Powered by Deep Web Technologies
Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

PV integration in the Bonneville Power Administration balancing authority area.  

E-Print Network (OSTI)

??In this study I investigate the accuracy and necessity of the Bonneville Power Administration (BPA) PV integration tariff, which was instituted in 2011. Note that, (more)

Schumaker, Adam

2012-01-01T23:59:59.000Z

2

PP-36 Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE))

Presidential Permit authorizing Bonneville Power Administration to construct, operate, and maintain electric transmission facilities from U.S.- Canada Border.

3

PP-10 Bonneville Power Administrator  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

4

PP-46 Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE))

Presidential Permit authorizing Bonneville Power Administration to contruct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

5

Bonneville Power Administrator Compares  

E-Print Network (OSTI)

Bonneville Power Administrator Compares Missouri Basin Reservoirs with Pacific Northwest's by Pat-16 was the dinner speech of a former Nebraskan from Schuyler, James Jura. Now administrator of the Bonneville Power Administration, Portland, Ore., Jura has been with Bonneville for the past 10 ears. He spoke to the group

Nebraska-Lincoln, University of

6

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

agreement (Agreement) between the BC Hydro and Power uthority (BCH) and the Bonneville Power Administration (BP A), jointly the Parties, which BA for accounting purposes is...

7

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 and Conservation Council (Council) members have asked that Bonneville Power Administration (Bonneville) make its in the rating process. As you know, the Northwest Power Act obligates Bonneville to use its authorities to fund

8

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

o Includes option to elect into Shared Rate Plan, if room under limit Bonneville Power Administration 061708 Revision (Original version issued externally April 11, 2008)...

9

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

ENT OFFS Department of Energy Bonneville Power Administration P.O. Box 3621 ' 91 FS F P Portland, Oregon 97208-3621 PUBLIC AFFAIRS April 20, 2011 In reply refer to: DK-7...

10

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

- NT oc Department of Energy Bonneville Power Administration * r ' P.Q. Box 3621 Portland, Oregon 97208-3621 PUBLIC AFFAIRS September 30. 201 1 In reply refer to: DK-7 Richard...

11

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

is your final response to your request for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 U.S.C. 552. You...

12

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

http:www.bpa.gov PR 02 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Thursday, Jan. 23, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 BPA...

13

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

is a final response to your request for information that you made to the Bonneville Power Administration (BPA) under the Freedom of Information Act (FOIA), 5 USC 552. You...

14

PP-10-1 Bonneville Power Administrator  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

15

PIA - Bonneville Power Adminstration Ethics Helpline | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PIA - Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline Hosted and operated...

16

Bonneville Power Administration (BPA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

17

Bonneville Power Administration Administrator Steve Wright  

E-Print Network (OSTI)

Bonneville Power Administration Administrator Steve Wright PO Box 12999 Portland, OR 97208 Dear salmon, clean, renewable energy, and a healthy economy. The Bonneville Power Administration (BPA largely failed to meet their legal salmon recovery responsibilities. I urge the Bonneville Power

18

Reading File Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Reading File Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES In reply refer to: PG-5 Ms. Renata Kurschner Director, Generation Resource...

19

Bonneville Power Administration (WFP) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration (WFP) Bonneville Power Administration (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

20

Comments of the Bonneville Power Administration | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Bonneville Power Administration Comments of the Bonneville Power Administration BPA appreciates the opportunity to provide comments and information and submits the following...

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

exceptions include: traffic signals, exit signs, kitchen equipment, network power management, power strips, showerheads, clothes washers, water heaters and ag stock...

22

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2011 August 5, 2011 CX-006482: Categorical Exclusion Determination Swan Valley - Palisades Communication Upgrade CX(s) Applied: B1.7, B4.6 Date: 08/05/2011 Location(s): Idaho Office(s): Bonneville Power Administration August 5, 2011 CX-006481: Categorical Exclusion Determination Funding Removal of Underground Storage Tank at Nelson Springs CX(s) Applied: B6.1 Date: 08/05/2011 Location(s): Richland, Washington Office(s): Bonneville Power Administration August 3, 2011 CX-006483: Categorical Exclusion Determination Balancing Authority Area Service Agreement with Lane Electric Cooperative, Inc. CX(s) Applied: B4.1 Date: 08/03/2011 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration July 26, 2011 CX-006293: Categorical Exclusion Determination Provision of Funds to the Confederated Salish and Kootenai Tribes for

23

Land Record System PIA, Bonneville Power Administration | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record...

24

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Conservation Rate Credit (CRC) - A current funding mechanism that provides a discounted power rate to participating utilities, conditioned on documented expenditures on qualifying...

25

Northwest, the Bonneville Power  

NLE Websites -- All DOE Office Websites (Extended Search)

by a similar event. Overgrown trees came in contact with high-voltage transmission lines, causing a protective shutdown that created cascading power outages across the...

26

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Next Steps 5:00 Adjourn About the Post-2011 Review Process BPA invited its public power customers and regional stakeholders to participate in the Energy Efficiency Post-2011...

27

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

09 Nosh Makujina Boise 208.631.5961 nosh.makujina@energysmartindustrial.com Clearwater Power Co. 12109 Richard Jarvis Kalispell 406.257.3013 rich.jarvis@energysmartindustrial.co...

28

eGIS Portal PIA, Bonneville Power Administration | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power...

29

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration August 26, 2013 CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3

30

Bonneville Power Administration's Purchasing of Energy Savings  

E-Print Network (OSTI)

BONNEVILLE POWER ADMINISTRATION'S PURCHASE OF ENERGY SAVINGS Harold (Skip) Schick Leslie E. McMillan Bonneville Power Administration Port1and, Oregon INTRODUCTION The Bonneville Power Administration (BPA) is conducting a commercial... of several activities BPA is conductin9 to develop the capabil ity to conserve energy in the com mercial sector of electrical energy use. This paper describes the benefits of the approach, the program des ign, 1essons 1earned through field testing...

Schick, H.

31

Bonneville Power Administration Attachment P Oversupply Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Provider will displace all such Generators on a pro-rata basis. Bonneville Power Administration Attachment P Oversupply Management Protocol Open Access Transmission...

32

Independent Oversight Review, Bonneville Power Administration...  

Office of Environmental Management (EM)

and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. The review is one of several BPA initiatives to improve...

33

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208) Biological Opinion (BiOp). Bonneville Power Administration (BPA) supports the effort of developing a common-3621 ENVIRONMENT, FISH AND WILDLIFE May 18, 2009 In reply refer to: KEW-4 Ms. Nancy Leonard Northwest Power

34

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Columbia River Power System (FCRPS) has been recommended for funding. These projects provide Bonneville, Chairman Northwest Power Planning Council 851 SW Sixth Avenue, Suite 1100 Portland, OR 97204-1348 Dear

35

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 about the amount and nature of cost-sharing offered. As a result, Bonneville Power Administration, Chairman Northwest Power and Conservation Council 851 S.W. Sixth Ave., Suite 1100 Portland, OR 97204

36

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 to Independent Scientific Review Panel (ISRP) review, Bonneville Power Administration (BPA) and the Columbia: Mr. Micah Russell, CREST (electronic mail) #12;Oregon Clatsop County ~ City of Astoria ~ City

37

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2011 March 10, 2011 CX-005419: Categorical Exclusion Determination Ostrander Line Swap CX(s) Applied: B4.11 Date: 03/10/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration March 7, 2011 CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005411: Categorical Exclusion Determination Troutdale Substation Control House CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Troutdale, Oregon Office(s): Bonneville Power Administration

38

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, March 5, 2014 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 Mainzer taps Gendron, Ehli to lead Power and...

39

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Northwest publicly owned electric utilities have helped 473 industrial companies save enough energy to power nearly 60,000 homes for a year. PR 02 15 BONNEVILLE POWER...

40

EIS-0076: Bonneville Power Administration Alumax  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration (BPA) developed this EIS for the proposed Alumax primary aluminum reduction plant to determine the environmental, economic and social impacts of plant construction, as well as potential power supply alternatives for BPA.

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

2011 Annual Planning Summary for Bonneville Power Administration...  

Office of Environmental Management (EM)

1 Annual Planning Summary for Bonneville Power Administration (BPA) 2011 Annual Planning Summary for Bonneville Power Administration (BPA) Annual Planning Summaries briefly...

42

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 4, 2013 June 4, 2013 CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010436: Categorical Exclusion Determination Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration June 3, 2013 CX-010435: Categorical Exclusion Determination De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010434: Categorical Exclusion Determination LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

43

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2012 July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 30, 2012 CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration July 27, 2012 CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

44

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 29, 2010 July 29, 2010 CX-003233: Categorical Exclusion Determination Purchase of Conservation Easements on Cottom and Beyeler Properties CX(s) Applied: B1.25 Date: 07/29/2010 Location(s): Lemhi County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003235: Categorical Exclusion Determination Adolfson-Feleding Property (Lavaside Property) Purchase CX(s) Applied: B1.25 Date: 07/22/2010 Location(s): Bingham County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

45

EIS-0183: Bonneville Power Administration Business Plan  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration is considering how to respond to the challenges of a dynamic electric utility industry, and prepared this environmental impact statement to analyze environmental and socioeconomic impacts associated with alternatives to address this challenge.

46

Bonneville Power Administration FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

40 13 Bonneville Power Administration FOR IMMEDIATE RELEASE December 26, 2013 CONTACT: Teresa Waugh, 503-230-7536 or 503-230-5131 BPA seeks comment on draft study of proposed...

47

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

8 13 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Monday, July 29, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA project receives innovation award for new...

48

Steve Wright, Administrator Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

TDO 541.744.3659 ww"" .;'.I-ut': October 10,2008 Steve Wright, Administrator Bonneville Power Administration P.O. Box 3621 Portland, OR 97208-3621 Re: Increase in Slice Product...

49

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

3 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Tuesday, Jan. 27, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 Middle school teams from...

50

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

3 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Friday, Feb. 15, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA launches Science Lab videos for National...

51

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2012 September 19, 2012 CX-009203: Categorical Exclusion Determination Ross Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 19, 2012 CX-009200: Categorical Exclusion Determination Respond to the Town of Eatonville's Land Use Review Request (LURR) CX(s) Applied: B4.7 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009202: Categorical Exclusion Determination Port Angeles Substation Equipment Additions

52

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 6, 2012 February 6, 2012 CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration February 2, 2012 CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration

53

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

a separate billing as perhaps the fundamental concern we have about future regional energy planning. If BPA's Energy Future The Northwest Power and Conservation Council (Council's) draft Fifth Power Plan (draft planDepartment of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208

54

Bonneville Power to evaluate Hydra fuel cell  

Science Journals Connector (OSTI)

Oregon-based Hydra Fuel Cell Corporation is to deliver a beta unit of its proprietary HydraStax hydrogen PEM fuel cell to be tested by the Bonneville Power Administration, a major wholesale power producer in the Pacific Northwest of the US. The HydraStax technology is designed for fixed power applications up to 40 kW.

2006-01-01T23:59:59.000Z

55

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

56

Bonneville Power Administration 1991 Annual Report.  

SciTech Connect

Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

57

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2010 September 15, 2010 CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration September 15, 2010 CX-003906: Categorical Exclusion Determination Fiscal Year 2010 Willamette Basin Mitigation CX(s) Applied: B1.25 Date: 09/15/2010 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration September 10, 2010 CX-003791: Categorical Exclusion Determination Grant Access for Filling Potholes and for Paving Existing Roadway CX(s) Applied: B1.3 Date: 09/10/2010 Location(s): Clallam County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated

58

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2012 December 27, 2012 CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 27, 2012 CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration December 21, 2012 CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the

59

Bonneville Power Admin (Washington) | Open Energy Information  

Open Energy Info (EERE)

Bonneville Power Admin Bonneville Power Admin Place Washington Utility Id 1738 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Industrial: $0.0046/kWh The following table contains monthly sales and revenue data for Bonneville Power Admin (Washington). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS 2009-03 2,220.339 71,908.718 8 2,220.339 71,908.718 8

60

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 9, 2013 April 9, 2013 CX-010153: Categorical Exclusion Determination Chinook Property Funding - Update CX(s) Applied: B1.25 Date: 04/09/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 1, 2013 CX-010156: Categorical Exclusion Determination Chinook Property Funding CX(s) Applied: B1.25

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 8, 2010 June 8, 2010 CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 8, 2010 CX-002771: Categorical Exclusion Determination Marion and Sand Springs Substations Radio Tower Projects CX(s) Applied: B1.19 Date: 06/08/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration June 4, 2010 CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration June 3, 2010

62

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2, 2009 November 2, 2009 CX-000008: Categorical Exclusion Determination Raver-Paul #1 Access Road Improvement and Bridge Replacement CX(s) Applied: B1.3 Date: 11/02/2009 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration October 27, 2009 CX-000007: Categorical Exclusion Determination Spirit Tap to Colville-Boundary #1 Landings and Access Roads Construction CX(s) Applied: B1.3, B1.13 Date: 10/27/2009 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration October 8, 2009 CX-000004: Categorical Exclusion Determination Lane-Wendson #1 Structure 10/5 Access Road Improvement and Pole Replacement Project CX(s) Applied: B1.3 Date: 10/08/2009 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration October 8, 2009

63

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2013 July 16, 2013 CX-010581: Categorical Exclusion Determination Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 10, 2013 CX-010584: Categorical Exclusion Determination Kokanee Bend South Conservation Easement Funding CX(s) Applied: B1.25 Date: 07/10/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 3, 2013 CX-010587: Categorical Exclusion Determination Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013

64

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2011 January 5, 2011 CX-005015: Categorical Exclusion Determination Redland South and Oregon City Microwave Tower Wireless Communication Projects CX(s) Applied: B1.7, B1.19 Date: 01/05/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration December 22, 2010 CX-004850: Categorical Exclusion Determination Marion to Santiam Fiber Installation CX(s) Applied: B4.7 Date: 12/22/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration December 13, 2010 CX-004742: Categorical Exclusion Determination De Moss-Fossil 115-Kilovolt Line Upgrade CX(s) Applied: B4.6 Date: 12/13/2010 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration December 9, 2010 CX-004744: Categorical Exclusion Determination Provision of Funds to Confederated Salish and Kootenai Tribes (CSKT) for

65

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2010 March 16, 2010 CX-001179: Categorical Exclusion Determination Lancaster-Noxon Number 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/16/2010 Location(s): Bonner County, Idaho Office(s): Bonneville Power Administration March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration

66

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2012 May 1, 2012 CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 1, 2012 CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration April 30, 2012 CX-008154: Categorical Exclusion Determination In-Kind Wood Pole Replacements - Driscoll-Naselle Number 1 CX(s) Applied: B1.3 Date: 04/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration April 24, 2012 CX-008156: Categorical Exclusion Determination Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG)

67

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 9, 2011 June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 1, 2011 CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration May 26, 2011 CX-005968: Categorical Exclusion Determination Holcomb Radio Station and Naselle Substation Communication Upgrade Project CX(s) Applied: B1.7 Date: 05/26/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration May 25, 2011 CX-005967: Categorical Exclusion Determination

68

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

associated with electric power generation in the Pacific Northwest. We would appreciate continued focus to provide dependable capacity, and that those resources currently appear most likely to be gas-fired. #12Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208

69

Bonneville Power Administration 1998 Annual Report.  

SciTech Connect

This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

70

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

to provide the Bonneville Power Administration's (BPA) decision for the fish and wildlife protection by the Council at its October and November meetings, and forwarded to BPA on November 20, 2006. BPA appreciates. In evaluating the Council's project recommendations and making BPA's implementation decision, BPA has endeavored

71

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

1 Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 the ISRP and Council agree with us that the UCSRB has produced a very comprehensive and professional are insufficiently developed....The project history section needs to describe the status of the work completed

72

About Us - Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

selling its products and services. BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several other...

73

Bonneville Power Ampere Annex Z-995 Building  

Vancouver, WA The Bonneville Power Administration (BPA), a federal agency headquartered in Portland, Oregon, provides about half of the electricity used in the Pacific Northwest and operates more than three-fourths of the region's high-voltage transmission. Because BPA markets power at cost from 31 federal dams, its rates are among the least expensive electricity in the country. The Ampere Annex project is a renovation of an exisiting 60-year-old standard warehouse building located within the Ross Complex.

74

Energy Department Names Elliot Mainzer Bonneville Power Administration Administrator  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Department announced that Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA).

75

2014 Annual Planning Summary for the Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Bonneville Power Administration.

76

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2011 September 19, 2011 CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration September 16, 2011 CX-006820: Categorical Exclusion Determination Prosser Hatchery Storage Shed CX(s) Applied: B1.15 Date: 09/16/2011 Location(s): Prosser, Benton County, Washington Office(s): Bonneville Power Administration, Natural Gas Regulation September 16, 2011 CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington

77

Management of Bonneville Power Administration's Information Technology Program, IG-0861  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Bonneville Power Management of Bonneville Power Administration's Information Technology Program DOE/IG-0861 March 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 26, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Bonneville Power Administration's Information Technology Program" INTRODUCTION AND OBJECTIVE The Bonneville Power Administration provides about 30 percent of wholesale electric power to regional utilities that service homes, hospitals, financial institutions, commercial entities and military installations in the Pacific Northwest. Bonneville makes extensive use of various

78

Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2013 11, 2013 Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration Karen Boardman, Health Safety and Security, Director, National Training Center Wayne Elias, Fossil Energy, Director, FE-42 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy Efficiency and Renewable Energy, Director, GO-OMA Mary McCune, Nuclear Energy, Director, Office of Facilities Management Peter O'Konski, Office of Management, Director, Office of Administration Jessica Schwersenska, Naval Reactors Laboratory Field Office, Analyst

79

Energy Department Names Elliot Mainzer Bonneville Power Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA), effective today. As one of four Power Marketing Administrations within the...

80

Bonneville Power Admin | Open Energy Information  

Open Energy Info (EERE)

Power Admin Power Admin Jump to: navigation, search Name Bonneville Power Admin Place Oregon Utility Id 1738 Utility Location Yes Ownership F NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png IP - 12 Industrial NR - 12 Industrial PF - 12 Exchange Residential PF - 12 Public - Average Tier 1 + Tier 2 rate Residential PF - 12 Public - Average Tier 1 rate Residential

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EIS-0312: Notice of Availability of the Bonneville Power Administratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish...

82

United States Government Department of Energy Bonneville Power...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Counties, WA; and Nez Perce County, ID Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to install two sections of new...

83

2013 Annual Planning Summary for the Bonneville Power Administration...  

Office of Environmental Management (EM)

Impact Statements for 2013 and 2014 within the Bonneville Power Administration. PMABPANEPA-APS-2013.pdf More Documents & Publications 2012 Annual Planning Summary for...

84

EIS-0030: Bonneville Power Administration's Proposed FY 1980 Program  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this EIS to evaluate the environmental impacts of the proposed fiscal year 1980 construction and maintenance program.

85

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

86

Bonneville Power Administration 1997 Annual Report.  

SciTech Connect

The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

87

EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

88

Northwest Power and Conservation Council Fish and Wildlife Project Funding Recommendations to the Bonneville Power Administration  

E-Print Network (OSTI)

to the Bonneville Power Administration for Fiscal Years 2007 through 2009 October 2006 Programmatic Issues-based obligations into the broader Northwest Power Act program -- it is precisely the fact that Bonneville has to Bonneville that satisfy Bonneville's ESA-based objectives balanced with its broader Northwest Power Act

89

Continuity of Operations at Bonneville Power Administration, IG-0781 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Continuity of Operations at Bonneville Power Administration, Continuity of Operations at Bonneville Power Administration, IG-0781 Continuity of Operations at Bonneville Power Administration, IG-0781 In the event of a major disruption to its nonnal operations, Bonneville must be prepared to continue its essential functions, particularly its power scheduling, tra~lsmission scheduling, and system operations. In this regard, Bonneville is required to follow Federal Preparedness Circular 65 (FPC 65), as prescribed by the Department of Homeland Security's Federal Emergency Management Agency. Under FPC 65, agencies are to develop viable contingency plans. The Circular also provides a number of key steps that agencies should take for continuity of operations. Specifically, it recommends that each agency: ( I ) prepare alternate operating facilities; (2)

90

DOE Names Bill Drummond As New Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Bill Drummond As New Bonneville Power Administration Names Bill Drummond As New Bonneville Power Administration Administrator DOE Names Bill Drummond As New Bonneville Power Administration Administrator January 16, 2013 - 7:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department has chosen Bill Drummond to be the new Administrator for the Bonneville Power Administration (BPA), one of the four Power Marketing Administrations (PMAs) the Department oversees. As BPA's Administrator, Drummond will be responsible for managing the non-profit federal agency, which markets carbon-free power from Columbia River hydroelectic dams and operates the surrounding power grid, distributing wind, nuclear and other energy to the Pacific Northwest and beyond. Drummond's leadership of BPA is part of a larger strategy for

91

The Skycrane at the Bonneville Power Administration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration August 2, 2010 - 10:44am Addthis Daniel B. Poneman Daniel B. Poneman Deputy Secretary of Energy What does this project do? The project is now on schedule and under budget. The Skycrane helped overcome challenging environmental conditions. It also made the work safer for workers on the ground. The project is expected to employ approximately 140 people at its peak. For a striking glimpse of a power grid rapidly evolving to handle renewable power, look to the Bonneville Power Administration in the Pacific Northwest. Crews just finished using a Skycrane helicopter to assemble 65 steel towers for a new high-voltage transmission line to move wind power throughout the region.

92

Me Stephen J. Wright Administrator Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 200R Me Stephen J. Wright Administrator Bonneville Power Administration P.O. Box 3621 Portland. Oregon 97208-362 Re: Slice Product Subscription Dear Steve: As public agency...

