Powered by Deep Web Technologies
Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

DOE - Office of Legacy Management -- Buffalo NY Site - NY 54  

NLE Websites -- All DOE Office Websites (Extended Search)

Buffalo NY Site - NY 54 Buffalo NY Site - NY 54 FUSRAP Considered Sites Buffalo, NY Alternate Name(s): Bliss & Laughlin Steel Company Niagara Cold Drawn Steel Corporation Ramco Steel Incorporated NY.54-1 NY.54-4 Location: 110 Hopkins Street, Buffalo, New York NY.54-1 Historical Operations: Machined and straightened uranium rods as subcontracted work from National Lead Company, an AEC contractor. NY.54-3 NY.54-4 LTSM012601 Eligibility Determination: Eligible NY.54-4 Radiological Survey(s): Assessment Surveys, Verification Surveys NY.54-6 NY.54-7 NY.54-8 LTSM012601 Site Status: Certified- Certification Basis and Certification Statement BLS000001 LTSM012152 LTSM012584 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP

2

Buffalo, NY Liquefied Natural Gas Exports to Canada (Dollars...  

U.S. Energy Information Administration (EIA) Indexed Site

Buffalo, NY Liquefied Natural Gas Exports to Canada (Dollars per Thousand Cubic Feet) Buffalo, NY Liquefied Natural Gas Exports to Canada (Dollars per Thousand Cubic Feet) Decade...

3

DOE - Office of Legacy Management -- Linde Air Products Div - Buffalo - NY  

Office of Legacy Management (LM)

Linde Air Products Div - Buffalo - Linde Air Products Div - Buffalo - NY 65 FUSRAP Considered Sites Site: LINDE AIR PRODUCTS DIV. BUFFALO (NY.65 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Linde Chandler Street Plant NY.65-1 Location: Buffalo , New York NY.65-1 Evaluation Year: 1987 NY.65-1 Site Operations: Developed and produced non-radioactive material for the Oak Ridge Gaseous Diffusion Plant under contract with the AEC. NY.65-2 Site Disposition: Eliminated - No indication that radioactive materials were used at the site NY.65-3 Radioactive Materials Handled: No NY.65-1 Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP

4

buffalo  

Office of Legacy Management (LM)

about the Buffalo, New York, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Location of the Buffalo, New York, Site and on the...

5

NY  

Office of Legacy Management (LM)

NY NY 17.8 Prepared by Oak Ridge Associated Universities Prepgred for Office of Operationaf Safety U.S. Department of Energy Ezrt /ur / POST REMEDIAL ACTION SURVEY PROPERTY OF MODERN LANDFILL, INC. FORMER LOOW SITE LEWISTON, NEW YORK J.D. BERGER R a d i o l o g l c a l S t t e A s s e s s r n e n t P r o g r a m M a n p o t a e r E d u c a t l o n , R e s e a r c h , a n d T r a l n i n g D l v i s l o n FINAL REPORT January 1982 POST REIEDIAT ACTION SURVBY PROPERTY OF }TODBRN I.AIIDPILL' INC. rONGB LOOTI SITE LEIIISTOI, NEI{ YORK Prepared for U.S. Department of Eaergy J . D . B e r g e r P r o j e c t S t a f f R.D. Coudra C.F. Rienke P.[. Frane C.F. 9legver [f.0. Eelton L.A. Young Prepered by Radiological Site Aseessuent Progrm Dlanpower Educatioor Researchr and Training Diviaion Oak Ridge Acaociated Univereitiea Oak Ridger Tenneggee 37830 FINAL REPORT January 1982 Thls report ls based on work performed under contract number DB-AC05-760RO0033 wlth

6

buffalo  

Office of Legacy Management (LM)

Buffalo, New Buffalo, New York, Site (formerly the Bliss & Laughlin Steel site) is located at 110 Hopkins Street in the southern portion of Buffalo, New York. The site consists of a single, approximately 129,600-square-foot building surrounded by approximately 161,460 square feet of grounds. Used for finishing steel products, the facility is currently owned by the Niagara LaSalle Corporation. In September and October of 1952, the Bliss & Laughlin Steel Company machined and straightened uranium rods under subcontract to National Lead of Ohio (NLO), who operated the Fernald Site in Ohio under contract to the U.S. Atomic Energy Commission (AEC). These activities at the Buffalo site generated 53 drums of uranium waste cuttings, which AEC shipped to the Lake Ontario Ordnance

7

Thermal sludge dryer demonstration: Bird Island Wastewater Treatment Plant, Buffalo, NY. Final report  

DOE Green Energy (OSTI)

The Buffalo Sewer Authority (BSA), in cooperation with the New York State Energy Research and Development Authority (Energy Authority), commissioned a demonstration of a full scale indirect disk-type sludge dryer at the Bird Island Wastewater Treatment Plant (BIWWTP). The purpose of the project was to determine the effects of the sludge dryer on the sludge incineration process at the facility. Sludge incineration is traditionally the most expensive, energy-intensive unit process involving solids handling at wastewater treatment plants; costs for incineration at the BIWWTP have averaged $2.4 million per year. In the conventional method of processing solids, a series of volume reduction measures, which usually includes thickening, digestion, and mechanical dewatering, is employed prior to incineration. Usually, a high level of moisture is still present within sewage sludge following mechanical dewatering. The sludge dryer system thermally dewaters wastewater sludge to approximately 26%, (and as high as 38%) dry solids content prior to incineration. The thermal dewatering system at the BIWWTP has demonstrated that it meets its design requirements. It has the potential to provide significant energy and other cost savings by allowing the BSA to change from an operation employing two incinerators to a single incinerator mode. While the long-term reliability of the thermal dewatering system has yet to be established, this project has demonstrated that installation of such a system in an existing treatment plant can provide the owner with significant operating cost savings.

NONE

1995-01-01T23:59:59.000Z

8

DOE - Office of Legacy Management -- The Carborundum Co Inc Buffalo Ave  

Office of Legacy Management (LM)

Buffalo Ave Buffalo Ave Plant - NY 31 FUSRAP Considered Sites Site: THE CARBORUNDUM CO., INC., BUFFALO AVE. PLANT (NY.31) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Carborundum Company NY.31-1 Location: Buffalo Avenue , Niagra Falls , New York NY.31-1 Evaluation Year: 1987 NY.31-1 Site Operations: Produced Zirconium and Hafnium; fabricated nuclear reactor fuel elements and conducted research and development with Plutonium. NY.31-1 Site Disposition: Eliminated - Operated under an AEC license NY.31-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Zirconium, Hafnium, Plutonium NY.31-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see

9

DOE - Office of Legacy Management -- Buflovak Co - NY 56  

Office of Legacy Management (LM)

Buflovak Co - NY 56 Buflovak Co - NY 56 FUSRAP Considered Sites Site: Buflovak Co. (NY.56 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1543 Fillmore Ave. , Buffalo , New York NY.56-1 Evaluation Year: 1991 NY.56-2 Site Operations: Research and testing with uranium raffinate. NY.56-1 Site Disposition: Eliminated - Possibility for contamination considered remote due to scope of tests conducted and indication of cleanup operations after tests NY.56-1 NY.56-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium Raffinate NY.56-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to Buflovak Co.

10

DOE - Office of Legacy Management -- Utica Street Warehouse - NY 0-23  

Office of Legacy Management (LM)

Street Warehouse - NY 0-23 Street Warehouse - NY 0-23 FUSRAP Considered Sites Site: UTICA STREET WAREHOUSE (NY.0-23) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 240 West Utica Street , Buffalo , New York NY.0-23-2 Evaluation Year: 1987 NY.0-23-1 Site Operations: Stored and rebarrelled uranium process residues from operations at Linde. NY.0-23-3 Site Disposition: Eliminated - Original building demolished. Current land use - Parking facility. Potential for residual radioactive contamination considered remote. NY.0-23-1 Radioactive Materials Handled: Yes NY.0-23-1 Primary Radioactive Materials Handled: Natural Uranium Process Residues NY.0-23-1 Radiological Survey(s): None Indicated NY.0-23-1 Site Status: Eliminated from consideration under FUSRAP NY.0-23-1

11

The buffalo wars  

E-Print Network (OSTI)

The wandering buffalo of Yellowstone National Park are the subject of a heated debate in the western United States. The animals carry a disease called brucellosis, which infects both buffalo and cattle and has economic ...

Nasr, Susan L

2006-01-01T23:59:59.000Z

12

Category:Syracuse, NY | Open Energy Information  

Open Energy Info (EERE)

Syracuse, NY Syracuse, NY Jump to: navigation, search Go Back to PV Economics By Location Media in category "Syracuse, NY" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Syracuse NY Consolidated Edison Co-NY Inc.png SVFullServiceRestauran... 70 KB SVQuickServiceRestaurant Syracuse NY Consolidated Edison Co-NY Inc.png SVQuickServiceRestaura... 70 KB SVHospital Syracuse NY Consolidated Edison Co-NY Inc.png SVHospital Syracuse NY... 66 KB SVLargeHotel Syracuse NY Consolidated Edison Co-NY Inc.png SVLargeHotel Syracuse ... 69 KB SVLargeOffice Syracuse NY Consolidated Edison Co-NY Inc.png SVLargeOffice Syracuse... 68 KB SVMediumOffice Syracuse NY Consolidated Edison Co-NY Inc.png SVMediumOffice Syracus... 67 KB SVMidriseApartment Syracuse NY Consolidated Edison Co-NY Inc.png

13

Category:Rochester, NY | Open Energy Information  

Open Energy Info (EERE)

Rochester, NY Rochester, NY Jump to: navigation, search Go Back to PV Economics By Location Media in category "Rochester, NY" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Rochester NY Consolidated Edison Co-NY Inc.png SVFullServiceRestauran... 70 KB SVQuickServiceRestaurant Rochester NY Consolidated Edison Co-NY Inc.png SVQuickServiceRestaura... 71 KB SVHospital Rochester NY Consolidated Edison Co-NY Inc.png SVHospital Rochester N... 65 KB SVLargeHotel Rochester NY Consolidated Edison Co-NY Inc.png SVLargeHotel Rochester... 69 KB SVLargeOffice Rochester NY Consolidated Edison Co-NY Inc.png SVLargeOffice Rocheste... 67 KB SVMediumOffice Rochester NY Consolidated Edison Co-NY Inc.png SVMediumOffice Rochest... 67 KB SVMidriseApartment Rochester NY Consolidated Edison Co-NY Inc.png

14

DOE - Office of Legacy Management -- New York, NY, Site - NY 61  

Office of Legacy Management (LM)

York, NY, Site - NY 61 York, NY, Site - NY 61 FUSRAP Considered Sites New York, NY Alternate Name(s): Baker and Williams Warehouses Ralph Ferrara Company Warehouses Ralph Ferrara, Inc. NY.61-2 Location: 513-519, 521-527, and 529-535 West 20th Street, New York, New York NY.61-3 Historical Operations: Received and stored uranium ores and concentrates for MED. NY.61-5 NY.61-6 NY.61-7 Eligibility Determination: Eligible NY.61-1 NY.61-2 Radiological Survey(s): Assessment Surveys, Verification Surveys NY.61-3 NY.61-4 NY.61-8 NY.61-9 NY.61-10 Site Status: Certified - Certification Basis, Federal Register Notice Included NY.61-11 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP Also see New York, New York, Site

15

DOE - Office of Legacy Management -- Niagara Falls Storage Site NY - NY 17  

Office of Legacy Management (LM)

Niagara Falls Storage Site NY - NY Niagara Falls Storage Site NY - NY 17 FUSRAP Considered Sites Niagara Falls Storage Site, NY Alternate Name(s): Lake Ontario Ordnance Works (LOOW) Niagara Falls Storage Site (NFSS) DOE-Niagara Falls Storage Site NY.17-1 NY.17-3 Location: Lewiston, New York NY.17-5 Historical Operations: Stored, shipped, and buried radioactive equipment and waste for MED and AEC containing uranium, radium, and thorium. Contains Interim Waste Containment Structure. NY.17-1 NY.17-2 NY.17-14 Eligibility Determination: Eligible NY.17-4 Radiological Survey(s): Assessment Surveys NY.17-3 NY.17-5 NY.17-6 NY.17-7 NY.17-8 NY.17-9 NY.17-10 NY.17-11 NY.17-12 NY.17-14 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NY.17-13 NY.17-14 NY.17-15 NY.17-16 USACE Website Long-term Care Requirements: To be determined upon completion.

16

ACIM-~ NY.49  

Office of Legacy Management (LM)

' ' h:. ,,, ,_" , ACIM-~ NY.49 .,. i MEMORANDUM TO: FILE DATE FE: __~-tt_c~7' e_-_~-~------- --------- "%Kf-- ---- ---i------- Current: ~~~~~~--------__---_______ xf yee, date contacted- IVPE OF OPERATION f- ------------- Research & Development 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process z Theoretical Studies Sample 84 Analysis 0 Production 0 Disposal/Storage a Facility Type 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Fat a Other ------------------ c] Prime 0 Other information (i.e., co 0 Subcontractor + fixed fee, unit price, 0 Purchase Order time & material, +x:) G-----------^-------------- . ~~~~-----____~-~----------~ Contract/Purchase Order # ---------------------------------

17

NY-%-3 P  

Office of Legacy Management (LM)

NY-%-3 NY-%-3 P m F P F ?- P m ?- c m P P CII (I pl F F- 3?r -J-J-. _- /, i ;. / 0 Aerospace Report No. ATR-82 (796344-2 i Aq, is y !i,' Evaluation of the 1943Hto# 1946 ilid Liquid Effluent Discharge From the Linde Air Products Company Ceramics Plant December 198 I Prepared for Office of Operational Safety Assistant Secretary for Environmental Protection, Safety, and Emergency Preparedness U.S. DEPARTMENT OF ENERGY Prepared by Environment and Conservation Directorate Eastern Technical Division THE AEROSPACE CORPORATION Germantown, Maryland Contract No. DE-ACOP-81EV10532 I- ,- A e r o s p a c e R e p o r t N o . A T R - 8 2 ( 7 9 6 3 - 0 4 ) - 2 E V A L U A T IO N O F T H E 1 9 4 3 - T O - 1 9 4 6 L IQ U ID E F F L U E N T D IS C H A R G E F R O M T H E L INDE A IR P R O D U C T S C O M P A N Y C E R A M ICS P L A N T D e c e m b e r 1 9 8 1 P r e p a r e d for O

18

DOE - Office of Legacy Management -- Guterl Specialty Steel - NY 12  

Office of Legacy Management (LM)

Guterl Specialty Steel - NY 12 Guterl Specialty Steel - NY 12 FUSRAP Considered Sites Guterl Specialty Steel, NY Alternate Name(s): Simonds Saw and Steel Co. Guterl Steel Allegheny Ludlum Steel Corp. NY.12-1 NY.12-2 Location: Ohio Street and Route 95, Lockport, New York NY.12-12 Historical Operations: Performed rolling mill operations on natural uranium and thorium metal. NY.12-6 NY.12-7 Eligibility Determination: NY.12-11 Radiological Survey(s): Assessment Surveys NY.12-1 NY.12-4 NY.12-8 NY.12-9 NY.12-12 Site Status: Cleanup pending by U.S. Army Corps of Engineers. NY.12-10 NY.12-11 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Guterl Specialty Steel, NY NY.12-1 - ORNL Letter; Cottrell to Turi; Radiological Survey of the

19

Buffalo Software | Open Energy Information  

Open Energy Info (EERE)

Software Software Jump to: navigation, search Logo: Buffalo Software Name Buffalo Software Place Broomfield Zip 80020 Country United States Sector Buildings Product Energy Databus Year founded 2009 Company Type For Profit Company Ownership Private Technology Buffalo Software offers services supporting the NREL Energy Databus including installation, feature development and support plans. Phone number 303-517-8902 Website http://buffalosw.com Region Rockies Area References Energy Databus[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Buffalo Software is a company based in Broomfield. References ↑ "Energy Databus" Retrieved from "http://en.openei.org/w/index.php?title=Buffalo_Software&oldid=651569"

20

DOE - Office of Legacy Management -- Colonie - NY 06  

NLE Websites -- All DOE Office Websites (Extended Search)

Considered Sites > Colonie - NY 06 Considered Sites > Colonie - NY 06 FUSRAP Considered Sites Colonie, NY Alternate Name(s): Colonie Interim Storage Site National Lead Industries NY.06-1 Location: 1130 Central Avenue, Colonie, New York NY.06-1 Historical Operations: Fabricated and processed uranium metal for the AEC, resulting in contamination from thorium and natural, enriched, and depleted uranium. NY.06-1 NY.06-4 NY.06-5 Eligibility Determination: Eligible NY.06-2 NY.06-3 Radiological Survey(s): Assessment Surveys, Verification Surveys NY.06-6 NY.06-7 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NY.06-8 NY.06-9 NY.06-10 NY.06-11 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Colonie, NY Colonie Site Aerial Photograph

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Grand Island, NY Natural Gas Imports by Pipeline from Canada  

Gasoline and Diesel Fuel Update (EIA)

GA Lake Charles, LA LNG Imports from Indonesia Lake Charles, LA LNG Imports from Malaysia Gulf Gateway, LA Lake Charles, LA LNG Imports from Nigeria Cove Point, MD Elba...

22

Grand Island, NY Natural Gas Pipeline Imports From Canada (Million...  

Annual Energy Outlook 2012 (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 42,832 42,302 44,981 33,140 2000's 49,012 95,639 110,417 76,421 66,612 92,474 80,907 88,886...

23

Western NY Energy LLC | Open Energy Information  

Open Energy Info (EERE)

search Name Western NY Energy LLC Place Mount Morris, New York Zip 14510 Product Bioethanol producer. References Western NY Energy LLC1 LinkedIn Connections CrunchBase...

24

DOE - Office of Legacy Management -- Niagara Falls Vicinity Properties NY -  

Office of Legacy Management (LM)

Niagara Falls Vicinity Properties Niagara Falls Vicinity Properties NY - NY 17 FUSRAP Considered Sites Niagara Falls Vicinity Properties, NY Alternate Name(s): Lake Ontario Ordnance Works (LOOW) Niagara Falls Storage Site (NFSS) DOE-Niagara Falls Storage Site NY.17-1 NY.17-3 Location: Lewiston , New York NY.17-5 Historical Operations: Stored, shipped, and buried radioactive equipment and waste for MED and AEC containing uranium, radium, and thorium. Portions of the former site are privately owned, creating a "site" for the vicinity properties. NY.17-1 NY.17-2 NY.17-14 Eligibility Determination: Eligible NY.17-4 Radiological Survey(s): Assessment Surveys, Verification Surveys NY.17-3 NY.17-5 NY.17-6 NY.17-7 NY.17-8 NY.17-9 NY.17-10 NY.17-11 NY.17-12 NY.17-14 Site Status: Certification Basis, including Federal Register Notice for 23 properties. Cleanup in progress for additional 3 VPs. NY.17-13

25

Sylvania Corporation, Hicksville, NY and Bayside, NY Addendum to July 8, 2004  

Energy.gov (U.S. Department of Energy (DOE))

Sylvania Corporation, Hicksville, NY and Bayside, NY Addendum to July 8, 2004, additional_sylvania.pdf memorandum Date: October 6, 2004 Reply to Attn of: Department of Energy Headquarters FOIA...

26

NY.O-20- I  

Office of Legacy Management (LM)

; I.-' ; I.-' NY.O-20- I ' 3% 3 MEMORANDUM TO: FILE FKOM: An&x?! w311E? SUHYECT: .Elimination of Pyroferric Co. New Yor SITE ALT NAME: EYE&XCLG f2!Y2~!2Y 621 E. 216th St. CITY: N__ew_ yw-r; STATE: N__V _ok!kEKm. Past: P_rrof_errrLc Go: current: Qwner contacted X yes no; if yes, date co Past owner2 IYE OE C)PEEux!N g Research et Develapment Faci - Production scale testing x M XX - Experimental tests U - Henoh.Scale Process R - Theoretical Studies Gove - Sample % Analysis 0 Production Disposal/Storage "t acted 1 1/10/G iz 17 -&49s300 move !d t li ari ty TYPO "i e+i "! "7 Prime Othe X Subcontractor Furcharje Order r: + fixed time 8: n k, Elr( NY NATE NI?IME: P_YD2fC Inter" Contract/Purchase Order # 33482 with AMF ----- ---- ---

27

DOE - Office of Legacy Management -- Syracuse University - NY 29  

Office of Legacy Management (LM)

Syracuse University - NY 29 Syracuse University - NY 29 FUSRAP Considered Sites Site: SYRACUSE UNIVERSITY (NY.29) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Syracuse , New York NY.29-1 Evaluation Year: 1994 NY.29-2 Site Operations: Activities included work with uranium oxide and the precipitation of thorium iodate from homogeneous solution. NY.29-1 NY.29-3 NY.29-4 Site Disposition: Eliminated - Potential for contamination remote NY.29-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium NY.29-3 NY.29-4 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to SYRACUSE UNIVERSITY NY.29-1 - AEC Memorandum; Belmore to Rodden; Request for Uranium

28

DOE - Office of Legacy Management -- Bethlehem Steel Corporation - NY 02  

Office of Legacy Management (LM)

Bethlehem Steel Corporation - NY 02 Bethlehem Steel Corporation - NY 02 FUSRAP Considered Sites Site: BETHLEHEM STEEL CORPORATION (NY.02 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Lackawanna , New York NY.02-1 Evaluation Year: 1985 NY.02-2 Site Operations: Conducted high temperature alpha-phase rolling tests on uranium metal in the 1950s. NY.02-3 Site Disposition: Eliminated - Radiation levels below criteria NY.02-5 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.02-3 Radiological Survey(s): Yes NY.02-4 NY.02-5 Site Status: Eliminated from consideration under FUSRAP NY.02-6 Also see Documents Related to BETHLEHEM STEEL CORPORATION NY.02-1 - Bethlehem Steel Corp. Letter; Subject: Completed Access

29

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings...

30

DOE - Office of Legacy Management -- Memorial Hospital - NY 0...  

Office of Legacy Management (LM)

Memorial Hospital - NY 0-16 FUSRAP Considered Sites Site: MEMORIAL HOSPITAL (NY.0-16 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name:...

31

Category:New York, NY | Open Energy Information  

Open Energy Info (EERE)

York, NY York, NY Jump to: navigation, search Go Back to PV Economics By Location Media in category "New York, NY" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant New York NY Consolidated Edison Co-NY Inc.png SVFullServiceRestauran... 70 KB SVQuickServiceRestaurant New York NY Consolidated Edison Co-NY Inc.png SVQuickServiceRestaura... 71 KB SVHospital New York NY Consolidated Edison Co-NY Inc.png SVHospital New York NY... 64 KB SVLargeHotel New York NY Consolidated Edison Co-NY Inc.png SVLargeHotel New York ... 68 KB SVLargeOffice New York NY Consolidated Edison Co-NY Inc.png SVLargeOffice New York... 67 KB SVMediumOffice New York NY Consolidated Edison Co-NY Inc.png SVMediumOffice New Yor... 67 KB SVMidriseApartment New York NY Consolidated Edison Co-NY Inc.png

32

Niagara Falls, NY Natural Gas Pipeline Exports to Canada (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Niagara Falls, NY Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Niagara Falls, NY Natural Gas Pipeline Exports...

33

Niagara Falls, NY Natural Gas Pipeline Imports From Canada (Million...  

Gasoline and Diesel Fuel Update (EIA)

View History: Monthly Annual Download Data (XLS File) Niagara Falls, NY Natural Gas Pipeline Imports From Canada (Million Cubic Feet) Niagara Falls, NY Natural Gas Pipeline...

34

DOE - Office of Legacy Management -- Columbia University - NY...  

Office of Legacy Management (LM)

NY.03-3 Site Operations: Early research and development -- nuclear chain reaction (fission) and gaseous diffusion during the 1940s. NY.03-4 Site Disposition: Eliminated -...

35

Massena, NY Natural Gas Pipeline Exports to Canada (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

View History: Monthly Annual Download Data (XLS File) Massena, NY Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Massena, NY Natural Gas Pipeline Exports to Canada...

36

Northeast - NY NJ CT PA Area | Open Energy Information  

Open Energy Info (EERE)

Northeast - NY NJ CT PA Area Northeast - NY NJ CT PA Area (Redirected from New York Area - NY NJ CT PA) Jump to: navigation, search Contents 1 Clean Energy Clusters in the Northeast - NY NJ CT PA Area 1.1 Products and Services in the Northeast - NY NJ CT PA Area 1.2 Research and Development Institutions in the Northeast - NY NJ CT PA Area 1.3 Networking Organizations in the Northeast - NY NJ CT PA Area 1.4 Investors and Financial Organizations in the Northeast - NY NJ CT PA Area 1.5 Policy Organizations in the Northeast - NY NJ CT PA Area Clean Energy Clusters in the Northeast - NY NJ CT PA Area Products and Services in the Northeast - NY NJ CT PA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

37

DOE - Office of Legacy Management -- Electromet Corporation - NY 04  

Office of Legacy Management (LM)

Electromet Corporation - NY 04 Electromet Corporation - NY 04 FUSRAP Considered Sites Site: Electromet Corporation (NY.04 ) Eliminated from consideration under FUSRAP - Referred to US EPA and New York State Designated Name: Not Designated Alternate Name: None Location: 4625 Royal Avenue , Niagara Falls , New York NY.04-1 Evaluation Year: 1985 NY.04-2 NY.04-3 Site Operations: Cast zirconium sponge into ingots in the 1950s. NY.04-4 Site Disposition: Eliminated - No Authority NY.04-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Zirconium NY.04-4 Radiological Survey(s): Yes NY.04-6 Site Status: Eliminated from consideration under FUSRAP - Referred to US EPA and New York State NY.04-2 Also see Documents Related to Electromet Corporation

38

DOE - Office of Legacy Management -- Hooker Chemical Co - NY 05  

Office of Legacy Management (LM)

Hooker Chemical Co - NY 05 Hooker Chemical Co - NY 05 FUSRAP Considered Sites Site: Hooker Chemical Co. (NY.05) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Occidental Chemical Corporation Hooker Electrochemical Corporation NY.05-1 NY.05-2 Location: Niagara Falls , New York NY.05-3 Evaluation Year: 1985 NY.05-1 NY.05-2 Site Operations: Design, engineering, construction, equipping and operation of a plant for the manufacture of Product 45 (xylene hexachloride); MFL (Miller's fluorolubricant); P-45Cl; and recovered P-45Cl2 from residues produced in the manufacture of P-45Cl; used hydrochloric acid (a byproduct of the P-45 Program) in the chemical processing of uranium-bearing slag as a precursor to recovery. NY.05-2 NY.05-4 Site Disposition: Eliminated - Radiation levels below criteria NY.05-1

39

DOE - Office of Legacy Management -- New York University - NY 50  

Office of Legacy Management (LM)

University - NY 50 University - NY 50 FUSRAP Considered Sites Site: NEW YORK UNIVERSITY (NY.50) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.50-1 Evaluation Year: 1987 NY.50-1 Site Operations: Activities were related to equipment development. Counters and a small quantity of uranium oxide were provided by the AEC for work under contract AT(30-1)-1256. NY.50-2 NY.50-3 NY.50-4 NY.50-1 Site Disposition: Eliminated - Potential for contamination considered remote - Limited quantity of radioactive material used at this site NY.50-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.50-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP

40

DOE - Office of Legacy Management -- Gleason Works - NY 55  

Office of Legacy Management (LM)

Gleason Works - NY 55 Gleason Works - NY 55 FUSRAP Considered Sites Site: GLEASON WORKS (NY.55 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Rochester , New York NY.55-1 Evaluation Year: 1994 NY.55-2 Site Operations: Metal fabrication operations - Rolled uranium metal. NY.55-1 Site Disposition: Eliminated - Potential for contamination considered remote NY.55-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.55-1 Radiological Survey(s): Health and Safety Monitoring NY.55-1 NY.55-3 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to GLEASON WORKS NY.55-1 - NLO Report; Klein to Quigley; Trip Report to the Gleason Works, Rochester, New York on October 30 Thru November 10, 1961; December

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Buffalo, Indiana: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Edit with form History Share this page on Facebook icon Twitter icon Buffalo, Indiana: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates...

42

Upstate NY Power Corp | Open Energy Information  

Open Energy Info (EERE)

energy Product Developer of clean energy projects in New York State, including wind and transmission assets. References Upstate NY Power Corp1 LinkedIn Connections CrunchBase...

43

DOE - Office of Legacy Management -- Rensslaer Polytechnic Institute - NY  

Office of Legacy Management (LM)

Rensslaer Polytechnic Institute - Rensslaer Polytechnic Institute - NY 18 FUSRAP Considered Sites Site: RENSSLAER POLYTECHNIC INSTITUTE (NY.18 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Troy , New York NY.18-1 Evaluation Year: 1987 NY.18-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment - under AEC license. NY.18-1 Site Disposition: Eliminated - Potential for residual contamination considered remote NY.18-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Not Specified NY.18-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to RENSSLAER POLYTECHNIC INSTITUTE

44

Northeast - NY NJ CT PA Area | Open Energy Information  

Open Energy Info (EERE)

Northeast - NY NJ CT PA Area Northeast - NY NJ CT PA Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Northeast - NY NJ CT PA Area 1.1 Products and Services in the Northeast - NY NJ CT PA Area 1.2 Research and Development Institutions in the Northeast - NY NJ CT PA Area 1.3 Networking Organizations in the Northeast - NY NJ CT PA Area 1.4 Investors and Financial Organizations in the Northeast - NY NJ CT PA Area 1.5 Policy Organizations in the Northeast - NY NJ CT PA Area Clean Energy Clusters in the Northeast - NY NJ CT PA Area Products and Services in the Northeast - NY NJ CT PA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

45

DOE - Office of Legacy Management -- National Carbon Co - NY 48  

Office of Legacy Management (LM)

Carbon Co - NY 48 Carbon Co - NY 48 FUSRAP Considered Sites Site: NATIONAL CARBON CO (NY.48) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.48-1 Evaluation Year: 1987 NY.48-2 Site Operations: Produced graphite for the MED/AEC. NY.48-1 NY.48-2 NY.48-3 Site Disposition: Eliminated - Potential for residual radioactive contamination considered remote - No indication that radioactive material was used on the site NY.48-2 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to NATIONAL CARBON CO NY.48-1 - AEC Letter; Crenshaw to National Carbon Company (Attn.:

46

DOE - Office of Legacy Management -- Seneca Army Depot - NY 11  

NLE Websites -- All DOE Office Websites (Extended Search)

Seneca Army Depot - NY 11 Seneca Army Depot - NY 11 FUSRAP Considered Sites Site: SENECA ARMY DEPOT (NY.11 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Romulus , New York Evaluation Year: 1985 NY.11-2 NY.11-3 Site Operations: Eleven bunkers were used to store approximately 2,000 drums of pitchblende ore in the early 1940's. The bunkers were returned to munitions storage service after removal of the ore drums. NY.11-4 Site Disposition: Eliminated - Referred to The Department of the Army NY.11-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Pitchblende Ore NY.11-3 Radiological Survey(s): Yes NY.11-5 Site Status: Eliminated from consideration under FUSRAP NY.11-2 Also see Documents Related to SENECA ARMY DEPOT

47

DOE - Office of Legacy Management -- Radiation Applications Inc - NY 57  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Applications Inc - NY 57 Radiation Applications Inc - NY 57 FUSRAP Considered Sites Site: RADIATION APPLICATIONS, INC. ( NY.57 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: RAI NY.57-1 Location: 370 Lexington Avenue , New York , New York NY.57-3 Evaluation Year: 1991 NY.57-4 Site Operations: Developed foam separation techniques and proposed investigations to remove cesium and strontium from fission product waste solutions. No indication that a substantial quantity of radioactive material was involved. NY.57-3 NY.57-5 Site Disposition: Eliminated - Potential for contamination considered remote NY.57-4 Radioactive Materials Handled: None Indicated NY.57-1 Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated

48

DOE - Office of Legacy Management -- Love Canal - NY 24  

Office of Legacy Management (LM)

Love Canal - NY 24 Love Canal - NY 24 FUSRAP Considered Sites Site: LOVE CANAL (NY.24 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None NY.24-1 Location: Region running from Old Military Road from the 16-acre rectangular piece of land in the southeast corner of Niagara Falls into the Township of Lewiston , Niagara Falls , New York NY.24-3 Evaluation Year: 1987 NY.24-1 Site Operations: Chemical storage and disposal. NY.24-1 NY.24-3 Site Disposition: Eliminated - No residual radioactive material found NY.24-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): Yes NY.24-5 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to LOVE CANAL

49

DOE - Office of Legacy Management -- Markite Co - NY 49  

Office of Legacy Management (LM)

Markite Co - NY 49 Markite Co - NY 49 FUSRAP Considered Sites Site: MARKITE CO. (NY.49 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 155 Waverly Place , New York , New York NY.49-1 Evaluation Year: 1987 NY.49-2 Site Operations: Conducted experiments with very small amounts of uranium and thorium. NY.49-2 Site Disposition: Eliminated - Handled limited amounts of radioactive materials - Potential for contamination remote NY.49-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium NY.49-2 NY.49-3 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to MARKITE CO. NY.49-1 - AEC Memorandum; Morgan to Youngs; Accountability at

50

US MidAtl NY Site Consumption  

Gasoline and Diesel Fuel Update (EIA)

MidAtl NY MidAtl NY Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 US MidAtl NY Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 2,000 4,000 6,000 8,000 10,000 12,000 US MidAtl NY Site Consumption kilowatthours $0 $250 $500 $750 $1,000 $1,250 $1,500 US MidAtl NY Expenditures dollars ELECTRICITY ONLY average per household * New York households consume an average of 103 million Btu per year, 15% more than the U.S. average. * Electricity consumption in New York homes is much lower than the U.S. average, because many households use other fuels for major energy end uses like space heating, water heating, and cooking. Electricity costs are closer to the national average due to higher than average electricity prices in the state.

