION A. Project Title: Seismic Monitoring for Seismic Hazards Analyses SECTION B. Project Description: The Idaho National Laboratory (INL) Probabilistic Seismic Hazards Analysis (PSHA) Phase I - Data Collection and Evaluation project is being conducted by Battelle Energy Alliance (BEA) at the request of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. The project is being conducted from FY-2013 to FY-2017. Earthquake data will be collected at seismic stations located near INL facility areas for at least two years using seismometers and for the long-term using accelerometers. Installation of the seismic stations is being funded by the INL PSHA - Data Collection and Evaluation project and, following completion of this project,

205

DOE-ID Procurement Services � the action team  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID Procurement Services � the action team DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s Procurement Services team. Rapid response Pat Alexander-Johnson (top) and Jeff Fogg (bottom) are two highly-trained and experienced contract specialists with the U.S. Department of Energy's Idaho Operations Office. Within moments of receiving its orders, the 10-member team shifted into

206

Microsoft Word - DOE-ID-INL-12-024..doc  

NLE Websites -- All DOE Office Websites (Extended Search)

PostingNo.: DOE-ID-INL-12-024 PostingNo.: DOE-ID-INL-12-024 SECTION A. Project Title: Rigby Bus Lot Northwest Entrance SECTION B. Project Description: The purpose of the proposed action is to provide an additional bus entrance to the Rigby Park and Ride Bus Lot. A portion of chain link fencing (running east to west) on the northwest corner of the Rigby Park and Ride Bus Lot would be relocated to allow an opening off of the City of Rigby dirt access road so that buses may enter the Rigby Park and Ride Lot from the northwest. The existing fence material would then be placed across the City of Rigby dirt access road (running north and south). The new entrance would be for buses only. Approximately 4 to 6 buses would use this entrance. No personnel vehicles will have access. Buses would start using the new

207

Microsoft Word - DOE-ID-INL-12-012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ECX Posting No.: DOE-ID-INL-12-012 ECX Posting No.: DOE-ID-INL-12-012 SECTION A. Project Title: Film Processing Project at Test Reactor Area (TRA)-678 SECTION B. Project Description The proposed action is to install a silver recovery unit to the film processor in the film processing area at TRA-678 for the purpose of minimizing waste generation and implementing pollution prevention. The proposed film processor (Kodak M-35A) generates approximately 90 ml of developer and 140 ml of fixer effluents per 17 inch film and approximately 40 gallons per hour of rinse water effluent. Developer and fixer effluents from the current film processing equipment are being collected in a Satellite Accumulation Area (SAA). The new equipment would eliminate the need for storing the effluent in the SAA by filtering silver from the effluent for recycling. The remaining

208

Microsoft Word - DOE-ID-INL-12-018.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 SECTION A. Project Title: Rexburg Bus Lot (B60-1789-D-NE) Lease Termination SECTION B. Project Description: The proposed activity will terminate the lease of approximately four bus spaces at the Rexburg Parking Lot (B60-1789-D-NE) at South 5 th West in Rexburg, ID on or about July 31, 2012 for cost savings and consolidation to the existing lot at Rigby, ID. A facility walkthrough by BEA personnel will be performed in order to ensure the facility is ready for turnover back to the owner. Approximate cost associated with the activity is estimated at $1,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Transacting real property in Rexburg, Idaho and moving four buses to a lot in Rigby, Idaho will not affect any INL environmental

209

Microsoft Word - DOE-ID-INL-10-020.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-ID-INL-10-020 DOE-ID-INL-10-020 SECTION A. Project Title: Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching) SECTION B. Project Description: The purpose of this overarching Environmental Checklist (EC) is to address activities that would meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. These activities would consist of typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial service activities required to support safe and efficient plant operation, even if performed on an infrequent basis, and would occur on the INL Site and at those in town (Idaho Falls) facilities. These activities would be performed by INL Facility and Site Services personnel or off-site contractors. None of these activities would

210

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

211

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

212

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

213

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

214

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

215

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

216

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and...

217

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

covers competitions. Word versions of the four templates will be available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

218

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

219

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the fourteen aforementioned RFP Section L and M templates are available in STRIPES as part of the series of DOE-L-1024 or DOE-M-1005 clauses. This Flash will be...

220

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the three aforementioned RFP Section H and L templates are available in STRIPES. This Flash will be available online within a day, at the following website: http:...

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Dates:  

NLE Websites -- All DOE Office Websites (Extended Search)

of the determinants of fire behavior though studying inputs (weather, slope, fuels, and fuel moisture); learn how to interpret fire behavior outputs; documentation processes; &...

222

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

223

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

224

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

225

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

226

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

227

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

228

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

229

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

230

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

231

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

232

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

233

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

234

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

235

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

236

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

237

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

238

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

239

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

240

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

242

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

existing technologies to advance weld quality monitoring and closed loop feedback for welding systems and techniques typically used in the nuclear industry. 9. Stress Corrosion...

243

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed without further CRM office involvement. Generating and Managing Waste - Industrial waste in the form of general construction debris such as waste concrete, scrap...

244

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

owners rely on and hold contracts with Western for access to affordable and reliable bulk power supply from the Pick Sloan hydro electric system and transmission service from the...

245

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase...

246

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render...

247

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Managing Waste: Wooden material wastes would be generated from dimension lumber, plywood and particle board. No regulated wastes (e.g. chemicals, asbestos) are anticipated to...

248

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background Purpose &...

249

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CERCLA Disposal Facility or at an approved off-Site facility through Waste Generator Services. 19. Work within areas Subject to Flooding - Since the well abandonment work is...

250

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPA filters. These materials will be packaged and disposed of through Waste Generation Services. 19. Work in Areas Subject to Flooding - The activities discussed are planned to...

251

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B....

252

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial...

253

Date  

E-Print Network (OSTI)

This Design Manual Chapter 1620 Supplement is to revise WSDOT policy relating to the selection of impact attenuator systems. If you maintain a printed manual, please remove the current Chapter 1620 and replace it with the August 2011 Supplement. To get the latest information on WSDOT administrative and engineering manuals, sign up for

unknown authors

2011-01-01T23:59:59.000Z

254

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will pack, move, setup, and test the NGWTB electronic equipment. In addition, the propane tank located at CFA-666 will be relocated to CFA-661. Three propane heaters and...

255

Date  

E-Print Network (OSTI)

This thesis has been reviewed by the research advisor, research coordinator, and department chair and has been found to be satisfactory.

Clark David; Wilson Blockburger

2006-01-01T23:59:59.000Z

256

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

257

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

258

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

259

104th Dates to Remember  

Science Conference Proceedings (OSTI)

Questions? Contact Connie Hilson, AOCS Exhibits Specialist, by email: connieh@aocs.org or by phone: +1 217-639-4831. Dates to Remember * January 7, 201/span>3 Online registration opens January 15, 201/span>3 Exhibitor presentations: Deadl

260

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

File:03-ID-d - Land Use Permit.pdf | Open Energy Information  

Open Energy Info (EERE)

d - Land Use Permit.pdf d - Land Use Permit.pdf Jump to: navigation, search File File history File usage Metadata File:03-ID-d - Land Use Permit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 28 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:56, 22 August 2013 Thumbnail for version as of 13:56, 22 August 2013 1,275 × 1,650 (28 KB) Abergfel (Talk | contribs) 13:47, 22 August 2013 Thumbnail for version as of 13:47, 22 August 2013 1,275 × 1,650 (27 KB) Abergfel (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

262

RENEWABLE ENERGY FROM SWINE WASTE Bingjun He, University of Idaho, Moscow, ID 1  

E-Print Network (OSTI)

RENEWABLE ENERGY FROM SWINE WASTE Bingjun He, University of Idaho, Moscow, ID 1 Yuanhui Zhang, Ted of Idaho, Moscow, ID 83844. Phone: 208.885.7714, fax: 208.885.7908, email: . 2Yuanhui Zhang

He, Brian

263

GRR/Section 13-ID-a - Land Use Assessment | Open Energy Information  

Open Energy Info (EERE)

ID-a - Land Use Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 13-ID-a - Land Use...

264

Microsoft Word - DOE-ID-INL-13-002 _INL-13-008_.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: DOE-ID-INL-13-002 If objects of potential archaeological or historical significance (e.g.,...

265

Microsoft Word - DOE-ID-INL-12-025-1.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

would be recycled to the extent practicable. DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: DOE-ID-INL-12-025 SECTION D. Determine the...

266

Microsoft Word - DOE-ID-INL-12-007_INL-12-033_.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

personal protective equipment (PPE) where practical. DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL LABORATORY Page 2 of 2 CX Posting No.: DOE-ID-INL-12-007 Releasing...

267

U-063: RSA SecurID Software Token for Windows DLL Loading Error...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote...

268

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-C 09-C NEPA ID No.: PXP-11-0006 Environmental Restoration & Waste Mgt. Activities, FY 2012-2013 Application of DOE NEPA Procedure: The Categorical Exclusions B6.1 and B6.2, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), apply to project number ESH-11-009-C. Rationale: The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), Pantex Site Office, proposes Environmental Restoration & Waste Management Activities for Fiscal Years 2012 and 2013 under project number ESH-11-009-C. These activities could include: Remedial actions, including design, construction, and operation of corrective measures (e.g., landfill covers and soil remediation activities);  Accelerated soil cleanups;

269

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-C 3-C NEPA ID No.: PXP-10-0007 Demolition of Buildings 11-10 and 11-30 Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Buildings 11-10 and 11-30 at the Pantex Plant. The overall objectives are to reduce Plant maintenance costs and reduce the Pantex Plant footprint by 3,144 square feet. Building 11-10 is approximately 929 square feet, single story, slab on grade, brick structure with a shingle roof. The interior of the building consists of only two rooms separated by a masonry wall. An asbestos

270

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D&D-10-001-C D&D-10-001-C NEPA ID No. PXP-10-0001 Amendment No. 10-010 Decontamination & Demolition of Residential and Farm Structures Application of DOE NEPA Procedure: Categorical Exclusions B1.23 and B6.1(c), Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), apply to the proposed activities. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activities described in Amendment No. 10-010 of NEPA Review Form (NRF) PXP-10-0001. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), recently acquired 1,526 acres of land to allow access for environmental monitoring and implementation of institutional controls. This property contains two homesteads - the former

271

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-C 2-C NEPA ID No.: PXP-11-0004 Operations Systems Development & Integration Application of DOE NEPA Procedure: The Categorical Exclusion B4.6, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to project number LIN- 11-002-C. Rationale: The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), Pantex Site Office, proposed an Operations Systems Development and Integration (OSD&I) project in Fiscal Year 2010, under project number LIN-10-001-C, to replace the existing functionality being performed by MRP-II/CAS. The project would enhance manufacturing operations utilizing modern software solutions. The project also would provide a technology refresh with added capability. NEPA Review Form PXP-10-0005 determined that

272

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-C 4-C NEPA ID No.: PXP-10-0008 Demolition of Building 12-2B Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Building 12-2B and reduce the Pantex Plant footprint by 3,181 square feet. Project tasks include preparing and approving Planning Documents, removing building furnishings and contents, cutting, capping, and rerouting utilities associated with the structure, razing the structure, reworking/closing masonry wall at door opening, recycling uncontaminated concrete and metal, disposing of waste, and backfilling and restoring the area

273

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-C 1-C NEPA ID No.: PXP-11-0002 HPFL Tank & Pump Replacement Application of DOE NEPA Procedure: Categorical Exclusion B1.15, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to this proposal. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activity described in NEPA Review Form (NRF) PXP-11-0002, which is hereby incorporated by reference. Rationale: The U.S. Department of Energy, National Nuclear Security Administration, proposes to construct and operate two new high pressure fire loop (HPFL) pump houses and tank facilities at the B&W Pantex Facility to replace aging existing facilities. Construction and staging areas would require approximately one acre of land disturbance for each facility.

274

Dating deception: Gender, online dating, and exaggerated self-presentation  

Science Conference Proceedings (OSTI)

This study examined how differences in expectations about meeting impacted the degree of deceptive self-presentation individuals displayed within the context of dating. Participants filled out personality measures in one of four anticipated meeting conditions: ... Keywords: Gender differences, Internet, Mate selection, Personality, Self-presentation

Rosanna E. Guadagno; Bradley M. Okdie; Sara A. Kruse

2012-03-01T23:59:59.000Z

275

Result Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Search DNA Search RNA Advanced Search Submit Search for released structures ID: Your Query Found No Structures in the NDB....