93

2012 Annual Planning Summary for Bonneville Power Administration...  

Office of Environmental Management (EM)

Impact Statements for 2012 and 2013 within Bonneville Power Administration. APS-2012-BPA.pdf APS-2012-BPA.xls More Documents & Publications 2013 Annual Planning Summary for the...

94

EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energys Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

95

Bonneville Power Administration Overview As of December 1, 2014  

NLE Websites -- All DOE Office Websites (Extended Search)

Bonneville Power Administration Overview As of December 1, 2014 Moody's: Aa1Stable S&P: AA-Stable Fitch: AAStable Grand Coulee Dam High Voltage Transmission Columbia Generating...

96

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: 2: Appendices DOE/EIS-0312 April 2003 Appendix A Fish and Wildlife Funding Principles for Bonneville Power Administration Rates and Contracts Fish and Wildlife Implementation Plan EIS Appendix A: Fish and Wildlife Funding Principles Appendix A/ 1 Appendix A FISH AND WILDLIFE FUNDING PRINCIPLES FOR BONNEVILLE POWER ADMINISTRATION RATES AND CONTRACTS September 16, 1998 Preamble The purpose of these principles is to conclude the fish and wildlife funding process in which Bonneville has been engaged with various interests in the Region, and provide a set of guidelines for structuring Bonneville's subscription and power rate processes. The principles are intended to "keep the options open" for future fish and wildlife decisions that are anticipated to be made in late 1999 on reconfiguration of the hydrosystem and in

97

BPA Integrated Program Review 1 Bonneville Power Administration  

E-Print Network (OSTI)

BPA Integrated Program Review 1 Bonneville Power Administration Summary of public comments to BPA Northwest Power & Conservation Council Meeting #12;BPA Integrated Program Review 2 Integrated Program Review Process Purpose of Integrated Program Review: · Present all BPA's costs (Power, Transmission and Agency

98

Bonneville Power Administration Yakima Fisheries Project; 13Sept1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION YAKIMA FISHERIES PROJECT (YFP) RECORD OF DECISION Summary. As Administrator of the Bonneville Power Administration (BPA), I have decided to implement Alternative 2 of the proposed Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin in south- central Washington. The project responds directly to a need for knowledge of viable means to rebuild and maintain naturally spawning anadromous fish stocks in the Yakima Basin. Alternative 2 would experimentally supplement depressed populations of upper Yakima spring chinook salmon that spawn naturally, as well as undertake a study to determine the feasibility of re-establishing a naturally spawning population and significant fall fishery for coho salmon (now eliminated in the Basin).

99

EIS-0093: Bonneville Power Administration's 1982 Rate Proposal  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's Bonneville Power Administration prepared this statement to evaluate the potential environmental impacts associated with an increase in wholesale power rates for calendar year 1982, including the effects of rate hikes in that year, the cumulative effects of rate hikes from 1979-1985, as well as alternative revenue scenarios.

100

EIS-0031: Bonneville Power Administration 1979 Wholesale Rate Increase  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration (BPA) developed this statement to explain the reasons for BPA's proposed power rate schedule, to conduct an analysis of the impacts which the proposal or alternatives thereto could have on both physical and socioeconomic characteristics of the human environment and to identify methods for mitigating the effects of the proposal.

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0162: Bonneville Power Administration (BPA) Resource Programs  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energys Bonneville Power Administration (BPA) developed this programmatic environmental impact statement to support decisions to be made in several future efforts to identify the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers.

102

Bonneville Power Administration 1993 Annual Report.  

SciTech Connect

For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

103

EIS-0095: Bonneville Power Administration's Expanded Residential Weatherization Program  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's Bonneville Power Administration prepared this statement to examine the environmental impacts of an expansion of the existing Residential Weatherization Program to include air-infiltration reducing (tightening) measures, such as storm windows and doors, insulation, weather-stripping and other improvements.

104

EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700 -foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line.

105

EIS-0060: Bonneville Power Administration Proposed FY 1981 Program  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 78 existing substations.

106

Inspection of surveillance activities and administrative leave policy at Bonneville Power Administration, Portland, Oregon  

SciTech Connect

The authors conducted an inspection of surveillance activities and administrative leave policy at the Bonneville Power Administration, Portland, Oregon. The purpose of their inspection was to determine if a covert video surveillance operation conducted at Bonneville Power Administration was consistent with Department of Energy policies and procedures and other applicable regulations and procedures, and to determine if administrative leave policies and procedures used at Bonneville Power Administration in a specific instance were consistent with Department of Energy requirements and the Code of Federal Regulations. This inspection focused on a specific incident that occurred in 1989 on the 5th floor of the BPA Headquarters Building located in Portland, Oregon. The incident involved the soiling of an employee`s personal property with what appeared to be urine.

Not Available

1994-04-01T23:59:59.000Z

107

STATEMENT FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR THE RECORD FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE JUNE 20, 2013 REGARDING RESOURCE ISSUES IN THE KLAMATH RIVER BASIN The U.S Department of the Interior's Bureau of Reclamation (Reclamation) has approached the Bonneville Power Administration (BPA) with a request to provide Federal power service to the Klamath Basin Irrigation Project's load. This request was made to the Administrator by letter received on August 27, 2009, requesting a contract(s) for the purchase and delivery of power to serve existing Reclamation load within the Klamath Project in Oregon. The letter noted the load was approximately 10 average megawatts and currently is served by PacifiCorp. The Klamath

108

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

energy, enough to power about half a million Northwest homes when the wind is blowing. BPA also will hold two "Meet the Builder" open- houses in late April. The new 38-mile,...

109

Bonneville Power Administration Program Specific Recovery Plan...  

Energy Savers (EERE)

Power Administration Program Specific Recovery Plan Microsoft Word - PSRP May 15 2009 BPA Final.docx More Documents & Publications Microsoft Word - PSRP Updates 6-25-10v2...

110

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

CONTACT: Joel Scruggs, jlscruggs@bpa.gov, 503-230-5511 503-230-5131 Northwest public utilities, BPA top five-year energy savings target Public power, BPA have saved at least 560...

111

Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA  

E-Print Network (OSTI)

Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA Bonneville is a regional agency that markets federal hydropower and augments its power supply with market, everyday citizens, to pay illegally inflated power costs. Because of this, Bonneville should have the legal

112

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Accord Funds Dear Mr. Schriever: BPA Power Administration (BPA) received the Idaho Department of Fish-607-00 to the Snake River Sockeye Captive Propagation project 2007-402- 00. BPA acknowledges the change in priorities the Biological Opinion. BPA supports of your request to place priority for use of these funds on the Snake River

113

EIS-0005: Bonneville Power Administration FY 1979 Program  

Energy.gov (U.S. Department of Energy (DOE))

This final statement is one of a series prepared annually by BPA on each fiscal year's proposed construction and maintenance program. This statement covers the potential impact of the major new facilities and maintenance programs proposed for fiscal year 1979. It must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The ""Role EIS""), particularly Appendix B - BFA Power Transmission.

114

EIS-0125: Bonneville Power Administration Intertie Development and Use  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long term Intertie Access Policy and enabling firm power marketing between California and the Northwest in order to make possible additional short-and long-term sales of the Federal power surplus. The Western Area Power Administration cooperated in the preparation of this EIS by virtue of its special expertise concerning the Third Alternating Current/California-Oregon Transmission Project.

115

Environmental audit, Bonneville Power Administration, lower Columbia area  

SciTech Connect

This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

Not Available

1990-11-01T23:59:59.000Z

116

EIS-0066: The Role of Bonneville Power Administration in the Pacific Northwest Power Supply System- including its Participation in a Hydro-Thermal Power Program  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration (BPA) prepared this EIS to examine the environmental impacts of the Pacific Northwest Power Planning and Conservation Act, which will foster regional electric power planning in the four Northwest states, as well as increase BPAs authority to address future power needs.

117

Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year contract to purchase the electrical output from a natural gas fired combustion turbine facility at a total cost of about $2.2 billion. Bonneville's resource acquisitions were to be made only after its planning process showed that demand for its electricity would exceed its available resources. In

118

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: 1: Environmental Analyses DOE/EIS-0312 April 2003 Fish and Wildlife Implementation Plan Final Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Fish and Wildlife Implementation Plan States and Provinces Involved: Arizona, California, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming, and British Columbia Abstract: Despite the efforts of BPA and other regional entities in the Pacific Northwest, some populations of fish and wildlife continue to decline. Reasons for the lack of success include the following: different groups have different values and priorities; there is no clear and agreed-upon scientific answer; and there are conflicting

119

The Future of the Bonneville Power Administration: Aggressive Competitor or Bureaucratic Dinosaur?  

Science Journals Connector (OSTI)

Splitting the Bonneville Power Administration into fully separate generating and transmission entitities is the only step, short of privatization or regionalization, that would eliminate the conflict between compliance with the Federal Energy Regulatory Commissions open access requirements and the need to maximize Bonneville Power Administration revenues for taxpayers.

Randall W. Hardy

1999-01-01T23:59:59.000Z

120

Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Inquiry Report Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration DOE/IG-0895 October 2013 Department of Energy Washington, DC 20585 October 3, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Inquiry: "Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration" BACKGROUND The Department of Energy's Bonneville Power Administration (Bonneville) is a self-funding entity that covers its costs by marketing wholesale electrical power from 31 Federal hydro projects. It is responsible for operating and maintaining about three-fourths of the high-voltage transmission in the Pacific Northwest. Bonneville's 3,100 employees represent 20 percent of the

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Applying planning models to study new competition: Analysis for the Bonneville Power Administration  

Science Journals Connector (OSTI)

An integrated electric utility planning model, the Resource Policy Screening Model (RPSM), was used to project acquisitions from independent power producers made by customers of a US power marketing authority. Bonneville Power Administration (BPA) markets power from dams in the Pacific Northwest to retail utilities. BPA's historical cost advantage has eroded and customers are evaluating more costly nonutility generation to meet future load growth. If some customers will pay a premium above BPA rates for power, how much load could BPA lose? Steps in the analysis are presented. RPSM is a system dynamics model used in energy policy studies since 1983. This study marked the first application for understanding effects of electric industry deregulation on BPA. RPSM was modified, potential nonutility supplies were forecast, and scenario simulations of acquisitions, loads and rates were performed for utilities in the region. Later, the study method was adapted for other uses at BPA.

Franklin Neubauer; Erik Westman; Andrew Ford

1997-01-01T23:59:59.000Z

122

Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory  

SciTech Connect

The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

Lee, A.D.; Conger, R.L.

1996-06-01T23:59:59.000Z

123

EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

124

Bonneville Power Administration and the Industrial Technologies Program Leverage Support to Overcome Energy Efficiency Barriers in the Northwest  

Energy.gov (U.S. Department of Energy (DOE))

This case study explores how Bonneville Power Administration, a Northwest regional wholesale power provider, rethought how to encourage and promote energy efficiency projects through its utilities.

125

An Analysis of the Effects of Background Variables on Attitudes and Policy at the Bonneville Power Administration.  

E-Print Network (OSTI)

?? The question is asked whether or not background, education, and training of middle and upper level bureaucratic personnel affects policy outcomes. The Bonneville Power (more)

Millam, Philip George

1973-01-01T23:59:59.000Z

126

Sixth Northwest Conservation and Electric Power Plan Chapter 13: Bonneville's Obligations  

E-Print Network (OSTI)

....................................................................................................................... 14 Assessing Fish and Wildlife Costs and Accomodating Fish and Wildlife Operations include additional firm energy, capacity, and flexibility for integrating wind power into Bonneville's balancing area. Its obligations to provide flexibility for wind-power balancing also are driven by its

127

Rethinking Bonneville  

Science Journals Connector (OSTI)

The restructuring of the Bonneville Power Administration is past due. Its mandate of rural electrification has been long accomplished, and at this point the only result from the current setup is to continue providing taxpayer-subsidized low rates to a segment of the Northwest population that is neither poor nor rural.

Richard Munson

2001-01-01T23:59:59.000Z

128

Bonneville Power Administration South Oregon Coast Reinforcement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Federal Register / Vol. 63, No. 61 / Tuesday, March 31, 1998 / Notices President of Utility Contracting, Citizens Power Sales, 160 Federal Street, Boston, Massachusetts 02110. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by the DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. Issued in Washington, DC on March 24, 1998. Anthony J. Como, Manager, Electric Power Regulation, Office of Coal and Power Im/Ex, Office of Coal and Power Systems, Office of Fossil Energy.

129

Design and Operation of the 30 MJ Superconducting Magnetic Storage System on the Bonneville Power Administration Bus  

Science Journals Connector (OSTI)

A superconducting magnetic energy storage (SMES) unit is suitable for power system stablization because it can provide positive ... was installed at the Tacoma Substation of the Bonneville Power Administration as...

R. I. Schermer; M. H. Barron; H. J. Boenig

1984-01-01T23:59:59.000Z

130

Bonneville Power Administration Stephen J. (Steve) Wright, Administrator  

E-Print Network (OSTI)

innovations associated with development of a Smart Grid, renewed focus on energy efficiency and progress is working with the region to integrate as much as 6,000 megawatts of wind energy into the regional grid of the region's greatest energy challenges ­ among them, developing power contracts that preserve the value

131

The Future Role of the Bonneville Power Administration in Power Supply  

E-Print Network (OSTI)

repayment at risk, the pressure for "reform," such as privatization, intensifies. Over the last decade costs are 1 E.g. see Rethinking Bonneville ­ Why BPA Must Be Reformed, Richard Munson, Northeast

132

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

133

Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF BONNEVILLE POWER ADMINISTRATION'S MANAGEMENT OF INFORMATION RESOURCES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/ig

134

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

SciTech Connect

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

135

How may a customer exploit the Bonneville Power Administration's new pricing scheme?  

Science Journals Connector (OSTI)

For more than half a century, the Bonneville Power Administration (BPA) has marketed electricity produced by the Federal Columbia River Power System (FCRPS) to its 'preference' customers in the Pacific Northwest. It has historically met the growing needs of its preference customers by augmenting the power provided by the FCRPS with market purchases and recovering its costs through its cost-based rates. The BPA, however, is preparing to implement a new pricing scheme intended to balance its historical commitment to supply its customers with low-cost power from the FCRPS with the need to signal that growing demands are met with increasingly expensive generation resources. This paper describes an opportunity that may exist for customers to exploit the scheme to obtain a larger share of low-cost federal power going forward. We show that when all customers take advantage of the opportunity, they find themselves in a form of the prisoner's dilemma whose outcome is a lose-lose Nash equilibrium, and discuss its managerial implications.

Doug Allen; Ira Horowitz; Chi-Keung Woo

2011-01-01T23:59:59.000Z

136

Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE))

This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

137

Accident Investigation of the September 20, 2012 Fatal Fall from the Dworshak-Taft #1 Transmission Tower, at the Bonneville Power Marketing Administration  

Energy.gov (U.S. Department of Energy (DOE))

This report is an independent product of the Level l Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Levell Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting

138

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

139

The Electric Power Research Institute  

Science Journals Connector (OSTI)

...program for the elec-tric power industry. EPRI selects and...systems-Tennessee Valley Authority and the Bonneville Power Administration. About 150 non-member utilities...Tennessee Valley Au-thority and Bonneville Power Adminis-tration, no...

Chauncey Starr

1983-03-11T23:59:59.000Z

140

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

142

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

143

Data Collection for the Bonneville Power Administration Project on Wind Loading of Transmission Conductors  

Science Journals Connector (OSTI)

ABSTRACT The Bonneville Power Administration (BPA) project, Wind Effects on Conductors for Span Factors was established to determine the relationship between actual and theoretical wind loads on overhead transmission conductors. This study aims to improve BPA transmission line design methods and criteria as they relate to wind conditions in the Pacific Northwest. For the past seven years, BPA has collected data from seven sites in the Pacific Northwest. Measurements of wind speeds and directions, ambient temperatures and barometric pressures, and conductor swing angles enable engineers to compare measured wind loads on conductors to theoretical values. Impact of such variables as height of conductor, span lengths and conductor diameter are also investigated. Three sites were instrumented with vertically arranged anemometers to measure wind speed as a function of height above ground. This paper covers site determination, instrumentation, data collection, and some site maintenance and operation challenges. The maintenance and manipulation of the very large data base that has been collected is discussed. As data analysis is not yet finished, final results are not included.

H.W. VOLPE

1987-01-01T23:59:59.000Z

144

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

145

EIS-0048-S: Bonneville Power Administration Proposed FY 1976 Program Facility Location, Okanogan Area Service, Douglas and Okanogan Counties, WA, Supplemental  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this facility location supplemental statement to address a proposal for transmission facilities to serve the Okanogan Valley, Washington. This statement is a supplement to Department of the Interior FES 75-79.

146

EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental  

Energy.gov (U.S. Department of Energy (DOE))

This statement, one of a series prepared by the U.S. Department of Energys Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

147

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

148

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

SciTech Connect

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

149

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

150

EIS-0030-S: Bonneville Power Administration Proposed FY 1980 Program, Facility Location Supplement, Northwest Montana/North Idaho Support and Libby Integration, Supplemental  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration developed this supplemental statement to evaluate the environmental impacts of proposed alternative actions to alternative actions intended to address the need for reliability of electrical service to loads in Northwest Montana and North Idaho and the need for integrating the generation being added at Libby Dam into the Federal Columbia River Power System.

151

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

152

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

153

Bonneville's conservation policy analysis models  

Science Journals Connector (OSTI)

This paper describes computer simulation models used by the Bonneville Power Administration (Bonneville) to help analyse conservation policies for the Pacific Northwest. We begin with a description of electricity resource planning in the Pacific Northwest in general and conservation planning at Bonneville in particular. We describe the purpose, structure and applications of two models developed for Bonneville's Office of Conservation. Our description emphasizes the special features which make the models useful in resource strategy studies where a wide variety of policies are to be analysed in a short time period. We present results from recent applications including an analysis of conservation programme impacts in the face of a capacity surplus. We also discuss a simple analysis of the relative risk of alternative conservation strategies in the face of long-term uncertainties in loads and resources.

Andrew Ford; Michael Bull; Roger F. Naill

1987-01-01T23:59:59.000Z

154

EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental  

Energy.gov (U.S. Department of Energy (DOE))

This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

155

Record of Decision for the Bonneville Power Administration's Service to Direct Service Industrial Customers for Fiscal Years 2007-2011  

SciTech Connect

Beginning in July 2004, the Bonneville Power Administration (BPA) initiated the Regional Dialogue process as part of its effort, in cooperation with its customers and constituents, to identify and decide issues regarding BPA's power supply role for FY 2007-2011. BPA service to Direct Service Industries (DSIs) has been steadily declining since the pre-1995 period when contracts totaled over 3,000 aMW, to 1995 when contracts were reduced to 2,000 average megawatts (aMW), to 2002 when contracts were reduced to 1,500 aMW (with much less actually delivered in the 2002-2006 period). Over the same period, BPA service to public utilities has grown significantly. Among the issues presented by BPA was whether it should continue the steady ramp-down of service to its DSI customers when existing power supply contracts with those customers expire on Sept. 30, 2006, or whether to eliminate further service. BPA proposed providing up to 500 aMW of service (cumulative) to creditworthy DSIs, at a known and capped cost, where such service would enable continued operation of DSI facilities, thereby maintaining Pacific Northwest jobs. BPA indicated that, in order to eliminate the market and default risks to BPA associated with a traditional ''take-or-pay'' physical power sales contract, and to meet the known and capped cost prerequisite for DSI service, its preferred alternative was to provide service benefits to the DSIs financially, by cashing-out, or monetizing, the value of a power sales contract in lieu of physically delivering power. BPA indicated also that it believed it was unlikely that service to the DSIs under the Industrial Firm Power (IP) rate schedule would provide a rate low enough to support economic operation by DSI customers that use BPA power to smelt aluminum. The aluminum smelters would make up over 95% of BPA's DSI load under a 500 aMW scenario. The proposal to provide 500 aMW of service benefits to the DSIs represented a continuation in the ramping-down of BPA's role as a supplier of power service to the DSIs.

N /A

2005-06-30T23:59:59.000Z

156

Western Area Power Administration Borrowing Authority, Recovery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act Microsoft Word - PSRP May 15 2009 WAPA...

157

Department of Energy, Bonneville Power Administration Delivery of the Canadian Entitlement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

349 349 Federal Register / Vol. 64, No. 75 / Tuesday, April 20, 1999 / Notices which is available free at either of the preceding sites. If you have questions about using the pdf, call the U.S. Government Printing officer toll free at 1-888-293-6498. Note: The official version of this document is the document published in the Federal Register. Program Authority: 20 U.S.C. 7131. Dated: April 16, 1999. (Catalog of Federal Domestic Assistance Number 84.184H Office of Elementary and Secondary Education-Safe and Drug-Free Schools and Communities National Programs-Federal Activities -State and Regional Coalition Grant Competition to Prevent High-Risk Drinking Among College Students) Judith Johnson, Acting Assistant Secretary for Elementary and Secondary Education. [FR Doc. 99-10025 Filed 4-19-99; 8:45 am]

158

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (05/31/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUPPLEMENT TO ADMINISTRATOR'S RECORD OF DECISION ON SUPPLEMENT TO ADMINISTRATOR'S RECORD OF DECISION ON BONNEVILLE POWER ADMINISTRATION'S SERVICE TO DIRECT SERVICE INDUSTRIAL (DSI) CUSTOMERS FOR FISCAL YEARS 2007-2011 ADMINISTRATOR'S RECORD OF DECISION Bonneville Power Administration U.S. Department of Energy May 31, 2006 1 Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 I. Background On February 4, 2005, Bonneville Power Administration (BPA) sent a letter to customers and constituents describing a public process for comments on certain issues related to service by BPA to its remaining direct service industrial (DSI) customers that had not been finally decided in the Policy For Power Supply Role For Fiscal Years 2007-

159

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (06/19/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

266 Federal Register 266 Federal Register / Vol. 71, No. 117 / Monday, June 19, 2006 / Notices Education, Room 5C141, 400 Maryland Avenue, SW., Washington, DC 20202. [FR Doc. 06-5528 Filed 6-16-06; 8:45 am] BILLING CODE 4000-01-M DEPARTMENT OF ENERGY Bonneville Power Administration Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: BPA Administrator Stephen J. Wright signed a supplement to the Administrator's Record of Decision (ROD) on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011. The original

160

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Low Income Energy Efficiency Workgroup Meeting 2 Date: January 27, 2014 Time: 8:30 am-12:30 pm Pacific Location: PNGC, 711 Halsey Street, Portland and by phone LiveMeeting click...