51

US MidAtl NY Site Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

MidAtl NY MidAtl NY Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 US MidAtl NY Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 2,000 4,000 6,000 8,000 10,000 12,000 US MidAtl NY Site Consumption kilowatthours $0 $250 $500 $750 $1,000 $1,250 $1,500 US MidAtl NY Expenditures dollars ELECTRICITY ONLY average per household * New York households consume an average of 103 million Btu per year, 15% more than the U.S. average. * Electricity consumption in New York homes is much lower than the U.S. average, because many households use other fuels for major energy end uses like space heating, water heating, and cooking. Electricity costs are closer to the national average due to higher than average electricity prices in the state.

52

DOE - Office of Legacy Management -- Ledoux and Co - NY 37  

NLE Websites -- All DOE Office Websites (Extended Search)

Ledoux and Co - NY 37 Ledoux and Co - NY 37 FUSRAP Considered Sites Site: LEDOUX AND CO. (NY.37 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 155 Avenue of the Americas , New York , New York NY.37-1 Evaluation Year: 1987 NY.37-1 Site Operations: Prime contractor to AEC, African Metals. LeDoux handled radioactive materials under this contract at other locations; records indicate that radioactive materials were not sent to the New York office. NY.37-1 Site Disposition: Eliminated - Potential for contamination considered remote - Radioactive materials were not handled NY.37-2 NY.37-3 Radioactive Materials Handled: No NY.37-2 Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated

53

DOE - Office of Legacy Management -- Polytechnic Institute of Brooklyn - NY  

Office of Legacy Management (LM)

Polytechnic Institute of Brooklyn - Polytechnic Institute of Brooklyn - NY 0-19 FUSRAP Considered Sites Site: NY.0-19 (POLYTECHNIC INSTITUTE OF BROOKLYN) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.0-19-1 Evaluation Year: 1987 NY.0-19-1 Site Operations: Research and development involving only small quantities of radiological material in a controlled environment. NY.0-19-1 Site Disposition: Eliminated - Potential for contamination remote NY.0-19-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Not specified NY.0-19-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to NY.0-19 NY.0-19-1 - Aerospace Letter; Young to Wallo; Subject: Elimination

54

DOE - Office of Legacy Management -- Sylvania Corning Plant - NY 19  

Office of Legacy Management (LM)

Plant - NY 19 Plant - NY 19 FUSRAP Considered Sites Sylvania-Corning, NY Alternate Name(s): Sylvania Electric Products, Inc. Sylvania Corp. NY.19-1 NY.19-4 Location: Cantiaque Road, Hicksville, Long Island, New York NY.19-5 Historical Operations: Pilot-scale production of powdered metal uranium slugs for AEC's Hanford reactor. NY.19-4 Eligibility Determination: Eligible Radiological Survey(s): Assessment Survey NY.19-3 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Sylvania-Corning, NY Historical documents may contain links which are no longer valid or to outside sources. LM can not attest to the accuracy of information provided by these links. Please see the Leaving LM Website page for more details.

55

DOE - Office of Legacy Management -- Staten Island Warehouse - NY 22  

Office of Legacy Management (LM)

Staten Island Warehouse - NY 22 Staten Island Warehouse - NY 22 FUSRAP Considered Sites Staten Island Warehouse, NY Alternate Name(s): Archer-Daniels Midland Company NY.22-3 Location: 2393 Richmond Terrace, Port Richmond, New York NY.22-2 Historical Operations: Stored pitchblende (high-grade uranium ore), which was purchased by the MED for the first atomic bomb. NY.22-3 Eligibility Determination: Eligible Radiological Survey(s): Assessment Survey NY.22-5 Site Status: Referred by DOE, evaluation in progess by U.S. Army Corps of Engineers. USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Staten Island Warehouse, NY NY.22-1 - MED Trip Report Summary; Authors: Ruhoff (Corps of Engineers) and Geddes (Stone & Webster); Subject: Trip to New York;

56

DOE - Office of Legacy Management -- American Railway Express Office - NY  

Office of Legacy Management (LM)

Railway Express Office - Railway Express Office - NY 0-03 FUSRAP Considered Sites Site: American Railway Express Office (NY.0-03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: American Railway Express (Downtown) , New York , New York NY.0-03-1 Evaluation Year: 1987 NY.0-03-1 Site Operations: None - Involved with a fire during transport of uranium scrap. NY.0-03-2 Site Disposition: Eliminated - Potential for contamination remote NY.0-03-1 NY.0-03-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium scrap NY.0-03-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP NY.0-03-1 Also see Documents Related to American Railway Express Office

57

Microsoft Word - NY.17-16.doc  

Office of Legacy Management (LM)

Printed with soy ink on recycled paper Printed with soy ink on recycled paper Department of Energy Washington, DC 20585 Ms. Judith Leithner Project Manager, Buffalo District U.S. Army Corps of Engineers Department of the Army 1776 Niagara Street Buffalo, New York 14207-3199 Dear Ms. Leithner: This is in reference to the Niagara Falls Storage Site (NFSS) Vicinity Properties E', E, and G located in Lewiston, New York. In accordance with the terms of the March 1999 Memorandum of Understanding (MOU) between the Department of Energy (DOE) and the U.S. Army Corps of Engineers (U.S. ACE), DOE is in the process of completing closure documentation for several sites remediated by DOE prior to assignment of the Formerly Utilized Sites Remedial Action Program (FUSRAP) to the U.S. ACE. Under contract to the U.S. ACE (U.S. ACE Contract

58

DOE - Office of Legacy Management -- Sacandaga - NY 51  

Office of Legacy Management (LM)

New York NY.51-1 Evaluation Year: 1992 NY.51-2 Site Operations: Plant operated by General Electric during period spanning 1947 to 1951. Facilities housed studies involving radar,...

59

Grand Unified Theory  

NLE Websites -- All DOE Office Websites (Extended Search)

Grand Unified Theory Ungelste Rtsel Grand Unified Theory Heute besteht eines der Hauptziele der Teilchenphysik darin, die verschiedenen fundamentalen Krfte in einer Grossen...

60

Information summary, Area of Concern: Buffalo River, New York. Final report  

SciTech Connect

The Great Lakes National Program Office (GLNPO) is carrying out a 5-year study and demonstration project, Assessment and Remediation of Contaminated Sediments (ARCS), with emphasis on removal of toxic pollutants from bottom sediments. Information from the ARCS program is to be used to guide development of Remedial Action Plans for 42 identified Great Lakes Areas of Concern (AOCs). The AOCs are areas where serious impairment of beneficial uses of water or biota (drinking, swimming, fishing, navigation, etc.) is known to exist, or where environmental quality criteria are exceeded to the point that such impairment is likely. Priority consideration was given to five AOCs, including Buffalo River, N.Y. The WES Environmental Lab. reviewed existing data and information for each of these five AOCs. The approach used was to bring together WES scientists who have been conducting research on aspects of contaminant mobility in the aquatic environment to develop a list of information required to evaluate the potential for contaminant mobility. This report summarizes the information obtained for the Buffalo River. Topics include: Fish tissue concentrations, Groundwater, Land use, Metal contamination, Pesticides, Point and nonpoint source discharges, Risk assessment, Spills, Toxicity bioassay, and Water quality.

Lee, C.R.; Brandon, D.L.; Simmers, J.W.; Tatem, H.E.; Skogerbee, J.G.

1991-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Buffalo Ridge Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Ridge Wind Farm Ridge Wind Farm Jump to: navigation, search Name Buffalo Ridge Wind Farm Facility Buffalo Ridge Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Kenetech Windpower Energy Purchaser Xcel Energy Location Buffalo Ridge MN Coordinates 44.0039°, -96.0526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.0039,"lon":-96.0526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

62

DOE - Office of Legacy Management -- Linde Air Products Division - NY 08  

NLE Websites -- All DOE Office Websites (Extended Search)

Division - NY 08 Division - NY 08 FUSRAP Considered Sites Linde Air Products Division - Towanda, NY Alternate Name(s): Praxair Linde Aire Products Div. of Union Carbide Corp. Linde Ceramics Plant Uranium Refinery, Linde Site NY.08-4 Location: East Park Drive and Woodward, Tonawanda, New York NY.08-5 Historical Operations: Processed uranium compounds for MED and AEC. Includes Towanda Landfill as a VP. NY.08-1 NY.08-2 Eligibility Determination: Eligible NY.08-9 Radiological Survey(s): Assessment Surveys NY.08-3 NY.08-5 NY.08-6 NY.08-7 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NY.08-8 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Linde FUSRAP Site Documents Related to Linde Air Products Division - Towanda, NY

63

,"Massena, NY Natural Gas Pipeline Imports From Canada (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Massena, NY Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2012 ,"Release Date:","172014" ,"Next...

64

,"Champlain, NY Natural Gas Pipeline Imports From Canada (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Champlain, NY Natural Gas Pipeline Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest...

65

,"Waddington, NY Natural Gas Pipeline Imports From Canada (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Waddington, NY Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2012 ,"Release Date:","172014" ,"Next...

66

NlZWYORK4,N.Y.  

Office of Legacy Management (LM)

AFRICAN .METALS~ C~RPO~~XON AFRICAN .METALS~ C~RPO~~XON 41 BROAD STREET . i. ,,J iI: : LE OCT 2 2 1945 NlZWYORK4,N.Y. :October 5, 1945. Af-2-a L.: I.__: '../ . ._ The Area Engineer, U.S. Engineer Office, P.O. BOX 42, Station F., New York 16, N.Y. Gentlemen: Contract W-7405 eng-4. Reference is made to your letter EIDM A-33 MS of August 27th, 1945. Contract W-7405 eng-4 called for the delivery of 100 T of M-31, the M308 content of which was sold to you, whereas we reserved all rights to the R-l contained therein. We hereby certify that the liability of the Gouvernment in connection with the M308 contained--has .3*,., been completely fulfilled, and that the R-l%ontained has been returned to us in accordance with separate contract entered into between this Corporation and the Eldorado

67

EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties,...

68

Property:EIA/861/IsoNy | Open Energy Information  

Open Energy Info (EERE)

IsoNy IsoNy Jump to: navigation, search Property Name ISO_NY Property Type Boolean Description Indicates that the organization conducts operations in the NY ISO region [1] References ↑ "EIA Form EIA-861 Final Data File for 2010 - 861 Webfile Layout for 2010.doc" Pages using the property "EIA/861/IsoNy" Showing 25 pages using this property. (previous 25) (next 25) A AES Eastern Energy LP + true + AP Holdings LLC + true + Agway Energy Services, LLC + true + B Bath Electric Gas & Water Sys + true + Bluerock Energy, Inc. + true + C Central Hudson Gas & Elec Corp + true + City of Salamanca, New York (Utility Company) + true + City of Sherrill, New York (Utility Company) + true + City of Watertown, New York (Utility Company) + true +

69

Northern Westchester Energy Action Consortium (NY) | Open Energy  

Open Energy Info (EERE)

Energy Action Consortium (NY) Energy Action Consortium (NY) Jump to: navigation, search Logo: Northern Westchester Energy Action Consortium (NY) Name Northern Westchester Energy Action Consortium (NY) Address PO Box 681 Place Somers, New York Zip 10589 Region Northeast - NY NJ CT PA Area Year founded 2009 Website http://www.nweac.org Coordinates 41.3278772°, -73.6948234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.3278772,"lon":-73.6948234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

70

DOE - Office of Legacy Management -- Naval Supply Depot AEC Warehouse - NY  

Office of Legacy Management (LM)

Supply Depot AEC Warehouse - Supply Depot AEC Warehouse - NY 36 FUSRAP Considered Sites Site: NAVAL SUPPLY DEPOT, AEC WAREHOUSE (NY.36) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Building 546 , Scotia , New York NY.36-1 Evaluation Year: 1987 NY.36-1 Site Operations: This facility served as a storage and transshipment point for feed materials between the Hanford and commercial metal fabricators in the northeastern states. NY.36-1 NY.36-2 NY.36-3 Site Disposition: Eliminated - Referred to DOD NY.36-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium Metals NY.36-1 NY.36-2 NY.36-3 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD NY.36-1

71

Clean Cities: Clean Communities of Western New York (Buffalo...  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

for use with NGV's throughout the Northeastern USA. Mr. Jackson holds a Bachelor of Science in Mechanical Engineering from the University at Buffalo and a Master of Business...

72

Compound and Elemental Analysis At Buffalo Valley Hot Springs...  

Open Energy Info (EERE)

for geothermal development. These samples are being collected to support more detailed work and assessment at those sites. (e.g., Buffalo Valley and Rawhide-Fairview Peak)....

73

Buffalo Gap, South Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Edit with form History Share this page on Facebook icon Twitter icon Buffalo Gap, South Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia...

74

North Buffalo, South Dakota: Energy Resources | Open Energy Informatio...  

Open Energy Info (EERE)

Edit with form History Share this page on Facebook icon Twitter icon North Buffalo, South Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia...

75

Southeast Buffalo, South Dakota: Energy Resources | Open Energy...  

Open Energy Info (EERE)

with form History Share this page on Facebook icon Twitter icon Southeast Buffalo, South Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia...

76

Buffalo, South Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Page Edit with form History Share this page on Facebook icon Twitter icon Buffalo, South Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia...

77

DOE - Office of Legacy Management -- Tonawanda North Units 1 and 2 - NY 10  

NLE Websites -- All DOE Office Websites (Extended Search)

Tonawanda North Units 1 and 2 - NY Tonawanda North Units 1 and 2 - NY 10 FUSRAP Considered Sites Tonawanda North, NY, Units 1 and 2 Alternate Name(s): Ashland #1 and Ashland #2 Haist Property Seaway Area D Rattlesnake Creek NY.10-1 Location: State Highway 266, east of Interstate Highway 190, Tonawanda, NY NY.10-4 Historical Operations: Served as a repository for refined uranium and vanadium residues containing thorium and radium, generated by Linde Air Products. NY.10-4 NY.10-5 NY.10-6 NY.10-7 NY.10-9 Eligibility Determination: Eligible NY.10-1 NY.10-2 NY.10-3 Radiological Survey(s): Assessment Survey NY.10-4 Site Status: Certified - Certification Basis, Declaration of Completion Included NY.10-11 NY.10-13 NY.10-14 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP

78

Buffalo Gap Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Gap Wind Farm Gap Wind Farm Jump to: navigation, search Name Buffalo Gap Wind Farm Facility Buffalo Gap Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner AES Developer AES Energy Purchaser Direct Energy Location TX Coordinates 32.310556°, -100.149167° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.310556,"lon":-100.149167,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

79

Buffalo Bear Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Buffalo Bear Wind Farm Facility Buffalo Bear Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Edison Mission Group Developer Edison Mission Group Energy Purchaser Western Farmers Electric Coop Location OK Coordinates 36.573681°, -99.573275° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.573681,"lon":-99.573275,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

80

DOE - Office of Legacy Management -- Radium Chemical Co Inc - NY 60  

NLE Websites -- All DOE Office Websites (Extended Search)

Radium Chemical Co Inc - NY 60 Radium Chemical Co Inc - NY 60 FUSRAP Considered Sites Site: RADIUM CHEMICAL CO., INC (NY.60 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.60-1 Evaluation Year: 1987 NY.60-1 Site Operations: Commercial Producer of Radium. NY.60-1 Site Disposition: Eliminated - Commercial site - EPA cleanup project NY.60-1 Radioactive Materials Handled: Yes NY.60-1 Primary Radioactive Materials Handled: Radium NY.60-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to RADIUM CHEMICAL CO., INC NY.60-1 - Memorandum; A. Wallo to the File; Subject: FUSRAP review and elimination of the Radium Chemical Co. site in New York, NY; November

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DOE - Office of Legacy Management -- Simmons Machine and Tool Inc - NY 35  

NLE Websites -- All DOE Office Websites (Extended Search)

Simmons Machine and Tool Inc - NY Simmons Machine and Tool Inc - NY 35 FUSRAP Considered Sites Site: SIMMONS MACHINE AND TOOL, INC (NY.35) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1000 North Broadway , Albany , New York NY.35-1 Evaluation Year: 1987 NY.35-2 Site Operations: Tested equipment and machined uranium to test the equipment (one time event). NY.35-1 NY.35-2 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope and duration of activity performed at the site NY.35-2 NY.35-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.35-1 NY.35-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP

82

DOE - Office of Legacy Management -- Eastman Kodak Laboratory - NY 0-09  

Office of Legacy Management (LM)

Eastman Kodak Laboratory - NY 0-09 Eastman Kodak Laboratory - NY 0-09 FUSRAP Considered Sites Site: Eastman Kodak Laboratory (NY.0-09 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Eastman Kodak Rochester Lab NY.0-09-1 Location: Rochester , New York NY.0-09-1 Evaluation Year: 1987 NY.0-09-1 NY.0-09-2 Site Operations: Research and development with natural uranium solutions in 1943. NY.0-09-1 Site Disposition: Eliminated - Potential for contamination remote NY.0-09-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.0-09-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Eastman Kodak Laboratory NY.0-09-1 - Memorandum/Checklist; Wallo to the File; Subject:

83

DOE - Office of Legacy Management -- ACF Industries Inc - NY...  

Office of Legacy Management (LM)

Subject: Support of Findings and Determination - ACF Production Contract; February 15, 1954 NY.13-3 - AEC Letter; Donnelly to Pittman; Subject: Contaminated Ex-AEC-Owned or Leased...

84

Los Alamos technology to be featured on CSI: NY  

NLE Websites -- All DOE Office Websites (Extended Search)

device developed at Los Alamos National Laboratory will be used in an episode of Crime Scene Investigation-New York (CSI: NY) scheduled to air at 9 p.m. Mountain Daylight...

85

Yi-Jen Chiang Polytechnic University, NY, USA  

E-Print Network (OSTI)

Yi-Jen Chiang Xiang Lu Polytechnic University, NY, USA (appeared in Eurographics, Sept. 2003) #12] does not capture genus-change-only events) 1. Classify all vertices as critical / non-critical [Chiang

Chiang, Yi-Jen

86

RenewableNY - An Industrial Energy Conservation Initiative  

SciTech Connect

The New York Industrial Retention Network (NYIRN) manages the RenewableNY program to assist industrial companies in New York City to implement energy efficiency projects. RenewableNY provides companies with project management assistance and grants to identify opportunities for energy savings and implement energy efficiency projects. The program helps companies identify energy efficient projects, complete an energy audit, and connect with energy contractors who install renewable energy and energy efficient equipment. It also provides grants to help cover the costs of installation for new systems and equipment. RenewableNY demonstrates that a small grant program that also provides project management assistance can incentivize companies to implement energy efficiency projects that might otherwise be avoided. Estimated savings through RenewableNY include 324,500 kWh saved through efficiency installations, 158 kW of solar energy systems installed, and 945 thm of gas avoided.

Lubarr, Tzipora

2009-09-30T23:59:59.000Z

87

Niagara Falls, NY Natural Gas Pipeline Imports From Canada ...  

U.S. Energy Information Administration (EIA)

Niagara Falls, NY Natural Gas Pipeline Imports From Canada (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec; 2011: 9,497: 6,894: 4,421: 2,459 ...

88

DOE - Office of Legacy Management -- American Machine and Foundry Co - NY  

NLE Websites -- All DOE Office Websites (Extended Search)

Machine and Foundry Co - Machine and Foundry Co - NY 26 FUSRAP Considered Sites Site: American Machine and Foundry Co ( NY.26 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Lutheran Medical Center NY.26-1 Location: Second Avenue and 56th Street , Brooklyn , New York NY.26-2 Evaluation Year: 1992 NY.26-1 Site Operations: 1951 - 1954 conducted metal fabrication operation on uranium and thorium metals. NY.26-3 NY.26-4 Site Disposition: Eliminated - Potential for contamination considered remote based on results of radiological monitoring and sampling and extensive renovation of the site NY.26-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium and Thorium metal NY.26-1 Radiological Survey(s): Yes NY.26-5

89

DOE - Office of Legacy Management -- Allegheny-Ludlum Steel Corp - NY 0-02  

Office of Legacy Management (LM)

Allegheny-Ludlum Steel Corp - NY Allegheny-Ludlum Steel Corp - NY 0-02 FUSRAP Considered Sites Site: ALLEGHENY-LUDLUM STEEL CORP. (NY.0-02 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Al-Tech Specialty Steel NY.0-02-1 Location: Watervliet and Dunkirk , New York NY.0-02-1 Evaluation Year: 1985 NY.0-02-2 Site Operations: Processed uranium metal for the AEC in the early 1950s; rolled uranium billets into rods. NY.0-02-3 Site Disposition: Eliminated - Potential for contamination remote - Confirmed by radiological survey NY.0-02-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium Metal NY.0-02-3 Radiological Survey(s): Yes NY.0-02-4 Site Status: Eliminated from consideration under FUSRAP Also see

90

DOE - Office of Legacy Management -- Lucius Pitkin - NY 0-15  

Office of Legacy Management (LM)

Lucius Pitkin - NY 0-15 Lucius Pitkin - NY 0-15 FUSRAP Considered Sites Site: Lucius Pitkin (NY.0-15 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 47 Fulton Street , New York , New York NY.0-15-1 Evaluation Year: 1987 NY.0-15-1 Site Operations: No MED or AED work done at this site. Contractor supervised activities at Middlesex Sampling Plant in Middlesex, NJ such as assaying, sampling and weighing of ore. NY.0-15-1 NY.0-15-2 Site Disposition: Eliminated - No radioactive material handled at this site NY.0-15-1 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None NY.0-15-1 NY.0-15-2 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see

91

DOE - Office of Legacy Management -- Wolff-Alport and Co - NY 30  

Office of Legacy Management (LM)

Wolff-Alport and Co - NY 30 Wolff-Alport and Co - NY 30 FUSRAP Considered Sites Site: Wolff-Alport and Co (NY.30) Eliminated from consideration under FUSRAP - Referred to US EPA Region II and New York City Department of Health Designated Name: Not Designated Alternate Name: None Location: 1127 Irving Avenue , Brooklyn , New York NY.30-1 Evaluation Year: 1987 NY.30-1 Site Operations: Commercial operation -- sold thorium residues to the AEC, which in turn shipped the residues to Maywood for storage. NY.30-2 Site Disposition: Eliminated - No Authority NY.30-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium NY.30-2 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP - Referred to US EPA Region II and New York City Department of Health NY.30-1

92

DOE - Office of Legacy Management -- Frederick Flader Inc - NY 0-13  

NLE Websites -- All DOE Office Websites (Extended Search)

Frederick Flader Inc - NY 0-13 Frederick Flader Inc - NY 0-13 FUSRAP Considered Sites Site: Frederick Flader, Inc. (NY.0-13 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Frederick Flader Division of Eaton Manufacturing Co. NY.0-13-1 Location: 583 Division Street , N. Tonawanda , New York NY.0-13-1 Evaluation Year: 1987 NY.0-13-1 Site Operations: Provided consulting services and supported development of auxiliary equipment related to nuclear power NY.0-13-1 Site Disposition: Eliminated NY.0-13-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated NY.0-13-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Frederick Flader, Inc.

93

DOE - Office of Legacy Management -- Union Mines Development Corp - NY 0-22  

Office of Legacy Management (LM)

Mines Development Corp - NY Mines Development Corp - NY 0-22 FUSRAP Considered Sites Site: UNION MINES DEVELOPMENT CORP. (NY.0-22) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Union Carbide NY.0-22-1 Location: New York , New York NY.0-22-1 Evaluation Year: 1987 NY.0-22-1 Site Operations: The company owned uranium mines or reserves located in the western U.S. NY.0-22-1 Site Disposition: Eliminated - No reason to believe radioactive material was used at this site NY.0-22-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated NY.0-22-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to UNION MINES DEVELOPMENT CORP.

94

DOE - Office of Legacy Management -- Fordham University - NY 0-12  

Office of Legacy Management (LM)

Fordham University - NY 0-12 Fordham University - NY 0-12 FUSRAP Considered Sites Site: Fordham University (NY.0-12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.0-12-1 Evaluation Year: 1987 NY.0-12-1 Site Operations: Research and development involving small quantities of radioactive material in a controlled environment NY.0-12-1 Site Disposition: Eliminated - Potential for contamination remote NY.0-12-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Not Specified NY.0-12-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Fordham University NY.0-12-1 - Aerospace Letter; Young to Wallo; Subject: Elimination

95

DOE - Office of Legacy Management -- Floyd Bennett Field - NY 0-11  

Office of Legacy Management (LM)

Floyd Bennett Field - NY 0-11 Floyd Bennett Field - NY 0-11 FUSRAP Considered Sites Site: Floyd Bennett Field (NY.0-11 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Naval Air Station NY.0-11-1 Location: Buildings 67 and 69 , Brooklyn , New York NY.0-11-1 Evaluation Year: 1987 NY.0-11-1 Site Operations: The Air station was considered by the AEC but was not used. NY.0-11-1 Site Disposition: Eliminated - No involvement with MED/AEC operations NY.0-11-1 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Floyd Bennett Field NY.0-11-1 - Memorandum/Checklist; Wallo to the File; Subject: Elimination of Floyd Bennett Field; December 7, 1987

96

EMSL: Science: Biogeochemistry Grand Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

Biogeochemistry Grand Challenge Shewanella oneidensis MR-1 growing on a hematite surface Shewanella oneidensis MR-1 growing on a hematite surface. A Grand Challenge in...

97

Clean Cities: Clean Communities of Western New York (Buffalo) coalition  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Clean Communities of Western New York (Buffalo) Coalition Clean Communities of Western New York (Buffalo) Coalition The Clean Communities of Western New York (Buffalo) coalition works with vehicle fleets, fuel providers, community leaders, and other stakeholders to reduce petroleum use in transportation. Clean Communities of Western New York (Buffalo) coalition Contact Information Craig Jackson 716-362-9543 cjackson@ccofwny.org Coalition Website Clean Cities Coordinator Craig Jackson Photo of Craig Jackson Craig Jackson has been the Coordinator of Clean Communities of WNY since Nov. 2012. Jackson's role as coordinator is to assure that local partnerships are built to reduce petroleum use in transportation. Mr. Jackson has worked in the rotating equipment industry servicing the Oil & Gas, Power Generation and Air Separation markets for over 6 years. Jackson

98

Multispectral Imaging At Buffalo Valley Hot Springs Area (Laney, 2005) |  

Open Energy Info (EERE)

Multispectral Imaging At Buffalo Valley Hot Springs Multispectral Imaging At Buffalo Valley Hot Springs Area (Laney, 2005) Exploration Activity Details Location Buffalo Valley Hot Springs Area Exploration Technique Multispectral Imaging Activity Date Usefulness useful DOE-funding Unknown Notes Remote Sensing for Exploration and Mapping of Geothermal Resources, Wendy Calvin, 2005. Task 1: Detailed analysis of hyperspectral imagery obtained in summer of 2003 over Brady's Hot Springs region was completed and validated (Figure 1). This analysis provided a local map of both sinter and tufa deposits surrounding the Ormat plant, identified fault extensions not previously recognized from field mapping and has helped constrain where to put additional wells that were drilled at the site. Task 2: Initial analysis of Landsat and ASTER data for Buffalo Valley and Pyramid Lake was

99

Remote Sensing For Geothermal Exploration Over Buffalo Valley, Nv | Open  

Open Energy Info (EERE)

Sensing For Geothermal Exploration Over Buffalo Valley, Nv Sensing For Geothermal Exploration Over Buffalo Valley, Nv Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Remote Sensing For Geothermal Exploration Over Buffalo Valley, Nv Details Activities (1) Areas (1) Regions (0) Abstract: Remote sensing is a useful tool for identifying the surface expression of geothermal systems based on characteristic mineral assemblages that result from hydrothermal alteration (Kratt et al., 2004; Vaughan et al., 2005). Buffalo Valley in Pershing and Lander Counties, Nevada, is an area of high potential for geothermal energy production (Shevenell et al., 2004). Geothermal heat is expressed by several hot springs with surface temperatures of up to 79°C (Olmsted et al., 1975). The hot springs and a chain of Quaternary cinder cones appear to be

100

DOE - Office of Legacy Management -- Buffalo_FUSRAP  

Office of Legacy Management (LM)

York York Buffalo, New York, Site FUSRAP Site Buffalo Map Background-The Buffalo, New York, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-In 1952, the Bliss and Laughlin Steel Company machined and straightened uranium rods under subcontract to National Lead of Ohio, a prime AEC contractor. The activities generated waste cuttings which were shipped to the Lake Ontario Ordinance Works. A 1992 preliminary survey of the building interior and exterior identified radioactive material in the floor of the finishing area. Remediation of the Buffalo Site began in December 1998 and continued

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Geothermometry At Buffalo Valley Hot Springs Area (Laney, 2005) | Open  

Open Energy Info (EERE)

Buffalo Valley Hot Springs Area (Laney, 2005) Buffalo Valley Hot Springs Area (Laney, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Buffalo Valley Hot Springs Area (Laney, 2005) Exploration Activity Details Location Buffalo Valley Hot Springs Area Exploration Technique Geothermometry Activity Date Usefulness not indicated DOE-funding Unknown Notes Geochemical Sampling of Thermal and Non-thermal Waters in Nevada, Shevenell and Garside. The objective of this project is to obtain geochemical data from springs (and some wells) for which data are not publicly available, or for which the analyses are incomplete, poor, or nonexistent. With these data, geothermometers are being calculated and a preliminary assessment of the geothermal potential and ranking of the sampled areas is being

102

City of Buffalo, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Buffalo, Iowa (Utility Company) Buffalo, Iowa (Utility Company) Jump to: navigation, search Name City of Buffalo Place Iowa Utility Id 40390 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Electric Service Rates Residential Security Lights Lighting Temporary Construction Services Commercial Average Rates Residential: $0.0880/kWh Commercial: $0.0842/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Buffalo,_Iowa_(Utility_Company)&oldid=409386"

103

Consolidated Edison Co-NY Inc | Open Energy Information  

Open Energy Info (EERE)

Consolidated Edison Co-NY Inc Consolidated Edison Co-NY Inc (Redirected from ConEdison) Jump to: navigation, search Name Consolidated Edison Co-NY Inc Place New York, New York Service Territory New York Website www.coned.com Green Button Landing Page www.coned.com/customercen Green Button Reference Page www.whitehouse.gov/blog/2 Green Button Implemented Yes Utility Id 4226 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now!

