Sample records for building replacement project

  1. Ni Clusterbank Replacement Project | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ni Clusterbank Replacement Project Event Sponsor: Argonne Leadership Computing Facility Seminar Start Date: Oct 20 2015 - 12:00pm BuildingRoom: Building 241Room D173...

  2. Conceptual Design Plan SM-43 Replacement Project

    SciTech Connect (OSTI)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  3. Building America Technology Solutions for New and Existing Homes: Replacing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resistance Heating with Mini-Split Heat Pumps | Department of Energy Replacing Resistance Heating with Mini-Split Heat Pumps Building America Technology Solutions for New and Existing Homes: Replacing Resistance Heating with Mini-Split Heat Pumps In this project, the Advanced Residential Integrated Solutions team investigated the suitability of mini-split heat pumps for multifamily retrofits. Replacing Resistance Heating with Mini-Split Heat Pumps (638.84 KB) More Documents &

  4. EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

  5. Molecular replacement and model-building using distant homology...

    Office of Scientific and Technical Information (OSTI)

    Molecular replacement and model-building using distant homology models as templates Citation Details In-Document Search Title: Molecular replacement and model-building using...

  6. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  7. Window Replacement, Rehabilitation, & Repair Guides- Building America Top Innovation

    Broader source: Energy.gov [DOE]

    Building America team Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  8. EIS-0350: Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    The CMRR EIS examines the potential environmental impacts associated with the Proposed Action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s).

  9. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The guides are available in the Building America Solution Center, an online resource of home construction how-to's. Search for "retrofit windows" and filter for "Guides" under ...

  10. Better Buildings Showcase Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Showcase Projects Better Buildings Showcase Projects Showcase projects are initial projects started within 9 months of becoming a Better Buildings Challenge partner. Click on a project for more information about that partner.

  11. Building Energy Modeling Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emerging Technologies » Building Energy Modeling » Building Energy Modeling Projects Building Energy Modeling Projects View the Building Technologies Office's current portfolio of Building Energy Modeling projects. Core Projects AIA 2030 Commitment Portal Energy Modeling Community Resources EnergyPlus Modelica Buildings Library OpenStudio Radiance Test Procedures For Building Energy Simulation Tools Competitively Awarded Projects BENEFIT: A New Hybrid Approach to Energy Modeling BUILD:

  12. SEP Special Projects Report: Buildings Sector

    SciTech Connect (OSTI)

    2009-01-18

    The buildings section of this Sharing Success document describes SEP special projects in the buildings sector including funding.

  13. Past Building America Projects | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    focus. Learn about current Building America teams and projects. Advanced Residential Integrated Energy Solutions Alliance for Residential Building Innovation Building America ...

  14. Waste Solidification Building Project Lessons Learned Report...

    Office of Environmental Management (EM)

    Waste Solidification Building Project Lessons Learned Report Waste Solidification Building Project Lessons Learned Report This report addresses lessons learned from the Waste ...

  15. Building America Top Innovations 2013 Profile … Window Replacement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Window Replacement, Rehabilitation, & Repair Guide TOP INNOVATOR: BSC Old single-glazed ... * Modifying the window sash - remove single- pane glass from the sash and replace ...

  16. Building America Top Innovations 2013 Profile – Window Replacement, Rehabilitation, & Repair Guide

    SciTech Connect (OSTI)

    none,

    2013-09-01

    In this Top Innovation profile, Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  17. Building Technologies Office Projects Map | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Technologies Office Projects Map Building Technologies Office Projects Map Welcome to the Building Technologies Office Projects Map. Here you will find listings for our ...

  18. The multifamily building evaluation project

    SciTech Connect (OSTI)

    1995-03-01

    In 1991 the New York State Energy Office embarked on a comprehensive multi-year study of multifamily housing in New York City. The principal objective of the evaluation was to determine the degree to which new windows and boiler/burner retrofits installed in 22 multifamily buildings located in the New York City region save energy and whether the savings persist over a minimum of two years. Window and boiler retrofits were selected because they are popular measures and are frequently implemented with assistance from government and utility energy programs. Approaches prospectively, energy consumption monitoring and a series of on-site inspections helped explain why energy savings exceeded or fell short of expectations. In 1993, the scope of the evaluation expanded to include the monitoring of domestic hot water (DHW) consumption in order to better understand the sizing of combined heating/DHW boilers and water consumption patterns. The evaluation was one of ten proposals selected from over 100 candidates in a nationwide competition for a US Department of Energy Building Efficiency Program Grant. The Energy Office managed the project, analyzed the data and prepared the reports, Lawrence Berkeley Laboratory served as technical advisor, and EME Group (New York City) installed meters and dataloggers, collected data, and inspected the retrofits. The New York State Energy Research and Development Authority collaborated with the Energy Office on the DHW monitoring component. Results did not always follow predictable patterns. Some buildings far exceeded energy saving estimates while others experienced an increase in consumption. Persistence patterns were mixed. Some buildings showed a steady decline in energy savings while others demonstrated a continual improvement. A clear advantage of the research design was a frequent ability to explain results.

  19. Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  20. Project materials [Commercial High Performance Buildings Project

    SciTech Connect (OSTI)

    2001-01-01

    The Consortium for High Performance Buildings (ChiPB) is an outgrowth of DOE'S Commercial Whole Buildings Roadmapping initiatives. It is a team-driven public/private partnership that seeks to enable and demonstrate the benefit of buildings that are designed, built and operated to be energy efficient, environmentally sustainable, superior quality, and cost effective.

  1. Waste Solidification Building Project Lessons Learned Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report addresses lessons learned from the Waste Solidification Building project at the Savannah River Site relative to design, procurement, construction, startup, and commissioning.  The...

  2. Building America FY14 Projects by Building Type | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects by Building Type Building America FY14 Projects by Building Type This table lists U.S. Department of Energy Building America FY14 research projects by building type. building_america_fy14projects_bldgtype.pdf (236.49 KB) More Documents & Publications Building America FY14 Research Projects by Research Team

  3. Building America Case Study: Boiler Control Replacement for Hydronical...

    Energy Savers [EERE]

    ... Similar case studies of the effectiveness of these control features in steam- heated buildings would be valuable. Description A state-of-the-art boiler control system includes a ...

  4. NEEP Building Energy Codes Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * Markets value and prioritize energy efficiency - Rating and Disclosure ( VT, Cambridge, MA) * Robust & qualified building energy code work force: DE, RI, MA, MD, NY * ...

  5. Better Buildings Neighborhood Program Data Upgrade Projects ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are available. Reported data for some elements have been transformed, ...

  6. Building America Special Research Project: High-R Walls Case...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Special Research Project: High-R Walls Case Study Analysis Building America Special Research Project: High-R Walls Case Study Analysis This report considers a ...

  7. Project Impact Assessments: Building America FY14 Field Test...

    Energy Savers [EERE]

    Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Project Impact Assessments: Building America FY14 Field Test Technical Support ...

  8. Yurok Tribe - Tribal Utility Project and Human Capacity Building

    Broader source: Energy.gov (indexed) [DOE]

    Study (completed June 30, 2007) 2. Human Capacity Building in Energy Efficiency and ... Facility (QF) Possible Grant Funding Human Capacity Building Project Project Team ...

  9. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    SciTech Connect (OSTI)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

  10. Better Buildings Neighborhood Program Data Upgrade Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are available. Reported data for some elements have been transformed, and to protect privacy, data for some upgraded homes have been omitted.

  11. ESH&Q Building Project Update | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESH&Q Building Project Update The ESH&Q building project has been awarded, and construction mobilization is planned for the week of Nov. 30. The project is anticipated to complete...

  12. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  13. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos

  14. Southeast Energy Efficiency Alliance's Building Energy Codes Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Southeast Energy Efficiency Alliance's Building Energy Codes Project Southeast Energy Efficiency Alliance's Building Energy Codes Project Building Codes Project for the 2013 Building Technologies Office's Program Peer Review bldgcodes04_zweig_040213.pdf (708.72 KB) More Documents & Publications State and Local Code Implementation: Southeast Region - 2014 BTO Peer Review Stretch/Reach Codes Energy Code Compliance and Enforcement Best Practices

  15. Technology Solutions Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts

    SciTech Connect (OSTI)

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency, which faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68°F) than day (73° F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  16. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  17. Energy Department Launches Better Buildings Workforce Guidelines Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department today announced the Better Buildings Workforce Guidelines project to improve the quality and consistency of commercial building workforce training and certification programs for five key energy-related jobs.

  18. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.

    2012-04-01

    The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15 to 25 percent.

  19. Colorado Better Buildings Project Final Report

    SciTech Connect (OSTI)

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  20. Project Impact Assessments: Building America FY14 Field Test Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Support - 2014 BTO Peer Review | Department of Energy Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Project Impact Assessments: Building America FY14 Field Test Technical Support - 2014 BTO Peer Review Presenter: Lieko Earle, National Renewable Energy Laboratory The goal of this project is for the National Renewable Energy Laboratory to provide extensive, hands-on technical support to Building America teams in the areas of experiment

  1. Buildings of the Future Research Project Launch and Virtual Panel Discussion on Building Technology Trends

    Broader source: Energy.gov [DOE]

    Learn more about the DOE's Buildings of the Future Project. Buildings will no longer be passive objects that consume resources, but rather active participants engaged in the energy system and our community.

  2. PROJECT PROFILE: Dynamic Building Load Control to Facilitate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Penetration of Solar Photovoltaic Generation (SuNLaMP) PROJECT PROFILE: Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (SuNLaMP) ...

  3. Building America Case Study: Project Overcoat: Airtightness Strategies...

    Office of Scientific and Technical Information (OSTI)

    : Building America Case Study: Project Overcoat: Airtightness Strategies and Impacts for 1-12 Story Homes, Minneapolis, Minnesota (Fact Sheet) Citation Details In-Document Search ...

  4. The BEAM Project: Building Efficient Architectural Models

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    This activity allows students the opportunity to explore materials used in architectural engineering and gain an understanding of their insolating properties. Students will research, design, build, test and improve a structure as to achieve the highest energy efficiency possible. Structures will be tested outside on a sunny day for eight hours with temperature changes being recorded each hour. Students will gain an understanding of how the combination of building location and orientation along with building design and materials can greatly affect the energy efficiency of a building.