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy for Allocating Energy Efficiency Savings Introduction Under the Post-2011 framework, BPA assumes that public utility customers will self-fund, 1 Definition i.e., not request...

162

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Low Income Energy Efficiency Workgroup Meeting 1 Date: November 6, 2014 Time: 1:00 pm - 4:30 pm Pacific Location: PNGC, 711 Halsey Street, Portland and by phone LiveMeeting click...

163

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

concurrent Arrow provisional draft rights under the Libby Coordination Agreement (LCA), LCA provisional draft rights will take precedence and energy deliveries under this...

164

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

to make funds available in the Unassigned Account As we begin fiscal year 2015 BPA is allocating approximately 3.66 million to the Unassigned Account. These funds were originally...

165

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Payment Calculator The performance payment calculator will be used only Instructions when a utility wants to request less than the maximum total performance payment...

166

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Non-Reportable Deemed Measures & Custom Projects These instructions are supplemental to the existing instructions for the Deemed Measure Upload Template and the Option 2 Custom...

167

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Brown Bag: Simple Steps Program Update Presentation When: Thurs., Dec. 11, 2014 Time: 12:00 - 1:00 p.m. PST Presentation and Discussion: BPA recently re-competed the Simple Steps,...

168

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

minimize customers switching between options to create simplicity in reporting and administration and avoid potential oversights. If circumstances change and Option 2 becomes...

169

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Brown Bag: Simple Steps Program Update Presentation When: Wed., Dec. 3, 2014 Time: 12:00 - 1:00 p.m. PST Presentation and Discussion: BPA recently re-competed the Simple Steps,...

170

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

2 minimize switching back and forth between options to create simplicity in reporting and administration. If circumstances change and Option 2 becomes burdensome for a utility BPA...

171

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

June 20, 2014 Time: 9:00 am - 3:00pm Pacific Location: BPA Rates Hearing Room 1201 Lloyd Blvd, Suite 200, Portland, Oregon or by LiveMeeting Click here and telephone...

172

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

8312012 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N File Naming Tool: Detailed Instructions 1. Select the Cell Labeled Document Type and use the dropdown menu to...

173

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Retail Sales Allocation Tool (RSAT) Now Available for FY2015 The Simple Steps program is happy to announce the Retail Sales Allocation Tool (RSAT) for FY2015. There are some great...

174

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Progress Payment Calculator The Progress Payment Calculator allows utilities to submit detailed information for the qualifying pre-approved progress payments. In order to qualify...

175

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Update on Fast-Moving Residential LED Measures The current BPA Residential Lighting measures provided in the Interim Reference Deemed Measure List do not include savings or payment...

176

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Rules Regarding the Large Project Fund (LPF) Updated: February 21, 2012 The Large Project Fund (LPF) will be used to provide incentives to customer utilities (customers)...

177

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Interim Reporting Solution: File Naming Tool What it is: The interim reporting system which will be conducted through BPA's Customer Portal will require that documents submitted...

178

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

942012 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Overview: Performance Payment Calculator What it is The Performance Payment Calculator is the tool BPA has...

179

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview: Progress Payment Calculator What it is The Progress Payment Calculator allows utilities to submit detailed information for the qualifying pre- approved progress payments....

180

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance on Bilateral Transfers of Energy Efficiency Incentive Funds Introduction As part of BPA's Energy Conservation Agreements (ECA), each of BPA's public utility customers,...

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

VK-22 a.k.a. tract V-K-2-A-22 along the Vancouver-Kelso transmission line operated as Ross-Lexington No. 1; including any amendments to same." Response: BPA has provided all...

182

Bonneville Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

under the Freedom of Information Act (FOIA), 5 U.S.C. 552. Enclosed please find our CD-ROM containing "...the mean 15 minute load for the months of Jul) and December 2009 for the...

183

BONNEVILLE POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Email stever@abacusrm.com rons@abacusrm.com Company Airclean Technologies Expertise Pumps, fans, and motor systems. Pulp & paper, petroleum, cement, steel, wastewater, wood...

184

DOE/EIS-0312; Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft EIS (5/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft EIS Draft EIS "Piecing The Puzzle Together" DOE/EIS-0312 June 2001 B i o l o g i c a l O p i n i o n s P u b l i c B e n e f i t s P a c i f i c S a l m o n T r e a t y C o l u m b i a R i v e r F i s h e r y M a n a g e m e n t P l a n S t a t e P la n s T r i b a l P l a n s A r t i f i c i a l P r o p a g a t i o n B . A . L o w e r S n a k e F e a s i b i l i t y S t u d y E I S Wy-Kan-Ush- Mi Wa- Kush-Wit P o w e r C o u n c i l P l a n M O A ( M e m o r a n d u m o f A g r e e m e n t ) F e d e r a l C a u c u s A l l H P a p e r Wildlife Program EIS F r a m e w o r k P a p e r W a t e r s h e d M g m t . P r o g r a m E I S S O R E I S ( S y s t e m O p e r a t io n s R e v i e w ) BPA Business Plan EIS I C B E M P E I S ( I n t e r io r C o l u m b ia B a s in E c o s y s t e m M g m t . P r o je c t ) Governance Structure C a n a d i a n I s s u e s P r i v a t e I n t e r e s t s C o m m e r c i a l I n t e r e s t s ? ? Volume 1: Environmental Analyses Fish and Wildlife Implementation Plan DEIS Cover Sheet Fish & Wildlife Implementation Plan Draft Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA)

185

Bonneville and West Coast Electric Markets  

Science Journals Connector (OSTI)

A critic of the Bonneville Power Administration is correct that BPAs long-term role deserves prompt review. But there are many better alternatives than the market pricing that he proposes.

Jim Harding

2002-01-01T23:59:59.000Z

186

PP-30 New York Power Authority | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New York Power Authority PP-30 New York Power Authority Presidential permit authorizing New York Power Authority to construct, operate, and maintain electric transmissionf...

187

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multnomah and Hood River Counties, Oregon Summary Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild...

188

Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (7/25/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summit/Westward Project Summit/Westward Project July 2003 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan

189

American Samoa Power Authority | Open Energy Information  

Open Energy Info (EERE)

Samoa Power Authority Samoa Power Authority Jump to: navigation, search Name American Samoa Power Authority Place American Samoa Utility Id 40429 Utility Location Yes Ownership S NERC Location AS Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Retail Marketing Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=American_Samoa_Power_Authority&oldid=408977"

190

Guam Power Authority | Open Energy Information  

Open Energy Info (EERE)

Guam Power Authority Guam Power Authority Jump to: navigation, search Name Guam Power Authority Place Hagatna, GU Utility Id 40428 Utility Location Yes Ownership S NERC Location GU Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Guam Power Authority Smart Grid Project was awarded $16,603,507 Recovery Act Funding with a total project value of $33,207,014. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

191

Silicon Valley Power and Oklahoma Municipal Power Authority Win 2014 Public Power Wind Awards  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Department and the American Public Power Association named Oklahoma Municipal Power Authority and Silicon Valley Power as the winners of the 2014 Public Power Wind Awards.

192

Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas  

SciTech Connect

The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

Makarov, Yuri V.; Yang, Bo; DeSteese, John G.; Lu, Shuai; Miller, Carl H.; Nyeng, Preben; Ma, Jian; Hammerstrom, Donald J.; Vishwanathan, Vilanyur V.

2008-06-30T23:59:59.000Z

193

New York Power Authority | Open Energy Information  

Open Energy Info (EERE)

Power Authority Power Authority Jump to: navigation, search Name New York Power Authority Place New York Utility Id 15296 Utility Location Yes Ownership S NERC Location NPCC NERC NPCC Yes ISO NY Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Buying Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 1 Commercial 10 Commercial 1B Commercial 20 Commercial 21 Commercial 2B Commercial 37 Commercial

194

Arkansas River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Arkansas River Power Authority Place Colorado Website www.arpapower.org/ Utility Id 712 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

195

Platte River Power Authority | Open Energy Information  

Open Energy Info (EERE)

River Power Authority River Power Authority Jump to: navigation, search Name Platte River Power Authority Place Colorado Website www.prpa.org/ Utility Id 15143 Utility Location Yes Ownership P NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

196

Cooperative Efforts by the Bonneville Power Administration to Promote Ferruginous Hawk Nesting on the Department of Energy's Hanford Reservation in Washington State  

Science Journals Connector (OSTI)

Publisher Summary The ferruginous hawk (Buteo regalis) is the largest soaring hawk in the United States with a maximum wingspan up to 1.32 meters (5 ft). The species is common to the grasslands and steppe areas of the western United States. The ferruginous hawk (Buteo regalis) was once common to the grassland areas of Washington State. The Washington State Department of Fish and Wildlife has identified nine territorial pairs that are using Bonneville Power Administration towers on the Hanford Reservation site in Central Washington. These pairs represent 18% of the active nesting population in 2002 of this threatened species as designated by the State. Ferruginous hawks did not range widely on the Reservation until specific transmission towers were introduced on the reservation in the 1970s. The nests are 2-3 ft. in diameter and are made of interwoven sagebrush stems in the lower part of the transmission tower body. To provide a better nesting site for the hawks, wood-nesting platforms were installed in the winter of 2003. These platforms are one-meter in diameter and are designed to prevent the nest from blowing out of the tower during high winds. A review of the nest platforms during the summer of 2003 indicated that at least one breeding pair that produced fledgling young occupied one nest. In 2004, with the assistance of ThermoSight, Inc, a remote camera was installed over the nest to observe and record the hawks during the nesting season.

William T. Erickson; James W. Watson; Bill Hubbard

2008-01-01T23:59:59.000Z

197

Long Island Power Authority | Open Energy Information  

Open Energy Info (EERE)

Long Island Power Authority Long Island Power Authority Address 333 Earle Ovington Blvd Place Uniondale, New York Zip 11553 Sector Services Product Green Power Marketer Website www.lipower.org/ Coordinates 40.720549°, -73.593524° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.720549,"lon":-73.593524,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

198

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release

199

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

200

PP-22 British Columbia Hydro and Power Authority, Amendment 1967  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmision facilities at the U.S-Canadian border.

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

PP-369 British Columbia Hydro and Power Authority  

Energy.gov (U.S. Department of Energy (DOE))

Presidential Permit authorizing British Columbia and Power Authority to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

202

Records Schedule-Alaska Power Authority  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-109 PREVIOUS EDITION NOT USABLE STANDARD FORM SF 1 15 (REV 3-91) -109 PREVIOUS EDITION NOT USABLE STANDARD FORM SF 1 15 (REV 3-91) Prescr~bed by NARA 36 CFR 1228 REQUEST FOR RECORDS DISPOSITION AUTHORITY To NATIONAL ARCIIIVES and RECORDS ADMINISTRATION (NIR) WASHINGTON, DC 20408 1 FROM (Agency or establ~shment) Department o f Energy 2 MAJOR SUBDIVISION Alaska Power Administration 3 MINOR SUBDIVISION 4 NAME OF PERSON WITH WHOM TO CONFER Carol Holmberg JOB NUMBER N1-447-97- 1 DATE RECEIVED .'I+ 46 NOTIFICATION TO AGENCY In accordance ~ 7 t h thc prov~sions of 44 U S C 3303a, the d~spos~tion request, including amendments, is approved except for items that may be marked "dlspos~tion not approved or "withdrawn" In column 10 5 TELEPHONE (907)586-7405 DATE 1 t,- -'?x 6 AGENCY CERTIFICATION I hearby certify that I am author~zed to act for thls agency in matters pertalnlng to the dlpsositi

203

With the onset of fall and the return of school, the Bonneville...  

NLE Websites -- All DOE Office Websites (Extended Search)

1 14 Bonneville Power Administration FOR IMMEDIATE RELEASE Friday, Jan. 10, 2014 CONTACT: Kevin Wingert, 503-230-4140503-230-5131 Public input sought on potential habitat...

204

A new full-color book goes behind the scenes at the Bonneville...  

NLE Websites -- All DOE Office Websites (Extended Search)

9 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, Oct. 1, 2014 CONTACT: Kevin Wingert, 503-230-4140503-230-5131 BPA Regional Science Bowl Registration Opens...

205

New York Power Authority - Energy Services Programs for Public Entities |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Authority - Energy Services Programs for Public Power Authority - Energy Services Programs for Public Entities New York Power Authority - Energy Services Programs for Public Entities < Back Eligibility Institutional Local Government Schools Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Bioenergy Solar Buying & Making Electricity Water Heating Program Info State New York Program Type State Rebate Program Rebate Amount Not Specified Provider New York Power Authority New York Power Authority (NYPA) provides energy efficiency improvements to eligible public sector organizations at no up-front cost. A range of energy

206

Oklahoma Municipal Power Authority - Commercial and Industrial Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Municipal Power Authority - Commercial and Industrial Oklahoma Municipal Power Authority - Commercial and Industrial Energy Efficiency Program Oklahoma Municipal Power Authority - Commercial and Industrial Energy Efficiency Program < Back Eligibility Commercial Industrial Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Heating Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate $100,000 Program Info Funding Source American Recovery and Reinvestment Act of 2009 State Oklahoma Program Type Utility Rebate Program Rebate Amount Matching Funds up to $100,000 Provider Oklahoma Municipal Power Authority The Oklahoma Municipal Power Authority (OMPA) offers the Demand and Energy Efficiency Program (DEEP) to eligible commercial, industrial, and municipal

207

1992-1993 Bonneville Appliance Efficiency Program: Showerhead Evaluation Volume II - Appendices  

SciTech Connect

This report included the appendices for 1992-1993 Bonneville appliance efficiency program: showerhead evaluation. It consists of nine appendices, titled: Bonneville documents; overview of research projects; Puget Power and Light persistence study; hot-water flow analyses and assumptions documentation; regional end-use metering program; showerhead and faucet aerator performance assessment; Bonneville showerhead program distribution methods by participating utility; water- and energy-saving measure distribution methods literature review; REMP study load shape results.

Warwick, W.M.

1995-01-01T23:59:59.000Z

208

US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Columbia River System Operation Review Canadian Entitlement Allocation Extension Agreements Record of Decision; April 29, 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Columbia River System Operation Review Columbia River System Operation Review Final Environmental Impact Statement Canadian Entitlement Allocation Extension Agreements Record of Decision Summary The Administrator and Chief Executive Officer (CEO) of the Bonneville Power Administration (BPA), acting for BPA, and, as Chairman of the United States Entity (the Administrator and the Division Engineer, North Pacific Division of the United States Army Corps of Engineers), acting on behalf of the United States Entity, has decided to adopt for the Canadian Entitlement Allocation Extension Agreements (CEAEA) a federal hydroelectric projects allocation of 72.5 percent and a non-Federal hydroelectric projects allocation of 27.5 percent. The Columbia River Treaty (Treaty), ratified in 1964, required the construction of three

209

Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Program Oklahoma Municipal Power Authority - Geothermal Heat Pump Rebate Program < Back Eligibility Agricultural Commercial Industrial Residential Maximum Rebate 1,000/ton Program Info Funding Source American Recovery and Reinvestment Act of 2009 State Oklahoma Program Type Utility Rebate Program Rebate Amount $800 - $1,000/ton Provider Oklahoma Municipal Power Authority Program funds currently exhausted, additional funds have been requested. Visit the program website for the most up to date information on fund availability and to register for the waiting list for this program. The Oklahoma Municipal Power Authority (OMPA) and the Oklahoma Department of Commerce currently offer the Oklahoma Comfort Program for geothermal

210

Oklahoma Municipal Power Authority - WISE Energy Efficiency Loan Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Municipal Power Authority - WISE Energy Efficiency Loan Oklahoma Municipal Power Authority - WISE Energy Efficiency Loan Program Oklahoma Municipal Power Authority - WISE Energy Efficiency Loan Program < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Cooling Commercial Heating & Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Water Heating Program Info Funding Source American Recovery and Reinvestment Act of 2009 State Oklahoma Program Type Utility Loan Program Rebate Amount Unsecured Loan: $5,000 - $35,000 Home Equity Loan: $1,000 - $100,000 Provider Oklahoma Municipal Power Authority The Oklahoma Municipal Power Authority (OMPA) offers loans for a variety of

211

Bonneville Power Administration Power Subscription Strategy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Register / Vol. 64, No. 1 / Monday, January 4, 1999 / Notices population models to evaluate anthropogenic effects, population trends, and define a recovering or steady-state population. NMFS-SWR (1190) requests a 5-year scientific research permit to take up to 150 loggerhead, 10 green, 10 hawksbill, 25 leatherback, and 10 olive ridley sea turtles annually in the Pacific Basin for the purpose of determining take rates of sea turtles taken incidental to the Hawaiian longline fishery, and to determine the fate of sea turtles released alive after incidental capture. Trained observers may weigh, measure, flipper tag, satellite tag, tissue sample, blood sample, stomach lavage, and release sea turtles taken incidental to the Hawaiian longline fishery. This is a continuation

212

Long Island Power Authority - Residential Solar Water Heating Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long Island Power Authority - Residential Solar Water Heating Long Island Power Authority - Residential Solar Water Heating Rebate Program Long Island Power Authority - Residential Solar Water Heating Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Solar Water Heating Maximum Rebate $1,500 or 50% of installed cost; $2,000 for systems purchased by 12/31/13 Program Info Funding Source LIPA Efficiency Long Island Program Start Date December 2010 State New York Program Type Utility Rebate Program Rebate Amount $20 per kBTU (based on SRCC collector rating) Bonus Incentive for systems purchased by 12/31/13: 2 Collector system: $500 bonus rebate 1 Collector system: $250 bonus rebate Provider Long Island Power Authority '''''Note: For system purchased by December 31, 2013, LIPA is providing a

213

Long Island Power Authority - Wind Energy Rebate Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long Island Power Authority - Wind Energy Rebate Program Long Island Power Authority - Wind Energy Rebate Program Long Island Power Authority - Wind Energy Rebate Program < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Wind Buying & Making Electricity Maximum Rebate Lesser of 60% of installed cost or values below: Residential: $56,000 Commercial: $135,600 Gov't, School, Non-profit: $200,000 Program Info Funding Source LIPA Efficiency Long Island Program Start Date January 2009 State New York Program Type Utility Rebate Program Rebate Amount Varies by sector and system size Provider Long Island Power Authority '''''Note: The program web site listed above is for the residential wind energy program; however, LIPA also offers

214

SOUTHEASTERN FEDERAL POWER ALLIANCE Municipal Electric Authority of Georgia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOUTHEASTERN FEDERAL POWER ALLIANCE SOUTHEASTERN FEDERAL POWER ALLIANCE Municipal Electric Authority of Georgia 1470 Riveredge Parkway NW, Atlanta, Georgia October 9, 2013 October 8, 2013: Meet in Wyndham Hotel lobby at 6:30 p.m. to travel to Dutch-treat dinner at Copeland's October 9, 2013: Meeting will begin at 8:30 a.m. in the offices of the Municipal Electric Authority of Georgia. *************************************** 1. Welcome, Announcements & MEAG 101 ................................................... Chart Bonham 2. Opening Comments ......................................... BG Ed Jackson, Alan Williford, Ken Legg 3. Washington Update ....................................................................................... Kamau Sadiki 4. American Public Power Association ............................................................. Will Coffman

215

PP-56- Power Authority of the State of New York | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6- Power Authority of the State of New York PP-56- Power Authority of the State of New York Presidential Permit authorizing Power Authority of the State of New York to construct,...

216

PP-25 Power Authority of the State of New York and Long Sault...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Power Authority of the State of New York and Long Sault Inc PP-25 Power Authority of the State of New York and Long Sault Inc Presidential permit authorizing Power Authority of...

217

PP-70 The Power Authority of the State of New York | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 The Power Authority of the State of New York PP-70 The Power Authority of the State of New York Presidential Permit authorizing The Power Authority of the State of New York to...

218

EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

219

Long Island Power Authority - Commercial Energy Efficiency Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long Island Power Authority - Commercial Energy Efficiency Rebate Long Island Power Authority - Commercial Energy Efficiency Rebate Program Long Island Power Authority - Commercial Energy Efficiency Rebate Program < Back Eligibility Commercial Industrial Institutional Nonprofit Schools Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Manufacturing Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Insulation Maximum Rebate Whole Building: $400,000 per building annually ($500,000 for LEED-certified) Commissioning Incentive: Up to 100% of cost, up to $100,000 LEED Certification: Up to $25,000 Energy Modeling: 100% of cost of energy modeling, up to $50,000 Custom and Whole Building Additional Incentive: technical assistance up to

220

Long Island Power Authority Solar Project | Open Energy Information  

Open Energy Info (EERE)

Project Project Jump to: navigation, search Name Long Island Power Authority Solar Project Facility Long Island Power Authority Solar Project Sector Solar Facility Type Roof-mount Owner EnXco Developer EnXco Energy Purchaser Long Island Power Authority Location Long Island, New York Coordinates 40.8168025°, -73.0661493° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8168025,"lon":-73.0661493,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Guam Power Authority Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Guam Power Authority Guam Power Authority Country United States Headquarters Location Hagatna, Guam Recovery Act Funding $16,603,507.00 Total Project Value $33,207,014.00 Coverage Area Coverage Map: Guam Power Authority Smart Grid Project Coordinates 13.4770676°, 144.7494423° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

222

Long Island Power Authority - Renewable Electricity Goal | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Electricity Goal Renewable Electricity Goal Long Island Power Authority - Renewable Electricity Goal < Back Eligibility Municipal Utility Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Renewables Portfolio Standard Provider Long Island Power Authority As a municipal utility, the Long Island Power Authority (LIPA) is not obligated to comply with the [http://www.dsireusa.org/library/includes/incentive2.cfm?Incentive_Code=N... New York Renewable Portfolio Standard (RPS)]. The LIPA Board of Trustees has nevertheless decided to make their own renewable energy commitment mirroring the requirements for New York's investor owned utilities. The initiative is outlined in LIPA's 2004-2013 Energy Plan, approved in June

223

Power and the People  

Science Journals Connector (OSTI)

...Air Act for the electric power industry, are dealt with in a single...find no discussion of the Bonneville Power Administration, and only limited discussion...find no discussion of the Bonneville Power Administration, and only limited discussion...