104

RECIPIENT:Town of Brookhaven STATE: NY PROJECT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Town of Brookhaven STATE: NY Town of Brookhaven STATE: NY PROJECT EECBG (S) - Brookhaven (NY): Henrietta Acampora Recreation Center TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000013 DE-EE0000688 GFO-0000688-002 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (autborized under DOE Order 4St.tA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

105

Consolidated Edison Co-NY Inc | Open Energy Information  

Open Energy Info (EERE)

NY Inc NY Inc Jump to: navigation, search Name Consolidated Edison Co-NY Inc Place New York, New York Service Territory New York Website www.coned.com Green Button Reference Page www.whitehouse.gov/sites/ Green Button Committed Yes Utility Id 4226 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Consolidated Edison Company of New York, Inc. Smart Grid Demonstration

106

DOE - Office of Legacy Management -- Wilson Warehouse - NY 64  

Office of Legacy Management (LM)

Wilson Warehouse - NY 64 Wilson Warehouse - NY 64 FUSRAP Considered Sites Site: Wilson Warehouse (NY.64) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

107

DOE - Office of Legacy Management -- Pfohl Brothers Landfill - NY 66  

Office of Legacy Management (LM)

Pfohl Brothers Landfill - NY 66 Pfohl Brothers Landfill - NY 66 FUSRAP Considered Sites Site: Pfohl Brothers Landfill (NY.66 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Five-Year Review Report Pfohl Brothers Landfill Superfund Site Erie County Town of Cheektowaga, New York EPA REGION 2 Congressional District(s): 30 Erie Cheektowaga NPL LISTING HISTORY Documents Related to Pfohl Brothers Landfill Historical documents may contain links which are no longer valid or to outside sources. LM can not attest to the accuracy of information provided by these links. Please see the Leaving LM Website page for more details.

108

Business Council of Westchester County (NY) | Open Energy Information  

Open Energy Info (EERE)

of Westchester County (NY) of Westchester County (NY) Jump to: navigation, search Name Business Council of Westchester County (NY) Address 108 Corporate Park Drive, Suite 101 Place White Plains, New York Zip 10604 Sector Services Product Green Power Marketer Website http://www.westchesterny.org/ Coordinates 41.0200884°, -73.7206631° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0200884,"lon":-73.7206631,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

109

DOE - Office of Legacy Management -- Colorado Fuel and Iron - NY 0-08  

Office of Legacy Management (LM)

Fuel and Iron - NY 0-08 Fuel and Iron - NY 0-08 FUSRAP Considered Sites Site: Colorado Fuel and Iron (NY.0-08 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Watervliet , New York NY.0-08-1 Evaluation Year: 1987 NY.0-08-1 Site Operations: Site was a contractor to DuPont. Exact nature of operations is not clear. No records to indicate that radioactive materials were handled at the site. NY.0-08-1 Site Disposition: Eliminated NY.0-08-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Colorado Fuel and Iron NY.0-08-1 - DOE Memorandum/Checklist; S.Jones to the File; Subject:

110

DOE - Office of Legacy Management -- Long Island College of Medicine - NY  

Office of Legacy Management (LM)

Long Island College of Medicine - Long Island College of Medicine - NY 0-14 FUSRAP Considered Sites Site: Long Island College of Medicine (NY.0-14 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.0-14-1 Evaluation Year: 1987 NY.0-14-1 Site Operations: Performed research utilizing small quantities of radioactive materials in a controlled environment. NY.0-14-1 Site Disposition: Eliminated - Potential for contamination remote NY.0-14-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Not Specified NY.0-14-1 Radiological Survey(s): None Indicated NY.0-14-1 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Long Island College of Medicine

111

DOE - Office of Legacy Management -- Colonie - NY 06  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

112

Distributed Generation Study/SUNY Buffalo | Open Energy Information  

Open Energy Info (EERE)

Distributed Generation Study/SUNY Buffalo Distributed Generation Study/SUNY Buffalo < Distributed Generation Study Jump to: navigation, search Study Location Buffalo, New York Site Description Institutional-School/University Study Type Long-term Monitoring Technology Microturbine Prime Mover Capstone C60 Heat Recovery Systems Built-in Fuel Natural Gas System Installer Gerster Trane System Enclosure Outdoor System Application Combined Heat and Power Number of Prime Movers 2 Stand-alone Capability None Power Rating 120 kW0.12 MW 120,000 W 120,000,000 mW 1.2e-4 GW 1.2e-7 TW Nominal Voltage (V) 480 Heat Recovery Rating (BTU/hr) 600000 Cooling Capacity (Refrig/Tons) Origin of Controller Manufacturer-Integrated Component Integration Factory Integrated Start Date 2002/12/11 Monitoring Termination Date 2004/08/11

113

Buffalo Mountain Wind Energy Center I | Open Energy Information  

Open Energy Info (EERE)

Buffalo Mountain Wind Energy Center I Buffalo Mountain Wind Energy Center I Facility Buffalo Mountain Wind Energy Center Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Tennessee Valley Authority Developer EnXco Energy Purchaser Tennessee Valley Authority Location Anderson County TN Coordinates 36.115822°, -84.333742° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.115822,"lon":-84.333742,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

114

Buffalo Ridge II Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

Buffalo Ridge II Wind Power Project Buffalo Ridge II Wind Power Project Facility Buffalo Ridge II Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Location Brookings and Deuel counties SD Coordinates 44.55761°, -96.742888° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.55761,"lon":-96.742888,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

115

Buffalo Gap 3 Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Buffalo Gap 3 Wind Farm Buffalo Gap 3 Wind Farm Facility Buffalo Gap 3 Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner AES Wind Generation Developer AES Wind Generation Energy Purchaser Direct Energy Location TX Coordinates 32.310556°, -100.149167° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.310556,"lon":-100.149167,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

116

Buffalo Ridge Wind Farm I | Open Energy Information  

Open Energy Info (EERE)

Buffalo Ridge Wind Farm I Buffalo Ridge Wind Farm I Facility Buffalo Ridge Wind Farm I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Energy Purchaser NIPSCO Location Brookings County SD Coordinates 44.422784°, -96.834898° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.422784,"lon":-96.834898,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

117

Assessment of Summer RBOB Supply for NY & CT  

Gasoline and Diesel Fuel Update (EIA)

Update of Summer Reformulated Gasoline Supply Update of Summer Reformulated Gasoline Supply Assessment for New York and Connecticut May 5, 2004 In October 2003, EIA published a review of the status of the methyl tertiary butyl ether (MTBE) ban transition in New York (NY) and Connecticut (CT) 1 that noted significant uncertainties in gasoline supply for those States for the summer of 2004. To obtain updated information, EIA spoke to major suppliers to the two States over the past several months as the petroleum industry began the switch from winter- to summer-grade gasoline. As discussed on our earlier report, the NY and CT bans on MTBE mainly affect reformulated gasoline (RFG), which in recent years has been provided by domestic refineries on the East Coast (PADD 1) and imports. Our recent findings indicate that

118

Public Facility Location Using Dispersion, Population, and Equity ...  

E-Print Network (OSTI)

... University at Buffalo (SUNY), Buffalo, NY 14260. Department of Decision Sciences, School of Business, The George Washington University, Washington,. DC...

119

Characterization of TiOxNy nanoparticles embedded in HfOxNy as charge trapping nodes for nonvolatile memory device applications  

Science Conference Proceedings (OSTI)

Silicon-oxide-nitride-oxide-silicon devices with nanoparticles (NPs) as charge trapping nodes (CTNs) are important to provide enhanced performance for nonvolatile memory devices. To study these topics, the TiO"xN"y metal oxide NPs embedded in the HfO"xN"y ... Keywords: Charge trapping nodes, HfOxNy, Nanoparticles, Nonvolatile memory devices, TiOxNy

Chien-Wei Liu; Chin-Lung Cheng; Kuei-Shu Chang-Liao; Jin-Tsong Jeng; Bau-Tong Dai; Chen-Pang Tsai

2009-07-01T23:59:59.000Z

120

U.S. Army Corps of Engineers Buffalo District Office 1776 Niagara Street, Buffalo, New York, 14207  

Office of Legacy Management (LM)

Army Corps of Engineers Army Corps of Engineers Buffalo District Office 1776 Niagara Street, Buffalo, New York, 14207 Explanation of Significant Differences for the Rattlesnake Creek Portion of the Ashland Sites Tonawanda, New York September 20, 2004 Formerly Utilized Sites Remedial Action Program Explanation of Significant Differences for the Rattlesnake Creek Portion of the Ashland Sites Table of Contents I. INTRODUCTION 1 II. SITE mSTORY, CONTAMINATION AND SELECTED REMEDy 2 A. Site History 2 B. Original Remedy 3 III. BASIS FOR TmS DOCUMENT.................................*...................*..........*................*.**** 3 A. Summary of Additional Information 3 B. References 4 IV. DESCRIPTION OF SIGNIFICANT DIFFERENCES 4 V. SUPPORT AGENCY COMMENTS 5 VI. STATUTORY DETERMINATIONS 5

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Assignment of PCR markers to river buffalo chromosomes  

E-Print Network (OSTI)

Note Assignment of PCR markers to river buffalo chromosomes Hanaa A. Oraby Soheir M. El Nahas H physical map using somatic cell hybrids and the cattle gene map as a template, ten PCR primers designed / chromosome / synteny / PCR markers / gene mapping * Correspondence and reprints Résumé - Assignation de

Recanati, Catherine

122

Buffalo Valley Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Buffalo Valley Hot Springs Geothermal Area Buffalo Valley Hot Springs Geothermal Area (Redirected from Buffalo Valley Hot Springs Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Buffalo Valley Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (6) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.368333,"lon":-117.325,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

123

Trends, seasonal cycles and synpotic scale episodes of halocarbons observed in Ny-lesund, Spitsbergen.  

E-Print Network (OSTI)

??A study of the important gases in the air at the Ny-lesund measuring station at Svalbard is presented in this thesis. The monitoring station is (more)

Fjraa, Ann Mari

2005-01-01T23:59:59.000Z

124

Mississippi Nuclear Profile - Grand Gulf  

U.S. Energy Information Administration (EIA) Indexed Site

Grand Gulf" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

125

City of Buffalo, Minnesota (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Buffalo Buffalo Place Minnesota Utility Id 2485 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Transmission Yes Activity Retail Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial (above 50 KW demand) Commercial Commercial Service (Less than 50 KW) Commercial Residential Rate Residential Security Light Service 100 W HPS Lighting Security Light Service 150 W HPS Lighting Security Light Service 250 W HPS Lighting Security Light Service 400 W HPS Lighting Average Rates

126

Buffalo Gap II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Gap II Wind Farm Gap II Wind Farm Jump to: navigation, search Name Buffalo Gap II Wind Farm Facility Buffalo Gap II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer AES Corp. Energy Purchaser Direct Energy Location Taylor County TX Coordinates 32.310556°, -100.149167° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.310556,"lon":-100.149167,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

127

<GrandPrairie>  

NLE Websites -- All DOE Office Websites (Extended Search)

Grande Praire Wind Farm, O'Neill, NE Grande Praire Wind Farm, O'Neill, NE The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), intends to prepare an environmental impact statement (EIS) on the proposed interconnection of the Grande Prairie Wind Farm (Project) in Holt County, near the city of O'Neill, Nebraska. Grande Prairie Wind, LLC (Grande Prairie), a subsidiary of Midwest Wind Energy Development Group, LLC, has applied to Western to interconnect their proposed Project to Western's power transmission system. Western is issuing this notice to inform the public and interested parties about Western's intent to prepare an EIS, conduct a public scoping process, and invite the public to comment on the scope, proposed action, alternatives, and other issues to be addressed in the EIS.

128

Buffalo Valley Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Buffalo Valley Hot Springs Geothermal Area Buffalo Valley Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Buffalo Valley Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (6) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.368333,"lon":-117.325,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

129

Renewable Energy Network of Entrepreneurs in Western New York RENEW NY |  

Open Energy Info (EERE)

Network of Entrepreneurs in Western New York RENEW NY Network of Entrepreneurs in Western New York RENEW NY Jump to: navigation, search Name Renewable Energy Network of Entrepreneurs in Western New York (RENEW NY) Place Rochester, New York Zip 14623 Sector Renewable Energy Product US-based incubator fund, Renewable Energy Network of Entrepreneurs in Western New York, helps early stage renewable energy companies to start and grow in Western New York. References Renewable Energy Network of Entrepreneurs in Western New York (RENEW NY)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Renewable Energy Network of Entrepreneurs in Western New York (RENEW NY) is a company located in Rochester, New York . References ↑ "Renewable Energy Network of Entrepreneurs in Western New York

130

Rio Grande Compact (Texas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rio Grande Compact (Texas) Rio Grande Compact (Texas) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility StateProvincial Govt Industrial...

131

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Interconnection of the Buffalo Ridge III Wind Project, 37: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota Summary This EIS evaluates the environmental impacts of a proposal to interconnect the Heartland Wind, LLC, proposed Buffalo Ridge III Wind Project in Brookings and Deuel Counties, South Dakota, to DOE's Western Area Power Administration transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 29, 2012 EIS-0437: Notice of Cancellation of an Environmental Impact Statement Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD

132

Integrys Energy Services of N.Y., Inc. | Open Energy Information  

Open Energy Info (EERE)

Services of N.Y., Inc. Services of N.Y., Inc. (Redirected from Integrys) Jump to: navigation, search Name Integrys Energy Services of N.Y., Inc. Place New York Utility Id 21258 Utility Location Yes Ownership R ISO NY Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.0625/kWh Commercial: $0.0809/kWh Industrial: $0.0631/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Integrys_Energy_Services_of_N.Y.,_Inc.&oldid=410875

133

Neutrino Mass and Grand Unification  

E-Print Network (OSTI)

Seesaw mechanism appears to be the simplest and most appealing way to understand small neutrino masses observed in recent experiments. It introduces three right handed neutrinos with heavy masses to the standard model, with at least one mass required by data to be close to the scale of conventional grand unified theories. This may be a hint that the new physics scale implied by neutrino masses and grand unification of forces are one and the same. Taking this point of view seriously, I explore different ways to resolve the puzzle of large neutrino mixings in grand unified theories such as SO(10) and models based on its subgroup $SU(2)_L\\times SU(2)_R\\times SU(4)_c$.

R. N. Mohapatra

2004-12-03T23:59:59.000Z

134

EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Hyde County Wind Energy Center Project, Hyde and Buffalo 61: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota Summary This EIS will evaluate the environmental impacts of interconnecting the proposed 150 megawatt Hyde County Wind Energy Center Project, in Hyde County, South Dakota, with DOE's Western Area Power Administration's existing Fort Thompson Substation in Buffalo County, South Dakota. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download October 19, 2011 EIS-0461: Notice of Cancellation of the Environmental Impact Statement Hyde County Wind energy Center Project November 30, 2010 EIS-0461: Notice of Intent to Prepare an Environmental Impact Statement and

135

Spelunking in La Cueva Grande  

Science Conference Proceedings (OSTI)

La Cueva Grande is the 5-sided immersive facility put into place at Los Alamos National Laboratory. It was the highest-resolution stereo immersive facility in the world at the time of first use in 2005. The design and common use cases of LCG are presented, ... Keywords: projection systems, virtual reality

Laura Monroe

2008-08-01T23:59:59.000Z

136

Grand Challenges in Energy by Secretary Steven Chu | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Challenges in Energy by Secretary Steven Chu Grand Challenges in Energy by Secretary Steven Chu Grand Challenges in Energy by Secretary Steven Chu More Documents &...

137

The Particle Adventure | Unsolved Mysteries | Grand Unified Theory  

NLE Websites -- All DOE Office Websites (Extended Search)

Unsolved Mysteries - Grand Unified Theory Grand Unified Theory Today, one of the major goals of particle physics is to unify the various fundamental forces in a Grand Unified...

138

PP-53 Rio Grande Electric Cooperative, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. Presidential Permit authorizing Rio Grande Electric Cooperative, Inc.to construct, operate, and...

139

PP-33 Rio Grande Electric Cooperative Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rio Grande Electric Cooperative Inc PP-33 Rio Grande Electric Cooperative Inc Presidential permit authorizing Grande Electric Cooperative Inc to construct, operate, and maintain...

140

Buffalo Mountain Wind Energy Center II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Buffalo Mountain Wind Energy Center Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser Tennessee Valley Authority Location Anderson County TN Coordinates 36.115822°, -84.333742° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.115822,"lon":-84.333742,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EV Everywhere Grand Challenge Blueprint  

NLE Websites -- All DOE Office Websites (Extended Search)

A Message from A Message from the Assistant Secretary Every challenge presents an even greater opportunity, and the EV Everywhere Grand Challenge is no exception. The need for clean energy solutions drives the most important economic development race of the 21st century, providing opportunity for America to invent, manufacture, and export clean energy technologies. Recognizing that vehicle electrification is an essential part of our country's "all-of-the above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to be the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years.

142

DOE - Office of Legacy Management -- West Milton Reactor Site - NY 21  

Office of Legacy Management (LM)

Milton Reactor Site - NY 21 Milton Reactor Site - NY 21 FUSRAP Considered Sites Site: West Milton Reactor Site (NY.21) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

143

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

144

New York Battery and Energy Storage Technology Consortium NY BEST | Open  

Open Energy Info (EERE)

Storage Technology Consortium NY BEST Storage Technology Consortium NY BEST Jump to: navigation, search Name New York Battery and Energy Storage Technology Consortium (NY-BEST) Place Albany, New York Zip 12203 Product Albany-based project of NYSERDA promoting battery and energy storage in New York. Coordinates 42.707237°, -89.436378° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.707237,"lon":-89.436378,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

145

DOE - Office of Legacy Management -- Pier 38 - NY 0-18  

Office of Legacy Management (LM)

Pier 38 - NY 0-18 Pier 38 - NY 0-18 FUSRAP Considered Sites Site: Pier 38 (NY.0-18 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

146

DOE Awards Small Business Contract for West Valley NY Services | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract for West Valley NY Services Contract for West Valley NY Services DOE Awards Small Business Contract for West Valley NY Services September 26, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 CINCINNATI - The Department of Energy (DOE) today awarded a task order (contract) to Chenega Global Services, LLC of Anchorage, Alaska, for administrative and technical support services at the West Valley Demonstration Project, West Valley, New York. The contract has a one-year performance period with a value of $1.3 million, and contains two one-year extension options with a total value of $4.12 million. Chenega Global Services is a certified small and disadvantaged business under the Small Business Administration. The West Valley Demonstration Project is a former commercial nuclear fuel

147

Weatherization Subgrantees Reach More N.Y. Homes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subgrantees Reach More N.Y. Homes Subgrantees Reach More N.Y. Homes Weatherization Subgrantees Reach More N.Y. Homes April 22, 2010 - 4:37pm Addthis Lindsay Gsell Thanks to funds from the Recovery Act, New York expanded its network of weatherization subgrantees. The state has added nine additional subgrantees to its network of 66 community-based organizations that provide energy conservation services on a local level. New York's Division of Housing and Community Renewal received slightly more than $100 million for Weatherization Assistance Program in 2009, a significant increase from its previous annual allotment of approximately $60 million. In addition to this increase in annual funding, DHCR also received $394 million in WAP stimulus funding from the Recovery Act. "New York's success has been built on a network of sub grantees and

148

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

149

Mountain View Grand | Open Energy Information  

Open Energy Info (EERE)

Grand Grand Jump to: navigation, search Name Mountain View Grand Facility Mountain View Grand Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner Mountain View Grand Developer Sustainable Energy Developments Energy Purchaser Mountain View Grand Location Mountain View Grand Resort & Spa NH Coordinates 44.397987°, -71.590306° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.397987,"lon":-71.590306,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

150

A parameterization of the Fermat curves satisfying x^(2N)+y^(2N)=1  

E-Print Network (OSTI)

Note that the family of closed curves C_N={(x,y)\\in R^2;x^(2N)+y^(2N)=1} for N=1,2,3,... approaches the boundary of [-1,1]^2 as N \\to \\infty. In this paper we exhibit a natural parameterization of these curves and generalize to a larger class of equations.

Kerry M. Soileau

2007-07-20T23:59:59.000Z

151

Joint Metering and Conflict Resolution in Air Traffic Control Jerome Le Ny  

E-Print Network (OSTI)

Joint Metering and Conflict Resolution in Air Traffic Control Jerome Le Ny and George J. Pappas programming. A key feature of this approach is its ability to also take into account various metering and metering in order to support this task. This paper addresses this problem by presenting a trajectory

Plotkin, Joshua B.

152

Buffalo Regional Middle School Science Bowl | U.S. DOE Office of Science  

Office of Science (SC) Website

Buffalo Regional Middle Buffalo Regional Middle School Science Bowl National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov New York Regions Buffalo Regional Middle School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Jeffrey Welton Email: nywelton@yahoo.com Regional Event Information Date: Saturday, March 8, 2014 Maximum Number of Teams: 20

153

Compound and Elemental Analysis At Buffalo Valley Hot Springs Area (Laney,  

Open Energy Info (EERE)

Compound and Elemental Analysis At Buffalo Valley Hot Compound and Elemental Analysis At Buffalo Valley Hot Springs Area (Laney, 2005) Exploration Activity Details Location Buffalo Valley Hot Springs Area Exploration Technique Compound and Elemental Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Geochemical Sampling of Thermal and Non-thermal Waters in Nevada, Shevenell and Garside. The objective of this project is to obtain geochemical data from springs (and some wells) for which data are not publicly available, or for which the analyses are incomplete, poor, or nonexistent. With these data, geothermometers are being calculated and a preliminary assessment of the geothermal potential and ranking of the sampled areas is being conducted using the new geochemical data. Objectives changed slightly in

154

Water Sampling At Buffalo Valley Hot Springs Area (Laney, 2005) | Open  

Open Energy Info (EERE)

Water Sampling At Buffalo Valley Hot Springs Area Water Sampling At Buffalo Valley Hot Springs Area (Laney, 2005) Exploration Activity Details Location Buffalo Valley Hot Springs Area Exploration Technique Water Sampling Activity Date Usefulness not indicated DOE-funding Unknown Notes Geochemical Sampling of Thermal and Non-thermal Waters in Nevada, Shevenell and Garside. The objective of this project is to obtain geochemical data from springs (and some wells) for which data are not publicly available, or for which the analyses are incomplete, poor, or nonexistent. With these data, geothermometers are being calculated and a preliminary assessment of the geothermal potential and ranking of the sampled areas is being conducted using the new geochemical data. Objectives changed slightly in 2004. Samples are now being collected at sites identified by other

155

Isotopic Analysis At Buffalo Valley Hot Springs Area (Laney, 2005) | Open  

Open Energy Info (EERE)

Isotopic Analysis- Fluid At Buffalo Valley Hot Isotopic Analysis- Fluid At Buffalo Valley Hot Springs Area (Laney, 2005) Exploration Activity Details Location Buffalo Valley Hot Springs Area Exploration Technique Isotopic Analysis- Fluid Activity Date Usefulness not indicated DOE-funding Unknown Notes Geochemical Sampling of Thermal and Non-thermal Waters in Nevada, Shevenell and Garside. The objective of this project is to obtain geochemical data from springs (and some wells) for which data are not publicly available, or for which the analyses are incomplete, poor, or nonexistent. With these data, geothermometers are being calculated and a preliminary assessment of the geothermal potential and ranking of the sampled areas is being conducted using the new geochemical data. Objectives changed slightly in

156

Vehicle Technologies Office: EV Everywhere Grand Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

Charging Community and Fleet Readiness Workforce Development Plug-in Electric Vehicle Basics EV Everywhere Grand Challenge With their immense potential for increasing the...

157

Review: Red Pedagogy: Native American Social and Political Thought by Sandy Grande  

E-Print Network (OSTI)

and Political Thought by Sandy Grande. New York: Rowman &discourse. For these reasons, Sandy Grandes (2004) text

Caldern, Dolores

2006-01-01T23:59:59.000Z

158

Microsoft Word - GrandCoulee_FONSI.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project BPA's Finding of No Significant Impact 1 Bonneville Power Administration's Finding of No Significant Impact (FONSI) for the Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project DOE/EA-1679 SUMMARY The Bonneville Power Administration (BPA) announces its environmental findings on the Bureau of Reclamation's (Reclamation) Grand Coulee Third Powerplant 500-kV Transmission Line Replacement Project. This project involves replacing the six 500-kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile west of the TPP. BPA would design and construct

159

MHK Projects/GCK Technology Shelter Island NY US | Open Energy Information  

Open Energy Info (EERE)

Shelter Island NY US Shelter Island NY US < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0682,"lon":-72.3387,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

160

DOE - Office of Legacy Management -- Pfaltz and Bauer Inc - New York - NY  

Office of Legacy Management (LM)

New York - New York - NY 45 FUSRAP Considered Sites Site: Pfaltz and Bauer Inc - New York (NY.45) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

File:EIA-Appalach1-NY-BOE.pdf | Open Energy Information  

Open Energy Info (EERE)

EIA-Appalach1-NY-BOE.pdf EIA-Appalach1-NY-BOE.pdf Jump to: navigation, search File File history File usage Appalachian Basin, New York Area Oil and Gas Fields By 2001 BOE Reserve Class Size of this preview: 776 × 600 pixels. Full resolution ‎(6,600 × 5,100 pixels, file size: 12.75 MB, MIME type: application/pdf) Description Appalachian Basin, New York Area Oil and Gas Fields By 2001 BOE Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional Countries United States UN Region Northern America States New York File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment

162

File:USDA-CE-Production-GIFmaps-NY.pdf | Open Energy Information  

Open Energy Info (EERE)

NY.pdf NY.pdf Jump to: navigation, search File File history File usage New York Ethanol Plant Locations Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 324 KB, MIME type: application/pdf) Description New York Ethanol Plant Locations Sources United States Department of Agriculture Related Technologies Biomass, Biofuels, Ethanol Creation Date 2010-01-19 Extent State Countries United States UN Region Northern America States New York External links http://www.nass.usda.gov/Charts_and_Maps/Ethanol_Plants/ File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:19, 27 December 2010 Thumbnail for version as of 16:19, 27 December 2010 1,650 × 1,275 (324 KB) MapBot (Talk | contribs) Automated bot upload

163

SunShot Grand Challenge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28...

164

Affirmatively furthering fair housing : overcoming barriers to implementation of the Westchester County, NY false claims case settlement  

E-Print Network (OSTI)

Westchester County, NY was sued by the Anti-Discrimination Center of Metro New York, Inc. (ADC) under the False Claims Act for allegedly failing to meet its Affirmatively Further Fair Housing obligation for Community ...

Stein, Julie Iris

2010-01-01T23:59:59.000Z

165

Built waterfront through edge, connection, and exchange : reclaiming a waterfront for Greenpoint, a project in Brooklyn, N.Y.  

E-Print Network (OSTI)

Currently the waterfront of Brooklyn N.Y. between the Gowanus Canal of Redhook and the Newton Creek of Greenpoint is predominantly lined with various types of industrial and manufacturing uses. Scattered throughout are ...

Ziesemann, Rodney P. (Rodney Paul), 1967-

1998-01-01T23:59:59.000Z

166

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

167

Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show January 30,...

168

Sensitivity of Orographic Moist Convection to Landscape Variability: A Study of the Buffalo Creek, Colorado, Flash Flood Case of 1996  

Science Conference Proceedings (OSTI)

A number of numerical experiments with a high-resolution mesoscale model were conducted to study the convective rainfall event that caused the 1996 Buffalo Creek, Colorado, flash flood. Different surface conditions and treatments of land surface ...

Fei Chen; Thomas T. Warner; Kevin Manning

2001-11-01T23:59:59.000Z

169

Genetic and Phylogenetic Studies of Toll-Like Receptor 5 (TLR5) in River Buffalo (Bubalus Bubalis)  

E-Print Network (OSTI)

River buffalo are economically important to many countries and only recently has their genome been explored for the purpose of mapping genetic variation in traits of economic and biologic interest. The purpose of this research is to characterize the genetic and evolutionary profile of Toll-like receptor 5 (TLR5), which mediates the mammalian innate immune response to bacterial flagellin. This study is comprised of three parts: 1) generating a radiation hybrid (RH) map of river buffalo chromosome 5 (BBU5) where the TLR5 gene is located and building a comparative map with homologous cattle chromosomes; 2) conducting a single-nucleotide polymorphism (SNP) survey of the TLR5 gene to reveal variation within river buffalo and other species; and 3) performing an evolutionary study by inferring phylogenetic trees of TLR5 across multiple taxa and determining the possible evolutionary constraints within the TLR5 coding region. River buffalo chromosome 5 is a bi-armed chromosome with arms corresponding to cattle chromosomes 16 and 29. A BBU5 RH map was developed using the previously published river buffalo RH mapping panel and cattle-derived markers. The RH map developed in this study became an integral part of the first river buffalo whole genome RH map. Genetic variation of the TLR5 gene was evaluated in a small domestic herd of river buffalo. Sequencing of the TLR5 coding region and partial associated 5'- and 3'-untranslated regions yielded 16 novel SNPs. Six SNPs were identified as non-synonymous with one predicted to potentially code for a functionally altered product. For the evolutionary study of the TLR5 coding region, phylogenetic trees were inferred based on TLR5 variation across multiple orders and another for artiodactyla. Species that are closely related to river buffalo appear to have undergone negative selection in TLR5 while those that diverged from river buffalo earlier may be retaining alleles that river buffalo are removing from the population. In conclusion, putative chromosomal rearrangements were identified between river buffalo and cattle, the variation that was uncovered in the TLR5 coding region could potentially lead to differential immunity across species, and there appears be some evolutionary flexibility in the DNA sequence of the TLR5 coding region.

