Powered by Deep Web Technologies
Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

RTD Biodiesel (B20) Transit Bus Evaluation: Interim Review Summary  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

RTD Biodiesel (B20) Transit RTD Biodiesel (B20) Transit Bus Evaluation: Interim Review Summary K. Proc, R. Barnitt, and R.L. McCormick Technical Report NREL/TP-540-38364 August 2005 RTD Biodiesel (B20) Transit Bus Evaluation: Interim Review Summary K. Proc, R. Barnitt, and R.L. McCormick Prepared under Task No. FC05.9400 Technical Report NREL/TP-540-38364 August 2005 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle Contract No. DE-AC36-99-GO10337 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

2

RTD Biodiesel (B20) Transit Bus Evaluation: Interim Review Summary  

DOE Green Energy (OSTI)

A summary of the data NREL collected from a project to evaluate the in-use performance of buses from the Regional Transportation District of Denver operating on B20.

Proc, K.; Barnitt, R.; McCormick, R. L.

2005-08-01T23:59:59.000Z

3

Technology Validation: Fuel Cell Bus Evaluations (Presentation)  

DOE Green Energy (OSTI)

This presentation by Leslie Eudy at the 2007 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's fuel cell bus evaluations.

Eudy, L.

2007-05-18T23:59:59.000Z

4

Technology Validation: Fuel Cell Bus Evaluations (Poster)  

DOE Green Energy (OSTI)

Poster discusses hydrogen fuel cell transit bus evaluations conducted for the Hydrogen, Fuel Cells, & Infrastructure Technologies Program (HFCIT). It was presented at the 2006 HFCIT Program Review.

Eudy, L.

2006-05-01T23:59:59.000Z

5

Technology Validation: Fuel Cell Bus Evaluations  

DOE Green Energy (OSTI)

Presentation for the 2005 U.S. Department of Energy Hydrogen Program review showing status of U.S. and international fuel cell transit bus evaluations.

Eudy, L.

2005-05-01T23:59:59.000Z

6

Fuel Cell Bus Evaluation Results (Presentation)  

DOE Green Energy (OSTI)

Presentation on the results from the DOE fuel cell bus evaluation given at the Transportation Research Board's 87th annual meeting, January 14, 2008.

Eudy, L.

2008-01-14T23:59:59.000Z

7

Analysis of the University of Texas at Austin compressed natural gas demonstration bus. Interim research report  

Science Conference Proceedings (OSTI)

A demonstration compressed natural gas (CNG) bus has been operating on The University of Texas at Austin shuttle system since 1992. This CNG vehicle, provided by the Blue Bird Company, was an opportunity for the University to evaluate the effectiveness of a CNG bus for shuttle operations. Three basic operating comparisons were made: (1) fuel consumption, (2) tire wear, and (3) vehicle performance. The bus was equipped with a data logger, which was downloaded regularly, for trip reports. Tire wear was monitored regularly, and performance tests were conducted at the Natural Gas Vehicle Technology Center. Overall, the data suggest that fuel costs for the CNG bus are comparable to those for University diesel buses. This is a result of the lower fuel price for natural gas. Actual natural gas fuel consumption was higher for the CNG buses than for the diesel buses. Due to weight differences, tire wear was much less on the CNG buses. Finally, after installation of a closed-loop system, the CNG bus out-performed the diesel bus on acceleration, grade climbing ability, and speed.

Wu, C.M.; Matthews, R.; Euritt, M.

1994-06-01T23:59:59.000Z

8

Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results  

DOE Green Energy (OSTI)

This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

Chandler, K.; Eudy, L.

2008-10-01T23:59:59.000Z

9

SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: First Results Report  

DOE Green Energy (OSTI)

This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This report provides the early data results and implementation experience of the AT fuel cell bus since it was placed in service.

Eudy, L.; Chandler, K.

2011-03-01T23:59:59.000Z

10

SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report  

DOE Green Energy (OSTI)

SunLine Transit Agency, which provides public transit services to the Coachella Valley area of California, has demonstrated hydrogen and fuel cell bus technologies for more than 10 years. In May 2010, SunLine began demonstrating the advanced technology (AT) fuel cell bus with a hybrid electric propulsion system, fuel cell power system, and lithium-based hybrid batteries. This report describes operations at SunLine for the AT fuel cell bus and five compressed natural gas buses. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) is working with SunLine to evaluate the bus in real-world service to document the results and help determine the progress toward technology readiness. NREL has previously published three reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from February 2012 through November 2012.

Eudy, L.; Chandler, K.

2013-01-01T23:59:59.000Z

11

SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Third Results Reports  

DOE Green Energy (OSTI)

This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. NREL has previously published two reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from July 2011 through January 2012.

Eudy, L.; Chandler, K.

2012-05-01T23:59:59.000Z

12

Testing and Evaluation of Batteries for a Fuel Cell Powered Hybrid Bus  

SciTech Connect

Argonne National Laboratory conducted performance characterization and life-cycle tests on various batteries to qualify them for use in a fuel cell/battery hybrid bus. On this bus, methanol-fueled, phosphoric acid fuel cells provide routine power needs, while batteries are used to store energy recovered during bus braking and to produce short-duration power during acceleration. Argonne carried out evaluation and endurance testing on several lead-acid and nickel/cadmium batteries selected by the bus developer as potential candidates for the bus application. Argonne conducted over 10,000 hours of testing, simulating more than 80,000 miles of fuel cell bus operation, for the nickel/cadmium battery, which was ultimately selected for use in the three hybrid buses built under the direction of H-Power Corp.

Miller, J.F.; Webster, C.E.; Tummillo, A.F.; DeLuca, W.H.

1997-05-01T23:59:59.000Z

13

Alternative fuel transit buses: Interim results from the National Renewable Energy Laboratory (NREL) Vehicle Evaluation Program  

DOE Green Energy (OSTI)

The transit bus program is designed to provide a comprehensive study of the alternative fuels currently used by the transit bus industry. The study focuses on the reliability, fuel economy, operating costs, and emissions of vehicles running on the various fuels and alternative fuel engines. The alternative fuels being tested are methanol, ethanol, biodiesel and natural gas. The alternative fuel buses in this program use the most common alternative fuel engines from the heavy-duty engine manufacturers. Data are collected in four categories: Bus and route descriptions; Bus operating data; Emissions data; and, Capital costs. The goal is to collect 18 months of data on each test bus. This report summarizes the interim results from the project to date. The report addresses performance and reliability, fuel economy, costs, and emissions of the busses in the program.

Motta, R.; Norton, P.; Kelly, K.J.; Chandler, K.

1995-05-01T23:59:59.000Z

14

SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Second Results Report and Appendices  

Science Conference Proceedings (OSTI)

This report describes operations at SunLine Transit Agency for their newest prototype fuel cell bus and five compressed natural gas (CNG) buses. In May 2010, SunLine began operating its sixth-generation hydrogen fueled bus, an Advanced Technology (AT) fuel cell bus that incorporates the latest design improvements to reduce weight and increase reliability and performance. The agency is collaborating with the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to evaluate the bus in revenue service. This is the second results report for the AT fuel cell bus since it was placed in service, and it focuses on the newest data analysis and lessons learned since the previous report. The appendices, referenced in the main report, provide the full background for the evaluation. They will be updated as new information is collected but will contain the original background material from the first report.

Eudy, L.; Chandler, K.

2011-10-01T23:59:59.000Z

15

King County Metro Transit Hybrid Articulated Buses: Interim Evaluation Results  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

King County Metro Transit King County Metro Transit Hybrid Articulated Buses: Interim Evaluation Results K. Chandler Battelle K. Walkowicz National Renewable Energy Laboratory Technical Report NREL/TP-540-39742 April 2006 King County Metro Transit Hybrid Articulated Buses: Interim Evaluation Results K. Chandler Battelle K. Walkowicz National Renewable Energy Laboratory Prepared under Task No. FC06.3000 Technical Report NREL/TP-540-39742 April 2006 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle Contract No. DE-AC36-99-GO10337 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

16

Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Third Evaluation Report and Appendices  

DOE Green Energy (OSTI)

This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The prototype fuel cell bus was manufactured by Van Hool and ISE Corp. and features an electric hybrid drive system with a UTC Power PureMotion 120 Fuel Cell Power System and ZEBRA batteries for energy storage. The fuel cell bus started operation in April 2007, and evaluation results through October 2009 are provided in this report.

Chandler, K.; Eudy, L.

2010-01-01T23:59:59.000Z

17

New York City Transit Hybrid and CNG Transit Buses: Interim Evaluation Results  

DOE Green Energy (OSTI)

This report focuses on the evaluation of compressed natural gas (CNG) and diesel hybrid electric bus propulsion systems in New York City Transit's transit buses.

Chandler, K.; Eberts, E.; Eudy, L.

2006-01-01T23:59:59.000Z

18

SunLine Transit Agency Fuel Cell Transit Bus: Fourth Evaluation Report (Report and Appendices)  

DOE Green Energy (OSTI)

This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five new compressed natural gas (CNG) buses. This is the fourth evaluation report for this site, and it describes results and experiences from April 2008 through October 2008. These results are an addition to those provided in the previous three evaluation reports.

Chandler, K.; Eudy, L.

2009-01-01T23:59:59.000Z

19

SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report (Report and Appendices)  

DOE Green Energy (OSTI)

This report describes operations at SunLine Transit Agency for a prototype fuel cell bus and five compressed natural gas (CNG) buses. This is the fifth evaluation report for this site, and it describes results and experiences from October 2008 through June 2009. These results are an addition to those provided in the previous four evaluation reports.

Eudy, L.; Chandler, K.

2009-08-01T23:59:59.000Z

20

Study on Intelligent Control Strategy of Battery-Electric Bus Based on the Fuzzy Comprehensive Evaluation Method  

Science Conference Proceedings (OSTI)

How to use the lithium-ion power battery effectively, how to improve the discharging efficiency and the cycle-life of the power battery is a hotspot of research in battery-electric vehicle(BEV) field. The fuzzy comprehensive evaluation method is used ... Keywords: battery-electric bus, CAN-bus, control strategy, fuzzy comprehensive evaluation method

Lin Cheng; Zhou Hui; Sun Fengchun; Nan Jinrui

2009-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second Evaluation Report and Appendices  

DOE Green Energy (OSTI)

This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The evaluation period in this report (January 2008 through February 2009) has been chosen to coincide with a UTC Power propulsion system changeout that occurred on January 15, 2008.

Chandler, K.; Eudy, L.

2009-05-01T23:59:59.000Z

22

ICPP radioactive liquid and calcine waste technologies evaluation. Interim report  

SciTech Connect

The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

1994-06-01T23:59:59.000Z

23

National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)  

DOE Green Energy (OSTI)

This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

Chandler, K.; Eudy, L.

2009-01-01T23:59:59.000Z

24

St. Louis Metro Biodiesel (B20) Transit Bus Evaluation: 12-Month Final Report  

DOE Green Energy (OSTI)

The St. Louis Metro Bodiesel Transit Bus Evaluation project is being conducted under a Cooperative Research and Development Agreement between NREL and the National Biodiesel Board to evaluate the extended in-use performance of buses operating on B20 fuel. The objective of this research project is to compare B20 and ultra-low sulfur diesel buses in terms of fuel economy, veicles maintenance, engine performance, component wear, and lube oil performance.

Barnitt, R.; McCormick, R. L.; Lammert, M.

2008-07-01T23:59:59.000Z

25

King County Metro Transit Hybrid Articulated Transit Buses: Interim Evaluation Results  

DOE Green Energy (OSTI)

Interim technical report compares and evaluates new diesel and diesel hybrid-electric articulated buses operated as part of the King County Metro Transit (KC Metro) fleet in Seattle, Washington.

Chandler, K.; Walkowicz, K.

2006-04-01T23:59:59.000Z

26

SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report  

NLE Websites -- All DOE Office Websites (Extended Search)

SunLine Transit Agency SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report L. Eudy and K. Chandler Technical Report NREL/TP-5600-57560 January 2013 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report L. Eudy and K. Chandler Prepared under Task No. HT12.8210 Technical Report NREL/TP-5600-57560 January 2013 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

27

Early Results from DOE/NREL Transit Bus Evaluations  

DOE Green Energy (OSTI)

Presentation at 2005 American Public Transportation Association Conference provides status of NREL/DOE evaluations of New York City Transit and King County Metro hybrid electric buses.

Eudy, L.; Chandler, K.

2005-05-01T23:59:59.000Z

28

Update from the NREL Alternative Fuel Transit Bus Evaluation Program  

DOE Green Energy (OSTI)

The object of this project, which is supported by the U.S. Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL), is to provide a comprehensive comparison of heavy-duty urban transit buses operating on alternative fuels and diesel fuel. Final reports from this project were produced in 1996 from data collection and evaluation of 11 transit buses from eight transit sites. With the publication of these final reports, three issues were raised that needed further investigation: (1) the natural gas engines studied were older, open-loop control engines; (2) propane was not included in the original study; and (3) liquefied natural gas (LNG) was found to be in the early stages of deployment in transit applications. In response to these three issues, the project has continued by emissions testing newer natural gas engines and adding two new data collection sites to study the newer natural gas technology and specifically to measure new technology LNG buses.

Chandler, K. (Battelle); Norton, P. (National Renewable Energy Laboratory); Clark, N. (West Virginia University)

1999-05-01T23:59:59.000Z

29

Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Interim Test Procedures for Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications S. Chakraborty, W. Kramer, B. Kroposki, G. Martin, P. McNutt, M. Kuss, T. Markel, and A. Hoke Technical Report NREL/TP-5500-51001 June 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications S. Chakraborty, W. Kramer, B. Kroposki, G. Martin, P. McNutt, M. Kuss, T. Markel,

30

Research development and demonstration of a fuel cell/battery powered bus system. Interim report, August 1, 1991--April 30, 1992  

DOE Green Energy (OSTI)

This report describes the progress in the Georgetown University research, development and demonstration project of a fuel cell/battery powered bus system. The topics addressed in the report include vehicle design and application analysis, technology transfer activities, coordination and monitoring of system design and integration contractor, application of fuel cells to other vehicles, current problems, work planned, and manpower, cost and schedule reports.

Romano, S.; Wimmer, R.

1992-04-30T23:59:59.000Z

31

Hydrogen and Fuel Cell Transit Bus Evaluations: Joint Evaluation Plan for the U.S. Department of Energy and the Federal Transit Administration (Report and Appendix)  

DOE Green Energy (OSTI)

This document describes the hydrogen transit bus evaluations performed by the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) and the U.S. Department of Transportation's Federal Transit Administration (FTA).

Eudy, L.; Chandler, K.

2008-05-01T23:59:59.000Z

32

New York City Transit Hybrid and CNG Transit Buses: Interim Evaluation Results  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

New York City Transit Hybrid New York City Transit Hybrid and CNG Transit Buses: Interim Evaluation Results K. Chandler and E. Eberts Battelle L. Eudy National Renewable Energy Laboratory Technical Report NREL/TP-540-38843 January 2006 New York City Transit Hybrid and CNG Transit Buses: Interim Evaluation Results K. Chandler and E. Eberts Battelle L. Eudy National Renewable Energy Laboratory Prepared under Task No. FC06.3000 Technical Report NREL/TP-540-38843 January 2006 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle Contract No. DE-AC36-99-GO10337 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

33

FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report  

SciTech Connect

This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

Barnitt, R.

2010-05-01T23:59:59.000Z

34

Nondestructive Evaluation: Buried Pipe NDE Technology Assessment and Development Interim Report  

Science Conference Proceedings (OSTI)

This is an interim progress report for the Electric Power Research Institute (EPRI) project “Assessment and Development of Buried Pipe Nondestructive Evaluation Technology,” which is planned to continue through 2013. The project is a part of EPRI’s overall strategy to close the industry’s underground pipe infrastructure gaps, as described in the nuclear power industry’s “Underground Piping and Tank Integrity Strategic Roadmap.” ...

2012-09-28T23:59:59.000Z

35

Lessons Learned: Battery-Electric Transit-Bus Opportunity Charging  

Science Conference Proceedings (OSTI)

This document details the results of a study of battery-electric bus opportunity charging. This document is an interim report pending conclusion of further experiments with at least one other rapid-charging system and battery type.

1999-12-10T23:59:59.000Z

36

Weatherization Works: An interim report of the National Weatherization Evaluation  

SciTech Connect

The National Weatherization Evaluation is the first comprehensive evaluation of the Weatherization Assistance Program since 1984. The evaluation was designed to accomplish the following goals: Estimate energy savings and cost effectiveness; Assess nonenergy impacts; Describe the weatherization network; Characterize the eligible population and resources; and Identify factors influencing outcomes and opportunities for the future. As a national program, weatherization incorporates considerable diversity due to regional differences. Therefore, evaluation results are presented both in aggregate and for three climate regions: cold, moderate and hot.

Brown, M.A.; Berry, L.G. [Oak Ridge National Lab., TN (United States); Kinney, L.F. [Synertech Systems Corp., Syracuse, NY (United States)

1993-11-01T23:59:59.000Z

37

EVALUATION OF ULTIMATE DISPOSAL METHOD FOR LIQUID AND SOLID RADIOACTIVE WASTES. PART I. INTERIM LIQUID STORAGE  

SciTech Connect

As the first part of a study to evaluate the economics of the various steps leading to and including the permanent disposal of high-activity liquid and solid radioactive waste, costs of interim liquid storage of acid and alkaline Purex and Thorex wastes were estimated for storage times of 0.5 to 30 years. A 6- ton/day plant was assumed, processing 1500 tons/year of uranium converter fuel at a burnup of 10,000 Mwd/ton and 270 tons/year of thorium converter fuel at a burnup of 20,000 Mwd/ton. Tanks of Savannah River design were assumed, with stainless steel construction for acid wastes and mild steel construction for neutralized wastes. The operating cycle of each tank was assumed to consist of equal filling and emptying periods plus a full (or dead) period. With interim storage time defined as filling time plus full time, tank costs were minimum when full time was 40 to 70% of the interim storage time, using present worth considerations. For waste storage times of 0.5 to 30 years, costs ranged from 2.2 x 10/sup -3/ to 9.5 x 10/sup -3/ mill/kwh/sub e/ for acid wastes and from 1.7 x 10/sup -3/ to 5.1 x 10/sup -3/ mill/kwh/sub e/ for neutralized wastes. (auth)

Bradshaw, R.L.; Perona, J.J.; Roberts, J.T.; Blomeke, J.O.

1961-08-22T23:59:59.000Z

38

Interim Report  

E-Print Network (OSTI)

Interim Report FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the MELCOR computer code for leak path factor applications, relative to established requirements. This evaluation, a “gap analysis, ” is performed to meet Commitment 4.2.1.3 of the Department of Energy’s Implementation Plan to resolve SQA issues identified in Defense Nuclear Facilities Safety Board Recommendation 2002-1. Suggestions for corrections or improvements to this document should be addressed to:

Melcor Gap Analysis; Intentionally Blank; Chip Lagdon

2004-01-01T23:59:59.000Z

39

Plug-in Hybrid Electric Bus Demonstration: Long Island, New York  

Science Conference Proceedings (OSTI)

Initiated in 2003, this plug-in hybrid electric vehicle (PHEV) bus program has three major phases: Odyne/EPRI Design and Build Phases coupled with Odyne/Long Island Power Authority (LIPA) Demonstration Phase. This interim report describes completion of an initial demonstration with Long Island Bus (LI Bus) Mass Transit Authority (MTA).

2008-10-21T23:59:59.000Z

40

Interim Results from Alternative Fuel Truck Evaluation Project  

DOE Green Energy (OSTI)

The objective of this project, which is supported by the U.S. Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL), is to provide a comprehensive comparison of heavy-duty trucks operating on alternative fuels and diesel fuel. Data collection from up to eight sites is planned. Currently, the project has four sites: Raley's in Sacramento, CA (Kenworth, Cummins LlO-300G, liquefied natural gas - LNG); Pima Gro Systems, Inc. in Fontana, CA (White/GMC, Caterpillar 31768 Dual-Fuel, compressed natural gas - CNG); Waste Management in Washington, PA (Mack, Mack E7G, LNG); and United Parcel Service in Hartford, CT (Freightliner Custom Chassis, Cummins B5.9G, CNG). This paper summarizes current data collection and evaluation results from this project.

Kevin L. Chandler; Paul Norton; Nigel Clark

1999-05-03T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans  

Science Conference Proceedings (OSTI)

The southern ocean cloud cover modeled by the ERA-interim and MERRA reanalyses are compared against MODIS and MISR observations. ERA-interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the ...

Catherine M. Naud; James F. Booth; Anthony D. Del Genio

42

Evaluation of 2004 Toyota Prius Hybrid Electric Drive System Interim Report  

SciTech Connect

Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

Ayers, C.W.

2004-11-23T23:59:59.000Z

43

Fuel Cell Bus Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

ASTs UTC: demonstrating long lifetime in real UTC: demonstrating long lifetime in real-world bus operation world bus operation Ballard: developing strategies to Ballard:...

44

New York City Transit Hybrid and CNG Transit Buses: Interim Evaluation...  

NLE Websites -- All DOE Office Websites (Extended Search)

CA Peterbilt378, Class 8 truck Cummins Westport ISXG high pressure direct injection LNG and diesel Complete and reported IndyGo Indianapolis, IN Ebus 22-ft bus Series hybrid,...

45

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

46

Washington Metropolitan Area Transit Authority: Compressed Natural Gas Transit Bus Evaluation  

DOE Green Energy (OSTI)

Evaluates compressed natural gas (CNG) powered transit buses at Washington Metropolitan Area Transit Authority (WMATA), providing a comparison between them and standard diesel transit buses.

Chandler, K.; Eberts, E.; Melendez, M.

2006-04-01T23:59:59.000Z

47

Evaluation of 2004 Toyota Prius Hybrid Electic Drive System Interim Report - Revised  

SciTech Connect

The 2004 Toyota Prius is a hybrid automobile equipped with a gasoline engine and a battery-powered electric motor. Both of these motive power sources are capable of providing mechanical drive power for the vehicle. The engine can deliver a peak power output of 57 kilowatts (kW) at 5000 revolutions per minute (rpm) while the motor can deliver a peak power output of 50 kW at 1300 rpm. Together, this engine-motor combination has a specified peak power output of 82 kW at a vehicle speed of 85 kilometers per hour (km/h). In operation, the 2004 Prius exhibits superior fuel economy compared to conventionally powered automobiles. Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

Ayers, C.W.; Hsu, J.S.; Marlino, L.D.; Miller, C.W.; Ott, G.W., Jr.; Oland, C.B.; Burress, T.A.

2007-07-31T23:59:59.000Z

48

Analysis of a diesel-electric hybrid urban bus system  

DOE Green Energy (OSTI)

A hybrid bus powered by a diesel engine and a battery pack has been analyzed over an idealized bus-driving cycle in Chicago. Three hybrid configurations, two parallel and one series, have been evaluated. The results indicate that the fuel economy of a hybrid bus, taking into account the regenerative braking, is comparable with that of a conventional diesel bus. Life-cycle costs are slightly higher because of the added weight and cost of the battery.

Marr, W.W.; Sekar, R.R. [Argonne National Lab., IL (United States); Ahlheim, M.C. [Regional Transportation Authority, Chicago, IL (United States)

1993-08-01T23:59:59.000Z

49

Evaluation of groundwater flow and transport at the Shoal underground nuclear test: An interim report  

Science Conference Proceedings (OSTI)

Since 1962, all United States nuclear tests have been conducted underground. A consequence of this testing has been the deposition of large amounts of radioactive materials in the subsurface, sometimes in direct contact with groundwater. The majority of this testing occurred on the Nevada Test Site, but a limited number of experiments were conducted in other locations. One of these is the subject of this report, the Project Shoal Area (PSA), located about 50 km southeast of Fallon, Nevada. The Shoal test consisted of a 12-kiloton-yield nuclear detonation which occurred on October 26, 1963. Project Shoal was part of studies to enhance seismic detection of underground nuclear tests, in particular, in active earthquake areas. Characterization of groundwater contamination at the Project Shoal Area is being conducted by the US Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) with the State of Nevada Department of Environmental Protection and the US Department of Defense (DOD). This order prescribes a Corrective Action Strategy (Appendix VI), which, as applied to underground nuclear tests, involves preparing a Corrective Action Investigation Plan (CAIP), Corrective Action Decision Document (CADD), Corrective Action Plan, and Closure Report. The scope of the CAIP is flow and transport modeling to establish contaminant boundaries that are protective of human health and the environment. This interim report describes the current status of the flow and transport modeling for the PSA.

Pohll, G.; Chapman, J.; Hassan, A.; Papelis, C.; Andricevic, R.; Shirley, C.

1998-07-01T23:59:59.000Z

50

Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer  

Science Conference Proceedings (OSTI)

The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.

Winiarski, D.W.

1995-01-01T23:59:59.000Z

51

Laboratory Shuttle Bus Routes  

NLE Websites -- All DOE Office Websites (Extended Search)

Rear bike rack image Rear bike rack image The Laboratory provides shuttle bus services, contracted through MV Transportation Services. Routes run throughout its 200-acre facility, downtown Berkeley, local off-site facilities, UC Campus, Downtown Berkeley BART, and Rockridge BART stations. Shuttles offer free wifi onboard. Riders are asked to adhere to riding instructions. Active shuttle stops are marked with this sign: Bus sign image Shuttles run Monday through Friday, except Laboratory holidays. There is no weekend service. Special service for tours, group travel, etc. is available for a fee. All shuttles are equipped with Nextbus which uses GPS technology to enable riders to obtain real-time information on bus arrivals. Contact Bus Services at busservices@lbl.gov or 510-486-4165 to provide

52

Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications  

DOE Green Energy (OSTI)

The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

2011-06-01T23:59:59.000Z

53

Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications  

SciTech Connect

The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

2011-06-01T23:59:59.000Z

54

Downtown Minneapolis Bus Layover Study  

E-Print Network (OSTI)

;Express Bus Demand by Provider #12;2008 2030 Local 41 49 Express 72 125 Total 113 174 Maximum Layover? ·! What is our current demand for bus layover facilities? ·! How will demand increase as the region seeks;Local/ Limited (steady all day) Express (Peaked) Time of Day #of Buses Downtown Bus Layover Demand #12

Minnesota, University of

55

BLID sensor evaluation at a 500-kV substation: an interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of a buried-line intrusion detection (BLID) sensor is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensor are described.

1979-05-01T23:59:59.000Z

56

Perimeter sensor evaluation at a 500-kV substation. Interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of exterior perimeter intrusion sensors is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensors are described.

Griffith, R.D.

1978-08-01T23:59:59.000Z

57

SunLine Leads the Way in Demonstrating Hydrogen-Fueled Bus Technologies (Brochure)  

DOE Green Energy (OSTI)

This brochure describes SunLine Transit Agency's newest advanced technology fuel cell electric bus. SunLine is collaborating with the U.S. Department of Energy's Fuel Cell Technologies Program to evaluate the bus in revenue service. This bus represents the sixth generation of hydrogen-fueled buses that the agency has operated since 2000.

Not Available

2011-01-01T23:59:59.000Z

58

Interim Report on Methods for Systematic Evaluation of Emission Reduction Options: Meeting Risks and Climate Policies  

Science Conference Proceedings (OSTI)

This report introduces a fundamental framework to systematically assess the financial value of greenhouse gas reduction options, both individually and as part of a portfolio. It illustrates some of the variety of instruments that can be used to reduce or offset greenhouse gas emissions, highlights the importance of consistent evaluation, and provides a starting point for in-depth case study applications of the new framework.

2002-12-05T23:59:59.000Z

59

Solid waste burial grounds interim safety analysis  

SciTech Connect

This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

Saito, G.H.

1994-10-01T23:59:59.000Z

60

Bus Stop - Environment Connection: Do Characteristics of the Built Environment Correlate with Bus Stop Crime?  

E-Print Network (OSTI)

Correlate with Bus Stop Crime? Robin Liggett Anastasiawith Bus Stop Crime? Robin Liggett Anastasia Loukaitou-Correlate with Bus Stop Crime? Robin Liggett, Anestasia

Liggett, Robin S; Loukaitou-Sideris, Anastasia; Iseki, Hiroyuki

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Plug-In Hybrid Electric Vehicle Value Proposition Study: Interim Report: Phase I Scenario Evaluation  

DOE Green Energy (OSTI)

Plug-in hybrid electric vehicles (PHEVs) offer significant improvements in fuel economy, convenient low-cost recharging capabilities, potential environmental benefits, and decreased reliance on imported petroleum. However, the cost associated with new components (e.g., advanced batteries) to be introduced in these vehicles will likely result in a price premium to the consumer. This study aims to overcome this market barrier by identifying and evaluating value propositions that will increase the qualitative value and/or decrease the overall cost of ownership relative to the competing conventional vehicles and hybrid electric vehicles (HEVs) of 2030 During this initial phase of this study, business scenarios were developed based on economic advantages that either increase the consumer value or reduce the consumer cost of PHEVs to assure a sustainable market that can thrive without the aid of state and Federal incentives or subsidies. Once the characteristics of a thriving PHEV market have been defined for this timeframe, market introduction steps, such as supportive policies, regulations and temporary incentives, needed to reach this level of sustainability will be determined. PHEVs have gained interest over the past decade for several reasons, including their high fuel economy, convenient low-cost recharging capabilities, potential environmental benefits and reduced use of imported petroleum, potentially contributing to President Bush's goal of a 20% reduction in gasoline use in ten years, or 'Twenty in Ten'. PHEVs and energy storage from advanced batteries have also been suggested as enabling technologies to improve the reliability and efficiency of the electric power grid. However, PHEVs will likely cost significantly more to purchase than conventional or other hybrid electric vehicles (HEVs), in large part because of the cost of batteries. Despite the potential long-term savings to consumers and value to stakeholders, the initial cost of PHEVs presents a major market barrier to their widespread commercialization. The purpose of this project is to identify and evaluate value-added propositions for PHEVs that will help overcome this market barrier. Candidate value propositions for the initial case study were chosen to enhance consumer acceptance of PHEVs and/or compatibility with the grid. Potential benefits of such grid-connected vehicles include the ability to supply peak load or emergency power requirements of the grid, enabling utilities to size their generation capacity and contingency resources at levels below peak. Different models for vehicle/battery ownership, leasing, financing and operation, as well as the grid, communications, and vehicle infrastructure needed to support the proposed value-added functions were explored during Phase 1. Rigorous power system, vehicle, financial and emissions modeling were utilized to help identify the most promising value propositions and market niches to focus PHEV deployment initiatives.

Sikes, Karen R [ORNL; Markel, Lawrence C [ORNL; Hadley, Stanton W [ORNL; Hinds, Shaun [Sentech, Inc.; DeVault, Robert C [ORNL

2009-01-01T23:59:59.000Z

62

Interim findings of an evaluation of the U.S. EnergyGuide label  

SciTech Connect

The United States has labeled appliances with the EnergyGuide labels since 1980. Consensus is growing that this label is confusing to consumers and has little impact on purchase decisions. Many researchers have documented that alternative labeling approaches are effective in other countries. The authors comprehensively evaluated the U.S. appliance labeling program for white goods, heating and cooling equipment, and water heaters, with emphasis on products sold through retail outlets. To date, our research has included consumer focus groups and semi-structured interviews with various market actors to assess how best to communicate energy information. With consumers and retail sales staff, five graphical designs were tested a European-style, letter based graphic; an Australian-style star-based graphic; a speedometer-style graphic; a thermometer-style graphic; and the current U.S. style. With manufacturers and contractors, we did not directly test alternate designs. Instead, we asked their opinion of and experience with the current EnergyGuide labeling program.

Egan, Christine; Payne, Christopher T.; Thorne, Jennifer

2000-08-20T23:59:59.000Z

63

Plug-In Hybrid Electric Vehicle Value Proposition Study: Interim Report: Phase I Scenario Evaluation  

SciTech Connect

Plug-in hybrid electric vehicles (PHEVs) offer significant improvements in fuel economy, convenient low-cost recharging capabilities, potential environmental benefits, and decreased reliance on imported petroleum. However, the cost associated with new components (e.g., advanced batteries) to be introduced in these vehicles will likely result in a price premium to the consumer. This study aims to overcome this market barrier by identifying and evaluating value propositions that will increase the qualitative value and/or decrease the overall cost of ownership relative to the competing conventional vehicles and hybrid electric vehicles (HEVs) of 2030 During this initial phase of this study, business scenarios were developed based on economic advantages that either increase the consumer value or reduce the consumer cost of PHEVs to assure a sustainable market that can thrive without the aid of state and Federal incentives or subsidies. Once the characteristics of a thriving PHEV market have been defined for this timeframe, market introduction steps, such as supportive policies, regulations and temporary incentives, needed to reach this level of sustainability will be determined. PHEVs have gained interest over the past decade for several reasons, including their high fuel economy, convenient low-cost recharging capabilities, potential environmental benefits and reduced use of imported petroleum, potentially contributing to President Bush's goal of a 20% reduction in gasoline use in ten years, or 'Twenty in Ten'. PHEVs and energy storage from advanced batteries have also been suggested as enabling technologies to improve the reliability and efficiency of the electric power grid. However, PHEVs will likely cost significantly more to purchase than conventional or other hybrid electric vehicles (HEVs), in large part because of the cost of batteries. Despite the potential long-term savings to consumers and value to stakeholders, the initial cost of PHEVs presents a major market barrier to their widespread commercialization. The purpose of this project is to identify and evaluate value-added propositions for PHEVs that will help overcome this market barrier. Candidate value propositions for the initial case study were chosen to enhance consumer acceptance of PHEVs and/or compatibility with the grid. Potential benefits of such grid-connected vehicles include the ability to supply peak load or emergency power requirements of the grid, enabling utilities to size their generation capacity and contingency resources at levels below peak. Different models for vehicle/battery ownership, leasing, financing and operation, as well as the grid, communications, and vehicle infrastructure needed to support the proposed value-added functions were explored during Phase 1. Rigorous power system, vehicle, financial and emissions modeling were utilized to help identify the most promising value propositions and market niches to focus PHEV deployment initiatives.

Sikes, Karen R [ORNL; Markel, Lawrence C [ORNL; Hadley, Stanton W [ORNL; Hinds, Shaun [Sentech, Inc.; DeVault, Robert C [ORNL

2009-01-01T23:59:59.000Z

64

The Polylith Software Bus  

E-Print Network (OSTI)

We describe a system called Polylith that helps programmers prepare and interconnect mixed-language software components for execution in heterogeneous environments. Polylith's principal benefit is that programmers are free to implement functional requirements separately from their treatment of interfacing requirements; this means that once an application has been developed for use in one execution environment (such as a distributed network) it can be adapted for reuse in other environments (such as a shared-memory multiprocessor) by automatic techniques. This flexibility is provided without loss of performance. We accomplish this by creating a new run-time organization for software. An abstract decoupling agent, called the software bus, is introduced between the system components. Heterogeneity in language and architecture is accommodated since program units are prepared to interface directly to the bus, not to other program units. Programmers specify application structure in terms of ...

