Powered by Deep Web Technologies
Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Crapol, Edward P. James G. Blaine: Architect of Empire. Scholarly Resources, 2000. 157 pp. Paperback S  

E-Print Network (OSTI)

Edward James P. G. Blaine: Architect of Empire. Scholarlyof each is G. Blaine: Architect of Empire is divided into

Dehler, Gregory

2000-01-01T23:59:59.000Z

2

BPA Statutes.  

DOE Green Energy (OSTI)

This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

United States. Bonneville Power Administration.

1999-08-01T23:59:59.000Z

3

BPA Statutes.  

SciTech Connect

This publication includes the Bonneville Power Administration`s (BPA) authorities. It combines the two previous booklets of BPA authorities` and adds: sections of certain Appropriation Acts affecting BPA; a list of all other Appropriation Acts affecting BPA; a list of the acts authorizing Federal hydroelectric dams in the Columbia River Basin; portions of the Energy Policy Act of 1992 that specifically apply to BPA; portions of the Federal Power Act to provide context for the Energy Policy Act. The laws are in their United States Code format, rather than in the Public Law format as passed. Thus, the citation for Bonneville Project Act section 2(f) is shown as 16 USC {section}832a(f). Most people are familiar with the Public Law citations, so they have been retained and appear in italics at the end of each paragraph. In addition, later amendments to earlier laws are reflected in the United States Code language. For example, the Preference Act`s definition of ``Pacific Northwest`` (16 USC {section}837(b)) reflects the Northwest Power Act`s amendment of that term. The laws are presented in the numerical order they appear in the United States Code, rather than in the order in which they became law. Therefore, the Energy Policy Act of 1992 is presented first. This booklet is not, nor is it intended to be, an official reporter. All citations should be made to the United States Code or some other officially recognized reporter.

United States. Bonneville Power Administration.

1995-01-01T23:59:59.000Z

4

Blaine, Minnesota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Blaine, Minnesota: Energy Resources Blaine, Minnesota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 45.1607987°, -93.2349489° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.1607987,"lon":-93.2349489,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

5

Bonneville Power Administration (BPA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

6

Blaine County, Nebraska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Blaine County, Nebraska: Energy Resources Blaine County, Nebraska: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.8795565°, -99.9912254° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.8795565,"lon":-99.9912254,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

7

Blaine County, Oklahoma: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Blaine County, Oklahoma: Energy Resources Blaine County, Oklahoma: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.8825489°, -98.3964938° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.8825489,"lon":-98.3964938,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

8

BPA SF6 Emission Info  

NLE Websites -- All DOE Office Websites (Extended Search)

BPA SF 6 Emission Info Steve Lowder - 2012.12 slide 1 Discovering Emission Locations slide 2 BPA uses a FLIR leak detection camera (other methods available) Allows leaks to...

9

BPA / Doe Memo Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Watershed Management Program EIS (DOE/EIS-0265/SA-90) Watershed Management Program EIS (DOE/EIS-0265/SA-90) David Byrnes TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Naches River Water Treatment Plant Intake Screening Project Project No: 2002-052-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 4.23 Intake and Return Diversion Screens, 9.23 Construction: Erosion and Sediment Control Structures. Location: Yakima, Washington Proposed by: Bonneville Power Administration (BPA) and the City of Yakima Description of the Proposed Action: BPA is proposing to fund the upgrade of the intake structure for the City of Yakima's Water Treatment Plant. The existing traveling water screen at

10

City of Blaine, Washington (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Washington (Utility Company) Washington (Utility Company) Jump to: navigation, search Name City of Blaine Place Washington Utility Id 1818 Utility Location Yes Ownership M NERC WECC Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Electrical Rates - City Utilities V2 Commercial Electrical Rates - Federal Agencies Over 400 Amp Commercial Electrical Rates - Federal Agencies Under 400 Amp Commercial Electrical Rates - Industrial V2 Electrical Rates - Large Commercial Over 400 Amp Commercial Electrical Rates - Large Commercial Under 400 Amp Commercial

11

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

855: Creston-Bell Rebuild Project, Spokane and Lincoln 855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA Summary This EA (also known as DOE/EA-4406 or DOE/BP-4406) evaluates the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington. Additional information about this project is available on the BPA website. Public Comment Opportunities None available at this time. Documents Available for Download

12

BPA.gov - Bonneville Power Administration  

NLE Websites -- All DOE Office Websites

Navigate Up This page location is: Agency Portal Prod - Internal Pages home Sign In About | Careers | Contact | bpa.gov Search News & Us Expand News & Us Projects & Initiatives...

13

BPA Headquarters Now Gold Certified for Sustainability  

Energy.gov (U.S. Department of Energy (DOE))

BPA recently became the first federal agency in Portland, Oregon, to achieve the city's Sustainability at Work Gold Certification for sustainability efforts at its headquarters building.

14

Microsoft Word - CX-AccessRoads-KingCoWA-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2013 22, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: Covington District Culvert Replacements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: King County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within DNR owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. The current stream crossings do not meet DNR fish passage standards that will be in

15

Biomass Power Association (BPA) | Open Energy Information  

Open Energy Info (EERE)

Biomass Power Association (BPA) Biomass Power Association (BPA) Jump to: navigation, search Tool Summary Name: Biomass Power Association (BPA) Agency/Company /Organization: Biomass Power Association Sector: Energy Focus Area: Biomass, - Biomass Combustion, - Biomass Gasification, - Biomass Pyrolysis, - Biofuels Phase: Determine Baseline, Evaluate Options, Develop Goals Resource Type: Guide/manual User Interface: Website Website: www.usabiomass.org Cost: Free References: Biomass Power Association[1] The website includes information on biomass power basics, renewable electricity standards, and updates on legislation affecting biomass power plants. Overview "The Biomass Power Association is the nation's leading organization working to expand and advance the use of clean, renewable biomass

16

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network (OSTI)

is research and development, not capital construction. NPCC staff recommends designation as capital in the Hanford BPA phase 3. Overlaps with study funded by Grant PUD. 250322 250322 198605000 White Sturgeon

17

Category:Seattle, WA | Open Energy Information  

Open Energy Info (EERE)

Seattle, WA Seattle, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Seattle, WA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Seattle WA Puget Sound Energy Inc.png SVFullServiceRestauran... 60 KB SVHospital Seattle WA Puget Sound Energy Inc.png SVHospital Seattle WA ... 58 KB SVLargeHotel Seattle WA Puget Sound Energy Inc.png SVLargeHotel Seattle W... 57 KB SVLargeOffice Seattle WA Puget Sound Energy Inc.png SVLargeOffice Seattle ... 57 KB SVMediumOffice Seattle WA Puget Sound Energy Inc.png SVMediumOffice Seattle... 61 KB SVMidriseApartment Seattle WA Puget Sound Energy Inc.png SVMidriseApartment Sea... 58 KB SVOutPatient Seattle WA Puget Sound Energy Inc.png SVOutPatient Seattle W... 63 KB

18

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

19

WA_02_042_GENERAL_MOTORS_POWER_TRAIN_DIV_Waiver_of_Domestic_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA02042GENERALMOTORSPOWERTRAINDIVWaiverofDomestic.pdf WA02042GENERALMOTORSPOWERTRAINDIVWaiverofDomestic.pdf WA02042GENERALMOTORSPOWERTRAINDIVWaiverof...

20

WA_00_026_WASTE_MANAGEMENT_AND_PROC_INC_and_TEXACO_Waiver_of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA99018TEXACOENERGYSYSTEMSWaiverofDomesticandForei.pdf WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome.pdf WA1994001TEXACOEXPLORATIONANDPRODUCTIO...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Category:Yakima, WA | Open Energy Information  

Open Energy Info (EERE)

Yakima, WA Yakima, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Yakima, WA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Yakima WA Puget Sound Energy Inc.png SVFullServiceRestauran... 61 KB SVHospital Yakima WA Puget Sound Energy Inc.png SVHospital Yakima WA P... 58 KB SVLargeHotel Yakima WA Puget Sound Energy Inc.png SVLargeHotel Yakima WA... 58 KB SVLargeOffice Yakima WA Puget Sound Energy Inc.png SVLargeOffice Yakima W... 58 KB SVMediumOffice Yakima WA Puget Sound Energy Inc.png SVMediumOffice Yakima ... 57 KB SVMidriseApartment Yakima WA Puget Sound Energy Inc.png SVMidriseApartment Yak... 59 KB SVOutPatient Yakima WA Puget Sound Energy Inc.png SVOutPatient Yakima WA... 63 KB SVPrimarySchool Yakima WA Puget Sound Energy Inc.png

22

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Summary Summary * The Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the BPA/Lower Valley Transmission Project by Bonneville Power Administration (BPA). BPA is the lead federal agency on this project and supervises the preparation of the EIS. The U.S. Forest Service is a cooperating agency and assists BPA in EIS preparation. The Targhee and Bridger-Teton National Forests are crossed by BPA's existing transmission line and some of the alternatives. S.1 Purpose and Need For Action S.1.1 BPA Lower Valley Power and Light, Inc. (LVPL) buys electricity from BPA and then supplies it to the residences, farms and businesses of the Jackson and Afton, Wyoming areas. Since the late 1980s,

23

WA_97_032_CHEMICAL_INDUSTRY_ENVIROMENTAL_TECHNOLOGY_PROJECTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA97032CHEMICALINDUSTRYENVIROMENTALTECHNOLOGYPROJECTS.pdf WA97032CHEMICALINDUSTRYENVIROMENTALTECHNOL...

24

TEPS/BPA Information | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

TEPS/BPA Information | National Nuclear Security Administration TEPS/BPA Information | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog TEPS/BPA Information Home > About Us > Our Operations > Acquisition and Project Management > Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs) > TEPS/BPA Information

25

Microsoft Word - PSRP May 15 2009 _BPA_ Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

come from renewable, non-carbon-emitting generation. BPA also has completed asset management studies of needed capital upgrades and replacements for its aging transmission...

26

Oct 2009 final concurrence letter for BPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Justice Justice Office of Dispute Resolution - - Washington, D.C. 20530 October 22,2009 The Honorable Steven Chu Secretary for the U.S. Department of Energy Washington, D.C. 20585 - . -- - . Dear Secretary Chu, This is in reference to the letter dated January 15,2009, fiom your predecessor, Honorable Samuel W. Bodman, which accompanied a policy document outlining guidance for the use of binding arbitration in specified cases by the Bonneville Power Administration. The Attorney General has reviewed the document "Bonneville Power Administration's Guidance on the Use of Binding Arbitration for BPA Contracts" and concurs with the proposed policy for use of binding arbitration which is contained therein. Mr. Holder's concurrence is dated October 9,2009.

27

Final Environmental Assessment BPA's Hot Springs - Garrison  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA's Hot Springs - Garrison Fiber Optic Project DOE-EA-1 002 POWER ADMINISTRATION Bonneville Power Administration DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

28

WA_97_038_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreign_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA97038FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA97038FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA97038FORDMOTORCOMPANYWaiverofDomestican...

29

WA_01_007_SOLAR_TURBINES_Waiver_of_Domestic_and_Foreign_pate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA07012BOEINGCOMPANYWaiverofDomesticandForeignPate.pdf WA03001CHEVRONTEXACOWaiverofDomesticandForeignPate.pdf WA1993004SOLARTURBINEINCWaivero...

30

WA_99_018_TEXACO_ENERGY_SYSTEMS_Waiver_of_Domestic_and_Forei...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA03037MERIDIANAUTOSYSTEMSWaiverofDomesticandForei.pdf WA03001CHEVRONTEXACOWaiverofDomesticandForeignPate.pdf WA01019GENERALELECTRICCORPWaiver...

31

WA_1994_009_SAINT-BOBAIN-NORTON_INDUSTRIAL_CERAMICS_CORPORAT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA1993022NORTONCOMPANYWaiverofDomesticandForeignRi.pdf WA97009DETROITDIESELCORPORATIONWaiverofDomesticand.pdf WA1994007KYOCERAINDUSTRIALCERAMIC...

32

WA_1995_025_AMOCO_PRODUCTION_COMPANY_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA1995025AMOCOPRODUCTIONCOMPANYWaiverofDomesticand.pdf WA1995025AMOCOPRODUCTIONCOMPANYWaiverofDomesticand.pdf WA1995025AMOCOPRODUCTIONCOMPANYWaiverofDom...

33

WA_99_022_AIR_PRODUCTS_AND_CHEMICAL_Waiver_of_Domestic_and_F...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA99022AIRPRODUCTSANDCHEMICALWaiverofDomesticandF.pdf WA99022AIRPRODUCTSANDCHEMICALWaiverofDomesticandF.pdf WA99022AIRPRODUCTSANDCHEMICALWaiverofDome...

34

WA_04_054_ECR_INTERNATIONAL_Waiver_of_Patent_Rights_to_Inven...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA04039HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf WA07040GRAFTECHINTERNATIONALLTDW...

35

WA_07_016_OSRAM_SYLVANIA_Waiver_of_Patent_Rights_Under_a_DOE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA04016MACKTRUCKSWaiverofPatentRightsunderNRELSub.pdf WA06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf WA05031OSRAMSYLVANIAPRODUCTSWaiv...

36

Microsoft Word - PSRP May 15 2009 _BPA_ Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Specific Recovery Plan (PSRP) Name: Bonneville Power Administration (BPA) Program Specific Recovery Plan (PSRP) Name: Bonneville Power Administration (BPA) Borrowing Authority ($3.25B) PSRP Lead Program Office and/or Laboratory/Site Office: Bonneville Power Administration PSRP Lead Manager: Nancy Mitman phone: (503) 230 3998 e-mail: nmmitman@bpa.gov address: Bonneville Power Administration Data Call 8 Program-Specific Recovery Plan (PSRP) Template NEW TEMPLATE for Recovery Program Plans (RPPs) based on updated OMB guidance Does this program align with an existing PART program? Y/N Yes Does this program align with an existing CFDA program? Y/N No If it does not correspond to existing PART or CFDA please enter in Program Title Will align with BPA's actual PART program name. 1. Objectives:

37

To: ALLBPA Subject: Administrator Update Fellow BPA Employees,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2013 8:38 AM 26, 2013 8:38 AM To: ALLBPA Subject: Administrator Update Fellow BPA Employees, I would like to thank you again for your commitment to your work and to our mission over the past few weeks. My purpose in communicating with you today is to reiterate the key messages I have been sharing with BPA's leadership team. At the moment, I am laser focused on three fundamental objectives: * Remain committed to our mission and our customers; * Take care of our workforce; * Actively address the issues related to how we execute our human resources activities and make sure that all BPA employees are aware of BPA's absolute commitment to a workplace free of retaliation,

38

Radon Monitoring Results BPA Residential Weatherization Program, Report Number 1.  

SciTech Connect

In October 1984, the Bonneville Power Administration (BPA) began offering free radon monitoring to participants of its regionwide Residential Weatherization Program. The purpose of the radon monitoring is to provide information to participating homeowners or consumers on the average radon concentrations within their residences. This radon concentration information and other information on indoor air quality (IAQ) is provided to assist homeowners on their decision to install ''house-tightening'' weatherization measures. This radon report will present background information on why BPA decided to offer radon monitoring, the procedures used for monitoring, the extent of BPA radon monitoring in the region, and results of this monitoring. Subsequent BPA radon monitoring reports will be produced on a quarterly basis which will include a brief narrative on the radon monitoring and provide a summary of the radon data received to date.

United States. Bonneville Power Administration.

1986-01-01T23:59:59.000Z

39

BPA FINAL Binding Arbitration policy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA FINAL Binding Arbitration policy BPA FINAL Binding Arbitration policy BPA FINAL Binding Arbitration policy Alternative dispute resolution (ADR) encompasses a variety of methods that parties may use to resolve disputes without litigation. Arbitration is a private, less formal process in which parties agree to submit a dispute to one or more impartial arbitrators who then render a decision or award. In non-binding arbitration a party is not required to accept the arbitrator's decision. In contrast, a decision or award in binding arbitration is final and subject to only very limited rights of appeal. See Federal Arbitration Act, 9 U.S.C. §§ 1-16 (FAA). Both types of arbitration can provide benefits to BPA, its customers, and other stakeholders including the public, such as greater flexibility, limited

40

FIA-12-0012 - In the Matter of Another Way BPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 - In the Matter of Another Way BPA 2 - In the Matter of Another Way BPA FIA-12-0012 - In the Matter of Another Way BPA OHA issued a decision denying FOIA Appeals filed by Another Way BPA, relating to a request which it filed for records regarding the I-5 Corridor Reinforcement Project. In March 2012, the DOE's Bonneville Power Administration issued three determinations in response to Another Way BPA's requests. In the determinations, BPA indicated that it located some documents responsive to Another Way BPA's requests and released the documents with information withheld pursuant to FOIA Exemptions 5 and 6. Another Way BPA appealed each determination, challenging the adequacy of BPA's searches, and the applicability of Exemption 5. On appeal, OHA determined that, although BPA's searches did not yield the volume of

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

FIA-12-0013 - In the Matter of Another Way BPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 - In the Matter of Another Way BPA 3 - In the Matter of Another Way BPA FIA-12-0013 - In the Matter of Another Way BPA OHA issued a decision denying FOIA Appeals filed by Another Way BPA, relating to a request which it filed for records regarding the I-5 Corridor Reinforcement Project. In March 2012, the DOE's Bonneville Power Administration issued three determinations in response to Another Way BPA's requests. In the determinations, BPA indicated that it located some documents responsive to Another Way BPA's requests and released the documents with information withheld pursuant to FOIA Exemptions 5 and 6. Another Way BPA appealed each determination, challenging the adequacy of BPA's searches, and the applicability of Exemption 5. On appeal, OHA determined that, although BPA's searches did not yield the volume of

42

FIA-12-0014 - In the Matter of Another Way BPA | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 - In the Matter of Another Way BPA 4 - In the Matter of Another Way BPA FIA-12-0014 - In the Matter of Another Way BPA OHA issued a decision denying FOIA Appeals filed by Another Way BPA, relating to a request which it filed for records regarding the I-5 Corridor Reinforcement Project. In March 2012, the DOE's Bonneville Power Administration issued three determinations in response to Another Way BPA's requests. In the determinations, BPA indicated that it located some documents responsive to Another Way BPA's requests and released the documents with information withheld pursuant to FOIA Exemptions 5 and 6. Another Way BPA appealed each determination, challenging the adequacy of BPA's searches, and the applicability of Exemption 5. On appeal, OHA determined that, although BPA's searches did not yield the volume of

43

WA_05_006_ABENGOA_BIOENERGY_CORPORATION_Waiver_of_Domestic_a...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06ABENGOABIOENERGYCORPORATIONWaiverofDomestica.pdf WA05006ABENGOABIOENERGYCORPORATIONWaiverofDomestica.pdf WA05006ABENGOABIOENERGYCORPORATIONWaiverofDomesti...

44

WA_97_009_DETROIT_DIESEL_CORPORATION_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09DETROITDIESELCORPORATIONWaiverofDomesticand.pdf WA97009DETROITDIESELCORPORATIONWaiverofDomesticand.pdf WA97009DETROITDIESELCORPORATIONWaiverofDomestica...

45

WA_97_010_DETROIT_DIESEL_CORPORATION_Waiver_of_Domestice_and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0DETROITDIESELCORPORATIONWaiverofDomesticeand.pdf WA97010DETROITDIESELCORPORATIONWaiverofDomesticeand.pdf WA97010DETROITDIESELCORPORATIONWaiverofDomesticea...

46

WA_03_043_GENERAL_ELECTRIC_POWER_SYSTEMS_Waiver_of_Domestic_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3043GENERALELECTRICPOWERSYSTEMSWaiverofDomestic.pdf WA03043GENERALELECTRICPOWERSYSTEMSWaiverofDomestic.pdf WA03043GENERALELECTRICPOWERSYSTEMSWaiverofDom...

47

WA_03_050_GENERAL_ELECTRIC__POWER_SYSTEMS_Waiver_of_Domestic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50GENERALELECTRICPOWERSYSTEMSWaiverofDomestic.pdf WA03050GENERALELECTRICPOWERSYSTEMSWaiverofDomestic.pdf WA03050GENERALELECTRICPOWERSYSTEMSWaiverofDomes...

48

WA_03_016_GENE_ELEC_HYBRID_POWER_GENERATION_SYSTEMS_Waiver_o...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home WA03016GENEELECHYBRIDPOWERGENERATIONSYSTEMSWaivero.pdf WA03016GENEELECHYBRIDPOWERGENERATIONSYSTEMS...

49

WA_00_007_COMBUSTION_ENGINEERING_INC_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07COMBUSTIONENGINEERINGINCWaiverofDomesticand.pdf WA00007COMBUSTIONENGINEERINGINCWaiverofDomesticand.pdf WA00007COMBUSTIONENGINEERINGINCWaiverofDomestica...

50

WA_1995_046_EASTMAN_CHEMICAL_COMPANY_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46EASTMANCHEMICALCOMPANYWaiverofDomesticand.pdf WA1995046EASTMANCHEMICALCOMPANYWaiverofDomesticand.pdf WA1995046EASTMANCHEMICALCOMPANYWaiverofDomesticand...

51

WA_1995_015_EASTMAN_CHEMICAL_COMPANY_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15EASTMANCHEMICALCOMPANYWaiverofDomesticand.pdf WA1995015EASTMANCHEMICALCOMPANYWaiverofDomesticand.pdf WA1995015EASTMANCHEMICALCOMPANYWaiverofDomesticand...

52

WA_05_022_DOW_CHEMICAL_COMPANY_Waiver_of_domestic_and_Foreig...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2DOWCHEMICALCOMPANYWaiverofdomesticandForeig.pdf WA05022DOWCHEMICALCOMPANYWaiverofdomesticandForeig.pdf WA05022DOWCHEMICALCOMPANYWaiverofdomesticandFore...

53

WA_04_057_CHEMICAL_RESEARCH_AND_LICENSING_CO_Waiver_of_Paten...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7CHEMICALRESEARCHANDLICENSINGCOWaiverofPaten.pdf WA04057CHEMICALRESEARCHANDLICENSINGCOWaiverofPaten.pdf WA04057CHEMICALRESEARCHANDLICENSINGCOWaiverofPat...

54

WA_02_042_GENERAL_MOTORS_POWER_TRAIN_DIV_Waiver_of_Domestic_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42GENERALMOTORSPOWERTRAINDIVWaiverofDomestic.pdf WA02042GENERALMOTORSPOWERTRAINDIVWaiverofDomestic.pdf WA02042GENERALMOTORSPOWERTRAINDIVWaiverofDomest...

55

WA_06_034_ENERGY_CONVERSION_DEVICES_INC_Waiver_of_Domestic_a...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06034ENERGYCONVERSIONDEVICESINCWaiverofDomestica.pdf WA06034ENERGYCONVERSIONDEVICESINCWaiverofDomestica.pdf WA06034ENERGYCONVERSIONDEVICESINCWaiverofDom...

56

WA_1993_028_ALLIANCE_ELECTRIC_COMPANY_Waiver_of_Domestic_and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2MARTINMARIETTACORPORATIONKNOWASGENERALDYNA.pdf WA1994013GENERALELECTRICCOMPANYCORPORATERESEARCHAND.pdf WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome...

57

WA_1995_026_CHEVRON_PRODUCTION_COMPNAY_Waiver_of_Domestic_an...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UCTIONCOMPNAYWaiverofDomestican.pdf More Documents & Publications WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome.pdf WA1993028ALLIANCEELECTRICCOMPANYWaiver...

58

WA_1994_012_MARTIN_MARIETTA_CORPORATION_KNOW_AS_GENERAL_DYNA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3GENERALELECTRICCOMPANYCORPORATERESEARCHAND.pdf WA1993028ALLIANCEELECTRICCOMPANYWaiverofDomesticand.pdf WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome...

59

WA_1994_001_TEXACO_EXPLORATION_AND_PRODUCTION_Waiver_of_Dome...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome.pdf WA1994001TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome.pdf WA1994001TEXACOEXPLORATIONANDPRODUCTIONWaiverofDom...

60

WA_1993_023_TEXACO_EXPLORATION_AND_PRODUCTION_Waiver_of_Dome...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome.pdf WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome.pdf WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDom...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

WA_97_018_INTERNATIONAL_FUEL_CELLS_CORPS_Waiver_of_Domestic_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7018INTERNATIONALFUELCELLSCORPSWaiverofDomestic.pdf WA97018INTERNATIONALFUELCELLSCORPSWaiverofDomestic.pdf WA97018INTERNATIONALFUELCELLSCORPSWaiverofDom...

62

WA_02_050_SPECIALIZED_TECHNOLOGY_RESOURCES_Waiver_of_Patent_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50SPECIALIZEDTECHNOLOGYRESOURCESWaiverofPatent.pdf WA02050SPECIALIZEDTECHNOLOGYRESOURCESWaiverofPatent.pdf WA02050SPECIALIZEDTECHNOLOGYRESOURCESWaiverofPate...

63

WA_04_076_CHEVRONTEXACO_TECHNOLOGY_VENTURES_Waiver_of_Patent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6CHEVRONTEXACOTECHNOLOGYVENTURESWaiverofPatent.pdf WA04076CHEVRONTEXACOTECHNOLOGYVENTURESWaiverofPatent.pdf WA04076CHEVRONTEXACOTECHNOLOGYVENTURESWaiverofPate...

64

WA_04_028_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_patent_Rights...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4028AIRPRODUCTSANDCHEMICALSWaiverofpatentRights.pdf WA04028AIRPRODUCTSANDCHEMICALSWaiverofpatentRights.pdf WA04028AIRPRODUCTSANDCHEMICALSWaiverofpatent...

