Powered by Deep Web Technologies
Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12...  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement...

2

Automated Circuit Breaker Monitoring U.S. DOE CERTS Project  

E-Print Network [OSTI]

Reliability Technology Solutions (CERTS), and funded by the Office of Electric Transmission and Distribution a portion of the power system is very critical task and circuit breakers must be very reliableAutomated Circuit Breaker Monitoring U.S. DOE CERTS Project Power Systems Engineering Research

3

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey C-Array, August 20th 2013 #12;VLA Antenna Pad Transformer Breaker Survey C-Array, August 2013, Bob Broilo 2 Summary: Breaker at CE7 needs to be replaced transformer can be shut down with the switch at DE9. Inspected by: Bob Broilo Inspection Date: 8/16/2013 2

Groppi, Christopher

4

NACS Voice Mail Replacement Project  

E-Print Network [OSTI]

NACS Voice Mail Replacement Project Presented to the TPAG Monday, November 13, 2006 #12 criteria Integration with email is a key factor Taking a second look at Cisco & AVST Cost of Interactive

Brody, James P.

5

Rectifier cabinet static breaker  

DOE Patents [OSTI]

A rectifier cabinet static breaker replaces a blocking diode pair with an SCR and the installation of a power transistor in parallel with the latch contactor to commutate the SCR to the off state. The SCR serves as a static breaker with fast turnoff capability providing an alternative way of achieving reactor scram in addition to performing the function of the replaced blocking diodes. The control circuitry for the rectifier cabinet static breaker includes on-line test capability and an LED indicator light to denote successful test completion. Current limit circuitry provides high-speed protection in the event of overload.

Costantino, Jr, Roger A. (Mifflin, PA); Gliebe, Ronald J. (Library, PA)

1992-09-01T23:59:59.000Z

6

Low Insertion HVDC Circuit Breaker: Magnetically Pulsed Hybrid Breaker for HVDC Power Distribution Protection  

SciTech Connect (OSTI)

GENI Project: General Atomics is developing a direct current (DC) circuit breaker that could protect the grid from faults 100 times faster than its alternating current (AC) counterparts. Circuit breakers are critical elements in any electrical system. At the grid level, their main function is to isolate parts of the grid where a fault has occurred—such as a downed power line or a transformer explosion—from the rest of the system. DC circuit breakers must interrupt the system during a fault much faster than AC circuit breakers to prevent possible damage to cables, converters and other grid-level components. General Atomics’ high-voltage DC circuit breaker would react in less than 1/1,000th of a second to interrupt current during a fault, preventing potential hazards to people and equipment.

None

2012-01-09T23:59:59.000Z

7

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2008-10-10T23:59:59.000Z

8

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2009-05-15T23:59:59.000Z

9

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

10

Vacuum breaker valve assembly  

DOE Patents [OSTI]

Breaker valve assemblies for a simplified boiling water nuclear reactor are described. The breaker valve assembly, in one form, includes a valve body and a breaker valve. The valve body includes an interior chamber, and an inlet passage extends from the chamber and through an inlet opening to facilitate transporting particles from outside of the valve body to the interior chamber. The breaker valve is positioned in the chamber and is configured to substantially seal the inlet opening. Particularly, the breaker valve includes a disk which is sized to cover the inlet opening. The disk is movably coupled to the valve body and is configured to move substantially concentrically with respect to the valve opening between a first position, where the disk completely covers the inlet opening, and a second position, where the disk does not completely cover the inlet opening. 1 fig.

Thompson, J.L.; Upton, H.A.

1999-04-27T23:59:59.000Z

11

Vacuum breaker valve assembly  

DOE Patents [OSTI]

Breaker valve assemblies for a simplified boiling water nuclear reactor are described. The breaker valve assembly, in one form, includes a valve body and a breaker valve. The valve body includes an interior chamber, and an inlet passage extends from the chamber and through an inlet opening to facilitate transporting particles from outside of the valve body to the interior chamber. The breaker valve is positioned in the chamber and is configured to substantially seal the inlet opening. Particularly, the breaker valve includes a disk which is sized to cover the inlet opening. The disk is movably coupled to the valve body and is configured to move substantially concentrically with respect to the valve opening between a first position, where the disk completely covers the inlet opening, and a second position, where the disk does not completely cover the inlet opening.

Thompson, Jeffrey L. (San Jose, CA); Upton, Hubert Allen (Morgan Hill, CA)

1999-04-27T23:59:59.000Z

12

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey A-Array, May 20, 2014 Summary: The breakers at AN5 Transformer Breaker Survey A-Array, May 2014, Bob Broilo 2 Inspected by: Bob Broilo Inspection Date: 5 Notes: #12;VLA Antenna Pad Transformer Breaker Survey A-Array, May 2014, Bob Broilo 3 Inspected by: Bob

Groppi, Christopher

13

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey D-Array, April 5th 2013 #12;VLA Antenna Pad Transformer Breaker Survey D-Array, April 2013, Bob Broilo 2 Summary: No action needed. Inspected by: Bob2 Visible Light Image Notes: #12;VLA Antenna Pad Transformer Breaker Survey D-Array, April 2013, Bob

Groppi, Christopher

14

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey B-Array, May 2011, Bob Broilo #12;B-array Antenna Pad Transformer Breaker Survey May 2011, Bob Broilo 2 Inspected by: Bob Broilo Inspection Date: 5 Transformer Breaker Survey May 2011, Bob Broilo 3 Inspected by: Bob Broilo Inspection Date: 5/5/2011 3

Groppi, Christopher

15

Circuit breaker lockout device  

SciTech Connect (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

1992-01-01T23:59:59.000Z

16

Circuit breaker lockout device  

DOE Patents [OSTI]

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker. 2 figs.

Kozlowski, L.J.; Shirey, L.A.

1992-11-24T23:59:59.000Z

17

Circuit breaker lockout device  

SciTech Connect (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin is installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

Kozlowski, L.J.; Shirey, L.A.

1991-12-31T23:59:59.000Z

18

Plug Detector Bypass Breaker Guard  

DOE Patents [OSTI]

A method and apparatus wherein the apparatus is a container having an inner chamber, an inlet, an outlet, a breaker assembly having at least one blade within the inner chamber of the container and a motor for driving the blade. Material is supplied to the inner chamber of the container through the inlet of the container and the breaker assembly is operated to reduce any clumped material into unclumped material which is then dispensed from the container through the outlet of the container.

Horton, Joel Richard (Maryville, TN); Dearstone, Robert Link (Powell, TN)

2000-01-01T23:59:59.000Z

19

Milling Machine Replacement Project (4587), 5/11/2012  

Broader source: Energy.gov (indexed) [DOE]

by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital...

20

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Developing a total replacement cost index for suburban office projects  

E-Print Network [OSTI]

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

22

Commutation circuit for an HVDC circuit breaker  

DOE Patents [OSTI]

A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components.

Premerlani, William J. (Scotia, NY)

1981-01-01T23:59:59.000Z

23

Commutation circuit for an HVDC circuit breaker  

DOE Patents [OSTI]

A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components. 13 figs.

Premerlani, W.J.

1981-11-10T23:59:59.000Z

24

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey B-Array, November 22nd , 2013 Summary: None connections in the cabinet and may be indicating a problem inside the transformer. If the heating on these bushings continues the transformer may need service. NOTE: The low ambient temperature and good conductance

Groppi, Christopher

25

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey A-Array, July 2011, Bob Broilo #12;A-Array Antenna Pad Transformer Survey July 2011, Bob Broilo 2 Inspected by: Bob Broilo Inspection Date: 6/16/2011 2 Transformer Survey July 2011, Bob Broilo 3 Inspected by: Bob Broilo Inspection Date: 6/16/2011 1:58:06 PM

Groppi, Christopher

26

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey D-Array, October 2011, Bob Broilo #12;D-Array Antenna Pad Transformer Survey October 2011, Bob Broilo 2 Inspected by: Bob Broilo Inspection Date: 10-hand) feeds DE2. #12;D-Array Antenna Pad Transformer Survey October 2011, Bob Broilo 3 Inspected by: Bob

Groppi, Christopher

27

VLA Antenna Pad Transformer Breaker  

E-Print Network [OSTI]

NRAO VLA Antenna Pad Transformer Breaker Survey C-Array, April 2012, Bob Broilo #12;C-Array Antenna Pad Transformer Survey April 2012, Bob Broilo 2 Inspected by: Bob Broilo Inspection Date: 4/4/2012 2 Pad Transformer Survey April 2012, Bob Broilo 3 Inspected by: Bob Broilo Inspection Date: 4/4/2012 2

Groppi, Christopher

28

Hydraulic actuator for an electric circuit breaker  

DOE Patents [OSTI]

This actuator comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit breaker opening operation. The breaker-opening space and the breaker-closing space are connected by an impeded flow passage. A pilot valve opens to allow the pressurized liquid in the breaker-closing space to flow to a back chamber of a normally closed main valve to cause the main valve to be opened during a circuit breaker opening operation to release the pressurized liquid from the breaker-closing space. An impeded passage affords communication between the back chamber and a sump located on the opposite side of the main valve from the back chamber. The pilot valve and impeded passage allow rapid opening of the main valve with pressurized liquid from the breaker closing side of the piston.

Imam, Imdad (Colonie, NY)

1983-01-01T23:59:59.000Z

29

Hydraulic actuator for an electric circuit breaker  

DOE Patents [OSTI]

This actuator comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit breaker opening operation. The breaker-opening space and the breaker-closing space are connected by an impeded flow passage. A pilot valve opens to allow the pressurized liquid in the breaker-closing space to flow to a back chamber of a normally closed main valve to cause the main valve to be opened during a circuit breaker opening operation to release the pressurized liquid from the breaker-closing space. An impeded passage affords communication between the back chamber and a sump located on the opposite side of the main valve from the back chamber. The pilot valve and impeded passage allow rapid opening of the main valve with pressurized liquid from the breaker closing side of the piston. 3 figs.

Imam, I.

1983-05-17T23:59:59.000Z

30

Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project  

SciTech Connect (OSTI)

CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-04T23:59:59.000Z

31

Siphon breaker design requirements  

SciTech Connect (OSTI)

This project was intended to provide experimental data on siphon flow effects. The system was to be modeled with the RELAP code and the predicted and measured performances compared. The experimental system consists of a 500-gallon upper tank, a 4-inch downcomer pipe, a lower catch tank, a return pump and associated piping. The downcomer pipe is made of 4-inch clear acrylic pipe so the flow patterns could be observed and video taped during the test runs.

Neill, D.T.; Stephens, A.G.

1990-01-01T23:59:59.000Z

32

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network [OSTI]

). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

33

A 4000-A HVDC (high-voltage direct-current) circuit breaker with fast fault-clearing capability: Final report  

SciTech Connect (OSTI)

This project is a follow-up of the first development of a 500 kV HVDC airblast circuit breaker (EPRI project 1507-3). The objective was to increase the current interrupting capability from 2200 A to 4000 A and shorten its fault clearing time. A high current 500 kV HVDC circuit breaker has been built using the passive commutation circuit. The breaker is modular in construction and can be designed for a wide variety of system conditions. More than 400 current interruptions were carried out successfully. Tests have shown that this circuit breaker is capable of interrupting more than 4000 A dc. Practical breakers with current interrupting capability of even 5500 A dc could be built. The circuit breaker operation and the fault-clearing process can be materially speeded up if the trip signal is given as soon as the fault is detected and without waiting for the current levels to come down in response to converter control action. The new dc breakers are shown to be capable of withstanding these transient arc currents of 8000 A without affecting its ability to interrupt the direct current that follows the transient. This transient current withstand capability is greater than is likely to occur during dc faults. The fault clearing time of this HVDC circuit breaker is comparable to the fault clearing time of conventional ac breakers for ac faults. The developed HVDC circuit breaker is now commercially available and can be supplied for use in HVDC systems. Its use in such systems is expected to provide flexibility in system design and contribute to system stability. 38 refs., 52 figs., 9 tabs.

Not Available

1988-04-01T23:59:59.000Z

34

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

35

The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project  

SciTech Connect (OSTI)

The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref.

Presgrove, S.B. (Bechtel Savannah River, Inc., North Augusta, SC (United States))

1992-01-01T23:59:59.000Z

36

The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project  

SciTech Connect (OSTI)

The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref.

Presgrove, S.B. [Bechtel Savannah River, Inc., North Augusta, SC (United States)

1992-08-01T23:59:59.000Z

37

Lockout device for high voltage circuit breaker  

SciTech Connect (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, L.J.; Shirey, L.A.

1993-01-26T23:59:59.000Z

38

Lockout device for high voltage circuit breaker  

DOE Patents [OSTI]

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the repsective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

1993-01-01T23:59:59.000Z

39

Lookout device for high voltage circuit breaker  

SciTech Connect (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, L.J.; Shirey, L.A.

1991-12-31T23:59:59.000Z

40

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects  

SciTech Connect (OSTI)

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

Richman, Eric E.

2009-11-04T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

42

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

43

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

44

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final  

E-Print Network [OSTI]

TR-246 October 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson... estimates of water-savings (i.e., seepage and evaporation) and the initial construction cost. Also, an engineering design change resulted in the east and west forks of the Main Canal being replaced with 48" instead of 54" pipeline. This Final document...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

45

Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement Project  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement the current taphole replacement problem Use advanced decision-making tools to select an optimal concept to be manufactured An SOP was created that standardized the taphole replacement process and reduced overall

Demirel, Melik C.

46

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...  

Broader source: Energy.gov (indexed) [DOE]

replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors. crossarms. Insulators, and downed transmission lines, in accordance,...

47

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary  

E-Print Network [OSTI]

) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

48

Paraffinic versus naphthenic oils for power circuit breaker applications  

SciTech Connect (OSTI)

Tests comparing paraffinic and naphthenic crude-based insulating oils revealed no significant differences in the mechanical operation of an oil circuit breaker using the two oils. However, the higher pour point, longer carbon-setting rate, and lower gas generation of the paraffinic oil could affect a breaker's insulating and interrupting performance.

Sloat, T.K.; Martello, N.E.; Benish, E.A.; Donohue, E.P.; Tragesser, C.W.; Zinchuk, T.C.

1986-01-01T23:59:59.000Z

49

Circuit breaker monitoring application using wireless communication  

E-Print Network [OSTI]

synchronizes recorded data to a global time standard enabling system-wide applications to use the recorded data. ? Ease of installation: The circuit breaker monitoring system can be installed at a substation within minutes by one or two personnel. The system... is powered by a 130V DC source, usually a battery in the substation control house, called the supply volt- age. All elements of the circuit are connected between the positive and the negative terminals of the supply voltage.Another voltage source called...

Ved, Nitin

2007-04-25T23:59:59.000Z

50

Waste minimization plan construction and operation of the replacement cross-site transfer system, project W-058  

SciTech Connect (OSTI)

This report addresses the research and development of a waste minimization plan for the construction and operation of Project W-058, Replacement of the Cross-Site Transfer System, on the Hanford Site. The plan is based on Washington Administrative Code (WAC) 173-307, Plans. The waste minimization plan identifies areas where pollution prevention/waste minimization principles can be incorporated into the construction and operation of the cross-site transfer system.

