Sample records for buck boulevard substation

  1. Substation automation problems and possibilities

    SciTech Connect (OSTI)

    Smith, H.L.

    1996-10-01T23:59:59.000Z

    The evolutionary growth in the use and application of microprocessors in substations has brought the industry to the point of considering integrated substation protection, control, and monitoring systems. An integrated system holds the promise of greatly reducing the design, documentation, and implementation cost for the substation control, protection, and monitoring systems. This article examines the technical development path and the present implementation problems.

  2. PUREX new substation ATR

    SciTech Connect (OSTI)

    Nelson, D.E.

    1997-05-12T23:59:59.000Z

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.

  3. Bidirectional buck boost converter

    DOE Patents [OSTI]

    Esser, A.A.M.

    1998-03-31T23:59:59.000Z

    A bidirectional buck boost converter and method of operating the same allows regulation of power flow between first and second voltage sources in which the voltage level at each source is subject to change and power flow is independent of relative voltage levels. In one embodiment, the converter is designed for hard switching while another embodiment implements soft switching of the switching devices. In both embodiments, first and second switching devices are serially coupled between a relatively positive terminal and a relatively negative terminal of a first voltage source with third and fourth switching devices serially coupled between a relatively positive terminal and a relatively negative terminal of a second voltage source. A free-wheeling diode is coupled, respectively, in parallel opposition with respective ones of the switching devices. An inductor is coupled between a junction of the first and second switching devices and a junction of the third and fourth switching devices. Gating pulses supplied by a gating circuit selectively enable operation of the switching devices for transferring power between the voltage sources. In the second embodiment, each switching device is shunted by a capacitor and the switching devices are operated when voltage across the device is substantially zero. 20 figs.

  4. Bidirectional buck boost converter

    DOE Patents [OSTI]

    Esser, Albert Andreas Maria (Niskayuna, NY)

    1998-03-31T23:59:59.000Z

    A bidirectional buck boost converter and method of operating the same allows regulation of power flow between first and second voltage sources in which the voltage level at each source is subject to change and power flow is independent of relative voltage levels. In one embodiment, the converter is designed for hard switching while another embodiment implements soft switching of the switching devices. In both embodiments, first and second switching devices are serially coupled between a relatively positive terminal and a relatively negative terminal of a first voltage source with third and fourth switching devices serially coupled between a relatively positive terminal and a relatively negative terminal of a second voltage source. A free-wheeling diode is coupled, respectively, in parallel opposition with respective ones of the switching devices. An inductor is coupled between a junction of the first and second switching devices and a junction of the third and fourth switching devices. Gating pulses supplied by a gating circuit selectively enable operation of the switching devices for transferring power between the voltage sources. In the second embodiment, each switching device is shunted by a capacitor and the switching devices are operated when voltage across the device is substantially zero.

  5. Electric power substation capital costs

    SciTech Connect (OSTI)

    Dagle, J.E.; Brown, D.R.

    1997-12-01T23:59:59.000Z

    The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

  6. Conference James F.Buckli

    ScienceCinema (OSTI)

    None

    2011-04-25T23:59:59.000Z

    L'association du personnel a le plaisir d'accueillir Mons. James F.Buckli, astronaute, né en 1947. Il a participé à la mission Space Lab D1 qui pour la première fois mettait 8 personnes sur orbite.L'ass.du pers. remercie aussi Gordon White(s) de la mission américaine d'avoir permis d'organiser cette conférence

  7. Ashland Area Support Substation Project

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  8. Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference

    SciTech Connect (OSTI)

    None

    2002-06-01T23:59:59.000Z

    Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

  9. Proceedings: Substation Equipment Diagnostics Conference IX

    SciTech Connect (OSTI)

    None

    2001-09-01T23:59:59.000Z

    Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The ninth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

  10. Wolf Point Substation, Roosevelt County, Montana

    SciTech Connect (OSTI)

    Not Available

    1991-05-01T23:59:59.000Z

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

  11. RECORD OF CATEGORICAL EXCLUSION DETERMINATION Hygiene Substation...

    Broader source: Energy.gov (indexed) [DOE]

    will occur within the existing, disturbed substation access roaddriveway. B. Number and Title of tile Categorical Exclusion Being Applied: (See text in 10 CFR 1021,...

  12. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

  13. Cyber Security in Smart Grid Substations

    E-Print Network [OSTI]

    Utrecht, Universiteit

    Cyber Security in Smart Grid Substations Thijs Baars Lucas van den Bemd Michail Theuns Robin van.089 3508 TB Utrecht The Netherlands #12;CYBER SECURITY IN SMART GRID SUBSTATIONS Thijs Baars T.Brinkkemper@uu.nl Abstract. This report describes the state of smart grid security in Europe, specifically the Netherlands

  14. 500-kV Central Ferry Substation ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Substation Y Y Central Ferry Substation T u c a n n o n R i v e r S n a k e R i v e r 12 U V 127 U V 127 U V 260 U V 261 12 Starbuck Starbuck W h i t m a n W h i t m a...

  15. Bacterial Monitoring for the Buck Creek Watershed 

    E-Print Network [OSTI]

    2008-01-01T23:59:59.000Z

    aquifer drawdown from vegetation and irrigation often reduce stream flow; however, several large pools and stretches of the stream retain water throughout the year, except during extreme drought. Base flow in the stream is typically sustained by small... map of the Buck Creek watershed 7 Major aquifers in Texas (Source: Texas Water Development Board) Groundwater Two aquifers, the Seymour and Blaine, underlie the Buck Creek watershed and supply the bulk of available groundwater. The Seymour...

  16. Earth resistivity measurement near substation ground grids

    SciTech Connect (OSTI)

    Lodwig, S.G.; Mateja, S.A. [ComEd, Chicago, IL (United States)

    1996-11-01T23:59:59.000Z

    Proper substation grounding grid design requires good, accurate soil resistivity measurements. This data is essential to model the substation ground grid to design a safe ground grid with a satisfactory ground grid resistance at minimum cost. For substations with several decades of service, there is some concern that a grid may have deteriorated, been damaged during equipment installation or excavation, or that initial soil resistivity measurements were lost or may not have been correctly performed. Ground grid conductors change the substation surface voltage distribution. Any voltage measurements taken at the complete substation will also vary from the tests made without conductors present. During testing, current was injected in the soil by probes placed near the ground grid. The current tends to follow the ground grid conductors since copper is a far better conductor than the soil it is placed in. Resistance readings near grids will be lower than readings in undisturbed soil. Since computer models were unavailable for many years, analyzing the effect of the grid conductors on soil resistivity measurements was very difficult. As a result, soil resistivity measurements made close to substations were of little use to the engineer unless some means of correcting the measured values could be developed. This paper will present results of soil resistivity measurements near a substation ground grid before and after a ground grid has been installed and describes a means of calculating the undisturbed soil model.

  17. Characterization of electromagnetic transients in power substations

    E-Print Network [OSTI]

    Goers, William Chester

    1980-01-01T23:59:59.000Z

    CHARACTERIZATION OF ELECTROMAGNETIC TRANSIENTS IN POWER SUBSTATIONS A Thesis by WILLIAM CHESTER CiOERS, JR. Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER... OF SCIENCE December 1980 Major Subject: Electrical Engineering CHARACTERIZATION OF ELECTROMAGNETIC TRANSIENTS IN POWER SUBSTATIONS A Thesis by WILLIAM CHESTER GOERS, JR. Approved as to style and content by: Dr. B. Don Russell (Chairman of Committee...

  18. Data collecting and processing for substation integration enhancement

    E-Print Network [OSTI]

    Jakovljevic, Sasa

    2004-09-30T23:59:59.000Z

    The issue of substation integration is recognized as a very important one ever since the process of technological development brought a multitude of new computer-based devices and functions into substation operation. During the relatively short time...

  19. Design, Simulation, and Analysis of Substation Automation Networks

    E-Print Network [OSTI]

    Kembanur Natarajan, Elangovan

    2012-07-16T23:59:59.000Z

    on the Substation Automation Systems (SAS). Substations are nodes in the smart grid infrastructure that help the in transportation of power by connecting the transmission and distribution lines. The SAS applications are con figured to operate with minimal human...

  20. Landowners lead successful Buck Creek restoration

    E-Print Network [OSTI]

    Boutwell, Kathryn S.

    2012-01-01T23:59:59.000Z

    of the watershed, according to Dr. John Sij, retired agronomist and former project leader at the Vernon center. ?#31;is e#27;ort veri#25;ed that bacteria levels periodi- cally reach problematic levels,? he said. Landowners lead successful Buck Creek...

  1. Bacterial Monitoring for the Buck Creek Watershed

    E-Print Network [OSTI]

    The “Bacterial Monitoring for the Buck Creek Watershed” project was developed in response to the creek’s listing on the Texas Water Quality Inventory and 303(d) List due to a bacterial impairment and subsequent total maximum daily load (TMDL...

  2. The Buck Institute Turned to Geothermal

    E-Print Network [OSTI]

    The Buck Institute Turned to Geothermal Heating and Cooling for Significant Savings on Energy with the goal of sustaining the healthy years of life... #12;Geothermal Exchange #12;§ Cooling Tower: One. Other Challenges to the Original Central Plant: #12;The geothermal well field replaces the cooling tower

  3. Buck CreekWatershed Protection Plan

    E-Print Network [OSTI]

    State Soil and Water Conservation Board (Project 06-11) U.S. Environmental Protection Agency Developed Conservation Board (Project 06-11) U.S. Environmental Protection Agency Investigating Agencies: Texas A&M Agri the Texas State Soil and Water Conservation Board and U.S. Environmental Protection Agency. Buck Creek

  4. Experiments at Substation No. 3 Angleton, Texas 1909-1916.

    E-Print Network [OSTI]

    Winters, N. E. (Nathaniel Elmer)

    1918-01-01T23:59:59.000Z

    . Jan. 1.. ...... ..... .... . ... Oct. 21.. 20 110 inches May 1. MIY 22. 1,151 1 not good -4lsike clover does not seem to be a good legume for this part of the State. It is a perennial? hew green the year round..., Inspector SUBSTATION NO. 1: Beeville Bee County I. E. COWART. M. S., ~upe2ntendent SUBSTATION NO. 2: Troup, Smith County W S HOTCHKISS Supertntendent SUBSTATION NO. 5: Angleton, Brszoria County N. E. WINTERS, M. S., Superintendent SUBSTATION NO. 4...

  5. Ashland Area Support Substation Project : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-06-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power & Light Company`s (PP&L) 115-kilovolt (kV) transmission lines and through PP&L`s Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP&L to allow transfer of three megawatts (MW`s) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP&L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  6. Utility programs for substation diagnostics development

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    This article is a brief overview of the opening remarks of the utility panel. These remarks developed a number of interesting substation diagnostic activities and concepts in which the electric utilities are engaged and outlined the considerations which must accompany development of diagnostic sensors and systems. These area include transformer diagnostics, circuit breaker diagnostics, and testing/cost of diagnostic systems.

  7. african dwarf buck: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a High Efficiency Three-Phase Buck Rectifier Engineering Websites Summary: -voltage DC (HVDC) distribution architecture in telecom and data centers was shown to have superior...

  8. african dwarf bucks: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a High Efficiency Three-Phase Buck Rectifier Engineering Websites Summary: -voltage DC (HVDC) distribution architecture in telecom and data centers was shown to have superior...

  9. Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

    SciTech Connect (OSTI)

    Ohler, C.K.

    1991-05-21T23:59:59.000Z

    The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

  10. Modeling and Simulating Blast Effects on Electric Substations

    SciTech Connect (OSTI)

    Lyle G. Roybal; Robert F. Jeffers; Kent E. McGillivary; Tony D. Paul; Ryan Jacobson

    2009-05-01T23:59:59.000Z

    A software simulation tool was developed at the Idaho National Laboratory to estimate the fragility of electric substation components subject to an explosive blast. Damage caused by explosively driven fragments on a generic electric substation was estimated by using a ray-tracing technique to track and tabulate fragment impacts and penetrations of substation components. This technique is based on methods used for assessing vulnerability of military aircraft and ground vehicles to explosive blasts. An open-source rendering and ray-trace engine was used for geometric modeling and interactions between fragments and substation components. Semi-empirical material interactions models were used to calculate blast parameters and simulate high-velocity material interactions between explosively driven fragments and substation components. Finally, a Monte Carlo simulation was added to model the random nature of fragment generation allowing a skilled analyst to predict failure probabilities of substation components.

  11. Report of Experiments at Substation No. 4, Beaumont, Texas.

    E-Print Network [OSTI]

    Laude, H. H. (Hilmer Henry)

    1919-01-01T23:59:59.000Z

    **W. T. CARTER, JR., B. S.: Chtej T. M. BUSHNELL. B. S.. Sod Suroegur W. B. FRANCIS. B. S.. Soil Sur~euor bondman I?. G. BREWER, B. S., Assisfanf Animal Hus- bandman -- , Soil Sur&yor SUBSTATIONS No. 1. Beeville, Bee County I. E. COWART. M. S... : 19 a.7mm ary ................................................. 20 [Blank Page in Original Bulletin] REPORT OF EXPERIMENTS, SUBSTATION NO. 4, ' BEAUMONT, TEXAS. Substation No. 4, located six miles west of Beaumont, in one of the largest rice...

  12. Benefits of Using Mobile Transformers and Mobile Substations...

    Broader source: Energy.gov (indexed) [DOE]

    Benefits of Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service: a Report to the United States Congress Pursuant to Section 1816 of the Energy...

  13. Environmental Assessment : Happy Valley [Substation Project].

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1982-05-01T23:59:59.000Z

    The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

  14. Progress Report Substation No. 5, Temple, Texas, 1910-1914.

    E-Print Network [OSTI]

    Killough, D.T. (David Thornton)

    1917-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 2 15 - MAY, 1917 PROGRESS REPORT, SUBSTATION NO. 5, TEMPLE, TEXAS . B. YOUNGBLOOD, DIRECTOR COLLEGE STATION, RRAZOS COUNTY, TEXAS. AGRICULTURAL AND MECHANICAL COLL ECE OF TEXAS W. B. BIZZELL... ............................................................................................... Term explres 192: MAIN STATION COMMITTEE L. J. HART, Chairman WILL A. MILLER, JR GOVERNING BOARD, STATE SUBSTATIONS P. L. DOWNS. Temple, President .................................................................................. Term expires 1911...

  15. Progress Report, Substation No. 8, Lubbock, Texas, 1909-1914.

    E-Print Network [OSTI]

    Karper, R. E. (Robert Earl)

    1917-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 219 SEPTEMBER, 1917 PROGRESS REPORT, SUBSTATION NO. 8, LUBBOCK, TEXAS B. YOUNGBLOOD, DIR.ECTOR COLLEGE STATION, BRAZOS COUNTY, TEXAS, AGRICULTURAL AND MECHANICAL COLLEGE OF TEXA W. B. BIZZELL... STATION COMMITTEE L. J. HART, Chairman 'WILL A. MILLER, JR. GOVERNING BOARD, STATE SUBSTATIONS P. L Downs President Temple ........ .............................................................................Term CHA ~LES RO~AN, Vice >resident,. AU...

  16. Progress Report, Substation No. 9, Pecos, Texas, 1910-1914.

    E-Print Network [OSTI]

    Jackson, J.W.

    1917-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION * BULLETIN NO. 221 NOVEMBER, 19 17 -- -- PROGR.ESS REPORT, SUBSTATION NO. 9, PECOS, TEXAS COLLEGE STATION, RRAZOS COUNTY, TEXAS. AUSTIN, TEXAS : VON BOECKMANN-JONES CO., PRINTERS, 1917 AGRICULTURAL...% .................................................................................................... F. M. LAW, Houston em expires 1923 MAIN STATION COMMITTEE L. J. HART. Chairman WILL A. MILLER, JR GOVERNING BOARD, STATE SUBSTATIONS p L DOWNS, Temple. President...

  17. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-02-01T23:59:59.000Z

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  18. Peak power tracking for a solar buck charger

    E-Print Network [OSTI]

    Cohen, Jeremy Michael, M. Eng. Massachusetts Institute of Technology

    2010-01-01T23:59:59.000Z

    This thesis discusses the design, implementation, and testing of a buck converter with peak power tracking. The peak power tracker uses a perturb and observe algorithm to actively track the solar panel's peak power point ...

  19. Operation of buck regulator with ultra-low input voltage

    E-Print Network [OSTI]

    Harris, Cory Angelo

    2014-01-01T23:59:59.000Z

    Based on the LTC3621 and LTC3624, the designed buck regulator proposed in this thesis aims to lower the allowed input voltage and increase efficiency compared to the original part without making significant changes to ...

  20. A Dual Supply Buck Converter with Improved Light Load Efficiency 

    E-Print Network [OSTI]

    Chen, Hui

    2013-05-02T23:59:59.000Z

    Power consumption is the primary concern in battery-operated portable applications. Buck converters have gained popularity in powering portable devices due to their compact size, good current delivery capability and high efficiency. However...

  1. APS team works smarter, cuts substation construction costs by 36%

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

  2. Sweet Potato Fertilizer Experiments at Substation No. 2, Troup.

    E-Print Network [OSTI]

    Hotchkiss, W. S.

    1921-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION AGRICULTURAL AND MECHANICAL COLLEGE OF TEXAS W. B. BIZZELL, President BULLETIN NO. 277 MARCH, 1921 SWEET POTATO FERTILIZER EXPERIMENTS AT SUBSTATION NO. 2; TROUP B. YOUNGBLOOD, DIRECTOR tmLLIU)E BTATION.... Pecos, Reeves County V. L. CORY, B. S., Superintendent No. 10. College Station, Rrazas County (Feedlng and Breedlng Substation) L. J. MCCALL, Superintendent No. 11. Nacogdoches, Nacogdoches County G. T. McN~ss, Superintendent **No. 12. Chillicothe...

  3. Progress Report Substation No.7, Spur, Texas, 1909-1914.

    E-Print Network [OSTI]

    Dickson, R.E.

    1917-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 2 18 SEPTEMBER, 1917 PROGRESS REPORT, SUBSTATION NO. 7, SPUR, TEXAS . , B. YOUNGBLOOD, DIRECTOR, COLLEGE STATION, BRAZOS COUNTY, TEXAS. AunlLuL I UKAL AIVD-~LIIAITYILAL LULLEECVPTE~A~ W. B.... ............................................... .Term expires 1923 F. M. LAW, Housto11.. ................................................. .Term expires 1923 MAIN STATION COMMITTEE L. J. HART. Chairman WILL A. MILLER, JR. GOVERNING BOARD, STATE SUBSTATIONS p. L. DOWNS, President, Temple...

  4. Progress Report Substation No. 1, Beeville, Texas, 1910-1914.

    E-Print Network [OSTI]

    Binford, E.E.

    1917-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION -- BULLETIN NO. 2 14 APRIL, 1917 .PROGRESS REPORT, SUBSTATION NO. 1, BEEVILLE, TEXAS B. YOUNGBLOOD, ,If. S., DIRECTOR COLLEGE STATION, BRAZOS COUNTY, TEXAS. [Blank Page in Original Bulletin] TEXAS....'AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 214 APRIL, 1917 PROGRESS REPORT, SUBSTATION NO. 1, BEEVILLE, TEXAS 1910-1914 E. E. BINFORD, B. S., Superintendent B. YOUNGBLOOD, $1. S., DIRI~CTOR COLLEGE STATION, BRAZOS COUNTY, TEXM. em- AUSTIN, TEXAS : VON...

  5. National SCADA Test Bed Substation Automation Evaluation Report

    SciTech Connect (OSTI)

    Kenneth Barnes; Briam Johnson

    2009-10-01T23:59:59.000Z

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  6. Boulevard Gardens, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass ConversionsSouthbyBoston Heights, Ohio:Boulevard Gardens, Florida: Energy

  7. Integrated substation looks like one RTU to dispatchers

    SciTech Connect (OSTI)

    Koch, W.

    1995-12-01T23:59:59.000Z

    Traditionally, supervisory control and data acquisition systems (Scada) use a master/slave arrangement. The master Scada computer polls individual circuit devices for information, or the devices may report (by exception) to the computer. The substation engineering department of Portland General Electric Co (PCE) is now pioneering a new arrangement in which all devices in a substation communicate with each other and a local computer over a data bus. A single communications line connects the Scada master to the same bus for control and/or monitoring. The new approach is known as a substation integration system (SIS). Thus, for a lower initial cost, substation integration: eliminates the need for redundant equipment - such as panel meters, annunciators, transducers, sequence-of-event recorders, auxiliary tripping relays. Scada RTU, control, and transfer switches; reduces control house size by 25% by reducing wiring and using panel space more efficiently; provides a standardized user interface for easy data access, both locally and remotely; is flexible and expandable because of its modularity and use of non-proprietary hardware and software; improves operability, maintainability and reliability through immediate access to key data; and, reduces overall life-cycle costs by reducing travel and outage time through remote access to substation information. 5 figs.

  8. A Dual Supply Buck Converter with Improved Light Load Efficiency

    E-Print Network [OSTI]

    Chen, Hui

    2013-05-02T23:59:59.000Z

    ................................................................................................ 1 1.2 Thesis Organization.................................................................................................. 3 2. BACKGROUND OF BUCK CONVERTER ................................................................ 4 2.1 DC-DC Converter... ...................................................... 2 Fig. 2. 1. A basic DC-DC converter ................................................................................... 5 Fig. 2. 2. Basic topology of a close loop linear regulator................................................... 6 Fig. 2. 3...

  9. Report on Experiments with Citrus Fruits at the Beeville Sub-station.

    E-Print Network [OSTI]

    Potts, A. T. (Arthur Tillman)

    1912-01-01T23:59:59.000Z

    !TEXAS AGRICULTURAL EXPERIMENT STATIONS BULLETIN No. 148. MAY, 1912. Report on Experiments With Citrus Fruits at The Bee- ville Sub-station A. T. POTTS, Superintendent Beeville Sub-station AUSTIN PRINTING COMPANY AUSTIN. TEXAS TEXAS... EXPERIMENT STATIONS. GOVERNING BOARD. 1 DIRECTOR OF STATIONS. ...................................... B. YOUNOBLOOD, M. S.. .College Station I SUPERINTENDENTS OF SUB-STATIONS. .................. E. E. BINFORD, Beeville Sub-station.. .Beeville, P:.e Cc...