276

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

277

Date Date Date Date Date  

E-Print Network (OSTI)

This thesis investigates the problem of regulating the temperature of a conditioned space using a Solar Assisted Air Conditioning Systems (SAACS) prototype located at Cabo Rojo, Puerto Rico. The SAACS Prototype consists of a 66 flat plate solar collector array with 115.4 m 2 of selective surface area, a 35 kW single-effect lithium-bromide absorption chiller, a 84 kW cooling tower, a 50 kW auxiliary hot water boiler, a 5700 liter storage tank equipped with flexible stratification manifolds, and a 1800 l/hr air-handling unit. A discrete-time state-space model of the absorption chiller and a linear model of the plant to be controlled (the conditioned space) are identified and presented. Experimental data was used for the determination of these models. A temperature controller was designed and applied to the plant model. This controller operates the absorption chiller under multiple load conditions and regulates the flow in the chilled water line based on the conditioned space requirements. The designed controller was implemented in the SAACS prototype. The systems

Carlos A. Gonzlez Lozano; Miguel Vlez Reyes, Ph.D.; Gerson Beauchamp Bez, Ph.D., Ph.D.

2004-01-01T23:59:59.000Z

278

Data Administration Area: Date Issued  

E-Print Network (OSTI)

Policy Data Administration Policy Area: Date Issued: April, 1994 Title: Data Administration Last. INTRODUCTION The President established the Committee on Data Administration (CODA) in May, 1992, to advise him on policies in the area of data administration (attached as references Policy ADC 011 and TOR for CODA

Brownstone, Rob

279

Effective Date: MEMORANDUM OF UNDERSTANDING  

E-Print Network (OSTI)

complementary goals in aviation and future space transportation, to coordinate planning efforts, and to haveEffective Date: MEMORANDUM OF UNDERSTANDING Between DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION IN AVIATION AND SPACE TRANSPORTATION I. PURPOSE The Department of TransportatiodFederal Aviation

280

UNDERGRADUATE HANDBOOK 2011 Final Dates  

E-Print Network (OSTI)

............................................................................................................... Friday 23 September Last day for receipt of applications to enrol for 2012 through UAC without financial to be confirmed. Semester & session dates for 2012 First Semester Information Systems Head of School and Professor of Accounting FARGHER, Professor Neil L., BCom Melb MBus RMIT

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Alternative Muon Front-end for the International Design Study (IDS)  

E-Print Network (OSTI)

We discuss alternative designs of the muon capture front end of the Neutrino Factory International Design Study (IDS). In the front end, a proton bunch on a target creates secondary pions that drift into a capture channel, decaying into muons. A sequence of RF cavities forms the resulting muon beams into strings of bunches of differing energies, aligns the bunches to (nearly) equal central energies, and initiates ionization cooling. This design is affected by limitations on accelerating gradients within magnetic fields. The effects of gradient limitations are explored, and mitigation strategies are presented

Alekou, A; Martini, M; Prior, G; Rogers, C; Stratakis, D; Yoshikawa, C; Zisman, M

2010-01-01T23:59:59.000Z

282

Customer Name: (First name, middle initial, last name) Social Security Number or Federal ID Number TAMU Customer Number (if assigned) Customer Information: Persons authorized to make purchases on this account  

E-Print Network (OSTI)

Customer Name: (First name, middle initial, last name) Social Security Number or Federal ID Number TAMU Customer Number (if assigned) Customer Information: Persons authorized to make purchases: Email Address: Phone: Fax: Phone: Fax: Name: Title: Customer Representative Signature: Date: This form

Meagher, Mary

283

Institute of Development Studies (IDS) | Open Energy Information  

Open Energy Info (EERE)

Institute of Development Studies (IDS) Institute of Development Studies (IDS) Jump to: navigation, search Logo: Institute of Development Studies Name Institute of Development Studies Address Library Road, Brighton, East Sussex Place Brighton, UK Zip BN1 9RE Number of employees 201-500 Year founded 1966 Phone number +44 (0)1273 606261 Coordinates 50.8659583°, -0.0901136° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8659583,"lon":-0.0901136,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

284

U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RSA SecurID Software Token for Windows DLL Loading Error 3: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code December 16, 2011 - 8:00am Addthis PROBLEM: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code. PLATFORM: RSA SecurID Software Token 4.1 for Microsoft Windows ABSTRACT: A remote user can cause the target application to execute arbitrary code on the target user's system. reference LINKS: SecurityTracker Alert ID: 1026426 ESA-2011-039 Secunia Advisory: SA45665 Securityfocus Advisory CVE-2011-4141 RSA Online Fraud Resource Center IMPACT ASSESSMENT: High Discussion: A vulnerability was reported in RSA SecurID Software Token. A remote user

285

U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

63: RSA SecurID Software Token for Windows DLL Loading Error 63: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code U-063: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code December 16, 2011 - 8:00am Addthis PROBLEM: RSA SecurID Software Token for Windows DLL Loading Error Lets Remote Users Execute Arbitrary Code. PLATFORM: RSA SecurID Software Token 4.1 for Microsoft Windows ABSTRACT: A remote user can cause the target application to execute arbitrary code on the target user's system. reference LINKS: SecurityTracker Alert ID: 1026426 ESA-2011-039 Secunia Advisory: SA45665 Securityfocus Advisory CVE-2011-4141 RSA Online Fraud Resource Center IMPACT ASSESSMENT: High Discussion: A vulnerability was reported in RSA SecurID Software Token. A remote user

286

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

287

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

288

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determinations By Date September 24, 2012 CX-009335: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 0924...

289

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By Date April 11, 2011 CX-005702: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Schmitz, Mary C. Date: 04112011 Location(s): Minnesota...

290

Review of Test Results  

NLE Websites -- All DOE Office Websites (Extended Search)

GAC004 Revision 1 Effective June 2008 Review of Test Results Prepared by Electric Transportation Applications Prepared by: Date: Garrett...

291

Microsoft Word - DOE-ID-INL-12-022.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate, ship materials off-site, observe, and conduct training for response to radiological incidents at the Idaho National Laboratory (INL) locations and non-INL customer-hosted locations (such as Armed Forces installations). Only work performed at the INL is covered under this EC. Training at non-INL customer-hosted locations may be subject

292

Microsoft Word - DOE-ID-INL-13-008.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEID NEPA CX DETERMINATION DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap from the existing slope around the culvert area. 2) Installing a concrete headwall structure around the culvert inlet. 3) Increase the slope of the dam at the culvert inlet and around the headwall to a 3:1 slope. 4) Replace riprap around headwall.

293

Microsoft Word - DOE-ID-INL-13-008.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOEID NEPA CX DETERMINATION DOEID NEPA CX DETERMINATION Idaho National Laboratory Page 1 of 2 EC Document No.: DOE-ID-INL-13-008 SECTION A. Project Title: Materials and Fuels Complex (MFC) Diversion Dam SECTION B. Project Description: There is a flood control dam about 2000 ft south of MFC. The dam is at risk of failure during a large runoff event. This project will reinforce the flood control dam with additional earthen material and a concrete headwall around the culvert inlet. The workscope consists of 1) Removing riprap from the existing slope around the culvert area. 2) Installing a concrete headwall structure around the culvert inlet. 3) Increase the slope of the dam at the culvert inlet and around the headwall to a 3:1 slope. 4) Replace riprap around headwall.

294

Microsoft Word - DOE-ID_INL-13-010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: North Boulevard Annex Lease Termination SECTION B. Project Description: The proposed activity would terminate the current lease of the North Boulevard Annex (IF-613) at 2095 North Boulevard in Idaho Falls, ID on or about July 31, 2013 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur prior to the lease termination to ensure the facility is ready for turnover back to the owner. Approximate cost associated with these activities is estimated at $2,000.00. SECTION C. Environmental Aspects or Potential Sources of Impact: Generating and Managing Waste: Various quantities of industrial waste (non-hazardous, non-radioactive) such as office trash are removed from the building for pickup and transportation by garbage collection services prior to lease termination.

295

Microsoft Word - DOE-ID-INL-13-019.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 SECTION A. Project Title: University Boulevard Water Meter Installation SECTION B. Project Description: This project would install water meters for the purpose of measuring water use at each of four University Boulevard (UB) buildings at 535, 655, 625, and 595 University Boulevard (IF-680 (UB1), IF-681 (UB2), IF-682 (UB3), and IF-684 (UB4)) in Idaho Falls, ID during the projected time period of August and September, 2013 at an approximate cost of $20 K - $95 K depending upon whether the work can be completed from inside the building(s) or must be performed exterior to the building(s). SECTION C. Environmental Aspects or Potential Sources of Impact: Air Emissions: If excavation is required, the activity has the potential to generate fugitive dust. All reasonable precautions shall be

296

Microsoft Word - DOE-ID-INL-13-012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 CX Posting No.: DOE-ID-INL-13-012 SECTION A. Project Title: Water Security Test Bed (WSTB) SECTION B. Project Description: This project was extensively described in Environmental Checklists (ECs) Idaho National Laboratory (INL)-13-014 (Overarching [OA] 5) and INL-13-014 Revision (R) 1 (OA 5). Upon review, it was determined that additional planning and detail was required to fully describe the project and associated activities. Both INL-13-014 and R1 to that EC are canceled; this EC will replace them. Future revisions may address additional project details regarding design, construction, and operational details and limitations as they become known through the project planning process. Background Since its inception, the Environmental Protection Agency's (EPA) Homeland Security Research Program (Sponsor) has been providing

297

Microsoft Word - DOE-ID-INL-13-006.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 EC Document No.: DOE-ID-INL-13-006 SECTION A. Project Title: Power Line Configuration 2013-1 SECTION B. Project Description: This project will install temporary distribution-level power lines between Materials and Fuels Complex (MFC) and Critical Infrastructure Test Range Complex (CITRC) to support research and development and testing using electric power infrastructure. Two circuits of three-phase distribution lines will be installed from Power Burst Facility (PBF)-613 to the MFC test pad. Standard new crossarms and insulators will be installed on the existing 138kV H structures (underbuild) to support standard aluminum conductors steel reinforced (ACSR) conductors for the majority of the configuration change (approximately from Pole 40E to Pole 127E - an

298

Microsoft Word - DOE-ID-INL-12-022.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

IDAHO NATIONAL LABORATORY Page 1 of 3 CX Posting No.: DOE-ID-INL-12-022 SECTION A. Project Title: Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching SECTION B. Project Description This Environmental Checklist (EC) will be an overarching EC for future training as described in this EC. Work Description The purpose of this overarching EC is to plan, prepare, coordinate, ship materials off-site, observe, and conduct training for response to radiological incidents at the Idaho National Laboratory (INL) locations and non-INL customer-hosted locations (such as Armed Forces installations). Only work performed at the INL is covered under this EC. Training at non-INL customer-hosted locations may be subject

299

IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

NLE Websites -- All DOE Office Websites (Extended Search)

6/2004 13:39 FAX 6/2004 13:39 FAX IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MAR 26 2004 OFFICE OF AIR AND RADIATION R. Paul Detwiler, Acting Manager Carlsbad Field Office U.S. Department of Energy P.O. Box 3090 Carlsbad, NM 88221-3090 Dear Dr. Detwiler: This letter announces the U.S. Environmental Protection Agency's (EPA's) final decision to approve the Department of Energy's (DOE's) remote handled (RH) transuranic (TRU) Waste Characterization Program Implementation Plan (WCPIP), Revision aD, and the RH TRU Waste Characterization Plan for the Waste Isolation Pilot Plant (WIPP). We have detenDined that these documents provide an adeql.late general framework for the characterization ofRH waste for disposal at WIPP, while allowing flexibility for DOE to develop characterization programs

300

Microsoft Word - DOE-ID-INL-13-022.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho National Laboratory Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-13-022 SECTION A. Project Title: Global Threat Reduction Initiative (GTRI) Irradiated Experiment Shipping Capability SECTION B. Project Description: The General Electric (GE) 2000 Model Cask is currently used to support the Global Threat Reduction Initiative (GTRI) irradiated experiment shipments from the Advanced Test Reactor (ATR) at Idaho National Laboratory's (INL) ATR Complex to the Hot Fuel Examination Facility (HFEF) at INL's Materials and Fuels Complex (MFC). However, due to changes in GE-Hitachi's business model, the continued availability of the GE Model 2000 cask is not guaranteed. Furthermore, the internal cavity of the GE Model 2000 cask is too short to support shipment of some larger GTRI experiments. The purpose of the proposed action is to develop and implement a

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Microsoft Word - DOE-ID-INL-12-023.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Checklist Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to place private telecommunications infrastructure in the City easement. Idaho Falls Power would provide and install a 1" conduit with pull rope for future INL use. Idaho Falls Power would provide and install a fiber patch panel, pull the fiber coiled in the WCB northeast parking lot handhole, and terminate and test the fiber to provide connectivity

