National Library of Energy BETA

Sample records for buck boulevard substation

  1. TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS The displacement or deferral of substation...

  2. Substation automation problems and possibilities

    SciTech Connect (OSTI)

    Smith, H.L.

    1996-10-01

    The evolutionary growth in the use and application of microprocessors in substations has brought the industry to the point of considering integrated substation protection, control, and monitoring systems. An integrated system holds the promise of greatly reducing the design, documentation, and implementation cost for the substation control, protection, and monitoring systems. This article examines the technical development path and the present implementation problems.

  3. Substation alarm multiplexing system (SAMS)

    SciTech Connect (OSTI)

    ElBadaly, H.; Gaughan, J.; Ward, G.; Amengual, S.

    1996-03-01

    This paper describes an on going R&D project to develop, design, install, and assess the field performance of an advanced substation alarm system. SAMS provides a highly fault-tolerant system for the reporting of equipment alarms. SAMS separates and identifies each of the multiple alarm contacts, transmits an alarm condition over existing substation two-wire system, and displays the alarm source, and its associated technical information, on a touch-screen monitor inside the substation control room, and a remote central location and on a hand held terminal which may be carried anywhere within the substation. SAMS is currently installed at the Sherman Creek substation in the Bronx for the purpose of a three month field evaluation.

  4. The Combustion Institute 5001 Baum Boulevard

    E-Print Network [OSTI]

    Tennessee, University of

    The Combustion Institute 5001 Baum Boulevard Pittsburgh, Pennsylvania, USA 15213-1851 CENTRAL STATES SECTION OF THE COMBUSTION INSTITUTE CALL FOR PAPERS TECHNICAL MEETING - SPRING 2002 COMBUSTION 7-9, 2002 #12;CENTRAL STATES SECTION OF THE COMBUSTION INSTITUTE www.cssci.org CALL FOR PAPERS

  5. Bidirectional buck boost converter

    DOE Patents [OSTI]

    Esser, A.A.M.

    1998-03-31

    A bidirectional buck boost converter and method of operating the same allows regulation of power flow between first and second voltage sources in which the voltage level at each source is subject to change and power flow is independent of relative voltage levels. In one embodiment, the converter is designed for hard switching while another embodiment implements soft switching of the switching devices. In both embodiments, first and second switching devices are serially coupled between a relatively positive terminal and a relatively negative terminal of a first voltage source with third and fourth switching devices serially coupled between a relatively positive terminal and a relatively negative terminal of a second voltage source. A free-wheeling diode is coupled, respectively, in parallel opposition with respective ones of the switching devices. An inductor is coupled between a junction of the first and second switching devices and a junction of the third and fourth switching devices. Gating pulses supplied by a gating circuit selectively enable operation of the switching devices for transferring power between the voltage sources. In the second embodiment, each switching device is shunted by a capacitor and the switching devices are operated when voltage across the device is substantially zero. 20 figs.

  6. Bidirectional buck boost converter

    DOE Patents [OSTI]

    Esser, Albert Andreas Maria (Niskayuna, NY)

    1998-03-31

    A bidirectional buck boost converter and method of operating the same allows regulation of power flow between first and second voltage sources in which the voltage level at each source is subject to change and power flow is independent of relative voltage levels. In one embodiment, the converter is designed for hard switching while another embodiment implements soft switching of the switching devices. In both embodiments, first and second switching devices are serially coupled between a relatively positive terminal and a relatively negative terminal of a first voltage source with third and fourth switching devices serially coupled between a relatively positive terminal and a relatively negative terminal of a second voltage source. A free-wheeling diode is coupled, respectively, in parallel opposition with respective ones of the switching devices. An inductor is coupled between a junction of the first and second switching devices and a junction of the third and fourth switching devices. Gating pulses supplied by a gating circuit selectively enable operation of the switching devices for transferring power between the voltage sources. In the second embodiment, each switching device is shunted by a capacitor and the switching devices are operated when voltage across the device is substantially zero.

  7. Conference James F.Buckli

    SciTech Connect (OSTI)

    None

    2008-02-07

    L'association du personnel a le plaisir d'accueillir Mons. James F.Buckli, astronaute, né en 1947. Il a participé à la mission Space Lab D1 qui pour la première fois mettait 8 personnes sur orbite.L'ass.du pers. remercie aussi Gordon White(s) de la mission américaine d'avoir permis d'organiser cette conférence

  8. Conference James F.Buckli

    ScienceCinema (OSTI)

    None

    2011-04-25

    L'association du personnel a le plaisir d'accueillir Mons. James F.Buckli, astronaute, né en 1947. Il a participé à la mission Space Lab D1 qui pour la première fois mettait 8 personnes sur orbite.L'ass.du pers. remercie aussi Gordon White(s) de la mission américaine d'avoir permis d'organiser cette conférence

  9. Wolf Point Substation, Roosevelt County, Montana

    SciTech Connect (OSTI)

    Not Available

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

  10. VULNERABILITY OF BLUETOOTH TO IMPULSIVE NOISE IN ELECTRICITY TRANSMISSION SUBSTATIONS

    E-Print Network [OSTI]

    Atkinson, Robert C

    be routed around electricity substation compounds wirelessly. Furthermore, wireless communication with the deployment of Bluetooth (and other similar wireless technologies) in electricity substations for controlVULNERABILITY OF BLUETOOTH TO IMPULSIVE NOISE IN ELECTRICITY TRANSMISSION SUBSTATIONS S A Bhattil

  11. Cyber Security in Smart Grid Substations

    E-Print Network [OSTI]

    Utrecht, Universiteit

    Cyber Security in Smart Grid Substations Thijs Baars Lucas van den Bemd Michail Theuns Robin van.089 3508 TB Utrecht The Netherlands #12;CYBER SECURITY IN SMART GRID SUBSTATIONS Thijs Baars T.Brinkkemper@uu.nl Abstract. This report describes the state of smart grid security in Europe, specifically the Netherlands

  12. Earth resistivity measurement near substation ground grids

    SciTech Connect (OSTI)

    Lodwig, S.G.; Mateja, S.A. [ComEd, Chicago, IL (United States)

    1996-11-01

    Proper substation grounding grid design requires good, accurate soil resistivity measurements. This data is essential to model the substation ground grid to design a safe ground grid with a satisfactory ground grid resistance at minimum cost. For substations with several decades of service, there is some concern that a grid may have deteriorated, been damaged during equipment installation or excavation, or that initial soil resistivity measurements were lost or may not have been correctly performed. Ground grid conductors change the substation surface voltage distribution. Any voltage measurements taken at the complete substation will also vary from the tests made without conductors present. During testing, current was injected in the soil by probes placed near the ground grid. The current tends to follow the ground grid conductors since copper is a far better conductor than the soil it is placed in. Resistance readings near grids will be lower than readings in undisturbed soil. Since computer models were unavailable for many years, analyzing the effect of the grid conductors on soil resistivity measurements was very difficult. As a result, soil resistivity measurements made close to substations were of little use to the engineer unless some means of correcting the measured values could be developed. This paper will present results of soil resistivity measurements near a substation ground grid before and after a ground grid has been installed and describes a means of calculating the undisturbed soil model.

  13. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  14. 29 boulevard Gergovia 63 000 Clermont-Ferrand

    E-Print Network [OSTI]

    Sart, Remi

    , boulevard Gergovia), secteurs Lettres et Sciences humaines dont Tourisme et Métiers du Livre. le site Carnot (34, avenue Carnot), secteurs Langues, L'UFR LLSH regroupe les services suivants : 14 départements d Maison des sciences de l'homme (MSH). Le site Gergovia abrite également : une bibliothèque 1er cycle

  15. Landowners lead successful Buck Creek restoration 

    E-Print Network [OSTI]

    Boutwell, Kathryn S.

    2012-01-01

    manager for Buck Creek, said that in ????, landowners took the initiative to secure the scienti?c information needed to be?er evaluate both water quality in the creek as well as potential sources of bacteria across the watershed. Using funding secured... from the Texas State Soil and Water Conservation Board?s Clean Water Act provided by the EPA, the Buck Creek restoration e?ort began. Initially, AgriLife sta? collected water quality data and conducted a source survey of the watershed, according...

  16. Utility programs for substation diagnostics development

    SciTech Connect (OSTI)

    NONE

    1996-03-01

    This article is a brief overview of the opening remarks of the utility panel. These remarks developed a number of interesting substation diagnostic activities and concepts in which the electric utilities are engaged and outlined the considerations which must accompany development of diagnostic sensors and systems. These area include transformer diagnostics, circuit breaker diagnostics, and testing/cost of diagnostic systems.

  17. The Buck Institute Turned to Geothermal

    E-Print Network [OSTI]

    The Buck Institute Turned to Geothermal Heating and Cooling for Significant Savings on Energy with the goal of sustaining the healthy years of life... #12;Geothermal Exchange #12;§ Cooling Tower: One. Other Challenges to the Original Central Plant: #12;The geothermal well field replaces the cooling tower

  18. Modeling and Simulating Blast Effects on Electric Substations

    SciTech Connect (OSTI)

    Lyle G. Roybal; Robert F. Jeffers; Kent E. McGillivary; Tony D. Paul; Ryan Jacobson

    2009-05-01

    A software simulation tool was developed at the Idaho National Laboratory to estimate the fragility of electric substation components subject to an explosive blast. Damage caused by explosively driven fragments on a generic electric substation was estimated by using a ray-tracing technique to track and tabulate fragment impacts and penetrations of substation components. This technique is based on methods used for assessing vulnerability of military aircraft and ground vehicles to explosive blasts. An open-source rendering and ray-trace engine was used for geometric modeling and interactions between fragments and substation components. Semi-empirical material interactions models were used to calculate blast parameters and simulate high-velocity material interactions between explosively driven fragments and substation components. Finally, a Monte Carlo simulation was added to model the random nature of fragment generation allowing a skilled analyst to predict failure probabilities of substation components.

  19. Data collecting and processing for substation integration enhancement 

    E-Print Network [OSTI]

    Jakovljevic, Sasa

    2004-09-30

    to collect and process data from such computer-based devices. An advanced data collecting and processing solution is developed and implemented as Integrated Substation Software in an effort to enhance substation integration. This report describes a... and processing is automated and repeated in equidistant time intervals. Results of processing and related reports are concisely displayed on the user interface screen and exported through data files. The Substation Integration Software was tested through...

  20. Benefits of Using Mobile Transformers and Mobile Substations...

    Office of Environmental Management (EM)

    Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service: a Report to the United States Congress Pursuant to Section 1816 of the Energy Policy Act...

  1. Requirements Specification for and Evaluation of an Automated Substation Monitoring System

    E-Print Network [OSTI]

    Requirements Specification for and Evaluation of an Automated Substation Monitoring System Mladen) and other monitoring sensors and devices installed in the substation. With this variety of installed IEDs

  2. Abstract--With the deregulation and restructuring of utility industry, many substation automation applications are being

    E-Print Network [OSTI]

    and Data Acquisition (SCADA), substation switching, transients simulation I. INTRODUCTION ITH Control and Data Acquisition (SCADA) and Energy Management System (EMS) applications of substation

  3. Bifurcation in a System of Coupled Buck Converters Herbert H. C. Iu

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    electronic regulators (e.g. buck converter, boost converter and buck-boost converter) have been thoroughlyBifurcation in a System of Coupled Buck Converters Herbert H. C. Iu , Chi K. Tse and Octavian the bifurcation behaviour of a system of coupled buck converters under current-mode control. The effects due

  4. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  5. Water Quality Monitoring in the Buck Creek Watershed and Facilitation of Buck Creek Watershed Partnership 

    E-Print Network [OSTI]

    Gregory, L.; Dyer, P.

    2013-01-01

    & 20376); two are in AU 0207A_02 (stations 20365 & 20368) and one is located on a tributary of the creek (station 20367). Building on this recommendation, two additional sites were included in the Interim Monitoring project. These added stations... the Interim Monitoring project Table 1. Water quality monitoring station descriptions Project? Site?No.?? TCEQ? Monitoring? Station?No.? General?Station?Location?&?Description? County? TCEQ Assessment Unit Station is Located In BC 03 20365 Buck...

  6. The University of North Carolina at Charlotte 9201 University City Boulevard

    E-Print Network [OSTI]

    Howitt, Ivan

    The University of North Carolina at Charlotte 9201 University City Boulevard Charlotte, NC 28223-0001 Non-North Carolina Community College Transfer Guide into the College of Computing and Informatics

  7. The University of North Carolina at Charlotte 9201 University City Boulevard

    E-Print Network [OSTI]

    Howitt, Ivan

    The University of North Carolina at Charlotte 9201 University City Boulevard Charlotte, NC 28223-0001 North Carolina Community College Transfer Guide into the College of Computing and Informatics All

  8. Designing an ultra low quiescent current buck switching regulator

    E-Print Network [OSTI]

    Gardner, John Underhill

    2008-01-01

    The new buck regulator proposed in this thesis was designed to operate with only a few micro-amps of supply current during no load output conditions, while maintaining low output voltage ripple. The regulator also has high ...

  9. Peak power tracking for a solar buck charger

    E-Print Network [OSTI]

    Cohen, Jeremy Michael, M. Eng. Massachusetts Institute of Technology

    2010-01-01

    This thesis discusses the design, implementation, and testing of a buck converter with peak power tracking. The peak power tracker uses a perturb and observe algorithm to actively track the solar panel's peak power point ...

  10. A Dual Supply Buck Converter with Improved Light Load Efficiency 

    E-Print Network [OSTI]

    Chen, Hui

    2013-05-02

    Power consumption is the primary concern in battery-operated portable applications. Buck converters have gained popularity in powering portable devices due to their compact size, good current delivery capability and high efficiency. However...

  11. APS team works smarter, cuts substation construction costs by 36%

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

  12. Fourth Avenue and University Boulevard This area of the project includes 4th Avenue from the 4th Avenue underpass to University Boulevard, University

    E-Print Network [OSTI]

    McCallum, William G.

    Fourth Avenue and University Boulevard This area of the project includes 4th Avenue from the 4th will begin underground utility work in the intersection of Sixth Street at Fourth Avenue. The work is expected to be complete by May 11, 2012. The intersection of Sixth Street at Fourth Avenue will be reduced

  13. National SCADA Test Bed Substation Automation Evaluation Report

    SciTech Connect (OSTI)

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  14. Aalborg Universitet Two phase interleaved buck converter for driving high power LEDs

    E-Print Network [OSTI]

    Munk-Nielsen, Stig

    Aalborg Universitet Two phase interleaved buck converter for driving high power LEDs Beczkowski. (2011). Two phase interleaved buck converter for driving high power LEDs. In Proceedings of the 14th #12;Two phase interleaved buck converter for driving high power LEDs Szymon Bczkowski, Stig Munk

  15. I-A Modulated Digitally Controlled Non-Inverting Buck-Boost Converter for

    E-Print Network [OSTI]

    I-A Modulated Digitally Controlled Non-Inverting Buck-Boost Converter for WCDMA RF Power Amplifiers.edu Abstract- This paper focuses on the non-inverting buck- boost converter supplying an adjustable DC voltage the WCDMA RFPA settling time requirements. 1. INTRODUCTION Non-inverting buck-boost DC-DC power converter

  16. Bifurcation in Parallel-Connected Buck Converters under Current-Mode Control

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    converter, boost converter and buck-boost converter) have been thoroughly studied in the past decade [1], [2Bifurcation in Parallel-Connected Buck Converters under Current-Mode Control H. H. C. Iu School a system of parallel-connected dc/dc buck converters under current-mode control. The effects of variations

  17. Integrated substation looks like one RTU to dispatchers

    SciTech Connect (OSTI)

    Koch, W.

    1995-12-01

    Traditionally, supervisory control and data acquisition systems (Scada) use a master/slave arrangement. The master Scada computer polls individual circuit devices for information, or the devices may report (by exception) to the computer. The substation engineering department of Portland General Electric Co (PCE) is now pioneering a new arrangement in which all devices in a substation communicate with each other and a local computer over a data bus. A single communications line connects the Scada master to the same bus for control and/or monitoring. The new approach is known as a substation integration system (SIS). Thus, for a lower initial cost, substation integration: eliminates the need for redundant equipment - such as panel meters, annunciators, transducers, sequence-of-event recorders, auxiliary tripping relays. Scada RTU, control, and transfer switches; reduces control house size by 25% by reducing wiring and using panel space more efficiently; provides a standardized user interface for easy data access, both locally and remotely; is flexible and expandable because of its modularity and use of non-proprietary hardware and software; improves operability, maintainability and reliability through immediate access to key data; and, reduces overall life-cycle costs by reducing travel and outage time through remote access to substation information. 5 figs.

  18. Fig.1: Digital Controller with modified buck-boost converter LOAD-INTERACTIVE STEERED-INDUCTOR DC-DC

    E-Print Network [OSTI]

    Prodiæ, Aleksandar

    Fig.1: Digital Controller with modified buck-boost converter LOAD-INTERACTIVE STEERED-INDUCTOR DC-inverting buck- boost. Transient response results show that, compared to standard converters with near-inverting buck-boost converter, i.e. steered-inductor buck-boost, a digital controller, and a communication block

  19. Design Considerations for a Large-Scale Wireless Sensor Network for Substation Monitoring

    E-Print Network [OSTI]

    Nasipuri, Asis

    effective monitoring applications for the substation using low-cost wireless sensor nodes that can sustainDesign Considerations for a Large-Scale Wireless Sensor Network for Substation Monitoring Asis University City Blvd. Charlotte, NC 28223 Luke Van der Zel and Bienvenido Rodriguez Substations Group EPRI

  20. Demo Abstract: Wireless Sensor Network for Substation Monitoring: Design and Deployment

    E-Print Network [OSTI]

    Nasipuri, Asis

    -voltage substations, lower installation cost, and utilization of the distributed pro- cessing capabilities of wirelessDemo Abstract: Wireless Sensor Network for Substation Monitoring: Design and Deployment Asis-Transmissions & Substations 9625 Research Drive Charlotte, NC 28262 {lvanderz,birodriguez} @epri.com Ralph McKosky, Joseph

  1. CEWEP -Confederation of European Waste-to-Energy Plants Boulevard Clovis 12A

    E-Print Network [OSTI]

    Columbia University

    CEWEP - Confederation of European Waste-to- Energy Plants Boulevard Clovis 12A B-1000 Brussels Tel recovery CEWEP welcomes that `energy recovery' should cover the use of waste for generating energy through incineration. That means that Waste-to-Energy (WtE) plants would be considered as performing energy recovery

  2. The Substation of the Future: A Feasibility Study

    E-Print Network [OSTI]

    Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Substation of the Future on challenges facing the electric power industry and educating the next generation of power engineers. More Study" We express our appreciation for the support provided by PSERC's industrial members

  3. Techniques for Securing Substation Automation Systems David Guidry1

    E-Print Network [OSTI]

    Burmester, Mike

    that such systems are properly secured. Most critical infrastructures such as the electricity grid can be modeled be modeled as cyber-physical systems whose cyber components control the underlying physical components so propose techniques for resilient substation automation of power utility systems with security based

  4. Management and Control for Optimal Performance of the Heating Substation 

    E-Print Network [OSTI]

    Yang, J.

    2006-01-01

    With the development of the scale of central heating, a higher managing level is needed for the heating substation. How to economize the more energy is the first factor that managers need to consider while ensuring the comfort of the heating...

  5. Compensated gain control circuit for buck regulator command charge circuit

    DOE Patents [OSTI]

    Barrett, David M. (Albuquerque, NM)

    1996-01-01

    A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit.

  6. Compensated gain control circuit for buck regulator command charge circuit

    DOE Patents [OSTI]

    Barrett, D.M.

    1996-11-05

    A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit. 5 figs.

  7. Substation based data interpretation techniques for improved power system management

    SciTech Connect (OSTI)

    Booth, C.; McDonald, J.R. [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering] [Univ. of Strathclyde, Glasgow (United Kingdom). Centre for Electrical Power Engineering; Laycock, W.J.

