  1. Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority

    Broader source: Energy.gov [DOE]

    Application from British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmission facilities at the U.S. - Canada...

  2. PP-22-4 British Columbia Transmission Corporation

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Transmission Corporation to construct, operate, and mantain electric transmission facilities at the U.S-Canadian border.

  3. Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78- Apr. 24, 2007

    Broader source: Energy.gov [DOE]

    Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal...

  4. PP-22 British Columbia Electric Company, Limited

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

  5. British Columbia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    it. British Columbia is a province in Canada. Energy Incentives for British Columbia Energy Monitoring Act (Canada) Western Interstate Nuclear Compact State Nuclear Policy...

  6. PP-22 British Columbia Electric Company, Limited, Amendment 1957

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

  7. PP-22-1 British Columbia Electric Company, Limited

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

  8. PP-369 British Columbia Hydro and Power Authority

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing British Columbia and Power Authority to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  9. PP-369 British Columbia Hydro and Power Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-369 British Columbia Hydro and Power Authority PP-369 British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia and Power Authority to...

  10. British Columbia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Incentives for British Columbia Energy Monitoring Act (Canada) Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) References http:...

  11. British Columbia UILO | Open Energy Information

    Open Energy Info (EERE)

    UILO Jump to: navigation, search Name: British Columbia UILO Place: Canada Sector: Services Product: General Financial & Legal Services ( Academic Research foundation )...

  12. Application for Presidential Permit OE Docket No. PP-369 British...

    Office of Environmental Management (EM)

    Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application from British Columbia ...

  13. PP-22 British Columbia Hydro and Power Authority, Amendment 1967

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmision facilities at the U.S-Canadian border.

  14. EA-145-A British Columbia Power Exchange Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-145-A British Columbia Power Exchange Corporation (16.02 KB) More Documents & Publications EA-184 Morgan Stanley Capital Group Inc. EA-171-A Powerex EA-167 PG&E Energy Trading-P...

  15. Three Pacific Coast States Join British Columbia to Combat Climate Change

    Broader source: Energy.gov [DOE]

    California, Oregon, Washington, and British Columbia signed a regional agreement to strategically align policies to reduce greenhouse gas emissions and promote clean energy.

  16. Quality of Wood Pellets Produced in British Columbia for Export

    SciTech Connect (OSTI)

    J. S. Tumuluru; S. Sokhansanj; C. J. Lim; T. Bi; A. Lau; S. Melin; T. Sowlati; E. Oveisi

    2010-11-01

    Wood pellet production and its use for heat and power production are increasing worldwide. The quality of export pellets has to consistently meet certain specifications as stipulated by the larger buyers, such as power utilities or as specified by the standards used for the non-industrial bag market. No specific data is available regarding the quality of export pellets to Europe. To develop a set of baseline data, wood pellets were sampled at an export terminal in Vancouver, British Columbia, Canada. The sampling period was 18 months in 2007-2008 when pellets were transferred from storage bins to the ocean vessels. The sampling frequency was once every 1.5 to 2 months for a total of 9 loading/shipping events. The physical properties of the wood pellets measured were moisture content in the range of 3.5% to 6.5%, bulk density from 728 to 808 kg/m3, durability from 97% to 99%, fines content from 0.03% to 0.87%, calorific value as is from 17 to almost 18 MJ/kg, and ash content from 0.26% to 0.93%.The diameter and length were in the range of 6.4 to 6.5 mm and 14.0 to 19.0 mm, respectively. All of these values met the published non-industrial European grades (CEN) and the grades specified by the Pellet Fuel Institute for the United States for the bag market. The measured values for wood pellet properties were consistent except the ash content values decreased over the test period.

  17. QUALITY OF WOOD PELLETS PRODUCED IN BRITISH COLUMBIA FOR EXPORT

    SciTech Connect (OSTI)

    Tumuluru, J.S.; Sokhansanj, Shahabaddine; Lim, C. Jim; Bi, X.T.; Lau, A.K.; Melin, Staffan; Oveisi, E.; Sowlati, T.

    2010-11-01

    Wood pellet production and its use for heat and power production are increasing worldwide. The quality of export pellets has to consistently meet certain specifications as stipulated by the larger buyers, such as power utilities or as specified by the standards used for the non-industrial bag market. No specific data is available regarding the quality of export pellets to Europe. To develop a set of baseline data, wood pellets were sampled at an export terminal in Vancouver, British Columbia, Canada. The sampling period was 18 months in 2007-2008 when pellets were transferred from storage bins to the ocean vessels. The sampling frequency was once every 1.5 to 2 months for a total of 9 loading/shipping events. The physical properties of the wood pellets measured were moisture content in the range of 3.5% to 6.5%, bulk density from 728 to 808 kg/m3, durability from 97% to 99%, fines content from 0.03% to 0.87%, calorific value as is from 17 to almost 18 MJ/kg, and ash content from 0.26% to 0.93%.The diameter and length were in the range of 6.4 to 6.5 mm and 14.0 to 19.0 mm, respectively. All of these values met the published non-industrial European grades (CEN) and the grades specified by the Pellet Fuel Institute for the United States for the bag market. The measured values for wood pellet properties were consistent except the ash content values decreased over the test period.

  18. PP-230-1 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 International Transmission Company PP-230-1 International Transmission Company Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, ...

  19. Assessment of mercury emissions from the Afton copper smelter, British Columbia, Canada

    SciTech Connect (OSTI)

    Robertson, J.D.; Price, C.J.

    1986-07-01

    The afton Copper Smelter adjacent to Kamloops, British Columbia, Canada commenced operation in 1978 and employed a mercury scrubbing system. Two years of preproduction studies, which included monitoring for mercury in ambient air, water, soil, and vegetation were performed. The results from similar studies conducted during four full years (1978-81) and two partial years (1982-83) of production are presented in the data analysis. These programs illustrated that the most frequent ground impingement occurred within a 1.6-3.2-km radius of the source, and that the levels decreased with increasing distance from the source to a maximum radius of 8 km. The results of a comprehensive source monitoring program illustrated that the average mercury emission levels ranged from 3.2 to 6.8 kg/calendar day during 1979-81, and that the majority of the emissions were in a vapor form. The ambient monitoring data acquired when smelter operations were significantly reduced indicate a quick recovery to preproduction levels in virtually all monitored parameters and at most monitored sites. The integrated results from all mercury monitoring programs illustrate the environmental impact from mercury emissions which were two to four times the permit standard of 1.8 kg/day.

  20. Accounting for social impacts and costs in the forest industry, British Columbia

    SciTech Connect (OSTI)

    Gale, Robert . E-mail: rgale@web.net; Gale, Fred . E-mail: fred.gale@utas.edu.au

    2006-03-15

    Business reviews of the forest industry in British Colombia, Canada, typically portray an unequivocally positive picture of its financial and economic health. In doing so, they fail to consider the following six categories of social impacts and costs: (1) direct and indirect subsidies; (2) government support through investment; (3) community dependence; (4) the maintenance of public order; (5) aboriginal title; and (6) the overestimation of employment. Our findings show that conventional economic and financial accounting methods inflate the industry's net contribution to the economy. We make a number of recommendations to address this shortcoming to improve future accounting and reporting procedures.

  1. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  2. EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

  3. Population-Based Study of Cardiovascular Mortality Among Patients With Prostate Cancer Treated With Radical External Beam Radiation Therapy With and Without Adjuvant Androgen Deprivation Therapy at the British Columbia Cancer Agency

    SciTech Connect (OSTI)

    Kim, Julian; Vaid, Moninder; Tyldesley, Scott; Woods, Ryan; Pickles, Tom

    2011-07-01

    Purpose: There are conflicting studies of the impact of androgen deprivation therapy (ADT) on cardiovascular (CV) mortality among prostate cancer patients receiving curative intent external beam radiation therapy (EBRT). We assessed the impact of ADT on CV mortality in patients treated in British Columbia. Methods and Materials: Provincial pharmacy and radiotherapy databases were linked to the provincial cancer registry, and defined a cohort of patients treated with curative intent EBRT between 1998 and 2005. We determined the duration of ADT and the cumulative incidence of CV death. We compared death from CV disease with and without ADT, and by duration of ADT using competing risk analysis and Fine and Gray multivariant analysis. A total of 600 randomly selected patients were reviewed to determine baseline CV disease, CV risk factors, and Charlson Index. Results: Of 5,948 prostate cancer patients treated with radical intent EBRT, of whom 1,933 were treated without ADT, 674 received ADT for {<=}6 months and 3,341 received > 6 months of ADT. The cumulative CV mortality at 7 years was 2.6% (95% confidence interval [CI] 1.9-3.5%), 2.1% (95% CI = 1.2-3.5%), and 1.4 (95% CI = 1.0-2.0%) for patients with no ADT, {<=}6 months of ADT, and >6 months of ADT, respectively (Gray's p = 0.002). Baseline CV disease and risk factors were more prevalent in the no-ADT group compared with the >6-month ADT group. Conclusions: This study demonstrated a lower CV mortality rate among patients treated with longer durations of ADT than those treated without ADT. These differences likely relate to selection of patients for ADT rather than effect of ADT itself.

  4. Washington/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Avista, Pacificorp, Puget Sound Energy, Tacoma Public Utilities, Bonneville Power Administration, Columbia Grid, Northern Tier Transmission Group, and Seattle City...

