Powered by Deep Web Technologies
Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Alameda Creek Alliance P.O. Box 2626 Niles, CA 94536 (510) 499-9185  

E-Print Network [OSTI]

Alameda Creek Alliance P.O. Box 2626 · Niles, CA · 94536 · (510) 499-9185 e-mail: alamedacreek@hotmail.com web site: www.alamedacreek.org Alameda Creek Alliance Annual Membership Dinner Presentation Alliance. Join the Alameda Creek Alliance for a presentation by Robin Grossinger of the San Francisco

2

A Conceptual Restoration Plan and Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County, California  

E-Print Network [OSTI]

EDAW 2007. Potrero Hills Landfill FEIR Volume 1. Solanothe headwaters at Potrero Hills Landfill is the headwatersBranch Creek, Potrero Hills Landfill and a private rancher

Olson, Jessica J.

2012-01-01T23:59:59.000Z

3

Microsoft Word - CX-SwanValley-Goshen_GraniteCreekBoxCulvert_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Joe Johnson Natural Resource Specialist - TFBV-Kalispell Proposed Action: Replace existing bridge with a concrete box culvert at Granite Creek along Bonneville Power Administration's (BPA) Swan Valley-Goshen 161-kV transmission line. Budget Information: Work Order # 189268-01 PP&A Project No.: PP&A 2047 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities for structures, rights-of-way, and infrastructures, (such as roads), that are required to maintain infrastructures in a condition suitable for a facility to be used for its designated purpose. Location: The proposed project is located on Granite Creek along BPA's Swan Valley-Goshen

4

RADIONUCLIDE INVENTORY AND DISTRIBUTION: FOURMILE BRANCH, PEN BRANCH, AND STEEL CREEK IOUS  

SciTech Connect (OSTI)

As a condition to the Department of Energy (DOE) Low Level Waste Disposal Federal Facility Review Group (LFRG) review team approving the Savannah River Site (SRS) Composite Analysis (CA), SRS agreed to follow up on a secondary issue, which consisted of the consolidation of several observations that the team concluded, when evaluated collectively, could potentially impact the integration of the CA results. This report addresses secondary issue observations 4 and 21, which identify the need to improve the CA sensitivity and uncertainty analysis specifically by improving the CA inventory and the estimate of its uncertainty. The purpose of the work described herein was to be responsive to these secondary issue observations by re-examining the radionuclide inventories of the Integrator Operable Units (IOUs), as documented in ERD 2001 and Hiergesell, et. al. 2008. The LFRG concern has been partially addressed already for the Lower Three Runs (LTR) IOU (Hiergesell and Phifer, 2012). The work described in this investigation is a continuation of the effort to address the LFRG concerns by re-examining the radionuclide inventories associated with Fourmile Branch (FMB) IOU, Pen Branch (PB) IOU and Steel Creek (SC) IOU. The overall approach to computing radionuclide inventories for each of the IOUs involved the following components: Defining contaminated reaches of sediments along the IOU waterways Identifying separate segments within each IOU waterway to evaluate individually Computing the volume and mass of contaminated soil associated with each segment, or compartment Obtaining the available and appropriate Sediment and Sediment/Soil analytical results associated with each IOU Standardizing all radionuclide activity by decay-correcting all sample analytical results from sample date to the current point in time, Computing representative concentrations for all radionuclides associated with each compartment in each of the IOUs Computing the radionuclide inventory of each DOE-added radionuclide for the compartments of each IOU by applying the representative, central value concentration to the mass of contaminated soil Totaling the inventory for all compartments associated with each of the IOUs Using this approach the 2013 radionuclide inventories for each sub-compartment associated with each of the three IOUs were computed, by radionuclide. The inventories from all IOU compartments were then rolled-up into a total inventory for each IOU. To put the computed estimate of radionuclide activities within FMB, PB, and SC IOUs into context, attention was drawn to Cs-137, which was the radionuclide with the largest contributor to the calculated dose to a member of the public at the perimeter of SRS within the 2010 SRS CA (SRNL 2010). The total Cs-137 activity in each of the IOUs was calculated to be 9.13, 1.5, and 17.4 Ci for FMB, PB, and SC IOUs, respectively. Another objective of this investigation was to address the degree of uncertainty associated with the estimated residual radionuclide activity that is calculated for the FMB, PB, and SC IOUs. Two primary contributing factors to overall uncertainty of inventory estimates were identified and evaluated. The first related to the computation of the mass of contaminated material in a particular IOU compartment and the second to the uncertainty associated with analytical counting errors. The error ranges for the mass of contaminated material in each IOU compartment were all calculated to be approximately +/- 9.6%, or a nominal +/-10%. This nominal value was added to the uncertainty associated with the analytical counting errors that were associated with each radionuclide, individually. This total uncertainty was then used to calculate a maximum and minimum estimated radionuclide inventories for each IOU.

Hiergesell, R.; Phifer, M.

2014-04-29T23:59:59.000Z

5

Salt Creek Scenario  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scenario Scenario HELP Index Summary Scenario References Student Pages Two branches of Salt Creek run through the city of Rolling Meadows, Illinois, not far from our school. Five members of our team of eighth grade teachers from different subject areas (science, language arts, bilingual education and special education), decided to develop an interdisciplinary study of Salt Creek as a way of giving our students authentic experiences in environmental studies. The unit begins when students enter school in August, running through the third week of September, and resuming for three weeks in October. Extension activities based on using the data gathered at the creek continue throughout the school year, culminating in a presentation at a city council meeting in the spring.

6

Steel Creek fish, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991  

SciTech Connect (OSTI)

The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal plain in west-central South Carolina. The Savannah River forms the western boundary of the site. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. All but Upper Three Runs Creek receive, or in the past received, thermal effluents from nuclear production reactors. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor, and protect the lower reaches from thermal impacts. The lake has an average width of approximately 600 m and extends along the Steel Creek valley approximately 7000 m from the dam to the headwaters. Water level is maintained at a normal pool elevation of 58 m above mean sea level by overflow into a vertical intake tower that has multilevel discharge gates. The intake tower is connected to a horizontal conduit that passes through the dam and releases water into Steel Creek. The Steel Creek Biological Monitoring Program was designed to meet environmental regulatory requirements associated with the restart of L-Reactor and complements the Biological Monitoring Program for L Lake. This extensive program was implemented to address portions of Section 316(a) of the Clean Water Act. The Department of Energy (DOE) must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems.

Sayers, R.E. Jr.; Mealing, H.G. III [Normandeau Associates, Inc., New Ellenton, SC (United States)

1992-04-01T23:59:59.000Z

7

Bear Creek Valley Watershed  

Broader source: Energy.gov [DOE]

This document explains the cleanup activities and any use limitations for the land surrounding the Bear Creek Valley Watershed.

8

Steel Creek primary producers: Periphyton and seston, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991  

SciTech Connect (OSTI)

The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal Plain in west-central South Carolina. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor and to protect the lower reaches from thermal impacts. The Steel Creek Biological Monitoring Program was designed to assess various components of the system and identify and changes due to the operation of L-Reactor or discharge from L Lake. An intensive ecological assessment program prior to the construction of the lake provided baseline data with which to compare data accumulated after the lake was filled and began discharging into the creek. The Department of Energy must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems. This report summarizes the results of six years` data from Steel Creek under the L-Lake/Steel Creek Monitoring Program. L Lake is discussed separately from Steel Creek in Volumes NAI-SR-138 through NAI-SR-143.

Bowers, J.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Toole, M.A.; van Duyn, Y. [Normandeau Associates Inc., New Ellenton, SC (United States)

1992-02-01T23:59:59.000Z

9

Geology of the Upper Schep Creek area, Mason County, Texas  

E-Print Network [OSTI]

of the Llano uplift in Central Texas. The location and shape of tbe area are shown in Figure l. As the nano inplies, the upper part of Schep creek, as well as ths west branch of Panther Creek, &re within the area, ACCESSIBILITY Accessibility by road... is oausod by two internittont streans that aro deeply inoised into this plateau. The west branob of Panther Creek, which is the eastern nest stress, has developed a network of very short steep lateral oanyons in the areas of resistant Iinestone outorops...

Marshall, Hollis Dale

2012-06-07T23:59:59.000Z

10

Jordan Creek Quadrangle Volcanics Ecoregion  

E-Print Network [OSTI]

Jordan Creek Quadrangle Volcanics Ecoregion 10m30m 0-3 3-6 6-20 20-40 40-65 65-110 >110 No Data Percent Slope Jordan Creek Quadrangle Volcanics Ecoregion Coastal Lowlands Ecoregion Volcanics Ecoregion VINEMAPLE GREENLEAF GLENBROOK KELLY BUTTE PITTSBURGH TOLEDO NORTH JORDAN CREEK SUNSET SPRING WARNICKE CREEK

11

Squeezer Creek.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the property to BPA. Squeezer Creek conservation easement protects fi sh habitat in Swan Valley November 2007 Once the easement has been fi nalized, which is expected by March...

12

Salt Creek Student Homepage  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Salt Creek Investigation Salt Creek Investigation</2> "Whales Dying in the Pacific Ocean" "Fish Dying in Lake Michigan" Recent headlines remind us of environmental problems near and far away. Scientists have been wondering if these problems could be due to the warmer temperatures this past spring and summer or could there be other reasons? Lack of rain and near drought conditions have forced many areas to restrict water use. We know from past history that pollution affects our drinking water and marine life. Remember what we read about Lake Erie and from reading A River Ran Wild by Lynne Cherry. There are many factors affecting the environment around us . . . even in Salt Creek which runs through our area. We may not be able to investigate the Pacific Ocean and Lake Michigan

13

Lower East Fork Poplar Creek  

Broader source: Energy.gov [DOE]

This document explains the cleanup activities and any use limitations for the land surrounding the Lower East Fork Poplar Creek.

14

Upper East Fork Poplar Creek  

Broader source: Energy.gov [DOE]

This document explains the cleanup activities and any use limitations for the land surrounding the Upper East Fork Poplar Creek.

15

Vegetation survey of PEN Branch wetlands  

SciTech Connect (OSTI)

A survey was conducted of vegetation along Pen Branch Creek at Savannah River Site (SRS) in support of K-Reactor restart. Plants were identified to species by overstory, understory, shrub, and groundcover strata. Abundance was also characterized and richness and diversity calculated. Based on woody species basal area, the Pen Branch delta was the most impacted, followed by the sections between the reactor and the delta. Species richness for shrub and groundcover strata were also lowest in the delta. No endangered plant species were found. Three upland pine areas were also sampled. In support of K Reactor restart, this report summarizes a study of the wetland vegetation along Pen Branch. Reactor effluent enters Indian Grove Branch and then flows into Pen Branch and the Pen Branch Delta.

Not Available

1991-01-01T23:59:59.000Z

16

Interdiction Branching  

E-Print Network [OSTI]

Sep 29, 2011 ... of partitioning the search space, referred to as the branching scheme. .... standard branch-and-bound both in terms of size of the enumeration tree and ...... of the fractional variable to be selected to enter at each iteration of the.

2011-09-29T23:59:59.000Z

17

Albeni Falls-Sand Creek  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Albeni-Falls-Sand-Creek- Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer Involvement...

18

Oxley Creek Common Brisbane, Australia  

E-Print Network [OSTI]

right about 100 m after the bridge over Oxley Creek. The gate is always open. Amenities The main and turn left before the bridge crossing Oxley Creek. If approaching from the west (Sherwood side) turn. Both Rainbow and Scaly-breasted Lorikeets fly over in small screeching flocks. Golden-headed Cisticola

Queensland, University of

19

REVIEW PLAN PINE CREEK LAKE  

E-Print Network [OSTI]

#12;REVIEW PLAN PINE CREEK LAKE McCurtain County, Oklahoma DAM SAFETY MODIFICATION STUDY TULSA LEFT BLANK #12;REVIEW PLAN Pine Creek Lake, Oklahoma Dam Safety Modification Study TABLE OF CONTENTS and Costs 17 13. Public Participation 19 14. Review Plan Approval and Updates 19 15. Review Plan Points

US Army Corps of Engineers

20

E-Print Network 3.0 - asotin creek watershed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Units Calwater Subbasins ---(Planning Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: ForemanCreek Manson Creek Mill Creek Malosky Creek...

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

E-Print Network 3.0 - asotin creek instream Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Units Calwater Subbasins ---(Planning Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Creek Malosky Creek Spring Creek Silver Creek San...

22

Panther Creek | Open Energy Information  

Open Energy Info (EERE)

Creek Creek Jump to: navigation, search Name Panther Creek Facility Panther Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status Under Construction Owner Affinity Wind/Suzlon Energy Limited Developer Surity Wind Location Pike County IL Coordinates 39.607275°, -90.85556° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.607275,"lon":-90.85556,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

23

Pigeon Creek | Open Energy Information  

Open Energy Info (EERE)

Pigeon Creek Pigeon Creek Jump to: navigation, search Name Pigeon Creek Facility Pigeon Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Adams Electric Cooperative Developer Adams Electric Cooperative Energy Purchaser Adams Electric Cooperative Location Near Payson IL Coordinates 39.83328984°, -91.19227409° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.83328984,"lon":-91.19227409,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

24

Lower East Fork Poplar Creek  

Broader source: Energy.gov (indexed) [DOE]

is safe for limited water-contact recreational uses, such as wading in footwear. Eating fish from the creek is not recommended based upon the level of mercury in the fish. Are...

25

Bennett Creek | Open Energy Information  

Open Energy Info (EERE)

Creek Creek Jump to: navigation, search Name Bennett Creek Facility Bennett Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Idaho Windfarms / John Deere Developer Idaho Windfarms Location Elmore County ID Coordinates 43.0466399°, -115.485481° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0466399,"lon":-115.485481,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

Meadow Creek | Open Energy Information  

Open Energy Info (EERE)

Meadow Creek Meadow Creek Jump to: navigation, search Name Meadow Creek Facility Meadow Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Ridgeline Energy Developer Ridgeline Energy Energy Purchaser PacifiCorp (Rocky Mountain Power) Location Idaho Falls ID Coordinates 43.50492362°, -111.8366146° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.50492362,"lon":-111.8366146,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

27

The Lyons Creek boat remains  

E-Print Network [OSTI]

and artifacts dating to the colonial era were discovered during a dredging operation at Lyons Creek, a tributary of the Patuxent River, Calvert County, Maryland. Also recovered from the spoil area were ceramics, wine bottles, and kaolin tobacco pipes, which... Lyons Creek A Shortage of Boats 17 Ferriage 33 Lightering Tobacco Small Craft on the Patuxent River 35 Shallops and Sloops 48 Flats 61 Other Colonial-Era Small Craft 64 III ARTIFACTS AND DATING 68 A Lack of Provenience 68 Cannonballs 69...

Neyland, Robert Stephen

1990-01-01T23:59:59.000Z

28

Big Bayou Creek and Little Bayou Creek Watershed Monitoring Program  

SciTech Connect (OSTI)

Biological monitoring of Little Bayou and Big Bayou creeks, which border the Paducah Site, has been conducted since 1987. Biological monitoring was conducted by University of Kentucky from 1987 to 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 through March 1999. In March 1998, renewed Kentucky Pollutant Discharge Elimination System (KPDES) permits were issued to the US Department of Energy (DOE) and US Enrichment Corporation. The renewed DOE permit requires that a watershed monitoring program be developed for the Paducah Site within 90 days of the effective date of the renewed permit. This plan outlines the sampling and analysis that will be conducted for the watershed monitoring program. The objectives of the watershed monitoring are to (1) determine whether discharges from the Paducah Site and the Solid Waste Management Units (SWMUs) associated with the Paducah Site are adversely affecting instream fauna, (2) assess the ecological health of Little Bayou and Big Bayou creeks, (3) assess the degree to which abatement actions ecologically benefit Big Bayou Creek and Little Bayou Creek, (4) provide guidance for remediation, (5) provide an evaluation of changes in potential human health concerns, and (6) provide data which could be used to assess the impact of inadvertent spills or fish kill. According to the cleanup will result in these watersheds [Big Bayou and Little Bayou creeks] achieving compliance with the applicable water quality criteria.

Kszos, L.A.; Peterson, M.J.; Ryon; Smith, J.G.

1999-03-01T23:59:59.000Z

29

Fermilab | Tritium at Fermilab | Ferry Creek Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(click chart for larger version) shows the levels of tritium in Ferry Creek on the Fermilab site since April 2006. To date, Fermilab has not detected tritium in Ferry Creek. The...

30

Putah Creek Terrestrial Wildlife Monitoring Program  

E-Print Network [OSTI]

;#12;#12;#12;#12;#12;#12;#12;#12;#12;MAP EXHIBITS C1-36 Avian Focal Species Distribution Maps Putah Creek and Yolo-Sutter Bypass Sites, OX=Oxbow, DC=Dry Creek Confluence, WN=Winters Putah Creek Park, YH=Yolo Housing, LB=Center for Land

Todd, Brian

31

Microsoft Word - Ninemile_Creek_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Tribes of the Colville Reservation for purchase of the Ninemile Creek property Fish and Wildlife Project No.: 2008-104-00, BPA-005670 Categorical Exclusion Applied (from...

32

Microsoft Word - CoyoteCreekNE_CX  

Broader source: Energy.gov (indexed) [DOE]

Project Manager - KEWM-4 Proposed Action: Coyote Creek Property Acquisition Funding Fish and Wildlife Project No.: 2011-003-00, Contract BPA-007521 Categorical Exclusion...

33

New Jersey Nuclear Profile - Oyster Creek  

U.S. Energy Information Administration (EIA) Indexed Site

Oyster Creek" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

34

Jordan Creek Flood Risk Management Project Springfield, Missouri  

E-Print Network [OSTI]

Jordan Creek Flood Risk Management Project Springfield, Missouri 29 May 2013 Abstract: The overall flow capacity along Jordan Creek. The area along Jordan Creek is heavily urbanized and includes

US Army Corps of Engineers

35

The Copper Creek Clovis Point from Hells Canyon, Northeastern Oregon  

E-Print Network [OSTI]

No. 1 (2008) | pp. 75-84 The Copper Creek Clovis Point fromside of the Snake River to the Copper Creek point discovery1 (2008) 5 cm Figure 4. The Copper Creek Clovis point (tick

Reid, Kenneth C.; Root, Matthew J.; Hughes, Richard E.

2008-01-01T23:59:59.000Z

36

DOE - Office of Legacy Management -- Hoe Creek Underground Coal...  

Office of Legacy Management (LM)

Hoe Creek Underground Coal Gasification Site - 045 FUSRAP Considered Sites Site: Hoe Creek Underground Coal Gasification Site (045) Designated Name: Alternate Name: Location:...

37

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers [EERE]

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

38

BOX SPLINES Hartmut Prautzsch  

E-Print Network [OSTI]

as density functions of the shadows of higher dimensional boxes and half-boxes. Of particular in- terest and their general theory is given in the book by de Boor, H¨ollig and Riemenschneider [10] who also give valuable = ui . Then, Bk(x) represents the density of the "shadow" of k, i.e., Bk(x) = 1 volkk volk-sk(x) , (1

Prautzsch, Hartmut

39

Cobb Creek Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Cobb Creek Geothermal Facility Cobb Creek Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Cobb Creek Geothermal Facility General Information Name Cobb Creek Geothermal Facility Facility Cobb Creek Sector Geothermal energy Location Information Location The Geysers, Californi Coordinates 38.804734473609°, -122.78414726257° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.804734473609,"lon":-122.78414726257,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

40

Salmon Creek Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Panther Creek, Idaho, Habitat Rehabilitation, Final Report.  

SciTech Connect (OSTI)

The purpose of the project was to achieve full chinook salmon and steelhead trout production in the Panther Creek, Idaho, basin. Plans were developed to eliminate the sources of toxic effluent entering Panther Creek. Operation of a cobalt-copper mine since the 1930's has resulted in acid, metal-bearing drainage entering the watershed from underground workings and tailings piles. The report discusses plans for eliminating and/or treating the effluent to rehabilitate the water quality of Panther Creek and allow the reestablishment of salmon and trout spawning runs. (ACR)

Reiser, Dudley W.

1986-01-01T23:59:59.000Z

42

Reintroduction of Native FishReintroduction of Native Fish Species to Coal CreekSpecies to Coal Creek  

E-Print Network [OSTI]

1 Reintroduction of Native FishReintroduction of Native Fish Species to Coal CreekSpecies to Coal Control and Reclamation ActSurface Mining Control and Reclamation Act of 1977of 1977 Coal Creek Watershed Foundation (2000)Coal Creek Watershed Foundation (2000) BackgroundBackground Fish populations in Coal Creek

Gray, Matthew

43

Elbow Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Elbow Creek Wind Farm Elbow Creek Wind Farm Jump to: navigation, search Name Elbow Creek Wind Farm Facility Elbow Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Padoma Developer Padoma Location Howard County TX Coordinates 32.133515°, -101.415676° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.133515,"lon":-101.415676,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

44

Wolverine Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wolverine Creek Wind Farm Wolverine Creek Wind Farm Jump to: navigation, search Name Wolverine Creek Wind Farm Facility Wolverine Creek Wind Energy Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser PacifiCorp Location East of ID Falls ID Coordinates 43.422203°, -111.83439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.422203,"lon":-111.83439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

45

Elm Creek II | Open Energy Information  

Open Energy Info (EERE)

Elm Creek II Elm Creek II Jump to: navigation, search Name Elm Creek II Facility Elm Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Location Jackson and Martin County MN Coordinates 43.756372°, -94.956014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.756372,"lon":-94.956014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

46

Bear Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Bear Creek Wind Farm Bear Creek Wind Farm Facility Bear Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Babcock & Brown owns majority Developer CEI Iberdrola Energy Purchaser PPL Corp. Location Near Bear Creek Village PA Coordinates 41.1801°, -75.7216° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.1801,"lon":-75.7216,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

47

Elm Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Elm Creek Wind Farm Elm Creek Wind Farm Jump to: navigation, search Name Elm Creek Wind Farm Facility Elm Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Energy Purchaser Great River Energy Location MN Coordinates 43.780285°, -94.845586° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.780285,"lon":-94.845586,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

48

Bull Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Bull Creek Wind Farm Bull Creek Wind Farm Jump to: navigation, search Name Bull Creek Wind Farm Facility Bull Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Eurus Developer Eurus Energy Purchaser Market Location Near Gail TX Coordinates 32.933099°, -101.584425° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.933099,"lon":-101.584425,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

49

Environmental geophysics at Kings Creek Disposal Site and 30th Street Landfill, Aberdeen Proving Ground, Maryland  

SciTech Connect (OSTI)

Geophysical studies on the Bush River Peninsula in the Edgewood Area of Aberdeen Proving Ground, Maryland, delineate landfill areas and provide diagnostic signatures of the hydrogeologic framework and possible contaminant pathways. These studies indicate that, during the Pleistocene Epoch, alternating stands of high and low seal levels resulted in a complex pattern of shallow channel-fill deposits in the Kings Creek area. Ground-penetrating radar studies reveal a paleochannel greater than 50 ft deep, with a thalweg trending offshore in a southwest direction into Kings Creek. Onshore, the ground-penetrating radar data indicate a 35-ft-deep branch to the main channel, trending to the north-northwest directly beneath the 30th Street Landfill. Other branches are suspected to meet the offshore paleochannel in the wetlands south and east of the 30th Street Landfill. This paleochannel depositional system is environmentally significant because it may control the shallow groundwater flow regime beneath the site. Electromagnetic surveys have delineated the pre-fill lowland area currently occupied by the 30th Street Landfill. Magnetic and conductive anomalies outline surficial and buried debris throughout the study area. On the basis of geophysical data, large-scale dumping has not occurred north of the Kings Creek Disposal Site or east of the 30th Street Landfill.

Davies, B.E.; Miller, S.F.; McGinnis, L.D.; Daudt, C.R.; Thompson, M.D.; Stefanov, J.E.; Benson, M.A.; Padar, C.A.

1995-01-01T23:59:59.000Z

50

Blasting of the Twin Creek`s highwall failure  

SciTech Connect (OSTI)

On December 26, 1994, at 1:00 a.m., the Twin Creeks Mine experienced a major highwall failure involving over 2.5 million tons. The long chain of events that led up to this failure actually started in late August when a truck driver first noticed the cracks in the highwall. Soon after, an intense survey prism monitoring program was initiated. An electronic, continuous monitor linked to Dispatch was soon in place which monitored the crack that was most likely to fail into the active pit area first. It wasn`t until early December when the graphs started showing greater increases in movement. On December 22, the acceleration curves skied-out. The 600 ft. highwall finally collapsed about three days later and left material spread 800 ft. across the bottom of the pit. Not knowing if the large overhangs above the slide would soon give away sending more material into the pit or if the numerous tension cracks on the surface would result in yet another major failure, it was only after restoring the rigid monitoring program and observing no movement that the company decided to drill and blast the overhanging material. The purpose of the blast wasn`t to cast the material into the pit, but to kick-out the toe so that the weight of material above would fall upon itself. After two months of preparation and almost three weeks of drilling and loading, the shot occurred on March 21, 1995. Approximately one million tons were successfully blasted that day, and presently they have completed mining the slough material itself and reestablished benches from the top.

Gray, C.J.; Bachmann, J.A. [Santa Fe Pacific Gold Corp., Winnemucca, NV (United States). Twin Creeks Mine

1996-12-01T23:59:59.000Z

51

TR-025 Geomorphology March 2003 Schmidt Creek Sediment Sources  

E-Print Network [OSTI]

TR-025 Geomorphology March 2003 Schmidt Creek Sediment Sources and the Johnstone Strait Killer, Thomas. 2003. Schmidt Creek Sediment Sources and the Johnstone Strait Killer Whale Rubbing Beach. Res.................................................................................................................... 2 3. Sediment Sources - Natural and Logging Related

52

Crane Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Crane Creek Wind Farm Crane Creek Wind Farm Facility Crane Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Developer EnXco Energy Purchaser Wisconsin P ublic Service Group Location Northeast of Riceville IA Coordinates 43.410108°, -92.51652° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.410108,"lon":-92.51652,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

53

Crane Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Crane Creek Geothermal Area Crane Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Crane Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.3064,"lon":-116.7447,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

54

Edwards Creek Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Edwards Creek Geothermal Project Edwards Creek Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Edwards Creek Geothermal Project Project Location Information Coordinates 39.617222222222°, -117.67166666667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.617222222222,"lon":-117.67166666667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

55

Reedy Creek Improvement Dist | Open Energy Information  

Open Energy Info (EERE)

Reedy Creek Improvement Dist Reedy Creek Improvement Dist Jump to: navigation, search Name Reedy Creek Improvement Dist Place Florida Utility Id 15776 Utility Location Yes Ownership M NERC Location FRCC NERC FRCC Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GS General Service GSD General Service Demand RS Residential Service Residential Average Rates Residential: $0.1240/kWh Commercial: $0.1130/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

56

Separation Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Separation Creek Geothermal Area Separation Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Separation Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (1) 10 References Area Overview Geothermal Area Profile Location: Oregon Exploration Region: Cascades GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

57

Cherry Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Cherry Creek Geothermal Area Cherry Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Cherry Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.85,"lon":-114.905,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

58

Willow Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Willow Creek Wind Farm Willow Creek Wind Farm Facility Willow Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Location Morrow County OR Coordinates 45.828458°, -119.795537° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.828458,"lon":-119.795537,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

59

Lava Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Lava Creek Geothermal Area Lava Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Lava Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":65.2283,"lon":-162.894,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

60

Recommendation 195: Mitigation of Contamination in Bear Creek Burial Grounds  

Broader source: Energy.gov [DOE]

The ORSSAB requests DOE provide possible remedial actions to mitigate releases of contamination from Bear Creek Burial Grounds.

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

The importance of tidal creek ecosystems Keywords: Estuary; Tidal creek; Pollution  

E-Print Network [OSTI]

systems such as the rocky intertidal of the northeast United States and eastern Canada, the open beaches rarely exceeds 3.0 m at high tide, and some tidal creeks contain broad intertidal sand or mud flats

Mallin, Michael

62

Papalote Creek II | Open Energy Information  

Open Energy Info (EERE)

Papalote Creek II Papalote Creek II Jump to: navigation, search Name Papalote Creek II Facility Papalote Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.ON Climate & Renewables North America Developer E.ON Climate & Renewables North America Energy Purchaser Lower Colorado River Authority Location 30 miles north of Corpus Christi in San Patricio County TX Coordinates 28.254569°, -97.40015° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":28.254569,"lon":-97.40015,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

Stony Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Stony Creek Wind Farm Stony Creek Wind Farm Jump to: navigation, search Name Stony Creek Wind Farm Facility Stony Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.ON Climate and Renewables Developer E.ON Climate and Renewables Location Somerset County PA Coordinates 40.039256°, -78.781979° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.039256,"lon":-78.781979,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

64

Eva Creek Wind Project | Open Energy Information  

Open Energy Info (EERE)

Eva Creek Wind Project Eva Creek Wind Project Jump to: navigation, search Name Eva Creek Wind Project Facility Eva Creek Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Golden Valley Electric Association Developer Golden Valley Electric Association Energy Purchaser Golden Valley Electric Association Location NE corner of Denali Natl Park AK Coordinates 64.0602°, -148.9054° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":64.0602,"lon":-148.9054,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

65

Lost Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Lost Creek Wind Farm Lost Creek Wind Farm Jump to: navigation, search Name Lost Creek Wind Farm Facility Lost Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wind Capital Group Developer Wind Capital Group Energy Purchaser Associated Electric Cooperative Location DeKalb County MO Coordinates 39.98080324°, -94.55009937° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.98080324,"lon":-94.55009937,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

66

Papalote Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Papalote Creek Wind Farm Papalote Creek Wind Farm Jump to: navigation, search Name Papalote Creek Wind Farm Facility Papalote Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.On Climate & Renewables Developer E.On Climate & Renewables Energy Purchaser CPS San Antonio Location San Patricio County TX Coordinates 27.925458°, -97.394686° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.925458,"lon":-97.394686,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

67

Forest Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Creek Wind Farm Creek Wind Farm Jump to: navigation, search Name Forest Creek Wind Farm Facility Forest Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.On Climate & Renewables Developer E.On Climate & Renewables/RGI Energy Purchaser Luminant Location Glasscock and Sterling Counties TX Coordinates 31.937348°, -101.312513° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.937348,"lon":-101.312513,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

68

Prairie Creek Ethanol LLC | Open Energy Information  

Open Energy Info (EERE)

Creek Ethanol LLC Creek Ethanol LLC Jump to: navigation, search Name Prairie Creek Ethanol LLC Place Goldfield, Iowa Zip 50542 Product Prairie Creek Ethanol, LLC had planned to build a 55m gallon (208m litre) per year ethanol plant in Wesley, Iowa, but, as of 23 May 2008, the board of directors voted to recommend to the members of the company to dissolve the company as soon as possible. Coordinates 37.707559°, -117.233459° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.707559,"lon":-117.233459,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

69

Impedance Measurement Box  

SciTech Connect (OSTI)

Energy storage devices, primarily batteries, are now more important to consumers, industries and the military. With increasing technical complexity and higher user expectations, there is also a demand for highly accurate state-of-health battery assessment techniques. IMB incorporates patented, proprietary, and tested capabilities using control software and hardware that can be part of an embedded monitoring system. IMB directly measures the wideband impedance spectrum in seconds during battery operation with no significant impact on service life. It also can be applied to batteries prior to installation, confirming health before entering active service, as well as during regular maintenance. For more information about this project, visit http://www.inl.gov/rd100/2011/impedance-measurement-box/

Christophersen, Jon

2011-01-01T23:59:59.000Z

70

Microsoft Word - Coyote Creek CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2013 3, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Provision of funds to acquire a conservation easement over the 310-acre Coyote Creek property. Fish and Wildlife Project No.: 2011-003-00, Contract # BPA-006468 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation and wildlife management. Location: Veneta and West Eugene quadrangles, in Lane County, Oregon (near Eugene, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA is proposing to fund The Nature Conservancy's (Conservancy) purchase of the Coyote Creek property, a 310-acre parcel of land located just west of the

71

Blue Creek Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Farm Farm Jump to: navigation, search Name Blue Creek Wind Farm Facility Blue Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Energy Purchaser First Energy Solutions Location Van Wert County OH Coordinates 41.018286°, -84.615355° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.018286,"lon":-84.615355,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

72

Microsoft Word - Soos_Creek_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

Timothy Wicks Timothy Wicks Realty Specialist - TERR-COVINGTON Proposed Action: Soos Creek Water & Sewer District Land Use Review Request Case No. 20120040 Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 - Multiple use of powerline rights-of-way Location: Covington, King County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request from Soos Creek Water & Sewer District (District) to construct a new sewer line that would cross under an existing road on BPA fee-owned property near structures 1/2 and 1/3 of the Covington-Maple Valley No. 2 230-kilovolt (kV) transmission line. The proposed sewer line

73

Trout Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Trout Creek Geothermal Area Trout Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Trout Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.18822,"lon":-118.37756,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

74

Radioiodinated branched carbohydrates  

DOE Patents [OSTI]

A radioiodinated branched carbohydrate for tissue imaging. Iodine-123 is stabilized in the compound by attaching it to a vinyl functional group that is on the carbohydrate. The compound exhibits good uptake and retention and is promising in the development of radiopharmaceuticals for brain, heart and tumor imaging.

Goodman, Mark M. (Knoxville, TN); Knapp, Jr., Furn F. (Oak Ridge, TN)

1989-01-01T23:59:59.000Z

75

The Patroon Creek Contamination Migration Investigation  

SciTech Connect (OSTI)

Shaw performed a Site Investigation (SI) for sediment within the Unnamed Tributary of the Patroon Creek, a section of the Patroon Creek, and the Three Mile Reservoir as part of the overall contract with the United States Army Corps of Engineers (USACE) to remediate the Colonie Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. The Unnamed Tributary formerly flowed through the former Patroon Lake, which was located on the main site property and was used as a landfill for radiological and chemical wastes. The objective of the investigation was to determine the absence/presence of radioactive contamination within the three Areas of Concern (AOC). In order to accomplish this objective, Shaw assembled a team to produce a Technical Memorandum that provided an in-depth understanding of the environmental conditions related to the Patroon Creek. Upon completion and analysis of the Technical Memorandum, a Conceptual Site Model (CSM) was constructed and a Technical Planning Program (TPP) was held to develop a Sediment Investigation Work Plan and Sediment Investigation Sampling and Analysis Plan. A total of 32 sample locations were analyzed using on-site direct gamma scans with a Pancake Geiger-Mueller (PGM) instrument for screening purposes and samples were analyzed at on-site and off-site laboratories. The highest interval from each core scan was selected for on-site analysis utilizing a High Purity Germanium (HPGe) detector. Eight of these samples were sent off-site for gamma/alpha spectroscopy confirmation. The data collected during the SI indicated that the U-238 cleanup criterion was exceeded in sediment samples collected from two locations within the Unnamed Tributary but not in downstream sections of Patroon Creek or Three Mile Reservoir. Future actions for impacted sediment in the Unnamed Tributary will be further evaluated. Concentrations of U-238 and Th-232 in all other off-site sediment samples collected from the Unnamed Tributary, Patroon Creek, and the Three Mile Reservoir indicate that no further action is required in these areas. The data was also compared to ecological screening criteria. None of the contaminants of concern (U-238, Th-232, and U-235) had concentrations exceeding the screening values. The evaluation indicates no adverse impacts to ecological receptors. (authors)

Dufek, K.; Zafran, A. [Shaw Environmental and Infrastructure, Colonie FUSRAP Site, 1130 Central Avenue, Colonie, New York 12205 (United States); Moore, J.T. [United States Army Corps of Engineers-New York District, 26 Federal Plaza, Room 1811, New York, NY 10278-0090 (United States)

2006-07-01T23:59:59.000Z

76

Hawaii Department of Health Clean Air Branch | Open Energy Information  

Open Energy Info (EERE)

Clean Air Branch Clean Air Branch Jump to: navigation, search Name Hawaii Department of Health Clean Air Branch Address P.O. Box 3378 Place Honolulu, Hawaii Zip 96801 Website http://hawaii.gov/health/envir Coordinates 21.31°, -157.86° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.31,"lon":-157.86,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

77

Hawaii Department of Health Clean Water Branch | Open Energy Information  

Open Energy Info (EERE)

Hawaii Department of Health Clean Water Branch Hawaii Department of Health Clean Water Branch Jump to: navigation, search Name Hawaii Department of Health Clean Water Branch Address P.O. Box 3378 Place Honolulu, Hawaii Zip 96801 Website http://hawaii.gov/health/envir Coordinates 21.31°, -157.86° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.31,"lon":-157.86,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

78

DOE - Office of Legacy Management -- Hoe Creek Underground Coal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hoe Creek Underground Coal Hoe Creek Underground Coal Gasification Site - 045 FUSRAP Considered Sites Site: Hoe Creek Underground Coal Gasification Site (045) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Hoe Creek Underground Gasification site occupies 80 acres of land located in Campbell County, Wyoming. The site was used to investigate the process and environmental parameters of underground coal gasification technologies in the 1970s. The Department of Energy¿s (DOE) current mission is limited to completing environmental remediation activities at the site. This property is owned by the Bureau of Land Management (BLM),

79

Microsoft Word - Trimble_Creek_Acquisition_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

funds to the Kalispel Tribe (Kalispel) for purchase of Trimble Creek (Doramus) Property Fish and Wildlife Project No.: 1992-061-00, Contract BPA-004991 Categorical Exclusion...

