Powered by Deep Web Technologies
Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

GRR/Section 12-FD-a - Migratory Bird Permit | Open Energy Information  

Open Energy Info (EERE)

a - Migratory Bird Permit a - Migratory Bird Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-FD-a - Migratory Bird Permit 12FDAMigratoryBirdPermit.pdf Click to View Fullscreen Contact Agencies Fish and Wildlife Service Regulations & Policies Migratory Bird Treaty Act of 1918, as amended, 16 U.S.C. § 703 50 CFR 21 Migratory Bird Permits Triggers None specified Click "Edit With Form" above to add content 12FDAMigratoryBirdPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Migratory birds should be addressed in every NEPA document that analyzes actions that may have the potential to adversely impact migratory bird

2

Major developments in section 404-permitting  

Science Conference Proceedings (OSTI)

Mountain coal mining in the Central Appalachians faces increased challenge under the Clean Water Act (CWA). These challenges have included the US Environmental Protection Agency's (EPA) increased involvement in permitting under Section 404 of the CWA; active opposition by environmental groups to Section 404 permits; and proposed federal legislation to reduce the availability of these permits. These recent challenges culminated in a June 11, 2009, Memorandum of Understanding (MoU) between the PEA, the Department of Interior (DoI) and the Army Corps of Engineers (Corps) that will limit the use of general permits for mountaintop coal mining and increase the scrutiny applied to individual permits, while also providing a coordinated approach for reviewing the backlog of pending permit application. By entering into the MoU, the federal agencies aim to reduce the environmental impacts of mountaintop coal mining while increasing certainty and transparency for permit applications. Challenges to Section 404 permitting for mountaintop coal mining are dynamic and new developments occur almost daily. This article provides a snapshot of the current climate.

Ahrens, M.; Orr, S. [Lathan & Watkins LLP (United States)

2009-06-15T23:59:59.000Z

3

GRR/Section 15-CO-a - Air Permit - Construction Permit | Open Energy  

Open Energy Info (EERE)

5-CO-a - Air Permit - Construction Permit 5-CO-a - Air Permit - Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CO-a - Air Permit - Construction Permit 15COAAirPermitConstructionPermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies 5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements Triggers None specified Click "Edit With Form" above to add content 15COAAirPermitConstructionPermit.pdf 15COAAirPermitConstructionPermit.pdf 15COAAirPermitConstructionPermit.pdf Error creating thumbnail: Page number not in range. Flowchart Narrative The Colorado Department of Public Health and Environment (CDPHE) Air

4

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit | Open  

Open Energy Info (EERE)

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-b - Air Quality Permit - Tier II Operating Permit 15IDBAirQualityPermitTierIIOperatingPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDBAirQualityPermitTierIIOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Tier II Operating Permits are issued to facilities or stationary sources

5

GRR/Section 15-ID-a - Air Quality Permit - Permit to Construct | Open  

Open Energy Info (EERE)

15-ID-a - Air Quality Permit - Permit to Construct 15-ID-a - Air Quality Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-a - Air Quality Permit - Permit to Construct 15IDAAirQualityPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDAAirQualityPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires an air quality

6

GRR/Section 15-CA-b - Air Permit - Operating Permit | Open Energy  

Open Energy Info (EERE)

15-CA-b - Air Permit - Operating Permit 15-CA-b - Air Permit - Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CA-b - Air Permit - Operating Permit 15CABAirPermitOperatingPermit.pdf Click to View Fullscreen Contact Agencies California Air Resources Board Regulations & Policies Clean Air Act (42 USC 1857 et seq.) California Air Pollution Control Laws Triggers None specified Click "Edit With Form" above to add content 15CABAirPermitOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer operating a facility that emits air pollutants must obtain an

7

GRR/Section 15-TX-a - Air Permit - Permit to Construct | Open Energy  

Open Energy Info (EERE)

GRR/Section 15-TX-a - Air Permit - Permit to Construct GRR/Section 15-TX-a - Air Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-TX-a - Air Permit - Permit to Construct 15TXAAirPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Regulations & Policies Title 30 of the Texas Administrative Code 30 TAC 116.114 30 TAC 39.418 30 TAC 39.604 30 TAC 39.605 30 TAC 39.409 30 TAC 116.136 30 TAC 55.254 30 TAC 116.136 30 TAC 116.137 Triggers None specified Click "Edit With Form" above to add content 15TXAAirPermitPermitToConstruct (1).pdf 15TXAAirPermitPermitToConstruct (1).pdf 15TXAAirPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range.

8

GRR/Section 7-NV-a - Permit to Construct and Permit to Operate | Open  

Open Energy Info (EERE)

7-NV-a - Permit to Construct and Permit to Operate 7-NV-a - Permit to Construct and Permit to Operate < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-NV-a - Permit to Construct and Permit to Operate 07NVAPermitToConstructAndPermitToOperate (3).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Triggers None specified Click "Edit With Form" above to add content 07NVAPermitToConstructAndPermitToOperate (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 7-NV-a.1 and 6-NV-a.2 - Has an Environmental Review been Completed for Construction? The developer must make sure to undergo an environmental process before

9

GRR/Section 6 - Construction Permits Overview | Open Energy Information  

Open Energy Info (EERE)

6 - Construction Permits Overview 6 - Construction Permits Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6 - Construction Permits Overview 06 - ConstructionPermitsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06 - ConstructionPermitsOverview.pdf 06 - ConstructionPermitsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Constructing a geothermal power plant requires numerous permits from Federal, state, and local governments, related to transporting construction materials, encroaching upon Federal and state right-of-ways, demolishing existing structures and building new structures.

10

GRR/Section 12-FD-d - ESA Section 10 Take Permit | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 12-FD-d - ESA Section 10 Take Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-FD-d - ESA Section 10 Take Permit 12FDDESASection10TakePermit.pdf Click to View Fullscreen Contact Agencies Fish and Wildlife Service National Marine Fisheries Service Regulations & Policies Endangered Species Act National Environmental Policy Act Triggers None specified Click "Edit With Form" above to add content 12FDDESASection10TakePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

11

Section 404 permitting in coastal Texas from 1996 - 2003: patterns and effects on streamflow  

E-Print Network (OSTI)

This study explores the spatial-temporal patterns of Section 404 permitting program under the Clean Water Act and examines its impact on mean and peak annual streamflow. The study area consists of 47 sub-basins that are delineated based on USGS streamflow gauges. These sub-basins span from the southern portion of coastal Texas to the easternmost portion of coastal Texas. Descriptive, spatial and spatial-temporal statistical methods are used to explore patterns in Section 404 permitting between 1996 and 2003. The effects of Section 404 permit types on mean and peak annual streamflow over the same 8 year period are also statistically modeled with a host of other relevant control variables. Exploratory analyses of Section 404 permits demonstrated characteristics that were indicative of suburban and, to a larger extent, exurban development. Explanatory analyses of the effects of Section 404 permitting on mean and peak streamflow showed that Section 404 permits increase both measures. These increases were minimal on a per-permit basis but have the ability to accumulate over time and result in much larger increases. Section 404 permits also displayed an ordered effect based on the permit type. Permit types that represent larger impacts had larger effects. The effects of permits of streamflow followed a descending pattern of Individual permits, Letters of Permission, Nationwide permits, and General permits. This type of permit impact supports the use of this measure as an indicator of wetland impact and loss and corroborates previous studies that have incorporated this measure.

Highfield, Wesley E.

2008-08-01T23:59:59.000Z

12

Permits  

NLE Websites -- All DOE Office Websites (Extended Search)

Other Permits Permits We are committed to meeting our environmental requirements for air, waste, and water quality permitting. Contact Environmental Communication & Public...

13

GRR/Section 18-ID-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-b - Hazardous Waste Permit Process GRR/Section 18-ID-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-b - Hazardous Waste Permit Process 18IDBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies Idaho Hazardous Waste Management Act IDAPA 58.01.05 Rules and Standards for Hazardous Waste 40 CFR 124.31 Pre-application public meeting and notice 40 CRF 124.10 Public notice of permit actions and public comment period 40 CFR 124.12 Public hearings 40 CFR 270.13 Contents of Part A of the permit application Triggers None specified Click "Edit With Form" above to add content 18IDBHazardousWastePermitProcess.pdf 18IDBHazardousWastePermitProcess.pdf

14

GRR/Section 14-UT-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-UT-c - Underground Injection Control Permit GRR/Section 14-UT-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-UT-c - Underground Injection Control Permit 14UTCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies Utah Administrative Code R317-7 Triggers None specified Click "Edit With Form" above to add content Potential Roadblocks If the permit application does not adequately demonstrate that geothermal re-injection wells will be constructed and operated to be protective of any USDWs the issuance of a permit may be denied or delayed. 14UTCUndergroundInjectionControlPermit.pdf 14UTCUndergroundInjectionControlPermit.pdf

15

GRR/Section 14-FD-a - Dredge & Fill Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-FD-a - Dredge & Fill Permit GRR/Section 14-FD-a - Dredge & Fill Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-FD-a - Dredge & Fill Permit 14FDADredgeFillOfWetlandsPermitting.pdf Click to View Fullscreen Contact Agencies U S Army Corps of Engineers United States Environmental Protection Agency Regulations & Policies Clean Water Act 33 CFR 323: Permits for Discharges of Dredged or Fill Material 33 CFR 325: Processing Dept. of Army Permits 33 CFR 327: Public Hearings Triggers None specified The Clean Water Act contains a "no net loss" policy for wetlands. If the proposed project involves the dredge or fill of any wetlands, Section 404 of the Clean Water Act requires that the project obtain a permit from the U

16

GRR/Section 15-WA-a - Air Quality Notice of Construction Permit | Open  

Open Energy Info (EERE)

5-WA-a - Air Quality Notice of Construction Permit 5-WA-a - Air Quality Notice of Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-a - Air Quality Notice of Construction Permit 15-WA-a - Air Quality Notice of Construction Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-400-110 WAC 173-400-111 WAC 173-400-171 Triggers None specified This flowchart illustrates the process for obtaining an Air Quality Notice of Construction Permit. The Washington State Department of Ecology (WSDE) oversees the permitting process under WAC 173-400. 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf

17

GRR/Section 14-HI-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-HI-c - Underground Injection Control Permit GRR/Section 14-HI-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-HI-c - Underground Injection Control Permit 14HIC - UndergroundInjectionControlPermit (1).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Safe Drinking Water Branch Regulations & Policies Hawaii Administrative Rules Title 11, Chapter 23 Triggers None specified Click "Edit With Form" above to add content 14HIC - UndergroundInjectionControlPermit (1).pdf 14HIC - UndergroundInjectionControlPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The developer must receive an Underground Injection Control Permit from the

18

GRR/Section 15-MT-a - Air Quality Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 15-MT-a - Air Quality Permit GRR/Section 15-MT-a - Air Quality Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-MT-a - Air Quality Permit 15MTAAirQualityPermit (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Code Annotated 75-2 Administrative Rules of Montana 17.8 Triggers None specified Click "Edit With Form" above to add content 15MTAAirQualityPermit (1).pdf 15MTAAirQualityPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Montana Department of Environmental Quality (DEQ) requires a Montana Air Permit to construct and operate a new or modified source of air

19

GRR/Section 6-OR-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-OR-a - Transportation Permit GRR/Section 6-OR-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-OR-a - Transportation Permit 06ORATransportationPermit.pdf Click to View Fullscreen Contact Agencies Oregon Department of Transportation Regulations & Policies ORS 818: Vehicle Limits Triggers None specified Click "Edit With Form" above to add content 06ORATransportationPermit.pdf 06ORATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 6-OR-a.1 - Does the Project Require the Transportation of an Oversize or Overweight Load? The developer will only need to secure a permit for an oversize or

20

GRR/Section 15-AK-b - Air Quality Minor Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 15-AK-b - Air Quality Minor Permit GRR/Section 15-AK-b - Air Quality Minor Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-AK-b - Air Quality Minor Permit 15AKBAirQualityMinorPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation Regulations & Policies Alaska Statutes Alaska Administrative Code 18 AAC 50 Air Quality Control Regulations 40 CFR Chapter I, Subchapter C - Air Programs Triggers None specified Click "Edit With Form" above to add content 15AKBAirQualityMinorPermit.pdf 15AKBAirQualityMinorPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The mission of the Air Permit Program is to protect the Alaskan environment

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

GRR/Section 19-TX-c - Surface Water Permit | Open Energy Information  

Open Energy Info (EERE)

19-TX-c - Surface Water Permit 19-TX-c - Surface Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-TX-c - Surface Water Permit 19TXCSurfaceWaterPermit.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Regulations & Policies Tex. Water Code § 11 30 TAC 295 30 TAC 297 Triggers None specified Click "Edit With Form" above to add content 19TXCSurfaceWaterPermit.pdf 19TXCSurfaceWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Texas, the Texas Commission on Environmental Quality (TCEQ) issues surface water permits. Under, Tex. Water Code § 11, surface water permits

22

GRR/Section 6-TX-b - Construction Storm Water Permitting Process | Open  

Open Energy Info (EERE)

6-TX-b - Construction Storm Water Permitting Process 6-TX-b - Construction Storm Water Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-TX-b - Construction Storm Water Permitting Process 06TXBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality EPA Regulations & Policies TPDES Construction General Permit (TXR150000) 30 Texas Administrative Code 205 General Permits for Waste Discharges Texas Water Code 26.040 General Permits Clean Water Act Triggers None specified Click "Edit With Form" above to add content 06TXBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

23

GRR/Section 7-HI-a - Geothermal and Cable System Development Permit | Open  

Open Energy Info (EERE)

GRR/Section 7-HI-a - Geothermal and Cable System Development Permit GRR/Section 7-HI-a - Geothermal and Cable System Development Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-HI-a - Geothermal and Cable System Development Permit 07HIAGeothermalAndCableSystemDevelopmentPermitting.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Engineering Division Regulations & Policies Hawaii Revised Statute 196D Hawaii Administrative Rules 13-185 Hawaii Revised Statute 205-3.1 Revised Statute 205-5. Triggers None specified Click "Edit With Form" above to add content 07HIAGeothermalAndCableSystemDevelopmentPermitting.pdf 07HIAGeothermalAndCableSystemDevelopmentPermitting.pdf Error creating thumbnail: Page number not in range.

24

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process  

Open Energy Info (EERE)

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-c - Designated Ground Water Basin Well Permitting Process 19COCDesignatedGroundWaterBasinWellPermit.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Colorado Ground Water Commission Regulations & Policies CRS 37-90-107 CRS 37-90-108 Ground Water Management District Rules 2 CCR 410-1 - Rules and Regulations for the Management and Control of Designated Ground Water Basins Triggers None specified Click "Edit With Form" above to add content 19COCDesignatedGroundWaterBasinWellPermit.pdf 19COCDesignatedGroundWaterBasinWellPermit.pdf

25

GRR/Section 12-WA-a - Live Wildlife Taking Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 12-WA-a - Live Wildlife Taking Permit GRR/Section 12-WA-a - Live Wildlife Taking Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-WA-a - Live Wildlife Taking Permit 12-WA-a - Live Wildlife Taking Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Fish and Wildlife Regulations & Policies WAC 232-12-064 Triggers None specified In Washington, it is unlawful to take wildlife from the wild without permission from the Washington State Department of Fish and Wildlife (WDFW). The WDFW issues Live Wildlife Taking Permits under WAC 232-12-064. 12-WA-a - Live Wildlife Taking Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

26

GRR/Section 3-HI-d - Use and Occupancy Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-HI-d - Use and Occupancy Permit GRR/Section 3-HI-d - Use and Occupancy Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-d - Use and Occupancy Permit 03HIDUseAndOccupancyPermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Highways Division Regulations & Policies Hawaii Administrative Rules Title 19, Chapter 102 Hawaii Administrative Rules Title 19, Chapter 105 Triggers None specified Click "Edit With Form" above to add content 03HIDUseAndOccupancyPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer needs a Use and Occupancy Permit from the Hawaii Department of

27

GRR/Section 17-HI-a - Noise Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 17-HI-a - Noise Permit GRR/Section 17-HI-a - Noise Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 17-HI-a - Noise Permit 17HIANoisePermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Indoor and Radiological Health Branch Regulations & Policies Hawaii Administrative Regulations Title 11, Chapter 46 Triggers None specified Click "Edit With Form" above to add content 17HIANoisePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer may need to obtain a Noise Permit from the Hawaii Department of Health Indoor and Radiological Health Branch to engage in construction,

28

GRR/Section 15-CA-a - Air Permit - Authority to Construct | Open Energy  

Open Energy Info (EERE)

GRR/Section 15-CA-a - Air Permit - Authority to Construct GRR/Section 15-CA-a - Air Permit - Authority to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CA-a - Air Permit - Authority to Construct 15CAAAirPermitAuthorityToConstruct (1).pdf Click to View Fullscreen Contact Agencies California Air Resources Board Regulations & Policies Clean Air Act (42 USC 1857 et seq.) California Air Pollution Control Laws Triggers None specified Click "Edit With Form" above to add content 15CAAAirPermitAuthorityToConstruct (1).pdf 15CAAAirPermitAuthorityToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer seeking to construct, modify, or operate a facility or

29

GRR/Section 14-OR-e - Water Pollution Control Facility Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-OR-e - Water Pollution Control Facility Permit GRR/Section 14-OR-e - Water Pollution Control Facility Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-OR-e - Water Pollution Control Facility Permit 14OREWaterPollutionControlFacilityPermit.pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Regulations & Policies OAR Division 45 Regulations Pertaining to NPDES and WPCF Permits Triggers None specified Click "Edit With Form" above to add content 14OREWaterPollutionControlFacilityPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Oregon Department of Environmental Quality (ODEQ) issues Water

30

GRR/Section 18-CO-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-CO-b - Hazardous Waste Permit Process GRR/Section 18-CO-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CO-b - Hazardous Waste Permit Process 18COBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Hazardous Waste Regulations Part 260 Triggers None specified Click "Edit With Form" above to add content 18COBHazardousWastePermitProcess.pdf 18COBHazardousWastePermitProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Hazardous waste is a regulated substance and facilities that treat, store

31

GRR/Section 3-WA-c - Utility Franchise or Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-WA-c - Utility Franchise or Permit Process GRR/Section 3-WA-c - Utility Franchise or Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-c - Utility Franchise or Permit Process 3-WA-c - Utility Franchise or Permit Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Department of Transportation Regulations & Policies WAC 468-34-060 WAC 468-34-080 WAC 468-34-110 WAC 468-34-160 WAC 468-34-170 Triggers None specified This flowchart illustrates the process of obtaining a franchise or permit through a state highway right of way in Washington State. A utility permit or franchise is required for occupancy of a highway right of way by utility facilities, including private lines. WAC 468-34-160. The process is

32

GRR/Section 3-MT-e - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-MT-e - Encroachment Permit GRR/Section 3-MT-e - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-e - Encroachment Permit 03MTEEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Montana Department of Transportation Triggers None specified Click "Edit With Form" above to add content 03MTEEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart is intended to address the permitting requirements for encroachments on Montana Department of Transportation lands.

33

GRR/Section 6-HI-e - Boiler Pressure Vessel Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 6-HI-e - Boiler Pressure Vessel Permit GRR/Section 6-HI-e - Boiler Pressure Vessel Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-HI-e - Boiler Pressure Vessel Permit 06HIGBoilerPressureVesselPermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Labor and Industrial Relations Occupational Safety and Health Division Regulations & Policies Boiler and Pressure Vessel Regulations Triggers None specified Click "Edit With Form" above to add content 06HIGBoilerPressureVesselPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Boiler/Pressure Vessel Permit

34

GRR/Section 14-NV-e - Groundwater Discharge Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-NV-e - Groundwater Discharge Permit GRR/Section 14-NV-e - Groundwater Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-e - Groundwater Discharge Permit 14NVEGroundwaterDischargePermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies NAC 445A NRS 445A Triggers None specified Click "Edit With Form" above to add content 14NVEGroundwaterDischargePermit.pdf 14NVEGroundwaterDischargePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Environmental Protection (NDEP) Bureau of Water Pollution Control is responsible for protecting Nevada water quality from

35

GRR/Section 14-TX-e - Ground Water Discharge Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-TX-e - Ground Water Discharge Permit GRR/Section 14-TX-e - Ground Water Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-TX-e - Ground Water Discharge Permit 14TXEGroundWaterDischargePermit (1).pdf Click to View Fullscreen Contact Agencies Railroad Commission of Texas United States Environmental Protection Agency Regulations & Policies 16 TAC 3.8 (Rule 8) Triggers None specified Click "Edit With Form" above to add content 14TXEGroundWaterDischargePermit (1).pdf 14TXEGroundWaterDischargePermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Pits are used in drilling operations to contain drilling related fluids and

36

GRR/Section 19-CO-b - Denver Basin Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-CO-b - Denver Basin Permitting Process GRR/Section 19-CO-b - Denver Basin Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-b - Denver Basin Permitting Process 19COBDenverBasinPermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Regulations & Policies CRS 37-90-103 Underground Water Definitions CRS 37-90-137 Permits to Construct Wells Outside Designated Basins CRS 37-92-302 Application for Water Rights or Change of Such Water Rights 2 CCR 402-6 The Denver Basin Rules Triggers None specified Click "Edit With Form" above to add content 19COBDenverBasinPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

37

GRR/Section 18-MT-b - Hazardous Waste Facility Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-MT-b - Hazardous Waste Facility Permit GRR/Section 18-MT-b - Hazardous Waste Facility Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-MT-b - Hazardous Waste Facility Permit 18MTBHazardousWasteFacilityPermit.pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Code Annotated Title 75, Chapter 10, Part 4 Administrative Rules of Montana Title 17, Chapter 53 40 CFR 260 through 40 CFR 270 40 CFR 124 Triggers None specified Click "Edit With Form" above to add content 18MTBHazardousWasteFacilityPermit.pdf 18MTBHazardousWasteFacilityPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

38

GRR/Section 6-ID-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-ID-a - Transportation Permit GRR/Section 6-ID-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-a - Transportation Permit 06IDATransportationPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.21 Triggers None specified Click "Edit With Form" above to add content 06IDATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Overlegal permits are issued to protect the "safety and convenience of the general public." The Idaho Transportation Department is also concerned with

39

GRR/Section 3-HI-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-HI-c - Encroachment Permit GRR/Section 3-HI-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-c - Encroachment Permit 03HICEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Highways Division Hawaii Department of Transportation Harbors Divsion Triggers None specified Click "Edit With Form" above to add content 03HICEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 3-HI-c.1 to 3-HI-c.3 - Will the project perform construction adjacent to and within a highway right-of-way and/or park on a restricted section of

40

GRR/Section 3-ID-d - Land Use Permit | Open Energy Information  

Open Energy Info (EERE)

d - Land Use Permit d - Land Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-d - Land Use Permit 03-ID-d - Land Use Permit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Lands Triggers None specified Click "Edit With Form" above to add content 03-ID-d - Land Use Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Lands issues Land Use Permits for non-invasive exploration on a case by case basis. 3-ID-d.1 to 3-ID-d.2 - Will Non-Invasive Exploration Be Preformed on State Lands? A Land Use Permit is required to preform non-invasive exploration on state

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

GRR/Section 6-ID-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-ID-b - Construction Storm Water Permit 6-ID-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-ID-b - Construction Storm Water Permit 06IDBConstructionStormwaterPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 06IDBConstructionStormwaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 6-ID-b.1 - EPA Construction General Permit Idaho does not have authority from the United States Environmental Protection Agency to issue a construction storm water permit. See Flowchart

42

GRR/Section 15-UT-a - Utah Air Permit Approval Order | Open Energy  

Open Energy Info (EERE)

5-UT-a - Utah Air Permit Approval Order 5-UT-a - Utah Air Permit Approval Order < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-UT-a - Utah Air Permit Approval Order 15UTAUtahAirPermitApprovalOrder.pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies UAC R307-300 UAC R307-400 Triggers None specified Click "Edit With Form" above to add content 15UTAUtahAirPermitApprovalOrder.pdf 15UTAUtahAirPermitApprovalOrder.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Utah Department of Environmental Quality Division of Air Quality (DEQ) issues permits for operations that emit contaminants into the air. Most new

43

GRR/Section 6-UT-b - Storm Water Permit | Open Energy Information  

Open Energy Info (EERE)

6-UT-b - Storm Water Permit 6-UT-b - Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-UT-b - Storm Water Permit 06UTBStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Utah Division of Water Quality Regulations & Policies Utah Water Quality Act Clean Water Act Triggers None specified Click "Edit With Form" above to add content 06UTBStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The construction storm water permit process is required to prevent storm water pollution. The permits are administered by the Utah Division of Water

44

GRR/Section 18-ID-c - Wastewater Pretreatment Permit | Open Energy  

Open Energy Info (EERE)

8-ID-c - Wastewater Pretreatment Permit 8-ID-c - Wastewater Pretreatment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-c - Wastewater Pretreatment Permit 18IDCWastewaterPretreatmentPermit.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 18IDCWastewaterPretreatmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Industrial wastewater permits are issued at the local level. If wastewater is not discharged into a municipal sewer system, the nonpoint source and NPDES permit inquiries are sufficient. A common approach to wastewater treatment is to treat on-site. See Idaho's

45

GRR/Section 6-CO-a - Extra-Legal Vehicle Permitting Process | Open Energy  

Open Energy Info (EERE)

6-CO-a - Extra-Legal Vehicle Permitting Process 6-CO-a - Extra-Legal Vehicle Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-CO-a - Extra-Legal Vehicle Permitting Process 06COAExtraLegalVehiclePermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Department of Transportation Regulations & Policies Rules and Regulations of the Colorado Department of Transportation Pertaining to Transport Permits for the Movement of Extra-Legal Vehicles or Loads C.R.S § 42-4-505: Longer Vehicle Combinations C.R.S § 42-4-510: Permits for Excess Size and Weight Triggers None specified Click "Edit With Form" above to add content 06COAExtraLegalVehiclePermittingProcess.pdf Error creating thumbnail: Page number not in range.