Boucher, T.D.

1996-04-01T23:59:59.000Z

51

Integral testing of relays and circuit breakers  

SciTech Connect (OSTI)

Among all equipment types considered for seismic qualification, relays have been most extensively studied through testing due to a wide variation of their designs and seismic capacities. A temporary electrical discontinuity or ``chatter`` is the common concern for relays. A chatter duration of 2 milliseconds is typically used as an acceptance criterion to determine the seismic capability of a relay. Many electrical devices, on the other hand, receiving input signals from relays can safely tolerate a chatter level much greater than 2 ms. In Phase I of a test program, Brookhaven National Laboratory performed testing of many relay models using the 2-ms chatter criterion. In Phase II of the program, the factors influencing the relay chatter criterion, and impacts of relay chatter on medium and low voltage circuit breakers and lockout relays were investigated. This paper briefly describes the Phase II tests and presents the important observations.

Bandyopadhyay, K.K.

1993-12-31T23:59:59.000Z

52

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final  

E-Print Network [OSTI]

Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

53

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary  

E-Print Network [OSTI]

TR-220 May 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant... John R. C. Robinson Michael C. Popp Texas Water Resources Institute Texas A&M University TR-220 May 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

54

Over-Current Protection Scheme for SiC Power MOSFET DC Circuit Breaker  

E-Print Network [OSTI]

V. Radun, “SiC based solid state power controller,” in 23tha solid-state circuit breaker based on SiC power MOSFET withSolid-state DC circuit breakers made of the modern wide bandgap power

Zhang, Yuan; Liang, Yung C.

2015-01-01T23:59:59.000Z

55

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System  

SciTech Connect (OSTI)

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

Stephens, Jessica D.

2013-05-29T23:59:59.000Z

56

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project  

SciTech Connect (OSTI)

Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

2013-06-25T23:59:59.000Z

57

High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

Not Available

1993-06-01T23:59:59.000Z

58

Development studies of a solid-state d.c. circuit breaker based on the GTO  

E-Print Network [OSTI]

Circuit Breaker . . . . . 37 D. Metal-Oxide Varistors in DC Circuit Breaker Applications 42 E. Variable Resistor Characteristics Implemented with a Semiconductor Device . . . . . . . . . . . 43 VI CAPACITIVE CIRCUIT BREAKER 45 VII SWITCHED SNUBBER... maintenance rate and low reliability. The separation of contacts under load draws an electric arc at a relatively high d. c. voltage which serves to dissipate the circuit stored energy. Because of this, the metal contacts suffer from pitting and erosion...

Kernaghan, William Henry

1986-01-01T23:59:59.000Z

59

E-Print Network 3.0 - auto-expansion circuit breaker Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1, circuit breaker monitoring 2... process is briefly described. As an example, maintenance actions associated with ... Source: Kezunovic, Mladen - Department of Electrical...

60

Transient Studies in Large Offshore Wind Farms, Taking Into Account Network Breaker Interaction  

E-Print Network [OSTI]

Transient Studies in Large Offshore Wind Farms, Taking Into Account Network Breaker Interaction studies in offshore wind farms, PSCAD. I. INTRODUCTION IN OWF applications, the consequences of component

Bak, Claus Leth

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

E-Print Network 3.0 - age cross-link breaker Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

be confirmed. For many other test cases used to verify the relays that feed... the lockout switch, the breaker ... Source: Kezunovic, Mladen - Department of Electrical and...

62

Transient recovery voltage considerations in the application of medium voltage circuit breakers  

SciTech Connect (OSTI)

Medium Voltage Circuit Breakers can fail to interrupt 3-phase fault currents when power systems have Transient Recovery Voltage (TRV) characteristics which exceed the rating of the circuit breaker. This paper examines the application of 13.8kV generation and load switchgear for an oil refinery in which circuit parameters as originally designed would have exceeded the 13.8kV circuit breakers TRV ratings had corrective measures not been taken. This paper illustrates this case and discusses the basis of TRV, how TRV is assessed, and alternative actions taken to bring circuits to within the 13.8 kV circuit breaker ratings.

Swindler, D.L.; Schwartz, P.; Hamer, P.S.; Lambert, S.R.

1995-12-31T23:59:59.000Z

63

Siphon breaker design requirements. Progress report  

SciTech Connect (OSTI)

This project was intended to provide experimental data on siphon flow effects. The system was to be modeled with the RELAP code and the predicted and measured performances compared. The experimental system consists of a 500-gallon upper tank, a 4-inch downcomer pipe, a lower catch tank, a return pump and associated piping. The downcomer pipe is made of 4-inch clear acrylic pipe so the flow patterns could be observed and video taped during the test runs.

Neill, D.T.; Stephens, A.G.

1990-12-31T23:59:59.000Z

64

Evaluation of a New Liquid Breaker for Polymer Based In-Situ Gelled Acids  

E-Print Network [OSTI]

A solid breaker is used to reduce the viscosity of the gel at pH range of 4-5 for in-situ gelled acids with Zr4 cross-linkers utilize. However, the literature survey confirmed that solid breakers caused a premature reduction in the fluid viscosity...

Aksoy, Gamze

2012-10-19T23:59:59.000Z

65

Fuse and breaker coordination on the Harlingen distribution system  

E-Print Network [OSTI]

equipment, these relays can be coordinated effectively in many cases by using either a 17 greater pickup tap or high time lever setting or both. In setting the relays it is mandatory that the longest time that a fault may rema1n on a circu1t at any... and Breakers 380 377 3082 356 Wlsn Rd Rec THREE PHASE FAULTS Cj~nerut u n Ivl cAkl mum fYl in I nu. rn A 1 7 p & t) p t Ckpci. el 2670 4300 1590 2065 2410 3690 1490. 1940 2220 3230 1430 1830 1380 1660 1020 1190 1920 2510 1310 1570 LINE TO LINE...

Foelker, Henry Edward

1951-01-01T23:59:59.000Z

66

Fault current limiter and alternating current circuit breaker  

DOE Patents [OSTI]

A solid-state circuit breaker and current limiter are disclosed for a load served by an alternating current source having a source impedance, the solid-state circuit breaker and current limiter comprising a thyristor bridge interposed between the alternating current source and the load, the thyristor bridge having four thyristor legs and four nodes, with a first node connected to the alternating current source, and a second node connected to the load. A coil is connected from a third node to a fourth node, the coil having an impedance of a value calculated to limit the current flowing therethrough to a predetermined value. Control means are connected to the thyristor legs for limiting the alternating current flow to the load under fault conditions to a predetermined level, and for gating the thyristor bridge under fault conditions to quickly reduce alternating current flowing therethrough to zero and thereafter to maintain the thyristor bridge in an electrically open condition preventing the alternating current from flowing therethrough for a predetermined period of time. 9 figs.

Boenig, H.J.

1998-03-10T23:59:59.000Z

67

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington  

Broader source: Energy.gov [DOE]

This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

68

Development and interrupting tests on 250KV 8KA HVDC circuit breaker  

SciTech Connect (OSTI)

This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

1985-09-01T23:59:59.000Z

69

High speed hydraulically-actuated operating system for an electric circuit breaker  

DOE Patents [OSTI]

This hydraulically-actuated operating system comprises a cylinder, a piston movable therein in an opening direction to open a circuit breaker, and an accumulator for supplying pressurized liquid to a breaker-opening piston-actuating space within the cylinder. A normally-closed valve between the accumulator and the actuating space is openable to allow pressurized liquid from the accumulator to flow through the valve into the actuating space to drive the piston in an opening direction. A dashpotting mechanism operating separately from the hydraulic actuating system is provided, thereby reducing flow restriction interference with breaker opening. 3 figs.

Iman, I.

1983-06-07T23:59:59.000Z

70

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

SciTech Connect (OSTI)

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

Not Available

1990-07-01T23:59:59.000Z

71

A Retrofit 60 Hz Current Sensor for Power Monitoring at the Circuit Breaker Panel  

E-Print Network [OSTI]

Improved signal conditioning electronics and new experimental results are presented for a sensor that measures current flow in a circuit breaker. A PIC microcontroller optimizes the phase reference for the synchronous ...

Cooley, John J.

72

EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico  

Broader source: Energy.gov [DOE]

This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

73

Experimental study of Siphon breaker about size effect in real scale reactor design  

SciTech Connect (OSTI)

Rupture accident within the pipe of a nuclear reactor is one of the main causes of a loss of coolant accident (LOCA). Siphon-breaking is a passive method that can prevent a LOCA. In this study, either a line or a hole is used as a siphon-breaker, and the effect of various parameters, such as the siphon-breaker size, pipe rupture point, pipe rupture size, and the presence of an orifice, are investigated using an experimental facility similar in size to a full-scale reactor. (authors)

Kang, S. H. [Mechanical Engineering Dept., POSTECH, Pohang, 790-784 (Korea, Republic of); Ahn, H. S. [Div. of Advanced Nuclear Engineering, POSTECH, Pohang, 790-784 (Korea, Republic of); Kim, J. M. [Mechanical Engineering Dept., POSTECH, Pohang, 790-784 (Korea, Republic of); Joo, H. M. [Dept. of Nuclear Engineering, Hanyang Univ., Seoul, 133-791 (Korea, Republic of); Lee, K. Y.; Seo, K.; Chi, D. Y. [KAERI, Yuseong, Daejeon, 305-353 (Korea, Republic of); Kim, M. H. [Div. of Advanced Nuclear Engineering, POSTECH, Pohang, 790-784 (Korea, Republic of)

2012-07-01T23:59:59.000Z

74

Studying the Breaking Mechanism of Polymer-Based In-Situ Gelled Acids using Solid Breaker  

E-Print Network [OSTI]

of this study is to examine the working mechanisms of the solid breaker and the factors that affect the breaking time. The flowback of the spent acid and the core damage induced by it will also be assessed in detail. Viscosity and rheological experimental...

Tian, Zhida

2012-10-19T23:59:59.000Z

75

Measured turbulent mixing in a small-scale circuit breaker model  

E-Print Network [OSTI]

to understand how hot gas from the arc zone mixes with colder gas in the mixing volume. This mixing process with cold gas that is present, for example, in the exhausts and mixing volume. Understanding the details of the mixing process is imperative to estimate the temperature distribution within the entire breaker volume

Basse, Nils Plesner

76

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

77

Lagrangian kinematics of steep waves up to the inception of a spilling breaker  

E-Print Network [OSTI]

Horizontal Lagrangian velocities and accelerations at the surface of steep water-waves are studied by Particle Tracking Velocimetry (PTV) for gradually increasing crest heights up to the inception of a spilling breaker. Localized steep waves are excited using wavemaker-generated Peregrine breather-type wave trains. Actual crest and phase velocities are estimated from video recorded sequences of the instantaneous wave shape as well as from surface elevation measurements by wave gauges. Effects of nonlinearity and spectral width on phase velocity, as well as relation between the phase velocity and crest propagation speed are discussed. The inception of a spilling breaker is associated with the horizontal velocity of water particles at the crest attaining that of the crest, thus confirming the kinematic criterion for inception of breaking.

Shemer, Lev

2013-01-01T23:59:59.000Z

78

Microsoft Word - CX-Rattlesnake-Garrison I-90 Crossing_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: The project is located in Missoula County, Montana...

79

First SNS Target Replacement  

E-Print Network [OSTI]

First SNS Target Replacement Experience M. Dayton, M. Rennich, Van Graves, J. DeVore Presented by T.S. Department of Energy AHIP Workshop Oct. 2009 Overview · Initial Target Replacement · Target Maintenance-Battelle for the U.S. Department of Energy AHIP Workshop Oct. 2009 First SNS Target Replacement · Replacement

McDonald, Kirk

80

The key word is "supplying." In a load center or panel board, the main circuit breaker supplies power to the internal  

E-Print Network [OSTI]

power to the internal bus bars, as do any backfed circuit breakers supplying power from the PV inverters circuit breaker can supply 100 amps to the bus bars, and at the same time, the inverters may add another these numbers translate to a 3,840-watt (AC inverter output) PV system on a 100-amp panel and a 7,680-watt PV

Johnson, Eric E.

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Analyzing Replacement Stock Alternatives  

E-Print Network [OSTI]

Replacement management strategy involves comparing the values of the breeding stock you own with the value of potential replacements, and then choosing the investment with the highest expected worth. This publication discusses the application...

Falconer, Lawrence; McGrann, James M.; Parker, John; Jones, Rodney

2008-10-21T23:59:59.000Z

82

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...  

Broader source: Energy.gov (indexed) [DOE]

Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

83

Heavy-Duty Natural Gas Drayage Truck Replacement Program  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Heavy-Duty Natural Gas Drayage Truck Replacement Program Principal Investigator: Vicki White South Coast Air Quality Management District May 16, 2012 Project ID ARRAVT045 This...

84

Abstract--Circuit breakers are crucial components for power system operation. The currently adapted time-directed  

E-Print Network [OSTI]

inspection and preventive maintenance are typically performed. The maintenance schedules and routines usually adapted time-directed maintenance strategy and the emerging new condition-based strategy require has been applied in implementing circuit breaker maintenance and repair tasks. Several potential

85

Relay test program. Series 2 tests: Integral testing of relays and circuit breakers  

SciTech Connect (OSTI)

This report presents the results of a relay test program conducted by Brookhaven National Laboratory (BNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). The program is a continuation of an earlier test program the results of which were published in NUREG/CR-4867. The current program was carried out in two phases: electrical testing and vibration testing. The objective was primarily to focus on the electrical discontinuity or continuity of relays and circuit breaker tripping mechanisms subjected to electrical pulses and vibration loads. The electrical testing was conducted by KEMA-Powertest Company and the vibration testing was performed at Wyle Laboratories, Huntsville, Alabama. This report discusses the test procedures, presents the test data, includes an analysis of the data and provides recommendations regarding reliable relay testing.

Bandyopadhyay, K.K.; Kunkel, C.; Shteyngart, S. [Brookhaven National Lab., Upton, NY (United States)

1994-02-01T23:59:59.000Z

86

Radiation Source Replacement Workshop  

SciTech Connect (OSTI)

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

87

Diploma Replacement Order diploma-replace 1/12  

E-Print Network [OSTI]

Diploma Replacement Order diploma-replace 1/12 A replacement diploma may be ordered in the event of loss of or damage to the original diploma. Replacement diplomas are 17Ă? 14 ("mini" diplomas or letter-sized diplomas are no longer available). The replacement diploma fee is $50, payable by check or credit card

Shamos, Michael I.