  5. Survey of Columbia River Basin Streams for Giant Columbia River Spire Snail Fluminicola columbiana and Great Columbia River limpet Fisherola nuttalli

    SciTech Connect (OSTI)

    Neitzel, D.A.; Frest, T.J.; Washington Univ., Seattle, WA )

    1989-10-01

    Surveys have confirmed the survival of both the giant Columbia River spire snail Fluminicola columbiana and the great Columbia River limpet Fisherola nuttalli in the Hanford Reach of the Columbia River, Washington State, as well as other sites in Washington, Oregon, and Idaho. A review of historical collection records suggests that both species exist in still other sites of the Columbia River Basin. At present, there is insufficient information to allow adequate appraisal of either species relative to possible federal or state listing as endangered or threatened species. The results of our studies suggest that additional undiscovered populations of both species exist. There is a relatively good chance that pristine habitat required by spire snails and limpets remains in 37 streams or portions of streams in Washington, Oregon, Idaho, and Montana (British Columbia was considered outside the project scope). For a thorough survey, visits to more than 600 sites will be required. 20 refs., 5 figs., 7 tabs.

  6. Microsoft PowerPoint - 2015-06-18 Corps Columbia Riverkeeper...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Columbia River Power System Generation & Transmission - System Map The FCRPS 31 dams 21 Corps ... at Corps of Engineer labs and the Hydroelectric Design Center. ...

  7. Columbia River Treaty History and 2014/2024 Review

    SciTech Connect (OSTI)

    2009-02-01

    The Columbia River, the fourth largest river on the continent as measured by average annual flow, generates more power than any other river in North America. While its headwaters originate in British Columbia, only about 15 percent of the 259,500 square miles of the Columbia River Basin is actually located in Canada. Yet the Canadian waters account for about 38 percent of the average annual volume, and up to 50 percent of the peak flood waters, that flow by The Dalles Dam on the Columbia River between Oregon and Washington. In the 1940s, officials from the United States and Canada began a long process to seek a joint solution to the flooding caused by the unregulated Columbia River and to the postwar demand for greater energy resources. That effort culminated in the Columbia River Treaty, an international agreement between Canada and the United States for the cooperative development of water resources regulation in the upper Columbia River Basin. It was signed in 1961 and implemented in 1964.

  8. Oregon/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Electric Cooperative, Columbia Grid, Northern Tier Transmission Group, and Bonneville Power Administration. Oregon Energy Policy The Oregon Department of Energy's Governor's...

  9. District of Columbia - Compare - U.S. Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    (EIA) District of Columbia District of Columbia

  10. District of Columbia - Rankings - U.S. Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    (EIA) District of Columbia District of Columbia

  11. District of Columbia - Search - U.S. Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    (EIA) District of Columbia District of Columbia

  12. British Biogen | Open Energy Information

    Open Energy Info (EERE)

    search Name: British Biogen Place: London, United Kingdom Zip: SW1X 8PQ Sector: Bioenergy Product: British BioGen is the Trade Association to the UK Bioenergy Industry....

  13. Columbia River Treaty 2014/2024 Review Phase 1 Report

    SciTech Connect (OSTI)

    2010-07-01

    Under the Columbia River Treaty (Treaty or CRT) of 1964, Canada and the United States (U.S.) jointly regulate and manage the Columbia River as it flows from British Columbia into the U.S. The Treaty has provided substantial flood control and power generation benefits to both nations. The Treaty established Canadian and U.S. Entities as implementing agents for each government. British Columbia Hydro and Power Authority (BC Hydro) was designated as the Canadian Entity. The Bonneville Power Administration (BPA) Administrator and the U.S. Army Corps of Engineers (Corps) Division Engineer, Northwestern Division, were designated as the U.S. Entity. The Canadian and U.S. Entities are empowered by their respective governments with broad discretion to implement the existing Columbia River Treaty. They are not, however, authorized to terminate, renegotiate, or otherwise modify the Treaty. In the U.S., authority over international treaties rests with the President, assisted in foreign relations and international negotiations by the Department of State and subject in certain cases to the advice and consent of the U.S. Senate. In Canada, international treaties are within the prerogative of the executive branch of the federal government. Under current policy, treaties are tabled in the House of Commons, and are subject to a waiting period before the executive branch brings the treaty into effect. In the case of the Columbia River Treaty, Canada has assigned certain rights and obligations relating to the Treaty to British Columbia pursuant to the Canada-B.C. Agreement. The Phase 1 report is provided to those respective governmental bodies to support possible independent and/or joint decisions that may be made with respect to the future of the Treaty. The Treaty contains two important provisions that take effect on and after September 16, 2024, that could impact the current power and flood control benefits: 1. Canadian flood control obligations automatically change from a pre

  14. British nuclear policymaking

    SciTech Connect (OSTI)

    Bowie, C.J.; Platt, A.

    1984-01-01

    This study analyzes the domestic political, economic, and bureaucratic factors that affect the nuclear policymaking process in Great Britain. Its major conclusion is that, although there have been changes in that process in recent years (notably the current involvement of a segment of the British public in the debate about the deployment of intermediate-range nuclear forces), future British nuclear policymaking will remain much what it has been in the past. Three ideas are central to understanding British thinking on the subject: (1) Britain's long-standing resolve to have her own national nuclear force is largely traceable to her desire to maintain first-rank standing among the nations of the world in spite of loss of empire. (2) Financial considerations have always been important--so much so that they have usually dominated issues of nuclear policy. (3) The executive branch of government dominates the nuclear policymaking process but does not always present a united front. The United States heavily influences British nuclear policy through having supplied Britain since the late 1950s with nuclear data and components of nuclear weapon systems such as Polaris and Trident. The relationship works both ways since the U.S. depends on Britain as a base for deployment of both conventional and nuclear systems.

  15. British coal privatization procedures

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The form in which British Coal is to be privatized has finally been announced. Offers are to be invited for the operating underground and opencast mines which will be grouped into five regionally based companies. Additionally, offers will be invited for a number of collieries which are currently under care and maintenance. The five Regional Coal Companies to be formed are Central North, which will comprise the assets in the Yorkshire and Durham coalfields, including the five collieries in the Selby Complex; Central South, which will contain the assets located in the Nottinghamshire, Leicestershire, Derbyshire, and Warwickshire coalfields; North East, which has four opencast sites, Scotland, which has nine operating open-cast sites and a single underground mine, Longannet; and South Wales with its nine operating opencast sites. Tower colliery, the last underground mine in South Wales, was finally put on care and maintenance on April 20, 1994. Details of the five Regional Coal Companies are given. A new public sector body, the Coal Authority will be set up to which all British Coal's title to unworked coal and coal mines will be transferred. All the relevant property rights and liabilities of British Coal will be transferred into the Regional Coal Companies prior to their sun.

  16. Columbia Estuary Ecosystem Restoration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia Estuary Ecosystem Restoration Program Finding of No Significant Impact page 1 Columbia Estuary Ecosystem Restoration Program Finding of No Significant Impact Bonneville Power Administration DOE/EA-2006 July 2016 SUMMARY Bonneville Power Administration (BPA) announces its environmental findings for the Columbia Estuary Ecosystem Restoration Program. The ongoing program, implemented by BPA and United States Army Corps of Engineers (Corps), involves activities and projects to restore

  17. British Hydropower Association | Open Energy Information

    Open Energy Info (EERE)

    British Hydropower Association Place: Wimborne, Dorset, United Kingdom Zip: BH21 1QU Sector: Hydro Product: The British Hydropower Association (BHA) is a trade association which...

  18. British Energy Renewables | Open Energy Information

    Open Energy Info (EERE)

    Energy, Wind energy Product: Renewables division of British Energy. Involved in the Lewis Wind Farm project. References: British Energy Renewables1 This article is a stub....

  19. Columbia Boulevard Wastewater Treatment Plant

    SciTech Connect (OSTI)

    2005-08-01

    This is a combined heat and power (CHP) project profile on 320 kW fuel cell and microturbine power plants at Columbia Boulevard Wastewater Treatment Plant in Portland, Oregon.

  20. Columbia Water & Light- Solar Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water & Light electric customers are eligible for a $400 rebate for the purchase of a new solar water heater. To apply for this rebate, a customer submits a pre-approval application to...

  1. District of Columbia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    (District of Columbia) Glacial Energy Holdings (District of Columbia) Hess Retail Natural Gas and Elec. Acctg. (District of Columbia) Integrys Energy Services, Inc. (District...

  2. Technology Solutions for New Homes Case Study: Columbia County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia County Habitat for Humanity Passive Townhomes Technology Solutions for New Homes Case Study: Columbia County Habitat for Humanity Passive Townhomes The Columbia County ...

  3. Building America Case Study: Columbia County Habitat for Humanity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia County Habitat for Humanity Passive Townhomes Hudson, New York PROJECT INFORMATION Project Name: Columbia Passive Townhomes II Location: Hudson, NY Partners: Columbia ...

  4. ColumbiaGrid Forum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 National Electric Transmission Congestion Study Workshop Marv Landauer December 13, 2011 2 Northwest Congestion 2006 DOE Congestion Study identified: * "Seattle to Portland" as a Congestion area of Concern * Montana-Wyoming as a Conditional Congestion Area due to potential for coal and wind resource development * Projects are being pursued to relieve Seattle to Portland congestion (Castle Rock-Troutdale line) and Montana-NW congestion (Colstrip Upgrades) 3 Northwest Congestion

  5. Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

  6. British Photovoltaic Association | Open Energy Information

    Open Energy Info (EERE)

    Photovoltaic Association Jump to: navigation, search Name: British Photovoltaic Association Place: Milton Keynes, United Kingdom Zip: MK5 8NG Product: Trade body for the PV...

  7. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) prepared an EA to assess the potential environmental impacts of the Northern Mid-Columbia Joint Project, a 230-kilvolt transmission line proposed by BPA and the Public Utility Districts of Grant, Chelan, and Douglas Counties, Washington.

  8. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  9. City of Columbia- Renewable Portfolio Standard

    Broader source: Energy.gov [DOE]

    In November 2004, voters in Columbia, Missouri, approved* a proposal to adopt a local renewable portfolio standard (RPS). (The state renewable electricity standard adopted by ballot initiative in...

