National Library of Energy BETA

Sample records for building design construction

  1. Green Buildings: Construction Design Firms' Implementation of Sustainable Design Standards

    E-Print Network [OSTI]

    Malone, Nathan

    2008-12-19

    in order to stay competitive in the construction design industry. The paper starts by describing the parts of the current industry standard green building rating system, Leadership in Energy and Environmental Design (LEED), and explaining whom uses LEED...

  2. University of Leeds Sustainable buildings design, construction and refurbishment

    E-Print Network [OSTI]

    Haase, Markus

    University of Leeds Sustainable buildings design, construction and refurbishment standard February 2014 The construction of new University buildings and the refurbishment of our existing estate or refurbishment. The way we construct our buildings not only influences our success in meeting carbon reduction

  3. Y-12 Sustainable Design Principles for Building Design and Construction

    SciTech Connect (OSTI)

    Jackson, J. G.

    2008-11-01

    B&W Y-12 is committed to modernizing the Y-12 complex to meet future needs with a sustainable and responsive infrastructure and to integrating sustainability principles and practices into Y-12 work (Y72-001, B&W Y-12 Environmental, Safety and Health Policy). This commitment to sustainability and specifically sustainable design of buildings is also incorporated into Presidential Executive Orders (EO), DOE Orders (DOE O), and goals. Sustainable building design is an approach to design, construct, and operate facilities in an efficient and environmentally sound manner that will produce a healthful, resource-efficient and productive working environment that is inherently protective of the environment. The DOE has established the following 5 Guiding Principles for High Performance Sustainable Building (HPSB), and has issued directives that require Y-12 to incorporate the principles and a number of supporting specific practices and techniques into building design, construction and renovation projects: (1) Employ Integrated Design Principles; (2) Optimize Energy Performance; (3) Protect and Conserve Water; (4) Enhance Indoor Environmental Quality; and (5) Reduce Environmental Impact of Materials. The purpose of this document is to present the required sustainable building principles, practices and techniques, summarize the key drivers for incorporating them into Y-12 projects, and present additional recommendations and resources that can be used to support sustainable buildings to enhance the environmental and economic performance of the Y-12 Complex.

  4. Final Draft Building Automation Systems Design and Construction Standards October 3rd

    E-Print Network [OSTI]

    Portman, Douglas

    Final Draft Building Automation Systems Design and Construction Standards October 3rd , 2013 1 Automation Systems Design and Construction Standards October 3rd , 2013 2 University of Rochester Building Automation Systems Design and Construction Standards October 3rd , 2013 3 Section 1 General Requirements

  5. Constructing Nature's Building Blocks: An Analysis of Computational Protein Design Today

    E-Print Network [OSTI]

    1 Constructing Nature's Building Blocks: An Analysis of Computational Protein Design Today by Guha . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Analysis of search algorithms to serve as enzymes. Computational protein design attempts to, given a three dimensional protein structure

  6. High-Performance Sustainable Building Design for New Construction and Major Renovations

    Broader source: Energy.gov [DOE]

    New construction and major renovations to existing buildings offer federal agencies opportunities to create sustainable high-performance buildings. High-performance buildings can incorporate energy-efficient designs, sustainable siting and materials, and renewable energy technologies along with other innovative strategies.

  7. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    SciTech Connect (OSTI)

    Scheib, J.; Pless, S.; Torcellini, P.

    2014-08-01

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

  8. BUILDING PERFORMANCE ENGINEERING DURING CONSTRUCTION

    E-Print Network [OSTI]

    Toole, T. Michael

    1 BUILDING PERFORMANCE ENGINEERING DURING CONSTRUCTION T. Michael Toole1 and Matthew Hallowell2 of building performance engineering tasks on design-bid-build projects are typically provided by entities building construction projects. Twenty four building performance engineering tasks were required

  9. FireWise Construction: Site Design & Building Materials

    E-Print Network [OSTI]

    by the ICC and the three statutory members of the International Code Council: Building Officials and Code-Urban Interface Code #12;About the Authors David Bueche, Ph.D., of Lakewood, Colo., works for Hoover Treated Wood code development, serves on the National Fire Protection Association (NFPA) and American Society

  10. Opportunities for building design and construction resulting from local resources

    E-Print Network [OSTI]

    Weathers, Thomas A. (Thomas Anthony)

    2007-01-01

    Current and future generations of architects must learn to operate effectively in an era of unprecedented resource constraints if they want to achieve their design intentions. This thesis addresses the architect's role in ...

  11. Introduction to Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Momentum behind zero energy building design and construction is increasing, presenting a tremendous opportunity for advancing energy performance in the commercial building industry. At the same time, there is a lingering perception that zero energy buildings must be cost prohibitive or limited to showcase projects. Fortunately, an increasing number of projects are demonstrating that high performance can be achieved within typical budgets. This factsheet highlights replicable, recommended strategies for achieving high performance on a budget, based on experiences from past projects.

  12. Proposal for the Award of a Contract for the Construction of the Building designed to house the Accumulator Ring for the LEP Pre-injector

    E-Print Network [OSTI]

    1983-01-01

    Proposal for the Award of a Contract for the Construction of the Building designed to house the Accumulator Ring for the LEP Pre-injector

  13. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  14. The construction industry is comprised of a wide range of businesses involved in engineering standards, building design, and the construction of various types of materials and

    E-Print Network [OSTI]

    energy efficient and cost-effective. Facilities can be designed, built, operated, and regulated-related impacts, such as high winds and flooding, influence the choice of site construction, building techniques data, such as temperature frequency distributions. · ClimateNormals, which are the averag

  15. Low energy architecture in the tropics: from design to building construction

    E-Print Network [OSTI]

    Harry Boyer; Frédéric Miranville; François Payet

    2012-12-23

    This paper presents a realization of passive construction in Reunion, French Department in the Indian Ocean (southern hemisphere) submitted to a wet tropical climate. Aspects of passive construction were integrated at the design stage and this house does not present additional costs towards classical ones. This project was awarded a prize for architecture climate.

  16. Low energy architecture in the tropics: from design to building construction

    E-Print Network [OSTI]

    Boyer, Harry; Payet, François

    2012-01-01

    This paper presents a realization of passive construction in Reunion, French Department in the Indian Ocean (southern hemisphere) submitted to a wet tropical climate. Aspects of passive construction were integrated at the design stage and this house does not present additional costs towards classical ones. This project was awarded a prize for architecture climate.

  17. Handbook of energy use for building construction

    SciTech Connect (OSTI)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  18. Building wall construction

    SciTech Connect (OSTI)

    Mulford, C.E.

    1987-04-21

    A building wall construction is described comprising, in combination: (a) an elongated top plate; (b) an elongated bottom plate extending in spaced, horizontal, parallel relation to the top plate; (c) elongated studs arranged in spaced, vertical, parallel relation and affixed at their upper and lower ends to the top and bottom plates, respectively; (d) each of the studs, top plates and bottom plates comprises a pair of spaced wooden members of equal length having a substantially rectangular groove centrally disposed in one face thereof extending for the entire length of the wooden members, and at least one web member of fire-rated gypsum board having opposite, marginal edge portions secured in the grooves; (e) sheathing layers affixed to both sides of the stud members and extending vertically between the bottom and top plates, and horizontally between the studs to enclose the space therebetween; and (f) at least one panel member of fire-rated gypsum board extending horizontally between each successive pair of studs parallel to and spaced from each of the sheathing layers, thus providing at least two, separated spaces between the sheathing layers.

  19. MIT and the Building/Construction Industries MIT Industry Brief

    E-Print Network [OSTI]

    Herr, Hugh

    /construction and related industries such as: · Building, infrastructure · Materials, energy · Architecture, design · Smart technologies, sensor systems · Housing, urban development/planning, real estate Following are brief structures, materials, industrialized building systems, energy and lighting in buildings, air quality control

  20. New Construction Commercial Reference Buildings — Archive

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  1. Sustainability in Federal Building New Construction and Major Renovations

    Broader source: Energy.gov [DOE]

    The Guiding Principles require agencies to design, construct, and operate high-performance and sustainable buildings. New construction and major renovations to existing buildings offer agencies opportunities to incorporate energy-efficient designs, sustainable siting and materials, and renewable energy technologies into federal facilities.

  2. Meta-Analysis of Design-Bid-Build (DBB), Competitive Sealed Proposal (CSP), Design-Build (DB), and Construction Manager at Risk (CMR) Regarding Selected Performance Metrics 

    E-Print Network [OSTI]

    Jimoh, Moruf Ajide

    2014-12-11

    The need for a one size fits all type of project delivery system still persists within the architecture, engineering, and construction (AEC) industry. However, owners still feel the need for a more refined system that could ...

  3. Advanced Building Systems & Architectural Design

    E-Print Network [OSTI]

    Subramanian, Venkat

    primary research interests are whole building performance analysis, passive Advanced Building Systems & Architectural Design University with a Ph.D. in Building Performance and Diagnostics. Currently he

  4. DESIGN [fabrication] BUILD

    E-Print Network [OSTI]

    Rader, Nicolas Glen

    2006-01-01

    DESIGN [fabrication] BUILD proposes a new relationship among the architect, homeowner, and fabricator/assembler through the use of parametric software in order to create a truly customizable prefabricated home. This ...

  5. Relationships in design build

    E-Print Network [OSTI]

    Wampler, Charles Wilson

    2010-01-01

    As design build (DB) becomes more popular, different ways of writing contracts and forming relationships with the various parties are being considered. The main point of this paper is to look at the relationships between ...

  6. 1999 Commercial Building Characteristics--Year Constructed Comparison

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed Comparison Percentage of Floorspace and Buildings by Year Constructed, 1999 Percentage of Floorspace and Buildings by Year Constructed, 1999. If having trouble...

  7. Design and Construction of a Guarded Hot Box Facility for Evaluating the Thermal Performance of Building Wall Materials 

    E-Print Network [OSTI]

    Mero, Claire Renee

    2012-07-16

    was used as guide for the construction and testing of sample specimen. This standard called for an air velocity profile uniform within 10 percent of the average. Velocity tests were performed with various different configurations to give a uniform velocity...

  8. NOAA Helps the Construction Sector Build for a Changing Climate The construction industry is comprised of a wide range of business involved in engineering standards,

    E-Print Network [OSTI]

    construction, building techniques, and materials construction workers use. The potential risk of inclement planning purposes, risk management, and assessing environmental footprints. A changing climate can lead by the construction sector: Precipitation data to design and build natural gas pipeline trenc

  9. Dynamic building enclosures : the design of an innovative constructive system which permits mechanically-driven, computer-controlled shape transformations to the building envelope

    E-Print Network [OSTI]

    Nelson, Eric (Eric Freeman), 1964-

    1998-01-01

    Dynamic Building Enclosures is a system of prefabricated, lightweight, kit-of-parts wall and/or roof elements. This system has the unique capability of dynamically altering, or mutating its shape in reaction to changing ...

  10. Locomotive design and construction /

    E-Print Network [OSTI]

    Maris, James Clyde.

    1919-01-01

    . Proportions of Locomotive 20 Comparison of various factors. Boilers 23 Types, boiler performance, details, fire box design and performance, grate design, ash pan design, petti­ coat pipe and front end arrangement, stack design, exhaust nozzle sizes..., fittings and appliances, brick arches. Boiler Making 46 Laying out templates, forming the plates, flange block design, swageblock design, fitting up, testing, firing up. Superheated Steam for Locomotives 58 Modern practice, types of superheaters...

  11. Integrating Safety into Design and Construction | Department...

    Office of Environmental Management (EM)

    Integrating Safety into Design and Construction Integrating Safety into Design and Construction DepSecMemoIntegratingSafetyInDesignAndConstruction05Dec2005.pdf More Documents &...

  12. Building America Webinar: New Construction Hybrid-Ductless Heat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study:...

  13. Existing Commercial Reference Buildings Constructed In or After 1980 — Archive

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the commercial reference building models for existing buildings constructed in or after 1980, organized by building type and location.

  14. Evaluating Utility Executives' Perceptions of Smart Grid Costs, Benefits and Adoption Plans To Assess Impacts on Building Design and Construction 

    E-Print Network [OSTI]

    Rao, Ameya Vinayak

    2011-10-21

    part of electric infrastructure providing 24 percent of total US electric sales and 31 percent of residential electric sales (US Energy Information Administration, 2008). The smart grid transformation will have important impacts on design... for Question 4 (Cooperatives and Municipals) ................................... 32 Figure 17 Charts for Question 4 Residential Customer Size Strata ................................. 33 Figure 18 Charts for Question 4 CDD...

  15. Use of advanced composite materials for innovative building design solutions/

    E-Print Network [OSTI]

    Lau, Tak-bun, Denvid

    2009-01-01

    Advanced composite materials become popular in construction industry for the innovative building design solutions including strengthening and retrofitting of existing structures. The interface between different materials ...

  16. MAINTENANCE (Purchasing Department) CONSTRUCTION (Design & Construction Services Department)

    E-Print Network [OSTI]

    MAINTENANCE (Purchasing Department) vs. CONSTRUCTION (Design & Construction Services Department NO NO Maintenance or Construction Decision Tree Maintenance : Maintenance is the upkeep of property , machinery

  17. Building America Webinar: High Performance Enclosure Strategies: Part II, New Construction

    Broader source: Energy.gov [DOE]

    The webinar is the second in the series on designing and constructing high performance building enclosures, and will focus on effective strategies to address moisture and thermal needs.

  18. Existing Commercial Reference Buildings Constructed Before 1980 — Archive

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the commercial reference building models for existing buildings constructed before 1980, organized by building type and location. A summary of building types and...

  19. NATURE'S BUILDING CODE : THE BAUHAUS SCHOOL OF CELL DESIGN

    E-Print Network [OSTI]

    Boal, David

    NATURE'S BUILDING CODE : THE BAUHAUS SCHOOL OF CELL DESIGN by David H. Boal LA PHYSIQUE ET L'ÉDUCATION ( NATURE'S BUILDING CODE ... ) Prof. D.H. Boal , Dept. of Physics, Simon Fra- ser University's building code. By considering the construction of man-made buildings and bridges, we can extract some

  20. Building America Webinar: New Construction Hybrid-Ductless Heat...

    Energy Savers [EERE]

    Webinar: New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile...

  1. Building America Webinar: New Construction Hybrid-Ductless Heat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study: Resistance is Futile This...

  2. Automated Metadata Construction To Support Portable Building Applications

    E-Print Network [OSTI]

    Weimer, Westley

    ; Sensor Metadata; Portable Building Applications; Metadata Normalization 1. INTRODUCTION While advancesAutomated Metadata Construction To Support Portable Building Applications Arka A. Bhattacharya UC in buildings with digital control systems [23] comprised of wired sensor networks. These sensors have scant

  3. Promoting Green Jobs in the Building and Construction Sector

    E-Print Network [OSTI]

    Promoting Green Jobs in the Building and Construction Sector BUILDING FOR ECOLOGICALLY RESPONSIVE of effective green building policy for legislators; · skills upgrade for construction workers; · green building to 40% of greenhouse gas (GHG) emission, 30 to 40% of solid waste generation, 25 to 40% of total energy

  4. LEARNINGACTIVITY#5 Design and Build

    E-Print Network [OSTI]

    Bowen, James D.

    , experimental data, and practical considerations contribute to the final product. We'll see how the truss; how structural analysis results and experimental data contribute to the design of structural members, you will be able to do the following: n Explain how design-build project delivery differs from design-bid

  5. For building and construction. Technical notes

    SciTech Connect (OSTI)

    Bansal, G.D.; Sharma, D.; Prakash, C.; Rao, K.R.; Jain, S.P.

    1981-01-01

    Sixteen technical notes are compiled coveering: Apertures other than Northlights; Design of pile caps; thermal insulation of roofs of industrial buildings; room heating by solar energy; charging device for small capacity lime kilns; waste water disposal system for rural areas; low cost sound absorbing materials; solar space heating system; pedestal piles for low cost houses; solar timber seasoning kiln; design of cold storage for fruits and vegetables; techniques for improved thatch roofs; resilient floors for structural noise reduction; plastic composite panels for partition claddings and flush doors; chimney design for domestic kitchens; and a cheap and effective fire retardant treatment for paddy thatch/coconut leaves/palmyrah thatch. The notes give brief descriptions of the design and use of the materials and techniques covered.

  6. Architecture and Environmental Building Design

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    1 56% 2% 7% 2% 5% 28% Architecture and Environmental Building Design 33% response rate Full Seeking Employment as of the date they completed the survey- 27% 69% 19% 12% Landscape Architecture 46" Architecture, Master of Architecture (M.Arch) Fulltime Employment Amanda Levete Architects, Design, Part II

  7. Construction Design anD Materials

    E-Print Network [OSTI]

    Firewise Construction Design anD Materials #12;Firewise Construction Design anD Materials Peter a lecture on firewise construction that Peter presented for several years. Acknowledgements This publication Firewise Construction i #12;Firewise Construction Table of Contents 1. Introduction

  8. MIT and Building/Construction & Related Industries MIT Industry Brief

    E-Print Network [OSTI]

    Kastner, Marc A.

    MIT and Building/Construction & Related Industries MIT Industry Brief MIT's Industrial Liaison-617-253-2691, e-mail us at liaison@ilp.mit.edu, or visit http://ilp.mit.edu. MIT and Building and education on topics important to build- ing, construction, and related areas and industries such as

  9. CEE 812 Structural Engineering Seminar Series Design and Construction

    E-Print Network [OSTI]

    Kamat, Vineet R.

    involved in development of several wind farms, conventional biomass combustion and gasification, solarCEE 812 ­ Structural Engineering Seminar Series Design and Construction of Energy Industry and construction of non-building structures, an interesting branch of structural engineering that is often taught

  10. Evaluation of Ventilation Strategies in New Construction Multifamily Buildings

    SciTech Connect (OSTI)

    Maxwell, S.; Berger, D.; Zuluaga, M.

    2014-07-01

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the 'fresh' air is coming from is gaining significance as air-tightness standards for enclosures become more stringent, and the 'normal leakage paths through the building envelope' disappear. CARB researchers have found that the majority of high performance, new construction, multifamily housing in the Northeast use one of four general strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, and the assumption is that products will perform similarly in the field. Proper application involves matching expected performance at expected building pressures, but there is no guarantee that those conditions will exist consistently in the finished building. This research effort, which included several weeks of building pressure monitoring, sought to provide field validation of system performance. The performance of four substantially different strategies for providing make-up air to apartments was evaluated.

  11. THE PENNSYLVANIA STATE UNIVERSITY HANKIN CHAIR IN RESIDENTIAL BUILDING CONSTRUCTION

    E-Print Network [OSTI]

    Guiltinan, Mark

    THE PENNSYLVANIA STATE UNIVERSITY HANKIN CHAIR IN RESIDENTIAL BUILDING CONSTRUCTION The College Construction. This Chair was established in 1988 with a $1m endowment from the Hankin family. It provides or construction management background; substantial knowledge and experience in the field of residential building

  12. The MIT Design Advisor : simple and rapid energy simulation of early-stage building designs

    E-Print Network [OSTI]

    Urban, Bryan J. (Bryan James)

    2007-01-01

    Simulation tools, when applied early in the design process, can considerably reduce the energy demand of newly constructed buildings. For a simulation tool to assist with design, it must be easy to use, provide feedback ...

  13. Anaheim Public Utilities- Green Building and New Construction Rebate Program

    Broader source: Energy.gov [DOE]

    Anaheim Public Utilities (APU) offers commercial, industrial, residential, and institutional customers the Green Building Incentives Program to offset construction, installation and upgrade costs...

  14. The New Mexico Building and Construction Trades Council and Los...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sign labor agreements September 21, 2012 Unions, LANL sign labor agreements The New Mexico Building and Construction Trades Council and Los Alamos National Security LLC, have...

  15. Building America Webinar: High Performance Enclosure Strategies: Part II, New Construction

    Broader source: Energy.gov [DOE]

    Date/Time:  August 13, 2014; 3:00-4:30 PM EDTDescription: The webinar is the second in the series on designing and constructing high performance building enclosures, and will focus on effective...

  16. Automating Inspection and Documentation of Remote Building Construction

    E-Print Network [OSTI]

    Goldberg, Ken

    construction sites. Index Terms-- automation, construction, networked robots, pan-tilt-zoom camera, panoramic of the construction process over time to reduce travel costs and human risk. Recent developments in wireless1 Automating Inspection and Documentation of Remote Building Construction using a Robotic Camera

  17. CONSTRUCTION ALERT Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff, KOKUA

    E-Print Network [OSTI]

    CONSTRUCTION ALERT TO: Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff OF PROJECT: Early morning on November 18, 2011 HOURS OF CONSTRUCTION: The Contractor is allowed to work from persons in the vicinity of this construction project are advised to respect all construction barricades

  18. CONSTRUCTION NOTICE Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff, KOKUA

    E-Print Network [OSTI]

    CONSTRUCTION NOTICE New Notice TO: Deans, Directors, Chairpersons, Building Coordinators, Faculty, 2011 to August 15, 2011 HOURS OF CONSTRUCTION: Monday to Friday 7:30 a.m. to 4:00 p.m. ACCESSIBLE of this construction project are advised to respect all construction barricades and all posted safety/detour signs

  19. Fire and the Design of Buildings 

    E-Print Network [OSTI]

    McGuire, J

    Fire is one of the major hazards to life and property in buildings. Regulations in respect of fire safety therefore constitute a major part of every building bylaw. These regulations naturally influence the design of almost every building. Good...

  20. @ Ontario 2006 Building Code Structural Design

    E-Print Network [OSTI]

    Sheikh, Shamim A.

    @ Ontario 2006 Building Code Part 4 Structural Design Structural Losds and P r o ~ d u l r;2006 Building Code @Ontario Division B -Part 4 #12;@Ontario 2006 Building Code Part 4 Structural Design Section #12;2006 Building Code @Ontario 4.q.2. Spsclfled Loads and Effects 4 . . 2 Loads and Effects (See

  1. Automatic Construction of Building Footprints from Airborne LIDAR Data

    E-Print Network [OSTI]

    Chen, Shu-Ching

    1 Automatic Construction of Building Footprints from Airborne LIDAR Data Keqi Zhang, Jianhua Yan. INTRODUCTION BUILDING footprints are one of the fundamental GIS data components that can be used to estimate, and estimation of building base elevation for flood insurance [2]. In addition, footprint data in combination

  2. Parametric constructs : computational designs for digital fabrication

    E-Print Network [OSTI]

    Araya Goldberg, Sergio

    2006-01-01

    This thesis explores strategies for building design toolchains in order to design, develop and fabricate architectural forms. The hipothesys of this research is that by embedding ruled based procedures addressing generative, ...

  3. Building America Partnership for Improved Residential Construction...

    Energy Savers [EERE]

    America Best Practices Series Volume 15: 40% Whole-House Energy Savings in the Hot-Humid Climate Building America Technology Solutions for New and Existing Homes: Improving...

  4. READ THIS: Before You Design, Build or Renovate

    SciTech Connect (OSTI)

    Joseph Lstiburek

    2006-12-07

    This pamphlet is designed for members of the residential construction and remodeling industries, as well as owners and managers who work in affordable housing, and presents building guidance for both new construction and rehabilitation, as well as practices that can be used by property maintenance personnel.

  5. CONSTRUCTION NOTICE Deans, Directors, Chairpersons, Building Coordinators, Faculty & Staff, KOKUA

    E-Print Network [OSTI]

    CONSTRUCTION NOTICE New Notice TO: Deans, Directors, Chairpersons, Building Coordinators, Faculty, 2011 HOURS OF CONSTRUCTION: Monday to Friday 7:30 a.m. to 4:00 p.m. ACCESSIBLE ROUTES: Parking of area. ADVISORY: All persons in the vicinity of this construction project are advised to respect all

  6. Sustainability in Federal Building New Construction and Major...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    rather a strategy to make the most of limited, appropriated, funds. The performance-based design-build process incorporates the following elements: The owner is extensively...

  7. Construction design as a process for flow : applying lean principles to construction design

    E-Print Network [OSTI]

    Soto, Leticia, S.M. Massachusetts Institute of Technology

    2007-01-01

    Delays and cost overruns are the rule rather than the exception in the construction industry. Design changes due to lack of constructability late in the construction phase generating costly ripple effect which create delay ...

  8. Construction of problemsolving methods as parametric design

    E-Print Network [OSTI]

    ten Teije, Annette

    Construction of problem­solving methods as parametric design A. ten Teije 1 , F. van Harmelen 2 , A of the functionality of problem solving methods that allows us to view the construction of problem solvers for parametric design, we use propose­critique­modify for the automated configuration of problem solving methods

  9. 16.6 Building Design Standards Page 1 of 8 Building Design Standards

    E-Print Network [OSTI]

    Hung, I-Kuai

    16.6 Building Design Standards Page 1 of 8 Building Design Standards Original Implementation: July 21, 2009 Last Revision: July 28, 2015 1. Statement of purpose This standard provides the building designer with general guidance regarding the university's intent to develop a campus of buildings having

  10. Sustainable Design and Green Building Toolkit

    E-Print Network [OSTI]

    Sustainable Design and Green Building Toolkit F O R L O C A L G O V E R N M E N T S EPA 904B10001 | June 2010 #12;Disclaimer The Sustainable Design and Green Building Toolkit for Local Governments presented at non-EPA Web sites, or guarantee the validity of the information provided. iSustainable Design

  11. Landscape Design, Construction and Management Concentration

    E-Print Network [OSTI]

    Isaacs, Rufus

    plant production, landscape design, construction and maintenance, marketing, management: HRT 213 (2) Landscape Maintenance HRT 213L(1) Landscape Maintenance Field Lab HRT 214 (2) Landscape and Turfgrass Business Operations HRT 219 (2) Landscape CAD HRT 220 (3) Annual

  12. Outsourcing the Design of Structural Building Components

    E-Print Network [OSTI]

    Swearingin, Adam V.

    2008-05-16

    . This project contains an examination of the tasks associated with the design of structural building components. These tasks are evaluated to determine the feasibility of outsourcing any or all “core competencies” to a consultant which employs design...

  13. Design for Energy Efficiency in Residential Buildings 

    E-Print Network [OSTI]

    Song, M.; Zhang, Y.; Yang, G.

    2006-01-01

    This paper presents the thermal design and heating design of an energy saving residential building in Beijing where the owners lived until 2004. Results show the advantages and disadvantages of a household-based heating mode by natural gas. Based...

  14. CIV498 Design Project Winter 2016 Project Title: Building Science (Sustainable building design and energy

    E-Print Network [OSTI]

    Toronto, University of

    emissions from burning fossil fuels at buildings and at thermal electrical generation for building in the building's thermal envelope and electrical consuming systems up front to minimize thermal and electrical Building-as-a-System principles. Using a basic architectural design provided the students will work

  15. High Performance Sustainable Building Design RM

    Office of Environmental Management (EM)

    High Performance Sustainable Building Design Review Module March 2010 CD-0 O High 0 This Re Les OFFICE OF h Perform CD-1 eview Module ssons learned f F ENVIRON Standard R mance Su...

  16. Canister storage building (CSB) safety analysis report phase 3: Safety analysis documentation supporting CSB construction

    SciTech Connect (OSTI)

    Garvin, L.J.

    1997-04-28

    The Canister Storage Building (CSB) will be constructed in the 200 East Area of the U.S. Department of Energy (DOE) Hanford Site. The CSB will be used to stage and store spent nuclear fuel (SNF) removed from the Hanford Site K Basins. The objective of this chapter is to describe the characteristics of the site on which the CSB will be located. This description will support the hazard analysis and accident analyses in Chapter 3.0. The purpose of this report is to provide an evaluation of the CSB design criteria, the design's compliance with the applicable criteria, and the basis for authorization to proceed with construction of the CSB.

  17. Improving the Design-Construction Interface Proceedings IGLC '98

    E-Print Network [OSTI]

    Tommelein, Iris D.

    "and those that produce "waste"during the design and construction processes. This paper describesImproving the Design-Construction Interface Proceedings IGLC '98 IMPROVING THE DESIGN-CONSTRUCTION, constructive aspects and quality standards are defined during the design phase. However, this important phase

  18. The design of a panelized roof system for residential construction

    E-Print Network [OSTI]

    Dentz, Jordan Lewis

    1991-01-01

    The cost of housing in the U.S. continues to rise faster than household income. Innovative building materials and construction technologies have the potential to reduce housing construction costs. One strategy to do this ...