80

Field Algae Measurements Using Empirical Correlations at Deer Creek Reservoir.  

E-Print Network [OSTI]

??Deer Creek Reservoir in Utah has a history of high algae concentrations. Despite recent nutrient reduction efforts, seasonal algae continue to present problems. Cost effective, (more)

Stephens, Ryan A.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Lower Watts Bar Reservoir Clinch River/Poplar Creek  

Broader source: Energy.gov [DOE]

This document explains the cleanup activities and any use limitations for the land surrounding the Lower Watts Bar Reservoir Clinch River/Poplar Creek.

82

New Jersey Nuclear Profile - PSEG Hope Creek Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

PSEG Hope Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

83

Water column oxygen demand and sediment oxygen flux: patterns of oxygen depletion in tidal creeks  

Science Journals Connector (OSTI)

Five study sites were chosen in Futch Creek, Hewletts Creek and Pages Creek,...1). Sites were chosen to reflect a range in the values of dissolved oxygen levels, chlorophyll a concentrations and nutrient (nitroge...

Tara A. MacPherson; Lawrence B. Cahoon; Michael A. Mallin

2007-07-01T23:59:59.000Z

84

Geology of the Bee Branch-Mill Creek area, Mason County, Texas  

E-Print Network [OSTI]

that originated on the Cretaceous ctr-te in Tertiary time in Csn tral Texas, Tarr brcu?ht cut +he fact that, since the Coloraoo in Cen- tral Texas flo -s with a ?en&. ral ccm: e at ri&ht an". les tc the strike of the Carboniferous reck, in an opposite direction... tc the d1p, the Cole- racc River sel. ected its course on a structure thaw is nc longer present. He believed that this earlier . ructure wes present cn Cretaceous strata because the Paleos& ic reyi& n of Central Texas is only partially unsovered...

Miller, George Howard

1957-01-01T23:59:59.000Z

85

E-Print Network 3.0 - abernathy creek washington Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Kings Creek (7770 Acres) 35,920 Hectares 4th Field HUC 3304120102 Castlerock Falls (7371...

86

E-Print Network 3.0 - allens creek nuclear Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Units Calwater Subbasins ---(Planning Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Kings Creek (7770 Acres) 35,920 Hectares 4th Field HUC...

87

E-Print Network 3.0 - asotin creek fencing Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Kings Creek (7770 Acres) 35,920 Hectares 4th Field HUC 3304120102 Castlerock Falls (7371...

88

E-Print Network 3.0 - asotin creek model Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Units Calwater Subbasins ---(Planning Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Kings Creek (7770 Acres) 35,920 Hectares 4th Field HUC...

89

Big Canyon Creek Ecological Restoration Strategy.  

SciTech Connect (OSTI)

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

Rasmussen, Lynn; Richardson, Shannon

2007-10-01T23:59:59.000Z

90

Executive Branch Management Scorecard | Department of Energy  

Office of Environmental Management (EM)

Executive Branch Management Scorecard Executive Branch Management Scorecard More Documents & Publications Executive Branch Management Scorecard Slide 1 Three Year Rolling Timeline...

91

FEA OF THE HORSETAIL CREEK BRIDGE STRENGTHENED WITH FRP LAMINATES  

E-Print Network [OSTI]

FEA OF THE HORSETAIL CREEK BRIDGE STRENGTHENED WITH FRP LAMINATES Kasidit Chansawat, Damian I. Kachlakev, Thomas H. Miller, and Solomon C.S. Yim ABSTRACT A three-dimensional finite element (FE) model is developed to examine the structural behavior of the Horsetail Creek Bridge in Oregon both before and after

Yim, Solomon C.

92

Tons of Heavy Metals in Mill Creek Sediments Heather Freeman  

E-Print Network [OSTI]

objectives for this summer research were to: 1.) determine how much heavy metal pollution has accumulatedTons of Heavy Metals in Mill Creek Sediments Heather Freeman 8/30/99 Geology Department Advisors: Dr. Kees DeJong Dr. Barry Manyard Dr. David Nash #12;Tons of heavy metals in Mill Creek sediments

Maynard, J. Barry

93

Design of Flexible-Duct Junction Boxes  

Broader source: Energy.gov (indexed) [DOE]

Design of Flexible-duct Design of Flexible-duct Junction Boxes Robert Beach, IBACOS Duncan Prahl, IBACOS Design of Flexible-duct Junction Boxes Presentation Outline * Current Standards and Practice * Analysis Methods * Recommendations Design of Flexible-duct Junction Boxes * Detailed report is in peer review anticipated to be published T3 this year. - http://www1.eere.energy.gov/library/default.aspx?page=2&spi d=2. * Measure guide to be part of Building America Solutions Center - http://basc.pnnl.gov/ Design of Flexible-duct Junction Boxes Typical Installations As Plenum As Monster Design of Flexible-duct Junction Boxes Current Standards * ASHRAE 2012 HVAC Systems and Equipment, Box Plenum Systems Using Flexible Duct - Constrains Box Width to 2-3x Entrance Width - Constrains Box Length to 2 x Box Width

94

Lauren Garcia SU Box 1195  

E-Print Network [OSTI]

Lauren Garcia SU Box 1195 Geos 206 Renewable Energy and the Sustainable Campus Prof. Dethier a lot of fabric in dorms to cover furniture, but how durable is that fabric, how sustainable is it, but it could be applied to any building on campus that houses furniture. I am defining "green" as non

Aalberts, Daniel P.

95

NETL's JIC in a box  

ScienceCinema (OSTI)

The National Energy Technology Laboratory developed the idea of a portable joint information center AKA JIC in-a-box. This video discribes some of the equipment in the portable JIC as well as some of the methodology that NETL developed as a result of this portable JIC concept.

David Anna

2010-01-08T23:59:59.000Z

96

Wind power for the Creek Nation. Final report  

SciTech Connect (OSTI)

An Enertech 1800 horizontal-axis wind powered electric generator was purchased and interphased with the electric utility system provided to the Creek Nation by the Public Service Company of Oklahoma. Objectives of the work include: to determine the economic feasibility of wind power for the Creek Nation region; to educate the Creek Nation and other Indian tribes about the potential use of wind power; and to accumulate valuable climatic data through an on-site wind survey at a height of 60' over a long period of time. (LEW)

Not Available

1982-01-01T23:59:59.000Z

97

Eastern Box Turtle Terrapene carolina carolina  

E-Print Network [OSTI]

Eastern Box Turtle Terrapene carolina carolina * * * * * * * Adult male Eastern Box turtle. See.uga.edu/srel/outreach.htm shell). Females have brown eyes and a flat plastron. Box turtles are true omnivores, feeding the turtle to close up very tightly. This feature provides great protection from raccoons, foxes and other

Georgia, University of

98

Clear Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Geothermal Area Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Clear Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":64.85,"lon":-162.3,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

99

Smith Creek Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Smith Creek Geothermal Project Project Location Information Coordinates 39.311388888889°, -117.55083333333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.311388888889,"lon":-117.55083333333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

100

Granite Creek Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Granite Creek Geothermal Project Project Location Information Coordinates 41.058611111111°, -117.22777777778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.058611111111,"lon":-117.22777777778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

An insoluble residue study of the Cretaceous Cow Creek Limestone of Central Texas  

E-Print Network [OSTI]

Regional Stratigr chy. Local Stratigrapby 14 14 Honeycut Bend. Cyoress Creek. Hickory Creek. Cox Crossing Hamilton Pool. IB 19 2O 21 21 Rebecca Creek. PALEONTOLOGY MINERALOGY 23 25 Page Introduction 27 Constituents of the Sand... in Central Texas 17 5. Feldspar and. chert-quartz ratios and averages plotted for each section 37 6. Zonation and suggested field correlation of the Hickory Creek, Cox Crossing, Hamilton Pool, and Rebecca Creek sections 41 7. Zonation and suggested...

Morton, William Rogers

2012-06-07T23:59:59.000Z

102

Illumination box and camera system  

DOE Patents [OSTI]

A hand portable, field-deployable thin-layer chromatography (TLC) unit and a hand portable, battery-operated unit for development, illumination, and data acquisition of the TLC plates contain many miniaturized features that permit a large number of samples to be processed efficiently. The TLC unit includes a solvent tank, a holder for TLC plates, and a variety of tool chambers for storing TLC plates, solvent, and pipettes. After processing in the TLC unit, a TLC plate is positioned in a collapsible illumination box, where the box and a CCD camera are optically aligned for optimal pixel resolution of the CCD images of the TLC plate. The TLC system includes an improved development chamber for chemical development of TLC plates that prevents solvent overflow.

Haas, Jeffrey S. (San Ramon, CA); Kelly, Fredrick R. (Modesto, CA); Bushman, John F. (Oakley, CA); Wiefel, Michael H. (La Honda, CA); Jensen, Wayne A. (Livermore, CA); Klunder, Gregory L. (Oakland, CA)

2002-01-01T23:59:59.000Z

103

Birch Creek Village Elec Util | Open Energy Information  

Open Energy Info (EERE)

Birch Creek Village Elec Util Birch Creek Village Elec Util Jump to: navigation, search Name Birch Creek Village Elec Util Place Alaska Utility Id 1747 Utility Location Yes Ownership M NERC Location AK Operates Generating Plant Yes Activity Generation Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.6070/kWh Commercial: $0.6150/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Birch_Creek_Village_Elec_Util&oldid=409048" Categories:

104

Panther Creek III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Panther Creek III Wind Farm Panther Creek III Wind Farm Jump to: navigation, search Name Panther Creek III Wind Farm Facility Panther Creek III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.On Climate & Renewables Developer E.On Climate & Renewables Location TX Coordinates 31.9685988°, -99.9018131° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.9685988,"lon":-99.9018131,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

105

Upper Hot Creek Ranch Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Upper Hot Creek Ranch Geothermal Area Upper Hot Creek Ranch Geothermal Area (Redirected from Upper Hot Creek Ranch Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Upper Hot Creek Ranch Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure

106

Ophir Creek Space Heating Low Temperature Geothermal Facility | Open Energy  

Open Energy Info (EERE)

Ophir Creek Space Heating Low Temperature Geothermal Facility Ophir Creek Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Ophir Creek Space Heating Low Temperature Geothermal Facility Facility Ophir Creek Sector Geothermal energy Type Space Heating Location SW, Alaska Coordinates Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

107

Silver Creek Farms Aquaculture Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Creek Farms Aquaculture Low Temperature Geothermal Facility Creek Farms Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Silver Creek Farms Aquaculture Low Temperature Geothermal Facility Facility Silver Creek Farms Sector Geothermal energy Type Aquaculture Location Twin Falls, Idaho Coordinates 42.5629668°, -114.4608711° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

108

RFC Sand Creek Development LLC | Open Energy Information  

Open Energy Info (EERE)

RFC Sand Creek Development LLC RFC Sand Creek Development LLC Jump to: navigation, search Name RFC Sand Creek Development LLC Place Aurora, Colorado Zip 80014 Product Subsidiary of Republic Financial Corporation set up to invest in Sand Creek Energy LLC, a planned gas to liquid facility. Coordinates 39.325162°, -79.54975° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.325162,"lon":-79.54975,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

109

Workplace Charging Challenge Partner: ClipperCreek, Inc.  

Broader source: Energy.gov [DOE]

ClipperCreek is a leading manufacturer of Electric Vehicle Supply Equipment (EVSE). The company strives to advance the plug-in electric vehicle (PEV) market by helping to provide convenient PEV...

110

White Creek and Nine Canyon wind farms Fact Sheet  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(MW) of wind storage and shaping service to help integrate power from the proposed White Creek Wind Project in Klickitat Co., Wash., into the Northwest power system. BPA also...

111

HYDROLOGY OF BISHOP CREEK, CALIFORNIA: AN ISOTOPIC ANALYSIS 1  

E-Print Network [OSTI]

diverting Bishop creek water for hydroelectric power for many years. Recently there has been concern that must be released from the hydroelectric power plants to the channel, during certain times of the year

Standiford, Richard B.

112

Hot Creek Hatchery Aquaculture Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Hot Creek Hatchery Aquaculture Low Temperature Geothermal Facility Hot Creek Hatchery Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Creek Hatchery Aquaculture Low Temperature Geothermal Facility Facility Hot Creek Hatchery Sector Geothermal energy Type Aquaculture Location Mammoth Lakes, California Coordinates 37.648546°, -118.972079° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

113

Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs,  

Open Energy Info (EERE)

Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs, Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs, Three Sisters Area, Central Oregon- Evidence For Renewed Volcanic Activity Or A Long Term Steady State System(Question) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs, Three Sisters Area, Central Oregon- Evidence For Renewed Volcanic Activity Or A Long Term Steady State System(Question) Details Activities (1) Areas (1) Regions (0) Abstract: Here we present the helium and carbon isotope results from the initial study of a fluid chemistry-monitoring program started in the summer of 2001 near the South Sister volcano in central Oregon. The Separation Creek area which is several miles due west of the volcano is the locus of

114

Fourche Creek Wastewater Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Fourche Creek Wastewater Biomass Facility Fourche Creek Wastewater Biomass Facility Jump to: navigation, search Name Fourche Creek Wastewater Biomass Facility Facility Fourche Creek Wastewater Sector Biomass Facility Type Non-Fossil Waste Location Pulaski County, Arkansas Coordinates 34.7538615°, -92.2236667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.7538615,"lon":-92.2236667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

115

Panther Creek I Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Panther Creek I Wind Farm Panther Creek I Wind Farm Jump to: navigation, search Name Panther Creek I Wind Farm Facility Panther Creek I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.On Climate & Renewables Developer E.On Climate & Renewables Location TX Coordinates 32.201592°, -101.406391° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.201592,"lon":-101.406391,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

116

Cedar Creek: a significant paleotectonic feature of Williston basin  

SciTech Connect (OSTI)

Cedar Creek is the major anticlinal structure demarcating the southwest flank of the Williston basin. This pronounced fold developed through a geologic history of recurrent tectonic movements along a northwest-southeast striking fault zone. The four major periods of tectonism documentable in the Cedar Creek area from early Paleozoic through mid-Tertiary affected the local and regional distribution, erosion, and/or preservation, and, though moderately, the depositional facies of sedimentary strata since Ordovician time.

Clement, J.H.

1983-08-01T23:59:59.000Z

117

Ecological effects of contaminants and remedial actions in Bear Creek  

SciTech Connect (OSTI)

Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bear Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.

Southworth, G.R.; Loar, J.M.; Ryon, M.G.; Smith, J.G.; Stewart, A.J. [Oak Ridge National Lab., TN (United States); Burris, J.A. [C. E. Environmental, Inc., Tallahassee, FL (United States)

1992-01-01T23:59:59.000Z

118

Re-Introduction of Lower Columbia River Chum Salmon into Duncan Creek, 2002-2003 Annual Report.  

SciTech Connect (OSTI)

The National Marine Fisheries Service (NMFS) listed Lower Columbia River chum as threatened under the auspices of the Endangered Species Act (ESA) in March of 1999 (64 FR 14508, March 25, 1999). The listing was in response to reduction in abundance from historical levels of more than half a million returning adults to fewer than 10,000 present day spawners. Harvest, loss of habitat, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for the decline of Columbia River chum salmon. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Currently, only two main populations are recognized as genetically distinct in the Columbia River, although spawning has been documented in most lower Columbia River tributaries. The first is located in the Grays River (RKm 34) (Grays population), a tributary of the Columbia, and the second is a group of spawners that utilize the Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks (Lower Gorge population). A possible third population of mainstem spawners, found in the fall of 1999, were located spawning above the I-205 bridge (approximately RKm 182), this aggregation is referred to as the Woods Landing/Rivershore population or the I-205 group. The recovery strategy for Lower Columbia River (LCR) chum as outlined in Hatchery Genetic Management Plans (HGMP) has three main tasks. First, determine if remnant populations of LCR chum salmon exist in LCR tributaries. Second, if such populations exist, develop stock-specific recovery plans involving habitat restoration including the creation of spawning refugias, supplementation if necessary and a habitat and fish monitoring and evaluation plan. If chum have been extirpated from previously utilized streams, develop re-introduction plans that utilize appropriate genetic donor stock(s) of LCR chum salmon and integrate habitat improvement and fry-to-adult survival evaluations. Third, reduce extinction risks to the Grays River chum salmon population by randomly capturing adults in the basin for use in a supplementation program and reintroduction into the Chinook River basin. The Duncan Creek project was developed using the same recovery strategy implemented for LCR chum. Biologists with the WDFW and Pacific States Marine Fisheries Commission (PSMFC) identified Duncan Creek as an ideal upriver location below Bonneville Dam for chum re-introduction. It has several attributes that make it a viable location for a re-introduction project: historically chum salmon were present, the creek is low gradient, has numerous springs/seeps, has a low potential for future development and is located close to a donor population of Lower Gorge chum. The Duncan Creek project has two goals: (1) re-introduction of chum into Duncan Creek by providing off channel high-quality spawning and incubation areas, and (2) to simultaneously evaluate natural recolonization and a supplementation strategy where adults are collected and spawned artificially at a hatchery. For supplementation, eggs are incubated and the fry reared at the Washougal Hatchery to be released back into Duncan Creek. The tasks associated with re-establishing a naturally self-sustaining population include: (1) removing mud, sand and organics present in four of the creek branches and replace with gravels expected to provide maximum egg-to-fry survival rates to a depth of at least two feet; (2) armoring the sides of these channels to reduce importation of sediment by fish spawning on the margins; (3) planting native vegetation adjacent to the channels to stabilize the banks, trap silt and provide shade; (4) annual sampling of gravel in the spawning channels to detect cha

Hillson, Todd D. (Washington Department of Fish and Wildlife, Olympia, WA)

2003-10-15T23:59:59.000Z

119

Reading Comprehension - The Three Branches of Government  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Three Branches of Government The Three Branches of Government The three branches of the federal government are the _________ local state executive , _________ legislative mayor city , and the _________ judge judicial jury branches. The executive branch is responsible for _________ enforcing making interpreting laws. The head of the executive branch is _________ The President The Congress The Supreme Court . The President is the chief _________ law enforcer judge jury of the United States. The President is also the head of the _________ armed forces Supreme Court Congress . The legislative branch _________ enforces makes interprets laws. The legislative branch is known as _________ The President Congress The Supreme Court . Congress consists of two houses, known as the _________ Senate

120

Wolf Creek Nuclear Operating Corporation | Open Energy Information  

Open Energy Info (EERE)

Wolf Creek Nuclear Operating Corporation Wolf Creek Nuclear Operating Corporation Jump to: navigation, search Name Wolf Creek Nuclear Operating Corporation Place Burlington, Kansas Zip 66839-0411 Product Wolf Creek Nuclear Operating Corporation operates the Wolf Creek Generating Station, Kansas' first nuclear power generating station, for three utility owners in Kansas and Missouri. Coordinates 44.446275°, -108.431704° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.446275,"lon":-108.431704,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming.

122

Town of Oak Creek, Colorado (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Creek Creek Place Colorado Utility Id 14054 Utility Location Yes Ownership M NERC Location WECC NERC SPP Yes NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Rate 101: Residential Residential Rate 110: Commercial Commercial Rate 202: General Service Three Phase Commercial Average Rates Residential: $0.0965/kWh Commercial: $0.0842/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Town_of_Oak_Creek,_Colorado_(Utility_Company)&oldid=411791

123

Oak Creek Energy Systems Wind Farm I | Open Energy Information  

Open Energy Info (EERE)

I I Facility Oak Creek Energy Systems Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Oak Creek Energy Systems Developer Oak Creek Energy Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

124

DOE - Office of Legacy Management -- Lost Creek - WY 01  

Office of Legacy Management (LM)

Lost Creek - WY 01 Lost Creek - WY 01 FUSRAP Considered Sites Site: Lost Creek (WY.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

125

Panther Creek II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Creek II Wind Farm Creek II Wind Farm Facility Panther Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.On Climate & Renewables Developer E.On Climate & Renewables Energy Purchaser N/a Location TX Coordinates 32.201592°, -101.406391° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.201592,"lon":-101.406391,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

126

Oak Creek Energy Systems Wind Farm III | Open Energy Information  

Open Energy Info (EERE)

III III Facility Oak Creek Energy Systems Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Oak Creek Energy Systems Developer Oak Creek Energy Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

127

Oak Creek Energy Systems Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Oak Creek Energy Systems Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Oak Creek Energy Systems Developer Oak Creek Energy Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

128

Upper Hot Creek Ranch Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Upper Hot Creek Ranch Geothermal Area Upper Hot Creek Ranch Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Upper Hot Creek Ranch Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

129

Microsoft Word - SilverCreek-Fiber-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

John Brank John Brank Customer Service Engineer - TPC-OLYMPIA Proposed Action: Silver Creek Substation fiber project Budget Information: Work Order 253198, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights of way. Locations: Silver Creek Substation, Lewis County, Washington (T12N R2E SEC17) Proposed by: Bonneville Power Administration (BPA) and Lewis County Public Utility District (PUD) Description of the Proposed Action: BPA proposes to connect a fiber optic cable from an existing Lewis County PUD transmission line into the BPA Silver Creek Substation in Lewis County, Washington. The fiber project is needed to increase transmission system

130

Fast-growing willow shrub named `Fish Creek`  

DOE Patents [OSTI]

A distinct male cultivar of Salix purpurea named `Fish Creek`, characterized by rapid stem growth producing greater than 30% more woody biomass than either of its parents (`94001` and `94006`) and 20% more biomass than a current production cultivar (`SV1`). `Fish Creek` can be planted from dormant stem cuttings, produces multiple stems after coppice, and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested after two to four years of growth. This harvest cycle can be repeated several times. The stem biomass can be chipped and burned as a source of renewable energy, generating heat and/or electricity. `Fish Creek` displays a low incidence of rust disease or damage by beetles or sawflies.

Abrahamson, Lawrence P. (Marcellus, NY); Kopp, Richard F. (Marietta, NY); Smart, Lawrence B. (Geneva, NY); Volk, Timothy A. (Syracuse, NY)

2007-05-08T23:59:59.000Z

131

Protect and Restore Lolo Creek Watershed : Annual Report CY 2005.  

SciTech Connect (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Lolo Creek watershed are coordinated with the Clearwater National Forest and Potlatch Corporation. The Nez Perce Tribe began watershed restoration projects within the Lolo Creek watershed of the Clearwater River in 1996. Fencing to exclude cattle for stream banks, stream bank stabilization, decommissioning roads, and upgrading culverts are the primary focuses of this effort. The successful completion of the replacement and removal of several passage blocking culverts represent a major improvement to the watershed. These projects, coupled with other recently completed projects and those anticipated in the future, are a significant step in improving habitat conditions in Lolo Creek.

McRoberts, Heidi

2006-03-01T23:59:59.000Z

132

White Creek Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

White Creek Wind Power Project White Creek Wind Power Project Facility White Creek Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Last Mile Electric Cooperative Developer Last Mile Electric Cooperative Energy Purchaser Last Mile Electric Cooperative Location Klickitat County Coordinates 45.853153°, -120.289578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.853153,"lon":-120.289578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

133

Tuesday, March 16, 2010 On Box Models  

E-Print Network [OSTI]

to illustrate some of the basics of box models that are used frequently in the field of atmospheric chemistry L". You can guess that it was named after Marie Curie, someone who studied radioactive elements. #12 to exposure to contaminants. One tool that modelers use to assess exposure to pollutants is the "box model

Toohey, Darin W.

134

Optimization Control Strategies for HVAC Terminal Boxes  

E-Print Network [OSTI]

The HVAC terminal boxes are one of the major building HVAC components. They directly impact the building room comfort conditions and the energy costs. How to operate the box in a highly energy efficient way and maintain the room comfort level...

Zhu, Y.; Batten, T.; Noboa, H.; Claridge, D. E.; Turner, W. D.; Liu, M.; Zhou, J.; Cameron, C.; Keeble, D.; Hirchak, R.

2000-01-01T23:59:59.000Z

135

Geology of the Salt Creek area, Mason County, Texas  

E-Print Network [OSTI]

and to the entrapment of. surface water in the fractures. GEOLXiBPBOLOGY The Salt Creek area in @aeon County, Texas is located on the southwestern flank of the Llano Uplift, a structural dome which has been reduced to a topographic basin by erosional processes.... STSUCT "SALCEOL00Y IIegional Structure The Llano region, which includes the Salt Creek area, is a structural dome which has been reduced to a topographic basin by erosional processes. The dose is roughly elliptical with a maximum diameter...

Harwood, William Eugene

1959-01-01T23:59:59.000Z

136

NNSA DP does it again! Collects boxes and boxes of toys | National Nuclear  

National Nuclear Security Administration (NNSA)

DP does it again! Collects boxes and boxes of toys | National Nuclear DP does it again! Collects boxes and boxes of toys | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA DP does it again! Collects boxes ... NNSA DP does it again! Collects boxes and boxes of toys Posted By Office of Public Affairs NNSA Defense Programs today presented hundreds of toys to the U.S. Marine

137

P.O. Box 45339 San Francisco, CA  

E-Print Network [OSTI]

UCSF P.O. Box 45339 San Francisco, CA 94145-0339 UCSF P.O. Box 45339 San Francisco, CA 94145-0339 UCSF P.O. Box 45339 San Francisco, CA 94145-0339 UCSF P.O. Box 45339 San Francisco, CA 94145-0339 UCSF P.O. Box 45339 San Francisco, CA 94145-0339 UCSF P.O. Box 45339 San Francisco, CA 94145-0339 UCSF P

Yamamoto, Keith

138

Cedar Creek Wind Farm II (GE) | Open Energy Information  

Open Energy Info (EERE)

Cedar Creek Wind Farm II (GE) Cedar Creek Wind Farm II (GE) Jump to: navigation, search Name Cedar Creek Wind Farm II (GE) Facility Cedar Creek II (GE) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy Developer BP Wind Energy Energy Purchaser Xcel Energy Location Weld County CO Coordinates 40.868652°, -104.092398° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.868652,"lon":-104.092398,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

139

Oak Creek - Phase 2A | Open Energy Information  

Open Energy Info (EERE)

Phase 2A Phase 2A Jump to: navigation, search Name Oak Creek - Phase 2A Facility Oak Creek - Phase 2A Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Oak Creek Energy Systems Developer M&N Wind Power/Oak Creek Energy Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

140

Oak Creek Phase I Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind Farm Wind Farm Jump to: navigation, search Name Oak Creek Phase I Wind Farm Facility Oak Creek Phase I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Nichimen America/Oak Creek Energy Systems Developer M&N Wind Power/Oak Creek Energy Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

The geoarchaeology of Buttermilk Creek, Bell County, Texas  

E-Print Network [OSTI]

was conducted. Buttermilk Creek is a 13 km stream incised into limestone bedrock with a drainage basin size of 43 kM2 , a stream gradient of 8.5 m/km, and a sinuosity of 1.26. This project was undertaken with two objectives in mind-, to create a...

Gibson, Brandy Deanne

2012-06-07T23:59:59.000Z

142

EIS-0415: Deer Creek Station Energy Facility Project, South Dakota  

Broader source: Energy.gov [DOE]

This EIS analyzes WAPA's decision to approve the interconnection request made by Basin Electric Power Cooperative (Basin Electric) with the USDA Rural Utilities Service (RUS) proposing to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility.

143

Tillman Creek Mitigation Site As-Build Report.  

SciTech Connect (OSTI)

This as-built report describes site conditions at the Tillman Creek mitigation site in South Cle Elum, Washington. This mitigation site was constructed in 2006-2007 to compensate for wetland impacts from the Yakama Nation hatchery. This as-built report provides information on the construction sequence, as-built survey, and establishment of baseline monitoring stations.

Gresham, Doug [Otak, Inc.

2009-05-29T23:59:59.000Z

144

PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM  

E-Print Network [OSTI]

Formerly Utilized Sites Remedial Action Program #12;#12;REVISION 0 PRE-DESIGN INVESTIGATION WORK PLANREVISION 0 PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM FROST AVENUE TO ST. DENIS.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program

US Army Corps of Engineers

145

Workers Remove Glove Boxes from Ventilation at Hanford's Plutonium...  

Office of Environmental Management (EM)

boxes inside the facility's former processing area. This work is performed inside plastic enclosures to limit the spread of contamination. Preparing the glove boxes for...

146

Third report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River  

SciTech Connect (OSTI)

As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. The BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs at ORNL. These are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake (WOL). The investigation of contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system was originally a task of the BMAP but, in 1988, was incorporated into the Resource Conservation and Recovery Act Facility Investigation for the Clinch River, a separate study to assess offsite contamination from all three Department of Energy facilities in Oak Ridge.

Loar, J.M. [ed.] [ed.; Adams, S.M.; Bailey, R.D. [and others] [and others

1994-03-01T23:59:59.000Z

147

Evidence of Streamflow and Sediment Effects on Juvenile Coho and Benthic Macroinvertebrates of Lagunitas Creek and San Geronimo Creek, Marin County, California  

E-Print Network [OSTI]

Resh. 2008. Quantitative linkages among sediment supply,streambed fine sediment, and benthic macroinvertebrates inData: Lagunitas Creek Sediment and Riparian Management Plan,

Ball, Joanie; Diver, Sibyl; Hwan, Jason

2009-01-01T23:59:59.000Z

148

Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch  

SciTech Connect (OSTI)

As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate.

Hinzman, R.L. [ed.; Adams, S.M.; Ashwood, T.L. [Oak Ridge National Lab., TN (United States)] [and others

1995-08-01T23:59:59.000Z

149

Optimization Online - Branch-and-cut and Branch-and-cut-and-price ...  

E-Print Network [OSTI]

Jan 27, 2014 ... Branch-and-cut and Branch-and-cut-and-price Algorithms for the Adjacent Only Quadratic Minimum Spanning Tree Problem. Dilson Lucas...

Dilson Lucas Pereira

2014-01-27T23:59:59.000Z

150

Box Splines Hartmut Prautzsch, Wolfgang Boehm  

E-Print Network [OSTI]

as density functions of the shadows of higher dimensional boxes and half­boxes. Of particular interest and their general theory is given in the book by de Boor, H¨ollig and Riemenschneider [10] who also give valuable the density of the ``shadow'' of the unit cube [0; 1) k under the affine map \\Phi(t) = [v 1 : : : v k ]t from

Liblit, Ben

151

Glove box on vehicular instrument panel  

DOE Patents [OSTI]

A glove box for the upper surface of an automobile dashboard whereby it may be positioned close to the driver. The glove box lid is pivotally supported by arms extending down either side to swing forwardly for opening. A hook is pivotally support adjacent an arm and weighted to swing into engagement with the arm to prevent opening of the lid during abrupt deceleration. A toggle spring assists in maintaining the lid in either the open or closed position.

Atarashi, Kazuya (Saitama, JP)

1985-01-01T23:59:59.000Z

152

Enhanced Stuffing Box Rubbers Test Report  

SciTech Connect (OSTI)

The Rocky Mountain Oilfield Testing Center (RMOTC) and Scott's Oil Field Service tested an enhanced stuffing box rubber at the Naval Petroleum Reserve No. 3. The enhanced stuffing box rubbers have saved money from not having to replace packing as often and not spilling valuable oil on the ground. A reduction in environmental hazards and the cost of cleaning up spilled oil have also been a benefit.

Rochelle, J.

2002-07-01T23:59:59.000Z

153

Third annual Walker Branch Watershed research symposium. Program and abstracts  

SciTech Connect (OSTI)

The methods and concepts of watershed research, originally applied in an experimental or monitoring mode to relatively small catchments, are increasingly being used at larger scales and for specific applied problems. Research at Oak Ridge National Laboratory, the Tennessee Valley Authority, the US Forest Service, and other agencies and institutions participating in this symposium reflects research over a broad range of spatial scales that is being integrated through large-scale experiments along with computer modeling and graphical interfaces. These research projects address the basic atmospheric, geophysical, biogeochemical, and biological processes that regulate the responses of forested ecosystems to natural environmental variation and anthropogenic stresses. Regional and global issues addressed by presentations include emissions of carbon dioxide, methane, and other hydrocarbons; deposition of sulfate, nitrate, and mercury; land-use changes; biological diversity; droughts; and water quality. The reports presented in this symposium illustrate a wide range of methods and approaches and focus more on concepts and techniques than on a specific physical site. Sites and projects that have contributed research results to this symposium include Walker Branch Watershed (DOE), the Coweeta Hydrologic Laboratory and LTER site (USFS and NSF), Great Smoky Mountains National Park (research funded by NPS, TVA, and EPRI), Imnavait Creek, Alaska (DOE), the TVA-Norris Whole-tree Facility (TVA and EPRI), and DOE`s Biomass Program.

Not Available

1992-03-01T23:59:59.000Z

154

Hawaii Wastewater Branch Webpage | Open Energy Information  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Wastewater Branch Webpage Abstract This is the webpage of the Wastewater Branch of the...

155

Molecular Genetic Analysis of Maize Starch Branching Isoforms: Modulation of Starch Branching Enzyme Isoform Activities in Maize to Produce Starch with Novel Branching Architecture and Properties  

SciTech Connect (OSTI)

Modulation of Starch Branching enzyme Isoform Activities in Maize to Produce Starch with Novel Branching Architecture and Properties.

Guiltinan, Mark J.; Thompson, Donald

2009-07-21T23:59:59.000Z

156

Solid State Photovoltaic Research Branch  

SciTech Connect (OSTI)

This report summarizes the progress of the Solid State Photovoltaic Research Branch of the Solar Energy Research Institute (SERI) from October 1, 1988, through September 30,l 1989. Six technical sections of the report cover these main areas of SERIs in-house research: Semiconductor Crystal Growth, Amorphous Silicon Research, Polycrystalline Thin Films, III-V High-Efficiency Photovoltaic Cells, Solid-State Theory, and Laser Raman and Luminescence Spectroscopy. Sections have been indexed separately for inclusion on the data base.

Not Available

1990-09-01T23:59:59.000Z

157

ds-branching-web.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

This This note will be revised after the new CLEO measurements of thirteen D + s branching fractions (P.U.E. Onyisi et al., Phys. Rev. D88, 032009 (2013)) are added to the Particle Listings. More than a dozen papers on the D + s , most of them from the CLEO experiment, have been published since the 2008 Review. We now know enough to attempt an overview of the branching fractions. Figure 1 shows a partial breakdown of the fractions. The rest of this note is about how the figure was constructed. The values shown make heavy use of CLEO measurements of inclusive branching fractions [1] For other data and references cited in the following, see the Listings. Modes with leptons: The bottom (20.0 ± 0.9)% of Fig. 1 shows the fractions for the exclusive modes that include leptons. Measured e + ν e fractions have been doubled to get the semileptonic ℓ + ν fractions. The sum of the exclusive e + ν e fractions is (6.9

158

Widget:ExpandableBoxStart | Open Energy Information  

Open Energy Info (EERE)

ExpandableBoxStart ExpandableBoxStart Jump to: navigation, search The widget creates an expandable text box which can contain any standard wiki content. The box will be collapsed upon page load and can be expanded by clicking anywhere on the box. Once expanded, the box can be collapsed by clicking anywhere on the box header (the original box). Users of this widget must use the Start and End variants of the widget, as shown below. While slightly less convenient for the wiki content developer to use two widgets, this allows full wikitext in the expandable text area, which would otherwise just be limited to plaintext. Note: You must also use the accompanying variant of this widget: Widget:ExpandableBoxEnd Parameters label - text label of the box header (optional, default "More

159

Widget:ExpandableBoxEnd | Open Energy Information  

Open Energy Info (EERE)

ExpandableBoxEnd ExpandableBoxEnd Jump to: navigation, search The widget completes an expandable text box which can contain any standard wiki content. The box will be collapsed upon page load and can be expanded by clicking anywhere on the box. Once expanded, the box can be collapsed by clicking anywhere on the box header (the original box). Users of this widget must use the start and end variants of the widget, as shown below. While slightly less convenient for the wiki content developer to use two widgets, this allows full wikitext in the expandable text area, which would otherwise just be limited to plaintext. Parameters Parameters are set on the starting widget: Widget:ExpandableBoxStart Usage {{#Widget:ExpandableBoxStart|label=Expandable Content|icon=info}} Lorem ipsum stet dicant volumus vim no. Electram deseruisse vix no, eum modus soluta minimum at, est te aperiri dissentiunt.