  10. Columbia Water & Light- Residential HVAC Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water & Light (CWL) provides residential customers with rebates on energy efficient HVAC equipment. Customers should submit the mechanical permit from a Protective Inspection, a copy...

  11. Columbia Utilities Electricity | Open Energy Information

    Open Energy Info (EERE)

    Electricity Jump to: navigation, search Name: Columbia Utilities Electricity Place: New York Phone Number: (877) 726-5862 Website: www.columbiautilities.com Twitter:...

  12. District of Columbia | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    District of Columbia Denise Peoples honored for 30 years of service Four sworn in as NNSA's newest members of the Senior Executive Service corps NNSA Headquarters

  13. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  14. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  15. U. 5. COLUMBIA RIVER POWER SYS1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12,800,000 to the reclamation fund in the United States Treasury for the account of Columbia Basin Project, Yakima Project...

  16. Washington Nuclear Profile - Columbia Generating Station

    U.S. Energy Information Administration (EIA) Indexed Site

    Columbia Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration ...

  17. Columbia, Missouri: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Missouri. It falls under Missouri's 9th congressional district.12 Registered Energy Companies in Columbia, Missouri AFuels Technologies LLC Renewable Alternatives LLC...

  18. Columbia Gas of Ohio- Residential Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia Gas of Ohio (CGO) offers energy efficiency rebates for furnaces, boilers, and customers that enroll in the Home Performance Solutions Program. 

  19. Columbia Water & Light- Solar Energy Loans

    Broader source: Energy.gov [DOE]

    Columbia Water & Light (CWL) offers electric residential and commercial customers low-interest loans for photovoltaic (PV) systems and solar water heaters.

  20. Pay-As-You-Drive Pricing in British Columbia | Open Energy Information

    Open Energy Info (EERE)

    build a successful LEDS. How to Use This Tool This tool is most helpful when using these strategies: Avoid - Cut the need for travel Improve - Enhance infrastructure & policies...

  1. Demand forecasting and revenue requirements, with implications for consideration in British Columbia

    SciTech Connect (OSTI)

    Acton, J.P.

    1983-05-01

    This paper was filed as an exhibit on behalf of The Consumers' Association of Canada (B.C. Branch), The Federated Anti-Poverty Groups of B.C., The Sierra Club of Western Canada, and the B.C. Old Age Pensioners' Organization. It was subjected to cross-examination on October 29, 1982, during Phase I of the hearings. The Utilities Commission had designated Phase I for consideration of (1) demand, (2) assets in service, (3) revenue requirements excluding return, and (4) financing and capital requirements. This paper presents a general discussion of the elements of a rate structure and their relationship to the demand for electricity, a systematic review of some 50 empirical studies of the demand for electricity as a function of price and other factors by the three principal classes of customers, and a discussion of the notion of revenue requirements. The paper should be of interest to utility regulators, rate specialists, and forecasters for its review of demand models and to academics concerned with the study of energy demand.

  2. British Wind Energy Association BWEA | Open Energy Information

    Open Energy Info (EERE)

    BWEA Jump to: navigation, search Name: British Wind Energy Association (BWEA) Place: London, United Kingdom Zip: N1 0PW Sector: Wind energy Product: The British Wind Energy...

  3. Columbia River PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to commercial and industrial customers who make energy saving improvements to facilities. Visit Columbia River PUD's website for specific program...

  4. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas...

    Office of Environmental Management (EM)

    5: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, ...

  5. Hess Retail Natural Gas and Elec. Acctg. (District of Columbia...

    Open Energy Info (EERE)

    Hess Retail Natural Gas and Elec. Acctg. (District of Columbia) Jump to: navigation, search Name: Hess Retail Natural Gas and Elec. Acctg. Place: District of Columbia References:...

  6. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, ...

  7. Washington Gas Energy Services (District of Columbia) | Open...

    Open Energy Info (EERE)

    Washington Gas Energy Services (District of Columbia) Jump to: navigation, search Name: Washington Gas Energy Services Place: District of Columbia References: EIA Form EIA-861...

  8. Columbia County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype C. Places in Columbia County, Oregon Clatskanie, Oregon Columbia City, Oregon Prescott, Oregon Rainier, Oregon Scappoose, Oregon St. Helens, Oregon Vernonia, Oregon...

  9. Noble Americas Energy Solutions LLC (District of Columbia) |...

    Open Energy Info (EERE)

    District of Columbia) Jump to: navigation, search Name: Noble Americas Energy Solutions LLC Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 -...

  10. Columbia County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Places in Columbia County, Georgia Evans, Georgia Grovetown, Georgia Harlem, Georgia Martinez, Georgia Retrieved from "http:en.openei.orgwindex.php?titleColumbiaCounty,Geor...

  11. DOE - Office of Legacy Management -- Teledyne-Columbia-Summerville...

    Office of Legacy Management (LM)

    Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Columbia Steel, Summerill Tube, Columbia-Summerill PA.01-1 Location: Pittsburgh , ...

  12. Devonshire Energy, LLC (District of Columbia) | Open Energy Informatio...

    Open Energy Info (EERE)

    Devonshire Energy, LLC (District of Columbia) Jump to: navigation, search Name: Devonshire Energy, LLC Place: District of Columbia References: EIA Form EIA-861 Final Data File for...

  13. Columbia Water & Light- Home Performance with ENERGY STAR Loan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Columbia Water & Light (CWL) Home Performance with ENERGY STAR program allows Columbia residents to finance energy efficiency improvements to homes with affordable, low-interest loans with...

  14. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  15. British American Business | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    British American Business British American Business November 20, 2007 - 4:45pm Addthis Remarks as Prepared for Secretary Bodman Thank you. It's a pleasure to be back speaking to the members of British-American Business. I want to thank Peter Hunt for convening this event and for inviting me to be a part of it. I'm winding up a trip that began in Rome at the World Energy Conference where I and six of my fellow Energy Ministers from around the world shared our views on how to increase the world's

  16. Jonathan Link, Columbia NuCosmo '02

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7-19, 2002 Jonathan Link, Columbia NuCosmo '02 Jonathan Link Columbia University Workshop on Neutrino News from the Lab and the Cosmos October 17-19, 2002 October 17-19, 2002 Jonathan Link, Columbia NuCosmo '02 Outline 1. The LSND Experiment a. The experimental setup b. Results c. Ramifications 2. MiniBooNE a. The BooNE Collaboration b. The beam line and expected neutrino flux c. The MiniBooNE detector d. Expected backgrounds and systematics e. First neutrino events, and cosmic rays f.

  17. Jonathan Link, Columbia KEK Topical Conference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -22, 2001 Jonathan Link, Columbia KEK Topical Conference Short Baseline Neutrino Oscillations and MiniBooNE Jonathan Link Columbia University The 5 th KEK Topical Conference - Frontiers in Flavor Physics November 20-22, 2001 November 20-22, 2001 Jonathan Link, Columbia KEK Topical Conference Outline 1. Background on Short Baseline Neutrino Oscillations * A little neutrino physics * The LSND oscillation result 2. About MiniBooNE 3. Status of MiniBooNE. Some of you may have noticed that I'll be

  18. 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electricity transmission, and power storage. The team, which includes scientists from Cambridge University, the University of British Columbia, and the National High Magnetic Field...

  19. Application to Amend Presidential Permit OE Docket No. PP-022...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application to Amend ...

  20. BPA research aids Columbia River white sturgeon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    research aids Columbia River white sturgeon 8142015 12:00 AM Tweet Page Content BPA fish biologist Scott Bettin (left) and Brad Cady of the Washington Dept. of Fish and...

  1. Columbia Power System | Open Energy Information

    Open Energy Info (EERE)

    931-388-4833 Website: www.cpws.com Facebook: https:www.facebook.compagesColumbia-Power-Water-Systems123897314290346 Outage Hotline: 931-388-4833 References: EIA Form...

  2. Mid-Columbia Region Clean Energy Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    93 -VA Revision 0 Mid-Columbia Region Clean Energy Opportunities Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, ...

  3. Columbia River Component Data Gap Analysis

    SciTech Connect (OSTI)

    L. C. Hulstrom

    2007-10-23

    This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

  4. Director, health Physics Office Columbia University

    Office of Legacy Management (LM)

    f. 3 -J Mr. Philip tori0 Director, health Physics Office Columbia University 289 Engineering Terrace 520 West 120th Street New York, New York 10027 NY.3 "I A\, 4 f- ' :""5 . . ;. ,_ i._ ' L, Dear Mr. Lorio: The Department of Energy (DOE), as part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), has reviewed information on Columbia University facilities to determine whether they contain residual radioactivity traceable to activities conducted on behalf of the

  5. Columbia University | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Columbia University Columbia University Professor Michael Mauel PPPL Engineer Steve Raftopoulos assisted Professor Mike Mauel with the upgrade of the HBT-EP experiment. The upgrade involved installing a new conducting first wall shell that is instrumented with magnetic sensor arrays. The HBT-EB research required these components to be installed with greater precision, and Professor Mauel asked for the assistance of PPPL's metrology engineers and equipment. The stabilization of MHD in HBT-EB will

  6. 2006 Final Transmission Proposal: Revenue Requirements Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the

  7. OSTIblog Articles in the british library Topic | OSTI, US Dept of Energy

    Office of Scientific and Technical Information (OSTI)

    Office of Scientific and Technical Information british library

  8. The Columbia River System : the Inside Story.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  9. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwest—from fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the region’s electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  10. Bonneville Power Administration- The Power of The Columbia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power of the Columbia Our site is here to showcase the mighty Columbia River. We'll explore some of the history, beauty and magnificence of the northwest's great natural resource,...