  5. Building Envelope Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lead Performer: Fraunhofer Center for Sustainable Energy Systems - Boston, MA Partners: University of Tennessee - Knoxville, TN, Atlas Roofing Corporation - Meridian, MS Building ...

  6. Building America Technology Solutions for New and Existing Homes: Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Overcoat: Airtightness Strategies and Impacts for 1 1/2-Story Homes, Minneapolis, Minnesota | Department of Energy Project Overcoat: Airtightness Strategies and Impacts for 1 1/2-Story Homes, Minneapolis, Minnesota Building America Technology Solutions for New and Existing Homes: Project Overcoat: Airtightness Strategies and Impacts for 1 1/2-Story Homes, Minneapolis, Minnesota In this project, the NorthernSTAR Building America Partnership team studied the effectiveness of the External

  7. Automated Auditing Tool for Retrofit Building Projects

    Energy Science and Technology Software Center (OSTI)

    2011-06-23

    Building energy auditors regularly use notepads, physical forms, or simple spreadsheets to inventory energy consuming devices in buildings and audit overall performance. Mobile computing devices such as smart phones or tablet computers with camera inputs may be used to automatically capture relevant information and format audit input in a way that streamlines work flows and reduces the likelihood of error. As an example. an auditor could walk through a space holding a mobile device, whichmore » automatically identifies and appliances, windows, etc. This information would automatically be added to a mobile database associated with the building for later integration with a larger building audit database. The user experience would require little or no manual input, and could integrate with tools to automate used to automate data collection for building energy modeling.« less

  8. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  9. Building America FY14 Research Projects by Research Team | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Research Projects by Research Team Building America FY14 Research Projects by Research Team This table shows the U.S. Department of Energy Building America FY14 research projects by team. building_america_fy14projects_team.pdf (237.42 KB) More Documents & Publications Building America FY14 Projects by Building Type

  10. Results from RFETS Building 771 Project

    Broader source: Energy.gov [DOE]

    The Requirements Based Surveillance and Maintenance (RBSM) Review Process was first performed on a pilot basis at Building 771 at the Rocky Flats Environmental Technology Site (RFETS). The purpose...

  11. Commercial Building Energy Efficiency Education Project

    SciTech Connect (OSTI)

    2013-01-13

    The primary objective of this grant is to educate the public about carbon emissions and the energy-saving and job-related benefits of commercial building energy efficiency. investments in Illinois.

  12. Capacity Building Project with Howard University

    Broader source: Energy.gov [DOE]

    The purpose of this initiative is to build community capacity for public participation in environmental and energy decision making. The target communities are those impacted by U.S. Department of...

  13. DOE Announces Webinars on Tribal Energy Project Financing, Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Re-tuning for Energy Efficiency, and More | Department of Energy Tribal Energy Project Financing, Building Re-tuning for Energy Efficiency, and More DOE Announces Webinars on Tribal Energy Project Financing, Building Re-tuning for Energy Efficiency, and More August 20, 2014 - 4:27pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the clean energy workforce. Webinars are free;

  14. PROJECT PROFILE: Dynamic Building Load Control to Facilitate High

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Penetration of Solar Photovoltaic Generation (SuNLaMP) | Department of Energy Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (SuNLaMP) PROJECT PROFILE: Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (SuNLaMP) Funding Program: SuNLaMP SunShot Subprogram: Systems Integration Location: Oak Ridge National Laboratory, Oak Ridge, TN SunShot Award Amount: $3,000,000 This project aims to develop,

  15. Project Closeout: Guidance for Final Evaluation of Building America Communities

    SciTech Connect (OSTI)

    Norton, P.; Burch, J.; Hendron, B.

    2008-03-01

    This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

  16. Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

    SciTech Connect (OSTI)

    Richman, Eric E.

    2012-10-31

    This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

  17. Leveraging SBA Loan Progams to Finance Building Energy Efficiency Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Leveraging SBA Loan Programs to Finance Building Energy Efficiency Projects Rois Langner Electricity, Resources, and Building Systems IntegraIon C enter NaIonal Renewable Energy Laboratory NREL is a naMonal laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Laboratory Snapshot Only NaIonal Laboratory Dedicated Solely to Energy Efficiency and Renewable Energy * Leading clean---energy innovaMon for

  18. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  19. Commercial Buildings Partnerships - Overview of Higher Education Projects

    SciTech Connect (OSTI)

    Parrish, Kristen; Robinson, Alastair; Regnier, Cindy

    2013-02-01

    The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits are designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.

  20. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2013-10-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. of Cambridge, Massachusetts, to implement and study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating control systems in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded.

  1. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  2. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  3. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  4. Port Graham Community Building Biomass Heating Design Project

    SciTech Connect (OSTI)

    Norman, Patrick; Sink, Charles

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  5. Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

    SciTech Connect (OSTI)

    KLEM, M.J.

    2000-10-18

    In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the

  6. Final load of debris shipped from K-25 Building demolition project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    load of debris shipped from K-25 Building demolition project Final load of debris shipped from K-25 Building demolition project March 11, 2014 - 3:00pm Addthis The last shipment of ...

  7. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect (OSTI)

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully

  8. Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls (Text Version)

    Broader source: Energy.gov [DOE]

    Transcript of the webinar, "Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls."

  9. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  10. Building America Case Study: Project Overcoat: Airtightness Strategies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partners: Cocoon, cocoon-solutions.com NorthernSTAR Building America Partnership, environment.umn.edu formsprojectview.php?id273 Building Components: Building envelope, roof...

  11. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  12. Building America Special Research Project: High-R Walls Case...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 Building Science Press All rights of ... insulation levels in many new and existing buildings. ... The author and publisher make no warranty of any kind, ...

  13. Project Impact Assessments … Building America FY14 Field Test...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Assessments - Building America FY14 Field Test Technical Support 2014 Building ... 9302014 Key Milestones : 1. Launch Field Test Best Practices web- based facilitated ...

  14. 327 Building liquid waste handling options modification project plan

    SciTech Connect (OSTI)

    Ham, J.E.

    1998-03-28

    This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study is to reevaluate the existing preferred alternative and select a new preferred alternative, if appropriate. Based on the new or confirmed preferred alternative, this study will also provide a conceptual design and cost estimate for required modifications to the 327 Facility to allow removal of RLWS and treatment of the RLW generated during deactivation.

  15. Energy Department Invests Nearly $2 Million in Small Business-Led Building Technology Projects

    Broader source: Energy.gov [DOE]

    The Department of Energy recently announced nearly $2 million for 13 new building technology projects led by small businesses with a strong potential for commercialization and job creation.

  16. Building to Grid (B2G) (Smart Grid Project) | Open Energy Information

    Open Energy Info (EERE)

    to expose their currently unused flexibility of operations, supported by building automation and information technology. References "EU Smart Grid Projects Map" Retrieved...

  17. Understanding Building Infrastructure and Building Operation through DOE Asset Score Model: Lessons Learned from a Pilot Project

    SciTech Connect (OSTI)

    Wang, Na; Goel, Supriya; Gorrissen, Willy J.; Makhmalbaf, Atefe

    2013-06-24

    The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system to help building owners to evaluate the as-built physical characteristics (including building envelope, the mechanical and electrical systems) and overall building energy efficiency, independent of occupancy and operational choices. The energy asset score breaks down building energy use information by simulating building performance under typical operating and occupancy conditions for a given use type. A web-based modeling tool, the energy asset score tool facilitates the implementation of the asset score system. The tool consists of a simplified user interface built on a centralized simulation engine (EnergyPlus). It is intended to reduce both the implementation cost for the users and increase modeling standardization compared with an approach that requires users to build their own energy models. A pilot project with forty-two buildings (consisting mostly offices and schools) was conducted in 2012. This paper reports the findings. Participants were asked to collect a minimum set of building data and enter it into the asset score tool. Participants also provided their utility bills, existing ENERGY STAR scores, and previous energy audit/modeling results if available. The results from the asset score tool were compared with the building energy use data provided by the pilot participants. Three comparisons were performed. First, the actual building energy use, either from the utility bills or via ENERGY STAR Portfolio Manager, was compared with the modeled energy use. It was intended to examine how well the energy asset score represents a buildings system efficiencies, and how well it is correlated to a buildings actual energy consumption. Second, calibrated building energy models (where they exist) were used to examine any discrepancies between the asset score model and the pilot participant buildings [known] energy use pattern. This comparison examined the end use

  18. MUNI Ways and Structures Building Integrated Solar Membrane Project

    SciTech Connect (OSTI)

    Smith, Randall

    2014-07-03

    The initial goal of the MUNI Ways and Structures Building Integrated Solar Membrane Installation Project was for the City and County of San Francisco (CCSF) to gain experience using the integrated higher efficiency solar photovoltaic (PV) single-ply membrane product, as it differs from the conventional, low efficiency, thin-film PV products, to determine the feasibility of success of larger deployment. As several of CCSF’s municipal rooftops are constrained with respect to weight restrictions, staff of the Energy Generation Group of the San Francisco Public Utilities Commission (SFPUC) proposed to install a solar PV system using single-ply membrane The installation of the 100 kW (DC-STC) lightweight photo voltaic (PV) system at the MUNI Ways and Structures Center (700 Pennsylvania Ave., San Francisco) is a continuation of the commitment of the City and County of San Francisco (CCSF) to increase the pace of municipal solar development, and serve its municipal facilities with clean renewable energy. The fourteen (14) solar photovoltaic systems that have already been installed at CCSF municipal facilities are assisting in the reduction of fossil-fuel use, and reduction of greenhouse gases from fossil combustion. The MUNI Ways & Structures Center roof has a relatively low weight-bearing capacity (3.25 pounds per square foot) and use of traditional crystalline panels was therefore rejected. Consequently it was decided to use the best available highest efficiency Building-Integrated PV (BIPV) technology, with consideration for reliability and experience of the manufacturer which can meet the low weight-bearing capacity criteria. The original goal of the project was to provide an opportunity to monitor the results of the BIPV technology and compare these results to other City and County of San Francisco installed PV systems. The MUNI Ways and Structures Center was acquired from the Cookson Doors Company, which had run the Center for many decades. The building was

  19. High Performance Building Facade Solutions PIER Final Project Report

    SciTech Connect (OSTI)

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and

  20. Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide Ross Bartlett Oak Ridge National Laboratory CASL-U-2014-0075-000-a CASL-U-2014-0075-000-a Generic TriBITS PRoject, Build, Test, and Install Quick Reference Guide Author: Roscoe A. Bartlett Contact: bartlett.roscoe@gmail.com Abstract This document is generated from the generic template body docu- ment TribitsBuildQickRefBody.rst and provides a general project- independent quick reference on how to configure, build, test, and

  1. Building America Special Research Project: High-R Walls Case Study Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Building America Special Research Project: High-R Walls Case Study Analysis Building America Special Research Project: High-R Walls Case Study Analysis This report considers a number of promising wall systems with improved thermal control to improve plant-wide performance. Unlike previous studies, it considers performance in a more realistic matter, including some true three-dimensional heat flow and the relative risk of moisture damage. Building America Special

  2. Local Option- Building Permit Fee Waivers for Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Public Act 15-194 effective October 1st 2015, requires each municipality to incorporate residential solar photovoltaic systems on its building permit application process. The municipalities are...

