Powered by Deep Web Technologies
Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Conceptual Design Plan SM-43 Replacement Project  

SciTech Connect

The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

University of California, Los Alamos National Laboratory, SCC Project Office

2000-11-01T23:59:59.000Z

2

Replacements Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

CRSP 2010 SUPER - - CRSP REPL SUPER PROJECT NFGCR CRSP 2011 SUPER 734,787.44 CRSP RPL SUPER PROJECT 2011 PHS C0006B 15,564.06 PHS - DSW COMM FOR OCI PHSTOW 0001B 73,885.26...

3

Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX A ENVIRONMENTAL IMPACTS METHODOLOGIES This appendix briefly describes the methods used to assess the potential direct, indirect, and cumulative effects of the alternatives in this Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory (CMRR EIS). Included are impact assessment methods for land use and visual resources, site infrastructure, air quality, noise, geology and soils, surface and groundwater, water quality, ecological resources, cultural and paleontological resources, socioeconomics, waste management and pollution prevention, and cumulative impacts. Each section includes descriptions of the affected resources, region of influence, and impact assessment methods. Descriptions of the

4

Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

o o n c e p t u a l D r a w i n g of t h e C M R R F a c i l i t y Draft Environmental Impact Statement For the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0350D May 2003 SUMMARY CMR Building TA-6 TA-55 U.S. Department of Energy National Nuclear Security Administration Los Alamos Site Office General questions regarding this EIS or for a copy of this EIS, please contact: AVAILABILITY OF THE DRAFT CMRR EIS Printed with soy ink on recycled paper Elizabeth Withers, EIS Document Manager U.S. Department of Energy Office of Los Alamos Site Operations 528 35th Street Los Alamos, New Mexico 87544-2201 Telephone: 1-877-491-4957 National Nuclear Security Administration iii COVER SHEET Responsible Agency: United States Department of Energy (DOE), National Nuclear Security

5

EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

6

DOE/EIS-0350-SA-01: Supplement Analysis for Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos, NM (01/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA-01 SA-01 Supplement Analysis Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos, New Mexico Changes to the Location of the CMRR Facility Components January 2005 Department of Energy National Nuclear Security Administration Los Alamos Site Office Supplement Analysis Introduction This Supplement Analysis (SA) has been prepared to determine if the Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory (CMRR EIS) (DOE/EIS-0350) adequately addresses the environmental effects of proposed changes in the location of certain components of the Preferred Alternative that the National Nuclear Security

7

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

8

Existing Building Commissioning (EBCx) Project Considerations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Existing Building Existing Building Commissioning (EBCx) Project Considerations Phil Welker, Executive Director PECI 2 Mapping Out Your Commissioning Strategy Three big questions: 1. Which buildings are commissioning candidates? 2. What commissioning approach(es) should I employ? 3. What expertise do I need to get it done? 3 Which buildings? Many factors come in to play: * Building sizes * Project budgets * Current energy performance * Building control systems * Occupancy rates * Operator/ engineering resources * Long term investment strategy * Sustainability plans or mandates * Equipment Replacements Selecting the right buildings is critical to achieve the maximum benefit in a cost-efficient manner. See the EPA's "A Retrocommissioning Guide for Building Owners"

9

Better Buildings Showcase Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Better Buildings Showcase Projects Better Buildings Showcase Projects Showcase projects are initial projects started within 9 months of becoming a Better Buildings Challenge...

10

Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0350)(5/15/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96 96 Federal Register / Vol. 68, No. 94 / Thursday, May 15, 2003 / Notices [FR Doc. 03-12161 Filed 5-14-03; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy, National Nuclear Security Administration. ACTION: Notice of availability and public hearings. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), and the DOE Regulations Implementing NEPA (10 CFR part 1021), the National Nuclear Security Administration (NNSA), an agency

11

Project: Intelligent Building Agents  

Science Conference Proceedings (OSTI)

... agents to achieve a common goal, such as minimizing energy consumption and ... it possible to solve the problem of building system optimization in a ...

2012-12-17T23:59:59.000Z

12

Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapters 1 through 10 Chapters 1 through 10 Appendices A through G Page Cover Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xv List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xvii Acronyms, Abbreviations, and Conversion Charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxiii 1. INTRODUCTION AND PURPOSE OF AND NEED FOR AGENCY ACTION . . . . . . . . . . . 1-1 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2 History of the CMR Building . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4 1.3 Purpose of and Need for Agency Action

13

High-Tech Buildings - Market Transformation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Tech Buildings - Market Transformation Project Title High-Tech Buildings - Market Transformation Project Publication Type Report LBNL Report Number LBNL-49112 Year of Publication...

14

Building Technologies Office: Nanolubricants Research Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanolubricants Research Nanolubricants Research Project to someone by E-mail Share Building Technologies Office: Nanolubricants Research Project on Facebook Tweet about Building Technologies Office: Nanolubricants Research Project on Twitter Bookmark Building Technologies Office: Nanolubricants Research Project on Google Bookmark Building Technologies Office: Nanolubricants Research Project on Delicious Rank Building Technologies Office: Nanolubricants Research Project on Digg Find More places to share Building Technologies Office: Nanolubricants Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research Water Heating Research Lighting Research

15

DOE Webcast - Better Buildings Workforce Guidelines Project ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Webcast - Better Buildings Workforce Guidelines Project DOE Webcast - Better Buildings Workforce Guidelines Project November 7, 2013 3:00PM EST Online https:www1.gotomeeting.com...

16

The multifamily building evaluation project  

SciTech Connect

In 1991 the New York State Energy Office embarked on a comprehensive multi-year study of multifamily housing in New York City. The principal objective of the evaluation was to determine the degree to which new windows and boiler/burner retrofits installed in 22 multifamily buildings located in the New York City region save energy and whether the savings persist over a minimum of two years. Window and boiler retrofits were selected because they are popular measures and are frequently implemented with assistance from government and utility energy programs. Approaches prospectively, energy consumption monitoring and a series of on-site inspections helped explain why energy savings exceeded or fell short of expectations. In 1993, the scope of the evaluation expanded to include the monitoring of domestic hot water (DHW) consumption in order to better understand the sizing of combined heating/DHW boilers and water consumption patterns. The evaluation was one of ten proposals selected from over 100 candidates in a nationwide competition for a US Department of Energy Building Efficiency Program Grant. The Energy Office managed the project, analyzed the data and prepared the reports, Lawrence Berkeley Laboratory served as technical advisor, and EME Group (New York City) installed meters and dataloggers, collected data, and inspected the retrofits. The New York State Energy Research and Development Authority collaborated with the Energy Office on the DHW monitoring component. Results did not always follow predictable patterns. Some buildings far exceeded energy saving estimates while others experienced an increase in consumption. Persistence patterns were mixed. Some buildings showed a steady decline in energy savings while others demonstrated a continual improvement. A clear advantage of the research design was a frequent ability to explain results.

1995-03-01T23:59:59.000Z

17

Project materials [Commercial High Performance Buildings Project  

Science Conference Proceedings (OSTI)

The Consortium for High Performance Buildings (ChiPB) is an outgrowth of DOE'S Commercial Whole Buildings Roadmapping initiatives. It is a team-driven public/private partnership that seeks to enable and demonstrate the benefit of buildings that are designed, built and operated to be energy efficient, environmentally sustainable, superior quality, and cost effective.

None

2001-01-01T23:59:59.000Z

18

Project: Whole Building Energy Modeling and Measurements  

Science Conference Proceedings (OSTI)

... buildings use approximately 22% of the total energy consumed in the US The objective of this project is to increase the energy efficiency of the ...

2012-12-27T23:59:59.000Z

19

Milling Machine Replacement Project (4587), 5/11/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milling Machine Replacement Projects (4587) Milling Machine Replacement Projects (4587) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital network communication (DNC) system. Categorical Exclusion(s) Applied: 81.31 -Installation or relocation of machinery and equipment For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation)

20

Duct Chase Sprinkler Replacement Project (4594), 5/31/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duct Chase Sprinkler Replacement Project (4594) Duct Chase Sprinkler Replacement Project (4594) Program or Field Office: Y-12 Site Office Location(s) (Citv/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is provide replacement of corroded and aged sprinkler heads in the plenum duct chases. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project: Safety of Building Occupants  

Science Conference Proceedings (OSTI)

... focuses on multiple aspects of life safety, including fundamentals of human ... to evacuate a building by stairs (using SFPE Handbook movement on ...

2013-01-02T23:59:59.000Z

22

Categorical Exclusion 4567, MPLE Test Stand Replacement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.Forn1 .Forn1 Project Title: MPLE Test Stand Replacement Project (4567) Oak Ridge Tennessee This work scope is upgrade and replace equipment with a new high-pressure leak testing capability. General AdministrationlManagement DA 1 - Routine business actions DA2 - Administrative contract amendments DA4 Interpretations/rulings for existing regulations DA5 - Regulatory interpretations without environmental effect DA6 Procedural rulemakings upgrade DA7 - Transfer of property, use unchanged DA8 - Award of technical supportlM&O/personal service contracts DA9 - Info gathering, analysis, documentation, dissemination, and training DA I 0 - Reports on non-DOE legislation DAII Technical advice and planning assistance construction/operation/decommissioning DA 12 -

23

Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project  

Science Conference Proceedings (OSTI)

CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-04T23:59:59.000Z

24

Building Technologies Office: Vacuum Insulation Panels Research Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacuum Insulation Vacuum Insulation Panels Research Project to someone by E-mail Share Building Technologies Office: Vacuum Insulation Panels Research Project on Facebook Tweet about Building Technologies Office: Vacuum Insulation Panels Research Project on Twitter Bookmark Building Technologies Office: Vacuum Insulation Panels Research Project on Google Bookmark Building Technologies Office: Vacuum Insulation Panels Research Project on Delicious Rank Building Technologies Office: Vacuum Insulation Panels Research Project on Digg Find More places to share Building Technologies Office: Vacuum Insulation Panels Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research

25

Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report  

SciTech Connect

Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

Morris, R.

1996-05-01T23:59:59.000Z

26

Build A Recreation Center Using Geometry Project  

NLE Websites -- All DOE Office Websites (Extended Search)

BUILD A RECREATION CENTER USING GEOMETRY BUILD A RECREATION CENTER USING GEOMETRY Project Description The city of West Chicago has recently acquired a small island on a nearby lake. The island is roughly circular with a radius of approximately two acres. Our geometry class is being asked to design a recreation center for the children of West Chicago. Our class has a very unique opportunity. Because of an anonymous donor, money is no object. The class will be divided into groups of approximately four students. The first task of each group is to decide which portion of the project your group will be responsible for designing. Below are your possible choices. Possible Topics Architecture Landscape Architecture Computer Games Bridges Art Other Finished Product Following is what your team is responsible for turning in at the end of the

27

Energy Department Launches Better Buildings Workforce Guidelines Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Better Buildings Workforce Guidelines Better Buildings Workforce Guidelines Project Energy Department Launches Better Buildings Workforce Guidelines Project September 26, 2013 - 2:38pm Addthis The Energy Department today announced the Better Buildings Workforce Guidelines project to improve the quality and consistency of commercial building workforce training and certification programs for five key energy-related jobs: Energy Auditor, Commissioning Professional, Building/Stationary Engineer, Facility Manager, and Energy Manager. These voluntary workforce guidelines will support the Better Buildings Initiative goal of making commercial buildings 20% more energy efficient over the next 10 years, while helping businesses and communities save money by saving energy and creating new clean energy jobs across the country.

28

Building Technologies Office: Recovery Act-Funded Working Fluid Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Fluid Projects to someone by E-mail Working Fluid Projects to someone by E-mail Share Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Facebook Tweet about Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Twitter Bookmark Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Google Bookmark Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Delicious Rank Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Digg Find More places to share Building Technologies Office: Recovery Act-Funded Working Fluid Projects on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research

29

Building Technologies Office: Recovery Act-Funded HVAC Research Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

HVAC Research Projects to someone by E-mail HVAC Research Projects to someone by E-mail Share Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Facebook Tweet about Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Twitter Bookmark Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Google Bookmark Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Delicious Rank Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Digg Find More places to share Building Technologies Office: Recovery Act-Funded HVAC Research Projects on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research

30

Ready to Retrofit: The Process of Project Team Selection, Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Ready to Retrofit: The Process of Project Team Selection, Building Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Title Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Publication Type Report LBNL Report Number LBNL-5893E Year of Publication 2012 Authors Sanders, Mark D., Kristen Parrish, and Paul A. Mathew Publisher LBNL Abstract This guide provides an introduction and overview to the retrofit process and then dives deeper into the key activities that an owner can influence most in the retrofit process: (1) Selecting Your Project Team, (2) Benchmarking Your Building, and (3) Financing Your Energy Efficiency Projects* Building Energy Retrofit Overview will provide you a simple explanation of the retrofit process, the project stages and the players involved.

31

Design-Build Project Delivery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design-Build Project Delivery Design-Build Project Delivery Design-Build Project Delivery October 16, 2013 - 4:46pm Addthis Renewable energy must be integrated into each of the design phases. Noting that any agency may have specific processes during the development of a construction project, this section discusses key issues in the following phases of the design-build process: Planning and Programming Request for Qualifications Request for Proposal Construction Contract Design and Build Integrating renewable energy into design-bid-build strategy involves a few different approaches, which are covered in the main building design section of this guide. Planning and Programming The planning and programming phase should look the same regardless of whether the project is design-bid-build or design-build. An early team is

32

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

33

Developing a total replacement cost index for suburban office projects  

E-Print Network (OSTI)

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

34

Building Technologies Office: Cold Climate Heat Pump Research Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Cold Climate Heat Pump Cold Climate Heat Pump Research Project to someone by E-mail Share Building Technologies Office: Cold Climate Heat Pump Research Project on Facebook Tweet about Building Technologies Office: Cold Climate Heat Pump Research Project on Twitter Bookmark Building Technologies Office: Cold Climate Heat Pump Research Project on Google Bookmark Building Technologies Office: Cold Climate Heat Pump Research Project on Delicious Rank Building Technologies Office: Cold Climate Heat Pump Research Project on Digg Find More places to share Building Technologies Office: Cold Climate Heat Pump Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research

35

Cybernetic Building Systems Programs and Projects  

Science Conference Proceedings (OSTI)

... Achieving national goals of net zero energy buildings requires substantial reduction in the energy consumption of commercial building systems. ...

2010-05-24T23:59:59.000Z

36

Project: Metrics and Tools for Sustainable Building Project  

Science Conference Proceedings (OSTI)

... measurements for prototypical buildings will then be adjusted to reflect a range of improvements in building energy efficiency, enabling assessment ...

2013-07-29T23:59:59.000Z

37

PROJECT: LOM 437 Interior Build Out  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT: PROJECT: LOM 437 Interior Build Out - LOCATION: 9700 South Cass Avenue Lemont, IL 60439 M T W T F S S M T W T F S S M T W T F S S 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Trinidad Litgen West Elsdon Trinidad Hill/Ahern x x x x x x McCauley x x x x x McCauley x x x x x McCauley x x x x x x x x x x x x x x West Elsdon x x x x x x x x Trinidad x x Trinidad D&M x x McCauley x x x x x x x McCauley x x x x x x x West Elsdon x x x x x x x Trinidad x x x x x D&M x x Trinidad x x x x x West Elsdon x x x x West Elsdon x x x x Trinidad x x x Frame hallway walls in pentagons A, B, D & E Install duct work in pentagons D & E Install piping in pentagons D & E Rough in electrical for floor boxes Complete Install insulation in Pentagons D&E Complete Complete Commets SUBCONTRACTOR Relocated sprinkler line for mechanical rough in Pentagons A & B DESCRIPTION OF WORK Above ceiling electrical in Pentagons D & E

38

Super Building Insulation by CO2 Foaming Process Research Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emerging Technologies » Super Building Insulation by CO2 Foaming Emerging Technologies » Super Building Insulation by CO2 Foaming Process Research Project Super Building Insulation by CO2 Foaming Process Research Project The Department of Energy is currently researching the development of building superinsulation through a carbon dioxide (CO2) foaming process. Project Description This project seeks to develop building super insulation through a carbon dioxide foaming process that does not use hydrofluorocarbons (HFCs), and which produces insulation with a high R-value. Project Partners Research is being undertaken between the Department of Energy and The Industrial Science & Technology Network. Project Goals The goal of this project is to develop advanced insulation without HFC, and to achieve a competitive processing cost for CO2 foaming technology.

39

Systems in Commercial Buildings" Project Rick Diamond, Craig...  

NLE Websites -- All DOE Office Websites (Extended Search)

the PIER "Thermal Distribution Systems in Commercial Buildings" Project Rick Diamond, Craig Wray, Brian Smith, Darryl Dickerhoff, Nance Matson, and Skylar Cox Indoor Environment...

40

The TEAM Project: Who is building the TEAM microscope?  

NLE Websites -- All DOE Office Websites (Extended Search)

Who is building the TEAM microscope? Led by Lawrence Berkeley National Laboratory's National Center for Electron Microscopy, TEAM is an intensive collaborative project with...

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE Commercial Building Partnership Program - LBNL Project Introductio...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program - LBNL Project Introductions (Includes brief update on Commercial Buildings User Facility & other items) NOTICE Due to the current lapse of federal funding, Berkeley...

42

Christopher Wagner, Buildings Project Manager Diana Lin, Buildings...  

NLE Websites -- All DOE Office Websites (Extended Search)

for First Statewide Building Energy Code Supported by SEO...9 Arizona: Utilities and SEO Promote Training and Adoption in Home Rule State......

43

Capacity Building Project with Howard University | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Capacity Building Project with Howard University Capacity Building Project with Howard University Capacity Building Project with Howard University The purpose of this initiative is to build community capacity for public participation in environmental and energy decision making. The target communities are those impacted by U.S. Department of Energy (DOE) facilities and in Washington, DC, the DOE Headquarters host community. The primary focus is on environmental justice communities-low-income and minority communities. Capacity Building Project with Howard University More Documents & Publications National Conference of Black Mayors, Inc. Capacity Building Project with Howard University The State of Environmental Justice in America 2010 Conference Environmental Justice at the U.S. Department of Energy - A Decade of

44

Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration August 2007 Final Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject - August 2007 i TABLE OF CONTENTS List of Acronyms and Abbreviations............................................................................................. vi Chemicals and Units of Measure ................................................................................................. ix Conversion Chart ......................................................................................................................... xi Metric Prefixes .............................................................................................................................xii

45

High-tech buildings - Market transformation project  

E-Print Network (OSTI)

buildings program. Perform market research and benchmark energybuilding owners, operators, and designers to compare energy use for a given cleanroom to others, it is necessary to benchmark

Applications Team

2001-01-01T23:59:59.000Z

46

Building Envelope and HVAC FOA Selection Projects  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

cold climate commercial heat pump system. The system will reduce annual electricity use for commercial building space heating in cold climates by at least 25 percent....

47

The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radioactive Liquid Waste Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (Los Alamos) is a Government- owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. Los Alamos' primary responsibility is to

48

City of Austin - Green Building Requirement for City Projects | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin - Green Building Requirement for City Projects Austin - Green Building Requirement for City Projects City of Austin - Green Building Requirement for City Projects < Back Eligibility Local Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Water Heating Wind Program Info State Texas Program Type Energy Standards for Public Buildings Provider Austin Energy The City Council of Austin passed a resolution ([http://www.cityofaustin.org/edims/document.cfm?id=59126 City Council Resolution No. 000608-43]) in June 2000 requiring that all future building projects be built in accordance with the standard of the Leadership in

49

Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring  

SciTech Connect

The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15 to 25 percent.

Dentz, J.; Henderson, H.

2012-04-01T23:59:59.000Z

50

Colorado State Capitol Building Geothermal Program Geothermal Project |  

Open Energy Info (EERE)

State Capitol Building Geothermal Program Geothermal Project State Capitol Building Geothermal Program Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Colorado State Capitol Building Geothermal Program Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 1: Technology Demonstration Projects Project Description This building is approximately 100 years old, and much of the building is heated with expensive district steam and lacks sufficient central cooling. The requested funding pertains to Topic Area 1 Technology Demonstration Projects. Funding would be used for Phase I - Feasibility Study and Engineering Design, Phase II - Installation and Commissioning of Equipment, and Phase III - Operation, Data Collection, and Marketing. Geothermal energy provided by an open-loop ground source heat pump system and upgrades to the building HVAC systems will reduce consumption of electricity and utility steam created with natural gas. Additionally, comfort, operations and maintenance, and air quality will be improved as a result. It is anticipated that the open loop GHP system will require a 500-650 gpm water flow rate.

51

Commercial Building Energy Efficiency Education Project  

SciTech Connect

The primary objective of this grant is to educate the public about carbon emissions and the energy-saving and job-related benefits of commercial building energy efficiency. investments in Illinois.

None

2013-01-13T23:59:59.000Z

52

Commercial Building Partnerships: Partners and Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Energy Alliances Building Energy Alliances August 1, 2011 Bank of America * Punta Gorda, FL * Multiple Locations Best Buy Co., Inc. * Lakewood, CO * To Be Determined CB Richard Ellis Group, Inc. / Fitzmartin Consulting * Denver, CO Clark Atlanta University * Center for Alternative, Renewable Energy, Technology and Training Defense Commissary Agency (DeCA) * Lackland Air Force Base Forest City Enterprises, Inc. * Forest City-Richmond, VA Grand Valley State University * Library * Seidman Center Hines (Morgan Stanley property owner)

53

High Performance Building Facade Solutions: PIER Final Project Report  

NLE Websites -- All DOE Office Websites (Extended Search)

High Performance Building Facade Solutions: PIER Final Project Report High Performance Building Facade Solutions: PIER Final Project Report Title High Performance Building Facade Solutions: PIER Final Project Report Publication Type Report LBNL Report Number LBNL-4583E Year of Publication 2009 Authors Lee, Eleanor S., Stephen E. Selkowitz, Dennis L. DiBartolomeo, Joseph H. Klems, Robert D. Clear, Kyle Konis, Robert J. Hitchcock, Mehry Yazdanian, Robin Mitchell, and Maria Konstantoglou Date Published 12/2009 Abstract Building façades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. façades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.

54

Building America Top Innovations 2013 Profile … Window Replacement, Rehabilitation, & Repair Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

are also discussed. are also discussed. Water infiltration is dealt with at considerable length because windows are one of the likeliest components in the building structure for water entry and because water intrusion and resultant damage may have gone on unnoticed for some time as water can enter the wall cavity through and around the window assembly. Suggestions for investigating sources of water intrusion are provided. The condition of the decorative trim around the window can be an indication of water damage but deterioration of the trim is typically an aesthetic problem not a performance problem. However, if the window sill is damaged, it should be replaced because it is the means by which water will drain out away from the house or, incorrectly, into the wall. Damaged or deteriorating window sashes, frames, or casings

55

Building America Top Innovations 2013 Profile … Window Replacement, Rehabilitation, & Repair Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

such as working on scaffolding are also discussed. such as working on scaffolding are also discussed. Water infiltration is dealt with at considerable length because windows are one of the likeliest components in the building structure for water entry and because water intrusion and resultant damage may have gone on unnoticed for some time as water can enter the wall cavity through and around the window assembly. Suggestions for investigating sources of water intrusion are provided. The condition of the decorative trim around the window can be an indication of water damage but deterioration of the trim is typically an aesthetic problem not a performance problem. However, if the window sill is damaged, it should be replaced because it is the means by which water will drain out away from the house or,

56

Project: Measures of Building Resilience and Structural ...  

Science Conference Proceedings (OSTI)

... of structural behavior under various local failure scenarios. ... The project will consider scenario-based events ... basis for cost/benefit analysis of design ...

2013-01-02T23:59:59.000Z

57

Better Buildings Showcase Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPEN 2012 Projects Clean Cities Coalition Regions Clean Cities Coalition Regions Google Crisis Map for Hurricane Sandy Google Crisis Map for Hurricane Sandy Alternative...

58

High-tech buildings - Market transformation project  

SciTech Connect

Facility managers and designers know their buildings are energy intensive yet have few techniques to quantify cleanroom energy performance. Benchmarking identifies the energy end uses in a cleanroom. As expected, besides the process loads, which are often very intense, the mechanical systems are the most energy intensive in these buildings. Benchmarking the mechanical systems and components can provide useful information on system and component performance and provide a basis to identify energy-saving opportunities in cleanrooms. HVAC systems in cleanrooms are dramatically different from their counterparts in commercial buildings in terms of reliability, safety requirements, and scale. The design of cleanroom HVAC systems is a specialty area requiring unique understanding of cleanliness guidelines, airflow quantities, room pressurization, code requirements, specialty equipment, tight control, and many more details. The HVAC systems must also operate reliably and safely. Since recirculation air systems use large amounts of fan power in moving large amounts of conditioned air through HEPA filters, the cleanroom, and return pathways they represent one of the largest energy end uses in a cleanroom. In addition, many processes requiring cleanrooms also have large make-up and exhaust airflow needs requiring huge amounts of energy to move and condition the displaced air. Energy intensity for mechanical systems in cleanrooms ranges between 4 to 100 times that of commercial buildings. There is, however, a lack of comparative data on the performance of cleanroom mechanical systems. To better understand existing cleanroom systems in high technology industries, and to better enable building owners, operators, and designers to compare energy use for a given cleanroom to others, it is necessary to benchmark energy performance in such facilities.

Applications Team

2001-10-01T23:59:59.000Z

59

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

60

Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pipe System Sprinkler Piping Replacement Projects (4588) Pipe System Sprinkler Piping Replacement Projects (4588) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace sections of dry pipe system sprinkler piping which include heads, hangers, fittings, and valves. Categorical Exclusion(s) Applied: 81.3- Routine maintenance For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part I 021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Project Closeout: Guidance for Final Evaluation of Building America Communities  

Science Conference Proceedings (OSTI)

This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

Norton, P.; Burch, J.; Hendron, B.