65

WA_1994_021_ATLANTA_GAS_LIGHT_AND_ABSORBENT_RESEARCH_Waiver_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4021ATLANTAGASLIGHTANDABSORBENTRESEARCHWaiver.pdf WA1994021ATLANTAGASLIGHTANDABSORBENTRESEARCHWaiver.pdf WA1994021ATLANTAGASLIGHTANDABSORBENTRESEARCHWai...

66

WA_05_060_SHELL_SOLAR_INDUSTRIES_Waiver_of_Domestic_and_fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60SHELLSOLARINDUSTRIESWaiverofDomesticandfore.pdf WA05060SHELLSOLARINDUSTRIESWaiverofDomesticandfore.pdf WA05060SHELLSOLARINDUSTRIESWaiverofDomesticandf...

67

WA_1995_012_ENGELHARDT_INSTITUTE_OF_MOLECULAR_BIOLOGY_Waiver...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12ENGELHARDTINSTITUTEOFMOLECULARBIOLOGYWaiver.pdf WA1995012ENGELHARDTINSTITUTEOFMOLECULARBIOLOGYWaiver.pdf WA1995012ENGELHARDTINSTITUTEOFMOLECULARBIOLOGYWaive...

68

WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS Energy Efficiency and Conservation Block Grant Program Location: Tribe WA-TRIBE- STILLAGUAMISH TRIBE OF INDIANS WA American Recovery and Reinvestment Act: Proposed Action or Project Description The Stillaguamish Tribe proposes to expand its Stillaguamish Tribe Transit Services (STTS). For the past three years, the STTS has employed 14-passenger buses to transport clients to and from the tribal medical, dental, behavioral health and massage clinics. Often the demand-response requests that come to STTS are for one to three passengers at a time; therefore, funds are being requested to purchase a hybrid sedan to transport clients. Conditions: None Categorical Exclusion(s) Applied: A1, B1.32, B5.1 *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFR10 21

69

Secretary Chu Announces Progress on BPA Recovery Act Project | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Progress on BPA Recovery Act Project Progress on BPA Recovery Act Project Secretary Chu Announces Progress on BPA Recovery Act Project August 10, 2009 - 12:00am Addthis Richland, Wash. - With the goal of bringing new jobs and green power to the West, Energy Secretary Steven Chu today announced the start of the McNary-John Day transmission project in Washington and Oregon, which will be funded by $343 million from the American Recovery and Reinvestment Act. The project is expected to deliver almost 600 megawatts of clean, renewable wind energy to homes and business across the West. "These Recovery Act funds are putting people to work today to build the infrastructure that will be vital to our economy in the future," said U.S. Energy Secretary Steven Chu. "By integrating renewable energy sources onto

70

BPA experience in the direct measurement of power system dynamics  

Science Conference Proceedings (OSTI)

Sustained growth of a large power system tends to make the model-based planning of system expansions and operations increasingly difficult. This paper presents a BPA perspective on procedures for extracting supplemental information for the power system itself. These procedures involve disturbance analysis, ambient measurements, and direct tests. Results shown for the western U.S. power system include a response model derived from a recent test energization of BPA's 1400 MW dynamic brake. The model construction illustrated combined use of Fourier analysis, Prony analysis, and optimal fitting to measured frequency response.

Hauer, J.F. (Bonneville Power Administration, Portland, OR (United States))

1990-01-01T23:59:59.000Z

71

BPA Turns 75: A Look Back and a Look Ahead | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA Turns 75: A Look Back and a Look Ahead BPA Turns 75: A Look Back and a Look Ahead BPA Turns 75: A Look Back and a Look Ahead September 28, 2012 - 11:59am Addthis To commemorate what BPA considers a 75-year partnership with the Columbia River, which is the cornerstone of BPA's relationship with the people and utilities of the Northwest, BPA releases the first video of a series detailing its history. Teresa Waugh Public Affairs Specialist, Bonneville Power Administration What is BPA? BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin in the Pacific Northwest. BPA's service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming. Seventy five years ago last month, Franklin D. Roosevelt signed the

72

Assessment of the Geothermal Potential Within the BPA Marketing Area.  

DOE Green Energy (OSTI)

The potential of geothermal energy is estimated that can be used for direct heat applications and electrical power generation within the Bonneville Power Administration (BPA) marketing area. The BPA marketing area includes three principal states of Oregon, Washington, and Idaho and portions of California, Montana, Wyoming, Nevada, and Utah bordering on these three states. This area covers approximately 384,000 square miles and has an estimated population of 6,760,000. The total electrical geothermal potential within this marketing area is 4077 MW/sub e/ from hydrothermal resources and 16,000 MW/sub e/ from igneous systems, whereas the total thermal (wellhead) potential is 16.15 x 10/sup 15/ Btu/y. Approximately 200 geothermal resource sites were initially identified within the BPA marketing area. This number was then reduced to about 100 sites thought to be the most promising for development by the year 2000. These 100 sites, due to load area overlap, were grouped into 53 composite sites; 21-3/4 within BPA preference customer areas and 31-1/4 within nonpreference customer areas. The geothermal resource potential was then estimated for high-temperature (> 302/sup 0/F = 150/sup 0/C), intermediate-temperature (194 to 302/sup 0/F = 90 to 150/sup 0/C), and low-temperature (< 194/sup 0/F = 90/sup 0/C) resources.

Lund, John W.; Allen, Eliot D.

1980-07-01T23:59:59.000Z

73

WA_05_046_GENERAL_MOTORS_CORPORATION_Waiver_of_domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications WA04070GENERALMOTORSCORPORATIONWaiverofDomesticand.pdf WA02042GENERALMOTORSPOWERTRAINDIVWaiverofDomestic.pdf Advance Patent Waiver W(A)2010-031...

74

WA_01_023_BP_NORTH_AMERICAN_Waiver_of_Domestic_and_Foreign_I...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications Advance Patent Waiver W(A)2012-002 Advance Patent Waiver W(A)2012-016 WA1993023TEXACOEXPLORATIONANDPRODUCTIONWaiverofDome...

75

WA_01_029_GENERAL_ELECTRIC_R_and_D_Waiver_of_Patent_Rights_under...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA01029GENERALELECTRICRandDWaiverofPatentRightsunder.pdf WA01029GENERALELECTRICRandDWaiverofPatentRightsunder.pdf WA01029GENERALELECTRICRandDWaiver...

76

BPA GUIDANCE ON THE USE OF BINDING ARBITRATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION'S BONNEVILLE POWER ADMINISTRATION'S GUIDANCE ON THE USE OF BINDING ARBITRATION FOR BPA CONTRACTS Introduction Alternative dispute resolution (ADR) encompasses a variety of methods that parties may use to resolve disputes without litigation. Arbitration is a private, less formal process in which parties agree to submit a dispute to one or more impartial arbitrators who then render a decision or award. In non-binding arbitration a party is not required to accept the arbitrator's decision. In contrast, a decision or award in binding arbitration is final and subject to only very limited rights of appeal. See Federal Arbitration Act, 9 U.S.C. §§ 1-16 (FAA). Both types of arbitration can provide benefits to BPA, its customers, and other stakeholders including the public, such as greater flexibility, limited discovery, a

77

BPA GUIDANCE ON THE USE OF BINDING ARBITRATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION'S BONNEVILLE POWER ADMINISTRATION'S GUIDANCE ON THE USE OF BINDING ARBITRATION FOR BPA CONTRACTS Introduction Alternative dispute resolution (ADR) encompasses a variety of methods that parties may use to resolve disputes without litigation. Arbitration is a private, less formal process in which parties agree to submit a dispute to one or more impartial arbitrators who then render a decision or award. In non-binding arbitration a party is not required to accept the arbitrator's decision. In contrast, a decision or award in binding arbitration is final and subject to only very limited rights of appeal. See Federal Arbitration Act, 9 U.S.C. §§ 1-16 (FAA). Both types of arbitration can provide benefits to BPA, its customers, and other stakeholders including the public, such as greater flexibility, limited discovery, a

78

Microsoft Word - BPA DEIS TOC Abstract Summary.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement July 2010 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Draft Environmental Impact Statement Bonneville Power Administration July 2010 Abstract DEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

79

Microsoft Word - BPA PFEIS Cover Abstract.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement February 2011 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration February 2011 FEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

80

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 9 9 7 1 9 9 7 B PA / L O W E R VA L L E Y T R A N S M I S S I O N P R O J E C T Final Environmental Impact Statement DOE/EIS-0267 J U N E 1 9 9 8 Bonneville Power Administration PO Box 3621 Portland, Oregon 97208-3621 DOE/BP-3067 JUNE 1998 450 Final Environmental Impact Statement BPA/Lower Valley Transmission Project Bonneville Power Administration U.S. Department of Energy and Forest Service U.S. Department of Agriculture June 1998 Table of Contents - i Table of Contents Summary ............................................................................................................................ S-1 S.1 Purpose and Need For Action ................................................................................................ S-1 S.1.1 BPA ...............................................................................................................................................

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

12-10-09_Final_Testimony_(Mainzer)_(BPA).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT OF STATEMENT OF ELLIOT MAINZER EXECUTIVE VICE PRESIDENT CORPORATE STRATEGY BONNEVILLE POWER ADMINISTRATION UNITED STATES DEPARTMENT OF ENERGY BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE HEARING ON THE ROLE OF GRID-SCALE ENERGY STORAGE IN MEETING OUR ENERGY AND CLIMATE GOALS DECEMBER 10, 2009 Thank you, Mr. Chairman. My name is Elliot Mainzer and I am the Executive Vice President for Corporate Strategy for the Bonneville Power Administration (BPA). I am pleased to be here today to describe the significance of BPA's efforts to facilitate wind energy into the Western transmission system and the role storage technologies could play as one tool in the suite of initiatives we are developing to improve our ability to integrate

82

To: ALLBPA Subject: Thank You Fellow BPA Employees:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2013 8:11 AM 19, 2013 8:11 AM To: ALLBPA Subject: Thank You Fellow BPA Employees: I wanted to thank you all personally for your patience and professionalism during the past few days. As you may know, as a result of an inspection of BPA hiring practices, the Department of Energy Inspector General's Office posted a "Management Alert" which described the IG Office interim results and recommendations, as well as DOE's management response, which described actions DOE has taken. For those of you who have not seen the document, it is available at this link. Although the IG is continuing to audit the matter, the Management Alert comes on the heels of an

83

Changes related to "Category:Seattle, WA" | Open Energy Information  

Open Energy Info (EERE)

page Share this page on Facebook icon Twitter icon Changes related to "Category:Seattle, WA" Category:Seattle, WA Jump to: navigation, search This is a list of changes...

84

RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA Dept. of Commerce STATE: WA WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI - Demand Energy - Energy Storage System Tied to Solar on Commercial Facility TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000052 DE-EEOOO0139 GFO-o000139-031 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

85

WA_1994_027_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreig...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4027FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA1994027FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA1994027FORDMOTORCOMPANYWaiverofDomesticandFo...

86

WA_99_015_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreign_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

99015FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA99015FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA99015FORDMOTORCOMPANYWaiverofDomesticandF...

87

WA_1993_032_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreig...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA1993032FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA1993032FORDMOTORCOMPANYWaiverofDomesticandForei...

88

WA_1993_004_SOLAR_TURBINE_INC_Waiver_of_Domestic_and_Foreign...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04SOLARTURBINEINCWaiverofDomesticandForeign.pdf WA1993004SOLARTURBINEINCWaiverofDomesticandForeign.pdf WA1993004SOLARTURBINEINCWaiverofDomesticandForeig...

89

WA_00_012_3M_COMPANY_Waiver_of_Domestic_and_Foreign_Rights_u...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DomesticandForeignRightsu.pdf More Documents & Publications WA99008DUPONTSUPERCONDUCTIVITYWaiverofUSandForeign.pdf WA03046INTERMAGNETICSGENERALCORPWaiverofDo...

90

WA_99_008_DUPONT_SUPERCONDUCTIVITY_Waiver_of_US_and_Foreign_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9008DUPONTSUPERCONDUCTIVITYWaiverofUSandForeign.pdf WA99008DUPONTSUPERCONDUCTIVITYWaiverofUSandForeign.pdf WA99008DUPONTSUPERCONDUCTIVITYWaiverofUSandFo...

91

WA_07_012_BOEING_COMPANY_Waiver_of_Domestic_and_Foreign_Pate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THEBOEINGCOMPANYWaiverofdomesticandForeign.pdf WA01007SOLARTURBINESWaiverofDomesticandForeignpate.pdf WA03001CHEVRONTEXACOWaiverofDomesticandForeignPate...

92

WA_04-001_AMENDED_SILICATES_Waiver_of_Domestic_and_Foreign_I...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA00001PRAXAIRINCWaiverofDomesticandForeignInventi.pdf WA03001CHEVRONTEXACOWaiverofDomesticandForeignPate...

93

WA_03_015_HYBRID_POWER_GENERATION_SYSTEMS_Waiver_of_Domestic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home WA03015HYBRIDPOWERGENERATIONSYSTEMSWaiverofDomestic.pdf WA03015HYBRIDPOWERGENERATIONSYSTEMS...

94

WA_07_022_SIEMENS_POWER_GENERATION_INC_Waiver_of_Patent_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA07022SIEMENSPOWERGENERATIONINCWaiverofPatentRigh.pdf WA07022SIEMENSPOWERGENERATIONINCWaiv...

95

WA_1994_022_CUMMINS_POWER_GENERATION_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA1994022CUMMINSPOWERGENERATIONWaiverofDomesticand.pdf WA1994022CUMMINSPOWERGENERATIONWaivero...

96

WA_03_017_HYBRID_POWER_GENERATION_SYSTEMS_Waiver_of_Domestic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home WA03017HYBRIDPOWERGENERATIONSYSTEMSWaiverofDomestic.pdf WA03017HYBRIDPOWERGENERATIONSYSTEMS...

97

WA_1993_006_CUMMINS_POWER_GENERATION_INC_Waiver_of_Domestic_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA1993006CUMMINSPOWERGENERATIONINCWaiverofDomestic.pdf WA1993006CUMMINSPOWERGENERATIONINCWaiv...

98

WA_98_006_WESTINGHOUSE_POWER_GENERATION_A_FORMER_DIVISION_OF...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA98006WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98006WESTINGHOUSEPOWERGENERATIONAFORMER...

99

WA_04_017_CUMMINS_POWER_GENERATION_Waiver_of_Domestic_and_Fo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA04017CUMMINSPOWERGENERATIONWaiverofDomesticandFo.pdf WA04017CUMMINSPOWERGENERATIONWaivero...

100

WA_1995_035_ABB_POWER_GENERATION_INC_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home WA1995035ABBPOWERGENERATIONINCWaiverofDomesticand.pdf WA1995035ABBPOWERGENERATIONINCWaiv...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

WA_04_080_HYBRID_POWER_GENERATION_SYSTEMS_Waiver_of_Patent_R...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home WA04080HYBRIDPOWERGENERATIONSYSTEMSWaiverofPatentR.pdf WA04080HYBRIDPOWERGENERATIONSYSTEMS...

102

WA_98_005_WESTINGHOUSE_POWER_GENERATION_A_FORMER_DIVISION_OF...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home WA98005WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98005WESTINGHOUSEPOWERGENERATIONAFORMER...

103

WA_03_014_HYBRID_POWER_GENERATION_SYSTEMS_Waiver_of_Domestic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home WA03014HYBRIDPOWERGENERATIONSYSTEMSWaiverofDomestic.pdf WA03014HYBRIDPOWERGENERATIONSYSTEMS...

104

WA_02_011_BP_AMOCO_CHEMICAL_CO_Waiver_of_Domestic_and_Foreig...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1BPAMOCOCHEMICALCOWaiverofDomesticandForeig.pdf WA02011BPAMOCOCHEMICALCOWaiverofDomesticandForeig.pdf WA02011BPAMOCOCHEMICALCOWaiverofDomesticandFore...

105

WA_1993_036_DOW_CHEMICAL_COMPANY_Waiver_of_Domestic_and_Fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36DOWCHEMICALCOMPANYWaiverofDomesticandFore.pdf WA1993036DOWCHEMICALCOMPANYWaiverofDomesticandFore.pdf WA1993036DOWCHEMICALCOMPANYWaiverofDomesticandFor...

106

WA_01_032_DOW_CHEMICAL_Waiver_of_Domestic_and_foreign_Patent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1032DOWCHEMICALWaiverofDomesticandforeignPatent.pdf WA01032DOWCHEMICALWaiverofDomesticandforeignPatent.pdf WA01032DOWCHEMICALWaiverofDomesticandforeign...

107

WA_06_019_NALCO_CHEMICAL_COMPANY_Waiver_of_Domestic_and_Fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19NALCOCHEMICALCOMPANYWaiverofDomesticandFore.pdf WA06019NALCOCHEMICALCOMPANYWaiverofDomesticandFore.pdf WA06019NALCOCHEMICALCOMPANYWaiverofDomesticandF...

108

WA_03_033_GE_WIND_ENERGY_LLC_Waiver_of_Domestic_and_Foreign_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3GEWINDENERGYLLCWaiverofDomesticandForeign.pdf WA03033GEWINDENERGYLLCWaiverofDomesticandForeign.pdf WA03033GEWINDENERGYLLCWaiverofDomesticandForeig...

109

WA_03_013_ANADARKO_PETROLEUM_Waiver_of_Domestic_and_Foreign_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3013ANADARKOPETROLEUMWaiverofDomesticandForeign.pdf WA03013ANADARKOPETROLEUMWaiverofDomesticandForeign.pdf WA03013ANADARKOPETROLEUMWaiverofDomesticandFo...

110

WA_-01_001_PHILLIPS_PETROLEUM_Waiver_of_Domestic_and_Foreign...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-01001PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA-01001PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA-01001PHILLIPSPETROLEUMWaiverofDomesticand...

111

WA_04_036_HRL_Laboratories_LLC_.Waiver_pof_dDomestic_fand_Fo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9GENERALMOTORSCORPWaiverofDomesticandForeign.pdf WA02042GENERALMOTORSPOWERTRAINDIVWaiverofDomestic.pdf WA03044CATERPILLARINCWaiverofDomesticandForeignR...

112

WA_04_026_ENERGY_CONVERSION_DEVICES_Waiver_of_Domestic_and_F...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6ENERGYCONVERSIONDEVICESWaiverofDomesticandF.pdf WA04026ENERGYCONVERSIONDEVICESWaiverofDomesticandF.pdf WA04026ENERGYCONVERSIONDEVICESWaiverofDomesticand...

113

WA_1993_018_CONSOLIDATION_COAL_CO_Waiver_of_Domestic_and_For...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18CONSOLIDATIONCOALCOWaiverofDomesticandFor.pdf WA1993018CONSOLIDATIONCOALCOWaiverofDomesticandFor.pdf WA1993018CONSOLIDATIONCOALCOWaiverofDomesticandFo...

114

WA_04_034_NUVERA_FUEL_CELLS_INC_Waiver_of_Domestic_and_Forei...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04034NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04034NUVERAFUELCELLSINCWaiverofDomesticandFor...

115

WA_04_041_NUVERA_FUEL_CELLS_INC_Waiver_of_Domestic_and_Forei...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04041NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04041NUVERAFUELCELLSINCWaiverofDomesticandFo...

116

WA_03_054_HEIL_TRAILER_INTERNATIONAL_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADVANCEDTECHNLOGYMATERIALSWaiverofDomestican.pdf WA04054ECRINTERNATIONALWaiverofPatentRightstoInven.pdf WA02035BPSOLARINTERNATIONALWaiverofDomesticandFore...

117

WA_04_055_BALLARD_POWER_SYSTEMS_CORP_Waiver_of_Domestic_and_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA99014UNITEDSOLARSYSTEMSCORPWaiverofDomesticandF.pdf...

118

WA_04_083_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04083AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04083AIRPRODUCTSANDCHEMICALSWaiverofPatentRigh...

119

WA_00_027_HONEYWELL_POWER_SYSTEMS_Waiver_of_Patent_Rights.pdf...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7HONEYWELLPOWERSYSTEMSWaiverofPatentRights.pdf WA00027HONEYWELLPOWERSYSTEMSWaiverofPatentRights.pdf WA00027HONEYWELLPOWERSYSTEMSWaiverofPatentRights.pdf...

120

WA_05_062_UNITED_TECHNOLOGIES_CORPORATION_Waiver_of_Patent_R...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5062UNITEDTECHNOLOGIESCORPORATIONWaiverofPatentR.pdf WA05062UNITEDTECHNOLOGIESCORPORATIONWaiverofPatentR.pdf WA05062UNITEDTECHNOLOGIESCORPORATIONWaiverofPa...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

WA_04_082_DELPHI_AUTOMOTIVE_SYSTEMS_Waiver_of_Patent_Rights_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4082DELPHIAUTOMOTIVESYSTEMSWaiverofPatentRights.pdf WA04082DELPHIAUTOMOTIVESYSTEMSWaiverofPatentRights.pdf WA04082DELPHIAUTOMOTIVESYSTEMSWaiverofPatentR...

122

WA_02_015_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Patent_Ri...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5AIRPRODUCTSANDCHEMICALSINCWaiverofPatentRi.pdf WA02015AIRPRODUCTSANDCHEMICALSINCWaiverofPatentRi.pdf WA02015AIRPRODUCTSANDCHEMICALSINCWaiverofPatent...

123

WA_07_040_GRAFTECH_INTERNATIONAL_LTD_Waiver_of_Patent_Rights...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40GRAFTECHINTERNATIONALLTDWaiverofPatentRights.pdf WA07040GRAFTECHINTERNATIONALLTDWaiverofPatentRights.pdf WA07040GRAFTECHINTERNATIONALLTDWaiverofPatentRig...

124

WA_06_032_HONEYWELL_TURBO_TECHNOLOGIES_Waiver_of_Patent_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2HONEYWELLTURBOTECHNOLOGIESWaiverofPatentRigh.pdf WA06032HONEYWELLTURBOTECHNOLOGIESWaiverofPatentRigh.pdf WA06032HONEYWELLTURBOTECHNOLOGIESWaiverofPatentRi...

125

WA_04_040_HONEYWELL_INTERNATIONAL_INC_Waiver_of_Patent_Right...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0HONEYWELLINTERNATIONALINCWaiverofPatentRight.pdf WA04040HONEYWELLINTERNATIONALINCWaiverofPatentRight.pdf WA04040HONEYWELLINTERNATIONALINCWaiverofPatentRig...

126

WA_06_005_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA06005AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA06005AIRPRODUCTSANDCHEMICALSWaiverofPatentRigh...

127

WA_04_012_MACK_TRUCK_INC_Waiver_of_patent_Rights_under_NREL_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2MACKTRUCKINCWaiverofpatentRightsunderNREL.pdf WA04012MACKTRUCKINCWaiverofpatentRightsunderNREL.pdf WA04012MACKTRUCKINCWaiverofpatentRightsunderNRE...

128

WA_04_025_AIR_LIQUIDE_AMERICA_Waiver_of_Patent_Rights_under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25AIRLIQUIDEAMERICAWaiverofPatentRightsunder.pdf WA04025AIRLIQUIDEAMERICAWaiverofPatentRightsunder.pdf WA04025AIRLIQUIDEAMERICAWaiverofPatentRightsund...

129

WA_04_043_UNITED_TECHNOLOGIES_CORP_Waiver_of_Patent_Rights_t...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

43UNITEDTECHNOLOGIESCORPWaiverofPatentRightst.pdf WA04043UNITEDTECHNOLOGIESCORPWaiverofPatentRightst.pdf WA04043UNITEDTECHNOLOGIESCORPWaiverofPatentRight...

130

WA_05_037_UNITED_TECHNOLOGIES_CORP_Waiver_of_Patent_Rights_t...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7UNITEDTECHNOLOGIESCORPWaiverofPatentRightst.pdf WA05037UNITEDTECHNOLOGIESCORPWaiverofPatentRightst.pdf WA05037UNITEDTECHNOLOGIESCORPWaiverofPatentRights...

131

WA_05_033_EASTMAN_CHEMICAL_COMPANY_Waiver_of_Patent_Rights_t...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33EASTMANCHEMICALCOMPANYWaiverofPatentRightst.pdf WA05033EASTMANCHEMICALCOMPANYWaiverofPatentRightst.pdf WA05033EASTMANCHEMICALCOMPANYWaiverofPatentRight...

132

WA_04_063_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRigh...

133

WA_01_005__PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_patent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5PRAXAIRINCWaiverofDomesticandForeignpatent.pdf WA01005PRAXAIRINCWaiverofDomesticandForeignpatent.pdf WA01005PRAXAIRINCWaiverofDomesticandForeignpate...

134

WA_05_029_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA05029AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA05029AIRPRODUCTSANDCHEMICALSWaiverofPatentRigh...

135

WA_05_025_GE_NUCLEAR_ENERGY_Waiver_of_patent_Rights_Under_a_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5025GENUCLEARENERGYWaiverofpatentRightsUndera.pdf WA05025GENUCLEARENERGYWaiverofpatentRightsUndera.pdf WA05025GENUCLEARENERGYWaiverofpatentRightsUn...

136

WA_03_048_AMERICAN_SUPERCONDUCTOR_CORP_Waiver_of_Patent_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48AMERICANSUPERCONDUCTORCORPWaiverofPatentRigh.pdf WA03048AMERICANSUPERCONDUCTORCORPWaiverofPatentRigh.pdf WA03048AMERICANSUPERCONDUCTORCORPWaiverofPatentR...