M. Granger Morgan

1998-04-24T23:59:59.000Z

224

PP-74 The Power Authority of the State of New York | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 The Power Authority of the State of New York PP-74 The Power Authority of the State of New York Presidential Permit The Power Authority of the State of New York to construct,...

225

Long Island Power Authority - Net Metering | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net Metering Net Metering Long Island Power Authority - Net Metering < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Solar Program Info State New York Program Type Net Metering Provider Long Island Power Authority : Note: In October 2012 the LIPA Board of Trustees adopted changes to the utility's net metering tariff that permit remote net metering for non-residential solar and wind energy systems, and farm-based biogas and wind energy systems. It also adopted a measure to increase the aggregate net metering cap for solar, agricultural biogas, residential micro-CHP and

226

New York Power Authority`s energy-efficient refigerator program for the New York City Housing Authority - savings evaluation  

SciTech Connect

The New York Power Authority (NYPA) and the New York City Housing Authority (NYCHA) are replacing refrigerators in New York City public housing with new, highly energy-efficient models over a five-year period. This report describes the analysis of the energy cost savings achieved through the replacement of 20,000 refrigerators in 1996, the first year of the NYPA/NYCHA program. The NYPA/NYCHA project serves as the lynchpin of a larger program designed to offer energy-efficient appliances to housing authorities across the country. The national program is a partnership between the U.S. Department of Energy (DOE) and the Consortium for Energy Efficiency (CEE). Starting with the 1997 refrigerator contract, this program invites other housing authorities to join NYPA in its volume purchase of energy-efficient refrigerators, at the same price and terms available to NYPA. Through these volume purchases, DOE`s ENERGY STAR{reg_sign} Partnerships program hopes to encourage appliance manufacturers to bring more efficient appliances to the market and to provide volume purchasers with the per-unit price savings of a bulk purchaser. DOE asked the Pacific Northwest National Laboratory (PNNL) to establish a protocol for evaluating the savings achieved with the NYPA refrigerators. That protocol is summarized in this report.

Pratt, R.G.; Miller, J.D.

1997-09-01T23:59:59.000Z

227

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1994.html[6/27/2011 11:54:25 AM] Summary-1994.html[6/27/2011 11:54:25 AM] TABLE OF CONTENTS Section Page S.0 SUMMARY S-1 S.1 INTRODUCTION S-1 S.2 PURPOSE OF AND NEED FOR ACTION S-1 S.2.1 Need S-1 S.2.2 Purpose S-4 S.3 BACKGROUND S-4 S.4 ALTERNATIVES INCLUDING THE PROPOSED ACTION S-5 S.4.1 Proposed Action S-5

228

Energy Northwest, Washington Bonneville Power Administration...  

NLE Websites -- All DOE Office Websites (Extended Search)

(84% of sales), to federal agencies, direct service industries and the residential and farm customers of six investor-owned utilities. BPA also operates an extensive transmission...

229

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

to balance variable energy resources. Examples include BPA's funding to develop a demand response market for Northwest commercial and industrial customers, to perform reservoir...

230

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

technologies, data intelligence, next-generation energy efficiency and demand response technologies, and address a host of other gaps. BPA expects to fund 3 million to...

231

Bonneville Power Administration Site Environmental Report, 1991.  

SciTech Connect

In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

United States. Bonneville Power Administration.

1992-06-01T23:59:59.000Z

232

Bonneville Power Administration 1991 site environmental report  

SciTech Connect

In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

Not Available

1992-06-01T23:59:59.000Z

233

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

and grateful. BPA's setting a high bar in terms of gold certification," says Michael Armstrong, the bureau's research and innovation manager. BPA earned gold certification by...

234

Bonneville Power Administration, Oregon Energy Northwest, Washington...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpoors.com Secondary Contact: Jeffrey M...

235

Bonneville Power Administration and the Industrial Technologies...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects program, which works with industries in a traditional fashion to undertake capital improvement projects. Another is the Trade Ally Driven component, which contains...

236

Distribution: Sonya Baskerville, Bonneville Power Administration...  

Energy Savers (EERE)

inspection methods as follows: 1. Visual 2. Non-destructive testing 3. Function measurement 4. Sample testing (e.g., tribology) 2 For more information on conducting a CAS,...

237

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Province). The Upper Columbia Salmon Recovery Board (UCSRB) agreed to serve as this project's proponent Recovery Funding Board (SRFB) and the Mid-Columbia Habitat Conservation Plan Tributary (Trib) funds for Review (BiOp, non-Accord) Dear Messrs. Fritsch and Merrill: Would you please forward this letter

238

Audit Report Management of Bonneville Power Administration's...  

NLE Websites -- All DOE Office Websites (Extended Search)

a significant number of high-risk weaknesses in the areas of access controls, patch management and validation of user input; 2 * Operational security controls designed to...

239

BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE  

NLE Websites -- All DOE Office Websites (Extended Search)

physics, earth science, computer and general science. (Click here to view sample questions.) More than 9,300 high school students and 5,200 middle school students...

240

Microsoft Word - CX-Bonneville-HoodRiverDangerPoleandARFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Civil Engineer - TELF-TPP-3 Proposed Action: Bonneville-Hood River No. 1 Danger Pole Replacement and Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Hood River County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade access roads and landings from Structures 6/1 through 7/4 and replace danger poles on the Bonneville-Hood River No. 1 115-kV transmission line. Background This project entails improving the existing access along the Bonneville-Hood River No. 1 transmission line; maintaining existing structure landings; and replacing three danger poles and associated hardware.

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report  

SciTech Connect

The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

Warwick, W.M.

1995-01-01T23:59:59.000Z

242

Long Island Power Authority - Residential Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Rebate Energy Efficiency Rebate Program Long Island Power Authority - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Sealing Your Home Design & Remodeling Windows, Doors, & Skylights Heat Pumps Commercial Lighting Lighting Water Heating Other Ventilation Construction Maximum Rebate Cool Homes: $1000 Home Performance with Energy Star Program: $1500 Insulation/Duct Insulation: $1500 Air/Duct Sealing: $1500 Program Info State New York Program Type Utility Rebate Program Rebate Amount General Variable-Speed Pool Pumps: $400 Two-Speed Pool Pumps: $150 Refrigerator: $50 - $100 Refrigerator Recycling: $50 rebate plus up to $60 reward

243

Long Island Power Authority Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Long Island Power Authority Country United States Headquarters Location Uniondale, New York Recovery Act Funding $12,496,047.00 Total Project Value $25,293,735.00 Coordinates 40.7003793°, -73.5929056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

244

Long Island Power Authority LIPA | Open Energy Information  

Open Energy Info (EERE)

LIPA LIPA Jump to: navigation, search Name Long Island Power Authority (LIPA) Place Uniondale, New York Zip NY 11553 Product Long Island is a non-profit electric utility company. Coordinates 40.717935°, -73.593544° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.717935,"lon":-73.593544,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

245

Long Island Power Authority - PV Rebate Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PV Rebate Program PV Rebate Program Long Island Power Authority - PV Rebate Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Solar Buying & Making Electricity Maximum Rebate Residential (general customer-owned): Lesser of 50% of installed cost or $18,600; Residential (third-party owned): Lesser of 50% of installed cost or $17,200; Residential (non-profit owned): Lesser of 50% of installed costs or $22,500; Commercial: Lesser of 50% of installed cost or $145,000; Gov't, Schools, Nonprofits: Lesser of 65% of installed cost or $225,000 Program Info Funding Source LIPA Efficiency Long Island Program Start Date 2000 State New York Program Type Utility Rebate Program Rebate Amount

246

Before the Subcommittee on Water and Power- House Natural Resources Committee  

Energy.gov (U.S. Department of Energy (DOE))

Subject: FY 2014 Budget Request for the Bonneville Power Administration By: William K. Drummond, Administrator, BPA

247

Before The Subcommittee on Water and Power- House Committee on Natural Resources  

Energy.gov (U.S. Department of Energy (DOE))

Subject: Proposed Fiscal Year 2015 Budget By: Elliot E. Mainzer, Administrator, Bonneville Power Administration

248

Morphology and paleoclimatic significance of Pleistocene Lake Bonneville spits  

E-Print Network (OSTI)

information about the continental interior of North America. Detailed descriptions of Lake Bonneville featuresMorphology and paleoclimatic significance of Pleistocene Lake Bonneville spits Paul W. Jewell Available online 28 August 2007 Abstract Pleistocene Lake Bonneville of western Utah contains a variety

Johnson, Cari

249

Sixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan  

E-Print Network (OSTI)

are organized by resource areas, Bonneville Power Administration, and Council monitoring activities. In manySixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan Introduction ................................................. 15 Future Role of Bonneville

250

Microsoft Word - CX-NorthBonneville-MidwayInsulatorRep_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEP-Celilo SUBJECT: Environmental Clearance Memorandum Scott Williams Line Foreman III - TFDF-The Dalles Proposed Action: Insulator replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 transmission line PP&A Project No.: 2705 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Skamania County, Washington Line Corridor Structures TRS County, State N. Bonneville - Midway No. 1 1/1 to 10/1 2N, 7E, Sections 3, 7, 9, 16, 39 3N, 7E, Sections 25, 35, 36 3N, 8E, Sections 28, 29, 30 Skamania, Washington Proposed by: BPA Description of the Proposed Action: In order to provide continued system reliability, BPA

251

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

252

IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, VOL. PAS-89, NO. 1, JANUARY 1970 Sparsity-Directed Decomposition for Gaussian  

E-Print Network (OSTI)

20, 1969. The authors are with the Bonneville Power Administration, Portland, Ore. 97208. be quiteIEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, VOL. PAS-89, NO. 1, JANUARY 1970 Sparsity time [1], [2]. Power system network prob- lems involving complex valued matrices of order 2000Ur more

McCalley, James D.

253

A Comparison of Design Criteria, Construction Practices and Cost : Among Bonneville Power Administration, Umatilla Electric Co-op Association, Arizona Public Service Company, Los Angeles Department of Water and Power, Ontario Hydro.  

SciTech Connect

BPA is continually challenged to be cost competitive with other public and private utilities. This report summarizes the results of a survey conducted in 1989 by the Office of Engineering to compare design criteria and practices for constructing transmission and substation facilities with those of other utilities. The objective of the study was to evaluate whether BPA's design criteria and practices result in higher cost for power system facilities with respect to other utilities. The study was initiated by the Assistant Administrator for Engineering as part of overall effort to review BPA's reliability criteria, standards, and related design practices. The survey was jointly conducted by BPA's Division of Facilities Engineering and the Division of Electrical and Electronic Engineering. The evaluation was divided into three major parts which addressed the design and construction of transmission lines, buildings, and substation and control facilities. To conduct the survey, detailed questionnaires were developed to cover a broad spectrum of design criteria, costs, and related subjects, such as environment, land, design, procurement, and construction practices. The questionnaires were sent to participating utilities, followed by visits to the utilities by the BPA survey teams. Of the four utilities participating in the survey, three are larger utilities located outside the Pacific Northwest Region. The utilities were selected because they have transmission voltages similar to BPA, voltages up to 500-kV. The fourth is a smaller BPA customer utility from within the Region selected to provide a BPA customer viewpoint, as well as comparative design information for lower voltage facilities. 6 refs., 43 tabs.

United States. Bonneville Power Administration.

1990-08-03T23:59:59.000Z

254

Bonneville Power Administration's Power Function Review II Final...  

NLE Websites -- All DOE Office Websites (Extended Search)

other planning processes (for example, the Redden Collaborative Process, NOAA Fisheries recovery planning, regional hatchery review, and the Council's Provincial Review Process)....

255

Bonneville Environmental Foundation | Open Energy Information  

Open Energy Info (EERE)

Foundation Foundation Jump to: navigation, search Name Bonneville Environmental Foundation Address 240 SW 1st Avenue Place Portland, Oregon Zip 97204 Region Pacific Northwest Area Website https://www.b-e-f.org/ Coordinates 45.520495°, -122.671887° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.520495,"lon":-122.671887,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

256

Bonneville - Hood River Vegetation Management Environmental Assessment  

SciTech Connect

To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

N /A

1998-08-01T23:59:59.000Z

257

Power Services Site Navigation Menus  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact Information Power Services home page PBL banner with photos of Bonneville dam and wind turbines Power Services Site Navigation Menus Instructions: Click on (or tab to) a...

258

Bonneville Project: CFD of the Spillway Tailrace  

SciTech Connect

US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

2012-11-19T23:59:59.000Z

259

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

260

AUTHORITY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUTHORITY AUTHORITY All Acquisition Letters, remaining in effect, as of March 7, 1996, are listed below. All other Acquisition Letters have either been superseded by formal rulemaking or are otherwise canceled. Financial Assistance Letters are not shown. Please file this listing in your Acquisition Letter binder. AL 96-01 (03/08/96) No. Date Subject 84-1R Rev. 12/92 Acquisition Letters 87-3R Rev. 12/87 Prescreening Policies and Procedures 87-5 09/04/87 Patents and Technical Data 88-1 05/25/88 Rights in Technical Data Facilities 90-3R Rev. 11/30/92 Internal Audit 91-5 08/06/91 Guidance on Implementing DOE Fee Policy 91-7 12/04/91 Rights in Data - Technology Transfer Activities 91-8 10/23/91 Special Considerations Educational Institutions

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

New York Power Authority Uses Decision Analysis to Schedule Refueling of Its Indian Point 3 Nuclear Power Plant  

Science Journals Connector (OSTI)

The New York Power Authority (NYPA) wanted to develop a 10-year schedule for refueling its Indian Point 3 Nuclear Power Plant (IP3) that balanced fish protection, which occurs when IP3 is shut down for refueling, and the costs of buying and loading fuel. ... Keywords: DECISION ANALYSIS--APPLICATIONS, INDUSTRIES--ELECTRIC ENVIRONMENT

Dennis J. Dunning; Steve Lockfort; Quentin E. Ross; Phillip C. Beccue; Jeffrey S. Stonebraker

2001-09-01T23:59:59.000Z

262

Microsoft Word - NEPA_CX_WSDOT_LURR_No_20080504_SALE_North_Bonneville-Ross_ROW.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dawneen Dostert Dawneen Dostert Project Manager - TERR-LMT Proposed Action: Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Vancouver, Clark County, WA, Township 2 North, Range 2 East, Section 28 and 21, Willamette Meridian Proposed by: Bonneville Power Adminitstration (BPA) Description of the Proposed Action: In response to a Land Use Review Request (LURR 20080504), BPA proposes to sell in fee 2.3 acres of land, located in Clark County, Washington, to WSDOT. The land consists of two strips within a residential area, located on either side of

263

Hanford and Stanford: $100 Million Project Approved; The PRDC Case: Private Safety and Public Power  

Science Journals Connector (OSTI)

...power for the federally owned Bonneville Power Administra-tion, as well as plutonium. Bonneville is the Northwest's equivalent of TVA. The Eisenhower Administration, which took a dim view of public power, fa-vored a single-purpose...

1961-06-16T23:59:59.000Z

264

Power System Electrician Construction  

Energy.gov (U.S. Department of Energy (DOE))

Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest states (Washington, Oregon, Montana, Idaho). The...

265

Power System Electrician Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest in Custer, Washington. Custer is a designated...

266

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

267

DOE's Use of Federal Power Act Emergency Authority | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Use of Federal Power Act Emergency Authority DOE's Use of Federal Power Act Emergency Authority DOE's Use of Federal Power Act Emergency Authority Under FPA section 202(c) during the continuance of a war in which the United States is engaged or when an emergency exists by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy, or of facilities for the generation or transmission of electric energy, or of the fuel or water for generating facilities, or other causes, the Secretary of Energy may require by order temporary connections of facilities, and generation, delivery, interchange, or transmission of electricity as the Secretary determines will best meet the emergency and serve the public interest. 16 U.S.C. § 824a(c). On December 14, 2000, a Federal Power Act section 202(c) emergency

268

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2003 29, 2003 To: People Interested in the Project to Mitigate and Restore White Sturgeon Populations in the Columbia and Snake Rivers Bonneville Power Administration (BPA) has prepared the Final Environmental Assessment (EA), which includes a Finding of No Significant Impact (FONSI), for the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The document is enclosed for your information. Background: Since 1986, State, Federal, and Tribal fisheries agencies have been gathering data and studying habitats, movements, population dynamics, feeding, and distribution of white sturgeon in the Columbia River system. With the decline in anadromous salmonid runs there has been an increase in the importance of the white sturgeon fisheries. The Oregon Department of

269

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

SciTech Connect

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-03-01T23:59:59.000Z

270

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

SciTech Connect

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-07T23:59:59.000Z

271

Before the House Subcommittee on Water and Power | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Gregory K. Delwiche, Senior Vice President of Power Services Bonneville Power Administration Before The Subcommittee on Water And Power Committee on Natural Resources, U.S....

272

Long Island Power Authority - Solar Initiative Feed-in Tariff (New York) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Initiative Feed-in Tariff (New Solar Initiative Feed-in Tariff (New York) Long Island Power Authority - Solar Initiative Feed-in Tariff (New York) < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Schools State Government Savings Category Solar Buying & Making Electricity Program Info Start Date 07/16/2012 Expiration Date 01/31/2014 State New York Program Type Performance-Based Incentive Rebate Amount Determined through the Clearing Price Auction Provider Long Island Power Authority The Long Island Power Authority's (LIPA) Feed-in Tariff II (FIT II) program provides fixed payments for electricity produced by approved photovoltaic systems over a fixed period of time. The program operates under a sell-all arrangement, where the full amount of energy production from the facility

273

New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report  

SciTech Connect

Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

Kinney, L.F.; Lewis, G. [Synertech Systems Corp., Syracuse, NY (United States); Pratt, R.G.; Miller, J. [Pacific Northwest National Lab., Richland, WA (United States)

1997-08-01T23:59:59.000Z

274

Author's personal copy Power spectral analysis of Jupiter's clouds and kinetic energy from Cassini  

E-Print Network (OSTI)

full-longitudinal maps of wind vectors and atmospheric kinetic energy within Jupiter's troposphere. WeAuthor's personal copy Power spectral analysis of Jupiter's clouds and kinetic energy from Cassini 85721, USA a r t i c l e i n f o Article history: Received 16 December 2010 Revised 8 September 2011

Choi, David S.

275

The New York Power Authority`s energy-efficient refrigerator program for the New York City Housing Authority -- 1997 savings evaluation  

SciTech Connect

This document describes the estimation of the annual energy savings achieved from the replacement of 20,000 refrigerators in New York City Housing Authority (NYCHA) public housing with new, highly energy-efficient models in 1997. The US Department of Housing and Urban Development (HUD) pays NYCHA`s electricity bills, and agreed to reimburse NYCHA for the cost of the refrigerator installations. Energy savings over the lifetime of the refrigerators accrue to HUD. Savings were demonstrated by a metering project and are the subject of the analysis reported here. The New York Power Authority (NYPA) identified the refrigerator with the lowest life-cycle cost, including energy consumption over its expected lifetime, through a request for proposals (RFP) issued to manufacturers for a bulk purchase of 20,000 units in 1997. The procurement was won by Maytag with a 15-ft{sup 3} top-freezer automatic-defrost refrigerator rated at 437 kilowatt-hours/year (kWh/yr). NYCHA then contracted with NYPA to purchase, finance, and install the new refrigerators, and demanufacture and recycle materials from the replaced units. The US Department of Energy (DOE) helped develop and plan the project through the ENERGY STAR{reg_sign} Partnerships program conducted by its Pacific Northwest National Laboratory (PNNL). PNNL designed the metering protocol and occupant survey used in 1997, supplied and calibrated the metering equipment, and managed and analyzed the data collected by NYPA. The objective of the 1997 metering study was to achieve a general understanding of savings as a function of refrigerator label ratings, occupant effects, indoor and compartment temperatures, and characteristics (such as size, defrost features, and vintage). The data collected in 1997 was used to construct models of refrigerator energy consumption as a function of key refrigerator and occupant characteristics.

Pratt, R.G.; Miller, J.D.

1998-09-01T23:59:59.000Z

276

POST-CONSTRUCTION WILDLIFE MONITORING AT THE ATLANTIC CITY UTILITIES AUTHORITY-JERSEY ATLANTIC WIND POWER FACILITY  

E-Print Network (OSTI)

WIND POWER FACILITY PROJECT STATUS REPORT IV Submitted to: New Jersey Board of Public Utilities New Authority (ACUA) wind power facility. The period covered by this report is 1 January to 31 August 2009

Firestone, Jeremy

277

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SAMPLE IMPLEMENTATION ACTIONS, RESEARCH MONITORING AND EVALUATION, AND POLICY AND PLANNING Fish and Wildlife Implementation Plan EIS Volume 3: Sample Implementation Actions, Research Monitoring and Evaluation, and Policy and Planning Volume 3/ 1 VOLUME 3 SAMPLE IMPLEMENTATION ACTIONS, RESEARCH MONITORING AND EVALUATION, AND POLICY AND PLANNING One of the major challenges within the Region has been understanding the interrelationships among the numerous proposed fish and wildlife mitigation and recovery actions. One reason for this difficulty is that these actions are derived from many different regional proposals, each of which has been designed to meet a specific goal. In addition, the lack of an effective tool to illustrate these interrelationships has hampered understanding.