    1997-04-01

    There is now considerable pressure on electric utilities to operate their systems in the most efficient manner possible and to provide increased quality of service to customers. This pressure, coupled with the decreasing availability of reserve margins dictates that there is a requirement for comprehensive system operation support through, among other things, the provision of quality information relating to the behavior of the primary and secondary systems. This paper will show how the data available within modern substation control and management systems can be exploited in a cost-effective manner, through the implementation of advanced substation functions in an open systems environment. Certain functions which are presently carried out at the control center could be distributed (or partially distributed) to the substation. These functions may provide the utility staff with quality information, which can in turn be used to satisfy the objectives of increasing quality and security of supply, in addition to optimizing the utility`s information, maintenance and asset management functions.

  8. Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)

    Broader source: Energy.gov [DOE]

    This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

  9. An Integrative Approach to Reliability Analysis of an IEC 61850 Digital Substation 

    E-Print Network [OSTI]

    Zhang, Yan 1988-

    2012-11-28

    the failures at the bay level translate to the substation level, first we describe the Failure Mode and Effect Analysis (FMEA). Subsequently we will describe the reliability model at the substation level using the results of this FMEA. 4.1 Signal Flow... Effects in HV Transformer Bay 4.3 Integration at the Substation Level Now we will use the results of the FMEA to analyze the impact at the substation level. Since IEC 61850 based SAS combines the modern communication and traditional physical...

  10. Sensorless Current Sharing in Digitally Controlled Two-Phase Buck DC-DC Converters

    E-Print Network [OSTI]

    is discussed. Experimental results are shown for a two-phase synchronous buck converter with 6V input voltage synchronous buck converter shown in Fig.1 has been built to test the proposed sensorless current sharing the digital command d. A sensorless current sharing block generates two command duty cycles d1 and d2 in order

  11. 351 Substation Demolition -- B Roll | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-InspiredAtmosphericdevicesPPONeApril351 Substation Demolition -- B Roll 351

  12. Critical Path Method (CPM) Scheduling, Basic Engineering, and Project Approach for Typical Substation Engineering-Procurement-Construction (EPC) Project

    E-Print Network [OSTI]

    Jamir, Dewan R.

    2006-05-19

    design criteria, substation project approach and defines the Client’s, subcontractor’s and Burns & McDonnell’s responsibilities. Burns & McDonnell Engineering specializes and acts as Prime Contractor in the EPC of electrical substations...

  13. Bucks County, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine: EnergyEnergyOhio: Energy ResourcesSilicon BeSiBucks County,

  14. Risk Analysis and Probabilistic Survivability Assessment (RAPSA): An Assessment Approach for Power Substation Hardening1

    E-Print Network [OSTI]

    Krings, Axel W.

    Substation Hardening1 Carol Taylor, Axel Krings and Jim Alves-Foss Computer Science Department University is currently being developed for power industry cyber security assessment and hardening. A substation example is presented, with hypothetical risks and costs from several attack scenarios. Our technique features self

  15. New Solutions for Substation Sensing, Signal Processing and Decision Making M. Kezunovic, Fellow IEEE

    E-Print Network [OSTI]

    New Solutions for Substation Sensing, Signal Processing and Decision Making M. Kezunovic, Fellow describes a new solution for integrating substation sensing, signal processing and decision making for more multiplexed network, distributed signal processing, and neural network based decision making are discussed

  16. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  17. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  18. HEMP-induced transients in electric power substations

    SciTech Connect (OSTI)

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M. (BDM International, Inc., Albuquerque, NM (United States))

    1992-02-01

    A nuclear detonation in or above the earth's atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  19. HEMP-induced transients in electric power substations. Final report

    SciTech Connect (OSTI)

    Wiggins, C.M.; Thomas, D.E.; Salas, T.M. [BDM International, Inc., Albuquerque, NM (United States)

    1992-02-01

    A nuclear detonation in or above the earth`s atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T & D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

  20. More Dakota texts: collections of Alanson Buck Skinner and Amos Oneroad 

    E-Print Network [OSTI]

    Anderson, Laura Lee

    1993-01-01

    The Alanson Buck Skinner Collection of the Braun Research Library at Southwest Museum in Los Angeles contains the ethnology and folktales of Skinner's unpublished monograph on the Eastern Dakota. Skinner and his Wahpeton ...

  1. Improving the control strategy for a four-switch buck-boost converter

    E-Print Network [OSTI]

    Whitaker, Michael Peter

    2007-01-01

    The four-switch buck-boost converter, such as implemented with the Linear Technology LTC3440 integrated circuit, is useful in many applications. While this topology can be highly efficient, new strategies for controlling ...

  2. Electrical substation service-area estimation using Cellular Automata: An initial report

    SciTech Connect (OSTI)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  3. Demonstration Assessment of LED Roadway Lighting: NE Cully Boulevard Portland, OR

    SciTech Connect (OSTI)

    Royer, Michael P.; Poplawski, Michael E.; Tuenge, Jason R.

    2012-06-29

    A new roadway lighting demonstration project was initiated in late 2010, which was planned in conjunction with other upgrades to NE Cully Boulevard, a residential collector road in the northeast area of Portland, OR. With the NE Cully Boulevard project, the Portland Bureau of Transportation hoped to demonstrate different light source technologies and different luminaires side-by-side. This report documents the initial performance of six different newly installed luminaires, including three LED products, one induction product, one ceramic metal halide product, and one high-pressure sodium (HPS) product that represented the baseline solution. It includes reported, calculated, and measured performance; evaluates the economic feasibility of each of the alternative luminaires; and documents user feedback collected from a group of local Illuminating Engineering Society (IES) members that toured the site. This report does not contain any long-term performance evaluations or laboratory measurements of luminaire performance. Although not all of the installed products performed equally, the alternative luminaires generally offered higher efficacy, more appropriate luminous intensity distributions, and favorable color quality when compared to the baseline HPS luminaire. However, some products did not provide sufficient illumination to all areas—vehicular drive lanes, bicycle lanes, and sidewalks—or would likely fail to meet design criteria over the life of the installation due to expected depreciation in lumen output. While the overall performance of the alternative luminaires was generally better than the baseline HPS luminaire, cost remains a significant barrier to widespread adoption. Based on the cost of the small quantity of luminaires purchased for this demonstration, the shortest calculated payback period for one of the alternative luminaire types was 17.3 years. The luminaire prices were notably higher than typical prices for currently available luminaires purchased in larger quantities. At prices that are more typical, the payback would be less than 10 years. In addition to the demonstration luminaires, a networked control system was installed for additional evaluation and demonstration purposes. The capability of control system to measure luminaire input power was explored in this study. A more exhaustive demonstration and evaluation of the control system will be the subject of future GATEWAY report(s).

  4. Efficiency Analysis of a High Frequency Buck Converter for On-Chip Integration with a Dual-VDD Microprocessor

    E-Print Network [OSTI]

    Friedman, Eby G.

    Efficiency Analysis of a High Frequency Buck Converter for On-Chip Integration with a Dual that simultaneously permits monolithic integration and high efficiency. A parasitic model of the buck converter devices on the same die for a target technology. An efficiency of 88.4% at a switching frequency of 477

  5. Hybrid Control Method for Optimal Transient Response and Output Filter Minimization for Buck-Boost type Converters

    E-Print Network [OSTI]

    transfer systems, such as a boost, buck-boost, or flyback converters, this is not the case. Here, the timeHybrid Control Method for Optimal Transient Response and Output Filter Minimization for Buck-Boost type Converters Mor Mordechai Peretz Power Electronics Laboratory Dept. of Electrical and Computer

  6. A BOUNDARY ELEMENT FORMULATION FOR THE COMPUTER DESIGN OF SUBSTATION I. Colominas, F. Navarrina, and M. Casteleiro

    E-Print Network [OSTI]

    Colominas, Ignasi

    A BOUNDARY ELEMENT FORMULATION FOR THE COMPUTER DESIGN OF SUBSTATION GROUNDING I. Colominas, F approach for the numerical com- putation of substation grounding systems is presented. In this general in the BEM formulation to reduce computational cost. While linear and parabolic leakage current elements

  7. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

    1996-08-01

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  8. Regenerative Braking for an Electric Vehicle Using Ultracapacitors and a Buck-Boost Converter

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    Regenerative Braking for an Electric Vehicle Using Ultracapacitors and a Buck-Boost Converter Juan situation (regenerative braking), the battery voltage goes up, and then the control needs to activate regenerative braking can be avoided #12;with the help of ultracapacitors. Besides, ultracapacitors allow

  9. EA-2013: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) and the Bureau of Land Management (BLM) are jointly preparing an EA that analyzes the potential environmental impacts of Western’s proposed use of selected herbicides for the treatment of undesirable vegetation within three existing substations on lands administered by BLM.

  10. Constraint Based Planning with Composable Substate Peter Gregory and Derek Long and Maria Fox

    E-Print Network [OSTI]

    Hammerton, James

    Constraint Based Planning with Composable Substate Graphs Peter Gregory and Derek Long and Maria a constraint-based model for cost-optimal plan- ning that uses global constraints to improve the inference to such problems combine search, inference and relaxation. In cost optimal planning, search and relaxation tech

  11. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  12. Performance Simulations of WLAN and Zigbee in Electricity Substation Impulsive Noise Environments

    E-Print Network [OSTI]

    Atkinson, Robert C

    . The parameters of the impulsive noise model are estimated from data recorded from an electricity transmission The traditional power transmission paradigm is changing. The more efficient, complex, electricity grid is employed to model the electricity transmission substation noise environment. It also explains the process

  13. Effect of zeranol or melengestrol acetate (MGA)on testicular development and aggression in farmed fallow bucks 

    E-Print Network [OSTI]

    Wilson, Timothy Wayne

    2000-01-01

    Fifteen yearling fallow bucks were randomly assigned by body weight to one of three treatment groups: control (C; n=5), melengestrol acetate (MGA; n=5), and zeranol (Z; n=5), to evaluate effects on testicular development, aggressive behavior...

  14. Analysis and Control of Period-Doubling Bifurcation in Buck Converters Using Harmonic Balance

    E-Print Network [OSTI]

    Chung-Chieh Fang; Eyad H. Abed

    2012-10-27

    Period doubling bifurcation in buck converters is studied by using the harmonic balance method. A simple dynamic model of a buck converter in continuous conduction mode under voltage mode or current mode control is derived. This model consists of the feedback connection of a linear system and a nonlinear one. An exact harmonic balance analysis is used to obtain a necessary and sufficient condition for a period doubling bifurcation to occur. If such a bifurcation occurs, the analysis also provides information on its exact location. Using the condition for bifurcation, a feedforward control is designed to eliminate the period doubling bifurcation. This results in a wider range of allowed source voltage, and also in improved line regulation.

  15. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  16. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  17. Adjudication of a Contract for the Construction of a Building for the Electricity Sub-Station of the 300 GeV Accelerator

    E-Print Network [OSTI]

    1973-01-01

    Adjudication of a Contract for the Construction of a Building for the Electricity Sub-Station of the 300 GeV Accelerator

  18. Building Work: Allocation of Contract for the Electric Sub-Station 18 kV, NPA Building, Technological Workshop and Lab. 13

    E-Print Network [OSTI]

    1963-01-01

    Building Work: Allocation of Contract for the Electric Sub-Station 18 kV, NPA Building, Technological Workshop and Lab. 13

  19. 26.2 Single-Inductor Dual-Input Dual-Output Buck-Boost Fuel Cell-Li Ion Charging DC-DC Converter Supply

    E-Print Network [OSTI]

    Rincon-Mora, Gabriel A.

    1 26.2 Single-Inductor Dual-Input Dual-Output Buck-Boost Fuel Cell-Li Ion Charging DC-DC Converter battery with its energy-dense counterpart like the fuel cell (FC) improves micro-scale integration [2]. As a result, buck or boost single-inductor, dual-input, dual-output (SIDIDO) converters enjoy

  20. A three-level buck converter to regulate a high-voltage DC-to-AC inverter

    E-Print Network [OSTI]

    Schrock, Kenneth C

    2008-01-01

    A three-level buck converter is designed and analyzed, and shown to be suitable as a high-voltage down converter as a pre-regulation stage for a 600 watt DC-to-AC power inverter. Topology selection for the inverter is ...

  1. Discrete-Time Poles and Dynamics of Discontinuous Mode Boost and Buck Converters Under Various Control Schemes

    E-Print Network [OSTI]

    Chung-Chieh Fang

    2012-11-19

    Nonlinear systems, such as switching DC-DC boost or buck converters, have rich dynamics. A simple one-dimensional discrete-time model is used to analyze the boost or buck converter in discontinuous conduction mode. Seven different control schemes (open-loop power stage, voltage mode control, current mode control, constant power load, constant current load, constant-on-time control, and boundary conduction mode) are analyzed systematically. The linearized dynamics is obtained simply by taking partial derivatives with respect to dynamic variables. In the discrete-time model, there is only a single pole and no zero. The single closed-loop pole is a linear combination of three terms: the open-loop pole, a term due to the control scheme, and a term due to the non-resistive load. Even with a single pole, the phase response of the discrete-time model can go beyond -90 degrees as in the two-pole average models. In the boost converter with a resistive load under current mode control, adding the compensating ramp has no effect on the pole location. Increasing the ramp slope decreases the DC gain of control-to-output transfer function and increases the audio-susceptibility. Similar analysis is applied to the buck converter with a non-resistive load or variable switching frequency. The derived dynamics agrees closely with the exact switching model and the past research results.

  2. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    SciTech Connect (OSTI)

    Maguire, James; McNamara, Joseph

    2010-06-25

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and safer since it is now a programmed procedure versus the former written procedure that was still subject to human variation in the process.

  3. Jefferson Boulevard OrchardAvenue

    E-Print Network [OSTI]

    Southern California, University of

    24 Hours Scale 0 500 ft Parking Lot B Parking Lot V Parking Lot M Parking Lot 23 Parking Lot SSRI Parking Lot 1 Parking Lot L Parking Structure B Parking Structure X Exposition Parking Structure Parking Structure 1 Parking Center Parking Structure D Summer 2010 Parking Lot 6 Parking Structure A Stever

  4. UNIVERSITY BOULEVARD FAU Research Facility

    E-Print Network [OSTI]

    Marques, Oge

    Harriet L.Wilkes Honors College FAU Research Facility Expansion Satellite Utility Plant Chiller Lift Station SCRIPPS Research Complex LOT 77 LEGEND BLDG. # BUILDING NAME 5353 Parkside Drive, Jupiter, FL

  5. Spadoni Park Circle University Boulevard

    E-Print Network [OSTI]

    Hutchens, John

    ) 16 Science Annex II (under construction) 17 Swain Hall (KESH) (College of Science) 18 Wall Building

  6. Spadoni Park Circle University Boulevard

    E-Print Network [OSTI]

    Hutchens, John

    Hall (KESH) (College of Science) 18 Wall Building (WALL) (Wall College of Business Administration) 19

  7. Spadoni Park Circle University Boulevard

    E-Print Network [OSTI]

    Hutchens, John

    Building (SCI) (College of Science) 16 Science Annex II (under construction) 17 Swain Hall (KESH) (College

  8. Proposal for the award of a contract for the supply and laying of false floors in the rectifier buildings and the electricity sub-stations serving five LEP access points

    E-Print Network [OSTI]

    1986-01-01

    Proposal for the award of a contract for the supply and laying of false floors in the rectifier buildings and the electricity sub-stations serving five LEP access points

  9. Type B Accident Investigation of the Serious Personal Injury while Doble Testing at the Western Area Power Administration Hayden Substation, May 19, 1999

    Broader source: Energy.gov [DOE]

    On May 19, 1999, at 10:31 a.m., four Western Area Power Administration (Western) employees were performing Doble testing on a circuit breaker at Hayden Substation in Routt County, Colorado. Three electricians were injured when the high-voltage lead (HVL) of the Doble test set encroached on the minimum approach distance to an energized part outside clearance boundaries, drawing arcing faults.

  10. A Bidirectional High-Power-Quality Grid Interface With a Novel Bidirectional Noninverted Buck Boost Converter for PHEVs

    SciTech Connect (OSTI)

    Onar, Omer C

    2012-01-01

    Plug-in hybrid electric vehicles (PHEVs) will play a vital role in future sustainable transportation systems due to their potential in terms of energy security, decreased environmental impact, improved fuel economy, and better performance. Moreover, new regulations have been established to improve the collective gas mileage, cut greenhouse gas emissions, and reduce dependence on foreign oil. This paper primarily focuses on two major thrust areas of PHEVs. First, it introduces a grid-friendly bidirectional alternating current/direct current ac/dc dc/ac rectifier/inverter for facilitating vehicle-to-grid (V2G) integration of PHEVs. Second, it presents an integrated bidirectional noninverted buck boost converter that interfaces the energy storage device of the PHEV to the dc link in both grid-connected and driving modes. The proposed bidirectional converter has minimal grid-level disruptions in terms of power factor and total harmonic distortion, with less switching noise. The integrated bidirectional dc/dc converter assists the grid interface converter to track the charge/discharge power of the PHEV battery. In addition, while driving, the dc/dc converter provides a regulated dc link voltage to the motor drive and captures the braking energy during regenerative braking.

  11. Substation Equipment Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect PhotovoltaicsStructureInnovation Portal Substantially Parallel Flux

  12. Center for Transportation Analysis 2360 Cherahala Boulevard

    E-Print Network [OSTI]

    , aviation, schools, drinking water, wastewater, dams, solid waste, hazardous waste, navigable waterways Department of Energy: Infrastructure for Oil Resiliency. Army Corps of Engineers: developed the Ohio River

  13. LOCATION OF SERVICES 496 White Spruce Boulevard

    E-Print Network [OSTI]

    Portman, Douglas

    disorders including anorexia nervosa,· bulimia, or binge eating and obesity Child and adolescent issues

  14. LOCATION OF SERVICES 550 White Spruce Boulevard

    E-Print Network [OSTI]

    Goldman, Steven A.

    disorders including anorexia nervosa,· bulimia, or binge eating and obesity Child and adolescent issues

  15. NATIONAL SCIENCE FOUNDATION 4201 Wilson Boulevard

    E-Print Network [OSTI]

    Collett Jr., Jeffrey L.

    California State University, Sacramento 6000 J Street, Sacramento Hall 0230 Sacramento, CA 95819-6016 (916

  16. PRINCE WILLIAM CAMPUS 10900 University Boulevard

    E-Print Network [OSTI]

    SCIENCES LAB MEC/ SGI MAP KEY Academic and Administrative Buildings Event or Athletic Venues Research Buildings Student Residence Hall Faculty and Staff Parking Disabled Parking Construction Shuttle Bus Stop gettheapp.gmu.edu/ SMART Lab 9438 Innovation Loop #12;

  17. NATIONAL SCIENCE FOUNDATION 4201 Wilson Boulevard

    E-Print Network [OSTI]

    Pasik-Duncan, Bozenna

    Directorate strongly encourages all of its grantees, including grantees from the Small Business Innovative

  18. Development Administration By Alice Buck

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electricLaboratoryof EnergyWASHINGTON, DC -State | Department

  19. SouthMarylandAvenue SouthDrexelBoulevard

    E-Print Network [OSTI]

    He, Chuan

    Shapiro Hall Parking Lot 5700-08 Stony Island Parking Lot ATS Parking International House Parking 5825 Dorchester Parking Cloisters Parking Lot 5721 Kenwood Parking Lot Judd Parking Lot Booth Parking Underground Lot Lexington Parking Lot Parking Lot LASR Parking Lot Young Parking Lot 5482 Greenwood Parking Lot

  20. Northern Boulevard office district : urban design analysis and projections

    E-Print Network [OSTI]

    Rask, Walter S

    1985-01-01

    This thesis takes as its premise the proposition that the pattern of street rights-of-way (and, by implication, utility alignments), blocks and parcelization are together the strongest and most persistent determinants of ...