  10. Design Considerations for a Large-Scale Wireless Sensor Network for Substation Monitoring

    E-Print Network [OSTI]

    Nasipuri, Asis

    effective monitoring applications for the substation using low-cost wireless sensor nodes that can sustainDesign Considerations for a Large-Scale Wireless Sensor Network for Substation Monitoring Asis University City Blvd. Charlotte, NC 28223 Luke Van der Zel and Bienvenido Rodriguez Substations Group EPRI

  11. Demo Abstract: Wireless Sensor Network for Substation Monitoring: Design and Deployment

    E-Print Network [OSTI]

    Nasipuri, Asis

    -voltage substations, lower installation cost, and utilization of the distributed pro- cessing capabilities of wirelessDemo Abstract: Wireless Sensor Network for Substation Monitoring: Design and Deployment Asis-Transmissions & Substations 9625 Research Drive Charlotte, NC 28262 {lvanderz,birodriguez} @epri.com Ralph McKosky, Joseph

  12. Report of Experiments at Substation No. 12, Chillicothe, Texas.

    E-Print Network [OSTI]

    Edwards, R. W.

    1919-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION AGRICULTURAL AND MECHANICAL COLLEGE OF TEXAS W. B. BIZZELL, President BULLETIN NO. 253 NOVEMBER, 1919 heport of Exoeriments at Substation . No. 12, iliicothe, Texas B. YOUNGBLOOD, DIRECTOR aOuEoE STATION... Survegor R. G. BRTWER, B. S., Assisfanf Animal Hus- W. B. FR~NCIS, B. S., Soil Surve~or banaman SUBSTATIONS No. 1. Beevillei Bee County I. E. CLU~ART, M. S., Superinfendent N6. 2. Tromp, Smith County W. S. HOTCHKISS, Superinfendenf No. 3. Angleton...

  13. Progress Report, Substation No. 11, Nacogdoches, Texas, 1909-1915.

    E-Print Network [OSTI]

    McNess, George Thomas

    1918-01-01T23:59:59.000Z

    I 2XAS AGRlCULrURAL EXPERIMENT STATION AGRICULTURAL AND MECHANICAL COLLEGE OF TEXAS W. B. BIZZELL, President BULLETIN NO. 237 NOVEMBER, 1918 Progress Report, Substation No. 1 1, Nacogdoches, Texas, 1909- 19 15 B. YOUNGBLOOD, DIRECTOR College.... T CARTER JR Chief J. F. ST~OUD. SO;[ ~;rve!,or NFAL GEARREALD Soil Survegor T. M. BUSHNELL, b. S., Soil Survey'r SUBSTATIONS No. 1. Beeville. Bee County No. 8 Lubbock Lubbock County I. E. COWART, M. S., Superintendent R'E KARPE~ B S Superintend D: L...

  14. Cotton Variety Experiments: Substation No. 3, Angleton, Texas

    E-Print Network [OSTI]

    Reynolds, E. B. (Elbert Brunner)

    1921-01-01T23:59:59.000Z

    TEXAS AfiRlCULTURAL EXPERIMENT STATION AGRICULTURAL AND MECHANICAL COLLEGE OF TEXAS ' W. B. BIZZELL, President BULLETIN NO. 274 FEBRUARY, 1921 DIVISION OF AGRONOMY COTTON VARIETY EXPERIMENTS SUBSTATION NO. 3, ANGLETON, TEXAS B. YOUNGBLOOD..... Chief SOIL SURVEY **W. T. CARTER. JR., B, S.. Chief T. M RTJRNNELL. R. S., Soil Surve~or H. W. HAWKER. Soil Sr~rneuar SUBSTATIONS No..l. Beeville. Bee County No. 8. Lubbock. Lubbock County I. E. COWART, M. S., Superintendent H. E. KARPER. B. S...

  15. Management and Control for Optimal Performance of the Heating Substation

    E-Print Network [OSTI]

    Yang, J.

    2006-01-01T23:59:59.000Z

    With the development of the scale of central heating, a higher managing level is needed for the heating substation. How to economize the more energy is the first factor that managers need to consider while ensuring the comfort of the heating...

  16. Management and Control for Optimal Performance of the Heating Substation 

    E-Print Network [OSTI]

    Yang, J.

    2006-01-01T23:59:59.000Z

    With the development of the scale of central heating, a higher managing level is needed for the heating substation. How to economize the more energy is the first factor that managers need to consider while ensuring the comfort of the heating...

  17. Compensated gain control circuit for buck regulator command charge circuit

    DOE Patents [OSTI]

    Barrett, David M. (Albuquerque, NM)

    1996-01-01T23:59:59.000Z

    A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit.

  18. Compensated gain control circuit for buck regulator command charge circuit

    DOE Patents [OSTI]

    Barrett, D.M.

    1996-11-05T23:59:59.000Z

    A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit. 5 figs.

  19. Adaptive control of bucking on harvesters to meet order book constraints

    E-Print Network [OSTI]

    Bolding, M. Chad

    models us- ing dynamic programming (DP) and shortest path/longest path network algo- rithms have been. An adaptive control heuristic was developed by imbedding an individual stem optimal bucking dynamicAdaptive control of bucking on harvesters to meet order book constraints Glen Murphy Hamish

  20. FLATNESS BASED CONTROL OF A BUCK-CONVERTER DRIVEN DC MOTOR

    E-Print Network [OSTI]

    Knobloch,Jürgen

    FLATNESS BASED CONTROL OF A BUCK-CONVERTER DRIVEN DC MOTOR Felix Antritter ,1 Peter Maurer Johann on the circuit and control design of a buck converter driven DC motor. The steps of design, as for example objective: tracking control of the DC motor's shaft angular velocity. The dynamic system composed from

  1. Design, Simulation, and Analysis of Substation Automation Networks 

    E-Print Network [OSTI]

    Kembanur Natarajan, Elangovan

    2012-07-16T23:59:59.000Z

    ] talks about modifying the slot time dynamically based on the type and the length of the packets. The idea of expanding smartgrid up to the consumer?s home resulted in anal- ysis of possibility of wireless protocols in smart grid. Reference [12...] describes the requirements for implementing smartgrid over wireless network and also enlists a few of the wireless protocols that could be used in smartgrid. Reference [13] was one of the rst papers to suggest using WLAN in substations. However...

  2. Substation based data interpretation techniques for improved power system management

    SciTech Connect (OSTI)

    Booth, C.; McDonald, J.R. [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering] [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering; Laycock, W.J.

    1997-04-01T23:59:59.000Z

    There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

  3. Uranium Analysis with X-ray Microscopy Research Team: Andrew Duffin, Jesse Ward, Gregory Eiden, Steven Smith, Bruce McNamara, Edgar Buck

    E-Print Network [OSTI]

    , Steven Smith, Bruce McNamara, Edgar Buck Key Collaborators: David Prendergast, David Shuh (LBNL) Purpose

  4. An Integrative Approach to Reliability Analysis of an IEC 61850 Digital Substation 

    E-Print Network [OSTI]

    Zhang, Yan 1988-

    2012-11-28T23:59:59.000Z

    the failures at the bay level translate to the substation level, first we describe the Failure Mode and Effect Analysis (FMEA). Subsequently we will describe the reliability model at the substation level using the results of this FMEA. 4.1 Signal Flow... Effects in HV Transformer Bay 4.3 Integration at the Substation Level Now we will use the results of the FMEA to analyze the impact at the substation level. Since IEC 61850 based SAS combines the modern communication and traditional physical...

  5. Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)

    Broader source: Energy.gov [DOE]

    This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

  6. Microsoft Word - CX-HeboSubstationA- FY13_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    Todd Nicholson Supervisory Civil Engineer - TELF-TPP-3 Proposed Action: Hebo Substation Access Road Maintenance Budget Information: Work Order 00270316 PP&A Project No.: 2784...

  7. Microsoft Word - CX-SnoKingSubstationExpansionFY12_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Marleau Project Manager - TEP-TPP-1 Proposed Action: Sno-King Substation Expansion Categorical...

  8. Critical Path Method (CPM) Scheduling, Basic Engineering, and Project Approach for Typical Substation Engineering-Procurement-Construction (EPC) Project

    E-Print Network [OSTI]

    Jamir, Dewan R.

    2006-05-19T23:59:59.000Z

    This Field Project provides an overview of the typical substation Engineering-Procurement-Construction (EPC) project delivery method, the work breakdown structure, activities and sequences in the Critical Path Method (CPM) schedule, basic substation...

  9. 351 Substation Demolition -- B Roll | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del(ANL-IN-03-032) -Less isNFebruaryOctober 2, 2014Energy,FNeed more4351 Substation

  10. Report of Progress at the Troupe Sub-Station, Smith County Texas.

    E-Print Network [OSTI]

    Hotchkiss, W.S.

    1909-01-01T23:59:59.000Z

    TEXAS AGRICULTUR 146-409-lorn [PERIMENT STATIONS BULLETIN NO. 121 FEBRUARY 1, 1909 REPORT OF PROGRESS AT THE TROUPE SUB-STATION, SMITH COUNTY, TEXAS W. H. HOTCHKISS, SUPERINTENDENT IN CHARGE POSTOFFICE COLLEGE STATION, BRAZOS COUNTY.... ..................................... C. W. CRISLER. .Chief Clerk. .................................. F. R. N~VAILLE. .Stenographer. ...................................... A. S. WARE.. .Stenographer. STATE SUBSTATIONS. ..................... H. H. HARRINGTON, Director. .College...

  11. Powerline Communication System for Monitoring and Supervision of Feeder Equipments for MV Substation Automation

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    into the substations by the utilities to integrate data from relays and Intelligent Electronic Devices (IEDs) and capitalize on the protection, control, metering, fault recording, communication functions available been designed and retrofitted into the substations by the utilities to integrate data from relays

  12. An extension to IEC 61850 for solving selectivity problem in electrical substations Mohamad Haffar*,

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    An extension to IEC 61850 for solving selectivity problem in electrical substations Mohamad Haffar to the new standard IEC 61850. We also present the development of new devices in electrical substation domain. OPNET is used as a simulation platform for evaluation of message timing. Keywords: IEC 61850

  13. Progress Report of Substation No. 4, Beaumont, Texas, 1909-1914.

    E-Print Network [OSTI]

    Laude, H. H. (Hilmer Henry)

    1916-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 200 DECEMBER, 1916 = PROGRESS REPORT, SUBSTATION NO. 4, BEAUMONT, TEXAS B. YOUWOBLOOD, DIRECTOR, ' COLLEGE STATION, BRAZOS COUNTY, TEXAS. TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO.... 200 DECEMBER, 191 6 PROGRESS REPORT, SUBSTATION NO. 4, BEAUMONT, TEXAS H. H. LAUDE, B. S., SUPERINTENDENT B. YOUNGBLOOD, DIRECTOR, COLLEGE STATION, BRAZOS COUNTY, TEXAS. - - AUSTIN, TEXAS : VON BOECKMANN- JONES CO., PRINTEBS, 1917...

  14. More Dakota texts: collections of Alanson Buck Skinner and Amos Oneroad

    E-Print Network [OSTI]

    Anderson, Laura Lee

    1993-01-01T23:59:59.000Z

    The Alanson Buck Skinner Collection of the Braun Research Library at Southwest Museum in Los Angeles contains the ethnology and folktales of Skinner's unpublished monograph on the Eastern Dakota. Skinner and his Wahpeton informant, Amos Oneroad...

  15. CEWEP -Confederation of European Waste-to-Energy Plants Boulevard Clovis 12A

    E-Print Network [OSTI]

    Columbia University

    CEWEP - Confederation of European Waste-to- Energy Plants Boulevard Clovis 12A B-1000 Brussels Tel incineration. That means that Waste-to-Energy (WtE) plants would be considered as performing energy recovery). Classifying WtE plants as recovery operations would in no way reduce these protection levels. Brussels, 13th

  16. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  17. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  18. HEMP-induced transients in electric power substations

    SciTech Connect (OSTI)

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M. (BDM International, Inc., Albuquerque, NM (United States))

    1992-02-01T23:59:59.000Z

    A nuclear detonation in or above the earth's atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  19. HEMP-induced transients in electric power substations. Final report

    SciTech Connect (OSTI)

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M. [BDM International, Inc., Albuquerque, NM (United States)

    1992-02-01T23:59:59.000Z

    A nuclear detonation in or above the earth`s atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T & D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  20. Synchrophasor Measurement Using Substation Intelligent Electronic Devices: Algorithms and Test Methodology

    E-Print Network [OSTI]

    Ren, Jinfeng

    2012-02-14T23:59:59.000Z

    This dissertation studies the performance of synchrophasor measurement obtained using substation Intelligent Electronic Devices (IEDs) and proposes new algorithms and test methodology to improve and verify their performance when used in power system...

  1. Requirements Specification for and Evaluation of an Automated Substation Monitoring System

    E-Print Network [OSTI]

    Automation, Intelligent Electronic Devices, Protective Relays, Automated Fault Analysis, Fault Location devices such as Digital Protective Relays (DPRs), Digital Fault Recorders (DFRs), PQ Meters (PQMs is closely related to the substation integration ­ which by integration of monitoring, protection and control

  2. An Integrative Approach to Reliability Analysis of an IEC 61850 Digital Substation

    E-Print Network [OSTI]

    Zhang, Yan 1988-

    2012-11-28T23:59:59.000Z

    In recent years, reliability evaluation of substation automation systems has received a significant attention from the research community. With the advent of the concept of smart grid, there is a growing trend to integrate more computation...

  3. Cotton Variety Experiments, 1912-1920, Substation No. 7, Spur, Texas.

    E-Print Network [OSTI]

    Freeman, George Fouche; Dickson, R. E

    1922-01-01T23:59:59.000Z

    TEXAS A6RICULTURAL EXPERIMENT STATION AGRICULTURAL AND MECHANICAL COLLEGE OF TEXAS W. B. BIZZELL, President BULLETIN NO. 288 FEBRUARY, 1922 DIVISION OF COTTON BREEDING COTTON VARIETY EXPERIMENTS, 1912-1920, SUBSTATION NO. 7, SPUR, TEXAS B..., Sorl Survegor H. V. GEIB, B. S., Soil Surveyor FEED CONTROL SERVICE B YOUNGBLOOD Ph D Director F.' D. FULLER, M. s.; ~xicf Inspecfor S. D. PEARCE, Inspector J. H. ROGERS, Inspecfor W. H. WOOD, Inspector SUBSTATIONS l%. 'l. Beeville Bee County...

  4. Progress Report, Texas Substation No. 6, Denton, Texas, 1909-14.

    E-Print Network [OSTI]

    Cory, V. L. (Vivian L.)

    1916-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 199 DECEMBER, 1916 PROGRESS REPORT, TEXAS SUBSTATION NO. 6, DENTON, TEXAS POSTOFFICE : COLLEGE STATION, BRAZOS COUNTY, TEXAS. - AUSTIN, TEXAS : VON BOECKMANN-JONES CO., PRINTERS, 1916.... [Blank Page in Original Bulletin] TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 199 DECEMBER, 1916 PROGRESS REPORT, TEXAS SUBSTATION NO. 6, DENTON, TEXAS V. L. CORY, B. S. . SUPERINTENDENT , . POSTOFFICE : COLLEGE STATION, BRAZOS COUNTY...

  5. Progress Report of Substation No. 3, Angleton, Texas, 1909-1914.

    E-Print Network [OSTI]

    Winters, N. E. (Nathaniel Elmer)

    1916-01-01T23:59:59.000Z

    TEXAS AGRICULTURAL EXPERIMENT STATION BULLETIN NO. 197 NOVEMBER, 1916 PROGRESS REPORT OF SUBSTATION NO. 3, ANGLETON, TEXAS POSTOFFICE : COLLEGE STATION, BRAZOS COUNTY, TEXAS. +sB AUSTIN, TEXAS : VON BOECKMANN-JONES CO., PRINTERS, 1916.... [Blank Page in Original Bulletin] TEXAS A(;RICULTURAl, EXPERIMENT STATION BULLETIN NO. 197 NOVEMBER, 1916 PROGRESS REPORT OF SUBSTATION NO. 3, ANGLETON, TEXAS N. E. WINTERS, B. S., SUPERINTENDENT POSTOFFICE : COLLEGE STATION, BRAZOS COUNTY, TEXAS...

  6. Electrical substation service-area estimation using Cellular Automata: An initial report

    SciTech Connect (OSTI)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01T23:59:59.000Z

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  7. Near Time-Optimal Transient Response in DC-DC Buck Converters Taking into Account the Inductor Current Limit

    E-Print Network [OSTI]

    -load transient responses [1-15]. In its simplest form, the TOC responds to a step load change with a singleNear Time-Optimal Transient Response in DC-DC Buck Converters Taking into Account the Inductor transient response of a DC-DC buck converter. The concept of current- limited, time-optimal control (CL

  8. Regenerative Braking for an Electric Vehicle Using Ultracapacitors and a Buck-Boost Converter

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    Regenerative Braking for an Electric Vehicle Using Ultracapacitors and a Buck-Boost Converter Juan for an Electric Vehicle has been simulated. The purpose of this device is to allow higher accelerations, similar in shape and size to a Chevrolet S-10. This vehicle was already converted to an electric car

  9. Explores Dam Removal Located in Southwest Ohio, Buck Creek and its

    E-Print Network [OSTI]

    Bogaerts, Steven

    OHIO Researcher Explores Dam Removal Located in Southwest Ohio, Buck Creek and its tributary, Beaver Creek, run through a series of low-head dams in Springfield, Ohio. Historically, the four dams of the four dams. This will help restore the natural flow of sediments and fish along the entire river

  10. Evaluation of SiC MOSFETs for a High Efficiency Three-Phase Buck Rectifier

    E-Print Network [OSTI]

    Tolbert, Leon M.

    -voltage DC (HVDC) distribution architecture in telecom and data centers was shown to have superior efficiency and reliability compared with the traditional AC architecture [1-2]. HVDC bus is usually set as 380 Vdc or 400 Vdc a high efficiency buck rectifier used in the first stage of HVDC architecture data center power supplies

  11. A BOUNDARY ELEMENT FORMULATION FOR THE COMPUTER DESIGN OF SUBSTATION I. Colominas, F. Navarrina, and M. Casteleiro

    E-Print Network [OSTI]

    Colominas, Ignasi

    A BOUNDARY ELEMENT FORMULATION FOR THE COMPUTER DESIGN OF SUBSTATION GROUNDING I. Colominas, F approach for the numerical com- putation of substation grounding systems is presented. In this general in the BEM formulation to reduce computational cost. While linear and parabolic leakage current elements

  12. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

    1996-08-01T23:59:59.000Z

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  13. Abstract--With the deregulation and restructuring of utility industry, many substation automation applications are being

    E-Print Network [OSTI]

    Program (ATP), Energy Management Systems (EMS), Intelligent Electronic Device (IED), Supervisory Control Control and Data Acquisition (SCADA) and Energy Management System (EMS) applications of substation of Power System Operation Using Advanced Algorithms and IEDs for On-Line Monitoring". Y. Wu and M

  14. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01T23:59:59.000Z

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  15. Vulnerability of Zigbee to Impulsive Noise in Electricity Substations S A Bhatti1

    E-Print Network [OSTI]

    Atkinson, Robert C

    (ISA) are particularly influential in the field of wireless industrial automation systems. Wireless-rate wireless communications. It has a wide range of, applications in home and industrial automation, automation deployed in a substation. 1. Introduction The use of wireless sensor networks (WSNs) for industrial

  16. Constraint Based Planning with Composable Substate Peter Gregory and Derek Long and Maria Fox

    E-Print Network [OSTI]

    Hammerton, James

    Constraint Based Planning with Composable Substate Graphs Peter Gregory and Derek Long and Maria a constraint-based model for cost-optimal plan- ning that uses global constraints to improve the inference to such problems combine search, inference and relaxation. In cost optimal planning, search and relaxation tech

  17. Myoglobin-CO Substate Structures and Dynamics: Multidimensional Vibrational Echoes and Molecular Dynamics

    E-Print Network [OSTI]

    Fayer, Michael D.

    Myoglobin-CO Substate Structures and Dynamics: Multidimensional Vibrational Echoes and Molecular to establishing the relationships between protein structure and protein function.1-5 Protein dynamics occur structural specificity to assign these dynamics to particular atomic motions. Computational tech- niques

  18. Texas A&M AgriLife Research and Extension Center at Amarillo 6500 Amarillo Boulevard, West | Amarillo, TX 79106

    E-Print Network [OSTI]

    Texas A&M AgriLife Research and Extension Center at Amarillo 6500 Amarillo Boulevard, West of the Texas A&M AgriLife Extension Service are open to all people without regard to race, color, sex, disability, religion, age, or national origin. The Texas A&M University System, U.S. Department

  19. The design, implementation and testing of data gathering instrumentation for measurement of electromagnetic interference in electric power substations

    E-Print Network [OSTI]

    Gerloff, Gary Wayne

    1983-01-01T23:59:59.000Z

    THE DESIGN, IMPLEMENTATION AND TESTING OF DATA GATHERING INSTRUMENTATION FOR MEASUREMENT OF ELECTROMAGNETIC INTERFERENCE IN ELECTRIC POWER SUBSTATIONS A Thesis by GARY WAYNE GERLOFF Submitted to the Graduate College of Texas AAM University... IN ELECTRIC POWER SUBSTATIONS A Thesis by GARY WAYNE GERLOFF Approved as to style and content by: B. Don Russell (Chairman of Committee) A. K. A IM Sallie She p rd (Member) August 1983 ABSTRACT The Design, Implementation and Testing of Data...

