1

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

2

Albeni Falls Wildlife Mitigation Project  

E-Print Network [OSTI]

from the Albeni Falls Hydroelectric Project #12;Biological Objective 1 Protect 900 acres of wetland hydroelectric project. · 1988 publication of the Final Report Albeni Falls Wildlife Protection, Mitigation effects on wildlife resulting from hydroelectric development. 2. Select target wildlife species

3

E-Print Network 3.0 - arctium lappa burdock Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Table 1). In this category, sweet clover Melilotus alba Medic., M. officinalis (L.) Pallas, burdock... (Arctium minus Schk., A. tomentosum Miller), and scentless false mayweed...

4

EIS-0397: Lyle Falls Fish Passage Project, WA  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to modify funding to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, WA. The proposed project would help BPA meet its off-site mitigation responsibilities for anadromous fish affected by the development of the Federal Columbia River Power System and increase overall fish production in the Columbia Basin.

5

Albeni Falls Wildlife Mitigation Project, 2001 Annual Report.  

SciTech Connect (OSTI)

The Albeni Falls Interagency Work Group was actively engaged in implementing wildlife mitigation activities in 2001. The Work Group met quarterly to discuss management and budget issues affecting the Albeni Falls Wildlife Mitigation Program. Work Group members protected 851 acres of wetland habitat in 2001. Wildlife habitat protected to date for the Albeni Falls project is approximately 5,248.31 acres ({approx}4,037.48 Habitat Units). Approximately 14% of the total wildlife habitat lost has been mitigated. Administrative activities increased as funding was more evenly distributed among Work Group members and protection opportunities became more time consuming. In 2001, Work Group members focused on development and implementation of the monitoring and evaluation program as well as completion of site-specific management plans. With the implementation of the monitoring and evaluation program, and as management plans are reviewed and executed, on the ground management activities are expected to increase in 2002.

Terra-Burns, Mary (Idaho Department of Fish and Game, Albeni Falls Interagency Work Group, Boise, ID)

2002-02-11T23:59:59.000Z

6

The Falling Price of Utility-Scale Solar Photovoltaic (PV) Projects...  

Office of Environmental Management (EM)

Solar Photovoltaic (PV) Projects The Falling Price of Utility-Scale Solar Photovoltaic (PV) Projects Data courtesy of National Renewable Energy Lab. Chart by Daniel Wood. View...

7

MATLAB PROJECTS INSTRUCTIONS, FALL 2013 The purpose of these MATLAB projects is for you to learn how linear algebra is  

E-Print Network [OSTI]

MATLAB PROJECTS INSTRUCTIONS, FALL 2013 MATH 215 The purpose of these MATLAB projects is for you to learn how linear algebra is used in applications, as well as to get familiar with MATLAB. You will work assignment is to study the descriptions of the projects you choose, and then use MATLAB to complete

Zakharov, Vladimir

8

National Bioenergy Center--Biochemical Platform Integration Project: Quarterly Update, Fall 2010  

SciTech Connect (OSTI)

Fall 2010 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: rapid analysis models for compositional analysis of intermediate process streams; engineered arabinose-fermenting Zymomonas mobilis strain.

Schell, D.

2010-12-01T23:59:59.000Z

9

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

10

RESEARCH PROJECTS & IDEAS FOR FALL 2013 Soil and Water Lab, Ecohydrology Group (compiled by Todd Walter)  

E-Print Network [OSTI]

NEW (ish) Aquatic Ecology and Hydraulic Fracturing (WRI/DEC, other) Maya Field work done; counting1 RESEARCH PROJECTS & IDEAS FOR FALL 2013 Soil and Water Lab, Ecohydrology Group (compiled by Todd and N- treatments Cayuga Lake watershed modeling (Cornell) Erin with Becky, Dan, and Brian Need to start

Walter, M.Todd

11

CISC 327 -Fall 2014 ! Course Project Assignment #5 -Back End Unit Testing!  

E-Print Network [OSTI]

CISC 327 - Fall 2014 ! ! Course Project Assignment #5 - Back End Unit Testing! !Due Wednesday Nov 19! !In this assignment, you will practice (partial) white box testing of the Back Office you programmed in assignment #4. ! !You are to create two separate sets of white box unit tests, one

Cordy, James R.

12

DESIGN OF FISH AND WILDLIFE PROJECTS (FW 370) Fall Semester, 2010  

E-Print Network [OSTI]

DESIGN OF FISH AND WILDLIFE PROJECTS (FW 370) Fall Semester, 2010 INSTRUCTOR: Dr. Will Clements in fish, wildlife and conservation biology. The course format will include lectures, group discussion Assignments and Homework......................................... 15% #12;FW 370- DESIGN OF FISH AND WILDLIFE

13

Site observational work plan for the UMTRA Project site at Falls City, Texas  

SciTech Connect (OSTI)

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

14

UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1  

SciTech Connect (OSTI)

Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344.

NONE

1995-09-01T23:59:59.000Z

15

Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2003.  

SciTech Connect (OSTI)

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, were located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, was located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving delisting goals established by National Marine Fisheries Service (NMFS or NOAA Fisheries) and ultimately to provide fall Chinook adults through the Lower Snake River Compensation Plan program as mitigation for construction and operation of the four lower Snake River dams. Complete adult returns (all age classes) for all three acclimation facilities occurred in the year 2002. Progeny (which would then be natural origin fish) would be counted towards achieving Endangered Species Act delisting criteria. In 2003, a total of 2,138,391 fish weighing 66,201 pounds were released from the three acclimation facilities. The total includes 437,633 yearling fish weighing 44,330 pounds and 1,700,758 sub-yearling fish weighing 21,871 pounds.

McLeod, Bruce

2004-01-01T23:59:59.000Z

16

Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site  

SciTech Connect (OSTI)

This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete.

NONE

1995-05-01T23:59:59.000Z

17

Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2002.  

SciTech Connect (OSTI)

Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, are located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, is located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving delisting goals established by National Marine Fisheries Service (NMFS or NOAA Fisheries) and ultimately to provide fall Chinook adults through the Lower Snake River Compensation Plan program as mitigation for construction and operation of the four lower Snake River dams. Complete adult returns (all age classes) for all three acclimation facilities occurred in the year 2002. Progeny (which would then be natural origin fish) would be counted towards achieving Endangered Species Act delisting criteria. In 2002, a total of 2,877,437 fish weighing 47,347 pounds were released from the three acclimation facilities. The total includes 479,358 yearling fish weighing 33,930 pounds and 2,398,079 sub-yearling fish weighing 19,115 pounds. This is the largest number of fish ever released in one year from the acclimation facilities.

McLeod, Bruce

2003-01-01T23:59:59.000Z

18

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.† The...

19

White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume I..  

SciTech Connect (OSTI)

Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developed to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost ratio of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. 28 figs., 23 tabs.

Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

1985-06-01T23:59:59.000Z

20

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2008  

SciTech Connect (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2008.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2008-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls Hydroelectric Project: Final technical and construction cost report  

SciTech Connect (OSTI)

The purpose of this report is to fulfill part of the requirement of the US Department of Energy (DOE) Cooperative Agreement Number FC07-80ID12125 of the Small Scale Hydropower Program and is submitted on behalf of the Broad River Electric Cooperative, Inc. of Gaffney, South Carolina. The project was initially studied in 1978 with construction commencing in January, 1984. The primary work elements of the project consisted of the renovation of an existing dam and a new powerhouse. The dam was rehabilitated and flashboards were installed along the top of the structure. The powerhouse was supplied with a single open pit turbine and a new substation was constructed. The project generated power in December of 1985 but has been plagued with numerous problems compounded by a flood in March, 1987 causing extensive damages. The flood of March, 1987 resulted in filing of litigative action by the developers against their project managers and engineers which has yet to reach settlement and will possibly culminate in court sometime during the fall of 1988.

Not Available

1988-06-01T23:59:59.000Z

22

Department of Industrial & Manufacturing Engineering Fall 2011 Mining Media Handling Project  

E-Print Network [OSTI]

Project Overview Metso wants to develop a media handling solution (machinery and/or process) to enhance that optimizes media discharge, recharge and liner maintenance procedures in accordance with the handling system

Demirel, Melik C.

23

ESD.36J / 1.432J System and Project Management, Fall 2003  

E-Print Network [OSTI]

The course is designed for students in the System Design and Management (SDM) program and therefore assumes that you already have a basic knowledge of project management. The objective is to introduce advanced methods and ...

Lyneis, James

24

11.471 Political Economy of Development Projects: Targeting the Poor, Fall 2007  

E-Print Network [OSTI]

This course treats public-sector policies, programs, and projects that attempt to reduce poverty and unemployment in developing countries through directly income-generating activities and employment. Topics covered are (1) ...

Tendler, Judith

25

Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.  

SciTech Connect (OSTI)

The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

Cousins, Katherine [Idaho Department of Fsh and Game

2009-04-03T23:59:59.000Z

26

Math 151 -Fall 2007 -Project #5 The Leslie Population Model in a Random Environment  

E-Print Network [OSTI]

individuals present then. Suppose that the population projection matrix is: P = 0 .5 0 1. 0 q F 0 0 in this range. Making use of the Matlab code in the file ranleslie.m, do the following: Calculate your value and standard deviations computed in (a) and (b), as well as by providing a graph of these results. Compose

Gross, Louis J.

27

EIS-0136: Special Isotope Separation Project Idaho National Engineering Laboratory, Idaho Falls, Idaho  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this EIS to provide environmental input to the decision to construct the Special Isotope Separation Project which would allow for the processing of existing fuel-grade plutonium into weapons-grade plutonium using the Atomic Laser Isotope Separation process.

28

DOE Office of Indian Energy Provides Tribes with Hands-On Support to Advance Tribal Energy Projects, Fall 2012 (Newsletter)  

SciTech Connect (OSTI)

This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Fall 2012.

Not Available

2012-10-01T23:59:59.000Z

29

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls, South Carolina: Final operations and maintenance report  

SciTech Connect (OSTI)

The purpose of this report is to give a final accounting of the costs and benefits derived from the first two years of operation of the Cherokee Falls, Broad River Hydroelectric Demonstration Project which was built at Cherokee Falls, South Carolina. Prior to construction, Broad River Electric Cooperative, Inc. (BREC) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-80ID12125 which provided $1,052,664 toward the construction of the facility. This agreement requires that BREC document for DOE a summary of the complete operating statistics, operating and maintenance cost, and revenues from power sales for a two-year operating period. A complete reporting covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report''. For this reason these elements will not be addressed in detail in this report. In order to make this account a more meaningful discussion of the initial two-year and four month production period, it is necessary to detail several unique events concerning the project which set Cherokee Falls apart from other projects developed under similar Cooperative Agreements with DOE. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, energy production, as well as the operation and maintenance cost and value of the power produced for the first 28 months of operation. 3 figs.

Not Available

1988-08-01T23:59:59.000Z

30

NWHA Fall Workshop & Tour  

Broader source: Energy.gov [DOE]

This yearís Fall Regional Workshop on October 30 will focus on extending the longevity of our legacy hydropower projects through upgrades, refurbishment and life extensions, while meeting needs of...

31

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2009; Composite Data Products, Final Version September 11, 2009  

SciTech Connect (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2009.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2009-09-01T23:59:59.000Z

32

Syllabus Fall 2014 | APS 1019 Leadership in Project Management | Dr. Haig Baronikian 1 A) Title: APS1019 Leadership in Project Management  

E-Print Network [OSTI]

people and managing resources to achieve the intended project outcomes and benefits. Leadership is often, Strategy and Project Management Vision, Mission and Values! Strategic Planning and the Balanced Scorecard and Project Management 2 Organizational Culture Organizational Culture plays one of the largest roles

Prodiæ, Aleksandar

33

2006 Fall Meeting Search Results  

E-Print Network [OSTI]

2006 Fall Meeting Search Results Cite abstracts as Author(s) (2006), Title, Eos Trans. AGU, 87 browsers. The iCronus project intends to create a publicly accessible website that contains published and weathering DE: 5475 Tectonics (8149) SC: Tectonophysics [T] MN: 2006 Fall Meeting #12;

Zreda, Marek

34

High-Temperature Falling-Particle Receiver  

Broader source: Energy.gov (indexed) [DOE]

| April 15, 2013 | Ho * This project employs modeling, design, testing, and optimization to further develop and improve key areas of falling particle receiver technology...

35

High-Temperature Falling-Particle Receiver  

Broader source: Energy.gov (indexed) [DOE]

| June 15, 2013 | Ho * This project employs modeling, design, testing, and optimization to further develop and improve key areas of falling particle receiver technology...

36

Fall 2012 FUPWG Meeting Welcome: Southern Company  

Broader source: Energy.gov [DOE]

Presentationógiven at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meetingócovers the Southern Company's retail service territory, financials, customers and sales, power generation, U.S. military projects, and more.

37

The rise and fall of presidential power in Iran.  

E-Print Network [OSTI]

??This project explores the power dynamics within the Iranian political system, asking what accounts for the rise and fall of a president's power relative toÖ (more)

Jacobsen, Donavan.

2008-01-01T23:59:59.000Z

38

Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

Chernoff, A.R. (USDOE Albuquerque Field Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. (Texas State Dept. of Health, Austin, TX (United States). Bureau of Radiation Control)

1992-09-01T23:59:59.000Z

39

Fall 2013 945 277 Fall 2013 190 115 Fall 2012 957 150 Fall 2012 158 41  

E-Print Network [OSTI]

-122010-112009-102008-092007-082006-072005-062004-052003-04 Degrees Awarded Certificate/ Associate Bachelor Graduate 0% 10% 20% 30% 40% 50% 60% Fall 2013 Fall 2012

Mohaghegh, Shahab

40

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

AGU Fall Meeting 2014  

Broader source: Energy.gov [DOE]

The American Geophysical Union's 47th Annual Fall Meeting will showcase groundbreaking research in the geosciences.

42

Enrollment Analysis Final for Fall 2014  

E-Print Network [OSTI]

) November 6, 2014 Project Request: Enrollment Analysis ­ Final for Fall 2014. Requested by: Dr. Brooks Keel, President; Dr. Teresa Thompson, Vice President, Student Affairs and Enrollment Management Project Abstract, progression, and graduation. Methodology: The following items and their sources are included in this report

Hutcheon, James M.

43

Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase I, Volume Two (A), Clark Fork Projects, Thompson Falls Dam, Operator, Montana Power Company.  

SciTech Connect (OSTI)

The Thompson Falls Dam inundated approximately 347 acres of wildlife habitat that likely included conifer forests, deciduous bottoms, mixed conifer-deciduous forests and grassland/hay meadows. Additionally, at least one island, and several gravel bars were inundated when the river was transformed into a reservoir. The loss of riparian and riverine habitat adversely affected the diverse wildlife community inhabiting the lower Clark Fork River area. Quantitative loss estimates were determined for selected target species based on best available information. The loss estimates were based on inundation of the habitat capable of supporting the target species. Whenever possible, loss estimates bounds were developed by determining ranges of impacts based on density estimates and/or acreage loss estimates. Of the twelve target species or species groups, nine were assessed as having net negative impacts. 86 refs., 2 figs., 5 tabs.

Wood, Marilyn

1984-03-27T23:59:59.000Z

44

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

45

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

46

Botswanafeaturing the VICTORIA FALLS  

E-Print Network [OSTI]

.alumni.jhu.edu AUGUST 6-19, 2015 #12;Victoria Falls N A T U R A L B E A U T Y | B O U N T I F U L W I L D L I F E | R IBotswanafeaturing the OKAVANGO DELTA plus VICTORIA FALLS AHI: 800-323-7373 www'll begin our journey with a visit to powerful Victoria Falls in Zambia, where you will take a sunset cruise

Weaver, Harold A. "Hal"

47

Idaho Falls Attractions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

48

FALL 2012 OU/SPC CAREER EXPERIENCE  

E-Print Network [OSTI]

FALL 2012 OU/SPC CAREER EXPERIENCE PROGRAM The Storm Prediction Center (SPC) and the OU School will spend between 8-10 hrs per week at the SPC working on a research project related to U.S. severe weather through this program. The student will also will have the opportunity to spend several days in the SPC

49

TOWARDS ROBUST FALL DETECTION Violeta Mirchevska1  

E-Print Network [OSTI]

on the healthcare expenditures, which already account for 9% of the EU's GDP spending [1]. The development with comprehensive monitoring and diagnostic data. The European FP7 project Confidence ­ Ubiquitous care system elderly user in real-time. It encompasses detection of falls as well as changes in behavior

Lu¬?trek, Mitja

50

Department of Electrical Engineering Fall 2009 Electridyne Motor  

E-Print Network [OSTI]

PENNSTATE Department of Electrical Engineering Fall 2009 Electridyne Motor Overview Our sponsored project was to design an elecrtic motor for an urban transportation vehicle, the challenges involved included research into motor design, consideration of the materials, and the electromagnetic parameters

Demirel, Melik C.

51

EE4435 Fall 2001 Design Project 3  

E-Print Network [OSTI]

used at remote mountain-top locations of microwave repeater equipment. A power-line or solar battery (48V) = 1.5 kHz Ī15 Hz, linear response between these values. ∑ Output power: Differential output, 1 mW into a 600 balanced load from a 600 balanced source. ∑ Output Ŗatness: Output power shall not deviate from

Leach Jr.,W. Marshall

52

PROJECTS & SERVICES COMMITTEE Fall 2009 Semester Report  

E-Print Network [OSTI]

produce selection at the Corner Store, investigation of a local hummus provider, and the elimination of wasteful packaging for produce at the Corner Store. Leah Spungen and the need for increased availability of food-factual information. Soy ice cream bars

Portman, Douglas

53

www.cpd.colostate.edu Annual Report, Fall 2007 Summer 2008  

E-Print Network [OSTI]

2008 Activities Major projects Deliberative Polling Event on Colorado Graduation Rates... 5 ·Fall 2007 Community Issues Forum.............................................. 6 ·Pathways Past Poverty project..................................................... 6 ·Science

54

The Sky is Falling  

E-Print Network [OSTI]

artificial ice crystals. Seeding takes place either below or above a cloud. In the first method, an aircraft's wings are mounted with flares burning silver iodide, which is then released beneath the cloud. The cloud's updraft carries the particles... enough to fall on their own. Silver iodide is a favored seeding agent because its crystalline composition is almost equal to the structure of ice crystals contained in convective clouds. Seeding with silver iodide can supply up to ten trillion...

Crawford, Amanda

2005-01-01T23:59:59.000Z

55

Math 226 Fall 2006  

E-Print Network [OSTI]

assignments and a take home final or written project at the end of the semester.. The homework will be listed on the webpage. Homework will be collected but†...

Ralph Kaufmann

2008-08-27T23:59:59.000Z

56

alamos science fall: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fall Term School and Major Department Fall 2007 Fall 2008 Fall 2009 Fall 2010 Fall 2011 Science 134 142 158 144 130 Electrical Engineering 110 118 131 127 126 Engineering...

57

Fall Run | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy andExsolutionFES6FYRANDOMOverview The6 Meeting of theFall Run

58

SAMPLE QUIZ 2 (Fall 2011)  

E-Print Network [OSTI]

Quiz 2. MA/STAT 416 003. Fall 2011. Show detailed explanations. 1. Purdue plays against ... Compute the probability that the second marble taken is white. b.

59

Page 1Exploring Materials, Fall 2013 continued on page 14  

E-Print Network [OSTI]

treating, materials testing, and corro- sion. His projects include the use of 3D printed sand molds cellular structure produced using a 3D printed sand mold #12;Page 2 Exploring Materials, Fall 2013 it is working with researchers in Mechanical Engineering, Engineering Science and Mechanics, Sustainable

Buehrer, R. Michael

60

CE 363 -TRANSPORTATION ENGINEERING AND PAVEMENT DESIGN Fall 2009 Course Syllabus  

E-Print Network [OSTI]

1 CE 363 - TRANSPORTATION ENGINEERING AND PAVEMENT DESIGN Fall 2009 Course Syllabus Catalog (4) CDT Course Syllabus D2L: The primary source for homework, solutions, design project activities, and other

Hickman, Mark

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

UESC Project Overview: NASA Ames Research Center  

Broader source: Energy.gov [DOE]

Presentationógiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingóprovides an overview of the NASA Ames Research Center's Utility Energy Services Contract (UESC) project.

62

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

63

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

64

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

65

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

66

MA 15400 ONLINE Fall 2014 Syllabus  

E-Print Network [OSTI]

MA 15400 ONLINE Fall 2014 Syllabus. TEXTBOOK. COURSE WEBSITE. RECORDED LESSONS. HOMEWORK. QUIZZES. EXAMS. CALCULATORS. OFFICE†...