46

GRR/Section 3-ID-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

3-ID-c - Encroachment Permit 3-ID-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-ID-c - Encroachment Permit 03IDCEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Idaho Transportation Department Regulations & Policies IDAPA 39.03.42 Triggers None specified Click "Edit With Form" above to add content 03IDCEncroachmentPermit.pdf 03IDCEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer needs an Encroachment Permit from the Idaho Transportation Department (ITD) to add, modify, relocate, maintain, or remove an encroachment on the state highway or within the state highway rights-of way

47

GRR/Section 3-CA-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

CA-c - Encroachment Permit CA-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-CA-c - Encroachment Permit 03CACEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies California Department of Transportation Regulations & Policies California Streets and Highways Code California Streets and Highways Code 660(b) California Streets and Highways Code 670(a)(2) and 671.5(a) California Encroachment Permits Manual California Encroachment Permits Manual Chapter 2 Triggers None specified Click "Edit With Form" above to add content 03CACEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

48

GRR/Section 15-WA-b - Air Operating Permit | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 15-WA-b - Air Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-b - Air Operating Permit 15-WA-b - Air Operating Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-401-500 WAC 173-401-800 WAC 173-401-810 WAC 173-401-735 WAC 173-401-610 Triggers None specified This flowchart illustrates the process for obtaining an Air Operating Permit in Washington State. The Washington State Department of Ecology (WSDE) issues Air Operating Permit under WAC 173-401. An Air Operating Permit is required if a facility has the potential to emit

49

GRR/Section 6-NV-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-NV-a - Transportation Permit GRR/Section 6-NV-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-a - Transportation Permit 06NVATransportationPermit.pdf Click to View Fullscreen Contact Agencies Nevada Department of Transportation Nevada Department of Motor Vehicles Regulations & Policies Nevada Traffic Laws for Size Weight Load Triggers None specified Click "Edit With Form" above to add content 06NVATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Nevada Department of Transportation (NDOT) regulates the transport of oversized loads on Nevada's roads. NDOT regulates oversized loads in order

50

GRR/Section 18-CO-a - Underground Storage Tank Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-CO-a - Underground Storage Tank Permit GRR/Section 18-CO-a - Underground Storage Tank Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CO-a - Underground Storage Tank Permit 18COAUndergroundStorageTankPermit (1).pdf Click to View Fullscreen Contact Agencies Colorado Department of Labor and Employment Regulations & Policies Solid Waste Disposal Act 7 CCR 1101-14 Article 2 Underground Storage Tanks Triggers None specified Click "Edit With Form" above to add content 18COAUndergroundStorageTankPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The design, installation, registration, construction, and operation of

51

GRR/Section 14-UT-e - Ground Water Quality Protection Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-UT-e - Ground Water Quality Protection Permit GRR/Section 14-UT-e - Ground Water Quality Protection Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-UT-e - Ground Water Quality Protection Permit 14UTEGroundWaterQualityProtectionPermit.pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies UAC R317-6 Triggers None specified Click "Edit With Form" above to add content 14UTEGroundWaterQualityProtectionPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Utah Department of Environmental Quality (DEQ) regulates discharges

52

GRR/Section 17-MT-b - Montana Stream Protection Act (SPA 124 Permit) | Open  

Open Energy Info (EERE)

GRR/Section 17-MT-b - Montana Stream Protection Act (SPA 124 Permit) GRR/Section 17-MT-b - Montana Stream Protection Act (SPA 124 Permit) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 17-MT-b - Montana Stream Protection Act (SPA 124 Permit) 17MTBMontanaStreamProtectionActSPA124Permit.pdf Click to View Fullscreen Contact Agencies Montana Fish, Wildlife & Parks Regulations & Policies MCA 87-5-501 et seq Montana Stream Protection Triggers None specified Click "Edit With Form" above to add content 17MTBMontanaStreamProtectionActSPA124Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Montana has a policy to preserve fish and wildlife habitat as well as

53

GRR/Section 14-OR-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-OR-c - Underground Injection Control Permit GRR/Section 14-OR-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-OR-c - Underground Injection Control Permit 14ORCUndergroundInjectionControlPermit (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Regulations & Policies 40 CFR 144.26: Federal UIC Regulations 40 CFR 144.83: Notification OAR 340-044: State UIC Regulations Triggers None specified Click "Edit With Form" above to add content 14ORCUndergroundInjectionControlPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

54

GRR/Section 12-FD-b - Bald & Golden Eagle Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 12-FD-b - Bald & Golden Eagle Permit GRR/Section 12-FD-b - Bald & Golden Eagle Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-FD-b - Bald & Golden Eagle Permit 12FDBBaldGoldenEaglePermit.pdf Click to View Fullscreen Contact Agencies Fish and Wildlife Service Bureau of Land Management Regulations & Policies Bald and Golden Eagle Protection Act National Environmental Policy Act Triggers None specified Click "Edit With Form" above to add content 12FDBBaldGoldenEaglePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Bald and Golden Eagle Act prohibits anyone from "taking" bald eagles.

55

GRR/Section 19-HI-a - Surface Water Use Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 19-HI-a - Surface Water Use Permit GRR/Section 19-HI-a - Surface Water Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-HI-a - Surface Water Use Permit 19HIASurfaceWaterUsePermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Commission on Water Resource Management Regulations & Policies Hawaii Revised Statutes 174C Hawaii Administrative Rules Title 13, Chapter 171 Triggers None specified Click "Edit With Form" above to add content 19HIASurfaceWaterUsePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Under Hawaii Revised Statutes 174C and Hawaii Administrative Rules Title

56

GRR/Section 19-CO-d - Water Well Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 19-CO-d - Water Well Permit GRR/Section 19-CO-d - Water Well Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-d - Water Well Permit 19CODWaterWellPermit.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Regulations & Policies 2 CCR 402-7 Non-tributary Ground Water Rules Colorado Revised Stautes 37-90-137 Underground Water Triggers None specified Click "Edit With Form" above to add content 19CODWaterWellPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Colorado, by law every new well, not otherwise exempt, that diverts

57

GRR/Section 6-FD-a - Storm Water Construction General Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 6-FD-a - Storm Water Construction General Permit GRR/Section 6-FD-a - Storm Water Construction General Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-FD-a - Storm Water Construction General Permit 06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Regulations & Policies 40 CFR 122.26 Triggers None specified Click "Edit With Form" above to add content 06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The United States Environmental Protection Agency (EPA) issues a National

58

GRR/Section 6-MT-a - Montana Overdimensional or Overweight Load Permit |  

Open Energy Info (EERE)

GRR/Section 6-MT-a - Montana Overdimensional or Overweight Load Permit GRR/Section 6-MT-a - Montana Overdimensional or Overweight Load Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-MT-a - Montana Overdimensional or Overweight Load Permit 06MTAMontanaOverdimensionalOrOverweightLoadPermit (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Transportation Regulations & Policies Montana Code Annotated 61-10-101 et seq. Administrative Rules of Monatana 18.8 Triggers None specified Click "Edit With Form" above to add content 06MTAMontanaOverdimensionalOrOverweightLoadPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

59

GRR/Section 6-AK-b - Construction Storm Water Permitting | Open Energy  

Open Energy Info (EERE)

GRR/Section 6-AK-b - Construction Storm Water Permitting GRR/Section 6-AK-b - Construction Storm Water Permitting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-AK-b - Construction Storm Water Permitting 06AKBConstructionStormWaterPermitting (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation Regulations & Policies 18 AAC 72: Wastewater Treatment and Disposal Triggers None specified Click "Edit With Form" above to add content 06AKBConstructionStormWaterPermitting (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative From DEC Website: The goal of the Storm Water Program is to reduce or eliminate pollutants in

60

GRR/Section 15-AK-c - Title V Operating Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 15-AK-c - Title V Operating Permit GRR/Section 15-AK-c - Title V Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-AK-c - Title V Operating Permit 15AKCTitleVOperatingPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation United States Environmental Protection Agency Regulations & Policies Alaska Statutes Alaska Administrative Code 18 AAC 50 Air Quality Control Triggers None specified Click "Edit With Form" above to add content 15AKCTitleVOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative One of the major initiatives Congress added to the Clean Air Act in 1990 is

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

GRR/Section 6-NV-c - Drinking Water Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-NV-c - Drinking Water Permit GRR/Section 6-NV-c - Drinking Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-c - Drinking Water Permit 06NVCDrinkingWaterPermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Nevada Division of Environmental Protection Public Utilities Commission of Nevada Regulations & Policies NRS 445A Water Controls NAC 445A Water Controls (Regulations) Triggers None specified Click "Edit With Form" above to add content 06NVCDrinkingWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative According to NRS 445A, the Nevada Division of Water Resources is charged

62

GRR/Section 6-CA-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 6-CA-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-CA-a - Transportation Permit 06CAATransportationPermit.pdf Click to View Fullscreen Contact Agencies California Department of Transportation Regulations & Policies California Vehicle Code Section 35780 California Transportation Permits Manual Triggers None specified Click "Edit With Form" above to add content 06CAATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The California Department of Transportation (Caltrans) has discretionary

63

GRR/Section 14-WA-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-c - Underground Injection Control Permit GRR/Section 14-WA-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-c - Underground Injection Control Permit 14-WA-c - Underground Injection Control Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Chapter 173-218 WAC Non-endangerment Standard Triggers None specified The Safe Drinking Water Act requires Washington to implement technical criteria and standards to protect underground sources of drinking water from contamination. Under Chapter 173-218 WAC, the Washington State Department of Ecology (WSDE) regulates and permits underground injection control (UIC) wells in Washington. The Environmental Protection Agency

64

GRR/Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit  

Open Energy Info (EERE)

GRR/Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit GRR/Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-AK-b - Alaska Pollutant Discharge Elimination System Permit 14AKBAlaskaPollutantDischargeEliminationSystemPermit (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation United States Environmental Protection Agency Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 14AKBAlaskaPollutantDischargeEliminationSystemPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

65

GRR/Section 14-WA-b - State NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-b - State NPDES Permitting Process GRR/Section 14-WA-b - State NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-b - State NPDES Permitting Process 14-WA-b - State NPDES Permitting Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology United States Environmental Protection Agency Regulations & Policies Clean Water Act Chapter 90.48 RCW Chapter 173-216 WAC Triggers None specified Section 402 of the Clean Water Act (CWA) required the Environmental Protection Agency (EPA) to establish the National Pollutant Discharge Elimination System (NPDES) to regulate discharge of pollutants from point sources. In Washington, the EPA has delegated responsibility of NPDES to

66

GRR/Section 3-CO-d - Access Permit | Open Energy Information  

Open Energy Info (EERE)

CO-d - Access Permit CO-d - Access Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-CO-d - Access Permit 03CODAccessPermit (1).pdf Click to View Fullscreen Contact Agencies Colorado Department of Transportation Regulations & Policies State Highway Access Code Triggers None specified Click "Edit With Form" above to add content 03CODAccessPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative To construct, relocate, close, or modify access(es) to a State Highway or when there are changes in use of such access point(s), an application for access permit must be submitted to the Colorado Department of

67

GRR/Section 14-TX-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

TX-c - Underground Injection Control Permit TX-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-TX-c - Underground Injection Control Permit Pages from 14TXCUndergroundInjectionControlPermit (4).pdf Click to View Fullscreen Contact Agencies Railroad Commission of Texas Texas Commission on Environmental Quality Regulations & Policies Tex. Water Code § 27 16 TAC 3.9 46 TAC 3.46 16 TAC 3.30 - MOU between the RRC and the TCEQ Triggers None specified Click "Edit With Form" above to add content Pages from 14TXCUndergroundInjectionControlPermit (4).pdf Pages from 14TXCUndergroundInjectionControlPermit (4).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

68

GRR/Section 19-CO-h - Denver Basin and Designated Basin Permitting Process  

Open Energy Info (EERE)

9-CO-h - Denver Basin and Designated Basin Permitting Process 9-CO-h - Denver Basin and Designated Basin Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-h - Denver Basin and Designated Basin Permitting Process 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Ground Water Commission Colorado Division of Water Resources Regulations & Policies CRS 37-90-107 Application for Use of Ground Water 2 CCR 410-1 Rules and Regulations for the Management and Control of Designated Ground Water Triggers None specified Click "Edit With Form" above to add content 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf

69

GRR/Section 3-OR-c Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

OR-c Encroachment Permit OR-c Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-OR-c Encroachment Permit 3-OR-c Encroachment Permit.pdf Click to View Fullscreen Contact Agencies Oregon Department of Transportation Regulations & Policies OAR 734 - 51 OAR 734 - 55 Triggers None specified Click "Edit With Form" above to add content 3-OR-c Encroachment Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Oregon Department of Transportation ODOT issues permits for encroachments of state highway right of ways. Encroachments include the building of new approaches, the installation, maintenance, and operation of

70

GRR/Section 3-AK-e - Land Use Permit | Open Energy Information  

Open Energy Info (EERE)

3-AK-e - Land Use Permit 3-AK-e - Land Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-e - Land Use Permit 03AKELandUsePermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 03AKELandUsePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A land use permit in Alaska covers a number of uses of state land that are less invasive and do not require a full property interest such as a lease

71

GRR/Section 3-UT-g - Grant of Access Permit | Open Energy Information  

Open Energy Info (EERE)

3-UT-g - Grant of Access Permit 3-UT-g - Grant of Access Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-UT-g - Grant of Access Permit 03UTGGrantOfAccessPermit.pdf Click to View Fullscreen Contact Agencies Utah Department of Transportation Regulations & Policies R930-6 Triggers None specified Click "Edit With Form" above to add content 03UTGGrantOfAccessPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A grant of access permit is required from the Utah Department of Transportation whenever a new driveway, other curb cut, or local street connection is required on a State Highway. This applies to permission to

72

GRR/Section 3-CO-e - Utility or Special Use Permit | Open Energy  

Open Energy Info (EERE)

3-CO-e - Utility or Special Use Permit 3-CO-e - Utility or Special Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-CO-e - Utility or Special Use Permit 03COEUtilitySpecialUsePermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Transportation Regulations & Policies Rules and Regulations of the Colorado Department of Transportation Triggers None specified Click "Edit With Form" above to add content 03COEUtilitySpecialUsePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Utility owners must obtain a permit from the Colorado Department of Transportation prior to performing any utility accommodation work,

73

GRR/Section 6-OR-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

b - Construction Storm Water Permit b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-OR-b - Construction Storm Water Permit 06ORBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Triggers None specified Click "Edit With Form" above to add content 06ORBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A project may be eligible for "automatic coverage" under NPDES general permit 1200-CN if storm water does not discharge to a water body with a

74

GRR/Section 18-AK-c - Waste Disposal Permit Process | Open Energy  

Open Energy Info (EERE)

AK-c - Waste Disposal Permit Process AK-c - Waste Disposal Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-AK-c - Waste Disposal Permit Process 18AKC - WasteDisposalPermitProcess (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation Regulations & Policies AS 46.03.110 Waste Disposal Permit Regulations 18 AAC 60.200 et seq Triggers None specified Click "Edit With Form" above to add content 18AKC - WasteDisposalPermitProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Department of Environmental Conservation (DEC) is responsible

75

GRR/Section 18-OR-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

OR-b - Hazardous Waste Permit Process OR-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-OR-b - Hazardous Waste Permit Process 18ORBHazardousWastePermitProcess (1).pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Oregon Department of Environmental Quality Oregon Public Health Division Oregon Public Utility Commission Oregon Department of Fish and Wildlife Oregon Water Resources Department Regulations & Policies OAR 340-105: Management Facility Permits OAR 340-120: Hazardous Waste Management ORS 466: Storage, Treatment, and Disposal Triggers None specified Click "Edit With Form" above to add content 18ORBHazardousWastePermitProcess (1).pdf

76

GRR/Section 6-AK-c - Drinking Water Permit | Open Energy Information  

Open Energy Info (EERE)

6-AK-c - Drinking Water Permit 6-AK-c - Drinking Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-AK-c - Drinking Water Permit 06AKCDrinkingWaterPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation Regulations & Policies 18 AAC 80 Drinking Water 40 CFR 141 40 CFR 142 40 CFR 143 Triggers None specified Click "Edit With Form" above to add content 06AKCDrinkingWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Alaska's drinking water program is monitored under the Alaska Department of Environmental Conservation. The type of permit required depends on the

77

GRR/Section 14-CO-e - Ground Water Discharge Permit | Open Energy  

Open Energy Info (EERE)

CO-e - Ground Water Discharge Permit CO-e - Ground Water Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CO-e - Ground Water Discharge Permit 14COEGroundWaterDischargePermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Water Quality Control Act 5 CCR 1002-61 Colorado Discharge Permit System 5 CCR 1002-41 Basic Standards for Ground Water 5 CCR 1002-42 Site Specific Water Quality Standards for Ground Water Triggers None specified Click "Edit With Form" above to add content 14COEGroundWaterDischargePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

78

GRR/Section 15-HI-a - Air Pollution Control Permit | Open Energy  

Open Energy Info (EERE)

15-HI-a - Air Pollution Control Permit 15-HI-a - Air Pollution Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-HI-a - Air Pollution Control Permit 15HIAAirPollutionControlPermit (1).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Clean Air Branch United States Environmental Protection Agency Regulations & Policies Clean Air Act (42 U.S.C. 7401, et seq.) Hawaii Administrative Rules Title 11, Chapter 60.1 Triggers None specified Click "Edit With Form" above to add content 15HIAAirPollutionControlPermit (1).pdf 15HIAAirPollutionControlPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

79

GRR/Section 6-CO-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

6-CO-b - Construction Storm Water Permit 6-CO-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-CO-b - Construction Storm Water Permit 06COBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Water Quality Control Act 5 CCR 1002-61 Triggers None specified Click "Edit With Form" above to add content 06COBConstructionStormWaterPermit.pdf 06COBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Projects in Colorado with storm water discharges from construction activities that disturb one or more acres of land may require a Colorado

80

GRR/Section 13-HI-a - Conservation District Use Permit | Open Energy  

Open Energy Info (EERE)

3-HI-a - Conservation District Use Permit 3-HI-a - Conservation District Use Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 13-HI-a - Conservation District Use Permit 13HIAConservationDistrictUsePermit (2).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Office of Conservation and Coastal Lands Regulations & Policies Hawaii Administrative Rules Title 13, Chapter 5 Triggers None specified Click "Edit With Form" above to add content 13HIAConservationDistrictUsePermit (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer must apply for a Conservation District Use Permit with the

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

GRR/Section 18-NV-c - Waste Disposal Permit | Open Energy Information  

Open Energy Info (EERE)

NV-c - Waste Disposal Permit NV-c - Waste Disposal Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-NV-c - Waste Disposal Permit 18NVCWasteDisposalPermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 18NVCWasteDisposalPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Within the Nevada Division of Environmental Protection in Nevada, the Bureau of Waste Management (BWM) operates a permitting and compliance

82

GRR/Section 14-CO-b - Colorado Discharge Permit System (CDPS) | Open Energy  

Open Energy Info (EERE)

CO-b - Colorado Discharge Permit System (CDPS) CO-b - Colorado Discharge Permit System (CDPS) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CO-b - Colorado Discharge Permit System (CDPS) 14COBColoradoDischargePermitSystemCDPS.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Water Quality Control Act 5 CCR 1002-61 5 CCR 1002-62 Triggers None specified Click "Edit With Form" above to add content 14COBColoradoDischargePermitSystemCDPS.pdf 14COBColoradoDischargePermitSystemCDPS.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Colorado Department of Public Health and Environment (CDPHE) Water

83

GRR/Section 4-AK-b - Geophysical Exploration Permit | Open Energy  

Open Energy Info (EERE)

4-AK-b - Geophysical Exploration Permit 4-AK-b - Geophysical Exploration Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-AK-b - Geophysical Exploration Permit 04AKBGeophysicalExplorationPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Oil and Gas Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 04AKBGeophysicalExplorationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A Geophysical Exploration Permit is necessary for conducting seismic

84

GRR/Section 6-HI-b - Hawaii Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

b - Hawaii Construction Storm Water Permit b - Hawaii Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-HI-b - Hawaii Construction Storm Water Permit 06HIBHawaiiConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Clean Water Branch Regulations & Policies Section 402 of the Clean Water Act (33 U.S.C. 1251 et seq.) Hawaii Administrative Rules 11-55 Triggers None specified Click "Edit With Form" above to add content 06HIBHawaiiConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer must prepare and submit a Notice of Intent and associated

85

GRR/Section 14-OR-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-OR-b - NPDES Permitting Process GRR/Section 14-OR-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-OR-b - NPDES Permitting Process 14ORBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Regulations & Policies OAR Division 45 Regulations Pertaining to NPDES and WPCF Permits Triggers None specified Click "Edit With Form" above to add content 14ORBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative As part of its efforts to protect and improve Oregon's water quality, DEQ

86

GRR/Section 14-AK-c - Alaska UIC Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-AK-c - Alaska UIC Permit GRR/Section 14-AK-c - Alaska UIC Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-AK-c - Alaska UIC Permit 14AKCAlaskaUICPermit.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 14AKCAlaskaUICPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Underground Injection Control Permit is regulated by the Environmental Protection Agency. The EPA regulates Class V injection wells on Federal lands, many tribal lands, and in some states like Alaska. Injection wells are overseen by either a state or Tribal Agency or one of

87

GRR/Section 3-AK-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-AK-c - Encroachment Permit GRR/Section 3-AK-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-c - Encroachment Permit 03AKCEncroachmentOverview.pdf Click to View Fullscreen Contact Agencies Alaska Department of Transportation and Public Facilities Regulations & Policies 17 AAC 10.011: Encroachments Authorized 17 AAC 10.012: Approval Requirements 17 AAC 15.011: Utility Permits Triggers None specified Click "Edit With Form" above to add content 03AKCEncroachmentOverview.pdf 03AKCEncroachmentOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 3-AK-c.1 - Will the Developer Construct a Utility Within ADOT ROW or

88

GRR/Section 3-NV-c - Encroachment Permit for NDOT ROW | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-NV-c - Encroachment Permit for NDOT ROW GRR/Section 3-NV-c - Encroachment Permit for NDOT ROW < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-NV-c - Encroachment Permit for NDOT ROW 03NVCEncroachment (1).pdf Click to View Fullscreen Contact Agencies Nevada Department of Transportation Regulations & Policies NRS Chapter 405 Control and Preservation of Public Highways Triggers None specified Click "Edit With Form" above to add content 03NVCEncroachment (1).pdf 03NVCEncroachment (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Department of Transportation (NDOT) grants permits for permanent installations within State rights-of-way and in areas maintained by the

89

GRR/Section 19-WA-b - New Water Right Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-WA-b - New Water Right Permit Process GRR/Section 19-WA-b - New Water Right Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-b - New Water Right Permit Process 19-WA-b - New Water Right Permit Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 Triggers None specified Washington uses a prior appropriation system for the distribution of both surface water and ground water rights in which water users receive the right to use water on a "first in time, first in right" basis. Under Washington law, the waters of Washington belong collectively to the public

90

GRR/Section 14-ID-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-b - NPDES Permitting Process GRR/Section 14-ID-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-b - NPDES Permitting Process 14IDBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 14IDBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 'National Pollutant Discharge Elimination System Permits' The NPDES program requires facilities discharging from a point source into

91

GRR/Section 18-UT-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

UT-b - Hazardous Waste Permit Process UT-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-UT-b - Hazardous Waste Permit Process 18UTBHazardousWastePermitProcess (1).pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies Hazardous Waste Rules R315-1 et seq Triggers None specified Click "Edit With Form" above to add content 18UTBHazardousWastePermitProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A hazardous waste is specifically listed by the Utah Solid and Hazardous Waste Rules or exhibits a characteristic such as ignitability, corrosivity,

92

GRR/Section 4-AK-c - Geothermal Exploration Permit | Open Energy  

Open Energy Info (EERE)

4-AK-c - Geothermal Exploration Permit 4-AK-c - Geothermal Exploration Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-AK-c - Geothermal Exploration Permit 04AKCGeothermalExplorationPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Oil and Gas Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 04AKCGeothermalExplorationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Department of Natural Resources requires filing an application

93

GRR/Section 6-UT-c - Drinking Water Permit | Open Energy Information  

Open Energy Info (EERE)

6-UT-c - Drinking Water Permit 6-UT-c - Drinking Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-UT-c - Drinking Water Permit 06UTCDrinkingWaterPermit.pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies R309-100 Administration: Drinking Water Program Utah Water Well Rules R655-4 Safe Drinking Water Act Triggers None specified Click "Edit With Form" above to add content 06UTCDrinkingWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Public water systems are responsible for drinking water infastructure,

94

GRR/Section 19-TX-e - Temporary Surface Water Permit | Open Energy  

Open Energy Info (EERE)

-TX-e - Temporary Surface Water Permit -TX-e - Temporary Surface Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-TX-e - Temporary Surface Water Permit 19-TX-e Temporary Surface Water Permit.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Regulations & Policies Tex. Water Code § 11.138 Triggers None specified Click "Edit With Form" above to add content 19-TX-e Temporary Surface Water Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Texas, the Texas Commission on Environmental Quality (TCEQ), or in certain instances regional TCEQ offices or local Watermasters, issue

95

GRR/Section 6-MT-e - Floodplain Development Permit | Open Energy  

Open Energy Info (EERE)

6-MT-e - Floodplain Development Permit 6-MT-e - Floodplain Development Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-MT-e - Floodplain Development Permit 06MTEFloodplainDevelopmentPermit (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Federal Emergency Management Agency Triggers None specified Click "Edit With Form" above to add content 06MTEFloodplainDevelopmentPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Anyone planning new development within a designated Special Flood Hazard Areas (SFHA). Check with local floodplain [www.mtfloodplain.mt.gov

96

GRR/Section 14-NV-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

4-NV-c - Underground Injection Control Permit 4-NV-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-c - Underground Injection Control Permit 14NVCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Nevada Division of Minerals Nevada Division of Water Resources Bureau of Land Management Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 14NVCUndergroundInjectionControlPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

97

GRR/Section 6-TX-a - Extra-Legal Vehicle Permitting Process | Open Energy  

Open Energy Info (EERE)