2008-03-01T23:59:59.000Z

62

DOE passive solar commercial buildings program: project summaries  

DOE Green Energy (OSTI)

The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

Not Available

1982-01-01T23:59:59.000Z

63

Going Big: Building the Largest Ever Energy Efficiency Project | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project August 16, 2012 - 2:19pm Addthis New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to serve 8,000 Northwest homes. Construction of the chip pretreatment structure, shown here, is scheduled to be completed in 2013. | Photo courtesy of Bonneville Power Administration. New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to

64

Going Big: Building the Largest Ever Energy Efficiency Project | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project August 16, 2012 - 2:19pm Addthis New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to serve 8,000 Northwest homes. Construction of the chip pretreatment structure, shown here, is scheduled to be completed in 2013. | Photo courtesy of Bonneville Power Administration. New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to

65

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites  

SciTech Connect

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.

2012-10-31T23:59:59.000Z

66

Project team : Daylighting The New York Times Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Project team Project team Overview The architectural approach The owner's approach Daylighting field study Daylighting control systems Automated roller shades Procurement specifications Shades and Shade Controls Lighting Controls Visualizing daylight Commissioning/ verification Demand response Mainstream solutions Post-occupancy evaluation Publications Sponsors Project team Project team To contact the following individuals, please call the number listed or enable JavaScript within your browser's preferences. The New York Times Company Angelo Salvatore Executive Director of Building Operations Patrick Whelan Facilities Director Glenn Hughes Director of Construction/ Real Estate David Thurm Chief Information Officer Hussain Ali-Khan Vice President, Real Estate Development

67

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

68

The Building Codes Assistance Project (BCAP) | Open Energy Information  

Open Energy Info (EERE)

The Building Codes Assistance Project (BCAP) The Building Codes Assistance Project (BCAP) Jump to: navigation, search BCAP was established in 1994 as a joint initiative of the Alliance to Save Energy, the American Council for an Energy-Efficient Economy, and the Natural Resources Defense Council. BCAP provides custom-tailored assistance on building energy code adoption and implementation. We assist state and local regulatory and legislative bodies and help coordinate others representing environmental interests, consumers, labor, and industry. BCAP provides states with code advocacy assistance on behalf of the U.S. Department of Energy and coordinates with DOE on technical assistance (see www.energycodes.gov for more information). In addition, BCAP receives funding from multiple foundations, the U.S. EPA,

69

Investigation of Cooling and Dehumidification Energy Use and Indoor Thermal Conditions in Polk County Schools Permanent Replacement Classroom Buildings  

E-Print Network (OSTI)

Increasing enrollment in grades K-12 coupled with the spiraling costs of construction has pushed school boards to develop more cost-effective classrooms, from the perspective of initial cost, longterm energy consumption, and ease of maintenance. To this end, the Florida's Polk County School Board has developed a four-quad permanent replacement classroom building. Each classroom is equipped with a package terminal heat pump (PTHP) with a thermostat control with a four-hour crank timer. The objective of this research was to compare the energy consumption and interior conditions of the autoclaved aerated concrete (AAC) construction with an unvented roof assembly to that of the conventional metal framing and concrete panel buildings. Four buildings, 2 metal-framed and 2 AAC buildings with dehumidifiers were chosen for extensive testing and monitoring. The goal was to maintain a relative humidity of 50% as well as an interior temperature of 75oF.

Moyer, N. A.; Cummings, J. B.; Chasar, D.

2002-01-01T23:59:59.000Z

70

STIL2 Swedish Office Buildings Survey The STIL2 project has performed...  

Open Energy Info (EERE)

Office Buildings Survey The STIL2 project has performed a survey of high performance office buildings in Sweden to provide energy efficiency data for non-residential...

71

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects  

Science Conference Proceedings (OSTI)

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

Richman, Eric E.

2009-11-04T23:59:59.000Z

72

SRS Waste Solidification Building Project Peer Review, July 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS-2011-07-15 SRS-2011-07-15 Site: Savannah River Site, NA-26 Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Waste Solidification Building Project Peer Review Dates of Activity : 07/12/2011 - 07/15/2011 Report Preparer: James Lockridge Activity Description/Purpose: At the request of the National Nuclear Security Administration (NNSA) Office of Enterprise Project Management (NA- APM-20), the Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), provided an expert to review the Waste Solidification Building (WSB) startup programs and procedures associated with worker safety and health, environment, and security. Criteria for the review was detailed in the Criteria,

73

RESULTS FROM RFETS BUILDING 771 PROJECT Activity Name Driver  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RESULTS FROM RFETS BUILDING 771 PROJECT RESULTS FROM RFETS BUILDING 771 PROJECT Activity Name Driver Pre Review M-H/Yr Post Review Est M-H/Yr Est Potential Reallocable M-H/Yr Savings Est Cost Savings @$50/Hr Pre Review Frequency Suggested Frequency Bin Location Resource Organization Contamination survey in/around Gloveboxes not in use None 364 0 364 $18,200 Semi- annually N/A Cancellati on Radiation Protection Contamination Survey upon receipt of rad materials None 0 0 0 $0 As required N/A Cancellati on Radiation Protection A/S - Posting areas with potential > 10% DAC 10CFR835 2080 0 2080 $104,000 As required N/A Cancellati on Radiation Protection A/S - Use of respirators where potential for > 10% DAC 10CFR835 RCM Art 555 2080 0 2080 $104,000 As required N/A Cancellati on Radiation

74

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

75

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project  

Science Conference Proceedings (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

76

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project  

Science Conference Proceedings (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

77

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project  

Science Conference Proceedings (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

78

Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project, April 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project May 2011 April 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project Table of Contents 1. Introduction ........................................................................................................................................... 1 2. Scope and Methodology ....................................................................................................................... 2

79

Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements  

SciTech Connect

In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the references used for this document.

KLEM, M.J.

2000-10-18T23:59:59.000Z

80

Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring  

SciTech Connect

The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. of Cambridge, Massachusetts, to implement and study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating control systems in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded.

Dentz, J.; Henderson, H.; Varshney, K.

2013-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Commercial Buildings Partnership Projects - Metered Data Format and Delivery  

Science Conference Proceedings (OSTI)

A number of the Commercial Building Partnership Projects (CBPs) will require metering, monitoring, data analysis and verification of savings after the retrofits are complete. Although monitoring and verification (M&V) agents are free to use any metering and monitoring devices that they chose, the data they collect should be reported to Pacific Northwest National Laboratory (PNNL) in a standard format. PNNL will store the data collected in its CBP database for further use by PNNL and U.S. Department of Energy. This document describes the data storage process and the deliver format of the data from the M&V agents.

Katipamula, Srinivas

2010-11-16T23:59:59.000Z

82

Building Energy Software Tools Directory : Tariff Analysis Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Tariff Analysis Project Back to Tool Screenshot for Tariff Analysis Project. Screenshot for Tariff Analysis Project...

83

Project Plan 7930 Cell G PaR Remote Handling System Replacement  

Science Conference Proceedings (OSTI)

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

Kinney, Kathryn A [ORNL

2009-10-01T23:59:59.000Z

84

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 March 2009 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment DOE/EA-1636 Bonneville Power Administration March 2009 Bonneville Power Administration i Table of Contents Chapter 1 Need for and Purpose of Action ............................................................... 1-1 1.1 Introduction .....................................................................................................

85

High Performance Building Facade Solutions PIER Final Project Report  

E-Print Network (OSTI)

Window blinds as a potential energysaver - A case study (NBS Building Science Series 112). Washington, DC:

Lee, Eleanor

2011-01-01T23:59:59.000Z

86

Rohm and Haas: Furnace Replacement Project Saves Energy and Improves Production at a Chemical Plant  

Science Conference Proceedings (OSTI)

This DOE Industrial Technologies Program spotlight describes how Rohm and Haas's Deer Park, Texas, chemical plant reduced natural gas usage and energy costs by replacing inefficient furnace equipment.

Not Available

2006-02-01T23:59:59.000Z

87

HE Machining Complex and Support Buildings Deactivation and Decommissioning Project at the Pantex Plant  

Science Conference Proceedings (OSTI)

This paper describes the issues related to the deactivation and decommissioning of a very unique building at the Department of Energy's Pantex Plant located in Amarillo, TX. Building 12-24 was unique in the fact that it had a number of obstacles that have not been previously addressed in the deactivation and decommissioning of a single structure such as asbestos, beryllium, possible radionuclide contamination, lead paint, heavily reinforced concrete walls, and high explosive (HE) contamination inside and out. To date, the building has been razed and the majority of all equipment has been disposed of. Remaining work includes concrete and soil debris removal, earthen barricade removal, and site leveling. Pantex Site Summary: Pantex Plant is America's only nuclear weapons assembly and disassembly facility. Located on the High Plains of the Texas Panhandle, 17 miles northeast of Amarillo, Pantex is centered on a 16,000-acre site just north of U. S. Highway 60 in Carson County. The Pantex Plant industrial operations are conducted for the DOE by a management and operating contractor (BWXT Pantex), and Sandia National Laboratory. DOE owns approximately 9,100 acres at the Pantex Plant. Just over 2,000 acres of the DOE-owned property are used for industrial operations at Pantex Plant excluding the burning ground, firing sites and other outlying areas. The burning ground and firing sites occupy approximately 489 acres. Remaining DOE-owned land serves DOE safety and security purposes. DOE also owns Pantex Lake, a detached piece of property approximately 4 km (2.5 mi) northeast of the main Plant site that comprises 1,077 acres; the playa lake-bed itself occupying approximately 800 acres. Currently no government industrial operations are conducted at the Pantex Lake property. Seventy-six kilometers (47 mi) of roads exist within the Pantex Plant boundaries. Project Summary: Facilities are deactivated and decommissioned (D and D) when there is no longer a mission for them or they have been replaced by other facilities. D and D is a series of actions that bring a facility from its condition and status at the time operations ceased, to demolition or conversion to another use. The structures associated with the High Explosive (HE) Machining Complex (HEMC) had been removed from service and selected for demolition. The Department of Energy has implemented a 'One up, One down' policy in which older, unusable buildings must be removed prior to the construction of new facilities. This concept ensures that the footprint of the DOE complex does not increase; therefore, reducing current maintenance costs in addition to reducing the backlog of deferred maintenance. This specific project included the demolition of 5 buildings, 3 ramps, 2 shade structures, 6 building slab remains, solvent transfer area structure, and overhead steam condensate and structure. Demolition work included removal of tanks, piping and utilities; asbestos abatement; decontamination of equipment; and revegetation of disturbed areas. The objectives of the project were to decontaminate and remove buildings, tanks, etc., and return the site to a natural state. This project involved three primary tasks: - Deactivate and re-route utilities; - Decontaminate and remove contaminated and non-contaminated equipment; - Demolish buildings and ramps, and remove slabs and footings. (authors)

Lyles, C. [Department of Energy, Amarillo, TX (United States); Conner, M. [BWXT Pantex, Amarillo, TX (United States)

2007-07-01T23:59:59.000Z

88

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Edinburg Irrigation District Hidalgo County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along the "Curry Main" and multi-size pipeline replacing a segment of delivery canal along the "North Branch / East Main"). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $29.87 per ac-ft and energy savings are measured at an aggregate value of $0.0000595 per BTU (i.e., $0.203 per kwh). In addition, expected values are indicated for the Bureau of Reclamation's three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $50.90 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0000777 per BTU ($0.265 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.01.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-11-01T23:59:59.000Z

89

High Performance Building Facade Solutions PIER Final Project Report  

SciTech Connect

Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and the US.A collaborative test, monitoring, and reporting protocol was also formulated via the Windows Testbed Facility in collaboration with industry partners, transitioning industry to focus on the importance of expecting measured performance to consistently achieve design performance expectations. The facility enables accurate quantification of energy use, peak demand, and occupant comfort impacts of synergistic facade-lighting-HVAC systems on an apples-to-apples comparative basis and its data can be used to verify results from simulations. Emerging interior and exterior shading technologies were investigated as potential near-term, low-cost solutions with potential broad applicability in both new and retrofit construction. Commercially-available and prototype technologies were developed, tested, and evaluated. Full-scale, monitored field tests were conducted over solstice-to-solstice periods to thoroughly evaluate the technologies, uncover potential risks associated with an unknown, and quantify performance benefits. Exterior shading systems were found to yield net zero energy levels of performance in a sunny climate and significant reductions in summer peak demand. Automated interior shading systems were found to yield significant daylighting and comfort-related benefits.In support of an integrated design process, a PC-based commercial fenestration (COMFEN) software package, based on EnergyPlus, was developed that enables architects and engineers to quickly assess and compare the performance of innovative facade technologies in the early sketch or schematic design phase. This tool is publicly available for free and will continue to improve in terms of features and accuracy. Other work was conducted to develop simulation tools to model the performance of any arbitrary complex fenestration system such as common Venetian blinds, fabric roller shades as well as more exotic innovative facade systems such as optical louver systems.

Lee, Eleanor; Selkowitz, Stephen

2009-12-31T23:59:59.000Z

90

Development of whole-building energy performance models as benchmarks for retrofit projects  

Science Conference Proceedings (OSTI)

This paper presents a systematic development process of whole-building energy models as performance benchmarks for retrofit projects. Statistical regression-based models and computational performance models are being used for retrofit projects in industry ...

Omer Tugrul Karaguzel; Khee Poh Lam

2011-12-01T23:59:59.000Z

91

Southeast Enertgy Efficiency Alliance's Building Energy Codes Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SEEA's Building Energy Codes SEEA's Building Energy Codes Program Jenah Zweig Southeast Energy Efficiency Alliance (SEEA) jzweig@seealliance.org, 404-602-9663 April 2, 2013 Significant energy efficiency advancements are underway in the Southeast 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: The Southeast needs targeted energy codes adoption, implementation and compliance support Step 3: Compliance Step 2: Implementation Step 1: Adoption 3 | Building Technologies Office eere.energy.gov

92

Southeast Enertgy Efficiency Alliance's Building Energy Codes Project  

NLE Websites -- All DOE Office Websites (Extended Search)

SEEA's Building Energy Codes SEEA's Building Energy Codes Program Jenah Zweig Southeast Energy Efficiency Alliance (SEEA) jzweig@seealliance.org, 404-602-9663 April 2, 2013 Significant energy efficiency advancements are underway in the Southeast 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: The Southeast needs targeted energy codes adoption, implementation and compliance support Step 3: Compliance Step 2: Implementation Step 1: Adoption 3 | Building Technologies Office eere.energy.gov

93

Project: Contaminant Control in High-Performance Buildings  

Science Conference Proceedings (OSTI)

... Specifically, the use of building materials with low VOC emissions may allow energy savings by lowering outdoor air ventilation requirements. ...

2013-01-15T23:59:59.000Z

94

HVAC equipment replacement for best size and efficiency  

DOE Green Energy (OSTI)

The purpose of this project was to explore the potential benefits of HVAC equipment replacement for buildings owned by the City of Phoenix. The specific research objectives were as follows: Establishment an understanding of the magnitude and sources of saving available through equipment replacement; Establish an economic model for understanding equipment replacement and deciding when equipment should be replaced; Establish technical methods for calculating savings from replacement of various types of equipment; Demonstrate the replacement of a major item of HVAC equipment and document the savings through actual experimentation and measurement; and Provide guidance material for other jurisdictions wishing to investigate equipment replacement. 11 figs., 9 tabs.

Teji, D.S.

1988-02-01T23:59:59.000Z

95

Bayesian Belief Network (BBN)-based advisory system development for steam generator replacement project management  

E-Print Network (OSTI)

The growing need for improved project management technique points to the usefulness of a knowledge-base advisory system to help project managers understand current and future project status and optimize decisions based ...

Kim, Dohyoung, 1970-

2002-01-01T23:59:59.000Z

96

High Performance Building Facade Solutions PIER Final Project Report  

E-Print Network (OSTI)

of energy use, peak demand, and occupant comfort impacts ofreductions in summer peak demand. Automated interior shadingenergy efficiency, peak demand, visual comfort, buildings, x

Lee, Eleanor

2011-01-01T23:59:59.000Z

97

Building Energy Software Tools Directory: Tariff Analysis Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Tariff Analysis Project Tariff Analysis Project logo. There are many software solutions that determine the energy savings due to some new technology, but virtually no solutions...

98

HPS replacement project drives garage costs down. [High-pressure sodium luminaires  

SciTech Connect

The high cost of energy had forced a four-story New York airport parking garage to turn off almost half its low bay lights, leaving it gloomy and vandal-prone. By replacing the original lamps with high-pressure sodium (HPS) luminaires, the garage brightened its image with 2400 fewer fixtures and netted an annual energy savings of $60,000.

Not Available

1985-09-01T23:59:59.000Z

99

Functional Suitability of BIM Tools in Pre-Construction, Construction and Post-Construction Phases of a Building Project  

Science Conference Proceedings (OSTI)

Managing building projects and communication of information between the stakeholders of the projects is getting collaborative and faster, with the availability of Building Information Modelling BIM software system. Numerous BIM systems are offered by ...

Vijaya Desai

2013-04-01T23:59:59.000Z

100

Results from RFETS Building 771 Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(RBSM) Review Process was first performed on a pilot basis at Building 771 at the Rocky Flats Environmental Technology Site (RFETS). The purpose of this pilot was to test the...

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

102

Project title: Natural ventilation, solar heating and integrated low-energy building design  

E-Print Network (OSTI)

of integrated low-energy building design. In Cambridge, research was conducted at the BP Institute - which was set up in 1999 with an endowment from BP to research some of the fundamental scientific challenges that the oil industry encounters. In the CMI... in building design. Summary of Intended Outcomes: The objectives of the project will be to develop designs and technologies to: reduce energy costs of maintaining a comfortable environment with buildings through use of solar power, natural ventilation...

2009-07-10T23:59:59.000Z

103

Breaking down barriers, building up communities : implementing project labor agreements with targeted hiring goals  

E-Print Network (OSTI)

For decades, government and community organizations have developed strategies to provide workers historically excluded from the Building Trades with access to jobs on publicly funded construction projects. Studies of best ...

Chimienti, Elizabeth Ann

2010-01-01T23:59:59.000Z

104

An expert system for strategic control of accidents and insurers' risks in building construction projects  

Science Conference Proceedings (OSTI)

Building construction projects appear to have higher accident rates. Contractors procure workers' compensation insurance (WCI) to transfer these risks to insurance companies. The commitment of insurers under WCI is extremely broad; there are no exclusions ... Keywords: Buildings, Expert system, Fuzzy logic, Occupational health and safety, Singapore, Workers' compensation insurance

Kamardeen Imriyas

2009-03-01T23:59:59.000Z

105

Do-It-Now building maintenance reengineering project  

Science Conference Proceedings (OSTI)

The Do-It-Now (DIN) building maintenance system is proposed to reduce the cost of routine building maintenance and repairs and to improve customer satisfaction with maintenance services. DIN uses a team approach to periodically inspect buildings and provide maintenance services on the spot. It emphasizes communications between the customers and the craftspeople performing the work. The system was designed using a reengineering approach that characterized the existing maintenance work control system, analyzed comparable systems in other DOE laboratories, envisioned an ideal system, and proposed a workable, testable system for initial implementation. At each stage, input was solicited from customer representatives and Facilities management to ensure meeting customer requirements with an implementable system.

Apoddaca, L.; Ayotte, A.; Coffman, J.; Dukes, L.; Jojola, S.; Kadlec, J.; Letourneau, S.; Matthews, R.; Paul, G.

1996-09-01T23:59:59.000Z

106

Finding Money for Your Energy Efficiency Projects | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Finding Money for Your Energy Efficiency Projects Finding Money for Your Energy Efficiency Projects Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories

107

Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 93 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy Oak Ridge Y-12 Site Office National Nuclear Security Administration August 2007 DOE/EA-1593 Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration

108

Improving the environmental performance of a small-scale industrial building project  

Science Conference Proceedings (OSTI)

An investor-owned utility built three line crew centers to meet the requirements of its environmentally oriented new construction DSM program. The new locations are distributed around a region to replace a large central facility. Each facility includes an office building, a garage area, a warehouse, covered parking, and a fueling station. The office buildings were designed to use 43% less energy than if constructed according to Oregon code minimum. The facility as a whole uses resource-efficient building products. A quality indoor environment is achieved through the use of low toxicity building materials. Environmental responsibility was demonstrated by using water-efficient fixtures, recycling of construction materials and creating a bioswale, or retention pond, to receive runoff water. One site also includes 2.8 acres of wetland creation and enhancement where habitat was created for the northern red-legged frog, which has been designated as a species of concern.

Peterson, J.C.; Good, N.L.; Parr, R.W.; Nicolay, R.D.; Millican, R.

1999-07-01T23:59:59.000Z

109

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

DOE Green Energy (OSTI)

Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

110

ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits  

SciTech Connect

The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

Loewen, J.M.; Levine, M.D.; Busch, J.F. [eds.

1992-06-01T23:59:59.000Z

111

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

SciTech Connect

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the Citys hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the Citys Project Engineer, who had overseen the application, resigned and left the Citys employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

112

Building Technologies Office: R&D Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

R&D Projects R&D Projects DOE leadership and support spur advances in the efficacy and performance of light-emitting diode (LED) and organic LED (OLED) technologies-advances that might not otherwise be achieved without DOE funding. (Some of the following documents are available as Adobe Acrobat PDFs. Download Adobe Reader.) The three-pronged DOE SSL R&D program addresses: Core Technology Research, focusing on applied research for technology development, with particular emphasis on meeting efficiency, performance, and cost targets. This research fills technology gaps to overcome technical barriers, and is subject to the Exceptional Circumstances Determination regarding intellectual property. Product Development, using the knowledge gained from basic or applied research to develop or improve commercially viable materials, devices, or systems.

113

City of Santa Monica - Building Permit Fee Waiver for Solar Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » City of Santa Monica - Building Permit Fee Waiver for Solar Projects City of Santa Monica - Building Permit Fee Waiver for Solar Projects < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Green Building Incentive Provider City of Santa Monica In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff from the Solar Santa Monica office, the city released their [http://www.solarsantamonica.com/documents/PVSubmittalRequirement2010.pdf

114

Design and prototype of a partial window replacement to improve the energy efficiency of 90-year-old MIT buildings  

E-Print Network (OSTI)

The existing windows of the 90-year-old buildings on the main MIT campus are not energy efficient and compromise comfort levels. The single panes of glass allow too much heat transfer and solar heat gain. In addition, the ...

Chen, YunJa

2007-01-01T23:59:59.000Z

115

Over the energy edge: Results from a seven year new commercial buildings research and demonstration project  

SciTech Connect

Edge was a research oriented demonstration project that began in 1985. Twenty-eight commercial buildings were designed and constructed to use 30% less electricity than a hypothetical simulated baseline building. Average savings from the 18 buildings evaluated with post-occupancy, ``tuned`` simulation models were less, at 17%. The cost-effectiveness of the energy-efficiency measures at six of the 18 projects met the target cost-of-conserved (CCE) energy of 5.6cent/kWh for the total package of measures. The most important reason energy savings were not as great as predicted is that the actual, installed energy-efficiency measures and building characteristics changed from the design assumptions. The cost effectiveness of the measures would have been greater if the baseline was common practice rather than assumptions based on the regional building code. For example, the Energy Edge small offices use about 30% to 50% less energy than comparable new buildings. Savings also would have been greater if commissioning had been included within the program. Future projects should consider lower-cost ``hands-on`` evaluation techniques that provide direct feedback on measure performance based on functional and diagnostic testing, with annual check-ups to ensure persistence of savings.

Piette, M.A.; Nordman, B.; deBuen, O.; Diamond, R. [Lawrence Berkeley Lab., CA (United States); Codey, B. [Bonneville Power Administration, Portland, OR (United States)

1994-08-01T23:59:59.000Z

116

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District 72" and 54" Pipeline Replacing Main Canal Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Brownsville Irrigation District to the North American Development Bank (NADB) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the Main Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,844 ac-ft of water per year and 313,797,977 BTUs (91,969 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $24.70 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0001740 per BTU ($0.594 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $56.74 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0003335 per BTU ($1.138 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -1.46.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-07-01T23:59:59.000Z

117

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District 72" and 48" Pipeline Replacing Main Canal Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Brownsville Irrigation District to the North American Development Bank (NADB) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 48" pipeline to replace 2.31 miles of the Main Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,872 ac-ft of water per year and 318,479,103 BTUs (93,341 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $27.98 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0001933 per BTU ($0.660 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $58.60 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0003444 per BTU ($1.175 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -1.53.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-10-01T23:59:59.000Z

118

Seismic Safety Margins Research Program (Phase I). Project IV. Structural building response; Structural Building Response Review  

Science Conference Proceedings (OSTI)

As part of the Phase I effort of the Seismic Safety Margins Research Program (SSMRP) being performed by the University of California Lawrence Livermore Laboratory for the US Nuclear Regulatory Commission, the basic objective of Subtask IV.1 (Structural Building Response Review) is to review and summarize current methods and data pertaining to seismic response calculations particularly as they relate to the objectives of the SSMRP. This material forms one component in the development of the overall computational methodology involving state of the art computations including explicit consideration of uncertainty and aimed at ultimately deriving estimates of the probability of radioactive releases due to seismic effects on nuclear power plant facilities.

Healey, J.J.; Wu, S.T.; Murga, M.