  19. Sacks R. (1998), `Issues in the Development and Implementation of a Building Project Model for an Automated Building System', International Journal of Construction Information Technology, Salford University, Salford

    E-Print Network [OSTI]

    Sacks, Rafael

    1998-01-01

    of an Automated, Computer Integrated Building Realization System is to automatically generate all. Keywords: Building Project Model, Computer Integrated Construction, Automated Building System. INTRODUCTION for an Automated Building System', International Journal of Construction Information Technology, Salford University

  20. Examination of Process Implementation of Evidence-based Design Initiatives on United States Army Medical Construction 

    E-Print Network [OSTI]

    Marsh, Glenn Edward

    2011-08-08

    Facilities Design and Construction Criteria NO Environment of Care ? US 2007 PARTIAL Design & Implementation Guide 2007 PARTIAL NFPA 99: Standard for Health Care Facilities PARTIAL NFPA 101?: Life Safety Code PARTIAL NFPA 101A: Guide on Alternative... Approaches to Life Safety PARTIAL Federal LEED program NO UFC 4-010-01 Unified Facilities Criteria (UFC) DoD Minimum Antiterrorism Standards for Buildings NO UFC 4-023-03 Unified Facilities Criteria (UFC) Design of Buildings to Resist Progressive...

  1. Building America Case Study: Evaluation of Ventilation Strategies in New Construction Multifamily Buildings, New York, New York (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the 'fresh' air is coming from is gaining significance as air-tightness standards for enclosures become more stringent, and the 'normal leakage paths through the building envelope' disappear. CARB researchers have found that the majority of high performance, new construction, multifamily housing in the Northeast use one of four general strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, and the assumption is that products will perform similarly in the field. Proper application involves matching expected performance at expected building pressures, but there is no guarantee that those conditions will exist consistently in the finished building. This research effort, which included several weeks of building pressure monitoring, sought to provide field validation of system performance. The performance of four substantially different strategies for providing make-up air to apartments was evaluated.

  2. Text-Alternative Version of Building America Webinar: New Construction Hybrid-Ductless Heat Pumps Study

    Broader source: Energy.gov [DOE]

    Text version of the Building America June 24 Webinar: New Construction Hybrid-Ductless Heat Pumps Study.

  3. Life-Cycle Evaluation of Concrete Building Construction as a Strategy for Sustainable Cities

    SciTech Connect (OSTI)

    Stadel, Alexander; Gursel, Petek; Masanet, Eric

    2012-01-18

    Structural materials in commercial buildings in the United States account for a significant fraction of national energy use, resource consumption, and greenhouse gas (GHG) emissions. Robust decisions for balancing and minimizing these various environmental effects require that structural materials selections follow a life-cycle, systems modeling approach. This report provides a concise overview of the development and use of a new life-cycle assessment (LCA) model for structural materials in U.S. commercial buildings?the Berkeley Lab Building Materials Pathways (B-PATH) model. B-PATH aims to enhance environmental decision-making in the commercial building LCA, design, and planning communities through the following key features: (1) Modeling of discrete technology options in the production, transportation, construction, and end of life processes associated U.S. structural building materials; (2) Modeling of energy supply options for electricity provision and directly combusted fuels across the building life cycle; (3) Comprehensiveness of relevant building mass and energy flows and environmental indicators; (4) Ability to estimate modeling uncertainties through easy creation of different life-cycle technology and energy supply pathways for structural materials; and (5) Encapsulation of the above features in a transparent public use model. The report summarizes literature review findings, methods development, model use, and recommendations for future work in the area of LCA for commercial buildings.

  4. Design/build -- an option not a panacea

    SciTech Connect (OSTI)

    Coad, W.J. (McClure Engineering Associates, St. Louis, MO (United States))

    1994-03-01

    The heating, ventilating, and air conditioning (HVAC) industry is one whose mission is to provide control of the indoor environment for the thermal comfort and health of the occupants of a space or controlled environment for a process such as manufacturing or research. The disciplines of which the industry is composed include lenders, owners, developers, investors, operators, architects, engineers, contractors, tradesmen, mechanics, manufacturers, and technicians. The manner in which these various disciplines relate to one another or should relate to one another varies, depending upon the objectives of any particular project. The purpose of this article is to examine and discuss the author's views on the advantages that firms who possess both engineering and construction capabilities can bring to the delivery process. Such firms are normally referred to as design/build firms, and the contracts that include both the design engineering and contracting scope are called design/build contracts.

  5. Building the Next Generation of Parallel Applications: Co-Design...

    Office of Scientific and Technical Information (OSTI)

    Building the Next Generation of Parallel Applications: Co-Design Opportunities and Challenges. Citation Details In-Document Search Title: Building the Next Generation of Parallel...

  6. Solar Ready Buildings Planning Guide

    SciTech Connect (OSTI)

    Lisell, L.; Tetreault, T.; Watson, A.

    2009-12-01

    This guide offers a checklist for building design and construction to enable installation of solar photovoltaic and heating systems at some time after the building is constructed.

  7. Integrating constructability into conceptual structural design and optimization

    E-Print Network [OSTI]

    Horn, Abbigayle

    2015-01-01

    This thesis encourages interdisciplinary design exploration through consideration of constructability in conceptual structural design. Six new metrics are introduced to measure variability in structural components, impose ...

  8. www.facilities.ufl.edu BUSINESS AFFAIRS PLANNING DESIGN & CONSTRUCTION

    E-Print Network [OSTI]

    Slatton, Clint

    the process of "greening" its design & construction in 2001 using LEED v2.0 as the means of verifying that new, systems, equipment, and practices. Over time, many aspects of green design & construction have beenwww.facilities.ufl.edu BUSINESS AFFAIRS PLANNING DESIGN & CONSTRUCTION PDC PROJECT MANAGEMENT GUIDE

  9. Building design guidelines for solar energy technologies

    SciTech Connect (OSTI)

    Givoni, B.

    1989-01-01

    There are two main objectives to this publication. The first is to find out the communalities in the experience gained in previous studies and in actual applications of solar technologies in buildings, residential as well as nonresidential. The second objective is to review innovative concepts and products which may have an impact on future developments and applications of solar technologies in buildings. The available information and common lessons were collated and presented in a form which, hopefully, is useful for architects and solar engineers, as well as for teachers of solar architecture'' and students in Architectural Schools. The publication is based mainly on the collection and analysis of relevant information. The information included previous studies in which the performance of solar buildings was evaluated, as well as the personal experience of the Author and the research consultants. The state of the art, as indicated by these studies and personal experience, was summarized and has served as basis for the development of the Design Guidelines. In addition to the summary of the state of the art, as was already applied in solar buildings, an account was given of innovative concepts and products. Such innovations have occurred in the areas of thermal storage by Phase Change Materials (PCM) and in glazing with specialized or changeable properties. Interesting concepts were also developed for light transfer, which may enable to transfer sunlight to the core areas of large multi story nonresidential buildings. These innovations may have a significant impact on future developments of solar technologies and their applications in buildings. 15 refs., 19 figs., 3 tabs.

  10. Evaluation of Ventilation Strategies in New Construction Multifamily Buildings

    SciTech Connect (OSTI)

    Maxwell, S.; Berger, D.; Zuluaga, M.

    2014-07-01

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the "fresh" air is coming from is gaining significance as air-tightness standards for enclosures become more stringent. CARB researchers have found that most new high performance, multifamily housing in the Northeast use one of four strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, but there is no guarantee that those conditions will exist consistently in the finished building. In this research project, CARB evaluated the four ventilation strategies in the field to validate system performance.

  11. Developing an integrated building design tool by coupling building energy simulation and computational fluid dynamics programs

    E-Print Network [OSTI]

    Zhai, Zhiqiang, 1971-

    2003-01-01

    Building energy simulation (ES) and computational fluid dynamics (CFD) can play important roles in building design by providing essential information to help design energy-efficient, thermally comfortable and healthy ...

  12. Building America Webinar: Ventilation in Multifamily Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    multifamily buildings, including how to successfully implement those strategies through smart design, specification, and construction techniques. webinarventilationmultifamily...

  13. Panel assemblage for housing : some form and construction explorations for small buildings

    E-Print Network [OSTI]

    Borenstein, David Reed

    1984-01-01

    This thesis examines the consequences of building homes in a factory and explores viable construction alternatives using factory-made panels. The exploration considers panelized systems of dwelling construction and its ...

  14. 605september/october 2014, vol. 90, n 5 the forestry chronicle The use of environmentally friendly building materials has experienced slow growth within the residential construction mar-

    E-Print Network [OSTI]

    eco-friendly renewable materials in structures. These programs were targeted at reducing environmental impacts by integrating eco-friendly materials into the design and construction of buildings, including

  15. Energy Use and Design Options for Texas State Buildings 

    E-Print Network [OSTI]

    Katipamula, S.; O'Neal, D. L.

    1988-01-01

    was the reduction of energy use of all new buildings constructed for state agencies. The first phase of this program was to estimate the energy use of new buildings corresponding to current construction practices in state facilities and to make recommendations...

  16. Sustainable Building Design Training | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc JumpHeter BatterySolarfinMarketMember CorpSunvie SASandBuilding Design

  17. IEEE DESIGN AND TEST, SPECIAL ISSUE ON GREEN BUILDINGS 1 From Buildings to Smart Buildings Sensing and

    E-Print Network [OSTI]

    Simunic, Tajana

    IEEE DESIGN AND TEST, SPECIAL ISSUE ON GREEN BUILDINGS 1 From Buildings to Smart Buildings such as coal and natural gas, both of which have significant environmental impacts. While renewable energy. Furthermore, commercial buildings are increasingly be- coming mixed-use, that is, they now house both human

  18. The Design, Construction, and Operation of Long-Distance High...

    Open Energy Info (EERE)

    The Design, Construction, and Operation of Long-Distance High-Voltage Electricity Transmission Technologies Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  19. Seeking Information on Design and Construction of High-Performance...

    Broader source: Energy.gov (indexed) [DOE]

    Office has released a request for information seeking stakeholder input on the design and construction of tenant spaces that achieve high levels of energy efficiency in...

  20. Design, Construction, and Implementation of Novel Biofuel Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design, Construction, and Implementation of Novel Biofuel Production Capabilities in Filamentous Fungi March 26, 2015 Technology Area Review Kenneth S. Bruno Pacific Northwest...

  1. Co-design of Control Algorithm and Embedded Platformfor Building HVAC Systems

    E-Print Network [OSTI]

    Maasoumy, Mehdi; Zhu, Qi; Li, Cheng; Meggers, Forrest; Sangiovanni-Vincentelli, Alberto

    2013-01-01

    concerns worldwide. Smart buildings today have sophisticateding building energy consumption by designing smart control

  2. Impact of different building ventilation modes on occupant expectations of the main IEQ factors

    E-Print Network [OSTI]

    Kim, Jungsoo; de Dear, Richard

    2012-01-01

    Buildings. [4] USGBC. Green building design and constuction:reference guide for green building design and construction.Technical manual: green star office design & office as built

  3. Development of an integrated building design information interface 

    E-Print Network [OSTI]

    Punjabi, Sonia Arjun

    2005-08-29

    This research recognizes the need for building simulation/performance tools that can easily be integrated into the building design process. The study examines available simulation tools and attempts to determine why these ...

  4. Impacts of Some Building Design Parameters on Heat Pump Applications 

    E-Print Network [OSTI]

    Erdim, B.; Manioglu, G.

    2011-01-01

    . In this study; in order to provide energy conservation and climatic comfort in buildings, an approach which aims to control the energy consumption of heat pumps by controlling decisions related to building design parameters have been developed. For this purpose...

  5. A Multi-objective Approach to Balance Buildings Construction Cost and Energy Efficiency

    E-Print Network [OSTI]

    Hamadi, Yousseff

    A Multi-objective Approach to Balance Buildings Construction Cost and Energy Efficiency ´Alvaro Fialho 1 and Youssef Hamadi 2 and Marc Schoenauer 3 Abstract. The issue of energy efficiency of buildings energy-efficient the building, the more expensive it is to be built. One must thus find a compromise be

  6. Designing and Building Houses that are Solar Ready | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    after initial construction is completed can save time and money by following new house Solar Ready design guidelines. Solar Ready houses are designed and built with integrated...

  7. Building energy calculator : a design tool for energy analysis of residential buildings in Developing countries

    E-Print Network [OSTI]

    Smith, Jonathan Y. (Jonathan York), 1979-

    2004-01-01

    Buildings are one of the world's largest consumers of energy, yet measures to reduce energy consumption are often ignored during the building design process. In developing countries, enormous numbers of new residential ...

  8. Recharging the facade : designing and constructing novel BIPV assemblies

    E-Print Network [OSTI]

    Keller, Alexander Freimark

    2013-01-01

    Building Integrated Photovoltaics (BIPV) have been the subject of research and design applications for several decades. While some large-scale applications have been realized, prohibitively high costs and multiple technical ...

  9. Winchester/Camberley Homes New Construction Test House Design, Construction, and Short-Term Testing in a Mixed-Humid Climate

    SciTech Connect (OSTI)

    Mallay, D.; Wiehagen, J.; Wood, A.

    2012-10-01

    The NAHB Research Center partnered with production builder Winchester/Camberley Homes to build a new construction test house in the mixed-humid climate zone of Silver Spring, MD in June 2011. The goal for this house was to improve energy efficiency by 30% over the Building America B10 benchmark through an optimized energy solutions package design that could be constructed on a production basis. This report outlines the features of this house, discusses the energy efficient design, and reports on short-term testing results.

  10. Preplanning Method for Multi-Story Building Construction using Line of Balance Proceedings IGLC '98

    E-Print Network [OSTI]

    Tommelein, Iris D.

    of the method support lean construction concepts, such as waste elimination, variances minimization, flexible ones, which have float time. It means that the planning construction incorporates wastes whatPreplanning Method for Multi-Story Building Construction using Line of Balance Proceedings IGLC '98

  11. Passive Solar Building Design and Solar Thermal Space Heating Webinar

    Broader source: Energy.gov [DOE]

    Webinar of National Renewable Energy Laboratory (NREL) Senior Engineer Andy Walker's presentation about passive solar building design and solar thermal space heating technologies and applications.

  12. Why Do Building Owners Invest in Bicycle-Oriented Design?

    E-Print Network [OSTI]

    Orrick, Phyllis; Trapenberg Frick, Karen; Ragland, David R

    2011-01-01

    Building Owners Invest in Bicycle-Oriented Design? Phyllisof California, Berkeley ISSUE Bicycle infrastructure designhas largely emphasized bicycle lanes and paths, with little

  13. Addendum to the Contract for the Construction of the Auxiliary Buildings of the 300 GeV Accelerator Adjudication of a Contract for the Construction of a Storage Building

    E-Print Network [OSTI]

    1973-01-01

    Addendum to the Contract for the Construction of the Auxiliary Buildings of the 300 GeV Accelerator Adjudication of a Contract for the Construction of a Storage Building

  14. "Designing equipment and buildings to more quickly respond to occupant

    E-Print Network [OSTI]

    Zhigilei, Leonid V.

    prediction system Energy Efficient Smart Buildings In the near future, intelligent buildings"Designing equipment and buildings to more quickly respond to occupant behavior." Kamin Whitehouse University of Virginia Charlottesville, VA 434.982.2211 Whitehouse Research Group Our group is creating smart

  15. Achieving 50% Energy Savings in Office Buildings, Advanced Energy Design Guides: Office Buildings (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    This fact sheet summarizes recommendations for designing new office buildings that result in 50% less energy use than conventional designs meeting minimum code requirements. The recommendations are drawn from the Advanced Energy Design Guide for Small to Medium Office Buildings, an ASHRAE publication that provides comprehensive recommendations for designing low-energy-use office buildings with gross floor areas up to 100,000 ft2 (see sidebar). Designed as a stand-alone document, this fact sheet provides key principles and a set of prescriptive design recommendations appropriate for smaller office buildings with insufficient budgets to fully implement best practices for integrated design and optimized performance. The recommendations have undergone a thorough analysis and review process through ASHRAE, and have been deemed the best combination of measures to achieve 50% savings in the greatest number of office buildings.

  16. Energy Efficiency and Sustainable Construction Standards for Public Buildings

    Broader source: Energy.gov [DOE]

    Major facility projects must include Georgia products such that not less than 10% of all building materials used in a project are harvested, extracted or manufactured in Georgia, where such...

  17. Building optimization : an integrated approach to the design of tall buildings

    E-Print Network [OSTI]

    Coleman, Keith LaMar

    2007-01-01

    There has been much research done on building optimization that deal with the issues within specific individual fields, such as architecture, structural engineering, and construction engineering. However, in practical ...

  18. Proposal of CSP based Network Design and Construction

    E-Print Network [OSTI]

    Fukunaga, Chikara

    Proposal of CSP based Network Design and Construction Session:Network and Protocol Short PaperWire network. The design was based on a formal method using CSP ( Communicating Sequential Processes]. In this paper we discuss the reason why we use CSP as a formal design method for the router-network system

  19. Passive Solar Building Design Basics | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The difference between a passive solar home and a conventional home is design. Passive solar homes and other buildings are designed to take advantage of the local climate. Passive...

  20. Proposal for the award of a contract for civil-engineering and steel work for the construction of Building 245

    E-Print Network [OSTI]

    2015-01-01

    Proposal for the award of a contract for civil-engineering and steel work for the construction of Building 245

  1. Adjudication of the Building Construction Work for the Laboratories and Offices of the 300 GeV Programme

    E-Print Network [OSTI]

    1971-01-01

    Adjudication of the Building Construction Work for the Laboratories and Offices of the 300 GeV Programme

  2. Adjudication of a Contract for the Civil Engineering Work for the Construction and Extension of Buildings on the Prévessin Site

    E-Print Network [OSTI]

    1977-01-01

    Adjudication of a Contract for the Civil Engineering Work for the Construction and Extension of Buildings on the Prévessin Site

  3. Simple procedure for schematic design of passive solar buildings

    SciTech Connect (OSTI)

    Wray, W.O.; Kosiewicz, C.E.

    1984-01-01

    A simple procedure for use during the schematic phase of passive solar building design is presented in this article. The procedure is quantitative and accurate enough to insure that designs based on the provided starting point values of the primary building parameters will be cost effective.

  4. Green Libraries Are More Than Just Buildings

    E-Print Network [OSTI]

    Aulisio, George J.

    2013-01-01

    and measurable green building design, construction,Green Building Council (USGBC) certification that stands for Leadership in Energy and Environmental Design.

  5. Design Build: Should the U.S. Army Corps of Engineers-Kansas City District Continue to Use this Form of Project Delivery Method?

    E-Print Network [OSTI]

    Fernandez, Eduardo H.

    2008-05-16

    Design Build (DB) is a system in which the contractor is solely responsible for the design and construction of the project. The DB system differs from the Design, Bid, Build, (DBB) system in which the owner contracts with a design professional...

  6. Harris County- Green Building Tax Abatement for New Commercial Construction (Texas)

    Broader source: Energy.gov [DOE]

    In 2008, the Harris County Commissioners Court adopted guidelines for partial tax abatements for new construction of commercial LEED-certified buildings. The tax abatement was renewed in 2009, and...

  7. The systems phenomenon in buildings and its application to construction specifications

    E-Print Network [OSTI]

    Skendzel, Richard A. (Richard Adam)

    1994-01-01

    This thesis proposes that the holistic quality of a building can be improved by modifying the way that it is represented in the specifications document. It develops a construction specifications format based on a substantive ...

  8. EA-0820: Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to construct and operate two mixed (both radioactive and hazardous) waste storage facilities (Buildings 7668 and 7669) in accordance with...

  9. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS DOOR AND FRAMES

    E-Print Network [OSTI]

    Arnold, Jonathan

    have welded joints. B. Knock down door frames (factory pre-finished steel door frames which exception below for UGA Housing). F. For UGA Housing Only (New Construction) i. Design Professional for tested, labeled door construction for Project. 6) Lite/lock conflicts: follow door manufacturer

  10. Occupant satisfaction with indoor environmental quality in green buildings

    E-Print Network [OSTI]

    Abbaszadeh, S.; Zagreus, Leah; Lehrer, D.; Huizenga, C

    2006-01-01

    While it has brought green design and construction practicesand Environmental Design (LEED) Green Building Rating Systemof sustainable design, we question how green buildings are

  11. Building America Webinar: New Construction Hybrid-Ductless Heat...

    Energy Savers [EERE]

    Construction Hybrid-Ductless Heat Pump Study (Resistance is Futile) Bruce Carter, Tacoma Power Michael Lubliner, WSU Energy Program June 24, 2015 Sponsored by the BPA E3T Program...

  12. Port Graham Community Building Biomass Heating Design Project

    SciTech Connect (OSTI)

    Norman, Patrick; Sink, Charles

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry

  13. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 2, Technical report

    SciTech Connect (OSTI)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-08-01

    This is the second volume of the Phase 1 report and discusses the 10 tasks performed in Phase 1. The objective of this research is to develop a methodology for setting energy design targets to provide voluntary guidelines for the buildings industry. The whole-building energy targets project is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to encourage the construction of energy-efficient buildings by informing designers and owners about cost-effective goals for energy use in new commercial buildings. The outcome of this research will be a flexible methodology for setting such targets. The tasks are listed and discussed in this report as follows: Task 1 - Develop Detailed Project Goals and Objectives; Task 2 - Establish Buildings-Industry Liaison; Task 3 - Develop Approaches to the Energy Targets Model, Building Operations, and Climate; Task 4 - Develop an Approach for Treating Economic Considerations; Task 5 - Develop an Approach for Treating Energy Sources; Task 6 - Collect Energy-Use Data; Task 7 - Survey Energy Expert Opinion; Task 8 - Evaluation Procedure Specification and Integration; Task 9 - Phase 1 Report Development; and Task 10 - Phase 1 Review Planning.

  14. Building America Webinar: New Construction Hybrid-Ductless Heat Pumps

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels| Department of Energy America: Research - BuildingUnveiled

  15. Comparative Analysis of Entropy Algorithms to Determine the Most Effective Technique for Measuring Complexity in Building Construction 

    E-Print Network [OSTI]

    Xiao, Chao

    2015-08-03

    advanced methods and concepts for construction industry. It also has raised valid questions: Is construction really complex or just complicated? More importantly, how to measure the complexity in building construction systems? This dissertation is based...

  16. Lead Management Program for Building Maintenance and Construction Projects Office of Environmental Health and Safety

    E-Print Network [OSTI]

    Chan, Hue Sun

    )F & S 8 3.2.3 MANAGERS, MECHANICAL OPERATIONS AND MAINTENANCE 9 3.2.4 PROPERTY MANAGERS 10 3.2.5 MANAGERLead Management Program for Building Maintenance and Construction Projects Office of Environmental Maintenance and Construction Projects Page 2 of 22 UNIVERSITY OF TORONTO ­ Office of Environmental Health

  17. Applicability of Logistics Management in Lean Construction: a Case Study Approach in Brazilian Building Companies

    E-Print Network [OSTI]

    Tommelein, Iris D.

    Applicability of Logistics Management in Lean Construction: a Case Study Approach in Brazilian Building Companies Proceedings IGLC-7 147 APPLICABILITY OF LOGISTICS MANAGEMENT IN LEAN CONSTRUCTION Cardoso2 ABSTRACT Logistics management concepts and tools currently have a great value for several

  18. Designing and Building File-Folder Bridges

    E-Print Network [OSTI]

    Bowen, James D.

    with a group of our undergraduate engineering students to run a popsicle stick bridge-building contest for 11th into teams, and each team received a pile of popsicle sticks and a hot glue gun. Within a specified period

  19. )-Optimal Supersaturated Designs Constructed From Incomplete Block Designs

    E-Print Network [OSTI]

    Nguyen, Nam-Ky

    of runs. Some examples of SDs are Plackett­Burman designs (Plackett and Burman 1946), p- efficient designs- fecting the thermal performance of project homes: wall insula- tion (R1 or R2), roof insulation (R2.5 or R

  20. Landfill Instability and Its Implications Operation, Construction, and Design

    E-Print Network [OSTI]

    on geotechnical and stability analyses for the design of landfills and remedial closures. It is the mostLandfill Instability and Its Implications for Operation, Construction, and Design By: W. Douglas landfill waste slide, a 300,000 cubic yard landfill failure involving a geosynthetic clay liner, and a 100

  1. Building Information Modeling (BIM), Utilized During the Design and Construction Phase of a Project Has the Potential to Create a Valuable Asset in Its Own Right ('BIMASSET') at Handover that in Turn Enhances the Value of the Development 

    E-Print Network [OSTI]

    Patrick, R.; Munir, M.; Jeffrey, H.

    2012-01-01

    the economic performance of a property/investment. 2.4 SIMILARITY WITH OTHER INDUSTRIES (IN THEORY AND PRACTICE) Similarities can be found with the IT and manufacturing industries. Theoretically, Lean Production goes in line with BIM methodology. BIM... is generally seen as a promising approach that would aid in achieving the principles of lean construction by reducing waste, improving efficiency, enhancing information management and improving communication (Gerber et al., 2010). The work of Khanzode et al...

  2. Energy Use Intensity and its Influence on the Integrated Daylighting Design of a Large Net Zero Energy Building: Preprint

    SciTech Connect (OSTI)

    Guglielmetti , R.; Scheib, J.; Pless, S. D.; Torcellini , P.; Petro, R.

    2011-03-01

    Net-zero energy buildings generate as much energy as they consume and are significant in the sustainable future of building design and construction. The role of daylighting (and its simulation) in the design process becomes critical. In this paper we present the process the National Renewable Energy Laboratory embarked on in the procurement, design, and construction of its newest building, the Research Support Facility (RSF) - particularly the roles of daylighting, electric lighting, and simulation. With a rapid construction schedule, the procurement, design, and construction had to be tightly integrated; with low energy use. We outline the process and measures required to manage a building design that could expect to operate at an efficiency previously unheard of for a building of this type, size, and density. Rigorous simulation of the daylighting and the electric lighting control response was a given, but the oft-ignored disconnect between lighting simulation and whole-building energy use simulation had to be addressed. The RSF project will be thoroughly evaluated for its performance for one year; preliminary data from the postoccupancy monitoring efforts will also be presented with an eye toward the current efficacy of building energy and lighting simulation.

  3. Buildings","Year Constructed"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: AlternativeMonthly","10/2015"Monthly","10/2015" ,"Release7 Relative Standard ErrorsYear Jan Feb MarA6. Building Size,1.B5.B9.

  4. Table B8. Year Constructed, Number of Buildings, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: AlternativeMonthly","10/2015"Monthly","10/2015" ,"Release7CubicthroughtheSeptember 24,4,630.22PrimaryB6. Building Size,

  5. Co-design of Control Algorithm and Embedded Platformfor Building HVAC Systems

    E-Print Network [OSTI]

    Maasoumy, Mehdi; Zhu, Qi; Li, Cheng; Meggers, Forrest; Sangiovanni-Vincentelli, Alberto

    2013-01-01

    A design flow for building automation and control systems,”Development of building automation and control systems,”systems as part of a Building Automation System (BAS). The

  6. Technical Support Document: Development of the Advanced Energy Design Guide for Small Office Buildings

    SciTech Connect (OSTI)

    Jarnagin, Ronald E.; Liu, Bing; Winiarski, David W.; McBride, Merle F.; Suharli, L.; Walden, D.

    2006-11-30

    This Technical Support Document (TSD) describes the process and methodology for the development of the Advanced Energy Design Guide for Small Office Buildings (AEDG-SO), a design guidance document intended to provide recommendations for achieving 30% energy savings in small office buildings over levels contained in ANSI/ASHRAE/IESNA Standard 90.1-1999, Energy Standard for Buildings Except Low-Rise Residential Buildings. The AEDG-SO is the first in a series of guides being developed by a partnership of organizations, including the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE), the American Institute of Architects (AIA), the Illuminating Engineering Society of North America (IESNA), the New Buildings Institute (NBI), and the U.S. Department of Energy (DOE). Each of the guides in the AEDG series will provide recommendations and user-friendly design assistance to designers, developers and owners of small commercial buildings that will encourage steady progress towards net-zero energy buildings. The guides will provide prescriptive recommendation packages that are capable of reaching the energy savings target for each climate zone in order to ease the burden of the design and construction of energy-efficient small commercial buildings The AEDG-SO was developed by an ASHRAE Special Project committee (SP-102) made up of representatives of each of the partner organizations in eight months. This TSD describes the charge given to the committee in developing the office guide and outlines the schedule of the development effort. The project committee developed two prototype office buildings (5,000 ft2 frame building and 20,000 ft2 two-story mass building) to represent the class of small office buildings and performed an energy simulation scoping study to determine the preliminary levels of efficiency necessary to meet the energy savings target. The simulation approach used by the project committee is documented in this TSD along with the characteristics of the prototype buildings. The prototype buildings were simulated in the same climate zones used by the prevailing energy codes and standards to evaluate energy savings. Prescriptive packages of recommendations presented in the guide by climate zone include enhanced envelope technologies, lighting and day lighting technologies and HVAC and SWH technologies. The report also documents the modeling assumptions used in the simulations for both the baseline and advanced buildings. Final efficiency recommendations for each climate zone are included, along with the results of the energy simulations indicating an average energy savings over all buildings and climates of approximately 38%.

  7. Design and Build- Cost-Effective Energy Conservation: An Opportunity for the Competitive Market 

    E-Print Network [OSTI]

    McGeown, D. I.