137

WA_03_021_DELPHI_AUTOMOTIVE_SYSTEMS_Waiver_of_Patent_Rights_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1DELPHIAUTOMOTIVESYSTEMSWaiverofPatentRights.pdf WA03021DELPHIAUTOMOTIVESYSTEMSWaiverofPatentRights.pdf WA03021DELPHIAUTOMOTIVESYSTEMSWaiverofPatentRight...

138

WA_06_033_PARKER_HANNIFIN_CORPORATION_Waiver_of_Patent_Right...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3PARKERHANNIFINCORPORATIONWaiverofPatentRight.pdf WA06033PARKERHANNIFINCORPORATIONWaiverofPatentRight.pdf WA06033PARKERHANNIFINCORPORATIONWaiverofPatentRig...

139

WA_07_015_UNITED_TECHNOLOGIES_CORP_Waiver_of_Patent_Rights_t...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15UNITEDTECHNOLOGIESCORPWaiverofPatentRightst.pdf WA07015UNITEDTECHNOLOGIESCORPWaiverofPatentRightst.pdf WA07015UNITEDTECHNOLOGIESCORPWaiverofPatentRight...

140

WA_04_072_UNITED_TECHNOLOGIES_CORP_Waiverof_Patent_Rights_to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2UNITEDTECHNOLOGIESCORPWaiverofPatentRightsto.pdf WA04072UNITEDTECHNOLOGIESCORPWaiverofPatentRightsto.pdf WA04072UNITEDTECHNOLOGIESCORPWaiverofPatentRights...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

WA_1995_047_BLACK_CLAWSON_COMPANY_Waiver_of_Domestic_and_For...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7BLACKCLAWSONCOMPANYWaiverofDomesticandFor.pdf WA1995047BLACKCLAWSONCOMPANYWaiverofDomesticandFor.pdf WA1995047BLACKCLAWSONCOMPANYWaiverofDomesticandFor...

142

WA_98_020_THERMO_BLACK_CLAWSON_INC_Waiver_of_Domestic_and_Fo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0THERMOBLACKCLAWSONINCWaiverofDomesticandFo.pdf WA98020THERMOBLACKCLAWSONINCWaiverofDomesticandFo.pdf WA98020THERMOBLACKCLAWSONINCWaiverofDomesticand...

143

WA_01_014_VOITH_FABRICS_APPLETON_Waiver_of_Domestic_and_Fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1014VOITHFABRICSAPPLETONWaiverofDomesticandFore.pdf WA01014VOITHFABRICSAPPLETONWaiverofDomesticandFore.pdf WA01014VOITHFABRICSAPPLETONWaiverofDomestican...

144

WA_98_019_SIEMENS_SOLAR_INDUSTRIES_Waiver_of_Domestic_and_Fo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8019SIEMENSSOLARINDUSTRIESWaiverofDomesticandFo.pdf WA98019SIEMENSSOLARINDUSTRIESWaiverofDomesticandFo.pdf WA98019SIEMENSSOLARINDUSTRIESWaiverofDomestic...

145

WA_1995_030_GOLDEN_PHOTON_INC_Waiver_of_Domestic_and_Foreign...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30GOLDENPHOTONINCWaiverofDomesticandForeign.pdf WA1995030GOLDENPHOTONINCWaiverofDomesticandForeign.pdf WA1995030GOLDENPHOTONINCWaiverofDomesticandForeig...

146

WA_05_059_SHELL_SOLAR_INDUSTRIES_LP_Waiver_of_Domestic_and_F...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

59SHELLSOLARINDUSTRIESLPWaiverofDomesticandF.pdf WA05059SHELLSOLARINDUSTRIESLPWaiverofDomesticandF.pdf WA05059SHELLSOLARINDUSTRIESLPWaiverofDomestican...

147

WA_1995_002_SIEMENS_SOLAR_INDUSTRIES_Waiver_of_US_and_Foreig...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02SIEMENSSOLARINDUSTRIESWaiverofUSandForeig.pdf WA1995002SIEMENSSOLARINDUSTRIESWaiverofUSandForeig.pdf WA1995002SIEMENSSOLARINDUSTRIESWaiverofUSandForei...

148

WA_00_028_LOUISIANA_PACIFIC_CORP_Waiver_of_Domestic_and_Fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0028LOUISIANAPACIFICCORPWaiverofDomesticandFore.pdf WA00028LOUISIANAPACIFICCORPWaiverofDomesticandFore.pdf WA00028LOUISIANAPACIFICCORPWaiverofDomestican...

149

WA_03_010_SHELL_SOLAR_INDUSTRIES_Waiver_of_Domestic_and_Fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10SHELLSOLARINDUSTRIESWaiverofDomesticandFore.pdf WA03010SHELLSOLARINDUSTRIESWaiverofDomesticandFore.pdf WA03010SHELLSOLARINDUSTRIESWaiverofDomesticandF...

150

WA_98_008_GENERAL_ELECTRIC_COMPANY_Waiver_Under_a_Subcontrac...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA98008GENERALELECTRICCOMPANYWaiverUnderaSubcontrac.pdf WA98008GENERALELECTRICCOMPANYWaiverUnderaSubcontrac.pdf More Documents & Publications...

151

WA_01_019_GENERAL_ELECTRIC_CORP_Waiver_of_Domestic_and_Forei...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA01019GENERALELECTRICCORPWaiverofDomesticandForei.pdf WA01019GENERALELECTRICCORPWaiverofDomesticandForei.pdf More Documents & Publications...

152

WA_04_020_GENERAL_ELECTRIC_Waiver_of_Domestic_and_Foreign_In...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WA04020GENERALELECTRICWaiverofDomesticandForeignIn.pdf WA04020GENERALELECTRICWaiverofDomesticandForeignIn.pdf More Documents & Publications...

153

WA_03_019_GENERAL_MOTORS_CORP_Waiver_of_Domestic_and_Foreign...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SCORPWaiverofDomesticandForeign.pdf More Documents & Publications WA01019GENERALELECTRICCORPWaiverofDomesticandForei.pdf WA1993020GENERALMOTORSWaiverofDomest...

154

WA_04_075_VARIAN_MEDICAL_SYSTEMS_Waiver_of_Domestic_and_Fore...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75VARIANMEDICALSYSTEMSWaiverofDomesticandFore.pdf WA04075VARIANMEDICALSYSTEMSWaiverofDomesticandFore.pdf WA04075VARIANMEDICALSYSTEMSWaiverofDomesticandF...

155

WA_1993_041_ROCKETDYNE_AND_LLNL_Waiver_of_the_Governments_U.pdf...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pd...

156

WA_97_027_GENERAL_ATOMICS__CORPORATION_Waiver_of_Domestic_an...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EDSOLARSYSTEMSCORPWaiverofDomesticandF.pdf WA01034INGERSOLL-RANDENERGYSYSTEMSWaiverofDomestica.pdf WA00003DUKESOLARENERGYWaiverofDomesticandForeignP.pdf...

157

BayWa Group | Open Energy Information  

Open Energy Info (EERE)

BayWa Group BayWa Group Jump to: navigation, search Name BayWa Group Place Munich, Germany Zip 81925 Sector Services, Solar Product Germany-based company with international operations specialised in wholesale and retail and in providing services. The company is also active in the biofuel and solar sectors. Coordinates 48.136415°, 11.577531° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.136415,"lon":11.577531,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

158

BPA Wins Platts Global Energy Award for Grid Optimization | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BPA Wins Platts Global Energy Award for Grid Optimization BPA Wins Platts Global Energy Award for Grid Optimization BPA Wins Platts Global Energy Award for Grid Optimization December 18, 2013 - 2:25pm Addthis Platts awarded the Bonneville Power Administration (BPA) a Global Energy Award for grid optimization on December 12 in New York City for its development of a synchrophasor network. BPA is part of the Recovery Act-funded Western Interconnection Synchrophasor Program, in which 19 utilities have partnered with the Department of Energy to provide real-time visibility of the entire western power system that covers 14 states, two Canadian provinces and a portion of the Baja Peninsula in Mexico. Through a dedicated, secure network provided by Western Interconnection Synchrophasor Program, BPA is sharing synchrophasor data with 10 other utilities,

159

BPA Regional Science Bowl - High School Edition | U.S. DOE Office...  

Office of Science (SC) Website

Oregon Regions BPA Regional Science Bowl - High School Edition National Science Bowl (NSB) NSB Home About NSB High School High School Students High School Coaches High School...

160

BPA Regional Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Oregon Regions BPA Regional Science Bowl National Science Bowl (NSB) NSB Home About NSB High School Middle School Middle School Students Middle School Coaches Middle School...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Analysis of the methodology used to incorporate price-induced conservation into BPA's planning process  

Science Conference Proceedings (OSTI)

Bonneville Power Administration (BPA) is charged with the responsibility of planning how the electricity requirements of the BPA region may be met at a minimal cost. As part of this effort, electricity demand is forecast for the region over a twenty-year time horizon and the most efficient mix of resources that may be utilized to meet the forecasted electricity demand is determined by use of BPA's Least Cost Mix Model (LCMM). BPA considers conservation as a resource that may be utilized to meet future energy demand, and estimates supply curves for conservation which are sent to the LCMM.

Dinan, T.M.

1986-07-01T23:59:59.000Z

162

BLAINE LIBRARY READING LIST  

E-Print Network (OSTI)

for her friends. Henry, Marguerite. Misty of Chincoteague Misty begins her life as a wild descendant is adopted by the loving Beebe family. This is the first of several stories about Misty. This author has to be? Shang, Wendy. The Great Wall of Lucy Wu Lucy Wu loves her friends and playing basketball. She

Pritchard, Jonathan

163

,"Sumas, WA Natural Gas Pipeline Imports From Canada (MMcf)"  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Sumas, WA Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2012 ,"Release Date:","172014" ,"Next...

164

GNA Cliffs BPA Record of Decision (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATOR'S RECORD OF DECISION ADMINISTRATOR'S RECORD OF DECISION GNA Cliffs Energy Project Record of Decision INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from GNA Energy, LLC, (GNA)-a 300-megawatt (MW) natural-gas-fired, combined- cycle, combustion-turbine power generation project-into the Federal Columbia River Transmission System (FCRTS). This project, the Cliffs Energy Project (CE Project), is 0.5 miles west of the Goldendale Aluminum Company aluminum smelter just off State Route 14 in Klickitat County, Washington. It is one of many proposed generation projects currently being considered for integration into the FCRTS. Power generated at the CE Project will be available for purchase in the wholesale power market.

165

Superconducting magnetic energy storage for BPA transmission-line stabilization  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) operates the electrical transmission system that joins the Pacific Northwest with southern California. A 30 MJ (8.4 kWh) Superconducting Magnetic Energy Storage (SMES) unit with a 10 MW converter is being installed at the Tacoma Substation to provide system damping for low frequency oscillations of 0.35 Hz. The integrated system status is described and reviewed. Components included in the system are the superconducting coil, seismically mounted in an epoxy fiberglass nonconducting dewar; a helium refrigerator; a heat rejection subsystem; a high pressure gas recovery subsystem; a liquid nitrogen trailer; the converter with power transformers and switchgear; and a computer system for remote microwave link operation of the SMES unit.

Rogers, J.D.; Barron, M.H.; Boenig, H.J.; Criscuolo, A.L.; Dean, J.W.; Schermer, R.I.

1982-01-01T23:59:59.000Z

166

Fourth Annual SECA Meeting - Seattle, WA  

NLE Websites -- All DOE Office Websites (Extended Search)

Fourth Annual SECA Meeting - Seattle, WA Fourth Annual SECA Meeting - Seattle, WA April 15-16, 2003 Table of Contents Disclaimer Papers and Presentations Expanded Applications of SECA Fuel Cells SECA Industrial Team Reports Military Applications of Fuel Cells Technology Highlights Environmental Considerations Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government or any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

167

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration  

E-Print Network (OSTI)

Re: BPA FY 07-09 Project Proposal #200711200 Teanaway Watershed Protection and Restoration Kittitas draft province recommendations). The conservation easements acquisition costs qualify for funding by BPA as a Capital investment, as indicated in the Project Narrative on page 8. Proposed Project Funding Allocation

168

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

169

Hanford, WA Selected as Plutonium Production Facility | National Nuclear  

National Nuclear Security Administration (NNSA)

Hanford, WA Selected as Plutonium Production Facility | National Nuclear Hanford, WA Selected as Plutonium Production Facility | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Hanford, WA Selected as Plutonium Production Facility Hanford, WA Selected as Plutonium Production Facility January 16, 1943 Hanford, WA

170

RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk Dairy Anaerobic Digester  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of5 of5 RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk Dairy Anaerobic Digester TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-EE0000139 GF0-10-604 Based on my review oftbe information concerning the proposed action, as NEPA CompUance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: cx, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

171

WA_00_013_GENECOR_INTERNATIONAL_Waiver_of_US_Competitiveness...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications WA01008NOVOZYMEBIOTECHWaiverofDomesticandForeignPa.pdf WA05006ABENGOABIOENERGYCORPORATIONWaiverofDomestica.pdf Class Patent Waiver W(C)2012-004...

172

WA_01-012_DETROIT_DIESEL_Waiver_of_Domestic_and_Foreign_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-012DETROITDIESELWaiverofDomesticandForeignRigh.pdf WA01-012DETROITDIESELWaiverofDomesticandForeignRigh.pdf WA01-012DETROITDIESELWaiverofDomesticandForeign...

173

WA_1995_039_USABC_Waiver_of_Domestic_and_Foreign_Rights_Unde...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ofDomesticandForeignRightsUnde.pdf More Documents & Publications WA1993032FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA97038FORDMOTORCOMPANYWaiverofDomes...

174

WA_01-016_FORD_MOTOR_CO_Waive_of_Domestic_and_Foreign_Invent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-016FORDMOTORCOWaiveofDomesticandForeignInvent.pdf WA01-016FORDMOTORCOWaiveofDomesticandForeignInvent.pdf WA01-016FORDMOTORCOWaiveofDomesticandForeign...

175

Pages that link to "Category:Seattle, WA" | Open Energy Information  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Pages that link to "Category:Seattle, WA" Category:Seattle, WA Jump to: navigation, search What links here Page:...

176

WA_03_046_INTERMAGNETICS_GENERAL_CORP_Waiver_of_Domestic_and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IGC-SUPERPOWERLLCWaiverofDomesticandForeign.pdf WA03028SUPERPOWERINCWaiverofPatentRightsUnderaDOE.pdf WA99008DUPONTSUPERCONDUCTIVITYWaiverofUSandForeign...

177

WA_03_001_CHEVRON_TEXACO_Waiver_of_Domestic_and_Foreign_Pate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01CHEVRONTEXACOWaiverofDomesticandForeignPate.pdf WA03001CHEVRONTEXACOWaiverofDomesticandForeignPate.pdf WA03001CHEVRONTEXACOWaiverofDomesticandForeignP...

178

WA_1993_043_DETROIT_DEISEL_CORPORATION_Waiver_of_U.S._and_Fo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

43DETROITDEISELCORPORATIONWaiverofU.S.andFo.pdf WA1993043DETROITDEISELCORPORATIONWaiverofU.S.andFo.pdf WA1993043DETROITDEISELCORPORATIONWaiverofU.S.andF...

179

WA_1993_034_CONSOLIDATED_NATURAL_GAS_(CNG)_Waiver_of_Domesti...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1993034CONSOLIDATEDNATURALGAS(CNG)WaiverofDomesti.pdf WA1993034CONSOLIDATEDNATURALGAS(CNG)WaiverofDomesti.pdf WA1993034CONSOLIDATEDNATURALGAS(CNG)Waiverof...

180

WA_02_032_DOW_CHEMICAL_CO_Waiver_of_Domestic_and_Foreign_Pat...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32DOWCHEMICALCOWaiverofDomesticandForeignPat.pdf WA02032DOWCHEMICALCOWaiverofDomesticandForeignPat.pdf WA02032DOWCHEMICALCOWaiverofDomesticandForeign...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

WA_1993_007_DOW_CHEMICAL_COMPANY_Waiver_of_U.S._and_Foreign_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1993007DOWCHEMICALCOMPANYWaiverofU.S.andForeign.pdf WA1993007DOWCHEMICALCOMPANYWaiverofU.S.andForeign.pdf WA1993007DOWCHEMICALCOMPANYWaiverofU.S.andF...

182

WA_01_002_CREE_LIGHTING_Waiver_of_Domestic_and_Foreign_Inven...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2CREELIGHTINGWaiverofDomesticandForeignInven.pdf WA01002CREELIGHTINGWaiverofDomesticandForeignInven.pdf WA01002CREELIGHTINGWaiverofDomesticandForeignInv...

183

WA_02_005_LUMILEDS_LIGHTING_Waiver_of_Domestic_and_Foreign_I...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2005LUMILEDSLIGHTINGWaiverofDomesticandForeignI.pdf WA02005LUMILEDSLIGHTINGWaiverofDomesticandForeignI.pdf WA02005LUMILEDSLIGHTINGWaiverofDomesticandFor...

184

WA_02_009_CONSOL_ENERGY_Multi_Pollutant_Emissions_Control-CL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02009CONSOLENERGYMultiPollutantEmissionsControl-CL.pdf WA02009CONSOLENERGYMultiPollutantEmissionsControl-CL.pdf WA02009CONSOLENERGYMultiPollutantEmissionsCon...

185

WA_06_021_UTC_FUEL_CELLS_LLC_Waiver_of_Patent_Rights_Under_a...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1UTCFUELCELLSLLCWaiverofPatentRightsUndera.pdf WA06021UTCFUELCELLSLLCWaiverofPatentRightsUndera.pdf WA06021UTCFUELCELLSLLCWaiverofPatentRightsUnder...

186

WA_02_039_SHELL_SOLAR_SYSTEMS_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39SHELLSOLARSYSTEMSWaiverofPatentRightsUnder.pdf WA02039SHELLSOLARSYSTEMSWaiverofPatentRightsUnder.pdf WA02039SHELLSOLARSYSTEMSWaiverofPatentRightsUnd...

187

WA_04_032_CARGILL_Waiver_of_Patent_Rights_under_PLATFORM_CHE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CARGILLINCWaiverofPatentRightsUnderACoopA.pdf WA04033CARGILLWaiverofPatentRightstoCARGILLDOWNL.pdf WA03032RWESCHOTTSOLARINCWaiverofPatentRightsUnder...

188

WA_03_032_RWE_SCHOTT_SOLAR_INC_Waiver_of_Patent_Rights_Under...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32RWESCHOTTSOLARINCWaiverofPatentRightsUnder.pdf WA03032RWESCHOTTSOLARINCWaiverofPatentRightsUnder.pdf WA03032RWESCHOTTSOLARINCWaiverofPatentRightsUn...

189

WA_06_016_BP_SOLAR_INTERNATIONAL_Waiver_of_Patent_Rights_Und...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf WA06016BPSOLARINTERNATIONALWaiverofPatentRightsUnd.pdf WA06016BPSOLARINTERNATIONALWaiverofPatentRightsU...

190

WA_05_061_CATERPILLAR_INC_Waiver_of_Patent_Rihts_to_Inventio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61CATERPILLARINCWaiverofPatentRihtstoInventio.pdf WA05061CATERPILLARINCWaiverofPatentRihtstoInventio.pdf WA05061CATERPILLARINCWaiverofPatentRihtstoInven...

191

WA_04_007_OSHKOSH_TRUCK_CORP_Waiver_of_Patent_Rights_Under_N...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07OSHKOSHTRUCKCORPWaiverofPatentRightsUnderN.pdf WA04007OSHKOSHTRUCKCORPWaiverofPatentRightsUnderN.pdf WA04007OSHKOSHTRUCKCORPWaiverofPatentRightsUnde...

192

WA_02_055_PRAXAIR_Waiver_of_Domestic_and_Foreign_Patent_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02055PRAXAIRWaiverofDomesticandForeignPatentRi...

193

WA_04_067_CATRPILLAR_INC_Waiver_of_Patent_Rights_to_Inventio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

67CATRPILLARINCWaiverofPatentRightstoInventio.pdf WA04067CATRPILLARINCWaiverofPatentRightstoInventio.pdf WA04067CATRPILLARINCWaiverofPatentRightstoInven...

194

WA_03_022_DELPHI_AUTO_SYSTEMS_Waiver_of_Patent_Rights_to_Inv...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2DELPHIAUTOSYSTEMSWaiverofPatentRightstoInv.pdf WA03022DELPHIAUTOSYSTEMSWaiverofPatentRightstoInv.pdf WA03022DELPHIAUTOSYSTEMSWaiverofPatentRightstoI...

195

WA_02_043_EMCORE_CORP_Waiver_of_Patent_Rights_Under_A_Subcon...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3EMCORECORPWaiverofPatentRightsUnderASubcon.pdf WA02043EMCORECORPWaiverofPatentRightsUnderASubcon.pdf WA02043EMCORECORPWaiverofPatentRightsUnderASubc...

196

WA_02_051_AQUA_CHEM_INC_Waiver_of_Patent_Rights_Under_A_Subc...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1AQUACHEMINCWaiverofPatentRightsUnderASubc.pdf WA02051AQUACHEMINCWaiverofPatentRightsUnderASubc.pdf WA02051AQUACHEMINCWaiverofPatentRightsUnderASu...

197

WA_00_008_PLUG_POWER_Waiver_of_Patent_Rights_in_Performance_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0008PLUGPOWERWaiverofPatentRightsinPerformance.pdf WA00008PLUGPOWERWaiverofPatentRightsinPerformance.pdf WA00008PLUGPOWERWaiverofPatentRightsinPerfor...

198

WA_05_026_GE_NUCLEAR_ENERGY_Waiver_of_Patent_Rights_Under_a_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6GENUCLEARENERGYWaiverofPatentRightsUndera.pdf WA05026GENUCLEARENERGYWaiverofPatentRightsUndera.pdf WA05026GENUCLEARENERGYWaiverofPatentRightsUnder...

199

WA_05_041_MACK_TRUCKS_INC_Waiver_of_Patent_Rights_to_Inventi...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1MACKTRUCKSINCWaiverofPatentRightstoInventi.pdf WA05041MACKTRUCKSINCWaiverofPatentRightstoInventi.pdf WA05041MACKTRUCKSINCWaiverofPatentRightstoInven...

200

WA_03_027_SUPERPOWER_INC_Waiver_of_Patent_Rights_Under_a_DOE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7SUPERPOWERINCWaiverofPatentRightsUnderaDOE.pdf WA03027SUPERPOWERINCWaiverofPatentRightsUnderaDOE.pdf WA03027SUPERPOWERINCWaiverofPatentRightsUnderaD...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

WA_04_058_SOLUTIA_INC_Waiver_of_Patent_Rights_Under_a_DOE_Co...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8SOLUTIAINCWaiverofPatentRightsUnderaDOECo.pdf WA04058SOLUTIAINCWaiverofPatentRightsUnderaDOECo.pdf WA04058SOLUTIAINCWaiverofPatentRightsUnderaDOE...

202

WA_04_031_ROHM_AND_HAAS_Waiver_of_Patent_Rights_under_NEW_SU...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31ROHMANDHAASWaiverofPatentRightsunderNEWSU.pdf WA04031ROHMANDHAASWaiverofPatentRightsunderNEWSU.pdf WA04031ROHMANDHAASWaiverofPatentRightsunderNEW...

203

WA_05_009_LUCENT_TECHNOLOGIES_INC_Waiver_of_Patent_Rights_Un...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09LUCENTTECHNOLOGIESINCWaiverofPatentRightsUn.pdf WA05009LUCENTTECHNOLOGIESINCWaiverofPatentRightsUn.pdf WA05009LUCENTTECHNOLOGIESINCWaiverofPatentRights...

204

WA_04_061_ROHM_AND_HAAS_COMPANY_Waiver_of_Patent_Rights_Unde...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61ROHMANDHAASCOMPANYWaiverofPatentRightsUnde.pdf WA04061ROHMANDHAASCOMPANYWaiverofPatentRightsUnde.pdf WA04061ROHMANDHAASCOMPANYWaiverofPatentRightsU...

205

WA_06_009_UNIVERSITY_OF_MINNESOTA_Waiver_of_Patent_Rights--W...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9UNIVERSITYOFMINNESOTAWaiverofPatentRights--W.pdf WA06009UNIVERSITYOFMINNESOTAWaiverofPatentRights--W.pdf WA06009UNIVERSITYOFMINNESOTAWaiverofPatentRights-...

206

WA_02_047_SOUTHWIRE_CO_Waiver_of_Patent_Rights_Under_A_Coope...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2047SOUTHWIRECOWaiverofPatentRightsUnderACoope.pdf WA02047SOUTHWIRECOWaiverofPatentRightsUnderACoope.pdf WA02047SOUTHWIRECOWaiverofPatentRightsUnderA...

207

WA_04_064_VELOCYS_INC_Waiver_of_Patent_Rgiths_Under_a_DOE_Co...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

64VELOCYSINCWaiverofPatentRgithsUnderaDOECo.pdf WA04064VELOCYSINCWaiverofPatentRgithsUnderaDOECo.pdf WA04064VELOCYSINCWaiverofPatentRgithsUnderaDOE...

208

WA_00_031_HONEYWELL_Waiver_Domestic_and_Foreign_Patent_Right...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31HONEYWELLWaiverDomesticandForeignPatentRight.pdf WA00031HONEYWELLWaiverDomesticandForeignPatentRight.pdf WA00031HONEYWELLWaiverDomesticandForeignPatentRi...

209

WA_98_010_SOLAREX_Waiver_of_of_Patent_Rights_Under_an_NREL_S...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8010SOLAREXWaiverofofPatentRightsUnderanNRELS.pdf WA98010SOLAREXWaiverofofPatentRightsUnderanNRELS.pdf WA98010SOLAREXWaiverofofPatentRightsUnderan...