160

Mesquite Creek, Arizona: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Mesquite Creek, Arizona: Energy Resources Mesquite Creek, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 34.9666691°, -114.568575° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9666691,"lon":-114.568575,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - CX-Wautoma-Rock Creek_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Wautoma-Rock Creek No. 1 500-kV Transmission Line. Budget Information: Work Order # 00234527 PP&A Project No.: PP&A 1507 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: Wautoma-Rock Creek No. 1 500-kV Transmission Line. The proposed project is

162

Microsoft Word - CLT_Tide_Creek_Land_Acquisition_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

Jason Karnezis Jason Karnezis Project Manager - KEWL-4 Proposed Action: Tide Creek Property Funding Fish and Wildlife Project No. & Contract No.: 2010-073-00, BPA-006247 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: T6N, R2W, S25 in Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund Columbia Land Trust (CLT) for the purchase of approximately 41 acres of historic Columbia River floodplain in Columbia County, Oregon. The CLT will own and manage the Tide Creek property for fish and wildlife conservation purposes and BPA will receive a conservation easement to ensure that the habitat

163

Cave Creek, Arizona: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Cave Creek, Arizona: Energy Resources Cave Creek, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 33.8333716°, -111.9507042° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.8333716,"lon":-111.9507042,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

164

Cedar Creek Wind Farm I (Mitsubishi) | Open Energy Information  

Open Energy Info (EERE)

Mitsubishi) Mitsubishi) Jump to: navigation, search Name Cedar Creek Wind Farm I (Mitsubishi) Facility Cedar Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Babcock & Brown/BP America Developer Babcock & Brown/BP America Energy Purchaser Xcel Energy Location Weld County east of Grover CO Coordinates 40.873578°, -104.07825° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.873578,"lon":-104.07825,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

165

Swartz Creek, Michigan: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Swartz Creek, Michigan: Energy Resources Swartz Creek, Michigan: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.9572508°, -83.8305144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.9572508,"lon":-83.8305144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

166

Clear Creek County, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Clear Creek County, Colorado: Energy Resources Clear Creek County, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.6904464°, -105.6412527° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.6904464,"lon":-105.6412527,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

167

Cedar Creek Wind Farm I (GE) | Open Energy Information  

Open Energy Info (EERE)

GE) GE) Jump to: navigation, search Name Cedar Creek Wind Farm I (GE) Facility Cedar Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Babcock & Brown/BP America Developer Babcock & Brown/BP America Energy Purchaser Xcel Energy Location Weld County east of Grover CO Coordinates 40.873578°, -104.07825° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.873578,"lon":-104.07825,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

168

Cedar Creek Wind Farm II (Nordex) | Open Energy Information  

Open Energy Info (EERE)

Farm II (Nordex) Farm II (Nordex) Jump to: navigation, search Name Cedar Creek Wind Farm II (Nordex) Facility Cedar Creek II (Nordex) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy Developer BP Wind Energy Energy Purchaser Xcel Energy Location Weld County CO Coordinates 40.874623°, -104.092569° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.874623,"lon":-104.092569,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

169

Coconut Creek, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Coconut Creek, Florida: Energy Resources Coconut Creek, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.2517482°, -80.1789351° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.2517482,"lon":-80.1789351,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

170

Blue Creek Winter Range: Wildlife Mitigation Project Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Creek Winter Range: Creek Winter Range: Wildlife Mitigation Project Final Environmental Assessment I F 8 - Spokane Tribe of Indians Bonneville POWER ADMINISTRATION B r n u r r o N aF THIS D O C ~ I H ~ E E 1% utifi_;'iUzi: w DOVEA-0939 November1 994 Bureay of Indian Affairs DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

171

Ballenger Creek, Maryland: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Ballenger Creek, Maryland: Energy Resources Ballenger Creek, Maryland: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.3726022°, -77.4352636° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.3726022,"lon":-77.4352636,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

172

Grape Creek, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Grape Creek, Texas: Energy Resources Grape Creek, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 31.5793231°, -100.5475979° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.5793231,"lon":-100.5475979,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

173

Fritz Creek, Alaska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Fritz Creek, Alaska: Energy Resources Fritz Creek, Alaska: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 59.7361111°, -151.2952778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":59.7361111,"lon":-151.2952778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

174

Burnt Creek-Riverview, North Dakota: Energy Resources | Open Energy  

Open Energy Info (EERE)

Burnt Creek-Riverview, North Dakota: Energy Resources Burnt Creek-Riverview, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.9583751°, -100.7982422° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.9583751,"lon":-100.7982422,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

175

Cantua Creek, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Cantua Creek, California: Energy Resources Cantua Creek, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 36.50134°, -120.3162666° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.50134,"lon":-120.3162666,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

176

MHK Projects/Coal Creek Project | Open Energy Information  

Open Energy Info (EERE)

Creek Project Creek Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.3617,"lon":-101.094,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

177

Two Creeks, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Creeks, Wisconsin: Energy Resources Creeks, Wisconsin: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 44.3022186°, -87.5631378° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.3022186,"lon":-87.5631378,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

178

Microsoft Word - Delrio_ChiefJo_FosterCreek_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager -TEP-CSB-1 Proposed Action: D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Douglas County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade communication equipment at three existing facilities in Douglas County, Washington. The work would occur at two of BPA's substations, Del Rio and Chief Joseph, and at BPA's Foster Creek radio site. Activities at these sites are in connection with the retirement of BPA's D analog communication system. At Del Rio, activities would

179

Willow Creek Wildlife Mitigation- Project Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Willow Creek Wildlife Mitigation- Project Willow Creek Wildlife Mitigation- Project Final Environmental Assessment DOE-EA-1 023 Bonneville POWER ADMINISTRATION April 1995 DISCLAIMER This report w a s prepared a s an account of work sponsored by an agency of t h e United States Government. Neither t h e United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or a s s u m e s any legal liability or responsibility for t h e accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents t h a t its use would not infringe privately owned rights. Reference herein to any specific commercial, product, process, or service by trade name, trademark, manufacturer, or otherwise d o e s not necessarily constitute or imply its

180

Francis Creek, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Creek, Wisconsin: Energy Resources Creek, Wisconsin: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 44.199439°, -87.7214755° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.199439,"lon":-87.7214755,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

City of Battle Creek, Nebraska (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

City of Battle Creek City of Battle Creek Place Nebraska Utility Id 1346 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png City Accounts Commercial Commercial All Electric Commercial Commercial- Single Phase Commercial Commercial- Three Phase Commercial Commercial- Three Phase School Commercial Farm- Three Phase Commercial Large Commercial Electric Heating Commercial Large Power Industrial Residential Residential Residential All Electric Residential Rural Residential Residential

182

Asotin Creek Instream Habitat Alteration Projects: 1998 Habitat Evaluation Surveys.  

SciTech Connect (OSTI)

The Asotin Creek Model Watershed Master Plan was completed 1994. The plan was developed by a landowner steering committee for the Asotin County Conservation District (ACCD), with technical support from the various Federal, State and local entities. Actions identified within the plan to improve the Asotin Creek ecosystem fall into four main categories, (1) Stream and Riparian, (2) Forestland, (3) Rangeland, and (4) Cropland. Specific actions to be carried out within the stream and in the riparian area to improve fish habitat were, (a) create more pools, (b) increase the amount of large organic debris (LOD), (c) increase the riparian buffer zone through tree planting, and (d) increase fencing to limit livestock access; additionally, the actions are intended to stabilize the river channel, reduce sediment input, and protect private property. Fish species of main concern in Asotin Creek are summer steelhead (Oncorhynchus mykiss), spring chinook (Oncorhynchus tshawytscha), and bull trout (Salvelinus confluentus). Spring chinook in Asotin Creek are considered extinct (Bumgarner et al. 1998); bull trout and summer steelhead are below historical levels and are currently as ''threatened'' under the ESA. In 1998, 16 instream habitat projects were planned by ACCD along with local landowners. The ACCD identified the need for a more detailed analysis of these instream projects to fully evaluate their effectiveness at improving fish habitat. The Washington Department of Fish and Wildlife's (WDFW) Snake River Lab (SRL) was contracted by the ACCD to take pre-construction measurements of the existing habitat (pools, LOD, width, depth, etc.) within each identified site, and to eventually evaluate fish use within these sites. All pre-construction habitat measurements were completed between 6 and 14 July, 1998. 1998 was the first year that this sort of evaluation has occurred. Post construction measurements of habitat structures installed in 1998, and fish usage evaluation, will be conducted in 1999. As such, this report is confined to 1998 habitat data summaries for each site, with no analytical evaluation.

Bumgarner, Joseph D.

1999-03-01T23:59:59.000Z

183

AVTA: Clipper Creek AC Level 2 Charging System Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the ClipperCreek AC Level 2 charging system for plug-in electric vehicles. This research was conducted by Idaho National Laboratory.

184

Slate Creek Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Slate Creek Hot Springs Geothermal Area Slate Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Slate Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.171,"lon":-114.624,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

185

East Basin Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

East Basin Creek Geothermal Area East Basin Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: East Basin Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.2633,"lon":-114.811,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

186

Smith Creek Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Smith Creek Valley Geothermal Area Smith Creek Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Smith Creek Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.3128,"lon":-117.5493,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

187

Deer Creek Hot Spring Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Deer Creek Hot Spring Geothermal Area Deer Creek Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Deer Creek Hot Spring Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.09167,"lon":-116.05,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

188

Foote Creek Rim I Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Foote Creek Rim I Wind Farm Foote Creek Rim I Wind Farm Facility Foote Creek Rim I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PacifiCorp/Eugene Water & Electric Board Developer SeaWest/Tomen Energy Purchaser PacifiCorp/Eugene Water & Electric Board Location Carbon County WY Coordinates 41.652605°, -106.189914° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.652605,"lon":-106.189914,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

189

Big Creek Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Creek Hot Springs Geothermal Area Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Big Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.3067,"lon":-114.3375,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

190

Indian Creek Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Creek Hot Springs Geothermal Area Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Indian Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.8129,"lon":-115.1229,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

191

Isotopic Analysis At Separation Creek Area (Van Soest, Et Al., 2002) | Open  

Open Energy Info (EERE)

Isotopic Analysis At Separation Creek Area (Van Soest, Et Al., 2002) Isotopic Analysis At Separation Creek Area (Van Soest, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis- Fluid At Separation Creek Area (Van Soest, Et Al., 2002) Exploration Activity Details Location Separation Creek Area Exploration Technique Isotopic Analysis- Fluid Activity Date Usefulness useful DOE-funding Unknown References M. C. van Soest, B. M. Kennedy, W. C. Evans, R. H. Mariner (2002) Mantle Helium And Carbon Isotopes In Separation Creek Geothermal Springs, Three Sisters Area, Central Oregon- Evidence For Renewed Volcanic Activity Or A Long Term Steady State System(Question) Retrieved from "http://en.openei.org/w/index.php?title=Isotopic_Analysis_At_Separation_Creek_Area_(Van_Soest,_Et_Al.,_2002)&oldid=687475"

192

Microsoft Word - ProvisionsFundsColvilleConfederatedTribesPurchaseLoupLoupCreekAeneasCreekProperties_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Roberts Project Manager - KEWU-4 Proposed Action: Provisions of funds to the Colville Confederated Tribes for purchase of the Loup Loup Creek and Aeneas Creek properties. Fish and Wildlife Project No.: 2008-104-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

193

A Watershed Approach to Urban River Restoration: A Conceptual Restoration Plan for Sausal Creek  

E-Print Network [OSTI]

be sustainable considering the hydrologic processes remainprocess of applying the WFD to Sausal Creek, we identified opportunities to improve the sustainable

Ippolito, Teresa; Podolak, Kristen

2008-01-01T23:59:59.000Z

194

E-Print Network 3.0 - area battlement creek Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Units Calwater Subbasins ---(Planning Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Area Hydrologic Units Calwater Subbasins --- (Planning...

195

E-Print Network 3.0 - area battle creek Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Units Calwater Subbasins ---(Planning Watersheds) 88,763 Acres 18060001 3304120101 Kings Creek (7770 Acres) Summary: Area Hydrologic Units Calwater Subbasins --- (Planning...

196

Diagenesis of sandstones from the Douglas Creek member of the Green River Formation (Eocene) at Red Wash field, Uintay County, Utah  

E-Print Network [OSTI]

, sandstone and some limestone and dolomite beds. The Garden Creek Member at Red Wash Field is about 550 ft (168 m) thick. The Parachute Creek Member, overlying the Garden Creek, is largely oil shale, gray shale, and limestone and dolomite beds..., sandstone and some limestone and dolomite beds. The Garden Creek Member at Red Wash Field is about 550 ft (168 m) thick. The Parachute Creek Member, overlying the Garden Creek, is largely oil shale, gray shale, and limestone and dolomite beds...

Ray, Earl Scott

2012-06-07T23:59:59.000Z

197

MD Simulation Study of the Influence of Branch Content on Relaxation and Crystallization of Branched Polyethylene Chains with Uniform Branch Distribution  

E-Print Network [OSTI]

of Branched Polyethylene Chains with Uniform Branch Distribution I. A. HUSSEIN, B. F. ABU-SHARKH* Department-density polyethylene (LLDPE) chains with different levels of branch content (BC), ranging from 10 to 80 branches/1000 C words: MD simulation, Polyethylene, branch content, chain conformation, radius of gyration

Hussein, Ibnelwaleed A.

198

Analysis of stream bed sediments of Four Mile Creek  

SciTech Connect (OSTI)

Until 1988, solutions containing nitric acid, odium hydroxide, low levels of radionuclides (mostly tritiated water) and some metals were discharged to unlined seepage basins at the F and H Areas of the Savannah River Site (SRS) as part of normal operations. The basins are now being closed according to the Resource Conservation and Recovery Act (RCA). As part of the closure, a Part B Post-Closure Care Permit is being prepared. The Part B permit requires information on contaminant concentrations in stream bed sediments in the adjacent Four Mile Creek, which are reported herein. 5 refs., 1 fig., 2 tabs.

Haselow, J.S.

1990-08-13T23:59:59.000Z

199

Product realization of the 2.007 control box  

E-Print Network [OSTI]

A second generation control box using frequency hopping spread spectrum radio was designed and built for use in the Spring 2006 offering of 2.007 Design and Manufacturing I. A third generation control box that could hold ...

Lin, Wey-Jiun

2006-01-01T23:59:59.000Z

200

Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy...  

Broader source: Energy.gov (indexed) [DOE]

Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama" Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama" An image from the video with a woman and the...

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Knowledge-Intensive Case-Based Reasoning in CREEK Agnar Aamodt  

E-Print Network [OSTI]

Knowledge-Intensive Case-Based Reasoning in CREEK Agnar Aamodt Department of Computer.aamodt@idi.ntnu.no Abstract. Knowledge-intensive CBR assumes that cases are enriched with general domain knowledge. In CREEK, there is a very strong coupling between cases and general domain knowledge, in that cases are embedded within

Aamodt, Agnar

202

Microbiology and geochemistry of Little Hot Creek, a hot spring environment in the Long Valley Caldera  

E-Print Network [OSTI]

Microbiology and geochemistry of Little Hot Creek, a hot spring environment in the Long Valley springs located within the Long Valley Caldera, Little Hot Creek (LHC) 1, 3, and 4. All three springs were that springs associated with the Long Valley Caldera contain microbial populations that show some similarities

Ahmad, Sajjad

203

Exploration Of The Upper Hot Creek Ranch Geothermal Resource, Nye County,  

Open Energy Info (EERE)

Of The Upper Hot Creek Ranch Geothermal Resource, Nye County, Of The Upper Hot Creek Ranch Geothermal Resource, Nye County, Nevada Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Exploration Of The Upper Hot Creek Ranch Geothermal Resource, Nye County, Nevada Details Activities (2) Areas (1) Regions (0) Abstract: The Upper Hot Creek Ranch (UHCR) geothermal system had seen no significant exploration activity prior to initiation of this GRED III project. Geochemical geothermometers calculated from previously available but questionable quality analyses of the UHCR hot spring waters indicated possible subsurface temperatures of +320 oF. A complex Quaternary and Holocene faulting pattern associated with a six mile step over of the Hot Creek Range near the UHCR also indicated that this area was worthy of some

204

Branching Brownian Motion with branching at the origin Sergey Bocharov, Simon C. Harris  

E-Print Network [OSTI]

Branching Brownian Motion with branching at the origin Sergey Bocharov, Simon C. Harris University. Dawson and K. Fleischmann [4], K. Fleischmann and J.F. Le Gall [9] or J. Engl¨ander and D. Turaev [7 result is the Strong Law of Large Numbers for the branching system. Theorem 1.7 (SLLN). Let f : R R

Harris, Simon Colin

205

Owl Creek Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Owl Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Owl Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.3439,"lon":-114.4631,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

206

Landslide assessment of Newell Creek Canyon, Oregon City, Oregon  

SciTech Connect (OSTI)

A study has been conducted in Newell Creek Canyon near Oregon City, Oregon, T3S, T2S, R2E. A landslide inventory has located 53 landslides in the 2.8 km[sup 2] area. The landslides range in area from approximately 15,000m[sup 2] to 10m[sup 2]. Past slides cover an approximate 7% of the canyon area. Landslide processes include: slump, slump-translational, slump-earthflow and earthflow. Hard, impermeable clay-rich layers in the Troutdale Formation form the failure planes for most of the slides. Slopes composed of Troutdale material may seem to be stable, but when cuts and fills are produced, slope failure is common because of the perched water tables and impermeable failure planes. Good examples of cut and fill failures are present on Highway 213 which passes through Newell Creek Canyon. Almost every cut and fill has failed since the road construction began. The latest failure is in the fill located at mile-post 2.1. From data gathered, a slope stability risk map was generated. Stability risk ratings are divided into three groups: high, moderate and low. High risk of slope instability is designated to all landslides mapped in the slide inventory. Moderate risk is designated to slopes in the Troutdale Formation greater than 8[degree]. Low risk is designated to slopes in the Troutdale Formation less than 8[degree].

Growney, L.; Burris, L.; Garletts, D.; Walsh, K. (Portland State Univ., OR (United States). Dept. of Geology)

1993-04-01T23:59:59.000Z

207

Asotin Creek Model Watershed Plan: Asotin County, Washington, 1995.  

SciTech Connect (OSTI)

The Northwest Power Planning Council completed its ``Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ``four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity.

Browne, Dave

1995-04-01T23:59:59.000Z

208

Vegetation survey of Four Mile Creek wetlands. [Savannah River Plant  

SciTech Connect (OSTI)

A survey of forested wetlands along upper Four Mile Creek was conducted. The region from Road 3 to the creek headwaters was sampled to evaluate the composition of woody and herbaceons plant communities. All sites were found to fall into either the Nyssa sylvatica (Black Gum) -- Persea borbonia (Red Bay) or Nyssa sylvatica -- Acer rubrum (Red Maple) types. These community types are generally species-rich and diverse. Previous studies (Greenwood et al., 1990; Mackey, 1988) demonstrated contaminant stress in areas downslope from the F- and H-Area seepage basins. In the present study there were some indications of contaminant stress. In the wetland near H-Area, shrub basal area, ground cover stratum species richness, and diversity were low. In the area surrounding the F-Area tree kill zone, ground cover stratum cover and shrub basal area were low and ground cover stratum species richness was low. The moderately stressed site at F-Area also showed reduced overstory richness and diversity and reduced ground cover stratum richness. These results could, however, be due to the very high basal area of overstory trees in both stressed F-Area sites that would reduce light availability to understory plants. No threatened or endangered plant species were found in the areas sampled. 40 refs., 4 figs., 8 tabs.

Loehle, C.

1990-11-01T23:59:59.000Z

209

Oak Ridge Operations PO. Box E  

Office of Legacy Management (LM)

PO. Box E PO. Box E Oak Ridge,Tennessee 37830 E. 6. DeLaney, DRAP, NE-24 COMPLETION OF DECONTAMINATION OF GILMAN HALL, UNIVERSITY OF CALIFORNIA AT BERKELEY Attached is a copy of the final report covering the remedial actions and associated radiological survey work on Gilman Hall. Your attention is called to the last paragraph of the attached letter from Mr. Davis (SAN) which states: "Completion of this work has fulfilled OR's obligation under the Formerly Utilized Sites Remedial Action Program (FuSRAP). No further involvement by OR/FUSRAP in this matter is required." CE-53:EHH Attachment: As Stated E. L. Keller, Director Technical Services Division _I ." ....I__ - . . _. ._ . ..- - --..-l-.l_ U.S. DEPARTMENT OF ENERGY memmcmhm SET. Francisco Operations Office (ESQA)

210

2010sr31_box-remediation.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thursday, November 18, 2010 Thursday, November 18, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 292-2484 paivi.nettamo@srs.gov SRS Recovery Act TRU Waste Project Ahead of Schedule with Box Remediation Program Aiken, SC - The U.S. Department of Energy's Savannah River Site (SRS) started off the last 12 months of the American Recovery and Reinvestment Act with an enormous success in its legacy transuranic (TRU) waste program. The H-Canyon

211

Water Conservation Study for Manastash Creek Water Users, Kittias County, Washington, Final Report 2002.  

SciTech Connect (OSTI)

Manastash Creek is tributary of the Yakima River and is located southwest and across the Yakima River from the City of Ellensburg. The creek drains mountainous terrain that ranges in elevation from 2,000 feet to over 5,500 feet and is primarily snowmelt fed, with largest flows occurring in spring and early summer. The creek flows through a narrow canyon until reaching a large, open plain that slopes gently toward the Yakima River and enters the main stem of the Yakima River at river mile 154.5. This area, formed by the alluvial fan of the Creek as it leaves the canyon, is the subject of this study. The area is presently dominated by irrigated agriculture, but development pressures are evident as Ellensburg grows and develops as an urban center. Since the mid to late nineteenth century when irrigated agriculture was established in a significant manner in the Yakima River Basin, Manastash Creek has been used to supply irrigation water for farming in the area. Adjudicated water rights dating back to 1871 for 4,465 acres adjacent to Manastash Creek allow appropriation of up to 26,273 acre-feet of creek water for agricultural irrigation and stock water. The diversion of water from Manastash Creek for irrigation has created two main problems for fisheries. They are low flows or dewatered reaches of Manastash Creek and fish passage barriers at the irrigation diversion dams. The primary goal of this study, as expressed by Yakama Nation and BPA, is to reestablish safe access in tributaries of the Yakima River by removing physical barriers and unscreened diversions and by adding instream flow where needed for fisheries. The goal expressed by irrigators who would be affected by these projects is to support sustainable and profitable agricultural use of land that currently uses Manastash Creek water for irrigation. This study provides preliminary costs and recommendations for a range of alternative projects that will partially or fully meet the goal of establishing safe access for fisheries in Manastash Creek by reducing or eliminating diversions and eliminating fish passage barriers. Further study and design will be necessary to more fully develop the alternatives, evaluate their environmental benefits and impacts and determine the effect on Manastash Creek water users. Those studies will be needed to determine which alternative has the best combination of benefits and costs, and meets the goal of the Manastash Creek water users.

Montgomery Watson Harza (Firm)

2002-12-31T23:59:59.000Z

212

Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].  

SciTech Connect (OSTI)

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

Asotin County Conservation District

2008-12-10T23:59:59.000Z

213

Streamer branching rationalized by conformal mapping techniques  

Science Journals Connector (OSTI)

Spontaneous branching of discharge channels is frequently observed, but not well understood. We recently proposed a new branching mechanism based on simulations of a simple continuous discharge model in high fields. We here present analytical results for such streamers in the Lozansky-Firsov limit where they can be modeled as moving equipotential ionization fronts. This model can be analyzed by conformal mapping techniques which allow the reduction of the dynamical problem to finite sets of nonlinear ordinary differential equations. Our solutions illustrate that branching is generic for the intricate head dynamics of streamers in the Lozansky-Firsov limit.

Bernard Meulenbroek, Andrea Rocco, and Ute Ebert

2004-06-17T23:59:59.000Z

214

Branching of negative streamers in free flight  

Science Journals Connector (OSTI)

We have recently shown that a negative streamer in a sufficiently high homogeneous field can branch spontaneously due to a Laplacian instability, rather than approach a stationary mode of propagation with fixed radius. In our previous simulations, the streamer started from a wide initial ionization seed on the cathode. We here demonstrate, in improved simulations, that a streamer emerging from a single electron branches in the same way. In fact, though the evolving streamer is much more narrow, it branches after an even shorter propagation distance.

Andrea Rocco, Ute Ebert, and Willem Hundsdorfer

2002-09-24T23:59:59.000Z

215

The Intermediate Scale Branch of the Landscape  

E-Print Network [OSTI]

Three branches of the string theory landscape have plausibly been identified. One of these branches is expected to exhibit a roughly logarithmic distribution of supersymmetry breaking scales. The original KKLT models are in this class. We argue that certain features of the KKLT model are generic to this branch, and that the resulting phenomenology depends on a small set of discrete choices. As in the MSSM, the weak scale in these theories is tuned; a possible explanation is selection for the dark matter density.

Michael Dine

2005-12-04T23:59:59.000Z

216

EA-1988: NFSC (Northwest Fisheries Science Center) Earthen Drainage Channel, Burley Creek Hatchery, Port Orchard, Washington  

Broader source: Energy.gov [DOE]

The National Oceanic and Atmospheric Administration (NOAA), with DOEs Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of a NOAA Northwest Fisheries Science Center proposal to construct an earthen drainage channel at its Burley Creek Hatchery in Kitsap County, Washington. The project would facilitate increased discharge of treated effluent from the hatchery facility into the adjacent Burley Creek. BPAs proposal is to fund the project. The project website is http://efw.bpa.gov/environmental_services/Document_Library/Burley_Creek/.

217

Brood Year 2004: Johnson Creek Chinook Salmon Supplementation Report, June 2004 through March 2006.  

SciTech Connect (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River spring/summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek to spawn through artificial propagation. This was the sixth season of adult chinook broodstock collection in Johnson Creek following collections in 1998, 2000, 2001, 2002, and 2003. Weir installation was completed on June 21, 2004 with the first chinook captured on June 22, 2004 and the last fish captured on September 6, 2004. The weir was removed on September 18, 2004. A total of 338 adult chinook, including jacks, were captured during the season. Of these, 211 were of natural origin, 111 were hatchery origin Johnson Creek supplementation fish, and 16 were adipose fin clipped fish from other hatchery operations and therefore strays into Johnson Creek. Over the course of the run, 57 natural origin Johnson Creek adult chinook were retained for broodstock, transported to the South Fork Salmon River adult holding and spawning facility and held until spawned. The remaining natural origin Johnson Creek fish along with all the Johnson Creek supplementation fish were released upstream of the weir to spawn naturally. Twenty-seven Johnson Creek females were artificially spawned with 25 Johnson Creek males. Four females were diagnosed with high bacterial kidney disease levels resulting in their eggs being culled. The 27 females produced 116,598 green eggs, 16,531 green eggs were culled, with an average eye-up rate of 90.6% resulting in 90,647 eyed eggs. Juvenile fish were reared indoors at the McCall Fish Hatchery until November 2005 and then transferred to the outdoor rearing facilities during the Visual Implant Elastomer tagging operation. These fish continued rearing in the outdoor collection basin until release in March 2006. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 12,056 of the smolts released were also tagged with Passive Integrated Transponder tags. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 90,450 smolts were released directly into Johnson Creek on March 13 through 15, 2006.

Gebhards, John S.; Hill, Robert; Daniel, Mitch [Nez Perce Tribe

2009-02-19T23:59:59.000Z

218

Microsoft Word - MissionCreek_Kingston_Acquisition_CX_final.doc  

Broader source: Energy.gov (indexed) [DOE]

purchase purchase of the Mission Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract # BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 19 North, Range 21 West, Section 33 of the Dixon Quad, in Lake County, Montana Proposed by: Bonneville Power Administration (BPA) and CSKT Description of the Proposed Action: BPA proposes to fund the acquisition of 12 acres of property

219

Foote Creek Rim II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Facility Foote Creek Rim II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer SeaWest Energy Purchaser Bonneville Power Admin Location Carbon County WY Coordinates 41.663881°, -106.186001° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.663881,"lon":-106.186001,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

220

Microsoft Word - CX_PistolCreek_Final.doc  

Broader source: Energy.gov (indexed) [DOE]

25, 2011 25, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes for purchase of the Pistol Creek Property. Fish and Wildlife Project No.: 2002-003-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 17 North, Range 18 West, Sections 30 and 31, Lake County, MT.

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Foote Creek Rim IV Wind Farm | Open Energy Information  

Open Energy Info (EERE)

IV Wind Farm IV Wind Farm Facility Foote Creek Rim IV Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer SeaWest Energy Purchaser Bonneville Power Admin Location Carbon County WY Coordinates 41.626456°, -106.202095° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.626456,"lon":-106.202095,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

222

Foote Creek Rim III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

III Wind Farm III Wind Farm Facility Foote Creek Rim III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer SeaWestM&N Wind Power Energy Purchaser Xcel Energy Location Carbon County WY Coordinates 41.643488°, -106.198876° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.643488,"lon":-106.198876,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

223

Microsoft Word - CX_Beaver Creek.doc  

Broader source: Energy.gov (indexed) [DOE]

Clearance Memorandum Clearance Memorandum Jay Marcotte Project Manager - KEWU-4 Proposed Action: Bonneville Power Administration (BPA) funding to acquire the Beaver Creek property and to maintain this property for fish and wildlife habitat protection. Budget Information: Work Order # 00225478 Fish and Wildlife Project No.: 2009-003-00, 43451 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

224

Town of Black Creek, North Carolina (Utility Company) | Open Energy  

Open Energy Info (EERE)

North Carolina (Utility Company) North Carolina (Utility Company) Jump to: navigation, search Name Town of Black Creek Place North Carolina Utility Id 202 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png EP-I Renewable Energy Industrial Industrial GS3 Electric GS4 Gov Office GS5 Commercial/Demand Commercial GS5 Commercial/Demand(with Renewable Portfolio Standards) Commercial RS 1 Residential Residential RS 1 Residential(with Renewable Portfolio Standards) Residential

225

Microsoft Word - CX_ThorneCreek_Final.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to the Confederated Salish and Kootenai Tribes for purchase of the Thorne Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract CR-201269 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment.

226

Protect and Restore Mill Creek Watershed : Annual Report CY 2005.  

SciTech Connect (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership, more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. Starting in FY 2002, continuing into 2004, trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-stream crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed, and one high priority culvert was replaced in 2004. Maintenance to the previously built fence was also completed.

McRoberts, Heidi

2006-03-01T23:59:59.000Z

227

Panther Creek: A flexible approach to plant enhancement  

SciTech Connect (OSTI)

The Panther Creek Energy Facility (PCEF), an 83 MW waste coal-fired Independent Power Producer in Nesquehoning, Pennsylvania, offers an excellent education on project turnaround. Managed by Panther Creek Partners and operated and maintained by Constellation Operating Services, the facility, designed and built by Bechtel Power Corporation, consists of two Pyroflow Circulating Fluidized Bed Boilers each rated 380,000 lbs/hr, 1500 psig, 955{degrees}F, supplying steam to a GEC-Alsthom turbine generator. Since the beginning of commercial operation in October 1992, PCEF was plagued by numerous operational and reliability problems with the fuel- and ash-handling systems, primarily due to the use of below-design specification fuel. The facility was designed to burn 1488 tons per day of anthracite waste fuel (culm) specified at 7760 Btu/lb, sized 1/4 inch minus and 10% moisture. Unfortunately, miscalculations of the supply of this fuel in the vicinity made this level impossible to achieve without considerable transportation expenses. Contractual and permit obligations also required the plant to utilize the on-site culm. Nonetheless, the use of the on-site culm meant that the plant would face other expenditures because of its loss of efficiency. Given the below-design fuel, PCEF faced a 51% increase in fuel consumption, 113% increase in ash generation, and a 50% increase in limestone usage. Likewise, due to the increased demand on the material-handling facilities, the plant was incapable of achieving full load on a daily basis. PCEF had a lost capacity of 5.7% (6.4% overall when accounting for planned outages) during the period of 1993 and 1994.

Gawel, R. [Panther Creek Energy Facility, Nesquehoning, PA (United States)

1995-12-31T23:59:59.000Z

228

Unlocking the Mysteries of the Bounding Box  

E-Print Network [OSTI]

Service is available online at http://www.fs.fed.us/institute/ecoregions/ eco_download.html 16. The ?1:2,000,000-Scale Hydrologic Unit Boundaries? from the US Geological Survey is available online at http://water.usgs.gov/GIS/huc.html 17. Circularity...Coordinates Series A, No. 2 Unlocking the Mysteries of the Bounding Box Persistent URL for citation: http://purl.oclc.org/coordinates/a2.pdf Date of Publication: 08/29/05 Douglas R. Caldwell Douglas R. Caldwell (e-mail: Douglas.R. Caldwell...

Caldwell, Douglas R.

2005-08-29T23:59:59.000Z

229

Long Branch Capital | Open Energy Information  

Open Energy Info (EERE)

Branch Capital Branch Capital Jump to: navigation, search Name Long Branch Capital Place Austin, Texas Zip 78744 Sector Efficiency, Renewable Energy Product Long Branch Capital makes minority investments in private companies focused on renewable energy, clean technology, and efficiency Coordinates 30.267605°, -97.742984° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.267605,"lon":-97.742984,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

230

Regulation of Branching by Phytochrome and Phytohormones  

E-Print Network [OSTI]

Light is the fundamental source of energy and information throughout the plant life cycle. Light signals regulate plant architecture and branching, key processes that determine biomass production and grain yield. Low red (R) to far-red (FR) light...

Krishnareddy, Srirama R.

2012-07-16T23:59:59.000Z

231

Electrochemical Branched-DNA Assay for Polymerase Chain Reaction...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Branched-DNA Assay for Polymerase Chain Reaction-Free Detection and Quantification of Oncogenes in Messenger RNA Electrochemical Branched-DNA Assay for Polymerase Chain...

232

Magnify Credit Union- South Lakeland Branch  

High Performance Buildings Database

Lakeland, FL The new branch credit union is located on a previously developed site and was designed to wrap around an existing building that is the home of a "neighborhood favorite" ice cream shop. The design of this flagship branch aligns with the client's mission of financial education and environmental awareness. Programmatic flexibility of both private and public spaces weaves the project into the community fabric by providing a place for events that can develop the credit union's identity over time.

233

Biomonitoring of fish communities, using the Index of Biotic Integrity (IBI) in Rabbit Creek-Cat Creek Watershed, Summer 1992  

SciTech Connect (OSTI)

The Index of Biotic Integrity (IBI) is a method for evaluating the health of water bodies and watersheds by analyzing sample catches of fishes. Sites are scored on a numerical scale of 12--60 and on that basis assigned to a ``bioclass`` ranging from ``very poor`` to ``excellent.`` Overall, the major causes of depressed IBI scores in the Rabbit Creek watershed would appear to be: Organic pollution, mostly from livestock, but also from agricultural runoff and possible septic tank failures; sedimentation, principally from stream bank damage by cattle, also possibly from agriculture and construction; toxic pollution from agrochemicals applied to Holly Springs Golf course and agricultural fields` and Warming of water and evaporation loss due to elimination of shade on stream banks and construction of ponds.