Jones, Brittany

2012-12-01T23:59:59.000Z

170

Grand Meadow Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Grand Meadow Wind Farm Grand Meadow Wind Farm Jump to: navigation, search Name Grand Meadow Wind Farm Facility Grand Meadow Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Developer EnXco Energy Purchaser Xcel Energy Location Dexter MN Coordinates 43.707798°, -92.654071° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.707798,"lon":-92.654071,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

171

EV Everywhere Grand Challenge - Battery Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Sandalow, Under Secretary of Energy (acting) and Assistant Secretary for Policy and International Affairs 8:45-8:55 AM SETTING THE STAGE FOR THE EV EVERYWHERE GRAND CHALLENGE Dr....

172

Funding for state, city, and county governments in the state includes:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NY NY New York Total Sum City, County, and SEO Allocations All $175,122,300 NY New York State Energy Office $29,760,600 NY Albany City $1,104,000 NY Amherst City $1,052,700 NY Babylon City $1,545,200 NY Binghamton City $204,200 NY Brookhaven City $4,141,200 NY Buffalo City $2,736,900 NY Cheektowaga City $718,800 NY Clarkstown City $751,300 NY Clay City $515,100 NY Clifton Park City $149,200 NY Colonie City $661,900 NY Freeport City $173,100 NY Greece City $831,900 NY Greenburgh City $186,000 NY Hamburg City $187,300 NY Hempstead City $4,577,700 NY Hempstead City $479,800 NY Henrietta City $213,700 NY Huntington City $1,725,200 NY Irondequoit City $440,000 NY Islip City $3,026,100 NY

173

NTSF Activities and Accomplishments  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Christopher Wells for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY

174

Cigarette Purchasing Patterns among New York Smokers: Implications for Health, Price, and Revenue  

E-Print Network (OSTI)

Davis Matthew Farrelly RTI International* 3040 CornwallisInstitute Buffalo, NY 14263 *RTI International is a trade

New York State Department of Health; (Kevin Davis); (Matthew Farrelly); (Qiang Li); (Andrew Hyland)

2006-01-01T23:59:59.000Z

175

WIPP Status Update  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Bill Mackie for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

176

Implementation of Section 180(c) of the Nuclear Waste Policy Act  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Corinne Macaluso for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

177

Coalition on West Valley Nuclear Wastes  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Joanne Hameister for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

178

Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Jeff Williams for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

179

The Proposed BNSF Settlement Agreement: Background & WIEB Comments  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Jim Williams for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

180

Update on Tribal Issues- Mapping Tool, Policy Statement, and Protocol Manual  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Stuart Easson for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Enhancing Railroad Hazardous Materials Transportation Safety Rail Routing  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Kevin Blackwell for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY

182

North American Standard Level VI Inspection Program Update: Ensuring Safe Transportation of Radioactive Material  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Carlisle Smith for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY

183

U.S. Global Threat Reduction Initiative/U.S.-Origin Nuclear Fuel Removals  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Chuck Messick for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

184

Structural, optical and electrical properties of WOxNy filmsdeposited by reactive dual magnetron sputtering  

SciTech Connect

Thin films of tungsten oxynitride were prepared by dual magnetron sputtering of tungsten using argon/oxygen/nitrogen gas mixtures with various nitrogen/oxygen ratios. The presence of even small amounts of oxygen had a great effect not only on the composition but on the structure of WOxNy films, as shown by Rutherford backscattering and x-ray diffraction, respectively. Significant incorporation of nitrogen occurred only when the nitrogen partial pressure exceeded 89 percent of the total reactive gas pressure. Sharp changes in the stoichiometry, deposition rate, room temperature resistivity, electrical activation energy and optical band gap were observed when the nitrogen/oxygen ratio was high.The deposition rate increased from 0.31 to 0.89 nm/s, the room temperature resistivity decreased from 1.65 x 108 to 1.82 x 10-2 ?cm, the electrical activation energy decreased from 0.97 to 0.067 eV, and the optical band gap decreased from 3.19 to 2.94 eV upon nitrogen incorporation into the films. WOxNy films were highly transparent as long as the nitrogen incorporation was low, and were brownish (absorbing) and partially reflecting as nitrogen incorporation became significant.

Mohamed, Sodky H.; Anders, Andre

2006-06-05T23:59:59.000Z

185

Rio Grande South | Open Energy Information  

Open Energy Info (EERE)

Rio Grande South Rio Grande South Facility Rio Grande South Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Gulf of Mexico TX Coordinates 26.189°, -97.053° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.189,"lon":-97.053,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

186

Rio Grande North | Open Energy Information  

Open Energy Info (EERE)

Rio Grande North Rio Grande North Facility Rio Grande North Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx Corporation Location Offshore from South Padre Island TX Coordinates 26.364°, -97.078° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.364,"lon":-97.078,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

187

District-heating system, La Grande, Oregon  

DOE Green Energy (OSTI)

The area suggested for district heating feasibility study encompassed slightly over 400 acres extending north and south from the geographic center of the city. This district was subdivided into 8 areas, which include the Grande Ronde Hospital, Eastern Oregon State College, La Grande school district, one institutional area, one commercial area and three residential areas. Basic space heating loads developed for the various areas after a survey by county personnel and computation using a computer program form the basis for this economic feasibility study.

Not Available

1982-01-01T23:59:59.000Z

188

SunShot Grand Challenge | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Grand Challenge SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28 SunShot Grand Challenge Participants gather for the plenary session at the SunShot Grand Challenge Summit and Technology Forum in Denver, Colorado. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:10 Arun Majumdar, Founding Director, ARPA-E 2 of 28 Arun Majumdar, Founding Director, ARPA-E Arun Majumdar, Founding Director, ARPA-E gives the welcoming remarks. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:16 Energy Secretary Steven Chu at SunShot Grand Challenge 3 of 28 Energy Secretary Steven Chu at SunShot Grand Challenge Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:32

189

Grand Unification with and without Supersymmetry  

Science Conference Proceedings (OSTI)

Grand Unified Theories based on the group SO(10) generically provide interesting and testable relations between the charged fermions and neutrino sector masses and mixings. In the light of the recent neutrino data, we reexamine these relations both in supersymmetric and non-supersymmetric models, and give a brief review of their present status.

Melfo, Alejandra [CFF, Universidad de Los Andes, Merida (Venezuela); Institute J. Stefan, Ljubljana (Slovenia)

2007-06-19T23:59:59.000Z

190

DOE Challenge Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY, Custom Home  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ferguson Design & Ferguson Design & Construction, Inc. Sagaponack, NY BUILDING TECHNOLOGIES OFFICE DOE Challenge Home builders are in the top 1% of builders in the country meeting the extraordinary levels of excellence and quality specifi ed by the U.S. Department of Energy. Every DOE Challenge Home starts with ENERGY STAR for Homes Version 3 for an energy-effi cient home built on a solid foundation of building science research. Then, even more advanced technologies are designed in for a home that goes above and beyond current code to give you the superior quality construction, HVAC, appliances, indoor air quality, safety, durability, comfort, and solar-ready components along with ultra-low or no utility bills. This provides homeowners with a quality home that will last for generations to come.

191

CRANE CO. 757 THIRD AVENUE NEW YORK. N.Y. THOMAS UNGERLAND ASSOCIATE GENERAL COUNSEL  

Office of Legacy Management (LM)

? ? z _ - c 0-e . CRANE CO. 757 THIRD AVENUE NEW YORK. N.Y. THOMAS UNGERLAND ASSOCIATE GENERAL COUNSEL December 14, 1987 James J. Fiore Director Office of Nuclear Energy Department of Energy Washington, D.C. Re: Crane - Indian Orchard Dear M r. Fiore: W e acknowledge receipt of your letter to Paul Hundt, dated September 29, 1987, which requests certain information about Crane's plant site in Indian Orchard, Massachusetts. The plant is not currently operating. Crane was unable to locate any records concerning the machining of uranium in the 1947-48 period for a customer, Brookhaven Labs, at the Indian Orchard, facility. It is believed that the records, which were kept on the second floor at 305 Hamshire Street, Indian Orchard, Massachusetts were moved ten or fifteen years ago

192

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah...

193

DOE - Office of Legacy Management -- Climax Uranium Co Grand...  

Office of Legacy Management (LM)

Climax Uranium Co Grand Junction Mill - CO 0-03 FUSRAP Considered Sites Site: Climax Uranium Co. (Grand Junction Mill) (CO.0-03) Designated Name: Alternate Name: Location:...

194

Energy Secretary Steven Chu to Attend Grand Opening of Recovery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123...

195

DECONTAMINATION OF DREDGED MATERIAL FROM PORT OF NY/NJ DECONTAMINATION OF DREDGED MATERIAL FROM THE PORT OF  

E-Print Network (OSTI)

of Liters Transported (Source: New Jersey Petroleum Council) Rank Port Liters 1 New York Harbor, NY/NJ 106 Jersey ranks first in the United States in volume of petroleum products handled each year. In addition to the discharge of significant amounts of petroleum hydrocarbons into the waters of the New York/New Jersey region

Brookhaven National Laboratory

196

LJUPKA ARSOVA 30-65 Steinway Street, Astoria, 11103 NY1-305-582-2559ljarsova@caa.columbia.edu  

E-Print Network (OSTI)

, NY Consultant for anaerobic digestion Nov. 2010- present Clinton Global Initiative- Cason Family Master Thesis research - "Anaerobic digestion of the food waste: current status, problems and alternative" "Microbial populations and their interactions in Anaerobic Digestion reactors" "A CO2-to-CH4 recycle loop

197

EV Everywhere Grand Challenge Kick-Off  

NLE Websites -- All DOE Office Websites (Extended Search)

EV Everywhere Grand Challenge Kick-Off Thursday, June 21, 2012 - Hyatt Regency, Dearborn, MI Event Objective: To showcase existing DOE efforts in vehicle electrification and to obtain stakeholder input on the overall concept of the EV Everywhere Grand Challenge, the high-level strategy, and aggressive next-generation technology development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program 8:35-8:45 AM STRATEGIC SIGNIFICANCE OF PLUG-IN ELECTRIC VEHICLES

198

Grand Ridge Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Grand Ridge Wind Farm Facility Grand Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Location La Salle County IL Coordinates 40.999966°, -88.401693° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.999966,"lon":-88.401693,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

199

Rio Grande pipeline introduces LPG to Mexico  

SciTech Connect

Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

NONE

1997-06-01T23:59:59.000Z

200

Agropecuaria e Industrial Serra Grande | Open Energy Information  

Open Energy Info (EERE)

Agropecuaria e Industrial Serra Grande Agropecuaria e Industrial Serra Grande Jump to: navigation, search Name Agropecuaria e Industrial Serra Grande Place São Raimundo das Mangabeiras, Maranhao, Brazil Product Privately owned Brazil based ethanol producer, located in the state of Maranhao. References Agropecuaria e Industrial Serra Grande[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Agropecuaria e Industrial Serra Grande is a company located in São Raimundo das Mangabeiras, Maranhao, Brazil . References ↑ "[ Agropecuaria e Industrial Serra Grande]" Retrieved from "http://en.openei.org/w/index.php?title=Agropecuaria_e_Industrial_Serra_Grande&oldid=341914" Categories:

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

An Evaluation of the Impact of the Niagara River Ice Boom on the Air Temperature Regime at Buffalo, New York  

Science Conference Proceedings (OSTI)

The objective of this study was to determine if the Niagara River ice boom has prolonged the Lake Erie ice cover at Buffalo, New York, resulting in significant changes in the spring warm-up of Lake Erie and longer, colder winters in the area. ...

Frank H. Quinn; Raymond A. Assel; Daniel W. Gaskill

1982-03-01T23:59:59.000Z

202

STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE THREE EMPIRE STATE PLAZA, ALBANY, NY 12223-1350  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEW YORK DEPARTMENT OF PUBLIC SERVICE NEW YORK DEPARTMENT OF PUBLIC SERVICE THREE EMPIRE STATE PLAZA, ALBANY, NY 12223-1350 www.dps.ny.gov PUBLIC SERVICE COMMISSIO~ PETER McGOWAN GARRY A. BROWN General Counsel Chairman PATRICIA L. ACAMPORA MAUREEN F. HARRIS JACLYN A, BRILLING ROBERT E. CURRY JR. Secretary JAMES L. LAROCCA Commissioners January 31, 2012 FILED ELECTRONICALLY @ http://energy.gov/oelcongestion-study-2012 Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. i0585 Re: Preparation ofthe 2012 Congestion Study Dear Sir or Madam: I am writing in response to the Notice of Regional Workshops and Request For Written Comments, 76 Federal Register No. 218, 70122 (November 10,2011). Enclosed please find the comments of

203

2012 SG Peer Review - Interoperability of Demand Response Resources in New York - Andre Wellington, ConEd NY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interoperability of Demand Response Interoperability of Demand Response Resources in NY Andre Wellington Con Edison June 8, 2012 December 2008 Interoperability of Demand Resource Resources in NY Objective Life-cycle Funding ($M) FY08 - FY13 $6.8 million Technical Scope (Insert graphic here) Develop and demonstrate technology required to integrate customer owned resources into the electrical distribution system * Evaluate interconnection designs * Design and install thermal storage plant with enhanced capabilities * Develop AutoDR application for targeted distributed resources 2 December 2008 Needs and Project Targets Develop the technology required to integrate customer owned distributed resources into the distribution system to enable the of deferment capital investments. * Remote dispatch of customer resources

204

Bat Interactions with Wind Turbines at the Buffalo Ridge, Minnesota Wind Resource Area: An Assessment of Bat Activity, Species Compo sition and Collision Mortality  

Science Conference Proceedings (OSTI)

During avian monitoring studies conducted from 1994-1999, several bat collision victims were found at wind turbines in the Buffalo Ridge Resource Area (WRA) in southwest Minnesota. This study further examined bat interactions with wind turbines at this site.

2003-11-05T23:59:59.000Z

205

Tennessee Valley Authority Buffalo Mountain Wind Power Project Development: U.S. Department of Energy - EPRI Wind Turbine Verificati on Program  

Science Conference Proceedings (OSTI)

This report describes the development experience at the Tennessee Valley Authority (TVA) Buffalo Mountain Wind Power Project located near Oliver Springs, Tennessee. The lessons learned from the project will be valuable to other utilities or companies planning similar wind projects.

2003-03-24T23:59:59.000Z

206

EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Grande Ronde Basin Endemic Spring Chinook Salmon 3: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon SUMMARY This EA evaluates the environmental impacts for the U.S. Department of Energy Bonneville Power Administration's proposal to fund a program designed to prevent the extinction and begin the recovery of spring Chinook salmon stocks in the Grande Ronde River Basin in the Upper Grande Ronde River, Lostine River, and Catherine Creek in Northeastern Oregon. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 18, 2003 EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program

207

City of Grand Rapids - Green Building Requirements for Municipal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement...

208

DOE - Office of Legacy Management -- Grand Junction Sites  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

209

Statement by Energy Secretary Steven Chu on Today's Grand Opening...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu issued the following statement on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. The facility was supported with funding from the...

210

Rio Grande Rift Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Rift Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Rio Grande Rift Geothermal Region edit Details Areas (21) Power Plants (0) Projects (2)...

211

SunShot Grand Challenge Highlights Ambitious Efforts along the...  

NLE Websites -- All DOE Office Websites (Extended Search)

startups. Secretary Chu also announced a nationwide competition to drive down the cost of rooftop solar energy system. The SunShot Grand Challenge: Summit and Technology Forum...

212

City of Grand Rapids- Green Building Requirements for Municipal Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement the principles...

213

Grand River Dam Authority | Open Energy Information  

Open Energy Info (EERE)

Dam Authority Dam Authority Jump to: navigation, search Name Grand River Dam Authority Place Oklahoma Utility Id 7490 Utility Location Yes Ownership S NERC Location SPP NERC SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png general service Commercial general service commercial Commercial large general servic time of use distributional Commercial

214

Vehicle Technologies Office: EV Everywhere Grand Challenge  

NLE Websites -- All DOE Office Websites (Extended Search)

Challenge Challenge With their immense potential for increasing the country's energy, economic, and environmental security, plug-in hybrid electric and all-electric vehicles (also known as plug-in electric vehicles, or PEVs) will play a key role in the country's transportation future. In fact, transitioning to electric drive vehicles (including hybrid-electric) could reduce U.S. oil dependence by more than 80% and greenhouse gas emissions by more than 60%. The EV Everywhere Grand Challenge focuses on the U.S. becoming the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years. To learn more about electric vehicles, see our Plug-in Electric Vehicle Basics page. To help meet the EV Everywhere goals, the Vehicle Technologies Office supports efforts in a variety of areas:

215

Grand Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Electric Coop, Inc Electric Coop, Inc Jump to: navigation, search Name Grand Electric Coop, Inc Place South Dakota Utility Id 7484 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Heat Rate Commercial Farm and Residential Electric Heat Rate Residential Metered Security Light - 100 HPS Lighting Metered Security Light - 175 MV Lighting Metered Security Light - 250 HPS Lighting Metered Security Light - 400 MV Lighting Schedule A - Farm and Residential Residential Schedule ADF -Du al Fuel Service Residential

216

Panel on grand challenges for modeling and simulation  

Science Conference Proceedings (OSTI)

It has been a decade since the Workshop on Grand Challenge for Modeling & Simulation (M&S) was held at Dagstuhl in Germany (www.dagstuhl.de/02351). Grand challenges provide a critical focal point for research and development and can potentially create ...

Simon J. E. Taylor; Richard Fujimoto; Ernest H. Page; Paul A. Fishwick; Adelinde M. Uhrmacher; Gabriel Wainer

2012-12-01T23:59:59.000Z

217

DOE - Office of Legacy Management -- American Machine and Foundry Co -  

NLE Websites -- All DOE Office Websites (Extended Search)

Buffalo - NY 63 Buffalo - NY 63 FUSRAP Considered Sites Site: American Machine and Foundry Co - Buffalo (NY.63 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: AMF NY.63-1 Location: Buffalo , New York NY.63-1 Evaluation Year: 1990 NY.63-1 Site Operations: Design engineering for the development of electrical and mechanical controls. NY.63-1 Site Disposition: Eliminated - Potential for radioactive contamination considered remote. Radioactive material, if any was used at the site, would have been limited to test quantities. NY.63-2 Radioactive Materials Handled: None Indicated - test quantities, if any NY.63-1 Primary Radioactive Materials Handled: None Indicated, But Could Have Included Test Quantities of Finished Uranium Metal NY.63-1

218

The Particle Adventure | Unsolved Mysteries | Forces and the Grand Unified  

NLE Websites -- All DOE Office Websites (Extended Search)

Unsolved Mysteries - Forces and the Grand Unified Theory Unsolved Mysteries - Forces and the Grand Unified Theory Forces and the Grand Unified Theory Physicists hope that a Grand Unified Theory will unify the strong, weak, and electromagnetic interactions. There have been several proposed Unified Theories, but we need data to pick which, if any, of these theories describes nature. If a Grand Unification of all the interactions is possible, then all the interactions we observe are all different aspects of the same, unified interaction. However, how can this be the case if strong and weak and electromagnetic interactions are so different in strength and effect? Strangely enough, current data and theory suggests that these varied forces merge into one force when the particles being affected are at a high enough energy.

219

Grand Challenges | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Grand Challenges Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Basic Research Needs Grand Challenges Science Highlights News & Events Publications Contact BES Home Research Grand Challenges Print Text Size: A A A RSS Feeds FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored workshops that began in 2001. Over and over, the recommendations from these workshops described similar themes that in this new era of science, we would design, discover, and synthesize new materials and molecular assemblies through atomic scale control; probe and control photon, phonon, electron, and ion interactions

220

EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-A and PP-33-1 Rio Grande Electric Cooperative, Inc. EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. Order authorizing Rio Grande Electric Cooperative, Inc to export...

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data Compendium for the Logging Test Pits at the ERDA Grand Junction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound (December 1975) Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound...

222

EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Facility Operations at the U.S. DOE Grand Junction 30: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD June 8, 1996 EA-0930: Finding of No Significant Impact Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand

223

Thermomechanical models of the Rio Grande rift  

SciTech Connect

Fully two-dimensional, coupled thermochemical solutions of a continental rift and platform are used to model the crust and mantle structure of a hot, buoyant mantle diapir beneath the Rio Grande rift. The thermomechanical model includes both linear and nonlinear laws of the Weertman type relating shear stress and creep strain rate, viscosity which depends on temperature and pressure, and activation energy, temperature-dependent thermal conductivity, temperature-dependent coefficient of thermal expansion, the Boussinesq approximation for thermal bouyancy, material convection using a stress rate that is invariant to rigid rotations, an elastically deformable crust, and a free surface. The model determines the free surface velocities, solid state flow field in the mantle, and viscosity structure of lithosphere and asthenosphere. Regional topography and crustal heat flow are simulated. A suite of symmetric models, assumes continental geotherms on the right and the successively increasing rift geotherms on the left. These models predict an asthenospheric flow field which transfers cold material laterally toward the rift at > 300 km, hot, buoyant material approx. 200 km wide which ascends vertically at rates of 1 km/my between 175 to 325 km, and spreads laterally away from the rift at the base of the lithosphere. Crustal spreading rates are similar to uplift rates. The lithosphere acts as stiff, elastic cap, damping upward motion through decreased velocities of 1 km/10 my and spreading uplift laterally. A parameter study varying material coefficients for the Weertman flow law suggests asthenospheric viscosities of approx. 10/sup 22/ to 10/sup 23/ poise. Similar studies predict crustal viscosities of approx. 10/sup 25/ poise. The buoyant process of mantle flow narrows and concentrates heat transport beneath the rift, increases upward velocity, and broadly arches the lithosphere. 10 figures, 1 table.

Bridwell, R.J.; Anderson, C.A.

1980-01-01T23:59:59.000Z

224

Rig 'dzin Tshe dbang mchog grub (1761-1829) et la constitution du rNying ma rgyud 'bum de sDe dge  

E-Print Network (OSTI)

les textes en une collection Ug palung, le fief de la ligne Zur3. Un article plus rcent encore de Mi Nyag Thubbstan chos dar fait le point sur les diverses versions existantes, mentionnantdailleurs un certain nombre dentre elles qui ne sont... and the Bai-ro- rgyud-bum, p. 9. 4 Mi nyag Thub bstan chos dar, rNying ma rgyud 'bum gyi mtshams sbyor, passim. 5 Voir Achard, La liste des Tantras du rNying mai rgyud bum selon ldition tablie par Kun mkhyen Jigs med gling pa, Revue d...

Achard, Jean-Luc

2003-01-01T23:59:59.000Z

225

DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awardees for the Industrial Energy Efficiency Grand Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational industrial processes and technologies that can significantly reduce greenhouse gas emissions throughout the industrial sector. The funding will be matched by more than $5 million in private industry funding to support a total of $18 million in projects that will enhance America's energy security and strengthen our economy.

226

Grand Blanc Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Grand Blanc Generating Station Biomass Facility Grand Blanc Generating Station Biomass Facility Jump to: navigation, search Name Grand Blanc Generating Station Biomass Facility Facility Grand Blanc Generating Station Sector Biomass Facility Type Landfill Gas Location Genesee County, Michigan Coordinates 43.0777289°, -83.6773928° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0777289,"lon":-83.6773928,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

227

EA-1037: Uranium Lease Management Program, Grand Junction, Colorado |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Uranium Lease Management Program, Grand Junction, Colorado 37: Uranium Lease Management Program, Grand Junction, Colorado EA-1037: Uranium Lease Management Program, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of domestic uranium and vanadium ores, to maintain a viable domestic mining and milling infrastructure required to produce and mill these ores, and to provide assurance of a fair monetary return to the U.S. Government. The Uranium Lease Management Program gives The Department of Energy the flexibility to continue leasing these lands. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 22, 1995

228

DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Awardees for the Industrial Energy Efficiency Grand Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational industrial processes and technologies that can significantly reduce greenhouse gas emissions throughout the industrial sector. The funding will be matched by more than $5 million in private industry funding to support a total of $18 million in projects that will enhance America's energy security and strengthen our economy.

229

SunShot Grand Challenge Summit 2014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Grand Challenge Summit 2014 SunShot Grand Challenge Summit 2014 SunShot Grand Challenge Summit 2014 May 19, 2014 8:00AM PDT to May 22, 2014 5:00PM PDT Anaheim, California Hilton Anaheim The DOE SunShot Initiative Grand Challenge Summit 2014 will bring together more than 800 members of the solar community including SunShot-funded project teams, industry leaders, innovative researchers and scientists, and local, state and federal government policymakers to review the progress made and discuss the challenges ahead to make solar energy more affordable and widespread across America. The event will include activities that celebrate the accomplishments across more than 250 SunShot-funded projects and discuss the path forward for the U.S. solar energy industry. Plenary Sessions and Keynote Speakers - Top leaders from business,

230

Saft America Advanced Batteries Plant Celebrates Grand Opening in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Saft America Advanced Batteries Plant Celebrates Grand Opening in Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 - 12:30pm Addthis Department of Energy Investment Helps Support Job Creation, U.S. Economic Competitiveness and Advanced Vehicle Industry WASHINGTON, D.C. - Today, Secretary Steven Chu joined with Saft America to announce the grand opening of the company's Jacksonville, Florida, factory, which will produce advanced lithium-ion batteries to power electric vehicles and other applications. Saft America estimates it will create nearly 280 permanent jobs at the factory, and the city of Jacksonville expects an additional 800 indirect jobs to be created within its community. The project has created or preserved an estimated 300

231

Alpine Extensional Detachment Tectonics In The Grande Kabylie Metamorphic  

Open Energy Info (EERE)

Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Alpine Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Details Activities (0) Areas (0) Regions (0) Abstract: The Maghrebides are part of the peri-Mediterranean Alpine orogen. They expose in their inner zone inliers of high-grade crystalline rocks surrounded by Oligo-Miocene and younger Miocene cover. Detailed mapping coupled with structural and petrological investigations in the Grande Kabylie massif, and the reinterpretation of the available geochronological data, allow us to refute the traditional concept of rigid behaviour of this

232

Empowering First Year Students by Immersion in a 'Grand Challenges'  

Science Conference Proceedings (OSTI)

Apr 19, 2010 ... Interestingly, this preceded the National Academy of Engineering Grand ... Within their lifetime they will witness burgeoning needs in energy resources, ... to statistics, environmental studies, to history and philosophyin...

233

SunShot Grand Challenge Highlights Ambitious Efforts along the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary Chu also announced a nationwide competition to drive down the cost of rooftop solar energy system. The SunShot Grand Challenge: Summit and Technology Forum kicked off in...

234

Vehicle Technologies Office: EV Everywhere Grand Challenge: DOE...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE's 10-Year Vision for Plug-in Electric Vehicles to someone by E-mail Share Vehicle Technologies Office: EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in...

235

Wintertime Boundary Layer Structure in the Grand Canyon  

Science Conference Proceedings (OSTI)

Wintertime temperature profiles in the Grand Canyon exhibit a neutral to isothermal stratification during both daytime and nighttime, with only rare instances of actual temperature inversions. The canyon warms during daytime and cools during ...

C. David Whiteman; Shiyuan Zhong; Xindi Bian

1999-08-01T23:59:59.000Z

236

Cambridge Grand Junction transit implementation : alternatives, scheduling, cost, and performance  

E-Print Network (OSTI)

The Grand Junction railroad lies at the heart of East Cambridge adjacent to the Kendall Square business district and the Massachusetts Institute of Technology campus. Over the last one hundred years the railroad has gone ...

Iglesias Cuervo, Jesus

2012-01-01T23:59:59.000Z

237

Microsoft Word - GrandCoulee_FinalEA_CommentResponses.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1679 December 2011 Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Revision Sheet for the Environmental Assessment 2 SUMMARY This revision sheet documents the changes to be incorporated into the Grand Coulee's Third Powerplant 500-kilovolt (kV) Transmission Line Replacement Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On May 2, 2011, the Preliminary EA was sent to agencies and interested parties.

238

Interactions between Copper(II) Complexes of Mono-, Bis-, and Tris(macrocyclic) Ligands and Inorganic or Organic Guests  

E-Print Network (OSTI)

] Department of Chemistry, State University of New York, College at Buffalo, 1300 Elmwood Ave, Buffalo, NY-N,N -(2-aminoethyl)propane-1,3-diamine] with formaldehyde and melamine (melamine = 2,4,6-tri- amino-1

Nazarenko, Alexander

239

ACEEE Summer Study on Energy in Industry, West Point, NY, July 19-22. 1 Benchmarking Approaches: An Alternate Method to Determine Best  

E-Print Network (OSTI)

ACEEE Summer Study on Energy in Industry, West Point, NY, July 19-22. 1 Benchmarking Approaches: An Alternate Method to Determine Best Practice by Examining Plant-Wide Energy Signatures Yogesh Patil and John Seryak, Energy & Resource Solutions, Inc. Kelly Kissock, University of Dayton ABSTRACT Baselining

Kissock, Kelly

240

U.S. Liquefied Natural Gas Exports To Brazil  

Annual Energy Outlook 2012 (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to...

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DOE Office of Nuclear Energy Transportation Planning, Route Selection, and Rail Issues  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Judith Holm, Alex Thrower, Mark Abkowitz, and Tim Runyon for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

242

Communication Is Key to Packaging and Transportation Safety and Compliance  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Steve O'Connor for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY

243

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Messick for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. http:energy.govemdownloadsus-global-threat-reduction-initiativeus-origin-nuclear-fuel-remova...

244

Status Update: Extended Storage and Transportation Waste Confidence  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by David W. Pstrak for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

245

Transportation Security Rulemaking Activities  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by R. Clyde Ragland for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

246

TEPP Radiation Specialist Course  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by J. Curt Pendergrass for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

247

West Valley Demonstration Project: A Short History and Status  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Bryan C. Bower for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

248

Western New York Nuclear Service Center: Geology Overview  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Paul J. Bembia for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

249

Western New York Nuclear Service Center: History  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Paul J. Bembia for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY

250

Keynote Address: Update on Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Keynote presentation made by David G. Huizenga for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

251

West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Raymond C. Vaughan for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY.

252

Microsoft Word - CX-GrandCoulee-Creston_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Robert Keudell Robert Zeller Lineman Foreman III - TFWK-Grand Coulee Lineman Foreman I - TFWK-Grand Coulee Proposed Action: Selected wood pole replacement and minor access road maintenance along the Grand Coulee-Creston transmission line at miles 14, 15, 21 and 28. PP&A Project No: 1828 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures... in a condition suitable for a facility to be used for its designed purpose.

