National Library of Energy BETA

Sample records for british columbia electric

  1. PP-22 British Columbia Electric Company, Limited | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Limited PP-22 British Columbia Electric Company, Limited Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-22 British Columbia Electric Company, Limited More Documents & Publications PP-22 British Columbia Electric Company, Limited, Amendment 1957

  2. PP-22 British Columbia Electric Company, Limited, Amendment 1957 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Limited, Amendment 1957 PP-22 British Columbia Electric Company, Limited, Amendment 1957 Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-22 British Columbia Electric Company, Limited More Documents & Publications PP-22 British Columbia Electric Company, Limited

  3. PP-22-1 British Columbia Electric Company, Limited | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 British Columbia Electric Company, Limited PP-22-1 British Columbia Electric Company, Limited Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-22-1 British Columbia Electric Company, Limited More Documents & Publications PP-22 British Columbia Electric Company, Limited PP-22 British Columbia Electric Company, Limited, Amendment 1957 PP-22-4 British Columbia

  4. PP-22 British Columbia Hydro and Power Authority, Amendment 1967 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hydro and Power Authority, Amendment 1967 PP-22 British Columbia Hydro and Power Authority, Amendment 1967 Presidential permit authorizing British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmision facilities at the U.S-Canadian border. PDF icon PP-22 British Columbia Hydro and Power Authority More Documents & Publications PP-22 British Columbia Electric Company, Limited, Amendment 1957 PP-22 British Columbia Electric Company,

  5. Application for Presidential Permit OE Docket No. PP-369 British Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Corporation and British Columbia Hydro and Power Authority | Department of Energy 69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application from British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmission

  6. British Columbia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    it. British Columbia is a province in Canada. Energy Incentives for British Columbia Energy Monitoring Act (Canada) Western Interstate Nuclear Compact State Nuclear Policy...

  7. PP-22-4 British Columbia Transmission Corporation

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Transmission Corporation to construct, operate, and mantain electric transmission facilities at the U.S-Canadian border.

  8. PP-369 British Columbia Hydro and Power Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-369 British Columbia Hydro and Power Authority PP-369 British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia and Power Authority to...

  9. PP-369 British Columbia Hydro and Power Authority | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 British Columbia Hydro and Power Authority PP-369 British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia and Power Authority to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-369 BC Hydro.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-54 Ontario Hydro Electric

  10. British Columbia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Incentives for British Columbia Energy Monitoring Act (Canada) Western Interstate Nuclear Compact State Nuclear Policy (Multiple States) References http:...

  11. British Columbia UILO | Open Energy Information

    Open Energy Info (EERE)

    UILO Jump to: navigation, search Name: British Columbia UILO Place: Canada Sector: Services Product: General Financial & Legal Services ( Academic Research foundation )...

  12. EA-145-A British Columbia Power Exchange Corporation | Department of Energy

    Energy Savers [EERE]

    A British Columbia Power Exchange Corporation EA-145-A British Columbia Power Exchange Corporation Order authorizing British Columbia Power Exchange Corporation to export electric energy to Mexico. PDF icon EA-145-A British Columbia Power Exchange Corporation More Documents & Publications EA-184 Morgan Stanley Capital Group Inc. EA-171-A Powerex EA-167 PG&E Energy Trading-Power, L.P

  13. Three Pacific Coast States Join British Columbia to Combat Climate Change

    Broader source: Energy.gov [DOE]

    California, Oregon, Washington, and British Columbia signed a regional agreement to strategically align policies to reduce greenhouse gas emissions and promote clean energy.

  14. Columbia Utilities Electricity | Open Energy Information

    Open Energy Info (EERE)

    Electricity Jump to: navigation, search Name: Columbia Utilities Electricity Place: New York Phone Number: (877) 726-5862 Website: www.columbiautilities.com Twitter:...

  15. Adams-Columbia Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    Adams-Columbia Electric Coop Jump to: navigation, search Name: Adams-Columbia Electric Coop Place: Wisconsin Phone Number: 800-831-8629 Website: www.acecwi.com Twitter: @ACECWI...

  16. Application for Presidential Permit OE Docket No. PP-369 British...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission ...

  17. District of Columbia Natural Gas Deliveries to Electric Power Consumers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Million Cubic Feet) Deliveries to Electric Power Consumers (Million Cubic Feet) District of Columbia Natural Gas Deliveries to Electric Power Consumers (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 0 0 0 0 0 0 0 0 0 0 0 0 2002 0 0 0 0 0 0 0 0 0 0 0 0 2003 -- -- -- -- -- -- -- -- -- -- -- -- 2004 -- -- -- -- -- -- -- -- -- -- -- -- 2005 -- -- -- -- -- -- -- -- -- -- -- -- 2006 -- -- -- -- -- -- -- -- -- -- -- -- 2007 -- -- -- -- -- -- -- -- -- -- -- -- 2008

  18. Accounting for social impacts and costs in the forest industry, British Columbia

    SciTech Connect (OSTI)

    Gale, Robert . E-mail: rgale@web.net; Gale, Fred . E-mail: fred.gale@utas.edu.au

    2006-03-15

    Business reviews of the forest industry in British Colombia, Canada, typically portray an unequivocally positive picture of its financial and economic health. In doing so, they fail to consider the following six categories of social impacts and costs: (1) direct and indirect subsidies; (2) government support through investment; (3) community dependence; (4) the maintenance of public order; (5) aboriginal title; and (6) the overestimation of employment. Our findings show that conventional economic and financial accounting methods inflate the industry's net contribution to the economy. We make a number of recommendations to address this shortcoming to improve future accounting and reporting procedures.

  19. Demand forecasting and revenue requirements, with implications for consideration in British Columbia

    SciTech Connect (OSTI)

    Acton, J.P.

    1983-05-01

    This paper was filed as an exhibit on behalf of The Consumers' Association of Canada (B.C. Branch), The Federated Anti-Poverty Groups of B.C., The Sierra Club of Western Canada, and the B.C. Old Age Pensioners' Organization. It was subjected to cross-examination on October 29, 1982, during Phase I of the hearings. The Utilities Commission had designated Phase I for consideration of (1) demand, (2) assets in service, (3) revenue requirements excluding return, and (4) financing and capital requirements. This paper presents a general discussion of the elements of a rate structure and their relationship to the demand for electricity, a systematic review of some 50 empirical studies of the demand for electricity as a function of price and other factors by the three principal classes of customers, and a discussion of the notion of revenue requirements. The paper should be of interest to utility regulators, rate specialists, and forecasters for its review of demand models and to academics concerned with the study of energy demand.

  20. District of Columbia Natural Gas Price Sold to Electric Power Consumers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Dollars per Thousand Cubic Feet) Price Sold to Electric Power Consumers (Dollars per Thousand Cubic Feet) District of Columbia Natural Gas Price Sold to Electric Power Consumers (Dollars per Thousand Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2002 -- -- -- -- -- -- -- -- -- -- -- -- 2003 -- -- -- -- -- -- -- -- -- -- -- -- 2004 -- -- -- -- -- -- -- -- -- -- -- -- 2005 -- -- -- -- -- -- -- -- -- -- -- -- 2006 -- -- -- -- -- -- -- -- -- -- -- -- 2007 -- -- -- -- -- -- --

  1. Application to Amend Presidential Permit OE Docket No. PP-022-4 British

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 | Department of Energy Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application from British Columbia Transmission Corporation to

  2. PP-54 Ontario Hydro Electric Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-54 Ontario Hydro Electric Power Commission More Documents & Publications PP-369 British Columbia Hydro and Power Authority PP-64 Basin Electric Power Cooperative PP-61 Minnkota Power Cooperative (MPC)

  3. PP-20-1 Eastern Maine Electric Cooperative Inc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20-1 Eastern Maine Electric Cooperative Inc PP-20-1 Eastern Maine Electric Cooperative Inc Presidential permit authorizing Eastern Maine Electric Cooperative Inc to construct, operate and maintain electric transmision facilities at the U.S-Canadian border. PDF icon PP-20-1 Eastern Maine Electric Cooperative Inc More Documents & Publications PP-18 Glacier Electric Cooperative, Inc PP-22 British Columbia Hydro and Power Authority, Amendment 1967 PP-230-3

  4. Columbia Water & Light- Solar Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water & Light electric customers are eligible for a $400 rebate for the purchase of a new solar water heater. To apply for this rebate, a customer submits a pre-approval application to...

  5. Columbia Water & Light- Solar Energy Loans

    Broader source: Energy.gov [DOE]

    Columbia Water & Light (CWL) offers electric residential and commercial customers low-interest loans for photovoltaic (PV) systems and solar water heaters.

  6. City of Columbia- Renewable Portfolio Standard

    Broader source: Energy.gov [DOE]

    In November 2004, voters in Columbia, Missouri, approved* a proposal to adopt a local renewable portfolio standard (RPS). (The state renewable electricity standard adopted by ballot initiative in...

  7. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    District of Columbia Electricity Profile 2013 Table 1. 2013 Summary statistics (District of Columbia) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity...

  8. COLUMBIA UNIVERSITY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    W^ 8 1903 NEVIS 115 COLUMBIA UNIVERSITY Department of Physics I n t e n s i t y of Upward Muon F l u x Due t o Cosmic Ray N e u t r i n o s P r o d u c e d i n t h e A t m o s p h e r e D. LEE, H. ROBINSON, M. SCHWARTZ and R. COOL L E G A L N O T I C E This report wse prepared as an account of Government Bpondored work. Neither the United States, nor the Commlsalon, oar any person acting on behajf of the Commission- A. Makes any warranty or representation, expressed or Implied, with respect to

  9. Columbia River PUD- Residential Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to residential customers for making energy efficient improvements to electrically heated homes. Rebates are available for Energy Star manufactured...

  10. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  11. Columbia River Treaty History and 2014/2024 Review

    SciTech Connect (OSTI)

    2009-02-01

    The Columbia River, the fourth largest river on the continent as measured by average annual flow, generates more power than any other river in North America. While its headwaters originate in British Columbia, only about 15 percent of the 259,500 square miles of the Columbia River Basin is actually located in Canada. Yet the Canadian waters account for about 38 percent of the average annual volume, and up to 50 percent of the peak flood waters, that flow by The Dalles Dam on the Columbia River between Oregon and Washington. In the 1940s, officials from the United States and Canada began a long process to seek a joint solution to the flooding caused by the unregulated Columbia River and to the postwar demand for greater energy resources. That effort culminated in the Columbia River Treaty, an international agreement between Canada and the United States for the cooperative development of water resources regulation in the upper Columbia River Basin. It was signed in 1961 and implemented in 1964.

  12. District of Columbia - Compare - U.S. Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    (EIA) District of Columbia District of Columbia

  13. District of Columbia - Rankings - U.S. Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    (EIA) District of Columbia District of Columbia

  14. District of Columbia - Search - U.S. Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    (EIA) District of Columbia District of Columbia

  15. The Columbia River System Inside Story

    SciTech Connect (OSTI)

    2001-04-01

    The Columbia River is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Pacific Northwestfrom fostering world-famous Pacific salmon to supplying clean natural fuel for 50 to 65 percent of the regions electrical generation. Since early in the 20th century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system.

  16. The Columbia River System : the Inside Story.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    The Columbia Ricer is one of the greatest natural resources in the western United States. The river and its tributaries touch the lives of nearly every resident of the Northwest-from providing the world-famous Pacific salmon to supplying the clean natural fuel for over 75 percent of the region's electrical generation. Since early in the century, public and private agencies have labored to capture the benefits of this dynamic river. Today, dozens of major water resource projects throughout the region are fed by the waters of the Columbia Basin river system. And through cooperative efforts, the floods that periodically threaten developments near the river can be controlled. This publication presents a detailed explanation of the planning and operation of the multiple-use dams and reservoirs of the Columbia River system. It describes the river system, those who operate and use it, the agreements and policies that guide system operation, and annual planning for multiple-use operation.

  17. British Biogen | Open Energy Information

    Open Energy Info (EERE)

    search Name: British Biogen Place: London, United Kingdom Zip: SW1X 8PQ Sector: Bioenergy Product: British BioGen is the Trade Association to the UK Bioenergy Industry....

  18. Columbia River Treaty 2014/2024 Review Phase 1 Report

    SciTech Connect (OSTI)

    2010-07-01

    Under the Columbia River Treaty (Treaty or CRT) of 1964, Canada and the United States (U.S.) jointly regulate and manage the Columbia River as it flows from British Columbia into the U.S. The Treaty has provided substantial flood control and power generation benefits to both nations. The Treaty established Canadian and U.S. Entities as implementing agents for each government. British Columbia Hydro and Power Authority (BC Hydro) was designated as the Canadian Entity. The Bonneville Power Administration (BPA) Administrator and the U.S. Army Corps of Engineers (Corps) Division Engineer, Northwestern Division, were designated as the U.S. Entity. The Canadian and U.S. Entities are empowered by their respective governments with broad discretion to implement the existing Columbia River Treaty. They are not, however, authorized to terminate, renegotiate, or otherwise modify the Treaty. In the U.S., authority over international treaties rests with the President, assisted in foreign relations and international negotiations by the Department of State and subject in certain cases to the advice and consent of the U.S. Senate. In Canada, international treaties are within the prerogative of the executive branch of the federal government. Under current policy, treaties are tabled in the House of Commons, and are subject to a waiting period before the executive branch brings the treaty into effect. In the case of the Columbia River Treaty, Canada has assigned certain rights and obligations relating to the Treaty to British Columbia pursuant to the Canada-B.C. Agreement. The Phase 1 report is provided to those respective governmental bodies to support possible independent and/or joint decisions that may be made with respect to the future of the Treaty. The Treaty contains two important provisions that take effect on and after September 16, 2024, that could impact the current power and flood control benefits: 1. Canadian flood control obligations automatically change from a pre-determined annual operation to a Called Upon operation. 2. The year 2024 is the earliest date that either Canada or the U.S. can terminate most of the provisions of the Treaty, with a minimum 10-years advance written notice. Hence, September 16, 2014, is the latest date that either nation could provide notice of intent to terminate and still have the termination effective at its earliest possible date in 2024. While termination would end most Treaty obligations, Called Upon flood control and Libby coordination provisions will continue regardless of termination. However, it is important to note that the Treaty has no end date and absent either country using the termination option will continue indefinitely.

  19. British nuclear policymaking

    SciTech Connect (OSTI)

    Bowie, C.J.; Platt, A.

    1984-01-01

    This study analyzes the domestic political, economic, and bureaucratic factors that affect the nuclear policymaking process in Great Britain. Its major conclusion is that, although there have been changes in that process in recent years (notably the current involvement of a segment of the British public in the debate about the deployment of intermediate-range nuclear forces), future British nuclear policymaking will remain much what it has been in the past. Three ideas are central to understanding British thinking on the subject: (1) Britain's long-standing resolve to have her own national nuclear force is largely traceable to her desire to maintain first-rank standing among the nations of the world in spite of loss of empire. (2) Financial considerations have always been important--so much so that they have usually dominated issues of nuclear policy. (3) The executive branch of government dominates the nuclear policymaking process but does not always present a united front. The United States heavily influences British nuclear policy through having supplied Britain since the late 1950s with nuclear data and components of nuclear weapon systems such as Polaris and Trident. The relationship works both ways since the U.S. depends on Britain as a base for deployment of both conventional and nuclear systems.

  20. British coal privatization procedures

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The form in which British Coal is to be privatized has finally been announced. Offers are to be invited for the operating underground and opencast mines which will be grouped into five regionally based companies. Additionally, offers will be invited for a number of collieries which are currently under care and maintenance. The five Regional Coal Companies to be formed are Central North, which will comprise the assets in the Yorkshire and Durham coalfields, including the five collieries in the Selby Complex; Central South, which will contain the assets located in the Nottinghamshire, Leicestershire, Derbyshire, and Warwickshire coalfields; North East, which has four opencast sites, Scotland, which has nine operating open-cast sites and a single underground mine, Longannet; and South Wales with its nine operating opencast sites. Tower colliery, the last underground mine in South Wales, was finally put on care and maintenance on April 20, 1994. Details of the five Regional Coal Companies are given. A new public sector body, the Coal Authority will be set up to which all British Coal's title to unworked coal and coal mines will be transferred. All the relevant property rights and liabilities of British Coal will be transferred into the Regional Coal Companies prior to their sun.

  1. British Hydropower Association | Open Energy Information

    Open Energy Info (EERE)

    British Hydropower Association Place: Wimborne, Dorset, United Kingdom Zip: BH21 1QU Sector: Hydro Product: The British Hydropower Association (BHA) is a trade association which...

  2. British Energy Renewables | Open Energy Information

    Open Energy Info (EERE)

    Energy, Wind energy Product: Renewables division of British Energy. Involved in the Lewis Wind Farm project. References: British Energy Renewables1 This article is a stub....

  3. Solar Energy Sources SES Solar Inc formerly Electric Network...

    Open Energy Info (EERE)

    SES Solar Inc formerly Electric Network com Jump to: navigation, search Name: Solar Energy Sources - SES Solar Inc (formerly Electric Network.com) Place: Vancouver, British...

  4. 1,"Elm Road Generating Station","Coal","Wisconsin Electric Power...

    U.S. Energy Information Administration (EIA) Indexed Site

    summer capacity (MW)" 1,"Elm Road Generating Station","Coal","Wisconsin Electric Power ... Electric Power Co",1190 4,"Columbia (WI)","Coal","Wisconsin Power & Light ...

  5. Columbia Boulevard Wastewater Treatment Plant

    SciTech Connect (OSTI)

    2005-08-01

    This is a combined heat and power (CHP) project profile on 320 kW fuel cell and microturbine power plants at Columbia Boulevard Wastewater Treatment Plant in Portland, Oregon.

  6. District of Columbia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    (District of Columbia) Glacial Energy Holdings (District of Columbia) Hess Retail Natural Gas and Elec. Acctg. (District of Columbia) Integrys Energy Services, Inc. (District...

  7. ColumbiaGrid Forum

    Office of Environmental Management (EM)

    2012 National Electric Transmission Congestion Study Workshop Marv Landauer December 13, 2011 2 Northwest Congestion 2006 DOE Congestion Study identified: * "Seattle to Portland" as a Congestion area of Concern * Montana-Wyoming as a Conditional Congestion Area due to potential for coal and wind resource development * Projects are being pursued to relieve Seattle to Portland congestion (Castle Rock-Troutdale line) and Montana-NW congestion (Colstrip Upgrades) 3 Northwest Congestion

  8. Written Testimony of Wes Kelley Executive Director Columbia Power & Water Systems

    Broader source: Energy.gov (indexed) [DOE]

    Testimony of Wes Kelley Executive Director Columbia Power & Water Systems Columbia, Tennessee Before the Department of Energy, Quadrennial Energy Review Public Meeting #10: Electricity Transmission, Storage and Distribution - East September 8, 2014 Secretary Moniz, it is a pleasure to be here today to speak about the challenges and opportunities facing distribution utilities, especially with the advent and rapid growth of distributed energy resources (DERs). My name is Wes Kelley, and I

  9. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    SciTech Connect (OSTI)

    Allee, Brian J.

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  10. British Photovoltaic Association | Open Energy Information

    Open Energy Info (EERE)

    Photovoltaic Association Jump to: navigation, search Name: British Photovoltaic Association Place: Milton Keynes, United Kingdom Zip: MK5 8NG Product: Trade body for the PV...

  11. Columbia River Component Data Evaluation Summary Report

    SciTech Connect (OSTI)

    C.S. Cearlock

    2006-08-02

    The purpose of the Columbia River Component Data Compilation and Evaluation task was to compile, review, and evaluate existing information for constituents that may have been released to the Columbia River due to Hanford Site operations. Through this effort an extensive compilation of information pertaining to Hanford Site-related contaminants released to the Columbia River has been completed for almost 965 km of the river.

  12. MassSAVE (Electric) - Residential Energy Efficiency Programs...

    Broader source: Energy.gov (indexed) [DOE]

    include Columbia Gas of Massachusetts, The Berkshire Gas Company, Cape Light Compact, National Grid, New England Gas Company, NSTAR, Unitil, and Western Massachusetts Electric...

  13. MassSAVE (Electric) - Commercial Retrofit Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    include Columbia Gas of Massachusetts, The Berkshire Gas Company, Cape Light Compact, National Grid, New England Gas Company, NSTAR, Unitil, and Western Massachusetts Electric...

  14. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    District of Columbia Electricity Profile 2013 Table 1. 2013 Summary statistics (District of Columbia) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 9 51 Electric utilities IPP & CHP 9 51 Net generation (megawatthours) 65,852 51 Electric utilities IPP & CHP 65,852 51 Emissions Sulfur dioxide (short tons) 0 51 Nitrogen oxide (short tons) 148 51 Carbon dioxide (thousand metric tons) 49 50 Sulfur dioxide (lbs/MWh) 0.0 51 Nitrogen oxide (lbs/MWh) 4.5 3

  15. New Columbia River Estuary purchases benefit salmon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the mouth of the Columbia River to permanently protect riverside habitat for Northwest fish and wildlife, including threatened and endangered salmon and steelhead. The...

  16. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  17. U. 5. COLUMBIA RIVER POWER SYS1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12,800,000 to the reclamation fund in the United States Treasury for the account of Columbia Basin Project, Yakima Project...

  18. Columbia, Missouri: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    County, Missouri. It falls under Missouri's 9th congressional district.12 Registered Energy Companies in Columbia, Missouri AFuels Technologies LLC Renewable Alternatives LLC...

  19. Columbia Gas of Ohio- Residential Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia Gas of Ohio (CGO) offers energy efficiency rebates for furnaces, boilers, and customers that enroll in the Home Performance Solutions Program. 

  20. Columbia Water & Light- Residential HVAC Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water & Light (CWL) provides residential customers with rebates on energy efficient HVAC equipment. Customers should submit the mechanical permit from a Protective Inspection, a copy...

  1. Pay-As-You-Drive Pricing in British Columbia | Open Energy Information

    Open Energy Info (EERE)

    build a successful LEDS. How to Use This Tool This tool is most helpful when using these strategies: Avoid - Cut the need for travel Improve - Enhance infrastructure & policies...

  2. British Wind Energy Association BWEA | Open Energy Information

    Open Energy Info (EERE)

    BWEA Jump to: navigation, search Name: British Wind Energy Association (BWEA) Place: London, United Kingdom Zip: N1 0PW Sector: Wind energy Product: The British Wind Energy...

  3. ELECTRIC

    Office of Legacy Management (LM)

    ELECTRIC cdrtrokArJclaeT 3 I+ &i, y$ \I &OF I*- j< t j,fci..- ir )(yiT !E-li, ( \-,v? Cl -p/4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson General ?!!mager Atomic Qxzgy Commission 1901 Constitution Avenue Kashington, D. C. Dear Sir: In the course of OUT nuclenr research we are planning to study the enc:ri;y threshold anti cross section for fission. For thib program we require a s<>piAroted sample of metallic Uranium 258 of high purity. A

  4. Columbia County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Places in Columbia County, Georgia Evans, Georgia Grovetown, Georgia Harlem, Georgia Martinez, Georgia Retrieved from "http:en.openei.orgwindex.php?titleColumbiaCounty,Geor...

  5. Devonshire Energy, LLC (District of Columbia) | Open Energy Informatio...

    Open Energy Info (EERE)

    Devonshire Energy, LLC (District of Columbia) Jump to: navigation, search Name: Devonshire Energy, LLC Place: District of Columbia References: EIA Form EIA-861 Final Data File for...

  6. Washington Gas Energy Services (District of Columbia) | Open...

    Open Energy Info (EERE)

    Washington Gas Energy Services (District of Columbia) Jump to: navigation, search Name: Washington Gas Energy Services Place: District of Columbia References: EIA Form EIA-861...

  7. Hess Retail Natural Gas and Elec. Acctg. (District of Columbia...

    Open Energy Info (EERE)

    Hess Retail Natural Gas and Elec. Acctg. (District of Columbia) Jump to: navigation, search Name: Hess Retail Natural Gas and Elec. Acctg. Place: District of Columbia References:...

  8. Columbia County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Subtype C. Places in Columbia County, Oregon Clatskanie, Oregon Columbia City, Oregon Prescott, Oregon Rainier, Oregon Scappoose, Oregon St. Helens, Oregon Vernonia, Oregon...

  9. EERE Success Story-Columbia Power Technologies, Inc. Deploys...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy EERE Success Story-Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy April 9, ...

  10. Noble Americas Energy Solutions LLC (District of Columbia) |...

    Open Energy Info (EERE)

    District of Columbia) Jump to: navigation, search Name: Noble Americas Energy Solutions LLC Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 -...

  11. Columbia River PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Columbia River PUD offers a variety of rebates to commercial and industrial customers who make energy saving improvements to facilities. Visit Columbia River PUD's website for specific program...

  12. Columbia Water & Light- Home Performance with ENERGY STAR Loan

    Broader source: Energy.gov [DOE]

    The Columbia Water & Light (CWL) Home Performance with ENERGY STAR program allows Columbia residents to finance energy efficiency improvements to homes with affordable, low-interest loans with...

  13. British American Business | Department of Energy

    Energy Savers [EERE]

    British American Business British American Business November 20, 2007 - 4:45pm Addthis Remarks as Prepared for Secretary Bodman Thank you. It's a pleasure to be back speaking to the members of British-American Business. I want to thank Peter Hunt for convening this event and for inviting me to be a part of it. I'm winding up a trip that began in Rome at the World Energy Conference where I and six of my fellow Energy Ministers from around the world shared our views on how to increase the world's

  14. Jonathan Link, Columbia NuCosmo '02

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7-19, 2002 Jonathan Link, Columbia NuCosmo '02 Jonathan Link Columbia University Workshop on Neutrino News from the Lab and the Cosmos October 17-19, 2002 October 17-19, 2002 Jonathan Link, Columbia NuCosmo '02 Outline 1. The LSND Experiment a. The experimental setup b. Results c. Ramifications 2. MiniBooNE a. The BooNE Collaboration b. The beam line and expected neutrino flux c. The MiniBooNE detector d. Expected backgrounds and systematics e. First neutrino events, and cosmic rays f.

  15. Jonathan Link, Columbia KEK Topical Conference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -22, 2001 Jonathan Link, Columbia KEK Topical Conference Short Baseline Neutrino Oscillations and MiniBooNE Jonathan Link Columbia University The 5 th KEK Topical Conference - Frontiers in Flavor Physics November 20-22, 2001 November 20-22, 2001 Jonathan Link, Columbia KEK Topical Conference Outline 1. Background on Short Baseline Neutrino Oscillations * A little neutrino physics * The LSND oscillation result 2. About MiniBooNE 3. Status of MiniBooNE. Some of you may have noticed that I'll be

  16. BPA research aids Columbia River white sturgeon

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    research aids Columbia River white sturgeon 8142015 12:00 AM Tweet Page Content BPA fish biologist Scott Bettin (left) and Brad Cady of the Washington Dept. of Fish and...

  17. Columbia Power System | Open Energy Information

    Open Energy Info (EERE)

    931-388-4833 Website: www.cpws.com Facebook: https:www.facebook.compagesColumbia-Power-Water-Systems123897314290346 Outage Hotline: 931-388-4833 References: EIA Form...

  18. Columbia River Component Data Gap Analysis

    SciTech Connect (OSTI)

    L. C. Hulstrom

    2007-10-23

    This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

  19. Columbia University | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Columbia University Columbia University Professor Michael Mauel PPPL Engineer Steve Raftopoulos assisted Professor Mike Mauel with the upgrade of the HBT-EP experiment. The upgrade involved installing a new conducting first wall shell that is instrumented with magnetic sensor arrays. The HBT-EB research required these components to be installed with greater precision, and Professor Mauel asked for the assistance of PPPL's metrology engineers and equipment. The stabilization of MHD in HBT-EB will

  20. Mid-Columbia Region Clean Energy Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    93 -VA Revision 0 Mid-Columbia Region Clean Energy Opportunities Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management P.O. Box 550 Richland, Washington 99352 Approved for Public Release; Further Dissemination Unlimited DOE-0393 -VA Revision 0 Mid-Columbia Region Clean Energy Opportunities D. R. Bratzel, Energy Initiatives Mission Support Alliance Date Published February 2012 To be Presented at Business Development Briefing RL Site Stewardship Division

  1. Director, health Physics Office Columbia University

    Office of Legacy Management (LM)

    f. 3 -J Mr. Philip tori0 Director, health Physics Office Columbia University 289 Engineering Terrace 520 West 120th Street New York, New York 10027 NY.3 "I A\, 4 f- ' :""5 . . ;. ,_ i._ ' L, Dear Mr. Lorio: The Department of Energy (DOE), as part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), has reviewed information on Columbia University facilities to determine whether they contain residual radioactivity traceable to activities conducted on behalf of the

  2. Letter from Pepco Holdings Regarding the Reliability of Electric Service in

    Energy Savers [EERE]

    the District of Columbia | Department of Energy from Pepco Holdings Regarding the Reliability of Electric Service in the District of Columbia Letter from Pepco Holdings Regarding the Reliability of Electric Service in the District of Columbia Docket No. EO-05-01: I am writing to alert you to our concerns regarding the reliability of electricity service for the Nation's Capital in light of the recent shutdown of the Potomac River Generating Station in Alexandria, Virginia. The plant shutdown

  3. Bonneville Power Administration- The Power of The Columbia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power of the Columbia Our site is here to showcase the mighty Columbia River. We'll explore some of the history, beauty and magnificence of the northwest's great natural resource,...