302

Microsoft Word - DOE-ID-INL-12-006.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: International Way Office Building Lease Termination SECTION B. Project Description: The proposed activity will terminate the current lease of the International Way Office Building (IF-674, IWB) at 1690 International Way in Idaho Falls, ID on or about March 28, 2012 for cost savings and footprint reduction purposes. A facility walkthrough by BEA personnel will occur on or about March 26 to ensure the building is ready for turnover back to the owner. Approximate cost associated with these activities is estimated at $2,500.00. SECTION C. Environmental Aspects / Potential Sources of Impact: Generating and Managing Waste: Small amounts of industrial waste (non-hazardous, non-radioactive) such as office trash are

303

Microsoft Word - DOE-ID-INL-12-023.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Checklist Environmental Checklist Page 1 of 1 CX Posting No.: DOE-ID-INL-12-023 SECTION A. Project Title: Idaho Falls Power - Willow Creek Building (WCB) Conduit Installation SECTION B. Project Description: The purpose of this project is to provide the Idaho National Laboratory (INL) a communications pathway from the Willow Creek Building (WCB) northeast parking lot handhole to the handhole north of Research and Education Campus (REC)-617. INL and the City of Idaho Falls have an existing easement agreement that allows INL to place private telecommunications infrastructure in the City easement. Idaho Falls Power would provide and install a 1" conduit with pull rope for future INL use. Idaho Falls Power would provide and install a fiber patch panel, pull the fiber coiled in the WCB northeast parking lot handhole, and terminate and test the fiber to provide connectivity

304

2014 NEJC Save the Date (Spanish)  

Energy.gov (U.S. Department of Energy (DOE))

2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014

305

U-120: RSA SecurID Software Token Converter Unspecified Buffer Overflow  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: RSA SecurID Software Token Converter Unspecified Buffer 0: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability U-120: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability March 8, 2012 - 7:00am Addthis PROBLEM: RSA SecurID Software Token Converter Unspecified Buffer Overflow Vulnerability PLATFORM: RSA SecurID Software Token Converter 2.x ABSTRACT: Successful exploitation may allow execution of arbitrary code. reference LINKS: Secunia Advisory SA48297 CVE-2012-0397 IMPACT ASSESSMENT: High Discussion: A vulnerability has been reported in RSA SecurID Software Token Converter, which can be exploited by malicious people to compromise a user's system. Impact: An unspecified error can be exploited to cause a buffer overflow. Solution: Update to version 2.6.1. Addthis Related Articles

306

Idaho National Laboratory Supervisory Control and Data Acquisition Intrusion Detection System (SCADA IDS)  

SciTech Connect

Current Intrusion Detection System (IDS) technology is not suited to be widely deployed inside a Supervisory, Control and Data Acquisition (SCADA) environment. Anomaly- and signature-based IDS technologies have developed methods to cover information technology-based networks activity and protocols effectively. However, these IDS technologies do not include the fine protocol granularity required to ensure network security inside an environment with weak protocols lacking authentication and encryption. By implementing a more specific and more intelligent packet inspection mechanism, tailored traffic flow analysis, and unique packet tampering detection, IDS technology developed specifically for SCADA environments can be deployed with confidence in detecting malicious activity.

Jared Verba; Michael Milvich

2008-05-01T23:59:59.000Z

307

A Role for Id-1 in the Aggressive Phenotype and Steroid ...  

Desprez, P. Y., Hara E., Bissell, M. J., and Campisi, J. Suppression of mammary epithelial cell differentiation by the helix-loop-helix protein Id-1. Mol. Cell.

308

AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTFWCT I 1 CONTRACT ID CODE PAGE I OF 2  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTFWCT I CONTFWCT I 1 CONTRACT ID CODE PAGE I OF 2 PAGES MI10 I See Block 16C I REQ. NO. BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, VA 24506 2. AMENDMENTIMODIFICATION NO. 1 3. EFFECTIVE DATE 1 4. REQUISITIONIPURCHASE 1 5. PROJECT NO. (If a ~ ~ l i c a b l e l . a , U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 871 85-5400 96. DATED (SEE ITEM 1 1 ) 6. ISSUED BY CODE 1 7. ADMINISTERED BY (If other than Item 6 J CODE U.S. Department of Energy National Nuclear Security Administration Manager, Pantex Site Office P.O. Box 30030 Amarillo, TX 79120 DE-AC04-00AL66620 1 1 106. DATED (SEE ITEM 1 0 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code)

309

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

310

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

311

SAT(ID): satisfiability of propositional logic extended with inductive definitions  

Science Conference Proceedings (OSTI)

We investigate the satisfiability problem, SAT(ID), of an extension of propositional logic with inductive definitions. We demonstrate how to extend existing SAT solvers to become SAT(ID) solvers, and provide an implementation on top of MiniSat. We also ...

Maarten Marin; Johan Wittocx; Marc Denecker; Maurice Bruynooghe

2008-05-01T23:59:59.000Z

312

GRR/Section 3-ID-d - Land Use Permit | Open Energy Information  

Open Energy Info (EERE)

d - Land Use Permit d - Land Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-d - Land Use Permit 03-ID-d - Land Use Permit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Triggers None specified Click "Edit With Form" above to add content 03-ID-d - Land Use Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Lands issues Land Use Permits for non-invasive exploration on a case by case basis. 3-ID-d.1 to 3-ID-d.2 - Will Non-Invasive Exploration Be Preformed on State Lands? A Land Use Permit is required to preform non-invasive exploration on state

313

Page 1 of 22 Building Num: Date  

E-Print Network (OSTI)

Check List Page 1 of 22 Building Num: Date: Compressed Gases/WeldingChecklist Title: Action stored away from flammable materials? 1910.252(a)(2)(i) #12;Check List Page 2 of 22 Building Num: Date)(D) Is the insulation material intact on welding machine rod holders? 1910.254(d)(9)(i) #12;Check List Page 3 of 22

Homes, Christopher C.

314

Microsoft Word - DOE-ID-INL-12-010.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation SECTION B. Project Description: The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment. The 5 ton cooling unit and drycooler will be installed on the roof of the IORC and in room E-6. Installation will also include running piping (propylene glycol return, condensate) and electrical. Relocation of the UPS and servers will require some new conduit, pull boxes, wiring and racks. Estimated Start Date: May, 2012

315

Microsoft Word - DOE-ID-INL-12-010.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 SECTION A. Project Title: Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation SECTION B. Project Description: The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment. The 5 ton cooling unit and drycooler will be installed on the roof of the IORC and in room E-6. Installation will also include running piping (propylene glycol return, condensate) and electrical. Relocation of the UPS and servers will require some new conduit, pull boxes, wiring and racks. Estimated Start Date: May, 2012

316

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 CX-001501: Categorical Exclusion Determination Commercial Renewable Energy Systems - FLS Meadowood Garden Solar CX(s) Applied: B5.1 Date: 04012010 Location(s):...

317

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Non-Contaminating Cryogenic Fracturing Technology CX(s) Applied: B3.6 Date: 12202011 Location(s): Colorado Offices(s):...

318

High Precision Radiometric Dating of Sedimentary Materials  

SciTech Connect

To develop field, petrographic and geochemical criteria to allow high precision U-Pb dating of sedimentary minerals within rapidly deposited sequences of carbonate and clastic rocks.

Hanson, G. N.

2006-09-19T23:59:59.000Z

319

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Portland) CX(s) Applied: A9 Date: 03012010 Location(s):...

320

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Los Angeles) CX(s) Applied: A9 Date: 03012010 Location(s):...

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL  

E-Print Network (OSTI)

Feb 2003 Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL 1) Source: Bldg: ________________________________________ Disinfection? cc YES, Autoclaved (each container tagged with `Treated Biomedical Waste') cc YES, Chemical

Sinnamon, Gordon J.

322

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 2011 CX-006930: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09282011 Location(s): Torrance, Los Angeles...

323

GRR/Section 8-ID-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

8-ID-a - State Transmission 8-ID-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-ID-a - State Transmission 08IDAStateTransmission.pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies IC §67-6508: Local Land Use Planning Duties IC §61-526: Certificate of Public Convenience and Necessity Triggers None specified Click "Edit With Form" above to add content 08IDAStateTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-ID-a.1 - Will the Transmission Project Be Undertaken by a Public Utility?

324

GRR/Section 6-ID-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-ID-b - Construction Storm Water Permit 6-ID-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-b - Construction Storm Water Permit 06IDBConstructionStormwaterPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 06IDBConstructionStormwaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 6-ID-b.1 - EPA Construction General Permit Idaho does not have authority from the United States Environmental Protection Agency to issue a construction storm water permit. See Flowchart

325

GRR/Section 1-ID-a - Land Use Considerations | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 1-ID-a - Land Use Considerations GRR/Section 1-ID-a - Land Use Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 1-ID-a - Land Use Considerations 01IDALandUseConsiderations.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 01IDALandUseConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Add Text Print PDF Retrieved from "http://en.openei.org/w/index.php?title=GRR/Section_1-ID-a_-_Land_Use_Considerations&oldid=685536" Categories: Regulatory Roadmap State Sections Geothermal Regulatory Roadmap Sections

326

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

on Docket ID: DOE-HQ-2011-0014 on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

327

GRR/Section 4-ID-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

4-ID-a - State Exploration Process 4-ID-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-ID-a - State Exploration Process 04IDAStateExplorationProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Triggers None specified Click "Edit With Form" above to add content 04IDAStateExplorationProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 4-ID-a.1 - Has the Environmental Process been Completed for Exploration? If an EA/EIS has not yet been completed for this portion of the project, the developer must first complete the applicable environmental process.

328

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

329

Microsoft Word - 2013 (05-22-13) DOE-ID Operations Summary-13...  

NLE Websites -- All DOE Office Websites (Extended Search)

was restored to the E-3 diesel bus from commercial power, and equipment lost due to the power outage was restored. NE-ID--BEA-ATR-2013-0012 3 April 17: (Notification) As a...

330

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of InitiatorEGO signed NRSF to DOE NCO for information only. DOE NCO Page 1 of2 RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM (continued) DOECX-00126, Rev 0 V....

331

RL-721 REV4 Document ID Number: NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9405630, HCRC2003-200-044, & DOERL-97-56 R1 Additional Attachments: Page 1 of 2 RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM (continued) DOECX-00094 Rev 0 IV....

332

(SE-33)Intelligent ID-Based threshold system by an encryption and decryption from bilinear pairing  

Science Conference Proceedings (OSTI)

We suggest a new intelligent ID-based threshold secure system by an encryption and decryption protocol using (k, n)-threshold scheme which only k agents or more are engaged to reconstruct an encrypted data for a mobile intelligent ...

Young Whan Lee; Byung Mun Choi

2005-09-01T23:59:59.000Z

333

Microsoft Word - 2013 (05-22-13) DOE-ID Operations Summary-13...  

NLE Websites -- All DOE Office Websites (Extended Search)

May 16, 2013 DOE-ID Operations Summary For the Period April 1 to May 16, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory,...

334

GRR/Section 14-ID-d - Section 401 Water Quality Certification...  

Open Energy Info (EERE)

GRRSection 14-ID-d - Section 401 Water Quality Certification Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of...