88

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,Energy

89

Video face replacement  

E-Print Network [OSTI]

We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

Dale, Kevin

90

REQUEST FOR REPLACEMENT DIPLOMA Name: ________________________________________________________________________  

E-Print Network [OSTI]

REQUEST FOR REPLACEMENT DIPLOMA Name. ________________________________________________________________________ First Middle Maiden Last REPLACEMENT DIPLOMA INFORMATION Please print your name exactly as you want it to appear on your replacement diploma. If your name has changed since your degree was awarded, and if you

Gering, Jon C.

91

Chelation: A Fundamental Mechanism of Action of AGE Inhibitors, AGE Breakers, and Other Inhibitors of Diabetes Complications  

SciTech Connect (OSTI)

Advanced glycation or glycoxidation end-products (AGE) increase in tissue proteins with age, and their rate of accumulation is increased in diabetes, nephropathy and inflammatory diseases. AGE inhibitors include a range of compounds that are proposed to act by trapping carbonyl and dicarbonyl intermediates in AGE formation. However, some among the newer generation of AGE inhibitors lack reactive functional groups that would trap reaction intermediates, indicating an alternative mechanism of action. We propose that AGE inhibitors function primarily as chelators, inhibiting metal-catalyzed oxidation reactions. The AGE-inhibitory activity of angiotensin-converting enzyme inhibitors and angiotensin receptor blockers is also consistent with their chelating activity. Finally, compounds described as AGE breakers, or their hydrolysis products, also have strong chelating activity, suggesting that these compounds also act through their chelating activity. We conclude that chelation is the common, and perhaps the primary, mechanism of action of AGE inhibitors and breakers, and that chronic, mild chelation therapy should prove useful in treatment of diabetes and age-related diseases characterized by oxidative stress, inflammation and increased chemical modification of tissue proteins by advanced glycoxidation and lipoxidation end-products.

Nagai, Rhoji; Murray, David B.; Metz, Thomas O.; Baynes, John

2012-03-01T23:59:59.000Z

92

Replace / Renewal BUDGET ZZ106  

E-Print Network [OSTI]

Replace / Renewal BUDGET ZZ106 FUND: 126 CERTIFIED FOOD MANAGER CERTIFICATE RENEWAL Certificate Replacement Reason for Application: Replacement $15.00 Certificate Renewal Reason for Application: [Renewal application may be submitted up to 60 days prior to expiration.] Renewal - $10.00 Please Note: All

93

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network [OSTI]

, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

94

WASTE DESCRIPTION TYPE OF PROJECT POUNDS REDUCED,  

E-Print Network [OSTI]

to the manufacturer . Replaced with energy efficient light emitting diode (LED) signs. Project reduced risk of tritium

95

Enzyme replacement therapy for Pompe disease  

E-Print Network [OSTI]

CALIFORNIA, SAN DIEGO Enzyme Replacement Therapy for Pompe3 1.3 Enzyme Replacement Therapy for Pompe Disease…………………… 5Receptor ERT – Enzyme Replacement Therapy LSD – Lysosomal

Burris, Ryan Jonathan William

2010-01-01T23:59:59.000Z

96

The Ringhals 2 steam generator replacement  

SciTech Connect (OSTI)

Righals 2, located on the west coast of Sweden and operated by Vattenfall (Swedish State Power), is a Westinghouse 800-MW three-loop pressurized water reactor that started commercial operation in 1975. In 1983, a task force was assigned to make a study of the steam generator (SG) tube corrosion problems, mainly stress corrosion cracking in the tubesheet area, which caused between two and three unscheduled outages each year. The task force study concluded that replacement was clearly the best of the three alternatives considered. Late in 1984, a decision was made to replace the SG in the summer of 1989. It was also decided to take advantage of existing margins in the plant by increasing the heat transfer area of the new SG. A power increase of 9% would then be possible by fairly moderate modifications of the turbine plant. The SG replacement project was on time, below budget, and much below dose budget. As a consequence of the 9% uprating, the cost of the SG replacement will be recovered after 3 to 4 yr.

Looft, H.

1990-06-01T23:59:59.000Z

97

Window Replacement, Rehabilitation, & Repair Guides - Building...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

98

242T FACP replacement  

SciTech Connect (OSTI)

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection system functions as required by project criteria. This ATP will test the Pyrotronic CP-400 fire alarm control panel (FACP), and interfaces with the radio fire alarm reporting box, alarm/supervisory initiating devices, and alarm indicating appliances. This document is to certify the installation and testing of the fire alarm control panel and all attached devices to insure the Hanford Fire Dept. receives the proper signals. This fire alarm control panel is located in Bldg. 242T in the 200 W Area of Hanford.

Ferry, M.F.

1994-11-17T23:59:59.000Z

99

2707SX FACP replacement  

SciTech Connect (OSTI)

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection system functions as required by project criteria. This ATP will test the Pyrotronic CP-400 fire alarm control panel (FACP), and interfaces with the radio fire alarm reporting box, alarm/supervisory initiating devices, and alarm indicating appliances. This document is to certify the installation of the fire alarm control panel and all attached devices to insure the Hanford Fire Dept. receives the proper signals. This particular fire alarm control panel services Bldg. 2707SX in the 200W Area of Hanford.

Ferry, M.F.

1994-11-17T23:59:59.000Z

100

Microsoft Word - CX-HatwaiBreakerFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

February 9, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Emmanuel Jaramillo Project Manager - TEP-TPP-1 Proposed Action: Hatwai 230-kV Substation...

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Replacing PG and E's Milpitas terminal  

SciTech Connect (OSTI)

This paper reports that Pacific Gas and Electric Co.'s Milpitas Terminal was originally built in 1929, when natural gas was first brought to the San Francisco Bay Area from the Kettleman Hills gas fields. This paper reports that in 1985, a project was begun to replace the old terminal due to maintenance problems, odor complaints and unaccounted-for gas due to poor measurement quality. The location of the terminal was also a problem. A proposed highway expansion would encroach into the yard area where the existing pipeline was located. In addition, the original location was in agricultural lands, which was changing to commercial use.

Rawcliffe, R.S.; Maceyka, R.A. (Pacific Gas and Electric Co., San Francisco, CA (US))

1991-07-01T23:59:59.000Z

102

Energy Replacement Generation Tax Exemption  

Broader source: Energy.gov [DOE]

Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax...

103

Virent is Replacing Crude Oil  

Broader source: Energy.gov [DOE]

Breakout Session 2A—Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

104

Buying Vs. Raising Replacement Heifers  

E-Print Network [OSTI]

When deciding on the best strategy for replacing heifers, beef cattle producers should weigh several factors. This publication discusses several such issues, including current and future market prices; herd size; pastures, facilities and management...

Cleere, Jason

2006-01-02T23:59:59.000Z

105

Anytime Replanning Using Local Subplan Replacement  

E-Print Network [OSTI]

Anytime Replanning Using Local Subplan Replacement A Dissertation Presented to the faculty how local subplan replacement can be utilized to implement an anytime planning system that devises new plans to accommodate plan failures. Local subplan replacement consists of selecting subsequences

Ferrer, Gabriel J.

106

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant  

E-Print Network [OSTI]

of the Bureau of Reclamation’s evaluation of proposed projects: c60 Number of acre-feet of water saved per dollar of construction costs; c60 Number of British Thermal Units (BTU) of energy saved per dollar of construction costs; and c60 Dollars of annual... Documentation for Sonia Kaniger, March, 2003 Manager, Cameron County Irrigation District No. 2 (San Benito) page ii of 82 associated with energy savings. There are energy savings both from pumping less water forthcoming from reducing leaks and from improving...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2003-01-01T23:59:59.000Z

107

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect (OSTI)

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

108

Stanford University Mercury Thermometer Replacement  

E-Print Network [OSTI]

Stanford University Mercury Thermometer Replacement Program Instructions for Reuniting Separated Fluid Column of Non-Mercury Thermometer Heating Method Heat the thermometers bulb in an upright position of the thermometer. Note that over filling the expansion chamber will break the thermometer. Tap the thermometer

109

REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni  

E-Print Network [OSTI]

REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni: It is our understanding that you need to replace your original diploma. We are glad to help you attain a replacement diploma. The items listed below are required replacement diploma. Please feel free to contact the LGBT Center at 617-627-3770 if you have questions

Dennett, Daniel

110

Acquisition and Project Management Awards Presentations - Ingrid...  

Energy Savers [EERE]

- Ingrid Kolb, Director, Office of Management Secretary's Achievement Award Seismic Life-Safety, Modernization & Replacement (Seismic Ph 2)Secretary's Award for Project...

111

Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB...  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the...

112

OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement  

Broader source: Energy.gov [DOE]

With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

113

Kittiwakes strategically reduce investment in replacement clutches  

E-Print Network [OSTI]

Kittiwakes strategically reduce investment in replacement clutches Julien Gasparini1,*, Alexandre). In birds, egg production is lower in replacement clutches than in first clutches, but it is unknown whether the replacement clutch is produced) or from a strategic allocation of resources between the two breeding attempts

Alvarez, Nadir

114

General Adaptive Replacement Policies Yannis Smaragdakis  

E-Print Network [OSTI]

General Adaptive Replacement Policies Yannis Smaragdakis College of Computing Georgia Institute of Technology yannis@cc.gatech.edu ABSTRACT We propose a general scheme for creating adaptive replace- ment any two existing replacement policies so that the resulting policy provably can never perform worse

Smaragdakis, Yannis

115

Cooperative Determination on Cache Replacement Candidates  

E-Print Network [OSTI]

Cooperative Determination on Cache Replacement Candidates for Transcoding Proxy Caching Keqiu Li1- mination on cache replacement candidates for transcoding proxies. An original model which determines cache replacement candidates on all can- didate nodes in a coordinated fashion with the objective of minimizing

Chin, Francis Y.L.

116

Replacement Diploma Request University of Massachusetts Lowell  

E-Print Network [OSTI]

Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 883. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

Massachusetts at Lowell, University of

117

Cache Replacement Policy Revisited Mohamed Zahran  

E-Print Network [OSTI]

Cache Replacement Policy Revisited Mohamed Zahran Electrical Engineering Department City University of New York mzahran@ccny.cuny.edu Abstract Cache replacement policy is a major design parameter of any memory hierarchy. The efficiency of the replace- ment policy affects both the hit rate and the access la

Zahran, Mohamed M.

118

Article ID #eqr106 REPLACEMENT STRATEGIES  

E-Print Network [OSTI]

Article ID #eqr106 REPLACEMENT STRATEGIES Elmira Popova Associate Professor, Department)-296-5795 e-mail: popovai@seattleu.edu Corresponding Contributor: Elmira Popova Keywords: Replacement Policies define what is a replacement policy for a system that fails randomly in time and its main characteristics

Popova, Elmira

119

Replacement Diploma Request University of Massachusetts Lowell  

E-Print Network [OSTI]

Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 220. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

Massachusetts at Lowell, University of

120

Type-Logical Hyperedge Replacement Grammars  

E-Print Network [OSTI]

Type-Logical and Hyperedge Replacement Grammars Draft Richard Moot LaBRI (CNRS), INRIA Bordeaux SW2009 #12;CONTENTS 1 Introduction 1 2 Hyperedge Replacement Grammars 3 2.1 Hypergraphs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.2 Hyperedge Replacement . . . . . . . . . . . . . . . . . . . . . . . 4 2.3 Hyperedge

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

PeopleAdmin Staff Straight Replacement  

E-Print Network [OSTI]

1 PeopleAdmin ­ Staff Straight Replacement Guide #12;2 The staff straight replacement module will be used by hiring managers to request vacant, benefited positions be advertisedAdmin system, you will see this view. To begin the staff straight replacement process, you should click BEGIN

Hutcheon, James M.

122

Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project  

SciTech Connect (OSTI)

Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-24T23:59:59.000Z

123

Duct Chase Sprinkler Replacement Project (4594), 5/31/2012  

Broader source: Energy.gov (indexed) [DOE]

1021, Subpart D, Appendix B; (5) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed...

124

Categorical Exclusion 4567, MPLE Test Stand Replacement Project  

Broader source: Energy.gov (indexed) [DOE]

material DB3.6 - R&D or pilot facility DB3.7 * New infill exploratory, experimental oilgasgeothermal constructionoperation DB3.8 - Outdoor ecologicalenvironmental research...

125

Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions  

E-Print Network [OSTI]

Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions vessels to use non-qualifying vessels in the sector, thus allowing replacement of a lost qualifying vessel of the CRP ambiguous as to whether replacement of qualifying vessels with non-qualifying vessels

126

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement  

SciTech Connect (OSTI)

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

Noel Duckwitz

2011-05-01T23:59:59.000Z

127

LED Replacements for Linear Fluorescent Lamps Webcast  

Broader source: Energy.gov [DOE]

In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

128

Optimal scheduling for replacing perimeter guarding unmanned ...  

E-Print Network [OSTI]

difference between charging batteries, automatically replacing batteries [11] or ... the discussion below to the use of batteries and battery charge, without loss of ...

2014-08-20T23:59:59.000Z

129

Vehicle Technologies and Bus Fleet Replacement Optimization  

E-Print Network [OSTI]

1 Vehicle Technologies and Bus Fleet Replacement Optimization: problem properties and sensitivity: R41 #12;2 Abstract This research presents a bus fleet replacement optimization model to analyze hybrid and conventional diesel vehicles, are studied. Key variables affecting optimal bus type

Bertini, Robert L.

130

Page Replacement Algorithms To use a simulation for evaluating various page replacement algorithms studied in class.  

E-Print Network [OSTI]

Operating Systems CSI3131 Lab 4 Winter 2011 Page Replacement Algorithms Objective To use a simulation for evaluating various page replacement algorithms studied in class. Description (Please read to compare the performance of each page replacement algorithm. The constructor of this class contains

Stojmenovic, Ivan

131

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

132

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

133

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

134

Project examples Install new HVAC, electrical, fire protection,  

E-Print Network [OSTI]

Project examples Install new HVAC, electrical, fire protection, and plumbing systems in Mechanical. · Totransformthisspaceandincreaseaccessibility, anelevatorisrequired.Currently,Blakelydoesnot haveone. Replace HVAC and electrical system

Blanchette, Robert A.

135

Secretary Moniz Announces New Biofuels Projects to Drive Cost...  

Energy Savers [EERE]

waste materials and algae can directly replace gasoline and other fuels in our gas tanks and refineries. The research projects announced today build on the Energy Department's...

136

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

137

Replacement solvents for use in chemical synthesis  

DOE Patents [OSTI]

Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

2001-05-15T23:59:59.000Z

138

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

139

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

140

Organic agriculture cannot replace conventional agriculture  

E-Print Network [OSTI]

Organic agriculture cannot replace conventional agriculture Sina Adl , David Iron and Theodore Agriculture | Pathogen Dispersal Introduction Organic farming [1, 2] is gaining in popularity in Eu- rope, because or- ganic agriculture avoids using environmentally harmful chem- icals that pollute soil

Kolokolnikov, Theodore

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Marin County- Wood Stove Replacement Rebate Program  

Broader source: Energy.gov [DOE]

The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

142

Beyond the Replacement Paradigm: Smart Lighting  

E-Print Network [OSTI]

Switches · Smart Building & Grid Interfaces · Efficient full spectrum LEDs without droop · Versatile, low - Visible Light Communications Integration of smart fixtures, networked sensors and control systemsBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

Salama, Khaled

143

Evaluation of alternative sign replacement strategies  

E-Print Network [OSTI]

replacement procedure at the time the new standards go into effect. This will ensure that material, manpower, and other expenditures are minimized, resulting in an overall benefit to TXDOT. Based on this review and analysis, it is recommended that TXDOT...