  4. Columbia Power Technologies, Inc. Deploys its Direct Drive Wave...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy April 9, 2013 - 12:00am ...

  5. Comments of the District of Columbia Public Service Commission...

    Energy Savers [EERE]

    Comments of the District of Columbia Public Service Commission Comments of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-06-1,...

  6. 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electricity transmission, and power storage. The team, which includes scientists from Cambridge University, the University of British Columbia, and the National High Magnetic Field...

  7. CERTIFICATION DOCKET FOR COLUMBIA UNIVERSITY NEW YORK, NEW YORK

    Office of Legacy Management (LM)

    COLUMBIA UNIVERSITY NEW YORK, NEW YORK Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Introduction to the Certification Docket for Columbia University, New York, New York Purpose Docket Contents Exhibit I: Summary of Activities at the Columbia University, New York, New York Exhibit II: Documents Supporting the Certification of the Columbia University, New York, New York Page I-l II- 1 . . . 111

  8. Alternative Fuels Data Center: District of Columbia Transportation Data for

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Alternative Fuels and Vehicles District of Columbia Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: District of Columbia Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: District of Columbia Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: District of Columbia Transportation Data for Alternative Fuels and

  9. Alternative Fuels Data Center: District of Columbia's Government Fleet Uses

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    a Wide Variety of Alternative Fuels District of Columbia's Government Fleet Uses a Wide Variety of Alternative Fuels to someone by E-mail Share Alternative Fuels Data Center: District of Columbia's Government Fleet Uses a Wide Variety of Alternative Fuels on Facebook Tweet about Alternative Fuels Data Center: District of Columbia's Government Fleet Uses a Wide Variety of Alternative Fuels on Twitter Bookmark Alternative Fuels Data Center: District of Columbia's Government Fleet Uses a Wide

  10. District of Columbia Recovery Act State Memo | Department of Energy

    Office of Environmental Management (EM)

    District of Columbia Recovery Act State Memo District of Columbia Recovery Act State Memo The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in the District of Columbia reflect a broad range of clean energy projects, from energy efficiency and the smart grid to renewable energy and advanced battery manufacturing. Through these investments, the District of Columbia's businesses,

  11. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  12. District of Columbia Natural Gas Deliveries to Electric Power Consumers

    Gasoline and Diesel Fuel Update (EIA)

    (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 0 0 0 2000's 0 0 0 -- -- -- -- -- -- -- 2010's -- 1,003 W

  13. Microsoft Word - Columbia Generating Station Electric Rev Bonds...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tax Reform Act of 1986, as amended (the "1986 Act") and Section 103 of the Internal Revenue Code of 1986, as amended (the "1986 Code"). In the further opinion of Special Tax...

  14. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix F: Irrigation, Municipal and Industrial/Water Supply.

    SciTech Connect (OSTI)

    Columbia River System Operations Review; United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    Since the 1930`s, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M&I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M&I studies; Irrigation/M&I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M&I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement.

  15. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  16. Columbia Gas of Virginia- Business Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Columbia Gas of Virginia offers rebates to commercial customers for the purchase and installation of energy efficient equipment. Water heaters, furnaces, boilers, controls, and infrared heaters are...

  17. Columbia Water & Light- HVAC and Lighting Efficiency Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water & Light (CWL) offers rebates to its commercial and industrial customers for the purchase of high efficiency HVAC installations and efficient lighting. Incentives for certain...

  18. Columbia Gas of Kentucky- Home Savings Rebate Program

    Broader source: Energy.gov [DOE]

    Columbia Gas of Kentucky offers rebates to residential customers for the purchase and installation of energy efficient appliances and equipment. These programs include:

  19. Pepco and PJM Interconnection Comments on District of Columbia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Pepco and PJM Interconnection Comments on District of Columbia Public ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  20. District of Columbia Public Service Commission. Docket No. EO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  1. Response of the District of Columbia Public Service Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Response of the District of Columbia Public Service Commission More ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  2. Emergency Petition and Complaint of District of Columbia Public...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and Complaint to avert the impending shutdown of the Potomac River Generating Station power ...

  3. District of Columbia Natural Gas Percent Sold to The Commercial...

    U.S. Energy Information Administration (EIA) Indexed Site

    by Local Distribution Companies (Percent) District of Columbia Natural Gas Percent Sold to The Commercial Sectors by Local Distribution Companies (Percent) Decade Year-0 ...

  4. District of Columbia Price of Natural Gas Delivered to Commercial...

    U.S. Energy Information Administration (EIA) Indexed Site

    Local Distributor Companies (Dollars per Thousand Cubic Feet) District of Columbia Price of Natural Gas Delivered to Commercial Sectors by Local Distributor Companies (Dollars per ...

  5. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect (OSTI)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  6. EA-2006: Columbia Estuary Ecosystem Restoration Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration and the U.S. Army Corps of Engineers are jointly preparing a programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence through breaching dikes and levees; partial reconnection of tidal influence through culverts, bridges, and tidegates; enhancement of the quantity and quality of tidal channels; removal of invasive species; and restoration of riparian habitat conditions, such as planting native vegetation.

  7. Nevis Cyclotron Laboratories Columbia University Physics Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevis Cyclotron Laboratories Columbia University Physics Department Irvington-on-Hudson, New York WEAK INTERACTIONS T. D. Lee CU-144-57-ONR-110-l-Physics Reproduction in whole or in part is permitted for any purpose of the United States Government June, 1957 Joint ONR-AEC Program Office of Naval Research Contract Contract N6-ori-110-Task No. 1 Contract AT(30-1)-1932 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the

  8. Washington Nuclear Profile - Columbia Generating Station

    U.S. Energy Information Administration (EIA) Indexed Site

    Columbia Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 2,"1,097","9,241",96.2,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,"1,097","9,241",96.2

  9. Pacific Northwest Electric Power Planning and Conservation Act : Legislative History of the Act to Assist the Electrical Consumers of the Pacific Northwest through use of the Federal Columbia River Power System to Achieve Cost-Effective Energy Conservation : P.L. 96-501, 94 Stat. 2697.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1981-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act became effective when it was signed into law by President Carter on December 5, 1980. This ended a four-year debate over legislation designed to plan and coordinate the region's energy future. This legislative history is an abbreviated version taken from the larger historical file maintained by the BPA Law Library. It is intended to assist BPA personnel and others who are studying the Northwest Power Act and working on its implementation. The documents included were selected for their value in determining what Congress meant in enacting the statute and to provide the researcher with a starting point for further investigation. These documents include: a history of the Act, a chronology of the legislative action leading to passage of the law; a section-by-section analysis of the Act; the Congressional Records of Senate and House debates on the bill and its amendments, and a list of Congressional committee hearings.

  10. Emergency Petition and Complaint of District of Columbia Public Service

    Energy Savers [EERE]

    Commission | Department of Energy Petition and Complaint of District of Columbia Public Service Commission Emergency Petition and Complaint of District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Sections 202(c), 207 and 309 of the Federal Power Act ("FPA"), 16 U.S.C. §§ 824a(c), 824f and 825h, the District of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and Complaint to avert the impending shutdown of

  11. Using Electricity",,,"Electricity Consumption",,,"Electricity...

    U.S. Energy Information Administration (EIA) Indexed Site

    . Total Electricity Consumption and Expenditures, 2003" ,"All Buildings* Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number of Buildings...

  12. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

  13. Direct Energy Services (District of Columbia) | Open Energy Informatio...

    Open Energy Info (EERE)

    Direct Energy Services Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 54820 This article is a stub....

  14. Glacial Energy Holdings (District of Columbia) | Open Energy...

    Open Energy Info (EERE)

    Glacial Energy Holdings Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 54871 This article is a stub....

  15. PEPCO Energy Services (District of Columbia) | Open Energy Information

    Open Energy Info (EERE)

    PEPCO Energy Services Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 14405 This article is a stub....

  16. UGI Energy Services, Inc. (District of Columbia) | Open Energy...

    Open Energy Info (EERE)

    UGI Energy Services, Inc. Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 56408 This article is a...

  17. EIS-0170: Columbia River System Operation Review, BPA Area

    Broader source: Energy.gov [DOE]

    The Columbia River System Operation Review Final Environmental Impact Statement (EIS) evaluates the potential impacts of four alternatives that represent the likely range of allocations between the Federal and non-Federal projects.

  18. Columbia Water & Light- New Home ENERGY STAR Rebate

    Broader source: Energy.gov [DOE]

    Columbia Water and Light offers a $1,000 rebate to customers for the construction of new homes that achieve certification as Energy Star homes. The Energy Star designation is given to homes that...

  19. Columbia County, Arkansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    is a stub. You can help OpenEI by expanding it. Columbia County is a county in Arkansas. Its FIPS County Code is 027. It is classified as ASHRAE 169-2006 Climate Zone Number 3...

  20. Columbia Water & Light- Home Performance with ENERGY STAR Rebates

    Broader source: Energy.gov [DOE]

    Columbia Water and Light, a municipal utility, offers rebates to its residential customers who make certain energy efficient improvements to the home. Under the Home Performance with Energy Star...

  1. Washington, District of Columbia: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Washington is a city in the District of Columbia.1 Contents 1 US Recovery Act Smart Grid Projects in...

  2. District of Columbia Natural Gas Industrial Price (Dollars per Thousand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cubic Feet) District of Columbia Natural Gas Industrial Price (Dollars per Thousand Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 -- -- -- -- -- -- -- -- -- -- -- -- 2002 -- -- -- -- -- -- -- -- -- -- -- -- 2003 -- -- -- -- -- -- -- -- -- -- -- -- 2004 -- -- -- -- -- -- -- -- -- -- -- -- 2005 -- -- -- -- -- -- -- -- -- -- -- -- 2006 -- -- -- -- -- -- -- -- -- -- -- -- 2007 -- -- -- -- -- -- -- -- -- -- -- -- 2008 -- -- -- -- -- -- -- -- -- -- -- -- 2009 -- -- -- -- --

  3. Columbia Power Coop Assn Inc | Open Energy Information

    Open Energy Info (EERE)

    search Name: Columbia Power Coop Assn Inc Place: Oregon Phone Number: HEPPNER OFFICE: 541-676-9146; CONDON OFFICE: 541-384-2023 Website: www.cbec.cc Outage Hotline:...

  4. American PowerNet (District of Columbia) | Open Energy Information

    Open Energy Info (EERE)

    American PowerNet Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 49730 This article is a stub. You...

  5. Endeavour Launch 4: From Columbia to Atlantis | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    From Columbia to Atlantis Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on...

  6. Consolidated Edison Sol Inc (District of Columbia) | Open Energy...

    Open Energy Info (EERE)

    Consolidated Edison Sol Inc Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 4191 This article is a...

  7. Suez Energy Resources North America (District of Columbia) |...

    Open Energy Info (EERE)

    Suez Energy Resources North America Place: District of Columbia References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data Utility Id 19107 This...

  8. New Resin Brings Efficiencies to Groundwater Treatment along Columbia River

    Energy Savers [EERE]

    at Hanford Site | Department of Energy Brings Efficiencies to Groundwater Treatment along Columbia River at Hanford Site New Resin Brings Efficiencies to Groundwater Treatment along Columbia River at Hanford Site June 1, 2012 - 12:00pm Addthis Dean Neshem, a pump-and-treat operations and maintenance engineer, observes operations at one of the Hanford site's five groundwater treatment facilities. Based on technical recommendations from DOE, CH2M HILL engineers tested and compared multiple

  9. EA-1998: Upper Columbia Spring Chinook and Steelhead Acclimation Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chelan County, Washington | Department of Energy EA-1998: Upper Columbia Spring Chinook and Steelhead Acclimation Project, Chelan County, Washington EA-1998: Upper Columbia Spring Chinook and Steelhead Acclimation Project, Chelan County, Washington SUMMARY BPA is preparing an EA that will analyze the potential impacts of a proposal to fund the Yakama Nation to improve, develop, and use fish rearing acclimation ponds for hatchery raised steelhead and Chinook salmon in the Methow and Wenatchee

  10. EM's Richland Operations Office Completes Chromium Cleanup along Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River | Department of Energy Richland Operations Office Completes Chromium Cleanup along Columbia River EM's Richland Operations Office Completes Chromium Cleanup along Columbia River September 24, 2015 - 12:25pm Addthis The inset photo shows Hanford's D and DR Reactor area during operations in the 1950s, and the larger photo shows how the site looked during final backfill activities earlier this year after a chromium contamination cleanup project. The inset photo shows Hanford's D and DR

  11. DOE - Office of Legacy Management -- Columbia University - NY 03

    Office of Legacy Management (LM)

    Columbia University - NY 03 FUSRAP Considered Sites Site: Columbia University (NY.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.03-1 Evaluation Year: 1985 NY.03-2 NY.03-3 Site Operations: Early research and development -- nuclear chain reaction (fission) and gaseous diffusion during the 1940s. NY.03-4 Site Disposition: Eliminated - Radiation levels below criteria - Indication of university sponsored

  12. Columbia basin project, Washington: Adams, Douglas, Franklin, Grant, Lincoln, and Walla Walla Counties

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Columbia Basin Project is a multipurpose development utilizing a portion of the resources of the Columbia River in the central part of the State of Washington. The key structure, Grand Coulee Dam, is on the main stem of the Columbia River about 90 miles west of Spokane, Wash. The extensive irrigation works extend southward on the Columbia Plateau 125 miles to the vicinity of Pasco, Wash., where the Snake and Columbia Rivers join.

  13. Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1994-02-01

    The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

  14. Energy Intensity Indicators: Electricity Generation Energy Intensity |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Electricity Generation Energy Intensity Energy Intensity Indicators: Electricity Generation Energy Intensity A kilowatt-hour (kWh) of electric energy delivered to the final user has an energy equivalent to 3,412 British thermal units (Btu). Figure E1, below, tracks how much energy was used by the various categories of electricity generators to produce a kWh of electricity (i.e., the heat rate). As shown in the figure, in 1950, central power plants producing only

  15. Electricity Prices in Transition (released in AEO2007)

    Reports and Publications (EIA)

    2007-01-01

    The push by some states to restructure electricity markets progressed rapidly throughout the late 1990s. Although the energy crisis in California during 2000 and 2001 slowed the momentum, 19 states and the District of Columbia currently have some form of restructuring in place. In addition, Washington State, which has not restructured its electricity market, allows its largest industrial customers to choose their suppliers.

  16. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.

  17. Data Compendium for the Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    Eslinger, P.W.; Huesties, L.R.; Maughan, A.D.; Miley, T.B.; Walters, W.H.

    1994-04-01

    The Columbia River Comprehensive Impact Assessment (CRCIA). The CRCIA is conducted by the Pacific Northwest Laboratory (PNL). The purpose of the CRCIA is to evaluate the current human and ecological risk from the Columbia River attributable to past and present activities on the Hanford Site. Human risk will be addressed for radioactive and hazardous materials over a range of river use options. Ecological risk will be evaluated relative to the health of the current river ecosystem. The initial effort for the CRCIA is the development of a compendium of existing data on Columbia River contamination. This document provides the data compendium. It also includes a discussion of data sources, descriptions of the physical format of the data, and descriptions of the search process used to identify data.

  18. Using Electricity",,,"Electricity Consumption",,,"Electricity...

    U.S. Energy Information Administration (EIA) Indexed Site

    A. Total Electricity Consumption and Expenditures for All Buildings, 2003" ,"All Buildings Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number of...

  19. Electricity",,,"Electricity Consumption",,,"Electricity Expenditures...

    U.S. Energy Information Administration (EIA) Indexed Site

    C9. Total Electricity Consumption and Expenditures, 1999" ,"All Buildings Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number of Buildings...

  20. Electricity",,,"Electricity Consumption",,,"Electricity Expenditures...

    U.S. Energy Information Administration (EIA) Indexed Site

    DIV. Total Electricity Consumption and Expenditures by Census Division, 1999" ,"All Buildings Using Electricity",,,"Electricity Consumption",,,"Electricity Expenditures" ,"Number...

  1. ARM - Field Campaign - Columbia Basin Wind Energy Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsColumbia Basin Wind Energy Study Campaign Links Outsmarting the Wind -- U.S. News Science Old meteorological techniques used in new wind farm study -- EcoSeed ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Columbia Basin Wind Energy Study 2010.09.27 - 2011.05.31 Lead Scientist : Larry Berg For data sets, see below. Abstract The primary focus of this study was to obtain a multi-season data set

  2. Pepco and PJM Interconnection Comments on District of Columbia Public

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing | Department of Energy Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the

  3. EIS-0425: Mid-Columbia Coho Restoration, Washington

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of DOEs Bonneville Power Administrations proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

  4. British architectural concepts of natural ventilation

    SciTech Connect (OSTI)

    Cook, J.

    1997-12-31

    Recent large buildings in Britain are reviewed for their demonstration of programmatic determinates and architectural concepts of natural ventilation, systems that reduce electric use because they use natural convection. In size they range from the 5,000 square feet of Darwin College at Cambridge to the Inland Revenue Center at Nottingham with 400,000 square feet. The mix of passive and conventional mechanical systems of Ionica Office Building, Cambridge suggests the newest strategy of deliberate redundancy in what might better be called assisted natural ventilation. Daylighting, a distinctly different technique is typically coincident. Among the programmatic concepts are unsealed buildings, displacement ventilation, and user preference for immediate environmental control and strong contact with the outdoor environment. Architectural concepts include atriums, exhaust towers, and exposed structural concrete ceilings. These applications reinforce green policies and involve leadership from prominent architects and clients.

  5. Energy Department Awards Will Promote Electric Vehicles in 24 States and Train a Workforce for Advanced Vehicle Development

    Broader source: Energy.gov [DOE]

    Washington, D.C. - U.S. Energy Secretary Steven Chu today announced 16 projects supporting activities in 24 states and the District of Columbia to accelerate the adoption of electric vehicles (EVs)...

  6. DOE - Office of Legacy Management -- Teledyne-Columbia-Summerville - PA 01

    Office of Legacy Management (LM)

    Teledyne-Columbia-Summerville - PA 01 FUSRAP Considered Sites Site: TELEDYNE-COLUMBIA-SUMMERVILLE (PA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Columbia Steel, Summerill Tube, Columbia-Summerill PA.01-1 Location: Pittsburgh , Pennsylvania PA.01-1 Evaluation Year: 1987 PA.01-1 Site Operations: Metal fabrication operations. No indication radioactive materials were involved. PA.01-1 Site Disposition: Eliminated - Site was not involved in

  7. Certification of Non-Residence in the District of Columbia | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Certification of Non-Residence in the District of Columbia Certification of Non-Residence in the District of Columbia PDF icon Certification of Non-Residence in the District of Columbia More Documents & Publications Employee In-Processing Forms W4, Federal Withholding Tax Form CX-000155: Categorical Exclusion Determination

  8. Environmental Justice Activities: Community Leaders' Institute, West Columbia, South Carolina

    Broader source: Energy.gov [DOE]

    The Midlands Community Leaders’ Institute (CLI), sponsored by the Medical University of South Carolina, U.S. Department of Energy, U.S. Department of Defense, South Carolina State University, and Brookland Baptist Church was held in West Columbia, South Carolina, on July 13 and 14, 2012.

  9. Columbia River : Terminal Fisheries Research Report : Annual Report 1994.

    SciTech Connect (OSTI)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1996-12-01

    In 1993 the Northwest Power Planning Council recommended in its Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin.

  10. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  11. District of Columbia Natural Gas Summary

    Gasoline and Diesel Fuel Update (EIA)

    82-2005 Citygate -- -- -- -- -- -- 1989-2015 Residential 13.53 13.06 12.10 12.45 13.05 12.52 1980-2015 Commercial 12.26 12.24 11.19 11.64 12.18 11.55 1980-2015 Industrial -- -- -- -- -- -- 2001-2015 Vehicle Fuel 4.87 4.17 9.38 1995-2012 Electric Power -- 4.96 -- -- -- -- 2001-2015 Consumption (Million Cubic Feet) Total Consumption 33,251 32,862 28,561 32,743 34,057 1997-2014 Pipeline & Distribution Use 213 1,703 1,068 1,434 1,305 1997-2014 Delivered to Consumers 33,038 31,159 27,493 31,309

  12. District of Columbia Natural Gas Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    -- -- -- -- -- -- 1989-2015 Residential 17.68 18.15 18.17 16.21 12.60 10.70 1989-2015 Commercial 11.15 11.17 11.50 11.68 11.28 10.01 1989-2015 Industrial -- -- -- -- -- -- 2001-2015 Electric Power -- -- -- -- -- -- 2002-2015 Consumption (Million Cubic Feet) Delivered to Consumers 984 1,037 1,072 1,740 2,437 2,907 2001-2015 Residential 242 240 253 520 911 1,335 1989-2015 Commercial 657 711 736 1,135 1,443 1,487 1989-2015 Industrial 0 0 0 0 0 0 2001-2015 Vehicle Fuel 86 86 83 86 83 86 2010-2015

  13. Hanford Exceeds Annual Goal for Cleaning up Groundwater near Columbia River

    Energy Savers [EERE]

    | Department of Energy Exceeds Annual Goal for Cleaning up Groundwater near Columbia River Hanford Exceeds Annual Goal for Cleaning up Groundwater near Columbia River August 28, 2014 - 12:00pm Addthis An aerial photo of Hanford’s 100-D Area along the Columbia River, which is served by one of five pump-and-treat systems along the Columbia River that are helping shrink areas of contaminated groundwater. An aerial photo of Hanford's 100-D Area along the Columbia River, which is served by

  14. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: South Columbia Basin Irrigation District, Pasco, Washington

    SciTech Connect (OSTI)

    Schwartz, L.

    1980-05-01

    The case study concerns two modern human uses of the Columbia River - irrigation aimed at agricultural land reclamation and hydroelectric power. The Grand Coulee Dam has become synonomous with large-scale generation of hydroelectric power providing the Pacific Northwest with some of the least-expensive electricity in the United States. The Columbia Basin Project has created a half-million acres of farmland in Washington out of a spectacular and vast desert. The South Columbia River Basin Irrigation District is seeking to harness the energy present in the water which already runs through its canals, drains, and wasteways. The South District's development strategy is aimed toward reducing the costs its farmers pay for irrigation and raising the capital required to serve the remaining 550,000 acres originally planned as part of the Columbia Basin Project. The economic, institutional, and regulatory problems of harnessing the energy at site PEC 22.7, one of six sites proposed for development, are examined in this case study.

  15. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  16. PROTECTING GROUNDWATER & THE COLUMBIA RIVER AT THE HANFORD SITE

    SciTech Connect (OSTI)

    GERBER, M.S.

    2006-06-29

    Along the remote shores of the Columbia River in southeast Washington state, a race is on. Fluor Hanford, a prime cleanup contractor to the U.S. Department of Energy (DOE) at the Hanford Site, is managing a massive, multi-faceted project to remove contaminants from the groundwater before they can reach the Columbia. Despite the daunting nature and size of the problem--about 80 square miles of aquifer under the site contains long-lived radionuclides and hazardous chemicals--significant progress is being made. Many groups are watching, speaking out, and helping. A large. passionate, diverse, and geographically dispersed community is united in its desire to protect the Columbia River--the eighth largest in the world--and have a voice in Hanford's future. Fluor Hanford and the DOE, along with the US. Environmental Protection Agency (EPA) and the Washington Department of Ecology (Ecology) interact with all the stakeholders to make the best decisions. Together, they have made some remarkable strides in the battle against groundwater contamination under the site.

  17. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  18. Graduate students from two British universities install a critical new

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    diagnostic on NSTX-U | Princeton Plasma Physics Lab Graduate students from two British universities install a critical new diagnostic on NSTX-U By John Greenwald December 21, 2015 Tweet Widget Google Plus One Share on Facebook David Thomas and Jakob Brunner (Photo by Elle Starkman/Office of Communications) David Thomas and Jakob Brunner Gallery: From left: Jakob Brunner and David Thomas, with advisor Prof. Roddy Vann of the University of York on the screen in the center. (Photo by Elle

  19. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Counties, Washington | Department of Energy EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington SUMMARY Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of the Northern Mid-Columbia Joint Project, a 230-kilvolt transmission line proposed by BPA and the Public Utility Districts of Grant, Chelan, and

  20. Microsoft PowerPoint - 2011_1012_Hansen_ColumbiaRiverComponent_Eco.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Component Risk Assessment Volume I: Screening Level Ecological Risk Assessment (DOE/RL-2010-117, Draft A) Ri C id (DOE/RL 2010 117, Draft A) Overview and key findings River Corridor Closure Project River Corridor Closure Project y g O t b 2011 October, 2011 Protecting the Columbia River U.S. Department of Energy Richland Operations Office RIVER CORRIDOR CLOSURE PROJECT Columbia River Component Columbia River Component Ecological Risk Assessment * Scope - Screening level ecological risk

  1. Microsoft PowerPoint - Columbia_River_Corridor_Rev_2_v2.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Columbia River Corridor The Columbia River Corridor projects selected for Recovery A t f di i l d d li hi f iliti di ti Act funding include demolishing facilities, remediating waste sites, and containing and treating contamination in groundwater. The projects support completing cleanup along the Columbia River and shrinking the active area of cleanup to the center of the Hanford Site (the Central Plateau) by 2015 1 of the Hanford Site (the Central Plateau) by 2015. May 2009 Shrinking the

  2. Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy April 9, 2013 - 12:00am Addthis In preparation for a full-scale bay/ocean demonstration and with EERE support, Columbia Power Technologies, Inc. (CPT) deployed an intermediate-scale wave energy converter to demonstrate and validate its direct drive wave energy Buoy technology, which extracts energy from passing waves.

  3. EERE Success Story-Columbia Power Technologies, Inc. Deploys its Direct

    Office of Environmental Management (EM)

    Drive Wave Energy Buoy | Department of Energy Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy EERE Success Story-Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy April 9, 2013 - 12:00am Addthis In preparation for a full-scale bay/ocean demonstration and with EERE support, Columbia Power Technologies, Inc. (CPT) deployed an intermediate-scale wave energy converter to demonstrate and validate its direct drive wave energy Buoy technology,

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix T (Second Continued Volume): Comments & Responses.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This is Appendix T (second continued volume) giving public comments and responses to the final environmental impact statement for the Columbia River System.

  5. Letter from the Department of Energy to the District of Columbia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Letter from the Department of Energy to the District of Columbia Public ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  6. District of Columbia Natural Gas Pipeline and Distribution Use (Million

    U.S. Energy Information Administration (EIA) Indexed Site

    Cubic Feet) (Million Cubic Feet) District of Columbia Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 246 256 244 2000's 243 236 242 470 466 487 464 238 203 177 2010's 213 1,703 1,068 1,434 1,305 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 2/29/2016 Next Release Date: 3/31/2016 Referring Pages:

  7. MiniBooNE Antineutrino Data Van Nguyen Columbia University

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Moriond EW 2008 Coherent NC π 0 Production in the MiniBooNE Antineutrino Data Van Nguyen Columbia University for the MiniBooNE collaboration Moriond EW 2008 2 Moriond EW 2008 At low energy, NC π 0 's can be created through resonant and coherent production:  Resonant NC π 0 production:  Coherent NC π 0 production: (Signature: π 0 which is highly forward-going) NC π 0 Production 3 Moriond EW 2008 Why study coherent NC π 0 production? ➔ NC π 0 events are the dominant bgd to osc

  8. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  10. EIS-0206: Joint NEPA/SEPA Proposed Columbia Wind Farm No. 1, Goldendale, Washington

    Broader source: Energy.gov [DOE]

    Conservation and Renewable Energy Systems (CARES) proposes to construct and operate Columbia Wind Farm No. 1 in the Columbia Hills area, southeast of Goldendale, in Klickitat County, Washington. The U.S. Department of Energys Bonneville Power Administration prepared this statement in order to fulfill its National Environmental Policy Act obligations ahead of signing an agreement with CARES.