  1. Riverton-Boulevard Park, Washington: Energy Resources | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onRAPID/Geothermal/Exploration/ColoradoRemsenburg-Speonk, New York:Virginia:Riva,Maryland: Energy

  2. Boulevard Gardens, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-GasIllinois:EnergyIdahoTechnologyEnergy

  3. Supporting Information Conformational Substates of Myoglobin Intermediate

    E-Print Network [OSTI]

    Ihee, Hyotcherl

    , Graduate School of Nanoscience & Technology (WCU), Korea Advanced Institute of Science and Technology buffer (pH 7.0) containing 150-mM NaCl and 1-mM PMSF. The cell debris was removed by centrifugation at 17 at the BioCARS 14-ID-B beamline at the Advanced Photon Source while the storage ring was operated

  4. Line Rebuild, Relocation and Substation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResourcelogo and-E C H2015Tray and|Projects Pages

  5. Bacterial Monitoring for the Buck Creek Watershed 

    E-Print Network [OSTI]

    2008-01-01

    personnel to conduct this study. With the help and cooperation of the Texas AgriLife Research and Extension Center at Vernon, a work plan was developed to collect water samples and conduct water quality monitoring every other week at 13 different sites along...

  6. LAPTAG Plasma Laboratory Manual Richard Buck

    E-Print Network [OSTI]

    Carter, Troy

    , the electrons (due to their low mass and mobility) will surround and shield the potential, thereby preventing it from disrupting the uniformity in the rest of the plasma. The thickness of this shield, called a Plasma: We make a plasma out of an inert gas such as Argon, or Helium. Gas tank gauge (right) and line

  7. Saving Big Bucks with Your Log Sheets 

    E-Print Network [OSTI]

    Puskar, J. R.

    1998-01-01

    of energy cost-related TCA's. This is all about data mining. It's all about finding gold buried in what you thought was waste. This paper can't give you specifics. It can however point you to appropriate TCA concepts. TCA's must be individually tailored to a...

  8. Saving big bucks with your log sheets

    SciTech Connect (OSTI)

    Puskar, J.R. [CEC Consultants, Inc., Cleveland, OH (United States)

    1999-07-01

    This article speaks to a common problem in a lot of industrial and institutional boilerhouses. Most boilerhouses do an excellent job at collecting information. Circular chart recorders churn out pressures, temperatures, and flows for everything from steam to natural gas to city water consumption. At most facilities, this stuff all gets chucked into a drawer or file cabinet daily. Have you ever wondered why you collect and record what you do? What were people thinking when the existing logs were set up? This article attempts to challenge the original thought process and hopes to evoke in the reader a renewed vision of what should be collected, how, and then what can be done with it. The goal of this article is not to define new and expensive data acquisition or control system projects. It is instead to show how to develop systems that only require paper, pencils, and people who are motivated and care. These people are probably already being paid to do most of this work. Experience is that if these people are treated with respect and given some simple tools they will do amazing things beyond what was thought possible. This is a low-tech humanistic approach that has a fabulous rate of return. It`s also something that can be immediately implemented.

  9. Breezy Bucks I | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin:PontiacInformation Forest Service ClimateI Jump to:

  10. Breezy Bucks II | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin:PontiacInformation Forest Service ClimateI Jump to:II Jump

  11. The Atomic Energy Commission By Alice Buck

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyThe U.S.Laclede GasEfficiency MaineAuto industry workers retrain(EAP) Commission By

  12. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  13. Corn Variety Experiments, Substation no. 3, Angleton, Texas. 

    E-Print Network [OSTI]

    Reynolds, E. B. (Elbert Brunner)

    1921-01-01

    1777 1330 1983 1712 Mosby's Prolific. Munson. Oklahoma Yellow Dent. Rockdale. St. Charles White. Sllrcropper. Surcropper. . Surcropper. Surcropper. Tankersley. Thomas. Virginia White Dent. ' Ferguson Yellow Dent. Given's Red Cob.... Golden Dent. . Gorham's Yellow Dent. Hastings' Prolific. Henry Grady. Improved Indian Squaw. Improved Indian +.Squaw. Improved Learning. Mosby's Prolific. Munson. Oklahoma White Wonder. 2444 1713 2425 2435 2424 2445 1777 2420 327...

  14. Report of Experiments at Substation No. 11, Nacogdoches, Texas. 

    E-Print Network [OSTI]

    McNess, George Thomas

    1919-01-01

    Planted Planted Per Acre Mar. 18 April 2 - -- --- The results show good yields from the three thinnest seedings and the best yields from the seeding of 3630 stalks to the acre, or one stalk to one and one-third square yards. 4 The seeding rate... of 4840 stalks per acre, or a stalk to every square yard, gave almost as large yields as the thinner seeding-. The soil on which this test was conducted was only in a fair state of fertility. It is possible, therefore, that the seeding on soils in a...

  15. Detection of Periodic Beacon Loads in Electrical Distribution Substation Data

    SciTech Connect (OSTI)

    Hammerstrom, Donald J.; Guttromson, Ross T.; Lu, Ning; Boyd, Paul A.; Trudnowski, Daniel; Chassin, David P.; Bonebrake, Christopher A.; Shaw, James M.

    2006-05-31

    This research explores methods for identifying a whether a load is sending a signal to the utility SCADA system. Such a system can identify whether various loads are signialing using existing SCADA infrastructure, that is, without added, high cost communications infrastructure.

  16. Design, Simulation, and Analysis of Substation Automation Networks 

    E-Print Network [OSTI]

    Kembanur Natarajan, Elangovan

    2012-07-16

    modern local and wide area communication networks for improving reliability and performance in critical infrastructures. Emerging critical infrastructure applications, such as smart grid, require a certain degree of reliability and Quality of Service (Qo...

  17. Progress Report Substation No. 1, Beeville, Texas, 1910-1914. 

    E-Print Network [OSTI]

    Binford, E.E.

    1917-01-01

    Citrus is an important crop in the Lower Rio Grande Valley, but reduced water supplies in the area mean irrigation must be used. Citrus farmers can use different irrigation methods and practices to get the most from the available water supply....

  18. Progress Report, Substation No. 9, Pecos, Texas, 1910-1914. 

    E-Print Network [OSTI]

    Jackson, J.W.

    1917-01-01

    Texas A&M University's Energy Analysis and Diagnostic Center (EADC) performed 15 energy audits of small- to medium-size manufacturing plants during its first year. The EADC program is funded by the United States ...

  19. Progress Report, Substation No. 2, Troup, Texas, 1901-1914. 

    E-Print Network [OSTI]

    Hotchkiss, W.S.

    1917-01-01

    The Attoyac Bayou watershed is one of many rural watersheds included in the Texas Water Quality Inventory and 303(d) List as an impaired water body due to excessive E. coli levels. In many cases the assessed data in these ...

  20. Cotton Variety Experiments at Substation No. 2, Troup. 

    E-Print Network [OSTI]

    Hotchkiss, W. S.; Johnson, P. R. (Paul Rufus)

    1930-01-01

    . CLARK, B. S., ~ntom3, W. J. BACH, M. S., Plant Pathologisl No. 16, Iowa Park, Wichita County: E. J. WILSON, B. S., Superintender 'in9 Cooperative Projects on the Stat A. K. MACKEY, M. S., Animal Husb J S MOGFORD M S. Agronomy F'. < JAMISON, 'M. s...

  1. Cotton Variety Experiments: Substation No. 3, Angleton, Texas 

    E-Print Network [OSTI]

    Reynolds, E. B. (Elbert Brunner)

    1921-01-01

    45.47 39.06 42.51 40.17 39.28 42.02 39.00 37.05 42.30 37.79 Acre Yield, Pounds L~nt 366 586 571 416 468 435 446 461 577 434 Acre Yield, Pounds L~nt 438 357 345 29 1 327 29 1 283 . 268 3 74 280 Length of Staple....92 845.91 840.77 826.02 753.37 743.33 728.59 690.96 - 647.06 569.65 Acre Yield Pounds ~e;d 1368.69 1399.44 1397.72 1582.09 1313.21 1357.66 1177.00 1446.72 1305.70 1080.08 relatively low yields of lint, as compared to the yields...

  2. Report of Experiments at Substation No. 4, Beaumont, Texas. 

    E-Print Network [OSTI]

    Laude, H. H. (Hilmer Henry)

    1919-01-01

    less. ---L-L--- ies are .aonnrl +l bonuinons on nuusranon LAO. 4 are especlauy sumule fo;the stud? of rice-f arm problems. Cottonseed meal produced the most rice, but a. light application of ammonium sulphate and acid phosphate combined, or a...

  3. Proposed Transmission Towers Proposed New Substation Sites Proposed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    represent any legal information or boundaries. Sources: BPA 2012, Clark 2011d, Cowlitz GIS 2011b and Metro 2011b. LEGEND Recreation Type Greenway Park Dispersed Recreational Area...

  4. Sweet Potato Fertilizer Experiments at Substation No. 2, Troup. 

    E-Print Network [OSTI]

    Hotchkiss, W. S.

    1921-01-01

    . S ." - .- .d 3 %" +J a gP U $ 3.89 5.74 2.25 6.00 4.93 - 5.75 9.14 7.59 A -- s 0 d 2-2 " a,. z'," c* o a.5 225 ;:CU f3 ........ 50.4 43.2 3.4 72.0 41.9 - 54.6 57.9 70.8' oa Ow* '. ka' #g,. i zg:: gb ................ $ 37..., in 1907, 1908, and 11, was 17.?'0, 28.66, and 10.74 inches, respectively. The soils on which these experiments were conducted are classed by 3 Bureau of Soils as Susquehanna fine sandy loam. This soil is tyish in color with a red plastic clay subsoil...

  5. IEEE aims to improve seismic design of power substations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineer to defined needs and conditions. And there's a huge benefit to the public. "The seismic qualification process is far more efficient and costs are distributed...

  6. A complete and normalized 61850 substation (Smart Grid Project) | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavyAgencyTendo NewYanbu,Information on Worldwide

  7. EA-2013: Herbicide Application at Three Substations; Imperial County

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|Department of Energy 8:Final78: SandDepartment

  8. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatement |to ConductLarimer County, Colorado | Department of

  9. Microsoft Word - Tacoma-Raver-Substation-Antenna-CX.doc

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPAEnergy May2.docTechnicalBARACK07 AnnualGovernment Department

  10. Variable Voltage Substation Electric Fire and Emergency Response |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutoryin theNuclearEnergyVBA-0082 - In|955Department

  11. Benefits of Using Mobile Transformers and Mobile Substations for Rapidly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12Power, Inc |BartlesvilleRestoring Electrical Service: a Report to

  12. CEWEP -Confederation of European Waste-to-Energy Plants Boulevard Clovis 12A

    E-Print Network [OSTI]

    processing is already a significant source of renewable energy in many countries and there is major potential Recovered Fuel) as a fuel in both cement kilns and power plants, dedicated Biomass Energy Plants (BEP . We estimate that about 95 TWh of this gap could potentially be provided by Energy from Waste (using

  13. CEWEP -Confederation of European Waste-to-Energy Plants Boulevard Clovis 12A

    E-Print Network [OSTI]

    Columbia University

    energy from waste Waste-to-Energy A cost effective and reliable sustainable energy source Waste waste represent a relatively low cost source of sustainable energy. The EU 27's renewable energy gap demand per capita equals 1.62 MWh/capita/yr and heat demand per capita equals 5.03 MWh/capita/yr. #12

  14. Human Resources Payroll and Employee Benefits Office 108 Pearman Boulevard at Old Stadium Road

    E-Print Network [OSTI]

    Stuart, Steven J.

    Clemson, SC 29631 Atlanta, GA 30328-6104 864-654-5556 800-842-2003 X3524 800-755-7649 www.tiaa-cref.org/scorp 29670 864-654-3121 864-261-9674 Plan #: SCORP CU 1013145-01 For additional information or assistance

  15. City of Davis City Manager's Office 23 Russell Boulevard, Suite 1 Davis, California 95616

    E-Print Network [OSTI]

    Pasternack, Gregory B.

    September 17, 2014 The portion of the Putah Creek Parkway Bike Path between West Olive Drive and the tunnel of GATEways Horticulture, UC Davis Arboretum and Public Garden, ebgriswold@ucdavis.edu (530) 754-8038 Anne

  16. Evaluation of traits associated with bucking bull performance and behavior 

    E-Print Network [OSTI]

    Romero, Natasha Elizabeth

    2009-05-15

    Video and industry data were used to assess the inter-relationships of aggression, delivery, coat color, year of birth, number of outs, buckoff percent and score in rodeo bulls. An evaluation of laterality based on observations of how the individual...

  17. Big bucks not always needed for new business

    SciTech Connect (OSTI)

    Madison, Alison L.

    2011-07-10

    Monthly Economic Diversity column for Tri-City Herald (first 2 paragraphs pasted below): I think many of us at one time or another has at least wondered what self-employment would be like. Amidst romantic visions about easygoing schedules and the reduced pressure of not having to answer to someone else, the daydreaming eventually gives way to reality. What would my value proposition be? Where would I start? And would that secret trust fund indeed be revealed to me at the right moment to make it possible? Since for most of us that last question is little more than a pipe dream, the money dilemma is top of mind when it comes to the proposition of starting a business from scratch. But it doesn't have to dig to the bottom of your wallet or your net worth as was recently affirmed in a great Wall Street Journal article about starting successful companies on a shoestring budget.

  18. BUCKS COUNTY DEPARTMENT OF HEALTH RULES AND REGULATIONS

    E-Print Network [OSTI]

    with drilling tools; treating a well to increase yield; altering the physical structure or depth of the well, such as the space between a drill hole and a casing pipe and a liner pipe. ANSI - American National Standards fluids and prevent them from entering the well. Coliform - All of the aerobic and facultative anaerobic

  19. Burbank Water & Power - Business Bucks Energy Efficiency Grant Program |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l DeInsulation at the EdgeBUILDINGS-TO-GRIDDepartment of Energy

  20. University of California Davis Medical Center, Employee Health Services 2221 Stockton Boulevard, Cypress Building Suite A, Sacramento, CA 95817

    E-Print Network [OSTI]

    Leistikow, Bruce N.

    , Cypress Building Suite A, Sacramento, CA 95817 916-734-3572 Fax 916-734-7510 FLU CONSENT - INACTIVATED

  1. University of California Davis Medical Center, Employee Health Services 2221 Stockton Boulevard, Cypress Building Suite A, Sacramento, CA 95817

    E-Print Network [OSTI]

    Leistikow, Bruce N.

    , Cypress Building Suite A, Sacramento, CA 95817 916-734-3572 Fax 916-734-7510 Influenza Vaccine Declination

  2. Alexia Anastasia Sabor_____________________________________________________________________________________________________________________ 305 N. Midvale Boulevard Madison, WI 53705 (608) 692-8272 alexia.sabor@gmail.com

    E-Print Network [OSTI]

    Turner, Monica G.

    Conference, attended by approximately 300 participants annually. Market Research Consultant. April-May 2007. Assisted in the design and implementation of a survey to assess public opinion about environmental issues Service and the U.S. Decennial Census. Results from change analysis being used to create scenarios

  3. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    1991-05-03

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  4. Synchrophasor Measurement Using Substation Intelligent Electronic Devices: Algorithms and Test Methodology 

    E-Print Network [OSTI]

    Ren, Jinfeng

    2012-02-14

    Digital Fault Recorder DFT Digital Fourier Transform DPR Digital Protective Relaying GPS Global Positioning System IED Intelligent Electronic Device IRIG-B Inter Range Instrumentation Group Time Code Format B NIST National... ................................................................ 31 ix Page 2.4.1 Real-time Operations ...................................................................... 33 2.4.2 Off-line Applications ...................................................................... 39 2.4.3 Wide-area Controls...

  5. Report of Progress with Citrus Fruits at the Beeville Sub-Station, Bee County. 

    E-Print Network [OSTI]

    Waschka, S. A.

    1909-01-01

    in an orchard, and great care should be exercised in buying stock. As a treatment for these scales, we have found Whale Oil Soap Ve*y effective? one pound of the soap to two gallons of water; prepared to make a proper emulsion. H. II. HARRINGTON, Director. ...

  6. Cotton Variety Experiments, 1912-1920, Substation No. 7, Spur, Texas. 

    E-Print Network [OSTI]

    Freeman, George Fouche; Dickson, R. E

    1922-01-01

    . S. No. Variety 11. ...................... .Lone Star. 14. ...................... .Unknown Long Staple. 1.18.. ..................... .Long Staple. 128. ...................... .Mebane Triumph. 169 ........................ Webber. 411.... S. No. Variety ........................ 413 Snowflake. 414 ...................... :.Durango. ...................... 443. .Half and Half. ....................... 446. Simpkin's Prolific. ........................ 466 Webber. 469...

  7. Progress Report of Substation No. 3, Angleton, Texas, 1909-1914. 

    E-Print Network [OSTI]

    Winters, N. E. (Nathaniel Elmer)

    1916-01-01

    review paper by Bystricky, Lehar, and Winternitz [14]. A. Spin direction (ILLS + ICSL)/(I'LL ?I&ss) = tan Ol b TABLE I. Sign convention and notation. This paper Ags ~LL ~ss ~SL Amdt AT APT RT RPT Bystricky ?&o xo +~oa~o +~oaso ? ~o....059+0.038 0.006+0.031 -0.065+0.039 -0.009+0.036 -0.064+0.034 -0.037+0.042 -0.082+0.039 -0.121+0.035 -0.090+0.038 -0.109+0.036 -0.160+0.031 -0.042+0.039 -0,196+0.041 -0.166+0.052 -0.136+0.033 -0.197+0.066 -0.099+0.046 -0.134+0.062 0...

  8. Report on Experiments with Citrus Fruits at the Beeville Sub-station

    E-Print Network [OSTI]

    Potts, A. T. (Arthur Tillman)

    1912-01-01

    In 1968 and 1969, moisture level treatments were applied to tomatoes and citrus. Light sprinkler applications and white acrylic paint were applied to leaf canopies of tomatoes and citrus. Moisture use and yields as influenced by treatments were...

  9. Irish Potatoes: Results of Experiments at Troupe Sub-station, Smith County. 

    E-Print Network [OSTI]

    Green, Edward C.

    1904-01-01

    considerably by rot, and had to replant. The absence of rot in the Station field was probably due to the previous treatment of the seed. The potatoes had been cut to two-eye pieces, sprinkled with fine air-slaked lime, and exposed to sun and air for several... days before planting. They were turned over each day and an occasional sifting of air-slaked lime given them. As a result of this treatment the cut surfaces were dry and well cured before planting. All plats were cultivated an equal number of times...

  10. A methodology for performance and compatibility evaluation of an all-digital substation protection system 

    E-Print Network [OSTI]

    Portillo Urdaneta, Levi

    2007-04-25

    A power system protection system consists, at least, of an instrument trans- former, a protective device (relay), and a circuit breaker. Conventional instrument transformers bring currents and voltages from power network levels to much lower scaled...

  11. ELECTRICAL SUBSTATION RELIABILITY EVALUATION WITH EMPHASIS ON EVOLVING INTERDEPENDENCE ON COMMUNICATION INFRASTRUCTURE.

    SciTech Connect (OSTI)

    AZARM,M.A.BARI,R.A.MUSICKI,Z.

    2004-01-15

    The objective of this study is to develop a methodology for a probabilistic assessment of the reliability and security of electrical energy distribution networks. This includes consideration of the future grid system, which will rely heavily on the existing digitally based communication infrastructure for monitoring and protection. Another important objective of this study is to provide information and insights from this research to Consolidated Edison Company (Con Edison) that could be useful in the design of the new network segment to be installed in the area of the World Trade Center in lower Manhattan. Our method is microscopic in nature and relies heavily on the specific design of the portion of the grid being analyzed. It extensively models the types of faults that a grid could potentially experience, the response of the grid, and the specific design of the protection schemes. We demonstrate that the existing technology can be extended and applied to the electrical grid and to the supporting communication network. A small subsection of a hypothetical grid based on the existing New York City electrical grid system of Con Edison is used to demonstrate the methods. Sensitivity studies show that in the current design the frequency for the loss of the main station is sensitive to the communication network reliability. The reliability of the communication network could become a more important contributor to the electrical grid reliability as the utilization of the communication network significantly increases in the near future to support ''smart'' transmission and/or distributed generation. The identification of potential failure modes and their likelihood can support decisions on potential modifications to the network including hardware, monitoring instrumentation, and protection systems.