James M. Purtilo

1991-01-01T23:59:59.000Z

65

Interim report  

Science Conference Proceedings (OSTI)

This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

NONE

1985-06-01T23:59:59.000Z

66

Evaluation of a Current Source Active Power Filter to Reduce the DC Bus Capacitor in a Hybrid Electric Vehicle Traction Drive  

E-Print Network (OSTI)

Science Knoxville, TN, 37996, USA tolbert@utk.edu Abstract ­ In hybrid electric vehicles (HEV), a battery-source inverter, dc bus capacitor, Electric vehicle, Harmonic current, Hybrid electric vehicle. I. INTRODUCTION Electric Vehicle Traction Drive Shengnan Li Student Member, IEEE The University of Tennessee Department

Tolbert, Leon M.

67

Nuclear criticality safety evaluation of the passage of decontaminated salt solution from the ITP filters into tank 50H for interim storage  

SciTech Connect

This report assesses the nuclear criticality safety associated with the decontaminated salt solution after passing through the In-Tank Precipitation (ITP) filters, through the stripper columns and into Tank 50H for interim storage until transfer to the Saltstone facility. The criticality safety basis for the ITP process is documented. Criticality safety in the ITP filtrate has been analyzed under normal and process upset conditions. This report evaluates the potential for criticality due to the precipitation or crystallization of fissionable material from solution and an ITP process filter failure in which insoluble material carryover from salt dissolution is present. It is concluded that no single inadvertent error will cause criticality and that the process will remain subcritical under normal and credible abnormal conditions.

Hobbs, D.T.; Davis, J.R.

1994-05-27T23:59:59.000Z

68

Available Alternative Fuel School Bus Products--2004  

DOE Green Energy (OSTI)

This 4-page Clean Cities fact sheet provides a list of the currently available (and soon to be available) model year 2004 alternative fuel school bus and school bus engine products. It includes information from Blue Bird Corporation, Collins Bus Corporation, Corbeil Bus, Ford Motor Company, General Motors Corporation, Thomas Built Buses, Inc., Clean Air Partners, Cummins Westport, and Deere & Company.

Not Available

2004-04-01T23:59:59.000Z

69

COMPRESSED NATURAL GAS DEMONSTRATION BUS 7. Author{s)  

E-Print Network (OSTI)

A demonstration compressed natural gas (CNG) bus has been operating on The University of Texas at Austin shuttle system since 1992. This CNG vehicle, provided by the Blue Bird Company, was an opportunity for the University to evaluate the effectiveness of a CNG bus for shuttle operations. Three basic operating comparisons were made: 1) fuel consumption, 2) tire wear, and 3) vehicle performance. The bus was equipped with a data logger, Which was downloaded regularly, for trip reports. Tire wear was monitored regularly, and performance tests were conducted at the Natural Gas Vehicle Technology Center. Overall, the data suggest that fuel costs for the CNG bus are comparable to those for University diesel buses. This is a result of the lower fuel price for natural gas. Actual natural gas fuel consumption was higher for the CNG buses than for the diesel buses. Due to weight differences, tire wear was much less on the CNG buses. Finally, after installation of a closed-loop system, the CNG bus out-performed the diesel bus on acceleration, grade climbing ability, and speed.

Cheng-ming Wu; Ron Matthews; Mark Euritt

1994-01-01T23:59:59.000Z

70

Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet,...  

NLE Websites -- All DOE Office Websites (Extended Search)

has partnered with Proterra, a Colorado-based bus manufacturer, to bring its first fuel cell bus to the area. The bus design features a battery-dominant plug-in hybrid...

71

Evaluation of tuff as a medium for a nuclear waste repository: interim status report on the properties of tuff  

Science Conference Proceedings (OSTI)

This report is the second in a series of summary briefings to the National Academy of Science`s (NAS) Committee on Radioactive Waste Management dealing with feasibility of disposal of heat-producing radioactive waste in silicic tuff. The interim status of studies of tuff properties determined on samples obtained from Yucca Mountain and Rainier Mesa (G-tunnel) located on the Nevada Test Site (NTS) are discussed. In particular, progress is described on resolving issues identified during the first briefing to the NAS which include behavior of water in tuff when heated, the effect of the presence or absence of water and joints on the thermal/physical properties of tuff and the detailed/complex sorptive properties of highly altered and unaltered tuff. Initial correlations of thermal/physical and sorptive properties with the highly variable porosity and mineralogy are described. Three in-situ, at-depth field experiments, one nearly completed and two just getting underway are described. In particular, the current status of mineralogy and petrology, geochemistry, thermal and mechanical, radiation effects and water behavior studies are described. The goals and initial results of a Mine Design Working Group are discussed. Regional factors such as seismicity, volcanism and hydrology are not discussed.

Johnstone, J.K.; Wolfsberg, K. (eds.)

1980-07-01T23:59:59.000Z

72

EMAB Risk Subcommittee Interim Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FIRST INTERIM REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Incorporating Risk and Sustainability into Decision Making Submitted by the EMAB Risk Subcommittee December 3, 2012 Background: In December 2011, then Acting Assistant Secretary for Environmental Management David Huizenga, asked the Environmental Management Advisory Board (EMAB or Board) to establish a Risk Subcommittee. In February 2012, the Subcommittee's Work Plan was approved. Under the Work Plan, the purpose of the Subcommittee is to evaluate "risk-informed decision making," specifically whether the prioritization tool developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) for use at the Oak Ridge Reservation (Oak Ridge) is one that

73

DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work and challenges continued as it has been difficult to maintain operability of the shuttle bus due to fuel and component difficulties. In late June 2002, the pump head itself developed operational problems (loss of smooth function) leading to excessive stress on the magnetic coupling and excessive current draw to operate. A new pump head was installed on the system to alleviate this problem and the shuttle bus operated successfully on DME blends from 10-25 vol% on the shuttle bus loop until September 30, 2002. During the period of operation on the campus loop, the bus was pulled from service, operated at the PTI test track and real-time emissions measurements were obtained using an on-board emissions analyzer from Clean Air Technologies International, Inc. Particulate emissions reductions of 60% and 80% were observed at DME blend ratios of 12 vol.% and 25 vol.%, respectively, as the bus was operated over the Orange County driving cycle. Increases in NOx, CO and HC emissions were observed, however. In summary, the conversion of the shuttle bus was successfully accomplished, particulate emissions reductions were observed, but there were operational challenges in the field. Nonetheless, they were able to demonstrate reliable operation of the shuttle bus on DME-diesel blends.

Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

2003-04-01T23:59:59.000Z

74

Overview hazard analysis for the H2Fuel Bus Program  

DOE Green Energy (OSTI)

The H2Fuel Bus project is a joint development effort to produce a safe, near-zero emission, 32 passenger bus that is propelled by electric power with continuous on-board hydrogen powered battery recharging. A key initiative in the hydrogen bus development effort is a rigorous evaluation of operational safety. Westinghouse Savannah River Co., the prime contractor at the Department of Energy`s Savannah River Site, has developed a hazard analysis methodology designed to provide a systematic, comprehensive identification and evaluation of hazards. Although originally developed to support nuclear/chemical facility safety basis documentation, the SRS Methodology has widespread applicability to operations and/or systems that utilize hazardous materials and energy. This methodology was used to perform an overview hazard analysis for the H2Fuel Bus project to focus attention on those hypothetical circumstances that pose the greatest threat to the populace and property. The hazard analysis yields a listing of all known H2Fuel Bus hazards, postulated accident scenarios describing possible hazardous releases or conditions, an assessment of the scenarios in terms of frequency of occurrence and consequence, and binning in frequency-consequence space to assess the relative severity of postulated scenarios.

Hovis, G.L.

1996-06-18T23:59:59.000Z

75

Evaluation of Shear Strength Threshold of Concern for Retrieval of Interim-Stored K-Basin Sludge in the Hanford Site  

SciTech Connect

K-Basin sludge will be recovered into the Sludge Transport and Storage Containers (STSCs) and will be stored in the T Plant for interim storage (at least 10 years). Long-term sludge storage tests conducted by Pacific Northwest National Laboratory show that high uranium content K Basin sludge can self-cement and form a strong sludge with a bulk shear strength of up to 65 kPa. Some of this sludge has "paste" and "chunks" with shear strengths of approximately 3~5 kPa and 380 ~ 770 kPa, respectively. High uranium content sludge samples subjected to hydrothermal testing (e.g., 185°C, 10 h) have been observed to form agglomerates with a shear strength up to 170 kPa. After interim storage at T Plant, the sludge in the STSCs will be mobilized by water jets impinging the sludge. The objective of the evaluation was to determine the range of sludge shear strength for which there is high confidence that a water-jet retrieval system can mobilize stored K-Basin sludge from STSCs. The shear strength at which the sludge can be retrieved is defined as the "shear strength threshold of concern." If the sludge shear strength is greater than the value of the shear strength threshold of concern, a water-jet retrieval system will be unlikely to mobilize the sludge up to the container’s walls. The shear strength threshold of concern can be compared with the range of possible shear strengths of K-Basin stored sludge to determine if the current post interim-storage, water-jet retrieval method is adequate. Fourteen effective cleaning radius (ECR) models were reviewed, and their validity was examined by applying them to Hanford 241-SY-101 and 241-AZ-101 Tanks to reproduce the measured ECR produced by the mixer pumps. The validation test identified that the Powell-3 and Crowe-2 ECR models are more accurate than other ECR models reviewed. These ECR models were used to address a question as to whether the effective cleaning radius of a water jet is sufficient or if it can be readily expanded to cover the range of possible shear strengths. These results will assist CH2M HILL Plateau Remediation Company (CHPRC) to establish the technical basis of the feasibility of the sludge retrieval and storage plan and to develop an adequate water jet system to retrieve the stored K-Basin sludge in the STSCs. The STSCs are 2:1 elliptical-head vessels, 58 inches in diameter and 105 inches tall. Each STSC will contain 0.5 to 2.1 m3 of settled sludge with the specific loading dependent upon sludge type.

Onishi, Yasuo; Yokuda, Satoru T.; Schmidt, Andrew J.

2010-11-01T23:59:59.000Z

76

On Bus-Stop Crime  

E-Print Network (OSTI)

and Martin Wachs, “Crime in Public Transit Systems: AnOn Bus-Stop Crime B Y A N A S TA S I A L O U K A I T O U - Sas common settings for crime, pro v i d i n g cover for

Loukaitou-Sideris, Anastasia; Liggett, Robin

2000-01-01T23:59:59.000Z

77

Switching surge test results ehv substation bus configurations  

SciTech Connect

The industry has been actively engaged in, and has presented many results of, ehv switching surge test programs associated with transmission line designs. It would seem equally important that similar efforts be staged relative to ehv switching surge capabilities of the terminal equipment as it would normally be found in its variety of configurations. Toward this end, a series of switching surge test programs on a number of substation bus configurations was conducted. Particular emphasis was placed on the determination of switching surge characteristics of the air gaps found in ehv substation bus designs. The test data are presented with pertinent data evaluations in an attempt to provide a more refined basis for the application of final judgments to bus designs for 345, 500, and 750 kV substations.

Hertig, G.E.; Kelly, W.B.

1966-08-01T23:59:59.000Z

78

Electrical system architecture having high voltage bus  

DOE Patents (OSTI)

An electrical system architecture is disclosed. The architecture has a power source configured to generate a first power, and a first bus configured to receive the first power from the power source. The architecture also has a converter configured to receive the first power from the first bus and convert the first power to a second power, wherein a voltage of the second power is greater than a voltage of the first power, and a second bus configured to receive the second power from the converter. The architecture further has a power storage device configured to receive the second power from the second bus and deliver the second power to the second bus, a propulsion motor configured to receive the second power from the second bus, and an accessory motor configured to receive the second power from the second bus.

Hoff, Brian Douglas (East Peoria, IL); Akasam, Sivaprasad (Peoria, IL)

2011-03-22T23:59:59.000Z

79

PinBus Interface Design  

SciTech Connect

On behalf of the U.S. Department of Energy, PNNL has explored and expanded upon a simple control interface that might have merit for the inexpensive communication of smart grid operational objectives (demand response, for example) to small electric end-use devices and appliances. The approach relies on bi-directional communication via the electrical voltage states of from one to eight shared interconnection pins. The name PinBus has been suggested and adopted for the proposed interface protocol. The protocol is defined through the presentation of state diagrams and the pins’ functional definitions. Both simulations and laboratory demonstrations are being conducted to demonstrate the elegance and power of the suggested approach. PinBus supports a very high degree of interoperability across its interfaces, allowing innumerable pairings of devices and communication protocols and supporting the practice of practically any smart grid use case.

Hammerstrom, Donald J.; Adgerson, Jewel D.; Sastry, Chellury; Pratt, Richard M.; Pratt, Robert G.

2009-12-30T23:59:59.000Z

80

Enterprise Service Bus Implementation Profile  

Science Conference Proceedings (OSTI)

The purpose of this report is to define an implementation profile for International Electrotechnical Commission (IEC) 61968 using technologies commonly found on an Enterprise Service Bus (ESB). More specifically, this document describes how message payloads defined by parts 3 through 9 of IEC 61968 are conveyed using Web Services and the Java Message Service (JMS). The goal is to provide details that are sufficient to enable implementations of IEC 61968 to be interoperable.

2009-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Evaluation of higher distribution and/or utilization voltages. First interim report (December 1978): literature search and problem definition  

Science Conference Proceedings (OSTI)

A literature search has been conducted on the economics and technical problems associated with the use of higher voltages in both the primary distribution and secondary utilization systems. After a literature review and evaluation, an assessment of the state-of-the-art with regard to high voltage has been made and is presented for the primary and secondary distribution systems, end use elements, and economics and system analysis or optimization. An annotated bibliography is provided for each of the three categories. A comprehensive list of potential advantages and disadvantages of higher primary distribution and utilization voltages has also been prepared and is presented.

Not Available

1981-04-01T23:59:59.000Z

82

Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants  

SciTech Connect

The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

Mays, Gary T [ORNL; Belles, Randy [ORNL; Cetiner, Mustafa Sacit [ORNL; Howard, Rob L [ORNL; Liu, Cheng [ORNL; Mueller, Don [ORNL; Omitaomu, Olufemi A [ORNL; Peterson, Steven K [ORNL; Scaglione, John M [ORNL

2012-06-01T23:59:59.000Z

83

Evaluation of interim and final waste forms for the newly generated liquid low-level waste flowsheet  

SciTech Connect

The purpose of this review is to evaluate the final forms that have been proposed for radioactive-containing solid wastes and to determine their application to the solid wastes that will result from the treatment of newly generated liquid low-level waste (NGLLLW) and Melton Valley Storage Tank (MVST) supernate at the Oak Ridge National Laboratory (ORNL). Since cesium and strontium are the predominant radionuclides in NGLLLW and MVST supernate, this review is focused on the stabilization and solidification of solid wastes containing these radionuclides in cement, glass, and polymeric materials-the principal waste forms that have been tested with these types of wastes. Several studies have shown that both cesium and strontium are leached by distilled water from solidified cement, although the leachabilities of cesium are generally higher than those of strontium under similar conditions. The situation is exacerbated by the presence of sulfates in the solution, as manifested by cracking of the grout. Additives such as bentonite, blast-furnace slag, fly ash, montmorillonite, pottery clay, silica, and zeolites generally decrease the cesium and strontium release rates. Longer cement curing times (>28 d) and high ionic strengths of the leachates, such as those that occur in seawater, also decrease the leach rates of these radionuclides. Lower cesium leach rates are observed from vitrified wastes than from grout waste forms. However, significant quantities of cesium are volatilized due to the elevated temperatures required to vitrify the waste. Hence, vitrification will generally require the use of cleanup systems for the off-gases to prevent their release into the atmosphere.

Abotsi, G.M.K. [Clark Atlanta Univ., GA (United States); Bostick, D.T.; Beck, D.E. [Oak Ridge National Lab., TN (United States)] [and others

1996-05-01T23:59:59.000Z

84

Joint Fuel Cell Bus Workshop Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

equipment is heavy and costly * Slow response time of the fuel cell adversely affects regenerative energy recovery potential and efficiency Barriers to full fuel cell bus...

85

NREL: Technology Transfer - Renewable Hydrogen Bus Teaches ...  

The bus filled up at NREL’s on-site hydrogen fueling station, which dispenses hydrogen made with wind and solar energy.

86

A comprehensive study on IEC61850 process bus architecture and spit bus based differential protection  

Science Conference Proceedings (OSTI)

IEC61850 communication standard for digital substation automation creates a new way to think about conventional protection scheme and configuration of substation. The presence of communication link in process bus makes a revolutionary change for future ... Keywords: IEC61850, bus fault detection unit (BFDU), nonconventional instrumental transformer (NCIT), process bus, sampled measured value (SMV)

Mojaharul Islam; Hong-Hee Lee

2011-08-01T23:59:59.000Z

87

Alternative Fuel School Bus Information Resources  

DOE Green Energy (OSTI)

This 4-page Clean Cities fact sheet provides a list of important resources for learning more about alternative fuels in school buses. It includes information regarding Alternative Fuel School Bus Manufacturers, Alternative Fuel HD Engine Manufacturers, Alternative Fuel School Bus Operators, and Key Web Resources for Alternative Fuels.

Not Available

2004-04-01T23:59:59.000Z

88

Interprocessor bus switching system for simultaneous communication in plural bus parallel processing system  

DOE Patents (OSTI)

A bus switching apparatus and method for multiple processor computer systems comprises a plurality of bus switches interconnected by branch buses. Each processor or other module of the system is connected to a spigot of a bus switch. Each bus switch also serves as part of a backplane of a modular crate hardware package. A processor initiates communication with another processor by identifying that other processor. The bus switch to which the initiating processor is connected identifies and secures, if possible, a path to that other processor, either directly or via one or more other bus switches which operate similarly. If a particular desired path through a given bus switch is not available to be used, an alternate path is considered, identified and secured. 11 figures.

Atac, R.; Fischler, M.S.; Husby, D.E.

1991-01-15T23:59:59.000Z

89

Laboratory Shuttle Bus Routes: Instructions for Riders  

NLE Websites -- All DOE Office Websites (Extended Search)

Instructions for Riders Instructions for Riders Shuttle stops are marked with this sign: Bus sign image Tips for riders: When you see a shuttle bus approaching WAVE AT THE DRIVER so the driver knows you want to board the bus For safety reasons, shuttle bus drivers can only pick-up and drop-off passengers at designated stops. Shuttle services are for Berkeley Lab employee and guest use only. All riders are required to show ID when boarding off-site buses. Acceptable ID's are: LBNL badge, UC Berkeley student and faculty ID badge, DOE badge, or UCOP badge. Guests are required to present a visitor bus pass, email, or permission from Lab host, written on official letterhead. See Site Access for more information. As you board, tell the driver the building number of your destination. The driver will be able to assist you with directions.

90

Shuttle Bus and Couriers | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Shuttle Bus and Couriers Shuttle Bus and Couriers Shuttle Bus and Couriers Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is inappropriate and against the

91

Laboratory Shuttle Bus Routes: Instructions for Bicyclists  

NLE Websites -- All DOE Office Websites (Extended Search)

Instructions for Bicyclists Instructions for Bicyclists Front bike rack image Rear bike rack image Front bike rack Rear bike rack Bicyclists are required to wear helmets while riding at the Berkeley Lab. LBNL buses are equipped with bicycle racks in the front and rear of the bus. Use bicycle rack at your own risk. Berkeley Lab does not assume liability for damage to your bicycle. If you experience difficulties, or notice the bicycle rack is not working properly, please notify the bus operator and/or contact the bus supervisor at 486-4165 or email busservices@lbl.gov and/or post your comments with specific information on the Operations Suggestion box. Loading a bicycle on the bus: Prepare your bicycle for loading by: removing water bottles, pumps and other loose items that could fall off while the bus is in motion.

92

Orion Bus Industries | Open Energy Information  

Open Energy Info (EERE)

Bus Industries Bus Industries Jump to: navigation, search Name Orion Bus Industries Place Ontario, Canada Information About Partnership with NREL Partnership with NREL Yes Partnership Type Other Relationship Partnering Center within NREL Transportation Technologies and Systems Partnership Year 2001 Link to project description http://www.nrel.gov/news/press/2002/3002_hybird_buses.html LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! Orion Bus Industries is a company located in Ontario, Canada. References Retrieved from "http://en.openei.org/w/index.php?title=Orion_Bus_Industries&oldid=381704" Categories: Clean Energy Organizations Companies Organizations What links here Related changes Special pages Printable version Permanent link Browse properties

93

Dept. of Energy/Dept. of Transportation Gas Turbine Transit Bus Demonstration Program: program plan  

SciTech Connect

This document is the program plan for a cooperative project of the Urban Mass Transportation Administration (UMTA) of the Department of Transportation and the Division of Transportation Energy Conservation (TEC) of the Department of Energy to test and evaluate the use of gas-turbine engines in transit buses. UMTA is responsible for furnishing buses from UMTA grantees, technical direction for bus/engine integration, and coordination of operational use of buses in selected cities. TEC is responsible for providing gas turbines, data acquisition/reduction services, and management for the complete project. The project will be carried out in three phases. In Phase I, prototype turbine engines will be used. One turbine-powered bus and diesel-powered bus will be tested at a test facility to obtain baseline data. Five turbine-powered buses will be evaluated in revenue service in one city. In Phase II, preproduction turbine engines will be used. One turbine-powered bus and diesel-powered bus will be baseline tested and ten turbine-powered buses will be evaluated in two cities. In Phase III, production gas turbine engines will be used. Only the turbine-powered bus will run baseline tests in this phase. Ten turbine-powered buses will be evaluated in two cities.

1978-04-01T23:59:59.000Z

94

Interim storage study report  

SciTech Connect

High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

Rawlins, J.K.

1998-02-01T23:59:59.000Z

95

Alternative Fuels Data Center: School Bus Idle Reduction Regulations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Regulations to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Regulations on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Regulations on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Regulations on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Regulations on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Regulations on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Regulations on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Regulations School bus drivers must turn off bus engines as soon as possible at loading

96

Alternative Fuels Data Center: School Bus Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Requirement School bus operators must turn off the bus engine immediately after

97

Alternative Fuels Data Center: Clean School Bus USA  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus USA School Bus USA to someone by E-mail Share Alternative Fuels Data Center: Clean School Bus USA on Facebook Tweet about Alternative Fuels Data Center: Clean School Bus USA on Twitter Bookmark Alternative Fuels Data Center: Clean School Bus USA on Google Bookmark Alternative Fuels Data Center: Clean School Bus USA on Delicious Rank Alternative Fuels Data Center: Clean School Bus USA on Digg Find More places to share Alternative Fuels Data Center: Clean School Bus USA on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean School Bus USA Clean School Bus USA is a public-private partnership that focuses on reducing children's exposure to harmful diesel exhaust by limiting school bus idling, implementing pollution reduction technologies, improving route

98

Interim readiness plan  

SciTech Connect

This report provides rough designs and costs for 3 payloads which can be built on a relatively fast time scale. With these, Lawrence Radiation Laboratory (LRL) could measure neutrons and X-rays from high altitude shots. No measurements of soft X-rays (less than or approximately equal to 5 kev), hard X- rays (greater than or approximately equal to 60 kev), or gamma rays would be made. Plans could be made to fly the Simplex payload as part of the spring Lapwing exercise. Some interim capability exists from other sources which might compliment the above measurements. Sandia has developed a mylar sail sampler which could be used for debris experiments. There is a LASL/Sandia scan converter which could be fielded to make fast time-history measurements of the X-ray or gamma ray pulse. Interval time could be measured with a ground based EMP detector. The LRL cost of this interim rocket program is approximately 5 man years of effort and about $140,000 of major procurement. Sandia would need approximately $450,000 to stockpile payloads. I believe the necessary rockets are already stockpiled but some work on the ranges might be required. For example, more launchers are needed on Johnston Atoll. All this money and effort would be expended in FY- 1970 and these rocket experiments would be ready (`on the shelf` or close) by June 1970.

Seward, F. D.

1969-03-01T23:59:59.000Z

99

PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION  

SciTech Connect

This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

CONRAD EA

2008-08-12T23:59:59.000Z

100

Ultralight Stainless Steel Urban Bus Concept  

DOE Green Energy (OSTI)

While stainless steel buses are certainly not new, this study reveals opportunities for substantial improvements in structural performance.The objective of this project was to investigate the mass saving potential of ultra-high strength stainless steel as applied to the structure of a full size urban transit bus.The resulting design for a low floor,hybrid bus has an empty weight less than half that of a conventional transit bus.The reduced curb weight allows for a greater payload,without exceeding legal axle limits. A combination of finite element modeling and dynamic testing of scale models was used to predict structural performance.

J. Bruce Emmons; Leonard J. Blessing

2001-05-14T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Alternative Fuels Data Center: School Bus Idle Reduction Policy  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Policy to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Policy on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Policy on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Policy on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Policy on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Policy on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Policy on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Policy School bus drivers or drivers of other vehicles that the school district

102

Fuel Cell Bus Takes a Starring Role in the Burbank Bus Fleet  

Fuel Cell Technologies Publication and Product Library (EERE)

This fact sheet reports on the City of Burbank, California's fuel cell bus demonstration project and the U.S. Department of Energy's involvement.

103

Overview of Fuel Cell Electric Bus Development  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview of Fuel Cell Overview of Fuel Cell Electric Bus Development Leslie Eudy, National Renewable Energy Laboratory September 12, 2013 2 Why Fuel Cells for Transit Buses? * Reduce transit bus emissions * Improve fuel efficiency * Improve vehicle performance * Consumer Acceptance * Transit industry is excellent test-bed for new technologies o Centrally fueled and maintained o Fixed routes with urban stop-go duty cycle o Professional operators and mechanics o Federal Capital Funding Support o High Visibility & High Impact 3 FCEB Development Timeline since 2000 California Air Resources Board Transit Rule Early demonstrations of single prototypes DOE begins funding NREL technology validation for FCEBs First multiple bus fleet demonstrations in California FTA initiates National Fuel Cell Bus Program and

104

Building Energy Software Tools Directory: BUS++  

NLE Websites -- All DOE Office Websites (Extended Search)

BUS++ BUS++ New generation platform for building energy, ventilation, noise level and indoor air quality simulations. A network assumption is adopted, and BUS++ allows both steady-state and dynamic simulations on a desired level of accuracy. BUS++ includes modern solution routines and has passed the most commonly used rigorous air flow and heat transfer test cases. However, only a limited number of special applications are completed. Keywords energy performance, ventilation, air flow, indoor air quality, noise level Validation/Testing N/A Expertise Required Special expertise needed for utilizing all potential calculation features. Common knowledge of building components needed for using special applications with graphical user interfaces. Users 20 users in VTT Building Technology and other companies in Finland.

105

Alternative Fuels Data Center: Low Emissions School Bus Grants  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low Emissions School Low Emissions School Bus Grants to someone by E-mail Share Alternative Fuels Data Center: Low Emissions School Bus Grants on Facebook Tweet about Alternative Fuels Data Center: Low Emissions School Bus Grants on Twitter Bookmark Alternative Fuels Data Center: Low Emissions School Bus Grants on Google Bookmark Alternative Fuels Data Center: Low Emissions School Bus Grants on Delicious Rank Alternative Fuels Data Center: Low Emissions School Bus Grants on Digg Find More places to share Alternative Fuels Data Center: Low Emissions School Bus Grants on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low Emissions School Bus Grants The Lower-Emission School Bus Program (Program) provides grant funding for

106

Clean Cities: Natural Gas Transit and School Bus Users Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Transit and School Bus Transit and School Bus Users Group to someone by E-mail Share Clean Cities: Natural Gas Transit and School Bus Users Group on Facebook Tweet about Clean Cities: Natural Gas Transit and School Bus Users Group on Twitter Bookmark Clean Cities: Natural Gas Transit and School Bus Users Group on Google Bookmark Clean Cities: Natural Gas Transit and School Bus Users Group on Delicious Rank Clean Cities: Natural Gas Transit and School Bus Users Group on Digg Find More places to share Clean Cities: Natural Gas Transit and School Bus Users Group on AddThis.com... Goals & Accomplishments Partnerships National Clean Fleets Partnership National Parks Initiative Electric Vehicle Infrastructure Training Program Advanced Vehicle Technology Competitions Natural Gas Transit & School Bus Users Group

107

Alternative Fuels Data Center: School Bus Retrofit Reimbursement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Retrofit School Bus Retrofit Reimbursement to someone by E-mail Share Alternative Fuels Data Center: School Bus Retrofit Reimbursement on Facebook Tweet about Alternative Fuels Data Center: School Bus Retrofit Reimbursement on Twitter Bookmark Alternative Fuels Data Center: School Bus Retrofit Reimbursement on Google Bookmark Alternative Fuels Data Center: School Bus Retrofit Reimbursement on Delicious Rank Alternative Fuels Data Center: School Bus Retrofit Reimbursement on Digg Find More places to share Alternative Fuels Data Center: School Bus Retrofit Reimbursement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Retrofit Reimbursement The Illinois Department of Education will reimburse any qualifying school

108

Alternative Fuels Data Center: Alternative Fuel School Bus Conversion  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Conversion Research to someone by E-mail School Bus Conversion Research to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel School Bus Conversion Research on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel School Bus Conversion Research on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Conversion Research on Google Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Conversion Research on Delicious Rank Alternative Fuels Data Center: Alternative Fuel School Bus Conversion Research on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel School Bus Conversion Research on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel School Bus Conversion Research

109

Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Zero Emissions Bus Zero Emissions Bus Implementation Plan to someone by E-mail Share Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan on Facebook Tweet about Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan on Twitter Bookmark Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan on Google Bookmark Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan on Delicious Rank Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan on Digg Find More places to share Alternative Fuels Data Center: Zero Emissions Bus Implementation Plan on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Zero Emissions Bus Implementation Plan As part of a state effort to identify strategies to expand the availability

110

Alternative Fuels Data Center: Clean School Bus Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Clean School Bus Clean School Bus Requirements to someone by E-mail Share Alternative Fuels Data Center: Clean School Bus Requirements on Facebook Tweet about Alternative Fuels Data Center: Clean School Bus Requirements on Twitter Bookmark Alternative Fuels Data Center: Clean School Bus Requirements on Google Bookmark Alternative Fuels Data Center: Clean School Bus Requirements on Delicious Rank Alternative Fuels Data Center: Clean School Bus Requirements on Digg Find More places to share Alternative Fuels Data Center: Clean School Bus Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean School Bus Requirements Full-size school buses equipped with an engine from Model Year (MY) 1993 or older may not be used to transport school children in Rhode Island.

111

Alternative Fuels Data Center: School Bus Retrofit Grant Program  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Retrofit School Bus Retrofit Grant Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Retrofit Grant Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Retrofit Grant Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Retrofit Grant Program on Google Bookmark Alternative Fuels Data Center: School Bus Retrofit Grant Program on Delicious Rank Alternative Fuels Data Center: School Bus Retrofit Grant Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Retrofit Grant Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Retrofit Grant Program The Ohio Environmental Protection Agency (EPA) administers the Clean Diesel

112

Alternative Fuels Data Center: School Bus Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Requirement The Mississippi State Department of Education requires public school

113

Alternative Fuels Data Center: School Bus Pilot Program  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Pilot School Bus Pilot Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Pilot Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Pilot Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Pilot Program on Google Bookmark Alternative Fuels Data Center: School Bus Pilot Program on Delicious Rank Alternative Fuels Data Center: School Bus Pilot Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Pilot Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Pilot Program The Vermont Department of Motor Vehicles will approve up to three participants for a pilot program to operate Type II school buses that are

114

Alternative Fuels Data Center: School Bus Emissions Reduction Funding  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Emissions School Bus Emissions Reduction Funding to someone by E-mail Share Alternative Fuels Data Center: School Bus Emissions Reduction Funding on Facebook Tweet about Alternative Fuels Data Center: School Bus Emissions Reduction Funding on Twitter Bookmark Alternative Fuels Data Center: School Bus Emissions Reduction Funding on Google Bookmark Alternative Fuels Data Center: School Bus Emissions Reduction Funding on Delicious Rank Alternative Fuels Data Center: School Bus Emissions Reduction Funding on Digg Find More places to share Alternative Fuels Data Center: School Bus Emissions Reduction Funding on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Emissions Reduction Funding The New York State Energy Research and Development Authority (NYSERDA)

115

Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

National Fuel Cell Bus National Fuel Cell Bus Program (NFCBP) to someone by E-mail Share Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP) on Facebook Tweet about Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP) on Twitter Bookmark Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP) on Google Bookmark Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP) on Delicious Rank Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP) on Digg Find More places to share Alternative Fuels Data Center: National Fuel Cell Bus Program (NFCBP) on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type National Fuel Cell Bus Program (NFCBP) The goal of the NFCBP is to facilitate the development of commercially

116

Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Pilot Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Pilot Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Pilot Program As part of the Children's Environmental Health Project, the Arizona

117

Alternative Fuels Data Center: School Bus Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Idle Reduction Requirement All local boards of education in North Carolina have adopted idle reduction

118

Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites: Final report  

Science Conference Proceedings (OSTI)

This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs.

Klein, A.R.; Bloom, C.W.

1989-07-01T23:59:59.000Z

119

EMCS Retrofit Analysis - Interim Report  

SciTech Connect

This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type found in the Philip Burton Federal Building.

Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

1999-03-01T23:59:59.000Z

120

DOE HQ Shuttle Bus Route and Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shuttle Bus Route and Schedule Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Alternative Fuels Data Center: Alternative Fuel School Bus Incentive  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel School Bus Incentive to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel School Bus Incentive on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel School Bus Incentive on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Incentive on Google Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Incentive on Delicious Rank Alternative Fuels Data Center: Alternative Fuel School Bus Incentive on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel School Bus Incentive on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel School Bus Incentive Any county that uses compressed natural gas (CNG) for the operation of any

122

Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Joint Fuel Cell Bus Joint Fuel Cell Bus Workshop to someone by E-mail Share Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop on Facebook Tweet about Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop on Twitter Bookmark Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop on Google Bookmark Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop on Delicious Rank Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop on Digg Find More places to share Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop on AddThis.com... Publications Program Publications Technical Publications Educational Publications Newsletter Program Presentations Multimedia Conferences & Meetings Annual Merit Review Proceedings Workshop & Meeting Proceedings Webinars

123

Alternative Fuels Data Center: Alternative Fuel School Bus Regulations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel School Bus Regulations to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel School Bus Regulations on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel School Bus Regulations on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Regulations on Google Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Regulations on Delicious Rank Alternative Fuels Data Center: Alternative Fuel School Bus Regulations on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel School Bus Regulations on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel School Bus Regulations The Virginia Board of Education may not unreasonably limit the authority of

124

Alternative Fuels Data Center: School Bus Emissions Reduction  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Emissions Reduction to someone by E-mail Share Alternative Fuels Data Center: School Bus Emissions Reduction on Facebook Tweet about Alternative Fuels Data Center: School Bus Emissions Reduction on Twitter Bookmark Alternative Fuels Data Center: School Bus Emissions Reduction on Google Bookmark Alternative Fuels Data Center: School Bus Emissions Reduction on Delicious Rank Alternative Fuels Data Center: School Bus Emissions Reduction on Digg Find More places to share Alternative Fuels Data Center: School Bus Emissions Reduction on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Emissions Reduction Each full-sized school bus with a Model Year (MY) 1994 or newer engine that transports children in the state must be equipped with specific emissions

125

Clean Cities: Natural Gas Transit (and School Bus) Users Group...  