1980-02-01T23:59:59.000Z

119

Exploring project collaboration systems in the building industry  

E-Print Network (OSTI)

The use of Web-Based-Collaboration-Systems (WBCS) continues to grow as part of information technology development in the Architecture-Engineering-Construction (AEC) industry. WBCS provide different media channels to support collaboration across geographical distributed teams. However, many companies are still hesitant to integrate WBCS. This research provides an understanding of how WBCS are used in practice. Most distinctively, it obtained practice data from several major US architecture firms and examined about 30,000 transactions produced during actual design and planning projects as practicing architects, engineers and consultants used WBCS. The study investigated what information was used and exchanged among participants during the different design stages. This was related to the different media channels of WBCS. The raw project data has been coded and transformed into secondary data through computer-supported content analysis. Based upon categories from previous literature, such as communication, coordination and design theories, the data has been analyzed for sender, receiver, channel and content of information transmitted. The content has been characterized into work tasks, information handling behavior and design activities. Additional interviews with industry professionals produced information that had not been documented through WBCS and that corroborated the analytical findings. The combination of theory, quantitative, and qualitative analysis has been synthesized into a portrait of WBCS usage that was validated through triangulation. The analysis of digital records of design communication from practice through content analysis is a new research methodology in AEC. The evidence supporting design methods theory shows the changes in tasks and information handling in regards to the project phases. It indicates that the most frequent loops of design activity are Evaluation- Analysis-Synthesis and Evaluation-Synthesis-Evaluation. It documents the actual usage of WBCS based on descriptive statistics and Markov models. WBCS was used primarily as a document repository and calendaring tool. The remote team members used it more frequently than centrally located participants. The study shows the limitations of WBCS: none of the verbal communication was captured. More significant, the entire email exchange took place outside the WBCS. WBCS was used very extensively, if the implementation of the system supported the organizational structure and vice versa.

Laepple, Eberhard Sebastian

2005-08-01T23:59:59.000Z

120

LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL  

Science Conference Proceedings (OSTI)

5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

P.C. Weaver

2010-10-22T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Energy Department Announces New Projects to Improve Energy Efficiency in Buildings  

Energy.gov (U.S. Department of Energy (DOE))

As part of the Obama Administration's efforts to reduce energy bills for American families and businesses and reduce greenhouse gas emissions, the Energy Department today announced 12 projects to develop innovative heating, cooling, and insulation technologies as well as open source energy efficiency software to help homes and commercial buildings save energy and money. These projects will receive an approximately $11 million Energy Department investment, matched by about $1 million in private sector funding.

122

Final Project Report for DPD, Inc. Office Building in Lansing, Michigan  

DOE Green Energy (OSTI)

The National Renewable Energy Laboratory participated with DPD, Inc., in the thermal analysis of buildings constructed using concrete with recycled materials in the aggregate. This project was part of a Phase II Small Business Innovative Research grant to determine how the thermal properties of concrete can be''tuned'' for use in passive solar buildings. DPD Inc. and Michigan State University developed techniques to alter the thermal properties of concrete by introducing recycled materials into the aggregate. Two office/retail buildings were built in Lansing, Michigan for this research. The objective of NREL's involvement was to evaluate the effects of concrete thermal properties on the building performance through energy simulations and monitoring. This report presents a summary of work accomplished on this project, including a predesign analysis of the concrete properties and building designs as well as energy performance analysis after construction. The test results were used to calibrate computer models that were later used to predict long-term performance of the buildings.

Deru, M.; Sherman, M.

2003-03-01T23:59:59.000Z

123

Efficiency Projects for Office and Education Buildings Integrating Indoor Environmental Quality with Energy Efficiency  

E-Print Network (OSTI)

Purpose and Scope of this Report Many building owners and managers are under increased pressure from many circles to provide good indoor environmental quality (IEQ). There are many opportunities to advance IEQ during the course of energy projects without sacrificing energy efficiency. These opportunities

Integrating Indoor; Environmental Quality; Office Of Radiation; Indoor Air

2000-01-01T23:59:59.000Z

124

Implementing Solar PV Projects on Historic Buildings and in Historic Districts  

DOE Green Energy (OSTI)

Many municipalities, particularly in older communities of the United States, have a large amount of historic buildings and districts. In addition to preserving these historic assets, many municipalities have goals or legislative requirements to procure a certain amount of energy from renewable sources and to become more efficient in their energy use; often, these requirements do not exempt historic buildings. This paper details findings from a workshop held in Denver, Colorado, in June 2010 that brought together stakeholders from both the solar and historic preservation industries. Based on these findings, this paper identifies challenges and recommends solutions for developing solar photovoltaic (PV) projects on historic buildings and in historic districts in such a way as to not affect the characteristics that make a building eligible for historic status.

Kandt, A.; Hotchkiss, E.; Walker, A.; Buddenborg, J; Lindberg, J.

2011-09-01T23:59:59.000Z

125

US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-08-01T23:59:59.000Z

126

Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects  

E-Print Network (OSTI)

Abstract: While it is widely recognized that additional costs due to rework can have an adverse effect on project performance, limited empirical research has been done to investigate the influencing factors. The research presented in this paper aims to determine the influence of different project types and procurement methods on rework costs in construction projects. Using a questionnaire survey, rework costs were obtained from 161 Australian construction projects. The direct and indirect consequences of rework are analyzed and discussed. It is shown that, contrary to expectation, rework costs do not differ relative to project type or procurement method. In addition, it was found rework contributed to 52 % of a projects cost growth and that 26 % of the variance in cost growth was attributable to changes due to direct rework. To reduce rework costs and therefore improve project performance, it is posited that construction organizations begin to consider and measure them, so that an understanding of their magnitude can be captured, root causes identified, and effective prevention strategies implemented.

Peter E. D. Love

2002-01-01T23:59:59.000Z

127

Make the Most of Your Financed Energy Project The energy engineers on ORNL's Commercial Buildings team are experts  

E-Print Network (OSTI)

Make the Most of Your Financed Energy Project The energy engineers on ORNL's Commercial Buildings to build a successful energy project. Energy savings performance contracts (ESPCs) and other financing mechanisms can deliver infrastructure improvements and reduce energy and maintenance costs, with no up

128

Building Technologies Office: Integrated Building Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Building Integrated Building Management System Research Project to someone by E-mail Share Building Technologies Office: Integrated Building Management System Research Project on Facebook Tweet about Building Technologies Office: Integrated Building Management System Research Project on Twitter Bookmark Building Technologies Office: Integrated Building Management System Research Project on Google Bookmark Building Technologies Office: Integrated Building Management System Research Project on Delicious Rank Building Technologies Office: Integrated Building Management System Research Project on Digg Find More places to share Building Technologies Office: Integrated Building Management System Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

129

ACT{sup 2} project report: Ventilation and air tightness measurement of the Sunset Building  

Science Conference Proceedings (OSTI)

This report presents the results of ventilation and air tightness measurements made on the test section of the Sunset Building as part of the ACT{sup 2} project. Real-time measurements were made over a two-week period in July 1991 to determine the building`s performance; most of the results derive from intensive measurements made during (unoccupied) weekend periods. The ventilation rate of the entire building was measured to be about 2 air changes per hour of outdoor air which exceeds ASHRAE Standard 62-1989 design requirements by over a factor of two. Ventilation in all specific locations was found to be adequate, except for conference rooms -- some of which were significantly under ventilated. Opportunities exist for energy savings with better control of the ventilation. Ventilation efficiency was measured for the test section and selected sub-sections as well. In order to account for interzonal and intrazonal interactions, axillary information was collected and used to adjust the data. The implications of this data may be important for future interpretation of the building`s performance.

Sherman, M.; Dickerhoff, D.

1991-10-01T23:59:59.000Z

130

High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

Not Available

1993-06-01T23:59:59.000Z

131

Manhattan Project buildings and facilities at the Hanford Site: A construction history  

Science Conference Proceedings (OSTI)

This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

Gerber, M.S.

1993-09-01T23:59:59.000Z

132

ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report  

SciTech Connect

Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

Levine, M.D.; Busch, J.F. [eds.][Lawrence Berkeley Lab., CA (United States); Deringer, J.J. [Deringer Group, Riva, MD (United States)

1992-06-01T23:59:59.000Z

133

Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)  

SciTech Connect

The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

PICKETT, W.W.

2000-09-22T23:59:59.000Z

134

Daylighting design analysis. Project status report No. 2, 1 March-31 December 1980. [For pre-engineered metal buildings  

DOE Green Energy (OSTI)

Detailed scale model studies regarding daylighting aspects of the passive/hybrid solar test building located at Butler Research Center in Grandview, MO are discussed. The product development program is aimed at providing passive/hybrid system building alternatives for commercial, industrial, and community purchasers of Butler's Landmark pre-engineered metal buildings. Occasioned by recognition, early in the project, that daylighting could strongly influence annual energy consumption in buildings of the targetted use types, scale models of several alternative design configurations, including that of the test building in Grandview, were built and tested. The major design alternatives, test results, and conclusions to date are described.

Hallagan, W.B.; Lindsey, L.L.; Snyder, M.K.

1980-01-01T23:59:59.000Z

135

Manhattan Project: A Tentative Decision to Build the Bomb<!--Include title  

Office of Scientific and Technical Information (OSTI)

President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB Washington, D.C.(1941-1942) Events > Early Government Support, 1939-1942 Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 Vannevar Bush moved swiftly to take advantage of the positive MAUD Report. Without waiting for Arthur Compton's latest committee to finish its work confirming the MAUD Committee's conclusions, Bush on October 9, 1941, met with President Franklin D. Roosevelt and Vice President Henry A. Wallace (who had been briefed on uranium research in July). Bush summarized the British findings, discussed cost and duration of a bomb project, and emphasized the uncertainty of the situation. He also received the President's permission to explore construction needs with the Army. Roosevelt instructed him to move as quickly as possible but not to go beyond research and development. Bush, then, was to find out if a bomb could be built and at what cost but not to proceed to the production stage without further presidential authorization. Roosevelt indicated that he could find a way to finance the project and asked Bush to draft a letter so that the British government could be approached "at the top.

136

Buildings  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) advances building energy performance through the development and promotion of efficient, affordable, and high impact technologies, systems, and practices. The...

137

Building to Grid (B2G) (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

to Grid (B2G) (Smart Grid Project) to Grid (B2G) (Smart Grid Project) Jump to: navigation, search Project Name Building to Grid (B2G) Country Austria Headquarters Location Salzburg, Austria Coordinates 47.80949°, 13.05501° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.80949,"lon":13.05501,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

138

ACT sup 2 project report: Ventilation and air tightness measurement of the Sunset Building  

Science Conference Proceedings (OSTI)

This report presents the results of ventilation and air tightness measurements made on the test section of the Sunset Building as part of the ACT{sup 2} project. Real-time measurements were made over a two-week period in July 1991 to determine the building's performance; most of the results derive from intensive measurements made during (unoccupied) weekend periods. The ventilation rate of the entire building was measured to be about 2 air changes per hour of outdoor air which exceeds ASHRAE Standard 62-1989 design requirements by over a factor of two. Ventilation in all specific locations was found to be adequate, except for conference rooms -- some of which were significantly under ventilated. Opportunities exist for energy savings with better control of the ventilation. Ventilation efficiency was measured for the test section and selected sub-sections as well. In order to account for interzonal and intrazonal interactions, axillary information was collected and used to adjust the data. The implications of this data may be important for future interpretation of the building's performance.

Sherman, M.; Dickerhoff, D.

1991-10-01T23:59:59.000Z

139

US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Krabacher, J.E.

1996-08-01T23:59:59.000Z

140

Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed reactor system at Building 9212. Draft environmental assessment  

SciTech Connect

The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is Iocated within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The current AHF supply and fluidized-bed reactor systems were designed and constructed more than 40 years ago. Because of their deteriorating condition, the corrosive nature of the materials processed, and the antiquated design philosophy upon which they are based, their long-term reliability cannot be assured. The current AHF supply system cannot mitigate an accidental release of AHF and vents fugitive AHF directly to the atmosphere during operations. the proposed action would reduce the risk of exposing the Y-12 Plant work force, the public, and the environment to an accidental release of AHF and would ensure the continuing ability of the Y-12 Plant to manufacture highly enriched uranium metal and process uranium from retired weapons for storage.

1995-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)  

Science Conference Proceedings (OSTI)

The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be tracked as part of the CSB Facility action tracking system.

BAZINET, G.D.

2000-11-03T23:59:59.000Z

142

FINAL REPORT INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS  

Science Conference Proceedings (OSTI)

ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

ERIKA N. BAILEY

2012-02-29T23:59:59.000Z

143

Summary of UTMB O&M Project: Energy Conservation Potential in Five Buildings  

E-Print Network (OSTI)

This report is a summary of five reports (references 1 to 5) which provided detailed descriptions of an O&M investigation of the following five buildings on the UTMB campus: 1) John Sealy North Building(JSN); 2) Clinical Science Building(CSB); 3) Basic Science Building(BSB); 4)Moody Library Building(MLB); and 5) John Sealy South Building(JSS). In these five buildings, the soft tune up is the major O&M measure identified. This report briefly describes the buildings, summarizes the methodology used and the O&M measures identified for each building, presents simulated energy savings, measured savings and conclusions.

Liu, M.; Athar, A.; Reddy, T. A.; Claridge, D. E.; Haberl, J. S.

1993-01-01T23:59:59.000Z

144

Microsoft Word - CX-TroutdaleWindowReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Eric Weekley Project Manager - NWM-4 Proposed Action: Replace existing steel windows at the Troutdale Substation control house PP&A Project No.: PP&A-1699 Budget Information: Work Order No. 242796 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities and custodial services for buildings, structures, ... Location: Bonneville Power Administration's (BPA) Troutdale Substation located in Troutdale, Oregon Proposed by: BPA Description of the Proposed Action: BPA proposes to replace the deteriorating existing steel windows at the Troutdale Substation control house with new, in-kind steel windows.

145

ASEAN--USAID Buildings Energy Conservation Project final report. Volume 2, Technology  

SciTech Connect

This volume reports on research in the area of energy conservation technology applied to commercial buildings in the Association of Southeast Asian Nations (ASEAN) region. Unlike Volume I of this series, this volume is a compilation of original technical papers prepared by different authors in the project. In this regard, this volume is much like a technical journal. The papers that follow report on research conducted by both US and ASEAN researchers. The authors representing Indonesia, Malaysia, Philippines, and Thailand, come from a range of positions in the energy arena, including government energy agencies, electric utilities, and universities. As such, they account for a wide range of perspectives on energy problems and the role that technology can play in solving them. This volume is about using energy more intelligently. In some cases, the effort is towards the use of more advanced technologies, such as low-emittance coatings on window glass, thermal energy storage, or cogeneration. In others, the emphasis is towards reclaiming traditional techniques for rendering energy services, but in new contexts such as lighting office buildings with natural light, or cooling buildings of all types with natural ventilation. Used in its broadest sense, the term ``technology`` encompasses all of the topics addressed in this volume. Along with the more customary associations of technology, such as advanced materials and equipment and the analysis of their performance, this volume treats design concepts and techniques, analysis of ``secondary`` impacts from applying technologies (i.e., unintended impacts, or impacts on parties not directly involved in the purchase and use of the technology), and the collection of primary data used for conducting technical analyses.

Levine, M.D.; Busch, J.F. [eds.

1992-06-01T23:59:59.000Z

146

Controlling Beryllium Contaminated Material And Equipment For The Building 9201-5 Legacy Material Disposition Project  

SciTech Connect

This position paper addresses the management of beryllium contamination on legacy waste. The goal of the beryllium management program is to protect human health and the environment by preventing the release of beryllium through controlling surface contamination. Studies have shown by controlling beryllium surface contamination, potential airborne contamination is reduced or eliminated. Although there are areas in Building 9201-5 that are contaminated with radioactive materials and mercury, only beryllium contamination is addressed in this management plan. The overall goal of this initiative is the compliant packaging and disposal of beryllium waste from the 9201-5 Legacy Material Removal (LMR) Project to ensure that beryllium surface contamination and any potential airborne release of beryllium is controlled to levels as low as practicable in accordance with 10 CFR 850.25.

Reynolds, T. D.; Easterling, S. D.

2010-10-01T23:59:59.000Z

147

City of Scottsdale Courts Building solar space-conditioning project. Final technical report  

DOE Green Energy (OSTI)

The Maricopa County Courts Building is an existing 6800 square foot, single story structure housing offices and courtroom space. The solar system is sized to provide 65% of the annual cooling load and 100% of the heating load. An adjacent city swimming pool is connected to the system as a heat sink to provide thermal overload protection. A 25-ton absorption chiller is piped in series with the existing 25-ton air-cooled packaged chiller. Heating will be by standard hot water duct coils mounted upstream of the existing electric heaters. Freeze control is by recirculation under normal conditions, and by flush through in the event of power failure. The control sequence is given and the acceptance tests are described. Problems and solutions in constructing the system and lessons learned are discussed. Appended are the solar system schematic and as-built drawings, as well as photographs of the completed project. (LEW)

Not Available

1981-06-01T23:59:59.000Z

148

Solar project description for Hei Wai Wong multi-dwelling building, Honolulu, Hawaii  

SciTech Connect

The Hei Wai Wong site is a 4-story, 55 unit apartment building in Honolulu, Hawaii. Three solar systems are installed at this project to supplement the domestic hot water (DHW) requirements, and include preheating the laundry hot water for average usage rate. The solar energy system collector-to-storage results from thermosyphoning. The flat plate collector array has a gross area of 3,002 sq ft of which 807.4 square feet is instrumented. The collectors are facing south with a collector tilt of 24/sup 0/. Collected energy is accumulated in the 1230 gallon water tank that is roof top mounted. Such preheated water can be gravity fed to the laundry and apartment units. Auxiliary heating of the hot water in each apartment is provided by 30 gallon tanks using electric resistance heat elements. Auxiliary heating of the hot water in the laundry is provided by an 85 gallon tank fired by natural gas.

1979-10-01T23:59:59.000Z

149

Investigation of Project Management Planning Practices for Renovation of Historical Buildings in Urban Contexts Located in Texas  

E-Print Network (OSTI)

This study investigated the relationship between Project Management Planning (PMP) practices and project success for preservation projects of historical significance located in an urban context. The planning for these projects was also emphasized because these historic buildings are recognized by the National Register of Historic Places. Yet, when analyzing the performance metrics of these historically significant renovation projects that included budget and time after the project has been completed denote problems in the management and delivery of these projects. The project team members' perceptions of PMP practices and how these practices affect project success were the focus of this research. To ascertain the importance of these questions, the study incorporated three major bodies of knowledge. The first body of literature focused on project management practices associated with project success. The second concentrated on historic preservation with a focus on historic significance and project planning. The third body centered on facility management as it relates to project management issues in the delivery of a construction project. Combining these bodies of knowledge into one literature review contributed to the development of a conceptual model to illustrate how the research variables and hypotheses were established. To test the research questions and its hypothesis, three statistical tools were used: analysis of variance (ANOVA), descriptive data analysis, and ordinary least square regression. The conclusions from these tests indicated that differences in perceptions of success criteria existed between the project team members. The findings also indicated a significant disconnect between the perceptions of project success and actual performance of project delivery. Furthermore, the findings indicated that only a few project management practices tested were perceived to have significant correlation with project success. The project team members felt that the success criteria of performance and the success factors associated with performance -- site analysis, site layout and staging, and a quality assurance plan -- were more important to the success of the renovation project than many of the management practices in this study.

Escamilla, Edelmiro

2011-05-01T23:59:59.000Z

150

Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings  

Science Conference Proceedings (OSTI)

Small and medium commercial customers in California make up about 20-25% of electric peak load in California. With the roll out of smart meters to this customer group, which enable granular measurement of electricity consumption, the investor-owned utilities will offer dynamic prices as default tariffs by the end of 2011. Pacific Gas and Electric Company, which successfully deployed Automated Demand Response (AutoDR) Programs to its large commercial and industrial customers, started investigating the same infrastructures application to the small and medium commercial customers. This project aims to identify available technologies suitable for automating demand response for small-medium commercial buildings; to validate the extent to which that technology does what it claims to be able to do; and determine the extent to which customers find the technology useful for DR purpose. Ten sites, enabled by eight vendors, participated in at least four test AutoDR events per site in the summer of 2010. The results showed that while existing technology can reliably receive OpenADR signals and translate them into pre-programmed response strategies, it is likely that better levels of load sheds could be obtained than what is reported here if better understanding of the building systems were developed and the DR response strategies had been carefully designed and optimized for each site.

Page, Janie; Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann; Chiu, Albert K.; Kellow, Bashar; Koch, Ed; Lipkin, Paul

2011-07-01T23:59:59.000Z

151

Plant Process Computer Replacement to Support Distributed Process Control: Joint STPNOC-EPRI Distributed Plant Process Computer Syst em Project  

Science Conference Proceedings (OSTI)

Concerns exist that nuclear power plant process computer systems are becoming obsolete and do not have the infrastructure to support new processes such as digital process control upgrades. To address these concerns, a distributed plant process computer system was designed and implemented at the South Texas Project Nuclear Operating Company Units 1 and 2. Implementing this new system and its associated plant networks, if done correctly, will facilitate future control and information system upgrades that c...

2001-11-16T23:59:59.000Z

152

Implementing Solar Photovoltaic Projects on Historic Buildings and in Historic Districts  

SciTech Connect

Despite a global recession, the number of photovoltaic (PV) installations in the United States grew 30% from 2008 to 2009. A number of trends point toward continued growth of new PV installations. The efficiency of solar panels is increasing, while installation costs are going down. At the same time, federal, state, and local regulations are requiring that greater amounts of energy must come from renewable sources. Incentives for solar power technology implementation are being created and regulatory barriers removed. Corporations and governments are focusing on solar power to demonstrate leadership in environmental sustainability and resource conservation. Architects and builders are including PV arrays as a way to meet green building standards and property owners are seeking PV as a way to reduce their utility bills, as well as their carbon footprints. This publication focuses on the implementation of PV systems on historic properties. Many private property owners, as well as local, state, and national government entities, are seeking guidance on how best to integrate solar PV installations on historic buildings. Historic preservationists maintain that preserving, reusing, and maintaining historic structures is a key sustainable design strategy while also recognizing the importance of accommodating renewable energy technologies where they are appropriate. In some cases, however, conflicts have arisen over the installation of PV panels on historic properties. Addressing these conflicts and providing guidance regarding solutions and best practices is an important step toward resolving or eliminating barriers. Historic properties and districts in the United States provide tangible connections to the nation's past. Thousands of buildings, sites, districts, structures, and objects have been recognized for their historic and architectural significance. Local, state, and national designations of historic properties provide recognition, protection, and incentives that help to preserve those properties for future generations. At the national level, the National Register of Historic Places includes more than 86,000 listings, which encompass a total of more than 1.6 million historic resources. State registers of historic places also provide recognition and protection for historic sites and districts. Locally, more than 2,400 communities have established historic preservation ordinances. Typically implemented through zoning overlays, these local land use regulations manage changes to hundreds of thousands of historic properties. Over a period of 2 years (2007 and 2008) the U.S. Department of Energy (DOE) designated 25 major U.S. cities as Solar America Cities. DOE provided financial and technical assistance to help the cities develop comprehensive approaches to accelerate the adoption of solar energy technologies. The Solar America Cities partnerships represent the foundation of DOE's larger Solar America Communities program. As a part of this program, DOE identified the implementation of solar projects on historic properties and in historic districts as one area to address. A workshop titled 'Implementing Solar Projects on Historic Buildings and in Historic Districts' was held in Denver, Colorado, in June of 2010. Participants included representatives from the solar industry as well as historic preservationists from nonprofit organizations and government agencies at the local, state, and national levels. The workshop provided an opportunity to gain a common understanding of solar technologies and historic preservation procedures and priorities. The workshop participants also discussed some of the challenges involved in locating PV systems on historic properties and identified potential solutions. This publication is based on the discussions that occurred at this workshop and the recommendations that were developed by participants. Ideas expressed by participants in the workshop, and included in this document, do not necessarily reflect the opinion of any government council, agency, or entity.

Kandt, A.; Hotchkiss, E.; Walker, A.

2011-01-01T23:59:59.000Z

153

Federal Energy Management Program technical assistance case study: The Forrestal Building relighting project saves $400K annually  

SciTech Connect

The US Department of Energy (DOE) believes energy efficiency begins at home -- in this case the James A. Forrestal Building in Washington, D.C. Since 1969, the 1.7 million-square-foot Forrestal Building has served as DOE Headquarters. In 1989, a team of in-house energy specialists began searching for opportunities to make the Forrestal Building more energy efficient. The team, on which personnel from the Federal Energy Management Program (FEMP) served, identified lighting as an area in which energy use could be reduced substantially. A monitoring program showed that the building`s more than 34,000 1-foot by 4-foot fluorescent lighting fixtures were responsible for 33% of the building`s total annual electric energy use, which represents more than 9 million kilowatt-hours (kWh) per year. In initiating the relighting program, DOE hoped to achieve these broad goals: Reduce energy use and utility bills, and improve lighting quality by distributing the light more uniformly. Funding was also an important consideration. DOE sought financing alternatives through which the lighting retrofit is paid for without using government-appropriated capital funds. DOE cut lighting costs more than 50% and paid for the project with the money saved on energy bills.

1997-01-01T23:59:59.000Z

154

Building Technologies Office: Integrated Whole-Building Energy Diagnostics  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Integrated Whole-Building Energy Diagnostics Research Project to someone by E-mail Share Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Facebook Tweet about Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Twitter Bookmark Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Google Bookmark Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Delicious Rank Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Digg Find More places to share Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on AddThis.com...

155

Fort Irwin integrated resource assessment. Volume 3: Sitewide Energy Project identification for buildings and facilities  

SciTech Connect

The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.

Keller, J.M.; Dittmer, A.L.; Elliott, D.B.; McMordie, K.L.; Richman, E.E.; Stucky, D.J.; Wahlstrom, R.R.; Hadley, D.L.