6-TX-a - Extra-Legal Vehicle Permitting Process 6-TX-a - Extra-Legal Vehicle Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-TX-a - Extra-Legal Vehicle Permitting Process 06TXAExtraLegalVehiclePermittingProcess.pdf Click to View Fullscreen Contact Agencies Texas Department of Motor Vehicles Texas Department of Transportation Regulations & Policies Tex. Transportation Code § 621 Tex. Transportation Code § 622 Tex. Transportation Code § 623 43 TAC 219 Triggers None specified Click "Edit With Form" above to add content 06TXAExtraLegalVehiclePermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

98

GRR/Section 6-MT-b - Construction Storm Water Permit | Open Energy  

Open Energy Info (EERE)

MT-b - Construction Storm Water Permit MT-b - Construction Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-MT-b - Construction Storm Water Permit 06MTBConstructionStormWaterPermit (7).pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Code Annotated 75-5 [ARM 17.30.1101] Triggers None specified Click "Edit With Form" above to add content 06MTBConstructionStormWaterPermit (7).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Montana regulates water quality under Montana Code Annotated 75-5. The

99

GRR/Section 6-NV-b - Construction Stormwater Permit | Open Energy  

Open Energy Info (EERE)

NV-b - Construction Stormwater Permit NV-b - Construction Stormwater Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-b - Construction Stormwater Permit 06NVBConstructionStormWaterPermit (1).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statue 445A Nevada Administrative Code 445A.228 to 445A.272 Triggers None specified Click "Edit With Form" above to add content 06NVBConstructionStormWaterPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer who disturbs more than one acre and less than five acres must

100

GRR/Section 6-HI-a - Oversize and Overweight Vehicles and Loads Permit |  

Open Energy Info (EERE)

a - Oversize and Overweight Vehicles and Loads Permit a - Oversize and Overweight Vehicles and Loads Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-HI-a - Oversize and Overweight Vehicles and Loads Permit 06HIAOversizeAndOrOverweightVehiclesAndLoadsPermit (1).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Highways Division Regulations & Policies Hawaii Administrative Rules Title 19, Chapter 104 Triggers None specified Click "Edit With Form" above to add content 06HIAOversizeAndOrOverweightVehiclesAndLoadsPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

GRR/Section 14-CA-b - NPDES Permit | Open Energy Information  

Open Energy Info (EERE)

4-CA-b - NPDES Permit 4-CA-b - NPDES Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CA-b - NPDES Permit 14CABNPDESPERMIT.pdf Click to View Fullscreen Contact Agencies California State Water Resources Control Board Environmental Protection Agency Regulations & Policies Clean Water Act Porter-Cologne Water Quality Control Act Triggers None specified Click "Edit With Form" above to add content 14CABNPDESPERMIT.pdf 14CABNPDESPERMIT.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A National Pollutant Discharge Elimination System (NPDES) permit is required for point source discharges to surface water. The permits are

102

GRR/Section 15-OR-a - Air Contaminant Discharge Permit | Open Energy  

Open Energy Info (EERE)

5-OR-a - Air Contaminant Discharge Permit 5-OR-a - Air Contaminant Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-OR-a - Air Contaminant Discharge Permit 15ORAAirContaminantDischargePermit (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Regulations & Policies ORS Chapter 468a OAR 340-209 OAR 340-216 340-216-0020 (Table 1) Triggers None specified Click "Edit With Form" above to add content 15ORAAirContaminantDischargePermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Oregon Department of Environmental Quality (DEQ) regulates air

103

GRR/Section 18-AK-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

8-AK-b - Hazardous Waste Permit Process 8-AK-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-AK-b - Hazardous Waste Permit Process 18AKB - HazardousWastePermitProcess (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation United States Environmental Protection Agency Regulations & Policies AS 46.03.302 18 AAC 60.020 Triggers None specified Click "Edit With Form" above to add content 18AKB - HazardousWastePermitProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Department of Environmental Conservation defers to the federal

104

GRR/Section 4-OR-d - Exploration Injection Permit | Open Energy Information  

Open Energy Info (EERE)

4-OR-d - Exploration Injection Permit 4-OR-d - Exploration Injection Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-OR-d - Exploration Injection Permit 04ORDExplorationInjectionPermit (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Regulations & Policies OAR 340-044-0012: Authorization of Underground Injection Triggers None specified Click "Edit With Form" above to add content 04ORDExplorationInjectionPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 4-OR-d.1 - Is this New Injection Activity or a Renewal? The developer must follow one of two different procedures if the developer

105

GRR/Section 19-AK-b - Temporary Use of Water Permit | Open Energy  

Open Energy Info (EERE)

9-AK-b - Temporary Use of Water Permit 9-AK-b - Temporary Use of Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-AK-b - Temporary Use of Water Permit 19AKBTemporaryUseOfWaterPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Water Use Act Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 19AKBTemporaryUseOfWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Alaska, water is declared a public resource belonging to the people of

106

GRR/Section 6-HI-d - Oversize and/or Overweight Vehicles and Loads Permit |  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 6-HI-d - Oversize and/or Overweight Vehicles and Loads Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections or Overweight Vehicles and Loads Permit Flowchart Narrative Content Here Print PDF Retrieved from "http://en.openei.org/w/index.php?title=GRR/Section_6-HI-d_-_Oversize_and/or_Overweight_Vehicles_and_Loads_Permit&oldid=685849" Categories: Regulatory Roadmap Overview Sections Geothermal Regulatory Roadmap Sections What links here Related changes Special pages

107

GRR/Section 14-MT-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 14-MT-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-MT-c - Underground Injection Control Permit 14MTCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 14MTCUndergroundInjectionControlPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

108

GRR/Section 3-UT-f - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 3-UT-f - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-UT-f - Encroachment Permit 03UTFEncroachmentPermit.pdf Click to View Fullscreen Contact Agencies Utah Department of Transportation Triggers None specified Click "Edit With Form" above to add content 03UTFEncroachmentPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

109

GRR/Section 14-CO-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 14-CO-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CO-c - Underground Injection Control Permit 14COCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Colorado Division of Water Resources Triggers None specified Click "Edit With Form" above to add content 14COCUndergroundInjectionControlPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The United States Environmental Protection Agency (EPA) has not delegated

110

GRR/Section 14-MT-b - MPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-MT-b - MPDES Permitting Process GRR/Section 14-MT-b - MPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-MT-b - MPDES Permitting Process 14MTBMPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality United States Environmental Protection Agency Regulations & Policies MCA 75-5-402: Duties of MDEQ MCA 75-5-403: Denial, Modification, Review 75-5-611: Violation, Hearing Triggers None specified Click "Edit With Form" above to add content 14MTBMPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

111

GRR/Section 14-HI-b - NPDES Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-HI-b - NPDES Permit GRR/Section 14-HI-b - NPDES Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-HI-b - NPDES Permit 14HIBStateCleanWaterActProcess.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Clean Water Branch Regulations & Policies Hawaii Administrative Rules Chapter 11-55 Triggers None specified Click "Edit With Form" above to add content 14HIBStateCleanWaterActProcess.pdf 14HIBStateCleanWaterActProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative State Clean Water Act Process Clean water act approval is needed to engage in any activity that might materially alter the surrounding water supply, or to operate a facility

112

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor |  

Open Energy Info (EERE)

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Harbors Divsion Regulations & Policies Hawaii Revised Statutes Chapter 277 Triggers None specified Click "Edit With Form" above to add content 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

113

GRR/Section 3-HI-e - Permit to Construct Upon a State Highway ROW | Open  

Open Energy Info (EERE)

GRR/Section 3-HI-e - Permit to Construct Upon a State Highway ROW GRR/Section 3-HI-e - Permit to Construct Upon a State Highway ROW < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-e - Permit to Construct Upon a State Highway ROW 03HIEConstructionUponAStateHighwayROW.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Highways Division Regulations & Policies Hawaii Revised Statute Chapter 264 Hawaii Administrative Rules Title 19, Chapter 102 Hawaii Administrative Rules Title 19, Chapter 105 Triggers None specified Click "Edit With Form" above to add content 03HIEConstructionUponAStateHighwayROW.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

114

GRR/Section 18-WA-b - Dangerous Waste Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 18-WA-b - Dangerous Waste Permit GRR/Section 18-WA-b - Dangerous Waste Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-b - Dangerous Waste Permit 18-WA-b - Dangerous Waste Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-303-020 WAC 173-303-060 WAC 173-303-070 WAC 173-303-071 WAC 173-303-072 WAC 173-303-081 WAC 173-303-082 WAC 173-303-090 WAC 173-303-100 WAC 173-303-110 WAC 173-303-140 WAC 173-303-220 WAC 173-303-281 WAC 173-303-282 WAC 173-303-803 WAC 173-303-845 Triggers None specified The Washington State Department of Ecology (WSDE) oversees the permitting process for dangerous and solid waste. In Washington, a developer must obtain a permit if they handle dangerous waste and solid waste and are

115

GRR/Section 8-CA-c - Permit to Construct | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 8-CA-c - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-CA-c - Permit to Construct 08CACPermitToConstruct.pdf Click to View Fullscreen Contact Agencies California Public Utilities Commission Regulations & Policies California Environmental Quality Act General Order 131-D Triggers None specified Click "Edit With Form" above to add content 08CACPermitToConstruct.pdf 08CACPermitToConstruct.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Public utilities must receive a Permit to Construct from the California

116

GRR/Section 14-FD-b - EPA NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

FD-b - EPA NPDES Permitting Process FD-b - EPA NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-FD-b - EPA NPDES Permitting Process 14FDBEPANPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Regulations & Policies Clean Water Act 40 CFR 122 EPA Administered NPDES 40 CFR 124 EPA Decisionmaking Procedures Triggers None specified Click "Edit With Form" above to add content 14FDBEPANPDESPermittingProcess.pdf 14FDBEPANPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The National Pollutant Discharge Elimination System (NPDES) regulations at

117

GRR/Section 14-CA-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

14-CA-c - Underground Injection Control Permit 14-CA-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-CA-c - Underground Injection Control Permit 14CACUndergroundInjectionControl.pdf Click to View Fullscreen Contact Agencies California Department of Conservation, Division of Oil, Gas, and Geothermal Resources Regulations & Policies Division 3, Chapter 4 of the California Public Resources Code Title 14, Division 2, Chapter 4 of the California Code of Regulations Title 40, Code of Federal Regulations, Part 144 Title 40, Code of Federal Regulations, Part 146 Triggers None specified Click "Edit With Form" above to add content 14CACUndergroundInjectionControl.pdf Error creating thumbnail: Page number not in range.

118

GRR/Section 14-NV-b - NPDES Permit Program | Open Energy Information  

Open Energy Info (EERE)

4-NV-b - NPDES Permit Program 4-NV-b - NPDES Permit Program < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-b - NPDES Permit Program 14NVBNPDESPermitProgram.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Nevada Division of Water Resources nevada Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Nevada Water Pollution Control Law: NRS 445A.300-445A.730 Triggers None specified Click "Edit With Form" above to add content 14NVBNPDESPermitProgram.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

119

GRR/Section 14-TX-b - Texas NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

14-TX-b - Texas NPDES Permitting Process 14-TX-b - Texas NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-TX-b - Texas NPDES Permitting Process 14TXBTexasNPDESPermittingProcess (4).pdf Click to View Fullscreen Contact Agencies Railroad Commission of Texas United States Environmental Protection Agency Regulations & Policies Tex. Water Code § 26.131(b) 16 TAC 3.8 Memorandum of Understanding between the RRC and the TCEQ 16 TAC 3.30 Triggers None specified Click "Edit With Form" above to add content 14TXBTexasNPDESPermittingProcess (4).pdf 14TXBTexasNPDESPermittingProcess (4).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

120

GRR/Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) | Open  

Open Energy Info (EERE)

18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18CABRCRAProcess (2).pdf Click to View Fullscreen Contact Agencies California Environmental Protection Agency Department of Toxic Substances Control Regulations & Policies Resource Conservation and Recovery Act 40 CRF 261 Title 22, California Code of Regulations, Division 4.5 Triggers None specified Click "Edit With Form" above to add content 18CABRCRAProcess (2).pdf 18CABRCRAProcess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

GRR/Section 19-AK-c - Permit to Appropriate | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 19-AK-c - Permit to Appropriate < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-AK-c - Permit to Appropriate 19AKCPermitToAppropriate.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Water Use Act Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 19AKCPermitToAppropriate.pdf 19AKCPermitToAppropriate.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Alaska, water is declared a public resource belonging to the people of

122

PERMIT ATTACHMENT DD Contingency Plan Section 10 of the Permit Application; and Hanford Test and Demonstration Facility Contingency Plan Appendix C of the Permit Application  

E-Print Network (OSTI)

The following listed documents are hereby incorporated, in their entirety, by reference into this Permit. Some of the documents are excerpts from the Permittees DBVS Facility Research, Development, and Demonstration Dangerous Waste Permit Application dated May 10, 2004 (document #04-TED-036); hereafter called the Permit Application. Ecology has, as deemed necessary, modified specific language in the attachments. These modifications are described in the permit conditions (Parts I through V), and thereby supersede the language of the attachment. These incorporated attachments are enforceable conditions of this Permit, as modified by the

unknown authors

2004-01-01T23:59:59.000Z

123

GRR/Section 3-AK-g - Utility Permit to Construct on ADOT&PF ROW | Open  

Open Energy Info (EERE)

GRR/Section 3-AK-g - Utility Permit to Construct on ADOT&PF ROW GRR/Section 3-AK-g - Utility Permit to Construct on ADOT&PF ROW < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-g - Utility Permit to Construct on ADOT&PF ROW 03AKGUtilityPermitToConstructOnADOTROW (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Transportation and Public Facilities U S Army Corps of Engineers United States Coast Guard Bureau of Indian Affairs Bureau of Land Management Federal Aviation Administration Alaska Department of Natural Resources Regulations & Policies 11 AAC 195.010: Anadromous Fish 17 AAC 15.021: Application for Utility Permit Triggers None specified Click "Edit With Form" above to add content 03AKGUtilityPermitToConstructOnADOTROW (1).pdf

124

GRR/Section 4-FD-a - Exploration Permit BLM | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » GRR/Section 4-FD-a - Exploration Permit BLM < GRR Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Resource Area: Details Technical Info Geology Power Plants (70 Projects (56 Activities (1574 Geothermal Area Profile Location Exploration Region GEA Development Phase 2008 USGS Resource Estimate Mean Reservoir Temp Estimated Reservoir Volume Mean Capacity Power Production Profile Gross Production Capacity 300.7 MW300,700 kW 300,700,000 W 300,700,000,000 mW 0.301 GW 3.007e-4 TW Net Production Capacity 206,358 MW206,358,000 kW 206,358,000,000 W 206,358,000,000,000 mW 206.358 GW

125

GRR/Section 14-CA-e - Waste Discharge Permit | Open Energy Information  

Open Energy Info (EERE)

| Sign Up Search Page Edit History Facebook icon Twitter icon GRRSection 14-CA-e - Waste Discharge Permit < GRR Jump to: navigation, search Retrieved from "http:...

126

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting...  

Open Energy Info (EERE)

GRRSection 19-CO-c - Designated Ground Water Basin Well Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help...

127

GRR/Section 3-CO-f - Utility or Special Use Permit | Open Energy...  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon GRRSection 3-CO-f - Utility or Special Use Permit < GRR Jump to: navigation, search Retrieved from "http:en.openei.orgw...

128

Migratory Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

Migratory Birds Migratory Birds Migratory Birds By avoiding or minimizing the impact of Laboratory activities on migratory bird populations, LANL can reduce or eliminate the biological significance of any potential violation of the Migratory Bird Treaty Act. April 12, 2012 A bird of the Pacific Northwest, the Townsend's Warbler nests in coniferous forests from Alaska to Oregon. It winters in two distinct areas: in a narrow strip along the Pacific Coast, and in Mexico and Central America. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Best management practices provide mitigation measures for projects to reduce risks to migratory birds. Protecting migratory birds In the biological sense, a migratory bird is a bird that has a seasonal and

129

Bird Habitats  

NLE Websites -- All DOE Office Websites (Extended Search)

Bird Habitats Bird Habitats Bird Habitats The avian nest box monitoring network is located in northern New Mexico to investigate the health and condition of bird populations that nest in bird houses on the Pajarito plateau. April 12, 2012 Avian nest box on LANL land Boxes are placed in the open ponderosa pine forest of the canyons and piñon-juniper woodland on the Pajarito plateau mesas. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The monitoring data are used in a population viability analysis that can determine the status of the population and potential impacts of contaminants. Who nests in our network? More than two dozen North American bird species prefer to nest in bird houses. At LANL, we provide nestboxes for the following native bird

130

Bird guard  

DOE Patents (OSTI)

The bird guard provides a device to protect electrical insulators comprising a central shaft; a clamp attached to an end of the shaft to secure the device to a transmission tower; a top and bottom cover to shield transmission tower insulators; and bearings to allow the guard to rotate in order to frighten birds away from the insulators.

Fairchild, Dana M. (Armour, SD)

2010-03-02T23:59:59.000Z

131

Birds' Nests  

NLE Websites -- All DOE Office Websites (Extended Search)

are pressed into place and reinforced with blades of dead grass. With the exception of eagles and certain hawks it is one of the few birds that uses the same nest more than one...

132

Talking Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

more words and sing songs or utter several sentences. Birds have varying degrees of intelligence and some, like the crow, are very intelligent but they do not think as we do and...

133

Sleeping Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

Sleeping Birds Sleeping Birds Nature Bulletin No. 445-A February 19, 1972 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation SLEEPING BIRDS Each winter, a few years ago, several thousand crows, roosted in the big woods near our house. In daytime they spread out over the countryside to find food but each evening, about sundown, they came streaming back in a continuous parade that took almost an hour to pass. In flocks of dozens or hundreds with scattered birds between, they flew the same route every day. In downstate Illinois, similar flocks roost in overgrown hedgerows of osage orange, isolated groves of timber, or on willow grown islands in large rivers. A much smaller flock still roosts the year-round in our woods. Ordinarily they slip in a little before dusk and settle down quietly but occasionally there is a hullabaloo as if they were squabbling over a favorite perch occupied by some newcomers. Just before dawn, one old bird we call "the bugler" caws three times. A minute or two later he repeats it. Then, one by one, drowsy voices of other crows are heard -- much like human sleepyheads in the morning. Sometimes an alarm call is heard during the night followed by a general clamor as if the flock had been disturbed by a marauding owl, weasel or raccoon. Crows are very wary and, like most birds, light sleepers.

134

Bird Banding  

NLE Websites -- All DOE Office Websites (Extended Search)

Bird Banding Bird Banding Name: Matthew Location: N/A Country: N/A Date: N/A Question: I am researching why the US fish and wildlife agency bands ducks and what information is used to set hunting daily and possession limits. Replies: Matt, The USFW service has been doing this for decades to have statistical data on the population fluctuations of all birds. This information serves to warn when over hunting has taken a toll on a species or if a species is declining due to habitat loss or whatever. This information also indicates need for increased habitat areas as well as possible hunting restrictions. This organization has a formula for setting hunting limits based upon the data received from banding. It is important that all hunters return these bands for they are the ones who will suffer if the information is not there. Females of any species are the most important for reproduction and often they are protected over the males. This should explain the differences in what can be bagged.

135

Wetland Mitigation Banks and the No-Net-Loss Requirement: An Evaluation of the Section 404 Permit Program in Southeast Louisiana.  

E-Print Network (OSTI)

??Section 404 of the Clean Water Act provides regulatory oversight for wetland conservation. One goal of the Section 404 program is to achieve a no-net-loss (more)

Tyrna, Abbey Anne

2008-01-01T23:59:59.000Z

136

Bird Feet Biology  

NLE Websites -- All DOE Office Websites (Extended Search)

Bird Feet Biology Name: Jeanne Location: NA Country: NA Date: NA Question: Why don't birds feet freeze during the cold winter months? Replies: I'm not sure about all birds, but...

137

Water Permits (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Water Permits Division authorizes permits administered under the Water Quality Regulations. Louisiana's Water Quality Regulations require permits for the discharge of pollutants from any point...

138

Bird Beaks and Feet  

NLE Websites -- All DOE Office Websites (Extended Search)

a bird gives a good clue to its feeding habits. Carnivorous birds like hawks, owls and eagles have strong hooked beaks for tearing flesh. Herons, egrets and kingfishers, with their...

139

Migratory Birds Update  

NLE Websites -- All DOE Office Websites (Extended Search)

Migratory Birds Update Jane Powers Office of Environmental Policy and Assistance, HS-22 SAN Call July 19, 2012 Migratory Bird MOU * Final draft was distributed to U.S. Fish and...

140

Migratory Birds Update  

NLE Websites -- All DOE Office Websites (Extended Search)

Migratory Birds Update Jane Powers Office of Environmental Policy and Assistance, HS-22 SAN Call October 18, 2012 Migratory Bird MOU * Draft distributed to U.S. Fish and Wildlife...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Bird Protection in Illinois  

NLE Websites -- All DOE Office Websites (Extended Search)

Protection in Illinois Protection in Illinois Nature Bulletin No. 550-A January 18, 1975 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation BIRD PROTECTION IN ILLINOIS Very few people are indifferent about birds. Almost every bird is the feathered friend of somebody or some organization ready to do battle in its behalf. At present, in Illinois, songbirds and most other wild birds, together with their nests and eggs, are completely protected by law at all times. A few kinds, called game birds, may be shot by hunters -- pheasants and quail, also migratory ducks, geese, coots, jacksnipes, woodcocks, and doves. Such hunting must be done with shotguns in certain places in certain open seasons with many other detailed restrictions. Now, even crow hunters are licensed. The only unprotected birds are those three immigrants or exotics: the English sparrow, the European starling and the "domestic " pigeon. These, too, have their friends .

142

Incubation of Birds' Eggs  

NLE Websites -- All DOE Office Websites (Extended Search)

Incubation of Birds' Eggs Nature Bulletin No. 456-A May 6, 1972 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation...

143

Pantex Migratory Bird Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Migratory Bird Program James D. Ray Wildlife Biologist Babcock & Wilcox Technical Services Pantex, LLC What is Pantex? U.S. Department of EnergyNational Nuclear...

144

Fish-Eating Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

Fish-Eating Birds Nature Bulletin No. 307-A May 18, 1968 Forest Preserve District of Cook County Richard B. Ogilvie, President Roland F. Eisenbeis, Supt. of Conservation...

145

Migration of Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

Birds Birds Nature Bulletin No. 146 March 13, 1948 Forest Preserve District of Cook County William N, Erickson, President Roberts Mann, Supt. of Conservation MIGRATION OF BIRDS High in the sky, wild geese are honking as they return to their nesting ground in the far north. Presently, our summer songbirds will appear and the ponds and marshes be repopulated by ducks and shore birds. Some birds, like the juncos and tree sparrows, resident here all winter, will leave for Canada or our northern states, in May, great flocks of warblers will arrive, tarry briefly, and pass on, not to be seen again until they migrate southward in autumn. The spectacular annual journeys of many kinds of birds, and their homing "instincts", have been a source of wonder since ancient times. In recent years, large-scale marking with small aluminum identification bands upon their legs, has yielded much information about birds their migration routes, speed of travel, summer and winter homes, length of life and life histories.

146

permitting | OpenEI Community  

Open Energy Info (EERE)

permitting permitting Home Alevine's picture Submitted by Alevine(5) Member 29 July, 2013 - 14:46 Texas Legal Review BHFS flora and fauna leasing Legal review permitting roadmap Texas The NREL roadmap team recently met with our legal team Brownstein Hyatt Farber and Schreck (www.bhfs.com) for a review of the Texas portion of the Geothermal Regulatory Roadmap (GRR). BHFS provided excellent suggestions to the Section 3 flowcharts for geothermal leases on Texas state lands. The Texas portion of the GRR now encompasses a flowchart for Texas state land leasing on Permanent School Fund Lands, Texas Parks and Wildlife Department Lands, Land Trade Lands, and Relinquishment Act Lands. Additionally, BHFS provided many other helpful tips for clarifying other issue Kyoung's picture Submitted by Kyoung(155)

147

Uncommon Large Aquatic Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

swans, largest of the swimming birds, are known to breed in Yellowstone Park, in the Red Rock Lakes Refuge in Montana, and along the Snake River in Idaho. A few hundred more...

148

Crested Flycatcher Bird House  

NLE Websites -- All DOE Office Websites (Extended Search)

Crested Flycatcher Bird House Name: kristin Location: NA Country: NA Date: NA Question: What would be the best wood to use to build a house for a crested flycatcher? And what...

149

Wild Birds in Captivity  

NLE Websites -- All DOE Office Websites (Extended Search)

Wild Birds in Captivity Name: Suzanne Location: NA Country: NA Date: NA Question: Our cat has found a young cedar waxwing - which he left unharmed - on our lawn. We have taken...

150

Coalfleet IGCC Permits Database  

Science Conference Proceedings (OSTI)

The CoalFleet IGCC Permits Database presents comprehensive information on permitting requirements and permit conditions for Integrated Gasification Combined Cycle (IGCC) power plants in an online database format. This Technical Update is a compilation of the Database contents as of April 1, 2009.