210

WA_07_020_GENERAL_ELECTRIC_CO_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0GENERALELECTRICCOWaiverofPatentRightsUnder.pdf WA07020GENERALELECTRICCOWaiverofPatentRightsUnder.pdf WA07020GENERALELECTRICCOWaiverofPatentRightsUnde...

211

WA_05_021_UNITED_TECHNOLOGIES_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1UNITEDTECHNOLOGIESWaiverofPatentRightsUnder.pdf WA05021UNITEDTECHNOLOGIESWaiverofPatentRightsUnder.pdf WA05021UNITEDTECHNOLOGIESWaiverofPatentRightsUnde...

212

WA_06_015_PPG_INDUSTRIES_Waiver_of_Patent_Rights_Under_a_DOE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5PPGINDUSTRIESWaiverofPatentRightsUnderaDOE.pdf WA06015PPGINDUSTRIESWaiverofPatentRightsUnderaDOE.pdf WA06015PPGINDUSTRIESWaiverofPatentRightsUnderaD...

213

WA_04_029_UOP_LLC_Waiver_of_Patent_Rights_under_DISCOVERY_OF...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9UOPLLCWaiverofPatentRightsunderDISCOVERYOF.pdf WA04029UOPLLCWaiverofPatentRightsunderDISCOVERYOF.pdf WA04029UOPLLCWaiverofPatentRightsunderDISCOVERY...

214

WA_04_033_CARGILL_Waiver_of_Patent_Rights_to_CARGILL_DOWN_L.pdf...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3CARGILLWaiverofPatentRightstoCARGILLDOWNL.pdf WA04033CARGILLWaiverofPatentRightstoCARGILLDOWNL.pdf WA04033CARGILLWaiverofPatentRightstoCARGILLDOWNL....

215

WA_03_004_CARGILL_INC_Waiver_of_Patent_Rights_Under_A_Coop_A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04CARGILLINCWaiverofPatentRightsUnderACoopA.pdf WA03004CARGILLINCWaiverofPatentRightsUnderACoopA.pdf WA03004CARGILLINCWaiverofPatentRightsUnderACoo...

216

WA_04_047_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47CATERPILLARINCWaiverofPatentRightstoInventi.pdf WA04047CATERPILLARINCWaiverofPatentRightstoInventi.pdf WA04047CATERPILLARINCWaiverofPatentRightstoInve...

217

WA_04_044_GENERAL_MOTORS_CORP_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44GENERALMOTORSCORPWaiverofPatentRightsUnder.pdf WA04044GENERALMOTORSCORPWaiverofPatentRightsUnder.pdf WA04044GENERALMOTORSCORPWaiverofPatentRightsUnd...

218

WA_05_027_WESTINGHOUSE_Waiver_of_Patent_Rights_Under_a_Subco...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7WESTINGHOUSEWaiverofPatentRightsUnderaSubco.pdf WA05027WESTINGHOUSEWaiverofPatentRightsUnderaSubco.pdf WA05027WESTINGHOUSEWaiverofPatentRightsUnderaSub...

219

WA_04_037_VELOCCYS_INC_Waiver_of_Patent_Rights_Under_a_DOE_C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37VELOCCYSINCWaiverofPatentRightsUnderaDOEC.pdf WA04037VELOCCYSINCWaiverofPatentRightsUnderaDOEC.pdf WA04037VELOCCYSINCWaiverofPatentRightsUnderaDO...

220

WA_99_012_AIR_PRODUCTS_Waiver_of_Patent_Rights_Under_AN_NVO_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9012AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderA...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

WA_03_002_3M_COMPANY_Waiver_of_Patent_Rights_Under_A_DOE_Coo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30023MCOMPANYWaiverofPatentRightsUnderADOECoo.pdf WA030023MCOMPANYWaiverofPatentRightsUnderADOECoo.pdf WA030023MCOMPANYWaiverofPatentRightsUnderAD...

222

WA_04_038_3M_COMPANY__Waiver_of_Patent_Rights_Under_a_DOE_Co...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

83MCOMPANYWaiverofPatentRightsUnderaDOECo.pdf WA040383MCOMPANYWaiverofPatentRightsUnderaDOECo.pdf WA040383MCOMPANYWaiverofPatentRightsUnderaDOE...

223

WA_07_001_EASTMAN_KODAK_COMPANY_Waiver_of_Patent_Rights_Unde...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01EASTMANKODAKCOMPANYWaiverofPatentRightsUnde.pdf WA07001EASTMANKODAKCOMPANYWaiverofPatentRightsUnde.pdf WA07001EASTMANKODAKCOMPANYWaiverofPatentRightsU...

224

WA_04_071_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1CATERPILLARINCWaiverofPatentRightstoInventi.pdf WA04071CATERPILLARINCWaiverofPatentRightstoInventi.pdf WA04071CATERPILLARINCWaiverofPatentRightstoInven...

225

WA_03_031_UNITED_TECHNOLOGIES_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3031UNITEDTECHNOLOGIESWaiverofPatentRightsUnder.pdf WA03031UNITEDTECHNOLOGIESWaiverofPatentRightsUnder.pdf WA03031UNITEDTECHNOLOGIESWaiverofPatentRights...

226

WA_04_081_GENERAL_ELECTRIC_COMPANY_Waiver_of_Patent_Rights_U...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1GENERALELECTRICCOMPANYWaiverofPatentRightsU.pdf WA04081GENERALELECTRICCOMPANYWaiverofPatentRightsU.pdf WA04081GENERALELECTRICCOMPANYWaiverofPatentRights...

227

WA_06_026_CREE_INC_Waiver_of_Patent_Rights_Under_a_Subcontra...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6CREEINCWaiverofPatentRightsUnderaSubcontra.pdf WA06026CREEINCWaiverofPatentRightsUnderaSubcontra.pdf WA06026CREEINCWaiverofPatentRightsUnderaSubcont...

228

WA_03_028_SUPERPOWER_INC_Waiver_of_Patent_Rights_Under_a_DOE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8SUPERPOWERINCWaiverofPatentRightsUnderaDOE.pdf WA03028SUPERPOWERINCWaiverofPatentRightsUnderaDOE.pdf WA03028SUPERPOWERINCWaiverofPatentRightsUnderaD...

229

WA_01_030_GENERAL_ELECTRIC_CO_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0GENERALELECTRICCOWaiverofPatentRightsUnder.pdf WA01030GENERALELECTRICCOWaiverofPatentRightsUnder.pdf WA01030GENERALELECTRICCOWaiverofPatentRightsUnde...

230

WA_02_048_EATON_CORPORATION_Waviver_of_Patent_Rights_Under_A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2048EATONCORPORATIONWaviverofPatentRightsUnderA.pdf WA02048EATONCORPORATIONWaviverofPatentRightsUnderA.pdf WA02048EATONCORPORATIONWaviverofPatentRightsU...

231

WA_00_009_ARTHUR_D_LITTLE_Waiver_of_Patent_Rights_in_Perform...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9ARTHURDLITTLEWaiverofPatentRightsinPerform.pdf WA00009ARTHURDLITTLEWaiverofPatentRightsinPerform.pdf WA00009ARTHURDLITTLEWaiverofPatentRightsinPerfo...

232

WA_05_052_CATERPILLAR_INC_Waiver_of_Patent_Rights_to_Inventi...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52CATERPILLARINCWaiverofPatentRightstoInventi.pdf WA05052CATERPILLARINCWaiverofPatentRightstoInventi.pdf WA05052CATERPILLARINCWaiverofPatentRightstoInve...

233

WA_02_029_CUMMINS_ENGINE_CO_Waiver_of_Patent_Rights_Under_DO...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29CUMMINSENGINECOWaiverofPatentRightsUnderDO.pdf WA02029CUMMINSENGINECOWaiverofPatentRightsUnderDO.pdf WA02029CUMMINSENGINECOWaiverofPatentRightsUnder...

234

WA_04_011_KENNAMETAL_INC_Waiver_of_Patent_Rights_Under_Subco...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11KENNAMETALINCWaiverofPatentRightsUnderSubco.pdf WA04011KENNAMETALINCWaiverofPatentRightsUnderSubco.pdf WA04011KENNAMETALINCWaiverofPatentRightsUnderSu...

235

WA_06_027_EASTMAN_KODAK_COMPANY_Waiver_of_Patent_Rights_Unde...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7EASTMANKODAKCOMPANYWaiverofPatentRightsUnde.pdf WA06027EASTMANKODAKCOMPANYWaiverofPatentRightsUnde.pdf WA06027EASTMANKODAKCOMPANYWaiverofPatentRightsUn...

236

WA_2006_007_SOLVEY_OLEXIS_SpA_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006007SOLVEYOLEXISSpAWaiverofPatentRightsUnder.pdf WA2006007SOLVEYOLEXISSpAWaiverofPatentRightsUnder.pdf WA2006007SOLVEYOLEXISSpAWaiverofPatentRights...

237

WA_06_014_PPG_INDUSTRIES_INC_Waiver_of_Patent_Rights_Under_a...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4PPGINDUSTRIESINCWaiverofPatentRightsUndera.pdf WA06014PPGINDUSTRIESINCWaiverofPatentRightsUndera.pdf WA06014PPGINDUSTRIESINCWaiverofPatentRightsUnder...

238

WA_05_030_BOC_GROUP_Waiver_of_Patent_Rights_Under_a_DOE_Co-O...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0BOCGROUPWaiverofPatentRightsUnderaDOECo-O.pdf WA05030BOCGROUPWaiverofPatentRightsUnderaDOECo-O.pdf WA05030BOCGROUPWaiverofPatentRightsUnderaDOECo...

239

WA_04_008_GENERAL_MOTORS_CORP_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08GENERALMOTORSCORPWaiverofPatentRightsUnder.pdf WA04008GENERALMOTORSCORPWaiverofPatentRightsUnder.pdf WA04008GENERALMOTORSCORPWaiverofPatentRightsUnd...

240

WA_04_016_MACK_TRUCKS_Waiver_of_Patent_Rights_under_NREL_Sub...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16MACKTRUCKSWaiverofPatentRightsunderNRELSub.pdf WA04016MACKTRUCKSWaiverofPatentRightsunderNRELSub.pdf WA04016MACKTRUCKSWaiverofPatentRightsunderNREL...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

WA_03_035_CATERPILLAR_INC_Waiver_of_Patent_Rights_Under_a_DO...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3035CATERPILLARINCWaiverofPatentRightsUnderaDO.pdf WA03035CATERPILLARINCWaiverofPatentRightsUnderaDO.pdf WA03035CATERPILLARINCWaiverofPatentRightsUnde...

242

WA_04_079_PRAXAIR_INC_Waiver_of_Patent_Rights_Under_a_Subcon...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf WA04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf WA04079PRAXAIRINCWaiverofPatentRightsUnderaSub...

243

WA_00_020_PRAXAIR_Waiver_of_Domestic_and_Foreign_Patent_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA00020PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA00020PRAXAIRWaiverofDomesticandForeignPatentR...

244

WA_04_062_ROHM_AND_HAAS_COMPANY_Waiver_of_Patent_Rights_Unde...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2ROHMANDHAASCOMPANYWaiverofPatentRightsUnde.pdf WA04062ROHMANDHAASCOMPANYWaiverofPatentRightsUnde.pdf WA04062ROHMANDHAASCOMPANYWaiverofPatentRightsUn...

245

WA_04_039_HONEYWELL_INTERNATIONAL_Waiver_of_Patent_Rights_Un...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA04039HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA04039HONEYWELLINTERNATIONALWaiverofPatentRights...

246

WA_06_018_GENERAL_ELECTRIC_COMPANY_Waiver_of_Patent_Rights_U...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8GENERALELECTRICCOMPANYWaiverofPatentRightsU.pdf WA06018GENERALELECTRICCOMPANYWaiverofPatentRightsU.pdf WA06018GENERALELECTRICCOMPANYWaiverofPatentRights...

247

WA_01_039_PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_Patent_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9PRAXAIRINCWaiverofDomesticandForeignPatent.pdf WA01039PRAXAIRINCWaiverofDomesticandForeignPatent.pdf WA01039PRAXAIRINCWaiverofDomesticandForeignPaten...

248

WA_03_026_EI_DUPONT_DENEMOURS_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26EIDUPONTDENEMOURSWaiverofPatentRightsUnder.pdf WA03026EIDUPONTDENEMOURSWaiverofPatentRightsUnder.pdf WA03026EIDUPONTDENEMOURSWaiverofPatentRightsUnd...

249

WA_04_027_GENERAL_ELECTRIC_Waiver_of_Patent_Rights_for_DISTR...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7GENERALELECTRICWaiverofPatentRightsforDISTR.pdf WA04027GENERALELECTRICWaiverofPatentRightsforDISTR.pdf WA04027GENERALELECTRICWaiverofPatentRightsforDIS...

250

WA_02_033_GENERAL_ELECTRIC_Waiver_of_Patent_Rights_Under_DOE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33GENERALELECTRICWaiverofPatentRightsUnderDOE.pdf WA02033GENERALELECTRICWaiverofPatentRightsUnderDOE.pdf WA02033GENERALELECTRICWaiverofPatentRightsUnder...

251

WA_06_020_ARIZONA_PUBLIC_SERVICE_Waivier_of_Patent_Rights_Un...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0ARIZONAPUBLICSERVICEWaivierofPatentRightsUn.pdf WA06020ARIZONAPUBLICSERVICEWaivierofPatentRightsUn.pdf WA06020ARIZONAPUBLICSERVICEWaivierofPatentRights...

252

WA_06_029_GENSCAPE_INC_Waiver_of_Patent_Rights_Under_a_Subco...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9GENSCAPEINCWaiverofPatentRightsUnderaSubco.pdf WA06029GENSCAPEINCWaiverofPatentRightsUnderaSubco.pdf WA06029GENSCAPEINCWaiverofPatentRightsUnderaSub...

253

WA_98_007_SOLAREX_Waiver_of_Domestic_and_Foreign_Patent_Righ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7SOLAREXWaiverofDomesticandForeignPatentRigh.pdf WA98007SOLAREXWaiverofDomesticandForeignPatentRigh.pdf WA98007SOLAREXWaiverofDomesticandForeignPatentRi...

254

WA_03_011_ROCKWELL_AUTOMATION_Waiver_of_Patent_Rights_Under_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA03011ROCKWELLAUTOMATIONWaiverofPatentRights...

255

WA_04_059_EATON_CORPORATION_Waiver_of_Patent_Rights_Under_a_...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9EATONCORPORATIONWaiverofPatentRightsUndera.pdf WA04059EATONCORPORATIONWaiverofPatentRightsUndera.pdf WA04059EATONCORPORATIONWaiverofPatentRightsUnder...

256

WA_06_013_McDERMOTT_TECHNOLOGY_INC_Waiver_of_Patent_Rights_t...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3McDERMOTTTECHNOLOGYINCWaiverofPatentRightst.pdf WA06013McDERMOTTTECHNOLOGYINCWaiverofPatentRightst.pdf WA06013McDERMOTTTECHNOLOGYINCWaiverofPatentRights...

257

WA_02_030_OXFORD_INSTRUMENTS_Waiver_of_Patent_Rights_under_D...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30OXFORDINSTRUMENTSWaiverofPatentRightsunderD.pdf WA02030OXFORDINSTRUMENTSWaiverofPatentRightsunderD.pdf WA02030OXFORDINSTRUMENTSWaiverofPatentRightsunde...

258

WA_1993_020_GENERAL_MOTORS_Waiver_of_Domestic_and_Foreign_Ri...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORSWaiverofDomesticandForeignRi.pdf More Documents & Publications WA04020GENERALELECTRICWaiverofDomesticandForeignIn.pdf WA03019GENERALMOTORSCORPWaiverofDom...

259

WA_00_003_DUKE_SOLAR_ENERGY_Waiver_of_Domestic_and_Foreign_P...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0003DUKESOLARENERGYWaiverofDomesticandForeignP.pdf WA00003DUKESOLARENERGYWaiverofDomesticandForeignP.pdf WA00003DUKESOLARENERGYWaiverofDomesticandFor...

260

WA_1993_038_TEXAS_INSTRUMENTS_INC_Waiver_of_U.S._and_Foreign...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8TEXASINSTRUMENTSINCWaiverofU.S.andForeign.pdf WA1993038TEXASINSTRUMENTSINCWaiverofU.S.andForeign.pdf WA1993038TEXASINSTRUMENTSINCWaiverofU.S.andForeign...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects for 1990/1991.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation.

United States. Bonneville Power Administration.

1990-12-01T23:59:59.000Z

262

Charting a Course for the Future : BPA Programs in Perspectives, Technical Appendix.  

SciTech Connect

Programs in Perspective is the Bonneville Power Administration`s public involvement process for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA. This process leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad issues than is possible under the strict administrative procedures of ratemaking. The self-financed character of BPA has made this public process a necessary and valuable one to assure that those who play BPA`s rates have a clear understanding and a strong voice in the plans for use of the resulting revenues.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

263

BPA Regional High School Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Oregon Regions » BPA Regional High School Oregon Regions » BPA Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Oregon Regions BPA Regional High School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Christy Adams Email: cfadams@bpa.gov Regional Event Information Date: Saturday, February 1, 2014 Maximum Number of Teams: 64 Maximum Number of Teams per School: 3

264

BPA Regional Middle School Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Oregon Regions » BPA Regional Middle School Oregon Regions » BPA Regional Middle School Science Bowl National Science Bowl® (NSB) NSB Home About High School Middle School Middle School Students Middle School Coaches Middle School Regionals Middle School Rules, Forms, and Resources Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Oregon Regions BPA Regional Middle School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Christy Adams Email: cfadams@bpa.gov Regional Event Information Date: Saturday, January 25, 2014 Maximum Number of Teams: 64

265

Record of Decision for BPA Short-Term Marketing and Operating Arrangements (1/31/96)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Federal Register / Vol. 61, No. 21 / Wednesday, January 31, 1996 / Notices Bonneville Power Administration Notice of Availability of Record of Decision for Short-Term Marketing and Operating Arrangements AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: BPA has decided to enter into short-term marketing and operational arrangements in order to participate continuously in the open electric power market. These arrangements would enable BPA to achieve the best reliability and expected economic outcome, as well as to best meet its environmental responsibilities, given diverse market conditions. This decision would support power cost control, enhance BPA competitiveness, and provide public benefits. The

266

BPA Regional Middle School Science Bowl | U.S. DOE Office of...  

Office of Science (SC) Website

teams taking precedence over third teams, with the goal of having as many different schools participating as possible. Please go to www.bpa.govgotoScienceBowl to register for...

267

BPA Regional High School Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

teams taking precedence over third teams, with the goal of having as many different schools participating as possible. Please go to www.bpa.govgotoScienceBowl External link to...

268

W(A)94-022 STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

W(A)94-022 STATEMENT OF CONSIDERATIONS Request by Cummins Power Generation, Inc., for an Advance Waiver of Domestic and Foreign Patent Rights to Inventions made under a contract...

269

BayWa Sunways JV | Open Energy Information  

Open Energy Info (EERE)

JV that specialises in developing, planning and realizing medium-sized to large photovoltaic systems and solar plants. References BayWa & Sunways JV1 LinkedIn Connections...

270

Isotopic Studies of Contaminant Transport at the Hanford Site, WA  

E-Print Network (OSTI)

MR-0132. Westinghouse Hanford Company, Richland WA. Bretz,in recharge at the Hanford Site. Northwest Science. 66:237-M.J. , ed. 2000. Hanford Site groundwater Monitoring

Christensen, J.N.; Conrad, M.E.; DePaolo, D.J.; Dresel, P.E.

2008-01-01T23:59:59.000Z

271

Secretary Bodman Meets with Senators, Commits to Further Discussion of BPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Senators, Commits to Further Discussion Senators, Commits to Further Discussion of BPA Debt Prepayment Proposal Secretary Bodman Meets with Senators, Commits to Further Discussion of BPA Debt Prepayment Proposal February 16, 2006 - 11:57am Addthis WASHINGTON, DC - Secretary of Energy Samuel W. Bodman, in a meeting today with Pacific Northwest Senators hosted by Senator Larry Craig, committed to continue discussions with Pacific Northwest interests concerning the Bonneville Power Administration (BPA) debt prepayment proposal included in President Bush's FY 2007 Budget Request. "It was helpful for me to hear the perspectives of this bipartisan group of Pacific Northwest Senators, and to hear their views about the proposal in the President's budget request," Secretary Bodman said. "However, I

272

Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects, 1989/1990.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) held a public meeting on November 6-7, 1990, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. The following pages list the projects by title, the project leaders and BPA's project officers, and an abstract of each leaders presentation. These summaries are in some cases preliminary; they are subject to change and should not be quoted without consulting the project leader.

United States. Bonneville Power Administration.

1990-12-01T23:59:59.000Z

273

WA S C2 0 01 Handbook of  

E-Print Network (OSTI)

WA S C2 0 01 Handbook of Accreditation #12;The Western Association of Schools and Colleges be terminated, or when the Commission formally acts to terminate accreditation. This Handbook of Accreditation associations and related bodies, see pages 118­119. #12;HANDBOOK OF ACCREDITATION Standards Addressing Core

California at Santa Cruz, University of

274

DOE - Office of Legacy Management -- University of Washington - WA 0-01  

Office of Legacy Management (LM)

Washington - WA 0-01 Washington - WA 0-01 FUSRAP Considered Sites Site: UNIVERSITY OF WASHINGTON (WA.0-01) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Seattle , Washington WA.0-01-1 Evaluation Year: 1987 WA.0-01-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment. WA.0-01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination considered remote - Operating under active NRC license WA.0-01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None Indicated WA.0-01-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see

275

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project...

276

WA_06_017_Waiver_of_The_Govt_US_and_Foreign_Patent_Rights_fo...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7WaiverofTheGovtUSandForeignPatentRightsfo.pdf WA06017WaiverofTheGovtUSandForeignPatentRightsfo.pdf WA06017WaiverofTheGovtUSandForeignPatentRights...

277

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task 2 Report  

SciTech Connect

Task report detailing low probability tail event analysis and mitigation in BPA control area. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, causing the imbalance between generation and load to become very significant.

Lu, Shuai; Makarov, Yuri V.; McKinstry, Craig A.; Brothers, Alan J.; Jin, Shuangshuang

2009-09-18T23:59:59.000Z

278

File:INL-geothermal-wa.pdf | Open Energy Information  

Open Energy Info (EERE)

wa.pdf wa.pdf Jump to: navigation, search File File history File usage Washington Geothermal Resources Size of this preview: 699 × 600 pixels. Full resolution ‎(4,835 × 4,147 pixels, file size: 3.28 MB, MIME type: application/pdf) Description Washington Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Washington File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:45, 16 December 2010 Thumbnail for version as of 12:45, 16 December 2010 4,835 × 4,147 (3.28 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

279

GRR/Section 15-WA-a - Air Quality Notice of Construction Permit | Open  

Open Energy Info (EERE)

5-WA-a - Air Quality Notice of Construction Permit 5-WA-a - Air Quality Notice of Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-a - Air Quality Notice of Construction Permit 15-WA-a - Air Quality Notice of Construction Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-400-110 WAC 173-400-111 WAC 173-400-171 Triggers None specified This flowchart illustrates the process for obtaining an Air Quality Notice of Construction Permit. The Washington State Department of Ecology (WSDE) oversees the permitting process under WAC 173-400. 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf

280

Plant and operational features of the BPA 30 MJ superconducting magnetic energy storage system  

DOE Green Energy (OSTI)

A 30 MJ superconducting magnetic energy storage (SMES) system was designed and developed for application in the Western US Power System to damp power oscillations that limit high voltage ac transmission. The system is in place at the Bonneville Power Administration (BPA) Tacoma Substation and has been in an experimental use for over a year. Extended operations of the unit have been undertaken with success. The physical, electrical, and operational features of the SMES system are given.

Rogers, J.D.; Hauer, J.F.

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

282

GRR/Section 9-WA-b - State Environmental Review | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-WA-b - State Environmental Review GRR/Section 9-WA-b - State Environmental Review < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-b - State Environmental Review 9-WA-b - State Environmental Review.pdf Click to View Fullscreen Triggers None specified Once the lead agency is determined they are responsible for continuing forward with environmental review. In Washington, environmental review is effectuated through the developer completing an Environmental Checklist which assists the lead agency in determining whether the proposal will likely result in negative impacts on the environment. 9-WA-b - State Environmental Review.pdf 9-WA-b - State Environmental Review.pdf Error creating thumbnail: Page number not in range.

283

Proposed Revenues, Financial Strategy, and Program Costs for FY 1992 and 1993 : Technical Appendix, BPA Programs in Perspective.  

Science Conference Proceedings (OSTI)

Programs in Perspective is the Bonneville Power Administration's public involvement process (PIP) for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA effort. This planning leads into a biennial rate setting cycle and offers a more accessible and flexible opportunity for dialog on broad issues than is possible under the strict administrative procedures of ratemaking. The self-financed character of BPA has made this public process a necessary and valuable one to assure that those who pay BPA's rates have a clear understanding and a strong voice in the plans for use of the resulting revenues. During 1989, the previous PIP engaged the region in discussion of major strategic, issues focussing on major areas. In 1990, BPA seeks discussion of the directions and plans specifically for fiscal years 1992 and 1993. The steps taken for those years will lay the foundation for the years beyond. Thus, we have subtitled this year's process, Staying fit for the long run.'' We have consulted extensively with customers and others in the region in developing these plans. In dozens of program--specific meetings, BPA staff have talked and listened to what others think our plans ought to be. PIP now gives us a chance to review their sum total, along with projections for revenues and our overall financial position. 8 tabs., 8 figs.