253

Grand Ridge Elementary Wind Project | Open Energy Information  

Open Energy Info (EERE)

Grand Ridge Elementary Wind Project Grand Ridge Elementary Wind Project Facility Grand Ridge Elementary Sector Wind energy Facility Type Community Wind Location WA Coordinates 47.545883°, -122.005714° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.545883,"lon":-122.005714,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

254

Fernald Preserve Visitors Center Grand Opening and LEED Platinum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Preserve Visitors Center Grand Opening and LEED Platinum Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to do three things here at Fernald: to close it, to clean it up and to give it back to the community. I'm proud to say we have fulfilled that commitment safely and ahead of schedule. Less than two years ago, I was here with Secretary Bodman as he announced the completion of a $4.4 billion clean up operation. Since then, we have

255

Grand Marais PUC - Residential Energy Efficiency Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Marais PUC - Residential Energy Efficiency Rebate Program Grand Marais PUC - Residential Energy Efficiency Rebate Program Grand Marais PUC - Residential Energy Efficiency Rebate Program < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount CFLs: $2/bulb or up to 50% of cost LEDs: $10 - $15/bulb Lighting Fixtures: $15 - $20/fixture Refrigerators: $25, plus $50 for recycling an old, working unit Freezers: $25, plus $50 for recycling an old, working unit Dishwashers: $25 Clothes Washers: $50 Dehumidifiers: $65 Room A/C: $25, plus $25 for recycling an old, working unit Central A/C: $100 - $200, plus additional rebate for efficiency ratings

256

GreenHunter Biodiesel Refinery Grand Opening | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer Today, Acting Deputy Secretary Jeffrey Kupfer delivered remarks at the launch of GreenHunter Energy's biodiesel refinery, which will be the nation's single largest biodiesel refinery, producing 105 million gallons of "white-water" B100 biodiesel per year. Thank you Gary. I'm pleased to join with Governor Perry, Congressmen Green and Lampson, and Mayor Garcia in celebrating this important occasion. Today, as we open the nation's largest biodiesel refinery, we reach another milestone in our effort to make America more energy secure. As you know, global energy demand is surging. We must act swiftly and aggressively to

257

Fernald Preserve Visitors Center Grand Opening and LEED Platinum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Preserve Visitors Center Grand Opening and LEED Platinum Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to do three things here at Fernald: to close it, to clean it up and to give it back to the community. I'm proud to say we have fulfilled that commitment safely and ahead of schedule. Less than two years ago, I was here with Secretary Bodman as he announced the completion of a $4.4 billion clean up operation. Since then, we have

258

Moreau-Grand Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Moreau-Grand Electric Coop Inc Moreau-Grand Electric Coop Inc Jump to: navigation, search Name Moreau-Grand Electric Coop Inc Place South Dakota Utility Id 12915 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO Other Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Industrial Small General Service Single Phase Commercial Small General Service Single Phase Well Commercial Small General Service Three Phase Commercial Average Rates Residential: $0.1090/kWh Commercial: $0.0798/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

259

City of Grand Junction, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Junction City of Grand Junction City of Place Iowa Utility Id 7486 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Commercial Demand Service Commercial Residential Eletric Residential Average Rates Residential: $0.1340/kWh Commercial: $0.1300/kWh Industrial: $0.0899/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Grand_Junction,_Iowa_(Utility_Company)&oldid=409673

260

Mutagenic potential of sediments from the Grand Calumet River  

Science Conference Proceedings (OSTI)

The Grand Calumet River/Indiana Harbor Canal is one of the International Joint Commission's Great Lakes Areas of Concern (AOC). Like many other AOCs, the Grand Calumet River is in a heavily industrialized area and has a history of chemical contamination. Many of the chemicals found in the industrial and municipal wastes that enter the waterway end up in sediment where they are concentrated to high levels. In order to assess the potential genotoxicity of sediments from the Grand Calumet River, the authors determined the mutagenic potential of organic extracts of sediments. The sediment extracts were assayed in the Salmonella/microsome mutagenicity test. In the Ames test, all ten sediment samples assayed were found to be mutagenic. In general, chemicals found in the sediments required metabolic activation before a positive mutagenic response was observed.

Maccubbin, A.E.; Ersing, N. (Roswell Park Cancer Inst., Buffalo, NY (United States))

1991-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Winners Announced for the NNSA Grand Challenge Competition | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Winners Announced for the NNSA Grand Challenge Competition Winners Announced for the NNSA Grand Challenge Competition Winners Announced for the NNSA Grand Challenge Competition December 11, 2013 - 1:23pm Addthis President Carlton Brown of Clark Atlanta University pictured here with winning students junior Jules Henry (Electrical Engineering/Computer Science) and sophomore KeAndra Goodman (Electrical Engineering/Physics). President Carlton Brown of Clark Atlanta University pictured here with winning students junior Jules Henry (Electrical Engineering/Computer Science) and sophomore KeAndra Goodman (Electrical Engineering/Physics). Annie Whatley Annie Whatley Deputy Director, Office of Minority Economic Impact The first year of the Minority Serving Institution Partnership Program with the Department of Energy site Kansas City Plant was a fruitful one. The two

262

Designing the perfect plant feedstock for biofuel production: Using the whole buffalo to diversify fuels and products  

NLE Websites -- All DOE Office Websites (Extended Search)

ÔØ Å ÒÙ× Ö ÔØ ÔØ Å ÒÙ× Ö ÔØ Designing the perfect plant feedstock for biofuel production: Using the whole buffalo to diversify fuels and products B.L. Joyce, C.N. Stewart Jr. PII: S0734-9750(11)00138-8 DOI: doi: 10.1016/j.biotechadv.2011.08.006 Reference: JBA 6469 To appear in: Biotechnology Advances Received date: 21 April 2011 Revised date: 6 July 2011 Accepted date: 4 August 2011 Please cite this article as: Joyce BL, Stewart Jr. CN, Designing the perfect plant feed- stock for biofuel production: Using the whole buffalo to diversify fuels and products, Biotechnology Advances (2011), doi: 10.1016/j.biotechadv.2011.08.006 This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting

263

Grand Symmetry, Spectral Action, and the Higgs mass  

E-Print Network (OSTI)

In the context of the spectral action and the noncommutative geometry approach to the standard model, we build a model based on a larger symmetry. The latter satisfies all the requirements to have a noncommutative manifold, and mixes gauge and spin degrees of freedom without introducing extra fermions. With this "grand symmetry" it is natural to have the scalar field necessary to obtain the Higgs mass in the vicinity of 126 GeV. Requiring the noncommutative space to be an almost commutative geometry (i.e. the product of manifold by a finite dimensional internal space) gives conditions for the breaking of this grand symmetry to the standard model.

Agostino Devastato; Fedele Lizzi; Pierre Martinetti

2013-04-01T23:59:59.000Z

264

The verifying compiler: A grand challenge for computing research  

Science Conference Proceedings (OSTI)

This contribution proposes a set of criteria that distinguish a grand challenge in science or engineering from the many other kinds of short-term or long-term research problems that engage the interest of scientists and engineers. As an example drawn ...

Tony Hoare

2003-01-01T23:59:59.000Z

265

The verifying compiler: a grand challenge for computing research  

Science Conference Proceedings (OSTI)

I propose a set of criteria which distinguish a grand challenge in science or engineering from the many other kinds of short-term or long-term research problems that engage the interest of scientists and engineers. As an example drawn from Computer Science, ...

Tony Hoare

2003-04-01T23:59:59.000Z

266

Workshop and conference on Grand Challenges applications and software technology  

SciTech Connect

On May 4--7, 1993, nine federal agencies sponsored a four-day meeting on Grand Challenge applications and software technology. The objective was to bring High-Performance Computing and Communications (HPCC) Grand Challenge applications research groups supported under the federal HPCC program together with HPCC software technologists to: discuss multidisciplinary computational science research issues and approaches, identify major technology challenges facing users and providers, and refine software technology requirements for Grand Challenge applications research. The first day and a half focused on applications. Presentations were given by speakers from universities, national laboratories, and government agencies actively involved in Grand Challenge research. Five areas of research were covered: environmental and earth sciences; computational physics; computational biology, chemistry, and materials sciences; computational fluid and plasma dynamics; and applications of artificial intelligence. The next day and a half was spent in working groups in which the applications researchers were joined by software technologists. Nine breakout sessions took place: I/0, Data, and File Systems; Parallel Programming Paradigms; Performance Characterization and Evaluation of Massively Parallel Processing Applications; Program Development Tools; Building Multidisciplinary Applications; Algorithm and Libraries I; Algorithms and Libraries II; Graphics and Visualization; and National HPCC Infrastructure.

1993-12-31T23:59:59.000Z

267

DOE/EA-1631: Final Environmental Assessment for Department of Energy Loan Guarantee for Beacon Power Corporation Frequency Regulation Facility in Stephentown, NY (February 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 31 Environmental Assessment for DEPARTMENT OF ENERGY LOAN GUARANTEE FOR BEACON POWER CORPORATION FREQUENCY REGULATION FACILITY IN STEPHENTOWN, N.Y. U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 February 2009 FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment for Department of Energy Loan Guarantee for Beacon Power Corporation Frequency Regulation Facility in Stephentown, N.Y. DOE/EA-1631 TABLE OF CONTENTS LIST OF ACRONYMS iii 1.0 PURPOSE AND NEED 1 1.1 Introduction 1 1.2 Purpose and Need for Agency Action 1 2.0 DESCRIPTION OF PROPOSED ACTION AND NO ACTION ALTERNATIVE 3 2.1 Location 3 2.2 Proposed Action 3 2.2.1 Flywheel 3 2.2.2 Project Elements 4 2.2.3 Project Systems 5 2.2.4 Construction

268

EA-1338: Transfer of the Department of Energy Grand Junction Office to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Transfer of the Department of Energy Grand Junction Office 8: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado SUMMARY This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 25, 2000 EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 25, 2000 EA-1338: Final Environmental Assessment Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership

269

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor  

E-Print Network (OSTI)

Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line for commuter rail service. In addition the Grand Junction ...

Bockelie, Adam

2012-01-01T23:59:59.000Z

270

PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-1 and EA-33-A Rio Grande Electric Cooperative Inc PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc Rescission of Presidential Permit and Electricity Export Authorization...

271

Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar  

DOE Green Energy (OSTI)

Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

Suzanne McSawby, Project Director

2008-12-31T23:59:59.000Z

272

The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline  

E-Print Network (OSTI)

The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline D.W. (Don) Wilson, Director, North Atlantic Pipeline Partners, L.P. NOIA 2000 Conference June, 2000 #12;Grand Banks Multi-Purpose Pipeline Route January 2000 Grand Banks of Newfoundland Newfoundland Come by Chance St. John's Argentia 50o

Bruneau, Steve

273

A New Species of Parodia (Cactaceae, Notocacteae) from Rio Grande do Sul, Brazil  

E-Print Network (OSTI)

A New Species of Parodia (Cactaceae, Notocacteae) from Rio Grande do Sul, Brazil Marlon C. Machado Grande do Sul, Brazil. jlarocca@unisinos.br ABSTRACT . A new species, Parodia gaucha M. Machado & Larocca (Cactaceae, Notocacteae), from Encruzilhada do Sul, Rio Grande do Sul, Brazil, is described and illustrated

Zürich, Universität

274

Grand Forks, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Grand Forks, North Dakota: Energy Resources Grand Forks, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.9252568°, -97.0328547° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.9252568,"lon":-97.0328547,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

275

GIS Data from LANL's Cerro Grande Rehabilitation Project (CGRP)  

DOE Data Explorer (OSTI)

The Los Alamos National Laboratorys Cerro Grande Rehabilitation Project (CGRP) involves many subprojects. One of them is a geographic information system for electronically storing and displaying geographically-related data about the fires effects. The data are used for research, planning, emergency response, and for informing the public. This website provides access to geospatial data relating to the May 2000 Cerro Grande Fire. This includes data generated by the Burned Area Emergency Rehabilitation (BAER) Team during and shortly after the fire as well as data resulting from the ongoing environmental monitoring programs related to the fire. These data are available from a data catalog in two forms: (i) direct download of individual geospatial files and (ii) image files.

276

East Grand St Bridge Snowmelt Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Bridge Snowmelt Low Temperature Geothermal Facility Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East Grand St Bridge Sector Geothermal energy Type Snowmelt Location Laramie, Wyoming Coordinates 41.3113669°, -105.5911007° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

277

Grand Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Grand Ridge II Wind Farm Facility Grand Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

278

City of Grand Island, Nebraska (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Island City of Grand Island City of Place Nebraska Utility Id 40606 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes RTO SPP Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Flood Lighting Lighting Commercial Rate- Single Phase Commercial Commercial Rate- Three Phase Commercial Residential Rate Residential Three Phase Power Service Industrial

279

City of Grand Haven, Michigan (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Grand Haven Grand Haven Place Michigan Utility Id 7483 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Space Lighting Service - 100 Watt Lighting Area Space Lighting Service - 1000 Watt Lighting Area Space Lighting Service - 175 Watt Mercury Vapor Lighting Area Space Lighting Service - 400 Watt Mercury Vapor Lighting Area Space Lighting Service - Metal Halide 175 Watt Lighting

280

Arroyo Grande, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Arroyo Grande, California: Energy Resources Arroyo Grande, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.1185868°, -120.5907252° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1185868,"lon":-120.5907252,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Rio Grande Electric Coop, Inc (New Mexico) | Open Energy Information  

Open Energy Info (EERE)

New Mexico) New Mexico) Jump to: navigation, search Name Rio Grande Electric Coop, Inc Place New Mexico Utility Id 16057 References EIA Form EIA-861 Final Data File for 2010 - File2_2010[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.1560/kWh Commercial: $0.1630/kWh Industrial: $0.1170/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File2_2010" Retrieved from "http://en.openei.org/w/index.php?title=Rio_Grande_Electric_Coop,_Inc_(New_Mexico)&oldid=412780" Categories: EIA Utility Companies and Aliases Utility Companies Organizations Stubs What links here

282

City of Grand Rapids Building Solar Roof Demonstration  

SciTech Connect

Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

DeClercq, Mark; Martinez, Imelda

2012-08-31T23:59:59.000Z

283

Volume terms for charged colloids: a grand-canonical treatment  

E-Print Network (OSTI)

We present a study of thermodynamic properties of suspensions of charged colloids on the basis of linear Poisson-Boltzmann theory. We calculate the effective Hamiltonian of the colloids by integrating out the ionic degrees of freedom grand-canonically. This procedure not only yields the well-known pairwise screened-Coulomb interaction between the colloids, but also additional volume terms which affect the phase behavior and the thermodynamic properties such as the osmotic pressure. These calculations are greatly facilitated by the grand-canonical character of our treatment of the ions, and allow for relatively fast computations compared to earlier studies in the canonical ensemble. Moreover, the present derivation of the volume terms are relatively simple, make a direct connection with Donnan equilibrium, yield an explicit expression for the effective screening constant, and allow for extensions to include, for instance, nonlinear effects.

Bas Zoetekouw; Rene van Roij

2005-10-10T23:59:59.000Z

284

Chattanooga Eagle Ford Rio Grande Embayment Texas- Louisiana-  

U.S. Energy Information Administration (EIA) Indexed Site

Rio Grande Rio Grande Embayment Texas- Louisiana- Mississippi Salt Basin Uinta Basin Appa lachia n Basin Utica Marcellus Devonian (Ohio) Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville Hermosa Mancos Pierre Conasauga Woodford- Caney Pearsall- Eagle Ford Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Maverick Sub-Basin Montana Thrust Belt Marfa Basin Valley and Ridge Province Arkoma Basin Forest City Basin Piceance Basin Shale Gas Plays, Lower 48 States 0 200 400 100 300 Miles ± Source: Energy Information Administration based on data from various published studies

285

Field Studies of Geothermal Reservoirs Rio Grande Rift, New Mexico  

DOE Green Energy (OSTI)

The Rio Grande rift provides an excellent field laboratory to study the nature of geothermal systems in an extensional environment. Much of the geologic complexity that is found in the Basin and Range is absent because the rift is located on cratonic crust with a thin and well-characterized Phanerozoic stratigraphy and tectonic history. On the other hand, the Neogene thermo-tectonic history of the rift has many parallels with the Basin and Range to the west. The geology of the southern Rio Grande rift is among the best characterized of any rift system in the world. Also, most geologic maps for the region are rather unique in that detailed analyses of Quaternary stratigraphic and surficial unit are added in concert with the details of bedrock geology. Pleistocene to Holocene entrenchment of the Rio Grande and tributaries unroofs the alteration signatures and permeability attributes of paleo outflow plumes and upflow zones, associated with present-day, but hidden or ''blind,'' hydrothermal systems at Rincon and San Diego Mountain.

James C Witcher

2002-07-30T23:59:59.000Z

286

Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado  

SciTech Connect

The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1996-06-01T23:59:59.000Z

287

Program on Technology Innovation: Oxy-Fired CFB with CO2 Capture and Storage at Jamestown (NY) Board of Public Utilities  

Science Conference Proceedings (OSTI)

Oxy-combustion of coal has been proposed as a way of reducing the costs of capturing CO2 (at a purity sufficient for geological storage) from coal-fired steam-electric power plants. To date, only lab and test-stand studies have been conducted, focusing primarily on the combustion process. The next major development step is to field an integrated oxy-coal power plant. Such a project has been proposed and is being developed for deployment at the Jamestown (NY) Board of Public Utilities (BPU) Carlson Genera...

2009-05-15T23:59:59.000Z

288

UMTRA project water sampling and analysis plan, Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

Surface remedial action will be completed at the Grand Junction processing site during the summer of 1994. Results of 1993 water sampling indicate that ground water flow conditions and ground water quality at the processing site have remained relatively constant with time. Uranium concentrations in ground water continue to exceed the maximum concentration limits, providing the best indication of the extent of contaminated ground water. Evaluation of surface water quality of the Colorado River indicate no impact from uranium processing activities. No compliance monitoring at the Cheney disposal site has been proposed because ground water in the Dakota Sandstone (uppermost aquifer) is classified as limited-use (Class 111) and because the disposal cell is hydrogeologically isolated from the uppermost aquifer. The following water sampling and water level monitoring activities are planned for calendar year 1994: (i) Semiannual (early summer and late fall) sampling of six existing monitor wells at the former Grand Junction processing site. Analytical results from this sampling will be used to continue characterizing hydrogeochemical trends in background ground water quality and in the contaminated ground water area resulting from source term (tailings) removal. (ii) Water level monitoring of approximately three proposed monitor wells projected to be installed in the alluvium at the processing site in September 1994. Data loggers will be installed in these wells, and water levels will be electronically monitored six times a day. These long-term, continuous ground water level data will be collected to better understand the relationship between surface and ground water at the site. Water level and water quality data eventually will be used in future ground water modeling to establish boundary conditions in the vicinity of the Grand Junction processing site. Modeling results will be used to help demonstrate and document the potential remedial alternative of natural flushing.

Not Available

1994-07-01T23:59:59.000Z

289

Gravitational Collapse and Radiation of Grand Unified Theory  

E-Print Network (OSTI)

The infinite gravitational collapse of any supermassive stars should pass through an energy scale of the grand unified theory (GUT). After nucleon-decays, the supermassive star will convert nearly all its mass into energy, and produce the radiation of GUT. It may probably explain some ultrahigh energy puzzles in astrophysics, for example, quasars and gamma-ray bursts (GRB), etc. This is similar with a process of the Big Bang Universe with a time-reversal evolution in much smaller space scale and mass scale. In this process the star seems be a true white hole.

Yi-Fang Chang

2007-10-02T23:59:59.000Z

290

Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

2001-04-01T23:59:59.000Z

291

Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.  

DOE Green Energy (OSTI)

Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

Patterson, Scott

2009-04-10T23:59:59.000Z

292

U.S. Natural Gas Exports to Portugal  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

293

U.S. Liquefied Natural Gas Exports to Spain  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

294

U.S. Liquefied Natural Gas Exports to United Kingdom  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

295

U.S. Natural Gas Exports to Chile  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

296

U.S. Liquefied Natural Gas Exports To Brazil  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

297

U.S. LNG Imports from Canada  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

298

U.S. Liquefied Natural Gas Exports to India  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

299

U.S. Liquefied Natural Gas Exports to Japan  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

300

U.S. Natural Gas Exports to Mexico  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

U.S. Natural Gas Exports to Russia  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

302

SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Grand Challenge Highlights Ambitious Efforts along the SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Ramamoorthy Ramesh Former Director, SunShot Initiative & Solar Energy Technologies Program What are the key facts? Today at the SunShot Grand Challenge Summit Energy Secretary Chu announced up to $8 million to support clean energy startups. Secretary Chu also announced a nationwide competition to drive down

303

A Grand Delta(96) x SU(5) Flavour Model  

E-Print Network (OSTI)

Recent results from the Daya Bay and RENO reactor experiments have measured the smallest lepton mixing angle and found it to have a value of theta_13 approximately 9 degrees. This result presents a new challenge for the existing paradigms of discrete flavour symmetries which attempt to describe all quark and lepton masses and mixing angles. Here we propose a Supersymmetric Grand Unified Theory of Flavour based on Delta(96) x SU(5), together with a U(1) x Z3 symmetry, including a full discussion of Delta(96) in a convenient basis. The Grand Delta(96) x SU(5) Flavour Model relates the quark mixing angles and masses in the form of the Gatto-Sartori-Tonin relation and realises the Georgi-Jarlskog mass relations between the charged leptons and down-type quarks. We predict a Bi-trimaximal (not Tri-bimaximal) form of neutrino mixing matrix, which, after including charged lepton corrections with zero phase, leads to the following GUT scale predictions for the atmospheric, solar, and reactor mixing angles: theta_23=36...

King, Stephen F; Stuart, Alexander J

2012-01-01T23:59:59.000Z

304

A Grand Delta(96) x SU(5) Flavour Model  

E-Print Network (OSTI)

Recent results from the Daya Bay and RENO reactor experiments have measured the smallest lepton mixing angle and found it to have a value of theta_13 approximately 9 degrees. This result presents a new challenge for the existing paradigms of discrete flavour symmetries which attempt to describe all quark and lepton masses and mixing angles. Here we propose a Supersymmetric Grand Unified Theory of Flavour based on Delta(96) x SU(5), together with a U(1) x Z3 symmetry, including a full discussion of Delta(96) in a convenient basis. The Grand Delta(96) x SU(5) Flavour Model relates the quark mixing angles and masses in the form of the Gatto-Sartori-Tonin relation and realises the Georgi-Jarlskog mass relations between the charged leptons and down-type quarks. We predict a Bi-trimaximal (not Tri-bimaximal) form of neutrino mixing matrix, which, after including charged lepton corrections with zero phase, leads to the following GUT scale predictions for the atmospheric, solar, and reactor mixing angles: theta_23=36.9 degrees, theta_12=32.7 degrees and theta_13=9.6 degrees, in good agreement with recent global fits, and a zero Dirac CP phase delta~0.

Stephen F. King; Christoph Luhn; Alexander J. Stuart

2012-07-24T23:59:59.000Z

305

Geomorphology of plutonium in the Northern Rio Grande  

Science Conference Proceedings (OSTI)

Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

Graf, W.L. [Arizona Univ., Tempe, AZ (United States). Dept., of Geography] Arizona Univ., Tempe, AZ (United States). Dept., of Geography

1993-03-01T23:59:59.000Z

306

2011 Annual Planning Summary for Office of Legacy Management (LM), Grand Junction (See LM APS)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Legacy Management (LM), Grand Junction (See LM APS).

307

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's...

308

Integrated Reservoir Characterization: Offshore Louisiana, Grand Isle Blocks 32 & 33  

E-Print Network (OSTI)

This thesis integrated geology, geophysics, and petroleum engineering data to build a detailed reservoir characterization models for three gas pay sands in the Grand Isle 33 & 43 fields, offshore Louisiana. The reservoirs are Late Miocene in age and include the upper (PM), middle (QH), and lower (RD) sands. The reservoir models address the stratigraphy of the upper (PM) sand and help delineate the lower (RD) reservoir. In addition, this research addresses the partially depleted QH-2 reservoir compartment. The detailed models were constructed by integrating seismic, well log, and production data. These detailed models can help locate recoverable oil and gas that has been left behind. The upper PM model further delineated that the PM sand has several areas that are shaled-out effectively creating a flow barrier within reservoir compartments. Due to the barrier in the PM-1 reservoir compartment, an area of potentially recoverable hydrocarbons remains. In Grand Isle 33, the middle QH sand was partially depleted in the QH-2 reservoir compartment by a series of development wells. Bottom hole pressure data from wells in Grand Isle 32 & 33 reveal that the two QH fault compartments are in communication across a leaking fault. Production wells in the QH-1 compartment produced reserves from the QH-2 compartment. The lower RD sand model helped further delineate the reservoir in the RD-2 compartment and show that this compartment has been depleted. The RD model also shows the possible presence of remaining recoverable hydrocarbons in the RD-1 compartment. It is estimated that about 6.7 billion cubic feet of gas might remain within this reservoir waiting to be recovered. A seismic amplitude anomaly response from the QH and RD sands is interpreted to be a lithologic indicator rather than the presence of hydrocarbons. Amplitude response from the PM level appears to be below the resolution of the seismic data. A synthetic seismogram model was generated to represent the PM and surrounding sands. This model shows that by increasing the frequency of the seismic data from 20 Hz to a dominant frequency of 30 Hz that the PM and surrounding sands could be seismically resolvable. Also the PM-1 compartment has possible recoverable hydrocarbons of 1.5 billion cubic feet of gas remaining.

Casey, Michael Chase

2011-05-01T23:59:59.000Z

309

Grand Ridge III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

III Wind Farm III Wind Farm Facility Grand Ridge III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

310

City of Grand Marais, Minnesota (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Marais, Minnesota (Utility Company) Marais, Minnesota (Utility Company) Jump to: navigation, search Name City of Grand Marais Place Minnesota Utility Id 7487 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png COMMERCIAL - SINGLE PHASE Commercial COMMERCIAL - THREE PHASE Commercial DUAL FUEL(Single Phase) DUAL FUEL(Three Phase) RESIDENTIAL - SINGLE PHASE Residential RESIDENTIAL - THREE PHASE Residential YARD LIGHT METERED Lighting YARD LIGHT UNMETERED Lighting

311

Grand Valley Rrl Pwr Line, Inc | Open Energy Information  

Open Energy Info (EERE)

Pwr Line, Inc Pwr Line, Inc Jump to: navigation, search Name Grand Valley Rrl Pwr Line, Inc Place Colorado Utility Id 7563 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial and Small Power Service, Three Phase Schedule (25)-CSP-1 Commercial Farm and Home (Residential) Service Schedule (10)-FH-1 Residential Industrial Service Schedule (50) -IND-1 Industrial Irrigation Service Schedule (40)-I-1 Commercial Large Power Service Schedule (30) -LP-1 Industrial Nonresidential - General Schedule (20)-NRG-1 Commercial

312

City of East Grand Forks, Minnesota (Utility Company) | Open Energy  

Open Energy Info (EERE)

Minnesota (Utility Company) Minnesota (Utility Company) Jump to: navigation, search Name East Grand Forks City of Place Minnesota Utility Id 5575 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Rate Commercial Off Peak Rates Commercial Residential Electric Heat Residential Residential General Electric Residential Small Commercial Rate Residential Average Rates Residential: $0.0943/kWh Commercial: $0.0740/kWh Industrial: $0.0789/kWh

313

EV Everywhere Grand Challenge - Electric Motors and Critical Materials Breakout  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Motors and Critical Electric Motors and Critical Materials Breakout Laura Marlino Oak Ridge National Laboratory Iver Anderson Ames Laboratory Facilitators July 24, 2012 EV Everywhere Grand Challenge Vehicle Technologies Program - Advanced Power Electronics and Electric Motors eere.energy.gov Electric Drive Status and Targets Current Status* PHEV 40** AEV 100** AEV 300+ System Cost $/kW 20 ($1100) 5 ($600) 14 ($1680) 4 ($600) Motor Specific Power kW/kg 1.3 1.9 1.5 2 PE Specific Power kW/kg 10.5 16 12 16.7 System Peak Efficiency % 90 97 91 98 2022 EV Everywhere Targets Extremely Aggressive Targets Especially Challenging for the Electric Motor * 55kW system ** 120kW system + 150 kW system Vehicle Technologies Program - Advanced Power Electronics and Electric Motors eere.energy.gov

314

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H.

2008-12-30T23:59:59.000Z

315

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H. [Oregon Department of Fish and Wildlife

2009-07-01T23:59:59.000Z

316

SU(5) x Z{sub 13} grand unification model  

SciTech Connect

We propose an SU(5) grand unified model with an invisible axion and the unification of the three coupling constants which is in agreement with the values, at M{sub Z}, of {alpha}, {alpha}{sub s}, and sin{sup 2}{theta}{sub W}. A discrete, anomalous, Z{sub 13} symmetry implies that the Peccei-Quinn symmetry is an automatic symmetry of the classical Lagrangian protecting, at the same time, the invisible axion against possible semiclassical gravity effects. Although the unification scale is of the order of the Peccei-Quinn scale the proton is stabilized by the fact that in this model the standard model fields form the SU(5) multiplets completed by new exotic fields and, also, because it is protected by the Z{sub 13} symmetry.

Dias, Alex G. [Centro de Ciencias Naturais e Humanas, Universidade Federal do ABC, Rua Santa Adelia 166, 09210-170, Santo Andre, SP (Brazil); Franco, Edison T.; Pleitez, Vicente [Instituto de Fisica Teorica, Universidade Estadual Paulista, Rua Pamplona 145, 01405-900, Sao Paulo, SP (Brazil)

2007-12-01T23:59:59.000Z

317

An SU(5)$\\otimes$Z_{13} Grand Unification Model  

E-Print Network (OSTI)

We propose an SU(5) grand unified model with an invisible axion and the unification of the three coupling constants which is in agreement with the values, at $M_Z$, of $\\alpha$, $\\alpha_s$, and $\\sin^2\\theta_W$. A discrete, anomalous, $Z_{13}$ symmetry implies that the Peccei-Quinn symmetry is an automatic symmetry of the classical Lagrangian protecting, at the same time, the invisible axion against possible semi-classical gravity effects. Although the unification scale is of the order of the Peccei-Quinn scale the proton is stabilized by the fact that in this model the standard model fields form the SU(5) multiplets completed by new exotic fields and, also, because it is protected by the $Z_{13}$ symmetry.

Alex G. Dias; Edison T. Franco; Vicente Pleitez

2007-08-07T23:59:59.000Z

318

A Graphical representation of the grand canonical partition function  

E-Print Network (OSTI)

In this paper we consider a stochastic partial differential equation defined on a Lattice $L_\\delta$ with coefficients of non-linearity with degree $p$. An analytic solution in the sense of formal power series is given. The obtained series can be re-expressed in terms of rooted trees with two types of leaves. Under the use of the so-called Cole-Hopf transformation and for the particular case $p=2$, one thus get the generalized Burger equation. A graphical representation of the solution and its logarithm is done in this paper. A discussion of the summability of the previous formal solutions is done in this paper using Borel sum. A graphical calculus of the correlation function is given. The special case when the noise is of L\\'evy type gives a simplified representations of the solution of the generalized Burger equation. From the previous results we recall a graphical representation of the grand canonical partition function.

Boubaker Smii

2010-01-07T23:59:59.000Z

319

Higgs-boson effects in grand unified theories  

DOE Green Energy (OSTI)

It is argued that fine tuning of a minimal set of parameters, needed to fix the hierarchy of gauge-boson masses and a knowledge of intermediate symmetry groups, leads to ''natural'' mass scales for physical Higgs bosons in grand unified theories. This is applied to ..delta..B = 2 transitions in models based on SU(5), SO(10), SU(16), and (SU(2N))/sup 4/. It turns out that the Higgs bosons which mediate ..delta..B = 2 neutron-antineutron and hydrogen-antihydrogen oscillations become superheavy, and so such transitions can be observable only in theories with low unification scales, such as SU(16) and (SU(8))/sup 4/, if we adhere to the hypothesis of minimal fine tuning.

Mohapatra, R.N.; Senjanovic, G.