  11. Columbia Power Technologies, Inc. Deploys its Direct Drive Wave...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy April 9, 2013 - 12:00am ...

  12. Adams-Columbia Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Adams-Columbia Electric Coop Jump to: navigation, search Name: Adams-Columbia Electric Coop Place: Wisconsin Phone Number: 800-831-8629 Website: www.acecwi.com Twitter: @ACECWI...

  13. Transmission Workshop

    Broader source: Energy.gov [DOE]

    On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC.

  14. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT) The Grid Tech Team ... regional diversity, AC-DC transmission and distribution solutions, ...

  15. Response of the District of Columbia Public Service Commission | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy of the District of Columbia Public Service Commission Response of the District of Columbia Public Service Commission Docket No. EO-05-01: Response of the District of Columbia Public Service Commission ("DCPSC") to submissions made in this proceeding by Robert G. Burnley, Director of the Commonwealth of Virginia Department of Environmental Quality and the City of Alexandria. Response of the District of Columbia Public Service Commission (7.17 MB) More Documents &

  16. Alternative Fuels Data Center: District of Columbia Transportation Data for

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Alternative Fuels and Vehicles District of Columbia Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: District of Columbia Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: District of Columbia Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: District of Columbia Transportation Data for Alternative Fuels and

  17. CERTIFICATION DOCKET FOR COLUMBIA UNIVERSITY NEW YORK, NEW YORK

    Office of Legacy Management (LM)

    COLUMBIA UNIVERSITY NEW YORK, NEW YORK Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Introduction to the Certification Docket for Columbia University, New York, New York Purpose Docket Contents Exhibit I: Summary of Activities at the Columbia University, New York, New York Exhibit II: Documents Supporting the Certification of the Columbia University, New York, New York Page I-l II- 1 . . . 111

  18. Transmission decisions

    SciTech Connect (OSTI)

    Ellison, C.T. )

    1993-03-01

    As the US FERC moves forward to implement the transmission access provisions of the National Energy Policy Act of 1992, the debate over Regional Transmission Groups continues. Independent energy producers have much at stake in this debate and their reaction to the general RTG concept and to specific RTG proposals will weigh heavily in determining the fate of these proposals.

  19. Competition law and British natural gas regulation

    SciTech Connect (OSTI)

    Black, A.J.

    1992-01-01

    British Gas (BG) is a seriously successful monopolist which, since its 1986 privatisation, is acing increased regulation by the Office of Gas Supply (OFGAS). OFGAS is the first public body specifically created to regulate a European gas industry. It employs a rate-capping formula instead of the more labour intensive rate-of-retum method favoured in North America. Despite initial criticisms, OFGAS has surprised industry observers with efficacious results. This article succinctly discusses the process of natural gas industry privatisation in the United Kingdom (U.K.) and the development of a British type of [open quotes]open access.[close quotes] Contemporary British gas regulation is a distinct paradigm involving the privatisation of a vertically integrated pipeline system coupled with an altemative regulatory method. These regulatory results include lower prices for core customers and the promotion of third party direct sales within the U.K. Since Britain leads the European Community (E.C.) in common carriage provisions, the regulatory r6gime here provides a benchmark for the other Member States.

  20. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  1. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  2. Transmission Planning

    Broader source: Energy.gov [DOE]

    The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security.

  3. EERE Success Story-Columbia Power Technologies, Inc. Deploys...

    Broader source: Energy.gov (indexed) [DOE]

    In preparation for a full-scale bayocean demonstration and with EERE support, Columbia Power Technologies, Inc. (CPT) deployed an intermediate-scale wave energy converter to ...

  4. Columbia Gas of Virginia- Business Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Columbia Gas of Virginia offers rebates to commercial customers for the purchase and installation of energy efficient equipment. Water heaters, furnaces, boilers, controls, and infrared heaters are...

  5. Columbia Gas of Kentucky- Home Savings Rebate Program

    Broader source: Energy.gov [DOE]

    Columbia Gas of Kentucky offers rebates to residential customers for the purchase and installation of energy efficient appliances and equipment. These programs include:

  6. Columbia Water & Light- HVAC and Lighting Efficiency Rebates

    Office of Energy Efficiency and Renewable Energy (EERE)

    Columbia Water & Light (CWL) offers rebates to its commercial and industrial customers for the purchase of high efficiency HVAC installations and efficient lighting. Incentives for certain...

  7. Columbia River PUD- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers rebates for Energy Star manufactured homes, Energy Star appliances, duct sealing, ductless heat pumps, air-source heat pumps, Marathon water heaters, appliance recycling,...

  8. District of Columbia Recovery Act State Memo | Department of...

    Office of Environmental Management (EM)

    District of Columbia Recovery Act State Memo The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. ...

  9. District of Columbia Total Electric Power Industry Net Generation...

    U.S. Energy Information Administration (EIA) Indexed Site

    District of Columbia" "Energy Source",2006,2007,2008,2009,2010 "Fossil",81,75,72,35,200 " Coal","-","-","-","-","-" " Petroleum",81,75,72,35,200 " Natural Gas","-","-","-","-","-" ...

  10. District of Columbia Natural Gas Percent Sold to The Commercial...

    U.S. Energy Information Administration (EIA) Indexed Site

    by Local Distribution Companies (Percent) District of Columbia Natural Gas Percent Sold to The Commercial Sectors by Local Distribution Companies (Percent) Decade Year-0 ...

  11. District of Columbia Price of Natural Gas Delivered to Commercial...

    U.S. Energy Information Administration (EIA) Indexed Site

    Local Distributor Companies (Dollars per Thousand Cubic Feet) District of Columbia Price of Natural Gas Delivered to Commercial Sectors by Local Distributor Companies (Dollars per ...

  12. Certification of Non-Residence in the District of Columbia |...

    Office of Environmental Management (EM)

    Non-Residence in the District of Columbia More Documents & Publications Employee In-Processing Forms W4, Federal Withholding Tax Form CX-000155: Categorical Exclusion Determination...

  13. 2006 Final Transmission Proposal: Revenue Requirement Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the

  14. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect (OSTI)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  15. EA-2006: Columbia Estuary Ecosystem Restoration Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, preparing a programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence through breaching dikes and levees; partial reconnection of tidal influence through culverts, bridges, and tidegates; enhancement of the quantity and quality of tidal channels; removal of invasive species; and restoration of riparian habitat conditions, such as planting native vegetation.

  16. Technology Solutions for New Homes Case Study: Columbia County Habitat for Humanity Passive Townhomes

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Columbia County (New York) Habitat for Humanity (Columbia County Habitat) affiliate has been experimenting with high-performance building since 2012, starting with ENERGY STAR® Certified Homes....

  17. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

  18. Transmission | Department of Energy

    Energy Savers [EERE]

    resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on...

  19. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  20. Columbia River monitoring: Distribution of tritium in Columbia River water at the Richland Pumphouse

    SciTech Connect (OSTI)

    Dirkes, R.L.

    1993-02-01

    The Surface Environmental Surveillance Project (SESP) is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This report presents the results of a special study conducted as part of the SESP to supplement the routine Columbia River monitoring program and provide information relative to the dispersion and distribution of Hanford origin contaminants entering the river through the seepage of ground water along the Hanford Site. Sampling was conducted along cross sections to determine the distribution of tritium within the Columbia River at Richland, Washington. The investigation was also designed to evaluate the relationship between the average tritium concentrations in the river water at this location and in water collected from the routine SESP river monitoring system located at the city of Richland drinking water intake (Richland Pumphouse). This study was conducted during the summers of 1987 and 1988. Water samples were collected along cross sections located at or near the Richland Pumphouse monitoring station.

  1. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & ...

  2. Snake and Columbia Rivers Sediment Sampling Project

    SciTech Connect (OSTI)

    Pinza, M.R.; Word, J.Q; Barrows, E.S.; Mayhew, H.L.; Clark, D.R. )

    1992-12-01

    The disposal of dredged material in water is defined as a discharge under Section 404 of the Clean Water Act and must be evaluated in accordance with US Environmental Protection Agency regulation 40 CFR 230. Because contaminant loads in the dredged sediment or resuspended sediment may affect water quality or contaminant loading, the US Army Corps of Engineers (USACE), Walla Walla District, has requested Battelle/Marine Sciences Laboratory to collect and chemically analyze sediment samples from areas that may be dredged near the Port Authority piers on the Snake and Columbia rivers. Sediment samples were also collected at River Mile (RM) stations along the Snake River that may undergo resuspension of sediment as a result of the drawdown. Chemical analysis included grain size, total organic carbon, total volatile solids, ammonia, phosphorus, sulfides, oil and grease, total petroleum hydrocarbons, metals, polynuclear aromatic hydrocarbons, pesticides, polychlorinated biphenyls, and 21 congeners of polychlorinated dibenzodioxins and dibenzofurans.

  3. Slow Neutron Velocity Spectrometer Transmission Studies Of Pu

    DOE R&D Accomplishments [OSTI]

    Havens, W. W. Jr.; Melkonian, E.; Rainwater, L. J.; Levin, M.

    1951-05-28

    The slow neutron transmission of several samples of Pu has been investigated with the Columbia Neutron Velocity Spectrometer. Data are presented in two groups, those covering the energy region from 0 to 6 ev, and those covering the region above 6 ev. Below 6 ev the resolution was relatively good, and a detailed study of the cross section variation was made. Work above 6 ev consisted of merely locating levels and obtaining a rough idea of their strengths.

  4. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Order No. 1000 Transmission Ratemaking Enabling New Resources - Demand Response - Variable Generation - Storage 2 Stages of Transmission Planning - Local, ...