335

International Degree (ID) and Engineering For complete information and admission requirements for the ID, refer to the "Passport to the International  

E-Print Network (OSTI)

credits which apply toward the degree. The ID program advisor works closely with each student to help develop a unique program that meets their needs and future goals. Students will also work with a thesis a structural engineer on the Hanford vitrification design-build project How can I get started

Escher, Christine

336

Using neighbors to date web documents  

Science Conference Proceedings (OSTI)

Time has been successfully used as a feature in web information retrieval tasks. In this context, estimating a document's inception date or last update date is a necessary task. Classic approaches have used HTTP header fields to estimate a document's ... Keywords: link analysis, web dynamics, web information retrieval

Srgio Nunes; Cristina Ribeiro; Gabriel David

2007-11-01T23:59:59.000Z

337

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

338

Issued by: Approved by: Environmental Health and Safety Radiation Protection Committee Date issued: Date approved: Date revised: Date revision approved:  

E-Print Network (OSTI)

contamination for most radioactive materials in use is 0.5Bq per square centimeter. Different Action Levels for certain radioisotopes may be required and will be listed in the conditions of the Internal Radioisotope Permit. The contamination level may be averaged over an area not exceeding 100 square centimeters. Accidental release: Is defined as the accidental release of radioactive material resulting in following levels of radiation levels: o Greater than 2 mSv/hour on the external surface of a package o Greater than 0.1 mSv/hour at a distance of 1m from the package ALI Annual Limit on Intake Added: The International Commission on Radiological Protection (ICRP) has published Annual Limits on Intake of Radionuclides by Workers Based on the 1990 Recommendations (Publication 60) of the ICRP for limiting dose. The annual limit on intake (ALI) is the maximum intake in becquerel (1 Bq = 1 disintegration per second) that a worker may ingest orally and not exceed his/her annual average dose limit as per the 1990 recommendations. This average annual limit was 20 mSv. The ALIs themselves are published in ICRP Publication 61. The CNSC requires the University to classify each area room or enclosure where unsealed radioactive materials are used at a single time as Basic Level if the quantity does not exceed 5ALIs or Intermediate Level if the quantity does not exceed 50ALIs. (addition approved by RSCttee Feb 2, 2006) Applicable Designated Workers and Permit Holders For the purposes of this defining when dosimetry is required (RSP-310), staff and students working in a lab designated as Intermediate according to RSP-411, working with sealed sources over 370 kBq and personnel working in a Basic Laboratory with radioisotopes other than H-3, C-14, S-35, Ca-45 and P-33 may be considered

unknown authors

2005-01-01T23:59:59.000Z

339

Story URL: http://news.medill.northwestern.edu/chicago/news.aspx?id=197040 Story Retrieval Date: 12/8/2011 10:08:09 AM CST  

E-Print Network (OSTI)

communication network weaves together users, electricitystoring substations, largescale generators they used," said K.C. Poulos, the town's sustainability manager. "But if you can give an example like Oak Companies and communities across Illinois are leading innovative smart grid projects. Click on the icons

Kemner, Ken

340

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD EL QOTBI Tuna EL QOTBI Noemie FATMI Karine CLAIR Florian KNISCH Guillaume NAHON Charlotte SEHMOUNE Nabil AD : A

Douai, Antoine

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory November 23, 2009 CX-000206: Categorical Exclusion Determination Michigan Biogas Center of Excellence CX(s) Applied: A9, B3.6 Date: 11232009 Location(s): Flint,...

342

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery and Reinvestment Act State Energy Program - Estacada School District Biomass Boilers CX(s) Applied: B5.1 Date: 08032010 Location(s): Estacada, Oregon Office(s): Energy...

343

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

344

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

345

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B3.6 Date: 03172010 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory March 17, 2010 CX-001327: Categorical...

346

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 CX-009271: Categorical Exclusion Determination National Governors Association Energy Project - Phase II CX(s) Applied: A9, A11 Date: 09102012 Location(s): CX: none...

347

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B1.23 Date: 09242012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory September 24, 2012 CX-009336: Categorical Exclusion...

348

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for High Performance Hospitals CX(s) Applied: A9, A11 Date: 09302010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, National...

349

102nd Annual Meeting Dates to Remember  

Science Conference Proceedings (OSTI)

Dates to Remember November 1, 2010 Online registration opens January 7, 2011 Exhibitor Presentations: Deadline for abstracts to be printed in the abstract book January 31, 2011 Last day for early booth rental fees January 31, 2011 Booths cance

350

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Water Based, Critical Flow, Non-Vapor-Compression Cooling Cycle CX(s) Applied: B3.6 Date: 04302012 Location(s): Kansas...

351

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program- ARRA Revolving Loan Fund- Ivan Smith Furniture- Compressed Natural Gas Vehicle Fueling Stations CX(s) Applied: B5.1, B5.22 Date: 02112013 Location(s):...

352

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar - Roof Mounted - Ebay CX(s) Applied: B5.1 Date: 02082011 Location(s): South Jordan, Utah Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February...

353

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Laboratory April 11, 2011 CX-005602: Categorical Exclusion Determination Jet Drilling With Energized Fluids CX(s) Applied: B3.6, B3.7 Date: 04112011 Location(s):...

354

Property:PublicationDate | Open Energy Information  

Open Energy Info (EERE)

"PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2.8-Ma Ash-Flow Caldera At Chegem River In The Northern Caucasus Mountains (Russia),...

355

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Low-Cost Integrated Substrate for Organic Light-Emitting Diode (OLED) Lighting (Ewing) CX(s) Applied: B3.6 Date: 03192010 Location(s):...

356

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 CX-008228: Categorical Exclusion Determination Hydropower Energy Resource (HyPER) Harvester CX(s) Applied: A9 Date: 04112012 Location(s): New Mexico Offices(s): Golden...

357

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Golden Field Office November 24, 2010 CX-004532: Categorical Exclusion Determination Tidal Energy System for On-Shore Power Generation CX(s) Applied: A9, B3.6 Date: 11242010...

358

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Reactor Technology for Hydro processing Bio-oils to Produce Gasoline, Diesel and Jet Fuel CX(s) Applied: A9, B3.6 Date: 05022011 Location(s): Maryland Office(s): Energy...

359

ORNL 2011-G00248/jcn UT-B ID 201102588  

E-Print Network (OSTI)

repair methods restore performance. Two different, commercially available, split-system, residential results were obtained for the second condenser tested. INTRODUCTION The performance of residential commercially available condensers with different manufactures were tested. Each condenser tested had a rated

Pennycook, Steve

360

GRR/Section 3-ID-a - State Lands Commercial Geothermal Lease | Open Energy  

Open Energy Info (EERE)

3-ID-a - State Lands Commercial Geothermal Lease 3-ID-a - State Lands Commercial Geothermal Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-a - State Lands Commercial Geothermal Lease 03IDAStateLandsCommercialGeothermalLease (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Idaho State Board of Land Commissioners Regulations & Policies Original Administrative Rule Draft Rules Leasing of Public Lands 58-301 et seq Geothermal Resources 47-1605 IX, Section 8 of Idaho's Constitution Triggers None specified Click "Edit With Form" above to add content 03IDAStateLandsCommercialGeothermalLease (1).pdf 03IDAStateLandsCommercialGeothermalLease (1).pdf Error creating thumbnail: Page number not in range.

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

GRR/Section 12-ID-a - State Flora & Fauna Considerations | Open Energy  

Open Energy Info (EERE)

GRR/Section 12-ID-a - State Flora & Fauna Considerations GRR/Section 12-ID-a - State Flora & Fauna Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-ID-a - State Flora & Fauna Considerations 12IDAFloraFaunaConsiderations.pdf Click to View Fullscreen Contact Agencies Idaho Department of Fish & Game Regulations & Policies Idaho Statutes 36.103 Triggers None specified Click "Edit With Form" above to add content 12IDAFloraFaunaConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Fish & Game preserves wildlife against any direct take, including wild animals, birds, and fish under Idaho Statutes 36.103.

362

GRR/Section 14-ID-c - Underground Injection Control | Open Energy  

Open Energy Info (EERE)

4-ID-c - Underground Injection Control 4-ID-c - Underground Injection Control < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-c - Underground Injection Control 14IDCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies IDAPA 37.03.04 IDAPA 37.03.03 Triggers None specified Click "Edit With Form" above to add content Potential Roadblocks Extensive public comments can stretch the timeline since IDWR must respond to all comments, potentially hold a Fact Finding Hearing, and thoroughly review the input received in these processes prior to making a decision to issue or deny the permit. 14IDCUndergroundInjectionControlPermit.pdf

363

GRR/Section 18-ID-d - Solid Waste Management Facilities | Open Energy  

Open Energy Info (EERE)

8-ID-d - Solid Waste Management Facilities 8-ID-d - Solid Waste Management Facilities < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-d - Solid Waste Management Facilities 18IDDSolidWasteManagementFacilities (2).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.06 Triggers None specified Click "Edit With Form" above to add content 18IDDSolidWasteManagementFacilities (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho considers transfer stations, composting operations, incinerators and landfills solid waste management facilities. The state does not require a

364

GRR/Section 18-ID-a - Underground Storage Tank Systems | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-a - Underground Storage Tank Systems GRR/Section 18-ID-a - Underground Storage Tank Systems < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-a - Underground Storage Tank Systems 18IDAUndergroundStorageTankSystems.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.07 Rules Regulating Underground Storage Tank Systems Triggers None specified Click "Edit With Form" above to add content 18IDAUndergroundStorageTankSystems.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires notification

365

GRR/Section 14-ID-f - 401 NPDES Water Quality Certification | Open Energy  

Open Energy Info (EERE)

ID-f - 401 NPDES Water Quality Certification ID-f - 401 NPDES Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-f - 401 NPDES Water Quality Certification 14IDFSection401NPDESWaterQualityCertification.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency U S Army Corps of Engineers Regulations & Policies Idaho Environmental Protection and Health Act Idaho Administrative Procedure Act Triggers None specified Click "Edit With Form" above to add content 14IDFSection401NPDESWaterQualityCertification.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

366

GRR/Section 3-ID-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

3-ID-c - Encroachment Permit 3-ID-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-c - Encroachment Permit 03IDCEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.42 Triggers None specified Click "Edit With Form" above to add content 03IDCEncroachmentPermit.pdf 03IDCEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer needs an Encroachment Permit from the Idaho Transportation Department (ITD) to add, modify, relocate, maintain, or remove an encroachment on the state highway or within the state highway rights-of way

367

GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity | Open  

Open Energy Info (EERE)

GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity GRR/Section 7-ID-c - Certificate of Public Convenience and Necessity < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-ID-c - Certificate of Public Convenience and Necessity 07IDCCertificateOfPublicConvenienceAndNecessity (1).pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies Idaho Code 61-526 IDAPA 31.01.01 Triggers None specified Click "Edit With Form" above to add content 07IDCCertificateOfPublicConvenienceAndNecessity (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Electrical corporations must receive a Certificate of Public Convenience

368

GRR/Section 9-ID-a - State Environmental Process | Open Energy Information  

Open Energy Info (EERE)

9-ID-a - State Environmental Process 9-ID-a - State Environmental Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-ID-a - State Environmental Process 09IDAStateEnvironmentalProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Triggers None specified Click "Edit With Form" above to add content 09IDAStateEnvironmentalProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho has no state-specific EA/EIS equivalent for renewable energy projects. Idaho does have an environmental assessment process for proposed wastewater and drinking water construction projects, but only when grant

369

GRR/Section 14-ID-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-ID-d - Section 401 Water Quality Certification GRR/Section 14-ID-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-d - Section 401 Water Quality Certification 14IDDSection401WaterQualityCertificationProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency U S Army Corps of Engineers Regulations & Policies Idaho Environmental Protection and Health Act Idaho Administrative Procedure Act Triggers None specified Click "Edit With Form" above to add content 14IDDSection401WaterQualityCertificationProcess.pdf 14IDDSection401WaterQualityCertificationProcess.pdf Error creating thumbnail: Page number not in range.

370

GRR/Section 18-ID-c - Wastewater Pretreatment Permit | Open Energy  

Open Energy Info (EERE)

8-ID-c - Wastewater Pretreatment Permit 8-ID-c - Wastewater Pretreatment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-c - Wastewater Pretreatment Permit 18IDCWastewaterPretreatmentPermit.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 18IDCWastewaterPretreatmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Industrial wastewater permits are issued at the local level. If wastewater is not discharged into a municipal sewer system, the nonpoint source and NPDES permit inquiries are sufficient. A common approach to wastewater treatment is to treat on-site. See Idaho's

371

GRR/Section 11-ID-a - State Cultural Considerations | Open Energy  

Open Energy Info (EERE)

-ID-a - State Cultural Considerations -ID-a - State Cultural Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-ID-a - State Cultural Considerations 11IDAStateCulturalConsiderations (2).pdf Click to View Fullscreen Contact Agencies Idaho State Historical Society Regulations & Policies Idaho's Protection of Graves Statute IS 27-503 Triggers None specified Click "Edit With Form" above to add content 11IDAStateCulturalConsiderations (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Idaho has a statute that provides state law protection to cairns and grave sites. The Idaho State Historical Society administers the protections

372

GRR/Section 14-ID-a - Nonpoint Source Pollution | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-a - Nonpoint Source Pollution GRR/Section 14-ID-a - Nonpoint Source Pollution < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-a - Nonpoint Source Pollution 14IDANonpointSourcePollution.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Regulations & Policies Clean Water Act Idaho Code Triggers None specified Click "Edit With Form" above to add content 14IDANonpointSourcePollution.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (IDEQ) developed Idaho's

373

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit | Open  

Open Energy Info (EERE)

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-b - Air Quality Permit - Tier II Operating Permit 15IDBAirQualityPermitTierIIOperatingPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDBAirQualityPermitTierIIOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Tier II Operating Permits are issued to facilities or stationary sources

374

GRR/Section 15-ID-a - Air Quality Permit - Permit to Construct | Open  

Open Energy Info (EERE)

15-ID-a - Air Quality Permit - Permit to Construct 15-ID-a - Air Quality Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-a - Air Quality Permit - Permit to Construct 15IDAAirQualityPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDAAirQualityPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires an air quality

375

GRR/Section 19-ID-a - Water Access and Water Rights | Open Energy  

Open Energy Info (EERE)