Delworth, Timothy J

2014-09-14T23:59:59.000Z

67

RiverFalls,Wisconsin SolarinSmall  

E-Print Network [OSTI]

, the local government, and the citizens of River Falls have made energy conservation and renewable energy. Inspiring Interest in Renewables River Falls' energy conservation efforts benefit from RFMU's membership energy within the community.v Bringing Solar to River Falls The success of the River Falls Renewable

68

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

69

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

70

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

71

Cowlitz Falls Fish Passage.  

SciTech Connect (OSTI)

The upper Cowlitz was once home to native salmon and steelhead. But the combined impacts of overharvest, farming, logging and road building hammered fish runs. And in the 1960s, a pair of hydroelectric dams blocked the migration path of ocean-returning and ocean-going fish. The lower Cowlitz still supports hatchery runs of chinook, coho and steelhead. But some 200 river miles in the upper river basin--much of it prime spawning and rearing habitat--have been virtually cut off from the ocean for over 26 years. Now the idea is to trap-and-haul salmon and steelhead both ways and bypass previously impassable obstacles in the path of anadromous fish. The plan can be summarized, for the sake of explanation, in three steps: (1) trap and haul adult fish--collect ocean-returning adult fish at the lowermost Cowlitz dam, and truck them upstream; (2) reseed--release the ripe adults above the uppermost dam, and let them spawn naturally, at the same time, supplement these runs with hatchery born fry that are reared and imprinted in ponds and net pens in the watershed; (3) trap and haul smolts--collection the new generation of young fish as they arrive at the uppermost Cowlitz dam, truck them past the three dams, and release them to continue their downstream migration to the sea. The critical part of any fish-collection system is the method of fish attraction. Scientists have to find the best combination of attraction system and screens that will guide young fish to the right spot, away from the turbine intakes. In the spring of 1994 a test was made of a prototype system of baffles and slots on the upriver face of the Cowlitz Falls Dam. The prototype worked at 90% efficiency in early tests, and it worked without the kind of expensive screening devices that have been installed on other dams. Now that the success of the attraction system has been verified, Harza engineers and consultants will design and build the appropriate collection part of the system.

NONE

1995-09-01T23:59:59.000Z

72

EIS-0156: Cowlitz Falls Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of constructing and operating a proposed 70-megawatt hydroelectric dam and electrical infrastructure on the Cowlitz River near Morton and Randle, Washington. The U.S. Department of Energy's Bonneville Power Administration adopted this statement on 12/6/1990 to fulfil its National Environmental Policy Act requirement for its proposed action to acquire the power output from the Cowlitz Falls Hydroelectric Project.

73

Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st Year Sum. __________ (year)  

E-Print Network [OSTI]

Name Major Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st) Projected Graduation Date SUBJECT SUBJECT CR. HRS. SUBJECT COURSE # CR. HRS. Advisor Signature Date Student

Barrash, Warren

74

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

75

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

76

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

77

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

78

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

79

Lessons Learned: Peer Exchange Calls Fall 2014 | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Calls Fall 2014 Lessons Learned: Peer Exchange Calls Fall 2014 Better Buildings Residential Network, Lessons Learned: Peer Exchange Calls Fall 2014. Lessons Learned: Peer...

80

CMPE 185 Fall 1999 Syllabus 1 Syllabus  

E-Print Network [OSTI]

CMPE 185 Fall 1999 Syllabus 1 Syllabus 1 Administrative details Location and timeKresge 327, MWF 2;2 Syllabus CMPE 185 Fall 1999 4 Special guest lecturers I may arrange

Karplus, Kevin

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

CMPE 185 Fall 2000 Syllabus 1 Syllabus  

E-Print Network [OSTI]

CMPE 185 Fall 2000 Syllabus 1 Syllabus 1 Administrative details Location and timeKresge 327, MWF 2 Info 1 #12;2 Syllabus CMPE 185 Fall 2000 4

Karplus, Kevin

82

Fall 2013 Composite Data Products - Backup Power  

SciTech Connect (OSTI)

This report includes 28 composite data products (CDPs) produced in Fall 2013 for fuel cell backup power systems.

Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.

2013-12-01T23:59:59.000Z

83

City of Klamath Falls, Oregon Geothermal Power Plant Feasibility Study  

SciTech Connect (OSTI)

The purpose of the Klamath Falls project is to demonstrate the effectiveness of a combined thermal distribution system and power generation facility. The city of Klamath Falls operates a geothermal district heating system which would appear to be an attractive opportunity to install a power generation system. Since the two wells have operated reliably and consistently over many years, no new sources or resource exploration would be necessary. It appears that it will cost more to construct, operate, maintain and amortize a proposed geothermal facility than the long?term value of the power it would produce. The success of a future project will be determined by whether utility power production costs will remain low and whether costs of construction, operations, or financing may be reduced. There are areas that it would be possible to reduce construction cost. More detailed design could enable the city to obtain more precise quotes for components and construction, resulting in reduction in contingency projections. The current level of the contingency for uncertainty of costs is between $200,000 and $300,000. Another key issue with this project appears to be operation cost. While it is expected that only minimal routine monitoring and operating expenses will occur, the cost of water supply and waste water disposal represents nearly one quarter of the value of the power. If the cost of water alone could be reduced, the project could become viable. In addition, the projected cost of insurance may be lower than estimated under a city?wide policy. No provisions have been made for utilization of federal tax incentives. If a transaction with a third-party owner/taxpayer were to be negotiated, perhaps the net cost of ownership could be reduced. It is recommended that these options be investigated to determine if the costs and benefits could be brought together. The project has good potential, but like many alternative energy projects today, they only work economically if the federal tax incentives come into play.

Brian Brown, PE; Stephen Anderson, PE, Bety Riley

2011-07-31T23:59:59.000Z

84

Analysis of rock-fall and rock-fall avalanche seismograms in the French Alps  

E-Print Network [OSTI]

the source rock slope (Figure 1), the falling mass strikes the talus slope and breaks up and/or bounces1 Analysis of rock-fall and rock-fall avalanche seismograms in the French Alps J. Deparis, D reviews seismograms from 10 rock-fall events recorded between 1992 and 2001 by the permanent seismological

Paris-Sud XI, Universitť de

85

almahata sitta fall: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Theory of Systems of First Order Linear Equations. 37 MGMT 585 2013 Fall1 2013 Fall Syllabus Mathematics Websites Summary: MGMT 585 2013 Fall1 2013 Fall Syllabus MGMT 585:...

86

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

87

MAF560 Fall 2010 Instructor  

E-Print Network [OSTI]

the class materials from the 2 previous weeks. Group Project: There will be an individual class project. You/marine policy applications using ArcGIS 10. Class Materials: All class materials are available from UM Project : 30% Weekly Quizzes: There will be a 20 minute quiz every second Monday. The quiz will cover

Miami, University of

88

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

89

Introduction to GIS and Geospatial Analysis Project Presentation  

E-Print Network [OSTI]

GIS 551 Introduction to GIS and Geospatial Analysis Fall 2011 Project Presentation Date Presenter and White-tailed Deer Analysis and Management Plan Using GIS 12-8 Amy Urbanovsky & Ricardo Romero Bike Racks

Hung, I-Kuai

90

Introduction to GIS and Geospatial Analysis Project Presentation  

E-Print Network [OSTI]

GIS 551 Introduction to GIS and Geospatial Analysis Fall 2012 Project Presentation Date Presenter Zhengyi Wang GIS Tools for Hydrology Analysis 12-6 Ross Maynard Melissa Bozarth Using GIS to Evaluate

Hung, I-Kuai

91

A fully relativistic radial fall  

E-Print Network [OSTI]

Radial fall has historically played a momentous role. It is one of the most classical problems, the solutions of which represent the level of understanding of gravitation in a given epoch. A {\\it gedankenexperiment} in a modern frame is given by a small body, like a compact star or a solar mass black hole, captured by a supermassive black hole. The mass of the small body itself and the emission of gravitational radiation cause the departure from the geodesic path due to the back-action, that is the self-force. For radial fall, as any other non-adiabatic motion, the instantaneous identity of the radiated energy and the loss of orbital energy cannot be imposed and provide the perturbed trajectory. In the first part of this letter, we present the effects due to the self-force computed on the geodesic trajectory in the background field. Compared to the latter trajectory, in the Regge-Wheeler, harmonic and all others smoothly related gauges, a far observer concludes that the self-force pushes inward (not outward) the falling body, with a strength proportional to the mass of the small body for a given large mass; further, the same observer notes an higher value of the maximal coordinate velocity, this value being reached earlier on during infall. In the second part of this letter, we implement a self-consistent approach for which the trajectory is iteratively corrected by the self-force, this time computed on osculating geodesics. Finally, we compare the motion driven by the self-force without and with self-consistent orbital evolution. Subtle differences are noticeable, even if self-force effects have hardly the time to accumulate in such a short orbit.

Alessandro D. A. M. Spallicci; Patxi Ritter

2014-07-21T23:59:59.000Z

92

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

93

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

94

Condensed Matter Theory Center Fall 2009 Symposium  

E-Print Network [OSTI]

Condensed Matter Theory Center Fall 2009 Symposium September 28 - October 2, 2009 2202 Physics Barnett, "Vortex lattice locking in rotating BECs and spinor condensates" Maxim Dzero, "Cooper pair

Lathrop, Daniel P.

95

STAT 490 Fall 2012 Test 2  

E-Print Network [OSTI]

STAT 490. Fall 2012. Test 2. October 30, 2012. 1. Datsenka Dog Insurance Company has developed the following mortality table for dogs: Age xl. Age xl. 0.

Owner

2014-06-29T23:59:59.000Z

96

Chemistry of Organic Electronic Materials 6483-Fall  

E-Print Network [OSTI]

Chemistry of Organic Electronic Materials 6483- Fall Tuesdays organic materials. The discussion will include aspects of synthesis General introduction to the electronic structure of organic materials with connection

Sherrill, David

97

Idaho Falls Power- Residential Weatherization Loan Program  

Broader source: Energy.gov [DOE]

Residential customers with permanently installed electric heat who receive service from the City of Idaho Falls, are eligible for 0% weatherization loans. City Energy Service will conduct an...

98

Course Announcement MATH 450 -Fall 2005  

E-Print Network [OSTI]

Course Announcement MATH 450 - Fall 2005 Mathematical Modeling of the Physical World Time: TR 9://www.math.psu.edu/belmonte/math450 05.html #12;

99

High-Temperature Falling-Particle Receiver  

Broader source: Energy.gov (indexed) [DOE]

temperatures, nitrate salt fluids become chemically unstable. In contrast, direct absorption receivers using solid particles that fall through a beam of concentrated solar...

100

Fall 2012 SEMESTER OU/SPC CAREER EXPERIENCE PROGRAM APPLICATION FORM  

E-Print Network [OSTI]

Fall 2012 SEMESTER OU/SPC CAREER EXPERIENCE PROGRAM APPLICATION FORM OVERVIEW The Storm Prediction Center (SPC) and OU School of Meteorology (SoM) Career Experience Program is an unpaid, "for credit between 8-10 hours per week (3 credit hours of METR 3890) at the SPC working on a research project related

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

STAT 152: Introduction to Statistics -Fall 2013 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

STAT 152: Introduction to Statistics - Fall 2013 Department of Mathematics and Statistics TA or the instructor during our office hours. Course Description and Prerequisites: STAT 152://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge of MINITAB will help you with your statistical projects long after we

Kozubowski, Tomasz J.

102

STAT 152: Introduction to Statistics -Fall 2012 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

STAT 152: Introduction to Statistics - Fall 2012 Department of Mathematics and Statistics TA or the instructor during our office hours. Course Description and Prerequisites: STAT 152://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge of MINITAB will help you with your statistical projects long after we

Kozubowski, Tomasz J.

103

Department of Industrial Engineering Fall 2011 KYDEX LLC 1: Reduce Masterbatch Inventory  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Fall 2011 KYDEX LLC 1: Reduce Masterbatch Inventory Overview KYDEX has a high inventory of masterbatch (the pigment they use to color their plastic sheets). As of October 2011, there was about 300,000 lbs. of masterbatch (MB) in inventory. This project required

Demirel, Melik C.

104

Department of Mechanical Engineering Fall 2012 Unmanned Underwater Vehicle Test Tank and Obstacle Course  

E-Print Network [OSTI]

PENNSTATE Department of Mechanical Engineering Fall 2012 Unmanned Underwater Vehicle Test Tank and Obstacle Course Overview The purpose of this project is to design and build a test tank to showcase multiple UUVs in a competition. The tank will be vital in demonstrating the abilities of the UUVs

Demirel, Melik C.

105

GEOL 663 -GEOLOGICAL ASPECTS OF OFFSHORE WIND COURSE SYLLABUS 2014 Fall Semester  

E-Print Network [OSTI]

GEOL 663 - GEOLOGICAL ASPECTS OF OFFSHORE WIND COURSE SYLLABUS ­ 2014 Fall Semester Course Meets will be designed around geological and geotechnical topics that are relevant to the development of offshore wind wind turbine foundations; 2) A review of existing, or under construction, offshore wind projects; and 3

Delaware, University of

106

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

107

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

108

Fall 2013 Edition Editor-in-Chief  

E-Print Network [OSTI]

Musings of Brescia Fall 2013 Edition Editor-in-Chief Alicia Moore Editor Shelly Harder #12, rousing him from a nap. I held him up by one gangly, black arm. His marble brown eyes were shiny always occurred to me that TJ could fall apart at any moment. His arms were already feeling a bit loose

Lennard, William N.

109

Population Analysis, Fall 2005 1 Population Analyses  

E-Print Network [OSTI]

Population Analysis, Fall 2005 1 Population Analyses EEOB/AEcl 611 Fall Semester 2005 Scheduled Phone: 294-5176 email: wrclark@iastate.edu AEcl 611 is evolving in response to very rapid changes. The emphasis in AEcl 611 is on understanding the statistical basis of various analytical techniques, applying

Clark, William R.

110

FALL 2011 DEAN'S LIST A Nicole Butler  

E-Print Network [OSTI]

Duvall #12;FALL 2011 DEAN'S LIST E H John Eickhoff Michael Haas Nicole Eley Christopher Hall Kierstin Fountain Jordan Holland April Fox Timothy Holmer Jessica Frey Wilson Holoweski Samuel Horning G Shannon Guerrero Ian Gulland #12;FALL 2011 DEAN'S LIST K Lejdi Malo Keri Kahn Heather Marks John Kalogerakos

Berdichevsky, Victor

111

CURRICULUM VITAE Andrs Fall, Ph.D.  

E-Print Network [OSTI]

-0140 Cell: (512) 810-2335 Updated: May 20, 2014 Academic Background 2005-2008 Ph.D. Virginia Tech-poor to 4-excellent. #12;Dr. Andr√°s Fall - Vitae 3 Selected Publications Peer reviewed journal articles in shale: a review. Accepted pending revisions, AAPG Bulletin. 7. Fall, A., Eichhubl, P., Bodnar, R

Yang, Zong-Liang

112

CHEMICAL ENGINEERING Fall Term Spring Term  

E-Print Network [OSTI]

CHEMICAL ENGINEERING CURRICULUM FALL 2010 Fall Term Spring Term EGGG 101 Introduction to Chemical Engineering 3 MATH 242 Analytic Geometry & Calculus B 4 MATH 243 Analytic Geometry & Calculus C 4 Critical Reading and Writing 3 Breadth Requirement Elective 1 3 15 17 CHEG 231 Chemical Engineering

Lee, Kelvin H.

113

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

114

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

115

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

116

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base†...

rroames

2010-01-12T23:59:59.000Z

117

Snake River Fall Chinook Salmon Life History Investigations, Annual Report 2008.  

SciTech Connect (OSTI)

This study was initiated to provide empirical data and analyses on the dam passage timing, travel rate, survival, and life history variation of fall Chinook salmon that are produced in the Clearwater River. The area of interest for this study focuses on the lower four miles of the Clearwater River and its confluence with the Snake River because this is an area where many fish delay their seaward migration. The goal of the project is to increase our understanding of the environmental and biological factors that affect juvenile life history of fall Chinook salmon in the Clearwater River. The following summaries are provided for each of the individual chapters in this report.

Tiffan, Kenneth F. [U.S. Geological Survey; Connor, William P. [U.S. Fish and Wildlife Service; Bellgraph, Brian J. [Pacific Northwest National Laboratory

2009-09-15T23:59:59.000Z

118

Fall Lectures Feature Life of Einstein; Exploring Our World With...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fall Lectures Feature Life of Einstein; Exploring Our World With Particle Accelerators NEWPORT NEWS, Va., Sept. 22, 2010 - Jefferson Lab's first 2010 Fall Science Series lecture,...

119

Jefferson Lab Fall Lecture: Exploring Our World With Particle...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fall Lecture: Exploring Our World With Particle Accelerators NEWPORT NEWS, Va., Nov. 9, 2010 - Jefferson Lab's 2010 Fall Science Lecture Series concludes on Tuesday, Nov. 23, with...

120

Algal Biofuels Strategy Workshop - Fall Event | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Fall Event Algal Biofuels Strategy Workshop - Fall Event The U.S. Department of Energy's (DOE) Bioenergy Technologies Office's (BETO's) Algae Program hosted the Algal Biofuels...

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

122

ns Notes and Documentation1 The VINT Project  

E-Print Network [OSTI]

, LBL, USC/ISI, and Xerox PARC. Kevin Fall hkfall@ee.lbl.govi, Editor Kannan Varadhan hkannan) the interface code to the OTcl interpreter is separate from the main simulator. 1The VINT project is a joint effort by people from UC Berkeley, USC/ISI, LBL, and Xerox PARC. The project is supported by the Defense

Johnson, David B.

123

ns Notes and Documentation 1 The VINT Project  

E-Print Network [OSTI]

, LBL, USC/ISI, and Xerox PARC. Kevin Fall hkfall@ee.lbl.govi, Editor Kannan Varadhan hkannan) the interface code to the OTcl interpreter is separate from the main simulator. 1 The VINT project is a joint effort by people from UC Berkeley, USC/ISI, LBL, and Xerox PARC. The project is supported by the Defense

Johnson, David B.

124

CE 4990 -Construction Scheduling Week 1: Steel Frame Project  

E-Print Network [OSTI]

CE 4990 - Construction Scheduling Week 1: Steel Frame Project Fall 2011 January 13, 2012 Introduction You are a construction manager for a project to build a steel frame for an office building1 of 964 pre-fabricated structural steel members will be used in the construction. The standard bay size

Mukherjee, Amlan

125

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

126

24 Fall 2010 Explore 25  

E-Print Network [OSTI]

degrees, so the Florida Cracker-inspired house UF students and faculty designed and built for the Solar. The sensibilities offered by the design, such as natural, modular design and porous skin, allowed for passive ways to the Villa Solar on the mall in front of Spain's Royal Palace flocked to UF's Project RE:FOCUS house to get

Guo, Jing

127

Klamath Falls geothermal field, Oregon  

SciTech Connect (OSTI)

Klamath Falls, Oregon, is located in a Known Geothermal Resource Area which has been used by residents, principally to obtain geothermal fluids for space heating, at least since the turn of the century. Over 500 shallow-depth wells ranging from 90 to 2,000 ft (27 to 610 m) in depth are used to heat (35 MWt) over 600 structures. This utilization includes the heating of homes, apartments, schools, commercial buildings, hospital, county jail, YMCA, and swimming pools by individual wells and three district heating systems. Geothermal well temperatures range from 100 to 230{degree}F (38 to 110{degree}C) and the most common practice is to use downhole heat exchangers with city water as the circulating fluid. Larger facilities and district heating systems use lineshaft vertical turbine pumps and plate heat exchangers. Well water chemistry indicates approximately 800 ppM dissolved solids, with sodium sulfate having the highest concentration. Some scaling and corrosion does occur on the downhole heat exchangers (black iron pipe) and on heating systems where the geo-fluid is used directly. 73 refs., 49 figs., 6 tabs.

Lienau, P.J.; Culver, G.; Lund, J.W.

1989-09-01T23:59:59.000Z

128

Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2  

SciTech Connect (OSTI)

The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas.

NONE

1996-11-01T23:59:59.000Z

129

STAT 416 Fall 2014 Homework 6 Solutions  

E-Print Network [OSTI]

Nov 3, 2014 ... STAT 416 Fall 2014. Homework 6 Solutions ... 4.35 Let X denote the winnings. P (X = 1.1) = P (both marbles red) + P (both marbles blue) = 2. (5.

2014-11-03T23:59:59.000Z

130

Cedar Falls Utilities- Residential New Construction Program  

Broader source: Energy.gov [DOE]

Cedar Falls Utilities offers incentives to residential customers who construct new energy efficient homes. A rate discount of 25% is available to customers who meet the 5 Star Home Program criteria...

131

Fall Back Daylight Savings time is November  

E-Print Network [OSTI]

Fall Back ­ Daylight Savings time is November 2nd.The Energy Policy Act of 2005 changed both the starting and ending dates. Beginning in 2007, daylight time starts on the second Sunday in March and ends

Linsley, Braddock K.