1995-02-01T23:59:59.000Z

156

France gets nuclear fusion plant France will get to host the project to build a 10bn-euro (6.6bn) nuclear fusion reactor, in  

E-Print Network (OSTI)

the construction costs will be shouldered by the EU. "We believe that the Iter project should start as soon energy programme in 1959. ITER - NUCLEAR FUSION PROJECT Project estimated to cost 10bn euros and will runFrance gets nuclear fusion plant France will get to host the project to build a 10bn-euro (£6.6bn

157

Statewide Savings Projections from the Adoption of Commercial Building Energy Codes in Illinois  

SciTech Connect

ANSI/ASHRAE/IESNA Standard 90.1-1999 Energy Standard for Buildings except Low-Rise Residential Buildings was developed in an effort to set minimum requirements for the energy efficient design and construction of new commercial buildings. A number of jurisdictions in the state of Illinois are considering adopting ASHRAE 90.1-1999 as their commercial building energy code. This report builds on the results of a previous study, "Analysis of Potential Benefits and Costs of Adopting ASHRAE Standard 90.1-1999 as a Commercial Building Energy Code in Illinois Jurisdictions," to estimate the total potential impact of adopting ASHRAE 90.1-1999 as a statewide commercial building code in terms of Life-Cycle Cost (LCC) savings, total primary energy savings, and pollution emissions reductions.

Cort, Katherine A.; Belzer, David B.

2002-09-30T23:59:59.000Z

158

Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedial action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.

Widdop, M.R.

1996-08-01T23:59:59.000Z

159

Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-07-01T23:59:59.000Z

160

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) 48" Pipeline Replacing Wisconsin Canal Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the Wisconsin Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 977 ac-ft of water per year and 372,892,700 BTUs (109,289 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $70.97 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0002124 per BTU ($0.725 per kwh). In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $75.29 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001973 per BTU ($0.673 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.12.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the Wisconsin Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 977 ac-ft of water per year and 372,892,700 BTUs (109,289 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $70.97 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0002124 per BTU ($0.725 per kwh). In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $75.29 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001973 per BTU ($0.673 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.12.

Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

2003-07-01T23:59:59.000Z

162

324 Building Compliance Project: Selection and evaluation of alternatives for the removal of solid remote-handled mixed wastes from the 324 Building  

Science Conference Proceedings (OSTI)

Six alternatives for the interim storage of remote-handled mixed wastes from the 324 Building on the Hanford Site have been identified and evaluated. The alternatives focus on the interim storage facility and include use of existing facilities in the 200 Area, the construction of new facilities, and the vitrification of the wastes within the 324 Building to remove the majority of the wastes from under RCRA regulations. The six alternatives are summarized in Table S.1, which identifies the primary facilities to be utilized, the anticipated schedule for removal of the wastes, the costs of the transfer from 324 Building to the interim storage facility (including any capital costs), and an initial risk comparison of the alternatives. A recently negotiated Tri-Party Agreement (TPA) change requires the last of the mixed wastes to be removed by May 1999. The ability to use an existing facility reduces the costs since it eliminates the need for new capital construction. The basic regulatory approvals for the storage of mixed wastes are in place for the PUREX facility, but the Form HI permit will need some minor modifications since the 324 Building wastes have some additional characteristic waste codes and the current permit limits storage of wastes to those from the facility itself. Regulatory reviews have indicated that it will be best to use the tunnels to store the wastes. The PUREX alternatives will only provide storage for about 65% of the wastes. This results from the current schedule of the B-Cell Clean Out Project, which projects that dispersible debris will continue to be collected in small quantities until the year 2000. The remaining fraction of the wastes will then be stored in another facility. Central Waste Complex (CWC) is currently proposed for that residual waste storage; however, other options may also be available.

Ross, W.A.; Bierschbach, M.C.; Dukelow, J.S. Jr. [and others

1995-06-01T23:59:59.000Z

163

Listening to Customers: How Deliberative Polling Helped Build 1,000 MW of New Renewable Energy Projects in Texas  

NLE Websites -- All DOE Office Websites (Extended Search)

3 * NREL/TP-620-33177 3 * NREL/TP-620-33177 Listening to Customers: How Deliberative Polling Helped Build 1,000 MW of New Renewable Energy Projects in Texas R.L. Lehr Attorney W. Guild, Ph.D. The Guild Group, Inc. D.L. Thomas, Ph.D. Dennis Thomas and Associates B.G. Swezey National Renewable Energy Laboratory National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * Battelle * Bechtel Contract No. DE-AC36-99-GO10337 June 2003 * NREL/TP-620-33177 Listening to Customers: How Deliberative Polling Helped Build 1,000 MW of New Renewable Energy Projects in Texas R.L. Lehr Attorney W. Guild, Ph.D. The Guild Group, Inc. D.L. Thomas, Ph.D. Dennis Thomas and Associates

164

HAZWOPER project documents for demolition of the Waste Evaporator Facility, Building 3506, at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

This document, in support of the Waste Evaporator Facility (WEF) demolition project and contains the Project Work Plan and the Project Health and Safety Plan for demolition and partial remediation actions by ATG at the Waste Evaporator Facility, Building 3506. Various activities will be conducted during the course of demolition, and this plan provides details on the work steps involved, the identification of hazards, and the health and safety practices necessary to mitigate these hazards. The objective of this document is to develop an approach for implementing demolition activities at the WEF. This approach is based on prior site characterization information and takes into account all of the known hazards at this facility. The Project Work Plan provides instructions and requirements for identified work steps that will be utilized during the performance of demolition, while the Health and Safety Plan addresses the radiological, hazardous material exposure, and industrial safety concerns that will be encountered.

NONE

1996-03-01T23:59:59.000Z

165

Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soil beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-08-01T23:59:59.000Z

166

Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Krabacher, J.E.

1996-07-01T23:59:59.000Z

167

Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-07-01T23:59:59.000Z

168

Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soil beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-07-01T23:59:59.000Z

169

Evaluation and Optimization of Underground Thermal Energy Storage Systems of Energy Efficient Buildings (WKSP)- A Project within the new German R&D- Framework EnBop  

E-Print Network (OSTI)

Until 2003 the research on buildings in operation in Germany focused mainly on demonstration buildings. Starting with the EVA project managed by IGS the attention is shifting towards performance in operation. The paper gives a general review of these research projects and presents detailed results of project WKSP. The performance of buildings with systems for underground thermal energy storage is analysed in this project. As the analyses show several systems work worse than expected. Within the project most of the systems could be significantly improved in operation. The scientific work on building performance in operation will be broadened within the new R&D framework EnBop. IGS will coordinate the framework funded by the German Ministry of Economics and Technology.

Bockelmann, F.; Kipry, H.; Plesser, S.; Fisch, M. N.

2008-10-01T23:59:59.000Z

170

Buildings characterization work plan: Weldon Spring Site Remedial Action Project: Appendix  

Science Conference Proceedings (OSTI)

The following tables and location diagrams are furnished to assist the contractor in identifying and locating known ACM and potential ACM. Each location listed on the tables and shown on the diagrams represents the presence of a major concentration of ACM. Not every location of ACM at the WSCP is listed, two buildings (108 and 403) have not been surveyed, and portions of several buildings were inaccessible. However, the tables reflect all ACM that can be identified at the site prior to the dismantling of buildings.

Not Available

1988-04-01T23:59:59.000Z

171

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

172

Building Technologies Office: Building America: Bringing Building  

NLE Websites -- All DOE Office Websites (Extended Search)

America: Bringing Building Innovations to Market America: Bringing Building Innovations to Market Building America logo The U.S. Department of Energy's (DOE) Building America program has been a source of innovations in residential building energy performance, durability, quality, affordability, and comfort for more than 15 years. This world-class research program partners with industry (including many of the top U.S. home builders) to bring cutting-edge innovations and resources to market. For example, the Solution Center provides expert building science information for building professionals looking to gain a competitive advantage by delivering high performance homes. At Building America meetings, researchers and industry partners can gather to generate new ideas for improving energy efficiency of homes. And, Building America research teams and DOE national laboratories offer the building industry specialized expertise and new insights from the latest research projects.

173

100 Area D4 Project Building Completion Report: December 2008 to December 2009  

SciTech Connect

This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009.

K.G. Finucane, J.P. Harrie

2010-10-26T23:59:59.000Z

174

Singapore's Draft Green Buildings R&D framework and BCA Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Point of Contact: Dane Lay At least 80% of the buildings in Singapore to be 'green' by 2030" - this is one of the key national targets for the built environment under the...

175

Using critical chain project management methodologies to build a production schedule  

E-Print Network (OSTI)

Critical Chain project management methodologies have been used for the last ten years to manage a wide range of projects. These methods, which apply Eli Goldratt's Theory of Constraints, have demonstrated the ability to ...

Poppe, Clayton D. (Clayton Douglas)

2009-01-01T23:59:59.000Z

176

Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1 was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-08-01T23:59:59.000Z

177

Building Technologies Office: Sensor Suitcase for Small Commercial Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Sensor Suitcase for Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project to someone by E-mail Share Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Facebook Tweet about Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Twitter Bookmark Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Google Bookmark Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Delicious Rank Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Digg

178

Commissioning Building Systems for Improved Energy ...  

Science Conference Proceedings (OSTI)

Commissioning Building Systems for Improved Energy Performance Project. Summary: NIST will advance commercial building ...

2012-12-17T23:59:59.000Z

179

300 Area D4 Project Fiscal Year 2007 Building Completion Report  

SciTech Connect

This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of twenty buildings in the 300 Area of the Hanford Site. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.

R. A. Westberg

2009-01-15T23:59:59.000Z

180

The human language project: building a Universal Corpus of the world's languages  

Science Conference Proceedings (OSTI)

We present a grand challenge to build a corpus that will include all of the world's languages, in a consistent structure that permits large-scale cross-linguistic processing, enabling the study of universal linguistics. The focal data types, bilingual ...

Steven Abney; Steven Bird

2010-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DQO Summary Report for 324 and 327 Building Hot Cells D4 Project Waste Characterization  

SciTech Connect

This data quality objective (DQO) summary report provides the results of the DQO process conducted for waste characterization activities for the 324 and 327 Building hot cells decommission, deactivate, decontaminate, and demolish activities. This DQO summary report addresses the systems and processes related to the hot cells, air locks, vaults, tanks, piping, basins, air plenums, air ducts, filters, an adjacent elements that have high dose rates, high contamination levels, and/or suspect transuranic waste, which will require nonstandard D4 techniques.

T.A. Lee

2006-02-06T23:59:59.000Z

182

300 Area D4 Project Fiscal Year 2009 Building Completion Report  

SciTech Connect

This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

B. J. Skwarek

2010-01-27T23:59:59.000Z

183

Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project  

Science Conference Proceedings (OSTI)

The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment.

Stevens, J. L.; Titus, R.; Sanford, P. C.

2002-02-26T23:59:59.000Z

184

Manhattan Project: Final Approval to Build the Bomb, Washington, D.C.,  

Office of Scientific and Technical Information (OSTI)

President Roosevelt signs declaration of war with Japan, December 8, 1941. FINAL APPROVAL TO BUILD THE BOMB President Roosevelt signs declaration of war with Japan, December 8, 1941. FINAL APPROVAL TO BUILD THE BOMB (Washington, D.C., December 1942) Events > Difficult Choices, 1942 More Uranium Research, 1942 More Piles and Plutonium, 1942 Enter the Army, 1942 Groves and the MED, 1942 Picking Horses, November 1942 Final Approval to Build the Bomb, December 1942 Anxious as he was to get moving, Leslie Groves decided to make one final quality control check. On November 18, 1942, Groves appointed Warren K. Lewis of the Massachusetts Institute of Technology to head a final review committee, comprised of himself and three DuPont representatives. During the final two weeks of November, the committee traveled from New York to Chicago to Berkeley and back again through Chicago. It endorsed the work on gaseous diffusion at Columbia, though it made some organizational recommendations; in fact, the Lewis committee advocated elevating gaseous diffusion to first priority and expressed reservations about the electromagnetic program despite an impassioned presentation by Ernest Lawrence in Berkeley. Upon returning to Chicago, Crawford H. Greenewalt, a member of the Lewis committee, was present at Stagg Field when CP-1 (Chicago Pile #1) first went critical. (For more on CP-1, skip ahead to "Early Pile Design, 1942.") Significant as this moment was in the history of physics, it came after the Lewis committee endorsed moving piles to the pilot stage and one day after Groves instructed DuPont to move into pile design and construction.

185

Home | Better Buildings Workforce  

NLE Websites -- All DOE Office Websites (Extended Search)

Better Buildings Logo Better Buildings Logo EERE Home | Programs & Offices | Consumer Information Search form Search Search Better Buildings Logo Better Buildings Workforce Home Framework Resources Projects Participate Home Framework Resources Projects Better Buildings Workforce Guidelines Buildings Re-tuning Training ANSI Energy Efficiency Standards Collaborative Energy Performance-Based Acquisition Training Participate For a detailed project overview, download the Better Buildings Workforce Guidelines Fact Sheet Home The Better Buildings Initiative is a broad, multi-strategy initiative to make commercial and industrial buildings 20% more energy efficient over the next 10 years. DOE is currently pursuing strategies across five pillars to catalyze change and accelerate private sector investment in energy

186

Green Building- Efficient Life Cycle  

E-Print Network (OSTI)

Energy saving does not just apply to traffic, production or agriculture. Buildings are also contributing to the climate change. The focus here is on the energy they use and on their CO2 emissions. Each year, Siemens invests more than two billion euros in the appropriate research and development. For customers, this means that Siemens is already providing them with energy efficient solutions that save resources and reduce emissions. Siemens Real Estate (SRE) has taken on the task of ensuring that Siemens AG will become 20 percent more energy efficient by 2011, and it has turned an efficiency program for existing real estate, which has been in existence since 2005, into an integrated green building initiative. This initiative comprises the components Sustainable Building Design, Life Cycle Cost Analysis, Green Building Certification and Natural Resources Management. These components are deliberately arranged around the life cycle of the real estate concerned. This allows a different emphasis to be placed on the different questions in each project phase and each phase of a buildings life and for them to be answered in a targeted manner. Sustainable Building Design comes into effect during the tasking and preliminary planning phase of a building project; and, by providing a specially developed sustainability manual, it helps with the definition of target values and the drawing up of efficiency strategies for the planning of the building. The manual epitomizes, and sets out clearly, the attitude of SRE to all building-specific sustainability matters. In addition, it is used in the offering of rewards for project competitions. As a result, through a selection of different energy-efficiency measures that have been roughly conceived beforehand, the primary energy consumption can already be restricted in the project definition phase. Life Cycle Cost Analysis comes into effect when the blueprint for buildings is being drawn up. Up to now, when components and systems were being chosen, the main focus was usually on the investment costs involved. By using a cost tool developed specifically to meet the needs of the company, SRE will in future be able to estimate the component-specific utilization costs such as cleaning, maintenance, and the use of energy at an early planning stage. Green Building Certification is used in building projects during the planning and implementation phase, and it thus ensures the quality of the new real estate over the long term. Siemens is implementing the Green Building Program of the European Commission in new building projects and renovation work in EU countries. In all other countries that are not taking part in the EU Green Building Program, SRE uses certification in accordance with LEED (Leadership in Energy and Environmental Design). In the LEED certification, a transparent and easy-to-use catalog of criteria is employed to make an assessment of the use of energy and other aspects of sustainability, such as the selection of the plot of land, the efficient use of water, the quality of air within buildings, and the selection of materials. This ensures that a neutral and independent assessment is made of all new building and large-scale renovation projects. The action program Natural Resources Management rounds off the range of measures in the area of existing real estate. The aim of the program is to identify and highlight all latent efficiency potential in existing buildings. This includes, for instance, modernizing the control equipment used for the heating and ventilation systems. This entails replacing electrical power units with more efficient models, and retrofitting fans and pumps with frequency converters. Sixty buildings have now been inspected, and savings of almost eight million Euros have been achieved. The average payback period is less than two years. One example of this is an old Siemens building from the 1970s at the Munich-Perlach site. Through energy optimization, it has been possible to cu

Kohns, R.

2008-10-01T23:59:59.000Z

187

Forrest County Geothermal Energy Project Geothermal Project ...  

Open Energy Info (EERE)

of replacing the existing air cooled chiller with geothermal water to water chillers for energy savings at the Forrest County Multi Purpose Center. The project will also replace...

188

RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report  

SciTech Connect

A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in the following areas: Department of Energy Order 435.1, Radioactive Waste Management, requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan Environmental assessment supporting the National Environmental Policy Act Nuclear safety Safeguards and security Emplacement operations Requirements for commissioning General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.

Annette L. Schafer

2012-06-01T23:59:59.000Z

189

Building Technologies Office: Building-Level Energy Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Building-Level Energy Building-Level Energy Management Systems Research Project to someone by E-mail Share Building Technologies Office: Building-Level Energy Management Systems Research Project on Facebook Tweet about Building Technologies Office: Building-Level Energy Management Systems Research Project on Twitter Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Google Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Delicious Rank Building Technologies Office: Building-Level Energy Management Systems Research Project on Digg Find More places to share Building Technologies Office: Building-Level Energy Management Systems Research Project on AddThis.com... About Take Action to Save Energy

190

Test building instrumentation cooperative agreement: heating/daylighting prototype development. Phase II. Passive and hybrid solar manufactured building project. Project status report No. 2, April 16, 1980-March 16, 1981  

DOE Green Energy (OSTI)

Progress is reported on the test building instrumentation and problems encountered are described. An instrumentation trip report is presented dealing with installation of data acquisition systems, roof and roll runner building. (MCW)

Lindsey, L.L.; Snyder, M.K.

1981-03-23T23:59:59.000Z

191

Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project, July 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Review of Independent Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project July 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ......................................................................................................................................1 2.0 Scope .........................................................................................................................................1 3.0 Background ...............................................................................................................................2

192

Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project, August 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project May 2011 August 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Scope ...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 2

193

Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project, July 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Review of Independent Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project July 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ......................................................................................................................................1 2.0 Scope .........................................................................................................................................1 3.0 Background ...............................................................................................................................2

194

Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project, August 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Review of Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project May 2011 August 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Scope ...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 2

195

Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY SUMMARY Page Cover Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi Acronyms, Abbreviations, and Conversion Charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-1 S.1 Introduction and Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-1 S.1.1 Purpose of and Need for Agency Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-3 S.1.2 Proposed Action and Scope of the CMRR EIS . . . . . . . . . . . . . . . . .

196

Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement  

Science Conference Proceedings (OSTI)

This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

VanBaalen, R.A.

1995-02-01T23:59:59.000Z

197

Honest Buildings | Open Energy Information  

Open Energy Info (EERE)

Honest Buildings Honest Buildings Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Honest Buildings Agency/Company /Organization: Honest Buildings Sector: Energy Focus Area: Buildings Resource Type: Software/modeling tools User Interface: Website Website: www.honestbuildings.com/ Web Application Link: www.honestbuildings.com/ Cost: Free Honest Buildings Screenshot References: Honest Buildings[1] Logo: Honest Buildings Honest Buildings is a software platform focused on buildings. It brings together building service providers, occupants, owners, and other stakeholders onto a single portal to exchange information, offerings, and needs. It provides a voice for everyone who occupies buildings, works with buildings, and owns buildings globally to comment, display projects, and

198

State-of-the-Art Building Concepts Lower Energy Bills: Pulte Homes -- Las Vegas, Nevada: Building America Project Summary, Hot/Dry Climates  

SciTech Connect

Houses built by Pulte Homes as part of DOE's Building America program in Las Vegas, Nevada, save money for the homeowners by reducing electric air conditioning costs and gas heating costs with little or no additional investment. And, the houses have better indoor air quality than typical new construction.

Hendron, B.

2000-08-15T23:59:59.000Z

199

New and Underutilized Building Envelope Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New and Underutilized Building Envelope Technologies New and Underutilized Building Envelope Technologies New and Underutilized Building Envelope Technologies October 8, 2013 - 2:45pm Addthis The following building envelope technologies are underutilized within the Federal sector. These technologies have been identified by FEMP as the most promising for Federal agency deployment. Review each technology for potential facility energy savings. Additional information is available by clicking on the individual technology, including technology application, key factors and considerations for deployment, and points of contact. Technology Benefits Application Weighted Score High R-Value Windows Highly insulated windows triple pane R5 or greater (U value 0.22 and lower) windows Appropriate for deployment within most building categories. These windows should be considered in building design, renovation, or during window replacement projects. 65

200

Development of a Toolkit for Calculating Linear, Change-Point Linear and Multiple-Linear Inverse Building Energy Analysis Models, ASHRAE Research Project 1050-RP, Final Report  

E-Print Network (OSTI)

This report summarizes the results of ASHRAE Research Project 1050: Development of a Toolkit for Calculating Linear, Change-Point Linear and Multiple Linear Inverse Building Energy Analysis Models. The Inverse Modeling Toolkit (WIT) is a FORTRAN 90 application for developing regression models of building energy use. IMT can identify single and multi-variable least-squares regression models. It can also identify variable-base degree-day and single and multi-variable change-point models, which have been shown to be especially useful for modeling building energy use. This report includes background information about IMT and the models, instructions for its installation and operation, and the results of accuracy and robustness testing.

Kissock, J. K.; Haberl, J. S.; Claridge, D. E.

2002-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Heating/daylighting prototype development. Phase I, Passive and Hybrid Solar Manufactured Building Project. Interim report and project status report No. 1, 1 October 1979-29 February 1980  

DOE Green Energy (OSTI)

Climatological data, both representative (typical) and extreme conditions, relevant to building energy use in Grandview, Missouri are presented. The energy-related characteristics of a particular building and its use are merged with ambient weather conditions. The graphs depict daily fluctuations in the major categories of building heating/cooling load for the experimental building (Roof Runner facility) at Butler Research Center. Data input include hourly weather and building occupancy schedules, the geometry and fixed thermal characteristics (component R-values, heat capacities, etc.) of the prototype structure, and variable conditions (status of moveable insulating shutters, HVAC operating modes, etc.). The prototype systems to be incorporated in the new Roof Runner building are shown. Both warehouse (no ceiling) and office (suspended ceiling) system types are included. The diagrams conceptually depict the heat flows in several representative operating modes, sampling the wide variety of operating conditions which will be evaluated during the testing phase of this project. Cost estimates for the designs selected for construction are provided. (MHR)

Snyder, M.; Fraker, H.; Lindsey, L.; Braham, W.; Hallagan, W.; Huffman, J.

1980-03-31T23:59:59.000Z

202

Energy Department Launches Better Buildings Workforce Guidelines...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Launches Better Buildings Workforce Guidelines Project Energy Department Launches Better Buildings Workforce Guidelines Project September 26, 2013 - 2:38pm Addthis The Energy...

203

Frederick County- Green Building Program  

Energy.gov (U.S. Department of Energy (DOE))

Frederick County administers a green building program. It has two goals: (1) to ensure that County building projects implement strategies that enhance environmental performance and fiscal...

204

Spent Nuclear Fuel project stage and store K basin SNF in canister storage building functions and requirements. Revision 1  

SciTech Connect

This document establishes the functions and requirements baseline for the implementation of the Canister Storage Building Subproject. The mission allocated to the Canister Storage Building Subproject is to provide safe, environmentally sound staging and storage of K Basin SNF until a decision on the final disposition is reached and implemented

Womack, J.C.

1995-10-24T23:59:59.000Z

205

Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model  

Science Conference Proceedings (OSTI)

In recent years, BOT approach has provided an increasingly popular project financing to move toward infrastructure development in Asian countries such as Iran. There are many complexities in projects because of the variety of factors in project's trend ... Keywords: BOT projects, FMADM, Risk identification, Risk ranking

Sadoullah Ebrahimnejad; Seyed Meysam Mousavi; Hamed Seyrafianpour

2010-01-01T23:59:59.000Z

206

Design criteria for lighting and controls modifications OSW, CTF, COS buildings  

SciTech Connect

This project will retrofit the lighting systems in three (3) buildings at the Mound Plant. The buildings are Central Operational Support (COS), Component Test Facility (CTF) and operational Support West (OSW). This project consists of the installation of occupancy sensors in private offices, break areas and laboratories, automatic control lighting, (occupied/unoccupied) with the existing DDC system, removing selected light fixtures, replacing incandescent lighting and reprogramming some of the software controlling the operation of the air handling units in the a forementioned buildings.

1991-08-01T23:59:59.000Z

207

Building Technologies Office: Small- and Medium-Sized Building Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

Small- and Medium-Sized Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project to someone by E-mail Share Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Facebook Tweet about Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Twitter Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Google Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Delicious Rank Building Technologies Office: Small- and Medium-Sized Building

208

A prototype data archive for the PIER 'thermal distribution systems in commercial buildings' project  

SciTech Connect

A prototype archive for a selection of building energy data on thermal distribution systems in commercial buildings was developed and pilot tested. While the pilot demonstrated the successful development of the data archive prototype, several questions remain about the usefulness of such an archive. Specifically, questions on the audience, frequency of use, maintenance, and updating of the archive would need to be addressed before this prototype is taken to the next level.

Diamond, Rick C.; Wray, Craig P.; Smith, Brian V.; Dickerhoff, Darryl J.; Matson, Nance E.; Cox, Skylar A.

2004-01-01T23:59:59.000Z

209

Building Energy Code  

Energy.gov (U.S. Department of Energy (DOE))

''Much of the information presented in this summary is drawn from the U.S. Department of Energys (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

210

Building Energy Standards  

Energy.gov (U.S. Department of Energy (DOE))

''Much of the information presented in this summary is drawn from the U.S. Department of Energys (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

211

Model Building Energy Code  

Energy.gov (U.S. Department of Energy (DOE))

''Much of the information presented in this summary is drawn from the U.S. Department of Energys (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

212

Beyond Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

without compromising future generations SUSTAINABLE INL Buildings Beyond Buildings Sustainability Beyond Buildings INL is taking sustainability efforts "beyond buildings" by...