19-ID-a - Water Access and Water Rights 19-ID-a - Water Access and Water Rights < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-ID-a - Water Access and Water Rights 19IDAWaterAccessAndWaterRightsIssues.pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies Idaho Code Title 42 Triggers None specified Click "Edit With Form" above to add content 19IDAWaterAccessAndWaterRightsIssues.pdf 19IDAWaterAccessAndWaterRightsIssues.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Water Resources (IDWR) has the exclusive authority for regulation of appropriation of the public surface and ground waters of

376

GRR/Section 18-ID-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-b - Hazardous Waste Permit Process GRR/Section 18-ID-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-b - Hazardous Waste Permit Process 18IDBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies Idaho Hazardous Waste Management Act IDAPA 58.01.05 Rules and Standards for Hazardous Waste 40 CFR 124.31 Pre-application public meeting and notice 40 CRF 124.10 Public notice of permit actions and public comment period 40 CFR 124.12 Public hearings 40 CFR 270.13 Contents of Part A of the permit application Triggers None specified Click "Edit With Form" above to add content 18IDBHazardousWastePermitProcess.pdf 18IDBHazardousWastePermitProcess.pdf

377

DOI-BLM-ID-B010-2010-0083-CX | Open Energy Information  

Open Energy Info (EERE)

ID-B010-2010-0083-CX ID-B010-2010-0083-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-B010-2010-0083-CX CX at {{{GeothermalArea}}} for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Agua Caliente Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments ROW across BLM managed lands for access to TGH locations Time Frame (days) Participating Agencies Lead Agency Idaho Funding Agency none provided Managing District Office Boise Managing Field Office BLM Four Rivers Field Office

378

GRR/Section 20-ID-a - Well Abandonment Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 20-ID-a - Well Abandonment Process GRR/Section 20-ID-a - Well Abandonment Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 20-ID-a - Well Abandonment Process 20IDAWellAbandonmentProcess.pdf Click to View Fullscreen Contact Agencies [[Idaho Department of Water Resources]] Regulations & Policies Drilling for Geothermal Resources Rule 45 Triggers None specified Click "Edit With Form" above to add content 20IDAWellAbandonmentProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the well abandonment procedures in the state of Idaho. The director of the Idaho Department of Water Resources

379

Microsoft Word - DOE-ID-INL-12-028-1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-12-028 EC Document No.: DOE-ID-INL-12-028 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study SECTION B. Project Description: The National Oceanic and Atmospheric Administration (NOAA) Birch Creek Valley Wind Study would be conducted under the umbrella of the NOAA/Idaho National Laboratory (INL) Meteorological Research Partnership Memorandum of Agreement between NOAA and the Idaho Office of the U.S. Department of Energy (DOE-ID). The project would use a location near the northeast corner of the Test Area North (TAN) perimeter fence just north of the old TAN parking lot adjacent to the road to the Initial Engine Test (IET) facility and a remote site along Birch Creek near the point where Birch Creek crosses Idaho Highway 22. Field setup would occur as

380

DOI-BLM-ID-220-2009-EA-3709 | Open Energy Information  

Open Energy Info (EERE)

ID-220-2009-EA-3709 ID-220-2009-EA-3709 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-ID-220-2009-EA-3709 EA at Raft River Geothermal Area for Geothermal/Exploration Raft River Geothermal Drilling Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Agua Caliente, LLC Consultant EMPSi Geothermal Area Raft River Geothermal Area Project Location Idaho Project Phase Geothermal/Exploration Techniques Exploration Drilling Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Twin Falls District Office Managing Field Office Burley Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

GRR/Section 14-ID-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-b - NPDES Permitting Process GRR/Section 14-ID-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-b - NPDES Permitting Process 14IDBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 14IDBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 'National Pollutant Discharge Elimination System Permits' The NPDES program requires facilities discharging from a point source into

382

GRR/Section 6-ID-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-ID-a - Transportation Permit GRR/Section 6-ID-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-a - Transportation Permit 06IDATransportationPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.21 Triggers None specified Click "Edit With Form" above to add content 06IDATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Overlegal permits are issued to protect the "safety and convenience of the general public." The Idaho Transportation Department is also concerned with

383

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-007776: Categorical Exclusion Determination Placing a Facility in an Environmentally Safe Condition CX(s) Applied: B1.28 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007775: Categorical Exclusion Determination Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office January 13, 2012 CX-007547: Categorical Exclusion Determination Turbine Aeration Design Software for Mitigating Adverse Environmental Impacts Resulting From Conventional Hydropower Turbines CX(s) Applied: A9, B3.6 Date: 01/13/2012 Location(s): Minnesota Offices(s): Golden Field Office January 13, 2012 CX-007609: Categorical Exclusion Determination

384

RL-721 Document ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ID Number: ID Number: REV4 NEPA REVIEW SCREENING FORM DOE/CX-00125, Rev 0 I. Project Title: MSA Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B, B5.1 II. Project Description and location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions to conserve energy or

385

Microsoft Word - DOE-ID-INL-12-002.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 SECTION A. Project Title: Underground Storage Tank (UST) Steel Line Replacements SECTION B. Project Description: The Idaho Department of Environmental Quality (DEQ) performed an inspection of Idaho National Laboratory's (INL's) USTs in September of 2011. Inspection results indicated field violations for failing to install and maintain cathodic protection systems for steel lines associated with seven underground storage tanks. DEQ did not accept the INL's "corrosion expert" determination that the installation sites soils were not corrosive enough to cause a release due to corrosion during the lines operating life. This determination was not accepted because the INL corrosion experts did not have specific National Association of Corrosion Engineers (NACE)

386

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

387

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

388

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

389

Facility Owner Contractor Award Date End Date Options/Award Term  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OptionsAward Term Ultimate Potential Expiration Date Contract FY Competed Parent Companies LLC Partners DOE Site Procurement Director DOE Contracting Officer SLAC National...

390

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

391

Computational Age Dating of Special Nuclear Materials  

SciTech Connect

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

392

th e american bir d conse rvan c y g u id e to bird conservation  

E-Print Network (OSTI)

th e american bir d conse rvan c y g u id e to bird conservation by daniel j. lebbin, michael j CONSERVATION 1886 George Grinnell founds the first Audubon So- ciety. 1896 Harriet Hemenway, her cousin Minna conservation for waterfowl and other birds. 1934 Roger Tory Peterson publishes his landmark Field Guide

McReynolds, Ben

393

TEXAS GRANT Statement of Student Eligibility Last Name First Name UT Arlington Student ID  

E-Print Network (OSTI)

TEXAS GRANT Statement of Student Eligibility 2012-2013 Last Name First Name UT Arlington Student ID Effective September 1, 2010, all institutions are required to collect a statement from each TEXAS Grant. TEXAS Grant funds will not disburse to your student account until the statement below is signed

Huang, Haiying

394

TEXAS GRANT Statement of Student Eligibility Last Name First Name UT Arlington Student ID  

E-Print Network (OSTI)

TEXAS GRANT Statement of Student Eligibility 2010-2011 Last Name First Name UT Arlington Student ID Effective September 1, 2010, all institutions are required to collect a statement from each TEXAS Grant. TEXAS Grant funds will not disburse to your student account until the statement below is signed

Corley, Bill

395

TEXAS GRANT Statement of Student Eligibility Last Name First Name UT Arlington Student ID  

E-Print Network (OSTI)

TEXAS GRANT Statement of Student Eligibility 2011-2012 Last Name First Name UT Arlington Student ID Effective September 1, 2010, all institutions are required to collect a statement from each TEXAS Grant. TEXAS Grant funds will not disburse to your student account until the statement below is signed

Corley, Bill

396

IDS: Thermodynamic-kinetic-empirical tool for modelling of solidification, microstructure and material properties  

Science Conference Proceedings (OSTI)

IDS (InterDendritic Solidification) is a thermodynamic-kinetic-empirical tool for simulation of solidification phenomena of steels including phase transformations from melt down to room temperature. In addition, important thermophysical material properties ... Keywords: Continuous casting, Inclusions, Material properties, Microstructure, Solidification

J. Miettinen; S. Louhenkilpi; H. Kytnen; J. Laine

2010-03-01T23:59:59.000Z

397

Non-Unit Faculty Effective Date  

E-Print Network (OSTI)

SUBJECT: Non-Unit Faculty Evaluation Effective Date: 05-18-11 Policy Number: 4-500.1 Supersedes: 4 Adoption: 03-30-05 APPLICABILITY/ACCOUNTABILITY: This policy is applicable to all units and departments that employ non-unit faculty employees in regular positions. POLICY STATEMENT: Non-unit faculty members

Glebov, Leon

398

SAVE THE DATE! UC Energy Week 2011  

E-Print Network (OSTI)

SAVE THE DATE! UC Energy Week 2011 April 4 - 7, 2011 Hosted by the University of California, Davis Building on the success of the 2010 UC Energy Week, the California Renewable Energy Collaborative (CREC) is primed to host UC Energy Week 2011. The event consists of a global energy symposium, three forums

Islam, M. Saif

399

CURRICULUM VITAE Date: December 23, 2010  

E-Print Network (OSTI)

Medical Center (Australia), 2006. Courtney Harrison, University of Kentucky, 2006. Alena Mozhaeva, Joint: Institution: National University of La Plata, Medical School, La Plata, Buenos Aires, Argentina Degree: M.D. Date of Graduation: 1984 Institution: National University of La Plata Medical School, La Plata, Buenos

400

\\1. CONTRACT ID CODE OF PAGES-I PAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

. EFFECTIVE DATE (M/DIY) 4. REQUISITION/PURCHASE REQ. NO. -f 5. PROJECT NO. (Ifapplicable)2. AMENDMENT

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

\\1. CONTRACT ID CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network (OSTI)

. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE (M/DIY) 4. REQUISITIONIPURCHASE REQ. NO. J5. PROJECT NO. (If applicable) M

402

Weasel ID  

NLE Websites -- All DOE Office Websites (Extended Search)

question for you. (You showed up on page 1 of a Yahoo search on "weasel") Our cat recently killed (but didn't mangle) a small mammal of the weasel family (it looks in...

403

Property:Geothermal/AwardDate | Open Energy Information  

Open Energy Info (EERE)

AwardDate Jump to: navigation, search Property Name GeothermalAwardDate Property Type String Description Award Date Retrieved from "http:en.openei.orgwindex.php?titleProperty...

404

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

405

Research Highlights Sorted by Submission Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

406

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

407

Carbon-14 Bomb-Pulse Dating  

Science Conference Proceedings (OSTI)

Atmospheric testing of nuclear weapons during the 1950s and early 1960s doubled the concentration of carbon-14 atmosphere and created a pulse that labeled everything alive in the past 50 years as carbon moved up the food chain. The variation in carbon-14 concentration in time is well-documented and can be used to chronologically date all biological materials since the mid-1950s.

Buchholz, B A

2007-12-16T23:59:59.000Z

408

Summary of potassium/argon dating, 1981. Topical report  

DOE Green Energy (OSTI)

The analytical results for the last fiscal year effort in potassium/argon dating in support of US Department of Energy programs are summarized. Nearly 100 new dates have been generated. Recalibration of the argon extraction tables resulted in refinement of values for tracer ratios and depletion constants for our two extraction lines. Tracer ratios are ({sup 36}Ar/{sup 38}Ar){sub T} = 0.0308 and 0.0000449; ({sup 40}Ar/{sup 38}Ar){sub T} = 0.0501 and 0.0014 for extraction tables 1 and 2, respectively. Tracer depletion constants are -0.0002250 and -0.0005501 for tables 1 and 2, respectively. Initial values for the argon tracer pipettes are 3.2522 x 10{sup -11} moles and 3.9329 x 10{sup -11} moles for tables 1 and 2, respectively.

Evans, S.H. Jr.; Brown, F.H.

1981-09-01T23:59:59.000Z

409

Low energy cyclotron for radiocarbon dating  

Science Conference Proceedings (OSTI)

The measurement of naturally occurring radioisotopes whose half lives are less than a few hundred million years but more than a few years provides information about the temporal behavior of geologic and climatic processes, the temporal history of meteoritic bodies as well as the production mechanisms of these radioisotopes. A new extremely sensitive technique for measuring these radioisotopes at tandem Van de Graaff and cyclotron facilities has been very successful though the high cost and limited availability have been discouraging. We have built and tested a low energy cyclotron for radiocarbon dating similar in size to a conventional mass spectrometer. These tests clearly show that with the addition of a conventional ion source, the low energy cyclotron can perform the extremely high sensitivity /sup 14/C measurements that are now done at accelerator facilities. We found that no significant background is present when the cyclotron is tuned to accelerate /sup 14/C negative ions and the transmission efficiency is adequate to perform radiocarbon dating on milligram samples of carbon. The internal ion source used did not produce sufficient current to detect /sup 14/C directly at modern concentrations. We show how a conventional carbon negative ion source, located outside the cyclotron magnet, would produce sufficient beam and provide for quick sampling to make radiocarbon dating milligram samples with a modest laboratory instrument feasible.