    1995-01-01

    - COST-EFFECTIVE ENERGY CONSERVATION An Opportunity for the Competitive Market by: David l. McGeown, P.E, C. Eng. ABSTRACT This paper e>''Pands on concepts presented at the World Energy Congress and DAIDSM earlier this year. In the light of recent... that an adaptation of the design and build method of construction offers many of the answers needed for cost effective implementation. The Design & Build contract has most of the key features needed in an energy conservation project. It is a proven method...

  8. Social Game for Building Energy Efficiency: Incentive Design

    E-Print Network [OSTI]

    Sastry, S. Shankar

    consumption of buildings, both residential and commercial, accounts for approximately 40% of all energy usageSocial Game for Building Energy Efficiency: Incentive Design Lillian J. Ratliff, Ming Jin, Ioannis of a social game encouraging energy efficient behavior in occupants by dis- tributing points which determine

  9. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    SciTech Connect (OSTI)

    CROWE, R.D.; PIEPHO, M.G.

    2000-03-23

    This document provided the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report''. All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

  10. The Emphasis on Ecological Design for High-rise Buildings 

    E-Print Network [OSTI]

    Xu, F.; Zhang, G.; Xie, M.

    2006-01-01

    Along with the rapid development of urbanization, there are more and more high-rise buildings in cities. Meanwhile, the negative impacts of high-rise buildings on the urban environment have become more and more serious. The ecological design of high...

  11. A HIERARCHICAL DESIGN OPTIMIZATION FRAMEWORK FOR BUILDING PERFORMANCE ANALYSIS

    E-Print Network [OSTI]

    Papalambros, Panos

    A HIERARCHICAL DESIGN OPTIMIZATION FRAMEWORK FOR BUILDING PERFORMANCE ANALYSIS Ruchi Choudhary1 the consistency between decisions made at various points during building performance analysis. Analytical Target values of performance goals compatible with one another. Application to the energy analysis of a three

  12. Experimental Response of Buildings Designed with Metallic Structural Fuses. II

    E-Print Network [OSTI]

    Bruneau, Michel

    floor vibrations in buildings designed per the structural fuse concept. The seismic isolation device 0733-9445 2009 135:4 394 CE Database subject headings: Structural design; Steel structures; Seismic design; Seismic effects; Damping; Inelasticity; Ductility; Shake table tests. Introduction Passive energy

  13. Considering Climate Change in Road and Building Design

    E-Print Network [OSTI]

    - time maximum 3-second wind speed. Cur- rent climate models do not generate this informationConsidering Climate Change in Road and Building Design First Infrastructure and Climate Network in infrastruc- ture design? How can engineers design for a changing climate? How can climate scien- tists better

  14. Construction of Building 9201-1 (Alpha 1)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit the followingConcentrating SolarConstruction Review Basic EnergyPrinceton1

  15. Construction of Building 9201-1 (Alpha 1) - part 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit the followingConcentrating SolarConstruction Review Basic EnergyPrinceton12

  16. Property:Building/YearConstruction1 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceIIInformationEnergy InformationInformation Total JumpYearConstruction1

  17. Construction and Building Materials, 84, 409-415, 2015, http://dx.doi.org/10.1016/j.conbuildmat.2015.03.082 Design and Performance of Ternary Blend High-Volume Fly Ash Concretes of

    E-Print Network [OSTI]

    Bentz, Dale P.

    .conbuildmat.2015.03.082 Design and Performance of Ternary Blend High-Volume Fly Ash Concretes of Moderate Slump) with a supplementary cementitious material, such as fly ash. This paper presents mixture proportions and measured properties for a series of six high-volume fly ash (HVFA) concretes, five containing a ternary component

  18. Schematic design of distributed mass damping systems for tall buildings

    E-Print Network [OSTI]

    Silbiger, Jason Stahl

    2014-01-01

    As new high-rises grow taller and more slender, the design of tall buildings becomes heavily constrained by the control of lateral displacements and accelerations due to dynamic excitations. This has led to the development ...

  19. DOE Zero Energy Ready Home Case Study: Heirloom Design Build...

    Energy Savers [EERE]

    rigid foam under slab; sealed attic with R-28 ocsf under roof deck; 22.8 SEER; 12.5 HSPF heat pump. DOE Zero Energy Ready Home Case Study: Heirloom Design Build, Atlanta, GA More...

  20. Commercial New Construction

    Broader source: Energy.gov [DOE]

    Efficiency Vermont offers support to encourage energy efficient design for new construction. Efficiency Vermont will provide support for new commercial buildings, including technical assistance at...

  1. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL THERMAL & MOISTURE PROTECTION REQUIREMENTS ROOF DRAINS & ROOFS

    E-Print Network [OSTI]

    Arnold, Jonathan

    UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL THERMAL & MOISTURE. ii. General #12;UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL

  2. Entrepreneurial Strategies and New Forms of Rationalisation of Production in the Building Construction Sector of Brazil and France

    E-Print Network [OSTI]

    Tommelein, Iris D.

    Construction Sector of Brazil and France Proceedings IGLC-7 369 ENTREPRENEURIAL STRATEGIES AND NEW FORMS OF RATIONALISATION OF PRODUCTION IN THE BUILDING CONSTRUCTION SECTOR OF BRAZIL AND FRANCE Francisco F. Cardoso1 in France and Brazil, in the light of strategies of the building construction firms. The above mentioned

  3. Analyzing Design Heating Loads in Superinsulated Buildings

    SciTech Connect (OSTI)

    Arena, Lois

    2015-06-16

    The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings (CARB) worked with the EcoVillage cohousing community in Ithaca, New York, on the Third Residential EcoVillage Experience neighborhood. This communityscale project consists of 40 housing units—15 apartments and 25 single-family residences. Units range in size from 450 ft2 to 1,664 ft2 and cost from $80,000 for a studio apartment to $235,000 for a three- or four-bedroom single-family home. For the research component of this project, CARB analyzed current heating system sizing methods for superinsulated homes in cold climates to determine if changes in building load calculation methodology should be recommended. Actual heating energy use was monitored and compared to results from the Air Conditioning Contractors of America’s Manual J8 (MJ8) and the Passive House Planning Package software. Results from that research indicate that MJ8 significantly oversizes heating systems for superinsulated homes and that thermal inertia and internal gains should be considered for more accurate load calculations.

  4. THE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC

    E-Print Network [OSTI]

    Washington at Seattle, University of

    , with relatively low ~by FRC standards! megawatt-level RMF input powers. After initial forma- tion, the plasmaTHE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC PERFORMANCE K. E. MILLER. MILROY, Z. A. PIETRZYK, and G. C. VLASSES University of Washington Redmond Plasma Physics Laboratory

  5. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL UTILITIES REQUIREMENTS

    E-Print Network [OSTI]

    Arnold, Jonathan

    UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL UTILITIES REQUIREMENTS JANUARY 16, 2015 33 00 001 33 00 00 GENERAL UTILITIES REQUIREMENTS 1. GENERAL A. Related sections: i. 01 41 26.02 ­ Utility Information & Locate ii. 23 05 19 ­ Meters and Gages iii

  6. China Building Design Consultants | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,CammackFLIR JumpMaine:WestTexas: Energy ResourcesRenewableChimayo,Building

  7. Designing buildings for disassembly : stimulating a change in the designer's role

    E-Print Network [OSTI]

    Gaïsset, Ines (Ines Sophie Maya)

    2011-01-01

    Today's industrial infrastructure in the building field results in specific types of problems with current design strategies. Here, the potential of Design for Disassembly (DfD) is explored as a solution for a new type of ...

  8. Designing and Building a Graphical Model Library in Standard ML

    E-Print Network [OSTI]

    Murphy, Kevin Patrick

    Designing and Building a Graphical Model Library in Standard ML Clint Morgan December 2004 Abstract This paper discusses several design considerations for a probabilistic graphical model library. The library, dubbed GM, currently only contains a small subset of desirable features for such a library. In particular

  9. Informing design decisions : an approach to corporate building design

    E-Print Network [OSTI]

    Maxwell, Marc A

    1985-01-01

    This thesis is an investigation into design methodologies. How do we, as designers, prepare ourselves for decision making and evaluate our assumptions and decisions? The intent is to employ this information as a basis for ...

  10. Towards Production Control on Multi-Story Building Construction Sites Proceedings IGLC-7 313

    E-Print Network [OSTI]

    Tommelein, Iris D.

    was managed using electronic spreadsheets. This work shows that production planning and control can planning with line of balance and short term planning. The production control method uses the Last PlannerTowards Production Control on Multi-Story Building Construction Sites Proceedings IGLC-7 313

  11. Building America Case Study: Field Testing of Compartmentalization Methods for Multifamily Construction (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01

    The 2012 IECC has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure for both single family and multifamily construction in Climate Zones 3-8. Other programs (LEED, ASHRAE 189, ASHRAE 62.2) have similar or tighter compartmentalization requirements, thus driving the need for easier and more effective methods of compartmentalization in multifamily buildings.

  12. Architecture earth-sheltered buildings. Design manual 1. 4

    SciTech Connect (OSTI)

    Not Available

    1984-03-01

    Design guidance is presented for use by experienced engineers and architects. The types of buildings within the scope of this manual include slab-on-grade, partially-buried (bermed) or fully-buried, and large (single-story or multistory) structures. New criteria unique to earth-sheltered design are included for the following disciplines: Planning, Landscape Design, Life-Cycle Analysis, Architectural, Structural, Mechanical (criteria include below-grade heat flux calculation procedures), and Electrical.

  13. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIRMENTS & STANDARDS MAINTENANCE OF EXISTING CONDITIONS

    E-Print Network [OSTI]

    Arnold, Jonathan

    DEMOLITION 1. GENERAL A. Related sections: i. 01 74 19 ­ Construction Waste Management & Disposal ii. 10 44 UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIRMENTS & STANDARDS MAINTENANCE OF EXISTING be issued by the Owner. #12;UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIRMENTS & STANDARDS

  14. Building-Integrated Photovoltaic Designs for Commercial and Institutional Structures: A Sourcebook for Architects

    SciTech Connect (OSTI)

    2009-01-18

    Sourcebook for architects on building-integrated photovoltaic designs covering commercial and institutional structures.

  15. Design & Construct New Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department8, 20153Danielthrough theKDesert Peak EGS Project DOEDesign

  16. Design, Construction and Use of the FISH Server

    E-Print Network [OSTI]

    Kågström, Bo

    3 High Performance Computing Center North (HPC2N), Ume°a University, SE-901 87 Ume°a, SwedenDesign, Construction and Use of the FISH Server Jeanette T°angrot1,2 , Lixiao Wang1 , Bo K°agstr¨om2,3 , and Uwe H. Sauer1 1 Ume°a Centre for Molecular Pathogenesis 2 Department of Computing Science

  17. SPALLATION NEUTRON SOURCE RING-DESIGN AND CONSTRUCTION SUMMARY.

    SciTech Connect (OSTI)

    WEI,J.

    2005-05-16

    After six years, the delivery of components for the Spallation Neutron Source (SNS) accumulator ring (AR) and the transport lines was completed in Spring 2005. Designed to deliver 1.5 MW beam power (1.5 x 10{sup 14} protons of 1 GeV kinetic energy at a repetition rate of 60 Hz), stringent measures were implemented in the fabrication, test, and assembly to ensure the quality of the accelerator systems. This paper summarizes the design, R&D, and construction of the ring and transport systems.

  18. Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility; Preprint

    SciTech Connect (OSTI)

    Langner, R.; Deru, M.; Zhivov, A.; Liesen, R.; Herron, D.

    2012-03-01

    This paper describes the integrated energy optimization process for buildings and building clusters and demonstrates this process for new construction projects and building retrofits. An explanation is given of how mission critical building loads affect possible site and source energy use reduction in Army buildings.

  19. Seismicity increase after the construction of the world's tallest building: An active blind fault beneath the Taipei 101

    E-Print Network [OSTI]

    Lin, Cheng-Horng

    be conducted because the safety of the high-rise building in the Taipei basin be comprehensively assessedSeismicity increase after the construction of the world's tallest building: An active blind fault] Seismic activity began to slightly increase during the construction but rose sharply upon the completion

  20. The Construction of Preference in Engineering Design and Implications for Green Products

    E-Print Network [OSTI]

    Papalambros, Panos

    ABSTRACT The Construction of Preference in Engineering Design and Implications for Green to designers; and that only some people have inconsistent preference for green products. (2 This dissertation incorporates the construction of preference into engineering design methodology

  1. Building & Fire Assist Director

    E-Print Network [OSTI]

    Buren Physical Safety (Electrical, Confined Space, Machinery, Fall Prevention) Construction & Remodel Design Review Lab / Shop Safety Surveys Regulated Building Materials Public Health (Food, Water, Pests

  2. Winchester/Camberley Homes New Construction Test House Design, Construction, and Short-Term Testing in a Mixed-Humid Climate

    SciTech Connect (OSTI)

    Mallav, D.; Wiehagen, J.; Wood, A.

    2012-10-01

    The NAHB Research Center partnered with production builder Winchester/Camberley Homes to build a DOE Building America New Construction Test House (NCTH). This single family, detached house, located in the mixed-humid climate zone of Silver Spring, MD, was completed in June 2011. The primary goal for this house was to improve energy efficiency by 30% over the Building America B10 benchmark by developing and implementing an optimized energy solutions package design that could be cost effectively and reliably constructed on a production basis using quality management practices. The intent of this report is to outline the features of this house, discuss the implementation of the energy efficient design, and report on short-term testing results. During the interactive design process of this project, numerous iterations of the framing, air sealing, insulation, and space conditioning systems were evaluated for energy performance, cost, and practical implementation. The final design featured numerous advanced framing techniques, high levels of insulation, and the HVAC system entirely within conditioned space. Short-term testing confirmed a very tight thermal envelope and efficient and effective heating and cooling. In addition, relevant heating, cooling, humidity, energy, and wall cavity moisture data will be collected and presented in a future long-term report.

  3. 1 INTRODUCTION Seismic design provisions in building codes aim

    E-Print Network [OSTI]

    Baker, Jack W.

    1 INTRODUCTION Seismic design provisions in building codes aim to provide adequate collapse safety uncertainty for collapse safety assessment. A variety of reliability methods are explored and compared behavior of its components and its assessment requires non- linear analysis models that capture large

  4. Designing and Building a Negotiating Automated Sarit Kraus \\Lambda

    E-Print Network [OSTI]

    Kraus, Sarit

    Designing and Building a Negotiating Automated Agent Sarit Kraus \\Lambda Department of Mathematics developed a general structure for a Negotiating Automated Agent that consists of five modules: a Prime than human players. Key Words: Automated Negotiations, Multi­Agent Environment, Game Playing, Local

  5. Designing Adaptive Lighting Control Algorithms for Smart Buildings and Homes

    E-Print Network [OSTI]

    Dasgupta, Partha

    Designing Adaptive Lighting Control Algorithms for Smart Buildings and Homes Yuan Wang Arizona State University Tempe, AZ, USA Email: Yuan.Wang.4@asu.edu Abstract-Artificial lighting is often the main lighting provision for workplaces. This paper describes algorithms for optimizing lighting control

  6. Technology Solutions Case Study: Evaluation of Ventilation Strategies in New Construction Multifamily Buildings, New York, New York

    SciTech Connect (OSTI)

    2014-09-01

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the "fresh" air is coming from is gaining significance as air-tightness standards for enclosures become more stringent, and the "normal leakage paths through the building envelope" disappear. Consortium for Advanced Residential Buildings researchers have found that the majority of high performance, new construction, multifamily housing in the Northeast use one of four general strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. This research effort included several weeks of building pressure monitoring to validate system performance of the different strategies for providing make-up air to apartments.

  7. Energy Efficiency and Sustainable Design in New School Construction

    Broader source: Energy.gov [DOE]

    The overall program is expected to fund 250 new or renovated school buildings, all of which will be required to abide by the sustainable building standard described above. Over 270 buildings have...

  8. Calculation of Nox Emissions Reductions from Energy Efficient Residential Building Construction in Texas 

    E-Print Network [OSTI]

    Haberl, J.; Culp, C.; Gilman, D.; Baltazar-Cervantes, J. C.; Yazdani, B.; Fitzpatrick, T.; Muns, S.; Verdict, M.

    2004-01-01

    severe sanctions if attainment is not reached by 2007. This paper provides an overview of the procedures that have been developed and used to calculate the electricity savings and NOx reductions from code-compliant residential construction in non...,000 ft2 single-family residence. ESL Code Traceable DOE-2 Simulation (Residential, Commercial, Industrial, Renewables) County-wide Electricity Use (w/ and w/o code) E-GRID Database Model For ERCOT, SERC, SPP, and WSCC Regions 1999 Building...

  9. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    SciTech Connect (OSTI)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  10. The Gemini Planet Imager: From Science to Design to Construction

    SciTech Connect (OSTI)

    Macintosh, B; Graham, J R; Palmer, D; Doyon, R; Dunn, J; Gavel, D; Larkin, J; Oppenheimer, B; Saddlemyer, L; Sivaramakrishnan, A; Wallace, J K; Bauman, B; Erickson, D; Marois, C; Poyneer, L; Soummer, R

    2008-07-01

    The Gemini Planet Imager (GPI) is a facility instrument under construction for the 8-m Gemini South telescope. It combines a 1500 subaperture AO system using a MEMS deformable mirror, an apodized-pupil Lyot coronagraph, a high-accuracy IR interferometer calibration system, and a near-infrared integral field spectrograph to allow detection and characterization of self-luminous extrasolar planets at planet/star contrast ratios of 10{sup -7}. I will discuss the evolution from science requirements through modeling to the final detailed design, provide an overview of the subsystems and show models of the instrument's predicted performance.

  11. Financing green buildings

    E-Print Network [OSTI]

    Pierce, Christopher John, S.M. Massachusetts Institute of Technology

    2013-01-01

    An emerging trend in real estate is the development of sustainable buildings, partially due to the huge environmental impact of the design, construction and operation of commercial buildings. This thesis provides a brief ...

  12. Dynamical decoupling sequence construction as a filter-design problem

    E-Print Network [OSTI]

    M. J. Biercuk; A. C. Doherty; H. Uys

    2011-04-23

    Over the past decade we have seen an explosion of demonstrations of quantum coherence in atomic, optical, and condensed matter systems. These developments have placed a new emphasis on the production of robust and optimal quantum control techniques in the presence of environmental noise. We discuss the use of dynamical decoupling as a form of open-loop quantum control capable of suppressing the effects of dephasing in quantum coherent systems. We introduce the concept of dynamical decoupling pulse-sequence construction as a filter-design problem, making connections with filter design from control theory and electrical engineering in the analysis of pulse-sequence performance for the preservation of the phase degree of freedom in a quantum superposition. A detailed mathematical description of how dephasing and the suppression of dephasing can be reduced to a linear control problem is provided, and used as motivation and context for studies of the filtration properties of various dynamical decoupling sequences. Our work then takes this practical perspective in addressing both "standard" sequences derived from nuclear magnetic resonance and novel optimized sequences developed in the context of quantum information. Additionally, we review new techniques for the numerical construction of optimized pulse sequences using the filter-design perspective. We show how the filter-design perspective permits concise comparisons of the relative capabilities of these sequences and reveals the physics underlying their functionality. The use of this new analytical framework allows us to derive new insights into the performance of these sequences and reveals important limiting issues, such as the effect of digital clocking on optimized sequence performance.

  13. THE PASSIVE SOLAR DESIGN PROCESS FOR A SMALL OFFICE/LABORATORY BUILDING

    E-Print Network [OSTI]

    Andersson, Brandt

    2011-01-01

    More and more passive solar buildings will be built in theroles for passive solar in small commercial buildings, in aPASSIVE SOLAR DESIGN PROCESS FOR A SMALL OFFICE/LABORATORY BUILDING

  14. Application and Design of Residential Building Energy Saving in Cold Climates 

    E-Print Network [OSTI]

    Li, Z.; Li, D.; Mei, S.; Zhang, G.; Liu, J.

    2006-01-01

    Climate is the one of main considerations for residential building design since the green and energy saving building has become the trend in the building industry. China is actively popularizing high energy-effective and environment harmonious...

  15. Energy codes and the building design process: Opportunities for improvement

    SciTech Connect (OSTI)

    Sandahl, L.J.; Shankle, D.L.; Rigler, E.J.

    1994-05-01

    The Energy Policy Act (EPAct), passed by Congress in 1992, requires states to adopt building energy codes for new commercial buildings that meet or exceed the American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) and Illuminating Engineers Society of North America (IES) Standard 90.1-1989 by October 24, 1994. In response to EPAct many states will be adopting a state-wide energy code for the first time. Understanding the role of stakeholders in the building design process is key to the successful implementation of these codes. In 1993, the Pacific Northwest Laboratory (PNL) conducted a survey of architects and designers to determine how much they know about energy codes, to what extent energy-efficiency concerns influence the design process, and how they convey information about energy-efficient designs and products to their clients. Findings of the PNL survey, together with related information from a survey by the American Institute of Architects (AIA) and other reports, are presented in this report. This information may be helpful for state and utility energy program managers and others who will be involved in promoting the adoption and implementation of state energy codes that meet the requirements of EPAct.

  16. Ontario hydro integrated programs for plant design and construction

    SciTech Connect (OSTI)

    Oreskovich, J.P.; Somerville, R.L.

    1987-01-01

    Integrated programs for plant design and construction (IPPDC) is a 5-yr program at Ontario Hydro to optimize engineering and construction productivity through better use of computer technology. The proportion of computer programs operating with data derived from an integrated common data base is very low. IPPDC, on the other hand, is greatly concerned with this common data base. The goals of the IPPDC include improvement of the information flow for a project, minimization of site-discovered interferences, and compression of the entire project life cycle through the intelligent use of computer technology. This program focuses on the development of an integrated data base for plant design software systems to service a multi discipline engineering environment as required by a large-scale megaproject. To achieve the goals of IPPDC, there are three basic elements of computer technology that must be in place before a totally integrated data base system can be achieved: (1) data management; (2) networking; and (3) three-dimensional modeling.

  17. Integrating affordability, energy and environmental efficiency, air quality and disaster resistance into residential design and construction

    SciTech Connect (OSTI)

    Cook, G.D. [Univ. of Florida, Gainesville, FL (United States)

    1995-12-31

    Much has been researched and written about the individual qualities of good home design and construction in terms of: energy efficiency; affordability; indoor air quality; sustainability; and wind, fire, and flood resistance. The real challenge is to integrate all these characteristics into the ideal house. The purpose of this paper is to review the characteristics of each of the above features and explore the integration of them into the ideal residential structure. The house would take the shape of a compact two story structure. A geometrically compact structure uses less construction materials per floor area, presents less area for improved thermal efficiency, and less profile for wind and flood resistance. The first floor would be constructed using insulated strong high thermal mass masonry system resistant to flood, wind, fire, and termite damage. The second story would be constructed using a lighter reinforced wood frame system with between stud insulation coupled with exterior insulated sheathing to minimize thermal bridging across studs. Optimizing floor plan such as separating living and sleeping areas present opportunities for efficient split HVAC zoning, natural ventilation, and solar passive adaptation. The design would emphasize the 4, 8, and 12 foot dimensioning for waste reduction; selection of environmentally friendly building materials, such as cellulose insulation; and efficient lighting and appliances. Features providing improved indoor air quality such as prudent duct selection, design and location, use of radon barriers, omission of carpeting, and control of moisture would be addressed. The design philosophy, concepts and rationale for the integration of these and many other features of the ideal residence will be addressed and illustrated.

  18. Regionalism and the design of low-rise building envelope systems

    E-Print Network [OSTI]

    Tapia, Jason W. (Jason Wilfredo)

    2010-01-01

    This investigation proposes the use of a three-pronged approach to evaluating building envelopes for low-rise affordable housing in urban contexts: construction cost estimating, building performance modeling, and cradle ...

  19. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS ARCHITECTURAL CAMPUS PLANNING PRINCIPLES

    E-Print Network [OSTI]

    Arnold, Jonathan

    UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS ARCHITECTURAL CAMPUS the way" for future projects. #12;UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS ARCHITECTURAL CAMPUS PLANNING PRINCIPLES SEPTEMBER 16, 2013 PAGE

  20. Engineering at SLAC: Designing and Constructing Experimental Devices for SSRL - Oral Presentation

    SciTech Connect (OSTI)

    Djang, Austin

    2015-08-21

    This presentation describes the design and construction of three experimental devices for the Stanford Synchrotron Radiation Lightsource.

  1. ANL/APS/TB-14 APS Beamline Design and Construction Requirements...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    14 APS Beamline Design and Construction Requirements: A Reference Manual for Designers and Builders Version 1.0 May 1994 iii TABLE OF CONTENTS SECTION I DEFINITIONS, GUIDELINES,...

  2. BASICS OF DESIGN AND CONSTRUCTION OF A HUMAN POWERED SUBMARINE 'CharlesR. Lockert

    E-Print Network [OSTI]

    Wood, Stephen L.

    BASICS OF DESIGN AND CONSTRUCTION OF A HUMAN POWERED SUBMARINE 'CharlesR. Lockert Florid used by the author on the design and construction of the human powered submarine "Sea Panther Panther1!and the rational for those decisions. INTRODUCTION The design and construction of a human powered

  3. Design Criteria and Construction of a Capillary Barrier Cover System: The Rocky Mountain Arsenal Experience

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Design Criteria and Construction of a Capillary Barrier Cover System: The Rocky Mountain Arsenal barrier was found to play a critical role. This paper discusses design studies, construction criteria Systems were recently designed and constructed over contaminated materials at the Rocky Mountain Arsenal

  4. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL COMMUNICATIONS REQUIREMENTS

    E-Print Network [OSTI]

    Arnold, Jonathan

    responsible for the following lowvoltage systems: building automation and temperature control systems, access. A Telecommunications Contractor contracted directly with UGA. E. Wiring and cross connect locations within a building

  5. Design and performance relationships for cable distribution in multi-story office buildings 

    E-Print Network [OSTI]

    Ryan, Richard Cecil

    1990-01-01

    Weaknesses associated with cable distribution systems suggest a lack of design consideration in the planning stage of a building. The primary question to be addressed in this study is do relationships between design considerations and building...

  6. Constructal method to optimize solar thermochemical reactor design

    SciTech Connect (OSTI)

    Tescari, S.; Mazet, N.; Neveu, P.

    2010-09-15

    The objective of this study is the geometrical optimization of a thermochemical reactor, which works simultaneously as solar collector and reactor. The heat (concentrated solar radiation) is supplied on a small peripheral surface and has to be dispersed in the entire reactive volume in order to activate the reaction all over the material. A similarity between this study and the point to volume problem analyzed by the constructal approach (Bejan, 2000) is evident. This approach was successfully applied to several domains, for example for the coupled mass and conductive heat transfer (Azoumah et al., 2004). Focusing on solar reactors, this work aims to apply constructal analysis to coupled conductive and radiative heat transfer. As a first step, the chemical reaction is represented by a uniform heat sink inside the material. The objective is to optimize the reactor geometry in order to maximize its efficiency. By using some hypothesis, a simplified solution is found. A parametric study provides the influence of different technical and operating parameters on the maximal efficiency and on the optimal shape. Different reactor designs (filled cylinder, cavity and honeycomb reactors) are compared, in order to determine the most efficient structure according to the operating conditions. Finally, these results are compared with a CFD model in order to validate the assumptions. (author)

  7. Model Reduction for Indoor-Air Behavior in Control Design for Energy-Efficient Buildings

    E-Print Network [OSTI]

    Gugercin, Serkan

    Model Reduction for Indoor-Air Behavior in Control Design for Energy-Efficient Buildings Jeff models for the indoor-air environment in control design for energy efficient buildings. In one method by a desire to incorporate models of the indoor-air environment in the design of energy efficient buildings

  8. Building America Whole-House Solutions for New Homes: Nelson...

    Broader source: Energy.gov (indexed) [DOE]

    Nelson Construction, who worked with the Building America research partner Building Science Corporation to design ten HERS 53 homes with ICF foundations, foam-sheathed above-grade...

  9. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    SciTech Connect (OSTI)

    Kerrigan, Philip

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  10. I-CARES PROFESSOR, ADVANCED BUILDING SYSTEMS & ARCHITECTURAL DESIGN COLLEGE OF ARCHITECTURE AND GRADUATE SCHOOL OF ARCHITECTURE & URBAN DESIGN

    E-Print Network [OSTI]

    Subramanian, Venkat

    at the rank of Associate or Full Professor with a focus on energy- efficient advanced building systems/ or a research record related to energy-efficient architectural design and building technologies, includingI-CARES PROFESSOR, ADVANCED BUILDING SYSTEMS & ARCHITECTURAL DESIGN COLLEGE OF ARCHITECTURE

  11. DESIGN AND CONSTRUCTION OF A FORCE-REFLECTING TELEOPERATION SYSTEM

    SciTech Connect (OSTI)

    M.A. Ebadian, Ph.D.