Not Available

1993-08-01T23:59:59.000Z

234

Geothermometry At Upper Hot Creek Ranch Area (Benoit & Blackwell, 2006) |  

Open Energy Info (EERE)

Geothermometry At Upper Hot Creek Ranch Area (Benoit & Blackwell, 2006) Geothermometry At Upper Hot Creek Ranch Area (Benoit & Blackwell, 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Upper Hot Creek Ranch Area (Benoit & Blackwell, 2006) Exploration Activity Details Location Upper Hot Creek Ranch Area Exploration Technique Geothermometry Activity Date Usefulness useful DOE-funding Unknown Notes Ten water samples were collected for chemical analysis and interpretation. Analyses of three samples of the UHCR thermal give predicted subsurface temperatures ranging from 317 to 334 oF from the Na-K-Ca, silica (quartz), and Na-Li geothermometers. The fact that all three thermometers closely agree gives the predictions added credibility. References Dick Benoit, David Blackwell (2006) Exploration Of The Upper Hot

235

DOE - Office of Legacy Management -- Dow Chemical Co - Walnut Creek - CA 02  

Office of Legacy Management (LM)

Dow Chemical Co - Walnut Creek - CA Dow Chemical Co - Walnut Creek - CA 02 FUSRAP Considered Sites Site: Dow Chemical Co. - Walnut Creek (CA.02 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 2800 Mitchell Drive , Walnut Creek , California CA.02-1 Evaluation Year: 1987 CA.02-2 CA.02-3 Site Operations: From 1947 to 1957, conducted process studies and experimental investigations on different uranium and thorium-bearing ores; pilot-scale solvent extraction of uranium from phosphoric acid; liquid waste disposal studies CA.02-1 CA.02-4 CA.02-5 Site Disposition: Eliminated - Radiation levels below criteria CA.02-6 CA.02-7 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium CA.02-1 CA.02-4

236

Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility Horse Creek Hot Spring Sector Geothermal energy Type Pool and Spa Location North Fork, Idaho Coordinates Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

237

Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility Facility Cement Creek Ranch Sector Geothermal energy Type Pool and Spa Location Crested Butte, Colorado Coordinates 38.8697146°, -106.9878231° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

238

Kids vs. Mercury: Food fight at the creek | Y-12 National Security...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kids vs. Mercury: Food ... Kids vs. Mercury: Food fight at the creek Posted: May 7, 2014 - 5:26pm | Y-12 Report | Volume 10, Issue 2 | 2014 For years Y-12 has dealt with...

239

Tribal Decision-Making and Intercultural Relations: Crow Creek Agency, 1863-1885  

E-Print Network [OSTI]

Lower Yanktonai residents experienced great change during the first two decades at the Crow Creek agency in Dakota Territory. This essay traces the evolution of relations between tribal members, federal agents, and ...

Galler, Robert

2002-03-01T23:59:59.000Z

240

Hydrocarbon trapping mechanisms in the Miller Creek area of the Powder River Basin, Wyoming  

E-Print Network [OSTI]

'' 1975 43'W'79 ABSTRACT Hydrocarbon Trapoing Mechanisms in the Miller Creek Area of the Powder River Basin, Wyoming. (May 1975) Jennifer Ann Armstrong, B. S. , University of Texas at Austin Chairman of Advisory Committee: 17r. Robert. R. Berg...

Armstrong, Jennifer Ann

1975-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Thermal Gradient Holes At Upper Hot Creek Ranch Area (Benoit & Blackwell,  

Open Energy Info (EERE)

Hot Creek Ranch Area (Benoit & Blackwell, Hot Creek Ranch Area (Benoit & Blackwell, 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes At Upper Hot Creek Ranch Area (Benoit & Blackwell, 2006) Exploration Activity Details Location Upper Hot Creek Ranch Area Exploration Technique Thermal Gradient Holes Activity Date Usefulness not useful DOE-funding Unknown Notes Ten temperature gradient holes up to 500' deep were initially planned but higher than anticipated drilling and permitting costs within a fixed budget reduced the number of holes to five. Four of the five holes drilled to depths of 300 to 400' encountered temperatures close to the expected regional thermal background conditions. These four holes failed to find any evidence of a large thermal anomaly surrounding the UHCR hot springs. The

242

EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe,  

Broader source: Energy.gov (indexed) [DOE]

5: Lolo Creek Permanent Weir Construction near town of 5: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho Summary DOE's Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis.

243

Trout Creek, Oregon Watershed Assessment; Findings, Condition Evaluation and Action Opportunities, 2002 Technical Report.  

SciTech Connect (OSTI)

The purpose of the assessment is to characterize historical and current watershed conditions in the Trout Creek Watershed. Information from the assessment is used to evaluate opportunities for improvements in watershed conditions, with particular reference to improvements in the aquatic environment. Existing information was used, to the extent practicable, to complete this work. The assessment will aid the Trout Creek Watershed Council in identifying opportunities and priorities for watershed restoration projects.

Runyon, John

2002-08-01T23:59:59.000Z

244

Geology of the Middle Beaver Creek area, Mason and Gillespie Counties, Texas  

E-Print Network [OSTI]

AREA, NASGR AEG GILhNPIR COGRTIES, TEIAB ABSTRACT The Middle Beaver Creek area is situated on the soutlwsst flank of the Llano ?plift region in Mason and Gillespie Counties, Texas Hooks of Presa?brian, Psleosoie, Mesosois, and Genosois age... ' Figure 1. ? Map of' part of Mason and Gillespie Counties, Texass showing location of' the Middle Beaver Creek Area, on aoetats oosered aerial photographs. In order to aoourateIp locate and plot the oontaots asd faults, the photographs vere studies...

Peterson, Don Hamilton

2012-06-07T23:59:59.000Z

245

The investigation of the Caney Creek shipwreck archaeological site 41MG32  

E-Print Network [OSTI]

in Matagorda, Texas, 1860, Produced by Ed Lang. . . . , , . . . . . . . . . . . . . . . 18 Figure 7. Figure 8. Figure 9. Fitnire 10. Location of Caney Creek in Southeast Texas. . Soil types of Matagorda County. Portrait of J. B. Hawkins. Map showing... of the Caney Creek Shipwreck Archaeological Site 4 IMG32. (August 1998) David Layne Hedrick, B. A. , University of North Texas Chair of Advisory Committee: Dr. Frederick M Hocker The history of river transportation in the interior of Texas has received...

Hedrick, David Layne

2012-06-07T23:59:59.000Z

246

Ex Parte Memorandum on Set Top Boxes and Network Equipment |...  

Energy Savers [EERE]

provides a summary of a May 1, 2012, meeting with DOE officials concerning potential test procedures and energy conservation standards for set-top boxes and network equipment....

247

NORTH HILL CREEK 3-D SEISMIC EXPLORATION PROJECT  

SciTech Connect (OSTI)

Wind River Resources Corporation (WRRC) received a DOE grant in support of its proposal to acquire, process and interpret fifteen square miles of high-quality 3-D seismic data on non-allotted trust lands of the Uintah and Ouray (Ute) Indian Reservation, northeastern Utah, in 2000. Subsequent to receiving notice that its proposal would be funded, WRRC was able to add ten square miles of adjacent state and federal mineral acreage underlying tribal surface lands by arrangement with the operator of the Flat Rock Field. The twenty-five square mile 3-D seismic survey was conducted during the fall of 2000. The data were processed through the winter of 2000-2001, and initial interpretation took place during the spring of 2001. The initial interpretation identified multiple attractive drilling prospects, two of which were staked and permitted during the summer of 2001. The two initial wells were drilled in September and October of 2001. A deeper test was drilled in June of 2002. Subsequently a ten-well deep drilling evaluation program was conducted from October of 2002 through March 2004. The present report discusses the background of the project; design and execution of the 3-D seismic survey; processing and interpretation of the data; and drilling, completion and production results of a sample of the wells drilled on the basis of the interpreted survey. Fifteen wells have been drilled to test targets identified on the North Hill Creek 3-D Seismic Survey. None of these wildcat exploratory wells has been a dry hole, and several are among the best gas producers in Utah. The quality of the data produced by this first significant exploratory 3-D survey in the Uinta Basin has encouraged other operators to employ this technology. At least two additional 3-D seismic surveys have been completed in the vicinity of the North Hill Creek Survey, and five additional surveys are being planned for the 2004 field season. This project was successful in finding commercial oil, natural gas and natural gas liquids production on a remote part of the Uintah & Ouray Reservation. Much of the natural gas and natural gas liquids are being produced from the Wingate Formation, which to our knowledge has never produced commercially anywhere. Another large percentage of the natural gas is being produced from the Entrada Formation which has not previously produced in this part of the Uinta Basin. In all, at least nine geologic formations are contributing hydrocarbons to these wells. This survey has clearly established the fact that high-quality data can be obtained in this area, despite the known obstacles.

Marc T. Eckels; David H. Suek; Denise H. Harrison; Paul J. Harrison

2004-05-06T23:59:59.000Z

248

Fermi Site Office Post Office Box 2000  

Broader source: Energy.gov (indexed) [DOE]

Fermi Site Office Fermi Site Office Post Office Box 2000 Batavia, Illinois 60510 JAN 14 2011 Scott Blake Harris, General Counsel GC-1 FORS SUBJECT: FERMl SITE OFFICE (FSO) 201 1 ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUIMMARY The Department of Energy (DOE) Order 451 .I B, Change 2, requires Secretarial Officers and Heads of Field Organizations to submit a NEPA Annual Planning Summary to the Office of General Counsel. Per your December 8, 2010 memorandum and guidance provided by the Office of NEPA Policy and Compliance (GC-54), our Annual NEPA Planning Summary is enclosed. We have identified one on-going environmental assessment (EA). No environmental impact statements (EISs) are on-going and two new EAs and one EIS are expected to be prepared beginning in the next 12 to 24 months.

249

Numerical convergence of the branching time of negative streamers  

Science Journals Connector (OSTI)

Discharge streamers in experiments branch frequently. Arrays et al. [Phys. Rev. Lett. 88, 174502 (2002)] presented simulations of branching streamers and interpreted them as physical branching events. The numerical results were criticized by Kulikovsky [Phys. Rev. Lett. 89, 229401 (2002)]. Using an adaptive grid algorithm, we here present numerical experiments on the effect of grid resolution on streamer branching. The convergence of branching time with stepwise finer grid sizes provides a quantitative correction on the earlier, low-resolution results in overvolted gaps. Furthermore, streamers can branch even in undervolted, but sufficiently long gaps, but fewer branching modes are accessible than in higher fields.

Carolynne Montijn, Ute Ebert, and Willem Hundsdorfer

2006-06-28T23:59:59.000Z

250

Masquerader: High Mobility Group Box-1 and Cancer  

Science Journals Connector (OSTI)

...Since its identification a third of a century ago, the high-mobility group box-1...transcription factor modifications, including cAMP-responsive element binding protein...Since its identification a third of a century ago, the high-mobility group box-1...

Jessica E. Ellerman; Charles K. Brown; Michael de Vera; Herbert J. Zeh; Timothy Billiar; Anna Rubartelli; and Michael T. Lotze

2007-05-15T23:59:59.000Z

251

Fracture history of the Northern Piceance Creek Basin, Northwestern Colorado  

SciTech Connect (OSTI)

The fracture pattern of the Northern Piceance Creek Basin, in Rio Blanco and Garfield Counties of Northwestern Colorado, evolved during at least four periods of brittle failure in Eocene rocks of the Green River and overlying Uinta Formations. Fractures in these rocks of are interest to hydrologists because matrix permeabilities in both formations are low, due either to poor sorting and interstitial calcite cement (Uinta sandstones) or to low pore volume and growth of authigenic minerals (Green River oil shales). Ground water at shallow to intermediate depths thus circulates mostly through secondary openings such as fractures and through voids created by the dissolution of nahcolite and halite. Fracture-induced permeabilities probably dominate most at shallow depths, where fractures are most abundant, apertures of fracture walls are greates, and solution openings are least common. Shallow, fracture-dominated aquifers are strongly anisotropic. At deeper levels, in leached zones of the ''saline facies'' of the lower part of the Green River Formation, solution openings contribute greatly to fluid flow and permeabilities probably are less direction dependent.

Verbeek, E.R.; Grout, M.A.

1983-04-01T23:59:59.000Z

252

Silver Creek-Morton Transmission Project: Environmental assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) will in 1989, replace the Silver Creek-Morton 69-kV transmission line with a line of 115-kV construction and, in the late 1990's, add capacitors at Morton Substation. Portions of the new line would be constructed on new right-of-way adjacent to the old 69-kV line and portions would be constructed on the same right-of-way. Construction on adjacent right-of-way would require new right-of-way up to 50 feet wide on one side of the present right-of-way. BPA would then release to private ownership right-of-way up to 50 feet wide on the opposite side, after the old line has been removed. Parts of the new line would be constructed on H-frame wood-pole sructures and parts on single wood-pole structures, depending on land use constraints. 16 refs., 3 figs., 3 tabs.

Not Available

1986-06-01T23:59:59.000Z

253

West Foster Creek Expansion Project 2007 HEP Report.  

SciTech Connect (OSTI)

During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

Ashley, Paul R.

2008-02-01T23:59:59.000Z

254

Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

1994-11-01T23:59:59.000Z

255

Floods on Nottely River and Martin, Peachtree, and Slow Creeks in Cherokee County, North Carolina. Flood report  

SciTech Connect (OSTI)

This report describes the flood situation along the Nottely River from the North Carolina-Georgia State line, at stream mile 18.72, downstream to the head of Hiwassee Reservoir backwater, stream mile 6.50; Martin Creek from mile 6.12 downstream to mile 1.38; Peachtree Creek from Ammon Bottom at mile 4.78 downstream to its mouth at Hiwassee River mile 100,68; and Slow Creek from mile 3.15 downstream to its mouth at Peachtree Creek mile 1.98.

Not Available

1985-09-01T23:59:59.000Z

256

Stream migration and sediment movement on Lower Cache Creek from Capay Dam to Interstate 5 at Yolo, CA.  

E-Print Network [OSTI]

??The geomorphology of waterways like Cache Creek has been modified not only by natural flooding events, but also by human activity. Aggregate mining, agriculture and (more)

Leathers, Tami

2010-01-01T23:59:59.000Z

257

On cyclic branched coverings of prime knots  

Science Journals Connector (OSTI)

......2-spheres with four points with branching...2-suborbifolds lifts to the JSJ-collection...holes and one cone point; (iv) a disc...holes and one cone point; (v) a disc...There are four possible cases...torus. The knot K lifts to a singular......

Michel Boileau; Luisa Paoluzzi

2008-07-01T23:59:59.000Z

258

Measurement of the D -> pipi branching fractions  

E-Print Network [OSTI]

Using data from CLEO II at the Cornell Electron Storage Ring we provide a new measurement of the branching fraction for D0 --> pi+pi-, and we present the first measurements of D0 --> pi0pi0 and of D+ --> pi+pi0, which is ...

Ammar, Raymond G.; Ball, S.; Baringer, Philip S.; Coppage, Don; Copty, N.; Davis, Robin E. P.; Hancock, N.; Kelly, M.; Kwak, Nowhan; Lam, H.

1993-09-01T23:59:59.000Z

259

Measurement of the D*(2010) branching fractions  

E-Print Network [OSTI]

We report a measurement of the D*+ and D*0 decay branching fractions based on 780 pb-1 of data collected with the CLEO II detector. For radiative D*+ decay, we obtain an upper limit, B(D*+ --> D+ gamma) < 4.2% (90% confidence ...

Ammar, Raymond G.; Ball, S.; Baringer, Philip S.; Coppage, Don; Copty, N.; Davis, Robin E. P.; Hancock, N.; Kelly, M.; Kwak, Nowhan; Lam, H.

1992-10-01T23:59:59.000Z

260

Measure Guideline: Optimizing the Configuration of Flexible Duct Junction Boxes  

SciTech Connect (OSTI)

This measure guideline offers additional recommendations to heating, ventilation, and air conditioning (HVAC) system designers for optimizing flexible duct, constant-volume HVAC systems using junction boxes within Air Conditioning Contractors of America (ACCA) Manual D guidance (Rutkowski, H. Manual D -- Residential Duct Systems, 3rd edition, Version 1.00. Arlington, VA: Air Conditioning Contractors of America, 2009.). IBACOS used computational fluid dynamics software to explore and develop guidance to better control the airflow effects of factors that may impact pressure losses within junction boxes among various design configurations (Beach, R., Prahl, D., and Lange, R. CFD Analysis of Flexible Duct Junction Box Design. Golden, CO: National Renewable Energy Laboratory, submitted for publication 2013). These recommendations can help to ensure that a system aligns more closely with the design and the occupants' comfort expectations. Specifically, the recommendations described herein show how to configure a rectangular box with four outlets, a triangular box with three outlets, metal wyes with two outlets, and multiple configurations for more than four outlets. Designers of HVAC systems, contractors who are fabricating junction boxes on site, and anyone using the ACCA Manual D process for sizing duct runs will find this measure guideline invaluable for more accurately minimizing pressure losses when using junction boxes with flexible ducts.

Beach, R.; Burdick, A.

2014-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Simulation of contaminated sediment transport in White Oak Creek basin  

SciTech Connect (OSTI)

This paper presents a systematic approach to management of the contaminated sediments in the White Oak Creek watershed at Oak Ridge National Laboratory near Oak Ridge, Tennessee. The primary contaminant of concern is radioactive cesium-137 ({sup 137}Cs), which binds to soil and sediment particles. The key components in the approach include an intensive sampling and monitoring system for flood events; modeling of hydrological processes, sediment transport, and contaminant flux movement; and a decision framework with a detailed human health risk analysis. Emphasis is placed on modeling of watershed rainfall-runoff and contaminated sediment transport during flooding periods using the Hydrologic Simulation Program- Fortran (HSPF) model. Because a large number of parameters are required in HSPF modeling, the major effort in the modeling process is the calibration of model parameters to make simulation results and measured values agree as closely as possible. An optimization model incorporating the concepts of an expert system was developed to improve calibration results and efficiency. Over a five-year simulation period, the simulated flows match the observed values well. Simulated total amount of sediment loads at various locations during storms match with the observed values within a factor of 1.5. Simulated annual releases of {sup 137}Cs off-site locations match the data within a factor of 2 for the five-year period. The comprehensive modeling approach can provide a valuable tool for decision makers to quantitatively analyze sediment erosion, deposition, and transport; exposure risk related to radionuclides in contaminated sediment; and various management strategies.

Bao, Y.; Clapp, R.B.; Brenkert, A.L. [Oak Ridge National Lab., TN (United States); Moore, T.D. [Department of Civil and Environmental Engineering, University of Tennessee, Knoxville, TN (United States); Fontaine, T.A. [Department of Civil and Environmental Engineering, South Dakota School of Mines and Technology, Rapid City, SD (United States)

1995-12-31T23:59:59.000Z

262

Dissolved Oxygen in Allen CreekDissolved Oxygen in Allen Creek Dissolved oxygen (DO) enters the water by diffusion from air, as a by-product of photosynthesis and  

E-Print Network [OSTI]

Dissolved Oxygen in Allen CreekDissolved Oxygen in Allen Creek Dissolved oxygen (DO) enters and rapids. There is an inverse relationship between temperature and DO, i.e. colder water holds more oxygen it supplies oxygen to aquatic organisms. Higher DO levels also give the water a better taste. Figure 2. During

Tyler, Christy

263

Safeguards Approaches for Black Box Processes or Facilities  

SciTech Connect (OSTI)

The objective of this study is to determine whether a safeguards approach can be developed for black box processes or facilities. These are facilities where a State or operator may limit IAEA access to specific processes or portions of a facility; in other cases, the IAEA may be prohibited access to the entire facility. The determination of whether a black box process or facility is safeguardable is dependent upon the details of the process type, design, and layout; the specific limitations on inspector access; and the restrictions placed upon the design information that can be provided to the IAEA. This analysis identified the necessary conditions for safeguardability of black box processes and facilities.

Diaz-Marcano, Helly; Gitau, Ernest TN; Hockert, John; Miller, Erin; Wylie, Joann

2013-09-25T23:59:59.000Z

264

Development of homogeneous mobile robots for box-pushing problem  

Science Journals Connector (OSTI)

This paper describes the development of a pair of homogeneous mobile robot using AT89C51 microcontroller with two 6V DC motors to address the box-pushing problem. In this work, two homogeneous mobile robots have been fully developed exclusively to address the box-pushing application that is described as ''Pushing a box-like solid item to reach the goal position already defined by more than one mobile robot through the cooperation among them''. Teaching the mobile robots using reinforcement learning is easier, because of specifying a reward function for every task completed by them.

C. Paramasivam; T. Sornakumar

2009-01-01T23:59:59.000Z

265

2.4 I Branches of Functions 79 2.4 BRANCHES OF FUNCTIONS  

E-Print Network [OSTI]

square root function is f1 (z) = |z| 1 2 ei Arg(z) 2 = r 1 2 ei 2 = r 1 2 cos 2 + ir 1 2 sin 2 , (2-28) where r = |z| and = Arg (z) so that - f1 is a branch of f. Using the same notation = r 1 2 ei 2 ei = -r 1 2 ei 2 = -f1 (z) , #12;2.4 I Branches of Functions 81 so f1 and f2 can

California at Santa Cruz, University of

266

Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility Granite Creek Hot Spring Sector Geothermal energy Type Pool and Spa Location Teton County, Wyoming Coordinates 43.853632°, -110.6314491° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

267

EA-1957: Cabin Creek Biomass Facility, Place County, CA | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Cabin Creek Biomass Facility, Place County, CA 7: Cabin Creek Biomass Facility, Place County, CA EA-1957: Cabin Creek Biomass Facility, Place County, CA SUMMARY DOE is proposing to provide funding to Placer County, California to construct and operate a two-megawatt wood-to-energy biomass facility at the Eastern Regional Materials Recovery Facility (MRF) and Landfill in unincorporated Placer County. The wood-to-energy biomass facility would use a gasification technology. The fuel supply for the proposed project would be solely woody biomass, derived from a variety of sources including hazardous fuels residuals, forest thinning and harvest residuals, and Wildland Urban Interface sourced waste materials from residential and commercial property defensible space clearing and property management activities

268

Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina  

SciTech Connect (OSTI)

In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents the results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.

Specht, W.L.

1991-10-01T23:59:59.000Z

269

Furnace Creek Ranch Pool & Spa Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Furnace Creek Ranch Pool & Spa Low Temperature Geothermal Facility Furnace Creek Ranch Pool & Spa Low Temperature Geothermal Facility Facility Furnace Creek Ranch Sector Geothermal energy Type Pool and Spa Location Death Valley, California Coordinates Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

270

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 2000: Johnson Creek Chinook Salmon Supplementation, Biennial Report 2000-2002.  

SciTech Connect (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon trapping, broodstock selection, and spawning was first implemented in 1998, did not occur in 1999, and was resumed in 2000. A total of 152 salmon were trapped in Johnson Creek in 2000, of which 73 (25 males, 16 females, and 32 jacks) fish were transported to Idaho Fish and Game=s South Fork Salmon River adult holding and spawning facility for artificial propagation purposes. The remaining 79 (29 males, 16 females, and 24 jacks) fish were released above the weir to spawn naturally. A total of 65,060 green eggs were taken from 16 female salmon and transported to the McCall Fish Hatchery for incubation and rearing. Egg counts indicated an average eye-up rate of 86.0% for 55,971 eyed eggs. Average fecundity for Johnson Creek females was 4,066 eggs per female. Juvenile fish were reared indoors at the McCall Fish Hatchery through November 2001. These fish were transferred to outdoor rearing facilities in December 2001 where they remained until release in March 2002. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags. In addition 9,987 were also PIT tagged. Hand counts provided by marking crews were used to amend the number of juvenile salmon released from the original egg count. A total of 57,392 smolts were released into a temporary acclimation channel in Johnson Creek on March 18, 19, 20, 2002. These fish were held in this facility until a fish screen was removed on March 22, 2002 and the fish were allowed to emigrate.

Daniel, Mitch; Gebhards, John; Hill, Robert

2003-05-01T23:59:59.000Z

271

Boiling Water at Hot Creek--The Dangerous and Dynamic Thermal Springs in California's Long Valley Caldera  

E-Print Network [OSTI]

Boiling Water at Hot Creek--The Dangerous and Dynamic Thermal Springs in California's Long Valley.S. Geological Survey USGS Fact Sheet 2007-3045 2007 T Hot Creek flows through the Long Valley Caldera Airport Fish hatchery CH-10B 44-16 Well Well Long Valley C aldera Area of Map Californ i a The thermal

Torgersen, Christian

272

The prehistory of the Little Pin Oak Creek Site (41FY53), Fayette County, Texas  

E-Print Network [OSTI]

-H. Scallorn points; I. Unidentified Style A. 213 46 Ceramics from Little Pin Oak Creek: A. Sherd HC13-A, Leon Plain; B. Sherd HC13-B, Leon Plain; C. Sherd HF11, Leon Plain. 219 47 Organic Artifacts from Little Pin Oak Creek: A. Bone button; B-C. Shell... this period (Frison 1978). PaleoIndian cultures tend to be extremely widespread; the Clovis culture appears to extend throughout the North American continent, while Folsom is limited to the Great Plains region, which stretches from Canada down into South...

Largent, Floyd Brisco

2012-06-07T23:59:59.000Z

273

Depth-gradient analysis of the Colony Creek Cycle (late Pennsylvanian) of north Texas  

E-Print Network [OSTI]

Creek Cycle in the Brazos River valley (Brad locality). . . . . . . . . . . . . . 31 2-9 Stratigraph1c section of the upper part of the Colony Creek Cycle in the Brazos River valley (North locality) . . . . . ~ . . ~ . ~ . . . . 32 5-2 Schematic...-1 Fusulinid Association (BRAD01). 5-2 Permophorus Association (LAKE09). 5-3 Linoproductus Association (PARK09). 5-4 Crurithyris Association (PARKOB). 5-5 Hemi zyga Association (NRTH09). 5-6 Nuculoid Association (NRTH01). 5-7 Ammonoid Association (PARK01...

Kennedy, Noel Lynne

2012-06-07T23:59:59.000Z

274

Branch content of metallocene polyethylene Ramnath Ramachandran, Gregory Beaucage*  

E-Print Network [OSTI]

Branch content of metallocene polyethylene Ramnath Ramachandran, Gregory Beaucage* and Amit catalyzed polyethylene (PE). A novel scaling approach is applied to determine the mole fraction branch solutions of metallocene polyethylene samples, to quantify the LCB content in polymers previously studied

Beaucage, Gregory

275

Hawaii Clean Water Branch Forms Webpage | Open Energy Information  

Open Energy Info (EERE)

Branch Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Clean Water Branch Forms Webpage Author State of Hawaii Department of...

276

Hawaii Department of Health Clean Air Branch Webpage | Open Energy...  

Open Energy Info (EERE)

Department of Health Clean Air Branch Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Department of Health Clean Air Branch Webpage...

277

TO :Lyall E. Johnson, Chief Licensing Branch  

Office of Legacy Management (LM)

Lyall E. Johnson, Chief Lyall E. Johnson, Chief Licensing Branch ,,,_ i-.. FROM :Clifford K. Beck, Chief q q+. ., ,,/,j !i-/ I, v' Hazards Evaluation Branch ,: s~~p:~LLItma0~7c ~HEI-IICAL wows We have reviewed the letter of December 10, 1958, from Mallinckrodt Chemical Works, requesting amendment of License No. SNM-33 to permit pelleting operations on uranium enriched to 5% U-235 in a new facility at Hematite, Missouri. Batch sizes throughout the operations will not exceed limited safe masses as specified in Report K-1019, Part 4 (Deleted). Neither the diameter nor capacity of the storage hopper located above the feed hopper of the pelleting press is given. Either the diameter should be not over the limited safe dimension or positive means should be in effect to insure against more than a limited safe m&s in the

278

Photovoltaic Program Branch annual report, FY 1989  

SciTech Connect (OSTI)

This report summarizes the progress of the Photovoltaic (PV) Program Branch of the Solar Energy Research Institute (SERI) from October 1, 1988, through September 30, 1989. The branch is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year (FY) 1989, this included nearly 50 subcontracts, with a total annualized funding of approximately $13.1 million. Approximately two-thirds of the subcontracts were with universities, at a total funding of nearly $4 million. The six technical sections of the report cover the main areas of the subcontracted program: Amorphous Silicon Research, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, New Ideas, and University Participation. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1989, and future research directions. Each report will be cataloged individually.

Summers, K A [ed.

1990-03-01T23:59:59.000Z

279

"Black Box" EMC model for Power Electronics Converter Mikael Foissac  

E-Print Network [OSTI]

"Black Box" EMC model for Power Electronics Converter Mikael Foissac Grenoble Electrical electronics, Electromagnetic compatibility, Reduced order systems, Parameter estimation. I. INTRODUCTION With the generalization of the "Power by Wire" concept, especially in aircraft and automotive applications, the electrical

Paris-Sud XI, Université de

280

Black-box reductions for cost-sharing mechanism design  

Science Journals Connector (OSTI)

We consider the design of strategyproof cost-sharing mechanisms. We give two simple, but extremely versatile, black-box reductions, that in combination reduce the cost-sharing mechanism-design problem to the algorithmic problem of ...

Konstantinos Georgiou; Chaitanya Swamy

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

P.O. Box 117, Oak Ridge, TN 37831  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Box 117, Oak Ridge, TN 37831 g (865) 241-8893 g IVsurveys@orau.org On the Web: www.orau.orgenvironmental-assessments-health-physics Oak Ridge Associated Universities (ORAU) is a...

282

Y-12s Moon Box ? a big hit in Texas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on the national television networks and to explain about the "Moon Box" made in Oak Ridge. He was proud of that, but he downplayed the trip when he shared the story with me. He...

283

What is paradoxical about the "Three-box paradox"?  

E-Print Network [OSTI]

This paper is a comment on quant-ph/0606067 by Ravon and Vaidman, in which they defend the position that the ``three-box paradox'' is indeed paradoxical.

J. Finkelstein

2006-06-26T23:59:59.000Z

284

Savings Project: Attic Stairs Cover Box | Department of Energy  

Energy Savers [EERE]

stairs provide an opportunity to improve comfort and save energy and money. You can air seal and insulate the attic stairs opening by building your own insulated cover box or...

285

Safety evaluation for packaging (onsite) depleted uranium waste boxes  

SciTech Connect (OSTI)

This safety evaluation for packaging (SEP) allows the one-time shipment of ten metal boxes and one wooden box containing depleted uranium material from the Fast Flux Test Facility to the burial grounds in the 200 West Area for disposal. This SEP provides the analyses and operational controls necessary to demonstrate that the shipment will be safe for the onsite worker and the public.

McCormick, W.A.

1997-08-27T23:59:59.000Z

286

On the power of non-local boxes  

E-Print Network [OSTI]

A non-local box is a virtual device that has the following property: given that Alice inputs a bit at her end of the device and that Bob does likewise, it produces two bits, one at Alice's end and one at Bob's end, such that the XOR of the outputs is equal to the AND of the inputs. This box, inspired from the CHSH inequality, was first proposed by Popescu and Rohrlich to examine the question: given that a maximally entangled pair of qubits is non-local, why is it not maximally non-local? We believe that understanding the power of this box will yield insight into the non-locality of quantum mechanics. It was shown recently by Cerf, Gisin, Massar and Popescu, that this imaginary device is able to simulate correlations from any measurement on a singlet state. Here, we show that the non-local box can in fact do much more: through the simulation of the magic square pseudo-telepathy game and the Mermin-GHZ pseudo-telepathy game, we show that the non-local box can simulate quantum correlations that no entangled pair of qubits can in a bipartite scenario and even in a multi-party scenario. Finally we show that a single non-local box cannot simulate all quantum correlations and propose a generalization for a multi-party non-local box. In particular, we show quantum correlations whose simulation requires an exponential amount of non-local boxes, in the number of maximally entangled qubit pairs.

A. Broadbent; A. A. Methot

2005-11-07T23:59:59.000Z

287

Nano-pore based characterization of branched polymers  

E-Print Network [OSTI]

We propose a novel characterization method of randomly branched polymers based on the geometrical property of such objects in confined spaces. The central idea is that randomly branched polymers exhibit passing/clogging transition across the nano-channel as a function of the channel size. This critical channel size depends on the degree of the branching, whereby allowing the extraction of the branching information of the molecule.

Takahiro Sakaue; Franoise Brochard-Wyart

2014-01-31T23:59:59.000Z

288

Atmospheric Mercury Concentrations Near Salmon Falls Creek Reservoir - Phase 1  

SciTech Connect (OSTI)

Elemental and reactive gaseous mercury (EGM/RGM) were measured in ambient air concentrations over a two-week period in July/August 2005 near Salmon Falls Creek Reservoir, a popular fishery located 50 km southwest of Twin Falls, Idaho. A fish consumption advisory for mercury was posted at the reservoir in 2002 by the Idaho Department of Health and Welfare. The air measurements were part of a multi-media (water, sediment, precipitation, air) study initiated by the Idaho Department of Environmental Quality and the U.S. Environmental Protection Agency (EPA) Region 10 to identify potential sources of mercury contamination to the reservoir. The sampling site is located about 150 km northeast of large gold mining operations in Nevada, which are known to emit large amounts of mercury to the atmosphere (est. 2,200 kg/y from EPA 2003 Toxic Release Inventory). The work was co-funded by the Idaho National Laboratorys Community Assistance Program and has a secondary objective to better understand mercury inputs to the environment near the INL, which lies approximately 230 km to the northeast. Sampling results showed that both EGM and RGM concentrations were significantly elevated (~ 30 70%, P<0.05) compared to known regional background concentrations. Elevated short-term RGM concentrations (the primary form that deposits) were likely due to atmospheric oxidation of high EGM concentrations, which suggests that EGM loading from upwind sources could increase Hg deposition in the area. Back-trajectory analyses indicated that elevated EGM and RGM occurred when air parcels came out of north-central and northeastern Nevada. One EGM peak occurred when the air parcels came out of northwestern Utah. Background concentrations occurred when the air was from upwind locations in Idaho (both northwest and northeast). Based on 2003 EPA Toxic Release Inventory data, it is likely that most of the observed peaks were from Nevada gold mine sources. Emissions from known large natural mercury sources in that area cannot account for the observed EGM peaks due to their diffuse source geometry and the large (170 km) transport distance involved. The EGM peak originating from northwestern Utah air may be from three known mercury sources west of Salt Lake City (Kennecott, US Magnesium, Clean Harbors Aragonite) and/or the 1600 MW coal-fired Intermountain Power plant near Delta. However, the relative importance of these short-term peaks for long-term watershed mercury loading (critical factor affecting fish concentrations) is not known, and there is a need to better quantify the annual frequency and magnitude of these different inputs over a longer period of time.

M. L. Abbott

2005-10-01T23:59:59.000Z

289

Dr. StrangeBox or : how I learned to stop worrying and love urban big box retail  

E-Print Network [OSTI]

Over the past decade, Big Box retailers have been trying to tap into urban markets after years of explicitly avoiding them in favor of suburban environments. In the past few years, retailers have begun experimenting with ...

Press, Jared Harding

2013-01-01T23:59:59.000Z

290

E-Print Network 3.0 - alternative energy branch Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

branch Search Powered by Explorit Topic List Advanced Search Sample search results for: alternative energy branch Page: << < 1 2 3 4 5 > >> 1 Thesis Overview: Reducing Branch...

291

The Glass Box offers a unique environment to support research, development and evaluation of software  

E-Print Network [OSTI]

The Glass Box offers a unique environment to support research, development and evaluation of software products used by workers performing real computer- based tasks. The Glass Box instrumentation and to retrieve, store, and share Glass Box data. · Test Bed environment­Glass Box serves as a test bed

292

Figure 1: ATA 42 antenna array at Hat Creek ********ADAPTIVE REAL TIME IMAGING FOR RADIO ASTRONOMY*******  

E-Print Network [OSTI]

Figure 1: ATA 42 antenna array at Hat Creek ********ADAPTIVE REAL TIME IMAGING FOR RADIO ASTRONOMY --------------------------­ · Astronomers primarily interested in astronomy. ­ Data reduction preoccupies radio astronomy specialists,f,p Bandpass( )f PolCal( )f,p Gains( )s,f,p S Beam Imager Astronomy Solver I2 ( ) )^(^, 2sVpfV - å ¹kj X Solver

Militzer, Burkhard

293

AN INVESTIGATION OF DEWATERING FOR THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO  

E-Print Network [OSTI]

c:es .B~l:JJ:. }eti. ',~, Colorado School of Mines, VoL 2'1,v Piceance Creek Basin v Colorado r and 9 p' 1974. Pc:u:~tBetween 'che White and Colorado Rivers, '! \\lo:ci:hwegt:ern

Mehran, M.