  11. Stock Assessment of Columbia River Anadromous Salmonids : Final Report, Volume II, Steelhead Stock Summaries, Stock Transfer Guidelines, Information Needs.

    SciTech Connect (OSTI)

    Howell, Philip J.

    1985-07-01

    This report presents brief descriptions of wild and hatchery-raised steelhead trout stocks in the Columbia River Basin. (ACR)

  12. Columbia River Hatchery Reform System-Wide Report.

    SciTech Connect (OSTI)

    Warren, Dan

    2009-04-16

    The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations for Puget Sound/Coastal Washington hatchery programs, followed by the development in 2005 of a suite of analytical tools to support application of the principles (all reports and tools are available at www.hatcheryreform.us). In 2005, Congress directed the National Oceanic and Atmospheric Administration-Fisheries (NOAA Fisheries) to replicate the Puget Sound and Coastal Washington Hatchery Reform Project in the Columbia River Basin. The HSRG was expanded to 14 members to include individuals with specific knowledge about the Columbia River salmon and steelhead populations. This second phase was initially envisioned as a one-year review, with emphasis on the Lower Columbia River hatchery programs. It became clear however, that the Columbia River Basin needed to be viewed as an inter-connected ecosystem in order for the review to be useful. The project scope was subsequently expanded to include the entire Basin, with funding for a second year provided by the Bonneville Power Administration (BPA) under the auspices of the Northwest Power and Conservation Council's (NPCC) Fish and Wildlife Program. The objective of the HSRG's Columbia River Basin review was to change the focus of the Columbia River hatchery system. In the past, these hatchery programs have been aimed at supplying adequate numbers of fish for harvest as mitigation primarily for hydropower development in the Basin. A new, ecosystem-based approach is founded on the idea that harvest goals are sustainable only if they are compatible with conservation goals. The challenge before the HSRG was to determine whether or not conservation and harvest goals could be met by fishery managers and, if so, how. The HSRG determined that in order to address these twin goals, both hatchery and harvest reforms are necessary. The HSRG approach represents an important change of direction in managing hatcheries in the region. It provides a clear demonstration that current hatchery programs can indeed be redirected to better meet both conservation and harvest goals. For each Columbia River Basin Environmentally Significant Unit (ESU), Distinct Population Segment (MPG) or Major Population Group (MPG) reviewed, the HSRG presents its findings and recommendations in the form of an HSRG solution. This package of recommended changes to current hatchery and harvest program design and operation is intended to demonstrate how the programs could be managed to significantly increase the likelihood of meeting the managers goals for both harvest and conservation of the ESU/DPS/MPG. The 'HSRG solution' also highlights the biological principles that the HSRG believes must form the foundation for successful use of hatcheries and fisheries as management tools.

  13. REGULATORY SIDE-BY-SIDE GOVERNING PERMITTING OF CROSS-BORDER...

    Broader source: Energy.gov (indexed) [DOE]

    & Wildlife CANADA Yukon Yukon Utilities Board Yukon Environmental and Socio-economic Assessment Board * Environment Yukon British Columbia British Columbia Utilities Commission...

  14. Application to Amend Presidential Permit OE Docket No. PP-022...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority

  15. Clean Cities Coalitions Charge Up Plug-In Electric Vehicles | Department of

    Office of Environmental Management (EM)

    Energy Coalitions Charge Up Plug-In Electric Vehicles Clean Cities Coalitions Charge Up Plug-In Electric Vehicles May 9, 2013 - 4:22pm Addthis Workers put the finishing touches on installing a plug-in electric vehicle charger that is part of the West Coast Electric Highway. | Photo courtesy of Columbia-Willamette Clean Cities Coalition. Workers put the finishing touches on installing a plug-in electric vehicle charger that is part of the West Coast Electric Highway. | Photo courtesy of

  16. District of Columbia Natural Gas Price Sold to Electric Power Consumers

    Gasoline and Diesel Fuel Update (EIA)

    (Dollars per Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's -- -- -- -- -- -- -- -- -- 2010's -- 4.96

  17. Federally-Recognized Tribes of the Columbia-Snake Basin.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    1997-11-01

    This is an omnibus publication about the federally-recognized Indian tribes of the Columbia-Snake river basin, as presented by themselves. It showcases several figurative and literal snapshots of each tribe, bits and pieces of each tribe`s story. Each individual tribe or tribal confederation either submitted its own section to this publication, or developed its own section with the assistance of the writer-editor. A federally-recognized tribe is an individual Indian group, or confederation of Indian groups, officially acknowledged by the US government for purposes of legislation, consultation and benefits. This publication is designed to be used both as a resource and as an introduction to the tribes. Taken together, the sections present a rich picture of regional indian culture and history, as told by the tribes.

  18. Supplementation in the Columbia Basin : Summary Report Series : Final Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-12-01

    This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first of a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12)

  19. District of Columbia Natural Gas % of Total Residential Deliveries

    Gasoline and Diesel Fuel Update (EIA)

    (Percent) % of Total Residential Deliveries (Percent) District of Columbia Natural Gas % of Total Residential Deliveries (Percent) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 0.34 0.33 0.32 0.33 0.32 0.29 0.30 2000's 0.31 0.27 0.29 0.30 0.29 0.29 0.26 0.28 0.27 0.28 2010's 0.28 0.26 0.27 0.27 0.28 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 2/29/2016 Next

  20. District of Columbia Natural Gas Residential Consumption (Million Cubic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feet) Residential Consumption (Million Cubic Feet) District of Columbia Natural Gas Residential Consumption (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1989 2,903 2,556 2,762 1,663 1,025 649 507 483 494 655 1,099 2,637 1990 3,258 2,193 1,984 1,522 849 596 490 433 435 542 1,005 1,828 1991 2,703 2,543 2,076 1,493 804 503 460 432 463 587 1,220 2,001 1992 2,683 2,829 2,172 1,820 948 630 469 420 446 642 1,314 2,213 1993 2,768 2,823 2,867 1,641 825 546 437 419 427 588

  1. District of Columbia Natural Gas Total Consumption (Million Cubic Feet)

    Gasoline and Diesel Fuel Update (EIA)

    Total Consumption (Million Cubic Feet) District of Columbia Natural Gas Total Consumption (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 34,105 30,409 32,281 2000's 33,468 29,802 32,898 32,814 32,227 32,085 29,049 32,966 31,880 33,177 2010's 33,251 32,862 28,561 32,743 34,057 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 2/29/2016 Next Release

  2. District of Columbia Natural Gas Input Supplemental Fuels (Million Cubic

    U.S. Energy Information Administration (EIA) Indexed Site

    Feet) Input Supplemental Fuels (Million Cubic Feet) District of Columbia Natural Gas Input Supplemental Fuels (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1960's 0 0 0 1970's 0 0 0 0 0 0 0 0 0 0 1980's 2 1 46 0 0 0 0 0 0 0 1990's 0 0 0 0 0 0 0 0 0 0 2000's 0 0 0 0 0 0 0 0 0 0 2010's 0 0 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 2/29/2016

  3. District of Columbia Natural Gas Pipeline and Distribution Use Price

    U.S. Energy Information Administration (EIA) Indexed Site

    (Dollars per Thousand Cubic Feet) Price (Dollars per Thousand Cubic Feet) District of Columbia Natural Gas Pipeline and Distribution Use Price (Dollars per Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 3.94 4.73 4.37 4.16 3.61 3.02 2.94 3.03 1990's 2.99 2.78 2.95 2.58 2.13 1.97 3.02 2.97 2.52 2.39 2000's 4.63 5.36 NA -- -- -- - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual

  4. Assessing Pacific Lamprey Status in the Columbia River Basin.

    SciTech Connect (OSTI)

    Moser, Mary L.; Close, David A.

    2003-06-01

    In the Columbia River drainage, salmonid-based monitoring programs have historically been used to assess status of both adult and juvenile Pacific lamprey. We compared adult lamprey counts at hydropower dams to recent radiotelemetry results and found that the counts underestimated losses between some dams and overestimated passage times through reservoirs. Count data were not correlated with trap captures of adults conducted in the same area and at the same time, likely due to lamprey-specific behaviors that result in inaccurate counts. We recommend maintenance of traditional count protocols, but emphasize the need for continued research to develop an accurate correction factor to apply to these data. Existing salmonid-based sampling for juvenile lamprey is inadequate and we highlight the need for standardized larval lamprey monitoring that provides both abundance and size distributions. Our electrofishing survey for juvenile lamprey indicated that this technique provides critical information on lamprey recruitment and is feasible over large spatial scales.

  5. Columbia River: Terminal fisheries research project. 1994 Annual report

    SciTech Connect (OSTI)

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  6. Energy Transition Initiative, Island Energy Snapshot - British Virgin Islands (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2015-03-01

    This profile provides a snapshot of the energy landscape of the British Virgin Islands (BVI), one of three sets of the Virgin Island territories in an archipelago making up the northern portion of the Lesser Antilles.

  7. Request for Extension of Order No. 202-05-3 of the District of Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Service Commission | Department of Energy Extension of Order No. 202-05-3 of the District of Columbia Public Service Commission Request for Extension of Order No. 202-05-3 of the District of Columbia Public Service Commission Docket No. EO-05-01. Order No. 202-05-3: Pursuant to Section 202(c) of the Federal Power Act ("FPA"),1 16 U.S.C. § 824a(c), the District of Columbia Public Service Commission ("DCPSC") hereby requests that the Secretary of Energy

  8. Emergency Petition and Complaint of the District of Columbia Public Service Commission

    Office of Environmental Management (EM)

    DEPARTMENT OF ENERGY AND FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) EMERGENCY PETITION AND COMPLAINT OF THE DISTRICT OF COLUMBIA PUBLIC SERVICE COMMISSION Pursuant to Sections 202(c), 207 and 309 of the Federal Power Act ("FPA"), 16 U.S.C. §§ 824a(c), 824f and 825h, the District of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and

  9. Recent developments in blast furnace process control within British Steel

    SciTech Connect (OSTI)

    Warren, P.W.

    1995-12-01

    British Steel generally operates seven blast furnaces on four integrated works. All furnaces have been equipped with comprehensive instrumentation and data logging computers over the past eight years. The four Scunthorpe furnaces practice coal injection up to 170 kg/tHM (340 lb/THM), the remainder injecting oil at up to 100 kg/tHM (200 lb/THM). Distribution control is effected by Paul Wurth Bell-Less Tops on six of the seven furnaces, and Movable Throat Armour with bells on the remaining one. All have at least one sub burden probe. The blast furnace operator has a vast quantity of data and signals to consider and evaluate when attempting to achieve the objective of providing a consistent supply of hot metal. Techniques have been, and are being, developed to assist the operator to interpret large numbers of signals. A simple operator guidance system has been developed to provide advice, based on current operating procedures and interpreted data. Further development will involve the use of a sophisticated Expert System software shell.

  10. Potomac Electric Power Co | Open Energy Information

    Open Energy Info (EERE)

    Columbia Service Territory: District of Columbia, Maryland Website: www.pepco.comhome Green Button Access: Implemented Green Button Landing Page: www.pepco.comhomebillin...

  11. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  12. Cost-Effectiveness of ASHRAE Standard 90.1-2010 for the District of Columbia

    SciTech Connect (OSTI)

    Hart, Philip R.; Rosenberg, Michael I.; Xie, YuLong; Zhang, Jian; Richman, Eric E.; Elliott, Douglas B.; Loper, Susan A.; Myer, Michael

    2013-11-29

    Moving to the ANSI/ASHRAE/IES Standard 90.1-2010 version from the Base Code (90.1-2007) is cost-effective for all building types and climate zones in the District of Columbia.

  13. EIS-0163-S: Supplemental EIS/1993 Interim Columbia and Snake Rivers Flow Improvement Measures for Salmon

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers – Walla Walla District has prepared this statement to assess alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. The U.S. Department of Energy’s Bonneville Power Administration served as a cooperating agency in developing this supplement due to its key role in direct operation of the integrated and coordinated Columbia-Snake River System, and adopted this statement in March of 1993. This statement supplements the 1992 Columbia River Salmon Flow Measures Options Analysis Environmental Impact Statement, which evaluated ways to alter water management operations in 1992 on the lower Columbia and Snake rivers to enhance the survival of wild Snake River salmon.

  14. Seasonal Juvenile Salmonid Presence and Migratory Behavior in the Lower Columbia River

    SciTech Connect (OSTI)

    Carter, Jessica A.; McMichael, Geoffrey A.; Welch, Ian D.; Harnish, Ryan A.; Bellgraph, Brian J.

    2009-04-30

    To facilitate preparing Biological Assessments of proposed channel maintenance projects, the Portland District of the U.S. Army Corps of Engineers contracted the Pacific Northwest National Laboratory to consolidate and synthesize available information about the use of the lower Columbia River and estuary by juvenile anadromous salmonids. The information to be synthesized included existing published documents as well as data from five years (2004-2008) of acoustic telemetry studies conducted in the Columbia River estuary using the Juvenile Salmon Acoustic Telemetry System. For this synthesis, the Columbia River estuary includes the section of the Columbia River from Bonneville Dam at river kilometer (Rkm) 235 downstream to the mouth where it enters the Pacific Ocean. In this report, we summarize the seasonal salmonid presence and migration patterns in the Columbia River estuary based on information from published studies as well as relevant data from acoustic telemetry studies conducted by NOAA Fisheries and the Pacific Northwest National Laboratory (PNNL) between 2004 and 2008. Recent acoustic telemetry studies, conducted using the Juvenile Salmon Acoustic Telemetry System (JSATS; developed by the Portland District of the U.S. Army Corps of Engineers), provided information on the migratory behavior of juvenile steelhead (O. mykiss) and Chinook salmon in the Columbia River from Bonneville Dam to the Pacific Ocean. In this report, Section 2 provides a summary of information from published literature on the seasonal presence and migratory behavior of juvenile salmonids in the Columbia River estuary and plume. Section 3 presents a detailed synthesis of juvenile Chinook salmon and steelhead migratory behavior based on use of the JSATS between 2004 and 2008. Section 4 provides a discussion of the information summarized in the report as well as information drawn from literature reviews on potential effects of channel maintenance activities to juvenile salmonids rearing in or migrating through the Columbia River estuary and plume.

  15. Table 10. Supply and disposition of electricity, 1990 through 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    District of Columbia" "megawatthours" "Category", 2013, 2012, 2011, 2010, 2009, 2008, 2007, 2006, 2005, 2004, 2003, 2002, 2001, 2000, 1999, 1998, 1997, 1996, 1995, 1994, 1993, 1992, 1991, 1990 "Supply",,,,,,,,,,,,,,,,,,,,,,,, "Generation",,,,,,,,,,,,,,,,,,,,,,,, " Electric utilities",0,0,71199,0,0,0,0,0,0,0,0,0,0,97423,230003,243975,70661,109809,188862,274252,188452,73991,179814,361043 " Independent power

  16. Columbia River Pathway Dosimetry Report, 1944-1992. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Farris, W.T.; Napier, B.A.; Simpson, J.C.; Snyder, S.F.; Shipler, D.B.

    1994-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of radionuclide emissions since 1944 from the Hanford Site. One objective of the HEDR Project is to estimate doses to individuals who were exposed to the radionuclides released to the Columbia River (the river pathway). This report documents the last in a series of dose calculations conducted on the Columbia River pathway. The report summarizes the technical approach used to estimate radiation doses to three classes of representative individuals who may have used the Columbia River as a source of drinking water, food, or for recreational or occupational purposes. In addition, the report briefly explains the approaches used to estimate the radioactivity released to the river, the development of the parameters used to model the uptake and movement of radioactive materials in aquatic systems such as the Columbia River, and the method of calculating the Columbia River`s transport of radioactive materials. Potential Columbia River doses have been determined for representative individuals since the initiation of site activities in 1944. For this report, dose calculations were performed using conceptual models and computer codes developed for the purpose of estimating doses. All doses were estimated for representative individuals who share similar characteristics with segments of the general population.

  17. Geothermal regime and thermal history of the Llanos Basin, Columbia

    SciTech Connect (OSTI)

    Bachu, S.; Underschultz, J.R.; Ramon, J.C.; Villegas, M.E.

    1995-01-01

    The Llanos basin is a siliciclastic foreland sub-Andean sedimentary basin located in Columbia between the Cordillera Oriental and the Guyana Precambrian shield. Data on bottom-hole temperature, lithology, porosity, and vitrinite reflectance from all 318 wells drilled in the central and southern parts of the basin were used to analyze its geothermal regime and thermal history. Average geothermal gradients in the Llanos basin decrease generally with depth and westward toward the fold and thrust belt. The geothermal regime is controlled by a moderate, generally westward-decreasing basement heat flow, by depositional and compaction factors, and, in places, by advection by formation waters. Compaction leads to increased thermal conductivity with depth, whereas westward downdip flow in deep sandstone formations may exert a cooling effect in the central-western part of the basin. Vitrinite reflectance variation with depth shows a major discontinuity at the pre-Cretaceous unconformity. Areally, vitrinite reflectance increases southwestward in Paleozoic strata and northwestward in post-Paleozoic strata. These patterns indicate that the thermal history of the basin probably includes three thermal events that led to peaks in oil generation: a Paleozoic event in the southwest, a failed Cretaceous rifting event in the west, and an early Tertiary back-arc event in the west. Rapid cooling since the last thermal event is possibly caused by subhorizontal subduction of cold oceanic lithospheric plate.

  18. the District of Columbia Natural Gas Industrial Consumption (Million Cubic

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feet) the District of Columbia Natural Gas Industrial Consumption (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 0 0 0 0 0 0 0 0 0 0 0 0 2002 0 0 0 0 0 0 0 0 0 0 0 0 2003 0 0 0 0 0 0 0 0 0 0 0 0 2004 0 0 0 0 0 0 0 0 0 0 0 0 2005 0 0 0 0 0 0 0 0 0 0 0 0 2006 0 0 0 0 0 0 0 0 0 0 0 0 2007 0 0 0 0 0 0 0 0 0 0 0 0 2008 0 0 0 0 0 0 0 0 0 0 0 0 2009 0 0 0 0 0 0 0 0 0 0 0 0 2010 0 0 0 0 0 0 0 0 0 0 0 0 2011 0 0 0 0 0 0 0 0 0 0 0 0 2012 0 0 0 0 0 0 0 0 0 0 0 0 2013 0 0

  19. District of Columbia Price of Natural Gas Delivered to Residential

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Consumers (Dollars per Thousand Cubic Feet) Delivered to Residential Consumers (Dollars per Thousand Cubic Feet) District of Columbia Price of Natural Gas Delivered to Residential Consumers (Dollars per Thousand Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1989 7.49 7.43 7.72 7.50 7.13 5.91 7.11 6.70 8.60 8.04 7.61 7.31 1990 7.05 7.50 7.70 6.89 7.05 6.51 6.67 6.66 8.29 7.89 7.09 6.83 1991 7.04 7.22 6.90 7.22 7.31 5.96 6.30 6.28 8.31 7.95 7.17 6.93 1992 7.31 7.07 7.23 7.08

  20. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  1. Description of the Columbia Basin Wind Energy Study (CBWES)

    SciTech Connect (OSTI)

    Berg, Larry K.; Pekour, Mikhail S.; Nelson, Danny A.

    2012-10-01

    The purpose of this Technical Report is to provide background information about the Columbia Basin Wind Energy Study (CBWES). This study, which was supported by the U.S. Department of Energy’s Wind and Water Power Program, was conducted from 16 November 2010 through 21 March 2012 at a field site in northeastern Oregon. The primary goal of the study was to provide profiles of wind speed and wind direction over the depth of the boundary layer in an operating wind farm located in an area of complex terrain. Measurements from propeller and vane anemometers mounted on a 62 m tall tower, Doppler Sodar, and Radar Wind Profiler were combined into a single data product to provide the best estimate of the winds above the site during the first part of CBWES. An additional goal of the study was to provide measurements of Turbulence Kinetic Energy (TKE) near the surface. To address this specific goal, sonic anemometers were mounted at two heights on the 62 m tower on 23 April 2011. Prior to the deployment of the sonic anemometers on the tall tower, a single sonic anemometer was deployed on a short tower 3.1 m tall that was located just to the south of the radar wind profiler. Data from the radar wind profiler, as well as the wind profile data product are available from the Atmospheric Radiation Measurements (ARM) Data Archive (http://www.arm.gov/data/campaigns). Data from the sonic anemometers are available from the authors.

  2. State electricity profiles, March 1999

    SciTech Connect (OSTI)

    1999-03-01

    Due to the role electricity plays in the Nation`s economic and social well-being, interested parties have been following the electric power industry`s transition by keeping abreast of the restructuring and deregulation events that are taking place almost daily. Much of the attention centers around the States and how they are restructuring the business of electricity supply within their respective jurisdictions. This report is designed to profile each State and the District of Columbia regarding not only their current restructuring activities, but also their electricity generation and concomitant statistics from 1986 through 1996. Included are data on a number of subject areas including generating capability, generation, revenues, fuel use, capacity factor for nuclear plants, retail sales, and pollutant emissions. Although the Energy Information Administration (EIA) publishes this type of information, there is a lack of a uniform overview for each individual State. This report is intended to help fill that gap and also to serve as a framework for more detailed studies. In addition to basic statistics in tables and graphs, a textual section is provided for each State, discussing some of the points relative to electricity production that are noteworthy in, or unique to, that particular State. Also, each State is ranked according to the place it holds, as compared to the rest of the states, in various relevant areas, such as its average price of electricity per kilowatthour, its population, and its emissions of certain atmospheric pollutants. The final chapter covers the Nation as a whole. 451 figs., 520 tabs.

  3. Electric vehicles

    SciTech Connect (OSTI)

    Not Available

    1990-03-01

    Quiet, clean, and efficient, electric vehicles (EVs) may someday become a practical mode of transportation for the general public. Electric vehicles can provide many advantages for the nation's environment and energy supply because they run on electricity, which can be produced from many sources of energy such as coal, natural gas, uranium, and hydropower. These vehicles offer fuel versatility to the transportation sector, which depends almost solely on oil for its energy needs. Electric vehicles are any mode of transportation operated by a motor that receives electricity from a battery or fuel cell. EVs come in all shapes and sizes and may be used for different tasks. Some EVs are small and simple, such as golf carts and electric wheel chairs. Others are larger and more complex, such as automobile and vans. Some EVs, such as fork lifts, are used in industries. In this fact sheet, we will discuss mostly automobiles and vans. There are also variations on electric vehicles, such as hybrid vehicles and solar-powered vehicles. Hybrid vehicles use electricity as their primary source of energy, however, they also use a backup source of energy, such as gasoline, methanol or ethanol. Solar-powered vehicles are electric vehicles that use photovoltaic cells (cells that convert solar energy to electricity) rather than utility-supplied electricity to recharge the batteries. This paper discusses these concepts.

  4. Natural Gas Storage in Basalt Aquifers of the Columbia Basin, Pacific Northwest USA: A Guide to Site Characterization

    SciTech Connect (OSTI)

    Reidel, Steve P.; Spane, Frank A.; Johnson, Vernon G.

    2002-08-08

    This report provides the technical background and a guide to characterizing a site for storing natural gas in the Columbia River Basalt

  5. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2000 Annual Report.

    SciTech Connect (OSTI)

    DeHart, Michele

    2001-06-01

    The year 2000 hydrosystem operations illustrated two main points: (1) that the NMFS Biological Opinion on the operations of the Federal Columbia River Power System (FCRPS) fish migration measures could not be met in a slightly below average water year, and; (2) the impacts and relationships of energy deregulation and volatile wholesale energy prices on the ability of the FCRPS to provide the Biological Opinion fish migration measures. In 2000, a slightly below average water year, the flow targets were not met and, when energy ''emergencies'' were declared, salmon protection measures were reduced. The 2000 migration year was a below average runoff volume year with an actual run off volume of 61.1 MAF or 96% of average. This year illustrated the ability of the hydro system to meet the migration protection measures established by the NMFS Biological Opinion. The winter operation of storage reservoirs was based upon inaccurate runoff volume forecasts which predicted a January-July runoff volume forecast at The Dalles of 102 to 105% of average, from January through June. Reservoir flood control drafts during the winter months occurred according to these forecasts. This caused an over-draft of reservoirs that resulted in less volume of water available for fish flow augmentation in the spring and the summer. The season Biological Opinion flow targets for spring and summer migrants at Lower Granite and McNary dams were not met. Several power emergencies were declared by BPA in the summer of 2000. The first in June was caused by loss of resources (WNP2 went off-line). The second and third emergencies were declared in August as a result of power emergencies in California and in the Northwest. The unanticipated effects of energy deregulation, power market volatility and rising wholesale electricity prices, and Californian energy deregulation reduced the ability of the FCRPS to implement fish protection measures. A Spill Plan Agreement was implemented in the FCRPS. Under this plan, spill hours were increased at Lower Monumental Dam. Spill volume at The Dalles was reduced and daytime spill tests were conducted at John Day and Bonneville Dams. Although provided for fish, most spill that occurred in 2000 was either in excess of project hydraulic capacity or excess generation. This effectively reduced the actual cost of the spill program. For the most part, spill in 2000 was managed to the waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. Hatchery spring chinook returns comprised an estimated 81.4% of the total spring chinook adult return to Lower Granite Dam. Smolt travel time and survival were similar to past years for most Smolt Monitoring Program groups. The notable exceptions were Snake River hatchery steelhead groups and mid-Columbia hatchery sub-yearling groups from Wells and Ringold hatcheries, which had significantly lower survival than previous years. Yearling chinook travel time showed variation from past years, reflecting the atypical flow shape in 2000 which had high flows in April, declining through May.

  6. Isotopic Tracking of Hanford 300 Area Derived Uranium in the Columbia River

    SciTech Connect (OSTI)

    Christensen, John N.; Dresel, P. Evan; Conrad, Mark E.; Patton, Gregory W.; DePaolo, Donald J.

    2010-10-31

    Our objectives in this study are to quantify the discharge rate of uranium (U) to the Columbia River from the Hanford Site's 300 Area, and to follow that U down river to constrain its fate. Uranium from the Hanford Site has variable isotopic composition due to nuclear industrial processes carried out at the site. This characteristic makes it possible to use high-precision isotopic measurements of U in environmental samples to identify even trace levels of contaminant U, determine its sources, and estimate discharge rates. Our data on river water samples indicate that as much as 3.2 kg/day can enter the Columbia River from the 300 Area, which is only a small fraction of the total load of dissolved natural background U carried by the Columbia River. This very low-level of Hanford derived U can be discerned, despite dilution to < 1 percent of natural background U, 350 km downstream from the Hanford Site. These results indicate that isotopic methods can allow the amounts of U from the 300 Area of the Hanford Site entering the Columbia River to be measured accurately to ascertain whether they are an environmental concern, or are insignificant relative to natural uranium background in the Columbia River.

  7. Electric Vehicles

    ScienceCinema (OSTI)

    Ozpineci, Burak

    2014-07-23

    Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

  8. Electric Vehicles

    SciTech Connect (OSTI)

    Ozpineci, Burak

    2014-05-02

    Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  10. Roles of electricity: Electric steelmaking

    SciTech Connect (OSTI)

    Burwell, C.C.

    1986-07-01

    Electric steel production from scrap metal continues to grow both in total quantity and in market share. The economics of electric-steel production in general, and of electric minimills in particular, seem clearly established. The trend towards electric steelmaking provides significant economic and competitive advantages for producers and important overall economic, environmental, and energy advantages for the United States at large. Conversion to electric steelmaking offers up to a 4-to-1 advantage in terms of the overall energy used to produce a ton of steel, and s similar savings in energy cost for the producer. The amount of old scrap used to produce a ton of steel has doubled since 1967 because of the use of electric furnaces.

  11. Analysis of Chinook Salmon in the Columbia River from an Ecosystem Perspective. Final Report.

    SciTech Connect (OSTI)

    Lichatowich, James A.; Mobrand, Lars E.

    1995-01-01

    Ecosystem Diagnosis and Treatment (EDT) methodology was applied to the analysis of chinook salmon in the mid-Columbia subbasins which flow through the steppe and steppe-shrub vegetation zones. The EDT examines historical changes in life history diversity related to changes in habitat. The emphasis on life history, habitat and historical context is consistent with and ecosystem perspective. This study is based on the working hypothesis that the decline in chinook salmon was at least in part due to a loss of biodiversity defined as the intrapopulation life history diversity. The mid Columbia subbasins included in the study are the Deschutes, John Day, Umatilla, Tucannon and Yakima.

  12. Gas bubble disease in smallmouth bass and northern squawfish from the Snake and Columbia Rivers

    SciTech Connect (OSTI)

    Montgomery, J.C.; Becker, C.D.