  12. Vulnerability of Zigbee to Impulsive Noise in Electricity Substations S A Bhatti1

    E-Print Network [OSTI]

    Atkinson, Robert C

    HART is a standard that defines a protocol stack that can employ any short range wireless technologies in terms of WSN standardization. The HART Communication Foundation and International Society of Automation sectors have recently adopted Wireless HART. Its use in electricity supply industry, however, is limited

  13. Energy Conservation Program of the Division of Substation and Control Engineering : An Interim Report.

    SciTech Connect (OSTI)

    ,

    1981-04-01

    Energy conservation projects undertaken by BPA that could benefit residential and commercial users and development of prototype equipment are described. Progress reports are presented and directions that the projects will take are indicated. The first projects presented are those being done at BPA's Midway Residential Community: studies on air infiltration and weatherization, and evaluation of such energy conservation measures as heat pump and solar water heaters. The next section involves an energy audit and retrofit program undertaken to reduce energy consumption in BPA's own buildings. The third section, also concerned with BPA's efforts to reduce internal energy consumption, presents the application of passive solar techniques to the design of new BPA buildings. The fourth section reports on a system developed to utilize waste thermal energy from transformers and solar energy for space heating and cooling. The fifth section also involves the development of a prototype system, one to monitor energy usage of industrial equipment. The final sections report on projects involving solar and wind energy, the Photovoltaic Applications Program, and the Mod-2 Wind Generator project at Goodnoe Hills. (MCW)

  14. Screening Level Characterization of Electrical Substation 411. DOE/OR/21548-154.

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700 GJO-2003-411-TACe: SUBJIHX:ontine at

  15. Ubiquitous Growth of Paleoarchean Biofilms Recorded in White Chert Bands of the Buck Reef Chert 

    E-Print Network [OSTI]

    Sneed, Jonathan

    2014-12-11

    ministromatolites with radial-fibrous fabric." Sedimentology 34(6): 963-971. Riding, R. (2011), “Microbialites, stromatolites, and thrombolites.” Encyclopedia of Geobiology, Springer: 635-654. Schopf, J. W. (1993). "Microfossils of the Early Archean Apex... Chert: New evidence of the antiquity of life." Science 260(5108): 640-646. 22 Simonson, B. M., et al. (1993). "Carbonate sedimentology of the early Precambrian Hamersley Group of western Australia." Precambrian Research 60(1): 287- 335...

  16. Induction logging device with a pair of mutually perpendicular bucking coils

    DOE Patents [OSTI]

    Koelle, Alfred R. (Los Alamos, NM); Landt, Jeremy A. (Los Alamos, NM)

    1981-01-01

    An instrument is disclosed for mapping vertical conductive fractures in a resistive bedrock, magnetically inducing eddy currents by a pair of vertically oriented, mutually perpendicular, coplanar coils. The eddy currents drive magnetic fields which are picked up by a second, similar pair of coils.

  17. Best bang for your buck: GPU nodes for GROMACS biomolecular simulations

    E-Print Network [OSTI]

    Kutzner, Carsten; Fechner, Martin; Esztermann, Ansgar; de Groot, Bert L; Grubmüller, Helmut

    2015-01-01

    The molecular dynamics simulation package GROMACS runs efficiently on a wide variety of hardware from commodity workstations to high performance computing clusters. Hardware features are well exploited with a combination of SIMD, multi-threading, and MPI-based SPMD/MPMD parallelism, while GPUs can be used as accelerators to compute interactions offloaded from the CPU. Here we evaluate which hardware produces trajectories with GROMACS 4.6 or 5.0 in the most economical way. We have assembled and benchmarked compute nodes with various CPU/GPU combinations to identify optimal compositions in terms of raw trajectory production rate, performance-to-price ratio, energy efficiency, and several other criteria. Though hardware prices are naturally subject to trends and fluctuations, general tendencies are clearly visible. Adding any type of GPU significantly boosts a node's simulation performance. For inexpensive consumer-class GPUs this improvement equally reflects in the performance-to-price ratio. Although memory is...

  18. Distributed Rendering for Scalable Displays Greg Humphreys Ian Buck Matthew Eldridge Pat Hanrahan

    E-Print Network [OSTI]

    Stanford University

    such as the PowerWall [12] and CAVE [4] support resolutions well beyond the common desktop but are limited

  19. An exploratory design of a 65 nm CMOS buck converter for maximum efficiency

    E-Print Network [OSTI]

    Lin, Doris, M. Eng. Massachusetts Institute of Technology

    2008-01-01

    Portable battery-operated consumer devices, such as mp3 players, cell phones, and digital cameras, are becoming ever more prevalent and so the need for long battery life is increasingly important. These small devices contain ...

  20. A Dual-Supply Buck Converter with Improved Light-Load Efficiency 

    E-Print Network [OSTI]

    Zhang, Chao

    2012-07-16

    Power consumption and device size have been placed at the primary concerns for battery-operated portable applications. Switching converters gain popularity in powering portable devices due to their high efficiency, compact sizes and high current...

  1. Single Event Upset Energy Dependence In a Buck-Converter Power Supply Design

    E-Print Network [OSTI]

    Drake, G; The ATLAS collaboration; Gopalakrishnan, A; Mahadik, S; Mellado, B; Proudfoot, J; Reed, R; Senthilkumaran, A; Stanek, R

    2012-01-01

    We present a study of Single Event Upsets (SEU) performed on a commercial pulse-width modulator controller chip for switching power supplies. We performed tests to study the probability of an SEU occurring as a function of incident particle (hadron) energy. We discuss the performance of the circuit, and present a solution using external circuitry to effectively eliminate the effect.

  2. New Orleans Urbanized Area Metropolitan Transportation Plan FY 2032 

    E-Print Network [OSTI]

    New Orleans Urbanized Area Regional Planning Commission

    2007-06-12

    Road Corridor---------------------------------------------------------------------------------- 52 Earhart Corridor--------------------------------------------------------------------------------------- 53 Causeway Boulevard Widening...

  3. System Stability through technology Smart Grid Design Goals

    E-Print Network [OSTI]

    Central Services (Data Center) HistorianDMS A&V Substation Devices PDC AVVC Gateway PMU Substation 2 Substation Devices IED AVVC PMU Substation n Substation Devices Substation 3 Substation Devices ESC ESCESC ESC Represents a device with CCS capabilities AVVC IED IED AVVC PMU IED IED PMUGateway EPS

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    operating costs, and substation costs for substations thatsubstation, and are derived from a simple levelized-cost-of-above) transmission substation. Capital costs vary for the

  5. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    alternative includes the Casey Road substation site. As compared to the Baxter Road substation site, the Casey Road substation site avoids significant steep, rocky terrain,...

  6. IRD Sige, 44, boulevard de Dunkerque, 13572 Marseille cedex 02 L'IRD et l'AFD signent un accord-cadre de partenariat pour unir leurs

    E-Print Network [OSTI]

    efficiente et optimisée au bénéfice des pays du Sud ». Pour Dov Zerah, Directeur général de l'AFD, « cet

  7. Maison des Sciences conomiques, 106-112 boulevard de L'Hpital, 75647 Paris Cedex 13 http://mse.univ-paris1.fr/Publicat.htm

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    SCHUBERT 2006.40 halshs-00115685,version1-22Nov2006 #12;The optimal carbon sequestration in agricultural particulier la séquestration de carbone dans les sols. Les travaux existants qui étudient la sequestration sequestration in agricultural soils. Existing papers studying the optimal carbon sequestration recognize

  8. Maison des Sciences conomiques, 106-112 boulevard de L'Hpital, 75647 Paris Cedex 13 http://mse.univ-paris1.fr/Publicat.htm

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    'existence d'une courbe de Kuznets entre les normes et les inégalités de revenu pour 90 pays sur la période interpréter la courbe de Kuznets. Mots clefs : Normes fondamentales du travail, Inégalités, Courbe de Kuznets to effectively put in place labour standards. We then find a Kuznet curb between standards and income

  9. Maison des Sciences conomiques, 106-112 boulevard de L'Hpital, 75647 Paris Cedex 13 http://mse.univ-paris1.fr/Publicat.htm

    E-Print Network [OSTI]

    Boyer, Edmond

    at marginal cost. Formally, firms are supposed to minimize their costs and set their selling prices equal with the existence of marginal pricing equilibria or equilibria with general pricing rules in an economy. Furthermore, the free-disposal assumption is weaken, which allows to consider non positive prices. Finally, we

  10. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    TRANSMISSION AND DISTRIBUTION POWER SUBSTATIONS CAPITALIZED COST CALCULATION METHODS PLANNING COST ESTIMATION MATHEMATICAL MODELS The displacement or deferral of substation...

  11. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS",,"The displacement or deferral of substation...

  12. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    line cost and substation costs. The resulting broad range inthe cost of all associated equipment such as substations,

  13. Field Experiments at McKinney Sub-Station and Wichita Falls Sub-Station with Wheat, Corn, Cotton, Grasses and Manures. Field Experiments at College Station with Corn, Cotton, Grasses, Peas and Manures. 

    E-Print Network [OSTI]

    Connell, J. H.; Clayton, James

    1895-01-01

    Cracken . . ............................... Smooth . . . . . . . . 17 .18 ..... . 206 White Frack .................................. do ......... Hi.29 .... .. 207 Lebanon ................................... Bearded ........ 23.55 3.43. 208 Bodine E., 0. K. West .... . ................. Smooth...

  14. The design, implementation and testing of data gathering instrumentation for measurement of electromagnetic interference in electric power substations 

    E-Print Network [OSTI]

    Gerloff, Gary Wayne

    1983-01-01

    by direct digitization. The R7912 and support hardware produced digitized data in a for- mat compatible with the available analysis computer. The data could be taken from the R7912 processed by host computer and stored on hard disl?vithout introducing...

  15. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  16. Retraction of the mobile descended larynx during groaning enables fallow bucks (Dama dama) to lower their formant

    E-Print Network [OSTI]

    Obbard, Darren

    -thyroid and sterno-hyoid muscles. This increases the vocal tract length (VTL) and results in lower formant-product of upright posture or it could be adaptive for mouth breathing during extreme physical challenge (Dubrul

  17. What'swrongwithUNESCO The new director-general needs to buck all expectations and transform the agency.

    E-Print Network [OSTI]

    Horton, Tom

    on renewable energy. UNESCO has strengths to build on. Its water programme is large and flabby, but outside made a start along those lines. Its advice to Nigeria on building a science system is credited

  18. Near Time-Optimal Transient Response in DC-DC Buck Converters Taking into Account the Inductor Current Limit

    E-Print Network [OSTI]

    for the controller design. Furthermore, the minimum number of switching actions required to handle a generic current Current Limit Amir Babazadeh, Luca Corradini, and Dragan Maksimovi Colorado Power Electronics Center ECEE of design equations is developed which provide the engineer with the necessary analytical tools

  19. Getting the Biggest Bang for the Buck: Exploring the Rationales and Design Options for Energy Efficiency Financing Programs

    Broader source: Energy.gov [DOE]

    Many state policymakers and utility regulators have established aggressive energy efficiency (EE) savings targets which will necessitate investing billions of dollars . Given this challenge, some EE program administrators are exploring ways to increase their reliance on financing with the aim of amplifying the impact of limited program monies. While financing is potentially an attractive tool, administrators can face difficult choices between allocating funds to financing or to other approaches designed to overcome a broader set of barriers to consumer investment in EE. Robust assessments of financing's role in reducing energy use in buildings are necessary to help policymakers and program administrators make better choices about how to allocate limited resources to achieve cost effective energy savings at scale.

  20. An analysis of techniques implementing virtual load line voltage sense and regulation for automotive USB buck application

    E-Print Network [OSTI]

    Koether, Ethan (Ethan M.)

    2014-01-01

    This thesis analyzes three diseparate methods of virtual voltage sense in order to achieve voltage regulation at the end of load line cables without the need for two sense cables. This thesis also explores the implementation ...

  1. Towards Automated System Synthesis Using SCIDUCTION

    E-Print Network [OSTI]

    Jha, Susmit Kumar

    2011-01-01

    DC-DC Buck-Boost Converter . . . . . . . . . . . 7.3.4 Airii) a DC-DC Buck-Boost Converter, motivated by the problem7.3.3 DC-DC Buck-Boost Converter In this case study, we

  2. Power Control and Optimization of Photovoltaic and Wind Energy Conversion Systems /

    E-Print Network [OSTI]

    Ghaffari, Azad

    2013-01-01

    3.4.2 DC/DC Boost Converter . . . . . 3.5losses in buck and boost converters. . . . . . . . . . . . .buck and boost converters. . . . . . . . . . . . Table 4.1:

  3. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Burbank Water & Power- Business Bucks Energy Efficiency Grant Program Burbank Water and Power (BWP) offers the Business Bucks Grant Program to its small and mid-sized business...

  4. Preprint of the paper "A General Formulation based on the Boundary Element Method for the Analysis

    E-Print Network [OSTI]

    Colominas, Ignasi

    cost) to the analysis of large grounding systems in electrical substations. In this paper we present a new Boundary Element formulation for substation grounding systems embedded in layered soils of the substation site. Obviously, from a technical (and

  5. FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH

    E-Print Network [OSTI]

    Lesieutre, Bernard

    2013-01-01

    communications in the substation Example Costs: Instrument115-kV “B” Substations SVC Unit Cost ($ Millions) Total115-kV “B” Substations SVC Unit Cost ($ Millions) Total SVC

  6. Approaches To Integrating A HIgh Penertration Of Solar PV and CPV Onto The Electrical Grid

    E-Print Network [OSTI]

    Hill, Steven Craig

    2013-01-01

    of way costs per acre. Substation costs also vary with size.the transmission and substation costs to produce a realisticRight of Way Cost Substation Cost AFUDC/ Overhead Cost Total

  7. Environmental Life-cycle Assessment of Passenger Transportation: A Detailed Methodology for Energy, Greenhouse Gas and Criteria Pollutant Inventories of Automobiles, Buses, Light Rail, Heavy Rail and Air v.2

    E-Print Network [OSTI]

    Chester, Mikhail; Horvath, Arpad

    2008-01-01

    $74,000 per mile. Total substations cost for the Muni systempower structure and substations construction costs have beenStructure ($M 1997 ) Cost of Substations ($M 1997 ) Caltrain

  8. Life-cycle Environmental Inventory of Passenger Transportation in the United States

    E-Print Network [OSTI]

    Chester, Mikhail V

    2008-01-01

    74,000 per mile.   Total  substations  cost  for  the  Muni structure  and  substations  construction  costs  have Structures ($M 1997 )  Cost of Substations ($M 1997 )  BART 

  9. Environmental Life-cycle Assessment of Passenger Transportation: A Detailed Methodology for Energy, Greenhouse Gas and Criteria Pollutant Inventories of Automobiles, Buses, Light Rail, Heavy Rail and Air

    E-Print Network [OSTI]

    Chester, Mikhail; Horvath, Arpad

    2007-01-01

    $74,000 per mile. Total substations cost for the Muni systempower structure and substations construction costs have beenStructure ($M 1997 ) Cost of Substations ($M 1997 ) Caltrain

  10. Abstract-This paper will introduce the two basic switching cells, P-cell and N-cell, and their applications in different power

    E-Print Network [OSTI]

    Tolbert, Leon M.

    such as buck, boost, buck-boost, and Cúk converters are used in various applications. However, these circuits are functionally the same. Thus, using these three combinations, the buck, boost, and buck-boost converter can method to construct several dc-dc converters from these basic switching cells. Moreover, considering

  11. Supervisory Electrical Engineer

    Broader source: Energy.gov [DOE]

    This position is located in Substation Maintenance and High Voltage Engineering (TESM) of Substation Engineering (TES), Engineering and Technical Services (TE), Transmission Services (T),...

  12. Review of Site Preparedness for Severe Natural Phenomena Events...

    Office of Environmental Management (EM)

    substations at the facilities, which reduce power to various AC voltages providing a dual loop power supply. In Idaho Falls, separate substations provide commercial power at...

  13. BPA, Transmission, I-5 Corridor Reinforcement Project, August...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    near Castle Rock, Cowlitz County, Washington, to a new substation near BPA's Troutdale Substation, Troutdale, Multnomah County, Oregon (see enclosed map). Background BPA is a...

  14. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    substation, and are derived from a simple levelized-cost-substation, the capacity factor of the renewable resource, and financing parameters—including the capital structure, cost

  15. Microsoft PowerPoint - MACRUC Smart Grid School_rev 2A_NETL.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    enables "Self Healing" 33 33 g Advanced Transmission Solutions * Wide Area Measurement System (WAMS) * Substation Automation Substation Automation * Advanced regional operating...

  16. Microsoft Word - Whitepaper_Building A Smart Grid Business Case...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information and control capabilities at each substation and communicates with other Building a Smart Grid Business Case 24 substations to ensure that broader system...

  17. U.S. Offshore Wind Manufacturing and Supply Chain Development

    Energy Savers [EERE]

    minimize array cabling needs. Modular substations could push down the labor intensity of building and installing offshore substations while self-elevating stations could bring...

  18. Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement

    SciTech Connect (OSTI)

    VanBaalen, R.A.

    1995-02-01

    This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

  19. Type B Accident Investigation Board Report of the January 20, 1998, Electrical Accident at the Casa Grande Substation,South of Phoenix, Arizona

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type-B Accident Investigation Board appointed by Michael S.Cowan, Chief Program Officer, Western Area Power Administration.

  20. College Grads, Young Moms, Big Bucks, State Reps and Racial Composition: Evaluating the Impact of Social, Political and Economic Factors on State-Level Head Start Uptake Rates 

    E-Print Network [OSTI]

    Allison, Angela N

    2013-04-11

    The Head Start Program aims to equip pre-school age children from low-income families with the social, academic and emotional development that is essential upon entry to Kindergarten. While much research and debate exists about whether or not Head...

  1. Uranium Analysis with X-ray Microscopy Research Team: Andrew Duffin, Jesse Ward, Gregory Eiden, Steven Smith, Bruce McNamara, Edgar Buck

    E-Print Network [OSTI]

    classification of uranyl compounds via oxygen K-edge NEXAFS Excellent fit of calculated spectra to experiment will lead to identification of states responsible for the spectral features Developed method for uranyl library Request for follow-on funding submitted to National Nuclear Security Administration Uranyl

  2. IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--I: FUNDAMENTAL THEORY AND APPLICATIONS, VOL. 45, NO. 7, JULY 1998 707 BorderCollision Bifurcations in the Buck Converter

    E-Print Network [OSTI]

    Maryland at College Park, University of

    IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--I: FUNDAMENTAL THEORY AND APPLICATIONS, VOL. 45, NO. 7 the construction of a normal form is applied. This method applies to many power electronic circuits as well, 1997. This work was supported by the Department of Energy (Mathematical, Information, and Computational

  3. Design, Construction and Performance of a Buck-Boost Converter for an Ultracapacitor-Based Auxiliary Energy System for Electric Vehicles

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    energy systems (gas turbines, fuel cells, etc) with lower power ratings, similar to the mean power a serial connection of a generic hybrid vehicle, often used in vehicles running on fuel cells or Zinc energy density of gas or hydrogen and high efficiency of electric drive systems [1]. Still, gas

  4. A review of "Women, Property, and the Letters of the Law in Early Modern England." by Nancy E. Wright Margaret Ferguson A. R. Buck eds. 

    E-Print Network [OSTI]

    Nancy M. Bunker

    2005-01-01

    for manuscript and printed texts? (232). Thomas S. Freeman turns attention to the Marian Protestants, who tended to rely ?more heavily on the written than the printed words as a means of communicating with their followers? (235). This leads to a careful... examination of the conditions of incarceration, for ?a Marian prison was only as secure as its gaolers? (239). Ann Hughes contributes to our under- standing of Thomas Edwards?s Gangraena (1646), seen as an exemplar of the power of print in mid...

  5. Who Gets Public Goods? Using Satellite Imagery to Measure the Distribution of Rural Electrification

    E-Print Network [OSTI]

    Min, Brian

    2007-01-01

    cost investments in infrastructure including new power plants, long haul transmission lines, substations, and

  6. Electrolysis-Utility Integration Workshop September 22, 2004

    E-Print Network [OSTI]

    " Distribution substations ! Each locations has different issues " Operational " Cost " Distribution (of H2Siting and Location ! Electrolysis systems can be sited at " Existing generating stations " Transmission substations($/MWh) Baseload Intermediate Peaking #12;Transmission Substation SiteTransmission Substation Site ! Offers same

  7. Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions

    E-Print Network [OSTI]

    Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

    2007-01-01

    cost of service differentials, maintenance of the extensive and lightly-loaded network, and overloaded substations

  8. TATA INSTITUTE OF FUNDAMENTAL RESEARCH TIFR Center for Interdisciplinary Sciences

    E-Print Network [OSTI]

    Shyamasundar, R.K.