  20. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

  1. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  2. The varistor protected series capacitors at the 500 KV broadview substation

    SciTech Connect (OSTI)

    Barcus, J.M. (General Electric Co., Hudson Falls, NY (US)); Miske, S.A. Jr. (General Electric Co., Schenectady, NY (US)); Vitols, A.P. (General Electric Co., Pittsfield, MA (US)); Maynard, H.M. (Montana Power Co., Butte, MT (US)); Peterson, W.G. (Bonneville Power Admin., Portland, OR (US))

    1988-10-01T23:59:59.000Z

    Two 235 Mvar series capacitors have been successfully applied at the 500 kV Broadview substation of the Colstrip Transmission Project. The series capacitors have an overvoltage protection system based on metal oxide varistors. The system provides instantaneous bypass and reinsertion of the capacitors following external line section faults. The excellent performance of the equipment was demonstrated during staged fault tests performed in October, 1985. The banks have been in successful operation since January, 1986.

  3. Demonstration Assessment of LED Roadway Lighting: NE Cully Boulevard Portland, OR

    SciTech Connect (OSTI)

    Royer, Michael P.; Poplawski, Michael E.; Tuenge, Jason R.

    2012-06-29T23:59:59.000Z

    A new roadway lighting demonstration project was initiated in late 2010, which was planned in conjunction with other upgrades to NE Cully Boulevard, a residential collector road in the northeast area of Portland, OR. With the NE Cully Boulevard project, the Portland Bureau of Transportation hoped to demonstrate different light source technologies and different luminaires side-by-side. This report documents the initial performance of six different newly installed luminaires, including three LED products, one induction product, one ceramic metal halide product, and one high-pressure sodium (HPS) product that represented the baseline solution. It includes reported, calculated, and measured performance; evaluates the economic feasibility of each of the alternative luminaires; and documents user feedback collected from a group of local Illuminating Engineering Society (IES) members that toured the site. This report does not contain any long-term performance evaluations or laboratory measurements of luminaire performance. Although not all of the installed products performed equally, the alternative luminaires generally offered higher efficacy, more appropriate luminous intensity distributions, and favorable color quality when compared to the baseline HPS luminaire. However, some products did not provide sufficient illumination to all areas—vehicular drive lanes, bicycle lanes, and sidewalks—or would likely fail to meet design criteria over the life of the installation due to expected depreciation in lumen output. While the overall performance of the alternative luminaires was generally better than the baseline HPS luminaire, cost remains a significant barrier to widespread adoption. Based on the cost of the small quantity of luminaires purchased for this demonstration, the shortest calculated payback period for one of the alternative luminaire types was 17.3 years. The luminaire prices were notably higher than typical prices for currently available luminaires purchased in larger quantities. At prices that are more typical, the payback would be less than 10 years. In addition to the demonstration luminaires, a networked control system was installed for additional evaluation and demonstration purposes. The capability of control system to measure luminaire input power was explored in this study. A more exhaustive demonstration and evaluation of the control system will be the subject of future GATEWAY report(s).

  4. Efficiency Analysis of a High Frequency Buck Converter for On-Chip Integration with a Dual-VDD Microprocessor

    E-Print Network [OSTI]

    Friedman, Eby G.

    -VDD Microprocessor Volkan Kursun, Siva G. Narendra* , Vivek K. De* , and Eby G. Friedman Department of Electrical. Full integration of a high efficiency buck converter on the same die with a dual-VDD microprocessor of high performance microprocessors are the two primary reasons for implementing a dual-VDD microprocessor

  5. A three-level buck converter to regulate a high-voltage DC-to-AC inverter

    E-Print Network [OSTI]

    Schrock, Kenneth C

    2008-01-01T23:59:59.000Z

    A three-level buck converter is designed and analyzed, and shown to be suitable as a high-voltage down converter as a pre-regulation stage for a 600 watt DC-to-AC power inverter. Topology selection for the inverter is ...

  6. Mead Substation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20 mph on unimproved access routes. Project vehicles and equipment will be parked on pavement, existing roads, and previously disturbed areas, to the maximum extent feasible. 3....

  7. Abstract--The deployment of IEC61850 standard in the world of substation automation system brings to the use of

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Abstract-- The deployment of IEC61850 standard in the world of substation automation system brings to the use of specific strategies for architecture testing. To validate IEC61850 architecture, the first step. The second step consists in validating IEC61850 applications compliance according to the project

  8. A Hardware in the Loop module in an IEC61850 Co-Simulation Platform for advanced substation

    E-Print Network [OSTI]

    Boyer, Edmond

    A Hardware in the Loop module in an IEC61850 Co- Simulation Platform for advanced substation aspects, related to the IEC61850 requirements, should be tested and checked in order to validate architecture. The first aspect consists in validating the conformity of the IEC61850 implementation inside

  9. The Application of Planning to Power Substation Voltage Control Keith Bell, Andrew Coles, Maria Fox, Derek Long and Amanda Smith

    E-Print Network [OSTI]

    Coles, Andrew

    around iterative refinement. 1 Introduction1 The control of electricity distribution is a challenging, a reactive system at the sub- station is used to meet voltage target within this range, set for each time of the day. The reactive system makes use of the adjustable substation components (Wood & Wollenberg 1996

  10. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    SciTech Connect (OSTI)

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P. [ICF Kaiser Hanford Co., Richland, WA (United States); Eyre, L.E.; Dell, L.D.; Kelly, D.S. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-02-01T23:59:59.000Z

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes.

  11. Final environmental assessment for vegetation control at VHF stations, microwave stations, electrical substations, and pole yards

    SciTech Connect (OSTI)

    NONE

    1995-10-13T23:59:59.000Z

    Southwestern Power Adm. operates very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards for electric power transmission throughout AR, MO, and OK. Vegetation growth at the stations must be suppressed for safety of operation and personnel. Southwestern has been using a combination of mechanical/manual and herbicide control for this purpose; Federally- mandated reductions in staff and budgetary resources require Southwestern to evaluate all potentially efficient methods for vegetation control. Three alternatives were examined: no action, mechanical/manual control, and (proposed) a combination of mechanical/manual and herbicide control. Environmental impacts on air and water quality, wetlands, wildlife, endangered species, archaeological and other resources, farmland, human health, transportation, etc. were evaluated.

  12. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    SciTech Connect (OSTI)

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F. [High Voltage Direct Current Power Transmission Research Institute (NIIPT) (Russian Federation)

    2006-01-15T23:59:59.000Z

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.

  13. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    SciTech Connect (OSTI)

    Maguire, James; McNamara, Joseph

    2010-06-25T23:59:59.000Z

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and safer since it is now a programmed procedure versus the former written procedure that was still subject to human variation in the process.

  14. WireGL: A Scalable Graphics System for Clusters Greg Humphreys Matthew Eldridge Ian Buck Gordon Stoll Matthew Everett Pat Hanrahan

    E-Print Network [OSTI]

    Stanford University

    WireGL: A Scalable Graphics System for Clusters Greg Humphreys£ Matthew Eldridge£ Ian Buck£ GordonGL API to each node in a cluster, virtualizing multiple graphics accel- erators into a sort of virtual graphics, the familiarity and ordered semantics of OpenGL, and the scalability of clusters, we

  15. FINNIGAN WAY EAST BOULEVARD

    E-Print Network [OSTI]

    Rollins, Andrew M.

    -79 P-75 P-78 P-70 P-80 P-MRN P-29 Parking (Underground) VISITOR INFORMATION Lagoon P P Wade Leutner Center Bellflower Hall Denny's Alumni House Security North Annex Lincoln Storage Horsburg Wood Sears Tower Robbins Pytte Van Horn Field Wind Turbine Mt. Sinai Skills and Simulation Center Jack, Joseph

  16. FINNIGAN WAY EAST BOULEVARD

    E-Print Network [OSTI]

    Rollins, Andrew M.

    Storage (Future Home of think[box]) Horsburg Wood Sears Tower Robbins Pytte Van Horn Field Wind Turbine Mt-MRN P-29 Parking (Underground) VISITOR INFORMATION Lagoon P P Wade Leutner Fribley Carlton Stone Alumni

  17. rice boulevard Tennis Stadium

    E-Print Network [OSTI]

    Richards-Kortum, Rebecca

    Allen Business Center.............................2 President's Office Anderson Biological Laboratories, M.D.........................................................3 Anderson Hall, M Affairs Humanities Building.......................38 Dean of Humanities Jones College, Mary Gibbs

  18. rice boulevard tennis stadium

    E-Print Network [OSTI]

    Alvarez, Pedro J.

    , Vice President for Public Affairs, Vice President for Resource Development Anderson Biological Laboratories, M.D. .............................3 Anderson Hall, M........................................................ 31 Dean of Humanities Jones College, Mary Gibbs .............................................. 32

  19. A Bidirectional High-Power-Quality Grid Interface With a Novel Bidirectional Noninverted Buck Boost Converter for PHEVs

    SciTech Connect (OSTI)

    Onar, Omer C [ORNL

    2012-01-01T23:59:59.000Z

    Plug-in hybrid electric vehicles (PHEVs) will play a vital role in future sustainable transportation systems due to their potential in terms of energy security, decreased environmental impact, improved fuel economy, and better performance. Moreover, new regulations have been established to improve the collective gas mileage, cut greenhouse gas emissions, and reduce dependence on foreign oil. This paper primarily focuses on two major thrust areas of PHEVs. First, it introduces a grid-friendly bidirectional alternating current/direct current ac/dc dc/ac rectifier/inverter for facilitating vehicle-to-grid (V2G) integration of PHEVs. Second, it presents an integrated bidirectional noninverted buck boost converter that interfaces the energy storage device of the PHEV to the dc link in both grid-connected and driving modes. The proposed bidirectional converter has minimal grid-level disruptions in terms of power factor and total harmonic distortion, with less switching noise. The integrated bidirectional dc/dc converter assists the grid interface converter to track the charge/discharge power of the PHEV battery. In addition, while driving, the dc/dc converter provides a regulated dc link voltage to the motor drive and captures the braking energy during regenerative braking.

  20. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

  1. Type B Accident Investigation of the Serious Personal Injury while Doble Testing at the Western Area Power Administration Hayden Substation, May 19, 1999

    Broader source: Energy.gov [DOE]

    On May 19, 1999, at 10:31 a.m., four Western Area Power Administration (Western) employees were performing Doble testing on a circuit breaker at Hayden Substation in Routt County, Colorado. Three electricians were injured when the high-voltage lead (HVL) of the Doble test set encroached on the minimum approach distance to an energized part outside clearance boundaries, drawing arcing faults.

  2. Substation Equipment Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructure of All-Polymer. . ~0sFailureSubscribe to NewsInnovation

  3. UNIVERSITY BOULEVARD FAU Research Facility

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Harriet L.Wilkes Honors College FAU Research Facility Expansion Satellite Utility Plant Chiller Lift

  4. Sundial Substation Site Baxter Road Substation Site Casey Road

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructure of All-Polymer. .Energy8 Career DaySunShot News

  5. Development Administration By Alice Buck

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0andEnergyGlobal Nuclearof aDepartment-of Energy DetailedDetroit

  6. The Combustion Institute 5001 Baum Boulevard

    E-Print Network [OSTI]

    Tennessee, University of

    as applied to fuel cells and fuel processing, and combustion control including artificial neural networks. Fundamentals of micro-combustors, mesoscale combustion modeling and diagnostics, catalytic combustion

  7. Center for Transportation Analysis 2360 Cherahala Boulevard

    E-Print Network [OSTI]

    22725 Research Areas Freight Flows Passenger Flows Supply Chain Efficiency Transportation: Energy, aviation, schools, drinking water, wastewater, dams, solid waste, hazardous waste, navigable waterways

  8. NATIONAL SCIENCE FOUNDATION 4201 Wilson Boulevard

    E-Print Network [OSTI]

    Pasik-Duncan, Bozenna

    Directorate strongly encourages all of its grantees, including grantees from the Small Business Innovative

  9. Single Inductor Dual Output Buck Converter

    E-Print Network [OSTI]

    Eachempatti, Haritha

    2010-07-14T23:59:59.000Z

    of value 3V. The main focus areas are low cross regulation between the outputs and supply of completely independent load current levels while maintaining desired values (1.2V,1.5V) within well controlled ripple levels. Dynamic hysteresis control is used...

  10. Breezy Bucks I | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,BelcherBlundellBowles,EnergyBrazil: EnergyWindI Jump to:

  11. Breezy Bucks II | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,BelcherBlundellBowles,EnergyBrazil: EnergyWindI Jump

  12. The Atomic Energy Commission By Alice Buck

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCOSystems Analysis Success StoriesInvestigations andThe American Jobs Act

  13. Power Transformer Application for Wind Plant Substations

    SciTech Connect (OSTI)

    Behnke, M. R. [IEEE PES Wind Plant Collector System Design Working Group; Bloethe, W.G. [IEEE PES Wind Plant Collector System Design Working Group; Bradt, M. [IEEE PES Wind Plant Collector System Design Working Group; Brooks, C. [IEEE PES Wind Plant Collector System Design Working Group; Camm, E H [IEEE PES Wind Plant Collector System Design Working Group; Dilling, W. [IEEE PES Wind Plant Collector System Design Working Group; Goltz, B. [IEEE PES Wind Plant Collector System Design Working Group; Li, J. [IEEE PES Wind Plant Collector System Design Working Group; Niemira, J. [IEEE PES Wind Plant Collector System Design Working Group; Nuckles, K. [IEEE PES Wind Plant Collector System Design Working Group; Patino, J. [IEEE PES Wind Plant Collector System Design Working Group; Reza, M [IEEE PES Wind Plant Collector System Design Working Group; Richardson, B. [IEEE PES Wind Plant Collector System Design Working Group; Samaan, N. [IEEE PES Wind Plant Collector System Design Working Group; Schoene, Jens [IEEE PES Wind Plant Collector System Design Working Group; Smith, Travis M [ORNL; Snyder, Isabelle B [ORNL; Starke, Michael R [ORNL; Walling, R. [IEEE PES Wind Plant Collector System Design Working Group; Zahalka, G. [IEEE PES Wind Plant Collector System Design Working Group

    2010-01-01T23:59:59.000Z

    Wind power plants use power transformers to step plant output from the medium voltage of the collector system to the HV or EHV transmission system voltage. This paper discusses the application of these transformers with regard to the selection of winding configuration, MVA rating, impedance, loss evaluation, on-load tapchanger requirements, and redundancy.

  14. Line Rebuild, Relocation and Substation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your HomeLatestCenter (LMI-EFRC) -Choices toLee

  15. Water Quality Monitoring in the Buck Creek Watershed and Facilitation of Buck Creek Watershed Partnership

    E-Print Network [OSTI]

    Gregory, L.; Dyer, P.

    feral hog management, grazing management, nutrient management, riparian and stream ecosystem health, septic system operation and maintenance, soil and water testing, wildlife management, and well head protection and management. Utilizing existing...

  16. Water Quality Monitoring in the Buck Creek Watershed and Facilitation of Buck Creek Watershed Partnership 

    E-Print Network [OSTI]

    Gregory, L.; Dyer, P.

    2013-01-01T23:59:59.000Z

    ? 0.9453? 1.1125? ???? ?? 20373? 2.1046? 1.1364? ???? ?? 15811? ???? 3.951? ?? ?? 20376? ?? ?? ?? ?? ??No?data?available?due?to?dry?or?No?flow?conditions? ????No?flow?rate?measured?to?ensure?that?E.?coli?samples?holding?times?were?met? *N...

  17. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  18. 10015 S.W. Terwilliger Boulevard Portland, Oregon 97219

    E-Print Network [OSTI]

    and Benefits The Green Energy Institute at Lewis & Clark Law School respectfully submits the following comments: Methodology for Determining Quantifiable Environmental Costs and Benefits. The Green Energy Institute Northwest to adapt to changing federal and state regulations. With these goals in mind, the Green Energy

  19. 44 boulevard de Dunkerque 13572 Marseille cedex 02

    E-Print Network [OSTI]

    beneficio del Norte y el Sur, a una ética de colaboración entre las partes contratantes. Se esfuerzan para. 9) Copublicar y coeditar entre Norte y Sur, tanto como en el Norte y en el Sur, y reforzar la

  20. Northern Boulevard office district : urban design analysis and projections

    E-Print Network [OSTI]

    Rask, Walter S

    1985-01-01T23:59:59.000Z

    This thesis takes as its premise the proposition that the pattern of street rights-of-way (and, by implication, utility alignments), blocks and parcelization are together the strongest and most persistent determinants of ...

  1. 6040 Greenwood Plaza Boulevard Greenwood Village, Colorado 80111

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as the Lowry Bombing Range on behalf of the Colorado State Land Board. The upfront bonus of 137 Million and 88 well commitment will generate approximately 500 Million in...

  2. Campus Etterbeek Pleinlaan 2 Boulevard de la Plaine

    E-Print Network [OSTI]

    Einmahl, Uwe

    Regional Cycleroute Villo!: Fietsdelen Villo! : Bicycle sharing Cambio: Autodelen Cambio: Car sharing 5-park Infopunt studenten Student information HUB Gebouwen van de VUB Buildings of the VUB Parking Car

  3. Damien ERNST Address (Private) : Boulevard Emile de Laveleye, 213

    E-Print Network [OSTI]

    Ernst, Damien

    ;Reinforcement learning Energy Publications (by year) Note: All my publications can be downloaded from ORBI Power Systems Computation Conference (PSCC'14), Wroclaw, Poland, August 18-22, 2014. (7 pages). [153] "A, Poland, August 18-22, 2014. [152] "Bayes adaptive reinforcement learning versus off-line prior

  4. OORPOR^XnON 250 Long Beach Boulevard

    E-Print Network [OSTI]

    Kleinfeld, David

    into output beam of the illuminator even for short periods of time. The UV radiation can permanently damage with the operation of this Quartz Halogen Illuminator: HAZARDS DUE TO LIGHT OR RADIATION Do not look directly Model 77501 Fiber Optics Source for radiometric application shown with 77525 fiber optics cable. Model

  5. Riverton-Boulevard Park, Washington: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd Jump to: navigation,MazeOhio: Energy Resources Jump to:Information

  6. Evaluation of traits associated with bucking bull performance and behavior 

    E-Print Network [OSTI]

    Romero, Natasha Elizabeth

    2009-05-15T23:59:59.000Z

    rather than the desired uniformity that is a goal of the beef cattle industry. Relationships between coat color and temperament have been found in several species including cats, dogs, mink, rats, foxes, and fallow deer (e.g. Hemmer, 1990; Keeler... and Moore, 1961; Trut, 1999; Trapezov, 1997). The relationship between coat color and temperament was first described by Keeler and King, in 1942, in a study of the coat color-temperament interaction in Norway rats (Keeler and King, 1942). Five years...

  7. Big bucks not always needed for new business

    SciTech Connect (OSTI)

    Madison, Alison L.

    2011-07-10T23:59:59.000Z

    Monthly Economic Diversity column for Tri-City Herald (first 2 paragraphs pasted below): I think many of us at one time or another has at least wondered what self-employment would be like. Amidst romantic visions about easygoing schedules and the reduced pressure of not having to answer to someone else, the daydreaming eventually gives way to reality. What would my value proposition be? Where would I start? And would that secret trust fund indeed be revealed to me at the right moment to make it possible? Since for most of us that last question is little more than a pipe dream, the money dilemma is top of mind when it comes to the proposition of starting a business from scratch. But it doesn't have to dig to the bottom of your wallet or your net worth as was recently affirmed in a great Wall Street Journal article about starting successful companies on a shoestring budget.

  8. BUCKS COUNTY DEPARTMENT OF HEALTH RULES AND REGULATIONS

    E-Print Network [OSTI]

    Systems. 1.3 Purpose. The purpose of these Rules and Regulations is to establish minimum standards, such as the space between a drill hole and a casing pipe and a liner pipe. ANSI - American National Standards Institute. API - American Petroleum Institute. Aquifer ­ An underground geological formation that contains

  9. Bucks County, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable and

  10. The Substation of the Future: A Feasibility Study

    E-Print Network [OSTI]

    to recognize their postdoctoral researchers and graduate students that contributed to the research and creation

  11. Progress Report, Substation No. 2, Troup, Texas, 1901-1914.

    E-Print Network [OSTI]

    Hotchkiss, W.S.

    1917-01-01T23:59:59.000Z

    are sugge~tecl for home we. They are giren in the order in ~vhicl, tl~cy ripen aid ~houlcl give a goo& suc- ceqzion throu,ch tl~e sewon : l\\la~flowcr, TTictor, Xed Bird Cling, Alton, Tellow Swan, Cii~man, Slap13-. Hobson. Family Fa~~orite, Elbertd, Stell...

  12. Sweet Potato Fertilizer Experiments at Substation No. 2, Troup. 

    E-Print Network [OSTI]

    Hotchkiss, W. S.

    1921-01-01T23:59:59.000Z

    . S ." - .- .d 3 %" +J a gP U $ 3.89 5.74 2.25 6.00 4.93 - 5.75 9.14 7.59 A -- s 0 d 2-2 " a,. z'," c* o a.5 225 ;:CU f3 ........ 50.4 43.2 3.4 72.0 41.9 - 54.6 57.9 70.8' oa Ow* '. ka' #g,. i zg:: gb ................ $ 37..., in 1907, 1908, and 11, was 17.?'0, 28.66, and 10.74 inches, respectively. The soils on which these experiments were conducted are classed by 3 Bureau of Soils as Susquehanna fine sandy loam. This soil is tyish in color with a red plastic clay subsoil...

  13. Cotton Variety Experiments at Substation No. 2, Troup.

    E-Print Network [OSTI]

    Hotchkiss, W. S.; Johnson, P. R. (Paul Rufus)

    1930-01-01T23:59:59.000Z

    . ...................... ............................ Lone Star .................... Hawkln's Prolific.. .................. Cleveland Big Boll.. Lone Star ............................. Percentage of lint Results in 1917 No. of bolls per lb. Fifty-three varieties were tested in 1917, and data... Type Mebane or Triumph Truitt Rowden Lone Star Acala Half and Half The varieties tested each year are arranged in the tables according to their rank in yield of lint cotton. Tables 3 to 6, inclusive, give information on the percentage of lint...

  14. Proposed Transmission Towers Proposed New Substation Sites Proposed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marina Lacamas Lacamas Lake Park Lake Park Lacamas Lacamas Park Trail Park Trail Tarbell Trail Tarbell Trail T a r b e l l T r a i l T a r b e l l T r a i l Tarbell Tarbell...