NLE Websites -- All DOE Office Websites (Extended Search)

Natural Gas Transit (and School Bus) Users Group Meeting Archives to someone by E-mail Share Clean Cities: Natural Gas Transit (and School Bus) Users Group Meeting Archives on...

126

Alternative Fuels Data Center: School Bus Retrofit Program  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Retrofit Retrofit Program to someone by E-mail Share Alternative Fuels Data Center: School Bus Retrofit Program on Facebook Tweet about Alternative Fuels Data Center: School Bus Retrofit Program on Twitter Bookmark Alternative Fuels Data Center: School Bus Retrofit Program on Google Bookmark Alternative Fuels Data Center: School Bus Retrofit Program on Delicious Rank Alternative Fuels Data Center: School Bus Retrofit Program on Digg Find More places to share Alternative Fuels Data Center: School Bus Retrofit Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type School Bus Retrofit Program The goals of the Connecticut Clean School Bus Program are to: 1) establish grants for municipalities and local and regional school boards to reimburse

127

Alternative Fuels Data Center: School Bus Idle Reduction Strategies  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

School Bus Idle School Bus Idle Reduction Strategies to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Digg Find More places to share Alternative Fuels Data Center: School Bus Idle Reduction Strategies on AddThis.com... More in this section... Idle Reduction Benefits & Considerations Heavy-Duty Vehicles Medium-Duty Vehicles Light-Duty Vehicles School Buses Laws & Incentives Research & Development

128

3 One-Line Diagram and Bus/Branch Model  

E-Print Network (OSTI)

One-line diagram and bus/branch model Ohm’s law Losses Kirchoff’s law Power flow calculations (different model idealizations) Reference bus Power System & LMP Fundamentals – WEM 301 © 2008 ISO New England Inc.

Eugene Litvinov Director; Marginal Loss Pricing; Market System; Major Components; Line Line; Line Line

2008-01-01T23:59:59.000Z

129

A review of proposed Glen Canyon Dam interim operating criteria  

DOE Green Energy (OSTI)

Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

1992-04-01T23:59:59.000Z

130

SunLine Tests HHICE Bus in Desert Climate  

DOE Green Energy (OSTI)

Fact sheet describes the demonstration of a hybrid hydrogen internal combustion engine (HHICE) bus at SunLine Transit Agency.

Not Available

2006-10-01T23:59:59.000Z

131

July 4, 1997 The Stanford InfoBus and  

E-Print Network (OSTI)

July 4, 1997 1 of 30 The Stanford InfoBus and Its Service Layers Augmenting the Internet Project Computer Science Department Stanford University, CA 94305 The Stanford InfoBus is a prototype service layers pro­ vided by the Stanford InfoBus: protocols for managing items and collections (DLIOP

Gravano, Luis

132

Immobilized High Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report 2nd Generation Implementing Architecture  

SciTech Connect

Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document.

CALMUS, R.B.

2000-09-14T23:59:59.000Z

133

Energy DataBus (Fact Sheet)  

SciTech Connect

NREL has developed the Energy DataBus, an open-sourced software that collects massive amounts of energy-related data at second-to-second intervals; stores it in a massive, scalable database; and turns it into useful information.

2013-07-01T23:59:59.000Z

134

Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low Emission or Low Emission or Alternative Fuel Bus Acquisition Requirement to someone by E-mail Share Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus Acquisition Requirement on Facebook Tweet about Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus Acquisition Requirement on Twitter Bookmark Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus Acquisition Requirement on Google Bookmark Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus Acquisition Requirement on Delicious Rank Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus Acquisition Requirement on Digg Find More places to share Alternative Fuels Data Center: Low Emission or Alternative Fuel Bus Acquisition Requirement on AddThis.com...

135

2010 Interim Laws and Regulations Pub 15  

Science Conference Proceedings (OSTI)

... offer an opportunity for the creation and implementation ... CWMA Interim Meeting, an energy company representative ... floor and believes their job is to ...

2013-07-23T23:59:59.000Z

136

National Source Tracking System & Interim Inventory  

National Nuclear Security Administration (NNSA)

for rule and placed requirements on system 3 Approach * Two phase - Interim inventory now provides database on sources - short term solution; gathered valuable data to...

137

National Source Tracking System & Interim Inventory  

National Nuclear Security Administration (NNSA)

other Federal agencies, States and internationally 3 Approach * Two phase - Interim inventory now provides database on NRC and Agreement State sources - short term solution;...

138

SG Network System Requirements Specification- Interim Release...  

NLE Websites -- All DOE Office Websites (Extended Search)

Specification- Interim Release 3 This document has been created to support NIST Smart Grid Interoperability Priority Action Plans (PAP) 1 & 2 and provide Utilities,...

139

90-day Interim Report on Shale Gas Production - Secretary of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Report on Shale Gas Production - Secretary of Energy Advisory Board 90-day Interim Report on Shale Gas Production - Secretary of Energy Advisory Board The Shale Gas...

140

Characterizing the Formation of Secondary Organic Aerosols-Interim...  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterizing the Formation of Secondary Organic Aerosols-Interim Report. Title Characterizing the Formation of Secondary Organic Aerosols-Interim Report. Publication Type Report...

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Substation Bus Ampacity Uprating: Feasibility Study  

Science Conference Proceedings (OSTI)

The continuous increase in demand for electric power has pushed some of the components in the Con Edison system to their design limits. These limits, established in the past, were often selected with general and conservative assumptions. Consequently, Con Edison requested the Electric Power Research Institute (EPRI) to investigate the possibility of raising the rating of their 3,000A substation bus to a higher value.The first step in the investigation was to conduct a feasibility study ...

2013-04-24T23:59:59.000Z

142

Vibration Monitoring and Analysis Program Development: Interim Guideline  

Science Conference Proceedings (OSTI)

This report has been prepared by an EPRI team and will serve as an interim guideline to assist the member utilities in the further improvement of maintenance processes by presenting, in detail, the key elements that should be included in a well-organized vibration monitoring and analysis program, as well as conducting comprehensive vibration program evaluations. This report uses the EPRI Monitoring and Diagnostics Center's "Spider Chart" approach to depict graphic representation of the vibration monitori...

2004-12-22T23:59:59.000Z

143

Big Green Bus: A Vehicle for Change | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Bus: A Vehicle for Change Green Bus: A Vehicle for Change Big Green Bus: A Vehicle for Change July 1, 2010 - 3:35pm Addthis The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | Joshua DeLung Twelve Dartmouth College students stopped at the U.S. Department of Energy Monday in a Big Green Bus, a 1989 MCI coach with an engine modified to run on waste vegetable oil. The students' goals are to promote alternative fuels and sustainable living with the slogan "Vehicle for Change" on this sixth-annual cross-country educational tour.

144

Fuel Cell Technologies Office: Joint Fuel Cell Bus Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Fuel Cell Bus Workshop Fuel Cell Bus Workshop The U.S. Department of Energy (DOE) and the U.S. Department of Transportation (DOT) held a Fuel Cell Bus Workshop on June 7, 2010 in Washington, D.C. in conjunction with the DOE Hydrogen and Fuel Cell Program Annual Merit Review. The workshop plenary and breakout session brought together technical experts from industry, end users, academia, DOE national laboratories, and other government agencies to address the status and technology needs of fuel cell powered buses. Meeting Summary Joint Fuel Cell Bus Workshop Summary Report Presentations Fuel Cell Bus Workshop Overview & Purpose, Dimitrios Papageorgopoulos, DOE Users Perspective on Advanced Fuel Cell Bus Technology, Nico Bouwkamp, CaFCP and Leslie Eudy, NREL Progress and Challenges for PEM Transit Fleet Applications, Tom Madden, UTC Power, LLC

145

NREL: Energy Analysis - The Energy DataBus  

NLE Websites -- All DOE Office Websites (Extended Search)

Bookmark and Share Bookmark and Share The Energy DataBus Register for a Demo Screen capture of the Energy DataBus's dashboards. Register for free download and install at your organization. As part of its ongoing mission to advance renewable energy and energy efficiency technologies, the National Renewable Energy Laboratory (NREL) has created the Energy DataBus-a system for organizations to store and process their energy data (or any time-series data). This is a special system that allows NREL to conduct energy informatics (EI) research and development, while delivering this research to the industry in the form of plug-ins to DataBus. Organizations that have DataBus can use these plug-ins for their own energy data research. DataBus is part of NREL's portfolio of EI projects and was developed to be

146

Bus Rapid Transit Planning Guide | Open Energy Information  

Open Energy Info (EERE)

Bus Rapid Transit Planning Guide Bus Rapid Transit Planning Guide Jump to: navigation, search Tool Summary Name: Bus Rapid Transit Planning Guide Agency/Company /Organization: Institute for Transportation & Development Policy Focus Area: Public Transit & Infrastructure Topics: Best Practices Resource Type: Reports, Journal Articles, & Tools Website: www.itdp.org/microsites/bus-rapid-transit-planning-guide/ The Bus Rapid Transit Planning Guide is the most comprehensive resource for planning a bus rapid transit (BRT) system, beginning with project preparation all the way through to implementation. How to Use This Tool This tool is most helpful when using these strategies: Improve - Enhance infrastructure & policies Learn more about the avoid, shift, improve framework for limiting air

147

Big Green Bus: A Vehicle for Change | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Big Green Bus: A Vehicle for Change Big Green Bus: A Vehicle for Change Big Green Bus: A Vehicle for Change July 1, 2010 - 3:35pm Addthis The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | Joshua DeLung Twelve Dartmouth College students stopped at the U.S. Department of Energy Monday in a Big Green Bus, a 1989 MCI coach with an engine modified to run on waste vegetable oil. The students' goals are to promote alternative fuels and sustainable living with the slogan "Vehicle for

148

High level waste interim storge architecture selection - decision report  

SciTech Connect

The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities (RL 1996a). This plan contains a two-phased approach. Phase I is a proof-of-principle/connnercial demonstration- scale effort and Phase II is a fiill-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE fumished. The high-level waste (BLW) interim storage options, or alternative architectures, were identified and evaluated to provide the framework from which to select the most viable method of Phase I BLW interim storage (Calmus 1996). This evaluation, hereafter referred to as the Alternative Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based on evaluation results, preliminary architectures and path forward reconunendations were provided for consideration in the architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on TSEP-07,Decision Management Procedure (WHC 1995). The established decision process entailed a Decision Board, consisting of Westinghouse Hanford Company (VY`HC) management staff, and included appointment of a VTHC Decision Maker. The Alternative Architecture Evaluation results and preliminary recommendations were presented to the Decision Board members for their consideration in the decision-making process. The Alternative Architecture Evaluation was prepared and issued before issuance of @C-IP- 123 1, Alternatives Generation and Analysis Procedure (WI-IC 1996a), but was deemed by the Board to fully meet the intent of WHC-IP-1231. The Decision Board members concurred with the bulk of the Alternative Architecture Evaluation results and recommendations. However, the Board required changes to some criteria definitions and weightings in establishing its own recommendation basis. This report documents information presented to the Decision Board, and the Decision Board`s recommendations and basis for these recommendations. The Board`s recommendations were fully adopted by the WHC Decision Maker, R. J. Murkowski, Manager, TWRS Storage and Disposal. The Decision Board`s recommendation is as follows. The Phase I BLW Interim storage concept architecture will use Vaults 2 and 3 of the Hanford Site Spent Nuclear Fuel Canister Storage Building, being located in the Hanford Site 200 East Area, and include features to faciliate addition of one or more vaults at a later date.

Calmus, R.B.

1996-09-27T23:59:59.000Z

149

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national security needs of the United States. Although the Deputy Secretary of Energy approved

150

NREL Energy DataBus/Resources | Open Energy Information  

Open Energy Info (EERE)

Databus Factsheet Energydatabusfacthseet.pdf Read more about the Energy Databus Retrieved from "http:en.openei.orgwindex.php?titleNRELEnergyDataBusResources&oldid662041...

151

Bus application of oxygen-enrichment technology and diesel-electric hybrid systems  

DOE Green Energy (OSTI)

The amendments to the Clean Air Act (CAA) mandate very strict limits on particulate, smoke, and other emissions from city buses. The use of alternative fuels, such as compressed natural gas (CNG) or methanol, can help transit operators, such as the Chicago Transit Authority (CTA), meet the mandated limits. However, the capital investment needed to convert the fueling infrastructure and buses is large, as is the expense of training personnel. If a {open_quotes}clean diesel{close_quotes} bus can be implemented with the help of oxygen-enrichment technology or a diesel-electric hybrid system, this large investment could be postponed for many years. The Regional Transportation Authority (RTA) initiated this project to evaluate the possibility of applying these technologies to CTA buses. Argonne National Laboratory (ANL) conducted a limited number of engine tests and computer analyses and concluded that both concepts are practical and will help in a {open_quotes}clean diesel{close_quotes} bus that can meet the mandated limits of the CAA amendments. The oxygen enrichment of combustion air depends on the availability of a compact and economical membrane separator. Because the technology for this critical component is still under development, it is recommended that an actual bus demonstration be delayed until prototype membranes are available. The hybrid propulsion system is ready for the demonstration phase, and it is recommended that the CTA and RTA commence planning for a bus demonstration.

Sekar, R.R.; Marr, W.W.

1993-10-01T23:59:59.000Z

152

Fuzzy Approach to Critical Bus Ranking under Normal and Line Outage Contingencies  

E-Print Network (OSTI)

Identification of critical or weak buses for a given operating condition is an important task in the load dispatch centre. It has become more vital in view of the threat of voltage instability leading to voltage collapse. This paper presents a fuzzy approach for ranking critical buses in a power system under normal and network contingencies based on Line Flow index and voltage profiles at load buses. The Line Flow index determines the maximum load that is possible to be connected to a bus in order to maintain stability before the system reaches its bifurcation point. Line Flow index (LF index) along with voltage profiles at the load buses are represented in Fuzzy Set notation. Further they are evaluated using fuzzy rules to compute Criticality Index. Based on this index, critical buses are ranked. The bus with highest rank is the weakest bus as it can withstand a small amount of load before causing voltage collapse. The proposed method is tested on Five Bus Test System.

Shankar, Shobha

2011-01-01T23:59:59.000Z

153

Fusion Breeder Program interim report  

Science Conference Proceedings (OSTI)

This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

Moir, R.; Lee, J.D.; Neef, W.

1982-06-11T23:59:59.000Z

154

Plutonium Finishing Plant. Interim plutonium stabilization engineering study  

SciTech Connect

This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

1995-08-01T23:59:59.000Z

155

NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT  

SciTech Connect

The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

2010-10-19T23:59:59.000Z

156

Evaluation of a residential solar air heating system. Interim progress report, August 1976--May 1977. [Comparison of air-type and liquid-type collectors  

SciTech Connect

The comparative performance of Solar House II collectors (air heater) and Solar House I collectors (liquid heater) is presented. In the 1976 comparison year, there is no conclusive evidence that either system provides a greater fraction of the seasonal load. Both systems were designed to provide approximately 75 percent of the annual space and water heating load, and the design targets are reasonably achieved. In February, 1976, the air system provided 65 percent of the total requirement while the liquid system provided 76 percent. In March, based on a few days of data, the performance was substantially the same. In April the air system provided a greater fraction of solar heat to the total need, but the use of the heat was different, more being used for domestic water heating in Solar House I than in Solar House II. The data for 1977 have not yet been fully analyzed for both solar houses and therefore, a complete comparison cannot be made. At this stage in the evaluations, it can be stated that either system can be designed to achieve the target fraction of the total annual heat requirements. (WHK)

Karaki, S.

1977-05-01T23:59:59.000Z

157

Study on Electric Control System for a Full Hybrid Bus  

Science Conference Proceedings (OSTI)

For efficient and reliable operation of a novel hybrid powertrain assembled in the bus, a set of control strategy combined with the structural characteristics was researched. Based on the identification of the driver's intension, this paper presented ... Keywords: full hybrid bus, eletric control system, stretegy, fuel economy

Zhiguo Kong, Hongxiu Wang

2013-07-01T23:59:59.000Z

158

Global Bus Rapid Transit (BRT) Database | Open Energy Information  

Open Energy Info (EERE)

Global Bus Rapid Transit (BRT) Database Global Bus Rapid Transit (BRT) Database Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Global Bus Rapid Transit (BRT) Database Agency/Company /Organization: EMBARQ Complexity/Ease of Use: Not Available Website: www.brtdata.org/ Equivalent URI: cleanenergysolutions.org/content/global-bus-rapid-transit-brt-database Language: English Related Tools European Green Cars Initiative Guidelines and Toolkits for Urban Transport Development in Medium Sized Cities in India Making Car Sharing and Car Clubs Work: Final Report ... further results Find Another Tool FIND TRANSPORTATION TOOLS This tool provides public access to current data about bus rapid transit systems around the world, including data for the design, performance, and cost of these systems. The database can be filtered by location or

159

Users Perspective on Advanced Fuel Cell Bus Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

Users Perspective on Advanced Fuel Cell Bus Technology Lesl lie Eud dy - NREL Nico Bouwkamp - CaFCP DOE/FTA FCB Workshop DOE/FTA FCB Workshop June 7, 2010 - Transit Agencies FCB Demonstrations Transit Agencies FCB Demonstrations Reasons for participation Reasons for participation - Government regulations to reduce emissions - Public pressure Public pressure - Agency desire to be 'green' - Funding opportunity Funding opportunity - Learn about the newest technology 2 - Challenges: Performance Challenges: Performance Bus should match conventional bus performance Bus should match conventional bus performance - Operate 7 days/week, up to 20 hr/day - Complete day of service with one tank of fuel Complete day of service with one tank of fuel - Keep up with duty-cycle

160

A Model for the Bus System in Cuernevaca (Mexico)  

E-Print Network (OSTI)

The bus transportation system in Cuernevaca, Mexico, has certain distinguished, innovative features and has been the subject of an intriguing, recent study by M. Krbalek and P. Seba. Krbalek and Seba analyzed the statistics of bus arrivals on Line 4 close to the city center. They studied, in particular, the bus spacing distribution and also the bus number variance measuring the fluctuations of the total number of buses arriving at a fixed location during a time interval T. Quite remarkably, it was found that these two statistics are well modeled by the Gaussian Unitary Ensemble (GUE) of random matrix theory. Our goal in this paper is to provide a plausible explanation of these observations, and to this end we introduce a microscopic model for the bus line that leads simply and directly to GUE.

Jinho Baik; Alexei Borodin; Percy Deift; Toufic Suidan

2005-10-19T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Bus industry market study. Report -- Task 3.2: Fuel cell/battery powered bus system  

DOE Green Energy (OSTI)

In support of the commercialization of fuel cells for transportation, Georgetown University, as a part of the DOE/DOT Fuel Cell Transit Bus Program, conducted a market study to determine the inventory of passenger buses in service as of December, 1991, the number of buses delivered in 1991 and an estimate of the number of buses to be delivered in 1992. Short term and long term market projections of deliveries were also made. Data was collected according to type of bus and the field was divided into the following categories which are defined in the report: transit buses, school buses, commercial non-transit buses, and intercity buses. The findings of this study presented with various tables of data collected from identified sources as well as narrative analysis based upon interviews conducted during the survey.

Zalbowitz, M.

1992-06-02T23:59:59.000Z

162

Bus bar electrical feedthrough for electrorefiner system  

SciTech Connect

A bus bar electrical feedthrough for an electrorefiner system may include a retaining plate, electrical isolator, and/or contact block. The retaining plate may include a central opening. The electrical isolator may include a top portion, a base portion, and a slot extending through the top and base portions. The top portion of the electrical isolator may be configured to extend through the central opening of the retaining plate. The contact block may include an upper section, a lower section, and a ridge separating the upper and lower sections. The upper section of the contact block may be configured to extend through the slot of the electrical isolator and the central opening of the retaining plate. Accordingly, relatively high electrical currents may be transferred into a glovebox or hot-cell facility at a relatively low cost and higher amperage capacity without sacrificing atmosphere integrity.

Williamson, Mark; Wiedmeyer, Stanley G; Willit, James L; Barnes, Laurel A; Blaskovitz, Robert J

2013-12-03T23:59:59.000Z

163

Advanced DES System Evaluation Interim Report  

Science Conference Proceedings (OSTI)

A portfolio of electric energy storage options is emerging that provides electric utilities with new options for grid support and operational flexibility. This research and development (RD) project was initiated to assess and test an emerging zinc-bromine (Zn-Br) flow battery in an electric distribution system and to provide input on a utility application specification. This technology is based on a flow battery developed by Exxon in the 1970s and '80s and is now being advanced and commercialized by Prem...

2009-05-19T23:59:59.000Z

164

DOE HQ Shuttle Bus Schedule and Route | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is inappropriate and against the law.

165

Planned Changes to the LBNL Shuttle Bus System  

NLE Websites -- All DOE Office Websites (Extended Search)

Planned Changes to the LBNL Shuttle Bus System Planned Changes to the LBNL Shuttle Bus System Speaker(s): Steve Black Date: December 5, 2006 - 12:00pm Location: 90-3122 BACKGROUND: Several recent issues of Today At Berkeley Lab, including for today, December 1, have called our attention to the planned changes to the Lab's shuttle bus system. If you have not yet viewed the description of the planned new system and the maps showing the new routes it is advisable for you to do so as the changes are significant, not just a "fine tuning". Several EETD staff members and shuttle bus riders have expressed serious concerns about the changes, which has prompted us to set up this special seminar. DESCRIPTION: Steve Black, who is fairly new to the Lab, has responsibility for a number of Laboratory support services

166

Sustainable transport at MIT : improving area bus services  

E-Print Network (OSTI)

Everyday each member of the MIT community makes a decision about how they will travel to school or work. Using the Commuter Habit Survey and information regarding local bus services as guides, this report analyzes the ...

Beasley, Aimee K

2009-01-01T23:59:59.000Z

167

Nuclear Maintenance Applications Center: Isolated Phase Bus Maintenance Guide  

Science Conference Proceedings (OSTI)

This report provides information on design, operating experience, and maintenance practices associated with the isophase bus system. The information is meant to be useful for system engineers, component engineers, maintenance personnel, and their supervision in understanding and maintaining this system. This document is an update to Isolated Phase Bus Maintenance Guide (EPRI report TR-112784), and the scope has been expanded to include boundary components, such as potential transformers (PTs) and current...

2007-12-20T23:59:59.000Z

168

Final Report for the H2Fuel Bus  

DOE Green Energy (OSTI)

The H2Fuel Bus is the world's first hydrogen-fueled electric hybrid transit bus. It was a project developed through a public/private partnership involving several leading technological and industrial organizations, with primary funding by the Department of Energy (DOE). The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen fueled buses and to enhance the public awareness and acceptance of emerging hydrogen technologies.

Jacobs, W.D.

1998-11-25T23:59:59.000Z

169

Interim Stabilization Equipment Essential and Support Drawing Plan  

Science Conference Proceedings (OSTI)

This supporting document provides a list of the Essential and Support drawings for the Interim Stabilization project equipment.

KOCH, M.R.

2000-01-14T23:59:59.000Z

170

Interim Stabilization Equipment Essential and Support Drawing Plan  

SciTech Connect

This supporting document provides a list of the Essential and Support drawings for the Interim Stabilization project equipment.

KOCH, M.R.

2000-01-28T23:59:59.000Z

171

Energy Policy Act Transportation Study: Interim Report on ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration iii Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates Preface This report, ...

172

DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. Within the Combustion Laboratory of the Penn State Energy Institute, they have installed and equipped a Navistar V-8 direct-injection turbodiesel engine for measurement of gaseous and particulate emissions and examination of the impact of fuel composition on diesel combustion. They have also reconfigured a high-pressure viscometer for studies of the viscosity, bulk modulus (compressibility) and miscibility of blends of diesel fuel, dimethyl ether and lubricity additives. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have examined blends of an oxygenated fuel additive (a liquid fuel called CETANER{trademark}) produced by Air Products, for comparison with dimethyl ether blended at the same weight of oxygen addition, 2 wt.%. While they have not operated the engine on DME yet, they are now preparing to do so. A fuel system for delivery of DME/Diesel blends has been configured and initial investigations at low DME blend ratios (around 5-10 vol%) will begin shortly. They have also performed viscosity measurements on diesel fuel, DME and 50-50 blends of DME in diesel. These tests have verified that DME has a much lower viscosity than the diesel fuel and that the viscosity of the blended fuel is also much lower than the diesel base fuel. This has implications for the injection and atomization of the DME/diesel blends.

Elana M. Chapman; Shirish Bhide; Andre L. Boehman; David Klinikowski

2003-04-01T23:59:59.000Z

173

Analysis of U.S. School Bus Populations and Alternative Fuel Potential  

DOE Green Energy (OSTI)

This Clean Cities final report provides information concerning different school bus types, school bus populations, school bus miles and fuel use, school bus emissions, alternative fuel school buses, and potential for alternative fuel school bus use through 2010. It is intended to provide general information concerning the size of the school bus market in the U.S., as well as to provide some quantification of the potential for alternative fuel use in school buses in the U.S., and what that might mean for petroleum displacement and emissions reductions.

Laughlin, M.

2004-04-01T23:59:59.000Z

174

Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment  

Science Conference Proceedings (OSTI)

This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

Spiliotopoulos, Alexandros A.

2013-03-20T23:59:59.000Z

175

Mitigation Methods for Tubular Structures -- Interim Report  

Science Conference Proceedings (OSTI)

This interim report describes the first year of a two-year testing program for methods to prevent or mitigate corrosion in the interior surfaces of steel tubular poles. Two methods are under study: cathodic protection that uses zinc or magnesium sacrificial anodes and rust inhibitors that protect interior surfaces.BackgroundUtilities have become increasingly aware of the potential problems associated with underground ...

2012-12-12T23:59:59.000Z

176

Berkeley Lab: Special Bus/Shuttle Service Reservations  

NLE Websites -- All DOE Office Websites (Extended Search)

Special Service Special Service Buses and/or Vans are available for special service by reservation. Costs are: $136.50 required 2 hour minimum $68.25 per vehicle each additional hour Bus image Bus image Buses accommodate: 41 passengers (26 Seated plus 15 Standing) (and up to 2 wheelchair passengers) Vans accommodate: 15 passengers To arrange special service shuttle transportation: Fill out the request form below A valid project id is required for special service requests Complete the form and click on the "send" button The request for special bus service will be sent to busservices@lbl.gov and reviewed. A confirmation will be sent back via email to the requestor regarding the status. For additional information contact: Kori Porter at 486-5112 or email busservices@lbl.gov.

177

Application Layer Definition and Analyses of Controller Area Network Bus for Wire Harness Assembly Machine  

Science Conference Proceedings (OSTI)

With the feature of multi-master bus access, nondestructive contention-based arbitration and flexible configuration, Controller Area Network (CAN) bus is applied into the control system of Wire Harness Assembly Machine (WHAM). To accomplish desired goal, ...

Hui Guo; Ying Jiang

2006-11-01T23:59:59.000Z

178

SunLine Begins Extended Testing of Hybrid Fuel Cell Bus  

DOE Green Energy (OSTI)

Fact sheet describing the fuel cell hybrid bus demonstration being managed by SunLIne Transit Agency.

Not Available

2008-06-01T23:59:59.000Z

179

BUSpec: A framework for generation of verification aids for standard bus protocol specifications  

Science Conference Proceedings (OSTI)

A typical verification intellectual property (VIP) of a bus protocol such as ARM advanced micro-controller bus architecture (AMBA) or PCI consists of a set of assertions and associated verification aids such as test-benches, design-ware models and coverage ... Keywords: Assertion-based verification, Bus functional models, Protocol validation, Verification intellectual property

Bhaskar Pal; Ansuman Banerjee; Pallab Dasgupta; P. P. Chakrabarti

2007-04-01T23:59:59.000Z

180

Steady State Analysis of an induction generator infinite bus system  

E-Print Network (OSTI)

analysis of grid connected wind energy conver- sion systems employing induction generators, one1 Steady State Analysis of an induction generator infinite bus system Rajesh G Kavasseri Department of Electrical and Computer Engineering North Dakota State University, Fargo, ND 58105 - 5285, USA (email: rajesh

Kavasseri, Rajesh

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Evaluation of Truck and Bus Automation Scenarios: Operations Cost Analysis  

E-Print Network (OSTI)

Standards The design for this project assumes that the ABUS system will operate on a dedicated right- of-waystandards. Like the ABUS system, the BDL system operates on a dedicated right-of-way

Botha, Jan; Day, Jennifer E.; Adibhatla, Nagabhargavi

2004-01-01T23:59:59.000Z

182

Bus Lanes with Intermittent Priority: Screening Formulae and an Evaluation  

E-Print Network (OSTI)

of H, and the maximum possible demand in the inter-bandTSP doubles the maximum excess demand where intermittenceas traffic demand does not exceed by much the maximum flow

Eichler, Michael; Daganzo, Carlos F.

2005-01-01T23:59:59.000Z

183

Technology Validation: Fuel Cell Bus Evaluations - DOE Hydrogen...  

NLE Websites -- All DOE Office Websites (Extended Search)

of FCEB design. Using fuel cells in a transit application can help accelerate the learning curve for the technology because of the high mileage accumulated in short periods...

184

TSPA Third Interim Report - March, 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Interim Report Third Interim Report Total System Performance Assessment Peer Review Panel Preface Executive Summary I. Introduction II. The TSPA-VA Base Case Analysis 1. The TSPA-VA Base Case Analysis A. Results of the TSPA-VA Base Case Analysis B. The Plausibility of the Base Case C. Sensitivity Studies III. Component Models of TSPA A. Unsaturated Zone Infiltration and Flow B. Thermohydrology C. Near-Field Geochemical Environment D. Waste Package Degradation E. Waste Form Alteration/Mobilization F. Unsaturated Zone Transport G. Saturated Zone Flow and Transport H. Biosphere I. Disruptive Events and Climate IV. Conclusions and Recommendations A. Introductory Comments B. Critical Observations and Findings C. Other Issues V. References

185

TSPA First Interim Report - June 20, 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FIRST INTERIM REPORT FIRST INTERIM REPORT TOTAL SYSTEMS PERFORMANCE ASSESSMENT PEER REVIEW PANEL JUNE 20, 1997 i PREFACE The Peer Review Panel has written this report with two distinct audiences in mind: (1) those who are actively engaged in producing the Total Systems Performance Assessment and (2) those who are interested in the progress of the Total Systems Performance Assessment and its implications for future policy decisions. The first group will find some of the introductory information unnecessary and will want to concentrate on the technical findings and explanations. The Panel hopes that the report also contains enough background information and explanations of terms and is written clearly enough that it will be intelligible to the second group, namely those interested in the outcome, but not involved in the technical work. The Panel welcomes

186

TSPA Second Interim Report - December 12, 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SECOND INTERIM REPORT SECOND INTERIM REPORT TOTAL SYSTEM PERFORMANCE ASSESSMENT PEER REVIEW PANEL DECEMBER 12, 1997 i PREFACE This report is the second in a series from the Performance Assessment Peer Review Panel. The Panel considers each successive report as an integral part of a series. Issues that have been covered previously will not be repeated unless new information or concerns arise. In preparing this report, the Panel has directed its primary attention to the methods, data, and assumptions that have been developed or identified for the Total System Performance Assessment to be used in the Viability Assessment. The Panel's goals have been to note weaknesses that can be ameliorated through the use of more appropriate models and data, to seek clarification of the bases for certain of the analytical approaches

187

Stephenson is Interim ALD for Photon Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Students at Argonne on the FaST Track to New Skills Students at Argonne on the FaST Track to New Skills How Did the Caterpillar Cross the Road? R&D 100 Awards for New X-ray Technologies In Nature: Fischetti on Minibeams Sidorowicz of AES Earns UChicago Argonne, LLC Board of Governors Outstanding Service Award for 2010 APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Stephenson is Interim ALD for Photon Sciences OCTOBER 1, 2010 Bookmark and Share G. Brian Stephenson Argonne Director Eric Isaacs has appointed G. Brian Stephenson as the Interim Associate Laboratory Director for Photon Sciences, effective Oct. 1, 2010. The text of Director Isaacs' announcement is below. Sept. 30, 2010 To: All employees From: Eric Isaacs, Argonne Director

188

Decommissioning Pre-Planning Manual: Interim Report  

Science Conference Proceedings (OSTI)

This EPRI Interim Technical Report provides a framework for pre-planning for the decommissioning of a nuclear power plant. It identifies important planning decisions, tasks, and contributing disciplines, establishes activity precedence relationships and defines data requirements. The report identifies actions that utilities can take now to ease the transition to decommissioning status, and will be of value to utilities planning plant closures in the future.

2000-11-08T23:59:59.000Z

189

Interim Report for Advanced Topology Estimator Project  

Science Conference Proceedings (OSTI)

The Advanced Topology Estimator is a critical component in an overall system that will allow operational models of large-scale interconnections to be built, validated, and maintained with a fraction of the time and effort required by traditional electricity management system (EMS) tools. This document provides an interim report on the development of the EPRI Advanced Topology Estimator, which will interface to the EPRI Control Center Application Program (CCAPI) Common Information Model (CIM).

2001-12-20T23:59:59.000Z

190

Development of the bus joint for the ITER Central Solenoid  

SciTech Connect

The terminations of the Central Solenoid (CS) modules are connected to the bus extensions by joints located outside the CS in the gap between the CS and Torodial Field (TF) assemblies. These joints have very strict space limitations. Low resistance is a common requirement for all ITER joints. In addition, the CS bus joints will experience and must be designed to withstand significant variation in the magnetic field of several tenths of a Tesla per second during initiation of plasma. The joint resistance is specified to be less than 4 nOhm. The joints also have to be soldered in the field and designed with the possibility to be installed and dismantled in order to allow cold testing in the cold test facility. We have developed coaxial joints that meet these requirements and have demonstrated the feasibility to fabricate and assemble them in the vertical configuration. We introduced a coupling cylinder with superconducting strands soldered to the surface of the cable that can be installed in the ITER assembly hall and at the Cold Test Facility. This cylinder serves as a transition area between the CS module and the bus extension. We made two racetrack samples and tested four bus joints in our Joint Test Apparatus. Resistance of the bus joints was measured by a decay method and by a microvoltmeter; the value of the current was measured by the Hall probes. This measurement method was verified in the previous tests. The resistance of the joints varied insignificantly from 1.5 to 2 nOhm. One of the challenges associated with a soldered joint is the inability to use corrosive chemicals that are difficult to clean. This paper describes our development work on cable preparation, chrome removal, compaction, soldering, and final assembly and presents the test results.