  3. Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Historically, only Industrial Facilities (ISO 50003 Industry - light to medium and ... is allowing Commercial Buildings (ISO 50003 - Buildings and Building Complexes) ...

  4. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect (OSTI)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  5. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  6. Generic TriBITS Project, Build, Test, and Install Reference Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generic TriBITS Project, Build, Test, and Install Reference Guide Author: Roscoe A. Bartlett Contact: bartlett.roscoe@gmail.com Date: 2015-08-27 Version: tribitsstart-1317-g4908e4...

  7. Fire hazards analysis for the replacement cross-site transfer system, project W-058

    SciTech Connect (OSTI)

    Sepahpur, J.B.

    1996-02-14

    The fire hazards analysis assess the risk from fire and determines compliance with the applicable criteria of DOE 5480.7A, DOE 6430.1A, and RLID 5480.7. (Project W-058 will provide encased pipelines to connect the SY Tank Farms in 200 West Area with the tank farms in 200 East Area via an interface with the 244-A lift station. Function of the cross-site transfer system will be to transfer radioactive waste from the SY Tank Farm to treatment, storage, and disposal facilities in 200 East Area.)

  8. Municipal-building conservation project: financing conservation in municipal buildings. Final report

    SciTech Connect (OSTI)

    Gatton, David; Mounts, Richard; Scrimger, Kay; Wood, Elizabeth; Musselwhite, Ron; Wanning, Helen; Frazier, Andrew; Pyles, Odessa

    1982-01-01

    The purpose of this survey was to assess one dimension of the energy problem that confronts cities - energy costs for public buildings - and to see how a sample of local governments had confronted that problem. While cities of all sizes tend to have a considerable variety of buildings, most are related to the basic municipal service of administration, police and fire protection, public works, and recreation. Most of these buildings consume natural gas and electricity as their primary source of energy, sources whose price is likely to rise more rapidly than the rate of inflation in the next few years. While it is difficult to assess the reports of energy costs without comparing them to the total city budget, these costs were found to be sizable among small and medium cities, and quite large among larger cities. While several of the conservation programs in the sample dated back to 1976, almost half (14) were relatively new, having been undertaken only in the last three years. Administratively, most have been placed under the direction of budget or public works officials, and, substantively, have emphasized no-cost/low-cost measures, such as employee awareness programs and improvements in building maintenance. In keeping with this, most of the programs have been supported by reprogramming funds, supplemented with local capital improvement funds, and state and federal grants. Case studies for five localities are appended.

  9. What Will the Neighbors Think? Building Large-Scale Science Projects Around the World

    ScienceCinema (OSTI)

    Jones, Craig; Mrotzek, Christian; Toge, Nobu; Sarno, Doug

    2010-01-08

    Public participation is an essential ingredient for turning the International Linear Collider into a reality. Wherever the proposed particle accelerator is sited in the world, its neighbors -- in any country -- will have something to say about hosting a 35-kilometer-long collider in their backyards. When it comes to building large-scale physics projects, almost every laboratory has a story to tell. Three case studies from Japan, Germany and the US will be presented to examine how community relations are handled in different parts of the world. How do particle physics laboratories interact with their local communities? How do neighbors react to building large-scale projects in each region? How can the lessons learned from past experiences help in building the next big project? These and other questions will be discussed to engage the audience in an active dialogue about how a large-scale project like the ILC can be a good neighbor.

  10. ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits

    SciTech Connect (OSTI)

    Loewen, J.M.; Levine, M.D.; Busch, J.F.

    1992-06-01

    The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

  11. Analysis of Installed Measures and Energy Savings for Single-Family Residential Better Buildings Projects

    SciTech Connect (OSTI)

    Heaney, M.; Polly, B.

    2015-04-30

    This report presents an analysis of data for residential single-family projects reported by 37 organizations that were awarded federal financial assistance (cooperative agreements or grants) by the U.S. Department of Energy’s Better Buildings Neighborhood Program.1 The report characterizes the energy-efficiency measures installed for single-family residential projects and analyzes energy savings and savings prediction accuracy for measures installed in a subset of those projects.

  12. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project teams work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories

  13. Seismic Safety Margins Research Program (Phase I). Project IV. Structural building response; Structural Building Response Review

    SciTech Connect (OSTI)

    Healey, J.J.; Wu, S.T.; Murga, M.

    1980-02-01

    As part of the Phase I effort of the Seismic Safety Margins Research Program (SSMRP) being performed by the University of California Lawrence Livermore Laboratory for the US Nuclear Regulatory Commission, the basic objective of Subtask IV.1 (Structural Building Response Review) is to review and summarize current methods and data pertaining to seismic response calculations particularly as they relate to the objectives of the SSMRP. This material forms one component in the development of the overall computational methodology involving state of the art computations including explicit consideration of uncertainty and aimed at ultimately deriving estimates of the probability of radioactive releases due to seismic effects on nuclear power plant facilities.

  14. LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-10-22

    5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

  15. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  16. Final Project Report for DPD, Inc. Office Building in Lansing, Michigan

    SciTech Connect (OSTI)

    Deru, M.; Sherman, M.

    2003-03-01

    The National Renewable Energy Laboratory participated with DPD, Inc., in the thermal analysis of buildings constructed using concrete with recycled materials in the aggregate. This project was part of a Phase II Small Business Innovative Research grant to determine how the thermal properties of concrete can be''tuned'' for use in passive solar buildings. DPD Inc. and Michigan State University developed techniques to alter the thermal properties of concrete by introducing recycled materials into the aggregate. Two office/retail buildings were built in Lansing, Michigan for this research. The objective of NREL's involvement was to evaluate the effects of concrete thermal properties on the building performance through energy simulations and monitoring. This report presents a summary of work accomplished on this project, including a predesign analysis of the concrete properties and building designs as well as energy performance analysis after construction. The test results were used to calibrate computer models that were later used to predict long-term performance of the buildings.

  17. Small Buildings Small Portfolio Commercial Upstream Incentive Project: Regional Roll-Out- 2014 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Presenter: Todd Levin, Argonne National Laboratory To cost-effectively spur energy efficiency improvements in the small buildings and small portfolios (SBSP) sector, this project is evaluating how to expand commercial upstream incentive approaches to a level that will be nationally replicated.

  18. Implementing Solar PV Projects on Historic Buildings and in Historic Districts

    SciTech Connect (OSTI)

    Kandt, A.; Hotchkiss, E.; Walker, A.; Buddenborg, J; Lindberg, J.

    2011-09-01

    Many municipalities, particularly in older communities of the United States, have a large amount of historic buildings and districts. In addition to preserving these historic assets, many municipalities have goals or legislative requirements to procure a certain amount of energy from renewable sources and to become more efficient in their energy use; often, these requirements do not exempt historic buildings. This paper details findings from a workshop held in Denver, Colorado, in June 2010 that brought together stakeholders from both the solar and historic preservation industries. Based on these findings, this paper identifies challenges and recommends solutions for developing solar photovoltaic (PV) projects on historic buildings and in historic districts in such a way as to not affect the characteristics that make a building eligible for historic status.

  19. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  20. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    SciTech Connect (OSTI)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  1. Building America Case Study: Zero Energy Ready Home Multifamily Project: Mutual Housing at Spring Lake, Woodland, California

    SciTech Connect (OSTI)

    2015-09-01

    Building cost effective, high performance homes that provide superior comfort, health, and durability is the goal of the Department of Energy's (DOE's) Zero Energy Ready Homes (ZERH) program. Through Building America research and other innovative programs throughout the country, many of the technical challenges to building to the ZERH standard have been addressed. This case study describes the development of a 62-unit multifamily community constructed by nonprofit developer Mutual Housing at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH-certified multifamily project nationwide. Building America team Alliance for Residential Building Innovation worked with Mutual Housing throughout the project. The case study discusses challenges encountered, lessons learned, and how obstacles were overcome. An objective of this project was to gain a highly visible foothold for residential buildings built to the DOE ZERH specification that can be used to encourage participation by other California builders.

  2. Building

    U.S. Energy Information Administration (EIA) Indexed Site

    DIV. Electricity Consumption and Expenditure Intensities by Census Division, 1999" ,"Electricity Consumption",,,"Electricity Expenditures" ,"per Building (thousand kWh)","per...

  3. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed reactor system at Building 9212. Draft environmental assessment

    SciTech Connect (OSTI)

    1995-03-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is Iocated within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The current AHF supply and fluidized-bed reactor systems were designed and constructed more than 40 years ago. Because of their deteriorating condition, the corrosive nature of the materials processed, and the antiquated design philosophy upon which they are based, their long-term reliability cannot be assured. The current AHF supply system cannot mitigate an accidental release of AHF and vents fugitive AHF directly to the atmosphere during operations. the proposed action would reduce the risk of exposing the Y-12 Plant work force, the public, and the environment to an accidental release of AHF and would ensure the continuing ability of the Y-12 Plant to manufacture highly enriched uranium metal and process uranium from retired weapons for storage.