132

CHEMICAL ENGINEERING Fall 2013-Winter 2014  

E-Print Network [OSTI]

ADVANCED CHEMICAL ENGINEERING Fall 2013-Winter 2014 Certificate Program CONTINUING AND PROFESSIONAL EDUCATIONCONTINUING AND PROFESSIONAL EDUCATION #12;About the Advanced Chemical Engineering Certificate Program The new Advanced Chemical Engineering Certificate Program offers professionals in chemi- cal engineering

California at Davis, University of

133

River Falls Municipal Utilities- Distributed Solar Tariff  

Broader source: Energy.gov [DOE]

River Falls Municipal Utilities (RFMU), a member of WPPI Energy, offers a special energy purchase rate to its customers that generate electricity using solar photovoltaic (PV) systems. The special...

134

DEAN'S LIST HONORABLE MENTION Fall Semester 2010  

E-Print Network [OSTI]

DEAN'S LIST HONORABLE MENTION Fall Semester 2010 Brown, Bryant P. Brown, Dustin H. Campbell Laughlin, Amanda Diane Lemieux, Sydnie Lynn Lesnewski, Michael Phillip Lester, David Ernest Li, Crystal Gan

Wong, Pak Kin

135

e University of Min nthony Falls La  

E-Print Network [OSTI]

. The turbine was placed in a water flume at the St. Anthony Falls Laboratory at the University of Minnesota under subcritical conditions. A circular cylinder was placed upstream of the turbine to induce

Minnesota, University of

136

Utility Variable Generation Integration Group Fall Technical...  

Broader source: Energy.gov (indexed) [DOE]

Technical Workshop Utility Variable Generation Integration Group Fall Technical Workshop October 15, 2014 9:00AM CDT to October 17, 2014 3:00PM CDT The Utility Variable Generation...

137

Math 373 Fall 2013 Test 1  

E-Print Network [OSTI]

Math 373. Fall 2013. Test 1. September 26, 2013. 1. Zach buys a billiards table for his apartment. The cost of the table is 4000 and he uses a loan to pay for the†...

jeffb_000

2014-01-14T23:59:59.000Z

138

STAT 472 Fall 2013 Test 2  

E-Print Network [OSTI]

STAT 472. Fall 2013. Test 2. October 31, 2013. 1. (6 points) Yifei who is (45) is receiving an annuity with payments of 25,000 at the beginning of each year.

jeffb_000

2014-12-10T23:59:59.000Z

139

Math 373 Fall 2012 Test 2  

E-Print Network [OSTI]

Copyright Jeffrey A Beckley. Math 373. Fall 2012. Test 2. October 18, 2012. 1. Jordan has the option to purchase either of the two bonds below. Both bonds will

Owner

2014-06-29T23:59:59.000Z

140

Environmental Research Group 2014 Fall Seminar Series  

E-Print Network [OSTI]

Environmental Research Group 2014 Fall Seminar Series October 24, 2014 Gregg 320, 12:00 ≠ 1 of five hours, the city of Boston would have sustained even more damage from Hurricane Sandy than New York

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Quantifying Temperature Effects on Fall Chinook Salmon  

SciTech Connect (OSTI)

The motivation for this study was to recommend relationships for use in a model of San Joaquin fall Chinook salmon. This report reviews literature pertaining to relationships between water temperature and fall Chinook salmon. The report is organized into three sections that deal with temperature effects on development and timing of freshwater life stages, temperature effects on incubation survival for eggs and alevin, and temperature effects on juvenile survival. Recommendations are made for modeling temperature influences for all three life stages.

Jager, Yetta [ORNL

2011-11-01T23:59:59.000Z

142

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied†...

143

Interior cavern conditions and salt fall potential  

SciTech Connect (OSTI)

A relatively large number of salt caverns are used for fluid hydrocarbon storage, including an extensive set of facilities in the Gulf Coast salt domes for the Strategic Petroleum Reserve (SPR) Program. Attention is focused on the SPR caverns because of available histories that detail events involving loss and damage of the hanging string casing. The total number of events is limited, making the database statistically sparse. The occurrence of the events is not evenly distributed, with some facilities, and some caverns, more susceptible than others. While not all of these events could be attributed to impacts from salt falls, many did show the evidence of such impacts. As a result, a study has been completed to analyze the potential for salt falls in the SPR storage caverns. In this process, it was also possible to deduce some of the cavern interior conditions. Storage caverns are very large systems in which many factors could possibly play a part in casing damage. In this study, all of the potentially important factors such as salt dome geology, operational details, and material characteristics were considered, with all being logically evaluated and most being determined as secondary in nature. As a result of the study, it appears that a principal factor in determining a propensity for casing damage from salt falls is the creep and fracture characteristics of salt in individual caverns. In addition the fracture depends strongly upon the concentration of impurity particles in the salt. Although direct observation of cavern conditions is not possible, the average impurity concentration and the accumulation of salt fall material can be determined. When this is done, there is a reasonable correlation between the propensity for a cavern to show casing damage events and accumulation of salt fall material. The accumulation volumes of salt fall material can be extremely large, indicating that only a few of the salt falls are large enough to cause impact damage.

Munson, D.E.; Molecke, M.A. [Sandia National Labs., Albuquerque, NM (United States); Myers, R.E. [Strategic Petroleum Reserve, New Orleans, LA (United States)

1998-03-01T23:59:59.000Z

144

Classes Entering Fall 2009 and Fall 2010 Last Name: First Name: Middle Ini2al  

E-Print Network [OSTI]

Classes Entering Fall 2009 and Fall 2010 Last Name: First Name: Middle Ini2 ini2als for agreement: Date: From the courses listed in the tables above, iden2fy Wri2ng Advisor Approved Ini2als: Date: Probability & Sta2s2cs Final ECE Approval: Advanced

Afshari, Ehsan

145

China's forest products trade falls nearly 18% China's forest products trade falls nearly 18%  

E-Print Network [OSTI]

China's forest products trade falls nearly 18% China's forest products trade falls nearly 18% 11/08/2009 - 09:05 According to China's latest Customs statistics, foreign trade of China's forest products in the first five months showed a year-on-year general downturn. The total value of foreign trade of China

146

16 R&D Projects Across 11 States to Advance Hydropower in U.S...  

Office of Environmental Management (EM)

canals and low height dams to using reservoirs for energy storage, to deploying a fish-friendly turbine. The 16 projects fall under one of four approaches to advancing...

147

Electronic Out-fall Inspection Application - 12007  

SciTech Connect (OSTI)

In early 2009 an exciting opportunity was presented to the Geographic Information Systems (GIS) team at the Savannah River Site (SRS). The SRS maintenance group was directed to maintain all Out-falls on Site, increasing their workload from 75 to 183 out-falls with no additional resources. The existing out-fall inspection system consisted of inspections performed manually and documented via paper trail. The inspections were closed out upon completion of activities and placed in file cabinets with no central location for tracking/trending maintenance activities. A platform for meeting new improvements required for documentation by the Department of Health and Environmental Control (DHEC) out-fall permits was needed to replace this current system that had been in place since the 1980's. This was accomplished by building a geographically aware electronic application that improved reliability of site out-fall maintenance and ensured consistent standards were maintained for environmental excellence and worker efficiency. Inspections are now performed via tablet and uploaded to a central point. Work orders are completed and closed either in the field using tablets (mobile application) or in their offices (via web portal) using PCs. And finally completed work orders are now stored in a central database allowing trending of maintenance activities. (authors)

Weymouth, A Kent III; Pham, Minh; Messick, Chuck [Savannah River Nuclear Solutions, Aiken, South Carolina 29808 (United States)

2012-07-01T23:59:59.000Z

148

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

149

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

150

Seismic and Acoustic Investigations of Rock Fall Initiation, Processes, and Mechanics  

E-Print Network [OSTI]

systems †and †rock †fall †source †and †impact †areas, †it †meters †from †a †rock †fall †source †area. † The † success †possible †to †the †rock †fall †source †areas, † spacing †

Zimmer, Valerie Louise

2011-01-01T23:59:59.000Z

151

You have remarkable ideas. share them at the Falling Walls lab!  

E-Print Network [OSTI]

of the falling wallS lab + conference berlin 8/9 nov 2012 aPPlYnoW!www.falling-walls.com/lab THE FALLING WALLS

Heermann, Dieter W.

152

CHEMISTRY 324W Fall 2010 ORGANIC LABORATORY  

E-Print Network [OSTI]

1 CHEMISTRY 324W Fall 2010 ORGANIC LABORATORY Lecture: ...................Monday and Friday 2 book for over 10,000 important organic substances. It has a handy cross index and molecular formula.) Advanced Organic Chemistry: Reactions, Mechanisms, and Structure by March (McGraw-Hill) is particularly

Wagner, Diane

153

CHEMISTRY 3311, Fall 1997 Professor Walba  

E-Print Network [OSTI]

Name: -1- CHEMISTRY 3311, Fall 1997 Professor Walba Third Hour Exam November 20, 1997 scores: 1) 2 This is a closed-book "open model" exam. You may use models, but no notes or books. Please put all your answers: -3- 2) (25 pts) Give the single major organic product (or two products if more than one major product

Walba, David

154

CMSC 311101 (Fall 1995) Professor: TA  

E-Print Network [OSTI]

CMSC 311­101 (Fall 1995) Professor: TA: Dr. Jeff Hollingsworth Shekhar Patankar 4161 AV Williams 1109 A V Williams (40) 5­2708 hollings@cs.umd.edu shekhar@cs.umd.edu Office Hours: Tu 1:00­2:30 W 10

Hollingsworth, Jeffrey K.

155

CMSC 714 (Fall 2010) Dr. Jeff Hollingsworth  

E-Print Network [OSTI]

CMSC 714 (Fall 2010) Professor: Dr. Jeff Hollingsworth 4155 AV Williams (40) 5-2708 hollings@cs.umd.edu Office Hours: Tu/Th 11:00-12:00 TA: Derek Monner 1112 AV Williams dmonner@cs.umd.edu Office Hours: TBA

Hollingsworth, Jeffrey K.

156

FINANCE DEPARTMENT Office Hours Fall 2014  

E-Print Network [OSTI]

FINANCE DEPARTMENT Office Hours Fall 2014 NAME OFFICE HOURS COURSE # COURSE TITLE DAY TIME ROOM-1515 and by appointment FIN 323.8 FIN 323.9 FIN 323.11 FIN 326.1 Fundamentals of Finance Fundamentals of Finance Fundamentals of Finance Financial Institution Mgt TTH TTH TH TTH 0930-1045 1100-1215 1600-1840 1230-1345 GMCS

Gallo, Linda C.

157

Condensed Matter Theory Center Fall 2010 Symposium  

E-Print Network [OSTI]

Condensed Matter Theory Center Fall 2010 Symposium November 2-4, 2010 2205 Physics Building bosons" Ryan Barnett, "Quantum dynamics in ferromagnetic and antiferromagnetic condensates" Hoi Yin Hui" Qi Zhou, "Inter-band coupling induced novel condensates in a double-well lattice" November 3, 2010

Lathrop, Daniel P.

158

Condensed Matter Theory Center 2011 Fall Symposium  

E-Print Network [OSTI]

Condensed Matter Theory Center 2011 Fall Symposium October 3 & 4, 2011 2205 Physics Building and Collective Modes in Fermionic Condensates with Bragg Scattering" Benjamin Fregoso "Degenerate FloquetEinstein condensates" Tuesday, October 4 Afternoon Session: 25:30pm ChienHung Lin "Stabilizing topological

Lathrop, Daniel P.

159

CALIFORNIA DREAMIN' IGHSPA 2013 FALL CONFERENCE  

E-Print Network [OSTI]

CALIFORNIA DREAMIN' IGHSPA 2013 FALL CONFERENCE Bill Martin built an air-sourced heat pump home of the country's population, represents only 2.3 percent of ground source heat pump activity ....." Source instructor. Efficiency in residential design is his passion, and GHPs are his favorite technology. He

160

High Noon Lecture Series 2012 Fall Schedule  

E-Print Network [OSTI]

signed the Affordable Care Act into law. Some health insurance reforms have already taken place at how important arenas of constitutional law, from health care reform to abortion to affirmative actionHigh Noon Lecture Series 2012 Fall Schedule September 19 "Deciphering the Affordable Care Act" Glen

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Inside this issue: New this fall 1  

E-Print Network [OSTI]

.albany.edu/gogreen. Interesting in trying vanpooling? Want to car- pool but don't know how to find someone to share the ride of Environmental Sustainability Sustainability Bulletin New this fall Car sharing Rent cars on an hourly basis the week following the program for any group interested in trying it out. The car- pooling service features

Linsley, Braddock K.

162

ECONOMIC EMERGENCY PROGRAM International Falls Plant Shutdown  

E-Print Network [OSTI]

Falls. An additional 35 jobs within the corporate structure will also be affected. As the community The manufacturing industry employs 1,100 of those workers, or approximately 17 percent of all jobs, thus making is classified as a manufacturing business. Of the 1,100 manufacturing jobs in Koochiching County, 900

Amin, S. Massoud

163

STAT 3843A Fall 2013 Assignment 2  

E-Print Network [OSTI]

STAT 3843A Fall 2013 Assignment 2 Due: October 11 on paper in class 1. For any sampling scheme, i of the students to be equal to the last 5 digits of your student id number. (For example, if your id is 250766362

Murdoch, Duncan

164

Chemistry 106X -Fall 2010 General Chemistry  

E-Print Network [OSTI]

Chemistry 106X - Fall 2010 General Chemistry Instructor: Christopher Iceman Class: MWF 9 bookstore or elsewhere: · Chemistry and Chemical Reactivity 7th Ed. by Kotz, Treichel, and Townsend-0-495-38703-9 Electronic Book - ISBN 978-0-495-68043-7 · OWL pin number for Chemistry and Chemical Reactivity 7th Ed. (1

Wagner, Diane

165

ATS621, Fall 2013 Atmospheric Chemistry  

E-Print Network [OSTI]

ATS621, Fall 2013 Atmospheric Chemistry Tuesdays and Thursdays, 10 ­ 10:50, 212B ACRC) 491-8587 Teaching Assistant: Lauren Potter Atmospheric Chemistry Bldg., Room 11 Lepotter, transport, chemistry and deposition impact atmospheric chemical composition; 2) Explain the chemical

166

ATS621, Fall 2014 Atmospheric Chemistry  

E-Print Network [OSTI]

ATS621, Fall 2014 Atmospheric Chemistry Monday and Wednesday, 9 ­ 9:50, 212B ACRC Instructor: Prof) Understand quantitatively how emissions, transport, chemistry and deposition impact atmospheric chemical to Atmospheric Chemistry, D.J. Jacob Princeton University Press, 1999 PDF versions of the chapters can

Collett Jr., Jeffrey L.

167

Landscape Ecology + Planning NRE 687 Fall 2013  

E-Print Network [OSTI]

Landscape Ecology + Planning NRE 687 ­ Fall 2013 Course Syllabus NRE 687: Landscape Planning (preferable immediately before or after class times) Course Overview The Landscape Planning + Analysis Studio is a core studio in the landscape architecture curriculum. This course provides an opportunity to develop

Awtar, Shorya

168

Internship -Fall 2011 Search Solutions Digital Media  

E-Print Network [OSTI]

Internship - Fall 2011 Search Solutions Digital Media SSdigitalmedia.com About us: Search Solutions Search Solutions Digital Media 1500 N. Stephenson HWY Royal Oak, MI 48067 Amanda are a full service digital advertising agency. We build custom web packages to meet our clients' exact needs

Cinabro, David

169

CHEMICAL ENGINEERING Fall Term Spring Term  

E-Print Network [OSTI]

CHEG 332 Chemical Engineering Kinetics 3 CHEG 342 Heat and Mass Transfer 3 CHEG 341 Fluid Mechanics 3CHEMICAL ENGINEERING CURRICULUM Fall Term Spring Term EGGG 101 Introduction to Engineering (FYE) 2 CHEG 112 Introduction to Chemical Engineering 3 CHEM 111 General Chemistry 3 CHEM 112 General Chemistry

Lee, Kelvin H.

170

BEE 473. Watershed Engineering Fall Semester 2007  

E-Print Network [OSTI]

Engineering requirements for Engineering Laboratory and Design Elective Prerequisites: Fluid Mechanics (eBEE 473. Watershed Engineering Fall Semester 2007 Credit: 3 hours Catalogue description representative of real-life engineering problems and will involve as much hands-on experience as possible. Some

Walter, M.Todd

171

Purdue College of Science|Fall 2012  

E-Print Network [OSTI]

Purdue College of Science|Fall 2012 :: Geosciences in the Cinema :: Field Notes Colombia in Roberts Frederick L. Hovde Dean of Science Joseph S. Francisco Associate Dean for Research and Graduate Biological Sciences Paul B. Shepson Chemistry Sunil Prabhakar Computer Science Jon Harbor Earth, Atmospheric

Kihara, Daisuke

172

FALL PROTECTION PROGRAM OVERVIEW November 18, 2013  

E-Print Network [OSTI]

students and staff to promote a general culture of safety when working at heights. Department Safety to this overview. 2.2 Passive restraint systems may include safety nets, guardrails, etc. 2.3 Personal fall arrest Standards Institute. 3.0 Roles and Responsibilities 3.1 Environmental Health & Safety (EHS), along

Johnston, Daniel

173

Dynamics of Clouds Fall Semester 2012  

E-Print Network [OSTI]

ATS712 Dynamics of Clouds Fall Semester 2012 Meeting Times: T/Th: 9-10:15am Room: ATS 101-2pm Course Description: This class focuses on the general dynamics of cloud systems. Models of fog and other Tools / Skills Cotton, W.R., G.H. Bryan, and S.C. van den Heever, 2010: Storm and Cloud Dynamics

174

Fall 2012 President's Welcome Back Dear Colleagues,  

E-Print Network [OSTI]

Engineering, Chemistry, Metallurgical and Materials Engineering, and Physics departments. I'd like to thank of the formation of the College of Engineering and Computational Sciences, and Dean Kevin Moore has experiencedFall 2012 President's Welcome Back Dear Colleagues, The excitement of new and returning students

175

California Environmental Law & Policy Issues (Fall 2008)  

E-Print Network [OSTI]

Law 273.71 California Environmental Law & Policy Issues (Fall 2008) Units: 2 CCN (2Ls/3Ls): 49696 for Environmental Law & Policy and a Lecturer in Residence at Boalt Hall School of Law. He received his law degree of key California environmental law and policy issues. Guest speakers include a distinguished group

Kammen, Daniel M.

176

September 17, 2010 SLIPS, TRIPS, FALLS PREVENTION  

E-Print Network [OSTI]

and in an effort to reduce slips, trips and falls we offer the following "best practices" to consider: Be aware Environmental Services for immediate assistance Routinely check for loose power cords and cables; make Environmental Health and Safety 734-3673 Environmental Services 734-3425 Employee Health Services 734

Leistikow, Bruce N.

177

Biomedical Engineering Graduate Concentration Fall 2013 Biotechnology  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2013 Biotechnology BIOTECHNOLOGY (select one course): BIOMEDE 410 Design and Applications of Biomaterials (3) (I) BIOMEDE 556 Cellular and Molecular Biomechanics (3) (I) BIOMEDE 574 Cells in Their Environment (3) (II) BIOMEDE 616 Analysis of Chemical Signaling

Eustice, Ryan

178

Biomedical Engineering Graduate Concentration Fall 2014 Bioelectrical  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2014 Bioelectrical Advisor: Cynthia Chestek, Ph.D. BIOELECTRICAL: BIOMEDE 417 Electrical Biophysics (4) (II) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I) BIOMEDICAL

Eustice, Ryan

179

Biomedical Engineering Graduate Concentration Fall 2013 Biomechanics  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2013 Biomechanics BIOMECHANICS (select one course): BIOMEDE 456 Tissue Mechanics (3) (I) BIOMEDE 476 Biofluid Mechanics (4) (II) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics

Eustice, Ryan

180

Biomedical Engineering Graduate Concentration Fall 2014 Biomaterials  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2014 Biomaterials Advisor: David Kohn, Ph.D. BIOMATERIALS: BIOMEDE 410 Design and Applications of Biomaterials (3) (I) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I) BIOMEDICAL

Eustice, Ryan

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Biomedical Engineering Graduate Concentration Fall 2013 Bioelectrical  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2013 Bioelectrical BIOELECTRICAL: BIOMEDE 417 Electrical Biophysics (4) (II) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I) BIOMEDICAL RESEARCH AND DESIGN (select one

Eustice, Ryan

182

Biomedical Engineering Graduate Concentration Fall 2013 Biomaterials  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2013 Biomaterials BIOMATERIALS: BIOMEDE 410 Design and Applications of Biomaterials (3) (I) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I) BIOMEDICAL RESEARCH

Eustice, Ryan

183

Biomedical Engineering Graduate Concentration Fall 2014 Biomechanics  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2014 Biomechanics Advisor: Scott Hollister, Ph.D. BIOMECHANICS (select one course): BIOMEDE 456 Tissue Mechanics (3) (I) BIOMEDE 476 Biofluid Mechanics (4) (II) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550

Eustice, Ryan

184

Biomedical Engineering Graduate Concentration Fall 2014 Biotechnology  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2014 Biotechnology Advisor: Michael Mayer, Ph.D. BIOTECHNOLOGY (select one course): BIOMEDE 410 Design and Applications of Biomaterials (3) (I) BIOMEDE 556 Cellular and Molecular Biomechanics (3) (I) BIOMEDE 574 Cells in Their Environment (3) (II) BIOMEDE 616

Eustice, Ryan

185

ADVANCE Fall 2013 Grant Writing Boot Camp Analysis  

E-Print Network [OSTI]

ADVANCE Fall 2013 Grant Writing Boot Camp Analysis;ADVANCE Boot Camp ­ Fall 2013 2 Overview In the spring of 2013, the Research. Of the many meetings and events deemed critical, the ADVANCE Grant Writing Boot Camp

Dyer, Bill

186

National Small Business Federal Contracting Summit-DC Fall Conference...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

National Small Business Federal Contracting Summit-DC Fall Conference National Small Business Federal Contracting Summit-DC Fall Conference November 6, 2014 8:00AM to 4:00PM EST...