1983-04-01T23:59:59.000Z

320

Heating facilities for the MGM Grand Hotel, Reno, Nevada  

SciTech Connect

The MGM Grand Hotel-Reno is located adjacent to an area with a well-documented geothermal resource. Currently, there is a number of entities seeking to determine the exact nature of the resource at the MGM site. This report concerns itself with identifying current natural gas loads within the MGM complex which could be met by geothermal should a source become available. The two principle assumptions upon which the following material is based are (1) that a source of 190/sup 0/F or higher temperature water is available and (2) all systems discussed would be installed in parallel with existing systems. That is, existing systems would remain in place providing 100 percent backup for the geothermal systems.

1981-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Grand Rapids Public Util Comm | Open Energy Information  

Open Energy Info (EERE)

Rapids Public Util Comm Rapids Public Util Comm Jump to: navigation, search Name Grand Rapids Public Util Comm Place Minnesota Utility Id 7489 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png CITY COMMERCIAL Commercial CITY LIGHT & POWER Lighting CITY RESIDENTIAL Residential CONTROLLED WATER HEATING (CITY) Commercial CONTROLLED WATER HEATING (RURAL) Commercial ENTERTAINMENT LIGHTING RATE (CITY) Lighting ENTERTAINMENT LIGHTING RATE (RURAL) Lighting INDUSTRIAL (CITY) Industrial

322

Is there a grand challenge or X-prize for data mining?  

Science Conference Proceedings (OSTI)

This panel will discuss possible exciting and motivating Grand Challenge problems for Data Mining, focusing on bioinformatics, multimedia mining, link mining, text mining, and web mining. Keywords: X-prize, bioinformatics, data mining, grand challenge, image mining, link mining, multimedia mining, text mining, video mining, web mining

Gregory Piatetsky-Shapiro; Robert Grossman; Chabane Djeraba; Ronen Feldman; Lise Getoor; Mohammed Zaki

2006-08-01T23:59:59.000Z

323

An applied paleoecology case study: Bahia Grande, Texas prior to construction of the Brownsville Ship Channel  

E-Print Network (OSTI)

Bahia Grande is a large lagoon located within Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. When the Brownsville Ship Channel was built along the southern end of the lagoon in 1936, Bahia Grande was cut off from the marine water of Laguna Madre. Since that time, Bahia Grande has been primarily dry with only ephemeral fresh water coming from heavy rainfall events, resulting in a severe decline in biological productivity. A restoration project led by the U.S. Fish and Wildlife Service has proposed to cut new channels between Bahia Grande and the Ship Channel to restore the connection with Laguna Madre. This is a large-scale project with major implications for the water quality, surrounding ecology, and associated biota in the region. Unfortunately, because very little is known about Bahia Grande prior to isolation, it is difficult to predict whether the results of the restoration will be comparable to the pre-Ship Channel environment. Paleoecological data provide the best opportunity to understand what Bahia Grande was like in the past. This study uses statistical analyses of the molluscan death assemblages from Bahia Grande to gain a better understanding of the environmental conditions in the lagoon before it was isolated. The first question addressed is how does Bahia Grande relate to other water bodies on the Texas coast? This may provide a modern analog to the past conditions in Bahia Grande. The second question inquires whether there are any local patterns or variations within Bahia Grande and several smaller surrounding lagoons. These results provide an important baseline for comparison with the restored lagoon. The results of this investigation show that, in a regional context, Bahia Grande was most similar to Alazan Bay and Baffin Bay, which are mostly enclosed shallow bays with high salinities due to the arid climate and limited freshwater inflow. Within Bahia Grande, there are several distinct molluscan assemblages. Salinity and water coverage are the most likely environmental factors responsible for the differences within Bahia Grande. Additionally, data from surrounding lagoons strongly indicate that some connections with Bahia Grande existed in the past.

Lichlyter, Stephen Alvah

2003-05-01T23:59:59.000Z

324

Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Deliver Keynote on EV Everywhere Grand Challenge to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show Secretary Chu to Deliver Keynote on EV Everywhere Grand Challenge at Washington Auto Show January 30, 2013 - 1:37pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - Tomorrow, Thursday, January 31, 2013, Secretary Chu will deliver the government keynote address at the Washington Auto Show's Public Policy Day. His remarks will focus on the Energy Department's EV Everywhere Grand Challenge, including progress to date and a new initiative to strengthen American leadership in this rapidly growing global industry. Launched by President Obama in March 2012, EV-Everywhere is the second in a series of Energy Department "Clean Energy Grand Challenges" aimed at addressing the most pressing energy challenges of our time. The EV

325

Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) |  

Open Energy Info (EERE)

Rio Grande Rift Region (Aiken & Ander, 1981) Rio Grande Rift Region (Aiken & Ander, 1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) Exploration Activity Details Location Rio Grande Rift Geothermal Region Exploration Technique Ground Gravity Survey Activity Date Usefulness useful DOE-funding Unknown References Carlos L.V. Aiken, Mark E. Ander (1981) A Regional Strategy For Geothermal Exploration With Emphasis On Gravity And Magnetotellurics Retrieved from "http://en.openei.org/w/index.php?title=Ground_Gravity_Survey_At_Rio_Grande_Rift_Region_(Aiken_%26_Ander,_1981)&oldid=401473" Category: Exploration Activities What links here Related changes Special pages Printable version

326

Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monitoring of the Airport Calibration Pads at Walker Field, Grand Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) More Documents & Publications Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report

327

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

328

Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001  

Office of Legacy Management (LM)

Grand Junction Disposal Site Grand Junction Disposal Site Uranium ore was processed at the Climax millsite at Grand Junction, Colorado, between 1951 and 1970. The milling operations created process-related waste and tailings, a sandlike material containing radioactive materials and other contaminants. The tailings were an ideal and inexpensive construction material suitable for concrete, mortar, and fill. Accordingly, the tailings were widely used in the Grand Junction area for these purposes. The U.S. Department of Energy (DOE) encapsulated the tailings and other contaminated materials from the millsite and more than 4,000 vicinity properties in the Grand Junction area in an engineered disposal cell. Part of the disposal cell was completed in 1994; the remainder of the cell remains open until it is

329

Grand Challenges Grand Challenges  

Science Conference Proceedings (OSTI)

... adversely impact oceans, groundwater systems, streams ... Vulnerability of Interdependent ... interdependent systems, additional vulnerabilities can be ...

2007-03-01T23:59:59.000Z

330

Sheldon Glashow, the Electroweak Theory, and the Grand Unified Theory  

Office of Scientific and Technical Information (OSTI)

Sheldon Glashow and the Electroweak Theory Sheldon Glashow and the Electroweak Theory Resources with Additional Information Sheldon Glashow Courtesy AIP Emilio Segrè Visual Archives, Segrè Collection [Sheldon] 'Glashow shared the 1979 Nobel Prize for physics with Steven Weinberg and Abdus Salam for unifying the theories of weak and electromagnetic forces. The new "electroweak" theory underlies all of particle physics and provides a framework for understanding how the early universe evolved and how the chemical elements were created. ... "Glashow's work has been instrumental in our understanding of how our universe came into being," says Lawrence R. Sulak, chairman of the Boston University physics department. "In the years since winning the prize, Glashow has helped develop the Grand Unified Theory of all particles and all forces. Its predictions led to the construction of massive underground detectors, the refinement of the unification models, the first observation of neutrinos from a supernova, and the recent discovery that neutrinos have mass. Glashow has fueled an ongoing search for rare events and exotic effects that may shed further light on the evolution of the early universe."1

331

Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998  

SciTech Connect

The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997.

NONE

1998-04-01T23:59:59.000Z

332

Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al.,  

Open Energy Info (EERE)

Morgan, Et Al., Morgan, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Exploration Activity Details Location Rio Grande Rift Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown Notes San Luis Basin (south-central CO) regional study. References Paul Morgan, Peter Barkmann, Charles Kluth, Matthew Sares (2010) Prospects For Electricity Generation In The San Luis Basin, Colorado, Usa Retrieved from "http://en.openei.org/w/index.php?title=Data_Acquisition-Manipulation_At_Rio_Grande_Rift_Region_(Morgan,_Et_Al.,_2010)&oldid=401472" Category: Exploration

333

SunShot Shoots for the Moon with First Grand Challenge Event | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event May 23, 2012 - 11:40am Addthis The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. Ramamoorthy Ramesh Former Director, SunShot Initiative & Solar Energy Technologies Program How can I participate? The SunShot Initiative Grand Challenge: Summit and Technology Forum , taking place June 13 -14 in Denver, will focus on the progress made and challenges ahead for driving down the cost of solar technologies.

334

The SO2 Allowance Trading System: The Ironic History of a Grand Policy Experiment  

E-Print Network (OSTI)

Two decades have passed Two decades have passed since the Clean Air Act Amendments of 1990 launched a grand experiment in market-based environmental policy: the SO2 cap-and-trade system. That system performed well but ...

Schmalensee, Richard

335

Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Grande Lodge Pool & Spa Low Temperature Geothermal Facility Grande Lodge Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility Facility Sierra Grande Lodge Sector Geothermal energy Type Pool and Spa Location Truth or Consequences, New Mexico Coordinates 33.1284047°, -107.2528069° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

336

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and 355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah Summary The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water

337

Microsoft Word - CX-GrandCoulee-Bell3WestsideInsulatorRepAccessImprov_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Kjelland Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line insulator replacement and access improvement project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit

338

A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand  

Open Energy Info (EERE)

Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Details Activities (4) Areas (1) Regions (0) Abstract: Erosion in the Grand Canyon of the Yellowstone River, Yellowstone Caldera (640 ka), Wyoming, has exposed a cross section of older hydrothermal alteration in the canyon walls. The altered outcrops of the post-collapse tuff of Sulphur Creek (480 ka) extend from the canyon rim to more than 300 m beneath it. The hydrothermal minerals are zoned, with an advanced argillic alteration consisting of an association of quartz (opal)

339

The systemic and ideological sources of grand strategic doctrine : American foreign policy in the twentieth century  

E-Print Network (OSTI)

What explains the puzzling variation in America's foreign policy posture? This study proposes and tests a theory of American grand strategy that places an emphasis on two key variables: the ideological content of American ...

Green, Brendan Rittenhouse

2011-01-01T23:59:59.000Z

340

Transport of a Power Plant Tracer Plume over Grand Canyon National Park  

Science Conference Proceedings (OSTI)

Meteorological and air-quality data, as well as surface tracer concentration values, were collected during 1990 to assess the impacts of Navajo Generating Station (NGS) emissions on Grand Canyon National Park (GCNP) air quality. These data have ...

Jun Chen; Robert Bornstein; Charles G. Lindsey

1999-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Monitoring Fine Sediment; Grande Ronde and John Day Rivers, 1999 Annual Report.  

DOE Green Energy (OSTI)

This project was initiated to monitor surface fine sediment levels and overwinter intrusion of fine sediment in spring chinook salmon spawning habitat in the North Folk John Day and Grande Ronde Rivers, for five years.

Rhodes, Jonathan J.; Greene, M. Jonas; Purser, Michael D. (Columbia River Inter-Tribal Fish Commission, Portland, OR)

2000-01-01T23:59:59.000Z

342

SunShot Shoots for the Moon with First Grand Challenge Event...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home SunShot Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with...

343

The great american navel : le grand roman amricain et le langage appropri.  

E-Print Network (OSTI)

??Ce mmoire a pour objectif d'analyser le phnomne du Grand Roman Amricain comme reprsentation de l'imaginaire national, en en faisant l'archologie. Je propose, partir (more)

Grenier, Daniel

2009-01-01T23:59:59.000Z

344

Observations of Silver Iodide Plumes over the Grand Mesa of Colorado  

Science Conference Proceedings (OSTI)

A series of wintertime airborne tracing experiments was examined to determine some characteristics of the plumes of silver iodide smoke released either from the ground or from an aircraft over the Grand Mesa of Colorado. The plumes were ...

Edmond W. Holroyd III; Jack T. McPartland; Arlin B. Super

1988-10-01T23:59:59.000Z

345

Aspects of the Load Circulation at the Grand Canyon during the Fall Season  

Science Conference Proceedings (OSTI)

The atmosphere and circulation of air within, above, and around the Grand Canyon of the Colorado River was studied from an instrumented aircraft and from ground-based instruments in September and October 1984. Several patterns were identified. ...

L. P. Stearns

1987-10-01T23:59:59.000Z

346

Proceedings of the 45th IEEE Conference on Decision & Control Manchester Grand Hyatt Hotel  

E-Print Network (OSTI)

Proceedings of the 45th IEEE Conference on Decision & Control Manchester Grand Hyatt Hotel San towards these two goals utilizing a minimal 3-CMG array to provide 646% singularity-free momentum

347

Views from the River Front: Rio Grande Decision Makers Rank Water Conservation Strategies  

E-Print Network (OSTI)

This publication details the results of a survey of elected city officials and water managers in the Rio Grande River Basin of Texas and New Mexico. The participants ranked water conservation strategies for their communities.

Silvy, Valeen; Lesikar, Bruce J.

2005-10-18T23:59:59.000Z

348

DOE/Grand Junction Office Bluewater LTSP July 1997 Doc. No. S00012AA, Page iii  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/Grand Junction Office Bluewater LTSP DOE/Grand Junction Office Bluewater LTSP July 1997 Doc. No. S00012AA, Page iii Contents Page 1.0 Introduction .........................................................................................................................................1 1.1 Purpose ................................................................................................................................1 1.2 Legal and Regulatory Requirements .................................................................................. 1 1.3 Role of the Department of Energy ..................................................................................... 2 1.4 Disposal of Mill Waste Containing Polychlorinated Biphenyls ........................................ 2 2.0 Bluewater Disposal Site .....................................................................................................................

349

DOE - Office of Legacy Management -- Curtiss-Wright Corp Metals Processing  

Office of Legacy Management (LM)

Curtiss-Wright Corp Metals Curtiss-Wright Corp Metals Processing Div - NY 40 FUSRAP Considered Sites Site: Curtiss-Wright Corp., Metals Processing Div. (NY.40 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: Curtiss-Wright Corporation NY.40-1 Location: Buffalo , New York NY.40-1 Evaluation Year: 1987 NY.40-2 Site Operations: Performed casting, forging, and extrusion operations for the U.S. Air Force and the AEC. NY.40-1 NY.40-2 Site Disposition: Eliminated - Referred to DOD NY.40-2 NY.40-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.40-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD NY.40-2

350

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 1995-2002 Summary Report.  

DOE Green Energy (OSTI)

The Grande Ronde Basin once supported large runs of chinook salmon Oncorhynchus tshawytscha and estimated peak escapements in excess of 10,000 occurred as recently as the late 1950's (U.S. Army Corps of Engineers 1975). Natural escapement declines in the Grande Ronde Basin have been severe and parallel those of other Snake River populations. Reduced productivity has primarily been attributed to increased mortality associated with downstream and upstream migration past eight dams and reservoirs in the Snake and Columbia rivers. Reduced spawner numbers, combined with human manipulation of previously important spawning and rearing habitat in the Grande Ronde Basin, have resulted in decreased spawning distribution and population fragmentation of chinook salmon in the Grande Ronde Basin (Figure 1; Table 1). Escapement of spring/summer chinook salmon in the Snake River basin included 1,799 adults in 1995, less than half of the previous record low of 3,913 adults in 1994. Catherine Creek, Grande Ronde River and Lostine River were historically three of the most productive populations in the Grande Ronde Basin (Carmichael and Boyce 1986). However, productivity of these populations has been poor for recent brood years. Escapement (based on total redd counts) in Catherine Creek and Grande Ronde and Lostine rivers dropped to alarmingly low levels in 1994 and 1995. A total of 11, 3 and 16 redds were observed in 1994 in Catherine Creek, upper Grande Ronde River and Lostine River, respectively, and 14, 6 and 11 redds were observed in those same streams in 1995. In contrast, the maximum number of redds observed in the past was 505 in Catherine Creek (1971), 304 in the Grande Ronde River (1968) and 261 in 1956 in the Lostine River (Tranquilli et al 2003). Redd counts for index count areas (a standardized portion of the total stream) have also decreased dramatically for most Grande Ronde Basin streams from 1964-2002, dropping to as low as 37 redds in the 119.5 km in the index survey areas in 1995 from as high as 1,205 redds in the same area in 1969 (Table 1). All streams reached low points (0-6 redds in the index areas) in the 1990's, except those in which no redds were found for several years and surveys were discontinued, such as Spring, Sheep and Indian creeks which had a total of 109 redds in 1969. The Minam and Wenaha rivers are tributaries of the Grande Ronde River located primarily in wilderness areas. Chinook salmon numbers in these two streams (based on redd counts) also decreased dramatically beginning in the early 1970's (Table 1). Since then there have been a few years of increasing numbers of redds but counts have generally been 25-40% of the number seen in the 1960's. No hatchery fish have been released into either of these streams and we monitor them during spawning ground surveys for the presence of hatchery strays. These populations will be used as a type of control for evaluating our supplementation efforts in Catherine Creek, upper Grande Ronde River and Lostine River. In this way, we can attempt to filter out the effects of downstream variables, over which we have no control, when we interpret the results of the captive broodstock program as the F1 and F2 generations spawn and complete their life cycles in the wild. The Grande Ronde Basin Captive Broodstock Program was initiated because these chinook salmon populations had reached critical levels where dramatic and unprecedented efforts were needed to prevent extinction and preserve any future options for use of endemic fish for artificial propagation programs for recovery and mitigation. This program was designed to quickly increase numbers of returning adults, while maintaining the genetic integrity of each endemic population.

Hoffnagle, Timothy; Carmichael, Richard; Noll, William

2003-12-01T23:59:59.000Z

351

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

352

Tennessee Valley Authority Buffalo Mountain Wind Power Project First- and Second-Year Operating Experience: 2001-2003: U.S. Departme nt of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the turbine performance and operating experience from July 2001 through June 2003 at the Tennessee Valley Authority (TVA) Buffalo Mountain Wind Power Project, located near Oliver Springs, Tennessee. The report summarizes the project's wind resource data, energy production, availability, operation and maintenance experience, and power curve performance measurements. Lessons learned from the project will be valuable to other utilities or companies planning similar wind power projects.

2003-12-22T23:59:59.000Z

353

A Small City's Big Scandal: Municipal Corruption, Progressive Reform, and the Grand Rapids, Michigan Water Scandal, 1900-1906.  

E-Print Network (OSTI)

??At the turn of century the city of Grand Rapids, Michigan began debating plans for expanding its water supply. These debates quickly spawned corrupt dealings, (more)

Sarnacki, Brian F.

2011-01-01T23:59:59.000Z

354

Microsoft Word - CX-GrandCoulee-OkanoganWP-AR-Landing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Jim Semrau Robert Keudell Road Engineer - TELF-TPP-3 Line Foreman III - TFWK-Grand Coulee Todd Wehner Robert Zellar Road Engineer - TELF-TPP-3 Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along the Grand Coulee-Okanogan #2 115-kV transmission line right-of-way (ROW). PP&A Project No: 1776 Work Order No.: 275584 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

355

Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Attend Grand Opening of Recovery Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the Recovery Act, the A123 Systems battery plant is expected to create 3,000 jobs in Michigan by 2012 and help to establish the U.S. as a global leader in the manufacturing of electric vehicles. Following his speech, the Secretary will tour the production facility and participate in a media availability with elected officials and representatives from A123 Systems.

356

UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6  

Science Conference Proceedings (OSTI)

This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

NONE

1995-09-01T23:59:59.000Z

357

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

NLE Websites -- All DOE Office Websites (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

358

Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu to Attend Grand Opening of Recovery Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the Recovery Act, the A123 Systems battery plant is expected to create 3,000 jobs in Michigan by 2012 and help to establish the U.S. as a global leader in the manufacturing of electric vehicles. Following his speech, the Secretary will tour the production facility and participate in a media availability with elected officials and representatives from A123 Systems.

359

Microsoft Word - CX-GrandCoulee-ChiefJoseph_ARandWood Poles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Todd Wehner Road Engineer - TELF-TPP-3 Robert Keudell Line Foreman III - TFWK-Grand Coulee Robert Zellar Line Foreman I - TFWK-Grand Coulee Proposed Action: Wood pole replacement, equipment landing construction and access road construction/maintenance along portions of the Grand Coulee-Chief Joseph #1 and #2 230-kV transmission line rights-of-way. PP&A Project No: 1777 Work Order No.: 275582 and 275583 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads.  B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such

360

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

DOE Green Energy (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Widdop, M.R.

1996-08-01T23:59:59.000Z

362

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J. Bembia for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY http:energy.govemdownloadswestern-new-york-nuclear-service-center-history Download Western...

363

Solid-State Lighting at Sandia National Laboratory - Grand Challenge LDRD  

NLE Websites -- All DOE Office Websites (Extended Search)

| | Sandia Press Releases & News Coverage | GRAND CHALLENGE LDRD PROJECT 6images of light To accelerate the development of the science and technology underlying Solid State Lighting, Sandia initiated, in October 2000, a multi-year Grand Challenge Laboratory Directed Research and Development (GCLDRD) project, " A Revolution in Lighting -- Building the Science and Technology Base for Ultra-Efficient Solid-State Lighting." This project is considered one of Sandia's most successful GCLDRDs. One way in which the SSL GCLDRD was different from others was that it coincided with a larger effort by the SSL community - primarily industrial companies investing in SSL, but also universities, trade organizations, and

364

Union County - La Grande, Oregon geothermal district heating: feasibility assessment. Final report  

DOE Green Energy (OSTI)

This report presents an assessment of geothermal district heating in the City of La Grande, Oregon. Eight study area districts were analyzed to determine their economic feasibility. Results from the analyses conclude that certain districts within the City of La Grande are economically feasible if certain assumptions are correct. Development of geothermal district heating for these areas would provide direct energy and dollar savings to the building owners and would also provide direct and indirect benefits to low and moderate income households within the City.

Jenkins, H. II; Giddings, M.; Hanson, P.

1982-09-01T23:59:59.000Z

365

Northeast Oregon Hatchery Program Grande Ronde … Imnaha Spring Chinook Hatchery Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast Oregon Hatchery Program Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Final Environmental Impact Statement Bonneville Power Administration July 2004 Northeast Oregon Hatchery Program -- Grande Ronde-Imnaha Spring Chinook Project i Table of Contents Page Chapter 1: Updated Summary and Project Description 1.1 Introduction..............................................................................................................1-1 1.2 Purpose and Need for the Proposed Action .............................................................1-2 1.3 Decisions to be Made and Responsible Officials ....................................................1-3 1.4 Summary of Public Involvement, Consultation, and Coordination.........................1-3

366

Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.  

DOE Green Energy (OSTI)

This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

Merker, Christopher

1993-04-01T23:59:59.000Z

367

DOE/EA-1312: Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (September 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Rev. 0 Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) Final September 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy EA of Ground Water Compliance at the Grand Junction UMTRA Project Site DOE Grand Junction Office Page ii Final September 1999 Contents Executive Summary.........................................................................................................................v 1.0 Introduction...............................................................................................................................1 1.1 Grand Junction UMTRA Project Site Location and Description.........................................1

368

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Appendices  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Appendices Grand County, Colorado June 2013 Appendix A EIS Scoping Report GRANBY PUMPING PLANT - WINDY GAP TRANSMISSION LINE REBUILD PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING SUMMARY REPORT December 4, 2007

369

Into the Teeth of the Gale: The Remarkable Advance of a Cold Front at Grand Manan  

Science Conference Proceedings (OSTI)

The afternoon of 30 December 1962 saw the nearly simultaneous arrival at Grand Manan (an island in the Bay of Fundy) of an intense cold front, accompanied by northwesterly gales and snow, and an intense small cyclonic vortex, producing a mild ...

Robert M. Cunningham; Frederick Sanders

1987-10-01T23:59:59.000Z

370

Using hydrodynamic modeling for estimating flooding and water depths in grand bay, alabama  

Science Conference Proceedings (OSTI)

This paper presents a methodology for using hydrodynamic modeling to estimate inundation areas and water depths during a hurricane event. The Environmental Fluid Dynamic Code (EFDC) is used in this research. EFDC is one of the most commonly applied models ... Keywords: EFDC, flooding, grand bay, grid generation, hydrodynamics, inundation, modeling

Vladimir J. Alarcon; William H. McAnally

2012-06-01T23:59:59.000Z

371

Wind-Flow Patterns in the Grand Canyon as Revealed by Doppler Lidar  

Science Conference Proceedings (OSTI)

Many interesting flow patterns were found in the Grand Canyon by a scanning Doppler lidar deployed to the south rim during the 1990 Wintertime Visibility Study. Three are analyzed in this study: 1) flow reversal in the canyon, where the flow in ...

Robert M. Banta; Lisa S. Darby; Pirmin Kaufmann; David H. Levinson; Cui-Juan Zhu

1999-08-01T23:59:59.000Z

372

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska  

Energy.gov (U.S. Department of Energy (DOE))

DOEs Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near the city of ONeill, Nebraska, to Westerns power transmission system. The proposed wind energy generation project would include up to 266 wind turbines.

373

Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.  

DOE Green Energy (OSTI)

The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

Ashley, Paul

1992-06-01T23:59:59.000Z

374

Debris flow deposition and reworking by the Colorado River in Grand Canyon, Arizona  

E-Print Network (OSTI)

Debris flow deposition and reworking by the Colorado River in Grand Canyon, Arizona Brian J Canyon, Arizona, transport coarse-grained sediment onto debris fans adjacent to the Colorado River and Monument Creeks using photogrammetry of aerial photography taken from 1965 to 2000 and supplemented

375

THE RISE AND FALL OF OPEN SOLAR FLUX DURING THE CURRENT GRAND SOLAR MAXIMUM  

Science Conference Proceedings (OSTI)

We use geomagnetic activity data to study the rise and fall over the past century of the solar wind flow speed V{sub SW}, the interplanetary magnetic field strength B, and the open solar flux F {sub S}. Our estimates include allowance for the kinematic effect of longitudinal structure in the solar wind flow speed. As well as solar cycle variations, all three parameters show a long-term rise during the first half of the 20th century followed by peaks around 1955 and 1986 and then a recent decline. Cosmogenic isotope data reveal that this constitutes a grand maximum of solar activity which began in 1920, using the definition that such grand maxima are when 25-year averages of the heliospheric modulation potential exceeds 600 MV. Extrapolating the linear declines seen in all three parameters since 1985, yields predictions that the grand maximum will end in the years 2013, 2014, or 2027 using V{sub SW}, F{sub S}, or B, respectively. These estimates are consistent with predictions based on the probability distribution of the durations of past grand solar maxima seen in cosmogenic isotope data. The data contradict any suggestions of a floor to the open solar flux: we show that the solar minimum open solar flux, kinematically corrected to allow for the excess flux effect, has halved over the past two solar cycles.

Lockwood, M.; Rouillard, A. P. [Space Environment Physics, School of Physics and Astronomy, Southampton University, Highfield, Southampton SO17 1BJ (United Kingdom); Finch, I. D. [Space Science and Technology Department, Rutherford Appleton Laboratory, Chilton, Didcot, Oxfordshire OX11 0QX (United Kingdom)], E-mail: mike.lockwood@stfc.ac.uk

2009-08-01T23:59:59.000Z

376

Storm-Forced Baroclinic Near-Inertial Currents on the Grand Bank  

Science Conference Proceedings (OSTI)

Current meter data for six mouths from the Grand Bank are analyzed to study inertial currents generated by moving storms. It is found that during periods of strong winds, but no well-defined storm system, the inertial motion exhibits no simple ...

Brad De Young; C. L. Tang

1990-11-01T23:59:59.000Z

377

Proceedings of the 45th IEEE Conference on Decision & Control Manchester Grand Hyatt Hotel  

E-Print Network (OSTI)

Proceedings of the 45th IEEE Conference on Decision & Control Manchester Grand Hyatt Hotel San can supply. For a DES, commonly applied performance metrics include average system time, utilization and operate the system or the resources that the system utilizes, such as communication channels, space, time

Cassandras, Christos G.

378

SICE Annual Conference 2010 August 18-21, 2010, The Grand Hotel, Taipei, Taiwan  

E-Print Network (OSTI)

SICE Annual Conference 2010 August 18-21, 2010, The Grand Hotel, Taipei, Taiwan ¥400 © 2010 SICE. Thus, the proposed system can potentially be utilized in the legged robots where the COM moves due utilized in various applications, including navigation (robots, vehicles, rockets, and etc) [2-4], state

Lin, Pei-Chun

379

Proceedings of the 45th IEEE Conference on Decision & Control Manchester Grand Hyatt Hotel  

E-Print Network (OSTI)

Proceedings of the 45th IEEE Conference on Decision & Control Manchester Grand Hyatt Hotel San describing the left and right turn minimum radius paths of the vehicle. Utilizing this construction, a weak then be utilized to plan shortest path segments in the presence of obstacles in future work. In order to avoid

Barth, Eric J.

380

Current System South and East of the Grand Banks of Newfoundland  

Science Conference Proceedings (OSTI)

During AprilJune 1972 three ships conducted a survey of the region between the Grand Banks and the Mid-Atlantic Ridge, including a grid of hydrographic stations, and two long lines of near-bottom current-meter moorings across the Gulf Stream and ...

R. Allyn Clarke; Harry W. Hill; Robert F. Reiniger; Bruce A. Warren

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Ny historia?; A new history?.  

E-Print Network (OSTI)

?? This essay aims to examine how three active history teachers in the upper secondary school interprets the new course plan for history in gy11. (more)

Axelsson, Christofer

2010-01-01T23:59:59.000Z

382

ny_50m_wind  

NLE Websites -- All DOE Office Websites (Extended Search)

ataTechnologySpecificUnitedStatesWindHighResolutionNewYorkWindHighResolution.zip> Description: Abstract: Annual average wind resource potential for New York at a 50...

383

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

384

ROSA: Distributed Joint Routing and Dynamic Spectrum Allocation in Cognitive Radio Ad Hoc Networks  

E-Print Network (OSTI)

, State University of New York at Buffalo, Buffalo, NY 14260, USA § Air Force Research Laboratory, RIGE the utilization efficiency of the 1 This work was supported by the U.S. Air Force Research Labora- tory under­29, 2009, Tenerife, Canary Islands, Spain. Copyright 2009 ACM 978-1-60558-616-9/09/10 ...$10.00. existing

Melodia, Tommaso

385

DOE/EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Project Office To Non-DOE Ownership (04/25/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 F I N A L Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy * Grand Junction Office * 2597 B ¾ Road * Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final DOE/EA-1338 FINAL Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy Grand Junction Office 2597 B ¾ Road Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final i April 2000 TABLE OF CONTENTS Title Page Table of Contents ......................................................................................................................................... i List of Figures ............................................................................................................................................iii

386

US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

Krabacher, J.E.