  4. Better Buildings Alliance, Advanced Rooftop Unit Campaign: Rooftop Unit Measurement and Verification (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    This document provides facility managers and building owners an introduction to measurement and verification (M&V) methods to estimate energy and cost savings of rooftop units replacement or retrofit projects to estimate paybacks or to justify future projects.

  5. 90 MW build/own/operate gas turbine combined cycle cogeneration project with sludge drying plant

    SciTech Connect (OSTI)

    Schroppe, J.T.

    1986-04-01

    This paper will discuss some of the unique aspects of a build/own/operate cogeneration project for an oil refinery in which Foster Wheeler is involved. The organization is constructing a 90 MW plant that will supply 55 MW and 160,000 lb/hr of 600 psi, 700F steam to the Tosco Corporation's 130,000 bd Avon Oil Refinery in Martinez, California. (The refinery is located about 45 miles northeast of San Francisco.) Surplus power production will be sold to the local utility, Pacific Gas and Electric Co. (PG and E). Many of the aspects of this project took on a different perspective, since the contractor would build, own and operate the plant.

  6. Wood Pellet-Fired Biomass Boiler Project at the Ketchikan Federal Building

    SciTech Connect (OSTI)

    Tomberlin, G.

    2014-06-01

    Biomass boiler systems have existed for many years, but the technology has advanced in recent decades and can now provide automated and efficient operation for a relatively modest investment. Key advances in system monitoring and control allow for lower operating costs, since the control systems run all aspects of the boiler, including feed, load reduction and even tube cleaning. These advances have made such systems economical on a small scale in situations where inexpensive fuels like natural gas are not available. This creates an opportunity for building operators in remote, cold-climate locations to reduce the use of expensive fuels for heating buildings. GSA Region 10 installed the system at the federal building in Ketchikan, Alaska and submitted the project to the Green Proving Ground (GPG) program. GSA's GPG program contracted with the National Renewable Energy Laboratory (NREL) to assess the installation and the technology. The system serves as a demonstration to assess actual system efficiencies, as well as operating characteristics and financial benefits. In addition to installation and operational issues, the project team/researchers examined other issues, including fuel transportation costs, building energy savings, and overall economics.

  7. Building America System Research

    SciTech Connect (OSTI)

    2013-04-01

    Residential Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  8. Building America Technology Solutions for New and Existing Homes:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) | Department of Energy Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) Building America Technology Solutions for New and Existing Homes: Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) In this project, the CARB team tested the Concept 3 replacement motors for residential furnaces in eight homes in and near Syracuse, New York, to test how these

  9. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    SciTech Connect (OSTI)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  10. Building America Expert Meeting: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  11. Building.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant in ITER refers to plant systems located outside the Tokamak Building. A thick wall ... The cooling water system provides for the rejection of heat from a variety of ITER systems ...

  12. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    23 June 2016 Ozark Powerhouse Major Rehabilitation BUILDING STRONG ® * Project Scope: Rehabilitation of the Ozark Powerhouse to include replacement of five turbines, rehabilitation of all cranes, rehab of water Treatment, and misc aux systems * Current Project Cost: $130.7 M * Current Turbine Contract Amount: $105.0 M * Anticipated Completion Date: July 2018 Ozark Scope, Cost and Schedule BUILDING STRONG ® Ozark Funding Status Ozark Rehab Project Estimate $130.7M Cranes, Gates, Generator

  13. ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report

    SciTech Connect (OSTI)

    Levine, M.D.; Busch, J.F.; Deringer, J.J.

    1992-06-01

    Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

  14. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  15. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  16. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  17. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    SciTech Connect (OSTI)

    BAZINET, G.D.

    2000-11-03

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted

  18. FINAL REPORT INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    SciTech Connect (OSTI)

    ERIKA N. BAILEY

    2012-02-29

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  19. Building America Webinar: High Performance Building Enclosures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Webinar: High Performance Building Enclosures: Part I, Existing Homes The webinar, presented on May 21, 2014, focused on specific Building America projects that ...

  20. ASEAN--USAID Buildings Energy Conservation Project final report. Volume 2, Technology

    SciTech Connect (OSTI)

    Levine, M.D.; Busch, J.F.

    1992-06-01

    This volume reports on research in the area of energy conservation technology applied to commercial buildings in the Association of Southeast Asian Nations (ASEAN) region. Unlike Volume I of this series, this volume is a compilation of original technical papers prepared by different authors in the project. In this regard, this volume is much like a technical journal. The papers that follow report on research conducted by both US and ASEAN researchers. The authors representing Indonesia, Malaysia, Philippines, and Thailand, come from a range of positions in the energy arena, including government energy agencies, electric utilities, and universities. As such, they account for a wide range of perspectives on energy problems and the role that technology can play in solving them. This volume is about using energy more intelligently. In some cases, the effort is towards the use of more advanced technologies, such as low-emittance coatings on window glass, thermal energy storage, or cogeneration. In others, the emphasis is towards reclaiming traditional techniques for rendering energy services, but in new contexts such as lighting office buildings with natural light, or cooling buildings of all types with natural ventilation. Used in its broadest sense, the term ``technology`` encompasses all of the topics addressed in this volume. Along with the more customary associations of technology, such as advanced materials and equipment and the analysis of their performance, this volume treats design concepts and techniques, analysis of ``secondary`` impacts from applying technologies (i.e., unintended impacts, or impacts on parties not directly involved in the purchase and use of the technology), and the collection of primary data used for conducting technical analyses.

  1. Controlling Beryllium Contaminated Material And Equipment For The Building 9201-5 Legacy Material Disposition Project

    SciTech Connect (OSTI)

    Reynolds, T. D.; Easterling, S. D.

    2010-10-01

    This position paper addresses the management of beryllium contamination on legacy waste. The goal of the beryllium management program is to protect human health and the environment by preventing the release of beryllium through controlling surface contamination. Studies have shown by controlling beryllium surface contamination, potential airborne contamination is reduced or eliminated. Although there are areas in Building 9201-5 that are contaminated with radioactive materials and mercury, only beryllium contamination is addressed in this management plan. The overall goal of this initiative is the compliant packaging and disposal of beryllium waste from the 9201-5 Legacy Material Removal (LMR) Project to ensure that beryllium surface contamination and any potential airborne release of beryllium is controlled to levels as low as practicable in accordance with 10 CFR 850.25.

  2. Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings

    SciTech Connect (OSTI)

    Page, Janie; Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann; Chiu, Albert K.; Kellow, Bashar; Koch, Ed; Lipkin, Paul

    2011-07-01

    Small and medium commercial customers in California make up about 20-25% of electric peak load in California. With the roll out of smart meters to this customer group, which enable granular measurement of electricity consumption, the investor-owned utilities will offer dynamic prices as default tariffs by the end of 2011. Pacific Gas and Electric Company, which successfully deployed Automated Demand Response (AutoDR) Programs to its large commercial and industrial customers, started investigating the same infrastructures application to the small and medium commercial customers. This project aims to identify available technologies suitable for automating demand response for small-medium commercial buildings; to validate the extent to which that technology does what it claims to be able to do; and determine the extent to which customers find the technology useful for DR purpose. Ten sites, enabled by eight vendors, participated in at least four test AutoDR events per site in the summer of 2010. The results showed that while existing technology can reliably receive OpenADR signals and translate them into pre-programmed response strategies, it is likely that better levels of load sheds could be obtained than what is reported here if better understanding of the building systems were developed and the DR response strategies had been carefully designed and optimized for each site.

  3. Pilot project for a commercial buildings Energy Analysis and Diagnostic Center (EADC) program. Final report

    SciTech Connect (OSTI)

    Capehart, B.L.

    1996-02-01

    Commercial energy use costs businesses around $70 billion annually. Many of these businesses are small and medium sized organizations that do not have the resources to help themselves, or to pay for professional engineering services to help reduce their energy costs and improve their economic competitiveness. Energy cost reduction actions with payback times of around two years could save the commercial sector 15--20%, or $10--$15 billion per year. This project was initially intended to evaluate the feasibility of performing commercial energy audits as an adjunct to the industrial audit program run by the US Department of Energy Industrial Office. This program is housed in 30 universities throughout the United States. Formerly known as Energy Analysis and Diagnostic Centers (EADC`s), the university programs are now called Industrial Assessment Centers (IAC`s) to reflect their expansion from energy use analyses to include waste and productivity analyses. The success of the EADC/IAC program in helping the manufacturing sector provides an excellent model for a similar program in the commercial buildings sector. This project has investigated using the EADC/IAC approach to performing energy audits for the commercial sector, and has determined that such an approach is feasible and cost effective.

  4. Building a Universal Nuclear Energy Density Functional (UNEDF): SciDAC-2 Project

    SciTech Connect (OSTI)

    Carlson, Joe; Furnstahl, Dick; Lusk, Rusty; Nazarewicz, Witek; Ng, Esmond; Thompson, Ian; Vary, James

    2012-06-30

    An understanding of the properties of atomic nuclei is crucial for a complete nuclear theory, for element formation, for properties of stars, and for present and future energy and defense applications. During the period of Dec. 1, 2006 - Jun. 30, 2012, the UNEDF collaboration carried out a comprehensive study of all nuclei based on the most accurate knowledge of the strong nuclear interaction, the most reliable theoretical approaches, the most advanced algorithms, and extensive computational resources, with a view towards scaling to the petaflop platforms and beyond. The long-term vision initiated with UNEDF is to arrive at a comprehensive, quantitative, and unified description of nuclei and their reactions, grounded in the fundamental interactions between the constituent nucleons. We seek to replace current phenomenological models of nuclear structure and reactions with a well-founded microscopic theory that delivers maximum predictive power with well-quantified uncertainties. Specifically, the mission of this project has been three-fold: first, to find an optimal energy density functional (EDF) using all our knowledge of the nucleonic Hamiltonian and basic nuclear properties; second, to apply the EDF theory and its extensions to validate the functional using all the available relevant nuclear structure and reaction data; and third, to apply the validated theory to properties of interest that cannot be measured, in particular the properties needed for reaction theory.

  5. NNSA projects win Secretary's Achievement Awards for cost savings...

    National Nuclear Security Administration (NNSA)

    The project replaced electrical, ventilation, steam, and cooling water systems in two Y-12 production buildings that dated back to the 1940s. "This team's success on the Nuclear ...