2009-05-01T23:59:59.000Z

151

Migratory Bird Treaty Act | Open Energy Information  

Open Energy Info (EERE)

Migratory Bird Treaty Act Migratory Bird Treaty Act Jump to: navigation, search Statute Name Migratory Bird Treaty Act Year 1918 Url [[File:|160px|link=http://law2.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+6189+0++%28%29%20%20AND%20%28%2816%29%20ADJ%20USC%29%3ACITE%20AND%20%28USC%20w%2F10%20%28703%29%29%3ACITE%20%20%20%20%20%20%20%20%20]] Description References FWS Overview[1] The original 1918 statute implemented the 1916 Convention between the U.S. and Great Britain (for Canada) for the protection of migratory birds. Later amendments implemented treaties between the U.S. and Mexico, the U.S. and Japan, and the U.S. and the Soviet Union (now Russia). Specific provisions in the statute include: Establishment of a Federal prohibition, unless permitted by regulations, to

152

Alternative Fuels Data Center: Biofuels Construction and Permitting  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Construction Biofuels Construction and Permitting Assistance to someone by E-mail Share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Facebook Tweet about Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Twitter Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Google Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Delicious Rank Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Digg Find More places to share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

153

Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Hydrogen Fueling Hydrogen Fueling Infrastructure Permitting and Safety to someone by E-mail Share Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Facebook Tweet about Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Twitter Bookmark Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Google Bookmark Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Delicious Rank Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Digg Find More places to share Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on AddThis.com... More in this section... Federal State Advanced Search

154

The Fermilab Bird List  

NLE Websites -- All DOE Office Websites (Extended Search)

The Fermilab Bird List The Fermilab Bird List Data compilation by Peter Kasper. See the following link information concerning the Current Status of Access to Fermilab The following pages contain lists, of nearly all the bird species recorded within the Fermilab site boundaries. The names and ordering follow that of the American Ornithologists Union's check-list of North American birds. The lists also indicate at what time of year each species was found. To do this we have divided each year into 48 quarter-months and split the entire survey into five year periods. The first period started in 1987. A symbol is entered into the table for each record, indicating in which survey periods the record occurred. A legend describing these symbols is included with each page. Each list entry also contains a link to some text describing the bird's status on the site. Some exotic species have been excluded from the main list since they are extremely unlikely to have occurred naturally.

155

Improving Performance of Federal Permitting and Review of Infrastructu...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

156

NSLS Committees | Work Planning/Permit Review Committee  

NLE Websites -- All DOE Office Websites (Extended Search)

require enhanced work planning. Committees review and approve submitted work permits. NSLS reports to Operations Section Head, Emil Zitvogel. NSLS-II reports to ESH Manager,...

157

Presidential Permits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assurance Cybersecurity Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits -...

158

Stormwater Permits (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

Stormwater permits are required for the construction of a new generation facility, the reconstruction or expansion of a facility, the operation of a generation facility which discharges stormwater...

159

Bird orientation: compensation for wind  

E-Print Network (OSTI)

Bird orientation: compensation for wind drift in migrating raptors is age dependent Kasper Thorup1 14.04.03 Despite the potentially strong effect of wind on bird orientation, our understanding of how wind drift affects migrating birds is still very limited. Using data from satellite-based radio

Thorup, Kasper

160

Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compressed Natural Gas Compressed Natural Gas (CNG) Permit to someone by E-mail Share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Facebook Tweet about Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Twitter Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Google Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Delicious Rank Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Digg Find More places to share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Compressed Natural Gas (CNG) Permit Anyone dispensing CNG for use in vehicles must obtain a permit from the

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compressed Natural Gas Compressed Natural Gas (CNG) Dealer Permit to someone by E-mail Share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Facebook Tweet about Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Twitter Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Google Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Delicious Rank Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Digg Find More places to share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Compressed Natural Gas (CNG) Dealer Permit

162

Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fueling Station Air Fueling Station Air Quality Permit Exemption to someone by E-mail Share Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Facebook Tweet about Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Twitter Bookmark Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Google Bookmark Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Delicious Rank Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Digg Find More places to share Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fueling Station Air Quality Permit Exemption

163

EO 13186: Responsibilities of Federal Agencies To Protect Migratory Birds  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

853 853 Federal Register Vol. 66, No. 11 Wednesday, January 17, 2001 Title 3- The President Executive Order 13186 of January 10, 2001 Responsibilities of Federal Agencies To Protect Migratory Birds By the authority vested in me as President by the Constitution and the laws of the United States of America, and in furtherance of the purposes of the migratory bird conventions, the Migratory Bird Treaty Act (16 U.S.C. 703-711), the Bald and Golden Eagle Protection Acts (16 U.S.C. 668-668d), the Fish and Wildlife Coordination Act (16 U.S.C. 661-666c), the Endangered Species Act of 1973 (16 U.S.C. 1531-1544), the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4347), and other pertinent statutes, it is hereby ordered as follows: Section 1. Policy. Migratory birds are of great ecological and economic

164

NREL: Energy Analysis - Lori Bird  

NLE Websites -- All DOE Office Websites (Extended Search)

E-mail: lori.bird@nrel.gov Areas of expertise Market analysis Policy analysis Primary research interests Renewable energy and carbon markets Renewable energy policy...

165

Prairie Birds of the Cornbelt  

NLE Websites -- All DOE Office Websites (Extended Search)

Prairie Birds of the Cornbelt Prairie Birds of the Cornbelt Nature Bulletin No. 305 May 5, 1984 Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation PRAIRIE BIRDS OF THE CORNBELT The Ideal way to get acquainted with the birds of the open fields and prairies is to take a team of horses and raise a crop of corn. Birds are not afraid of horses and a farmer or his boy can watch them, close up, day after day. Unlike tractors, horses guide themselves most of the time and the driver has plenty of chances to look and listen -- especially while plowing. The small animal life uncovered by a freshly turned furrow offers a free lunch for birds. Several sorts of typical ground-nesting birds are loined by blackbirds, cowbirds, robins, and even the wary crows, from nearby hedgerows, farmsteads and woodlands to form a flying, running, hopping parade behind the plow. They and the prairie birds rush to grab earthworms. cutworms, white grubs, beetles and ants.

166

Bird Nest Predation  

NLE Websites -- All DOE Office Websites (Extended Search)

Bird Nest Predation Bird Nest Predation Name: Susan Location: N/A Country: N/A Date: N/A Question: On the 18th of April, a pair of Northern Cardinals selected a nest site near the top of a dense, 8 foot holly tree, a foundation planting that obscures about 1/4 of our open front porch. They located the nest under the overhang of the roof, facing our front door. By the 21st, a clutch of three eggs had been laid and Mrs. C began to sit on the nest. We succeeded at keeping a low profile, despite the near proximity to our main entrance. She was relaxed and seemingly unworried by our quiet comings and goings. Yesterday morning, all was well, but sometime around midday, after almost a week of incubation, all three eggs and, it appears, Mrs. C, vanished without a trace! There is no obvious disturbance or damage to the nest or the immediate area. The interior of the nest is pristine ~ no feathers, eggshell bits, membrane material. Cats are rarely a problem. In addition to the typical Blue Jays and Crows, we have a lot of squirrels, raccoons, opossums, skunks and even a pair of red-tail hawks on our wooded acre and the surrounds. Due to, I believe, some nearby housing construction, I have observed a opossum during the day several times this past week and have noticed a new arrival, a woodchuck. With temperatures in the 50's, I think it is too chilly for snakes to be active. What would be your best guess as to what happened? Any chance the pair will return to the same nest and try again?

167

Transmission/Permitting Atlas/State Data | Open Energy Information  

Open Energy Info (EERE)

Transmission/Permitting Atlas/State Data Transmission/Permitting Atlas/State Data < Transmission‎ | Permitting Atlas Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State State Siting Act State Preemptive Authority Siting/Permitting Entities Permit Processing Timeframe Arizona None If TLSC finds compliance with local land use unreasonable or unfeasible, then the TLSC may grant a certificate Arizona Corporation Commission (ACC); Transmission Line Siting Committee (TLSC) 210-240 Days California Public Utilities Code Section 1001 Local jurisdictions are preempted from regulating electric power line projects California Public Utilities Commission (CPUC) 18 months

168

An Eddy-Permitting Southern Ocean State Estimate  

Science Conference Proceedings (OSTI)

An eddy-permitting general circulation model of the Southern Ocean is fit by constrained least squares to a large observational dataset during 200506. Data used include Argo float profiles, CTD synoptic sections, Southern Elephant Seals as ...

Matthew R. Mazloff; Patrick Heimbach; Carl Wunsch

2010-05-01T23:59:59.000Z

169

Presidential Permits - Procedures | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permits - Procedures Presidential Permits - Procedures Electricity Advisory Committee Technology Development Electricity Policy Coordination and Implementation Transmission...

170

Regulatory and Permitting Issues  

DOE Green Energy (OSTI)

As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

Larry Myer

2005-12-01T23:59:59.000Z

171

Orange County - Wind Permitting Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orange County - Wind Permitting Standards Orange County - Wind Permitting Standards Orange County - Wind Permitting Standards < Back Eligibility Agricultural Commercial Residential Savings Category Wind Buying & Making Electricity Program Info State California Program Type Solar/Wind Permitting Standards Provider OC Planning In December 2010, the County of Orange Board of Supervisors adopted small wind performance and development standards (Ord. No. 10-020) in order to promote distributed generation systems in non-urbanized areas (as defined in Government Code Section 65944(d)(2)) within the unincorporated territory. Permitting standards are for systems of 50 kW or less per customer site, for which the energy is primarily for on-site consumption. Height: For systems 45 feet tall or less, a use permit must be approved by

172

Individual Permit for Storm Water  

NLE Websites -- All DOE Office Websites (Extended Search)

Individual Permit Individual Permit Individual Permit for Storm Water The Individual Permit authorizes the discharge of storm water associated with historical industrial activities at LANL from specified solid waste management units and areas of concern, collectively referred to as Sites. October 15, 2012 Sandia Canyon Wetlands Sandia Canyon Wetlands in the early morning looking north. Get Expertise Environmental Communications & Public Involvement Email In the Individual Permit, to 'minimize' means to reduce and/or eliminate discharges of pollutants in storm water to the extent achievable. What is the Individual Permit for Storm Water? The Permit - NPDES No. NM0030759 - was issued by the U.S. Environmental Protection Agency, Region 6, on September 30, 2010 to Los Alamos National

173

Microsoft Word - Groundwater Discharge Permit  

NLE Websites -- All DOE Office Websites (Extended Search)

State Renews Groundwater Discharge Permit for WIPP CARLSBAD, N.M., September 11, 2008 - The New Mexico Environment Department (NMED) has renewed the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) groundwater discharge permit until 2013. The permit regulates the discharge of water from WIPP facilities and operations to lined ponds, which protect groundwater resources. The permit allows WIPP to discharge domestic wastewater, non-hazardous wastewater and storm water into 13 on-site, synthetically-lined ponds. The new permit also provides for increased daily discharge volumes to allow more flexibility in plant operations. "This permit is the result of a positive year-long effort with the New Mexico Groundwater Quality Bureau," said Jody Plum, DOE Carlsbad Field Office Permitting and

174

Air Pollution Control Permit to Construct and Permit to Operate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

may be required prior to commencing construction of the facility. Fuel-burning boilers, coal, oil, or natural gas-fired boiler steam generators require a permit. Gas...

175

Water Use Permitting (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permitting (Wisconsin) Water Use Permitting (Wisconsin) Eligibility Utility Program Information Start Date 2011 Wisconsin Program Type Siting and Permitting Withdrawers in the...

176

Expedited Permitting Process for Solar Photovoltaic Systems ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expedited Permitting Process for Solar Photovoltaic Systems (Vermont) Expedited Permitting Process for Solar Photovoltaic Systems (Vermont) Eligibility Agricultural Commercial...

177

Open Burning Permit Events Management  

E-Print Network (OSTI)

Open Burning Permit Events Management Form Revision Date: 09/29/2010 OpenBurningPermit.docx A Use being burned: (check all that apply) [ ] Small logs (less than 16 in. long) [ ] Finished Lumber________________________________ As the individual responsible for this event, I have read the attached Regulations for Open Burning. The sponsoring

Manning, Sturt

178

Presidential Permits and Export Authorizations - About the Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permits and Export Presidential Permits and Export Authorizations - About the Program Presidential Permits and Export Authorizations - About the Program The Federal international electricity program consists of two elements: 1.Granting Presidential permits for the construction, connection, operation and/or maintenance of electric transmission lines which cross the U.S. international border; and 2.Authorizing exports of electric energy to foreign countries. The authority to grant Presidential permits is derived from the constitutional power of the President to protect the territorial integrity of the United States. The authority to regulate the export of electric energy is based on the statutory authority contained in section 202(e) of the Federal Power Act (FPA). Executive Order 8202, issued by President Roosevelt in 1939, prohibited

179

Recent Bird Sightings at Fermilab  

NLE Websites -- All DOE Office Websites (Extended Search)

Recent Bird Sightings at Fermilab Recent Bird Sightings at Fermilab Author: Peter Kasper See the following link information concerning the Current Status of Access to Fermilab Summaries from past years .. '99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09 and past months .. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year List: Contains the list of birds seen so far this year. Seasonal List: The list of birds recorded on site at this time of year. Recent entries ... Dec 29 Dec 22 Dec 19 Dec 14 Dec 9 Dec 8 Dec 5 Dec 1 Nov 24 Nov 22 Nov 17 Nov 13 Nov 10 Nov 7 Nov 3 Nov 2 Oct 30 Oct 28 Oct 27 Oct 23 Oct 20 Oct 13 Oct 10 Oct 6 Oct 3 Oct 2 Sep 29 Sep 27 Sep 26 Sep 1 Aug 30 Aug 23 Aug 18 Aug 16 Aug 11 Aug 9 Aug 4 Aug 1 Jul 28 Jul 25 Jul 21 Jul 17 Jul 14 Jul 11 Jul 7 Jul 5 Jun 30 Jun 27

180

Air Pollution Control Permit to Construct and Permit to Operate...  

Open Energy Info (EERE)

to commencing construction of the facility. Fuel-burning boilers, coal, oil, or natural gas-fired boiler steam generators require a permit. Gas turbines, as well as simple cycle...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Presidential Permits | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Presidential Permits Presidential Permits Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits - Canada PRESIDENTIAL PERMITS - CANADA BACK TO TOP Docket No. Company Date Issued PP-6 Puget Sound Energy 04/28/81 PP-10 BPA 10/27/45 PP-10-1 BPA 11/30/65 PP-11-2 Fraser Papers 02/29/99 PP-11 Fraser Papers (Rescinded in PP-366) 11/18/10 PP-12 Maine 12/05/63 PP-13 NiMo Hogansburg 01/31/48 PP-18 Glacier Electric 12/12/52 PP-20 Eastern Maine 05/25/65 PP-22 BC Hydro 08/24/67 PP-22-1 BC Hydro 07/21/55 PP-22-2 BC Hydro 02/04/58 PP-22-3 BC Hydro 08/24/67 PP-22-4 BCTC 09/05/07 PP-23 Netley 07/20/55 PP-24 Long Sault 06/06/80 PP-25 NYPA 06/06/80 PP-28 Northern Electric 04/17/63

182

GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit | Open  

Open Energy Info (EERE)

10 - Did majority of RWQCB approve the permit 10 - Did majority of RWQCB approve the permit < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-b.10 - Did majority of RWQCB approve the permit Following the public hearing, the RWQCB votes on whether or not to approve the permit. The permit is approved with a majority vote. If the RWQCB denies the permit, the process ends. If the RWQCB votes to approve the permit, the permit is forwarded to the Environmental Protection Agency for approval. Estimated Time Clock.png 10 days0.0274 years 240 hours 1.429 weeks 0.329 months No explanation of time estimate. Logic Chain No Parents \V/ GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit (this page) \V/ No Dependents Under Development Add.png Add an Element

183

Well Permits (District of Columbia)  

Energy.gov (U.S. Department of Energy (DOE))

Well permits are required for the installation of wells in private and public space. Wells are defined as any trest hole, shaft, or soil excavation created by any means including, but not limited...

184

Local Bird Populations and "The Birds of Fermilab"  

NLE Websites -- All DOE Office Websites (Extended Search)

Local Bird Populations and "The Birds of Fermilab" Local Bird Populations and "The Birds of Fermilab" If you are a birder yourself, or if your students study birds you may want to keep up to date on the local bird populations. If you're new to birding this may be of even more interest. This article discusses some local resources and includes some tips from a Fermilab expert birder on how to begin. Peter Kasper, birding expert at Fermilab, and our featured physicist in this newsletter has an outstanding resource on the Internet, the Birds of Fermilab. If you have WWW access connect at: http://fnnews.fnal.gov/ecology/wildlife/list.html . Here Peter has reports of sightings of 252 species. The basis of the information on this site are two research periods during which Peter and Vicki Byre (while with the

185

European Section  

Science Conference Proceedings (OSTI)

European geographical region. European Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing research section service European Secti

186

File:03CACEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

CACEncroachmentPermit.pdf CACEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03CACEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 34 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:45, 19 November 2012 Thumbnail for version as of 12:45, 19 November 2012 1,275 × 1,650 (34 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-CA-c - Encroachment Permit

187

File:03UTFEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

UTFEncroachmentPermit.pdf UTFEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03UTFEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 40 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:15, 30 August 2012 Thumbnail for version as of 12:15, 30 August 2012 1,275 × 1,650 (40 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-UT-f - Encroachment Permit

188

File:04AKBGeophysicalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AKBGeophysicalExplorationPermit.pdf AKBGeophysicalExplorationPermit.pdf Jump to: navigation, search File File history File usage File:04AKBGeophysicalExplorationPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 62 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:38, 6 August 2012 Thumbnail for version as of 11:38, 6 August 2012 1,275 × 1,650 (62 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 4-AK-b - Geophysical Exploration Permit

189

File:06IDCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

IDCDrinkingWaterPermit.pdf IDCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06IDCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:14, 29 October 2012 Thumbnail for version as of 08:14, 29 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-ID-c - Drinking Water Permit Retrieved from

190

File:06MTCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

MTCDrinkingWaterPermit.pdf MTCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06MTCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 11 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:11, 1 October 2012 Thumbnail for version as of 11:11, 1 October 2012 1,275 × 1,650 (11 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-MT-c - Drinking Water Permit Retrieved from

191

File:06NVCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

6NVCDrinkingWaterPermit.pdf 6NVCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06NVCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:59, 15 October 2012 Thumbnail for version as of 15:59, 15 October 2012 1,275 × 1,650 (45 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-NV-c - Drinking Water Permit Retrieved from

192

File:06ORCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

6ORCDrinkingWaterPermit.pdf 6ORCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06ORCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 11 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:09, 28 September 2012 Thumbnail for version as of 12:09, 28 September 2012 1,275 × 1,650 (11 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-OR-c - Drinking Water Permit Retrieved from

193

File:03MTEEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

MTEEncroachmentPermit.pdf MTEEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03MTEEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 19 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:06, 1 October 2012 Thumbnail for version as of 12:06, 1 October 2012 1,275 × 1,650 (19 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-MT-e - Encroachment Permit

194

Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compressed Natural Gas Compressed Natural Gas (CNG) Tax and Permit to someone by E-mail Share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit on Facebook Tweet about Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit on Twitter Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit on Google Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit on Delicious Rank Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit on Digg Find More places to share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Tax and Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Compressed Natural Gas (CNG) Tax and Permit

195

Hanford facility dangerous waste permit application, PUREX storage tunnels  

SciTech Connect

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997.

Price, S.M.

1997-09-08T23:59:59.000Z

196

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

Atlas < Transmission Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California...

197

PP-16 Alendatory Permit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permit to construct, operate, and maintain electric transmission facilities at the U.S-Mexican border. PP-16 Alendatory Permit More Documents & Publications PP-16-1 UNS...

198

SRS seeks RCRA Hazardous Waste Permit Renewal  

NLE Websites -- All DOE Office Websites (Extended Search)

ery Act (RCRA) permit be renewed. The current permit for the Mixed Waste Storage Buildings (MWSB), Mixed Waste Man- agement Facility (MWMF), and Sanitary Landfill (SLF)...

199

Water Pollution Control Permit Regulations (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations outline the permits and permitting processes for point discharges to surface waters and outline the monitoring and reporting requirements.

200

Direct Discharge Permit (Vermont) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Discharge Permit (Vermont) Direct Discharge Permit (Vermont) Eligibility Utility Agricultural Investor-Owned Utility Industrial MunicipalPublic Utility Rural Electric Cooperative...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Wind Energy Permitting Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Energy Permitting Standards Wind Energy Permitting Standards < Back Eligibility Commercial Construction Industrial InstallerContractor Savings Category Wind Buying & Making...

202

Permits handbook for coal development  

SciTech Connect

This coal permits handbook was prepared for Region VIII comprised of the states of Colorado, Utah, Montana, Wyoming, North Dakota, and South Dakota. The first part of the handbook provides the background and overview of information on coal with emphasis on federal and state regulatory authority and includes a status report on litigation affecting the coal industry. A discussion on specific analyses of the majority of environmental permits required to operate and develop coal mines comprises the second part of the book. Significant supportive information including the content of state regulations and standards, sample forms, guidelines, and a discussion of coal severance taxation are included on the appendices. (BLM)

Wayman, C.H.; Genasci, G.A.

1980-01-01T23:59:59.000Z

203

Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

that use these areas include anhingas, great egrets, little blue herons, and bald eagles. A few species, including wood ducks, mallards, and great blue herons, are year-round...

204

Bird's Eggs - Their Size, Shape and Color  

NLE Websites -- All DOE Office Websites (Extended Search)

Search Engine Table of Contents Copyright Disclaimer Bird's Eggs - Their Size, Shape and Color Nature Bulletin No. 455-A April 29, 1972 Forest Preserve District of Cook...

205

Migratory Bird Treaty Act: Lessons Learned  

NLE Websites -- All DOE Office Websites (Extended Search)

January 17, 2013 1 THERESA ALDRIDGE, PACIFIC NORTHWEST SITE OFFICE NEPA Compliance Office Richland Washington Migratory Bird Treaty Act: Lessons Learned Along with 800 other...

206

Australasian Section  

Science Conference Proceedings (OSTI)

The Australasian Section brings together professionals in the Australia and Pacific Rim geographical regions. Australasian Section Sections achievement application award awards canadian distinguished division fats member membership memorial networ

207

Asian Section  

Science Conference Proceedings (OSTI)

Taiwan, Japan, and Korea geographical regions. Asian Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing research section service

208

Canadian Section  

Science Conference Proceedings (OSTI)

Bringing together professionals from Canadian geographical regions. Canadian Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing r

209

Permit Regulations for the Construction and, or Operation of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Type Environmental Regulations Siting & Permitting The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and...

210

General Air Permits (Louisiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Air Permits (Louisiana) General Air Permits (Louisiana) General Air Permits (Louisiana) < Back Eligibility Agricultural Construction Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Louisiana Program Type Environmental Regulations Provider Louisiana Department of Environmental Quality Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any regulated air pollutant do not need a permit. The Louisiana Department of Environmental Quality issues Title V General Permits. The permit is developed based on equipment types versus facility types, the general permits are not limited in their use to a specific industry or category. Title V permits combine

211

State Waste Discharge Permit application: 200-W Powerhouse Ash Pit  

Science Conference Proceedings (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

212

GRR/Elements/18-CA-c.10 - Draft Waste Discharge Permit | Open...  

Open Energy Info (EERE)

0 - Draft Waste Discharge Permit < GRR | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 18-CA-c.10 -...

213

USA Section  

Science Conference Proceedings (OSTI)

Section is made up of professionals in the USA. USA Section Membership Information achievement application award Awards distinguished division Divisions fats job Join lipid lipids Member member get a member Membership memorial nomination oils post

214

Indian Section  

Science Conference Proceedings (OSTI)

Bringing together professionals in the geographic area of India. Indian Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing resear

215

Construction Permits and Fees (New Mexico)  

Energy.gov (U.S. Department of Energy (DOE))

Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

216

Air Permitting for Stationary Sources (New Hampshire)  

Energy.gov (U.S. Department of Energy (DOE))

The permitting system implements the permitting requirements of RSA 125-C and 125-I to regulate the operation and modification of new and existing stationary sources, area sources, and devices to...

217

WIPP Hazardous Waste Permit - Approved Modifications  

NLE Websites -- All DOE Office Websites (Extended Search)

August 3, 2011 Class 1 Permit Modification Notification - Revise Tables 4.1.1 and G-1 dated August 8, 2011 Class 2 Permit Modification Request TRUPACT-III dated January 10, 2011...

218

Air permitting of IGCC plants  

SciTech Connect

The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

Chitikela, S.R.

2007-07-01T23:59:59.000Z

219

File:06UTBStormWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

UTBStormWaterPermit.pdf UTBStormWaterPermit.pdf Jump to: navigation, search File File history File usage File:06UTBStormWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 41 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:16, 30 August 2012 Thumbnail for version as of 12:16, 30 August 2012 1,275 × 1,650 (41 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-UT-b - Storm Water Permit Retrieved from "http://en.openei.org/w/index.php?title=File:06UTBStormWaterPermit.pdf&oldid=509118

220

Chernobyl Birds Have Smaller Brains  

E-Print Network (OSTI)

Background: Animals living in areas contaminated by radioactive material from Chernobyl suffer from increased oxidative stress and low levels of antioxidants. Therefore, normal development of the nervous system is jeopardized as reflected by high frequencies of developmental errors, reduced brain size and impaired cognitive abilities in humans. Alternatively, associations between psychological effects and radiation have been attributed to post-traumatic stress in humans. Methodology/Principal Finding: Here we used an extensive sample of 550 birds belonging to 48 species to test the prediction that even in the absence of post-traumatic stress, there is a negative association between relative brain size and level of background radiation. We found a negative association between brain size as reflected by external head volume and level of background radiation, independent of structural body size and body mass. The observed reduction in brain size in relation to background radiation amounted to 5 % across the range of almost a factor 5,000 in radiation level. Species differed significantly in reduction in brain size with increasing background radiation, and brain size was the only morphological character that showed a negative relationship with radiation. Brain size was significantly smaller in yearlings than in older individuals. Conclusions/Significance: Low dose radiation can have significant effects on normal brain development as reflected by brain size and therefore potentially cognitive ability. The fact that brain size was smaller in yearlings than in older individuals

Anders Pape Mller; Andea Bonisoli-alquati; Geir Rudolfsen; Timothy A. Mousseau

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Siting & Permitting | Open Energy Information  

Open Energy Info (EERE)

Siting & Permitting Siting & Permitting Jump to: navigation, search Siting and permitting policies can facilitate the installation of clean energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar projects. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] References ↑ DSIRE Glossary Retrieved from "http://en.openei.org/w/index.php?title=Siting_%26_Permitting&oldid=538321"

222

Annual Hanford Site Environmental Permitting status report  

Science Conference Proceedings (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

223

MEASURING IMPACTS TO BIRDS CAUSED BY WIND TURBINES MEASURING IMPACTS TO BIRDS CAUSED BY WIND TURBINES  

E-Print Network (OSTI)

APPENDIX A MEASURING IMPACTS TO BIRDS CAUSED BY WIND TURBINES #12;A-1 APPENDIX A MEASURING IMPACTS TO BIRDS CAUSED BY WIND TURBINES 1.0 INTRODUCTION Differential composition of wind turbines at wind energy used is the number of fatalities per wind turbine per year (Anderson et al. 1999). This metric has

224

CoalFleet IGCC Permitting Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance to owners of planned Integrated Gasification Combined Cycle (IGCC) power plants in order to assist them in permitting these advanced coal power generation facilities. The CoalFleet IGCC Permitting Guidelines summarize U.S. federal requirements for obtaining air, water, and solid waste permits for a generic IGCC facility, as described in EPRI report 1012227, the CoalFleet User Design Basis Specification (UDBS). The Guidelines present characteristics of IGCC emissions that mus...