187

ME 119 a Prof. A. Minnich Fall 2011 Syllabus  

E-Print Network [OSTI]

ME 119 a Prof. A. Minnich Fall 2011 Syllabus ME 119a - Heat Transfer: Conduction and Radiation community and perpetuating the Honor System." #12;ME 119 a Prof. A. Minnich Fall 2011 Syllabus Schedule

188

CMPE 185 Fall 1999 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Fall 1999 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF 2 Syllabus CMPE 185 Fall 1999 4 Special guest lecturers I may arrange to have some guest lectures

Karplus, Kevin

189

CMPE 185 Fall 2000 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Fall 2000 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF 2, and need to do the grading mostly on Dec 2. Karplus Info 1 #12; 2 Syllabus CMPE 185 Fall 2000 4 Special

Karplus, Kevin

190

Global Studies Course List Fall 2010 (2111) COURSE LIST  

E-Print Network [OSTI]

...........................................................................5 2. Global Economy and Global Governance .................................................9 3 from one of six Global Concentrations (Sustainable Development; Global Economy and Global GovernanceGlobal Studies Course List ≠ Fall 2010 (2111) Page 1 COURSE LIST Fall 2010 (2111) Global Studies

Jiang, Huiqiang

2111-01-01T23:59:59.000Z

191

arts fall training: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

21 22 23 24 25 Next Page Last Page Topic Index 1 BA: Art History Fall--First Year Environmental Sciences and Ecology Websites Summary: BA: Art History Fall--First Year ART...

192

BIOSC 871-03 Fall 2004 CONSERVATION GENETICS  

E-Print Network [OSTI]

BIOSC 871-03 Fall 2004 CONSERVATION GENETICS Monday-Wednesday, 9:30 - 10:45 Instructor: Dr assignments: Frankham et al. 2002 #12;2 BIOSCI 871-03 Fall 2004 CONSERVATION GENETICS INSTRUCTOR: Dr. Margaret

Ptacek, Margaret B.

193

Green Lands Blue Water 2014 Fall Conference | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Green Lands Blue Water 2014 Fall Conference Green Lands Blue Water 2014 Fall Conference November 18, 2014 10:00AM CST to November 20, 2014 4:00PM CST Richland Community College...

194

advanced falling film: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grade Lathrop, Daniel P. 29 Advanced Virology MCBI 7460 Fall 2013 Tuesdays from 2 to 5 pm Engineering Websites Summary: Advanced Virology MCBI 7460 Fall 2013 Tuesdays from 2 to 5...

195

Research Projects in Industrial Technology.  

SciTech Connect (OSTI)

The purpose of this booklet is to briefly describe ongoing and completed projects being carried out by Bonneville Power Administration's (BPA) Industrial Technology Section. In the Pacific Northwest, the industrial sector is the largest of the four consuming sectors. It accounted for thirty-nine percent of the total firm demand in the region in 1987. It is not easy to asses the conservation potential in the industrial sector. Recognizing this, the Northwest Power Planning Council established an objective to gain information on the size, cost, and availability of the conservation resource in the industrial sector, as well as other sectors, in its 1986 Power Plan. Specifically, the Council recommended that BPA operate a research and development program in conjunction with industry to determine the potential costs and savings from efficiency improvements in industrial processes which apply to a wide array of industrial firms.'' The section, composed of multidisciplinary engineers, provides technical support to the Industrial Programs Branch by designing and carrying out research relating to energy conservation in the industrial sector. The projects contained in this booklet are arranged by sector --industrial, utility, and agricultural -- and, within each sector, chronologically from ongoing to completed, with those projects completed most recently falling first. For each project the following information is given: its objective approach, key findings, cost, and contact person. Completed projects also include the date of completion, a report title, and report number.

United States. Bonneville Power Administration. Industrial Technology Section.

1990-06-01T23:59:59.000Z

196

HKUST Programming Contest 2006 Fall Page 1 of 7  

E-Print Network [OSTI]

Programming Contest 2006 Fall Page 4 of 7 Problem C ≠ Marble Arrangement Given the number of marbles of threeHKUST Programming Contest 2006 Fall Page 1 of 7 HKUST Programming Contest 2006 Fall Sponsored Programming Contest 2006 Fall Page 2 of 7 Problem A ≠ Infinite Path (0,0) (0,1) (0,2) (0,3) (0,4) (0,5) (1

Wu, Dekai

197

Building Brighter Futures Together Summer/Fall 2013  

E-Print Network [OSTI]

CARLSBAD Summer/Fall 2013 · carlsbad.nmsu.edu 2 Table of Contents Academic Calendar/Important Dates

Nishiguchi, Michele

198

fall convocation THE UNIVERSITY OF NEW MEXICO SCHOOL OF ENGINEERING  

E-Print Network [OSTI]

fall convocation THE UNIVERSITY OF NEW MEXICO SCHOOL OF ENGINEERING fall convocation #12;Message from the Dean To the Fall 2012 University of New Mexico School of Engineering Graduates I am delighted and honored to welcome you to the University of New Mexico School of Engineering Convocation

New Mexico, University of

199

30 BOSTONIA Fall 2014 PHOTOGRAPHS BY MATTIA BALSAMINI Lessons from  

E-Print Network [OSTI]

30 BOSTONIA Fall 2014 PHOTOGRAPHS BY MATTIA BALSAMINI Lessons from #12;Fall 2014 BOSTONIA 31 Venice LASKOWSKI #12;32 BOSTONIA Fall 2014 On a warm June night, tourists sip cocktails on the banks of the Grand into the ground, effectively petrifying and preserving them. They put planks on top of these pillars, and marble

Spence, Harlan Ernest

200

Prof. A. Suciu Name: MTH 1733 QUIZ 4 Fall 1997  

E-Print Network [OSTI]

Prof. A. Suciu Name: MTH 1733 QUIZ 4 Fall 1997 1. 6 points Solve the following initial value of differential equations: x 0 = 2x + y y 0 = \\Gammax + 4y #12; MTH 1733 Quiz 4 Fall 1997 3. 6 points A tank present? #12; MTH 1733 Quiz 4 Fall 1997 5. 6 points Consider the following autonomous differential

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

202

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

203

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

204

Seismic and Acoustic Investigations of Rock Fall Initiation, Processes, and Mechanics  

E-Print Network [OSTI]

Happy †Isles †and †the †1999 †Glacier †Point †rock †falls, †there † was † an † attempt † to † monitor † rock † fall † in † Yosemite † Valley †

Zimmer, Valerie Louise

2011-01-01T23:59:59.000Z

205

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

206

Page 1 of 2 -ARC Cost Transfer Guide v. 06/14/13 ARC SPONSORED PROJECT COST TRANSFER GUIDE  

E-Print Network [OSTI]

Page 1 of 2 - ARC Cost Transfer Guide v. 06/14/13 ARC SPONSORED PROJECT COST TRANSFER GUIDE There are three ways to move expenditures onto, off of, or between Sponsored Projects in ARC: AP Journal Voucher in which the voucher accounting date falls, and they are being moved to or between Sponsored Projects GL

Hone, James

207

Retrofit Savings Determination for Wichita Falls Independent School District  

E-Print Network [OSTI]

&M University Denver Center Energy Systems Laboratory Texas Engineering Experiment Station Wichita Falls ISD Texas A&M University College station. TX Denver Center Energy Systems Laboratory Wichita Falls ISO Texas A&M University Fannin Elementary Energy Systems... SAV-Burgess 10/1/01 10:52 AM Wichita Falls ISD SAV-Carrigan 10/1/01 10:52 AM Wichita Falls ISD SAV-Denver 10/1/01 10:51 AM Wichita Falls ISD SAV-Faninn 10/1/01 10:51 AM Wichita Falls ISD SAV-Harrel KV1/01 10:51 AM Wichita Falls ISD SAV-Hayden 1O/1...

Shao, X.; Baltazar-Cervantes, J. C.; Claridge, D. E.

2001-01-01T23:59:59.000Z

208

Faculty Office Hours Fall 2014 Aberle, James  

E-Print Network [OSTI]

Faculty Office Hours Fall 2014 Aberle, James GWC 326 01:30 PM 02:45 PMM T W F to Tuesday is through:30 AMR to Coleman, James BYENG 450 08:45 AM 09:45 AMT R to By Appointment Cotter, Jeff GWC 424 03:15 PM:00 AM 09:30 AMF to Or at a time arranged via e-mail to reisslein@asu.edu Rodriguez, Armando GWC 352 10

Zhang, Yanchao

209

Journal of Undergraduate Research, Fall 2009  

E-Print Network [OSTI]

, electrospray is not a universal ionizer. Some of the ingredients may not have been ionized and therefore would not be detected by the mass spectrometer. Qualitative analysis was performed on each of the samplesí NMR spectra. The body wash samples...The Journal of Undergraduate Research at the University of Kansas Second Edition | Fall 2009 ON THE COVER Jayhawk Boulevard winds between Fraser Hall (left) and Lippincott and Dyche halls on the Lawrence campus. Courtesy University Relations...

2009-10-01T23:59:59.000Z

210

Introduction to GIS and Geospatial Analysis Project Presentation  

E-Print Network [OSTI]

GIS 551 Introduction to GIS and Geospatial Analysis Fall 2009 Project Presentation Date Presenter-03 Huiqing Li Yungfei Li Hydrological Analysis of Alto Watershed, Texas 12-03 Erica Lundberg Wes Ward T Fire Department Service Call Density and Location Analysis 12-10 Rachel Blodgett Kelly Searles SFA

Hung, I-Kuai

211

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER  

Broader source: Energy.gov [DOE]

Idaho Falls, ID Ė The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOEís Idaho site.

212

NSF ITR Project General Notes on Trypsin Test Procedure  

E-Print Network [OSTI]

NSF ITR Project Fall 2004 General Notes on Trypsin Test Procedure: Automated performance procedure the assay still work"?) Calculation of the Z' ­ Factor (quality criteria) Manual performance procedure: (Uses/purpose of procedure: Setup a new assay. Use as basis for comparison with automated version

Kaber, David B.

213

Infra-red Abelian dominance without Abelian-projection  

E-Print Network [OSTI]

Maximal Abelian gauge has been a particular choice to study dynamical generation of off-diagonal gluon masses in QCD. This gauge is a special case of Abelian projection. Massive off-diagonal gluons are considered a clue to Abelian dominance. Here we propose a gauge condition which is quadratic in fields and which does not fall in the class of Abelian projection. However it does generate off-diagonal gluon masses dynamically thus hinting at Abelian dominance in this gauge too.

Haresh Raval; Urjit A. Yajnik

2014-08-06T23:59:59.000Z

214

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.  

SciTech Connect (OSTI)

The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

Bellgraph, Brian J. [Pacific Northwest National Laboratory

2009-03-31T23:59:59.000Z

215

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

216

Falling through the black hole horizon  

E-Print Network [OSTI]

We consider the fate of a small classical object, a "stick", as it falls through the horizon of a large black hole (BH). Classically, the equivalence principle dictates that the stick is affected by small tidal forces, and Hawking's quantum-mechanical model of BH evaporation makes essentially the same prediction. If, on the other hand, the BH horizon is surrounded by a "firewall", the stick will be consumed as it falls through. We have recently extended Hawking's model by taking into account the quantum fluctuations of the geometry and the classical back-reaction of the emitted particles. Here, we calculate the strain exerted on the falling stick for our model. The strain depends on the near-horizon state of the Hawking pairs. We find that, after the Page time when the state of the pairs deviates significantly from maximal entanglement (as required by unitarity), the induced strain in our semiclassical model is still parametrically small. This is because the number of the disentangled pairs is parametrically ...

Brustein, Ram

2015-01-01T23:59:59.000Z

217

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

218

Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509  

SciTech Connect (OSTI)

Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previously employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)

Boyle, J.D. [U.S. Army Corps of Engineers - Buffalo District, Buffalo, New York 14207 (United States)] [U.S. Army Corps of Engineers - Buffalo District, Buffalo, New York 14207 (United States); Fort, E. Joseph; Lorenz, William [Cabrera Services (Cabrera) East Harford, CT 06108 (United States)] [Cabrera Services (Cabrera) East Harford, CT 06108 (United States); Mills, Andy [Shaw Environmental and Infrastructure, Inc. (Shaw) Baton Rouge, LA 70809 (United States)] [Shaw Environmental and Infrastructure, Inc. (Shaw) Baton Rouge, LA 70809 (United States)

2013-07-01T23:59:59.000Z

219

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

220

Optimized Multiplex PCR: Efficiently Closing a Whole-Genome Shotgun Sequencing Project  

E-Print Network [OSTI]

Optimized Multiplex PCR: Efficiently Closing a Whole-Genome Shotgun Sequencing Project Herve sequencing project. The method employs multiplex PCR and a novel pooling strategy to minimize the number of laboratory procedures required to se- quence the unknown DNA that falls in between con- tiguous sequences

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

222

Hawking radiation on a falling lattice  

E-Print Network [OSTI]

Scalar field theory on a lattice falling freely into a 1+1 dimensional black hole is studied using both WKB and numerical approaches. The outgoing modes are shown to arise from incoming modes by a process analogous to a Bloch oscillation, with an admixture of negative frequency modes corresponding to the Hawking radiation. Numerical calculations show that the Hawking effect is reproduced to within 0.5% on a lattice whose proper spacing where the wavepacket turns around at the horizon is $\\sim0.08$ in units where the surface gravity is 1.

Ted Jacobson; David Mattingly

2000-01-12T23:59:59.000Z

223

Bioenergy Deployment Consortium (BDC) 2014 Fall Symposium  

Broader source: Energy.gov [DOE]

The 2014 BDC Fall Symposium will be held on October 21Ė22, 2014 in Fort Myers, Florida. The event will include a tour of the Algenol facility on Wednesday morning. The symposium will have panels for progress reports from current cellulosic bio-product companies, updates on government policy from several agencies, scale-up strategies,and lessons learned. POET-DSM will provide the after dinner success story. Neil Rossmeissl, Program Manager, Algal Program, Bioenergy Technologies Office, will be delivering the keynote address on expanding the bioeconomy.

224

Twin Falls District | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark JumpDetective:ToyoTurkey: EnergyGeothermal AreaBML Twin Falls

225

Falls Dam on the Pend Oreille River.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy andExsolutionFES6FYRANDOMOverview The6 Meeting of theFall27 acres

226

Falls Dam on the Pend Oreille River.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy andExsolutionFES6FYRANDOMOverview The6 Meeting of theFall27

227

ARM - Field Campaign - Fall 1997 Aerosol IOP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered¬ČPNGExperience4AJ01)3,Cloud ODgovCampaignsFIRE-Arctic CloudgovCampaignsFall 1997

228

ARM - Field Campaign - Fall 1997 Cloud IOP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered¬ČPNGExperience4AJ01)3,Cloud ODgovCampaignsFIRE-Arctic CloudgovCampaignsFall

229

DOE - Office of Legacy Management -- Falls  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof Energy AMDCoal_Budget_Fact_Sheet.pdf More + +Texas Falls City,

230

MIT Fall Career Fair | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowell L.Fall Career Fair Sep 20 2013 10:00 AM

231

,"International Falls, MN Natural Gas Pipeline Imports From Canada...  

U.S. Energy Information Administration (EIA) Indexed Site

International Falls, MN Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of...

232

,"Niagara Falls, NY Natural Gas Pipeline Imports From Canada...  

U.S. Energy Information Administration (EIA) Indexed Site

Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Niagara Falls,...

233

Safety and Occupational Health Specialist (Fall Protection Specialist)  

Broader source: Energy.gov [DOE]

The incumbent in this position serves as a Fall Protection Specialist in the Safety Office. Safety is responsible for administering BPA's safety program and providing advice, counsel, direction,...

234

Cedar Falls Utilities- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

The Cedar Falls Utilities (CFU) Energy Efficiency Rebate Program provides rebates for energy efficient heating and cooling equipment, thermal envelope improvements and appliance recycling. The...

235

River Falls Municipal Utilities- Business Energy Efficiency Rebate Program (Wisconsin)  

Broader source: Energy.gov [DOE]

River Falls Municipal Utility (RFMU) offers a variety of rebates to business customers for implementing energy efficient equipment upgrades. Rebates are available for commercial lighting, central...

236

Math 13800 Mathematics for Elementary Education II Fall 2014 ...  

E-Print Network [OSTI]

Mathematics for Elementary Education II. Fall 2014. Coordinator: Renee Figueroa (formerly Renee Roames) MATH 808 ph: 494-1929 email: rroames@

Math Dept.

2014-08-19T23:59:59.000Z

237

Math 13700 Mathematics for Elementary Education I Fall 2014  

E-Print Network [OSTI]

Mathematics for Elementary Education I. Fall 2014. Coordinator: Renee Figueroa (formerly Renee Roames) MATH 808 ph: 494-1929 email: rroames@purdue.

User

2014-08-21T23:59:59.000Z

238

Department of Mechanical Engineering Fall 2011 Flowserve Vibration Energy Harvesting  

E-Print Network [OSTI]

PENNSTATE Department of Mechanical Engineering Fall 2011 Flowserve Vibration Energy Harvesting of these vibrations, Flowseve is looking at using vibration absorbers coupled with energy harvesting technology

Demirel, Melik C.

239

Idaho Falls Power- Commercial Energy Conservation Loan Program  

Broader source: Energy.gov [DOE]

Idaho Falls Power is offering a zero interest loan program to qualifying commercial customers to install efficient lighting and other energy conservation measures. The building must receive its...

240

Idaho Falls Power- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Idaho Falls Power offers rebates to eligible customers on energy efficient HVAC measures and weatherization upgrades. Rebates are available on heat pumps, new manufactured homes and insulation....

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Idaho Falls Power- Commercial Energy Conservation Rebate Program  

Broader source: Energy.gov [DOE]

In addition to loan programs, Idaho Falls Power offers rebates for customers meeting certain criteria. An energy audit will inspect the following measures and recommend upgrades as needed:...

242

River Falls Municipal Utilities- Energy Star Appliance Rebates  

Broader source: Energy.gov [DOE]

River Falls Municipal Utility (RFMU), in conjuction with the Wisconsin Focus on Energy program, offers a variety of rebates to residential electric customers for upgrading to energy efficient...

243

DOE - Office of Legacy Management -- Niagara Falls Storage Site...  

Office of Legacy Management (LM)

of the Niagara Falls, New York, Storage Site NY.17-1 - AEC Memorandum; Malone to Smith; Subject: Monthly Progress Report for April; April 24, 1951. Attachment: Tonawanda...

244

#tipsEnergy: Weatherizing Your Home for Fall  

Broader source: Energy.gov [DOE]

With the start of colder weather, we are sharing fall energy-saving tips that will help you save money and stay comfortable.

245

City of Klamath Falls District Heating District Heating Low Temperatur...  

Open Energy Info (EERE)

Geothermal Facility Jump to: navigation, search Name City of Klamath Falls District Heating District Heating Low Temperature Geothermal Facility Facility City of Klamath...

246

Accident Investigation of the June 1, 2013, Stairway Fall Resulting...  

Energy Savers [EERE]

Accident Investigation of the June 1, 2013, Stairway Fall Resulting in a Federal Employee Fatality at DOE Headquarters Germantown, Maryland Accident Investigation of the June 1,...

247

Accident Investigation of the September 20, 2012 Fatal Fall from...  

Broader source: Energy.gov (indexed) [DOE]

Dworshak-Taft 1 Transmission Tower, at the Bonneville Power Marketing Administration Accident Investigation of the September 20, 2012 Fatal Fall from the Dworshak-Taft 1...