Welch, J.J.

1984-12-01T23:59:59.000Z

410

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

411

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

412

EV Project Overview Report - Project to Date through March 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

to date through March 2012 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity Consumed (AC MWh)...

413

GRR/Section 3-ID-b - State Land Access | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 3-ID-b - State Land Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-b - State Land Access 03IDBStateLandAccess (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Regulations & Policies IDAPA 20.03.08 -Easements on State-Owned Lands Leasing of Public Lands 58-301 et seq Geothermal Resources 47-1605 Triggers None specified Click "Edit With Form" above to add content 03IDBStateLandAccess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

414

Ronald E. Gill (NE), Scoville, ID - Level I Curtis Roth (EM), Idaho  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E. Gill (NE), E. Gill (NE), Scoville, ID - Level I Curtis Roth (EM), Idaho Falls, ID - Level I Jared T. Howerton (NNSA), Oak Ridge, TN - Level I Richard L. Person (NNSA), DOE HQ - Level I Phillip (Tony) A. Polk (EM), Aiken, SC (Savannah River) - Level IV Jane Powell-Dolan (LM), Cincinnati, OH - Level I Eric M. Thompson (NNSA), Oak Ridge, TN - Level II Congratulations to our newly certified FPDs! The Certification Review Board (CRB or 'the Board') convened on Friday, Sep- tember 24 to review certifi- cation candidates and dis- cuss several topics. The Department of Energy (DOE) met the FY2010 tar- gets for the Root Cause Analysis, Corrective Action Plan metrics 7 and 8, as fol- lows: DOE surpassed the target for Metric #7 (95% of pro-

415

GRR/Section 19-ID-b - Change Application Process | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 19-ID-b - Change Application Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-ID-b - Change Application Process 19IDBChangeApplicationProcess (2).pdf Click to View Fullscreen Contact Agencies Idaho Department of Water Resources Regulations & Policies Idaho Code 42-222 Triggers None specified Click "Edit With Form" above to add content 19IDBChangeApplicationProcess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A water right transfer is a change to a water right's point of diversion,

416

Microsoft Word - DOE-ID-12-011 RESL XRF EC.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: DOE-ID/RESL Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development SECTION B. Project Description The DOE-ID Radiological & Environmental Sciences Laboratory (RESL) has a need for a complete state-of-the-art fully automated sequential wavelength-dispersive X-ray fluorescence (WD-XRF) spectrometer system. The WD-XRF spectrometer system will be primarily used for elemental analyses of soil, liquids (waters), air filters, unknown precipitates, and other environmental samples, as well as for quality control of other materials used in the preparation of performance testing materials for radiological and inorganic testing programs. SECTION C. Environmental Aspects / Potential Sources of Impact

417

Microsoft Word - DOE-ID-12-011 RESL XRF EC.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 SECTION A. Project Title: DOE-ID/RESL Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development SECTION B. Project Description The DOE-ID Radiological & Environmental Sciences Laboratory (RESL) has a need for a complete state-of-the-art fully automated sequential wavelength-dispersive X-ray fluorescence (WD-XRF) spectrometer system. The WD-XRF spectrometer system will be primarily used for elemental analyses of soil, liquids (waters), air filters, unknown precipitates, and other environmental samples, as well as for quality control of other materials used in the preparation of performance testing materials for radiological and inorganic testing programs. SECTION C. Environmental Aspects / Potential Sources of Impact

418

Microsoft Word - DOE-ID-INL-13-004 R1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-13-004 R1 EC Document No.: DOE-ID-INL-13-004 R1 SECTION A. Project Description: High Density Fuel Material for Light Water Reactors (LWRs) SECTION B. Project Description: This project proposes to install glove boxes, laboratory equipment and laboratory hoods in the east wing of the Experimental Fuels Facility (EFF), building 794, at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL). The building was previously known as the Contaminated Equipment Storage Building (CESB). The purpose of this project is to support a high density fuel material development activity for Light Water Reactors (LWRs). The proposed action transfers process equipment from the Idaho Nuclear Technology and Engineering Center (INTEC) Chemical Process Plant (CPP)-1634 to EFF. Activities at CPP-1634 were

419

GRR/Section 17-ID-a - Aesthetic Resource Assessment | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 17-ID-a - Aesthetic Resource Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 17-ID-a - Aesthetic Resource Assessment 17IDAAestheticResourceAssessment.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 17IDAAestheticResourceAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

420

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network (OSTI)

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration Flow Coil Design etc. Finger Print Relationship Every evaporator is unique Unstable Region * = examples

Oak Ridge National Laboratory

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Age Dating of Mixed SNM--Preliminary Investigations  

SciTech Connect

Recently we investigated the nuclear forensics problem of age determination for mixed special nuclear material (SNM). Through limited computational mixing experiments and interactive age analysis, it was observed that age dating results are generally affected by the mixing of samples with different assays or even by small radioactive material contamination. The mixing and contamination can be detected through interactive age analysis, a function provided by the Decay Interaction, Visualization and Analysis (DIVA) software developed by NSTec. It is observed that for mixed SNM with two components, the age estimators typically fall into two distinct clusters on the time axis. This suggests that averaging or other simple statistical methods may not always be suitable for age dating SNM mixtures. Instead, an interactive age analysis would be more suitable for age determination of material components of such SNM mixtures. This work was supported by the National Center for Nuclear Security (NCNS).

Yuan, D., Guss, P. P., Yfantis, E., Klingensmith, A., Emer, D.

2011-12-01T23:59:59.000Z

422

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

423

Thme Date Enseignant Thme Date Enseignant AKIN Tuna Suites 16-mai AD Equa diff 24-mai RL  

E-Print Network (OSTI)

Page 1 Page 1 Thème Date Enseignant Thème Date Enseignant AKIN Tuna Suites 16-mai AD Equa diff 24 Probas 23-mai MAC Thème Date Enseignant Thème Date Enseignant AKIN Tuna Configurations 31-mai DT Arithm

Douai, Antoine

424

DOE-EA-1184 Date Prepared:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

425

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

426

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

427

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

428

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

429

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

430

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

431

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

432

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

433

Search Results Quadrats  

NLE Websites -- All DOE Office Websites (Extended Search)

1arr.lasso[3/10/12 2:57:33 PM] 1arr.lasso[3/10/12 2:57:33 PM] Search Results Quadrats Public Quadrats Data collected by the public with the guidance of docents. Click the Quadrat Id to view more details about that record. Quadrat Id School Teacher Prairie Plot 4940 Lederman Science Center Docent16B Fermilab 16B 4941 Lederman Science Center Docent16B Fermilab 16B 4942 Lederman Science Center Docent16B Fermilab 16B 4946 Lederman Science Center Docent16B Fermilab 16B 4947 Lederman Science Center Docent16B Fermilab 16B 4948 Lederman Science Center Docent16B Fermilab 16B 4949 Lederman Science Center Docent16B Fermilab 16B 4950 Lederman Science Center Docent16B Fermilab 16B Database Maintainer: prairie-data@fnal.gov Web Maintainer: ed-webmaster@fnal.gov Last Updated: February 18, 2011 http://eddata.fnal.gov/lasso/quadrats/s-searchresults-quadrat.lasso

434

Grid Transformation Workshop Results Grid Transformation Workshop Results 2 April 2012  

E-Print Network (OSTI)

Grid Transformation Workshop Results April 2012 #12;Grid Transformation Workshop Results 2 April 2012 Grid Transformation Workshop Results plications. We will explore the basics of data modeling Transformation Workshop: Advanced Reading Material Product ID 1024659. The material in this report builds upon

435

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

436

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

437

Property:GBIG/ObservationEndDate | Open Energy Information  

Open Energy Info (EERE)

ObservationEndDate Jump to: navigation, search This is a property of type String. Retrieved from "http:en.openei.orgwindex.php?titleProperty:GBIGObservationEndDate&oldid5093...

438

Property:ASHRAE 169 End Date | Open Energy Information  

Open Energy Info (EERE)

property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:ASHRAE169EndDate&oldid21585" What links here Related changes Special pages Printable...

439

Carbon dating impacts non-proliferation, drug research and climate...  

NLE Websites -- All DOE Office Websites (Extended Search)

25 years of carbon dating. Carbon dating impacts non-proliferation, drug research and climate change Anne M Stark, LLNL, (925) 422-9799, stark8@llnl.gov Lawrence Livermore...

440

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Modification date 12 February 2013 22:43:16 | Open Energy Information  

Open Energy Info (EERE)

have property "Modification dateThis property is a special property in this wiki." with value "12 February 2013 22:43:16". Since there have been only a few results, also nearby...

442

Modification date 10 December 2012 20:23:32 | Open Energy Information  

Open Energy Info (EERE)

have property "Modification dateThis property is a special property in this wiki." with value "10 December 2012 20:23:32". Since there have been only a few results, also nearby...

443

Variability Common to First Leaf Dates and Snowpack in the Western Conterminous United States  

Science Conference Proceedings (OSTI)

Singular value decomposition is used to identify the common variability in first leaf dates (FLD) and April 1 snow water equivalent (SWE) for the western United States during the period 1900 through 2012. Results indicate two modes of joint ...

Gregory J. McCabe; Julio L. Betancourt; Gregory T. Pederson; Mark D. Schwartz

444

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD 3 04-avr MAC  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD 3 04-avr Date Enseignant AKIN Tuna 34 12-avr DT 69 02-mai RL EL QOTBI Noemie 51 11-avr AD 41 30-avr DT FATMI

Douai, Antoine

445

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 28 5 dc. CC 4 3 18 dc. DT  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 28 5 déc. CC 4 3 18 déc Nabil 9 17 déc. SJ 4 0 14 déc. DT Intitule Date Enseignant AKIN Tuna 22 20 déc. PJ EL QOTBI Noemie 63 6

Douai, Antoine

446

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

447

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

448

Header Sheet Doc ID Z OAK RIDGE NATIONAL LABORATORY M. E. Murray  

Office of Legacy Management (LM)

Dames & Moore Dames & Moore Header Sheet Doc ID Z OAK RIDGE NATIONAL LABORATORY M. E. Murray MANAGED BY LOCKHEED MARTIN rNERGY RESEARCH CORPORATION PHONE: (423) 574-5838 FOR THE U.S. DEPARTMENT OF ENERGY FAX: (423) POST OFFICE Box 2 INTERNET: r'0 March 31, 1997 Mr. Andrew Meloy DuPont Environmental Remediation Services DuPont Chambers Works Route 130, Anti-Knocks Building G Deepwater, New Jersey 08023 Dear Mr. Meloy: Radiological Sampling Requirements for the B Ditch Remediation Project, DuPont Chamber Works Site, Deepwater, New Jersey During the week of March 10, staff members of the Oak Ridge National Laboratory, Life Sciences Division, made surface radiation measurcments along the B ditch from 6+00' to the 11+00' markers. These measurements were performed to better define the subsurface

449

GRR/Section 3-ID-e - Term Easement | Open Energy Information  

Open Energy Info (EERE)

e - Term Easement e - Term Easement < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-e - Term Easement 03IDGTermEasement.pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Regulations & Policies IDPA 20.03.08 Idaho Code 58-603 Triggers None specified Click "Edit With Form" above to add content 03IDGTermEasement.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Lands (IDL) requires a Term Easement for access across state lands and for right of ways across state lands. Note, an easement is not required for lands covered under a Geothermal Lease.

450

RL·721 Do~)nt ID Number: REV4 NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Do~)nt ID Number: REV4 NEPA REVIEW SCREENING FORM " 8)( ... /){)(!) 7 !J --Jil.P:G-3·&-'1-2-0·0~~ 1. Project Title: CH2MHill Plateau Remedia t'ion co. - Routine Maintenance and Custodial Services August 2012 to August 2013 11. Project Description and Location (Including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will conduct routine maintenance and custodial services on and near the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CF'R 1021, Appendix B, ex Bl. 3, nRoutine Maintenance Servj.ces" and "Routine

451

Microsoft Word - DOE-ID-INL-13-009 R1.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

09 R1 09 R1 SECTION A. Project Title: National Oceanic and Atmospheric Administration (NOAA) Project Sagebrush Atmospheric Tracer Dispersion Study Revision 1 SECTION B. Project Description: This revision of this EC is being prepared to provide estimated quantities of tracer emissions to account for greenhouse gas (GHG) emissions and to clarify that the National Oceanic and Atmospheric Administration (NOAA) would report GHG emissions as required by Executive Order (EO) 13514. The National Oceanic and Atmospheric Administration's (NOAA) Atmospheric Tracer Dispersion Study, formally called Project Sagebrush, would be conducted under the umbrella of the NOAA/Idaho National Laboratory (INL) Meteorological Research Partnership Memorandum of Agreement (MOA) between NOAA and the Idaho Office of the U.S. Department of Energy (DOE-ID). This MOA

452

Final PHP bench-scale report for the DOE-ID/SAIC sole source contract  

SciTech Connect

The Plasma Hearth Process (PHP) Technology Development Project was established to develop, test, and evaluate a new concept for treating mixed waste. The new concept uses direct current (dc) transferred-arc plasma torch technology to process mixed waste into a glass-like end-product. Under the cognizance of the US Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Focus Area (MWFA), the technology is being explored for its potential to treat mixed waste. Because it is a mature technology, well-understood and commercially available, it is expected to develop rapidly in this new application. This report summarizes the radioactive bench-scale system activities funded under PHP Sole Source Contract DE-AC07-94ID13266 through the end of the contract.