    1999-01-01

    For certain applications, such as space servicing, undersea operations, and hazardous material handling tasks in nuclear reactors, the environments can be uncertain, complex, and hazardous. Lives may be in danger if humans were to work under these conditions. As a result, a man-machine system--a teleoperator system--has been developed to work in these types of environments. In a typical teleoperator system, the actual system operates at a remote site; the operator located away from this system usually receives visual information from a video image and/or graphical animation on the computer screen. Additional feedback, such as aural and force information, can significantly enhance performance of the system. Force reflection is a type of feedback in which forces experienced by the remote manipulator are fed back to the manual controller. Various control methods have been proposed for implementation on a teleoperator system. In order to examine different control schemes, a one Degree-Of-Freedom (DOF) Force-Reflecting Manual Controller (FRMC) is constructed and integrated into a PC. The system parameters are identified and constructed as a mathematical model. The Proportional-Integral-Derivative (PID) and fuzzy logic controllers are developed and tested experimentally. Numerical simulation results obtained from the mathematical model are compared with those of experimental data for both types of controllers. In addition, the concept of a telesensation system is introduced. A telesensation system is an advanced teleoperator system that attempts to provide the operator with sensory feedback. In this context, a telesensation system integrates the use of a Virtual Reality (VR) unit, FRMC, and Graphical User Interface (GUI). The VR unit is used to provide the operator with a 3-D visual effect. Various commercial VR units are reviewed and features compared for use in a telesensation system. As for the FRMC, the conceptual design of a 3-DOF FRMC is developed in an effort to make the system portable, compact, and lightweight. A variety of design alternatives are presented and evaluated. Finally, a GUI software package is developed to interface with several teleoperation unit components. These components include an industrial robot, electric motor, encoder, force/torque sensor, and CCD camera. The software includes features such as position scaling, force scaling, and rereferencing and is intended to provide a sound basis for the development of a multi-DOF FRMC system in the future.

  12. Solar Design Standards for State Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo.Hydrogen4Energy Smooth BromeBuildingsDesign Standards for State

  13. TEXT ANALYSIS FOR CONSTRUCTING DESIGN REPRESENTATIONS ANDY DONG, ALICE M AGOGINO

    E-Print Network [OSTI]

    Agogino, Alice M.

    designers, manufacturing engineers, process planning engineers, and sales and marketing professionals a considerable amount of effort in accessing and absorbing design information. One can characterize this scenario1 TEXT ANALYSIS FOR CONSTRUCTING DESIGN REPRESENTATIONS ANDY DONG, ALICE M AGOGINO University

  14. Design of a Green Demo Building in a Hot and Humid City in China 

    E-Print Network [OSTI]

    Hammer, W.; Kluz, E.; Sonan, A.; Jiang, Y.; Bacall, A.; Jones, B.

    2006-01-01

    advanced green design practice and technologies to reduce energy consumption and improve comfort, and to achieve sustainable demonstration. CODE INVESTIGATION The design needs to comply with the relevant standards and building regulations in China..., in conjunction with the best design practice in the USA. To recommend building parameters for the building, the local regulations on building envelope were compared with ASHRAE 90.1 (ASHRAE, 2004). ASHRAE 90.1 divided US territories into different climate...

  15. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

    E-Print Network [OSTI]

    Arnold, Jonathan

    ­ Design Professional Design Process Requirements *00 00 08 ­ Design Professional Documentation.14 ­ Seismic Investigations Information UGA Central Campus Probabilistic Seismic Hazard Analysis * 00 73 01

  16. Building Energy Efficient Schools 

    E-Print Network [OSTI]

    McClure, J. D.; Estes, J. M.

    1985-01-01

    Many new school buildings consume only half the energy required by similar efficient structures designed without energy performance as a design criterion. These are comfortable and efficient while construction costs remain about the same as those...

  17. Technology Solutions Case Study: Calculating Design Heating Loads for Superinsulated Buildings

    SciTech Connect (OSTI)

    2015-08-01

    Designing a superinsulated home has many benefits including improved comfort, reduced exterior noise penetration, lower energy bills, and the ability to withstand power and fuel outages under much more comfortable conditions than a typical home. Extremely low heating and cooling loads equate to much smaller HVAC equipment than conventionally required. Sizing the mechanical system to these much lower loads reduces first costs and the size of the distribution system needed. While these homes aren't necessarily constructed with excessive mass in the form of concrete floors and walls, the amount of insulation and the increase in the thickness of the building envelope can lead to a mass effect, resulting in the structures ability to store much more heat than a code built home. This results in a very low thermal inertia making the building much less sensitive to drastic temperature swings thereby decreasing the peak heating load demand. Alternative methods that take this inertia into account along with solar and internal gains result in smaller more appropriate design loads than those calculated using Manual J version 8. During the winter of 2013/2014, the Consortium for Advanced Residential Buildings team monitored the energy use of three homes in climate zone 6 in an attempt to evaluate the accuracy of two different mechanical system sizing methods for low load homes. Based on the results, it is recommended that internal and solar gains be included and some credit for thermal inertia be used in sizing calculations for superinsulated homes.

  18. NIST BUILDING SCIENCE SERIES 181 High-Rise Database-Assisted Design 1.1

    E-Print Network [OSTI]

    NIST BUILDING SCIENCE SERIES 181 High-Rise Database-Assisted Design 1.1 (HR_DAD_1.1): Concepts, University of Florence, Prato, Italy. #12;NIST BUILDING SCIENCE SERIES 181 High-Rise Database-Assisted Design 1.1 (HR_DAD_1.1): Concepts, Software, and Examples Seymour M.J. Spence Building and Fire Research

  19. 8/28/2007 page 1 Designing Steel for Construction Safety1

    E-Print Network [OSTI]

    Toole, T. Michael

    criteria underlying our designs and our daily activities--site safety. Structural engineers and steel8/28/2007 page 1 Designing Steel for Construction Safety1 T. Michael Toole, Nicole Hervol professionals explicitly consider the safety of construction workers during the design phase of projects

  20. Optimization of energy parameters in buildings

    E-Print Network [OSTI]

    Jain, Ruchi V

    2007-01-01

    When designing buildings, energy analysis is typically done after construction has been completed, but making the design decisions while keeping energy efficiency in mind, is one way to make energy-efficient buildings. The ...

  1. The Design and Construction of the MICE Spectrometer Solenoids

    E-Print Network [OSTI]

    Wang, Bert

    2009-01-01

    August 2008. [8] M. A. Green, “A Design of a Rapid DischargeM. A. Green, et al, “The Mechanical and Thermal Design forA. Green, F. Y. Xu, H, Wu, et al, “The Engineering Design of

  2. A system design for a courthouse building in Boston : implementing user needs and requirements

    E-Print Network [OSTI]

    Quiroz, Edgar Alexander

    1992-01-01

    In this thesis, will design a courthouse building located in the Government Center, Boston. This investigation will eventually lead to the development of a preliminary building system. In order to arrive at this level of ...

  3. Analysis of the Design of an HVAC System in a Public Building 

    E-Print Network [OSTI]

    Wei, P.; Shao, Z.; Chen, H.

    2006-01-01

    Based on an example of the design of air conditioning system for a public building, this paper analyzes the characteristics of similar buildings, and introduces the air conditioning system, ventilating system, and the fire control system...

  4. Influence of construction and demolition waste management on the environmental impact of buildings

    SciTech Connect (OSTI)

    Coelho, Andre [Department of Civil Engineering and Architecture, Instituto Superior Tecnico, Universidade Tecnica de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon (Portugal); Brito, Jorge de, E-mail: jbrito@civil.ist.utl.pt [Department of Civil Engineering and Architecture, Instituto Superior Tecnico, Universidade Tecnica de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)

    2012-03-15

    Highlights: Black-Right-Pointing-Pointer Environmental impacts of different demolition practices. Black-Right-Pointing-Pointer 'Top-down' approach to the Life Cycle Analysis methodology. Black-Right-Pointing-Pointer Results based on real buildings measurements and demolition contractor activities. Black-Right-Pointing-Pointer Not every type of selective demolition brings about environmental benefits. - Abstract: The purpose of this study is to quantify comparable environmental impacts within a Life Cycle Analysis (LCA) perspective, for buildings in which the first (Materials) and last (End of Life) life cycle stages are adjusted to several waste/material management options. Unlike most LCAs, the approach is 'top-down' rather than 'bottom-up', which usually involves large amounts of data and the use of specific software applications. This approach is considered appropriate for a limited but expedient LCA designed to compare the environmental impacts of different life cycle options. Present results, based on real buildings measurements and demolition contractor activities, show that shallow, superficial, selective demolition may not result in reduced environmental impacts. Calculations actually show an increase (generally less than 5%) in most impact categories for the Materials and End of Life stages because of extra transportation needs. However, core material separation in demolition operations and its recycling and/or reuse does bring environmental benefits. A reduction of around 77% has been estimated in the climate change impact category, 57% in acidification potential and 81% in the summer smog impact (for the life cycle stages referred).

  5. Analytical Response and Design of Buildings with Metallic Structural Fuses. I

    E-Print Network [OSTI]

    Bruneau, Michel

    and Michel Bruneau2 Abstract: Seismic design relies on inelastic deformations through hysteretic behavior; Seismic design; Seismic effects; Damping; Inelasticity; Ductility. Introduction Typically, in seismicAnalytical Response and Design of Buildings with Metallic Structural Fuses. I Ramiro Vargas1

  6. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL WOOD, PLASTICS, & COMPOSITES REQUIREMENTS

    E-Print Network [OSTI]

    Arnold, Jonathan

    UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL WOOD, PLASTICS, & COMPOSITES REQUIREMENTS JANUARY 16, 2015 06 00 00-1 06 00 00 GENERAL WOOD, PLASTICS, & COMPOSITES

  7. Net Zero Design Yields Positive Results "Net zero" is used to describe a building designed to provide as

    E-Print Network [OSTI]

    Waliser, Duane E.

    . Its two buildings produce enough energy from renewable sources (including a solar panel system features - such as water and energy efficiency, and environmentally friendly materials. Building 2101, designed to be 57% more energy efficient than the typical office building. Two other NASA facilities

  8. Life-Cycle Evaluation of Concrete Building Construction as a Strategy for Sustainable Cities

    E-Print Network [OSTI]

    Stadel, Alexander

    2013-01-01

    Resources. Waste Materials in Construction. Pergamon. ISBN:amounts of solid waste at the construction and end of lifesolid waste and raw material flows during construction and

  9. Construction

    Broader source: Energy.gov [DOE]

    Learn about the energy-efficient construction projects that are saving businesses and communities money while creating jobs.

  10. Operational, aesthetic, and construction process performance for innovative passive and active solar building components for residential buildings

    E-Print Network [OSTI]

    Settlemyre, Kevin (Kevin Franklin), 1971-

    2000-01-01

    A system-based framework creates the ability to integrate operational, aesthetic, and construction process performance. The framework can be used to evaluate innovations within residential construction. By reducing the ...

  11. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS CHANGES FROM SEPTEMEBER 16, 2013 VERSION TO JANUARY 16, 2015 VERSION

    E-Print Network [OSTI]

    Arnold, Jonathan

    UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS CHANGES FROM SEPTEMEBER & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS 8 STANDARDS CHANGES FROM SEPTEMBER 16, 2013 VERSION TO JANUARY will send the file to ESD for review. #12; UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS

  12. Design and construction of a compact multi-chamber tissue equivalent proportional counter 

    E-Print Network [OSTI]

    Taplin, Temeka

    2006-04-12

    This project was designed to determine the feasibility of constructing a multichamber proportional counter. A multi-chamber detector is designed to increase the total surface area which will increase the number of radiation interactions that occur...

  13. BEopt: Software for Identifying Optimal Building Designs on the Path to Zero Net Energy; Preprint

    SciTech Connect (OSTI)

    Christensen, C.; Horowitz, S.; Givler, T.; Courtney, A.; Barker, G.

    2005-04-01

    A zero net energy (ZNE) building produces as much energy on-site as it uses on an annual basis--using a grid-tied, net-metered photovoltaic (PV) system and active solar. The optimal path to ZNE extends from a base case to the ZNE building through a series of energy-saving building designs with minimal energy-related owning and operating costs. BEopt is a computer program designed to find optimal building designs along the path to ZNE. A user selects from among predefined options in various categories to specify options to be considered in the optimization. Energy savings are calculated relative to a reference. The reference can be either a user-defined base-case building or a climate-specific Building America Benchmark building automatically generated by BEopt. The user can also review and modify detailed information on all available options and the Building America Benchmark in a linked options library spreadsheet.

  14. DARTMOUTH COLLEGE DESIGN FEBRUARY 15, 2012 & CONSTRUCTION GUIDELINES

    E-Print Network [OSTI]

    Myers, Lawrence C.

    (BICSI) Standards. National Electrical Manufacturers Assoc. (NEMA) Standards. Electronics Industry Assoc./Telecom. Industry Assoc. (EIA/TIA). Commercial Building Telecom. Wiring Standards (EIA/TIA-568-C). Technical Systems requires written approval and must be documented. Table of Contents 1.Definitions 2.Codes and Standards 3

  15. Project title: Natural ventilation, solar heating and integrated low-energy building design

    E-Print Network [OSTI]

    2009-07-10

    emissions targets. That is why the Cambridge-MIT Institute set up a project to design buildings that consume less energy. The Challenge Their work focuses on the design of energy efficient buildings that use natural ventilation processes, solar... Awards E-stack brings a breath of fresh air to UK schools HOME ABOUT US FUNDING OPPORTUNITIES PROJECTS EDUCATION NEWS EVENTS DOWNLOADS CONTACT US PROJECTS Natural Ventilation Solar Heating and Integrated Low-Energy Building Design SEARCH: Go Page 1...

  16. Low-Infrastructure Hydroelectric Generator To design and build a portable, self

    E-Print Network [OSTI]

    van den Berg, Jur

    !! Low-Infrastructure Hydroelectric Generator To design and build a portable, self contained, hydroelectric generator that functions without the requisite infrastructure of today's more common hydroelectric

  17. Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings

    E-Print Network [OSTI]

    Piette, Mary Ann

    2010-01-01

    response, automation, commercial, industrial buildings, peakautomation system design. Auto-DR for commercial and industrialautomation server renamed as the DRAS. This server was operated at a secure industrial

  18. Sustainable Energy Resources for Consumers Webinar on Building Design & Passive Solar Transcript

    Broader source: Energy.gov [DOE]

    Video recording transcript of a Webinar on Nov. 16, 2010 about residential passive solar building design and solar thermal heating applications

  19. Transaction-Cost Economic Analysis of Institutional Change toward Design-Build Contracts for Public Transportation

    E-Print Network [OSTI]

    Whittington, Jan; Dowall, David E.

    2006-01-01

    private initiative to build Tacoma Narrows Bridge. Public–Bechtel and Kiewit on Tacoma Narrows), and promote, throughSince Thurston Way and Tacoma Narrows, two other design

  20. 382 IEEE JOURNAL OF PHOTOVOLTAICS, VOL. 2, NO. 3, JULY 2012 Design and Construction of

    E-Print Network [OSTI]

    Rollins, Andrew M.

    regarding system performance, reliability, and cost. Index Terms--Compound parabolic concentrators (CPCs382 IEEE JOURNAL OF PHOTOVOLTAICS, VOL. 2, NO. 3, JULY 2012 Design and Construction of a 7× Low Abstract--We report on the design, construction, and initial performance measurements of a low

  1. 1 Imbedded Heat Pipe Prototype Modelling, Design, and Construction for Particle Ac-

    E-Print Network [OSTI]

    Cinabro, David

    1 Imbedded Heat Pipe Prototype Modelling, Design, and Construction for Particle Ac- celerator for predicting heat pipe performance has been generated and a design based on the results of that model has been implemented. A prototype heat pipe is under construction to test the validity of the model. The prototype

  2. Alliance Lean Design/Construct on a Small High Tech Project Proceedings IGLC `98

    E-Print Network [OSTI]

    Tommelein, Iris D.

    Alliance Lean Design/Construct on a Small High Tech Project Proceedings IGLC `98 ALLIANCE LEAN practitioner firms. It will grow even more dramatically through the formation of informal and formal alliances3 joined in an informal alliance and tested their conviction that Lean Design and Construction can

  3. A Study on Design Parameters of Stirling Engines for Buildings 

    E-Print Network [OSTI]

    Ding, G.; Huang, S.; Zhang, C.; Hu, X.; Zhang, X.

    2006-01-01

    One of the most promising projects in the application of combined heat and power(CHP) lies in energy production for buildings. Stirling engines are very applicable to residential buildings, especially because of the higher electricity...

  4. City of Phoenix- Design Standards for City Buildings

    Broader source: Energy.gov [DOE]

    The City of Phoenix has had energy standards for public buildings in place since 2005. In June 2005, the Phoenix City Council adopted a policy requiring all new city buildings built with 2006 bond...

  5. Proposal to Increase the Amount of the Contract for the Civil Engineering Work for the Construction and Extension of Buildings on the Prévessin Site

    E-Print Network [OSTI]

    1979-01-01

    Proposal to Increase the Amount of the Contract for the Civil Engineering Work for the Construction and Extension of Buildings on the Prévessin Site

  6. Adjudication of a Contract for the Construction of a Building for the Electricity Sub-Station of the 300 GeV Accelerator

    E-Print Network [OSTI]

    1973-01-01

    Adjudication of a Contract for the Construction of a Building for the Electricity Sub-Station of the 300 GeV Accelerator

  7. Department of Energy Commercial Building Benchmarks (New Construction): Summary of Changes from v1.1_3.1 to v1.2_4.0, October 30, 2009

    Broader source: Energy.gov [DOE]

    This file contains the changes to the new construction building benchmark files from version 1.0_3.0 to version 1.1_3.1.

  8. Proposal for the award of a contract for the construction work for the new Building 771 "Polymer Laboratory" on the Prévessin site

    E-Print Network [OSTI]

    2015-01-01

    Proposal for the award of a contract for the construction work for the new Building 771 "Polymer Laboratory" on the Prévessin site

  9. Report on High Performance Building's Energy Modeling, Physical Building Information Modeling for Solar Building Design and Simulation 

    E-Print Network [OSTI]

    Alcocer, J.; Haberl, J. S.

    2012-01-01

    This report was created for the National Science Foundation-Physical Building Information Modeling (NSF-PBIM) project. This report describes the analysis of a solar office building using the following software: the legacy ...

  10. Assessment of the thermal efficiency, structure and fire resistance of lightweight building systems for optimized design 

    E-Print Network [OSTI]

    Amundarain, Aitor

    The use of lightweight building systems is very controversial as existing knowledge about their performance is limited. Not enough research has been conducted to determine the suitability of these modern construction ...

  11. Design and analysis of a concrete modular housing system constructed with 3D panels

    E-Print Network [OSTI]

    Sarcia, Sam Rhea, 1982-

    2004-01-01

    An innovative modular house system design utilizing an alternative concrete residential building system called 3D panels is presented along with an overview of 3D panels as well as relevant methods and markets. The proposed ...

  12. Design-Build Process for the Research Support Facility (RSF) (Book)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01

    An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.

  13. NIST BUILDING SCIENCE SERIES 180 Database-Assisted Design for Wind

    E-Print Network [OSTI]

    NIST BUILDING SCIENCE SERIES 180 Database-Assisted Design for Wind: Concepts, Software, and Examples for Rigid and Flexible Buildings Joseph A. Main and William P. Fritz #12;Cover Photo: Boundary Layer Wind Tunnel Laboratory, The University of Western Ontario #12;NIST BUILDING SCIENCE SERIES 180

  14. Physical Building Information Modeling for Solar Building Design and Simulation- Annual Report 2011 

    E-Print Network [OSTI]

    Yan, W.; Haberl, J.; Clayton, M.; Jeong, W.; Kim, J.; Kota, S.; Alcocer, J.; Dixit, M.

    2011-01-01

    This report was created for the National Science Foundation-Physical Building Information Modeling (NSF-PBIM) project. This report describes the analysis of a solar office building using the following software: the legacy ...

  15. A design methodology for hysteretic dampers in buildings under extreme earthquakes

    E-Print Network [OSTI]

    Fleming, Cody Harrison

    2004-01-01

    This research proposes a design methodology for hysteretic dampers in buildings under high levels of seismic hazard. Developments in structural materials have led to designs that satisfy strength requirements but are often ...

  16. Improvements to building energy usage modeling during early design stages and retrofits

    E-Print Network [OSTI]

    Mandelbaum, Andrew (Andrew Joseph)

    2014-01-01

    A variety of improvements to the MIT Design Advisor, a whole-building energy usage modeling tool intended for use during early design stages, are investigated. These include changes to the thermal mass temperature distribution ...

  17. Design of a building structural skin using multi-objective optimization techniques

    E-Print Network [OSTI]

    Merello, Riccardo

    2006-01-01

    Multi-disciplinary System Design Optimization was used to design the geometry and to select the materials for the structural facade of a building. A multi-objective optimization model was developed, capable of optimizing ...

  18. Acoustical and Noise Control Criteria and Guidelines for Building Design and Operations 

    E-Print Network [OSTI]

    Evans, J. B.; Himmel, C. N.

    2009-01-01

    , which affects building occupants, sensitive installations, and functional uses. Various noise and vibration design criteria, field measurements, design concepts and specifications can be applied in facilities to achieve noise mitigation and vibration...

  19. Design of structurally-sound masonry buildings using 3D static analysis

    E-Print Network [OSTI]

    Whiting, Emily Jing Wei

    2012-01-01

    In the design of buildings, structural analysis is traditionally performed after the aesthetic design has been determined and has little in uence on the overall form. This thesis presents methods to integrate architectural ...

  20. Building America Whole-House Solutions for New Homes: HVAC Design...

    Energy Savers [EERE]

    HVAC Design Strategy for a Hot-Humid Production Builder Building America Whole-House Solutions for New Homes: HVAC Design Strategy for a Hot-Humid Production Builder In this...

  1. Chemical Fume Hood Guide Design, Construction, Health Table of Contents

    E-Print Network [OSTI]

    Walker, Lawrence R.

    & Dismantling........................................................................9 · Fume Hood Evaluation In The Field · Procedures Prior to Servicing or Dismantling · Fume Hood Service Procedure V. References guidelines for the design, installation, renovation, maintenance, and dismantling of chemical fume hoods

  2. Design, construction and analysis of an LED strobe controller

    E-Print Network [OSTI]

    Villalva, Nicholas E

    2012-01-01

    In this thesis, I describe an LED strobe controller that I designed and built. With the advent of much brighter LEDs, it is possible to create stroboscopes with both high intensity output and high maximum flash rates. ...

  3. Effective Daylighting: Evaluating Daylighting Performance in the San Francisco Federal Building from the Perspective of Building Occupants

    E-Print Network [OSTI]

    Konis, Kyle Stas

    2012-01-01

    Building Council (2009). LEED 2009 for New Construction andBuilding Council. (2006). LEED-NC (Leadership in Energy andDesign) Version 2.2. www.usgbc.org/LEED/ U.S. Green Building

  4. Effective Daylighting: Evaluating Daylighting Performance in the San Francisco Federal Building from the Perspective of Building Occupants

    E-Print Network [OSTI]

    Konis, Kyle Stas

    2011-01-01

    Building Council (2009). LEED 2009 for New Construction andBuilding Council. (2006). LEED-NC (Leadership in Energy andDesign) Version 2.2. www.usgbc.org/LEED/ U.S. Green Building

  5. Role of Modeling When Designing for Absolute Energy Use Intensity Requirements in a Design-Build Framework: Preprint

    SciTech Connect (OSTI)

    Hirsch, A.; Pless, S.; Guglielmetti, R.; Torcellini, P. A.; Okada, D.; Antia, P.

    2011-03-01

    The Research Support Facility was designed to use half the energy of an equivalent minimally code-compliant building, and to produce as much renewable energy as it consumes on an annual basis. These energy goals and their substantiation through simulation were explicitly included in the project's fixed firm price design-build contract. The energy model had to be continuously updated during the design process and to match the final building as-built to the greatest degree possible. Computer modeling played a key role throughout the design process and in verifying that the contractual energy goals would be met within the specified budget. The main tool was a whole building energy simulation program. Other models were used to provide more detail or to complement the whole building simulation tool. Results from these specialized models were fed back into the main whole building simulation tool to provide the most accurate possible inputs for annual simulations. This paper will detail the models used in the design process and how they informed important program and design decisions on the path from preliminary design to the completed building.

  6. Building

    E-Print Network [OSTI]

    Physical Facilities

    2013-11-12

    MATHEMATICAL SCIENCES BUILDING. BUILDING EMERGENCY PLAN. Date Adopted: Sept 20, 2013. Date Revised: Sep 20. 2013. Prepared By: Kelly ...

  7. Technical Support Document: 50% Energy Savings Design Technology Packages for Highway Lodging Buildings

    SciTech Connect (OSTI)

    Jiang, Wei; Gowri, Krishnan; Lane, Michael D.; Thornton, Brian A.; Rosenberg, Michael I.; Liu, Bing

    2009-09-28

    This Technical Support Document (TSD) describes the process, methodology and assumptions for development of the 50% Energy Savings Design Technology Packages for Highway Lodging Buildings, a design guidance document intended to provide recommendations for achieving 50% energy savings in highway lodging properties over the energy-efficiency levels contained in ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings.

  8. Technical Support Document: 50% Energy Savings Design Technology Packages for Medium Office Buildings

    SciTech Connect (OSTI)

    Thornton, Brian A.; Wang, Weimin; Lane, Michael D.; Rosenberg, Michael I.; Liu, Bing

    2009-09-01

    This Technical Support Document (TSD) describes the process and methodology for development of the Advanced Energy Design Guide for Medium Offices (AEDG-MO or the Guide), a design guidance document which intends to provide recommendations for achieving 50% energy savings in medium office buildings that just meet the requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings.

  9. Evaluating the Design of an Audit Data Pseudonymizer Using Basic Building Blocks for Anonymity

    E-Print Network [OSTI]

    Flegel, Ulrich

    Evaluating the Design of an Audit Data Pseudonymizer Using Basic Building Blocks for Anonymity an audit data pseudonymization system as an example, we show how the APES approach for basic anonymity building blocks can be used to informally evaluate the design of a given anonymity system. As a by

  10. Designs for the manufacture of manipulable plastic DNA/RNA building blocks for learning life science

    E-Print Network [OSTI]

    Lemanski, Bethany I

    2013-01-01

    The subject of this thesis is the design of custom injection-molded manipulable DNA building blocks for use in a hands-on life sciences educational kit. The new design of the DNA building blocks is meant to replace the ...

  11. Integrated Building Energy Systems Design Considering Storage Technologies

    E-Print Network [OSTI]

    Stadler, Michael

    2009-01-01

    N. et al. , (2007), “Microgrids, An Overview of Ongoingand Operation of Microgrids in Commercial Buildings”, IEEEsuccessful deployment of microgrids will depend heavily on

  12. Building and Home Design Products and Services | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    and developers that build ENERGY STAR qualified new homes; lenders that offer energy efficient mortgages; utilities that offer special incentives to buyers, builders and...

  13. Framework for Advance Sustainable Building Design. Smart Micro-Grid Enabled Buildings and Utility-Side of the Meter Energy Markets

    E-Print Network [OSTI]

    Goldberg, Bennett

    Framework for Advance Sustainable Building Design. Smart Micro-Grid Enabled Buildings and Utility ·BUILDING ENERGY MODEL · HUMAN IN THE LOOP (Societal Nets) · GFAS ·POWER ELECTRONICS · STORAGE ·RESPONSE and Operation of Smart Micro-Grid-Enabled Buildings and Prototype Two-Layer Implementation. Framework Objectives

  14. Click to edit Master title style ENGINEERING, ARCHITECTURE, CONSTRUCTION,

    E-Print Network [OSTI]

    Subramanian, Venkat

    Click to edit Master title style ENGINEERING, ARCHITECTURE, CONSTRUCTION, ENVIRONMENTAL & Federal · Business & Technology Services · Construction/Design ­ Build · Energy · Environmental · Global · Combustion Improvement Programs · High Voltage Design · Substations and Transmission Lines · Controls Systems

  15. Why Do Building Owners Invest in Bicycle-Oriented Design?

    E-Print Network [OSTI]

    Orrick, Phyllis; Trapenberg Frick , Karen; Ragland, Davi

    2011-01-01

    available sources for BOD design elements. RECOMMENDATION Weand best practices of BOD design elements would be useful toelements comprise what we are calling “bicycle-oriented design” (

  16. Seismic design, testing and analysis of reinforced concrete wall buildings

    E-Print Network [OSTI]

    Panagiotou, Marios

    2008-01-01

    combined elements of structural design, testing andcontrol and design of structural and nonstructural response.for Seismic Design of Structural Walls. ACI Structural

  17. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL MECHANICAL REQUIREMENTS (HVAC)

    E-Print Network [OSTI]

    Arnold, Jonathan

    UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS GENERAL MECHANICAL REQUIREMENTS (HVAC) JANUARY 16, 2015 23 00 001 23 00 00 GENERAL MECHANICAL REQUIREMENTS (HVAC) 1. GENERAL A. Related sections: i. 00 00 07 ­ Design Professional Design Process Requirements ii. 00 00

  18. Simulation as a Tool to Develop Guidelines of Envelope Design of a Typical Office Building in Egypt 

    E-Print Network [OSTI]

    Samaan, M.M.; Ahmed, A.N.; Farag, O.M.A.; El-Sayed Khalil, M.