248

The NRS Transect 4:1 (fall 1985)  

E-Print Network [OSTI]

Transect, Fall Publications Carpinteria Salt Marsh: Wayne R.natural history of the Carpinteria Salt Marsh, complete withencompasses the 120-acre Carpinteria Salt Marsh Reserve, a

UC Natural Reserve System

1985-01-01T23:59:59.000Z

249

George Makris FALL 2006 BME 698 -103  

E-Print Network [OSTI]

/ Assembly, Loads, constraints, materials Lab: FEA Analysis of Femoral stem assembly. 12. Design Project: FEA component. 13. Design Project: FEA Of lumbar disc Lecture: FEA / Assembly, Loads, constraints, materials Lab@njit.edu TEXT AND SOFTWARE Textbook: Pro/ENGINEER WILDFIRE 2.0 Mechanica Tutorial Reference Materials: Pro

Bieber, Michael

250

George Makris FALL 2007 BME 698 -103  

E-Print Network [OSTI]

Project 8. Survey: Lumbar disc systems relevant materials Lecture: Kinematics of the lumbar jount, typical. Design Project: FEA Of lumbar disc Lecture: FEA / Assembly, Loads, constraints, materials Lab: FEA@njit.edu Reference Materials: Journal of Bone and Joint Surgery Clinical Orthopaedics Spine Journal of Orthopaedic

Bieber, Michael

251

Type B Accident Investigation of the Subcontractor Employee Injuries from a November 15, 2000, Fall Accident at the Oak Ridge National Laboratory  

Broader source: Energy.gov [DOE]

On November 15, 2000, an accident occurred at the U. S. Department of Energy (DOE) Oak Ridge National Laboratory located in Oak Ridge, Tennessee. An employee of Decon and Recovery Services of Oak Ridge, LLC (DRS), working on an Oak Ridge Operations Office (ORO) Environmental Management decommissioning and demolition project received serious injuries from a fall (approximately 13 feet) from a fixed ladder.

252

Fall 1994 wildlife and vegetation survey, Norton Air Force Base, California  

SciTech Connect (OSTI)

The fall 1994 wildlife and vegetation surveys were completed October 3-7, 1994, at Norton Air Force Base (AFB), California. Two biologists from CDM Federal Programs, the U.S. Environmental Protection Agency (EPA) regional biologist and the Oak Ridge National Laboratory (ORNL) lead biologist conducted the surveys. A habitat assessment of three Installation Restoration Project (IRP) sites at Norton Air Force Base was also completed during the fall survey period. The IRP sites include: Landfill No. 2 (Site 2); the Industrial Wastewater Treatment Plant (IWTP) area; and Former Fire Training Area No. 1 (Site 5). The assessments were designed to qualitatively characterize the sites of concern, identify potential ecological receptors, and provide information for Remedial Design/Remedial Action activities. A Reference Area (Santa Ana River Wash) and the base urban areas were also characterized. The reference area assessment was performed to provide a baseline for comparison with the IRP site habitats. The fall 1994 survey is the second of up to four surveys that may be completed. In order to develop a complete understanding of all plant and animal species using the base, these surveys were planned to be conducted over four seasons. Species composition can vary widely during the course of a year in Southern California, and therefore, seasonal surveys will provide the most complete and reliable data to address changes in habitat structure and wildlife use of the site. Subsequent surveys will focus on seasonal wildlife observations and a spring vegetation survey.

Not Available

1994-12-15T23:59:59.000Z

253

Lessons learned on the UMTRA Project  

SciTech Connect (OSTI)

This report has been compiled as part of the Technical Assistance Contractor's (TAC's) continuing efforts to improve the quality of its product to the US Department of Energy (DOE), and to reduce the costswhile maintaining a standard of excellence on the Uranium Mill Tailings Remedial Action (UMTRA) Project. The report documents the lessons learned and the steps taken to benefit the project as a result. This study has multiple objectives, which fall under the following hierarchy: To examine and evaluate past successes and mistakes. To provide a record of lessons learned for the benefit and orientation of future staffmembers. To identify shortcomings of, and desired improvements to, current UMTRA Project practices and procedures. To establish a means for the future review and dissemination of lessons learned.

Not Available

1991-02-01T23:59:59.000Z

254

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

255

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

256

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

257

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

258

Fish Health Studies Associated with the Kingston Fly Ash Spill, Spring 2009 - Fall 2010  

SciTech Connect (OSTI)

On December 22, 2008, over 4 million cubic meters of fly ash slurry was released into the Emory River when a dike surrounding a solid waste containment area at the Tennessee Valley Authority's (TVA) Kingston Fossil Plant ruptured. One component of TVA's response to the spill is a biological monitoring program to assess short- and long-term ecological responses to the ash and associated chemicals, including studies on fish health and contaminant bioaccumulation. These studies were initiated in early Spring 2009 for the purposes of: (1) documenting the levels of fly ash-associated metals in various tissues of representative sentinel fish species in the area of the fly ash spill, (2) determining if exposure to fly ash-associated metals causes short, intermediate, or long-term health effects on these sentinel fish species, (3) assessing if there are causal relationships between exposure to metals and health effects on fish, (4) evaluating, along with information from other ecological and physicochemical studies, the nature and route of contaminant transfer though food chains into higher level consumers, (5) providing important information for the Ecological Risk Assessment (ERA) for the Kingston fly ash project, and (6) serving as an important technology information transfer or model study focused on how to best evaluate the environmental effects of fly ash (and related environmental stressors), not only at the Kingston site, but also at sites on other aquatic systems where coal-fired generating stations are located. This report presents the results of the first two years of the fish health study. To date, fish health and bioaccumulation studies have been conducted from Spring 2009 though Fall 2011 and includes 6 seasonal studies: Spring 2009, Fall 2009, Spring 2010, Fall 2010, Spring 2011, and Fall 2011. Both the Spring and Fall studies have focused on 3-4 sentinel fish species that represent different feeding habits, behaviors, and home ranges. In addition to fish health and bioaccumulation, the Spring investigations also included reproductive integrity studies on the same fish used for bioaccumulation and fish health. In this report, results of the fish health studies from Spring 2009 through Fall 2010 are presented while an associated report will present the fish reproductive studies conducted during Spring 2009 and Spring 2010. A report on fish bioaccumulation was submitted to TVA in June 2011. The fish health study conducted in conjunction with the bioaccumulation and reproductive study is critical for assessing and evaluating possible causal relationships between contaminant exposure (bioaccumulation) and the response of fish to exposure as reflected by the various measurements of fish health.

Adams, Marshall [ORNL; Fortner, Allison M [ORNL

2012-05-01T23:59:59.000Z

259

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

260

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

262

ENV 6105 Page 1 of 6 Fall 2011 Air Pollution  

E-Print Network [OSTI]

ENV 6105 Page 1 of 6 Fall 2011 Syllabus Air Pollution ENV 6105.901 (ref# 90504) Fall 2011 Course Description: A study of air pollution. Emphasis is given to principles underlying our understanding of ambient air pollution, its sources, its effects, and mechanisms for its management. Credit Hours and Work

Stuart, Amy L.

263

Arch 334 -Steel Fall 2012 Course Information Architecture 334  

E-Print Network [OSTI]

Arch 334 - Steel Fall 2012 Course Information Architecture 334 Fall 2012 Steel Design Instructor with an understanding of the behavior of steel members and the structures that comprise them. In order to accomplish, about material behavior issues specific to steel structures, about how to design structural steel

Heller, Barbara

264

Chemistry B.S. Fall--First Year  

E-Print Network [OSTI]

Chemistry B.S. Fall--First Year · CHEM 130 Chemical Principles I* · CHEM 145 Freshman Seminar · CHEM 222 Intro to Quant Analysis · CHEM 245 Sophomore Seminar · CHEM 329 Organic Chemistry I · MATH 264 Calculus III · LSP coursework Fall--Third Year · CHEM 345 Junior Seminar · CHEM 323/324 Physical Chemistry

Gering, Jon C.

265

MMWCMathers Museum of World Cultures Fall 2013 No. 2  

E-Print Network [OSTI]

MMWCMathers Museum of World Cultures Fall 2013 No. 2 Fall programs and events announced pg. 3 pg. 5 pg. 8 MMWC selected as China/US partner IQ-Wall used for research, teaching Student, Museum travel at the Mathers Museum of World Cultures. I could just dive in and start de- scribing some of my favorite programs

Indiana University

266

Page 1 of 1 GG 301 Mineralogy Fall 2009  

E-Print Network [OSTI]

Page 1 of 1 GG 301 Mineralogy Fall 2009 Course Description and Syllabus Welcome to Mineralogy on mineral composition, the fourth presents optical mineralogy, the fifth introduces us to major rock some of the analytical tools of modern mineralogy. Course Information Credits: 4 Semester: Fall 2009

Hammer, Julia Eve

267

Quiz 1 MATH 373 Fall 2014  

E-Print Network [OSTI]

Sep 11, 2014 ... At the end of 20 years, Megan and Ben have the same amount of money. ... The internal rate of return on this project is anticipated to be an†...

jeffb_000

2015-01-13T23:59:59.000Z

268

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

269

Fall 2013 1,660 1,222 29,466 32,348 Fall 2012 1,781 1,107 29,707 32,595  

E-Print Network [OSTI]

Year Potomac State WVU- Tech WVU- Main All WVU Fall 2013 1,660 1,222 29,466 32,348 Fall 2012 1,781 1,107 29,707 32,595 Fall 2011 1,800 1,316 29,617 32,733 Fall 2010 1,836 1,209 29,306 32,351 Fall 2009 1,810 1,244 28,898 31,952 Fall 2008 1,582 1,224 28,840 31,646 Fall 2007 1,608 1,450 28,113 31

Mohaghegh, Shahab

270

Why the Apple Doesnít Fall Far: Understanding Intergenerational Transmission of Human Capital  

E-Print Network [OSTI]

Kjell G. Salvanes. 2003. ďWhy the Apple Doesnít Fall Far:Why the Apple Doesn't Fall Far: UnderstandingPaper Series Why the Apple Doesnít Fall Far: Understanding

Black, Sandra; Devereux, Paul; Salvanes, Kjell

2004-01-01T23:59:59.000Z

271

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

272

BRYANT FALL 2010 ABRYANT FALL 2010 A A BRYANT UNIVERSITY R E S OURCE FOR P ROFESSIONAL SUCCESS  

E-Print Network [OSTI]

BRYANT FALL 2010 ABRYANT FALL 2010 A A BRYANT UNIVERSITY R E S OURCE FOR P ROFESSIONAL SUCCESS E X AT HOME IN THE WORLD Bryant is educating students to be intrepid explorers in a world of unlimited global's fastest-growing programs. 14 DOING BUSINESS IN THE GLOBAL ARENA Bryant alumni distinguish themselves

Blais, Brian

273

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

274

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

275

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

276

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

277

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

278

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

279

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

280

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

E-Print Network 3.0 - accidental falls Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

falls Page: << < 1 2 3 4 5 > >> 1 COMPATIBILITY OF FALL PROTECTION COMPONENTS ANSI and OSHA standards emphasize compatibility of components within a personal Summary: ....

282

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

283

Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.  

SciTech Connect (OSTI)

The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

Bradbury, Allen; Slavin, Katie

1998-10-28T23:59:59.000Z

284

Jay Apt, Paulina Jaramillo, and Stephen Rose Carnegie Mellon Electricity Industry Center (CEIC)'s RenewElec Project  

E-Print Network [OSTI]

electric generators. 9 · Solar: ­ Photovoltaic (solar panels) ­ Solar thermal (concentrated solar power at 15-20 cents per kWh. · If installed prices fall 40%, PV can match the current price of wind) supporting wind projects and the investment tax credits (ITC) supporting solar projects. Electric Generation

McGaughey, Alan

285

THE AITHON BOARD: A CASE STUDY IN COMMERCIALIZATION OF A STUDENT PROJECT Connor Citron, Brian Gomberg, and John Seng  

E-Print Network [OSTI]

designs, and relatively low cost. The Aithon board aims to continue in this trend. In terms of software not practical, the project turned toward the development of a completely new robot controller board. The initial of fabrication. In Fall 2013, another senior project student began working on the Aithon board implementation

Seng, John

286

Spawning Habitat Studies of Hanford Reach Fall Chinook Salmon (Oncorhynchus tshawytscha), Final Report.  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory conducted this study for the Bonneville Power Administration (BPA) with funding provided through the Northwest Power and Conservation Council(a) and the BPA Fish and Wildlife Program. The study was conducted in the Hanford Reach of the Columbia River. The goal of study was to determine the physical habitat factors necessary to define the redd capacity of fall Chinook salmon that spawn in large mainstem rivers like the Hanford Reach and Snake River. The study was originally commissioned in FY 1994 and then recommissioned in FY 2000 through the Fish and Wildlife Program rolling review of the Columbia River Basin projects. The work described in this report covers the period from 1994 through 2004; however, the majority of the information comes from the last four years of the study (2000 through 2004). Results from the work conducted from 1994 to 2000 were covered in an earlier report. More than any other stock of Pacific salmon, fall Chinook salmon (Oncorhynchus tshawytscha) have suffered severe impacts from the hydroelectric development in the Columbia River Basin. Fall Chinook salmon rely heavily on mainstem habitats for all phases of their life cycle, and mainstem hydroelectric dams have inundated or blocked areas that were historically used for spawning and rearing. The natural flow pattern that existed in the historic period has been altered by the dams, which in turn have affected the physical and biological template upon which fall Chinook salmon depend upon for successful reproduction. Operation of the dams to produce power to meet short-term needs in electricity (termed power peaking) produces unnatural fluctuations in flow over a 24-hour cycle. These flow fluctuations alter the physical habitat and disrupt the cues that salmon use to select spawning sites, as well as strand fish in near-shore habitat that becomes dewatered. The quality of spawning gravels has been affected by dam construction, flood protection, and agricultural and industrial development. In some cases, the riverbed is armored such that it is more difficult for spawners to move, while in other cases the intrusion of fine sediment into spawning gravels has reduced water flow to sensitive eggs and young fry. Recovery of fall Chinook salmon populations may involve habitat restoration through such actions as dam removal and reservoir drawdown. In addition, habitat protection will be accomplished through set-asides of existing high-quality habitat. A key component to evaluating these actions is quantifying the salmon spawning habitat potential of a given river reach so that realistic recovery goals for salmon abundance can be developed. Quantifying salmon spawning habitat potential requires an understanding of the spawning behavior of Chinook salmon, as well as an understanding of the physical habitat where these fish spawn. Increasingly, fish biologists are recognizing that assessing the physical habitat of riverine systems where salmon spawn goes beyond measuring microhabitat like water depth, velocity, and substrate size. Geomorphic features of the river measured over a range of spatial scales set up the physical template upon which the microhabitat develops, and successful assessments of spawning habitat potential incorporate these geomorphic features. We had three primary objectives for this study. The first objective was to determine the relationship between physical habitats at different spatial scales and fall Chinook salmon spawning locations. The second objective was to estimate the fall Chinook salmon redd capacity for the Reach. The third objective was to suggest a protocol for determining preferable spawning reaches of fall Chinook salmon. To ensure that we collected physical data within habitat that was representative of the full range of potential spawning habitat, the study area was stratified based on geomorphic features of the river using a two-dimensional river channel index that classified the river cross section into one of four shapes based on channel symmetry, depth, and width. We found t

Geist, David R.; Arntzen, Evan V.; Chien, Yi-Ju (Pacific Northwest National Laboratory)

2009-03-02T23:59:59.000Z

287

,"Niagara Falls, NY Natural Gas Pipeline Exports to Canada (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Exports to Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Niagara Falls, NY...

288

Spedding entry closed due to falling debris | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Spedding entry closed due to falling debris Facilities and Engineering Services, with concurrence from ESH&A, has closed the front (north) entrance of Spedding Hall to all but...

289

9.00W Introduction to Psychology, Fall 2002  

E-Print Network [OSTI]

This course surveys questions about human behavior and mental life ranging from how you see to why you fall in love. The great controversies: nature and nurture, free will, consciousness, human differences, self and society. ...

Wolfe, Jeremy M.

290

Math 153, Fall 2014, Quiz 14; Friday, October 23, 2014  

E-Print Network [OSTI]

Math 153, Fall 2014, Quiz 14; Friday, October 23, 2014. Abraham Wald was born into a Jewish family in 1902 in modern-day Romania. As tensions built during†...

Harrison Wong

2014-10-23T23:59:59.000Z

291

Idaho Falls Power- Energy Efficient Heat Pump Loan Program  

Broader source: Energy.gov [DOE]

Idaho Falls Power offers zero interest loans to all eligible customers for the purchase and installation of energy efficient heat pumps. The Heat Pump Program applies to heating or cooling in...

292

Physics 122 Fundamentals of Physics II Syllabus for Fall 2012  

E-Print Network [OSTI]

Physics 122 ­ Fundamentals of Physics II Syllabus for Fall 2012 Course description The second)-405-4993 Office hours : TBD Website http://elms.umd.edu The syllabus and schedule can be also found at: http

Lathrop, Daniel P.

293

Physics 171. General Relativity. Professor Michael Dine Fall, 2009. Syllabus  

E-Print Network [OSTI]

Physics 171. General Relativity. Professor Michael Dine Fall, 2009. Syllabus Contact Information the material in class and in the text. I expect to revise this syllabus continually through the course

California at Santa Cruz, University of

294

Syllabus for MA 16100 IMPACT, Fall 2014 Description: Many ...  

E-Print Network [OSTI]

Syllabus for MA 16100 IMPACT, Fall 2014. Description: Many students find that large lectures are not the best way for them to learn. IMPACT is a university-wide

2014-08-25T23:59:59.000Z

295

Jefferson Lab announces two Fall Science Series lectures; examine...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the topics of Jefferson Lab's Fall Science Series. The first presentation, "When Stars Attack" is Oct. 17 and features Dr. Brian Fields from the University of Illinois. He will...

296

TA Position Available Fall Quarter 2014 Immediate Opening  

E-Print Network [OSTI]

in the development of course and workshop content and materials ∑ Assist with the identification, invitationTA Position Available ≠ Fall Quarter 2014 Immediate Opening Career Transitions with facilitation of panel/group discussions ∑ Prepare and distribute marketing materials to departments

Bogyo, Matthew

297

4 BOSTONIA Fall 2011 COMMONWEALTH NEWS FROM BU AND BEYOND  

E-Print Network [OSTI]

for those with severe motion impairments to Corey Petitt of Boston. CYDNEYSCOTT #12;Fall 2011 BOSTONIA 5 Two the 2011 Science Day Graduate School of Arts & Sciences Dean's Award and is already free online

Spence, Harlan Ernest

298

Prof. A. Suciu Name: ____________________* MTH 1733 QUIZ 4 Fall 1997  

E-Print Network [OSTI]

QUIZ 4 Fall 1997 _________ 1. |||6_points||_Solve the following________________________________Quiz_4________________________________F* *all_1997_____ _________ 3. |||6_points||_A tank________________________________Quiz_4________________________________F* *all_1997_____ _________ 5. |||6_points

299

Idaho Falls Power- Residential Energy Efficiency Loan Program  

Broader source: Energy.gov [DOE]

Idaho Falls Power's Energy Efficiency Loan Program offers zero interest loans for qualifying customers to purchase and install efficient electric appliances. The program will loan up to 100% of the...

300

Term: Fall 2012 Spring 2013 University of Pittsburgh  

E-Print Network [OSTI]

Term: Fall 2012 ­ Spring 2013 1 University of Pittsburgh HOUSING/DINING SERVICES CONTRACT This Housing/Dining Services Contract (this "Contract") is made by and between the University of Pittsburgh

Sibille, Etienne

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Term: Fall 2011 Spring 2012 University of Pittsburgh  

E-Print Network [OSTI]

Term: Fall 2011 ­ Spring 2012 1 University of Pittsburgh HOUSING/DINING SERVICES CONTRACT This Housing/Dining Services Contract (this "Contract") is made by and between the University of Pittsburgh

Sibille, Etienne

302

River Falls Municipal Utilities- Renewable Energy Finance Program  

Broader source: Energy.gov [DOE]

River Falls Municipal Utilities (RFMU) offers loans of $2,500 - $50,000 to its residential customers for the installation of photovoltaic (PV), solar thermal, geothermal, wind electric systems. The...

303

FORESTRY, BSF IPC: 2/8/2011 EFFECTIVE: Fall 2011  

E-Print Network [OSTI]

FORESTRY, BSF IPC: 2/8/2011 EFFECTIVE: Fall 2011 SCHOOL OF FORESTRY GENERAL EDUCATION REQUIREMENTS: PROFESSIONAL CORE: GRADE SCH GRADE SCH ARTS: FORESTRY: ART 290/HPE 280/MUGN 290/SPTH 3 FOR 111 Intro to Forest

Selmic, Sandra

304

Fall 2013-Office of the Registrar Student Banner Marshals  

E-Print Network [OSTI]

Fall 2013- Office of the Registrar Student Banner Marshals Morning of Commencement- Preparation with the banner and then reseat the students. There will be a second marshal to count students to make sure all

Dyer, Bill

305

Fall 2000 Vol. 1, No. 4 22 Colorado Climate  

E-Print Network [OSTI]

Colorado Climate Fall 2000 Vol. 1, No. 4 #12;22 Colorado Climate Table of Contents Climate Memories ................................................................................. 2 A Time for Time Series ­ Trends in Observed Solar Energy in Colorado? ....................................................................................................... 6 Colorado Climate in Review

306

Fall 2001 Vol. 2, No. 4 ii Colorado Climate  

E-Print Network [OSTI]

Colorado Climate Fall 2001 Vol. 2, No. 4 #12;ii Colorado Climate Table of Contents On Being a Small . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Colorado Climate in Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 A Review of the 2001 WaterYear in Colorado

307

Math 566 Topics in Combinatorics Fall 2009 Instructor Amites Sarkar  

E-Print Network [OSTI]

Math 566 Topics in Combinatorics Fall 2009 Instructor Amites Sarkar Text Combinatorics B¬īela Bollob and Fridays, in 216 Bond Hall. My phone number is 650 7569 and my e-mail is amites.sarkar@wwu.edu #12;

Sarkar, Amites

308

Math 331 Ordinary Differential Equations Fall 2014 Instructor Amites Sarkar  

E-Print Network [OSTI]

Math 331 Ordinary Differential Equations Fall 2014 Instructor Amites Sarkar Text Differential Bond Hall. My phone number is 650 7569 and my e-mail is amites.sarkar@wwu.edu Relation to Overall

Sarkar, Amites

309

Math 564 Graph Theory Fall 2008 Instructor Amites Sarkar  

E-Print Network [OSTI]

Math 564 Graph Theory Fall 2008 Instructor Amites Sarkar Text Pearls in Graph Theory (Dover Edition and Fridays, in 216 Bond Hall. My phone number is 650 7569 and my e-mail is amites.sarkar@wwu.edu #12;

Sarkar, Amites

310

Math 564 Graph Theory Fall 2013 Instructor Amites Sarkar  

E-Print Network [OSTI]

Math 564 Graph Theory Fall 2013 Instructor Amites Sarkar Text Modern Graph Theory B¬īela Bollob, Tuesdays, Wednesdays and Fridays, in 216 Bond Hall. My phone number is 650 7569 and my e-mail is amites.sarkar

Sarkar, Amites

311

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

312

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

313

Nonlocal description of a falling body through the air  

E-Print Network [OSTI]

In this present work we consider a falling body through the air under the influence of gravity. In particular, we consider the experimental data based upon the free fall of six men in the atmosphere of the earth. In order to describe this process we employ a nonlocal dissipative force. We show that our description, by using an exponential memory kernel, can fit the experimental data as well as that of a local dissipative force.

Kwok Sau Fa

2008-10-02T23:59:59.000Z

314

CS322 Fall 1999 Module 5 (Search Issues)  

E-Print Network [OSTI]

. The aim of this assignment is to learn more about search, both advanced search techniques as well as how,semantics],[proofs]). 1 #12;CPSC 322 Fall 1999 Assignment 5 2 mod(m4,[intro],[search]). mod(m5,[search,symbols],[advanced_searchCS322 Fall 1999 Module 5 (Search Issues) Assignment 5 Due: 1:30pm, Wednesday 13 October 1999

Poole, David

315

Math 514: Applied Mathematics I Course Information and Syllabus Fall 2011  

E-Print Network [OSTI]

Math 514: Applied Mathematics I Course Information and Syllabus ­ Fall 2011 Instructor: Prof. Jon M

316

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

317

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

318

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

319

Redd Site Selection and Spawning Habitat Use by Fall Chinook Salmon, Hanford Reach, Columbia River : Final Report 1995 - 1998.  

SciTech Connect (OSTI)

This report summarizes results of research activities conducted from 1995 through 1998 on identifying the spawning habitat requirements of fall chinook salmon (Oncorhynchus tshawytscha) in the Hanford Reach of the Columbia River. The project investigated whether traditional spawning habitat models could be improved in order to make better predictions of available habitat for fall chinook salmon in the Snake River. Results suggest models could be improved if they used spawning area-specific, rather than river-specific, spawning characteristics; incorporated hyporheic discharge measurements; and gave further consideration to the geomorphic features that are present in the unconstrained segments of large alluvial rivers. Ultimately the recovery of endangered fall chinook salmon will depend on how well we are able to recreate the characteristics once common in alluvial floodplains of large rivers. The results from this research can be used to better define the relationship between these physical habitat characteristics and fall chinook salmon spawning site selection, and provide more efficient use of limited recovery resources. This report is divided into four chapters which were presented in the author's doctoral dissertation which he completed through the Department of Fisheries and Wildlife at Oregon State University. Each of the chapters has been published in peer reviewed journals or is currently under review. Chapter one is a conceptual spawning habitat model that describes how geomorphic features of river channels create hydraulic processes, including hyporheic flows, that influence where salmon spawn in unconstrained reaches of large mainstem alluvial rivers. Chapter two describes the comparison of the physical factors associated with fall chinook salmon redd clusters located at two sites within the Reach. Spatial point pattern analysis of redds showed that redd clusters averaged approximately 10 hectares in area and their locations were consistent from year to year. The tendency to spawn in clusters suggests fall chinook salmon's use of spawning habitat is highly selective. Hydraulic characteristics of the redd clusters were significantly different than the habitat surrounding them. Velocity and lateral slope of the river bottom were the most important habitat variables in predicting redd site selection. While these variables explained a large proportion of the variance in redd site selection (86 to 96%), some unmeasured factors still accounted for a small percentage of actual spawning site selection. Chapter three describes the results from an investigation into the hyporheic characteristics of the two spawning areas studied in chapter two. This investigation showed that the magnitude and chemical characteristics of hyporheic discharge were different between and within two spawning areas. Apparently, fall chinook salmon used chemical and physical cues from the discharge to locate spawning areas. Finally, chapter four describes a unique method that was developed to install piezometers into the cobble bed of the Columbia River.

Geist, David R.

1999-05-01T23:59:59.000Z

320

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D†...

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a projectís infrastructure, limited to 5% of the net general revenues during the...

322

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

323

EA-1050: Test Area North Pool Stabilization Project, Idaho Falls, Idaho  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the U.S. Department of Energy's Idaho National Engineering Laboratory's proposal to remove 344 canisters of Three Mile Island core debris and...

324

Department of Biological Engineering Fall 2012 Project Name Existing Building with Green Initiatives  

E-Print Network [OSTI]

Our team looked at these technologies and preformed analysis on the following: Cost-Benefit Energy in incorporating any type of green energy sources and do cost analyses of them. The technologies that were looked to be built new addition (40,000 sq.ft.) and equip it with green initiates. Solar Innovations was interesting

Demirel, Melik C.

325

CS55N: Ten Ideas in Computer Security Fall 2005 Course Project  

E-Print Network [OSTI]

://research.microsoft.com/users/jpincus/beyond-stack-smashing.pdf · http://www.phrack.org/phrack/56/p56-0x0e · http://www.securityfocus.com/archive/1/7480 Web Site Security. Write a report describing at least five ideas in exploiting web site weaknesses. Propose a single

Boneh, Dan

326

CISC 327 -Fall 2014 ! Course Project Assignment #1 -Front End Requirements!  

E-Print Network [OSTI]

represent those requirements as a set of requirements tests. The basic idea is to analyze the requirements, and create a test case for each piece. We will study this more in class.! !Create and organize a complete set of requirements tests for the Front End of Quinterac, to test for every required behaviour (of the Front End only

Cordy, James R.

327

EIS-0300: Minnesota Agri-Power Project: Biomass for Rural Development, Granite Falls, Minnesota  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE and the Minnesota Environmental Quality Boards' [MEQB, a Minnesota State agency] decision to support a proposal by the Minnesota Valley Alfalfa Producers (MnVAP) to construct and operate a 75Ė103 megawatt biomass fueled gasifier and electric generating facility, known as the Minnesota Agri-Power Plant (MAPP), and associated transmission lines and alfalfa processing facilities.

328

Department of Mechanical Engineering Fall 2010 Shell Eco-Marathon Car Design Project  

E-Print Network [OSTI]

gallon of gasoline. · Using renewable sources of electrical energy such as solar, wind, and water would strongly considered in the vehicle design. · Various patents on energy dense batteries at the budget of $1,010.00. · The car would be able to drive from New York City to Los Angeles using less than 1

Demirel, Melik C.

329

The Falling Price of Utility-Scale Solar Photovoltaic (PV) Projects |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless or Demand-Type Water Heaters TanklessDepartment of

330

BPA will release I-5 Corridor Reinforcement Project DEIS late fall 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents 12 BONNEVILLE POWER57 1154 12

331

Project Profile: High-Temperature Falling-Particle Receiver | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d FNEPA/309DepartmentDepartment ofCycles | DepartmentEnergy

332

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

333

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

334

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore beÖ (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

335

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

336

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

337

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

338

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

339

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

340

Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1  

SciTech Connect (OSTI)

This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas.

Not Available

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

1 Energy Markets and Policy Group Energy Analysis Department The Impact of Wind Power Projects  

E-Print Network [OSTI]

1 Energy Markets and Policy Group · Energy Analysis Department The Impact of Wind Power Projects, Wind & Hydropower Technologies Program #12;2 Energy Markets and Policy Group · Energy Analysis Concerns for Wind Energy Fall Into Three Potential Categories 1. Area Stigma: Concern that rural areas

Firestone, Jeremy

342

S:\\Registration & Records\\Term Communications\\2014 Fall\\GR Fall 2014 WEB Instructions.docx 1 of 2 JOHNS HOPKINS UNIVERSITY  

E-Print Network [OSTI]

. Sign In and enter your JHED ID and password 3. Point to Registration 4. Click on Search for Classes/Registration 5. Select the academic period Fall 2014, enter the course number, and then click Search 6S:\\Registration & Records\\Term Communications\\2014 Fall\\GR Fall 2014 WEB Instructions.docx 1 of 2

Weaver, Harold A. "Hal"

343

S:\\Registration & Records\\Term Communications\\2012 Fall\\GR Fall 2012 WEB Instructions.docx 1 of 2 JOHNS HOPKINS UNIVERSITY  

E-Print Network [OSTI]

the academic period Fall 2013, enter the course number, and then click Search 6. To choose your preferredS:\\Registration & Records\\Term Communications\\2012 Fall\\GR Fall 2012 WEB Instructions.docx 1 of 2 to complete whatever transactions you wish to process.) 1. Go to isis.jhu.edu 2. Sign In and enter your JHED

Weaver, Harold A. "Hal"

344

S:\\Registration & Records\\Term Communications\\2014 Fall\\GR FAll 2014 NEW GR WEB Instructions.docx page 1 of 2 JOHNS HOPKINS UNIVERSITY  

E-Print Network [OSTI]

to Registration 4. Click on Search for Classes/Registration 5. Select the academic period Fall 2014, enter the course number, and then click Search 6. To choose your preferred section, enter a check markS:\\Registration & Records\\Term Communications\\2014 Fall\\GR FAll 2014 NEW GR WEB Instructions

Weaver, Harold A. "Hal"

345

Ultracomputer Research Project  

SciTech Connect (OSTI)

This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

Gottlieb, A.

1992-10-01T23:59:59.000Z

346

Evaluation of Project Achievements in VOMARE -project.  

E-Print Network [OSTI]

??The purpose of the thesis is to study the achievements of VOMARE Ėproject from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisationÖ (more)

Kokkarinen, Eeva

2011-01-01T23:59:59.000Z

347

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

348

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

349

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

350

Conceptual Model of the Klamath Falls, Oregon Geothermal Area  

SciTech Connect (OSTI)

Over the last 50 years significant amounts of data have been obtained from the Klamath Falls geothermal resource. To date, the complexity of the system has stymied researchers, leading to the development of only very generalized hydrogeologic and geothermal models of the area. Recently, the large quantity of available temperature data have been re-evaluated, revealing new information on subsurface heat flow and locations of faults in the system. These inferences are supported by borehole, geochemical, geophysical, and hydrologic data. Based on re-evaluation of all available data, a detailed conceptual model for the Klamath Falls geothermal resource is proposed. 1 tab., 8 figs., 21 refs.

Prucha, R.H.; Benson, S.M.; Witherspoon, P.A.

1987-01-20T23:59:59.000Z

351

Conceptual model of the Klamath Falls, Oregon geothermal area  

SciTech Connect (OSTI)

Over the last 50 years significant amounts of data have been obtained from the Klamath Falls geothermal resource. To date, the complexity of the system has stymied researchers, leading to the development of only very generalized hydrogeologic and geothermal models of the area. Recently, the large quantity of available temperature data have been re-evaluated, revealing new information on subsurface heat flow and locations of faults in the system. These inferences are supported by borehole, geochemical, geophysical, and hydrologic data. Based on re-evaluation of all available data, a detailed conceptual model for the Klamath Falls geothermal resource is proposed.

Prucha, R.H.; Benson, S.M.; Witherspoon, P.A.

1987-01-01T23:59:59.000Z

352

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

353

Project Description: page 1 Project Description  

E-Print Network [OSTI]

Project Description: page 1 Project Description I. Introduction: Josephson junction networks Over the past 25 years, superconducting Josephson junctions have gradually become one of the major topics standards. Our research uses Josephson junctions as model systems for problems in nonlinear and neural

Segall, Ken

354

Livingston Campus Geothermal Project The Project  

E-Print Network [OSTI]

Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

Delgado, Mauricio

355

Dworshak & Brownlee Hydro Operations For Snake River Fall Chinook  

E-Print Network [OSTI]

the Final Environmental Impact Statement (FEIS) for the project. The Staff Alternative in the FEIS calls

356

38 | FALL 2012 www.feminist.org www.msmagazine.com FALL 2012 | 39  

E-Print Network [OSTI]

THE WORLD? HAT DO A CIVIL RIGHTS lawyer, project coordinator at a breast cancer nonprofit, taxicab workers' organizer, field representative for a state legisla- tor, biofuel entrepreneur, research analyst for HIV to effect real-world change. Take Rebecca Mann, who became involved with NOW while doing an undergraduate

Edwards, Paul N.

357

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

358

Contract/Project Management  

Energy Savers [EERE]

on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

359

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

360

The 4-H Project  

E-Print Network [OSTI]

As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

362

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

363

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

364

Fall 2011 BOSTONIA 23 In 2009, Image Comics  

E-Print Network [OSTI]

Fall 2011 BOSTONIA 23 In 2009, Image Comics issued a comic book with a cover depicting Barack Obama's real-life end, but the al-Qaeda leader's demise made the Obama-Osama cover a collector's item that now introduced Dust, a Muslim "mutant," or superhuman member of the famed X-Men, only her eyes visible behind her

Spence, Harlan Ernest

365

Transportation Policy Analysis and Systems Planning Fall 2009/2010  

E-Print Network [OSTI]

SYLLABUS WWS 527a Transportation Policy Analysis and Systems Planning Fall 2009/2010 Course Description Part 1. Perspective on the Transportation Sector of the Economy: Its Function, Its Players, Its of Course Elements of the transportation sector of the economy, the player, the technologies

Singh, Jaswinder Pal

366

Soil Properties, Surveys, and Applications GEOG 3220 Fall 2009  

E-Print Network [OSTI]

Soil Properties, Surveys, and Applications GEOG 3220 Fall 2009 Dr. Scott Lecce Office: A-235, Elements of the Nature and Properties of Soils Course Description: The purpose of this course is to provide a general introduction to soil science for students interested in environmental studies. It is taught from

Lecce, Scott A.

367

Course Syllabus-Undergrads SWS 4207/5208, Fall 2013  

E-Print Network [OSTI]

Management 3 Credits, MWF, Period 3 Instructor: George Hochmuth, Professor, IFAS, Soil and Water ScienceCourse Syllabus-Undergrads SWS 4207/5208, Fall 2013 Sustainable Agricultural and Urban Land contamination depends on adopting best management practices (BMPs) for land and nutrient management in the urban

Ma, Lena

368

Course Syllabus-Undergrads SWS 4207/5208, Fall 2014  

E-Print Network [OSTI]

Management 3 Credits, MWF, Period 3 Instructor: George Hochmuth, Professor, IFAS, Soil and Water Science research literature dealing with sustainability of agriculture and urban land management. Class format: AllCourse Syllabus-Undergrads SWS 4207/5208, Fall 2014 Sustainable Agricultural and Urban Land

Ma, Lena

369

Course Syllabus: Political Science 327 POLITICAL PARTIES Fall 2013  

E-Print Network [OSTI]

Course Syllabus: Political Science 327 POLITICAL PARTIES Fall 2013 "A number of citizens, whether, 1796 "If I had to go to heaven except with a political party, I would rather not go there at all." --Thomas Jefferson "Political parties created modern democracy and modern democracy is unthinkable save

Young, Paul Thomas

370

Overview of the MSW Application Process for Fall 2011 Admission  

E-Print Network [OSTI]

1 Overview of the MSW Application Process for Fall 2011 Admission # 1: Minimum Requirements in order to begin their MSW study at the Jane Addams College of Social Work. Ideally, all requirements Applicants Transferring From Other MSW Programs October 1 to January 31 International Applicants October 1

Illinois at Chicago, University of

371

Instructions for MSW Application for Fall 2011 Admission  

E-Print Network [OSTI]

1 Instructions for MSW Application for Fall 2011 Admission I. JACSW Application Application Item undergraduate courses that are the equivalent to courses taken in the foundation year of the MSW program. Please note you must have received a "B" or better in order to get credit toward the MSW. Also, be sure

Illinois at Chicago, University of

372

Charges for Technology Fall 2014 / Spring 2015 / Summer 2015  

E-Print Network [OSTI]

Charges for Technology Fall 2014 / Spring 2015 / Summer 2015 Part Full Part Full Agricultural/A N/A No Veterinary Medicine & Biomedical Sciences 7.50 90.00 N/A N/A No Charges for Technology are assessed to students based on their declared major/program to support college technology needs for students

373

Alex Linares UPP 502, Planning Skills, Fall 2012  

E-Print Network [OSTI]

and brickyards. In 1852, the opening of the Rock Island railroad also contributed to Blue Island's growth. Blue to block traffic on the Rock Island rail line. On June 30th , 1894, two workers blocked the Rock Island. Source: 2005 Land Use Inventory, Version 1.0, CMAP #12;Alex Linares UPP 502, Planning Skills, Fall 2012

Illinois at Chicago, University of

374

ECE 451 -Fall 2011 Physics of Semiconductor Devices (3)  

E-Print Network [OSTI]

ECE 451 - Fall 2011 Physics of Semiconductor Devices (3) Electronics and Optoelectronics-Photon Scattering Processes (Optional) 18. Novel Optoelectronics and Electronics Devices (Optional) Structure on Semiconductor Physics and Device Physics, Draft Version (2010). Other Additional References or Readings: 1. J

Gilchrist, James F.

375

Course Syllabus -BCT 191A -Fall, 2011 The Built Environment  

E-Print Network [OSTI]

Course Syllabus - BCT 191A - Fall, 2011 The Built Environment Instructor: David T. Damery Office, Holdsworth 110 TEXT & MATERIALS: Reshaping the Built Environment: Ecology, Ethics and Economics, edited the issues of sustainability from the perspective of the built environment, our history of construction

Schweik, Charles M.

376

ELECTRICAL ENGINEERING CURRICULUM GUIDE Fall 2012 Spring 2013  

E-Print Network [OSTI]

of Engineering ­ 2.00 GPA in all required engineering, math, chemistry and physics courses ECE Department ­ 2ELECTRICAL ENGINEERING CURRICULUM GUIDE Fall 2012 ­ Spring 2013 ACADEMIC REQUIREMENTS 1. REQUIRED TOTAL CREDITS Electrical Engineering, 125-126 A minimum of 42 upper-division semester credits (300

377

The Electrochemical Society Interface Fall 2006 MARK ORAZEM  

E-Print Network [OSTI]

The Electrochemical Society Interface · Fall 2006 MARK ORAZEM For his contributions distinguished service to the educa- tional and research dissemination missions of The Electrochemical Society. Mark Orazem obtained his BS and MS degrees from Kansas State University and his doctorate in 1983 from

Fang, Yuguang "Michael"

378

WLDF 311 Treefrog Study; Fall 2007 PVC Pipe Deployment Protocol  

E-Print Network [OSTI]

WLDF 311 Treefrog Study; Fall 2007 PVC Pipe Deployment Protocol: 1. Arrange time to meet should include: a. 12 pipes with caps (there should be ~3 pipes on "your" transects out in the field & place trap on the stake (using hole near top of pipe for screw head). e. Record UTM positions (easting

Johnson, Matthew

379

2012 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY  

E-Print Network [OSTI]

2012 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY September 24 - December 7, 2012 www.uoregon.edu/~oimb The university's marine biology station at Charleston is an ideal location for the study of marine systems. Many students majoring in marine biology, biology, general science, and environmental science. Field trips

Oregon, University of

380

2013 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY  

E-Print Network [OSTI]

2013 FALL TERM AT THE OREGON INSTITUTE OF MARINE BIOLOGY September 30 - December 13, 2013 www.uoregon.edu/~oimb The university's marine biology station at Charleston is an ideal location for the study of marine systems. Many students majoring in marine biology, biology, general science, and environmental science. Field trips

Oregon, University of

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CONDUCTION HEAT TRANSFER Dr. Ruhul Amin Fall 2011  

E-Print Network [OSTI]

ME 525 CONDUCTION HEAT TRANSFER Dr. Ruhul Amin Fall 2011 Office: 201C Roberts Hall Lecture Room of conduction heat transfer. Important results which are useful for engineering application will also: 121 Roberts Hall Phone: 994-6295 Lecture Periods: 12:45- 2:00, TR TEXT: Heat Conduction, M. N. Ozisik

Dyer, Bill

382

BEE 331. Bio-Fluid Mechanics Fall Semester 2005  

E-Print Network [OSTI]

BEE 331. Bio-Fluid Mechanics Fall Semester 2005 1. Course Outcomes: Outcome 1. Learn the principles of fluid hydrostatics and dynamics in biological systems. Assessment Metrics: Home work assignments 1, 2. Become familiar with methods of measuring fluid flow. Assessment Metrics: Homework assignments: 2

Walter, M.Todd

383

CSE647: Testing and Veri cation (Fall 2000) Scott Stoller  

E-Print Network [OSTI]

CSE647: Testing and Veri#12;cation (Fall 2000) Scott Stoller Exam For every problem, you must whether it is possible, based only on the given information about S, to conclude that the speci#12;ed set is persistent in the speci#12;ed state. Your answer must be yes or no, followed by a justi#12;cation. Use

Stoller, Scott

384

CSc 155 Advanced Computer Graphics Fall 2013 Scott Gordon  

E-Print Network [OSTI]

the camera forward a small amount (i.e. in the N direction). S ­ move the camera backward a small amount (i.e1 CSc 155 ­ Advanced Computer Graphics Fall 2013 Scott Gordon Assignment # 2 ­ 3D Model Viewing DUE left"). D ­ move the camera a small amount in the positive U direction (also called "strafe right"). E

Gordon, Scott

385

Fall Semester Technical College Course Biomedical Engineering Course Requirements  

E-Print Network [OSTI]

First Year Fall Semester Technical College Course Biomedical Engineering Course Requirements Technical College Course Biomedical Engineering Course Requirements No Equivalent BMEN 211 ENG 102 ENGL 102 Course Biomedical Engineering Course Requirements No Equivalent BMEN 202 CHM 211 CHEM 333/331L MAT 240

Almor, Amit

386

New Seminar for Fall 2001! SUSTAINABILITY AND THE BUILT  

E-Print Network [OSTI]

New Seminar for Fall 2001! SUSTAINABILITY AND THE BUILT ENVIRONMENT Description In the United and ultimately dispose of buildings. Progress toward a sustainable future cannot ignore the importance of sustainability as it relates to the built environment. "Sustainability" implies a concern for social justice

Kammen, Daniel M.

387

Civil Engineering Flowchart Colorado State University Effective Fall 2009  

E-Print Network [OSTI]

Freshman CIVE 102 MATH 160 PH 141 (MATH161) Spring CIVE 103 - 3 S Eng Graphics & Comp MATH 161 - 4 Calculus CIVE 300 CHEM 113 CIVE 367 Fall CIVE 402 - 3 F Sen Design Prin CIVE 438 - 3 F,S Pollution Control CIVE

388

Fall 2011 CSC Help Desk Information Starting August 29, 2011  

E-Print Network [OSTI]

Fall 2011 CSC Help Desk Information Starting August 29, 2011 Teaching assistants maintain a help. These assistants focus on programming and basic system issues. Each of the assistants can help with Java or C programming and may be able to help with almost anything dealing with undergraduate courses. Help

Papalaskari, Mary-Angela

389

Snake River Fall Chinook Salmon Productivity Nez Perce Tribe  

E-Print Network [OSTI]

Snake River Fall Chinook Salmon Productivity Jay Hesse Nez Perce Tribe Department of Fisheries salmon abundance and productivity have been and continue to be influenced by construction and operation related to productivity; (1) adult abundance, (2) hatchery programs, (3) management actions, and (4

390

Statistics 36-756: Advanced Statistics II Syllabus: Fall, 2006  

E-Print Network [OSTI]

Statistics 36-756: Advanced Statistics II Syllabus: Fall, 2006 Instructor: Stephen E. Fienberg 132G: · To consider major topics from statistical theory and the foundations of inference not covered in Statistics 36-756: Advanced Statistics I, such as exchangeability, the axiomatic foundation of subjective probability

Fienberg, Stephen E.

391

Effective Fall 2014 Requirements for the Urban Architecture and  

E-Print Network [OSTI]

Effective Fall 2014 8.20.14 Requirements for the Urban Architecture and Urban Design Specialization Required Core Courses: (13 credits) ________ ARCH 507 Sustainable Urbanism (3 credits) ________ ARCH 535 as part of the urban architecture specialization in Portland. In the case that one or more of these course

392

Vol. ?, No. ?, Fall ???? 1 The Crichlow Slide Rule  

E-Print Network [OSTI]

Vol. ?, No. ?, Fall ???? 1 The Crichlow Slide Rule Brian Borchers Introduction In 1936, Robert required the solution of many problems involving trigonometry. Crichlow developed a circular slide rule to the rank of Major General before his retirement in 1953. The first version of this slide rule is described

Borchers, Brian

393

CSU ATS703 Fall 2012 Numerical Weather Prediction  

E-Print Network [OSTI]

CSU ATS703 Fall 2012 Numerical Weather Prediction ATS703 is based on the course notes and papers method. A crucial element of accurate weather prediction is initialization, which is briefly discussed in Chapter 11. In the next decade, numerical weather prediction will expe- rience a revolution in model

394

COMPUTER ENGINEERING CURRICULUM GUIDE Fall 2012 Spring 2013  

E-Print Network [OSTI]

COMPUTER ENGINEERING CURRICULUM GUIDE Fall 2012 ­ Spring 2013 ACADEMIC REQUIREMENTS 1. REQUIRED TOTAL CREDITS Computer Engineering Degree, 127 A minimum of 42 upper-division semester credits (300 by the Electrical and Computer Engineering Department. 2. GRADE REQUIREMENTS University ­ 2.00 GPA College

395

History of Economic Thought Econ 426, Binghamton University, Fall 2010  

E-Print Network [OSTI]

-1- History of Economic Thought Econ 426, Binghamton University, Fall 2010 Instructor: Dr. Florenz: A History of Economic Theory and Method, 5th ed., 2007, Waveland Press ($82.95). You can use a copy of the 4 on the History of Economic Thought (e.g. History of Economic Thought by Harry Landreth and David Colander [any

Suzuki, Masatsugu

396

CSU -Fall 2013 ART 496H: ART HISTORY SEMINAR  

E-Print Network [OSTI]

of nuclear testing and radiation related disasters? Why is the Nuclear Age still hotly contested in the firstCSU - Fall 2013 ART 496H: ART HISTORY SEMINAR Representing the Nuclear Age (3 Course Description: The 2011 Fukushima Daiichi nuclear disaster in Japan has once again reignited

Stephens, Graeme L.

397

ME112 Energy Fall 2013 -UCSB Prof. E. Matthys  

E-Print Network [OSTI]

been affected by these changes. We will also look at the developing patterns in energy usage by various countries and types of societies. The US national energy flow and the related economics for both modern1 ME112 ­ Energy ­ Fall 2013 - UCSB Prof. E. Matthys Class announcement Class description

Fygenson, Deborah Kuchnir

398

ME112 Energy Fall 2011 -UCSB Prof. E. Matthys  

E-Print Network [OSTI]

by these changes. We will also look at the developing patterns in energy usage by various countries and types of societies. The US national energy flow and the related economics for both modern times and future1 ME112 ­ Energy ­ Fall 2011 - UCSB Prof. E. Matthys Class announcement Class description

Fabrikant, Sara Irina

399

Term: Fall 2013 Spring 2014 University of Pittsburgh  

E-Print Network [OSTI]

Term: Fall 2013 ­ Spring 2014 University of Pittsburgh HOUSING/DINING SERVICES CONTRACT/Dining Services Contract (this "Contract") is made by and between the University of Pittsburgh's Housing/Dining Services Contract does not guarantee admission to the University. Applicants

Sibille, Etienne

400

LSRCP Response to ISRP Snake River Fall Chinook Program Review  

E-Print Network [OSTI]

M & E needs necessary to obtain an ESA section 10 permit to operate Lyons Ferry Hatchery. LSRCP assumes that the Section 10 permit will be consistent with the Snake River Fall Chinook Recovery Plan when Plans (HGMPs) and received ESA Section 10 Permit coverage. 2. Evaluate hatchery/wild salmon interactions

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Ecology, Evolution and Behavior Seminar Series Fall Semester 2013  

E-Print Network [OSTI]

Ecology, Evolution and Behavior Seminar Series Fall Semester 2013 All seminars except dates labeled alters female behavior and physiology in feral horses Sept. 19 Noah Fierer Univ Colorado Boulder Ecology. Dept. of Biological Sci. The influence of ecological conditions on helping behavior

Beex, A. A. "Louis"

402

ECOLOGY ABIO 320 FALL 2013 DR. CARACO BIOLOGY 253  

E-Print Network [OSTI]

1 ECOLOGY ABIO 320 FALL 2013 DR. CARACO BIOLOGY 253 Course Web Page: www Scores Links to Lectures #12;2 Texts Gotelli, NJ. A Primer of Ecology. 4 th Edit., 2008 (Required ) Alstad, D. Basic Populus Models of Ecology. 2001 [Rec ] Link to Download Populus on Course Web Page

Caraco, Thomas

403

FORESTRY, BSF IPC: 6/15/2011 EFFECTIVE: Fall 2011  

E-Print Network [OSTI]

FORESTRY, BSF IPC: 6/15/2011 EFFECTIVE: Fall 2011 SCHOOL OF FORESTRY GENERAL EDUCATION REQUIREMENTS: PROFESSIONAL COURSES: GRADE SCH GRADE SCH ARTS: FORESTRY CORE: ART 290/HPE 280/MUGN 290/SPTH 290 3 FOR/WILD 111 Intro to Forestry & Wildlife Management 2 FOR 201 Microcomputer Applications 3 ENGL COMPOSITION: FOR 202

Selmic, Sandra

404

ORE 654: Applications of Ocean Acoustics Fall Semester 2014  

E-Print Network [OSTI]

of this course is to provide the ocean engineering student an understanding of how sound propagates through: Ocean engineering specialization Program Outcome 5: Use of latest tools in ocean engineering ProgramORE 654: Applications of Ocean Acoustics Syllabus Fall Semester 2014 Tuesday/Thursday 12:00-1:15 PM

Frandsen, Jannette B.

405

Intro to Information Science Technology Fall 2011, Williston Campus  

E-Print Network [OSTI]

CIS1120 Intro to Information Science Technology Fall 2011, Williston Campus Vermont Technical is in BP 424. Williston Office Hours: Tue 10:30-1:00, Thu 2:30-3:00 ! (tentative, subject to change) Other hours by appointment ! In general, I am in Randolph MW and Williston TTF. Course Overview: This course

Damon, Craig A.

406

POVERTY IN THE UNITED STATES Sociology 3505, Fall 2013  

E-Print Network [OSTI]

POVERTY IN THE UNITED STATES Sociology 3505, Fall 2013 Tuesdays and Thursdays, 9:00-10:20 AM 214 __________________________________________________________________________________ COURSE DESCRIPTION This course examines the nature and extent of poverty in the United States. Students will gain familiarity with poverty issues as we review topics such as people`s views of poverty, poverty

Stephens, Jacqueline

407

STAT 472: Actuarial Models; Fall 2006 Purdue University  

E-Print Network [OSTI]

STAT 472: Actuarial Models; Fall 2006 Purdue University General Information Instructor: Prof. This course, together with its sequel, STAT 473, provides most of the background for Course 3 (Exam M of Actuaries list of exam topics, speci...cally page 36 Option A: http://www.soa.org/ccm/cms-service/stream/asset/?asset_id

Viens, Frederi G.

408

Chemistry 100 Fall 2011 Page 1 of 5  

E-Print Network [OSTI]

Chemistry 100 ­ Fall 2011 Page 1 of 5 The World of Chemistry ­ Course Syllabus Instructor Kirkwood Hall 212 Texts: Required: Chemistry in Context (CC) Course information is online through OnCourse. Course Objective(s): The primary goal of this course is to teach you about the chemistry that surrounds

Indiana University

409

CHEMISTRY COURSE OFFERINGS, FALL, 2013 (Updated 8/1/13)  

E-Print Network [OSTI]

CHEMISTRY COURSE OFFERINGS, FALL, 2013 (Updated 8/1/13) CHEM 0001-01 & 0001-02 - CHEMICAL and chemistry of materials. Three lectures, one laboratory, one recitation. Only one of Chemistry 1, 11, or 16, and coordination chemistry, and chemistry of selected elements. Three lectures, one laboratory, one recitation

Kounaves, Samuel P.

410

LASERS & OPTICAL ENGINEERING CURRICULUM GUIDE Fall 2012 Spring 2013  

E-Print Network [OSTI]

LASERS & OPTICAL ENGINEERING CURRICULUM GUIDE Fall 2012 ­ Spring 2013 ACADEMIC REQUIREMENTS 1. REQUIRED TOTAL CREDITS Lasers & Optical Engineering concentration, 125-126 A minimum of 42 upper Laboratory (ECE461 or co-registration) 1 F ECE471 Semiconductor Devices 3 F ECE503 Ultrafast Optics (ECE341

411

Advanced Calculus I (Math 309) Fall 2005 Lecture Notes  

E-Print Network [OSTI]

); (iii) invertible if f is both one-to-one and onto, and then f-1 : Y X is called the inverse function the composite function of f and g. Proposition 1.11. A function f : X Y is invertible iff there existsAdvanced Calculus I (Math 309) Fall 2005 Lecture Notes Martin Bohner Version from December 4, 2005

Bohner, Martin

412

Department of Electrical and Computer Engineering Fall 2011 Seminar Series  

E-Print Network [OSTI]

transcription requires the understanding of cooperative regulations by TFs and miRNAs, which however haveDepartment of Electrical and Computer Engineering Fall 2011 Seminar Series Seminar Title: Uncover context-specific co-regulations by transcription factors and microRNAs using Bayesian factor model Time

Pal, Ranadip

413

University of California, Berkeley Fall 2003 Energy and Resources Group  

E-Print Network [OSTI]

and technologies over the past 40 years. A focus will be on rural and decentralized energy use, and the issuesUniversity of California, Berkeley Fall 2003 Energy and Resources Group Advanced Graduate Seminar Public Policy 290 - Energy and Development Professor Daniel M. Kammen Energy and Resources Group

Kammen, Daniel M.

414

Campus Recreational Services Fall 2014 Personal Training Internship  

E-Print Network [OSTI]

Campus Recreational Services Fall 2014 Personal Training Internship OUT 395 ­ Independent Study The Personal Training Internship is designed to prepare students for the national American Council on Exercise internship offered to ALL undergraduate and graduate students (non-required OUT credits). Topics will include

Suzuki, Masatsugu

415

amagazineforalumniandfriendsoftheinstituteoftechnology|fall/winter2009-10 engineering  

E-Print Network [OSTI]

Borders work to upgrade the sanitation system at Hope Integrated Academy in Uganda · 14 Photo By diEgo Pon will receive $8 million for wind energy research, and more · 4 Alumni Report Volunteer offerings expand centennial, IT receives gift for chair in renewable energy, and more · 26 #12;2 InventIng tomorrow fall

Minnesota, University of

416

MICROBIAL ECOLOGY BIOL 4115 FALL 2014 RESEARCH PAPER GUIDLINES  

E-Print Network [OSTI]

MICROBIAL ECOLOGY ≠ BIOL 4115 ≠ FALL 2014 RESEARCH PAPER GUIDLINES Purpose: To develop and evaluate of oil Google Scholar, Web of Science, and PubMed are all good options for searching scientific articles examples: General topic Specific topic Anaerobic ammonia oxidation Anaerobic removal of nitrogen

Christner, Brent C.

417

Geology 460:301 Fall 2007 Mineralogy Lab  

E-Print Network [OSTI]

Geology 460:301 Fall 2007 Mineralogy Lab Professor Jeremy Delaney Teaching Assistant: Alissa Henza Science by Cornelius Klein (22nd edition) Introduction to Optical Mineralogy by William Nesse Grading Policy: Lab is 33% of your Mineralogy grade. This 33% is made up of: Labs: 70% Quizzes: 5% Final Exam: 25

418

BEE 4710. Introduction to Groundwater Fall Semester 2006  

E-Print Network [OSTI]

BEE 4710. Introduction to Groundwater Fall Semester 2006 Credit: 3 hours Catalogue description: Introduction, Field trip in afternoon Principles of groundwater flow Flow to Wells Properties of aquifiers Soil occurrence Groundwater models Water Quality Groundwater quality monitoring Vadose water quality monitoring

Walter, M.Todd

419

Biomedical Engineering Graduate Concentration Fall 2013 Biomedical Imaging  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2013 Biomedical Imaging BIOMEDICAL IMAGING: BIOMEDE 516 Medical Imaging Systems (3) (I) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics and Enterprise (1) (I) BIOMEDICAL RESEARCH AND DESIGN

Eustice, Ryan

420

Biomedical Engineering Graduate Concentration Fall 2014 Medical Product Development  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2014 Medical Product Development Advisor: Jan Stegemann, Ph.D. MEDICAL PRODUCT DESIGN AND DEVELOPMENT (both courses are required): BIOMEDE 599.002 Graduate BME Innovative Design Team (3) (I) BIOMEDE 599.004 Graduate BME Innovative Design Team (4) (II

Eustice, Ryan

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Biomedical Engineering Graduate Concentration Fall 2014 Biomedical Imaging  

E-Print Network [OSTI]

Biomedical Engineering Graduate Concentration ­ Fall 2014 Biomedical Imaging Advisor: Luis Hernandez-Garcia, Ph.D. BIOMEDICAL IMAGING: BIOMEDE 516 Medical Imaging Systems (3) (I) GENERAL (both courses are required): BIOMEDE 500 Biomedical Engineering Seminar (1) (I,II) BIOMEDE 550 Ethics

Eustice, Ryan

422

Origins of the extremely warm European fall of 2006  

E-Print Network [OSTI]

Origins of the extremely warm European fall of 2006 Julien Cattiaux R. Vautard, P. Yiou LSCE ­ IPSL France European Geosciences Union General Assembly 2009 CL1 Session: Climate Extremes and Impacts. #12.Cattiauxetal.,OriginsoftheextremelywarmEuropeanfallof2006 European temperatures and atmospheric circulation #12;The best correlation is found for the V-Wind

Ribes, Aurélien

423

Page 1 of 26 INDEPENDENT PROJECT  

E-Print Network [OSTI]

Page 1 of 26 INDEPENDENT PROJECT EVALUATION PROJECT NAME: HIVE PROOF-OF- CONCEPT PROJECT PROJECT ............................................................................................................................................3 The Project..............................................................................................................................................3 Project Objectives and Achievements

Evans, Paul

424

E-Print Network 3.0 - annual fall conference Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: .m., for Fall travel of same year to Maggi Vanos, Office of the Provost, 212 Westcott Building, Campus Mail Code... between January 1 - June 30) Fall (Travel takes place...

425

Cozy Up to Colder Weather: 5 Ways to Prepare Your Home for Fall...  

Office of Environmental Management (EM)

energy bills by 120 or more 5. Light the Way The fall and winter months mean less daylight. I know we are all keen on saving energy, but we don't want any falls while you carry...

426

CE 467 / 567 HIGHWAY SAFETY AND OPERATIONS Fall 2006 Course Syllabus  

E-Print Network [OSTI]

1 CE 467 / 567 HIGHWAY SAFETY AND OPERATIONS Fall 2006 Course Syllabus Catalog This course of class) #12;2 CE 467 / 567 HIGHWAY SAFETY AND OPERATIONS Fall 2006 Course Syllabus Course Outline: What

Hickman, Mark

427

CLAS C308 Roman Law C. J. Bannon SYLLABUS Fall 2012  

E-Print Network [OSTI]

CLAS C308 Roman Law C. J. Bannon SYLLABUS Fall 2012 Professor Cynthia J. Bannon Office: Ballantine% Research Paper 20% #12;CLAS C308 Roman Law C. J. Bannon SYLLABUS Fall 2012 Course Policies and Expectations

Indiana University

428

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

429

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

430

WIPP Projects Interative Map  

Broader source: Energy.gov [DOE]

View WIPP Projects in a larger map. To report corrections, please email†WeatherizationInnovation@ee.doe.gov.

431

GHPsRUS Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

432

GHPsRUS Project  

SciTech Connect (OSTI)

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

433

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

: BEVATRON Bldg. #: 51 Affected Area: Lot I (6) Lower Lot (52) Dates: 6/2009 - 11/2011 Project: Seismic PhaseProject: BELLA Bldg. #: 71 Affected Area: Lot M-1(12) B81 (18) Dates: 10/2010 ­ 10/2011 Project II Bldg. #: 74 Affected Area: U1 (50) U3 (21) Dates: 10/2009 ­ 4/2012 Project: Old Town Demo Bldg

434

Fundamental Aeronautics Hypersonics Project  

E-Print Network [OSTI]

Fundamental Aeronautics Hypersonics Project Reference Document Principal Investigator: James and detailed content of a comprehensive Fundamental Aeronautics Hypersonics research project. It contains) Hypersonic Project is based on the fact that all access to earth or planetary orbit, and all entry into earth

435

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

436

New Project Opportunities  

E-Print Network [OSTI]

/year. Most projects will be sponsored by between four and ten companies. The cost of participation may changeNew Project Opportunities PIMS: Porphyry Indicator Minerals The characteristics and relative, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps

Michelson, David G.

437

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

438

Footsteps Toward Understanding Fall Risk and Quality of Life in People with Diabetic Peripheral Neuropathy  

E-Print Network [OSTI]

, & Studenski, 1992). The utility of these tools has led to their validation in people with a known increased risk of falls due to problems such as Parkinsonís disease(Dibble, Christensen, Ballard, & Foreman, 2008), vestibular dysfunction(Marchetti, Whitney... of the aforementioned fall risk assessment tools in people with DPN. Ideally, these types of studies would use prospective methods to determine whether or not fall risk assessment tools accurately identify people at risk of falling.(Dibble & Lange, 2006; Rubenstein...

Jernigan, Stephen

2011-04-25T23:59:59.000Z

439

Lessons learned on the UMTRA Project. Special study  

SciTech Connect (OSTI)

This report has been compiled as part of the Technical Assistance Contractor`s (TAC`s) continuing efforts to improve the quality of its product to the US Department of Energy (DOE), and to reduce the costswhile maintaining a standard of excellence on the Uranium Mill Tailings Remedial Action (UMTRA) Project. The report documents the lessons learned and the steps taken to benefit the project as a result. This study has multiple objectives, which fall under the following hierarchy: To examine and evaluate past successes and mistakes. To provide a record of lessons learned for the benefit and orientation of future staffmembers. To identify shortcomings of, and desired improvements to, current UMTRA Project practices and procedures. To establish a means for the future review and dissemination of lessons learned.

Not Available

1991-02-01T23:59:59.000Z

440

Product Guide Project Standard and Project Professional  

E-Print Network [OSTI]

................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

Narasayya, Vivek

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Overload in Project Based Organizations - Causes, Symptoms and Effects.  

E-Print Network [OSTI]

?? This study investigates the matter of project overload which project members have to face in project based organizations. The thesis is based on 13Ö (more)

Hochdorfer, Tobias

2007-01-01T23:59:59.000Z

442

EP464 Fall 2004 Prof. Michael P. Bradley Edge Effects in the Parallel Plate Capacitor  

E-Print Network [OSTI]

EP464 Fall 2004 Prof. Michael P. Bradley Edge Effects in the Parallel Plate Capacitor: The Maxwell y - + + + - #12;EP464 Fall 2004 Prof. Michael P. Bradley and also multiply from x=- to a finite x value. #12;EP464 Fall 2004 Prof. Michael P. Bradley These two equipotential

Saskatchewan, University of

443

Astronomy 111, Fall 2014 30 October 2014 (c) University of Rochester 1  

E-Print Network [OSTI]

Astronomy 111, Fall 2014 30 October 2014 (c) University of Rochester 1 30 October 2014 Astronomy 111, Fall 2014 1 Astronomy 111 Lecture #16: planetary atmospheres qVertical density and pressure scattered by its upper atmosphere and rings (Galileo/ JPL/NASA) 30 October 2014 Astronomy 111, Fall 2014 2

Mamajek, Eric E.

444

Astronomy 111, Fall 2014 11 November 2014 (c) University of Rochester 1  

E-Print Network [OSTI]

Astronomy 111, Fall 2014 11 November 2014 (c) University of Rochester 1 11 November 2014 Astronomy, Australia, Aug 2009) 11 November 2014 Astronomy 111, Fall 2014 2 Jupiter's rings Discovered in 1979 be seen above and below the main ring, about a factor of ten fainter. #12;Astronomy 111, Fall 2014 11

Mamajek, Eric E.

445

Astronomy 111, Fall 2014 13 November 2014 (c) University of Rochester 1  

E-Print Network [OSTI]

Astronomy 111, Fall 2014 13 November 2014 (c) University of Rochester 1 13 November 2014 Astronomy 111, Fall 2014 1 Astronomy 111 Lecture #20: rings and orbits qPerturbations and resonances q.7 (Tides), 13 (rings) Philae lander on Comet 67P 13 November 2014 Astronomy 111, Fall 2014 2 #12;Astronomy

Mamajek, Eric E.

446

How to Select an alfalfa Variety: Determine an appropriate fall dormancy class  

E-Print Network [OSTI]

How to Select an alfalfa Variety: Determine an appropriate fall dormancy class Alfalfa varieties differ in fall dormancy defined as growth during the fall. Nondormant alfalfa varieties are usually, cool season growth of nondormant alfalfa may be undesirable in areas subject to repeated frosts

Wong, Pak Kin

447

Renewable Energy Project Refinement Webinar  

Broader source: Energy.gov [DOE]

Attendees will become familiar with the three components of project refinement: project financing strategies, off-taker agreements, and vendor selection. Project refinement obstacles, particularly...

448

RENOTER Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RENOTER Project RENOTER Project Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE...

449

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

450

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

451

National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT  

E-Print Network [OSTI]

National Compact Stellarator Experiment Project Closeout Report i PROJECT CLOSEOUT REPORT NATIONAL of Science Princeton Plasma Physics Laboratory Oak Ridge National Laboratory #12;National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT NATIONAL COMPACT STELLARATOR EXPERIMENT (NCSX

Princeton Plasma Physics Laboratory

452

Global warming and wintering in Dippers Degree project in Biology, 15hp (15 ETCS), 2014-2015  

E-Print Network [OSTI]

Global warming and wintering in Dippers Degree project in Biology, 15hp (15 ETCS), 2014-2015 Aim: Investigate changes in wintering ecology of the dipper over a period of 35 years in the light of global warming. Dippers overwinter in streams and they arrive to their overwintering grounds in late fall

Uppsala Universitet

453

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

454

Method and apparatus for reading free falling dosimeter punchcodes  

DOE Patents [OSTI]

A punchcode reader is provided for reading data encoded in a punchcode hole array on a dosimeter. The dosimeter falls through a passage in the reader containing photosensor detectors disposed along the passage which provide output signals to a microprocessor. The signals are processed to determine the orientation of the dosimeter in the reader, the location and state of punchcode holes in a two row array thereby decoding the encoded data. Multiple rate of fall calculations are made, and if appropriate matching of the punchcode array is not obtained in three tries, an error signal is output to the operator. The punchcode reader also provides for storage of data from multiple dosimeters passed through the reader, and for the output of decoded data to an external display or a computer for further processing. 8 figs.

Langsted, J.M.

1992-12-22T23:59:59.000Z

455

Free falling and rising of spherical and angular particles  

SciTech Connect (OSTI)

Direct numerical simulations of freely falling and rising particles in an infinitely long domain, with periodic lateral boundary conditions, are performed. The focus is on characterizing the free motion of cubical and tetrahedral particles for different Reynolds numbers, as an extension to the well-studied behaviour of freely falling and rising spherical bodies. The vortical structure of the wake, dynamics of particle movement, and the interaction of the particle with its wake are studied. The results reveal mechanisms of path instabilities for angular particles, which are different from those for spherical ones. The rotation of the particle plays a more significant role in the transition to chaos for angular particles. Following a framework similar to that of Mougin and Magnaudet [ďWake-induced forces and torques on a zigzagging/spiralling bubble,Ē J. Fluid Mech. 567, 185Ė194 (2006)], the balance of forces and torques acting on particles is discussed to gain more insight into the path instabilities of angular particles.

Rahmani, M., E-mail: mona.rahmani@ifpen.fr; Wachs, A., E-mail: anthony.wachs@ifpen.fr [Fluid Mechanics Department, IFP Energies nouvelles, Etablissement de Lyon, 69360 Solaize (France)

2014-08-15T23:59:59.000Z

456

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

457

Battleground Energy Recovery Project  

SciTech Connect (OSTI)

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Ô?∑ Create a Showcase Waste Heat Recovery Demonstration Project.

Daniel Bullock

2011-12-31T23:59:59.000Z

458

Uranium Mill Tailings Remedial Action Project 1994 environmental report  

SciTech Connect (OSTI)

This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

NONE

1995-08-01T23:59:59.000Z

459

WLDF 311 Treefrog Study; Fall 2007 Pipe Checking Protocol  

E-Print Network [OSTI]

WLDF 311 Treefrog Study; Fall 2007 Pipe Checking Protocol: 1. Arrange time to meet/travel to study that each pipe is checked. If there is a frog(s), then: a. Take the trap off the stake without letting frogs). If the frogs don't come out, put some more water in the pipe, swirl and "swoosh" them out. b. Pick up each frog

Johnson, Matthew

460

Energy and Society Fall 2013 Problem Set 1  

E-Print Network [OSTI]

the temperature and pressure, if known.) (3 points) g. How many square meters of solar panels (assume that the panels are placed in the Southwest in an area with an annual average solar radiation of 6.5 kWh/m2 /day, and that the solar panels have a conversion efficiency of 15%) (3 points) h. How many gallons of water that fall

Kammen, Daniel M.

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

MATH 22AL Fall 2012 Dr. Dad-del  

E-Print Network [OSTI]

MATH 22AL Fall 2012 Dr. Dad-del Important Information about MAT22A and MAT22AL MATH 22AL is an on line computer lab for MATH 22AL. This course uses MATLAB to reinforce the concepts learned in MATH22A. All MAT 22A students are required to take 22AL, unless they have taken Eng 6 or have a good knowledge

Goldwyn, Eli

462

EA-1894: Albeni Falls Flexible Winter Lake Operations, Bonner, Idaho  

Broader source: Energy.gov [DOE]

DOEís Bonneville Power Administration and the U.S. Army Corps of Engineers, as co-lead Federal agencies, prepared this EA to evaluate the potential environmental impacts of a proposal to operate Albeni Falls dam during the winter months (approximately December 15th to March 31st) and determine whether the existing Columbia River System Operation Review EIS (DOE/EIS-0170) is adequate or a supplemental or new EIS is required.

463

Advanced Calculus I (Math 309) Fall 2002 Lecture Notes  

E-Print Network [OSTI]

is invertible iff there exists a function g : Y X with (f g)(y) = y y Y and (g f)(x) = x x X, and then gAdvanced Calculus I (Math 309) Fall 2002 Lecture Notes Martin Bohner Version from December 11, 2002. Preliminaries 1 0.1. Sets 1 0.2. Functions 1 0.3. Proofs 2 Chapter 1. The Real Number System 3 1.1. The Field

Bohner, Martin

464

Advanced Calculus I (Math 309) Fall 2003 Lecture Notes  

E-Print Network [OSTI]

function of f and g. Proposition 0.9. A function f : X Y is invertible iff there exists a function g : YAdvanced Calculus I (Math 309) Fall 2003 Lecture Notes Martin Bohner Version from December 3, 2003. Preliminaries 1 0.1. Sets 1 0.2. Functions 1 0.3. Proofs 2 Chapter 1. The Real Number System 3 1.1. The Field

Bohner, Martin

465

Better Plants Progress Update Fall 2013 | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orA BRIEFApril 2015Commerce |BetterResidentialFall 2013

466

Math 110 Fall 2007Basic Calculus I Monday November 19  

E-Print Network [OSTI]

cylinder of greatest surface area that can be inscribed in a sphere of radius R. 2 #12;Math 110 Class 30 triangle of least area that can be circumscribed about a circle of radius R. 3 #12;Math 110 Class 30 Fall is C(x) = 3000 + 20x. (a) Find the revenue function R(x). (b) Find the profit function P(x). (c

Buckmire, Ron

467

Green Mountain Falls, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio: EnergyGrasslands RenewableGreatwood,GreenFalls, Colorado: Energy

468

Rib Falls, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue Ridge AndREIIReykjanes GeothermalFalls, Wisconsin: Energy

469

City of Idaho Falls, Idaho (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (UtilityHolyrood, Kansas (Utility Company) JumpIdaho Falls, Idaho

470

Operational Waste Volume Projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

471

Operational waste volume projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

Koreski, G.M.

1996-09-20T23:59:59.000Z

472

Investor Confidence Project  

E-Print Network [OSTI]

projects (under $1MM), Lighter engineering requirements Ė V1 Released September 2013 ē Targeted Commercial Ė Single Measure or Non-Interactive Retrofits Ė Release Date Dec 2013 ē Multifamily Ė Release Q1 2014 ē Quality Assurance Protocol Ė Currently in BETA...Environmental Defense Fundís Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project...

Golden, M.

2013-01-01T23:59:59.000Z

473

Project Finance Case Studies  

Broader source: Energy.gov [DOE]

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

474

Prison Solar Project  

Broader source: Energy.gov [DOE]

Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

475

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

476

Barstow Wind Turbine Project  

Broader source: Energy.gov [DOE]

Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

477

TThe {\\sc Majorana} Project  

E-Print Network [OSTI]

The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

The MAJORANA collaboration

2009-10-23T23:59:59.000Z

478

Dispersion Modeling Project  

Broader source: Energy.gov (indexed) [DOE]

Dispersion Modeling Project Nuclear & Criticality Safety Engineering Andrew Vincent Germantown, MD DOE Workshop Savannah River Nuclear Solutions, LLC June, 2012 SRNS-...

479

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Greater Seattle and Olympia Metropolitan Areas Vehicle enrollment numbers refer to the EV Project only. Numbers do not reflect total regional or national vehicles sales or...

480

Our Project Regional, community,  

E-Print Network [OSTI]

City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

Minnesota, University of

Note: This page contains sample records for the topic "burdock project fall" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

2015 Technology Innovation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

482

The MAJORANA project  

SciTech Connect (OSTI)

The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

Elliott, Steven R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

483

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

484

NAESB BPS ATC Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By Phone * 10114 NAESB BPS ATC Project Kick Off * 107 - 10814 NAESB BPS - MISO (Carmel, IN) * 112515 - NAESB BPS Conference Call * 12215 - NAESB BPS Conference...

485

PROJECT PLANNING TEMPLATE  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on public affairs efforts, which includes public information activities, press and media services, DOE home-page content, speaking engagements, special projects, internal...

486

Gravity Train Project  

E-Print Network [OSTI]

Dec 7, 2013 ... Gravity Train Project. Same page in Romanian, Polish, and in French. Let us drill a straight tunnel from West Lafayette, IN to Paris, France:.

487

Mascoma: Frontier Biorefinery Project  

Broader source: Energy.gov [DOE]

This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

488

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

489

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project. The Master of Science in Enterprise Project Management (MS-EPM) is a 36-credit degree that goes beyond

Yang, Eui-Hyeok

490

GREEN JOBS PROJECT Daniel Kammen  

E-Print Network [OSTI]

Abstract ........................................................................................................................................6 #12;Abstract This memo presents the updated results that we got in Fall 2014: we first addressed) The previous work can be found at http://rael.berkeley.edu/greenjobs, which focused on the creation of green

Kammen, Daniel M.

491

LBNL/ Adopt Fall Protection Program 2010 Here is the Company Letter Certification Template to address if your company has  

E-Print Network [OSTI]

LBNL/ Adopt Fall Protection Program 2010 Here is the Company Letter Certification Template to address if your company has decided to work under LBNL fall protection program. See attached Chapter 30 protection matrix. All fall protection equipment will be inspected before work begins by LBNL SME of fall

Eisen, Michael

492

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

493

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

494

The Home Microbiome Project  

SciTech Connect (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-08-25T23:59:59.000Z

495

The Home Microbiome Project  

ScienceCinema (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-09-15T23:59:59.000Z

496

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

497

Hydraulic Characteristics of the Lower Snake River During Periods of Juvenile Fall Chinook Migration  

SciTech Connect (OSTI)

This report documents a four-year study to assess hydraulic conditions in the lower Snake River. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by the Pacific Northwest National Laboratory. Cold water released from the Dworshak Reservoir hypolimnion during mid- to late-summer months cools the Clearwater River far below equilibrium temperature. The volume of released cold water augments the Clearwater River, and the combined total discharge is on the order of the Snake River discharge when the two rivers meet at their confluence near the upstream edge of Lower Granite Reservoir. With typical temperature differences between the Clearwater and Snake rivers of 10įC or more during July and August, the density difference between the two rivers during summer flow augmentation periods is sufficient to stratify Lower Granite Reservoir as well as the other three reservoirs downstream. Because cooling of the river is desirable for migrating juvenile fall Chinook salmon (Oncorhynchus tshawytscha) during this same time period, the amount of mixing and cold water entrained into Lower Granite Reservoirís epilimnion at the Clearwater/Snake River confluence is of key biological importance to juvenile fall Chinook salmon. Data collected during this project indicates the three reservoirs downstream of Lower Granite also stratify as direct result of flow augmentation from Dworshak Reservoir. These four lower Snake reservoirs are also heavily influenced by wind forcing at the waterís surface, and during periods of low river discharge, often behave like a two-layer lake. During these periods of stratification, lower river discharge, and wind forcing, the water in the upper layer of the reservoir is held in place or moves slightly upstream. This upper layer is also exposed to surface heating and may warm up to temperatures close to equilibrium temperature. The depth of this upper warm layer and its direction of travel may also be of key biological importance to juvenile fall Chinook salmon. This report describes field data collection, modeling, and analysis of hydrodynamic and temperature conditions in the Lower Granite Reservoir during the summer flow augmentation periods of 2002, 2003, and 2004 plus a brief one-week period in 2005 of Lower Monumental, Little Goose, and Lower Granite Reservoirs. Circulation patterns in all four lower Snake River reservoirs were numerically simulated for periods of 2002, 2003, 2004, and 2005 using CE-QUAL-W2. Simulation results show that these models are sufficiently capable of matching diurnal and long term temperature and velocity changes in the reservoirs. In addition, the confluence zone of the Clearwater and Snake rivers was modeled using the 3-D model Flow3-D. This model was used to better understand mixing processing and entrainment. Once calibrated and validated, the reservoir models were used to investigate downstream impacts of alternative reservoir operation schemes, such as increasing or decreasing the ratio of Clearwater to Snake discharge. Simulation results were also linked with the particle tracking model FINS to better understand alterations of integrated metrics due to alternative operation schemes. These findings indicate that significant alterations in water temperature throughout the lower Snake River are possible by altering hypolimnetic discharges from Dworshak Reservoir and may have a significant impact on the behavior of migrating juvenile fall Chinook salmon during periods of flow augmentation.

Cook, Chris B.; Dibrani, Berhon; Richmond, Marshall C.; Bleich, Matthew D.; Titzler, P. Scott; Fu, Tao

2006-01-30T23:59:59.000Z

498

Measuring Project Quality Factors Critical to Project Success  

E-Print Network [OSTI]

Measuring Project Quality ­ Factors Critical to Project Success Presented by Thomas Howe P available to measure and track project cost (cheap) and schedule (fast), the measurement and monitoring of project quality (good) is at best underdeveloped. While qualitative measures of project cost and schedule

Calgary, University of

499

13.400 Introduction to Naval Architecture, Fall 2004  

E-Print Network [OSTI]

Introduction to principles of naval architecture, ship geometry, hydrostatics, calculation and drawing of curves of form, intact and damaged stability, hull structure strength calculations and ship resistance. Projects ...

Herbein, David

500

MA 59800 - Fall 2014- Syllabus Differential Topology Faculty: Ralph ...  

E-Print Network [OSTI]

written project at the end of the semester. Academic Adjustments for Students with Disabilities: Students who have been certified by the Office of the Dean of†...

Ralph Kaufmann

2014-08-22T23:59:59.000Z