213

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh,...

214

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for...

215

Final Report for the Energy Efficient and Affordable Small Commercial and Residential Buildings Research Program -- Project 6.6 - Development of the Assessment Framework  

SciTech Connect

This report presents a methodology for assessing the impacts of potential products related to the buildings end-use energy efficiency program area that may results from projects performed as part of the California Energy Commissions (CECs) Public Interest Energy Research (PIER) Program. The methodology developed and described in this report applies strictly to new products designed for use in commercial buildings in California. We consider a new product any product or service offering that has an energy efficiency improvement feature or component that can be clearly characterized by either a performance metric or an improvement factor that expresses the improvement potential over the best currently available products or the installed base of the same or similar products. New products could include: new equipment in support of heating, ventilation, and air-conditioning (HVAC), lighting, domestic water heating or any other end-uses relevant for commercial buildings; diagnostics, controls, or monitoring service products that either assists in or perform monitoring or control functions of the energy uses or the thermal integrity of the building shell.

Kintner-Meyer, Michael CW; Anderson, Dave M.; Hostick, Donna J.

2003-06-30T23:59:59.000Z

216

Energy Efficient Buildings Hub  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Henry C. Foley Henry C. Foley April 3, 2013 Presentation at the U.S. DOE Building Technologies Office Peer Review Meeting Purpose and Objectives * Problem Statement - Building energy efficiency has not increased in recent decades compared to other sectors especially transportation - Building component technologies have become more energy efficient but buildings as a whole have not * Impact of Project - A 20% reduction in commercial building energy use could save the nation four quads of energy annually * Project Focus - This is more than a technological challenge; the technology needed to achieve a 10% reduction in building energy use exists - The Hub approach is to comprehensively and systematically address

217

Building America System Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building America System Building America System Research Eric Werling, DOE Ren Anderson, NREL eric.werling@ee.doe.gov, 202-586-0410 ren.anderson@nrel.gov, 303-384-7443 April 2, 2013 Building America System Innovations: Accelerating Innovation in Home Energy Savings 2 | Program Name or Ancillary Text eere.energy.gov Project Relevance 3 | Building Technologies Office eere.energy.gov Building America Fills Market Need for a High-Performance Homes HUB of Innovation

218

Operation Redwing. Project 3. 1. Effect of length of positive phase of blast on drag-type and semidrag-time industrial buildings  

SciTech Connect

The primary objective of the project was to obtain information regarding the effect of the length of the positive phase of blast on the response of drag and semidrag structures. A total of six steel-frame buildings were tested during this operation. The structure of each type nearest ground zero was located such that if the yield of the weapon was near the lower limit of its predicted range, it would probably undergo considerable inelastic deformation. Conversely, those structures farthest from ground zero were located such that if the yield of the nuclear device was near the upper limit of its predicted range, they would be substantially deformed, but would not collapse. The third building of each type was located at an intermediate point between these two extremes. Instrumentation was provided to obtain records of the transient structural deflections, strains, and accelerations, as well as of overpressure and dynamic pressure versus time at the sites of the various test structures.

Sinnamon, G.K.; Haltiwanger, J.D.; Newmark, N.M.

1985-09-01T23:59:59.000Z

219

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Harlingen Irrigation District Cameron County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for each of the four components of the proposed project (i.e., canal meters and telemetry equipment, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for each of the four components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $31.37 per ac-ft and energy savings are measured at an aggregate value of $0.0002253 per BTU (i.e., $0.769 per kwh). In addition, expected values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $26.87 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001603 per BTU ($0.547 per kwh). The amount of initial construction costs per dollar of total annual economic savings is estimated to be -1.30.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-10-01T23:59:59.000Z

220

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by the Cameron County Irrigation District No. 2 (a.k.a. San Benito) to the North American Development Bank (NADBank) and Bureau of Reclamation. Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., a lined interconnect between Canals 39 and 13-A1 and replacement of the Rio Grande diversion pumping plant). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $41.26 per ac-ft and energy savings are measured at an aggregate value of $0.0001586 per BTU (i.e., $0.541 per kwh). In addition, expected values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $157.07 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001777 per BTU ($0.606 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.80.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Commercial Buildings Consortium  

NLE Websites -- All DOE Office Websites (Extended Search)

technologies and practices 4 | Building Technologies Office eere.energy.gov Purpose & Objectives (cont.) Project Focus and Strategies: Collaboration * Facilitate information...

222

Project Kittyhawk: Building a Global-Scale Computer Blue Gene/P as a Generic Computing Platform  

E-Print Network (OSTI)

power plants [8], colocating physical machines in large data centers, over-committing physical hardware to building a power plant from a collection of portable generators. That is, commod- ity computers were never. The explosive growth of the Internet is creating a demand for inexpensive online computing capacity. This demand

Appavoo, Jonathan

223

Radiation Source Replacement Workshop  

Science Conference Proceedings (OSTI)

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

224

Oak Ridge D and D Plan 3515 Project - Technology Review (2007) and GammaCam Technology Demonstration for Characterizing Building 3515 at Oak Ridge (2007)  

Science Conference Proceedings (OSTI)

This paper presents the results from the Characterization, Decontamination and Decommissioning (CD and D) Study performed by MSE Technology Application, Inc. (MSE) to assist the U.S. Department of Energy (DOE) and Oak Ridge National Laboratory (ORNL) in the preparation of a Project Execution Plan and Remediation Plan for Building 3515 at ORNL. Primary objectives of this study were to identify innovative CD and D technologies and methodologies and recommend alternatives applicable to the CD and D of Building 3515. Building 3515 is a small heavily shielded concrete and cement block structure centrally located in the Bethel Valley portion of the ORNL. The building's interior is extensively contaminated with Cesium 137 (Cs-137), the primary contaminant of concern. A previous attempt to characterize the building was limited to general interior area radiation exposure level measurements and a few surface smears gathered by inserting monitoring equipment into the building on long poles. Consequently, the spatial distribution of the gamma radiation source inside the building was not determined. A subsequent plan for D and D of the building presented a high risk of worker radiation dose in excess of as low as reasonably achievable (ALARA) because the source of the interior gamma radiation field is not completely understood and conventional practices required workers to be in close proximity of the building. As part of an initial literature search, MSE reviewed new generation gamma source characterization technologies and identified the GammaCam{sup TM} portable gamma ray imaging system as an innovative technology applicable to locating the dominant gamma ray sources within the building. The GammaCam{sup TM} gamma-ray imaging system is a commercially available technology marketed by the EDO Corporation. This system consists of a sensor head with a co-aligned camera and a portable computer. The system is designed to provide two-dimensional spatial mappings of gamma ray emitting nuclides in real time. The gamma radiation sensor and camera can be set up within or outside of the radiation field while the system operator and PC can be located 30 to 60 m (100 to 200 ft) from the sensor head. The system has been used successfully at numerous DOE and commercial nuclear facilities to precisely locate gamma radiation sources. However, literature attesting to the ability of this technology to detect radiation sources within heavily shielded structures was not available. Consequently, MSE was not certain if this technology would be capable of locating gamma ray sources within the heavily shielded Building 3515. To overcome this uncertainty, MSE sent two individuals to the EDO Corporation for training. At completion of the training, MSE leased the GammaCam{sup TM} portable system and brought it to ORNL to evaluate the capability of the system. An overview from this evaluation is summarized in this paper. (authors)

Byrne-Kelly, D.; Hart, A.; Brown, Ch.; Jordan, D. [MSE Technology Applications, Inc., Montana (United States); Phillips, E. [U.S. Department of Energy, Oak Ridge Operations Office, Oak Ridge, Tennessee (United States)

2008-07-01T23:59:59.000Z

225

EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78: 300 Area Steam Plant Replacement, Hanford Site, Richland, 78: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for a proposed energy conservation measure for a number of buildings in the 300 Area of the U.S. Department of Energy Hanford Site. The proposed action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a source for many of these units and constructing a central control building to operate and maintain the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 12, 1997 EA-1178: Finding of No Significant Impact

226

New York City - Green Building Requirements for Municipal Buildings |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Requirements for Municipal Buildings Green Building Requirements for Municipal Buildings New York City - Green Building Requirements for Municipal Buildings < Back Eligibility Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Appliances & Electronics Commercial Lighting Lighting Bioenergy Solar Windows, Doors, & Skylights Buying & Making Electricity Water Water Heating Wind Program Info State New York Program Type Energy Standards for Public Buildings Provider Mayor's Office of Operations In 2005 New York City passed a law (Local Law No. 86) making a variety of green building and energy efficiency requirements for municipal buildings and other projects funded with money from the city treasury. The building

227

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio  

SciTech Connect

This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

Arends, J.; Sandusky, William F.

2010-05-28T23:59:59.000Z

228

Materials development and field demonstration of high-recycled-content concrete for energy-efficient building construction  

SciTech Connect

The project developed high-recycled-content concrete material with balanced structural and thermal attributes for use in energy-efficient building construction. Recycled plastics, tire, wool, steel and concrete were used as replacement for coarse aggregates in concrete and masonry production. With recycled materials the specific heat and thermal conductivity of concrete could be tailored to enhance the energy-efficiency of concrete buildings. A comprehensive field project was implemented which confirmed the benefits of high-recycled-content concrete for energy-efficient building construction.

Ostowari, Ken; Nosson, Ali

2000-09-30T23:59:59.000Z

229

Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)  

Science Conference Proceedings (OSTI)

Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

1997-11-14T23:59:59.000Z

230

Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.  

SciTech Connect

The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

Anderson, Temashio [Scotts Valley Band of Pomo Indians

2013-06-28T23:59:59.000Z

231

Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.  

SciTech Connect

The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

Anderson, Temashio [Scotts Valley Band of Pomo Indians

2013-06-28T23:59:59.000Z

232

DOE - Better Building  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy | Energy Efficiency & Renewable Energy logo U.S. Department of Energy | Energy Efficiency & Renewable Energy logo EERE Home | Programs & Offices | Consumer Information Better Buildings Logo Better Buildings Update July 2013 Inside this edition: Highlights from the 2013 Efficiency Forum Recap: Better Buildings Summit for State & Local Communities Launching the Better Buildings Webinar Series Better Buildings Challenge Implementation Models and Showcase Projects Updated Better Buildings Websites New Members Highlights from the 2013 Efficiency Forum More than 170 people attended the second annual Better Buildings Efficiency Forum for commercial and higher education Partners in May at the National Renewable Energy Laboratory (NREL) in Golden, Colorado-the nation's largest net-zero energy office building. DOE thanks all Better Buildings Alliance Members and Better Buildings Challenge Partners that participated in the Efficiency Forum.

233

Video face replacement  

E-Print Network (OSTI)

We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

Dale, Kevin

234

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

235

Commercial Building Partnership  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Partnership Building Partnership (CBP) Adam Hirsch National Renewable Energy Laboratory Email: Adam.Hirsch@nrel.gov Phone: (303) 384-7874 Wednesday, April 3 2013 BTO Program Peer Review 2 | Building Technologies Office eere.energy.gov * 2008: NREL + PNNL selected partner companies and technical consultants and won joint solicitation - Collaborators selected based on commitment to hitting project goals and likelihood of success * Projects began in 2009 with aim of 3-5 year completion

236

Commercial Building Partnership  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Partnership Building Partnership (CBP) Adam Hirsch National Renewable Energy Laboratory Email: Adam.Hirsch@nrel.gov Phone: (303) 384-7874 Wednesday, April 3 2013 BTO Program Peer Review 2 | Building Technologies Office eere.energy.gov * 2008: NREL + PNNL selected partner companies and technical consultants and won joint solicitation - Collaborators selected based on commitment to hitting project goals and likelihood of success * Projects began in 2009 with aim of 3-5 year completion

237

The Infinity Project: building a high school curriculum which emphasizes the engineering, math, and science principles of modern technology  

Science Conference Proceedings (OSTI)

A bold new plan has been initiated to bring state-of-the-art science-based technology and engineering education to high schools. This effort, called The INFINITY Project, aims to develop a novel and interactive curriculum emphasizing the engineering ...

M. A. Yoder; R. Athale; S. Douglas; D. Munson; G. Orsak; J. Treichler; S. Wood

2000-10-01T23:59:59.000Z

238

Alabama Institute for Deaf and Blind to Launch Lighting Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Institute for Deaf and Blind to Launch Lighting Project Institute for Deaf and Blind to Launch Lighting Project Alabama Institute for Deaf and Blind to Launch Lighting Project August 20, 2010 - 12:29pm Addthis The Alabama Institute for Deaf and Blind is replacing almost 2,900 lights in 19 buildings across its campuses.| Photo courtesy of Alabama Institute for Deaf and Blind The Alabama Institute for Deaf and Blind is replacing almost 2,900 lights in 19 buildings across its campuses.| Photo courtesy of Alabama Institute for Deaf and Blind Stephen Graff Former Writer & editor for Energy Empowers, EERE For over a century, students at the Alabama Institute for Deaf and Blind (AIDB) have proudly displayed the school colors-blue and red-in the hallways, classrooms and dorm rooms. But this school year, they're "Going Green."

239

Building Technologies Office: Integrated Predictive Demand Response  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Predictive Integrated Predictive Demand Response Controller Research Project to someone by E-mail Share Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Facebook Tweet about Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Twitter Bookmark Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Google Bookmark Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Delicious Rank Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Digg Find More places to share Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on AddThis.com...

240

The Use of BIM in Construction for Decision Making: A Case of Irregular-Shaped Steel-Framed Building Construction Project in South Korea  

E-Print Network (OSTI)

Building Information Modeling (BIM) is the comprehensive process of developing a computer model of a building project in the phases of designing, analyzing, building, managing, refurbishing and even demolishing the building. Applying BIM to public construction has become an obligation in South Korea. According to the Public Procurement Service in South Korea, the use of BIM has been compulsory on all government projects over $44M since 2012. Moreover, from 2013, the application of BIM will be expanded to all public construction projects over $27.6M. Finally, beginning in 2016, all public construction projects will be required to use BIM. Most research on BIM in South Korea has been focused on developing regulations and policies, application of BIM, solving technical problems, and searching for the value of BIM. However, the use of BIM in Korea during construction for decision-making has not been thoroughly reported in Korea yet. One may be wondering then if BIM is indeed well utilized in Korea during construction for practical decision-making. The objective of this research centers on investigating how a construction company in South Korea is using BIM for its decision making process during ongoing construction phases. For this investigation, a case study method was used. The construction operations on a jobsite in South Korea were monitored June to August in 2012. Field notes were taken to document the decision-making process and information used during field coordination meetings. A total of 36 cases were monitored and recorded. The use of BIM on field was then compared to the industry expectations indicated in the literature. Specifically, the use of BIM for scheduling, estimating, coordination, review of drawings, and tracking for change orders were carefully monitored and compared with the industry expectations as they were addressed in the literature. The results of this research study were mixed. That is, there are not only similarities, but also differences between BIMs role used for decision making at the construction site, and its expected role described in previous research. The similarities were regarded as minimizing reworking. This factor came to fruition at a construction site by minimizing error, omission in design phases, or congruence in design and construction tasks. These factors could have a positive effect on estimating and scheduling at a construction site. However, use of BIM at a construction site was still limited in reducing repetitive work when 2D drawings were not able to provide enough information to conduct construction. Additionally, even though this study was successful in revealing the connection between the decision making process and the application of BIM at a construction site, the results of the study may not be generalizable to the construction industry as a whole in South Korea. Therefore, further research is needed to ensure its applicability to other construction projects.

Yum, Sang Guk

2013-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Measurement of energy performance in a small bank building  

SciTech Connect

This report summarizes the measured results from a field study of the performance of a low-cost controls retrofit in a small bank building in Knoxville, Tennessee. The retrofit consisted of an upgrade of heating and cooling system controls and new operating strategies. The study was undertaken to better understand how commercial energy use measurement studies should be performed and to demonstrate the effectiveness of a low-cost controls retrofit in a small commercial building. This report describes the details of the project, including building and building system characteristics, the HVAC control changes implemented, energy end use patterns, and the heating and cooling energy savings achieved. An improved control strategy involving thermostat setback/setup and on/off control was devised around a single replacement programmable thermostat. The strategy allowed thermostat setback/setup control of the primary HVAC system in the building and provided on/off (time-of-day) control for the two secondary systems. The energy efficiency improvements provided a 33% reduction in heating and a 21% reduction in cooling energy consumptions. Simple payback for the retrofit, including installation cost, was less than 1 year. In addition to reducing the energy needs of the building, the replacement electronic thermostat provided improved interior comfort. 10 refs., 12 figs., 6 tabs.

Sharp, T.R.; MacDonald, J.M.

1990-04-01T23:59:59.000Z

242

Building Technologies Office: Test Homes and Community Scale...  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Homes and Community Scale Projects to someone by E-mail Share Building Technologies Office: Test Homes and Community Scale Projects on Facebook Tweet about Building...

243

Building Technologies Office: Distributed Intelligent-Automated...  

NLE Websites -- All DOE Office Websites (Extended Search)

Distributed Intelligent-Automated Demand Response Building Management System Research Project to someone by E-mail Share Building Technologies Office: Distributed...

244

Baseline vs. Replacement High Bay Lighting Evaluation  

Science Conference Proceedings (OSTI)

Energy efficient lighting has been a means to significant energy savings for many facilities around the world. New developments in fluorescent, induction, LED (light-emitting diode), and plasma lighting technologies have spurred various building managers to replace or retrofit existing lighting fixtures. These advances in lighting sources often allow conservation of electricity, better quality of light, and more flexibility in the control of light. However, these new lighting sources still have ...

2013-11-06T23:59:59.000Z

245

DOE/EIS-0350: Record of Decision: Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement, Los Alamos National Laboratory, Los Alamos, NM (02/14/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Federal Register / Vol. 69, No. 29 / Thursday, February 12, 2004 / Notices 1 Paiute Pipeline Company, 105 FERC ¶ 61,271 selecting third-party contractors will now be consistent with the approach currently used for applications for certification of natural gas facilities. The attached document provides an overview for starting the process. Additional information is available on the Commission's Web site at http:// www.ferc.gov/industries/hydropower/ enviro/third-party/tpc.asp. Magalie R. Salas, Secretary. Office of Energy Projects; Third-Party Contracting Program The Office of Energy Project's voluntary ''third-party contracting'' (3-PC) program enables applicants seeking certificates for natural gas facilities or licenses for hydroelectric power projects to fund a third-

246

BEETIT: Building Cooling and Air Conditioning  

Science Conference Proceedings (OSTI)

BEETIT Project: The 14 projects that comprise ARPA-Es BEETIT Project, short for Building Energy Efficiency Through Innovative Thermodevices, are developing new approaches and technologies for building cooling equipment and air conditioners. These projects aim to drastically improve building energy efficiency and reduce greenhouse gas emissions such as carbon dioxide (CO2) at a cost comparable to current technologies.

None

2010-09-01T23:59:59.000Z

247

Building Technologies Office: Residential Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Buildings Residential Buildings to someone by E-mail Share Building Technologies Office: Residential Buildings on Facebook Tweet about Building Technologies Office: Residential Buildings on Twitter Bookmark Building Technologies Office: Residential Buildings on Google Bookmark Building Technologies Office: Residential Buildings on Delicious Rank Building Technologies Office: Residential Buildings on Digg Find More places to share Building Technologies Office: Residential Buildings on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Technology Research, Standards, & Codes Popular Residential Links Success Stories Previous Next Warming Up to Pump Heat. Lighten Energy Loads with System Design. Cut Refrigerator Energy Use to Save Money. Tools EnergyPlus Whole Building Simulation Program

248

Automated Demand Response Technology Demonstration Project for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demonstration Project for Small and Medium Commercial Buildings Title Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings...

249

First SNS Target Replacement  

E-Print Network (OSTI)

· Replacement of the target module was accomplished using only remote handling tooling and procedures (hands operations. Remote Handling Control Room Manipulator Gallery #12;10 Managed by UT-Battelle for the U ­ Interim process fitting leak testing ­ Limitations on remote handling equipment reliability ­ Limitations

McDonald, Kirk

250

Embedded Commissioning for Building Design  

E-Print Network (OSTI)

Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning as a building delivery embedded process that persistently verifies and validates design intent throughout the building lifecycle process. In the building lifecycle approach, buildings are considered to have cradle-to-grave life spans. They are modeled through a variety of different developmental phases. In this research project, we intend to build the necessary theory and tools to support the embedded commissioning process as a co-function of building lifecycle.

Akin, O.; Turkaslan-Bulbul, M. T.; Gursel, I.; Garrett, J. H.; Akinci, B.; Wang, H.

2004-01-01T23:59:59.000Z

251

Nevada Energy Code for Buildings  

Energy.gov (U.S. Department of Energy (DOE))

''Much of the information presented in this summary is drawn from the U.S. Department of Energys (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more...

252

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

253

Microsoft Word - B-8.Replacement-3.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Rate Schedule Replacement-3 Availability: This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the Government and the customer from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, Cordell Hull, and Laurel Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") . Applicability: This rate schedule shall be applicable to the sale of wholesale energy purchased to

254

ARRANGEMENT FOR REPLACING FILTERS  

DOE Patents (OSTI)

An improved filtered air exhaust system which may be continually operated during the replacement of the filters without the escape of unfiltered air is described. This is accomplished by hermetically sealing the box like filter containers in a rectangular tunnel with neoprene covered sponge rubber sealing rings coated with a silicone impregnated pneumatic grease. The tunnel through which the filters are pushed is normal to the exhaust air duct. A number of unused filters are in line behind the filters in use, and are moved by a hydraulic ram so that a fresh filter is positioned in the air duct. The used filter is pushed into a waiting receptacle and is suitably disposed. This device permits a rapid and safe replacement of a radiation contaminated filter without interruption to the normal flow of exhaust air.

Blomgren, R.A.; Bohlin, N.J.C.

1957-08-27T23:59:59.000Z

255

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

256

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory U.S. Department of Energy Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

257

MANHATTAN PROJECT  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy traces its origins to World War II and the Manhattan Project effort to build the first atomic bomb. As the direct descendent of the Manhattan Engineer District, the...

258

Steam generator replacement overview  

Science Conference Proceedings (OSTI)

Since nuclear power began to be widely used for commercial purposes in the 1960s, unit operators have experienced a variety of problems with major components. Although many of the problems have diminished considerably, those associated with pressurized water reactor (PWR) steam generators persist. Steam generator problems rank second, behind refueling outages, as the most significant contributor to lost electricity generation. As of December 31, 1995, 38 steam generators had been replaced in 13 of the 72 operating PWRs, and three units had been shut down prematurely, due primarily (or partially) to degradation of their steam generators: Portland General Electric`s Trojan unit, located in Prescott, OR, in 1992; Southern California Edison`s San Onofre 1, located in San Clemente, CA, in 1992; and Sacramento Municipal Utility District`s Rancho Seco unit in 1989. In the coming years, operators of PWRs in the US with degraded steam generators will have to decide whether to make annual repairs (with eventual derating likely), replace the generators or shut the plants down prematurely. To understand the issues and decisions utility managers face, this article examines problems encountered at steam generators over the past few decades and identifies some of the remedies that utility operators and the nuclear community have employed, including operational changes, maintenance, repairs and steam generator replacement.

Chernoff, H. [Science Applications International Corp., McLean, VA (United States); Wade, K.C. [USDOE Energy Information Administration, Washington, DC (United States)

1996-01-01T23:59:59.000Z

259

Building Technologies Office: Commercial Building Energy Asset...  

NLE Websites -- All DOE Office Websites (Extended Search)

TECHNOLOGIES RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS APPLIANCE & EQUIPMENT STANDARDS BUILDING ENERGY CODES EERE Building Technologies Office Commercial Buildings...

260

OpenStudio: Building Design Expertise at Your Fingertips | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OpenStudio: Building Design Expertise at Your Fingertips OpenStudio: Building Design Expertise at Your Fingertips OpenStudio: Building Design Expertise at Your Fingertips October 4, 2011 - 2:50pm Addthis The National Renewable Energy Laboratory developed the OpenStudio Application Suite and Development Platform to help architects and engineers model whole-building energy use. Roland Risser Roland Risser Program Director, Building Technologies Office Where can I download OpenStudio? Download the free OpenStudio suite of tools from the National Renewable Energy Lab website. Like many weekend warriors, I enjoy tackling small home improvement projects, like replacing a door or installing an underground sprinkler system. But I want to get expert advice before I start, so I can avoid costly mistakes and achieve the best results.

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

OpenStudio: Building Design Expertise at Your Fingertips | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OpenStudio: Building Design Expertise at Your Fingertips OpenStudio: Building Design Expertise at Your Fingertips OpenStudio: Building Design Expertise at Your Fingertips October 4, 2011 - 2:50pm Addthis The National Renewable Energy Laboratory developed the OpenStudio Application Suite and Development Platform to help architects and engineers model whole-building energy use. Roland Risser Roland Risser Program Director, Building Technologies Office Where can I download OpenStudio? Download the free OpenStudio suite of tools from the National Renewable Energy Lab website. Like many weekend warriors, I enjoy tackling small home improvement projects, like replacing a door or installing an underground sprinkler system. But I want to get expert advice before I start, so I can avoid costly mistakes and achieve the best results.