  5. Emergency Petition and Complaint of District of Columbia Public Service

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission | Department of Energy Petition and Complaint of District of Columbia Public Service Commission Emergency Petition and Complaint of District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Sections 202(c), 207 and 309 of the Federal Power Act ("FPA"), 16 U.S.C. §§ 824a(c), 824f and 825h, the District of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and Complaint to avert the impending shutdown of

  6. Comments of the District of Columbia Public Service Commission | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy the District of Columbia Public Service Commission Comments of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-06-1, issued by the Department of Energy ("DOE") in the above-captioned docket on February 17, 2006, the District of Columbia Public Service Commission ("DCPSC") hereby submits these Comments to provide the DOE and all interested parties with the information regarding the DCPSC's recent efforts to

  7. EERE Success Story—Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy

    Office of Energy Efficiency and Renewable Energy (EERE)

    Columbia Power Technologies, Inc. is working to advance their wave energy buoy to commercial readiness.

  8. Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy

    Broader source: Energy.gov [DOE]

    Columbia Power Technologies, Inc. is working to advance their wave energy buoy to commercial readiness.

  9. Hydromechanical transmission

    DOE Patents [OSTI]

    Orshansky, Jr. deceased, Elias; Weseloh, William E.

    1978-01-01

    A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

  10. American PowerNet (District of Columbia) | Open Energy Information

    Open Energy Info (EERE)

    American PowerNet Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 49730 This article is a stub. You...

  11. Columbia County, Arkansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    is a stub. You can help OpenEI by expanding it. Columbia County is a county in Arkansas. Its FIPS County Code is 027. It is classified as ASHRAE 169-2006 Climate Zone Number 3...

  12. EM's Richland Operations Office Completes Chromium Cleanup along Columbia River

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office and cleanup contractor Washington Closure Hanford have completed cleanup of chromium-contaminated soil along the Columbia River at the Hanford Site.

  13. Washington, District of Columbia: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Washington is a city in the District of Columbia.1 Contents 1 US Recovery Act Smart Grid Projects in...

  14. EIS-0170: Columbia River System Operation Review, BPA Area

    Broader source: Energy.gov [DOE]

    The Columbia River System Operation Review Final Environmental Impact Statement (EIS) evaluates the potential impacts of four alternatives that represent the likely range of allocations between the Federal and non-Federal projects.

  15. Endeavour Launch 4: From Columbia to Atlantis | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    From Columbia to Atlantis Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on...

  16. Columbia Water & Light- New Home ENERGY STAR Rebate

    Broader source: Energy.gov [DOE]

    Columbia Water and Light offers a $1,000 rebate to customers for the construction of new homes that achieve certification as Energy Star homes. The Energy Star designation is given to homes that...

  17. Consolidated Edison Sol Inc (District of Columbia) | Open Energy...

    Open Energy Info (EERE)

    Consolidated Edison Sol Inc Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 4191 This article is a...

  18. Columbia Power Coop Assn Inc | Open Energy Information

    Open Energy Info (EERE)

    search Name: Columbia Power Coop Assn Inc Place: Oregon Phone Number: HEPPNER OFFICE: 541-676-9146; CONDON OFFICE: 541-384-2023 Website: www.cbec.cc Outage Hotline:...

  19. Columbia Water & Light- Home Performance with ENERGY STAR Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water and Light, a municipal utility, offers rebates to its residential customers who make certain energy efficient improvements to the home. Under the Home Performance with Energy Star...

  20. Suez Energy Resources North America (District of Columbia) |...

    Open Energy Info (EERE)

    Suez Energy Resources North America Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 19107 This...

  1. Northern Mid-Columbia Foint Project Final Environmental Assessment

    Broader source: Energy.gov (indexed) [DOE]

    ... was conducted, including a search of site records housed at ... was able to obtain landowner permission to enter property. ... Columbia Salish groups were fluid in terms of land use. ...

  2. Direct Energy Services (District of Columbia) | Open Energy Informatio...

    Open Energy Info (EERE)

    Direct Energy Services Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 54820 This article is a stub....

  3. Glacial Energy Holdings (District of Columbia) | Open Energy...

    Open Energy Info (EERE)

    Glacial Energy Holdings Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 54871 This article is a stub....

  4. PEPCO Energy Services (District of Columbia) | Open Energy Information

    Open Energy Info (EERE)

    PEPCO Energy Services Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 14405 This article is a stub....

  5. UGI Energy Services, Inc. (District of Columbia) | Open Energy...

    Open Energy Info (EERE)

    UGI Energy Services, Inc. Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 56408 This article is a...

  6. Columbia basin project, Washington: Adams, Douglas, Franklin, Grant, Lincoln, and Walla Walla Counties

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Columbia Basin Project is a multipurpose development utilizing a portion of the resources of the Columbia River in the central part of the State of Washington. The key structure, Grand Coulee Dam, is on the main stem of the Columbia River about 90 miles west of Spokane, Wash. The extensive irrigation works extend southward on the Columbia Plateau 125 miles to the vicinity of Pasco, Wash., where the Snake and Columbia Rivers join.

  7. DOE - Office of Legacy Management -- Columbia University - NY 03

    Office of Legacy Management (LM)

    Columbia University - NY 03 FUSRAP Considered Sites Site: Columbia University (NY.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.03-1 Evaluation Year: 1985 NY.03-2 NY.03-3 Site Operations: Early research and development -- nuclear chain reaction (fission) and gaseous diffusion during the 1940s. NY.03-4 Site Disposition: Eliminated - Radiation levels below criteria - Indication of university sponsored

  8. NEPA analysis of US-Canadian power transactions under the Columbia River Treaty

    SciTech Connect (OSTI)

    Pierce, K.S.; Weintraub, N.H.; Linehan, A.O.

    1995-12-01

    The Columbia River Treaty of 1961 led to the development of three hydroelectric projects on the Columbia River in Canada and one in the United States. Canada sold its share of the downstream power generation benefits of these facilities to US utilities for 30 years. The administrator of the Bonneville Power Administration (BPA) of the US Department of Energy is the {open_quotes}United States Entity{close_quotes} under the Columbia River Treaty with Canada. BPA prepared the {open_quotes}Delivery of the Canadian Entitlement{close_quotes} Environmental Impact Statement (EIS) to evaluate alternative means for the US to return to Canada the Canadian share of the downstream benefits when these 30-year agreements expire. Alternatives on both sides of the US-Canada border included new high-voltage transmission lines; new generating and conservation resources; and power sales, exchanges, and other transactions. BPA developed an EIS methodology and graphical representation technique for comparing the diverse options associated with the Delivery of the Canadian Entitlement that were instrumental in helping managers understand the impacts of alternatives in a timely manner. A graphical, modular approach helped convey complex relationships in ways that were easy to read and understand. In addition, analysis of potential environmental impacts in Canada was developed in order to provide relevant information to US decision-makers, without compromising the Canadian environmental review process. As a result, environmental analysis was fully integrated into the decision process. The EIS approach used in this project has become a prototype for other Department of Energy NEPA documents, both site-specific and programmatic.

  9. RAPID/BulkTransmission/Transmission Siting & Interconnection...

    Open Energy Info (EERE)

    federal review). Bulk Transmission Transmission Siting & Interconnection in New Mexico New Mexico Statutes (N.M.S.) 62-9-1, 62-9-3(B), and 62-9-3.2 No Location Permit may be...

  10. NREL: Transmission Grid Integration - Transmission Planning and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Printable Version Transmission Grid Integration Home Issues Projects Western Wind & Solar ... Electricity Market Operations Energy Imbalance Markets FESTIV Model Active ...

  11. Transmission Capacity Forum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Address: Name: Organization Entity Type: Select the best fit for your role... Energy Trader Transmission Provider Employee Transmission Purchaser Energy Scheduler...

  12. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  13. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Transmission Grid Integration Transmission Grid...

  14. Data Compendium for the Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    Eslinger, P.W.; Huesties, L.R.; Maughan, A.D.; Miley, T.B.; Walters, W.H.

    1994-04-01

    The Columbia River Comprehensive Impact Assessment (CRCIA). The CRCIA is conducted by the Pacific Northwest Laboratory (PNL). The purpose of the CRCIA is to evaluate the current human and ecological risk from the Columbia River attributable to past and present activities on the Hanford Site. Human risk will be addressed for radioactive and hazardous materials over a range of river use options. Ecological risk will be evaluated relative to the health of the current river ecosystem. The initial effort for the CRCIA is the development of a compendium of existing data on Columbia River contamination. This document provides the data compendium. It also includes a discussion of data sources, descriptions of the physical format of the data, and descriptions of the search process used to identify data.

  15. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.

  16. Pepco and PJM Interconnection Comments on District of Columbia Public

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing | Department of Energy Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the

  17. EIS-0425: Mid-Columbia Coho Restoration, Washington

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of DOE’s Bonneville Power Administration’s proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

  18. 1993-1994 Final technical report for establishing the SECME Model in the District of Columbia

    SciTech Connect (OSTI)

    Vickers, R.G.

    1995-12-31

    This is the final report for a program to establish the SECME Model in the District of Columbia. This program has seen the development of a partnership between the District of Columbia Public Schools, the University of the District of Columbia, the Department of Energy, and SECME. This partnership has demonstrated positive achievement in mathematics and science education and learning in students within the District of Columbia.

  19. Columbia River : Terminal Fisheries Research Report : Annual Report 1994.

    SciTech Connect (OSTI)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1996-12-01

    In 1993 the Northwest Power Planning Council recommended in its Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin.

  20. Environmental Justice Activities: Community Leaders' Institute, West Columbia, South Carolina

    Broader source: Energy.gov [DOE]

    The Midlands Community Leaders’ Institute (CLI), sponsored by the Medical University of South Carolina, U.S. Department of Energy, U.S. Department of Defense, South Carolina State University, and Brookland Baptist Church was held in West Columbia, South Carolina, on July 13 and 14, 2012.