Martovetsky, Nicolai N [ORNL] [ORNL; Irick, David Kim [ORNL] [ORNL; Kenney, Steven J [ORNL] [ORNL

2013-01-01T23:59:59.000Z

191

Presidential transition: The experience of two interim community college presidents.  

E-Print Network (OSTI)

??The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions… (more)

Thompson, Matthew Dennis

2010-01-01T23:59:59.000Z

192

Energy Policy Act Tranportation Study: Interim Report on Natural ...  

U.S. Energy Information Administration (EIA)

Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates October 1995 ... tariff rates, including up-front capital costs, ...

193

Energy Policy Act Transportation Study: Interim Report on Natural ...  

U.S. Energy Information Administration (EIA)

For your convenience the publication can be viewed or download by section or in its entirety. This report, "Energy Policy Act Transportation Study: Interim Report on ...

194

DOE Names Interim Manager for Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Interim Manager for Idaho Operations Office Dennis Miotla, the Office of Nuclear Energy's Deputy Assistant Secretary Dennis Miotla for Nuclear Power Deployment, has been named the...

195

Healthy Zero Energy Buildings (HZEB) Program- Interim Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Healthy Zero Energy Buildings (HZEB) Program- Interim Report on Cross-Sectional Study of Contaminant Levels, Source Strengths, and Ventilation Rates in Retail Stores Title Healthy...

196

Microsoft Word - Interim Use of Scott Mountain Communications...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Cynthia Rounds Project Manager - TPC-TPP-4 Proposed Action: Interim Use of Scott Mountain Communications Site Budget Information: Work Order 00004688, Task 04...

197

Energy Policy Act Transportation Rate Study: Interim Report on ...  

U.S. Energy Information Administration (EIA)

ii Energy Information Administration/ Energy Policy Act Transportation Rate Study: Interim Report on Coal Transportation Contacts This report, Energy Policy Act ...

198

EIS-0283-S2: Amended Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE))

Disposition of Plutonium Materials from the Department of Energy Standard 3013 Surveillance Program at the Savannah River Site (Amending Interim Action Determination of 12/08/2008)

199

Improving Ventilation and Saving Energy: Relocatable Classroom Field Study Interim Report  

E-Print Network (OSTI)

Energy: Relocatable Classroom Field Study Interim Report GlossaryEnergy: Relocatable Classroom Field Study Interim Report Table of Contents Table of Contents i Glossary.

2005-01-01T23:59:59.000Z

200

Report to Congress on Plan for Interim Storage of Spent Nuclear...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report to Congress on Plan for Interim Storage of Spent Nuclear Fuel from Decommissioned Reactors Report to Congress on Plan for Interim Storage of Spent Nuclear Fuel from...

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Laboratory Shuttle Bus Routes: Potter St./JBEI Shuttle Bus Routes  

NLE Websites -- All DOE Office Websites (Extended Search)

Combined Routes & Schedules Blue Route Orange Route Rockridge Route Potter St./JBEI Route Combined Routes & Schedules Blue Route Orange Route Rockridge Route Potter St./JBEI Route Potter St./JBEI Map Scroll down or click here for schedule ↓ Printable Map | Printable Schedule Potter St/JBEI Route Potter St./JBEI Schedule Bus Service @ lbl.gov email link LBNL - POTTER ST/JBEI START - LBL STOP 65 CORY HALL SHATTUCK BART JCAP POTTER CFO JBEI SHATTUCK BART CORY HALL Depart on the 08's and 38's Depart on the 10's and 40's Depart on the 15's and 45's Depart on the 28's and 58's Depart on the 00's and 30's Depart on the 05's and 35's Depart on the 08's and 35's Depart on the 20's and 50's Depart on the 25's and 55's 1 8:08 AM 8:10 AM 8:15 AM 8:28 AM 8:30 AM 8:35 AM 8:38 AM 8:50 AM 8:55 AM 2 8:38 AM 8:40 AM 8:45 AM 8:58 AM 9:00 AM 9:05 AM 9:08 AM 9:20 AM 9:25 AM

202

Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Hybrid and Zero Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley to someone by E-mail Share Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley on Facebook Tweet about Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley on Twitter Bookmark Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley on Google Bookmark Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley on Delicious Rank Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley on Digg Find More places to share Alternative Fuels Data Center: Hybrid and Zero Emission Truck and Bus Vouchers - San Joaquin Valley on AddThis.com...

203

Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel School Bus Grant and Loan Program to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan Program on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan Program on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan Program on Google Bookmark Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan Program on Delicious Rank Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan Program on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel School Bus Grant and Loan Program on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

204

South Africa-GTZ Bus Rapid Transit Johannesburg | Open Energy Information  

Open Energy Info (EERE)

Africa-GTZ Bus Rapid Transit Johannesburg Africa-GTZ Bus Rapid Transit Johannesburg Jump to: navigation, search Logo: South Africa-GTZ Bus Rapid Transit Johannesburg Name South Africa-GTZ Bus Rapid Transit Johannesburg Agency/Company /Organization GTZ Partner City of Johannesburg Sector Energy Focus Area Transportation Topics Implementation, Policies/deployment programs, Background analysis Website http://www.gtz.de/en/themen/um Program Start 2006 Country South Africa UN Region Southern Africa References GTZ's Contribution to the Johannesburg Rea Vaya Bus Rapid Transit (BRT) Project [1] Sustainable Urban Transport Project [2] Johannesburg started planning a Bus Rapid Transit (BRT) system in November 2006. For the city of Johannesburg and on behalf of KfW Entwicklungsbank, GTZ is working to create a network of bus routes totalling 120 kilometres

205

Public Interest Energy Research (PIER) Program INTERIM REPORT  

E-Print Network (OSTI)

's natural gas supply is conveyed through a robust system of pipelines that run throughout the statePublic Interest Energy Research (PIER) Program INTERIM REPORT MEMS Sensor Designs for Natural Gas for Natural Gas Pipelines is the interim report for the Natural Gas Pipeline Sensors project (contract number

206

NREL Energy DataBus/Contact | Open Energy Information  

Open Energy Info (EERE)

Contact Contact < NREL Energy DataBus Jump to: navigation, search View the Databus Partners NREL's Energy Databus NREL's Energy DataBus is used for tracking and analyzing energy use on its own campus. The system is applicable to other facilities-including anything from a single building to a large military base or college campus-or for other energy data management needs. Managing and minimizing energy consumption on a large campus is usually a difficult task for facility managers: There may be hundreds of energy meters spread across a campus, and the meter data are often recorded by hand. Even when data are captured electronically, there may be measurement issues or time periods that may not coincide. Making sense of this limited and often confusing data can be a challenge that makes the assessment of

207

Fuel Cell Technologies Program Record 12012: Fuel Cell Bus Targets  

NLE Websites -- All DOE Office Websites (Extended Search)

Fuel Cell Technologies Program Record Fuel Cell Technologies Program Record Record #: 12012 Date: March 2, 2012 Title: Fuel Cell Bus Targets Originator: Jacob Spendelow and Dimitrios Papageorgopoulos Approved by: Sunita Satyapal * Date: September 12, 2012 Item: Performance, cost, and durability targets for fuel cell transit buses are presented in Table 1. These market-driven targets represent technical requirements needed to compete with alternative technologies. They do not represent expectations for the status of the technology in future years. Table 1. Performance, cost, and durability targets for fuel cell transit buses. Units 2012 Status 2016 Target Ultimate Target Bus Lifetime years/miles 5/100,000 1 12/500,000 12/500,000 Power Plant Lifetime 2,3 hours 12,000 18,000 25,000

208

NREL Energy DataBus/Partners | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » NREL Energy DataBus/Partners < NREL Energy DataBus Jump to: navigation, search Energy Databus Commercial Partners Buffalo.png Buffalo Software offers Databus Support and Maintenance contracts, Installation of Databus and also offers feature development for new custom databus features. We have some committers on the NREL Energy Databus project and can easily customize and help make the Energy Databus meet your company's needs. We also offer training on Databus as well as certification to ensure your devices work with Databus. Buffalo Software (303) 517-8902 Magpie.jpg

209

Designing New Transit Bus Garages to be Fuel Flexible  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Designing New Transit Bus Garages to be Fuel Flexible Prepared By: Marathon Technical Services Six Venus Crescent P.O. Box 318 Heidelberg, Ontario, Canada N0B1Y0 Telephone: 519-699-9250 May 12, 2006 ______________________________________________________________________________ DESIGNING NEW TRANSIT BUS GARAGES TO BE FUEL FLEXIBLE Background Information Before discussing the building design features that are recommended for CNG and GH2 buses, it is important to understand what makes these fuels different from gasoline or diesel. The items below summarize the basic differences between the properties of gaseous and liquid fuels that influence the building design changes: 1. Natural Gas and Hydrogen are both lighter-than-air and in gaseous form at atmospheric

210

American Transmission Company Comments - 216h Interim Final Rules |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Transmission Company Comments - 216h Interim Final Rules American Transmission Company Comments - 216h Interim Final Rules American Transmission Company Comments - 216h Interim Final Rules American Transmission Company LLC, by its corporate manager, ATC Management Inc. (collectively "ATCLLC") is pleased to have the opportunity to provide the following comments on the additional matters to be considered by DOE in connection with the Rules. Interim Final Rule Comments, RIN 1901-AB18 Coordination of Federal Authorizations for Electric Transmission Facilities More Documents & Publications Comments of the Staff of the public utilities commission of the state of California on the interim final rule Comments on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities

211

The systems edge of the Parameterized Linear Array with a Reconfigurable Pipelined Bus System (LARPBS(p)) optical bus parallel computing model  

Science Conference Proceedings (OSTI)

This paper is about exploring the various systems related aspects pertinent in the recent Parameterized Linear Array with a Reconfigurable Pipelined Bus System (LARPBS(p)) model. The two principal features of the LARPBS(p) model is, firstly, its bridging ... Keywords: Optical bus, Parallel computing model

Brian J. D'Auriol

2009-05-01T23:59:59.000Z

212

Distribution Operations Guide to Enterprise Service Bus Suites  

Science Conference Proceedings (OSTI)

Enterprise integration is often the last crosscutting issue considered when a firm implements a large information system. Organizations frequently find that after a period of time they are in possession of what can be described as Accidental Architecture, often the result of the evolution of systems and point-to-point integration. These ramshackle systems become increasingly unwieldy and expensive to maintain. To avoid these problems, the implementation and use of an Enterprise Service Bus (ESB) is a cri...

2010-11-15T23:59:59.000Z

213

Central waste complex interim safety basis  

Science Conference Proceedings (OSTI)

This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste.

Cain, F.G.

1995-05-15T23:59:59.000Z

214

FTA-Characteristics of Bus Rapid Transit for Decision-Making | Open Energy  

Open Energy Info (EERE)

FTA-Characteristics of Bus Rapid Transit for Decision-Making FTA-Characteristics of Bus Rapid Transit for Decision-Making Jump to: navigation, search Tool Summary LAUNCH TOOL Name: FTA-Characteristics of Bus Rapid Transit for Decision-Making Agency/Company /Organization: Federal Transit Administration, United States Department of Transportation Focus Area: Transportation Resource Type: Publications, Guide/manual User Interface: Other Website: www.nbrti.org/docs/pdf/Characteristics_BRT_Decision-Making.pdf Cost: Free Language: English FTA-Characteristics of Bus Rapid Transit for Decision-Making Screenshot References: FTA-Characteristics of Bus Rapid Transit for Decision-Making[1] "The Characteristics of Bus Rapid Transit for Decision-Making (CBRT) report was prepared to provide transportation planners and decision makers with

215

Harmonization and Sharing of Data from International Fuel Cell Bus Demonstrations (Presentation)  

DOE Green Energy (OSTI)

This presentation, which was given by NREL's Leslie Eudy at the 2006 Fuel Cell Seminar, provides information on international fuel cell bus demonstrations.

Eudy, L.

2006-11-15T23:59:59.000Z

216

PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS  

SciTech Connect

The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

MAY TH

2008-08-12T23:59:59.000Z

217

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

218

Acquisition Career Management Program Manual Interim Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Program Manual Management Program Manual Interim Guidance Partial Revision Chapter 11 Contracting Officers Representatives (COR) Contracting Officers Representatives Background FAI published a report in 2003 on the competencies necessary for the COR job function and the US Merit Systems Protection Board published a report in 2005 entitled "Contracting Officer Representatives: Managing the Government's Technical Experts to Achieve Positive Contract Outcomes." Both reports are available at www.fai.gov. A common theme in these reports is the need to organize and support the COR community to ensure that acquisition management is implemented effectively. Some of the findings and recommendations of the reports are: * CORs must be formally delegated authority to work on particular contracts

219

Interim report on long range plan for nuclear physics  

SciTech Connect

The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC.

1995-04-01T23:59:59.000Z

220

DOE lead agency interim final and proposed rules - EEI comments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

final and proposed rules - EEI comments 10-20-08.doc Consolidated Comments of the Edison Electric Institute ("EEI") on (1) DOE Interim Final Rule, RIN 1901-AB18, 73 Fed. Reg....

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Final Environmental Impact Statement Safe Interim Storage Of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

retrieved, transferred and Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes file:I|Data%20Migration%20TaskEIS-0212-FEIS-Summary-1995.html6...

222

TANK FARM INTERIM SURFACE BARRIER MATERIALS AND RUNOFF ALTERNATIVES STUDY  

SciTech Connect

This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

HOLM MJ

2009-06-25T23:59:59.000Z

223

Stability of Biodiesel and Biodiesel Blends: Interim Report  

DOE Green Energy (OSTI)

This is an interim report for a study of biodiesel oxidative stability. It describes characterization and accelerated stability test results for 19 B100 samples and six diesel fuels.

McCormick, R. L.; Alleman, T. L.; Waynick, J. A.; Westbrook, S. R.; Porter, S.

2006-04-01T23:59:59.000Z

224

Comments of NRDC on Department of Energy Interim Final Rule:...  

NLE Websites -- All DOE Office Websites (Extended Search)

NRDC on Department of Energy Interim Final Rule: Energy Conservation for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise...

225

AGR-1 Data Qualification Interim Report  

SciTech Connect

Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010.

Machael Abbott

2009-08-01T23:59:59.000Z

226

FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month...  

NLE Websites -- All DOE Office Websites (Extended Search)

7693 May 2010 FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report R. Barnitt National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado...

227

Interim Storage of Used or Spent Nuclear Fuel Position Statement  

E-Print Network (OSTI)

The American Nuclear Society (ANS) supports the safe, controlled, licensed, and regulated interim storage of used nuclear fuel (UNF) (irradiated, spent fuel from a nuclear power reactor) until disposition can be determined and completed. ANS supports the U.S. Nuclear Regulatory Commission’s (NRC’s) determination that “spent fuel generated in any reactor can be stored safely and without significant environmental impacts for at least 30 years beyond the licensed life for operation. ” 1 Current operational and decommissioned nuclear power plants in the United States were licensed with the expectation that the UNF would be stored at the nuclear power plant site until shipment to an interim storage facility, reprocessing plant, or permanent storage. Because of delays in Federal programs and policy issues, utilities have been forced to store UNF. Current means of interim storage of UNF at nuclear power plant sites include storage of discharged fuel in a water-filled pool or in a sealed dry cask, both under safe, controlled, and monitored conditions. This UNF interim storage is designed, managed, and controlled to minimize or preclude potential radiological hazards or material releases. At nuclear power plant sites in the United States and internationally, this interim storage is regulated under site license requirements and technical specifications imposed by the national or state regulator. In the United States, NRC is the licensing and regulatory authority. ANS believes that UNF interim storage

unknown authors

2008-01-01T23:59:59.000Z

228

NREL Energy DataBus | Open Energy Information  

Open Energy Info (EERE)

NREL Energy DataBus NREL Energy DataBus (Redirected from Databus) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: NREL's Energy Databus Agency/Company /Organization: NREL Sector: Energy Resource Type: Dataset, Online calculator User Interface: Website Website: www.nrel.gov/analysis/databus/index.html Country: United States Web Application Link: www.nrel.gov/analysis/databus/index.html Cost: Free OpenEI Keyword(s): Featured UN Region: Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

229

NREL Energy DataBus | Open Energy Information  

Open Energy Info (EERE)

NREL Energy DataBus NREL Energy DataBus Jump to: navigation, search Tool Summary LAUNCH TOOL Name: NREL's Energy Databus Agency/Company /Organization: NREL Sector: Energy Resource Type: Dataset, Online calculator User Interface: Website Website: www.nrel.gov/analysis/databus/index.html Country: United States Web Application Link: www.nrel.gov/analysis/databus/index.html Cost: Free OpenEI Keyword(s): Featured UN Region: Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

230

The Design of Micro-Satellite AOCS Software Architecture Based on Software Bus  

Science Conference Proceedings (OSTI)

A new attitude and orbit control system (AOCS) software architecture is presented in this paper by using the concept of software bus. According to the analysis of the function flow and data flow of AOCS, its software components are partitioned clearly ... Keywords: AOCS software architecture, software bus, software components

Chen Jian; Yan Ruidong; Sun Zhaowei; Xu Guodong

2012-10-01T23:59:59.000Z

231

Study on Energy-Saving Control Strategy of Idling Stop System for City Bus  

Science Conference Proceedings (OSTI)

Fuel economy of city bus is poor, because the urban traffic is congested, the city bus is constantly in the idle condition resulting in fuel consumption is increasing. In order to improve the vehicle fuel economy and protect environment, the energy consumption ... Keywords: idling stop, energy-saving, control strategy, regenerative braking

Daxing Huang; Ren He

2010-06-01T23:59:59.000Z

232

NREL's Hydrogen-Powered Bus Serves as Showcase for Advanced Vehicle Technologies (AVT) (Brochure)  

DOE Green Energy (OSTI)

Brochure describes the hydrogen-powered internal combustion engine (H2ICE) shuttle bus at NREL. The U.S. Department of Energy (DOE) is funding the lease of the bus from Ford to demonstrate market-ready advanced technology vehicles to visitors at NREL.

Not Available

2010-08-01T23:59:59.000Z

233

Modeling shared cache and bus in multi-cores for timing analysis  

Science Conference Proceedings (OSTI)

Timing analysis of concurrent programs running on multi-core platforms is currently an important problem. The key to solving this problem is to accurately model the timing effects of shared resources in multi-cores, namely shared cache and bus. In this ... Keywords: WCET, multi-core, shared bus, shared cache

Sudipta Chattopadhyay; Abhik Roychoudhury; Tulika Mitra

2010-06-01T23:59:59.000Z

234

Drive Cycle Analysis, Measurement of Emissions and Fuel Consumption of a PHEV School Bus: Preprint  

DOE Green Energy (OSTI)

The National Renewable Energy Laboratory (NREL) collected and analyzed real-world school bus drive cycle data and selected similar standard drive cycles for testing on a chassis dynamometer. NREL tested a first-generation plug-in hybrid electric vehicle (PHEV) school bus equipped with a 6.4L engine and an Enova PHEV drive system comprising a 25-kW/80 kW (continuous/peak) motor and a 370-volt lithium ion battery pack. A Bluebird 7.2L conventional school bus was also tested. Both vehicles were tested over three different drive cycles to capture a range of driving activity. PHEV fuel savings in charge-depleting (CD) mode ranged from slightly more than 30% to a little over 50%. However, the larger fuel savings lasted over a shorter driving distance, as the fully charged PHEV school bus would initially operate in CD mode for some distance, then in a transitional mode, and finally in a charge-sustaining (CS) mode for continued driving. The test results indicate that a PHEV school bus can achieve significant fuel savings during CD operation relative to a conventional bus. In CS mode, the tested bus showed small fuel savings and somewhat higher nitrogen oxide (NOx) emissions than the baseline comparison bus.

Barnitt, R.; Gonder, J.

2011-04-01T23:59:59.000Z

235

Analysis of the impact of bus implemented EDCs on on-chip SSN  

Science Conference Proceedings (OSTI)

In this paper we analyze the impact of error detecting codes, implemented on an on-chip bus, on the on-chip simultaneous switching noise (SSN). First, we analyze in detail how SSN is impacted by different bus transitions, pointing out its dependency ...

Daniele Rossi; Carlo Steiner; Cecilia Metra

2006-03-01T23:59:59.000Z

236

Ground Source Heat Pump Air Conditioner Monitoring Control System Design Based on CAN Bus  

Science Conference Proceedings (OSTI)

Based on CAN bus technology, chooses ST's ARM Cortex-M3 core, new generation STM32 embedded enhanced processor STM32F103 as main control chip, designs the overall structure of system, CAN functional block diagram, CAN communication software and so on. ... Keywords: CAN bus embedded STM32F103

Tong Gang; Li Ping

2010-06-01T23:59:59.000Z

237

UNDP-GEF Fuel Cell Bus Programme: Update | Open Energy Information  

Open Energy Info (EERE)

UNDP-GEF Fuel Cell Bus Programme: Update UNDP-GEF Fuel Cell Bus Programme: Update Jump to: navigation, search Tool Summary Name: UNDP-GEF Fuel Cell Bus Programme: Update Agency/Company /Organization: United Nations Development Programme, Global Environment Facility Focus Area: Fuels & Efficiency Topics: Best Practices Website: www.thegef.org/gef/sites/thegef.org/files/documents/GEF.C.28.Inf_.12.p The Global Environment Facility (GEF) and the United Nations Development Programme launched a fuel cell bus deployment program to support commercial demonstrations of buses and fueling infrastructure in large bus markets in developing countries. The program's objective was to reduce the long-term greenhouse gas emissions from the transport sector in GEF program countries. How to Use This Tool This tool is most helpful when using these strategies:

238

Interim measure work plan/design for Agra, Kansas.  

Science Conference Proceedings (OSTI)

This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the vadose zone by soil vapor extraction (SVE). (4) Volatilization of contaminants from portions of the affected aquifer that can be accessed from the former CCC/USDA property. The primary objective of the proposed removal action is removal of mass quantities of carbon tetrachloride from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area, to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. This objective will be the basis for evaluating system performance. The scope of action outlined in the IMWP/D is limited to the five treatment zones defined by the LDB/SVE/AS locations. Surrounding soils and groundwater will benefit; however, remedial benefits to groundwater will be limited to the area of influence associated with the five treatment zones. While treatment should be aggressive in the vicinity of the LDB locations, the heterogeneity, clay content, and low permeability of the soils will place inherent limits on the area of influence.

LaFreniere, L. M.; Environmental Science Division

2008-11-18T23:59:59.000Z

239

Database and Interim Glass Property Models for Hanford HLW Glasses  

SciTech Connect

The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region.

Hrma, Pavel R.; Piepel, Gregory F.; Vienna, John D.; Cooley, Scott K.; Kim, Dong-Sang; Russell, Renee L.

2001-07-24T23:59:59.000Z

240

Interim performance criteria for photovoltaic energy systems. [Glossary included  

DOE Green Energy (OSTI)

This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

1980-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

FINAL DOE/OR/21950-1016 RESPONSIVENESS SUMMARY= PRAXAIR INTERIM ACTIONS ENGINEERING  

Office of Legacy Management (LM)

p//l/ * :P/ p//l/ * :P/ 142366 _ FINAL DOE/OR/21950-1016 RESPONSIVENESS SUMMARY= PRAXAIR INTERIM ACTIONS ENGINEERING EVALUATION/COST ANALYSIS (EEKA) TONAWANDA, NEW YORK MAY 1996 prepared by U.S. Department of Energy, Oak Ridge Operations Off ice, Formerly Utilized Sites Remedial Action Program with technical assistance from Science Applications International Corporation ESC-FUSRAP under Contract No. DE-AC05-91OR21950 TABLE OF CONTENTS LISTOFTABLES ........................................... iii ACRONYMS AND ABBREVIATIONS ............................... v 1. INTRODUCTION ......................................... 1 2. SCOPE AND ORGANIZATION OF THE RESPONSIVENESS SUMMARY ..... 1 3. COMMENTSANDRESPONSES ....................... .: ... . .... 1 3.1 THE PREFERRED REMEDY .............................

242

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement  

SciTech Connect

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

Noel Duckwtiz

2011-05-01T23:59:59.000Z

243

NREL Energy DataBus/Nonprofit Partners | Open Energy Information  

Open Energy Info (EERE)

Nonprofit Partners Nonprofit Partners < NREL Energy DataBus Jump to: navigation, search Energy Databus Non-Profit Partners Nrellogo.jpg The National Renewable Energy Laboratory is the founder of the Energy Databus. NREL is located in Golden, Colorado. Become a Databus partner If you would like to register as a Databus partner, please send email to with the following information: Organization Name Organization Website Phone Contact Email Contact Name of Contact Description of what you support To be approved as a Databus partner, you must fill in a description that tells the community about what you are in the stages of developing that will work with Databus or what services/support you offer on or around Databus including products that might work with Databus through the Databus

244

TL5002 Provides DDR Bus Termination Power Supply  

E-Print Network (OSTI)

Double data rate (DDR) bus termination power requirements bring new challenges to the power supply by requiring voltage tracking of a reference supply, requiring both sourcing and sinking current, and maintaining a high efficiency over a wide current range. This paper address these issues while presenting an example DDR design of 12 A of output current with voltage outputs between 0.9 V and 1.25 V. Issues and their solutions are provided for the power supply operating as a tradition buck power stage in the sourcing mode as well as for operating as a synchronous boost regulator in the sinking mode. Regulation and control loop characteristics of the examples are presented for both current sinking and sourcing modes of operation. Transient load response is also presented showing output voltage variation, as the current is transitioned from sourcing to sinking.

Robert Kollman; John Betten; Bang S. Lee

2001-01-01T23:59:59.000Z

245

Characteristics of Pipe-Type Cable Fluids and Development of Risk-Based Cleanup Goals: Interim Report  

Science Conference Proceedings (OSTI)

Underground transmission cables transmit electricity in many urban areas of the United States. In high-pressure fluid-filled (HPFF) pipe-type cables, the cable interior is filled with insulating fluid. Occasionally, cables can leak, and the fluid can contaminate surrounding soil. This report presents interim results of a project to characterize the physical and chemical properties of HPFF cable fluids, evaluate their fate and transport in the environment, and develop soil cleanup levels for the fluids th...

2002-03-06T23:59:59.000Z

246

2H2A Hydrogen Delivery Infrastructure Analysis Models and Conventional Pathway Options Analysis Results - Interim Report  

NLE Websites -- All DOE Office Websites (Extended Search)

H2A Hydrogen Delivery Infrastructure Analysis Models and H2A Hydrogen Delivery Infrastructure Analysis Models and Conventional Pathway Options Analysis Results DE-FG36-05GO15032 Interim Report Nexant, Inc., Air Liquide, Argonne National Laboratory, Chevron Technology Venture, Gas Technology Institute, National Renewable Energy Laboratory, Pacific Northwest National Laboratory, and TIAX LLC May 2008 Contents Section Page Executive Summary ................................................................................................................... 1-9 Delivery Options ...................................................................................................................... 1-9 Evaluation of Options 2 and 3 ................................................................................................. 1-9

247

EPA issues interim final waste minimization guidance  

SciTech Connect

The U.S. Environmental Protection Agency (EPA) has released a new and detailed interim final guidance to assist hazardous waste generators in certifying they have a waste minimization program in place under the Resource Conservation and Recovery Act (RCRA). EPA's guidance identifies the basic elements of a waste minimization program in place that, if present, will allow people to certify they have implemented a program to reduce the volume and toxicity of hazardous waste to the extent economically practical. The guidance is directly applicable to generators of 1000 or more kilograms per month of hazardous waste, or large-quantity generators, and to owners and operators of hazardous waste treatment, storage or disposal facilities who manage their own hazardous waste on site. Small-quantity generators that generate more than 100 kilograms, but less than 1,000 kilograms, per month of hazardous waste are not subject to the same program in place certification requirement. Rather, they must certify on their manifests that they have made a good faith effort to minimize their waste generation.

Bergeson, L.L.

1993-08-01T23:59:59.000Z

248

Permitting plan for the high-level waste interim storage  

SciTech Connect

This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

Deffenbaugh, M.L.

1997-04-23T23:59:59.000Z

249

Heisenberg Spin Bus as a Robust Transmission Line for Perfect State Transfer  

E-Print Network (OSTI)

We study the protocol known as quantum state transfer for a strongly coupled antiferromagnetic spin chain or ring (acting as a spin bus), with weakly coupled external qubits. By treating the weak coupling as a perturbation, we find that perfect state transfer (PST) is possible when second order terms are included in the expansion. We also show that PST is robust against variations in the couplings along the spin bus and between the bus and the qubits. As evidence of the quantum interference which mediates PST, we show that the optimal time for PST can be smaller with larger qubit separations, for an even-size chain or ring.

Sangchul Oh; Lian-Ao Wu; Yun-Pil Shim; Mark Friesen; Xuedong Hu

2011-02-03T23:59:59.000Z

250

EIS-0283-S2: Interim Action Determination | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

K-Area Materials Storage (KAMS) Area Expansion at the Savannah River Site) K-Area Materials Storage (KAMS) Area Expansion at the Savannah River Site) In order to meet the safe, secure storage demand for pit disassembly metals and non-pit plutonium that may be available soon after the SPD SEIS ROD, DOE has a need to initiate storage area construction preparations in advance of the SPD SEIS ROD. Specifically, beginning in May 2013, DOE plans to extend the KAMS Area into the current Final Storage Area and Presentation Room to store additional quantities of surplus plutonium, and, potentially, plutonium alloys. EIS-0283-S2-InterimActionDetermination_04_25_13.pdf More Documents & Publications EIS-0283-S2: Draft Supplemental Environmental Impact Statement EIS-0283-S2: Amended Interim Action Determination EIS-0283-S2: Interim Action Determination

251

Single-shell tank interim stabilization project plan  

SciTech Connect

Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. The plan is based on realistic assumptions and addresses three separate funding scenarios.

Ross, W.E.

1998-03-27T23:59:59.000Z

252

High Temperature Materials Interim Data Qualification Report  

SciTech Connect

ABSTRACT Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: 1. Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing – 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. 2. Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram – 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

Nancy Lybeck

2010-08-01T23:59:59.000Z

253

Volume 5: Waste Forms for Interim Storage, Revision 1  

Science Conference Proceedings (OSTI)

In the 1990s, the Electric Power Research Institute (EPRI) published a series of guidance reports on Interim On-Site Storage of Low Level Waste due to concern that loss of access to disposal pathways might one day lead to the need for interim on-site storage of low level waste (LLW). With the closure of the Barnwell Disposal Site to out-of-compact waste in 2008, 85% of the industry has, in fact, been faced with the loss of a disposal pathway for their Class B and C LLW, resulting in the reality of on-sit...

2011-09-14T23:59:59.000Z

254

Interim safety basis for fuel supply shutdown facility  

SciTech Connect

This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings.

Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

1995-05-23T23:59:59.000Z

255

The Wheels on the Bus Go Round and Round... | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Wheels on the Bus Go Round and Round... The Wheels on the Bus Go Round and Round... The Wheels on the Bus Go Round and Round... March 9, 2010 - 5:30am Addthis Shannon Brescher Shea Communications Manager, Clean Cities Program I have a love/hate relationship with buses. I love that they save me gasoline, are more efficient than driving a car, and reduce my greenhouse gas emissions. However, I hate them when they're running late! But there is one category of buses that I'm particularly fond of - those that run on alternative fuels. In fact, alternative fuel and advanced technology transit buses offer a number of health, environmental, and social benefits. As anyone who has walked behind a traditional diesel bus knows, the plume of black smoke from its tailpipe is both unpleasant and unhealthy. That

256

Secretary Bodman Tours LNG Powered City Bus in Seoul | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LNG Powered City Bus in Seoul LNG Powered City Bus in Seoul Secretary Bodman Tours LNG Powered City Bus in Seoul December 13, 2006 - 9:46am Addthis Joins Secretary Gutierrez to Highlight Cooperation in Developing and Deploying Clean Energy Technologies SEOUL, KOREA - U.S. Secretary of Energy Samuel W. Bodman today joined U.S. Commerce Secretary Carlos Gutierrez in Seoul, Korea to view a city bus and industrial equipment powered by liquefied natural gas (LNG) built with U.S. technology. Secretaries Bodman and Gutierrez and senior Korean government officials highlighted the importance of diversifying to clean and efficient energy sources to increase global energy security. "South Korea and the United States are allies in advancing the use of cleaner, safer, and healthier clean energy technologies," Secretary Bodman

257

TRB-Transit Cooperative Research Program (TCRP): Case Studies in Bus Rapid  

Open Energy Info (EERE)

TRB-Transit Cooperative Research Program (TCRP): Case Studies in Bus Rapid TRB-Transit Cooperative Research Program (TCRP): Case Studies in Bus Rapid Transit Jump to: navigation, search Tool Summary LAUNCH TOOL Name: TRB-Transit Cooperative Research Program (TCRP): Case Studies in Bus Rapid Transit Agency/Company /Organization: Transportation Research Board Focus Area: Transportation Resource Type: Publications, Lessons learned/best practices, Case studies/examples Website: www.trb.org/Main/Public/Blurbs/152921.aspx Country: United States, Australia, United Kingdom, France, Colombia, Brazil, Ecuador Cost: Free Northern America, Australia and New Zealand, Northern Europe, Western Europe, South America, South America, South America Language: English TRB-Transit Cooperative Research Program (TCRP): Case Studies in Bus Rapid Transit Screenshot

258

NREL Showcases Hydrogen Internal Combustion Engine Bus, Helps DOE Set Standards for Outreach (Fact Sheet)  

SciTech Connect

This fact sheet describes the National Renewable Energy Laboratory's (NREL's) accomplishments in showcasing a Ford hydrogen-powered internal combustion engine (H2ICE) bus at The Taste of Colorado festival in Denver. NREL started using its U.S. Department of Energy-funded H2ICE bus in May 2010 as the primary shuttle vehicle for VIP visitors, members of the media, and new employees. In September 2010, NREL featured the bus at The Taste of Colorado. This was the first major outreach event for the bus. NREL's educational brochure, vehicle wrap designs, and outreach efforts serve as a model for other organizations with DOE-funded H2ICE buses. Work was performed by the Hydrogen Education Group and Market Transformation Group in the Hydrogen Technologies and Systems Center.

2010-11-01T23:59:59.000Z

259

The Energy DataBus (Fact Sheet), NREL (National Renewable Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

for particular sites and applications. Free Software for Open-Source Development The Energy DataBus uses open-source software, which not only saves the high cost of licensed...