2006-11-16T23:59:59.000Z

225

Wastewater Construction and Operation Permits (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

226

Aquatic Habitat Protection Permit (Saskatchewan, Canada) | Open...  

Open Energy Info (EERE)

aID5044&FilenameAquatic+Habitat+Protection+Permit+Application.pdf&lEnglish Summary The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of...

227

Disclosure of Permitted Communication Concerning Fossil Fuel...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No....

228

Permits for Electricity Generating Facilities (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

All applicants for conditional permits for electricity generating facilities must provide opportunity for public participation and quantify expected air emissions from the proposed project.

229

Washington Joint Aquatic Resources Permit Application (JARPA...  

Open Energy Info (EERE)

Washington Joint Aquatic Resources Permit Application (JARPA) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington Joint...

230

Solar Permitting Law (Oregon) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Oregon Program Type SolarWind Permitting...

231

Industrial Discharge Permits (District of Columbia)  

Energy.gov (U.S. Department of Energy (DOE))

All businesses and government agencies discharging process wastewater to the public sewer system must report their activities to DC Water's Pretreatment Center. Wastewater discharge permits are...

232

Section J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-1 Section J Appendix M Key Design, Licensing and Site Management M&O Milestone Chart Activity Planned Date Develop and Submit CD-2 (25%-30%) 082009 Submission of Construction...

233

SECTION M  

NLE Websites -- All DOE Office Websites (Extended Search)

using the policies and procedures in FAR Part 15 and DEAR Part 915. A Source Evaluation Board (SEB) will evaluate proposals using the criteria in this Section M. The Source...

234

Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility  

Science Conference Proceedings (OSTI)

The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

Not Available

1993-08-01T23:59:59.000Z

235

GRR/Section 5 - Drilling Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 5 - Drilling Overview GRR/Section 5 - Drilling Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5 - Drilling Overview 05DrillingPermittingOverview.pdf Click to View Fullscreen Contact Agencies BLM Regulations & Policies 30 USC § 1001 Triggers None specified On top of acquiring the correct drilling permits a developer needs to consider issues such as land and mineral ownership and right of way access. 05DrillingPermittingOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 5.1 - Review Potential Construction Permits In addition to drilling permits, the developer may require other

236

OpenEI Community - permitting  

Open Energy Info (EERE)

Texas Legal Review Texas Legal Review http://en.openei.org/community/blog/texas-legal-review The NREL roadmap team recently met with our legal team Brownstein Hyatt Farber and Schreck (www.bhfs.com) for a review of the Texas portion of the Geothermal Regulatory Roadmap (GRR).  BHFS provided excellent suggestions to the Section 3 flowcharts for geothermal leases on Texas state lands.  The Texas portion of the GRR now encompasses a flowchart for Texas state land leasing on Permanent School Fund Lands, Texas Parks and Wildlife Department Lands, Land Trade Lands, and Relinquishment Act Lands.  Additionally, BHFS provided many other helpful tips for clarifying other issue

237

Presidential Permits and Export Authorizations - About the Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permits and Export Authorizations - About the Program Presidential Permits and Export Authorizations - About the Program Electricity Advisory Committee Technology...

238

Coordinating Permit Office | OpenEI Community  

Open Energy Info (EERE)

Coordinating Permit Office Coordinating Permit Office Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand Sierra Resort in Reno, NV. The meeting was well-attended with over 40 attendees, including in-person and webinar attendance. Thanks to all who attended! Files: application/pdf icon Presentation: 3rd Quarterly Stakeholder Update Meeting application/vnd.openxmlformats-officedocument.presentationml.presentation icon Mock-up: GRR Permitting Wizard Interface Kyoung's picture Submitted by Kyoung(155)

239

Operating Permits (New Jersey) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating Permits (New Jersey) Operating Permits (New Jersey) Operating Permits (New Jersey) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State New Jersey Program Type Siting and Permitting Provider Department of Environmental Protection The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure that no person shall use or

240

HQ Work Control Permit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.10 Barriers and Postings 5/26/95 OSS 19.3 Confined Space Entry 5/23/95

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Solar Construction Permitting Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Solar Construction Permitting Standards < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Local Government Nonprofit Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Colorado Energy Office Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities have been free to assign their own fees for a permit. These fees can vary broadly in size across jurisdictions and in some cases, can be large enough

242

HQ Work Control Permit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.3 Confined Space Entry 5/23/95 WA_02_026_UNITED_TECHNOLOGIES_Waiver_of_Domestic_and_Foreign

243

Wind Project Permitting | Open Energy Information  

Open Energy Info (EERE)

Project Permitting Project Permitting Jump to: navigation, search Invenergy is the developer of the 129-MW Forward Wind Energy Center project near Fond du Lac, Wisconsin, that came online in 2008. Photo by Ruth Baranowski, NREL 16412 As with other energy facility permitting processes, the goal of the wind project permitting process is to reach decisions that are timely, minimize challenges, and ensure compliance with laws and regulations that provide for necessary environmental protection.[1] Resources National Wind Coordinating Committee. (2002). Permitting of Wind Energy Facilities. Accessed August 28, 2013. This handbook is written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public.

244

Section 36  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Cloud and Aerosol Height Distribution Retrieval and Analysis Employing Continuous Operation Lidar Data J. D. Spinhirne, D. L. Hlavka and V. S. Scott NASA/Goddard Space Flight Center Greenbelt, Maryland A. E. Galbraith and J. A. Reagan University of Arizona Tucson, Arizona Introduction Instrument New technology now permits ground-based lidar to operate The basis of the MPL design is the use of lasers with high full time and profile all significant aerosol and cloud structure pulse repetition frequencies (PRF) and low pulse energies. of the atmosphere up to the limit of signal attenuation. Such When highly efficient optics, filters, and detectors are used, it systems are in operation at U.S. Department of Energy (DOE) is possible to obtain profiling of all significant cloud and aero-

245

A Conservation Blueprint for Neotropical Migratory Birds in Western Colorado  

E-Print Network (OSTI)

A Conservation Blueprint for Neotropical Migratory Birds in Western Colorado Michelle Fink, David opportunities for conservation of Neotropical migratory birds in coniferous and aspen forest habitats in Western, and SPOT, a conservation portfolio optimization software, to analyze information about bird distribution

246

CHAPTER XVIII THE BIRDS OF THE GULF OF MEXICO  

E-Print Network (OSTI)

CHAPTER XVIII THE BIRDS OF THE GULF OF MEXICO #12;Blank page retained for pagination #12;THE BIRDS. The birds of the Gulf of Mexico are thus, without exception, adapted to at least two media and endowed difficult, the area de- ~Ilnited by the salt water of the Gulf of Mexico as It twice daily moves landward

247

Section J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L-1 L-1 Section J Appendix L MEMORANDUM FROM DAVID R. HILL, GENERAL COUNSEL, DATED NOVEMBER 30, 2006, SUBJECT: ONGOING LICENSING SUPPORT NETWORK ("LSN") OBLIGATIONS Contract No.: DE-RW0000005 QA:QA J-L-2 Contract No.: DE-RW0000005 QA:QA J-L-3 Contract No.: DE-RW0000005

248

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012  

SciTech Connect

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

Vigil-Holterman, Luciana R. [Los Alamos National Laboratory; Lechel, Robert A. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

249

Amended Application for Presidential Permit OE Docket No: PP-371 Northern  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC LLC Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC Northern Pass Transmission LLC (Northern Pass) has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada. Amended Application of Northern Pass Transmission LLC for Presidential Permit Exhibit 1 - Opinion of Counsel Exhibit 2 - General Area Map of Proposed Route Exhibit 3 - Diagrams of Cross-Section of Underground Cables Exhibit 4 - Drawings of Typical Structure Configurations Exhibit 5 - Chart of Proposed Structure Heights Exhibit 6 - Drawing of Typical Converter Terminal Exhibit 7 - General Area Map of North Section Exhibit 8 - General Area Map of Central Section

250

Section 66  

NLE Websites -- All DOE Office Websites (Extended Search)

CFCl CFCl 3 ) (CF 2 Cl 2 ) (CHFCl 2 ) CF 4 CCl 4 (CFCl 3 ) (CF 2 Cl 2 ) (CHFCl 2 ) SF 6 CF 4 CCl 4 Session Papers 277 Figure 1. Spectral absorption cross-sections of CF 4 between 1281 and 1284 cm . The experimental -1 conditions correspond to the surface, 5-km, and 19-km levels of the U.S. Standard Atmosphere. Figure 2. Spectral absorption cross-sections of CCl 4 between 755 and 810 cm . The experimental conditions -1 correspond to the surface, 5-km, and 19-km levels of the U.S. Standard Atmosphere. Laboratory Spectroscopy in Support of the Atmospheric Radiation Measurement Program P. Varanasi Institute for Terrestrial and Planetary Atmospheres The University at Stony Brook Stony Brook, New York There is considerable world-wide interest in the remote sensing of chlorofluorocarbons (CFCs), especially CFC-11

251

Disclosure of Permitted Communication Concerning Regional Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Disclosure of Permitted Communication Concerning Regional Standards Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No. EERE-2011-BT-CE-0077 Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No. EERE-2011-BT-CE-0077 This memo provides an overview of communications made to DOE staff on the subject of a policy for providing waivers from new regional furnace efficiency standards. memo_furnace_std_waiver_policy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Record of Communication Concerning Ceiling Fan and Ceiling Fan Light Kit

252

Wind Energy Permitting Standards (North Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

North Carolina has statewide permitting requirements for wind energy facilities. Any wind turbine or collection of wind turbines located within a half mile of each other with a collective rated...

253

Regulations and Permits Related to Dams (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

254

Catawba County - Green Construction Permitting Incentive Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(LEED), NC HealthyBuilt Homes, Energy Star, or the National Association of Home Builders' Model Green Home Building Guidelines can receive a 25% blanket permit fee rebate, not to...

255

Battling bird flu by the numbers  

NLE Websites -- All DOE Office Websites (Extended Search)

May » May » Battling bird flu by the numbers Battling bird flu by the numbers Lab theorists have developed a mathematical tool that could help health experts and crisis managers determine in real time whether an emerging infectious disease such as avian influenza H5N1 is poised to spread globally. May 27, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

256

SECTION J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J-F-1 SECTION J APPENDIX F CRITICAL STAFF Subject Matter Expert Subject Matter Canister Transfer Machine Engineering Waste Package Transfer Trolley Engineering Transport and Emplacement Vehicle Engineering Cask Transfer Trolley Engineering Criticality and Nuclear Engineering Subsurface Thermal Management Engineering Pre-closure Safety Analysis Specialist Waste Package and Drip Shields Engineering Waste Package Closure System Engineering NOG-1 Cranes Engineering Subsurface Design Engineering Structural Seismic Design Engineering Transport, Aging, and Disposal (TAD) interface with repository systems Note: The Contractor shall identify names of at least one individual which shall function in each of the subject matter areas identified above. Qualification requirements for these individuals are

257

SECTION J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D-1 D-1 SECTION J APPENDIX D KEY PERSONNEL Name Position Doug Cooper General Manager John Donnell Repository Licensing Lead Al Ebner, PE, PhD Repository Design Lead Steve Piccolo Deputy General Manager Steve White Quality & Performance Assurance Lead George Clare Project Management & Integration Lead Mike Hitchler Preclosure Safety Analysis Lead Contract No.: DE-RW0000005 QA:QA J-D-2 POSITION DESCRIPTIONS OCRWM SPECIFIED KEY PERSONNEL 1. General Manager: Requires 10 years experience as a Senior Manager, responsible for the licensing and/or design and/or operation of a large complex nuclear facility. Must have experience as a

258

Major Source Permits (District of Columbia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major Source Permits (District of Columbia) Major Source Permits (District of Columbia) Major Source Permits (District of Columbia) < Back Eligibility Utility Commercial Industrial Program Info State District of Columbia Program Type Environmental Regulations Provider District Department of the Environment The District reviews designs for new pollution sources and design modifications for existing sources. Permits are issued to allow sources to emit limited and specified amounts of pollution as allowed by air quality laws and regulations. Major sources include power plants, heating plants, and large printing facilities. Three types of permits are issued: pre-construction review permits; new source review permits; and operating permits. These permits include conditions intended to minimize emissions of

259

SECTION THIRTY SEVEN Consultants Section Thirty Seven Consultants, Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THIRTY SEVEN THIRTY SEVEN Consultants Section Thirty Seven Consultants, Inc. A California Corporation 1 DEPARTMENT OF ENERGY [OE Docket No. RRTT-IR-001] Rapid Response Team for Transmission AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy, DoE. ACTION: Request for information. (1) The development timelines for generation and attendant transmission are often not coordinated or run concurrently. Because of the lengthy time to obtain regulatory reviews, permits and approvals (collectively ''Regulatory Permits''), major new transmission lines can take significantly longer to develop than some types of generation to which the transmission would connect. This Request for Information will refer to the difference in development times between generation and transmission as

260

Section 19  

NLE Websites -- All DOE Office Websites (Extended Search)

Observations and Applications of Data Taken with the Observations and Applications of Data Taken with the Cloud Profiling Radar System J. M. Firda, S. M. Sekelsky, S. P. Lohmeier, R. E. McIntosh Microwave Remote Sensing Laboratory, University of Massachusetts Amherst, Massachusetts Introduction During the past year, the University of Massachusetts' Cloud Profiling Radar System (CPRS) team has been active in collecting and processing data. Participation in several field campaigns has produced new and interesting data sets. A classification software was also developed using rule-based techniques and neural networks to identify cloud particles. This paper describes the activities of CPRS from March of 1995 to March of 1996. In the first section, involvement in field experiments is briefly described. This is followed by a

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Section Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. List A Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations, unless relief has been granted in writing by the appropriate regulatory agency. Omission of any applicable law or regulation from this list does not affect the obligation of the contractor to comply with such law or regulation. Laws & Regulations Title 10 CFR Part 2 Rules of Practice for Domestic Licensing Proceedings and Issuance of Orders

262

SECTION J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H-1 H-1 SECTION J APPENDIX H CONTRACT GUIDANCE FOR PREPARATION OF DIVERSITY PLAN This Guidance is to assist the Contractor in understanding the information being sought by the Department for each of the Diversity elements and where these issues may already be addressed in the contract. To the extent these issues are already addressed in the contract, the Contractor need only cross reference the location. Contractor's Workforce The Department's contracts contain clauses on Equal Employment Opportunity (EEO) and Affirmative Action (AA). The Plan may discuss how the contractor has or plans to establish and maintain result-oriented EEO and AA programs in accordance with the requirements of these clauses, and how the contractor's organization includes

263

Section J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-1 M-1 Section J Appendix M Key Design, Licensing and Site Management M&O Milestone Chart Activity Planned Date Develop and Submit CD-2 (25%-30%) 08/2009 Submission of Construction Performance Specifications - Balance of Plant Support Facilities (OCRWM Start of Construction 3/2012) TBD Submission of Construction Performance Specifications - Initial Handling Facility (IHF) (OCRWM Start of Construction for IHF: 9/2013) TBD Submission of Construction Performance Specifications - Wet Handling Facility (WHF) (OCRWM Start of Construction for WHF: 12/2012) TBD Submission of Construction Performance Specifications - Canister Receipt and Closure Facility (CRCF) (OCRWM Start of Construction for CRCF-1: 10/2011) TBD Submission of Construction Performance Specifications - Panel 1

264

File:03UTGGrantOfAccessPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

UTGGrantOfAccessPermit.pdf UTGGrantOfAccessPermit.pdf Jump to: navigation, search File File history File usage File:03UTGGrantOfAccessPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 58 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:15, 30 August 2012 Thumbnail for version as of 12:15, 30 August 2012 1,275 × 1,650 (58 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-UT-g - Grant of Access Permit

265

File:06HIBHawaiiConstructionStormWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

HIBHawaiiConstructionStormWaterPermit.pdf HIBHawaiiConstructionStormWaterPermit.pdf Jump to: navigation, search File File history File usage File:06HIBHawaiiConstructionStormWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 40 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:59, 23 October 2012 Thumbnail for version as of 11:59, 23 October 2012 1,275 × 1,650 (40 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-HI-b - Hawaii Construction Storm Water Permit

266

File:04ORDExplorationInjectionPermit (1).pdf | Open Energy Information  

Open Energy Info (EERE)

ORDExplorationInjectionPermit (1).pdf ORDExplorationInjectionPermit (1).pdf Jump to: navigation, search File File history File usage File:04ORDExplorationInjectionPermit (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 54 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:04, 28 September 2012 Thumbnail for version as of 12:04, 28 September 2012 1,275 × 1,650 (54 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 4-OR-d - Exploration Injection Permit

267

File:06TXAExtraLegalVehiclePermittingProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

TXAExtraLegalVehiclePermittingProcess.pdf TXAExtraLegalVehiclePermittingProcess.pdf Jump to: navigation, search File File history File usage Metadata File:06TXAExtraLegalVehiclePermittingProcess.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 43 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 09:13, 10 June 2013 Thumbnail for version as of 09:13, 10 June 2013 1,275 × 1,650 (43 KB) Abergfel (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-TX-a - Extra-Legal Vehicle Permitting Process

268

GRR/Elements/14-CA-b.1 - NPDES Permit Application | Open Energy Information  

Open Energy Info (EERE)

GRR/Elements/14-CA-b.1 - NPDES Permit Application GRR/Elements/14-CA-b.1 - NPDES Permit Application < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-b.1 - NPDES Permit Application The National Pollutant Discharge Elimination System permit is filed using a Form 200 for discharges of any pollutant from a point source into a body of water. The application is submitted to the applicable RWQCB. Because there is a federal component of the NPDES process one or more additional forms may be required: Form 1 General information completed in conjunction with Forms 2B, 2C, 2D, 2E, 2F, Standard Form 2A Form 2A Publicly-Owned Treatment Works Form 2B Concentrated animal feeding operations and aquatic animal production facilities. New applications or renewals

269

GRR/Section 14-WA-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-d - Section 401 Water Quality Certification GRR/Section 14-WA-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-d - Section 401 Water Quality Certification 14-WA-d - 401 Water Quality Certification.pdf Click to View Fullscreen Contact Agencies U S Army Corps of Engineers Washington State Department of Ecology Regulations & Policies Revised Statute of Washington Chapter 90.48 Washington Administrative Code Chapter 173-201A Washington Administrative Code 173-225-030 Triggers None specified Developers requiring a Section 404 Dredge and Fill Permit from the U S Army Corps of Engineers (Corps) are required to obtain a Section 401 Water Quality Certification from the state of Washington. The Washington State

270

GRR/Section 14-UT-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-UT-d - Section 401 Water Quality Certification GRR/Section 14-UT-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-UT-d - Section 401 Water Quality Certification 14-UT-d - Section 401 Water Quality Certification.pdf Click to View Fullscreen Triggers None specified Section 401 of the Clean Water Act (CWA) requires a Water Quality Certification for any federal license or permit that is issued to construct or operate a facility, which may result in any fill or discharge into the navigable waters of the United States. The Utah Division of Water Quality oversees the 401 Water Quality Certification process in the state of Utah. The director of the Utah Division of Water Quality ("director") handles

271

U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

272

Wind Access and Permitting Law | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access and Permitting Law Wind Access and Permitting Law < Back Eligibility Residential Savings Category Wind Buying & Making Electricity Program Info State Delaware Program Type...

273

Form GWS-45 - Well Permit Application | Open Energy Information  

Open Energy Info (EERE)

Form GWS-45 - Well Permit Application Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Form GWS-45 - Well Permit Application Details Activities (0)...

274

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro:...

275

City of Portland - Streamlined Building Permits for Residential...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon City of Portland - Streamlined Building Permits for Residential Solar Systems (Oregon) SolarWind Permitting Standards...

276

City of San Jose - Photovoltaic Permit Requirements (California...  

Open Energy Info (EERE)

Jose - Solar Hot Water Heaters & Photovoltaic Systems Permit Requirements Incentive Type SolarWind Permitting Standards Applicable Sector Commercial, Construction, Industrial,...

277

Clark County - Solar and Wind Building Permit Guides (Nevada...  

Open Energy Info (EERE)

and commercial wind projects must submit commercial electrical sub permit applications. Solar permit applications must include minimum electric design information to confirm that...

278

Application for presidential permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc Application for presidential permit OE Docket No. PP-362...

279

City of Chicago - Green Permit and Green Homes Programs | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home Savings City of Chicago - Green Permit and Green Homes Programs City of Chicago - Green Permit and Green Homes...

280

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Improving Performance of Federal Permitting and Review of Infrastructu...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improving Performance of Federal Permitting and Review of Infrastructure Projects Improving Performance of Federal Permitting and Review of Infrastructure Projects Electricity...

282

Amendment of Water Rights Permit | Open Energy Information  

Open Energy Info (EERE)

Amendment of Water Rights Permit Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Amendment of Water Rights Permit Details Activities (0) Areas (0)...

283

Westinghouse and Fuzhou Permitted to Restart Distribution of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products August 6, 2010 -...

284

EIS-0463: Presidential Permit Application for Northern Pass Transmissi...  

NLE Websites -- All DOE Office Websites (Extended Search)

63: Presidential Permit Application for Northern Pass Transmission, New Hampshire EIS-0463: Presidential Permit Application for Northern Pass Transmission, New Hampshire Summary...

285

Coordination of Federal Transmission Permitting on Federal Lands...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the...

286

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal...

287

Air Quality Approvals and Permits (New Brunswick, Canada) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Quality Approvals and Permits (New Brunswick, Canada) Air Quality Approvals and Permits (New Brunswick, Canada) Eligibility Commercial Construction Developer Industrial...

288

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket...

289

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from...

290

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket...

291

Underground Injection Control Permits and Registrations (Texas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Underground Injection Control Permits and Registrations (Texas) Underground Injection Control Permits and Registrations (Texas) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Fuel Distributor Savings Category Buying & Making Electricity Program Info State Texas Program Type Environmental Regulations Safety and Operational Guidelines Provider Texas Commission on Environmental Quality Chapter 27 of the Texas Water Code (the Injection Well Act) defines an "injection well" as "an artificial excavation or opening in the ground made by digging, boring, drilling, jetting, driving, or some other

292

Property:GRR/SectionNumber | Open Energy Information  

Open Energy Info (EERE)

SectionNumber SectionNumber Jump to: navigation, search Property Name GRR/SectionNumber Property Type Number Description The section number of a section in the Geothermal Regulatory Roadmap. The value of this property is derived automatically by the section template and is used in sorting sections on the GRR Home page. Subproperties This property has the following 2 subproperties: G GRR/Section 6-HI-d - Oversize and/or Overweight Vehicles and Loads Permit GRR/Section 7 - Power Plant Siting/Construction Overview Pages using the property "GRR/SectionNumber" Showing 25 pages using this property. (previous 25) (next 25) G GRR/Section 1 - Land Use Overview + 1 + GRR/Section 1-AK-a - Land Use Considerations + 1 + GRR/Section 1-CA-a - State Land Use Planning + 1 +

293

Permitting of Wind Energy Facilities: A Handbook  

DOE Green Energy (OSTI)

This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

NWCC Siting Work Group

2002-08-01T23:59:59.000Z

294

Renewable Energy Permitting Barriers in Hawaii: Experience from the Field  

Science Conference Proceedings (OSTI)

This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

2013-03-01T23:59:59.000Z

295

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

296

Marienne S. de Villiers Birds and Environmental Change  

E-Print Network (OSTI)

's eastern Nama Karoo region and survival and repro- duction in South Africa's national bird, the blue crane to specialised fynbos and karoo habitats. The birds rely on natural vegetation for protection, and avoid. Although korhaans still occur in parts of the karoo and fynbos biomes, they are now harder to find

de Villiers, Marienne

297

Quality Assessment of Weather Radar Wind Profiles during Bird Migration  

Science Conference Proceedings (OSTI)

Wind profiles from an operational C-band Doppler radar have been combined with data from a bird tracking radar to assess the wind profile quality during bird migration. The weather radar wind profiles (WRWPs) are retrieved using the well-known ...

Iwan Holleman; Hans van Gasteren; Willem Bouten

2008-12-01T23:59:59.000Z

298

Hazardous Waste Facility Permit Public Comments to Community Relations Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Last saved on: 7/22/2011 Final CRP comment for June 2011 1 SECTION TEXT COMMENT POST? GENERAL COMMENTS N/A We urge the DOE, NNSA and LANL to establish a community calendar so that the various LANL organizations who are scheduling public meetings are aware of other community events, such as the public comment periods on various documents, including PMRs, semi-annual meetings (e.g., CMRR and storm water permit meetings), Northern New Mexico Citizens' Advisory Board meetings, RACER, New Mexico Community Foundation FEED meetings, tours, etc. Such a community calendar would be an efficient and effective way to reduce the back and forth about the need for extensions of time and requests to reschedule meetings. It

299

Transverse section radionuclide scanning system  

DOE Patents (OSTI)

This invention provides a transverse section radionuclide scanning system for high-sensitivity quantification of brain radioactivity in cross-section picture format in order to permit accurate assessment of regional brain function localized in three-dimensions. High sensitivity crucially depends on overcoming the heretofore known raster type scanning, which requires back and forth detector movement involving dead-time or partial enclosure of the scan field. Accordingly, this invention provides a detector array having no back and forth movement by interlaced detectors that enclose the scan field and rotate as an integral unit around one axis of rotation in a slip ring that continuously transmits the detector data by means of laser emitting diodes, with the advantages that increased amounts of data can be continuously collected, processed and displayed with increased sensitivity according to a suitable computer program.