  1. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  2. Epidemiology and Control of Infectious Diseases of Salmonids in the Columbia River Basin, 1987 Annual Report.

    SciTech Connect (OSTI)

    Fryer, John L.

    1989-01-01

    The Department of Microbiology at Oregon State University with funding from the Bonneville Power Administration has been conducting a study concerning the epidemiology and control of three fish pathogens which cause major disease problems in salmonids of the Columbia River basin. The pathogens studied include Cera to myxa Shasta, the myxosporean parasite which causes ceratomyxosis; Renibacterium salmoninarum, the bacterium which is the etiological agent of bacterial kidney disease; and the rhabdovirus which causes infectious hematopoietic necrosis (IHN). During this project, the host and geographic range of C. Shasta have been more precisely determined and the known geographic range has been significantly expanded. The effects of the parasite on fish migrating through the Columbia River and on their introduction into salt water have been examined. Similar studies have been conducted with R. salmoninarum and it has been shown that bacterial kidney disease occurs at all life stages of salmonids and is responsible for mortality in both fresh and salt water. It has also been demonstrated that different isolates of R. salmoninarum have different antigenic composition. Results of demonstration projects designed to control IHN by using UV treated water for early rearing of salmonid fry were equivocal. The scope of the project was considerably narrowed and focused during the past two years The project has concentrated on a study concerning the biology of C. Shasta and the identification of potential chemotherapeutants for control of bacterial kidney disease. The emphasis of work on C. Shasta has been its pathogenesis. This aspect of the parasite has been investigated using histopathologic and immunologic methodology. Mode of transmission, the nature of the infectious stage, and potential intermediate hosts of the parasite have also been areas of active research. Classes of chemotherapeutants with the highest potential for efficacy against R. salmoninarum have been

  3. Montana/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Montana Electric Power Cooperative, Western Area Power Administration, Bonneville Power Administration, Western Area Power Administration, Columbia Grid, Northern Tier...

  4. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Bernier, David R.

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  5. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  6. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  7. PROTECTING GROUNDWATER & THE COLUMBIA RIVER AT THE HANFORD SITE

    SciTech Connect (OSTI)

    GERBER, M.S.

    2006-06-29

    Along the remote shores of the Columbia River in southeast Washington state, a race is on. Fluor Hanford, a prime cleanup contractor to the U.S. Department of Energy (DOE) at the Hanford Site, is managing a massive, multi-faceted project to remove contaminants from the groundwater before they can reach the Columbia. Despite the daunting nature and size of the problem--about 80 square miles of aquifer under the site contains long-lived radionuclides and hazardous chemicals--significant progress is being made. Many groups are watching, speaking out, and helping. A large. passionate, diverse, and geographically dispersed community is united in its desire to protect the Columbia River--the eighth largest in the world--and have a voice in Hanford's future. Fluor Hanford and the DOE, along with the US. Environmental Protection Agency (EPA) and the Washington Department of Ecology (Ecology) interact with all the stakeholders to make the best decisions. Together, they have made some remarkable strides in the battle against groundwater contamination under the site.

  8. McNary-John Day Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-03-08

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

  9. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  10. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  11. NREL: Transmission Grid Integration - Publications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications Want updates about future transmission grid integration webinars and ... and Transmission Study Flexible Energy Scheduling Tool for Integration of ...

  12. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  13. Electrical Engineer- Transmission Lines

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, North Dakota Maintenance, Transmission...

  14. Current Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  15. Previous Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  16. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  17. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  18. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 ...

  19. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact-Information-Transmission Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  20. Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia Contributes to International Electrotechnical Commission IEC 61400-26 Availability ...

  1. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  2. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  3. Microsoft PowerPoint - 2011_1012_Hansen_ColumbiaRiverComponent_Eco.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Component Risk Assessment Volume I: Screening Level Ecological Risk Assessment (DOE/RL-2010-117, Draft A) Ri C id (DOE/RL 2010 117, Draft A) Overview and key findings River Corridor Closure Project River Corridor Closure Project y g O t b 2011 October, 2011 Protecting the Columbia River U.S. Department of Energy Richland Operations Office RIVER CORRIDOR CLOSURE PROJECT Columbia River Component Columbia River Component Ecological Risk Assessment * Scope - Screening level ecological risk

  4. Microsoft PowerPoint - Columbia_River_Corridor_Rev_2_v2.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Columbia River Corridor The Columbia River Corridor projects selected for Recovery A t f di i l d d li hi f iliti di ti Act funding include demolishing facilities, remediating waste sites, and containing and treating contamination in groundwater. The projects support completing cleanup along the Columbia River and shrinking the active area of cleanup to the center of the Hanford Site (the Central Plateau) by 2015 1 of the Hanford Site (the Central Plateau) by 2015. May 2009 Shrinking the

  5. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  6. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  7. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix T (Second Continued Volume): Comments & Responses.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This is Appendix T (second continued volume) giving public comments and responses to the final environmental impact statement for the Columbia River System.

  8. MiniBooNE Antineutrino Data Van Nguyen Columbia University

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Moriond EW 2008 Coherent NC π 0 Production in the MiniBooNE Antineutrino Data Van Nguyen Columbia University for the MiniBooNE collaboration Moriond EW 2008 2 Moriond EW 2008 At low energy, NC π 0 's can be created through resonant and coherent production:  Resonant NC π 0 production:  Coherent NC π 0 production: (Signature: π 0 which is highly forward-going) NC π 0 Production 3 Moriond EW 2008 Why study coherent NC π 0 production? ➔ NC π 0 events are the dominant bgd to osc

  9. District of Columbia Natural Gas Pipeline and Distribution Use (Million

    U.S. Energy Information Administration (EIA) Indexed Site

    Cubic Feet) (Million Cubic Feet) District of Columbia Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 246 256 244 2000's 243 236 242 470 466 487 464 238 203 177 2010's 213 1,703 1,068 1,434 1,305 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 8/31/2016 Next Release Date: 9/30/2016 Referring Pages:

  10. Alexis A. Aguilar-Arévalo Columbia University

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the NuMI beam line in the MiniBooNE detector Alexis A. Aguilar-Arévalo Columbia University for the MiniBooNE/MINOS Collaborations Alexis A. Aguilar-Arévalo PANIC 2005 Santa Fe, New Mexico October 24, 2005 October 24, 2005 PANIC The NuMI beam line - NuMI beam: provides neutrinos for the MINOS experiment studying neutrino oscillations in the atmospheric oscillations regime (Super-K). - Other experiments will be users of this beam line (NOνA, MINERvA). MiniBooNE is "on the way" of NuMI

  11. District of Columbia Natural Gas Vehicle Fuel Consumption (Million Cubic

    Gasoline and Diesel Fuel Update (EIA)

    (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 0 0 0 2000's 0 0 0 -- -- -- -- -- -- -- 2010's -- 1,003 W Cubic Feet)

    Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's -- -- -- -- -- -- -- -- -- 2010's

    Elements)

    Commercial Consumers (Number of Elements) District of Columbia Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5

  12. Electric Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System ... Can we agree on several key design attributes for the future grid? Taking Action in the ...

  13. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  14. Electricity Transmission, A Primer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the power from low-cost, mine- mouth coal power plants and wind generators in Wyoming. ... As a result, the transmission system helps to insulate electricity consumers from the ...

  15. Transmission Grid Integration

    Office of Energy Efficiency and Renewable Energy (EERE)

    The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

  16. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  17. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    "05 * Nine Agency MOU - Oct. 2009 * Transmission Cabinet * Designated 7 Pilot Projects DOD CEQ FERC USDA DOE ACHP EPA DOI DOC RRTT Pilot Projects RRTT Rapid Response Team for ...

  18. Transmission Developers Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ' % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of

  19. Transmission Infrastructure Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRANSMISSION INFRASTRUCTURE PROGRAM DOE Tribal Energy Summit 2015 SECRETARYOF ENERGY'S FINANCING ROUNDTABLE Tracey A. LeBeau Senior Vice President & Transmission Infrastructure Program Manager 1 Program Description Western's Loan Authority * $3.25 billion permanent authority (revolving) * Goal: Attract investment in infrastructure & address market needs * Commercial underwriting standards TIP Portfolio Management Fundamentals * Reflective of Market Need(s) * Ensure Funds Revolve 2 Recent

  20. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  1. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  2. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  3. EIS-0206: Joint NEPA/SEPA Proposed Columbia Wind Farm No. 1, Goldendale, Washington

    Broader source: Energy.gov [DOE]

    Conservation and Renewable Energy Systems (CARES) proposes to construct and operate Columbia Wind Farm No. 1 in the Columbia Hills area, southeast of Goldendale, in Klickitat County, Washington. The U.S. Department of Energy’s Bonneville Power Administration prepared this statement in order to fulfill its National Environmental Policy Act obligations ahead of signing an agreement with CARES.

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  5. Utah/Transmission | Open Energy Information

    Open Energy Info (EERE)

    all of these service territories. Intermountain Power Agency, Western Area Power Administration, Bonneville Power Association, Western Area Power Administration, Columbia Grid,...

  6. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented

  7. Stock Assessment of Columbia River Anadromous Salmonids : Final Report, Volume II, Steelhead Stock Summaries, Stock Transfer Guidelines, Information Needs.

    SciTech Connect (OSTI)

    Howell, Philip J.

    1985-07-01

    This report presents brief descriptions of wild and hatchery-raised steelhead trout stocks in the Columbia River Basin. (ACR)

  8. ITC Transmission | Open Energy Information

    Open Energy Info (EERE)

    ITC Transmission Jump to: navigation, search Name: ITC Transmission Place: Michigan Phone Number: Western Michigan Office: (269) 792-7223 -- Northern Michigan Office: (989)...