    1980-11-01

    Supersaturation of the Columbia and Snake River systems was caused by entrainment of air into water spilling over hydroelectric dams. Total gas saturations of 100% or more have occurred during the spring in each river system. External signs of gas bubble diseases were noted in adult Smallmouth bass and northern squawfish collected from the lower Snake and mid-Columbia rivers during 1975-76. Emboli occurred beneath membranes of the opercula body, and fins of 72% of the smallmouth bass and 84% of the northern squawfish. Hemorrhage was also noted on the caudal, anal, and pectoral fins of several fish.

  13. Development of a high-resolution bathymetry dataset for the Columbia River through the Hanford Reach

    SciTech Connect (OSTI)

    Coleman, Andre M.; Ward, Duane L.; Larson, Kyle B.; Lettrick, Joseph W.

    2010-10-08

    A bathymetric and topographic data collection and processing effort involving existing and newly collected data has been performed for the Columbia River through the Hanford Reach in central Washington State, extending 60-miles from the tailrace of Priest Rapids Dam (river mile 397) to near the vicinity of the Interstate 182 bridge just upstream of the Yakima River confluence (river mile 337). The contents of this report provide a description of the data collections, data inputs, processing methodology, and final data quality assessment used to develop a comprehensive and continuous merged 1m resolution bathymetric and topographic surface dataset for the Columbia River through the Hanford Reach.

  14. District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco

    Energy Savers [EERE]

    Response to the City of Alexandria's Supplemental Comments | Department of Energy District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments Docket No. EO-05-01: In accordance with Order No. 202-06-01, issued by the Department of Energy ("DOE") on February 17, 2006, Potomac

  15. EIS-0163: 1992 Columbia River Salmon Flow Measures Options Analysis/EIS

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers – Walla Walla District prepared this statement to analyze four general alternatives to modify the flow of water in the lower Columbia-Snake River in order to help anadromous fish migrate past eight multipurpose Federal dams. The U.S. Department of Energy’s Bonneville Power Administration served as a cooperating agency due to its key role in direct operation of the integrated and coordinated Columbia-Snake River System, and adopted this statement on February 10, 1992.

  16. Support for City of Alexandria's Comments on the District of Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Service Commission, Docket No. EO-05-01 | Department of Energy Support for City of Alexandria's Comments on the District of Columbia Public Service Commission, Docket No. EO-05-01 Support for City of Alexandria's Comments on the District of Columbia Public Service Commission, Docket No. EO-05-01 Docket No. EO-05-01. In the above referenced order, responding to the D.C. Public Service Commission's petition, several inaccurate statements relating to environmental issues compel attention

  17. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  18. Electric machine

    DOE Patents [OSTI]

    El-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Reddy, Patel Bhageerath (Madison, WI)

    2012-07-17

    An interior permanent magnet electric machine is disclosed. The interior permanent magnet electric machine comprises a rotor comprising a plurality of radially placed magnets each having a proximal end and a distal end, wherein each magnet comprises a plurality of magnetic segments and at least one magnetic segment towards the distal end comprises a high resistivity magnetic material.

  19. Stock Assessment of Columbia River Anadromous Salmonids : Final Report, Volume I, Chinook, Coho, Chum and Sockeye Salmon Summaries.

    SciTech Connect (OSTI)

    Howell, Philip J.

    1986-07-01

    The purpose was to identify and characterize the wild and hatchery stocks of salmon and steelhead in the Columbia River Basin on the basis of currently available information. This report provides a comprehensive compilation of data on the status and life histories of Columbia Basin salmonid stocks.

  20. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    SciTech Connect (OSTI)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  1. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    SciTech Connect (OSTI)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  2. District of Columbia Natural Gas Consumption by End Use

    Gasoline and Diesel Fuel Update (EIA)

    984 1,037 1,072 1,740 2,437 2,907 2001-2015 Residential 242 240 253 520 911 1,335 1989-2015 Commercial 657 711 736 1,135 1,443 1,487 1989-2015 Industrial 0 0 0 0 0 0 2001-2015 Vehicle Fuel 86 86 83 86 83 86 2010-2015 Electric Power -- -- -- -- -- --

  3. Microsoft PowerPoint - 2015-06-18 Corps Columbia Riverkeeper Settlement SWPA Mtg.ppt [Read-Only] [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRESENTATION TITLE Wayne Todd Sr. Hydropower Program Manager Northwestern Division Corps of Engineers Agreement with Columbia Riverkeeper Regarding Hydropower Plant Discharges 2015 Southwestern Federal Hydropower Meeting June 18, 2015 BUILDING STRONG ® Who is Columbia Riverkeeper? 2 From their official website: Columbia Riverkeeper is the leading public-interest group working to protect the Columbia.... While we utilize sophisticated scientific, legal, and policy tools to protect the river, we

  4. Electrical connector

    DOE Patents [OSTI]

    Dilliner, Jennifer L.; Baker, Thomas M.; Akasam, Sivaprasad; Hoff, Brian D.

    2006-11-21

    An electrical connector includes a female component having one or more receptacles, a first test receptacle, and a second test receptacle. The electrical connector also includes a male component having one or more terminals configured to engage the one or more receptacles, a first test pin configured to engage the first test receptacle, and a second test pin configured to engage the second test receptacle. The first test receptacle is electrically connected to the second test receptacle, and at least one of the first test pin and the second test pin is shorter in length than the one or more terminals.

  5. LNG scene; Qatar's export plans intensify; sale of Columbia's U. S. terminal in doubt

    SciTech Connect (OSTI)

    Not Available

    1992-07-20

    This paper reports that Activity continues to percolate in Qatar's massive liquefied natural gas export program. In the latest development, France's Ste. Nationale Elf Aquitaine and Japan's Sumitomo Corp. agreed to promote development of Qatar's LNG export project based on supergiant North Offshore gas field and step up discussions with potential buyers in coming months. Target markets lie in Japan and the Far East. Among other LNG operations, Columbia Gas System Inc. last week the it was told by Shell LNG Co. it is unlikely that presale conditions will be met prior to Shell LNG's scheduled purchase July 29 of 40.8% of the stock in Columbia LNG. Columbia LNG owns and LNG receiving terminal at Cove Point, Md., with a design sendout capacity of 1 bcfd of regasified LNG. That makes it the biggest in type U.S. Columbia the it had not received work on what action Shell LNG will take on the purchase agreement. However, failure to meet the undisclosed conditions will allow Shell LNG to end the agreement.

  6. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of the Northern Mid-Columbia Joint Project, a 230-kilvolt transmission line proposed by BPA and the Public Utility Districts of Grant, Chelan, and Douglas Counties, Washington.

  7. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    SciTech Connect (OSTI)

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  8. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    SciTech Connect (OSTI)

    Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

    2012-05-01

    This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

  9. Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.

    SciTech Connect (OSTI)

    Hillson, Todd D.

    2009-06-12

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production

  10. Electric generator

    DOE Patents [OSTI]

    Foster, Jr., John S. (Pleasanton, CA); Wilson, James R. (Livermore, CA); McDonald, Jr., Charles A. (Danville, CA)

    1983-01-01

    1. In an electrical energy generator, the combination comprising a first elongated annular electrical current conductor having at least one bare surface extending longitudinally and facing radially inwards therein, a second elongated annular electrical current conductor disposed coaxially within said first conductor and having an outer bare surface area extending longitudinally and facing said bare surface of said first conductor, the contiguous coaxial areas of said first and second conductors defining an inductive element, means for applying an electrical current to at least one of said conductors for generating a magnetic field encompassing said inductive element, and explosive charge means disposed concentrically with respect to said conductors including at least the area of said inductive element, said explosive charge means including means disposed to initiate an explosive wave front in said explosive advancing longitudinally along said inductive element, said wave front being effective to progressively deform at least one of said conductors to bring said bare surfaces thereof into electrically conductive contact to progressively reduce the inductance of the inductive element defined by said conductors and transferring explosive energy to said magnetic field effective to generate an electrical potential between undeformed portions of said conductors ahead of said explosive wave front.

  11. District of Columbia Natural Gas Consumption by End Use

    U.S. Energy Information Administration (EIA) Indexed Site

    33,251 32,862 28,561 32,743 34,057 1997-2014 Pipeline & Distribution Use 213 1,703 1,068 1,434 1,305 1997-2014 Volumes Delivered to Consumers 33,038 31,159 27,493 31,309 32,751 29,157 1997-2015 Residential 13,608 12,386 11,260 13,214 14,242 12,371 1980-2015 Commercial 18,547 16,892 15,363 17,234 17,498 15,793 1980-2015 Industrial 0 0 0 0 0 0 1997-2015 Vehicle Fuel 883 879 870 861 1,011 993 1988-2015 Electric Power -- 1,003 W -- -- --

  12. Optimization of ferrous burden high temperature properties to meet blast furnace requirements in British Steel

    SciTech Connect (OSTI)

    Bergstrand, R.

    1996-12-31

    The high temperature properties of ferrous burden materials have long been an important consideration in the operation of British Steel blast furnaces. Previous research presented at this conference has shown that the behavior of materials in the lower stack and bosh can have a significant effect on furnace permeability and stability of operation. However, with increasing levels of hydrocarbon injection via the tuyeres, the reduction conditions inside British Steel blast furnaces have significantly altered over recent years. This paper focuses on the further work that has been undertaken to study the effect on ferrous burden high temperatures properties of the widely differing reduction regimes which can be experienced in today`s blast furnaces. The implications of the findings, and how they have been used in optimizing blast furnace operation and burden quality, are discussed.

  13. EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

  14. PP-230-1 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 International Transmission Company PP-230-1 International Transmission Company Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-230-1 International Transmission Company More Documents & Publications PP-230-2 International Transmission Company PP-230 International Transmission Company PP-221 Detroit Edison Company

  15. Microsoft PowerPoint - spp_presentation.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SPP Presentation 2 Southwestern Regional Hydropower Conference Kansas City, Missouri June 7-8, 2006 Ron Ciesiel Director of Compliance Southwest Power Pool 3 Organization Registration Generation Owners and Generation Operators 4 United States Federal Energy Regulatory Commission Mexico Comision Reguladora de Energia Canada NEB, Alberta, British Columbia, Manitoba, Ontario, New Brunswick, Nova Scotia, Quebec, and Saskatchewan Electric Reliability Organization Overview Electric Reliability

  16. Electrically powered hand tool

    DOE Patents [OSTI]

    Myers, Kurt S.; Reed, Teddy R.

    2007-01-16

    An electrically powered hand tool is described and which includes a three phase electrical motor having a plurality of poles; an electrical motor drive electrically coupled with the three phase electrical motor; and a source of electrical power which is converted to greater than about 208 volts three-phase and which is electrically coupled with the electrical motor drive.

  17. O:\EA-171.ORD

    Energy Savers [EERE]

    BRITISH COLUMBIA POWER EXCHANGE CORPORATION Order No. EA-171 I. BACKGROUND Exports of electric energy from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On December 23, 1997, British Columbia Power Exchange Corporation (Powerex) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. Powerex

  18. Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

  19. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  20. SUPPLEMENTAL COLUMBIA RIVER PROTECTION ACTIVITIES AT THE DEPARTMENT OF ENERGY HANFORD SITE: 2006 TECHNICAL PEER REVIEW

    SciTech Connect (OSTI)

    Looney, B; Dawn Kaback; Gene Leboeuf; Jason Mulvihill-Kuntz; Lynn Lefkoff

    2006-12-20

    Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these additional proposals provided conditional support. For those proposals that received conditional support, DOE requested specific implementation and work plans and assessed whether the plans adequately addressed the technical conditions identified by the review panel. The final list of technology proposals receiving support, or conditional support, primarily focused on understanding and reducing the potential impacts of uranium, chromium, and strontium from facilities adjacent to the Columbia River, with a secondary focus on understanding and limiting the future Columbia River impacts from the large carbon tetrachloride groundwater plume underlying and downgradient of the Hanford Central Plateau facilities. The results and recommendations of the peer reviews informed the final DOE project selections and supported implementation of the selected projects to protect the Columbia River and address groundwater contamination at Hanford.

  1. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2012

    SciTech Connect (OSTI)

    Johnson, Gary E.; Sather, Nichole K.; Storch, Adam; Johnson, Jeff; Skalski, J. R.; Teel, D. J.; Brewer, Taylor; Bryson, Amanda J.; Dawley, Earl M.; Kuligowski, D. R.; Whitesel, T.; Mallette, Christine

    2013-11-30

    The study reported herein was conducted for the U.S. Army Corps of Engineers, Portland District (USACE) by researchers at the Pacific Northwest National Laboratory (PNNL), Oregon Department of Fish and Wildlife (ODFW), National Marine Fisheries Service (NMFS), University of Washington (UW), and U.S. Fish and Wildlife Service (USFWS). The goal of the study was to evaluate the ecological benefits of restoration actions for juvenile salmon in the lower Columbia River and estuary (LCRE; rkm 0234).

  2. Letter from the Department of Energy to the District of Columbia Public

    Energy Savers [EERE]

    Service Commission with respect to the Emergency Petition and Complaint | Department of Energy with respect to the Emergency Petition and Complaint Letter from the Department of Energy to the District of Columbia Public Service Commission with respect to the Emergency Petition and Complaint Docket No. EO-05-01: We have received the Petition and Complaint that you filed with the Department of Energy (DOE) and the Federal Energy Regulatory Commission (FERC) on August 24, 2005, on behalf of the

  3. Catherine Naud (Columbia Univ.) and Anthony Del Genio (GISS), New York

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    thermodynamic phase distribution in midlatitude optically thin clouds Catherine Naud (Columbia Univ.) and Anthony Del Genio (GISS), New York Martial Haeffelin, Yohann Morille and Vincent Noel (IPSL/LMD, France) Dave Turner (Univ. Wisconsin, Madison), Zhien Wang (Univ. Wyoming, Laramie) Chaomei Lo and Jennifer Comstock (PNNL) 5. Ice fraction vs temperature: similar relation at all cloud levels 2. Thermodynamic phase from lidar: determined at all lidar cloud levels from depolarization ratios and

  4. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS : Appendices.

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described. The document concludes with an evaluation of the potential effects that could result from implementing proposed actions. The conclusions are based on evaluation of existing data, utilization of numerical models, and application of logical inference. This volume contains the appendices.

  5. Information retrieval system: impacts of water-level changes on uses of federal storage reservoirs of the Columbia River.

    SciTech Connect (OSTI)

    Fickeisen, D.H.; Cowley, P.J.; Neitzel, D.A.; Simmons, M.A.

    1982-09-01

    A project undertaken to provide the Bonneville Power Administration (BPA) with information needed to conduct environmental assessments and meet requirements of the National Environmental Policy Act (NEPA) and the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act) is described. Access to information on environmental effects would help BPA fulfill its responsibilities to coordinate power generation on the Columbia River system, protect uses of the river system (e.g., irrigation, recreation, navigation), and enhance fish and wildlife production. Staff members at BPA identified the need to compile and index information resources that would help answer environmental impact questions. A computer retrieval system that would provide ready access to the information was envisioned. This project was supported by BPA to provide an initial step toward a compilation of environmental impact information. Scientists at Pacific Northwest Laboratory (PNL) identified, gathered, and evaluated information related to environmental effects of water level on uses of five study reservoirs and developed and implemented and environmental data retrieval system, which provides for automated storage and retrieval of annotated citations to published and unpublished information. The data retrieval system is operating on BPA's computer facility and includes the reservoir water-level environmental data. This project was divided into several tasks, some of which were conducted simultaneously to meet project deadlines. The tasks were to identify uses of the five study reservoirs, compile and evaluate reservoir information, develop a data entry and retrieval system, identify and analyze research needs, and document the data retrieval system and train users. Additional details of the project are described in several appendixes.

  6. Total Dissolved Gas Effects on Fishes of the Lower Columbia River

    SciTech Connect (OSTI)

    McGrath, Kathy E.; Dawley, Earl; Geist, David R.

    2006-03-31

    Gas supersaturation problems generated by spill from dams on the Columbia River were first identified in the 1960s. Since that time, considerable research has been conducted on effects of gas supersaturation on aquatic life, primarily juvenile salmonids. Also since that time, modifications to dam structures and operations have reduced supersaturated gas levels produced by the dams. The limit for total dissolved gas saturation (TDGS) as mandated by current Environmental Protection Agency water quality standards is 110%. State management agencies issue limited waivers to water quality, allowing production of levels of up to 120% TDGS to facilitate the downstream migration of juvenile salmonids. Recently, gas supersaturation as a water quality issue has resurfaced as concerns have grown regarding chronic effects of spill-related total dissolved gas on salmonids, including incubating embryos and larvae, resident fish species, and other aquatic organisms. Because of current concerns, and because the last comprehensive review of research on supersaturation effects on fishes was conducted in 1997, we reviewed recent supersaturation literature to identify new or ongoing issues that may not be adequately addressed by the current 110% TDGS limit and the 120% TDGS water quality waiver. We found that recent work supports older research indicating that short-term exposure to levels up to 120% TDGS does not produce acute effects on migratory juvenile or adult salmonids when compensating depths are available. Monitoring programs at Snake and Columbia river dams from 1995 to the early 2000s documented a low incidence of significant gas bubble disease or mortality in Columbia River salmonids, resident fishes, or other taxa. We did, however, identify five areas of concern in which total dissolved gas levels lower than water quality limits may produce sublethal effects on fishes of the Columbia River. These areas of concern are 1) sensitive and vulnerable species or life stages, 2) long-term chronic or multiple exposure, 3) vulnerable habitats and reaches, 4) effects on incubating fish in hyporheic habitats, and 5) community and ecosystem effects. Although some of these areas of concern may have been identified previously in earlier works, we suggest that consideration of the issues is warranted to avoid detrimental impacts on aquatic resources of the Columbia River system. We discuss these issues and provide recommendations to regulatory and management agencies based on our review of recent literature. In general, we recommend that additional attention be directed toward resolving the uncertainties within these five areas.

  7. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Methodology and Documentation General The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics,...

  8. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Information and Staff The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S....

  9. Electrical receptacle

    DOE Patents [OSTI]

    Leong, R.

    1993-06-22

    The invention is a receptacle for a three prong electrical plug which has either a tubular or U-shaped grounding prong. The inventive receptacle has a grounding prong socket which is sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having two ridges to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket. The two ridges are made to prevent the socket from expanding when either the U-shaped grounding prong or the tubular grounding prong is inserted.

  10. Electrical Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOT MEASUREMENT SENSITIVE DOE HANDBOOK ELECTRICAL SAFETY DOE-HDBK-1092-2013 July 2013 Superseding DOE-HDBK-1092-2004 December 2004 U.S. Department of Energy AREA SAFT Washington, D.C.20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1092-2013 Available on the Department of Energy Technical Standards Program Web site at http://www.hss.doe.gov/nuclearsafety/techstds/ ii DOE-HDBK-1092-2013 FOREWORD 1. This Department of Energy (DOE) Handbook is

  11. Electrical Safety

    Office of Environmental Management (EM)

    NOT MEASUREMENT SENSITIVE DOE HANDBOOK ELECTRICAL SAFETY DOE-HDBK-1092-2013 July 2013 Superseding DOE-HDBK-1092-2004 December 2004 U.S. Department of Energy AREA SAFT Washington, D.C.20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1092-2013 Available on the Department of Energy Technical Standards Program Web site at http://www.hss.doe.gov/nuclearsafety/techstds/ ii DOE-HDBK-1092-2013 FOREWORD 1. This Department of Energy (DOE) Handbook is

  12. Biofuels from Bacteria, Electricity, and CO2: Biofuels from CO2 Using Ammonia or Iron-Oxidizing Bacteria in Reverse Microbial Fuel Cells

    SciTech Connect (OSTI)

    2010-07-01

    Electrofuels Project: Electrofuels Project: Columbia University is using carbon dioxide (CO2) from ambient air, ammoniaan abundant and affordable chemical, and a bacteria called N. europaea to produce liquid fuel. The Columbia University team is feeding the ammonia and CO2 into an engineered tank where the bacteria live. The bacteria capture the energy from ammonia and then use that energy to convert CO2 into a liquid fuel. When the bacteria use up all the ammonia, renewable electricity can regenerate it and pump it back into the systemcreating a continuous fuel-creation cycle. In addition, Columbia University is also working with the bacteria A. ferrooxidans to capture and use energy from ferrous iron to produce liquid fuels from CO2.

  13. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2001 Annual Report.

    SciTech Connect (OSTI)

    DeHart, Michele

    2002-07-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion measures resulted in very poor in-river migration conditions in 2001. Up to 99% of Snake River yearling chinook and steelhead were transported from the Snake River collection projects. Approximately 96% of Snake River juvenile sub-yearling fall chinook were transported. Of Mid-Columbia origin yearling chinook, 35% were transported, of steelhead 30% were transported and of sub yearling chinook, 59% were transported. Based upon data collected on the run-at-large, the juvenile survival to Lower Granite Dam of wild and hatchery yearling chinook and wild and hatchery steelhead were the lowest observed in the last four years. In 2001, as the result of the lowest observed flows in recent years, travel times through the hydro system for spring chinook yearlings and steelhead was approximately twice as long as has been observed historically. Juvenile survival estimates through each index reach of the hydro system for steelhead and chinook juveniles was the lowest observed since the use of PIT tag technology began for estimating survival.

  14. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    SciTech Connect (OSTI)

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  15. NEPA analysis of US-Canadian power transactions under the Columbia River Treaty

    SciTech Connect (OSTI)

    Pierce, K.S.; Weintraub, N.H.; Linehan, A.O.

    1995-12-01

    The Columbia River Treaty of 1961 led to the development of three hydroelectric projects on the Columbia River in Canada and one in the United States. Canada sold its share of the downstream power generation benefits of these facilities to US utilities for 30 years. The administrator of the Bonneville Power Administration (BPA) of the US Department of Energy is the {open_quotes}United States Entity{close_quotes} under the Columbia River Treaty with Canada. BPA prepared the {open_quotes}Delivery of the Canadian Entitlement{close_quotes} Environmental Impact Statement (EIS) to evaluate alternative means for the US to return to Canada the Canadian share of the downstream benefits when these 30-year agreements expire. Alternatives on both sides of the US-Canada border included new high-voltage transmission lines; new generating and conservation resources; and power sales, exchanges, and other transactions. BPA developed an EIS methodology and graphical representation technique for comparing the diverse options associated with the Delivery of the Canadian Entitlement that were instrumental in helping managers understand the impacts of alternatives in a timely manner. A graphical, modular approach helped convey complex relationships in ways that were easy to read and understand. In addition, analysis of potential environmental impacts in Canada was developed in order to provide relevant information to US decision-makers, without compromising the Canadian environmental review process. As a result, environmental analysis was fully integrated into the decision process. The EIS approach used in this project has become a prototype for other Department of Energy NEPA documents, both site-specific and programmatic.

  16. Gas bubble disease in smallmouth bass and northern squawfish from the Snake and Columbia Rivers

    SciTech Connect (OSTI)

    Montgomery, J.C.; Becker, C.D.

    1980-11-01

    In 1975 and 1976, 179 smallmouth bass (Micropterus dolomieui) and 85 northern squawfish (Ptychocheilus oregonensis) were collected by angling from the lower Snake and mid-Columbia rivers, southeastern Washington. All fish were examined externally for gas bubble syndrome. Emboli were found beneath membranes of the opercula, body, and fins of 72% of the smallmouth bass and 84% of the northern squawfish. Hemorrhage was also noted on the caudal, anal, and pectoral fins of several smallmouth bass. Presence of gas bubble syndrome corresponded to the spring runoff when total dissolved gas supersaturations in river water exceeded 115%.

  17. The Oncor Geodatabase for the Columbia Estuary Ecosystem Restoration Program: Annual Report, 2012

    SciTech Connect (OSTI)

    Coleman, Andre M.; Johnson, Gary E.; Borde, Amy B.; Diefenderfer, Heida L.; Sather, Nichole K.; Seiple, Timothy E.; Serkowski, John A.

    2013-11-10

    Pacific Northwest National Laboratory (PNNL) conducted this project for the U.S. Army Corps of Engineers, Portland District (Corps). The purpose of the project is to develop a geospatial, web-accessible database (called Oncor) for action effectiveness and related data from monitoring and research efforts for the Columbia Estuary Ecosystem Restoration Program (CEERP). The intent is for the Oncor database to enable synthesis and evaluation, the results of which can then be applied in subsequent CEERP decision-making. This is the first annual report in what is expected to be a 3- to 4-year project, which commenced on February 14, 2012.

  18. Literature and data review for the surface-water pathway: Columbia River and adjacent coastal areas

    SciTech Connect (OSTI)

    Walters, W.H.; Dirkes, R.L.; Napier, B.A.

    1992-04-01

    As part of the Hanford Environmental Dose Reconstruction Project, Pacific Northwest Laboratory reviewed literature and data on radionuclide concentrations and distribution in the water, sediment, and biota of the Columbia River and adjacent coastal areas. Over 600 documents were reviewed including Hanford reports, reports by offsite agencies, journal articles, and graduate theses. Certain radionuclide concentration data were used in preliminary estimates of individual dose for the 1964--1966 time period. This report summarizes the literature and database review and the results of the preliminary dose estimates.

  19. Lower Columbia River Salmon Business Plan for Terminal Fisheries : Final Report.

    SciTech Connect (OSTI)

    Salmon For All

    1996-07-01

    Salmon fishing in the Northwest requires a public-private partnership. The public through its decision-makers, agencies, and laws states it will do all that is necessary to protect and preserve the valuable salmon resource. Yet, the public side of the partnership is broken. The Columbia River salmon fishing industry, with over 140 years of documented history, is at a crossroads. This report explores a variety of issues, concerns, and ideas related to terminal fishery development. In some cases recommendations are made. In addition, options are explored with an understanding that those designated as decision-makers must make decisions following considerable discussion and reflection.

  20. Technical Appendix for Development for Modified Streamflows 1928-1989 : Columbia River & Coastal Basin.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; A.G. Crook Company

    1993-06-01

    The report ``Adjusted Streamflow and Storage 1928-1989`` contains listings of historical flows for the sites in the Columbia River and Coastal Basins. This section of the Technical Appendix provides for the site specific procedures used to determine those historical flows. The study purpose, authority, and definitions are given in the main report. The purpose of this section of the Technical Appendix is to document the computational procedures used at each of the project sites to develop historical flows for the period July 1928--September 1989.

  1. Status Report of the Pacific Lamprey (Lampetra Trzdentata) in the Columbia River Basin.

    SciTech Connect (OSTI)

    Close, David A.; Parker, Blaine; James, gary

    1995-07-01

    The widespread decline of Pacific lamprey (Lampetra tridentata) in the Pacific Northwest, especially in the Columbia River system has led to concerns and questions from a number of regional agencies, Native American tribes, and the public. To address these concerns, new research efforts must focus on specific problems associated with this understudied species. The preservation and restoration of this species is critical for a number of reasons, including its importance to the tribes and its importance as an indicator of ecosystem health. Historically lamprey have been labeled a pest species due to the problems associated with the exotic sea lamprey, (Petromyzon marinus), invading the Great Lakes.

  2. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  3. The Committee met in the Columbia Room at the Holiday Inn

    U.S. Energy Information Administration (EIA) Indexed Site

    Friday, April 21, 1995 - - - The Committee met in the Columbia Room at the Holiday Inn Capitol, 550 C Street S.W., Washington, D.C., at 9:00 a.m., Timothy D. Mount, Chairman, presiding. PRESENT: TIMOTHY D. MOUNT, Chair DAVID R. BELLHOUSE CHARLES W. BISCHOFF BRENDA G. COX FAYE DUCHIN JOHN D. GRACE PHILIP HANSWER CALVIN KENT GRETA M. LJUNG JAMES L. O'BRIEN DANIEL A. RELLES BRADLEY O. SKARPNESS G. CAMPBELL WATKINS A-G-E-N-D-A Page No. Introductory Remarks, TIMOTHY MOUNT, Chairman 3 Announcement of

  4. District of Columbia Price of Natural Gas Delivered to Commercial Sectors

    U.S. Energy Information Administration (EIA) Indexed Site

    by Marketers (Dollars per Thousand Cubic Feet) Marketers (Dollars per Thousand Cubic Feet) District of Columbia Price of Natural Gas Delivered to Commercial Sectors by Marketers (Dollars per Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 14.26 2010's 12.12 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 2/29/2016 Next Release Date: 3/31/2016

  5. O:ELECTRICEA-98-F.PDF

    Energy Savers [EERE]

    FE Docket No. EA-98-F Arizona Public Service Company MIECO, Inc. Aquila Power Corporation Montana Power Company Avista Energy, Inc. PP&L, Inc. British Columbia Power Exchange Corp. Pacific Gas & Electric Company Central Louisiana Electric Company Pacific Northwest Generating Cooperative Citizens Power Sales PacifiCorp CNG Power Service Corporation PanCanadian Energy Services, Inc. Destec Power Services, Inc PECO Energy Company El Paso Electric Company Philbro Inc. Electric

  6. Spawning and abundance of fall chinook salmon (Oncorhynchus tshawytscha) in the Hanford Reach of the Columbia River, 1948--1988

    SciTech Connect (OSTI)

    Dauble, D.D.; Watson, D.G.