262

Energy Modeling of a High Performance Building in the U.A.E. for Sustainability Certification  

E-Print Network (OSTI)

The Sheikh Zayed Desert Learning Centre (SZDLC) is a high performance sustainable exhibition center under construction in the U.A.E, aiming for the highest achievable sustainability ratings within the LEED and Estidama sustainability building rating programs. The Leadership in Energy and Environmental Design (LEED) sustainable building program provides a set of criteria for rating sustainable buildings (U.S. Green Building Council 2009). The Estidama rating program, currently in its pilot phase, is an upcoming sustainable building guideline for the Emirate of Abu Dhabi (Urban Planning Council, Abu Dhabi 2008). The Estidama program is similar to LEED in many ways, with a focus on the integrative design process for sustainable building projects. Both of these rating programs assign a large share of points to reducing energy usage which is related to CO2 production. To demonstrate that a design has improved performance, the rating programs encourage the use of whole building energy simulation. The building as it is designed is simulated and compared to a baseline building, where the building envelope and systems are replaced with materials and components meeting minimum acceptable standards. The percentage improvement of the As-Designed building over the Baseline building dictates the number of points awarded in the respective categories. Innovative solutions in managing the simulation complexity and visualizing energy performance were necessitated by the complexity of performing the building simulations. Improved decision support during the design phase and a better understanding of energy usage in the building are expected to improve the energy efficiency, operating costs, and environmental impact of the building. The detail available from an ambitious modeling approach is presented, demonstrating the usefulness of building energy performance simulation for sustainability ratings as well as design decision support.

Jones, M.; Ledinger, S.

2010-01-01T23:59:59.000Z

263

Effective, low-cost HVAC controls upgrade in a small bank building  

Science Conference Proceedings (OSTI)

This report summarizes the measured results from a field study of the performance of a low-cost controls retrofit in a small bank building in Knoxville, TN. The retrofit consisted of a simple upgrade of heating and cooling system controls and new operating strategies. The project was undertaken to better understand how commercial energy use measurement studies should be performed and to demonstrate the effectiveness of a low-cost controls retrofit in a small commercial building. This report describes the details of the project, including building and building system characteristics, the HVAC control changes made, energy end use patterns, and the heating and cooling energy savings achieved. An improved control strategy involving thermostat setback/setup and on/off control was devised around a single replacement programmable thermostat. The strategy allowed thermostat setback/setup control of the primary HVAC system in the building and provided on/off (time-of-day) control for the two secondary systems. The energy efficiency improvements provided a 33% reduction in heating and a 21% reduction in cooling energy consumptions. Simple payback for the retrofit, including installation cost, was under 1 year. In addition to reducing the energy needs of the building, the replacement electronic thermostat provided improved interior comfort. 9 refs., 12 figs., 3 tabs.

Sharp, T.R.; MacDonald, J.M.

1990-01-01T23:59:59.000Z

264

Ohio State 4-H Green Building  

DOE Green Energy (OSTI)

Congressionally directed project to pay in part for construction of a building on the Ohio State University campus.

McCleery, William, A.; Park, James, D.

2007-11-19T23:59:59.000Z

265

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

266

Commercial Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Links Commercial Building Ventilation and Indoor Environmental Quality Batteries and Fuel Cells Buildings Energy Efficiency Electricity Grid Energy Analysis Energy...

267

Building Data Visualization  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Building Data Visualization contour plot Figure 1: Contour plot showing the various operating stages of occupancy sensors described in the case study. Data visualization for buildings is the display of a rich set of variables and parameters that managers can use to verify the energy savings of energy- efficient technology and identify malfunctions in building equipment or problems with operating strategies. Effective data visualization depends on having graphic presentation formats that reveal the phenomena relevant to the building's performance. A research project at the Center for Building Science is aimed at developing data visualization techniques for improved building management. Buildings with energy management control systems as well as dedicated monitoring equipment in the

268

Building Technologies Office: HVAC Optimized Heat Exchangers Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimized Heat Optimized Heat Exchangers Research Project to someone by E-mail Share Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Facebook Tweet about Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Twitter Bookmark Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Google Bookmark Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Delicious Rank Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Digg Find More places to share Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research

269

Literature Building Update January 15, 2009  

E-Print Network (OSTI)

tiles found to be water damaged. Completed - All building pipe insulation has been repaired. Poor pipeLiterature Building Update January 15, 2009 Steps taken in response to EMF concerns: Completed ballasts and replaced with solid state equipment to reduce EMF and save energy throughout the building

Krstic, Miroslav

270

Building Technologies Office: Building America Research Teams  

NLE Websites -- All DOE Office Websites (Extended Search)

Teams Teams Building America research projects are completed by industry consortia (teams) comprised of leading experts from across the country. The research teams design, test, upgrade and build high performance homes using strategies that significantly cut energy use. Building America research teams are selected through a competitive process initiated by a request for proposals. Team members are experts in the field of residential building science, and have access to world-class research facilities, partners, and key personnel, ensuring successful progress toward U.S. Department of Energy (DOE) goals. This page provides a brief description of the teams, areas of focus, and key team members. Advanced Residential Integrated Energy Solutions Alliance for Residential Building Innovation

271

DOE/EA-1497: Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Intake Pipeline Replacement Project, Cameron and Calcasieu Parishes, Louisiana (8/31/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT RAW WATER INTAKE PIPELINE REPLACEMENT STRATEGIC PETROLEUM RESERVE WEST HACKBERRY FACILITY AGENCY: Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of

272

Better Buildings Challenge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Better Buildings Challenge Better Buildings Challenge Better Buildings Challenge Better Buildings Challenge: Leadership, Transparency and Results Read more Partners Recognized at Industrial Energy Technology Conference Read more Jones Lang LaSalle's Showcase Project: Moscone Convention Center Read more Portland Public Schools' Showcase Project: Benson Polytechnic High School Read more Delaware's Showcase Project: Carvel State Office Building Read more Challenge Partners & Allies Represent 2 Billion Square Feet Committed $2 Billion in Financing through Allies 300+ Manufacturing Facilities Highlights Program Expansion: Multifamily Residential Better Buildings Challenge: Progress Update - Spring 2013 Partner Solutions: Implementation Models Partner Progress Against Energy Performance Goals Demonstrating Results: Showcase Projects

273

Joint China-United States Report for Year 1 Insulation Materials and Systems Project Area Clean Energy Research Center Building Energy Efficiency (CERC-BEE)  

Science Conference Proceedings (OSTI)

In November of 2009, the presidents of China and the U.S. announced the establishment of the Clean Energy Research Center (CERC). This broad research effort is co-funded by both countries and involves a large number of research centers and universities in both countries. One part of this program is focused on improving the energy efficiency of buildings. One portion of the CERC-BEE was focused on building insulation systems. The research objective of this effort was to Identify and investigate candidate high performance fire resistant building insulation technologies that meet the goal of building code compliance for exterior wall applications in green buildings in multiple climate zones. A Joint Work Plan was established between researchers at the China Academy of Building Research and Oak Ridge National Laboratory. Efforts in the first year under this plan focused on information gathering. The objective of this research program is to reduce building energy use in China via improved building insulation technology. In cold regions in China, residents often use inefficient heating systems to provide a minimal comfort level within inefficient buildings. In warmer regions, air conditioning has not been commonly used. As living standards rise, energy consumption in these regions will increase dramatically unless significant improvements are made in building energy performance. Previous efforts that defined the current state of the built environment in China and in the U.S. will be used in this research. In countries around the world, building improvements have typically followed the implementation of more stringent building codes. There have been several changes in building codes in both the U.S. and China within the last few years. New U.S. building codes have increased the amount of wall insulation required in new buildings. New government statements from multiple agencies in China have recently changed the requirements for buildings in terms of energy efficiency and fire safety. A related issue is the degree to which new standards are adopted and enforced. In the U.S., standards are developed using a consensus process, and local government agencies are free to implement these standards or to ignore them. For example, some U.S. states are still using 2003 versions of the building efficiency standards. There is also a great variation in the degree to which the locally adopted standards are enforced in different U.S. cities and states. With a more central process in China, these issues are different, but possible impacts of variable enforcement efficacy may also exist. Therefore, current building codes in China will be compared to the current state of building fire-safety and energy-efficiency codes in the U.S. and areas for possible improvements in both countries will be explored. In particular, the focus of the applications in China will be on green buildings. The terminology of 'green buildings' has different meanings to different audiences. The U.S. research is interested in both new, green buildings, and on retrofitting existing inefficient buildings. An initial effort will be made to clarify the scope of the pertinent wall insulation systems for these applications.

Stovall, Therese K [ORNL; Biswas, Kaushik [ORNL; Song, Bo [China Academy of Building Research; Zhang, Sisi [China Academy of Building Research

2012-08-01T23:59:59.000Z

274

Residential Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Apartment building exterior and interior Apartment building exterior and interior Residential Buildings EETD's research in residential buildings addresses problems associated with whole-building integration involving modeling, measurement, design, and operation. Areas of research include the movement of air and associated penalties involving distribution of pollutants, energy and fresh air. Contacts Max Sherman MHSherman@lbl.gov (510) 486-4022 Iain Walker ISWalker@lbl.gov (510) 486-4692 Links Residential Building Systems Group Batteries and Fuel Cells Buildings Energy Efficiency Applications Commercial Buildings Cool Roofs and Heat Islands Demand Response Energy Efficiency Program and Market Trends High Technology and Industrial Systems Lighting Systems Residential Buildings Simulation Tools Sustainable Federal Operations

275

Virtual Project Data Integration Testbed  

Science Conference Proceedings (OSTI)

... these findings to emphasize research and development ... and more productive project delivery. These include API, ASHRAE, ASME, buildingSMART ...

2010-02-19T23:59:59.000Z

276

High Performance Buildings Database  

DOE Data Explorer (OSTI)

The High Performance Buildings Database is a shared resource for the building industry. The Database, developed by the U.S. Department of Energy and the National Renewable Energy Laboratory (NREL), is a unique central repository of in-depth information and data on high-performance, green building projects across the United States and abroad. The Database includes information on the energy use, environmental performance, design process, finances, and other aspects of each project. Members of the design and construction teams are listed, as are sources for additional information. In total, up to twelve screens of detailed information are provided for each project profile. Projects range in size from small single-family homes or tenant fit-outs within buildings to large commercial and institutional buildings and even entire campuses.

The Database is a data repository as well. A series of Web-based data-entry templates allows anyone to enter information about a building project into the database. Once a project has been submitted, each of the partner organizations can review the entry and choose whether or not to publish that particular project on its own Web site. Early partners using the database include:

  • The Federal Energy Management Program
  • The U.S. Green Building Council
  • The American Institute of Architects' Committee on the Environment
  • The Massachusetts Technology Collaborative
  • Efficiency Vermont
    • Copied (then edited) from http://eere.buildinggreen.com/partnering.cfm

277

Whole Building Performance-Based Procurement Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Whole Building Performance-Based Whole Building Performance-Based Procurement Training TDM - Shalon Brown (BTO) Shanti Pless National Renewable Energy Laboratory Shanti.Pless@nrel.gov 303-384-6365 April 4, 2013 2 | Building Technologies Office eere.energy.gov Project Definition Replicating NREL/DOE procurement process successes in reaching 50% building energy savings at typical construction costs, by: - Creating a how-to guide that outlines the entire acquisition process, including: setting a building energy requirement, project

278

Building Technologies Office: Commercial Building Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

on Twitter Bookmark Building Technologies Office: Commercial Building Activities on Google Bookmark Building Technologies Office: Commercial Building Activities on Delicious...

279

Building Technologies Office: Buildings Performance Database  

NLE Websites -- All DOE Office Websites (Extended Search)

on Twitter Bookmark Building Technologies Office: Buildings Performance Database on Google Bookmark Building Technologies Office: Buildings Performance Database on Delicious...

280

Final deactivation project report on the High Radiation Level Analytical Facility, Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S&M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S&M effort would be required to maintain the building safety envelope. Other than the minimal S&M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S&M until decommissioning activities begin.

NONE

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Around Buildings  

E-Print Network (OSTI)

Around Buildings W h y startw i t h buildings and w o r k o u t wa r d ? For one, buildings are difficult t o a v o i d these

Treib, Marc

1987-01-01T23:59:59.000Z

282

BUILDING INSPECTION Building, Infrastructure, Transportation  

E-Print Network (OSTI)

BUILDING INSPECTION Building, Infrastructure, Transportation City of Redwood City 1017 Middlefield Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per of Redwood City enforce the current Title 24 Building Energy Efficiency Standards as part

283

Rooftop Unit Network Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network Project Network Project RTU Network Project Michael Brambley, Ph.D. Pacific Northwest National Laboratory Michael.Brambley@pnnl.gov (509) 375-6875 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Packaged air conditioners and heat pumps (RTUs) are used in about 58% of all cooled commercial buildings, serving about 69% of the cooled commercial building floor space (EIA 2003) - Navigant estimates packaged A/C uses 0.9 quads of electricity for cooling annually and

284

Building Technologies Office: Harmonization of Wireless Dimming Lighting  

NLE Websites -- All DOE Office Websites (Extended Search)

Harmonization of Harmonization of Wireless Dimming Lighting Controls Research Project to someone by E-mail Share Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Facebook Tweet about Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Twitter Bookmark Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Google Bookmark Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Delicious Rank Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Digg Find More places to share Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on

285

Building Technologies Office: Energy-Efficient Window Air Conditioner  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy-Efficient Window Energy-Efficient Window Air Conditioner Ratings Research Project to someone by E-mail Share Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Facebook Tweet about Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Twitter Bookmark Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Google Bookmark Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Delicious Rank Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Digg Find More places to share Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on

286

Guidelines for Intelligent Asset Replacement  

Science Conference Proceedings (OSTI)

EPRI8217s asset management research focuses on developing a rational basis for selecting repair or replacement options for specific classes of equipment by balancing the risks of equipment failure against the costs of continued maintenance or capital replacement. This report, the fourth report on guidelines for asset replacement, discusses methods for making decisions about wood poles. It significantly enhances a prior report on this subject by explicitly modeling pole degradation, inspection and test ef...

2006-12-18T23:59:59.000Z

287

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

288

Education Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Education Education Characteristics by Activity... Education Education buildings are buildings used for academic or technical classroom instruction, such as elementary, middle, or high schools, and classroom buildings on college or university campuses. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Education Buildings... Seventy percent of education buildings were part of a multibuilding campus. Education buildings in the South and West were smaller, on average, than those in the Northeast and Midwest. Almost two-thirds of education buildings were government owned, and of these, over three-fourths were owned by a local government. Tables: Buildings and Size Data by Basic Characteristics Establishment, Employment, and Age Data by Characteristics

289

Lodging Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

a nursing home, assisted living center, or other residential care building a half-way house some other type of lodging Lodging Buildings by Subcategory Figure showing lodging...

290

Commercial Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Exterior glass windows of office tower Commercial Buildings Commercial building systems research explores different ways to integrate the efforts of research in windows, lighting,...

291

EERE: Buildings  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Commercial Building Initiative works with commercial builders and owners to reduce energy use and optimize building performance, comfort, and savings. Solid-State Lighting...

292

HALON REPLACEMENT RESEARCH - A HISTORICAL ...  

Science Conference Proceedings (OSTI)

... Tapscott, RE, Progress Report on Alternatives and Replacements for Halons, E&P Forum Halon Phase-Out Workshop, London, United Kingdom ...

2011-10-11T23:59:59.000Z

293

Energy efficiency and appliance replacement  

E-Print Network (OSTI)

1004 ENERGY EFFICIENCY AND APPLIANCE REPLACEMENT Jeffrey T.adopt energy efficient appliances, even though the financialmix of energyusing appliances predicts that under plausible

LaFrance, Jeffrey T.

2005-01-01T23:59:59.000Z

294

Commercial Reference Buildings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Buildings » Research Projects » Commercial Reference Buildings » Research Projects » Commercial Reference Buildings Commercial Reference Buildings The U.S. Department of Energy (DOE), in conjunction with three of its national laboratories, developed commercial reference buildings, formerly known as commercial building benchmark models. These reference buildings play a critical role in the program's energy modeling software research by providing complete descriptions for whole building energy analysis using EnergyPlus simulation software. There are 16 building types that represent approximately 70% of the commercial buildings in the U.S., according to the report published by the National Renewable Energy Laboratory titled U.S. Department of Energy Commercial Reference Building Models of the National Building Stock. These

295

Property:HPBD/ProjectId | Open Energy Information  

Open Energy Info (EERE)

ProjectId ProjectId Jump to: navigation, search This is a property of type Number. Pages using the property "HPBD/ProjectId" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + 203 + High Performance Buildings Database + 358 + High Performance Buildings Database + 71 + High Performance Buildings Database + 833 + High Performance Buildings Database + 247 + High Performance Buildings Database + 20 + High Performance Buildings Database + 498 + High Performance Buildings Database + 132 + High Performance Buildings Database + 194 + High Performance Buildings Database + 323 + High Performance Buildings Database + 50 + High Performance Buildings Database + 785 + High Performance Buildings Database + 223 +

296

Building Energy Code | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Energy Code Building Energy Code Building Energy Code < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Massachusetts Program Type Building Energy Code Provider State Board of Building Regulations and Standards ''Much of the information presented in this summary is drawn from the U.S. Department of Energy's (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed information about building energy codes, visit the [http://www.energycodes.gov/states/ DOE] and [http://bcap-ocean.org/ BCAP] websites.'' The Massachusetts Board of Building Regulations and Standards has authority

297

Buildings Performance Database Helps Building Owners, Investors...  

NLE Websites -- All DOE Office Websites (Extended Search)

Buildings Performance Database Helps Building Owners, Investors Evaluate Energy Efficient Buildings Buildings Performance Database June 2013 A new database of building features and...

298

Building Technologies Office: Buildings NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

NewsDetail on Twitter Bookmark Building Technologies Office: Buildings NewsDetail on Google Bookmark Building Technologies Office: Buildings NewsDetail on Delicious Rank Building...

299

Building Technologies Office: Residential Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

building sector by at least 50%. Photo of people walking around a new home. Visitors Tour Solar Decathlon Homes Featuring the Latest in Energy Efficient Building Technology...

300

Federal Energy Management Program: Building Life Cycle Cost Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis; Non-Energy Project BLCC conducts economic analyses by evaluating the relative cost effectiveness of alternative buildings and building-related systems or components....

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Worldwide Status of Energy Standards for Buildings - Appendices  

E-Print Network (OSTI)

on Energy Conservation in Buildings) Dept of public WorksBuilding Research Center, Department of Public Works Foreign development agency: ASEAN-US Energy project, Energy Conservation

Janda, K.B.

2008-01-01T23:59:59.000Z

302

Buildings Energy Data Book: 9.2 LEED  

Buildings Energy Data Book (EERE)

and two buildings whose states were not listed. Pilots are not included. United States Green Building Council, http:www.usgbc.orgLEEDProjectCertifiedProjectList.aspx,...

303

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

with commercial building microgrids Michael Stadler, Gonalocommercial building microgrids *) Michael Stadler GonaloSVOW), http://der.lbl.gov/microgrids-lbnl/current-project-

Stadler, Michael

2011-01-01T23:59:59.000Z

304

Replace Kilogram Standard? NIST Weighs Options  

Science Conference Proceedings (OSTI)

... Replace Kilogram Standard? ... For some time, scientists have considered replacing the kilogram mass standard with a natural constant. ...

305

Solid-State Lighting: Webinar: The L Prize-Winning LED A19Replacement...  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building OwnersOperators Can Expect in 2012 to someone by E-mail Share Solid-State Lighting: Webinar: The L...

306

Building Energy Modeling Library  

NLE Websites -- All DOE Office Websites (Extended Search)

Modeling (BEM) Modeling (BEM) Library TDM - Amir Roth Ellen Franconi Rocky Mountain Institute Efranconi@rmi.org 303-567-8609 April 2, 2013 Photo by : Dennis Schroeder, NREL 23250 2 | Building Technologies Office eere.energy.gov Project Overview Building Energy Modeling (BEM) Library * Define and develop a best-practices BEM knowledge repository to improve modeling consistency and address training gaps * Raise energy modeling industry "techniques" to the same

307

Buildings Performance Metrics Terminology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy's Commercial Building Initiative Page 1 Energy's Commercial Building Initiative Page 1 January 2009 Buildings Performance Metrics Terminology To clarify how the terms are used in the Department of Energy's Performance Metrics Research Project, a list of terms related to performance metrics are defined and include examples and comments. Visit www.commercialbuildings.energy.gov/performance_metrics.html to learn more. Baseline - a standard reference case used as a basis for comparison Examples: a simulation model of an ASHRAE 90.1 compliant building, control building, measurement of energy consumption prior to application of an energy conservation measure Comments: Establishing a clearly defined baseline very important and is often the most difficult task. Defining a repeatable baseline is essential if the work is to be compared to results of other

308

Building Technologies Office: High Efficiency, Low Emission Supermarket  

NLE Websites -- All DOE Office Websites (Extended Search)

High Efficiency, Low High Efficiency, Low Emission Supermarket Refrigeration Research Project to someone by E-mail Share Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Facebook Tweet about Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Twitter Bookmark Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Google Bookmark Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Delicious Rank Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Digg Find More places to share Building Technologies Office: High

309

High Performance Building Standards in State Buildings | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High Performance Building Standards in State Buildings High Performance Building Standards in State Buildings High Performance Building Standards in State Buildings < Back Eligibility State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Solar Lighting Windows, Doors, & Skylights Heating Water Water Heating Wind Program Info State Oklahoma Program Type Energy Standards for Public Buildings Provider Oklahoma Department of Central Services In June 2008, the governor of Oklahoma signed [http://webserver1.lsb.state.ok.us/2007-08bills/HB/hb3394_enr.rtf HB 3394] requiring the state to develop a high-performance building certification program for state construction and renovation projects. The standard, which

310

Service Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Service Service Characteristics by Activity... Service Service buildings are those in which some type of service is provided, other than food service or retail sales of goods. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Service Buildings... Most service buildings were small, with almost ninety percent between 1,001 and 10,000 square feet. Tables: Buildings and Size Data by Basic Characteristics Establishment, Employment, and Age Data by Characteristics Number of Service Buildings by Predominant Building Size Category Figure showing number of service buildings by size. If you need assistance viewing this page, please contact 202-586-8800. Equipment Table: Buildings, Size, and Age Data by Equipment Types Predominant Heating Equipment Types in Service Buildings

311

Commercial Building Activities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Activities Building Activities Commercial Building Activities The Building Technologies Office commercial buildings effort researches and deploys advanced technologies and systems to reduce energy consumption in commercial buildings. Industry partners and national laboratories help identify market needs and solutions to accelerate the development of highly energy-efficient buildings. This page outlines some of BTO's key projects. 179d Tax Calculator The 179d Calculator can help determine whether improvements qualify for a Federal tax deduction, and allows owners and managers to estimate energy cost savings of efficiency improvements. Advanced Energy Design Guides These recommendations can help designers achieve between 30% and 50% energy savings in a new commercial building.

312

Building Energy Code | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Energy Code Building Energy Code Building Energy Code < Back Eligibility Commercial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Ohio Program Type Building Energy Code Provider Ohio Department of Commerce ''Much of the information presented in this summary is drawn from the U.S. Department of Energy's (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed information about building energy codes, visit the [http://www.energycodes.gov/states/ DOE] and [http://bcap-ocean.org/ BCAP] websites.'' The Board of Building Standards is the primary state agency that protects

313

Mercantile Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Mercantile Mercantile Characteristics by Activity... Mercantile Mercantile buildings are those used for the sale and display of goods other than food (buildings used for the sales of food are classified as food sales). This category includes enclosed malls and strip shopping centers. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Mercantile Buildings... Almost half of all mercantile buildings were less than 5,000 square feet. Roughly two-thirds of mercantile buildings housed only one establishment. Another 20 percent housed between two and five establishments, and the remaining 12 percent housed six or more establishments. Tables: Buildings and Size Data by Basic Characteristics Establishment, Employment, and Age Data by Characteristics

314

Other Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Other Other Characteristics by Activity... Other Other buildings are those that do not fit into any of the specifically named categories. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Other Buildings... Other buildings include airplane hangars; laboratories; buildings that are industrial or agricultural with some retail space; buildings having several different commercial activities that, together, comprise 50 percent or more of the floorspace, but whose largest single activity is agricultural, industrial/manufacturing, or residential; and all other miscellaneous buildings that do not fit into any other CBECS category. Since these activities are so diverse, the data are probably less meaningful than for other activities; they are provided here to complete

315

Building Energy Code | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presented in this summary is drawn from the U.S. Department of Energy's (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed...