McCaleb, James Bradley

1996-01-01T23:59:59.000Z

144

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

145

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

146

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

147

A replaceable reflective film for solar concentrators  

SciTech Connect (OSTI)

The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

Not Available

1991-09-01T23:59:59.000Z

148

LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS  

E-Print Network [OSTI]

MIGRATION· PART II: FILE REPLACEMENT ALGORITHMS Alan Jaymay vary even though replacement fi~~d the pa~ameter value PIe N - P ;, RT I r:. fILE REPLACEMENT ALGORITHMS. I.lan ~1ar

Jay Smith, Alan

2011-01-01T23:59:59.000Z

149

REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student Number: _________________________  

E-Print Network [OSTI]

REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student: _________________________ Cheque Date: _____________________ CHEQUE AMOUNT: ________________________ REASON FOR REPLACEMENT Building at the address below. Please indicate how you would like to receive your replacement cheque

Sinnamon, Gordon J.

150

Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars  

E-Print Network [OSTI]

Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars Richard Moot La (tree generating) hyperedge replacement grammars as an intermediate step. As a consequence both, using hyperedge replacement grammars as an intermediate step. 2 Tree Adjoining Grammars and Hyperedge

Paris-Sud XI, Université de

151

[Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for locating exterior signsOP 61.22 [Minor revision­posted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure approval, a Project Request (Attachment B, OP 61.28) will be forwarded to Operations Division Maintenance

Rock, Chris

152

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of...

153

Magnesium Replacement of Aluminum Cast Components in a Production...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Magnesium Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a...

154

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network [OSTI]

No. 894 Effects of an Accelerated Diesel Engine Replacement/2009 Effects of an Accelerated Diesel Engine Replacement/reductions occurring on an accelerated schedule compared to

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

155

Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

156

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

157

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

158

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

159

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

160

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Valve assembly having remotely replaceable bearings  

DOE Patents [OSTI]

A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

Johnson, Evan R. (San Diego, CA); Tanner, David E. (Poway, CA)

1980-01-01T23:59:59.000Z

162

Measure Guideline: Window Repair, Rehabilitation, and Replacement  

SciTech Connect (OSTI)

This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

Baker, P.

2012-12-01T23:59:59.000Z

163

Reversing Wolbachia-based population replacement  

E-Print Network [OSTI]

Wolbachia bacteria as a vehicle for population replace- ment. Also discussed are strategies strategies and provide mechan- isms for the autonomous spread of desired transgenes into the targeted relative to the natural population [15­17]. Primary candidates for gene-drive strategies are autonomous

Dobson, Stephen L.

164

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK!  

E-Print Network [OSTI]

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK! Did you know, mercury from broken thermometers to the local environment, if broken thermometers in sinks eventually end at the sanitary sewer plant. Broken mercury thermometers create hazardous waste that is costly to clean up and costly to dispose of. Other

165

THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES  

E-Print Network [OSTI]

THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES JOSEPH PREVITE, MICHELLE PREVITE, AND MARY a vertex replacement rule given by exactly one replacement graph generates an infinite graph for the growth degree of infinite graphs with polynomial growth that are gener- ated by vertex replacement rules

Previte, Joseph P.

166

Orthopaedic Surgery Center of Joint Preservation and Replacement  

E-Print Network [OSTI]

Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Hip Replacement new hip! You are going home after a successful total hip replacement. Although there is still much. The benefits of a total hip replacement are great, but they do take a while to be realized. Hip Precautions

Oliver, Douglas L.

167

Orthopaedic Surgery Center of Joint Preservation and Replacement  

E-Print Network [OSTI]

Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Knee Replacement are going home after a successful total knee replacement. Although there is still much work to do, we have replacement are great, but they do take a while to be realized. We have put together some helpful hints

Oliver, Douglas L.

168

UA Museum Expansion Project Project Manager: Carol Adamczak, 474-7362  

E-Print Network [OSTI]

. Life/Safety Renovation. Complete by February 07. Patty Ice Rink Improvements Project Manager: Marc of the Patty Ice Arena. Install new dehumidification and water treatment system inside the rink. Replace

Ickert-Bond, Steffi

169

ENVIRONMENTAL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

as replacement conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed powerlines ... " C. Regnlatory...

170

Microsoft Word - CX_Mint_Farm_BAA.doc  

Broader source: Energy.gov (indexed) [DOE]

changing insulators, and replacement of poles, circuit breakers, conductors, transformer, and crossarms. Location: Dittmer Control Center, Vancouver, WA; Munro Control...

171

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

172

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

173

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement  

SciTech Connect (OSTI)

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

Noel Duckwtiz

2011-05-01T23:59:59.000Z

174

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...  

Energy Savers [EERE]

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, 2014 - 9:33am...

175

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network [OSTI]

end users to select the most energy efficient equipment when replacing motors, motor drives, transformers, lamps, ballasts, etc., given costs associated with energy consumption when compared with installation. The selection of replacement parts...

Massey, G. W.

2005-01-01T23:59:59.000Z

176

Replaces DOE F 5120.2  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of50.2700.2

177

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

178

The opportunistic replacement problem: analysis and case studies  

E-Print Network [OSTI]

Jan 22, 2009 ... Abstract: We consider an optimization model for determining optimal opportunistic maintenance (that is, component replacement) schedules ...

Torgny Almgren

2009-01-22T23:59:59.000Z

179

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: ÂŁ500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

180

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: ÂŁ3,500,000 Funding Source: SRIF III Construction Project Programme: Start

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Computer Replacement Guidelines Environmental Health and Safety, Stanford University  

E-Print Network [OSTI]

Computer Replacement Guidelines Environmental Health and Safety, Stanford University 17 November 2005 This document describes the guidelines for replacing laptop and desktop computers at Environmental Health and Safety. PC laptop and desktop computers will be replaced a) on an ongoing basis where

182

Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1  

E-Print Network [OSTI]

Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1 , Lawrence B. Holder2 , and Diane J@eecs.wsu.edu Abstract We describe an algorithm and experiments for inference of edge replacement graph grammars for inference of Node Replacement Recursive Graph Grammars [7]. In this paper we describe an approach

Holder, Lawrence B.

183

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

1 FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; 2 L'ECUYER, MARTIN, AND V ' AZQUEZ

L'Ecuyer, Pierre

184

1 INTRODUCTION The replacement investment decision is clearly a  

E-Print Network [OSTI]

1 INTRODUCTION The replacement investment decision is clearly a strategic objective of a company for the replacement decision largely depends on the company context. However, we can summarize the motivations leading over time and prove that the replacement policy at equal intervals is optimum. However, the linear

Paris-Sud XI, Université de

185

Application for Amendment 80 Vessel Replacement Page 1 of 6  

E-Print Network [OSTI]

Application for Amendment 80 Vessel Replacement Page 1 of 6 Revised: 12/23/2013 OMB Control No. 0648-0565 Expiration Date: 01/31/2016 APPLICATION FOR AMENDMENT 80 VESSEL REPLACEMENT United States OF THE AMENDMENT 80 VESSEL BEING REPLACED 1. Vessel Name: 2. ADF&G Vessel Registration No.: 3. USCG Documentation

186

Page Replacement and Reference Bit Emulation in Mach  

E-Print Network [OSTI]

Page Replacement and Reference Bit Emulation in Mach Richard P. Draves rpd@cs.cmu.edu School of Computer Science Carnegie Mellon University 5000 Forbes Avenue Pittsburgh, PA 15213 Abstract A page­replacement in software. This paper describes the Mach kernel's page­replacement algorithm and considers three software

187

The Cosmic Origins Spectrograph: A Hubble Replacement Instrument  

E-Print Network [OSTI]

The Cosmic Origins Spectrograph: A Hubble Replacement Instrument for the 2002 Reservicing Mission Origins Spectrograph (COS) has recently been selected as a replacement instrument for the Hubble Space Telescope. Installation is scheduled for late 2002, replacing COSTAR, which at that time will be unnecessary

Colorado at Boulder, University of

188

Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY  

E-Print Network [OSTI]

Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY Updated: 08/26/09 Use this form to request a replacement or additional diploma. · The name on your diploma must be the same the Registrar's Office, Registration and Records Division prior to requesting your replacement diploma

Feschotte, Cedric

189

Cache Replacement Policy Using Map-based Adaptive Insertion  

E-Print Network [OSTI]

Cache Replacement Policy Using Map-based Adaptive Insertion Yasuo Ishii The University of Tokyo insertion policy (MAIP) for a novel cache replacement. The MAIP estimates the data reuse possibility policy. 1. INTRODUCTION The cache replacement policy plays an important role in improving system

Paris-Sud XI, Université de

190

University of Utah Payroll Department Stop Payment -Replacement Form  

E-Print Network [OSTI]

University of Utah Payroll Department Stop Payment - Replacement Form Affidavit to request replacement of a lost, stolen, or damaged, payroll check. Please note that it takes 5 to 7 days to process is given to induce a replacement check for one originally issued. 3. I agree to indemnify and hold

Provancher, William

191

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ

Vázquez-Abad, Felisa J.

192

Node discovery and replacement using mobile Kalypso Magklara1  

E-Print Network [OSTI]

Node discovery and replacement using mobile robot Kalypso Magklara1 , Dimitrios Zorbas1 and Tahiry, that discovers the nodes around it and replaces the active nodes, whose energy is drained, by fully charged and that decide, which nodes to replace. We simulate our algorithms and our findings show that all nodes that fail

Paris-Sud XI, Université de

193

REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE  

E-Print Network [OSTI]

REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE Administration Building, Room 110-3169 The replacement diploma will bear the signatures of the current University President and Registrar and have the words Replacement Diploma printed under the university seal. Allow 3-4 weeks for delivery. You

Barrash, Warren

194

The iA{beta}5p {beta}-breaker peptide regulates the A{beta}(25-35) interaction with lipid bilayers through a cholesterol-mediated mechanism  

SciTech Connect (OSTI)

Highlights: Black-Right-Pointing-Pointer iA{beta}5p shows a significant tendency to deeply penetrates the hydrophobic core of lipid membrane. Black-Right-Pointing-Pointer A{beta}(25-35) locates in the external region of the membrane causing a re-positioning of CHOL. Black-Right-Pointing-Pointer iA{beta}5p withholds cholesterol in the inner hydrophobic core of the lipid membrane. Black-Right-Pointing-Pointer iA{beta}5p prevents the A{beta}(25-35) release from the lipid membrane. -- Abstract: Alzheimer's disease is characterized by the deposition of aggregates of the {beta}-amyloid peptide (A{beta}) in the brain. A potential therapeutic strategy for Alzheimer's disease is the use of synthetic {beta}-sheet breaker peptides, which are capable of binding A{beta} but unable to become part of a {beta}-sheet structure, thus inhibiting the peptide aggregation. Many studies suggest that membranes play a key role in the A{beta} aggregation; consequently, it is strategic to investigate the interplay between {beta}-sheet breaker peptides and A{beta} in the presence of lipid bilayers. In this work, we focused on the effect of the {beta}-sheet breaker peptide acetyl-LPFFD-amide, iA{beta}5p, on the interaction of the A{beta}(25-35) fragment with lipid membranes, studied by Electron Spin Resonance spectroscopy, using spin-labeled membrane components (either phospholipids or cholesterol). The ESR results show that iA{beta}5p influences the A{beta}(25-35) interaction with the bilayer through a cholesterol-mediated mechanism: iA{beta}5p withholds cholesterol in the inner hydrophobic core of the bilayer, making the interfacial region more fluid and capable to accommodate A{beta}(25-35). As a consequence, iA{beta}5p prevents the A{beta}(25-35) release from the lipid membrane, which is the first step of the {beta}-amyloid aggregation process.

Vitiello, Giuseppe [Department of Chemistry, University of Naples 'Federico II', Naples (Italy) [Department of Chemistry, University of Naples 'Federico II', Naples (Italy); CSGI (Consorzio per lo Sviluppo dei Sistemi a Grande Interfase), Florence (Italy)] [Consorzio per lo Sviluppo dei Sistemi a Grande Interfase; Italy; Grimaldi, Manuela; D'Ursi, Anna Maria [Department of Pharmaceutical Science, University of Salerno, Fisciano (Italy)] [Department of Pharmaceutical Science, University of Salerno, Fisciano (Italy); D'Errico, Gerardino, E-mail: gerardino.derrico@unina.it [Department of Chemistry, University of Naples 'Federico II', Naples (Italy) [Department of Chemistry, University of Naples 'Federico II', Naples (Italy); CSGI (Consorzio per lo Sviluppo dei Sistemi a Grande Interfase), Florence (Italy)] [Consorzio per lo Sviluppo dei Sistemi a Grande Interfase; Italy

2012-01-06T23:59:59.000Z

195

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

196

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

197

Application for Replacement JCU Award (Certificate/Testamur) -FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD  

E-Print Network [OSTI]

Application for Replacement JCU Award (Certificate/Testamur) - FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD (CERTIFICATE/TESTAMUR) 1. PERSONAL DETAILS JCU Student Number (8 digits): Title: rDr r after the fee is paid. · Replacement Testamurs - $70 (Diploma, Bachelor, Master and Doctoral

198

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: ÂŁ60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

199

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

200

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: ÂŁ1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base ...

rroames

2010-01-12T23:59:59.000Z

202

Application Form for Replacement Diploma/Program Certificate (Form must be notarized)  

E-Print Network [OSTI]

Application Form for Replacement Diploma/Program Certificate (Form must be notarized) Complete to Princeton University as follows: Replacement Diploma - $75 Replacement Program Certificate - $30 Please

203

Project W-320, 241-C-106 sluicing electrical calculations, Volume 2  

SciTech Connect (OSTI)

This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.

Bailey, J.W.

1998-08-07T23:59:59.000Z

204

Polymeric materials replacement issues for the LANL stockpile.  

SciTech Connect (OSTI)

A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

2002-01-01T23:59:59.000Z

205

Nucla CFB Demonstration Project  

SciTech Connect (OSTI)

This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

Not Available

1990-12-01T23:59:59.000Z

206

Energy Savings Performance Contracts (4494)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

replace approximately 760 steam traps and 60 vacuum breakers; update the condensate return system with pipe, insulation, and pumptank units; replace pumps and install controls in...

207

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

208

Replacement of the Advanced Test Reactor control room  

SciTech Connect (OSTI)

The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab.

Durney, J.L.; Klingler, W.B. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

1989-01-01T23:59:59.000Z

209

arthroplasty replacement: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

210

androgen replacement therapy: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 153 LATTICE PATHS, SAMPLING...