    2011-01-01

    This paper describes the use of building performance simulation software in order to develop guidelines for designing energy-efficient office building. In Egypt energy codes for all building types are being under development. On the other hand...

  19. Design and construction of a magnetic force microscope 

    E-Print Network [OSTI]

    Khandekar, Sameer Sudhakar

    2005-08-29

    compared to the previous designs. Some of the anticipated system specifications are: 1) room temperature scanning range of 175?? 175 ??m, 2) low temperature scanning range between 35-50 ??m, 3) smallest detectable magnetic force in the range of one pN and 4...

  20. Measuring-up in timber: A critical perspective on mid- and high-rise timber building design

    E-Print Network [OSTI]

    Fleming, Patrick; Smith, Simon; Ramage, Michael

    2014-07-07

    timber elements in high-rise buildings is still in its infancy. This paper offers a new perspective on building with wood at this scale, beyond carbon sequestration and construction. Criticism of existing projects and proposals, including the authors’ own...

  1. Synergy Between Building Rating Systems and Design Methodology for Intelligent and Green Buildings 

    E-Print Network [OSTI]

    Zeiler, W.; Boxem, G.

    2008-01-01

    There is a strong need for more efficient and more sustainable buildings. At present it is difficult to define the performance of buildings in an objective way to efficiency and sustainability. Goal of this project is to examine and to understand...

  2. Applying engineering principles to the design and construction of transcriptional devices

    E-Print Network [OSTI]

    Shetty, Reshma P

    2008-05-27

    The aim of this thesis is to consider how fundamental engineering principles might best be applied to the design and construction of engineered biological systems. I begin by applying these principles to a key application ...

  3. Applying engineering principles to the design and construction of transcriptional devices

    E-Print Network [OSTI]

    Shetty, Reshma P. (Reshma Padmini)

    2008-01-01

    The aim of this thesis is to consider how fundamental engineering principles might best be applied to the design and construction of engineered biological systems. I begin by applying these principles to a key application ...

  4. The design and construction of interactive architectural environments : the digital mile, Zaragoza, Spain

    E-Print Network [OSTI]

    Chai, Shutsu K. (Shutsu Kindness)

    2006-01-01

    As a part of a master plan for the Digital Mile, a park in Zaragoza, Spain, this thesis will undertake the mechanical design and construction of a responsive and rearrangeable system of walls and doors for increasing the ...

  5. Design and construction of rigs for studying surface condensation and creating anodized metal oxide surfaces

    E-Print Network [OSTI]

    Sun, Wei-Yang

    2011-01-01

    This thesis details the design and construction of a rig for studying surface condensation and a rig for creating anodized metal oxides (AMOs). The condensation rig characterizes condensation for different surfaces; this ...

  6. Towards a post-industrial architecture : design and construction of houses for the information age

    E-Print Network [OSTI]

    Demchak, Gregory L. (Gregory Leonard), 1974-

    2000-01-01

    The design and construction of modern residential architecture, which came into critical focus by architects of the Machine Age, continues to be a priority in the architectural discourse. For Modern architects, the desire ...

  7. Design, construction and evaluation of a facility for the simulation of fast reactor blankets

    E-Print Network [OSTI]

    Forbes, Ian Alexander

    1970-01-01

    A facility has been designed and constructed at the MIT Reactor for the experimental investigation of typical LMFBR breeding blankets. A large converter assembly, consisting of a 20-cm-thick layer of graphite followed by ...

  8. Robotic design construction : digital fabrication strategies for freeform masonry casting and mobile assembly

    E-Print Network [OSTI]

    Liu, Yuchen, S.M. Massachusetts Institute of Technology

    2009-01-01

    The paradigm shift of digital fabrication encourages architects to incorporate the knowledge of using innovative materials and novel tools to solve problems in design and construction. However, the application of digital ...

  9. High-Turnaround and Flexibility in Design and Construction of Mass Housing Proceedings IGLC-7 181

    E-Print Network [OSTI]

    Tommelein, Iris D.

    ), flexible manufacturing systems (FMS), and lean manufacturing coupled with innovative ideas can hope and objectives of flexible and lean construction. OBJECTIVES The objectives are simply to design manufacturing erection of apartment housing units that have architectural flexibility, manufacturing flexibility

  10. Design and construction of a cyclotron capable of accelerating protons to 2 MeV

    E-Print Network [OSTI]

    Dewan, Leslie

    2007-01-01

    This thesis describes the design and construction of a cyclotron capable of accelerating protons to 2 MeV. A cyclotron is a charged particle accelerator that uses a magnetic field to confine particles to a spiral flight ...

  11. Development of a research methodology to study lumber waste due to design causes in residential construction 

    E-Print Network [OSTI]

    Vyas, Ashok Madhusudan

    1999-01-01

    Residential Construction faces problems regarding inefficiencies of material usage. Builders pay twice for the lumber that is wasted. Once when it is purchased and once when it is disposed. Part of the lumber waste is generated due to the design...

  12. Siphon penstock installations at hydroelectric projects: A survey of design, construction and operating experience

    SciTech Connect (OSTI)

    Burgoine, D.; Rodrigue, P.; Tarbell, J.C. (Acres International Corp., Amherst, NY (USA); Acres International Corp., Amherst, NY (USA). Mechanical Engineering Dept.; Acres International Corp., Amherst, NY (USA))

    1989-01-01

    There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock installations. The design considerations, construction and operating aspects of siphon penstock installations are described here. 4 figs., 1 tab.

  13. Design Rationale for Construction and Monitoring of Unsaturated Soil Covers at the Rocky Mountain Arsenal

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Design Rationale for Construction and Monitoring of Unsaturated Soil Covers at the Rocky Mountain, a high-profile hazardous waste facility located near Denver, Colorado, USA. The soil cover system has presented by the interdependent criteria, and the post-construction monitoring program. INTRODUCTION The use

  14. The relationship between engineering design and construction costs of aquaculture ponds 

    E-Print Network [OSTI]

    Yates, Michael Edward

    1988-01-01

    THE RELATIONSHIP BETWEEN ENGINEERING DESIGN AND CONSTRUCTION COSTS OF AQUACULTURE PONDS A Thesis by MICHAEL EDWARD YATES Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements of the degree... of MASTER OF SCIENCE May 1988 Major Subject: Agricultural Economics THE RELATIONSHIP BETWEEN ENGINEERING DESIGN AND CONSTRUCTION COSTS OF AQUACULTURE PONDS A Thesis by MICHAEL EDWARD YATES Approved as to style and content by: Wade L. Grif (Chair...

  15. An object-oriented construction kit architecture for designing man/machine interfaces 

    E-Print Network [OSTI]

    DeSoi, John Francis

    1988-01-01

    AN OBJECT-ORIENTED CONSTRUCTION KIT ARCHITECTURE FOR DESIGNING MAN/MACHINE INTERFACES A Thesis by JOHN FRANCIS DESOI Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE December 1988 Major Subject: Computer Science AN OBJECT-ORIENTED CONSTRUCTION KIT ARCHITECTURE FOR DESIGNING MAN/MACHINE INTERFACES A Thesis by JOHN FRANCIS DESOI Approved as to style and content by: William Lively j (Chair...

  16. Building America Webinar: High Performance Enclosure Strategies: Part II, New Construction- August 13, 2014- Introduction

    Broader source: Energy.gov [DOE]

    This presentation is the Introduction to the Building America webinar, High Performance Enclosure Strategies, Part II, held on August 13, 2014.

  17. Summary - Building C-400 Thermal Treatment Remedial Design Report...

    Office of Environmental Management (EM)

    Paducah, KY EM Project: Building C400 Thermal Treatment ETR Report Date: August 2007 ETR-8 United States Department of Energy Office of Environmental Management (DOE-EM) External...

  18. Integrating Acclimated Kinetic Envelopes into Sustainable Building Design 

    E-Print Network [OSTI]

    Wang, Jialiang

    2014-05-28

    affects the energy usage of a building. In an effort to simultaneously consider and satisfy all of the various indoor comfort requirements, changing climatic conditions can generate conflicting conditions. Acclimated Kinetic Envelope (AKE) is a notion...

  19. OpenStudio: Building Design Expertise at Your Fingertips

    Broader source: Energy.gov [DOE]

    The newest version of the OpenStudio Application Suite and Development Platform developed by the National Renewable Energy Laboratory helps architects and engineers model whole-building energy use.

  20. Public Meeting Transcript: Sustainable Design Standards for Federal Buildings

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget || Department ofDepartment ofNuclearBuildings

  1. Effective Design Strategies

    Broader source: Energy.gov [DOE]

    As described in the Whole Building Design Guide (WBDG), all Federal agencies are required to follow the Guiding Principles for New Construction and Major Renovations, which include considerations...

  2. The Design and Construction of the MICE Spectrometer Solenoids

    SciTech Connect (OSTI)

    Wang, Bert; Wahrer, Bob; Taylor, Clyde; Xu, L.; Chen, J. Y.; Wang, M.; Juang, Tiki; Zisman, Michael S.; Virostek, Steve P.; Green, Michael A.

    2008-08-02

    The purpose of the MICE spectrometer solenoid is to provide a uniform field for a scintillating fiber tracker. The uniform field is produced by a long center coil and two short end coils. Together, they produce 4T field with a uniformity of better than 1% over a detector region of 1000 mm long and 300 mm in diameter. Throughout most of the detector region, the field uniformity is better than 0.3%. In addition to the uniform field coils, we have two match coils. These two coils can be independently adjusted to match uniform field region to the focusing coil field. The coil package length is 2544 mm. We present the spectrometer solenoid cold mass design, the powering and quench protection circuits, and the cryogenic cooling system based on using three cryocoolers with re-condensers.

  3. THE UNIVERSITY OF TEXAS AT AUSTIN ELECTRONIC SECURITY SYSTEM DESIGN, CONSTRUCTION AND COMMISSIONING GUIDE

    E-Print Network [OSTI]

    Pillow, Jonathan

    the work. 1.2 PURPOSE A. Establish design criteria, define activities, identify stakeholders and assignTHE UNIVERSITY OF TEXAS AT AUSTIN ELECTRONIC SECURITY SYSTEM DESIGN, CONSTRUCTION AND COMMISSIONING Installation & Repair shop. 1.3 OVERVIEW A. The electronic safety and security systems for UT Austin

  4. The Framework of an Optimization Model for the Thermal Design of Building Envelopes 

    E-Print Network [OSTI]

    Al-Homoud, M. S.; Degelman, L. O.; Boyer, L. L.

    1994-01-01

    to the decision making process of building design. In dealing with the building as a thermal system, the proper selection of its components and their relationships can be organized using a systems approach. This can be achieved by coupling an optimization...

  5. ComEd- Smart Ideas for Business New Construction

    Broader source: Energy.gov [DOE]

    Commonwealth Edison's (ComEd) New Construction Service program element, in coordination with Nicor Gas, provides cash incentives and technical assistance to encourage building owners, designers and...

  6. Vectren Energy Delivery of Indiana (Electric)- Commercial New Construction Rebates

    Broader source: Energy.gov [DOE]

    Vectren Energy Delivery offers commercial customers in Indiana electric rebates for the installation of certain types of equipment in newly constructed buildings through its Energy Design Assist...

  7. Building a library of eligibility criteria to support design of clinical trials

    E-Print Network [OSTI]

    van Harmelen, Frank

    Building a library of eligibility criteria to support design of clinical trials Krystyna Milian1 the design of eligibility criteria, enable the reuse of well-structured criteria and to provide meaningful, Eligibility criteria, Formalization of eligibility criteria, Sup- porting design of eligibility criteria 1

  8. Structure-Based Ligand Design by a Build-Up Approach and Genetic Algorithm

    E-Print Network [OSTI]

    Caflisch, Amedeo

    Structure-Based Ligand Design by a Build-Up Approach and Genetic Algorithm Search in Conformational: 1956­1970, 2001 Keywords: ligand docking; structure-based design; genetic algorithm; implicit solvation; peptidomimetics Introduction Computer-aided structure-based ligand design is a multidisciplinary and challenging

  9. Wisdom Way Solar Village: Design, Construction, and Analysis of a Low Energy Community

    SciTech Connect (OSTI)

    Aldrich, Robb

    2012-08-01

    This report describes work conducted at the Wisdom Way Solar Village (WWSV), a community of 10 high performance duplexes (20 homes) in Greenfield, MA, constructed by Rural Development, Inc. (RDI). Building America's CARB team monitored temperatures and comfort in several homes during the winter of 2009-2010, and tracked utility bill information from 13 occupied homes. Because of efficient lights, appliances, and conscientious home occupants, the energy generated by the solar electric systems exceeded the electric energy used in most homes.

  10. Enumerating a Diverse Set of Building Designs Using Discrete Optimization: Preprint

    SciTech Connect (OSTI)

    Hale, E.; Long, N.

    2010-08-01

    Numerical optimization is a powerful method for identifying energy-efficient building designs. Automating the search process facilitates the evaluation of many more options than is possible with one-off parametric simulation runs. However, input data uncertainties and qualitative aspects of building design work against standard optimization formulations that return a single, so-called optimal design. This paper presents a method for harnessing a discrete optimization algorithm to obtain significantly different, economically viable building designs that satisfy an energy efficiency goal. The method is demonstrated using NREL's first-generation building analysis platform, Opt- E-Plus, and two example problems. We discuss the information content of the results, and the computational effort required by the algorithm.

  11. A multiuse building for Vaasa, Finland : a design through change for continuity

    E-Print Network [OSTI]

    Harjunpaa, Arto

    1986-01-01

    This design thesis presents an alternative way of introducing a new building into an existing urban setting. The visibility of change through time is one of a city's most valuable assets. However, the sense of continuity ...

  12. HBDR: a case-based tool for organizing architectural information on historic building designs 

    E-Print Network [OSTI]

    Mulye, Leena

    2002-01-01

    use for the student community. Case-based representation and learning systems can be used to arrange and define the case study information. In this research, I have collected and categorized information about previous historic building designs. As a...

  13. Opportunities and Threats of Green Building Design for ABC Engineers, Kansas City

    E-Print Network [OSTI]

    Wikoff, Brandon D.

    2008-12-19

    estate expert, Charles Lockwood. (Yudelson 2008, 27). The ‘Green’ building revolution has presented a unique opportunity for Consulting Engineering firms specializing in mechanical, electrical, and plumbing (MEP) design, such as ABC Engineers, to capture...

  14. A systems approach to conceptual design solutions for a very tall building in Hong Kong

    E-Print Network [OSTI]

    Ungerer, Frank Wolfgang, 1969-

    1998-01-01

    The thesis represents a design investigation that seeks to reconsider the high-rise building. With changing uses and technologies, high-rise office towers may have become obsolete. Given the recent capabilities for ...

  15. Building robust chemical reaction mechanisms : next generation of automatic model construction software

    E-Print Network [OSTI]

    Song, Jing, 1972-

    2004-01-01

    Building proper reaction mechanisms is crucial to model the system dynamic properties for many industrial processes with complex chemical reaction phenomena. Because of the complexity of a reaction mechanism, computer-aided ...

  16. Investigation of the Accuracy of Calculation Methods for Conduction Transfer Functions of Building Construction 

    E-Print Network [OSTI]

    Chen, Y.; Li, X.; Zhang, Q.; Spitler, J.; Fisher, D.

    2006-01-01

    Conduction transfer functions (CTFs) are widely used to calculate conduction heat transfer in building cooling load and energy calculations. They can conveniently fit into any load and energy calculation techniques to perform conduction calculations...

  17. TTUS FP&C Design & Building Standards Division 14 Conveyance

    E-Print Network [OSTI]

    Gelfond, Michael

    but not limited to the following: 1. ASME A17.1 Safety Code for Elevators and Escalators and ASME A17 Lockshop. Comply with applicable building codes and elevator codes at the project site, including.2.1 Inspectors Manual, current adopted edition. 2. NFPA 70 National Electrical Code, current

  18. Designing in context : a new building for Boston's Beacon Hill

    E-Print Network [OSTI]

    Harris, Donna L

    1982-01-01

    The importance of contextually sensitive design is once again becoming recognized by the architectural profession. A contextual design is based upon an understanding of historical and social factors as well as the physical ...

  19. Seismic design, testing and analysis of reinforced concrete wall buildings

    E-Print Network [OSTI]

    Panagiotou, Marios

    2008-01-01

    ACI-318, Eurocode 8, which has similar provisions to the New Zealand 3101 concrete design standard,ACI-318, Eurocode 8, which has similar provisions to the New Zealand 3101 Concrete Design Standard

  20. Toward an Effective Design Process: Enhancing Building Performance through Better Integration of Facility Management Perspectives in the Design Process 

    E-Print Network [OSTI]

    Kalantari Hematabadi, Seyed Saleh

    2014-08-20

    In today’s architecture and construction industry, there is a growing agreement that the input of facility management professionals (FMs) can be a vital resource during the architectural design process. FMs are responsible for the everyday operation...

  1. Using an Energy Performance Based Design-Build Process to Procure a Large Scale Low-Energy Building: Preprint

    SciTech Connect (OSTI)

    Pless, S.; Torcellini, P.; Shelton, D.

    2011-05-01

    This paper will review a procurement, acquisition, and contract process of a large-scale replicable net zero energy (ZEB) office building. The owners developed and implemented an energy performance based design-build process to procure a 220,000 ft2 office building with contractual requirements to meet demand side energy and LEED goals. We will outline the key procurement steps needed to ensure achievement of our energy efficiency and ZEB goals. The development of a clear and comprehensive Request for Proposals (RFP) that includes specific and measurable energy use intensity goals is critical to ensure energy goals are met in a cost effective manner. The RFP includes a contractual requirement to meet an absolute demand side energy use requirement of 25 kBtu/ft2, with specific calculation methods on what loads are included, how to normalize the energy goal based on increased space efficiency and data center allocation, specific plug loads and schedules, and calculation details on how to account for energy used from the campus hot and chilled water supply. Additional advantages of integrating energy requirements into this procurement process include leveraging the voluntary incentive program, which is a financial incentive based on how well the owner feels the design-build team is meeting the RFP goals.

  2. User innovation in digital design and construction : dialectical relations between standard BIM tools and specific user requirements

    E-Print Network [OSTI]

    Soto Ogueta, Carolina M

    2012-01-01

    The use of Building Information Modeling (BIM) tools is increasing across the Architectural, Engineering and Construction (AEC) industry. This technology is being adopted in many different countries, in a wide range of ...

  3. Building America Case Study: Calculating Design Heating Loads for Superinsulated Buildings, Ithaca, New York; Technology Solutions for New and Existing Homes, Energy Efficiency & Renewable Energy (EERE)

    SciTech Connect (OSTI)

    2015-08-01

    Designing a superinsulated home has many benefits including improved comfort, reduced exterior noise penetration, lower energy bills, and the ability to withstand power and fuel outages under much more comfortable conditions than a typical home. Extremely low heating and cooling loads equate to much smaller HVAC equipment than conventionally required. Sizing the mechanical system to these much lower loads reduces first costs and the size of the distribution system needed. While these homes aren't necessarily constructed with excessive mass in the form of concrete floors and walls, the amount of insulation and the increase in the thickness of the building envelope can lead to a mass effect, resulting in the structures ability to store much more heat than a code built home. This results in a very low thermal inertia making the building much less sensitive to drastic temperature swings thereby decreasing the peak heating load demand. Alternative methods that take this inertia into account along with solar and internal gains result in smaller more appropriate design loads than those calculated using Manual J version 8. During the winter of 2013/2014, CARB monitored the energy use of three homes in climate zone 6 in an attempt to evaluate the accuracy of two different mechanical system sizing methods for low load homes. Based on the results, it is recommended that internal and solar gains be included and some credit for thermal inertia be used in sizing calculations for superinsulated homes.

  4. Design and Construction Solutions in the Accurate Realization of NCSX Magnetic Fields

    SciTech Connect (OSTI)

    Heitzenroeder, P.; Dudek, Lawrence E.; Brooks, Arthur W.; Viola, Michael E.; Brown, Thomas; Neilson, George H.; Zarnstorff, Michael C.; Rej, Donald; Cole,Michael J.; Freudenberg, Kevin D.; Harris J. H.; McGinnis, Gary

    2008-09-29

    The National Compact Stellarator Experiment, NCSX, is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge national Laboratory. The goal of NCSX is to provide the understanding necessary to develop an attractive, disruption free, steady state compact stellaratorbased reactor design. This paper describes the recently revised designs of the critical interfaces between the modular coils, the construction solutions developed to meet assembly tolerances, and the recently revised trim coil system that provides the required compensation to correct for the “as built” conditions and to allow flexibility in the disposition of as-built conditions. In May, 2008, the sponsor decided to terminate the NCSX project due to growth in the project’s cost and schedule estimates. However significant technical challenges in design and construction were overcome, greatly reducing the risk in the remaining work to complete the project.

  5. Houston, Texas design/build house. Case study report

    SciTech Connect (OSTI)

    Borden, J. O.; Porter, C. B.

    1981-06-01

    The task activities relating to the Houston house, including problems, constructive comments, and successes, are described. Included in appendices are: cost data, methodology for ranking cities, house information sheet, thermal performance analysis, architectural information release, press releases and news clippings, and house pictures. One appendix was abstracted separately. (MHR)

  6. Passive solar commercial buildings: design assistance and demonstration program. Phase 1. Final report

    SciTech Connect (OSTI)

    1981-01-26

    The final design of the Mount Airy Public Library is given. Incremental passive design costs are discussed. Performance and economic analyses are made and the results reported. The design process is thoroughly documented. Considerations discussed are: (1) building energy needs; (2) site energy potentials, (3) matching energy needs with site energy potentials, (4) design indicators for best strategies and concepts, (5) schematic design alternatives, (6) performance testing of the alternatives, (7) design selection, and (8) design development. Weather data and Duke Power electric rates are included. (LEW)

  7. Analysis of Code-Compliant Construction in Texas Based on Texas Building Energy Performance Standards (TBEPS) 

    E-Print Network [OSTI]

    Mukhopadhyay, J.; Baltazar, J.C.; Kim, H.; Yazdani, B.; Haberl, J.

    2013-01-01

    of the 2012 IECC compared to the 2009 IECC for new residential buildings in Texas, including the DOE analysis performed by Pacific Northwest National Laboratory (PNNL) (DOE 2012); and the analysis by Building Codes Assistance Project (BCAP) (2012a-2012c..., Montreal, Quebec, October 8-11, 2013 ESL-IC-13-10-03 9 Comparison with Other Studies Several other studies examined the commercial provisions of the 2012 IECC compared to the 2009 IECC, including the two analyses performed by PNNL (Halverson...

  8. Calculation of NOx Emissions Reductions From Energy Efficient Residential Building Construction in Texas 

    E-Print Network [OSTI]

    Haberl, J. S.; Culp, C.; Gilman, D.; Yazdani, B.; Fitzpatrick, T.; Muns, S.

    2006-05-23

    . These areas face severe sanctions if attainment is not reached by 2007. This paper provides an overview of the procedures that have been developed and used to calculate the electricity savings and NOx reductions from code-compliant residential construction...

  9. Design, Construction and Test of Cryogen-Free HTS Coil Structure

    SciTech Connect (OSTI)

    Hocker, H.; Anerella, M.; Gupta, R.; Plate, S.; Sampson, W.; Schmalzle, J.; Shiroyanagi, Y.

    2011-03-28

    This paper will describe design, construction and test results of a cryo-mechanical structure to study coils made with the second generation High Temperature Superconductor (HTS) for the Facility for Rare Isotope Beams (FRIB). A magnet comprised of HTS coils mounted in a vacuum vessel and conduction-cooled with Gifford-McMahon cycle cryocoolers is used to develop and refine design and construction techniques. The study of these techniques and their effect on operations provides a better understanding of the use of cryogen free magnets in future accelerator projects. A cryogen-free, superconducting HTS magnet possesses certain operational advantages over cryogenically cooled, low temperature superconducting magnets.

  10. Dalhousie Sustainable Building Policy March 2011

    E-Print Network [OSTI]

    Brownstone, Rob

    .2 LEED Rating System "The Leadership in Energy and Environmental Design (LEED) Green Building Rating of Principles, and Plan. This policy formalizes Dalhousie's existing practice and commitment to green building as demonstrated by the design and construction of a number of energy efficient buildings from the 90s to the LEED

  11. The construction of a building capable of hosting the nation's supercomputers for the next decades

    E-Print Network [OSTI]

    be a modular and flexible building and as sustainable and energy-efficient as possible. The parameter by which the energy efficiency of a supercomputer centre is measured is the PUE rating (power usage effectiveness ambitious for a supercomputing centre. For this reason, CSCS is today one of the most energy-efficient

  12. Whole Building Design Guide Courses | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia: EnergyMaryland:Meadow Lake,Maine: Energy ResourcesWhole Building

  13. Improving Building Design and Operation of a Thai Buddhist Temple 

    E-Print Network [OSTI]

    Sreshthaputra, A.; Haberl, J.S.; Andrews, M.J.

    2004-01-01

    -building calculations. Prior to calculating the airflow with CFD, a network airflow model was used in conjunction with ESP-r to calculate the inlet air velocity and temperature, includ- ing the surface heat flux. CFD then used these boundary conditions to calculate... the results are passed on to CFD. This is why the network airflow model was added into the thermal simulation pro- cess. However, it is not necessary for this study because the case-study temple only has one ventilated zone and there is no HVAC system...

  14. Building and Home Design Products and Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:I DueBETOof Energy Strong,EnergyaBuilding and

  15. Building Design for Moderate Seismic Regions Peter J. Cheever, LeMessurier Consultants, Cambridge, MA, pcheever@lemessurier.com

    E-Print Network [OSTI]

    Hines, Eric

    Building Design for Moderate Seismic Regions Authors: Peter J. Cheever, LeMessurier Consultants which result in most buildings being designed for Seismic Design Category C, including special seismic detailing consistent with the 1992 AISC Seismic Provisions. Spectral design acceleration values

  16. EUROSTEEL 2011, August 31 -September 2, 2011, Budapest, Hungary CAPACITY DESIGN IN SEISMIC RESISTANT STEEL BUILDINGS

    E-Print Network [OSTI]

    Baker, Jack W.

    EUROSTEEL 2011, August 31 - September 2, 2011, Budapest, Hungary CAPACITY DESIGN IN SEISMIC. In seismic resistant structural steel buildings, so-called "deformation controlled" or "fuse" components are designed to yield and dissipate energy, and in the process to shield other "force controlled" or "non

  17. 1 Design and testing of a control strategy for a large, 2 naturally ventilated office building

    E-Print Network [OSTI]

    Linden, Paul F.

    of the building has been designed and tested using a 15 modified version of EnergyPlus. Results from studies with EnergyPlus and com- 16 putational fluid dynamics (CFD) are used in designing the control strategy. Ener weather. The control strategy has 10 window 24 opening modes. EnergyPlus was extended to simulate

  18. DESIGN-BUILD TEAMS AT AEROSPATIALE by Daniel E. Whitney, Liaison Scientist, Manufacturing

    E-Print Network [OSTI]

    Whitney, Daniel

    are made by outside contractors. The French data exchange standard SET (Standard Exchange and TransferDESIGN-BUILD TEAMS AT AEROSPATIALE by Daniel E. Whitney, Liaison Scientist, Manufacturing Summary this problem. History of CAD/CAM at Aerospatiale Computer-Aided Design and Computer-Aided Manufacturing (CAD

  19. Building E-education platform for design-oriented learning

    E-Print Network [OSTI]

    Ning, Hai, 1974-

    2004-01-01

    Design-oriented learning requires tools that support creative processes and student-to-student and student-to-faculty interactions. While most present E-Education systems perform as the asynchronous distribution channel ...

  20. Climatic design in the city : a residential building in Athens

    E-Print Network [OSTI]

    Papadimitriou, Panagis A

    1985-01-01

    The scope of this study is to examine the potential limitations and specific methods which can be used in applying climatic design principles in a densely populated urban environment. For illustrative purposes. a typical ...

  1. Whole Building Performance-Based Procurement Training | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Best Practices for Controlling Capital Costs in Net Zero Energy Design and Construction - 2014 BTO Peer Review Solar Decathlon Building America...

  2. SOME ANALYTIC MODELS OF PASSIVE SOLAR BUILDING PERFORMANCE: A THEORETICAL APPROACH TO THE DESIGN OF ENERGY-CONSERVING BUILDINGS

    E-Print Network [OSTI]

    Goldstein, David Baird

    2011-01-01

    performance of 5 passive buildings. 3a. See Ref. 3a and thewell-performing passive building requires the use of anwork for unmanaged passive buildings; that is, buildings

  3. Interoperability Building Information Modeling and acoustical analysis software - A demonstration of a performing arts hall design process

    E-Print Network [OSTI]

    Kim, Sunyoung; Coffeen, Robert C.; Sanguinetti, Paola

    2013-06-02

    By sharing and managing the database for a building model, Building Information Modeling (BIM) facilitates the design process at less cost. Some of BIM software has capabilities for acoustical analysis, but it is limited to noise level demonstration...

  4. Design and construction of coke battery 1A at Radlin coke plant, Poland

    SciTech Connect (OSTI)

    A.M. Kravchenko; D.P. Yarmoshik; V.B. Kamenyuka; G.E. Kos'kova; N.I. Shkol'naya; V.V. Derevich; A.S. Grankin [Giprokoks, the State Institute for the Design of Coke-Industry Enterprises, Kharkov (Ukraine)

    2009-07-15

    In the design and construction of coke battery 1A at Radlin coke plant (Poland), coking of rammed coke with a stationary system was employed for the first time. The coke batteries are grouped in blocks. Safety railings are provided on the coke and machine sides of the maintenance areas.

  5. Design of a New Cascade Reaction for the Construction of Complex Acyclic Architecture: The

    E-Print Network [OSTI]

    MacMillan, David W. C.

    Design of a New Cascade Reaction for the Construction of Complex Acyclic Architecture: The Tandem established as powerful chemical tools for the rapid formation of complex cyclic and polycyclic architecture.1,3,6-trisubstituted-1,7-dioxoheptane architecture (eq 1). This versatile cascade sequence is conducted by using simple

  6. Systematic design methodology and construction of UAV helicopters q Guowei Cai, Lin Feng, Ben M. Chen *, Tong H. Lee

    E-Print Network [OSTI]

    Benmei, Chen

    Systematic design methodology and construction of UAV helicopters q Guowei Cai, Lin Feng, Ben M 2008 Keywords: UAV helicopters Virtual design environment Anti-vibration Hardware construction a b-scale UAV helicop- ters. The systematic design procedure, which includes hardware component selection

  7. Residential building design : comprehensive comparative guidelines for building single-family dwellings in Hawaii

    E-Print Network [OSTI]

    Nagata, Rochelle Morie

    1997-01-01

    Energy shortages, earthquakes, and hurricanes are environmental factors that challenge the home designers of Hawaii. The depletion of renewable natural resources and global warming trends foreshadow energy shortage and the ...

  8. Final Environmental Assessment for the construction and operation of an office building at the Stanford Linear Accelerator Center. Part 2

    SciTech Connect (OSTI)

    1995-08-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1107, analyzing the environmental effects relating to the construction and operation of an office building at the Stanford Linear Accelerator Center (SLAC). SLAC is a national facility operated by Stanford University, California, under contract with DOE. The center is dedicated to research in elementary particle physics and in those fields that make use of its synchrotron facilities. The objective for the construction and operation of an office building is to provide adequate office space for existing SLAC Waste Management (WM) personnel, so as to centralize WM personnel and to make WM operations more efficient and effective. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI).

  9. GREEN BUILDING TRENDS How Green Building Impacted the National Capital Region Between 2003 and 2009

    E-Print Network [OSTI]

    GREEN BUILDING TRENDS How Green Building Impacted the National Capital Region Between 2003 and 2009 ecofriend.org 2 OVERVIEW What is LEED®? The LEED green building certification program is rapidly emerging as the standard in sustainable building design, construction, and operations. Scale of LEED Development Through

  10. Building

    U.S. Energy Information Administration (EIA) Indexed Site

    DIV. Electricity Consumption and Expenditure Intensities by Census Division, 1999" ,"Electricity Consumption",,,"Electricity Expenditures" ,"per Building (thousand kWh)","per...

  11. BaaS Project: Covering the Building Design and Operational-Phase Interoperability Gap 

    E-Print Network [OSTI]

    Valmaseda, C.; Garcia, M.; Hernandez, J.; Martin, S.

    2012-01-01

    ?modelling?and?simulation?for?energy?performance? estimation?and?control?design. SO2:?Integrated?Automation?and?Control?Services. TO1: Data?Management:?Working?on?existing?initiatives?and?ongoing projects?results,?integrating?State?of?the?Art?of?extended?BIM,?EEB? Ontologies?and?Standards. TO2:?System?Integration...?the?profit?margin?of?the? end?user?(ESCO) 3.1 Rates to estimate consumes & other variables (Energy, Economy) X X X X X X 4 Different?Building?Management? System?in?each?building?and?across? buildings 4.1 Management integration system and adjusted optimization logic...

  12. Design And Construction of a W-Band Sheet Beam Klystron

    SciTech Connect (OSTI)

    Scheitrum, G.; /SLAC

    2006-02-14

    The design and construction of a 100 kW peak power, 2% duty, PCM focused, Wband sheet beam klystron is discussed. The elliptical cross section beam is produced by a new electron gun design using a cylindrical cathode and a racetrack shaped focus electrode. The multi-gap cavities produce acceptable values of R/Q and are designed to produce a uniform electric field over the width of the 12:1 aspect ratio beam. The prototype cavities are produced using normal machining however, LIGA will be used to fabricate the cavities in production versions.

  13. Buildings Energy Data Book: 1.3 Value of Construction and Research

    Buildings Energy Data Book [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center HomeVehicle Replacement U.S. Residential and6 2025 U.S.277 Buildings

  14. Energy Performance Evaluation and Development of Control Strategies for the Air-conditioning System of a Building at Construction Stage 

    E-Print Network [OSTI]

    Wang, S.; Xu, X.; Ma, Z.

    2006-01-01

    Energy consumption of HVAC systems in commercial buildings takes a great part of the total building energy consumption. Energy performance evaluation plays an important role in building energy efficiency improvement for existing buildings and new...

  15. Rules Establishing Minimum Standards Relating to Location, Design, Construction, and Maintenance of Onsite Wastewater Treatment Systems (Rhode Island)

    Broader source: Energy.gov [DOE]

    The purpose of these rules is to protect public health and the environment by establishing minimum standards for the proper location, design, construction and maintenance of onsite wastewater...

  16. Building technologies

    SciTech Connect (OSTI)

    Jackson, Roderick

    2014-07-14

    After growing up on construction sites, Roderick Jackson is now helping to make buildings nationwide far more energy efficient.

  17. Building technologies

    ScienceCinema (OSTI)

    Jackson, Roderick

    2014-07-15

    After growing up on construction sites, Roderick Jackson is now helping to make buildings nationwide far more energy efficient.

  18. Integrated Building Energy Systems Design Considering Storage Technologies

    SciTech Connect (OSTI)

    Stadler, Michael; Marnay, Chris; Siddiqui, Afzal; Lai, Judy; Aki, Hirohisa

    2009-04-07

    The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic, as well as environmental attraction of micro-generation systems (e.g., PV or fuel cells with or without CHP) and contribute to enhanced demand response. The interactions among PV, solar thermal, and storage systems can be complex, depending on the tariff structure, load profile, etc. In order to examine the impact of storage technologies on demand response and CO2 emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that can pursue two strategies as its objective function. These two strategies are minimization of its annual energy costs or of its CO2 emissions. The problem is solved for a given test year at representative customer sites, e.g., nursing homes, to obtain not only the optimal investment portfolio, but also the optimal hourly operating schedules for the selected technologies. This paper focuses on analysis of storage technologies in micro-generation optimization on a building level, with example applications in New York State and California. It shows results from a two-year research projectperformed for the U.S. Department of Energy and ongoing work. Contrary to established expectations, our results indicate that PV and electric storage adoption compete rather than supplement each other considering the tariff structure and costs of electricity supply. The work shows that high electricity tariffs during on-peak hours are a significant driver for the adoption of electric storage technologies. To satisfy the site's objective of minimizing energy costs, the batteries have to be charged by grid power during off-peak hours instead of PV during on-peak hours. In contrast, we also show a CO2 minimization strategy where the common assumption that batteries can be charged by PV can be fulfilled at extraordinarily high energy costs for the site.

  19. NREL's OpenStudio Helps Design More Efficient Buildings (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-07-01

    The National Renewable Energy Laboratory (NREL) has created the OpenStudio software platform that makes it easier for architects and engineers to evaluate building energy efficiency measures throughout the design process. OpenStudio makes energy modeling more accessible and affordable, helping professionals to design structures with lower utility bills and less carbon emissions, resulting in a healthier environment. OpenStudio includes a user-friendly application suite that makes the U.S. Department of Energy's EnergyPlus and Radiance simulation engines easier to use for whole building energy and daylighting performance analysis. OpenStudio is freely available and runs on Windows, Mac, and Linux operating systems.

  20. Seismic fragility estimates for reinforced concrete framed buildings 

    E-Print Network [OSTI]

    Ramamoorthy, Sathish Kumar

    2007-04-25

    Gravity load designed (GLD) reinforced concrete (RC) buildings represent a common type of construction in the Mid-America Region. These buildings have limited lateral resistance and are susceptible to story mechanisms during earthquake loading...

  1. ADDRESSING “BEHIND THE SCENES” ECOLOGICAL CONCERNS ASSOCIATED WITH THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF AN URBAN TRANSPORTATION SYSTEM– A NEW YORK CITY TRANSIT PERSPECTIVE ON SUSTAINABILITY

    E-Print Network [OSTI]

    Singh, Ajay; Ramdahin, Dennis; Topielski, Bogdan; Raman, Ramesh Raman

    2003-01-01

    DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF AN URBANprocurement and operations and maintenance activities. This

  2. Technical Support Document: The Development of the Advanced Energy Design Guide for Highway Lodging Buildings

    SciTech Connect (OSTI)

    Jiang, Wei; Jarnagin, Ronald E.; Gowri, Krishnan; McBride, M.; Liu, Bing

    2008-09-30

    This Technical Support Document (TSD) describes the process and methodology for development of the Advanced Energy Design Guide for Highway Lodgings (AEDG-HL or the Guide), a design guidance document intended to provide recommendations for achieving 30% energy savings in highway lodging properties over levels contained in ANSI/ASHRAE/IESNA Standard 90.1-1999, Energy Standard for Buildings Except Low-Rise Residential Buildings. The AEDG-HL is the fifth in a series of guides being developed by a partnership of organizations, including the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE), the American Institute of Architects (AIA), the Illuminating Engineering Society of North America (IESNA), the United States Green Buildings Council (USGBC), and the U.S. Department of Energy (DOE).

  3. Using existing technologies, designers and operators of large buildings could slash national energy use across a broad

    E-Print Network [OSTI]

    Using existing technologies, designers and operators of large buildings could slash national energy of large office buildings and hospitals achieve at least a 50% energy savings using existing technology. Strategies for 50% Energy Savings in Large Office Buildings found that a 50% energy savings can be realized

  4. IMPACT OF THE CLIMATE ON THE DESIGN OF LOW-ENERGY BUILDINGS FOR AUSTRALIA AND REUNION ISLAND

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    IMPACT OF THE CLIMATE ON THE DESIGN OF LOW-ENERGY BUILDINGS FOR AUSTRALIA AND REUNION ISLAND B of low energy building. This approach is to perform a real evaluation of the sensation of thermal comfort. This article discusses the comparison of the thermal comfort levels obtained in the same building located

  5. Design and construction of a radiation resistant quadrupole using metal oxide insulated CICC

    SciTech Connect (OSTI)

    Albert F. Zeller

    2012-12-28

    The construction of a engineering test model of a radiation resistant quadrupole is described. The cold-iron quadrupole uses coils fabricated from metal-oixide (synthetic spinel) insulated Cable-In-Conduit-Conductor (CICC). The superconductor is NbTi in a copper matrix. The quadrupole is designed to produce a pole-tip field of 2 T with an operating current of 7,000 A.

  6. Design, construction, and use of a coiled tubing drilling structure for onshore and offshore operations

    SciTech Connect (OSTI)

    Frishmuth, R.E.; Pursell, J.C.; Middleton, R.J.; Parker, C.O.

    1996-12-31

    This paper discusses the design, construction, and initial application of a structure for supporting a coiled tubing injector head, bottom hole drilling assembly and pressurized lubricator. The paper includes a discussion of the features desired for the structure and how these were addressed during the design. The manufacturing of the support tower and its support platform are then discussed. On site assembly procedures for the movable structure are presented along with photographs of the deployed rig in service. The versatility and usefulness of the structure are discussed from the end users point of view.

  7. Category theory based solution for the building block replacement problem in materials design

    E-Print Network [OSTI]

    Spivak, David

    1 Category theory based solution for the building block replacement problem in materials design blocks, theory, modeling, mathematics, hierarchical materials Submitted to: Advanced Engineering be replaced by other molecular structures, such as weak van der Waals or hydrogen bonds, without compromising

  8. Project REED (Residential Energy Efficiency Design) is a Web-based building performance simulation tool

    E-Print Network [OSTI]

    ABSTRACT Project REED (Residential Energy Efficiency Design) is a Web-based building performance or kilowatts of elec- tricity. Their bottom line is money. REED is an easy-to-use, ratepayer-friendly web system. The simulation engine behind this new web site is SO- LAR-5, one of the nations most widely used

  9. Heat Transfer in Buildings: Application to Solar Air Collector and Trombe Wall Design

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    11 Heat Transfer in Buildings: Application to Solar Air Collector and Trombe Wall Design H. Boyer applications are finally discussed. One concerns the modeling of a flat plate air collector and the second focuses on the modeling of Trombe solar walls. In each case, detailed modeling of heat transfer allows

  10. Evaluating Indoor Air Quality (IAQ) as Modifying Factor in Designing Public School Buildings in Jordan 

    E-Print Network [OSTI]

    Ali, H. H.; Al-Momani, H.

    2004-01-01

    Air Quality (IAQ) as Modifying Factor in Designing Public School Buildings in Jordan Hikmat H. Ali, Ph.D. Hind Al...-Momani Department of Architecture Jordan University of Science and Technology Irbid-Jordan Hikmat_ali@yahoo.com Hikmat@just.edu.jo Phone (962) 2-7201000 Fax (962...

  11. EA-2020: Energy Efficiency Design Standards for New Federal Low-Rise Residential Buildings (RIN# 1904-AD56)

    Broader source: Energy.gov [DOE]

    This EA will evaluate the potential environmental impacts of implementing the provisions in the Energy Conservation and Production Act (ECPA) that require DOE to update the baseline Federal energy efficiency performance standards for the construction of new Federal buildings, including low-rise residential buildings.

  12. DNA Assembly Line for Nano-Construction

    ScienceCinema (OSTI)

    Oleg Gang

    2010-01-08

    Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

  13. Designing an Urban Food-Vending Stand Objective: Design and build a prototype for an urban food-vending stand that

    E-Print Network [OSTI]

    Wolberg, George

    for flowers and newspapers/magazines). It will be an exploration of how energy efficiency relates to the formDesigning an Urban Food-Vending Stand Objective: Design and build a prototype for an urban food, e.g., super-insulated building envelopes, and renewable energy systems. And it applies analytical

  14. Integrated canopy, building energy and radiosity model for 3D urban design

    E-Print Network [OSTI]

    Burdet, Etienne; Morand, Denis; Diab, Youssef

    2014-01-01

    We present an integrated, three dimensional, model of urban canopy, building energy and radiosity, for early stage urban designs and test it on four urban morphologies. All sub-models share a common descriptions of the urban morphology, similar to 3D urban design master plans and have simple parameters. The canopy model is a multilayer model, with a new discrete layer approach that does not rely on simplified geometry such as canyon or regular arrays. The building energy model is a simplified RC equivalent model, with no hypotheses on internal zoning or wall composition. We use the CitySim software for the radiosity model. We study the effects of convexity, the number of buildings and building height, at constant density and thermal characteristics. Our results suggest that careful three dimensional morphology design can reduce heat demand by a factor of 2, especially by improving insolation of lower levels. The most energy efficient morphology in our simulations has both the highest surface/volume ratio and ...

  15. Leveraging Health Data to Enhance Place-Based Resiliance in Green Building Design 

    E-Print Network [OSTI]

    Houghton, A.

    2013-01-01

    -12-10 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Green Building & Climate Change Vulnerability Credit Groupings Passive Survivability Flooding Heat Reduce Exposure © 2013 Biositu, LLC ESL-KT-13-12-10 CATEE... to Enhance Place-Based Resilience in Green Building Designs Clean Air Through Energy Efficiency (CATEE) Conference December 17, 2013 ADELE HOUGHTON, AIA; MPH; LEED AP BD+C, O+M, ND President, Biositu, LLC ESL-KT-13-12-10 CATEE 2013: Clean Air...

  16. Ohio-Kentucky-Indiana Regional Council of Governments Solar Ready Construction Guidelines

    Broader source: Energy.gov [DOE]

    These voluntary guidelines are developed for the local governments of the OKI region to provide guidance for residential developers, home builders, and architects in the design and construction of new residential buildings. These guidelines are intended to guide a developer, architect, or other interested party through the components of building design required to prepare a building for future solar installation. These guidelines include best practices for solar-ready building design to minimize the costs of future solar installation while maximizing potential system efficiency and apply to site selection, building design, and building construction.

  17. Underfloor air distribution systems: Benefits and when to use the system in building design

    SciTech Connect (OSTI)

    McCarry, B.T. [Keen Engineering Co., Ltd., Vancouver, British Columbia (Canada)

    1995-12-31

    Underfloor air distribution systems are a viable option for mechanical system building design. They are comprised of raised floor panels with a supply air plenum in the void between the raised floor and the concrete structure. Supply air grilles are flush mounted to the floor to create a flat floor and walking surface. The engineering challenge is to determine when to use underfloor air distribution systems and how to effectively apply them. The best places to use this system are in owner-occupied buildings with a high churn rate and/or frequent technology changes. The benefits of this system include fresh air at the level where building occupants are located, forgiveness for variations in internal cooling loads, easy relocation of the supply air grilles to suit revised layouts, a reduction in energy costs for the mechanical system, and an improvement in indoor air quality.

  18. From design through operations-Results from new construction performance contract and beyond

    E-Print Network [OSTI]

    Motegi, Naoya; Piette, Mary Ann; Wentworth, Scott

    2002-01-01

    2002 ACEEE Summer Study on Energy Efficiency in Buildings.Summer Study on Energy Efficiency in Buildings, 8:165-177,Summer Study on Energy Efficiency in Buildings. Stein, Jeff

  19. Integration of Low Energy Technologies for Optimal Building and Space Conditioning Design

    SciTech Connect (OSTI)

    D.E. Fisher

    2006-01-07

    EnergyPlus is the DOE's newest building energy simulation engine. It was developed specifically to support the design of low energy building systems. This project focused on developing new low energy building simulation models for EnergyPlus, verifying and validating new and existing EnergyPlus models and transferring the new technology to the private sector. The project focused primarily on geothermal and radiant technologies, which are related by the fact that both are based on hydronic system design. As a result of this project eight peer reviewed journal and conference papers were added to the archival literature and five technical reports were published as M.S. theses and are available in the archival literature. In addition, several reports, including a trombe wall validation report were written for web publication. Thirteen new or significantly enhanced modules were added to the EnergyPlus source code and forty-two new or significantly enhanced sections were added to the EnergyPlus documentation as a result of this work. A low energy design guide was also developed as a pedagogical tool and is available for web publication. Finally several tools including a hybrid ground source heat pump optimization program and a geothermal heat pump parameter estimation tool were developed for research and design and are available for web publication.

  20. Compiler Construction--The Art of Niklaus Wirth 1 Compiler Construction

    E-Print Network [OSTI]

    Mössenböck, Hanspeter

    Compiler Construction--The Art of Niklaus Wirth 1 Compiler Construction The Art of Niklaus Wirth a master of language design but also a pioneer of compiler construction. For four decades he has refined his techniques for building simple, efficient and reliable compilers. This paper tries to collect some

  1. Archive Reference Buildings by Building Type: Warehouse

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  2. Archive Reference Buildings by Building Type: Supermarket

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  3. Constructal multi-scale package of vertical channels with natural convection and maximal heat transfer density. CONSTRUCTAL DESIGN: THE GENERATION OF MULTI-SCALE HEAT

    E-Print Network [OSTI]

    Kihm, IconKenneth David

    transfer density. CONSTRUCTAL DESIGN: THE GENERATION OF MULTI-SCALE HEAT AND FLUID FLOW STRUCTURES-scale structures in natural convection with the objective of maximizing the heat transfer density, or the heat transfer rate per unit of volume§ . The flow volume is filled with vertical equidistant heated blades

  4. The ALMA Band 9 receiver - Design, construction, characterization, and first light

    E-Print Network [OSTI]

    Baryshev, A M; Mena, F P; Klapwijk, T M; van Kempen, T A; Hogerheijde, M R; Jackson, B D; Adema, J; Gerlofsma, G J; Bekema, M E; Barkhof, J; de Haan-Stijkel, L H R; Bemt, M van den; Koops, A; Keizer, K; Pieters, C; Jagt, J Koops van het; Schaeffer, H H A; Zijlstra, T; Kroug, M; Lodewijk, C F J; Wielinga, K; Boland, W; de Graauw, M W M; van Dishoeck, E F; Jager, H; Wild, W

    2015-01-01

    We describe the design, construction, and characterization of the Band 9 heterodyne receivers (600-720 GHz) for the Atacama Large Millimeter / submillimeter Array (ALMA). The ALMA Band 9 receiver units ("cartridges"), which are installed in the telescope's front end, have been designed to detect and down-convert two orthogonal linear polarization components of the light collected by the ALMA antennas. The light entering the front end is refocused with a compact arrangement of mirrors, which is fully contained within the cartridge. The arrangement contains a grid to separate the polarizations and two beam splitters to combine each resulting beam with a local oscillator signal. The combined beams are fed into independent double-sideband mixers, each with a corrugated feedhorn coupling the radiation by way of a waveguide with backshort cavity into an impedance-tuned SIS junction that performs the heterodyne down-conversion. Finally, the generated intermediate frequency signals are amplified by cryogenic and room...

  5. Federal leadership in high performance and sustainable buildings: Memorandum of Understanding

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    With this Memorandum of Understanding (MOU), signatory agencies commit to federal leadership in the design, construction, and operation of High-Performance and Sustainable Buildings.

  6. The New American Home 2009: Las Vegas, Nevada; Building Technologies Program (Brochure)

    SciTech Connect (OSTI)

    2008-12-01

    This brochure details the New American Home 2009, which demonstrates the use of innovative building materials, cutting-edge design, and the latest construction techniques.

  7. New American Home 2010: Las Vegas, Nevada, Building Technologies Program (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-12-01

    This brochure details the New American Home 2010, which demonstrates the use of innovative building materials, cutting-edge design, and the latest construction techniques.

  8. Design, Construction, Transportation, Operation and Post-Occupancy Analysis for the Texas A&M Solar Decathlon House 

    E-Print Network [OSTI]

    Malhotra, M.; Ramirez, E.; Im, P.; Cho, S.; Canez, J.; Haberl, J.; Schaider, N.; Fisk, P.; Feigenbaum, L.

    2008-01-01

    This paper describes the design, construction, transportation, operation and post occupancy analysis of the 2007 Texas A&M Solar Decathlon House (TAMU SD house). The TAMU SD house was developed to be a modular house that ...

  9. Cost Estimating Database and Prototype Tool to Support Design and Construction of Rural and Small Urban Transit Facilities 

    E-Print Network [OSTI]

    Zheng, Yue

    2014-10-13

    Estimating design and construction costs in a consistent, reliable, and accurate way is critical for an organization since the information generated is the basis for: projecting program funds, prioritizing projects by ...

  10. SOME ANALYTIC MODELS OF PASSIVE SOLAR BUILDING PERFORMANCE: A THEORETICAL APPROACH TO THE DESIGN OF ENERGY-CONSERVING BUILDINGS

    E-Print Network [OSTI]

    Goldstein, David Baird

    2011-01-01

    widespread application of passive solar designs. To design a°F). OVERALL SUMMARY Passive solar design is one of severalfor a typical passive solar design, rendering this solution

  11. EA-1065: Proposed Construction and Operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to modify 14,900 square feet of an existing building (Building 64) at the U.S. Department of Energy's Lawrence Berkeley Laboratory to...

  12. Advanced insulations for refrigerator/freezers: The potential for new shell designs incorporating polymer barrier construction

    SciTech Connect (OSTI)

    Griffith, B.T.; Arasteh, D.

    1992-11-01

    The impending phase-out of chlorofluorocarbons (CFCs) used to expand foam insulation, combined with requirements for increased energy efficiency, make the use of non-CFC-based high performance insulation technologies increasingly attractive. The majority of current efforts are directed at using advanced insulations in the form of thin, flat low-conductivity gas-filled or evacuated orthogonal panels, which we refer to as Advanced Insulation Panels (AIPs). AIPs can be used in composite with blown polymer foams to improve insulation performance in refrigerator/freezers (R/Fs) of conventional design and manufacture. This AIP/foam composite approach is appealing because it appears to be a feasible, near-term method for incorporating advanced insulations into R/Fs without substantial redesign or retooling. However, the requirements for adequate flow of foam during the foam-in-place operation impose limitations on the allowable thickness and coverage area of AIPs. This report examines design alternatives which may offer a greater increase in overall thermal resistance than is possible with the use of AIP/foam composites in current R/F design. These design alternatives generally involve a basic redesign of the R/F taking into account the unique requirements of advanced insulations and the importance of minimizing thermal bridging with high thermal resistance insulations. The focus here is on R/F doors because they are relatively simple and independent R/F components and are therefore good candidates for development of alterative designs. R/F doors have significant thermal bridging problems due to the steel outer shell construction. A three dimensional finite difference computer modeling exercise of a R/F door geometry was used to compare the overall levels of thermal resistance (R-value) for various design configurations.

  13. Design, construction, and testing of the direct absorption receiver panel research experiment

    SciTech Connect (OSTI)

    Chavez, J.M.; Rush, E.E.; Matthews, C.W.; Stomp, J.M.; Imboden, J.; Dunkin, S.

    1990-01-01

    A panel research experiment (PRE) was designed, built, and tested as a scaled-down model of a direct absorption receiver (DAR). The PRE is a 3-MW{sub t}DAR experiment that will allow flow testing with molten nitrate salt and provide a test bed for DAR testing with actual solar heating. In a solar central receiver system DAR, the heat absorbing fluid (a blackened molten nitrate salt) flows in a thin film down a vertical panel (rather than through tubes as in conventional receiver designs) and absorbs the concentrated solar flux directly. The ability of the flowing salt film to absorb flux directly. The ability of the flowing salt film to absorb the incident solar flux depends on the panel design, hydraulic and thermal fluid flow characteristics, and fluid blackener properties. Testing of the PRE is being conducted to demonstrate the engineering feasibility of the DAR concept. The DAR concept is being investigated because it offers numerous potential performance and economic advantages for production of electricity when compared to other solar receiver designs. The PRE utilized a 1-m wide by 6-m long absorber panel. The salt flow tests are being used to investigate component performance, panel deformations, and fluid stability. Salt flow testing has demonstrated that all the DAR components work as designed and that there are fluid stability issues that need to be addressed. Future solar testing will include steady-state and transient experiments, thermal loss measurements, responses to severe flux and temperature gradients and determination of peak flux capability, and optimized operation. In this paper, we describe the design, construction, and some preliminary flow test results of the Panel Research Experiment. 11 refs., 8 figs., 2 tabs.

  14. Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings

    E-Print Network [OSTI]

    Piette, Mary Ann

    2010-01-01

    such as CEC, EPRI, Building Automation Control Network (is the lack of automation of building systems. Most DRresponse, automation, commercial, industrial buildings, peak

  15. Applying "Design for Disassembly" to connection design in steel structures

    E-Print Network [OSTI]

    Silverstein, Scott A. (Scott Aaron)

    2009-01-01

    Design for Disassembly (DfD), also known as Design for Deconstruction, is an emerging initiative of sustainable construction that favors disassembly over demolition, considering a building's full life cycle during the ...

  16. Building America

    SciTech Connect (OSTI)

    Brad Oberg

    2010-12-31

    IBACOS researched the constructability and viability issues of using high performance windows as one component of a larger approach to building houses that achieve the Building America 70% energy savings target.

  17. Berkeley Lab to Help Build Straw Bale Building

    SciTech Connect (OSTI)

    Worsham, S.A.; Van Mechelen, G.

    1998-12-01

    The Shorebird Environmental Learning Center (SELC) is a new straw bale building that will showcase current and future technologies and techniques that will reduce the environmental impacts of building construction and operations. The building will also serve as a living laboratory to test systems and monitor their performance. The project will be the model for a building process that stops using our precious resources and reduces waste pollution. The rice straw that will be used for the bale construction is generally waste material that is typically burned--millions of tons of it a year--especially in California's San Joaquin Valley. Buildings have significant impacts on the overall environment. Building operations, including lighting, heating, and cooling, consume about 30% of the energy used in the United States. Building construction and the processes into making building materials consume an additional 8% of total energy. Construction also accounts for 39% of wood consumed in the U S, while 25% of solid waste volume is construction and demolition (C &D) debris. The SELC will incorporate a variety of materials and techniques that will address these and other issues, while providing a model of environmentally considered design for Bay Area residents and builders. Environmental considerations include energy use in construction and operations, selection of materials, waste minimization, and indoor air quality. We have developed five major environmental goals for this project: (1) Minimize energy use in construction and operations; (2) Employ material sources that are renewable, salvaged, recycled, and/or recyclable; (3) Increase building lifespan with durable materials and designs that permit flexibility and modification with minimal demolition; (4) Reduce and strive to eliminate construction debris; and (5) Avoid products that create toxic pollutants and make a healthy indoor environment.

  18. Long Term Operation of Renewable Energy Building 

    E-Print Network [OSTI]

    Nelson, V.; Starcher, K.; Davis, D.

    1996-01-01

    As part of a renewable energy project, a building was designed and constructed to demonstrate several renewable energy technologies at the Wind Test Center of the Alternative Energy Institute (AEI). The systems are passive and active heating, solar...

  19. Engineer, design, construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase III: pilot-plant construction. Quarterly report, June 1-August 31, 1980

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    Technical progress during the period June 1 through August 31, 1980 included the following activities: The PSD permit approval was obtained from the US Environmental Protection Agency. The building permit was obtained from the Borough of Wood-Ridge. Installation designs incorporating modifications to the Total Energy System, Gas Turbine, Free Power Turbine and Waste Heat Boiler are in an advanced stage. Procurement has been initiated on all long lead material. The upper and lower PFB Vessel fabrication was started. Quotations for the Substructure Construction (Bid Package No. 1) are under review in preparation for issuing a purchase order in October 1980. Request for quotation on Structural Steelwork have been issued to potential bidders. Groundbreaking ceremonies took place on June 30, 1980 with the Assistant Secretary of the Department of Energy presiding and the Governor of New Jersey, a Congressional delegation and State Commissioner of Energy and Environment, Borough Officials among other dignitaries in attendance.

  20. Algorithmic Construction of Efficient Fractional Factorial Designs With Large Run Sizes

    E-Print Network [OSTI]

    Xu, H Q

    2007-01-01

    M. (2003), Theory and Construction Methods for Large Regular238. Chen, C. L. (1991), “Construction of Some Binary LinearMitchell, T. J. (1967), “The Construction of Saturated 2 k?p

  1. ISES'99, International Solar Energy Society, Jrusalem, ISRAEL, Juin 1999 BUILDING DESIGN IN TROPICAL CLIMATES. ELABORATION OF THE ECODOM

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    ISES'99, International Solar Energy Society, Jérusalem, ISRAEL, Juin 1999 BUILDING DESIGN of global quality standards for natural and low energy cooling in french tropical island buildings. Electric@univ-reunion.fr Robert Celaire Concept Energie, 1 rue Mirabeau, Lambesc,13410, France, (+33) 04 42 92 84 19, (+33) 04 42

  2. Education and Construction

    E-Print Network [OSTI]

    Bogyo, Matthew

    Construction Bioengineering/Chemical Engineering Building, Under Construction Lucile Packard Children Center Lyman Graduate Residences Sterling Quad Mirrielees Pearce Mitchell Houses Stanford Hospital

  3. Education and Construction

    E-Print Network [OSTI]

    Straight, Aaron

    Construction Bioengineering/Chemical Engineering Building, Under Construction Lucile Packard Children Graduate Residences Sterling Quad Mirrielees Pearce Mitchell Houses Stanford Hospital Varsity Lot Jordan

  4. Education and Construction

    E-Print Network [OSTI]

    Bogyo, Matthew

    Construction Bioengineering/Chemical Engineering Building, Under Construction Lucile Packard Children Residences Sterling Quad Mirrielees Pearce Mitchell Houses Stanford Hospital Varsity Lot Jordan Quad

  5. Education and Construction

    E-Print Network [OSTI]

    Bogyo, Matthew

    Construction Bioengineering/Chemical Engineering Building, Under Construction Lucile Packard Children Houses Schwab Residential Center Lyman Graduate Residences Sterling Quad Mirrielees Pearce Mitchell

  6. Education and Construction

    E-Print Network [OSTI]

    Bejerano, Gill

    Construction Bioengineering/Chemical Engineering Building, Under Construction Lucile Packard Children Wilbur Hall Kimball Hall Cowell Houses Schwab Residential Center Lyman Graduate Residences Sterling Quad

  7. Design and Construction of the NSTX Bakeout, Cooling and Vacuum Systems

    SciTech Connect (OSTI)

    L.E. Dudek; M. Kalish; R. Gernhardt; R.F. Parsells; W. Blanchard

    1999-11-01

    This paper will describe the design, construction and initial operation of the NSTX bakeout, water cooling and vacuum systems. The bakeout system is designed for two modes of operation. The first mode allows heating of the first wall components to 350 degrees C while the external vessel is cooled to 150 degrees C. The second mode cools the first wall to 150 degrees C and the external vessel to 50 degrees C. The system uses a low viscosity heat transfer oil which is capable of high temperature low pressure operation. The NSTX Torus Vacuum Pumping System (TVPS) is designed to achieve a base pressure of approximately 1x10 (superscript -8) Torr and to evacuate the plasma fuel gas loads in less than 5 minutes between discharges. The vacuum pumping system is capable of a pumping speed of approximately 3400 l/s for deuterium. The hardware consists of two turbo molecular pumps (TMPs) and a mechanical pump set consisting of a mechanical and a Roots blower pump. A PLC is used as the control system to provide remote monitoring, control and software interlock capability. The NSTX cooling water provides chilled, de ionized water for heat removal in the TF, OH and PF, power supplies, bus bar systems, and various diagnostics. The system provides flow monitoring via a PLC to prevent damage due to loss of flow.

  8. Design, construction, and calibration of a three-axis, high-frequency magnetic probe ,,B-dot probe... as a diagnostic for exploding plasmas

    E-Print Network [OSTI]

    California at Los Angles, University of

    Design, construction, and calibration of a three-axis, high-frequency magnetic probe ,,B-dot probe is discussed in detail from its design and construction to its calibration and use as diagnostic of fast transient effects in exploding plasmas. A design and construction method is presented as a means to reduce

  9. Design and Construction of Test Coils for the MICE Coupling Solenoid Magnet

    SciTech Connect (OSTI)

    Wang, Li; Pan, Heng; Xu, F.Y.; Liu, XioaKun; Chen, AnBin; Li, LanKai; Gou, XingLong; Wu, Hong; Green, Michael; Li, Darun; Strauss, Bruce

    2008-08-08

    The superconducting coupling solenoid to be applied in the Muon Ionization Cooling Experiment (MICE) is made from copper matrix Nb-Ti conductors with inner radius of 750 mm, length of 285 mm and thickness of 102.5 mm at room temperature. The magnetic field up to 2.6 T at the magnet centerline is to keep the muons within the MICE RF cavities. Its self inductance is around 592 H and its magnet stored energy is about 13 MJ at a full current of 210 A for the worst operation case of the MICE channel. The stress induced inside the coil during cool down and charging is relatively high. Two test coils are to build and test in order to validate the design method and develop the fabrication technique required for the coupling coil winding, one is 350 mm inner diameter and full length same as the coupling coil, and the other is one-quarter length and 1.5 m diameter. The 1.5 m diameter coil will be charged to strain conditions that are greater than would be encountered in the coupling coil. This paper presents detailed design of the test coils as well as developed winding skills. The analyses on stress in coil assemblies, AC loss, and quench process are carried out.

  10. SOME ANALYTIC MODELS OF PASSIVE SOLAR BUILDING PERFORMANCE: A THEORETICAL APPROACH TO THE DESIGN OF ENERGY-CONSERVING BUILDINGS

    E-Print Network [OSTI]

    Goldstein, David Baird

    2011-01-01

    during construction. many passive houses have performed muchif it occurred, the optimwll passive house would likely have

  11. End-to-end interoperability and workflows from building architecture design to one or more simulations

    DOE Patents [OSTI]

    Chao, Tian-Jy; Kim, Younghun

    2015-02-10

    An end-to-end interoperability and workflows from building architecture design to one or more simulations, in one aspect, may comprise establishing a BIM enablement platform architecture. A data model defines data entities and entity relationships for enabling the interoperability and workflows. A data definition language may be implemented that defines and creates a table schema of a database associated with the data model. Data management services and/or application programming interfaces may be implemented for interacting with the data model. Web services may also be provided for interacting with the data model via the Web. A user interface may be implemented that communicates with users and uses the BIM enablement platform architecture, the data model, the data definition language, data management services and application programming interfaces to provide functions to the users to perform work related to building information management.

  12. Designing Zero Energy Building for TehranB37B36:B44M35B36 

    E-Print Network [OSTI]

    Mirkhani, N.; Sadoughi, S.; Eshraghi, J.; Narjabadi, N.; Nakhaei, A.

    2012-01-01

    In this paper, design of a zero energy building (ZEB), a case study for Tehran, in a moderately warm climate, for a typical single family has been introduced. It is important to develop solar energy resource potential in ...

  13. Design and construction of the IMACS-IFU, a 2000-element integral field unit

    E-Print Network [OSTI]

    J. Schmoll; G. N. Dodsworth; R. Content; J. R. Allington-Smith

    2004-08-24

    The IMACS-IFU is an Integral Field Unit built for the IMACS spectrograph at the Magellan-I-Telescope at Las Campanas Observatory. It consists of two rectangular fields of 5 by 7 arcseconds, separated by roughly one arcminute. With a total number of 2000 spatial elements it is the second largest fiber-lenslet based IFU worldwide, working in a wavelength range between 400 and 900 nm. Due to the equally sized fields classical background subtraction, beam switching and shuffling are possible observation techniques. One particular design challenge was the single, half a metre long curved slit in combination with a non telecentric output. Besides the construction some preliminary results are described.

  14. Current status of design and construction of ENCOAL Mild Gasification Plant

    SciTech Connect (OSTI)

    Frederick, J.P.; Siddoway, M.A.; Coolidge, D.W.

    1992-01-01

    The ENCOAL project is demonstrating for the first time the integrated operation of several process steps: a. Coal drying on a rotary grate using convective heatin; b. Coal devolatilization on a rotary grate using convective heating; c. Hot particulate removal with cyclones integral solids cooling; and deactivation-passivation; e. Combustors operating on low-Btu gas from internal streams; f. Solids stabilization for storage and shipment; g. Computer control and optimization of a mild coal gasification process. The product fuels are expected to be used economically in commercial boilers and furnaces and to significantly reduce sulfur emissions at industrial and utility facilities currently burning high sulfur bituminous fuels or fuel oils thereby reducing acid rain-causing pollutants. The design and construction of the ENCOAL demonstration plan was done on a fast track basis, that is, these activities were extensively overlapped.

  15. Current status of design and construction of ENCOAL Mild Gasification Plant

    SciTech Connect (OSTI)

    Frederick, J.P.; Siddoway, M.A.; Coolidge, D.W.

    1992-11-01

    The ENCOAL project is demonstrating for the first time the integrated operation of several process steps: a. Coal drying on a rotary grate using convective heatin; b. Coal devolatilization on a rotary grate using convective heating; c. Hot particulate removal with cyclones integral solids cooling; and deactivation-passivation; e. Combustors operating on low-Btu gas from internal streams; f. Solids stabilization for storage and shipment; g. Computer control and optimization of a mild coal gasification process. The product fuels are expected to be used economically in commercial boilers and furnaces and to significantly reduce sulfur emissions at industrial and utility facilities currently burning high sulfur bituminous fuels or fuel oils thereby reducing acid rain-causing pollutants. The design and construction of the ENCOAL demonstration plan was done on a fast track basis, that is, these activities were extensively overlapped.

  16. More than just a school : an exploration in tractable neighborhood building stock

    E-Print Network [OSTI]

    Stevermer, John Alton

    1983-01-01

    Shortages in land and resources are stiffling new construction and forcing the pursuit of alternate means to satisfy society's space needs within the existing building stock. Most existing buildings were not designed for ...

  17. arXiv:quant-ph/0606161v120Jun2006 Exact and Approximate Unitary 2-Designs: Constructions and Applications

    E-Print Network [OSTI]

    Cleve, Richard

    a unitary 2-design. We describe an efficient construction for an exact unitary 2-design based only O(n log(1/)) gates, where n is the number of qubits and is an appropriate measure of precision. These results lead to a protocol with exponential resource savings over existing experimental methods

  18. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  19. A Case Study of the Use of BIM and Construction Operations Building Information Exchange (COBie) for Facility Management 

    E-Print Network [OSTI]

    Jawadekar, Salil

    2012-10-19

    , increasing customer satisfaction, and optimizing the operation and maintenance of our building systems to reduce energy usage. This paper studies projects where the concept of BIM for FM is being applied using COBie as the data handover tool. We... al. (2005), there exist nowadays two main challenges in intelligent building integration research. The first refers to overcoming the hindering factors imposed by the lack of interoperability amongst the building automation systems products from...

  20. 2015 Construction Safety Workshop Presentations

    Broader source: Energy.gov [DOE]

    2015 Construction Safety Workshop Presentations, June 16, 2015 - Forrestal Building - Washington, DC

  1. REVIEW REPORT: BUILDING C-400 THERMAL TREATMENT 90 PERCENT REMEDIAL DESIGN REPORT AND SITE INVESTIGATION, PGDP, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B; Jed Costanza, J; Eva Davis, E; Joe Rossabi, J; Lloyd (Bo) Stewart, L; Hans Stroo, H

    2007-08-15

    On 9 April 2007, the U.S. Department of Energy (DOE) Headquarters, Office of Soil and Groundwater Remediation (EM-22) initiated an Independent Technical Review (ITR) of the 90% Remedial Design Report (RDR) and Site Investigation (RDSI) for thermal treatment of trichloroethylene (TCE) in the soil and groundwater in the vicinity of Building C-400 at the Paducah Gaseous Diffusion Plant (PGDP). The general ITR goals were to assess the technical adequacy of the 90% RDSI and provide recommendations sufficient for DOE to determine if modifications are warranted pertaining to the design, schedule, or cost of implementing the proposed design. The ultimate goal of the effort was to assist the DOE Paducah/Portsmouth Project Office (PPPO) and their contractor team in ''removing'' the TCE source zone located near the C-400 Building. This report provides the ITR findings and recommendations and supporting evaluations as needed to facilitate use of the recommendations. The ITR team supports the remedial action objective (RAO) at C-400 to reduce the TCE source area via subsurface Electrical Resistance Heating (ERH). Further, the ITR team commends PPPO, their contractor team, regulators, and stakeholders for the significant efforts taken in preparing the 90% RDR. To maximize TCE removal at the target source area, several themes emerge from the review which the ITR team believes should be considered and addressed before implementing the thermal treatment. These themes include the need for: (1) Accurate and site-specific models as the basis to verify the ERH design for full-scale implementation for this challenging hydrogeologic setting; (2) Flexible project implementation and operation to allow the project team to respond to observations and data collected during construction and operation; (3) Defensible performance metrics and monitoring, appropriate for ERH, to ensure sufficient and efficient clean-up; and (4) Comprehensive (creative and diverse) contingencies to address the potential for system underperformance, and other unforeseen conditions These themes weave through the ITR report and the various analyses and recommendations. The ITR team recognizes that a number of technologies are available for treatment of TCE sources. Further, the team supports the regulatory process through which the selected remedy is being implemented, and concurs that ERH is a potentially viable remedial technology to meet the RAOs adjacent to C-400. Nonetheless, the ITR team concluded that additional efforts are needed to provide an adequate basis for the planned ERH design, particularly in the highly permeable Regional Gravel Aquifer (RGA), where sustaining target temperatures present a challenge. The ERH design modeling in the 90% RDR does not fully substantiate that heating in the deep RGA, at the interface with the McNairy formation, will meet the design goals; specifically the target temperatures. Full-scale implementation of ERH to meet the RAOs is a challenge in the complex hydrogeologic setting at PGDP. Where possible, risks to the project identified in this ITR report as ''issues'' and ''recommendations'' should be mitigated as part of the final design process to increase the likelihood of remedial success. The ITR efforts were organized into five lines of inquiry (LOIs): (1) Site investigation and target zone delineation; (2) Performance objectives; (3) Project and design topics; (4) Health and safety; and (5) Cross cutting and independent cost evaluation. Within each of these LOIs, the ITR team identified a series of unresolved issues--topics that have remaining uncertainties or potential project risks. These issues were analyzed and one or more recommendations were developed for each. In the end, the ITR team identified 27 issues and provided 50 recommendations. The issues and recommendations are briefly summarized below, developed in Section 5, and consolidated into a single list in Section 6. The ITR team concluded that there are substantive unresolved issues and system design uncertainties, resulting in technical and financial risks to DOE.

  2. Technical Support Document: Development of the Advanced Energy Design Guide for Medium to Big Box Retail Buildings - 50% Energy Savings

    SciTech Connect (OSTI)

    Bonnema, Eric; Leach, Matt; Pless, Shanti

    2013-06-05

    This Technical Support Document describes the process and methodology for the development of the Advanced Energy Design Guide for Medium to Big Box Retail Buildings: Achieving 50% Energy Savings Toward a Net Zero Energy Building (AEDG-MBBR) ASHRAE et al. (2011b). The AEDG-MBBR is intended to provide recommendations for achieving 50% whole-building energy savings in retail stores over levels achieved by following ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings (Standard 90.1-2004) (ASHRAE 2004b). The AEDG-MBBR was developed in collaboration with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), the American Institute of Architects (AIA), the Illuminating Engineering Society of North America (IES), the U.S. Green Building Council (USGBC), and the U.S. Department of Energy.

  3. Technical Support Document: Development of the Advanced Energy Design Guide for Medium to Big Box Retail Buildings - 50% Energy Savings

    SciTech Connect (OSTI)

    Bonnema, E.; Leach, M.; Pless, S.

    2013-06-01

    This Technical Support Document describes the process and methodology for the development of the Advanced Energy Design Guide for Medium to Big Box Retail Buildings: Achieving 50% Energy Savings Toward a Net Zero Energy Building (AEDG-MBBR) ASHRAE et al. (2011b). The AEDG-MBBR is intended to provide recommendations for achieving 50% whole-building energy savings in retail stores over levels achieved by following ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings (Standard 90.1-2004) (ASHRAE 2004b). The AEDG-MBBR was developed in collaboration with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), the American Institute of Architects (AIA), the Illuminating Engineering Society of North America (IES), the U.S. Green Building Council (USGBC), and the U.S. Department of Energy.

  4. Design and Construction of Large Size Micromegas Chambers for the Upgrade of the ATLAS Muon Spectrometer

    E-Print Network [OSTI]

    Lösel, Philipp

    2015-01-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about $\\mathbf{150~m^2}$ of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each layer covers more than $\\mathbf{2~m^2}$ for a total active area of $\\mathbf{1200~m^2}$. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15$\\mathbf{\\%}$ transverse momentum resolution for $\\mathbf{1~TeV}$ muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as $\\mathbf{30~\\mu m}$ along the precision coordinate and $\\mathbf{80~\\mu m}$ perpendicular to the chamber. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly ...

  5. Bringing simulation to implementation: Presentation of a global approach in the design of passive solar buildings under humid tropical climates

    E-Print Network [OSTI]

    Garde, François; Celaire, Robert

    2012-01-01

    In early 1995, a DSM pilot initiative has been launched in the French islands of Guadeloupe and Reunion through a partnership between several public and private partners (the French Public Utility EDF, the University of Reunion Island, low cost housing companies, architects, energy consultants, etc...) to set up standards to improve thermal design of new residential buildings in tropical climates. This partnership led to defining optimized bio-climatic urban planning and architectural designs featuring the use of passive cooling architectural principles (solar shading, natural ventilation) and components, as well as energy efficient systems and technologies. The design and sizing of each architectural component on internal thermal comfort in building has been assessed with a validated thermal and airflow building simulation software (CODYRUN). These technical specifications have been edited in a reference document which has been used to build over 300 new pilot dwellings through the years 1996-1998 in Reunion...

  6. Design and Construction of Large Size Micromegas Chambers for the Upgrade of the ATLAS Muon Spectrometer

    E-Print Network [OSTI]

    Philipp Lösel; Ralph Müller

    2015-08-11

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about $\\mathbf{150~m^2}$ of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each layer covers more than $\\mathbf{2~m^2}$ for a total active area of $\\mathbf{1200~m^2}$. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15$\\mathbf{\\%}$ transverse momentum resolution for $\\mathbf{1~TeV}$ muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as $\\mathbf{30~\\mu m}$ along the precision coordinate and $\\mathbf{80~\\mu m}$ perpendicular to the chamber. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis will be on the methods developed to achieve the challenging mechanical precision. Measurements and simulations of deformations created on chamber prototypes as a function of thermal gradients, internal stress (mesh tension and module fixation on supports) and gas over-pressure were essential in the development of the final design. During installation and operation all deformations and relative misalignments will be monitored by an optical alignment system and compensated in the tracking software.

  7. SOME ANALYTIC MODELS OF PASSIVE SOLAR BUILDING PERFORMANCE: A THEORETICAL APPROACH TO THE DESIGN OF ENERGY-CONSERVING BUILDINGS

    E-Print Network [OSTI]

    Goldstein, David Baird

    2011-01-01

    during construction. many passive houses have performed muchif it occurred, the optimwll passive house would likely havephotographs of a passive solar house at First Village in

  8. High Performance New Construction 

    E-Print Network [OSTI]

    Flores, M.

    2013-01-01

    -Build • Age Myth • Cost Myth • Complexity Myth • Time Advantage • Early Cost Confirmation • Lower Cost For Design Changes ESL-KT-13-12-40 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 What It Means … When... Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Facility Economics – Building Costs Over 40 yrs. Construction Financing Alterations Operations & Utility Costs 11% 14% 25% 50% ESL-KT-13-12-40 CATEE 2013: Clean Air Through Energy Efficiency...

  9. Abstract--Current building designs are not energy-efficient enough due to many reasons. One of them is the centralized

    E-Print Network [OSTI]

    Jain, Raj

    1 Abstract--Current building designs are not energy-efficient enough due to many reasons. One Building, Energy Efficiency, Energy Policy, Distributed Policy Control, Smart Energy I. INTRODUCTION the energy efficiency in the buildings besides finding new clean-energy sources. Most of the buildings

  10. System design and dynamic signature identification for intelligent energy management in residential buildings.

    E-Print Network [OSTI]

    Jang, Jaehwi

    2008-01-01

    Drewer and D. Gann, Smart buildings, Journal of Facilities ,smart energy management system specically for residential buildings.buildings is rooted in relative eectiveness per system by a smart

  11. Design, construction, and startup of a concentrating photovoltaic solar energy system in Hawaii: Phase II. Final report

    SciTech Connect (OSTI)

    Spencer, R.; Harper, R.; Maberry, G.; Bedard, R.; Rafinejad, D.

    1982-10-01

    Acurex Corporation has designed, constructed, and is now operating a 35-kWp concentrating photovoltaic solar system located at the G.N. Wilcox Memorial Hospital in Lihue, Kauai, Hawaii. The facility consists of 446 m/sup 2/ (4800 ft/sup 2/) of parabolic trough photovoltaic collectors, an electrical power generation system which converts the direct current field output into grid-compatible alternating current power, and a thermal power subsystem for heating the hospital potable water. This report summarizes the design, construction, startup, and performance of this solar facility.

  12. Modeling and Optimal Control Algorithm Design for HVAC Systems in Energy Efficient Buildings

    E-Print Network [OSTI]

    Maasoumy, Mehdi

    2014-01-01

    Litz. Simulation of thermal building behaviour in modelica.of the 2nd International Modelica Conference, volume 154.building behaviour using Modelica. Mathematical and Computer

  13. EA-1107: Construction and Operation of a Office Building at the Stanford Linear Accelerator Center, Berkeley, California

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposed project to modify existing Building 51B at the U.S. Department of Energy's Lawrence Berkeley National Laboratory to install and conduct...

  14. CDM as a Solution for the Present World Energy Problems (An Overview with Respect to the Building and Construction Sector) 

    E-Print Network [OSTI]

    Sudarsan, N.; Jayaraj, S.; Sreekanth, K. J.

    2010-01-01

    for more than one third of the total conventional energy use and associated greenhouse gas emissions. The Inter-governmental Panel on Climate Change (IPCC) stated that, the building sector has the largest potential for significantly reducing greenhouse gas...

  15. Improving the feasibility of building deconstruction and adaptability

    E-Print Network [OSTI]

    Quinn, Karen E. (Karen Elizabeth)

    2010-01-01

    Design for Adaptability and Deconstruction (DfAD) is an emerging trend in the construction industry that focuses on the end-of-life aspect of buildings. It is based on the concept that the life of a building or building ...

  16. Proto-CIRCUS Tilted-Coil Tokamak-Torsatron Hybrid: Design and Construction

    E-Print Network [OSTI]

    Clark, A W; Hammond, K C; Kornbluth, Y; Spong, D A; Sweeney, R; Volpe, F A

    2014-01-01

    We present the field-line modeling, design and construction of a prototype circular-coil tokamak-torsatron hybrid called Proto-CIRCUS. The device has a major radius R = 16 cm and minor radius a < 5 cm. The six "toroidal field" coils are planar as in a tokamak, but they are tilted. This, combined with induced or driven plasma current, is expected to generate rotational transform, as seen in field-line tracing and equilibrium calculations. The device is expected to operate at lower plasma current than a tokamak of comparable size and magnetic field, which might have interesting implications for disruptions and steady-state operation. Additionally, the toroidal magnetic ripple is less pronounced than in an equivalent tokamak in which the coils are not tilted. The tilted coils are interlocked, resulting in a relatively low aspect ratio, and can be moved, both radially and in tilt angle, between discharges. This capability will be exploited for detailed comparisons between calculations and field-line mapping me...

  17. The potential for distributed generation in Japanese prototype buildings: A DER-CAM analysis of policy, tariff design, building energy use, and technology development (Japanese translation)

    SciTech Connect (OSTI)

    Zhou, Nan; Marnay, Chris; Firestone, Ryan; Gao, Weijun; Nishida, Masaru

    2004-10-15

    The August 2003 blackout of the northeastern U.S. and CANADA caused great economic losses and inconvenience to New York City and other affected areas. The blackout was a warning to the rest of the world that the ability of conventional power systems to meet growing electricity demand is questionable. Failure of large power systems can lead to serious emergencies. Introduction of on-site generation, renewable energy such as solar and wind power and the effective utilization of exhaust heat is needed, to meet the growing energy demands of the residential and commercial sectors. Additional benefit can be achieved by integrating these distributed technologies into distributed energy resource (DER) systems. This work demonstrates a method for choosing and designing economically optimal DER systems. An additional purpose of this research is to establish a database of energy tariffs, DER technology cost and performance characteristics, and building energy consumption for Japan. This research builds on prior DER studies at the Ernest Orlando Lawrence Berkeley National Laboratory (LBNL) and with their associates in the Consortium for Electric Reliability Technology Solutions (CERTS) and operation, including the development of the microgrid concept, and the DER selection optimization program, the Distributed Energy Resources Customer Adoption Model (DER-CAM). DER-CAM is a tool designed to find the optimal combination of installed equipment and an idealized operating schedule to minimize a site's energy bills, given performance and cost data on available DER technologies, utility tariffs, and site electrical and thermal loads over a test period, usually an historic year. Since hourly electric and thermal energy data are rarely available, they are typically developed by building simulation for each of six end use loads used to model the building: electric-only loads, space heating, space cooling, refrigeration, water heating, and natural-gas-only loads. DER-CAM provides a global optimization, albeit idealized, that shows how the necessary useful energy loads can be provided for at minimum cost by selection and operation of on-site generation, heat recovery, cooling, and efficiency improvements. This study examines five prototype commercial buildings and uses DER-CAM to select the economically optimal DER system for each. The five building types are office, hospital, hotel, retail, and sports facility. Each building type was considered for both 5,000 and 10,000 square meter floor sizes. The energy consumption of these building types is based on building energy simulation and published literature. Based on the optimization results, energy conservation and the emissions reduction were also evaluated. Furthermore, a comparison study between Japan and the U.S. has been conducted covering the policy, technology and the utility tariffs effects on DER systems installations.

  18. Model Building Energy Code

    Broader source: Energy.gov [DOE]

    The Energy Efficiency Building Performance Standards (EEBPS) are statewide minimum requirements that all new construction and additions to existing buildings must satisfy. Exceptions include...

  19. Building Energy Code

    Broader source: Energy.gov [DOE]

    The Energy Conservation Construction Code of New York State (ECCCNYS) requires that all government, commercial and residential buildings, including renovations involving building system replaceme...

  20. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    SciTech Connect (OSTI)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

  1. Methodology for Flow Information Management in the Commissioning of Low Energy Buildings 

    E-Print Network [OSTI]

    Hannachi, N. K.; Jandon, M.; Nejad, H. V.

    2005-01-01

    few in number, these low-energy buildings represent a variety of building types and sizes built across the country, supported by a wide mix of owners and design teams. The barriers to the widespread design and construction of low-energy buildings do...

  2. Getting to Fifty: Moving Towards Low-Energy Commercial Buildings in the United States 

    E-Print Network [OSTI]

    Frankel, M.; Hewitt, D.; Egnor, T.