278

Bonneville Power Administration Nez Perce Tribal Hatchery Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 17 Federal Register / Vol. 62, No. 203 / Tuesday, October 21, 1997 / Notices all comments received within 60 days of the date of publication of this notice. FOR FURTHER INFORMATION CONTACT: To request more information on this proposed information collection or to obtain a copy of the proposal and associated collection instruments, please write the above address, or call Department of the Army Reports clearance officer at (703) 614-0454. Title: Research to Develop a Profile of Army National Guard Members. Needs and Uses: This research will be a mail survey among Army National Guard members. The research will assist the Army National Guard (ARNG) in making the most effective use of its public relations, advertising and marketing budget for recruiting efforts. The research will help the ARNG and its

279

Bonneville Power Administration/Lower Valley Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

853 853 Federal Register / Vol. 63, No. 162 / Friday, August 21, 1998 / Notices Radiological Impacts-Total radiological releases would be significantly lower than either the U.S. Environmental Protection Agency (EPA) limit or past annual releases from LANL. The resulting maximum concentrations for radionuclides measured at the location of the MEI for the demonstration is estimated to be less than two percent of the EPA limit. Radiological impacts associated with the proposed action could increase LANL total site impacts by a small percentage (1.0 percent for the MEI, 1.3 percent for the surrounding population, and 1.3 percent for the average individual). Under the proposed action, the estimated annual average dose to pit disassembly workers would be 750 mrem. The annual dose received by the

280

STATEMENT OF ELLIOT MAINZER ACTING ADMINISTRATOR BONNEVILLE POWER...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

generate hydropower. The U.S. Entity also uses the flexibilities within the Treaty to work with our Canadian counterparts to implement operations designed specifically to benefit...

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

United States Government Department of Energy Bonneville Power...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the PUD to upgrade its communications equipment by installing a fiber network. At each substation, BPA would install new fiber optic cable from an existing equipment cabinet in...

282

The Bonneville Power Administration is proposing to build a 500...  

NLE Websites -- All DOE Office Websites (Extended Search)

79 miles long, running between a new substation near Castle Rock, Wash., and a new substation near Troutdale, Ore. In November 2012, BPA completed a draft environmental...

283

Wind Power Excites Utility Interest  

Science Journals Connector (OSTI)

...rated at 200 kilowatts peak power output in Clayton, N.M...megawatts (2000 kilowatts) peak power output, is undergoing initial...output fed into the grid of the Bonneville Power Administration. Boeing estimates its machine...

R. JEFFREY SMITH

1980-02-15T23:59:59.000Z

284

NEP.o. DETEmIINATION RECIPIENT:Oklahoma Municipal Power Authority  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

... ~ . u.s DEPARTMENT OFENERG. EERE PROJECT :VI ANAGE:VIENT ('EN rER NEP.o. DETEmIINATION RECIPIENT:Oklahoma Municipal Power Authority PROJECT TITLE: OKLAHOMA SEP ARRA - OMPA Large System Rebate Request I Page 1 orz STATE: OK Funtling Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO52 OE-EEOOOO133 GFO-OOO0133-024 0 Based on my review of the Information concerning: the proposed action, as N.:PA Compliance Officer (authorized under DO.; Order 45I.1A), 1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Des.:ription: 85.1 Actions to conserve energy, demonstrate potential energy conservation. and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

285

"1. Robert Moses Niagara","Hydroelectric","New York Power Authority",2353  

U.S. Energy Information Administration (EIA) Indexed Site

York" York" "1. Robert Moses Niagara","Hydroelectric","New York Power Authority",2353 "2. Ravenswood","Gas","TC Ravenswood LLC",2330 "3. Nine Mile Point Nuclear Station","Nuclear","Nine Mile Point Nuclear Sta LLC",1773 "4. Oswego Harbor Power","Petroleum","NRG Oswego Harbor Power Operations Inc",1648 "5. Northport","Gas","National Grid Generation LLC",1569 "6. Astoria Generating Station","Gas","U S Power Generating Company LLC",1315 "7. Roseton Generating Station","Gas","Dynegy Northeast Gen Inc",1212 "8. Blenheim Gilboa","Pumped Storage","New York Power Authority",1160

286

Bonneville County, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bonneville County, Idaho: Energy Resources Bonneville County, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.4508683°, -111.5455289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.4508683,"lon":-111.5455289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

287

Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004  

SciTech Connect

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

2005-12-22T23:59:59.000Z

288

Power Authority of the State of New York Smart Grid Demonstration Project |  

Open Energy Info (EERE)

of the State of New York Smart Grid Demonstration Project of the State of New York Smart Grid Demonstration Project Jump to: navigation, search Project Lead Power Authority of the State of New York Country United States Headquarters Location White Plains, New York Recovery Act Funding $720,000.00 Total Project Value $1,440,000.00 Coordinates 41.0339862°, -73.7629097° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

289

EIS-0131: Initial Northwest Power Act Power Sales Contracts  

Energy.gov (U.S. Department of Energy (DOE))

The Bonneville Power Administration prepared this EIS to analyze the environmental impact of power sales and residential exchange contracts and to explore if there is a need to seek changes to these contracts.

290

Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005  

SciTech Connect

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

2006-12-04T23:59:59.000Z

291

Power System Electrician Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest in The Dalles. Oregon. The Dalles is the county...

292

Power System Electrician Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest in Lewiston, Idaho. Lewiston is a city in north...

293

Power System Electrician Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest near Vancouver, Washington. Vancouver is a city on...

294

Power System Electrician Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Join the Bonneville Power Administration (BPA) for a challenging and rewarding career, while working, living, and playing in the Pacific Northwest near Kent, Washington, a city located in King...

295

Washington's power supply collapse  

Science Journals Connector (OSTI)

... ON 25 July 1983 the Washington Public Power Supply System (WPPSS) defaulted on 2,250 million of municipal revenue bonds. This, ... has been polemical and accusatory in nature, blaming the Washington State Supreme Court, the Bonneville ...

Roger H. Bezdek

1985-09-26T23:59:59.000Z

296

Wind power on BPA system sets another new record  

NLE Websites -- All DOE Office Websites (Extended Search)

another new record The renewable resource passes 4,000 megawatts Portland, Ore. - Wind turbines in the Bonneville Power Administration's transmission grid generated over 4,000...

297

Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.  

SciTech Connect

From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emergence timing estimates and evaluations of redd dewatering.

Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju [Pacific Northwest National Laboratory

2008-08-08T23:59:59.000Z

298

Environmental Assessment for Authorizing the Puerto Rico Electric Power Authority (PREPA) to allow Public Access to the Boiling Nuclear Superheat (BONUS) Reactor Building, Ricon, Puerto Rico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

394: Public Access to the BONUS Facility January 2003 394: Public Access to the BONUS Facility January 2003 i DOE/EA-1394 ENVIRONMENTAL ASSESSMENT FOR AUTHORIZING THE PUERTO RICO ELECTRIC POWER AUTHORITY (PREPA) TO ALLOW PUBLIC ACCESS TO THE BOILING NUCLEAR SUPERHEAT (BONUS) REACTOR BUILDING, RINCÓN, PUERTO RICO January 2003 U.S. Department of Energy Oak Ridge Operations Office Oak Ridge, Tennessee DOE/EA-1394: Public Access to the BONUS Facility January 2003 ii TABLE OF CONTENTS LIST OF FIGURES V LIST OF TABLES V ACRONYMS VI UNIT ABBREVIATIONS VII SUMMARY VIII 1. INTRODUCTION 10 1.1 Purpose and Need for Action 10 1.2 Operational and Decommissioning History 15 1.3 Summary of Radiological Conditions at the BONUS Facility 19 2. DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES 25

299

Independent Scientific Review Panel for the Northwest Power and Conservation Council  

E-Print Network (OSTI)

by the Bonneville Power Administration (Bonneville). The Independent Scientific Review Panel (ISRP) and peer reviewIndependent Scientific Review Panel for the Northwest Power and Conservation Council 851 SW 6 th to the Northwest Power Act directed the Northwest Power and Conservation Council (Council) to appoint an 11-member

300

DRAFT Lower Columbia Salmon and Steelhead Recovery and Subbasin Plan BONNEVILLE TRIBUTARIES II, 16-1 May 2004  

E-Print Network (OSTI)

#12;DRAFT Lower Columbia Salmon and Steelhead Recovery and Subbasin Plan BONNEVILLE TRIBUTARIES II, 16-2 transport processes. Lower Hamilton Creek, which is affected by development in North BonnevilleDRAFT Lower Columbia Salmon and Steelhead Recovery and Subbasin Plan BONNEVILLE TRIBUTARIES II, 16

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Microsoft PowerPoint - How To Do Business with DOE Albuquerque...  

Office of Environmental Management (EM)

Federal water projects in order to repay the Government's investment in the projects. 1. BPA - Bonneville Power Administration - headquartered in Portland, Oregon 2. SEPA -...

302

Western Area Power Administration's Control and Administration of American Recovery and Reinvestment Act Borrowing Authority, OAS-RA-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Alert Management Alert Western Area Power Administration's Control and Administration of American Recovery and Reinvestment Act Borrowing Authority OAS-RA-12-01 November 2011 Department of Energy Washington, DC 20585 November 4, 2011 MEMORANDUM FOR THE ADMINISTRATOR, WESTERN AREA POWER ADMINISTRATION FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Management Alert on "The Western Area Power Administration's Control and Administration of American Recovery and Reinvestment Act Borrowing Authority" IMMEDIATE CONCERN Despite internal control and administration issues with its first project authorized under its $3.25 billion American Recovery and Reinvestment Act of 2009 (Recovery Act) borrowing authority, the Department of Energy's (Department) Western Area Power Administration

303

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

304

Bonneville Power Administration Notice of Availability of Record of Decision for the Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74 74 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices to speak to the Committee, on a first come, first serve basis. Those who call in and reserve time will be given the opportunity to speak first. The Chairman is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Transcripts and Minutes: Meeting minutes will be available for public review and copying at the Freedom of Information Public Reading Room, 1E-190, Forrestal Building, 1000 Independence Avenue, S.W., Washington, DC 20585 between 9:00 a.m. and 4:00 p.m., Monday through Friday, except Federal holidays. Issued at Washington, DC on October 5, 1995. Rachel M. Samuel, Acting Deputy Advisory Committee Management Officer. [FR Doc. 95-25215 Filed 10-11-95; 8:45 am]

305

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

306

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

307

EERE PROJECT MANAGEMENT CENTER NEPA DI!TI!RlloITNATION RECIPIE:NT:OKlahoma Municipal Power Authority  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFI!NFRGY OFI!NFRGY EERE PROJECT MANAGEMENT CENTER NEPA DI!TI!RlloITNATION RECIPIE:NT:OKlahoma Municipal Power Authority PROJECf TITLE: OKLAHOMA SEP ARRA - OMPA Large Systems Request W Page 1 of2 STATE: OK Funding Opportunity Announcement Number Procurement Instrument NumMr NEPA Control Number CID Number DE-FOA'()()()()()S2 DE-EEOOOO133 GF0-0000133-049 0 Based on my review or the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description : B5.19 Ground source heat pumps The installation, modification, operation. and removal of commercially available smaliscale ground source heat pumps to support operations in Single facilities (such as a school or community center) or contiguous facilities (such as an office

308

The Bonneville Flood Debris Field as Sacred Landscape  

E-Print Network (OSTI)

Area for the CJ Strike Hydroelectric Plant, Idaho PowerWithin the Proposed Dike Hydroelectric Project Impact Area.

Pavesic, Max G

2007-01-01T23:59:59.000Z

309

inverter. He is the author or co-author of more than 300 publica-tions in his research fields including the book `Control in Power  

E-Print Network (OSTI)

W, the induction generator is favored for small hydro and wind power plants. More recently, with the widespread use Power Electronics Society NEWSLETTER 19 Induction Generators for Small Wind Energy Systems M. Godoy solution for such applications [1]. For its simplicity, robustness, and small size per generated k

Simões, Marcelo Godoy

310

Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.  

SciTech Connect

In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific riverbed elevation and providing minimum spawning flows that have the greatest chance of being maintained through egg incubation and fry emergence. However, managing the lower Columbia River for a stable tailwater elevation does not provide much operational flexibility at Bonneville Dam, which has little storage capacity. When river discharges increase due to rain events, the traditional approach has been to pass excess water at night to maintain stable tailwater elevations during the daytime. The underlying assumption of this strategy, referred to as reverse load following, is that fish do not spawn at night. However, Tiffan et al. (2005) showed that this assumption is false by documenting nighttime spawning by chum salmon in the Ives Island area. Similarly, McMichael et al. (2005) reported nighttime spawning by Chinook salmon (O. tshawytscha) in the Columbia River, indicating that diel spawning may be a common occurrence in Pacific salmon. During the latter portion of the chum spawning period in December 2003 and 2004, discharges from Bonneville Dam increased from an average of 3,398 m3/s (tailwater elevation {approx} 3.5 m above mean sea level) during the day to over 5,664 m3/s (tailwater elevation {approx} 5.1 m) at night, with peak discharges of 7,080 m{sup 3}/s (tailwater elevation {approx} 6.1 m). This caused concern among fishery managers regarding the potential effects of these high discharges on this population of spawning chum salmon, which is listed under the Endangered Species Act (National Oceanic and Atmospheric Administration 1999). We hypothesized that increased water velocities associated with elevated tailwaters might alter chum salmon spawning behavior if water velocities at redd locations increased beyond the range of suitability (>0.8 m/s; Salo 1991). In 2005, we investigated the movement and behavioral responses of spawning chum salmon at Ives Island to increased tailwater elevations at Bonneville Dam. We used acoustic telemetry to determine if the higher velocities associated with increased tailwater elevations caused fish to leave their re

Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

2008-12-01T23:59:59.000Z

311

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.  

SciTech Connect

This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

312

Recommendations for Amendments--Mainstem Columbia/Snake Rivers Elements of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program  

E-Print Network (OSTI)

Service under the ESA have been superceded by one year of drought conditions and Bonneville Power Administration's declaration of a "revenue emergency." #12;2 The Council acts as if it and the Northwest Power to operate the FCRPS to maximize energy revenue so Bonneville can pay its nuclear power plant gambling debts

313

Cost-Effectiveness: Implication for Bonneville and Utility Programs Council document 2007-23 August 2007  

E-Print Network (OSTI)

1 Cost-Effectiveness: Implication for Bonneville and Utility Programs Council document 2007 found to be cost effective if the electric system paid all the costs. Council plan conservation targets are based on availability of conservation that passes this Total Resource Cost (TRC) test. Since its first

314

Cost-Effectiveness -Implication for Bonneville and Utility Programs The Council's 5th  

E-Print Network (OSTI)

1 Cost-Effectiveness - Implication for Bonneville and Utility Programs Background The Council's 5th Plan conservation targets are comprised of measures that were found to be cost effective if the electric system paid all the costs. Council plan conservation targets are based on availability

315

Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008  

SciTech Connect

Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

2010-02-12T23:59:59.000Z

316

Microsoft Word - FarmPowerMistyMeadows_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 0, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of the Farm Power Misty Meadows Generating Facility Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electric equipment Location: Tillamook County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Farm Power Misty Meadow's (Farm Power's) small generator interconnection request, BPA is planning to integrate their 1-MW biomass generation project into its balancing authority (BA). The proposed point of interconnection is Tillamook PUD's Feeder Circuit #63, which is connected to the Tillamook PUD's Wilson River Substation. In order to integrate the

317

PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement file:///I|/Data%20Migration%20Task/EIS-0171-FEIS-Summary-1994.htm[6/27/2011 10:42:49 AM] Summary PacifiCorp Capacity Sale Final Environmental Impact Statement (EIS) Purpose of and Need for the Action The Bonneville Power Administration (BPA) must respond to the need for power as represented by PacifiCorp's request for a continued supply of firm capacity. BPA has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of firm power customers, pursuant to the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), and previously committed capacity contracts. BPA is authorized under the Northwest Power Act to sell system capacity and/or energy that is surplus to its needs,

318

HEADLINE: BPA RAISES RATES TO BOLSTER FEDERAL POWER AND TRANSMISSION...  

NLE Websites -- All DOE Office Websites (Extended Search)

6 13 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, July 24, 2013 CONTACT: Teresa Waugh, 503-230-7536 Doug Johnson, 503-230-5840 or 503-230-5131 BPA adopts new...

319

Lakeview Light and Power - Energy Smart Grocer Rebate Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lakeview Light and Power - Energy Smart Grocer Rebate Program Lakeview Light and Power - Energy Smart Grocer Rebate Program Lakeview Light and Power - Energy Smart Grocer Rebate Program < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Appliances & Electronics Commercial Lighting Lighting Other Program Info Funding Source Lakeview Light and Power and Bonneville Power Administration State District of Columbia Program Type Utility Rebate Program Rebate Amount Varies by technology Provider Lakeview Light and Power Lakeview Light and Power, in association with the Bonneville Power Administration, offers the Energy Smart Program through which grocery

320

Bonneville Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal  

Open Energy Info (EERE)

Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bonneville Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Facility Facility Bonneville Seabase Scuba Dive Pool Sector Geothermal energy Type Pool and Spa Location Grantsville, Utah Coordinates 40.5999425°, -112.4643988° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Overview of the Performance of PIT-Tag Interrogation Systems for Adult Salmonids at Bonneville and McNary Dams, 2002.  

SciTech Connect

During winter 2001, the U.S. Army Corps of Engineers (Corps) and Bonneville Power Administration (BPA) installed a prototype orifice-based PIT-tag interrogation system into the Washington Shore Ladder at Bonneville Dam (BWSL). Detectors were installed into 12 weirs: 4 downstream (Weirs 334-337) and 8 upstream (Weirs 352-359) from the fish release point (i.e., the exit ladder for the Adult Fish Facility). NOAA Fisheries (National Marine Fisheries Service--NMFS) tagged and released salmonids during 2001 to determine tag-reading efficiencies for different salmonid populations. Data analyses focused on the upper eight weirs. The 2001 tagging results for spring chinook salmon indicated that having detectors in four consecutive weirs would have been sufficient to yield a reading efficiency of 95%. The BWSL orifice-based system performed well until the coho and fall chinook salmon migrations began. Coho and fall chinook salmon appeared to use the weir overflows, and thus avoid detection, at much higher rates than biologists expected. During 2001, technology advances led to the development of significantly larger antennas than had been available earlier, and thus it was possible to build antennas of approximately 2 x 6 ft. Consequently, it became feasible to design interrogation systems for ladder locations where all fish would have to go through the antennas and thus could not avoid detection by using the weir overflows (Fig. 1). Destron Technologies by Digital Angel designed a prototype interrogation system with two antennas that was installed into the counting-window area in the Oregon Ladder at McNary Dam, where its performance could then be directly compared to that of the orifice-based system in the same ladder. Although the orifice-based systems appeared less effective than the fisheries community wanted for fall chinook and coho salmon, the decision was made to proceed with installations planned for Bonneville and McNary Dams because valuable data would still be collected. During the winter of 2002, the Corps and BPA installed PIT-tag interrogation systems into the Bradford Island and Cascades Island Fish Ladders at Bonneville Dam and into the Washington and Oregon Ladders at McNary Dam. Like BWSL in 2001, these ladders had eight weirs (16 orifices) outfitted with fiberglass antennas. Douglas County Public Utility District also installed an orifice-based system into its ladders at Wells Dam, but they were able to use weirs with no overflow sections wherein all fish had to swim through the orifice antennas. Thus, 2002 was the first year that the fisheries community had PIT-tag detection of adult salmonids at Bonneville, McNary, Wells, and Lower Granite Dams (Fig. 2). This overview will provide information on how well the systems at Bonneville and McNary Dams performed.

Downing, Sandra L.; Prentice, Earl F.

2003-06-01T23:59:59.000Z

322

Microsoft Word - PSRP Updates 6-25-10_v2 | Department of Energy  

Energy Savers (EERE)

Western Area Power Administration Borrowing Authority, Recovery Act WAPA Recovery Act Implementation Appropriation Bonneville Power Administration Program Specific Recovery Plan...

323

Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam  

SciTech Connect

At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.

Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

2007-01-30T23:59:59.000Z

324

House Rejects Southern Idaho Power Line  

Science Journals Connector (OSTI)

The House of Representatives has refused to go along with the Bonneville Power Administration's plans to build a power transmission line into southern Idaho, where Monsanto hopes to use part of the power in a planned expansion of its elemental phosphorus ...

1964-06-22T23:59:59.000Z

325

Bonneville Power Administration and the Creation of the Pacific Intertie, 1958 -1964.  

E-Print Network (OSTI)

?? Construction of the Pacific Northwest-Pacific Southwest Intertie (also known as the Pacific Intertie) began in 1964, following the culmination of a series of interrelated (more)

Binus, Joshua D.

2008-01-01T23:59:59.000Z

326

Distribution of Extreme Winds in the Bonneville Power Administration Service Area  

Science Journals Connector (OSTI)

Annual extreme 1 min wind speeds at 78 Pacific Northwest locations were analyzed using the Fisher-Tippet type II extreme value function. From computed mean recurrence intervals, we could easily determine the wind speed likely to recur in a ...

J. William Wantz; Robert E. Sinclair

1981-12-01T23:59:59.000Z

327

Bonneville Power Administration, Lower Columbia Region: Noxious Weed Management, 1996 Annual Report.  