1996-08-01T23:59:59.000Z

387

EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Drive (Power Electric Drive (Power Electronics and Electric Machines) Workshop Tuesday, July 24, 2012 - Doubletree O'Hare, Chicago, IL Event Objective: DOE aims to obtain stakeholder input on the Power Electronics and Electric Machines (PEEM) goals of the EV Everywhere Grand Challenge. This input will advise the aggressive next-generation technology research and development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. The EV Everywhere Grand Challenge Electric Drive (Power Electronics and Electric Machines) Workshop was attended by senior officials of the Department of Energy and representatives from the following

388

EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

- 7/20/2012 - 7/20/2012 EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Tuesday, July 24, 2012 - Doubletree O'Hare, Chicago, IL Event Objective: DOE aims to obtain stakeholder input on the Power Electronics and Electric Machines (PEEM) goals of the EV Everywhere Grand Challenge. This input will advise the aggressive next- generation technology research and development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. 8:30-8:35 AM CONTINENTAL BREAKFAST 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program

389

U.S. Department of Energy at Grand Junction 2003 Annual Inspection⎯Monticello, Utah  

Office of Legacy Management (LM)

at Grand Junction 2003 Annual Inspection⎯Monticello, Utah at Grand Junction 2003 Annual Inspection⎯Monticello, Utah November 2003 Page 1 2003 Annual Inspection of the Monticello Mill Tailings (USDOE) and Monticello Radioactively Contaminated Properties Sites Summary The Monticello site, which includes the U.S. Department of Energy (DOE) Monticello Mill Tailings Site (MMTS) and the Monticello Radioactively Contaminated Properties site, was inspected September 23-25, 2003. A follow-up inspection of the Soil and Sediment properties was conducted on October 8, 2003. The Monticello Radioactively Contaminated Properties site is also called the Monticello Vicinity Properties (MVP) and will be referred to as MVP in this report. Restoration work at MVP is complete and is nearly complete at MMTS. MVP is in good

390

Microsoft Word - CX-GrandRonde-Boyer-ImpairmentEmergency-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Jim Semrau Civil Engineer - TEP-TPP-1 Proposed Action: Wood pole replacement PP&A Project No.: 2760 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Structures 4/5 and 4/6 of Bonneville Power Administration's (BPA) 115-kilovolt Grand Ronde-Boyer No. 1 transmission line located in Polk County, Oregon (Willamette Meridian, T6S, R8W, section 8, se ¼ of se ¼). Proposed by: BPA Description of the Proposed Action: BPA proposes to fix two ground impairments between structures 4/5 and 4/6 on the Grand Ronde-Boyer No. 1 line. The impairments are required to be fixed within 30 days of detection due to concerns for public safety. The conductor on a typical

391

EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

7/26/2012 7/26/2012 EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Monday, July 30, 2012 - LAX Marriott, Los Angeles, CA Event Objective: DOE aims to obtain stakeholder input on the consumer acceptance and charging infrastructure barriers associated with the EV Everywhere Grand Challenge. This input will help guide the Challenge and the next-generation technology development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles - and to do so within the next 10 years. 8:00-8:30AM CONTINENTAL BREAKFAST 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program

392

DOE/EIS-0340; Grand Ronde … Imnaha Spring Chinook Hatchery Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 NORTHEAST OREGON HATCHERY PROGRAM GRANDE RONDE - IMNAHA SPRING CHINOOK HATCHERY PROJECT DOE/EIS-0340 Draft Environmental Impact Statement Northeast Oregon Hatchery Program Grande Ronde - Imnaha Spring Chinook Hatchery Project Draft Environmental Impact Statement (DOE/EIS-0340) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Federal Agencies: U.S. Department of Interior, Fish and Wildlife Service (USFWS); U.S. Department of Commerce, National Oceanic and Atmospheric Administration National Marine Fisheries Service (NOAA Fisheries); U.S. Department of Agriculture, Forest Service Cooperating Tribes: Nez Perce Tribe (NPT), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Cooperating State Agencies: Oregon Department of Fish and Wildlife (ODFW)

393

Microsoft Word - CX-GrandCouleeBellNo3-WestsideAgLand_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Mark Kjelland Project Manager - TEP-TPP-2 Proposed Action: Insulator replacement in agricultural lands along the Grand Coulee-Bell No. 3/Grand Coulee-Westside No. 1 double circuit 230-kV transmission line Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1909 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA)

394

Microsoft Word - CX-GrandCoulee-BellNo3ReconductoringFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: Grand Coulee-Bell No. 3 double circuit 230-kV transmission line reconductoring project Budget Information: Work Order #00280243 PP&A Project No.: PP&A 1946 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Grand Coulee-Bell No. 3 Double Circuit 230-kV Transmission Line Reconductoring Project is located in Grant, Lincoln, and Spokane counties, Washington, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project listed below (Table 1).

395

Microsoft Word - CX-GrandCoulee-BellNo5InsultatorFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacie Hensley Project Manager - TEP-TPP-4 Proposed Action: Grand Coulee-Bell No. 5 Dead End Insulator Replacement Project Budget Information: Work Order #00339638 PP&A Project No.: 2699 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Grant and Lincoln counties, Washington, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed below (Table 1). Table 1. Townships, Ranges, and Sections for the Grand Coulee-Bell No.5 Dead End Insulator Replacement Project. Township Range Sections

396

Efficient Irrigation for Water Conservation in the Rio Grande Basin: 2010/2011 Progress and Accomplishments  

E-Print Network (OSTI)

Since 2001, the Efficient Irrigation for Water Conservation in the Rio Grande Basin Federal Initiative-known as the Rio Grande Basin Initiative (RGBI)-has saved more than 5 million acre-feet of water. Researchers, Extension specialists, and county Extension agents from Texas AgriLife Research, the Texas AgriLife Extension Service, and the New Mexico State University Agricultural Experiment Station and Cooperative Extension Service work with local irrigation districts, agricultural producers, homeowners, and regional agencies to meet present and future water demand through water conservation and efficient irrigation measures. This project is funded through the U.S. Department of Agriculture National Institute of Food and Agriculture and is administered by the Texas Water Resources Institute and the New Mexico State University Water Task Force.

Kalisek, D.; Harris, B. L.; Runyan, C.; DeMouche, L.

2011-06-01T23:59:59.000Z

397

Efficient Irrigation for Water conservation in the Rio Grande Basin: 2010-2011 Progress and Accomplishments  

E-Print Network (OSTI)

Since 2001, the Efficient Irrigation for Water Conservation in the Rio Grande Basin Federal Initiative known as the Rio Grande Basin Initiative (RGBI)has saved more than 5 million acre-feet of water. Researchers, Extension specialists, and county Extension agents from Texas AgriLife Research, the Texas AgriLife Extension Service, and the New Mexico State University Agricultural Experiment Station and Cooperative Extension Service work with local irrigation districts, agricultural producers, homeowners, and regional agencies to meet present and future water demand through water conservation and efficient irrigation measures. This project is funded through the U.S. Department of Agriculture National Institute of Food and Agriculture and is administered by the Texas Water Resources Institute and the New Mexico State University Water Task Force.

Kalisek, D.; Harris, B.L.; Runyan, C.; DeMouche, L.

2011-06-21T23:59:59.000Z

398

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

399

Habitat Evaluation Procedures (HEP) Report : Grand Coulee Dam Mitigation, 1996-1999 Technical Report.  

DOE Green Energy (OSTI)

The purpose of this Habitat Evaluation Procedures (HEP) study was to determine baseline habitat units and to estimate future habitat units for Bonneville Power Administration (BPA) mitigation projects on the Spokane Indian Reservation. The mitigation between BPA and the Spokane Tribe of Indians (STOI) is for wildlife habitat losses on account of the construction of Grand Coulee Dam. Analysis of the HEP survey data will assist in mitigation crediting and appropriate management of the mitigation lands.

Kieffer, B.; Singer, Kelly; Abrahamson, Twa-le

1999-07-01T23:59:59.000Z

400

Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

DOE Green Energy (OSTI)

This report documents the fourth year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

Johnson, Robert L.; Simmons, Mary Ann; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

2005-02-25T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Study of the effects of a disaster at Grand Coulee Dam upon the Hanford Works  

SciTech Connect

Declassified 23 Nov 1973. It is assumed that the Grand Coulee Dam would be destroyed by one direct hit following detonation of an atomic bomb. Major effects of the explosion include flooding and isolation of Richland, flooding of Midway Substation, and flooding of surrounding areas. Maximum water elevations following a direct hit and indirect hits are estimated. Data are presented for flow through openings and flow through dam failure. (HLW)

Kramer, H.A.

1950-02-01T23:59:59.000Z

402

Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

SciTech Connect

This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

2004-01-01T23:59:59.000Z

403

Site observational work plan for the UMTRA project site at Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

NONE

1996-01-01T23:59:59.000Z

404

Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

405

Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

406

Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

407

Grand Challenge Problems in Environmental Modeling and Remediation: Groundwater Contaminant Transport (Partnerships in Computational Science)  

SciTech Connect

The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the University of South Carolina component of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997. Seven institutions were primarily involved in this project: Brookhaven National Laboratory, Oak Ridge National Laboratory, Princeton University, SUNY at Stony Brook, Texas A&M University, The University of South Carolina, and the University of Texas at Austin, with contributing efforts from the Westinghouse Savannah River Technology Center. Each institution had primary responsibility for specific research components, but strong collaboration among all institutions was essential for the success of the project and in producing the final deliverables. PICS deliverables include source code for the suite of research simulators and auxiliary HPC tools, associated documentation, and test problems. These materials will be available as indicated from each institution's web page or from the Center for Computational Sciences Oak Ridge National Laboratory in January 1998.

Sharpley, Robert C.

1997-12-01T23:59:59.000Z

408

Microsoft Word - NEPA_CX_Acquisition_of_OTEC_Disconnect_Switch_LaGrand_Substation_05-08-2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kelly Miller Kelly Miller Project Manager - TG-DITT-2 Proposed Action: BPA Acquisition of OTEC Disconnect Switch at the BPA LaGrande Substation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24 Property Transfer Location: BPA LaGrande Substation, in the City of LaGrande, Union County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to purchase the 230-kilovolt (kV) main bus disconnect switch (MB A-270) that is currently installed and operating within the BPA LaGrande Substation. The disconnect switch is owned by the Oregon Trail Electric Cooperative (OTEC). On October 7, 2011, the manager of engineering for OTEC requested that BPA purchase the disconnect switch. The disconnect switch is the only piece of equipment within

409

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

410

Meteorological Processes Affecting the Transport of Emissions from the Navajo Generating Station to Grand Canyon National Park  

Science Conference Proceedings (OSTI)

During the 1990 Navajo Generating Station (NGS) Winter Visibility Study, a network of surface and upper-air meteorological measurement systems was operated in and around Grand Canyon National Park to investigate atmospheric processes in complex ...

Charles G. Lindsey; Jun Chen; Timothy S. Dye; L. Willard Richards; Donald L. Blumenthal

1999-08-01T23:59:59.000Z

411

Proceedings of the 45th IEEE Conference on Decision & Control ThAl8.6 Manchester Grand Hyatt Hotel  

E-Print Network (OSTI)

Proceedings of the 45th IEEE Conference on Decision & Control ThAl8.6 Manchester Grand Hyatt Hotel that the energy efficiency of wireless networks can be greatly improved by utilizing transmission control

Cassandras, Christos G.

412

Early life history study of Grande Ronde River Basin chinook salmon. Annual progress report, September 1, 1994--August 31, 1995  

DOE Green Energy (OSTI)

The Grande Ronde River originates in the Blue Mountains in northeast Oregon and flows 334 kilometers to its confluence with the Snake River near Rogersburg, Washington. Historically, the Grande Ronde River produced an abundance of salmonids including stocks of spring, summer and fall chinook salmon, sockeye salmon, coho salmon, and summer steelhead. During the past century, numerous factors have caused the reduction of salmon stocks such that only stocks of spring chinook salmon and summer steelhead remain. The sizes of spring chinook salmon populations in the Grande Ronde basin also have been declining steadily and are substantially depressed from estimates of historic levels. It is estimated that prior to the construction of the Columbia and Snake River dams, more than 20,000 adult spring chinook salmon returned to spawn in the Grande Ronde River basin. A spawning escapement of 12,200 adults was estimated for the Grande Ronde River basin in 1957. Recent population estimates have been variable year to year, yet remain a degree of magnitude lower than historic estimates. In 1992, the escapement estimate for the basin was 1,022 adults (2.4 {times} number of redds observed). In addition to a decline in population abundance, a constriction of spring chinook salmon spawning distribution is evident in the Grande Ronde basin. Historically, 21 streams supported spawning chinook salmon, yet today the majority of production is limited to eight tributary streams and the mainstem upper Grande Ronde River. Numerous factors are thought to contribute to the decline of spring chinook salmon in the Snake River and its tributaries. These factors include passage problems and increased mortality of juvenile and adult migrants at mainstem Columbia and Snake river dams, overharvest, and habitat degradation associated with timber, agricultural, and land development practices. More than 80% of anadromous fish habitat in the upper Grande Ronde River is considered to be degraded.

Keefe, M.; Anderson, D.J.; Carmichasel, R.W.; Jonasson, B.C.

1996-06-01T23:59:59.000Z

413

Improving the sampling efficiency of the Grand Canonical Simulated Quenching approach  

SciTech Connect

Most common atomistic simulation techniques, like molecular dynamics or Metropolis Monte Carlo, operate under a constant interatomic Hamiltonian with a fixed number of atoms. Internal (atom positions or velocities) or external (simulation cell size or geometry) variables are then evolved dynamically or stochastically to yield sampling in different ensembles, such as microcanonical (NVE), canonical (NVT), isothermal-isobaric (NPT), etc. Averages are then taken to compute relevant physical properties. At least two limitations of these standard approaches can seriously hamper their application to many important systems: (1) they do not allow for the exchange of particles with a reservoir, and (2) the sampling efficiency is insufficient to allow the obtention of converged results because of the very long intrinsic timescales associated with these quantities. To fix ideas, one might want to identify low (free) energy configurations of grain boundaries (GB). In reality, grain boundaries are in contact the grains which act as reservoirs of defects (e.g., vacancies and interstitials). Since the GB can exchange particles with its environment, the most stable configuration cannot provably be found by sampling from NVE or NVT ensembles alone: one needs to allow the number of atoms in the sample to fluctuate. The first limitation can be circumvented by working in the grand canonical ensemble (TV ) or its derivatives (such as the semi-grand-canonical ensemble useful for the study of substitutional alloys). Monte Carlo methods have been the first to adapt to this kind of system where the number of atoms is allowed to fluctuate. Many of these methods are based on the Widom insertion method [Widom63] where the chemical potential of a given chemical species can be inferred from the potential energy changes upon random insertion of a new particle within the simulation cell. Other techniques, such as the Gibbs ensemble Monte Carlo [Panagiotopoulos87] where exchanges of particles are attempted to equilibrate the chemical potential between two cells and hence allow for the calculation of coexistence curves, exploit the same idea: particle insertion (or exchange) is attempted and accepted with a Metropolis-like rule that depends exponentially on the energy change upon insertion. A well known limitation of this kind of approach is that the probability of accepting such a move decreases extremely rapidly with increasing density, due to the extremely large short-range repulsion between atoms. In response to these difficulties it became apparent that a solution to the problem might be to avoid abrupt insertions but instead to proceed gradually, so as to allow the system to react and make way for the incoming particle. In this view of things, the 'occupation' of a certain atomic site can be viewed as a continuous variable, ranging between 0 and 1, representing 'how much' of the particle is present at any given time. These ideas proved ideal in Molecular Dynamics (MD) settings because equations of motions for these occupation variables can sometimes be obtained. For example, in the case of Grand Canonical Molecular Dynamics [Cagin91], one special particle is allowed to have a fractional occupation. This can lead to either its destruction (occupation = 0) or its complex creation (occupation = 1) so as to enforce a given chemical potential. These approaches proved useful, but mostly in the liquid state where the probability of successfully inserting a new particle is sufficiently high. At higher densities, convergence proved to be hampered by very inefficient sampling. In this work, we explore the use of a related MD-based grand canonical technique, the Grand Canonical Simulated Quenching (GCSQ) of Phillpot and Rickman [Phillpot92,Phillpot94], and explore its application to the grand canonical sampling of solid state systems. We show that, in conjunction with advanced sampling techniques, GCSQ can be a useful tool to sample conformations of complex systems, such as GBs, and assist in the identification of their most stable states and/or most likely d

Perez, Danny [Los Alamos National Laboratory; Vernon, Louis J. [Los Alamos National Laboratory

2012-04-04T23:59:59.000Z

414

Grande Ronde Subbasin Gauging Station Operations, 2007-2008 Reporting Period.  

DOE Green Energy (OSTI)

The Grande Ronde Basin (GRB) in Northeast Oregon is a moderately dry climate receiving between 10 and 20 inches of precipitation per year with surrounding mountains accumulating up to 100 inches. Irrigated agriculture is a major part of the economy with water being diverted or pumped from surface and ground sources from April through October. Several ESA listed species exist in the basin including Chinook, steelhead, and bulltrout. Agriculture and ESA (Endangered Species Act) listed aquatic species combined with a dry climate demonstrate the need for a network of stream gauges. The GRB covers over 5,000 square miles and includes several thousand miles of perennial flowing streams. This project is in place to operate 12 existing stream gauges in combination with USGS (4 gauges) and OWRD (one gauge) who, independent of this project, operate five additional gauges (Grande Ronde at Troy, Imnaha R. at Imnaha, Minam R. at Minam, Lookingglass Creek, and Upper Catherine Cr.) to characterizes flow in both the Grande Ronde and Imnaha subbasins. These gauges are intended to assist in irrigation water management, fisheries management, long term flow and trend analysis, TMDL and SB1010 water quality management plan effectiveness, subbasin plan implementation, and provide essential information regarding cumulative effects response to conservation in the GRB. Headwater characteristics, land management influence, and basin outlet data are all selectively collected in this network of 17 flow gauges. Prior to the 2007 water year there were three separate stream gauging programs with similar objectives, protocol, and funding sources in the GRB. Each of these programs for the past ten years has operated under separate administration consuming more time and administrative money than is necessary to accomplish stated objectives. By combining all programs into one project costs have been reduced, each funding source has one contract instead of three, and the same amount of work has been done accomplishing the same objectives. This objective has been continued and realized in the 2008 water year.

Menton, R. Coby [Grande Ronde Model Watershed

2008-11-10T23:59:59.000Z

415

Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande  

Science Conference Proceedings (OSTI)

In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway and Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.

Farrar, C.R.; Baker, W.E.; Bell, T.M.; Cone, K.M.; Darling, T.W.; Duffey, T.A.; Eklund, A.; Migliori, A.

1994-06-01T23:59:59.000Z

416

Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

NONE

1997-07-01T23:59:59.000Z

417

Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado  

SciTech Connect

This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

NONE

1997-08-01T23:59:59.000Z

418

Select Economic Implications for the Biological Control of Arundo donax along the Rio Grande  

E-Print Network (OSTI)

Arundo donax, or giant reed, is a large, bamboo-like plant native to Spain that has invaded several thousand acres of the Rio Grande riparian in Texas. The plant grows to 18-24 feet, consuming large quantities of water per acre per year. With concern of increased water demands in the Texas Lower Rio Grande Valley region, the United States Department of Agriculture-Agricultural Research Service (USDA)ARS) is investigating four herbivorous insects as potential biological control agents for Arundo donax to facilitate increased water supply. This study examines select economic implications for agricultural water users in the United States of applying these biological control agents along the Rio Grande. The research includes (a) estimating the value of the water saved due to the reduction of Arundo donax, (b) a benefit-cost analysis, (c) regional economic impact analysis, and (d) an estimate of the per-unit cost of water saved over a 50-year planning horizon (2009 through 2058). The model ArundoEcon is used to perform a deterministic analyses using low- and high-marginal-composite acre values. Regional results indicate present values of farmlevel benefits ranging from $97.80 to $159.87 million. Benefit-cost ratios are calculated with normalized prices and range from 4.38 to 8.81. Sensitivity analyses provide a robust set of results for Arundo water use, replacement species water use, Arundo expansion rate after control, value of water, and the cost of the program. The pre-production processes and farm-gate economic impact analysis is estimated using multipliers from the IMPLAN model. Regional results reveal a range of $8.90 to $17.94 million annually in economic output and 197 to 351 new jobs for the year 2025. Further results show the cost per acre-foot of water saved is $44.08. This amount is comparable to other projects designed to conserve water in the region. The USDA)ARS, Weslaco, Texas Arundo donax biological control project realizes positive results for the benefit-cost ratios, economic impact analyses, and competitive results for the per-unit cost of saving water. These positive results indicate this project will have positive economic implications for the U.S. and the Texas Lower Rio Grande Valley.

Seawright, Emily Kaye

2009-08-01T23:59:59.000Z

419

Toward Net Energy Buildings: Design, Construction, and Performance of the Grand Canyon House  

DOE Green Energy (OSTI)

The Grand Canyon house is a joint project of the DOE's National Renewable Energy Laboratory and the U.S. National Park Service and is part of the International Energy Agency Solar Heating and Cooling Programme Task 13 (Advanced Solar Low-Energy Buildings). Energy consumption of the house, designed using a whole-building low-energy approach, was reduced by 75% compared to an equivalent house built in accordance with American Building Officials Model Energy Code and the Home Energy Rating System criteria.

Balcomb, J. D.; Hancock, C. E.; Barker, G.

1999-06-23T23:59:59.000Z

420

Results of the radiological survey at Diebold Safe Company, 1550 Grand Boulevard, Hamilton, Ohio (HO001)  

SciTech Connect

At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducted investigative radiological surveys at Diebold Safe Company, 1550 Grand Boulevard, Hamilton, Ohio in 1988 and 1989. The purpose of the surveys was to determine whether the property was contaminated with radioactive residues, principally {sup 238}U. The surveys included gamma scans; direct and transferable measurements of alpha, beta, and gamma radiation levels; and dust, debris, air, and soil sampling for radionuclide analyses. 6 refs., 6 figs., 5 tabs.

Foley, R.D.; Floyd, L.M.

1990-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 2008 Annual Report.  

DOE Green Energy (OSTI)

The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program is designed to rapidly increase numbers of Chinook salmon in stocks that are in imminent danger of extirpation in Catherine Creek (CC), Lostine River (LR) and upper Grande Ronde River (GR). Natural parr are captured and reared to adulthood in captivity, spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation. Presmolt rearing was initially conducted at Lookingglass Fish Hatchery (LFH) but parr collected in 2003 and later were reared at Wallowa Fish Hatchery (WFH). Post-smolt rearing is conducted at Bonneville Fish Hatchery (BOH - freshwater) and at Manchester Research Station (MRS - saltwater). The CC and LR programs are being terminated, as these populations have achieved the goal of a consistent return of 150 naturally spawning adults, so the 2005 brood year was the last brood year collected for theses populations. The Grande Ronde River program continued with 300 fish collected each year. Currently, we are attempting to collect 150 natural parr and incorporate 150 parr collected as eggs from females with low ELISA levels from the upper Grande Ronde River Conventional Hatchery Program. This is part of a comparison of two methods of obtaining fish for a captive broodstock program: natural fish vs. those spawned in captivity. In August 2007, we collected 152 parr (BY 2006) from the upper Grande Ronde River and also have 155 Grande Ronde River parr (BY 2006) that were hatched from eyed eggs at LFH. During 2008, we were unable to collect natural parr from the upper Grande Ronde River. Therefore, we obtained 300 fish from low ELISA females from the upper Grande Ronde River Conventional Program. In October 2008 we obtained 170 eyed eggs from the upper Grande Ronde river Conventional Hatchery Program. We will attempt to collect natural parr in August 2009. This year 752 fish were removed from the captive population: 629 fish survived to gamete production and 123 fish died from various causes prior to spawning. Growth of the Captive Broodstock fish was similar to previous years. The saltwater fish have grown more slowly than those reared in freshwater. A total of 720 fish were sorted as maturing and 629 (87.4%) of them survived to spawn. We collected gametes from 273 females and 350 males from the 2002-2006 brood years in 2008, using 111 spawning matrices and collected 474,187 green eggs (1,737 eggs/female). All ripe males were spawned and no semen was collected for cryo-preservation. Of the 474,187 eggs collected for the BY 2008 F1 generation, 448,373 (94.6%) survived to the eyed stage. 68,612 (15.3%) were culled from females with high ELISA OD values for BKD prevention. For BY 2007, we collected a total of 477,048 eggs from all three populations and 407,369 (85.4%) reached the eyed stage, while 95,024 eyed eggs (23.3%) were culled for BKD prevention. Eyed eggs were hatched at Lookingglass Fish Hatchery, producing 267,131 fry. As parr, 153,371 fish were coded-wire tagged (CWT). For the 2006 F1 brood year, we collected 177,890 eggs and 149,073 (83.8%) reached the eyed stage. 83,826 eyed eggs (56.2%) were culled at the eyed stage for BKD prevention. 61,044 fry were produced (93.6%), 53,688 (88 %) survived to smolt. There were 54 bacterial kidney disease (BKD) mortalities at BOH and MRS, combined in this reporting period. Overall, there were fewer BKD mortalities in 2008 due to a reduced number of fish coming into the Captive Broodstock Program and a shift away from collecting wild parr to using eyed eggs from low ELISA females from the Conventional Hatchery Program. Unknown causes of death accounted for 32 deaths at MRS and BOH, combined in 2008. We continually examine and modify the operations of the Captive Broodstock Program to make improvements wherever possible. We continue to have difficulty with prevention and treatment of BKD outbreak

Hoffnagle, Timothy L.; Hair, Donald; Gee, Sally

2009-03-31T23:59:59.000Z

422

PCB usage at the Grand Junction Area Office Facility. Final report  

Science Conference Proceedings (OSTI)

The development, implementation, and results of the polychlorinated biphenyl (PCB) identification project at the Grand Junction Area Office (GJAO) are summarized. Methodology for the PCB analysis is described, and results are tabulated. Of the 51 transformers and disconnects in use at GJAO, 15 unites were determined to be PCB-contaminated or filled with PCBs. This number falls within EPA's estimate of 25 to 40 percent of all transformers in use being at least contaminated. Approximately 324 gallons of PCBs and 515 gallons of PCB-contaminated fluids are being used currently. No contaminated transformers or disconnects are in a position to contaminate food or feed products at the facility.

Miller, M.E.; Donivan, S.

1982-06-01T23:59:59.000Z

423

LIST OF 361 ACORN COUNCIL AFFLILIATES, SUBSIDIARIES AN ALLIED ORGANIZATION (Note: The word ACORN is not always included in the associated entity name)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

361 ACORN COUNCIL AFFLILIATES, SUBSIDIARIES, AND ALLIED 361 ACORN COUNCIL AFFLILIATES, SUBSIDIARIES, AND ALLIED ORGANIZATIONS (Note: The word "ACORN" is not always included in the associated entity name) 1. Association of Community Organizations for Reform Now (ACORN) 2. ACORN National Office: Brooklyn, NY 3. ACORN Bronx, NY 4. ACORN Brooklyn, NY 5. ACORN Buffalo, NY 6. ACORN Hempstead, NY 7. ACORN HOUSING CORPORATION Brooklyn, NY 8. PROJECT VOTE Brooklyn, NY 9. MHANY Brooklyn, NY 10. ACORN National Office: Washington, D.C. 11. ACORN Washington, DC 12. ACORN HOUSING CORPORATION Washington, DC 13. ACORN Political 1334 G St, NW Suite B Washington, DC 20005 14. AISJ Washington, DC 15. ACORN National Office: Little Rock, AR 16. ACORN Pine Bluff, AR 17. ACORN Housing Corporation Little Rock, AR

424

Network discovery, characterization, and prediction : a grand challenge LDRD final report.  

SciTech Connect

This report is the final summation of Sandia's Grand Challenge LDRD project No.119351, 'Network Discovery, Characterization and Prediction' (the 'NGC') which ran from FY08 to FY10. The aim of the NGC, in a nutshell, was to research, develop, and evaluate relevant analysis capabilities that address adversarial networks. Unlike some Grand Challenge efforts, that ambition created cultural subgoals, as well as technical and programmatic ones, as the insistence on 'relevancy' required that the Sandia informatics research communities and the analyst user communities come to appreciate each others needs and capabilities in a very deep and concrete way. The NGC generated a number of technical, programmatic, and cultural advances, detailed in this report. There were new algorithmic insights and research that resulted in fifty-three refereed publications and presentations; this report concludes with an abstract-annotated bibliography pointing to them all. The NGC generated three substantial prototypes that not only achieved their intended goals of testing our algorithmic integration, but which also served as vehicles for customer education and program development. The NGC, as intended, has catalyzed future work in this domain; by the end it had already brought in, in new funding, as much funding as had been invested in it. Finally, the NGC knit together previously disparate research staff and user expertise in a fashion that not only addressed our immediate research goals, but which promises to have created an enduring cultural legacy of mutual understanding, in service of Sandia's national security responsibilities in cybersecurity and counter proliferation.

Kegelmeyer, W. Philip, Jr.

2010-11-01T23:59:59.000Z

425

Grand Junction Projects Office site environmental report for calendar year 1992  

SciTech Connect

This report presents information pertaining to environmental activities conducted during calendar year 1992 at the US Department of Energy Grand Junction Projects Office (DOE-GJPO) facility in Colorado. Environmental activities conducted at the GJPO facility during 1992 included those associated with environmental compliance, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. Four phases of the on-site Grand Junction Projects Office Remedial Action Project were completed in 1992. Remediation activities, which included the removal of 161,589 tons of uranium-mill-tailings-contaminated material from the facility, were conducted in compliance with all applicable permits. Off-site dose modeling for the GJPO was conducted to determine compliance with current National Emission Standards for Hazardous Air Pollutants, Subpart H, and applicable DOE Orders (5400.1 and 5400.5). The total off-site EDE to the public from all sources of radiation emanating from the facility (radon, air particulates, gamma) was calculated as 9 mrem/yr, which is well below the DOE dose limit of 100 mrem/yr above background. The radiological and nonradiological monitoring program at the GJPO facility included monitoring of activities that generate potentially hazardous or toxic wastes and monitoring of ambient air, surface water, and ground water.

Not Available

1993-05-01T23:59:59.000Z

426

Characterization of Pump Flow at the Grand Coulee Pumping Station for Fish Passage, 2004  

DOE Green Energy (OSTI)

This report describes a study conducted by PNNL for the Bonneville Power Administration to characterized the conditions fish experience when entrained in pump flow at the Grand Coulee Dam. PNNL used the Sensor Fish to measure the acceleration and pressure conditions that might be experienced by fish who are pulled through the pumps and turbines at Grand Coulee Dam's pump generation station and transported up into the feeder canal leading to Banks Lake. The probability that fish would be struck by the pump generating plant's new 9-bladed turbines was also calculated using Monte Carlo simulations. Our measurements showed relatively low turbulence except in the immediate vicinity of the runner environment. The highest pressure experienced by the Sensor Fish was estimated at 157 psi (the pressure gauge saturated at 155 psi). The probability of strike was also calculated, based on the average length of hatchery-reared juvenile kokanee (land-locked sockeye). Strike probabilities ranged from 0.755 for 2.36-inch fish to 0.3890 for 11.8-inch fish. The probability of strike estimates indicate that the majority (77%) of kokanne would be carried through the pump without being struck and most likely without injury resulting from pressure and turbulence exposure. Of the 23% that might be struck it is expected that 60% would arrive in Banks Lake without visible external injuries. Thus more than 90% of entrained fish would be expected to arrive in Banks Lake without injury.

Carlson, Thomas J.; Duncan, Joanne P.; Johnson, Robert L.