1997-04-01T23:59:59.000Z

453

North Portal Fuel Storage System Fire Hazard Analysis-ESF Surface Design Package ID  

SciTech Connect

The purpose of the fire hazard analysis is to comprehensively assess the risk from fire within the individual fire areas. This document will only assess the fire hazard analysis within the Exploratory Studies Facility (ESF) Design Package ID, which includes the fuel storage system area of the North Portal facility, and evaluate whether the following objectives are met: 1.1.1--This analysis, performed in accordance with the requirements of this document, will satisfy the requirements for a fire hazard analysis in accordance with U.S. Department of Energy (DOE) Order 5480.7A. 1.1.2--Ensure that property damage from fire and related perils does not exceed an acceptable level. 1.1.3--Provide input to the ESF Basis For Design (BFD) Document. 1.1.4 Provide input to the facility Safety Analysis Report (SAR) (Paragraph 3.8).

N.M. Ruonavaara

1995-01-18T23:59:59.000Z

454

Microsoft Word - DOE-ID-INL-12-007_INL-12-033_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 of 2 CX Posting No.: DOE-ID-INL-12-007 SECTION A. Project Title: Geotechnical Core Drilling for USGS 138 SECTION B. Project Description: . The U.S. Geological Survey (USGS) proposes to drill a 1,000-foot deep geotechnical corehole (USGS 138) into the eastern Snake River Plain aquifer. The location of the corehole will be about 4.0 mile(s) east of the city Howe and about 8.5 mile(s) north of the Naval Reactors Facility at the Southeast Quarter of the Southwest Quarter, Section 7, Township 5 North, Range 30 East; lattitude/longitude (WGS84) 43 46 16.1 N / 112 55 27.7W (fig. 1). The purpose of this geotechnical borehole is to obtain geologic, stratigraphic, and hydraulic data to characterize flow in the eastern Snake River Plain aquifer.

455

Report Period: EIA ID NUMBER: Appendix A: Mailing Address: Appendix B:  

U.S. Energy Information Administration (EIA) Indexed Site

Report Period: Report Period: EIA ID NUMBER: Appendix A: Mailing Address: Appendix B: Zip Code - Secure File Transfer option available at: - - - - Email form to: OOG.SURVEYS@eia.doe.gov Fax form to: (202) 586-9772 Email address: Oil & Gas Survey U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 1. Total Acquisitions (Enter the total volume of foreign crude oil acquired during the report month for importation into the United States. This is the sum of column (l), Part III, excluding resubmission.) 2. Offshore Inventories (Enter the total volume of foreign oil owned by the firm, for eventual importation into the United States which is held in storage outside the United States and/or is enroute to the United States as of the

456

Year of Birth Determination Using Radiocarbon Dating of Dental Enamel  

Science Conference Proceedings (OSTI)

Radiocarbon dating is typically an archaeological tool rather than a forensic one. Recently however, we have shown that the amount of radiocarbon present in tooth enamel, as a result of nuclear bomb testing during the cold war, is a remarkably accurate indicator of when a person is born. Enamel isolated from human teeth is processed to form graphite and carbon-14 ({sup 14}C) levels are measured using accelerator mass spectrometry. Since there is no turnover of enamel after it is formed, {sup 14}C levels in the enamel represent {sup 14}C levels in the atmosphere at the time of its formation. In this paper we describe the strategy used to determine the date of birth of an individual based on radiocarbon levels in tooth enamel, focusing on the methodology of this strategy. Year of birth information can significantly assist police investigators when the identity of a deceased individual is unknown. In such cases police will try to match particulars of the unidentified individual (which is often only gender and/or an estimate of age), with particulars from missing persons lists.

Buchholz, B A; Spalding, K L

2009-03-10T23:59:59.000Z

457

Stream sediment detailed geochemical survey for Date Creek Basin, Arizona  

SciTech Connect

Results of the Date Creek Basin detailed geochemical survey are reported. Field and laboratory data are reported for 239 stream sediment samples. Statistical and areal distributions of uranium and possible uranium-related variables are displayed. A generalized geologic map of the area is provided, and pertinent geologic factors which may be of significance in evaluating the potential for uranium mineralization are briefly discussed. Based on stream sediment geochemical data, significant concentrations of uranium are restricted to the Anderson Mine area. The 84th percentile concentrations of U-FL, U-NT, and U-FL/U-NT combined with low thorium/U-NT values reflect increased mobility and enrichment of uranium in the carbonate host rocks of that area. Elements characteristically associated with the uranium mineralization include lithium and arsenic. No well defined diffusion halos suggesting outliers of similar uranium mineralization were observed from the stream sediment data in other areas of the Date Creek Basin. Significant concentrations of U-FL or U-NT found outside the mine area are generally coincident with low U-FL/U-NT values and high concentrations of zirconium, titanium, and phosphorus. This suggests that the uranium is related to a resistate mineral assemblage derived from surrounding crystalline igneous and metamorphic rocks.

Butz, T.R.; Tieman, D.J.; Grimes, J.G.; Bard, C.S.; Helgerson, R.N.; Pritz, P.M.

1980-06-30T23:59:59.000Z

458

Advanced Vehicle Testing Activity - Publications by Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicle Infrastructure and Usage Information (SLIDES) - February 2013 (PDF 2.8MB) SAE Hybrid Vehicle Technologies Symposium: On-Road Results from Charging Infrastructure and...

459

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE  

National Nuclear Security Administration (NNSA)

l PAGE 1 OF 3PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. I 5. PROJECT NO. (If applicable) 180 See Block 16 C 6.1SSUEDBY CODE 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Los Alamos Site Office 3747 West Jemez Road Los Alamos, NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 9A. AMENDMENT OF SOLICITATION NO. Los Alamos National Security, LLC 4200 West Jemez Road 9B. DATED (SEE ITEM 11) Suite 400 10A. MODIFICATION OF Los Alamos, NM 87544 CONTRACT/ORDER NO. DE-AC52-06NA25396 CODE FACILITY CODE 10B. DATED (SEE ITEM 13) December 21, 2005 -~ - - 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

460

Environmental Science and Research Foundation annual technical report to DOE-ID, January , 1995--December 31, 1995  

Science Conference Proceedings (OSTI)

The foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain and provide environmental education and support services related to INEL natural resource issues. Also, the foundation, with its university affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including waste management, environmental restoration, spent nuclear fuels, and land management issues. Major accomplishments during CY1995 can be divided into five categories: environmental surveillance program, environmental education, environmental services and support, ecological risk assessment, and research benefitting the DOE-ID mission.

NONE

1996-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

462

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

463

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

464

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

465

Interannual variability of summer monsoon rainfall onset date across India  

E-Print Network (OSTI)

Variability of Indian summer monsoon onset dates is investigated at 1-degree spatial resolution by applying an agronomic definition (i.e. the first significant rains without a potentially damaging dry spell thereafter) to gridded observed daily rainfall data (19512003). Median onset dates compare well with previous estimates. The inter-quartile range varies from less than two weeks over the monsoon zone and western Ghats, to about a month over the northwestern desert. Local onset date is shown to be poorly correlated with regional-scale definitions of monsoon onset, and this is attributed to low estimates of spatial coherence, found for local onset-date variability. There is a weak relationship between local onset date and the JuneSeptember seasonal rainfall total, while the latter is shown to be more spatially coherentand thus more potential predictableover the monsoon zone than local onset date. 1.

Vincent Moron; Andrew W. Robertson

2009-01-01T23:59:59.000Z

466

United States Government Department of Energy Memorandum DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

*- - *- - ~Lull-- " --- .lUI -4 ru a rlyA IgjUU Z JEf 1325.8 (6-89) EFG (07.90) United States Government Department of Energy Memorandum DATE: SEP 2 2 2003 REPLY TO: IG-34 (A03TG049) Audit Report No.: OAS-L-03-21 sueJEcT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program-2003" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results of our evaluation of the Federal Energy Regulatory Commission's (Commission) cyber security program. The evaluation was initiated in July 2003, and our fieldwork was conducted through September 2003. Our methodology is described in the attachment to this report. INTRODUCTION AND OBJECTIVE As with other Federal organizations, the Commission is increasing its focus on the

467

DATE: REPLY TO Al-rN OF: SVBJECT: TO  

Office of Legacy Management (LM)

i i # - ? 0111 CF 1 Department of Energy .I 1 mbmbfiandum Ny. & / -.q DATE: REPLY TO Al-rN OF: SVBJECT: TO AUG 0 1 19% EM-421 Authorization for Remedial Action at the Former Baker and Williams Warehouses on West 20th Street in New York, New York, under FUSRAP L. Price, OR * The site of the former Baker and Williams Warehouses, currently owned by Ralph Ferrara, Inc., located on West 20th Street in New York City (Manhattan), is designated for inclusion in the Formerly Utilized Sites Remedial Action Project (FUSRAP). This designation is based on the results of a radiological survey and other supplemental information provided in the Designbtion Summary (Attachment 1). The site consists of three adjacent warehouses. Historical information indicates that the site

468

LOGGING IN TO UI-INTEGRATE SELF-SERVICE First-time users must get their Enterprise ID and Enterprise ID Password before logging in to UI-Integrate  

E-Print Network (OSTI)

screen allows you to enter multiple search criteria to narrow your search. Click "Submit" at the bottom the Urbana-Champaign campus. #12;2 2. Once you have selected your campus, enter your Enterprise ID or seniors). · Curriculum (your degree, college, major). 7. To begin registration, Select a Term. Select

Anastasio, Thomas J.

469

Abstract: Keep Your `Steam Tables' up to Date  

Science Conference Proceedings (OSTI)

Keep Your `Steam Tables' up to Date. Allan H. Harvey and William T. Parry. Chem. Eng. Prog., 95(11), 45-49 (Nov. 1999). ...

470

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

471

Revised 2-14-2013 Date ____/_____/___ Participant Number ________________________  

E-Print Network (OSTI)

________________________________________ Age _________ Height ___________ Weight __________ Last name First name Middle initial Date of Birth ____________________________________________ Telephone (home) (_____) _____-________ City ____________________________________________ Telephone (work-ray _________________________ _____/_____/_____ ____________________________ Ultrasound _________________________ _____/_____/_____ ____________________________ Nuclear Medicine

472

WAPA Tribal Webinar Series - topics and dates | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Webinar: Lessons From Iowa: The Economic, Market, and Organizational Issues in Making Bulk Energy Storage Work - February 9, 2012 (new date) NIST Green Button Presentation...

473

PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies...  

NLE Websites -- All DOE Office Websites (Extended Search)

MBG Auditorium PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies - "Big Data at the Pittsburgh Supercomputing Center" Professor Ralph Roskies Pittsburgh...

474

Groundwater Age-Dating for Water Resource Characterization  

The LLNL Groundwater Noble Gas Mass Spectrometry Facility and Capability offers: Less model-dependent than tritium age dating: Traditional tritium age ...

475

EV Project Overview Report - Project to Date through December...  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

476

EV Project Overview Report - Project to Date through September...  

NLE Websites -- All DOE Office Websites (Extended Search)

September 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

477

EV Project Overview Report - Project to Date through June 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

June 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

478

PPPL3146 Preprint Date: October1995, UC420 Overview of DT Results from TFTR  

E-Print Network (OSTI)

.#Duong, 8 R.#Durst, 4 P.C.#Efthimion, D.#Ernst, 9 H.#Evenson, 4 N.#Fisch, R.#Fisher, 8 R.J.#Fonck, 4 E

479

DOE Patents Database - Search Results  

Office of Scientific and Technical Information (OSTI)

Results: Zero matches. Page 1 of 1 Show only () Items Clear all () Items Refine Search Patent Title Inventor(s) Issue Date Patent Number Full Text Top Return to Original...