United States. Bonneville Power Administration.

1990-07-01T23:59:59.000Z

284

GRR/Section 12-WA-a - Live Wildlife Taking Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 12-WA-a - Live Wildlife Taking Permit GRR/Section 12-WA-a - Live Wildlife Taking Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-WA-a - Live Wildlife Taking Permit 12-WA-a - Live Wildlife Taking Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Fish and Wildlife Regulations & Policies WAC 232-12-064 Triggers None specified In Washington, it is unlawful to take wildlife from the wild without permission from the Washington State Department of Fish and Wildlife (WDFW). The WDFW issues Live Wildlife Taking Permits under WAC 232-12-064. 12-WA-a - Live Wildlife Taking Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

285

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) June 12, 2013 DOE referred the matter of Fisher & Paykel Appliances residential clothes washer, model WA42T26GW1, to the U.S. Environmental Protection Agency, brand manager for the ENERGY STAR Program, for appropriate action after DOE testing showed that the model does not meet the ENERGY STAR specification. Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) More Documents & Publications Regulatory Burden RFI DOE response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices

286

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

287

GRR/Section 3-WA-b - Land Access Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-b - Land Access Overview GRR/Section 3-WA-b - Land Access Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-b - Land Access Overview 3-WA-b - Land Access Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Triggers None specified Any developer that needs access to or through state lands must obtain the appropriate permit or lease. The developer will obtain such permit or lease through the Washington State Department of Natural Resources. 3-WA-b - Land Access Overview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

288

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: W.A. Parish Post-Combustion CO2 Capture and Sequestration 73: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

289

W(A)94-022 STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-022 4-022 STATEMENT OF CONSIDERATIONS Request by Cummins Power Generation, Inc., for an Advance Waiver of Domestic and Foreign Patent Rights to Inventions made under a contract entitled "Utility Scale Joint Venture Project," between Cummins Power Generation, Inc. and Sandia National Laboratories (Contract No. AB- 8717B) under Management and Operations Contract DE-AL04-84AL85000, DOE Docket No. W(A)94-022. The petitioner, Cummins Power Generation, Inc., (CPG) has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or first actually reduce to practice in the course of work under the Utility Scale Joint Venture Project between Petitioner and Sandia National Laboratories (Sandia) under contract No. AB- 8717B. Sandia is operated by Sandia Corporation for the U.S. Department of Energy (DOE).

290

W(A)93-013 STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 13 STATEMENT OF CONSIDERATIONS Request by AlliedSignal, Inc. for Waiver of Domestic and Foreign Patent Rights to inventions that may arise under Contract No. DE-FC04-93AL94462 between the United States Department of Energy (DOE) and AlliedSignal, Inc. DOE Docket: W(A)93-013 The Petitioner, AlliedSignal, Inc. (AlliedSignal), has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or reduce to practice in the course of work under Contract No. DE-FC04-93AL94462, a Cooperative Agreement with DOE. The project period is May 14, 1993 through May 13, 1996. The Cooperative Agreement covers work in designing a biological/chemical production process for caprolactam using microbial bioprocesses that convert cyclohexane to

291

W(A)93-039 STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 STATEMENT OF CONSIDERATIONS Request by Air Products and Chemicals, Inc. for Waiver of Domestic and Foreign Patent Rights to inventions that may arise under Contract No. DE-FC04-93AL94461 between the United States Department of Energy (DOE) and Air Products and Chemicals, Inc. DOE Docket: W(A)93-039. The Petitioner, Air Products and Chemicals, Inc., (Air Products) has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or reduce to practice in the course of work under Contract No. DE-FC04-93AL94461 a Cooperative Agreement with DOE. The contract covers a four phase development program for a recently patented technology developed at Air Products entitled "Novel Selective Surface Flow (SSF T ) Membranes for the

292

Microbial community changes during sustained Cr(VI) reduction at the 100H site in Hanford, WA  

E-Print Network (OSTI)

at the 100H site in Hanford, WA Romy Chakraborty 1 , Eoin Lcontaminated aquifer at the Hanford (WA) 100H site in 2004.Cr(VI) reduction at Hanford, and a comparison of the

Chakraborty, Romy

2010-01-01T23:59:59.000Z

293

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

294

2007-2008 Annual Progress Report for BPA Grant Exp Restore Walla Walla River Flow  

DOE Green Energy (OSTI)

WWBWC and its partners have been working on a wide variety of conservation and aquifer recharge related activities including: monitoring groundwater and surface water conditions, creating a geospatial database for the Walla Walla River valley (project focal area), expanding aquifer recharge testing at the HBDIC site and conducting an extensive outreach/education program by which to share the information, ideas and potential solutions to our current water management issues in this basin. This report is an outline of those activities and is accompanied by individual program-component (attached as appendices) reports for the areas that BPA is assisting to fund these on-the-ground projects along with the innovative research and monitoring being done to further aquifer recharge as a water management tool for the Pacific Northwest.

Bower, Bob [WWBWC (Walla Walla Basin Watershed Council)

2009-07-10T23:59:59.000Z

295

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

296

EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Hanford Site Natural Gas Pipeline, Richland, WA 7: Hanford Site Natural Gas Pipeline, Richland, WA EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA Summary This EIS will evaluate the environmental impacts of a proposal to enter into a contract with a licensed natural gas supplier in Washington State to construct, operate, and maintain a natural gas pipeline. The pipeline would deliver natural gas to support the Waste Treatment Plant and the 242-A Evaporator operations in the 200 East Area of the Hanford Site. Public Comment Opportunities None available at this time. For more information, contact: Mr. Douglas Chapin, NEPA Document Manager U.S. Department of Energy Richland Operations Office P.O. Box 550, MSIN A5-11 Richland, WA 99352 Documents Available for Download January 23, 2012 EIS-0467: Notice of Intent to Prepare an Environmental Impact Statement and

297

GRR/Section 9-WA-c - State Environmental Impact Statement | Open Energy  

Open Energy Info (EERE)

GRR/Section 9-WA-c - State Environmental Impact Statement GRR/Section 9-WA-c - State Environmental Impact Statement < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-c - State Environmental Impact Statement 9-WA-c - State Environmental Impact Statement.pdf Click to View Fullscreen Triggers None specified The primary purpose of an Environmental Impact Statement (EIS) is to ensure that the Washington State Environmental Policy Act (SEPA) policies are an integral part of the ongoing programs and actions of state and local government. An EIS must provide impartial discussion of significant environmental impacts and must inform decision makers and the public of reasonable alternatives, including mitigation measures that would avoid or minimize adverse impacts or enhance environmental quality. WAC 197-11-400.

298

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells |  

Open Energy Info (EERE)

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-f - Water Well NOI for Replacement or Additional Wells 19-WA-f - Water Well NOI for Replacement or Additional Wells.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.44.100 Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well in a different location than a previous well, drill an additional well at an existing location, or drill a replacement well at the same

299

GRR/Section 11-WA-a - State Cultural Considerations Overview | Open Energy  

Open Energy Info (EERE)

GRR/Section 11-WA-a - State Cultural Considerations Overview GRR/Section 11-WA-a - State Cultural Considerations Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-a - State Cultural Considerations Overview 11-WA-a - State Cultural Considerations Overview.pdf Click to View Fullscreen Triggers None specified The developer will be required to comply with Washington state law when human remains or other cultural resources are discovered on a project site. Cultural resources include both historic and archaeological resources and sites. The discovery of cultural resources may require obtaining a permit and providing public notice and notice to Indian Tribes. Once the necessary procedures have been followed, the developer may continue with the project.

300

GRR/Section 18-WA-a - Underground Storage Tank Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-WA-a - Underground Storage Tank Process GRR/Section 18-WA-a - Underground Storage Tank Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-a - Underground Storage Tank Process 18-WA-a - Underground Storage Tank Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.76 Washington Administrative Code Chapter 173-360 Triggers None specified Washington has a federally-approved state Underground Storage Tank (UST) program regulated by the Washington State Department of Ecology (WSDE) under Revised Code of Washington Chapter 90.76 and Washington Administrative Code Chapter 173-360. Washington defines an "Underground

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

GRR/Section 5-WA-a - Drilling and Well Development | Open Energy  

Open Energy Info (EERE)

GRR/Section 5-WA-a - Drilling and Well Development GRR/Section 5-WA-a - Drilling and Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-WA-a - Drilling and Well Development 5-WA-a.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Geothermal Act 78.60 RCW Geothermal Rules 332-17 WAC Triggers None specified In Washington geothermal drilling and well development are regulated by the Washington State Department of Natural Resources (WSDNR). Geothermal production wells and core holes deeper than 750ft require the developer go through the whole WSDNR permitting process (which requires a public hearing) and require that the developer complete the State Environmental

302

GRR/Section 3-WA-e - State Right of Way Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-e - State Right of Way Process GRR/Section 3-WA-e - State Right of Way Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-e - State Right of Way Process 3-WA-e - State Right of Way Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-36-350 RCW 79-36-520 RCW 79-36-530 Triggers None specified This flowchart illustrates the process for obtaining a right of way over state lands in Washington. The right of way process is overseen by the Washington State Department of Natural Resources (WSDNR). The right of way process is regulated under Revised Code of Washington (RCW) 79-36-350. The developer may apply for an easement, permit or license for a right of

303

GRR/Section 14-WA-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-d - Section 401 Water Quality Certification GRR/Section 14-WA-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-d - Section 401 Water Quality Certification 14-WA-d - 401 Water Quality Certification.pdf Click to View Fullscreen Contact Agencies U S Army Corps of Engineers Washington State Department of Ecology Regulations & Policies Revised Statute of Washington Chapter 90.48 Washington Administrative Code Chapter 173-201A Washington Administrative Code 173-225-030 Triggers None specified Developers requiring a Section 404 Dredge and Fill Permit from the U S Army Corps of Engineers (Corps) are required to obtain a Section 401 Water Quality Certification from the state of Washington. The Washington State

304

GRR/Section 19-WA-d - Water Conservancy Board Transfer or Change of Water  

Open Energy Info (EERE)

19-WA-d - Water Conservancy Board Transfer or Change of Water 19-WA-d - Water Conservancy Board Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-d - Water Conservancy Board Transfer or Change of Water Right 19-WA-d - Water Conservancy Board Transfer or Change of Water Right.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.80 RCW 90.03.380 90.03.390 RCW 90.44.100 Triggers None specified In 1997, the Washington Legislature authorized the creation of water conservancy boards through the enactment of Revised Code of Washington Chapter 90.80 to expedite the administrative process for voluntary water right transfers within individual counties. In counties where a water

305

GRR/Section 19-WA-e - Water Well Notice of Intent for New Well | Open  

Open Energy Info (EERE)

GRR/Section 19-WA-e - Water Well Notice of Intent for New Well GRR/Section 19-WA-e - Water Well Notice of Intent for New Well < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-e - Water Well Notice of Intent for New Well 19-WA-e - Water Well Notice of Intent for New Well.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well to access the ground water. When a developer needs to drill a new well, the developer must complete the Notice of Intent (NOI) to Drill a Well form and submit the form to the Washington State Department of Ecology

306

GRR/Section 14-WA-b - State NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-b - State NPDES Permitting Process GRR/Section 14-WA-b - State NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-b - State NPDES Permitting Process 14-WA-b - State NPDES Permitting Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology United States Environmental Protection Agency Regulations & Policies Clean Water Act Chapter 90.48 RCW Chapter 173-216 WAC Triggers None specified Section 402 of the Clean Water Act (CWA) required the Environmental Protection Agency (EPA) to establish the National Pollutant Discharge Elimination System (NPDES) to regulate discharge of pollutants from point sources. In Washington, the EPA has delegated responsibility of NPDES to

307

GRR/Section 4-WA-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 4-WA-a - State Exploration Process GRR/Section 4-WA-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-WA-a - State Exploration Process 4-WA-a State Exploration Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Geothermal Act 78.60 RCW Geothermal Rules 332-17 WAC Triggers None specified Geothermal exploration in Washington requires a Geothermal Exploration Permit from the Washington State Department of Natural Resources (WSDNR) for invasive exploration or drilling. Operations that require an exploration or drilling permit will also require the developer to initiate the State Environmental Policy Act (SEPA). In Washington geothermal resources are regulated under Chapter 78.60 RCW

308

GRR/Section 3-WA-d - State Land Lease | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-d - State Land Lease GRR/Section 3-WA-d - State Land Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-d - State Land Lease 3-WA-d - State Land Lease.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-13-020 RCW 79-13-140 RCW 79-13-150 WAC 332-22-030 WAC 332-22-105 WAC 332-22-110 Triggers None specified This flowchart illustrates the process used to lease state lands in Washington. The Washington State Department of Natural Resources (WSDNR) oversees the land leasing process through the Commissioner of Public Lands ("commissioner"). The WSDNR may lease state lands for purposes it deems advisable, including commercial, industrial, residential, agricultural, and

309

GRR/Section 3-WA-c - Utility Franchise or Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-WA-c - Utility Franchise or Permit Process GRR/Section 3-WA-c - Utility Franchise or Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-c - Utility Franchise or Permit Process 3-WA-c - Utility Franchise or Permit Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Department of Transportation Regulations & Policies WAC 468-34-060 WAC 468-34-080 WAC 468-34-110 WAC 468-34-160 WAC 468-34-170 Triggers None specified This flowchart illustrates the process of obtaining a franchise or permit through a state highway right of way in Washington State. A utility permit or franchise is required for occupancy of a highway right of way by utility facilities, including private lines. WAC 468-34-160. The process is

310

GRR/Section 19-WA-b - New Water Right Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-WA-b - New Water Right Permit Process GRR/Section 19-WA-b - New Water Right Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-b - New Water Right Permit Process 19-WA-b - New Water Right Permit Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 Triggers None specified Washington uses a prior appropriation system for the distribution of both surface water and ground water rights in which water users receive the right to use water on a "first in time, first in right" basis. Under Washington law, the waters of Washington belong collectively to the public

311

GRR/Section 19-WA-c - Transfer or Change of Water Right | Open Energy  

Open Energy Info (EERE)

9-WA-c - Transfer or Change of Water Right 9-WA-c - Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-c - Transfer or Change of Water Right 19-WA-c - Transfer or Change of Water Right.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.03.380 Revised Code of Washington 90.44.100 Revised Code of Washington Chapter 90.80 Triggers None specified Much of Washington's public waters have been accounted for through water right claims, permits, or certificates. As a result, many individuals seeking water rights try to acquire existing water rights already in use or change the use of a current water right they already hold. Certain elements

312

GRR/Section 3-WA-a - State Geothermal Lease | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-a - State Geothermal Lease GRR/Section 3-WA-a - State Geothermal Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-a - State Geothermal Lease 3-WA-a State Geothermal Lease.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Chapter 79.14 RCW Chapter 344-12 WAC Triggers None specified The State of Washington is still in the process of developing and finalizing the rules and regulations related to geothermal leases on state lands; however, the Washington State Department of Natural Resources (WSDNR) expects the process to be similar to the process for leasing state lands for oil and natural gas development. The rules and regulations for

313

GRR/Section 11-WA-c - Archaeological Resource Discovery Process | Open  

Open Energy Info (EERE)

GRR/Section 11-WA-c - Archaeological Resource Discovery Process GRR/Section 11-WA-c - Archaeological Resource Discovery Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-c - Archaeological Resource Discovery Process 11-WA-c - Archaeological Resource Discovery Process.pdf Click to View Fullscreen Triggers None specified In the state of Washington, cultural resource concerns are integrated as early as possible into the planning for capital projects and are protected if discovered during construction. Washington defines "Cultural resources" as archeological and historical sites and artifacts, and traditional areas or items of religious, ceremonial and social uses to affected tribes. Washington defines an "Archaeological resource" as any

314

Advance Patent Waiver W(A)2012-005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Advance Patent Waiver W(A)2012-005 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

315

Advance Patent Waiver W(A)2012-013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 Advance Patent Waiver W(A)2012-013 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

316

Advance Patent Waiver W(A)2012-018 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Advance Patent Waiver W(A)2012-018 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

317

Advance Patent Waiver W(A)2012-031 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Advance Patent Waiver W(A)2012-031 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

318

Advance Patent Waiver W(A)2012-004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 Advance Patent Waiver W(A)2012-004 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

319

Advance Patent Waiver W(A)2012-002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Advance Patent Waiver W(A)2012-002 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

320

Advance Patent Waiver W(A)2012-033 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Advance Patent Waiver W(A)2012-033 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Advance Patent Waiver W(A)2012-029 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Advance Patent Waiver W(A)2012-029 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

322

Advance Patent Waiver W(A)2012-030 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30 Advance Patent Waiver W(A)2012-030 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

323

Advance Patent Waiver W(A)2012-016 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Advance Patent Waiver W(A)2012-016 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

324

Advance Patent Waiver W(A)2012-019 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Advance Patent Waiver W(A)2012-019 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

325

Advance Patent Waiver W(A)2012-032 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32 Advance Patent Waiver W(A)2012-032 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

326

Advance Patent Waiver W(A)2012-007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07 Advance Patent Waiver W(A)2012-007 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to practice by...

327

WA_1994_004_ALUMINUM_COMPANY_OF_AMERICA_Waiver_of_Domestic_a...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MPANYOFAMERICAWaiverofDomestica.pdf More Documents & Publications WA1993034CONSOLIDATEDNATURALGAS(CNG)WaiverofDomesti.pdf ClassWaiverWC-2000-004.pdf DOE M 483.1-1...

328

GRR/Section 19-WA-d - Water Conservancy Board Transfer or Change...  

Open Energy Info (EERE)

19-WA-d - Water Conservancy Board Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of...

329

Advance Patent Waiver W(A)2009-069 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-069 Advance Patent Waiver W(A)2009-069 This document waives certain patent rights the Department of Energy (DOE) has to inventions conceived or first actually reduced to...

330

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1)  

Energy.gov (U.S. Department of Energy (DOE))

DOE referred the matter of Fisher & Paykel Appliances residential clothes washer, model WA42T26GW1, to the EPA for appropriate action after DOE testing showed that the model does not meet the ENERGY STAR specification.

331

GRR/Section 14-WA-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-c - Underground Injection Control Permit GRR/Section 14-WA-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-c - Underground Injection Control Permit 14-WA-c - Underground Injection Control Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Chapter 173-218 WAC Non-endangerment Standard Triggers None specified The Safe Drinking Water Act requires Washington to implement technical criteria and standards to protect underground sources of drinking water from contamination. Under Chapter 173-218 WAC, the Washington State Department of Ecology (WSDE) regulates and permits underground injection control (UIC) wells in Washington. The Environmental Protection Agency

332

GRR/Section 19-WA-a - Water Access and Water Rights Overview | Open Energy  

Open Energy Info (EERE)

9-WA-a - Water Access and Water Rights Overview 9-WA-a - Water Access and Water Rights Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-a - Water Access and Water Rights Overview 19-WA-a - Water Access and Water Rights Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 RCW 90.44.050 Triggers None specified Similar to many western states, only a small amount of water is available for appropriation in Washington. As a result, Washington has developed a comprehensive regulatory scheme for the distribution of water rights and use of water in the state. Washington employs a prior appropriation or

333

Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation  

SciTech Connect

Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.

Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States); Mittelstadt, W.A. [Bonneville Power Administration, Portland, OR (United States); Piwko, R.J. [General Electric Co., Schenectady, NY (United States); Damsky, B.L. [Electric Power Research Inst., Palo Alto, CA (United States); Eden, J.D. [Portland General Electric, OR (United States)

1996-05-01T23:59:59.000Z

334

Ballard Library and Neighborhood Service Center - Seattle, WA by Bohlin Cywinski Jackson Architects [EDRA/Places Awards 2008 -- Design  

E-Print Network (OSTI)

Bohlin Cywinski Jackson Architects / Ballard Library 2008WA Bohlin Cywinski Jackson Architects Seattle residents loveService Center, the architects, Bohlin Cywinski Jackson,

Merlino, Kathryn Rogers

2008-01-01T23:59:59.000Z

335

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report  

SciTech Connect

This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on February 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.

Lu, Shuai; Makarov, Yuri V.

2009-04-01T23:59:59.000Z

336

GRR/Section 15-WA-b - Air Operating Permit | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 15-WA-b - Air Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-b - Air Operating Permit 15-WA-b - Air Operating Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-401-500 WAC 173-401-800 WAC 173-401-810 WAC 173-401-735 WAC 173-401-610 Triggers None specified This flowchart illustrates the process for obtaining an Air Operating Permit in Washington State. The Washington State Department of Ecology (WSDE) issues Air Operating Permit under WAC 173-401. An Air Operating Permit is required if a facility has the potential to emit

337

GRR/Section 7-WA-a - Energy Facility Siting Process | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 7-WA-a - Energy Facility Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-WA-a - Energy Facility Siting Process 7-WA-a - Energy Facility Siting Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Energy Facility Site Evaluation Council Regulations & Policies RCW 80.50.60(1) WAC 463-60 RCW 80.50.090(2) WAC 463-30-270 WAC 463-30-320 Triggers None specified Under RCW 80.50.60(1) a developer may not begin construction of a new energy facility site until they obtain Energy Facility Siting certification

338

GRR/Section 11-WA-b - Human Remains Process | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 11-WA-b - Human Remains Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-b - Human Remains Process 11-WA-b - Human Remains Process (1).pdf Click to View Fullscreen Triggers None specified This flowchart illustrates the necessary procedure when a developer discovers human remains on a project site. In Washington, every person has the duty to notify the coroner upon the discovery of any human remains in the most expeditious manner possible. The Washington Department of Archaeology and Historic Preservation (DAHP) handles the disposition of non-forensic remains, while the county coroner handles the disposition of

339

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA 49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA SUMMARY This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet

340

GRR/Section 9-WA-a - State Environmental Overview | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 9-WA-a - State Environmental Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-a - State Environmental Overview 9-WA-a - State Environmental Overview.pdf Click to View Fullscreen Triggers None specified The Washington State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. Washington uses an Environmental Checklist and Environmental Review (ER) to provide information to help government agencies identify impacts from their proposals and determine whether an Environmental Impact Statement (EIS) is necessary.

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

MEMORANDUM : APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A) : APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A) 2009-047 GRANTED FOR US SOLAR HOLDINGS LLC UNDER AGREEMENT NO. DE-FC36-08G018 155 US Solar Holdings LLC ("US Solar") has requested that the Department of Energy ("DOE") modify or clarify the cost share requirements set forth in the statement of considerations for the granted advance patent waiver W(A) 2009-047. Specifically, the statement of considerations, as originally granted, states the following: The total cost of the award is approximately $4 million with the Petitioner providing about 50% cost sharing. This waiver is contingent upon the Petitioner maintaining, in aggregate, the above cost sharing percentage over the course of the agreement. Rather than just provide an aggregate cost share requirement of 50% for the agreement, US Solar

342

BPA-Solicited Technical Review of "Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline", Technical Report 2004.  

DOE Green Energy (OSTI)

The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and cooler (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and [making it] more beneficial to anadromous [fish]'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with completion of the final 2 phases of the project.

Morgan, David

2004-02-01T23:59:59.000Z

343

GRR/Section 18-WA-b - Dangerous Waste Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 18-WA-b - Dangerous Waste Permit GRR/Section 18-WA-b - Dangerous Waste Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-b - Dangerous Waste Permit 18-WA-b - Dangerous Waste Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-303-020 WAC 173-303-060 WAC 173-303-070 WAC 173-303-071 WAC 173-303-072 WAC 173-303-081 WAC 173-303-082 WAC 173-303-090 WAC 173-303-100 WAC 173-303-110 WAC 173-303-140 WAC 173-303-220 WAC 173-303-281 WAC 173-303-282 WAC 173-303-803 WAC 173-303-845 Triggers None specified The Washington State Department of Ecology (WSDE) oversees the permitting process for dangerous and solid waste. In Washington, a developer must obtain a permit if they handle dangerous waste and solid waste and are

344

W(A)-02-009, CONSOL ENERGY, INC. CLOSED PER INSTRUCTIONS FROM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-02-009, CONSOL ENERGY, INC. CLOSED PER INSTRUCTIONS FROM MIKE HOFFMAN ON 8262003. SEE W(A)-02-053. JPN 08 2002 07:00 FR IPL DOE CH 630 252 2779 TO AGCP-HQ P.1010 * * Hi Katie,...

345

Qi-Wa, a problem that has plagued Chinese scrolls for millenniums  

E-Print Network (OSTI)

Qi-Wa refers to the up curl on the lengths of handscrolls and hanging scrolls, which has troubled Chinese artisans and emperors for as long as the art of painting and calligraphy exists. This warp is unwelcomed not only for aesthetic reasons, but its potential damage to the fiber and ink. Although it is generally treated as a part of the cockling and curling due to climate, mounting procedures, and conservation conditions, we emphasize that the intrinsic curvature incurred from the storage is in fact the main cause of Qi-Wa. The Qi-Wa height is determined by experiments to obey scaling relations with the length, width, curvature, and thickness of the scroll, which are supported by Molecular Dynamics Simulation and theoretic derivations. This understanding helps us come up with plausible remedies to mitigate Qi-Wa. All proposals are tested on real mounted paper and in simulations. Due to the general nature of this warp, we believe the lessons learnt from studying ancient Chinese scrolls can be applied to moder...