SciTech Connect

During the 1996 season ODA executed the contract between BPA and ODA. Execution of this contract included the following activities: Survey for target noxious weeds, such as Gorse; collection and redistribution of biological control agents, for example, Apion seed weevils for Scotch broom, bioagents for diffuse and spotted knapweed, Gorse spider mite, and gall fly releases for control of Canada thistle and bull thistle; and control of isolated infestations of Gorse on BPA rights-of-way. Training was provided for line crews at the Chemawa, Alevy and North Bend districts. The purpose of the program is to assist BPA in the integrated prevention and control of noxious weed species on BPA transmission line maintenance right-of-ways.

United States. Bonneville Power Administration, Portland, OR; Oregon Department of Agriculture Noxious Weed Control Program

1996-01-01T23:59:59.000Z

328

EIS-0312: Notice of Availability of the Bonneville Power Administration Administrator's Record of Decision  

Energy.gov (U.S. Department of Energy (DOE))

Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish Accords

329

Bonneville Power Administration Fish and Wildlife Implementation Plan, October 23, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488 488 Federal Register / Vol. 64, No. 202 / Wednesday, October 20, 1999 / Notices DEPARTMENT OF COMMERCE Patent and Trademark Office Performance Review Board AGENCY: Patent and Trademark Office, Commerce. ACTION: Announcement of membership of the Patent and Trademark Office Performance Review Board. SUMMARY: In conformance with the Civil Service Reform Act of 1978, 5 U.S.C. 4314(c)(4), the Patent and Trademark Office announces the appointment of persons to serve as members of its Performance Review Board. ADDRESSES: Comments should be addressed to Director, Office of Human Resources, Patent and Trademark Office, One Crystal Park, Suite 707, Washington, DC 20231. FOR FURTHER INFORMATION CONTACT: Alethea Long-Green at the above address or telephone (703) 305-8062. SUPPLEMENTARY

330

Alzheimer's disease: a disorder of cortical cholinergic innervation  

Science Journals Connector (OSTI)

...program for the elec-tric power industry. EPRI selects and...systems-Tennessee Valley Authority and the Bonneville Power Administration. About 150 non-member utilities...Tennessee Valley Au-thority and Bonneville Power Adminis-tration, no...

JT Coyle; DL Price; MR DeLong

1983-03-11T23:59:59.000Z

331

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

332

Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System  

SciTech Connect

In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines and neutrally-buoyant particles) the lower numbered turbine units.

Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.

2010-02-01T23:59:59.000Z

333

Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007  

SciTech Connect

The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

2008-12-01T23:59:59.000Z

334

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008  

SciTech Connect

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

2009-12-28T23:59:59.000Z

335

Export Authorizations  

Energy.gov (U.S. Department of Energy (DOE))

Below is a listing of export authorizations grouped by Canada and Mexico.Export Authorizations - CanadaExport Authorizations - Mexico

336

Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

2011-03-01T23:59:59.000Z

337

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

2012-09-01T23:59:59.000Z

338

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

2011-12-01T23:59:59.000Z

339

Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam  

SciTech Connect

At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

2009-01-29T23:59:59.000Z

340

(DOE/EIS-0285/SA-63): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanford-Ostrander 4/22/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2002 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanvor-Ostrander (DOE/EIS-0285/SA-63) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the North Bonneville-Midway and Hanford- Ostrander transmission line right-of-way (approx. 702 acres). The project area begins at the North Bonneville Substation and terminates at structure 25/3+500. For most of the length of the right-of-way, the width is 300 feet wide on the North Bonneville-Midway Line and 150 feet wide for the Hanford- Ostrander Line. Location: The ROW is located in North Bonneville, Skamania County, OR, being in the

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

342

Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse  

SciTech Connect

Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

2011-11-22T23:59:59.000Z

343

Legal Authorities  

Energy.gov (U.S. Department of Energy (DOE))

Federal agencies are required to meet energy management mandates outlined by the following Federal legal authorities.

344

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network (OSTI)

of the Bonneville Power Administration. PROPOSED ACTION: Finalize the draft report and submit to the Governors been affected by hydroelectric development. The Power Act requires the Bonneville Power Administration to fund the Council's fish and wildlife program. Bonneville is a federal power marketing authority within

345

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011  

SciTech Connect

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-06-04T23:59:59.000Z

346

Anderson Testimony to Water Power Subcommittee, Lewiston Idaho, May 31 1997 Page 1 Testimony of  

E-Print Network (OSTI)

of reservoir drawdown through funding from the Bonneville Power Administration and the Army Corps of EngineersAnderson Testimony to Water Power Subcommittee, Lewiston Idaho, May 31 1997 Page 1 Testimony before the U.S. House of Representatives Subcommittee on Water and Power in Lewiston Idaho May 31, 1997

Washington at Seattle, University of

347

Prepping Power Engineers for the Smart Grid | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prepping Power Engineers for the Smart Grid Prepping Power Engineers for the Smart Grid Prepping Power Engineers for the Smart Grid June 19, 2012 - 4:01pm Addthis This video examines electrostatic induction, a phenomenon that means a conductive object in the vicinity of a power line may have energy coupled to it even if it's not connected to the line. Check out the other videos created by the partnership Bonneville Power Administration, Washington State University and the Northwest Workforce Training Center for Electric Power Engineering on their Smart Grid YouTube playlist. Joel Scruggs Public Affairs Specialist, Bonneville Power Administration BPA's High Voltage Lab: Ever wonder why electricity makes power lines sag? This video explains why. Check out the Smart Grid Workforce playlist for other videos from

348

Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay  

SciTech Connect

In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers showed reduced the maximum velocities (in spite of the increased the flow into the gatewell), and decreased the area of recirculation. The area near the VBS exceeding the normal velocity criteria of 1 ft/s was reduced and the flows were more balanced.

Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

2012-07-01T23:59:59.000Z

349

Authorization Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Authorization Policy Authorization Policy Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) OSCARS Case Study Documentation User Manual FAQ Design Specifications Functional Specifications Notifications Publications Authorization Policy Default Attributes Message Security Clients For Developers Interfaces Links Hardware Requirements DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Authorization Policy Introduction An authorization decision consists of deciding if an authenticated entity

350

December 6, 2012 2013 Geographic Project Review  

E-Print Network (OSTI)

and Conservation Council (Council) and Bonneville Power Administration (Bonneville) announce the start. Section 4(h)(10)(A) of the Power Act then calls on the Bonneville to use its funds and other authorities areas of the Columbia Basin for Fiscal Years 2014-2018 Dear Project Sponsors: The Northwest Power

351

Export Authorizations - Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

352

DOE/EIS-0312; Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft EIS (5/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Columbia River Basin Columbia River Basin BPA Service Area NZ20027a April 02, 2001 Columbia River Basin BPA Service Area than 10 micrometers ) Maintenance Moderate Serious Maintenance Moderate Serious Maintenance Federal Class I Area Coal Oil Gas Biomass* Nuclear Municipal Solid Waste Black Liquor Raw Sulfur Biogas / Methane Multiple types Solar Wind Gas Solar Wind Geothermal * Some biomass can be considered renewable. * Locations of proposed plants are approximate and not intended represent legal or claimed locations. NZ20027b April 03, 2001 Columbia River Basin BPA Service Area Flow Limited Temperature Limited Flow and Temperature Limited NZ20027j April 03, 2001 Columbia River Basin BPA Service Area Anadromous Fish Extinct Listed Anadromous Fish Species Listed Resident Fish - Bull Trout

353

Bonneville Power Administration Notice of Availability of Record of Decision for Firm Non-Requirements Products and Services Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

563 563 Federal Register / Vol. 60, No. 211 / Wednesday, November 1, 1995 / Notices physical equipment, fiscal affairs, and academic methods of the Naval Academy. During the executive session these inquiries will relate to the internal personnel rules and practices of the Academy, may involve on-going criminal investigations, and include discussions of personal information the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Accordingly, the Secretary of the Navy has determined in writing that the executive session portion of the meeting shall be closed to the public because it will be concerned with matters as outlined in section 552b(c) (2), (5), (6), (7) and (9) of Title 5, United States Code. For further information concerning this meeting contact: Lieutenant

354

Bonneville Power Administration is investigating wide-area stability and voltage control. The control provides a flexible  

E-Print Network (OSTI)

. There will also be synergy between wide-area control and substation automation (e.g., intelligent electronic Adminis- tration (BPA). For the past decade, wintertime voltage stability has been a major concern [1

Venkatasubramanian, Mani V.

355

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

strategy, developed by Honeywell, Inc. , is describeda separate report. [Honeywell, 1986]. Ref erences ASHRAE (Atlanta, pp. 422-452. Honeywell (1986). "Indoor Air

Grimsrud, David T.

2009-01-01T23:59:59.000Z

356

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

Nitrogen dioxide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .in each house. Nitrogen dioxide concentrations in each housesampler Formaldehyde, nitrogen dioxide and water vapor

Grimsrud, David T.

2009-01-01T23:59:59.000Z

357

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

Air Quality Measure in the BPA Weatherization Program",teMperatures for any period. BPA-IAQ Project AND 127 +32*(meet electric load obligations. (BPA) to undertake energy

Grimsrud, David T.

2009-01-01T23:59:59.000Z

358

PROJECT HIGHLIGHTS In the first project of its kind, the Bonneville Power Administration teamed with the Pacific Northwest  

E-Print Network (OSTI)

the technical and economic feasibility of developing compressed air energy storage (CAES) in the unique geologic and development, and project management to the operator's specific needs and business case. Compressed Air Energy,high-capacityporousrockstructurescouldofferauniqueopportunity for CAES to provide grid-scale energy storage capacity, seasonal load shifting, load balancing, peaking

359

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

to mount the passive samplers in a house. designed describedhouses screened for study List of Figures A.l A.2 A.3 A.4 PassivePassive Sampler Sampler Girman/Allen Girman/Allen Wednesday 16 November Test house (

Grimsrud, David T.

2009-01-01T23:59:59.000Z

360

Independent Scientific Review Panel for the Northwest Power & Conservation Council  

E-Print Network (OSTI)

. The habitat- monitoring plan is based in part on the Estuary RME Plan. To place the review of the habitat-monitoring project in the proper context, Bonneville and the Council requested that the ISRP review the draft planIndependent Scientific Review Panel for the Northwest Power & Conservation Council 851 SW 6 th

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Pacific Northwest Solar Radiation Data  

E-Print Network (OSTI)

: fev@darkwing.uoregon.edu BONNEVILLE POWER ADMINISTRATION Bonneville Power Administration George Darr

Oregon, University of

362

EIS-0170-SA-01: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis EIS-0170-SA-01: Supplement Analysis System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada...

363

Microsoft Word - 7B8E8D37.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

STATES OF AMERICA DEPARTMENT OF ENERGY acting by and through the BONNEVILLE POWER ADMINISTRATION and BRITISH COLUMBIA HYDRO AND POWER AUTHORITY Relating to: (1) Use of Columbia...

364

Authorizes Negotiations  

NLE Websites -- All DOE Office Websites (Extended Search)

, 1996 , 1996 Number 9 Secretary of Energy Authorizes Negotiations for Renewal of URA Contract INSIDE 2 Walton Receives DOE Environment Award 3 Cast in Concrete 4 Spring Cleaning 6 University Close-Up: Rutgers University 11 Labwide Celebration Invitation By Donald Sena, Office of Public Affairs On March 28, Secretary of Energy Hazel O'Leary authorized a five-year renewal of the Universities Research Association's contract to manage Fermi National Accelerator Laboratory, pending negotiation of various contrac- tual reforms that include lab-wide management performance measures. O'Leary, who allowed the contract to be noncompetitively renewed, said in a signed authorization: "...use of competitive procedures would cause unacceptable disruption in the manage- ment and operation of this major

365

Georgia Power Company (GPC), Oglethorpe Power Corporation (OPC...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Georgia Power Company (GPC), Oglethorpe Power Corporation (OPC), Municipal Electric Authority of Georgia (MEAG) Georgia Power Company (GPC), Oglethorpe Power Corporation (OPC),...

366

Record of Decision for the Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates (DOE/EIS-0183) (6/30/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION NATIONAL ENVIRONMENTAL POLICY ACT RECORD OF DECISION for the Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates INTRODUCTION The Bonneville Power Administration (BPA) has decided to implement its proposed Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates. This rate adjustment allows BPA to address potential revenue shortfalls and recover its costs through rates. This rate adjustment involves implementation of one of BPA's existing risk mitigation tools that has been previously subject to review under the National Environmental Policy Act (NEPA), as described more fully below. I have reviewed this previous NEPA documentation and determined that the SN CRAC rate adjustment is adequately covered within

367

Re-Analysis of Hydroacoustic Fish-Passage Data from Bonneville Dam after Spill-Discharge Corrections  

SciTech Connect

The U.S. Army Corps of Engineers - Portland District asked Pacific Northwest National Laboratory to re-analyze four years of fixed-aspect hydroacoustic data after the District made adjustments to spill discharge estimates. In this report, we present new estimates of all major fish-passage metrics for study years 2000, 2001, 2002, and 2004, as well as estimates for 2005. This study supports the Portland District and its effort to maximize survival of juvenile salmon passing Bonneville Dam. Major passage routes through Bonneville Dam include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines at Powerhouse 2 (B2) and a sluiceway including the B2 Corner Collector. The original reports and all associated results, discussion, and conclusions for non flow-related metrics remain valid and useful, but effectiveness measures for study years 2000, 2001, 2002, and 2004 as reported in previous reports by Ploskey et al. should be superseded with the new estimates reported here. The fish-passage metrics that changed the most were related to effectiveness. Re-analysis produced spill effectiveness estimates that ranged from 12% to 21% higher than previous estimates in spring and 16.7% to 27.5% higher in summer, but the mean spill effectiveness over all years was only slightly above 1:1 (1.17 for spring and 1.29 for summer). Conversely surface-passage effectiveness decreased in the years this metric was measured (by 10.1% in spring and 10.7% in summer of 2002 and 9.5% in spring and 10.2% in summer of 2004). The smallest changes in the re-analysis were in project fish passage efficiency (0%-1%) and spill efficiency (0.9%-3.0%).

Ploskey, Gene R.; Kim, Jina; Weiland, Mark A.; Hughes, James S.; Fischer, Eric S.

2007-06-07T23:59:59.000Z

368

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.  

SciTech Connect

This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

369

7/21/11 3:22 PM New insights into the outlet conditions of Late Pleistocene Lake Bonneville, southeastern1  

E-Print Network (OSTI)

.923 #12;2 ka. An abandoned, meandering riverbed, north of the lower Provo sill, records a large northward7/21/11 3:22 PM 1 New insights into the outlet conditions of Late Pleistocene Lake Bonneville, southeastern1 Idaho, USA.2 Susanne U. Janecke1 and Robert Q. Oaks, Jr1 3 1 Department of Geology4 4505 Old Main

Janecke, Susanne

370

Q&A: Plugging In with a Power Lineman | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Q&A: Plugging In with a Power Lineman Q&A: Plugging In with a Power Lineman Q&A: Plugging In with a Power Lineman October 18, 2012 - 4:17pm Addthis To commemorate what BPA considers a 75-year partnership with the Columbia River, which is the cornerstone of BPA's relationship with the people and utilities of the Northwest, BPA releases the second video of a series detailing its history. You can see the rest of the series on BPA's 75th Anniversary YouTube channel. Teresa Waugh Public Affairs Specialist, Bonneville Power Administration What does a power lineman do? Linemen work on the complex electrical systems that power our homes and businesses. They climb poles to perform maintenance and work to restore downed power lines after storms. This Q&A and video are part of a series produced by the Bonneville Power

371

AUTHORITY | Department of Energy  

Office of Environmental Management (EM)

AUTHORITY AUTHORITY AUTHORITY More Documents & Publications Department of Energy No No ALFAL 99-01...

372

PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (DOE/EIS-0171)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement (DOE/EIS-0171) Statement (DOE/EIS-0171) file:///I|/Data%20Migration%20Task/EIS-0171-FEIS-1994/01.htm[6/27/2011 10:47:34 AM] PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (DOE/EIS-0171) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: PacifiCorp Capacity Power Sale Contract States and Provinces Involved: Washington, Oregon, Idaho, Montana, Wyoming, Utah, Colorado, New Mexico, California, Nevada, Arizona, British Columbia. Abstract: The Bonneville Power Administration (BPA) has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of firm power customers, pursuant to the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power

373

Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.  

SciTech Connect

This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

United States. Bonneville Power Administration.

1993-07-01T23:59:59.000Z

374

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

375

Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report  

SciTech Connect

This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelts dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

2013-07-31T23:59:59.000Z

376

Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008  

SciTech Connect

This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

2009-09-01T23:59:59.000Z

377

Oregon Willamette River Basin Mitigation Agreement | Open Energy...  

Open Energy Info (EERE)

Willamette River Basin Mitigation Agreement Author State of Oregon Recipient Bonneville Power Administration Published Publisher Not Provided, 10222010 DOI Not Provided Check for...

378

Microsoft Word - PTPC_BAASA_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to enter into a Balancing Authority Area Services Agreement (BAASA) with Port...

379

Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1  

SciTech Connect

This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

Carlson, Thomas J.; Weiland, Mark A.

2001-01-30T23:59:59.000Z

380

UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UTILITIES UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone (706) 213-3823 Email annc@sepa.doe.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OKLAHOMA SOUTHWESTERN POWER ADMIN POC Gary Bridges Telephone (918) 595-6671 Email gary.bridges@swpa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OREGON BONNEVILLE POWER ADMIN POC Greg Eisenach Telephone (360) 418-8063 Email gaeisenach@bpa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 PENNSYLVANIA NATIONAL ENERGY TECHNOLOGY LAB - PA POC Larry Sullivan

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Clotrimazole as a Potent Agent for Treating the Oomycete Fish Pathogen Saprolegnia parasitica through Inhibition of Sterol 14?-Demethylase (CYP51)  

Science Journals Connector (OSTI)

...Department of Energy, Bonneville Power Administration, Portland, OR. 16...Department of Energy, Bonneville Power Administration, Portland OR. 24...Department of Energy, Bonneville Power Administration, Portland, OR. 68...

Andrew G. S. Warrilow; Claire M. Hull; Nicola J. Rolley; Josie E. Parker; W. David Nes; Stephen N. Smith; Diane E. Kelly; Steven L. Kelly

2014-08-01T23:59:59.000Z

382

Influence of multiple dam passage on survival of juvenile Chinook salmon in the Columbia River estuary and coastal ocean  

Science Journals Connector (OSTI)

...14 . 9 BPA ( 2010 ) Bonneville Power Administration annual report, DOE/BP-4224 ( Bonneville Power Administration , Portland, OR ). 10...and reservoirs, 2011 ( Bonneville Power Administration , Portland, OR...

Erin L. Rechisky; David W. Welch; Aswea D. Porter; Melinda C. Jacobs-Scott; Paul M. Winchell

2013-01-01T23:59:59.000Z

383

Nuclear Powers Benefits  

Science Journals Connector (OSTI)

Nuclear Powers Benefits ... Using nuclear power in place of fossil-fuel energy sources, such as coal, has prevented some 1.8 million air-pollution-related deaths and 64 gigatons of carbon emissions globally over the past four decades, a study concludes. ... These estimates suggest policymakers should continue to rely on and expand nuclear power in place of fossil fuels to mitigate climate change, the authors say (Environ. ...

MARK SCHROPE

2013-04-08T23:59:59.000Z

384

Property:File/Author | Open Energy Information  

Open Energy Info (EERE)

Author Author Jump to: navigation, search Property Name File/Author Property Type String Description Individual that created the original file. Note that this will often not be the same as the individual that uploads the file to OpenEI. Pages using the property "File/Author" Showing 25 pages using this property. (previous 25) (next 25) B Banglmetst 221.pdf + Donna Heimiller + BrazilTMYst 238.pdf + Donna Heimiller + C Cammetst 58.pdf + Donna Heimiller + China Chifeng 50m Wind Power.pdf + Donna Heimiller + China Enshi 50m Wind Power.pdf + Donna Heimiller + China Fuzhou 50m Wind Power.pdf + Donna Heimiller + China Guangzhou 50m Wind Power.pdf + Donna Heimiller + China Haikou 50m Wind Power.pdf + Donna Heimiller + China Hangzhou 50m Wind Power.pdf + Donna Heimiller +

385

Research, Monitoring and Evaluation and Artificial Production Project Review Final Decision document June 10, 2011 w/ July 2011 addition  

E-Print Network (OSTI)

contains and explains the Council's recommendations to the Bonneville Power Administration for the funding on the Bonneville Power Administration to use its fund and other authorities to protect, mitigate, and enhance) Introduction Pursuant to Section 4(h)(10)(D) of the Northwest Power Act, the Northwest Power and Conservation

386

Ensure Continuous Power to Critical Industrial Processes with the New Superconducting Storage Device (SSD)  

E-Print Network (OSTI)

Administration system. In that project a superconducling coil was used to provide energy to stabilizc a transmission line. Sl's focus on the benefits of superconducting magnetic energy storage Figure I. SI cryostat in an SSO trailer. 63 ESL-IE-92... capacity, While superconducting magnets have bcen used for over 10 years for magnetic resonance imaging, the only previous use of superconductivity for power systems has been a research project in the early eightjes on the Bonneville Power...

Dewinkel, C. C.; Koeppe, P. F.