2013-01-01T23:59:59.000Z

294

OAK GROVE C OAL D EGAS CEDAR COVE COAL D EGAS BLU E CREEK COAL...  

Gasoline and Diesel Fuel Update (EIA)

OAK GROVE C OAL D EGAS CEDAR COVE COAL D EGAS BLU E CREEK COAL DEGAS BR OOKWOOD C OAL D EGAS ST AR ROBIN SONS BEND COAL D EGAS BLU FF COR INNE MOU NDVILLE COAL D EGAS BLU EGU T CR...

295

NAME: Old Place Creek Berm Removal Project LOCATION: Staten Island, Richmond County, New York  

E-Print Network [OSTI]

, particularly pesticides, and their removal from the system is an additional benefit of the project. In additionNAME: Old Place Creek Berm Removal Project LOCATION: Staten Island, Richmond County, New York ACRES Island, New York. Restoration will be accomplished through removal of an earthen berm, restoring

US Army Corps of Engineers

296

Site Formation Processes at the Buttermilk Creek Site (41BL1239), Bell County, Texas  

E-Print Network [OSTI]

August 2009 Major Subject: Anthropology iii ABSTRACT Site Formation Processes at the Buttermilk Creek Site (41BL1239), Bell County, Texas. (August 2009) Joshua Lake Keene, B.A., Eastern Washington University Chair of Advisory Committee: Dr... ................................................................................................................... 94 APPENDIX B ................................................................................................................. 105 APPENDIX C...

Keene, Joshua L.

2010-10-12T23:59:59.000Z

297

Restore McComas Meadows; Meadow Creek Watershed, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Meadow Creek watershed are coordinated and cost shared with the Nez Perce National Forest. The Nez Perce Tribe began watershed restoration projects within the Meadow Creek watershed of the South Fork Clearwater River in 1996. Progress has been made in restoring the watershed by excluding cattle from critical riparian areas through fencing, planting trees in riparian areas within the meadow and its tributaries, prioritizing culverts for replacement to accommodate fish passage, and decommissioning roads to reduce sediment input. During this contract period work was completed on two culvert replacement projects; Doe Creek and a tributary to Meadow Creek. Additionally construction was also completed for the ditch restoration project within McComas Meadows. Monitoring for project effectiveness and trends in watershed conditions was also completed. Road decommissioning monitoring, as well as stream temperature, sediment, and discharge were completed.

McRoberts, Heidi (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2006-07-01T23:59:59.000Z

298

Urban Influences on Stream Chemistry and Biology in the Big Brushy Creek Watershed, South Carolina  

E-Print Network [OSTI]

and rural sites. Discharge of wastewater treatment plant effluent at one rural location caused an increase land cover. wastewater treatment plant 1 Introduction The expansion of urban land areas affects between urban and rural sites may indicate that urban development in the Big Brushy Creek watershed has

299

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

300

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Seneca Creek Associates, LLC Wood Resources International, LLC "Illegal" Logging and Global Wood Markets  

E-Print Network [OSTI]

Seneca Creek Associates, LLC Wood Resources International, LLC SUMMARY "Illegal" Logging and Global Wood Markets: The Competitive Impacts on the U.S. Wood Products Industry Prepared for: American Forest Phone: 1-202-463-2713 Fax: 1-202- 463-4703 E-mail: agoetzl@sencreek.com Wood Resources International

302

Pataha Creek Model Watershed : January 2000-December 2002 Habitat Conservation Projects.  

SciTech Connect (OSTI)

The projects outlined in detail on the attached project reports were implemented from calendar year 2000 through 2002 in the Pataha Creek Watershed. The Pataha Creek Watershed was selected in 1993, along with the Tucannon and Asotin Creeks, as model watersheds by NPPC. In previous years, demonstration sites using riparian fencing, off site watering facilities, tree and shrub plantings and upland conservation practices were used for information and education and were the main focus of the implementation phase of the watershed plan. These practices were the main focus of the watershed plan to reduce the majority of the sediment entering the stream. Prior to 2000, several bank stabilization projects were installed but the installation costs became prohibitive and these types of projects were reduced in numbers over the following years. The years 2000 through 2002 were years where a focused effort was made to work on the upland conservation practices to reduce the sedimentation into Pataha Creek. Over 95% of the sediment entering the stream can be tied directly to the upland and riparian areas of the watershed. The Pataha Creek has steelhead in the upper reaches and native and planted rainbow trout in the mid to upper portion. Suckers, pikeminow and shiners inhabit the lower portion because of the higher water temperatures and lack of vegetation. The improvement of riparian habitat will improve habitat for the desired fish species. The lower portion of the Pataha Creek could eventually develop into spawning and rearing habitat for chinook salmon if some migration barriers are removed and habitat is restored. The upland projects completed during 2000 through 2002 were practices that reduce erosion from the cropland. Three-year continuous no-till projects were finishing up and the monitoring of this particular practice is ongoing. Its direct impact on soil erosion along with the economical aspects is being studied. Other practices such as terrace, waterway, sediment basin construction and the installation of strip systems are also taking place. The years 2000 through 2002 were productive years for the Pataha Creek Model Watershed but due to the fact that most of the cooperators in the watershed have reached their limitation allowed for no-till and direct seed/ two pass of 3 years with each practice, the cost share for these practices is lower than the years of the late 90's. All the upland practices that were implemented have helped to further reduce erosion from the cropland. This has resulted in a reduction of sedimentation into the spawning and rearing area of the fall chinook salmon located in the lower portion of the Tucannon River. The tree planting projects have helped in reducing sedimentation and have also improved the riparian zone of desired locations inside the Pataha Creek Watershed. The CREP (Conservation Reserve Enhancement Program) along with the CCRP (Continuous Conservation Reserve Program) are becoming more prevalent in the watershed and are protecting the riparian areas along the Pataha Creek at an increasing level every year. Currently roughly 197 acres of riparian has been enrolled along the Pataha Creek in the CREP program.

Bartels, Duane G.

2003-04-01T23:59:59.000Z

303

Branching and Momentum Effects in Photochemistry  

SciTech Connect (OSTI)

The decision on the fate of the reaction (branching of the path) is sometimes not only taken at the last conical intersection, but the Franck-Condon region can also contribute. Consideration of simple properties such as the slopes of the potential surfaces can explain effects such as the principle of least motion or the torquoselectivity without invoking ad-hoc electronic effects. The lack of stereospecificity of cyclobutene ring opening and the wavelength dependence of photochemical reactions of alkylated olefins and cyclobutenes can similarly be explained, if one assumes in addition that the momentum is conserved over a certain time.

Fuss, Werner [Max-Planck-Institut fuer Quantenoptik, D-85748 Garching (Germany)

2007-12-26T23:59:59.000Z

304

Annual report, Basic Sciences Branch, FY 1991  

SciTech Connect (OSTI)

This report summarizes the progress of the Basic Sciences Branch of the National Renewable Energy Laboratory (NREL) from October 1, 1990, through September 30, 1991. Seven technical sections of the report cover these main areas of NREL's in-house research: Semiconductor Crystal Growth, Amorphous Silicon Research, Polycrystalline Thin Films, III-V High-Efficiency Photovoltaic Cells, Solid-State Theory, Solid-State Spectroscopy, and Superconductivity. Each section explains the purpose and major accomplishments of the work in the context of the US Department of Energy's National Photovoltaic Research Program plans.

Not Available

1993-04-01T23:59:59.000Z

305

Annual report, Basic Sciences Branch, FY 1991  

SciTech Connect (OSTI)

This report summarizes the progress of the Basic Sciences Branch of the National Renewable Energy Laboratory (NREL) from October 1, 1990, through September 30, 1991. Seven technical sections of the report cover these main areas of NREL`s in-house research: Semiconductor Crystal Growth, Amorphous Silicon Research, Polycrystalline Thin Films, III-V High-Efficiency Photovoltaic Cells, Solid-State Theory, Solid-State Spectroscopy, and Superconductivity. Each section explains the purpose and major accomplishments of the work in the context of the US Department of Energy`s National Photovoltaic Research Program plans.

Not Available

1993-04-01T23:59:59.000Z

306

Integrated Box Interrogation System (IBIS) Preliminary Design Study  

SciTech Connect (OSTI)

Canberra Industries has won the tendered solicitation, INEEL/EST-99-00121 for boxed waste Nondestructive Assay Development and Demonstration. Canberra will provide the Integrated Box Interrogation System (IBIS) which is a suite of assay instrumentation and a data reduction system that addresses the measurement needs for Boxed Wastes identified in the solicitation and facilitates the associated experimental program and demonstration of system capability. The IBIS system will consist of the next generation CWAM system, i.e. CWAM II, which is a Scanning Passive/Active Neutron interrogation system which we will call a Box Segmented Neutron Scanner (BSNS), combined with a physically separate Box Segmented Gamma-ray Scanning (BSGS) system. These systems are based on existing hardware designs but will be tailored to the large sample size and enhanced to allow the program to evaluate the following measurement criteria:Characterization and correction for matrix heterogeneity Characterization of non-uniform radio-nuclide and isotopic compositions Assay of high density matrices (both high-Z and high moderator contents)Correction for radioactive material physical form - such as self shielding or multiplication effects due to large accumulations of radioactive materials.Calibration with a minimal set of reference standards and representative matrices.THis document summarizes the conceptual design parameters of the IBIS and indicates areas key to the success of the project where development is to be centered. The work presented here is a collaborative effort between scientific staff within Canberra and within the NIS-6 group at LANL.

DR. Stephen Croft; Mr. David Martancik; Dr. Brian Young; Dr. Patrick MJ Chard; Dr. Robert J Estop; Sheila Melton; Gaetano J. Arnone

2003-01-13T23:59:59.000Z

307

DOE/EA-1544: Environmental Assessment for the Proposed Anadarko/Veritas Salt Creek 3D Vibroseis Project (June 2005)  

Broader source: Energy.gov (indexed) [DOE]

___________________________ ___________________________ Salt Creek 3D Vibroseis Project Environmental Assessment BLM Casper Field Office June 2005 Page 1 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED ANADARKO / VERITAS SALT CREEK 3D VIBROSEIS PROJECT DOE EA No. EA-1544 BLM Case No. WYW-163071 BLM EA No. WY- 060-EA05-95 WOGCC Permit No. 025-05-015G _________________________________________________________________________________________________ Salt Creek 3D Vibroseis Project Environmental Assessment BLM Casper Field Office June 2005 Page 2 TABLE OF CONTENTS 1.0 PURPOSE AND NEED 1.1 Introduction 3 1.2 Purpose and need for action 3 1.3 Conformance with land use plan 3 1.4 Relationship to statutes, regulations, 4

308

A Tidal Hydrology Assessment for Reconnecting Spring Branch Creek to Suisun Marsh, Solano County CA: Predicting the Impact to the Federally Listed Plant Soft Bird's Beak  

E-Print Network [OSTI]

860,F18@@M15@NM811;EN28>,F18@@M396AE;10,8@@23=68F2860,F18@@M15@NM811;EN28>,F18@@M396AE;10,8@@23=68F2 B2DD21E22

Olson, Jessica J.

2011-01-01T23:59:59.000Z

309

Clean Cities: IdleBox Toolkit for Idle-Reduction Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IdleBox Toolkit for Idle-Reduction IdleBox Toolkit for Idle-Reduction Projects to someone by E-mail Share Clean Cities: IdleBox Toolkit for Idle-Reduction Projects on Facebook Tweet about Clean Cities: IdleBox Toolkit for Idle-Reduction Projects on Twitter Bookmark Clean Cities: IdleBox Toolkit for Idle-Reduction Projects on Google Bookmark Clean Cities: IdleBox Toolkit for Idle-Reduction Projects on Delicious Rank Clean Cities: IdleBox Toolkit for Idle-Reduction Projects on Digg Find More places to share Clean Cities: IdleBox Toolkit for Idle-Reduction Projects on AddThis.com... Coordinator Basics Outreach Logos, Graphics, & Photographs Print Products & Templates Exhibit Booths Presentations Videos QR Codes Tips Education & Webinars Meetings Reporting Contacts IdleBox Toolkit for Idle-Reduction Projects

310

The Branching of Graphs in 2-d Quantum Gravity  

E-Print Network [OSTI]

The branching ratio is calculated for three different models of 2d gravity, using dynamical planar phi-cubed graphs. These models are pure gravity, the D=-2 Gaussian model coupled to gravity and the single spin Ising model coupled to gravity. The ratio gives a measure of how branched the graphs dominating the partition function are. Hence it can be used to estimate the location of the branched polymer phase for the multiple Ising model coupled to 2d gravity.

M. G. Harris

1996-07-16T23:59:59.000Z

311

Basic Sciences Branch annual report, FY 1990  

SciTech Connect (OSTI)

This report summarizes the progress of the Basic Sciences Branch of the National Renewable Energy Laboratory (NREL) from October 1, 1989, through September 30, 1990. Six technical sections of the report cover these main areas of NREL`s in-house research: Semiconductor Crystal Growth, Amorphous Silicon Research, Polycrystalline Thin Films, III-V High-Efficiency Photovoltaic Cells, Solid-State Theory, and Solid-State Spectroscopy. Each section of the report was written by the group leader principally in charge of the work. The task in each case was to explain the purpose and major accomplishments of the work in the context of the US Department of Energy`s National Photovoltaic Research Program plans.

Not Available

1991-12-01T23:59:59.000Z

312

Hawaii Wastewater Branch Online Application Webpage | Open Energy...  

Open Energy Info (EERE)

Application Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Wastewater Branch Online Application Webpage Author State of Hawaii...

313

Determination of Charm Hadronic Branching Fractions at CLEO-c  

E-Print Network [OSTI]

Recent results from CLEO-c on measurements of absolute hadronic branching fractions of D0, D+, and Ds+ mesons are presented.

A. Ryd

2007-11-24T23:59:59.000Z

314

The Cane Creek clastic interval of the Pennsylvanian Paradox formation - an exciting new horizontal target; Part I: Regional Geology  

SciTech Connect (OSTI)

The Cane Creek is a fractured, abnormally pressured, self-sourcing reservoir, making it a good candidate for exploitation through horizontal technology. This concept was successfully applied to the Cane Creek in 1991 when Columbia Gas Development and Exxon Company USA, on an Enserch farmout, completed the Kane Springs Federal 27-1 for 914 BOPD. Since that time, two additional horizontal discoveries have potentialed for 1158 and 1325 BOPD, respectively. The Cane Creek was deposited in a partly restricted evaporitic environment in the Paradox basin during the Pennsylvanian. The Cane Creek consists of fifth-order shoaling-upward cycles within the transgressive to early highstand systems tracts. The reservoir comprises 20-30 ft of organic-rich, dolomitic siltstone and shale directly overlain and underlain by interbedded anhydrite, shale, and siltstone. In most areas, the Cane Creek is sealed above and below by halite, which maintains the abnormal pressure in the reservoir. Core information and reservoir engineering data indicate the Cane Creek produces from fracture porosity with minor contribution from the matrix. Initial fracture development may have occurred as a result of movement along basement-involved faults during the Pennsylvanian, followed by or coincident with salt mobilization from Pennsylvania-Jurassic. Hydrocarbon generation and overpressuring during maximum burial in the Late Cretaceous-early Tertiary created additional fractures or enhanced existing ones. The dominant fracture orientation is northeast-southwest to north-south, which is consistent with the regional stress regime during Late Cretaceous-early Tertiary.

Rawlins, D.M. (Exxon Company USA, Midland, TX (United States))

1993-08-01T23:59:59.000Z

315

Hot Creek Pool & Spa Low Temperature Geothermal Facility | Open Energy  

Open Energy Info (EERE)

Pool & Spa Low Temperature Geothermal Facility Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Creek Pool & Spa Low Temperature Geothermal Facility Facility Hot Creek Sector Geothermal energy Type Pool and Spa Location Mammoth Lakes Park Area, California Coordinates Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

316

Categorical Exclusion (CX) Determination Proposed Action: Expansion of O'Fallon Creek Substation Yard  

Broader source: Energy.gov (indexed) [DOE]

Expansion of O'Fallon Creek Substation Yard Expansion of O'Fallon Creek Substation Yard Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the current yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical Exclusions Being Applied: 10 CFR 10210410 Subpmi D, Appendix B, B4.11: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with the Regulatory Requirements for the National Environmental Policy Act at 10 CFR 1021AI0(b), require the following determinations be made in order for a proposed action to be categorically

317

Microsoft Word - CX-SpringCreek-WineCountry-TowerRelocationFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2012 November 29, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Justin Estes Project Manager - TELM-TPP-3 Proposed Action: Spring Creek - Wine County No. 1 Transmission Tower Relocation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Multnomah County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to relocate one transmission tower, located on private agricultural land, which has been damaged by farm equipment. Currently, tower 29/3 on BPA's Spring Creek - Wine Country No. 1 transmission line, resides on an agricultural access road that is bordered on both sides by active agricultural fields. This

318

Microsoft Word - Spring Creek Final Draft CX 7-15-2013.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Spring Creek Property funding Fish and Wildlife Project No. and Contract No.: 2002-003-00, BPA-007168 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management Location: Township 17 North, Range 20 West, Section 26, Lake County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund the Salish and Kootenai Tribes for the purchase of 10 acres of property, referred to as the Spring Creek Land Acqusition in Lake

319

Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.  

SciTech Connect (OSTI)

The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production

Hillson, Todd D. [Washington Department of Fish and Wildlife

2009-06-12T23:59:59.000Z

320

Furnace Creek Inn Pool & Spa Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Inn Pool & Spa Low Temperature Geothermal Facility Inn Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Furnace Creek Inn Pool & Spa Low Temperature Geothermal Facility Facility Furnace Creek Inn Sector Geothermal energy Type Pool and Spa Location Death Valley, California Coordinates Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

BioFuelBox Corporation | Open Energy Information  

Open Energy Info (EERE)

BioFuelBox Corporation BioFuelBox Corporation Jump to: navigation, search Logo: BioFuelBox Corporation Name BioFuelBox Corporation Address 50 Las Colinas Lane Place San Jose, California Zip 95119 Sector Biofuels Product Makes a modular container that produces biofuel cost-effectively Website http://www.biofuelbox.com/ Coordinates 37.237774°, -121.777361° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.237774,"lon":-121.777361,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

322

Campbell Creek TVA 2010 First Year Performance Report July 1, 2009 August 31, 2010  

SciTech Connect (OSTI)

This research project was initiated by TVA in March 2008 and encompasses three houses that are of similar size, design and located within the same community - Campbell Creek, Farragut TN with simulated occupancy. This report covers the performance period from July 1, 2009 to August 31, 2010. It is the intent of TVA that this Valley Data will inform electric utilities future residential retrofit incentive program.

Christian, Jeffrey E [ORNL; Gehl, Anthony C [ORNL; Boudreaux, Philip R [ORNL; New, Joshua Ryan [ORNL

2010-10-01T23:59:59.000Z

323

Environmental assessment for the Hoe Creek underground, Coal Gasification Test Site Remediation, Campbell County, Wyoming  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has prepared this EA to assess environmental and human health Issues and to determine potential impacts associated with the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming. The Hoe Creek site is located south-southwest of the town of Gillette, Wyoming, and encompasses 71 acres of public land under the stewardship of the Bureau of Land Management. The proposed action identified in the EA is for the DOE to perform air sparging with bioremediation at the Hoe Creek site to remove contaminants resulting from underground coal gasification (UCG) experiments performed there by the DOE in the late 1970s. The proposed action would involve drilling additional wells at two of the UCG test sites to apply oxygen or hydrogen peroxide to the subsurface to volatilize benzene dissolved in the groundwater and enhance bioremediation of non-aqueous phase liquids present in the subsurface. Other alternatives considered are site excavation to remove contaminants, continuation of the annual pump and treat actions that have been used at the site over the last ten years to limit contaminant migration, and the no action alternative. Issues examined in detail in the EA are air quality, geology, human health and safety, noise, soils, solid and hazardous waste, threatened and endangered species, vegetation, water resources, and wildlife. Details of mitigative measures that could be used to limit any detrimental effects resulting from the proposed action or any of the alternatives are discussed, and information on anticipated effects identified by other government agencies is provided.

NONE

1997-10-01T23:59:59.000Z

324

Correlation of stratigraphy with revegetation conditions at the Gibbons Creek Lignite Mine, Grimes County, Texas  

E-Print Network [OSTI]

. Correlation of Geochemistry with Environments of Deposition . Cross-Sections and Maps . GIBBONS CREEK LIGNITE MINE . 1 5 7', 7 8: 8 8 9'' 10 Location and Geologic Setting . Previous Studies 11, ' 13 High-wall Stability Hydrogeology... of each of these environments. As a result of her geologic study, she named the four lignite seams as 1, 2, 3 and 4 from oldest to youngest (Figure 5). This knowledge of the environment of deposition gave her a better understanding of the units...

Parisot, Laurence D.

1991-01-01T23:59:59.000Z

325

Operational restoration of the Pen Branch bottomland hardwood and swamp wetlands - the research setting  

SciTech Connect (OSTI)

The Savannah River Swamp is a 3020 Ha forested wetland on the floodplain of the Savannah River and is located on the Department of Energy's Savannah River Site (SRS) near Aiken, SC. Historically the swamp consisted of approximately 50 percent bald cypress-water tupelo stands, 40 percent mixed bottomland hardwood stands, and 10 percent shrub, marsh, and open water. Creek corridors were typical of Southeastern bottomland hardwood forests. The hydrology was controlled by flooding of the Savannah River and by flow from four creeks that drain into the swamp prior to flow into the Savannah River. Upstream dams have caused some alteration of the water levels and timing of flooding within the floodplain. Major impacts to the swamp hydrology occurred with the completion of the production reactors and one coal-fired powerhouse at the SRS in the early 1950's. Water was pumped from the Savannah River, through secondary heat exchangers of the reactors, and discharged into three of the tributary streams that flow into the swamp. Flow in one of the tributaries, Pen Branch, was typically 0.3 m3 s-1 (10-20) cfs prior to reactor pumping and 11.0 m3 s-1 (400 cfs) during pumping. This continued from 1954 to 1988 at various levels. The sustained increases in water volume resulted in overflow of the original stream banks and the creation of additional floodplains. Accompanying this was considerable erosion of the original stream corridor and deposition of a deep silt layer on the newly formed delta. Heated water was discharged directly into Pen Branch and water temperature in the stream often exceeded 65 degrees C. The nearly continuous flooding of the swamp, the thermal load of the water, and the heavy silting resulted in complete mortality of the original vegetation in large areas of the floodplain. In the years since pumping was reduced, early succession has begun in some affected areas. Most of this has been herbs, grasses, and shrubs. Areas that have seedlings are generally willow thickets that support a lower diversity of wildlife. No volunteer seedlings of heavy-seeded hardwoods or cypress have been found in the corridor areas. Research was conducted to determine methods to reintroduce tree species characteristic of more mature forested wetlands. Three restoration strategies were formulated to deal with the differing conditions of the Upper Corridor, the Lower Corridor, and the Delta regions of the impacted area. Site preparation and planting of each area with mixtures of tree species were carried out to speed the restoration of the ecosystem. Species composition and selection were altered based on the current and expected hydrological regimes that the reforestation areas will be experiencing. Because of the operational design of the restoration project, a research program naturally followed to document the success. Many of those efforts are detailed here.

Nelson, E.A.

2000-01-05T23:59:59.000Z

326

Oak Creek Wind Power Phase 2 Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Phase 2 Wind Farm Phase 2 Wind Farm Jump to: navigation, search Name Oak Creek Wind Power Phase 2 Wind Farm Facility Oak Creek Wind Power Phase 2 Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer M&N Wind Power/Oak Creek Energy Systems Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

327

Reservoir heterogeneity in Carter Sandstone, North Blowhorn Creek oil unit and vicinity, Black Warrior Basin, Alabama  

SciTech Connect (OSTI)

This report presents accomplishments made in completing Task 3 of this project which involves development of criteria for recognizing reservoir heterogeneity in the Black Warrior basin. The report focuses on characterization of the Upper Mississippian Carter sandstone reservoir in North Blowhorn Creek and adjacent oil units in Lamar County, Alabama. This oil unit has produced more than 60 percent of total oil extracted from the Black Warrior basin of Alabama. The Carter sandstone in North Blowhorn Creek oil unit is typical of the most productive Carter oil reservoirs in the Black Warrior basin of Alabama. The first part of the report synthesizes data derived from geophysical well logs and cores from North Blowhorn Creek oil unit to develop a depositional model for the Carter sandstone reservoir. The second part of the report describes the detrital and diagenetic character of Carter sandstone utilizing data from petrographic and scanning electron microscopes and the electron microprobe. The third part synthesizes porosity and pore-throat-size-distribution data determined by high-pressure mercury porosimetry and commercial core analyses with results of the sedimentologic and petrographic studies. The final section of the report discusses reservoir heterogeneity within the context of the five-fold classification of Moore and Kugler (1990).

Kugler, R.L.; Pashin, J.C.

1992-05-01T23:59:59.000Z

328

Hanford Workers Achieve Success in Difficult Glove Box Project at Plutonium  

Broader source: Energy.gov (indexed) [DOE]

Workers Achieve Success in Difficult Glove Box Project at Workers Achieve Success in Difficult Glove Box Project at Plutonium Finishing Plant Hanford Workers Achieve Success in Difficult Glove Box Project at Plutonium Finishing Plant June 26, 2013 - 12:00pm Addthis Team members gather for a photo after safely and successfully completing a complicated glove box separation. Team members gather for a photo after safely and successfully completing a complicated glove box separation. Workers separate highly contaminated glove boxes from their connection points in Hanford’s Plutonium Finishing Plant. Workers separate highly contaminated glove boxes from their connection points in Hanford's Plutonium Finishing Plant. Workers pull a glove box apart and encase each section in a protective covering to prevent exposure.

329

E-Print Network 3.0 - arc box test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

box test Search Powered by Explorit Topic List Advanced Search Sample search results for: arc box test Page: << < 1 2 3 4 5 > >> 1 Fat arcs for implicitly defined curves Szilvia...

330

APPLYING CACHING TO TWO-LEVEL ADAPTIVE BRANCH PREDICTION  

E-Print Network [OSTI]

" of Sibiu Hatfield, Hertfordshire, U.K. Seoul, Korea Sibiu-2400, Romania AL10 9AB 139-743 email: C% [1]. More recently, the advent of superscalar processors has given renewed impetus to branch on a superscalar processor. This renewed interest in branch prediction led to a dramatic breakthrough in the 1990s

Vintan, Lucian N.

331

HIDDEN SYMMETRIES OF CYCLIC BRANCHED COVERINGS OF 2-BRIDGE KNOTS  

E-Print Network [OSTI]

HIDDEN SYMMETRIES OF CYCLIC BRANCHED COVERINGS OF 2-BRIDGE KNOTS MARCO RENI AND ANDREI VESNIN hyperbolic 3-manifolds Mn(K), which are n- fold cyclic branched coverings of 2-bridge knots K. We show the symmetry groups of knots and links (see [BZ], [Ka]). Particularly, the class of 2-bridge knots

332

Surviving particles for subcritical branching processes in random environment  

E-Print Network [OSTI]

Surviving particles for subcritical branching processes in random environment Vincent Bansaye December 9, 2008 Abstract The asymptotic behavior of a subcritical Branching Process in Random Envi- ronment (BPRE) starting with several particles depends on whether the BPRE is strongly subcritical (SS

Paris-Sud XI, Université de

333

Branch length distribution in TREF fractionated polyethylene Ramnath Ramachandran a  

E-Print Network [OSTI]

Branch length distribution in TREF fractionated polyethylene Ramnath Ramachandran a , Gregory Keywords: Polyethylene Branching Neutron scattering a b s t r a c t Commercial polyethylene is typically and catalyst activity. Further, processing of polyethylene after polymerization may also result in changes

Beaucage, Gregory

334

BBuulllleettiinnFEBRUARY 2009 HARBOR BRANCH FORMS OCEAN EXPLORATION  

E-Print Network [OSTI]

is interested in mapping large swaths of sea floor in deep water. Harbor Branch will support this mission for the following reasons: · to provide detailed data on the distribu- tion of deep water reefs in order to protect with project management services, and our ship the RV Seward Johnson. At the same time Harbor Branch's Center

Fernandez, Eduardo

335

Radiolabeled dimethyl branched long chain fatty acid for heart imaging  

DOE Patents [OSTI]

A radiolabeled long chain fatty acid for heart imaging that has dimethyl branching at one of the carbons of the chain which inhibits the extent to which oxidation can occur. The closer to the carboxyl the branching is positioned, the more limited the oxidation, thereby resulting in prolonged retention of the radiolabeled compound in the heart.

Knapp, Jr., Furn F. (Oak Ridge, TN); Goodman, Mark M. (Knoxville, TN); Kirsch, Gilbert (Woippy, FR)

1988-08-16T23:59:59.000Z

336

Extension Bulletin E-1844 (New) August 1985 Forcing Flowering Branches  

E-Print Network [OSTI]

. Lee Taylor Department of Horticulture Introduction Cutting branches from your favorite flowering in a dimly lighted location at 60-65°F. Although branches could be brought into full sun and room of Horticulture August 1985 2 pages The PDF file was provided courtesy of the Michigan State University Library

337

Power-Aware Branch Prediction: Characterization and Design  

E-Print Network [OSTI]

Power-Aware Branch Prediction: Characterization and Design Dharmesh Parikh, Kevin Skadron, Yan-point benchmarks to explore the role of branch predictor organization in power/energy/performance tradeoffs's total power dissipation, prediction accuracy is nevertheless a powerful lever on processor behavior

Skadron, Kevin

338

Concentrations of Triclosan in the City of Denton Wastewater Treatment Plant, Pecan Creek, and the Influent and Effluent of an Experimental Constructed Wetland.  

E-Print Network [OSTI]

??The Pecan Creek Waste Reclamation Plant in Denton, Texas, an activated sludge WWTP, was sampled monthly for ten months to determine seasonal and site variation (more)

Waltman, Elise Lyn

2004-01-01T23:59:59.000Z

339

Depositional and diagenetic controls on reservoir quality and their petrophysical predictors within the Upper Cretaceous (Cenomanian) Doe Creek Member of the Kaskapau Formation at Valhalla Field, Northwest Alberta.  

E-Print Network [OSTI]

??Valhalla Field, discovered in 1979 and located in northwest Alberta, produces from the Upper Cretaceous Doe Creek Member of the Kaskapau Formation. Original reserves in (more)

Ball, Nathaniel H.

2009-01-01T23:59:59.000Z

340

Controlling a Steel Mill with BOXES Michael McGarity, Claude Sammut and David Clements  

E-Print Network [OSTI]

Controlling a Steel Mill with BOXES Michael McGarity, Claude Sammut and David Clements and Chambers (1968) to a large-scale, real-world problem, namely, learning to control a steel mill. By applying BOXES to a model of a skinpass mill (a type of steel mill), we find that the BOXES algorithm can be made

Sammut, Claude

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Autodesk MapGuide: There Is No Box Presenter: Jason Birch City of Nanaimo  

E-Print Network [OSTI]

Autodesk MapGuide®: There Is No Box Presenter: Jason Birch ­ City of Nanaimo Assistants: Andrew "think outside the box" to get your job done. Autodesk MapGuide Enterprise 2007 has blown the box wide portal at http://earth.nanaimo.ca/ jason.birch@nanaimo.ca More AU 2006 class information at www.autodesk

Ahmad, Sajjad

342

PO Box 6050, Irvine, CA 92616-6050 www.extension.uci.edu Accounting Courses  

E-Print Network [OSTI]

PO Box 6050, Irvine, CA 92616-6050 www.extension.uci.edu Accounting Courses (Not a Certificate Program) #12;PO Box 6050, Irvine, CA 92616-6050 www.extension.uci.edu LIST OF COURSES Course # Accounting://learn.uci.edu for more information on how the online courses work. Revised 9/27/12 #12;PO Box 6050, Irvine, CA 92616

Barrett, Jeffrey A.

343

Quantification of branching in model 3-arm star polyethylene Ramnath Ramachandran, Gregory Beaucage*  

E-Print Network [OSTI]

1 Quantification of branching in model 3-arm star polyethylene Ramnath Ramachandran, Gregory-arm star polyethylene molecules is presented. Many commercial polyethylenes have long side branches-density polyethylene (LDPE) is typically a highly branched structure with broad distributions in branch content, branch

Beaucage, Gregory

344

Environment/Health/Safety/Security (EHSS): Tool Box Safety Topics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tool Box Safety Topics Tool Box Safety Topics A Review of Haz com standards A Single Second Accident Prevention Acetone Use and Care Aerial Work Platforms Afterthoughts and Regrets Alcohol & the Job Allergies, Antihistamines Appreciating the Hazards, Oxyacetylene Attitude and Behavior Avoid Common Office Injuries Avoiding Electrical Shocks Back Care Back Injury Prevention Backing into Trouble Basic Machine Safety Battery Charging Hazards Be Cautious with Sulfuric Acid Be Prepared for Emergencies Bench & Pedestal Grinders Blood Borne Pathogens Carbon Monoxide Care for Half-Mask Respirators Carelessness Cargo Dock Safety CDT's-How you prevent them Chocking and Blocking Cold Medication.Drowsiness Cold Weather Hazards for Propane Powered Vehicles Come-a-Longs, Hoists & Chains Common Sense & Accidents

345

Box Elder County, Utah: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Box Elder County, Utah: Energy Resources Box Elder County, Utah: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.5380087°, -113.1918021° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.5380087,"lon":-113.1918021,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

346

Box Canyon Motel Space Heating Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Motel Space Heating Low Temperature Geothermal Facility Motel Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Box Canyon Motel Space Heating Low Temperature Geothermal Facility Facility Box Canyon Motel Sector Geothermal energy Type Space Heating Location Ouray, Colorado Coordinates 38.0227716°, -107.6714487° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

347

Box Butte County, Nebraska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Box Butte County, Nebraska: Energy Resources Box Butte County, Nebraska: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.1911471°, -103.0817903° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.1911471,"lon":-103.0817903,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

348

Black Box Approach for Energy Monitoring of Commercial Buildings  

E-Print Network [OSTI]

Page 1 of paper submitted to ICEBO 2008 Berlin Black Box Approach for Energy Monitoring of Commercial Buildings Susanne Komhard M.Sc. student Fraunhofer-Institute for Solar Energy Systems Freiburg, Germany Christian Neumann Project... leader Fraunhofer-Institute for Solar Energy Systems Freiburg, Germany ABSTRACT The potential to save energy by changing operational parameters - especially in existing commercial buildings ? is in the magnitude of 5-30%. In order to realize...

Komhard, S.; Neumann, C.

349

Multiple-state quantum Otto engine, 1D box system  

SciTech Connect (OSTI)

Quantum heat engines produce work using quantum matter as their working substance. We studied adiabatic and isochoric processes and defined the general force according to quantum system. The processes and general force are used to evaluate a quantum Otto engine based on multiple-state of one dimensional box system and calculate the efficiency. As a result, the efficiency depends on the ratio of initial and final width of system under adiabatic processes.

Latifah, E., E-mail: enylatifah@um.ac.id [Laboratory of Theoretical Physics and Natural Philosophy, Physics Department, Institut Teknologi Sepuluh Nopember, ITS, Surabaya, Indonesia and Physics Department, Malang State University (Indonesia); Purwanto, A. [Laboratory of Theoretical Physics and Natural Philosophy, Physics Department, Institut Teknologi Sepuluh Nopember, ITS, Surabaya (Indonesia)

2014-03-24T23:59:59.000Z

350

Problem definition Branch-and-Price approach Pricing: knapsack problem with conflicts Results A Branch-and-Price Algorithm for the Bin  

E-Print Network [OSTI]

Problem definition Branch-and-Price approach Pricing: knapsack problem with conflicts Results A Branch-and-Price Algorithm for the Bin Packing Problem with Conflicts Ruslan Sadykov1 François Vanderbeck Sadykov, François Vanderbeck Branch-and-price for bin packing with conflicts #12;Problem definition Branch-and-Price

Vanderbeck, François

351

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

352

Characterization of DOE reference oil shales: Mahogany Zone, Parachute Creek Member, Green River Formation Oil Shale, and Clegg Creek Member, New Albany Shale  

SciTech Connect (OSTI)

Measurements have been made on the chemical and physical properties of two oil shales designated as reference oil shales by the Department of Energy. One oil shale is a Green River Formation, Parachute Creek Member, Mahogany Zone Colorado oil shale from the Exxon Colony mine and the other is a Clegg Creek Member, New Albany shale from Kentucky. Material balance Fischer assays, carbon aromaticities, thermal properties, and bulk mineralogic properties have been determined for the oil shales. Kerogen concentrates were prepared from both shales. The measured properties of the reference shales are comparable to results obtained from previous studies on similar shales. The western reference shale has a low carbon aromaticity, high Fischer assay conversion to oil, and a dominant carbonate mineralogy. The eastern reference shale has a high carbon aromaticity, low Fischer assay conversion to oil, and a dominant silicate mineralogy. Chemical and physical properties, including ASTM distillations, have been determined for shale oils produced from the reference shales. The distillation data were used in conjunction with API correlations to calculate a large number of shale oil properties that are required for computer models such as ASPEN. There was poor agreement between measured and calculated molecular weights for the total shale oil produced from each shale. However, measured and calculated molecular weights agreed reasonably well for true boiling point distillate fractions in the temperature range of 204 to 399/sup 0/C (400 to 750/sup 0/F). Similarly, measured and calculated viscosities of the total shale oils were in disagreement, whereas good agreement was obtained on distillate fractions for a boiling range up to 315/sup 0/C (600/sup 0/F). Thermal and dielectric properties were determined for the shales and shale oils. The dielectric properties of the reference shales and shale oils decreased with increasing frequency of the applied frequency. 42 refs., 34 figs., 24 tabs.

Miknis, F. P.; Robertson, R. E.

1987-09-01T23:59:59.000Z

353

DOE/EIS-0265-SA-168: Supplement Analysis for the Watershed Management Program EIS - Protect and Restore Lolo Creek Watershed - Jim Brown Creek Streambank Stabilization (08/10/04)  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-168) Sabrina Keen Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Protect and Restore Lolo Creek Watershed - Jim Brown Creek Streambank Stabilization Project No: 1996-077-02 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection using Bioengineering Methods Location: Clearwater County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribe Description of the Proposed Action: The Bonneville Power Administration, Nez Perce Tribe, and Potlatch Corporation are proposing to stabilize streambanks along Jim Brown Creek near

354

V-189: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users Deny  

Broader source: Energy.gov (indexed) [DOE]

9: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users 9: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users Deny Service on the Target Host V-189: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users Deny Service on the Target Host July 1, 2013 - 12:48am Addthis PROBLEM: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users Deny Service on the Target Host PLATFORM: VirtualBox 4.2.12 ABSTRACT: A vulnerability was reported in Oracle VirtualBox. REFERENCE LINKS: VirtualBox ticket: 11863 SecurityTracker Alert ID: 1028712 IMPACT ASSESSMENT: Medium DISCUSSION: A local user on the guest operating system can issue a 'tracepath' command to cause the network on the target host system to become unavailable. IMPACT: A local user on a guest operating system can cause denial of service conditions on the target host system.

355

Sediment and radionuclide transport in rivers: radionuclide transport modeling for Cattaraugus and Buttermilk Creeks, New York  

SciTech Connect (OSTI)

SERATRA, a transient, two-dimensional (laterally-averaged) computer model of sediment-contaminant transport in rivers, satisfactorily resolved the distribution of sediment and radionuclide concentrations in the Cattaraugus Creek stream system in New York. By modeling the physical processes of advection, diffusion, erosion, deposition, and bed armoring, SERATRA routed three sediment size fractions, including cohesive soils, to simulate three dynamic flow events. In conjunction with the sediment transport, SERATRA computed radionuclide levels in dissolved, suspended sediment, and bed sediment forms for four radionuclides (/sup 137/Cs, /sup 90/Sr, /sup 239/ /sup 240/Pu, and /sup 3/H). By accounting for time-dependent sediment-radionuclide interaction in the water column and bed, SERATA is a physically explicit model of radionuclide fate and migration. Sediment and radionuclide concentrations calculated by SERATA in the Cattaraugus Creek stream system are in reasonable agreement with measured values. SERATRA is in the field performance phase of an extensive testing program designed to establish the utility of the model as a site assessment tool. The model handles not only radionuclides but other contaminants such as pesticides, heavy metals and other toxic chemicals. Now that the model has been applied to four field sites, including the latest study of the Cattaraugus Creek stream system, it is recommended that a final model be validated through comparison of predicted results with field data from a carefully controlled tracer test at a field site. It is also recommended that a detailed laboratory flume be tested to study cohesive sediment transport, deposition, and erosion characteristics. The lack of current understanding of these characteristics is one of the weakest areas hindering the accurate assessment of the migration of radionuclides sorbed by fine sediments of silt and clay.

Onishi, Y.; Yabusaki, S.B.; Kincaid, C.T.; Skaggs, R.L.; Walters, W.H.

1982-12-01T23:59:59.000Z

356

EA-1895: Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho  

Broader source: Energy.gov [DOE]

DOEs Bonneville Power Administration is preparing this EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River steelhead and collect spring Chinook salmon adults to support ongoing supplementation programs in the watershed. The Bureau of Land Management, a cooperating agency, preliminarily determined Lolo Creek to be suitable for Congressional designation into the Wild and Scenic River System. The EA includes a Wild and Scenic River Section 7 analysis.

357

Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 5  

SciTech Connect (OSTI)

This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities there). It addresses the quality assurance objectives for measuring the data, presents selected historical data, contains data from several discrete water characterization studies, provides data supporting the sediment characterization, and contains data related to several biota characterization studies.

NONE

1996-03-01T23:59:59.000Z

358

Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

NONE

1996-04-01T23:59:59.000Z

359

Overview of GRI research at the Rock Creek Site, Black Warrior Basin. Overview of GRI research at Rock Creek: Eight years of cooperative research, coalbed methane shortcourse. Held in Abingdon, Virginia on October 23, 1992. Topical report  

SciTech Connect (OSTI)

The presentation slides from the October 23, 1992 workshop on coalbed methane exploration and production are assembled in this volume. They illustrate the following discussions: Overview of GRI Research at Rock Creek: Eight Years of Cooperative Research, Drilling and Completing Coalbed Methane Wells: Techniques for Fragile Formations, Connecting the Wellborne to the Formation: Perforations vs. Slotting, Coalbed Methane Well Testing in the Warrior Basin, Reservoir Engineering: A Case Study at Rock Creek, Fraccing of Multiple Thin Seams: Considerations and Constraints, Implementing Coal Seam Stimulations: Requirements for Successful Treatments, Coal-Fluid Interactions, Mine-Through Observations of Coal Seam Stimulations: Reality vs. Theory, and Recompleting Coalbed Methane Wells: The Second Try at Success.

Schraufnagel, R.

1992-10-01T23:59:59.000Z

360

Near Critical Catalyst Reactant Branching Processes with Controlled Immigration  

E-Print Network [OSTI]

Near critical catalyst-reactant branching processes with controlled immigration are studied. The reactant population evolves according to a branching process whose branching rate is proportional to the total mass of the catalyst. The bulk catalyst evolution is that of a classical continuous time branching process; in addition there is a specific form of immigration. Immigration takes place exactly when the catalyst population falls below a certain threshold, in which case the population is instantaneously replenished to the threshold. Such models are motivated by problems in chemical kinetics where one wants to keep the level of a catalyst above a certain threshold in order to maintain a desired level of reaction activity. A diffusion limit theorem for the scaled processes is presented, in which the catalyst limit is described through a reflected diffusion, while the reactant limit is a diffusion with coefficients that are functions of both the reactant and the catalyst. Stochastic averaging principles under ...

Budhiraja, Amarjit

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Measurement of the Topological Branching Fractions of the ? Lepton  

E-Print Network [OSTI]

We report new and precise measurements of the decay branching fractions of the ? lepton to one and three charged particles. The data, corresponding to an integrated luminosity of 176 pb(?1), were collected by the high ...

Baringer, Philip S.

1985-08-05T23:59:59.000Z

362

Establishment report: Reforestation of the Pen Branch corridor and delta  

SciTech Connect (OSTI)

This report documents the role of the USDA Forest Service in the reforestation of the Pen Branch floodplain and delta. The report focuses upon the reforestation activities and monitoring to characterize the sites.

Nelson, E.A.; Dulohery, N.J.; Bunton, C.S.; Trettin, C.C.; McKee, W.H. Jr.

1995-12-01T23:59:59.000Z

363

Strong Branching Inequalities for Convex Mixed Integer Nonlinear ...  

E-Print Network [OSTI]

Sep 3, 2011 ... the branch-and-bound tree for solving Mixed Integer Nonlinear ..... A complete proof of Lemma 1 can be found in the Ph.D. thesis of K?l?n [24].

2011-09-03T23:59:59.000Z

364

Electrical resistance of the low dimensional critical branching random walk  

E-Print Network [OSTI]

We show that the electrical resistance between the origin and generation n of the incipient infinite oriented branching random walk in dimensions d0. This answers a question of Barlow, J\\'arai, Kumagai and Slade [2].

Antal A. Jrai; Asaf Nachmias

2013-05-06T23:59:59.000Z

365

E-Print Network 3.0 - advanced branching control Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

control... caused by hard-to-predict branch mispredictions, by collapsing multiple control flow paths and scheduling... - tion of the branch guarding predicate. Depending on...

366

Improvement of Anadromous Fish Habitat and Passage in Omak Creek, 2008 Annual Report : February 1, 2008 to January 31, 2009.  

SciTech Connect (OSTI)

During the 2008 season, projects completed under BPA project 2000-100-00 included installation of riparian fencing, maintenance of existing riparian fencing, monitoring of at-risk culverts and installation of riparian vegetation along impacted sections of Omak Creek. Redd and snorkel surveys were conducted in Omak Creek to determine steelhead production. Canopy closure surveys were conducted to monitor riparian vegetation recovery after exclusion of cattle since 2000 from a study area commonly known as the Moomaw property. Additional redd and fry surveys were conducted above Mission Falls and in the lower portion of Stapaloop Creek to try and determine whether there has been successful passage at Mission Falls. Monitoring adult steelhead trying to navigate the falls resulted in the discovery of shallow pool depth at an upper pool that is preventing many fish from successfully navigating the entire falls. The Omak Creek Habitat and Passage Project has worked with NRCS to obtain additional funds to implement projects in 2009 that will address passage at Mission Falls, culvert replacement, as well as additional riparian planting. The Omak Creek Technical Advisory Group (TAG) is currently revising the Omak Creek Watershed Assessment. In addition, the group is revising strategy to focus efforts in targeted areas to provide a greater positive impact within the watershed. In 2008 the NRCS Riparian Technical Team was supposed to assess areas within the watershed that have unique problems and require special treatments to successfully resolve the issues involved. The technical team will be scheduled for 2009 to assist the TAG in developing strategies for these special areas.

Dasher, Rhonda; Fisher, Christopher [Colville Confederated Tribes

2009-06-09T23:59:59.000Z

367

Reproductive success and mortality rates of Ceriodaphnia dubia maintained in water from Upper Three Runs, Pen Branch, and Fourmile Branch  

SciTech Connect (OSTI)

It is anticipated that the new SRS NPDES permit will require toxicity testing of at numerous outfalls and receiving streams, using the standard test species, Ceriodaphnia dubia. Because SRS surface waters differ markedly from the standard culture water that is used for Ceriodaphnia, studies were undertaken to determine if unimpacted SRS surface waters will support this species. Three SRS surface waters were evaluated; Upper Three Runs at Road 8-1, Pen Branch at Road B, and Fourmile Branch at Road F. Toxicity tests were performed monthly on each water source for eleven months. All three water sources exhibited varying degrees of toxicity to Ceriodaphnia, with Pen Branch being the least toxic and Fourmile Branch being the most toxic. These results indicate that if in-stream toxicity testing is required, it may not be possible to separate the naturally occurring toxic effects of the receiving water from possible toxic effects of SRS effluents.

Specht, W.L.

1994-12-01T23:59:59.000Z

368

The Unique Branching Patterns of Deinococcus Glycogen Branching Enzymes Are Determined by Their N-Terminal Domains  

Science Journals Connector (OSTI)

...9005-79-2 Glycogen 9005-82-7 Amylose 9037-22-3 Amylopectin EC 2.4.1.18 1,4-alpha-Glucan Branching Enzyme...metabolism Amino Acid Sequence Amylopectin metabolism Amylose Bacterial Proteins genetics...

M. Palomo; S. Kralj; M. J. E. C. van der Maarel; L. Dijkhuizen

2009-01-09T23:59:59.000Z

369

Using EPR To Compare PEG-branch-nitroxide "Bivalent-Brush Polymers" and Traditional PEG Bottle-Brush Polymers: Branching  

E-Print Network [OSTI]

Using EPR To Compare PEG-branch-nitroxide "Bivalent-Brush Polymers" and Traditional PEG Bottle and a hydrophobic nitroxide domain. Electron paramagnetic resonance (EPR) spectroscopy was used to characterize

Turro, Nicholas J.

370

Antidepressants' Black-Box Warning 10 Years Later  

Science Journals Connector (OSTI)

...adolescents, 1.4 million young adults, and 5 million older adults researchers examined automated health care claims data (for 2000 to 2010) derived from 11 health plans in the U.S. Mental Health Research Network. The study revealed significant reductions in antidepressant use within 2 years after... In 2004, the FDA issued a black-box warning linking antidepressants to an increased risk of suicidal thinking, feeling, and behavior in young people. But some worrisome trends suggest that the warning may inadvertently discourage appropriate treatment of depression.

Friedman R.A.

2014-10-30T23:59:59.000Z

371

An experimental investigation of a general quadrilateral torsion box  

E-Print Network [OSTI]

'10497 FC ~2 0. 1359 FC At point (46, 17) (Gage $4) o' = 0. 63127 F 2 ? -0. 3209 F At point (26, 21) (Gage $5) 0 = 0. 41414 F 1 ' C 0 2 0'20800 FC To determine the theoretical direction of the principal stresses, the bisector of angle PZQ (Fig. 1... OF FIGURES Figure Page 1. Plan View of Top Panel. Torsion-Box Loading Schematic Strain Gage Orientation 13 Load-Stress Curve Comparison, Gages 2 and 6 22 Load-Stress Curve, Gage 7. Load-Stress Curve, Gage 8. Load-Stress Curve, Gage 9. 28 29 Load...

Champlin, James Lund

2012-06-07T23:59:59.000Z

372

B I OENV I RONMENTAL FEATURES OF THE OGOTORUK CREEK AREA, CAPE THOMPSON, ALASKA  

Office of Legacy Management (LM)

B I OENV I RONMENTAL FEATURES B I OENV I RONMENTAL FEATURES OF THE OGOTORUK CREEK AREA, CAPE THOMPSON, ALASKA A First Summary by The Committee on Environmental Studies for Project Chariot . . December 1960 r Division of Biology and Medicine, AEC Washington, D. C. IT U S WEGWS LIBIA3"b This page intentionally left blank NUCLEAR EXPLOSIONS -PEACE UL APPLICATIONS . . BIOLOGY AND MEDICINE BIOENVIRONMENTAL FEATURES OF THE OGOTORUK CREEK AREA . . CAPE THOMPSON, ALASKA A F i r s t Sumnary The C o d t t e e on E n v i r o n m e n t a l S t u d i e s for P r o j e c t C h a r i o t PLllWSHARE PROGRAM THE UNITED STATES ATOMIC ENERGY COMMISSION December, 1 9 6 0 MAP OF ALASKA - CHARIOT LOCATION SCALE IN MILES . 111*1.1) , FOREWORD . . This summary is based on the reports on more than 30 bioenvironmental investigations carried out' in the Cape Thompson area in Alaska since

373

Camas Creek (Meyers Cove) Anadromous Species Habitat Improvement: Annual Report 1989.  

SciTech Connect (OSTI)

Historical agricultural practices and natural events contributed to severe degradation of riparian zones and instream fish habitat in the Meyers Cove area of Camas Creek. In 1984, Salmon National Forest personnel began implementing specific management activities in riparian areas and the stream channel to accelerate habitat recovery. In 1987--88, 4.3 miles of fence was constructed establishing a riparian livestock exclosure in the Meyers Cove area of Camas Creek. One end-gap and two water-crossing corridors were constructed in 1989 to complete the fence system. The riparian exclosure has been fertilized with phosphorous-rich fertilizer to promote root growth. A stream crossing ford was stabilized with angular cobble. Streambank stabilization/habitat cover work was completed at three sites and three additional habitat structures were placed. Extensive habitat inventories were completed to identify quality/quantity of habitat available to anadromous fish. The work accomplished was designed to promote natural revegetation of the riparian area to improve rearing habitat cover and streambank stability. Streambank work was limited to extremely unstable sites. Enhancement activities will improve spawning, incubation, and rearing habitat for wild populations of steelhead trout and chinook salmon. Anadromous species population increases resulting from these enhancement activities will provide partial compensation for downstream losses resulting from hydroelectric developments on the Columbia River system. 9 refs., 6 figs., 7 tabs.

Hardy, Terry

1989-12-01T23:59:59.000Z

374

Deposition and diagenesis of a cratonic Silurian platform reef, Pipe Creek Jr. , Indiana  

SciTech Connect (OSTI)

Petrographic and geochemical characteristics of the Pipe Creek Jr. paragenesis record the stratigraphic and burial evolution of the cratonic Silurian platform of Indiana during Late Silurian to Pennsylvanian. A variety of several diagenetic fluids acting over geological time affected the reef. The paragenetic sequence is as follows: (1) precipitation of turbid, fibrous, blotchy cathodoluminescent (CL) cement; (2) dolomitization of mud-rich facies; (3) precipitation of clear, zoned CL equant calcite cements; (4) fracturing and karst formation, partially filled by geopetal silt and sandstone; (5) precipitation of clear, dull CL, ferroan to nonferroan equant calcite cement, ferroan dolomite overgrowth and equant dolomite cement in moldic porosity, caves and fractures; (6) microdissolution and hydrocarbon emplacement; and (7) stylolitization. The New Albany Shale was both the hydrocarbon source and top seal to the fossil Pipe Creek Jr. oil field with original oil in place estimated at 11 million bbl. The level of organic metamorphism of the New Albany Shale, the oil residue, and the two-phase fluid inclusions in the burial cements suggest that sediments accumulated on the platform throughout Mississippian time.

Simo, A.; Lehmann, P.

1988-02-01T23:59:59.000Z

375

Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking  

Broader source: Energy.gov (indexed) [DOE]

Satellite Television Industry Meeting Regarding DOE Set-Top Box Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking On April 3, 2012 at 11:00 AM, representatives of the U.S. satellite television industry, listed below, met with the DOE officials, listed below, at the Forestall Building to discuss matters of concern to the U.S. satellite television industry regarding the pending DOE rulemaking to establish energy conservation standards on set-top boxes (STBs) under title Ill of the Energy Policy and Conservation Act of 1974, as amended. Memo_Ex_Parte_Comm.pdf More Documents & Publications DOE's Proposed Coverage Determination for Set-Top Boxes Ex Parte Memorandum on Set Top Boxes and Network Equipment Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52

376

Terminal Box Airflow Reset: An Effective Operation and Control Strategy for Comfort Improvement and Energy Conservation  

E-Print Network [OSTI]

terminal boxes, the maximum potential zone load during unoccupied hours must be considered. The airflow reset may be implemented using the terminal box controller only. However, central control systems may have to be used for most of the existing... control systems. One method is to develop two control schedules (occupied and unoccupied). Based on the time, the central control system automatically switch between two schedules. (downloads the un-occupied schedule to the terminal box controller...

Liu, M.; Abbas, M.; Zhu, Y.; Claridge, D. E.

2002-01-01T23:59:59.000Z

377

Diffusion coefficients in trimethyleneoxide containing comb branch polymer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Diffusion coefficients in trimethyleneoxide containing comb branch polymer Diffusion coefficients in trimethyleneoxide containing comb branch polymer electrolytes Title Diffusion coefficients in trimethyleneoxide containing comb branch polymer electrolytes Publication Type Journal Article Year of Publication 2004 Authors Liu, Gao, Craig L. Reeder, Xiaoguang Sun, and John B. Kerr Journal Solid State Ionics Volume 175 Pagination 781-783 Keywords comb branch polyethers, conductivity, lithium battery, polymer electrolytes, salt diffusion coefficient, trimethylene oxide Abstract This paper reports on a new comb branch polymer based on trimethylene oxide (TMO) side chains as a polymer electrolyte for potential application in lithium metal rechargeable batteries. The trimethylene oxide (TMO) units are attached to the side chains of a polyepoxide ether to maximize the segmental motion. Lithium bis(trifluoromethylsulfonyl)imide (LiTFSI) salt was used to formulate the polymer electrolyte with the new TMO containing polymers. The new polymer electrolytes show improved salt diffusion coefficients (Ds) and conductivity at ambient and subambient temperature compare to the ethylene oxide (EO) counterpart, whereas performance at high temperature (85 °C) remains the same or is actually worse for salt diffusivity.

378

ARCHAEOLOGY, LATE-QUATERNARY LANDSCAPE EVOLUTION, AND ENVIRONMENTAL CHANGE IN THE UPPER DRIFTWOOD CREEK BASIN, BARBER COUNTY, KANSAS  

E-Print Network [OSTI]

and D) . 26 Donovan Ranch Fan. 33 Blunk Ranch Location.. 37 Sterling Ranch Section.. 48 VI. CONCLUSIONS 53 Paleo... of the study area within the upper Driftwood Creek basin 2 3. Location of archaeological sites discussed in the text.. 12 4. Location of the Vincent-Donovan site and the Donovan Ranch Fan ... 29 5. Terrace remnant and soil...

Kessler, Nicholas Victor

2010-12-09T23:59:59.000Z

379

The area of North King County was once forested with deep woods and braided with creeks, where wild-  

E-Print Network [OSTI]

The area of North King County was once forested with deep woods and braided with creeks, where wild distinct identities, of the historic communities of North King County. www.ci.woodinville.wa.us www and a jumping-off point for the Burke-Gilman trail. Tracy Owen was a King county council mem- ber from 1969

Yetisgen-Yildiz, Meliha

380

Biological monitoring of Upper Three Runs Creek, Savannah River Site, Aiken County, South Carolina, March 1990--July 1991  

SciTech Connect (OSTI)

In anticipation of the fall 1988 start up of effluent discharges into Upper Three Runs Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F/H area effluent on the creek, the study included qualitative and quantitative macroinvertebrate stream surveys at five sites (see map), chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. In a March 1990 study of the potential impact of F/H Area effluent on the macroinvertebrate communities of Upper Three Runs Creek was extended, with reductions in the number of sites to be sampled and in the frequency of water chemistry sampling. This report presents the results of macroinvertebrate stream surveys at three sites, chronic toxicity testing of the effluent and water chemistry analysis of the three stream sites and the effluent from March 1990 to July 1991.

Not Available

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Analysis of soil and water at the Four Mile Creek seepline near the F- and H-Areas of SRS  

SciTech Connect (OSTI)

Several soil and water samples were collected along the Four Mile Creek (FMC) seepline at the F and H Areas of the Savannah River Site. The samples were analyzed for concentrations of metals, radionuclides, and inorganic constituents. The results of the analyses are summarized for the soil and water samples.

Haselow, J.S.

2000-05-24T23:59:59.000Z

382

Benchmarking and Equipment and Controls Assessment for a 'Big Box' Retail Chain  

E-Print Network [OSTI]

Assessment for a Big Box Retail Chain Philip Haves andperformance of existing and new retail stores belonging to aenergy performance of retail stores of relatively standard

Haves, Philip

2008-01-01T23:59:59.000Z

383

C-340 ST-90 Boxes Solid Waste Management Unit (SWMU) Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

40 ST-90 Boxes Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 568 DATE OF ORIGINAL SAR: 112210 DATE OF SAR REVISIONS: NA REGULATORY STATUS: SWMU LOCATION:...

384

E-Print Network 3.0 - automobile black boxes Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: automobile black boxes Page: << < 1 2 3 4 5 > >> 1 Detecting Automobiles and People for...

385

Black-Box Test Case Generation from TFM Module Interface Specications and Usage Statistics.  

E-Print Network [OSTI]

??In this thesis, we propose a black-box testing method that derives important test cases by including usage statistics, and enables a product manager to make (more)

Iwata, Katsuya

2012-01-01T23:59:59.000Z

386

Hawaii Department of Health Indoor and Radiological Health Branch | Open  

Open Energy Info (EERE)

Indoor and Radiological Health Branch Indoor and Radiological Health Branch Jump to: navigation, search Name Hawaii Department of Health Indoor and Radiological Health Branch From Open Energy Information Address 591 Ala Moana Blvd. Place Honolulu, Hawaii Zip 96813 Website http://hawaii.gov/health/envir Coordinates 21.300314°, -157.864542° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.300314,"lon":-157.864542,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

387

Memorandum A. J. Rizzo, Chief TO : Operational Safety Branch  

Office of Legacy Management (LM)

j Memorandum A. J. Rizzo, Chief TO / : Operational Safety Branch Harold Glauberman, ?a FROM : Operational Safety Branch ' I DATE: September 30, 1966 REMOVAL OF CONTAMINATED EQUlPMEHT AT THE CANEL FACILITY SUBJECT: MI DDLETOWN, CONNECT I CUT' INTRODUCTION The decision to terminate AEC contract activities at the CANEL facility introduced the need to dispose of radioactively contaminated equipment and materials so as to permit release of the facilities. As a result, -' . the Operational Safety Branch, NY, was requested to perform thenecessary Health Physics surveillance and monitoring functions during the-disassembly, removal and packaging of the contaminated equipment. The actual removal and handling of contaminated equipment was performed by the' AEC.contractor,

388

Hawaii Department of Health Safe Drinking Water Branch | Open Energy  

Open Energy Info (EERE)

Branch Branch Jump to: navigation, search Name Hawaii Department of Health Safe Drinking Water Branch Address 919 Ala Moana Blvd Room 308 Place Honolulu, Hawaii Zip 96814 Coordinates 21.294755°, -157.858979° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.294755,"lon":-157.858979,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

389

North Branch Municipal Water and Light - Residential Energy Efficiency  

Broader source: Energy.gov (indexed) [DOE]

North Branch Municipal Water and Light - Residential Energy North Branch Municipal Water and Light - Residential Energy Efficiency Rebate Program North Branch Municipal Water and Light - Residential Energy Efficiency Rebate Program < Back Eligibility Commercial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount Lighting: See program website Room A/C: $25, plus $25 for recycling an old, working unit Central A/C: $100 - $200, plus additional rebate for efficiency ratings above 14.5 SEER Air Source Heat Pump:$100 - $200, plus additional rebate for efficiency ratings above 14.5 SEER Geothermal Heat Pump:$200/ton, plus $25/ton for every 1 EER above minimum

390

Why is an IEEE Student Branch Beneficial? A Student Branch gives students the opportunity to meet and learn from fellow students, as well as faculty members and  

E-Print Network [OSTI]

://www.ieee.org/web/membership/qualifications/qualifications.html. IEEE Student Branches are established at over 1,500 universities and colleges throughout the world rebates and allotments to help Student Branches with operating costs based on their timely submission.00 per member rebate. Upon submission of their Annual Plan, Branches receive $50.00 if they have less

Eckmiller, Rolf

391

White Oak Creek watershed: Melton Valley area Remedial Investigation report, at the Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 2, Appendixes A and B  

SciTech Connect (OSTI)

This document contains Appendixes A ``Source Inventory Information for the Subbasins Evaluated for the White Oak Creek Watershed`` and B ``Human Health Risk Assessment for White Oak Creek / Melton Valley Area`` for the remedial investigation report for the White Oak Creek Watershed and Melton Valley Area. Appendix A identifies the waste types and contaminants for each subbasin in addition to the disposal methods. Appendix B identifies potential human health risks and hazards that may result from contaminants present in the different media within Oak Ridge National Laboratory sites.

NONE

1996-11-01T23:59:59.000Z

392

DOEIJEA-1219 ENVIRONMENTAL ASSESSMENT HOE CREEK UNDERGROUND COAL GASIFICATION TEST SITE REMEDIATION  

Broader source: Energy.gov (indexed) [DOE]

DOEIJEA-1219 DOEIJEA-1219 ENVIRONMENTAL ASSESSMENT HOE CREEK UNDERGROUND COAL GASIFICATION TEST SITE REMEDIATION CAMPBELL COUNTY, WYOMING October 1997 U.S. DEPARTMENT OF ENERGY FEDERAL ENERGY TECHNOLOGY CENTER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process. or service by trade name, trademark, manufac-

393

Microsoft Word - CX_PerryCreek_4.29.11.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife and Parks for purchase of the Perry Creek Property. Fish and Wildlife Project No.: 2008-800-00, Contract 45235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 24 North, Range 17 West, Section 31, Lake County, Montana

394

Microsoft Word - 2012_Rapid_Lightening_Creek_Easement_CX_Rev2.doc  

Broader source: Energy.gov (indexed) [DOE]

24, 2012 24, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Virgil Lee Watts Project Manager - KEWM-4 Proposed Action: AMENDED Provision of funds to the Idaho Department of Fish and Game (IDFG) to purchase the Rapid Lightning Creek Property. Fish and Wildlife Project No.: 1992-061-00 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management. Location: Township 58 North, Range 1 West, Section 24 of Bonner County, Idaho Proposed by: Bonneville Power Administration (BPA) and IDFG Description of the Proposed Action: BPA proposes to provide funds to IDFG for a fee-simple title acquisition of an approximately 27-acre parcel of land adjacent to the Rapid Lightning and

395

Microsoft Word - CX-HillsCreek-LookoutPointWoodPolesFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Hills Creek-Lookout Point No. 1 wood pole replacements PP&A Project No.: 2315 (WO# 297311) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA), Alvey District Description of the Proposed Action: BPA proposes to replace four deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchors) along the subject transmission line. The poles are located on private residential and US Forest Service land. Landowners will be notified prior to replacement activities. Replacement will be in-

396

Supplying LNG markets using nitrogen rejection units at Exxon Shute Creek Facility  

SciTech Connect (OSTI)

Interest is growing in the United States for using Liquid Natural Gas (LNG) as an alternative transportation fuel for diesel and as a source of heating fuel. For gas producers, LNG offers a premium price opportunity versus conventional natural gas sales. To supply this developing market, two existing Nitrogen Rejection Units (NRU) at the Exxon Shute Creek Facility in Wyoming were modified allowing LNG extraction and truck loading for transport to customers. The modifications involved adding heat exchanger capacity to the NRUs to compensate for the refrigeration loss when LNG is removed. Besides allowing for LNG extraction, the modifications also debottlenecked the NRUs resulting in higher methane recovery and lower compression costs. With the modifications, the NRUs are capable of producing for sale 60,000 gpd (5 MMscfd gas equivalent) of high purity LNG. Total investment has been $5 million with initial sales of LNG occurring in September 1994.

Hanus, P.M.; Kimble, E.L. [Exxon Co. USA, Midland, TX (United States)

1995-11-01T23:59:59.000Z

397

Examination of eastern oil shale disposal problems - the Hope Creek field study  

SciTech Connect (OSTI)

A field-based study of problems associated with the disposal of processed Eastern oil shale was initiated in mid-1983 at a private research site in Montgomery County, Kentucky. The study (known as the Hope Creek Spent Oil Shale Disposal Project) is designed to provide information on the geotechnical, revegetation/reclamation, and leachate generation and composition characteristics of processed Kentucky oil shales. The study utilizes processed oil shale materials (retorted oil shale and reject raw oil shale fines) obtained from a pilot plant run of Kentucky oil shale using the travelling grate retort technology. Approximately 1000 tons of processed oil shale were returned to Kentucky for the purpose of the study. The study, composed of three components, is described. The effort to date has concentrated on site preparation and the construction and implementation of the field study research facilities. These endeavors are described and the project direction in the future years is defined.

Koppenaal, D.W.; Kruspe, R.R.; Robl, T.L.; Cisler, K.; Allen, D.L.

1985-02-01T23:59:59.000Z

398

Microsoft Word - JockoSpringCreek_Scott_Acquisition_CX_Final.doc  

Broader source: Energy.gov (indexed) [DOE]

purchase of Jocko Spring Creek Property. Fish and Wildlife Project No.: 2002-003-00, Contract # BPA-44646 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 17 North, Range 20 West, Section 26 of the Arlee Quad, in Lake County, Montana Proposed by: Bonneville Power Administration (BPA) and CSKT Description of the Proposed Action: BPA proposes to fund the acquisition of 126 acres of

399

Microsoft Word - CX-Rock_Creek-John_Day_No1_Spacer_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

9, 2010 9, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Rock Creek-John Day No. 1 500-kV transmission line; structures 1/1 to 4/2 and 6/4 to 11/2 Budget Information: Work Order #00234528 PP&A Project No.: PP&A 1167 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA)

400

Microsoft Word - CX-BB3-Dragoon-Creek_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

1, 2010 1, 2010 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Jason Moon - TELF-TPP-3 Project Manager Proposed Action: Provide heavy vehicular access across Dragoon Creek to maintain and service Bonneville Power Administration's (BPA) Bell-Boundary No.3 transmission line by replacing the existing wood stringer bridge with a precast or modular steel bridge. PP&A Project No.: PP&A 1574 Budget Information: 247745 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance/custodial services for buildings, structures, infrastructures (e.g., pathways, roads, and railroads), equipment. B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Energy and exergy efficiencies of a solar box-cooker  

Science Journals Connector (OSTI)

A simple and low-cost box-type solar cooker (SBC) was designed and tested. The energy and exergy efficiencies of the SBC were experimentally evaluated. The energy output of the SBC ranges from 2.1 to 61.7 kJ, whereas the exergy output ranges from 0.4 to 6.2 kJ during the same time interval. The average daily energy and exergy outputs of the SBC are 21.6 and 2.5 kJ, respectively. A linear regression is developed to find the relationships between the energy/exergy outputs, and the efficiencies and temperature difference. The energy efficiency of the SBC varies between 1.3 and 55.6%, while the exergy efficiency varies between 0.3 and 6% during the same period. The average daily energy and exergy efficiencies of the SBC are 18.3 and 2.2%, respectively.

H. Huseyin Ozturk

2004-01-01T23:59:59.000Z

402

Calculations of electronic states in ultrasmall quantum boxes of diamond  

Science Journals Connector (OSTI)

The electronic structure of ultrasmall quantum boxes (QBs) of diamond with (110) ( 1 1 0 ) and (001) planes saturated by hydrogen is calculated using the extended Hckel-type nonorthogonal tight-binding method. It is shown that in contrast to the QBs with the ideal surfaces which show a clear dependence of the lowest unoccupied molecular orbital (LUMO) energy on the size variation along the [001] direction the energy of the LUMO state in the QBs with a monohydrogenated dimer on the (001) surface depends little on the size variation in agreement with the experiment. It is found that the LUMO state in the latter is surfacelike in character and associated with backbonds of the surface dimers. It is also demonstrated that optical transitions across the energy gap exhibit significant oscillator strength.