  15. Corn Variety Experiments, Substation no. 3, Angleton, Texas.

    E-Print Network [OSTI]

    Reynolds, E. B. (Elbert Brunner)

    1921-01-01T23:59:59.000Z

    . omid, Soils H. SCHMIDT b. V. s Veterinarian E. B. REYNOLDS, M. S., Agronom~st, Small Grains D. H. BENP~~T. V. M. D.,Veferinarian E. W. GEYER. B. S., Agronomist; Farm Super iniendenl CHEMISTRY **SALOME COMSTOCK, B. S., Seed Analvd G S FRAPS...

  16. Detection of Periodic Beacon Loads in Electrical Distribution Substation Data

    SciTech Connect (OSTI)

    Hammerstrom, Donald J.; Guttromson, Ross T.; Lu, Ning; Boyd, Paul A.; Trudnowski, Daniel; Chassin, David P.; Bonebrake, Christopher A.; Shaw, James M.

    2006-05-31T23:59:59.000Z

    This research explores methods for identifying a whether a load is sending a signal to the utility SCADA system. Such a system can identify whether various loads are signialing using existing SCADA infrastructure, that is, without added, high cost communications infrastructure.

  17. Categorical Exclusion for Pinnacle Peak Substation PCB contaminated...

    Broader source: Energy.gov (indexed) [DOE]

    B, B1.17: "Removal of Polychlorinated biphenyl (PCB)-containing items, such as transformers and capacitors, PCB-containing oils flushed from transformers, PCB-flushing...

  18. Progress Report of Substation No. 12, Chillicothe, Texas, 1905- 1914.

    E-Print Network [OSTI]

    Edwards, R.W.

    1916-01-01T23:59:59.000Z

    of Chillicothe. In 1911 a new location of thirty acres was secured adjoining the townsite on the uorthmest and along the Fort Worth RT Denver City Railroad. This land was used until 1915, when a tract of one hundred acres, situated five miles southwest... it or acl- vocating its adoption by farmers. Some new plants, of course, show up so poorly that thej map be discarded after one trial, while it is difficult to place others even after growing them several Fears. In addition to the sorghums, a large...

  19. Microsoft Word - CX-ColumbiaREADaytonSubstationTap_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    7, 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Mike Normandeau Customer Account Executive - PSE-SPOKANE Proposed Action: Columbia Rural Electric...

  20. Microsoft Word - CX-Coos-CurryNorwaySubstation_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Shari Sundeen Public Utilities Specialist - TPC-TPP-4 Proposed Action: Line and load interconnection of...

  1. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised FindingDepartmentDepartment ofDepartment ofStatement | Department ofLarimer

  2. Variable Voltage Substation Electric Fire and Emergency Response |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group current C3EDepartmentDepartment of Energy Photo of a vaporDepartment of

  3. IEEE aims to improve seismic design of power substations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMFormsGasReleaseSpeechesHallNotSeventyTechnologies |

  4. Benefits of Using Mobile Transformers and Mobile Substations for Rapidly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergy Christopher| Department of EnergyRestoring

  5. Benefits of Using Mobile Transformers and Mobile Substations for Rapidly

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy:WhetherNovember 13, 2009OakDepartment ofThe employment and

  6. A complete and normalized 61850 substation (Smart Grid Project) | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifangwiki Home Jweers's APTAPFinal Report | OpenEnergy

  7. Microsoft Word - Tacoma-Raver-Substation-Antenna-CX.doc

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagement of the National NuclearRegulation;I07 Annual Plan091 Analysis

  8. Proposed Transmission Towers Proposed New Substation Sites Proposed Route Segments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 HgPromising MagnesiumDOE/RichlandStructure and

  9. Integrated, Low Voltage, DynamicallyIntegrated, Low Voltage, Dynamically Adaptive BuckAdaptive Buck--Boost ConverterBoost Converter

    E-Print Network [OSTI]

    Rincon-Mora, Gabriel A.

    Improvement in battery life Low voltage Single cell operation (Li-ion/NiCd/NiMH/Fuel Cell) Integrated frequency 1 MHz ± 20% Closed-loop bandwidth 50 kHz 1-dB step change response time 20 µsec Full-load efficiency 90 % Control signal Output voltageTpower_change Tresponse Time 1 dB Typical transient response

  10. Kingsborough Community College | Office of Continuing Education 2001 Oriental Boulevard | Brooklyn, N.Y. 11235

    E-Print Network [OSTI]

    Rosen, Jay

    Approved by the NYS Department of Motor Vehicles, this six-hour accident prevention seminar will enable you in penalties on your driver's license. *The $25 registration fee is waived for this course.Sponsored by the NYS sales or traditional sites like eBay, Etsy, Shopify, or by building a site from scratch. You will also

  11. DOE Fuel Cell Pre-Solicitiation Workshop Sheraton Denver West Hotel, 360 Union Boulevard, Lakewood, CO

    E-Print Network [OSTI]

    of South Carolina University of North Dakota Savannah River National Laboratory Next Energy Sandia National Participants List Organization Argonne National Laboratory Nuvera Michigan Technological University University of New Mexico 3M University of New Mexico 4D Power, LLC National Renewable Energy Laboratory Argonne

  12. National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393

    E-Print Network [OSTI]

    /TP-581-42292 February 2008 Renewable Systems Interconnection: Executive Summary B. Kroposki and R National Laboratories Albuquerque, New Mexico T. Key Electric Power Research Institute Palo Alto, the U.S. Department of Energy launched the Renewable Systems Interconnection (RSI) study during

  13. IRD Sige, 44, boulevard de dunkerque 13572 Marseille cedex 02 Cration d'entreprises -Innovation -Diasporas

    E-Print Network [OSTI]

    'Algérie, du Liban, du Maroc et de Tunisie établies en France. Il a pour ambition de : · promouvoir l Liban (10 %) et du Maroc (28 %), dans des domaines variés : · Services aux entreprises : 16

  14. IRD Sige, 44, boulevard de dunkerque -13572 Marseille cedex 02 Coopration scientifique -Mditerrane

    E-Print Network [OSTI]

    développement (IRD), Michel Laurent, se rendra au Maroc les 9 et 10 décembre 2013, afin de renforcer la 2008 entre le Gouvernement du Royaume du Maroc et le Gouvernement français. Bilan et perspectives de la Laurent, Benoît Lootvoet, représentant de l'IRD au Maroc, et Bertrand Commelin, conseiller de coopération

  15. IRD Sige, 44, boulevard de Dunkerque, 13572 Marseille cedex 02 Recherche & Innovation -Mditerrane

    E-Print Network [OSTI]

    niveau en provenance d'Algérie, d'Allemagne, d'Egypte, de France, d'Italie, du Liban, du Maroc, de en provenance d'Algérie, d'Allemagne, d'Egypte, de France, d'Italie, du Liban, du Maroc, de Tunisie

  16. IRD Sige, 44, boulevard de dunkerque 13572 Marseille cedex 02 United Nations Conference on Sustainable Development

    E-Print Network [OSTI]

    on Sustainable Development Rio+20: IRD and AIRD join forces Launch of the first scientific cooperation programme United Nations Conference on Sustainable Development (Rio+20), will take place in Brazil on 20 and 22 United Nations Conference on Sustainable Development, Rio+20 will offer the opportunity to report

  17. CEWEP -Confederation of European Waste-to-Energy Plants Boulevard Clovis 12A

    E-Print Network [OSTI]

    Recovered Fuel) as a fuel in both cement kilns and power plants, dedicated Biomass Energy Plants (BEP in Renewable Electricity and Heat in TWh across Europe AD ­ Anaerobic Digestion; SRF ­ Solid Recovered Fuel; BEP ­ Biomass Energy Plants; LFG ­ Landfill Gas; WtE ­ Waste-to-Energy 1 Excluding agricultural

  18. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    NONE

    1991-05-03T23:59:59.000Z

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  19. 2009 Update UCSF Planning Group GearyEuclid

    E-Print Network [OSTI]

    Lim, Wendell

    2727 Mariposa Street 19 3360 Geary Boulevard 20 250 Executive Park Boulevard 8 Hunters Point 9 Oyster

  20. Induction logging device with a pair of mutually perpendicular bucking coils

    DOE Patents [OSTI]

    Koelle, Alfred R. (Los Alamos, NM); Landt, Jeremy A. (Los Alamos, NM)

    1981-01-01T23:59:59.000Z

    An instrument is disclosed for mapping vertical conductive fractures in a resistive bedrock, magnetically inducing eddy currents by a pair of vertically oriented, mutually perpendicular, coplanar coils. The eddy currents drive magnetic fields which are picked up by a second, similar pair of coils.

  1. Best bang for your buck: GPU nodes for GROMACS biomolecular simulations

    E-Print Network [OSTI]

    Kutzner, Carsten; Fechner, Martin; Esztermann, Ansgar; de Groot, Bert L; Grubmüller, Helmut

    2015-01-01T23:59:59.000Z

    The molecular dynamics simulation package GROMACS runs efficiently on a wide variety of hardware from commodity workstations to high performance computing clusters. Hardware features are well exploited with a combination of SIMD, multi-threading, and MPI-based SPMD/MPMD parallelism, while GPUs can be used as accelerators to compute interactions offloaded from the CPU. Here we evaluate which hardware produces trajectories with GROMACS 4.6 or 5.0 in the most economical way. We have assembled and benchmarked compute nodes with various CPU/GPU combinations to identify optimal compositions in terms of raw trajectory production rate, performance-to-price ratio, energy efficiency, and several other criteria. Though hardware prices are naturally subject to trends and fluctuations, general tendencies are clearly visible. Adding any type of GPU significantly boosts a node's simulation performance. For inexpensive consumer-class GPUs this improvement equally reflects in the performance-to-price ratio. Although memory is...

  2. Sensorless Current Sharing in Digitally Controlled Two-Phase Buck DC-DC Converters

    E-Print Network [OSTI]

    current sharing [3-5, 9-11] and droop control [3, 6, 7]. Active current sharing relies on current sensing, droop control methods emulate a finite output resistance in each paralleled module in order

  3. A Dual-Supply Buck Converter with Improved Light-Load Efficiency

    E-Print Network [OSTI]

    Zhang, Chao

    2012-07-16T23:59:59.000Z

    Power consumption and device size have been placed at the primary concerns for battery-operated portable applications. Switching converters gain popularity in powering portable devices due to their high efficiency, compact sizes and high current...

  4. Fig. 1. The oversampled digital controller IC regulating the operation of the buck converter.

    E-Print Network [OSTI]

    Prodiæ, Aleksandar

    , Aleksandar Radi, and Aleksandar Prodi Laboratory for Power Management and Integrated SMPS, ECE Department for low-power switch-mode power supplies (SMPS) that achieves fast response with a minimized addition samples are used to calculate the change in duty ratio value that results in the fastest possible response

  5. Ubiquitous Growth of Paleoarchean Biofilms Recorded in White Chert Bands of the Buck Reef Chert 

    E-Print Network [OSTI]

    Sneed, Jonathan

    2014-12-11T23:59:59.000Z

    of photosynthetic microbial systems, these records were surveyed at multiple scales using novel hydrofluoric etching methods, translucent slabs cut to mm-scale thickness, Raman spectroscopy, and thin section analysis. I demonstrate that mat growth in the photic zone...

  6. A Dual-Supply Buck Converter with Improved Light-Load Efficiency 

    E-Print Network [OSTI]

    Zhang, Chao

    2012-07-16T23:59:59.000Z

    Power consumption and device size have been placed at the primary concerns for battery-operated portable applications. Switching converters gain popularity in powering portable devices due to their high efficiency, compact sizes and high current...

  7. An exploratory design of a 65 nm CMOS buck converter for maximum efficiency

    E-Print Network [OSTI]

    Lin, Doris, M. Eng. Massachusetts Institute of Technology

    2008-01-01T23:59:59.000Z

    Portable battery-operated consumer devices, such as mp3 players, cell phones, and digital cameras, are becoming ever more prevalent and so the need for long battery life is increasingly important. These small devices contain ...

  8. Clifton Stryker Buck, Ph.D. University of California -Santa Cruz cbuck@ucsc.edu

    E-Print Network [OSTI]

    Paytan, Adina

    Oceanographic Commission Baseline Contaminant Survey, Surface Water Iron Speciation Study) investigating contamination of Se and Ag in the North Pacific from Asian fossil fuel combustion. Env. Sci. & Tech, accepted

  9. Synchrophasor Measurement Using Substation Intelligent Electronic Devices: Algorithms and Test Methodology 

    E-Print Network [OSTI]

    Ren, Jinfeng

    2012-02-14T23:59:59.000Z

    chnages. Some This dissertation follows the style of IEEE Transactions on Power Delivery. 2 disturbances, for example faults and switching operations, produce discontinuous points such as steps... respectively have been developed in this laboratory [34]-[36]. The NIST steady-state calibration service tests PMUs for compliance with the parameter requirements in IEEE C37.118-2005. In the dynamic test, modulated signals with varying magnitude...

  10. Report of Progress with Citrus Fruits at the Beeville Sub-Station, Bee County.

    E-Print Network [OSTI]

    Waschka, S. A.

    1909-01-01T23:59:59.000Z

    . For the last five years, until the cold spell in January of this year, the coast belt has not been visited by weather severe enough to test the endurance of the citrus trees. In January past, the temperature went to freezing even at the coast, and down... as low as 20? to 24? over most of the citrus fruit belt. That the trees stood this temperature is a most encouraging circum? stance for the development of the industry. One of the most frequent inquiries coming to the Station relates to the type...

  11. Irish Potatoes: Results of Experiments at Troupe Sub-station, Smith County.

    E-Print Network [OSTI]

    Green, Edward C.

    1904-01-01T23:59:59.000Z

    and Director. ........................ R. H. HARRINGTON, M. S.. .Chemist. ....................... M. FRANCIS, D. V. M.. .Veterinarian. ............................... F. S. JOENSTON Agriculturist. ........................... E. J. KYLE, M. S.... .Horticulturi8t. ........................ F. R. MARSHALL. .Animal Busbandry. ....... E. DWIGHT SANDERSON, M. S. .Consulting Entomologist. ............ EDWARD C. GREEN, B. S.. .Assistant ~orticulturist. ............................ G. S. Fws. .Assist Chemist...

  12. EA-2013: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) and the Bureau of Land Management (BLM) are jointly preparing an EA that analyzes the potential environmental impacts of Western’s proposed use of...

  13. Energy Conservation Program of the Division of Substation and Control Engineering : An Interim Report.

    SciTech Connect (OSTI)

    ,

    1981-04-01T23:59:59.000Z

    Energy conservation projects undertaken by BPA that could benefit residential and commercial users and development of prototype equipment are described. Progress reports are presented and directions that the projects will take are indicated. The first projects presented are those being done at BPA's Midway Residential Community: studies on air infiltration and weatherization, and evaluation of such energy conservation measures as heat pump and solar water heaters. The next section involves an energy audit and retrofit program undertaken to reduce energy consumption in BPA's own buildings. The third section, also concerned with BPA's efforts to reduce internal energy consumption, presents the application of passive solar techniques to the design of new BPA buildings. The fourth section reports on a system developed to utilize waste thermal energy from transformers and solar energy for space heating and cooling. The fifth section also involves the development of a prototype system, one to monitor energy usage of industrial equipment. The final sections report on projects involving solar and wind energy, the Photovoltaic Applications Program, and the Mod-2 Wind Generator project at Goodnoe Hills. (MCW)

  14. A methodology for performance and compatibility evaluation of an all-digital substation protection system

    E-Print Network [OSTI]

    Portillo Urdaneta, Levi

    2007-04-25T23:59:59.000Z

    A power system protection system consists, at least, of an instrument trans- former, a protective device (relay), and a circuit breaker. Conventional instrument transformers bring currents and voltages from power network levels to much lower scaled...

  15. Assessing Power Substation Network Security and Survivability: A Work in Progress Report1

    E-Print Network [OSTI]

    Krings, Axel W.

    critical infrastructure systems identified was the electric power grid since this system supports all other: Cyber security, electric power security, assessment techniques 1. Introduction The on-going problem non-military infrastructures. Power grid vulnerabilities and mitigations were documented in the PCCIP

  16. Risk Analysis and Probabilistic Survivability Assessment (RAPSA): An Assessment Approach for Power Substation Hardening1

    E-Print Network [OSTI]

    Krings, Axel W.

    the US's vulnerability to cyber terrorism we need to ask two questions: Are there infrastructure targets terrorism? [7] Several authors believe overwelmingly that our infrastructure systems are vulnerable to cyber [7,23]. Examining the threat of cyber terrorism to the electric power industry raises several issues

  17. Microsoft Word - Chenoweth-Substation-3G-RS-CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    no new access roads will be required. The new tower will be consistent with the existing transmission lines, towers, and industrial infrastructure in the area, and will not impact...

  18. Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    January 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment...

  19. Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    24, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at...

  20. Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12...

    Broader source: Energy.gov (indexed) [DOE]

    12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement...

  1. ELECTRICAL SUBSTATION RELIABILITY EVALUATION WITH EMPHASIS ON EVOLVING INTERDEPENDENCE ON COMMUNICATION INFRASTRUCTURE.

    SciTech Connect (OSTI)

    AZARM,M.A.BARI,R.A.MUSICKI,Z.

    2004-01-15T23:59:59.000Z

    The objective of this study is to develop a methodology for a probabilistic assessment of the reliability and security of electrical energy distribution networks. This includes consideration of the future grid system, which will rely heavily on the existing digitally based communication infrastructure for monitoring and protection. Another important objective of this study is to provide information and insights from this research to Consolidated Edison Company (Con Edison) that could be useful in the design of the new network segment to be installed in the area of the World Trade Center in lower Manhattan. Our method is microscopic in nature and relies heavily on the specific design of the portion of the grid being analyzed. It extensively models the types of faults that a grid could potentially experience, the response of the grid, and the specific design of the protection schemes. We demonstrate that the existing technology can be extended and applied to the electrical grid and to the supporting communication network. A small subsection of a hypothetical grid based on the existing New York City electrical grid system of Con Edison is used to demonstrate the methods. Sensitivity studies show that in the current design the frequency for the loss of the main station is sensitive to the communication network reliability. The reliability of the communication network could become a more important contributor to the electrical grid reliability as the utilization of the communication network significantly increases in the near future to support ''smart'' transmission and/or distributed generation. The identification of potential failure modes and their likelihood can support decisions on potential modifications to the network including hardware, monitoring instrumentation, and protection systems.

  2. Irish Potatoes: Results of Experiments at Troupe Sub-station, Smith County. 

    E-Print Network [OSTI]

    Green, Edward C.

    1904-01-01T23:59:59.000Z

    considerably by rot, and had to replant. The absence of rot in the Station field was probably due to the previous treatment of the seed. The potatoes had been cut to two-eye pieces, sprinkled with fine air-slaked lime, and exposed to sun and air for several... days before planting. They were turned over each day and an occasional sifting of air-slaked lime given them. As a result of this treatment the cut surfaces were dry and well cured before planting. All plats were cultivated an equal number of times...

  3. Screening Level Characterization of Electrical Substation 411. DOE/OR/21548-154.

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7 AugustAFRICAN3u ;;;:: A'Salmon,

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    operating costs, and substation costs for substations thatsubstation, and are derived from a simple levelized-cost-of-above) transmission substation. Capital costs vary for the

  5. IRD Sige, 44, boulevard de dunkerque -13572 Marseille cedex 02 Cration d'entreprises -Innovation -Diasporas -Mditerrane

    E-Print Network [OSTI]

    amorçage pour créer leur entreprise en Algérie, au Liban, au Maroc et en Tunisie. PACEIM : de la recherche, ingénieurs, doctorants, en accueil universitaire en France et ressortissants d'Algérie, du Liban, du Maroc ou (CNRST, Maroc) et l'incubateur Berytech au Liban. Enfin, la cinquantaine de candidats présélectionnés à l

  6. IUPUI Financial Success Planning Action Tool IUPUI Office of Student Financial Services / 420 University Boulevard / Campus Center Suite 250

    E-Print Network [OSTI]

    Zhou, Yaoqi

    IUPUI Financial Success Planning Action Tool IUPUI Office of Student Financial Services / 420 EXPENSES = $ #12;IUPUI Financial Success Planning Action Tool IUPUI Office of Student Financial Services Scholarships (see OneStart) X = Private Scholarships X = Other (ex. GI Bill, Tuition Reimbursement) X = FAMILY

  7. Une immunit naturelle contre Ebola ? Institut de recherche pour le dveloppement -44, boulevard de Dunkerque, CS 90009

    E-Print Network [OSTI]

    désormais connus. Mais comment l'homme est-il contaminé exactement ? Pourquoi une épidémie se déclare manière significative d'une région à l'autre. Les zones de savane et de plaines affichent des taux

  8. SANTA CRUZ: OFFICE OF THE DEAN DIVISION OF PHYSICAL & BIOLOGICAL SCIENCES

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    of power relay protection upgrades at the Slug Substation and the Merrill Substation, there will be no PG

  9. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    line cost and substation costs. The resulting broad range inthe cost of all associated equipment such as substations,

  10. Field Experiments at McKinney Sub-Station and Wichita Falls Sub-Station with Wheat, Corn, Cotton, Grasses and Manures. Field Experiments at College Station with Corn, Cotton, Grasses, Peas and Manures.

    E-Print Network [OSTI]

    Connell, J. H.; Clayton, James

    1895-01-01T23:59:59.000Z

    Cracken . . ............................... Smooth . . . . . . . . 17 .18 ..... . 206 White Frack .................................. do ......... Hi.29 .... .. 207 Lebanon ................................... Bearded ........ 23.55 3.43. 208 Bodine E., 0. K. West .... . ................. Smooth...