480

Proceedings of the 2008 International Conference on Electrical Machines Paper ID 1434 DFIG-Based Wind Turbine Fault Diagnosis  

E-Print Network (OSTI)

Proceedings of the 2008 International Conference on Electrical Machines Paper ID 1434 DFIG for electrical and mechanical fault diagnosis in a DFIG-based wind turbine. The investigated technique Generator (DFIG), Discrete Wavelet Transform (DWT), fault diagnosis. I. INTRODUCTION Wind energy conversion

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "date id result" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

NJ WY AK AL CA AR CO CT DE FL GA HI ID KS IL IN IA IA KY LA  

Gasoline and Diesel Fuel Update (EIA)

176, "Annual Report of Natural and Supplemental Gas Supply and Disposition." NJ WY AK AL CA AR CO CT DE FL GA HI ID KS IL IN IA IA KY LA ME MI MA MD MN MS MT MO NE ND OH NV NM NY...

482

ABSTRACT FINAL ID: PP21D-03; TITLE: Quantifying Kinetic Isotope Effect in Speleothems Through Clumped and Oxygen  

E-Print Network (OSTI)

ABSTRACT FINAL ID: PP21D-03; TITLE: Quantifying Kinetic Isotope Effect in Speleothems Through Clumped and Oxygen Isotopes in Laboratory Precipitation Experiments SESSION TYPE: Oral SESSION TITLE: PP21 INSTITUTIONS (ALL): 1. Dept. of Geology & Geophysics, Yale University, New Haven, CT, United States. 2. Inst

483

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Inspector General Office of Audit Services Audit Report The Disposition of Uranium-233 at Oak Ridge National Laboratory DOE/IG-0834 February 2010 Department of Energy Washington, DC 20585 February 18, 2010 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Disposition of Uranium-233 at Oak Ridge National Laboratory" BACKGROUND As a result of the Department of Energy's nuclear weapons program legacy, its Oak Ridge National Laboratory (ORNL) stores about 1.4 metric tons of uranium containing 450 kilograms of uranium-233 (U-233). The material is currently stored in a

484

DOE-ID Bi-Weekly Summary For June 15 to July 6, 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2009 6, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary will be sent to everyone on INL's regular news release distribution list every other week. To be added to this distribution list, please call Brad Bugger at (208) 526-0833. Advanced Mixed Waste Treatment Project June 15: While retrieving waste at the Advanced Mixed Waste Treatment Project, workers discovered a waste bin that was labeled as potentially containing unexploded ordnance. Previous information about the container indicated it probably did not contain unexploded ordnance, but because of the labeling, that information was not considered definitive. An exclusion zone was established around the container, using guidance from INL explosives experts. Additional information is being gathered to definitively determine the contents of the container. (EM-ID-BBWI-AMWTF-2009-0008).

485

AUG-31-04 15,22 FROM,L AND M TECH ID,5052347038 PAGE  

NLE Websites -- All DOE Office Websites (Extended Search)

31-04 15,22 FROM,L AND M TECH 31-04 15,22 FROM,L AND M TECH ID,5052347038 PAGE 3/15 [TX/RX NO 6044] 141003 08/31/2004 TOE 15:22 PAGE 4/15 IC,5052347038 AUG-31-04 15,22 FROM,L AND M TECH PAGE 1 of 9 Supplement Analysis for USE OF THE IO-160B TRANSPORTATION CASK FOR RH-TRUWASTE SHIPMENTS TO WIPP 1.0 INTRODUCTION The U.S. Department of Energy (DOE) is propo~ing to use the CNS lO-160B, Type B Shipping Cask (referred to in this document simply as the lO-160B) to transport remote handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP). DOE originally examined the impacts ofWlPP operations in the Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement, DOE/EIS-OO26-S-2, (SEIS~II). This Supplement Analysis (SA) discusses environmental impacts associated with

486

Program solicitation: Closing date, January 22, 1988  

SciTech Connect

DOE invites small business firms to submit proposals in this sixth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal R and D needs, increasing the commercial application of DOE-supported research results, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

1987-01-01T23:59:59.000Z

487

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

488

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

489

T-582: RSA systems has resulted in certain information being extracted from  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: RSA systems has resulted in certain information being 2: RSA systems has resulted in certain information being extracted from RSA systems that relates to RSA SecurID T-582: RSA systems has resulted in certain information being extracted from RSA systems that relates to RSA SecurID March 17, 2011 - 11:45pm Addthis PROBLEM: Recently EMC's security systems identified an extremely sophisticated cyber attack in progress, targeting their RSA business unit. RSA took a variety of aggressive measures against the threat to protect their business and their customers, including further hardening of their IT infrastructure. PLATFORM: RSA SecurID implementations ABSTRACT: RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products.

490

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 PAGE 1 OF 1 PAGE 1 OF 23 PAGES 2. AMENDMENT/MODIFICATION NO. 13. EFFECTIVE DATE M188 See Block 16C 4. REQUISITION/PURCHASE I5. PROJECT NO. (If applicable) REQ. NO. 6. ISSUED BY CODE U.S. Department of Energy National Nuclear Security Administration Service Center Property and M&O Contract Support Department P.O. Box 5400 Albuquerque, NM 87185·5400 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Pantex Site Office P.O. Box 30030 Amarillo, TX 79120 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) Babcock & Wilcox Technical Services Pantex, LLC PO Box 30020 Amarillo, TX 79120 CODE I FACILITY CODE 9A. AMENDMENT OF SOLICITATION NO. 9B. DATED (SEE ITEM 11)

491

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

492

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE  

NLE Websites -- All DOE Office Websites (Extended Search)

I I PAGE OF PAGES 1 1 2 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REaUISITIONIPURCHASE REa. NO. 15. PROJECT NO. (If applicable) 335 See Block 16C 12SCOO0484 Item 7 6. ISSUED BY CODE 00518 7. ADMINISTERED 8Y (If other than Item 6) CODE 100518 Oak Ridge Oak Ridge U.S. Department of Energy U.S. Department of Energy P.O. Box 2001 P.O. Box 2001 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .* stroot. COlUlty. Stato and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION NO. f-'-- o AK RIDGE ASSOCIATED UNIVERSITIES, INC. P.O. BOX 117 98. DATED (SEE ITEM 11) o AK RIDGE TN 37830-6218 x 10A. MODIFICATION OF CONTRACTIORDER NO. DE-AC05-060R23100 108. DATED (SEE /TEM 13) CODE 041152224 FACILITY CODE 12/21/2005 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

493

Summary of potassium/argon age dating, 1979  

DOE Green Energy (OSTI)

During FY-79 the K/Ar dating laboratory at the Department of Geology and Geophysics of the University of Utah became operational. During the past calendar year forty-seven dates have been produced from areas predominantly in Utah. Dating has also been done on areas in Nevada and Montana through the State-Coupled program and Case Studies Support program. Areas in wich activity was concentrated include: Cove Creek Domes/Twin Peaks Area, SW Utah. Here volcanic activity spanned the time from 2.74 to 2.35 M.Y., with a mean age of 2.50 +- 0.14 M.Y. Black Rock Desert, SW Utah. Two dates on a single flow indicate an age of 1.49 +- 0.08 M.Y. for a flow previously undated. Wildcat Creek Area, SW Utah. Dating of rhyolite flows from this area gives a mean age of volcanism of 9.25 +- 0.16 M.Y., considerably older than previously inferred by the work of Haugh (1978). Mineral Mountains Pluton, SW Utah. Twelve dates on phases of the pluton indicate a complex history of intrusion, and more work is indicated in order to derive a coherent picture of the magmatic events leading to the formation of this batholith. Blackfoot Reservoir, Idaho. Two dates on rhyolite domes, previously updated, give ages of 1.56 +- 0.06 M.Y. and 1.28 +- 0.15 M.Y.

Evans, S.H. Jr.

1980-02-01T23:59:59.000Z

494

On the Prediction of the Occurence of dates of GLEs  

E-Print Network (OSTI)

Ground level enhancements (GLEs) are relativistic sol particles measured at ground level by a worldwide network of cosmic ray detectors. These sporadic events are associated with solar flares and are assumed to be of a quasi-random nature. Their study gives us information about their source and propagation processes, about the maximum capacity of the sun as a particle accelerator engine, about the magnetic structure of the medium traversed, etc. Space vehicles may be damaged by this kind of radiation, as well as electric transformers and gas pipes at high latitudes. As a result, their prediction has turned out to be very important, but because of their random occurrence, up to now few efforts to this end have been made. The results of these efforts have been limited to possible warnings in real time, just before GLE occurrence, but no specific dates have been predicted well enough in advance to prevent possible hazards. In this study we show that, in spite of the quasi-stochastic nature of GLEs, it is possibl...

Prez-Peraza, Jorge; Zapotitla-Romn, Julin; Alvarez-Madrigal, Manuel

2013-01-01T23:59:59.000Z

495

Detection and Analysis of Threats to the Energy Sector: DATES  

Science Conference Proceedings (OSTI)

This report summarizes Detection and Analysis of Threats to the Energy Sector (DATES), a project sponsored by the United States Department of Energy and performed by a team led by SRI International, with collaboration from Sandia National Laboratories, ArcSight, Inc., and Invensys Process Systems. DATES sought to advance the state of the practice in intrusion detection and situational awareness with respect to cyber attacks in energy systems. This was achieved through adaptation of detection algorithms for process systems as well as development of novel anomaly detection techniques suited for such systems into a detection suite. These detection components, together with third-party commercial security systems, were interfaced with the commercial Security Information Event Management (SIEM) solution from ArcSight. The efficacy of the integrated solution was demonstrated on two testbeds, one based on a Distributed Control System (DCS) from Invensys, and the other based on the Virtual Control System Environment (VCSE) from Sandia. These achievements advance the DOE Cybersecurity Roadmap [DOE2006] goals in the area of security monitoring. The project ran from October 2007 until March 2010, with the final six months focused on experimentation. In the validation phase, team members from SRI and Sandia coupled the two test environments and carried out a number of distributed and cross-site attacks against various points in one or both testbeds. Alert messages from the distributed, heterogeneous detection components were correlated using the ArcSight SIEM platform, providing within-site and cross-site views of the attacks. In particular, the team demonstrated detection and visualization of network zone traversal and denial-of-service attacks. These capabilities were presented to the DistribuTech Conference and Exhibition in March 2010. The project was hampered by interruption of funding due to continuing resolution issues and agreement on cost share for four months in 2008. This resulted in delays in finalizing agreements with commercial partners, and in particular the Invensys testbed was not installed until December 2008 (as opposed to the March 2008 plan). The project resulted in a number of conference presentations and publications, and was well received when presented at industry forums. In spite of some interest on the part of the utility sector, we were unfortunately not able to engage a utility for a full-scale pilot deployment.

Alfonso Valdes

2010-03-31T23:59:59.000Z

496

Microsoft Word - DOE-ID-12-030 Wisconsin-Madison.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30 30 SECTION A. Project Title: Infrastructure for Advanced Reactor Materials Center SECTION B. Project Description SECTION C. Environmental Aspects / Potential Sources of Impact The action consists of funding the modification of existing facilities purchase of equipment, and move equipment to a new existing location. The action would not create additional environmental impacts above those already occurring at the university. SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date. Note: For Categorical Exclusions (CXs) the proposed action must not: 1) threaten a violation of applicable statutory, regulatory, or permit

497

Save Energy, Save Date Night | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu...

498

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Science Undergraduate Laboratory Internships (SULI) SULI Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. SULI Internship Term: Spring 2014 Summer 2014* Fall 2013 On-line Application Opens August 6, 2013 October 18, 2013 May 1, 2013 Applications Due October, 1, 2013 5:00 PM ET January 10, 2014 5:00 PM ET June 12, 2013 5:00 PM ET Offer Notification Period Begins on or around October, 15, 2013 January 20, 2014 June 24, 2013

499

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2014 On-line Application Opens October 18, 2013 Applications Due January 10, 2014 5:00 PM ET* Offer Notification Period Begins January 20, 2014 All DOE Offers and Notifications Complete April 1, 2014 *A research proposal co-developed with a DOE laboratory researcher must be electronically submitted by all faculty applicants as part of their

500

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Categorical Exclusion Determination 81: Categorical Exclusion Determination Solar Instructor Training Network - Midwest Provider CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Wisconsin Offices(s): Golden Field Office January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 27, 2012 CX-007879: Categorical Exclusion Determination Wasatch SunShot Streamlining and Simplifying Solar CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Utah Offices(s): Golden Field Office January 27, 2012 CX-007878: Categorical Exclusion Determination Texas Solar Collaboration to Streamline and Enable An Increase in Photovoltaic Capacity CX(s) Applied: A9, A11 Date: 01/27/2012