211

arthroplasty replacement hip: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 144 LATTICE PATHS, SAMPLING...

212

New Feedstocks and Replacement Fuels - Future Energy for Mobility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuels - Future Energy for Mobility New Feedstocks and Replacement Fuels - Future Energy for Mobility Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan....

213

New Feedstocks and Replacement Fuel Diesel Engine Challenges...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Diesel Engine Challenges New Feedstocks and Replacement Fuel Diesel Engine Challenges Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the...

214

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quenching and Partitioning Process ADVANCED MANUFACTURING OFFICE Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Novel...

215

FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART 1.  

E-Print Network [OSTI]

FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART F. McDONOUGH*** ABSTRACT. Replacement dolomite in the Latemar carbonate buildup, northern Italy of vertical columns (replacement of limestone breccia pipes) and sheets (replacement along fractures

Carmichael, Sarah

216

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

217

Boulder Canyon Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

November 2015 * All work is contingent on outage availability Hoover Instrument Transformer Replacement * 6 out the 12 have been replaced * 3 of the remaining will be done in...

218

Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication  

SciTech Connect (OSTI)

A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

Megan Donahue

2009-02-24T23:59:59.000Z

219

CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING  

E-Print Network [OSTI]

CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING Authors: · James H Hines (MIT changes are needed. The paper describes an extensive experiment with using this approach to construct with another molecule. Using this tool kit, users can rapidly construct new simulation models by replacing

220

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS  

E-Print Network [OSTI]

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after

Cizelj, Leon

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied ...

222

use finance june 30 2014.htm[7/25/2014 12:03:12 PM] PROJECT DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE  

E-Print Network [OSTI]

by MSU in support of the DOE's mission. FRIB builds on MSU's leadership in nuclear physics developed DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 3 Clinical Center - C-Wing HVAC Replacement, ventilation, and air conditioning (HVAC) system and the conversion of space to procedure rooms is necessitated

223

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement  

SciTech Connect (OSTI)

The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

David E. Korns

2012-05-01T23:59:59.000Z

224

Sustainable LED Fluorescent Light Replacement Technology  

SciTech Connect (OSTI)

Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. • Drill-down Review – These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

None

2011-06-30T23:59:59.000Z

225

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors  

SciTech Connect (OSTI)

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

Noel Duckwitz

2011-05-01T23:59:59.000Z

226

Summer Projects 2013 Major Capital Projects  

E-Print Network [OSTI]

;Hanszen College ­ New Wing Fan Coil Unit Replacement #12;#12;Mudd Lab High Voltage Automatic Transfer

Alvarez, Pedro J.

227

Collector main replacement at Indianapolis Coke  

SciTech Connect (OSTI)

Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

Sickle, R.R. Van

1997-12-31T23:59:59.000Z

228

EDITORIAL ESSAY A "Manhattan Project" for climate change?  

E-Print Network [OSTI]

abatement of greenhouse-gas emissions would require not only replacing carbon-intensive fuels (like coal of a "Manhattan Project" on Climate Change would be low-carbon technologies for energy generation and useEDITORIAL ESSAY A "Manhattan Project" for climate change? Chi-Jen Yang & Michael Oppenheimer

Oppenheimer, Michael

229

Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin  

SciTech Connect (OSTI)

The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

David Brien

2012-06-21T23:59:59.000Z

230

Cornell's (LSC) project began providing 16,000 tons of cooling (1 ton of cooling = 12,000 Btu/hr, or approximately one large residential window air conditioner) to Cornell University's Ithaca  

E-Print Network [OSTI]

window air conditioner) to Cornell University's Ithaca campus in July of 2000. This project has almost completely replaced mechanical refrigeration for the Cornell district cooling system with the following benefits: · Greater LSC has replaced

Keinan, Alon

231

Drop-in replacement biofuels : meeting the challenge  

E-Print Network [OSTI]

This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

Bhargava, Alok (Alok Kishore)

2011-01-01T23:59:59.000Z

232

Washington State Department of Ecology: Replacement Wells Requiring...  

Open Energy Info (EERE)

Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

233

Laboratory Evaluation of LED T8 Replacement Lamp Products  

SciTech Connect (OSTI)

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

234

Ultrasound image guided acetabular implant orientation during total hip replacement  

DOE Patents [OSTI]

A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

2003-08-19T23:59:59.000Z

235

Replace Pressure-Reducing Valves with Backpressure Turbogenerators  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

236

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

237

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

238

Replacing Motors Counting Savings: Results from a 100 Motor Study  

E-Print Network [OSTI]

REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors’ operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

Kaufman, N. M.

2006-01-01T23:59:59.000Z

239

Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each  

E-Print Network [OSTI]

Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each replacement diploma is $25.00 ($35.00 for D.M.D, J.D., LL.M., and M.D). Please fill out the applicable information and mail it to the address below. Replacement

Guenther, Frank

240

Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology  

SciTech Connect (OSTI)

This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

2012-07-16T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2  

E-Print Network [OSTI]

Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2 1 Carl v. Ossietzky. TAGT'98, Universitat-GH Paderborn, 182-189, 1998. Node replacement and hyperedge replacement are two, we combine both concepts to a concept of atom replacement that allows the replacement of the atomic

Habel, Annegret

242

Repair and Replacement projects help FM to honor its commitment to  

E-Print Network [OSTI]

of the University. Services provided fall into three major categories: preventive maintenance, routine repairs friendly power. Energy Management is continually recognized for the superior maintenance. · Maintenance (www.facm.umn. edu/services/maintenance.html) Maintenance Operations preserves the physical assets

Gulliver, Robert

243

Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012  

Broader source: Energy.gov (indexed) [DOE]

l 021, Subpart D, Appendix B; (5) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed...

244

The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe Energy DepartmentCategory 2 Nuclear Facility |Radioactive

245

Wild Rose SFH DNR's largest facility Total Replacement Project Engineering Study RAS Intensive Rearing  

E-Print Network [OSTI]

liquid oxygen tank #12;Remote controls for production wells in coldwater headtank building (HDR Senior 2,400 gpm 75 deg F 2-Stage Water Heating Heat Recovery Finish Heating #12;Moving Bed Biofilter & K1

246

Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles  

E-Print Network [OSTI]

Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles replacement cycles are commonly observed in tropical cyclones and are well known to cause fluctuations associated with eyewall replacement cycles in Atlantic Ocean hurricanes. The model input comprises

Kossin, James P.

247

Functional replacement of a primary metabolic pathway via multiple independent eukaryote-to-eukaryote gene transfers  

E-Print Network [OSTI]

Functional replacement of a primary metabolic pathway via multiple independent eukaryote can be added to the recipient's gene complement (gene additions) or simply replace existing endogenous counterparts (functional replacements). The recruitment of novel genes is thought to allow the recipient

Nedelcu, Aurora M.

248

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

249

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

250

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

251

Microstructure, Mechanical Behavior, and Clinical Trade-offs in Ultra-High Molecular Weight Polyethylene for Total Joint Replacement  

E-Print Network [OSTI]

components for total joint replacement. J Bone Joint Surgcontemporary total knee replacements. Clin Orthop Relat Res(wear in total joint replacement? J Am Acad Orthop Surg, 16

Atwood, Sara Anne

2010-01-01T23:59:59.000Z

252

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

253

UIUC Collector Erosion and Optical Lifetime Project Results: Time Dependent Exposures  

E-Print Network [OSTI]

UIUC Collector Erosion and Optical Lifetime Project Results: Time Dependent Exposures Darren A is the lifetime of collector optics. Frequent replacement of the mirror system will detract from the economic

Spila, Timothy P.

254

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

255

Replacing the whole barrel of oil with plants and microbes  

SciTech Connect (OSTI)

In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

Simmons, Blake

2013-05-29T23:59:59.000Z

256

New energy replacement method for resonant power supplies  

SciTech Connect (OSTI)

The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab.

Karady, G.G.; Thiessen, H.A.

1989-01-01T23:59:59.000Z

257

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

258

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

259

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?  

E-Print Network [OSTI]

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

Colorado at Boulder, University of

260

Replacing the whole barrel of oil with plants and microbes  

ScienceCinema (OSTI)

In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

Simmons, Blake

2014-06-24T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data Mining For Prediction of Aircraft Component Replacement  

E-Print Network [OSTI]

Data Mining For Prediction of Aircraft Component Replacement Sylvain Letourneau1 Fazel Famili1 Stan the number of delays, and increasing the overall level of safety. Several data mining techniques exist from the data obtained during the operation and maintenance of aircraft is extremely challenging. Di

Matwin, Stan

262

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

263

Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures  

E-Print Network [OSTI]

Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures Diego R discuss the behavior of the replacement mechanism of well-known COMA protocols applied to a loosely replacement mecha- nism in order to select the destination node of a replacement transaction without

Llanos, Diego R.

264

Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2  

E-Print Network [OSTI]

1 Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2 3.1016/j.jcrysgro.2012.02.040 #12;2 Abstract16 Olivine mineral replacement by serpentine is one major replaced by18 chrysotile and brucite under high alkaline conditions. In our study, olivine replacement19

Paris-Sud XI, Université de

265

University of South Carolina Office of the University Registrar Request for Replacement Diploma  

E-Print Network [OSTI]

University of South Carolina Office of the University Registrar P F Request for Replacement Diploma Please Note Replacement diplomas are duplicates of the original diploma issued by USC. A request on the replacement diploma will reflect those of the current University Officers. Replacements can take up to 90 days

Almor, Amit

266

Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement  

E-Print Network [OSTI]

Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement on known causes for insufficiencies of transcutaneous heart valve replacements. Out of that information

Berlin,Technische Universität

267

Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25, 2012)  

E-Print Network [OSTI]

Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25 or Replacement of an Investigator's Brochure or Product Monograph This form replaces a letter of explanation from or replacement of an Investigator's Brochure Page 2 of 2 (Version: January 25, 2012) 5) List all forms

Shoubridge, Eric

268

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

269

Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and  

E-Print Network [OSTI]

Page | 1 Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and return this form to Examinations students You will not be charged for this service. A replacement transcript can be supplied

Neirotti, Juan Pablo

270

Safeguards and Security Program and Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The proposed revision to this Department of Energy Guide focuses on alignment of guidance for implementing key safeguard and security components to the DOE capital asset acquisition process with the revised DOE O 413.3B, Program and Project Management for Acquisition of Capital Assets, the revised DOE O 470.4B, Safeguard and Security Program, and the new series of DOE Orders replacing the DOE M 470.4 series of manuals.

2013-04-18T23:59:59.000Z

271

Microsoft Word - DOE-ID-INL-10-020.doc  

Broader source: Energy.gov (indexed) [DOE]

replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed transmission lines, in accordance,...

272

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms." C. Regulatorv Requirements in 10 CFR 1021.410 (b): 1. The proposed...

273

DATE  

Broader source: Energy.gov (indexed) [DOE]

replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed transmission lines N. Routine...

274

ENVIRONMENTAL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

as replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed powerlines, in accordance, where...

275

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

as replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed powerlines, in accordance, where...

276

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

poles, circuit insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossanns. C. Regulatory Requirements in 10 CFR 1021.410 (b): (See full text...

277

ENVIRONMENTAL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

as replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed power lines, in accordance, where...

278

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. B4.11 Electric power substations and interconnection facilities...

279

In Yuma County, Arizona and Imperial County, California RECORD...  

Broader source: Energy.gov (indexed) [DOE]

changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms." B. Regulatory Requirements in 10 CFR 1021.410 (b): 1. The...

280

and Imperial County, California RECORD OF CATEGORICAL EXCLUSION...  

Broader source: Energy.gov (indexed) [DOE]

changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms." C, Regulatory Requirements in 10 CFR 1021.410 (b): 1. The...

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

282

Stochastic Ratchet Mechanisms for Replacement of Proteins Bound to DNA  

E-Print Network [OSTI]

Experiments indicate that unbinding rates of proteins from DNA can depend on the concentration of proteins in nearby solution. Here we present a theory of multi-step replacement of DNA-bound proteins by solution-phase proteins. For four different kinetic scenarios we calculate the depen- dence of protein unbinding and replacement rates on solution protein concentration. We find (1) strong effects of progressive 'rezipping' of the solution-phase protein onto DNA sites liberated by 'unzipping' of the originally bound protein; (2) that a model in which solution-phase proteins bind non-specifically to DNA can describe experiments on exchanges between the non specific DNA- binding proteins Fis-Fis and Fis-HU; (3) that a binding specific model describes experiments on the exchange of CueR proteins on specific binding sites.

Simona Cocco; John F. Marko; Remi Monasson

2014-05-26T23:59:59.000Z

283

Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement  

SciTech Connect (OSTI)

This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

Springer, D.; Dakin, B.

2013-03-01T23:59:59.000Z

284

Solar Thermal Demonstration Project  

SciTech Connect (OSTI)

HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with â??Kalwallâ?? building panels. An added feature of the â??Kalwallâ?ť system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

Biesinger, K.; Cuppett, D.; Dyer, D.

2012-01-30T23:59:59.000Z

285

The National Energy Policy Act and lamp replacement options  

SciTech Connect (OSTI)

The National Policy Act of 1992 involves the creation of energy efficiency standards for a wide range of products including fluorescent and incandescent lamps. Minimum efficacy (lumens per watt) and color rendering index (CRI) standards are mandated for the popular fluorescent lamps: four-foot medium bi-pin, two-foot U-bent, eight-foot slimline and eight-foot high output. Minimum efficacies are mandated for specific incandescent R and PAR reflector lamps. These standards will affect selected colors and designs of fluorescent lamps, the most significant being the standard lamps in the cool white and warm white colors. The incandescent reflector lamps will include the R-30, R-40, PAR-38 lamps above 40 watts, excluding the halogen types. These efficiency and color rendering standards will require end-users and specifiers to select replacement fluorescent lamps from a range of performance characteristics (lumen output, efficacy, CRI and price). The choice of replacement for the R and PAR incandescent lamps will include the halogen designs and compact fluorescent designs. In this paper, replacement options will be analyzed and discussed and the effect of these options on the performance of the lighting system will be explored in detail.

Ryerson, C.