  11. Design-Oriented Hopf Bifurcation Boundary in Parallel-Connected Buck Converters Under Democratic Current-Sharing Control

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    - cratic current sharing method [6], [8], [9]. In this method, a common reference current is generated from tightly. As a result, all mod- ules share the load current equally. In this paper, we attempt to study, an appropriate current sharing scheme is needed to ensure that the cur- rent drawn by the load is shared properly

  12. Digital Loss-Minimizing Multi-Mode Synchronous Buck Converter Control Angel V. Peterchev Seth R. Sanders

    E-Print Network [OSTI]

    Sanders, Seth

    transition among the modes. An on-line adaptive algorithm to optimize the SR timing, based on power loss reducing the switching losses. In modern portable applications, minimizing power loss at light load in the controller, or can be obtained on-line by dynamically minimizing the converter power loss via multi

  13. What'swrongwithUNESCO The new director-general needs to buck all expectations and transform the agency.

    E-Print Network [OSTI]

    Horton, Tom

    the agency. A s Nature went to press, Irina Gueorguieva Bokova, a Bulgarian diplomat,andFaroukHosny, Egypt on renewable energy. UNESCO has strengths to build on. Its water programme is large and flabby, but outside in its net- work of national offices, and UNESCO-branded field centres such as biosphere reserves

  14. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  15. Technical Information Exchange on Pyrolysis Oil: Potential for a Renewab;e Heating Oil Substation Fuel in New England

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMayDepartment ofEnergyTeam Cumberland »Department of

  16. aluminum electrolytic capacitors: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    include Switched Capacitor (SC) buck converter, Low Drop-Out voltage regulator (LDO), comparator and voltage reference. A high efficiency and extremely low ripple buck...

  17. aluminium electrolytic capacitors: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    include Switched Capacitor (SC) buck converter, Low Drop-Out voltage regulator (LDO), comparator and voltage reference. A high efficiency and extremely low ripple buck...

  18. AN OPTIMAL PATH CODING SYSTEM FOR DAWG LEXICON-HMM Alain Lifchitz*

    E-Print Network [OSTI]

    George Street, GPO Box 2434 bât. Copernic, 5, boulevard Descartes 75015 Paris, France Brisbane Q4001

  19. Some sororities and fraternities own or rent property. These organizations can be found at the following addresses: ACW.........Alpha Chi Omega: 2420 Nueces Street

    E-Print Network [OSTI]

    Johnston, Daniel

    ATW .........Alpha Tau Omega: 2317 Shoal Creek Boulevard BCQ.........Beta Chi Theta: 2305 Leon Street

  20. Maison des Sciences conomiques, 106-112 boulevard de L'Hpital, 75647 Paris Cedex 13 http://mse.univ-paris1.fr/Publicat.htm

    E-Print Network [OSTI]

    Boyer, Edmond

    at marginal cost. Formally, firms are supposed to minimize their costs and set their selling prices equal with the existence of marginal pricing equilibria or equilibria with general pricing rules in an economy. Furthermore, the free-disposal assumption is weaken, which allows to consider non positive prices. Finally, we

  1. Maison des Sciences conomiques, 106-112 boulevard de L'Hpital, 75647 Paris Cedex 13 http://mse.univ-paris1.fr/Publicat.htm

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    SCHUBERT 2006.40 halshs-00115685,version1-22Nov2006 #12;The optimal carbon sequestration in agricultural particulier la séquestration de carbone dans les sols. Les travaux existants qui étudient la sequestration sequestration in agricultural soils. Existing papers studying the optimal carbon sequestration recognize

  2. Maison des Sciences conomiques, 106-112 boulevard de L'Hpital, 75647 Paris Cedex 13 http://mse.univ-paris1.fr/Publicat.htm

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    'existence d'une courbe de Kuznets entre les normes et les inégalités de revenu pour 90 pays sur la période interpréter la courbe de Kuznets. Mots clefs : Normes fondamentales du travail, Inégalités, Courbe de Kuznets to effectively put in place labour standards. We then find a Kuznet curb between standards and income

  3. IRD Sige, 44, boulevard de Dunkerque, 13572 Marseille cedex 02 L'IRD et l'AFD signent un accord-cadre de partenariat pour unir leurs

    E-Print Network [OSTI]

    efficiente et optimisée au bénéfice des pays du Sud ». Pour Dov Zerah, Directeur général de l'AFD, « cet

  4. CITY OF SAINT PAUL 390 City Hall Telephone: 651-266-8510 Mayor Christopher B. Coleman 15 West Kellogg Boulevard Facsimile: 651-228-8513

    E-Print Network [OSTI]

    Minnesota, University of

    and the state's first solar-powered electric car charging station. Perched on the banks of the Mississippi River

  5. Usos y Aplicaciones de SIG en los Refugios de Vida Silvestre

    E-Print Network [OSTI]

    Gilbes, Fernando

    Cabo Rojo, Culebra, Desecheo, Buck Island, Green Cay, Sandy Point, Laguna Cartagena, Navassa y Vieques

  6. Behavior Research Methods, Instruments, & Computers 2004, 36 (2), 339-346

    E-Print Network [OSTI]

    responding in- creases (Belenky et al., 2003; Buck, 1976; Graeber, 1982; Mullaney, Kripke, Fleck, & Johnson

  7. Preprint of the paper "A General Formulation based on the Boundary Element Method for the Analysis

    E-Print Network [OSTI]

    Colominas, Ignasi

    cost) to the analysis of large grounding systems in electrical substations. In this paper we present a new Boundary Element formulation for substation grounding systems embedded in layered soils of the substation site. Obviously, from a technical (and

  8. FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH

    E-Print Network [OSTI]

    Lesieutre, Bernard

    2013-01-01T23:59:59.000Z

    communications in the substation Example Costs: Instrument115-kV “B” Substations SVC Unit Cost ($ Millions) Total115-kV “B” Substations SVC Unit Cost ($ Millions) Total SVC

  9. Approaches To Integrating A HIgh Penertration Of Solar PV and CPV Onto The Electrical Grid

    E-Print Network [OSTI]

    Hill, Steven Craig

    2013-01-01T23:59:59.000Z

    of way costs per acre. Substation costs also vary with size.the transmission and substation costs to produce a realisticRight of Way Cost Substation Cost AFUDC/ Overhead Cost Total

  10. Environmental Life-cycle Assessment of Passenger Transportation: A Detailed Methodology for Energy, Greenhouse Gas and Criteria Pollutant Inventories of Automobiles, Buses, Light Rail, Heavy Rail and Air v.2

    E-Print Network [OSTI]

    Chester, Mikhail; Horvath, Arpad

    2008-01-01T23:59:59.000Z

    $74,000 per mile. Total substations cost for the Muni systempower structure and substations construction costs have beenStructure ($M 1997 ) Cost of Substations ($M 1997 ) Caltrain

  11. Life-cycle Environmental Inventory of Passenger Transportation in the United States

    E-Print Network [OSTI]

    Chester, Mikhail V

    2008-01-01T23:59:59.000Z

    74,000 per mile.   Total  substations  cost  for  the  Muni structure  and  substations  construction  costs  have Structures ($M 1997 )  Cost of Substations ($M 1997 )  BART 

  12. Environmental Life-cycle Assessment of Passenger Transportation: A Detailed Methodology for Energy, Greenhouse Gas and Criteria Pollutant Inventories of Automobiles, Buses, Light Rail, Heavy Rail and Air

    E-Print Network [OSTI]

    Chester, Mikhail; Horvath, Arpad

    2007-01-01T23:59:59.000Z

    $74,000 per mile. Total substations cost for the Muni systempower structure and substations construction costs have beenStructure ($M 1997 ) Cost of Substations ($M 1997 ) Caltrain

  13. Microsoft Word - CX -Lewis County PUD metering_.doc

    Broader source: Energy.gov (indexed) [DOE]

    , Paul, and Napavine substations and Lewis County's PUD Glenoma Substation and Packwood Hydro and Cowlitz Falls Hydro facilities. Proposed activities include installing pulse...

  14. 2012 SG Peer Review - Recovery Act: KCP&L Green Impact Zone Smart...

    Broader source: Energy.gov (indexed) [DOE]

    Framework and Standards to accelerate industry adoption *IEC 61850 (substation protection & automation) *IEC 61850 (substation - control center) *DNPIP (field device to...

  15. Microsoft Word - Hopkins Ridge BAASA.doc

    Broader source: Energy.gov (indexed) [DOE]

    Maple Valley Substation and PSE's Talbot Substation. BPA would install audio isolation transformers at the cable crossconnect point to connect AGC suspend send and receive...

  16. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    substation, and are derived from a simple levelized-cost-substation, the capacity factor of the renewable resource, and financing parameters—including the capital structure, cost

  17. System Protection Control Craftman

    Broader source: Energy.gov [DOE]

    A successful candidate will perform preventative and corrective maintenance on protective relays, revenue meters, telemetering schemes, substation control systems and various kinds of substation...

  18. 30-MJ superconducting magnetic-energy-storage stabilizing system: an overview

    SciTech Connect (OSTI)

    Roger, J.D.; Boenig, H.J.; Dean, J.W.; Schermer, R.I.; Annestrand, S.A.; Hauer, J.F.; Miller, B.L.

    1983-01-01T23:59:59.000Z

    The 30-MJ superconducting magnetic-energy-storage (SMES) system was devised as an alternate means to modulate the Bonneville Power Administration (BPA) Pacific AC Intertie, a part of the Western US Power System, to prevent undamped power oscillations at 0.35 Hz that were observed to be associated with high power transmission. The SMES system was installed at the BPA Tacoma Substation and successfully operated as an experimental device to initiate tests to determine power system dynamics, to investigate their variability, to assess system response to SMES modulation with a major variable load, and to use SMES to develop stability-control techniques. The system has been operated at frequencies of 0.1 to 1.0 Hz at power levels of +- 8.3 MW with a parallel modulation of the converter bridges and up to 9.5 MW reactive power together with +- 4.5 MW real power in constant VAR mode with buck-boost modulation of the bridges. The coil has been charged at a maximum rate of 11.8 MW. Operation of the SMES system is now under BPA jurisdiction, and all hardware has been transferred to BPA.

  19. This paper extends the token flow model of Buck and Lee ([1],[2]), an analytical model for the behavior of dataflow

    E-Print Network [OSTI]

    this syn- chronous dataflow (SDF) paradigm. Since many digital signal processing algorithms have little to no data-depen- dent decision-making, SDF-based tools, and tools based on dataflow languages with SDF. Despite its limita- tions, SDF has some very desirable properties. It is there- fore desirable to extend

  20. Design, Construction and Performance of a Buck-Boost Converter for an Ultracapacitor-Based Auxiliary Energy System for Electric Vehicles

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    -Based Auxiliary Energy System for Electric Vehicles Micah Ortúzar, Juan Dixon (SM IEEE) and Jorge Moreno decades. Nevertheless, pure electric vehicles still have not achieved ranges comparable to that of gas in most electric batteries compared to that of gasoline, is resolved in hybrid vehicles by combining high

  1. Figure 1: A block diagram of a digitally controlled buck converter that incorporates self-tuning non-invasive ResrC estimator.

    E-Print Network [OSTI]

    Prodiæ, Aleksandar

    Prodi Laboratory for Power Management and Integrated SMPS ECE Department, University of Toronto, Toronto in the output voltage and require complex calculations, i.e. powerful processing unit. Such perturbations affect Power Digitally Controlled DC-DC Converters Aleksandar Radi, David Baik, Adrian Straka and Aleksandar

  2. A review of "Women, Property, and the Letters of the Law in Early Modern England." by Nancy E. Wright Margaret Ferguson A. R. Buck eds.

    E-Print Network [OSTI]

    Nancy M. Bunker

    2005-01-01T23:59:59.000Z

    and Cruel Sufferings Undergone by those Two Faithful Servants of God, Katherine Evans and Sarah Cheevers: La vicenda di due quacchere prigioniere dell?inquisizione di Malta. Pisa: Scuola Normale Superiore, 2003. xiv + 366pp. + 4 illus. 30,00. Paper... Fox. Making excel- lent use of archival sources from Rome, Pisa, Malta, Florence, Venice, the Vatican, and the British Library, as well as numerous other sources, Villani constructs an engaging narrative that traces the paths of Evans and Cheevers...

  3. Type B Accident Investigation Board Report of the January 20, 1998, Electrical Accident at the Casa Grande Substation,South of Phoenix, Arizona

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type-B Accident Investigation Board appointed by Michael S.Cowan, Chief Program Officer, Western Area Power Administration.

  4. Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement

    SciTech Connect (OSTI)

    VanBaalen, R.A.

    1995-02-01T23:59:59.000Z

    This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

  5. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  6. State Historic Preservation Office Concurrence Letter

    Broader source: Energy.gov [DOE]

    Abengoa Mojave Solar Project and Lockhart Substation Connection and Communication Facilities Upgrade, San Bernardino County, California

  7. Cotton Production in Far West Texas with Emphasis on Irrigation and Fertilization.

    E-Print Network [OSTI]

    Longenecker, D. E. (Donald E.); Thaxton, E. L.; Lyerly, P. J. (Paul J.)

    1963-01-01T23:59:59.000Z

    production have not even been ap- *Respectively, associate agronomist, Substation No. 17, El Paso, Texas; associate agronomist, Substation No. 9, Pecos, Texas; and superintendent and research coordina- tor, Substation No. 17, El Paso, Texas. proached... on Cotton Yields 5 ....................................................................... Substation 17 5 ................................................................................. Fabens 6 Pecos...

  8. Environmental Life-cycle Assessment of Passenger Transportation: A Detailed Methodology for Energy, Greenhouse Gas and Criteria Pollutant Inventories of Automobiles, Buses, Light Rail, Heavy Rail and Air v.2

    E-Print Network [OSTI]

    Chester, Mikhail; Horvath, Arpad

    2008-01-01T23:59:59.000Z

    Substation Production Track Maintenance Insurances Fuels Electricity Production California Mix Massachusetts

  9. Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

    E-Print Network [OSTI]

    issues. Two are substation sites for Southern California Edison, and one substation site is for Pacific Pacific Gas and Electric Company's Midway Substation and Southern California Edison's substation sites type of electric energy storage plant that is the lowest cost and uses commercially available

  10. Who Gets Public Goods? Using Satellite Imagery to Measure the Distribution of Rural Electrification

    E-Print Network [OSTI]

    Min, Brian

    2007-01-01T23:59:59.000Z

    cost investments in infrastructure including new power plants, long haul transmission lines, substations, and

  11. Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions

    E-Print Network [OSTI]

    Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

    2007-01-01T23:59:59.000Z

    cost of service differentials, maintenance of the extensive and lightly-loaded network, and overloaded substations

  12. Performance of Cotton Varieties in Texas, 1948-50.

    E-Print Network [OSTI]

    Killough, D. T. (David Thornton)

    1951-01-01T23:59:59.000Z

    in progress reports issued from time to time by the individual substations. Results of the outfield tests have been published by the respective county agents. REGIONS AND TEST LOCATIONS To form a general, though somewhat arbitrary, basis for systematizing... are designated by stars on the map. ~y region, they are: LOWER RIQ GRANDE V,L\\LLEY AND TRANS-PECOS Substation No. 15, Weslaco, (irrigated) Substation No. 9, Balmorhea, (irrigated) HIGH AND ROLLING PLAIN$ Substation No. 7, Spur, (dryland) Substation No. 8...

  13. A Case Study of a Commissioning Process for Demand Side Energy Conservation of the Large Heat Source Plant in Kyoto Station Building-APCBC

    E-Print Network [OSTI]

    Matsushita, N.; Yoshida,H.

    2014-01-01T23:59:59.000Z

    5 Heat source plant ?Total capacity?26.3MW? Substation ? ? ? Total : 6 Substations Bleed-in Control Substation ? ? ? The chilled water delivery system Large heat source plant similar to a DHC plant ? Total refrigerator capacity 26.3 MW ? Chilled... water is supplied 6 substations - Department store - Hotel - Theater - Train station etc. ? Bleed-in Control ? Commonly equipped in the substations of DHC plants. ? This control maintains the return water temperature to the plant by controlling...

  14. Bringing large-scale multiple genome analysis one step closer: ScalaBLAST and beyond

    E-Print Network [OSTI]

    Oehmen, Christopher S.

    2009-01-01T23:59:59.000Z

    Laboratory (PNNL), 902 Battelle Boulevard, P.O. Box 999,Laboratory (PNNL), 902 Battelle Boulevard, P.O. Box 999,laboratory operated by Battelle for the U.S. Department of

  15. The early planning and development of Oklahoma City

    E-Print Network [OSTI]

    Humphreys, Blair D. (Blair David)

    2009-01-01T23:59:59.000Z

    An analysis of the planning, development, and implementation of Oklahoma City's Grand Boulevard. In the early days of 1909, a plan emerged to build an expansive parks and boulevard system to encircle Oklahoma City. Such ...

  16. To whom correspondence should be addressed. (Tel) 82-42-860-4628; (Fax) 82-42-860-4677

    E-Print Network [OSTI]

    Bae, Jin-Woo

    described by Buck (Buck, 1982). Catalase activity was determined by observing bubble production in a 3% (v enzyme activity and substrate utilization from sole carbon sources. Chromosomal DNA was extracted

  17. Cullen College of Engineering Magazine Spring 2014

    E-Print Network [OSTI]

    Azevedo, Ricardo

    in Medicine I Fracking Definitions I Getting More Bang for Your Buck I In the Media 10 > Engineering News

  18. CX-002213: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    replacement along the Hanford-Wautoma 1 and 2 (substation to substation) transmission lines CX(s) Applied: B1.3 Date: 04232010 Location(s): Benton County, Washington...

  19. Categorical Exclusion (CX) Determination

    Broader source: Energy.gov (indexed) [DOE]

    as well as the installation of a revenue meter at a proposed new substation, South Heart substation, owned and operated by Upper Missouri. In order to bring the power into...

  20. EIS-0451: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    substations to a connection with Lower Valley Energy's (L VE's) existing 115-kV Lane Creek Substation, east of the City of Wayan, Idaho. The proposed project would address...

  1. Categorical Exclusions 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Rapid City Substation-Dry Creek Substation Transmission Line (1.02mb pdf) Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-170 (1.02mb pdf) Reconstruction...

  2. Technical Information Exchange on Pyrolysis Oil: Potential for...

    Office of Environmental Management (EM)

    Renewab;e Heating Oil Substation Fuel in New England Technical Information Exchange on Pyrolysis Oil: Potential for a Renewab;e Heating Oil Substation Fuel in New England This...

  3. Microsoft Word - Gardiner-Reedsport CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    Substation Install a new 115-kV breaker with revenue metering-quality current transformers (CTc) and one 1600A disconnect switch. Tahkenitch Substation BPA plans to replace...

  4. Dynamics of Methionine Ligand Rebinding in Cytochrome c Ping Zhang, Edyta Malolepsza, and John E. Straub*

    E-Print Network [OSTI]

    Straub, John E.

    . Straub* Department of Chemistry, Boston University, Boston, Massachusetts 02215, United States ABSTRACT states during the process of ligand dissociation and recombination. Multiple conformational substates for interconversion between substates lead to a mechanism elucidating the fast and slow rebinding time scales

  5. "Strange Kinetics" in the Temperature Dependence of Methionine Ligand Rebinding Dynamics in Cytochrome c

    E-Print Network [OSTI]

    Straub, John E.

    , Boston, Massachusetts 02215, United States ABSTRACT: The temperature dependence of methionine ligand) rebinding is observed. While fast rebinding occurs from a "downward" (heme pointing) substate of the methionine, the slow rebinding involves interconversion between an "upward" substate, from which rebinding

  6. Abstract--A measurement calibration method is described in this paper. The proposed method identifies calibration models

    E-Print Network [OSTI]

    in state estima- tion. Measurement calibration at the substation is a labor intensive and costly process that is described in [2]-[3] is executed at individual substations by taking advantage of the redundancy provided

  7. Crypto Corner Editors: Peter Gutmann, pgut001@cs.auckland.ac.nz

    E-Print Network [OSTI]

    Smith, Sean W.

    't wait seconds for the communication to fin- ish. We need to think about the latency cost of any a substation to open or close lines incorrectly, or impersonating a substation and lying to the con- trol

  8. DistFlow ODE: Modeling, analyzing and controlling long distribution feeder

    E-Print Network [OSTI]

    Wang, Danhua

    We consider a linear feeder connecting multiple distributed loads and generators to the sub-station. Voltage is controlled directly at the sub-station, however, voltage down the line shifts up or down, in particular depending ...

  9. Level 1 Accident Report of the March 1, 2010 Bobcat Fatality...

    Broader source: Energy.gov (indexed) [DOE]

    Report of the March 1, 2010 Bobcat Fatality at BPA's White Bluffs Substation Level 1 Accident Report of the March 1, 2010 Bobcat Fatality at BPA's White Bluffs Substation March 31,...

  10. International Microgrid Assessment: Governance, INcentives, and Experience (IMAGINE)

    E-Print Network [OSTI]

    Marnay, Chris

    2014-01-01T23:59:59.000Z

    Cyber-security of electric grid (virtual secure enclave) Smart grid technologies & applications (advanced metering infrastructure, substation and distribution

  11. PROGRAMMATIC AGREEMENT AMONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electrical transmission systems that includes transmission Jines, substations, communication sites, maintenance facilities, and ancillary features; and WHEREAS, Westem...

  12. Categorical Exclusions 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Routine Activities (1.45mb pdf) Gwinner Communication Site Construction (643kb pdf) Edgeley Substation (16...

  13. Performance of Cotton Varieties in Texas, 1954- 1956.

    E-Print Network [OSTI]

    Elliott, J.C.; Richmond, J. R.; Niles, G. A.

    1957-01-01T23:59:59.000Z

    on page 4. The three regions and the test locations within them are as follows : REGION 1 LOWER RIO GRANDE VALLEY, WINTER GARDEN AND TRANS-PECOS Substation No. 15, Weslaco, (irrigated) Rangerville, Hidalgo county (irrigated) Batesville, Zavala... county (irrigated) Carrizo Springs, Dimmit county (irrigated) Substation No. 9, Balmorhea (irrigated) Pecos, Reeves county (irrigated) Substation No. 17, Ysleta (irrigated) REGION 2 HIGH AND ROLLING PLAINS Substation No. 16, Iowa Park (irrigated...

  14. The Heating of Corn Chops.

    E-Print Network [OSTI]

    Fraps, G. S.

    1912-01-01T23:59:59.000Z

    OF SUB-STATIONS. E. E. B in fobd , Beeville Sub-Station......... ................................... Beeville, Bee County W, S. H o tc h k is s , Troup Sub-Station........................................ Troup, Smith County E. M. J oh n s to n... , Cooperative Rice Station................Beaumont, Jefferson County I. S. Y o rk , Spur Sub-Station.......................................................... Spur, Dickens County T. W . B u e l l , Denton, Sub...