    , operations and maintenance of Sub-station, transformer, switchgear, HT / LT panels, cabling. etc. Job

  9. EA-1110: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Use of Herbicide for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards

  10. The early planning and development of Oklahoma City

    E-Print Network [OSTI]

    Humphreys, Blair D. (Blair David)

    2009-01-01

    An analysis of the planning, development, and implementation of Oklahoma City's Grand Boulevard. In the early days of 1909, a plan emerged to build an expansive parks and boulevard system to encircle Oklahoma City. Such ...

  11. Cullen College of Engineering Magazine Spring 2014

    E-Print Network [OSTI]

    Azevedo, Ricardo

    in Medicine I Fracking Definitions I Getting More Bang for Your Buck I In the Media 10 > Engineering News

  12. Middle Tennessee State University 1301 East Main Street

    E-Print Network [OSTI]

    Hong, Don

    of Education Building, 1756 MTSU Boulevard COGN Central Utility Plant/Cogeneration Plant, 729 Champion Way COMM

  13. May 20, 2014 Page 1 of 26 Sahu and Rincn-Mora Analog Integrated Circuits Laboratory

    E-Print Network [OSTI]

    Rincon-Mora, Gabriel A.

    buck-boost converter for low voltage, portable applications is reported. The converter's output voltage-inverting, Synchronous Buck­Boost Converter for Portable Applications Biranchinath Sahu, Student Member, IEEE-mathematical, intuitive analysis of the time-averaged, small-signal model of a non-inverting buck-boost converter. Index

  14. Department of Power Electronics and Electrical Drives Prof. Dr.Ing. Joachim Bcker

    E-Print Network [OSTI]

    Paderborn, Universität

    .­Ing. J. Böcker Power Electronics Trial Exam: (Summer Term 2014) Page 3 of 5 Task 2: Buck-Boost converter (25 Points) Figure 2 shows a buck-boost converter. The switches S1 and D1 are assumed to be ideal in continuous conduction mode. Fig.2 : Buck-Boost converter 2.1 Write down the differential equations

  15. Biranchinath Sahu, Student Member, IEEE, and Gabriel A. Rincn-Mora, Senior Member, IEEE Georgia Tech Analog and Power IC Design Laboratory

    E-Print Network [OSTI]

    Rincon-Mora, Gabriel A.

    a novel low voltage, dual-mode, buck-boost converter IC targeted for dynamic supplies of linear RF power µsec. Index Terms--Buck-boost converter IC, integrated power management, dual-mode converter I] and USB applications [2] a buck-boost converter is required to allow the Li-ion battery to be drained

  16. IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--II: EXPRESS BRIEFS, VOL. 55, NO. 5, MAY 2008 489 Sustained Slow-Scale Oscillation in Higher Order

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    ­dc converters, i.e., buck, buck­boost, and boost converters. In this paper, slow-scale bifurcation in a higher such as the buck-boost and flyback con- verters. For such higher order dc­dc converters under current- mode control Sustained Slow-Scale Oscillation in Higher Order Current-Mode Controlled Converter Siu Chung Wong, Member

  17. Controlling Chaos in DC/DC Converters Using Optimal Resonant Parametric Perturbation

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    perturba- tion method for controlling chaos in a current-mode con- trolled buck-boost converter of control. Specifically we make a chaotic buck-boost converter operate in an unstable period-1 orbit by a more complicated feedback chaos control method. II. CURRENT-MODE CONTROLLED BUCK-BOOST CONVERTER A

  18. INTERNATIONAL JOURNAL OF CIRCUIT THEORY AND APPLICATIONS Int. J. Circ. Theor. Appl. 2006; 34:251264

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    -scale bifurcation in power-factor-correction buck-boost converters and e ects of incompatible periodicities Jianlong-factor-correction (PFC) buck-boost converter in terms of a stroboscopic switching map. Fast-scale instability is analysed. Copyright ? 2006 John Wiley & Sons, Ltd. KEY WORDS: buck-boost converter; power factor correction; fast

  19. DistFlow ODE: Modeling, analyzing and controlling long distribution feeder

    E-Print Network [OSTI]

    Wang, Danhua

    We consider a linear feeder connecting multiple distributed loads and generators to the sub-station. Voltage is controlled directly at the sub-station, however, voltage down the line shifts up or down, in particular depending ...

  20. DOEIEIS-0106-F

    Broader source: Energy.gov (indexed) [DOE]

    and west to the proposed Bole Substat ion site, approxi mately seven m i les north of the town of Fa irfield. From here, the line proceeds northward to the Conrad Substat ion si...

  1. CX-001382: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation of a 138 Kilovolt Substation at Building 202 and Modification of Substation 549ACX(s) Applied: B4.11Date: 04/05/2010Location(s): IllinoisOffice(s): Science, Argonne Site Office

  2. CX-002213: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Spacer replacement along the Hanford-Wautoma #1 and #2 (substation to substation) transmission linesCX(s) Applied: B1.3Date: 04/23/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration

  3. Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003 

    E-Print Network [OSTI]

    Haberl, J. S.; Baltazar-Cervantes, J. C.; Liu, Z.; Claridge, D. E.; Turner, W. D.

    2003-01-01

    .................................................................................................................. 28 2.3.5. West Electrical Substation .................................................................................................................. 32 2.3.6. North Fort Hood Substation.......................................................................................................... 38 3.1.1.4. Chiller monitoring ........................................................................................................................... 38 3.1.1.5. Natural gas monitoring...

  4. CX-006289: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Willow Creek Substation -Transformer Replacement and Substation ModificationsCX(s) Applied: B4.6Date: 07/26/2011Location(s): Grand County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  5. BPA, Transmission, I-5 Corridor Reinforcement Project factsheet...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a new substation near Castle Rock, Wash.; a new 500 kV transmission line, a new Sundial Substation near Troutdale, Ore.; and new and improved access roads to these facilities....

  6. Chapter 2 Transmission Facility Siting, Route Segments and Action...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the new line and the existing line strung on the new towers. Substations A new 500-kV substation at each end of the transmission line. About 25-50 acres would be required for...

  7. Abstract--A measurement calibration method is described in this paper. The proposed method identifies calibration models

    E-Print Network [OSTI]

    in state estima- tion. Measurement calibration at the substation is a labor intensive and costly process that is described in [2]-[3] is executed at individual substations by taking advantage of the redundancy provided

  8. Crypto Corner Editors: Peter Gutmann, pgut001@cs.auckland.ac.nz

    E-Print Network [OSTI]

    Smith, Sean W.

    't wait seconds for the communication to fin- ish. We need to think about the latency cost of any a substation to open or close lines incorrectly, or impersonating a substation and lying to the con- trol

  9. Obama Administration Announces Job-Creating Grid Modernization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Minnesota and Wisconsin: This double- circuit capable 345 kV transmission line will run between a new substation near Hampton, Minnesota, a new substation north of Pine...

  10. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Utility Savings Category: Fuel Cells, Photovoltaics Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) This page describes...

  11. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Savings Category: Fuel Cells, Photovoltaics Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) This page describes...

  12. Enabling States and Localities to Improve Energy Assurance and...

    Office of Environmental Management (EM)

    our Nation's energy infrastructure - a complex network of interconnected producers, pipelines, transmission and distribution lines, electricity substations, operational and...

  13. EA-0587: Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of Northern States Power Company's  proposal to expand the Forbes Substation in Minnesota.

  14. The Building Adaptive Re-Use

    E-Print Network [OSTI]

    Flynn, E. Victor

    quality internal finishes without historic significance · Existing substation at basement level requiring in addressing these issues of cost an

  15. IEEE I&CPS Conf., May 7-11, San Antonio, Texas, pp. 147-152 Reliability of Lightning Resistant

    E-Print Network [OSTI]

    Tolbert, Leon M.

    facility 13.8 kV switchgear equipment, 37 padmounted unit substations and transformers, 46 pole mounted

  16. Microsoft Word - Whitepaper_The Modern Grid Vision_APPROVED_2009...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and reduce transmission congestion. Advanced transmission operations includes substation automation, integrated wide area measurement applications, power electronics, advanced...

  17. Modeling Complex Control Systems to Identify Remotely Accessible Devices Vulnerable to Cyber Attack1

    E-Print Network [OSTI]

    Krings, Axel W.

    Acquisition (SCADA) systems that allows us to calculate device vulnerability and help power substation and SCADA systems such as: "Which is the most vulnerable device of our power substation under an attack, SCADA. 1. Introduction Today's electric power substations are becoming more automated and connected

  18. Real time detection and correction of distribution feeder operational problems

    SciTech Connect (OSTI)

    Subramanian, A.K.; Huang, J.C.

    1995-12-31

    The paper presents a new technique that detects and corrects distribution operational problems using closed loop control of substation transformers, capacitors and reactors by an online computer. This allows the distribution system to be operated close to its capacity without sacrificing the quality of power supply. Such operations help defer the additional cost of installing new substations. The technique integrates the Distribution Feeder Analysis (DFA) and the Distribution Substation Control (DSC) functions to achieve this. The DFA function provides the topology and power flow results for the feeders using the substation real time measurements. It does not require feeder section measurements. The realtime feeder results are used in detecting any currently existing feeder operational problems such as feeder section voltages and currents outside their limits. The detected feeder problems are transformed into substation distribution bus objectives and then corrected by the DSC function using controls available at the substation. The DSC function has been performing successfully for several years at Potomac Electric Power Company (PEPCO) in Washington, D.C. It uses a closed loop control scheme that controls the substation transformer taps and shunt capacitor and reactor breakers and optimizes the substation operation. By combining the DFA and DSC functions into a single function and with proper transformation of feeder problems into substation objectives, a new closed loop control scheme for the substation controls is achieved. This scheme corrects the detected feeder problems and optimizes the substation operation. This technique is implemented and tested using the actual substation and feeder models of PEPCO.

  19. Wind Farm Reactive Support and Voltage Control Daniel F. Opila Abdi M. Zeynu Ian A. Hiskens

    E-Print Network [OSTI]

    Hiskens, Ian A.

    not behave as expected or become unstable. The third major issue is the high-level control of the substation devices in order to meet cost, maintenance, fault tolerance, or other requirements. This high a substation at the grid interconnection. These substations typically use Research supported by the Department

  20. EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California

    Broader source: Energy.gov [DOE]

    Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

  1. Chemical and isotopic characteristics of the coso east flank...

    Open Energy Info (EERE)

    Christenson, B. W.; Kennedy, B. M.; Adams, M. C.; Bjornstad, S. C.; Buck, C. . 182007. Chemical and isotopic characteristics of the coso east flank hydrothermal fluids:...

  2. Learning About Power Electronics in the Edison Program | GE Global...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DCDC converters (buck and boost), and the applications of power electronics (wind, solar, appliances, etc.). As an Electrical Engineer, though not one who has focused on...

  3. After the Flood [Portfolio

    E-Print Network [OSTI]

    Van Zante, Gary; Silvestri, Lisa

    2006-01-01

    Knopf, Silvestri / After the Flood Portfolio Canal Boulevard18.1 Silvestri / After the Flood Portfolio Above: LakeviewChurch Silvestri / After the Flood Portfolio St. Bernard

  4. Global Institute for Water Security National Hydrology Research Centre

    E-Print Network [OSTI]

    Saskatchewan, University of

    Global Institute for Water Security National Hydrology Research Centre 11 Innovation Boulevard Modelling The Global Institute for Water Security (GIWS) and the School for Environment and Sustainability

  5. Demonstration Assessment of LED Roadway Lighting: NE Cully Blvd., Portland, OR

    SciTech Connect (OSTI)

    Royer, M. P.; Poplawski, M. E.; Tuenge, J. R.

    2012-08-01

    GATEWAY program report on a demonstration of LED roadway lighting on NE Cully Boulevard in Portland, OR, a residential collector road.

  6. Bicycle Infrastructure that Extends beyond the Door: examining investments in bicycle-oriented design through a qualitative survey of commercial building owners and tenants

    E-Print Network [OSTI]

    Orrick, Phyllis; Frick, Karen; Ragland, David

    2010-01-01

    32. Association of Pedestrian and Bicycle Professionals.Bicycle Parking Guidelines, 2nd Edition. 2010.Transportation Division. Bicycle Boulevard Network. http://

  7. Bicycle Infrastructure that Extends beyond the Door: examining investments in bicycle-oriented design through a qualitative survey of commercial building owners and tenants

    E-Print Network [OSTI]

    Orrick, Phyllis; Frick, Karen; Ragland, David R

    2011-01-01

    Transportation Division. Bicycle Boulevard Network. http://fastlane.dot.gov/2010/07/us-bicycle-route- system-begins-Analysis of Investments in Bicycle Facilities. NCHRP Report,

  8. Bicycle Infrastructure that Extends beyond the Door: examining investments in bicycle-oriented design through a qualitative survey of commercial building owners and tenants

    E-Print Network [OSTI]

    Orrick, Phyllis; Frick, Karen Trapenberg; Ragland, David R

    2011-01-01

    32. Association of Pedestrian and Bicycle Professionals.Bicycle Parking Guidelines, 2nd Edition. 2010.Transportation Division. Bicycle Boulevard Network. http://

  9. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    Brisbane QLD Australia Forster Karl Martin D Christopher Department of Physics Math and Astronomy California Institute of Technology MC East California Boulevard Pasadena...

  10. Anacostia Tributary Trail System Paint Branch Trail

    E-Print Network [OSTI]

    Bernstein, Joseph B.

    Anacostia Tributary Trail System Paint Branch Trail Under Construction Under Construction B oulevard (M D 193) To University Boulevard Paint Branch Parkway Dickinson Avenue Princeton Avenue

  11. Dancing on the Rim of Dreams: A Variety Show Starring Five California Dance Pioneers in Five Acts With Prelude, Sagas, Historical Asides and Finale

    E-Print Network [OSTI]

    Murphy, Ann

    2011-01-01

    program cinched when the transcontinental railroad opened ins southernmost transcontinental interstate, extending fromBoulevard, is the transcontinental highway that opened in

  12. Generating Isolated Outputs in a Multilevel Modular Capacitor Clamped DC-DC Converter

    E-Print Network [OSTI]

    Tolbert, Leon M.

    -dc converters based on inductive energy transfer method (IETM) such as buck, boost, and buck-boost converter967 Generating Isolated Outputs in a Multilevel Modular Capacitor Clamped DC-DC Converter (MMCCC clamped dc-dc converter. The multilevel modular capacitor clamped converter (MMCCC) has several key

  13. General Impedance Synthesizer Using Minimal Configuration of Switching Converters

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    converter may contain a storage element and a pair of switches, such as the buck, buck-boost and boostGeneral Impedance Synthesizer Using Minimal Configuration of Switching Converters Joe C.P. Liu Chi a minimum number of switching converters is stud- ied in this paper. We begin with showing that any

  14. FPGA based digital controller for switch-mode converter P-2013-025 Student: Yaron Huber

    E-Print Network [OSTI]

    control scheme for DC-DC converters such as: boost or buck-boost. The control scheme is designed of minimal deviation control scheme on Boost converter using PSIM #12;2. Realization: Minimaldeviationcontroller-FPGA DC Buck - Boost converter Vin Inductor Load CapacitorSwitch Vout IL PCM main computational

  15. Approved Module Information for EE4PEL, 2014/5 Module Title/Name: Power Electronics Module Code: EE4PEL

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    , steady-state waveforms, and explain the operation of the buck, boost and buck/boost converters and Boost DC-DC converters and the single-phase rectifier. methods of DC-AC conversion. Module Delivery electronic converter, including the methods for the calculation of steady-state operating conditions

  16. General Impedance Synthesis Using Simple Switching Converters

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    -frequency storage element and a pair of switches, such as the buck, buck-boost and boost converters, as shown in FigGeneral Impedance Synthesis Using Simple Switching Converters Joe C. P. Liu, Chi K. Tse, Franki N converters is studied in this paper. We begin with showing that any impedance can be synthesized by a circuit

  17. Synthesis of Impedance Using Switching Converters Joe C.P. Liu

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    and a pair of switches, such as the buck, buck-boost and boost converters. The switches are switched Synthesis of Impedance Using Switching Converters Joe C.P. Liu Chi K. Tse Franki N.K. Poon M converters is stud- ied in this paper. We begin with showing that any impedance can be synthesized

  18. Abstract Many control schemes for dc-dc converters begin with the assertion that inductor currents are "fast" states and

    E-Print Network [OSTI]

    Kimball, Jonathan W.

    work, singular perturbation theory is applied to boost converters to provide rigorous justification derives from an analysis of an approximate model. Similar results hold for buck and buck-boost converters. An experimental boost converter and a simulated PFC boost support the derived requirement. Keywords

  19. INTERNATIONAL JOURNAL OF CIRCUIT THEORY AND APPLICATIONS Int. J. Circ. Theor. Appl. 2003; 31:555570 (DOI: 10.1002/cta.250)

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    and boost converters. The resulting dual converters operate in the discontinuous capacitor voltage mode of conventional boost and buck converters. Analytical design expressions are derived, illustrating the relation on cascade of boost and buck converters [1], (b) ÃCuk equivalence and (c) dual of the ÃCuk equivalence (new

  20. IEEE TRANSACTIONS ON POWER ELECTRONICS 1 Singular Perturbation Theory for DCDC Converters

    E-Print Network [OSTI]

    Kimball, Jonathan W.

    model. Similar results hold for boost, buck, and buck­boost converters. Experimental boost convertersIEEE TRANSACTIONS ON POWER ELECTRONICS 1 Singular Perturbation Theory for DC­DC Converters and Application to PFC Converters Jonathan W. Kimball, Senior Member, IEEE, and Philip T. Krein, Fellow, IEEE

  1. 842 IEEE TRANSACTIONS ON POWER ELECTRONICS, VOL. 13, NO. 5, SEPTEMBER 1998 New Single-Stage PFC Regulator Using the

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    is a modified boost converter, operates in discontinuous mode, and the output part, which is a buck converter comparisons between the Sheppard­Taylor converter and conventional boost and buck cascade are given was considered. At first glance, this converter possesses a similar property to the normal boost

  2. SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT F-62 Rocky Mountain Mule Deer

    E-Print Network [OSTI]

    . A late summer/fall drought can result in increased winter mortality of adults and fawns, lower fertility result in high mortality, especially among the old and young. Diet Mule deer diets are as varied the number of adult bucks available for breeding. From 1990 to 1998, the percentage of adult mule deer bucks

  3. Evaluation of whole cottonseed consumption on growth and reproductive function in male cervids 

    E-Print Network [OSTI]

    Brown, Cristy Gale

    2001-01-01

    reached 0.91 kg/head/day for older (2yr) and 0.68 kg/head/day for younger (1yr) bucks. Bucks were maintained on 1/4 acre ryegrass/coastal bermudagrass pasture with free access to minerals, salt and water. Alfalfa pellets were supplied at 0.45 kg...

  4. Name Address Use Location Description A 981 Madison Drive F/S Main Campus near Wilson Hall

    E-Print Network [OSTI]

    Arnold, Elizabeth A.

    Name Address Use Location Description A 981 Madison Drive F/S Main Campus near Wilson Hall A2 156 Bluestone Drive F/S Main Campus near Gibbons A3 851 University Boulevard Aux Main Campus Convo B 810 Madison Drive Student Main Campus near Burruss Hall B2 885 University Boulevard Aux Main Campus Convo C 897

  5. Public Comment Opportunities | Department of Energy

    Energy Savers [EERE]

    and Saguaro, Arizona substations. EIS-0463: Northern Pass Transmission Line Project, New Hampshire Draft EIS and Supplement to the Draft EIS: Public Comment Periods End 1416...

  6. Notices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of reasonable alternatives, and a No Action Alternative. The potential environmental impacts resulting from connected actions (wind energy generation and substation and...