Chou, Ming-Han; Wang, Yi-Ping; Hong, Sun-Hsin; Hong, Tzay-Ming

2013-01-01T23:59:59.000Z

346

Testing Buda-Lund hydro model on particle correlations and spectra in NA44, WA93 and WA98 heavy ion experiments  

E-Print Network (OSTI)

Analytic and numerical approximations to a hydrodynamical model describing longitudinally expanding, cylindrically symmetric, finite systems are fitted to preliminary NA44 data measured in 200 AGeV central $S + Pb$ reactions. The model describes the measured spectra and HBT radii of pions, kaons and protons, simultaneously. The source is characterized by a central freeze-out temperature of T_0 = 154 +/- 8 +/- 11 MeV, a "surface" temperature of T_r = 107 +/- 28 +/- 18 MeV and by a well-developed transverse flow, = 0.53 +/- 0.17 +/- 0.11. The transverse geometrical radius and the mean freeze-out time are found to be R_G = 5.4 +/- 0.9 +/- 0.7 fm and tau_0 = 5.1 +/- 0.3 +/- 0.3 fm/c, respectively. Fits to preliminary WA93 200 AGeV S + Au and WA98 158 AGeV Pb + Pb data dominated by pions indicate similar model parameters. The absolute normalization of the measured particle spectra together with the experimental determination of both the statistical and the systematic errors were needed to obtain successful fits.

A. Ster; T. Csorgo; B. Lorstad

1998-09-28T23:59:59.000Z

347

Anemometer Data (Wind Speed, Direction) for Quinault #3, WA (2004 - 2005) |  

Open Energy Info (EERE)

Quinault #3, WA (2004 - 2005) Quinault #3, WA (2004 - 2005) Dataset Summary Description Wind data collected from Quinault Indian Reservation in Washington from an anemometer as part of the Native American anemometer loan program. Monthly mean wind speed is available for 2004 through 2005, as is wind direction and turbulence data. Data is reported from a height of 20 m. The data was originally made available by Wind Powering America, a DOE Office of Energy Efficiency & Renewable Energy (EERE) program. A dynamic map displaying all available data from DOE anemometer loan programs is available http://www.windpoweringamerica.gov/anemometerloans/projects.asp. Source EERE Date Released December 02nd, 2010 (4 years ago) Date Updated December 02nd, 2010 (4 years ago) Keywords wind

348

Intelligent Sootblowing Demonstration at Texas Glenco's W.A. Parish Plant  

Science Conference Proceedings (OSTI)

Intelligent sootblowing (ISB) optimizes the cleaning of the walls and convection passes of fossil-fired power plants to maintain high heat transfer while keeping steam temperatures and pressures as constant as possible and minimizing erosion or corrosion of tubes. This document is the second in a series of interim reports on the five-year ISB system test and demonstration project at Texas Genco's W.A. Parish plant. It summarizes ISB performance test results, outage inspection findings, and potential enha...

2003-12-09T23:59:59.000Z

349

Intelligent Sootblowing Demonstration at Texas Genco's W.A. Parish Plant  

Science Conference Proceedings (OSTI)

Intelligent sootblowing (ISB) optimizes the cleaning of the walls and convection passes of fossil-fired power plants to maintain high heat transfer while keeping steam temperatures and pressures as constant as possible and minimizing erosion or corrosion of tubes. This document is the third in a series of interim reports on the five-year ISB system test and demonstration project at Texas Genco's W.A. Parish plant. Work in 2004 focused on quantifying cost savings associated with the long-term operation of...

2004-12-15T23:59:59.000Z

350

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

351

File:EIA-Eastern-OR-WA-BOE.pdf | Open Energy Information  

Open Energy Info (EERE)

Eastern-OR-WA-BOE.pdf Eastern-OR-WA-BOE.pdf Jump to: navigation, search File File history File usage Eastern Oregon and Washington By 2001 BOE Reserve Class Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 460 KB, MIME type: application/pdf) Description Eastern Oregon and Washington By 2001 BOE Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional Countries United States UN Region Northern America States Oregon, Washington File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 18:00, 20 December 2010 Thumbnail for version as of 18:00, 20 December 2010 1,650 × 1,275 (460 KB) MapBot (Talk | contribs) Automated bot upload

352

File:06-WA-b - Washington Construction Storm Water Permit.pdf | Open Energy  

Open Energy Info (EERE)

File File Edit History Facebook icon Twitter icon » File:06-WA-b - Washington Construction Storm Water Permit.pdf Jump to: navigation, search File File history File usage Metadata File:06-WA-b - Washington Construction Storm Water Permit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 60 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:28, 6 December 2013 Thumbnail for version as of 15:28, 6 December 2013 1,275 × 1,650, 2 pages (60 KB) Alevine (Talk | contribs) 15:25, 6 December 2013 Thumbnail for version as of 15:25, 6 December 2013 1,275 × 1,650, 2 pages (60 KB) Alevine (Talk | contribs)

353

Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.  

Science Conference Proceedings (OSTI)

The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

United States. Bonneville Power Administration.

1985-04-01T23:59:59.000Z

354

Electrical Energy Conservation Analyses of the Wood Products (SIC24) Industry in the BPA Service Sistrict : Mill Summary Report : Champion International Corporation, Roseburg, Oregon.  

Science Conference Proceedings (OSTI)

This report presents the partial results of a study conducted by Trans Energy Systems Industrial Division of URS Company for the Bonneville Power Administration (BPA) under contract AC79-84BP18946. The objective of this effort was an electrical energy conservation analysis of the Wood Products Industry (Standard Industrial Code (SIC) 24) in the BPA service district. The analysis was conducted by selecting five representative mills in the BPA service area and performing electrical energy conservation surveys and analyses of these mills. This report presents the results of data gathering and analysis at the Champion International Corporation plywood mill in Roseburg, Oregon, which produces exterior, interior, sanded and tongue and groove/shiplap softwood plywood. The plant produces 170 million square feet of 3/8-inch basis plywood annually. Species processed include Douglas fir and hemlock. This report summarizes the mill data collected, the technical and economic analyses performed, the strategy used in ranking the individual electrical energy conservation opportunities found in each mill, the recommended energy conservation measures (ECM), the projected cost benefits of each ECM and the estimated impacts of each ECM on plant production and operation.

TransEnergy Systems, Inc.

1985-01-01T23:59:59.000Z

355

DOE Challenge Home Case Study TC Legend, Seattle, WA, Custom Home  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TC Legend TC Legend Homes Seattle, WA BUILDING TECHNOLOGIES OFFICE DOE Challenge Home builders are in the top 1% of builders in the country meeting the extraordinary levels of excellence and quality specifi ed by the U.S. Department of Energy. Every DOE Challenge Home starts with ENERGY STAR for Homes Version 3 for an energy-effi cient home built on a solid foundation of building science research. Then, even more advanced technologies are designed in for a home that goes above and beyond current code to give you the superior quality construction, HVAC, appliances, indoor air quality, safety, durability, comfort, and solar-ready components along with ultra-low or no utility bills. This provides homeowners with a quality home that will last for generations to come.

356

Recipient: County of Kitsap, WA ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

it: EE 000 0853 it: EE 000 0853 Recipient: County of Kitsap, WA ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Kitsap Built Green Projects B5.1 Waste Stream, Engineering, and Historic Preservation clauses. Kitsap County Building Retrofits and Energy Efficiency Upgrades (Green Jobs Initiative) B5.1 except geothermal Waste Stream, Engineering, and Historic Preservation clauses. Prohibited: Any implementation of geothermal projects/construction activities without NEPA approval from DOE. Geothermal projects are to be provided to DOE for analysis. Energy Efficiency Implementation and Strategy A9, All, B5.1 None Energy Services Corps A9, All, B5.1

357

DOE Challenge Home Case Study, Dwell Development, Seattle, WA, Systems Home  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dwell Dwell Development Seattle, WA BUILDING TECHNOLOGIES OFFICE DOE Challenge Home builders are in the top 1% of builders in the country meeting the extraordinary levels of excellence and quality specifi ed by the U.S. Department of Energy. Every DOE Challenge Home starts with ENERGY STAR for Homes Version 3 for an energy-effi cient home built on a solid foundation of building science research. Then, even more advanced technologies are designed in for a home that goes above and beyond current code to give you the superior quality construction, HVAC, appliances, indoor air quality, safety, durability, comfort, and solar-ready components along with ultra-low or no utility bills. This provides homeowners with a quality home that will last for generations to come.

358

DOE Challenge Home Case Study, Clifton View Homes, Coupeville, WA, Systems Home  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clifton View Clifton View Homes Coupeville, WA BUILDING TECHNOLOGIES OFFICE DOE Challenge Home builders are in the top 1% of builders in the country meeting the extraordinary levels of excellence and quality specifi ed by the U.S. Department of Energy. Every DOE Challenge Home starts with ENERGY STAR for Homes Version 3 for an energy-effi cient home built on a solid foundation of building science research. Then, even more advanced technologies are designed in for a home that goes above and beyond current code to give you the superior quality construction, HVAC, appliances, indoor air quality, safety, durability, comfort, and solar-ready components along with ultra-low or no utility bills. This provides homeowners with a quality home that will last for generations to come.

359

Measurements of Turbulence at Two Tidal Energy Sites in Puget Sound, WA  

SciTech Connect

Field measurements of turbulence are pre- sented from two sites in Puget Sound, WA (USA) that are proposed for electrical power generation using tidal current turbines. Rapidly sampled data from multiple acoustic Doppler instruments are analyzed to obtain statistical mea- sures of fluctuations in both the magnitude and direction of the tidal currents. The resulting turbulence intensities (i.e., the turbulent velocity fluctuations normalized by the harmonic tidal currents) are typically 10% at the hub- heights (i.e., the relevant depth bin) of the proposed turbines. Length and time scales of the turbulence are also analyzed. Large-scale, anisotropic eddies dominate the energy spectra, which may be the result of proximity to headlands at each site. At small scales, an isotropic turbulent cascade is observed and used to estimate the dissipation rate of turbulent kinetic energy. Data quality and sampling parameters are discussed, with an emphasis on the removal of Doppler noise from turbulence statistics.

Thomson, Jim; Polagye, Brian; Durgesh, Vibhav; Richmond, Marshall C.

2012-06-05T23:59:59.000Z

360

BPA Riparian Fencing and Alternative Water Development Projects Completed within Asotin Creek Watershed, 2000 and 2001 Asotin Creek Fencing Final Report of Accomplishments.  

DOE Green Energy (OSTI)

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in Water Resource Inventory Area (WRIA) 35. According to Washington Department of Fish and Wildlife's (WDFW) Priority WRIA's by ''At-Risk Stock Significance Map'', it is the highest priority WRIA in southeastern Washington. Summer steelhead, bull trout, and Snake River spring chinook salmon which are listed under the Endangered Species Act (ESA), are present in the watershed. WDFW manages it as a Wild Steelhead Reserve; no hatchery fish have been released here since 1997. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe, Washington Department of Ecology (DOE), National Marine Fisheries Service (NMFS), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. Local students, volunteers and Salmon Corps members from the Nez Perce Tribe have been instrumental in the success of the Model Watershed Program on Asotin Creek. ACCD began coordinating habitat projects in 1995 with the help of BPA funding. Approximately two hundred and seventy-six projects have been implemented as of 1999. The Washington State Legislature was successful in securing funding for endangered salmon and steelhead recovery throughout the State in 1998. While these issues were new to most of the State, the ACCD has been securing and administering funding for endangered salmonids since 1994. The ''Asotin Creek Riparian Planting 2000-053-00 and Asotin Creek Riparian Fencing 2000-054-00'' teamed BPA and the Governor's Salmon Recovery Funding to plant approximately 84,191 trees and shrubs in the Asotin Creek Watershed. In addition BPA and private cost-share dollars were utilized to drill 3 wells, provide 15 off-site alternative water developments (troughs), 5 spring developments, and 9,100 feet of riparian fencing. The trees will provide shade and long-term LWD recruitment to the stream. The wells, alternative water developments, springs and fencing will reduce direct animal impacts on the stream. In one area alone, a well, 3,000 ft of riparian fence with 5 alternative water developments will exclude 300 head of cattle from using the stream as a source of drinking water during the winter months.

Johnson, B.J. (Bradley J.)

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

362

Application of a modified denitrifying bacteria method for analyzing groundwater and vadose zone pore water nitrate at the Hanford Site, WA, USA.  

E-Print Network (OSTI)

zone pore water nitrate at the Hanford Site, WA, USA. Woods,and Conrad, Mark The Hanford Site in southern WashingtonL have been reported for Hanford groundwaters, where nitrate

Woods, Katharine N.; Singleton, Michael J.; Conrad, Mark

2003-01-01T23:59:59.000Z

363

A WASHINGTON STATE UNIVERSITY POSTDOCTORAL POSITION FOR WORK AT LIGO HANFORD, WA Applications are invited for a postdoctoral position in the Gravity Group at the Department of Physics  

E-Print Network (OSTI)

A WASHINGTON STATE UNIVERSITY POSTDOCTORAL POSITION FOR WORK AT LIGO HANFORD, WA Applications characterization for the Advanced Laser Interferometer Gravitational wave Observatory (LIGO) at the Hanford site characterization at the LIGO Hanford observatory. Familiarity with data analysis pipelines for searching

Collins, Gary S.

364

W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

W.A. W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project Final Environmental Impact Statement Summary February 2013 DOE/EIS-0473 Office of Fossil Energy National Energy Technology Laboratory INTENTIONALLY LEFT BLANK COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Title: W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473) Location: Southeastern Texas, including Fort Bend, Wharton, and Jackson counties Contacts: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act, contact: Mark W. Lusk U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road Morgantown, WV 26507-0880 (304) 285-4145 or Mark.Lusk@netl.doe.gov

365

W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Final Environmental Impact Statement (DOE/EIS-0473)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NRG W.A. PARISH PCCS PROJECT NRG W.A. PARISH PCCS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT APPENDIX H. BEG MODELING REPORT APPENDIX H BEG MODELING REPORT DOE/EIS-0473 NRG W.A. PARISH PCCS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT APPENDIX H. BEG MODELING REPORT INTENTIONALLY LEFT BLANK 1 Reservoir modeling and simulation for estimating migration extents of injectate-CO 2 in support of West Ranch oilfield NEPA/EIS Gulf Coast Carbon Center, Bureau of Economic Geology, Jackson School of Geosciences, The University of Texas at Austin May 4, 2012 Summary It is anticipated that anthropogenic carbon dioxide (CO2-A) will be injected into the deep (5,000-6,000 ft below sea level) subsurface for enhanced oil recovery (EOR) at the West Ranch oilfield beginning in early 2015. The purpose of this report is to present reservoir modeling and simulation

366

Blaine County, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

8°, -113.9664446° 8°, -113.9664446° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.4743428,"lon":-113.9664446,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

367

Blaine County, Montana: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

108.9462246° 108.9462246° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.6065395,"lon":-108.9462246,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

368

Arrival time and magnitude of airborne fission products from the Fukushima, Japan, reactor incident as measured in Seattle, WA, USA  

E-Print Network (OSTI)

We report results of air monitoring started due to the recent natural catastrophe on 11 March 2011 in Japan and the severe ensuing damage to the Fukushima Dai-ichi nuclear reactor complex. On 17-18 March 2011, we registered the first arrival of the airborne fission products 131-I, 132-I, 132-Te, 134-Cs, and 137-Cs in Seattle, WA, USA, by identifying their characteristic gamma rays using a germanium detector. We measured the evolution of the activities over a period of 23 days at the end of which the activities had mostly fallen below our detection limit. The highest detected activity amounted to 4.4 +/- 1.3 mBq/m^3 of 131-I on 19-20 March.

J. Diaz Leon; D. A. Jaffe; J. Kaspar; A. Knecht; M. L. Miller; R. G. H. Robertson; A. G. Schubert

2011-03-24T23:59:59.000Z

369

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

370

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Energy Storage Pilots  

E-Print Network (OSTI)

Storage ­ Not just batteries! #12;B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 · Installed and storage · Small-scale battery energy storage · Load increase using aquifer recharge opportunities #12;B O operational costs for deep well pumping. This has several benefits including helping BPA to address

371

BPA_EA_Covers.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boyer-Tillamook Access Road Improvement Project Preliminary Environmental Assessment September 2013 DOE/EA-1941 This page intentionally left blank. Boyer-Tillamook Access Road Improvement Project i September 2013 TABLE OF CONTENTS CHAPTER 1 Purpose of and Need for Proposed Action 1-1 1.1 Background 1-1 1.2 Need for Action 1-3 1.3 Purposes 1-3 1.4 Public Involvement 1-3 1.4.1 Scoping Comment Period 1-3 1.4.2 Preliminary EA Comment Period 1-4 CHAPTER 2 Proposed Action and Alternatives 2-1 2.1 Proposed Action 2-1 2.1.1 Roads 2-2 2.1.2 Retaining Wall Construction 2-10 2.1.3 Bridge and Arch Pipe Construction 2-11

372

Next Update: October 2010  

Gasoline and Diesel Fuel Update (EIA)

ID Burns, OR -260 IPC US WECC - AC 400-599 500 3000 6 2013 Walters Ferry, ID Boardman, OR 300 IPC US WECC - AC 400-599 500 12 2013 Clyde, WA Central Ferry, WA 40 BPA US...

373

20121114 Riverton drinking wa...  

Office of Legacy Management (LM)

Where Does My Drinking Water Come From? Where Does My Drinking Water Come From? Riverton, Wyoming, Processing Site F A C T S H E E T ENERGY Legacy Management U.S. DEPARTMENT OF This fact sheet provides information about the Alternative Water Supply System and domestic wells at the Uranium Mill Tailings Radiation Control Act of 1978 Title I processing site at Riverton, Wyoming. The Riverton site is managed by the U.S. Department of Energy Office of Legacy Management. Where Is the Riverton Site? The former Riverton, Wyoming, Processing Site is in Fremont County, 2 miles southwest of the town of Riverton and within the boundaries of the Wind River Indian Reservation (Northern Arapaho and Eastern Shoshone). Why Is It a "Site"? A uranium- and vanadium-ore-processing mill operated on the property from 1958 to 1963. Milling operations created

374

Formulation and Characterization of LX-17-2 from new FK 800 binder and WA, ATK, and BAE TATBs  

Science Conference Proceedings (OSTI)

Currently LLNL has no Kel-F 800 or wet-aminated TATB reserves for formulation. Although both materials are soon to be commercially available, their synthesis processes have changed and the explosive must be re-evaluated. In 2000 3M phased out the uses of perfluorooctanoyl (C8) derivatives due to environmental persistence and bioaccumulation issues. A C8 derivative was used as an emulsifier for making Kel F-800. In 2001 Kel F-800 was scheduled to be discontinued and the last Kel F-800 run was made in early 2002. LANL ordered 2M$ worth of Kel-F 800 for reserves and Pantex purchased several hundred pounds to satisfy mock needs. After four years, 3M has decided to introduce a Kel-F 800-like polymer based on a new emulsifier using the same chlorotrifluoroethylene and vinylidene fluoride monomers and emulsion polymerization process. They have produced 3 batches and claim the 'new' FK-800 is indistinguishable from the 'old' Kel-F 800 in any of their testing parameters. In June-July 2006 3M scaled up a batch of about 800 pounds and have test quantities available. We have samples of the new FK-800 for evaluation. Neither wet nor dry-aminated TATB has been synthesized in the US in any significant quantity since about 1985 and significant quantities of LX-17-1 has not been formulated since about 1990. Over the last few years as part of a DOD MANTECH, ATK Thiokol and BAE Holston Army Ammunition Plant (HAAP) have produced moderate quantities of TATB ({approx}5 kg batches) with plans to scale up for DOD applications. Thiokol TATB is polycrystalline with an average particle size of about 40 m (similar to WA TATB) but HAAP TATB is only 5-6 {micro}m (similar to ultrafine). We have obtained small quantities of these materials for evaluation. The project (1) compares new FK-800 with old Kel-F 800 and FK-800 lots currently available at LLNL, (2) compares and characterizes new TATB with old TATB, (3) formulates new FK-800 with wet-aminated TATB and new TATBs in according to HAAP slurry coating procedure into LX-17-2, and (4) evaluates the mechanical and detonation performance characteristics of this insensitive high explosive (IHE). Priorities are to prove that these new materials can be formulated, pressed to density and machined; and that they contain no impurities which might cause compatibility issues. Since 3M, LANL, Pantex and AWE are currently evaluating the new FK-800, we plan to share data rather than repeating their work. Our effort is described.

DePiero, S C; Hoffman, D M

2007-08-03T23:59:59.000Z

375

Wa s h i n g t o n Ma r r i o t t e n Me t r o C e...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wa s h i n g t o n Ma r r i o t t e n Me t r o C e n t e r F a c u l t a d d e D e r e c h o d e l a U n i v e r s i d a d d e H o w a r d C o n f e r e n c i a y P r o g r a ma d...

376

STATEM!NT''OF CONSIDEAAT10NS REQUEST n:~!:)lHi/",!!,'fCORPORArIQN FO~ ANADVANClWA1VER OF DOMESTIC AND FOREIGN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEM!NT''OF CONSIDEAAT10NS STATEM!NT''OF CONSIDEAAT10NS REQUEST n:~!:)lHi/",!!,'fCORPORArIQN FO~ ANADVANClWA1VER OF DOMESTIC AND FOREIGN DOE PROPOSAL NO.OE-EE0000412 W(A} 2009-:060 The OhlipC1'!ve of this project Is the and comt'nercialization of a two-phase soluttofrfQf USe with The 1 lM,C'l_""""P H'tn(;lPI'" PJJ1'l.nn""". refrig1':'rant tooling solution provides certain improvements compared to conventional air-<:ooling syslems and water-cooling systems, The totalantfetpated cost the is $901,678 with the Petitl(};l)er approximately 19.% cost sm:tre, $262,191. Thiswaive(is contingent upo.n the Petitioner rrH~intaining the foregoing cost over tneCQUfse the grant As in its wai'\l\;f petition, the ~etitfoner isa leading global supplier of air conditioning and

377

Characterization of the environmental fate of Bacillus thuringiensis var. kaurstaki (Btk) after pest eradication efforts in Seattle, WA and Fairfax county, VA  

SciTech Connect

Understanding the fate of biological agents in the environment will be critical to recovery and restoration efforts after a biological attack. Los Alamos National Laboratory (LANL) is conducting experiments in the Seattle, WA and Fairfax County, VA areas to study agent fate in urban environments. As part of their gypsy moth suppression efforts, Washington State and Fairfax County have sprayed Bacillus thuringiensis var. kurstaki (Btk), a common organic pesticide for decades. Many of the spray zones have been in or near urban areas. LANL has collected surface and bulk samples from historical Seattle spray zones to characterize how long Btk persists at detectable levels in the environment, and how long it remains viable in different environmental matrices. This work will attempt to address three questions. First, how long does the agent remain viable at detectable levels? Second, what is the approximate magnitude and duration of resuspension? And third, does the agent transport into buildings? Data designed to address the first question will be presented. Preliminary results indicate Btk remains viable in the environment for at least two years.

Ticknor, Lawrence [Los Alamos National Laboratory; Van Cuyk, Sheila M [Los Alamos National Laboratory; Deshpande, Alina [Los Alamos National Laboratory; Omberg, Kristin M [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

378

Microsoft Word - BPA Personal Property.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Office of Inspector General Office of Audit Services Audit Report Management Controls over the Bonneville Power Administration's Personal Property Accountability OAS-M-08-01 October 2007 Department of Energy vvasnlngron, UL LUSU:, October 1 , 2007 MEMORANDUM FOR TQ-YADMINISTRATOR, BONNEVILLE POWER ADNIINISTRATION [?L&& < / ( ' F'IIOM. or" Collard / Assistant Inspector General for Performance Audits Office of Inspector General INFORMATION: Audit Report on "Management Controls over the Bonneville Power Administration's Personal PI-opesly Accountability" Bonncvillc Power Administration (Bonnev~lle) is responsible for marketing, selling, and transniitting power produced from the Federal Columbia River Power System. To fuliill

379

FINAL Weatherford-BPA_Seismic.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

69 69 Weatherford Inclined Wellbore Construction Final Report for the Period May 9, 2002 - May 31, 2002 Date Published: August 19, 2002 R. Schulte PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY/ROCKY MOUNTAIN OILFIELD TESTING CENTER Work Performed Under Rocky Mountain Oilfield Testing Center (RMOTC) CRADA No. 2002-016 Distribution A - Approved for public release; further dissemination unlimited (Unclassified) 1 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the U. S. Government nor any agency thereof, nor any of their employees, make any warranty, expressed or implied, nor assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

380

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1994.html[6/27/2011 11:54:25 AM] Summary-1994.html[6/27/2011 11:54:25 AM] TABLE OF CONTENTS Section Page S.0 SUMMARY S-1 S.1 INTRODUCTION S-1 S.2 PURPOSE OF AND NEED FOR ACTION S-1 S.2.1 Need S-1 S.2.2 Purpose S-4 S.3 BACKGROUND S-4 S.4 ALTERNATIVES INCLUDING THE PROPOSED ACTION S-5 S.4.1 Proposed Action S-5

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Elliot Mainzer, BPA Ken Dragoon, NWPCCg  

E-Print Network (OSTI)

reduction equivalent to removing 1 million cars. ­ Nitrogen oxide emissions reduced 450 tons 6 NationalPossible increased wear and tear on balancing units, especially hydro. A better understanding of these impacts

382

PIA - Sunflower (BPA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009...

383

Geothermal resource analysis in the Big Wood River Valley, Blaine County, Idaho  

DOE Green Energy (OSTI)

A geochemical investigation of both thermal and nonthermal springs in the Wood River area was conducted to determine possible flowpaths, ages of the waters, and environmental implications. Seven thermal springs and five cold springs were sampled for major cations and anions along with arsenic, lithium, boron, deuterium and oxygen-18. Eight rocks, representative of outcrops at or near the thermal occurrences were sampled and analyzed for major and trace elements. The Wood River area hydrothermal springs are dilute Na-HCO{sub 3}-SiO{sub 2} type waters. Calculated reservoir temperatures do not exceed 100{degree}C, except for Magic Hot Springs Landing well (108{degree}C with Mg correction). The isotope data suggest that the thermal water is not derived from present-day precipitation, but from precipitation when the climate was much colder and wetter. Intrusive igneous rocks of the Idaho batholith have reacted with the hydrothermal fluids at depth. The co-location of the thermal springs and mining districts suggests that the structures acting as conduits for the present-day hydrothermal fluids were also active during the emplacement of the ore bodies.