316

Ad Building demolition, recycling completed  

NLE Websites -- All DOE Office Websites (Extended Search)

Ad Building demolition, recycling completed Ad Building demolition, recycling completed Ad Building demolition, recycling completed Demolition of the Administration Building helps Los Alamos meet an NNSA directive to reduce its structural footprint, modernize its infrastructure, and provide workers with safe, energy-efficient facilities. October 11, 2011 Demolition of the administration building Demolition of the Administration Building Contact Steve Sandoval Communications Office (505) 665-9206 Email Project finished under budget, ahead of schedule LOS ALAMOS, New Mexico, October 11, 2011-Los Alamos National Laboratory has completed demolition of its former Administration Building. Demolition of the 316,500-square-foot building that was home to seven Laboratory directors was completed five months ahead of the original schedule and

317

Better Buildings Progress Report 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report 2012 Report 2012 BETTER BUILDINGS PROGRESS REPORT 2012 Better Buildings Progress Report 2012 Executive Summary 1 Better Buildings - Goals and Strategies 2 Better Buildings Initiative Timeline 4 Developing Innovative, Replicable Solutions with Market Leaders 6 Making Energy Efficiency Investment Easier 13 Developing a Skilled Clean Energy Workforce 19 Federal Leadership by Example 21 Appendix A. Better Buildings Challenge Participant List 23 Appendix B. Better Buildings Challenge Showcase Projects 24 Appendix C. Better Buildings Challenge Solutions 25 BETTER BUILDINGS PROGRESS REPORT 2012 1 Energy efficiency is widely recognized as a cost-effective-but underutilized-strategy for reducing energy costs while increasing energy security, improving our environment, and contributing to the American job

318

Building Energy Conservation in China  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Conservation in China Building Energy Conservation in China Speaker(s): Zhang Fulin Date: January 29, 2013 - 11:15am Location: 90-3122 Seminar Host/Point of Contact: Haley Gilbert Mr. Zhang Fulin is a Senior Engineer and Director of the Division of Energy Efficiency in Buildings, Department of Energy Efficiency in Buildings and Science &Technology of the Ministry of Housing and Urban-Rural Development (MOHURD) in China. He is tasked with developing China building energy conservation policies and regulations and is responsible for the approval of major China building energy efficiency projects. Mr. Zhang has been working in the field of building energy efficiency for more than two decades. He will speak about current laws and regulations governing building energy efficiency practice in China,

319

Energy Efficiency Improvements to Wundar Hall, a Historic Building on the Concordia Campus, Milwaukee, Wisconsin  

Science Conference Proceedings (OSTI)

The Forest County Potawatomi Community (??FCPC? or ??Community?) implemented energy efficiency improvements to revitalize Wundar Hall, a 34,000 square foot (??SF?) building that was formerly used as a dormitory and is listed on the National Registry of Historic Places, into an office building. Wundar Hall is the first of many architecturally and historically significant buildings that the Community hopes to renovate at the former Concordia College campus, property on the near west side of Milwaukee that was taken into trust for the Community by the United States on July 10, 1990 (collectively, the ??Concordia Trust Property?). As part of this project, which was conducted with assistance from the Department of Energy??s Tribal Energy Program (??TEP?), the Community updated and/or replaced the building envelope, mechanical systems, the plumbing system, the electrical infrastructure, and building control systems. The project is expected to reduce the building??s natural gas consumption by 58% and the electricity consumption by 55%. In addition, the project was designed to act as a catalyst to further renovation of the Concordia Trust Property and the neighborhood. The City of Milwaukee has identified redevelopment of the Concordia Trust Property as a ??Catalytic Project? for revitalizing the near west side. The Tribe envisions a revitalized, mixed-use campus of community services, education, and economic development??providing services to the Indian community and jobs to the neighborhood.

Karman, Nathan

2012-11-29T23:59:59.000Z

320

Wafer Replacement Cluster Tool (Presentation);  

DOE Green Energy (OSTI)

This presentation on wafer replacement cluster tool discusses: (1) Platform for advanced R and D toward SAI 2015 cost goal--crystal silicon PV at area costs closer to amorphous Si PV, it's 15% efficiency, inexpensive substrate, and moderate temperature processing (<800 C); (2) Why silicon?--industrial and knowledge base, abundant and environmentally benign, market acceptance, and good efficiency; and (3) Why replace wafers?--expensive, high embedded energy content, and uses 50-100 times more silicon than needed.

Branz, H. M.

2008-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Buildings*","Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

8. Primary Space-Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" 8. Primary Space-Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Buildings with Space Heating","Primary Space-Heating Energy Source Used a" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat" "All Buildings* ...............",4645,3982,1258,1999,282,63 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,2100,699,955,171,"Q" "5,001 to 10,000 ..............",889,782,233,409,58,"Q" "10,001 to 25,000 .............",738,659,211,372,32,"Q" "25,001 to 50,000 .............",241,225,63,140,8,9

322

Buildings*","Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

6. Space Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" 6. Space Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Buildings with Space Heating","Space-Heating Energy Sources Used (more than one may apply)" ,,,"Elec- tricity","Natural Gas","Fuel Oil","District Heat","Propane","Other a" "All Buildings* ...............",4645,3982,1766,2165,360,65,372,113 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,2100,888,1013,196,"Q",243,72 "5,001 to 10,000 ..............",889,782,349,450,86,"Q",72,"Q" "10,001 to 25,000 .............",738,659,311,409,46,18,38,"Q"

323

Buildings*","Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

1. Water-Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" 1. Water-Heating Energy Sources, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Buildings with Water Heating","Water-Heating Energy Sources Used (more than one may apply)" ,,,"Elec- tricity","Natural Gas","Fuel Oil","District Heat","Propane" "All Buildings* ...............",4645,3472,1910,1445,94,27,128 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,1715,1020,617,41,"N",66 "5,001 to 10,000 ..............",889,725,386,307,"Q","Q",27 "10,001 to 25,000 .............",738,607,301,285,16,"Q",27

324

Renewable Energy Applications for Existing Buildings: Preprint  

SciTech Connect

This paper introduces technical opportunities, means, and methods for incorporating renewable energy (RE) technologies into building designs and operations. It provides an overview of RE resources and available technologies used successfully to offset building electrical and thermal energy loads. Methods for applying these technologies in buildings and the role of building energy efficiency in successful RE projects are addressed along with tips for implementing successful RE projects.

Hayter, S. J.; Kandt, A.

2011-08-01T23:59:59.000Z

325

Replaces EIA-459E OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 (04-94) Replaces EIA-459E OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MANAGEMENT SUMMARY REPORT Page of Public reporting burden for this collection of information is estimated to average 3.38 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project

326

Vacant Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

of 275 thousand cubic feet per building, 29.9 cubic feet per square foot, at an average cost of 475 per thousand cubic feet. Energy Consumption in Vacant Buildings by Energy...

327

Building America  

SciTech Connect

IBACOS researched the constructability and viability issues of using high performance windows as one component of a larger approach to building houses that achieve the Building America 70% energy savings target.

Brad Oberg

2010-12-31T23:59:59.000Z

328

The Cost of Enforcing Building Energy Codes: Phase 1  

E-Print Network (OSTI)

Improving Energy Code Compliance in New Mexico's Buildings.Improving Energy Code Compliance in New Mexico's Buildings.Energy Code Ambassadors Program. Building Codes Assistance Project and New Mexico

Williams, Alison

2013-01-01T23:59:59.000Z

329

Prototype Buildings  

Science Conference Proceedings (OSTI)

... The SDC D buildings, designed for Seattle, Washington, used special moment frames (SMFs) with reduced beam section (RBS) connections. ...

2013-02-08T23:59:59.000Z

330

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

331

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

332

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

333

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

334

Better Buildings Neighborhood Program: Better Buildings Neighborhood  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Better Buildings Neighborhood Program Search Better Buildings Neighborhood Program Search Search Help Better Buildings Neighborhood Program HOME ABOUT BETTER BUILDINGS PARTNERS INNOVATIONS RUN A PROGRAM TOOLS & RESOURCES NEWS EERE » Building Technologies Office » Better Buildings Neighborhood Program Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Better Buildings Neighborhood Program to someone by E-mail Share Better Buildings Neighborhood Program: Better Buildings Neighborhood Program on Facebook Tweet about Better Buildings Neighborhood Program: Better Buildings Neighborhood Program on Twitter Bookmark Better Buildings Neighborhood Program: Better Buildings Neighborhood Program on Google Bookmark Better Buildings Neighborhood Program: Better Buildings Neighborhood Program on Delicious

335

Building Technologies Office: Advancing Building Energy Codes  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Codes Building Energy Codes Printable Version Share this resource Send a link to Building Technologies Office: Advancing Building Energy Codes to someone by E-mail Share Building Technologies Office: Advancing Building Energy Codes on Facebook Tweet about Building Technologies Office: Advancing Building Energy Codes on Twitter Bookmark Building Technologies Office: Advancing Building Energy Codes on Google Bookmark Building Technologies Office: Advancing Building Energy Codes on Delicious Rank Building Technologies Office: Advancing Building Energy Codes on Digg Find More places to share Building Technologies Office: Advancing Building Energy Codes on AddThis.com... Popular Links Success Stories Previous Next Lighten Energy Loads with System Design. Warming Up to Pump Heat.

336

Building Technologies Office: Building America Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Building America Building America Meetings to someone by E-mail Share Building Technologies Office: Building America Meetings on Facebook Tweet about Building Technologies Office: Building America Meetings on Twitter Bookmark Building Technologies Office: Building America Meetings on Google Bookmark Building Technologies Office: Building America Meetings on Delicious Rank Building Technologies Office: Building America Meetings on Digg Find More places to share Building Technologies Office: Building America Meetings on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR

337

Cranfield University Building 41 (Stafford Cripps Building)  

E-Print Network (OSTI)

Cranfield University Building 41 (Stafford Cripps Building) Building 41, formally known as the Stafford Cripps Building, has been transformed into a new Learning and Teaching Facility. Proposed ground

338

Building Technologies Office: Residential Building Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Building Residential Building Activities to someone by E-mail Share Building Technologies Office: Residential Building Activities on Facebook Tweet about Building Technologies Office: Residential Building Activities on Twitter Bookmark Building Technologies Office: Residential Building Activities on Google Bookmark Building Technologies Office: Residential Building Activities on Delicious Rank Building Technologies Office: Residential Building Activities on Digg Find More places to share Building Technologies Office: Residential Building Activities on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home Guidelines for Home Energy Professionals

339

Better Buildings Neighborhood Program: Better Buildings Residential...  

NLE Websites -- All DOE Office Websites (Extended Search)

Better Buildings Residential Network to someone by E-mail Share Better Buildings Neighborhood Program: Better Buildings Residential Network on Facebook Tweet about Better Buildings...

340

Building Technologies Office: Better Buildings Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

on Twitter Bookmark Building Technologies Office: Better Buildings Challenge on Google Bookmark Building Technologies Office: Better Buildings Challenge on Delicious Rank...

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Building Technologies Office: Building Energy Optimization Software  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Building Energy Optimization Software to someone by E-mail Share Building Technologies Office: Building Energy Optimization Software on Facebook Tweet about Building Technologies Office: Building Energy Optimization Software on Twitter Bookmark Building Technologies Office: Building Energy Optimization Software on Google Bookmark Building Technologies Office: Building Energy Optimization Software on Delicious Rank Building Technologies Office: Building Energy Optimization Software on Digg Find More places to share Building Technologies Office: Building Energy Optimization Software on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance

342

Building the Senceive System  

Science Conference Proceedings (OSTI)

The conception and development of pervasive systems, i.e, the systems which will be used in pervasive computing environments, involve interdisciplinary team work. Apparently, the team consists of people with a diverse research background and expertise. ... Keywords: activity recognition, building a sensing system, complex system design, network configuration, project work, wireless sensor networks

Waltenegus Dargie; Alexander Schill

2009-05-01T23:59:59.000Z

343

Building Science  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Science Science The "Enclosure" Joseph Lstiburek, Ph.D., P.Eng, ASHRAE Fellow www.buildingscience.com * Control heat flow * Control airflow * Control water vapor flow * Control rain * Control ground water * Control light and solar radiation * Control noise and vibrations * Control contaminants, environmental hazards and odors * Control insects, rodents and vermin * Control fire * Provide strength and rigidity * Be durable * Be aesthetically pleasing * Be economical Building Science Corporation Joseph Lstiburek 2 Water Control Layer Air Control Layer Vapor Control Layer Thermal Control Layer Building Science Corporation Joseph Lstiburek 3 Building Science Corporation Joseph Lstiburek 4 Building Science Corporation Joseph Lstiburek 5 Building Science Corporation

344

Buildings Blog  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

blog Office of Energy Efficiency & blog Office of Energy Efficiency & Renewable Energy Forrestal Building 1000 Independence Avenue, SW Washington, DC 20585 en EnergyPlus Boosts Building Efficiency with Help from Autodesk http://energy.gov/eere/articles/energyplus-boosts-building-efficiency-help-autodesk building-efficiency-help-autodesk" class="title-link">EnergyPlus Boosts Building Efficiency with Help from Autodesk

345

Building Technologies Office: Highly Energy Efficient Wall Systems...  

NLE Websites -- All DOE Office Websites (Extended Search)

Highly Energy Efficient Wall Systems Research Project to someone by E-mail Share Building Technologies Office: Highly Energy Efficient Wall Systems Research Project on Facebook...

346

Oakland University Human Health Science Building Geothermal Heat...  

Open Energy Info (EERE)

Last modified on July 22, 2011. Project Title Oakland University Human Health Science Building Geothermal Heat Pump Systems Project Type Topic 1 Recovery Act - Geothermal...

347

Residential Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Exterior and interior of apartment building Exterior and interior of apartment building Residential Buildings The study of ventilation in residential buildings is aimed at understanding the role that air leakage, infiltration, mechanical ventilation, natural ventilation and building use have on providing acceptable indoor air quality so that energy and related costs can be minimized without negatively impacting indoor air quality. Risks to human health and safety caused by inappropriate changes to ventilation and air tightness can be a major barrier to achieving high performance buildings and must be considered.This research area focuses primarily on residential and other small buildings where the interaction of the envelope is important and energy costs are dominated by space conditioning energy rather than air

348

Step 5: Commission the building | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Specify detailed commissioning activities in the project contracts. Ensure that your architect or engineer transfers technical documents to the building's operations and...

349

DOE Hydrogen Analysis Repository: Building Energy Optimization...  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy Optimization (BEopt) Software Project ID: 105 Principal Investigator: Craig Christensen Brief Description: BEopt is a computer program designed to find optimal...

350

Building Energy Software Tools Directory: Load Express  

NLE Websites -- All DOE Office Websites (Extended Search)

Create project files with Load Express in just 4 easy steps. Select a weather profile, enter simulation parameters, define the zonesrooms in the building and create air handler...

351

Building Energy Software Tools Directory: Acoustics Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Acoustics Program Developed to help designers accurately model the sound level reaching building tenant's ears, the Trane Acoustics Program (TAP) "projects" equipment sound power...

352

Whole Building Performance-Based Procurement Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Shanti.Pless@nrel.gov 303-384-6365 April 4, 2013 2 | Building Technologies Office eere.energy.gov Project Definition Replicating NRELDOE procurement process successes in...

353

Building America: Full-Text Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Printable Version Bookmark and Share Home About Research Projects Building Energy Optimization Efficiency Measures & Costs House Simulation Protocols Meetings...

354

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

355

Microsoft Word - Roza_Transformer_Replacement_CX_Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Patricia Smith Project Manager KEWU-4 Proposed Action: Replace two broken transformers near the Roza Dam adult trap facility Budget Information: Work Order #188534, Task #1 Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: Roza Diversion Dam Adult Trap Facility , Township 15 North, Range 19 East,

356

CALIFORNIA ENERGY Large HVAC Building  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION Large HVAC Building Survey Information Database of Buildings over 100 Design of Large Commercial HVAC Systems research project, one of six research elements in the Integrated Design of Large Commercial HVAC Systems Integrated Design of Small Commercial HVAC Systems Integrated

357

Building Technologies Office: Commercial Building Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research Photo of NREL senior engineer Eric Kozubal examining a prototype airflow channel of the desiccant enhanced evaporative (DEVap) air conditioner with a graph superimposed on the photo that shows how hot humid air, in red, changes to cool dry air, in blue, as the air passes through the DEVap core. National Renewable Energy Laboratory senior engineer Eric Kozubal examines a prototype airflow channel of the desiccant enhanced evaporative (DEVap) air conditioner, an example of the advanced technology research the Building Technologies Office supports. The superimposed graph shows hot humid air (red) changing to cool dry air (blue) as the air passes through the DEVap core. Credit: Pat Corkery, NREL PIX 17437 The Building Technologies Office (BTO) researches advanced technologies, systems, tools, and strategies to improve the energy performance of commercial buildings. Industry partners and national laboratories help identify market needs and solutions that accelerate the development of highly energy-efficient buildings. This page outlines some of BTO's principal research projects. For more BTO research results, visit the Commercial Buildings Resource Database.

358

Sprinkler Head Replacement (4586), 4/24/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sprinkler Head Replacement Projects (4586) Sprinkler Head Replacement Projects (4586) Program or Field Office: Y-12 Site Office Location(s) (Citv/Countv/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is to replace approximately 1 ,300 sprinkler heads upgrade fire protection systems. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D. To fit within the classes of actions listed in 10 CFR Part 1021, Subpart D, Appendix B, a proposal must be one that would not: (1) threaten

359

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

360

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

362

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

363

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

364

Building Technologies Office: Open-Protocol Platform for Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Open-Protocol Platform Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project to someone by E-mail Share Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Facebook Tweet about Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Twitter Bookmark Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Google Bookmark Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Delicious Rank Building Technologies Office: Open-Protocol Platform for

365

Building Technologies Office: Commercial Reference Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Reference Commercial Reference Buildings to someone by E-mail Share Building Technologies Office: Commercial Reference Buildings on Facebook Tweet about Building Technologies Office: Commercial Reference Buildings on Twitter Bookmark Building Technologies Office: Commercial Reference Buildings on Google Bookmark Building Technologies Office: Commercial Reference Buildings on Delicious Rank Building Technologies Office: Commercial Reference Buildings on Digg Find More places to share Building Technologies Office: Commercial Reference Buildings on AddThis.com... About Take Action to Save Energy Activities 179d Tax Calculator Advanced Energy Design Guides Advanced Energy Retrofit Guides Building Energy Data Exchange Specification Buildings Performance Database Data Centers Energy Asset Score

366

Building Technologies Office: Buildings to Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Buildings to Grid Buildings to Grid Integration to someone by E-mail Share Building Technologies Office: Buildings to Grid Integration on Facebook Tweet about Building Technologies Office: Buildings to Grid Integration on Twitter Bookmark Building Technologies Office: Buildings to Grid Integration on Google Bookmark Building Technologies Office: Buildings to Grid Integration on Delicious Rank Building Technologies Office: Buildings to Grid Integration on Digg Find More places to share Building Technologies Office: Buildings to Grid Integration on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research Water Heating Research Lighting Research

367

Building America Efficient Solutions for Existing Homes Case Study: Habitat for Humanity of Palm Beach County, Lake Worth, Florida  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Description Project Description Habitat for Humanity of Palm Beach County, working with Building America researchers from Pacific Northwest National Laboratory and the Florida Solar Energy Center, upgraded this previously unoccupied 1996 home in Lake Worth, Florida to achieve an estimated 39% improvement in energy efficiency. The 1,573-ft 2 slab-on-grade, single- family home received extensive energy upgrades during its conversion to affordable and efficient housing for low-income families. By replacing the home's water heater, using compact fluorescent lamps (CFLs), reducing air infiltration, adding more ceiling insulation, and installing a central air conditioner, the home's annual energy bills are

368

Plant Process Computer Upgrade Guidelines, Volume 1: Replacement Guidelines  

Science Conference Proceedings (OSTI)

The gradual obsolescence of the original plant process computers at nuclear power plants decreases their effectiveness in supporting plant operation and maintenance. This project, based on the practical experience of utility personnel, presents guidelines on plant process computer replacement planning and implementation.

1993-01-01T23:59:59.000Z

369

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

370

Building Energy Code | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Energy Code Building Energy Code Building Energy Code < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Alternative Fuel Vehicles Hydrogen & Fuel Cells Heating Buying & Making Electricity Water Water Heating Wind Program Info State Connecticut Program Type Building Energy Code Provider Connecticut Office of Policy and Management ''Much of the information presented in this summary is drawn from the U.S. Department of Energy's (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed information about building energy codes, visit the [http://www.energycodes.gov/states/

371

Building Energy Code | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Energy Code Building Energy Code Building Energy Code < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Alabama Program Type Building Energy Code Provider Alabama Department of Economic and Community Affairs ''Much of the information presented in this summary is drawn from the U.S. Department of Energy's (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed information about building energy codes, visit the [http://www.energycodes.gov/states/ DOE] and [http://bcap-ocean.org/ BCAP] web sites.'' Legislation passed in March 2010 authorized the Alabama Energy and

372

Solar Project Solutions | Open Energy Information  

Open Energy Info (EERE)

Solar Project Solutions Jump to: navigation, search Name Solar Project Solutions Place California Sector Solar Product US-based JV to build solar-power plants in California....

373

BuildingPI: A future tool for building life cycle analysis  

SciTech Connect

Traditionally building simulation models are used at the design phase of a building project. These models are used to optimize various design alternatives, reduce energy consumption and cost. Building performance assessment for the operational phase of a buildings life cycle is sporadic, typically working from historical metered data and focusing on bulk energy assessment. Building Management Systems (BMS) do not explicitly incorporate feedback to the design phase or account for any changes, which have been made to building layout or fabric during construction. This paper discusses a proposal to develop an Industry Foundation Classes (IFC) compliant data visualization tool Building Performance Indicator (BuildingPI) for performance metric and performance effectiveness ratio evaluation.

O' Donnell, James; Morrissey, Elmer; Keane, Marcus; Bazjanac,Vladimir

2004-03-29T23:59:59.000Z

374

High Performance Sustainable Building Design RM  

Energy.gov (U.S. Department of Energy (DOE))

The High Performance Sustainable Building Design (HPSBD) Review Module (RM) is a tool that assists the DOE federal project review teams in evaluating the technical sufficiency for projects that may...

375

Kansas City Plant, Construction Worker Screening Projects | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kansas City Plant, Construction Worker Screening Projects Kansas City Plant, Construction Worker Screening Projects Project Name: Building Trades National Medicl Screening Program...

376

Testing of Replacement Bag Material  

Science Conference Proceedings (OSTI)

Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties.

Laurinat, J.E.

1998-11-03T23:59:59.000Z

377

Sampling streaming data with replacement  

Science Conference Proceedings (OSTI)

Simple random sampling is a widely accepted basis for estimation from a population. When data come as a stream, the total population size continuously grows and only one pass through the data is possible. Reservoir sampling is a method of maintaining ... Keywords: Data stream mining, Random sampling with replacement, Reservoir sampling

Byung-Hoon Park; George Ostrouchov; Nagiza F. Samatova

2007-10-01T23:59:59.000Z

378

Virtual building environments (VBE) - Applying information modeling to buildings  

SciTech Connect

A Virtual Building Environment (VBE) is a ''place'' where building industry project staffs can get help in creating Building Information Models (BIM) and in the use of virtual buildings. It consists of a group of industry software that is operated by industry experts who are also experts in the use of that software. The purpose of a VBE is to facilitate expert use of appropriate software applications in conjunction with each other to efficiently support multidisciplinary work. This paper defines BIM and virtual buildings, and describes VBE objectives, set-up and characteristics of operation. It informs about the VBE Initiative and the benefits from a couple of early VBE projects.

Bazjanac, Vladimir

2004-06-21T23:59:59.000Z

379

Office Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Since they comprised 18 percent of commercial floorspace, this means that their total energy intensity was just slightly above average. Office buildings predominantly used...

380

Better Buildings Neighborhood Program: Better Buildings Partners  

NLE Websites -- All DOE Office Websites (Extended Search)

Better Better Buildings Partners to someone by E-mail Share Better Buildings Neighborhood Program: Better Buildings Partners on Facebook Tweet about Better Buildings Neighborhood Program: Better Buildings Partners on Twitter Bookmark Better Buildings Neighborhood Program: Better Buildings Partners on Google Bookmark Better Buildings Neighborhood Program: Better Buildings Partners on Delicious Rank Better Buildings Neighborhood Program: Better Buildings Partners on Digg Find More places to share Better Buildings Neighborhood Program: Better Buildings Partners on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA ME | MD | MA | MI | MO NE | NV | NH | NJ | NY

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Building Technologies Office: National Laboratories Supporting Building  

NLE Websites -- All DOE Office Websites (Extended Search)

National Laboratories National Laboratories Supporting Building America to someone by E-mail Share Building Technologies Office: National Laboratories Supporting Building America on Facebook Tweet about Building Technologies Office: National Laboratories Supporting Building America on Twitter Bookmark Building Technologies Office: National Laboratories Supporting Building America on Google Bookmark Building Technologies Office: National Laboratories Supporting Building America on Delicious Rank Building Technologies Office: National Laboratories Supporting Building America on Digg Find More places to share Building Technologies Office: National Laboratories Supporting Building America on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America

382

Building Design | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Design Building Design October 16, 2013 - 4:41pm Addthis Planning, Programming & Budgeting Building Design Project Construction Integrating renewable energy within Federal new construction or major renovations is critical at each phase of the design process. This overview covers considerations for renewable energy in the design phases of a construction project, including choosing the design team, the design team charrette, preliminary design, schematic design, design development, and construction documents. Information on this page introduces each of the design phases and provides a link to deeper-level information. Key Actions in Building Design Require specific renewable energy experience and skills for design team. Prioritize energy-related program

383

Chapter 8: Constructing the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Constructing the Building Developing a Construction Plan Writing Effective Construction Documents Safeguarding Design Goals During Construction Protecting the Site Low-Impact Construction Processes Protecting Indoor Air Quality Managing Construction Waste LANL | Chapter 8 Constructing the Building Developing a Construction Plan A high-performance design is a great achievement, but it doesn't mean much if the building isn't then built as intended. Getting from design to a completed project happens in two stages: 1) development of construction documents and 2) actual construction. To successfully implement a sustainable design, the construction docu- ments must accurately convey the specifics that deter- mine building performance, and they have to set up

384

Berkeley Lab - ARRA - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab Berkeley Lab Projects infrastructure Advanced Light Source User Support Building Total Project Cost: $35.1 million ARRA funding: $14.7 million The Advanced Light Source (ALS) User Support Building is a three-story, 30,928 gross-square-foot building that will house user-support operations at the ALS. It will include office and lab space for some 80 researchers. The $35-million project is funded by the DOE Office of Science. It will house experiment assembly spaces, conference rooms, and labs. The project is scheduled to be completed in 2011. Go here for more information. Bevatron demolition Total Project Cost: $50 million ARRA funding: $14.3 million Building 51, which houses the Bevatron, is an approximately 125,000 gross-square-foot, steel-frame structure built in the early 1950s. The

385

Hawaii Zuteck Rotor Project: Compilation of project reports  

DOE Green Energy (OSTI)

Summarizes project to design and build aileron retrofit blades for a 600 kW upwind, teetered rotor, full-span pitch control, horizontal-axis wind turbine.

Zuteck, M.D.; Miller, M.W.