260

The Wheels on the Bus Go Round and Round... | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Wheels on the Bus Go Round and Round... The Wheels on the Bus Go Round and Round... The Wheels on the Bus Go Round and Round... March 9, 2010 - 5:30am Addthis Shannon Brescher Shea Communications Manager, Clean Cities Program I have a love/hate relationship with buses. I love that they save me gasoline, are more efficient than driving a car, and reduce my greenhouse gas emissions. However, I hate them when they're running late! But there is one category of buses that I'm particularly fond of - those that run on alternative fuels. In fact, alternative fuel and advanced technology transit buses offer a number of health, environmental, and social benefits. As anyone who has walked behind a traditional diesel bus knows, the plume of black smoke from its tailpipe is both unpleasant and unhealthy. That

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data collection plan for Phase 2 Alternative Fuels Bus Data Collection Program. Final report  

DOE Green Energy (OSTI)

This document constitutes the plan for collecting and reporting data associated with a special set of transit bus demonstrations to be conducted under the Urban Bus Program of the Alternative Motor Fuels Act (AMFA) of 1988. This program, called the Phase 2 Bus Data Collection Program, serves as an adjunct to the Phase I Bus Data Collection Program, collecting detailed data on just a few buses to augment and enhance the Phase 1 data in fulfilling the urban bus requirements of AMFA. Demonstrations will be conducted at a few transit system locations throughout the US and will use alternative fuels and associated technologies to reduce undesirable transit bus exhaust emissions. Several organizations will be involved in the data collection; NREL will manage the program, analyze and store vehicle data, and make these data available through the Alternative Fuels Data Center. This information will enable transit agencies, equipment manufacturers, fuel suppliers, and government policy makers to make informed decisions about buying and using alternative fuels.

Krenelka, T. [Battelle Columbus Labs., OH (United States)

1993-07-01T23:59:59.000Z

262

King County Metro Transit Hybrid Articulated Buses: Interim Evaluation...  

NLE Websites -- All DOE Office Websites (Extended Search)

CA Peterbilt378, Class 8 truck Cummins Westport ISXG high-pressure direct injection LNG and diesel Completed in 2004 Note: CNG compressed natural gas; LNG liquefied...

263

Distributed Energy Storage Systems Testing and Evaluation 2010 Interim Results  

Science Conference Proceedings (OSTI)

Distributed Energy Storage Systems (DESS) are fully integrated AC storage devices which can be located within the distribution system, at substation locations, off distribution feeders, near end-of-line pad mounted transformers, or on customer side of the meter locations. Many new and emerging storage systems are being developed for grid support, outage mitigation, power quality and peak load energy management. However there is limited operational data on performance, grid comparability, durability, reli...

2010-12-20T23:59:59.000Z

264

Preventing Biogas Generation in Low Level Waste: Interim Report  

Science Conference Proceedings (OSTI)

This interim report describes actions that can be taken to control and prevent biogas generation in waste containers and plant systems. In addition, it describes additional work in progress that will form the basis for the final report. This research was undertaken in response to nuclear power stations experiencing biogas generation from plant systems and low level waste containers.

1997-11-11T23:59:59.000Z

265

Public Interest Energy Research (PIER) Program INTERIM REPORT  

E-Print Network (OSTI)

Public Interest Energy Research (PIER) Program INTERIM REPORT SOLAR REFLECTANCES OF ROOFS/Agricultural/Water EndUse Energy Efficiency · Renewable Energy Technologies · Transportation Solar Reflectances of solar energy that is reflected by the roof. Reflectance tests were conducted following American

266

Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation  

SciTech Connect

Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives. (JGB)

1976-05-01T23:59:59.000Z

267

Research, development and demonstration of a fuel cell/battery powered bus system. Phase 1, Final report  

DOE Green Energy (OSTI)

Purpose of the Phase I effort was to demonstrate feasibility of the fuel cell/battery system for powering a small bus (under 30 ft or 9 m) on an urban bus route. A brassboard powerplant was specified, designed, fabricated, and tested to demonstrate feasibility in the laboratory. The proof-of-concept bus, with a powerplant scaled up from the brassboard, will be demonstrated under Phase II.

NONE

1990-02-28T23:59:59.000Z

268

Fuel Cell Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation Team  

E-Print Network (OSTI)

, compressed natural gas (CNG), criteria emissions, demographic, E85, Energy Commission, environmental justice Category: Natural Gas for School Fleets, CNG Station, LNG or L/CNG Station · Bear Valley Unified School to the wholesale or retail distribution and sales stations. The projects will be assessed in two separate rounds

269

Fuel Cell Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation Team  

E-Print Network (OSTI)

About This Document..................................................................................................................... 3

For The

2003-01-01T23:59:59.000Z

270

Microsoft Word - EM-TWS Interim Report 02-21-11 final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INTERIM REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD INTERIM REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Environmental Management Tank Waste Subcommittee (EM-TWS) FY 2011 Work Plan Status Modeling for Life Cycle Cost Analysis (Interim Report) February 24, 2011 Hanford Tank Farms and WTP SRS Tank Farms Presented by the EM Tank Waste Subcommittee Las Vegas, Nevada EM-TWS Interim Report, February 2011 1 Business Sensitive INTERIM REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Environmental Management Tank Waste Subcommittee (EM-TWS) Fiscal Year (FY) 2011 Work Plan Status Modeling for Life Cycle Cost (LCC) Analysis (Interim Report) February 24, 2011 1. Introduction 1.1 DOE EM response to FY 2010 EM-TWS Phase 1 Report and Recommendations (Attachment 1) The DOE Office of Environmental Management has adopted most of the

271

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

272

A Report on Worldwide Hydrogen Bus Demonstrations, 2002-2007 | Open Energy  

Open Energy Info (EERE)

A Report on Worldwide Hydrogen Bus Demonstrations, 2002-2007 A Report on Worldwide Hydrogen Bus Demonstrations, 2002-2007 Jump to: navigation, search Tool Summary Name: A Report on Worldwide Hydrogen Bus Demonstrations, 2002-2007 Agency/Company /Organization: US DOT Focus Area: Vehicles Topics: Analysis Tools Website: www.fuelcells.org/wp-content/uploads/2012/02/busreport.pdf From 2002-2007 > 20 cities in the US, Europe, China, Japan & Australia demonstrated buses powered by fuel cells or hydrogen-fueled internal combustion engines. The resulting report analyzes lessons learned from the demonstrations, identifies key remaining challenges for introduction of the technology, & suggests potential roles for government in supporting commercialization of fuel cell buses. How to Use This Tool This tool is most helpful when using these strategies:

273

,,"PARS II Interim Migration Template"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

" " ,,"PARS II Interim Migration Template" ,,"Fields","Data" ,,"DOE Project ID:","DOE Project # and Project Name" ,,"Year:","Please select a Year" ,,"Month:","Please select a Month" ,,"Fields","Data (Entered in $K) [Data Entry field]" ,,"BCWS ($K):",0 ,,"BCWP ($K):",0 ,,"ACWP ($K):",0 ,,"Management Reserves Remaining ($K):",0 ,,"Percent Complete (%):",0 ,,"Instructions" ,,"1. Log into PARS II" ,,"2. Select the appropriate Project" ,,"3. While still on the Projects screen, click on ""Attachments""" ,,"4. Click on ""Add"""

274

Interim Stabilization Equipment Essential and Support Drawing Plan  

SciTech Connect

The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

KOCH, M.R.

1999-10-22T23:59:59.000Z

275

Interim Stabilization Equipment Essential and Support Drawing Plan  

Science Conference Proceedings (OSTI)

The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a].

HORNER, T.M.

2000-10-16T23:59:59.000Z

276

Method of preparing nuclear wastes for tansportation and interim storage  

SciTech Connect

Nuclear waste is formed into a substantially water-insoluble solid for temporary storage and transportation by mixing the calcined waste with at least 10 weight percent powdered anhydrous sodium silicate to form a mixture and subjecting the mixture to a high humidity environment for a period of time sufficient to form cementitious bonds by chemical reaction. The method is suitable for preparing an interim waste form from dried high level radioactive wastes.

Bandyopadhyay, Gautam (Naperville, IL); Galvin, Thomas M. (Darien, IL)

1984-01-01T23:59:59.000Z

277

Risk-Managed Technical Specifications (RMTS) Guidelines: Interim Development Report  

Science Conference Proceedings (OSTI)

This report presents nuclear utilities with a technical framework and associated general guidance for implementation of risk-managed technical specifications (RMTS) as a partial replacement for existing conventional plant technical specifications. This interim report, intended for both Westinghouse and non-Westinghouse reactor plants and for future reference and application by the Nuclear Energy Institute (NEI), will probably be updated in the future as risk-informed applications technology continues to ...

2003-11-21T23:59:59.000Z

278

105-H Reactor Interim Safe Storage Project Final Report  

SciTech Connect

The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

E.G. Ison

2008-11-08T23:59:59.000Z

279

Duke Energy Notrees Wind Storage Demonstration Project: 2013 Interim Report  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) technical update is an interim report summarizing the status of Duke Energy’s Notrees Wind Storage Demonstration Project, which involves integrating a 36-MW battery energy storage system (BESS) from Xtreme Power with the152.6-MW Notrees Wind Farm. Xtreme Power’s solid lead-acid battery represents one of an emerging number of energy storage devices endowed with the potential to serve multiple value-added utility applications. ...

2013-12-19T23:59:59.000Z

280

Report on interim storage of spent nuclear fuel  

SciTech Connect

The report on interim storage of spent nuclear fuel discusses the technical, regulatory, and economic aspects of spent-fuel storage at nuclear reactors. The report is intended to provide legislators state officials and citizens in the Midwest with information on spent-fuel inventories, current and projected additional storage requirements, licensing, storage technologies, and actions taken by various utilities in the Midwest to augment their capacity to store spent nuclear fuel on site.

1993-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Interim Storage of Hanford Spent Fuel & Associated Sludge  

SciTech Connect

The Hanford site is currently dealing with a number of types of Spent Nuclear Fuel. The route to interim dry storage for the various fuel types branches along two different paths. Fuel types such as metallic N reactor fuel and Shippingport Core 2 Blanket assemblies are being placed in approximately 4 m long canisters which are then stored in tubes below grade in a new canister storage building. Other fuels such as TRIGA{trademark} and Light Water Reactor fuel will be relocated and stored in stand-alone casks on a concrete pad. Varying degrees of sophistication are being applied with respect to the drying and/or evacuation of the fuel interim storage canisters depending on the reactivity of the fuel, the degree of damaged fuel and the previous storage environment. The characterization of sludge from the Hanford K Basins is nearly complete and canisters are being designed to store the sludge (including uranium particles from fuel element cleaning) on an interim basis.

MAKENAS, B.J.

2002-07-01T23:59:59.000Z

282

Interim Report on Uranium Metal Segregation Testing  

SciTech Connect

This report describes the preliminary results of laboratory and bench-scale vendor testing to evaluate the effectiveness of the gravity mineral concentration technology for removing and concentrating uranium metal from K Basin sludge.

Schmidt, Andrew J.; Elmore, Monte R.

2004-04-18T23:59:59.000Z

283

Interim Guidelines for In Situ Visual Inspection of Inlet and Outlet Turbine Stages: Part 2: Experiences, Approaches and Improvement s in Remote Visual Inspection  

Science Conference Proceedings (OSTI)

In situ inspection of steam turbine rotors will minimize the length of planned outages by reducing the amount of equipment disassembly required. This interim report provides a state-of-the-art review of in situ visual inspection of steam turbine rotors, also known as remote visual inspection (RVI). The report also proposes an approach for the next phase of this project, which will promote not only application of RVI technology but also delivery of advanced nondestructive evaluation (NDE) equipment to cri...

2000-05-22T23:59:59.000Z

284

Optimal partitioned fault-tolerant bus layout for reducing power in nanometer designs  

Science Conference Proceedings (OSTI)

As technology scales down to nanometer dimensions, coupling capacitances between adjacent bus wires grow rapidly, and have a significant impact on power consumption and signal integrity of an integrated circuit. As buses are major components of a design, ... Keywords: coupling capacitance, fault-tolerant, low power, reliability

Shanq-Jang Ruan; Edwin Naroska; Chun-Chih Chen

2006-04-01T23:59:59.000Z

285

Orbital disc insulator for SF.sub.6 gas-insulated bus  

DOE Patents (OSTI)

An insulator for supporting a high voltage conductor within a gas-filled grounded housing consists of radially spaced insulation rings fitted to the exterior of the bus and the interior of the grounded housing respectively, and the spaced rings are connected by trefoil type rings which are integrally formed with the spaced insulation rings.

Bacvarov, Dosio C. (Greensburg, PA); Gomarac, Nicholas G. (West Newton, PA)

1977-01-01T23:59:59.000Z

286

IAC-09.C3.2.8 A REDUNDANT POWER BUS FOR  

E-Print Network (OSTI)

. The idea behind the proposed Power Bus is to have power conversion (from solar panels) and power storage") which contain, each: a solar panel; energy storage batteries with the corresponding power converters in a distributed way. For instance: i) accumulating the power from all solar panels towards the load(s); ii

287

High voltage bus and auxiliary heater control system for an electric or hybrid vehicle  

DOE Green Energy (OSTI)

A control system for an electric or hybrid electric vehicle includes a vehicle system controller and a control circuit having an electric immersion heater. The heater is electrically connected to the vehicle's high voltage bus and is thermally coupled to a coolant loop containing a heater core for the vehicle's climate control system. The system controller responds to cabin heat requests from the climate control system by generating a pulse width modulated signal that is used by the control circuit to operate the heater at a duty cycle appropriate for the amount of cabin heating requested. The control system also uses the heater to dissipate excess energy produced by an auxiliary power unit and to provide electric braking when regenerative braking is not desirable and manual braking is not necessary. The control system further utilizes the heater to provide a safe discharge of a bank of energy storage capacitors following disconnection of the battery or one of the high voltage connectors used to transmit high voltage operating power to the various vehicle systems. The control circuit includes a high voltage clamping circuit that monitors the voltage on the bus and operates the heater to clamp down the bus voltage when it exceeds a pre-selected maximum voltage. The control system can also be used to phase in operation of the heater when the bus voltage exceeds a lower threshold voltage and can be used to phase out the auxiliary power unit charging and regenerative braking when the battery becomes fully charged.

Murty, Balarama Vempaty (West Bloomfield, MI)

2000-01-01T23:59:59.000Z

288

Optimized Parameter Matching Method of Plug-in Series Hybrid Electric Bus  

Science Conference Proceedings (OSTI)

This research attempts to deal with the coupling-influence among different powertrain parameters in the parameter matching process of Plug-in Series Hybrid Electric Bus(PSHEB), the research target is a PSHEB (with no gearbox) which is currently under ... Keywords: Plug-in, hybrid electric vehicle, parameter matching, Matlab simulation

Kai Xu, Bin Qiu

2012-12-01T23:59:59.000Z

289

Bus Research and Testing Program Heavy-duty Chassis Dynamometer and Emissions Testing Facility  

E-Print Network (OSTI)

Bus Research and Testing Program Heavy-duty Chassis Dynamometer and Emissions Testing Facility, hydrocarbons and carbon dioxide from transit buses and heavy-duty vehicles when they are tested on simulated includes a heavy-duty chassis dynamometer, required for conducting these tests, as well as a heavy

Lee, Dongwon

290

Investigating the electric power distribution system (EPDS) bus voltage in the presence of distributed generation (DG)  

Science Conference Proceedings (OSTI)

This paper investigates the Electric Power Distribution System (EPDS) bus voltage in the presence of Distributed Generation (DG). Distribution Company's (Discos) planner endeavor to develop new planning strategies for their network in order to serve ... Keywords: PSCAD, distributed generation, electric power distribution system, islanding, power quality, voltage stability

Hasham Khan; Mohammad Ahmad Choudhry; Tahir Mahmood; Aamir Hanif

2006-04-01T23:59:59.000Z

291

Extensions to wireless M-Bus protocol for smart metering and smart grid application  

Science Conference Proceedings (OSTI)

Smart metering and smart grid applications are rapidly finding their place in the market in order to improve the provisioning process efficiency of electricity, gas, water and heat. The usage of communication technologies is a major stepping stone for ... Keywords: optimization, smart grid, smart metering, wireless M-Bus

Axel Sikora; Pancraç Villalonga; Klaus Landwehr

2012-08-01T23:59:59.000Z

292

Solar water heater lease program. Interim report  

SciTech Connect

The Solar Water Heater Lease Program consists of the installation and leasing of ten solar systems to central Illinois homeowners. The measured energy savings to the homeowners and the impact of such systems on energy production requirements are studied. Each homeowner collects data on the gallons of hot water used, electricity used to heat water, and the temperatures of the cold and hot water outlet temperatures at the sink. The data are presented and conclusions are drawn, including the optimum slope of the collector, comparison of the actual hot water consumption and the estimated consumption, evaluation of the effects of temperature settings of the non-solar water heater, and the percentage of the energy provided for hot water by the solar system. The monitoring procedures and results are evaluated. Recommendations for improving the solar hot water systems are presented. (LEW)

1982-01-01T23:59:59.000Z

293

Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)  

SciTech Connect

The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

Burgard, K.C.

1998-04-09T23:59:59.000Z

294

Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)  

SciTech Connect

The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

Burgard, K.C.

1998-06-02T23:59:59.000Z

295

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action  

E-Print Network (OSTI)

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action Page 1 of 10 SB 4 INTERIM WELL STIMULATION TREATMENT REGULATIONS NOTICE OF PROPOSED EMERGENCY that the California Department of Conservation (Department) proposes to adopt emergency regulations necessary

296

Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update  

SciTech Connect

The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility.

L. V. Street

2007-04-01T23:59:59.000Z

297

EIS-0283-S2: Amended Interim Action Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0283-S2: Amended Interim Action Determination EIS-0283-S2: Amended Interim Action Determination EIS-0283-S2: Amended Interim Action Determination Disposition of Certain Plutonium Materials at the K-Area Complex, Savannah River Site DOE has reviewed the environmental analysis relevant to preparation for disposition in the HB-Line and K-Area at SRS, and disposal at WIPP, approximately 500 kg of surplus, non-pit plutonium. DOE finds that the analysis in the Interim Management of Nuclear Material EIS and the SRS Waste Management EIS are still representative of the impacts of disposal of these materials. Therefore, no adverse environmental impacts would result from disposal of these materials as TRU waste to WIPP and this action is clearly an allowable interim action in accordance with DOE regulations

298

Comments of NRDC on Department of Energy Interim Final Rule: Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

NRDC on Department of Energy Interim Final Rule: Energy NRDC on Department of Energy Interim Final Rule: Energy Conservation for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings Comments of NRDC on Department of Energy Interim Final Rule: Energy Conservation for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings NRDC's comments on Interim Final Rule: Energy Conservation for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings Comments of NRDC on Department of Energy Interim Final Rule: Energy Conservation for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings

299

Microsoft Word - Policy_Flash_09_01_Interim_Certification.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JANUARY 16, 2009 JANUARY 16, 2009 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PMCDP CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Interim Certification The Project Management Career Development Program (PMCDP) Certification Review Board (CRB) established a new process whereby candidates with strong project management experience from outside the Department, hired into project director positions, may be granted an interim PMCDP certification. Interim certification allows the federal employee to act as a certified federal project director. Interim certifications are granted by the sponsoring CRB member, or their designee. If the sponsoring program office is not a voting member of the CRB, the Office of Engineering and Construction Management will act as the grantor of interim certification.

300

Microsoft Word - HZEB_Retail_InterimReport_Final.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

! ! ! Healthy!Zero!Energy!Buildings!(HZEB)!Program-! ! ! Interim!Report!on!Cross"Sectional!Study!of!Contaminant!! ! ! Levels,!Source!Strengths,!and!Ventilation!Rates!in!Retail!Stores! ! ! ! ! Wanyu!R.!Chan,!Meera!Sidheswaran,!Douglas!Sullivan,!! ! ! Sebastian!Cohn,!William!J.!Fisk!! ! ! ! Environmental!Energy!Technologies!Division! ! ! Indoor!Environment!Group! ! ! Lawrence!Berkeley!National!Laboratory! ! ! Berkeley,!CA!94720! ! ! ! ! ! ! ! ! ! ! November!5,!2012! ! ! ! ! ! ! ! ! ! ! The!research!reported!here!was!supported!by!the!California!Energy!Commission! ! ! Public!Interest!Energy!Research!Program,!Energy"Related!Environmental!! ! ! Research!Program,!award!number!500"09"049.!!The!project!was!also!supported! ! ! by!the!U.S.!Dept.!of!Energy!Building!Technologies!Program,!Office!of!Energy!

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

US PRACTICE FOR INTERIM WET STORAGE OF RRSNF  

DOE Green Energy (OSTI)

Aluminum research reactor spent nuclear fuel is currently being stored or is anticipated to be returned to the United States and stored at Department of Energy storage facilities at the Savannah River Site and the Idaho Nuclear Technology and Engineering Center. This paper summarizes the current practices to provide for continued safe interim wet storage in the U.S. Aluminum fuel stored in poor quality water is subject to aggressive corrosion attack and therefore water chemistry control systems are essential to maintain water quality. Fuel with minor breaches are safely stored directly in the basin. Fuel pieces and heavily damaged fuel is safely stored in isolation canisters.

Vinson, D.

2010-08-05T23:59:59.000Z

302

Interim Storage of Greater Than Class C Low Level Waste  

Science Conference Proceedings (OSTI)

This report serves as a guideline for the safe, interim, on-site storage of low level radioactive waste (LLW) that exceeds the activity limitations for near-surface disposal set forth in 10 CFR 61.55. This waste, referred to as greater than Class C (GTCC) waste, exceeds the Class C limits in the referenced regulation. At the present time, there is no licensed disposal facility for GTCC waste in the United States. This situation forces commercial nuclear reactors to store it on site until a disposal facil...

2001-11-12T23:59:59.000Z

303

Expedited approach to a carbon tetrachloride spill interim remedial action  

Science Conference Proceedings (OSTI)

Monitored natural attenuation was selected as an interim measure for a carbon tetrachloride spill site where source removal or in situ treatment cannot currently be implemented due to the surrounding infrastructure. Rather than delay action until the site is more accessible to an interim action, this more expedited approach would support a final action. Individual Hazard Substance Site (IHSS) 118.1 is a former underground storage tank at Rocky Flats Environmental Technology Site (RFETS) that stored carbon tetrachloride for process use. Inadvertent releases associated with filling and failure of the tank system resulted in an accumulation of carbon tetrachloride in a bedrock depression around a group of former process waste tanks. Access to the source of contamination is obstructed by numerous utilities, the process waste tanks, and other components of the site infrastructure that limit the ability to conduct an effective remedial action. A preremedial field investigation was conducted in September 1997 to identify and delineate the extent of the dense nonaqueous phase liquid (DNAPL) in the subsurface. Data collected from the investigation revealed that natural processes might be limiting the migration of contaminants from the source area.

Cowdery, C.; Primrose, A. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Uhland, J. [Kaiser-Hill, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

304

The potential for bus rapid transit to promote transit oriented development : an analysis of BRTOD in Ottawa, Brisbane, and Pittsburgh  

E-Print Network (OSTI)

This thesis explores the conditions under which bus rapid transit (BRT) can promote transit oriented development (TOD). At a time when cities throughout the U.S. are searching for methods to reduce road congestion and limit ...

Judy, Meredith H. (Meredith Hampton)

2007-01-01T23:59:59.000Z

305

All Other Editions Are Obsolete U.S. Department of Energy Shuttle Bus Passenger List  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

511.1 511.1 (02-94) All Other Editions Are Obsolete U.S. Department of Energy Shuttle Bus Passenger List Date: Time: Bus Number: Driver's Signature: The U.S. Department of Energy (DOE) Shuttle operates Express between the Germantown Building and the Washington Office (Forrestal Building). ICC regulations prohibits en-route stops. The information being collected below is for the purpose of identifying individuals utilizing DOE Shuttle service. It is not retrievable by a personal identifier and is, therefore, not being kept in a Privacy Act system of records. Official Government Travelers I certify that travel on this trip is for Official Government business. (Please print all information) Name: (First/Last) Office Symbol or Agency Duty Station 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

306

Multilevel-Dc-Bus Inverter For Providing Sinusoidal And Pwm Electrical Machine Voltages  

DOE Patents (OSTI)

A circuit for controlling an ac machine comprises a full bridge network of commutation switches which are connected to supply current for a corresponding voltage phase to the stator windings, a plurality of diodes, each in parallel connection to a respective one of the commutation switches, a plurality of dc source connections providing a multi-level dc bus for the full bridge network of commutation switches to produce sinusoidal voltages or PWM signals, and a controller connected for control of said dc source connections and said full bridge network of commutation switches to output substantially sinusoidal voltages to the stator windings. With the invention, the number of semiconductor switches is reduced to m+3 for a multi-level dc bus having m levels. A method of machine control is also disclosed.

Su, Gui-Jia (Knoxville, TN)

2005-11-29T23:59:59.000Z

307

{open_quotes}Secure Bus{close_quotes} disturbance-free power at the utility substation level  

Science Conference Proceedings (OSTI)

Over the last 18 months Public Service Company of New Mexico (PNM), El Camino Real Engineering, Inc. (CRE), Los Alamos National Laboratory (LANL) and Sandia National Laboratories (SNL) have worked on the development of disturbance-free power at the medium voltage substation level. The work resulted in the Secure Bus concept, a system in which a medium voltage bus in a substation is immune to power outages and voltage sags on the utility source. The Secure Bus voltage is also immune to voltage sags resulting from faults on any distribution feeder connected to the bus. The Secure Bus concept originated from work conducted to improve power quality for large high-tech manufacturing facilities, in particular for large semiconductor manufacturing plants. For the demands on quality power of a modern facility conventional equipment is not adequate for protecting the end user. For example, the operation of conventional vacuum breakers during short circuit conditions on a feeder circuit, requiring 3 to 5 cycles for breaker opening, does not allow for fast enough current interruption to avoid a voltage dip on the main bus. A sever voltage sag could result in a shut down of sensitive equipment being supplied by the other feeder circuits, which are connected to the main bus. The circumvent the problem, a fast breaker was introduced which interrupts the short circuit before the current causes a significant voltage disturbance. To make the bus immune also to power disturbances caused by power outages, energy storage is introduced to provide the necessary energy back-up in case the primary source is not available.

Boenig, H.J. [Los Alamos National Lab., NM (United States); Jones, W.H. [El Camino Real Engineering, Inc., Corrales, NM (United States)

1996-12-01T23:59:59.000Z

308

DOE/EIA-0193/P PRELIMINARY CONSERVATION TABLES FROM THE NATIONAL INTERIM ENERGY CONSUMPTION SURVEY  

U.S. Energy Information Administration (EIA) Indexed Site

193/P 193/P PRELIMINARY CONSERVATION TABLES FROM THE NATIONAL INTERIM ENERGY CONSUMPTION SURVEY OFFICE OF THE CONSUMPTION DATA SYSTEM OFFICE OF PROGRAM DEVELOPMENT ENERGY INFORMATION ADMINISTRATION AUGUST 1, 1979 PRELIMINARY CONSERVATION TABLES FROM THE NATIONAL INTERIM ENERGY CONSUMPTION SURVEY Attached is the first report of the Office of the Consumption Data System, Office of Program Development, Energy Information Administration, presenting preliminary data from the National Interim Energy Consumption Survey (NIECS). The focus of this report is the conservation activities performed by households since January 1977, and the status of households with respect to insulation, storm windows, and other energy conserving characteristics. These tables are from preliminary data files.

309

High voltage bus and auxiliary heater control system for an electric or hybrid vehicle  

DOE Patents (OSTI)

A control system for an electric or hybrid electric vehicle includes a vehicle system controller and a control circuit having an electric immersion heater. The heater is electrically connected to the vehicle's high voltage bus and is thermally coupled to a coolant loop containing a heater core for the vehicle's climate control system. The system controller responds to cabin heat requests from the climate control system by generating a pulse width modulated signal that is used by the control circuit to operate the heater at a duty cycle appropriate for the amount of cabin heating requested. The control system also uses the heater to dissipate excess energy produced by an auxiliary power unit and to provide electric braking when regenerative braking is not desirable and manual braking is not necessary. The control system further utilizes the heater to provide a safe discharge of a bank of energy storage capacitors following disconnection of the battery or one of the high voltage connectors used to transmit high voltage operating power to the various vehicle systems. The control circuit includes a high voltage clamping circuit that monitors the voltage on the bus and operates the heater to clamp down the bus voltage when it exceeds a pre-selected maximum voltage. The control system can also be used to phase in operation of the heater when the bus voltage exceeds a lower threshold voltage and can be used to phase out the auxiliary power unit charging and regenerative braking when the battery becomes fully charged.

Murty, Balarama Vempaty (West Bloomfield, MI)

2000-01-01T23:59:59.000Z

310

Set up DataBus as a system service? | OpenEI Community  

Open Energy Info (EERE)

Set up DataBus as a system service? Set up DataBus as a system service? Home > Groups > Databus What is the recommended way to configure a system service for DataBus? My old-skool approach would be to write a script in /etc/init.d/ . Are there specific recommendations or requirements for the start & stop commmands? thanks, Submitted by Hopcroft on 6 August, 2013 - 14:33 1 answer Points: 0 The start command would be just like the runProduction.sh script found in databus/webapp directory though you probably want to log the pid. echo $! > pid.file and the stop script can use the pid to kill {pid} using the pid from that file. The webservers are stateless so killing them is is not a big deal...there is nothing they need to cleanup. Deanhiller on 7 August, 2013 - 06:14 Groups Menu You must login in order to post into this group.

311

Set up DataBus as a system service? | OpenEI Community  

Open Energy Info (EERE)

Set up DataBus as a system service? Set up DataBus as a system service? Home > Groups > Databus What is the recommended way to configure a system service for DataBus? My old-skool approach would be to write a script in /etc/init.d/ . Are there specific recommendations or requirements for the start & stop commmands? thanks, Submitted by Hopcroft on 6 August, 2013 - 14:33 1 answer Points: 0 The start command would be just like the runProduction.sh script found in databus/webapp directory though you probably want to log the pid. echo $! > pid.file and the stop script can use the pid to kill {pid} using the pid from that file. The webservers are stateless so killing them is is not a big deal...there is nothing they need to cleanup. Deanhiller on 7 August, 2013 - 06:14 Groups Menu You must login in order to post into this group.

312

The effect of magnetic field on optimal design of a rigid-bus substation  

SciTech Connect

Substation rigid-bus design involves electrical, mechanical, and structural considerations. In order to integrate these considerations into one document, IEEE in cooperation with ANSI has issued a comprehensive guide for design of substation rigid-bus systems. The design process based on this guide involves substantial manual effort to integrate all types of calculations. This is particularly evident when the computations have to be repeated several times in order to arrive at a more economic design. In an earlier paper the authors presented a mathematical model and computer program which automates the design process. Recently there has been concern expressed about the possible biological effects of low level magnetic fields. In view of this, a new design constraint taking into account the limits imposed on the magnitude of the magnetic field can be added to the design guidelines. In this paper the authors introduce such a constraint and they show how the magnitude of allowable magnetic field at a specified distance from the station buses affects the optimal design of a rigid bus substation.

Anders, G.J.; Ford, G.L.; Horrocks, D.J. (Ontario Hydro, Toronto, Ontario (Canada))

1994-07-01T23:59:59.000Z

313

Residential energy demand modeling and the NIECS data base : an evaluation  

E-Print Network (OSTI)

The purpose of this report is to evaluate the 1978-79 National Interim Energy Consumption Survey (NIECS) data base in terms of its usefulness for estimating residential energy demand models based on household appliance ...

Cowing, Thomas G.

1982-01-01T23:59:59.000Z

314

Guidance For Preparatioon of Basis For Interim Operation (BIO) Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3011-2002 3011-2002 December 2002 Superceding DOE-STD-3011-94 November 1994 DOE STANDARD GUIDANCE FOR PREPARATION OF BASIS FOR INTERIM OPERATION (BIO) DOCUMENTS U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-3011-2002 ii This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161;

315

Savannah River Operations Office Interim Management of Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Federal Register / Vol. 62, No. 70 / Friday, April 11, 1997 / Notices 1 The term ''failed'' means that the cladding on the fuel has been breached. The ROD, 60 Fed. Reg. 65300 (December 19, 1995), stated that failed fuel is indicated by gas releases from a fuel storage canister or visible failure of the cladding or canisters. select samples for specialized surveys for example on children's services or on access for persons with disabilities. [FR Doc. 97-9341 Filed 4-10-97; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF ENERGY Savannah River Operations Office Interim Management of Nuclear Materials at the Savannah River Site AGENCY: Department of Energy. ACTION: Supplemental record of decision and supplement analysis determination. SUMMARY: The U.S. Department of Energy (DOE) prepared a final

316

OE/EIA-0272 The National Interim Energy Consumption Survey:  

U.S. Energy Information Administration (EIA) Indexed Site

272 272 The National Interim Energy Consumption Survey: Exploring the Variability in Energy Consumption July 1981 U.S. Department of Energy Energy Information Administration Assistant Administrator for Program Development Office of the Consumption Data System Industrial Data Systems Division This publication is available from the Superintendent of Documents, U.S. Government Printing Office, at the following address: Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402 Order Desk: (202) 783-3238 Stock Number: 061-003-00205-6 Price: $4.25 For questions on energy statistics or information on availability of other EIA publications, contact: National Energy Information Center, El-20 Forrestal Building U.S. Department of Energy Washington, D.C. 20585

317

Advanced nuclear reactor public opinion project. Interim report  

SciTech Connect

This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

Benson, B.

1991-07-25T23:59:59.000Z

318

National Interim Energy-Consumption Survey. Part VI. Energy assessment  

Science Conference Proceedings (OSTI)

The goal of energy assessment of the housing unit is to obtain physical information which can be combined with other survey results to give a more complete picture of the residential environment. A limited pretest of an energy assessment procedure was carried out in April-June 1979 with a subsample of 44 households that had been originally interviewed in the National Interim Energy Consumption Survey. In order to gain experience under a variety of environmental conditions, the pretest sites included locations in the Northeast, North Central, and South regions. As developed for the pretest, the energy assessment was a 90-minute inspection of the housing unit by a trained technician. Data collected during the inspection included square footage of the unit; age, make, and characteristics of appliances; insulation characteristics, characteristics of siting and apertures; and detailed information on the heating and cooling systems in the unit. The report describes the data collection procedures for the pretest.

Not Available

1981-01-01T23:59:59.000Z

319

Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report  

Science Conference Proceedings (OSTI)

This report outlines the design and total estimated cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW).

Pickett, W.W.