  7. CX-010057: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  8. CX-012795: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    North Bonneville Substation 23- Kilovolt Line Retermination CX(s) Applied: B4.11Date: 41926 Location(s): WashingtonOffices(s): Bonneville Power Administration

  9. To complete the PMP and receive a Master of Science in Electrical Engineering, you must earn a total of 45 credits. Once you have

    E-Print Network [OSTI]

    Hochberg, Michael

    & Renewable Energy Analyzing the Power Grid Substation & Distribution Automation Wind Energy Wireless Master's Program in Electrical Engineering Take Advantage of the Convenient Evening Format

  10. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public......

  11. Joseph Rigby Chairman, President and CEO Pepco Holdings, Inc...

    Broader source: Energy.gov (indexed) [DOE]

    make equipment less susceptible to storm damage; Raising or moving vulnerable or outage-susceptible substations and other infrastructure to less damage prone areas and...

  12. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Broader source: Energy.gov (indexed) [DOE]

    consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing...

  13. Neutrons at April 15, 2015Rob Dimeo, NCNR Director

    E-Print Network [OSTI]

    Dimeo, Robert M.

    thermal shield cooling system Instrumentation and control upgrades Replaced primary storage tank pumps, etc... #12;secondary cooling pump building electrical substation thermal shield cooling system pool

  14. Whistling Ridge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    line approximately five miles west of BPA's Underwood Substation. BPA completed a joint environmental impact statement in August 2011 with the State of Washington Energy Facility...

  15. Optimal Deployment of Thermal Energy Storage under Diverse Economic and Climate Conditions

    E-Print Network [OSTI]

    DeForest, Nicolas

    2014-01-01

    G. Utilities load shift with thermal storage. Print article.tdworld.com/substations/thermal-storage-utilities-load-MS. Prospects of cool thermal storage utilization in Saudi

  16. NBP RFI: Communications Requirements- Honeywell Responses To...

    Broader source: Energy.gov (indexed) [DOE]

    (e.g., we do not consider communications necessary for phasor measurements, substation SCADA, protective relaying, etc.) NBP RFI: Communications Requirements- Honeywell Responses...

  17. NNSA Completes Successful Facilities and Infrastructure Recapitalizati...

    National Nuclear Security Administration (NNSA)

    and reduced deteriorated condition. Completed nine utility line item projects including power grid upgrades at Los Alamos National Laboratory, an electrical substation and a...

  18. Level 1 Accident Report of the March 1, 2010 Bobcat Fatality...

    Energy Savers [EERE]

    Bluffs Substation March 31, 2010 On March 2, 2010 at the request of the Bonneville Power Administration (BPA) Chief Safety Officer, a Level I Accident Investigation was...

  19. Home

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EIS Getting Involved Contact Us Search Comments Library Frequently Asked Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects...

  20. Emergency reconfiguration and distribution system planning under the Single-Contingency Policy

    E-Print Network [OSTI]

    Wang, J.

    Emergency reconfiguration can improve distribution systems' reliability by enabling load transfer among substations. Previous studies, although present its operation strategies, seldom explore emergency reconfiguration's ...

  1. Power Systems Past Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    loop and its six associated substations. An upgrade of the INL loop, designed by Power Systems personnel, was completed in 1997. This project consists of transmission line...

  2. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Offices(s): Western Area Power Administration-Upper Great Plains Region March 22, 2013 CX-010553: Categorical Exclusion Determination Appledorn Substation Construction CX(s)...

  3. 09-024 FOIA Correspondence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Sale and Disposal of Transformer(s) information for the following: * T01442, Tacoma Substation, released 7182007 and awarded 8207 * T00989, T00990 and T00991,...

  4. 09-024 FOIA Response

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Sale and Disposal of Transformer(s) information for the following: * T01442, Tacoma Substation, released 7182007 and awarded 8207 * T00989, T00990 and T00991,...

  5. THURSDAY: Deputy Secretary of Energy to Visit Western Area Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    will visit the Western Area Power Administration for a ceremony at the Electrical District No. 5 Substation to view progress on the Electrical District 5-to-Palo...

  6. CX-011177: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  7. Chapter I: Introduction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medium-high vulnerability to cyber and physical attacks and geomagnetic storms-large power transformers (LPTs) in such substations are a particular concern. A common...

  8. CX-006815: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cattle Creek SubstationCX(s) Applied: B4.11Date: 09/27/2011Location(s): Bonneville County, IdahoOffice(s): Bonneville Power Administration

  9. len Jr. Bl!ukr.'.lrd NV

    Broader source: Energy.gov (indexed) [DOE]

    of its trunsmission and distribution networks, the replacement of substation electromechanical relays with microprocessor relays, and the installation of digital fault...

  10. TO APPEAR IN IEEE TRANSACTIONS ON POWER SYSTEMS 1 Vulnerability Assessment of Cybersecurity for

    E-Print Network [OSTI]

    Manimaran, Govindarasu

    within the substation networks. Countermeasures are identified for improvement of the cybersecurity has also leveraged the cost of system deployment among the vendors to improve system upgradeability

  11. BPA, Transmission, I-5 Corridor Reinforcement Project, August...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Administration has refined the potential transmission line route segments and substation sites for the proposed I-5 Corridor Reinforcement Project. The refinements are...

  12. False Data Injection Attacks against State Estimation in Electric Power Grids

    E-Print Network [OSTI]

    Ning, Peng

    the measurements of meters at physically protected locations such as substations, such attacks can introduce of about 50 million people. The estimated total cost

  13. Western Area Power Administration Transmission Infrastructure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    connecting near line's midpoint 161 million in TIP funding; 213 million project cost Substation construction began June 2010 Transmission construction began...

  14. energy: Supply, Demand, and impacts CooRDinATinG LeAD AUThoR

    E-Print Network [OSTI]

    Kammen, Daniel M.

    , - reduced transmission line, substation, and transformer capacities due to elevated temperatures" cost the United States about $80 billion every year in lost services, industrial capacity, and gross

  15. 1836 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 23, NO. 4, NOVEMBER 2008 Vulnerability Assessment of Cybersecurity

    E-Print Network [OSTI]

    Manimaran, Govindarasu

    within the substation networks. Countermeasures are identified for improvement of the cybersecurity for wide area communication. The compatibility of standards has also leveraged the cost of system

  16. EECBG Success Story: Police Station Triples Solar Power - and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the North Community Police Substation in Henderson, Nevada installed new, roof-top photovoltaic panels that provide almost 40% of the station's electricity, up from 12.5%....

  17. Nature and Origin of the Cuprate Pseudogap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through HTSC cable. That same year, three 400-foot HTSC cables were installed for Detroit Edison at the Frisbie Substation that could deliver 100 million watts of power....

  18. 09-043 FOIA Correspondence.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and supporting material that resulted from RFP 1831-Allston Substation Spare Transformer, for which bids were submitted to Christina Craig on 4202009. Letter of notice of...

  19. Richard Shaheen named Senior VP of Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission lines and initiated upgrades to Celilo Substation and the Pacific Direct Current Intertie. "Richard is an excellent leader, and his 25-plus years of experience at a...

  20. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission lines and initiated upgrades to Celilo Substation and the Pacific Direct Current Intertie. "Richard is an excellent leader, and his 25-plus years of experience at a...

  1. International Microgrid Assessment: Governance,INcentives, and Experience (IMAGINE)

    E-Print Network [OSTI]

    Romankiewicz, John

    2014-01-01

    loads, and to integrate demand response and control, all ofor substation) using demand response and DER (Bossart,Participation in demand response markets X X Economic (

  2. CX-012808: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    LURR 20140504 Ross Substation Comcast Fiber Installation CX(s) Applied: B4.9Date: 41906 Location(s): WashingtonOffices(s): Bonneville Power Administration

  3. 3-4-10_Final_Testimony_28SWPA29_28Worthingon29.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    operates and maintains 1,380 miles of high-voltage transmission lines, 25 substations and switching stations, and a communications system that includes microwave, VHF radio, and...

  4. 3-15-11_Final_Testimony_(Worthington)_(SWPA).pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    operates and maintains 1,380 miles of high-voltage transmission lines, 25 substations and switching stations, and a communications system that includes microwave, VHF radio, and...

  5. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Energy Savers [EERE]

    Mountain Region August 14, 2014 CX-012767: Categorical Exclusion Determination Medicine Bow Substation Control Building Installation Project Carbon County, Wyoming CX(s)...

  6. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  7. Microsoft Word - PR1312_M2W1.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wash. The proposed upgrades would increase available transmission capacity from BPA's Garrison Substation in western Montana to power markets that serve the entire Northwest....

  8. CX-011239: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Security Upgrades at Multiple Substations CX(s) Applied: ? Date: 10/02/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

  9. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Fact...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Washington. The purpose is to increase available transmission capacity from BPA's Garrison Substation in Western Montana to power markets west of the Cascades that serve the...

  10. BPA transmission, I-5 corridor reinforcement project, updated...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    It does not represent any legal information or boundaries. Source: BPA Regional GIS Database, 2009. Facilities Proposed New Substation sde.SDE.BPAPlannedTlines...

  11. I-5project08-18parcels.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    It does not represent any legal information or boundaries. Source: BPA Regional GIS Database, 2009. LEGEND Facilities Proposed New Substation Proposed Route Segments BPA...

  12. BPA, proposed I-5 Corridor Reinforcement transmission project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    It does not represent any legal information or boundaries. Source: BPA Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA...

  13. EIS-0400: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission...

  14. EIS-0483: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    3: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0483: EPA Notice of Availability of Draft Environmental Impact Statement Estes to Flatiron Substation...

  15. EIS-0400: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Draft Environmental Impact Statement EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard Windy Gap Substation...

  16. EAC Recommendations for DOE Action on a Strategic Portable Generation...

    Energy Savers [EERE]

    distribution substation and its loads. Even if these Reserve units could deploy, the logistics of fuel supply within the larger area of sustained damage would not be trivial....

  17. CX-012658: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Chief Joseph and Custer Substations Security Fence Replacement CX(s) Applied: B1.11Date: 41843 Location(s): WashingtonOffices(s): Bonneville Power Administration

  18. UNITED STATES OF AMERICA BEFORE THE DEPARTMENT OF ENERGY

    Office of Environmental Management (EM)

    devices and networks in the transmission and distribution domains; facilitate substation automation, communication, and interoperability through a common data format; facilitate...

  19. Patricia Hoffman Assistant Secretary Office of Electricity Delivery...

    Office of Environmental Management (EM)

    substation automation, and communications) by eliminating waste or diverting funding from system expansion to system improvement. LBNL, DOE, and EPRI 1,2,3,4 estimate that...

  20. SECTION III

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    regional transmission organizations (RTO) to more effectively utilize the distribution system as a -resource. ATO includes substation automation, advanced protection and...

  1. Smart Grid Newsletter ? The Regulators Role in Grid Modernization...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    more effectively utilize the distribution system as a "resource". ATO includes substation automation, advanced protection and control, modeling, simulation and visualization tools,...

  2. Life-cycle Environmental Inventory of Passenger Transportation in the United States

    E-Print Network [OSTI]

    Chester, Mikhail V

    2008-01-01

    and  substation  (electricity  transmission  system  for For  electricity, transmission and distribution  loses are 32 – Rail Electricity Precombustion and Transmission and 

  3. M

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3: Groundwater Resources Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads Existing Public or Private Roads Dam County Boundary State...

  4. IEC 61850 Industrial Communication Standards under Test

    E-Print Network [OSTI]

    Tilaro, F M; Gonzalez-Berges, M

    2014-01-01

    IEC-61850, as part of the International Electrotechnical Commission's (IEC) Technical Committee 57 (TC57), defines an international and standardized methodology to design electric power automation substations.

  5. EIS-0395: San Luis Rio Colorado Project, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to construct and operate a proposed transmission line originating at the proposed San Luis Rio Colorado (SLRC) Power Center in Sonora, Mexico, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company’s (APS) North Gila Substation

  6. AUTOMATED UTILITY SERVICE AREA ASSESSMENT UNDER EMERGENCY CONDITIONS

    SciTech Connect (OSTI)

    G. TOOLE; S. LINGER

    2001-01-01

    All electric utilities serve power to their customers through a variety of functional levels, notably substations. The majority of these components consist of distribution substations operating at lower voltages while a small fraction are transmission substations. There is an associated geographical area that encompasses customers who are served, defined as the service area. Analysis of substation service areas is greatly complicated by several factors: distribution networks are often highly interconnected which allows a multitude of possible switching operations; also, utilities dynamically alter the network topology in order to respond to emergency events. As a result, the service area for a substation can change radically. A utility will generally attempt to minimize the number of customers outaged by switching effected loads to alternate substations. In this manner, all or a portion of a disabled substation's load may be served by one or more adjacent substations. This paper describes a suite of analytical tools developed at Los Alamos National Laboratory (LANL), which address the problem of determining how a utility might respond to such emergency events. The estimated outage areas derived using the tools are overlaid onto other geographical and electrical layers in a geographic information system (GIS) software application. The effects of a power outage on a population, other infrastructures, or other physical features, can be inferred by the proximity of these features to the estimated outage area.

  7. Overview of BNL's Solar Energy Research Plansgy

    E-Print Network [OSTI]

    Homes, Christopher C.

    Overview of BNL's Solar Energy Research Plansgy March 8, 2011, #12;Outline O i f th LISF S l PV P j Field LIPA Substation South Array Field LIPA Substation #12;#12;#12;BNL is developing a solar energy, February 2009 · EERE Renewable Systems interconnection Study, February 2008 · EERE Solar Energy Technology

  8. Solar Grid Integration Industrial Research Perspectives

    E-Print Network [OSTI]

    Homes, Christopher C.

    with 25 inverters) Substation 1 Substation 2 Solar Power Generation Wind Generation 100 MW Wide variety Analysis AC Balance of plant Power conversion & grid interface key to system wide reliability #12;4 Presenter and Event 3/30/2011 Solar Power Generation Traditional Power Generation 500 MW Coal Power Plant 10

  9. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303–326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 7–8 existing substations.

  10. Varieties of Cotton in the Red Prairies of Northwest Texas. 

    E-Print Network [OSTI]

    Quinby, John Roy

    1927-01-01

    ......................................... Results in 1924 12 ......................................... ResuTts in 1925 13 .......................................... Resnlts in 1926 14 BULLETIN NO. 366 - NOVEMBER, 1927 VARIETIES OF COTTON IN THE RED PRAIRIES OF NORTH- WEST TEXAS Substation No..... ............... Durango. ................. Sunshine.. ................ Rowden.. ................. Snowflake.. ............... Summerour & Co Vernon Texas Summerour & SO; ~erno; Texas R. E. Hudson, ~uhurn, AI;. Cris Reuter, New Orleans, La. Texas Substat~on No.. 12...

  11. IMPULSIVE NOISE MODELLINGAND PREDICTION OF ITS IMPACT ON THE PERFORMANCE OF WLAN RECEIVER

    E-Print Network [OSTI]

    Atkinson, Robert C

    with the deployment of wireless equipment in electricity substations the BER performance of IEEE 802.11b and IEEE 802. INTRODUCTION Deployment of wireless communications equipment in electricity substation for monitoring, control of convenience, flexibility and cost [1, 2]. Typically wireless transceiver designs are based on the assumption

  12. Preprint of the paper "A Boundary Element Numerical Approach for Earthing Grid Computation"

    E-Print Network [OSTI]

    Colominas, Ignasi

    ~na, SPAIN Abstract Analysis and design of substation earthing involves computing the equivalent re- sistance in the margin of error [4]. A Boundary Element approach for the numerical computation of substation grounding introduced in the BEM formulation to reduce computational cost for speci#12;c choices of the test and trial

  13. Outage Detection in Power Distribution Networks with Optimally-Deployed Power Flow Sensors

    E-Print Network [OSTI]

    Zhao, Yue

    distribution networks. As society becomes more dependent on electric power, the economic and societal costs due sensor at the substation [2]. In networks This research was supported in part by the DTRA under Grant a single digital transient recording device at the substation, fault location and diagnosis systems have

  14. Simulating calculations and optimization design of a new HVDC supply power for light rail system

    E-Print Network [OSTI]

    Boyer, Edmond

    investments and operation costs [1]. A light rail system is a complex system including a moving electrical with megawatt bulk substations, which includes a power transformer, a rectifier with diodes and protections [2]. This kind of substation is uncontrollable and irreversible, which limits the possible improvement

  15. Abstract--This paper formulates and develops a peak demand control tool for electric systems within the framework of direct

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    . The generic model presented herein is evaluated in an actual urban substation, characterized by a predominant commercial consumption, by the contribution of the air conditioning systems in the substation loads expansions. Currently, the high investment costs in new capacity have taken distribution firms to search

  16. Intelligent Agents And Distributed Models For

    E-Print Network [OSTI]

    Mitchell, Richard

    high development costs Computer Supported Cooperative work growing field; seemed appropriate here #12 with outages, maintenance (Real) Example Switching Scenarios 10 outage and substation rearrangements environment substation settings, in the example Desires process active automata to final state (ie to finish

  17. Preprint of the paper "High performance computing for the analysis and postprocessing of earthing

    E-Print Network [OSTI]

    Colominas, Ignasi

    in certain places of the substation site. Its main objective is the transport and dissipation of electrical been systematically reported, such as the large computational costs required in the anal- ysis of real the construction of the substation produces a stratified soil, or as a con- sequence of a chemical treatment

  18. Condition Data Aggregation with Application to Failure Rate Calculation of Power Transformers

    E-Print Network [OSTI]

    , Ames, IA 50011-1040, USA {jpathak, jiangy, honavar, jdm}@iastate.edu Abstract Cost-effective equipment substation equipment condition data collected from distributed data resources, some of which may be local to the substation, to develop Hidden Markov Models (HMMs) which transform the condition data into failure

  19. Towards parametric environmental profiles of complex industrial systems in

    E-Print Network [OSTI]

    Boyer, Edmond

    and quality. This article proposes a Life Cycle Assessment of an Alstom Grid AC/DC conversion substation of the substation. Based on design of experiments, a more advanced model of such a tool would permit to identify the best configuration in terms of environmental performance, costs and reliability. Keywords: Eco

  20. 1 Introduction Nowadays more people are in favor of removing the

    E-Print Network [OSTI]

    Bak, Claus Leth

    the changes in the reactive power balance in the grid and save cost of switchgear for the reactor is a planned 18,5 km underground cable line from 60 kV substation Ålbæk to 60 kV substation Hedebo in ENV

  1. UML and Concurrency Perdita Stevens

    E-Print Network [OSTI]

    Stevens, Perdita

    premature decisions about ordering of events. 6 #12;Basic "flow chart" activity diagram Calculate total cost Get authorisation Charge account [else] [cost>$50] 7 #12;Concurrency in activity diagrams A1 A2 A3 8-fork = enter state with n concurrent substates n-join = leave state with n concurrent substates This severely

  2. Dynamic-Priority based Event-Driven Communication in Smart Grid

    E-Print Network [OSTI]

    Mazumder, Sudip K.

    classes of load-demands and the EMS processing cost. The performance evaluation results show to the load EMS (for aggregation) using an underlying NAN. The load EMS communicates with the sub-station EMS Station EMS Distribution Substation Utility DER 1 Power Bus Communication Interface Wide Area Network DER

  3. University Of Washington Faculty Council on Faculty Affairs

    E-Print Network [OSTI]

    Van Volkenburgh, Elizabeth

    at Specific Ranks and Titles - Language Review Draft language for delegating authority to recommend renewals lecturers are uncommon. Steve Buck also noted tension between designating Chairs with the power to make

  4. Building a landscape for dwelling

    E-Print Network [OSTI]

    Raphael, Michael B

    1981-01-01

    This thesis is an examination of future growth outside of the towns and suburban developments in Upper Bucks County, Pennsylvania. Its aim is to offer projections for inhabitable physical form. These projections will be ...

  5. Physically constrained maximum likelihood (PCML) mode filtering and its application as a pre-processing method for underwater acoustic communication

    E-Print Network [OSTI]

    Papp, Joseph C

    2009-01-01

    Mode filtering is most commonly implemented using the sampled mode shape or pseudoinverse algorithms. Buck et al [1] placed these techniques in the context of a broader maximum a posteriori (MAP) framework. However, the ...