  9. REGULATORY SIDE-BY-SIDE GOVERNING PERMITTING OF CROSS-BORDER...

    Broader source: Energy.gov (indexed) [DOE]

    & Wildlife CANADA Yukon Yukon Utilities Board Yukon Environmental and Socio-economic Assessment Board * Environment Yukon British Columbia British Columbia Utilities Commission...

  10. Columbia River Hatchery Reform System-Wide Report.

    SciTech Connect (OSTI)

    Warren, Dan

    2009-04-16

    Puget Sound/Coastal Washington hatchery programs, followed by the development in 2005 of a suite of analytical tools to support application of the principles (all reports and tools are available at www.hatcheryreform.us). In 2005, Congress directed the National Oceanic and Atmospheric Administration-Fisheries (NOAA Fisheries) to replicate the Puget Sound and Coastal Washington Hatchery Reform Project in the Columbia River Basin. The HSRG was expanded to 14 members to include individuals with specific knowledge about the Columbia River salmon and steelhead populations. This second phase was initially envisioned as a one-year review, with emphasis on the Lower Columbia River hatchery programs. It became clear however, that the Columbia River Basin needed to be viewed as an inter-connected ecosystem in order for the review to be useful. The project scope was subsequently expanded to include the entire Basin, with funding for a second year provided by the Bonneville Power Administration (BPA) under the auspices of the Northwest Power and Conservation Council's (NPCC) Fish and Wildlife Program. The objective of the HSRG's Columbia River Basin review was to change the focus of the Columbia River hatchery system. In the past, these hatchery programs have been aimed at supplying adequate numbers of fish for harvest as mitigation primarily for hydropower development in the Basin. A new, ecosystem-based approach is founded on the idea that harvest goals are sustainable only if they are compatible with conservation goals. The challenge before the HSRG was to determine whether or not conservation and harvest goals could be met by fishery managers and, if so, how. The HSRG determined that in order to address these twin goals, both hatchery and harvest reforms are necessary. The HSRG approach represents an important change of direction in managing hatcheries in the region. It provides a clear demonstration that current hatchery programs can indeed be redirected to better meet both

  11. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  12. Assessing Pacific Lamprey Status in the Columbia River Basin.

    SciTech Connect (OSTI)

    Moser, Mary L.; Close, David A.

    2003-06-01

    In the Columbia River drainage, salmonid-based monitoring programs have historically been used to assess status of both adult and juvenile Pacific lamprey. We compared adult lamprey counts at hydropower dams to recent radiotelemetry results and found that the counts underestimated losses between some dams and overestimated passage times through reservoirs. Count data were not correlated with trap captures of adults conducted in the same area and at the same time, likely due to lamprey-specific behaviors that result in inaccurate counts. We recommend maintenance of traditional count protocols, but emphasize the need for continued research to develop an accurate correction factor to apply to these data. Existing salmonid-based sampling for juvenile lamprey is inadequate and we highlight the need for standardized larval lamprey monitoring that provides both abundance and size distributions. Our electrofishing survey for juvenile lamprey indicated that this technique provides critical information on lamprey recruitment and is feasible over large spatial scales.

  13. Supplementation in the Columbia Basin : Summary Report Series : Final Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-12-01

    This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first of a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment

  14. Federally-Recognized Tribes of the Columbia-Snake Basin.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    1997-11-01

    This is an omnibus publication about the federally-recognized Indian tribes of the Columbia-Snake river basin, as presented by themselves. It showcases several figurative and literal snapshots of each tribe, bits and pieces of each tribe`s story. Each individual tribe or tribal confederation either submitted its own section to this publication, or developed its own section with the assistance of the writer-editor. A federally-recognized tribe is an individual Indian group, or confederation of Indian groups, officially acknowledged by the US government for purposes of legislation, consultation and benefits. This publication is designed to be used both as a resource and as an introduction to the tribes. Taken together, the sections present a rich picture of regional indian culture and history, as told by the tribes.

  15. District of Columbia Natural Gas Input Supplemental Fuels (Million Cubic

    U.S. Energy Information Administration (EIA) Indexed Site

    Feet) Input Supplemental Fuels (Million Cubic Feet) District of Columbia Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 2 1 46 0 0 0 0 0 0 0 1990's 0 0 0 0 0 0 0 0 0 0 2000's 0 0 0 0 0 0 0 0 0 0 2010's 0 0 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 08/31/2016

  16. District of Columbia Natural Gas Pipeline and Distribution Use Price

    U.S. Energy Information Administration (EIA) Indexed Site

    (Dollars per Thousand Cubic Feet) Price (Dollars per Thousand Cubic Feet) District of Columbia Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 3.94 4.73 4.37 4.16 3.61 3.02 2.94 3.03 1990's 2.99 2.78 2.95 2.58 2.13 1.97 3.02 2.97 2.52 2.39 2000's 4.63 5.36 NA -- -- -- - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual

  17. District of Columbia Natural Gas Total Consumption (Million Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    Total Consumption (Million Cubic Feet) District of Columbia Natural Gas Total Consumption (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 34,105 30,409 32,281 2000's 33,468 29,802 32,898 32,814 32,227 32,085 29,049 32,966 31,880 33,177 2010's 33,251 32,862 28,561 32,743 34,057 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 8/31/2016 Next Release

  18. District of Columbia Number of Natural Gas Consumers

    Gasoline and Diesel Fuel Update (EIA)

    Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2010 75 68 75 73 75 73 75 75 73 75 73 75 2011 75 67 75 72 75 72 75 75 72 75 72 75 2012 74 69 74 71 74 71 74 74 71 74 71 74 2013 73 66 73 71 73 71 73 73 71 73 71 73 2014 86 78 86 83 86 83 86 86 83 86 83 86 2015 83 75 83 80 83 79 86 86 83 86 83 86 2016 95 86 95 92 76 7 Cubic Feet)

    Vehicle Fuel Price (Dollars per Thousand Cubic Feet) District of Columbia Natural Gas Vehicle Fuel Price (Dollars per Thousand Cubic Feet) Decade

  19. Columbia River: Terminal fisheries research project. 1994 Annual report

    SciTech Connect (OSTI)

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  20. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  1. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; DeGrassie, John S.

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  2. Columbia Basin Elec Cooperative, Inc | Open Energy Information

    Open Energy Info (EERE)

    EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data Utility Id 4005 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Transmission Yes...

  3. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  4. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  5. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M.

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  6. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  7. Energy Transition Initiative, Island Energy Snapshot - British Virgin Islands (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2015-03-01

    This profile provides a snapshot of the energy landscape of the British Virgin Islands (BVI), one of three sets of the Virgin Island territories in an archipelago making up the northern portion of the Lesser Antilles.

  8. Request for Extension of Order No. 202-05-3 of the District of Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Service Commission | Department of Energy Extension of Order No. 202-05-3 of the District of Columbia Public Service Commission Request for Extension of Order No. 202-05-3 of the District of Columbia Public Service Commission Docket No. EO-05-01. Order No. 202-05-3: Pursuant to Section 202(c) of the Federal Power Act ("FPA"),1 16 U.S.C. § 824a(c), the District of Columbia Public Service Commission ("DCPSC") hereby requests that the Secretary of Energy

  9. FERC must adopt an efficient transmission pricing system - now

    SciTech Connect (OSTI)

    Pierce, R.J. Jr.

    1997-10-01

    In spite of assumptions to the contrary, this nation will not enjoy competitive power markets until the Federal Energy Regulatory Commission (FERC) uses its bully pulpit to require establishment of--and prescribe minimum authorities for--properly sized ISOs that administer efficient transmission pricing. In 1989, the FERC recognized that getting transmission pricing right is the crucial first step in the process of creating a competitive electricity market. A lot has happened in the ensuing eight years. There is now a competitive wholesale market, and retail competition is beginning in many states. Yet, FERC has not made any progress in taking that crucial first step. Unless FERC abandons the present archaic system of transmission pricing promptly, competition will produce a long list of unintended adverse effects. The short-term effects will include markets too small to support effective competition and misleading price signals that induce buyers and sellers to make decisions that waste resources. The long-term effects will include large investments in capital assets at the wrong locations, and ill-informed antitrust and regulatory decisions. These effects will also create scores of entities with a powerful vested interest in retaining the status quo forever. As the British have discovered, once that happens, it is almost impossible to abandon an inefficient pricing system.

  10. Recent developments in blast furnace process control within British Steel

    SciTech Connect (OSTI)

    Warren, P.W.

    1995-12-01

    British Steel generally operates seven blast furnaces on four integrated works. All furnaces have been equipped with comprehensive instrumentation and data logging computers over the past eight years. The four Scunthorpe furnaces practice coal injection up to 170 kg/tHM (340 lb/THM), the remainder injecting oil at up to 100 kg/tHM (200 lb/THM). Distribution control is effected by Paul Wurth Bell-Less Tops on six of the seven furnaces, and Movable Throat Armour with bells on the remaining one. All have at least one sub burden probe. The blast furnace operator has a vast quantity of data and signals to consider and evaluate when attempting to achieve the objective of providing a consistent supply of hot metal. Techniques have been, and are being, developed to assist the operator to interpret large numbers of signals. A simple operator guidance system has been developed to provide advice, based on current operating procedures and interpreted data. Further development will involve the use of a sophisticated Expert System software shell.

  11. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Bradford, Kline; Fox, Joe

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  12. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  13. EIS-0163-S: Supplemental EIS/1993 Interim Columbia and Snake Rivers Flow Improvement Measures for Salmon

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers – Walla Walla District has prepared this statement to assess alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. The U.S. Department of Energy’s Bonneville Power Administration served as a cooperating agency in developing this supplement due to its key role in direct operation of the integrated and coordinated Columbia-Snake River System, and adopted this statement in March of 1993. This statement supplements the 1992 Columbia River Salmon Flow Measures Options Analysis Environmental Impact Statement, which evaluated ways to alter water management operations in 1992 on the lower Columbia and Snake rivers to enhance the survival of wild Snake River salmon.