Masahiko Nishida

2008-01-01T23:59:59.000Z

403

Structural characterization of terrestrial microbial Mn oxides from Pinal Creek, AZ  

SciTech Connect (OSTI)

The microbial catalysis of Mn(II) oxidation is believed to be a dominant source of abundant sorption- and redox-active Mn oxides in marine, freshwater, and subsurface aquatic environments. In spite of their importance, environmental oxides of known biogenic origin have generally not been characterized in detail from a structural perspective. Hyporheic zone Mn oxide grain coatings at Pinal Creek, Arizona, a metals-contaminated stream, have been identified as being dominantly microbial in origin and are well studied from bulk chemistry and contaminant hydrology perspectives. This site thus presents an excellent opportunity to study the structures of terrestrial microbial Mn oxides in detail. XRD and EXAFS measurements performed in this study indicate that the hydrated Pinal Creek Mn oxide grain coatings are layer-type Mn oxides with dominantly hexagonal or pseudo-hexagonal layer symmetry. XRD and TEM measurements suggest the oxides to be nanoparticulate plates with average dimensions on the order of 11 nm thick x 35 nm diameter, but with individual particles exhibiting thickness as small as a single layer and sheets as wide as 500 nm. The hydrated oxides exhibit a 10-A basal-plane spacing and turbostratic disorder. EXAFS analyses suggest the oxides contain layer Mn(IV) site vacancy defects, and layer Mn(III) is inferred to be present, as deduced from Jahn-Teller distortion of the local structure. The physical geometry and structural details of the coatings suggest formation within microbial biofilms. The biogenic Mnoxides are stable with respect to transformation into thermodynamically more stable phases over a time scale of at least 5 months. The nanoparticulate layered structural motif, also observed in pure culture laboratory studies, appears to be characteristic of biogenic Mn oxides and may explain the common occurrence of this mineral habit in soils and sediments.

Bargar, John; Fuller, Christopher; Marcus, Matthew A.; Brearley, Adrian J.; Perez De la Rosa, M.; Webb, Samuel M.; Caldwell, Wendel A.

2008-03-19T23:59:59.000Z

404

Combining the Box Structure Development Method and CSP for Software Development  

Science Journals Connector (OSTI)

In this paper, we combine the Box Structure Development Method (BSDM) [H.D. Mills, R.C. Linger, and A.R. Hevner. Principles of Information Systems Analysis and Design. Academic Press, 1986, S.J. Prowell, C.J. Trammell, R.C. Linger, and J.H. Poore. Cleanroom ... Keywords: Box Structure Development Method, CSP, FDR, Software design verification

Philippa J. Hopcroft; Guy H. Broadfoot

2005-05-01T23:59:59.000Z

405

EnergyBox: A Trace-driven Tool for Data Transmission Energy Consumption Studies  

E-Print Network [OSTI]

EnergyBox: A Trace-driven Tool for Data Transmission Energy Consumption Studies Ekhiotz Jon Vergara-awareness and propose EnergyBox, a tool that provides accurate and repeatable en- ergy consumption studies for 3G and WiFi transmissions at the user end. We recognize that the energy consumption of data transmission is highly

406

Regulating the ethylene response of a plant by modulation of F-box proteins  

SciTech Connect (OSTI)

The invention relates to transgenic plants having reduced sensitivity to ethylene as a result of having a recombinant nucleic acid encoding a F-box protein, and a method of producing a transgenic plant with reduced ethylene sensitivity by transforming the plant with a nucleic acid sequence encoding a F-box protein.

Guo, Hongwei (La Jolla, CA); Ecker, Joseph R. (Carlsbad, CA)

2010-02-02T23:59:59.000Z

407

Grey-box modeling of an ocean vessel for operational optimization  

Science Journals Connector (OSTI)

Operational optimization of ocean vessels, both off-line and in real-time, is becoming increasingly important due to rising fuel cost and added environmental constraints. Accurate and efficient simulation models are needed to achieve maximum energy efficiency. In this paper a grey-box modeling approach for the simulation of ocean vessels is presented. The modeling approach combines conventional analysis models based on physical principles (a white-box model) with a feed forward neural-network (a black-box model). Two different ways of combining these models are presented, in series and in parallel. The results of simulating several trips of a medium sized container vessel show that the grey-box modeling approach, both serial and parallel approaches, can improve the prediction of the vessel fuel consumption significantly compared to a white-box model. However, a prediction of the vessel speed is only improved slightly. Furthermore, the results give an indication of the potential advantages of grey-box models, which is extrapolation beyond a given training data set and the incorporation of physical phenomena which are not modeled in the white-box models. Finally, included is a discussion on how to enhance the predictability of the grey-box models as well as updating the neural-network in real-time.

Leifur . Leifsson; Hildur Svarsdttir; Sven . Sigursson; Ari Vsteinsson

2008-01-01T23:59:59.000Z

408

1Black Box Software Testing Copyright 2003 Cem Kaner The Role of Testers in XP  

E-Print Network [OSTI]

1Black Box Software Testing Copyright © 2003 Cem Kaner The Role of Testers in XP Cem Kaner August reflect the views of the National Science Foundation (NSF). #12;2Black Box Software Testing Copyright © 2003 Cem Kaner Testing: The Traditional View · Many years ago, the software development community

409

Power Grid Verification Using Node and Branch Nahi Abdul Ghani  

E-Print Network [OSTI]

Power Grid Verification Using Node and Branch Dominance Nahi Abdul Ghani ECE Department University Toronto, Ontario, Canada f.najm@utoronto.ca ABSTRACT The verification of power grids in modern integrated, Verification Keywords Power grid, voltage drop, dominance 1. INTRODUCTION The rising demand for low

Najm, Farid N.

410

Branching ratios for the beta decay of Na-21  

E-Print Network [OSTI]

We have measured the beta-decay branching ratio for the transition from Na-21 to the first excited state of Ne-21. A recently published test of the standard model, which was based on a measurement of the beta-nu correlation in the decay of Na-21...

Iacob, V. E.; Hardy, John C.; Gagliardi, Carl A.; Goodwin, J.; Nica, N.; Park, H. I.; Tabacaru, G.; Trache, L.; Tribble, Robert E.; Zhai, Y.; Towner, I. S.

2006-01-01T23:59:59.000Z

411

The Polymerase Chain Reaction and Branching Processes Fengzhu Sun  

E-Print Network [OSTI]

The Polymerase Chain Reaction and Branching Processes Fengzhu Sun Department of Mathematics, DRB is studied. We also study the distribution of the Hamming distance between two randomly chosen sequences long. The double-stranded DNA molecules are heated to near boiling temperature so that the double

Sun, Fengzhu - Sun, Fengzhu

412

Measurement of the B semileptonic branching fraction with lepton tags  

E-Print Network [OSTI]

We have used the CLEO II detector and 2.06 fb(-1) of Y(4S) data to measure the B-meson semileptonic branching fraction. The B --> Xe nu momentum spectrum was obtained over nearly the full momentum range by using charge and kinematic correlations...

Ammar, Raymond G.; Baringer, Philip S.; Bean, Alice; Besson, David Zeke; Coppage, Don; Copty, N.; Davis, Robin E. P.; Hancock, N.; Kotov, S.; Kravchenko, I.; Kwak, Nowhan

1996-03-01T23:59:59.000Z

413

,rsity or Calirorn:taBuue: SOUTHERN -BRANCH  

E-Print Network [OSTI]

. Astronomy, 117. Biology, 102. Board,96. Books, 97. Boeaiyl, 102. Calendar, 5. Chemistry, 108. Chemistry BRANCH LOS ANGELES , CALIFORNIA ForSaleattheStudents'BookStores. Berkeley and Los Angeles PRICE , 10 information about the University, its organization , government , requirements for admission to undergraduate

Grether, Gregory

414

Branching Brownian motion with an inhomogeneous breeding potential  

E-Print Network [OSTI]

Branching Brownian motion with an inhomogeneous breeding potential J. W. Harris and S. C. Harris 1TW, U.K. email: john.harris@bristol.ac.uk. Supported by the Heilbronn Institute for Mathe- matical.K. email: s.c.harris@bath.ac.uk 1 #12;|y|p for p > 2, the population would almost surely explode

Harris, Simon Colin

415

Measurement of Branching Ratio for K+?e+?  

Science Journals Connector (OSTI)

Using a 2?-sr magnetic spectrometer, the branching ratio for K+?e+? relative to that for K+??+? has been measured to be (2.42 0.42) 10-5, in good agreement with the predictions of the V-A theory.

A. R. Clark, Bruce Cork, T. Elioff, L. T. Kerth, J. F. McReynolds, David Newton, and W. A. Wenzel

1972-10-30T23:59:59.000Z

416

RUSSIAN ACADEMY OF SCIENCE Lenin Order of Siberian Branch  

E-Print Network [OSTI]

RUSSIAN ACADEMY OF SCIENCE Lenin Order of Siberian Branch G.I. Budker INSTITUTE OF NUCLEAR PHYSICS.I. Meshkov, V.V. Smaluk, V.N. Zhilich, A.N. Zhuravlev Budker Institute of Nuclear Physics 630090, Novosibirsk at the points with non-zero dispersion function Dx 0. Wiggler field variation enables us to redistribute

Smaluk, Victor

417

Cow Branch Wind Energy Center Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Cow Branch Wind Energy Center Wind Farm Cow Branch Wind Energy Center Wind Farm Jump to: navigation, search Name Cow Branch Wind Energy Center Wind Farm Facility Cow Branch Wind Energy Center Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wind Capital Group/John Deere Capital Developer Wind Capital Group/John Deere Capital Energy Purchaser Associated Electric Cooperative Location Atchison County MO Coordinates 40.423897°, -95.477781° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.423897,"lon":-95.477781,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

418

Lab Ahead of Schedule Processing Waste in Large Boxes | Department of  

Broader source: Energy.gov (indexed) [DOE]

Lab Ahead of Schedule Processing Waste in Large Boxes Lab Ahead of Schedule Processing Waste in Large Boxes Lab Ahead of Schedule Processing Waste in Large Boxes March 30, 2012 - 12:00pm Addthis A framework agreement between DOE and the State of New Mexico calls for the Lab’s TRU Waste Program to ship 3,706 cubic meters of combustible or dispersible transuranic waste to WIPP for permanent disposal by June 30, 2014. A framework agreement between DOE and the State of New Mexico calls for the Lab's TRU Waste Program to ship 3,706 cubic meters of combustible or dispersible transuranic waste to WIPP for permanent disposal by June 30, 2014. Processing waste in large boxes is ahead of schedule due to worker skill, efficient processing and good planning. Processing waste in large boxes is ahead of schedule due to worker skill,

419

Recovery Act Begins Box Remediation Operations at F Canyon | Department of  

Broader source: Energy.gov (indexed) [DOE]

Recovery Act Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon May 17, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Paivi Nettamo, SRNS (803) 646-6075 paivi.nettamo@srs.gov AIKEN, S.C. - The F Canyon box remediation program, an American Recovery and Reinvestment Act project at Savannah River Site (SRS), has come online to process legacy transuranic (TRU) waste for off-site shipment and permanent disposal at the Waste Isolation Pilot Plant (WIPP), a geological repository in New Mexico. The $40-million facility will process approximately 330 boxes containing TRU waste with a radiological risk higher than seen in the rest of the Site's original 5,000-cubic-meter

420

DOE/EA-1371; Integrated Natural Resources Management Plan, Environmental Assessment, and Finding of No Significant Impacts for Rock Creek Reserve (5/2001)  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact Integrated Natural Resources Management Plan and Environmental Assessment for Rock Creek Reserve Summary: The Department of Energy (DOE) with the assistance and cooperation of the US. Fish and Wildlife Service, prepared an Integrated Natural Resources Management Plan and Environmental Assessment (Plan)(DOE/EA-1371) for the Rock Creek Reserve at the Rocky Flats Environmental Technology Site (Site) located north of Golden, Colorado. The Rock Creek Reserve was established in May 1999 in recognition of the area's biological significance. Although still under the ownership of the DOE, the Rock Creek Reserve will be co- managed with the U. S. Fish and Wildlife Service as part of an interagency agreement signed by these two

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Notice of Availability of the Record of Decision for the Goodnoe Hills and White Creek Wind Energy Projects, Business Plan EIS (DOE/EIS-0183) (October 2005)  

Broader source: Energy.gov (indexed) [DOE]

13 Federal Register 13 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices DEPARTMENT OF ENERGY Bonneville Power Administration Goodnoe Hills and White Creek Wind Energy Projects, October 2005 AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: BPA has decided to offer contract terms for interconnection of the Goodnoe Hills and White Creek Wind Energy Projects into the Federal Columbia River Transmission System (FCRTS) at the Rock Creek substation in Klickitat County, Washington. The Large Generation Interconnection Agreement (LGIA) provides for interconnection of the Wind Projects with the FCRTS, the operation of Goodnoe Hills and White Creek Wind Energy Projects in the BPA Control Area

422

A Box-Cox Generalization of the Almost Ideal Demand System with a Special Emphasis on Motor Fuel Price Elasticities.  

E-Print Network [OSTI]

?? This paper uses a Box-Cox generalization of the Almost Ideal Demand System (AIDS). The AIDS model is nested within a framework utilizing Box-Cox transformations (more)

Meux, Eric

2012-01-01T23:59:59.000Z

423

Microsoft Word - CX-Alvey-FairviewAlvey-MartinCreek-DrainWoodPolesFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Wood pole replacements on the Alvey-Fairview No. 1 230-kV, Alvey- Wood pole replacements on the Alvey-Fairview No. 1 230-kV, Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV transmission line rights-of-way (ROW) PP&A Project No.: 2308 (WO# 297303), 2310 (WO# 297305), 2319 (WO# 297996) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Alvey and Douglas counties, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace 18 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) as well as cross arms on three other structures along the subject transmission lines. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger

424

Asotin Creek Instream Habitat Alteration Projects : Habitat Evaluation, Adult and Juvenile Habitat Utilization and Water Temperature Monitoring : 2001 Progress Report.  

SciTech Connect (OSTI)

Asotin Creek originates from a network of deeply incised streams on the slopes of the Blue Mountains of southeastern Washington. The watershed drains an area of 322 square miles that provides a mean annual flow of 74 cfs. The geomorphology of the watershed exerts a strong influence on biologic conditions for fish within the stream. Historic and contemporary land-use practices have had a profound impact on the kind, abundance, and distribution of anadromous salmonids in the watershed. Fish habitat in Asotin Creek and other local streams has been affected by agricultural development, grazing, tilling practices, logging, recreational activities and implementation of flood control structures (Neilson 1950). The Asotin Creek Model Watershed Master Plan was completed in 1994. The plan was developed by a landowner steering committee for the Asotin County Conservation District (ACCD), with technical support from various Federal, State and local entities. Actions identified within the plan to improve the Asotin Creek ecosystem fall into four main categories: (1) Stream and Riparian, (2) Forestland, (3) Rangeland, and (4) Cropland. Specific actions to be carried out within the stream and in the riparian area to improve fish habitat were: (1) create more pools, (2) increase the amount of large organic debris (LOD), (3) increase the riparian buffer zone through tree planting, and (4) increase fencing to limit livestock access. All of these actions, in combination with other activities identified in the Plan, are intended to stabilize the river channel, reduce sediment input, increase the amount of available fish habitat (adult and juvenile) and protect private property. Evaluation work described within this report was to document the success or failure of the program regarding the first two items listed (increasing pools and LOD). Beginning in 1996, the ACCD, with cooperation from local landowners and funding from Bonneville Power Administration began constructing instream projects to improve fish habitat. In 1998, the ACCD identified the need for a more detailed analysis of these instream projects to fully evaluate their effectiveness at improving fish habitat. Therefore, ACCD contracted with WDFW's Snake River Lab (SRL) to take pre- and post-construction measurements of the habitat (i.e., pools, LOD, width, depth) at each site, and to evaluate fish use within some of the altered sites. These results have been published annually as progress reports to the ACCD (Bumgarner et al. 1999, Wargo et al. 2000, and Bumgarner and Schuck 2001). The ACCD also contracted with the WDFW SRL to conduct other evaluation and monitoring in the stream such as: (1) conduct snorkel surveys at habitat alteration sites to document fish usage following construction, (2) deploy temperature monitors throughout the basin to document summer water temperatures, and (3) attempt to document adult fish utilization by documenting the number of steelhead redds associated with habitat altered areas. This report provides a summary of pre-construction measurements taken on three proposed Charley Creek habitat sites during 2001, two sites in main Asotin Creek, and one site in George Creek, a tributary that enters in the lower Asotin Creek basin. Further, it provides a comparison of measurements taken pre- and post-construction on three 1999 habitat sites taken two years later, but at similar river flows. It also presents data collected from snorkel surveys, redd counts, and temperature monitoring.

Bumgarner, Joseph D.

2002-01-01T23:59:59.000Z

425

DOE/EIS-0415: Final Environmental Impact Statement Deer Creek Station Energy Facility Project Brookings County, South Dakota (April 2010)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL IMPACT STATEMENT Deer Creek Station Energy Facility Project Brookings County, South Dakota U.S. Department of Energy Western Area Power Administration Upper Great Plains Region Billings, Montana DOE/EIS-0415 April 2010 Final Environmental Impact Statement Cover Sheet i COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agency: U.S. Department of Agriculture, Rural Utilities Service

426

Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document describes the organization, strategy, and procedures to be used to confirm that mercury concentrations in soils in the remediated areas are statistically less than, or equal to, the cleanup standard of 400 ppm. It focuses on confirming the cleanup of the stretch of the Lower East Fork Popular Creed flowing from Lake Reality at the Y-12 Plant, through the City of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation and its associated flood plain.

NONE

1996-12-01T23:59:59.000Z

427

Sediment and radionuclide transport in rivers. Phase 2. Field sampling program for Cattaraugus and Buttermilk Creeks, New York  

SciTech Connect (OSTI)

As part of a study on sediment and radionuclide transport in rivers, Pacific Northwest Laboratory (PNL) is investigating the effect of sediment on the transport of radionuclides in Cattaraugus and Buttermilk Creeks, New York. A source of radioactivity in these creeks is the Western New York Nuclear Service Center which consists of a low-level waste disposal site and a nuclear fuel reprocessing plant. Other sources of radioactivity include fallout from worldwide weapons testing and natural background radioactivity. The major objective of the PNL Field Sampling Program is to provide data on sediment and radionuclide characteristics in Cattaraugus and Buttermilk Creeks to verify the use of the Sediment and Radionuclide Transport model, SERATRA, for nontidal rivers. This report covers the results of field data collection conducted during September 1978. Radiological analysis of sand, silt, and clay size fractions of suspended and bed sediment, and water were performed. Results of these analyses indicate that the principal radionuclides occurring in these two water courses, with levels significantly higher than background levels, during the Phase 2 sampling program were Cesium-137 and Strontium-90. These radionuclides had significantly higher activity levels above background in the bed sediment, suspended sediment, and water samples. Other radionuclides that are possibly being released into the surface water environment by the Nuclear Fuel Services facilities are Plutonium-238, 239, and 240, Americium-241, Curium-244, and Tritium. More radionuclides were consistently found in the bed sediment as compared to suspended sediment. The fewest radionuclides were found in the water of Buttermilk and Cattaraugus Creeks. The higher levels were found in the bed sediments for the gamma-emitters and in the suspended sediment for the alpha and beta-emitters (not including Tritium).

Walters, W.H.; Ecker, R.M.; Onishi, Y.

1982-04-01T23:59:59.000Z

428

An Isopycnal Box Model with predictive deep-ocean structure for biogeochemical cycling applications  

Science Journals Connector (OSTI)

To simulate global ocean biogeochemical tracer budgets a model must accurately determine both the volume and surface origins of each water-mass. Water-mass volumes are dynamically linked to the ocean circulation in General Circulation Models, but at the cost of high computational load. In computationally efficient Box Models the water-mass volumes are simply prescribed and do not vary when the circulation transport rates or water mass densities are perturbed. A new computationally efficient Isopycnal Box Model is presented in which the sub-surface box volumes are internally calculated from the prescribed circulation using a diffusive conceptual model of the thermocline, in which upwelling of cold dense water is balanced by a downward diffusion of heat. The volumes of the sub-surface boxes are set so that the density stratification satisfies an assumed link between diapycnal diffusivity, ?d, and buoyancy frequency, N: ?d=c/(N?), where c and ? are user prescribed parameters. In contrast to conventional Box Models, the volumes of the sub-surface ocean boxes in the Isopycnal Box Model are dynamically linked to circulation, and automatically respond to circulation perturbations. This dynamical link allows an important facet of ocean biogeochemical cycling to be simulated in a highly computationally efficient model framework.

Philip Goodwin

2012-01-01T23:59:59.000Z

429

Regulating the ethylene response of a plant by modulation of F-box proteins  

SciTech Connect (OSTI)

The relationship between F-box proteins and proteins invovled in the ethylene response in plants is described. In particular, F-box proteins may bind to proteins involved in the ethylene response and target them for degradation by the ubiquitin/proteasome pathway. The transcription factor EIN3 is a key transcription factor mediating ethylne-regulated gene expression and morphological responses. EIN3 is degraded through a ubiquitin/proteasome pathway mediated by F-box proteins EBF1 and EBF2. The link between F-box proteins and the ethylene response is a key step in modulating or regulating the response of a plant to ethylene. Described herein are transgenic plants having an altered sensitivity to ethylene, and methods for making transgenic plant haing an althered sensitivity to ethylene by modulating the level of activity of F-box proteins. Methods of altering the ethylene response in a plant by modulating the activity or expression of an F-box protein are described. Also described are methods of identifying compounds that modulate the ethylene response in plants by modulating the level of F-box protein expression or activity.

Guo, Hongwei [Beijing, CN; Ecker, Joseph R [Carlsbad, CA

2014-01-07T23:59:59.000Z

430

Corrosion Evaluation of Tank 40 Leak Detection Box  

SciTech Connect (OSTI)

'Leak detection from the transfer lines in the tank farm has been a concern for many years because of the need to minimize exposure of personnel and contamination of the environment. The leak detection box (LDB) is one line of defense, which must be maintained to meet this objective. The evaluation of a failed LDB was one item from an action plan aimed at minimizing the degradation of LDBs. The Tank 40 LDB, which failed in service, was dug up and shipped to SRTC for evaluation. During a video inspection while in service, this LDB was found to have black tubercles on the interior, which suggested possible microbial involvement. The failure point, however, was believed to have occurred in the drain line from the transfer line jacket. Visual, metallurgical, and biological analyses were performed on the LDB. The analysis results showed that there was not any adverse microbiological growth or significant localized corrosion. The corrosion of the LDB was caused by exposure to aqueous environments and was typical of carbon steel pipes in soil environments.'

Mickalonis, J.I.

1999-07-29T23:59:59.000Z

431

Shearing Box Simulations of the MRI in a Collisionless Plasma  

SciTech Connect (OSTI)

We describe local shearing box simulations of turbulence driven by the magnetorotational instability (MRI) in a collisionless plasma. Collisionless effects may be important in radiatively inefficient accretion flows, such as near the black hole in the Galactic Center. The MHD version of ZEUS is modified to evolve an anisotropic pressure tensor. A fluid closure approximation is used to calculate heat conduction along magnetic field lines. The anisotropic pressure tensor provides a qualitatively new mechanism for transporting angular momentum in accretion flows (in addition to the Maxwell and Reynolds stresses). We estimate limits on the pressure anisotropy due to pitch angle scattering by kinetic instabilities. Such instabilities provide an effective ''collision'' rate in a collisionless plasma and lead to more MHD-like dynamics. We find that the MRI leads to efficient growth of the magnetic field in a collisionless plasma, with saturation amplitudes comparable to those in MHD. In the saturated state, the anisotropic stress is comparable to the Maxwell stress, implying that the rate of angular momentum transport may be moderately enhanced in a collisionless plasma.

Sharma, Prateek; Hammett, Gregory, W.; Quataert, Eliot; Stone, James, M.

2005-08-31T23:59:59.000Z

432

Investigation of increased mercury levels in the fisheries of Lower East Fork Poplar Creek (Lefpc), Oak Ridge Reservation, Tennessee  

SciTech Connect (OSTI)

The DOE Western Environmental Technology Office (WETO) is supporting remediation efforts on the U.S. Department of Energy Oak Ridge Reservation in Oak Ridge, Tennessee by performing this study. MSE Technology Applications, Inc. (MSE) has performed a series of literature reviews and bench-scale testing to further evaluate the mercury problem in the Lower East Fork Poplar Creek (LEFPC) at Oak Ridge. The primary problem is that total mercury (HgT) levels in LEFPC water decrease, while HgT levels in sunfish muscle tissue increase, with distance away from the National Security Complex (NSC), despite extensive source control efforts at the facility and within downstream riparian zones. Furthermore, dissolved methylmercury (d-MeHg) levels increase downstream from the NSC, especially during warm weather and/or high flow events. MSE performed four test series that focused on conversion of aqueous phase elemental mercury (Hg deg. A) to methyl mercury (MeHg) by algal-bacterial bio-films (periphyton) present in the stream-bed of LEFPC. Small (mg/L) quantities of un-sulphured molasses and peptone were added to some of the Hinds Creek samples to stimulate initial bacterial growth. Other Hinds Creek samples either were dosed with glutaraldehyde to preclude microbial growth, or were wrapped in aluminum foil to preclude Hg photochemical redox effects. The bench-scale testing for Phase II was completed August 2006. The final reporting and the planning for Phase III testing are in progress. (authors)

Byrne-Kelly, D.; Cornish, J.; Hart, A. [MSE Technology Applications, Inc., 200 Technology Way, Butte, MT (United States); Southworth, G. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); Sims, L. [Bechtel Jacobs Company, Oak Ridge, TN (United States)

2007-07-01T23:59:59.000Z

433

Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge.

NONE

1996-08-01T23:59:59.000Z

434

Process Switches and Branch Prediction Accuracy David Chen, Bennett Lau, Jeffrey Shafer  

E-Print Network [OSTI]

to "repair" the destructive aliasing in the branch history table after a process switch, both combine in modern deeply pipelined superscalar machines. The penalty of a mispredicted branch can be quite high [6

Rixner, Scott

435

E-Print Network 3.0 - arterial branch points Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

branch points Search Powered by Explorit Topic List Advanced Search Sample search results for: arterial branch points Page: << < 1 2 3 4 5 > >> 1 CONTRIBUTIONS I<'ROM THE...

436

UBS AG, LONDON BRANCH Order No. EA-263 I. BACKGROUND  

Broader source: Energy.gov (indexed) [DOE]

3 3 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On April 11, 2002, the Office of Fossil Energy (FE) of the Department of Energy (DOE) received an application from UBS, AG London Branch (UBS) for authorization to transmit electric energy from the Untied States to Mexico and to Canada. UBS, a Swiss corporation formed in 1998 by the merger of Union Bank of Switzerland and Swiss Bank Corporation, is a power marketer that does not own or control any electric generation or transmission facilities nor does it have any franchised service territory in the United States. The designation "London Branch" indicates the principal booking location of the company's energy trading business; UBS

437

North Branch Water & Light Comm | Open Energy Information  

Open Energy Info (EERE)

North Branch Water & Light Comm North Branch Water & Light Comm Place Minnesota Utility Id 13681 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Commercial Large General Service Industrial Residential Residential Residential- Seasonal Residential Average Rates Residential: $0.1250/kWh Commercial: $0.1140/kWh Industrial: $0.0750/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

438

Wells Branch, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Branch, Texas: Energy Resources Branch, Texas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 30.4460353°, -97.6794507° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.4460353,"lon":-97.6794507,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

439

: Hanson Blata, Chief, Radiation Branch Health & Safety Division  

Office of Legacy Management (LM)

Hanson Blata, Chief, Radiation Branch Hanson Blata, Chief, Radiation Branch Health & Safety Division ,DATTE: July 25, 1952 FROM : Eugene Barry, Radiation Brsnchctr@ Health & Safety Division SL-JEm: VISIT TO CANADIAN RADIUM AND UFLANIUM CO, MT. K&O, N. Y. - MAY 28, 1952 SrnOL: HSR:.WB:md On May 28, a visit was made to the Canadian Radium and Uranium Co. of Mt. Kisco, New York, a manufacturer and distributor of radium and polonium products, for the purpose of assisting the New York State Department of Labor in making a contamination S.U"Jey. The following types of samples were taken: 1 l/811 diameter Whatman #&. filter paper smear samples for measuring removable alpha contamination, general air and locsl'air radon samples, air dust samples utilizing the Hudson air sampler with

440

Branching Fraction Measurement of B to omega l nu decays  

SciTech Connect (OSTI)

We present a measurement of the B{sup +} {yields} {omega}{ell}{sup +}{nu} branching fraction based on a sample of 467 million B{bar B} pairs recorded by the BABAR detector at the SLAC PEP-II e{sup +}e{sup -} collider. We observe 1041 {+-} 133 signal decays, corresponding to a branching fraction of {Beta}(B{sup +} {yields} {omega}{ell}{sup +}{nu}) = (1.15 {+-} 0.15 {+-} 0.12) x 10{sup -4}, where the first error is statistical and the second is systematic. The dependence of the decay rate on q{sup 2}, the momentum transfer squared to the lepton system, is compared to QCD predictions of the form factors based on a quark model and light-cone sum rules.

Lees, J.P.; Poireau, V.; Tisserand, V.; /Annecy, LAPP; Garra Tico, J.; Grauges, E.; /Barcelona U., ECM; Palano, A.; /Bari U. /INFN, Bari; Eigen, G.; Stugu, B.; /Bergen U.; Brown, D.N.; Kerth, L.T.; Kolomensky, Yu.G.; Lynch, G.; /LBL, Berkeley /UC, Berkeley; Koch, H.; Schroeder, T.; /Ruhr U., Bochum; Asgeirsson, D.J.; Hearty, C.; Mattison, T.S.; McKenna, J.A.; So, R.Y.; /British Columbia U.; Khan, A.; /Brunel U.; Blinov, V.E.; /Novosibirsk, IYF /UC, Irvine /UC, Riverside /UC, Santa Barbara /UC, Santa Cruz /Caltech /Cincinnati U. /Colorado U. /Colorado State U. /Dortmund U. /Dresden, Tech. U. /Ecole Polytechnique /Edinburgh U. /Ferrara U. /INFN, Ferrara /Frascati /Genoa U. /INFN, Genoa /Indian Inst. Tech., Guwahati /Harvard U. /Harvey Mudd Coll. /Heidelberg U. /Humboldt U., Berlin /Imperial Coll., London /Iowa State U. /Iowa State U. /Johns Hopkins U. /Orsay, LAL /LLNL, Livermore /Liverpool U. /Queen Mary, U. of London /Royal Holloway, U. of London /Louisville U. /Mainz U., Inst. Kernphys. /Manchester U., Comp. Sci. Dept. /Maryland U. /Massachusetts U., Amherst /MIT /McGill U. /Milan U. /INFN, Milan /Mississippi U. /Montreal U. /Naples U. /INFN, Naples /NIKHEF, Amsterdam /Notre Dame U. /Ohio State U.; /more authors..

2012-06-13T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Precision measurement of the $D^{*0}$ decay branching fractions  

E-Print Network [OSTI]

Using 482 pb$^{-1}$ of data taken at $\\sqrt{s}=4.009$ GeV, we measure the branching fractions of the decays of $D^{*0}$ into $D^0\\pi^0$ and $D^0\\gamma$ to be $\\BR(D^{*0} \\to D^0\\pi^0)=(65.5\\pm 0.8\\pm 0.5)%$ and $\\BR(D^{*0} \\to D^0\\gamma)=(34.5\\pm 0.8\\pm 0.5)%$ respectively, by assuming that the $D^{*0}$ decays only into these two modes. The ratio of the two branching fractions is $\\BR(D^{*0} \\to D^0\\pi^0)/\\BR(D^{*0} \\to D^0\\gamma) =1.90\\pm 0.07\\pm 0.05$, which is independent of the assumption made above. The first uncertainties are statistical and the second ones systematic. The precision is improved by a factor of three compared to the present world average values.

M. Ablikim; M. N. Achasov; X. C. Ai; O. Albayrak; M. Albrecht; D. J. Ambrose; A. Amoroso; F. F. An; Q. An; J. Z. Bai; R. Baldini Ferroli; Y. Ban; D. W. Bennett; J. V. Bennett; M. Bertani; D. Bettoni; J. M. Bian; F. Bianchi; E. Boger; O. Bondarenko; I. Boyko; R. A. Briere; H. Cai; X. Cai; O. Cakir; A. Calcaterra; G. F. Cao; S. A. Cetin; J. F. Chang; G. Chelkov; G. Chen; H. S. Chen; H. Y. Chen; J. C. Chen; M. L. Chen; S. J. Chen; X. Chen; X. R. Chen; Y. B. Chen; H. P. Cheng; X. K. Chu; G. Cibinetto; D. Cronin-Hennessy; H. L. Dai; J. P. Dai; A. Dbeyssi; D. Dedovich; Z. Y. Deng; A. Denig; I. Denysenko; M. Destefanis; F. De Mori; Y. Ding; C. Dong; J. Dong; L. Y. Dong; M. Y. Dong; S. X. Du; P. F. Duan; J. Z. Fan; J. Fang; S. S. Fang; X. Fang; Y. Fang; L. Fava; F. Feldbauer; G. Felici; C. Q. Feng; E. Fioravanti; M. Fritsch; C. D. Fu; Q. Gao; Y. Gao; I. Garzia; K. Goetzen; W. X. Gong; W. Gradl; M. Greco; M. H. Gu; Y. T. Gu; Y. H. Guan; A. Q. Guo; L. B. Guo; T. Guo; Y. Guo; Y. P. Guo; Z. Haddadi; A. Hafner; S. Han; Y. L. Han; F. A. Harris; K. L. He; Z. Y. He; T. Held; Y. K. Heng; Z. L. Hou; C. Hu; H. M. Hu; J. F. Hu; T. Hu; Y. Hu; G. M. Huang; G. S. Huang; H. P. Huang; J. S. Huang; X. T. Huang; Y. Huang; T. Hussain; Q. Ji; Q. P. Ji; X. B. Ji; X. L. Ji; L. L. Jiang; L. W. Jiang; X. S. Jiang; J. B. Jiao; Z. Jiao; D. P. Jin; S. Jin; T. Johansson; A. Julin; N. Kalantar-Nayestanaki; X. L. Kang; X. S. Kang; M. Kavatsyuk; B. C. Ke; R. Kliemt; B. Kloss; O. B. Kolcu; B. Kopf; M. Kornicer; W. Kuehn; A. Kupsc; W. Lai; J. S. Lange; M. Lara; P. Larin; C. H. Li; Cheng Li; D. M. Li; F. Li; G. Li; H. B. Li; J. C. Li; Jin Li; K. Li; K. Li; P. R. Li; T. Li; W. D. Li; W. G. Li; X. L. Li; X. M. Li; X. N. Li; X. Q. Li; Z. B. Li; H. Liang; Y. F. Liang; Y. T. Liang; G. R. Liao; D. X. Lin; B. J. Liu; C. L. Liu; C. X. Liu; F. H. Liu; Fang Liu; Feng Liu; H. B. Liu; H. H. Liu; H. H. Liu; H. M. Liu; J. Liu; J. P. Liu; J. Y. Liu; K. Liu; K. Y. Liu; L. D. Liu; P. L. Liu; Q. Liu; S. B. Liu; X. Liu; X. X. Liu; Y. B. Liu; Z. A. Liu; Zhiqiang Liu; Zhiqing Liu; H. Loehner; X. C. Lou; H. J. Lu; J. G. Lu; R. Q. Lu; Y. Lu; Y. P. Lu; C. L. Luo; M. X. Luo; T. Luo; X. L. Luo; M. Lv; X. R. Lyu; F. C. Ma; H. L. Ma; L. L. Ma; Q. M. Ma; S. Ma; T. Ma; X. N. Ma; X. Y. Ma; F. E. Maas; M. Maggiora; Q. A. Malik; Y. J. Mao; Z. P. Mao; S. Marcello; J. G. Messchendorp; J. Min; T. J. Min; R. E. Mitchell; X. H. Mo; Y. J. Mo; C. Morales Morales; K. Moriya; N. Yu. Muchnoi; H. Muramatsu; Y. Nefedov; F. Nerling; I. B. Nikolaev; Z. Ning; S. Nisar; S. L. Niu; X. Y. Niu; S. L. Olsen; Q. Ouyang; S. Pacetti; P. Patteri; M. Pelizaeus; H. P. Peng; K. Peters; J. L. Ping; R. G. Ping; R. Poling; Y. N. Pu; M. Qi; S. Qian; C. F. Qiao; L. Q. Qin; N. Qin; X. S. Qin; Y. Qin; Z. H. Qin; J. F. Qiu; K. H. Rashid; C. F. Redmer; H. L. Ren; M. Ripka; G. Rong; X. D. Ruan; V. Santoro; A. Sarantsev; M. Savri; K. Schoenning; S. Schumann; W. Shan; M. Shao; C. P. Shen; P. X. Shen; X. Y. Shen; H. Y. Sheng; M. R. Shepherd; W. M. Song; X. Y. Song; S. Sosio; S. Spataro; B. Spruck; G. X. Sun; J. F. Sun; S. S. Sun; Y. J. Sun; Y. Z. Sun; Z. J. Sun; Z. T. Sun; C. J. Tang; X. Tang; I. Tapan; E. H. Thorndike; M. Tiemens; D. Toth; M. Ullrich; I. Uman; G. S. Varner; B. Wang; B. L. Wang; D. Wang; D. Y. Wang; K. Wang; L. L. Wang; L. S. Wang; M. Wang; P. Wang; P. L. Wang; Q. J. Wang; S. G. Wang; W. Wang; X. F. Wang; Y. D. Wang; Y. F. Wang; Y. Q. Wang; Z. Wang; Z. G. Wang; Z. H. Wang; Z. Y. Wang; T. Weber; D. H. Wei; J. B. Wei; P. Weidenkaff; S. P. Wen; U. Wiedner; M. Wolke; L. H. Wu; Z. Wu; L. G. Xia; Y. Xia; D. Xiao; Z. J. Xiao; Y. G. Xie; G. F. Xu; L. Xu; Q. J. Xu; Q. N. Xu; X. P. Xu; L. Yan; W. B. Yan; W. C. Yan; Y. H. Yan; H. X. Yang; L. Yang; Y. Yang; Y. X. Yang; H. Ye; M. Ye; M. H. Ye; J. H. Yin; B. X. Yu; C. X. Yu; H. W. Yu; J. S. Yu; C. Z. Yuan; W. L. Yuan; Y. Yuan; A. Yuncu; A. A. Zafar; A. Zallo; Y. Zeng; B. X. Zhang; B. Y. Zhang; C. Zhang; C. C. Zhang; D. H. Zhang; H. H. Zhang; H. Y. Zhang; J. J. Zhang; J. L. Zhang; J. Q. Zhang; J. W. Zhang; J. Y. Zhang; J. Z. Zhang; K. Zhang; L. Zhang; S. H. Zhang; X. Y. Zhang; Y. Zhang; Y. H. Zhang; Z. H. Zhang; Z. P. Zhang; Z. Y. Zhang; G. Zhao; J. W. Zhao; J. Y. Zhao; J. Z. Zhao; Lei Zhao; Ling Zhao; M. G. Zhao; Q. Zhao; Q. W. Zhao; S. J. Zhao; T. C. Zhao; Y. B. Zhao; Z. G. Zhao; A. Zhemchugov; B. Zheng; J. P. Zheng; W. J. Zheng; Y. H. Zheng; B. Zhong; L. Zhou; Li Zhou; X. Zhou; X. K. Zhou; X. R. Zhou; X. Y. Zhou; K. Zhu; K. J. Zhu; S. Zhu; X. L. Zhu; Y. C. Zhu; Y. S. Zhu; Z. A. Zhu; J. Zhuang; B. S. Zou; J. H. Zou; for BESIII Collaboration

2014-12-15T23:59:59.000Z

442

Agriculture and Food Processes Branch program summary document  

SciTech Connect (OSTI)

The work of the Agriculture and Food Processes Branch within the US DOE's Office of Industrial Programs is discussed and reviewed. The Branch is responsible for assisting the food and agricultural sectors of the economy in increasing their energy efficiency by cost sharing with industry the development and demonstration of technologies industry by itself would not develop because of a greater than normal risk factor, but have significant energy conservation benefits. This task is made more difficult by the diversity of agriculture and the food industry. The focus of the program is now on the development and demonstration of energy conservation technology in high energy use industry sectors and agricultural functions (e.g., sugar processing, meat processing, irrigation, and crop drying, high energy use functions common to many sectors of the food industry (e.g., refrigeration, drying, and evaporation), and innovative concepts (e.g., energy integrated farm systems. Specific projects within the program are summarized. (LCL)

None

1980-06-01T23:59:59.000Z

443

The genealogy of branching Brownian motion with absorption  

E-Print Network [OSTI]

We consider a system of particles which perform branching Brownian motion with negative drift and are killed upon reaching zero, in the near-critical regime where the total population stays roughly constant with approximately N particles. We show that the characteristic time scale for the evolution of this population is of order $(\\log N)^3$, in the sense that when time is measured in these units, the scaled number of particles converges to a variant of Neveu's continuous-state branching process. Furthermore, the genealogy of the particles is then governed by a coalescent process known as the Bolthausen-Sznitman coalescent. This validates the nonrigorous predictions by Brunet, Derrida, Muller and Munier for a closely related model.