  6. Longitudinal ultrasound measurement of the equine third metacarpal bone as a predictor of mechanical testing properties 

    E-Print Network [OSTI]

    Dyer, Stephanie Ann

    1999-01-01

    diagnostic technique to identify the onset of bucked shins. The purpose of this study was to determine if the longitudinal speed of sound as measured by Soundscan 2000[] was an appropriate predictor of bone strength characterized by mechanical testing...

  7. Digital Switching CMOS Power Amplifier for Multiband and Multimode Handset Applications /

    E-Print Network [OSTI]

    Nakatani, Toshifumi

    2013-01-01

    voltage. Therefore, a boost converter is needed. RegardingSEPIC is a kind of buck-boost converter, the supply voltagevoltage is 2.8 V and no boost converter is needed to supply

  8. Illinois and Texas Towns See Weatherization Boost

    Broader source: Energy.gov [DOE]

    “It cropped about a hundred bucks off my bill in the cold, cold winter,” says Springfield resident Donald Dagget, a 78-year-old retired beauty salon owner who had his 1937, two-bedroom bungalow weatherized in October.

  9. Jefferson Lab plans ‘Science is Cool’ Open House...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the day. Free, public parking for the Open House will be at the Canon Virginia parking lot located at 12000 Canon Boulevard, in the Oyster Point area of Newport News, Va....

  10. MFR PAPER 1216 The Workshop on Molluscan

    E-Print Network [OSTI]

    of Kansas Medical Center, 39th and Rainbow Boulevard, Kansas City, KS 66103. October 1976 DANTE G. SCARPELLI such as a hydrocarbon present in fuel oil, for example, and the ultimate development of a "tumor". The autonomous nature

  11. Revised 7/2012 The University of North Carolina at Charlotte

    E-Print Network [OSTI]

    Howitt, Ivan

    Revised 7/2012 The University of North Carolina at Charlotte 9201 University City Boulevard Charlotte, NC 28223-0001 Non-North Carolina Community College Transfer Guide into the Belk College

  12. Department of Chemistry and Biochemistry Queens College, City University of New York

    E-Print Network [OSTI]

    Johnson Jr.,, Ray

    Department of Chemistry and Biochemistry Queens College, City University of New York 65-30 Kissena Boulevard, Flushing New York 11367 Website - http://chem.qc.cuny.edu/ sjjang (Tel)(718) 997-4110, (Fax)(718

  13. Susan Martindale

    Office of Environmental Management (EM)

    the Environment Air and Radiation Management Administration 1800 Washington Boulevard Baltimore, Maryland 21230 (410) 537-4422 FAX: (410) 537-3198 ajacobson@mde.state.md.us Cash...

  14. Ichthyoplankton surveys provide fish-eries-independent information that is

    E-Print Network [OSTI]

    : fhernandez@disl.org 1 Dauphin Island Sea Laboratory 101 Bienville Boulevard Dauphin Island, Alabama 36528 2 off the coast of Alabama as part of a long-term bio- logical survey. Four seasonal periods were

  15. Jefferson Lab plans "Celebration of Science" Open House...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Boulevard, in the Oyster Point area of Newport News. Follow the event parking signs onto Old Oyster Point Road to access the Canon Virginia parking lot. Visitors may arrive...

  16. CAES Home

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAES Building The 55,000-square-foot Center for Advanced Energy Studies building is located on University Boulevard in Idaho Falls, near both Idaho State University's University...

  17. The variation of apparent crown size and canopy heterogeneity across

    E-Print Network [OSTI]

    Malhi, Yadvinder

    , 2 IRD-UMR Botanique et Bioinformatique de l'Architecture des Plantes (AMAP), Boulevard de la Lironde and Africa. Some regions show significantly greater canopy heterogeneity, a feature that may be related

  18. Detection of inplane and outofplane ultrasonic displacements by a twochannel confocal FabryPerot interferometer

    E-Print Network [OSTI]

    Paris 7 - Denis Diderot, Université

    .g., in the aeronautic and automotive industries, are thin and made of a single sheet of metal or composite material National Research Council Canada, Industrial Materials Institute, 75 De Mortagne Boulevard, Boucherville

  19. Bounds for Right Tails of Deterministic and Stochastic Sums of Random Variables

    E-Print Network [OSTI]

    Vanmaele, Michèle

    , whereas investment returns are modeled by a Brownian motion process. Keywords: stop-loss premium, right, ECARES and Solvay Business School, Universit´e Libre de Bruxelles, Boulevard du Triomphe 2, CP 210, 1050

  20. EIS-0453: Recapitalization of Infrastructure Supporting Naval...

    Office of Environmental Management (EM)

    Reading Room 2251 N. Boulevard Idaho Falls, ID 83402 Telephone: (208) 526-1185 Marshall Public Library 113 South Garfield Pocatello, ID 83204 Telephone: (208) 232-1263 Idaho...

  1. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #6

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #6 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 15 July 2009 #12;2 Ecological Studies of Willow (Salix

  2. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #11

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #11 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 15 January 2010 #12;2 Ecological Studies of Willow (Salix

  3. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #5

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #5 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 15 June 2009 #12;2 Ecological Studies of Willow (Salix

  4. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #4

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #4 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 15 May 2009 #12;2 Ecological Studies of Willow (Salix

  5. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #9

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #9 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 11 November 2009 #12;2 Ecological Studies of Willow (Salix

  6. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #3

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #3 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 15 April 2009 #12;2 Ecological Studies of Willow (Salix

  7. ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #10

    E-Print Network [OSTI]

    1 ECOLOGICAL STUDIES OF WILLOW (SALIX CAROLINIANA): MONTHLY STATUS REPORT #10 Pedro Quintana Florida Boulevard, Orlando, Florida 32816 15 December 2009 #12;2 Ecological Studies of Willow (Salix

  8. Volume 11, Number 12 31 December 2010

    E-Print Network [OSTI]

    Hooft, Emilie

    97403, USA (emilie@uoregon.edu) Hemalinee Patel British Petroleum, 501 Westlake Park Boulevard, Houston 98115, USA Earl Davis Pacific Geoscience Center, Geological Survey of Canada, Sidney, British Columbia V

  9. Fingerprint Classification using Fast Fourier Transform

    E-Print Network [OSTI]

    Park, Haesun

    Minneapolis, MN 55455, USA chpark, hpark @cs.umn.edu Abstract In this paper, we present a new approach, USA. ÞH. Park is in the National Science Foundation, 4201 Wilson Boulevard, Arlington, Virginia 22230

  10. PRESIDENT'S INFORMATION TECHNOLOGY ADVISORY COMMITTEE Panel on Transforming Health Care

    E-Print Network [OSTI]

    Horvitz, Eric

    #12;PRESIDENT'S INFORMATION TECHNOLOGY ADVISORY COMMITTEE Panel on Transforming Health Care February 2001 Transforming Health Care Through Information Technology REPORT TO THE PRESIDENT #12;c/o National Coordination Office for Information Technology Research & Development 4201 Wilson Boulevard

  11. Open for Business? Effects of Los Angeles Metro Rail Construction on Adjacent Businesses

    E-Print Network [OSTI]

    Ray, Rosalie Singerman

    2015-01-01

    Metro Rail Red Line under Vermont and Hollywood Boulevards.Red Line from Wilshire/Vermont to Hollywood/Highland, whichthe Red Line Corridor (Vermont/Sunset to Hollywood/Highland)

  12. Design and Experimental Results for the S809 Airfoil

    Office of Scientific and Technical Information (OSTI)

    K K J K fJf ** * ** l1liJ JK J - K National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 A national...

  13. DOI: 10.1542/peds.2008-1606 2009;123;1383-1391Pediatrics

    E-Print Network [OSTI]

    Dobkins, Karen R.

    by the American Academy of Pediatrics, 141 Northwest Point Boulevard, Elk publication, it has been published; iDepartment of Psychiatry, University of North Carolina, Chapel Hill, North Carolina; j

  14. DOI: 10.1542/peds.2009-0958 published online Nov 30, 2009;Pediatrics

    E-Print Network [OSTI]

    California at Davis, University of

    by the American Academy of Pediatrics, 141 Northwest Point Boulevard, Elk publication, it has been publishedDepartment of Psychiatry, University of North Carolina, Chapel Hill, North Carolina; cDepartment of Psychology, e

  15. DIMACS Technical Report 2009-02 February 2009

    E-Print Network [OSTI]

    , University of Li`ege, Boulevard du Rectorat 7 (B31), B-4000 Li`ege, Belgium; Yves.Crama@ulg.ac.be 4Our of algorithms proposed in the classification and data mining literature. The evaluation of the quality

  16. Control of Initiation, Rate, and Routing of Spontaneous Capillary-Driven Flow of Liquid Droplets through Microfluidic Channels on

    E-Print Network [OSTI]

    Ismagilov, Rustem F.

    Engineering, California Institute of Technology, 1200 East California Boulevard, Pasadena, California 91125-of-care assays such as glucose monitors that must transport an aqueous sample from a loading region to an assay

  17. Hypervelocity Impact Effect of Molecules from Enceladus' Plume and Titan's Upper Atmosphere on NASA's Cassini Spectrometer from Reactive Dynamics Simulation

    E-Print Network [OSTI]

    Goddard III, William A.

    E. California Boulevard, Pasadena, California 91125, USA Luther W. Beegle and Robert Hodyss Jet achieves a direction-dependent ram enhancement of the gas pressure in the antechamber above

  18. WORKING PAPER N 2009 -41 Migration and capital accumulation

    E-Print Network [OSTI]

    Boyer, Edmond

    , remittances, capital accumulation, rural poverty PARIS-JOURDAN SCIENCES ECONOMIQUES LABORATOIRE D. Key Words: Migration; Remittances; Capital Accumulation; Rural Poverty. Paris School of Economics (PSE) and Poverty Action Lab (J-PAL Europe), 48 Boulevard Jourdan, 75014 Paris, France. chiodi

  19. Solar Radiation Data Manual for Flat-Plate and Concentrating...

    Office of Scientific and Technical Information (OSTI)

    state or reflect those of the United States government or any agency thereof. National Renewable Energy Laboratory '16'17 Cole Boulevard Golden, Colorado 80401-3393 A national...

  20. Women's Health in California: Health Status, Health Behaviors. Health Insurance Coverage and Use of Services Among California Women Ages 18-64

    E-Print Network [OSTI]

    Wyn, Roberta; Hastert, Theresa A.; Peckham, Erin

    2008-01-01

    www.chis.ucla.edu. UCLA CENTER FOR HEALTH POLICY RESEARCHWOMEN’S HEALTH IN CALIFORNIA 10960 Wilshire Boulevard, SuiteWomen’s Health in California: Health Status, Health

  1. Design and Implementation of Switching Voltage Integrated Circuits Based on Sliding Mode Control 

    E-Print Network [OSTI]

    Rojas Gonzalez, Miguel Angel

    2010-10-12

    .S. (Honors), ITESM Campus Toluca, Mexico Chair of Advisory Committee: Dr. Edgar S?anchez-Sinencio The need for high performance circuits in systems with low-voltage and low-power requirements has exponentially increased during the few last years due... measurements of the dual-output buck voltage regulator for (a) Medium load condition and (b) High load condition : : : 207 132 (a) Power efficiency measurements of the dual-output buck voltage versus both output currents and (b) Top view...

  2. KU Today, May 15, 2012

    E-Print Network [OSTI]

    program? Extras are available while supplies last at the Wesley building, which is located just east of Smith Hall along Jayhawk Boulevard. TWITTER @KUCheer Lots of Jayhawk love in KU alumnus Rob Riggle's video on tips for hosting the 2012 ESPY... program? Extras are available while supplies last at the Wesley building, which is located just east of Smith Hall along Jayhawk Boulevard. TWITTER @KUCheer Lots of Jayhawk love in KU alumnus Rob Riggle's video on tips for hosting the 2012 ESPY...

  3. CX-008678: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration

  4. Aalborg Universitet Comparison of overhead line lightning performance based on two different tower

    E-Print Network [OSTI]

    Bak, Claus Leth

    , Norway, Germany and the offshore wind farms in Horns Rev, Denmark. The new Eagle pylon has been designed TSO is in the process of constructing a new gas insulated substation (GIS) in Revsing. This includes

  5. Click to edit Master title style ENGINEERING, ARCHITECTURE, CONSTRUCTION,

    E-Print Network [OSTI]

    Subramanian, Venkat

    Click to edit Master title style ENGINEERING, ARCHITECTURE, CONSTRUCTION, ENVIRONMENTAL & Federal · Business & Technology Services · Construction/Design ­ Build · Energy · Environmental · Global · Combustion Improvement Programs · High Voltage Design · Substations and Transmission Lines · Controls Systems

  6. CIFMA04 -IFCAM04, 26-28 Avril/April 2010 1 Transforming your computer center to an Emulated Industrial

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Industrial Automation System (IAS) network performance and respond a lot of industrial interrogations, Industrial network. 1. Introduction The automation of industrial installations is nowadays ensured using automation system `IAS' architecture. Substation Automation System `SAS' is one of these industrial

  7. CX-012190: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Murray, Snohomish, and Sno-King Substations Equipment Acquisition CX(s) Applied: B1.24 Date: 05/21/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  8. CX-012644: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Puget Sound Area Northern Intertie (PSANI) - Covington and Raver Substation Upgrades CX(s) Applied: B1.3, B1.24, B4.11Date: 41864 Location(s): WashingtonOffices(s): Bonneville Power Administration

  9. EIS-0421: Big Eddy-Knight Transmission Line

    Broader source: Energy.gov [DOE]

    BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line...

  10. CX-011832: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    McNary Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 01/29/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  11. CX-012081: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kimball Substation KY1A Transformer Replacement and Road Maintenance CX(s) Applied: B1.3 Date: 02/10/2014 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-000556: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Willoby Substation Construction Project-Weld County, ColoradoCX(s) Applied: B4.11Date: 12/16/2009Location(s): Weld County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-005115: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Weld Substation Transformer Placement, Greeley, Weld County, ColoradoCX(s) Applied: B4.6Date: 01/07/2011Location(s): Greeley, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-012108: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  15. Microsoft Word - Cover Page - Exhibit 12

    Office of Environmental Management (EM)

    South of Lost Nation Substation) Wetland Functions and Values 3 Town Data ID NWI Class 1 Acreage VP ID 2 GWR FFA FSH STR NR PE SSS WH REC ESV UH VQA ETS Northumberland NU1...

  16. CX-004752: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Havre Substation Stage 03CX(s) Applied: B4.11Date: 12/13/2010Location(s): MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region

  17. Insects of the Garden, With a Chapter on the Melon Louse and Other Aphids. 

    E-Print Network [OSTI]

    Conradi, Albert F. (Albert Frederick); Sanborn, C. E.

    1906-01-01

    Cle MISS M. H. WATKINS ........................................ 1 . Stenograp? tor :or rol ~t-k ,A ier STATE SUB-STATIONS S. A. WASCHKA, superintendent ........... .................. Trou p Smith County W. S. HOTCHKISS, Superintendent... .......... ........ ... ............................................................................................................ 18 Squash .............................................................................................................................. .......................... 18 Onion...

  18. CX-009531: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ault Substation Drainage Swale Construction CX(s) Applied: B4.6 Date: 12/13/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    power. BPA owns and maintains 260 substations and over 15,000 miles of high-voltage electric transmission lines. As those facilities age and the region's population grows,...

  20. Re: Potomac River Generating Station Department of Energy, Case...

    Office of Environmental Management (EM)

    2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the planned outage of the 230 kV circuits serving the Potomac River Substation, and through that station,...

  1. Cyber Academic Group Brown Bag Guest Lecture

    E-Print Network [OSTI]

    conducted SCADA, substation, plant control system, and water systems vulnerability Applied Control Solutions, LLC. The State of Cyber Security in Industrial Control Systems 1200 This talk will explore control system cyber security, how is it different than

  2. CX-012080: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Deering Lake and Yuma Substation Upgrades CX(s) Applied: B4.6 Date: 03/06/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-007808: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mesa Substation Soil Remediation Assessment CX(s) Applied: B3.1 Date: 12/12/2011 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  4. CX-011723: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Happy Jack 230 Kilovolt Substation Fiber Optic Installation in Laramie County, Wyoming CX(s) Applied: B4.7 Date: 12/31/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. Transforming Public Policy: Toward Smart Selfhealing

    E-Print Network [OSTI]

    Amin, S. Massoud

    necessary to support our economy and quality of life. #12;Sociotechnological systems include the physical ... and Global Transition Dynamics #12;Infrastructure Interdependencies natural gas electric power control system communication energy commodity transportation traffic light end office substation power plant

  6. EIS-0285: Transmission System Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This...

  7. Task 3 - RMC method validation project report

    SciTech Connect (OSTI)

    Sarkinen, R.A.

    1996-08-01

    The EPRI Substation Reliability Centered Maintenance Project Task 3 uses utility data to validate the RCM process for maintenance in substations. At BPA, this project was used to validate the RCM method for a preventive maintenance program for substations. This project was performed by an RCM technical team and all maintenance personnel at the Chemawa Maintenance District Headquarters. The system chosen for, this project involved four transmission lines that feeds 230 kV Santiam Substation. This report explains the process for the system approach-used for the Santiam project and a summary of the results. The current preventive maintenance program is primarily based on time. The RCM approach for a preventive maintenance program realized significant savings.

  8. CX-006243: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Modification to Hayden Substation, Routt County, ColoradoCX(s) Applied: B4.6Date: 06/14/2011Location(s): Hayden, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-010552: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Big George Substation Access Road Snow Prevention, Park County, Wyoming CX(s) Applied: B1.11 Date: 06/20/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  10. UC Irvine Profit Plus Planet Strategic Partnerships

    E-Print Network [OSTI]

    Loudon, Catherine

    for water quality, energy and system management.) System, Monitoring & Control (Analytics and instrumentation providers for water quality, energy and system management.) Storm Water Management Efficiency Distribution & Substation Automation Demand Response Meters/AMI/ MDMS Home Energy Management Building

  11. CX-012738: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Gila Substation Geotechnical Study CX(s) Applied: B3.1Date: 41857 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  12. CX-010416: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10416: Categorical Exclusion Determination CX-010416: Categorical Exclusion Determination Substation Maintenance and Renovation Activities CX(s) Applied: B1.3, B1.7, B1.11, B1.27,...

  13. CX-002771: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Marion and Sand Springs Substations Radio Tower ProjectsCX(s) Applied: B1.19Date: 06/08/2010Location(s): Marion, OregonOffice(s): Bonneville Power Administration

  14. Data Integration and Information Exchange for Enhanced Control and Protection of Power Systems

    E-Print Network [OSTI]

    (SCADA) System . The SCADA system acquires and processes field data through Remote Terminal Units (RTUs substation relaying and control solutions are quite independent from the EMS and SCADA systems

  15. The spread of violent civil conflict : rare state-driven, and preventable

    E-Print Network [OSTI]

    Black, Nathan Wolcott

    2012-01-01

    This dissertation advances and tests an explanation for the spread of violent civil conflict from one state to another. The fear of such "substate conflict contagion" is frequently invoked by American policymakers as a ...

  16. CX-006813: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Targhee Substation Communication Equipment UpgradesCX(s) Applied: B1.15Date: 10/12/2011Location(s): Teton County, IdahoOffice(s): Bonneville Power Administration

  17. CX-010409: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of Cattle Guard at Western Area power Administration's Oracle Electrical Substation CX(s) Applied: B1.11 Date: 05/09/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  18. Microsoft Word - FCL Testing Report Final.doc

    Office of Environmental Management (EM)

    Southern California Edison territory due to an absence of 138kV substations. Part of the design criteria for the device is to reduce a fault from 63 kA to 40 kA. The design is...

  19. Carex sp. (Native) 5 

    E-Print Network [OSTI]

    Hugh D. Wilson

    2011-08-10

    Model ............................................... 11 2.4 Two-Stage State Estimation Algorithm......................................................... 13 2.5 Modeling of the Substation... ............................................................. 43 3.4.2 Simulation Result of WLS................................................................. 46 3.5 Conclusions ................................................................................................... 46 IV REMOTE...