Street, L.V.

1990-10-01T23:59:59.000Z

384

Carbon Sequestration in Terrestrial Ecosystems: A Status Report on R&D Progress  

NLE Websites -- All DOE Office Websites (Extended Search)

Terrestrial Ecosystems: Terrestrial Ecosystems: A Status Report on R&D Progress Gary K. Jacobs (jacobsgk@ornl.gov, 865-576-0567) Oak Ridge National Laboratory PO Box 2008, MS-6035 Oak Ridge, TN 37831 Roger C. Dahlman (roger.dahlman@science.doe.gov, 301-903-4951) Office of Science/Biological and Environmental Research U. S. Department of Energy 19901 Germantown Road Germantown, MD 20874-1290 F. Blaine Metting, Jr. (blaine.metting@pnl.gov, 509-375-2607) Pacific Northwest National Laboratory 902 Battelle Blvd. PO Box 999, P7-54 Richland, WA 99352 Introduction Sequestration of carbon in terrestrial ecosystems is a low-cost option that may be available in the near-term to mitigate increasing atmospheric CO 2 concentrations, while providing additional benefits. Storing carbon in terrestrial ecosystems can be achieved through maintenance of

385

U.S. Department of Commerce National Oceanic and Atmospheric Administration  

E-Print Network (OSTI)

: Tagging, Release, Recover, and Assessment ­ full lifecycle. * considerations utilities, Feds, States, Tribes, Counties?) ­ Varies by species and program · Technology (includes lifecycle@dfw.wa.gov 509.493.2976 Ron Costello BPA rjcostello@bpa.gov 503.230.4367 Pete Hassemer IDFG pete.hassemer@idfg.idaho

386

RETURN TO THE RIVER -2000 Chapter 11 Monitoring and Evaluation412  

E-Print Network (OSTI)

: Tagging, Release, Recover, and Assessment ­ full lifecycle. * considerations utilities, Feds, States, Tribes, Counties?) ­ Varies by species and program · Technology (includes lifecycle@dfw.wa.gov 509.493.2976 Ron Costello BPA rjcostello@bpa.gov 503.230.4367 Pete Hassemer IDFG pete.hassemer@idfg.idaho

387

Council Document Number: 2007-05 The Northwest Power and  

E-Print Network (OSTI)

: Tagging, Release, Recover, and Assessment ­ full lifecycle. * considerations utilities, Feds, States, Tribes, Counties?) ­ Varies by species and program · Technology (includes lifecycle@dfw.wa.gov 509.493.2976 Ron Costello BPA rjcostello@bpa.gov 503.230.4367 Pete Hassemer IDFG pete.hassemer@idfg.idaho

388

Microsoft Word - Bell-BoundaryFiber_CX_2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amanda Williams Amanda Williams Project Manager - TEP-TPP-3 Proposed Action: Bell-Boundary Fiber Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 - Fiber optic cable Location: Spokane and Pend Orielle counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to install new fiber optic line along 90 miles of existing BPA transmission lines in Spokane and Pend Orielle counties in Washington (see Figure 1). It would extend from Bell Substation in Spokane, WA to Boundary Substation 8 miles north of Metaline Falls, WA. The fiber would be strung on the Bell-Boundary No. 1 transmission line and run through Sacheen and Cusick substations along the route. BPA would install overhead fiber optic cable on existing towers or on fiber optic wood poles where

389

Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum John Brank Project Manager - TPC-OL Proposed Action: Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-kilovolt (kV) line/convert microwave signals from analog to digital Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: The BPA Chehalis-Covington project would take place at the Chehalis Substation, in Lewis County, WA, at the Covington Substation, in King County, WA and at Tacoma Power's (TPWR) South Tacoma Substation in Pierce County, WA. Proposed by: BPA Description of the Proposed Action: The BPA and TPWR have developed a joint plan to convert the microwave transfer trip signals

390

3-4-10_Final_Testimony_(BPA)_(Wright).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT OF STATEMENT OF STEPHEN J. WRIGHT ADMINISTRATOR BONNEVILLE POWER ADMINISTRATION U. S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U. S. HOUSE OF REPRESENTATIVES MARCH 4, 2010 1 Madam Chairman and Members of the Subcommittee, I appreciate the opportunity to testify here today. My name is Steve Wright; I am the Administrator of the Bonneville Power Administration (Bonneville). I am pleased to be here today to discuss the President's Fiscal Year (FY) 2011 Budget as it relates to Bonneville. In my testimony today, I will share with the Committee Bonneville's significant successes over the past year, how we are addressing the considerable challenges we are facing, and an overview of the FY 2011 budget.

391

3-15-11_Final_Testimony_(Wright)_(BPA).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STEPHEN J. WRIGHT STEPHEN J. WRIGHT ADMINISTRATOR BONNEVILLE POWER ADMINISTRATION U.S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U.S. HOUSE OF REPRESENTATIVES MARCH 15, 2011 EXAMINING THE SPENDING, PRIORITIES AND THE MISSIONS OF THE BONNEVILLE POWER ADMINISTRATION, THE WESTERN AREA POWER ADMINISTRATION, THE SOUTHWESTERN POWER ADMINISTRATION AND THE SOUTHEASTERN POWER ADMINISTRATION Mr. Chairman and Members of the Subcommittee, I appreciate the opportunity to testify here today. My name is Steve Wright. I am the Administrator of the Bonneville Power Administration (Bonneville). I am pleased to be here today to discuss the President's Fiscal Year (FY) 2012 Budget as it relates to Bonneville. In my testimony today, I will share with the Committee Bonneville's significant

392

Microsoft Word - 4.16.13 Final BPA Testimony  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WILLIAM K. DRUMMOND WILLIAM K. DRUMMOND ADMINISTRATOR BONNEVILLE POWER ADMINISTRATION U.S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U.S. HOUSE OF REPRESENTATIVES APRIL 16, 2013 EXAMINING THE PROPOSED FISCAL YEAR 2014 SPENDING, PRIORITIES AND THE MISSIONS OF THE BUREAU OF RECLAMATION, THE FOUR POWER MARKETING ADMINISTRATIONS AND THE U.S. GEOLOGICAL SURVEY'S WATER PROGRAM Mr. Chairman and Members of the Subcommittee, I appreciate the opportunity to testify here today. My name is Bill Drummond. I am the Administrator of the Bonneville Power Administration (Bonneville) and welcome the opportunity to serve in this capacity. Before continuing with my remarks, I would like to first acknowledge the extraordinary public service

393

3-4-10_Final_Testimony_(BPA)_(Wright).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

over the next few years. It is thrilling to lead the Nation on this important topic of wind integration. But it is also a little unnerving because, as the largest transmission...

394

3-15-11_Final_Testimony_(Wright)_(BPA).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

which include tiered rates. Bonneville is proposing an 8.5 percent wholesale power rate increase primarily driven by the need for investment in the non-CO2 emitting, low...

395

TEPS/BPA Information | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

with a focus on small businesses. Special Features include: Eight small business-led teams; Each CTA member possesses their own contract ID so that users will have privity...

396

12-10-09_Final_Testimony_(Mainzer)_(BPA).pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

into the Western transmission system and the role storage technologies could play as one tool in the suite of initiatives we are developing to improve our ability to integrate...

397

BPA curtails wind power generators during high hydropower ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration - EIA ... The hydro capacity in the Pacific Northwest generates large amounts of electricity when river flows are high, ...

398

PRO-WA MTM Window Controller  

E-Print Network (OSTI)

...........................47 BRINGUP Tickler File and Appointment Book .....................51 Table of Contents - iii - Table

Mann, Tim

399

Highlight about Davis's WaPo recognition  

Science Conference Proceedings (OSTI)

... While solid-state lighting promises to reduce the Nation's consumption of energy for lighting by half, there are barriers to implementation. ...

2011-04-06T23:59:59.000Z

400

Sumas, WA Natural Gas Exports to Canada  

Gasoline and Diesel Fuel Update (EIA)

254,086 300,453 309,516 332,358 313,922 312,236 1996-2012 Pipeline Prices 6.61 8.19 3.99 4.22 3.96 2.72 1996...

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - Peninsula_Light_Co_L0308_Mod_CX_and_EnvCkLt.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel, Project Manager, TEP-TPP-1 Proposed Action: Peninsula Light Company Line and Load Interconnection Request L0308 (amendment to previous Categorical Exclusion issued on May 5, 2011) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.12 Construction of powerlines Location: Mason County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes a modification to a tap line that would interconnect Peninsula Light Company (PLC) into BPA's Shelton-Kitsap #2 115-kV transmission line in Mason County, WA. The original proposal involved constructing the tap within existing BPA right-of-way (ROW), as described in the categorical exclusion issued

402

(DOE/EIS-0285/SA-10): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) 0) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Duwamish No. 1 ROW from the Covington Substation to tower 10/4. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to

403

RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI...  

NLE Websites -- All DOE Office Websites (Extended Search)

modifying and implementing hardware and software that integrate the storage solution with solar panels that allow power generated by solar PV systems to be directed to and utilized...

404

RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk...  

NLE Websites -- All DOE Office Websites (Extended Search)

digester would be routed to the combined heat and power (CHP) unit consisting of a biogas-fired reciprocating engine and generator capable of producing 425 kW of electrical...

405

NATURAL GAS ADVISORY COMMITTEE 2013-2015 Name Affiliation Phone E-mail Sector  

E-Print Network (OSTI)

NATURAL GAS ADVISORY COMMITTEE 2013-2015 Name Affiliation Phone E-mail Sector Cocks, Michael BPA Natural Gas (503) 721-2475 randy.friedman@nwnatural.com Distribution Finklea Edward NW Ind. Gas Users (503@ci.tacoma.wa.us Electric Utility Defenbach, Byron Intermountain Gas (208) 377-6080 bdefen@intgas.com Distribution Dahlberg

406

EIS-0197: Record of Decision (November 1996) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: Record of Decision (November 1996) 97: Record of Decision (November 1996) EIS-0197: Record of Decision (November 1996) Delivery of the Canadian Entitlement The United States Entity (the Administrator of the Bonneville Power Administration [BPA] and the Division Engineer, North Pacific Division of the US Army Corps of Engineers [Corps]) has decided to fulfill its obligation under the Columbia River Treaty (Treaty) between the United States of America (United States) and Canada by delivering Canada's Entitlement under the Treaty to points on the border between Canada and the United States near Blaine, Washington and Nelway, British Columbia (BC). Delivering the full Entitlement at existing interconnections at those locations will require no new transmission facilities in the United States

407

Delivery of the Canadian Entitlement Final Environmental Impact Statement Record of Decision Summary; 08Nov1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Of Energy, Bonneville Power Administration Of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Delivery of the Canadian Entitlement Final Environmental Impact Statement Record of Decision Summary The United States Entity (the Administrator of the Bonneville Power Administration [BPA] and the Division Engineer, North Pacific Division of the US Army Corps of Engineers [Corps]) has decided to fulfill its obligation under the Columbia River Treaty (Treaty) between the United States of America (United States) and Canada by delivering Canada's Entitlement under the Treaty to points on the border between Canada and the United States near Blaine, Washington and Nelway, British Columbia (BC). Delivering the full Entitlement at existing interconnections at those locations will require no new transmission facilities in the

408

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

409

Microsoft Word - CX_Memo_Fairmount.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Fairmount Substation Equipment Acquisition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers. Location: Jefferson County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to a request by Jefferson County Public Utility District No.1 (Jefferson PUD), BPA is proposing to take ownership of equipment owned by Jefferson PUD within BPA's existing Fairmount Substation in Jefferson County, WA. Jefferson PUD, a Network Integration Customer of BPA, would sell its 115-kilovolt (kV) line terminal in Bay

410

(DOE/EIS-0285/SA-12): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Olympia-Grand Coulee No.1 Transmission Line ROW. Location: The ROW is located in Pierce and King Counties, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the

411

Microsoft Word - CX-Bell-Boundary_Well_FY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-AMPN-2 SUBJECT: Environmental Clearance Memorandum Mari Rosales Realty Specialist - TERR-Bell-1 Proposed Action: Decommission ground water monitoring well located on Bonneville Power Administration (BPA) fee-owned property. PP&A Project No.: 2163 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B3.1 Site characterization and environmental monitoring Location: Section 27; Township 40N; Range 43E; WM; Pend Oreille, WA Proposed by: BPA Description of the Proposed Action: BPA proposes to allow Seattle City Light access to a BPA fee-owned right-of-way (ROW) for the purpose of decommissioning a Seattle City Light- owned well. Seattle City Light historically installed ground water monitoring wells as part of

412

Microsoft Word - CX_Memo_Lex-Del  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

413

Microsoft Word - Alcoa_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Miller Mark Miller Account Executive, Long-term Sales and Purchases - PTL-5 Proposed Action: Alcoa Power Sales Contract Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.1 Contracts, policies, and marketing and allocation plans for electric power Location: Portland, OR and Ferndale, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to enter into a new power sales contract with Alcoa that would allow BPA to continue to provide service for Alcoa's Intalco Works, an existing aluminum smelter in Ferndale, Washington. Under an existing contract with Alcoa, BPA provided 320 average megawatts (aMW) of firm power to Alcoa from December 22, 2009 until October 1, 2012, and is currently providing 300 aMW through December 31, 2012.

414

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

415

Microsoft Word - ATT I205 Burton Road CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Tim Murray Project Manager - TELP-TPP-3 Proposed Action: AT&T Fiber Addition North Bonneville-Ross No. 2 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Fiber optic cable Location: Vancouver, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to allow AT&T to install an additional fiber optic line and vault within BPA's North Bonneville-Ross right-of-way easement and into an existing wireless communication facility. BPA has a commercial lease agreement with AT&T for co-location on its facilities and AT&T must request permission to update those facilities when they

416

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

417

Geothermal investigations in Idaho. Part 7. Geochemistry and geologic setting of the thermal waters of the Camas Prairie area, Blaine and Camas Counties, Idaho  

DOE Green Energy (OSTI)

The thermal waters of the east-west trending intermontane basin making up the Camas Prairie area were sampled during the fall of 1973. Average ground water temperature is 15/sup 0/C (10/sup 0/C above mean annual temperature). The thermal waters, chemically similar to thermal waters discharging from granitic rocks elsewhere in Idaho, have high pH, high Na/K and Na/Ca ratios, and high fluoride content. They are low in total dissolved solids (less than 365 mg/l), low in chloride, and exhibit relatively constant chloride/fluoride ratios and silica concentrations. Geochemical thermometers are interpreted to indicate that maximum aquifer temperatures in the Camas Prairie Basin are only about 100/sup 0/C, although higher temperatures were predicted by the quartz equilibrium geochemical thermometer and mixing models. The Magic Hot Springs well, located near the north shore of the Magic Reservoir at Hot Springs Landing, is an exception to these general conclusions. These waters may be circulating to depths approaching 1,800 to 2,500 m along faults or fissures; or may be due to leakage from an aquifer or reservoir heated by a shallow heat source, related perhaps to the Holocene basalt flows south of Magic Reservoir. These waters are nearly neutral in pH, are much higher in dissolved solids, exhibit higher chloride/fluoride, chloride/carbonate plus bicarbonate, and chloride/sulfate ratios, and are, in general, chemically dissimilar to thermal waters elsewhere in the area. Temperatures predicted by geochemical thermometers are thought to indicate that Magic Hot Springs well waters are ascending from an aquifer or reservoir with temperatures from 140/sup 0/ to 200/sup 0/C. Temperatures in this range would be sufficient for application in many industrial processes, including power generation, should sufficient water be available.

Mitchell, J.C.

1976-09-01T23:59:59.000Z

418

The Smithsonian Institution Libraries in 1999Fiscal Year October 1, 1998-September 30, 1999  

E-Print Network (OSTI)

. Banks Howard Barnes Frederick M. Bayer John H. Beaman Silvio A. Bedini Alan M. Berkun Susan F. Blaine

Mathis, Wayne N.

419

Advance Patent Waiver W(A)2009-002  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by JOHNSON MATTNEY FUEL CELLS INC. for a DOE waiver of domestic and foreign patent rights under agreement DE-FG36-07GO17019

420

Advance Patent Waiver W(A)2008-018  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by 3M COMPANY for a DOE waiver of domestic and foreign patent rights under agreement DE-FC36-07GO17006

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Title: Advance Patent Waiver W(A)2011-041  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by GENERAL MOTOR for a DOE waiver of domestic and foreign patent rights under agreement DE-AC36-08GO28308.

422

W(A)93-039 STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

monolith support and concludes with design, construction and operation of a 100 square-foot membrane area in a mobile prototype test facility on an actual waste stream. The...

423

Advance Patent Waiver W(A)2011-039  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by 3M COMPANY for a DOE waiver of domestic and foreign patent rights under agreement DE-FG36-08GO18134.

424

Advance Patent Waiver W(A)2012-027  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by DAIMIER TRUCKS NORTH AMERICA for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-EE0003348.

425

Isotopic Studies of Contaminant Transport at the Hanford Site, WA  

E-Print Network (OSTI)

Secretary of the Office of Environmental Management,Office of Science and Technology, under the Environmental Management

Christensen, J.N.; Conrad, M.E.; DePaolo, D.J.; Dresel, P.E.

2008-01-01T23:59:59.000Z

426

carleton university ottaWa, canaDa  

E-Print Network (OSTI)

of Carleton's greatest assets is its location in Ottawa, the nation's capital. A cosmopolitan city of close

427

EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA  

Energy.gov (U.S. Department of Energy (DOE))

DOE announces its intent to prepare an EIS for the Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, Washington (Natural Gas Pipeline or NGP EIS), and initiate a 30-day public scoping period.

428

Advance Patent Waiver W(A)2012-009  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by AE SOLAR for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-EE0005340.

429

Advance Patent Waiver W(A)2008-022  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ABENGOA BIOENERGY BIOMASS OF KANSAS, LLC for a DOE waiver of domestic and foreign patent rights under agreement DE-FC3607017028

430

Advance Patent Waiver W(A)2012-024  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by SIEMENS ENERGY, INC. for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-EE0005493.

431

Advance Patent Waiver W(A)2012-015  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by GENERAL ELECTRIC GLOBAL REARCH for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-FE0005859.

432

Advance Patent Waiver W(A)2012-011  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by RAYMOND TINNERMAN MANUFACTURING INC. for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-EE0005438.

433

Advance Patent Waiver W(A)2012-003  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by CREE for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-FOA-0000439.

434

Advance Patent Waiver W(A)2012-034  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by CORNING INCORPORATED for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-EE0005757.

435

Advance Patent Waiver W(A)2011-065  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by OWENS CORNING for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0005338.

436

Advance Patent Waiver W(A)2010-003  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by GENERAL ELECTRICC GLOBAL RESEARCH for a DOE waiver of domestic and foreign patent rights under agreement DE-FE0000784

437

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA  

Energy.gov (U.S. Department of Energy (DOE))

This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency.

438

Anemometer Data (Wind Speed, Direction) for Quinault #3, WA ...  

Open Energy Info (EERE)

Powering America, a DOE Office of Energy Efficiency & Renewable Energy (EERE) program. A dynamic map displaying all available data from DOE anemometer loan programs...

439

Advance Patent Waiver W(A)2008-025  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by Grace Davison Company for a DOE waiver of domestic and foreign patent rights under agreement DE-FC36-05GO085006

440

Advance Patent Waiver W(A)2011-020  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by CUMMINS, INC. for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0003403.

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Advance Patent Waiver W(A)2010-020  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by HALOTECHNICS, INC. for a DOE waiver of domestic and foreign patent rights under agreement DE-FC36-08GO18144

442

Advance Patent Waiver W(A)2010-037  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ALCATEL-LUCENT USA INC. for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0002895

443

Advance Patent Waiver W(A)2008-004  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by HUNTSMAN ADVANCED MATERIALS AMERICANS, INC. for a DOE waiver of domestic and foreign patent rights under agreement DE-FG36-07GO17012

444

Advance Patent Waiver W(A)2011-059  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by CARLISLE CONSTRUCTION MATERIALS, INC. for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0005435.

445

Advance Patent Waiver W(A)2010-062  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by PARKER HANNIFIN CORPORATION for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0000296

446

Advance Patent Waiver W(A)2009-064  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ROLLS ROYCE FUEL SYSTEMS for a DOE waiver of domestic and foreign patent rights under agreement DE-FE0000303

447

Advance Patent Waiver W(A)2010-054  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by UNITED TECHNOLOGIE for a DOE waiver of domestic and foreign patent rights under agreement DE-NT003894

448

Advance Patent Waiver W(A)2009-061  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by PPG INDUSTRIES for a DOE waiver of domestic and foreign patent rights under agreement DE-NT0003894

449

Advance Patent Waiver W(A)2011-037  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by DELPHI AUTOMOTIVE SYSTEMS, LLC for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0000478.

450

Advance Patent Waiver W(A)2011-018  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ESOLAR for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0003595.

451

Advance Patent Waiver W(A)2012-008  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ROBERT BOSCH, LLC for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-EE0003533.

452

Advance Patent Waiver W(A)2010-048  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ROBERT BOSCH, LLC for a DOE waiver of domestic and foreign patent rights under agreement DE-FC26-07NT43274

453

Advance Patent Waiver W(A)2012-025  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by EATON CORPORATION for a DOE Advance patent waiver of domestic and foreign patent rights under agreement DE-OE0000592.

454

W(A)93-013 STATEMENT OF CONSIDERATIONS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

microorganisms immobilization, the use of immobilized enzymes involved in the corn wet milling processes, and immobilized cells in bioreactors for organic waste degradation....

455

Isotopic Studies of Contaminant Transport at the Hanford Site, WA  

E-Print Network (OSTI)

Setting, Sources and Methods. PNNL-13080. Pacific NorthwestReport for Fiscal Year 2005. PNNL-15670. Pacific Northwestand composite samples. PNNL-13757-1. Pacific Northwest

Christensen, J.N.; Conrad, M.E.; DePaolo, D.J.; Dresel, P.E.

2008-01-01T23:59:59.000Z

456

Advance Patent Waiver W(A)2009-011  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by BOEING COMPANY for a DOE waiver of domestic and foreign patent rights under agreement DE-FG36-08GO18135

457

Advance Patent Waiver W(A)2010-018  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by BOEING COMPANY for a DOE waiver of domestic and foreign patent rights under agreement DE-FG36-08GO18055

458

Advance Patent Waiver W(A)2011-031  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by PARKER HANNIFIN CORPORATION for a DOE waiver of domestic and foreign patent rights under agreement DE-FE0005508.

459

Issaquah Highlands Zero Energy Affordable Housing (WA) - YWCA  

Science Conference Proceedings (OSTI)

The YWCA Family Village at Issaquah, Net Zero Energy Approach Project provides a compelling model for how the nation can seriously respond to the critical need for affordable housing while advancing environmental standards and reducing economic inequities. Affordable housing developments for vulnerable members of the community and in today's workforce cannot overlook issues, such as climate impact, energy security and water conservation. This project's advanced building design was based on the goal of creating a 100 year building that could achieve net zero energy usage if funding had been available to support the final pieces of energy generation. The team worked closely with community stakeholders to ensure the baseline components of high quality and efficient building envelopes along with efficient systems were in place to set the stage for future incorporation of energy generating systems such as solar panels. As built, these 146 homes, large child care center and community services areas are proving the value of investing upfront for the benefit of future generations by reducing ongoing utility and maintenance costs with an eye toward environmental stewardship and community/resident education. The DOE award helped fund two critical energy conservation features for the YWCA Family Village at Issaquah campus: 1) super-insulated roof assembly with a continuous air barrier and 2) domestic hot water preheat system. The roof system at the YWCA Family Village at Issaquah project was built to include 6" of Polyiso rigid insulation (R-38) on top of the roof sheathing to provide a super-insulated roof in line with the other green features of the project. Placing the rigid insulation on top of the roof sheathing allows the building to have a continuous layer of insulation and provides a continuous air barrier. The domestic hot water preheat system includes flat panel arrays on roofs of the buildings that heat the water using solar power, which reduces the amount of heating needed from the gas-fired boilers. The flat-plate panels on the roof of the building heats the water using solar power. A heat exchanger transfers heat from water warmed by the panels to potable water for the units. The warmed potable water mixes with the tap water supply to create hot water for the buildings. This boost of water warmed by the solar panels reduces the heating costs for eh project by reducing the need to heat the water via gas-fired boilers. Both of these energy upgrades were chosen because they significantly improve the energy efficiency for the life of the building and are reducing monthly utility costs for both the residents and the owners. Since the owner is a not-for-profit dedicated to long-term ownership and serving households with very-low and low-incomes, the costs savings will ultimately benefit current and future residents as the dollars saved will either be realized directly by the resident or be invested in the project. Technically, the design of these systems is easily understood and the principles could be applied to other projects. The incremental costs depend largely on the existing market rate of the components-none of which are considered "cutting edge" so a market does currently exist.

Tom, Vincent; DeRobbio, Wendy; Hall, Linda

2012-04-30T23:59:59.000Z

460

[Interview]: Alexandre Shvartsburg, Pacific Northwest National Laboratory, Richland, WA, USA  

SciTech Connect

Q1. What are your main research activities in ion mobility mass spectrometry (past or present)? My early efforts focused on the structural characterization of atomic (carbon and semiconductor) clusters. After the production of bulk fullerenes, many hoped that other nanoclusters discovered in the gas phase could also coalesce into new materials. As these studies required accurate and robust mobility calculations for any ion geometry, I strived to build the needed theory and implement it in the Mobcal software widely employed today. Since 2004, I have been developing methods and novel applications of differential IMS (FAIMS) at PNNL. The principal achievement has been raising the resolving power by over tenfold (up to ~400 for multiply-charged peptides) using elevated fields, helium and hydrogen-rich buffers, and extended filtering times. This performance broadly allows previously unthinkable separations of very similar species, for example sequence inversions and post-translational modification localization isomers of peptides (including middle-down peptides such as histone tails), lipid regioisomers, and even isotopomers. Another major direction is investigating the dipole alignment of larger proteins, which creates an exceptionally strong FAIMS effect that is a potential tool for structural biology. Q2: What have been the most significant instrumentation or applications developments in the history of ion mobility - mass spectrometry? In 1995 when I started graduate research at Northwestern, only two groups worldwide worked with IMS/MS and the literature meant papers by Bowers (UCSB). Well-wishers counseled me to learn something useful like HPLC, as IMS would never have real utility. This booklet showcases the scale of change since. First, the practical IMS/ToF platforms for complex biological analyses demonstrated by Clemmer have turned IMS/MS from an esoteric physical chemistry technique into a powerful analytical tool. By commercializing the IMS/ToF technology in Synapt instruments, Waters has greatly increased its impact via expanded number and diversity of applications. Concurrently, Guevremont at Canadian NRC has perfected FAIMS coupled to MS, deployed it for real-world bio and environmental analyses, and widely distributed it in the Ionalytics Selectra system (subsequently installed on Thermo MS platforms). The latest breakthrough is ultra-FAIMS by Owlstone, where extreme fields allow numerous qualitatively new separations and operational modes that we just begin to explore. Q3: Where do you see ion mobility - mass spectrometry making the most impact in the next 5 years? Any predictions for where the field will go? Sciences dealing with perturbations in media (such as optics or acoustics) at some point shift from the linear to nonlinear paradigm, where propagation depends on the magnitude of perturbation or its driving force. While the linear part remains industrially important (e.g., eyewear and architectural glass for optics), frontline research moves to nonlinear phenomena. IMS is undergoing that transition now with the rise of FAIMS, which should continue as the fundamental understanding improves, new modalities and applications emerge, and more instrumentation is introduced by vendors. Modifying and augmenting FAIMS separations through vapor dopants that render ion mobilities less linear is becoming routine. I expect this area to advance, extending to more specific interactions and to complexation with solution additives. Another route to higher separation power is integrating FAIMS with conventional IMS; proliferation of both technologies would make such 2-D platforms common. Along with mass spectrometry and conventional IMS, FAIMS will address increasingly large macromolecules, including proteins and their complexes.

Shvartsburg, Alexandre A.

2012-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Advance Patent Waiver W(A)2011-048  

Energy.gov (U.S. Department of Energy (DOE))

This is a request by ADA-ES for a DOE waiver of domestic and foreign patent rights under agreement DE-FE0004343.

462

Sumas, WA Natural Gas Pipeline Exports to Canada (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2011 879 2,890 1,051 756 356 296 30 3 15 189 1,194 2,110 2012 2,140 1,464 436 76 7 54 42 4 303 495 996 2013 3,893 1,051 1,566...

463

Sumas, WA Natural Gas Pipeline Exports to Canada (Dollars per...  

Annual Energy Outlook 2012 (EIA)

Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2011 4.32 4.62 4.61 4.49 4.38 4.83 5.16 3.89 3.86 5.95 4.50 4.05 2012 4.09 3.35 4.87 5.20 2.25 4.65 2.86 4.45 3.57 4.20 3.57...

464

Sumas, WA Natural Gas Pipeline Imports From Canada (Dollars per ...  

U.S. Energy Information Administration (EIA)

Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec; 2011: 4.22: 4.10: 3.86: 4.07: 4.07: 4.33: 4.12: 3.97: 3.83: 3.64: 3.66: 3.75: 2012: 3.14: 2.66: 2.32: 1.93: 2.08 ...

465

Sumas, WA Natural Gas Pipeline Exports to Canada (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 1,451 208 NA 2000's NA 1,529 1,477 33 15 1,304 2,529 6,560 10,603 12,530 2010's 7,769 9,768...

466

Sumas, WA Natural Gas Pipeline Imports From Canada (Dollars per...  

Gasoline and Diesel Fuel Update (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 1.43 1.69 1.71 2.17 2000's 4.28 4.76 3.01 4.76 5.31 7.11 6.21 6.61 8.19 3.99 2010's 4.22 3.96...

467

Sumas, WA Natural Gas Pipeline Imports From Canada (Million Cubic...  

U.S. Energy Information Administration (EIA) Indexed Site

Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2011 26,022 22,492 28,014 23,553 25,587 24,980 27,852 24,780 27,293 27,092 26,911 29,345 2012 28,563 24,961 23,685 21,957...

468

Sumas, WA Natural Gas Pipeline Imports From Canada (Dollars per...  

Gasoline and Diesel Fuel Update (EIA)

Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2011 4.22 4.10 3.86 4.07 4.07 4.33 4.12 3.97 3.83 3.64 3.66 3.75 2012 3.14 2.66 2.32 1.93 2.08 2.28 2.53 2.69 2.56 3.14 3.79...

469

Sumas, WA Natural Gas Pipeline Imports From Canada (Million Cubic...  

Annual Energy Outlook 2012 (EIA)

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 356,711 360,261 374,666 415,636 2000's 347,992 366,050 394,929 366,257 339,051 336,684 255,743...

470

Sumas, WA Natural Gas Pipeline Exports to Canada (Dollars per...  

U.S. Energy Information Administration (EIA) Indexed Site

Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 2.81 2.80 NA 2000's NA 4.44 2.59 4.27 4.16 8.01 6.58 6.14 7.99 5.55 2010's 4.81 4.47 3.87 - No...

471

"Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status of Ongoing NEPA Compliance Activities - Environmental Impact Statements" "Bonneville Power Administration Annual NEPA Planning Summary Status of Ongoing NEPA Compliance Activities Environmental Impact Statements" "application/vnd.ms-excel" "#","*Title, Location","Estimated Cost","Estimated Schedule (**NEPA Milestones)",,"Description" ,"I-5 Corridor Reinforcement Project Cowlitz and Clark Counties, WA and Multnomah County, OR",5000000,"Determination Date:","application/vnd.ms-excel"," Construct about 70 miles of new 500-kV line between a new proposed substation near Castle Rock, WA and an exsting BPA substation in Troutdale, OR"

472

Microsoft Word - CX-BadgerCanyon-RichlandNo1_WoodPoles_FY13.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2013 7, 2013 REPLY TO ATTN OF: KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Walker Miller Electrical Engineer - TPCF-W RICHLAND Proposed Action: Wood pole replacements on the Badger Canyon-Richland #1 transmission line PP&A Project No.: 2670 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities. Location: City of Richland, Benton County, WA Transmission Line/ROW Structure # Township Range Section County, State Badger Canyon-Richland #1 4/9 and 4/10 9N 28E 26 Benton, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA, at the expense of the City of Richland, proposes to raise structures 4/9 and 4/10 of the Badger Canyon-Richland #1 115-kilovolt transmission line to

473

Microsoft Word - PTPC_extension_amendment_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Miller Mark Miller Account Executive, Long-term Sales and Purchases - PTL-5 Proposed Action: Amendment Number 2 to the Port Townsend Paper Corporation Power Sales Agreement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A2 - Clarifying or administrative contract actions Location: Portland, OR and Port Townsend, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to amend the 2011 Firm Power Sales Agreement with Port Townsend Paper Corporation to exend the original duration through September 30, 2022. Findings: Amending the Agreement with Port Townsend Paper Corporation would involve extending service under an existing power sales contract to a facility (in Port Townsend, WA)

474

EA-1912: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Finding of No Significant Impact 2: Finding of No Significant Impact EA-1912: Finding of No Significant Impact Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Based on the information in the EA, as summarized here, BPA and DOE-RL determines that the Proposed Action is not a major federal action significantly affecting the quality of the human environment within the meaning of NEPA (42 United States Code 4321 et seq.). Therefore, an EIS will not be prepared and BPA and DOE-RL are issuing this FONSI for the Proposed Action. EA-1912-FONSI-2012.pdf More Documents & Publications EA-1912: Draft Environmental Assessment EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA 2012 Annual Planning Summary for Bonneville Power Administration

475

Microsoft Word - Alcoa_extension_No2_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 22, 2012 June 22, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Mark Miller Account Executive, Long-Term Sales and Purchases - PT-5 Proposed Action: Amendment Number 2 to the Alcoa Power Sales Agreement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): A2 - Clarifying or administrative contract actions Location: Portland, OR and Ferndale, WA Proposed by: Bonneville Power Administration (BPA)

476

Microsoft Word - BPA_Creston_Bell_PrelimEA_04-06-12_Final[1].docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Creston-Bell Transmission Line Rebuild Project Preliminary Environmental Assessment April 2012 DOE/BP-4406 This page intentionally left blank. Bonneville Power Administration iii Table of Contents Chapter 1 Purpose of and Need for Action 1-1 1.1 Introduction ....................................................................................................... 1-1 1.2 Need for Action ................................................................................................. 1-1 1.3 Purposes of Action ............................................................................................ 1-3 1.4 Public Involvement ........................................................................................... 1-3 Chapter 2 Proposed Action and Alternatives 2-1

477

Algae Tile Data: 2004-2007, BPA-51; Preliminary Report, October 28, 2008.  

DOE Green Energy (OSTI)

Multiple files containing 2004 through 2007 Tile Chlorophyll data for the Kootenai River sites designated as: KR1, KR2, KR3, KR4 (Downriver) and KR6, KR7, KR9, KR9.1, KR10, KR11, KR12, KR13, KR14 (Upriver) were received by SCS. For a complete description of the sites covered, please refer to http://ktoi.scsnetw.com. To maintain consistency with the previous SCS algae reports, all analyses were carried out separately for the Upriver and Downriver categories, as defined in the aforementioned paragraph. The Upriver designation, however, now includes three additional sites, KR11, KR12, and the nutrient addition site, KR9.1. Summary statistics and information on the four responses, chlorophyll a, chlorophyll a Accrual Rate, Total Chlorophyll, and Total Chlorophyll Accrual Rate are presented in Print Out 2. Computations were carried out separately for each river position (Upriver and Downriver) and year. For example, the Downriver position in 2004 showed an average Chlorophyll a level of 25.5 mg with a standard deviation of 21.4 and minimum and maximum values of 3.1 and 196 mg, respectively. The Upriver data in 2004 showed a lower overall average chlorophyll a level at 2.23 mg with a lower standard deviation (3.6) and minimum and maximum values of (0.13 and 28.7, respectively). A more comprehensive summary of each variable and position is given in Print Out 3. This lists the information above as well as other summary information such as the variance, standard error, various percentiles and extreme values. Using the 2004 Downriver Chlorophyll a as an example again, the variance of this data was 459.3 and the standard error of the mean was 1.55. The median value or 50th percentile was 21.3, meaning 50% of the data fell above and below this value. It should be noted that this value is somewhat different than the mean of 25.5. This is an indication that the frequency distribution of the data is not symmetrical (skewed). The skewness statistic, listed as part of the first section of each analysis, quantifies this. In a symmetric distribution, such as a Normal distribution, the skewness value would be 0. The tile chlorophyll data, however, shows larger values. Chlorophyll a, in the 2004 Downriver example, has a skewness statistic of 3.54, which is quite high. In the last section of the summary analysis, the stem and leaf plot graphically demonstrates the asymmetry, showing most of the data centered around 25 with a large value at 196. The final plot is referred to as a normal probability plot and graphically compares the data to a theoretical normal distribution. For chlorophyll a, the data (asterisks) deviate substantially from the theoretical normal distribution (diagonal reference line of pluses), indicating that the data is non-normal. Other response variables in both the Downriver and Upriver categories also indicated skewed distributions. Because the sample size and mean comparison procedures below require symmetrical, normally distributed data, each response in the data set was logarithmically transformed. The logarithmic transformation, in this case, can help mitigate skewness problems. The summary statistics for the four transformed responses (log-ChlorA, log-TotChlor, and log-accrual ) are given in Print Out 4. For the 2004 Downriver Chlorophyll a data, the logarithmic transformation reduced the skewness value to -0.36 and produced a more bell-shaped symmetric frequency distribution. Similar improvements are shown for the remaining variables and river categories. Hence, all subsequent analyses given below are based on logarithmic transformations of the original responses.

Holderman, Charles

2009-02-10T23:59:59.000Z

478

Macroinvertebrate Abundance and Biomass: 2007 Data, BPA-51; Preliminary Report, February 10, 2009..  

DOE Green Energy (OSTI)

Four Excel files containing information on the 2007 macroinvertebrate data were initially provided to Statistical Consulting Services (SCS) by EcoAnalysts on 1/27/2009. These data files contained information on abundance and biomass data at the level of taxonomic groups. The data were subsequently reformatted and compiled, and aggregated for analysis by SCS. All descriptions and analyses below relate to this compiled data. Computations were carried out separately for each site over all sample periods. Basic summary information for both the abundance and biomass data is presented in Print Out No.2. The 14 sites varied widely in their minimum, mean, maximum and variance values. The number of observations ranged from 10 to 18. Some large abundance values (abundance > 40,000) were noted for sites KR6 and KR13. A more detailed summary of each site is given in Print Out No.3. Site KR3, for example, had a mean abundance of 6914 with a sample size of 17. The variance was 4591991 and the standard error of the mean was 1643. The skewness value, a measure of symmetry for the frequency distribution, was moderately large at 1.29 indicating an asymmetric distribution. Biomass for KR3 had a mean value of 0.87 g/m{sup 2} with 17 observations. The variance was 0.8872 and the standard error was 0.228 g/m{sup 2}. Skewness for biomass was also high at 1.29. Further examination of the quantiles and frequency plots for abundance and biomass also indicate considerable skewness. The stem and leaf diagram (frequency plot) for abundance in KR3 shows most of the data centered on smaller values with a few very large counts. The distribution for biomass has a similar pattern. Statistical tests for normality are significant for both response variables in KR3, thus, the hypothesis that the data originates from a symmetric normal distribution is rejected. Because sample size estimation and statistical inference assume normally distributed data, a transformation of the data is required prior to further analysis. As was the case for previous years, the natural logarithm was chosen as a transformation to mitigate distributional skewness. Abundance and biomass for the remaining sites were also notably skewed, therefore, these data were also log transformed prior to analysis. Summary information for the transformed data (referred to as L-abun and L-bio for abundance and biomass, respectively) are given in Print Out No.4. For site KR3, the logarithmic transformation reduced skewness value for biomass to -0.66. The distributions of abundance and biomass in the other sites also generally showed improvement as well. Hence, all subsequent statistical analyses reported here will be based on the log transformed data.

Holderman, Charles

2009-02-10T23:59:59.000Z

479

30-MJ superconducting magnetic energy storage for BPA transmission-line stabilizer  

DOE Green Energy (OSTI)

The Bonneville Power Administration operates the transmission system that joins the Pacific Northwest and southern California. A 30 MJ (8.4 kWh) superconducting Magnetic Energy Storage (SMES) unit with a 10 MW converter can provide system damping for low frequency oscillations. The unit is scheduled to operate in late 1982. Progress to date is described. The coil is complete. All major components of the electrical and cryogenic systems have been received and testing has begun. Computer control hardware is in place and software development is proceeding. Support system components and dewar lid are being fabricated and foundation design is complete. A contract for dewar fabrication is being negotiated.

Schermer, R.I.

1981-01-01T23:59:59.000Z

480

30-MJ superconducting magnetic-energy storage for BPA transmission-line stabilizer  

DOE Green Energy (OSTI)

The Bonneville Power Administration operates the transmission system that joins the Pacific Northwest and southern California. A 30 MJ (8.4 kWh) Superconducting Magnetic Energy Storage (SMES) unit with a 10 MW converter can provide system damping for low frequency oscillations. The unit is scheduled to operate in 1982. Progress during FY 81 is described. The coil is complete. All major components of the electrical and cryogenic systems have been received and testing has begun. Computer control hardware is in place and software development is proceeding. Support system components and dewar lid are being fabricated and foundation design is complete. A contract for dewar fabrication is being negotiated.

Schermer, R.I.

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bpa blaine wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Response to ISRP Comments for the StreamNet Project BPA Project # 198810804  

E-Print Network (OSTI)

allocation cycles in Southern California's RECLAIM Program in order to test the independence of permit to understand how the RECLAIM program was developed and implemented. This research was supported by the UC's RECLAIM trading program. More recent studies of the EU ETS show ...rms expressing a preference

482

Low Probability Tail Event Analysis and Mitigation in the BPA Control Area  

SciTech Connect

This report investigated the uncertainties with the operations of the power system and their contributions to tail events, especially under high penetration of wind. A Bayesian network model is established to quantify the impact of these uncertainties on system imbalance. The framework is presented for a decision support tool, which can help system operators better estimate the need for balancing reserves and prepare for tail events.

Lu, Shuai; Brothers, Alan J.; McKinstry, Craig A.; Jin, Shuangshuang; Makarov, Yuri V.

2010-10-31T23:59:59.000Z

483

Radiological Assessment for the Removal of Legacy BPA Power Lines that Cross the Hanford Site  

SciTech Connect

This paper discusses some radiological field monitoring and assessment methods used to assess the components of an old electrical power transmission line that ran across the Hanford Site between the production reactors area (100 Area) and the chemical processing area (200 Area). This task was complicated by the presence of radon daughters?both beta and alpha emitters?residing on the surfaces, particularly on the surfaces of weathered metals and metals that had been electrically-charged. In many cases, these activities were high compared to the DOE Surface Contamination Guidelines, which were used as guides for the assessment. These methods included the use of the Toulmin model of argument?represented using Toulmin diagrams-- to represent the combined force of several strands of evidences, rather than a single measurement of activity, to demonstrate beyond a reasonable doubt that no or very little Hanford activity was present and mixed with the natural activity. A number of forms of evidence were used: the overall chance of Hanford contamination; measurements of removable activity, beta and alpha; 1-minute scaler counts of total surface activity, beta and alpha, using ?background makers?; the beta activity to alpha activity ratios; measured contamination on nearby components; NaI gamma spectral measurements to compare uncontaminated and potentially-contaminated spectra, as well as measurements for the sentinel radionuclides, Am- 241 and Cs-137 on conducting wire; comparative statistical analyses; and in-situ measurements of alpha spectra on conducting wire showing that the alpha activity was natural Po-210, as well as to compare uncontaminated and potentially-contaminated spectra.

Millsap, William J.; Brush, Daniel J.

2013-11-13T23:59:59.000Z

484

Microsoft Word - BPA Comments on form EIA-930 _final_.docx  

Annual Energy Outlook 2012 (EIA)

- BONNEVILLE'S COMMENTS ON FORM EIA-930 BEFORE THE ENERGY INFORMATION ADMINISTRATION Agency Information Collection ) Proposed at Extension with Changes ) 78 Fed. Reg. 14521...

485

Microsoft Word - 9-22-11 Final Testimony _Delwiche_ _BPA Statement for the Record_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GREGORY K. DELWICHE GREGORY K. DELWICHE SENIOR VICE PRESIDENT OF POWER SERVICES BONNEVILLE POWER ADMINISTRATION BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U.S. HOUSE OF REPRESENTATIVES SEPTEMBER 22, 2011 Mr. Chairman and Members of the Committee, I appreciate the opportunity to offer this statement regarding H.R. 1719 which would, if enacted, direct the Administrators of the Federal Power Marketing Administrations (PMA) to include on customers' monthly bills information about the costs the PMAs are incurring to comply with the Endangered Species Act (ESA). This statement is similar to my testimony provided on March 16, 2006 (H.R. 4857). ESA compliance costs incurred by Bonneville Power Administration (Bonneville) include the power share of debt service and operations and maintenance expense for fish passage facilities at

486

Water Quality: 2007 Data, BPA-51; Preliminary Report, January 26, 2009.  

DOE Green Energy (OSTI)

Print Out No.1 presents a listing of the initial data. The variables included were: SITE, REP, NH4, NO2{_}3, SRP, TDP, TN, TP, and JULIAN , representing site code, replication number, ammonia nitrogen, nitrate and nitrite nitrogen, soluble reactive phosphorus, total dissolved phosphorus, total nitrogen, total phosphorus, and Julian date, respectively. All values for nitrogen, phosphorus, and carbon variables are recorded as {micro}g/L. The 2007 water quality data received by SCS required considerable manipulation and data management prior to analysis. If it is anticipated that water quality data received by SCS in the future will be of the same format, the time to carry out the necessary reformatting of the data should be taken into consideration. The levels of SRP from water quality data of previous years were often below detection limits. The data from 2007 showed elevated levels for this and other responses. This pattern was seemingly unrelated to nutrient addition treatments, however, as they appeared consistently across the study area. The river fertilization program was begun in 2005. Because the procedures for detection of nutrients and metals are quite sensitive, SCS recommends that any future water quality samples taken on, or close to, the dates of fertilizer application be carried out with the utmost care to avoid contamination issues. Doing so will ensure consistency and reliability in the resulting data.

Holderman, Charles

2009-02-10T23:59:59.000Z

487

Pacific Northwest Demand Response Project Lee Hall, BPA Smart Grid Program Manager  

E-Print Network (OSTI)

, and challenging. Bonneville has previously reported to the Council on their role in the regional Smart Grid to reported to the Council on their role in the regional Smart Grid ich includes demand response in 10 to the Council on their role in the regional Smart Grid ich includes demand response in 10 participating

488

Microsoft Word - 3-20-12 Final Testimony _Wright_ _BPA_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MR. STEPHEN J. WRIGHT MR. STEPHEN J. WRIGHT ADMINISTRATOR BONNEVILLE POWER ADMINISTRATION U.S. DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON WATER AND POWER COMMITTEE ON NATURAL RESOURCES U.S. HOUSE OF REPRESENTATIVES MARCH 20, 2012 EXAMINING THE PROPOSED FISCAL YEAR 2013 SPENDING, PRIORITIES AND THE MISSIONS OF THE BONNEVILLE POWER ADMINISTRATION, THE WESTERN AREA POWER ADMINISTRATION, THE SOUTHWESTERN POWER ADMINISTRATION AND THE SOUTHEASTERN POWER ADMINISTRATION Mr. Chairman and Members of the Subcommittee, I appreciate the opportunity to testify here today. My name is Steve Wright. I am the Administrator of the Bonneville Power Administration (Bonneville). I am pleased to be here today to discuss the President's Fiscal Year (FY) 2013 Budget as it relates to Bonneville.

489

Microsoft Word - NEPA_CX_WSDOT_LURR_No_20080504_SALE_North_Bonneville-Ross_ROW.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dawneen Dostert Dawneen Dostert Project Manager - TERR-LMT Proposed Action: Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Vancouver, Clark County, WA, Township 2 North, Range 2 East, Section 28 and 21, Willamette Meridian Proposed by: Bonneville Power Adminitstration (BPA) Description of the Proposed Action: In response to a Land Use Review Request (LURR 20080504), BPA proposes to sell in fee 2.3 acres of land, located in Clark County, Washington, to WSDOT. The land consists of two strips within a residential area, located on either side of

490

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

491

Microsoft Word - Peninsula_Light_Co_L0308_NEPA_CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 05, 2011 May 05, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Peninsula Light Company Line and Load Interconnection Request L0308 Budget Information: 00004866, Task 4 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and/or modifications to electric power transmission facilities within previously developed areas. Location: Mason County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Peninsula Light Company (PLC) submitted a request to BPA for an emergency 115-kV connection to BPA's Shelton-Kitsap #2 115-kV line in order to serve its load in the event of a double circuit loss at the Tacoma Narrows Crossing. In response

492

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

493

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

494

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

495

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

496

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

497

Microsoft Word - CX-SnoKingSubstationExpansionFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Michael Marleau Michael Marleau Project Manager - TEP-TPP-1 Proposed Action: Sno-King Substation Expansion Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.11 Electric power substations and interconnection facilities Location: Bothell, Snohomish County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand its Sno-King Substation's fenced electrical yard by approximately 0.2 acres to accommodate new equipment. The substation expansion is necessary to make room for the addition of a back-up 500/230-kV power transformer, which BPA can energize in the event of a primary transformer failure. The additional transformer will increase the safety and reliability of the system.

498

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

499

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

500

EIS-0214 - North Regional Power Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT FACT S~ET NEPA DOWENT This environment impact statement (EW) is issued under Section 102 (2) (C) of the National Environrnenti Poficy Act @EpA) at 42 U.S-C. 4321 Q a. s~ce ~anges to the Draft EE were rektively minor, BPA decided to pubtish the changes, comments, and responses as the Find EB rather than rewrite and cirtite the Draft EIS. NA~E AND LOCAHON OF H PROPOSAL '~ ALTERNAmS The original proponents and developers of the Northwest Regional Power Fa~ty were WA Resources, Inc. WA) and Central and South West Energy, hc. (CSWE). Recentiy the development agreement was amended to include ~T Power hc. The proponents have created a Limited Liabfity Company, WA Power LLC. WA Power LLC is composed of WA Resources he., and ~T Power hc. ~T Power kc., is a who~y-owned subsidiary of ~T kc., which is a who~y owned subsidiary of Wsas City Power and Light Company. References to WA and ~WE throughout this EIS