  6. Implementing Solar Photovoltaic Projects on Historic Buildings and in Historic Districts

    SciTech Connect (OSTI)

    Kandt, A.; Hotchkiss, E.; Walker, A.

    2011-01-01

    help to preserve those properties for future generations. At the national level, the National Register of Historic Places includes more than 86,000 listings, which encompass a total of more than 1.6 million historic resources. State registers of historic places also provide recognition and protection for historic sites and districts. Locally, more than 2,400 communities have established historic preservation ordinances. Typically implemented through zoning overlays, these local land use regulations manage changes to hundreds of thousands of historic properties. Over a period of 2 years (2007 and 2008) the U.S. Department of Energy (DOE) designated 25 major U.S. cities as Solar America Cities. DOE provided financial and technical assistance to help the cities develop comprehensive approaches to accelerate the adoption of solar energy technologies. The Solar America Cities partnerships represent the foundation of DOE's larger Solar America Communities program. As a part of this program, DOE identified the implementation of solar projects on historic properties and in historic districts as one area to address. A workshop titled 'Implementing Solar Projects on Historic Buildings and in Historic Districts' was held in Denver, Colorado, in June of 2010. Participants included representatives from the solar industry as well as historic preservationists from nonprofit organizations and government agencies at the local, state, and national levels. The workshop provided an opportunity to gain a common understanding of solar technologies and historic preservation procedures and priorities. The workshop participants also discussed some of the challenges involved in locating PV systems on historic properties and identified potential solutions. This publication is based on the discussions that occurred at this workshop and the recommendations that were developed by participants. Ideas expressed by participants in the workshop, and included in this document, do not necessarily reflect

  7. Database Aids Building Owners and Operators in Energy-Efficiency Project Decision Making

    Broader source: Energy.gov [DOE]

    EERE's Buildings Performance Database, launched in June 2013, provides access to empirical data on the actual energy performance, as well as physical and operational characteristics of commercial and residential buildings.

  8. Energy Efficiency Pilot Projects in Jaipur: Testing the Energy Conservation Building Code

    SciTech Connect (OSTI)

    Evans, Meredydd; Mathur, Jyotirmay; Yu, Sha

    2014-03-26

    The Malaviya National Institute of Technology (MNIT) in Jaipur, India is constructing two new buildings on its campus that allow it to test implementation of the Energy Conservation Building Code (ECBC), which Rajasthan made mandatory in 2011. PNNL has been working with MNIT to document progress on ECBC implementation in these buildings.

  9. Better Buildings Energy Data Accelerator

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Energy Data Accelerator *NEW PROJECT* 2014 Building Technologies Office ... 5. Successfully provide whole-building data access to 20% of included building owners ...

  10. Fort Irwin integrated resource assessment. Volume 3: Sitewide Energy Project identification for buildings and facilities

    SciTech Connect (OSTI)

    Keller, J.M.; Dittmer, A.L.; Elliott, D.B.; McMordie, K.L.; Richman, E.E.; Stucky, D.J.; Wahlstrom, R.R.; Hadley, D.L.

    1995-02-01

    The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.

  11. 324 Building Compliance Project: Selection and evaluation of alternatives for the removal of solid remote-handled mixed wastes from the 324 Building

    SciTech Connect (OSTI)

    Ross, W.A.; Bierschbach, M.C.; Dukelow, J.S. Jr.

    1995-06-01

    Six alternatives for the interim storage of remote-handled mixed wastes from the 324 Building on the Hanford Site have been identified and evaluated. The alternatives focus on the interim storage facility and include use of existing facilities in the 200 Area, the construction of new facilities, and the vitrification of the wastes within the 324 Building to remove the majority of the wastes from under RCRA regulations. The six alternatives are summarized in Table S.1, which identifies the primary facilities to be utilized, the anticipated schedule for removal of the wastes, the costs of the transfer from 324 Building to the interim storage facility (including any capital costs), and an initial risk comparison of the alternatives. A recently negotiated Tri-Party Agreement (TPA) change requires the last of the mixed wastes to be removed by May 1999. The ability to use an existing facility reduces the costs since it eliminates the need for new capital construction. The basic regulatory approvals for the storage of mixed wastes are in place for the PUREX facility, but the Form HI permit will need some minor modifications since the 324 Building wastes have some additional characteristic waste codes and the current permit limits storage of wastes to those from the facility itself. Regulatory reviews have indicated that it will be best to use the tunnels to store the wastes. The PUREX alternatives will only provide storage for about 65% of the wastes. This results from the current schedule of the B-Cell Clean Out Project, which projects that dispersible debris will continue to be collected in small quantities until the year 2000. The remaining fraction of the wastes will then be stored in another facility. Central Waste Complex (CWC) is currently proposed for that residual waste storage; however, other options may also be available.

  12. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedial action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.

  13. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  14. Southeast Energy Efficiency Alliance's Building Energy Codes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southeast Energy Efficiency Alliance's Building Energy Codes Project Southeast Energy Efficiency Alliance's Building Energy Codes Project Building Codes Project for the 2013 ...

  15. Sault Ste. Marie Tribe of Chippewa Indians- 2011 Building Energy Efficiency Audit Project

    Broader source: Energy.gov [DOE]

    The Sault Tribe will conduct energy audits of tribally owned governmental buildings located across three counties in the Upper Peninsula of Michigan.

  16. Buildings Database

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Efficiency & Renewable Energy EERE Home | Programs & Offices | Consumer Information Buildings Database Welcome Guest Log In | Register | Contact Us Home About All Projects...

  17. Portsmouth Proposed Plan for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project

    Broader source: Energy.gov [DOE]

    DOE has evaluated alternatives for demolishing the buildings at the Portsmouth Site. Two remedial alternatives were developed for consideration. This Proposed Plan describes the required no-action alternative (Alternative 1) and a D&D alternative (Alternative 2). The preferred alternative is Alternative 2, controlled demolition of the process buildings and complex facilities.

  18. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era Building

    Broader source: Energy.gov [DOE]

    Beta 4, one of the oldest and largest buildings at the Y-12 National Security Complex, recently reached a significant cleanup milestone. The second floor of the building, more than 82,000 square feet, has been cleared of large equipment and waste from Cold War operations.

  19. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soil beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  20. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  1. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  2. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soil beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  3. Canister storage building compliance assessment SNF project NRC equivalency criteria - HNF-SD-SNF-DB-003

    SciTech Connect (OSTI)

    BLACK, D.M.

    1999-08-11

    This document presents the Project's position on compliance with the SNF Project NRC Equivalency Criteria--HNF-SD-SNF-DE-003, Spent Nuclear Fuel Project Path Forward Additional NRC Requirements. No non-compliances are shown The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion.

  4. Better Buildings Residential Network Peer Exchange Call Series: Generating Energy Efficiency Project Leads and Allocating Leads to Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Energy Efficiency Project Leads and Allocating Leads to Contractors Call Slides and Discussion Summary February 26, 2015 Call Participants  Build It Green  City of Chula Vista  City of Philadelphia  Civic Works/Retrofit Baltimore  Clean Energy Durham  Clean Energy Works  Community Office for Resource Efficiency  Dr. Energy Saver  Efficiency Maine  Efficiency Nova Scotia  Energy Efficiency Specialists, LLC  Energy Pioneer Solutions  Greater

  5. Cost Control Best Practices for Net Zero Energy Building Projects: Preprint

    SciTech Connect (OSTI)

    Leach, M.; Pless, S.; Torcellini, P.

    2014-02-01

    For net zero energy (NZE) buildings to become the norm in commercial construction, it will be necessary to design and construct these buildings cost effectively. While industry leaders have developed workflows (for procurement, design, and construction) to achieve cost-effective NZE buildings for certain cases, the expertise embodied in those workflows has limited penetration within the commercial building sector. Documenting cost control best practices of industry leaders in NZE and packaging those strategies for adoption by the commercial building sector will help make the business case for NZE. Furthermore, it will promote market uptake of the innovative technologies and design approaches needed to achieve NZE. This paper summarizes successful cost control strategies for NZE procurement, design, and construction that key industry users (such as building owners, architects, and designers) can incorporate into their everyday workflows. It will also evaluate the current state of NZE economics and propose a path forward for greater market penetration of NZE buildings. By demonstrating how to combine NZE technologies and design approaches into an overall efficiency package that can be implemented at minimal (zero, in certain cases) incremental capital cost, the domain of NZE design and construction can be expanded from a niche market to the commercial construction mainstream.

  6. Challenges in Commercial Buildings | Buildings | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Working on real building projects with a range of large institutional and private sector ... AERGs to real buildings in collaboration with institutional and private sector partners. ...

  7. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22 June 2016 Webbers Falls Powerhouse Major Rehabilitation BUILDING STRONG ® * Project Scope: Replace three turbines, rewind three generators and rehabilitate all cranes, tailrace and intake gates and bulkheads. * Total Project cost, including turbines, generator, gates, cranes, governors and misc: $87.6M ($82.8M customer funded) * Turbine Contract Awarded: February 2008 * Original Awarded Turbine Contract Amount: $39.3M * Current Turbine Contract Amount: $54.88M * Current Required Completion

  8. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    SciTech Connect (OSTI)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  9. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self?funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty?three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  10. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  11. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  12. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  13. 100 Area D4 Project Building Completion Report: December 2008 to December 2009

    SciTech Connect (OSTI)

    K.G. Finucane, J.P. Harrie

    2010-10-26

    This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009.

  14. City of Santa Monica- Building Permit Fee Waiver for Solar Projects

    Broader source: Energy.gov [DOE]

    In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff...

  15. Reshaping Its Skyline: Y-12 Receives Approval to Begin Multi-Building Demolition Project

    Broader source: Energy.gov [DOE]

    A major step toward a skyline changing transformation at Y-12 will commence in Spring 2010 as demolition begins on four buildings in the former Biology Complex, visible from the site’s main entrance.

  16. Project Profile: Transformational Approach to Reducing the Total System Costs of Building-Integrated Photovoltaics

    Broader source: Energy.gov [DOE]

    The Dow Chemical Company, under the BOS-X funding opportunity, has launched a transformational product in the building-integrated photovoltaics (BIPV) industry: the Dow POWERHOUSE Solar Shingle.