Kuhl, David E. (Rosemont, PA); Edwards, Roy Q. (Plymouth Township, PA)

1976-01-01T23:59:59.000Z

300

Symmetric Long Straight Section Lattices  

NLE Websites -- All DOE Office Websites (Extended Search)

Symmetric Symmetric Long Straight Section Lattices for 2, 4, and 8 Sectors formerly AOP-TN-2009-007, Rev. 2 Michael Borland March 23, 2009 Accelerator Systems Division, Advanced Photon Source 1 Introduction Long straight sections [1] (LSS) are anticipated to be one of the significant changes to the accel- erator as part of the APS Renewal. Previously [2], we developed a lattice with eight LSS that, while workable, would have presented some operational challenges. In the present note, we show improved results for 8LSS, along with new solutions for 4LSS and 2LSS. As before, these lattices are developed by removing the Q2 quadrupoles and moving the Q1 back into its place, permitting a 7.7-m-long insertion device (as judged by the increase in face-to-face distance for the innermost powered quadrupoles). Further increases in length (perhaps 10%) might be possible by removing corrector magnets,

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Early Site Permit Model Program Plan  

Science Conference Proceedings (OSTI)

"The Early Site Permit (ESP) Model Program Plan (MPP)" provides step-by-step guidelines on preparing an ESP application. The Plan identifies work tasks necessary to prepare the application and guides applicants on effectively planning and managing the ESP program, including identifying and managing subcontracted resources. A model program plan details how to prepare applications. The MPP also describes interfaces among tasks and provides a generic schedule for executing the steps in preparing an ESP appl...

2002-06-12T23:59:59.000Z

302

Hanford Site air operating permit application  

SciTech Connect

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

303

WIPP Hazardous Waste Facility Permit - 2008 Update  

Science Conference Proceedings (OSTI)

Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be submitted 180-days before the expiration date of the HWFP. At that time, the WIPP will request only one significant change, the permitting of Panel 8 to receive TRU mixed waste. (author)

Kehrman, R.F.; Most, W.A. [Washington Regulatory and Environmental Services, Carlsbad, New Mexico (United States)

2008-07-01T23:59:59.000Z

304

Broward County Online Solar Permitting (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Broward County Online Solar Permitting (Florida) Broward County Online Solar Permitting (Florida) Broward County Online Solar Permitting (Florida) < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Program Info State Florida Program Type Solar/Wind Permitting Standards Provider Unincorporated Broward County Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that are governed by a participating municipality. The online permitting system is designed to provide a one-stop solar permitting process with a single application form, electronic review and approval, and flat fee. Applicants can use this system to choose from pre-approved and pre-engineered solar panel mounting installation designs,

305

Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Kentucky Program Type Environmental Regulations Siting and Permitting Provider Kentucky Department for Environmental Protection Kentucky Administrative Regulation Chapter 52, entitled Air Quality: Permits, Registrations, and Prohibitory Rules, is promulgated under the authority of the Division of Air Quality within the Energy and Environment Cabinet's Department for Environmental Protection. Chapter 52 outlines the permitting requirements for all air pollution sources within the state;

306

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Investor-Owned Utility Municipal/Public Utility Utility Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection Division prior to any petroleum or petroleum product pipe company acquiring property or interests by eminent domain. Monitoring conditions will be issued with

307

General Conditions Applicable to Water Discharge Permits and Procedures and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Conditions Applicable to Water Discharge Permits and General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut) General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection

308

Australasian Section Newsletter  

Science Conference Proceedings (OSTI)

Read the Australasian Section Newsletter. Australasian Section Newsletter Australasian Section aaocs aocs australasian Australasian Sections Australia award awards excellence fats global inform job listings member membership network oils Pacific Rim Prof

309

ORNI 9, LLC, AND ORMAT NEVADA INC. APPLICATIONS FOR PERMIT TO DRILL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNI 9, LLC, AND ORMAT NEVADA INC. ORNI 9, LLC, AND ORMAT NEVADA INC. APPLICATIONS FOR PERMIT TO DRILL GEOTHERMAL OBSERVATION WELLS 82-14 AND 55-14 AND GEOTHERMAL PRODUCTION WELL 15-12 AND POSSIBLE FUTURE GEOTHERMAL WELLS LOCATED IN SECTIONS 12, and 14, T22N, R26E, MDB&M BLM Geothermal Leases NVN-065558 and NVN-065561 BLM Environmental Assessment No. NV-020-05-07 CONDITIONS OF APPROVAL 1. This approval is contingent upon the lessee/operator being in receipt of and in compliance with all appropriate federal, state, and local permits. 2. When cultural or paleontological resources, including but not limited to historic ruins, prehistoric artifacts and fossils, are discovered in the performance of the permit, the resources shall be left intact and immediately brought to the attention of the BLM authorized officer.

310

PERMITTING LEADERSHIP IN THE UNITED STATES  

SciTech Connect

In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical assistance to evaluate DOE's cleanup plans. In addition, the PLUS program has facilitated the involvement of key regulators from host-states beyond the Southern region.

Ken Nemeth

2002-09-01T23:59:59.000Z

311

Studying Wind Energy/Bird Interactions: A Guidance Document  

DOE Green Energy (OSTI)

This guidance document is a product of the Avian Subcommittee of the National Wind Coordinating Committee (NWCC). The NWCC was formed to better understand and promote responsible, credible, and comparable avian/wind energy interaction studies. Bird mortality is a concern and wind power is a potential clean and green source of electricity, making study of wind energy/bird interactions essential. This document provides an overview for regulators and stakeholders concerned with wind energy/bird interactions, as well as a more technical discussion of the basic concepts and tools for studying such interactions.

Anderson, R. [California Energy Commission (US); Morrison, M. [California State Univ., Sacramento, CA (US); Sinclair, K. [Dept. of Energy/National Renewable Energy Lab. (US); Strickland, D. [WEST, Inc. (US)

1999-12-01T23:59:59.000Z

312

Permitting Guidance for Biomass Power Plants  

Science Conference Proceedings (OSTI)

Biomass power plants could contribute significantly to reaching U.S. targets for renewable energy and greenhouse gas emissions reduction. Achieving these goals will require the construction of many new biomass-fired units, as well as the conversion of existing coal-fired units to biomass combustion or co-fired units. New biomass units will require air, water use, wastewater, and, in some cases, solid waste permits. Existing fossil fuel-fired units that will be converted to dedicated biomass-fired units o...

2011-05-12T23:59:59.000Z

313

Solar and Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Contents 1 Solar/Wind Permitting Standards Incentives 2 References Solar/Wind Permitting Standards Incentives

314

SunShot Initiative: Permitting, Interconnection, and Inspection  

NLE Websites -- All DOE Office Websites (Extended Search)

paper with PERMIT in the center. 2011 SunRun report estimated that permitting fees for a rooftop solar energy system cost an average of 2,500, though prices vary widely between...

315

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand...

316

Application for Presidential Permit OE Docket No. PP-235 Sempra...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sempra Energy Resources Application for presidential permit OE Docket No. PP-235-1 Sempra Energy Resources and Termoelectrica U.S LLC Application for Presidential Permit OE Docket...

317

Application for presidential permit OE Docket No. PP-334 Baja...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Application for presidential permit OE Docket No....

318

Testing the efficiency of a tradeable permits market  

E-Print Network (OSTI)

A tradeable permits market is said to be efficient when all affected firms trade permits until their marginal costs equal the market price. Detailed firm-level data are generally required to perform such an efficiency test, ...

Montero, Juan-Pablo

2002-01-01T23:59:59.000Z

319

Exclusionary manipulation of carbon permit markets: a laboratory test  

E-Print Network (OSTI)

The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

Carln, Bjrn.

320

Permit Fees for Hazardous Waste Material Management (Connecticut...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Material Management (Connecticut) Permit Fees for Hazardous Waste Material Management (Connecticut) Eligibility Agricultural Commercial Construction Fed. Government...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Bird Migration and Bias of WSR-88D Wind Estimates  

Science Conference Proceedings (OSTI)

Migrating birds can greatly influence base velocity, velocity azimuth display (VAD), and VAD wind profile products of the WSR-88D. This is documented by comparing estimates of wind velocity and direction from these products with corresponding ...

Sidney A. Gauthreaux Jr.; David S. Mizrahi; Carroll G. Belser

1998-06-01T23:59:59.000Z

322

SLAC National Accelerator Laboratory - Seen Above SLAC: A Bird...  

NLE Websites -- All DOE Office Websites (Extended Search)

Seen Above SLAC: A Bird's-Eye View of the Lab By Mike Ross February 8, 2012 About 50 new aerial photos of SLAC National Accelerator Laboratory have been added to the lab's Flickr...

323

Removal of bird contamination in wind profiler signal spectra.  

DOE Green Energy (OSTI)

The problem of bird interference with radar performance is as old as radar itself; however, the problem specific to wind profiler operation has not drawn the attention of researchers until the last 5 or 6 years. Since then, the problem has been addressed in many publications and several ways to solve it have been indicated. Recent advances in radar hardware and software made the last generation of profilers much more immune to bird contamination. However, many older profilers are still in use; errors in averaged (hourly) winds due to bird interference may be as high as 15 m/s. The objective of the present study is to develop a practical method to derive mean winds from averaged spectral data of a 915-MHz wind profiler under the condition of bird contamination.

Pekour, M. S.

1998-06-05T23:59:59.000Z

324

A Comparative Analysis of the Influence of Weather on the Flight Altitudes of Birds  

Science Conference Proceedings (OSTI)

Birds pose a serious risk to flight safety worldwide. A Bird Avoidance Model (BAM) is being developed in the Netherlands to reduce the risk of birdaircraft collisions. In order to develop a temporally and spatially dynamic model of bird ...

Judy Shamoun-Baranes; Emiel van Loon; Hans van Gasteren; Jelmer van Belle; Willem Bouten; Luit Buurma

2006-01-01T23:59:59.000Z

325

CoalFleet Advanced Combustion IGCC Permits Database  

Science Conference Proceedings (OSTI)

The CoalFleet Advanced Combustion IGCC Permits Database presents comprehensive information on permitting requirements and permit conditions for Integrated Gasification Combined Cycle (IGCC) power plants in an online database format. This Technical Update is a compilation of the Database contents as of March 31, 2008.

2008-04-11T23:59:59.000Z

326

Regulatory Review of Early Site Permit Applications  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

Scott, Michael L. [Senior Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2004-07-01T23:59:59.000Z

327

Biotechnology Regulatory Services public data file (permits, notifications,  

NLE Websites -- All DOE Office Websites (Extended Search)

Biotechnology Regulatory Services public data file (permits, notifications, Biotechnology Regulatory Services public data file (permits, notifications, and petitions) Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Biotechnology Regulatory Services public data file (permits, notifications, and petitions) Dataset Summary Description Public information on BRS applications for genetically engineered permits, notifications, and petitions. Tags {BRS,Permits,Notifications,Petitions,GE,"Agronomic Properties","Bacterial Resistance","Fungal Resistance","Herbicide Tolerance","Insect Resistance","Marker Gene","Nematode Resistance","Product Quality","Virus Resistance",Institution,Article,Phenotypes,"Genotypes "}

328

City of Portland - Streamlined Building Permits for Residential Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Oregon Program Type Solar/Wind Permitting Standards Provider City of Portland The City of Portland's Bureau of Development Services (BDS) developed an electronic permitting process for residential solar energy system installations. With this streamlined, expedited process, solar contractors can submit the project plans and permit application online for residential installations. In order to file the online application, the contractor must first be trained. The City of Portland has staff at the permitting desk trained as solar experts to assist solar contractors who need help filing their permits in person. This process has a turnaround time of

329

Storm Water Discharge Permits (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storm Water Discharge Permits (Wisconsin) Storm Water Discharge Permits (Wisconsin) Storm Water Discharge Permits (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info Start Date 08/2004 State Wisconsin Program Type Siting and Permitting Provider Department of Natural Resources Wisconsin's storm water runoff regulations include permitting requirements for construction sites and industrial facilities, including those

330

Hazardous Waste Transporter Permits (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hazardous Waste Transporter Permits (Connecticut) Hazardous Waste Transporter Permits (Connecticut) Hazardous Waste Transporter Permits (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection Transportation of hazardous wastes into or through the State of Connecticut requires a permit. Some exceptions apply. The regulations provide

331

Aquatic Habitat Protection Permit (Saskatchewan, Canada) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aquatic Habitat Protection Permit (Saskatchewan, Canada) Aquatic Habitat Protection Permit (Saskatchewan, Canada) Aquatic Habitat Protection Permit (Saskatchewan, Canada) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Rural Electric Cooperative Schools Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Saskatchewan Program Type Environmental Regulations Siting and Permitting Provider Saskatchewan Ministry of the Environment The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of aquatic habitat and states that a permit is required: to

332

Microsoft Word - 11-0702 _WRES 11-103 Att._ _Notification of Planned Change to the Permitted Facility_TRUPACT-III_  

NLE Websites -- All DOE Office Websites (Extended Search)

0, 2011 0, 2011 New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Notification of Planned Change to the Permitted Facility to Support TRUPACT-1I1 Dear Mr. Bearzi: The purpose of this letter is to notify you of planned changes to the permitted facility in accordance with the Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Part 1, General Permit Conditions, Section 1.7.11 .1, Reporting Planned Changes. The changes to the permitted facility are planned to occur during the current maintenance outage, and are described in the enclosed Notification of Planned Change to the Permitted Facility-Waste Isolation Pilot Plant. If you have any questions regarding this notification, please contact George Basabilvazo

333

Microsoft Word - 11-0702 _WRES 11-103 Att._ _Notification of Planned Change to the Permitted Facility_TRUPACT-III_  

NLE Websites -- All DOE Office Websites (Extended Search)

January 10, 2011 January 10, 2011 Mr. James Bearzi, Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Notification of Planned Change to the Permitted Facility to Support TRUPACT-III Dear Mr. Bearzi: The purpose of this letter is to notify you of planned changes to the permitted facility in accordance with the Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Part 1, General Permit Conditions, Section 1.7.11.1 , Reporting Planned Changes. The changes to the permitted facility are planned to occur during the current maintenance outage, and are described in the enclosed Notification of Planned Change to the Permitted Facility-Waste Isolation Pilot Plant. If you have any questions regarding this notification, please contact George Basabilvazo

334

City and County of Denver - Solar Panel Permitting (Colorado) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Panel Permitting (Colorado) Solar Panel Permitting (Colorado) City and County of Denver - Solar Panel Permitting (Colorado) < Back Eligibility Commercial Construction General Public/Consumer Industrial Low-Income Residential Multi-Family Residential Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Department of Development Services Construction, Electrical, Plumbing and Zoning Permits* are required for Photovoltaic (PV) systems installed in the city of Denver. Denver provides same day permit review for most solar panel projects. More complex engineering projects may still be required to go through the Plan Review process. To obtain Zoning Permits for flush mounted solar panels, applicants must

335

Solar/Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards < Solar Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Solar/Wind Permitting Standards Incentives CSV (rows 1 - 55) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active

336

Solar and Wind Permitting Laws | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permitting Laws Permitting Laws Solar and Wind Permitting Laws < Back Eligibility Commercial Industrial Nonprofit Residential Schools Savings Category Solar Buying & Making Electricity Wind Program Info State New Jersey Program Type Solar/Wind Permitting Standards Provider New Jersey Department of Community Affairs New Jersey has enacted three separate laws addressing local permitting practices for solar and wind energy facilities. The first deals with solar and wind facilities located in industrial-zoned districts; the second with wind energy devices sited on piers; and the third addresses permitting standards small wind energy devices in general. All three are described below. '''Solar and Wind as Permitted Uses in Industrial Zones''' In March 2009 the state enacted legislation (A.B. 2550) defining facilities

337

Section Administration and Resources  

Science Conference Proceedings (OSTI)

Section Information, Membership, Newsletters and Awards Section Administration and Resources Awards Program aocs award Awards baldwin fats global inform job listings member membership network oils ...

338

RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada  

SciTech Connect

This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

,

2013-02-21T23:59:59.000Z

339

RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2011  

SciTech Connect

This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream; a description and quantity of each waste stream in tons and cubic feet received at the facility; the method of treatment, storage, and/or disposal for each waste stream; a description of the waste minimization efforts undertaken; a description of the changes in volume and toxicity of waste actually received; any unusual occurrences; and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

NSTec Environmental Restoration

2012-02-16T23:59:59.000Z

340

Presidential Permits and Export Authorizations - Frequently Asked Questions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permits and Export Permits and Export Authorizations - Frequently Asked Questions Presidential Permits and Export Authorizations - Frequently Asked Questions Presidential Permits Export Authorizations Self Certifications Annual Reports Presidential Permits What are they? Permits for the construction, connection, operation and/or maintenance of electric transmission lines that cross the U.S. international border. What are the criteria? Two primary criteria are used to determine if a proposed project is consistent with the public interest. 1. DOE considers the impact the proposed project would have on the operating reliability of the U.S. electric power supply. 2. DOE must comply with the National Environmental Policy Act of 1969 (NEPA), which requires DOE to consider the environmental consequences

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Request for Information on Permitting of Transmission Lines: Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

342

Presidential Permit Holders - Annual Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permit Holders - Permit Holders - Annual Reports Presidential Permit Holders - Annual Reports Presidential permit holders are responsible for reporting the gross amount electric energy which flows into and out of the United States over the permitted international transmission facility regardless if the energy is wheeled to or for another entity. For example, utility A receives a Presidential permit for a single international transmission line across the U.S.-Canadian border. During the calendar year just completed, 300,000,000 kilowatt-hours (kwh) are imported from Canada across this line. Utility A arranged for the purchase of 200,000,000 kwh for its own use and wheeled 100,000,000 kwh to neighboring utility B. Utility A must report 300,000,000 kwh of imports over the international

343

Environmental assessment for presidential permit applications for Baja  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental assessment for presidential permit applications for Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources. December 2001 PP-234 and PP-235 Enviornmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 More Documents & Publications DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact

344

Expedited Permitting of Grid-Scale Wind Energy Development (Maine) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expedited Permitting of Grid-Scale Wind Energy Development (Maine) Expedited Permitting of Grid-Scale Wind Energy Development (Maine) Expedited Permitting of Grid-Scale Wind Energy Development (Maine) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Wind Buying & Making Electricity Program Info State Maine Program Type Siting and Permitting Maine's Expedited Permitting of Grid-Scale Wind Energy Development statue provides an expedited permitting pathway for proposed wind developments in

345

Geothermal policy development program: expediting the local geothermal permitting process  

DOE Green Energy (OSTI)

For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

Not Available

1981-07-01T23:59:59.000Z

346

Coastal Permit Program Rules (New Jersey) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coastal Permit Program Rules (New Jersey) Coastal Permit Program Rules (New Jersey) Coastal Permit Program Rules (New Jersey) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Siting and Permitting Provider Department of Environmental Protection The Coastal Permit Program Rules provide the processes for permit reviews.

347

DOE Seeking Information on Transmission Line Permitting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

348

Request for Information on Permitting of Transmission Lines: Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

349

Coal Fleet Integrated Gasification Combined Cycle (IGCC Permitting) Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance to owners of planned Integrated Gasification Combined Cycle (IGCC) power plants in order to assist them in permitting these advanced coal power generation facilities. The CoalFleet IGCC Permitting Guidelines summarize U.S. federal requirements for obtaining air, water, and solid waste permits for a generic IGCC facility, as described in the CoalFleet User Design Basis Specification (UDBS). The report presents characteristics of IGCC emissions that must be considered in the p...

2006-03-14T23:59:59.000Z

350

Thermal soaring flight of birds and unmanned aerial vehicles  

E-Print Network (OSTI)

Thermal soaring saves much energy, but flying large distances in this form represents a great challenge for birds, people and Unmanned Aerial Vehicles (UAVs). The solution is to make use of so-called thermals, which are localized, warmer regions in the atmosphere moving upwards with a speed exceeding the descent rate of birds and planes. Saving energy by exploiting the environment more efficiently is an important possibility for autonomous UAVs as well. Successful control strategies have been developed recently for UAVs in simulations and in real applications. This paper first presents an overview of our knowledge of the soaring flight and strategy of birds, followed by a discussion of control strategies that have been developed for soaring UAVs both in simulations and applications on real platforms. To improve the accuracy of simulation of thermal exploitation strategies we propose a method to take into account the effect of turbulence. Finally we propose a new GPS independent control strategy for exploiting...

kos, Zsuzsa; Leven, Severin; Vicsek, Tams; 10.1088/1748-3182/5/4/045003

2010-01-01T23:59:59.000Z

351

Proceedings of the Wind Energy and Birds/Bats Workshop: Understanding and Resolving Bird and Bat Impacts  

DOE Green Energy (OSTI)

Most conservation groups support the development of wind energy in the US as an alternative to fossil and nuclear-fueled power plants to meet growing demand for electrical energy. However, concerns have surfaced over the potential threat to birds, bats, and other wildlife from the construction and operation of wind turbine facilities. Co-sponsored by the American Bird Conservancy (ABC) and the American Wind Energy Association (AWEA), the Wind Energy and Birds/Bats Workshop was convened to examine current research on the impacts of wind energy development on avian and bat species and to discuss the most effective ways to mitigate such impacts. On 18-19 May 2004, 82 representatives from government, non-government organizations, private business, and academia met to (1) review the status of the wind industry and current project development practices, including pre-development risk assessment and post-construction monitoring; (2) learn what is known about direct, indirect (habitat), and cumulative impacts on birds and bats from existing wind projects; about relevant aspects of bat and bird migration ecology; about offshore wind development experience in Europe; and about preventing, minimizing, and mitigating avian and bat impacts; (3) review wind development guidelines developed by the USFWS and the Washington State Department of Fish and Wildlife; and (4) identify topics needing further research and to discuss what can be done to ensure that research is both credible and accessible. These Workshop Proceedings include detailed summaries of the presentations made and the discussions that followed.

Schwartz, Susan Savitt (ed.)

2004-09-01T23:59:59.000Z

352

Chapter 38 Hazardous Waste Permitting Process (Kentucky) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Hazardous Waste Permitting Process (Kentucky) 8 Hazardous Waste Permitting Process (Kentucky) Chapter 38 Hazardous Waste Permitting Process (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Kentucky Program Type Environmental Regulations Provider Department for Environmental Protection This administrative regulation establishes the general provisions for storage, treatment, recycling, or disposal of hazardous waste. It provides information about permits and specific requirements for containers, tanks,

353

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

354

Phase III - Permitting and Initial Development | Open Energy Information  

Open Energy Info (EERE)

III - Permitting and Initial Development III - Permitting and Initial Development Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home GEA Development Phase III: Permitting and Initial Development GEA Development Phases The Geothermal Energy Association's (GEA) Geothermal Reporting Terms and Definitions are a guideline for geothermal developers to use when submitting geothermal resource development information to GEA for public dissemination in its annual US Geothermal Power Production and Development Update. GEA's Geothermal Reporting Terms and Definitions serve to increase the consistency, accuracy, and reliability of industry information presented in the development updates. Phase I - Resource Procurement and Identification Phase II - Resource Exploration and Confirmation Phase III - Permitting and Initial Development

355

Alteration of Terrain Permits (New Hampshire) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alteration of Terrain Permits (New Hampshire) Alteration of Terrain Permits (New Hampshire) Alteration of Terrain Permits (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Hampshire Program Type Siting and Permitting Provider NH Department of Environmental Services Alteration of Terrain Bureau

356

Permitting of Consumptive Uses of Water (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permitting of Consumptive Uses of Water (Florida) Permitting of Consumptive Uses of Water (Florida) Permitting of Consumptive Uses of Water (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection Local water management districts are required to establish programs and

357

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pamela Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin Application from Northern Pass Transmission to...

358

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Robert Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin Application from Northern Pass Transmission to...

359

Air Quality Permits (Prince Edward Island, Canada) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that operate any of the following: - fuel burning equipment (utilities and non-utility boilers), - incinerators, and - industrial sources (e.g., asphalt plants) must get a permit...

360

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company Application from Tucson Electric Power Company to construct, operate and maintain...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 183 - Sep. 20, 2000 Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company: Federal Register Notice Volume 65, No. 183 - Sep. 20, 2000...

362

Application to Amend Presidential Permit OE Docket No. PP-022...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-022-4...

363

Operating Permits and Emission Fees (New Mexico) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information New Mexico Program Type Environmental Regulations Fees The New Mexico Environment Department's Air Quality Bureau processes permit applications for industries that...

364

Application for presidential permit OE Docket No. PP-299 Sea...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc More Documents & Publications SEA-04: DOE Notice of Availability...

365

City of Asheville - Building Permit Fee Waiver | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial...

366

Application for presidential permit OE Docket No. PP-334 Energia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC: Notice of Intent To Prepare an Environmental Impact Statement....

367

Application for presidential permit OE Docket No. PP-334 Energia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2009 Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC - Notice of Intent To Prepare an Environmental Impact Statement:...

368

City of Portland - Streamlined Building Permits for Residential...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon City of Portland - Streamlined Building Permits for Residential Solar Systems (Oregon) This is the approved revision of...

369

City of Tucson - Permit Fee Credit for Solar Energy Systems ...  

Open Energy Info (EERE)

Incentive Program Place Arizona Name City of Tucson - Permit Fee Credit for Solar Energy Systems Incentive Type Green Building Incentive Applicable Sector Commercial,...

370

Application for Presidential Permit OE Docket No. PP-257 Emera...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paper Company, Inc. Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc Energy.gov Careers & Internships Funding Opportunities...