1995-06-01T23:59:59.000Z

286

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

287

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

288

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

289

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

290

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

291

Project Name Work Description -as Approv Aug 09 Anchorage Harbor,  

E-Print Network [OSTI]

; perform energy upgrades; replace underground fuel tank and heating system to meet Environmental CompliancePrimary State Corps District Project Name Work Description - as Approv Aug 09 Planned Allocation excessive maintenance. Reduces future maintenance costs. 1,000,000 AL Mobile Alabama River Lakes, AL Award 8

US Army Corps of Engineers

292

The Methanol Economy Project  

SciTech Connect (OSTI)

The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO{sub 2} capture using supported amines, co-electrolysis of CO{sub 2} and water to formate and syngas, decomposition of formate to CO{sub 2} and H{sub 2}, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields. ? Direct electrophilic bromination of methane to methyl bromide followed by hydrolysis to yield methanol was investigated on a wide variety of catalyst systems, but hydrolysis proved impractical for large-scale industrial application. ? Bireforming the correct ratio of methane, CO{sub 2}, and water on a NiO / MgO catalyst yielded the right proportion of H{sub 2}:CO (2:1) and proved to be stable for at least 250 hours of operation at 400 psi (28 atm). ? CO{sub 2} capture utilizing supported polyethyleneimines yielded a system capable of adsorbing CO{sub 2} from the air and release at nominal temperatures with negligible amine leaching. ? CO{sub 2} electrolysis to formate and syngas showed considerable increases in rate and selectivity by performing the reaction in a high pressure flow electrolyzer. ? Formic acid was shown to decompose selectively to CO{sub 2} and H{sub 2} using either Ru or Ir based homogeneous catalysts. ? Direct formic acid fuel cells were also investigated and showed higher than 40% voltage efficiency using reduced loadings of precious metals. A technoeconomic analysis was conducted to assess the viability of taking each of these processes to the industrial scale by applying the data gathered during the experiments to approximations based on currently used industrial processes. Several of these processes show significant promise for industrial scale up and use towards improving our nation’s energy independence.

Olah, George; Prakash, G.K.

2013-12-31T23:59:59.000Z

293

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

294

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

295

A Centrifugal Contactor Design to Facilitate Remote Replacement  

SciTech Connect (OSTI)

Advanced designs of nuclear fuel recycling and radioactive waste treatment plants are expected to include more ambitious goals for solvent extraction based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. This work continues the development of remote designs for ACCs that can process the large throughputs needed for future nuclear fuel recycling and radioactive waste treatment plants. A three stage, 12.5 cm diameter rotor module has been constructed and is being evaluated for use in highly radioactive environments. This prototype assembly employs three standard CINC V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance. Removal and replacement of the center position V-05R contactor in the three stage assembly was demonstrated using an overhead rail mounted PaR manipulator. Initial evaluation indicates a viable new design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment. Replacement of a single stage via remote manipulators and tools is estimated to take about 30 minutes, perhaps fast enough to support a contactor change without loss of process equilibrium. The design presented in this work is scalable to commercial ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute.

David H. Meikrantz; Jack. D. Law; Troy G. Garn; Lawrence L. Macaluso

2011-03-01T23:59:59.000Z

296

Overview of CFC replacement issues for household refrigeration  

SciTech Connect (OSTI)

In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth`s temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

Vineyard, E.A. [Oak Ridge National Lab., TN (United States); Roke, L. [Fisher and Paykel, Auckland (New Zealand); Hallett, F. [Frigidaire, Washington, DC (United States)

1991-12-31T23:59:59.000Z

297

For Immediate Release --Wednesday, July 4, 2012 Water Pipe Replacement Closes Three Campus Buildings, July  

E-Print Network [OSTI]

1 For Immediate Release -- Wednesday, July 4, 2012 Water Pipe Replacement water supply pipe as well as building isolation valves. The main water to happen again. The pipe replacement is part of a $5.6 million upgrade

Morris, Joy

298

Geography Access Control / Identification Application Application Type: New Update/Addition Replacement Temporary  

E-Print Network [OSTI]

/Addition Replacement Temporary The following is to be completed by the employee (type or print legibly): Last name _____________________ $15 Access & Identification, $10 Identification Card only, $10 replacement fee for either Affiliation

California at Santa Barbara, University of

299

Embryo collection and attempted replacement in the mare  

E-Print Network [OSTI]

embryo collections, was similar to that described by Oguri and Tsutsumi (1980). An 18 gauge Foley 3-way catheter with a 75 cc balloon (Bardex, Bard Hospital Division, C. R. Bard Inc. , Murray Hill, New Jersey) was introduced into the vagina by hand... (Member) J. D. McCrady (Head of Department) August 1983 ABSTRACT Embryo Collection and Attempted Replacement in the Mare (August, 1983) Jane S, Beach, B. S. , Texas A&M University Chairman of advisory committee: Dr. Duane C. Kraemer Embryos were...

Beach, Jane Salisbury

1983-01-01T23:59:59.000Z

300

RandomString is a small web application, containing one java servlet. It allows users to enter a list of strings to be randomly chosen with two options: with replacement or without replacement (default).  

E-Print Network [OSTI]

a list of strings to be randomly chosen with two options: with replacement or without replacement of strings and choosing them randomly with two options: with replacement or without replacement (default strings are separated by carriage return. 2. User selects to randomly choose strings `without replacement

Offutt, Jeff

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Wavelet based analysis of circuit breaker operation  

E-Print Network [OSTI]

and close coil currents (TC or CC in Fig. 4) are most important signals being monitored. Each trip and close coil encloses a plunger that belongs to the operating mechanism. When trip or close coil are energized, the electric-magnetic force on the plunger... ?a? opens the current path to the trip coil. Auxiliary ?a? contact is designed to open when the main contacts begin to open. Trip coil quickly de-energizes and the current returns to zero. 0 50 100 150 200 250 300ms 0 50 100 150 200...

Ren, Zhifang Jennifer

2004-09-30T23:59:59.000Z

302

Industrial Circuit Breakers |GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformation for planningtoA Journey Inside the Complex and Powerful

303

Hanford tank waste operation simulator operational waste volume projection verification and validation procedure  

SciTech Connect (OSTI)

The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement.

HARMSEN, R.W.

1999-10-28T23:59:59.000Z

304

Phase III Proposed Early Restoration Project Alabama Florida Louisiana Mississippi Texas  

E-Print Network [OSTI]

are proposing six recreational use projects in Bay County. As a result of the Deepwater Horizon oil spill Access along Florida's Gulf Coast: City of Mexico Beach Marina project would remove and replace eighteen surface and increasing the width at the existing Mexico Beach Canal Park boat ramp in the City of Mexico

305

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

306

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA  

E-Print Network [OSTI]

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

307

Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1;3 .  

E-Print Network [OSTI]

Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1@zenone.math.unipd.it, cocco@moo.dsi.unive.it, etalle@cwi.nl October 13, 1994 Abstract The simultaneous replacement results for Fitting's and Kunen's semantics. We also show how simultaneous replacement can mimic other

Cocco, Nicoletta

308

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions  

E-Print Network [OSTI]

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

Montes-Hernandez, German

309

Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jimenez  

E-Print Network [OSTI]

Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jim´enez Department of Computer Science The University of Texas at San Antonio Abstract We present a cache replacement and bypass policy driven by dead block prediction. A block is considered dead is it will be replaced before

Paris-Sud XI, Université de

310

evolution via the replacement of two-membrane plastids would have to be  

E-Print Network [OSTI]

evolution via the replacement of two- membrane plastids would have to be accompanied by the origin be easily overcome by assuming that four-membrane plastids have evolved via the replacement of three-membrane plastids would be an example of a secondary (replacement of a prokaryotic by a eukaryotic plastid

McFadden, Geoff

311

Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view  

E-Print Network [OSTI]

Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view-cache replacement policy can be modified for self- performance to be meaningful. Categories and Subject Descriptors multicore processor, quality of service, self-per- formance, shared cache, replacement policy, memory band

Paris-Sud XI, Université de

312

Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT  

E-Print Network [OSTI]

Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT PAGE 1 OF 1, NOVEMBER 2013 REQUEST FOR GRADUATE DIPLOMA REPLACEMENT/REPRINT Return your completed form to: Graduate School Graduate of the replacement diploma. Current graduate diplomas measure 11" by 14". Your diploma will be printed with the legal

Buehrer, R. Michael

313

Biased Replacement Policies for Web Caches: Differential QualityofService and Aggregate User Value \\Lambda  

E-Print Network [OSTI]

Biased Replacement Policies for Web Caches: Differential Quality­of­Service and Aggregate User reduction to different degrees, a replacement policy which priori­ tizes cache space across servers can­frequently­used (LFU) replacement that is sensitive to varying levels of server valuation for cache hits. Through trace

Jamin, Sugih

314

STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM  

E-Print Network [OSTI]

STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-4R TESTING CF-4R-MECH-20 Duct Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings

315

Image-Based Texture Replacement Using Multiview Images Technion Israel Inst. of Technology  

E-Print Network [OSTI]

Image-Based Texture Replacement Using Multiview Images Doron Tal Technion ­ Israel Inst replacement is one such task. It is the process of painting a new texture over an ex- isting textured image for perform- ing texture replacement, which is based on multiview stereo tech- niques that produce depth

Tal, Ayellet

316

Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement  

E-Print Network [OSTI]

100 Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement Dipnil replacement. The purpose of this study was to use computer simulation to study the effects of resecting too-tissue tensions, and articular contact forces. INTRODUCTION Total knee replacement (TKR) is a reliable and widely

Omiecinski, Curtis

317

Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart  

E-Print Network [OSTI]

Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart Department of Computer Science University of Illinois at Urbana­Champaign Figure 1: Replaced materials replacement has wide application through- out the entertainment industry, particularly for post- production

Garland, Michael

318

Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement  

E-Print Network [OSTI]

Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement replacement may out-perform prior-specific training in some aspects of the quality of the estimated posterior, since the prior is known analytically, the posterior can also be estimated by prior replacement. To do

319

Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W. Weide  

E-Print Network [OSTI]

Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W nsridhar,pike,weide @cis.ohio-state.edu Abstract Dynamic module replacement -- the ability to hot swap-neutral technique for dynamic module replacement using Service Facilities (Serfs) -- a pattern- based design

Weide, Bruce W.

320

Replacement Diploma Name Change Office of Records and Registration rev. 06/11  

E-Print Network [OSTI]

Replacement Diploma Name Change Office of Records and Registration rev. 06/11 Clemson University will provide a replacement or additional diploma to graduates of the University for a fee of $50.00 per diploma. Replacement and additional diplomas are printed on paper stock being used by the University at the time

Bolding, M. Chad

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Application for a Replacement Testamur ADM18-V02/14  

E-Print Network [OSTI]

Application for a Replacement Testamur ADM18-V02/14 RECEIVED Please retain this copy as proof an institution that has amalgamated with Monash University may apply for a replacement testamur if their original the application form. Damaged: If you require a replacement testamur because your original testamur is damaged, we

Albrecht, David

322

ON THE LINEAR GROWTH OF THE SPLITANDMERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

ON THE LINEAR GROWTH OF THE SPLIT­AND­MERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT Functional estimation, split­and­merge tree, opti­ mization, maintenance models, age replacement poli­ cies Abstract We a consider a replacement policy based on age thresholds, for a multicomponent system. We want

Vázquez-Abad, Felisa J.

323

Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton  

E-Print Network [OSTI]

Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton Shan and was replaced by more fertile lithospheric mantle sometime after the Paleozoic. Moreover, lithospheric mantle crust (2700 Ma), suggesting that the original Archean lithosphere was replaced in the Proterozoic

Rudnick, Roberta L.

324

Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks  

E-Print Network [OSTI]

1 Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks Sachin the sensing coverage falls below the minimum threshold-coverage. We develop three node-replacement policies failed sensor node for replacement. Based on different performance criteria, every time a sensor node

Vokkarane, Vinod M.

325

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network  

E-Print Network [OSTI]

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network dynamically. Most existing cache strategies perform replacement independently, and they seldom consider coordinated replacement and energy saving issues in the context of a mobile ad hoc network. In this paper, we

Chan, Edward

326

STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM  

E-Print Network [OSTI]

STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-6R Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site Address: Enforcement Agency new or replacement duct systems in existing dwellings. For existing dwellings, a completely new

327

Shake them all! Rethinking Selection and Replacement in MOEA/D  

E-Print Network [OSTI]

Shake them all! Rethinking Selection and Replacement in MOEA/D Gauvain Marquet Bilel Derbel Arnaud-specific operators, and (iii) replace neighbors' solutions if the generated offspring is better. We remark is critical for an accurate explo- ration/exploitation balance. Moreover, the replacement mechanism (Step (iii

Paris-Sud XI, Université de

328

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

329

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

330

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

331

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

332

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

333

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

334

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

335

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

336

Nuclear criticality safety assessment of the proposed CFC replacement coolants  

SciTech Connect (OSTI)

The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

Jordan, W.C.; Dyer, H.R.

1993-12-01T23:59:59.000Z

337

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

338

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

339

Decontamination Technologies, Task 3, Urban Remediation and Response Project  

SciTech Connect (OSTI)

In the aftermath of a Radiological Dispersal Device (RDD, also known as a dirty bomb) it will be necessary to remediate the site including building exteriors and interiors, equipment, pavement, vehicles, personal items etc. Remediation will remove or reduce radioactive contamination from the area using a combination of removing and disposing of many assets (including possible demolition of buildings), decontaminating and returning to service other assets, and fixing in place or leaving in place contamination that is deemed 'acceptable'. The later will require setting acceptable dose standards, which will require negotiation with all involved parties and a balance of risk and cost to benefit. To accomplish the first two, disposal or decontamination, a combination of technologies will be deployed that can be loosely classified as: Decontamination; Equipment removal and size reduction; and Demolition. This report will deal only with the decontamination technologies that will be used to return assets to service or to reduce waste disposal. It will not discuss demolition, size reduction or removal technologies or equipment (e.g., backhoe mounted rams, rock splitter, paving breakers and chipping hammers, etc.). As defined by the DOE (1994), decontamination is removal of radiological contamination from the surfaces of facilities and equipment. Expertise in this field comes primarily from the operation and decommissioning of DOE and commercial nuclear facilities as well as a small amount of ongoing research and development closely related to RDD decontamination. Information related to decontamination of fields, buildings, and public spaces resulting from the Goiania and Chernobyl incidents were also reviewed and provide some meaningful insight into decontamination at major urban areas. In order to proceed with decontamination, the item being processed needs to have an intrinsic value that exceeds the cost of the cleaning and justifies the exposure of any workers during the decontamination process(es). In the case of an entire building, the value may be obvious; it's costly to replace the structure. For a smaller item such as a vehicle or painting, the cost versus benefit of decontamination needs to be evaluated. This will be determined on a case by case basis and again is beyond the scope of this report, although some thoughts on decontamination of unique, personal and high value items are given. But, this is clearly an area that starting discussions and negotiations early on will greatly benefit both the economics and timeliness of the clean up. In addition, high value assets might benefit from pre-event protection such as protective coatings or HEPA filtered rooms to prevent contaminated outside air from entering the room (e.g., an art museum).

Heiser,J.; Sullivan, T.

2009-06-30T23:59:59.000Z

340

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF  

SciTech Connect (OSTI)

The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

Krementz, D.; Coughlin, Jeffrey

2009-05-05T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device for a device that has been lost or stolen. Use and  

E-Print Network [OSTI]

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device as those explained in the original Fuel Device Application and for your convenience provided on this form Information Lost Stolen Unknown Date of last known use Certification of Use I certify that fuel access device

Kirschner, Denise

342

Economic and Financial Costs of Saving Water and Energy: Preliminary Analysis for Hidalgo County Irrigation District No. 2 (San Juan) – Replacement of Pipeline Units I-7A, I-18, and I-22  

E-Print Network [OSTI]

for Hidalgo County Irrigation District No. 2 (San Juan) – Replacement of Pipeline Units I-7A, I-18, and I-22 Introduction This report documents the analysis conducted for a project anticipated to be proposed to the Border Environmental Cooperative Commission...). Installation Periods: It is anticipated that it will take one year after purchase and project initiation for each of the three new pipeline segments to be installed and fully implemented (Table 4). No loss of operations or otherwise adverse impacts...

Sturdivant, Allen W.; Rister, M. Edward; Lacewell, Ronald D.

343

Experimental Results on Statistical Approaches to Page Replacement Policies  

SciTech Connect (OSTI)

This paper investigates the questions of what statistical information about a memory request sequence is useful to have in making page replacement decisions: Our starting point is the Markov Request Model for page request sequences. Although the utility of modeling page request sequences by the Markov model has been recently put into doubt, we find that two previously suggested algorithms (Maximum Hitting Time and Dominating Distribution) which are based on the Markov model work well on the trace data used in this study. Interestingly, both of these algorithms perform equally well despite the fact that the theoretical results for these two algorithms differ dramatically. We then develop succinct characteristics of memory access patterns in an attempt to approximate the simpler of the two algorithms. Finally, we investigate how to collect these characteristics in an online manner in order to have a purely online algorithm.

LEUNG,VITUS J.; IRANI,SANDY

2000-12-08T23:59:59.000Z

344

Chlorinated solvent replacements recycle/recovery review report  

SciTech Connect (OSTI)

This report is a literature review of waste solvents recycle/recovery methods and shows the results of solvent separations using membrane and distillation technologies. The experimental solvent recovery methods were conducted on solvent replacements for chlorinated solvents at Montana State University. The literature review covers waste solvents separation using distillation, membranes decantation, filtration, carbon adsorption, solvent extraction, and other vapor-phase separation techniques. The results of this study identify solvent distillation methods as the most common separation technique. The alternative separation methods typically supplement distillation. The study shows the need for industries to identify waste solvent disposal methods and investigate the economics of waste solvent recycling as a possible waste reduction method.

Beal, M.; Hsu, D.; McAtee, R.E.; Weidner, J.R. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Berg, L.; McCandless, F.P.; Waltari, S.; Peterson, C. [Montana State Univ., Bozeman, MT (United States). Dept. of Chemical Engineering

1992-08-01T23:59:59.000Z

345

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

346

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

347

Replace Report 02-771 October 29, 2002  

E-Print Network [OSTI]

. Offshore Wind Farm. Horns Rev Annual Status Report for the Environmental Monitoring Programme 1st January.................................................................................................................3 1.1 Description of the Wind Farm Project at Horns Rev ........................................3 1 .............................................................................................6 1.3 Cables in the Wind Farm and to the Shore

348

Selecting renal replacement therapies: what do African American and non-African American patients and their families think others should know? A mixed methods study  

E-Print Network [OSTI]

making about renal replacement therapies. Qual Health ResOpen Access Selecting renal replacement therapies: what doneed to inform renal replacement therapy (RRT) decisions.

2013-01-01T23:59:59.000Z

349

Fairbanks Geothermal Energy Project Final Report  

SciTech Connect (OSTI)

The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

Karl, Bernie [CHSR,LLC Owner] [CHSR,LLC Owner

2013-05-31T23:59:59.000Z

350

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

351

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

352

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

353

Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis  

SciTech Connect (OSTI)

Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

Ammar, Thoraya [King's College Hospital, Department of Radiology (United Kingdom); Rio, Alan [King's College Hospital, Department of Dietetics (United Kingdom); Ampong, Mary Ann [King's College Hospital, Department of Neurosciences (United Kingdom); Sidhu, Paul S., E-mail: paulsidhu@nhs.ne [King's College Hospital, Department of Radiology (United Kingdom)

2010-06-15T23:59:59.000Z

354

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D ...

355

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

356

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

357

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

358

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

359

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

360

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be… (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

362

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

363

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

364

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

365

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

366

E-Print Network 3.0 - ankle replacement star Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

star Search Powered by Explorit Topic List Advanced Search Sample search results for: ankle replacement star Page: << < 1 2 3 4 5 > >> 1 BOSTON UNIVERSITY COLLEGE OF ENGINEERING...

367

E-Print Network 3.0 - arthroplasty replacement knee Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The BioMotion Foundation P... - eration in osteoarthritic knees and damage of polyethylene knee prostheses after total knee replacement... , before and after total knee ......

368

Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)  

SciTech Connect (OSTI)

This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

McBride, K.C.; Russell, V.K.

1994-10-04T23:59:59.000Z

369

Microsoft Word - CX-PascoDistrictPoleReplacement_FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access...

370

Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB...  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor...

371

Microsoft Word - CX-Redmond-PilotButte-Lapine_RelayCommunicationReplac...  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Jim Riehl Electrical Engineer - TECC-CSB-2 Proposed Action: Replace a relaytransfer trip rack at...

372

Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB...  

Broader source: Energy.gov (indexed) [DOE]

2, 2013 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

373

Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement...  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

374

E-Print Network 3.0 - australian replacement research Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

consumption be replaced by a zero... and Timetables of the Proposed Australian Emissions Trading Scheme Roger A. Pielke, Jr. Center for Science... and Technology Policy...

375

E-Print Network 3.0 - australian replacement research reactor...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

consumption be replaced by a zero... and Timetables of the Proposed Australian Emissions Trading Scheme Roger A. Pielke, Jr. Center for Science... and Technology Policy...

376

Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

377

PROJECTS IMPLEMENTED The City focused on improving the efficiency of  

E-Print Network [OSTI]

· Replacing incandescent exit signs with new light emitting diode signs · Replacing the existing chiller

378

New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report  

SciTech Connect (OSTI)

Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

Kinney, L.F.; Lewis, G. [Synertech Systems Corp., Syracuse, NY (United States); Pratt, R.G.; Miller, J. [Pacific Northwest National Lab., Richland, WA (United States)

1997-08-01T23:59:59.000Z

379

Ultracomputer Research Project  

SciTech Connect (OSTI)

This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

Gottlieb, A.

1992-10-01T23:59:59.000Z

380

Acceptance test procedure for SY Tank Farm replacement exhauster unit  

SciTech Connect (OSTI)

The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

Becken, G.W.

1994-12-16T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Window Replacement, Rehabilitation, & Repair Guides - Building America Top  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of EnergyofProject isNovember 07, 2007What Isand SupplyEnergy Wind

382

Evaluation of Project Achievements in VOMARE -project.  

E-Print Network [OSTI]

??The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation… (more)

Kokkarinen, Eeva

2011-01-01T23:59:59.000Z

383

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

384

Natural Gas Procurement Challenges for a Project Financed Cogeneration Facility  

E-Print Network [OSTI]

these criteria as inconsistent with UCC project economics and normal procurement practice. A. TERM OF CONTRACT The trend in the industry was strongly moving away from long term fixed price contracts. Natural Gas prices had moved steadily upward through..., by 1986? the problem of long term take or pay contracts in the Industry was overwhelming. Most producers had written some contracts at very low prices that had not expired while consumers were replacing contract written at high prices. However...

Good, R. L.; Calvert, T. B.; Pavlish, B. A.

385

Breeding nuclear fuels with accelerators: replacement for breeder reactors  

SciTech Connect (OSTI)

One application of high energy particle accelerators has been, and still is, the production of nuclear fuel for the nuclear energy industry; tantalizing because it would create a whole new industry. This approach to producing fissile from fertile material was first considered in the early 1950's in the context of the nuclear weapons program. A considerable development effort was expended before discovery of uranium ore in New Mexico put an end to the project. Later, US commitment to the Liquid Metal Fast Breeder Reactors (LMFBR) killed any further interest in pursuing accelerator breeder technology. Interest in the application of accelerators to breed nuclear fuels, and possibly burn nuclear wastes, revived in the late 1970's, when the LMFBR came under attack during the Carter administration. This period gave the opportunity to revisit the concept in view of the present state of the technology. This evaluation and the extensive calculational modeling of target designs that have been carried out are promising. In fact, a nuclear fuel cycle of Light Water Reactors and Accelerator Breeders is competitive to that of the LMFBR. At this time, however, the relative abundance of uranium reserves vs electricity demand and projected growth rate render this study purely academic. It will be for the next generation of accelerator builders to demonstate the competitiveness of this technology versus that of other nuclear fuel cycles, such as LMFBR's or Fusion Hybrid systems. 22 references, 1 figure, 5 tables.

Grand, P.; Takahashi, H.

1984-01-01T23:59:59.000Z

386

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc Complete Policy Title: Duplicate and Replacement Parchments, Diplomas and Certificates Procedures Policy Number (if applicable): Approved by: Senate Date of Most Recent Approval: March 14, 2007

Haykin, Simon

387

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

388

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

389

A Polynomial-Time Nuclear Vector Replacement Algorithm for Automated NMR Resonance Assignments  

E-Print Network [OSTI]

A Polynomial-Time Nuclear Vector Replacement Algorithm for Automated NMR Resonance Assignments and refinement. A new algorithm, called Nuclear Vector Replacement (NVR) is introduced to compute assignments be acquired in a fraction of the time needed to record the traditional suite of ex- periments used to perform

Lilien, Ryan

390

Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa  

E-Print Network [OSTI]

Energy Policy 29 (2001) 1133­1143 Ethanol as a lead replacement: phasing out leaded gasoline cost of lead additives and of gasoline, and the falling cost of ethanol and sugarcane, have created sugarcane is produced in Africa to replace all the lead used in African gasoline; this would require Africa

Thomas, Valerie

391

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4  

E-Print Network [OSTI]

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES Person ID: 3. Business Mailing Address: [ ] Permanent or [ ] Temporary 4. Date of Birth or Date

392

Mercury Thermometer Replacement Alternatives Thermometer Description Non-Mercury Non-Mercury Non-Mercury  

E-Print Network [OSTI]

Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non-Mercury Non-Mercury Range / Division VWR-Enviro-Safe® Fisherbrand® Brooklyn Thermometer Company Inc. Total/A #12;Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non

393

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

394

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

395

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

396

Project Description: page 1 Project Description  

E-Print Network [OSTI]

Project Description: page 1 Project Description I. Introduction: Josephson junction networks Over the past 25 years, superconducting Josephson junctions have gradually become one of the major topics standards. Our research uses Josephson junctions as model systems for problems in nonlinear and neural

Segall, Ken

397

Livingston Campus Geothermal Project The Project  

E-Print Network [OSTI]

Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

Delgado, Mauricio

398

Quality assurance program plan for cesium legacy project  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

399

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites  

SciTech Connect (OSTI)

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.

2012-10-31T23:59:59.000Z

400

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Contract/Project Management  

Energy Savers [EERE]

on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

402

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

403

The 4-H Project  

E-Print Network [OSTI]

As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

404

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

405

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

406

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

407

Page 1 of 26 INDEPENDENT PROJECT  

E-Print Network [OSTI]

Page 1 of 26 INDEPENDENT PROJECT EVALUATION PROJECT NAME: HIVE PROOF-OF- CONCEPT PROJECT PROJECT ............................................................................................................................................3 The Project..............................................................................................................................................3 Project Objectives and Achievements

Evans, Paul

408

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

409

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

410

WIPP Projects Interative Map  

Broader source: Energy.gov [DOE]

View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

411

GHPsRUS Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

412

GHPsRUS Project  

SciTech Connect (OSTI)

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

413

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

: BEVATRON Bldg. #: 51 Affected Area: Lot I (6) Lower Lot (52) Dates: 6/2009 - 11/2011 Project: Seismic PhaseProject: BELLA Bldg. #: 71 Affected Area: Lot M-1(12) B81 (18) Dates: 10/2010 ­ 10/2011 Project II Bldg. #: 74 Affected Area: U1 (50) U3 (21) Dates: 10/2009 ­ 4/2012 Project: Old Town Demo Bldg

414

Fundamental Aeronautics Hypersonics Project  

E-Print Network [OSTI]

Fundamental Aeronautics Hypersonics Project Reference Document Principal Investigator: James and detailed content of a comprehensive Fundamental Aeronautics Hypersonics research project. It contains) Hypersonic Project is based on the fact that all access to earth or planetary orbit, and all entry into earth

415

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

416

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

417

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

418

New Project Opportunities  

E-Print Network [OSTI]

/year. Most projects will be sponsored by between four and ten companies. The cost of participation may changeNew Project Opportunities PIMS: Porphyry Indicator Minerals The characteristics and relative, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps

Michelson, David G.

419

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

420

Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana  

SciTech Connect (OSTI)

The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

N /A

2004-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana  

E-Print Network [OSTI]

INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332... chillers. The Hospital had been monitoring the CFC issue for the past several years, and felt it was time to begin replacing its 30 year old machines. The Hospital's original plan at the time of budgeting was a one-forane replacement of chillers...

Poche', J. M.; Broussard, J. P.

1998-01-01T23:59:59.000Z

422

Agents for replacement of NAD+/NADH system in enzymatic reactions  

DOE Patents [OSTI]

Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

Fish, Richard H.; Kerr, John B.; Lo, Christine H.

2004-04-06T23:59:59.000Z

423

Product Guide Project Standard and Project Professional  

E-Print Network [OSTI]

................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

Narasayya, Vivek

424

Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)  

SciTech Connect (OSTI)

Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

1997-11-14T23:59:59.000Z

425

Project Overload in Project Based Organizations - Causes, Symptoms and Effects.  

E-Print Network [OSTI]

?? This study investigates the matter of project overload which project members have to face in project based organizations. The thesis is based on 13… (more)

Hochdorfer, Tobias

2007-01-01T23:59:59.000Z

426

Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it!  

E-Print Network [OSTI]

Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it! Item Description Price DNA Optical discount on these items.** #12;Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact

Evans, Paul G.

427

Renewable Energy Project Refinement Webinar  

Broader source: Energy.gov [DOE]

Attendees will become familiar with the three components of project refinement: project financing strategies, off-taker agreements, and vendor selection. Project refinement obstacles, particularly...

428

RENOTER Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RENOTER Project RENOTER Project Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE...

429

Transparent and Conductive Carbon Nanotube Multilayer Thin Films Suitable as an Indium Tin Oxide Replacement  

E-Print Network [OSTI]

Transparent electrodes made from metal oxides suffer from poor flexibility and durability. Highly transparent and electrically conductive thin films based on carbon nanotubes (CNTs) were assembled as a potential indium tin oxide (ITO) replacement...

Park, Yong Tae

2012-07-16T23:59:59.000Z

430

Drafty Windows: Is it Better to Insulate or Replace Them? | Department...  

Broader source: Energy.gov (indexed) [DOE]

expensive method is a simple window insulation kit, which includes a large sheet of plastic and double-sided tape; the most expensive (and most efficient) method is to replace...

431

Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis  

E-Print Network [OSTI]

In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

Phillips, J.

1998-01-01T23:59:59.000Z

432

Variation in joint fluid composition and its effect on the tribology of replacement joint articulation  

E-Print Network [OSTI]

Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

Mazzucco, Daniel Clarke, 1976-

2003-01-01T23:59:59.000Z

433

Guideline for the seismic technical evaluation of replacement items for nuclear power plants  

SciTech Connect (OSTI)

Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included.

Harris, S.P.; Cushing, R.W. (EQE International, San Francisco, CA (United States)); Johnson, H.W. (Programmatic Solutions, Smithtown, NY (United States)); Abeles, J.M. (System 1, Inc., Potomac, MD (United States))

1993-02-01T23:59:59.000Z

434

Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)  

SciTech Connect (OSTI)

Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

Not Available

2014-09-01T23:59:59.000Z

435

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

436

National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT  

E-Print Network [OSTI]

National Compact Stellarator Experiment Project Closeout Report i PROJECT CLOSEOUT REPORT NATIONAL of Science Princeton Plasma Physics Laboratory Oak Ridge National Laboratory #12;National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT NATIONAL COMPACT STELLARATOR EXPERIMENT (NCSX

Princeton Plasma Physics Laboratory

437

An Eye for an Eye: A Single Camera Gaze-Replacement Method The Blavatnik School of Computer Science  

E-Print Network [OSTI]

An Eye for an Eye: A Single Camera Gaze-Replacement Method Lior Wolf The Blavatnik School an effective so- lution to this problem that is based on replacing the eyes of the user. This replacement, when is asked to look straight at the camera. We store these frames,then track the eyes accurately in the video

Wolf, Lior

438

Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma  

E-Print Network [OSTI]

Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

Dupont, Pierre

439

Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming Ouhyoung ( )  

E-Print Network [OSTI]

Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming In this paper, we present a practical and complete system for plausible face replacement of videos. In our system, we take two videos as inputs, and aim to replace the target human subject's face with an- other

Ouhyoung, Ming

440

CAGE TRIALS USING AN ENDOGENOUS MEIOTIC DRIVE GENE IN THE MOSQUITO AEDES AEGYPTI TO PROMOTE POPULATION REPLACEMENT  

E-Print Network [OSTI]

POPULATION REPLACEMENT SUNG-JAE CHA, AKIO MORI, DAVE D. CHADEE, AND DAVID W. SEVERSON* Center for Tropical, West Indies Abstract. Control of arthropod-borne diseases based on population replacement into natural populations. Endogenous meiotic drive systems have strong and stable population replacement

Severson, David

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

IEEE/ACM TRANSACTIONS ON NETWORKING, VOL. 10, NO. 4, AUGUST 2002 441 Efficient Randomized Web-Cache Replacement  

E-Print Network [OSTI]

-Cache Replacement Schemes Using Samples From Past Eviction Times Konstantinos Psounis, Student Member, IEEE, and Balaji Prabhakar, Member, IEEE Abstract--The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least

442

0-7803-7016-3/01/$10.00 2001 IEEE A Randomized Web-Cache Replacement Scheme  

E-Print Network [OSTI]

0-7803-7016-3/01/$10.00 ©2001 IEEE A Randomized Web-Cache Replacement Scheme Konstantinos Psounis@isl.stanford.edu Abstract-- The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least recently used document" performs poorly

Prabhakar, Balaji

443

Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring  

E-Print Network [OSTI]

1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi-Markov process, threshold replacement policy, sensitivity analysis SUMMARY This paper deals with the optimal

Ryan, Sarah M.

444

Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P. Kharoufeh2 Lisa M. Maillart3  

E-Print Network [OSTI]

Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P a stochastically degrading system using preventive and reactive replacements. The system's rate of degradation expected discounted cost of preventively and reactively replacing such a system over an infinite planning

Kharoufeh, Jeffrey P.

445

Improving Replacement Decisions in SetAssociative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg  

E-Print Network [OSTI]

Improving Replacement Decisions in Set­Associative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg Computer Science Department, University of Massachusetts, Amherst ABSTRACT Cache replacement policies play a key role in determining hit rates in set­associative caches. Cache replacement algorithms

Massachusetts at Amherst, University of

446

UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond)  

E-Print Network [OSTI]

UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond) STUDENT'S NAME STUDENT'S COLLEGE STUDENT'S UIN Under the Grade Replacement Policy for a repeated course, I request permission to replace the grade in the course listed below. I

Frank, Thomas D.

447

A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events  

E-Print Network [OSTI]

A periodic inspection and replacement policy for systems subject to competing failure modes due-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time- based block replacement policy. Numerical results show that it is indeed useful to follow closely

Paris-Sud XI, Université de

448

Fuel Cell Forklift Project Final Report  

SciTech Connect (OSTI)

This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

Cummings, Clifton C

2013-10-23T23:59:59.000Z

449

Wabash River Coal Gasification Repowering Project: A DOE Assessment  

SciTech Connect (OSTI)

The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of $438 million.

National Energy Technology Laboratory

2002-01-15T23:59:59.000Z

450

Alternatives to diesel fuel in California - fuel cycle energy and emission effects of possible replacements due to the TAC diesel particulate decision.  

SciTech Connect (OSTI)

Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible mid-course strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression-ignition by spark-ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21% above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7% above projected (total) consumption level. In the second case, compression-ignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case the authors estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOX emissions, though all scenarios bring about PM{sub 10} reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

Saricks, C. L.; Rote, D. M.; Stodolsky, F.; Eberhardt, J. J.

1999-12-03T23:59:59.000Z

451

Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision  

SciTech Connect (OSTI)

Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

2000-05-01T23:59:59.000Z

452

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

453

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

454

Battleground Energy Recovery Project  

SciTech Connect (OSTI)

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ď?· Create a Showcase Waste Heat Recovery Demonstration Project.

Daniel Bullock

2011-12-31T23:59:59.000Z

455

Advanced Blade Manufacturing Project - Final Report  

SciTech Connect (OSTI)

The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

POORE, ROBERT Z.

1999-08-01T23:59:59.000Z

456

Operational Waste Volume Projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

457

Operational waste volume projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

Koreski, G.M.

1996-09-20T23:59:59.000Z

458

Investor Confidence Project  

E-Print Network [OSTI]

projects (under $1MM), Lighter engineering requirements – V1 Released September 2013 • Targeted Commercial – Single Measure or Non-Interactive Retrofits – Release Date Dec 2013 • Multifamily – Release Q1 2014 • Quality Assurance Protocol – Currently in BETA...Environmental Defense Fund’s Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project...

Golden, M.

2013-01-01T23:59:59.000Z

459

Project Finance Case Studies  

Broader source: Energy.gov [DOE]

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

460

Prison Solar Project  

Broader source: Energy.gov [DOE]

Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

462

Barstow Wind Turbine Project  

Broader source: Energy.gov [DOE]

Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

463

TThe {\\sc Majorana} Project  

E-Print Network [OSTI]

The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

The MAJORANA collaboration

2009-10-23T23:59:59.000Z

464

Dispersion Modeling Project  

Broader source: Energy.gov (indexed) [DOE]

Dispersion Modeling Project Nuclear & Criticality Safety Engineering Andrew Vincent Germantown, MD DOE Workshop Savannah River Nuclear Solutions, LLC June, 2012 SRNS-...

465

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Greater Seattle and Olympia Metropolitan Areas Vehicle enrollment numbers refer to the EV Project only. Numbers do not reflect total regional or national vehicles sales or...

466

Our Project Regional, community,  

E-Print Network [OSTI]

City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

Minnesota, University of

467

2015 Technology Innovation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

468

The MAJORANA project  

SciTech Connect (OSTI)

The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

Elliott, Steven R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

469

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

470

NAESB BPS ATC Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By Phone * 10114 NAESB BPS ATC Project Kick Off * 107 - 10814 NAESB BPS - MISO (Carmel, IN) * 112515 - NAESB BPS Conference Call * 12215 - NAESB BPS Conference...

471

PROJECT PLANNING TEMPLATE  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on public affairs efforts, which includes public information activities, press and media services, DOE home-page content, speaking engagements, special projects, internal...

472

Gravity Train Project  

E-Print Network [OSTI]

Dec 7, 2013 ... Gravity Train Project. Same page in Romanian, Polish, and in French. Let us drill a straight tunnel from West Lafayette, IN to Paris, France:.

473

Mascoma: Frontier Biorefinery Project  

Broader source: Energy.gov [DOE]

This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

474

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

475

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project. The Master of Science in Enterprise Project Management (MS-EPM) is a 36-credit degree that goes beyond

Yang, Eui-Hyeok

476

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

477

IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993  

SciTech Connect (OSTI)

Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

NONE

1993-10-01T23:59:59.000Z

478

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

479

The Home Microbiome Project  

SciTech Connect (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-08-25T23:59:59.000Z

480

The Home Microbiome Project  

ScienceCinema (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "breaker replacement project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

482

Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011  

SciTech Connect (OSTI)

Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

2012-07-01T23:59:59.000Z

483

PSNH's Northern Wood power project repowers coal-fired plant with new fluidized-bed combustor  

SciTech Connect (OSTI)

The Northern Wood Power project permanently replaced a 50-MW coal-burning boiler (Unit 5) at Public Service of New Hampshire's Schiller station with a state-of-the-art circulating fluidized bed wood-burning boiler of the same capacity. The project, completed in December 2006, reduced emissions and expanded the local market for low-grade wood. For planning and executing the multiyear, $75 million project at no cost to its ratepayers, PSNH wins Power's 2007 Marmaduke Award for excellence in O & M. The award is named for Marmaduke Surfaceblow, the fictional marine engineer/plant troubleshoot par excellence. 7 figs., 1 tab.

Peltier, R.

2007-08-15T23:59:59.000Z

484

BC-MM-792%20NEPA,%20Replace%20BC%2016%20inch%20B-Spec%20Crude...  

Broader source: Energy.gov (indexed) [DOE]

792 Title: Replace BC 16" B-Spec Crude Oil Header Piping Description: Subcontractor shall furnish all labor, tools, materials, equipment, and supervision required to replace the...

485

Fast Charging Electric Vehicle Research & Development Project  

SciTech Connect (OSTI)

The research and development project supported the engineering, design and implementation of onroad Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: ? Short Commute: Defined as EVs performing in limited duration, routine commutes. ? Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. ? Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehiclerelated greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment A) are intended to assist future implementation of electric vehicle technology. They are based on the cited research and on the empirical data collected and presented. The report is not expected to represent the entire operating conditions of any of the equipment under consideration within this project, and tested equipment may operate differently under other conditions.

Heny, Michael

2014-03-31T23:59:59.000Z

486

Monitoring and evaluation of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached houses in Austin, Texas  

SciTech Connect (OSTI)

The US DOE initiated this project to evaluate the performance of an air conditioner retrofit program in Austin, Texas. The City's Austin's Resource Management Department pursued this project to quantify the retrofit effect of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached homes. If successfully implemented, this retrofit program could help defer construction of a new power plant which is a major goal of this department. The project compares data collected from 12 houses during two cooling seasons under pre-retrofit and then post-retrofit air conditioner units. The existing low-efficiency air conditioners were monitored during the 1987 cooling season, replaced during the 1987--88 heating season with new, smaller sized, high-efficiency units, and then monitored again during the 1988 cooling season. Results indicated that the air conditioner retrofits reduce the annual air conditioner electric consumption and peak electric demand by an average of 38%. When normalized to the nominal capacity of the air conditioner, average demand savings were 1.12 W/ft{sup 2} and estimated annual energy savings were 1.419 kWh/ft{sup 2}. Individual air conditioner power requirements were found to be a well defined function of outdoor temperature as expected. In the absence of detailed data, estimates of the peak demand reductions of new air conditioners can be made from the manufacturer's specifications. Air conditioner energy consumption proved to be strongly linear as a function of the outdoor temperature as expected when taken as an aggregate. No noticeable differences in the diversity factor of the air conditioner usage were found. Analysis of the retrofit effect using PRISM yields estimates of the reduction in normalized annual consumption (NAC) and annual cooling consumption of 12% and 30%. 2 refs., 11 figs., 17 tabs.

Burns, R.; Hough, R.E. (Fleming (W.S.) and Associates, Inc., Syracuse, NY (United States))

1991-10-01T23:59:59.000Z

487

Measuring Project Quality Factors Critical to Project Success  

E-Print Network [OSTI]

Measuring Project Quality ­ Factors Critical to Project Success Presented by Thomas Howe P available to measure and track project cost (cheap) and schedule (fast), the measurement and monitoring of project quality (good) is at best underdeveloped. While qualitative measures of project cost and schedule

Calgary, University of

488

Energy Efficiency Project Development  

SciTech Connect (OSTI)

The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

IUEP

2004-03-01T23:59:59.000Z

489

The human genome project  

SciTech Connect (OSTI)

The Human Genome Project will obtain high-resolution genetic and physical maps of each human chromosome and, somewhat later, of the complete nucleotide sequence of the deoxyribonucleic acid (DNA) in a human cell. The talk will begin with an extended introduction to explain the Project to nonbiologists and to show that map construction and sequence determination require extensive computation in order to determine the correct order of the mapped entities and to provide estimates of uncertainty. Computational analysis of the sequence data will become an increasingly important part of the project, and some computational challenges are described. 5 refs.

Bell, G.I.

1991-06-01T23:59:59.000Z

490

Projects | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergyProjectProjects Projects All 1703

491

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project  

E-Print Network [OSTI]

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project depending upon the scope, complexity, and specific features. Time periods indicated will vary depending on the nature of the project and needs of the user group

Mather, Patrick T.

492

July 28, 2013 Project Identification  

E-Print Network [OSTI]

://ernd.mosti.gov.my/eScience/Appli/frmApp_App_ProjId... 2 of 2 28/07/2013 14:10 #12;July 28, 2013 Project to expense codes).Only direct project expenses are funded by ScienceFund. Expense Category Year 1 (2010) YearJuly 28, 2013 Project Identification Project Identification Project Objectives Research Background

Bargiela, Andrzej

493

July 28, 2013 Project Identification  

E-Print Network [OSTI]

.gov.my/eScience/Appli/frmApp_App_ProjId... 1 of 1 28/07/2013 14:12 #12;July 28, 2013 Project Cost project expenses are funded by ScienceFund. Expense Category Year 1 (2008) Year 2 (2009) Year 3 (2010July 28, 2013 Project Identification Project Identification Project Objectives Research Background

Bargiela, Andrzej

494

Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011  

SciTech Connect (OSTI)

DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

2012-01-01T23:59:59.000Z

495

Contract/Project Management  

Office of Environmental Management (EM)

Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and...

496

Contract/Project Management  

Energy Savers [EERE]

Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

497

Contract/Project Management  

Energy Savers [EERE]

in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

498

Contract/Project Management  

Energy Savers [EERE]

76% This is a 3-year rolling average Data includes FY06 to FY08. (3748) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

499

Offshore Wind Project Map  

Broader source: Energy.gov [DOE]

Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

500

IT Project Manager  

Broader source: Energy.gov [DOE]

This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...