Julien Berestycki; Nathanal Berestycki; Jason Schweinsberg

2010-01-13T23:59:59.000Z

444

UBS AG, LONDON BRANCH Order No. EA-261 I. BACKGROUND  

Broader source: Energy.gov (indexed) [DOE]

1 1 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On April 11, 2002, the Office of Fossil Energy (FE) of the Department of Energy (DOE) received an application from UBS AG, London Branch (UBS) for authorization to transmit electric energy from the United States to Mexico. UBS, a Swiss corporation formed in 1998 by the merger of Union Bank of Switzerland and Swiss Bank Corporation, is a power marketer that does not own or control any electric generation or transmission facilities nor does it have any franchised service territory in the United States. The designation "London Branch" indicates the

445

Christian Branches, Maori Roots: The Cult of Rua  

E-Print Network [OSTI]

Allan Hanson CHRISTIAN BRANCHES, MAORI ROOTS: THE CULT OF RUA During the first third of the twentieth century a New Zealand Maori named Rua Kenana, proclaiming himself to be a Messiah and the brother of Jesus, or even Jesus himself, headed a... Hanson and Fransje Knops for critical comments. I Rua's cult had received very little scholarly attention prior to the appearance of two books, researched independently but both published in 1979. Judith Binney, Gillian Chaplin, and Craig Wallace...

Hanson, F. Allan

1990-11-01T23:59:59.000Z

446

Regulating the ethylene response of a plant by modulation of F-box proteins  

SciTech Connect (OSTI)

The invention relates to transgenic plants having reduced sensitivity to ethylene as a result of having a recombinant nucleic acid encoding an F-box protein that interacts with a EIN3 involved in an ethylene response of plants, and a method of producing a transgenic plant with reduced ethylene sensitivity by transforming the plant with a nucleic acid sequence encoding an F-box protein. The inventions also relates to methods of altering the ethylene response in a plant by modulating the activity or expression of an F-box protein.

Guo, Hongwei (Beijing, CN); Ecker, Joseph R. (Carlsbad, CA)

2011-03-08T23:59:59.000Z

447

Modelling and forecasting Oman crude oil prices using Box-Jenkins techniques  

Science Journals Connector (OSTI)

The Box-Jenkins' Auto Regressive Integrated Moving Average (ARIMA) modelling approach has been applied for the time series analysis of monthly average prices of Oman crude oil taken over a period of 10 years. Several seasonal and non-seasonal ARIMA models were identified. These models were then estimated and compared for their adequacy using the significance of the parameter estimates, mean square errors and Modified Box-Pierce (Ljung-Box) Chi-Square statistic. Based on these criterion a multiplicative seasonal model of the form ARIMA (1,1,5)x(1,1,1) was recommended for short term forecasting.

M.I. Ahmad

2012-01-01T23:59:59.000Z

448

Thermodynamic Branch in the Chemical System Response to External Impact  

E-Print Network [OSTI]

The paper gives an account of a detailed investigation of the thermodynamic branch as a path of the chemical system deviation from its isolated thermodynamic equilibrium under an external impact. For a combination of direct and reverse reactions in the same chemical system, full thermodynamic branch is presented by an S-shaped curve, whose ends asymptotically achieve appropriate initial states, which, in turn, are logistic ends of the opposite reactions. The slope tangents of the steepest parts of the curves, the areas of the maximum rate of the shift growth vs. the external thermodynamic force, occurred to be directly proportional to the force and, simultaneously, linearly proportional to the thermodynamic equivalent of chemical reaction, which is the ratio between the amount in moles of any reaction participant, transformed in an isolated system, along the reaction way from its initial state to thermodynamic equilibrium, to its stoichiometric coefficient. The found linearity is valid for arbitrary combination of the stoichiometric coefficients in a reaction of compound synthesis from chemical elements like aA+bB=AaBb, and confirms the exclusive role of the thermodynamic equivalent of transformation as the chemical system characteristic of robustness and irreversibility. Results of this work allow for quantitative evaluation of the chemical system shift from thermodynamic equilibrium along thermodynamic branch and its rate vs. the shifting force. Such an investigation became possible due to the development of discrete thermodynamics of chemical equilibria.

B. Zilbergleyt

2012-03-20T23:59:59.000Z

449

A BreakEven Formulation for Evaluating Branch Predictor Energy Efficiency #  

E-Print Network [OSTI]

A Break­Even Formulation for Evaluating Branch Predictor Energy Efficiency # Michele Co, Dee A demonstrated that a better branch pre­ dictor can increase the energy­efficiency of the system, even if the new a simple, effective metric for eval­ uating the tradeoff between processor energy­efficiency and branch

Co, Michele

450

A new formulation of the spine approach to branching Robert Hardy and Simon C. Harris  

E-Print Network [OSTI]

deviations for a continuous­typed branching di#usion in Git, J.W.Harris and S.C.Harris [8] and HardyA new formulation of the spine approach to branching di#usions Robert Hardy and Simon C. Harris in branching di#usions: see, for example, the L p convergence of additive martingales in Hardy and Harris [12

Harris, Simon Colin

451

A new formulation of the spine approach to branching Robert Hardy and Simon C. Harris  

E-Print Network [OSTI]

deviations for a continuous-typed branching diffusion in Git, J.W.Harris and S.C.Harris [8] and HardyA new formulation of the spine approach to branching diffusions Robert Hardy and Simon C. Harris in branching diffusions: see, for example, the Lp convergence of additive martingales in Hardy and Harris [12

Harris, Simon Colin

452

Market Potential Analysis and Branch Network Planning: Application in a German Retail Bank  

Science Journals Connector (OSTI)

Location problems are an integral part of strategic planning in many kinds of industries. Optimizing an organization's branch network requires considering multiple criteria such as location characteristics, branch performance, and competitors' locations. ... Keywords: Location Analysis, Branch Network Planning, Location Optimization, Maximal Covering Location Problem, MCLP, Retail Banking

Stephan Schneider; Florian Seifert; Ali Sunyaev

2014-01-01T23:59:59.000Z

453

EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio  

Broader source: Energy.gov (indexed) [DOE]

EM SSAB NATIONAL CHAIRS MEETING EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 DAY 1 - Tuesday, November 5, 2013 8:00 a.m. - 8:20 a.m. Welcome and Opening Remarks Cate Alexander, EM SSAB Designated Federal Officer Will Henderson, Chair, Portsmouth Site Specific Advisory Board William Murphie, Manager, Portsmouth Paducah Project Office, DOE-EM 8:20 a.m. - 8:30 a.m. Overview of Meeting Eric Roberts, Facilitator 8:30 a.m. - 9:30 a.m. EM Program Update Alice Williams, Associate Principal Deputy Assistant Secretary for Environmental Management 9:30 a.m. - 10:20 a.m. Round Robin (Chairs' Site Reports) 5 minutes each 10:20 a.m. - 10:30 a.m. Recognition of Departing Chairs 10:30 a.m. - 10:45 a.m. Break 10:45 a.m. - 12:00

454

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

455

Deposition and diagenesis of a cratonic Silurian platform reef, Pipe Creek Jr. , Indiana  

SciTech Connect (OSTI)

Petrographic and geochemical characteristics of the Pipe Creek Jr. paragenesis record the stratigraphic and burial evolution of the cratonic Silurian platform of Indiana during Late Silurian to Pennsylvanian. A variety of several diagenetic fluids acting over geological time affected the reef. The paragenetic sequence is as follows: (1) precipitation of turbid, fibrous, blotchy cathodoluminescent (CL) cement; (2) dolomitization of mud-rich facies; (3) precipitation of clear, zoned CL equant calcite cements; (4) fracturing and karst formation, partially filled by geopetal silt and sandstone; (5) precipitation of clear, dull CL, ferroan to nonferroan equant calcite cement, ferroan dolomite overgrowth and equant dolomite cement in moldic porosity, caves and fractures; (6) microdissolution and hydrocarbon emplacement; and (7) stylolitization. Carbonate grew and fibrous cements precipitated in an open marine environment. During Late Silurian an increasingly restricted environment stopped reef growth and dolomite replaced mud-rich faces. The reefs were then subaerially exposed and two meteoric cement sequences, non-luminescent to bright luminescent, precipitated prior to Mid-Devonian fracture-controlled karsting. Caves and fractures crosscut former cement stages and were filled by sandstones. Later, the platform was buried by the late Mid-Devonian organic-rich New Albany Shale, and clear, dull CL calcite cement and ferroan dolomite precipitated. Hydrocarbon migration postdates all cements and created minor moldic porosity and predates stylolitization.

Simo, A.; Lehmann, P.

1988-01-01T23:59:59.000Z

456

Vegetation trends in reclaimed areas at Gibbons Creek Lignite Mine, Grimes County, Texas  

SciTech Connect (OSTI)

Vegetation productivity and cover studies have been conducted annually at the Gibbons Creek Lignite Mine since 1989, and multiple annual clippings have been collected since 1991. The primary purpose of these studies was to examine revegetation success, in terms of herbaceous productivity, for various post-mine soil types. However, the studies also contain detailed information on species composition. For the years in which multiple annual clippings have been collected (1991 through 1996), total vegetation cover increased, with the mean proportion of bare ground dropping from 12% in 1991 to 1% in 1996. Relative proportions of most introduced and native grasses were virtually static from 1991 through 1994; in 1995, however, herbicide applications to reduce clover cover resulted in a dramatic increase in total grass cover, especially in bahiagrass (Paspalum notatum) and Indiangrass (Sorgastrum nutans). In contrast to the trends of other introduced and native grasses, bahiagrass increased in cover throughout the study period, increasing from 7% in 1991 to 21 % in 1996. Annual and weedy grass species decreased in cover throughout the study period, falling from 12% cover in 1991 to 2% in 1996. This trend of displacement of annuals by perennials is typically observed during ecological succession in natural vegetation communities, and appears to have been accelerated by the herbicide application.

Westerman, C.A. [Morrison Knudsen Corp., San Antonio, TX (United States)

1997-12-31T23:59:59.000Z

457

TO. TO. , W. B; Harris, Chief, Industrial Hygiene'Branch DA , W. B; Harris, Chief, Industrial Hygiene'Branch DA  

Office of Legacy Management (LM)

~~~~;.Offi~~~~~~~~~~~ ~~~~;.Offi~~~~~~~~~~~ ,/-; l UNITED STh , :__ .~. :__ .~. , , TO. TO. , W. B; Harris, Chief, Industrial Hygiene'Branch DA , W. B; Harris, Chief, Industrial Hygiene'Branch DA Health and Safet Division pa& 1 Ps B.- Klevin :mL -y!yG hMBOL: HSH:PBK hMBOL: HSH:PBK : 1. Purpose of Visit >.. a. To study operations planned by~Bu.reau of Ea: factors for Be, II, thorium, zirconium, etc, i b. ,'To explain to Bureauof Mines' personnel tl in handling any of the aforementioned mate] 2. Scope of Work The Bureau of l&s'mill make a'study of the k several materials specified by-the New York 0p1 1 The study mill include the following tests for .a. Ignition~temperature~of a cloud. b. Determine the amount of inert required to L propagation in any of these materials.

458

REMARKS ON THE BOX PROBLEM. Nets Hawk Katz, Elliot Krop, Mauro Maggioni  

E-Print Network [OSTI]

REMARKS ON THE BOX PROBLEM. Nets Hawk Katz, Elliot Krop, Mauro Maggioni Washington University §0 by a National Science Foundation grant Typeset by AMS-TEX 1 #12;2 NETS HAWK KATZ, ELLIOT KROP, MAURO MAGGIONI

Maggioni, Mauro

459

Oak Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91...  

Broader source: Energy.gov (indexed) [DOE]

April 12, 2012 Susan Cange Acting Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 209:...

460

Oak Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91...  

Office of Environmental Management (EM)

October 16, 2012 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 211 :...

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

From Oak Ridge to the Moon (Y-12 Moon Box) | Y-12 National Security...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

From Oak Ridge to the Moon ... From Oak Ridge to the Moon (Y-12 Moon Box) The mp4 video format is not supported by this browser. Download video Captions: On Time: 5:26 min. Y-12...

462

Workers Remove Glove Boxes from Ventilation at Hanfords Plutonium Finishing Plant  

Broader source: Energy.gov [DOE]

An employee at Hanfords Plutonium Finishing Plant uses a portable band saw to cut the last ventilation duct attached to glove boxes inside the facilitys former processing area.

463

Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TR:GS:14-0086:UFC 1200.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 November 4, 2014 Eddy and Lea County Residents: We continue to make...

464

Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CBFO:JF:GS:14-0025:UFC 1200.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 April 18, 2014 Eddy and Lea Country Residents: This has been an...

465

Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GS:14-0014:UFC 5486 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 March 12, 2014 To Eddy and Lea County Residents: As the Department of...

466

Carlsbad Field Orfice P. O. Box 3090 Carlsbad, New Mexico 88221  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Orfice P. O. Box 3090 Carlsbad, New Mexico 88221 APR 2 4 2 012 Mr. John Kieling , Acting Bureau Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive...

467

Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BW:GS:14-0032:UFC 1200.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 May 2, 2014 Eddy and Lea County Residents: We continue to make...

468

Shadow: Running Tor in a Box for Accurate and Efficient Experimentation Technical Report  

E-Print Network [OSTI]

Rob Jansen and Nicholas J. Hopper September 23, 2011 #12;#12;Shadow: Running Tor in a Box for Accurate and Efficient Experimentation Rob Jansen U.S. Naval Research Laboratory rob.g.jansen@nrl.navy.mil Nicholas

Minnesota, University of

469

E-Voting and Forensics: Prying Open the Black Box Matt Bishop and Sean Peisert  

E-Print Network [OSTI]

E-Voting and Forensics: Prying Open the Black Box Matt Bishop and Sean Peisert Department of Computer Science University of California, Davis {bishop, peisert}@cs.ucdavis.edu Candice Hoke Cleveland

Bishop, Matt

470

EVoting and Forensics: Prying Open the Black Box Matt Bishop and Sean Peisert  

E-Print Network [OSTI]

E­Voting and Forensics: Prying Open the Black Box Matt Bishop and Sean Peisert Department of Computer Science University of California, Davis {bishop, peisert}@cs.ucdavis.edu Candice Hoke Cleveland

Bishop, Matt

471

a trust-region method for box-constrained nonlinear semidfinite ...  

E-Print Network [OSTI]

Nov 17, 2014 ... Methods and Softw., 28(4):871888, 2013. [21] Y. Xu, W. Sun, and L. Qi. A feasible direction method for the semidefinite program with box.

Akihiko Komatsu, Makoto Yamashita

2014-11-17T23:59:59.000Z

472

Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Satellite Television Industry Meeting Regarding DOE Set-Top Box Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking On April 3, 2012 at 11:00 AM, representatives of the U.S. satellite television industry, listed below, met with the DOE officials, listed below, at the Forestall Building to discuss matters of concern to the U.S. satellite television industry regarding the pending DOE rulemaking to establish energy conservation standards on set-top boxes (STBs) under title Ill of the Energy Policy and Conservation Act of 1974, as amended. Memo_Ex_Parte_Comm.pdf More Documents & Publications Memorandum Memorializing Ex Parte Communication, DOE impending determination of coverage for commercial and industrial fans, blowers, and

473

Examination of a Junction-Box Adhesion Test for Use in Photovoltaic Module Qualification: Preprint  

SciTech Connect (OSTI)

Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development. There are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp heat' IEC qualification test is proposed to verify the basic robustness of its adhesion system. The details of the proposed test will be described, in addition to the preliminary results obtained using representative materials and components. The described discovery experiments examine moisture-cured silicone, foam tape, and hot-melt adhesives used in conjunction with PET or glass module 'substrates.' To be able to interpret the results, a set of material-level characterizations was performed, including thermogravimetric analysis, differential scanning calorimetry, and dynamic mechanical analysis. PV j-boxes were adhered to a substrate, loaded with a prescribed weight, and then placed inside an environmental chamber (at 85C, 85% relative humidity). Some systems did not remain attached through the discovery experiments. Observed failure modes include delamination (at the j-box/adhesive or adhesive/substrate interface) and phase change/creep. The results are discussed in the context of the application requirements, in addition to the plan for the formal experiment supporting the proposed modification to the qualification test.

Miller, D. C.; Wohlgemuth, J. H.

2012-08-01T23:59:59.000Z

474

A study of post-thermal recovery of the macroinvertebrate community of Four Mile Creek, June 1985--September 1987. [Savannah River Plant  

SciTech Connect (OSTI)

Four Mile Creek is one of several streams at the Savannah River Site which has received thermal effluents ({le}70{degrees}C water) from nuclear production operations. From 1955--mid-1985, Four Mile Creek received thermal effluent from C-Reactor as well as non-thermal discharges from F and H Separation Areas. Total discharges from all of these facilities was about ten times higher than the natural flow of the creek (Firth et al. 1986). All water being discharged into Four Mile Creek was originally pumped from the Savannah River. This study reports the results of the artificial substrate sampling of macroinvertebrate communities of Four Mile Creek from June 1985 through September 1987, when sampling was terminated. Macroinvertebrate taxa richness, densities, and biomass data from this study are compared to Four Mile data collected prior to the shutdown of C-Reactor (Kondratieff and Kondratieff 1985 and Firth et al. 1986), and to comparable macroinvertebrate data from other Savannah River Site streams. 29 refs., 11 figs., 4 tabs.

Lauritsen, D.; Starkel, W.; Specht, W.

1989-11-01T23:59:59.000Z

475

Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission  

Office of Legacy Management (LM)

111989 111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W Enclosed are the copfes of the final ORNL survey reports on the radiologlcal Surveys conducted on three Teterboro, New Jersey properties; Metpath Incorporated, Allied Aerospace Corporatio; and Sumftomo Machinery Corporation. Copies of these reports have &en sent directly to the owners by our survey contractor Oak Ridge National Laboratory. If you have any questions regardfng these reports. please call me at (301) 353-5439. Sfncerely, Enclosure : < I j i Andrew Wallo III, Designation and Certffication Manager Dfvisfon 01 Facility and Site Oeconanlssionfng Projects

476

Measurement of the B- -> D0 K*- branching fraction  

E-Print Network [OSTI]

From a sample of 232 million Upsilon(4S)--> B B-bar events collected with the BABAR detector at the PEP-II B Factory in 1999--2004, we measure the B- --> D0 K*-(892) decay branching fraction using events where the K*- is reconstructed in the K0_S pi- mode and the D0 in the K- pi+, K- pi+ pi0, and K- pi+ pi+ pi- channels: B(B- --> D0 K*-(892)) = 5.29 +/- 0.30(stat) +/- 0.34 (syst)) X 10-4.

B. Aubert

2006-04-08T23:59:59.000Z

477

High-energy nuclear collisions in the geometrical branching model  

Science Journals Connector (OSTI)

The geometrical branching model, which has been successful in describing multiparticle production in hadron-hadron and hadron-nucleus collisions, is extended to the case of nucleus-nucleus collisions at high energy. We discuss the issue related to the collision between broken nucleons. The calculated result is in good agreement with the data. We show that the multiplicity and transverse-energy distributions of the produced particles are insensitive to the detail properties of hadronization. Measurable quantities that could reveal relevant information on them are suggested.

Rudolph C. Hwa and Xin-Nian Wang

1990-09-01T23:59:59.000Z

478

Spontaneous-fission branching in the decay of 104259  

Science Journals Connector (OSTI)

The nuclide 104259 has been produced in the Cf249(C13,3n) reaction. Alpha particle groups of 8.770.01 MeV and 8.870.01 MeV were attributed to the decay of 104159, and the measured half-life was found to be 3.01.3 s. The branching ratio for spontaneous fission decay was determined to be 0.0630.037.RADIOACTIVITY, FISSION 104259(sfand?), measured T12, E?, I?, Isf, ? for Cf249(C13,3n) and Cf249(C13,?2n) reactions; deduced sf? for 104259; enriched target.

C. E. Bemis; Jr.; P. F. Dittner; R. L. Ferguson; D. C. Hensley; F. Plasil; F. Pleasonton

1981-01-01T23:59:59.000Z

479

Measurement of the inclusive semielectronic D(0) branching fraction  

E-Print Network [OSTI]

Farlane, P. M. Patel, and B. Spaan McGill University and the Institute of Particle Physics, Montreal, Quebec H3A 2T8, Canada A. J. Sadoff Ithaca College, Ithaca, New York 14850 R. Ammar, P. Baringer, A. Bean, D. Besson, D. Coppage, N. Copty, R. Davis, N...PHYSICAL REVIEW D 1 SEPTEMBER 1996VOLUME 54, NUMBER 5ARTICLES Measurement of the inclusive semielectronic D0 branching fraction Y. Kubota, M. Lattery, J. K. Nelson, S. Patton, R. Poling, T. Riehle, V. Savinov, and R. Wang University of Minnesota...

Baringer, Philip S.

1996-09-01T23:59:59.000Z

480

Flow Characteristics Analysis of Widows' Creek Type Control Valve for Steam Turbine Control  

SciTech Connect (OSTI)

The steam turbine converts the kinetic energy of steam to mechanical energy of rotor blades in the power conversion system of fossil and nuclear power plants. The electric output from the generator of which the rotor is coupled with that of the steam turbine depends on the rotation velocity of the steam turbine bucket. The rotation velocity is proportional to the mass flow rate of steam entering the steam turbine through valves and nozzles. Thus, it is very important to control the steam mass flow rate for the load following operation of power plants. Among various valves that control the steam turbine, the control valve is most significant. The steam flow rate is determined by the area formed by the stem disk and the seat of the control valve. While the ideal control valve linearly controls the steam mass flow rate with its stem lift, the real control valve has various flow characteristic curves pursuant to the stem lift type. Thus, flow characteristic curves are needed to precisely design the control valves manufactured for the operating conditions of nuclear power plants. OMEGA (Optimized Multidimensional Experiment Geometric Apparatus) was built to experimentally study the flow characteristics of steam flowing inside the control valve. The Widows' Creek type control valve was selected for reference. Air was selected as the working fluid in the OMEGA loop to exclude the condensation effect in this simplified approach. Flow characteristic curves were plotted by calculating the ratio of the measured mass flow rate versus the theoretical mass flow rate of the air. The flow characteristic curves are expected to be utilized to accurately design and operate the control valve for fossil as well as nuclear plants. (authors)

Yoo, Yong H.; Sohn, Myoung S.; Suh, Kune Y. [PHILOSOPHIA, Inc., Seoul National University, San 56-1 Sillim-dong, Gwanak-gu, Seoul, 151-742 (Korea, Republic of)

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "branch boxes creek" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Sedimentology and depositional environments of part of the Walden Creek Group, central east Tennessee  

SciTech Connect (OSTI)

Recent questions concerning the age of the Walden Creek Group (WCG), Ocoee Supergroup have increased interest in the depositional history of these rocks. This study focuses on the sedimentology and local stratigraphy of rocks in exposures of the lithologically diverse late Precambrian and/or lower Paleozoic WCG occurring within the Kinzel Springs and Wear Cove quadrangles. Units exposed in the structurally complex Alleghenian thrust setting include the Licklog, Shields, and Wilhite formations. These rocks are divided into twelve lithofacies composed of shale, siltstone, sandstone, conglomerate and carbonate rock. The lithofacies are grouped into seven facies associations indicating deposition below storm wave base in a deep-water, probably marine, environment. Within the study area, rocks of the Wilhite Formation represent deposition in basin plain, lower slope, slope, base of slope, and sandy channel environments. Rocks of the Shields Formation are coarse channel and related overbank deposits of the inner to middle parts of a deep water fan environment. The Licklog Formation contains rocks deposited as lobe and outer-fan or fan-fringe deposits in a middle- to lower-fan environment. These formations can be placed within a single depositional system composed of a submarine slope transitional with a basin plain, and of proximal channels and distal lobes in a sand-rich submarine fan system. Inferred depositional components (associations) compare well with general models of deep-water deposits associated with high gradient fan-delta-fed margins. The basin was bounded by an uplifted, most likely block faulted, margin composed of crystalline basement located to the northwest. Local sedimentologic and stratigraphic relationships suggest an overall progradational sequence during the deposition of these rocks.

Lewis, R.F. III (Louisiana State Univ., Baton Rouge, LA (United States). Dept. of Geology and Geophysics); Miller, J.M.G. (Vanderbilt Univ., Nashville, TN (United States). Dept. of Geology)

1993-03-01T23:59:59.000Z

482

ds_branching_s034dsb-web.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

More More than a dozen papers on the D + s , most of them from the CLEO experiment, have been published since the 2008 Review. We now know enough to attempt an overview of the branching fractions. Figure 1 shows a partial breakdown of the fractions. The rest of this note is about how the figure was constructed. The values shown make heavy use of CLEO measurements of inclusive branching fractions [1] For other data and references cited in the following, see the Listings. Modes with leptons: The bottom (20.0 ± 0.9)% of Fig. 1 shows the fractions for the exclusive modes that include lep- tons. Measured e + ν e fractions have been doubled to get the semileptonic ℓ + ν fractions. The sum of the exclusive e + ν e frac- tions is (6.9 ± 0.4)%, consistent with an inclusive semileptonic e + ν e measurement of (6.5 ± 0.4)%. There seems to be little missing here. Inclusive hadronic KK fractions: The Cabibbo-favored

483

The Effect of Sedimentation on Plutonium Transport in Fourmile Branch  

SciTech Connect (OSTI)

The major mechanisms of radioactive material transport and fate in surface water are sources, dilution, advection and dispersion of radionuclides by flow and surface waves, radionuclide decay, and interaction between sediment and radionuclides. STREAM II, an aqueous transport module of the Savannah River Site emergency response WIND system, accounts for the source term, and the effects of dilution, advection and dispersion. Although the model has the capability to account for nuclear decay, due to the short time interval of interest for emergency response, the effect of nuclear decay is very small and so it is not employed. The interactions between the sediment and radionuclides are controlled by the flow conditions and physical and chemical characteristics of the radionuclides and the sediment constituents. The STREAM II version used in emergency response must provide results relatively quickly; it therefore does not model the effects of sediment deposition/resuspension. This study estimates the effects of sediment deposition/resuspension on aqueous plutonium transport in Fourmile Branch. There are no measured data on plutonium transport through surface water available for direct model calibration. Therefore, a literature search was conducted to find the range of plutonium partition coefficients based on laboratory experiments and field measurements. A sensitivity study of the calculated plutonium peak concentrations as a function of the input parameter of partition coefficient was then performed. Finally, an estimation of the plutonium partition coefficient was made for the Fourmile Branch.

Chen, K.F.

2002-02-21T23:59:59.000Z

484

Installation restoration program preliminary assessment/site inspection report. W.K. Kellogg, Battle Creek, MI. Final report  

SciTech Connect (OSTI)

Preliminary Assessment/Site Inspection Report of Areas Of concern (AOC) A thru F at WK Kellogg, Battle Creek, MI. A Preliminary Assessment/Site Inspection was performed on 6 AOC`s at WK Kellogg to confirm or deny the presence of contamination a the AOC`s. The AOC`s involved in this investigation include. AOC A, Waste Accumulation Area; AOC B, Motor Pool Drainage Ditch; AOC C, Fire Training Area South; AOC D, Fire Training Area West; AOC E, Old Hanger (Building 6900); AOC F, New Hanger (Building 6901). The recommendation is for AOC`s A and B continue to the RI/FS stage.

NONE

1996-04-01T23:59:59.000Z

485

Stratigraphic variations and secondary porosity within the Maynardville Limestone in Bear Creek Valley, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

To evaluate groundwater and surface water contamination and migration near the Oak Ridge Y-12 plant, a Comprehensive Groundwater Monitoring Plan was developed. As part of the Maynardville exit pathways monitoring program, monitoring well clusters were ii installed perpendicular to the strike of the Maynardville Limestone, that underlies the southern part of the Y-12 Plant and Bear Creek Valley (BCV). The Maynardville Project is designed to locate potential exit pathways of groundwater, study geochemical characteristics and factors affecting the occurrence and distribution of water-bearing intervals, and provide hydrogeologic information to be used to reduce the potential impacts of contaminants entering the Maynardville Limestone.

Goldstrand, P.M. [Univ. of Nevada, Reno, NV (United States)

1995-05-01T23:59:59.000Z

486

DOE/EA-1371; Integrated Natural Resources Management Plan, Environmental Assessment, and Finding of No Significant Impacts for Rock Creek Reserve (5/2001)  

Broader source: Energy.gov (indexed) [DOE]

INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN, ENVIRONMENTAL ASSESSMENT and Finding Of No Significant Impacts for ROCK CREEK RESERVE 2001-Closure DOE/EA - 1371 Department of Energy Rocky Flats Environmental Technology Site and The U.S. Fish & Wildlife Service May, 2001 Dear Stakeholder: Enclosed is the Final Rock Creek Reserve Integrated Natural Resources Management Plan (Plan), Environmental Assessment (EA), and Finding Of No Significant Impacts (FONSI). The Rock Creek Reserve was dedicated on May 17, 1999, to be jointly managed by the US Fish and Wildlife Service and US Department of Energy. This Plan/EA was developed in accordance with the National Environmental Policy Act (NEPA) process. Through cooperation with the U.S. Fish and Wildlife Service for joint

487

Trial Run of a Junction-Box Attachment Test for Use in Photovoltaic Module Qualification (Presentation)  

SciTech Connect (OSTI)

Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development and manufacturing process control. There are historical incidences of adverse effects (e.g., fires), caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp-heat', 'thermal-cycle', or 'creep' tests within the IEC qualification protocol is proposed to verify the basic robustness of the adhesion system. The details of the proposed test are described, in addition to a trial run of the test procedure. The described experiments examine 4 moisture-cured silicones, 4 foam tapes, and a hot-melt adhesive used in conjunction with glass, KPE, THV, and TPE substrates. For the purpose of validating the experiment, j-boxes were adhered to a substrate, loaded with a prescribed weight, and then subjected to aging. The replicate mock-modules were aged in an environmental chamber (at 85 deg C/85% relative humidity for 1000 hours; then 100 degrees C/<10% relative humidity for 200 hours) or fielded in Golden, Miami, and Phoenix for 1 year. Attachment strength tests, including pluck and shear test geometries, were also performed on smaller component specimens.

Miller, D.; Deibert, S.; Wohlgemuth, J.

2014-06-01T23:59:59.000Z

488

Gas Storage Potential of Li-decorated ExBox4+  

E-Print Network [OSTI]

The newly developed compound ExBox4+ is explored to check whether it is a proficient hydrogen storage material. Both exoherdal and endohedral hydrogen adsorption on ExBox4+ are studied. Endohedral hydrogen molecules interact strongly than exohedral ones. The hydrogen adsorption energy is as good as the recently studied charged fullerenes. The hydrogen storage capacity appears to be ~4.3 wt%. The endohedral CO sorption is also analysed with the help of DFT. The first principle DFT calculation and MD simulation are performed to investigate the effect of lithium doping on the gas adsorbing capacity and adsorption enthalpy as well as adsorption energy of ExBox4+.The metal atom interaction with ExBox4+is found to be pretty strong, and the interaction energy appears to be higher than the metal cohesive energy.The thermodynamic parameters suggest that metal doping method is spontaneous in nature. The analysis of adsorption energy, thermodynamic properties and MD simulation results suggest that Li doped ExBox4+ can b...

Das, Ranjita

2014-01-01T23:59:59.000Z

489

Calendar Year 1997 Annual Groundwater Monitoring Report For The Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report contains the groundwater and surface water monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation and Recovery Act (RCIU) post- closure permit (PCP) for the Bear Creek Hydrogeologic Regime (Bear Creek Regime), and as otherwise required by U.S. Department of Energy (DOE) Order 5400.1. In July 1997, the Temessee Department of Environment and Conservation (TDEC) approved several modifications to the RCRA post-closure corrective action monitoring requirements specified in the PCP. This report has been prepared in accordimce with these modified requirements.

Jones, S.B.

1998-02-01T23:59:59.000Z