371

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement and Conduct Scoping Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Notice to Intent to Prepare an Environmental Impact Statement and...

372

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scope Change 1 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change 1 Application from Montana Alberta Tie Ltd to construct, operate,...

373

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application from Montana Alberta Tie Ltd to construct, operate, and maintain...

374

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ltd Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric...

375

Application for presidential permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC submitted an application for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des...

376

Coordinating Permit Offices and the Development of Utility-Scale...  

NLE Websites -- All DOE Office Websites (Extended Search)

Permit Offices and the Development of Utility-Scale Geothermal Energy 2013 Geothermal Resources Council Annual Meeting Aaron Levine Katherine R. Young Kermit Witherbee October 1,...

377

EA-0587: Proposed Amendment to Presidential Permit PP-63 and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

87: Proposed Amendment to Presidential Permit PP-63 and Associated Modification to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada EA-0587: Proposed...

378

The Impact of City-level Permitting Processes on Residential...  

NLE Websites -- All DOE Office Websites (Extended Search)

The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities...

379

Clark County- Solar and Wind Building Permit Guides  

Energy.gov (U.S. Department of Energy (DOE))

Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

380

Colorado Construction Air Permit Application | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Colorado Construction Air Permit Application Details Activities (0) Areas (0) Regions (0)...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

City of Lakewood - Solar Permit Fee Rebate (Colorado) | Open...  

Open Energy Info (EERE)

Summary The City of Lakewood is providing rebates on permit fees paid by Lakewood homeowners and business owners who install solar water heating systems and photovoltaic (PV)...

382

Application for Presidential Permit OE Docket No. PP-059 Central...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

059 Central Power and Light Company (CPL) Application for Presidential Permit OE Docket No. PP-059 Central Power and Light Company (CPL) Application from Central Power and Light...

383

Amended Application for Presidential Permit OE Docket No: PP...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC: Federal Register Notice, Volume 78, No. 160 - August 19, 2013 Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC: Federal Register...

384

Request for Information on Improving Performance of Federal Permitting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and...

385

water + monitoring + Nevada + permitting | OpenEI Community  

Open Energy Info (EERE)

water + monitoring + Nevada + permitting Home Kyoung's picture Submitted by Kyoung(155) Contributor 2 August, 2012 - 18:43 Nevada Meeting 2 - Regulatory Issues water + monitoring...

386

City of Portland - Streamlined Building Permits for Residential...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Residential Savings For Solar Buying & Making Electricity Heating & Cooling Water Heating Program Information Oregon Program Type SolarWind Permitting Standards The...

387

Water Rights Permit Package Application | Open Energy Information  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon Water Rights Permit Package Application Jump to: navigation, search GEOTHERMAL...

388

Frederick County (Maryland) Department of Permits and Inspections (FCDPI)  

Energy.gov (U.S. Department of Energy (DOE))

The Frederick County (Maryland) Department of Permits and Inspections (FCDPI) is currently reviewing two proposed amendments to the 2012 International Energy Conservation Code (IECC), copies of...

389

Application for presidential permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Federal Register Notice...

390

Application for presidential permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No....

391

Application for presidential permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 Application for presidential permit OE Docket No. PP-362...

392

Local Option - Building Permit Fee Waivers for Renewable Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

permit fees. Class I renewable energy projects include energy derived from solar power, wind power, fuel cells (using renewable or non-renewable fuels), methane gas from...

393

Application for Presidential Permit OE Docket No. PP-044 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 Northern Electric Cooperative Association Application for Presidential Permit OE Docket No. PP-044 Northern Electric Cooperative Association Application from Northern Electric...

394

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application from Soule Hydro to construct, operate...

395

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Peggy Wilson Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson Application from Soule Hydro to...

396

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application from Soule Hydro to...

397

Application for Presidential Permit OE Docket No. PP-369 British...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission...

398

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and...

399

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydro, LLC Application for Presidential Permit OE Docket No. PP-387 Soule Hydro, LLC Application from Soule Hydro to construct, operate and maintain electric transmission...

400

Texas Construction General Permit (TXR1500000) | Open Energy...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Texas Construction General Permit (TXR1500000) edit Details Activities (0) Areas (0)...

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Wind Energy Permitting Standards (North Carolina) | Open Energy...  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon Wind Energy Permitting Standards (North Carolina) No revision has been approved for this...

402

New England Wind Forum: Environmental Impacts? Interaction with Birds,  

Wind Powering America (EERE)

Environmental Impacts? Environmental Impacts? The construction and operation of a wind farm will have some local impact to the natural environment, but the specific impacts are site specific. Effects can include avian (bird), bat, and other wildlife activity. Some of the following documents are available as Adobe Acrobat PDFs. Download Adobe Reader. Birds Largely because of the unique circumstances and experiences surrounding one region in Northern California with significant wind energy development in the 1980s, wind power proponents now conduct wildlife (and particularly avian) studies as a regular part of screening sites for development. Earlier generations of wind turbines were smaller and located close together. They were mounted on lattice towers and had rapidly spinning blades. These wind turbines were located in great numbers in the Altamont Pass, an area of rolling grassland home to a substantial population of raptors. A high number of bird kills resulted. Wind technology has advanced substantially since the 1980s. Today's larger turbines have wider spacing, more slowly spinning blades, and are mounted on tubular towers. Nonetheless, wind turbines, like all manmade structures, do have the potential to impact birds and/or bats. Careful selection of development sites avoids placement in particularly sensitive locations, and for well-sited wind projects, avian impacts can be minimal including relative to other sources of avian collision. The National Wind Coordinating Collaborative published a report discussing bird interaction with wind turbines in the Spring of 2010, "Wind Turbine Interactions with Birds, Bats, and their Habitats: A Summary of Research Results and Priority Questions (PDF 2.0 MB)."

403

Consent Order of Dismissal, Section III  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SRR-ESH-2013-00054 Revision 1 August 28, 2013 Page 1 of 6 Consent Order of Dismissal, Section III.7 Z-Area Saltstone Disposal Facility Permit General Condition B.5.a-h Information Permit Condition Requirement Estimated Value Updated Value Comments B.5 a) Cumulative process volume of salt waste disposed to date Not Applicable 7,845 kgals Vault 4, Cells B, D, E, F, H, J, K, L SDU 2, Cells 2A and 2B b) Process volume of saltstone grout disposed and vault/disposal unit location (including cell identity) for the reporting period Not Applicable 3.0 x 10 2 kgals SDU 2, Cell 2A 2.6 x 10 2 kgals SDU 2, Cell 2B c) Cumulative process volume of saltstone grout disposed to date Not Applicable 1.4 x 10 4 kgals Vault 4, Cells B, D, E, F, H, J, K, L

404

European Section Articles of interest.  

Science Conference Proceedings (OSTI)

European geographical region. European Section Articles of interest. Sections award awards canadian division fats member membership network oils section European Section aocs awards European Section European Section Awards for Young Lipid Scienti

405

GRR/Section 4 - Exploration Overview | Open Energy Information  

Open Energy Info (EERE)

4 - Exploration Overview 4 - Exploration Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4 - Exploration Overview 04ExplorationPermittingOverview (3).pdf Click to View Fullscreen Contact Agencies BLM United States Forest Service Regulations & Policies 30 USC § 1001 Triggers None specified Click "Edit With Form" above to add content 04ExplorationPermittingOverview (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The exploration process requires consideration of right of way access, geothermal leasing, and state and federal exploration permits. 4.1 and 4.2 - Will the Developer Engage in Coproduction on an Existing

406

OSSF PERMIT APPLI NO 033 0224  

NLE Websites -- All DOE Office Websites (Extended Search)

;1 ;1 r.:===--~"""""""",,~ ~ RECEIVED By Department of energy Nationai Nuciear Securiiy Administration Pantax Sit; Office P. O. Bo:! 30030 Amariiio, TX 79; 20 M.Au~ 2 8 2007 ~v1Er-v10RA1'-IDL~v1 FOR: J. l:t.laa'1 Jones, Legal, B\VXT P3.t'1tex LLC FROM: SUBJECT: Pa..ntex Plant - RNI002i0756 Authorization to Construct a.11 On-Site Sewage Facility Located at Section 51, Block 11-4, J.H. Gibson Su.Plley Carson County, Texas OSSF Pennit Application Num.bei 033-0224 Please reference the attached letter from the Texas Commission on Environmental Quality (TCEQ) Region i office, dated january 4, 2007, subject as above. Referenced letter authorizes the construction of an On-Site Sewage ~'acility (OS SF) at tlte office

407

Joint Implementation, Clean Develop-ment Mechanism and Tradable Permits  

E-Print Network (OSTI)

Joint Implementation, Clean Develop- ment Mechanism and Tradable Permits International Regulation) funded project `C02 permits in Danish and European energy policy'. .. Rise-R- 1197(EN) #12;WORKING PAPER the institutionalji-amework forJI it is important to know the incentives and motivations of the dlj$erent groups

408

Waste Feed Delivery Environmental Permits and Approvals Plan  

Science Conference Proceedings (OSTI)

This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

TOLLEFSON, K.S.

2000-01-18T23:59:59.000Z

409

Division and Section Awards  

Science Conference Proceedings (OSTI)

Division and Section Awards Division and Section Awards Divisions achievement agricultural analytical application award awards biotechnology detergents distinguished division Divisions edible fats food Interest Area lipid lipids member membership

410

Sections / Geographical Regions Information  

Science Conference Proceedings (OSTI)

AOCS Sections provide a local forum for fats and oils professionals. Building a Stronger Global Association Sections / Geographical Regions Information Divisions achievement agricultural analytical application award awards biotechnology detergents

411

Unlocking the Nanoscale Secrets of Bird-Feather Colors | Advanced Photon  

NLE Websites -- All DOE Office Websites (Extended Search)

An Unlikely Route to Ferroelectricity An Unlikely Route to Ferroelectricity How to Make a Splash Pressure-Tuning the Quantum Phase Transition in a Model 2-D Magnet Reappearing Superconductivity Surprises Scientists Manipulating Genes with Hidden TALENs Science Highlights Archives: 2013 | 2012 | 2011 | 2010 2009 | 2008 | 2007 | 2006 2005 | 2004 | 2003 | 2002 2001 | 2000 | 1998 | Subscribe to APS Science Highlights rss feed Unlocking the Nanoscale Secrets of Bird-Feather Colors MAY 18, 2012 Bookmark and Share This collage shows the ring-shaped, isotropic x-ray diffraction pattern and electron microscope cross-section of the three-dimensional amorphous or quasi-ordered biophotonic nanostructure in spongy medullary feather barbs responsible for the vivid turquoise plumage of the Plum-throated Cotinga

412

DOE Environmental Assessment EA-1391 for Presidential Permit Applications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Environmental Assessment EA-1391 for Presidential Permit DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact The Department of Energy has determined in its Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 a finding of no significant impact Finding of No Significant Impact: DOE Enviornmental Assessment EA-1391 More Documents & Publications Environmental assessment for presidential permit applications for Baja

413

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

414

City of Asheville - Building Permit Fee Waiver | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 7/01/2009 State North Carolina Program Type Green Building Incentive Provider Building Safety Department The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings. Waivers for building permit fees may apply to residences with the following designations (the regular fee is in parentheses): * HealthyBuilt Home Certification* ($100) * Energy Star Rating ($100) * Geothermal heat pumps ($50)

415

City of Portland - Streamlined Building Permits for Residential Solar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Oregon Program Type Green Building Incentive Provider City of Portland The City of Portland's Bureau of Development Services (BDS) developed an electronic permitting process for residential solar energy system installations. With this streamlined, expedited process, solar contractors can submit the project plans and permit application online for residential installations. In order to file the online application, the contractor must first be trained. The City of Portland has staff at the permitting desk trained as solar experts to assist solar contractors who need help filing their permits in person. This process has a turnaround time of approximately 2-3 business days for building permits.

416

State Water Permit Regulation (Arkansas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permit Regulation (Arkansas) Permit Regulation (Arkansas) State Water Permit Regulation (Arkansas) < Back Eligibility Fuel Distributor Industrial Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality It is the purpose of this regulation to adopt standards applicable to the storage, discharge, or disposal of any waste which, if unregulated, will cause pollution of waters of the state or result in wastes being placed in a location where it is likely to cause pollution of the waters of the state. These standards are intended to protect public health and the environment, and prevent, control, or abate pollution. The State Water Permit Regulation is implemented to adopt standards applicable to the storage, discharge, or disposal of any waste that, if

417

Environment/Health/Safety (EHS): Operating Permits for LBNL Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Permits for LBNL Activities Operating Permits for LBNL Activities LBNL Main Site Agency Expiration Date Certified Unified Program Agency Permit and Registration Hazardous Materials Release Response Plan (Hazardous Materials Business Plan) Aboveground Petroleum Storage Tanks, Spill Prevention Control and Countermeasures Plan Underground Storage Tank Program Hazardous Waste Generator Program Tiered Permit Program for Onsite Treatment of Hazardous Wastes City of Berkeley March 1, 2014 Fuel Dispensing Sources at Building 76: E85 Unleaded Bay Area Air Quality Management District July 1, 2014 Stationary Air Emission Sources (28 permits): Diesel-powered Emergency Standby Generators: Buildings 2, 31, 37(2), 48, 50A, 50B, 55, 62, 64(2), 66, 67, 68, 70, 70A, 72, 74, 77, 84B, 85 and three (3) portable units

418

Exclusionary Manipulation of Carbon Permit Markets: A Laboratory Test  

E-Print Network (OSTI)

The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm here a monopolist increases its holding of permits in order to raise its rivals costs and thereby gain more on a product market. Earlier studies have claimed that this type of market manipulation is likely to substantially reduce the social gains of permit trading and even result in negative gains. The experiment designed here parallels institutional and informational conditions likely to hold in real trade with carbon permits among electricity producers. Although the dominant firm withheld supply from the electricity market, the outcome seems to reject the theory of exclusionary manipulation. In later trading periods, closing prices on both markets, permit holdings and total electricity production are near competitive levels. Social gains of emissions trading are higher than in earlier studies. Key words: emissions trading; market power; experiments

Bjrn Carln

2002-01-01T23:59:59.000Z

419

Turbine Nozzles Failure Due to Bird Strike - Programmaster.org  

Science Conference Proceedings (OSTI)

Presentation Title, Turbine Nozzles Failure Due to Bird Strike ... crystal (SX) nickel-based superalloy with environmental coatings on the flow path ... was caused by clogged cooling holes and film cooling reduction, resulting in ... Analysis of Crack Development Involving a Pressure Vessel in a Synthetic Gas Production Plant.

420

CALIFORNIA GUIDELINES FOR REDUCING IMPACTS TO BIRDS AND BATS FROM  

E-Print Network (OSTI)

Treaty Act, rotorswept area, wind energy, wind siting guidelines, wind turbines. #12; #12; i development projects and wind turbine repowering projects in California. The objectives of the Guidelines of Wind Energy Research Bird and bat interactions with wind turbines is an area of active research

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Extrapair paternity, migration, and breeding synchrony in birds  

E-Print Network (OSTI)

standardized linear contrasts to show that this positive relationship persists when all bird species for which distribution maps published in standard ornithological handbooks (e.g., Cramp, 1977­1994; Marchant and Higgins standardized, may be entered into conventional statistical analyses. Standardization of contrasts is dependent

Cambridge, University of

422

The Influence of Woodlot Size and Location in Suburban and Rural Matrices on Bird Species Richness and Individual Abundance.  

E-Print Network (OSTI)

??This study assessed the influence of woodlot area and matrix composition on bird species richness and individual abundance. Bird surveys were conducted in winter 2004 (more)

Chartier, Neil Allen

2006-01-01T23:59:59.000Z

423

Inspection of Forrestal parking permit allocation and assignments  

Science Conference Proceedings (OSTI)

The purpose of this inspection was to review the process cr allocating and assigning parking permits at the Forrestal building. Specifically, we sought to determine the roles and responsibilities of Department of Energy (DOE) officials involved in the administration of the Forrestal parking permit process during the period June 1, 1991 to February 1, 1992. We also sought to determine if the allocation and assignment of Forrestal building parking spaces was implemented in accordance with Federal and DOE requirements. For our review, we interviewed the Headquarters officials involved in the administration of the parking permit allocation and assignment process. We also reviewed parking permit files and associated documentation for the period June 1, 1991 through February 1, 1992. In addition, we conducted a limited sampling of parking permits that were revoked during July and August 1991 to assess if they were processed in compliance with applicable regulations. We found no evidence that the actions by the Special Assistant to the Secretary (White House Liaison) and the other members of the parking committee regarding the issuance and revocation of parking permits were for any reason other than a desire to ensure that only individuals having a legitimate basis for a parking permit were issued a permit. However, we found that decisions by the parking committee regarding revocation of permits and appeals of revocation decisions were not always documented, nor were there written guidelines or procedures to govern the activities of the committee. In our view, the lack of written guidelines and procedures resulted in the use of invalidated personal knowledge by the parking committee in making decisions involving the revocation of parking permits and led to inconsistencies in the notification of individuals about the associated appeal process.

Not Available

1992-12-16T23:59:59.000Z

424

Apparatus and methods for installing, removing and adjusting an inner turbine shell section relative to an outer turbine shell section  

DOE Patents (OSTI)

A turbine includes upper and lower inner shell sections mounting the nozzles and shrouds and which inner shell is supported by pins secured to a surrounding outer shell. To disassemble the turbine for access to the inner shell sections and rotor, an alignment fixture is secured to the lower outer shell section and has pins engaging the inner shell section. To disassemble the turbine, the inner shell weight is transferred to the lower outer shell section via the alignment fixture and cradle pins. Roller assemblies are inserted through access openings vacated by support pins to permit rotation of the lower inner shell section out of and into the lower outer shell section during disassembly and assembly. The alignment fixture includes adjusting rods for adjusting the inner shell axially, vertically, laterally and about a lateral axis. A roller over-cage is provided to rotate the inner shell and a dummy shell to facilitate assembly and disassembly in the field.

Leach, David (Niskayuna, NY); Bergendahl, Peter Allen (Scotia, NY); Waldo, Stuart Forrest (Salem, NC); Smith, Robert Leroy (Milford, OH); Phelps, Robert Kim (Milford, OH)

2001-01-01T23:59:59.000Z

425

IMPACTS TO BIRDS CAUSED BY WIND ENERGY GENERATION 4.1 INTRODUCTION  

E-Print Network (OSTI)

77 CHAPTER 4 IMPACTS TO BIRDS CAUSED BY WIND ENERGY GENERATION 4.1 INTRODUCTION Bird mortality studies reporting on wind energy facilities elsewhere regularly report that bird mortality in the APWRA is unusually high there and is, therefore, an anomaly among wind energy facilities in the United States. We

426

Wetlands Standard Dredge and Fill Permit (New Hampshire) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standard Dredge and Fill Permit (New Hampshire) Standard Dredge and Fill Permit (New Hampshire) Wetlands Standard Dredge and Fill Permit (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Hampshire Program Type Environmental Regulations Provider Department of Environmental Services

427

City of Santa Monica - Expedited Permitting for Green Buildings |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expedited Permitting for Green Buildings Expedited Permitting for Green Buildings City of Santa Monica - Expedited Permitting for Green Buildings < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Water Heating Wind Program Info State California Program Type Green Building Incentive Provider City of Santa Monica The City of Santa Monica allows for priority plan check processing for building projects that are registered with the United States Green Building Council for certification under the Leadership in Energy and Environmental Design (LEED) Green Building Rating System. The priority status applies to

428

The Effect of Congress' Mandate to Create Greater Efficiencies in the Characterization of Transuranic Waste through the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit  

Science Conference Proceedings (OSTI)

Effective December 1, 2003, the U.S. Congress directed the Department of Energy (DOE) to file a permit modification request with the New Mexico Environment Department (NMED) to amend the Hazardous Waste Facility Permit (hereinafter 'the Permit') at the Waste Isolation Pilot Plant (WIPP). This legislation, Section 311 of the 2004 Energy and Water Development Appropriations Act, was designed to increase efficiencies in Transuranic (TRU) waste characterization processes by focusing on only those activities necessary to characterize waste streams, while continuing to protect human health and the environment. Congressionally prescribed changes would impact DOE generator site waste characterization programs and waste disposal operations at WIPP. With this legislative impetus, in early 2004 the DOE and Washington TRU Solutions (WTS), co-permittee under the Permit, submitted a permit modification request to the NMED pursuant to Section 311. After a lengthy process, including extensive public and other stakeholder input, the NMED granted the Permittees' request in October 2006, as part of a modification authorizing disposal of Remote-Handled (RH) TRU waste at WIPP. In conclusion: Implementation of the Permit under the revised Section 311 provisions is still in its early stages. Data are limited, as noted above. In view of these limited data and fluctuations in waste feed due to varying factors, at the current time it is difficult to determine with accuracy the impacts of Section 311 on the costs of characterizing TRU waste. It is safe to say, however, that the there have been many positive impacts flowing from Section 311. The generator sites now have more flexibility in characterizing waste. Also, RH TRU waste is now being disposed at WIPP - which was not possible before the 2006 Permit modification. As previously noted, the RH modification was approved at the same time as the Section 311 modification. Had the Section 311 changes not been implemented, RH TRU waste may not have been successfully permitted for disposal at WIPP. Changes made pursuant to Section 311 helped to facilitate approval of the proposed RH TRU modifications. For example, the three scenarios for use in AK Sufficiency Determination Requests, described herein, are essential to securing approval of some RH TRU waste streams for eventual disposal at WIPP. Thus, even if characterization rates do not increase significantly, options for disposal of RH TRU waste, which may not have been possible without Section 311, are now available and the TRU waste disposal mission is being accomplished as mandated by Congress in the LWA. Also, with the Section 311 modification, the Permittees commenced room-based VOC monitoring in the WIPP repository, which is also a positive impact of Section 311. Permit changes pursuant to Section 311 were a good beginning, but much more is need to encourage more efficient methodologies in waste characterization activities for TRU mixed waste destined for WIPP. Although the Permittees now have more flexibility in characterizing waste for disposal at WIPP, the processes are still lengthy, cumbersome, and paper-intensive. As the generator sites continue to characterize waste under Section 311, more data will likely be compiled and evaluated to assess the longer term cost and technical impacts of Section 311. Also, further refinements in TRU waste characterization requirements through Permit modifications are likely in future years to eliminate, improve, and clarify remaining unnecessary and redundant Permit provisions. Continuous improvements to the TRU waste characterization program are bound to occur, resulting in even greater efficiencies in the characterization and ultimate disposal of TRU waste. (authors)

Johnson, G.J. [Washington TRU Solutions, LLC, Waste Isolation Pilot Plant, Carlsbad, New Mexico (United States); Kehrman, R.F. [Washington Regulatory and Environmental Services, Waste Isolation Pilot Plant, Carlsbad, New Mexico (United States)

2008-07-01T23:59:59.000Z

429

Special Section on RFID  

E-Print Network (OSTI)

The eight articles in this special section describe state-of-the-art technologies and tools and one application of RFID.

Engels, Daniel W.

430

Section J: HOUSEHOLD CHARACTERISTICS  

U.S. Energy Information Administration (EIA)

2001 Residential Energy Consumption Survey Form EIA-457A (2001)--Household Questionnaire OMB No.: 1905-0092, Expiring February 29, 2004 42 Section J: HOUSEHOLD ...

431

Section D: SPACE HEATING  

U.S. Energy Information Administration (EIA)

2005 Residential Energy Consumption Survey Form EIA-457A (2005)--Household Questionnaire OMB No.: 1905-0092, Expiring May 31, 2008 33 Section D: SPACE HEATING

432

DOE and FWS Sign New MOU on Migratory Bird Protection | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE and FWS Sign New MOU on Migratory Bird Protection DOE and FWS Sign New MOU on Migratory Bird Protection DOE and FWS Sign New MOU on Migratory Bird Protection December 4, 2013 - 7:00am Addthis DOE and FWS Sign New MOU on Migratory Bird Protection DOE and the U.S. Fish and Wildlife Service (FWS) recently signed a Memorandum of Understanding (MOU) that will enhance collaboration in promoting the conservation of migratory birds. DOE manages land that includes wetlands, shrub-steppe, shortgrass prairie, desert, and forested areas that provide habitat for migratory birds. In the MOU, DOE recognizes that some of its activities have the potential to affect migratory birds (e.g., transmission lines, power poles, invasive weed control, and various construction activities), and agrees that it is important to conserve

433

EIS-0414: Presidential Permit Application, Energia Sierra Juarez  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14: Presidential Permit Application, Energia Sierra Juarez 14: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California EIS-0414: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California Summary This EIS evaluates the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS. Public Comment Opportunities No public comment opportunities available at this time.

434

Solar Construction Permitting Standards (California) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards (California) Standards (California) Solar Construction Permitting Standards (California) < Back Eligibility Commercial Industrial Local Government Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Solar/Wind Permitting Standards Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base the fee for a solar permit on the value of the solar system or the value of the property on which the system will be installed. It also requires the local government to separately identify every fee charged on the invoice provided to the

435

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

436

City of Riverhead - Energy Conservation Device Permitting Fees | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 07/01/2005 (retroactive) State New York Program Type Green Building Incentive Provider Building Department In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on residential or commercial buildings. The provision in the town code applies to any energy conservation device "installed in or on a structure which qualifies for any federal, state or local tax exemption, tax credit or tax rebate", but

437

Taxes, Permits, and the Adoption of Abatement Technology under Imperfect  

Open Energy Info (EERE)

Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance Jump to: navigation, search Name Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance Agency/Company /Organization Resources for the Future Sector Energy Topics Market analysis, Technology characterizations Resource Type Publications Website http://www.rff.org/RFF/Documen References Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance[1] Abstract "This paper analyzes the effects of the choice between price-based and quantity-based emissions regulations on compliance incentives and social welfare in the presence of incomplete enforcement and technology adoption. We show that if the regulator does not adjust the level of the policies in

438

Policy for Permitting Low-Emitting Sources (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy for Permitting Low-Emitting Sources (West Virginia) Policy for Permitting Low-Emitting Sources (West Virginia) Policy for Permitting Low-Emitting Sources (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Siting and Permitting While this policy alleviates some requirements on low-emitting emission sources, it does not change the policy of requiring applicants to submit reasonable information concerning all potential emission sources.