1998-03-02T23:59:59.000Z

320

N Reactor Placed In Interim Safe Storage: Largest Hanford Reactor Cocooning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N Reactor Placed In Interim Safe Storage: Largest Hanford Reactor N Reactor Placed In Interim Safe Storage: Largest Hanford Reactor Cocooning Project Now Complete N Reactor Placed In Interim Safe Storage: Largest Hanford Reactor Cocooning Project Now Complete June 14, 2012 - 12:00pm Addthis Media Contacts Cameron Hardy Cameron.Hardy@rl.doe.gov 509-376-5365 Mark McKenna mmckenna@wch-rcc.com 509-372-9032 RICHLAND, WASH. - The U.S. Department of Energy's (DOE's) River Corridor contractor, Washington Closure Hanford, has completed placing N Reactor in interim safe storage, a process also known as "cocooning." N Reactor was the last of nine plutonium production reactors to be shut down at DOE's Hanford Site in southeastern Washington state. It was Hanford's longest-running reactor, operating from 1963 to 1987. "In the 1960's, N Reactor represented the future of energy in America.

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

File:Cwa-401-handbook-2010-interim.pdf | Open Energy Information  

Open Energy Info (EERE)

Login | Sign Up Search File Edit History Facebook icon Twitter icon File:Cwa-401-handbook-2010-interim.pdf Jump to: navigation, search File File history File usage Metadata...

322

Basis for Interim Operation for the K-Reactor in Cold Standby  

SciTech Connect

The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

Shedrow, B.

1998-10-19T23:59:59.000Z

323

Evaluation of Orion/BAE Hybrid Buses and Orion CNG Buses at New York City Transit: Preprint  

DOE Green Energy (OSTI)

This paper prepared for the 2005 American Public Transportation Association Bus & Paratransit Conference discusses the NREL/DOE evaluation of hybrid electric transit buses operated by New York City Transit.

Eudy, L.; Barnitt, R.; Chandler, K.

2005-05-01T23:59:59.000Z

324

Interim Storage of Low and Intermediate Level Wastes: Guidelines for Extended Storage  

Science Conference Proceedings (OSTI)

Domestic utilities are responding to impending changes in low-level waste (LLW) disposal site facility availability by extending their capabilities for interim on-site storage of LLW. International utilities likewise face challenges in implementing complete low and intermediate waste disposal options. Therefore, our members asked EPRI to revise and update our series of documents devoted to on-site interim LLW storage. This report represents the key guidelines document for the series.

2002-10-30T23:59:59.000Z

325

Guidelines for Operating an Interim On Site Low Level Radioactive Waste Storage Facility - Revision 1  

Science Conference Proceedings (OSTI)

The majority of commercial USA nuclear stations have constructed on-site LLW storage facilities, and most of these same utilities are experiencing or have experienced at least one period of interim on-site storage. These Guidelines focus on operational considerations and incorporate many of the lessons learned while operating various types of LLW storage facilities. This document was reviewed by the USNRC. Subsequently, the USNRC issued RIS 2008-32, Interim LLRW Storage at NPPs, which recognizes the meth...

2009-02-23T23:59:59.000Z

326

Conceptual design statement of work for the immobilized low-activity waste interim storage facility project  

SciTech Connect

The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

Carlson, T.A., Fluor Daniel Hanford

1997-02-06T23:59:59.000Z

327

NREL Showcases Hydrogen Internal Combustion Engine Bus, Helps DOE Set Standards for Outreach (Fact Sheet), Hydrogen and Fuel Cell Technical Highlights (HFCTH)  

NLE Websites -- All DOE Office Websites (Extended Search)

557 * November 2010 557 * November 2010 NREL Showcases Hydrogen Internal Combustion Engine Bus, Helps DOE Set Standards for Outreach National Renewable Energy Laboratory (NREL) Teams: Hydrogen Education, Melanie Caton; Market Transformation, Michael Ulsh Accomplishment: NREL started using its Ford hydrogen-powered internal combustion engine (H 2 ICE) bus in May 2010 as the primary shuttle vehicle for VIP visitors, members of the media, and new employees. As the first national laboratory to receive such a bus, NREL

328

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

329

CNG and Diesel Transit Bus Emissions in Review  

DOE Green Energy (OSTI)

Over the past three years, the California Air Resources Board (CARB), in collaboration with the University of California and other entities, has investigated the tailpipe emissions from three different latemodel, in-use heavy-duty transit buses in five different configurations. The study has focused on the measurement of regulated emissions (NOX, HC, CO, total PM), other gaseous emissions (CO2, NO2, CH4, NMHC), a number of pollutants of toxic risk significance (aromatics, carbonyls, PAHs, elements), composition (elemental and organic carbon), and the physical characterization (size-segregated number count and mass) of the particles in the exhaust aerosol. Emission samples are also tested in a modified Ames assay. The impact of oxidation catalyst control for both diesel and compressed natural gas (CNG) buses and a passive diesel particulate filter (DPF) were evaluated over multiple driving cycles (idle, 55 mph cruise, CBD, UDDS, NYBC) using a chassis dynamometer. For brevity, only CBD results are discussed in this paper and particle sizing results are omitted. The database of results is large and some findings have been reported already at various forums including last year's DEER conference. The goal of this paper is to offer an overview of the lessons learned and attempt to draw overall conclusions and interpretations based on key findings to date.

Ayala, A. (a); Kado, N. (a,b); Okamoto, R. (a); Gebel, M. (a) Rieger, P. (a); Kobayashi, R. (b); Kuzmicky, P. (b)

2003-08-24T23:59:59.000Z

330

ThunderPower Bus Evaluation at SunLine Transit Agency  

E-Print Network (OSTI)

Source ............................. 30 Figure 2: Gasoline and CNG Prices by Gasoline Gallon Equivalent ................................................ 64 Figure 3: Diesel and CNG Prices by Diesel Gallon Equivalent ..................................................................... 102 Figure 5: Historical E85 Stations and E85 Sales Volume

331

SmartBRT: A Tool for Simulating, Visualizing, and Evaluating Bus Rapid Transit Systems  

E-Print Network (OSTI)

gas stationof building: Building and Gas Station. Texture is a picturelook like buildings or gas stations. Building type has front

VanderWerf, Joel

2005-01-01T23:59:59.000Z

332

Definition and Evaluation of Bus and Truck Automation Operations Concepts: Final Report  

E-Print Network (OSTI)

trucks Intermodal Rail 2.2 RELATED RESEARCH Research andrail) and the proponents of a more efficient freight system for national defense purposes. Research

Taso, H. S. Jacob; Botha, Jan L.

2003-01-01T23:59:59.000Z

333

Development of a Physics of Failure Model and Quantitative Assessment of the Fire Fatality Risk of Compressed Natural Gas Bus Cylinders.  

E-Print Network (OSTI)

??Title of Dissertation: DEVELOPMENT OF A PHYSICS OF FAILURE MODEL AND QUANTITATIVE ASSESSMENT OF THE FIRE FATALITY RISKS OF COMPRESSED NATURAL GAS BUS CYLINDERS The… (more)

Chamberlain, Samuel Seamore

2004-01-01T23:59:59.000Z

334

The value of distributed generation: The PVUSA grid-support project serving Kerman Substation. Interim report, April 1994  

DOE Green Energy (OSTI)

A common practice of electric utilities experiencing transmission and distribution (T and D) system overloads is to expand the substation, add lines, or upgrade equipment, all of which are capital intensive options. In 1988, it was hypothesized that strategically sited photovoltaics (PV) could benefit parts of T and D systems near or at overloaded conditions. An evaluation methodology was developed and applied to a test case (Kerman Substation near Fresno, California). Analytical results suggested that the value of PV to the T and D system could substantially exceed its energy and generation capacity value. The importance of this finding indicated the need for empirical validation. This led to the construction of a 0.5 MW PV demonstration plant by Pacific Gas and Electric Company (PG and E) at Kerman, California as part of the PVUSA (PV for Utility Scale Applications) project. PVUSA is a national public-private partnership that is assessing and demonstrating the viability of utility-scale photovoltaic electric generation systems. The Kerman PV plant, commissioned for commercial operation in June, 1993, is reported to be the first grid-support PV demonstration plant in the world. This Interim Report focuses on validating the technical aspects of grid-support PV. It provides interim validation results for four of the eight identified value components that stack up to make the ``value bar``, and compares them to 1992 Case Study estimates. Results are based on improved technical evaluation methodologies, measured plant performance under a variety of conditions, and long-term plant performance estimated using a validated computer simulation program. This report is not intended to be exhaustive in scope. It does, however, provide a thorough progress update of the validation project. Complete documentation of test procedures, data, and evaluation methods will be presented in the Final Report.

Hoff, T.; Wenger, H. [Pacific Energy Group (United States)

1994-07-01T23:59:59.000Z

335

Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

NONE

1995-06-01T23:59:59.000Z

336

Performance testing of aged hydrogen getters against criteria for interim safe storage of plutonium bearing materials.  

DOE Green Energy (OSTI)

Hydrogen getters were tested for use in storage of plutonium-bearing materials in accordance with DOE's Criteria for Interim Safe Storage of Plutonium Bearing Materials. The hydrogen getter HITOP was aged for 3 months at 70 C and tested under both recombination and hydrogenation conditions at 20 and 70 C; partially saturated and irradiated aged getter samples were also tested. The recombination reaction was found to be very fast and well above the required rate of 45 std. cc H2h. The gettering reaction, which is planned as the backup reaction in this deployment, is slower and may not meet the requirements alone. Pressure drop measurements and {sup 1}H NMR analyses support these conclusions. Although the experimental conditions do not exactly replicate the deployment conditions, the results of our conservative experiments are clear: the aged getter shows sufficient reactivity to maintain hydrogen concentrations below the flammability limit, between the minimum and maximum deployment temperatures, for three months. The flammability risk is further reduced by the removal of oxygen through the recombination reaction. Neither radiation exposure nor thermal aging sufficiently degrades the getter to be a concern. Future testing to evaluate performance for longer aging periods is in progress.

Shepodd, Timothy J.; Nissen, April; Buffleben, George M.

2006-01-01T23:59:59.000Z

337

Improving Ventilation and Saving Energy: Relocatable ClassroomField Study Interim Report  

Science Conference Proceedings (OSTI)

The primary goals of this research effort are to develop, evaluate, and demonstrate a very practical HVAC system for classrooms that consistently provides classrooms with the quantity of ventilation in current minimum standards, while saving energy, and reducing HVAC-related noise levels. This research is motivated by the public benefits of energy efficiency, evidence that many classrooms are under-ventilated, and public concerns about indoor environmental quality in classrooms. This report presents an interim status update and preliminary findings from energy and indoor environmental quality (IEQ) measurements in sixteen relocatable classrooms in California. The field study includes measurements of HVAC energy use, ventilation rates, and IEQ conditions. Ten of the classrooms were equipped with a new HVAC technology and six control classrooms were equipped with a standard HVAC system. Energy use and many IEQ parameters have been monitored continuously, while unoccupied acoustic measurements were measured in one of four planned seasonal measurement campaigns. Continuously monitored data are remotely accessed via a LonWorks{reg_sign} network and stored in a relational database at LBNL. Preliminary results are presented here.

Apte, Michael G.; Buchanan, Ian S.; Faulkner, David; Hotchi,Toshifumi; Spears,Michael; Sullivan, Douglas P.; Wang, Duo

2005-09-01T23:59:59.000Z

338

Interim test methods and procedures for determining the performance of small photovoltaic systems  

DOE Green Energy (OSTI)

This document provides test methods and procedures for determining the performance of small stand-alone and utility-grid connected PV systems. The procedures in this document provide a common approach for evaluating whether a given PV system is suitable to perform the function it was designed and manufactured to accomplish and meet the application load. This test document fills a testing void and provides the catalyst and focus for establishing the technical foundation and bridging the institutional barriers needed to reduce uncertainty that a system`s performance will be what its designers and builders claim. The need for this document was recently made more apparent with the initiation of a PV Global Approval Program (PVGAP) at the international level and is in response to concerns that PV systems being fielded must meet performance standards and that these standards include system-level performance type tests. The title of these test procedures is prefaced with the word interim because experience in using the procedures is needed before a consensus standard is developed and accepted by the PV community through its activities with the IEEE Standards Coordinating Committee 21 (SCC21) and International Electrotechnical Commission Technical Committee 82 (IEC TC82) national and international standards-making bodies. Both entities have initiated projects to develop test standards and will need the technical basis and validation of test procedures such as those presented in this document before a consensus is achieved by the PV community.

McNutt, P.; Kroposki, B.; Hansen, R.; DeBlasio, R.

1998-07-01T23:59:59.000Z

339

Evaluation of 2 Rem per Year Occupational Dose Limit: Potential Effects on U.S. Nuclear Utilities  

Science Conference Proceedings (OSTI)

This interim report provides an evaluation of potential impacts on the U.S. nuclear power industry of a reduction in the occupational radiation dose limit from 5 rem per year to 2 rem per year.

2006-12-22T23:59:59.000Z

340

Albany Interim Landfill gas extraction and mobile power system: Using landfill gas to produce electricity. Final report  

DOE Green Energy (OSTI)

The Albany Interim Landfill Gas Extraction and Mobile Power System project served three research objectives: (1) determination of the general efficiency and radius of influence of horizontally placed landfill gas extraction conduits; (2) determination of cost and effectiveness of a hydrogen sulfide gas scrubber utilizing Enviro-Scrub{trademark} liquid reagent; and (3) construction and evaluation of a dual-fuel (landfill gas/diesel) 100 kW mobile power station. The horizontal gas extraction system was very successful; overall, gas recovery was high and the practical radius of influence of individual extractors was about 50 feet. The hydrogen sulfide scrubber was effective and its use appears feasible at typical hydrogen sulfide concentrations and gas flows. The dual-fuel mobile power station performed dependably and was able to deliver smooth power output under varying load and landfill gas fuel conditions.

NONE

1997-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Data Report No. 2: NO{sub x} Adsorber Catalysts  

DOE Green Energy (OSTI)

The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NOx) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim report discusses the results of the DECSE test program that demonstrates the potential of NOx adsorber catalyst technology across the range of diesel engine operation with a fuel economy penalty less than 4%.

DOE; ORNL; NREL; EMA; MECA

1999-10-15T23:59:59.000Z

342

Life Cycle Inventory of Biodiesel and Petroleum Diesel for Use in an Urban Bus  

NLE Websites -- All DOE Office Websites (Extended Search)

SR-580-24089 UC Category 1503 SR-580-24089 UC Category 1503 Life Cycle Inventory of Biodiesel and Petroleum Diesel for Use in an Urban Bus A Joint Study Sponsored by: U.S. Department of Agriculture and U.S. Department of Energy Final Report May 1998 NOTICE NOTICE: This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees,

343

Compressed Natural Gas (CNG) Transit Bus Experience Survey: April 2009--April 2010  

Science Conference Proceedings (OSTI)

This survey was commissioned by the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) to collect and analyze experiential data and information from a cross-section of U.S. transit agencies with varying degrees of compressed natural gas (CNG) bus and station experience. This information will be used to assist DOE and NREL in determining areas of success and areas where further technical or other assistance might be required, and to assist them in focusing on areas judged by the CNG transit community as priority items.

Adams, R.; Horne, D. B.

2010-09-01T23:59:59.000Z

344

Evaluation of closure alternatives for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

The Bldg. 3001 Storage Canal at ORNL is leaking approximately 400 gal of water per day. This report presents the Bechtel National Inc. (BNI) Team's evaluation of plans and presents recommendations for interim closure alternatives to stop the release of radionuclides and potential release of heavy metals into the environment. This is a conceptual evaluation and does not include detailed engineering of physical mitigation methods. The alternatives address only interim closure measures and not final decommissioning of the canal.

Not Available

1992-02-01T23:59:59.000Z

345

CRADA Final Report for CRADA Number ORNL98-0521 : Development of an Electric Bus Inverter Based on ORNL Auxiliary Resonant Tank (ART) Soft-Switching Technology  

SciTech Connect

The Power Electronics and Electric Machinery Research Center (PEEMRC) of Oak Ridge National Laboratory (ORNL) has for many years been developing technologies for power converters for motor drives and many other applications. Some of the research goals are to improve efficiency and reduce audible and electromagnetic interference noise generation for inverters and the driven loads. The converters are being required to produce more power with reduced weight and volume, which requires improvements in heat removal from the electronics, as well as improved circuit designs that have fewer electrical losses. PEEMRC has recently developed and patented a soft-switching inverter topology called an Auxiliary Resonant Tank (ART), and this design has been tested and proven at ORNL using a 10-kW laboratory prototype. The objective of this project was to develop, test, and install the ART inverter technology in an electric transit bus with the final goal of evaluating performance of the ORNL inverter under field conditions in a vehicle. A scaled-up inverter with the capacity to drive a 22-e bus was built based on the 10-kW ORNL laboratory prototype ART soft-switching inverter. Most (if not all) commercially available inverters for traction drive and other applications use hard-switching inverters. A Cooperative Research and Development Agreement was established with the Chattanooga Area Regional Transit Authority (CARTA), the Electric Transit Vehicle Institute (ETVI), and Advanced Vehicle Systems (AVS), all of Chattanooga, along with ORNL. CARTA, which maintains and operates the public transit system in Chattanooga, provided an area for testing the vehicle alongside other similar vehicles in the normal operating environment. ETVI offers capabilities in standardized testing and reporting and also provides exposure in the electric transit vehicle arena for ORNL's technologies. The third Chattanooga partner, (AVS) manufactures all-electric and hybrid electric transit buses using inverter drive systems from several manufacturers. AVS provided help in field installation, and parts for laboratory testing. A 100-kW field-ready unit was developed, tested in an ORNL laboratory, and installed and successfully operated in a CARTA bus in Chattanooga. The tests on the vehicle were performed at a CARTA maintenance facility and at a l-mile test track in Chattanooga managed by CARTA.

Ayers, C.W.

2001-05-08T23:59:59.000Z

346

Lube Oil PdM, Handling, and Quality Assurance Guideline, Final Report: An Addendum to the Lube Oil PdM Handling and Quality Assuranc e Interim Guideline, Final Report  

Science Conference Proceedings (OSTI)

This report serves as an addendum to the interim guideline that was prepared by an EPRI team to assist the member utilities in the further improvement of maintenance processes by presenting, in detail, the Key Elements of conducting comprehensive evaluations of lubrication programs and the Key Elements of setting up a well-organized lubrication program. EPRI believes that improvements will yield optimal lubrication programs. This guideline addendum also serves as an excellent reference document in that i...

2004-12-21T23:59:59.000Z

347

International Programs and Agreements in Geothermal Energy. An Interim report  

DOE Green Energy (OSTI)

This report contains the interim results of a study for the Division of Geothermal Energy on the Division's international programs and activities. The complete research program, which is scheduled to be finished i November 1978, will have the following elements: (1) an assessment of objectives that have motivated the formulation of international programs and an explanation of any changes in the evolution of those programs. These objectives will be assessed for their internal consistency, degree of governmental consensus, their practicality, the current status of their accomplishments, and the implications of their accomplishments for the role of DGE. (2) An assessment of organizational structures and teams, including the identity of key decisionmakers, the nature of the interagency process, procedures for generating nongovernmental support for international programs and the success of these procedures, and the effectiveness of the interface with foreign partners. (3) Assessment of results of international cooperative programs, which involve the development of an overall balance sheet of benefits and disbenefits attributed to each international program. (4) The formulation of future international cooperative programs based on the assessments described. These programs may involve the development of new exchanges, alteration or elimination of existing exchanges, and revisions in the management of exchanges by US government agencies.

Oppenheimer, M.; Fein, E.; Bye, J.

1978-06-01T23:59:59.000Z

348

Interim technical status report for the COthane contract  

DOE Green Energy (OSTI)

Each year millions of tons of dilute carbon monoxide in industrial waste streams are flared or vented to the atmosphere. In order to recover this wasted source of energy, Union Carbide has developed the COthane process for the direct conversion of the dilute carbon monoxide in such streams to pipeline quality natural gas (SNG). A three phase program has been planned for the commercialization of the COthane process. Phase I will define the process details. Phase II will further test the process with an integrated pilot unit operating on industrial waste streams. Phase III will monitor the operation of the first commercial unit. The purpose of this interim report is to describe the preliminary work done under these five tasks during the first fourteen months of the contract. The bench scale pilot unit has been built and initial test runs started. New catalysts have been developed and tested which incorporate different matrixing agents, metal components, stabilizing agents, and synthesis techniques. Finally, the technical and economic studies have shown that, under certain optimistic conditions, a COthane unit handling blast furnace off-gas will produce SNG at $3.17/MM Btu. This cost is probably competitive with currently priced natural gas, and is certainly competitive with SNG produced by the Lurgi process.

Not Available

1979-12-01T23:59:59.000Z

349

Statistical Characterization of School Bus Drive Cycles Collected via Onboard Logging Systems  

Science Conference Proceedings (OSTI)

In an effort to characterize the dynamics typical of school bus operation, National Renewable Energy Laboratory (NREL) researchers set out to gather in-use duty cycle data from school bus fleets operating across the country. Employing a combination of Isaac Instruments GPS/CAN data loggers in conjunction with existing onboard telemetric systems resulted in the capture of operating information for more than 200 individual vehicles in three geographically unique domestic locations. In total, over 1,500 individual operational route shifts from Washington, New York, and Colorado were collected. Upon completing the collection of in-use field data using either NREL-installed data acquisition devices or existing onboard telemetry systems, large-scale duty-cycle statistical analyses were performed to examine underlying vehicle dynamics trends within the data and to explore vehicle operation variations between fleet locations. Based on the results of these analyses, high, low, and average vehicle dynamics requirements were determined, resulting in the selection of representative standard chassis dynamometer test cycles for each condition. In this paper, the methodology and accompanying results of the large-scale duty-cycle statistical analysis are presented, including graphical and tabular representations of a number of relationships between key duty-cycle metrics observed within the larger data set. In addition to presenting the results of this analysis, conclusions are drawn and presented regarding potential applications of advanced vehicle technology as it relates specifically to school buses.

Duran, A.; Walkowicz, K.

2013-10-01T23:59:59.000Z

350

EIS-0283-S2: Amended Interim Action Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certain Plutonium Materials at the K-Area Complex, Savannah Certain Plutonium Materials at the K-Area Complex, Savannah River Site DOE has reviewed the environmental analysis relevant to preparation for disposition in the HB-Line and K-Area at SRS, and disposal at WIPP, approximately 500 kg of surplus, non-pit plutonium. DOE finds that the analysis in the Interim Management of Nuclear Material EIS and the SRS Waste Management EIS are still representative of the impacts of disposal of these materials. Therefore, no adverse environmental impacts would result from disposal of these materials as TRU waste to WIPP and this action is clearly an allowable interim action in accordance with DOE regulations for implementing NEPA. EIS-0283-S2-Amended_IAD-2013.pdf More Documents & Publications EIS-0283-S2: Interim Action Determination

351

Request for Rehearing and Request for Interim Clarification by David K.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rehearing and Request for Interim Clarification by Rehearing and Request for Interim Clarification by David K. Paylor, Director of the Virginia Department of Environmental Quality Request for Rehearing and Request for Interim Clarification by David K. Paylor, Director of the Virginia Department of Environmental Quality Docket No. EO-05-01: Pursuant to Federal Power Act § 313, David K. Paylor, Director of the Virginia Department of Environmental Quality, through his counsel Robert F. McDonnell, the Attorney General of Virginia, requests rehearing of Order No. 202-05-3 entered by the Secretary of Energy on December 20, 2005. Specifically, Director Paylor requests rehearing based on the following assignments of error: 1. The Secretary erred by holding that the FPA preempts the Clean Air Act and related state laws;

352

Report to Congress on Plan for Interim Storage of Spent Nuclear Fuel from Decommissioned Reactors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites December 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Washington, D.C. Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel The picture on the cover is the Connecticut Yankee Independent Spent Fuel Storage Installation site in Haddam, Connecticut, with 43 dry storage NRC-licensed dual-purpose (storage and transport) casks. ii Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel EXECUTIVE SUMMARY The House Appropriations Committee Print that accompanied the Consolidated Appropriations Act, 2008, requests that the U.S. Department of Energy (the Department):

353

Interim Transmittal Letter dated July 27 2005 | U.S. DOE Office of Science  

Office of Science (SC) Website

Interim Transmittal Letter dated July 27 2005 Interim Transmittal Letter dated July 27 2005 High Energy Physics Advisory Panel (HEPAP) HEPAP Home Meetings Members .pdf file (20KB) Charges/Reports Charter .pdf file (44KB) HEP Committees of Visitors HEP Home Charges/Reports Interim Transmittal Letter dated July 27 2005 Print Text Size: A A A RSS Feeds FeedbackShare Page July 27, 2005 Harold T. Shapiro, Chair Sally Dawson, Vice Chair Elementary Particle Physics 2010 Committee The National Academies 500 Fifth Street, NW Washington, D.C. 20001 Dear Harold and Sally, Thank you again for your letter of March 15, 2005 to me as Chair of the High Energy Physics Advisory Panel (HEPAP) and for the opportunity to answer your questions about the International Linear Collider (ILC) along the broad themes of 1) the physics case, 2) the research and development

354

90-day Interim Report on Shale Gas Production - Secretary of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90-day Interim Report on Shale Gas Production - Secretary of Energy 90-day Interim Report on Shale Gas Production - Secretary of Energy Advisory Board 90-day Interim Report on Shale Gas Production - Secretary of Energy Advisory Board The Shale Gas Subcommittee of the Secretary of Energy Advisory Board is charged with identifying measures that can be taken to reduce the environmental impact and improve the safety of shale gas production. Natural gas is a cornerstone of the U.S. economy, providing a quarter of the country's total energy. Owing to breakthroughs in technology, production from shale formations has gone from a negligible amount just a few years ago to being almost 30 percent of total U.S. natural gas production. This has brought lower prices, domestic jobs, and the prospect of enhanced national security due to the potential of substantial

355

The Humboldt House-Rye Patch Geothermal District: An Interim View | Open  

Open Energy Info (EERE)

The Humboldt House-Rye Patch Geothermal District: An Interim View The Humboldt House-Rye Patch Geothermal District: An Interim View Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: The Humboldt House-Rye Patch Geothermal District: An Interim View Abstract The Humboldt House - Rye Patch Geothermal District extends about 6 miles along the northwestern flank of the Humboldt Range in Pershing County, Nevada and is composed of a number of geothermal cells. The northern Humboldt House portion of the district hosts hot wells and silicic sinter deposits extending from within the Humboldt Range, westward for at least four miles, out into the Humboldt River Valley. The southern Rye Patch portion of the District has scant surface geothermal features, and is identified from well data. Exploration in the District in the mid to late

356

Idaho Waste Vitrification Facilities Project Vitrified Waste Interim Storage Facility  

SciTech Connect

This feasibility study report presents a draft design of the Vitrified Waste Interim Storage Facility (VWISF), which is one of three subprojects of the Idaho Waste Vitrification Facilities (IWVF) project. The primary goal of the IWVF project is to design and construct a treatment process system that will vitrify the sodium-bearing waste (SBW) to a final waste form. The project will consist of three subprojects that include the Waste Collection Tanks Facility, the Waste Vitrification Facility (WVF), and the VWISF. The Waste Collection Tanks Facility will provide for waste collection, feed mixing, and surge storage for SBW and newly generated liquid waste from ongoing operations at the Idaho Nuclear Technology and Engineering Center. The WVF will contain the vitrification process that will mix the waste with glass-forming chemicals or frit and turn the waste into glass. The VWISF will provide a shielded storage facility for the glass until the waste can be disposed at either the Waste Isolation Pilot Plant as mixed transuranic waste or at the future national geological repository as high-level waste glass, pending the outcome of a Waste Incidental to Reprocessing determination, which is currently in progress. A secondary goal is to provide a facility that can be easily modified later to accommodate storage of the vitrified high-level waste calcine. The objective of this study was to determine the feasibility of the VWISF, which would be constructed in compliance with applicable federal, state, and local laws. This project supports the Department of Energy’s Environmental Management missions of safely storing and treating radioactive wastes as well as meeting Federal Facility Compliance commitments made to the State of Idaho.

Bonnema, Bruce Edward

2001-09-01T23:59:59.000Z

357

Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995/01eis0212_cl.html[6/27/2011 1:02:59 PM] 1995/01eis0212_cl.html[6/27/2011 1:02:59 PM] Final Environmental Impact Statement Safe Interim Storage Of Hanford Tank Wastes DOE/EIS-0212 VOLUME 1 OF 2 VOLUME 1 FINAL ENVIRONMENTAL IMPACT STATEMENT SAFE INTERIM STORAGE OF HANFORD TANK WASTES Hanford Site Richland, Washington October, 1995 WASHINGTON STATE DEPARTMENT OF ECOLOGY NUCLEAR WASTE PROGRAM LACEY, WASHINGTON 98503 U.S. DEPARTMENT OF ENERGY RICHLAND OPERATIONS OFFICE

358

Northeast Site Non-Aqueous Phase Liquids Interim Measures Progress Report October through December 2002  

Office of Legacy Management (LM)

700 700 GJO-2003-411-TAC GJO-PIN 13.5.1-1 Pinellas Environmental Restoration Project Northeast Site Non-Aqueous Phase Liquids Interim Measures Progress Report October through December 2002 January 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-02GJ79491 Task Order Number ST03-107 Document Number N0057700 Contents DOE/Grand Junction Office Northeast Site NAPL Interim Measures Progress Report January 2003 Page ii Contents Acronyms and Abbreviations ........................................................................................................ iii 1.0 Introduction ............................................................................................................................1

359

On 271 miles of Twin Cities-area roadways, bus drivers are allowed to operate their vehi-  

E-Print Network (OSTI)

Ferguson continued on page 2 Bus continued on page 3 Conference continued on page 2 Public-private of research at Reason Foundation, titled "P3s-- Public Private Partnerships? Or Peripatetic Pain in the Pants resources through the use of public-private partner- ships (P3s or PPPs) has become increasingly attractive

Minnesota, University of

360

Adaptive fuzzy regulation of the DC-bus capacitor voltage in a wind energy conversion system (WECS)  

Science Conference Proceedings (OSTI)

This paper proposes a new voltage regulator of the DC-bus capacitor of a variable speed wind power generation system based on adaptive fuzzy system. The change in the fuzzy rule base is done using a variable-structure direct adaptive control algorithm ... Keywords: Adaptive control, Fuzzy systems, Wind energy conversion systems

A. L. Elshafei; M. A. Azzouz

2011-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Finding of no significant impact: Interim storage of enriched uranium above the maximum historical level at the Y-12 Plant Oak Ridge, Tennessee  

SciTech Connect

The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) for the Proposed Interim Storage of Enriched Uranium Above the Maximum Historical Storage Level at the Y-12 Plant, Oak Ridge, Tennessee (DOE/EA-0929, September, 1994). The EA evaluates the environmental effects of transportation, prestorage processing, and interim storage of bounding quantities of enriched uranium at the Y-12 Plant over a ten-year period. The State of Tennessee and the public participated in public meetings and workshops which were held after a predecisional draft EA was released in February 1994, and after the revised pre-approval EA was issued in September 1994. Comments provided by the State and public have been carefully considered by the Department. As a result of this public process, the Department has determined that the Y-12 Plant-would store no more than 500 metric tons of highly enriched uranium (HEU) and no more than 6 metric tons of low enriched uranium (LEU). The bounding storage quantities analyzed in the pre-approval EA are 500 metric tons of HEU and 7,105.9 metric tons of LEU. Based on-the analyses in the EA, as revised by the attachment to the Finding of No Significant Impact (FONSI), DOE has determined that interim storage of 500 metric tons of HEU and 6 metric tons of LEU at the Y-12 Plant does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an Environmental Impact Statement (EIS) is not required and the Department is issuing this FONSI.

1995-12-01T23:59:59.000Z

362

Manifold, bus support and coupling arrangement for solid oxide fuel cells  

DOE Patents (OSTI)

Individual, tubular solid oxide fuel cells (SOFCs) are assembled into bundles called a module within a housing, with a plurality of modules arranged end-to-end in a linear, stacked configuration called a string. A common set of piping comprised of a suitable high temperature resistant material (1) provides fuel and air to each module housing, (2) serves as electrically conducting buses, and (3) provides structural support for a string of SOFC modules. Ceramic collars are used to connect fuel and air inlet piping to each of the electrodes in an SOFC module and provide (1) electrical insulation for the current carrying bus bars and gas manifolds, (2) damping for the fuel and air inlet piping, and (3) proper spacing between the fuel and air inlet piping to prevent contact between these tubes and possible damage to the SOFC. 11 figs.

Parry, G.W.

1988-04-21T23:59:59.000Z

363

Microsoft Word - CX-MalinBusFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Bob Trismen Project Manager - TEP-CSB-1 Proposed Action: Malin Substation relay equipment replacements PP&A Project No.: 2504 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic equipment Location: Klamath County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to replace bus differential relays and associated electronic equipment inside an existing building at the BPA Malin Substation. The replacements are scheduled to be completed in January 2013. Findings: BPA has determined that the proposed action complies with Section 1021.410 and

364

Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance  

Science Conference Proceedings (OSTI)

This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following completion of the deactivation project. The deactivation project has removed or stabilized the hazardous materials within the facility structure and equipment to reduce the hazards posed by the facility during the surveillance and maintenance (S and M) period, and to reduce the costs associated with the S and M. This document serves as the authorization basis for the PUREX facility, excluding the storage tunnels, railroad cut, and associated tracks, for the deactivated end state condition during the S and M period. The storage tunnels, and associated systems and areas, are addressed in WHC-SD-HS-SAR-001, Rev. 1, PUREX Final Safety Analysis Report. During S and M, the mission of the facility is to maintain the conditions and equipment in a manner that ensures the safety of the workers, environment, and the public. The S and M phase will continue until the final decontamination and decommissioning (D and D) project and activities are begun. Based on the methodology of DOE-STD-1027-92, Hazards Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, the final facility hazards category is identified as hazards category This considers the remaining material inventories, form and distribution of the material, and the energies present to initiate events of concern. Given the current facility configuration, conditions, and authorized S and M activities, there are no operational events identified resulting in significant hazard to any of the target receptor groups (e.g., workers, public, environment). The only accident scenarios identified with consequences to the onsite co-located workers were based on external natural phenomena, specifically an earthquake. The dose consequences of these events are within the current risk evaluation guidelines and are consistent with the expectations for a hazards category 2 facility.

DODD, E.N.

1999-05-12T23:59:59.000Z

365

Comparison of cask and drywell storage concepts for a monitored retrievable storage/interim storage system  

SciTech Connect

The Department of Energy, through its Richland Operations Office is evaluating the feasibility, timing, and cost of providing a federal capability for storing the spent fuel, high-level wastes, and transuranic wastes that DOE may be obligated by law to manage until permanent waste disposal facilities are available. Three concepts utilizing a monitored retrievable storage/interim storage (MRS/IS) facility have been developed and analyzed. The first concept, co-location with a reprocessing plant, has been developed by staff of Allied General Nuclear Services. the second concept, a stand-alone facility, has been developed by staff of the General Atomic Company. The third concept, co-location with a deep geologic repository, has been developed by the Pacific Northwest Laboratory with the assistance of the Westinghouse Hanford Company and Kaiser Engineers. The objectives of this study are: to develop preconceptual designs for MRS/IS facilities: to examine various issues such as transportation of wastes, licensing of the facilities, and environmental concerns associated with operation of such facilities; and to estimate the life-cycle costs of the facilities when operated in response to a set of scenarios that define the quantities and types of waste requiring storage in specific time periods, generally spanning the years 1989 to 2037. Three scenarios are examined to develop estimates of life-cycle costs for the MRS/IS facilities. In the first scenario, the reprocessing plant is placed in service in 1989 and HLW canisters are stored until a repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at intervals as needed to meet the demand. In the second scenario, the reprocessing plants are delayed in starting operations by 10 years, but the repositories open on schedule. In the third scenario, the repositories are delayed 10 years, but the reprocessing plants open on schedule.