387

IACR Guidelines for Authors Dear Author,  

E-Print Network (OSTI)

be obtained from http://www.iacr.org/docs/. Editors of this document: Nigel Smart (2014). 1 #12;IACR: · Parallel submissions: A parallel submission occurs when authors submit essentially the same material to one of new material, and without proper attribution of the source, by other "author(s)." Such submissions

International Association for Cryptologic Research (IACR)

388

A Guide to Community Shared Solar: Utility, Private, and Nonprofit Project Development (Book), Powered by SunShot, U.S. Department of Energy (DOE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to to Community Shared Solar: Utility, Private, and Nonpro t Project Development ACKNOWLEDGEMENTS This guide is an updated version of the original Guide to Community Solar, published November 2010 (see www.nrel.gov/docs/fy11osti/49930.pdf), which was developed for the National Renewable Energy Laboratory by Northwest Sustainable Energy for Economic Development, Keyes and Fox, Stoel Rives, and the Bonneville Environmental Foundation. This guide builds on the research and writing from the Northwest Community Solar Guide, published by Bonneville Environmental Foundation and Northwest SEED. AUTHORS Jason Coughlin, Jennifer Grove, Linda Irvine, Janet F. Jacobs, Sarah Johnson Phillips, Alexandra Sawyer, Joseph Wiedman REVIEWERS AND CONTRIBUTORS Dick Wanderscheid, Bonneville Environmental Foundation; Stephen Frantz, Sacramento Municipal

389

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

390

Bulk Power System Dynamics and Control IV -Restructuring, August 24-28, Santorini, Greece. Improving Pacific Inter-tie Stability Using  

E-Print Network (OSTI)

, and C) Slatt TCSC (on the Slatt-Buckley 500 kV line); and 2) to design robust controls@eecs.wsu.edu Transmission Operations and Planning Bonneville Power Administration Vancouver, WA 98666-0491 Abstract voltage control needs for the stability support of COI lines in the Pacific Northwest system. The proposed

Venkatasubramanian, Mani V.

391

Report to the Western Water Policy Review Advisory Commission  

E-Print Network (OSTI)

.4 The Bonneville Power Administration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 (1) Water

Selker, John

392

Special Inquiry: DOE/IG-0895 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/IG-0895 DOE/IG-0895 Special Inquiry: DOE/IG-0895 October 3, 2013 Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration The Office of Inspector General received a complaint alleging prohibited personnel practices at Bonneville. The allegations included violations of OPM regulations and the inappropriate dismissal of veterans during their probationary period. The complaint also alleged violations of Department policies regarding the application of veterans' preference and the use of the category rating process in the exercise of Bonneville's delegated examining authority for competitive hiring. We found that Bonneville's hiring practices disadvantaged veterans and other applicants. Bonneville consistently manipulated the applicant

393

Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System; 21Feb1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Bonneville Power Administration Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System (FCRPS) AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE) ACTION: Record of Decision (ROD) SUMMARY: The Columbia River System Operation Review (SOR) Environmental Impact Statement (EIS) assessed operations at the 14 Federal dams and reservoirs on the Columbia and lower Snake Rivers that have a major influence on the multiple purpose system operation, and for which power production is coordinated under the Pacific Northwest Coordination Agreement. Lead agencies for this six-year process were the U.S. Army Corps of Engineers (Corps), the U.S. Bureau of Reclamation

394

Energy: Shortages Loom, but Conservation Lags  

Science Journals Connector (OSTI)

...new facility than by buying power from another com-pany for...their monopolistic hold 1158 on power supply in many parts of the...Val-ley Authority and the Bonneville Power Administration. Representative Ken Hechler...

Constance Holden

1973-06-15T23:59:59.000Z

395

Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007  

SciTech Connect

The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

2008-03-12T23:59:59.000Z

396

Georgia Environmental Finance Authority - Residential Energy Efficiency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Georgia Environmental Finance Authority - Residential Energy Georgia Environmental Finance Authority - Residential Energy Efficiency Loan Program (Georgia) Georgia Environmental Finance Authority - Residential Energy Efficiency Loan Program (Georgia) < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Design & Remodeling Windows, Doors, & Skylights Ventilation Construction Heating Heat Pumps Water Heating Program Info State Georgia Program Type State Loan Program Rebate Amount Oglethorpe Power Corporation: $5,500 Electric Cities of Georgia: up to $5,000 Municipal Gas Authority of Georgia: up to $5,000 Estes Heating and Air (Statewide): $10,000 The Georgia Environmental Finance Authority (GEFA) encourages Georgians to

397

DOD Third Party Financing Authorities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 rd Party Financing Authorities Joseph Sikes, Director OSD Facilities Energy & Privatization DoD 3 rd Party Financing Authorities - Power Purchase Agreements (PPAs) - 10 years - FAR Part 41 - Up to 30 years - 10 U.S.C. § 2922a - Enhanced Use Lease (EUL) - 5 years or longer with approval - 10 U.S.C. § 2667 - Energy Savings Performance Contracts (ESPCs) - Up to 25 years - 42 U.S.C. 8256 / 10 U.S.C. § 2913 - Utility Energy Service Contracts (UESCs) - 10 years - 10 U.S.C. § 2913 provides for obtaining the savings and benefits of a UESC, but does not contain any authority to contract beyond the 10-year limit provided generally for utility contracts under 40 U.S.C. § 501(b)(1)(B) 10 U.S.C. § 2922a - Secretary of a Military Department may enter into contract for up to 30 years with

398

Annual Report to the Bonneville Power Administration, Reporting Period: April 2008 - February 2009 [re: "Survival and Growth in the Columbia River Plume and north California Current"].  

SciTech Connect

We have made substantial progress toward our objectives outlined in our BPA supported proposal entitled 'Columbia River Basin Juvenile Salmonids: Survival and Growth in the Columbia River Plume and northern California Current' which we report on herein. During 2008, we were able to successfully conduct 3 mesoscale cruises. We also were able to conduct 7 biweekly predator cruises, along with substantial shore-based visual observations of seabirds. Detailed results of the mesoscale cruises are available in the Cruise Reports and summarized in the next section. We have taken a proactive approach to getting the results of our research to fisheries managers and the general public. We have begun to make annual predictions based on ocean conditions of the relative survival of juvenile coho and Chinook salmon well before they return as adults. This is based on both biological and physical indicators that we measure during our surveys or collect from outside data sources. Examples of our predictions for 2009 and 2010 are available on the following web site: http://www.nwfsc.noaa.gov/research/divisions/fed/oeip/a-ecinhome.cfm.

Northwest Fisheries Science Center, NOAA Fisheries; Cooperative Institute for Marine Resources Studies, Oregon State University; OGI School of Science & Engineering, Oregon Health Sciences University.

2009-07-17T23:59:59.000Z

399

CFO .:. Signature Authority Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Presentations Strategic Plan Ten Commandments Budget Office Business Systems Analysis Conference Services Controller's Office Field Operations Financial Policy & Assurance Human Resources in the OCFO Procurement & Property Office of Sponsored Projects & Industry Partnerships Training Travel Office spacer OCFO Home Send Feedback Signature Authority Guidelines LBNL Signature Authority Guidelines for Operational Transactions Signature Authorization System (SAS) Database in BRS: The Authorized Signers List can be found in the BLIS Reporting System (BRS) in the purchasing folder.You will need your LDAP username and password to access this database. Access the BLIS Reporting System (BRS) by clicking HERE. Delegation of Signature Authority Form: All requests for signature authority for Laboratory employees in the

400

EA-337 Synergy Power Marketing, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Synergy Power Marketing, Inc. EA-337 Synergy Power Marketing, Inc. Order authorizing Synergy Power Marketing, Inc to export electric energy to Canada EA-337 Synergy Power...

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EA-318 CSW Power Marketing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CSW Power Marketing EA-318 CSW Power Marketing Order authorizing CSW Power Marketing to export electric energy to Mexico EA-318 CSW Power Marketing More Documents & Publications...

402

EA-290 Ontario Power Generation, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ontario Power Generation, Inc. EA-290 Ontario Power Generation, Inc. Order authorizing Ontario Power Generation, Inc. to export electric energy to Canada EA-290 Ontario Power...

403

Power Purchase Agreement Webinars  

Energy.gov (U.S. Department of Energy (DOE))

Provides a listing of past power purchase agreement webinars and associated files. Author: U. S. Department of Energy, Energy Efficiency & Renewable Energy

404

Solar Power Purchase Agreements  

Energy.gov (U.S. Department of Energy (DOE))

Provides an overview of solar power purchase agreements including how they work, benefits and challenges and eligibility. Author: United States Environmental Protection Agency (EPA)

405

Export Authorizations - Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Export Authorizations - Procedures Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be allowed unless the proposed export would impair the sufficiency of electric power supply within the U.S. or would impede or tend to impede the coordinated use of the U.S. power supply network. Based on these guidelines, DOE will grant authorization to export electric energy if it is determined that: 1.Sufficient generating resources exist such that the exporter could sustain the export while still maintaining adequate generating resources to meet all firm supply obligations; and, 2.The export would not cause operating parameters on regional transmission systems to fall outside of established industry criteria.

406

Pooling Authority Interim Enforcement Program Adopted Dec 19, 2011 Section 1: Definitions  

E-Print Network (OSTI)

Conservation and Development Commission. General Manager: The person responsible for implementing the Pooling Pooling Authority. Pooling Authority: Power & Water Resources Pooling Authority. Renewable EnergyPooling Authority Interim Enforcement Program ­ Adopted Dec 19, 2011 1 Section 1: Definitions

407

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project file:///I|/Data%20Migration%20Task/EIS-0230-FEIS-1995/01_EIS0230_rcp.html[6/27/2011 1:26:50 PM] Resource Contingency Program-Oregon Final Environmental Impact Statement Hermiston Power Project Introduction The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by

408

Lakeview Light and Power - Commercial Lighting Rebate Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lakeview Light and Power - Commercial Lighting Rebate Program Lakeview Light and Power - Commercial Lighting Rebate Program Lakeview Light and Power - Commercial Lighting Rebate Program < Back Eligibility Commercial Fed. Government Local Government Nonprofit State Government Savings Category Appliances & Electronics Commercial Lighting Lighting Program Info Funding Source Funded by Bonneville Power Administration Expiration Date 9/1/2013 State District of Columbia Program Type Utility Rebate Program Rebate Amount Commercial Lighting Installation: Up to 70% of cost Provider Lakeview Light and Power Lakeview Light and Power offers a commercial lighting rebate program. Rebates apply to the installation of energy efficient lighting retrofits in non-residential buildings. The rebate program is funded by BPA and ends in September of 2010 or earlier if the funding is exhausted. Lakeview Light

409

Particle Data Group - Authors  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Edition and 2007 Web Update 6 Edition and 2007 Web Update (Click on Author Name to get Email address, phone numbers, etc.) RPP authors New authors of 2007 Web Update M. Antonelli, 102 H. Baer, 64 G. Bernardi, 103 M. Carena, 51 M.-C. Chen, 11 B. Dobrescu, 51 J.-F. Grivaz, 104 T. Gutsche, 105 J. Huston, 45 T. Junk, 51 C.-J. Lin, 1 H. Mahlke, 106 P. Mohr, 107 P. Nevski, 75 S. Rolli, 108 A. Romaniouk, 109 B. Seligman, 110 M. Shaevitz, 111 B. Taylor, 107 M. Titov, 56,112 G. Weiglein, 78 A. Wheeler, 69 Authors of the 2006 Review of Particle Physics W.-M. Yao et al. (Particle Data Group), J. Phys. G 33, 1 (2006) (bibtex format) Also see: PS format or PDF format. AUTHORS OF LISTINGS AND REVIEWS: (Click on Author Name to get Email address, phone numbers, etc.) RPP authors (RPP 2006)

410

BPA Statutes.  

SciTech Connect

This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

United States. Bonneville Power Administration.

1999-08-01T23:59:59.000Z

411

REQUEST FOR RECORDS DISPOSITION AUTHORITY | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power Plant Docket Records REQUEST FOR RECORDS DISPOSITION AUTHORITY More Documents & Publications PIA - Savannah River Remediation Accreditation Boundary (SRR AB) REQUEST...

412

author | OpenEI Community  

Open Energy Info (EERE)

13 13 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234313 Varnish cache server author Home Developer Description: Developer community for OpenEI data, and helpful information for OpenEI wiki authors Enabling developers to use energy web services on OpenEI, REEGLE.info, Data.gov and across the web. We help developers find quality data, understand data provenance and assist with web service integration. We also help "power wiki" users develop complex Ask queries, SPARQL queries

413

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

414

Bolivar Energy Authority | Open Energy Information  

Open Energy Info (EERE)

Energy Authority Energy Authority Jump to: navigation, search Name Bolivar Energy Authority Place Tennessee Utility Id 1936 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Power Rate, part 1- 0 TO 50 kw & Less Than 15,000 Kwh Commercial General Power Rate, part 2- Over 50 Kw To 1000 Kw or Over 15,000 Kwh Commercial General Power Rate, part 3- Over 1000 Kw Commercial Outdoor Lighting Rates 100Watt Sodium Lighting Outdoor Lighting Rates 250Watt Sodium Lighting Outdoor Lighting Rates 400Watt Metal Halide Lighting

415

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam : Annual Report October 2007-September 2008  

SciTech Connect

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations - a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezometers. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet. During our overall monitoring period (October 2007 through June 2008), mean temperature in chum spawning areas was nearly 2 C warmer within the riverbed than in the overlying river. During chum salmon spawning (mid-November 2007 through December2007), mean riverbed temperature in the Ives Island area was 14.5 C, more than 5 C higher than in the river, where mean temperature was 9.4 C. During the incubation period (January 2008 through mid-May 2008), riverbed temperature was approximately 3 C greater than in the overlying river (10.5 C and 7.2 C, respectively). Chum salmon preferentially select spawning locations where riverbed temperatures are elevated; consequently the incubation time of alevin is shortened before they emerge in the spring.

Arntzen, E.V. [Pacific Northwest National Laboratory

2009-07-14T23:59:59.000Z

416

Applying the Leap Experience to Monitoring of Commercial Buildings in Hot and Humid Climates  

E-Print Network (OSTI)

to date. This project was initiated in 1983 at Pacific Northwest Laboratory for the Bonneville Power Administration, the federal power marketing authority for the Pacific Northwest. Entitled the End-Use Load and Consumer Assessment Program (ELCAP... to date. This project was initiated in 1983 at Pacific Northwest Laboratory for the Bonneville Power Administration, the federal power marketing authority for the Pacific Northwest. Entitled the End-Use Load and Consumer Assessment Program (ELCAP...

Mazzucchi, R. P.; Stoops, J. L.

1988-01-01T23:59:59.000Z

417

Palaeoclimate Coordinating Lead Authors  

E-Print Network (OSTI)

6 Palaeoclimate Coordinating Lead Authors: Eystein Jansen (Norway), Jonathan Overpeck (USA) Lead (UK) This chapter should be cited as: Jansen, E., J. Overpeck, K.R. Briffa, J.-C. Duplessy, F. Joos, V

418

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

419

Power Marketing Administrations Poised to Make Another Big Contribution to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administrations Poised to Make Another Big Marketing Administrations Poised to Make Another Big Contribution to America's Progress Power Marketing Administrations Poised to Make Another Big Contribution to America's Progress March 16, 2012 - 9:00am Addthis Lauren Azar Senior Advisor to Secretary Chu Most Americans have never heard of the Department of Energy's Power Marketing Administrations (PMAs), but these four organizations are a crucial part of the country's electricity infrastructure - past, present and future. Starting with the Bonneville Power Administration in 1937, Congress established the Power Marketing Administrations to distribute and sell electricity from a network of more than 130 federally built hydroelectric dams, including the Hoover Dam, the Columbia River dams, and others throughout the United States. While the PMAs -- which also include the

420

Work Authorization System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EA-164-A Constellation Power Source, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Source, Inc EA-164-A Constellation Power Source, Inc Order authorizing Constellation Power Source, Inc to export electric energy to Canada. EA-164-A...

422

EA-164 Constellation Power Source, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Constellation Power Source, Inc EA-164 Constellation Power Source, Inc Order authorizing Constellation Power Source, Inc to export electric energy to Canada. EA-164 Constellation...

423

EA-378 Cargill Power Markets LLC | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Markets LLC EA-378 Cargill Power Markets LLC Order authorizing Cargill Power Markets to export electric energy to Mexico. EA-378 CPM MX.pdf More Documents &...

424

EA-200 American Electric Power Service Corporation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Electric Power Service Corporation EA-200 American Electric Power Service Corporation Order authorizing American Electric Power Service Corporation to export electric...

425

EA-64 Basin Electric Power Cooperative | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Basin Electric Power Cooperative EA-64 Basin Electric Power Cooperative Order authorizing Basin Electric Power Cooperative to export electric energy to Canada EA-64 Basin Electric...

426

EA-82 Vermont Electric Power Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82 Vermont Electric Power Company EA-82 Vermont Electric Power Company Order authorizing Vermont Electric Power Company to export electric energy to Canada EA-82 Vermont Electric...

427

PP-82 Vermont Electric Power Company, Inc. (VELCO) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vermont Electric Power Company, Inc. (VELCO) PP-82 Vermont Electric Power Company, Inc. (VELCO) Presidental Permit authorizing Vermont Electric Power Company, Inc. (VELCO) to...

428

PP-43 Maine Electric Power Company, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Maine Electric Power Company, Inc. PP-43 Maine Electric Power Company, Inc. Presidential Permit authorizing Maine Electric Power Company, Inc. to construct, operate, and maintain...

429

PP-13 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission...

430

PP-78 Minnesota Power & Light Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Minnesota Power & Light Company PP-78 Minnesota Power & Light Company Presidential Permit authorizing Minnesota Power & Light Company to construct, operate, and maintain electric...

431

PP-94 Central Power & Light Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Central Power & Light Company PP-94 Central Power & Light Company Presidental Permit authorizing Central Power & Light Company to construct, operate, and maintain electric...

432

PP-219 Central Power and Light Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19 Central Power and Light Company PP-219 Central Power and Light Company Presidential permit authorizing Central Power and Light Company to construct, operate, and maintain...

433

PP-6 Puget Sound Power & Light Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Puget Sound Power & Light Company PP-6 Puget Sound Power & Light Company Presidential permit authorizing Puget Sound Power & Light Company to construct, operate, and maintain...

434

EA-290-B Ontario Power Generation, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-B Ontario Power Generation, Inc. EA-290-B Ontario Power Generation, Inc. Order authorizing Ontario Power Generation, Inc. to export electric energy to Canada EA-290-B Ontario...

435

EA-290-A Ontario Power Generation, Inc. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-A Ontario Power Generation, Inc. EA-290-A Ontario Power Generation, Inc. Order authorizing Ontario Power Generation, Inc. to export electric energy to Canada EA-290-A Ontario...

436

Authority and the Individual  

Science Journals Connector (OSTI)

... are empiricists in the best sense of the term. For them questions of authority and liberty, of what things should be decided by government and enforced by it, and what ... Mill's day the chief threat to welfare came from too much exercise of individual liberty and too little or ineffective government control. Now it is much more nearly the ...

A. D. RITCHIE

1949-08-06T23:59:59.000Z

437

Work Authorization System  

Directives, Delegations, and Requirements

It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

1999-04-20T23:59:59.000Z

438

Work Authorization System  

Directives, Delegations, and Requirements

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

2005-04-21T23:59:59.000Z

439

Work Authorization System  

Directives, Delegations, and Requirements

To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

2005-04-21T23:59:59.000Z

440

Can Science Rescue Salmon?  

Science Journals Connector (OSTI)

...funded mostly by the Bonneville Power Administration (which markets power...574 ). Funded by the Bonneville Power Administration, PATH had a...funded mostly by the Bonneville Power Administration (which markets power...

Charles C. Mann; Mark L. Plummer

2000-08-04T23:59:59.000Z

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

FFTF Authorization Agreement  

SciTech Connect

The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently in the Fast Flux Test Facility (FFTF). Work must be accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public, and complying with applicable contractual and regulatory requirements. It is the intent of this Agreement to address those items of significant importance in establishing and supporting the FFTF Authorization Envelope, but this Agreement in no way alters the terms and conditions of the Project Hanford Management Contract (PHMC), Contract Number DE-AC06-96RL13200.

DAUTEL, W.A.

2000-09-25T23:59:59.000Z

442

Breeze Wind Power In China.  

E-Print Network (OSTI)

?? China is an energy production and consumption country, wind power is one of the greatest development potential energy.The authors use literature research methodology, case (more)

wang, zhong tao

2012-01-01T23:59:59.000Z

443

Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN  

SciTech Connect

The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG&E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it`s new marketing plan.

Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

1996-11-01T23:59:59.000Z

444

Power Plant Power Plant  

E-Print Network (OSTI)

Basin Center for Geothermal Energy at University of Nevada, Reno (UNR) 2 Nevada Geodetic LaboratoryStillwater Power Plant Wabuska Power Plant Casa Diablo Power Plant Glass Mountain Geothermal Area Lassen Geothermal Area Coso Hot Springs Power Plants Lake City Geothermal Area Thermo Geothermal Area

Tingley, Joseph V.

445

Power Factor Reactive Power  

E-Print Network (OSTI)

power: 130 watts Induction motor PSERC Incandescent lights 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0 power: 150 watts #12;Page 4 PSERC Incandescent Lights PSERC Induction motor with no load #12;Page 5 Incandescent Lights #12;Page 7 PSERC Incandescent lights power: Power = 118 V x 1.3 A = 153 W = 0.15 kW = power

446

Personality, Authority, and Society  

E-Print Network (OSTI)

and claims th J . I O' I at a . ewis 1 iaspora lad no place in Germany he was in the habi re di . id d It of.sp~n lng -- as IS eVI ~nce by a recently published collection _. of hIS late letters -- that If everything in Germany was alread ' bad. h~ certainly... to a large extent :;n i~s mterpreranon."3 An intensive theoretical investigation into the 87 Persona/it)', Authority, and Society problem of authoritarian cognitive structures had already taken place in the thirties, as part of the Institute's Studies...

Werz, Michael

1998-04-01T23:59:59.000Z

447

Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2001 Annual Report.  