    1990-03-01

    The Hanford Reach of the Columbia River provides the only major spawning habitat for the upriver bright (URB) race of fall chinook salmon in the mainstem Columbia River. Hanford Site biologists have conducted aerial surveys of spawning salmon in the Hanford Reach since 1948. This report summarizes data on fall chinook salmon spawning in the Hanford Reach and presents a discussion of factors that may affect population trends. Most data are limited to fisheries agency reports and other working documents. Fisheries management practices in the Columbia River system have changed rapidly over the last decade, particularly under requirements of the Pacific Northwest Power Planning and Conservation Act of 1980. New information has been generated and included in this report. 75 refs., 17 figs., 11 tabs.

  7. Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

    2011-05-10

    The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

  8. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009

    SciTech Connect (OSTI)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

    2010-10-26

    This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

  9. Shrub-Steppe Seasons A Natural History of the Mid-Columbia Basin

    SciTech Connect (OSTI)

    LE Rogers

    1995-08-01

    This book collects and updates a series of articles about the natural history of the Mid-Columbia region. The articles first appeared as a monthly column titled ''Natural History'' in the Tri-City Herald, beginning in May 1991. My approach has been to condense the best of what is known about the ecology of the region to a manageable length with little in the way of technical language and terms. Admittedly, there is a bias toward those topics and species on which I have either been personally involved or observed as part of the ecology research programs conducted on the Fitzner/Eberhardt Arid Lands Ecology (ALE) Reserve. The ALE Reserve is situated on the northeast-facing flank of the Rattlesnake Hills. Rattlesnake Mountain with a crest of over 3,600 feet is visible throughout much of the Mid-Columbia. Shrub-steppe grasslands once covered a large part of the western United States but most have been converted to other uses. The ALE site is the only remaining sizeable acreage (120 square miles) that is in near pristine condition and provides the only clear indication as to what the early trappers, traders, pioneers, and tribal members may have encountered in their day-to-day activities. In this respect, ALE provides a visible touchstone linking the past with the present for all of us.

  10. Lower Columbia River and Estuary Habitat Monitoring Study, 2011 - Final Report

    SciTech Connect (OSTI)

    Borde, Amy B.; Kaufmann, Ronald M.; Cullinan, Valerie I.; Zimmerman, Shon A.; Thom, Ronald M.; Wright, Cynthia L.

    2012-03-22

    The Ecosystem Monitoring Program is a collaborative effort between the Lower Columbia River Estuary Partnership (LCREP), University of Washington, Wetland Ecosystem Team (UW), US Geological Survey, Water Science Center (USGS), National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA-Fisheries, hereafter NOAA), and Pacific Northwest National Laboratory, Marine Sciences Laboratory (PNNL). The goal of the program is to conduct emergent wetland monitoring aimed at characterizing salmonid habitats in the lower Columbia River and estuary (LCRE) from the mouth of the estuary to Bonneville Dam (Figure 1). This is an ecosystem based monitoring program focused on evaluating status and trends in habitat and reducing uncertainties regarding these ecosystems to ultimately improve the survival of juvenile salmonids through the LCRE. This project comprehensively assesses habitat, fish, food web, and abiotic conditions in the lower river, focusing on shallow water and vegetated habitats used by juvenile salmonids for feeding, rearing and refugia. The information is intended to be used to guide management actions associated with species recovery, particularly that of threatened and endangered salmonids. PNNLs role in this multi-year study is to monitor the habitat structure (e.g., vegetation, topography, channel morphology, and sediment type) as well as hydrologic patterns.

  11. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat County

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  12. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    1997-04-01

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

  13. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    SciTech Connect (OSTI)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  14. Simulating coarse-scale vegetation dynamics using the Columbia River Basin succession model-crbsum. Forest Service general technical report

    SciTech Connect (OSTI)

    Keane, R.E.; Long, D.G.; Menakis, J.P.; Hann, W.J.; Bevins, C.D.

    1996-10-01

    The paper details the landscape succession model developed for the coarse-scale assessment called CRBSUM (Columbia River Basin SUccession Model) and presents some general results of the application of this model to the entire basin. CRBSUM was used to predict future landscape characteristics to evaluate management alternatives for both mid-and coarse-scale efforts. A test and sensitivity analysis of CRBSUM is also presented. This paper was written as a users guide for those who wish to run the model and interprete results, and its was also written as documentation for some results of the Interior Columbia River Basin simulation effort.

  15. Field Summary Report for Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington, Collection of Surface Water, River Sediments, and Island Soils

    SciTech Connect (OSTI)

    L. C. Hulstrom

    2009-09-28

    This report has been prepared in support of the remedial investigation of Hanford Site Releases to the Columbia River and describes the 2008/2009 data collection efforts. This report documents field activities associated with collection of sediment, river water, and soil in and adjacent to the Columbia River near the Hanford Site and in nearby tributaries.

  16. Electric and Hybrid Electric Vehicle Sales: December 2010 - June 2013 |

    Office of Environmental Management (EM)

    Department of Energy Electric and Hybrid Electric Vehicle Sales: December 2010 - June 2013 Electric and Hybrid Electric Vehicle Sales: December 2010 - June 2013 Sales data for various models of electric and hybrid electric vehicles from December 2010 through June 2013. File Electric and Hybrid Electric Vehicle Sales: December 2010 - June 2013 (Excel) File Electric and Hybrid Electric Vehicle Sales: December 2010 - June 2013 (CSV) Image icon Chart of Electric and Hybrid Electric Vehicle

  17. MSR Innovations Modular Solar Roofing | Open Energy Information

    Open Energy Info (EERE)

    search Name: MSR Innovations (Modular Solar Roofing) Place: Burnaby, British Columbia, Canada Zip: V5J 5H8 Product: British Columbia-based PV roofing systems maker. Coordinates:...

  18. EPOD Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    Inc Jump to: navigation, search Name: EPOD Solar Inc Place: Kelowna, British Columbia, Canada Zip: V1V 2L9 Sector: Solar Product: British Columbia-based thin-film a-Si PV maker as...

  19. TOXCO Incorporated | Open Energy Information

    Open Energy Info (EERE)

    Place: British Columbia, Canada Zip: V1R 4L5 Product: British Columbia-based, lithium battery recycling firm. References: TOXCO Incorporated1 This article is a stub. You...

  20. Technology Roadmap - Electric and Plug-in Hybrid Electric Vehicles...

    Open Energy Info (EERE)

    Roadmap - Electric and Plug-in Hybrid Electric Vehicles Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Technology Roadmap - Electric and Plug-in Hybrid Electric...

  1. Electrical Generation for More-Electric Aircraft using Solid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells This study, completed by...

  2. Electrical safety guidelines

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Electrical Safety Guidelines prescribes the DOE safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety standards and guidance for DOE installations in order to affect a reduction or elimination of risks associated with the use of electrical energy. The objectives of these guidelines are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

  3. DOE handbook electrical safety

    SciTech Connect (OSTI)

    1998-01-01

    Electrical Safety Handbook presents the Department of Energy (DOE) safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety guidance and information for DOE installations to effect a reduction or elimination of risks associated with the use of electrical energy. The objectives of this handbook are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

  4. Steelhead Spawning Surveys Near Locke Island, Hanford Reach of the Columbia River

    SciTech Connect (OSTI)

    DR Geist; RP Mueller

    1999-10-19

    In 1997, the National Marine Fisheries Service (NMFS) listed upper Columbia River steelhead trout (Oncorhynchus znykiss) as endangered. This action affected management of land-use activities along and within the Hanford Reach of the Columbia River, which flows through the U.S. Department of Energy (DOE) Hanford Site. Steelhead covered in this listing include all naturally spawned populations of steel-head and their progeny in streams in the Columbia River Basin upstream from the Yakima River to the United States/Canada border. The NMFS has identified a general listing of activities that could potentially result in harm to steelhead (62 FR 43937, August 18, 1997). One of these concerns includes land-use changes resulting in mass wasting or surface erosion. Landslide activity along the White Bluffs on the east ,side of Locke Island has redirected river flow into the island where substantial erosion has occurred. This erosion has exposed important anthropological and archaeological resources that were previously buried on the island. The DOE is working with affected tribes and other agencies to develop a plan for addressing the erosion of Locke Island. As part of this effort, the U.S. Army Corps of Engineers has prepared an assessment of potential alternatives to stabilize the erosion, including a no-action alternative. Steelhead historically spawned in the vicinity of Locke Island, but recent information on the occurrence of steelhead spawning or availability of spawning habitat was lacking. Therefore, the purpose of this study was to determine if steelhead spawned in the vicinity of Locke Island erosion and to evaluate the composition of substrate in the affected area. Surveys to document the occurrence of steelheads redds were conducted in Spring 1999. The surveys were conducted from the air as well as with the use of an underwater video camera. Neither aerial nor underwater surveys documented steelhead spawning within the survey area. Habitat surveys were conducted in July 1999. The survey area was divided into an area adjacent to the erosion zone and an area immediately upstream of this zone. The majority of the survey area was composed of gravel and medium cobble (particle sizes 0.6 to 15.2 cm). Aquatic vegetation (milfoil) was found in the upstream section, indicating lower water velocities not conducive to steelhead spawning. Based on the available substrate within the entire survey area, we estimate 81% of survey site could be used by adult steelhead for spawning.

  5. Edison Electric Institute Update

    Broader source: Energy.gov [DOE]

    Presentationgiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the Edison Electric Institute (EEI) and the current electricity landscape.

  6. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Electric Power Sector comprises electricity-only and combined heat and power (CHP) plants within the North American Industrial Classification System 22 category whose...

  7. DOE Electricity Advisory Committee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Advisory Committee March 2015 1 MEMORANDUM TO: Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of ...

  8. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See all Electricity Reports Electricity Monthly Update With Data for November 2014 | Release Date: Jan. 26, 2015 | Next Release Date: Feb. 24, 2015 Previous Issues Issue:...

  9. Electricity Monthly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Update November 28, 2012 Map of Electric System Selected for Daily Peak Demand was replaced with the correct map showing Selected Wholesale Electricity and Natural Gas Locations....

  10. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of electricity. End-use data is the first "data page" based on the assumption that information about retail electricity service is of greatest interest to a general...

  11. Annual Power Electric

    U.S. Energy Information Administration (EIA) Indexed Site

    Noncoincident Peak Load by North American Electric Reliability Corporation Assessment Area, Actual Table 8.6.B. Noncoincident Peak Load by North American Electric Reliability ...

  12. Integrating Electricity Subsector

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrating Electricity Subsector Failure Scenarios into a Risk Assessment Methodology ... Executive, Cyber Security Electric Power Research Institute (EPRI) For more information on ...

  13. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Nevada Electricity Profile 2013 Table 1. 2013 Summary statistics (Nevada) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 10,652 34 Electric...

  14. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Minnesota Electricity Profile 2013 Table 1. 2013 Summary statistics (Minnesota) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 15,758 26 Electric...

  15. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    York Electricity Profile 2013 Table 1. 2013 Summary statistics (New York) Item Value Rank Primary energy source Natural Gas Net summer capacity (megawatts) 39,918 6 Electric...

  16. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Vermont Electricity Profile 2013 Table 1. 2013 Summary statistics (Vermont) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 1,255 50 Electric...

  17. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Hampshire Electricity Profile 2013 Table 1. 2013 Summary statistics (New Hampshire) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 4,413 44 Electric...

  18. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Montana Electricity Profile 2013 Table 1. 2013 Summary statistics (Montana) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 6,329 41 Electric utilities...

  19. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Virginia Electricity Profile 2013 Table 1. 2013 Summary statistics (Virginia) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 24,828 16 Electric...

  20. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Missouri Electricity Profile 2013 Table 1. 2013 Summary statistics (Missouri) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 21,801 19 Electric...

  1. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Texas Electricity Profile 2013 Table 1. 2013 Summary statistics (Texas) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 109,584 1 Electric...

  2. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Wisconsin Electricity Profile 2013 Table 1. 2013 Summary statistics (Wisconsin) Item Value Rank Primary Energy Source Coal Net summer capacity (megawatts) 17,342 23 Electric...

  3. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Michigan Electricity Profile 2013 Table 1. 2013 Summary statistics (Michigan) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 30,128 11 Electric...

  4. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Jersey Electricity Profile 2013 Table 1. 2013 Summary statistics (New Jersey) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 18,997 22 Electric...

  5. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Pennsylvania Electricity Profile 2013 Table 1. 2013 Summary statistics (Pennsylvania) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 43,040 5 Electric...

  6. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Nebraska Electricity Profile 2013 Table 1. 2013 Summary statistics (Nebraska) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 8,449 36 Electric utilities...

  7. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Alaska Electricity Profile 2013 Table 1. 2013 Summary statistics (Alaska) Item Value Rank Primary energy source Natural Gas Net summer capacity (megawatts) 2,384 48 Electric...

  8. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Oklahoma Electricity Profile 2013 Table 1. 2013 Summary statistics (Oklahoma) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 23,300 17 Electric...

  9. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Dakota Electricity Profile 2013 Table 1. 2013 Summary statistics (North Dakota) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 6,566 40 Electric...

  10. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Maryland Electricity Profile 2013 Table 1. 2013 Summary statistics (Maryland) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 12,339 33 Electric...

  11. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Carolina Electricity Profile 2013 Table 1. 2013 Summary statistics (South Carolina) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 23,017 18 Electric...

  12. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Tennessee Electricity Profile 2013 Table 1. 2013 Summary statistics (Tennessee) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 21,326 20 Electric...

  13. Electricity | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sources Electricity Electricity March 17, 2016 Dr. Imre Gyuk -- pictured speaking at a Green Mountain Power energy storage event -- was recently recognized for his game-changing ...

  14. Field Summary Report for Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington

    SciTech Connect (OSTI)

    L.C. Hulstrom

    2010-08-11

    This report summarizes field sampling activities conducted in support of WCHs Remedial Investigation of Hanford Site Releases to the Columbia River. This work was conducted form 2008 through 2010. The work included preliminary mapping and measurement of Hanford Site contaminants in sediment, pore water, and surface water located in areas where groundwater upwelling were found.

  15. Survey of Artificial Production of Anadromous Salmonids in the Columbia River Basin, 1981-1985 Final Report.

    SciTech Connect (OSTI)

    Washington, Percy M.

    1985-11-25

    The overall objective of this project is to collect, organize, and summarize data concerning anadromous fish culture stations of the Columbia River system for 1981, 1982, and 1983 and to create a data archive system with a means of making this information available to the public.

  16. EIS-0170-SA-01: Supplement Analysis

    Broader source: Energy.gov [DOE]

    System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada

  17. Numerical study of the Columbia high-beta device: Torus-II

    SciTech Connect (OSTI)

    Izzo, R.

    1981-01-01

    The ionization, heating and subsequent long-time-scale behavior of the helium plasma in the Columbia fusion device, Torus-II, is studied. The purpose of this work is to perform numerical simulations while maintaining a high level of interaction with experimentalists. The device is operated as a toroidal z-pinch to prepare the gas for heating. This ionization of helium is studied using a zero-dimensional, two-fluid code. It is essentially an energy balance calculation that follows the development of the various charge states of the helium and any impurities (primarily silicon and oxygen) that are present. The code is an atomic physics model of Torus-II. In addition to ionization, we include three-body and radiative recombination processes.

  18. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

    SciTech Connect (OSTI)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Dawley, Earl M.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Russell, Micah; Skalski, John R.; Thom, Ronald M.; Vavrinec, John

    2008-10-01

    The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

  19. Population Estimates for Chum Salmon Spawning in the Mainstem Columbia River, 2002 Technical Report.

    SciTech Connect (OSTI)

    Rawding, Dan; Hillson, Todd D.

    2003-11-15

    Accurate and precise population estimates of chum salmon (Oncorhynchus keta) spawning in the mainstem Columbia River are needed to provide a basis for informed water allocation decisions, to determine the status of chum salmon listed under the Endangered Species Act, and to evaluate the contribution of the Duncan Creek re-introduction program to mainstem spawners. Currently, mark-recapture experiments using the Jolly-Seber model provide the only framework for this type of estimation. In 2002, a study was initiated to estimate mainstem Columbia River chum salmon populations using seining data collected while capturing broodstock as part of the Duncan Creek re-introduction. The five assumptions of the Jolly-Seber model were examined using hypothesis testing within a statistical framework, including goodness of fit tests and secondary experiments. We used POPAN 6, an integrated computer system for the analysis of capture-recapture data, to obtain maximum likelihood estimates of standard model parameters, derived estimates, and their precision. A more parsimonious final model was selected using Akaike Information Criteria. Final chum salmon escapement estimates and (standard error) from seining data for the Ives Island, Multnomah, and I-205 sites are 3,179 (150), 1,269 (216), and 3,468 (180), respectively. The Ives Island estimate is likely lower than the total escapement because only the largest two of four spawning sites were sampled. The accuracy and precision of these estimates would improve if seining was conducted twice per week instead of weekly, and by incorporating carcass recoveries into the analysis. Population estimates derived from seining mark-recapture data were compared to those obtained using the current mainstem Columbia River salmon escapement methodologies. The Jolly-Seber population estimate from carcass tagging in the Ives Island area was 4,232 adults with a standard error of 79. This population estimate appears reasonable and precise but batch marks and lack of secondary studies made it difficult to test Jolly-Seber assumptions, necessary for unbiased estimates. We recommend that individual tags be applied to carcasses to provide a statistical basis for goodness of fit tests and ultimately model selection. Secondary or double marks should be applied to assess tag loss and male and female chum salmon carcasses should be enumerated separately. Carcass tagging population estimates at the two other sites were biased low due to limited sampling. The Area-Under-the-Curve escapement estimates at all three sites were 36% to 76% of Jolly-Seber estimates. Area-Under-the Curve estimates are likely biased low because previous assumptions that observer efficiency is 100% and residence time is 10 days proved incorrect. If managers continue to rely on Area-Under-the-Curve to estimate mainstem Columbia River spawners, a methodology is provided to develop annual estimates of observer efficiency and residence time, and to incorporate uncertainty into the Area-Under-the-Curve escapement estimate.

  20. District of Columbia Natural Gas Delivered to Commercial Consumers for the

    Gasoline and Diesel Fuel Update (EIA)

    Account of Others (Million Cubic Feet) Delivered to Commercial Consumers for the Account of Others (Million Cubic Feet) District of Columbia Natural Gas Delivered to Commercial Consumers for the Account of Others (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 0 0 0 1990's 0 417 155 332 1,343 3,954 4,823 8,122 8,045 9,644 2000's 11,420 12,848 14,028 11,879 13,327 13,893 13,695 15,703 15,110 15,550 2010's 15,507 14,029 12,614 13,942

  1. District of Columbia Heat Content of Natural Gas Deliveries to Consumers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (BTU per Cubic Foot) Heat Content of Natural Gas Deliveries to Consumers (BTU per Cubic Foot) District of Columbia Heat Content of Natural Gas Deliveries to Consumers (BTU per Cubic Foot) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2013 1,030 1,025 1,021 1,014 1,014 1,025 1,034 1,037 1,043 1,041 1,047 1,048 2014 1,041 1,035 1,031 1,038 1,035 1,038 1,038 1,038 1,039 1,041 1,044 1,043 2015 1,045 1,047 1,046 1,044 1,044 1,040 1,037 1,036 1,035 1,045 1,039 1,044 - = No Data Reported; --

  2. District of Columbia Natural Gas Number of Commercial Consumers (Number of

    U.S. Energy Information Administration (EIA) Indexed Site

    Elements) Commercial Consumers (Number of Elements) District of Columbia Natural Gas Number of Commercial Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 11 14,683 11,370 11,354 1990's 11,322 11,318 11,206 11,133 11,132 11,089 10,952 10,874 10,658 12,108 2000's 11,106 10,816 10,870 10,565 10,406 10,381 10,410 9,915 10,024 10,288 2010's 9,879 10,050 9,771 9,963 10,049 - = No Data Reported; -- = Not Applicable; NA = Not

  3. District of Columbia Natural Gas Number of Residential Consumers (Number of

    U.S. Energy Information Administration (EIA) Indexed Site

    Elements) Residential Consumers (Number of Elements) District of Columbia Natural Gas Number of Residential Consumers (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1980's 134 130,748 134,758 134,837 1990's 136,183 136,629 136,438 135,986 135,119 135,299 135,215 134,807 132,867 137,206 2000's 138,252 138,412 143,874 136,258 138,134 141,012 141,953 142,384 142,819 143,436 2010's 144,151 145,524 145,938 146,712 147,877 - = No Data Reported; --

  4. District of Columbia Natural Gas Vehicle Fuel Price (Dollars per Thousand

    U.S. Energy Information Administration (EIA) Indexed Site

    Cubic Feet) Vehicle Fuel Price (Dollars per Thousand Cubic Feet) District of Columbia Natural Gas Vehicle Fuel Price (Dollars per Thousand Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 2.06 4.94 3.01 2.60 2.80 2000's 3.99 5.14 4.37 5.95 6.76 8.93 9.50 9.49 15.57 6.83 2010's 4.87 4.17 9.38 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 2/29/2016 Next

  5. Water Quality Sampling Locations Along the Shoreline of the Columbia River, Hanford Site, Washington

    SciTech Connect (OSTI)

    Peterson, Robert E.; Patton, Gregory W.

    2009-12-14

    As environmental monitoring evolved on the Hanford Site, several different conventions were used to name or describe location information for various sampling sites along the Hanford Reach of the Columbia River. These methods range from handwritten descriptions in field notebooks to the use of modern electronic surveying equipment, such as Global Positioning System receivers. These diverse methods resulted in inconsistent archiving of analytical results in various electronic databases and published reports because of multiple names being used for the same site and inaccurate position data. This document provides listings of sampling sites that are associated with groundwater and river water sampling. The report identifies names and locations for sites associated with sampling: (a) near-river groundwater using aquifer sampling tubes; (b) riverbank springs and springs areas; (c) pore water collected from riverbed sediment; and (d) Columbia River water. Included in the listings are historical names used for a particular site and the best available geographic coordinates for the site, as of 2009. In an effort to create more consistency in the descriptive names used for water quality sampling sites, a naming convention is proposed in this document. The convention assumes that a unique identifier is assigned to each site that is monitored and that this identifier serves electronic database management requirements. The descriptive name is assigned for the convenience of the subsequent data user. As the historical database is used more intensively, this document may be revised as a consequence of discovering potential errors and also because of a need to gain consensus on the proposed naming convention for some water quality monitoring sites.

  6. O:ELECTRICORDERSea-98-g.PDF

    Energy Savers [EERE]

    FE Docket No. EA-98-G Arizona Public Service Company MIECO, Inc. Aquila Power Corporation Montana Power Company Avista Energy, Inc. PP&L, Inc. British Columbia Power Exchange Corp. Pacific Gas & Electric Company Candela Energy Corporation Pacific Northwest Generating Cooperative Central Louisiana Electric Company PacifiCorp Citizens Power Sales PanCanadian Energy Services, Inc CNG Power Service Corporation . PECO Energy Company Destec Power Services, Inc Philbro Inc. El Paso Electric

  7. CASL - Westinghouse Electric Company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Electric Company Cranberry Township, PA Westinghouse Electric Company provides fuel, services, technology, plant design and equipment for the commercial nuclear electric power industry. Westinghouse nuclear technology is helping to provide future generations with safe, clean and reliable electricity. Key Contributions Definition of CASL challenge problems Existing codes and expertise Data for validation Computatinoal fluid dynamics modeling and analysis Development of test stand for

  8. Lesson 2- Electricity Basics

    Broader source: Energy.gov [DOE]

    It’s difficult to imagine life without convenient electricity. You just flip a switch or plug in an appliance, and it’s there. But how did it get there? Many steps go into providing the reliable electricity we take for granted. This lesson takes a closer look at electricity. It follows the path of electricity from the fuel source to the home, including the power plant and the electric power grid. It also covers the role of electric utilities in the generation, transmission, and distribution of electricity.

  9. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Methodology and Documentation General The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. Energy Information Administration (EIA), U.S. Department of Energy. Data published in the Electricity Monthly Update are compiled from the following sources: U.S. Energy Information Administration, Form EIA-826,"Monthly Electric Utility Sales and Revenues with State Distributions Report," U.S. Energy

  10. Electricity Transmission, A Primer

    Office of Environmental Management (EM)

    Transmission A Primer National Council on Electricity Policy National Council on Electricity Policy i Electricity Transmission A Primer By Matthew H. Brown, National Conference of State Legislatures Richard P. Sedano, The Regulatory Assistance Project National Council on Electric Policy The National Council on Electricity Policy is a joint venture among the National Conference of State Legislatures (NCSL), the National Association of Regulatory Utility Commissioners (NARUC) and the National

  11. Baltimore Gas & Electric Company (Electric) - Residential Energy...

    Broader source: Energy.gov (indexed) [DOE]

    AC: 30 Recycling RefrigeratorFreezer: 50 ACDehumidifier: 25 Summary The Baltimore Gas & Electric Company (BGE) offers rebates for residential customers to improve the...

  12. Table 4. Electric power industry capability by primary energy source, 1990 through 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    District of Columbia" "megawatts" "Item", 2013, 2012, 2011, 2010, 2009, 2008, 2007, 2006, 2005, 2004, 2003, 2002, 2001, 2000, 1999, 1998, 1997, 1996, 1995, 1994, 1993, 1992, 1991, 1990,"Percent share 2000","Percent share 2010","Percent share 2013" "Electric utilities",0,0,0,0,0,0,0,0,0,0,0,0,0,0,806,806,806,806,806,806,806,806,806,806,0,0,0

  13. Table 5. Electric power industry generation by primary energy source, 1990 through 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    District of Columbia" "megawatthours" "Item", 2013, 2012, 2011, 2010, 2009, 2008, 2007, 2006, 2005, 2004, 2003, 2002, 2001, 2000, 1999, 1998, 1997, 1996, 1995, 1994, 1993, 1992, 1991, 1990,"Percent Share 2000","Percent Share 2010","Percent Share 2013" "Electric utilities",0,0,71199,0,0,0,0,0,0,0,0,0,0,97423,230003,243975,70661,109809,188862,274252,188452,73991,179814,361043,67.5,0,0 "Natural

  14. Hydrodynamic Simulation of the Columbia River, Hanford Reach, 1940--2004

    SciTech Connect (OSTI)

    Waichler, Scott R.; Perkins, William A.; Richmond, Marshall C.

    2005-06-15

    Many hydrological and biological problems in the Columbia River corridor through the Hanford Site require estimates of river stage (water surface elevation) or river flow and velocity. Systematic collection of river stage data at locations in the Hanford Reach began in 1991, but many environmental projects need river stage information at unmeasured locations or over longer time periods. The Modular Aquatic Simulation System 1D (MASS1), a one-dimensional, unsteady hydrodynamic and water quality model, was used to simulate the Columbia River from Priest Rapids Dam to McNary Dam from 1940 to 2004, providing estimates of water surface elevation, volumetric flow rate, and flow velocity at 161 locations on the Hanford Reach. The primary input data were bathymetric/topographic cross sections of the Columbia River channel, flow rates at Priest Rapids Dam, and stage at McNary Dam. Other inputs included Yakima River and Snake River inflows. Available flow data at a gaging station just below Priest Rapids Dam was mean daily flow from 1940 to 1986 and hourly thereafter. McNary dam was completed in 1957, and hourly stage data are available beginning in 1975. MASS1 was run at an hourly timestep and calibrated and tested using 1991--2004 river stage data from six Hanford Reach locations (areas 100B, 100N, 100D, 100H, 100F, and 300). Manning's roughness coefficient in the Reach above each river recorder location was adjusted using an automated genetic algorithm and gradient search technique in three separate calibrations, corresponding to different data subsets, with minimization of mean absolute error as the objective. The primary calibration was based on 1999, a representative year, and included all locations. The first alternative calibration also used all locations but was limited in time to a high-flow period during spring and early summer of 1997. The second alternative calibration was based on 1999 and included only 300 Area stage data. Model goodness-of-fit for all years with data was high in the primary calibration and indicated little bias caused by selecting 1999. The alternative calibrations led to improved goodness-of-fit for their limited time and locations, but degraded goodness-of-fit overall. Overall, the simulations were very accurate and even highlighted some probable data problems, as evidenced by systematic shifts in the data. Further improvements in simulating the historic period would depend on correcting these inferred data problems. For all years and locations, the mean absolute error in the primary calibration was 14.8 cm, the mean error was 1 mm, and model efficiency was 0.988. The MASS1 output for 1940--2004 can be used to reconstruct historical river elevations at Hanford or to build scenarios of future river elevations for solving environmental problems such as groundwater-river interaction or fish habitat inventories. Model output and additional processing services are available from the authors. Longer-term scenarios extending more than a few decades from now should also consider the impacts of climate change and reservoir operation change. Once defined, these impacts could be used to drive new simulations with MASS1.

  15. Electric arc saw apparatus

    DOE Patents [OSTI]

    Deichelbohrer, Paul R [Richland, WA

    1986-01-01

    A portable, hand held electric arc saw has a small frame for supporting an electrically conducting rotary blade which serves as an electrode for generating an electric arc to erode a workpiece. Electric current is supplied to the blade by biased brushes and a slip ring which are mounted in the frame. A pair of freely movable endless belts in the form of crawler treads stretched between two pulleys are used to facilitate movement of the electric arc saw. The pulleys are formed of dielectric material to electrically insulate the crawler treads from the frame.

  16. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.

    SciTech Connect (OSTI)

    DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret

    2003-09-01

    The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated that Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater than observed in the past ten years averaged together. In 2002, about 87 million juvenile salmon were released from Federal, State, Tribal or private hatcheries into the Columbia River Basin above Bonneville Dam. This represents an increase over the past season, when only 71 million juvenile fish were released into the same area.

  17. Population Structure of Columbia River Basin Chinook Salmon and Steelhead Trout, Technical Report 2001.

    SciTech Connect (OSTI)

    Brannon, E.L.; National Science Foundation

    2002-08-01

    The population structure of chinook salmon and steelhead trout is presented as an assimilation of the life history forms that have evolved in synchrony with diverse and complex environments over their Pacific range. As poikilotherms, temperature is described as the overwhelming environmental influence that determines what life history options occur and where they are distributed. The different populations represent ecological types referred to as spring-, summer-, fall, and winter-run segments, as well as stream- and ocean-type, or stream- and ocean-maturing life history forms. However, they are more correctly described as a continuum of forms that fall along a temporal cline related to incubation and rearing temperatures that determine spawn timing and juvenile residence patterns. Once new habitats are colonized, members of the founding populations spread through adaptive evolution to assume complementary life history strategies. The related population units are collectively referred to as a metapopulation, and members most closely associated within common temporal and geographic boundaries are designated as first-order metapopulations. Population structure of chinook salmon and steelhead in the Columbia Basin, therefore, is the reflection of the genetic composition of the founding source or sources within the respective region, shaped by the environment, principally temperature, that defines life history evolutionary strategy to maximize fitness under the conditions delineated. The complexity of structure rests with the diversity of opportunities over the elevations that exist within the Basin. Consistent with natural selection, rather than simply attempting to preserve populations, the challenge is to provide opportunities to expand their range to new or restored habitat that can accommodate genetic adaptation as directional environmental changes are elaborated. Artificial propagation can have a critical role in this process, and the emphasis must be placed on promoting the ability for anadromous salmonids to respond to change by assuring that the genetic diversity to facilitate such responses is present. The key in developing an effective recovery program for chinook salmon and steelhead is to recognize that multiple life history forms associated with temperature characterize the species in the Columbia Basin, and recovery measures taken must address the biological requirements of the population unit within the environmental template identified. Unless such measures are given first and highest priority, establishment of biologically self-sustaining populations will be restrained.

  18. Evaluation of Life History Diversity, Habitat Connectivity, and Survival Benefits Associated with Habitat Restoration Actions in the Lower Columbia River and Estuary, Annual Report 2009

    SciTech Connect (OSTI)

    Diefenderfer, Heida L.; Johnson, Gary E.; Sather, Nichole K.; Skalski, John R.; Dawley, Earl M.; Coleman, Andre M.

    2010-08-01

    This report describes the 2009 research conducted under the U.S. Army Corps of Engineers (USACE or Corps) project EST-09-P-01, titled Evaluation of Life History Diversity, Habitat Connectivity, and Survival Benefits Associated with Habitat Restoration Actions in the Lower Columbia River and Estuary. The research was conducted by the Pacific Northwest National Laboratory, Marine Science Laboratory and Hydrology Group, in partnership with the University of Washington, School of Aquatic and Fishery Sciences, Columbia Basin Research, and Earl Dawley (NOAA Fisheries, retired). This Columbia River Fish Mitigation Program project, referred to as Salmonid Benefits, was started in FY 2009 to evaluate the state-of-the science regarding the ability to quantify the benefits to listed salmonids1 of habitat restoration actions in the lower Columbia River and estuary.

  19. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    SciTech Connect (OSTI)

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  20. Establishing the SECME model in the District of Columbia. Quarterly report, 1 January 1994--31 March 1994

    SciTech Connect (OSTI)

    Vikers, R.G.

    1994-05-01

    During this quarter, many program activities were held to help SECME teachers and counselors implement, improve and strengthen SECME school programs in the District of Columbia. Teachers were actively engaged in enhanced instructional techniques, ideas, processes and resources to help them enrich their students` learning experience. Students are busily participating in hands-on instructional activities and preparing for the SECME competition where they are learning to excel in a competitive environment designed to help them make the most of their school experience.

  1. Electric Efficiency Standard

    Broader source: Energy.gov [DOE]

    In December 2009, the Indiana Utility Regulatory Commission's (IURC) ordered utilities to establish demand-side management (DSM) electric savings goals leading to 2.0% reduction of electricity sa...

  2. Electricity Monthly Update

    Gasoline and Diesel Fuel Update (EIA)

    cheap price of natural gas reduced coals share of electricity production. Days of Burn Days of burn Coal capacity The average number of days of burn held at electric power...

  3. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2012-10-01

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  4. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2013-04-01

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  5. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Hand, M. M.

    2012-09-01

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  6. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2012-11-01

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

  7. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    End Use: August 2015 Retail ratesprices and consumption In this section, we look at what electricity costs and how much is purchased. Charges for retail electric service are based...

  8. Electricity Monthly Update

    Gasoline and Diesel Fuel Update (EIA)

    sales volumes are presented as a proxy for end-use electricity consumption. Average Revenue per kWh by state Percent Change Per KWh map showing U.S. electric industry percent...

  9. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Georgia Electricity Profile 2013 Table 1. 2013 Summary statistics (Georgia) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 38,210 7 Electric...

  10. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Arizona Electricity Profile 2013 Table 1. 2013 Summary statistics (Arizona) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 27,910 13 Electric...

  11. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Maine Electricity Profile 2013 Table 1. 2013 Summary statistics (Maine) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 4,499 43 Electric...

  12. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Utah Electricity Profile 2013 Table 1. 2013 Summary statistics (Utah) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 7,698 39 Electric utilities 6,669...

  13. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Hawaii Electricity Profile 2013 Table 1. 2013 Summary statistics (Hawaii) Item Value U.S. Rank Primary energy source Petroleum Net summer capacity (megawatts) 2,757 47 Electric...

  14. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Kentucky Electricity Profile 2013 Table 1. 2013 Summary statistics (Kentucky) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 21,004 21 Electric...

  15. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Indiana Electricity Profile 2013 Table 1. 2013 Summary statistics (Indiana) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 27,196 14 Electric...

  16. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Electricity Profile 2013 Table 1. 2013 Summary statistics (Colorado) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 14,769 30 Electric...

  17. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Ohio Electricity Profile 2013 Table 1. 2013 Summary statistics (Ohio) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 32,482 8 Electric utilities 20,779...

  18. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Iowa Electricity Profile 2013 Table 1. 2013 Summary statistics (Iowa) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 15,929 25 Electric utilities...

  19. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Illinois Electricity Profile 2013 Table 1. 2013 Summary statistics (Illinois) Item Value U.S. Rank Primary energy source Nuclear Net summer capacity (megawatts) 44,950 4 Electric...

  20. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Mexico Electricity Profile 2013 Table 1. 2013 Summary statistics (New Mexico) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 7,938 38 Electric...

  1. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Kansas Electricity Profile 2013 Table 1. 2013 Summary statistics (Kansas) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 14,093 32 Electric...

  2. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Florida Electricity Profile 2013 Table 1. 2013 Summary statistics (Florida) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 58,781 3 Electric...

  3. Estimating the Value of Electricity Storage Resources in Electricity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    research and development for electricity storage technologies and applications. PDF icon EAC - Estimating the Value of Electricity Storage Resources in Electricity Markets Oct ...

  4. Panasonic Electric Works Ltd formerly Matsushita Electric Works...

    Open Energy Info (EERE)

    Electric Works Ltd (formerly Matsushita Electric Works) Place: Kadoma-shi, Osaka, Japan Zip: 571-8686 Product: Japanese manufacturer of mainly electric appliances including...

  5. Table 2a. Electricity Consumption and Electricity Intensities...

    U.S. Energy Information Administration (EIA) Indexed Site

    Administration Home Page Home > Commercial Buildings Home > Sq Ft Tables > Table 2a. Electricity Consumption per Sq Ft Table 2a. Electricity Consumption and Electricity...

  6. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    SciTech Connect (OSTI)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  7. Columbia River White Sturgeon Genetics and Early Life History: Population Segregation and Juvenile Feeding Behavior, 1987 Final Report.

    SciTech Connect (OSTI)

    Brannon, Ernest L.

    1988-06-01

    The geographic area of the genetics study broadly covered the distribution range of sturgeon in the Columbia from below Bonneville Dam at Ilwaco at Lake Roosevelt, the Upper Snake River, and the Kootenai River. The two remote river sections provided data important for enhancement considerations. There was little electrophoretic variation seen among individuals from the Kootenai River. Upper Snake river sturgeon showed a higher percentage of polymorphic loci than the Kootenai fish, but lower than the other areas in the Columbia River we sampled. Sample size was increased in both Lake Roosevelt and at Electrophoretic variation was specific to an individual sampling area in several cases and this shaped our conclusions. The 1987 early life history studies concentrated on the feeding behavior of juvenile sturgeon. The chemostimulant components in prey attractive to sturgeon were examined, and the sensory systems utilized by foraging sturgeon were determined under different environmental conditions. These results were discussed with regard to the environmental changes that have occurred in the Columbia River. Under present river conditions, the feeding mechanism of sturgeon is more restricted to certain prey types, and their feeding range may be limited. In these situations, enhancement measures cannot be undertaken without consideration given to the introduction of food resources that will be readily available under present conditions. 89 refs., 7 figs., 11 tabs.

  8. Florida's electric industry and solar electric technologies

    SciTech Connect (OSTI)

    Camejo, N.

    1983-12-01

    The Florida Electric Industry is in a process of diversifying its generation technology and its fuel mix. This is being done in an effort to reduce oil consumption, which in 1981 accounted for 46.5% of the electric generation by fuel type. This does not compare well with the rest of the nation where oil use is lower. New coal and nuclear units are coming on line, and probably more will be built in the near future. However, eventhough conservation efforts may delay their construction, new power plants will have to be built to accomodate the growing demand for electricity. Other alternatives being considered are renewable energy resources. The purpose of this paper is to present the results of a research project in which 10 electric utilities in Florida and the Florida Electric Power Coordinating Group rated six Solar Electric options. The Solar Electric options considered are: 1) Wind, 2) P.V., 3) Solar thermal-electric, 4) OTEC, 5) Ocean current, and 6) Biomass. The questionaire involved rating the economic and technical feasibility, as well as, the potential environmental impact of these options in Florida. It also involved rating the difficulty in overcoming institutional barriers and assessing the status of each option. A copy of the questionaire is included after the references. The combined capacity of the participating utilities represent over 90% of the total generating capacity in Florida. A list of the participating utilities is also included. This research was done in partial fulfillment for the Mater's of Science Degree in Coastal Zone Management. This paper is complementary to another paper (in these condensed conference proceedings) titled COASTAL ZONE ENERGY MANAGEMENT: A multidisciplinary approach for the integration of Solar Electric Systems with Florida's power generation system, which present a summary of the Master's thesis.

  9. Electric arc saw apparatus

    DOE Patents [OSTI]

    Deichelbohrer, P.R.

    1983-08-08

    A portable, hand-held electric arc saw apparatus comprising a small frame for supporting an electrically conducting rotary blade which serves as an electrode for generating an electric arc between the blade and a workpiece of opposite polarity. Electrically conducting means are provided on said frame for transmitting current to said blade. A pair of freely movable endless belts in the form of crawler treads are employed to facilitate movement of the apparatus relative to the workpiece.

  10. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    End Use: December 2015 Retail rates/prices and consumption In this section, we look at what electricity costs and how much is purchased. Charges for retail electric service are based primarily on rates approved by state regulators. However, a number of states have allowed retail marketers to compete to serve customers and these competitive retail suppliers offer electricity at a market-based price. EIA does not directly collect retail electricity rates or prices. However, using data collected on

  11. EIA Electric Power Forms

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EIA Electric Power Forms EIA Electric Power Forms Listing of Publicly Available and Confidential Data EIA's statistical surveys encompass each significant electric supply and demand activity in the United States. Most of the electric power survey forms resulting data elements are published, but respondent confidentiality is required. The chart below shows the data elements for each survey form and how each data element is treated in regard to confidentiality. Data Categories Data collection

  12. Electrical utilities relay settings

    SciTech Connect (OSTI)

    HACHE, J.M.

    1999-02-24

    This document contains the Hanford transmission and distribution system relay settings that are under the control of Electrical Utilities.

  13. Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA

    SciTech Connect (OSTI)

    Johnson, Gary E.; Khan, Fenton; Skalski, J. R.; Klatte, Bernard A.

    2013-11-20

    Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

  14. Solar space heating for the visitors' center, Stephens College, Columbia, Missouri. Final report

    SciTech Connect (OSTI)

    Henley, Marion

    1980-06-01

    This document is the final report of the solar energy system located at the Visitors' Center on the Stephens College Campus, Columbia, Missouri. The system is installed in a four-story, 15,000 square foot building designed to include the college's Admission Office, nine guest rooms for overnight lodging for official guests of the college, a two-story art gallery, and a Faculty Lounge. The solar energy system is an integral design of the building and utilizes 176 Honeywell/Lennox hydronic flat-plate collectors which use a 50% water-ethylene glycol solution and water-to-water heat exchanger. Solar heated water is stored in a 5000 gallon water storage tank located in the basement equipment room. A natural gas fired hot water boiler supplies hot water when the solar energy heat supply fails to meet the demand. The designed solar contribution is 71% of the heating load. The demonstration period for this project ends June 30, 1984.

  15. Columbia River Coordinated Information System (CIS); Information Needs, 1992 Technical Report.

    SciTech Connect (OSTI)

    Petrosky, Charlie; Kinney, William J.; Rowe, Mike

    1993-05-01

    Successful application of adaptive management to rebuilding the Columbia Basin`s anadromous fish resources requires that available information and experience be organized and shared between numerous organizations and individuals. Much of this knowledge exists only in unpublished form in agency and individual files. Even that information which is published in the form of technical and contract reports receives only limited distribution and is often out of print and unavailable after a few years. Only a small fraction of the basin`s collective knowledge is captured in permanent and readily available databases and recognized journals. State, tribal, and federal fishery managers have recognize these information management problems and have committed to a program, the Coordinated Information System Project, to capture and share more easily the core data and other information upon which management decisions are based. That project is now completing the process of scoping and identification of information needs. Construction of prototype systems will begin in 1992. This report is one in a series of seven describing the results of the Coordinated Information on System scoping and needs identification phase.

  16. Effects of Total Dissolved Gas on Chum Salmon Fry Incubating in the Lower Columbia River

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Hand, Kristine D.; Geist, David R.; Murray, Katherine J.; Panther, Jenny; Cullinan, Valerie I.; Dawley, Earl M.; Elston, Ralph A.

    2008-01-30

    This report describes research conducted by Pacific Northwest National Laboratory in FY 2007 for the U.S. Army Corps of Engineers, Portland District, to characterize the effects of total dissolved gas (TDG) on the incubating fry of chum salmon (Onchorhynchus keta) in the lower Columbia River. The tasks conducted and results obtained in pursuit of three objectives are summarized: * to conduct a field monitoring program at the Ives Island and Multnomah Falls study sites, collecting empirical data on TDG to obtain a more thorough understanding of TDG levels during different river stage scenarios (i.e., high-water year versus low-water year) * to conduct laboratory toxicity tests on hatchery chum salmon fry at gas levels likely to occur downstream from Bonneville Dam * to sample chum salmon sac fry during Bonneville Dam spill operations to determine if there is a physiological response to TDG levels. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the study methdology and results are provided in Appendixes A through D.

  17. Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia

    SciTech Connect (OSTI)

    Pasha, MD Fayzul K; Hadjerioua, Boualem; Stewart, Kevin M; Bender, Merlynn; Schneider, Michael L.

    2012-01-01

    The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

  18. Stock Summary Reports for Columbia River Anadromous Salmonids, Volume V; Idaho Subbasins, 1992 CIS Summary Report.

    SciTech Connect (OSTI)

    Keifer, Sharon; Rowe, Mike; Hatch, Keith

    1993-05-01

    An essential component of the effort to rebuild the Columbia Basin's anadromous fish resources is that available information and experience be organized and shared among numerous organizations and individuals. Past experience and knowledge must form the basis for actions into the future. Much of this knowledge exists only in unpublished form in agency and individual files. Even that information which is published in the form of technical and contract reports receives only limited distribution and is often out of print and unavailable after a few years. Only a small fraction of the basin's collective knowledge is captured in permanent and readily available databases (such as the Northwest Environmental Database) or in recognized journals. State, tribal, and federal fishery managers have recognized these information management problems and have committed to a program, the Coordinated Information System Project, to capture and share more easily the core data and other information upon which management decisions are based. That project has completed scoping and identification of key information needs and development of a project plan. Work performed under the CIS project will be coordinated with and extend information contained in the Northwest Environmental Database. Construction of prototype systems will begin in Phase 3. This report is one in a series of seven describing the results of the Coordinated Information System scoping and needs identification phase. A brief description of each of these reports is given.

  19. Sluiceway Operations for Adult Steelhead Downstream Passage at The Dalles Dam, Columbia River, USA

    SciTech Connect (OSTI)

    Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Tackley, Sean C.

    2013-10-01

    This study evaluated adult steelhead (Oncorhynchus mykiss; fallbacks and kelts) downstream passage at The Dalles Dam in the Columbia River, USA, during the late fall, winter, and early spring months between 2008 and 2011. The purpose of the study was to determine the efficacy of operating the dam’s ice-and-trash sluiceway during non-spill months to provide a relatively safe, non-turbine, surface outlet for overwintering steelhead fallbacks and downstream migrating steelhead kelts. We applied the fixed-location hydroacoustic technique to estimate fish passage rates at the sluiceway and turbines of the dam. The spillway was closed during our sampling periods, which generally occurred in late fall, winter, and early spring. The sluiceway was highly used by adult steelhead (91–99% of total fish sampled passing the dam) during all sampling periods. Turbine passage was low when the sluiceway was not operated. This implies that lack of a sluiceway route did not result in increased turbine passage. However, when the sluiceway was open, adult steelhead used it to pass through the dam. The sluiceway may be operated during late fall, winter, and early spring to provide an optimal, non-turbine route for adult steelhead (fallbacks and kelts) downstream passage at The Dalles Dam.

  20. District of Columbia Price of Natural Gas Sold to Commercial Consumers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Dollars per Thousand Cubic Feet) Sold to Commercial Consumers (Dollars per Thousand Cubic Feet) District of Columbia Price of Natural Gas Sold to Commercial Consumers (Dollars per Thousand Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1989 5.55 5.47 5.74 5.11 4.95 4.64 4.95 4.58 5.08 5.05 5.19 5.61 1990 6.14 5.83 6.62 5.50 5.18 5.30 5.21 4.88 4.64 4.90 5.15 5.56 1991 5.59 5.58 4.91 5.56 4.78 4.47 4.66 4.47 5.06 5.08 5.21 5.15 1992 5.37 5.55 5.24 5.18 5.18 4.89 4.85 4.76

  1. Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program

    SciTech Connect (OSTI)

    Johnson, Gary E.; Diefenderfer, Heida L.; Ebberts, Blaine D.; Tortorici, Cathy; Yerxa, Tracey; Leary, J.; Skalski, John R.

    2008-02-05

    The purpose ofthis document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision-making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows. 1. Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. 2. Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. 3. Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. 4. Maintain the food web to benefit salmonid performance. 5. Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. In conclusion, the estuary RME effort is designed to meet the research and monitoring needs of the estuary Program using an adaptive management process. Estuary RME's success and usefulness will depend on the actual conduct of adaptive management, as embodied in the objectives, implrementation, data, reporting, and synthesis, evaluation, and decision-making described herein.

  2. Use of Aerial Photography to Monitor Fall Chinook Salmon Spawning in the Columbia River

    SciTech Connect (OSTI)

    Visser, Richard H.; Dauble, Dennis D.); Geist, David R.)

    2002-11-01

    This paper compares two methods for enumerating salmon redds and their application to monitoring spawning activity. Aerial photographs of fall chinook salmon spawning areas in the Hanford Reach of the Columbia River were digitized and mapped using Geographic Information Systems (GIS) techniques in 1994 and 1995 as part of an annual assessment of the population. The number of visible redds from these photographs were compared to counts obtained from visual surveys with fixed wing aircraft. The proportion of the total redds within each of five general survey areas was similar for the two monitoring techniques. However, the total number of redds based on aerial photographs was 2.2 and 3.0 times higher than those observed during visual surveys for 1994 and 1995, respectively. The divergence in redd counts was most evident near peak spawning activity when the number of redds within individual spawning clusters exceeded 500. Aerial photography improved our ability to monitor numbers of visible salmon redds and to quantify habitat use.

  3. Acoustic Telemetry Studies of Juvenile Chinook Salmon Survival at the Lower Columbia Projects in 2006

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, Richard L.; Skalski, John R.; McComas, Roy L.

    2008-02-01

    The Portland District of the U.S. Army Corps of Engineers contracted with the Pacific Northwest National Laboratory (PNNL) to conduct three studies using acoustic telemetry to estimate detection probabilities and survival of juvenile Chinook salmon at three hydropower projects on the lower Columbia River. The primary goals were to estimate detection and survival probabilities based on sampling with JSATS equipment, assess the feasibility of using JSATS for survival studies, and estimate sample sizes needed to obtain a desired level of precision in future studies. The 2006 JSATS arrays usually performed as well or better than radio telemetry arrays in the JDA and TDA tailwaters, and underperformed radio arrays in the BON tailwater, particularly in spring. Most of the probabilities of detection on at least one of all arrays in a tailwater exceeded 80% for each method, which was sufficient to provide confidence in survival estimates. The probability of detection on one of three arrays includes survival and detection probabilities because fish may die or pass all three arrays undetected but alive.

  4. Integrating Electricity Subsector

    Office of Environmental Management (EM)

    Integrating Electricity Subsector Failure Scenarios into a Risk Assessment Methodology 3002001181 | DEC 2013 Program Leads Jason D. Christopher Technical Lead, Cyber Security Capabilities & Risk Management Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability (OE) Annabelle Lee Senior Technical Executive, Cyber Security Electric Power Research Institute (EPRI) For more information on the DOE's cyber security risk management programs, please contact

  5. DOE Electricity Advisory Committee

    Office of Environmental Management (EM)

    Electricity Advisory Committee March 2015 1 MEMORANDUM TO: Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy FROM: Electricity Advisory Committee (EAC) Richard Cowart, Chair DATE: March 27, 2015 RE: Recommendations on Smart Grid Research and Development Needs _________________________________________________________________________ Overview The Smart Grid is envisioned to provide the enhancements to ensure higher levels of

  6. EWEB- Solar Electric Program (Rebate)

    Broader source: Energy.gov [DOE]

    The Eugene Water & Electric Board's (EWEB) Solar Electric Program offers financial incentives for residential, nonprofit, and government customers that generate electricity solar photovoltaic...

  7. Lincoln Electric | Open Energy Information

    Open Energy Info (EERE)

    Electric Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Lincoln Electric Developer Lincoln Electric Energy Purchaser Lincoln...

  8. Epcot Electric | Open Energy Information

    Open Energy Info (EERE)

    Epcot Electric Jump to: navigation, search Name: Epcot Electric Place: Texas Facebook: https:www.facebook.compagesEpcot-Electric108882552477023 References: EIA Form EIA-861...

  9. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2008.

    SciTech Connect (OSTI)

    Faulkner, James R.; Smith, Steven G.; Muir, William D.

    2009-06-23

    In 2008, the National Marine Fisheries Service completed the sixteenth year of a study to estimate survival and travel time of juvenile salmonids Oncorhynchus spp. passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from detections of fish tagged with passive integrated transponder (PIT) tags. We PIT tagged and released a total of 18,565 hatchery steelhead O. mykiss, 15,991 wild steelhead, and 9,714 wild yearling Chinook salmon O. tshawytscha at Lower Granite Dam in the Snake River. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream from the hydropower system and at sites within the hydropower system in both the Snake and Columbia Rivers. These included 122,061 yearling Chinook salmon tagged at Lower Granite Dam for evaluation of latent mortality related to passage through Snake River dams. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, Ice Harbor, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using a statistical model for tag-recapture data from single release groups (the single-release model). Primary research objectives in 2008 were to: (1) estimate reach survival and travel time in the Snake and Columbia Rivers throughout the migration period of yearling Chinook salmon and steelhead, (2) evaluate relationships between survival estimates and migration conditions, and (3) evaluate the survival estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2008 for PIT-tagged yearling Chinook salmon (hatchery and wild), hatchery sockeye salmon O. nerka, hatchery coho salmon O. kisutch, and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Additional details on the methodology and statistical models used are provided in previous reports cited here. Survival and detection probabilities were estimated precisely for most of the 2008 yearling Chinook salmon and steelhead migrations. Hatchery and wild fish were combined in some of the analyses. For yearling Chinook salmon, overall percentages for combined release groups used in survival analyses in the Snake River were 80% hatchery-reared and 20% wild. For steelhead, the overall percentages were 65% hatchery-reared and 35% wild. Estimated survival from the tailrace of Lower Granite Dam to the tailrace of Little Goose Dam averaged 0.939 for yearling Chinook salmon and 0.935 for steelhead.

  10. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2004 Annual Report.

    SciTech Connect (OSTI)

    DeHart, Michele

    2005-07-01

    The runoff volume for 2004 was below average throughout the Columbia Basin. At The Dalles the January-July runoff volume was 77% of average or 83.0 MAF. Grand Coulee, Hungry Horse, and Libby were below their Biological Opinion reservoir target elevations on April 10 at the beginning of the spring salmon migration season. All major storage reservoirs except Libby, Grand Coulee, Hungry Horse, Dworshak, and Brownlee were within a few feet of full by the end of June and early July. Overall, NOAA Biological Opinion seasonal flow targets were not met at any project for either spring or summer migrations of salmon and steelhead. Overall, spill was reduced in 2004. Implementation of Biological Opinion spill for fish passage measures was wrought with contention in 2004, particularly for summer spill which was finally the subject of litigation. The spring migration spill season began with debate among the fishery mangers and tribes and action agencies regarding spill at Bonneville Dam for the Spring Creek Hatchery release. The USFWS agreed to a spill test versus a corner collector operation to determine the best route for survival for these fish. The USFWS agreement includes no spill for early Spring Creek Hatchery releases for the next two years. Spring spill at Snake River transportation sites was eliminated after April 23, and transportation was maximized. The federal operators and regulators proposed to reduce Biological Opinion summer spill measures, while testing the impact of those reductions. This proposal was eventually rejected in challenges in the Federal Ninth Circuit Court. The Corps of Engineers reported that spill at Bonneville Dam in the 2002 to 2004 period was actually lower than reported due to a spill calibration error at the project. Because flows were low and spill levels were easily controlled few fish were observed with any signs of Gas Bubble Trauma. The annual Smolt Monitoring Program was implemented and provided in-season timing and passage characteristics for management purposes and also travel time and survival analyses. These analyses showed consistent significant relationships between flow and spill percent versus survival for Steelhead in each reach analyzed. These results point to the importance of maintain high flows and spill for steelhead survival through the hydrosystem. A significant relation between either travel time or spill percent and survival for yearling Chinook was found. Given the high correlation between the variables it is not surprising that only one is retained in these models. Again the findings show the importance of flows and spill in spring Chinook survival through the hydrosystem. Survival trends in the Lower Snake River have been steadily declining for in-river migrants over the past several years with two notable exceptions. The lowest survivals were measured in 2001 when low flows and very little or no spill was provided led to poor migration conditions. Also survival increased in 2003 when Biological Opinion spill was provided despite moderate to low flows. Reach survivals in 2004 in the Snake River were the second lowest following 2001. Sub-yearling survival in the mid-Columbia in 2004 between Rock Island and McNary Dam were very low compared to other recent years. The general run-at-large migration timing of sub-yearling fall Chinook in the Snake River has changed with the increasing releases of hatchery supplementation production in the Snake River.

  11. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    SciTech Connect (OSTI)

    Columbia River System Operation Review; United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  12. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect (OSTI)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  13. Observing System Simulation Experiments (OSSEs) for the Mid-Columbia Basin

    SciTech Connect (OSTI)

    Zack, J; Natenberg, E J; Knowe, G V; Waight, K; Manobianco, J; Hanley, D; Kamath, C

    2011-09-13

    The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height ({approx}80 m). In this phase of the project the focus is on the Mid-Columbia Basin region, which encompasses the Bonneville Power Administration (BPA) wind generation area (Figure 1) that includes the Klondike, Stateline, and Hopkins Ridge wind plants. There are two tasks in the current project effort designed to validate the Ensemble Sensitivity Analysis (ESA) observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. The results of this task are presented in a separate report. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Colombia basin region. This report presents the results of the OSSE task. The specific objective is to test strategies for future deployment of observing systems in order to suggest the best and most efficient ways to improve wind forecasting at BPA wind farm locations. OSSEs have been used for many years in meteorology to evaluate the potential impact of proposed observing systems, determine tradeoffs in instrument design, and study the most effective data assimilation methodologies to incorporate the new observations into numerical weather prediction (NWP) models (Atlas 1997; Lord 1997). For this project, a series of OSSEs will allow consideration of the impact of new observing systems of various types and in various locations.

  14. Ground water flow velocity in the bank of the Columbia River, Hanford, Washington

    SciTech Connect (OSTI)

    Ballard, S.

    1995-12-01

    To properly characterize the transport of contaminants from the sediments beneath the Hanford Site into the Columbia River, a suite of In Situ Permeable Flow Sensors was deployed to accurately characterize the hydrologic regime in the banks of the river. The three dimensional flow velocity was recorded on an hourly basis from mid May to mid July, 1994 and for one week in September. The first data collection interval coincided with the seasonal high water level in the river while the second interval reflected conditions during relatively low seasonal river stage. Two flow sensors located approximately 50 feet from the river recorded flow directions which correlated very well with river stage, both on seasonal and diurnal time scales. During time intervals characterized by falling river stage, the flow sensors recorded flow toward the river while flow away from the river was recorded during times of rising river stage. The flow sensor near the river in the Hanford Formation recorded a component of flow oriented vertically downward, probably reflecting the details of the hydrostratigraphy in close proximity to the probe. The flow sensor near the river in the Ringold Formation recorded an upward component of flow which dominated the horizontal components most of the time. The upward flow in the Ringold probably reflects regional groundwater flow into the river. The magnitudes of the flow velocities recorded by the flow sensors were lower than expected, probably as a result of drilling induced disturbance of the hydraulic properties of the sediments around the probes. The probes were installed with resonant sonic drilling which may have compacted the sediments immediately surrounding the probes, thereby reducing the hydraulic conductivity adjacent to the probes and diverting the groundwater flow away from the sensors.

  15. Electricity 101 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resources » Electricity 101 Electricity 101 FREQUENTLY ASKED QUESTIONS: Why do other countries use different shaped plugs? Why do outlets have three holes? Why do we have AC electricity? Can we harness lightning as an energy source? Can we have wireless transmission of electricity? SYSTEM: What is electricity? Where does electricity come from? What is the "grid"? How much electricity does a typical household use? How did the electric system evolve? What does the future look like?

  16. British Society of Interventional Radiology (BSIR) Inferior Vena Cava (IVC) Filter Registry

    SciTech Connect (OSTI)

    Uberoi, Raman Tapping, Charles Ross; Chalmers, Nicholas; Allgar, Victoria

    2013-12-15

    Purpose: The British Society of Interventional Radiology (BSIR) Inferior Vena Cava (IVC) Filter Registry was produced to provide an audit of current United Kingdom (UK) practice regarding placement and retrieval of IVC filters to address concerns regarding their safety. Methods: The IVC filter registry is a web-based registry, launched by the BSIR on behalf of its membership in October 2007. This report is based on prospectively collected data from October 2007 to March 2011. This report contains analysis of data on 1,434 IVC filter placements and 400 attempted retrievals performed at 68 UK centers. Data collected included patient demographics, insertion and retrieval data, and patient follow-up. Results: IVC filter use in the majority of patients in the UK follows accepted CIRSE guidelines. Filter placement is usually a low-risk procedure, with a low major complication rate (<0.5 %). Cook Gunther Tulip (560 filters: 39 %) and Celect (359 filters: 25 %) filters constituted the majority of IVC filters inserted, with Bard G2, Recovery filters, Cordis Trapease, and OptEase constituting most of the remainder (445 filters: 31 %). More than 96 % of IVC filters deployed as intended. Operator inexperience (<25 procedure) was significantly associated with complications (p < 0.001). Of the IVC filters initially intended for temporary placement, retrieval was attempted in 78 %. Of these retrieval was technically successful in 83 %. Successful retrieval was significantly reduced for implants left in situ for >9 weeks versus those with a shorter dwell time. New lower limb deep vein thrombosis (DVT) and/or IVC thrombosis was reported in 88 patients following filter placement, there was no significant difference of incidence between filter types. Conclusions: This registry report provides interventional radiologists and clinicians with an improved understanding of the technical aspects of IVC filter placement to help improve practice, and the potential consequences of IVC filter placement so that we are better able to advise patients. There is a significant learning curve associated with IVC filter insertion, and when a filter is placed with the intention of removal, procedures should be in place to avoid the patient being lost to follow-up.

  17. Thermoacoustic magnetohydrodynamic electrical generator

    DOE Patents [OSTI]

    Wheatley, John C. (Los Alamos, NM); Swift, Gregory W. (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

    1986-01-01

    A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1,000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

  18. Electrical system architecture

    DOE Patents [OSTI]

    Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

    2008-07-15

    An electrical system for a vehicle includes a first power source generating a first voltage level, the first power source being in electrical communication with a first bus. A second power source generates a second voltage level greater than the first voltage level, the second power source being in electrical communication with a second bus. A starter generator may be configured to provide power to at least one of the first bus and the second bus, and at least one additional power source may be configured to provide power to at least one of the first bus and the second bus. The electrical system also includes at least one power consumer in electrical communication with the first bus and at least one power consumer in electrical communication with the second bus.

  19. Integrated electrical connector

    DOE Patents [OSTI]

    Benett, William J.; Ackler, Harold D.

    2005-05-24

    An electrical connector is formed from a sheet of electrically conductive material that lies in between the two layers of nonconducting material that comprise the casing of an electrical chip. The connector is electrically connected to an electrical element embedded within the chip. An opening in the sheet is concentrically aligned with a pair of larger holes respectively bored through the nonconducting layers. The opening is also smaller than the diameter of an electrically conductive contact pin. However, the sheet is composed flexible material so that the opening adapts to the diameter of the pin when the pin is inserted therethrough. The periphery of the opening applies force to the sides of the pin when the pin is inserted, and thus holds the pin within the opening and in contact with the sheet, by friction. The pin can be withdrawn from the connector by applying sufficient axial force.

  20. Electric power monthly

    SciTech Connect (OSTI)

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  1. Thermoacoustic magnetohydrodynamic electrical generator

    DOE Patents [OSTI]

    Wheatley, J.C.; Swift, G.W.; Migliori, A.

    1984-11-16

    A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

  2. Renewable Electricity Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by Midwest Research Institute * Battelle Renewable Electricity Overview Bobi Garrett Associate Director, Renewable Electricity Science & Technology 12 August 2008 State Energy Advisory Board 2 National Renewable Energy Laboratory Innovation for Our Energy Transforming Our Electricity System Create Smart Grid Two-Way Power Flow Higher Capacity High Reliability/Self Healing

  3. Electric Power Monthly

    Gasoline and Diesel Fuel Update (EIA)

    Electric Power Monthly > Electric Power Monthly Back Issues Electric Power Monthly Back Issues Monthly Excel files zipped 2010 January February March April May June July August September October November December 2009 January February March April May June July August September October November December 2008 January February March March Supplement April May June July August September October November December 2007 January February March April May June July August September October November

  4. Electric Power Research Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -000 Electric Power Research Institute (EPRI) Workshop on High Performance Computing and Modeling Simulation Heather Feldman, Brenden Mervin Electric Power Research Insititute (EPRI) October 15-16, 2014 CASL-U-2015-0200-000 1 AGENDA WORKSHOP ON HIGH PERFORMANCE COMPUTING AND MODELING & SIMULATION "Overcoming Barriers to Enable the Electric Power Industry to Realize the Benefits of High Performance Computing and Modeling & Simulation" October 15-16, 2014 * EPRI Charlotte

  5. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Information and Staff The Electricity Monthly Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. Energy Information Administration (EIA), U.S. Department of Energy. Editorial Lead: Chris Cassar (christopher.cassar@eia.gov) Senior Adviser: Bill Booth Core Team: Paul McCardle, Glenn McGrath, Stephen Scott, Tim Shear, April Lee

  6. Office of Electricity Delivery

    Energy Savers [EERE]

    4 DOE Resilient Electric Distribution Grid R&D Workshop June 11, 2014 Upton, New York 2014 DOE Resilient Electric Distribution Grid R&D Workshop Report Page i June 24, 2014 Acknowledgment The U.S. Department of Energy (DOE) acknowledges the support provided by the organizations represented at the Resilient Electric Distribution Grid R&D Workshop. The report content is based on the workshop session discussions, with session summary descriptions taken from the report-out presentations

  7. Electricity Monthly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Wholesale Markets: February 2014 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

  8. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy),...

  9. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    costs, of which fuel costs account for the lion's share. Therefore, we present below, electricity generation output by fuel type and generator type. Since the generatorfuel...

  10. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Wholesale Markets: May 2015 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

  11. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wholesale Markets: August 2015 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

  12. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and fuel consumption In this section, we look at the resources used to produce electricity. Generating units are chosen to run primarily on their operating costs, of which...

  13. 2013 Electricity Form Proposals

    Gasoline and Diesel Fuel Update (EIA)

    Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice

  14. Perforation patterned electrical interconnects

    DOE Patents [OSTI]

    Frey, Jonathan

    2014-01-28

    This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

  15. Electrically conductive cellulose composite

    DOE Patents [OSTI]

    Evans, Barbara R.; O'Neill, Hugh M.; Woodward, Jonathan

    2010-05-04

    An electrically conductive cellulose composite includes a cellulose matrix and an electrically conductive carbonaceous material incorporated into the cellulose matrix. The electrical conductivity of the cellulose composite is at least 10 .mu.S/cm at 25.degree. C. The composite can be made by incorporating the electrically conductive carbonaceous material into a culture medium with a cellulose-producing organism, such as Gluconoacetobacter hansenii. The composites can be used to form electrodes, such as for use in membrane electrode assemblies for fuel cells.

  16. Electric Storage Water Heaters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Events Expand News & Events Skip navigation links Residential Residential Lighting Energy Star Appliances Consumer Electronics Heat Pump Water Heaters Electric Storage Water...

  17. Renewable Electricity Generation

    SciTech Connect (OSTI)

    2012-09-01

    This document highlights DOE's Office of Energy Efficiency and Renewable Energy's advancements in renewable electricity generation technologies including solar, water, wind, and geothermal.

  18. Electricity Monthly Update

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also...

  19. Department of Energy - Electricity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    opportunities and challenges that lie ahead. Secretary Moniz headed down to Florida to talk about Grid Modernization. Learn more about our nation's electric grid in this fact...

  20. Electricity Monthly Update

    Gasoline and Diesel Fuel Update (EIA)

    ... All states from the Rocky Mountains to the Pacific Ocean, except for Montana and Wyoming, ... Therefore, one can often explain current wholesale electricity prices by looking at what ...

  1. Electric Power Annual 2011

    U.S. Energy Information Administration (EIA) Indexed Site

    B Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation Region, 2001-2011 Actual, 2012-2016 Projected megawatts ...

  2. Electric power annual 1992

    SciTech Connect (OSTI)

    Not Available

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  3. 2015 Electricity Form Proposals

    U.S. Energy Information Administration (EIA) Indexed Site

    Proposed Changes to Electricity and Renewable (Photovoltaic) Survey Forms November 19, 2015 In early 2016 the U.S. Energy Information Administration (EIA) will formally propose ...

  4. 2015 Electricity Form Proposals

    U.S. Energy Information Administration (EIA) Indexed Site

    Quarterly Electricity Imports and Exports Report (EIA-111) OMB Clearance Renewal in 2015 The U.S. Energy Information Administration (EIA) has received approval from the Office of ...

  5. Electrical Circuit Tester

    DOE Patents [OSTI]

    Love, Frank (Amarillo, TX)

    2006-04-18

    An electrical circuit testing device is provided, comprising a case, a digital voltage level testing circuit with a display means, a switch to initiate measurement using the device, a non-shorting switching means for selecting pre-determined electrical wiring configurations to be tested in an outlet, a terminal block, a five-pole electrical plug mounted on the case surface and a set of adapters that can be used for various multiple-pronged electrical outlet configurations for voltages from 100 600 VAC from 50 100 Hz.

  6. EIA - Electricity Generating Capacity

    U.S. Energy Information Administration (EIA) Indexed Site

    Electricity Generating Capacity Release Date: January 3, 2013 | Next Release: August 2013 Year Existing Units by Energy Source Unit Additions Unit Retirements 2011 XLS XLS XLS 2010...

  7. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Mississippi Electricity Profile 2013 Table 1. 2013 Summary statistics (Mississippi) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 15,561 28...

  8. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Massachusetts Electricity Profile 2013 Table 1. 2013 Summary statistics (Massachusetts) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 13,678 32...

  9. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Connecticut Electricity Profile 2013 Table 1. 2013 Summary statistics (Connecticut) Item Value U.S. Rank Primary energy source Nuclear Net summer capacity (megawatts) 8,769 35...

  10. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    North Carolina Electricity Profile 2013 Table 1. 2013 Summary statistics (North Carolina) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 30,048 12...

  11. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Rhode Island Electricity Profile 2013 Table 1. 2013 Summary statistics (Rhode Island) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 1,809 49...

  12. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    West Virginia Electricity Profile 2013 Table 1. 2013 Summary statistics (West Virginia) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 16,282 24...

  13. Electricity Monthly Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electricity Monthly Update Explained Highlights The Highlights page features in the center a short article about a major event or an informative topic. The left column contains...

  14. Electric Power Monthly

    U.S. Energy Information Administration (EIA) Indexed Site

    ... In 1997, the SIC Manual name was changed to North American ... Education services 622 Health services 624 Social ... | Electric Power Monthly Public Administration 92 Multiple ...

  15. Electric Utility Industry Update

    Broader source: Energy.gov [DOE]

    Presentationgiven at the April 2012 Federal Utility Partnership Working Group (FUPWG) meetingcovers significant electric industry trends and industry priorities with federal customers.

  16. Electricity Generation, Transmission ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation, Transmission and Energy Storage Systems Utilities and other electricity and transmission providers and regulators often require that equipment be proven safe and ...

  17. electric energy storage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electric energy storage - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power ...

  18. Resilient Electric Infrastructures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Weather-related and other natural disasters, which cause the bulk of power outages, ... As a consequence, our nation faces significant risk from prolonged electrical outages, which, ...

  19. Migratory Behavior and Survival of Juvenile Salmonids in the Lower Columbia River, Estuary, and Plume in 2010

    SciTech Connect (OSTI)

    McMichael, Geoffrey A.; Harnish, Ryan A.; Skalski, John R.; Deters, Katherine A.; Ham, Kenneth D.; Townsend, Richard L.; Titzler, P. Scott; Hughes, Michael S.; Kim, Jin A.; Trott, Donna M.

    2011-09-01

    Uncertainty regarding the migratory behavior and survival of juvenile salmonids passing through the lower Columbia River and estuary after negotiating dams on the Federal Columbia River Power System (FCRPS) prompted the development and application of the Juvenile Salmon Acoustic Telemetry System (JSATS). The JSATS has been used to investigate the survival of juvenile salmonid smolts between Bonneville Dam (river kilometer (rkm) 236) and the mouth of the Columbia River annually since 2004. In 2010, a total of 12,214 juvenile salmonids were implanted with both a passive integrated transponder (PIT) and a JSATS acoustic transmitter. Using detection information from JSATS receiver arrays deployed on dams and in the river, estuary, and plume, the survival probability of yearling Chinook salmon and steelhead smolts tagged at John Day Dam was estimated form multiple reaches between rkm 153 and 8.3 during the spring. During summer, the survival probability of subyearling Chinook salmon was estimated for the same reaches. In addition, the influence of routes of passage (e.g., surface spill, deep spill, turbine, juvenile bypass system) through the lower three dams on the Columbia River (John Day, The Dalles, and Bonneville) on juvenile salmonid smolt survival probability from the dams to rkm 153 and then between rkm 153 and 8.3 was examined to increase understanding of the immediate and latent effects of dam passage on juvenile salmon survival. Similar to previous findings, survival probability was relatively high (>0.95) for most groups of juvenile salmonids from the Bonneville Dam tailrace to about rkm 50. Downstream of rkm 50 the survival probability of all species and run types we examined decreased markedly. Steelhead smolts suffered the highest mortality in this lower portion of the Columbia River estuary, with only an estimated 60% of the tagged fish surviving to the mouth of the river. In contrast, yearling and subyearling Chinook salmon smolts survived to the mouth of the river at higher rates, with estimated survival probabilities of 84% and 86%, respectively. The influence of route of passage at the lower three dams in the FCRPS on juvenile salmonid survival appeared to be relatively direct and immediate. Significant differences in estimated survival probabilities of juvenile salmonid smolts among groups with different dam passage experiences were often detected between the dams and rkm 153. In contrast, the influence of route of passage on survival to the mouth of the Columbia River was not apparent among the groups of tagged juvenile salmonids with different FCRPS passage experiences after they had already survived to a point about 80 km downstream of Bonneville Dam. Yearling Chinook salmon and steelhead smolts that migrated through the lower estuary in off-channel habitats took two to three times longer to travel through these lower reaches and their estimated survival probabilities were not significantly different from that of their cohorts which migrated in or near the navigation channel. A large proportion of the tagged juvenile salmonids migrating in or near the navigation channel in the lower estuary crossed from the south side of the estuary near Astoria, Oregon and passed through relatively shallow expansive sand flats (Taylor Sands) to the North Channel along the Washington shore of the estuary. This migratory behavior may contribute to the avian predation losses observed on for fish (2 to 12% of fish in this study).

  20. Estuarine Landcover Along the Lower Columbia River Estuary Determined from Compact Ariborne Spectrographic Imager (CASI) Imagery, Technical Report 2003.

    SciTech Connect (OSTI)

    Garono, Ralph; Robinson, Rob

    2003-10-01

    Developing an understanding of the distribution and changes in estuarine and riparian habitats is critical to the management of biological resources in the lower Columbia River. In a recently completed comprehensive ecosystem protection and enhancement plan for the lower Columbia River Estuary (CRE), Jerrick (1999) identified habitat loss and modification as one of the key threats to the integrity of the CRE ecosystem. This management plan called for an inventory of habitats as key first step in the CRE long-term restoration effort. While previous studies have produced useful data sets depicting habitat cover types along portions of the lower CRE (Thomas, 1980; Thomas, 1983; Graves et al., 1995; NOAA, 1997; Allen, 1999), no single study has produced a description of the habitats for the entire CRE. Moreover, the previous studies differed in data sources and methodologies making it difficult to merge data or to make temporal comparisons. Therefore, the Lower Columbia River Estuary Partnership (Estuary Partnership) initiated a habitat cover mapping project in 2000. The goal of this project was to produce a data set depicting the current habitat cover types along the lower Columbia River, from its mouth to the Bonneville Dam, a distance of {approx}230-km (Fig. 1) using both established and emerging remote sensing techniques. For this project, we acquired two types of imagery, Landsat 7 ETM+ and Compact Airborne Spectrographic Imager (CASI). Landsat and CASI imagery differ in spatial and spectral resolution: the Landsat 7 ETM+ sensor collects reflectance data in seven spectral bands with a spatial resolution of 30-m and the CASI sensor collects reflectance data in 19 bands (in our study) with a spatial resolution of 1.5-m. We classified both sets of imagery and produced a spatially linked, hierarchical habitat data set for the entire CRE and its floodplain. Landsat 7 ETM+ classification results are presented in a separate report (Garono et al., 2003). This report presents classification results from analysis of the CASI imagery. Data sets produced for this project from both types of imagery fill a critical information gap by creating a current description of the condition and extent of estuarine habitat cover types along the lower Columbia River. Results from this study will be used by the Estuary Partnership and its cooperators to: (1) develop indicators of 'habitat health' and biological integrity; (2) develop definitions of 'critical salmonid habitat'; (3) identify and evaluate potential wetland conservation and restoration sites; (4) track exotic and invasive species; and (5) develop an understanding of how estuarine and riverine habitats have changed over the past 200 years. This study focuses on estuarine and riparian habitat cover types important to native species, particularly juvenile salmonids. This study is meant to provide support to the multiple efforts currently underway to recover 12 species of Columbia River salmonids identified as endangered or threatened under the Endangered Species Act.

  1. Identification of the Spawning, Rearing and Migratory Requirements of Fall Chinook Salmon in the Columbia River Basin, Annual Report 1992.

    SciTech Connect (OSTI)

    Rondorf, Dennis W.; Miller, William H.

    1994-03-01

    This document is the 1992 annual progress report for selected studies of fall chinook Salmon Oncorhynchus tshawytscha conducted by the National Biological Survey (NBS) and the US Fish and Wildlife Service. The decline in abundance of fall chinook salmon in the Snake River basin has become a growing concern. Effective recovery efforts for fall chinook salmon cannot be developed until we increase our knowledge of the factors that are limiting the various life history stages. This study attempts to identify those physical and biological factors which influence spawning of fall chinook salmon in the free-flowing Snake River and their rearing and seaward migration through Columbia River basin reservoirs.

  2. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 2001 Annual Report.

    SciTech Connect (OSTI)

    Nugent, John; Nugent, Michael; Brock, Wendy

    2002-05-29

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach of the Columbia River. The evaluation, in the fifth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2001 field season.

  3. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corp. , Columbus, Ohio. Final report

    SciTech Connect (OSTI)

    1980-11-01

    The Solar Energy System located at the Columbia Gas Corporation, Columbus, Ohio, has 2978 ft/sup 2/ of Honeywell single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/h Bryan water-tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton Arkla hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts are included from the site files, specification references, drawings, installation, operation and maintenance instructions.

  4. The Oncor Geodatabase for the Columbia Estuary Ecosystem Restoration Program: Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates

    SciTech Connect (OSTI)

    Sather, Nichole K.; Borde, Amy B.; Diefenderfer, Heida L.; Serkowski, John A.; Coleman, Andre M.; Johnson, Gary E.

    2013-12-31

    This Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates is designed to support the Oncor geodatabase for the Columbia Estuary Ecosystem Restoration Program (CEERP). The following data categories are covered: water-surface elevation and temperature, sediment accretion rate, photo points, herbaceous wetland vegetation cover, tree plots and site summaries, fish catch and density, fish size, fish diet, fish prey, and Chinook salmon genetic stock identification. The handbook is intended for use by scientists collecting monitoring and research data for the CEERP. The ultimate goal of Oncor is to provide quality, easily accessible, geospatial data for synthesis and evaluation of the collective performance of CEERP ecosystem restoration actions at a program scale.

  5. Effects of Dissolved Gas Supersaturation on Fish Residing in the Snake and Columbia Rivers, 1996 Annual Report.

    SciTech Connect (OSTI)

    Schrank, Boyd P.

    1998-03-01

    Increased spill at dams has commonly brought dissolved gas supersaturation higher than levels established by state and federal water quality criteria in the Columbia and Snake Rivers. These increased spill volumes are intended to provide safe passage for migrating juvenile salmon. However, dissolved gas supersaturation resulting from spill in past decades has led to gas bubble disease (GBD) in fish. Therefore, during the period of high spill in 1996, the authors monitored the prevalence and severity of gas bubble disease by sampling resident fish in Priest Rapids Reservoir and downstream from Bonneville, Priest Rapids, and Ice Harbor Dams.

  6. Energy 101: Electric Vehicles

    ScienceCinema (OSTI)

    None

    2013-05-29

    This edition of Energy 101 highlights the benefits of electric vehicles, including improved fuel efficiency, reduced emissions, and lower maintenance costs. For more information on electric vehicles from the Office of Energy Efficiency and Renewable Energy, visit the Vehicle Technologies Program website: http://www1.eere.energy.gov/vehiclesandfuels/

  7. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Hand, M.

    2012-10-01

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It is being presented at the Utility Variable-Generation Integration Group Fall Technical Workshop on October 24, 2012.

  8. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2012-08-01

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in a Power Systems Engineering Research Center webinar on September 4, 2012.

  9. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Hand, M.; Mai, T.

    2012-08-01

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in an Union of Concerned Scientists webinar on June 12, 2012.

  10. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Mai, T.

    2012-08-01

    This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. This presentation was presented in a Wind Powering America webinar on August 15, 2012 and is now available through the Wind Powering America website.

  11. Electrically conductive diamond electrodes

    DOE Patents [OSTI]

    Swain, Greg (East Lansing, MI); Fischer, Anne (Arlington, VA),; Bennett, Jason (Lansing, MI); Lowe, Michael (Holt, MI)

    2009-05-19

    An electrically conductive diamond electrode and process for preparation thereof is described. The electrode comprises diamond particles coated with electrically conductive doped diamond preferably by chemical vapor deposition which are held together with a binder. The electrodes are useful for oxidation reduction in gas, such as hydrogen generation by electrolysis.

  12. Electrical Circuit Simulation Code

    Energy Science and Technology Software Center (OSTI)

    2001-08-09

    Massively-Parallel Electrical Circuit Simulation Code. CHILESPICE is a massively-arallel distributed-memory electrical circuit simulation tool that contains many enhanced radiation, time-based, and thermal features and models. Large scale electronic circuit simulation. Shared memory, parallel processing, enhance convergence. Sandia specific device models.

  13. Renewable Electricity Futures (Presentation)

    SciTech Connect (OSTI)

    Hand, M. M.

    2012-08-01

    This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in a webinar given by the California Energy Commission.

  14. Hawaii electric system reliability.

    SciTech Connect (OSTI)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  15. Alternative Fuels Data Center: Electricity

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Electricity Printable Version Share this resource Send a link to Alternative Fuels Data Center: Electricity to someone by E-mail Share Alternative Fuels Data Center: Electricity on Facebook Tweet about Alternative Fuels Data Center: Electricity on Twitter Bookmark Alternative Fuels Data Center: Electricity on Google Bookmark Alternative Fuels Data Center: Electricity on Delicious Rank Alternative Fuels Data Center: Electricity on Digg Find More places to share Alternative Fuels Data Center:

  16. Rainwater Wildlife Area Habitat Evaluation Procedures Report; A Columbia Basin Wildlife Mitigation Project.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2004-01-01

    The 8,768 acre Rainwater Wildlife Area was acquired in September 1998 by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through an agreement with Bonneville Power Administration (BPA) to partially offset habitat losses associated with construction of the John Day and McNary hydroelectric facilities on the mainstem Columbia River. U.S. Fish and Wildlife Service (USFWS) Habitat Evaluation Procedures (HEP) were used to determine the number of habitat units credited to BPA for acquired lands. Upland and riparian forest, upland and riparian shrub, and grassland cover types are evaluated in this study. Targeted wildlife species include downy woodpecker (Picoides pubescens), black-capped chickadee (Parus atricopillus), blue grouse (Dendragapus obscurus), great blue heron (Ardea herodias), yellow warbler (Dendroica petechia), mink (Mustela vison), and Western meadowlark (Sturnella neglecta). Habitat surveys were conducted in 1998 and 1999 in accordance with published HEP protocols and included 65,300, 594m{sup 2}2 plots, and 112 one-tenth-acre plots. Between 153.3 and 7,187.46 acres were evaluated for each target wildlife mitigation species. Derived habitat suitability indices were multiplied by corresponding cover-type acreages to determine the number of habitat units for each species. The total baseline habitat units credited to BPA for the Rainwater Wildlife Area and its seven target species is 5,185.3 habitat units. Factors limiting habitat suitability are related to the direct, indirect, and cumulative effects of past livestock grazing, road construction, and timber harvest which have simplified the structure, composition, and diversity of native plant communities. Alternatives for protecting and improving habitat suitability include exclusion of livestock grazing, road de-commissioning/obliteration, reforestation and thinning, control of competing and unwanted vegetation (including noxious weeds), reestablishing displaced or reduced native vegetation species, allowance of normative processes such as fire occurrence, and facilitating development of natural stable stream channels and associated floodplains. Implementation of habitat enhancement and restoration activities could generate an additional 1,850 habitat units in 10 years. Baseline and estimated future habitat units total 7,035.3 for the Rainwater Wildlife Area. Habitat protection, enhancement and restoration will require long-term commitments from managers to increase probabilities of success and meet the goals and objectives of the Northwest Power Planning Council's Fish and Wildlife Mitigation Program.