Rasmussen, D.E.

1982-12-01T23:59:59.000Z

366

REVIEW OF FAST FLUX TEST FACILITY (FFTF) FUEL EXPERIMENTS FOR STORAGE IN INTERIM STORAGE CASKS (ISC)  

SciTech Connect

Appendix H, Section H.3.3.10.11 of the Final Safety Analysis Report (FSAR), provides the limits to be observed for fueled components authorized for storage in the Fast Flux Test Facility (FFTF) spent fuel storage system. Currently, the authorization basis allows standard driver fuel assemblies (DFA), as described in the FSAR Chapter 17, Section 17.5.3.1, to be stored provided decay power per assembly is {le} 250 watts, post-irradiation time is four years minimum, average assembly burn-up is 150,000 MWD/MTHM maximum and the pre-irradiation enrichment is 29.3% maximum (per H.3.3.10.11). In addition, driver evaluation (DE), core characterizer assemblies (CCA), and run-to-cladding-breach (RTCB) assemblies are included based on their similarities to a standard DFA. Ident-69 pin containers with fuel pins from these DFAs can also be stored. Section H.3.3.10.11 states that fuel types outside the specification criteria above will be addressed on a case-by-case basis. There are many different types of fuel and blanket experiments that were irradiated in the FFTF which now require offload to the spent fuel storage system. Two reviews were completed for a portion of these special type fuel components to determine if placement into the Core Component Container (CCC)/Interim Storage Cask (ISC) would require any special considerations or changes to the authorization basis. Project mission priorities coupled with availability of resources and analysts prevented these evaluations from being completed as a single effort. Areas of review have included radiological accident release consequences, radiological shielding adequacy, criticality safety, thermal limits, confinement, and stress. The results of these reviews are available in WHC-SD-FF-RPT-005, Rev. 0 and 1, ''Review of FFTF Fuel Experiments for Storage at ISA'', (Reference I), which subsequently allowed a large portion of these components to be included in the authorization basis (Table H.3.3-21). The report also identified additional components and actions in Section 3.0 and Table 3 that require further evaluation. The purpose of this report is to evaluate another portion of the remaining inventory (i.e., delayed neutron signal fuel, blanket assemblies, highly enriched assemblies, newly loaded Ident-69 pin containers, and returned fuel) to ensure it can be safely off loaded to the FFTF spent fuel storage system.

CHASTAIN, S.A.

2005-10-24T23:59:59.000Z

367

Interfacial Mixing in Viscous Pipe Flows Interim report to Imperial Oil  

E-Print Network (OSTI)

. Introduction The cost of energy to pump oil through a pipe line is greatly reduced if the ow is not turbulent in this area, in part, because oil companies have only recently considered pumping oil through pipesInterfacial Mixing in Viscous Pipe Flows Interim report to Imperial Oil D. Van Vliet and B. R

Sutherland, Bruce

368

Sample Results from the Interim Salt Disposition Program Macrobatch 6 Tank 21H Qualification Samples  

SciTech Connect

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 6 for the Interim Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 6 strategy are identified.

Peters, T. B.; Fink, S. D.

2012-12-11T23:59:59.000Z

369

Sample Results From The Interim Salt Disposition Program Macrobatch 6 Tank 21H Qualification Samples  

Science Conference Proceedings (OSTI)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 6 for the Interim Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 6 strategy are identified.

Peters, T. B.; Fink, S. D.

2012-12-20T23:59:59.000Z

370

Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program  

SciTech Connect

The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms.

TORRES, T.D.

2000-08-16T23:59:59.000Z

371

Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program  

Science Conference Proceedings (OSTI)

This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.

RUNG, M.P.

2000-06-20T23:59:59.000Z

372

Design Analysis Report for 244-AR Interim Stabilization Exhaust Ventilation Ducting  

SciTech Connect

This report documents the design analysis performed for the exhaust ducting associated with the 244-AR Interim Stabilization Project. The exhaust ducting connects portable exhausters PORO5 and PORO6 to the existing east dog house of the 291-AR filter vault and the vessel ventilation system. This analysis examines loads on the ductwork and ductwork supports.

RUTHERFORD, J.

2002-11-21T23:59:59.000Z

373

Interim Report: Air-Cooled Condensers for Next Generation Geothermal Power Plants Improved Binary Cycle Performance  

DOE Green Energy (OSTI)

As geothermal resources that are more expensive to develop are utilized for power generation, there will be increased incentive to use more efficient power plants. This is expected to be the case with Enhanced Geothermal System (EGS) resources. These resources will likely require wells drilled to depths greater than encountered with hydrothermal resources, and will have the added costs for stimulation to create the subsurface reservoir. It is postulated that plants generating power from these resources will likely utilize the binary cycle technology where heat is rejected sensibly to the ambient. The consumptive use of a portion of the produced geothermal fluid for evaporative heat rejection in the conventional flash-steam conversion cycle is likely to preclude its use with EGS resources. This will be especially true in those areas where there is a high demand for finite supplies of water. Though they have no consumptive use of water, using air-cooling systems for heat rejection has disadvantages. These systems have higher capital costs, reduced power output (heat is rejected at the higher dry-bulb temperature), increased parasitics (fan power), and greater variability in power generation on both a diurnal and annual basis (larger variation in the dry-bulb temperature). This is an interim report for the task ‘Air-Cooled Condensers in Next- Generation Conversion Systems’. The work performed was specifically aimed at a plant that uses commercially available binary cycle technologies with an EGS resource. Concepts were evaluated that have the potential to increase performance, lower cost, or mitigate the adverse effects of off-design operation. The impact on both cost and performance were determined for the concepts considered, and the scenarios identified where a particular concept is best suited. Most, but not all, of the concepts evaluated are associated with the rejection of heat. This report specifically addresses three of the concepts evaluated: the use of recuperation, the use of turbine reheat, and the non-consumptive use of EGS make-up water to supplement heat rejection

Daniel S. Wendt; Greg L. Mines

2010-09-01T23:59:59.000Z

374

Building bus rapid transit into the existing public transit system : competition and integration of BRT and the Urban Rail Transit in cities in China  

E-Print Network (OSTI)

BRT is a new type of bus transit with high speed and capacity. With its advantages and benefits, BRT is getting popular in the world, including China. Since BRT and urban rail transit (URT) are both rapid public transports, ...

Zhan, Yun, M.C.P. Massachusetts Institute of Technology

2011-01-01T23:59:59.000Z

375

Development of an ultra-safe, ultra-low emissions natural gas-fueled bus. Phase 1: Systems design -- Final report  

DOE Green Energy (OSTI)

The National Renewable Energy Laboratory (NREL) contracted with Southwest Research Institute (SwRI) to develop an ultra-safe, ultra-low emissions natural gas-fueled school bus. To develop the bus, SwRI teamed with Blue Bird, Incorporated, a school bus manufacturer, Deere Power Systems Group, an engine manufacturer, and CNG Cylinder Company, a supplier of compressed natural gas storage and handling systems. The primary focus of work for Phase 1 was the design of the component systems, i.e. vehicle, engine, and fuel storage systems. The bus chassis prototype is expected to be completed by the middle of July, 1995. A complete prototype vehicle body and chassis should be delivered to SwRI by the beginning of December, 1995. This prototype vehicle will include the new compressed natural gas cylinders and associated fuel storage system hardware which has been designed by CNG Cylinder Company.

Kubesh, J. [Southwest Research Inst., San Antonio, TX (United States)

1995-05-01T23:59:59.000Z

376

INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY  

Science Conference Proceedings (OSTI)

The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior to deployment and a second ITR to evaluate Phase I performance in September 2010. In this report, these ITR efforts are referenced as the '2007 ITR' and the 'current ITR', respectively. The 2007 ITR document (Looney et al., 2007) provided a detailed technical evaluation that remains relevant and this report builds on that analysis. The primary objective of the current ITR is to provide an expedited assessment of the available Phase I data to assist the PGDP team as they develop the lessons learned from Phase I and prepare plans for Phase II.

Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

2010-10-29T23:59:59.000Z

377

Audit of Bus Service Subsidies at the Idaho National Engineering Laboratory, WR-B-97-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF BUS SERVICE SUBSIDIES AT THE IDAHO NATIONAL ENGINEERING LABORATORY The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost-effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

378

The Energy DataBus: NREL's Open-Source Application for Large-Scale Energy Data Collection and Analysis  

DOE Data Explorer (OSTI)

NREL’s Energy DataBus is used for tracking and analyzing energy use on its own campus. The system is applicable to other facilities—including anything from a single building to a large military base or college campus—or for other energy data management needs. Managing and minimizing energy consumption on a large campus is usually a difficult task for facility managers: There may be hundreds of energy meters spread across a campus, and the meter data are often recorded by hand. Even when data are captured electronically, there may be measurement issues or time periods that may not coincide. Making sense of this limited and often confusing data can be a challenge that makes the assessment of building performance a struggle for many facility managers. The Energy DataBus software was developed by NREL to address these issues on its own campus, but with an eye toward offering its software solutions to other facilities. Key features include the software's ability to store large amounts of data collected at high frequencies—NREL collects some of its energy data every second—and rich functionality to integrate this wide variety of data into a single database [copied from http://en.openei.org/wiki/NREL_Energy_DataBus].

379

Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase - Final Scientific/Technical Report  

DOE Green Energy (OSTI)

The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperaturecompensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations, and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and showcase events include San Antonio and Austin, Texas. In summary, the project objectives wer

Hitchcock, David

2012-06-29T23:59:59.000Z

380

Manifold, bus support and coupling arrangement for solid oxide fuel cells  

DOE Patents (OSTI)

Individual, tubular solid oxide fuel cells (SOFCs) are assembled into bundles called a module within a housing, with a plurality of modules arranged end-to-end in a linear, stacked configuration called a string. A common set of piping comprised of a suitable high temperture resistant material (1) provides fuel and air to each module housing, (2) serves as electrically conducting buses, and (3) provides structural support for a string of SOFC modules. The piping thus forms a manfold for directing fuel and air to each module in a string and makes electrical contact with the module's anode and cathode to conduct the DC power generated by the SOFC. The piping also provides structureal support for each individual module and maintains each string of modules as a structurally integral unit for ensuring high strength in a large 3-dimensional array of SOFC modules. Ceramic collars are used to connect fuel and air inlet piping to each of the electrodes in an SOFC module and provide (1) electrical insulation for the current carrying bus bars and gas manifolds, (2) damping for the fuel and air inlet piping, and (3) proper spacing between the fuel and air inlet piping to prevent contact between these tubes and possible damage to the SOFC.

Parry, Gareth W. (East Windsor, CT)

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report  

SciTech Connect

This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

Pickett, W.W.

1997-12-30T23:59:59.000Z

382

Northeast Site Non-Aqueous Phase Liquids Interim Measures Progress Report-January through March 2003  

Office of Legacy Management (LM)

4-TAC 4-TAC GJO-PIN 13.5.1-1 Pinellas Environmental Restoration Project January through March 2003 Northeast Site Non-Aqueous Phase Liquids Interim Measures Progress Report April 2003 Grand Junction Office U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy DE-AC13-02GJ79491 Approved for public release; distribution is unlimited. N0060900 GJO-2003-434-TAC GJO-PIN 13.5.1-1 Pinellas Environmental Restoration Project Northeast Site Non-Aqueous Phase Liquids Interim Measures Progress Report January through March 2003 April 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-02GJ79491 Task Order Number ST03-107

383

In Situ Bioremediation Interim Remedial Action Report, Test Area North, Operable Unit 1-07B  

E-Print Network (OSTI)

This Interim Remedial Action Report is for the in situ bioremediation remedial component of Operable Unit 1-07B at Test Area North at the Idaho National Laboratory. Under U.S. Environmental Protection Agency guidance, an interim report for a long-term groundwater remedial action provides a chronology of events and a description of the remedial action facilities, systems, components, and operating documents that lead to a declaration that the system is operational and functional. It is the conclusion of this report that the in situ bioremediation remedial component includes the infrastructure and programs necessary to achieve the objectives of the in situ bioremediation remedial component for contaminated groundwater in the vicinity of the TSF-05 well; therefore, it can be deemed operational and functional. iii ivCONTENTS ABSTRACT.................................................................................................................................................iii

Unit -b; Prepared For The

2009-01-01T23:59:59.000Z

384

Field Testing of Location Tracking Technologies for Radiation Management: Interim Report  

Science Conference Proceedings (OSTI)

The nuclear power industry is challenged with monitoring an ever-increasing load of work activities and workers, while cost effective measures have greatly reduced the number of staff able to perform job coverage. The adoption of location tracking technologies may assist plant staff in maintaining safe operation of nuclear power plants. Performing field tests of the available equipment will help the industry understand the set up requirements and limitations of coverage. This interim report provides info...

2011-12-20T23:59:59.000Z

385

2011 Interim Review of the Pressurized Water Reactor Secondary Water Chemistry Guidelines -- Revision 7  

Science Conference Proceedings (OSTI)

EPRI periodically updates its PWR water chemistry guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). An industry review committee meeting in September 2011 determined that a revision of the 2009 version of EPRI's Pressurized Water Reactor Secondary Water Chemistry Guidelines is not warranted at this time, nor is interim guidance required.

2011-12-15T23:59:59.000Z

386

Effective Personnel Exposure Control in Shortened Refueling Outages: Interim Report: Review of Remote Monitoring Systems  

Science Conference Proceedings (OSTI)

Many utilities are currently investigating technologies such as remote monitoring systems (RMS) to optimize their radiation protection capabilities. This interim report provides a brief description of the hardware and features of remote monitoring systems at four nuclear power plants, and serves as the basis for EPRI work dedicated to the advancement of RMS technology for radiation protection applications. This information can significantly benefit those utilities presently planning major RMS installations.

2002-11-18T23:59:59.000Z

387

Interim action record of decision remedial alternative selection: TNX area groundwater operable unit  

Science Conference Proceedings (OSTI)

This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit.

Palmer, E.R.

1994-10-01T23:59:59.000Z

388

Design requirements document for project W-465, immobilized low activity waste interim storage  

SciTech Connect

The scope of this design requirements document is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste produced by the privatized Tank Waste Remediation System treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized low-activity waste interim storage facility project and provides traceability from the program level requirements to the project design activity.

Burbank, D.A.

1997-01-27T23:59:59.000Z

389

Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility  

SciTech Connect

This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

JANIN, L.F.

2000-08-30T23:59:59.000Z

390

Extended-burnup LWR (light-water reactor) fuel: The amount, characteristics, and potential effects on interim storage  

Science Conference Proceedings (OSTI)

The results of a study on extended-burnup, light-water reactor (LWR) spent fuel are described in this report. The study was performed by Pacific Northwest Laboratory for the US Department of Energy (DOE). The purpose of the study was to collect and evaluate information on the status of in-reactor performance and integrity of extended-burnup LWR fuel and initiate the investigation of the effects of extending fuel burnup on the subsequent handling, interim storage, and other operations (e.g., rod consolidation and shipping) associated with the back end of the fuel cycle. The results of this study will aid DOE and the nuclear industry in assessing the effects on waste management of extending the useful in-reactor life of nuclear fuel. The experience base with extended-burnup fuel is now substantial and projections for future use of extended-burnup fuel in domestic LWRs are positive. The basic performance and integrity of the fuel in the reactor has not been compromised by extending the burnup, and the potential limitations for further extending the burnup are not severe. 104 refs., 15 tabs.

Bailey, W.J.

1989-03-01T23:59:59.000Z

391

Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Date Report No. 3: Diesel Fuel Sulfur Effects on Particulate Matter Emissions  

DOE Green Energy (OSTI)

The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim report covers the effects of diesel fuel sulfur level on particulate matter emissions for four technologies.

DOE; ORNL; NREL; EMA; MECA

1999-11-15T23:59:59.000Z

392

Evaluation of near-term electric vehicle battery systems through in-vehicle testing: Interim report  

SciTech Connect

EVTF personnel tested 10 batteries, including lead-acid (flat plate and tubular design), Gel Cell III, advanced lead-acid, nickel iron, nickel zinc, nickel cadmium, and zinc chloride systems. The assessment encompassed the following tasks: initial acceptance testing of battery components and systems, daily in-vehicle operation of the batteries, monthly in-vehicle driving range tests, and periodic static discharge tests under computer control. Performance data were based on specific energy versus accumulated vehicle mileage and vehicle driving range over a fixed operating cycle at 35-mph constant speed and the SAE J227a C cycle. A battery's life cycle was terminated when its measured capacity dropped below 60% of the rating, at a 2-h rate, after 25% of the battery modules had been replaced. The EVs used for the tests were 10 Volkswagen vans and 2 General Motors Griffin vans.

Blickwedel, T.W.

1986-12-01T23:59:59.000Z

393

Interim evaluation of nickel plate on aluminum-jacketed fuel elements  

SciTech Connect

Nickel plating on the coolant contacting surfaces of aluminum-jacketed fuel elements is highly attractive for increasing resistance. Potential benefits include a highly corrosion-resistant coating for severe localized conditions, reduction of mechanical damage to fuel element jackets, improved fuel element alignment (by reducing friction between fuel element and process tube ribs) and probably lower overfall surface temperatures to reduction in corrosion product film with improved corrosion resistance, neutron economy might also be realized. For example, substitution of a 0.5 mil thick nickel plate for 15-mils thickness of aluminum jacket would result in no reactivity loss and permit a concomitant increase in uranium volume, or in coolant flow annulus. Attendant problems include providing an adherent continuous plate of uniform thickness and possibly contamination of reactor effluent by radio-nickel-cobalt, and phosphorous and it was found that gross sloughing of the nickel plate had occurred. Development and testing work was carried out to determine the cause and a solution to the Greece problem. Studies were limited to the behavior of chemically-deposited nickel because of the unique capability of the process to deposit a coating of uniform thickness in the 0.1 - 0.2 mils thick range, regardless of the geometry of the plated piece. Based on ex- reactor tests, a readily applicable method for significantly improving plate adherence has been developed, as summarized in this report.

Jacky, G.F.

1960-02-08T23:59:59.000Z

394

SODIUM-HEATED STEAM GENERATOR DEVELOPMENT. Interim Status Report  

SciTech Connect

Design and development of a once -through sodiumheated steam generator are discussed. Research proposals are discussed for evaluating: carbon transfer and mass transfer effects in the steam generator, effect on heat transfer and two- phase flow of coiling tubes, corrosion of Croloy 21/4 in products of sodium-water reactions, procedure for welding tube to back side of the tube sheet, radiographic inspection of back side tube welds, and chemical simulation of sodium environment for leak testing. (N.W.R.)

1964-01-22T23:59:59.000Z

395

Advanced membrane devices. Interim report for October 1996--September 1997  

SciTech Connect

Under this Cooperative Agreement, Air Products and Chemicals, Inc. has continued to investigate and develop improved membrane technology for removal of carbon dioxide from natural gas. The task schedule for this reporting period included a detailed assessment of the market opportunity (Chapter 2), continued development and evaluation of membranes and membrane polymers (Chapter 3) and a detailed economic analysis comparing the potential of Air Products membranes to that of established acid gas removal processes (Chapter 4).

Laciak, D.V.; Langsam, M.; Lewnard, J.J.; Reichart, G.C.

1997-12-31T23:59:59.000Z

396

Interim Guidance - Amine Treatments in Fossil Power Plants  

Science Conference Proceedings (OSTI)

The use of neutralizing amines has been the subject of an evaluation focused on the improvement of the pH conditions in the low-pressure (LP) evaporators and economizers of heat recovery steam generators (HRSGs), the phase transition zone (PTZ) of the LP steam turbine, the condensing steam in air-cooled condensers (ACCs), and the pH conditions at two-phase flow-accelerated corrosion (FAC) locations such as in feedwater heater drains. This report examines actual field use of amine treatments and the therm...

2010-12-23T23:59:59.000Z

397

Clean air program: Design guidelines for bus transit systems using liquefied petroleum gas (LPG) as an alternative fuel. Final report, July 1995-April 1996  

Science Conference Proceedings (OSTI)

The Federal Transit Administration (FTA) has initiated the development of `Design Guidelines for Bus Transit Systems Using Alternative Fuels.` This report provides design guidelines for the safe uses of Liquefied Petroleum Gas (LPG). It forms a part of the series of individual monographs being published by the FTA on (the guidelines for the safe use of) Compressed Natural Gas (CNG), Liquefied Natural Gas (LNG), Liquefied Petroleum Gas (LPG) and alcohol fuels (Methanol and Ethanol). Each report in this series describes for the subject fuel the important fuel properties, guidelines for the design and operation of bus fueling, storage and maintenance facilities, issues on personnel training and emergency preparedness.

Raj, P.K.; Hathaway, W.T.; Kangas, R.

1996-09-01T23:59:59.000Z

398

Transcript: NU-BAYU: Google Bus Visits NU, October 6, 2008 Sherry: Hi, my name is Sherry Minton. I work with NUIT Communications, and I'm here with  

E-Print Network (OSTI)

Transcript: NU-BAYU: Google Bus Visits NU, October 6, 2008 Sherry: Hi, my name is Sherry Minton. I work with NUIT Communications, and I'm here with Miriam Schneider of Google, and the Google Bus has arrived on campus, and Miriam, tell us what you do at Google and why you're here. Miriam: Sure. So I am

Shull, Kenneth R.

399

T-TY Tank Farm Interim Surface Barrier Demonstration—Vadose Zone Monitoring Plan  

SciTech Connect

The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy’s Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

2010-09-27T23:59:59.000Z

400

Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado  

SciTech Connect

This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

NONE

1997-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Interim Storage of Greater than Class C Low Level Waste, Rev. 1  

Science Conference Proceedings (OSTI)

This report serves as a guideline for the safe, interim on-site storage of low-level radioactive waste (LLW) that exceeds the activity limitations for near-surface disposal set forth in 10 CFR 61.55. The nuclear industry refers to this waste as "greater than Class C (GTTC) waste" as it exceeds the Class C limits in the referenced regulation. At the present time, there is no licensed disposal facility for GTCC waste in the United States . This situation forces commercial nuclear reactors to store it on si...

2003-07-23T23:59:59.000Z

402

Department of Energy Plutonium ES&H Vulnerability Assessment Savannah River Site interim compensatory measures  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) has recently completed a self-assessment of potential vulnerabilities associated with plutonium and other transuranic materials stored at the site. An independent Working Group Assessment Team (WGAT) appointed by DOE/ES&H also performed an independent assessment, and reviewed and validated the site self-assessment. The purpose of this report is to provide a status of interim compensatory measures at SRS to address hazards in advance of any corrective actions. ES&H has requested this status for all vulnerabilities ranked medium or higher with respect to potential consequences to workers, environment, and the public.

Bickford, W.E.

1994-09-15T23:59:59.000Z

403

Hydrogen combustion in an MCO during interim storage (fauske and associates report 99-14)  

DOE Green Energy (OSTI)

Flammable conditions are not expected to develop in an MCO during interim storage. This report considers potential phenomena which, although not expected t o occur, could lead t o flammable conditions. For example, reactions of hydrogen w i t h fuel over decades a r e postulated t o lead t o flammable atmospheric mixtures. For the extreme cases considered in this report, the highest attainable post-combustion pressure is about 13 atmospheres absolute, almost a factor of two and a half below the MCO design pressure of 31 atmospheres.

PLYS, M.G.

1999-05-12T23:59:59.000Z

404

Recommended Changes to Guidelines for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility - For NRC Review  

Science Conference Proceedings (OSTI)

The majority of commercial U.S. nuclear stations have constructed on-site low-level waste (LLW) storage facilities, and most of these same utilities are experiencing or have experienced at least one period of interim on-site storage. EPRI has issued two revisions of Guidelines for Operating an Interim On-Site Low Level Radioactive Waste Storage Facility. Revision 1 of these Guidelines focused on operational considerations and incorporated many of the lessons learned while operating various types of LLW s...

2011-12-19T23:59:59.000Z

405

Additional EIPC Study Analysis: Interim Report on High Priority Topics  

SciTech Connect

Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.

Hadley, Stanton W [ORNL] [ORNL

2013-11-01T23:59:59.000Z

406

Evaluating the energy consumption and the silicon area of on-chip interconnect architectures  

Science Conference Proceedings (OSTI)

Sophisticated on-chip interconnects using packet and circuit switching techniques were recently proposed as a solution to non-scalable shared-bus schemes currently used in Systems-on-Chip (SoCs) implementation. Different interconnect architectures have ... Keywords: Energy consumption and area requirements, Load and traffic models, On-chip interconnects, Simulation and evaluation, System-on-Chip

Mohamed Bakhouya

2009-07-01T23:59:59.000Z

407

Interim report of the Advisory Committee on human radiation experiments  

SciTech Connect

The Advisory Committee on Human Radiation Experiments was created by President Clinton to advise the Human Radiation Interagency Working Group on the ethical and scientific criteria applicable to human radiation experiments carried out or sponsored by the U.S. Government. The Committee seeks to answer several fundamental question: What ethics criteria should be used to evaluate human radiation experiments? What was the Federal Government`s role in human radiation experiments? What are the criteria for determining appropriate Federal responses where wrongs or harms have occurred? What lessons learned from studying past and present research standards and practices should be applied to the future? The Committee has been gathering vast amounts of information and working to render it orderly and accessible. In the next six months, the Committee will continue with the tasks of data gathering and organizing. The focus of the work, however, will be developing criteria for judging historical and contemporary experiments, policies, and procedures, as well as criteria for remedies that may be appropriate where harms or wrongs have ocurred. Based on findings, the Committee will make specific recommendations regarding policies for the future.

Not Available

1994-10-21T23:59:59.000Z

408

Lower Flathead System Fisheries Study, 1986 Interim Report.  

DOE Green Energy (OSTI)

We believe our results have clearly shown Kerr hydroelectric operations and operational constraints have negatively affected Flathead River trout and northern pike populations and the aquatic habitat which support them. Even so, it is possible to mitigate many of these impacts and develop a very important fishery. Trout abundance in the lower Flathead averaged only 19 fish per kilometer, the lowest abundance of trout for a river of this size in Montana. Little main channel spawning by trout was observed and most spawning probably occurs in tributaries. Lower river tributaries support resident populations of brook, rainbow, brown, and cutthroat trout; and a small resident population of bull trout is present in the South Fork of the Jocko River. Using weirs, spawning runs of rainbow and brown trout from the main river were monitored entering the Jocko River and the Post/Mission Creek system. Utilization of Crow Creek by main river trout stocks of trout was limited to the 6 km segment below Crow Dam. Evaluations of tributary spawning gravels showed high levels of silt which would suggest poor survival of trout eggs. Excessive harvest in the tributaries was indicated by analysis of age class structure and abundance of trout greater than 200 mm.

Bradshaw, William H.; DosSantos, Joseph M.; Darling, James M.

1986-08-01T23:59:59.000Z

409

Hanford Tank Farm interim storage phase probabilistic risk assessment outline  

Science Conference Proceedings (OSTI)

This report is the second in a series examining the risks for the high level waste (HLW) storage facilities at the Hanford Site. The first phase of the HTF PSA effort addressed risks from Tank 101-SY, only. Tank 101-SY was selected as the initial focus of the PSA because of its propensity to periodically release (burp) a mixture of flammable and toxic gases. This report expands the evaluation of Tank 101-SY to all 177 storage tanks. The 177 tanks are arranged into 18 farms and contain the HLW accumulated over 50 years of weapons material production work. A centerpiece of the remediation activity is the effort toward developing a permanent method for disposing of the HLW tank`s highly radioactive contents. One approach to risk based prioritization is to perform a PSA for the whole HLW tank farm complex to identify the highest risk tanks so that remediation planners and managers will have a more rational basis for allocating limited funds to the more critical areas. Section 3 presents the qualitative identification of generic initiators that could threaten to produce releases from one or more tanks. In section 4 a detailed accident sequence model is developed for each initiating event group. Section 5 defines the release categories to which the scenarios are assigned in the accident sequence model and presents analyses of the airborne and liquid source terms resulting from different release scenarios. The conditional consequences measured by worker or public exposure to radionuclides or hazardous chemicals and economic costs of cleanup and repair are analyzed in section 6. The results from all the previous sections are integrated to produce unconditional risk curves in frequency of exceedance format.

Not Available

1994-05-19T23:59:59.000Z

410

Energy policy act transportation study: Interim report on natural gas flows and rates  

Science Conference Proceedings (OSTI)

This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of natural gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.

NONE

1995-11-17T23:59:59.000Z

411

Identifying Potential Areas for Siting Interim Nuclear Waste Facilities Using Map Algebra and Optimization Approaches  

Science Conference Proceedings (OSTI)

The renewed interest in siting new nuclear power plants in the United States has brought to the center stage, the need to site interim facilities for long-term management of spent nuclear fuel (SNF). In this paper, a two-stage approach for identifying potential areas for siting interim SNF facilities is presented. In the first stage, the land area is discretized into grids of uniform size (e.g., 100m x 100m grids). For the continental United States, this process resulted in a data matrix of about 700 million cells. Each cell of the matrix is then characterized as a binary decision variable to indicate whether an exclusion criterion is satisfied or not. A binary data matrix is created for each of the 25 siting criteria considered in this study. Using map algebra approach, cells that satisfy all criteria are clustered and regarded as potential siting areas. In the second stage, an optimization problem is formulated as a p-median problem on a rail network such that the sum of the shortest distance between nuclear power plants with SNF and the potential storage sites from the first stage is minimized. The implications of obtained results for energy policies are presented and discussed.

Omitaomu, Olufemi A [ORNL; Liu, Cheng [ORNL; Cetiner, Mustafa Sacit [ORNL; Belles, Randy [ORNL; Mays, Gary T [ORNL; Tuttle, Mark A [ORNL

2013-01-01T23:59:59.000Z

412

Warm conveyor belts in the ERA-Interim data set (1979-2010). Part I: Climatology and potential vorticity evolution.  

Science Conference Proceedings (OSTI)

A global climatology of warm conveyor belts (WCBs) is presented for the years 1979-2010, based upon trajectories calculated with ERA-Interim reanalyses. WCB trajectories are identified as strongly ascending air parcels (600 hPa in 2 days) near ...

Erica Madonna; Heini Wernli; Hanna Joos; Olivia Martius

413

Reduction in Defect Content in ODS Alloys II Interim Report on Contract 1DX-SY382V  

E-Print Network (OSTI)

quality and potential creep performance (particularly) in the consolidated, release condition. The interim defined in the micrograph. However, the transformation is obvious if compared with a fine-grained region. The system pressure was also monitored with an ion gauge. The mass spectrometer and thermocouples can

414

3013/9975 Surveillance Program Interim Summary Report  

SciTech Connect

The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program [Reference 1] outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) [Reference 2] for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container [Reference 3]. The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure & Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure & Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013 Standard moisture limit which was opened at LANL. The container pieces and an oxide sample were sent to SRNL for examination in FY11. No significant pressurization has been observed for the Pressure & Corrosion bin containers. Relatively minor corrosion has been observed on some convenience containers and the inside of two inner containers. While the limited extent of corrosion does not jeopardize the integrity of the outer 3013 containers, it does highlight the importance of continuing to perform DE and the Shelf Life program to assure that the corrosion rate is not accelerating or changing to a different corrosion mechanism (e.g., stress corrosion cracking). Statistical sampling is currently scheduled to be completed in FY17, but there is a proposed reduction of the number of DE's per year for FY11 and beyond which may delay the completion date. Since 3013 containers are stored inside 9975 containers, surveillances of 9975 containers are performed in conjunction with 3013 container surveillances. Results of 9975 container nondestructive examinations (NDEs) and DEs indicate that the containers will provide adequate protection of the 3013 containers in K-Area storage for at least 15 years [Reference 4].

Dunn, K.; Hackney, B.; McClard, J.

2011-06-22T23:59:59.000Z

415

Risk Assessment Guidance for Superfund: Volume I-Human Health Evaluation Manual (Part C, Risk Evaluation of Remedial Alternatives)  

NLE Websites -- All DOE Office Websites (Extended Search)

C, Risk C, Risk Evaluation of Remedial Alternatives) Interim United States Office of Research and EPA/540/R-92/003 Environmental Protection Development December 1991 Agency Washington, DC 20460 EPA/540/R-92/004 Publication 9285.7-01 C December 1991 Risk Assessment Guidance for Superfund: Volume I - Human Health Evaluation Manual (Part C, Risk Evaluation of Remedial Alternatives) Interim Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 Printed on Recycled Paper NOTICE The policies set out in [his document are intended solely as guidance; they are not final U.S. Environmental Protection Agency (EPA) actions. These policies are not intended, nor can they be relied upon, to create any rights enforceable by any party in litigation with the United States. EPA officials may

416

Development of an ultra-safe, ultra-low emissions natural gas fueled school bus: Final report  

DOE Green Energy (OSTI)

This report documents work conducted under Southwest Research Institute (SwRI) Project 03-6871, ``Development of an Ultra-Safe and Low-Emission Dedicated Alternative Fuel School Bus.`` The project was sponsored by the National Renewable Energy Laboratory (NREL) under Subcontract No. ZCF-5-13519-01. This report documents Phase 3 -- Integration and Phase 4 -- Demonstration and serves as the final report for this project. Phase 1 -- Systems Design and Phase 2 -- Prototype Hardware Development were documented in NREL publications TP-425-7609 and TP-425-2 1081, respectively. Several significant areas of work are summarized in this report. Integration of the engine technologies developed under Phase 2 into a production Deere 8.1-L, spark-ignition compressed natural gas engine is detailed, including information on the engine and control system modifications that were made. Federal Test Procedure (FTP) emissions results verifying the ultra-low emissions output of this engine are also included. The informal project goal of producing oxides of nitrogen (NO{sub x}) emissions less than or equal to 1.0 g/bhp-hr over the FTP heavy-duty engine cycle was attained. In addition, a test run that resulted in less than one half of the Ultra-Low Emissions Vehicle limit for NO{sub x} plus non-methane hydrocarbons was obtained. These results were for engine-out (no catalyst) emissions. Results using a catalyst produced very low formaldehyde emissions and virtually zero carbon monoxide and particulate matter emissions. Following these excellent results, a duplicate engine was assembled and integrated into the prototype ultra-safe school bus, the Envirobus 2000. Many of the new and modified subsystems developed during this project for the engine are considered strong candidates for inclusion into the production Deere 8.1-L gas engine in the near future.