SciTech Connect

Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion measures resulted in very poor in-river migration conditions in 2001. Up to 99% of Snake River yearling chinook and steelhead were transported from the Snake River collection projects. Approximately 96% of Snake River juvenile sub-yearling fall chinook were transported. Of Mid-Columbia origin yearling chinook, 35% were transported, of steelhead 30% were transported and of sub yearling chinook, 59% were transported. Based upon data collected on the run-at-large, the juvenile survival to Lower Granite Dam of wild and hatchery yearling chinook and wild and hatchery steelhead were the lowest observed in the last four years. In 2001, as the result of the lowest observed flows in recent years, travel times through the hydro system for spring chinook yearlings and steelhead was approximately twice as long as has been observed historically. Juvenile survival estimates through each index reach of the hydro system for steelhead and chinook juveniles was the lowest observed since the use of PIT tag technology began for estimating survival.

DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

2002-07-01T23:59:59.000Z

448

CX-011238: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Balancing Authority Area Services Agreement with Port Townsend Paper Corporation CX(s) Applied: B4.1 Date: 10/10/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration

449

Daily forecasts of Columbia River plume circulation: a tale of spring/summer cruises  

E-Print Network (OSTI)

Science Foundation (OCE-0424602; OCE-0622278), Bonneville Power Administration, and National Oceanic and Atmospheric Administration (AB133F04CN0033) Submitted to JGR on July 11, 2008 1 Corresponding author; e

Jay, David

450

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Power Administration for their contributions to this work through the testing of air conditioning units for their technical assistance and guidance. The authors also thank Dmitry Kosterev and Steve Yang of the Bonneville

451

Genetic adaptation to captivity can occur in a single generation  

Science Journals Connector (OSTI)

...I. Phillipsen, and L. Curtis for insightful discussions. This research was funded by a grant from the Bonneville Power Administration (to M.S.B.). The authors declare no conflict of interest. This article is a PNAS Direct Submission...

Mark R. Christie; Melanie L. Marine; Rod A. French; Michael S. Blouin

2012-01-01T23:59:59.000Z

452

Power Subscription Strategy: Administrator`s Record of Decision.  

SciTech Connect

The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

United States. Bonneville Power Administration

1998-12-01T23:59:59.000Z

453

FRPC User Guidance -for FY2006  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Western Area Power Administration 89 13 Naval Petroleum and Oil Naval Petroleum and Oil Shale Reserves 89 14 Bonneville Power Adminis Bonneville Power Administration 89 15...

454

CX-010428: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to remove six power circuit breakers (PCBs) and install new PCBs within...

455

Electrical Energy Conservation and Peak Demand Reduction Potential for Buildings in Texas: Preliminary Results  

E-Print Network (OSTI)

diversity factors, building thermal integrity, climate zone, and appliance saturations. Building stock growth rates were estimated from regional population and employment census data. Also, energy audit data from the Bonneville Power Authority (9) were... diversity factors, building thermal integrity, climate zone, and appliance saturations. Building stock growth rates were estimated from regional population and employment census data. Also, energy audit data from the Bonneville Power Authority (9) were...

Hunn, B. D.; Baughman, M. L.; Silver, S. C.; Rosenfeld, A. H.; Akbari, H.

1985-01-01T23:59:59.000Z

456

DSW Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

457

Enel Green Power- Innovative Geothermal Power for Nevada | Open Energy  

Open Energy Info (EERE)

Enel Green Power- Innovative Geothermal Power for Nevada Enel Green Power- Innovative Geothermal Power for Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Periodical: Enel Green Power- Innovative Geothermal Power for Nevada Abstract Two binary geothermal power plants inaugurated today with a total capacity of 65 MW: They will generate enough energy to meet the needs of some 40 thousand American households. Author Hank Sennott Published Press Release, 04/15/2009 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Enel Green Power- Innovative Geothermal Power for Nevada Citation Hank Sennott. 04/15/2009. Enel Green Power- Innovative Geothermal Power for Nevada. Press Release. 1-2. Retrieved from "http://en.openei.org/w/index.php?title=Enel_Green_Power-_Innovative_Geothermal_Power_for_Nevada&oldid=680547"

458

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

459

Electric Power Lines : Questions and Answers on Research into Health Effects.  

SciTech Connect

Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

United States. Bonneville Power Administration.

1993-11-01T23:59:59.000Z

460

Electric Power Lines : Questions and Answers on Research into Health Effects.  

SciTech Connect

Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

United States. Bonneville Power Administration.

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Presidential Permits and Export Authorizations - About the Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permits and Export Presidential Permits and Export Authorizations - About the Program Presidential Permits and Export Authorizations - About the Program The Federal international electricity program consists of two elements: 1.Granting Presidential permits for the construction, connection, operation and/or maintenance of electric transmission lines which cross the U.S. international border; and 2.Authorizing exports of electric energy to foreign countries. The authority to grant Presidential permits is derived from the constitutional power of the President to protect the territorial integrity of the United States. The authority to regulate the export of electric energy is based on the statutory authority contained in section 202(e) of the Federal Power Act (FPA). Executive Order 8202, issued by President Roosevelt in 1939, prohibited

462

Chloral Hydrate Warning Author(s): Martyn T. Smith  

E-Print Network (OSTI)

Chloral Hydrate Warning Author(s): Martyn T. Smith Source: Science, New Series, Vol. 250, No. 4979 associated with its use. MARTYNT. SMITH DepartmentofBiomedicaland EnvironmentalHealthSciences, Schoolof

California at Berkeley, University of

463

Author's personal copy Unhealthy travelers present challenges to  

E-Print Network (OSTI)

Author's personal copy Unhealthy travelers present challenges to sustainable primate ecotourism: Ecotourism can function as a powerful tool for species conservation. However, a significant proportion.03.004 #12;Author's personal copy Introduction Ecotourism accounts for a significant proportion of all

Muehlenbein, Michael

464

Authoring Multi-Actor Behaviors in Crowds with Diverse Personalities  

E-Print Network (OSTI)

crowd dynamics are captured using the OCEAN personality model, and a centralized automated planner a method of authoring that is intuitive, simple, auto- matic, yet has enough expressive power to control and authorable computational models of when and how they interact. First, we present a method to capture social

Plotkin, Joshua B.

465

Living and Working Safely Around High-Voltage Power Lines.  

SciTech Connect

High-voltage transmission lines can be just as safe as the electrical wiring in the homes--or just as dangerous. The crucial factor is ourselves: they must learn to behave safely around them. This booklet is a basic safety guide for those who live and work around power lines. It deals primarily with nuisance shocks due to induced voltages, and with potential electric shock hazards from contact with high-voltage lines. References on possible long-term biological effects of transmission lines are shown. In preparing this booklet, the Bonneville Power Administration has drawn on more than 50 years of experience with high-voltage transmission. BPA operates one of the world`s largest networks of long-distance, high-voltage lines. This system has more than 400 substations and about 15,000 miles of transmission lines, almost 4,400 miles of which are operated at 500,000 volts.

United States. Bonneville Power Administration.

2001-06-01T23:59:59.000Z

466

Particle Data Group - Authors  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Edition 8 Edition C. Amsler et al. (Particle Data Group), Physics Letters B667, 1 (2008) Also see: PDF format. AUTHORS: (Click on Author Name to get Email address, phone numbers, etc.) RPP authors C. Amsler, 1 M. Doser, 2 M. Antonelli, 3 D. Asner, 4 K.S. Babu, 5 H. Baer, 6 H.R. Band, 7 R.M. Barnett, 8 J. Beringer, 8 E. Bergren, G. Bernardi, 9 W. Bertl, 10 H. Bichsel, 11 O. Biebel, 12 P. Bloch, 2 E. Blucher, 13 S. Blusk, 14 R.N. Cahn, 8 M. Carena, 15,13,16 C. Caso, 17,* A. Ceccucci, 2 D. Chakraborty, 18 M.-C. Chen, 19 R.S. Chivukula, 20 G. Cowan, 21 O. Dahl, 8 G. D'Ambrosio, 22 T. Damour, 23 A. de Gouvea, 24 T. DeGrand, 25 B. Dobrescu, 15 M. Drees, 26 A. Edwards, 27 S. Eidelman, 28 V.D. Elvira, 15 J. Erler, 29 V.V. Ezhela, 30 J.L. Feng, 19 W. Fetscher, 31 B.D. Fields, 32 B. Foster, 33 T.K. Gaisser, 34 L. Garren, 15 H.-J. Gerber, 31 G. Gerbier, 35 T. Gherghetta, 36 G.F. Giudice, 2 M. Goodman, 37 C. Grab, 31 A.V. Gritsan, 38 J.-F. Grivaz, 39 D.E. Groom, 8 M. Grünewald, 40 A. Gurtu, 41,2 T. Gutsche, 42 H.E. Haber, 43 K. Hagiwara, 44 C. Hagmann, 45 K.G. Hayes, 46 J.J. Hernández-Rey, 47,¶ K. Hikasa, 48 I. Hinchliffe, 8 A. Höcker, 2 J. Huston, 20 P. Igo-Kemenes, 49 J.D. Jackson, 8 K.F. Johnson, 6 T. Junk, 15 D. Karlen, 50 B. Kayser, 15 D. Kirkby, 19 S.R. Klein, 51 I.G. Knowles, 52 C. Kolda, 53 R.V. Kowalewski, 50 P. Kreitz, 54 B. Krusche, 55 Yu.V. Kuyanov, 30 Y. Kwon, 56 O. Lahav, 57 P. Langacker, 58 A. Liddle, 59 Z. Ligeti, 8 C.-J. Lin, 8 T.M. Liss, 60 L. Littenberg, 61 J.C. Liu, 54 K.S. Lugovsky, 30 S.B. Lugovsky, 30 H. Mahlke, 62 M.L. Mangano, 2 T. Mannel, 63 A.V. Manohar, 64 W.J. Marciano, 61 A.D. Martin, 65 A. Masoni, 66 D. Milstead, 67 R. Miquel, 68 K. Mönig, 69 H. Murayama, 70,71,8 K. Nakamura, 44 M. Narain, 72 P. Nason, 73 S. Navas, 74,¶ P. Nevski, 61 Y. Nir, 75 K.A. Olive, 76 L. Pape, 31 C. Patrignani, 17 J.A. Peacock, 52 A. Piepke, 77 G. Punzi, 78 A. Quadt, 79, S. Raby, 80 G. Raffelt, 81 B.N. Ratcliff, 54 B. Renk, 82 P. Richardson, 65 S. Roesler, 2 S. Rolli, 83 A. Romaniouk, 84 L.J. Rosenberg, 11 J.L. Rosner, 13 C.T. Sachrajda, 85 Y. Sakai, 44 S. Sarkar, 86 F. Sauli, 2 O. Schneider, 87 D. Scott, 88 B. Seligman, 89 M. Shaevitz, 90 T. Sjöstrand, 91 J.G. Smith, 25 G.F. Smoot, 8 S. Spanier, 54 H. Spieler, 8 A. Stahl, 92 T. Stanev, 34 S.L. Stone, 14 T. Sumiyoshi, 93 M. Tanabashi, 94 J. Terning, 95 M. Titov, 96 N.P. Tkachenko, 30 N.A. Törnqvist, 97 D. Tovey, 98 G.H. Trilling, 8 T.G. Trippe, 8 G. Valencia, 99 K. van Bibber, 45 M.G. Vincter, 4 P. Vogel, 100 D.R. Ward, 101 T. Watari, 102 B.R. Webber, 101 G. Weiglein, 65 J.D. Wells, 103 M. Whalley, 65 A. Wheeler, 54 C.G. Wohl, 8 L. Wolfenstein, 104 J. Womersley, 105 C.L. Woody, 61 R.L. Workman, 106 A. Yamamoto, 44 W. -M. Yao, 8 O.V. Zenin, 30 J. Zhang, 107 R.-Y. Zhu 108 P.A. Zyla 8

467

Microsoft PowerPoint - DOE_Review_June2013-TrudnowskiV2.pptx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stability Stability Assessment DOE/OE Transmission Reliability R&D Internal Program Review Meeting June 27-28, 2013 Washington DC Dan Trudnowski, Montana Tech John Pierre, U of Wyoming 2 Project Overview * Objective: Develop, test, and refine algorithms to automatically estimate and quantify oscillations from PMUs in real time. * Application - Real-Time Situational Awareness based upon actual system observations * Time line: - April 2006 thru April 2015 * Participants: - Dan Trudnowski, Montana Tech - John Pierre, University of Wyoming - Louis Scharf, Colorado State University (Retired) - Lots of graduate students * Collaborators: - Ning Zhou, PNNL (funded independently) - Bonneville Power Administration * Advisors - John Hauer, PNNL (Retired) - Bill Mittelstadt, BPA (Retired) Dynamic Response Types

468

EA-209-B Cargill Power Markets, LLC | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Markets, LLC EA-209-B Cargill Power Markets, LLC Order authorizing Cargill Power Markets, LLC to export electric energy to Canada. EA-209-B Cargill Power Markets, LLC More...

469

EA-220-C NRG Power Marketing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20-C NRG Power Marketing EA-220-C NRG Power Marketing Order authorizing NRG Power Marketing to export electric energy to Canada EA-220-C NRG Power Marketing More Documents &...

470

EA-220 NRG Power Marketing LLC | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 NRG Power Marketing LLC EA-220 NRG Power Marketing LLC Order authorizing NRG Power Marketing LLC to export electric energy to Canada. EA-220-NRG Power Marketing LLC More...

471

EA-220-A NRG Power Marketing, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A NRG Power Marketing, Inc EA-220-A NRG Power Marketing, Inc Order authorizing NRG Power Marketing, Inc to export electric energy to Canada. EA-220-A NRG Power Marketing, Inc More...

472

EA-220-B NRG Power Marketing, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B NRG Power Marketing, Inc EA-220-B NRG Power Marketing, Inc Order authorizing Power Marketing, Inc to export electric energy to Canada. EA-220-B NRG Power Marketing, Inc More...

473

EA-122-A Dynegy Power Marketing, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Dynegy Power Marketing, Inc EA-122-A Dynegy Power Marketing, Inc Order authorizing Dynegy Power Marketing, Inc to export electric energy to Canada. EA-122-A Dynegy Power...

474

EA-121-B Dynegy Power Marketing, Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B Dynegy Power Marketing, Inc EA-121-B Dynegy Power Marketing, Inc Order authorizing Dynegy Power Marketing, Inc to export electric energy to Mexico. EA-121-B Dynegy Power...

475

West's Energy Woes Threaten Salmon Runs  

Science Journals Connector (OSTI)

...energy crisis forced the Bonneville Power Administration (BPA), the region's...energy crisis forced the Bonneville Power Administration, the region's energy...energy crisis forced the Bonneville Power Administration (BPA), the region's...

Robert F. Service

2001-02-23T23:59:59.000Z

476

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network (OSTI)

, the Bonneville Power Administration (Bonneville) began to shift responsibility for financing and acquiring Power Administration. The existing charter, however, lacked a quorum requirement and is silent, in 1996 Congress directed Bonneville and the Northwest Power Planning Council (Council) to convene

477

Renewables Test IQ of the Grid  

Science Journals Connector (OSTI)

...energy received by the Bonneville Power Administration reached nearly 2000 MW...OF ENERGY; SOURCE: BONNEVILLE POWER ADMINISTRATION A study that General...also in the works. The Bonneville Power Administration, a federal agency based...

Dan Charles

2009-04-10T23:59:59.000Z

478

"1. Browns Ferry","Nuclear","Tennessee Valley Authority",3309  

U.S. Energy Information Administration (EIA) Indexed Site

Alabama" Alabama" "1. Browns Ferry","Nuclear","Tennessee Valley Authority",3309 "2. James H Miller Jr","Coal","Alabama Power Co",2675 "3. Barry","Coal","Alabama Power Co",2575 "4. E C Gaston","Coal","Alabama Power Co",1878 "5. H Allen Franklin Combined Cycle","Gas","Southern Power Co",1815 "6. Joseph M Farley","Nuclear","Alabama Power Co",1734 "7. Widows Creek","Coal","Tennessee Valley Authority",1604 "8. Colbert","Coal","Tennessee Valley Authority",1574 "9. E B Harris Electric Generating Plant","Gas","Southern Power Co",1269

479

COMPUTER USE AUTHORIZATION ASTRONOMY DEPARTMENT  

E-Print Network (OSTI)

COMPUTER USE AUTHORIZATION ASTRONOMY DEPARTMENT RADIO ASTRONOMY LABORATORY THEORETICALASTROPHYSICS authorized to support charges for the computer account. Please give the completed form to Bill Boyd in 401: ____________________________ User I.D.: ________________________ CONDITIONS OF USE The Astronomy Department provides computing

Militzer, Burkhard

480

High Altitude Wind Power Systems: A Survey on Flexible Power Kites Mariam Ahmed*  

E-Print Network (OSTI)

High Altitude Wind Power Systems: A Survey on Flexible Power Kites Mariam Ahmed* Grenoble wind power using a kite-based system, and the proposed structures *Corresponding author Mariam.AHMED@g2

Boyer, Edmond

Note: This page contains sample records for the topic "bonneville power authority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Authorization of Line Extension (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Authorization of Line Extension (Nebraska) Authorization of Line Extension (Nebraska) Authorization of Line Extension (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Line Extension Analysis Provider Nebraska Public Power District Any entity permitted to establish an electric light and power plant, and/or

482

Author's personal copy Journal of Power Sources 196 (2011) 30893094  

E-Print Network (OSTI)

-substituted (La,Sr)CrO3-i�Ce0.9Gd0.1O2-i solid oxide fuel cell anodes exhibiting regenerative behavior David M anode Palladium Perovskite Catalyst a b s t r a c t Composite anodes consisting of Pd-substituted (La fuel cells at 800 C with humidified H2 fuel. Low anode polarization resistance was observed during

Marks, Laurence D.

483

Author's personal copy Journal of Power Sources 196 (2011) 92139219  

E-Print Network (OSTI)

of carbon fiber brush loading in anodes on startup and performance of microbial fuel cells Adam J: Microbial fuel cell Carbon fiber brush anodes Internal resistance Electrochemical impedance spectroscopy a b s t r a c t Flat carbon anodes placed near a cathode in a microbial fuel cell (MFC) are adversely

484

Power measurements in fusion reactors Author: Aljaz Cufar  

E-Print Network (OSTI)

and solar energy will solve our energy problems and satisfy the above conditions, but according to some for energy is increasing. Today's energy sources should at least in principle satisfy the following and availability independent of weather conditions. Some people suggest that renewable energy sources like wind

?umer, Slobodan

485

Workplace Charging Challenge Partner: New York Power Authority...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

has installed three charging stations strictly for employee use at the main office in White Plains, NY. Each charger has been equipped with a meter attached in order to capture...

486

INDUSTRY  

Science Journals Connector (OSTI)

Bonneville Power Administration will supply additional power requirements on an interruptible basis. ...

1952-03-24T23:59:59.000Z

487

Export Authorizations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-101-B Avista 051203 EA-105-A NorAm Energy Services 082198 EA-115 Enron Power Marketing 092696 EA-115-A Enron Power Marketing 091798 EA-122-A Electric Clearinghouse 10...

488

c) UNBUNDLING.- Any stranded cost recovery charge authorized by the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

c) UNBUNDLING.- Any stranded cost recovery charge authorized by the c) UNBUNDLING.- Any stranded cost recovery charge authorized by the Commission to be assessed by the Tennessee Valley Authority shall be unbundled from the otherwise applicable rates and charges to such customer and separately stated on the bill of such customer. The Tennessee Valley Authority shall not recover wholesale stranded costs from any customer through any other rate, charge, or mechanism. (d) REPORT.-Beginning in fiscal year 2001, as part of the annual management report submitted by the Tennessee Valley Authority to Congress, the Tennessee Valley Authority shall also specifically report: (1) the status of the Tennessee Valley Authority's long-range financial plans and the progress toward its goal of competitively priced electric power, and a general discussion of the Tennessee

489

Western Business Rountable: Coordination of Federal Authorizations for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Business Rountable: Coordination of Federal Authorizations Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities The Western Business Roundtable ("Roundtable") respectfully submits the following comments relating to the U.S. Department of Energy's (DOE) request for public comments regarding implementation of its transmission siting obligations under Section 216(h) of the Federal Power Act. Western Business Rountable: Coordination of Federal Authorizations for Electric Transmission Facilities More Documents & Publications Comments Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal

490

Public Service Commission Authorization to Utilize an Alternative Method of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Service Commission Authorization to Utilize an Alternative Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Mississippi Program Type Green Power Purchasing Industry Recruitment/Support Performance-Based Incentive Public Benefits Fund Provider Public Service Commission The Senate Bill 2793 authorizes the Public Service Commission (PSC) to

491

CX-008683: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07112012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new VHFUHF radio system on the existing...

492

CX-010589: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07012013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a 60-foot communications tower and...

493

CX-008163: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03282012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to allow Portland General Electric a 1-mile long, 20-foot...

494

CX-008695: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06212012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to build a 30,000 square foot (sf) expansion to the east...

495

Clark Fork River Delta Restoration Project 1 Finding of No Significant...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Clark Fork River Delta Restoration Project Finding of No Significant Impact Bonneville Power Administration DOEEA-1969 July 2014 SUMMARY Bonneville Power Administration (BPA)...

496

2008 ASC Methodology Errata  

NLE Websites -- All DOE Office Websites (Extended Search)

- BONNEVILLE POWER ADMINISTRATION'S ERRATA CORRECTIONS BONNEVILLE POWER ADMINISTRATION'S ERRATA CORRECTIONS TO THE 2008 AVERAGE SYSTEM COST METHODOLOGY September 12, 2008 I....

497

EIS-0183: Supplement to Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Policy of Bonneville Power Administration on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 BPA...

498

Microsoft Word - DSI_Lookback_DROD_6-08-10_Final _signature_...  

NLE Websites -- All DOE Office Websites (Extended Search)

Administrator's Draft Record of Decision On Issues Remanded to Bonneville Power Administration in Pacific Northwest Generating Cooperative, et al., v. Bonneville Power...

499

CX-008710: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applied: A2 Date: 05232012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to amend its existing 2009...

500

CX-008892: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applied: A2 Date: 07232012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to execute one or more...