    2008-01-01

    few in number, these low-energy buildings represent a variety of building types and sizes built across the country, supported by a wide mix of owners and design teams. The barriers to the widespread design and construction of low-energy buildings do...

  3. The potential for distributed generation in Japanese prototype buildings: A DER-CAM analysis of policy, tariff design, building energy use, and technology development (English Version)

    SciTech Connect (OSTI)

    Zhou, Nan; Marnay, Chris; Firestone, Ryan; Gao, Weijun; Nishida, Masaru

    2004-10-15

    The August 2003 blackout of the northeastern U.S. and CANADA caused great economic losses and inconvenience to New York City and other affected areas. The blackout was a warning to the rest of the world that the ability of conventional power systems to meet growing electricity demand is questionable. Failure of large power systems can lead to serious emergencies. Introduction of on-site generation, renewable energy such as solar and wind power and the effective utilization of exhaust heat is needed, to meet the growing energy demands of the residential and commercial sectors. Additional benefit can be achieved by integrating these distributed technologies into distributed energy resource (DER) systems. This work demonstrates a method for choosing and designing economically optimal DER systems. An additional purpose of this research is to establish a database of energy tariffs, DER technology cost and performance characteristics, and building energy consumption for Japan. This research builds on prior DER studies at the Ernest Orlando Lawrence Berkeley National Laboratory (LBNL) and with their associates in the Consortium for Electric Reliability Technology Solutions (CERTS) and operation, including the development of the microgrid concept, and the DER selection optimization program, the Distributed Energy Resources Customer Adoption Model (DER-CAM). DER-CAM is a tool designed to find the optimal combination of installed equipment and an idealized operating schedule to minimize a site's energy bills, given performance and cost data on available DER technologies, utility tariffs, and site electrical and thermal loads over a test period, usually an historic year. Since hourly electric and thermal energy data are rarely available, they are typically developed by building simulation for each of six end use loads used to model the building: electric-only loads, space heating, space cooling, refrigeration, water heating, and natural-gas-only loads. DER-CAM provides a global optimization, albeit idealized, that shows how the necessary useful energy loads can be provided for at minimum cost by selection and operation of on-site generation, heat recovery, cooling, and efficiency improvements. This study examines five prototype commercial buildings and uses DER-CAM to select the economically optimal DER system for each. The five building types are office, hospital, hotel, retail, and sports facility. Each building type was considered for both 5,000 and 10,000 square meter floor sizes. The energy consumption of these building types is based on building energy simulation and published literature. Based on the optimization results, energy conservation and the emissions reduction were also evaluated. Furthermore, a comparison study between Japan and the U.S. has been conducted covering the policy, technology and the utility tariffs effects on DER systems installations. This study begins with an examination of existing DER research. Building energy loads were then generated through simulation (DOE-2) and scaled to match available load data in the literature. Energy tariffs in Japan and the U.S. were then compared: electricity prices did not differ significantly, while commercial gas prices in Japan are much higher than in the U.S. For smaller DER systems, the installation costs in Japan are more than twice those in the U.S., but this difference becomes smaller with larger systems. In Japan, DER systems are eligible for a 1/3 rebate of installation costs, while subsidies in the U.S. vary significantly by region and application. For 10,000 m{sup 2} buildings, significant decreases in fuel consumption, carbon emissions, and energy costs were seen in the economically optimal results. This was most noticeable in the sports facility, followed the hospital and hotel. This research demonstrates that office buildings can benefit from CHP, in contrast to popular opinion. For hospitals and sports facilities, the use of waste heat is particularly effective for water and space heating. For the other building types, waste heat is most effectively use

  4. Construction Certifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Certifications Individual Permit: Construction Certifications Enhanced control measures were designed and installed at 67 Sites in 42 SMAs in 2012. Contact Environmental...

  5. Important Tenders and Contracts to be Placed in the Near Future - Concrete and Masonry Construction Work for the Control Station and Part of the Annex Laboratory Wing and the Corridor which Connects them to the Main SC Building

    E-Print Network [OSTI]

    European Organization for Nuclear Research

    1955-01-01

    Important Tenders and Contracts to be Placed in the Near Future - Concrete and Masonry Construction Work for the Control Station and Part of the Annex Laboratory Wing and the Corridor which Connects them to the Main SC Building

  6. Solar heating and cooling of residential buildings: design of systems, 1980 edition

    SciTech Connect (OSTI)

    1980-09-01

    This manual was prepared primarily for use in conducting a practical training course on the design of solar heating and cooling systems for residential and small office buildings, but may also be useful as a general reference text. The content level is appropriate for persons with different and varied backgrounds, although it is assumed that readers possess a basic understanding of heating, ventilating, and air-conditioning systems of conventional (non-solar) types. This edition is a revision of the manual with the same title, first printed and distributed by the US Government Printing Office in October 1977. The manual has been reorganized, new material has been added, and outdated information has been deleted. Only active solar systems are described. Liquid and air-heating solar systems for combined space and service water heating or service water heating are included. Furthermore, only systems with proven experience are discussed to any extent.

  7. Moksha--design of disposable objects for second uses as construction components

    E-Print Network [OSTI]

    Dutta, Projjal K. (Projjal Kumar)

    1997-01-01

    Moksha is the Sanskrit word for freedom from the cycle of rebirth. It is the goal of every living being. This thesis seeks a Moksha of the Machine Age. It attempts to explore the possibility of building value into "waste". ...

  8. The design of effective policies for the promotion of sustainable construction materials

    E-Print Network [OSTI]

    Kua, Harn Wei, 1971-

    2006-01-01

    This research explores the associated effects of policy tools employed to promote sustainable building materials. By comparing the original motivations and intended effects of these policies and their actual outcome, and ...

  9. Design, Construction, and Visualization of Transparent Full Scale High Pressure Test Facility for Electronic Submersible Pumps 

    E-Print Network [OSTI]

    Marchetti, Joseph Michael

    2013-12-10

    Design ........................................................................................... 36 3.2.2 Impeller, Impeller Hub, and Shaft Design .................................................. 43 3.2.3 Casing, Split Rings, and Inlet Baffle Design... .............................................. 53 3.2.4 Inlet and Outlet Plenums, Mechanical Seals, and Mounting Plates ............ 59 3.2.5 Pump Mounts, Tie Rods, and Skid Design ................................................. 63 x 3.2.6 Power and Electrical Design...

  10. INL High Performance Building Strategy

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2010-02-01

    High performance buildings, also known as sustainable buildings and green buildings, are resource efficient structures that minimize the impact on the environment by using less energy and water, reduce solid waste and pollutants, and limit the depletion of natural resources while also providing a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) becomes the nation’s premier nuclear energy research laboratory, the physical infrastructure will be established to help accomplish this mission. This infrastructure, particularly the buildings, should incorporate high performance sustainable design features in order to be environmentally responsible and reflect an image of progressiveness and innovation to the public and prospective employees. Additionally, INL is a large consumer of energy that contributes to both carbon emissions and resource inefficiency. In the current climate of rising energy prices and political pressure for carbon reduction, this guide will help new construction project teams to design facilities that are sustainable and reduce energy costs, thereby reducing carbon emissions. With these concerns in mind, the recommendations described in the INL High Performance Building Strategy (previously called the INL Green Building Strategy) are intended to form the INL foundation for high performance building standards. This revised strategy incorporates the latest federal and DOE orders (Executive Order [EO] 13514, “Federal Leadership in Environmental, Energy, and Economic Performance” [2009], EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management” [2007], and DOE Order 430.2B, “Departmental Energy, Renewable Energy, and Transportation Management” [2008]), the latest guidelines, trends, and observations in high performance building construction, and the latest changes to the Leadership in Energy and Environmental Design (LEED®) Green Building Rating System (LEED 2009). The document employs a two-level approach for high performance building at INL. The first level identifies the requirements of the Guiding Principles for Sustainable New Construction and Major Renovations, and the second level recommends which credits should be met when LEED Gold certification is required.

  11. Proposal for the award of a contract, without competitive tendering, for the design and construction of a new 400 kV transmission feeder bay

    E-Print Network [OSTI]

    2015-01-01

    Proposal for the award of a contract, without competitive tendering, for the design and construction of a new 400 kV transmission feeder bay

  12. Reassessing Residential Design in Hawaii: Design Construction Building Analysis and Publishing Design Guidelines for a Passive-Design Model Home on Hawaiian Homeland 

    E-Print Network [OSTI]

    Meder, S.

    2006-01-01

    , University of Hawaii Sea Grant College Program Hawaii University of Hawaii School of Architecture ABSTRACT Hawaii is more reliant on fossil fuel for its electrical generation than any other state in the nation. Hawaii has the highest... Hawaii’s homes comfortable. This paper will describe a project where the State Department of Hawaii Homelands, the University of Hawaii School of Architecture, the Committee on the Environment for the Honolulu Chapter of American Institute...

  13. Making America's Buildings Better (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01

    This fact sheet is an overview of the U.S. Department of Energy's Building Technologies program. Buildings use more energy than any other sector of the U.S. economy? In fact, buildings consume more than 70% of the electricity and more than 50% of the natural gas Americans use. That's why the U.S. Department of Energy's (DOE's) Building Technologies Program (BTP) is working to improve building energy performance through high-impact research, out-reach, and regulatory efforts. These efforts will result in affordable, high-performance homes and commercial buildings. These grid-connected buildings will be more energy efficient than today's typical buildings, with renewable energy providing a portion of the power needs. They will combine energy-smart 'whole building' design and construction, appliances and equipment that minimize plug loads, and cost-effective photovoltaics or other on-site energy systems.

  14. Proposal for the Award of a Contract for the Civil Engineering work for the Building designed to House the LEP Pre-injector Linear Accelerator

    E-Print Network [OSTI]

    1982-01-01

    Proposal for the Award of a Contract for the Civil Engineering work for the Building designed to House the LEP Pre-injector Linear Accelerator

  15. Proposal for the award of a contract for the design, supply, installation and commissioning of an HVAC (Heating, Ventilation and Air Conditioning) system for Building 3862

    E-Print Network [OSTI]

    2014-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of an HVAC (Heating, Ventilation and Air Conditioning) system for Building 3862

  16. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    SciTech Connect (OSTI)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  17. Interoperability of Computer Aided Design and Energy Performance Simulation to Improve Building Energy Efficiency and Performance 

    E-Print Network [OSTI]

    Chaisuparasmikul, P.

    2006-01-01

    The paper describes very significant novel interoperability and data modeling technology for existing building that maps a building information parametric model with an energy simulation model, establishing a seamless link between Computer Aided...

  18. Critical Simulation Based Evaluation of Thermally Activated Building Systems (TABS) Design Models

    E-Print Network [OSTI]

    Basu, Chandrayee

    2012-01-01

    apps1.eere.energy.gov/buildings/energyplus/ [Internet] [building for CZ03 in EnergyPlus v7.0 under 2 different heatassistance in learning EnergyPlus, which could not have been

  19. Waste Handeling Building Conceptual Study

    SciTech Connect (OSTI)

    G.W. Rowe

    2000-11-06

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable, and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.

  20. Transaction-Cost Economic Analysis of Institutional Change toward Design-Build Contracts for Public Transportation

    E-Print Network [OSTI]

    Whittington, Jan; Dowall, David E.

    2006-01-01

    initiative to build Tacoma Narrows Bridge. Public–privateor scope, such as the Tacoma Narrows Bridge. Private sector

  1. Chapter 15: Commercial New Construction Protocol

    SciTech Connect (OSTI)

    Keates, S.

    2014-09-01

    This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) measures (or packages of measures) where evaluators can best analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol. Examples of such measures include Leadership in Energy and Environmental Design building certification, novel and/or efficient heating, ventilation, and air conditioning system designs, and extensive building controls systems. In general, it is best to evaluate any ECM (or set of measures) expected to significantly interact with other systems within the building and with savings sensitive to seasonal variations in weather.

  2. RTL Hardware Design Chapter 3 1

    E-Print Network [OSTI]

    Chu, Pong P.

    RTL Hardware Design by P. Chu Chapter 3 1 Basic Language Constructs of VHDL #12;RTL Hardware Design. Data type and operators #12;RTL Hardware Design by P. Chu Chapter 3 3 1. Basic VHDL program #12;RTL Hardware Design by P. Chu Chapter 3 4 Design unit · Building blocks in a VHDL program · Each design unit

  3. Improving Glass Walls Thermal Resistance In Air-Conditioned Buildings 

    E-Print Network [OSTI]

    Galal, T.; Kulaib, A. M.; Alajmi, R.; Al-Ansary. A; Abuzaid, M.

    2010-01-01

    walls; as one of envelope surfaces; has an important impact on solar radiation. Design and construction of glass walls have significant effects on building comfort and energy consumption. This paper describes methods of improving glass walls thermal...

  4. The problem of designing facades within an industrialized building system : a technical analysis for criticising and evaluating contemporary buildings

    E-Print Network [OSTI]

    Plante, Jacques

    1985-01-01

    Designing facades is one of the most important and delicate problems in contemporary architecture. The facade is the changing zone par excelience within which the structural elements of technology meld into refined details ...

  5. Design of an Overmoded-Waveguide Directional Antenna for Use in In-Building Ventilation Duct Wireless Networks

    E-Print Network [OSTI]

    Stancil, Daniel D.

    Design of an Overmoded-Waveguide Directional Antenna for Use in In-Building Ventilation Duct ventilation ducts. We obtain experimentally the element size and spacing of a reflector and driven element that can be used for IEEE 802.11b/g/n signals in a cylindrical duct to provide 3.1 dB of gain and a front

  6. 228 IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, VOL. 16, NO. 3, JUNE 2000 Design Lessons for Building Agile

    E-Print Network [OSTI]

    Merat, Francis L.

    228 IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, VOL. 16, NO. 3, JUNE 2000 Design Lessons for Building Agile Manufacturing Systems Wyatt S. Newman, Member, IEEE, Andy Podgurski, Member, IEEE, Roger D--Agile manufacturing, automated assembly, flex- ible automation, rapid-response manufacturing, robotic assembly

  7. Approved Module Information for CE1002, 2014/5 Module Title/Name: Design and Build Module Code: CE1002

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    Approved Module Information for CE1002, 2014/5 Module Title/Name: Design and Build Module Code: CE1002 School: Engineering and Applied Science Module Type: Standard Module New Module? No Module Credits: 10 Module Management Information Module Leader Name Paul Andrew Tack Email Address tackpa

  8. Archive Reference Buildings by Building Type: Primary school

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  9. Archive Reference Buildings by Building Type: Secondary school

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  10. Archive Reference Buildings by Building Type: Stand-alone retail

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  11. Archive Reference Buildings by Building Type: Fast food

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  12. Archive Reference Buildings by Building Type: Small office

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  13. Archive Reference Buildings by Building Type: Strip mall

    Broader source: Energy.gov [DOE]

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  14. Archive Reference Buildings by Building Type: Large office

    Office of Energy Efficiency and Renewable Energy (EERE)

    Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

  15. The need to design and construct roadways on highly plastic clays is common in central and eastern Texas, where expansive clays are prevalent. Roadways constructed on highly plastic clay subgrades may be damaged

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    The need to design and construct roadways on highly plastic clays is common in central and eastern Texas, where expansive clays are prevalent. Roadways constructed on highly plastic clay subgrades may the infiltration of water into highly plastic clays under an increased gravity field in a centrifuge. Project

  16. Visualizing historic buildings 

    E-Print Network [OSTI]

    Han, Kyu Yol

    1997-01-01

    and horizontal curved surfaces. Engineers and architects can also use animation software to visualize their products and architectural designs for presentations, or to simulate reality convincing in the animation of yet-to-be-constructed buildings. "Once... visualization tool. SoftImage's broad range of powerful and sophisticated animation tools allows the production of complex 3D spaces and animations of outstanding quality both quickly and easily. I intend to investigate selected objects with these two...

  17. Whole Building Efficiency for Whole Foods: Preprint

    SciTech Connect (OSTI)

    Deru, M.; Doebber, I.; Hirsch, A.

    2013-02-01

    The National Renewable Energy Laboratory partnered with Whole Foods Market under the Commercial Building Partnership (CBP) program to design and implement a new store in Raleigh, North Carolina. The result was a design with a predicted energy savings of 40% over ASHRAE Standard 90.1-2004, and 25% energy savings over their standard design. Measured performance of the as-built building showed that the building did not achieve the predicted performance. A detailed review of the project several months after opening revealed a series of several items in construction and controls items that were not implemented properly and were not fully corrected in the commissioning process.

  18. Advanced Design and Commissioning Tools for Energy-Efficient Building Technologies

    E-Print Network [OSTI]

    Bauman, Fred; Webster, Tom; Zhang, Hui; Arens, Ed

    2012-01-01

    2009, the goal of net zero energy was reached. Referenceswas to make it a net zero-energy building. We obtained

  19. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    SciTech Connect (OSTI)

    Dorr, Kent A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Freeman-Pollard, Jhivaun R. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  20. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    SciTech Connect (OSTI)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  1. Design and construction of a precision tubular linear motor and controller 

    E-Print Network [OSTI]

    Murphy, Bryan Craig

    2004-09-30

    A design for a novel tubular high-precision direct-drive brushless linear motor has been developed. The novelty of the design lies in the orientation of the magnets in the mover. In conventional linear motors the magnets of the armature...

  2. Design and construction of vertical axis wind turbines using dual-layer vacuum-forming

    E-Print Network [OSTI]

    Carper, Christopher T

    2010-01-01

    How does one visualize wind? Is it the way trees bend in a strong gust or the way smoke is carried in a breeze? What if wind could be visualized using design, technology, and light? This thesis documents the design of a ...

  3. Roof and Attic Design Guidelines for new and retrofit Construction of Homes in Hot and Coild Climates

    SciTech Connect (OSTI)

    Desjarlais, Andre Omer [ORNL] [ORNL; LaFrance, Marc [International Energy Agency] [International Energy Agency

    2013-01-01

    Some guidelines for improving the energy efficiency of roofs and attics are presented and are based on the research of the DOE Building Technology. The results of combined analytical and experimental studies were used to benchmark computer tools, which in turn, were used to simulate homes in hot and cold climates. Adding floor and roof insulation, above deck ventilation, radiant barriers, cool color shingle, metal or tile roofs, sealing the attic floor, sealing the duct system and sealing the attic were simulated to compute the cost of energy savings. Results are prioritized to help building owners make an informed economic decision when contemplating roof and attic retrofits. Sealing the attic floor is a top retrofit option. The sealed attic approach and a new prototype roof assembly an insulated and ventilated roof are good options for retrofit work but have paybacks ranging from 15 to 25 years. A new sealed attic concept was simulated and computations show its simple payback is about 10 to 12 years in hot and cold climates; its first cost is significantly reduced from that of a spray foam approach. For new construction the best option is to keep the ducts out of the attic, make sure the attic floor is sealed and add at least code level of insulation to the ceiling.

  4. The new Kaiserstuhl coking plant: The heating system -- Design, construction and initial operating experience

    SciTech Connect (OSTI)

    Strunk, J.

    1996-12-31

    At the end of 1992 the new coke plant Kaiserstuhl in Dortmund/Germany with presently the largest coke ovens world-wide started its production operation in close linkage to the Krupp-Hoesch Metallurgical Works after about 35 months construction time. This plant incorporating comprehensive equipment geared to improve environmental protection is also considered as the most modern coke plant of the world. The heating-system and first results of operation will be presented.

  5. Design and Construction Integration of a Continuous Precast Prestressed Concrete Bridge System 

    E-Print Network [OSTI]

    Roy, Subha Lakshmi 1982-

    2011-04-15

    An effective, viable design solution for the elevated viaduct guideway for Universal Freight Shuttle (UFS) system championed by Texas Transportation Institute (TTI) is presented. The proposed precast elevated UFS bridge system is analyzed...

  6. Measuring the value of workspace architectural design : construction of the Workspace Communication Suitability Index (WOCSIT)

    E-Print Network [OSTI]

    Tsakonas, Konstantinos Georgios

    2008-01-01

    The aim of this dissertation is to measure the impact of workspace architectural design on the value it generates for tenant organizations in terms of, without loss of generality, strengthening organizational identity and ...

  7. Z .Automation in Construction 10 2000 181197 www.elsevier.comrlocaterautcon

    E-Print Network [OSTI]

    Sacks, Rafael

    Z .Automation in Construction 10 2000 181­197 www.elsevier.comrlocaterautcon Structural design in an automated building system Rafael Sacks a,) , Abraham Warszawski b , Uri Kirsch c a Department Abstract Structural design of buildings has proven particularly difficult to automate. Parametric templates

  8. High Performance Buildings Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The High Performance Buildings Database is a shared resource for the building industry, a unique central repository of in-depth information and data on high-performance, green building projects across the United States and abroad. The database includes information on the energy use, environmental performance, design process, finances, and other aspects of each project. Members of the design and construction teams are listed, as are sources for additional information. In total, up to twelve screens of detailed information are provided for each project profile. Projects range in size from small single-family homes or tenant fit-outs within buildings to large commercial and institutional buildings and even entire campuses. The database is a data repository as well. A series of Web-based data-entry templates allows anyone to enter information about a building project into the database. Once a project has been submitted, each of the partner organizations can review the entry and choose whether or not to publish that particular project on its own Web site.

  9. Optimizing Architectural and Structural Aspects of Buildings towards Higher Energy Efficiency

    E-Print Network [OSTI]

    Hamadi, Yousseff

    Optimizing Architectural and Structural Aspects of Buildings towards Higher Energy Efficiency, intelligent building design, energy efficiency, construction costs, multi-objective optimization. 1 for the time being). But the more energy-efficient is the building, the more expensive tends to be its

  10. Optimizing Architectural and Structural Aspects of Buildings towards Higher Energy Efficiency

    E-Print Network [OSTI]

    Boyer, Edmond

    Optimizing Architectural and Structural Aspects of Buildings towards Higher Energy Efficiency, intelligent building design, energy efficiency, construction costs, multi-objective optimization. 1 for the optimization of buildings, in terms of sustainable development, is the reduction of energy use (while also

  11. Commercial Building Partners Catalyze High Performance Buildings Across the Nation

    SciTech Connect (OSTI)

    Baechler, Michael C.; Dillon, Heather E.; Bartlett, Rosemarie

    2012-08-01

    In 2008 the US Department of Energy (DOE) launched the Commercial Buildings Partnership (CBP) project to accelerate market adoption of commercially available energy saving technologies into the design process for new and upgraded commercial buildings. The CBP represents a unique collaboration between industry leaders and DOE to develop high performance buildings as a model for future construction and renovation. CBP was implemented in two stages. This paper focuses on lessons learned at Pacific Northwest National Laboratory (PNNL) in the first stage and discusses some partner insights from the second stage. In the first stage, PNNL and the National Renewable Energy Laboratory recruited CBP partners that own large portfolios of buildings. The labs provide assistance to the partners' design teams and make a business case for energy investments.

  12. Recommendations for the analysis and design of naturally ventilated buildings in urban areas

    E-Print Network [OSTI]

    Truong, Phan Hue

    2012-01-01

    The motivation behind this work was to obtain a better understanding of how a building's natural ventilation potential is affected by the complexities introduced by the urban environment. To this end, we have derived in ...

  13. BENEFITS OF RADIAL BUILD MINIMIZATION AND REQUIREMENTS IMPOSED ON ARIES COMPACT STELLARATOR DESIGN

    E-Print Network [OSTI]

    California at San Diego, University of

    savings in the radial build has been achieved, reducing the major radius by more than 20%, which. The primary goal of the study is to develop a more compact machine that retains the cost savings associated

  14. EnergyGauge USA: A Residential Building Energy Simulation Design Tool 

    E-Print Network [OSTI]

    Fairey, P.; Vieira, R. K.; Parker, D. S.; Hanson, B.; Broman, P. A.; Grant, J. B.; Fuehrlein, B.; Gu, L.

    2002-01-01

    The Florida Solar Energy Center (FSEC) has developed new software (EnergyGauge USA) which allows simple calculation and rating of energy use of residential buildings around the United States. In the past, most residential analysis and rating...

  15. PART III DIVISION 13 PAGE 1 RUTGERS DESIGN STANDARDS MANUAL NOV 2008 DIVISION 13 SPECIAL CONSTRUCTION

    E-Print Network [OSTI]

    operating condition. The system #12;PART III DIVISION 13 PAGE 2 RUTGERS DESIGN STANDARDS MANUAL NOV 2008 detail battery calculations per NFPA 72. 4. Indicate all A/C, fans, Dampers to be monitored by fire alarm detailed battery calculations per the

  16. Design and Construction of a Prototype Solenoid Coil for MICE Coupling Magnets

    SciTech Connect (OSTI)

    Wang, Li; Pan, Heng; Guo, XingLong; Xu, FengYu; Liu, XiaoKun; Wu, Hong; Zheng, ShiXian; Green, Michael A; Li, Derun; Virostek, Steve; Zisman, Michael

    2010-06-28

    A superconducting coupling solenoid mounted around four conventional RF cavities, which produces up to 2.6 T central magnetic field to keep the muons within the cavities, is to be used for the Muon Ionization Cooling Experiment (MICE). The coupling coil made from copper matrix NbTi conductors is the largest of three types of magnets in MICE both in terms of 1.5 m inner diameter and about 13MJ stored magnetic energy at full operation current of 210A. The stress induced inside the coil assembly during cool down and magnet charging is relatively high. In order to validate the design method and develop the coil winding technique with inside-wound SC splices required for the coupling coil, a prototype coil made from the same conductor and with the same diameter and thickness but only one-fourth long as the coupling coil was designed and fabricated by ICST. The prototype coil was designed to be charged to strain conditions that are equivalent or greater than would be encountered in the coupling coil. This paper presents detailed design of the prototype coil as well as developed coil winding skills. The analyses on stress in the coil assembly and quench process were carried out.

  17. Constructed Farm Wetlands (CFWs) designed for remediation of farmyard runoff: an

    E-Print Network [OSTI]

    of their water treatment efficiency, ecological value, costs and benefits Fabrice Gouriveau Submitted for society. Among other Best Management Practices implemented to address agricultural water pollution is therefore needed of their long-term water treatment efficiency and ecological value to optimize their design

  18. Guidelines for Building Science Education

    SciTech Connect (OSTI)

    Metzger, Cheryn E.; Rashkin, Samuel; Huelman, Pat

    2015-03-11

    The U.S. Department of Energy’s (DOE) residential research and demonstration program, Building America, has triumphed through 20 years of innovation. Partnering with researchers, builders, remodelers, and manufacturers to develop innovative processes like advanced framing and ventilation standards, Building America has proven an energy efficient design can be more cost effective, healthy, and durable than a standard house. As Building America partners continue to achieve their stretch goals, they have found that the barrier to true market transformation for high performance homes is the limited knowledge-base of the professionals working in the building industry. With dozens of professionals taking part in the design and execution of building and selling homes, each person should have basic building science knowledge relevant to their role, and an understanding of how various home components interface with each other. Instead, our industry typically experiences a fragmented approach to home building and design. After obtaining important input from stakeholders at the Building Science Education Kick-Off Meeting, DOE created a building science education strategy addressing education issues preventing the widespread adoption of high performance homes. This strategy targets the next generation and provides valuable guidance for the current workforce. The initiative includes: • Race to Zero Student Design Competition: Engages universities and provides students who will be the next generation of architects, engineers, construction managers and entrepreneurs with the necessary skills and experience they need to begin careers in clean energy and generate creative solutions to real world problems. • Building Science to Sales Translator: Simplifies building science into compelling sales language and tools to sell high performance homes to their customers. • Building Science Education Guidance: Brings together industry and academia to solve problems related to building science education. This report summarizes the steps DOE has taken to develop guidance for building science education and outlines a path forward towards creating real change for an industry in need. The Guidelines for Building Science Education outlined in Appendix A of this report have been developed for external stakeholders to use to certify that their programs are incorporating the most important aspects of building science at the most appropriate proficiency level for their role. The guidelines are intended to be used primarily by training organizations, universities, and certification bodies. Each guideline can be printed or saved as a stand-alone document for ease-of-use by the respective stakeholder group. In 2015, DOE, with leadership from Pacific Northwest National Laboratory (PNNL), is launching a multi-year campaign to promote the adoption of the Guidelines for Building Science Education in a variety of training settings.

  19. Builders Challenge High Performance Builder Spotlight - Martha Rose Construction, Inc., Seattle, Washington

    SciTech Connect (OSTI)

    2008-01-01

    Building America/Builders Challenge fact sheet on Martha Rose Construction, an energy-efficient home builder in marine climate using the German Passiv Haus design, improved insulation, and solar photovoltaics.

  20. Mainstreaming straw as a construction material : understanding the future of bio-based architectural materials

    E-Print Network [OSTI]

    Carbone, Christopher M. (Christopher Martin), 1975-

    2003-01-01

    There is a current trend in design and construction towards the use of distinct prefabricated components in the production of buildings. There is also a growing awareness by architects and builders of the environmental ...