439

Disclosure of Permitted Communication Concerning Fossil Fuel Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Disclosure of Permitted Communication Concerning Fossil Fuel Energy Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 This memo provides an overview of communications made to DOE staff on the subject of the rulemaking referenced above. The communications occurred at a meeting held on February 13, 2013. DOE 433 ex parte memo.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No. EERE-2011-BT-CE-0077

440

DOE to Hold Public Information Meetings on Requested Permit Modifications  

NLE Websites -- All DOE Office Websites (Extended Search)

Requested Permit Modifications Requested Permit Modifications CARLSBAD, N.M., March 15, 2001 -- The public is invited to comment on requested modifications to the Hazardous Waste Facility Permit for the Waste Isolation Pilot Plant (WIPP). Submittal of the proposed modification request to the New Mexico Environment Department (NMED) by the U.S. Department of Energy (DOE) begins a formal review process that includes a 60-day public comment period and public information meetings. In its submittal, DOE requests five permit changes to modify conditions at the facility. The proposed modifications conform to industry standards for the handling of hazardous materials and would continue to protect the safety of the facility, its employees, and the public. The first two requested changes would eliminate redundant and obsolete training

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Comments on RFI on Permitting of Transmission Lines Available | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available April 3, 2012 - 2:12pm Addthis On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The Request for Information focused on making the development times for generation and transmission more commensurate with one another. Public comments received from the following organizations are now available for review and downloading. - Allegheny Highlands Alliance - American Electric Power

442

EIS-0463: Presidential Permit Application for Northern Pass Transmission,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Presidential Permit Application for Northern Pass 3: Presidential Permit Application for Northern Pass Transmission, New Hampshire EIS-0463: Presidential Permit Application for Northern Pass Transmission, New Hampshire Summary This EIS will evaluate the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. The U.S. Forest Service, White Mountain National Forest, and the U.S. Army Corps of Engineers, New England District, are cooperating agencies in the preparation of this EIS. Public Comment Opportunities None available at this time. Documents Available for Download September 18, 2013 EIS-0463: Notice of Public Meeting Location Change

443

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |  

NLE Websites -- All DOE Office Websites (Extended Search)

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity, consistency, and transparency by describing each entity's role and responsibilities when project applicants wish to build electric transmission facilities. Additionally, the MOU designates a "Lead Agency" serving as the single point-of-contact for coordinating all federal environmental reviews

444

Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Siting and Permitting Michigan implements the federal requirements of the Clean Air Interstate Rule (CAIR) through state regulations. Michigan's Rule 821 requires subject sources to obtain and operate in compliance with a CAIR Annual NOx Budget

445

Microsoft Word - Permit Change 10-23-08  

NLE Websites -- All DOE Office Websites (Extended Search)

New Mexico Environment Department Approves Permit Change for WIPP CARLSBAD, N.M., October 23, 2008 - The New Mexico Environment Department (NMED) today approved a permit change to the U. S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP), which demonstrates that 15 WIPP site locations have been compliant with environmental protection requirements. The permit change eliminates continued sampling and analysis at these locations. Sampling data, collected by DOE over a 10-year period from the 15 locations, indicated that the areas posed no risk to human health or the environment. Last year, DOE submitted a Class 3 permit modification request to NMED to discontinue sampling of the areas, which included a number of mud pits constructed for exploratory boreholes, an evaporation pond and

446

U-093: Mozilla Firefox Multiple Flaws Permit Remote Code Execution,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, 3: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, Information Disclosure, and Cross-Site Scripting Attacks U-093: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, Information Disclosure, and Cross-Site Scripting Attacks February 1, 2012 - 5:51am Addthis PROBLEM: Multiple vulnerabilities were reported in Mozilla Firefox. PLATFORM: Linux (Any), UNIX (Any), Windows (Any) Version(s): prior to 3.2.26; prior to 10.0 ABSTRACT: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, Information Disclosure, and Cross-Site Scripting. reference LINKS: SecurityTracker Alert ID: 1026605 CVE-2011-3659, CVE-2012-0442 CVE-2012-0443, CVE-2012-0444 CVE-2012-0445, CVE-2012-0446 CVE-2012-0447, CVE-2012-0449 CVE-2012-0450 Vendor Site IMPACT ASSESSMENT:

447

Regulations of the Arkansas Operating Air Permit Program (Arkansas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) < Back Eligibility Commercial Construction Fuel Distributor Industrial Investor-Owned Utility Retail Supplier Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality The Regulations of the Arkansas Air Operating Program are adopted in accordance with the provisions of Part UU of the Arkansas Water and Air Pollution Control Act, Arkansas Code Annotated 8-4-101, and will be referred to in this description as "program", "regulations" and "regulation No. 26". The regulations are intended to meet the requirements of title of

448

City of San Diego - Sustainable Building Expedited Permit Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego - Sustainable Building Expedited Permit Program San Diego - Sustainable Building Expedited Permit Program City of San Diego - Sustainable Building Expedited Permit Program < Back Eligibility Commercial Industrial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Solar Buying & Making Electricity Program Info Start Date 05/20/2003 State California Program Type Green Building Incentive Provider City of San Diego In 2002, the City of San Diego passed a Resolution R-298001, which amended the [http://dsireusa.org/incentives/incentive.cfm?Incentive_Code=CA42R&re=1&ee=1 Sustainable Building Policy] to allow for expedited permitting for sustainable buildings. Sustainable buildings are defined in Policy Number

449

Impact of Stochastic Physics in a Convection-Permitting Ensemble  

Science Conference Proceedings (OSTI)

A stochastic physics scheme is tested in the Application of Research to Operations at Mesoscale (AROME) short-range convection-permitting ensemble prediction system. It is an adaptation of ECMWFs stochastic perturbation of physics tendencies (...

Franois Bouttier; Benot Vi; Olivier Nuissier; Laure Raynaud

2012-11-01T23:59:59.000Z

450

City of Riverhead- Energy Conservation Device Permitting Fees  

Energy.gov (U.S. Department of Energy (DOE))

In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on...

451

Closed BLM Public Lands: Geothermal Leases Not Permitted The...  

Open Energy Info (EERE)

Closed BLM Public Lands: Geothermal Leases Not Permitted The U.S. Bureau of Land Management (BLM) released a series of GIS layers of public lands closed to geothermal leases...

452

City of Philadelphia- Streamlined Solar Permitting and Fee Reduction  

Energy.gov (U.S. Department of Energy (DOE))

Photovoltaic systems of 10 kW or less installed on 1- or 2-family residential units are eligible for streamlined permitting and a fee reduction. PV projects can use a [http://www.phila.gov/green...

453

Application for presidential permit OE Docket No. PP-334 Baja...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34 Baja Wind U.S Transmission LLC: Update Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Update Application from Baja Wind U.S...

454

Broward County Online Solar Permitting (Florida) | Open Energy...  

Open Energy Info (EERE)

flat fee. Applicants can use this system to choose from pre-approved and pre-engineered solar panel mounting installation designs, and then apply for permits using those designs....

455

City of Riverhead - Energy Conservation Device Permitting Fees...  

Open Energy Info (EERE)

not eligible for the Fast-Track process. Prior to the code revision permitting fees for solar panel installations often approached 1,000. Incentive Contact Contact Name Sharon...

456

City of Aurora - Solar Permit Offset and Energy Audit Rebate...  

Open Energy Info (EERE)

added to DSIRE 2010-05-03 Last DSIRE Review 04172012 References DSIRE1 Summary All solar electric system installations in the city of Aurora require a building permit. With...

457

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70, No. 210 - Nov. 1, 2005 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005...

458

State Waste Discharge Permit application: 400 Area Septic System  

Science Conference Proceedings (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affects groundwater or has the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 400 Area Septic System. The influent to the system is domestic waste water. Although the 400 Area Septic System is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. Therefore, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used.

Not Available

1994-06-01T23:59:59.000Z

459

APPLICATION FOR NUCLEAR SUBSTANCE USER PERMIT 1. a) Principal Investigator: ________________________  

E-Print Network (OSTI)

APPLICATION FOR NUCLEAR SUBSTANCE USER PERMIT 1. a) Principal Investigator-Mail: ____________________________________ 2. Previous experience in nuclear substance work by applicant: ________________________________________________________________________ 3. List all rooms where nuclear substances will be used or stored

Beaumont, Christopher

460

West Coast Aerial Sardine Survey Application for Exempted Fishing Permit  

E-Print Network (OSTI)

West Coast Aerial Sardine Survey 2010 Application for Exempted Fishing Permit Applicants ........................................................................................5 A. Coastwide Summer Aerial Sardine Survey (July-August, 2010) ....................6 I. Survey Design ­ Coastwide Summer Aerial Sardine Survey ...............................6 Stage 1: Aerial Transect

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Permit by Rule for Small Renewable Energy Projects (Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permit by Rule for Small Renewable Energy Projects (Virginia) Permit by Rule for Small Renewable Energy Projects (Virginia) Permit by Rule for Small Renewable Energy Projects (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Virginia Department of Environmental Quality In 2009, the Virginia General Assembly enacted legislation directing the Virginia Department of Environmental Quality to develop regulations for the construction and operation of renewable energy projects of 100 megawatts

462

South Dakota alcohol fuel production handbook: permits, regulations, and assistance  

SciTech Connect

This handbook contains information on South Dakota alcohol legislation, and information on the various types of additional government program assistance available to the alcohol producer. It was prepared to assist potential alcohol producers with federal and state permit prerequisites. (DMC)

1980-01-01T23:59:59.000Z

463

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority...

464

OpenEI Community - Section 7  

Open Energy Info (EERE)

/0 en Idaho Meeting #2 /0 en Idaho Meeting #2 http://en.openei.org/community/blog/idaho-meeting-2 The second Idaho GRR meeting was held today in Boise.  Though the intent of the meeting was to focus on identifying permitting concerns, agencies and developers alike had few concerns with the current process.  There were agency personnel in attendance who had not attended the first Idaho meeting, so the workshop was a great opportunity to work through the flowcharts relevant to those agencies.read more http://en.openei.org/community/blog/idaho-meeting-2#comments endangered species Fauna Fish and Wildlife Flora FWS Section 12 Section 7 Geothermal

465

Emissions Trading with Profit-Neutral Permit Allocations  

E-Print Network (OSTI)

Emissions Trading with Profit-Neutral Permit Allocations Cameron J. Hepburn, John K.-H. Quah, and Robert A. Ritz August 2012 CWPE 1235 EMISSIONS TRADING WITH PROFIT-NEUTRAL PERMIT ALLOCATIONS Cameron J... or technologies. However, there is a significant disadvantage to the use of taxes or trading: inframarginal wealth 1 The authors are affiliated to, respectively, the Grantham Research Institute, London School of Economics and Political Science (c.j...

Hepburn, Cameron J.; Quah, John K.-H.; Ritz, Robert A.

2012-08-17T23:59:59.000Z

466

White Bird, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bird, Idaho: Energy Resources Bird, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 45.7615508°, -116.3006974° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.7615508,"lon":-116.3006974,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

467

A Review on Fish Swimming and Bird/Insect Flight  

E-Print Network (OSTI)

This expository review is devoted to fish swimming and bird/insect flight. (i) The simple waving motion of an elongated flexible ribbon plate of constant width, immersed in a fluid at rest, propagating a wave distally down the plate to swim forward is first considered to provide a fundamental concept on energy conservation. It is generalized to include variations in body width and thickness, vortex shedding from appended dorsal, ventral and caudal fins to closely simulate fish swimming for which a nonlinear theory is presented for large-amplitude propulsion. (ii) For bird flight, the pioneering studies on oscillating rigid wings are briefed, followed by presenting a nonlinear unsteady theory for flexible wing with arbitrary variations in shape and trajectory with a comparative study with experiments. (iii) For insect flight, more recent advances are reviewed under aerodynamic theory and modeling, computational methods, and experiments, on forward and hovering flights with producing leading-edge vortex to give...

Wu, Theodore Yaotsu

2010-01-01T23:59:59.000Z

468

Sectional device handling tool  

DOE Patents (OSTI)

Apparatus for remotely handling a device in an irradiated underwater environment includes a plurality of tubular sections interconnected end-to-end to form a handling structure, the bottom section being adapted for connection to the device. A support section is connected to the top tubular section and is adapted to be suspended from an overhead crane. Each section is flanged at its opposite ends. Axially retractable bolts in each bottom flange are threadedly engageable with holes in the top flange of an adjacent section, each bolt being biased to its retracted position and retained in place on the bottom flange. Guide pins on each top flange cooperate with mating holes on adjacent bottom flanges to guide movement of the parts to the proper interconnection orientation. Each section carries two hydraulic line segments provided with quick-connect/disconnect fittings at their opposite ends for connection to the segments of adjacent tubular sections upon interconnection thereof to form control lines which are connectable to the device and to an associated control console.

Candee, Clark B. (Monroeville, PA)

1988-07-12T23:59:59.000Z

469

Section Building Training Manual  

E-Print Network (OSTI)

) to enter search criteria. 3. Enter the term you are searching in. 4. Enter section search criteria (subject Exit #12;6 Adding a Section of a Course 1. Access the Schedule Form (SSASECT). 2. Enter the term code. 14. Tab to the Part of Term field. Enter the Part of Term code (will be 1 for Fall, Spring and Summer

Kelly, Scott David

470

A Review on Fish Swimming and Bird/Insect Flight  

E-Print Network (OSTI)

This expository review is devoted to fish swimming and bird/insect flight. (i) The simple waving motion of an elongated flexible ribbon plate of constant width, immersed in a fluid at rest, propagating a wave distally down the plate to swim forward is first considered to provide a fundamental concept on energy conservation. It is generalized to include variations in body width and thickness, vortex shedding from appended dorsal, ventral and caudal fins to closely simulate fish swimming for which a nonlinear theory is presented for large-amplitude propulsion. (ii) For bird flight, the pioneering studies on oscillating rigid wings are briefed, followed by presenting a nonlinear unsteady theory for flexible wing with arbitrary variations in shape and trajectory with a comparative study with experiments. (iii) For insect flight, more recent advances are reviewed under aerodynamic theory and modeling, computational methods, and experiments, on forward and hovering flights with producing leading-edge vortex to give unsteady high lift. (iv) Prospects are explored on extracting intrinsic flow energy by fish and bird to gain thrust for propulsion. (v) The mechanical and biological principles are drawn together for unified studies on the energetics in deriving metabolic power for animal locomotion, leading to a surprising discovery that the hydrodynamic viscous drag on swimming fish is largely associated with laminar boundary layers, thus drawing valid and sound evidences for a resolution to the fish-swim paradox proclaimed by Gray (1936, 1968).

Theodore Yaotsu Wu

2010-06-09T23:59:59.000Z

471

Title V Semi-Annual Emissions Report for Permit P100R1 July 1, 2011 - December 31, 2011  

SciTech Connect

Reports of actual emissions from permitted sources in Section 2.0 shall be submitted on a 6 month basis. Reports shall not include emissions from insignificant activities. Emission estimates of criteria pollutants NOx, CO, SO2, PM and VOCs shall not include fugitive emissions. Emission estimates of HAPs shall include fugitive emissions. The reports shall include a comparison of actual emissions that occurred during the reporting period with the facility-wide allowable emission limits specified in Section 2.11 of this permit. The report required by Condition 4.1 shall be submitted within 90 days from the end of the reporting period. The semiannual report required by Condition 4.2 shall be submitted within 45 days from the end of the reporting period. The reporting periods are January 1st to June 30th and July 1st to December 31st. This condition is pursuant to 20.2.70.302.E.1 NMAC.

Whetham, Walter [Los Alamos National Laboratory

2012-03-15T23:59:59.000Z

472

Cryogenic & Gas System Piping Pressure Tests (A Collection of PT Permits)  

Science Conference Proceedings (OSTI)

This engineering note is a collection of pipe pressure testing documents for various sections of piping for the D-Zero cryogenic and gas systems. High pressure piping must conform with FESHM chapter 5031.1. Piping lines with ratings greater than 150 psig have a pressure test done before the line is put into service. These tests require the use of pressure testing permits. It is my intent that all pressure piping over which my group has responsibility conforms to the chapter. This includes the liquid argon and liquid helium and liquid nitrogen cryogenic systems. It also includes the high pressure air system, and the high pressure gas piping of the WAMUS and MDT gas systems. This is not an all inclusive compilation of test documentation. Some piping tests have their own engineering note. Other piping section test permits are included in separate safety review documents. So if it isn't here, that doesn't mean that it wasn't tested. D-Zero has a back up air supply system to add reliability to air compressor systems. The system includes high pressure piping which requires a review per FESHM 5031.1. The core system consists of a pressurized tube trailer, supply piping into the building and a pressure reducing regulator tied into the air compressor system discharge piping. Air flows from the trailer if the air compressor discharge pressure drops below the regulator setting. The tube trailer is periodically pumped back up to approximately 2000 psig. A high pressure compressor housed in one of the exterior buildings is used for that purpose. The system was previously documented, tested and reviewed for Run I, except for the recent addition of piping to and from the high pressure compressor. The following documents are provided for review of the system: (1) Instrument air flow schematic, drg. 3740.000-ME-273995 rev. H; (2) Component list for air system; (3) Pressure testing permit for high pressure piping; (4) Documentation from Run I contained in D-Zero Engineering note 3740.214-EN-268, John Urbin 11120/90; (5) Pressure test procedure; (6) Schematic for pressure test; and (7) List of component pressure ratings. The goal of this independent review is to: (1) Reviewer makes recommendation to the Division/Section Safety Officer to approve the testing permit; and (2) Reviewer is satisfied the FESHM 5031 is met, and recommends to the division head that approval to operate be granted.

Rucinski, Russell A.; /Fermilab

2002-08-22T23:59:59.000Z

473

GRR/Section 14-UT-b - Utah Pollutant Discharge Elimination System | Open  

Open Energy Info (EERE)

GRR/Section 14-UT-b - Utah Pollutant Discharge Elimination System GRR/Section 14-UT-b - Utah Pollutant Discharge Elimination System < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-UT-b - Utah Pollutant Discharge Elimination System 14UTBUtahPollutantDischargeEliminationSystemPermit.pdf Click to View Fullscreen Contact Agencies Utah Division of Water Quality Utah Department of Environmental Quality United States Environmental Protection Agency Regulations & Policies R317-2-3 Antidegradation Policy R317-8 Utah Pollutant Discharge Elimination System (UPDES) Triggers None specified Click "Edit With Form" above to add content 14UTBUtahPollutantDischargeEliminationSystemPermit.pdf 14UTBUtahPollutantDischargeEliminationSystemPermit.pdf Error creating thumbnail: Page number not in range.

474

Building, landscape and section  

E-Print Network (OSTI)

All buildings have in their section a relationship to the landscape on which they are sited. Therefore we as inhabitants of these buildings may or may not have a relationship with the landscape. It is the supposition of ...

Johnson, Daniel B. (Daniel Bryant)

1992-01-01T23:59:59.000Z

475

Cross-section  

NLE Websites -- All DOE Office Websites (Extended Search)

Cross-section Cross-section formulae for specific processes 1 39. CROSS-SECTION FORMULAE FOR SPECIFIC PROCESSES Revised September 2005 by R.N. Cahn (LBNL). Setting aside leptoproduction (for which, see Sec. 16), the cross sections of primary interest are those with light incident particles, e + e - , γγ, qq, gq , gg, etc., where g and q represent gluons and light quarks. The produced particles include both light particles and heavy ones - t, W , Z, and the Higgs boson H. We provide the production cross sections calculated within the Standard Model for several such processes. 39.1. Resonance Formation Resonant cross sections are generally described by the Breit-Wigner formula (Sec. 16 of this Review). σ(E) = 2J + 1 (2S 1 + 1)(2S 2 + 1) 4π k 2 Γ 2 /4 (E - E 0 ) 2 + Γ 2 /4 B in B out , (39.1) where E is the c.m. energy, J is the spin of the resonance, and the number of polarization states of the two incident particles

476

Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Westinghouse and Fuzhou Permitted to Restart Distribution of Light Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products August 6, 2010 - 4:26pm Addthis The Department has issued Notices of Allowance to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company determining, based on corrected test data provided by Westinghouse, that the incandescent reflector lamps listed below are compliant with the federal energy conservation standard and may be sold in the United States. These 11 Westinghouse brand lamps, usually used in recessed light fixtures, correspond to 7 basic models, which are manufactured in China by Fuzhou. DOE had previously issued Notices requiring Fuzhou and Westinghouse to

477

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42: Reauthorization of Permits, Maintenance, and Vegetation 42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah Summary This EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx.

478

OpenEI Community - water + monitoring + Nevada + permitting  

Open Energy Info (EERE)

Meeting #2 - Meeting #2 - Regulatory Issues http://en.openei.org/community/blog/nevada-meeting-2-regulatory-issues The second Nevada permitting meeting was held Tuesday, July 24th in Reno, and was attended by approximately 15 people from industry and agencies.  Participants reviewed the Nevada Geothermal Regulatory roadmaps that had been reviewed and revised in the first Nevada meeting.  During this meeting, identified potential issues they've encountered in permitting in Nevada. read more http://en.openei.org/community/blog/nevada-meeting-2-regulatory-issues#comments water + monitoring + Nevada + permitting Geothermal Regulatory Roadmap Fri,

479

File:03CODAccessPermit (1).pdf | Open Energy Information  

Open Energy Info (EERE)

CODAccessPermit (1).pdf CODAccessPermit (1).pdf Jump to: navigation, search File File history File usage File:03CODAccessPermit (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 47 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:13, 12 February 2013 Thumbnail for version as of 16:13, 12 February 2013 1,275 × 1,650 (47 KB) Dfitzger (Talk | contribs) 16:12, 7 February 2013 Thumbnail for version as of 16:12, 7 February 2013 1,275 × 1,650 (47 KB) Dfitzger (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

480

File:Archaeology excavation permit.pdf | Open Energy Information  

Open Energy Info (EERE)

Archaeology excavation permit.pdf Archaeology excavation permit.pdf Jump to: navigation, search File File history File usage File:Archaeology excavation permit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 201 KB, MIME type: application/pdf, 7 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:58, 20 November 2012 Thumbnail for version as of 13:58, 20 November 2012 1,275 × 1,650, 7 pages (201 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

Note: This page contains sample records for the topic "bird permit section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Improving Performance of Federal Permitting and Review of Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Improving Performance of Federal Permitting and Review of Infrastructure Improving Performance of Federal Permitting and Review of Infrastructure Projects Improving Performance of Federal Permitting and Review of Infrastructure Projects The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability, in collaboration with the Member Agencies of the Steering Committee (Member Agencies) created under Executive Order 13604 of March 22, 2012, and pursuant to the June 7, 2013 Transmission Presidential Memorandum, is seeking public input on a draft Integrated, Interagency Pre-Application (IIP) Process. The proposed IIP Process is intended to improve interagency and intergovernmental coordination focused on ensuring that project proponents develop and submit accurate and complete information early in the project planning process to facilitate efficient

482

DOE Hydrogen and Fuel Cells Program: Permitting Hydrogen Facilities Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Fueling Stations Telecommunication Fuel Cell Use Hazard and Risk Analysis U.S. Department of Energy Hydrogen Fueling Stations Telecommunication Fuel Cell Use Hazard and Risk Analysis U.S. Department of Energy The objective of this U.S. Department of Energy Hydrogen Permitting Web site is to help local permitting officials deal with proposed hydrogen fueling stations, fuel cell installations for telecommunications backup power, and other hydrogen projects. Resources for local permitting officials who are looking to address project proposals include current citations for hydrogen fueling stations and a listing of setback requirements on the Alternative Fuels & Advanced Vehicle Data Center Web site. In addition, this overview of telecommunications fuel cell use and an animation that demonstrates telecommunications site layout using hydrogen fuel cells for backup power should provide helpful

483

File:03HICEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

3HICEncroachmentPermit.pdf 3HICEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03HICEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:43, 12 November 2012 Thumbnail for version as of 11:43, 12 November 2012 1,275 × 1,650 (45 KB) Alevine (Talk | contribs) 12:20, 23 October 2012 Thumbnail for version as of 12:20, 23 October 2012 1,275 × 1,650 (50 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

484

File:Permit factsheet.pdf | Open Energy Information  

Open Energy Info (EERE)

Permit factsheet.pdf Permit factsheet.pdf Jump to: navigation, search File File history File usage Metadata File:Permit factsheet.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 31 KB, MIME type: application/pdf, 3 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:50, 12 June 2013 Thumbnail for version as of 10:50, 12 June 2013 1,275 × 1,650, 3 pages (31 KB) Apalazzo (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file.

485

File:03AKELandUsePermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AKELandUsePermit.pdf AKELandUsePermit.pdf Jump to: navigation, search File File history File usage File:03AKELandUsePermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 71 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:00, 18 October 2012 Thumbnail for version as of 11:00, 18 October 2012 1,275 × 1,650 (71 KB) Jnorris (Talk | contribs) 11:35, 6 August 2012 Thumbnail for version as of 11:35, 6 August 2012 1,275 × 1,650 (56 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

486

Energy Generation Project Permitting (Vermont) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Project Permitting (Vermont) Generation Project Permitting (Vermont) Energy Generation Project Permitting (Vermont) < Back Eligibility Construction Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Environmental Regulations Provider Agency of Natural Resources The Vermont Energy Generation Siting Policy Commission is mandated to survey best practices for siting approval of electric generation projects (all facilities except for net- and group-net-metered facilities) and for public participation and representation in the siting process, and to report to the Governor and to the Vermont Legislature on their findings by

487

Extension of Comment Period on Improving Performance of Federal Permitting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

488

Extension of Comment Period on Improving Performance of Federal Permitting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

489

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be