  17. Whole Building Performance-Based Procurement Training

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  18. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1 was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  19. Final deactivation project report on the Integrated Process Demonstration Facility, Building 7602 Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed.

  20. New York Completes Smart Grid Project to Build a More Reliable, Resilient Power Grid

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department recognized the completion of New York Independent System Operator’s smart grid and control center project in Rensselaer, New York.

  1. 300 Area D4 Project 2nd Quarter FY06 Building Completion Report

    SciTech Connect (OSTI)

    David S. Smith

    2006-06-26

    This report documents the deactivation, decontamination, decommissioning, and demolition of 16 buildings in the 300 Area of the Hanford Site. The D4 of these facilities included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation as appropriate.

  2. 300 Area D4 Project 3rd Quarter Fiscal Year 2006 Building Completion Report

    SciTech Connect (OSTI)

    D. S. Smith

    2006-09-25

    This report documents the deactivation, decontamination, decommissioning, and demolition of five buildings in the 300 Area of the Hanford Site. The D4 of these facilities included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation as appropriate.

  3. 4 Small Businesses Selected to Collaborate with National Labs on Building Technologies Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has selected 33 small businesses, including 4 businesses working on buildings related issues, to work directly with DOE national labs to accelerate the transformation toward a clean energy economy. The selected businesses will be afforded access to world-class laboratory resource to help move these innovative ideas and technologies closer to the marketplace.

  4. 300 Area D4 Project Fiscal Year 2007 Building Completion Report

    SciTech Connect (OSTI)

    R. A. Westberg

    2009-01-15

    This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of twenty buildings in the 300 Area of the Hanford Site. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.

  5. NNSA Receives Secretary's Award for Project Management Excellence |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Receives Secretary's Award for Project Management Excellence April 02, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) was recently presented with the Secretary's Award for Project Management Excellence for delivering the Chemistry and Metallurgy Research Building Replacement (CMRR) Radiological Laboratory/Utility/Office Building (RLUOB) Equipment Installation (REI) Project $2 million under budget and ahead of

  6. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  7. DQO Summary Report for 324 and 327 Building Hot Cells D4 Project Waste Characterization

    SciTech Connect (OSTI)

    T.A. Lee

    2006-02-06

    This data quality objective (DQO) summary report provides the results of the DQO process conducted for waste characterization activities for the 324 and 327 Building hot cells decommission, deactivate, decontaminate, and demolish activities. This DQO summary report addresses the systems and processes related to the hot cells, air locks, vaults, tanks, piping, basins, air plenums, air ducts, filters, an adjacent elements that have high dose rates, high contamination levels, and/or suspect transuranic waste, which will require nonstandard D4 techniques.

  8. 300 Area D4 Project Fiscal Year 2009 Building Completion Report

    SciTech Connect (OSTI)

    B. J. Skwarek

    2010-01-27

    This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

  9. 300 Area D4 Project Fiscal Year 2008 Building Completion Report

    SciTech Connect (OSTI)

    R. A. Westberg

    2009-01-15

    This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of eighteen buildings in the 300 Area of the Hanford Site that were demolished in Fiscal Year 2008. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.

  10. Buildings*","Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    Water-Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Buildings with Water Heating","Water-Heating ...

  11. Webinar: The L Prize-Winning LED A19 Replacement-What Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The L Prize-Winning LED A19 Replacement-What Commercial Building OwnersOperators Can Expect in 2012 Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building ...

  12. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    SciTech Connect (OSTI)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-02-26

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment.

  13. ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

    SciTech Connect (OSTI)

    Deru, M.; Field, K.; Punjabi, S.

    2014-08-01

    In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

  14. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    SciTech Connect (OSTI)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in the following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.

  15. Energy Replacement Generation Tax Exemption

    Broader source: Energy.gov [DOE]

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  16. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gates Replacement This project is part of the Third Powerplant overhaul at Grand Coulee Dam. The full overhaul effort involves a mechanical overhaul of units G19 - G24. The...

  17. Better Buildings Neighborhood Program: BetterBuildings Lowell Final Report

    SciTech Connect (OSTI)

    Heslin, Thomas

    2014-01-31

    The City of Lowell set four goals at the beginning of the Better Buildings Neighborhood Program: 1. Improve the Downtown Historic Park District’s Carbon Footprint 2. Develop a sustainable and replicable model for energy efficiency in historic buildings 3. Create and retain jobs 4. Promote multi-stakeholder partnerships The City of Lowell, MA was awarded $5 million in May 2010 to conduct energy efficiency retrofits within the downtown National Historical Park (NHP). The City’s target was to complete retrofits in 200,000 square feet of commercial space and create 280 jobs, while adhering to the strict historical preservation regulations that govern the NHP. The development of a model for energy efficiency in historic buildings was successfully accomplished. BetterBuildings Lowell’s success in energy efficiency in historic buildings was due to the simplicity of the program. We relied strongly on the replacement of antiquated HVAC systems and air sealing and a handful of talented energy auditors and contractors. BetterBuildings Lowell was unique for the Better Buildings Neighborhood Program because it was the only program that focused solely on commercial properties. BetterBuildings Lowell did target multi-family properties, which were reported as commercial, but the majority of the building types and uses were commercial. Property types targeted were restaurants, office buildings, museums, sections of larger buildings, mixed use buildings, and multifamily buildings. This unique fabric of building type and use allows for a deeper understanding to how different properties use energy. Because of the National Historical Park designation of downtown Lowell, being able to implement energy efficiency projects within a highly regulated historical district also provided valuable research and precedent proving energy efficiency projects can be successfully completed in historical districts and historical buildings. Our program was very successful in working with the local

  18. BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BUILDING STRONG ® WATER SUPPLY STORAGE REALLOCATION STUDIES BUILDING STRONG ® Beaver Lake Project Area BUILDING STRONG ® M&I Water Supply Reallocation - Beaver Lake * Current Study - Total Request for 22 mgd (41,960 ac-ft)  Benton Washington in 2000 for 12.0 mgd (22,887.11 ac-ft)  Carroll Boone in 2001 for 6.0 mgd (11,443.66 ac-ft)  Madison County in 2006 for 4.0 mgd (7,629.04 ac-ft) BUILDING STRONG ® M&I Water Supply Reallocation - Beaver Lake Continued. . . * Current Tasks

  19. Building America Efficient Solutions for Existing Homes: Case Study: Build

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    San Antonio Green, San Antonio, Texas | Department of Energy Homes: Case Study: Build San Antonio Green, San Antonio, Texas Building America Efficient Solutions for Existing Homes: Case Study: Build San Antonio Green, San Antonio, Texas PNNL, FSEC, and CalcsPlus provided technical assistance to Build San Antonio Green on three deep energy retrofits. For this gut rehab they replaced the old roof with a steeper roof and replaced drywall while adding insulation, new HVAC, sealed ducts, transfer

  20. Building a Universal Nuclear Energy Density Functional (UNEDF). SciDAC-2 Project

    SciTech Connect (OSTI)

    Vary, James P.; Carlson, Joe; Furnstahl, Dick; Horoi, Mihai; Lusk, Rusty; Nazarewicz, Witek; Ng, Esmond; Thompson, Ian

    2012-09-29

    An understanding of the properties of atomic nuclei is crucial for a complete nuclear theory, for element formation, for properties of stars, and for present and future energy and defense applications. During the period of Dec. 1 2006 – Jun. 30, 2012, the UNEDF collaboration carried out a comprehensive study of all nuclei, based on the most accurate knowledge of the strong nuclear interaction, the most reliable theoretical approaches, the most advanced algorithms, and extensive computational resources, with a view towards scaling to the petaflop platforms and beyond. Until recently such an undertaking was hard to imagine, and even at the present time such an ambitious endeavor would be far beyond what a single researcher or a traditional research group could carry out. The UNEDF SciDAC project has developed several key computational codes and algorithms for reaching the goal of solving the nuclear quantum many-body problem throughout the chart of nuclei. Without such developments, scientific progress would not be possible. In addition the UNEDF SciDAC successfully applied these developments to solve many forefront research problems.

  1. Better Buildings Alliance Equipment Performance Specifications- 2013 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  2. Energy Management Systems Package for Small Commercial Buildings

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  3. Financing Turnkey Efficiency Solutions for Small Buildings and Small Portfolios

    Broader source: Energy.gov [DOE]

    Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

  4. Building America Technology Solutions for New and Existing Homes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacing Resistance Heating with Mini-Split Heat Pumps Building America Technology Solutions for New and Existing Homes: Replacing Resistance Heating with Mini-Split Heat Pumps In...

  5. Chapter 8, Whole-Building Retrofit with Billing Analysis Evaluation Protocol: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Whole-Building Retrofit with Consumption Data Analysis Evaluation Protocol Ken Agnew and Mimi Goldberg, DNV KEMA Subcontract Report NREL/SR-7A30-53827 April 2013 The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures 8 - 1 Chapter 8 - Table of Contents 1 Measure Description ...............................................................................................................2 2 Application Conditions of Protocol

  6. Forrest County, MS Geothermal Project--Final Report

    SciTech Connect (OSTI)

    Proctor, Corey

    2014-03-13

    The Forrest County Geothermal Energy Project consists of replacing the existing air cooled chiller with geothermal water to water chillers for energy savings at the Forrest County Multi-Purpose Center. The project will also replace DX/gas rooftop and DX split system heat pump equipment with geothermal units for the Forrest County Jail. Each of the aforementioned projects consists of approximately 400 tons of cooling. The project also includes between 600 and 800 geothermal closed-loop wells. Building controls will be updated as well on both sites.

  7. EERE Success Story—Database Aids Building Owners and Operators in Energy-Efficiency Project Decision Making

    Broader source: Energy.gov [DOE]

    EERE's Buildings Performance Database, launched in June 2013, provides access to empirical data on the actual energy performance, as well as physical and operational characteristics of commercial and residential buildings.

  8. Ion replacement electrorefining

    SciTech Connect (OSTI)

    Willit, J.L.; Tomczuk, Z.; Miller, W.E.; Laidler, J.J.