2005-03-31T23:59:59.000Z

427

KASCADE-Grande measurements of energy spectra for elemental groups of cosmic rays  

E-Print Network (OSTI)

The KASCADE-Grande experiment, located at KIT-Karlsruhe, Germany, consists of a large scintillator array for measurements of charged particles, N_ch, and of an array of shielded scintillation counters used for muon counting, N_mu. KASCADE-Grande is optimized for cosmic ray measurements in the energy range 10 PeV to 1000 PeV, thereby enabling the verification of a knee in the iron spectrum expected at approximately 100 PeV. Exploring the composition in this energy range is of fundamental importance for understanding the transition from galactic to extragalactic cosmic rays. Following earlier studies of elemental spectra reconstructed in the knee energy range from KASCADE data, we have now extended these measurements to beyond 100 PeV. By analysing the two-dimensional shower size spectrum N_ch vs. N_mu, we reconstruct the energy spectra of different mass groups by means of unfolding methods. The procedure and its results, giving evidence for a knee-like structure in the spectrum of iron nuclei, will be presente...

Fuhrmann, D; Arteaga-Velazquez, J C; Bekk, K; Bertaina, M; Bluemer, J; Bozdog, H; Brancus, I M; Cantoni, E; Chiavassa, A; Cossavella, F; Curcio, C; Daumiller, K; de Souza, V; Di Pierro, F; Doll, P; Engel, R; Engler, J; Fuchs, B; Gils, H J; Glasstetter, R; Grupen, C; Haungs, A; Heck, D; Hoerandel, J R; Huber, D; Huege, T; Kampert, K -H; Kang, D; Klages, H O; Link, K; Luczak, P; Ludwig, M; Mathes, H J; Mayer, H J; Melissas, M; Milke, J; Mitrica, B; Morello, C; Oehlschlaeger, J; Ostapchenko, S; Palmieri, N; Petcu, M; Pierog, T; Rebel, H; Roth, M; Schieler, H; Schoo, S; Schroeder, F G; Sima, O; Toma, G; Trinchero, G C; Ulrich, H; Weindl, A; Wochele, D; Wochele, J

2013-01-01T23:59:59.000Z

428

China Papers No. 6 Canada in Chinas Grand Strategy  

E-Print Network (OSTI)

www.conseilinternationalducanada.org China Papers No. 6 The twisted course of Sino-Canadian relations since the Harper Conservative government acceded to power in January 2006 has rightly focused attention on the foundations of our bilateral relationship. This paper ventures a look at the basis of the bilateral relationship from the Chinese perspective. It looks at the overall objectives of Chinas political and diplomatic strategy, how Chinese policy is made and the explicit and implicit place allotted to Canada within Chinas overall foreign policy. Canadas place in Chinas grand strategy will be approached from two directions: the role assigned to bilateral relations with Canada as found in various Chinese foreign policy announcements and the potential role for Canada within the overall objectives of Chinas grand strategy. The paper also looks at the scale of cooperation under present conditions versus the scope for cooperation that could be articulated as compatible with Chinas overall foreign policy objectives consistent with Canadian foreign policy goals and objectives. The Canadian experience is offset by brief comparisons with France and Australia and some suggestions are offered on how to anchor the bilateral relationship on a sounder and more stable framework that takes into account Canadas unique opportunities given Chinas changing place in the global balance.

Jeremy Paltiel

2010-01-01T23:59:59.000Z

429

Welcome to the Efficient Windows Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Window Selection Tool: New Construction Windows Window Selection Tool: New Construction Windows The Window Selection Tool will take you through a series of design conditions pertaining to your design and location. It is a step-by-step decision-making tool to help determine the most energy efficient window for your house. SELECT LOCATION: AK Anchorage AK Fairbanks AL Birmingham AL Mobile AR Little Rock AZ Flagstaff AZ Phoenix AZ Tucson CA Arcata CA Bakersfield CA Daggett CA Fresno CA Los Angeles CA Red Bluff CA Sacramento CA San Diego CA San Francisco CO Denver CO Grand Junction CT Hartford DC Washington DE Wilmington FL Daytona Beach FL Jacksonville FL Miami FL Tallahassee FL Tampa GA Atlanta GA Savannah HI Honolulu IA Des Moines ID Boise IL Chicago IL Springfield IN Indianapolis KS Wichita KY Lexington KY Louisville LA Lake Charles LA New Orleans LA Shreveport MA Boston MD Baltimore ME Portland MI Detroit MI Grand Rapids MI Houghton MN Duluth MN Minneapolis MO Kansas City MO St. Louis MS Jackson MT Billings MT Great Falls NC Raleigh ND Bismarck NE Omaha NH Concord NJ Atlantic City NM Albuquerque NV Las Vegas NV Reno NY Albany NY Buffalo NY New York OH Cleveland OH Dayton OK Oklahoma City OR Medford OR Portland PA Philadelphia PA Pittsburgh PA Williamsport RI Providence SC Charleston SC Greenville SD Pierre TN Memphis TN Nashville TX Brownsville TX El Paso TX Fort Worth TX Houston TX Lubbock TX San Antonio UT Cedar City UT Salt Lake City VA Richmond VT Burlington WA Seattle WA Spokane WI Madison WV Charleston WY Cheyenne AB Edmonton MB Winnipeg ON Toronto PQ Montreal SELECT HOUSE TYPE:

430

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects  

SciTech Connect

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

Spane, Frank A.

2013-04-29T23:59:59.000Z

431

Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 18, 2003 December 18, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) Ken Kirkman - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin Project No: 1998-007-03 Location: Union County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW). Description of the Proposed Action: The CTUIR and ODFW propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to

432

Impacts of the Cerro Grande fire on Homestead era and Manhattan Project properties at Los Alamos National Laboratory.  

SciTech Connect

In May of 2000, the Cerro Grande Fire burned approximately 8,000 acres of Department of Energy (DOE) managed land at the Los Alamos National Laboratory (LANL). Although the fire was generally of low intensity, it impacted a significant number of LANL's cultural resources. Historic wooden properties were affected more heavily than prehistoric archaeological sites. This paper will provide an overview of the Homestead and Manhattan Project Periods at LANL and will discuss the effects of the Cerro Grande Fire on historic wooden properties. Post-fire cultural resource management issues will also be discussed.

McGehee, E. D. (Ellen D.); Isaacson, J. (John)

2001-01-01T23:59:59.000Z

433

Scientific Grand Challenges: Crosscutting Technologies for Computing at the Exascale - February 2-4, 2010, Washington, D.C.  

SciTech Connect

The goal of the "Scientific Grand Challenges - Crosscutting Technologies for Computing at the Exascale" workshop in February 2010, jointly sponsored by the U.S. Department of Energys Office of Advanced Scientific Computing Research and the National Nuclear Security Administration, was to identify the elements of a research and development agenda that will address these challenges and create a comprehensive exascale computing environment. This exascale computing environment will enable the science applications identified in the eight previously held Scientific Grand Challenges Workshop Series.

Khaleel, Mohammad A.

2011-02-06T23:59:59.000Z

434

Impacts of the Cerro Grande fire on Homestead era and Manhattan Project properties at Los Alamos National Laboratory.  

SciTech Connect

In May of 2000, the Cerro Grande Fire burned approximately 8,000 acres of Department of Energy (DOE) managed land at the Los Alamos National Laboratory (LANL). Although the fire was generally of low intensity, it impacted a significant number of LANL's cultural resources. Historic wooden properties were affected more heavily than prehistoric archaeological sites. This paper will provide an overview of the Homestead and Manhattan Project Periods at LANL and will discuss the effects of the Cerro Grande Fire on historic wooden properties. Post-fire cultural resource management issues will also be discussed.

McGehee, E. D. (Ellen D.); Isaacson, J. (John)

2001-01-01T23:59:59.000Z

435

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

436

Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Planting 31,733 plants along 3.7 stream miles, (4) Establishing 71 new photopoints and retaking 254 existing photopoint pictures; (5) Monitoring stream temperatures at 12 locations on 6 streams; (6) Completing riparian fence, water gap and other maintenance on 100.5 miles of project fences. Since initiation of the project in 1984 over 68.7 miles of anadromous fish bearing streams and 1,933 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance

2003-08-01T23:59:59.000Z

437

A Geomorphological Assessment of Armored Deposits Along the Southern Flanks of Grand Mesa, CO, USA  

E-Print Network (OSTI)

A series of deposits, located along the southern flanks of Grand Mesa, Colorado, and extending to the south, are problematic, and the processes related to emplacement are not understood. The overall area is dominated by two landform systems, Grand Mesa, which supported a Pleistocene ice cap, and the North Fork Gunnison River drainage. Thus, one has to ask: Are these deposits the result of the melting of the ice cap or are they fluvial terraces associated with the evolution of the ancestral Gunnison River? The goal of this research was to map the areal extent of the deposits and to interpret the formation and climatic significance in understanding the evolution of the Pleistocene landscape in the region. An extensive exposure, parallel to State Highway 65 near Cory Grade, was used for detailed description and sampling. Three additional exposures, ~10 to 20 km (~6 to 12 mi) were used to extend the areal extent of sampling. The study area was mapped using aerial photography and traditional field mapping aided by GPS. From the field work, a detailed stratigraphic column, including lithology and erodability, was constructed. Vertical exposures of the deposits were described, mapped, and recorded in the field and using detailed photo mosaics. Samples were collected from each stratum of the deposits for grain-size, shape, and sorting analyses. Five distinct depositional facies were identified. Sieve analysis on collected samples shows that four distinct grain-sizes occur in the outcrops; coarse sand, very-coarse sand, granule, and pebble and boulder. Mean grain-sizes range from 0.0722 to 0.9617, -0.0948 to -0.9456, -1.0566 to -1.9053, and -2.0050 to -3.4643, respectively. Glacio-fluvial depositional environments were identified and supported with observations of sedimentary structures and clast composition. Two major environments of deposition are recorded in the deposits; fluvial deposits from glacial outburst floods, and debris flow deposits. Imbrication of clasts in the strata suggests the flow came from the direction of Grand Mesa to the north. Facies and subsequent sequences were constructed to portray evidence that supports the glacio-fluvial mode of deposition.

Brunk, Timothy J.

2010-05-01T23:59:59.000Z

438

l!Jm~~Ut~'1CV GrandChalienge",regardiessexl,'Cpt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,;,,,,,..<:,,) ,;,,,,,..<:,,) l!Jm~~Ut~'1CV GrandChalienge",regardiessexl,'Cpt tiide'rnJtlrsuant toP.,L 96-511,'asamended, and Natiunal i11lcnsifi.catiol1 capabHffies which yield.amatic cn~gf to a wide range chemical producti()n~ iB) High,. of stich inod refining, non.cmctallic.materials ·IKi[tHtle!tm4;ti. l't.~"<.4 u.an'~:1:;f:) .1.'<1 conventi onal hi gh jeat.!,\iltnillnl·l'AiJ1l~illl~t!l Recvvery - .... ,·"", :l~IWtlra.,;:c~ftjcjtl\tl'tsteaJn.PJtlfYd!uctio}jti!hilgh perr~lanceJllmacesand 5ustainability7 reduced ""liter and a carbQn t(lOtprint li)f indt.t,'}try; (D) Sustainable Manufacturing

439

Necessary conditions of the equivalence of canonical and grand canonical ensembles in Coulomb system thermodynamics  

SciTech Connect

It was found that the equivalence of the grand canonical and canonical ensembles for the Coulomb systems is possible only when charged particles of different types in calculating the physical quantities are considered as formally 'independent' ones, and the quasi-neutrality condition is used in the final stage of calculations. The phase equilibrium condition is obtained and the expression is derived for the isothermal compressibility of matter as a two-component Coulomb system, which corresponds to the known limit relations for static structure factors. On this basis, it is demonstrated that the critical point of matter, considering as the Coulomb system is determined from the condition of vanishing mean square of fluctuations of the total charge per unit volume.

Bobrov, V. B. [Joint Institute for High Temperatures, Russian Academy of Sciences, 13/19, Izhorskaia Str., Moscow 125412 (Russian Federation); Sokolov, I. M. [Institut fuer Physik, Humboldt-Universitaet zu Berlin, Newtonstrasse 15, D-12489 Berlin (Germany); Trigger, S. A. [Joint Institute for High Temperatures, Russian Academy of Sciences, 13/19, Izhorskaia Str., Moscow 125412 (Russian Federation); Institut fuer Physik, Humboldt-Universitaet zu Berlin, Newtonstrasse 15, D-12489 Berlin (Germany)

2012-06-15T23:59:59.000Z

440

Assessment of cover systems at the Grand Junction, Colorado, uranium mill tailings pile: 1987 field measurements  

SciTech Connect

Four Pacific Northwest Laboratory (PNL) scientists and a technician conducted an onsite evaluation of radon gas exhalation, water content profiles, and plant and animal intrusion for a series of cover systems located on the uranium mill tailings pile at Grand Junction, Colorado. These six plots were sampled extensively down to the radon control layer (e.g., asphalt or wet clay) for soil moisture content and permeability. Radon gas emission through the surface was measured. Soil samples were collected and analyzed in the lab for particle-size distribution, particle density, bulk density, and ambient water content. Prairie dog burrows were excavated to discover the extent to which they penetrated the barriers. Plant type, density, and cover characteristics were measured.

Gee, G.W.; Campbell, M.D.; Freeman, H.D.; Cline, J.F.

1989-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Are Uranus & Neptune responsible for Solar Grand Minima and Solar Cycle Modulation?  

E-Print Network (OSTI)

Detailed solar Angular Momentum (AM) graphs produced from the Jet Propulsion Laboratory (JPL) DE405 ephemeris display cyclic perturbations that show a very strong correlation with prior solar activity slowdowns. These same AM perturbations also occur simultaneously with known solar path changes about the solar system barycentre (SSB). The AM perturbations can be measured and quantified allowing analysis of past solar cycle modulations along with the 11,500 year solar proxy records (C14 & 10Be). The detailed AM information also displays a recurring wave of modulation that aligns very closely with the observed sunspot record since 1650. The AM perturbation and modulation is a direct product of the outer gas giants (Uranus & Neptune), this information gives the opportunity to predict future grand minima along with normal solar cycle strength with some confidence. A proposed a mechanical link between solar activity and planetary influence via a discrepancy found in solar/planet AM along with current AM pe...

Sharp, Geoff

2010-01-01T23:59:59.000Z

442

A Pedagogical Study of the Grand Unification Theorem with Realization of Some Standard Equations  

E-Print Network (OSTI)

The God Almighty Grand Unification Theory proposed by Oyibo to unify all known forces in nature and other possibly unknown force fields has remained controversial not just because of its ambitious claims but also because of its unconventional mathematical approach. He has adopted the mathematical approach from his experience at solving the Navier Stokes equations in fluid mechanics using invariance of an arbitrary function under a group of conformal transformations. However, this esoteric approach resulted in a sound mathematical formulation for the modelling philosophy of his theorem which is that since the fundamental characteristic of the universe is motion and motion can only be provided by force, then the universe could be viewed as a large force field. He then represented the conservation of this large force field at a given space time point in the universe by a set of generic equations from which he obtained his generic solutions whose specific applications depend on the initial/boundary conditions and other physical constraint conditions. An important achievement of the theorem methodology is that modelling with it is reduced to algebraic operations rather than differential equations for the most parts in previous methodologies. With this understanding from pedagogically studying the modelling philosophy and mathematics of the theorem, we have been able to recover from it simple standard equations such as in the Fermat principle for geometric optics. This is encouraging and therefore supports the possibility to recover more results and also to provide new ones, thereby supporting the theorem as a potential candidate for a grand unification theory.

Godfrey E. Akpojotor; Myron W. Echenim

2013-06-05T23:59:59.000Z

443

Use of a dynamic simulation model to understand nitrogen cycling in the middle Rio Grande, NM.  

Science Conference Proceedings (OSTI)

Water quality often limits the potential uses of scarce water resources in semiarid and arid regions. To best manage water quality one must understand the sources and sinks of both solutes and water to the river system. Nutrient concentration patterns can identify source and sink locations, but cannot always determine biotic processes that affect nutrient concentrations. Modeling tools can provide insight into these large-scale processes. To address questions about large-scale nitrogen removal in the Middle Rio Grande, NM, we created a system dynamics nitrate model using an existing integrated surface water--groundwater model of the region to evaluate our conceptual models of uptake and denitrification as potential nitrate removal mechanisms. We modeled denitrification in groundwater as a first-order process dependent only on concentration and used a 5% denitrification rate. Uptake was assumed to be proportional to transpiration and was modeled as a percentage of the evapotranspiration calculated within the model multiplied by the nitrate concentration in the water being transpired. We modeled riparian uptake as 90% and agricultural uptake as 50% of the respective evapotranspiration rates. Using these removal rates, our model results suggest that riparian uptake, agricultural uptake and denitrification in groundwater are all needed to produce the observed nitrate concentrations in the groundwater, conveyance channels, and river as well as the seasonal concentration patterns. The model results indicate that a total of 497 metric tons of nitrate-N are removed from the Middle Rio Grande annually. Where river nitrate concentrations are low and there are no large nitrate sources, nitrate behaves nearly conservatively and riparian and agricultural uptake are the most important removal mechanisms. Downstream of a large wastewater nitrate source, denitrification and agricultural uptake were responsible for approximately 90% of the nitrogen removal.

Meixner, Tom (University of Arizona, Tucson, AZ); Tidwell, Vincent Carroll; Oelsner, Gretchen (University of Arizona, Tucson, AZ); Brooks, Paul (University of Arizona, Tucson, AZ); Roach, Jesse D.

2008-08-01T23:59:59.000Z

444

Past Chairmen of the Conference  

Science Conference Proceedings (OSTI)

... 73rd 1988 Grand Rapids, MI D. Guensler, CA 74th 1989 Seattle, WA J. Bartfai, NY 75th 1990 Washington, DC F. Gerk, NM ...

2013-07-08T23:59:59.000Z

445

Model Performance of Downscaling 19992004 Hydrometeorological Fields to the Upper Rio Grande Basin Using Different Forcing Datasets  

Science Conference Proceedings (OSTI)

This study downscaled more than five years of data (19992004) for hydrometeorological fields over the upper Rio Grande basin (URGB) to a 4-km resolution using a regional model [fifth-generation Pennsylvania State UniversityNational Center for ...

J. Li; X. Gao; S. Sorooshian

2008-08-01T23:59:59.000Z

446

Submitted to HuffingtonPost.com Obama's Iran Nuclear Deadline: A Grand Bargain is Still Possible if Both Sides  

E-Print Network (OSTI)

nuclear program. Why then? For comparison sake, consider Pakistan and North Korea, two other states that recently developed nuclear weapons. Iran does not find itself in a situation like Pakistan, which, afterSubmitted to HuffingtonPost.com Obama's Iran Nuclear Deadline: A Grand Bargain is Still Possible

O'Donnell, Tom

447

Grand Challenges for Biological and Environmental Research: A Long-Term Vision  

SciTech Connect

The interactions and feedbacks among plants, animals, microbes, humans, and the environment ultimately form the world in which we live. This world is now facing challenges from a growing and increasingly affluent human population whose numbers and lifestyles are driving ever greater energy demand and impacting climate. These and other contributing factors will make energy and climate sustainability extremely difficult to achieve over the 20-year time horizon that is the focus of this report. Despite these severe challenges, there is optimism that deeper understanding of our environment will enable us to mitigate detrimental effects, while also harnessing biological and climate systems to ensure a sustainable energy future. This effort is advanced by scientific inquiries in the fields of atmospheric chemistry and physics, biology, ecology, and subsurface science - all made possible by computing. The Office of Biological and Environmental Research (BER) within the Department of Energy's (DOE) Office of Science has a long history of bringing together researchers from different disciplines to address critical national needs in determining the biological and environmental impacts of energy production and use, characterizing the interplay of climate and energy, and collaborating with other agencies and DOE programs to improve the world's most powerful climate models. BER science focuses on three distinct areas: (1) What are the roles of Earth system components (atmosphere, land, oceans, sea ice, and the biosphere) in determining climate? (2) How is the information stored in a genome translated into microbial, plant, and ecosystem processes that influence biofuel production, climate feedbacks, and the natural cycling of carbon? (3) What are the biological, geochemical, and physical forces that govern the behavior of Earth's subsurface environment? Ultimately, the goal of BER science is to support experimentation and modeling that can reliably predict the outcomes and behaviors of complex biological and environmental systems, leading to robust solutions for DOE missions and strategic goals. In March 2010, the Biological and Environmental Research Advisory Committee held the Grand Challenges for Biological and Environmental Research: A Long-Term Vision workshop to identify scientific opportunities and grand challenges for BER science in the coming decades and to develop an overall strategy for drafting a long-term vision for BER. Key workshop goals included: (1) Identifying the greatest scientific challenges in biology, climate, and the environment that DOE will face over a 20-year time horizon. (2) Describing how BER should be positioned to address those challenges. (3) Determining the new and innovative tools needed to advance BER science. (4) Suggesting how the workforce of the future should be trained in integrative system science. This report lays out grand research challenges for BER - in biological systems, climate, energy sustainability, computing, and education and workforce training - that can put society on a path to achieve the scientific evidence and predictive understanding needed to inform decision making and planning to address future energy needs, climate change, water availability, and land use.

Arkin, A.; Baliga, N.; Braam, J.; Church, G.; Collins, J; Cottingham, R.; Ecker, J.; Gerstein, M.; Gilna, P.; Greenberg, J.; Handelsman, J.; Hubbard, S.; Joachimiak, A.; Liao, J.; Looger, L.; Meyerowitz, E.; Mjolness, E.; Petsko, G.; Sayler, G.; Simpson, M.; Stacey, G.; Sussman, M.; Tiedje, J.; Bader, D.; Cessi, P.; Collins, W.; Denning, S.; Dickinson, R.; Easterling, D.; Edmonds, J.; Feddema, J.; Field, C.; Fridlind, A.; Fung, I.; Held, I.; Jackson, R.; Janetos, A.; Large, W.; Leinen, M.; Leung, R.; Long, S.; Mace, G.; Masiello, C.; Meehl, G.; Ort, D.; Otto-Bliesner, B.; Penner, J.; Prather, M.; Randall, D.; Rasch, P.; Schneider, E.; Shugart, H.; Thornton, P.; Washington, W.; Wildung, R.; Wiscombe, W.; Zak, D.; Zhang, M.; Bielicki, J.; Buford, M.; Cleland, E.; Dale, V.; Duke, C.; Ehleringer, J.; Hecht, A.; Kammen, D.; Marland, G.; Pataki, D.; Riley, M. Robertson, P.; Hubbard, S.

2010-12-01T23:59:59.000Z

448

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.  

DOE Green Energy (OSTI)

The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.

Crossley, Brian (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA); Lockwood, Jr., Neil W. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA)

2001-01-01T23:59:59.000Z

449

Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.  

SciTech Connect

The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

Creveling, Jennifer

1986-08-01T23:59:59.000Z

450

Measurements of air contaminants during the Cerro Grande fire at Los Alamos National Laboratory  

Science Conference Proceedings (OSTI)

Ambient air sampling for radioactive air contaminants was continued throughout the Cerro Grande fire that burned part of Los Alamos National Laboratory. During the fire, samples were collected more frequently than normal because buildup of smoke particles on the filters was decreasing the air flow. Overall, actual sampling time was 96% of the total possible sampling time for the May 2000 samples. To evaluate potential human exposure to air contaminants, the samples were analyzed as soon as possible and for additional specific radionuclides. Analyses showed that the smoke from the fire included resuspended radon decay products that had been accumulating for many years on the vegetation and the forest floor that burned. Concentrations of plutonium, americium, and depleted uranium were also measurable, but at locations and concentrations comparable to non-fire periods. A continuous particulate matter sampler measured concentrations that exceeded the National Ambient Air Quality Standard for PM-10 (particles less than 10 micrometers in diameter). These high concentrations were caused by smoke from the fire when it was close to the sampler.

Eberhart, Craig

2010-08-01T23:59:59.000Z

451

Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado  

SciTech Connect

This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney disposal site. The site is in Mesa County near Grand Junction, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects public health and safety and the environment. Before each disposal site may be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Cheney disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination that remedial action is complete and the NRC formally accepts this plan. This document describes the long-term surveillance program the DOE will implement to ensure that the Cheney disposal site performs as designed. The program is based on site inspections to identify potential threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

NONE

1997-04-01T23:59:59.000Z

452

The integral formalism and the generating function of grand confluent hypergeometric function  

E-Print Network (OSTI)

Biconfluent Heun function, a confluent form of Heun function [1,2], is the special case of Grand Confluent Hypergeometric (GCH) function [4] replacing $\\mu$ and $\\varepsilon \\omega $ by 1 and -q: this has a regular singularity at x=0, and an irregular singularity at infinity of rank 2 (see (50) in Ref.[21]). In this paper I will apply three term recurrence formula [3] to the integral formalism of GCH function including all higher terms of A_n's and the generating function of GCH polynomial in which makes B_n term terminated. I show how to transform power series expansion in closed forms of GCH function to integral formalism analytically. This paper is 10th out of 10 in series "Special functions and three term recurrence formula (3TRF)". See section 6 for all the papers in the series. The previous paper in the series describes the power series expansion in closed forms of GCH function and its asymtotic behaviours [26].

Yoon Seok Choun

2013-03-04T23:59:59.000Z

453

Assessing the local wind field at Sierra Grande Mountain in New Mexico with instrumentation  

DOE Green Energy (OSTI)

Six systems were installed on top of Sierra Grande, a nearly symmetrical mountain in New Mexico about halfway between Raton and Clayton, with a peak of 2659 m (8720 ft msl) standing over a wide mesa of approximately 1829 m (6000 ft msl). Two systems were on the peak, one at 10 m (33 ft) above the surface and the other at 20 m (66 ft) because the peak is often the most probable spot for the greatest wind energy. The two levels were needed to measure variations of speed with height. Four other systems with instruments at 10-m (33 ft) were located roughly north, east, south, and west from the center on secondary ridge lines to measure certain horizontal variations of the wind. The wind direction and speed were measured every 6 minutes, a time interval considerably shorter than the traditional 1 hour but long enough so that all WECS power outputs are expected to respond to these wind speed variations. All six systems were operated for a period of six months between 6 June 1979-5 December 1979.

Barnett, K.M.; Reynolds, R.D.

1981-05-01T23:59:59.000Z

454

Superfund Record of Decision (EPA Region 2): Grand Street Mercury Site, Hoboken, NJ, September 30, 1997  

SciTech Connect

This Record of Decision presents the selected remedial action for the Grand Street Mercury Site. The major components of the selected remedy include: permanent relocation of the former residents of the Site; continuation of temporary relocation of the former residents until permanent relocation has been implemented; historic preservation mitigation measures for the buildings at the Site, as appropriate; gross mercury decontamination of the buildings at the Site including recovery of available mercury, whenever possible; identification and abatement of asbestos in the buildings at the Site; removal and recovery of reusable fixtures, appliances, and recyclable scrap metal and other building components; demolition of the two buildings at the Site using measures to minimize releases of mercury into the environment; removal and off-site disposal of all demolition debris at EPA-approved facilities; sampling of soils at the Site; excavation and off-site disposal of contaminated soils at EPA-approved facilities; sampling of soils at off-site adjacent locations; sampling of groundwater at the Site; and assessment of off-site soil and groundwater data to evaluate the need for future remedial action.

1998-01-01T23:59:59.000Z

455

New capabilities in the HENP grand challenge storage access systemand its application at RHIC  

SciTech Connect

The High Energy and Nuclear Physics Data Access GrandChallenge project has developed an optimizing storage access softwaresystem that was prototyped at RHIC. It is currently undergoingintegration with the STAR experiment in preparation for data taking thatstarts in mid-2000. The behavior and lessons learned in the RHIC MockData Challenge exercises are described as well as the observedperformance under conditions designed to characterize scalability. Up to250 simultaneous queries were tested and up to 10 million events across 7event components were involved in these queries. The system coordinatesthe staging of "bundles" of files from the HPSS tape system, so that allthe needed components of each event are in disk cache when accessed bythe application software. The caching policy algorithm for thecoordinated bundle staging is described in the paper. The initialprototype implementation interfaced to the Objectivity/DB. In this latestversion, it evolved to work with arbitrary files and use CORBA interfacesto the tag database and file catalog services. The interface to the tagdatabase and the MySQL-based file catalog services used by STAR aredescribed along with the planned usage scenarios.

Bernardo, L.; Gibbard, B.; Malon, D.; Nordberg, H.; Olson, D.; Porter, R.; Shoshani, A.; Sim, A.; Vaniachine, A.; Wenaus, T.; Wu, K.; Zimmerman, D.

2000-04-25T23:59:59.000Z

456

Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report  

SciTech Connect

Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

Morris, R.

1996-05-01T23:59:59.000Z

457

Technical basis for radiological release of Grand Junction Office Building 2. Volume 1, dose assessment  

SciTech Connect

Building 2 on the US Department of Energy (DOE) Grand Junction Office (GJO) site is part of the GJO Remedial Action Program (GJORAP). During evaluation of Building 2 for determination of radiological release disposition, some inaccessible surface contamination measurements were detected to be greater than the generic surface contamination guidelines of DOE Order 5400.5 (which are functionally equivalent to US Nuclear Regulatory Commission [NRC] Regulatory Guide 1.86). Although the building is nominal in size, it houses the site telecommunications system, that is critical to continued GJO operations, and demolition is estimated at $1.9 million. Because unrestricted release under generic surface contamination guidelines is cost-prohibitive, supplemental standards consistent with DOE Order 5400.5 are being pursued. This report describes measurements and dose analysis modeling efforts to evaluate the radiation dose to members of the public who might occupy or demolish Building 2, a 2,480 square-foot (ft) building constructed in 1944. The north portion of the building was used as a shower facility for Manhattan Project uranium-processing mill workers and the south portion was a warehouse. Many originally exposed surfaces are no longer accessible for contamination surveys because expensive telecommunications equipment have been installed on the floors and mounted on panels covering the walls. These inaccessible surfaces are contaminated above generic contamination limits.

Morris, R.; Warga, J.; Thorne, D.

1997-07-01T23:59:59.000Z

458

Microsoft Word - CX-Olympia-GrandCoulee85-5RelocationFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Amanda Williams Project Manager - TEP-TPP-1 Proposed Action: Olympia-Grand Coulee Structure 85/5 Relocation Project Budget Information: Work Order #00291628 PP&A Project No.: PP&A 1984 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Olympia-Grand Coulee Structure 85/5 Relocation Project is located in King County, Washington, within the Mt. Baker-Snoqualmie National Forest (MBS), in BPA's Covington Operations and Maintenance District. Township, Range, and Section crossed by the proposed project are listed below:

459

peu de radium D. En outre, la liqueur contient encore la plus grande partie du radium D ;  

E-Print Network (OSTI)

ajoute ensuite un peu d'eau oxygénée. Au bout d'une heurte on a déjà un léger précipité dhy peroxyde d'uranium déter- mine sont déplacées aussi bien vers les petites que vers les grandes longueurs d'onde. Au

Paris-Sud XI, Université de

460

Final report of the radiological release survey of Building 30B at the Grand Junction Office Facility  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 30B and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Krauland, P.A.; Corle, S.G.

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "buffalo ny grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility  

SciTech Connect

The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedial action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.

Widdop, M.R.

1996-08-01T23:59:59.000Z

462

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2006-02-01T23:59:59.000Z

463

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

2003-09-01T23:59:59.000Z

464

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2005-11-01T23:59:59.000Z

465

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.  

DOE Green Energy (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee