1

Health-hazard evaluation report HETA 83-186-1628, Raytheon Missile Systems Division, Bristol, Tennessee  

SciTech Connect (OSTI)

Environmental and breathing-zone samples were analyzed for cutting-oil mists, metal working fluids, and mineral spirits at Raytheon Missile Systems Divisions, Bristol, Tennessee in July, 1985. The evaluation was requested confidentially to investigate the occurrence of skin rashes in Machine-Department employees.

Salisbury, S.; Lucas, C.

1985-09-01T23:59:59.000Z

2

Tennessee Electrical Contractor Witnesses Stabilization | Department...  

Broader source: Energy.gov (indexed) [DOE]

Tennessee Electrical Contractor Witnesses Stabilization Tennessee Electrical Contractor Witnesses Stabilization April 2, 2010 - 11:31am Addthis Joshua DeLung David Andrews of...

3

Tennessee Valley Electric Coop | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop, Inc Place:Innovation & SolutionsKentucky) Jump to:

4

Tri-State Electric Member Corp (Tennessee) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,LtdInformation DixieTraverse Electric Coop,Trenton,Corp

5

Small Wind Electric Systems: A Guide Produced for the Tennessee Valley Authority (Revised) (Brochure)  

SciTech Connect (OSTI)

Small Wind Electric Systems: A Guide Produced for the Tennessee Valley Authority provides consumers with information to help them determine whether a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include how to make a home more energy efficient, how to choose the correct turbine size, the parts of a wind electric system, how to determine whether enough wind resource exists, how to choose the best site for a turbine, how to connect a system to the utility grid, and whether it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a regional wind resource map and a list of incentives and contacts for more information.

Not Available

2009-06-01T23:59:59.000Z

6

Bristol Bay Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarre BiomassTHISBrickyard Energy PartnersUnitedBristol Bay

7

Bristol Heart Institute issue broken heart  

E-Print Network [OSTI]

Bristol Heart Institute issue Mending a broken heart The energy powerhouse Plaques, cracks and heart attacks re:search University of Bristol · June 2006 #12;BRISTOL HEART INSTITUTE ISSUE · JUNE 2006 THE BRISTOL HEART INSTITUTE 1 C ardiovascular disease is the UK's single biggest killer of both men and women

Bristol, University of

8

EA-1712: Final Environmental Assessment  

Broader source: Energy.gov [DOE]

Exide Technologies Electric Drive Vehicle Battery And Component Manufacturing Initiative Application, Bristol, Tennessee, And Columbus, Georgia

9

Middle Tennessee EMC- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Middle Tennessee Electric Membership Corporation (MTEMC) and the Tennessee Valley Authority (TVA) offer incentives for residential customers through the In-Home Energy Evaluation Program. This...

10

Southwest Tennessee EMC- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Southwest Tennessee Electric Membership Corporation (STEMC), in collaboration with The Tennessee Valley Authority, offers water heater rebates for residential customers. Rebates are available for...

11

Regulations For Gas Companies (Tennessee)  

Broader source: Energy.gov [DOE]

The Regulations for Gas Companies, implemented by the Tennessee Regulatory Authority (Authority) outline the standards for metering, distribution and electricity generation for utilities using gas....

12

City of Bristol, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) Jump to: navigation, search Name: CityBridgeport

13

@BristolUniLib bristol.ac.uk/library Remote (off-site) access  

E-Print Network [OSTI]

Library @BristolUniLib bristol.ac.uk/library Remote (off-site) access As a member of the University network you may use one of the following options to gain network access from off-site: Remote Desktop.bristol.ac.uk/it-services/ advice/homeusers/remote/studentdesktop. Off-site Proxy The off-site proxy allows use of University web

Bristol, University of

14

Bristol County, Rhode Island: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarre BiomassTHISBrickyard Energy PartnersUnitedBristol BayThis

15

East Tennessee State University Johnson City, Tennessee  

E-Print Network [OSTI]

#12;East Tennessee State University Johnson City, Tennessee Vol. XCVI April 2009 No. 10 Johnson City, Tennessee 37614-1707 The 2009-2010 Graduate Catalog of East Tennessee State University (USPS, 807 UNIVERSITY PARKWAY, JOHNSON CITY, TENNESSEE 37601. Periodicals postage paid at Johnson City

Karsai, Istvan

16

Tennessee Air Quality Act (Tennessee)  

Broader source: Energy.gov [DOE]

The Tennessee Air Quality Act (AQA) delegates the power to maintain air quality in the State to the Department of Environment and Conservation. Under the Department of the Environment and...

17

Clean Tennessee Energy Grant Program (Tennessee)  

Broader source: Energy.gov [DOE]

The purpose of the Clean Tennessee Energy Grant Program is to select and fund projects that best result in a reduction of emissions and pollutants identified below. The Clean Tennessee Energy...

18

Tennessee Energy Statistics Quarterly. Second quarter 1984  

SciTech Connect (OSTI)

The Tennessee Energy Statistics Quarterly presents the most current energy statistics available which are specific to the State of Tennessee. In every instance possible, county-level energy data are also shown. The report covers three substantive areas of the energy flow production, consumption, and pricing. The specific energy types for which data are included are coal, petroleum, natural gas and electricity. The Tennessee Energy Statistics Quarterly has been developed by the Tennessee Energy Data Base Program to serve as a supplement to the Energy Division publication - The Tennessee Energy Profiles: 1960-1980. Historical data reported in this volume cover the production and utilization of major energy supplies by fuel type and economic sectors, as well as other energy data such as prices and fuel distribution. 12 figures, 12 tables.

Finley, T.F. III; Hensley, B.D.; Trotter, T.

1985-01-01T23:59:59.000Z

19

Waterbird and Food Resource Responses to Winter Drawdown in the east Tennessee River Valley  

E-Print Network [OSTI]

Tennessee Douglas Reservoir * ** * Study Sites Near Confluence of the... French Broad River Nolichucky River Electricity Generation Cool Nuclear Reactors Predictable Hydrology Historically, reservoir downdowns began Rankin Bottoms WMA East Tennessee Douglas Reservoir * ** * Study Sites Near Confluence of the... French

Gray, Matthew

20

Bristol, Vermont: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Area SolarConnecticut:659243° Loading map...UtilitiesBristol is a

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Media Summary 16-22 August 2014 UWE Bristol News  

E-Print Network [OSTI]

Bristol researchers amongst world's leading scientific minds Coverage 3D Print.com - Scientists in England 3D Print BioSensor That Can Immediately Tell If Water Is Clean Eastbourne Hearld ­ A Golden

Aickelin, Uwe

22

Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study  

SciTech Connect (OSTI)

The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNCs technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clarks Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clarks Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

Vaught, Douglas J.

2007-03-31T23:59:59.000Z

23

Tennessee Water Resources Information Act (Tennessee)  

Broader source: Energy.gov [DOE]

The Tennessee Water Resources Information Act is designed to prevent the lowering of the ground water table by requiring that adequate information is obtained to document current demand for water...

24

Weekly Media Summary from the Media Relations team 5 17 April 2014 UWE Bristol News  

E-Print Network [OSTI]

, Bedminster, Bristol, to be launched on Saturday Machinery Market - Ceramic 3-D printing on The Gadget Show

Aickelin, Uwe

25

CORPORATIONS APAC Tennessee Incorporated  

E-Print Network [OSTI]

Services Deal Cooper Holton PLLC Design Details A.C.A.P. - The Care Foundation Devault Interactive Deweese of Jacksonville Inc. FedEx Corporation First South Financial Credit Union First Tennessee Bank First Tennessee and Music Publishing LLC Macmillan Subscription Services Magnolia Processing Inc Mr. Chris Marable Marsh

Dasgupta, Dipankar

26

Kentucky & Tennessee TOBACCOProduction Guide  

E-Print Network [OSTI]

2011-2012 Kentucky & Tennessee TOBACCOProduction Guide ID-160 F KENTUCKY COLLEGE OF AGRICULTURE. University of Kentucky Authors Kenny Seebold, Editor Department of Plant Pathology Bob Pearce, Co of Biosystems and Agricultural Engineering 2011-2012 Kentucky & Tennessee TOBACCO Production Guide University

Tennessee, University of

27

bristol.ac.uk/studybristol.ac.uk/study Bristol has been named the best UK city to live in.  

E-Print Network [OSTI]

and ride, you could visit The Mall before heading home. A green city Bristol has been awarded European Green Capital for 2015. As well as the Downs ­ Clifton Down and Durdham Down, two large historic green city-centre accommodation. The Grade II-listed converted tea warehouse contains five exhibition spaces

Bristol, University of

28

Forestry Policies (Tennessee)  

Broader source: Energy.gov [DOE]

Tennessee's forests are managed by the Department of Agriculture, Forestry Division. In 2010 the Division issued its Statewide Forest Action Plan, which includes a section detailing the bio-energy...

29

Tennessee Small Business Investment Company Credit Act (Tennessee)  

Broader source: Energy.gov [DOE]

The Tennessee Small Business Company Credit Act offers $120 million in gross premiums tax credits to insurance companies that invest in companies certified by the State of Tennessee as TNInvestcos....

30

Tennessee: Tennessee's Clean Energy Resources and Economy (Brochure)  

SciTech Connect (OSTI)

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Tennessee.

Not Available

2013-03-01T23:59:59.000Z

31

UWE Bristol News and Media Coverage w/c 22 April 2013 Press Releases  

E-Print Network [OSTI]

://info.uwe.ac.uk/news/UWENews/news.aspx?id=2530 UWE Bristol student wins E.ON Engineering Undergraduate of the Year Award http

Aickelin, Uwe

32

bristol.ac.uk/studybristol.ac.uk/study The best way to get a taste  

E-Print Network [OSTI]

home. A green city Bristol has been awarded European Green Capital for 2015. As well as the Downs ­ Clifton Down and Durdham Down, two large historic green spaces of about 400 acres ­ Bristol has more than-listed converted tea warehouse contains five exhibition spaces, a café bar and one of the country's best arts

Bristol, University of

33

Bristol, New Hampshire: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Area SolarConnecticut:659243° Loading map...Utilities JumpBristol

34

Gibson Electric Membership Corporation- Energy Efficiency Rebates  

Broader source: Energy.gov [DOE]

Gibson Electric Membership Corporation, in collaboration with the Tennessee Valley Authority, promotes energy efficient building design through its [http://www.energyright.com/ ''energy right'']...

35

Tennessee Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Tennessee nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

36

Purchased Gas Adjustment Rules (Tennessee)  

Broader source: Energy.gov [DOE]

The Purchased Gas Adjustment Rules are implemented by the Tennessee Regulatory Authority (Authority). Purchased Gas Adjustment (PGA) Rules are intended to permit the company/LDC (local gas...

37

University of Tennessee Institute of Agriculture Tennessee Watershed  

E-Print Network [OSTI]

.state.tn.us/environment/wpc/wshed1.htm Watts Bar Watershed McMinn Monroe Pond Creek #12;University of Tennessee Institute of Agriculture Water Quality in Pond Creek 35.6 miles of Mud Creek, Greasy Branch and Pond Creek listed on 2002? #12;University of Tennessee Institute of Agriculture Pond Creek · Pasture based beef and dairy

38

Contact Undergraduate Admissions Office | Tel +44 (0)117 928 8154 Email socsci-ug-admissions@bristol.ac.uk 54 ACCOUnTing And FinAnCE  

E-Print Network [OSTI]

-ug-admissions@bristol.ac.uk 54 ACCOUnTing And FinAnCE FACULTY oF soCiAL sCienCes And LAw bristol.ac.uk Accounting and Finance As one of the UK's leading departments for Accounting and Finance, we offer you the opportunity to study and their application skills. bristol.ac.uk/accounting Why study Accounting and Finance at Bristol? Bristol has

Subramanian, Sriram

39

Type B Accident Investigation of the April 8, 2003, Electrical Arc Blast at the Foster Wheeler Environmental Corporation TRU Waste Processing Facility, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

At approximately 0330 hours on April 8, 2003, a phase-to-phase arc blast occurred in the boiler electrical control panel at the Foster Wheeler Environmental Corporation (FWENC) Transuranic (TRU) Waste Processing Facility. The boiler was providing steam for the evaporator and was reportedly operating at about 10% of its capacity.

40

Kentucky & Tennessee TOBACCOProduc tion Guide  

E-Print Network [OSTI]

2009-2010 Kentucky & Tennessee TOBACCOProduc tion Guide ID-160 F KENTUCKY COLLEGE OF AGRICULTURE. University of Kentucky Authors Kenny Seebold, Editor Department of Plant Pathology Bob Pearce, Co of Biosystems and Agricultural Engineering 2009-2010 Kentucky & Tennessee TOBACCO Produc tion Guide University

Tennessee, University of

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

University of Tennessee | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,Save Energy NowNew Hampshire Address Chase OceanTennessee Address

42

Tennessee Natural Gas Summary  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousandProcessed (Million Cubic Feet) Tennessee3 4.35

43

Retrofitting the Tennessee Valley Authority  

E-Print Network [OSTI]

As the flagship of the New Deal, the Tennessee Valley Authority (TVA) was a triumph of regional and environmental design that has since fallen on hard times. When writer James Agee toured the region in 1935, he described ...

Zeiber, Kristen (Kristen Ann)

2013-01-01T23:59:59.000Z

44

Regulatory Facility Guide for Tennessee  

SciTech Connect (OSTI)

This guide provides detailed compilations of international, federal, and state transportation related regulations applicable to shipments originating at or destined to Tennessee facilities. Information on preferred routes is also given.

Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O. [Oak Ridge National Lab., TN (United States); Rymer, A.C. [Transportation Consulting Services, Knoxville, TN (United States)

1994-02-28T23:59:59.000Z

45

Oil and Gas Program (Tennessee)  

Broader source: Energy.gov [DOE]

The Oil and Gas section of the Tennessee Code, found in Title 60, covers all regulations, licenses, permits, and laws related to the production of natural gas. The laws create the Oil and Gas...

46

Cookeville Electric Department- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Cookeville Electric Department, in collaboration with the Tennessee Valley Authority, offers an incentive for residential customers to install energy efficient equipment through the ''energy right'...

47

Cherokee Electric Cooperative- Residential Energy Efficiency Loan Programs  

Broader source: Energy.gov [DOE]

Cherokee Electric Coop offers loans to residential customers for making energy efficiency improvements. In association with the Tennessee Valley Authority (TVA), the Energy Right program offers...

48

Safety Assessment & Certification for UAS Bristol UAV Systems Conference April 2007  

E-Print Network [OSTI]

Safety Assessment & Certification for UAS 22nd Bristol UAV Systems Conference ­ April 2007 SAFETY process to gain clearance to operate in unsegregated airspace, new UASs will require a robust Safety Assessment process. The authors have looked at the civil manned aircraft safety assessment process defined

Nicholson, Mark

49

Age of Pre-late-Wisconsin Glacial-Estuarine Sedimentation, Bristol Bay, Alaska  

E-Print Network [OSTI]

stimu- lated and thermoluminescence (IRSL and TL) techniques. Analy- sis of modern and 14 C-dated of northeastern Bristol Bay, southwestern Alaska, was dated using a variety of approaches, including infrared techniques. IRSL seems to be especially well suited for dating, with resolution on time scales of

Ingólfsson, ?lafur

50

Vertebrates from the Late Triassic Thecodontosaurus-bearing rocks of Durdham Down, Clifton (Bristol, UK)  

E-Print Network [OSTI]

vertebrate faunas from these fissure fills have been found in many limestone quarries of the area, some-bearing rocks, collected in the 1830s from the quarries at Durdham Down, and can therefore for the first time Down (Bristol, UK) has not been investigated, largely because the quarries are built over. Other

Benton, Michael

51

Department of Nuclear Engineering The University of Tennessee  

E-Print Network [OSTI]

#12;Department of Nuclear Engineering The University of Tennessee Knoxville, Tennessee Twenty ............................................................14 Nuclear Engineering Student Awards and Honors...................................................20 of the University of Tennessee Nuclear Engineering Department (UTNE) is intended to serve as a State

Tennessee, University of

52

Knoxville, Tennessee: Solar in Action (Brochure), Solar America...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Knoxville, Tennessee: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Knoxville, Tennessee: Solar in Action (Brochure), Solar America...

53

Tennessee Pollution Prevention Partnership | Y-12 National Security...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tennessee Pollution ... Tennessee Pollution Prevention Partnership Posted: February 14, 2013 - 9:58am The green flag belongs to every Y-12 employee who has collected cans for...

54

CX: Categorical Determination-Alcoa Tennessee Automotive Sheet...  

Broader source: Energy.gov (indexed) [DOE]

CX: Categorical Determination-Alcoa Tennessee Automotive Sheet Expansion Project CX: Categorical Determination-Alcoa Tennessee Automotive Sheet Expansion Project Categorical...

55

STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF RADIOLOGICAL HEALTH L&C ANNEX - THIRD FLOOR 401 CHURCH STREET NASHVILLE, TENNESSEE 37243-1532 LICENSEE: Babcock &...

56

Tennessee Veterans Business Association 3rd Annual Business and...  

Broader source: Energy.gov (indexed) [DOE]

Tennessee Veterans Business Association 3rd Annual Business and Education Showcase Tennessee Veterans Business Association 3rd Annual Business and Education Showcase January 28,...

57

Department of Nuclear Engineering The University of Tennessee  

E-Print Network [OSTI]

#12;Department of Nuclear Engineering The University of Tennessee Knoxville, Tennessee Twenty ........................................................................................................................ 19 NUCLEAR ENGINEERING UNDERGRADUATE STUDENT SCHOLARSHIPS..........................................................................................................................3 GRADUATE STUDENT THESES, ENGINEERING PRACTICE PROJECTS, AND DISSERTATION TOPICS

Tennessee, University of

58

Atomic Energy and Nuclear Materials Program (Tennessee)  

Broader source: Energy.gov [DOE]

The Atomic Energy and Nuclear Materials section of the Tennessee Code covers all of the regulations, licenses, permits, siting requirements, and practices relevant to a nuclear energy development. ...

59

East Tennessee State University Web Privacy Statement  

E-Print Network [OSTI]

East Tennessee State University Web Privacy Statement A Note to Children and Parents East Tennessee through a university Web site is handled. ETSU understands the importance of protecting the privacy of personal information, especially in today's electronic environment. This privacy policy covers the Web

Karsai, Istvan

60

University of Tennessee Nuclear Engineering Department  

E-Print Network [OSTI]

1 University of Tennessee Nuclear Engineering Department Strategic Plan Update (2009...................................................................................... 12 #12;3 STRATEGIC PLAN NUCLEAR ENGINEERING DEPARTMENT UNIVERSITY OF TENNESSEE (December 2009) 1 and Traditional Nuclear Engineering). The department reported $1.4 million in sponsored research expenditures

Tennessee, University of

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Meigs County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey,(MonasterLowellisMcDonald is aElectricMeeme,MeetsolarTennessee. Its FIPS

62

Tennessee Natural Gas Processed in Tennessee (Million Cubic Feet)  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousandProcessed (Million Cubic Feet) Tennessee Naturalin

63

Bristol Bay Borough, Alaska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarre BiomassTHISBrickyard Energy PartnersUnited

64

ELECTRIC  

Office of Legacy Management (LM)

you nay give us will be greatly uppreckted. VPry truly your23, 9. IX. Sin0j3, Mtinager lclectronics and Nuclear Physics Dept. omh , WESTINGHOUSE-THE NAT KING IN ELECTRICITY...

65

Covanta Bristol Energy Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) |Cordova Electric633211°,of ForestBabylon Energy

66

Underground Coal Gasification at Tennessee Colony  

E-Print Network [OSTI]

The Tennessee Colony In Situ Coal Gasification Project conducted by Basic Resources Inc. is the most recent step in Texas Utilities Company's ongoing research into the utilization of Texas lignite. The project, an application of the Soviet...

Garrard, C. W.

1979-01-01T23:59:59.000Z

67

Tennessee  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1. 111.1Donald L.

68

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

moved to establish an integrated and coordinated policy and administrative system for the management of Tennessee Tennessee is fortunate to have what many consider to be an abundant and good quality water supply to the management and monitoring of water resources. In recent years, however, the State, through the Tennessee

69

The Tennessee Wetlands Conservation Strategy, first published in  

E-Print Network [OSTI]

3 #12;PREFACE The Tennessee Wetlands Conservation Strategy, first published in February 1994, and actions to better understand and conserve Tennessee's wetlands resources. This is the third edition goals for the upcoming years. The development of a Wetlands Strategy in Tennessee began in the fall

Gray, Matthew

70

Infection and Immunity in Bristol is a core research theme, boasting an exceptional track record in clinical  

E-Print Network [OSTI]

of the art research facilities, along with colleagues in local NHS trusts and the Health Protection Agency and international charities and industry. Our latest report (2009-2011) indicated that I&I attracted £14 million investment. Our know-how in managing the academic-commercial interface, means that Bristol I&I can meet

Bristol, University of

71

University of Bristol IT Services document its-t4sm-2 T4 Site Manager for website  

E-Print Network [OSTI]

University of Bristol IT Services document its-t4sm-2 T4 Site Manager for website moderators, type the document code given in brackets at the top of this page. Related documentation Site Manager Document information Task 1 Overview of the Site Manager Moderator interface

Bristol, University of

72

bristol.ac.uk/cabot Implications for the UK nuclear industry of the events at the Fukushima  

E-Print Network [OSTI]

bristol.ac.uk/cabot Implications for the UK nuclear industry of the events at the Fukushima Dai of the events at the Fukushima Dai- ichi nuclear power station, Japan. The report draws on expertise at the Fukushima Daiichi Nuclear Power Plant (NPP), which has recently been declared a level 7 accident within

Bristol, University of

73

EA-1175: Proposed Title Transfer of East Tennessee Technology Park Land and Facilities, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposal to transfer the title of unneeded DOE real property located at the U.S. Department of Energy East Tennessee Technology Park (ETTP) in...

74

System Description for the K-25/K-27 D&D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Foam Delivery System used in the decontamination and decommissioning (D&D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer{reg_sign} H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001.

Boris, G.

2008-02-21T23:59:59.000Z

75

UNIVERSITY OF TENNESSEE COLLEGE OF MEDICINE  

E-Print Network [OSTI]

UNIVERSITY OF TENNESSEE COLLEGE OF MEDICINE Technical Standards for Admissions, Retention by the simultaneous acquisition of skills and professional attitudes and behavior. Our faculty has the responsibility-solving and diagnosis, the critical skills demanded of physicians, require all of these intellectual abilities

Cui, Yan

76

The University of Tennessee LAW WOMEN CONSTITUTION  

E-Print Network [OSTI]

The University of Tennessee LAW WOMEN CONSTITUTION MISSION STATEMENT The Mission Statement for Law community. Law Women strives to: · Raise awareness of issues related to women's participation community that address issues of concern to women. MEMBERSHIP, OFFICERS, & COMMITTEES 1. Law Women

Tennessee, University of

77

Secretary Chu, NNSA Administrator and the Tennessee Congressional...  

Energy Savers [EERE]

Congressional Delegation Join Local Officials in Dedicating Highly Enriched Uranium Materials Facility at Y-12 Secretary Chu, NNSA Administrator and the Tennessee Congressional...

78

Energy Secretary to Visit Georgia Nuclear Reactor Site and Tennessee...  

Energy Savers [EERE]

Energy Secretary to Visit Georgia Nuclear Reactor Site and Tennessee Laboratory to Highlight Administration Support for Nuclear Energy Energy Secretary to Visit Georgia Nuclear...

79

ORNL to Host Tennessee Solar Initiative  

E-Print Network [OSTI]

#12;ORNL to Host Tennessee· Solar Initiative Two Energy Frontier Research· Centers at ORNL Senate each of energy's "10 Big Problems." Our strategy is grounded in the belief that no single technology Energy Chair Visits ORNL· V o l . 4 2 , N o . 2 , 2 0 0 9 c o n t e n t s e d i t o r i a l 1 Solving

80

East Tennessee Technology Park | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit| Department of EnergyProgramMeeting atofEast Tennessee Technology

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Deep Residential Retrofits in East Tennessee  

SciTech Connect (OSTI)

Executive Summary Oak Ridge National Laboratory (ORNL) is furthering residential energy retrofit research in the mixed-humid climate of East Tennessee by selecting 10 homes and guiding the homeowners in the energy retrofit process. The homeowners pay for the retrofits, and ORNL advises which retrofits to complete and collects post-retrofit data. This effort is in accordance with the Department of Energy s Building America program research goal of demonstrating market-ready energy retrofit packages that reduce home energy use by 30 50%. Through this research, ORNL researchers hope to understand why homeowners decide to partake in energy retrofits, the payback of home energy retrofits, and which retrofit packages most economically reduce energy use. Homeowner interviews help the researchers understand the homeowners experience. Information gathered during the interviews will aid in extending market penetration of home energy retrofits by helping researchers and the retrofit industry understand what drives homeowners in making positive decisions regarding these retrofits. This report summarizes the selection process, the pre-retrofit condition, the recommended retrofits, the actual cost of the retrofits (when available), and an estimated energy savings of the retrofit package using EnergyGauge . Of the 10 households selected to participate in the study, only five completed the recommended retrofits, three completed at least one but no more than three of the recommended retrofits, and two households did not complete any of the recommended retrofits. In the case of the two homes that did none of the recommended work, the pre-retrofit condition of the homes and the recommended retrofits are reported. The five homes that completed the recommended retrofits are monitored for energy consumption of the whole house, appliances, space conditioning equipment, water heater, and most of the other circuits with miscellaneous electric loads (MELs) and lighting. Thermal comfort is also monitored, with temperature and humidity measured in all conditioned zones, attics, crawlspaces, and unconditioned basements. In some homes, heat flux transducers are installed on the basement walls to help determine the insulating qualities of the technologies and practices. EnergyGauge is used to estimate the pre-retrofit and post-retrofit home energy rating system (HERS) index and reduction in energy consumption and energy bill. In a follow-up report, data from the installed sensors will be presented and analyzed as well as a comparison of the post-retrofit energy consumption of the home to the EnergyGauge model of the post-retrofit home. Table ES1 shows the retrofits that were completed at the eight households where some or all of the recommended retrofits were completed. Home aliases are used to keep the homeowners anonymous. Some key findings of this study thus far are listed as follows. Some homeowners (50%) are not willing to spend the money to reach 30 50% energy savings. Quality of retrofit work is significantly variable among contractors which impact the potential energy savings of the retrofit. Challenges exist in defining house volume and floor area. Of the five homes that completed all the recommended retrofits, energy bill savings was not the main driver for energy retrofits. In no case were the retrofits cost neutral given a 15 year loan at 7% interest for the retrofit costs.

Boudreaux, Philip R [ORNL; Hendrick, Timothy P [ORNL; Christian, Jeffrey E [ORNL; Jackson, Roderick K [ORNL

2012-04-01T23:59:59.000Z

82

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

to face severe water shortage problems. All across the state many private, domestic, and commercial useTennessee Water Resources Research Center Annual Technical Report FY 2011 Tennessee Water Resources Research Center Annual Technical Report FY 2011 1 #12;Introduction Introduction Water Resources Issues

83

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

to face severe water shortage problems. All across the state many private, domestic, and commercial useTennessee Water Resources Research Center Annual Technical Report FY 2009 Tennessee Water Resources Research Center Annual Technical Report FY 2009 1 #12;Introduction Water Resources Issues and Problems

84

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

to face severe water shortage problems. All across the state many private, domestic, and commercial useTennessee Water Resources Research Center Annual Technical Report FY 2012 Tennessee Water Resources Research Center Annual Technical Report FY 2012 1 #12;Introduction Introduction Water Resources Issues

85

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

tributaries for their water sources continue to face severe water shortage problems. All across the state manyTennessee Water Resources Research Center Annual Technical Report FY 2007 Tennessee Water Resources Research Center Annual Technical Report FY 2007 1 #12;Introduction Water Resources Issues and Problems

86

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

continue to face severe water shortage problems. All across the state many private, domesticTennessee Water Resources Research Center Annual Technical Report FY 2013 Tennessee Water Resources Research Center Annual Technical Report FY 2013 1 #12;Introduction Introduction Water Resources Issues

87

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

to face severe water shortage problems. All across the state many private, domestic, and commercial useTennessee Water Resources Research Center Annual Technical Report FY 2010 Tennessee Water Resources Research Center Annual Technical Report FY 2010 1 #12;Introduction Introduction Water Resources Issues

88

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

tributaries for their water sources continue to face severe water shortage problems. All across the state manyTennessee Water Resources Research Center Annual Technical Report FY 2000 Introduction Tennessee Water Resources Research Center Annual Technical Report FY 2000 Introduction Water Resources Issues

89

East Tennessee State University TBR Strategic Planning 2005-2010  

E-Print Network [OSTI]

East Tennessee State University TBR Strategic Planning 2005-2010 GOAL 1. LEADERSHIP LEADERSHIP Planning Priority. The Tennessee Board of Regents System will provide leadership in promoting educational toward enhancing workforce development, · commitment to civic involvement that builds on a history

Karsai, Istvan

90

Tennessee Water Resources Research Center Annual Technical Report  

E-Print Network [OSTI]

and administrative system for the management of water resources in Tennessee. While the situation is improving to be an abundant and good quality water supply. Historically, federal government agencies, such as the Tennessee, have been the primary contributors to the management and monitoring of water resources. In recent years

91

South Kentucky Rural Electric Coop Corp (Tennessee) | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar PowerstoriesNrelPartnerTypePonsa,HomeIndiana:Rhode Island References: EIA

92

Tennessee Natural Gas Deliveries to Electric Power Consumers (Million Cubic  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved ReservesFeet)per Thousand Cubic4,630.2 10,037.24. U.S.Year Jan FebYearFeet)

93

Tennessee Natural Gas Deliveries to Electric Power Consumers (Million Cubic  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousand CubicinResidualU.S.contains

94

Nutrient Management Issues inNutrient Management Issues in TennesseeTennessee  

E-Print Network [OSTI]

9 large CAFOsCAFOs permittedpermitted All swineAll swine 136 medium136 medium CAFOs issued by Dept. of EnvironmentPermits issued by Dept. of Environment and Conservation (TDEC and enforcementenforcement www.state.tn.us/environment/permits/cafo.htmwww.state.tn.us/environment/permits/cafo.htm Tennessee

95

EA-1640: Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

DOEs Oak Ridge Operations Office issued a final EA and a finding of no significant impact for a proposal to convey DOE property located at the East Tennessee Technology Park and the surrounding area to the Community Reuse Organization of East Tennessee, City of Oak Ridge, other agencies, or private entities for mixed use economic development.Public Comment Opportunities.

96

Tennessee Natural Gas Processed (Million Cubic Feet)  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousandProcessed (Million Cubic Feet) Tennessee Natural

97

Tennessee State Historic Preservation Programmatic Agreement | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesignOffice -Template for aof Energy Tennessee

98

Tennessee/Incentives | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark Jump to: navigation,TelluricTODO:Tennessee 2 Rules,

99

Tullahoma, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark JumpDetective:Toyo AluminiumCityTullahoma, Tennessee: Energy

100

East Tennessee Technology Park | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday, Septemberof EnergyMEast Tennessee

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Saulsbury, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginiaRooseveltVISanton GmbH JumpSatconSaulsbury, Tennessee: Energy

102

Sandia National Laboratories: Tennessee Valley Authority  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErikGroundbreakingStandardsTCES Sandia Researchers WinTVA ConsortiumTennessee

103

Alternative Fuels Data Center: Tennessee Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuelsPropane Tank OverfillSan DiegoBiodieselTennessee

104

Tennessee/Wind Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump to:TaosISGANAttribution(Alabama)Tennessee/Wind Resources <

105

Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump to:TaosISGANAttribution(Alabama)Tennessee/Wind Resources

106

Clean Cities: Middle Tennessee Clean Fuels coalition  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center Home PageEmerging FuelsRelated4 VehicleGeneseeIowaMiddle Tennessee

107

Organisation of the Adaptive Computing in Design and Manufacture 2004 Conference. April 20-22, 2004, Engineers House, Clifton, Bristol, UK.  

E-Print Network [OSTI]

, Engineers House, Clifton, Bristol, UK. GENETIC PROGRAMMING WITHIN CIVIL ENGINEERING David Shaw1 , John Miles or real number strings. · Active vs Passive: Because GP usually evolves computer programs, the solutions binary strings i.e. passive structures, which require post-processing. · Variable vs fixed length

Fernandez, Thomas

108

Talking Small Business in Knoxville, Tennessee | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Talking Small Business in Knoxville, Tennessee July 18, 2012 - 2:11pm Addthis Dot Harris speaking live to WBIR, a local Knoxville television station, the morning of the Energy...

109

Tennessee-based IAC Helps Manufacturer Become More Energy Efficient  

Office of Energy Efficiency and Renewable Energy (EERE)

Thanks to help from the Tennessee 3-Star Industrial Assessment Center, the FUJIFILM Hunt Chemicals U.S.A facility in Dayton, TN is saving an estimated $39,280 per year in energy savings. Find out more.

110

The Rural Opportunity Initiative Enhanced Job Tax Credit (Tennessee)  

Broader source: Energy.gov [DOE]

The Rural Opportunity Initiative Enhanced Job Tax Credit program provides enhanced job tax credits to businesses locating or expanding in certain Tennessee counties considered Tier 2 or Tier 3...

111

INDEPENDENT VERIFICATION SURVEY REPORT FOR ZONE 1 OF THE EAST TENNESSEE TECHNOLOGY PARK IN OAK RIDGE, TENNESSEE  

SciTech Connect (OSTI)

Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

King, David A.

2012-08-16T23:59:59.000Z

112

Real-Time Pricing- A Flexible Alternative for Electrical Power Supply  

E-Print Network [OSTI]

REAL-TIME PRICING - A FLEXIBLE ALTERNATIVE ..OR ELECTRICAL POWER SUPPLY S. D. REYNOLDS Manager of Industrial Marketing & Services Tennessee Valley Authority Chattanooga, Tennessee ABSTRACT In an increasingly competitive operating... environment, utilities must place greater emphasis on developing programs that benefit the customer while at the same time benefiting the utility. Economy Surplus Power (ESP) is such a program. ESP offers industrial customers attractively priced power...

Reynolds, S. D.; Frye, A. O. Jr.

113

Independent Oversight Inspection, East Tennessee Technology Park, Summary Report- May 2003  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park

114

Recommendation 170: Remedial Investigation/Feasibility Study for East Tennessee Technology Park  

Broader source: Energy.gov [DOE]

The ORSSAB Recommendation to DOE on a Remedial Investigation/Feasibility Study for East Tennessee Technology Park.

115

Shiprock case study 1986 annual DOE Remedial Action Programs meeting, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document contains primarily reproductions of slides presented at the 1986 Annual Doe Remedial Action Programs Meeting, Oak Ridge, Tennessee.

Themelis, J.; Baker, K.; Meyer, R.; Thiers, J.

1986-12-31T23:59:59.000Z

116

THE FISHES OF KENTUCKY AND TENNESSEE: A DISTRIBU. TIONAL CATALOGUE OF THE KNOWN SPECIES  

E-Print Network [OSTI]

THE FISHES OF KENTUCKY AND TENNESSEE: A DISTRIBU. TIONAL CATALOGUE OF THE KNOWN SPECIES By Barton page retained for pagination #12;THE FISHES OF KENTUCKY AND TENNESSEE: A DISTRIBUTIONAL CATALOGUE of Kentucky and Tennessee. It is believed they will prove of particular value to those interested in questions

117

Tennessee Valley and Eastern Kentucky Wind Working Group  

SciTech Connect (OSTI)

In December 2009, the Southern Alliance for Clean Energy (SACE), through a partnership with the Appalachian Regional Commission, EKPC, Kentucky's Department for Energy Development and Independence, SACE, Tennessee's Department of Environment and Conservation, and TVA, and through a contract with the Department of Energy, established the Tennessee Valley and Eastern Kentucky Wind Working Group (TVEKWWG). TVEKWWG consists of a strong network of people and organizations. Working together, they provide information to various organizations and stakeholders regarding the responsible development of wind power in the state. Members include representatives from utility interests, state and federal agencies, economic development organizations, non-government organizations, local decision makers, educational institutions, and wind industry representatives. The working group is facilitated by the Southern Alliance for Clean Energy. TVEKWWG supports the Department of Energy by helping educate and inform key stakeholders about wind energy in the state of Tennessee.

Katie Stokes

2012-05-03T23:59:59.000Z

118

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Bui

Rigsby V.P.

2009-02-12T23:59:59.000Z

119

THE UNIVERSITY OF TENNESSEE KNOXVILLE COLLEGE OF SOCIAL WORK  

E-Print Network [OSTI]

300-471 E. Quiz on Diffusion of Innovation 5 Quiz F. Organizational social context of services 6THE UNIVERSITY OF TENNESSEE ­ KNOXVILLE COLLEGE OF SOCIAL WORK Social Work 613 - Spring 2014 Charles Glisson Social Work Practice and Its Social Context II 124 Henson Hall Credit Hours: 3 974-0840 I

Grissino-Mayer, Henri D.

120

University of Tennessee Health Science Center History and Archive  

E-Print Network [OSTI]

University of Tennessee Health Science Center History and Archive Inventory by Series This is a file folder inventory of the material accessioned by the History and Archive Committee. The material department, and then by box and folder number. All the the records in this database have been sorted

Cui, Yan

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

SAIC

2011-04-01T23:59:59.000Z

122

EA-2000: Proposed Land Transfer to Develop a General Aviation Airport at the East Tennessee Technology Park Heritage Center, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

DOE is preparing an EA to assess potential environmental impacts of the proposed land transfer to the Metropolitan Knoxville Airport Authority for the development of a general aviation airport at the East Tennessee Technology Park Heritage Center, in Oak Ridge, Tennessee. Public Comment Opportunities None available at this time. Documents Available for Download No downloads found for this office.

123

Tennessee Valley Authority (Kentucky) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop, Inc Place:Innovation & SolutionsKentucky) Jump to: navigation,

124

Solar heating system installed at Jackson, Tennessee. Final report  

SciTech Connect (OSTI)

The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

None

1980-10-01T23:59:59.000Z

125

Obion County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company)ReferencesNuiqsut,Place,Oakmont,Obion County, Tennessee: Energy

126

Morgan County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate ZoneMontrose, Wisconsin:MorelandBethany,Tennessee: Energy

127

Tennessee Eastman letter on Y-12 reduction in force  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security AdministrationcontrollerNanocrystallineForeignTechnology-Selection-ProcessHigh-RateofTennessee Eastman

128

Tennessee Pollution Prevention Partnership | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security AdministrationcontrollerNanocrystallineForeignTechnology-Selection-ProcessHigh-RateofTennessee

129

Maury County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey,(MonasterLowellis aMaury County, Tennessee: Energy Resources Jump to:

130

Williamson County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative JumpWilliamson County, Tennessee: Energy Resources Jump to: navigation,

131

Wilson County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative JumpWilliamson County, Tennessee:Willowick,North Carolina:

132

City of Brownsville, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) Jump to: navigation, search Name:Brookings,Tennessee

133

City of Covington, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) Jump to:Chicopee,Colman Place:Cornell,CouleeTennessee

134

City of Dyersburg, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) JumpDoerun, Georgia (UtilityDyersburg Place: Tennessee

135

City of Lewisburg, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (UtilityHolyrood, KansasLampasas, Texas (UtilityLeesburg,Tennessee

136

City of Lexington, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (UtilityHolyrood, KansasLampasas, TexasLexington Place: Tennessee

137

City of Springfield, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhioOglesby, IllinoisSchulenburg,Spencer Place: NebraskaTennessee References:

138

City of Union City, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhioOglesby,Sullivan, Missouri (UtilityUnion City Place: Tennessee

139

Adams, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskeyEnergyAd-Venta Jump to:Colorado:01. It isis a5822667°,

140

Adamsville, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskeyEnergyAd-Venta Jump to:Colorado:01.Adamsville

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Alamo, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergy InformationTuri BiomassWheeler County, Georgia. It7847949°,

142

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 1999  

SciTech Connect (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 1999. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 199a). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 1999, these CY 1999 goals were extended to CY 2000 for all waste streams that generated waste in 1999. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 51 waste streams met or exceeded their reduction goal based on the CY 1999 data.

Bechtel Jacobs Company LLC

2000-03-01T23:59:59.000Z

143

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 2000  

SciTech Connect (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 2000. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 2000). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 2000, these goals were extended to CY 2001 for all waste streams that generated waste in 2000. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 50 waste streams met or exceeded their reduction goal based on the CY 2000 data.

Bechtel Jacobs Company LLC

2001-03-01T23:59:59.000Z

144

John T. Mihalczo PhD. in Nuclear Engineering : University of Tennessee, 1970  

E-Print Network [OSTI]

John T. Mihalczo PhD. in Nuclear Engineering : University of Tennessee, 1970 Masters in Physics in Nuclear Engineering at the University of Tennessee, Knoxville in 1970. · 40 years experience in measurements with fissile materials. · Fellow of American Nuclear Society. Recent work in Arms Control

145

212 PHYSICS EDUCATION The editor welcomes letters, by e-mail to ped@iop.org or by post to Dirac House, Temple Back, Bristol BS1 6BE, UK.  

E-Print Network [OSTI]

). Everyday words (uphill energy, motion energy) were introduced as substitutes for established terms, but new to Dirac House, Temple Back, Bristol BS1 6BE, UK. March 2004 A trial of two energies One controversy above Nuffield-inspired imaginative physics teaching also led to what has been described as the `kinetic energy

Planin?iè, Gorazd

146

Electricity Advisory Committee  

Broader source: Energy.gov (indexed) [DOE]

Tennessee Valley Authority Gordon van Welie Independent System Operator of New England (ISO NE) The Honorable Rebecca Wagner Nevada Public Utilities Commission Mike Weedall...

147

Coffee County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin: Energy, -105.3774934°Coda Battery Systems JumpCoeurTennessee.

148

DeKalb County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump to:52c8ff988c1 No38e4011f618b No revisionDeFrees Flume 2 JumpDeKalbTennessee.

149

Tennessee Natural Gas Residential Consumption (Million Cubic Feet)  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousandProcessed (Million Cubic Feet) Tennessee

150

Tennessee Natural Gas Underground Storage Capacity (Million Cubic Feet)  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousandProcessed (Million Cubic Feet) Tennessee3

151

Tennessee Natural Gas Underground Storage Net Withdrawals (Million Cubic  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousandProcessed (Million Cubic Feet) Tennessee3Feet)

152

Union County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UC 19-6-401 et seq.North Carolina: EnergyTennessee: Energy

153

Van Buren County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UCOpen Energy Information Valley ViewTennessee: Energy

154

Wayne County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDSWawarsing, New York: Energy2479453°,Tennessee: Energy

155

Tennessee/Wind Resources/Full Version | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark Jump to: navigation,TelluricTODO:Tennessee 2

156

DOE - Office of Legacy Management -- Tennessee Valley Authority - AL 01  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site - MO 02SuttonTennessee Valley

157

Tennessee - Compare - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1. 111.1Donald L.Tennessee

158

Tennessee - Search - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1. 111.1DonaldTennessee

159

McMinn County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey,(MonasterLowellisMcDonald is a borough in91.McMinn County, Tennessee:

160

White County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative Jump to:Westview, Florida:WheatleyWheeler,Georgia: EnergyTennessee:

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Tennessee Regions | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadoreConnecticutPhotos of AECSign Up for E-mailScienceTennessee Regions

162

Campbell County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBostonFacility | Open Energy Information Hot SpringsTennessee. Its

163

Cheatham County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Information on PV2009Information17. ItCheatham County, Tennessee:

164

City of Murfreesboro, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:Energy Nebraska (UtilityGeorgia (Utility Company) JumpMurfreesboro, Tennessee

165

Indoor nitrogen dioxide in five Chattangooga, Tennessee public housing developments  

SciTech Connect (OSTI)

This report summarizes an indoor nitrogen dioxide (NO{sub 2}) sampling study conducted during January through March of 1987 in five Chattanooga public housing developments. The origins of this study date to the summer of 1983 when the Piney Woods Community Organization (a citizens action group) expressed concern about toxic industrial air pollution and the effects it might have on their community. In response to these concerns, the Chattanooga-Hamilton County Air Pollution Control Bureau (Bureau) requested assistance from the Tennessee Department of Health and Environment (TDHE) in conducting a community health survey and assistance from the Tennessee Valley Authority (TVA) in conducting a community air quality measurement program. The TDHE community health study did not find any significant differences between the mortality statistics for the Piney Woods community and a demographically similar control group. However, a health survey revealed that Piney Woods residents did not have a statistically significant higher self-reported prevalence of cough, wheezing, phlegm, breathlessness, colds, and respiratory illness.

Parkhurst, W.J.; Harper, J.P. (Tennessee Valley Authority (US)); Spengler, J.D.; Fraumeni, L.P.; Majahad, A.M. (Harvard School of Public Health, Boston, MA (US)); Cropp, J.W. (Chattanooga-Hamilton County Air Pollution Control Bureau, Chattanooga, TN (US))

1988-01-01T23:59:59.000Z

166

Preterites and past participles in the Tennessee Civil War Veterans Questionnaires  

E-Print Network [OSTI]

, isolated area comprised of these physiographic regions, the Unaka Mountains and the Great Valley of East Tennessee, and the Cumberland Plateau. These regions are merely subregions of the Appalachian Mountain Range which extends from New England... extractive industries such as mining and lumbering were brought to the area. Directly west of the Unaka Mountains i s the Great Valley of East Tennessee. This region i s the main agricultural sector of East Tennessee due to i t s more f e r t i l e soils...

Abney, Lisa Jo

1988-01-01T23:59:59.000Z

167

Race, Place, and Family: Narratives of the Civil Rights Movement in Brownsville, Tennessee, and the Nation  

E-Print Network [OSTI]

This dissertation examines the Civil Rights Movement through the experiences of primarily two African American families with roots in Brownsville, Tennessee. This study, based on archival research and oral histories, ...

Bond, Jo Zanice

2011-12-31T23:59:59.000Z

168

An economic analysis of a monitored retrievable storage site for Tennessee. Final report and appendices  

SciTech Connect (OSTI)

The United States Department of Energy is charged with the task of identifying potential sites for a Monitored Retrievable Storage (MRS) Facility and reporting the results of its analysis to Congress by January 1986. DOE chose three finalist sites from 11 sites DOE analysts evaluated earlier. All three are in Tennessee, including two in Oak Ridge and one in Trousdale/Smith Counties. This paper is a summary of research undertaken on the economic effects of establishing the MRS facility in Tennessee. All three locations were considered in the analysis, but on some occasions attention is focused on the site preferred by DOE. The research was undertaken by the Center for Business and Economic Research (CBER), College of Business Administration, the University of Tennessee, Knoxville, under contract with the Tennessee Department of Economic and Community Development.

Fox, W.F.; Mayo, J.W.; Hansen, L.T.; Quindry, K.E.

1985-12-17T23:59:59.000Z

169

An economic analysis of a monitored retrievable storage site for Tennessee  

SciTech Connect (OSTI)

The United States Department of Energy is charged with the task of identifying potential sites for a Monitored Retrievable Storage (MRS) Facility and reporting the results of its analysis to Congress by January 1986. DOE chose three finalist sites from 11 sites DOE analysts evaluated earlier. All three are in Tennessee, including two in Oak Ridge and one in Trousdale/Smith Counties. This paper is a summary of research undertaken on the economic effects of establishing the MRS facility in Tennessee. All three locations were considered in the analysis, but on some occasions attention is focused on the site preferred by DOE. The research was undertaken by the Center for Business and Economic Research (CBER), College of Business Administration, the University of Tennessee, Knoxville, under contract with the Tennessee Department of Economic and Community Development.

Fox, W.F.; Mayo, J.W.; Hansen, L.T.; Quindry, K.E.

1985-12-17T23:59:59.000Z

170

Tennessee: Da Vinci Fuel-in-Oil Reduces Emissions, Wins R&D 100...  

Energy Savers [EERE]

Da Vinci Fuel-in-Oil Reduces Emissions, Wins R&D 100 Award Tennessee: Da Vinci Fuel-in-Oil Reduces Emissions, Wins R&D 100 Award August 19, 2013 - 5:07pm Addthis Developed jointly...

171

Harnessing Energy Savings in Tennessee: Weatherization Assistance Close-Up Fact Sheet  

SciTech Connect (OSTI)

Tennessee demonstrates its commitment to technology and efficiency through the Weatherization Program. Weatherization uses advanced technologies and techniques to reduce energy costs for low-income families by increasing the energy efficiency of their homes.

D& R International

2001-10-10T23:59:59.000Z

172

UTNEUPDATEUTNEUPDATEA Publication from the Department of Nuclear Engineering at the University of Tennessee Continues Nuclear  

E-Print Network [OSTI]

UTNEUPDATEUTNEUPDATEA Publication from the Department of Nuclear Engineering at the University of Tennessee FALL 2014 UCOR Continues Nuclear Engineering Support Sam Donnald and Nathan Capps Outstanding NE Engineering Achieves Major Advances in Enrollment, Research, and Recognition UT Nuclear Engineering Achieves

Tennessee, University of

173

Factors influencing participation in craft organizations: a study of East Tennessee craftspeople and their organizations  

E-Print Network [OSTI]

FACTORS INFLUENCING PARTICIPATION IN CRAFT ORGANIZATIONS: A STUDY OF EAST TENNESSEE CRAFTSPEOPLE AND THEIR ORGANIZATIONS A Thesis by PHILLIP MYRL MONK Submitted to the Graduate College of Texas A&M University in partial fulfillment.... of the requirement for the degree of MASTER OF SCIENCE December 1977 Major Subject: Sociology FACTORS INFLUENCING PARTICIPATION IN CRAFT ORGANIZATIONS: A STUDY OF EAST TENNESSEE CRAFTSPEOPLE AND THEIR OGRANIZATIONS A Thesis by PHILLIP MYRL MONK Approved...

Monk, Phillip Myrl

1977-01-01T23:59:59.000Z

174

Fiscal year 1993 well plugging and abandonment program, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from December 1992 through August 20, 1993. A total of 70 wells and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the US Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

Not Available

1993-09-01T23:59:59.000Z

175

Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee  

SciTech Connect (OSTI)

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).

Bechtel Jacobs, Raymer J.E.

2008-06-12T23:59:59.000Z

176

Wildfire Risk Assessment and Community Wildfire Protection in the Chilhowee Mountain Area of Blount County, East Tennessee.  

E-Print Network [OSTI]

??The growing Wildland Urban Interface community in the Chilhowee Mountain area of Blount County, Tennessee, like many other forested areas in the mountains and hills (more)

Chimchome, Piyarat

2008-01-01T23:59:59.000Z

177

Colloid-facilitated transport of radium and thorium in the Memphis Aquifer, Memphis, Tennessee, U.S.A.  

E-Print Network [OSTI]

??The significance of groundwater colloidal transport was examined in the context of the Memphis Aquifer (Memphis, Tennessee) in the vicinity of the Sheahan well field. (more)

Todd, Vincent Michael

2013-01-01T23:59:59.000Z

178

Baseline Environmental Analysis Report for the K-1251 Barge Facility at the East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-1251 Barge Facility, which is located at the East Tennessee Technology Park (ETTP). DOE is proposing to lease the facility to the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the use, by a potential lessee, of government-owned facilities at ETTP. This report is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The lease footprint is slightly over 1 acre. The majority of the lease footprint is defined by a perimeter fence that surrounds a gravel-covered area with a small concrete pad within it. Also included is a gravel drive with locked gates at each end that extends on the east side to South First Avenue, providing access to the facility. The facility is located along the Clinch River and an inlet of the river that forms its southern boundary. To the east, west, and north, the lease footprint is surrounded by DOE property. Preparation of this report included the review of government records, title documents, historic aerial photos, visual and physical inspections of the property and adjacent properties, and interviews with current and former employees involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products or their derivatives and acutely hazardous wastes were known to have been released or disposed. Radiological surveys were conducted and chemical samples were collected to assess the facility's condition.

Van Winkle J.E.

2007-08-24T23:59:59.000Z

179

AVTA: 2010 Electric Vehicles International Neighborhood Electric...  

Energy Savers [EERE]

10 Electric Vehicles International Neighborhood Electric Vehicle Testing Results AVTA: 2010 Electric Vehicles International Neighborhood Electric Vehicle Testing Results The...

180

Electricity Reliability  

E-Print Network [OSTI]

Electricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization in the future because they have virtually no resistance to electric current, offering the possibility of new electric power equipment with more energy efficiency and higher capacity than today's systems

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Tennessee Natural Gas Price Sold to Electric Power Consumers (Dollars per  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved ReservesFeet)per Thousand Cubic4,630.2 10,037.24. (Million CubicLiquids

182

Tennessee Natural Gas Price Sold to Electric Power Consumers (Dollars per  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYear Jan FebThousand

183

11-0187 E11-7015-00-014-11 1M 4/10 http://middletennessee.tennessee.edu  

E-Print Network [OSTI]

Conditioner, Giles County Joey and Gail Chessor, Grinder's Switch Winery, Hickman County Dan and Debbie Eiser, Blueberries on the Buffalo, Lawrence County Representatives from three agricultural enterprises and Tractor-Mounted Sprayers White Pine, Tennessee Riverbend Nurseries Thompsons Station, Tennessee Tri

Dai, Pengcheng

184

Landfarming of municipal sewage sludge at Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The City of Oak Ridge, Tennessee, has been applying municipal sanitary sludge to 9 sites comprising 90 ha on the US Department of Energy (DOE) Oak Ridge Reservation (ORR) since 1983. Approximately 13,000,000 L are applied annually by spraying sludge (2 to 3% solids) under pressure from a tanker. Under an ongoing monitoring program, both the sludge and the soil in the application areas are analyzed for organic, inorganic, and radioactive parameters on a regular basis. Organic pollutants are analyzed in sludge on a semiannual basis and in the soil application areas on an annual basis. Inorganic parameters are analyzed daily (e.g., pH, total solids) or monthly (e.g., nitrogen, manganese) in sludge and annually in soil in application areas. Radionuclides (Co-60, Cs-137, I-131, Be-7, K-40, Ra-228, U-235, U-238) are scanned daily during application by the sewage treatment plant and analyzed weekly in composite sludge samples and annually in soil. Additionally, data on radioactive body burden for maximally exposed workers who apply the sludge show no detectable exposures. This monitoring program is comprehensive and is one of the few in the United States that analyzes radionuclides. Results from the monitoring program show heavy metals and radionuclides are not accumulating to levels in the soil application areas.

Tischler, M.L.; Pergler, C.; Wilson, M.; Mabry, D.; Stephenson, M.

1995-12-01T23:59:59.000Z

185

Environmental Compliance and Protection Program Description Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

Bechtel Jacobs

2009-02-26T23:59:59.000Z

186

Tennessee Oversight Agreement annual report, May 31, 1994--June 30, 1995  

SciTech Connect (OSTI)

The Tennessee Department of Environment and Conservation`s DOE Oversight Division (TDEC/DOE-O) is responsible for assuring the citizens of Tennessee that their health, safety and environment on the Oak Ridge Reservation are protected and that appropriate remedial action is taken to provide this protection. TDEC/DOE-O has five program sections that reflect the organizational structure of the TDEC Bureau of Environment Divisions, as well as DOE`s Environmental Safety and Health, Waste Management, and Environmental Restoration Programs.

NONE

1995-09-01T23:59:59.000Z

187

A comparison of Tennessee Williams' Summer and smoke and The eccentricities of a nightingale  

E-Print Network [OSTI]

of MASTER OF ARTS May 197B Major Subject: English A COMPARISON OF TENNESSEE WILLIAMS' SUMMER AND SMOKE AND THE ECCENTRICITIES OF A NIGHTINGALE A Thesi s by SHIRLEY LOIS BOYD Approved as to style and content by: g'~t. &i7 'i IL. Chairman of Commi... tte j H ad o Depar tment Member Member May 1978 442842 ABSTRACT A Comparison of Tennessee Williensf Summer and Smoke d 7' E t ' t' f ~N' tt' 1 (N 7 19791 S hi rl ey Loi s Boyd, B. S. N. 7 Mary ? Hardin-Baylor College; Chairman of Advi sory...

Boyd, Shirley Lois

1978-01-01T23:59:59.000Z

188

Central Electric Coop. Oregon Trail Electric Coop. Douglas Electric  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Electric Coop. Oregon Trail Electric Coop. Douglas Electric Coop. Blachly- Lane Co. Coop Umatilla Electric Coop. Hermiston Milton- Freewater Idaho Co Light & Power Coop....

189

Electrical Engineer  

Broader source: Energy.gov [DOE]

This position is located in the Office of Electric Reliability. The Office of Electric Reliability helps protect and improve the reliability and security of the nation's bulk power system through...

190

Type B Accident Investigation, Subcontractor Employee Personal Protective Equipment Ignition Incident on February 18, 2003, at the East Tennessee Technology Park, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

On February 18, 2003, a general laborer employed at the East Tennessee Technology Park (ETTP) by MACTEC Constructors, Inc. (MACTEC) was performing rebar removal with a gas-powered cut-off machine. MACTEC is a subcontractor to Bechtel Jacobs Company LL (BJC). The sparks from the cut-off machine ignited the right leg of his 100% cotton anticontamination (anti-c) coveralls and the plastic bootie.

191

Petrophysical properties of saprolites from the Oak Ridge Integrated Field Research Challenge site, Tennessee  

E-Print Network [OSTI]

Petrophysical properties of saprolites from the Oak Ridge Integrated Field Research Challenge site Karaoulis2 ABSTRACT At the Oak Ridge Integrated Field Research Challenge site, near Oak Ridge, Tennessee methods have been used to locate contami- nant migration at the Oak Ridge Integrated Field Research Chal

Hubbard, Susan

192

DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park  

Broader source: Energy.gov [DOE]

Oak Ridge, Tenn. As part of its ongoing commitment to cleaning up the legacy of the Cold War at sites across the weapons complex, the U.S. Department of Energy has awarded a contract for the remaining environmental cleanup at the East Tennessee Technology Park (ETTP) to URS | CH2M Oak Ridge, LLC.

193

City of Knoxville, Tennessee City Council Resolution for solar PV system  

Office of Energy Efficiency and Renewable Energy (EERE)

This document is a scan of the resolution, dated July 26, 2011, for the approval of the City of Knoxville, Tennessee to use $250,000 of EECBG funding for finding innovative financing mechanisms for a planned installation of a 90-kW solar PV system.

194

Proceedings of the 2013 Joint Rail Conference April 15-18, 2013, Knoxville, Tennessee, USA  

E-Print Network [OSTI]

American operating environment differs than the operating practices found throughout much of the rest freight and intercity passenger traffic. One of the challenges created by this operating environmentProceedings of the 2013 Joint Rail Conference JRC2013 April 15-18, 2013, Knoxville, Tennessee, USA

Barkan, Christopher P.L.

195

Geoarchaeological Investigation of the Coats-Hines Site (40WM31), Williamson County, Tennessee  

E-Print Network [OSTI]

The Coats-Hines site (40WM31) is a potential pre-Clovis site located in Franklin, Tennessee. The site rests, geographically, at the convergence of the Central Basin and Western Highland Rim. The site was discovered during the construction of a...

Schmalle, Kayla Anne

2013-07-24T23:59:59.000Z

196

Transportation impacts on the Tennessee highway system proposed monitored retrievable storage. Final report  

SciTech Connect (OSTI)

The issue of the transport of spent fuels to the proposed monitored retrievable storage facility in Tennessee is discussed. Relevant issues include the ability of the roads and bridges on the transport routes to handle the weight of the trucks. (CBS)

Cobble, C.

1985-12-12T23:59:59.000Z

197

Transportation impacts on the Tennessee highway system proposed monitored retrievable storage  

SciTech Connect (OSTI)

The issue of the transport of spent fuels to the proposed monitored retrievable storage facility in Tennessee is discussed. Relevant issues include the ability of the roads and bridges on the transport routes to handle the weight of the trucks. (CBS)

Cobble, C.

1985-12-12T23:59:59.000Z

198

From the Desk of the Executive Chancellor The University of Tennessee Health Science Center is  

E-Print Network [OSTI]

career is essential to successful planning. An integrated plan can serve as a disciplinary tool to helpFrom the Desk of the Executive Chancellor The University of Tennessee Health Science Center as relevant as possible to the faculty, staff, and students of the Health Science Cen- ter, your help

Cui, Yan

199

Jose March-Leuba Ph.D. in Nuclear Engineering: University of Tennessee, 1984  

E-Print Network [OSTI]

Jose March-Leuba Ph.D. in Nuclear Engineering: University of Tennessee, 1984 M. S. in nuclear Program Committee. Dr. March-Leuba also serves as reviewer for Nuclear Science and Engineering, #12;Nuclear Engineering and Design, Nuclear Technology and as a member of the Technical Program Committees

200

Fault Diagnosis with Bayesian Networks: Application to the Tennessee Eastman Process  

E-Print Network [OSTI]

Fault Diagnosis with Bayesian Networks: Application to the Tennessee Eastman Process Sylvain VERRON is to present and evaluate the performance of a new procedure for industrial process diagnosis. This method are not very efficient in the space described by all variables of the process, an identification of impor- tant

Paris-Sud XI, Universit de

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

City of Memphis, Tennessee (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreisVolcanic NationalElectric) Jump to: navigation,Jumpand

202

Electric vehicles  

SciTech Connect (OSTI)

Quiet, clean, and efficient, electric vehicles (EVs) may someday become a practical mode of transportation for the general public. Electric vehicles can provide many advantages for the nation's environment and energy supply because they run on electricity, which can be produced from many sources of energy such as coal, natural gas, uranium, and hydropower. These vehicles offer fuel versatility to the transportation sector, which depends almost solely on oil for its energy needs. Electric vehicles are any mode of transportation operated by a motor that receives electricity from a battery or fuel cell. EVs come in all shapes and sizes and may be used for different tasks. Some EVs are small and simple, such as golf carts and electric wheel chairs. Others are larger and more complex, such as automobile and vans. Some EVs, such as fork lifts, are used in industries. In this fact sheet, we will discuss mostly automobiles and vans. There are also variations on electric vehicles, such as hybrid vehicles and solar-powered vehicles. Hybrid vehicles use electricity as their primary source of energy, however, they also use a backup source of energy, such as gasoline, methanol or ethanol. Solar-powered vehicles are electric vehicles that use photovoltaic cells (cells that convert solar energy to electricity) rather than utility-supplied electricity to recharge the batteries. This paper discusses these concepts.

Not Available

1990-03-01T23:59:59.000Z

203

EA-1113: Lease of Parcel ED-1 of the Oak Ridge Reservation By The East Tennessee Council  

Broader source: Energy.gov [DOE]

This EA evaluates the potential environmental impacts associated with the proposed lease of 957.16 acres of the Oak Ridge Reservation to the East Tennessee Economic Council (ETEC). ETEC proposes ...

204

Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee  

SciTech Connect (OSTI)

Conduct verification surveys of available grids at the DWI 1630 in Knoxville, Tennessee. A representative with the Independent Environmental Assessment and Verification (IEAV) team from ORISE conducted a verification survey of a partial area within Grid E9.

P.C. Weaver

2008-06-12T23:59:59.000Z

205

EA-1113: Lease of Parcel ED-1 of the Oak Ridge Reservation By The East Tennessee Economic Council  

Broader source: Energy.gov [DOE]

Lease of Parcel ED-1 of the Oak Ridge Reservation By The East Tennessee Economic Council This EA evaluates the potential environmental impacts for the proposed lease of 957.16 acres of the Oak Ridge Reservation to the East Tennessee Economic Council. ETEC proposes to develop an industrial park on the leased site to provide employment opportunities for DOE and contractor employees affected by decreased federal funding.

206

Electric Vehicles  

ScienceCinema (OSTI)

Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

Ozpineci, Burak

2014-07-23T23:59:59.000Z

207

Electric Vehicles  

SciTech Connect (OSTI)

Burak Ozpineci sees a future where electric vehicles charge while we drive them down the road, thanks in part to research under way at ORNL.

Ozpineci, Burak

2014-05-02T23:59:59.000Z

208

Ch 16 Electric Charge &Ch 16. Electric Charge & Electric Field  

E-Print Network [OSTI]

Ch 16 Electric Charge &Ch 16. Electric Charge & Electric Field Liu UCD Phy1B 2012 #12;I Basic ConceptsI. Basic Concepts Static electricity: charges at rest Electric charge Like charges repel Unlike charges attract Liu UCD Phy1B 2012 #12;Electric ChargeElectric Charge Electron charge: -eElectron charge

Yoo, S. J. Ben

209

Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe the RAs performed in Zone 2. The Zone 2 ROD divided the Zone 2 area into 7 geographic areas and 44 EUs. To facilitate the DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was executed and completed in FY 2007 for the 11 EUs addressed in this document. The main body of this report describes both the DVS process and scope of work performed and the RAs completed. The scope and approach for performing DVS activities performed in FY 2007 that lead to action/no further action decisions are presented in Sects. 2 through 4. RAs performed in FY 2007 are presented in Sects. 5 through 10. Future land use is described in Sect. 11, and the status of all Zone 2 EUs as of this PCCR is presented in Sect. 12.

RSI

2008-03-01T23:59:59.000Z

210

Electric machine  

DOE Patents [OSTI]

An interior permanent magnet electric machine is disclosed. The interior permanent magnet electric machine comprises a rotor comprising a plurality of radially placed magnets each having a proximal end and a distal end, wherein each magnet comprises a plurality of magnetic segments and at least one magnetic segment towards the distal end comprises a high resistivity magnetic material.

El-Refaie, Ayman Mohamed Fawzi (Niskayuna, NY); Reddy, Patel Bhageerath (Madison, WI)

2012-07-17T23:59:59.000Z

211

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likel

Bechtel Jacobs

2008-09-11T23:59:59.000Z

212

World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181  

SciTech Connect (OSTI)

On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

Haynes, Ray; Hirschy, Anita [URS - CH2M Oak Ridge, LLC (UCOR), East Tennessee Technology Park D and D and Environmental Remediation Project, Oak Ridge, Tennessee 37830 (United States)] [URS - CH2M Oak Ridge, LLC (UCOR), East Tennessee Technology Park D and D and Environmental Remediation Project, Oak Ridge, Tennessee 37830 (United States)

2013-07-01T23:59:59.000Z

213

Nuclear criticality safety program at the University of Tennessee-Knoxville  

SciTech Connect (OSTI)

This paper presents an overview of the nuclear criticality safety (NCS) educational program at the University of Tennessee-Knoxville. The program is an academic specialization for nuclear engineering graduate students pursuing either the MS or PhD degree and includes special NCS courses and NCS research projects. Both the courses and the research projects serve as partial fulfillment of the requirements for the degree being pursued.

Basoglu, B.; Bentley, C.; Brewer, R.; Dunn, M.; Haught, C.; Plaster, M.; Wilkinson, A.; Dodds, H. (Univ. of Tennessee, Knoxville, TN (United States)); Elliott, E.; Waddell, W. (Martin Marietta Energy Systems Inc., Oak Ridge, TN (United States))

1993-01-01T23:59:59.000Z

214

Electrical connector  

DOE Patents [OSTI]

An electrical connector includes a female component having one or more receptacles, a first test receptacle, and a second test receptacle. The electrical connector also includes a male component having one or more terminals configured to engage the one or more receptacles, a first test pin configured to engage the first test receptacle, and a second test pin configured to engage the second test receptacle. The first test receptacle is electrically connected to the second test receptacle, and at least one of the first test pin and the second test pin is shorter in length than the one or more terminals.

Dilliner, Jennifer L.; Baker, Thomas M.; Akasam, Sivaprasad; Hoff, Brian D.

2006-11-21T23:59:59.000Z

215

Engineering Electrical &  

E-Print Network [OSTI]

Computer Engineering Electrical & Electronic Engineering Mechatronics Engineering Mechanical Engineering Civil Engineering Natural Resources Engineering Forest Engineering Chemical & Process Engineering ELECTIVE 2 Required Engineering Intermediate Year 2011 Eight Required Courses Chart: 120 points College

Hickman, Mark

216

Engineering Electrical &  

E-Print Network [OSTI]

Computer Engineering Electrical & Electronic Engineering Mechatronics Engineering Mechanical Engineering Civil Engineering Natural Resources Engineering Forest Engineering Chemical & Process Engineering ELECTIVE 2 Required Engineering Intermediate Year 2012 Eight Required Courses Chart: 120 points College

Hickman, Mark

217

Environmental Baseline Survey Report for the Title Transfer of Parcel ED-9 at the East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.

SAIC

2010-05-01T23:59:59.000Z

218

Phased Construction Completion Report for Building K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

Garland S.

2008-03-01T23:59:59.000Z

219

Phased Construction Completion Report for Bldg. K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

Bechtel Jacobs

2008-10-01T23:59:59.000Z

220

Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009  

SciTech Connect (OSTI)

The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are included in the proposed ED-8 transfer. The buildings in ED-8 have already been transferred (Buildings K-1007, K-1580, K-1330, and K-1000). These buildings are not included in the transfer footprint of Land Parcel ED-8. A number of temporary structures, such as trailers and tents (non-real property), are located within the footprint. These temporary structures are not included in the transfer. DOE would continue to be responsible for any contamination resulting from DOE activities that is present on the property at the time of transfer but found after the date of transfer. The deed transferring the Property contains various restrictions and prohibitions on the use of the Property that are subject to enforcement pursuant to State Law Tennessee Code Annotated (T.C.A.) 68-212-225 and state real property law. These restrictions and prohibitions are designed to ensure protection of human health and the environment.

SAIC

2009-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Renewable Energy Opportunities at Fort Campbell, Tennessee/Kentucky  

SciTech Connect (OSTI)

This document provides an overview of renewable resource potential at Fort Campbell, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Campbell took place on June 10, 2010.

Hand, James R.; Horner, Jacob A.; Kora, Angela R.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

2011-03-31T23:59:59.000Z

222

Southwest Tennessee E M C | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop, Inc Place: Missouri References: EIA Form EIA-861 FinalE PSouthwest

223

Tri-County Elec Member Corp (Tennessee) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,LtdInformation DixieTraverse Electric Coop,Trenton,

224

Alternative Fuels Data Center: Idle Reduction Programs at Tennessee Schools  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUCProductstwrmrAreSmartWayElectricity Fuel BasicsProduction andConserve FuelIdle

225

Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

Not Available

1990-08-01T23:59:59.000Z

226

PRELIMINARY SURVEY OF WESTINGHOUSE ELECTRIC CORPORATION EAST...  

Office of Legacy Management (LM)

EAST PITTSBURGH, PENNSYLVANIA Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL...

227

Electrical hazards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutronEnvironmentZIRKLEEFFECTS OFElaineElectric826Lab Electrical6,

228

ELECTRICAL & INFORMATION  

E-Print Network [OSTI]

focuses on. Smart Grids: Electricity networks are designed to transport energy from where of energy and smarter management of the system. These are called Smart Grids. A number of research projects in medical informatics, smart cities, mining, energy, financial systems, etc. Bioinformatics

Wagner, Stephan

229

Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.

Bechtel Jacobs

2011-02-01T23:59:59.000Z

230

Engineering Evaluation Report on K-311-1 Floor Subsidence (2008 Annual Report) at the East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The purpose of this task is to evaluate the effect of floor settlement on building structure, piping, and equipment foundations between column lines 1 and 2 and B and K of Bldg. K-311-1 (see Fig. A-1 in Appendix A) at East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee. Revision 0 of this document covers the 2005 annual inspection. Revision 1 addresses the 2006 annual inspection, Revision 2 addresses the 2007 annual inspection, and Revision 3 covers the 2008 annual inspection, as indicated by the changed report title. A civil survey and visual inspection were performed. Only a representative number of points were measured during the 2008 survey. The exact location of a number of survey points in Table A-1 could not be accurately determined in the 2008 survey since these points had not been spray painted since 2003. The points measured are deemed adequate to support the conclusions of this report. Based on the survey and observations, there has been no appreciable change in the condition of the unit since the 2007 inspection. The subsidence of the floor presents concerns to the building structure due to the possible indeterminate load on the pipe gallery framing. Prior to demolition activities that involve the piping or removal of the equipment, such as vent, purge and drain and foaming, engineering involvement in the planning is necessary. The piping connected to the equipment is under stress, and actions should be implemented to relieve this stress prior to disturbing any of the equipment or associated piping. In addition, the load on the pipe gallery framing needs to be relieved prior to any activities taking place in the pipe gallery. Access to this area and the pipe gallery is not allowed until the stress is released.

Knott R.B.

2008-11-13T23:59:59.000Z

231

Escape into illusions of the South in characters of Tennessee Williams  

E-Print Network [OSTI]

, agressive man with a boominS voice who was happiest 'play- ing poker with men and drinkinS. t"5 The short one-act play, The Last of ~? Sol 1d Sold Watches ( 1946 ), reflects Williams' early memor1es of his father a. s a tr, velinS salesman. When... to lean on and litt]e 1n the present. A society oictured as grand, proud, and honorable stands ausinst a new world of lessened values 1n Tennessee Williams ' play called The Last of ~Y Sol1d Gold Watches (i946), . HA=I IE: Huh I Deb eri o. -t ion...

Van Nieuwenhuize, Paul Franklin

1963-01-01T23:59:59.000Z

232

Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation`s supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington.

NONE

1997-07-01T23:59:59.000Z

233

Letter Report - Verification Survey of Final Grids at the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee  

SciTech Connect (OSTI)

Conduct verification surveys of grids at the DWI 1630 Site in Knoxville, Tennessee. The independent verification team (IVT) from ORISE, conducted verification activities in whole and partial grids, as completed by BJC. ORISE site activities included gamma surface scans and soil sampling within 33 grids; G11 through G14; H11 through H15; X14, X15, X19, and X21; J13 through J15 and J17 through J21; K7 through K9 and K13 through K15; L13 through L15; and M14 through M16

P.C. Weaver

2009-02-17T23:59:59.000Z

234

LABORATORY II ELECTRIC FIELDS AND ELECTRIC POTENTIALS  

E-Print Network [OSTI]

Lab II - 1 LABORATORY II ELECTRIC FIELDS AND ELECTRIC POTENTIALS In this lab you will continue to investigate the abstract concept of electric field. If you know the electric field at a point in space, you). With this simulation you can construct a complicated charge configuration and read out the resulting electric field

Minnesota, University of

235

Electrical and Computer Engineering Electrical Engineering  

E-Print Network [OSTI]

Electrical and Computer Engineering Electrical Engineering Department Website: www.iit.edu/engineering/ece Electrical engineering is concerned with the generation, transmission, and utilization of electrical energy and with the transmitting and processing of information. Electrical engineers are involved in the analysis, design, and pro

Heller, Barbara

236

Electrical Safety Committee Charter  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ANL Electrical Safety Page DOE Electrical Safety Handbook General Statement Home & Office Equipment Statement APS Electrical Safety Update Guidelines for Working on Voltages < 240...

237

High Temperatures & Electricity Demand  

E-Print Network [OSTI]

High Temperatures & Electricity Demand An Assessment of Supply Adequacy in California Trends.......................................................................................................1 HIGH TEMPERATURES AND ELECTRICITY DEMAND.....................................................................................................................7 SECTION I: HIGH TEMPERATURES AND ELECTRICITY DEMAND ..........................9 BACKGROUND

238

Raft River Rural Electric Coop. Vigilante Electric Coop. Northern  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Farmers Electric Riverside Electric Minidoka Soda Springs Idaho Falls Lower Valley Energy Lost River Electric Coop. Fall River Rural Electric Coop. Salmon River Electric...

239

Illinois Municipal Electric Agency- Electric Efficiency Program  

Broader source: Energy.gov [DOE]

The Illinois Municipal Electric Agency (IMEA) offers rebates to member municipal utilities* (those who purchase wholesale electric service from IMEA) and retail customers for energy efficiency...

240

Tennessee health studies agreement. Annual report for year 4, January 1--December 31, 1995  

SciTech Connect (OSTI)

The Tennessee Department of Health (TDH) has completed the fourth full year of the Oak Ridge Health Studies Agreement grant. This report summarizes the accomplishments and concerns of the State for the period January 1, 1995, to December 31, 1995. The focus of work during the fourth grant year was the actual work on the dose reconstruction. The final work plan for Task 5, Plan to Perform a Systematic Document Search was received in November 1994. Final work plans for Task 1, Investigation of Radioiodine from Radioactive Lanthanum Processing; Task 2, Investigation of Mercury Releases from Lithium Enrichment; Task 3, Investigation of Releases of PCBs from Oak Ridge Facilities; and Task 4, Investigation of Releases of Radionuclides from White Oak Creek to the Clinch River, were received in February 1995. Final work plans for Task 6, Investigation of the Quality of Historical Uranium Effluent Monitoring at Oak Ridge Facilities; and Task 7, Additional Screening of Materials Not Evaluated in the Dose Reconstruction Feasibility Study, were received in April 1995. ChemRisk`s 4th Quarterly Report, for October through December 1995, is included in Attachment 1. Attachment 2 contains a study which developed a quality improvement program for data imported to the Tennessee Cancer Reporting System and Birth Defects Verification Program.

NONE

1996-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test Final Report  

SciTech Connect (OSTI)

The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL; Capps, Gary J [ORNL; Siekmann, Adam [ORNL

2011-05-01T23:59:59.000Z

242

Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

NONE

1994-09-01T23:59:59.000Z

243

Reservoir monitoring: 1990 summary of vital signs and use impairment monitoring on Tennessee Valley Reservoirs  

SciTech Connect (OSTI)

The Tennessee Valley Authority (TVA) initiated a Reservoir Monitoring Program on 12 TVA reservoirs (the nine main stream Tennessee river reservoirs -- Kentucky through Fort Loudoun and three major tributary storage reservoirs -- Cherokee, Douglas, and Norris) in autumn 1989. The objective of the Reservoir Monitoring Program is to provide basic information on the ``health`` or integrity of the aquatic ecosystem in each TVA reservoir (``Vital Signs``) and to provide screening level information for describing how well each reservoir meets the swimmable and fishable goals of the Clean Water Act (Use Impairments). This is the first time in the history of the agency that a commitment to a long-term, systematic sampling of major TVA reservoirs has been made. The basis of the Vital Signs Monitoring is examination of appropriate physical, chemical, and biological indicators in three areas of each reservoir. These three areas are the forebay immediately upstream of the dam; the transition zone (the mid-reservoir region where the water changes from free flowing to more quiescent, impounded water); and the inflow or headwater region of the reservoir. The Use Impairments monitoring provides screening level information on the suitability of selected areas within TVA reservoirs for water contact activities (swimmable) and suitability of fish from TVA reservoirs for human consumption (fishable).

Dycus, D.L.; Meinert, D.L.

1991-08-01T23:59:59.000Z

244

Reservoir monitoring: 1990 summary of vital signs and use impairment monitoring on Tennessee Valley Reservoirs  

SciTech Connect (OSTI)

The Tennessee Valley Authority (TVA) initiated a Reservoir Monitoring Program on 12 TVA reservoirs (the nine main stream Tennessee river reservoirs -- Kentucky through Fort Loudoun and three major tributary storage reservoirs -- Cherokee, Douglas, and Norris) in autumn 1989. The objective of the Reservoir Monitoring Program is to provide basic information on the health'' or integrity of the aquatic ecosystem in each TVA reservoir ( Vital Signs'') and to provide screening level information for describing how well each reservoir meets the swimmable and fishable goals of the Clean Water Act (Use Impairments). This is the first time in the history of the agency that a commitment to a long-term, systematic sampling of major TVA reservoirs has been made. The basis of the Vital Signs Monitoring is examination of appropriate physical, chemical, and biological indicators in three areas of each reservoir. These three areas are the forebay immediately upstream of the dam; the transition zone (the mid-reservoir region where the water changes from free flowing to more quiescent, impounded water); and the inflow or headwater region of the reservoir. The Use Impairments monitoring provides screening level information on the suitability of selected areas within TVA reservoirs for water contact activities (swimmable) and suitability of fish from TVA reservoirs for human consumption (fishable).

Dycus, D.L.; Meinert, D.L.

1991-08-01T23:59:59.000Z

245

EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee.

246

DARPA's HPCS Program: History, Models, Tools, Languages Jack Dongarra, University of Tennessee and Oak Ridge National Lab  

E-Print Network [OSTI]

of Tennessee and Oak Ridge National Lab Robert Graybill, USC Information Sciences Institute William Harrod, University of California ­ San Diego Jeffery Vetter, Oak Ridge National Laboratory Katherine Yelick, Lawrence Berkeley National Laboratory Sadaf Alam, Oak Ridge National Laboratory Roy Campbell, Army Research

Dongarra, Jack

247

EIS-0071: Memphis Light, Gas and Water Division Industrial Fuels Gas Demonstration Plant, Memphis, Shelby County, Tennessee  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this EIS to assesses the potential environmental impacts associated with the construction and operation of a 3,155-ton-per-day capacity facility, which will demonstrate the technical operability, economic viability, and environmental acceptability of the Memphis Division of Light, Gas and Water coal gasification plant at Memphis, Tennessee.

248

ENGINEERS DAYENGINEERS DAYThis year the University of Tennessee College of Engineering is celebrating the 100th Anniversary of  

E-Print Network [OSTI]

ENGINEERS DAYENGINEERS DAYThis year the University of Tennessee College of Engineering is celebrating the 100th Anniversary of Engineers Day. Each October, undergraduate engineering classes of potential engineering students from high schools across the region. Last year, close to 1,000 students from

Tennessee, University of

249

ELECTRICAL ENGINEERING EECS Department  

E-Print Network [OSTI]

ELECTRICAL ENGINEERING EECS Department The Electrical Engineering and Computer Science (EECS) Department at WSU offers undergraduate degrees in electrical engineering, computer engineering and computer science. The EECS Department offers master of science degrees in computer science, electrical engineering

250

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Renewable Electricity Generation and Storage Technologies for Sustainable Energy, LLC. #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable;Suggested Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory

251

,"Tennessee Natural Gas Price Sold to Electric Power Consumers (Dollars per Thousand Cubic Feet)"  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: EnergyShale ProvedTexas"Brunei (Dollars per ThousandPrice Sold to9"3LNG Storage NetPrice

252

Electrical receptacle  

DOE Patents [OSTI]

The invention is a receptacle for a three prong electrical plug which has either a tubular or U-shaped grounding prong. The inventive receptacle has a grounding prong socket which is sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having two ridges to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket. The two ridges are made to prevent the socket from expanding when either the U-shaped grounding prong or the tubular grounding prong is inserted.

Leong, R.

1993-06-22T23:59:59.000Z

253

Solar-Assisted Electric Vehicle Charging Station Interim Report  

SciTech Connect (OSTI)

Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data by the end of government fiscal year 2012. Lessons learned from the sites completed thus far are being incorporated and are proving to be invaluable in completion of the remaining sites.

Lapsa, Melissa Voss [ORNL; Durfee, Norman [ORNL; Maxey, L Curt [ORNL; Overbey, Randall M [ORNL

2011-09-01T23:59:59.000Z

254

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network [OSTI]

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

255

Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park, Summary Report, May 2003  

Broader source: Energy.gov [DOE]

This report provides the results of an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP).

256

Interim Letter Report - Verification Survey of Partial Grids H19, J21, J22, X20, and X21 at the David Witherspoon, Inc. 1630 Site, Knoxville Tennessee  

SciTech Connect (OSTI)

Conduct verification surveys of available grids at the David Witherspoon Incorporated 1630 Site (DWI 1630) in Knoxville, Tennessee. The IVT conducted verification activities of partial grids H19, J21, J22, X20, and X21.

P.C. Weaver

2008-03-19T23:59:59.000Z

257

Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

Bechtel Jacobs

2010-02-01T23:59:59.000Z

258

EIA Electric Power Forms  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelawareTexasMissouri NuclearTennesseeWashington-EIA

259

Design demonstrations for category B tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document presents design demonstrations conducted of liquid low-level waste (LLLW) storage tank systems located at the Oak Ridge National Laboratory (ORNL). Demonstration of the design of these tank systems has been stipulated by the Federal Facility Agreement (FFA) between the US Environmental Protection Agency (EPA)-Region IV; the Tennessee Department of Environment and Conservation (TDEC); and the DOE. The FFA establishes four categories of tanks. These are: Category A -- New or replacement tank systems with secondary containment; Category B -- Existing tank systems with secondary containment; Category C -- Existing tank systems without secondary containment; Category D -- Existing tank systems without secondary containment that are removed from service. This document provides a design demonstration of the secondary containment and ancillary equipment of 11 tank systems listed in the FFA as Category B. The design demonstration for each tank is presented.

Not Available

1994-11-01T23:59:59.000Z

260

Annual Storm Water Report for the Y-12 National Security Complex, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The storm water pollution prevention program at the Y-12 National Security Complex (Y-12 Complex) intends to protect the quality of storm water runoff through: (1) reducing the exposure of metal accumulation areas to precipitation, (2) implementation of Best Management Practices, (3) sampling during rain events and subsequent analysis, and (4) routine surveillances. When prescribed, the analytical data is compared to a set of cut-off concentration values to determine how the Y-12 Complex relates to other metal fabrication industries in the state of Tennessee. The quality of the storm water exiting the Y-12 Complex via East Fork Poplar Creek indicated some improvement in 2011. This improvement is attributable to the completion of several construction, demolition and remediation projects which occurred in 2010 and 2011. Emphasis will continue to be placed on site inspections and the timely implementation of improved storm water control measures as deemed necessary.

Clean Water Compliance Section of the Environment Compliance Department

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Annual Storm Water Report for the Y-12 National Security Complex Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The storm water pollution prevention program at the Y-12 National Security Complex (Y-12 Complex) intends to protect the quality of storm water runoff through: (1) reducing the exposure of metal accumulation areas to precipitation, (2) implementation of Best Management Practices, (3) sampling during rain events and subsequent analysis, and (4) routine surveillances. When prescribed, the analytical data is compared to a set of cut-off concentration values to determine how the Y-12 Complex relates to other metal fabrication industries in the state of Tennessee. The quality of the storm water exiting the Y-12 Complex via East Fork Poplar Creek indicated some improvement in 2011. This improvement is attributable to the completion of several construction, demolition and remediation projects which occurred in 2010 and 2011. Emphasis will continue to be placed on site inspections and the timely implementation of improved storm water control measures as deemed necessary.

Environment Compliance Department

2012-01-01T23:59:59.000Z

262

Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

NONE

1997-09-01T23:59:59.000Z

263

Tennessee Oversight Agreement combined annual reports, May 13, 1991--May 12, 1993  

SciTech Connect (OSTI)

The Tennessee Oversight Agreement provides independent oversight and monitoring of the Department of Energy`s activities on the Oak Ridge Reservation by the State. The agreement obligates the state to provide an annual report to DOE and for public distribution of the results of the DOE Oversight Division`s monitoring and analysis activities and its findings of the quality and effectiveness of the Department of Energy`s environmental monitoring and surveillance programs. The DOE Oversight Division`s first report will discuss the status of the entire oversight agreement for the first two years of its existence. The 1991--1993 combined annual reports include a short history of the Division, a list of the Tennessee Oversight Agreement commitments and a status report on each of DOE Oversight Division`s programs. Each Division program includes a descriptive status of its findings and recommendations. These findings and recommendations were also consolidated into a separate segment of the report (Chapter 7). Findings indicate there have been genuine successes in the areas of site access and data availability. More effort, however, is required in both of these areas before the state can verify that DOE and its contractors are meeting its obligations. Ambient surveillance monitoring by DOE is extensive. The DOE Oversight Division reviews this data to assure the state and its citizens that all areas of the environment are adequately protected by DOE operations. There is a noticeable lack of research and development in the technology for environmental remediation and radiological and mixed waste treatment, storage and disposal. The DOE Oversight Division`s recommendations for improvement are provided with each of the findings listed in this report.

NONE

1993-07-01T23:59:59.000Z

264

Organic-matter preservation in Chattanooga Shale: revised Late Devonian correlations, Kentucky and Tennessee  

SciTech Connect (OSTI)

Continued interest in the carbon-rich shale of Devonian and Mississippian age in Kentucky is reflected by intensive leasing and drilling to evaluate the potential reserves of oil shale. Thicker accumulations of shale suitable for surface extraction lie along the flanks of the Cincinnati arch in both the Illinois and Appalachian basins. The shale tends to thin across the Cincinnati arch by an order of magnitude (100 versus 10 m, 330 versus 33 ft), and individual units disappear entirely. Key beds have been used with mixed success in tracing these changes. Recognition of these key beds in cores provided by a recently completed 70-core drilling program in and near the outcrop is the basis for revising earlier suggested correlations. One key bed, marked by the occurrence of the alga. Foerstia (Protosalvinia), occurs in the lower part of the lower (Huron) member of the Ohio Shale in the Appalachian basin. The Huron Member is overlain by a lithostratigraphic marker, the Three Lick Bed. The Foerstia Zone has been traced in core and outcrop to the upper part of the uppermost (Clegg Creek) member of the New Albany Shale in the Illinois basin. Discovery in this widespread continuous biostratigraphic marker at the top of the upper (Gassaway) member of the Chattanooga Shale near the designated reference section in Dekalb County, Tennessee, suggests that the Three Lick Bed of the Ohio Shales does not correlate with the unit of the Gassaway Member of the Chattanooga Shale as thought. Field relations indicate that the Three Lick Bed is absent by nondeposition, and starved-basin conditions prevailed into Early Mississippian time in this part of Tennessee.

Kepferle, R.C.; Pollock, J.D.; Barron, L.S.

1983-03-01T23:59:59.000Z

265

Jones Electric Moho Page 1 ImagingandobservingtheElectricalMoho  

E-Print Network [OSTI]

Jones Electric Moho Page 1 ImagingandobservingtheElectricalMoho Alan G. Jones Dublin Institute version: 18 July, 2012 Revised version: 06 February 2013 Keywords: Moho, electrical Moho, electrical conductivity, electrical resistivity, crustmantle boundary #12;Jones Electric Moho Page 2 Abstract

Jones, Alan G.

266

University of Strathclyde Dpt of Electric Electrical Engineering...  

Open Energy Info (EERE)

Strathclyde Dpt of Electric Electrical Engineering Institute for Energy and Enviro Jump to: navigation, search Name: University of Strathclyde, Dpt of Electric & Electrical...

267

Estimating the Value of Electricity Storage Resources in Electricity...  

Broader source: Energy.gov (indexed) [DOE]

Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 Estimating the Value of Electricity Storage Resources in Electricity Markets - EAC 2011 The...

268

Electrical Generation for More-Electric Aircraft using Solid...  

Broader source: Energy.gov (indexed) [DOE]

Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells This study, completed by...

269

Southeastern Electric- Electric Equipment Loan Program  

Broader source: Energy.gov [DOE]

Southeastern Electric Cooperative is a member-owned electric cooperative that serves customers in the southeastern part of South Dakota. Southeastern offers a loan program for customers who want...

270

EIS-0305: Treating Transuranic (TRU)/Alpha Low-Level at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

Treating Transuranic (TRU)/Alpha Low-Level Waste at the Oak Ridge National Laboratory, Oak Ridge, Tennessee)This EIS evaluates DOE's proposal to construct, operate, and decontaminate/decommission a Transuranic (TRU) Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-level waste solids. The mixed waste sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste.

271

Electric Vehicle Research Group  

E-Print Network [OSTI]

.................................................................................9 From diesel to electric: a new era in personnel transport for underground coal minesElectric Vehicle Research Group Annual Report 2012 #12;Table of Contents Executive Summary................................................................................8 C2-25 Electric Vehicle Drivetrain

Liley, David

272

Electric car Gasoline car  

E-Print Network [OSTI]

ENAC/ Electric car (Renault) Gasoline car (competitors) Gasoline car (Renault) Market shares of an electric vehicle? Electric car (Renault) Gasoline car (competitors) Gasoline car (Renault) Market shares preference survey with choice situation contexts involving gasoline cars (Renault and competitors

273

ELECTRICAL ENERGY SYSTEMS ELECTRICAL ENERGY SYSTEMS  

E-Print Network [OSTI]

countries to install solar energy technologies into local schools and hospitals. In its Energy PolicyMEng ELECTRICAL ENERGY SYSTEMS #12;MEng ELECTRICAL ENERGY SYSTEMS Electrical energy is vital aspects of modern life. One of the biggest challenges facing society is the need for reliable energy

Strathclyde, University of

274

DOE handbook electrical safety  

SciTech Connect (OSTI)

Electrical Safety Handbook presents the Department of Energy (DOE) safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety guidance and information for DOE installations to effect a reduction or elimination of risks associated with the use of electrical energy. The objectives of this handbook are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

NONE

1998-01-01T23:59:59.000Z

275

Electrical safety guidelines  

SciTech Connect (OSTI)

The Electrical Safety Guidelines prescribes the DOE safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety standards and guidance for DOE installations in order to affect a reduction or elimination of risks associated with the use of electrical energy. The objectives of these guidelines are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

Not Available

1993-09-01T23:59:59.000Z

276

California's electricity crisis  

E-Print Network [OSTI]

The collapse of California's electricity restructuring and competition program has attracted attention around the world. Prices in California's competitive wholesale electricity market increased by 500% between the second ...

Joskow, Paul L.

2001-01-01T23:59:59.000Z

277

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

marketers to compete to serve customers and these competitive retail suppliers offer electricity at a market-based price. EIA does not directly collect retail electricity...

278

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Update is prepared by the Electric Power Operations Team, Office of Electricity, Renewables and Uranium Statistics, U.S. Energy Information Administration (EIA), U.S....

279

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Towards Numerical Growth Model for Laser Damage is a senior member of IEEE (the Institute of Electrical and Electronics Engineers), member of SPIE

280

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for September 2014 | Release Date: Nov. 25, 2014 | Next Release Date: Dec. 23, 2014 Previous Issues Issue:...

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See all Electricity Reports Electricity Monthly Update With Data for October 2014 | Release Date: Dec. 23, 2014 | Next Release Date: Jan. 26, 2015 Previous Issues Issue:...

282

Edison Electric Institute Update  

Broader source: Energy.gov [DOE]

Presentationgiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingdiscusses the Edison Electric Institute (EEI) and the current electricity landscape.

283

Data report: Illinois, Indiana, Kentucky, Tennessee, and Ohio. National Uranium Resource Evaluation Program. Hydrogeochemical and stream sediment reconnaissance  

SciTech Connect (OSTI)

This report presents the results of ground water, stream water, and stream sediment reconnaissance in Illinois, Indiana, Kentucky, Tennessee, and Ohio. The following sample types were collected in each state: Illinois - 716 stream sediment, 1046 ground water, 337 stream water; Indiana - 126 stream sediment, 443 ground water, 111 stream water; Kentucky - 4901 stream sediment, 6408 ground water, 3966 stream water; Tennessee - 3309 stream sediment, 3574 ground water, 1584 stream water; Ohio - 1214 stream sediment, 2049 ground water, 1205 stream water. Neutron activation analyses are given for U, Br, Cl, F, Mn, Na, Al, V, and Dy in ground water and stream water, and for U, Th, Hf, Ce, Fe, Mn, Na, Sc, Ti, V, Al, Dy, Eu, La, Sm, Yb, and Lu in sediments. Supplementary analyses by other techniques are reported for U (extractable), Ag, As, Ba, Be, Ca, Co, Cr, Cu, K, Li, Mg, Mo, Nb, Ni, P, Pb, Se, Sn, Sr, W, Y, and Zn. These analyses were made on 248 sediment samples from Tennessee. Field measurements and observations are reported for each site. Oak Ridge National Laboratory analyzed sediment samples which were not analyzed by Savannah River Laboratory neutron activation.

Sargent, K A; Cook, J R; Fay, W M

1982-02-01T23:59:59.000Z

284

ELECTRICAL AND COMPUTER ENGINEERING  

E-Print Network [OSTI]

Edison (prolific inventor), Nikola Tesla (inventor of the electric motor, transformer), Dilbert (comic

Haykin, Simon

285

Massachusetts Electric Vehicle Efforts  

E-Print Network [OSTI]

Massachusetts Electric Vehicle Efforts Christine Kirby, MassDEP ZE-MAP Meeting October 24, 2014 #12 Provide Clean Air Grow the Clean Energy Economy Electric vehicles are a key part of the solution #12 is promoting EVs 4 #12;TCI and Electric Vehicles Established the Northeast Electric Vehicle Network through

California at Davis, University of

286

LABORATORY V ELECTRIC CIRCUITS  

E-Print Network [OSTI]

Lab V -1 LABORATORY V ELECTRIC CIRCUITS Electrical devices are the cornerstones of our modern world understanding of them. In the previous laboratory, you studied the behavior of electric fields and their effect on the motion of electrons using a cathode ray tube (CRT). This beam of electrons is one example of an electric

Minnesota, University of

287

Electronics, Electrical Engineering  

E-Print Network [OSTI]

SCHOOL OF Electronics, Electrical Engineering and Computer Science IS IN YOUR HANDS THE FUTURE #12;SCHOOL OF Electronics, Electrical Engineering and Computer Science2 CAREERS IN ELECTRONICS, ELECTRICAL Belfast. Ranked among the top 100 in the world for Electrical and Electronic Engineering (QS World

288

EFCOG / DOE Electrical Safety  

E-Print Network [OSTI]

EFCOG / DOE Electrical Safety Improvement Project Project Area 4 ­Performance Measurement Electrical Severity Measurement Tool Revision 1 April 16, 2007 #12;Electrical Severity Measurement Tool Purpose: This tool is intended to determine the severity of an electrical energy event based

289

Syracuse University Electrical Engineering  

E-Print Network [OSTI]

Syracuse University Electrical Engineering and Computer Science Tenure Track Faculty Position in Electrical Engineering The Department of Electrical Engineering and Computer Science is seeking applicants for a tenure track position in Electrical Engineering starting in August 2014 or January 2015. The department

Mather, Patrick T.

290

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Exploration of High-Penetration Renewable Electricity Futures PDF Volume 4 PDF #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory. (2012

291

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study End-use Electricity Demand Volume 3 of 4 Volume 2 PDF Volume 3;Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U Sandor, D. National Renewable Energy Laboratory Suggested Citations Renewable Electricity Futures Study

292

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Bulk Electric Power Systems: Operations and Transmission by the Alliance for Sustainable Energy, LLC. #12;Renewable Electricity Futures Study Edited By Hand, M.M. National Suggested Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory

293

Computational Needs for the Next Generation Electric Grid Proceedings  

E-Print Network [OSTI]

systembasedon PMU data, CRIS 2009 ? FourthsingularvaluemethodsforPMUdata interpretation,PSERCFurthermore, the PMU data collected by the Tennessee

Birman, Kenneth

2012-01-01T23:59:59.000Z

294

GAINING CONSENSUS: THE STORY OF ''OAK RIDGE TENNESSEE - A CITIZEN'S GUIDE TO THE ENVIRONMENT''  

SciTech Connect (OSTI)

In 2001, a diverse group of citizens ranging from conservationists to industrial developers joined forces to produce a factual description of Oak Ridge's environment and the issues associated with contamination on the U.S. Department of Energy (DOE) reservation. This consensus effort was a result of common values not generally seen in this spectrum of philosophies, and of shared concerns about rising property taxes, declining city services, fleeing retail establishments, and diminishing real estate values. These problems are attributed to waning local DOE budgets coupled with Oak Ridge's national reputation of being contaminated and unsafe. This undeserved reputation harms the city's ability to attract new industry to replace declining federal employment and to induce families to live in the community. Representatives from a spectrum of conservation, environmental, economic development, local government, and civic organizations were invited to meet regarding how to best explain the complex environmental story of Oak Ridge and the DOE reservation. This large group decided to publish a straightforward explanation of the environmental quality of the city and its relationship to the DOE reservation in easy-to-understand language. The result was Oak Ridge, Tennessee--A Citizen's Guide to the Environment, a 28-page glossy booklet, distributed through the Chamber of Commerce and other organizations. The Oak Ridger ensured wide distribution in the community by publishing it as an insert in the daily paper. The material is also available on several web sites. A trifold brochure summarizing and promoting the larger document was also produced for wider distribution. The integrity of the Citizen's Guide was ensured by having a six-member editorial team manage writing and review of the document. There was no direct involvement by the DOE and its contractor. Knowledgeable citizen writers from throughout the community contributed technical and descriptive text. A professional technical editor melded the disparate styles into a cohesive publication. Volunteers from about 100 organizations reviewed the draft for accuracy of content and readability. Participating organizations, upon review of the final draft, then decided whether their names would be listed in the document as contributors and supporters. While the writing and editing was primarily accomplished by conservation and civic organizations, funding to print the final publications came largely from economic development interests and their supporters. The positive reception from the public upon release of Oak Ridge, Tennessee--A Citizen's Guide to the Environment stands as testament to the ability of diverse interest groups to come to consensus and communicate the environmental value of their community.

Craig, Robert; Freeman, Jenny; Gawarecki, Susan L; Hardy, Parker; Kopp, Steve; Mulvenon, Norman A; Pardue, William; Sarno, Doug

2003-02-27T23:59:59.000Z

295

Introduction Computational Efficiency Electricity Portfolio Planning Electricity Portfolios  

E-Print Network [OSTI]

Introduction Computational Efficiency Electricity Portfolio Planning Electricity Portfolios 2009/11/30­12/01 István Maros Electricity Portfolio #12;Introduction Computational Efficiency Electricity Portfolio Outline 1 Introduction 2 Computational Efficiency 3 Electricity Portfolio Approximate

296

Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is further supported by a No Further Investigation (NFI) determination made on land that adjoins ED-4 to the east (DOE 1997a) and to the south (DOE 1997b).

SAIC

2008-05-01T23:59:59.000Z

297

ECE 438 Electric and Hybrid Vehicles Catalog Description: History of electric traction. Introduction to electric and hybrid-electric  

E-Print Network [OSTI]

ECE 438 ­ Electric and Hybrid Vehicles Catalog Description: History of electric traction. Introduction to electric and hybrid-electric vehicle configurations. Vehicle mechanics. Energy sources and storage. Range prediction. Motor for HEVs. Electric drive components. Vehicle transmission system. Credits

298

Richmond Electric Vehicle Initiative Electric Vehicle Readiness...  

Office of Environmental Management (EM)

MO) Vehicles Home About Vehicle Technologies Office Plug-in Electric Vehicles & Batteries Fuel Efficiency & Emissions Alternative Fuels Modeling, Testing, Data & Results Education...

299

Community Energy Systems and the Law of Public Utilities. Volume Forty-four. Tennessee  

SciTech Connect (OSTI)

A detailed description is presented of the laws and programs of the State of Tennessee governing the regulation of public energy utilities, the siting of energy generating and transmission facilities, the municipal franchising of public energy utilities, and the prescription of rates to be charged by utilities including attendant problems of cost allocations, rate base and operating expense determinations, and rate of return allowances. These laws and programs are analyzed to identify impediments which they may present to the implementation of Integrated Community Energy Systems (ICES). This report is one of fifty-one separate volumes which describe such regulatory programs at the Federal level and in each state as background to the report entitled Community Energy Systems and the Law of Public Utilities - Volume One: An Overview. This report also contains a summary of a strategy described in Volume One - An Overview for overcoming these impediments by working within the existing regulatory framework and by making changes in the regulatory programs to enhance the likelihood of ICES implementation.

Feurer, D.A.; Weaver, C.L.

1981-01-01T23:59:59.000Z

300

Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

AESOP XX: summary of proceedings. [Gatlinburg, Tennessee, April 24 to 26, 1979  

SciTech Connect (OSTI)

The 20th meeting of the Association for Energy Systems, Operations, and Programming (AESOP) was held in Gatlinburg, Tennessee, on April 24 to 26, 1979. Representatives of DOE Headquarters discussed the effects that new security and privacy regulations will have on automatic data processing operations. The status and future possibilities of the Business Management Information System (BMIS) were also discussed. Then representatives of various DOE offices and contractors presented reports on various topics. This report contains two-page summaries of the papers presented at the meeting. Session topics and titles of papers were as follows: Washington report (New ADP issues; BMIS: the Business Management Information System; Nuclear weapons and the computer); Improving the productivity of the computing analyst/programer (What productivity improvement tools are available; Rocky Flats experience with SDM/70; Albuquerque Operations Office experience with SDM/70; Planning and project management; Minicomputer standards and programer productivity; MRC productivity gains through applications development tools); User viewpoints and expectations of data processing (User perspectives on computer applications; User viewpoints on environmental studies; Planning and implementing a procurement system; Two sides of the DP coin); Data base management (Use of data base systems within DOE; Future trends in data base hardware; Future trends in data base software; Toward automating the data base design process); and Management discussions. Complete versions of three of the papers have already been cited in ERA. These can be located by reference to the entry CONF-790431-- in the Report Number Index. (RWR)

none,

1980-03-01T23:59:59.000Z

302

Routine environmental audit of the K-25 Site, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report documents the results of the Routine Environmental Audit of the K-25 Site in Oak Ridge, Tennessee, conducted February 14 through February 25, 1994, by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) located within the Office of Environment, Safety and Health (EH). The Routine Environmental Audit for the K-25 site was conducted as an environmental management assessment, supported through reviews of the Waste Management Program and the Decontamination and Decommissioning Program. The assessment was conducted jointly with, and built upon, the results provided by the ``DOE Oak Ridge Operations Office Environment, Safety, health and Quality Assurance Appraisal at the K-25 Site.`` DOE 5482.1B, ``Environment, Safety and Health Appraisal Program,`` established the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The purpose of this assessment is to provide the Secretary of Energy and senior DOE managers with concise independent information as part of DOE`s continuing effort to improve environmental program performance. The ultimate goal of EH-24 is enhancement of environmental protection and the minimization of risk to public health and the environment. The routine environmental audit is one method by which EH-24 accomplishes its mission, utilizing systematic and periodic evaluations of the Department`s environmental programs within line organizations.

Not Available

1994-02-01T23:59:59.000Z

303

Evidence for ground-water circulation in the brine-filled aquitard, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

Various geologic, hydrologic, and geochemical methods were used to assess active ground-water circulation in a brine-filled, deep (> 50 m below land surface) aquitard underlying the Oak Ridge Reservation, Tennessee. In places, the brine which was presumed to be stagnant in the past, contains various contaminants. If ground-water circulation is viable in the brine-containing formations, then remediation or containment of the deep-seated contaminants should be considered a high priority. Data used to determine this included (1) spatial and temporal pressures and hydraulic heads measured in the aquitard, (2) hydraulic parameters of the formations in question, (3) vertical temperature gradients, and (4) spatial and temporal chemical and isotopic composition of the saline ground water. Conclusions suggest that the saline water contained at depth is not isolated (in terms of recharge and discharge) from the overlying active and fresh-water-(< 500 mg/l) bearing units. Consequently, influx of young water (and contamination) from land surface does occur. Potential discharge into the shallow aquifers was assumed where the hydraulic head of the saline water was higher than that in the shallow aquifers, accounting for temperature and salinity anomalies observed close to land surface. The confined water (and dissolved solutes) move along open conduits at relatively high velocity into adjacent, more permeable units.

Nativ, R. [Hebrew Univ. of Jerusalem (Israel). Dept. of Soil and Water Sciences; Halleran, A.; Hunley, A. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

1997-07-01T23:59:59.000Z

304

Fiscal year 1995 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from September 1994 through August 1995. A total of 67 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned if (1) its construction did not meet current standards (substandard construction); (2) it was irreparably damaged or had deteriorated beyond practical repair; (3) its location interfered with or otherwise impeded site operations, construction, or closure activities; or (4) special circumstances existed as defined on a case-by-case basis and approved by the Y-12 Plant Groundwater Protection Program (GWPP) Manager. This summary report contains: general geologic setting of the Y-12 Plant and vicinity; discussion of well plugging and abandonment methods, grouting procedures, and waste management practices (a Waste Management Plan for Drilling Activities is included in Appendix C); summaries of plugging and abandonment activities at each site; and quality assurance/quality control (QA/QC) and health and safety protocols used during the FY 1995 Plugging and Abandonment Program.

NONE

1995-09-01T23:59:59.000Z

305

Persistence of Hydrologic Variables and Reactive Stream Solute Concentrations in an East Tennessee Watershed  

SciTech Connect (OSTI)

Time and frequency domain analyses were conducted on weekly time series of water chemistry (nitrate, sulfate and calcium concentrations) collected from November 1995 to December 2005 at the West Fork of Walker Branch in Oak Ridge, Tennessee to evaluate the extent of their persistence and the relationship of this persistence to discharge and rainfall. In this study, spectral and wavelet analyses provided a theoretical basis for insights into long-term water chemistry behavior. All water chemistry parameters showed some level of persistence that was influenced by rainfall and/or discharge. Short-term persistence (less than a year) was related to the persistence of rainfall and discharge, whereas long-term persistence (more than a year) was related to the persistence of discharge. The Walker Branch conceptual hydrology model is augmented by these results that relate characteristic periodicities with flowpaths through different zones: the vadose zone (< 20 week period), saturated zone (20-50 week period) and bedrock zone (> 50 week period) with implications for reactive chemistries within the watershed. (C) 2011 Elsevier B.V. All rights reserved.

Koirala, Shesh R [ORNL; Gentry, Randall W [ORNL; Mulholland, Patrick J [ORNL; Perfect, Edmund [ORNL; Schwartz, John S [ORNL; Sayler, Gary Steven [ORNL

2011-01-01T23:59:59.000Z

306

Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

1995-11-01T23:59:59.000Z

307

Design demonstrations for Category B tank systems piping at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

Demonstration of the design of the piping systems described in this report is stipulated by the Federal Facility Agreement (FFA) between the U.S. Environmental Protection Agency (EPA)-Region IV, the Tennessee Department of Environment and Conservation (TDEC), and the U.S. Department of Energy (DOE). This report provides a design demonstration of the secondary containment and ancillary equipment of 30 piping systems designated in the FFA as Category B (i.e., existing tank systems with secondary containment). Based on the findings of the Design Demonstrations for the Remaining 19 Category B Tank Systems, (DOE/OR/03-1150 & D2), three tank systems originally designated as Category B have been redesignated as Category C (i.e., existing tank systems without secondary containment). The design demonstrations were developed using information obtained from design drawings (as-built when available), construction specifications, and interviews with facility operators. Each design demonstration addresses system conformance to the requirements of the FFA (Appendix F, Section C). Deficiencies or restrictions regarding the ability to demonstrate that each of the containment systems conforms to FFA requirements are noted in the discussion of each piping system and presented in Table 2.0-1.

NONE

1994-12-01T23:59:59.000Z

308

Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council  

SciTech Connect (OSTI)

The US Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1113) for the proposed lease of 957.16 acres of the Oak Ridge Reservation (ORR) to the East Tennessee Economic Council (ETEC), a non-profit community organization, for a period of 10 years, with an option for renewal. ETEC proposes to develop an industrial park on the leased site to provide employment opportunities for DOE and contractor employees affected by decreased federal funding. Based on the results of the analysis reported in the EA and implementation of mitigation measures defined in this Finding of No Significant Impact (FONSI), DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this mitigated FONSI. DOE will implement a Mitigation Action Plan for this project and provide annual reports on mitigation and monitoring.

NONE

1996-04-01T23:59:59.000Z

309

Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.

NONE

1997-09-01T23:59:59.000Z

310

Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.

NONE

1995-09-01T23:59:59.000Z

311

Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)  

SciTech Connect (OSTI)

Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

NONE

1997-05-01T23:59:59.000Z

312

Environmental Baseline Survey Report for the Title Transfer of the K-792 Switchyard Complex at the East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This environmental baseline survey (EBS) documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-792 Switchyard Complex, which includes the former K-792 Switchyard, the K-79 1-B building, the K-796-A building, and the K-792 Northern Expansion Area located in the northwestern portion of the East Tennessee Technology Park (ETTP). The total area of the property is approximately 19.91 acres. DOE is proposing to transfer the title of this land area and buildings to the Heritage Center, LLC (Heritage Center), a subsidiary corporation of the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the transfer of this government-owned facility at ETTP to a non-federal entity. The area proposed for title transfer includes the former K-792 Switchyard, the K-792 Northern Expansion Area, Bldg. K-791-B, Bldg. K-796-A, and the underlying property known as the underlying fee. Located within the K-792 Switchyard footprint but not included in the transfer are Bldg. K-131 0-MP and Bldg. K- 131 0-MQ, two buildings owned by a private company that leases space in the northern portion of the Switchyard. The transfer footprint is bounded by Perimeter Road to the north and west, the parking area for Portal 8 to the south, and primarily the former K-792 Powerhouse Complex and Avenue 'U' North to the east; however, the eastern boundary along the Northern Expansion area has no physical features associated with it. Zone 2 remedial action objectives were developed by the DVS to support the future use of ETTP as a mixed-use commercial and industrial park. Therefore, remediation criteria were designed for the protection of the future industrial worker under the assumption the worker normally would not have the potential for exposure to soils at depths below 10 ft below ground surface (bgs). Accordingly, land use controls (LUCs) have been established to restrict disturbance of soils below 10 ft deep and to limit future land use to industriallcornmercial activities. Where the need for LUCs below 10 ft bgs is not warranted, this is so stated and explained. Once all actions associated with the DVS for Zone 1 and Zone 2 are completed and the data support it, there will be a re-evaluation with EPA and TDEC for the restriction on excavation below 10 ft. The DVS process and the preparation of this report included visual and physical inspections of the property and adjacent properties, a detailed records search, sampling and analysis of soils, radiological walkover surveys, and a risk evaluation. Resources evaluated as part of the records search included Federal Government records, title documents, aerial photographs that may reflect prior uses, and interviews with current and former employees 1 involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes were stored for one year or more, known to have been released, or disposed of. In addition, radiological surveys of Bldgs. K-791-B and K-796-A were conducted to assess the buildings radiological condition. Soil vapor sampling and polychlorinated biphenyl (PCB) swipe sampling also were conducted within the buildings. Based on the U. S. Department of Energy's (DOE's) review of the existing information, including discussions and interviews referenced herein, and evaluation of the data gathered in preparation of the environmental baseline survey (EBS) for the K-792 Switchyard Complex, DOE recommends the following: Due to the uncertainty associated with the nature of the on-site groundwater and the need to evaluate and possibly address groundwater in the future, DOE recommends that the transfer of the K-792 Switchyard Complex be achieved by a covenant deferral per the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Sect. 120(h)(3)(c). Land use restrictions associated with the covenant deferral are described.

SAIC

2009-12-01T23:59:59.000Z

313

Electric arc saw apparatus  

DOE Patents [OSTI]

A portable, hand held electric arc saw has a small frame for supporting an electrically conducting rotary blade which serves as an electrode for generating an electric arc to erode a workpiece. Electric current is supplied to the blade by biased brushes and a slip ring which are mounted in the frame. A pair of freely movable endless belts in the form of crawler treads stretched between two pulleys are used to facilitate movement of the electric arc saw. The pulleys are formed of dielectric material to electrically insulate the crawler treads from the frame.

Deichelbohrer, Paul R [Richland, WA

1986-01-01T23:59:59.000Z

314

Request for closure, underground storage tank 2130-U: Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Facility ID {number_sign}0-010117  

SciTech Connect (OSTI)

This document presents a summary of the activities and analytical data related to the removal of underground storage tank (UST) 2130-U, previously located at the Oak Ridge Y-12 Plant. Removal of this tank was conducted in accordance with Tennessee Department of Environment and Conservation (TDEC) regulation 1200-1-15 (1992). A completed copy of the State of Tennessee, Division of Underground Storage Tanks, Permanent Closure Report Form is included as Appendix A of this document Based on the information and data presented herein, the Oak Ridge Y-12 Plant requests permanent closure for the tank 2130-U site.

Not Available

1993-12-01T23:59:59.000Z

315

Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100&D3 and Y/ER-53&D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs.

Not Available

1994-06-01T23:59:59.000Z

316

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network [OSTI]

management in the US electricity sector, Energy Policy, 23(deep reductions in electricity sector GHG emissions requireson the electricity sector. 19 Table 3.

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

317

Recent Graduate Electrical Engineer  

Broader source: Energy.gov [DOE]

This position is located in the Office of Electric Reliability. The Office of Electric Reliability helps protect and improve the reliability and security of the nation's bulk power system through...

318

Electric Efficiency Standard  

Broader source: Energy.gov [DOE]

In December 2009, the Indiana Utility Regulatory Commission's (IURC) ordered utilities to establish demand-side management (DSM) electric savings goals leading to 2.0% reduction of electricity...

319

EIA - State Electricity Profiles  

Gasoline and Diesel Fuel Update (EIA)

(megawatts) 32,547 9 Electric utilities 23,615 7 Independent power producers & combined heat and power 8,933 11 Net generation (megawatthours) 152,878,688 6 Electric utilities...

320

EIA - State Electricity Profiles  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

16,355 24 Electric Utilities 13,131 20 Independent Power Producers & Combined Heat and Power 3,225 30 Net Generation (megawatthours) 65,005,678 24 Electric Utilities...

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Agile Sensing Systems: Analysis, Design and Implementation" by Prof. Jun (Jason) Zhang Electrical and Computer Engineering University of Denver Tuesday requirements, computational complexity requirements, and robustness to time- varying physical environments

322

Electricity | Department of Energy  

Office of Environmental Management (EM)

Sources Electricity Electricity January 22, 2015 State of the Union Remarks on Energy in Four Charts We dive into the data behind President Obama's State of the Union statements...

323

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Mai, T.

2012-10-01T23:59:59.000Z

324

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Mai, T.

2012-11-01T23:59:59.000Z

325

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Mai, T.

2013-04-01T23:59:59.000Z

326

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050.

Hand, M. M.

2012-09-01T23:59:59.000Z

327

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

328

2012 National Electricity Forum  

Broader source: Energy.gov (indexed) [DOE]

Project Development, Pacific Gas & Electric * Brad Nickell, Director of Planning, Western Electricity Coordinating Council 12:00 pm - 12:30 pm Audience comments 12:30 pm Adjourn 1...

329

Intelligent Power Assist Algorithms for Electric Bicycles  

E-Print Network [OSTI]

electric hub motor . . . . . . . . . . . . . . . . . . .Golden Motor electric bicycle model MT-Electric hub motor in the front

Fan, Xuan

2010-01-01T23:59:59.000Z

330

IRRIGATION & ELECTRICAL DISTRICTS | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

IRRIGATION & ELECTRICAL DISTRICTS IRRIGATION & ELECTRICAL DISTRICTS IRRIGATION & ELECTRICAL DISTRICTS More Documents & Publications Interested Parties - WAPA Public...

331

The Case for Electric Vehicles  

E-Print Network [OSTI]

land Press, 1995 TESTING ELECTRIC VEHICLE DEMAND IN " HYBRIDThe Case for Electric Vehicles DanieI Sperlmg Reprint UCTCor The Case for Electric Vehicles Darnel Sperling Institute

Sperling, Daniel

2001-01-01T23:59:59.000Z

332

Electric Vehicle Smart Charging Infrastructure  

E-Print Network [OSTI]

for Multiplexed Electric Vehicle Charging, US20130154561A1,Chynoweth, Intelligent Electric Vehicle Charging System,of RFID Mesh Network for Electric Vehicle Smart Charging

Chung, Ching-Yen

2014-01-01T23:59:59.000Z

333

Electric Turbo Compounding Technology Update  

Broader source: Energy.gov (indexed) [DOE]

Turbo Compounding Technology Update Electric Turbo Compounding Technology Update 15 August, 2007 Carl Vuk 15 August, 2007 Carl Vuk Electric Turbo Compounding Highlights Electric...

334

Washington State Electric Vehicle  

E-Print Network [OSTI]

Washington State Electric Vehicle Implementation Bryan Bazard Maintenance and Alternate Fuel Technology Manager #12;Executive Order 14-04 Requires the procurement of electric vehicles where and equipment with electricity or biofuel to the "extent practicable" by June 2015 1. The vehicle is due

California at Davis, University of

335

LABORATORY IV ELECTRIC CIRCUITS  

E-Print Network [OSTI]

LABORATORY IV ELECTRIC CIRCUITS Lab IV - 1 In the first laboratory, you studied the behavior of electric fields and their effect on the motion of electrons using a cathode ray tube (CRT). This beam of electrons is one example of an electric current ­ charges in motion. The current in the CRT was simple

Minnesota, University of

336

Reduces electric energy consumption  

E-Print Network [OSTI]

BENEFITS · Reduces electric energy consumption · Reduces peak electric demand · Reduces natural gas consumption · Reduces nonhazardous solid waste and wastewater generation · Potential annual savings products for the automotive industry, electrical equipment, and miscellaneous other uses nationwide. ALCOA

337

DOE HANDBOOK ELECTRICAL SAFETY  

E-Print Network [OSTI]

DOE HANDBOOK ELECTRICAL SAFETY U.S. Department of Energy AREA SAFT Washington, D.C. 20585 of 139 3.0 HAZARD ANALYSIS 3.1 INTRODUCTION This chapter provides tools for assessing electrical hazards). The risk of a worker to an exposed electrical hazard is determined by (a) the classification

338

Renewable Electricity Futures Study  

E-Print Network [OSTI]

Renewable Electricity Futures Study Executive Summary NREL is a national laboratory of the U for Sustainable Energy, LLC. Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF #12;Renewable Electricity Futures. National Renewable Energy Laboratory Suggested Citations Renewable Electricity Futures Study (Entire Report

339

Survey of protected vascular plants on the Oak Ridge Reservation, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

Vascular plant surveys were initiated during fiscal year 1992 by the environmentally sensitive areas program to determine the baseline condition of threatened and endangered (T&E) vascular plant species on the Oak Ridge Reservation (ORR). T&E species receive protection under federal and state regulations. In addition, the National Environmental Policy Act (NEPA) requires that federally-funded projects avoid or mitigate impacts to listed species. T&E plant species found on or near the U.S. Department of Energy`s (DOE) Oak Ridge Reservation (ORR) are identified. Twenty-eight species identified on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these have been under review by the U.S. Fish and Wildlife Service for possible listing (listed in the formerly-used C2 candidate category). Additional species listed by the state occur near and may be present on the ORR. A range of habitats support the rare taxa on the ORR: river bluffs, sinkholes, calcareous barrens, wetlands, utility corridors, and forests. The list of T&E plant species and their locations on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated. The purpose of this document is to present information on the listed T&E plant species currently known to occur on the ORR as well as listed species potentially occurring on the ORR based on geographic range and habitat availability. For the purpose of this report, {open_quotes}T&E species{close_quotes} include all federal- and state-listed species, including candidates for listing, and species of special concern. Consideration of T&E plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival.

Awl, D.J.; Pounds, L.R.; Rosensteel, B.A.; King, A.L.; Hamlett, P.A.

1996-06-01T23:59:59.000Z

340

Tennessee Oversight Agreement annual report, May 13, 1993--May 12, 1994  

SciTech Connect (OSTI)

This report discusses the activities of the Division of DOE Oversight in the areas of coordination with other State Agencies with regard to environmental restoration, corrective action, and waste management activities on the Oak Ridge Reservation; and the Division`s efforts to keep the public informed of those DOE activities that may impact their health and the environment. This report includes the status of the Division`s efforts in implementing the Tennessee Oversight Agreement (TOA). Each Program Section provides information concerning the status of its activities. The Administrative Section has been instrumental in achieving access to the ORR without prior notification to DOE and in obtaining documents and environmental, waste management, safety, and health information in a timely manner. The Environmental Restoration Program has provided in-depth document reviews and on-site coordination and monitoring of field activities required under the Federal Facility Agreement. Most notable of the activities are the investigations and planned remediation of the Lower East Fork Poplar Creek and the Watts Bar Reservoir. The Waste Management Program has audited DOE`s compliance with air, water, solid, hazardous, and mixed waste storage, treatment, and disposal regulations. Effort was focused on all three DOE Facilities on the ORR. The final portion of this report discusses the Division`s findings and recommendations. Most significant of these issues is the Division`s request to be an active participant in DOE`s prioritization of its TOA commitments. Other issues discussed include long term storage of radioactive waste and the use of environmental restoration funds. A discussion of those findings and recommendations provided in last year`s annual report and addressed by DOE are included in this report as well. All documents, logs, files, etc. supporting this report are available for review during routine business hours at the Division`s office.

NONE

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Electrical Generation for More-Electric Aircraft using Solid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DE-AC05-76RL01830 Electrical Generation for More-Electric Aircraft using Solid Oxide Fuel Cells GA Whyatt LA Chick April 2012 PNNL-XXXXX Electrical Generation for More- Electric...

342

Determination of Electric-Field, Magnetic-Field, and Electric...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electric-Field, Magnetic-Field, and Electric-Current Distributions of Infrared Optical Antennas: A Near-Field Determination of Electric-Field, Magnetic-Field, and Electric-Current...

343

Random Walks and Electrical Networks Electrical Network  

E-Print Network [OSTI]

Feb 4, 2008 ... Random Walks and Electrical Networks. Hitting Probabilities and Voltage. Voltage. Connect a 1V battery to nodes a and b. ix,y is the current...

Jonathon Peterson

2008-01-30T23:59:59.000Z

344

Teaching Perspective The Bristol Dinosaur Project  

E-Print Network [OSTI]

­1895) went a step further than their forebears, and made specific efforts to broaden the interested constituency. Owen famously advised on the construction of life- sized concrete models of dinosaurs

Benton, Michael

345

Page 1 of 3 UNIVERSITY OF BRISTOL  

E-Print Network [OSTI]

and University Secretary Members of Council Dr Andrew Garrad Mr Andrew Poolman Mr Tony Macdonald Professor Roger Horsten Prof R L Vilain Pro J A C Sterne Prof J Memmott Prof N C Norman Prof J-M Kendall Prof N Linden Dr Elmhirst Mr Ian Flavell Mr Matthew Grady Mr Charles Gunter #12;Page 3 of 3 Mr John Robert Harmer Mr Andrew

Bristol, University of

346

Page 1 of 14 University of Bristol  

E-Print Network [OSTI]

Mary Colwell-Hector (BSc 1986), Mr Stephen Cooke (BA 1980), Mr Richard Cross (BA 1991), Mr Christopher Patricia D'Avray (BA 1971), Mr Brian Dicker (MSc 1966, BSc 1957), Mr Christopher Didcote (BSc 2008), Mrs, BA 1952), Miss Stella Saywell MA (Honorary MA 1984), Mr Keith Scott (BA 1960), Mr John Sherriff (BA

Bristol, University of

347

W4B Bristol | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformationSEDS data Jump to: navigation, searchVycon IncInc Jump to:B

348

Bristol Virginia Utilities | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Area SolarConnecticut:659243° Loading map...Utilities Jump to:

349

Bristol, Connecticut: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Area SolarConnecticut:659243° Loading map...Utilities Jump

350

Electric Charge and Electric Field Electrostatics: Charge at rest  

E-Print Network [OSTI]

Chapter 16 Electric Charge and Electric Field #12;Electrostatics: Charge at rest Electric Charges of conservation of Electric Charge: The net amount of electric charge produced in any process is zero. Model, neutral). #12;· All protons and electrons have same magnitude of electric charge but their masses

Yu, Jaehoon

351

DIVISION 16 -ELECTRICAL 16000 GENERAL  

E-Print Network [OSTI]

Electrical Code American National Standards Institute National Electrical Manufacturers Association Institute of Electrical & Electronics Engineers Insulated Cable Engineers Association 3. Three copies of the followingDIVISION 16 - ELECTRICAL _____________________________________________________________ 16000

352

Site characterization plan for groundwater in Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization to identify environmental contamination that may be present. This document, Site Characterization Report for Groundwater in Waste Area Grouping I at Oak Ridge National Laboratory, Oak Ridge, Tennessee, identifies areas of concern with respect to WAG 1 groundwater and presents the rationale, justification, and objectives for conducting this continuing site characterization. This report summarizes the operations that have taken place at each of the areas of concern in WAG 1, summarizes previous characterization studies that have been performed, presents interpretations of previously collected data and information, identifies contaminants of concern, and presents an action plan for further site investigations and early actions that will lead to identification of contaminant sources, their major groundwater pathways, and reduced off-site migration of contaminated groundwater to surface water. Site characterization Activities performed to date at WAG I have indicated that groundwater contamination, principally radiological contamination, is widespread. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to an unknown extent. The general absence of radiological contamination in surface water at the perimeter of WAG 1 is attributed to the presence of pipelines and underground waste storage tank sumps and dry wells distributed throughout WAG 1 which remove more than about 40 million gal of contaminated groundwater per year.

Lee, R.R.; Curtis, A.H.; Houlberg, L.M.; Purucker, S.T.; Singer, M.L.; Tardiff, M.F.; Wolf, D.A.

1994-07-01T23:59:59.000Z

353

Decentralized electricity, cogeneration, and conservation options. [Conference paper  

SciTech Connect (OSTI)

An early evaluation o the Home Insulation Program indicates that it is possible to carry on major conservation programs that result in a substantial saving to Tennessee Valley Authority (TVA) customers both from reduced electric bills and from reduction in electric system cost. The evidence from the TVA program strongly indicates that many utilities could realize benefits for themselves and their customers by implementing a comprehensive program for decentralized electricity, load management, cogeneration, and conservation. Of course, any financial benefit to the utility would be contingent on the treatment of costs associated with these programs on the balance sheet, on the income statement, and in allowable rate of return calculations. In particular, utility financing of customer installation of energy conservation and renewable energy systems must be treated in a manner that allows the utility to earn an acceptable rate of return. The Pacific Power and Light (PPL) Residential Energy Efficiency Rider is an example of how this can be handled. The program is beneficial to the utility because the entire cost of the weatherization measure can be added to the rate base with the customer paying the carrying charges on the capital. The customer benefits from the borrowing at the utility's cost of capital until the time of sale, at which time the value of the improvements is realized as a higher sale price for the house. While the value of such programs must be calculated on an individual basis, the authors feel that many utilities, particularly those that are in a position that makes it difficult to add new conventional capacity, could profit from the implementation of these programs. 1 reference, 2 figures, 6 tables.

Hemphill, R.F. Jr.; Maguire, M.J.

1980-01-01T23:59:59.000Z

354

How Green Will Electricity beHow Green Will Electricity be When Electric Vehicles Arrive?When Electric Vehicles Arrive?  

E-Print Network [OSTI]

How Green Will Electricity beHow Green Will Electricity be When Electric Vehicles Arrive?When Electric Vehicles Arrive? Edward S. Rubin Department of Engineering and Public Policy Department-carbon electricity and plug-in hybrid electric vehicles (PHEVs) ? In light of the above, would adoption of PHEVs

355

Electric power monthly  

SciTech Connect (OSTI)

The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

NONE

1995-08-01T23:59:59.000Z

356

Thermoacoustic magnetohydrodynamic electrical generator  

DOE Patents [OSTI]

A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

Wheatley, J.C.; Swift, G.W.; Migliori, A.

1984-11-16T23:59:59.000Z

357

Thermoacoustic magnetohydrodynamic electrical generator  

DOE Patents [OSTI]

A thermoacoustic magnetohydrodynamic electrical generator includes an intrinsically irreversible thermoacoustic heat engine coupled to a magnetohydrodynamic electrical generator. The heat engine includes an electrically conductive liquid metal as the working fluid and includes two heat exchange and thermoacoustic structure assemblies which drive the liquid in a push-pull arrangement to cause the liquid metal to oscillate at a resonant acoustic frequency on the order of 1,000 Hz. The engine is positioned in the field of a magnet and is oriented such that the liquid metal oscillates in a direction orthogonal to the field of the magnet, whereby an alternating electrical potential is generated in the liquid metal. Low-loss, low-inductance electrical conductors electrically connected to opposite sides of the liquid metal conduct an output signal to a transformer adapted to convert the low-voltage, high-current output signal to a more usable higher voltage, lower current signal.

Wheatley, John C. (Los Alamos, NM); Swift, Gregory W. (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

1986-01-01T23:59:59.000Z

358

Federal Facility Agreement Annual Progress Report for Fiscal Year 1999 Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) EM Program adopted a watershed approach for performing Remedial Investigations (RIs) and characterizations for ORR because it is an effective system for determining the best methods for protecting and restoring aquatic ecosystems and protecting human health. The basic concept is that water quality and ecosystem problems are best solved at the watershed level rather than at the individual water-body or discharger level. The watershed approach requires consideration of all environmental concerns, including needs to protect public health, critical habitats such as wetlands, biological integrity, and surface and ground waters. The watershed approach provides an improved basis for management decisions concerning contaminant sources and containment. It allows more direct focus by stakeholders on achieving ecological goals and water quality standards rather than a measurement of program activities based on numbers of permits or samples. The watershed approach allows better management strategies for investigations, therefore maximizing the utilization of scarce resources. Feasibility studies (FSs) evaluate various alternatives in terms of environmental standards, the protection of human health and the environment, and the costs of implementation to find the optimum solution among them. Society has to decide how much it is willing to spend to meet the standards and to be protective. Conducting FSs is the process of trading off those criteria to pick that optimum point that society wants to achieve. Performing this analysis at the watershed scale allows those trade-offs to be made meaningfully. In addition, a Land Use Control Assurance Plan for the ORR was prepared to identify the strategy for assuring the long-term effectiveness of land use controls. These land use controls will be relied upon to protect human health and the environment at areas of the ORR undergoing remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act and/or the Resource Conservation and Recovery Act. This plan will be implemented by means of a Memorandum of Understanding (MOU) incorporating its terms with the United States EPA and TDEC. The majority of projects described in this report are grouped into five watersheds. They are the East Tennessee Technical Park (ETTP) Watershed (formerly the K-25 Site), the Melton Valley (MV) and Bethel Valley (BV) Watersheds at the Oak Ridge National Laboratory (ORNL), and the Bear Creek Valley (BCV) and Upper East Fork Poplar Creek (UEFPC) Watersheds at the Y-12 Plant.

Bechtel Jacobs Company LLC

2000-01-01T23:59:59.000Z

359

Wind Regimes in Complex Terrain of the Great Valley of Eastern Tennessee  

SciTech Connect (OSTI)

This research was designed to provide an understanding of physical wind mechanisms within the complex terrain of the Great Valley of Eastern Tennessee to assess the impacts of regional air flow with regard to synoptic and mesoscale weather changes, wind direction shifts, and air quality. Meteorological data from 2008 2009 were analyzed from 13 meteorological sites along with associated upper level data. Up to 15 ancillary sites were used for reference. Two-step complete linkage and K-means cluster analyses, synoptic weather studies, and ambient meteorological comparisons were performed to generate hourly wind classifications. These wind regimes revealed seasonal variations of underlying physical wind mechanisms (forced channeled, vertically coupled, pressure-driven, and thermally-driven winds). Synoptic and ambient meteorological analysis (mixing depth, pressure gradient, pressure gradient ratio, atmospheric and surface stability) suggested up to 93% accuracy for the clustered results. Probabilistic prediction schemes of wind flow and wind class change were developed through characterization of flow change data and wind class succession. Data analysis revealed that wind flow in the Great Valley was dominated by forced channeled winds (45 67%) and vertically coupled flow (22 38%). Down-valley pressure-driven and thermally-driven winds also played significant roles (0 17% and 2 20%, respectively), usually accompanied by convergent wind patterns (15 20%) and large wind direction shifts, especially in the Central/Upper Great Valley. The behavior of most wind regimes was associated with detectable pressure differences between the Lower and Upper Great Valley. Mixing depth and synoptic pressure gradients were significant contributors to wind pattern behavior. Up to 15 wind classes and 10 sub-classes were identified in the Central Great Valley with 67 joined classes for the Great Valley at-large. Two-thirds of Great Valley at-large flow was defined by 12 classes. Winds flowed on-axis only 40% of the time. The Great Smoky Mountains helped create down-valley pressure-driven winds, downslope mountain breezes, and divergent air flow. The Cumberland Mountains and Plateau were associated with wind speed reductions in the Central Great Valley, Emory Gap Flow, weak thermally-driven winds, and northwesterly down sloping. Ridge-and-valley terrain enhanced wind direction reversals, pressure-driven winds, as well as locally and regionally produced thermally-driven flow.

Birdwell, Kevin R [ORNL

2011-05-01T23:59:59.000Z

360

2012 National Electricity Forum  

Broader source: Energy.gov (indexed) [DOE]

and Planning, Arizona Public Service * Jan Strack, Grid Planning, Regulatory & Economics Manager, San Diego Gas & Electric * Mario Villar, Vice President, Transmission, NV...

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

362

Capacity Markets for Electricity  

E-Print Network [OSTI]

ternative Approaches for Power Capacity Markets, Papers andprof id=pjoskow. Capacity Markets for Electricity [13]Utility Commission- Capacity Market Questions, available at

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

363

2012 National Electricity Forum  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Development, American Electric Power * John P. Buechler, Executive Regulatory Policy Advisor, New York Independent System Operator * Jim Busbin, Supervisor, Bulk Power, Southern...

364

Integrating Electricity Subsector  

Broader source: Energy.gov (indexed) [DOE]

2013 Electric Power Research Institute, Inc. All rights reserved. This publication is a corporate document that should be cited in the literature in the following manner:...

365

Electricity | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

between two of history's most important energy-related engineers: Thomas Edison and Nikola Tesla. Edison and Tesla's developments in electric power generation and...

366

Joint Electrical Utilities (Iowa)  

Broader source: Energy.gov [DOE]

Cities may establish utilities to acquire existing electric generating facilities or distribution systems. Acquisition, in this statute, is defined as city involvement, and includes purchase, lease...

367

Electric power annual 1992  

SciTech Connect (OSTI)

The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

Not Available

1994-01-06T23:59:59.000Z

368

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Considerations for Curriculum Planning and Computer Engineering Colorado State University Monday, Feb. 20, 2012, 11:00 a.m. Location: LSC 210 Abstract

369

Electricity | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

the current electric grid into the next-generation grid. PE enable utilities to deliver power to their customers effectively while providing increased reliability, security, and...

370

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and fuel consumption In this section, we look at the resources used to produce electricity. Generating units are chosen to run primarily on their operating costs, of which...

371

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wholesale Markets: October 2014 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

372

2012 National Electricity Forum  

Energy Savers [EERE]

of reliability, resource options, wholesale competition and market power, cost of electricity to consumers, environmental quality, or other? Are these consequences so...

373

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wholesale Markets: September 2014 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale...

374

Electrically conductive cellulose composite  

DOE Patents [OSTI]

An electrically conductive cellulose composite includes a cellulose matrix and an electrically conductive carbonaceous material incorporated into the cellulose matrix. The electrical conductivity of the cellulose composite is at least 10 .mu.S/cm at 25.degree. C. The composite can be made by incorporating the electrically conductive carbonaceous material into a culture medium with a cellulose-producing organism, such as Gluconoacetobacter hansenii. The composites can be used to form electrodes, such as for use in membrane electrode assemblies for fuel cells.

Evans, Barbara R.; O'Neill, Hugh M.; Woodward, Jonathan

2010-05-04T23:59:59.000Z

375

Electric Utility Industry Update  

Broader source: Energy.gov [DOE]

Presentationgiven at the April 2012 Federal Utility Partnership Working Group (FUPWG) meetingcovers significant electric industry trends and industry priorities with federal customers.

376

DOE Electricity Advisory Committee  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of the impact and benefit of wide scale use of variable resources including wind and solar power generation on electric power system reliability and greenhouse gas reduction; 3...

377

Perforation patterned electrical interconnects  

DOE Patents [OSTI]

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

Frey, Jonathan

2014-01-28T23:59:59.000Z

378

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

Peterson, M.J.

2005-12-20T23:59:59.000Z

379

Plug-In Electric Vehicle Handbook for Electrical  

E-Print Network [OSTI]

Plug-In Electric Vehicle Handbook for Electrical Contractors #12;Plug-In Electric Vehicle Handbook Infrastructure Installing plug-in electric vehicle (PEV) charg- ing infrastructure requires unique knowledge Thanks to the Electric Vehicle Infrastructure Training Program for assisting with the production

380

INDEPENDENT VERIFICATION SURVEY REPORT FOR EXPOSURE UNITS Z2-24, Z2-31, Z2-32, AND Z2-36 IN ZONE 2 OF THE EAST TENNESSEE TECHNOLOGY PARK OAK RIDGE, TENNESSEE  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management selected Oak Ridge Associated Universities (ORAU), through the Oak Ridge Institute for Science and Education (ORISE) contract, to perform independent verification (IV) at Zone 2 of the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. ORAU has concluded IV surveys, per the project-specific plan (PSP) (ORAU 2013a) covering exposure units (EUs) Z2-24, -31, -32, and -36. The objective of this effort was to verify the following. Target EUs comply with requirements in the Zone 2 Record of Decision (ROD) (DOE 2005), as implemented by using the dynamic verification strategy presented in the dynamic work plan (DWP) (BJC 2007) Commitments in the DWP were adequately implemented, as verified via IV surveys and soil sampling The Zone 2 ROD establishes maximum remediation level (RLmax) values and average RL (RLavg) values for the primary contaminants of concern (COCs) U-234, U-235, U-238, Cs-137, Np-237, Ra-226, Th-232, arsenic, mercury, and polychlorinated biphenyls (PCBs). Table 1.1 lists Zone 2 COCs with associated RLs. Additional radiological and chemical contaminants were also identified during past characterization and monitoring actions, though the ROD does not present RLs for these potential contaminants. IV activities focused on the identification and quantification of ROD-specific COCs in surface soils, but also generated data for other analytes to support future decisions. ORAU personnel also reviewed EU-specific phased construction completion reports (PCCRs) to focus IV activities and identify potential judgmental sample locations, if any.

none,

2013-10-10T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Electricity Real Options Valuation  

E-Print Network [OSTI]

In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

Ewa Broszkiewicz-Suwaj

2006-08-16T23:59:59.000Z

382

Electricity Real Options Valuation  

E-Print Network [OSTI]

In this paper a real option approach for the valuation of real assets is presented. Two continuous time models used for valuation are described: geometric Brownian motion model and interest rate model. The valuation for electricity spread option under Vasicek interest model is placed and the formulas for parameter estimators are calculated. The theoretical part is confronted with real data from electricity market.

Broszkiewicz-Suwaj, E

2006-01-01T23:59:59.000Z

383

Electrical shock accident investigation  

SciTech Connect (OSTI)

This report documents results of the accident investigation of an electrical shock received by two subcontractor employees on May 13, 1994, at the Pinellas Plant. The direct cause of the electrical shock was worker contact with a cut ``hot`` wire and a grounded panelboard (PPA) enclosure. Workers presumed that all wires in the enclosure were dead at the time of the accident and did not perform thorough Lockout/Tagout (LO/TO). Three contributing causes were identified. First, lack of guidance in the drawing for the modification performed in 1987 allowed the PPA panel to be used as a junction box. The second contributing cause is that Environmental, Safety and Health (ES&H) procedures do not address multiple electrical sources in an enclosure. Finally, the workers did not consider the possibility of multiple electrical sources. The root cause of the electrical shock was the inadequacy of administrative controls, including construction requirement and LO/TO requirements, and subcontractor awareness regarding multiple electrical sources. Recommendations to prevent further reoccurrence of this type of accident include revision of ES&H Standard 2.00, Electrical Safety Program Manual, to document requirements for multiple electrical sources in a single enclosure to specify a thorough visual inspection as part of the voltage check process. In addition, the formality of LO/TO awareness training for subcontractor electricians should be increased.

Not Available

1994-09-30T23:59:59.000Z

384

Hawaii electric system reliability.  

SciTech Connect (OSTI)

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

385

Electrical Demand Control  

E-Print Network [OSTI]

Almost every building owner or manager is interested in controlling electrical costs. Since the HVAC system is a large user of electricity, this article will discuss what can be done in the HVAC system to influence parts of the utility bill....

Eppelheimer, D. M.

1984-01-01T23:59:59.000Z

386

Superconductivity for Electric Systems  

E-Print Network [OSTI]

1 Superconductivity for Electric Systems Superconductivity Program Quarterly Progress Report For the Period October 1, 2006, to December 31, 2006 #12;2 Superconductivity Program Quarterly Progress Report Superconductivity Program Oak Ridge National Laboratory For U.S. Department of Energy Office of Electricity Delivery

387

Superconductivity for Electric Systems  

E-Print Network [OSTI]

Superconductivity for Electric Systems Superconductivity Program Quarterly Progress Report For the Period January 1, 2007 to March 31, 2007 #12;2 Superconductivity Program Quarterly Progress Report Superconductivity Program Oak Ridge National Laboratory For: Department of Energy Office of Electricity Delivery

388

Superconductivity for Electric Systems  

E-Print Network [OSTI]

Superconductivity for Electric Systems Superconductivity Program Quarterly Progress Report For the Period April 1, 2007, to June 30, 2007 #12;2 Superconductivity Program Quarterly Progress Report Superconductivity Program Oak Ridge National Laboratory For: Department of Energy Office of Electricity Delivery

389

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It is being presented at the Utility Variable-Generation Integration Group Fall Technical Workshop on October 24, 2012.

Hand, M.

2012-10-01T23:59:59.000Z

390

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in a Power Systems Engineering Research Center webinar on September 4, 2012.

Mai, T.

2012-08-01T23:59:59.000Z

391

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in an Union of Concerned Scientists webinar on June 12, 2012.

Hand, M.; Mai, T.

2012-08-01T23:59:59.000Z

392

Energy 101: Electric Vehicles  

ScienceCinema (OSTI)

This edition of Energy 101 highlights the benefits of electric vehicles, including improved fuel efficiency, reduced emissions, and lower maintenance costs. For more information on electric vehicles from the Office of Energy Efficiency and Renewable Energy, visit the Vehicle Technologies Program website: http://www1.eere.energy.gov/vehiclesandfuels/

None

2013-05-29T23:59:59.000Z

393

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented in a webinar given by the California Energy Commission.

Hand, M. M.

2012-08-01T23:59:59.000Z

394

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. This presentation was presented in a Wind Powering America webinar on August 15, 2012 and is now available through the Wind Powering America website.

Mai, T.

2012-08-01T23:59:59.000Z

395

ELECTRICAL ENGINEERING Curriculum Notes  

E-Print Network [OSTI]

choices. Replace MAT 521 (Probability and Statistics 3 credits) with CIS 321 (Intro. to Probability Engineering and Computer Science there are four tracks in electrical engineering. Communications Track: ELEELECTRICAL ENGINEERING Curriculum Notes 2013-2014 1. Electrical Engineering (EE) students must

Mather, Patrick T.

396

Electric turbocompound control system  

DOE Patents [OSTI]

Turbocompound systems can be used to affect engine operation using the energy in exhaust gas that is driving the available turbocharger. A first electrical device acts as a generator in response to turbocharger rotation. A second electrical device acts as a motor to put mechanical power into the engine, typically at the crankshaft. Apparatus, systems, steps, and methods are described to control the generator and motor operations to control the amount of power being recovered. This can control engine operation closer to desirable parameters for given engine-related operating conditions compared to actual. The electrical devices can also operate in "reverse," going between motor and generator functions. This permits the electrical device associated with the crankshaft to drive the electrical device associated with the turbocharger as a motor, overcoming deficient engine operating conditions such as associated with turbocharger lag.

Algrain, Marcelo C. (Dunlap, IL)

2007-02-13T23:59:59.000Z

397

Electric power monthly  

SciTech Connect (OSTI)

The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

Not Available

1992-05-01T23:59:59.000Z

398

COMPARISON OF RESULTS FOR QUARTER 5 SURFACE WATER SPLIT SAMPLES COLLECTED AT THE NUCLEAR FUEL SERVICES SITE ERWIN TENNESSEE  

SciTech Connect (OSTI)

Oak Ridge Associated Universities (ORAU), under the Oak Ridge Institute for Science and Education (ORISE) contract, collected split surface water samples with Nuclear Fuel Services (NFS) representatives on August 21, 2013. Representatives from the U.S. Nuclear Regulatory Commission (NRC) and the Tennessee Department of Environment and Conservation were also in attendance. Samples were collected at four surface water stations, as required in the approved Request for Technical Assistance number 11-018. These stations included Nolichucky River upstream (NRU), Nolichucky River downstream (NRD), Martin Creek upstream (MCU), and Martin Creek downstream (MCD). Both ORAU and NFS performed gross alpha and gross beta analyses, and the comparison of results using the duplicate error ratio (DER), also known as the normalized absolute difference, are tabulated. All DER values were less than 3 and results are consistent with low (e.g., background) concentrations.

none,

2013-09-23T23:59:59.000Z

399

electricAl engineering College of Engineering and Mines  

E-Print Network [OSTI]

encompasses telecommunica- tions, electrical power generation, transmission and distribution, control systems power engineers design and oversee the construction, installation and maintenance of electrical systems modern power electronic devices to control power generation and distribution and build electric drives

Hartman, Chris

400

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network [OSTI]

Designing Markets for Electricity, Wiley-IEEE Press. CEC (in Major Drivers in U.S. Electricity Markets, NREL/CP-620-and fuel efficiency and electricity demand assumptions used

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Electricity Grid: Impacts of Plug-In Electric Vehicle Charging  

E-Print Network [OSTI]

mail: ccyang@ucdavis.edu. Electricity Grid Impacts of Plug-by either gasoline or electricity, but unlike hybrids, PHEVsto use very low-carbon electricity resources, such as

Yang, Christopher; McCarthy, Ryan

2009-01-01T23:59:59.000Z

402

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network [OSTI]

problems, Electric Power Systems Research, 73(2): p. 169-problems, Electric Power Systems Research, 77(3-4): p. 212-decomposition, Electric Power Systems Research, 77(7): p.

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

403

Plug-In Electric Vehicle Handbook for Electrical Contractors (Brochure)  

SciTech Connect (OSTI)

This handbook answers basic questions about plug-in electric vehicles, charging stations, charging equipment, charging equipment installation, and training for electrical contractors.

Not Available

2012-04-01T23:59:59.000Z

404

ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM EET 105: ELECTRICAL SYSTEMS  

E-Print Network [OSTI]

1 ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM EET 105: ELECTRICAL SYSTEMS Instructor: Albert LozanoF) - Value of capacitors: -Printed on body of capacitor (physically large capacitors) -Code (useless) -If

Lozano-Nieto, Albert

405

ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM EET 105 ELECTRICAL SYSTEMS  

E-Print Network [OSTI]

ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM EET 105 ­ ELECTRICAL SYSTEMS LABORATORY EXPERIENCES will become familiar with solar cells as photovoltaic energy converters. Secondly, students will practice

Lozano-Nieto, Albert

406

The electric organ discharge (EOD) of weakly electric fish generates transcutaneous electric currents that stimulate  

E-Print Network [OSTI]

2443 The electric organ discharge (EOD) of weakly electric fish generates transcutaneous electric object whose conductivity is different from that of water produces an electric image consisting for the formation of electric images. Rule 1: objects more conductive than water cause a local increase

Grant, Kirsty

407

North American Electric Reliability Corporation Interconnections...  

Office of Environmental Management (EM)

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

408

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

409

Electrical Contacts to Individual Colloidal Semiconductor Nanorods  

E-Print Network [OSTI]

stable nanostructured electrical devices with interestingElectrical Contacts to Individual Colloidal Semiconductorand its effect on electrical properties has important

Trudeau, Paul-Emile

2008-01-01T23:59:59.000Z

410

Electricity Advisory Committee - Federal Register Notices | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Register Notices Electricity Advisory Committee - Federal Register Notices Electricity Advisory Committee - Federal Register Notices September 3, 2014 Electricity Advisory...

411

THE ELECTRIC PROGRAM INVESTMENT CHARGE  

E-Print Network [OSTI]

THE ELECTRIC PROGRAM INVESTMENT CHARGE: PROPOSED 201214 TRIENNIAL INVESTMENT PLAN The California Energy Commission has prepared this triennial investment plan (2012 ­ 2014) for the new Electric, 2012, Phase 2 Decision 1205037. This decision established the Electric Program Investment Charge

412

Electricity Restructuring: Deregulation or Reregulation?  

E-Print Network [OSTI]

PWP-074 Electricity Restructuring: Deregulation or Reregulation? Severin Borenstein and James;1 Electricity Restructuring: Deregulation or Reregulation? Severin Borenstein and James Bushnell1 Forthcoming from the experience with electricity restructuring to date. The gains from restructuring are most

California at Berkeley. University of

413

The Gas/Electric Partnership  

E-Print Network [OSTI]

The electric and gas industries are each in the process of restructuring and "converging" toward one mission: providing energy. Use of natural gas in generating electric power and use of electricity in transporting natural gas will increase...

Schmeal, W. R.; Royall, D.; Wrenn, K. F. Jr.

414

Atoms to electricity. [Booklet  

SciTech Connect (OSTI)

This booklet explains the basic technology of nuclear fission power reactors, the nuclear fuel cycle and the role of nuclear energy as one of the domestic energy resources being developed to help meet our national energy demand. Nuclear power accounted for over 16 percent of the US electric energy supply in 1986 and was second only to coal as a source of our electric power. In the 1990s, nuclear energy is expected to provide almost 20 percent of the Nation's electricity. 38 figs., 5 tabs.

Not Available

1987-11-01T23:59:59.000Z

415

Atoms to electricity  

SciTech Connect (OSTI)

This booklet explains the basic technology of nuclear fission power reactors, the nuclear fuel cycle and the role of nuclear energy as one of the domestic energy resources being developed to help meet our national energy demand. Nuclear power accounted for some 12 percent of the US electric energy supply in 1982. In the 1990's, it is expected to become second only to coal as a source of our electric power, almost doubling its present contribution to our national electricity supply. 14 references, 40 figures, 5 tables.

Not Available

1983-11-01T23:59:59.000Z

416

Thermionic electric converter  

SciTech Connect (OSTI)

A thermionic electric converter is disclosed wherein an externally located heat source causes electrons to be boiled off an electron emissive surface interiorly positioned on one end wall of an evacuated cylindrical chamber. The electrons are electrically focused and accelerated through the interior of an air core induction coil located within a transverse magnetic field, and subsequently are collected on the other end wall of the chamber functioning as a collecting plate. The emf generated in the induction coil by action of the transiting electron stream interacting with the transverse magnetic field is applied to an external circuit to perform work, thereby implementing a direct heat energy to electrical energy conversion.

Davis, E.D.

1981-12-01T23:59:59.000Z

417

BEEST: Electric Vehicle Batteries  

SciTech Connect (OSTI)

BEEST Project: The U.S. spends nearly a $1 billion per day to import petroleum, but we need dramatically better batteries for electric and plug-in hybrid vehicles (EV/PHEV) to truly compete with gasoline-powered cars. The 10 projects in ARPA-Es BEEST Project, short for Batteries for Electrical Energy Storage in Transportation, could make that happen by developing a variety of rechargeable battery technologies that would enable EV/PHEVs to meet or beat the price and performance of gasoline-powered cars, and enable mass production of electric vehicles that people will be excited to drive.

None

2010-07-01T23:59:59.000Z

418

Electric-Drive Vehicle Basics (Brochure)  

SciTech Connect (OSTI)

Describes the basics of electric-drive vehicles, including hybrid electric vehicles, plug-in hybrid electric vehicles, all-electric vehicles, and the various charging options.

Not Available

2011-04-01T23:59:59.000Z

419

Tennessee Energy and Cost Savings for New Single- and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC  

SciTech Connect (OSTI)

The 2009 and 2012 International Energy Conservation Codes (IECC) yield positive benefits for Tennessee homeowners. Moving to either the 2009 or 2012 IECC from the 2006 IECC is cost effective over a 30-year life cycle. On average, Tennessee homeowners will save $1,809 over 30 years under the 2009 IECC, with savings still higher at $6,102 with the 2012 IECC. After accounting for upfront costs and additional costs financed in the mortgage, homeowners should see net positive cash flows (i.e., cumulative savings exceeding cumulative cash outlays) in 1 year for both the 2009 and 2012 IECC. Average annual energy savings are $123 for the 2009 IECC and $415 for the 2012 IECC.

Lucas, Robert G.; Taylor, Zachary T.; Mendon, Vrushali V.; Goel, Supriya

2012-06-15T23:59:59.000Z

420

Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program  

SciTech Connect (OSTI)

This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

Dennis, C.; Stefano, J.

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

422

Electricity Monthly Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

marketers to compete to serve customers and these competitive retail suppliers offer electricity at a market-based price. Retail rates and prices are not collected by EIA. EIA...

423

Retail electricity competition  

E-Print Network [OSTI]

We analyze a number of unstudied aspects of retail electricity competition. We first explore the implications of load profiling of consumers whose traditional meters do not allow for measurement of their real time consumption, ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

424

Electrical Engineer (Litigation)  

Broader source: Energy.gov [DOE]

This position is located in the Office of Administrative Litigation (OAL). As the Commissions trial staff, OAL seeks to assist entities such as electric utilities, natural gas pipelines and...

425

Generating electricity from viruses  

SciTech Connect (OSTI)

Berkeley Lab's Seung-Wuk Lee discusses "Generating electricity from viruses" in this Oct. 28, 2013 talk, which is part of a Science at the Theater event entitled Eight Big Ideas.

Lee, Seung-Wuk

2013-10-31T23:59:59.000Z

426

Electricity Advisory Committee  

Broader source: Energy.gov (indexed) [DOE]

Presentation on U.S. Department of Energy's Vision of a Future Grid Bill Parks, Senior Advisor, DOE Office Electricity Delivery and Energy Reliability 3:15 - 3:30 pm Break 3:30 -...

427

Micromachined electrical cauterizer  

DOE Patents [OSTI]

A micromachined electrical cauterizer is disclosed. Microstructures are combined with microelectrodes for highly localized electro cauterization. Using boron etch stops and surface micromachining, microneedles with very smooth surfaces are made. Micromachining also allows for precision placement of electrodes by photolithography with micron sized gaps to allow for concentrated electric fields. A microcauterizer is fabricated by bulk etching silicon to form knife edges, then parallelly placed microelectrodes with gaps as small as 5 {mu}m are patterned and aligned adjacent the knife edges to provide homeostasis while cutting tissue. While most of the microelectrode lines are electrically insulated from the atmosphere by depositing and patterning silicon dioxide on the electric feedthrough portions, a window is opened in the silicon dioxide to expose the parallel microelectrode portion. This helps reduce power loss and assist in focusing the power locally for more efficient and safer procedures. 7 figs.

Lee, A.P.; Krulevitch, P.A.; Northrup, M.A.

1999-08-31T23:59:59.000Z

428

Micromachined electrical cauterizer  

DOE Patents [OSTI]

A micromachined electrical cauterizer. Microstructures are combined with microelectrodes for highly localized electro cauterization. Using boron etch stops and surface micromachining, microneedles with very smooth surfaces are made. Micromachining also allows for precision placement of electrodes by photolithography with micron sized gaps to allow for concentrated electric fields. A microcauterizer is fabricated by bulk etching silicon to form knife edges, then parallelly placed microelectrodes with gaps as small as 5 .mu.m are patterned and aligned adjacent the knife edges to provide homeostasis while cutting tissue. While most of the microelectrode lines are electrically insulated from the atmosphere by depositing and patterning silicon dioxide on the electric feedthrough portions, a window is opened in the silicon dioxide to expose the parallel microelectrode portion. This helps reduce power loss and assist in focusing the power locally for more efficient and safer procedures.

Lee, Abraham P. (Walnut Creek, CA); Krulevitch, Peter A. (Pleasanton, CA); Northrup, M. Allen (Berkeley, CA)

1999-01-01T23:59:59.000Z

429

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

ELECTRICAL & COMPUTER ENGINEERING SEMINAR "Restoration of Soft X-Ray Laser Images of Nanostructures for restoration of images obtained with the 46.9 nm soft x-ray (SXR) laser microscope will be presented. We

430

Generating electricity from viruses  

ScienceCinema (OSTI)

Berkeley Lab's Seung-Wuk Lee discusses "Generating electricity from viruses" in this Oct. 28, 2013 talk, which is part of a Science at the Theater event entitled Eight Big Ideas.

Lee, Seung-Wuk

2014-06-23T23:59:59.000Z

431

Electric current locator  

DOE Patents [OSTI]

The disclosure herein provides an apparatus for location of a quantity of current vectors in an electrical device, where the current vector has a known direction and a known relative magnitude to an input current supplied to the electrical device. Mathematical constants used in Biot-Savart superposition equations are determined for the electrical device, the orientation of the apparatus, and relative magnitude of the current vector and the input current, and the apparatus utilizes magnetic field sensors oriented to a sensing plane to provide current vector location based on the solution of the Biot-Savart superposition equations. Description of required orientations between the apparatus and the electrical device are disclosed and various methods of determining the mathematical constants are presented.

King, Paul E. (Corvallis, OR); Woodside, Charles Rigel (Corvallis, OR)

2012-02-07T23:59:59.000Z

432

Electrically conductive material  

DOE Patents [OSTI]

An electrically conductive material for use in solid oxide fuel cells, electrochemical sensors for combustion exhaust, and various other applications possesses increased fracture toughness over available materials, while affording the same electrical conductivity. One embodiment of the sintered electrically conductive material consists essentially of cubic ZrO.sub.2 as a matrix and 6-19 wt. % monoclinic ZrO.sub.2 formed from particles having an average size equal to or greater than about 0.23 microns. Another embodiment of the electrically conductive material consists essentially at cubic ZrO.sub.2 as a matrix and 10-30 wt. % partially stabilized zirconia (PSZ) formed from particles having an average size of approximately 3 microns.

Singh, Jitendra P. (Bollingbrook, IL); Bosak, Andrea L. (Burnam, IL); McPheeters, Charles C. (Woodridge, IL); Dees, Dennis W. (Woodridge, IL)

1993-01-01T23:59:59.000Z

433

Electrically conductive material  

DOE Patents [OSTI]

An electrically conductive material is described for use in solid oxide fuel cells, electrochemical sensors for combustion exhaust, and various other applications possesses increased fracture toughness over available materials, while affording the same electrical conductivity. One embodiment of the sintered electrically conductive material consists essentially of cubic ZrO[sub 2] as a matrix and 6-19 wt. % monoclinic ZrO[sub 2] formed from particles having an average size equal to or greater than about 0.23 microns. Another embodiment of the electrically conductive material consists essentially at cubic ZrO[sub 2] as a matrix and 10-30 wt. % partially stabilized zirconia (PSZ) formed from particles having an average size of approximately 3 microns. 8 figures.

Singh, J.P.; Bosak, A.L.; McPheeters, C.C.; Dees, D.W.

1993-09-07T23:59:59.000Z

434

Electrical and Computer Engineering  

E-Print Network [OSTI]

technologies such as solar power and solid state (LED) lighting; Design sensors that measure glucose, generating and transmitting power, and designing smart sensors for robots. Circuits Communications Optics Power Sensors Signal & Image Processing #12;Electrical Engineering Develop environmentally friendly

Weber, Rodney

435

Electricity Advisory Committee Meeting  

Broader source: Energy.gov (indexed) [DOE]

Officer 1:30 to 2:00 pm Update on the U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability's (OE) 2013 Programs and Initiatives Honorable...

436

Electricity Advisory Committee Meeting  

Broader source: Energy.gov (indexed) [DOE]

Official 2:30 to 2:50 pm Update on the U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability's (OE) 2012 Current Programs and Initiatives -...

437

Singing the Brain Electric  

E-Print Network [OSTI]

Singing the Brain Electric Brain pacemakers, scientists have found, can treat depression by correcting neural circuitry gone haywire. This thesis examines how such technology - a technique known as deep-brain stimulation, ...

Chua, Grace (Grace W. J.)

2008-01-01T23:59:59.000Z

438

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

a Ph.D. degree in electrical engineering from INRIA, France, in 1993. Meyer worked on the thermonuclear fusion program of the French Nuclear Energy Agency during his military service. He is currently

439

ELECTRICAL & COMPUTER ENGINEERING  

E-Print Network [OSTI]

, advised by Professor Robert Calderbank. She received her B.Eng. and M.A. in Electrical Engineering from a Roberto Padovani Scholarship for her work. She also won a Best Student Paper Award at ICASSP 2012. Her

440

Ion electric propulsion unit  

DOE Patents [OSTI]

An electron cyclotron resonance (ECR) thruster is disclosed having a plasma chamber which is electrically biased with a positive voltage. The chamber bias serves to efficiently accelerate and expel the positive ions from the chamber. Electrons follow the exiting ions, serving to provide an electrically neutral exhaust plume. In a further embodiment, a downstream shaping magnetic field serves to further accelerate and/or shape the exhaust plume.

Light, Max E; Colestock, Patrick L

2014-01-28T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Electric power annual 1993  

SciTech Connect (OSTI)

This report presents a summary of electric power industry statistics at national, regional, and state levels: generating capability and additions, net generation, fossil-fuel statistics, retail sales and revenue, finanical statistics, environmental statistics, power transactions, demand side management, nonutility power producers. Purpose is to provide industry decisionmakers, government policymakers, analysts, and the public with historical data that may be used in understanding US electricity markets.

Not Available

1994-12-08T23:59:59.000Z

442

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented to the 2012 Western Conference of Public Service Commissioners, during their June, 2012, meeting. The Western Conference of Public Service Commissioners is a regional association within the National Association of Regulatory Utility Commissioners (NARUC).

Hand, M. M.

2012-08-01T23:59:59.000Z

443

Accomodating Electric Vehicles  

E-Print Network [OSTI]

Accommodating Electric Vehicles Dave Aasheim 214-551-4014 daasheim@ecotality.com A leader in clean electric transportation and storage technologies ECOtality North America Overview Today ? Involved in vehicle electrification... ECOtality North America Overview Today ?Warehouse Material Handling ? Lift trucks ? Pallet Jacks ? Over 200 Customers ? Over 5,000 Installations ECOtality North America Overview Today ? 1990?s involved in EV1 ? EV Chargers ? Vehicle & battery...

Aasheim, D.

2011-01-01T23:59:59.000Z

444

Voluntary Agreements to Improve Environmental Quality: Are late joiners the free riders?  

E-Print Network [OSTI]

Electric Cooperative Association, Large Public Power Council and Tennessee Valley Authority. future greenhouse gas regulations.

Delmas, Magali A; Montes, Maria J.

2007-01-01T23:59:59.000Z

445

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network [OSTI]

fuel carbon intensity. . 8a function of the lifecycle carbon intensity of electricityCarbon Intensity

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

446

Electric Power Controller for Steering Wheel Management in Electric Cars  

E-Print Network [OSTI]

Electric Power Controller for Steering Wheel Management in Electric Cars Vicente Milanés, Joshué-- Autonomous vehicles, Power control, System analysis and design, Intelligent transportation systems. I they are named hydraulic power steering (HPS) systems. If an electric motor is used then they are named electric

Paris-Sud XI, Université de

447

@BristolUniLib bristol.ac.uk/library Get more from the catalogue  

E-Print Network [OSTI]

importing into EndNote. Advanced search techniques These can be used when entering search terms in Basic search term(s) into one or more of the five boxes and choose Words adjacent to search enter lower or upper case letters for the same result. You can also search for a phrase by enclosing

Bristol, University of

448

@BristolUniLib bristol.ac.uk/library MetaLib: quick guide  

E-Print Network [OSTI]

the Search or Multi-field search option by clicking on the tab provided. 4) Enter your search term(s to log in with your UOB username and password. The Login link appears on the Cross- search, Find database, Find eJournal, and My space pages. `Guests', who do not log in, will not be able to search databases

Bristol, University of

449

Chapter 20: Electric Potential and Electric Potential Energy  

E-Print Network [OSTI]

1 Chapter 20: Electric Potential and Electric Potential Energy 2. A 4.5 C charge moves in a uniform electric field ( )5 ^4.1 10 N/C= E x . The change in electric potential energy of a charge that moves against an electric field is given by equation 20-1, 0U q Ed = . If the charge moves in the same

Kioussis, Nicholas

450

Electric-Drive Vehicle engineering  

E-Print Network [OSTI]

Electric-Drive Vehicle engineering COLLEGE of ENGINEERING Electric-drive engineers for 80 years t Home to nation's first electric-drive vehicle engineering program and alternative-credit EDGE Engineering Entrepreneur Certificate Program is a great addition to an electric-drive vehicle

Berdichevsky, Victor

451

Electric dipole two equal magnitude,  

E-Print Network [OSTI]

Electric dipole ­ two equal magnitude, opposite charged particles separated by distance d What's the electric field at point P due to the dipole? Electric Dipole #12;Approximate E field for a dipole is Define electric dipole moment, p as, The direction of p and d is from the negative to positive E field along

Bertulani, Carlos A. - Department of Physics and Astronomy, Texas A&M University

452

Electrical Impedance Tomography Liliana Borcea  

E-Print Network [OSTI]

Electrical Impedance Tomography Liliana Borcea #3; September 3, 2002 Abstract We review theoretical and numerical studies of the inverse problem of electrical impedance tomography which seeks the electrical conductivity and permittivity inside a body, given simul- taneous measurements of electrical currents

Borcea, Liliana

453

Electric sales and revenue 1996  

SciTech Connect (OSTI)

Information is provided on electricity sales, associated revenue, average revenue per kilowatthour sold, and number of consumers throughout the US. The data provided in the Electric Sales and Revenue are presented at the national, Census division, State, and electric utility levels. The information is based on annual data reported by electric utilities for the calendar year ending December 31, 1996. 16 figs., 20 tabs.

NONE

1997-12-01T23:59:59.000Z

454

LABORATORY VI ELECTRICITY FROM MAGNETISM  

E-Print Network [OSTI]

LABORATORY VI ELECTRICITY FROM MAGNETISM Lab VI - 1 In the previous problems you explored the magnetic field and its effect on moving charges. You also saw how electric currents could create magnetic can give rise to electric currents. This is the effect that allows the generation of electricity

Minnesota, University of

455

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

456

Electric sales and revenue 1997  

SciTech Connect (OSTI)

The Electric Sales and Revenue is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. Information is provided on electricity sales, associated revenue, average revenue per kilowatthour sold, and number of consumers throughout the US. The data provided in the Electric Sales and Revenue are presented at the national, Census division, State, and electric utility levels. The information is based on annual data reported by electric utilities for the calendar year ending December 31, 1997. 16 figs., 17 tabs.

NONE

1998-10-01T23:59:59.000Z

457

Electric sales and revenue 1994  

SciTech Connect (OSTI)

The Electric Sales and Revenue is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. Information is provided on electricity sales, associated revenue, average revenue per kilowatthour sold, and number of consumers throughout the United States. The data provided in the Electric Sales and Revenue are presented at the national, Census division, State, and electric utility levels. The information is based on annual data reported by electric utilities for the calendar year ending December 31, 1994.

NONE

1995-11-01T23:59:59.000Z

458

Liquid metal thermal electric converter  

DOE Patents [OSTI]

A liquid metal thermal electric converter which converts heat energy to electrical energy. The design of the liquid metal thermal electric converter incorporates a unique configuration which directs the metal fluid pressure to the outside of the tube which results in the structural loads in the tube to be compressive. A liquid metal thermal electric converter refluxing boiler with series connection of tubes and a multiple cell liquid metal thermal electric converter are also provided.

Abbin, Joseph P. (Albuquerque, NM); Andraka, Charles E. (Albuquerque, NM); Lukens, Laurance L. (Albuquerque, NM); Moreno, James B. (Albuquerque, NM)

1989-01-01T23:59:59.000Z

459

Geologic Controls of Hydrocarbon Occurrence in the Appalachian Basin in Eastern Tennessee, Southwestern Virginia, Eastern Kentucky, and Southern West Virginia  

SciTech Connect (OSTI)

This report summarizes the accomplishments of a three-year program to investigate the geologic controls of hydrocarbon occurrence in the southern Appalachian basin in eastern Tennessee, southwestern Virginia, eastern Kentucky, and southern West Virginia. The project: (1) employed the petroleum system approach to understand the geologic controls of hydrocarbons; (2) attempted to characterize the P-T parameters driving petroleum evolution; (3) attempted to obtain more quantitative definitions of reservoir architecture and identify new traps; (4) is worked with USGS and industry partners to develop new play concepts and geophysical log standards for subsurface correlation; and (5) geochemically characterized the hydrocarbons (cooperatively with USGS). Third-year results include: All project milestones have been met and addressed. We also have disseminated this research and related information through presentations at professional meetings, convening a major workshop in August 2003, and the publication of results. Our work in geophysical log correlation in the Middle Ordovician units is bearing fruit in recognition that the criteria developed locally in Tennessee and southern Kentucky are more extendible than anticipated earlier. We have identified a major 60 mi-long structure in the western part of the Valley and Ridge thrust belt that has been successfully tested by a local independent and is now producing commercial amounts of hydrocarbons. If this structure is productive along strike, it will be one of the largest producing structures in the Appalachians. We are completing a more quantitative structural reconstruction of the Valley and Ridge and Cumberland Plateau than has been made before. This should yield major dividends in future exploration in the southern Appalachian basin. Our work in mapping, retrodeformation, and modeling of the Sevier basin is a major component of the understanding of the Ordovician petroleum system in this region. Prior to our undertaking this project, this system was the least understood in the Appalachian basin. This project, in contrast to many if not most programs undertaken in DOE laboratories, has a major educational component wherein three Ph.D. students have been partially supported by this grant, one M.S. student partially supported, and another M.S. student fully supported by the project. These students will be well prepared for professional careers in the oil and gas industry.

Hatcher, Robert D

2005-11-30T23:59:59.000Z

460

Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including short descriptions of the facility, the hydrogeologic setting, CERCLA decision document requirements for environmental monitoring, and a summary of the EMWMF monitoring history to date. Sect. 3 identifies the respective groundwater, surface water, stormwater, and air monitoring locations at the EMWMF and outlines the associated sampling frequencies, field measurements, and laboratory analytes. Sect. 4 presents a concise technical evaluation of the groundwater, surface water, stormwater, and air monitoring data. Sect. 5 summarizes key monitoring results and data evaluation conclusions along with any recommended changes to groundwater, surface water, stormwater, or air monitoring at the EMWMF. Sect. 6 lists the documents and other technical reports referenced in the preceding narrative sections. Maps and other illustrations referenced in the narrative sections of this annual EMR are in Appendix A. Referenced summary tables of FY 2009 environmental monitoring data are in Appendix B (Groundwater), Appendix C (Surface Water), Appendix D (Stormwater), and Appendix E (Ambient Air).

Walker J.R.

2010-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Spring 2001 1 ountain PromisM e  

E-Print Network [OSTI]

about rolling blackouts and strapped power companies in California, I wonder how and why utility timber residues from logging operations; hydroelectricity; and solar electricity. Tennessee Tennessee

Baltisberger, Jay H.

462

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

Tennessee at 8 megawatts, began operations in Chattanooga in February 2014. Average site electricity consumption for Tennessee households is 33 percent higher than the national...

463

Geologic Controls of Hydrocarbon Occurrence in the Southern Appalachian Basin in Eastern Tennessee, Southwestern Virginia, Eastern Kentucky, and Southern West Virginia  

SciTech Connect (OSTI)

This report summarizes the first-year accomplishments of a three-year program to investigate the geologic controls of hydrocarbon occurrence in the southern Appalachian basin in eastern Tennessee, southwestern Virginia, eastern Kentucky, and southern West Virginia. The project: (1) employs the petroleum system approach to understand the geologic controls of hydrocarbons; (2) attempts to characterize the T-P parameters driving petroleum evolution; (3) attempts to obtain more quantitative definitions of reservoir architecture and identify new traps; (4) is working with USGS and industry partners to develop new play concepts and geophysical log standards for subsurface correlation; and (5) is geochemically characterizing the hydrocarbons (cooperatively with USGS). First-year results include: (1) meeting specific milestones (determination of thrust movement vectors, fracture analysis, and communicating results at professional meetings and through publication). All milestones were met. Movement vectors for Valley and Ridge thrusts were confirmed to be west-directed and derived from pushing by the Blue Ridge thrust sheet, and fan about the Tennessee salient. Fracture systems developed during Paleozoic, Mesozoic, and Cenozoic to Holocene compressional and extensional tectonic events, and are more intense near faults. Presentations of first-year results were made at the Tennessee Oil and Gas Association meeting (invited) in June, 2003, at a workshop in August 2003 on geophysical logs in Ordovician rocks, and at the Eastern Section AAPG meeting in September 2003. Papers on thrust tectonics and a major prospect discovered during the first year are in press in an AAPG Memoir and published in the July 28, 2003, issue of the Oil and Gas Journal. (2) collaboration with industry and USGS partners. Several Middle Ordovician black shale samples were sent to USGS for organic carbon analysis. Mississippian and Middle Ordovician rock samples were collected by John Repetski (USGS) and RDH for conodont alteration index determination to better define regional P-T conditions. Efforts are being made to calibrate and standardize geophysical log correlation, seismic reflection data, and Ordovician lithologic signatures to better resolve subsurface stratigraphy and structure beneath the poorly explored Plateau in Tennessee and southern Kentucky. We held a successful workshop on Ordovician rocks geophysical log correlation August 7, 2003 that was cosponsored by the Appalachian PTTC, the Kentucky and Tennessee geological surveys, the Tennessee Oil and Gas Association, and small independents. Detailed field structural and stratigraphic mapping of a transect across part of the Ordovician clastic wedge in Tennessee was begun in January 2003 to assist in 3-D reconstruction of part of the southern Appalachian basin and better assess the nature of a major potential source rock assemblage. (3) Laying the groundwork through (1) and (2) to understand reservoir architecture, the petroleum systems, ancient fluid migration, and conduct 3-D analysis of the southern Appalachian basin.

Robert D. Hatcher

2003-05-31T23:59:59.000Z

464

The Electricity and Transportation Infrastructure Convergence  

E-Print Network [OSTI]

The Electricity and Transportation Infrastructure Convergence Using Electrical Vehicles Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;#12;The Electricity and Transportation Infrastructure Convergence Using Electrical

465

Electric Adsorption Heat Pump for Electric Vehicles: Electric-Powered Adsorption Heat Pump for Electric Vehicles  

SciTech Connect (OSTI)

HEATS Project: PNNL is developing a new class of advanced nanomaterial called an electrical metal organic framework (EMOF) for EV heating and cooling systems. The EMOF would function similar to a conventional heat pump, which circulates heat or cold to the cabin as needed. However, by directly controlling the EMOF's properties with electricity, the PNNL design is expected to use much less energy than traditional heating and cooling systems. The EMOF-based heat pumps would be light, compact, efficient, and run using virtually no moving parts.

None

2011-11-21T23:59:59.000Z

466

Electrically conductive composite material  

DOE Patents [OSTI]

An electrically conductive composite material is disclosed which comprises a conductive open-celled, low density, microcellular carbon foam filled with a non-conductive polymer or resin. The composite material is prepared in a two-step process consisting of first preparing the microcellular carbon foam from a carbonizable polymer or copolymer using a phase separation process, then filling the carbon foam with the desired non-conductive polymer or resin. The electrically conductive composites of the present invention has a uniform and consistent pattern of filler distribution, and as a result is superior over prior art materials when used in battery components, electrodes, and the like. 2 figs.

Clough, R.L.; Sylwester, A.P.

1989-05-23T23:59:59.000Z

467

Electrically conductive composite material  

DOE Patents [OSTI]

An electrically conductive composite material is disclosed which comprises a conductive open-celled, low density, microcellular carbon foam filled with a non-conductive polymer or resin. The composite material is prepared in a two-step process consisting of first preparing the microcellular carbon foam from a carbonizable polymer or copolymer using a phase separation process, then filling the carbon foam with the desired non-conductive polymer or resin. The electrically conductive composites of the present invention has a uniform and consistent pattern of filler distribution, and as a result is superior over prior art materials when used in battery components, electrodes, and the like. 2 figs.

Clough, R.L.; Sylwester, A.P.

1988-06-20T23:59:59.000Z

468

Electrically conductive composite material  

DOE Patents [OSTI]

An electrically conductive composite material is disclosed which comprises a conductive open-celled, low density, microcellular carbon foam filled with a non-conductive polymer or resin. The composite material is prepared in a two-step process consisting of first preparing the microcellular carbon foam from a carbonizable polymer or copolymer using a phase separation process, then filling the carbon foam with the desired non-conductive polymer or resin. The electrically conductive composites of the present invention has a uniform and consistant pattern of filler distribution, and as a result is superior over prior art materials when used in battery components, electrodes, and the like.

Clough, Roger L. (Albuquerque, NM); Sylwester, Alan P. (Albuquerque, NM)

1989-01-01T23:59:59.000Z

469

Liquid metal electric pump  

DOE Patents [OSTI]

An electrical pump for pumping liquid metals to high pressures in high temperature environments without the use of magnets or moving mechanical parts. The pump employs a non-porous solid electrolyte membrane, typically ceramic, specific to the liquid metal to be pumped. A DC voltage is applied across the thickness of the membrane causing ions to form and enter the membrane on the electrically positive surface, with the ions being neutralized on the opposite surface. This action provides pumping of the liquid metal from one side of the non-porous solid electrolyte membrane to the other.

Abbin, Joseph P. (Albuquerque, NM); Andraka, Charles E. (Albuquerque, NM); Lukens, Laurance L. (Albuquerque, NM); Moreno, James B. (Albuquerque, NM)

1992-01-01T23:59:59.000Z

470

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented at Wind Powering America States Summit. The Summit, which follows the American Wind Energy Association's (AWEA's) annual WINDPOWER Conference and Exhibition, provides state Wind Working Groups, state energy officials, U.S. Energy Department and national laboratory representatives, and professional and institutional partners an opportunity to review successes, opportunities, and challenges for wind energy and plan future collaboration.

DeMeo, E.

2012-08-01T23:59:59.000Z

471

Renewable Electricity Futures (Presentation)  

SciTech Connect (OSTI)

This presentation library summarizes findings of NREL's Renewable Electricity Futures study, published in June 2012. RE Futures investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. It was presented at the 2012 RE AMP Annual Meeting. RE-AMP is an active network of 144 nonprofits and foundations across eight Midwestern states working on climate change and energy policy with the goal of reducing global warming pollution economy-wide 80% by 2050.

Mai, T.

2012-08-01T23:59:59.000Z

472

Preventing Electrical Shock  

E-Print Network [OSTI]

closer to un- guarded energized overhead lines than the following distances: 1) For voltages to ground 50 kV or less?10 feet; 2) For voltages to ground more than 50 kV ?10 feet plus 4 inches for every 10 kV over 50 kV. ? Make sure all electric motors... attempt to unplug the cord, move an energized line with any object, or grab the person to free him. Once the person is free, administer CPR immedi- ately, if necessary, to try to resuscitate the individual. In case of an electrical fi re, turn off...

Smith, David

2004-09-16T23:59:59.000Z

473

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware Electricity Profile 2012Louisiana Electricity

474

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware Electricity ProfileMichigan Electricity Profile

475

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware Electricity ProfileMichigan Electricity

476

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware Electricity ProfileMichiganMissouri Electricity

477

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshire Electricity Profile 2012

478

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshire Electricity Profile

479

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshire Electricity ProfileMexico

480

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshire Electricity

Note: This page contains sample records for the topic "bristol tennessee electric" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshire ElectricityCarolina

482

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshire ElectricityCarolinaDakota

483

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshireOklahoma Electricity

484

EIA - State Electricity Profiles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutron scatteringDelaware ElectricityHampshireOklahoma ElectricityOregon

485

Liquid metal electric pump  

DOE Patents [OSTI]

An electrical pump for pumping liquid metals to high pressures in high temperature environments without the use of magnets or moving mechanical parts. The pump employs a non-porous solid electrolyte membrane, typically ceramic, specific to the liquid metal to be pumped. A DC voltage is applied across the thickness of the membrane causing ions to form and enter the membrane on the electrically positive surface, with the ions being neutralized on the opposite surface. This action provides pumping of the liquid metal from one side of the non-porous solid electrolyte membrane to the other. 3 figs.

Abbin, J.P.; Andraka, C.E.; Lukens, L.L.; Moreno, J.B.

1992-01-14T23:59:59.000Z

486

Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12  

SciTech Connect (OSTI)

Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered vegetation but are generally open and accessible. With limited exception, all materials contained in the scrap yard have been removed and disposed at the EMWMF. Soils that underlay the original waste storage area in EUs 29 and 31 as well as soils that underlay the scrap piles in EUs 30 and 32 show substantially elevated radioactivity. In addition to soils present at the site, remaining portions of foundations/floor slabs for Bldgs. K-725, K-726, and K-736 as well as the unnamed pad at the northeast corner of the site constructed to support the sort and segregation operations at the K-770 Scrap Removal Project in 2006 and several other small, unnamed concrete pads are included in this waste lot. While many of these foundations/floor slabs will be removed because they are contaminated, some of the smaller unamed concrete pads will be removed in order to access contaminated soils that are around and under the pads and regrade the site. Appendix E contains a map showing the areas of soil and concrete pads that are expected to be excavated. Soils in the areas indicated on this map will be removed to approximately one foot below the surface. (This corresponds to the soil interval sampled and analyzed to characterize this waste lot.) Contaminants present in the soils are directly derived from metallic debris and rubbish handled by the waste storage operations, are concentrated in the top few inches, and include the predominant constituents of concern associated with the metallic waste already disposed at EMWMF. Additionally, some residual metallic debris remains embedded in the shallow soils that underlay the former debris piles. This residual metallic debris is eligible for disposal in the EMWMF WAC criteria as defined in Waste Profile for: Disposal of the Scrap Removal Project Waste Lot 65.1 East Tennessee Technology Park, Oak Ridge, Tennessee (BJC 2004a). This waste, however, has been included in Waste Lot 4.12 to conform to the more rigorous profiling requirements currently contained in Waste Acceptance Criteria Attainment Team Project Execution Plan Environmental Manag

Davenport M.

2009-04-15T23:59:59.000Z

487

Recirculating electric air filter  

DOE Patents [OSTI]

An electric air filter cartridge has a cylindrical inner high voltage electrode, a layer of filter material, and an outer ground electrode formed of a plurality of segments moveably connected together. The outer electrode can be easily opened to remove or insert filter material. Air flows through the two electrodes and the filter material and is exhausted from the center of the inner electrode.

Bergman, W.

1985-01-09T23:59:59.000Z

488

INTRODUCTION Ukiah Electric Utility  

E-Print Network [OSTI]

INTRODUCTION Ukiah Electric Utility Renewable Energy Resources Procurement Plan Per Senate Billlx 2 renewable energy resources, including renewable energy credits, as a specified percentage of Ukiah's total,2011 to December 31, 2013, Ukiah shall procure renewable energy resources equivalent to an average of at least

489

STUDY PROGRAMS ELECTRICAL ENGINEERING  

E-Print Network [OSTI]

Engineering Master of Science in Electrical Engineering Language of Instruction: German Duration of Program microprocessors to re- newable energy systems. The curriculum's scientific and methodological foundation ensures are taught in German, though some will be available in English. At the end of each semester, students

Wichmann, Felix

490

7Name ________________________________ Solar Electricity.  

E-Print Network [OSTI]

be attached directly to the outer surface of a satellite, or can be found on `solar panels' that the satellite. If the satellite is not big enough, additional solar panels may be needed to supply the electricity) The solar cells produce 0.03 watts per square cm, so the power available is 39819 x 0.03 = 1194 watts

491

State Renewable Electricity Profiles  

Reports and Publications (EIA)

Presents a summary of current and recent historical data for the renewable electric power industry. The data focuses on net summer capacity and net generation for each type of renewable generator, as well as fossil-fired and nuclear power plant types, for the period 2006 through 2010.

2012-01-01T23:59:59.000Z

492

Wind farm electrical system  

DOE Patents [OSTI]

An approach to wind farm design using variable speed wind turbines with low pulse number electrical output. The output of multiple wind turbines are aggregated to create a high pulse number electrical output at a point of common coupling with a utility grid network. Power quality at each individual wind turbine falls short of utility standards, but the aggregated output at the point of common coupling is within acceptable tolerances for utility power quality. The approach for aggregating low pulse number electrical output from multiple wind turbines relies upon a pad mounted transformer at each wind turbine that performs phase multiplication on the output of each wind turbine. Phase multiplication converts a modified square wave from the wind turbine into a 6 pulse output. Phase shifting of the 6 pulse output from each wind turbine allows the aggregated output of multiple wind turbines to be a 24 pulse approximation of a sine wave. Additional filtering and VAR control is embedded within the wind farm to take advantage of the wind farm's electrical impedence characteristics to further enhance power quality at the point of common coupling.

Erdman, William L.; Lettenmaier, Terry M.

2006-07-04T23:59:59.000Z

493

Electric Load Forecasting  

E-Print Network [OSTI]

-commitment, coordination, and interchange evaluation. In addition, the liberalization of electric energy markets worldwide has led to the development of energy exchanges where consumers, 1066-033X/07/$25.002007IEEE OCTOBER/GODDARD SPACE FLIGHT CENTER SCIENTIFIC VISUALIZATION STUDIO Authorized licensed use limited to: Katholieke

494

The development of an aquatic spill model for the White Oak Creek watershed, Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This study develops an aquatic spill model applicable to the White Oak Creek watershed draining the Oak Ridge National Laboratory. Hazardous, toxic, and radioactive chemicals are handled and stored on the laboratory reservation. An accidental spill into the White Oak Creek watershed could contaminate downstream water supplies if insufficient dilution did not occur. White Oak Creek empties into the Clinch River, which flows into the Tennessee River. Both rivers serve as municipal water supplies. The aquatic spill model provides estimates of the dilution at sequential downstream locations along White Oak creek and the Clinch River after an accidental spill of a liquid containing a radioactively decaying constituent. The location of the spill on the laboratory is arbitrary, while hydrologic conditions range from drought to extreme flood are simulated. The aquatic spill model provides quantitative estimates with which to assess water quality downstream from the site of the accidental spill, allowing an informed decision to be made whether to perform mitigating measures so that the integrity of affected water supplies is not jeopardized.

Johnson, R.O.

1996-05-01T23:59:59.000Z

495

COMPARISON OF RESULTS FOR QUARTER 2 SURFACE WATER SPLIT SAMPLES COLLECTED AT THE NUCLEAR FUEL SERVICES SITE, ERWIN, TENNESSEE  

SciTech Connect (OSTI)

Oak Ridge Associated Universities (ORAU), under the Oak Ridge Institute for Science and Education (ORISE) contract, collected split surface water samples with Nuclear Fuel Services (NFS) representatives on November 15, 2012. Representatives from the U.S. Nuclear Regulatory Commission and Tennessee Department of Environment and Conservation were also in attendance. Samples were collected at four surface water stations, as required in the approved Request for Technical Assistance number 11-018. These stations included Nolichucky River upstream (NRU), Nolichucky River downstream (NRD), Martin Creek upstream (MCU), and Martin Creek downstream (MCD). Both ORAU and NFS performed gross alpha and gross beta analyses, and the results are compared using the duplicate error ratio (DER), also known as the normalized absolute difference. A DER {<=} 3 indicates that, at a 99% confidence interval, split sample results do not differ significantly when compared to their respective one standard deviation (sigma) uncertainty (ANSI N42.22). The NFS split sample report does not specify the confidence level of reported uncertainties (NFS 2012). Therefore, standard two sigma reporting is assumed and uncertainty values were divided by 1.96. In conclusion, all DER values were less than 3 and results are consistent with low (e.g., background) concentrations.

none,

2013-01-21T23:59:59.000Z

496

Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-03-01T23:59:59.000Z

497

Biotelemetry study of spring and summer habitat selection by striped bass in Cherokee Reservoir, Tennessee, 1978. [Morone saxatilis  

SciTech Connect (OSTI)

Habitat selection of 31 adult striped bass was monitored by temperature sensing ultrasonic and radio transmitters in Cherokee Reservoir, Tennessee, from March through October 1978. This study sought to corroborate summer data obtained by Waddle (1979) in 1977 and to examine mechanisms of habitat selection by observing establishment of the summer distribution. During the spring and early summer months the striped bass ranged throughout the study area in the downstream half of the reservoir. Fish stayed near the bottom at the preferred temperatures throughout the whole study, and no individuals were observed in open water. Movement rates of up to 2.6 km/day were estimated, and rates of 1 km/day were common in the spring. By late July they were apparently avoiding low dissolved oxygen (D.O.) concentrations (<3 mg/l) near the bottom of the main reservoir and epilimnion temperatures greater than 22/sup 0/C, and they moved into cool, oxygenated spring or creek channels (refuges). Low movement rates of 0 to 25 m/day within these refuges occurred. The rates of the few migrations between refuges could not be estimated. Tagged fish moved out of the refuges 3 to 4 weeks after the fall overturn when reservoir temperatures approximated 22 to 24/sup 0/C.

Schaich, B.A.; Coutant, C.C.

1980-08-01T23:59:59.000Z

498

Health risk assessment for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This human health risk assessment has been prepared for the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. The objectives of this risk assessment are to evaluate the alternatives for interim closure of the Building 3001 Storage Canal and to identify the potential health risk from an existing leak in the canal. The Building 3001 Storage Canal connects Buildings 3001 and 3019. The volume of water in the canal is monitored and kept constant at about 62,000 gal. The primary contaminants of the canal water are the radionuclides {sup 137}Cs, {sup 60}Co, and {sup 90}Sr; a layer of sediment on the canal floor also contains radionuclides and metals. The prime medium of contaminant transport has been identified as groundwater. The primary route for occupational exposure at the canal is external exposure to gamma radiation from the canal water and the walls of the canal. Similarly, the primary exposure route at the 3042 sump is external exposure to gamma radiation from the groundwater and the walls of the sump. Based on the exposure rates in the radiation work permits (Appendix C) and assuming conservative occupational work periods, the annual radiation dose to workers is considerably less than the relevant dose limits. The potential risk to the public using the Clinch River was determined for three significant exposure pathways: ingestion of drinking water; ingestion of contaminated fish; and external exposure to contaminated sediments on the shoreline, the dominant exposure pathway.

Chidambariah, V.; White, R.K.

1991-12-01T23:59:59.000Z

499

Final construction quality assurance report for the Y-12 Industrial Landfill V, Area 2, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

Lockheed Martin Energy Systems (LMES) has finished construction of Area 2 of the Y-12 Plant Industrial Landfill (ILF-V), classified as a Class 2 Landfill. This final Construction Quality Assurance (CQA) Report provides documentation that Area 2 was constructed in substantial compliance with the Tennessee Department of Environment and Conservation (TDEC) approved design, as indicated and specified in the permit drawings, approved changes, and specifications. This report applies specifically to the Area 2 excavation, compacted clay soil liner, geomembrane liner, granular leachate collection layer, protective soil cover, and the leachate collection system. An ``As-Built`` survey was performed and is included. The drawings provide horizontal and vertical information for Area 2, the anchor trench, the leachate collection pipe, the temporary access road, and cross-sections of Area 2. This report provides documentation of the following items: the excavation activities of Area 2; the maximum recompacted coefficient of hydraulic conductivity or permeability of the soil is less than 1 {times} 10{sup {minus}7} centimeters per second (cm/sec); the total thickness of the compacted clay soil liner equals a minimum of 2 feet; a 40 mil impermeable geomembrane (polypropylene) flexible membrane liner (FML) and 16 oz. geotextile fabric was placed in direct contact with the compacted clay soil liner; a 12 inch granular leachate collection layer was installed and covered with a 8 oz. geotextile separation fabric; the installation of the leachate collection piping; and the two foot protective clay soil cover.

Bessom, W.H. [Lockheed Martin Energy Systems, Inc., Oak Ridge, TN (United States)

1996-11-01T23:59:59.000Z

500

Chestnut Ridge Sediment Disposal Basin (D-025): Summary of closure under Rules Governing Hazardous Waste Management in Tennessee  

SciTech Connect (OSTI)

On February 29, 1988, the Revised Closure Plan for Chestnut Ridge Sediment Disposal Basin,'' Y/TS-390 (Reference 1) was submitted to the United States Department of Energy (DOE) for review and transmittal to the Tennessee Department of Health and Environment (TDHE). The closure activities described in the closure plan have been performed. The purpose of this document is to summarize the closure activities for the Chestnut Ridge Sediment Disposal (CRSDB). The closure of CRSDB is a final closure. The Chestnut Ridge Sediment Disposal Basin (CRSDB), Unit D-025, was an unlined, man-made sediment disposal facility on Chestnut Ridge, south of New Hope Pond (NHP). The CRSDB was constructed during 1972--73 for the disposal of sediments hydraulically dredged from NHP. It was designed to hold approximately 30,000 cubic yards of sediments. Since 1973, the basin had been used for the periodic disposal of sediments excavated from NHP and its appurtenant structures. NHP has previously received discharges form RCRA-related waste streams. 19 refs., 3 figs., 1 tab.

Stone, J.E.