  15. Performance of Cotton Varieties in Texas, 1951-53.

    E-Print Network [OSTI]

    Elliott, Fred C. (Fred Craig); Richmond, Thomas R.; Killough, D. T. (David Thornton)

    1954-01-01T23:59:59.000Z

    are published in progress re- ports issued from time to time by the individual substations, and may be obtained from them or from the Agricultural Information Office at Col- lege Station, Texas. Results of the outfield tests have been published... on the front cover. By region, they are : CLIMATIC CONDITIONS AND SOIL TYPES 0: LOWER RIO GRANDE VALLEY AND TRANS-PECOS Substation No. 15, Weslaco, (Irrigated) Substation No. 19, Winter Haven, (Irrigated) Substation No. 9, Balmorhea, (Irrigated...

  16. Sheep Breeding and Feeding.

    E-Print Network [OSTI]

    Jones, J. M. (John McKinley)

    1917-01-01T23:59:59.000Z

    L. J. HART, Chairman WILL A. MILLER, JR. GOVERNING BOARD, STATE SUBSTATIONS ....................................... P L DOWNS President Temple.. .Term expires 1919 ................................. c~ARLE~ ROAAN. vice-hrerid~nf. Austin. .Term..., Inspector T. H. WOLTERS. Inspecfor S. D. PEARCE, Inspector W. M. WICKES, Inspector SUBSTATION NO. 1: Beeville, Bee Count] E. E. BINFORD, B. S., Super~ntendenf SUBSTATION'NO. 2: Troup, Smith Count: W. S. HOTCHKISS, Superintendent SUBSTATION NO. 3...

  17. EA-0587: Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of Northern States Power Company's  proposal to expand the Forbes Substation in Minnesota.

  18. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Externals, ATC Paths, Interties) Substations AFCATC Inventory Components Load Forecast Information applicable to Long Term Market Generators applicable to...

  19. The Building Adaptive Re-Use

    E-Print Network [OSTI]

    Flynn, E. Victor

    quality internal finishes without historic significance · Existing substation at basement level requiring in addressing these issues of cost an

  20. EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California

    Broader source: Energy.gov [DOE]

    Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

  1. C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ostrander Castle Rock Baxter Road Substation Site Casey Road Substation Site Monahan Creek Substation Site S i l v e r L a k e Co w l i t z T o u t l e C o l u m b i a R i v e r...

  2. Hindawi Publishing Corporation International Journal of Distributed Sensor Networks

    E-Print Network [OSTI]

    Wang, Wenye

    in the Smart Grid: An Empirical Study in Substation Automation Systems Xiang Lu,1, 2 Wenye Wang,2 and Jianfeng. As one of the most important facilities of power infrastructures, electrical substations undertake at authentication and integrity protections in substation automation systems (SAS), by an experimental approach

  3. To appear in Proceedings Turing90 Colloquium Edited by Peter Millican, Published by OUP

    E-Print Network [OSTI]

    Sloman, Aaron

    , causally interacting sub-states that have different causal roles, including both `belief-like' and `desire-like' sub-states, and many others. There are many significantly different such architectures. For certain architectures (including simple computers), some sub-states have a semantic interpretation for the system

  4. OccK Channels from Pseudomonas aeruginosa Exhibit Diverse Single-Channel Electrical Signatures but Conserved Anion Selectivity

    E-Print Network [OSTI]

    Movileanu, Liviu

    of Massachusetts Medical School, Worcester, Massachusetts 01605, United States § Structural Biology, Biochemistry single-channel dynamics of current gating transitions, revealing one-open substate (OccK3), two-open substate (OccK4- OccK6), and three-open substate (OccK1, OccK2, and OccK7) kinetics with functionally

  5. Wind Power Systems 1. Overview

    E-Print Network [OSTI]

    Ding, Yu

    or non-renewable 3 #12;Electricity basics1 Step-up transmission substation(155-765kV) · Step-down transmission substation (69 kV) · Distribution substations (19.9-24kV) Generation Transmission Distribution 4 1, Connecticut, Delaware, District of Columbia, Illinois, Maine, Maryland, Massachusetts, Michigan, Montana

  6. Physical Plant Utility Department

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    of Massachusetts Amherst Electrical Distribution & Outdoor Lighting 3.0 Table of Contents Page 1 UMass Medium buses at the Eastside sub-station. The Eastside sub-station is comprised of two separate buses with a normally open bus tie. Each bus is automatically backed up by separate utility feeds. The Eastside Sub-station

  7. Constraint-based Evolutionary QoS Adaptation for Power Utility Communication Networks

    E-Print Network [OSTI]

    Suzuki, Jun

    Champrasert, Junichi Suzuki and Tetsuo Otani Department of Computer Science University of Massachusetts power stations to consumers through a number of substations. Recently, the commu- nication networks consumers through a chain of substations. Each substation is re- sponsible for a certain physical regio

  8. Real time detection and correction of distribution feeder operational problems

    SciTech Connect (OSTI)

    Subramanian, A.K.; Huang, J.C.

    1995-12-31T23:59:59.000Z

    The paper presents a new technique that detects and corrects distribution operational problems using closed loop control of substation transformers, capacitors and reactors by an online computer. This allows the distribution system to be operated close to its capacity without sacrificing the quality of power supply. Such operations help defer the additional cost of installing new substations. The technique integrates the Distribution Feeder Analysis (DFA) and the Distribution Substation Control (DSC) functions to achieve this. The DFA function provides the topology and power flow results for the feeders using the substation real time measurements. It does not require feeder section measurements. The realtime feeder results are used in detecting any currently existing feeder operational problems such as feeder section voltages and currents outside their limits. The detected feeder problems are transformed into substation distribution bus objectives and then corrected by the DSC function using controls available at the substation. The DSC function has been performing successfully for several years at Potomac Electric Power Company (PEPCO) in Washington, D.C. It uses a closed loop control scheme that controls the substation transformer taps and shunt capacitor and reactor breakers and optimizes the substation operation. By combining the DFA and DSC functions into a single function and with proper transformation of feeder problems into substation objectives, a new closed loop control scheme for the substation controls is achieved. This scheme corrects the detected feeder problems and optimizes the substation operation. This technique is implemented and tested using the actual substation and feeder models of PEPCO.

  9. COUR D'APPEL DE DIJONCOUR D'APPEL DE DIJON Premire Prsidence

    E-Print Network [OSTI]

    Herrmann, Samuel

    .02.03 - ARMENIEN T.G.I de DIJON 2005-2010 DUPONT née VARDANYAN Manon - (1974) 10 boulevard Rembrandt - 21000 DIJON

  10. almeja asaphis defl: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of 1, . . . , n Miller, Dale 5 Section of Fishes. Natural History Museum of Los Angeles County 900 Exposition Boulevard. Los Angeles. California 90007 Environmental Sciences and...

  11. Joint Center for Artificial Photosynthesis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JCAP North JCAP Headquarters Joint Center for Artificial Photosynthesis California Institute of Technology Jorgensen Laboratory, Mail Code 132-80 1200 East California Boulevard...

  12. Shipping and Receiving | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    radiological material to RadEMSL (EMSL's Radiochemistry Annex). Fed Ex, Airborne, or UPS Pacific Northwest National Laboratory EMSL Shipping Attn: 3335 Innovation Boulevard...

  13. Data:B392cd0d-6ada-4b87-b87d-58b413afe8de | Open Energy Information

    Open Energy Info (EERE)

    wood poles and supplied from overhead circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking...

  14. Les ombres noires de Saint Domingue: The Impact of Black Women on Gender and Racial Boundaries in Eighteenth- and Nineteenth-Century France

    E-Print Network [OSTI]

    Mitchell, Robin

    2010-01-01T23:59:59.000Z

    Autrement mêmes. Paris: Harmattan, 2003. Clausson, L. J.1550- 1960). Paris: Harmattan, 1998. Chase-Riboud, Barbara.du Boulevard (Paris : L’Harmattan, 2003), xiii. See also

  15. U.S. DEPAR TMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the protocols in place for laboratory safety, risk management, chemical handling and waste disposal. SolarBridge is located at 9229 Waterford Centre Boulevard 110, Austin....

  16. Soft-Switching High-Frequency AC-Link Universal Power Converters with Galvanic Isolation

    E-Print Network [OSTI]

    Amirabadi, Mahshid

    2013-08-07T23:59:59.000Z

    ) direct drive using wound-field synchronous generator [10]. ...................................................................................................... 6 Figure 6 Dc-dc buck-boost converter: (a) configuration, (b) energizing mode (mode 1), (c...) de-energizing mode (mode 2), (d) voltage and current waveforms ........ 12 Figure 7 An alternative representation of the dc-dc buck-boost converter ...................... 13 Figure 8 Dc-dc ac-link buck-boost converter: configuration, behavior...

  17. Breakout Session: Future of CSP: Challenges and Opportunities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Senior Vice President of Marketing and Government Affairs, BrightSource Energy Kevin Smith Chief Executive Officer, SolarReserve Buck Martinez Senior Director Project...

  18. Microsoft Word - WBA-12-0001.docx

    Broader source: Energy.gov (indexed) [DOE]

    in her Response, illustrates this: she states her belief that Mr. Buck was apparently logging hours for time not worked." Id. The Investigator concluded that this disclosure...

  19. Copper Toxicity in the San Francisco Bay-Delta

    E-Print Network [OSTI]

    Buck, Kristen N.

    2012-01-01T23:59:59.000Z

    A. R. Flegal, and K. W. Bruland. 2007. A review of totalBuck, K. N. , and K. W. Bruland. 2005. Copper speciation in

  20. Employment Services Utilization and Outcomes among Substance Abusing Offenders Participating in California’s Proposition 36 Drug Treatment Initiative

    E-Print Network [OSTI]

    Evans, Elizabeth; Hser, Yih-Ing; Huang, David

    2010-01-01T23:59:59.000Z

    2005. 2. Buck ML. Employment programs for ex-offenders.between adolescent employment and antisocial behavior: AMB. Ex-offender employment programs and recidivism: A meta-

  1. averaging current-mode rectifiers: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a High Efficiency Three-Phase Buck Rectifier Engineering Websites Summary: -voltage DC (HVDC) distribution architecture in telecom and data centers was shown to have superior...

  2. activating delayed rectifier: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a High Efficiency Three-Phase Buck Rectifier Engineering Websites Summary: -voltage DC (HVDC) distribution architecture in telecom and data centers was shown to have superior...

  3. Between the Low Road and the High Road: Logics of Valorization and Regimes of Lean Production in US Manufacturing

    E-Print Network [OSTI]

    Vidal, Matt

    2012-01-01T23:59:59.000Z

    continuous improvement (kaizen), and teamwork. 2 [TABLE 2often known by the Japanese kaizen. As the plant manager ofbang for the buck for the kaizen activities. ” Together, the

  4. Another Map, another History, another Modernity

    E-Print Network [OSTI]

    Chambers, Iain Michael

    2010-01-01T23:59:59.000Z

    Buck-Morss, Susan. Hegel, Haiti, and Universal History.Modernity Disavowed. Haiti and the Cultures of Slavery inbetween Hegel and Haiti, between European idealist

  5. National Myths, Resistant Persons: Ethnographic Fictions of Haiti

    E-Print Network [OSTI]

    Farooq, Nihad M.

    2013-01-01T23:59:59.000Z

    Buck-Morss, Susan. Hegel, Haiti, and Universal History.Chin, Pat, et al. , eds. Haiti: A Slave Revolution: 200E. “Modernist (Pre)Occupations: Haiti, Primitivism, and

  6. Technical Report NREL/TP-7A2-47956

    E-Print Network [OSTI]

    the amount of annual solar energy that can be pro- duced from PV for the designated area populated with PV-Penetration PV Potential Chris Helm and Kari Burman #12;National Renewable Energy Laboratory 1617 Cole Boulevard.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance

  7. UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD

    E-Print Network [OSTI]

    JEC187V3 UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 of Energy 1000 Independence Avenue, SW Washington, DC 20585 Dear Secretary O'Leary: At the Nuclear Waste UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Arlington, VA

  8. Green Power Marketing in the United States: A Status Report

    E-Print Network [OSTI]

    80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest-28738 Blair Swezey and Lori Bird National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado

  9. Green Power Marketing in the United States: A Status Report

    E-Print Network [OSTI]

    , Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest/TP-620-35119 Lori Bird and Blair Swezey National Renewable Energy Laboratory 1617 Cole Boulevard Golden

  10. Food habits of the South American sea lion, Otaria flavescens, off Patagonia, Argentina

    E-Print Network [OSTI]

    250 Food habits of the South American sea lion, Otaria flavescens, off Patagonia, Argentina Mariano Nacional de la Patagonia Boulevard Brown 3600 (9120) Puerto Madryn, Chubut, Argentina E-mail address: koen Patagonia Boulevard Brown 3600 (9120) Puerto Madryn, Chubut, Argentina Manuscript accepted 9 August 1999

  11. July 1998 NREL/TP-550-24004 Public Response to Residential

    E-Print Network [OSTI]

    Cole Boulevard Golden, Colorado 80401-3393 A national laboratory of the U.S. Department of Energy Cole Boulevard Golden, Colorado 80401-3393 A national laboratory of the U.S. Department of Energy, Kay Vernon, and David Crawford provided graphics, word processing, and editorial support. Finally

  12. Energy Metering for Free: Augmenting Switching Regulators for Real-Time Monitoring

    E-Print Network [OSTI]

    Count, a new energy meter design. For many systems that have a built-in switching regulator, adding a single nearly linearly with load current for a variety of regulators. 1 The iCount Design Many battery a variety of regulator topologies (boost, buck, buck-boost), control modes (current-mode, voltage

  13. Resilient Core Networks for Energy Distribution

    SciTech Connect (OSTI)

    Kuntze, Nicolai; Rudolph, Carsten; Leivesley, Sally; Manz, David O.; Endicott-Popovsky, Barbara E.

    2014-07-28T23:59:59.000Z

    Abstract—Substations and their control are crucial for the availability of electricity in today’s energy distribution. Ad- vanced energy grids with Distributed Energy Resources require higher complexity in substations, distributed functionality and communication between devices inside substations and between substations. Also, substations include more and more intelligent devices and ICT based systems. All these devices are connected to other systems by different types of communication links or are situated in uncontrolled environments. Therefore, the risk of ICT based attacks on energy grids is growing. Consequently, security measures to counter these risks need to be an intrinsic part of energy grids. This paper introduces the concept of a Resilient Core Network to interconnected substations. This core network provides essen- tial security features, enables fast detection of attacks and allows for a distributed and autonomous mitigation of ICT based risks.

  14. Poultry Feeds and Feeding Results.

    E-Print Network [OSTI]

    Harvey, R.N.

    1917-01-01T23:59:59.000Z

    . MILLER, JR. GOVERNING BOARD, STATE SUBSTATIONS P L DOWNS President Temple.. ....................................... .Term expires 1919. .............................................. \\+ P HOBB; ~eaumoAt. .Term expires 1917...., Assisfanf W. M. WICKES, Zrjspecfor Chemrst SUBSTATION NO: 1: Beeville, Bee County DIVISION OF HORTICULTURE E. E. BINFORD, B. S., Superinfendent H Y~ss M '5 H~~fi~lllfl~ri~f in Charge SUBSTATION NO. 2: Troy,,, Smith County rculfurisf \\.y: S. 'Hdtchicis...

  15. Wastewater Reclamation/Wetlands

    E-Print Network [OSTI]

    Hickey, D.

    2011-01-01T23:59:59.000Z

    Wetland easement (2000 acres) 3.7 miles 1.4 miles Direction of flow NORTH FM 3039 US 175 Five Major Components ? Diversion Pump Station & Diversion Structure ? Constructed Wetland ? Conveyance Pump Station ? Electrical Substation... ? Vertical Turbine Pumps 3 ? 3000 Hp 2 ? future 6000 Hp ? Equipped with SCADA system Electrical Substation Electrical Substation ? Provides power to the Conveyance Pump Station ? Power is approximately 60% of annual operating budget ? Power...

  16. Poultry Houses and Poultry Equipment for Texas.

    E-Print Network [OSTI]

    Harvey, R. N.; Olsen, J.C.; Kazmeier, F.W.; Conway, T.J.

    1917-01-01T23:59:59.000Z

    . ............................................... .Term expires 192 MAIN STATION COMMITTEE L. J. HART, Chairman WILL A. MILLER, JR. GOVERNING BOARD. STATE SUBSTATIONS P L DOWNS President Temple. ........................................ .Term expires 191 C'AARLEY ROGAN. vice-brerident. Austin...' T. H .' WOL,T;RS Inspedor S. D. PEARCE, inspector W. M. ~VICKES, Inspector Chemlst SUBSTATION NO. 1: Beeville, Bee Count DIVISION OF HORTICULTURE E. E. BINFORD. B. S., Superintendent H. NESS, M. :$.. H~rtirulturi~t in Charge SUBSTATION NO. 2...

  17. Sudan Grass.

    E-Print Network [OSTI]

    Youngblood, B.; Conner, A. B.

    1915-01-01T23:59:59.000Z

    .. .. .......... . . .. ............ .. ........ .. .. .... ....................... .. .. .. .... Term expires 1915 GOVERNING BOARD, STATE SUBSTATIONS P. L . DowNs, President, Temple .. ....... : .. .. .. .. CHARLES RoGAN, Vice-President, Austm .. .. .. W. A. TYNES, Cooper .... .... .. . W. P . HOBBY, Beaumont.. ...... . .Term expires 1919..., Feed Inspector S. D. PEARCE, Feed Inspector J . M. ScHAEDEL, Feed Inspector JAMES SuLLIVAN, Feed Inspector \\V. M. W ICKES, Feed Inspector SUBSTATION NO. 1: Beeville, Bee County E. E. BINFORD, B. S., Superintendent SUBSTATION NO. 2: Troup, Smith...

  18. Cocoanut Meal vs. Cottonseed Meal for Dairy Cows.

    E-Print Network [OSTI]

    Ewing, P. V. (Perry Van); Spence, E.R.

    1918-01-01T23:59:59.000Z

    ....................................................................................................... F. M. LAW. Houston Term expires 1923 MAIN STATION COMMITTEE L. J. HART. Chairman WIU A. MILLER. JR. GOVERNING BOARD, STATE SUBSTATIONS P L DOWNS. Tern le, President....,.Anlmal Husbandman, W. I. HAMPSTON, Inspector Feeding Investr atlons SUBSTATION NO. 1: Beeville. Bee County J. M. JONES. A. 6.. Animal Husbandman, I. E. COWART. M. S.. Superintendent Breeding Inuuir atrons P. p. EWING, f., Animal Husbandman SUBSTATION NO. 2: T...

  19. Justifying and Planning an Energy Monitoring System in an Existing Plant

    E-Print Network [OSTI]

    Stublen, A. P.; Wellman, C. M.; Kell, S. A.

    benefits are needed on all sites. For example, harmonic monitoring is only needed on substations with tuned filters. Disturbance monitoring is only needed on purchased power substations and on large adjustable speed-drive applications where power dip... availability. Under permanent investment, include the cost of potential new substations and medium voltage feeders; count potential energy savings from interruptible load and peak shaving under variable cost. Conceptual Design and Estimating. When a...

  20. The Composition of Peanuts and Peanut By-Products.

    E-Print Network [OSTI]

    Fraps, G. S. (George Stronach)

    1917-01-01T23:59:59.000Z

    ............................................................................................... Hi A. BREIHAN, Bartlett Term expjres 1923 .......................... F. M. LAW, Houston exp~res 1923 MAIN STATION COMMITTEE L. J. HAR;~, Chairman WILL A. MILLER, JR. .GOVERNING BOARD, STATE SUBSTATIONS.... FULLER, M. S., Chief JAMES SULLIVAN. Executtrfe Secretary J. H. ROGERS. Tnspertnr W. H. WOOD. Tns~ector W. M. WICKAS, Inspertor W. F. CHRISTIAN, Inspecfor SUBSTATION NO. 1: Becville, Ree'Couniy I. E. COWART. M. S.. Superinfcndent SUBSTATION NO. 2...

  1. The Availability of Phosphoric Acid in Rock Phosphate.

    E-Print Network [OSTI]

    Fraps, G. S. (George Stronach)

    1917-01-01T23:59:59.000Z

    .'MILLER, JR, GOVERNING BOARD, STATE SUBSTATIONS p L DOWNS President, Temple. ........................................ .Termvexpires'lg19 ck~k~es ROAAN. Vice-Pregrdrnt. Austin. ................................. .Term:expires 1923 W p IIOBBY Beaumont... SUBSTATION NO. 1: Beeville, Bee Connty DIVISION OF HORTICULTURE E. BINFORD, B. S., Superintendent - H. NESS, M. s.. Horti~ult~rrisf in Charge W. S. Hotchkiss. ~Iortrculturrst SUBSTATION NO. 2: Tropp, Smith County W. S. HOTCHKISS, Superrntendent...

  2. Commercial Feeding Stuffs, 1914-15: Texas Feed Law.

    E-Print Network [OSTI]

    Youngblood, B. (Bonney)

    1915-01-01T23:59:59.000Z

    .......................................................................................... J. 'E. 'B~o~-s&TT, Coleman Term expires 1921 I *STATION STAFF ADMINISTRATION DIVISION OF FEED CONTROL SERVICE I3 YOUNGBLOOD M S Director JAMES SULLI\\ AN Execufiue Secretary A' B CONNER 6 S' $ice Director CHAS. A. FELKE~, Chief Clerk &AS. A.... HOTCHKISS, Superlntendenl SUBSTATION NO. 3: Angleton, Brazoria County N. E. ~VINTERS, B. S., Superintendenl SUBSTATION NO. 4: Beaumont, Jefferson County H. H. LAUDE, B. S., Superiniendent SUBSTATION NO. 5: Temple, Bell County A. K. SHORT, B. S...

  3. Baseline Report for the Fort Hood Army Base: September 2003 to October 2004

    E-Print Network [OSTI]

    Haberl, J. S.; Liu, Z.