    1994-04-01

    We are developing a two-step electrochemical process for purifying and separating metals called ion replacement electrorefining. In each step, metal cations formed by oxidation at an electrode replace other metal cations that are reduced at another elecmae. Using this approach, we have separated or purified uranium, dysprosium, and lanthanum on a laboratory scale. This paper explains the ion replacement concept and presents results of these demonstration experiments.

  9. Acoustic Building Infiltration Measurement System (ABIMS)

    Broader source: Energy.gov [DOE]

    The Acoustic Building Infilitration Measurement System project is developing an acoustic method of measuring the infiltration of a building envelope.

  10. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Broader source: Energy.gov (indexed) [DOE]

    Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

  11. Buildings Technology Office Residential Buildings Integration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Summaries Building America, ARIES: High Performance Factory Built Housing Presenter: Jordan Dentz, ARIESThe Levy Partnership Project Goal Provide factory homebuilders with high ...

  12. Radiation Source Replacement Workshop

    SciTech Connect (OSTI)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  13. Building America Research-to-Market Process

    Broader source: Energy.gov [DOE]

    The Building America Program conducts applied research, development, and deployment in residential buildings. Building America projects are led by U.S. Department of Energy (DOE) national...

  14. Building Energy Modeling Library - 2013 BTO Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Energy Modeling Library - 2013 BTO Peer Review Building Energy Modeling Library - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building...

  15. Design criteria for lighting and controls modifications OSW, CTF, COS buildings

    SciTech Connect (OSTI)

    1991-08-01

    This project will retrofit the lighting systems in three (3) buildings at the Mound Plant. The buildings are Central Operational Support (COS), Component Test Facility (CTF) and operational Support West (OSW). This project consists of the installation of occupancy sensors in private offices, break areas and laboratories, automatic control lighting, (occupied/unoccupied) with the existing DDC system, removing selected light fixtures, replacing incandescent lighting and reprogramming some of the software controlling the operation of the air handling units in the a forementioned buildings.

  16. Portsmouth RI/FS Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    This remedial investigation/feasibility study (RI/FS), the Remedial Investigation and Feasibility Study Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning...

  17. Final deactivation project report on the Source Development Laboratory, building 3029, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-05-01

    The purpose of this report is to document the condition of Building 3029 after completion of deactivation activities as outlined by the DOE Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration (EM-40). This report provides a history and profile of the facility prior to commencing deactivation activities and a profile of the building after completion of deactivation activities. Turnover items, such as the post-deactivation surveillance and maintenance (S&M) plan, remaining hazardous materials, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the EM-60 turnover package are discussed. Building 3029 will require access to facilitate required S&M activities to maintain the building safety envelope. building 3029 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S&M effort would be required to maintain the building safety envelope. Other than the minimal S&M activities, the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S&M. 5 refs., 7 figs., 3 tabs.

  18. Spent Nuclear Fuel project stage and store K basin SNF in canister storage building functions and requirements. Revision 1

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-10-24

    This document establishes the functions and requirements baseline for the implementation of the Canister Storage Building Subproject. The mission allocated to the Canister Storage Building Subproject is to provide safe, environmentally sound staging and storage of K Basin SNF until a decision on the final disposition is reached and implemented

  19. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  20. Building Energy Code

    Broader source: Energy.gov [DOE]

    Note: Much of the information presented in this summary is drawn from the U.S. Department of Energys (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

  1. Building Energy Code

    Office of Energy Efficiency and Renewable Energy (EERE)

    Note: Much of the information presented in this summary is drawn from the U.S. Department of Energy’s (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

  2. Building Energy Code

    Broader source: Energy.gov [DOE]

    Much of the information presented in this summary is drawn from the U.S. Department of Energy’s (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more deta...

  3. Building Energy Code

    Broader source: Energy.gov [DOE]

    Much of the information presented in this summary is drawn from the U.S. Department of Energy’s (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

  4. Guam- Building Energy Code

    Broader source: Energy.gov [DOE]

    Much of the information presented in this summary is drawn from the U.S. Department of Energy’s (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

  5. Building America Technology Solutions for New and Existing Homes...

    Broader source: Energy.gov (indexed) [DOE]

    Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, ... Expert Meeting: Multifamily Hydronic and Steam Heating Controls and Distribution ...

  6. Whole Building Energy Simulation

    Broader source: Energy.gov [DOE]

    Whole building energy simulation, also referred to as energy modeling, can and should be incorporated early during project planning to provide energy impact feedback for which design considerations...

  7. Transamerica Pyramid Building

    SciTech Connect (OSTI)

    2010-04-01

    This is a combined heat and power (CHP) project profile on a 1 MW CCHP system at the Transamerica Pyramid Building in San Francisco, California.

  8. New Buildings Program

    Broader source: Energy.gov [DOE]

    Energy Trust of Oregon offers commercial businesses in Oregon a menu of services and incentives for new building construction or major renovation projects which utilize energy efficient equipment...

  9. Building Energy Modeling Library

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Modeling (BEM) Library TDM - Amir Roth Ellen Franconi Rocky Mountain Institute ... Project Overview Building Energy Modeling (BEM) Library * Define and develop a ...

  10. The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

    SciTech Connect (OSTI)

    Chaloupka, Allan B.; Finn, Kevin P.; Parsons, Duane A.

    2012-07-01

    When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200

  11. BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BUILDING STRONG ® Progress  Engaged with Customers in January 2016  Reached out to USBR on Customer Funding of O&M for Sacramento Projects  Reached out to NWD for the Metrics and gathering of the data  Data Mining 5 years of labor data  Gathered information on past and current staffing of plats 5 BUILDING STRONG ® Delivery dates  Late August 2016- Labor Data and manpower  DRAFT metrics to SWPA- October 2016  Meet with Customer Team- November- December 2016 6

  12. Operation Redwing. Project 3. 1. Effect of length of positive phase of blast on drag-type and semidrag-time industrial buildings

    SciTech Connect (OSTI)

    Sinnamon, G.K.; Haltiwanger, J.D.; Newmark, N.M.

    1985-09-01

    The primary objective of the project was to obtain information regarding the effect of the length of the positive phase of blast on the response of drag and semidrag structures. A total of six steel-frame buildings were tested during this operation. The structure of each type nearest ground zero was located such that if the yield of the weapon was near the lower limit of its predicted range, it would probably undergo considerable inelastic deformation. Conversely, those structures farthest from ground zero were located such that if the yield of the nuclear device was near the upper limit of its predicted range, they would be substantially deformed, but would not collapse. The third building of each type was located at an intermediate point between these two extremes. Instrumentation was provided to obtain records of the transient structural deflections, strains, and accelerations, as well as of overpressure and dynamic pressure versus time at the sites of the various test structures.

  13. Green Buildings

    SciTech Connect (OSTI)

    Ruppert, Benjamin; Elliot, Phillip

    2012-08-15

    This award was split into five tasks, HVAC replacement, lighting retrofitting, daylight harvesting, data center virtualization, and traffic signal retrofitting. The first three tasks were combined into an Energy Performance Contract on seven City facilities. This allowed for the total cost of the project to be offset by guaranteed savings over a 14 year period. The other two projects where done by separate vendors and successfully completed. The combination of these five tasks will result in a significant reduction in our energy consumption city wide, and will also translate to savings for the taxpayer on utility costs. There were also additional financial savings to the taxpayer not related to energy reduction that added value to these projects which will be discussed below.

  14. Commercial Building Partnership | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Commercial Building Partnership Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review commlbldgs10_hirsch_040313.pdf (750.65 KB) More Documents & Publications Whole Building Performance-Based Procurement Training Building America Webinar: Put New Tools and Content on the Building America Solution Center To Work for You! Building Science Solutions … Faster and Better

  15. Building Energy Codes Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program U.S. Department of Energy Building Technologies Office Jeremy Williams, Project Manager Building Technologies Peer Review April 2014 Presentation Overview: * Introduction * Statutory Requirements * Program Structure * Recent accomplishments 2 Introduction: Background NATIONAL STATE LOCAL Building codes are developed through national industry consensus processes with input from industry representatives, trade organizations, government officials, and the general public Model energy codes

  16. ARRANGEMENT FOR REPLACING FILTERS

    DOE Patents [OSTI]

    Blomgren, R.A.; Bohlin, N.J.C.

    1957-08-27

    An improved filtered air exhaust system which may be continually operated during the replacement of the filters without the escape of unfiltered air is described. This is accomplished by hermetically sealing the box like filter containers in a rectangular tunnel with neoprene covered sponge rubber sealing rings coated with a silicone impregnated pneumatic grease. The tunnel through which the filters are pushed is normal to the exhaust air duct. A number of unused filters are in line behind the filters in use, and are moved by a hydraulic ram so that a fresh filter is positioned in the air duct. The used filter is pushed into a waiting receptacle and is suitably disposed. This device permits a rapid and safe replacement of a radiation contaminated filter without interruption to the normal flow of exhaust air.

  17. Oak Ridge D and D Plan 3515 Project - Technology Review (2007) and GammaCam Technology Demonstration for Characterizing Building 3515 at Oak Ridge (2007)

    SciTech Connect (OSTI)

    Byrne-Kelly, D.; Hart, A.; Brown, Ch.; Jordan, D.; Phillips, E.

    2008-07-01

    This paper presents the results from the Characterization, Decontamination and Decommissioning (CD and D) Study performed by MSE Technology Application, Inc. (MSE) to assist the U.S. Department of Energy (DOE) and Oak Ridge National Laboratory (ORNL) in the preparation of a Project Execution Plan and Remediation Plan for Building 3515 at ORNL. Primary objectives of this study were to identify innovative CD and D technologies and methodologies and recommend alternatives applicable to the CD and D of Building 3515. Building 3515 is a small heavily shielded concrete and cement block structure centrally located in the Bethel Valley portion of the ORNL. The building's interior is extensively contaminated with Cesium 137 (Cs-137), the primary contaminant of concern. A previous attempt to characterize the building was limited to general interior area radiation exposure level measurements and a few surface smears gathered by inserting monitoring equipment into the building on long poles. Consequently, the spatial distribution of the gamma radiation source inside the building was not determined. A subsequent plan for D and D of the building presented a high risk of worker radiation dose in excess of as low as reasonably achievable (ALARA) because the source of the interior gamma radiation field is not completely understood and conventional practices required workers to be in close proximity of the building. As part of an initial literature search, MSE reviewed new generation gamma source characterization technologies and identified the GammaCam{sup TM} portable gamma ray imaging system as an innovative technology applicable to locating the dominant gamma ray sources within the building. The GammaCam{sup TM} gamma-ray imaging system is a commercially available technology marketed by the EDO Corporation. This system consists of a sensor head with a co-aligned camera and a portable computer. The system is designed to provide two-dimensional spatial mappings of gamma ray

  18. Replacing Lightbulbs and Ballasts | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lighting Replacing Lightbulbs and Ballasts Replacing Lightbulbs and Ballasts Replace frequently used bulbs with more energy efficient options to save money and energy. Replace...