Kubesh, J.T. [Southwest Research Inst., San Antonio, TX (United States)

1998-03-01T23:59:59.000Z

417

Evaluation of storage/transportation options to support criteria development for the Phase I MRS (Monitored Retrievable Storage)  

SciTech Connect

The Department of Energy's (DOE) Office of Civilian Waste Management (OCRWM) plans to develop an interim storage facility to enable acceptance of spent fuel in 1998. It is estimated that this interim storage facility would be needed for about two years. A Monitored Retrievable Storage (MRS) facility is anticipated in 2000 and a repository in 2010. Acceptance and transport of spent fuel by DOE/OCRWM in 1998 will require an operating transportation system. Because this interim storage facility is not yet defined, development of an optimally compatible transportation system is not a certainty. In order to assure a transport capability for 1998 acceptance of spent fuel, it was decided that the OCRWM transportation program had to identify likely options for an interim storage facility, including identification of the components needed for compatibility between likely interim storage facility options and transportation. Primary attention was given to existing hardware, although conceptual designs were also considered. A systems-based probabilistic decision model was suggested by Sandia National Laboratories and accepted by DOE/OCRWM's transportation program. Performance of the evaluation task involved several elements of the transportation program. This paper describes the decision model developed to accomplish this task, along with some of the results and conclusions. 1 ref., 4 figs.

Sorenson, K.B.; Brown, N.N.; Bennett, P.C. (Sandia National Labs., Albuquerque, NM (USA)); Lake, W. (USDOE Office of Civilian Radioactive Waste Management, Washington, DC (USA))

1991-01-01T23:59:59.000Z

418

Evaluation of storage/transportation options to support criteria development for the Phase I MRS (Monitored Retrievable Storage)  

SciTech Connect

The Department of Energy's (DOE) Office of Civilian Waste Management (OCRWM) plans to develop an interim storage facility to enable acceptance of spent fuel in 1998. It is estimated that this interim storage facility would be needed for about two years. A Monitored Retrievable Storage (MRS) facility is anticipated in 2000 and a repository in 2010. Acceptance and transport of spent fuel by DOE/OCRWM in 1998 will require an operating transportation system. Because this interim storage facility is not yet defined, development of an optimally compatible transportation system is not a certainty. In order to assure a transport capability for 1998 acceptance of spent fuel, it was decided that the OCRWM transportation program had to identify likely options for an interim storage facility, including identification of the components needed for compatibility between likely interim storage facility options and transportation. Primary attention was given to existing hardware, although conceptual designs were also considered. A systems-based probabilistic decision model was suggested by Sandia National Laboratories and accepted by DOE/OCRWM's transportation program. Performance of the evaluation task involved several elements of the transportation program. This paper describes the decision model developed to accomplish this task, along with some of the results and conclusions. 1 ref., 4 figs.

Sorenson, K.B.; Brown, N.N.; Bennett, P.C. (Sandia National Labs., Albuquerque, NM (USA)); Lake, W. (USDOE Office of Civilian Radioactive Waste Management, Washington, DC (USA))

1991-01-01T23:59:59.000Z

419

Design requirements document for Project W-465, immobilized low-activity waste interim storage  

SciTech Connect

The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project.

Burbank, D.A.

1998-05-19T23:59:59.000Z

420

Energy conservation potential of the US Department of Energy interim commercial building standards  

SciTech Connect

This report describes a project conducted to demonstrate the whole-building energy conservation potential achievable from full implementation of the US Department of Energy (DOE) Interim Energy Conservation Performance Standards for New Commercial and Multi-Family High Rise Residential Buildings. DOE`s development and implementation of energy performance standards for commercial buildings were established by the Energy Conservation Standards for New Buildings Act of 1976, as amended, Public Law (PL) 94-385, 42 USC 6831 et seq., hereinafter referred to as the Act. In accordance with the Act, DOE was to establish performance standards for both federal and private sector buildings ``to achieve the maximum practicable improvements in energy efficiency and use of non-depletable resources for all new buildings``.

Hadley, D.L.; Halverson, M.A.

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

PROJECT W-551 SUMMARY INFORMATION FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION  

SciTech Connect

This report provides summary data for use by the decision board to assess and select the final technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-fonnaldebyde resin. This document provides a summary of comparative data against prior weighted criteria to support technology selection. Supporting details and background for this summary are documented in the separate report, RPP-RPT-37741.

TEDESCHI AR

2008-08-11T23:59:59.000Z

422

Electric car design. Interim summary report, Phase I: deliverable item 9  

DOE Green Energy (OSTI)

The work included in this Interim Summary Report is part of the Electric Car Program, the goal of which is to develop by 1979 a totally new electric car with substantially improved performance over those electric cars available in 1976. The rationale used in designing a four-passenger electric car for use in an urban environment is presented. The approach taken was to design an electric car utilizing current technology. On the basis of tradeoff analyses, upgrading improvements were identified which would permit the electric car to more nearly meet all of the ERDA near-term goals. The electric car design, including the chassis, drive train, major components, and the control are summarized. The Phase I electric car design will meet many of the ERDA near-term goals. Upgrading development programs are identified which, when incorporated in Phase II vehicle development, will result in upgraded performance, which essentially meets ERDA's near-term goals.

Not Available

1977-05-09T23:59:59.000Z

423

Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996  

Science Conference Proceedings (OSTI)

OAK A271 Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996. The Rockwell International Hot Laboratory (RIHL) is one of a number of former nuclear facilities undergoing decontamination and decommissioning (D&D) at the Santa Susana Field Laboratory (SSFL). The RIHL facility is in the later stages of dismantlement, with the final objective of returning the site location to its original natural state. This report documents the decontamination and dismantlement activities performed at the facility over the time period 1988 through 1996. At this time, the support buildings, all equipment associated with the facility, and the entire above-ground structure of the primary facility building (Building 020) have been removed. The basement portion of this building and the outside yard areas (primarily asphalt and soil) are scheduled for D&D activities beginning in 1997.

None

1997-05-06T23:59:59.000Z

424

USING POLYMERIC HYDROGEN GETTERS TO PREVENT COMBUSTIBLE ATMOSPHERES DURING INTERIM SAFE STORAGE OF PLUTONIUM OXIDE  

DOE Green Energy (OSTI)

Nuclear Materials Management (NMM) of WSRC has recently installed the capability to perform both non-destructive and destructive examination of 3013 containers of Pu oxide in accordance with DOE-STD-3013. The containers will be opened and the oxide will be sampled for analysis. The remaining bulk oxide must then be safely stored in a non-3013-compliant configuration. Available processing equipment and controls cannot prevent the oxide from adsorbing moisture during this process. Subsequent radiolysis of moisture during storage may generate combustible quantities of gases while waiting final processing, and satisfying DOE Interim Safe Storage Criteria (ISSC) would require that storage containers be vented at impractical frequencies. With support from an independent National Laboratory, WSRC/NMM has demonstrated that a commercial hydrogen getter material will effectively prevent the accumulation of combustible gas concentrations. A project overview, including storage requirements and strategies, as well as getter technology, current test results, and anticipated future developments will be addressed.

Woodsmall, T

2007-05-24T23:59:59.000Z

425

PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION  

Science Conference Proceedings (OSTI)

This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

TEDESCHI AR

2008-08-11T23:59:59.000Z

426

Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray  

SciTech Connect

This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

2012-05-07T23:59:59.000Z

427

Interim report on updated microarray probes for the LLNL Burkholderia pseudomallei SNP array  

Science Conference Proceedings (OSTI)

The overall goal of this project is to forensically characterize 100 unknown Burkholderia isolates in the US-Australia collaboration. We will identify genome-wide single nucleotide polymorphisms (SNPs) from B. pseudomallei and near neighbor species including B. mallei, B. thailandensis and B. oklahomensis. We will design microarray probes to detect these SNP markers and analyze 100 Burkholderia genomic DNAs extracted from environmental, clinical and near neighbor isolates from Australian collaborators on the Burkholderia SNP microarray. We will analyze the microarray genotyping results to characterize the genetic diversity of these new isolates and triage the samples for whole genome sequencing. In this interim report, we described the SNP analysis and the microarray probe design for the Burkholderia SNP microarray.

Gardner, S; Jaing, C

2012-03-27T23:59:59.000Z

428

DOE/EIA-0272/S The National Interim Energy Consumption Survey:  

U.S. Energy Information Administration (EIA) Indexed Site

272/S 272/S The National Interim Energy Consumption Survey: Exploring the Variability in Energy Consumption - A Supplement October 1981 U.S. Department of Energy Energy Information Administration Office of Energy Markets and End Use This publication is available from the Superintendent of Documents, U.S. Government Printing Office. Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402 Order Desk: (202) 783-3238 Stock Number: 061-003-00217-0 Price: $3.25 For questions on energy statistics or information on availability of other EIA publications, contact. National Energy Information Center, El-20 Forrestal Building U.S. Department of Energy Washington, D.C. 20585 (202) 252-8800 For those living and working in the Mountain and Pacific time zones, you may call:

429

On the Annual Cycle, Variability, and Correlations of Oceanic Low-Topped Clouds with Large-Scale Circulation Using Aqua MODIS and ERA-Interim  

Science Conference Proceedings (OSTI)

Eight years of Aqua Moderate Resolution Imaging Spectroradiometer (MODIS) level-3 cloud data in conjunction with collocated Interim ECMWF Re-Analysis are used to investigate relationships between isolated low-topped cloud fraction (LCF) and ...

Terence L. Kubar; Duane E. Waliser; J.-L. Li; Xianan Jiang

2012-09-01T23:59:59.000Z

430

Amended Record of Decision for the Interim Management of Nuclear Materials (DOE/EIS-0220) (1/26/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

88 88 Federal Register / Vol. 66, No. 18 / Friday, January 26, 2001 / Notices 1 A ''pit'' is a nuclear weapon component. 2 A physical blend of uranium oxide and plutonium oxide. DEPARTMENT OF ENERGY Interim Management of Nuclear Materials AGENCY: Department of Energy ACTION: Amended record of decision. SUMMARY: On December 12, 1995, the U.S. Department of Energy (DOE) issued a Record of Decision (ROD) and Notice of Preferred Alternatives, 60 FR 65300 (December 19, 1995), for the final environmental impact statement, Interim Management of Nuclear Materials (IMNM EIS) (DOE/EIS-0220, October 20, 1995), at the Savannah River Site (SRS), Aiken, South Carolina. As part of its decision, DOE decided to construct a new facility, the Actinide Packaging and Storage Facility (APSF), to prepare, package, and store

431

Joint DOE/EPA Interim Policy Statement on Leasing Under the "Hall Amendment"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Protection Agency Environmental Protection Agency June 23, 1998 Washington, D.C. JUN 30 1998 MEMORANDUM SUBJECT: Joint DOE/EPA Interim Policy Statement on Leasing Under the "Hall Amendment" FROM: Timothy Fields, Jr. Assistant Administrator, Office of Solid Waste and Energy Response (Acting) United States Environmental Protection Agency James M. Owendoff Assistant Secretary Environmental Management (Acting) United States Department of Energy Robert W. DeGrasse, Jr. Director, Office of Worker and Community United States Department of Energy G. Thomas Todd Director, Office of Field Management United States Department _______________________________________________________________ Attached is a joint statement between the United States Environmental Protection Agency. (U.S., EPA) and the United States Department of Energy (DOE) providing interim policy on processing

432

NOTICE OF AVAILABILITY - INTERIM RECORD OF DECISION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 April 30, 2013 NOTICE OF AVAILABILITY - INTERIM RECORD OF DECISION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 The Interim Record of Decision (IROD) Remedial Alternative Selection for the F-Area Tank Farm (FTF), Waste Tanks 17 and 20, is being issued by the U.S. Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concur- rence by the U.S. Environmental Protection Agency - Region 4 (EPA), and South Carolina Department of Health and Environ- mental Control (SCDHEC). The IROD was completed to facilitate the terms of the Federal Facility Agreement (FFA) for SRS governing the investigation and cleanup of waste units. The FFA integrates the requirements of Resource Conservation and Re- covery Act and the Comprehensive Environmental Response, Compensation, and Liability Act.

433

A Case Study on the Effects of Distribution Line Capacitors on Substation Bus Voltage Regulated with a Load Tap Changing (LTC) Power Transformer: Southern Company Smart Grid Demonstration  

Science Conference Proceedings (OSTI)

This case study describes research to address the adverse effects of distribution capacitors on substation bus voltage with a load-tap-changing (LTC) power transformer. By adding fixed and switched capacitors to the distribution system, Southern Company is able to maintain an efficient distribution grid by providing the reactive power near the end-use devices consuming this power. However, pressure to improve the efficiency of the distribution system has resulted in Southern Company adding a large ...

2013-12-12T23:59:59.000Z

434

Interim Report: 100-NR-2 Apatite Treatability Test: Low Concentration Calcium Citrate-Phosphate Solution Injection for In Situ Strontium-90 Immobilization  

SciTech Connect

Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100-NR-2 hydrogeologic conditions, U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N Area will include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary (most likely phytoremediation). Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing Sr-90 flux to the river at a reasonable cost. In July 2005, aqueous injection, (i.e., the introduction of apatite-forming chemicals into the subsurface) was endorsed as the interim remedy and selected for field testing. Studies are in progress to assess the efficacy of in situ apatite formation by aqueous solution injection to address both the vadose zone and the shallow aquifer along the 300 ft of shoreline where Sr-90 concentrations are highest. This report describes the field testing of the shallow aquifer treatment.

Williams, Mark D.; Fritz, Brad G.; Mendoza, Donaldo P.; Rockhold, Mark L.; Thorne, Paul D.; Xie, YuLong; Bjornstad, Bruce N.; Mackley, Rob D.; Newcomer, Darrell R.; Szecsody, James E.; Vermeul, Vincent R.

2008-07-11T23:59:59.000Z

435

Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development  

SciTech Connect

Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants.

1977-08-01T23:59:59.000Z

436

Clean air program: Design guidelines for bus transit systems using hydrogen as an alternative fuel. Final report, September 1997--May 1998  

SciTech Connect

Alternative fuels such as Compressed Natural Gas (CNG), Liquefied Natural Gas (LNG), Liquified Petroleum Gas (LPG), and alcohol fuels (methanol and ethanol) are already being used in commercial vehicles and transit buses in revenue service. Hydrogen, which has better air quality characteristics as a vehicle fuel, is being used in research demonstration projects in fuel cell powered buses, as well as in internal combustion engines in automobiles and small trucks. At present, there are no facility guidelines to assist transit agencies (and others) contemplating the use of hydrogen as an alternative fuel. This document addresses the various issues involved. Hydrogen fuel properties, potential hazards, fuel requirements for specified levels of bus service, applicable codes and standards, ventilation, and electrical classification are indicated in this document. These guidelines also present various facility and bus design issues that need to be considered by a transit agency to ensure safe operations when using hydrogen as an alternative fuel. Fueling facility, garaging facility, maintenance facility requirements and safety practices are discussed. Critical fuel-related safety issues in the design of the related system on the bus are also identified. A system safety assessment and hazard resolution process is also presented. This approach may be used to select design strategies which are economical, yet ensure a specified level of safety.

Raj, P.K.; Hathaway, W.T.; Kangas, R.A.

1998-10-01T23:59:59.000Z

437

Effect of B20 and Low Aromatic Diesel on Transit Bus NOx Emissions Over Driving Cycles with a Range of Kinetic Intensity  

DOE Green Energy (OSTI)

Oxides of nitrogen (NOx) emissions for transit buses for up to five different fuels and three standard transit duty cycles were compared to establish whether there is a real-world biodiesel NOx increase for transit bus duty cycles and engine calibrations. Six buses representing the majority of the current national transit fleet and including hybrid and selective catalyst reduction systems were tested on a heavy-duty chassis dynamometer with certification diesel, certification B20 blend, low aromatic (California Air Resources Board) diesel, low aromatic B20 blend, and B100 fuels over the Manhattan, Orange County and UDDS test cycles. Engine emissions certification level had the dominant effect on NOx; kinetic intensity was the secondary driving factor. The biodiesel effect on NOx emissions was not statistically significant for most buses and duty cycles for blends with certification diesel, except for a 2008 model year bus. CARB fuel had many more instances of a statistically significant effect of reducing NOx. SCR systems proved effective at reducing NOx to near the detection limit on all duty cycles and fuels, including B100. While offering a fuel economy benefit, a hybrid system significantly increased NOx emissions over a same year bus with a conventional drivetrain and the same engine.

Lammert, M. P.; McCormick, R. L.; Sindler, P.; Williams, A.

2012-10-01T23:59:59.000Z

438

Copper Heat Exchanger for the External Auxiliary Bus-Bars Routing Line in the LHC Insertion Regions  

E-Print Network (OSTI)

The corrector magnets and the main quadrupoles of the LHC dispersion suppressors are powered by a special superconducting line (called auxiliary bus-bars line N), external to the cold mass and housed in a 50 mm diameter stainless steel tube fixed to the cold mass. As the line is periodically connected to the cold mass, the same gaseous and liquid helium cools both the magnets and the line. The final sub-cooling process (from around 4.5 K down to 1.9 K) consists in the phase transformation from liquid to superfluid helium. Heat is extracted from the line through the magnets via their point of junction. In dispersion suppressor zones, approximately 40 m long, the sub-cooling of the line is slightly delayed with respect to the magnets. This might have an impact on the readiness of the accelerator for operation. In order to accelerate the process, a special heat exchanger has been designed. It is located in the middle of the dispersion suppressor portion of the line. Its main function consists in providing a loca...

Garion, C; Seyvet, F; Sitko, M; Skoczen, B; Tock, J P

2006-01-01T23:59:59.000Z

439

Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration: First Results Report  

DOE Green Energy (OSTI)

This report documents the early implementation experience for the Zero Emission Bay Area (ZEBA) Demonstration, the largest fleet of fuel cell buses in the United States. The ZEBA Demonstration group includes five participating transit agencies: AC Transit (lead transit agency), Santa Clara Valley Transportation Authority (VTA), Golden Gate Transit (GGT), San Mateo County Transit District (SamTrans), and San Francisco Municipal Railway (Muni). The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service.

Chandler, K.; Eudy, L.

2011-08-01T23:59:59.000Z

440

Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report  

SciTech Connect

This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.

The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

2011-06-20T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration: Second Results Report  

DOE Green Energy (OSTI)

This report presents results of a demonstration of 12 new fuel cell electric buses (FCEB) operating in Oakland, California. The 12 FCEBs operate as a part of the Zero Emission Bay Area (ZEBA) Demonstration, which also includes two new hydrogen fueling stations. This effort is the largest FCEB demonstration in the United States and involves five participating transit agencies. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The first results report was published in August 2011, describing operation of these new FCEBs from September 2010 through May 2011. New results in this report provide an update through April 2012.

Eudy, L.; Chandler, K.

2012-07-01T23:59:59.000Z

442

T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring FY10 Report  

SciTech Connect

The U.S. Department of Energy’s Office of River Protection has constructed interim surface barriers over a portion of the T and TY tank farms as part of the Interim Surface Barrier Demonstration Project. The interim surface barriers (hereafter referred to as the surface barriers or barriers) are designed to minimize the infiltration of precipitation into the soil zones containing radioactive contaminants and minimize the movement of the contaminants. As part of the demonstration effort, vadose zone moisture is being monitored to assess the effectiveness of the barriers at reducing soil moisture. Solar-powered systems were installed to continuously monitor soil water conditions at four locations in the T (i.e., instrument Nests TA, TB, TC, and TD) and the TY (i.e., instrument Nests TYA and TYB) Farms beneath the barriers and outside the barrier footprint as well as site meteorological conditions. Nests TA and TYA are placed in the area outside the barrier footprint and serve as controls, providing subsurface conditions outside the influence of the surface barriers. Nest TB provides subsurface measurements to assess surface-barrier edge effects. Nests TC, TD, and TYB are used to assess changes in soil-moisture conditions beneath the interim surface barriers. Except for occasional times for TC and TD and planned dates for TYB, during FY10, the battery voltage at the TMS and instrument Nests in both T and TY tank farms remained above 12.0 V, denoting that the battery voltages were sufficient for the stations to remain functional. All the HDUs were functioning normally, but some pressure-head values were greater than the upper measurement limit. The values that exceeded the upper limit may indicate wet soil conditions and/or measurement error, but they do not imply a malfunction of the sensors. Similar to FY07 through FY09, in FY10, the soil under natural conditions in the T Farm (Nest TA) was generally recharged during the winter period (October–March), and they discharged during the summer period (April–September). Soil water conditions above about 1.5-m to 2-m depth from all three types of measurements (i.e., CP, NP, and HDU) showed relatively large variation during the seasonal wetting-drying cycle. For the soil below 2-m depth, the seasonal variation of soil water content was relatively small. The construction of the TISB was completed in April 2008. In the soil below the TISB (Nests TC and TD), the CP-measured water content showed that ? at the soil between 0.6-m and 2.3-m depths was stable, indicating no climatic impacts on soil water conditions beneath the barrier. The NP-measured water content in the soil between about 3.4 m (11 ft) and 12.2 m (40 ft) since the completion of the barrier decreased by 0.007 to 0.014 m3 m-3. The HDU-measured soil-water pressure at 1-m, 2-m, and 5-m depths decreased by 0.7 to 2.4 m, indicating soil water drainage at these depths of the soil. In the soil below the edge of the TISB (Nest TB), the CP-measured water content was relatively stable through the year; the NP-measured water content showed that soil water drainage was occurring in the soil between about 3.4 m (11 ft) and 12.2 m (40 ft) but at a slightly smaller magnitude than in Nests TC and TD; the HDU-measurements show that the pressure head changes at Nest TB since the completion of the barrier were generally less than those at TC and TD, but more than those at TA. These results indicate that the TISB is performing as expected by intercepting the meteoric water from infiltrating into the soil, and the soil is becoming drier gradually. The barrier also had some effects on the soil below the barrier edge, but at a reduced magnitude. There was no significant difference in soil-water regime between the two nests in the TY tank farm because the barrier at the TY Farm was just completed one month before the end of the FY.

Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

2011-01-24T23:59:59.000Z

443

Interim report: Manipulation of natural subsurface processes: Field research and validation.  

SciTech Connect

Often the only alternative for treating deep subsurface contamination is in situ manipulation of natural processes to change the mobility or form of contaminants. However, the complex interactions of natural subsurface physical, chemical, and microbial processes limit the predictability of the system-wide impact of manipulation based on current knowledge. This report is a summary of research conducted to examine the feasibility of controlling the oxidation-reduction (redox) potential of the unconfined aquifer at the Hanford Site in southeastern Washington State by introducing chemical reagents and microbial nutrients. The experiment would allow the testing of concepts and hypotheses developed from fundamental research in the US Department of Energy`s (DOE`s) Subsurface Science Program. Furthermore, the achievement of such control is expected to have implications for in situ remediation of dispersed aqueous contaminants in the subsurface environment at DOE sites nationwide, and particularly at the Hanford Site. This interim report summarizes initial research that was conducted between July 1990 and October 1991.

Fruchter, J.S.; Spane, F.A.; Amonette, J.E. [and others

1994-11-01T23:59:59.000Z

444

Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012  

SciTech Connect

The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, and Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.

Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham; Heather D. Medema; Kirk Fitzgerald

2012-09-01T23:59:59.000Z

445

Power Transfer Potential to the Southeast in Response to a Renewable Portfolio Standard: Interim Report 1  

DOE Green Energy (OSTI)

The power transfer potential for bringing renewable energy into the Southeast in response to a renewable portfolio standard (RPS) will depend not only on available transmission capacity but also on electricity supply and demand factors. This interim report examines how the commonly used EIA NEMS and EPRI NESSIE energy equilibrium models are considering such power transfers. Using regional estimates of capacity expansion and demand, a base case for 2008, 2020 and 2030 are compared relative to generation mix, renewable deployments, planned power transfers, and meeting RPS goals. The needed amounts of regional renewable energy to comply with possible RPS levels are compared to inter-regional transmission capacities to establish a baseline available for import into the Southeast and other regions. Gaps in the renewable generation available to meet RPS requirements are calculated. The initial finding is that the physical capability for transferring renewable energy into the SE is only about 10% of what would be required to meet a 20% RPS. Issues that need to be addressed in future tasks with respect to modeling are the current limitations for expanding renewable capacity and generation in one region to meet the demand in another and the details on transmission corridors required to deliver the power.

Hadley, Stanton W [ORNL; Key, Thomas S [Electric Power Research Institute (EPRI)

2009-03-01T23:59:59.000Z

446

Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

Not Available

1994-07-01T23:59:59.000Z

447

Interim report:feasibility of microscale glucose reforming for renewable hydrogen.  

DOE Green Energy (OSTI)

Micro-scale aqueous steam reforming of glucose is suggested as a novel method of H{sub 2} production for micro fuel cells. Compact fuel cell systems are a viable alternative to batteries as a portable electrical power source. Compared with conventional lithium polymer batteries, hydrocarbon powered fuel cells are smaller, weigh less, and have a much higher energy density. The goal of this project is to develop a hydrocarbon powered microfuel processor capable of driving an existing microfuel cell, and this interim report provides a summary of the engineering information for microscale reforming of carbohydrates and the summarizes the work completed as of September 2006. Work on this program will continue. Gas analysis of the gas evolved from glucose breakdown using a quadrupole mass spectrometer is now possible due do significant modifications to the vacuum chamber and to the mass spectrometer electronics. Effective adhesion of Pt/Al{sub 2}O{sub 3} to 316SS microstructured catalyst plates is still under investigation. Electrophoretic and dip coat methods of catalyst deposition have produced coatings with poor adhesion and limited available Pt surface area.

Norman, Kirsten (New Mexico Institute of Mining and Technology, Socorro, NM)

2007-03-01T23:59:59.000Z

448

Operational Implementation of the MARSSIM Process at the Wayne Interim Storage Site  

DOE Green Energy (OSTI)

This paper describes the methodologies behind the operational implementation of the Multi Agency Radiation Site Survey and Investigation Manual (MARSSIM) process at the Wayne Interim Storage Site (WISS). The United States Army Corps of Engineers (USACE) and Environmental Chemical Corporation (ECC) have implemented the MARSSIM process using various surveys producing raw data. The final remedial status of a survey unit is derived through data reduction, while maintaining a high degree of efficiency in the construction aspects of the remedial action. Data reduction of field measurements is accomplished by merging the data outputs of a Digital Global Positioning System, an exposure rate meter, and laboratory analyses to produce maps which present exposure rates, elevations, survey unit boundaries, direct measurement locations, and sampling locations on a single map. The map serves as a data-posting plot and allows the project team to easily judge the survey unit's remedial status. The operational implementation of the MARSSIM process has been successful in determining the eligibility of survey units for final status surveys at the WISS and also in demonstrating final status radiological and chemical conditions while maintaining an efficient remedial action effort.

Hays, D. C. Jr.; Trujillo, P. A. IV.; Zoller, S. G.

2002-02-27T23:59:59.000Z

449

National climate change action plans: Interim report for developing and transition countries  

Science Conference Proceedings (OSTI)

Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

Benioff, R.; Ness, E.; Hirst, J. [eds.

1997-10-01T23:59:59.000Z

450

Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE`s Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957.

1994-06-01T23:59:59.000Z

451

Colonie Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP).

1994-06-01T23:59:59.000Z

452

Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri  

SciTech Connect

This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA.

Not Available

1993-05-01T23:59:59.000Z

453

Interim report on verification and benchmark testing of the NUFT computer code  

Science Conference Proceedings (OSTI)

This interim report presents results of work completed in the ongoing verification and benchmark testing of the NUFT (Nonisothermal Unsaturated-saturated Flow and Transport) computer code. NUFT is a suite of multiphase, multicomponent models for numerical solution of thermal and isothermal flow and transport in porous media, with application to subsurface contaminant transport problems. The code simulates the coupled transport of heat, fluids, and chemical components, including volatile organic compounds. Grid systems may be cartesian or cylindrical, with one-, two-, or fully three-dimensional configurations possible. In this initial phase of testing, the NUFT code was used to solve seven one-dimensional unsaturated flow and heat transfer problems. Three verification and four benchmarking problems were solved. In the verification testing, excellent agreement was observed between NUFT results and the analytical or quasianalytical solutions. In the benchmark testing, results of code intercomparison were very satisfactory. From these testing results, it is concluded that the NUFT code is ready for application to field and laboratory problems similar to those addressed here. Multidimensional problems, including those dealing with chemical transport, will be addressed in a subsequent report.

Lee, K.H.; Nitao, J.J. [Lawrence Livermore National Lab., CA (United States); Kulshrestha, A. [Weiss Associates, Emeryville, CA (United States)

1993-10-01T23:59:59.000Z

454

Behavior of spent nuclear fuel and storage system components in dry interim storage. Revision 1  

SciTech Connect

Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom; organic-cooled reactor (OCR) fuel (clad with a zirconium alloy) in silos in Canada; and boiling water reactor (BWR) fuel (clad with Zircaloy) in a metal storage cask in Germany. Dry storage demonstrations are under way for Zircaloy-clad fuel from BWRs, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions. 110 refs., 22 figs., 28 tabs.

Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

1983-02-01T23:59:59.000Z

455

Online Monitoring Technical Basis and Analysis Framework for Emergency Diesel Generators - Interim Report for FY 2013  

Science Conference Proceedings (OSTI)

The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned by Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.

Binh T. Pham; Nancy J. Lybeck; Vivek Agarwal

2012-12-01T23:59:59.000Z

456

Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.

Voskuil, T.L.

1993-09-01T23:59:59.000Z

457

Clean air program: Design guidelines for bus transit systems using alcohol fuel (methanol and ethanol) as an alternative fuel. Final report, July 1995-April 1996  

Science Conference Proceedings (OSTI)

This report provides design guidelines for the safe use of alcohol fuel (Methanol or Ethanol). It is part of a series of individual monographs being published by the FTA providing guidelines for the safe use of Compressed Natural Gas (CNG), Liquefied Natural Gas (LNG), Liquefied Petroleum Gas (LPG) and alcohol fuels (Methanol and Ethanol). Each report in this series describes, for the subject fuel, the important fuel properties, guidelines for the design and operation of bus fueling, storage and maintenance facilities, issues on personnel training and emergency preparedness.

Raj, P.K.; DeMarco, V.R.; Hathaway, W.T.; Kangas, R.

1996-08-01T23:59:59.000Z

458

Factors affecting the failure of copper connectors brazed to copper bus bar segments on a 615-MVA hydroelectric generator at Grand Coulee Dam  

DOE Green Energy (OSTI)

On March 21, 1986, the United States Bureau of Reclamation experienced a ground fault in the main parallel ring assembly of Unit G19 - a 615-MVA hydroelectric generator - at Grand Coulee Dam, Washington. Inspection of the unit revealed that the ground fault had been induced by fracture of one or more of the copper connectors used to join adjacent segments of one of the bus bars in the north half of the assembly. Various experimental techniques were used to detect and determine the presence of cracks, crack morphology, corrosion products, and material microstructure and/or embrittlement. The results of these inspections and recommendations are given. 7 refs., 27 figs.

Atteridge, D.G.; Klein, R.F.; Layne, R.; Anderson, W.E.; Correy, T.B.

1988-01-01T23:59:59.000Z

459

Low-temperature catalytic gasification of wet industrial wastes. FY 1991--1992 interim report  

DOE Green Energy (OSTI)

A catalytic gasification system operating in a pressurized water environment has been developed and refined at Pacific Northwest Laboratory (PNL) for over 12 years. Initial experiments were aimed at developing kinetics information for steam gasification of biomass in the presence of catalysts. The combined use of alkali and metal catalysts was reported for gasification of biomass and its components at low temperatures (350{degrees}C to 450{degrees}C). From the fundamental research evolved the concept of a pressurized, catalytic gasification system for converting wet biomass feedstocks to fuel gas. Extensive batch reactor testing and limited continuous reactor system (CRS) testing were undertaken in the development of this system under sponsorship of the US Department of Energy. A wide range of biomass feedstocks were tested, and the importance of the nickel metal catalyst was identified. Specific use of this process for treating food processing wastes was also studied. The concept application was further expanded to encompass cleanup of hazardous wastewater streams, and results were reported for batch reactor tests and continuous reactor tests. Ongoing work at PNL focuses on refining the catalyst and scaling the system to long-term industrial needs. The process is licensed as the Thermochemical Environmental Energy System (TEES{reg_sign}) to Onsite*Ofsite, Inc., of Duarte, California. This report is a follow-on to the 1989--90 interim report [Elliott et al. 1991], which reviewed the results of the studies conducted with a fixed-bed, continuous-feed, tubular reactor. The discussion here provides an overview of experiments on the wide range of potential feedstock materials conducted in a batch reactor; development of new catalyst materials; and tests performed in continuous-flow reactors at three scales. The appendices contain the history and background of the process development, as well as more detailed descriptions and results of the recent studies.

Elliott, D.C.; Neuenschwander, G.G.; Hart, T.R.; Phelps, M.R.; Sealock, L.J. Jr.

1993-07-01T23:59:59.000Z

460

Interim results from UO/sub 2/ fuel oxidation tests in air  

Science Conference Proceedings (OSTI)

An experimental program is being conducted at Pacific Northwest Laboratory (PNL) to extend the characterization of spent fuel oxidation in air. To characterize oxidation behavior of irradiated UO/sub 2/, fuel oxidation tests were performed on declad light-water reactor spent fuel and nonirradited UO/sub 2/ pellets in the temperature range of 135 to 250/sup 0/C. These tests were designed to determine the important independent variables that might affect spent fuel oxidation behavior. The data from this program, when combined with the test results from other programs, will be used to develop recommended spent fuel dry-storage temperature limits in air. This report describes interim test results. The initial PNL investigations of nonirradiated and spent fuels identified the important testing variables as temperature, fuel burnup, radiolysis of the air, fuel microstructure, and moisture in the air. Based on these initial results, a more extensive statistically designed test matrix was developed to study the effects of temperature, burnup, and moisture on the oxidation behavior of spent fuel. Oxidation tests were initiated using both boiling-water reactor and pressurized-water reactor fuels from several different reactors with burnups from 8 to 34 GWd/MTU. A 10/sup 5/ R/h gamma field was applied to the test ovens to simulate dry storage cask conditions. Nonirradiated fuel was included as a control. This report describes experimental results from the initial tests on both the spent and nonirradiated fuels and results to date on the tests in a 10/sup 5/ R/h gamma field. 33 refs., 51 figs., 6 tabs.

Campbell, T.K.; Gilbert, E.R.; Thornhill, C.K.; White, G.D.; Piepel, G.F.; Griffin, C.W.j

1987-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "bus evaluation interim" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Interim report on the Global Design Effort Global International Linear Collider (ILC) R&D  

Science Conference Proceedings (OSTI)

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong prop