1999-02-25T23:59:59.000Z

386

Replaces DOE F 5120.2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

700.2 700.2 (09-93) Replaces DOE F 5120.2 (02-90) edition may be used 1. INITIATOR: NAME & SIGNATURE ORGANIZATION CODE TELEPHONE NO. 2. PROJECT TITLE: 3. RESPONSIBLE ASSISTANT SECRETARY: 4. RESPONSIBLE OPERATIONS OFFICE: 5. M&O CONTRACTOR NAME: 6. WORK AUTHORIZATION NO.: FUNDS HEREBY AUTHORIZED 7. REVISION: B&R No. $000 13. WORK AUTHORIZED: (Brief description, schedule, results or products and reporting requirements, and any shifting of funds permitted within the work authorization): U.S. DEPARTMENT OF ENERGY Management & Operating (M&O) Contract Work Authorization WORK AUTHORIZATION 14. WORK AUTHORIZATION OFFICIAL: 15. OPERATIONS OFFICE OFFICIAL: 16. M&O CONTRACTOR OFFICIAL: NAME & SIGNATURE DATE 9. PERFORMANCE PERIOD COVERED BY

387

Semantic Building Blocks for 21st Century Building Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Semantic Building Blocks for 21st Century Building Engineering Semantic Building Blocks for 21st Century Building Engineering Speaker(s): Mark Palmer Date: October 2, 2009 - 12:00pm Location: 90-3122 The Building and Fire Research Laboratory (BFRL) of the National Institute of Standards and Technology (NIST) works to advance innovation and competitiveness of the U.S. building and fire safety industries. This presentation will introduce some of the work at BFRL to improve the design, construction and operation of the built environment and to advance the semantic infrastructure for integrated project design and delivery. With this context established, the presentation will examine research challenges and next steps for developing reference information models, industry data dictionaries and rule libraries for multidisciplinary collaboration to

388

FUSRAP Project  

Office of Legacy Management (LM)

Project Project 23b 14501 FUSRAP TECHNICAL BULLETIN N O . - R 3 v . L DATE: 1.2 9-99 SUBJECT : Pr.pec.d BY T r m L u d Approval Summary of the results for the Springdale characterization activities performed per WI-94-015, Rev. 0. TUO separate radiological characterization surveys and a limited cherical characterization survey were performed on the Springdale Site in Octcjer and December, 1993. The design of the radiological surveys were to supplement and define existing ORNL surveys. The limited cher.ica1 characterization survey was performed to assist in the completion of waste disposal paperwork. Radiological contamination is primarily ir. the 'belt cutting and belt fabrication'areas of the building with a small erea of contamination in the south end of the building. The chemiccl sac~le

389

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

390

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

391

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

392

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

393

Residential Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Residential Residential Buildings Residential buildings-such as single family homes, townhomes, condominiums, and apartment buildings-are all covered by the Residential Energy Consumption Survey (RECS). See the RECS home page for further information. However, buildings that offer multiple accomodations such as hotels, motels, inns, dormitories, fraternities, sororities, convents, monasteries, and nursing homes, residential care facilities are considered commercial buildings and are categorized in the CBECS as lodging. Specific questions may be directed to: Joelle Michaels joelle.michaels@eia.doe.gov CBECS Manager Release date: January 21, 2003 Page last modified: May 5, 2009 10:18 AM http://www.eia.gov/consumption/commercial/data/archive/cbecs/pba99/residential.html

394

Better Buildings Neighborhood Program: Better Buildings Residential  

NLE Websites -- All DOE Office Websites (Extended Search)

Better Better Buildings Residential Network-Current Members to someone by E-mail Share Better Buildings Neighborhood Program: Better Buildings Residential Network-Current Members on Facebook Tweet about Better Buildings Neighborhood Program: Better Buildings Residential Network-Current Members on Twitter Bookmark Better Buildings Neighborhood Program: Better Buildings Residential Network-Current Members on Google Bookmark Better Buildings Neighborhood Program: Better Buildings Residential Network-Current Members on Delicious Rank Better Buildings Neighborhood Program: Better Buildings Residential Network-Current Members on Digg Find More places to share Better Buildings Neighborhood Program: Better Buildings Residential Network-Current Members on AddThis.com...

395

Building Technologies Office: Commercial Building Partnership Opportunities  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Building Commercial Building Partnership Opportunities with the Department of Energy to someone by E-mail Share Building Technologies Office: Commercial Building Partnership Opportunities with the Department of Energy on Facebook Tweet about Building Technologies Office: Commercial Building Partnership Opportunities with the Department of Energy on Twitter Bookmark Building Technologies Office: Commercial Building Partnership Opportunities with the Department of Energy on Google Bookmark Building Technologies Office: Commercial Building Partnership Opportunities with the Department of Energy on Delicious Rank Building Technologies Office: Commercial Building Partnership Opportunities with the Department of Energy on Digg Find More places to share Building Technologies Office: Commercial

396

Building Technologies Office: About Residential Building Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

About Residential About Residential Building Programs to someone by E-mail Share Building Technologies Office: About Residential Building Programs on Facebook Tweet about Building Technologies Office: About Residential Building Programs on Twitter Bookmark Building Technologies Office: About Residential Building Programs on Google Bookmark Building Technologies Office: About Residential Building Programs on Delicious Rank Building Technologies Office: About Residential Building Programs on Digg Find More places to share Building Technologies Office: About Residential Building Programs on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Technology Research, Standards, & Codes Popular Residential Links Success Stories Previous Next Warming Up to Pump Heat.

397

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

398

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

399

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

400

Assessment of Distributed Energy Adoption in Commercial Buildings: Part 1: An Analysis of Policy, Building Loads, Tariff Design, and Technology Development  

E-Print Network (OSTI)

DER technologies, Japanese energy tariffs, and prototypicalon DER project costs, energy tariff reductions, or utilitypower, building energy efficiency, tariff, building loads,

Zhou, Nan; Nishida, Masaru; Gao, Weijun; Marnay, Chris

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Replacement element for automobile thermostat  

Science Conference Proceedings (OSTI)

This patent describes a thermostat replacement element for use in a cooling system in which a continuous stream of coolant normally flows from a radiator through a thermostat to an engine. The thermostat is mounted within a mounting cavity and permits maximum flow of coolant through the cooling system when in an open position. The replacement element comprises a disc-shaped member having a diameter substantially corresponding to the diameter of the mounting cavity. The member is provided with apertures of a predetermined size to permit flow of coolant therethrough at a rate generally corresponding to the rate of flow of coolant through the thermostat when the thermostat is in an open position.

Ferrari, W.

1988-06-07T23:59:59.000Z

402

Advanced Energy Retrofit Guide Office Buildings  

SciTech Connect

The Advanced Energy Retrofit Guide for Office Buildings is a component of the Department of Energys Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

Liu, Guopeng; Liu, Bing; Wang, Weimin; Zhang, Jian; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

2011-09-27T23:59:59.000Z

403

Advanced Energy Retrofit Guide Retail Buildings  

Science Conference Proceedings (OSTI)

The Advanced Energy Retrofit Guide for Retail Buildings is a component of the Department of Energys Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

Liu, Guopeng; Liu, Bing; Zhang, Jian; Wang, Weimin; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

2011-09-19T23:59:59.000Z

404

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

heating Special fund for demonstration projects of renewable energy in buildings Subsidy for demonstration projects of solar

Zhou, Nan

2010-01-01T23:59:59.000Z

405

Preoperational test report, vent building ventilation system  

Science Conference Proceedings (OSTI)

This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

Clifton, F.T.

1997-11-04T23:59:59.000Z

406

Solar Thermal Demonstration Project  

SciTech Connect

HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with ??Kalwall?? building panels. An added feature of the ??Kalwall? system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

Biesinger, K.; Cuppett, D.; Dyer, D.

2012-01-30T23:59:59.000Z

407

Building Technologies Office: Bookmark Notice  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS APPLIANCE & EQUIPMENT STANDARDS BUILDING ENERGY CODES EERE Building Technologies Office Commercial Buildings Printable Version...

408

Better Buildings Alliance Equipment Performance Specifications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BBA Equipment Performance BBA Equipment Performance Specifications William Goetzler Navigant Consulting william.goetzler@navigant.com (781) 270 8351 April 4, 2013 Better Buildings Alliance BTO Program Review 2 | Building Technologies Office eere.energy.gov Project Overview The BBA Performance Specifications project provides information and tools to help BBA members and other commercial building owners/operators specify and purchase high efficiency equipment. - Ensures targeted technologies are of interest to end users and manufacturers

409

Better Buildings Alliance Equipment Performance Specifications  

NLE Websites -- All DOE Office Websites (Extended Search)

BBA Equipment Performance BBA Equipment Performance Specifications William Goetzler Navigant Consulting william.goetzler@navigant.com (781) 270 8351 April 4, 2013 Better Buildings Alliance BTO Program Review 2 | Building Technologies Office eere.energy.gov Project Overview The BBA Performance Specifications project provides information and tools to help BBA members and other commercial building owners/operators specify and purchase high efficiency equipment. - Ensures targeted technologies are of interest to end users and manufacturers

410

Building Technologies Office: Air-Source Integrated Heat Pump Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Air-Source Integrated Air-Source Integrated Heat Pump Research Project to someone by E-mail Share Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Facebook Tweet about Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Twitter Bookmark Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Google Bookmark Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Delicious Rank Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Digg Find More places to share Building Technologies Office: Air-Source Integrated Heat Pump Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research

411

Building Technologies Office: Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Contacts on Twitter Bookmark Building Technologies Office: Contacts on Google Bookmark Building Technologies Office: Contacts on Delicious Rank Building...

412

Building Technologies Office: Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: Webmaster on Twitter Bookmark Building Technologies Office: Webmaster on Google Bookmark Building Technologies Office: Webmaster on Delicious Rank Building...

413

Building and Fire Publications  

Science Conference Proceedings (OSTI)

... high rise buildings; building collapse; disasters; fire ... adhesive strength; building codes; cohesive ... materials; thermal conductivity; thermal insulation ...

414

Building Technologies Office: Residential Buildings Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Efficiency Meeting to someone by E-mail Share Building Technologies Office: Residential Buildings Energy Efficiency Meeting on Facebook Tweet about Building Technologies...

415

Building Technologies Office: Residential Buildings Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

Buildings Energy Efficiency Meeting The U.S. Department of Energy (DOE) Building America program held the Residential Buildings Energy Efficiency Meeting in Denver, Colorado, on...

416

Building Technologies Office: 2013 DOE Building Technologies...  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 DOE Building Technologies Office Program Review to someone by E-mail Share Building Technologies Office: 2013 DOE Building Technologies Office Program Review on Facebook Tweet...

417

Building America Building Science Education Roadmap  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building America Building America Building Science Education Roadmap April 2013 Contents Introduction ................................................................................................................................ 3 Background ................................................................................................................................. 4 Summit Participants .................................................................................................................... 5 Key Results .................................................................................................................................. 6 Problem ...................................................................................................................................... 7

418

Improve energy use in commercial buildings | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Improve energy use in commercial buildings Improve energy use in commercial buildings Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section How can we help you? Build an energy program Improve building and plant performance Improve energy use in commercial buildings Find guidance for energy-efficient design projects Manage energy use in manufacturing Develop programs and policies

419

Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project  

Science Conference Proceedings (OSTI)

Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-24T23:59:59.000Z

420

Testing the effectiveness of mobile home weatherization measures in a controlled environment: The SERI CMFERT (Collaborative Manufactured Buildings Facility for Energy Research and Training) Project  

SciTech Connect

For several years the Solar Energy Research Institute has been testing the effectiveness of mobile home weatherization measures, with the support of the US DOE Office of State and Local Assistance Programs Weatherization Assistance Program, the DOE Office of Buildings and Community Systems, the seven states within the federal Weatherization Region 7, the Colorado Division of Housing, and the DOE Denver Support Office. During the winter of 1988--89, several weatherization measures were thermally tested on three mobile homes under controlled conditions inside a large environmental enclosure. The effects of each weatherization measure on conduction losses, infiltration losses, and combined furnace and duct-delivered heat efficiency were monitored. The retrofit options included air sealing, duct repair, furnace tune-up, interior storm panels, floor insulation, and roof insulation. The study demonstrated that cost-effective heating energy savings of about 20% to 50% are possible if weatherization techniques adapted to the special construction details in mobile homes are applied. 24 refs., 18 figs., 9 tabs.

Judkoff, R.D.; Hancock, C.E.; Franconi, E.

1990-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Industrial Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Industrial Industrial Industrial / Manufacturing Buildings Industrial/manufacturing buildings are not considered commercial, but are covered by the Manufacturing Energy Consumption Survey (MECS). See the MECS home page for further information. Commercial buildings found on a manufacturing industrial complex, such as an office building for a manufacturer, are not considered to be commercial if they have the same owner and operator as the industrial complex. However, they would be counted in the CBECS if they were owned and operated independently of the manufacturing industrial complex. Specific questions may be directed to: Joelle Michaels joelle.michaels@eia.doe.gov CBECS Manager Release date: January 21, 2003 Page last modified: May 5, 2009 10:18 AM http://www.eia.gov/consumption/commercial/data/archive/cbecs/pba99/industrial.html

422

Building debris  

E-Print Network (OSTI)

This thesis relates architectural practices to intelligent use of resources and the reuse of derelict spaces. The initial investigation of rammed earth as a building material is followed by site-specific operations at the ...

Dahmen, Joseph (Joseph F. D.)

2006-01-01T23:59:59.000Z

423

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

424

Information Resources: LED Replacements for Linear Fluorescent Lamps  

NLE Websites -- All DOE Office Websites (Extended Search)

Replacements for Linear Fluorescent Lamps Webcast Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and fluorescent lamps were installed in a variety of recessed troffer luminaires for comparison in an office environment. The presentation concluded with a discussion of specifications listed in a newly updated technology fact sheet. View presentation slides View the text-alternative version View the webcast (WMV 16 MB) Download Windows Media Player

425

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

426

Resources on Sustainable Buildings and Campuses | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resources on Resources on Sustainable Buildings and Campuses Resources on Sustainable Buildings and Campuses October 4, 2013 - 5:04pm Addthis Building Technology Office Resources The Building Technology Office offers useful resources to plan and implement energy-efficiency projects. Building Energy Software Tools Directory Buildings Performance Database Energy Modeling Software Better Buildings Alliance Webinars Hospital Energy Alliance Videos Solid-State Lighting Technology Fact Sheets Many helpful resources about sustainable buildings and campuses are available. Also see Case Studies and Contacts. Federal Requirements and Programs Buildings Technologies Program: A U.S. Department of Energy (DOE) program that leads a vast network of research and industry partners to continually

427

Building Technologies Office: 2013 DOE Building Technologies Office Program  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 DOE Building Technologies Office Program Review 2013 DOE Building Technologies Office Program Review The 2013 Department of Energy (DOE) Building Technologies Office Program Review was held April 2-4, 2013 in Washington, DC. This inaugural review encompassed active work done by the Building Technologies Office (BTO), with a total of 59 individual activities reviewed. Sixty independent experts assessed the progress and contributions of each project toward BTO's mission and goals, and these assessments will be used to enhance the management of existing efforts, gauge the effectiveness of projects, and design future programs. The meeting also provided an opportunity to promote collaborations, partnerships, and technology transfers. 2013 Program Peer Review Report | 2013 Program Peer Review Presentations

428

Hayward's Green Building Ordinance  

E-Print Network (OSTI)

Please accept on behalf of the City of Hayward this request for California Energy Commission (CEe) review and approval of Hayward's Green Building Ordinance.and related energy cost effectiveness study, which will mandate exceeding the 2008 Energy Code standards. As we have discussed previously, Hayward adopted a Green Building Ordinance last fall (see attached Tab 1). The Ordinance requires that new construction and non-residential development exceeding 1,000 square feet comply with the City's green building ordinance standards (described below), if a permit application is submitted for such developments after August 1 of this year, or after the CEC and Building Standards Commission (BSe) approve such standards. Hayward's ordinance indicates that new residential development shall be GreenPaint Rated, meaning achieving energy efficiency at least 15 % above State standards. Build It Green staff, who oversee the GreenPaint Rated program, have indicated that their new standards/guidelines will require projects Rated to exceed 2008 State energy efficiency standards by at least 15 % in order to be GreenPoint Rated. Their current standards require exceeding 2005 State energy efficiency standards by at least 15%. For non-residential development, certain standards related to energy efficiency need to be met in one of three ways: the lighting load for fixtures shall be reduced by at least 15 % below 2008 Title 24

Joe Loyer

2009-01-01T23:59:59.000Z

429

ENERGY STAR Building Manual  

E-Print Network (OSTI)

Businesses are reducing their energy use by 30 percent or more through effective energy management practices that involve assessing energy performance, setting energy savings goals, and regularly evaluating progress. Building-level energy performance benchmarking is an integral part of this effort. It provides the reference points necessary for developing sound energy management practices and strategies and for gauging their effectiveness. Energy use benchmarking is a process that either compares the energy use of a building or group of buildings with other similar structures or looks at how energy use varies from a baseline. It is a critical step in any building upgrade project, because it informs organizations about how and where they use energy and what factors drive their energy use. Benchmarking enables energy managers to determine the key metrics for assessing performance, to establish baselines, and to set goals for energy performance. It also helps them identify building upgrade opportunities that can increase profitability by lowering energy and operating costs, and it facilitates continuous improvement by providing diagnostic measures to evaluate performance over time. Benchmarking energy performance helps energy managers to identify best practices that can

unknown authors

2008-01-01T23:59:59.000Z

430

Plant Support Engineering: Guidance for the Replacement of Large Electric Motors at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The purpose of this report is to prepare a primary source of guidance for a project manager who is coordinating a team of plant personnel tasked with replacing a large electric motor. The report provides a generic process that describes interfaces and key steps necessary to ensure that the motor is evaluated and replaced in the most cost-effective and efficient means possible. The report also provides guidance regarding the typical composition of the project team and demonstrates how performance of their...

2010-03-15T23:59:59.000Z

431

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

432

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet)  

Science Conference Proceedings (OSTI)

Fact sheet offering practical information about building energy efficient buildings and using renewable energy. Includes a checklist and resources. Highlights successful projects in Greensburg, Kansas.

Not Available

2009-10-01T23:59:59.000Z

433

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Baseline Development and Control Technical Baseline Development and Control Examples Example 40 5.0 PROJECT MANAGEMENT AND CONTROL The Project Management and Control section provides an overview of the project management and control systems that will be used to manage the 324/327 Buildings Stabilization/Deactivation Project, addressing the following key elements of project management and control:  Project Management Control System (PMCS) - Work breakdown structure - Baseline development/update - Scheduling - Performance measurement and reporting - Change control  Information and reporting - Project status report - Project manager's monthly report - FDH/RL project status review - DOE-HQ project management reviews - Special reviews

434

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

435

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

436

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

437

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

438

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

439

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

440

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

442

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

444

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

445

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

446

Building "Huys Hengelo" in VRML  

E-Print Network (OSTI)

In this paper we report about our attempts to rebuild a historical building, `Huys Hengelo', its interior, a farm built next to it and other parts of its environment (including a draw-bridge and a gate) using the Virtual Reality Modeling Language (VRML). This castle building played an important role in the history of its region. The main issues we deal with in this paper are: the unreliability of available sources - forcing us to show alternatives rather than `the building as it was', the possibility to allow users to make changes and to experiment with different geographies, animations showing how parts of the wooden buildings were constructed during that time, the interface with the user and, as the project started as a student project on the request of some local historians and architects, some of our experiences with the co-operation between them and computer science students and researchers.

Reidsma Kragtwijk And; D. Reidsma; M. Kragtwijk; A. Nijholt

2001-01-01T23:59:59.000Z

447

Property:Number of Build Out Units Deployed | Open Energy Information  

Open Energy Info (EERE)

Build Out Units Deployed Build Out Units Deployed Jump to: navigation, search Property Name Number of Build Out Units Deployed Property Type String Pages using the property "Number of Build Out Units Deployed" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 50 + MHK Projects/AWS II + 20 + MHK Projects/Algiers Light Project + 500 + MHK Projects/Anconia Point Project + 500 + MHK Projects/Ashley Point Project + 3700 + MHK Projects/Avondale Bend Project + 450 + MHK Projects/Bar Field Bend + 2350 + MHK Projects/Barfield Point + 2851 + MHK Projects/Bayou Latenache + 1260 + MHK Projects/BioSTREAM Pilot Plant + 1 + MHK Projects/Bondurant Chute + 3802 + MHK Projects/Breeze Point + 4942 + MHK Projects/Brilliant Point Project + 1400 +

448

B Plant process piping replacement feasibility study  

SciTech Connect

Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

Howden, G.F.

1996-02-07T23:59:59.000Z

449

Commercial Building Performance Monitoring and Evaluation | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Projects » Commercial Building Research Projects » Commercial Building Performance Monitoring and Evaluation Commercial Building Performance Monitoring and Evaluation The Building Technologies Office (BTO) uses performance metrics to standardize the measurement and characterization of energy performance in commercial buildings. These metrics help inform the effectiveness of energy efficiency measures in existing buildings and highlight opportunities to improve performance. Various tiers of metrics are available for different users. Performance Metrics Objectives Performance metrics deal with building energy consumption and on-site energy production. To be useful, industry must agree on standard definitions for these metrics and share consistent procedures for collecting and reporting data as well as ensuring data quality.

450

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

451

Decontamination of hot cells K-1, K-3, M-1, M-3, and A-1, M-Wing, Building 200: Project final report Argonne National Laboratory-East  

SciTech Connect

The purpose of this project was to remove radioactively contaminated materials and equipment from the hot cells, to decontaminate the hot cells, and to dispose of the radioactive waste. The goal was to reduce stack releases of Rn-220 and to place the hot cells in an emptied, decontaminated condition with less than 10 {micro}Sv/h (1 mrem/h) general radiation background. The following actions were needed: organize and mobilize a decontamination team; prepare decontamination plans and procedures; perform safety analyses to ensure protection of the workers, public, and environment; remotely size-reduce, package, and remove radioactive materials and equipment for waste disposal; remotely decontaminate surfaces to reduce hot cell radiation background levels to allow personnel entries using supplied air and full protective suits; disassemble and package the remaining radioactive materials and equipment using hands-on techniques; decontaminate hot cell surfaces to remove loose radioactive contaminants and to attain a less than 10 {micro}Sv/h (1 mrem/h) general background level; document and dispose of the radioactive and mixed waste; and conduct a final radiological survey.

Cheever, C.L.; Rose, R.W.

1996-09-01T23:59:59.000Z

452

Moisture Durability of Vapor Permeable Insulating Sheathing (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy.gov (U.S. Department of Energy (DOE))

In this project, Building America team Building Science Corporation researched some of the ramifications of using exterior, vapor permeable insulation on retrofit walls with vapor permeable cavity insulation. Retrofit strategies are a key factor in reducing exterior building stock consumption.

453

Building and Fire Publications  

Science Conference Proceedings (OSTI)

... Measured Performance of Building Integrated Photovoltaic Panels. Round 2. Measured Performance of Building Integrated Photovoltaic Panels. ...

454

Nebraska | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Nebraska Nebraska Last updated on 2013-11-04 Current News Nebraska Legislature adopted the 2009 IECC/ASHRAE 90.1-2007. The code became effective August 27, 2011. Commercial Residential Code Change Current Code 2009 IECC Amendments / Additional State Code Information Cities and counties may adopt codes that differ from the Nebraska Energy Code; however, state law requires the adopted code to be equivalent to the Nebraska Energy Code. For existing buildings, only those renovations that will cost more than 50 percent of the replacement cost of the building must comply with the code. Approved Compliance Tools Can use COMcheck State Specific Research Impacts of ASHRAE 90.1-2007 for Commercial Buildings in the State of Nebraska (BECP Report, Sept. 2009) Approximate Energy Efficiency Equivalent to 2009 IECC

455

Integrated Building Management System (IBMS)  

SciTech Connect

This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

Anita Lewis

2012-07-01T23:59:59.000Z

456

Simulation Analyses in Support of DOEs Fossil Fuel Rule for Single Component Equipment and Lighting Replacements  

SciTech Connect

At the request of DOEs Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building.

Halverson, Mark A.; Wang, Weimin

2013-10-16T23:59:59.000Z

457

Building Technologies Office: HVAC and Water Heater Field Tests Research  

NLE Websites -- All DOE Office Websites (Extended Search)

HVAC and Water Heater HVAC and Water Heater Field Tests Research Project to someone by E-mail Share Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Facebook Tweet about Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Twitter Bookmark Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Google Bookmark Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Delicious Rank Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Digg Find More places to share Building Technologies Office: HVAC and Water Heater Field Tests Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research

458

Building Technologies Office: Low-Global Warming Potential Refrigerants  

NLE Websites -- All DOE Office Websites (Extended Search)

Low-Global Warming Low-Global Warming Potential Refrigerants Research Project to someone by E-mail Share Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Facebook Tweet about Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Twitter Bookmark Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Google Bookmark Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Delicious Rank Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Digg Find More places to share Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on AddThis.com... About Take Action to Save Energy

459

Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger  

NLE Websites -- All DOE Office Websites (Extended Search)

Radial Air Bearing Radial Air Bearing Heat Exchanger Research Project to someone by E-mail Share Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Facebook Tweet about Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Twitter Bookmark Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Google Bookmark Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Delicious Rank Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Digg Find More places to share Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

460

Building Technologies Office: Open-Standard Wireless Controllers for Water  

NLE Websites -- All DOE Office Websites (Extended Search)

Open-Standard Wireless Open-Standard Wireless Controllers for Water Heaters Research Project to someone by E-mail Share Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Facebook Tweet about Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Twitter Bookmark Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Google Bookmark Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Delicious Rank Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Digg Find More places to share Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on

Note: This page contains sample records for the topic "building replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perfo