  20. CX-007137: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam Lower 230-kilovolt Substation Service Building DemolitionCX(s) Applied: B1.23Date: 03/03/2011Location(s): Mohave County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  1. CX-006788: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Olympic Pipeline Company Fence Upgrade at South Tacoma SubstationCX(s) Applied: B1.11Date: 09/07/2011Location(s): Pierce County, WashingtonOffice(s): Bonneville Power Administration

  2. CX-012401: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Equipment Installations at Multiple Substations and Radio Facilities CX(s) Applied: B1.7 Date: 07/14/2014 Location(s): Washington, Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

  3. CX-010097: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Herbicide Application at Lone Butte Substation During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/24/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  4. CX-006280: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Gore Pass Substation Pole ReplacementCX(s) Applied: B1.3Date: 07/01/2011Location(s): Ground County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-012345: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Collbran Substation Conduit Installation and Breaker Replacement, Mesa County, Colorado CX(s) Applied: B4.6 Date: 06/03/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-012071: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Archer Substation Microwave Building Fiber Optic Installation CX(s) Applied: B4.7 Date: 04/29/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-010685: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Hayden Substation 230-kilovolt Tie Line CX(s) Applied: B4.6 Date: 07/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-012768: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Poncha Substation Access and Drainage Maintenance Chaffee County, Colorado CX(s) Applied: B1.3Date: 41880 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-012771: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Sinclair Substation License Outgrant, Carbon County, Wyoming CX(s) Applied: B1.24Date: 41838 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-010686: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-008792: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alliance Substation Communication Building Installation Box Butte County, Nebraska CX(s) Applied: B4.6 Date: 08/28/2011 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. Toward a Systematic Framework for Deploying Synchrophasors

    E-Print Network [OSTI]

    testing of the PMU based voltage stability monitor at TVA, also, Farrokh "Frank" Habibi on subsequent research and prototype implementation work of PMU based substation voltage controller for SCE

  13. iDSRT: Integrated Dynamic Soft Real-time Architecture for Critical Infrastructure Data

    E-Print Network [OSTI]

    Nahrstedt, Klara

    , network bandwidth and storage. For example, a Phasor Measurement Devices (PMU) in a power substation processor and sent over a wired/wireless LAN. End-to-end delay of PMU data has to be guaran- teed for real

  14. Presentation title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the transmission system. * A hub is the center of a zone. It represents a transmission substation where the zone's resources are collected and get onto the grid. * All of the...

  15. Maximum output at minimum cost

    E-Print Network [OSTI]

    Firestone, Jeremy

    Gamesa G90-2.0 MW #12;Maximum output at minimum cost per kWh for low wind sites ®® Class IIIA mast and the electrical substation. This innovative modular design based on TCP/IP architecture has

  16. ABBGroup-1-High voltage lab

    E-Print Network [OSTI]

    Basse, Nils Plesner

    to interrupt the current... Fault arc at a disconnector Fault arc in a substation #12;©ABBGroup-5- 3-Sep-07 of the physical processes · Optimisation of design through simulation · Reduction of development tests/costs

  17. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    the exclusive right to acquire the project from PPL Montana at "original cost less depreciation" in September to the substation at Anaconda. #12;·200 feet high ·381 feet long ·Generation Capacity of 196 MW ·On average

  18. Microsoft PowerPoint - WAPA Transmission Developments in NM ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    115 kV line, within Tri-State's existing corridor hosting the 115 between the Black Lake Substation & the Ojo Tap. 7 Southline 8 Centennial West - Clean Line Project The route of...

  19. 17.March.2005 1 Connection to the CERN Power System

    E-Print Network [OSTI]

    McDonald, Kirk

    electricity costs #12;17.March.2005 3 Characteristics of the load - power pulses (1 pulse every 30 min) -3.0E harmonic distortion - in addition: harmonic filtering for Meyrin at JURA substation Conclusion: No Problem

  20. IEEE TRANSACTIONS ON SIGNAL PROCESSING 1 Estimation of amplitude, phase and unbal-

    E-Print Network [OSTI]

    -Grid, voltage and current signals are analysed at substations by Phasor Measurement Units (PMUs). Technically, current signal analysis (CSA) is also used as a low-cost and non-invasive technique for fault detection

  1. Pressure [bar] ABBGroup-1-

    E-Print Network [OSTI]

    Basse, Nils Plesner

    to interrupt the current... Fault arc at a disconnector Fault arc in a substation #12;©ABBGroup-6- 18-Jun-08 of the physical processes · Optimisation of design through simulation · Reduction of development tests/costs

  2. SPPR Group Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from Hassayampa to Santa RosaTest Track * Conversion of 230-kV switchyard at Test Track Substation from Ring Bus to Breaker-and one-Half configuration and addition of a new bay...

  3. ANNEXURE-1 PRE-QUALIFICATION DOCUMENT CORRIGENDUM

    E-Print Network [OSTI]

    Udgaonkar, Jayant B.

    & Commissioning of 11 KV UG cable and allied civil works from BESCOM Substation to ICTS project site at Survey No, Subedarpalya, Malleshwaram, Bengaluru - 560 012. Cost of the document (non-refundable) shall be Rs. 3000

  4. Preprint of the paper "Analytical Integration Techniques for Earthing Grid Computation by Boundary

    E-Print Network [OSTI]

    Colominas, Ignasi

    . 08034 Barcelona, SPAIN. SUMMARY Analysis and design of substation earthing involves computing the equiva in the BEM formulation to reduce compu- tational cost. The anomalous asymptotic behaviour of this kind

  5. The Essentials for GA Water Planning The Relationship

    E-Print Network [OSTI]

    Rosemond, Amy Daum

    and may extend to 10-12 years. · The process is likely to cost each state millions in legal fees Measures 4. State & Substate Planning Structure 5. Institutional Powers & Authorities 6. Intergovernmental

  6. ABBGroup-1-High voltage lab

    E-Print Network [OSTI]

    Basse, Nils Plesner

    to interrupt the current... Fault arc at a disconnector Fault arc in a substation #12;©ABBGroup-5- 3-Sep-07 tests/costs A detailed understanding of arc physics and fluid dynamics is necessary for the development

  7. King Fahd University of Petroleum and Minerals

    E-Print Network [OSTI]

    Al-Ghadhban, Samir

    this reliability, continually safely and decrease the cost of connection, the connection between distribution substation and customer meter is divided into three configurations. There are three ways of connection: o

  8. Alive on Back-feed Culprit Identification via Machine Learning Bert Huang, Ansaf Salleb-Aouissi, Phil Gross

    E-Print Network [OSTI]

    Huang, Bert

    time lead directly to substantially reduced costs. Furthermore, these events occur when feed- ers;2 Alive on back-feed Topologically, a feeder cable is a tree-like structure, rooted at a substation, and

  9. SPPR Group Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from Hassayampa to DukeTest Track. Conversion of 230-kV switchyard at Test Track Substation from Ring Bus to Breaker-and-One-Half configuration and addition of new bays....

  10. Optimal Inverter VAR Control in Distribution Systems with High PV Penetration

    E-Print Network [OSTI]

    Low, Steven H.

    and the net benefits, taking into account the additional cost of inverter losses when operating at non the substation. Index Terms--Distribution systems, volt/var control, DC/AC inverter, optimal power flow

  11. A survey of intrusion detection in wireless network applications Robert Mitchell, Ing-Ray Chen

    E-Print Network [OSTI]

    Chen, Ing-Ray

    and maintenance costs, many of these systems are largely networked by wireless means. In order to identify gaps area or critical resource (power substation, water treat- ment plant, center of government). Malicious

  12. Load Forecasting using Fixed-Size Least Squares Support Vector Machines

    E-Print Network [OSTI]

    -SVM formulation, on the other hand, solves a linear sys- tem in dual space under a least-squares cost function [13 series comes from a local low voltage substation in Belgium and it contains 28,000 hourly values

  13. MA 15910 Lesson 10 Notes, Section 3.1 (2 half of text) Part 2 of ...

    E-Print Network [OSTI]

    Bailey, Charlotte M

    2014-09-24

    equivalent expression. Direct substation before simplifying may yield 0/0. 2. 3. 3. 3 .... Let C(t) be the cost to mail a letter in the year t. Find the following. (You will ...

  14. FACTSHEET: Next Generation Power Electronics Manufacturing Innovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    At a larger-scale, WBG semiconductors could help reduce the size of an 8,000 lbs. substation to 100 lbs. and the size of a suitcase - ultimately helping to lower the cost...

  15. CX-012756: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Curecanti Substation Access and Drainage Maintenance, Montrose County, Colorado CX(s) Applied: B1.3Date: 41845 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  16. DAMAGE DETECTION STRATEGIES IN STRUCTURAL HEALTH MONITORING OF OVERHEAD POWER TRANSMISSION SYSTEM

    E-Print Network [OSTI]

    Boyer, Edmond

    " refers to the low voltage part of T&D System that connects substations and consumers' switchgear boxes or underground), insulators, vibration dampers (e.g. Stockbridge type), switchgears and transformers. Due

  17. CX-005013: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installing Fiber Optic Cables Between Bonneville Power Administration?s Ashe Substation and Energy Northwest?s Columbia Generating Station Date: 01/05/2011Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration

  18. CX-007356: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration

  19. C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19-1B: Fish Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads Existing Public or Private Roads Airport City or Town Dam Urban Area County...

  20. C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19-1D: Fish Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads Existing Public or Private Roads Airport City or Town Dam Urban Area County...

  1. CX-011854: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Glen Canyon Substation 345 Kilovolt - Sulfur Hexafluoride and Concrete Pad Installation CX(s) Applied: B4.6 Date: 02/06/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  2. The Influence of Individuality, Age, and Season Upon the Weights of Fleeces Produced by Range Sheep. 

    E-Print Network [OSTI]

    Lush, Jay L. (Jay Laurence); Jones, J. M. (John McKinley)

    1923-01-01

    . WOOD, Inspector J. J. KELLY, Inspector J. D. PREWIT, B. S., Inspector 13. W. CARLETON, B. S., Inspector SUBSTATIONS No. 1. Beeville Bee County No. 10. College Station, Brazos County I. E. COWART,' XI. S., Superintendent ' (Feeding and Breeding...

  3. CX-009705: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  4. CX-012357: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Shiprock Substation Stormwater Erosion Control Maintenance, San Juan County, New Mexico CX(s) Applied: B1.33 Date: 07/01/2014 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-008705: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Upgrade of the Secondary Containment System at Bonneville Power Administration’s (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  6. CX-005129: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Upgrade of Secondary Containment Facilities at Hatwai SubstationCX(s) Applied: B4.6Date: 01/18/2011Location(s): Nez Perce County, IdahoOffice(s): Bonneville Power Administration

  7. CX-005132: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Upgrade of Secondary Containment Facilities at Dixie SubstationCX(s) Applied: B4.6Date: 01/24/2011Location(s): Elmore County, IdahoOffice(s): Bonneville Power Administration

  8. Real Time Grid Reliability Management 2005

    E-Print Network [OSTI]

    Eto, Joe

    2008-01-01

    on the August 14, 2003 Blackout in the United States and400 kV substation. The blackout affected 4.5 million peopleReasons of the East Coast US Blackout on August 14, 2003”,

  9. CX-012767: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Medicine Bow Substation Control Building Installation Project Carbon County, Wyoming CX(s) Applied: B1.22, B1.23Date: 41857 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-010337: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Garrison Substation Access Roads CX(s) Applied: B1.3, B1.13 Date: 05/28/2013 Location(s): Montana Offices(s): Bonneville Power Administration

  11. CX-000550: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Equipment Upgrades to Bull Shoals Dam SubstationCX(s) Applied: B4.6Date: 10/19/2009Location(s): Bull Shoals Dam, ArkansasOffice(s): Southwestern Power Administration

  12. EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

  13. CX-012743: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mead Substation Service Building Repairs CX(s) Applied: B1.3Date: 41879 Location(s): NevadaOffices(s): Western Area Power Administration-Desert Southwest Region

  14. Geothermal system saving money at fire station | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    A geothermal heating and cooling system has enabled the substation to save taxpayers 15,000 annually when compared to a traditional system. The high temperature of the treatment...

  15. Western Baldwin County, AL Grid Interconnection Project

    SciTech Connect (OSTI)

    Thomas DeBell

    2011-09-30

    The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

  16. USAJobs Search | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  17. Cogeneration Operational Issues 

    E-Print Network [OSTI]

    Williams, M.

    1985-01-01

    important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation...

  18. Digestion Experiments With Texas Feeding Stuffs. 

    E-Print Network [OSTI]

    Fraps, G. S.

    1914-01-01

    ............................................................................................................ .00 7.03 7.03 Cottonseed meal, average 1913................................................................................... 38.55 18.31 27.37 7050-1 Cottonseed meal... NO. 7: Spur, D ickens County R . E. D i c k s o n , B. S., Superintendent SUBSTATION NO. 8: Lubbock, Lubbock County V. L. C o r y , B. S., Superintendent SUBSTATION NO. 9: Pecos, Reeves County H . C. S t e w a r t , B . S ., Superintendent J...

  19. EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection with LVE's existing transmission system in northeastern Caribou County. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

  20. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  1. TWRS privatization phase 1 electrical power system

    SciTech Connect (OSTI)

    Singh, G.

    1997-05-30

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW).

  2. EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment DOE will prepare an EA to evaluate the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington.

  3. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative impact of this project on wildlife when combined with other proposed wind projects in the region. The low to high impacts to visual resources reflect the effect that the transmission line and the turbine strings from both wind projects would have on viewers in the local area, but this impact diminishes with distance from the project.

  4. Hot Springs-Garrison Fiber Optic Project

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

  5. CompensatorDPWM ADCe[n]d[n

    E-Print Network [OSTI]

    Prodiæ, Aleksandar

    is usually sized based on the energy storage requirement during large load transients [6 - MS SR vout(t) + - Optimal response circuit clk. divider & s.s. generator clk D fsw_f = kR(1-D) kR Fig.1: Adaptive switching frequency PWM controller regulating operation of a buck converter. ADAPTIVE

  6. A Control Strategy Scheme for Fuel Cell-Vehicle Based on Frequency Hamza Alloui

    E-Print Network [OSTI]

    Boyer, Edmond

    A Control Strategy Scheme for Fuel Cell-Vehicle Based on Frequency Separation Hamza Alloui based on frequency-separation for Fuel cell-Battery Hybrid Electric Vehicle (HEV), using a Fuel cell (FC of this strategy. Keywords ­ Fuel cell, hybrid source, battery, DC-DC Boost converter, Buck-boost converter

  7. Whither Nuclear Physics ?

    E-Print Network [OSTI]

    Syed Afsar Abbas

    2008-01-07

    Nuclear Physics has had its ups and downs. However in recent years, bucked up by some new and often puzzling data, it has become a potentially very rich field. We review some of these exciting developments in a few important sectors of nuclear physics. Emphasis shall be on the study of exotic nuclei and the new physics that these nuclei are teaching us.

  8. A STREAM PROCESSING APPROACH TO INTERACTIVE GRAPHICS ON CLUSTERS OF WORKSTATIONS

    E-Print Network [OSTI]

    Stanford University

    for the degree of Doctor of Philosophy. William J. Dally I certify that I have read this dissertation- ing committee, Bill Dally and Samuel P. Uselton (SPU), gave generously of their already overcommited enjoyable, especially Maneesh Agrawala, Ian Buck, Milton Chen, James Davis, Matthew Eldridge, Matt Everett

  9. Asia Times -Search Asia

    E-Print Network [OSTI]

    -tourism, now that its core business, hacking down what's left of the Java forests, has been taken away. But Jakarta is busy passing the buck by putting pressure on importing countries Sep 19, 2003 Letting Indonesia to the government for something by way of incentive to refocus to non- logging business activities, including eco

  10. Interstat Issue 21 

    E-Print Network [OSTI]

    1979-01-01

    about Starbuck's father comes to mind as the best. I wanted to know more about the ordinary citizens who make up the bulk of the Galactica fleet. I hope it gets picked up somehow, somewhere. Re Buck Rogers: What can I say? I thought I was the only one...

  11. Stephanie B. Aaronson Andrew T. Abbott

    E-Print Network [OSTI]

    Frantz, Kyle J.

    M. Corley Christopher Cormier James C. Covington Caroline E. Cox Abigail Cram Symone' E. Crawford. Buck Shaani K. Budram Michael N. Bui Kathryn L. Burnes Marilyn W. Burnett Ebony S. Burrowes Christa J Yoshika M. Christian Rachael W. Christiansen Marcus S. Chumley Michal Chwedczuk Edward T. Cieslak Alaina J

  12. Development of the Signals and Systems Concept Inventory (SSCI) Assessment

    E-Print Network [OSTI]

    Wage, Kathleen

    31st ASEE/IEEE Frontiers in Education Conference F2A-2 DEVELOPMENT OF THE SIGNALS AND SYSTEMS CONCEPTDevelopment of the Signals and Systems Concept Inventory (SSCI) Assessment Instrument Kathleen E. Wage and John R. Buck October 2001 Proceedings of the 31st ASEE/IEEE Frontiers in Education Conference

  13. 111-f:l.~A PfC, qs: Hoo control of boost converters

    E-Print Network [OSTI]

    ,I-.; ... 111- f:l.~A PfC, qs: f'EEEin !f Hoo control of boost converters Rami NAIM, George WEISS at low frequencies). In a case study, for a typical low power boost converter, we obtain significantly\\vitching frequency. Boost and buck-boost converters (in continuous conduction mode) have a zero in the right half

  14. Series Input Modular Architecture for Driving Multiple LEDs

    E-Print Network [OSTI]

    regulation is provided using a prototype of the proposed system with four series buck- boost converter cells, zane}@colorado.edu Abstract ­ This paper introduces a modular power converter architecture based on series input connected converter cells with independent outputs that each drive a small series string

  15. International Journal of Bifurcation and Chaos, Vol. 17, No. 5 (2007) 16091622 c World Scientific Publishing Company

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    2007-01-01

    the interaction of fast-scale and slow-scale bifurcations in the boost converter under current-mode control is a widely used control method for dc/dc converters, especially for the boost and buck-boost types of dc, as reported in [Iu & Tse, 2001] for parallel boost converters, [Wong et al., 2006] for noise-coupled boost

  16. Designing an Accurate and Robust LC-Compliant Asynchronous Boost DCDC Converter

    E-Print Network [OSTI]

    Rincon-Mora, Gabriel A.

    Designing an Accurate and Robust LC-Compliant Asynchronous Boost DC­DC Converter Neeraj Keskar in buck converters, little has been done in boosting applications. This paper presents an asynchronous boost converter and describes how LC variations affect stability, steady-state error, and switching

  17. IEEE Industry Applications Society Annual Meeting

    E-Print Network [OSTI]

    Al-Duwaish, Hussain N.

    for the notation and descriptionof a buck-boost DC-DC converter with resistive load, the A,,A,, B,,B2,and C Power Converters Circuit vo ZakariyaAl-Hamouz, Hussain Al-Duwaish and Ibrahim El-Amin Electrical-3535 E-mail:zhamouz@dpc.kfupm.edu.sa Power converters often consist of linear circuits that are switched

  18. Stability Analysis of Complete Two-Stage Power-Factor-Correction Power Supplies

    E-Print Network [OSTI]

    Tse, Chi K. "Michael"

    - versity under internal allocation G-YE04. dc/dc buck converter boost PFC pre-regulator average current-stage cascade struc- ture, consisting of a PFC preregulator and a dc/dc converter. Previous studies of the dynamical be- haviour mainly focused on the boost PFC prereg- ulator, assuming that it is being terminated

  19. Coupled Dual Interleaved Flyback Converter for High Input Voltage Application

    E-Print Network [OSTI]

    Lehman, Brad

    proposed integrated boost converters [7] that are beginning to see applications in automotive power buck-boost (Flyback) power converter [9,10] that utilizes one magnetic core to integrate two FlybackCoupled Dual Interleaved Flyback Converter for High Input Voltage Application Ting Qian, Brad

  20. Low-Volume Power Supply for Vehicular Fuel Injection Systems

    E-Print Network [OSTI]

    Prodiæ, Aleksandar

    . Conventionally, the injectors are supplied by voltage step-up, boost converters [3], commonly called injector tight output voltage regulation. To meet both requirements, the boost converter is often over topology, combining boost and non-inverting buck-boost phases regulated by a digital load