    2007-09-21T23:59:59.000Z

    December 2004 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University System Ft. Hood Baseline Report, p. 1 December 2004 Energy Systems Laboratory, Texas A&M University PREFACE This report... building was also initiated in November of 2001 and completed in 2002. The data from Central Thermal Power Plant (87000), III Corp building, Darnall Hospital 1 , Main Substation, West Substation, and North Substation are plotted and reported...

  4. VT Electric Services VTES 601 Energy Dr.

    E-Print Network [OSTI]

    Buehrer, R. Michael

    units on campus · Designs, operates, and maintains 3 substations Virginia Tech Electric Services Electric Services is to provide adequate, reliable and economical electric service to the buildings

  5. Microsoft Word - BPA I-5 Corridor Reinforcement_Scoping Meeting...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and through Oregon to reach a proposed substation in Troutdale. Transmission tower design: Some suggested that any additional towers placed in an existing ROW be aligned with...

  6. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medicine Bow Substation Control Building Installation Project (Amended) Carbon County, Wyoming A. Brief Description of Proposal: Western Area Power Administration (Western)...

  7. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lovell, Basin, and Buffalo Bill Substations, Control Building Rehabilitation P1ojects Big Horn and Park Counties, Wyoming A. Brief Description of Proposal: Western Area Power...

  8. ENVIRONMENTAL REVIEW FOR CATEGOIUCAL EXCLUSION DETERMINATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CATEGOIUCAL EXCLUSION DETERMINATION Rocky Mountain Region, Western Area Power Administration Ogallala Substation Drainage Control Keith County, Nebraska A. Brief Description of...

  9. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Shiprock Substation Stormwater Erosion Control Maintenance San Juan County, New Mexico A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to...

  10. Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project, Mile 6 to Oracle Substation Categorical Exclusion Continuation Sheet Project Description Maintenance work at...

  11. Electrician- Craftsman In Training- CIT

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, North Dakota Maintenance Office, Fargo Substation...

  12. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    augment an existing distribution grid simulator and substation, distribution & data automation platforms to produce the required operational functions of a microgrid control...

  13. CX-008691: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  14. Case Study-Talquin Electric Cooperative

    Broader source: Energy.gov (indexed) [DOE]

    substation during a winter peak event and saved 12,000 in demand charges from their wholesale electricity provider. Mr. Eugene Kanikovsky, Director of Finance, believes it is...

  15. CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF...

    Broader source: Energy.gov (indexed) [DOE]

    Humphrey Oklahoma- Broken Bow Project Office, Broken Bow Powerhouse, Gore Substation, Lamar, Weleetka, Henryetta, Bald Hill, Red Fork, Moody's, Fort Gibson, Gore Radio, and Short...

  16. FINAL Submitted to NREL

    Office of Environmental Management (EM)

    a series of upgrades: (1) installing supervisory control and data acquisition (SCADA) systems in all substations which provide greater information for system operators, (2)...

  17. aftertreatment subsystem development: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AREVA T&D's aluminium electrolysis conversion substations: Environmental evaluation; Life cycle assessment; Complex system; Subsystem; Aluminium electrolysis conversion Paris-Sud...

  18. THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...

  19. CX-011535: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    East Grangeville Substation Sale CX(s) Applied: B1.24 Date: 11/14/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

  20. CX-012233: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Shed Acquisition at Kalispell Substation CX(s) Applied: B1.24 Date: 06/09/2014 Location(s): Montana Offices(s): Bonneville Power Administration

  1. Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eastern and Western Interconnections separated by the Miles City DC tie and the Fort Peck Power Plant substation. Western-UGP also currently operates two Balancing Authority Areas...

  2. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    temporary installation of a Shoo-fly within the substation yard in preparation of a transformer replacement project. The work includes having tensioning and pulling equipment on...

  3. Microsoft Word - CX -Marion to Santiam Fiber.doc

    Broader source: Energy.gov (indexed) [DOE]

    in Marion County, Oregon to BPA's Santiam Substation in Linn County, Oregon. The fiber optics along this route would provide additional support of BPA's internal operational needs...

  4. CX-011239: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Security Upgrades at Multiple Substations CX(s) Applied: ? Date: 10/02/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

  5. CX-010338: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eugene Substation Fiber Interconnection CX(s) Applied: B4.7 Date: 05/21/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  6. CX-011531: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Targhee Substation Land Acquisition CX(s) Applied: B1.24 Date: 11/05/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

  7. CX-010435: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  8. acute leukaemia undergoing: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for residential exposure to power frequency magnetic fields from power-lines and transformer substations was assessed indirectly from the distance, type and loading of the...

  9. access control system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  10. access ofdma systems: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  11. analysing access control: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  12. access appointment system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  13. automated radiological monitoring: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the control applications. The data interfacing between the substation IEDs and EMS SCADA database to allow for such integration is elaborated on indicating various issues in...

  14. access denial systems: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  15. access mri system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  16. access system lacs: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  17. access control systems: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  18. access system analysis: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Management Systems (EPMS) and Supervisory Control and Data Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation...

  19. CX-012195: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  20. [1] C. Alcaraz and J. Lopez. WASAM: a dynamic wide-area situational awareness model for critical domains in smart grids. Future Generation Computer Systems, 30:146-154, Jan. 2014.

    E-Print Network [OSTI]

    Briesemeister, Linda

    activity in remote substations at all times. Keywords: Detection; Energy Control Systems; Industrial sufficient against attacks. IDS are currently independent and coexisting solutions. Each single IDS requires

  1. CX-010057: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  2. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards andor...

  3. CX-007355: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    retire the associated metering equipment); remove BPA meters, rack, and instrument transformers at PGE's Canby Substation; and replace the existing BPA meter at Canby Utility...

  4. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CEN T ER

    Broader source: Energy.gov (indexed) [DOE]

    valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards andor...

  5. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards andor...

  6. RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document...

    Broader source: Energy.gov (indexed) [DOE]

    valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards andor...

  7. RI-:ClPIl<:NT:King County U.S. DEPARTlIIENT OF ENERGY EERE PROJECT...

    Broader source: Energy.gov (indexed) [DOE]

    valves, in-core monitoring devices, facility air filtration systems, Of" substation transformers or capacitors; addition of structural bracing to meet earthquake standards andOf"...

  8. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: Energy.gov (indexed) [DOE]

    changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. B4.11 Electric power substations and interconnection facilities...

  9. u.s. DEPARTlIlENT OF ENERGY EERE PROJECT M ANAGE MENT CEN T

    Broader source: Energy.gov (indexed) [DOE]

    valves, in-core monitoring devices. facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards andor...

  10. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: Energy.gov (indexed) [DOE]

    changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. B4.11 Electric power substations and interconnection facilities....

  11. Bill, Eisele, Energy Reliability in a Changing Landscape

    Broader source: Energy.gov (indexed) [DOE]

    load Transmission and distribution poles and wires, substation and distribution transformers, etc Usually described as being owned and operated by a utility or...

  12. Microsoft PowerPoint - Cost-Allocation Customer Presentation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for TSO SCADA points Number of substations Number of circuit breakers Number of transformers Number of switching orders Percent time spent on each...

  13. access design considerations: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for a Large-Scale Wireless Sensor Network for Substation Monitoring Asis such as transformers, circuit break- ers, and compressors. All nodes communicate over a multihop...

  14. EIS-0483: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    3: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0483: EPA Notice of Availability of Draft Environmental Impact Statement Estes to Flatiron Substation...

  15. EIS-0400: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission...

  16. EIS-0400: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Draft Environmental Impact Statement EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard Windy Gap Substation...

  17. EIS-0374: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Day 500-kV Substation. DOEEIS-0374, Environmental Protection Agency, Notice of Availability of the Department of Energy, Bonneville Power Administration, Draft Environmental...

  18. Approaches To Integrating A HIgh Penertration Of Solar PV and CPV Onto The Electrical Grid

    E-Print Network [OSTI]

    Hill, Steven Craig

    2013-01-01T23:59:59.000Z

    Electric Coordinating Council (WECC), the National RenewableSubstations Recommendations For WECC Transmission Expansioncoordinated with the CAISO and WECC. OTHER The target budget

  19. STATEMENT OF CONSIDERATIONS

    Broader source: Energy.gov (indexed) [DOE]

    industry. It develops integrating technologies for substation and distribution automation, real-time power control, information management and energy market systems. Alstom's...

  20. Treatment Effect of Repairs to an Electrical Grid Leveraging a Machine Learned Model of Structure Vulnerability

    E-Print Network [OSTI]

    Rudin, Cynthia

    , USA becky@cs.columbia.edu Cynthia Rudin MIT Sloan School of Management Massachusetts Institute substations, where transformers step the voltage d

  1. Dynamics of Confident Voting D. Volovik1

    E-Print Network [OSTI]

    Redner, Sidney

    of Physics, Boston University, Boston, Massachusetts 02215, USA Abstract. We introduce the confident voter two substates that correspond to different confidence levels in the opinion. The basic variables

  2. Fast Detection and Recovery from Communication Link Failures in a Smart Grid using OpenFlow

    E-Print Network [OSTI]

    Kurose, Jim

    Gyllstrom, Nicholas Braga, and Jim Kurose School of Computer Science. University of Massachusetts Amherst ­ electric substations, power generation centers, or aggregation points of electrical loads

  3. Comments of Lawrence J. Reilly Chairman, Vermont Electric Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    system that includes: 738 miles of transmission lines; 13,000 acres of rights- of-way; 55 substations, switching stations, and terminal facilities; equipment that enables...

  4. SmartCharge: Cutting the Electricity Bill in Smart Homes with Energy Storage

    E-Print Network [OSTI]

    Shenoy, Prashant

    Irwin, Prashant Shenoy, and Jim Kurose University of Massachusetts Amherst {adityam, transmission lines, and substations--and op- erational expenses, since "peaking" generators are generally

  5. Emergency reconfiguration and distribution system planning under the Single-Contingency Policy

    E-Print Network [OSTI]

    Wang, J.

    Emergency reconfiguration can improve distribution systems' reliability by enabling load transfer among substations. Previous studies, although present its operation strategies, seldom explore emergency reconfiguration's ...

  6. Data:70e9086c-f978-4144-b187-69d7b1118f09 | Open Energy Information

    Open Energy Info (EERE)

    served, and additional investment by the Company for new transmission, substation or terminal facilities is not necessary to supply the desired service. APPLICABILITY Service...

  7. Data:Ea39d291-82b2-4a9a-af51-8899dc352ea1 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  8. Data:Dad8e1ae-72f1-4f19-b064-fba8f8195074 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  9. Data:892a8a6c-6d45-4d60-a6c2-4eb2d7ab908a | Open Energy Information

    Open Energy Info (EERE)

    served and additional investment by the Company for new transmission, substation, or terminal facilities is not necessary to supply the desired service. APPLICABILITY Service...

  10. Data:6f53de29-05ab-45c7-9814-ffd9647265f3 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  11. Data:B3ff8157-8ca5-4576-b190-7ec6b2c66510 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  12. Data:B7c8484c-8573-4ed3-8a88-eb8c9947aedf | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  13. Data:7d240cf1-41c1-4bae-9b1a-568b2e974254 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  14. Data:8ad3956a-2f16-4528-83ed-30d4ae5860dd | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  15. Data:C7f8e52a-d600-415e-8522-2e664ed0f7fd | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  16. Data:511e4e03-32d2-43b0-8da7-dde467d0f938 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  17. Data:F0a4fdae-8962-402e-8899-e9d010b558c8 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  18. Data:Fd54457f-4ba7-4fc3-938f-0196a7f34c13 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  19. Data:9bf6f85a-7f31-41b4-b570-ca5663766168 | Open Energy Information

    Open Energy Info (EERE)

    served and additional investment by the Company for new transmission, substation, or terminal facilities is not necessary to supply the desired service. APPLICABILITY Service...

  20. Data:Ffcc6cdc-4698-4355-b033-499c2717fa52 | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  1. Data:F22167b5-5ba0-4578-a004-a597a46da80c | Open Energy Information

    Open Energy Info (EERE)

    and additional investment by the Cooperative for new transmission, substation or terminal facilities is not necessary to supply the desired service. Service is subject to...

  2. Energy Blog | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    conservation and sustainability manager, cited as a reason the city is forging ahead with energy retrofits and solar projects. July 19, 2010 North Community Police Substation...

  3. Data:81913c11-d1e4-4fcb-b360-3b25cfa5cf19 | Open Energy Information

    Open Energy Info (EERE)

    service at transmission, substation and primary level service for qualifying cogeneration facilities. Facilities Charge, per kW of facilities demand: 5.50 Wholesale Demand...

  4. Data:94eed7a8-c03d-446c-ab38-09909e8e3de5 | Open Energy Information

    Open Energy Info (EERE)

    service at transmission, substation and primary level service for qualifying cogeneration facilities. Facilities Charge, per kW of facilities demand: 1.75 Wholesale Demand...

  5. Data:Ec257711-1250-4521-b6f6-1996fec6c585 | Open Energy Information

    Open Energy Info (EERE)

    Public Service Co of NM Effective date: 20140425 End date if known: Rate name: 12 Cogeneration and Small Power Production Substation Voltage (30B) Sector: Industrial Description:...

  6. Data:6fbc445b-a637-408d-a130-8a4f60db51ce | Open Energy Information

    Open Energy Info (EERE)

    service at transmission, substation and primary level service for qualifying cogeneration facilities. Facilities Charge, per kW of facilities demand: 5.75 Wholesale Demand...

  7. Indiana: EERE's Wireless Sensors Can Save Companies Millions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    demonstrated at an Alcoa facility in Evansville, Indiana. Within 30 minutes, the sensor network was operational. On one side of the plant, at an electrical substation, ORNL...

  8. RM Environment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buffalo Head Substation Project Adoption of Bureau of Land Management Environmental Assessment (Document No. WY-050-EA11-108) DOEEA - 1938 Environmental Assessment July 2012...

  9. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  10. CX-010588: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  11. Summary: The First Installment of the Quadrennial Energy Review

    Energy Savers [EERE]

    substations Distribution lines and distributed generation Electricity storage Other electric grid-related infrastructure Natural Gas Natural gas gathering lines Transmission...

  12. The impact of retail rate structures on the economics of commercial photovoltaic systems in California

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    Benefits of Distributed Photovoltaics to the Nevada PowerCarrying Capability of Photovoltaics in the United States. ”A Case Study of Photovoltaics Serving Kerman Substation. ”

  13. The Impact of Retail Rate Structures on the Economics of Commercial Photovoltaic Systems in California

    E-Print Network [OSTI]

    Mills, Andrew

    2009-01-01T23:59:59.000Z

    Benefits of Distributed Photovoltaics to the Nevada PowerCarrying Capability of Photovoltaics in the United States. ”A Case Study of Photovoltaics Serving Kerman Substation. ”

  14. EA-1366: Finding of No Significant Impact | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    line's connection (tap) to Portland General Electric's (PGE) Bethel Substation to improve transmission system reliability in the Salem area of northwestern Oregon. BPA would...

  15. EA-1366: Preliminary Environmental Assessment | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General...

  16. Microsoft Word - Summary of Presentations and Comments for QER...

    Broader source: Energy.gov (indexed) [DOE]

    technologies such as mobile gas insulated substations, spare recovery transformers, and smart transformers will help to improve the survivability and resiliency of the equipment....

  17. Recovery Act State Memos Vermont

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    million under the Smart Grid Investment Grant program to expand the deployment of Vermont smart meters, implement customer systems, secure control systems for substations and...

  18. Electrician- Journeyman

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) Mead...

  19. Microsoft Word - CX-WhiteBluffs_pole_work_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    August 9, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Alan Kjosness Civil Engineering Technician - TELP-TPP-3 Proposed Action: Swapping substation bay...

  20. Microsoft Word - CX-MountainAvenueDispositionFY12_WEB.doc

    Broader source: Energy.gov (indexed) [DOE]

    1, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Disposition of Mountain Avenue Substation and...

  1. Microsoft Word - CX-MalinBusFY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    9, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Bob Trismen Project Manager - TEP-CSB-1 Proposed Action: Malin Substation relay equipment replacements...

  2. Videos | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    F Reactor Inspection SRNL Laboratory Directed Research and Development Poster Session 351 Substation Demolition -- B Roll Swearing-In Deputy Secretary of Energy Dr. Elizabeth...

  3. Joint first-passage probability, and reliability of systems under Stochastic excitation

    E-Print Network [OSTI]

    Song, J; Kiureghian, A D

    2006-01-01T23:59:59.000Z

    and reliability of electrical substation equipment andthe reliability of a system of interconnected equipmentthe reliability of a system of inter- connected equipment

  4. CX-005010: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ostrander Substation AdditionCX(s) Applied: B4.11Date: 01/06/2011Location(s): Clackamas County, OregonOffice(s): Bonneville Power Administration

  5. Application for presidential permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to...

  6. STATEMENT OF CONSIDERATIONS REQUEST BY SUPERPOWER, INC. FOR AN...

    Broader source: Energy.gov (indexed) [DOE]

    design, build, install, test and operate a 138kv class prototype high temperature superconducting (HTS) fault current limiter (FCL) at a utility transmission substation. The...

  7. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a License Outgrant Agreement to Rocky Mountain Power (RMP) to install a single bus tower on . Western's Sinclair Substation propetty. RMP is requesting the Outgrant due to...

  8. Community Renewable Energy Deployment Provides Replicable Examples...

    Office of Environmental Management (EM)

    Haxtun substation with few additional improvements needed. At the request of Haxtun Wind, NREL facilitated conversations with potential off-takers. The Haxtun Wind project is...

  9. Microsoft Word - Ostrander Line Swap CX.doc

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 "Construction of electric power substations... or relocation of existing electric powerlines..."...

  10. A Brownian motor with real-time external steering and induced drifts along pre-designed paths

    E-Print Network [OSTI]

    Boyer, Edmond

    A Brownian motor with real-time external steering and induced drifts along pre-designed paths substates for a given ground state Fg, 1 hal-00504983,version1-22Jul2010 #12;and results in diffusion within, the resulting interference pattern creates a position-dependent potential for each Zeeman substate for a given

  11. A Virtual Laboratory for Micro-Grid Information and Communication Infrastructures

    E-Print Network [OSTI]

    Johansson, Karl Henrik

    for communication between distributed energy resources, building, substations, etc. To evaluate various ICT and substations; monitoring electricity consumption; adjusting the power consumption of household applications. Within the smart-grid design hierarchy, micro-grids represent localized power grids containing both

  12. Requestor's Name: Organization

    E-Print Network [OSTI]

    Paid 1) California Electric Transmission Lines Calif. Electric Transmission Grid showing 33 to 500 k). Data Source: AWS Truepower, 2006 A. Statewide Map - California Electric Transmission Lines and Substations: B. 2-Part Map Set (Upper & Lower) - California Electric Transmission Lines and Substations: C. 3

  13. Slide 1

    Broader source: Energy.gov (indexed) [DOE]

    AAR, 2005 TM Tight Turn Loop T r a n s i t T e s t T r a c k Substation 2 WRM Train Dynamics Track P r e c i s i o n T e s t T r a c k Balloon Loop Substation 1 I m p a c t T r...

  14. CX-006239: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Structure Replacement, Guernsey Rural Substation to Limestone Substation, Platte County, WyomingCX(s) Applied: B4.6Date: 10/02/2009Location(s): Platte County, WyomingOffice(s): Western Area Power Administration-Rocky Mountain Region

  15. Not Quickly, Just in Time: Improving the Timeliness and Reliability of Control Traffic in Utility Networks

    E-Print Network [OSTI]

    Correia, Miguel

    networks, that interconnect the CI facil- ities (e.g., transformation substations). This communication company (e.g., transformation substations), but in a distributed way with systems and applications often] and unavailability may become even more frequent due to denial-of-service attacks (DoS), e.g., ex- ecuted as cyber

  16. Mission Assurance and Cyber Security

    E-Print Network [OSTI]

    Memphis, University of

    , IPSes, TLS ZigBee X10 Wifi Smart Meter SubstationDistribution FAN/AMI Field Area Network SAN Substation assets Take action by remapping our business processes What is your attack surface look like? What threats ride on the ubiquitous attack surfaces of our infrastructure) #12;mccuskero@sonalysts.com 16 What

  17. Journal of Financial Crime --Vol. 6 No. 2 --Computer Crime COMPUTER CRIME

    E-Print Network [OSTI]

    Overill, Richard E.

    Journal of Financial Crime -- Vol. 6 No. 2 -- Computer Crime COMPUTER CRIME The IW Threat from Sub-State of the Informa- tion Warfare (IW) threat from sub-state radical political groups? Although there has been a great systems can be exploited to raise funds or to attack Government Information Infrastructures (GII

  18. MARCH 2013 VOLUME 8 NUMBER 3 ITIFA6 (ISSN 1556-6013) APRIL 2013 VOLUME 8 NUMBER 4

    E-Print Network [OSTI]

    He, Haibo

    shown in ArcMap 10.0 with substations and transmission lines (top) and its clustering result sets of heavy-loaded initial victims to perform attack schemes and evaluate the subsequent cascading of substations than those from the traditional load ranking and other clustering methods. As a result, this new

  19. Challenges for Cyber-Physical Systems: Security, Timing Analysis and Soft Error Protection

    E-Print Network [OSTI]

    Mueller, Frank

    from cyber attacks. While this assumption may not be sound, substations themselves are a more likely link at a substation) could allow attackers to affect power devices. Some protection could be provided to invest in research on the protection of the power grid, both from the perspective of cyber attacks

  20. PREDICTIVE YASIR: HIGH SECURITY WITH LOWER LATENCY IN LEGACY

    E-Print Network [OSTI]

    Smith, Sean W.

    . Introduction The United States built the power grid half a century ago, when network-based attacks were rare a partially unsecured slow legacy network. This network connects substations and control centers. In a control Processor (FEP), which exchanges messages with Data Ag- gregators (DA) in substations. A FEP and a DA

  1. Ultra wideband antenna array processing under spatial aliasing

    E-Print Network [OSTI]

    Shapoury, Alireza

    2009-05-15T23:59:59.000Z

    . : : : : : : : : : : : : : : : : : : : : : : 72 18 2.4 GHz measurement setup. : : : : : : : : : : : : : : : : : : : : : : 74 19 No-line-of-sight (NLOS) disposition of the instruments in a power substation. : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 75 20 Noise level... a project to explore the possibility of replacing the prohibitively expensive instrumentation and control wirings in the electric power substations, with the wireless solutions [2]. Several comprehensive fleld measure- ments and statistical analysis...

  2. Egg-Producing Values of Some Texas Feeding Stuffs.

    E-Print Network [OSTI]

    Harvey, R.N.

    1917-01-01T23:59:59.000Z

    BOARD, STATE SUBSTATIONS P L DOWNS, Temple, President .................................................................................... Term expires 1919 CAARLES ROGAN, Austin, Vice... CONTROL SERVICE I;. D. FULLER, hl. S., ClzicJ JAMES SULLIVAN. Erecrrtine Secretary J. H. ROGERS, Jn.~pector W. H. WOOD. Insnector S. n. PEARCE. ~nipe~ior \\V. M. WICKES. Inspeclor W. 1'. CIIRISTIAN, Insp~ctor SUBSTATION NO. 1: Beeville, Bee County...

  3. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303–326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 7–8 existing substations.

  4. J. Am. Chem. SOC.1994,116, 2049-2063 2049 Dynamics in Rugged Energy Landscapes with Applications to

    E-Print Network [OSTI]

    Thirumalai, Devarajan

    the Department of Chemistry, Boston University, Boston, Massachusetts 02215, and Department of Chemistry at which conformational substates separated by relatively small barriers (on the order of a few kcal separating the various peptide conformational substates. The distribution of energy barriers has a constant

  5. Impact of Industrial Electric Rate Structure on Load Management - A Utility Viewpoint

    E-Print Network [OSTI]

    Richardson, J. A.

    1984-01-01T23:59:59.000Z

    , you will need to plan to build and maintain your substation.' Today our response would be more like 'How soon can you be ready? Can we build and/or maintain your substation for you? Perhaps we can locate a transformer for you to use until permanent...

  6. Intern experience at Electricity Directorate of Bahrain: an internship report

    E-Print Network [OSTI]

    Aljamea, Najeeb Ahmad

    2013-03-13T23:59:59.000Z

    n ......................................27 8. A VDU Picture of a Substation .............................................................. 35 9. A VDU Picutre of the Alarm List................................................................ 38 10... consists of : - Over-head lines : 33kv &66kv - Underground cables : 33kv & 66kv & 220kv - Substations: 33 /llkv & 66 /llkv & 220/66kv. Associated with this equipment is a protection system which utilises a network of pilot cables. The transmission...

  7. An Outer Membrane Protein Undergoes Enthalpy-and Entropy-Driven Transitions

    E-Print Network [OSTI]

    Movileanu, Liviu

    of Massachusetts Medical School, Worcester, Massachusetts 01605, United States § Syracuse Biomaterials Institute ABSTRACT: -Barrel membrane proteins often fluctuate among various open substates, yet the nature distinguishable, time-resolvable open substates. Native and loop-deletion OccK1 proteins showed substantial

  8. Assessing the Vulnerability of Replicated Network George Dean Bissias, Brian Neil Levine, and Ramesh K. Sitaraman

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    , and Ramesh K. Sitaraman Dept. of Computer Science, Univ. of Massachusetts Amherst, USA {gbiss% of the substations from all generators; on a large wireless mesh network disrupting 5% of wireless links between autonomous systems (i.e., servers). In a power grid, each substation (i.e., client) connects to one

  9. E. L. BRADY AND M. DEUTSCH yields very definite information concerning the parities

    E-Print Network [OSTI]

    Browder, Tom

    of Physics and Chemistry Department, Massachusetts Institute of Technology, Cambridge, MassachusettsGect. Unfortunately, it seems at present entirely unfeasible to separate the nuclear magnetic substates by application been proposed to change the relative populations of the several mag- netic substates of an excited

  10. Sampling Methods for Action Selection in Influence Diagrams Luis E. Ortiz

    E-Print Network [OSTI]

    Ortiz, Luis

    Artificial Intelligence Laboratory Massachusetts Institute of Technology 545 Technology Square Cambridge, MA, the prob- abilities of the sub-states of the system directly relevant to our utility in order to evaluate the expected utility or value of each action. A sub-state is formed from the state of a sub- set of variables

  11. Overview of BNL's Solar Energy Research Plansgy

    E-Print Network [OSTI]

    Homes, Christopher C.

    Overview of BNL's Solar Energy Research Plansgy March 8, 2011, #12;Outline O i f th LISF S l PV P j Field LIPA Substation South Array Field LIPA Substation #12;#12;#12;BNL is developing a solar energy, February 2009 · EERE Renewable Systems interconnection Study, February 2008 · EERE Solar Energy Technology

  12. Solar Grid Integration Industrial Research Perspectives

    E-Print Network [OSTI]

    Homes, Christopher C.

    with 25 inverters) Substation 1 Substation 2 Solar Power Generation Wind Generation 100 MW Wide variety of power levels and grid connections #12;5 Presenter and Event 3/30/2011 PV Generation Segmentation 1 and Event 3/30/2011 Essential PV power plant features Reliable power conversion Extensive service network

  13. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will evaluate the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon.

  14. EIS-0474: Southline Transmission Line Project; Arizona and New Mexico

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of the proposed Southline Transmission Project, which would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations.

  15. Wireless Sensor Networks for the Protection of an Electrical Energy Distribution Infrastructure

    E-Print Network [OSTI]

    Boyer, Edmond

    to be protected.. In this paper solutions to increase the safety aspects of substation components, power lines and power transformers are discussed. Also security solutions related to perimeter intrusion detection in substations and remote surveillance of power transformer installations are introduced. All the solutions

  16. This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination. IEEE TRANSACTIONS ON POWER SYSTEMS 1

    E-Print Network [OSTI]

    Dobson, Ian

    in substation . Transmission line is the line sharing right of way with . B. Defender's Decision Variables Parameters Set of transmission lines and transformers (assumed to be directed to facilitate formulation). Set of buses. Set of transformers. Set of substations. Set of generators. Cost of adding units to transmission

  17. EIS-0267: BPA/Lower Valley Transmission System Reinforcement Project, Wyoming

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA and LVPL proposal to construct a new 115-kV line from BPA’s Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA’s Teton Substation near Jackson in Teton County, Wyoming.

  18. IMPULSIVE NOISE MODELLINGAND PREDICTION OF ITS IMPACT ON THE PERFORMANCE OF WLAN RECEIVER

    E-Print Network [OSTI]

    Atkinson, Robert C

    with the deployment of wireless equipment in electricity substations the BER performance of IEEE 802.11b and IEEE 802. INTRODUCTION Deployment of wireless communications equipment in electricity substation for monitoring, control of convenience, flexibility and cost [1, 2]. Typically wireless transceiver designs are based on the assumption

  19. Preprint of the paper "A Boundary Element Numerical Approach for Earthing Grid Computation"

    E-Print Network [OSTI]

    Colominas, Ignasi

    ~na, SPAIN Abstract Analysis and design of substation earthing involves computing the equivalent re- sistance in the margin of error [4]. A Boundary Element approach for the numerical computation of substation grounding introduced in the BEM formulation to reduce computational cost for speci#12;c choices of the test and trial

  20. Intelligent Agents And Distributed Models For

    E-Print Network [OSTI]

    Mitchell, Richard

    high development costs Computer Supported Cooperative work growing field; seemed appropriate here #12 with outages, maintenance (Real) Example Switching Scenarios 10 outage and substation rearrangements environment substation settings, in the example Desires process active automata to final state (ie to finish

  1. Preprint of the paper "High performance computing for the analysis and postprocessing of earthing

    E-Print Network [OSTI]

    Colominas, Ignasi

    in certain places of the substation site. Its main objective is the transport and dissipation of electrical been systematically reported, such as the large computational costs required in the anal- ysis of real the construction of the substation produces a stratified soil, or as a con- sequence of a chemical treatment

  2. UML and Concurrency Perdita Stevens

    E-Print Network [OSTI]

    Stevens, Perdita

    premature decisions about ordering of events. 6 #12;Basic "flow chart" activity diagram Calculate total cost Get authorisation Charge account [else] [cost>$50] 7 #12;Concurrency in activity diagrams A1 A2 A3 8-fork = enter state with n concurrent substates n-join = leave state with n concurrent substates This severely

  3. > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--This paper presents a method to identify failures in

    E-Print Network [OSTI]

    Hadjicostis, Christoforos

    integration with automated analysis of the event data provided at various substations. The infrastructure at the substation by intelligent electronic devices (IEDs) [1]. This vision of power systems allows the implementation of new network management strategies in order to reduce costs by applying Demand Side Management

  4. Dynamic-Priority based Event-Driven Communication in Smart Grid

    E-Print Network [OSTI]

    Mazumder, Sudip K.

    classes of load-demands and the EMS processing cost. The performance evaluation results show to the load EMS (for aggregation) using an underlying NAN. The load EMS communicates with the sub-station EMS Station EMS Distribution Substation Utility DER 1 Power Bus Communication Interface Wide Area Network DER

  5. EIS-0395: San Luis Rio Colorado Project, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to construct and operate a proposed transmission line originating at the proposed San Luis Rio Colorado (SLRC) Power Center in Sonora, Mexico, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company’s (APS) North Gila Substation

  6. atlanta: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    her own unique Gaucher, Eric 9 GDOT Viaduct at International Boulevard near CNN, Atlanta Engineering Websites Summary: N)TopDeflection,wt(mm) Qt Predicted O-cell top down O-cell...

  7. atlanta international airport: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Technology 2013-01-01 6 GDOT Viaduct at International Boulevard near CNN, Atlanta Engineering Websites Summary: N)TopDeflection,wt(mm) Qt Predicted O-cell top down O-cell...

  8. Fingerprint Classification using Fast Fourier Transform

    E-Print Network [OSTI]

    Park, Haesun

    Minneapolis, MN 55455, USA chpark, hpark @cs.umn.edu Abstract In this paper, we present a new approach, USA. ÞH. Park is in the National Science Foundation, 4201 Wilson Boulevard, Arlington, Virginia 22230

  9. Voices from the Fisheries NOAA FISHERIES SERVICE

    E-Print Network [OSTI]

    Fisheries Knowledge,LinkingGenerations,and Improving Environmental Literacy Julie Bartsch Susan Abbott School and Community Trust #12;Julie Bartsch The Rural School and Community Trust 1530 Wilson Boulevard

  10. Stability Index of Interaction forms Joseph Abdou

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Stability Index of Interaction forms Joseph Abdou December 15, 2008 Abstract An interaction form, 106-112 boulevard de l'H^opital 75647 Paris Cedex 13 - France; email: abdou@univ-paris1.fr 1 halshs

  11. Truncated hexa-octahedral magnetite crystals in ALH84001: Presumptive biosignatures

    E-Print Network [OSTI]

    , PQ H3A 2A7, Canada; and Savannah River Ecology Laboratory, Drawer E, University of Georgia, Aiken, SC of Geological and Planetary Sciences, 1200 East California Boulevard, Pasadena, CA 91125; National Aeronautics

  12. MEETING OF THE WATERS FETZER FIELD

    E-Print Network [OSTI]

    North Carolina at Chapel Hill, University of

    -PASS BIOLOGY RES. MOLECULAR WEST NEW EAST DRIVE CHILLER MED. B BERNARD STREET SERVICE COMMUNITY PUREFOY CENTER PARKING DECK & COBB CHILLER PAULHARDINDRIVE Martin Luther King, Jr. Boulevard HILL ALUMNI CENTER C

  13. MEETING OF THE WATERS FETZER FIELD

    E-Print Network [OSTI]

    North Carolina at Chapel Hill, University of

    -PASS BIOLOGY RES. MOLECULAR WEST NEW EAST DRIVE CHILLER MED. B BERNARD STREET SERVICE COMMUNITY PUREFOY CENTER PARKING DECK & COBB CHILLER PAULHARDINDRIVE Martin Luther King, Jr. Boulevard HILL ALUMNI CENTER

  14. Welcome to Berkeley! Locations and Orientation

    E-Print Network [OSTI]

    Jacobs, Lucia

    a car *Rent an electric bike ­ Green Choice Motto on Bancroft and Bowditch, electric bike for $10/hour "Biking Boulevards" or bicycle priority streets for routes with fewer cars. For more information visit

  15. *indicates change 1 BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT

    E-Print Network [OSTI]

    BAPPLICATION FOR CERTIFICATION Docket No. 09-AFC-10 FOR THE RICE SOLAR ENERGY POWER PLANT PROJECT PROOF Manager Solar Reserve 2425 Olympic Boulevard, Ste. 500 East Santa Monica, CA 90404 Jeffrey

  16. PETITION FOR INSIGNIFICANT PROJECT MODIFICATION

    E-Print Network [OSTI]

    Cosumnes River Boulevard Interchange SMUD Cogeneration Pipeline Project Docket No. 92-AFC-2P July 2007, CA 95833 #12;SMUD COGENERATION PIPELINE PROJECT Table of Contents K:\\Wprocess\\25832\\SMUD

  17. DOI: 10.1542/peds.2008-1606 2009;123;1383-1391Pediatrics

    E-Print Network [OSTI]

    Dobkins, Karen R.

    by the American Academy of Pediatrics, 141 Northwest Point Boulevard, Elk publication, it has been published; iDepartment of Psychiatry, University of North Carolina, Chapel Hill, North Carolina; j

  18. DOI: 10.1542/peds.2009-0958 published online Nov 30, 2009;Pediatrics

    E-Print Network [OSTI]

    California at Davis, University of

    by the American Academy of Pediatrics, 141 Northwest Point Boulevard, Elk publication, it has been publishedDepartment of Psychiatry, University of North Carolina, Chapel Hill, North Carolina; cDepartment of Psychology, e

  19. EIS-0453: Recapitalization of Infrastructure Supporting Naval...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Room 2251 N. Boulevard Idaho Falls, ID 83402 Telephone: (208) 526-1185 Marshall Public Library 113 South Garfield Pocatello, ID 83204 Telephone: (208) 232-1263 Idaho Falls Public...

  20. WORKING PAPER N 2009 -41 Migration and capital accumulation

    E-Print Network [OSTI]

    Boyer, Edmond

    , remittances, capital accumulation, rural poverty PARIS-JOURDAN SCIENCES ECONOMIQUES LABORATOIRE D. Key Words: Migration; Remittances; Capital Accumulation; Rural Poverty. Paris School of Economics (PSE) and Poverty Action Lab (J-PAL Europe), 48 Boulevard Jourdan, 75014 Paris, France. chiodi

  1. Riverpoint Campus Master Plan Update

    E-Print Network [OSTI]

    Collins, Gary S.

    Design and construct pedestrian-bike bridge Re-design Spokane Falls Boulevard Link adjacent areas: CBD Space Framework #12;Open Space Framework #12;#12;#12;#12;Gateways and Identity #12;CSU Monterey Bay #12

  2. The Vehicle Technologies Market Report

    E-Print Network [OSTI]

    The Vehicle Technologies Market Report Center for Transportation Analysis 2360 Cherahala Boulevard Efficiency Transportation: Energy Environment Safety Security Vehicle Technologies T he Oak Ridge National Laboratory's Center for Transportation Analysis developed and published the first Vehicle Technologies Market

  3. Endocrinology . Author manuscript The inflammatory response in acyl-CoA oxidase 1 deficiency

    E-Print Network [OSTI]

    Boyer, Edmond

    - Cancer1 INSERM : U866 , Universit de Bourgogne, Facult de M decineé é é , 7, boulevard Jeanne d Arc BP, infantile seizures, loss of motor achievements, and white matter demyelination (3 6). P-NALD disease is due

  4. Residential fabric as a memorable city form : a study of West London and Bath

    E-Print Network [OSTI]

    Dalal, Pradeep

    1991-01-01T23:59:59.000Z

    The thesis explores the idea of an 'intermediate order' in city form, one that lies between texture and monument, as an attempt to explain the form of London. Unlike Paris, London does not have a grand order of boulevards, ...

  5. Friends of Lehigh University LEHIGH UNIVERSITY 1 Anonymous ++

    E-Print Network [OSTI]

    Gilchrist, James F.

    . Brown Joseph R. Brown Kimberly Brown William R. Brown Caryl G. Browse R. N. Brummer Jean C. Buck `64W. Campbell John Campbell Maria Canada Arlene E. Cannon Peter Cantor Faust E. Capobianco IV Eleanor M. Carey

  6. Edinburgh Research Explorer Parasite-Derived MicroRNAs in Host Serum As Novel Biomarkers

    E-Print Network [OSTI]

    Millar, Andrew J.

    , Norman Nausch1 , Thorsten Forster3 , Frances Jones4 , Narcis B. Kabatereine5 , David W. Dunne4 , Francisca Mutapi1 , Andrew S. MacDonald1,6 , Amy H. Buck1 * 1 Centre for Immunity, Infection and Evolution

  7. Protein activation of a ribozyme: the role of bacterial RNase P protein

    E-Print Network [OSTI]

    Pace, Norman

    Protein activation of a ribozyme: the role of bacterial RNase P protein Amy H Buck1 , Andrew B Dalby2 , Alexander W Poole2,3 , Alexei V Kazantsev2 and Norman R Pace2, * 1 Department of Chemistry

  8. RESEARCH ARTICLE Open Access Genetic susceptibility to Chagas disease

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1,2 , Ariana de Melo Borges3 , Paula Buck1 , Fabrício Dias5 , Monique Baron1 , Ludmila Rodrigues of innate and adaptive immunity genes with CCC development. Migration of Th1-type T cells play a major role

  9. 692 | VOL.4 NO.9 | SEPTEMBER 2007 | NATURE METHODS NEWS AND VIEWS

    E-Print Network [OSTI]

    Cai, Long

    a motorized tracking system. The researchers used this chip to verify the functional role of an inter- neuron modulators with herpes simplex virus Daniel N Cortright,Marianne E Buck & James E Krause An innovative use

  10. advanced concept system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and John R. Buck October 2001 Proceedings of the 31st ASEEIEEE Frontiers in Education Conference 31st ASEEIEEE Frontiers in Education Conference F2A-2 DEVELOPMENT OF THE...

  11. Longitudinal ultrasound measurement of the equine third metacarpal bone as a predictor of mechanical testing properties 

    E-Print Network [OSTI]

    Dyer, Stephanie Ann

    1999-01-01T23:59:59.000Z

    diagnostic technique to identify the onset of bucked shins. The purpose of this study was to determine if the longitudinal speed of sound as measured by Soundscan 2000[] was an appropriate predictor of bone strength characterized by mechanical testing...

  12. Let's talk about symbiosis! 9:15 Matthias Horn, Department of Microbiology and Ecosystem Science

    E-Print Network [OSTI]

    of Microbiology and Ecosystem Science Welcome Session 1 9:30 Julie Klose Session 2 11:30 Buck Hanson, Department of Microbiology and Ecosystem Science 13:30 Daryl Domman, Department of Microbiology and Ecosystem Science

  13. Effects of trace metals on diatom export products from the euphotic zone and significance for biogeochemical cycles

    E-Print Network [OSTI]

    Richter, Daniel J.

    metal are also reported (Cu from Coale and Bruland, 1988;Zn from Bruland, 1989; Cd from Lane et al. , 2008). Free52:843–855. Buck, K. N. and Bruland, K. W. (2005). Copper

  14. Phytoplankton responses to atmospheric metal deposition in the coastal and open-ocean Sargasso Sea

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    J. Exp. Mar. Biol. Ecol. 96, Bruland, K. W. , Donat, J. R. ,Buck, K. N. , and Bruland, K. W. (2005). Copper speciationA. , Beck, A. , Biller, D. , Bruland, K. , Measures, C. , et

  15. Microbial iron cycling on Trichodesmium colonies : laboratory culture studies of Trichodesmium and associated model organisms

    E-Print Network [OSTI]

    Roe, Kelly Lynn

    2012-01-01T23:59:59.000Z

    Barbeau, K. , Rue, E.L. , Bruland, K.W. , and Butler, A. (Buck, K.N. , and Bruland, K.W. (2007) The physicochemicalBarbeau, K. , Rue, E.L. , Bruland, K.W. , and Butler, A. (

  16. Poetry, prayer, and pedagogy: writings by and for the English Catholic community, 1547-1650

    E-Print Network [OSTI]

    Garcia, Patricia Marie

    2009-05-15T23:59:59.000Z

    of John Donne, Robert Southwell, Richard Crashaw, and Elizabeth Cary, as well as in the instructional works by lesser-known Catholic writers including John Fowler, Thomas Wright, John Bucke, Henry Garnet, Gaspar Loarte, John Mush, Jeanne de Cambray...

  17. 2008 WINNERS College of Science & Engineering

    E-Print Network [OSTI]

    LINES By: Molly Klein-McDowell, Graeme Hodgson (UCSF), Wen-Lin Kuo (LBNL), Andrei Goga (UCSF), Dr. Chris Benz (Buck Institute), Dr. Joe W. Gray (LBNL), Dr. Paul Yaswen (LBNL) Cell and Molecular Biology

  18. Watch their Moves: Applying Probabilistic Multiple Object Tracking to Autonomous Robot Soccer

    E-Print Network [OSTI]

    Cremers, Daniel

    Thorsten Schmitt, Michael Beetz, Robert Hanek, and Sebastian Buck Munich University of Technology soccer must know where their opponents are in order to make the right moves and plays (Beetz et al. 2002

  19. Building a landscape for dwelling

    E-Print Network [OSTI]

    Raphael, Michael B

    1981-01-01T23:59:59.000Z

    This thesis is an examination of future growth outside of the towns and suburban developments in Upper Bucks County, Pennsylvania. Its aim is to offer projections for inhabitable physical form. These projections will be ...

  20. BioMass No. 03 page 3 Spring 2001 Alumni Mailbag

    E-Print Network [OSTI]

    Kunkel, Joseph G.

    MAT. I am retired now (2 years) after a 30 year career as a biology teacher. Mary A. Anderson, '68 BS. Captain Mary Alice (Buck) Anderson, Medical Corps, USN assumed command of the Naval Aerospace Medical