  17. Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program.

    SciTech Connect (OSTI)

    Johnson, Gary E.; Diefenderfer, Heida L.

    2008-02-20

    The purpose of this document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program, hereafter called 'the Estuary Program'. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows: (1) Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. (2) Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. (3) Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. (4) Maintain the food web to benefit salmonid performance. (5) Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. The goal leads to three primary management questions pertaining to the main focus of the Estuary Program: estuary habitat conservation and restoration. (1) Are the estuary habitat actions achieving the expected biological and environmental performance targets? (2) Are the offsite habitat actions in the estuary improving juvenile salmonid performance and which actions are most effective at addressing the limiting factors preventing achievement of habitat, fish, or wildlife performance objectives? (3) What are the limiting factors or threats in the estuary/ocean preventing the achievement of desired habitat or fish performance objectives? Performance measures for the estuary are monitored indicators that reflect the status of habitat conditions and fish performance, e.g., habitat connectivity, survival, and life history diversity. Performance measures also pertain to implementation and compliance. Such measures are part of the monitoring, research, and action plans in this estuary RME document. Performance targets specific to the estuary were not included in the 2007 draft Biological Opinion.

  18. Electric power monthly

    SciTech Connect (OSTI)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  19. Electric turbocompound control system

    DOE Patents [OSTI]

    Algrain, Marcelo C. (Dunlap, IL)

    2007-02-13

    Turbocompound systems can be used to affect engine operation using the energy in exhaust gas that is driving the available turbocharger. A first electrical device acts as a generator in response to turbocharger rotation. A second electrical device acts as a motor to put mechanical power into the engine, typically at the crankshaft. Apparatus, systems, steps, and methods are described to control the generator and motor operations to control the amount of power being recovered. This can control engine operation closer to desirable parameters for given engine-related operating conditions compared to actual. The electrical devices can also operate in "reverse," going between motor and generator functions. This permits the electrical device associated with the crankshaft to drive the electrical device associated with the turbocharger as a motor, overcoming deficient engine operating conditions such as associated with turbocharger lag.

  20. Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta, Lower Columbia River, 2007

    SciTech Connect (OSTI)

    Sobocinski, Kathryn L.; Johnson, Gary E.; Sather, Nichole K.; Storch, Adam; Jones, Tucker A.; Mallette, Christine; Dawley, Earl M.; Skalski, John R.; Teel, David; Moran, Paul

    2008-03-18

    This document is the first annual report for the study titled Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta in the Lower Columbia River. Hereafter, we refer to this research as the Tidal Freshwater Monitoring (TFM) Study. The study is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The project is performed under the auspices of the Northwest Power and Conservation Councils Columbia Basin Fish and Wildlife Program.

  1. Electric Resistance Heating Basics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Resistance Heating Basics Electric Resistance Heating Basics August 16, 2013 - 3:10pm Addthis Electric resistance heat can be supplied by centralized forced-air electric furnaces or by heaters in each room. Electric resistance heating converts nearly all of the energy in the electricity to heat. Types of Electric Resistance Heaters Electric resistance heat can be provided by electric baseboard heaters, electric wall heaters, electric radiant heat, electric space heaters, electric

  2. Assessment of Subyearling Chinook Salmon Survival through the Federal Hydropower Projects in the Main-Stem Columbia River

    SciTech Connect (OSTI)

    Skalski, J. R.; Eppard, M. B.; Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.; Townsend, Richard L.

    2014-07-11

    High survival through hydropower projects is an essential element in the recovery of salmonid populations in the Columbia River. It is also a regulatory requirement under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) established under the Endangered Species Act. It requires dam passage survival to be ≥0.96 and ≥0.93 for spring and summer outmigrating juvenile salmonids, respectively, and estimated with a standard error ≤ 0.015. An innovative virtual/paired-release design was used to estimate dam passage survival, defined as survival from the face of a dam to the tailrace mixing zone. A coordinated four-dam study was conducted during the 2012 summer outmigration using 14,026 run-of-river subyearling Chinook salmon surgically implanted with acoustic micro-transmitter (AMT) tags released at 9 different locations, and monitored on 14 different detection arrays. Each of the four estimates of dam passage survival exceeded BiOp requirements with values ranging from 0.9414 to 0.9747 and standard errors, 0.0031 to 0.0114. Two consecutive years of survival estimates must meet BiOp standards in order for a hydropower project to be in compliance with recovery requirements for a fish stock.

  3. Qualitative assessment of the impacts of proposed system operating strategies to resident fish within selected Columbia River Reservoirs

    SciTech Connect (OSTI)

    Shreffler, D.K.; Geist, D.R.; Mavros, W.V.

    1994-01-01

    The Bonneville Power Administration (BPA), Bureau of Reclamation (BOR), and US Army Corps of Engineers (COE) are presently conducting the System Operation Review (SOR) for the Columbia River basin. The SOR began in 1990 and is expected to provide an operating strategy that will take into consideration multiple uses of the Columbia River system including navigation, flood control, irrigation, power generation, fish migration, fish and wildlife habitat, recreation, water supply, and water quality. This report provides descriptions of each of the non-modeled reservoirs and other specified river reaches. The descriptions focus on the distinct management goals for resident fish: biodiversity, species-specific concerns, and sport fisheries. In addition, this report provides a qualitative assessment of impacts to the resident fish within these reservoirs and river reaches from the 7 alternative system operating strategies. In addition to this introduction, the report contains four more sections. Section 2.0 provides the methods that were used. Reservoir descriptions appear in Section 3.0, which is a synthesis of our literature review and interviews with resident fish experts. Section 4.0 contains a discussion of potential impacts to fish within each of these reservoirs and river reaches from the 7 proposed system operating strategies. The references cited are listed in Section 5.0.

  4. Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA

    SciTech Connect (OSTI)

    Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.; Khan, Fenton; Mueller, Robert P.; Nagy, William T.; Richmond, Marshall C.; Weiland, Mark A.

    2008-07-29

    Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to merging and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.

  5. Review of Monitoring Plans for Gas Bubble Disease Signs and Gas Supersaturation Levels on the Columbia and Snake Rivers.

    SciTech Connect (OSTI)

    Fidler, Larry; Elston, Ralph; Colt, John

    1994-07-01

    Montgomery Watson was retained by the Bonneville Power Administration to evaluate the monitoring program for gas bubble disease signs and dissolved gas supersaturation levels on the Columbia and Snake rivers. The results of this evaluation will provide the basis for improving protocols and procedures for future monitoring efforts. Key study team members were Dr. John Colt, Dr. Larry Fidler, and Dr. Ralph Elston. On the week of June 6 through 10, 1994 the study team visited eight monitoring sites (smolt, adult, and resident fish) on the Columbia and Snake rivers. Additional protocol evaluations were conducted at the Willard Field Station (National Biological Survey) and Pacific Northwest Laboratories at Richland (Battelle). On June 13 and 14, 1994, the study team visited the North Pacific Division office of the U.S. Corps of Engineers and the Fish Passage Center to collect additional information and data on the monitoring programs. Considering the speed at which the Gas Bubble Trauma Monitoring Program was implemented this year, the Fish Passage Center and cooperating Federal, State, and Tribal Agencies have been doing an incredible job. Thirty-one specific recommendations are presented in this report and are summarized in Section 14.

  6. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Alaska Electricity Profile 2013 Table 1. 2013 Summary statistics (Alaska) Item Value Rank Primary energy source Natural Gas Net summer capacity (megawatts) 2,384 48 Electric utilities 2,205 39 IPP & CHP 179 50 Net generation (megawatthours) 6,496,822 49 Electric utilities 5,851,727 39 IPP & CHP 645,095 49 Emissions Sulfur dioxide (short tons) 4,202 43 Nitrogen oxide (short tons) 18,043 37 Carbon dioxide (thousand metric tons) 3,768 44 Sulfur dioxide (lbs/MWh) 1.3 29 Nitrogen oxide

  7. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Arizona Electricity Profile 2013 Table 1. 2013 Summary statistics (Arizona) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 27,910 13 Electric utilities 20,668 12 IPP & CHP 7,242 16 Net generation (megawatthours) 113,325,986 12 Electric utilities 92,740,582 8 IPP & CHP 20,585,405 15 Emissions Sulfur dioxide (short tons) 23,716 31 Nitrogen oxide (short tons) 59,416 15 Carbon dioxide (thousand metric tons) 55,342 16 Sulfur dioxide (lbs/MWh) 0.4 42 Nitrogen

  8. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    California Electricity Profile 2013 Table 1. 2013 Summary statistics (California) Item Value U.S. Rank Primary energy source Natural Gas Net summer capacity (megawatts) 73,772 2 Electric utilities 28,165 4 IPP & CHP 45,607 2 Net generation (megawatthours) 200,077,115 5 Electric utilities 78,407,643 14 IPP & CHP 121,669,472 4 Emissions Sulfur dioxide (short tons) 2,109 48 Nitrogen oxide (short tons) 96,842 5 Carbon dioxide (thousand metric tons) 57,323 13 Sulfur dioxide (lbs/MWh) 0.0 49

  9. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Colorado Electricity Profile 2013 Table 1. 2013 Summary statistics (Colorado) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 14,769 30 Electric utilities 10,238 28 IPP & CHP 4,531 20 Net generation (megawatthours) 52,937,436 28 Electric utilities 42,508,826 25 IPP & CHP 10,428,610 29 Emissions Sulfur dioxide (short tons) 40,012 27 Nitrogen oxide (short tons) 49,623 21 Carbon dioxide (thousand metric tons) 39,387 20 Sulfur dioxide (lbs/MWh) 1.5 27 Nitrogen

  10. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Connecticut Electricity Profile 2013 Table 1. 2013 Summary statistics (Connecticut) Item Value U.S. Rank Primary energy source Nuclear Net summer capacity (megawatts) 8,769 35 Electric utilities 152 46 IPP & CHP 8,617 13 Net generation (megawatthours) 35,610,789 38 Electric utilities 50,273 45 IPP & CHP 35,560,516 10 Emissions Sulfur dioxide (short tons) 3,512 45 Nitrogen oxide (short tons) 9,372 45 Carbon dioxide (thousand metric tons) 8,726 41 Sulfur dioxide (lbs/MWh) 0.2 47 Nitrogen

  11. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Delaware Electricity Profile 2013 Table 1. 2013 Summary statistics (Delaware) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 3,246 46 Electric utilities 102 47 IPP & CHP 3,144 32 Net generation (megawatthours) 7,760,861 47 Electric utilities 25,986 47 IPP & CHP 7,734,875 34 Emissions Sulfur dioxide (short tons) 2,241 47 Nitrogen oxide (short tons) 2,585 48 Carbon dioxide (thousand metric tons) 4,722 43 Sulfur dioxide (lbs/MWh) 0.6 40 Nitrogen oxide

  12. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Florida Electricity Profile 2013 Table 1. 2013 Summary statistics (Florida) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 58,781 3 Electric utilities 50,967 1 IPP & CHP 7,813 15 Net generation (megawatthours) 222,398,924 3 Electric utilities 202,527,297 1 IPP & CHP 19,871,627 18 Emissions Sulfur dioxide (short tons) 117,797 12 Nitrogen oxide (short tons) 88,345 6 Carbon dioxide (thousand metric tons) 108,431 3 Sulfur dioxide (lbs/MWh) 1.1 34

  13. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Georgia Electricity Profile 2013 Table 1. 2013 Summary statistics (Georgia) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 38,210 7 Electric utilities 28,875 2 IPP & CHP 9,335 10 Net generation (megawatthours) 120,953,734 10 Electric utilities 107,082,884 4 IPP & CHP 13,870,850 26 Emissions Sulfur dioxide (short tons) 123,735 10 Nitrogen oxide (short tons) 55,462 20 Carbon dioxide (thousand metric tons) 56,812 15 Sulfur dioxide (lbs/MWh) 2.0 20

  14. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Hawaii Electricity Profile 2013 Table 1. 2013 Summary statistics (Hawaii) Item Value U.S. Rank Primary energy source Petroleum Net summer capacity (megawatts) 2,757 47 Electric utilities 1,821 40 IPP & CHP 937 45 Net generation (megawatthours) 10,267,052 45 Electric utilities 5,748,256 40 IPP & CHP 4,518,796 40 Emissions Sulfur dioxide (short tons) 20,710 33 Nitrogen oxide (short tons) 25,416 31 Carbon dioxide (thousand metric tons) 7,428 42 Sulfur dioxide (lbs/MWh) 4.0 5 Nitrogen oxide

  15. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Idaho Electricity Profile 2013 Table 1. 2013 Summary statistics (Idaho) Item Value U.S. Rank Primary energy source Hydroelectric Net summer capacity (megawatts) 4,924 42 Electric utilities 3,394 37 IPP & CHP 1,530 39 Net generation (megawatthours) 15,186,128 43 Electric utilities 9,600,216 36 IPP & CHP 5,585,912 39 Emissions Sulfur dioxide (short tons) 6,565 42 Nitrogen oxide (short tons) 7,627 46 Carbon dioxide (thousand metric tons) 1,942 49 Sulfur dioxide (lbs/MWh) 0.9 37 Nitrogen

  16. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Illinois Electricity Profile 2013 Table 1. 2013 Summary statistics (Illinois) Item Value U.S. Rank Primary energy source Nuclear Net summer capacity (megawatts) 44,950 4 Electric utilities 5,269 35 IPP & CHP 39,681 4 Net generation (megawatthours) 203,004,919 4 Electric utilities 11,571,734 35 IPP & CHP 191,433,185 3 Emissions Sulfur dioxide (short tons) 203,951 6 Nitrogen oxide (short tons) 63,358 11 Carbon dioxide (thousand metric tons) 97,812 6 Sulfur dioxide (lbs/MWh) 2.0 21 Nitrogen

  17. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Indiana Electricity Profile 2013 Table 1. 2013 Summary statistics (Indiana) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 27,196 14 Electric utilities 23,309 8 IPP & CHP 3,888 24 Net generation (megawatthours) 110,403,477 13 Electric utilities 96,047,678 7 IPP & CHP 14,355,799 23 Emissions Sulfur dioxide (short tons) 273,718 4 Nitrogen oxide (short tons) 121,681 3 Carbon dioxide (thousand metric tons) 98,895 5 Sulfur dioxide (lbs/MWh) 5.0 2 Nitrogen

  18. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Iowa Electricity Profile 2013 Table 1. 2013 Summary statistics (Iowa) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 15,929 25 Electric utilities 12,092 21 IPP & CHP 3,837 26 Net generation (megawatthours) 56,670,757 27 Electric utilities 41,932,708 26 IPP & CHP 14,738,048 22 Emissions Sulfur dioxide (short tons) 106,879 14 Nitrogen oxide (short tons) 44,657 25 Carbon dioxide (thousand metric tons) 39,175 21 Sulfur dioxide (lbs/MWh) 3.8 6 Nitrogen oxide

  19. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Kansas Electricity Profile 2013 Table 1. 2013 Summary statistics (Kansas) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 14,093 32 Electric utilities 11,593 24 IPP & CHP 2,501 35 Net generation (megawatthours) 48,472,581 32 Electric utilities 39,808,763 28 IPP & CHP 8,663,819 32 Emissions Sulfur dioxide (short tons) 30,027 30 Nitrogen oxide (short tons) 30,860 30 Carbon dioxide (thousand metric tons) 33,125 27 Sulfur dioxide (lbs/MWh) 1.2 30 Nitrogen

  20. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Kentucky Electricity Profile 2013 Table 1. 2013 Summary statistics (Kentucky) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 21,004 21 Electric utilities 19,599 16 IPP & CHP 1,405 40 Net generation (megawatthours) 89,741,021 18 Electric utilities 89,098,127 11 IPP & CHP 642,894 50 Emissions Sulfur dioxide (short tons) 190,782 7 Nitrogen oxide (short tons) 87,201 7 Carbon dioxide (thousand metric tons) 85,304 7 Sulfur dioxide (lbs/MWh) 4.3 4 Nitrogen oxide

  1. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Louisiana Electricity Profile 2013 Table 1. 2013 Summary statistics (Louisiana) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 26,228 15 Electric utilities 17,297 17 IPP & CHP 8,931 12 Net generation (megawatthours) 102,010,177 15 Electric utilities 56,226,016 17 IPP & CHP 45,784,161 8 Emissions Sulfur dioxide (short tons) 122,578 11 Nitrogen oxide (short tons) 82,286 9 Carbon dioxide (thousand metric tons) 58,274 12 Sulfur dioxide (lbs/MWh) 2.4 16

  2. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Maine Electricity Profile 2013 Table 1. 2013 Summary statistics (Maine) Item Value U.S. Rank Primary energy source Natural gas Net summer capacity (megawatts) 4,499 43 Electric utilities 14 49 IPP & CHP 4,485 21 Net generation (megawatthours) 14,030,038 44 Electric utilities 597 49 IPP & CHP 14,029,441 25 Emissions Sulfur dioxide (short tons) 13,365 38 Nitrogen oxide (short tons) 9,607 44 Carbon dioxide (thousand metric tons) 3,675 45 Sulfur dioxide (lbs/MWh) 1.9 23 Nitrogen oxide

  3. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Maryland Electricity Profile 2013 Table 1. 2013 Summary statistics (Maryland) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 12,339 33 Electric utilities 85 48 IPP & CHP 12,254 8 Net generation (megawatthours) 35,850,812 37 Electric utilities 30,205 46 IPP & CHP 35,820,607 9 Emissions Sulfur dioxide (short tons) 41,539 26 Nitrogen oxide (short tons) 21,995 34 Carbon dioxide (thousand metric tons) 18,950 34 Sulfur dioxide (lbs/MWh) 2.3 17 Nitrogen oxide

  4. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Massachusetts Electricity Profile 2013 Table 1. 2013 Summary statistics (Massachusetts) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 13,678 32 Electric utilities 969 42 IPP & CHP 12,709 7 Net generation (megawatthours) 32,885,021 40 Electric utilities 611,320 44 IPP & CHP 32,273,700 12 Emissions Sulfur dioxide (short tons) 12,339 40 Nitrogen oxide (short tons) 15,150 41 Carbon dioxide (thousand metric tons) 14,735 38 Sulfur dioxide (lbs/MWh) 0.8 38

  5. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Michigan Electricity Profile 2013 Table 1. 2013 Summary statistics (Michigan) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 30,128 11 Electric utilities 22,148 9 IPP & CHP 7,981 14 Net generation (megawatthours) 105,417,801 14 Electric utilities 83,171,310 13 IPP & CHP 22,246,490 14 Emissions Sulfur dioxide (short tons) 237,091 5 Nitrogen oxide (short tons) 86,058 8 Carbon dioxide (thousand metric tons) 67,193 10 Sulfur dioxide (lbs/MWh) 4.5 3 Nitrogen oxide

  6. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Minnesota Electricity Profile 2013 Table 1. 2013 Summary statistics (Minnesota) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 15,758 26 Electric utilities 11,901 22 IPP & CHP 3,858 25 Net generation (megawatthours) 51,296,988 31 Electric utilities 41,155,904 27 IPP & CHP 10,141,084 30 Emissions Sulfur dioxide (short tons) 35,625 28 Nitrogen oxide (short tons) 36,972 28 Carbon dioxide (thousand metric tons) 29,255 29 Sulfur dioxide (lbs/MWh) 1.4 28 Nitrogen

  7. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Mississippi Electricity Profile 2013 Table 1. 2013 Summary statistics (Mississippi) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 15,561 28 Electric utilities 12,842 20 IPP & CHP 2,719 35 Net generation (megawatthours) 52,810,264 29 Electric utilities 45,413,403 23 IPP & CHP 7,396,861 35 Emissions Sulfur dioxide (short tons) 87,718 17 Nitrogen oxide (short tons) 24,490 32 Carbon dioxide (thousand metric tons) 22,633 33 Sulfur dioxide (lbs/MWh) 3.3 9

  8. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Missouri Electricity Profile 2013 Table 1. 2013 Summary statistics (Missouri) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 21,801 19 Electric utilities 20,562 15 IPP & CHP 1,239 42 Net generation (megawatthours) 91,626,593 17 Electric utilities 89,217,205 10 IPP & CHP 2,409,387 46 Emissions Sulfur dioxide (short tons) 157,488 8 Nitrogen oxide (short tons) 78,033 10 Carbon dioxide (thousand metric tons) 78,344 8 Sulfur dioxide (lbs/MWh) 3.4 8 Nitrogen oxide

  9. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Montana Electricity Profile 2013 Table 1. 2013 Summary statistics (Montana) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 6,329 41 Electric utilities 2,568 38 IPP & CHP 3,761 27 Net generation (megawatthours) 27,687,326 41 Electric utilities 7,361,898 38 IPP & CHP 20,325,428 16 Emissions Sulfur dioxide (short tons) 16,865 36 Nitrogen oxide (short tons) 21,789 35 Carbon dioxide (thousand metric tons) 16,951 35 Sulfur dioxide (lbs/MWh) 1.2 31 Nitrogen oxide

  10. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Nebraska Electricity Profile 2013 Table 1. 2013 Summary statistics (Nebraska) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 8,449 36 Electric utilities 7,911 30 IPP & CHP 538 49 Net generation (megawatthours) 37,104,628 34 Electric utilities 35,170,167 30 IPP & CHP 1,934,461 48 Emissions Sulfur dioxide (short tons) 66,884 22 Nitrogen oxide (short tons) 31,505 29 Carbon dioxide (thousand metric tons) 28,043 32 Sulfur dioxide (lbs/MWh) 3.6 7 Nitrogen oxide

  11. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Nevada Electricity Profile 2013 Table 1. 2013 Summary statistics (Nevada) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 10,652 34 Electric utilities 7,915 29 IPP & CHP 2,737 34 Net generation (megawatthours) 36,443,874 35 Electric utilities 27,888,008 34 IPP & CHP 8,555,866 33 Emissions Sulfur dioxide (short tons) 7,436 41 Nitrogen oxide (short tons) 16,438 39 Carbon dioxide (thousand metric tons) 15,690 37 Sulfur dioxide (lbs/MWh) 0.4 43 Nitrogen

  12. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Hampshire Electricity Profile 2013 Table 1. 2013 Summary statistics (New Hampshire) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 4,413 44 Electric utilities 1,121 41 IPP & CHP 3,292 30 Net generation (megawatthours) 19,778,520 42 Electric utilities 2,266,903 41 IPP & CHP 17,511,617 20 Emissions Sulfur dioxide (short tons) 3,733 44 Nitrogen oxide (short tons) 5,057 47 Carbon dioxide (thousand metric tons) 3,447 46 Sulfur dioxide (lbs/MWh) 0.4 45 Nitrogen

  13. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Jersey Electricity Profile 2013 Table 1. 2013 Summary statistics (New Jersey) Item Value Rank Primary energy source Nuclear Net summer capacity (megawatts) 18,997 22 Electric utilities 544 43 IPP & CHP 18,452 6 Net generation (megawatthours) 64,750,942 24 Electric utilities -122,674 50 IPP & CHP 64,873,616 6 Emissions Sulfur dioxide (short tons) 3,196 46 Nitrogen oxide (short tons) 15,299 40 Carbon dioxide (thousand metric tons) 15,789 36 Sulfur dioxide (lbs/MWh) 0.1 48 Nitrogen oxide

  14. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Mexico Electricity Profile 2013 Table 1. 2013 Summary statistics (New Mexico) Item Value U.S. Rank Primary energy source Coal Net summer capacity (megawatts) 7,938 38 Electric utilities 5,912 33 IPP & CHP 2,026 36 Net generation (megawatthours) 35,870,965 36 Electric utilities 29,833,095 33 IPP & CHP 6,037,870 37 Emissions Sulfur dioxide (short tons) 17,735 34 Nitrogen oxide (short tons) 59,055 16 Carbon dioxide (thousand metric tons) 28,535 31 Sulfur dioxide (lbs/MWh) 1.0 36 Nitrogen

  15. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    York Electricity Profile 2013 Table 1. 2013 Summary statistics (New York) Item Value Rank Primary energy source Natural Gas Net summer capacity (megawatts) 39,918 6 Electric utilities 10,736 26 IPP & CHP 29,182 5 Net generation (megawatthours) 136,116,830 8 Electric utilities 33,860,490 31 IPP & CHP 102,256,340 5 Emissions Sulfur dioxide (short tons) 30,947 29 Nitrogen oxide (short tons) 44,824 24 Carbon dioxide (thousand metric tons) 33,456 26 Sulfur dioxide (lbs/MWh) 0.5 41 Nitrogen

  16. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    North Carolina Electricity Profile 2013 Table 1. 2013 Summary statistics (North Carolina) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 30,048 12 Electric utilities 26,706 6 IPP & CHP 3,342 29 Net generation (megawatthours) 125,936,293 9 Electric utilities 116,317,050 2 IPP & CHP 9,619,243 31 Emissions Sulfur dioxide (short tons) 71,293 20 Nitrogen oxide (short tons) 62,397 12 Carbon dioxide (thousand metric tons) 56,940 14 Sulfur dioxide (lbs/MWh) 1.1 32

  17. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Dakota Electricity Profile 2013 Table 1. 2013 Summary statistics (North Dakota) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 6,566 40 Electric utilities 5,292 34 IPP & CHP 1,274 41 Net generation (megawatthours) 35,021,673 39 Electric utilities 31,044,374 32 IPP & CHP 3,977,299 42 Emissions Sulfur dioxide (short tons) 56,854 23 Nitrogen oxide (short tons) 48,454 22 Carbon dioxide (thousand metric tons) 30,274 28 Sulfur dioxide (lbs/MWh) 3.2 11 Nitrogen oxide

  18. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Ohio Electricity Profile 2013 Table 1. 2013 Summary statistics (Ohio) Item Value Rank Primary energy source Coal Net summer capacity (megawatts) 32,482 8 Electric utilities 20,779 11 IPP & CHP 11,703 9 Net generation (megawatthours) 137,284,189 7 Electric utilities 88,763,825 12 IPP & CHP 48,520,364 7 Emissions Sulfur dioxide (short tons) 346,873 2 Nitrogen oxide (short tons) 102,526 4 Carbon dioxide (thousand metrictons) 102,466 4 Sulfur dioxide (lbs/MWh) 5.1 1 Nitrogen oxide (lbs/MWh)

  19. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Oklahoma Electricity Profile 2013 Table 1. 2013 Summary statistics (Oklahoma) Item Value Rank Primary energy source Natural gas Net summer capacity (megawatts) 23,300 17 Electric utilities 16,951 18 IPP & CHP 6,349 17 Net generation (megawatthours) 73,673,680 22 Electric utilities 53,348,841 18 IPP & CHP 20,324,839 17 Emissions Sulfur dioxide 80,418 19 Nitrogen oxide 57,024 17 Carbon dioxide (thousand metric tons) 46,268 19 Sulfur dioxide (lbs/MWh) 2.2 18 Nitrogen oxide (lbs/MWh) 1.5 19

  20. EIA - State Electricity Profiles

    U.S. Energy Information Administration (EIA) Indexed Site

    Oregon Electricity Profile 2013 Table 1. 2013 Summary statistics (Oregon) Item Value Rank Primary energy source Hydroelectric Net summer capacity (megawatts) 15,662 27 Electric utilities 10,973 25 IPP & CHP 4,689 19 Net generation (megawatthours) 59,895,515 26 Electric utilities 43,254,167 24 IPP & CHP 16,641,348 21 Emissions Sulfur dioxide (short tons) 17,511 35 Nitrogen oxide (short tons) 13,803 42 Carbon dioxide (thousand metric tons) 9,500 40 Sulfur dioxide (lbs/MWh) 0.6 39 Nitrogen