  19. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-20

    The guide supports DOE O 413.3A and provides useful information on the incorporation of high performance sustainable building principles into building-related General Plant Projects and Institutional General Plant Projects at DOE sites. Canceled by DOE G 413.3-6A. Does not cancel other directives.

  20. Fermilab | Directorate | Office of Project Management Oversight...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Project Management Oversight Fermilab ManagementNon-Scientific Projects Current Management Projects IARC OTE Building Liquid Argon Test Building (LArTB) TeV ...

  1. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-28

    This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  2. Final Deactivation Project report on the Alpha Powder Facility, Building 3028, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-04-01

    This report documents the condition of the Alpha Powder Facility (APF), Building 3028, after completion of deactivation activities. Activities conducted to place the facility in a safe and environmentally sound condition for transfer to the U.S. Department of Energy (DOE) Office of Environmental Restoration (EM-40) program are outlined. A history and profile of the facility prior to commencing deactivation activities and a profile of the building after completion of deactivation activities are provided. Turnover items, such as the post-deactivation surveillance and maintenance (S&M) plan, remaining hazardous materials, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided for in the DOE Nuclear Materials and Facility Stabilization Program (EM-60) turnover package are discussed.

  3. ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  4. BUILDING AMERICA PROGRAM EVALUATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BUILDING AMERICA PROGRAM EVALUATION _______________________________ Volume II: Appendices Prepared by: Energy Technology Innovation Project (ETIP) Kennedy School of Government, Harvard University Vicki Norberg-Bohm, Principal Investigator Chad White, Lead Author September 2004 Appendix A. Building America Program Intent and Scope 1 Appendix A-1. Program Overview A-1.1. Program History Building America has its origins in a 1993 pilot project between DOE and a housing products unit at General

  5. Buildings | Buildings | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Index for Commercial Buildings Welcome to the Energy Index for Commercial Buildings. Data for this tool comes from the Energy Information Administration's (EIA) 2003 Commercial Buildings Energy Consumption Survey (CBECS). Select categories from the CBECS micro data allow users to search on common building characteristics that impact energy use. Users may select multiple criteria, however if the resulting sample size is too small, the data will be unreliable. If nothing is selected results

  6. Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.

    SciTech Connect (OSTI)

    Anderson, Temashio

    2013-06-28

    The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

  7. Git Replacement for the

    Energy Science and Technology Software Center (OSTI)

    2014-09-23

    GRAPE is a tool for managing software project workflows for the Git version control system. It provides a suite of tools to simplify and configure branch based development, integration with a project's testing suite, and integration with the Atlassian Stash repository hosting tool.

  8. Building America Case Study: Project Overcoat: Airtightness Strategies and Impacts for 1-1/2 Story Homes, Minneapolis, Minnesota (Fact Sheet)

    SciTech Connect (OSTI)

    None, None

    2014-11-01

    In this second study on solutions to ice dams in 1-1/2 story homes, five test homes located in both cold and very cold climates were analyzed for air leakage reduction rates following modifications by independent contractors on owner-occupied homes. The reason for choosing this house type was they are very common in our area and very difficult to air seal and insulate effectively. Two projects followed a roof-only Exterior Thermal Moisture Management System (ETMMS) process. One project used an interior-only approach to roof air sealing and insulation. The remaining two projects used a deep energy retrofit approach for whole house (foundation wall, above grade wall, roof) air leakage and heat loss reduction. All were asked to provide information regarding project goals, process, and pre and post-blower door test results. Additional air leakage reduction data was provided by several NorthernSTAR Building America industry partners for interior-applied, roof-only modifications on 1-1/2 story homes. The data represents homes in the general market as well as homes that were part of the state of Minnesota weatherization program. A goal was to compare exterior air sealing methods with interior approaches. This pool of data enabled us to compare air tightness data from over 220 homes using similar air seal methods.

  9. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    SciTech Connect (OSTI)

    Hsu, R.H.; Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  10. Nashville Gas treads carefully to replace pipe

    SciTech Connect (OSTI)

    1997-06-01

    The private gas utility, Nashville Gas, was responsible for replacing damaged or inadequate 2- and 4-inch steel gas lines beneath Music City, USA. The line replacements required either size for size or upsizing. The first choice was directional drilling, which was quickly determined to be unpractical because of rocky soil conditions. The second option was open trenching. Undoubtedly, trenching would mean having to contend with angry residents and tourists, since gas lines ran beneath yards, mature trees, sidewalks, roadways, and railways. In addition to the negative social factors, trenching would require additional funds for substantial landscaping and pavement replacement. It at all possible, a no-dig alternative was desired. Nashville Gas found Grundomat piercing tools which create a bore, then pushes pipe back through it. These same tools can simultaneously pull in pipe. These tools were customized for the Nashville project.

  11. Whole Building Performance-Based Procurement Training | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Whole Building Performance-Based Procurement Training Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review PDF icon...

  12. Air Barriers for Residential and Commercial Buildings | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Air Barriers for Residential and Commercial Buildings Air Barriers for Residential and Commercial Buildings Emerging Technologies Project for the 2013 Building Technologies ...

  13. Atomic Sandblasters Could Replace Silicon

    Broader source: Energy.gov [DOE]

    Scientists at the National Labs may have found a cheaper, lighter more efficient replacement for silicon in computer chips.

  14. Ball State building massive geothermal system

    Broader source: Energy.gov [DOE]

    Ball State University is building America’s largest ground source district geothermal heating and cooling system. The new operation will save the school millions of dollars, slash greenhouse gases and create jobs. The project will also “expand how America will define the use of geothermal technology on a district-wide scale,” and provide health benefits such as reducing asthma rates for Indiana residents, says Philip Sachtleben, Ball State’s associate vice president of governmental relations. The system will cool and heat nearly 50 buildings on Ball State’s Muncie, Ind., campus, replace four coal-burning boilers and span more than 600 acres. The switch to geothermal will save the university $2.2 million in fuel costs and cut its carbon footprint in half.

  15. Metal Buildings- 2014 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Presenter: Heather Buckberry, Oak Ridge National Laboratory This project aims to increase energy efficiency in metal buildings through research into areas specifically targeted by metal building industry leaders.

  16. City of San Francisco- Green Building Code

    Broader source: Energy.gov [DOE]

    San Francisco adopted a mandatory green building code for new construction projects in September 2008, establishing strict guidelines for residential and commercial buildings according to the...

  17. Administration Building demolition completed under budget

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Building demolition completed under budget Administration Building demolition completed under budget Project activities started in April 2009 and was completed five...

  18. Commercial Buildings Energy Consumption Survey (CBECS) - Analysis...

    Gasoline and Diesel Fuel Update (EIA)

    The Commercial Buildings Energy Consumption Survey (CBECS) project cycle spans at least ... Data collection for the 2012 Commercial Buildings Energy Consumption Survey (CBECS) took ...

  19. Better Buildings Neighborhood Program Data Installed Measures...

    Energy Savers [EERE]

    Installed Measures Better Buildings Neighborhood Program Data Installed Measures Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September ...

  20. Better Buildings Neighborhood Program Data Documentation | Department...

    Energy Savers [EERE]

    Documentation Better Buildings Neighborhood Program Data Documentation Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, ...

  1. General Building Spa | Open Energy Information

    Open Energy Info (EERE)

    Spa Jump to: navigation, search Name: General Building Spa Place: Polverigi - Ancona, Italy Zip: 60020 Product: Ancona based developer of PV projects. References: General Building...

  2. Building America Webinar: Standardized Retrofit Packages - What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Webinar: Standardized Retrofit Packages - What Works to Meet Consistent Levels of Performance? This webinar focused on specific Building America projects that ...

  3. Residential Building Analysis Tools & Support | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Analysis Tools & Support Residential Building Analysis Tools & Support Lead Performer: National Renewable Energy Laboratory (NREL) - Golden, CO Project Term: Current - ...

  4. Database Aids Building Owners and Operators in Energy-Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Database Aids Building Owners and Operators in Energy-Efficiency Project Decision Making Database Aids Building Owners and Operators in Energy-Efficiency Project Decision Making ...

  5. Department of Energy Completes Demolition of K-33 Building -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completes Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History Department of Energy Completes Demolition of K-33 Building - Largest Completed Demo Project ...

  6. Project Title: X-Ray Machine Replacement Project (4552)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB I.S - Cooling water system...

  7. City of Austin- Green Building Policy for Municipal Buildings

    Broader source: Energy.gov [DOE]

    The City Council of Austin passed a resolution (Resolution No. 000608-43) in June 2000 requiring that all future building projects be built in accordance with the standard of the U.S. Green Build...

  8. Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)

    SciTech Connect (OSTI)

    Nesse, Ronald J.; Baechler, Michael C.; Iverson, Megan M.

    2010-09-30

    In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

  9. Riverside County- Sustainable Building Policy

    Office of Energy Efficiency and Renewable Energy (EERE)

    In February 2009, the County of Riverside Board of Supervisors adopted Policy Number H-29, creating the Sustainable Building Policy. The Policy requires that all new county building projects...

  10. Building America Webinar: High Performance Building Enclosures: Part I,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Existing Homes | Department of Energy High Performance Building Enclosures: Part I, Existing Homes Building America Webinar: High Performance Building Enclosures: Part I, Existing Homes The webinar, presented on May 21, 2014, focused on specific Building America projects that have implemented technical solutions to retrofit building enclosures to reduce energy use and improve durability. Presenters answered tough questions such as: How can builders deal with increasing exterior foundation