  14. Cost-Effectiveness of ASHRAE Standard 90.1-2010 for the District of Columbia

    SciTech Connect (OSTI)

    Hart, Philip R.; Rosenberg, Michael I.; Xie, YuLong; Zhang, Jian; Richman, Eric E.; Elliott, Douglas B.; Loper, Susan A.; Myer, Michael

    2013-11-29

    Moving to the ANSI/ASHRAE/IES Standard 90.1-2010 version from the Base Code (90.1-2007) is cost-effective for all building types and climate zones in the District of Columbia.

  15. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  16. Appendix TFIELD: Transmissivity Fields

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix TFIELD-2014 Transmissivity Fields United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix TFIELD-2014 Table of Contents TFIELD-1.0 Overview of the T-field Development, Calibration, and Mining Modification Process TFIELD-2.0 Geologic Data TFIELD-2.1 Culebra Hydrogeologic Setting TFIELD-2.2 Refinement of Geologic Boundaries TFIELD-2.2.1 Rustler Halite Margins TFIELD-2.2.2 Salado

  17. Seasonal Juvenile Salmonid Presence and Migratory Behavior in the Lower Columbia River

    SciTech Connect (OSTI)

    Carter, Jessica A.; McMichael, Geoffrey A.; Welch, Ian D.; Harnish, Ryan A.; Bellgraph, Brian J.

    2009-04-30

    To facilitate preparing Biological Assessments of proposed channel maintenance projects, the Portland District of the U.S. Army Corps of Engineers contracted the Pacific Northwest National Laboratory to consolidate and synthesize available information about the use of the lower Columbia River and estuary by juvenile anadromous salmonids. The information to be synthesized included existing published documents as well as data from five years (2004-2008) of acoustic telemetry studies conducted in the Columbia River estuary using the Juvenile Salmon Acoustic Telemetry System. For this synthesis, the Columbia River estuary includes the section of the Columbia River from Bonneville Dam at river kilometer (Rkm) 235 downstream to the mouth where it enters the Pacific Ocean. In this report, we summarize the seasonal salmonid presence and migration patterns in the Columbia River estuary based on information from published studies as well as relevant data from acoustic telemetry studies conducted by NOAA Fisheries and the Pacific Northwest National Laboratory (PNNL) between 2004 and 2008. Recent acoustic telemetry studies, conducted using the Juvenile Salmon Acoustic Telemetry System (JSATS; developed by the Portland District of the U.S. Army Corps of Engineers), provided information on the migratory behavior of juvenile steelhead (O. mykiss) and Chinook salmon in the Columbia River from Bonneville Dam to the Pacific Ocean. In this report, Section 2 provides a summary of information from published literature on the seasonal presence and migratory behavior of juvenile salmonids in the Columbia River estuary and plume. Section 3 presents a detailed synthesis of juvenile Chinook salmon and steelhead migratory behavior based on use of the JSATS between 2004 and 2008. Section 4 provides a discussion of the information summarized in the report as well as information drawn from literature reviews on potential effects of channel maintenance activities to juvenile salmonids rearing in

  18. Columbia River Pathway Dosimetry Report, 1944-1992. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Farris, W.T.; Napier, B.A.; Simpson, J.C.; Snyder, S.F.; Shipler, D.B.

    1994-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of radionuclide emissions since 1944 from the Hanford Site. One objective of the HEDR Project is to estimate doses to individuals who were exposed to the radionuclides released to the Columbia River (the river pathway). This report documents the last in a series of dose calculations conducted on the Columbia River pathway. The report summarizes the technical approach used to estimate radiation doses to three classes of representative individuals who may have used the Columbia River as a source of drinking water, food, or for recreational or occupational purposes. In addition, the report briefly explains the approaches used to estimate the radioactivity released to the river, the development of the parameters used to model the uptake and movement of radioactive materials in aquatic systems such as the Columbia River, and the method of calculating the Columbia River`s transport of radioactive materials. Potential Columbia River doses have been determined for representative individuals since the initiation of site activities in 1944. For this report, dose calculations were performed using conceptual models and computer codes developed for the purpose of estimating doses. All doses were estimated for representative individuals who share similar characteristics with segments of the general population.

  19. Geothermal regime and thermal history of the Llanos Basin, Columbia

    SciTech Connect (OSTI)

    Bachu, S.; Underschultz, J.R.; Ramon, J.C.; Villegas, M.E.

    1995-01-01

    The Llanos basin is a siliciclastic foreland sub-Andean sedimentary basin located in Columbia between the Cordillera Oriental and the Guyana Precambrian shield. Data on bottom-hole temperature, lithology, porosity, and vitrinite reflectance from all 318 wells drilled in the central and southern parts of the basin were used to analyze its geothermal regime and thermal history. Average geothermal gradients in the Llanos basin decrease generally with depth and westward toward the fold and thrust belt. The geothermal regime is controlled by a moderate, generally westward-decreasing basement heat flow, by depositional and compaction factors, and, in places, by advection by formation waters. Compaction leads to increased thermal conductivity with depth, whereas westward downdip flow in deep sandstone formations may exert a cooling effect in the central-western part of the basin. Vitrinite reflectance variation with depth shows a major discontinuity at the pre-Cretaceous unconformity. Areally, vitrinite reflectance increases southwestward in Paleozoic strata and northwestward in post-Paleozoic strata. These patterns indicate that the thermal history of the basin probably includes three thermal events that led to peaks in oil generation: a Paleozoic event in the southwest, a failed Cretaceous rifting event in the west, and an early Tertiary back-arc event in the west. Rapid cooling since the last thermal event is possibly caused by subhorizontal subduction of cold oceanic lithospheric plate.

  20. District of Columbia Natural Gas % of Total Residential Deliveries

    Gasoline and Diesel Fuel Update (EIA)

    (BTU per Cubic Foot) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2013 1,030 1,025 1,021 1,014 1,014 1,025 1,034 1,037 1,043 1,041 1,047 1,048 2014 1,041 1,035 1,031 1,038 1,035 1,038 1,038 1,038 1,039 1,041 1,044 1,043 2015 1,045 1,047 1,046 1,044 1,044 1,040 1,037 1,036 1,035 1,045 1,039 1,044 2016 1,051 1,049 1,043 1,040 1,035 1,03 (Percent)

    % of Total Residential Deliveries (Percent) District of Columbia Natural Gas % of Total Residential Deliveries (Percent) Decade Year-0

  1. Description of the Columbia Basin Wind Energy Study (CBWES)

    SciTech Connect (OSTI)

    Berg, Larry K.; Pekour, Mikhail S.; Nelson, Danny A.

    2012-10-01

    The purpose of this Technical Report is to provide background information about the Columbia Basin Wind Energy Study (CBWES). This study, which was supported by the U.S. Department of Energy’s Wind and Water Power Program, was conducted from 16 November 2010 through 21 March 2012 at a field site in northeastern Oregon. The primary goal of the study was to provide profiles of wind speed and wind direction over the depth of the boundary layer in an operating wind farm located in an area of complex terrain. Measurements from propeller and vane anemometers mounted on a 62 m tall tower, Doppler Sodar, and Radar Wind Profiler were combined into a single data product to provide the best estimate of the winds above the site during the first part of CBWES. An additional goal of the study was to provide measurements of Turbulence Kinetic Energy (TKE) near the surface. To address this specific goal, sonic anemometers were mounted at two heights on the 62 m tower on 23 April 2011. Prior to the deployment of the sonic anemometers on the tall tower, a single sonic anemometer was deployed on a short tower 3.1 m tall that was located just to the south of the radar wind profiler. Data from the radar wind profiler, as well as the wind profile data product are available from the Atmospheric Radiation Measurements (ARM) Data Archive (http://www.arm.gov/data/campaigns). Data from the sonic anemometers are available from the authors.

  2. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  3. Proceedings of the Columbia River Estuary Conference on Ecosystem Restoration.

    SciTech Connect (OSTI)

    U.S. Bonneville Power Administration

    2008-08-01

    The 2008 Columbia River Estuary Conference was held at the Liberty Theater in Astoria, Oregon, on April 19-20. The conference theme was ecosystem restoration. The purpose of the conference was to exchange data and information among researchers, policy-makers, and the public, i.e., interrelate science with management. Conference organizers invited presentations synthesizing material on Restoration Planning and Implementation (Session 1), Research to Reduce Restoration Uncertainties (Session 2), Wetlands and Flood Management (Session 3), Action Effectiveness Monitoring (Session 4), and Management Perspectives (Session 5). A series of three plenary talks opened the conference. Facilitated speaker and audience discussion periods were held at the end of each session. Contributed posters conveyed additional data and information. These proceedings include abstracts and notes documenting questions from the audience and clarifying answers from the presenter for each talk. The proceedings also document key points from the discussion periods at the end of each session. The conference program is outlined in the agenda section. Speaker biographies are presented in Appendix A. Poster titles and authors are listed in Appendix B. A list of conference attendees is contained in Appendix C.

  4. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  5. GTT 2012 Transmission Workshop- Documents

    Broader source: Energy.gov [DOE]

    Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012

  6. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS

  7. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system, the economics, and the policies. Electricity Transmission, A Primer (1.95 MB) More Documents & Publications Draft Chapter 4: Transmission Adequacy Electricity Grid Basics Webinar Presentation Slides and Text Version Chapter 4 Transmission Adequacy

  8. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  9. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Rausen, David J.

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  10. RAPID/Bulk Transmission | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History RAPIDBulk Transmission < RAPID(Redirected from RAPIDOverviewBulkTransmission) Redirect page Jump to: navigation, search REDIRECT RAPIDBulkTransmission...