Powered by Deep Web Technologies
Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Big Eddy-Knight  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Big Eddy-Knight Transmission Project BPA has decided to...

2

Big Eddy-Knight Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4 miles northwest of...

3

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

4

Microsoft Word - FEIS-0421-SA-01-Big Eddy-KnightDesignAdjustmentFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Big Eddy-Knight Transmission Project Final EIS (DOE/EIS-0421/SA-1) Emmanuel Jaramillo Project Manager - TEP-TPP-1 Proposed Action: Big Eddy-Knight Transmission Project design adjustments Proposed by: Bonneville Power Administration (BPA) Location: Wasco County, Oregon and Klickitat County, Washington Background: In 2011, BPA completed the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421) and issued a Record of Decision (ROD) documenting its decision to build and operate the Big Eddy-Knight transmission line. Construction of the transmission line began in fall 2011 and is currently underway. Through construction and further detailed design work, project adjustments have been identified. The

5

Microsoft Word - Big Eddy ROD.doc  

Broader source: Energy.gov (indexed) [DOE]

Administration's Administration's Big Eddy-Knight Transmission Project Record of Decision September 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. As described in the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421, July 2011), this project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that will be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. For the

6

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

7

BPA-2012-01929-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Portland District. DNR is lead agency for SEPA review of the Bid Eddy-Knight transmission line project. DNR has commented on BPAs Big Eddy Knight Draft EIS in order to facilitate...

8

Olympia-Grand Coulee No. 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission...

9

Home  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington...

10

EIS-0421: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA...

11

EIS-0421: Notice of Intent to Prepare an Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

of Intent to Prepare an Environmental Impact Statement and Notice of Floodplain and Wetlands Involvement for Bonneville Power Administration Big Eddy-Knight Transmission Project...

12

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

13

Microsoft Word - BE-K_SA-2_112812  

Broader source: Energy.gov (indexed) [DOE]

F F United States Government Department of Energy Bonneville Power Administration DATE: November 28, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Big Eddy-Knight Transmission Project Final EIS (DOE/EIS- 0421/SA-02) Nathan Mullen Project Manager - TELP-TPP-3 Proposed Action: Big Eddy-Knight Transmission Project new information and design adjustments Proposed by: Bonneville Power Administration (BPA) Location: Klickitat County, Washington Background: In 2011, BPA completed the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421) and issued a Record of Decision (ROD) documenting its decision to build and operate the Big Eddy-Knight transmission line. Construction of the transmission

14

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

15

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

16

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

17

Notices  

Broader source: Energy.gov (indexed) [DOE]

394 Federal Register 394 Federal Register / Vol. 76, No. 186 / Monday, September 26, 2011 / Notices www.oakridge.doe.gov/em/ssab/ minutes.htm. Issued at Washington, DC on September 21, 2011. LaTanya R. Butler, Acting Deputy Committee Management Officer. [FR Doc. 2011-24614 Filed 9-23-11; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Bonneville Power Administration Big Eddy-Knight Transmission Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to implement the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. Construction of the Big Eddy-Knight Transmission Project will accommodate long-term

18

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1 Ed Tompkins Natural Resource Specialist-TFO/LMT Proposed Action: Removal of danger trees along the Big Eddy-Ostrander-1 transmission line corridor. This corridor also includes segments of the Big Eddy-Troutdale, Ostrander-Troutdale, Big Eddy-McLoughlin and Bid Eddy-Chemawa transmission lines. Referencing the Big-Eddy- Ostrander-1 transmission line, the project extends from tower 39/3 to 72/2. The portion of the ROW extending from 39/3 west to 44/5+313 falls within the Zigzag Ranger District of the Mt. Hood National Forest, Clackamas County, Oregon. All work conducted

19

Microsoft PowerPoint - BE-K_update_CF38_final [Compatibility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Eddy-Knight 500kV Transmission Line Project 10292013 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presentation Objectives Provide an update on the BEK project...

20

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-147 (Big Eddy-Chenoweth NO. 1&2, Big Eddy - Midway & Chenoweth-Goldendale)  

Broader source: Energy.gov (indexed) [DOE]

1, 2003 1, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-147 (Big Eddy-Chenoweth NO. 1 &2, Big Eddy - Midway & Chenoweth- Goldendale) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Big Eddy-Chenoweth NO. 1 &2 Substation to Substation, Big Eddy - Midway Substation to 2/3) & Chenoweth-Goldendale (Substation to 2/3). Location: Project location is within Wasco County, Oregon & Klickitat County, Washington and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of-way.

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0421: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

: Record of Decision : Record of Decision EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington For more information contact: Ms. Stacy Mason, Environmental Coordinator Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-5455 Electronic mail: slmason@bpa.gov BPA has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. This project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA?s existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4

22

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

23

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

24

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

21: EPA Notice of Availability of the Draft Environmental 21: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

25

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1)(3/19/03)  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1) Libby Johnson Natural Resource Specialist - TFR/THE DALLES Proposed Action: Vegetation Management for portion of the Big Eddy - Ostrander #1 500 kV transmission line located from tower structure 31/2 to 39/3. Location: Project location is in BPA Redmond Region in Hood River County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

26

Microsoft Word - Appendix A - Living and Working.doc  

Broader source: Energy.gov (indexed) [DOE]

2: Appendices 2: Appendices July 2011 DOE/EIS-0421 Big Eddy-Knight Transmission Project Final EIS i July 2011 Table of Contents VOLUME 1: Environmental Analyses Summary S.1 Purpose of and Need for Action ......................................................................................... S-1 S.1.1 Background................................................................................................................... S-1 S.1.2 Public Involvement ....................................................................................................... S-2 S.2 Project Overview ............................................................................................................... S-2 S.2.1 Proposed Action Alternatives .......................................................................................

27

10011-001  

Broader source: Energy.gov (indexed) [DOE]

3: Comments and Responses 3: Comments and Responses July 2011 DOE/EIS-0421 Big Eddy-Knight Transmission Project Final EIS i July 2011 Table of Contents VOLUME 1: Environmental Analyses Summary S.1 Purpose of and Need for Action ......................................................................................... S-1 S.1.1 Background................................................................................................................... S-1 S.1.2 Public Involvement ....................................................................................................... S-2 S.2 Project Overview ............................................................................................................... S-2 S.2.1 Proposed Action Alternatives .......................................................................................

28

Big Science  

ScienceCinema (OSTI)

Big science seeks big solutions for the most urgent problems of our times. Video courtesy Cray, Inc.

Dr. Thomas Zacharia

2010-01-08T23:59:59.000Z

29

EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Broader source: Energy.gov (indexed) [DOE]

671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt...

30

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Broader source: Energy.gov (indexed) [DOE]

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

31

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

32

Big Weasels  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Weasels Big Weasels Nature Bulletin No. 512-A January 12, 1974 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation BIG WEASELS The Weasel Family includes the mink, skunks, otters, badger, martens and wolverine as well as the bloodthirsty little weasel -- all carnivorous fur-bearers having a pair of anal glands containing musky fluid which, except in the otters, badger and fisher, has a vile penetrating odor. The Pine Marten or American Sable, a little smaller than a house cat, is the tree-living member of the family. It dens and does much of its hunting in trees where it is a deadly enemy of squirrels and birds. On the ground it preys on marmots, chipmunks, hares, mice, grouse and reptiles. Honey, nuts and berries are eaten also. Aside from the lynx, eagles, owls and the fisher, a marten's chief enemy is man.

33

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

34

Complexity in Big History  

E-Print Network [OSTI]

Spier, Fred. “How Big History Works: Energy Flows and RiseSmil, Vaclav. Energy in World History. Boulder, CO: Westviewkg) Energy and complexity Spier: Complexity in Big History.

Spier, Fred

2011-01-01T23:59:59.000Z

35

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 3270 of 28,905 results. 61 - 3270 of 28,905 results. Download EIS-0421: EPA Notice of Availability of the Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA http://energy.gov/nepa/downloads/eis-0421-epa-notice-availability-final-environmental-impact-statement Download EIS-0489: Notice of Intent to Prepare an Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, Oregon) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, Oregon) http://energy.gov/nepa/downloads/eis-0489-notice-intent-prepare-environmental-impact-statement Download Reference Buildings by Climate Zone and Representative City: 3B Las Vegas, Nevada In addition to the ZIP file for each building type, you can directly view

36

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 1660 of 29,416 results. 51 - 1660 of 29,416 results. Download EIS-0421: EPA Notice of Availability of the Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA http://energy.gov/nepa/downloads/eis-0421-epa-notice-availability-final-environmental-impact-statement Download Federal NEPA Contacts CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law attorney, or member of agency leadership, these... http://energy.gov/nepa/downloads/federal-nepa-contacts Download EIS-0226: Final Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center

37

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 7870 of 29,416 results. 61 - 7870 of 29,416 results. Download EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project http://energy.gov/nepa/downloads/eis-0421-epa-notice-availability-draft-environmental-impact-statement Download EIS-0449: Notice of Adoption of the Final Environmental Impact Statement Blythe Solar Power Project http://energy.gov/nepa/downloads/eis-0449-notice-adoption-final-environmental-impact-statement Download CX-005844: Categorical Exclusion Determination Peninsula Light Company Line and Load Interconnection Request L0308 CX(s) Applied: B4.6 Date: 05/05/2011 Location(s): Mason County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005844-categorical-exclusion-determination

38

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 16240 of 29,416 results. 31 - 16240 of 29,416 results. Download Audit Report: DOE/IG-0869 Opportunities for Energy Savings at Department of Energy Facilities http://energy.gov/ig/downloads/audit-report-doeig-0869 Download DOE-HDBK-1145-2013 Radiological Safety Training for Plutonium Facilities This Handbook describes an implementation process for training as recommended in Implementation Guide G 441.1-1C, CH1, May 2008 and as outlined in DOE-STD-1098-2008, CN1, May 2009, Radiation Protection Programs Guide, DOE Radiological Control (the Radiological Control Standard - RCS). http://energy.gov/hss/downloads/doe-hdbk-1145-2013 Download EIS-0421: Record of Decision and Mitigation Action Plan Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA http://energy.gov/nepa/downloads/eis-0421-record-decision-and-mitigation-action-plan

39

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

891 - 2900 of 28,905 results. 891 - 2900 of 28,905 results. Download EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project http://energy.gov/nepa/downloads/eis-0421-epa-notice-availability-draft-environmental-impact-statement Download EIS-0449: Notice of Adoption of the Final Environmental Impact Statement Blythe Solar Power Project http://energy.gov/nepa/downloads/eis-0449-notice-adoption-final-environmental-impact-statement Download CX-006810: Categorical Exclusion Determination International lndustrial Energy Efficiency Training and Deployment (IIEETD) CX(s) Applied: A9, A11 Date: 09/15/2011 Location(s): Vermont Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-006810-categorical-exclusion-determination

40

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 7, 2011 October 7, 2011 CX-006814: Categorical Exclusion Determination Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project CX(s) Applied: B4.12 Date: 10/07/2011 Location(s): Dayton, Columbia County, Washington Office(s): Bonneville Power Administration September 28, 2011 CX-006957: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project - Seattle Public Utilities CX(s) Applied: B5.1 Date: 09/28/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office September 26, 2011 EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington September 26, 2011 CX-006843: Categorical Exclusion Determination ER52 Fire Station Warning Signals

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 6850 of 31,917 results. 41 - 6850 of 31,917 results. Download Intial Entry of Compentency Information http://energy.gov/management/downloads/intial-entry-compentency-information Download Microsoft Word- APRIL 2009 PMCDP Module CHRIS ESS Tutorial_INITIAL_ENTRY_OF_COMPETENCY_INFORMATION.doc http://energy.gov/management/downloads/microsoft-word-april-2009-pmcdp-module-chris-ess Download EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA http://energy.gov/nepa/downloads/eis-0421-draft-environmental-impact-statement Download CX-004691: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 12/16/2010 Location(s): Kirkland, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

42

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 6460 of 8,172 results. 51 - 6460 of 8,172 results. Download EIS-0421_EPANOA_2011.pdf http://energy.gov/nepa/downloads/eis-0421epanoa2011pdf Download Map Data: Renewable Production http://energy.gov/downloads/map-data-renewable-production Download Map Data: Total Production http://energy.gov/downloads/map-data-total-production Download April 2008 PMCDP Newsletter http://energy.gov/management/downloads/april-2008-pmcdp-newsletter Download March 2008 PMCDP Newsletter http://energy.gov/management/downloads/march-2008-pmcdp-newsletter Download Three Year Rolling Timeline http://energy.gov/management/downloads/three-year-rolling-timeline Download EIS-0421: EPA Notice of Availability of the Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat

43

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21 - 1230 of 26,777 results. 21 - 1230 of 26,777 results. Download Re: NBP RFI: Communications Requirements- Comments of AT&T Inc. http://energy.gov/gc/downloads/re-nbp-rfi-communications-requirements-comments-att-inc Download Comments of ATT&T Inc http://energy.gov/oe/downloads/comments-attt-inc Download New Reports and Other Materials Recently released reports, presentations, and other materials are available for download. http://energy.gov/oe/downloads/new-reports-and-other-materials Download WC_1999_002_CLASS_WAIVERUNIVERSITY_OF_CHICAGO_RESEARCH_AND_D.pdf http://energy.gov/gc/downloads/wc1999002classwaiveruniversityofchicagoresearchanddpdf Download EIS-0421: EPA Notice of Availability of the Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat

44

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 24590 of 28,905 results. 81 - 24590 of 28,905 results. Download EIS-0421-SA-2: Supplement Analysis Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA http://energy.gov/nepa/downloads/eis-0421-sa-2-supplement-analysis Article Fire Department Gets New Trucks, Saves Money RICHLAND, Wash. - Last year, the Hanford Fire Department (HFD) set out to replace its aging chemical truck used for metal fires. Originally purchased to respond to potential incidents at the Fast Flux Test Facility, the 31-year-old vehicle was at the end of its lifecycle. http://energy.gov/em/articles/fire-department-gets-new-trucks-saves-money Page TEC Working Group Members TEC members represent many different national, regional, tribal, state and local governmental, labor, industry and professional groups. To maximize

45

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 5160 of 9,640 results. 51 - 5160 of 9,640 results. Download Social Security Number Reduction Project Provides information regarding acceptable uses of the Social Security Number (SSN). http://energy.gov/cio/downloads/social-security-number-reduction-project Download China CERC, U.S. India and Other international Agreements http://energy.gov/gc/downloads/china-cerc-us-india-and-other-international-agreements Download EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA http://energy.gov/nepa/downloads/eis-0421-final-environmental-impact-statement Download CX-006710: Categorical Exclusion Determination Binary Power Unit Test (Recurrent Engineering LLC, Geothermal Test) CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Casper, Wyoming

46

After the Big Bang  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

After the Big Bang After the Big Bang Golden Age of Cosmology Big Bang Timeline Big Bang? Standard Big Bang Cosmology Slide 6 Big Bang Nucleosynthesis Redshift and Doppler Shift Doppler Shift Cepheid variables and Nebulae Standard Candles Hubble Expansion Hubble Law Cosmic Microwave Background Cosmic Background Explorer (1989-1993) COBE data/DMR CMB Fluctuations What is inflation? Why believe in inflation? Horizon Problem No inflation With inflation Flatness Problem Slide 24 Wilkinson Microwave Anisotropy Probe (2001-present) Fluctuations and geometry Universe's Baby Pictures Compare to COBE CMB vs. Inflation WMAP angular power spectrum Dark Matter Galaxy Rotation Curves Hot gas in Galaxy Clusters Dark Matter Halo Old view: Density of the Universe determines its destiny Hubble Expansion revisited

47

From Big Crunch to Big Bang  

E-Print Network [OSTI]

We consider conditions under which a universe contracting towards a big crunch can make a transition to an expanding big bang universe. A promising example is 11-dimensional M-theory in which the eleventh dimension collapses, bounces, and re-expands. At the bounce, the model can reduce to a weakly coupled heterotic string theory and, we conjecture, it may be possible to follow the transition from contraction to expansion. The possibility opens the door to new classes of cosmological models. For example, we discuss how it suggests a major simplification and modification of the recently proposed ekpyrotic scenario.

Justin Khoury; Burt A. Ovrut; Nathan Seiberg; Paul J. Steinhardt; Neil Turok

2001-08-24T23:59:59.000Z

48

CHARLOTTE: BIG DATA & ANALYTICS  

E-Print Network [OSTI]

CHARLOTTE: BIG DATA & ANALYTICS #12;Charlotte: Big Data & Analytics charlottechamber.com2 Many Corp. Carolina Handling, LLC Carolina Legal Staffing, LLC Compass Group North America DiscoverReady LLC Leader: Allen Naidoo, Carolinas HealthCare System . . . . . . . . 10 Thought Leader: Kelly Ross, Lowe

Raja, Anita

49

BIG GREEN SUV'S  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

'BIG GREEN SUVS' 'BIG GREEN SUVS' JESSICA SHEA CHOKSEY: Over the last couple of years, sales of full-size SUVs have been feeling a double punch of unstable gas prices, and a growing concern that their less than spectacular fuel economy is hurting the environment. But now, General Motors hopes to take the pain out of buying big. Waving the Green flag, GM is ready to offer consumers two full-size SUV hybrids, the 2008 Chevrolet Tahoe Hybrid and the GMC Yukon Hybrid. Using GM's "Two-Mode Full Hybrid" system, derived from its transit buses, these big-UTES are designed to maximize fuel savings for both urban and rural lifestyles. Like the typical gas-electric hybrid vehicle, the Tahoe and Yukon hybrids will enjoy a substantial boost in mileage in stop-and-go city driving. That means they can start off

50

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild  

Broader source: Energy.gov (indexed) [DOE]

17: Lovell-Yellowtail and Basin-Lovell Transmission Line 17: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana Summary DOE's Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

51

Big Bend sees big environmental push  

SciTech Connect (OSTI)

The 1800 MW Big Bend Power Station is a coal-fired facility in Tampa Bay, Florida, USA owned by Tampa Electric. It has four pulverized coal- fired steam units equipped with FGD scrubbers and electrostatic precipitators. Currently the addition of selective catalytic reduction (SCR) systems is under consideration. The Unit 4 SCR retrofit was completed in June 2007; the remaining three systems are scheduled for completion by 2010. Boiler draft systems will be modified to a balance draft design to accommodate the increased pressure drop of the new systems. 3-D computer models were developed to determine constructability due to the tight clearance at the site. 1 photo.

Blankinship, S.

2007-10-15T23:59:59.000Z

52

Big Questions: Missing Antimatter  

SciTech Connect (OSTI)

Einstein's equation E = mc2 is often said to mean that energy can be converted into matter. More accurately, energy can be converted to matter and antimatter. During the first moments of the Big Bang, the universe was smaller, hotter and energy was everywhere. As the universe expanded and cooled, the energy converted into matter and antimatter. According to our best understanding, these two substances should have been created in equal quantities. However when we look out into the cosmos we see only matter and no antimatter. The absence of antimatter is one of the Big Mysteries of modern physics. In this video, Fermilab's Dr. Don Lincoln explains the problem, although doesn't answer it. The answer, as in all Big Mysteries, is still unknown and one of the leading research topics of contemporary science.

Lincoln, Don

2013-08-27T23:59:59.000Z

53

(DOE/EIS-0285/SA-5): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-5) - Big Eddy-Ostrander...

54

Big Data, Big Impact: New Possibilities for International Development  

E-Print Network [OSTI]

0 Big Data, Big Impact: New Possibilities for International Development #12;1 Executive Summary for harnessing big data. #12;2 Financial Services Data gleaned from mobile money services can provide deep is able to predict the magnitude of a disease outbreak half way around the world. Similarly, an aid agency

Chen, Keh-Hsun

55

Before the Big Bang  

ScienceCinema (OSTI)

The second law of thermodynamics says, in effect, that things get more random as time progresses. Thus, we can deduce that the beginning of the universe - the Big Bang - must have been an extraordinarily precisely organized state. What was the nature of this state? How can such a special state have come about? In Penrose's talk, a novel explanation is suggested.

Roger Penrose

2010-09-01T23:59:59.000Z

56

ENGINEERING BIG IMPACT  

E-Print Network [OSTI]

--like sustainability, security, materials, health, and energy. MSU partners with national labs, Fortune 500 companies develop ideas for my dissertation project. ALOK WATVE, Doctoral Student, Computer Science #12;BIG FUTURE, behavior, security, health, gender, ethics, humanities, or the social sciences. If you are interested

57

Your Resources: Big Data  

Science Journals Connector (OSTI)

......stakeholders a process to review and correct information...Big data privacy standards The development...security and privacy standards for companies...memory, data mining, and probability...What's your plan? This article...of a successful plan, including making...process, based on a review of a diverse selection......

Helen Wilcox

2013-01-01T23:59:59.000Z

58

Before the Big Bang  

SciTech Connect (OSTI)

The second law of thermodynamics says, in effect, that things get more random as time progresses. Thus, we can deduce that the beginning of the universe - the Big Bang - must have been an extraordinarily precisely organized state. What was the nature of this state? How can such a special state have come about? In Penrose's talk, a novel explanation is suggested.

Roger Penrose

2007-02-06T23:59:59.000Z

59

Cost Controls Pay Off Big  

Science Journals Connector (OSTI)

Cost Controls Pay Off Big ... Biggest plus was the general improvement in the economy; but to this must be added successful efforts by industry to control costs. ...

1959-02-16T23:59:59.000Z

60

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Debunking Six Big Myths about Nuclear Weapons  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Debunking Six Big Myths about Nuclear Weapons National Security Science Latest Issue:December 2014 All Issues submit Debunking Six Big Myths about Nuclear Weapons Is it true...

62

BigFoot  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

216 216 BigFoot Characterizing Land Cover, LAI, and NPP at the Landscape Scale for EOS/MODIS Validation Field Manual Version 2.1 ORNL/TM-1999/216 Environmental Sciences Division BIGFOOT FIELD MANUAL VERSION 2.1 John L. Campbell Department of Forest Ecology and Management University of Wisconsin, Madison, WI 53706 jlcampb1@students.wisc.edu Sean Burrows Department of Forest Ecology and Management University of Wisconsin, Madison, WI 53706 burrows@calshp.cals.wisc.edu Stith Tom Gower Department of Forest Ecology and Management University of Wisconsin, Madison, WI 53706 stgower@facstaff.wisc.edu Warren B. Cohen Forest Science Department, Oregon State University c/o USDA Forest Service, Corvallis, OR 97331 cohenw@ccmail.orst.edu Environmental Sciences Division

63

Microsoft Word - CX-BigEddy-Ostrander_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Elizabeth Johnson - TFR-The Dalles Natural Resource Specialist Proposed Action: Perform routine access road maintenance within the Big Eddy-Ostrander No. 1 transmission line corridor Budget Information: Work Order # 00261716 PP&A Project No.: PP&A 1706 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA) Location: The project area is located along BPA's Big Eddy-Ostrander No. 1 transmission line

64

Big Picture 19912012 other industry  

E-Print Network [OSTI]

% Academic 49% Research 8% Consulting 11% Finance 12% other industry 20% Where are the ORC Ph.D. graduates Semiconductors Lincoln Vale NonAcademic Jobs Small Firms Big Firms ORC Alumni Startups Academic 49% Research 8

65

Big Bang Darkleosynthesis  

E-Print Network [OSTI]

In a popular class of models, dark matter comprises an asymmetric population of composite particles with short range interactions arising from a confined nonabelian gauge group. We show that coupling this sector to a well-motivated light mediator particle yields efficient darkleosynthesis, a dark-sector version of big-bang nucleosynthesis (BBN), in generic regions of parameter space. Dark matter self-interaction bounds typically require the confinement scale to be above \\Lambda_{QCD}, which generically yields large (>>MeV/dark-nucleon) binding energies. These bounds further suggest the mediator is relatively weakly coupled, so repulsive forces between dark-sector nuclei are much weaker than coulomb repulsion between standard-model nuclei, which results in an exponential barrier-tunneling enhancement over standard BBN. Thus, dark nuclei are easier to make and harder to break than visible species with comparable mass numbers. This process can efficiently yield a dominant population of states with masses significantly greater than the confinement scale and, in contrast to dark matter that is a fundamental particle, may allow the dominant form of dark matter to have high spin > 3/2.

Gordan Krnjaic; Kris Sigurdson

2014-06-04T23:59:59.000Z

66

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13_WEB  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power Administration's (BPA) Big Eddy-Redmond transmission line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: Approximately six miles southeast of The Dalles in Wasco County, Oregon. T1N, R14E, Sec 4, 5, 9, 20, 28, 29, and 33 Proposed by: BPA Description of the Proposed Action: BPA proposes to perform routine maintenance on the Big Eddy-Redmond, 230-kilovolt transmission line conductor. The proposed work includes re-sagging the transmission line, and replacing the transmission line hardware and transmission

67

Big Data and Patient Care  

Science Journals Connector (OSTI)

......It would be na ve to think political will can reverse decades of...hospital performance and at risk patients. To truly transform...trends across a population, at risks groups can be identified and...from undermining the case for investment in big data technology, budget......

Justin Whatling

2013-01-01T23:59:59.000Z

68

Big Explosives Experimental Facility - BEEF  

ScienceCinema (OSTI)

The Big Explosives Experimental Facility or BEEF is a ten acre fenced high explosive testing facility that provides data to support stockpile stewardship and other national security programs. At BEEF conventional high explosives experiments are safely conducted providing sophisticated diagnostics such as high speed optics and x-ray radiography.

None

2015-01-07T23:59:59.000Z

69

Big Things from Small Beginnings  

Broader source: Energy.gov [DOE]

Slide Presentation given by D. Bullen on behalf of Peter S. Winokur, Ph.D., Chairman Defense Nuclear Facilities Safety Board; prepared by D. Bullen, D. Owen, J. MacSleyne, and D. Minnema. Big Things from Small Beginnings. How seemingly unimportant situations can lead to significant, undesirable events.

70

Big Explosives Experimental Facility - BEEF  

SciTech Connect (OSTI)

The Big Explosives Experimental Facility or BEEF is a ten acre fenced high explosive testing facility that provides data to support stockpile stewardship and other national security programs. At BEEF conventional high explosives experiments are safely conducted providing sophisticated diagnostics such as high speed optics and x-ray radiography.

None

2014-10-31T23:59:59.000Z

71

NREL: Transmission Grid Integration - Glossary of Transmission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contingency events are big (many megawatt) and fast (within a few cycles). Demand response Voluntary (and compen-sated) load reduction used as a bulk system reliability...

72

Microsoft Word - John_Day-Big_Eddy_2-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Mark Kjelland Mark Kjelland Project Manager - TEP-TPP-3 Proposed Action: John Day-Big Eddy No. 2 500-kV Transmission Line Reconductor Budget Information: Work Order 232282 Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including...tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers and crossarms. Location: Sherman and Wasco counties, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to reconductor 3 approximately 1-mile long sections of the John Day-Big Eddy No. 2 500-kV transmission line. The project involves removing the

73

The hybrid big bang-big crunch method for solving crystal structure from powder diffraction data  

Science Journals Connector (OSTI)

The big bang-big crunch optimization method has been revised, combined with the simulated annealing technique and implemented in the latest version of the EXPO program for solving crystal structure from powder diffraction data.

Altomare, A.

2013-05-15T23:59:59.000Z

74

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

75

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

76

Big Tree Climate Fund | Open Energy Information  

Open Energy Info (EERE)

Name: Big Tree Climate Fund Place: Boulder, Colorado Zip: 80307 Sector: Carbon Product: Finances clean energy and carbon reduction projects through customers who buy RECs and VERs...

77

Big Efficieny for Small Manufacturing  

E-Print Network [OSTI]

Big Efficiency for Small Manufacturing Daniel Trombley American Council for an Energy-Efficient Economy Presented to: Industrial Energy Technology Conference New Orleans, LA May 21, 2014 ESL-IE-14-05-10 Proceedings of the Thrity-Sixth Industrial...-Sized Manufacturers http://www.aceee.org/research-report/ie1401 Daniel Trombley dtrombley@aceee.org www.aceee.org ESL-IE-14-05-10 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New Orleans, LA. May 20-23, 2014 ...

Trombley, D.

2014-01-01T23:59:59.000Z

78

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

79

Big Data, Enormous Opportunity Ed Lazowska  

E-Print Network [OSTI]

-100 of these machines #12;Regional Scale Nodes of the NSF Ocean Observatories IniFaFve 1000Big Data, Enormous Opportunity Ed Lazowska Bill & Melinda Gates ChairFal · Some non-science examples #12;What is "big data"? Dan Ariely #12;Exponen

Anderson, Richard

80

BIG SUN Energy Technology Incorporation | Open Energy Information  

Open Energy Info (EERE)

BIG SUN Energy Technology Incorporation Jump to: navigation, search Name: BIG SUN Energy Technology Incorporation Place: Taiwan Zip: 303 Sector: Solar Product: Taiwan-based solar...

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

82

DOE Drives Big Data Push  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Volume 9 Issue 2 2 Volume 9 Issue 2 From YAGS to Planetary Biology . . . . . . . . . . . . . . . 2 DOE Drives Big Data Push . . . . . . . . . . . . . . . . . . . . 3 Sweating Small Scale Genomics . . . . . . . . . . . . . . . 6 The Future of the DOE JGI . . . . . . . . . . . . . . . . . . . . 7 Save the Date for Meeting 8 . . . . . . . . . . . . . . . . . . . 8 also in this issue With a record 488 genomics researchers and bioinformaticians sitting in the Marriott Walnut Creek ballroom, New York Times science writer Carl Zimmer opened the DOE Joint Genome Institute's 7th Annual Genomics of Energy & Environment Meeting on March 20, 2012. Sharing his thoughts about being "On the Genome Beat," he informed the audience that he was worn down by seeing news about scientists successfully sequencing yet another genome sequence, and that "maybe some genomes shouldn't be written about." Zimmer's words engaged the audience in a discussion that

83

Big Mysteries: The Higgs Mass  

SciTech Connect (OSTI)

With the discovery of what looks to be the Higgs boson, LHC researchers are turning their attention to the next big question, which is the predicted mass of the newly discovered particles. When the effects of quantum mechanics is taken into account, the mass of the Higgs boson should be incredibly high...perhaps upwards of a quadrillion times higher than what was observed. In this video, Fermilab's Dr. Don Lincoln explains how it is that the theory predicts that the mass is so large and gives at least one possible theoretical idea that might solve the problem. Whether the proposed idea is the answer or not, this question must be answered by experiments at the LHC or today's entire theoretical paradigm could be in jeopardy.

Lincoln, Don

2014-04-28T23:59:59.000Z

84

BIG SKY CARBON SEQUESTRATION PARTNERSHIP  

SciTech Connect (OSTI)

The Big Sky Carbon Sequestration Partnership, led by Montana State University, is comprised of research institutions, public entities and private sectors organizations, and the Confederated Salish and Kootenai Tribes and the Nez Perce Tribe. Efforts under this Partnership in Phase I fall into four areas: evaluation of sources and carbon sequestration sinks that will be used to determine the location of pilot demonstrations in Phase II; development of GIS-based reporting framework that links with national networks; designing an integrated suite of monitoring, measuring, and verification technologies and assessment frameworks; and initiating a comprehensive education and outreach program. The groundwork is in place to provide an assessment of storage capabilities for CO{sub 2} utilizing the resources found in the Partnership region (both geological and terrestrial sinks), that would complement the ongoing DOE research. Efforts are underway to showcase the architecture of the GIS framework and initial results for sources and sinks. The region has a diverse array of geological formations that could provide storage options for carbon in one or more of its three states. Likewise, initial estimates of terrestrial sinks indicate a vast potential for increasing and maintaining soil C on forested, agricultural, and reclaimed lands. Both options include the potential for offsetting economic benefits to industry and society. Steps have been taken to assure that the GIS-based framework is consistent among types of sinks within the Big Sky Partnership area and with the efforts of other western DOE partnerships. The Partnership recognizes the critical importance of measurement, monitoring, and verification technologies to support not only carbon trading but all policies and programs that DOE and other agencies may want to pursue in support of GHG mitigation. The efforts in developing and implementing MMV technologies for geological sequestration reflect this concern. Research is also underway to identify and validate best management practices for soil C in the Partnership region, and to design a risk/cost effectiveness framework to make comparative assessments of each viable sink, taking into account economic costs, offsetting benefits, scale of sequestration opportunities, spatial and time dimensions, environmental risks, and long-term viability. Scientifically sound information on MMV is critical for public acceptance of these technologies.

Susan M. Capalbo

2005-01-31T23:59:59.000Z

85

Big Brothers needed in Northern New Mexico  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Brothers Needed in Northern New Mexico Big Brothers Needed in Northern New Mexico Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Big Brothers needed in Northern New Mexico If you can spare one lunch hour per week for a year, you can make a real difference in the life of a child through the "Lunch Buddies" program. January 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Research reveals that having a "Big" can have a positive, long-term influence on the children ages five through 18 who participate. If you can spare one lunch hour per week for a year, you can make a real difference in the life of a child through the "Lunch Buddies" program

86

Big Data | OpenEI Community  

Open Energy Info (EERE)

Big Data Big Data Home Ianjkalin's picture Submitted by Ianjkalin(84) Contributor 23 September, 2012 - 15:52 Datapalooza Announcements APIs Big Data Datapalooza EDI EERE Open Data OpenEI New data has been liberated! Rmckeel's picture Submitted by Rmckeel(297) Contributor 31 August, 2012 - 12:54 Visualize energy APIs with a new OpenEI browser APIs Big Data cleanweb data OpenEI OpenEI has created a simple way to see energy APIs available to developers. See commercial and free energy APIs such as NREL's developer network, Genability, 3TIER, OpenEI APIs and more! Click here to get started. Energy Data Initiative (EDI) Description: Liberating Data as Fuel for Innovation Initiative Vision: Transform gigabytes into actionable intelligence, which accelerates job creation. Fuel entrepreneurs with previously untapped

87

FUSION POWER Tokamak Test a Big Success  

Science Journals Connector (OSTI)

FUSION POWER Tokamak Test a Big Success ... Successful plasma production in the tokamak fusion test reactor at Princeton University's Plasma Physics Laboratory has set the stage for possible sustained fusion reactions in the device by 1990. ...

1983-01-10T23:59:59.000Z

88

Big Picture 1991-2011 other industry  

E-Print Network [OSTI]

% Where are the ORC Ph.D. graduates today? #12;Other (Math, Statistics, etc...) 8% Engineering School 27 10% Finance 12% other industry 20% Research 8% Small Firms Big Firms ORC Alumni Start-ups #12;Non

89

Big Blue Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Big Blue Wind Farm Big Blue Wind Farm Jump to: navigation, search Name Big Blue Wind Farm Facility Big Blue Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exergy Developer Exergy Energy Purchaser Xcel Energy Location Blue Earth MN Coordinates 43.64324946°, -94.22179699° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.64324946,"lon":-94.22179699,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

90

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

91

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

92

BIG SKY CARBON SEQUESTRATION PARTNERSHIP  

SciTech Connect (OSTI)

The Big Sky Carbon Sequestration Partnership, led by Montana State University, is comprised of research institutions, public entities and private sectors organizations, and the Confederated Salish and Kootenai Tribes and the Nez Perce Tribe. Efforts under this Partnership fall into four areas: evaluation of sources and carbon sequestration sinks; development of GIS-based reporting framework; designing an integrated suite of monitoring, measuring, and verification technologies; and initiating a comprehensive education and outreach program. At the first two Partnership meetings the groundwork was put in place to provide an assessment of capture and storage capabilities for CO{sub 2} utilizing the resources found in the Partnership region (both geological and terrestrial sinks), that would complement the ongoing DOE research. During the third quarter, planning efforts are underway for the next Partnership meeting which will showcase the architecture of the GIS framework and initial results for sources and sinks, discuss the methods and analysis underway for assessing geological and terrestrial sequestration potentials. The meeting will conclude with an ASME workshop. The region has a diverse array of geological formations that could provide storage options for carbon in one or more of its three states. Likewise, initial estimates of terrestrial sinks indicate a vast potential for increasing and maintaining soil C on forested, agricultural, and reclaimed lands. Both options include the potential for offsetting economic benefits to industry and society. Steps have been taken to assure that the GIS-based framework is consistent among types of sinks within the Big Sky Partnership area and with the efforts of other western DOE partnerships. Efforts are also being made to find funding to include Wyoming in the coverage areas for both geological and terrestrial sinks and sources. The Partnership recognizes the critical importance of measurement, monitoring, and verification technologies to support not only carbon trading but all policies and programs that DOE and other agencies may want to pursue in support of GHG mitigation. The efforts begun in developing and implementing MMV technologies for geological sequestration reflect this concern. Research is also underway to identify and validate best management practices for soil C in the Partnership region, and to design a risk/cost effectiveness framework to make comparative assessments of each viable sink, taking into account economic costs, offsetting benefits, scale of sequestration opportunities, spatial and time dimensions, environmental risks, and long-term viability. Scientifically sound information on MMV is critical for public acceptance of these technologies. Two key deliverables were completed in the second quarter--a literature review/database to assess the soil carbon on rangelands, and the draft protocols, contracting options for soil carbon trading. The protocols developed for soil carbon trading are unique and provide a key component of the mechanisms that might be used to efficiently sequester GHG and reduce CO{sub 2} concentrations. While no key deliverables were due during the third quarter, progress on other deliverables is noted in the PowerPoint presentations and in this report. A series of meetings held during the second and third quarters have laid the foundations for assessing the issues surrounding carbon sequestration in this region, the need for a holistic approach to meeting energy demands and economic development potential, and the implementation of government programs or a market-based setting for soil C credits. These meetings provide a connection to stakeholders in the region and a basis on which to draw for the DOE PEIS hearings. In the fourth quarter, three deliverables have been completed, some in draft form to be revised and updated to include Wyoming. This is due primarily to some delays in funding to LANL and INEEL and the approval of a supplemental proposal to include Wyoming in much of the GIS data sets, analysis, and related materials. The de

Susan M. Capalbo

2004-10-31T23:59:59.000Z

93

Big Sky Carbon Sequestration Partnership  

SciTech Connect (OSTI)

The Big Sky Carbon Sequestration Partnership, led by Montana State University, is comprised of research institutions, public entities and private sectors organizations, and the Confederated Salish and Kootenai Tribes and the Nez Perce Tribe. Efforts under this Partnership in Phase I are organized into four areas: (1) Evaluation of sources and carbon sequestration sinks that will be used to determine the location of pilot demonstrations in Phase II; (2) Development of GIS-based reporting framework that links with national networks; (3) Design of an integrated suite of monitoring, measuring, and verification technologies, market-based opportunities for carbon management, and an economic/risk assessment framework; (referred to below as the Advanced Concepts component of the Phase I efforts) and (4) Initiation of a comprehensive education and outreach program. As a result of the Phase I activities, the groundwork is in place to provide an assessment of storage capabilities for CO{sub 2} utilizing the resources found in the Partnership region (both geological and terrestrial sinks), that complements the ongoing DOE research agenda in Carbon Sequestration. The geology of the Big Sky Carbon Sequestration Partnership Region is favorable for the potential sequestration of enormous volume of CO{sub 2}. The United States Geological Survey (USGS 1995) identified 10 geologic provinces and 111 plays in the region. These provinces and plays include both sedimentary rock types characteristic of oil, gas, and coal productions as well as large areas of mafic volcanic rocks. Of the 10 provinces and 111 plays, 1 province and 4 plays are located within Idaho. The remaining 9 provinces and 107 plays are dominated by sedimentary rocks and located in the states of Montana and Wyoming. The potential sequestration capacity of the 9 sedimentary provinces within the region ranges from 25,000 to almost 900,000 million metric tons of CO{sub 2}. Overall every sedimentary formation investigated has significant potential to sequester large amounts of CO{sub 2}. Simulations conducted to evaluate mineral trapping potential of mafic volcanic rock formations located in the Idaho province suggest that supercritical CO{sub 2} is converted to solid carbonate mineral within a few hundred years and permanently entombs the carbon. Although MMV for this rock type may be challenging, a carefully chosen combination of geophysical and geochemical techniques should allow assessment of the fate of CO{sub 2} in deep basalt hosted aquifers. Terrestrial carbon sequestration relies on land management practices and technologies to remove atmospheric CO{sub 2} where it is stored in trees, plants, and soil. This indirect sequestration can be implemented today and is on the front line of voluntary, market-based approaches to reduce CO{sub 2} emissions. Initial estimates of terrestrial sinks indicate a vast potential for increasing and maintaining soil Carbon (C) on rangelands, and forested, agricultural, and reclaimed lands. Rangelands can store up to an additional 0.05 mt C/ha/yr, while the croplands are on average four times that amount. Estimates of technical potential for soil sequestration within the region in cropland are in the range of 2.0 M mt C/yr over 20 year time horizon. This is equivalent to approximately 7.0 M mt CO{sub 2}e/yr. The forestry sinks are well documented, and the potential in the Big Sky region ranges from 9-15 M mt CO{sub 2} equivalent per year. Value-added benefits include enhanced yields, reduced erosion, and increased wildlife habitat. Thus the terrestrial sinks provide a viable, environmentally beneficial, and relatively low cost sink that is available to sequester C in the current time frame. The Partnership recognizes the critical importance of measurement, monitoring, and verification technologies to support not only carbon trading but all policies and programs that DOE and other agencies may want to pursue in support of GHG mitigation. The efforts in developing and implementing MMV technologies for geological and terrestrial sequestration re

Susan Capalbo

2005-12-31T23:59:59.000Z

94

Interval type-2 fuzzy PID load frequency controller using Big Bang-Big Crunch optimization  

Science Journals Connector (OSTI)

This paper proposes an optimization based design methodology of interval type-2 fuzzy PID (IT2FPID) controllers for the load frequency control (LFC) problem. Hitherto, numerous fuzzy logic control structures are proposed as a solution of LFC. However, ... Keywords: Big Bang-Big Crunch optimization, Interval type-2 fuzzy PID controllers, Load frequency control

Engin Yesil

2014-02-01T23:59:59.000Z

95

IOL: Africa's big plans for biofuel Africa's big plans for biofuel  

E-Print Network [OSTI]

IOL: Africa's big plans for biofuel Africa's big plans for biofuel By Clare Byrne Visitors to Madagascar, Senegal to South Africa, biofuels is the buzzword as African countries wake up to the possibility of using their vast spaces to grow crops that reduce their fossil fuel bill. Biofuels also carry

96

Apple Tree, NH Big Tree for May By Anne Krantz, NH Big Tree Team,  

E-Print Network [OSTI]

Apple Tree, NH Big Tree for May By Anne Krantz, NH Big Tree Team, UNH Cooperative Extension The explosion of apple blossoms in May transforms the most gnarled old tree into a delicate cloud of beauty (1817-1862) in his essay "The Wild Apple Tree," described the blossoms perfectly: `The flowers

New Hampshire, University of

97

Report on the Night of the Big Wind The Big Wind of 1839 was  

E-Print Network [OSTI]

the sea, causing widespread flooding in some areas telling me how extremely strong this wind wasReport on the Night of the Big Wind The Big Wind of 1839 was Ireland's worst natural disaster. It brought hurricane force winds very rare in such a temperate climate during the night of 6th - 7th January

98

Neutrinos' Instant Identity Changes Could Mean Big Things for the Big Bang  

Broader source: Energy.gov (indexed) [DOE]

Neutrinos' Instant Identity Changes Could Mean Big Things for the Neutrinos' Instant Identity Changes Could Mean Big Things for the Big Bang Neutrinos' Instant Identity Changes Could Mean Big Things for the Big Bang July 11, 2011 - 12:23pm Addthis Scientists use the near detector to verify the intensity and purity of the muon neutrino beam leaving the Fermilab site. | Courtesy of Fermilab, photo by Peter Ginter Scientists use the near detector to verify the intensity and purity of the muon neutrino beam leaving the Fermilab site. | Courtesy of Fermilab, photo by Peter Ginter Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science What are the key facts? Researchers at Fermilab have been studying neutrinos and how they might change, or oscillate, between their three different identities -- electron, muon and tau.

99

Big Geysers Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Facility Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Big Geysers Geothermal Facility General Information Name Big Geysers Geothermal Facility Facility Big Geysers Sector Geothermal energy Location Information Location Clear Lake, California Coordinates 38.772688555979°, -122.72887229919° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.772688555979,"lon":-122.72887229919,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

100

Tackling Big Data Together | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Tackling Big Data Together Tackling Big Data Together Tackling Big Data Together February 21, 2013 - 5:43pm Addthis PNNL's Olympus supercomputer is one of the computational resources that will be used by members of the Northwest Institute for Advanced Computing. Other resources include the University of Washington's Hyak supercomputer and cloud computing. PNNL's Olympus supercomputer is one of the computational resources that will be used by members of the Northwest Institute for Advanced Computing. Other resources include the University of Washington's Hyak supercomputer and cloud computing. Michael Hess Michael Hess Former Digital Communications Specialist, Office of Public Affairs A powerful coupling: UW's eScience Institute has advanced data-driven discovery, and the university's computational programs in physics, chemistry and astronomy are

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

102

Big Rivers Electric Corp | Open Energy Information  

Open Energy Info (EERE)

NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility...

103

Microsoft Word - CX-Big Eddy-Redmond-WoodPolesFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 4, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Big Eddy-Redmond No. 1 Wood Pole Replacement Project PP&A Project No.: 2500 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Big Eddy-Redmond No. 1 transmission line in Deschutes County, Oregon, at the following locations: Mile Structure Township Range Section 35 6 5 14 24 36 6 5 14 25 36 7 5 14 25 36 8 5 14 25 37 6 5 14 36 40 9 6 15 18 43 2 6 15 29 48 4 7 1 21 49 1 7 1 21 50 6 7 15 33 51 8 8 15 5 52 8 8 15 8 53 3 8 15 8 54 2 8 15 17 56 1 8 1 30 58 2 9 14 1

104

Illuminating the Importance of Big Data | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Illuminating the Importance of Big Data Illuminating the Importance of Big Data Kareem Aggour 2012.07.12 Electricity-it's something we usually take for granted. Whether it's...

105

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

106

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

107

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

108

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

109

The Grizzly and the Big Brown Bears  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grizzly and the Big Brown Bears Grizzly and the Big Brown Bears Nature Bulletin No. 655-A November 12, 1977 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation THE GRIZZLY AND THE BIG BROWN BEARS In the early days, more tall tales were told about "Old Ephraim, " the grizzly bear, than any other animal. It had the reputation of being a bloodthirsty enemy of man and was given the scientific name Ursus horribilis by a taxonomist who had never seen a live one but had heard and read some of those yarns about its terrible ferocity and prodigious strength. The Grizzly is very intelligent and shrewd but, actually, has a rather phlegmatic disposition. It avoids people and will not attack unless provoked. Then, a female with cubs is unpredictable, and big game hunters say that a wounded grizzly is the most dangerous animal on earth. But ordinarily, as Earnest Thompson Seton observed, Ephraim is a peaceful giant who is perfectly satisfied to let you alone if you leave him alone.

110

THE BIG PICTURE: A "FISHERY SYSTEM APPROACH"  

E-Print Network [OSTI]

fishery management, with biodiversity an aspect of marine conservation that has received little attentionTHE BIG PICTURE: A "FISHERY SYSTEM APPROACH" LINKS FISHERY MANAGEMENT AND BIODIVERSITY Anthony Canada Email: t.charles@smu.ca Keywords : Fishery Management, Biodiversity, Fishery System Approach

Charles, Anthony

111

Conference: Big money at teacher conference  

Science Journals Connector (OSTI)

Conference: Big money at teacher conference Conference: Physics truly is international Advancing science: Physics education fun in York Festival: A science fair in the middle of the street Website: Physics ethics project launches website Competition: UK Olympiad team goes to Iran Forthcoming Events

112

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

113

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

114

UCR Recreation Department Big Bear Lake House Policies  

E-Print Network [OSTI]

UCR Recreation Department Big Bear Lake House Policies The UCR Recreation Department strives of service animals. 15. The UCR Recreation Department Big Bear Lake House is a non-smoking facility. 16 Agreement with them while staying at the facility. 18. The UCR Recreation Department big Bear Lake House

Mills, Allen P.

115

EIS-0315-S1: SEIS on Caithness Big Sandy Project  

Broader source: Energy.gov [DOE]

In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS.

116

Do big dads make big babies? Paternal effects on larval performance in red-eyed treefrogs of Belize (Agalychnis callidryas,  

E-Print Network [OSTI]

131 Do big dads make big babies? Paternal effects on larval performance in red-eyed treefrogs performance, owing to genetic variation among sires in two species of red-eyed treefrogs (Agalychnis

Mazzotti, Frank

117

Visualizing Distributed Data with BigWig and BigBed at UCSC (2010 JGI/ANL HPC Workshop)  

ScienceCinema (OSTI)

Jim Kent from University of California, Santa Cruz presents on "Visualizing Distributed Data with BigWig and BigBed at UCSC" at the JGI/Argonne HPC Workshop on January 26, 2010.

Kent, Jim [UCSC

2011-06-08T23:59:59.000Z

118

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

119

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

120

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Biomass Investment Group Inc BIG | Open Energy Information  

Open Energy Info (EERE)

Investment Group Inc BIG Investment Group Inc BIG Jump to: navigation, search Name Biomass Investment Group Inc (BIG) Place Asheville, North Carolina Zip 28806 Sector Biomass Product Developing large-scale production of biomass resources using environmentally-friendly and sustainable production systems and conversion technologies. References Biomass Investment Group Inc (BIG)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Biomass Investment Group Inc (BIG) is a company located in Asheville, North Carolina . References ↑ "Biomass Investment Group Inc (BIG)" Retrieved from "http://en.openei.org/w/index.php?title=Biomass_Investment_Group_Inc_BIG&oldid=342850" Categories:

122

Big Sky Wind Facility | Open Energy Information  

Open Energy Info (EERE)

Sky Wind Facility Sky Wind Facility Jump to: navigation, search Name Big Sky Wind Facility Facility Big Sky Wind Facility Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Edison Mission Energy Developer Edison Mission Energy Energy Purchaser PJM Market Location Bureau County IL Coordinates 41.579967°, -89.46177° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.579967,"lon":-89.46177,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

123

Little critters, big energy | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Little critters, big energy Little critters, big energy ORNL team receives $2 million to study use of microbial electrolysis in biorefineries Abhijeet Borole assembles a microbial electrolysis cell to assess the hydrogen production from the bio-oil aqueous phase. Abhijeet Borole assembles a microbial electrolysis cell to assess the hydrogen production from the bio-oil aqueous phase. (hi-res image) Tennessee scientists are using one of Earth's smallest creatures to solve some of the government's biggest bioenergy problems. For the next three years, a $2.1 million grant is allowing researchers at Oak Ridge National Laboratory to use a process called microbial electrolysis to transform plant biomass into hydrogen to produce energy-rich biofuel for use in combustion engines. With conventional technology, industries convert biomass into

124

Big Crunch-based omnidirectional light concentrators  

E-Print Network [OSTI]

Omnidirectional light concentration remains an unsolved problem despite such important practical applications as design of efficient mobile photovoltaic cells. Optical black hole designs developed recently offer partial solution to this problem. However, even these solutions are not truly omnidirectional since they do not exhibit a horizon, and at large enough incidence angles light may be trapped into quasi-stationary orbits around such imperfect optical black holes. Here we propose and realize experimentally another gravity-inspired design of a broadband omnidirectional light concentrator based on the cosmological Big Crunch solutions. By mimicking the Big Crunch spacetime via corresponding effective optical metric we make sure that every photon world line terminates in a single point.

Igor I. Smolyaninov; Yu-Ju Hung

2014-05-16T23:59:59.000Z

125

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

126

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

127

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

128

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

129

Big Canyon Creek Ecological Restoration Strategy.  

SciTech Connect (OSTI)

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality

Rasmussen, Lynn; Richardson, Shannon

2007-10-01T23:59:59.000Z

130

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

131

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

132

Big Green Bus: A Vehicle for Change | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Big Green Bus: A Vehicle for Change Big Green Bus: A Vehicle for Change Big Green Bus: A Vehicle for Change July 1, 2010 - 3:35pm Addthis The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | Joshua DeLung Twelve Dartmouth College students stopped at the U.S. Department of Energy Monday in a Big Green Bus, a 1989 MCI coach with an engine modified to run on waste vegetable oil. The students' goals are to promote alternative fuels and sustainable living with the slogan "Vehicle for

133

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

134

NETL: Carbon Storage - Big Sky Carbon Sequestration Partnership  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BSCSP BSCSP Carbon Storage Big Sky Carbon Sequestration Partnership MORE INFO Additional information related to ongoing BSCSP efforts can be found on their website. The Big Sky Carbon Sequestration Partnership (BSCSP) is led by Montana State University-Bozeman and represents a coalition of more than 60 organizations including universities, national laboratories, private companies, state agencies, Native American tribes, and international collaborators. The partners are engaged in several aspects of BSCSP projects and contribute to the efforts to deploy carbon storage projects in the BSCSP region. The BSCSP region encompasses Montana, Wyoming, Idaho, South Dakota, and eastern Washington and Oregon. BSCSP Big Sky Carbon Sequestration Partnership Region Big Sky Carbon Sequestration Partnership Region

135

Big Data and Analytics at Work | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Flipkart spoke on India's very own Big Data project - Aadhaar (Unique Identification for Indian citizens), how the solution has been architected, deployed and managed. An...

136

LDRD symposium focuses on materials in extremes, big data, and...  

National Nuclear Security Administration (NNSA)

symposium focuses on materials in extremes, big data, and energy use impacts | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing...

137

The Next Big Thing - Eric Haseltine  

ScienceCinema (OSTI)

Eric Haseltine, Haseltine Partners president and former chief of Walt Disney Imagineering, presented "The Next Big Thing," on Sept. 11, at the ORNL. He described the four "early warning signs" that a scientific breakthrough is imminent, and then suggested practical ways to turn these insights into breakthrough innovations. Haseltine is former director of research at the National Security Agency and associate director for science and technology for the director of National Intelligence, former executive vice president of Walt Disney Imagineering and director of engineering for Hughes Aircraft. He has 15 patents in optics, special effects and electronic media, and more than 100 publications in science and technical journals, the web and Discover Magazine.

Eric Haseltine

2010-01-08T23:59:59.000Z

138

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Broader source: Energy.gov [DOE]

The Department of the Interior’s Bureau of Indian Affairs is preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency.

139

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

140

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

142

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

143

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

144

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

145

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

146

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

147

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

148

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

149

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

150

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

151

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

152

Implementing 'Big Open Data' in government through Open Collaboration  

E-Print Network [OSTI]

and possibilities Leveraging OOR Peter Yim cim3.com> Mike Dean Leo Obrst @mitre.org> Ken Baclawski Presented at the Joint DATA.GOV - ONTOLOG "Big Open Data" Session 17: � Introduction ... and the ongoing dialog - Peter Yim, Co-convener, ONTOLOG � The Ontology imperative for Big

Baclawski, Kenneth B.

153

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

154

Big Daddy s Biodiesel Inc | Open Energy Information  

Open Energy Info (EERE)

Daddy s Biodiesel Inc Daddy s Biodiesel Inc Jump to: navigation, search Name Big Daddy's Biodiesel Inc Place Hereford, Texas Zip 79045 Product Biodiesel producer in Hereford, Texas. References Big Daddy's Biodiesel Inc[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Big Daddy's Biodiesel Inc is a company located in Hereford, Texas . References ↑ "Big Daddy's Biodiesel Inc" Retrieved from "http://en.openei.org/w/index.php?title=Big_Daddy_s_Biodiesel_Inc&oldid=342725" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

155

Big Questions for Social Media Big Data: Representativeness, Validity and Other Methodological Pitfalls  

E-Print Network [OSTI]

Large-scale databases of human activity in social media have captured scientific and policy attention, producing a flood of research and discussion. This paper considers methodological and conceptual challenges for this emergent field, with special attention to the validity and representativeness of social media big data analyses. Persistent issues include the over-emphasis of a single platform, Twitter, sampling biases arising from selection by hashtags, and vague and unrepresentative sampling frames. The socio-cultural complexity of user behavior aimed at algorithmic invisibility (such as subtweeting, mock-retweeting, use of "screen captures" for text, etc.) further complicate interpretation of big data social media. Other challenges include accounting for field effects, i.e. broadly consequential events that do not diffuse only through the network under study but affect the whole society. The application of network methods from other fields to the study of human social activity may not always be appropriat...

Tufekci, Zeynep

2014-01-01T23:59:59.000Z

156

BNL | QCD Matter, Big Bang Physics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

QCD Matter QCD Matter image Physicist Paul Sorensen next to the STAR detector at Brookhaven's Relativistic Heavy Ion Collider Exploring Matter at the Dawn of Time Brookhaven Lab leads the world in exploring how the matter that makes up atomic nuclei behaved just after the Big Bang. At that time, more than 13 billion years ago, there were no protons and neutrons-just a sea of "free" quarks and gluons, fundamental particles whose interactions are governed by nature's strongest force and described by the theory of quantum chromodynamics (QCD). More than 1,000 scientists from around the nation and the world come to Brookhaven to recreate this "quark-gluon plasma" by accelerating heavy ions (atoms stripped of their electrons) to nearly the speed of light and smashing them together at the Lab's

157

Big Horn 2 | Open Energy Information  

Open Energy Info (EERE)

2 2 Facility Big Horn 2 Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Energy Purchaser MSR Public Power Agency Location Near Bickleton WA Coordinates 45.871889°, -120.292354° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.871889,"lon":-120.292354,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

158

Big Bang Synthesis of Nuclear Dark Matter  

E-Print Network [OSTI]

We investigate the physics of dark matter models featuring composite bound states carrying a large conserved dark "nucleon" number. The properties of sufficiently large dark nuclei may obey simple scaling laws, and we find that this scaling can determine the number distribution of nuclei resulting from Big Bang Dark Nucleosynthesis. For plausible models of asymmetric dark matter, dark nuclei of large nucleon number, e.g. > 10^8, may be synthesised, with the number distribution taking one of two characteristic forms. If small-nucleon-number fusions are sufficiently fast, the distribution of dark nuclei takes on a logarithmically-peaked, universal form, independent of many details of the initial conditions and small-number interactions. In the case of a substantial bottleneck to nucleosynthesis for small dark nuclei, we find the surprising result that even larger nuclei, with size >> 10^8, are often finally synthesised, again with a simple number distribution. We briefly discuss the constraints arising from the...

Hardy, Edward; March-Russell, John; West, Stephen M

2014-01-01T23:59:59.000Z

159

New nuclear physics for big bang nucleosynthesis  

SciTech Connect (OSTI)

We discuss nuclear reactions which could play a role in big bang nucleosynthesis. Most of these reactions involve lithium and beryllium isotopes and the rates for some of these have not previously been included in BBN calculations. Few of these reactions are well studied in the laboratory. We also discuss novel effects in these reactions, including thermal population of nuclear target states, resonant enhancement, and nonthermal neutron reaction products. We perform sensitivity studies which show that even given considerable nuclear physics uncertainties, most of these nuclear reactions have minimal leverage on the standard BBN abundance yields of {sup 6}Li and {sup 7}Li. Although a few have the potential to alter the yields significantly, we argue that this is unlikely.

Boyd, Richard N. [Lawrence Livermore National Laboratory, Livermore, California 94551 (United States); Brune, Carl R. [Department of Physics and Astronomy, Ohio University, Athens, Ohio 45701 (United States); Fuller, George M. [Department of Physics, University of California, San Diego, La Jolla, California 92093-0319 (United States); Smith, Christel J. [Physics Department, Arizona State University, Tempe, Arizona 85287-1404 (United States)

2010-11-15T23:59:59.000Z

160

New Nuclear Physics for Big Bang Nucleosynthesis  

E-Print Network [OSTI]

We discuss nuclear reactions which could play a role in Big Bang Nucleosynthesis (BBN). Most of these reactions involve lithium and beryllium isotopes and the rates for some of these have not previously been included in BBN calculations. Few of these reactions are well studied in the laboratory. We also discuss novel effects in these reactions, including thermal population of nuclear target states, resonant enhancement, and non-thermal neutron reaction products. We perform sensitivity studies which show that even given considerable nuclear physics uncertainties, most of these nuclear reactions have minimal leverage on the standard BBN abundance yields of 6Li and 7Li. Although a few have the potential to alter the yields significantly, we argue that this is unlikely.

Richard N. Boyd; Carl R. Brune; George M. Fuller; Christel J. Smith

2010-08-04T23:59:59.000Z

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

162

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

163

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

164

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

165

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

166

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

167

Manhattan Project: The "Big House"  

Office of Scientific and Technical Information (OSTI)

THE "BIG HOUSE" THE "BIG HOUSE" Los Alamos Boys Ranch School and Los Alamos (The Town) Resources > Photo Gallery The "Big House," Los Alamos. The "Big House" was the dormitory for the Los Alamos Boys Ranch School. Students slept year-round on its unheated porches. During the Manhattan Project, the Big House contained, among other things, a library, the Chaplain's Office, and the Red Cross headquarters. Privileged guests and high-ranking civilians also sometimes stayed there. The photograph above is reproduced from Edith C. Truslow, with Kasha V. Thayer, ed., Manhattan Engineer District: Nonscientific Aspects of Los Alamos Project Y, 1942 through 1946 (Los Alamos, NM: Manhattan Engineer District, ca. 1946; first printed by Los Alamos Scientific Laboratory as LA-5200, March 1973; reprinted in 1997 by the Los Alamos Historical Society), 58. The photograph below is of a group of Ranch School students in front of the Big House; it is reproduced from "Dateline: Los Alamos," a special issue of the monthly publication of Los Alamos National Laboratory (1995), 7. At the bottom is an "establishing shot" of Los Alamos in which Fuller Lodge and the Big House are visible in the distance to the left and the right, respectively; click here for more information on this photograph.

168

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

169

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

170

Nanotechnology: Small Materials Making a Big Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nanotechnology: Small Materials Making a Big Impact Nanotechnology: Small Materials Making a Big Impact Nanotechnology: Small Materials Making a Big Impact December 14, 2010 - 12:35pm Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs This past Thursday, Secretary Chu delivered remarks to the Nanotechnology Innovation Summit in National Harbor, Maryland on how breakthroughs in nanotechnology are poised to transform the energy landscape. According to the National Nanotechnology Initiative, "Nanotechnology is the understanding and control of matter at dimensions between approximately 1 and 100 nanometers, where unique phenomena enable novel applications. Encompassing nanoscale science, engineering, and technology, nanotechnology involves imaging, measuring, modeling, and manipulating matter at this

171

Nanotechnology: Small Materials Making a Big Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nanotechnology: Small Materials Making a Big Impact Nanotechnology: Small Materials Making a Big Impact Nanotechnology: Small Materials Making a Big Impact December 14, 2010 - 12:35pm Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs This past Thursday, Secretary Chu delivered remarks to the Nanotechnology Innovation Summit in National Harbor, Maryland on how breakthroughs in nanotechnology are poised to transform the energy landscape. According to the National Nanotechnology Initiative, "Nanotechnology is the understanding and control of matter at dimensions between approximately 1 and 100 nanometers, where unique phenomena enable novel applications. Encompassing nanoscale science, engineering, and technology, nanotechnology involves imaging, measuring, modeling, and manipulating matter at this

172

Help Solve Solar's Big Challenge | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Help Solve Solar's Big Challenge Help Solve Solar's Big Challenge Help Solve Solar's Big Challenge December 2, 2013 - 1:00pm Addthis Soft costs now account for more than 60% of the total price of installing residential solar energy systems. View the full infographic to learn more. Soft costs now account for more than 60% of the total price of installing residential solar energy systems. View the full infographic to learn more. Soft costs now account for more than 60% of the total price of installing residential solar energy systems. View the full infographic to learn more.

173

Research Activities at Fermilab for Big Data Movement  

SciTech Connect (OSTI)

Adaptation of 100GE Networking Infrastructure is the next step towards management of Big Data. Being the US Tier-1 Center for the Large Hadron Collider's (LHC) Compact Muon Solenoid (CMS) experiment and the central data center for several other large-scale research collaborations, Fermilab has to constantly deal with the scaling and wide-area distribution challenges of the big data. In this paper, we will describe some of the challenges involved in the movement of big data over 100GE infrastructure and the research activities at Fermilab to address these challenges.

Mhashilkar, Parag; Wu, Wenji; Kim, Hyun W; Garzoglio, Gabriele; Dykstra, Dave; Slyz, Marko; DeMar, Phil

2013-01-01T23:59:59.000Z

174

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

175

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

176

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

177

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

178

New Efficiency Standards Mean Big Energy Savings for Consumers | Department  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Standards Mean Big Energy Savings for Consumers Efficiency Standards Mean Big Energy Savings for Consumers New Efficiency Standards Mean Big Energy Savings for Consumers May 16, 2012 - 4:22pm Addthis New Efficiency Standards Mean Big Energy Savings for Consumers April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this mean for me? By 2030, energy efficiency standards passed since 2009 will save nearly $350 billion total for consumers. Energy efficiency standards for residential clothes washers and dishwashers alone will save consumers approximately $20 billion in energy and water costs through 2030. As part of the Obama Administration's energy strategy, Energy Department officials have been hard at work helping American families save money by saving energy. Since 2009, we've issued nearly 40 common-sense energy

179

EA-1886: Big Sky Regional Carbon Sequestration Partnership - Phase III:  

Broader source: Energy.gov (indexed) [DOE]

886: Big Sky Regional Carbon Sequestration Partnership - Phase 886: Big Sky Regional Carbon Sequestration Partnership - Phase III: Large Volume CO2 Injection-Site Characterization, Well Drilling, and Infrastructure Development, Injection, MVA, and Site Closure, Kevin Dome, Toole County, Montana EA-1886: Big Sky Regional Carbon Sequestration Partnership - Phase III: Large Volume CO2 Injection-Site Characterization, Well Drilling, and Infrastructure Development, Injection, MVA, and Site Closure, Kevin Dome, Toole County, Montana SUMMARY This EA will evaluate the environmental impacts of a proposal for the Big Sky Carbon Sequestration Regional Partnership to demonstrate the viability and safety of CO2 storage in a regionally significant subsurface formation in Toole County, Montana and to promote the commercialization of future

180

EA-1886: Big Sky Regional Carbon Sequestration Partnership - Phase III:  

Broader source: Energy.gov (indexed) [DOE]

6: Big Sky Regional Carbon Sequestration Partnership - Phase 6: Big Sky Regional Carbon Sequestration Partnership - Phase III: Large Volume CO2 Injection-Site Characterization, Well Drilling, and Infrastructure Development, Injection, MVA, and Site Closure, Kevin Dome, Toole County, Montana EA-1886: Big Sky Regional Carbon Sequestration Partnership - Phase III: Large Volume CO2 Injection-Site Characterization, Well Drilling, and Infrastructure Development, Injection, MVA, and Site Closure, Kevin Dome, Toole County, Montana SUMMARY This EA will evaluate the environmental impacts of a proposal for the Big Sky Carbon Sequestration Regional Partnership to demonstrate the viability and safety of CO2 storage in a regionally significant subsurface formation in Toole County, Montana and to promote the commercialization of future

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Electrofuels: Tiny Organisms Making a Big Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electrofuels: Tiny Organisms Making a Big Impact Electrofuels: Tiny Organisms Making a Big Impact Electrofuels: Tiny Organisms Making a Big Impact February 16, 2012 - 12:30pm Addthis Electrofuels: Tiny Organisms Making a Big Impact Alexa McClanahan Communications Support Contractor to ARPA-E They say a picture is worth a thousand words - but what happens when what you want to look at is impossible to see? That's where the Advanced Research Projects Agency-Energy's Electrofuels program comes in. The 13 projects that make up the program seek to develop renewable liquid fuels that use microorganisms to harness chemical or electrical energy to convert carbon dioxide into liquid fuels, without using petroleum or biomass. For example, scientists at Columbia University are using bacteria to optimize the conversion of carbon dioxide and ammonia into a liquid transportation fuel

182

Big Sky Trust Fund (Montana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Big Sky Trust Fund (Montana) Big Sky Trust Fund (Montana) Big Sky Trust Fund (Montana) < Back Eligibility Commercial Local Government Tribal Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Home Weatherization Solar Program Info Start Date 2005 State Montana Program Type Grant Program Provider Montana Department of Commerce The Big Sky Trust Fund reimburses expenses incurred in the purchase, leasing, or relocation of real assets for direct use of the assisted business or employee training costs. A local or tribal government on behalf of any business may apply. The funding limit of the program is $5,000 per new qualifying job created or $7,500 per qualifying job created in a high poverty county. A dollar for dollar match (or 50% match in a high poverty

183

Big Windy (Great Escape Restaurant Turbine) | Open Energy Information  

Open Energy Info (EERE)

Big Windy (Great Escape Restaurant Turbine) Big Windy (Great Escape Restaurant Turbine) Jump to: navigation, search Name Big Windy (Great Escape Restaurant Turbine) Facility Big Windy (Great Escape Restaurant Turbine) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Great Escape Restaurant Location Schiller Park IL Coordinates 41.95547°, -87.865193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.95547,"lon":-87.865193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

184

Big Green Bus: A Vehicle for Change | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Green Bus: A Vehicle for Change Green Bus: A Vehicle for Change Big Green Bus: A Vehicle for Change July 1, 2010 - 3:35pm Addthis The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | The Big Green Bus rolled into Washington, D.C., and parked outside the Department of Energy offices Monday to showcase its clean energy features. | Photo Courtesy of Joshua Delung | Joshua DeLung Twelve Dartmouth College students stopped at the U.S. Department of Energy Monday in a Big Green Bus, a 1989 MCI coach with an engine modified to run on waste vegetable oil. The students' goals are to promote alternative fuels and sustainable living with the slogan "Vehicle for Change" on this sixth-annual cross-country educational tour.

185

Demonstration of Black Liquor Gasification at Big Island  

SciTech Connect (OSTI)

This Final Technical Report provides an account of the project for the demonstration of Black Liquor Gasification at Georgia-Pacific LLC's Big Island, VA facility. This report covers the period from May 5, 2000 through November 30, 2006.

Robert DeCarrera

2007-04-14T23:59:59.000Z

186

People's Physics Book Ch 8-1 The Big Idea  

E-Print Network [OSTI]

People's Physics Book Ch 8-1 The Big Idea When any two bodies in the universe interact, they can components are conserved. #12;People's Physics Book Ch 8-2 Key Concepts · Impulse is how momentum

California at Santa Cruz, University of

187

Taking Battery Technology from the Lab to the Big City  

Broader source: Energy.gov [DOE]

A small New York City startup is hoping it has the next big solution in energy storage. A video documents what the company's breakthrough means for the future of grid-scale energy storage.

188

Optimizing Database Load and Extract for Big Data Era  

Science Journals Connector (OSTI)

With growing and pervasive interest in Big Data, SQL relational databases need to compete with data management by Hadoop, NoSQL and NoDB. ... by query processing. But SQL databases require data in-place before qu...

K. T. Sridhar; M. A. Sakkeer

2014-01-01T23:59:59.000Z

189

WESTERN GREAT PLAINS BIG RIVER FLOODPLAIN extent exaggerated for display  

E-Print Network [OSTI]

WESTERN GREAT PLAINS BIG RIVER FLOODPLAIN G.Kittel extent exaggerated for display CAREX/GRAVEL SHORE SPARSELY VEGETATED ALLIANCE Riverine Gravel Flats Great Plains Sparse Vegetation POPULUS DELTOIDES Southern Plains Herbaceous Vegetation SYMPHORICARPOS OCCIDENTALIS TEMPORARILY FLOODED SHRUBLAND ALLIANCE

190

Project Summary The Big Green Challenge is NESTA's 1 million  

E-Print Network [OSTI]

Project Summary The Big Green Challenge is NESTA's £1 million prize fund to encourage will provide a greenhouse gas reduction initiative that can be cost-effectively replicated in communities

Everest, Graham R

191

CORAL the next big thing in supercomputing | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CORAL: the next big thing in supercomputing; next-gen machines for Oak Ridge, Argonne, Livermore January 17, 2014 Three of the nation's premier national labs - Oak Ridge, Argonne...

192

Big Data Projects on Solar Tech Evolution and Diffusion  

Broader source: Energy.gov [DOE]

This is the meeting agenda from the Big Data Projects on Solar Technology Evolution and Diffusion kickoff meeting, held on July 15, 2013 in Arlington, VA and facilitated by the SunShot Initiative.

193

March 27, 2008 Without BIG-2, odor maps stink  

E-Print Network [OSTI]

in an electrical signal transmitted to the brain's olfactory bulb (OB) - a 'relay station' in the circuitry of mouse OSNs was found to express BIG-2. Detailed analyses involving elaborate fluorescent

Kazama, Hokto

194

Big and Small Ideas: How to Lower Solar Financing Costs  

Broader source: Energy.gov [DOE]

DOE hosted the "Big & Small Ideas: How to Lower Solar Financing Costs" breakout session during the SunShot Grand Challenge Summit and Technology Forum. This session explored a range of...

195

BigFoot GPP and NPP Summaries, 2000-2004  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GPP and NPP Summaries, 2000-2004 GPP and NPP Summaries, 2000-2004 Reflectance data from MODIS, the Moderate Resolution Imaging Spectrometer onboard NASA's Earth Observing System (EOS) satellite Terra ( http://landval.gsfc.nasa.gov/MODIS/index.html ), is used to produce several science products including land cover, leaf area index (LAI), gross primary production (GPP) and net primary production (NPP). The overall goal of the BigFoot Project was to provide validation of these products. Background information on the BigFoot Project is available at: http://www.fsl.orst.edu/larse/bigfoot/index.html. A set of NPP/GPP summary figures was developed for each of the 9 BigFoot sites. Each set contains images and figures associated with creating the BigFoot NPP and GPP products, comparing them to MODIS products, and

196

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

197

Big Sky Carbon Sequestration Partnership--Validation Phase  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Sky Carbon Sequestration Big Sky Carbon Sequestration Partnership-Validation Phase Background The U.S. Department of Energy (DOE) has selected seven partnerships, through its Regional Carbon Sequestration Partnership (RCSP) initiative, to determine the best approaches for capturing and permanently storing carbon dioxide (CO 2 ), a greenhouse gas (GHG) which can contribute to global climate change. The RCSPs are made up of state and local agencies, coal companies, oil and gas companies, electric utilities,

198

Cognitive Energy Value Chain: Leveraging Big Data to Optimize Energy  

E-Print Network [OSTI]

20-23, 2014 - 8 -CEO Cognitive Energy Optimization Confidential Transforming The ‘Enterprise’ Cognitive Business Automation – Holistic Business Engine – Integrating the Enterprise – Business & Global Markets – Process Manufacturing Operations Big... FinancialMarket Big Data AnalyticsUniversal Engine providing Full Alignment IoT Web & Cloud Risk Mitigation ESL-IE-14-05-44 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New Orleans, LA. May 20-23, 2014 - 9 -CEO Cognitive Energy...

Birg, G.; Reitmeier, T.

2014-01-01T23:59:59.000Z

199

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

200

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

202

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

203

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

204

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

205

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

206

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

207

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

208

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

209

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

210

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

211

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

212

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

213

Department of Energy Supercomputer Helps Design More Efficient Big Rigs |  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Supercomputer Helps Design More Efficient Big Department of Energy Supercomputer Helps Design More Efficient Big Rigs Department of Energy Supercomputer Helps Design More Efficient Big Rigs February 8, 2011 - 12:00am Addthis Washington, DC - BMI Corporation, a company in South Carolina, in partnership with the Department of Energy's Oak Ridge National Laboratory (ORNL) has successfully developed a technology that will make semi trucks more fuel efficient with the potential to save millions of gallons of fuel. Utilizing the nation's most powerful computer, BMI Corp designed a SmartTruck UnderTray System, a set of integrated aerodynamic fairings that improve the aerodynamics of 18-wheeler (Class 8) long-haul trucks. If all 1.3 million Class 8 trucks in the U.S. were configured with these components, companies could achieve annual savings of 1.5 billion gallons

214

Power Marketing Administrations Poised to Make Another Big Contribution to  

Broader source: Energy.gov (indexed) [DOE]

Marketing Administrations Poised to Make Another Big Marketing Administrations Poised to Make Another Big Contribution to America's Progress Power Marketing Administrations Poised to Make Another Big Contribution to America's Progress March 16, 2012 - 9:00am Addthis Lauren Azar Senior Advisor to Secretary Chu Most Americans have never heard of the Department of Energy's Power Marketing Administrations (PMAs), but these four organizations are a crucial part of the country's electricity infrastructure - past, present and future. Starting with the Bonneville Power Administration in 1937, Congress established the Power Marketing Administrations to distribute and sell electricity from a network of more than 130 federally built hydroelectric dams, including the Hoover Dam, the Columbia River dams, and others throughout the United States. While the PMAs -- which also include the

215

Big Energy Savings for Small Idaho City | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Big Energy Savings for Small Idaho City Big Energy Savings for Small Idaho City Big Energy Savings for Small Idaho City September 30, 2010 - 4:28pm Addthis Renovations to Pinehurst’s City Hall are saving residents of this bedroom community $1,335 a year | Photo courtesy of Pinehurst Renovations to Pinehurst's City Hall are saving residents of this bedroom community $1,335 a year | Photo courtesy of Pinehurst Kevin Craft What are the key facts? Renovations to city hall will save Pinehurst, Id. $1,335 a year. The project is providing work for local contractor. New insulation cuts roof heat loss in half. The Pinehurst City Hall had been in need of renovations for quite some time. Constructed in the 1960s, the building had received few physical upgrades during its lifetime. Its flat roof and lack of insulation made the roof

216

Warm coats, big thanks | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Community / Warm coats, big thanks Community / Warm coats, big thanks Warm coats, big thanks Posted: January 9, 2014 - 2:23pm Over the last 12 years, Y-12ers have donated almost 7000 coats, sweaters and other winter wear to the Volunteer Ministry Center. As East Tennessee faces the coldest temperatures seen in a long while, Y-12ers have shown their volunteer spirit for the twelfth straight year by helping countless people stay warm thanks to another successful United Way Coat Drive to benefit the Volunteer Ministry Center. In total, the site donated 589 coats and winter wear items, 64 pairs of gloves, 47 scarves, and 66 hats and toboggans, which VMC makes available to the public through its Knoxville office. In addition, this year's efforts were expanded to include collection of toiletries for VMC. Y-12 collected more than 20 copy paper boxes full of

217

Big Bend Preventorium Greenhouse Low Temperature Geothermal Facility | Open  

Open Energy Info (EERE)

Preventorium Greenhouse Low Temperature Geothermal Facility Preventorium Greenhouse Low Temperature Geothermal Facility Jump to: navigation, search Name Big Bend Preventorium Greenhouse Low Temperature Geothermal Facility Facility Big Bend Preventorium Sector Geothermal energy Type Greenhouse Location Big Bend, California Coordinates 39.6982182°, -121.4608015° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

218

Going Big: Building the Largest Ever Energy Efficiency Project | Department  

Broader source: Energy.gov (indexed) [DOE]

Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project August 16, 2012 - 2:19pm Addthis New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to serve 8,000 Northwest homes. Construction of the chip pretreatment structure, shown here, is scheduled to be completed in 2013. | Photo courtesy of Bonneville Power Administration. New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to

219

Big Spring II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Big Spring II Wind Farm Big Spring II Wind Farm Facility Big Spring II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer York Research Energy Purchaser TXU Electric & Gas Location Howard County TX Coordinates 32.146715°, -101.398244° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.146715,"lon":-101.398244,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

220

New Boilers, Big Savings for Minnesota County | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

New Boilers, Big Savings for Minnesota County New Boilers, Big Savings for Minnesota County New Boilers, Big Savings for Minnesota County August 25, 2010 - 12:00pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Officials at Sherburne County's Government Center in Minnesota had a problem: the complex's original boilers, installed in 1972, were in desperate need of replacing. The two boilers were inefficient, labor intensive and well past their life expectancy. Any upgrades to the system were put on hold as the county tightened its purse strings amid a tough economy. "We kept asking: 'Can we make these things last one more year?'" says Dave Lucas, Sherburne County's solid waste administrator. However, hopes for a new set of boilers were revived in April after the

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Tiny Glass Bubbles With Big Potential | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Tiny Glass Bubbles With Big Potential Tiny Glass Bubbles With Big Potential Tiny Glass Bubbles With Big Potential August 19, 2011 - 12:32pm Addthis SRNL's Porous Walled Hollow Glass Microspheres (which are about half the width of a human hair in diameter) have a network of interconnected pores that enable them to be filled with, hold and release gases and other materials. | Image courtesy of SRNL SRNL's Porous Walled Hollow Glass Microspheres (which are about half the width of a human hair in diameter) have a network of interconnected pores that enable them to be filled with, hold and release gases and other materials. | Image courtesy of SRNL Liisa O'Neill Liisa O'Neill Former New Media Specialist, Office of Public Affairs What are the key facts? SRNL's porous walled glass microspheres allow the potential for

222

Going Big: Building the Largest Ever Energy Efficiency Project | Department  

Broader source: Energy.gov (indexed) [DOE]

Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project Going Big: Building the Largest Ever Energy Efficiency Project August 16, 2012 - 2:19pm Addthis New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to serve 8,000 Northwest homes. Construction of the chip pretreatment structure, shown here, is scheduled to be completed in 2013. | Photo courtesy of Bonneville Power Administration. New screening equipment used to refine wood chips at the North Pacific Paper Corporation paper mill in Longview, Wash., is expected to save NORPAC 100 million kilowatt hours of electricity a year, which is enough energy to

223

Cutting-Edge Building Technologies Offer Big Energy Savings Potential |  

Broader source: Energy.gov (indexed) [DOE]

Cutting-Edge Building Technologies Offer Big Energy Savings Cutting-Edge Building Technologies Offer Big Energy Savings Potential Cutting-Edge Building Technologies Offer Big Energy Savings Potential November 5, 2013 - 3:36pm Addthis The Building Technologies Office’s Emerging Technologies Program works to advance new commerical building technologies that are expected to reach the marketplace in five years or less. | Photo of National Renewable Energy Laboratory's Research Support Facility by Dennis Schroeder, National Renewable Energy Laboratory The Building Technologies Office's Emerging Technologies Program works to advance new commerical building technologies that are expected to reach the marketplace in five years or less. | Photo of National Renewable Energy Laboratory's Research Support Facility by Dennis Schroeder, National

224

Big Spring I Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Big Spring I Wind Farm Big Spring I Wind Farm Facility Big Spring I Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer York Research Energy Purchaser TXU Electric & Gas Location Howard County TX Coordinates 32.146715°, -101.398244° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.146715,"lon":-101.398244,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

225

Pre-Big Bang, vacuum and noncyclic cosmologies  

E-Print Network [OSTI]

WMAP and Planck open the way to unprecedented Big Bang phenomenology, potentially allowing to test the standard Big Bang model as well as less conventional approaches including noncyclic pre-Big Bang cosmologies that would incorporate a new fundamental scale beyond the Planck scale and, possibly, new ultimate constituents of matter. Alternatives to standard physics can be considered from a cosmological point of view concerning vacuum structure, the nature of space-time, the origin and evolution of our Universe, the validity of quantum field theory and conventional symmetries, solutions to the cosmological constant problem, inflationary scenarios, dark matter and dark energy, the interpretation of string-like theories... Lorentz-like symmetries for the properties of matter (standard or superbradyonic) can then be naturally stable space-time configurations resulting from general cosmological scenarios that incorporate physics beyond the Planck scale and describe the formation and evolution of the present vacuum...

Gonzalez-Mestres, Luis

2012-01-01T23:59:59.000Z

226

New Boilers, Big Savings for Minnesota County | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Boilers, Big Savings for Minnesota County Boilers, Big Savings for Minnesota County New Boilers, Big Savings for Minnesota County August 25, 2010 - 12:00pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Officials at Sherburne County's Government Center in Minnesota had a problem: the complex's original boilers, installed in 1972, were in desperate need of replacing. The two boilers were inefficient, labor intensive and well past their life expectancy. Any upgrades to the system were put on hold as the county tightened its purse strings amid a tough economy. "We kept asking: 'Can we make these things last one more year?'" says Dave Lucas, Sherburne County's solid waste administrator. However, hopes for a new set of boilers were revived in April after the

227

Natural Gas for the Long Haul (Big Rigs Go Green)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Long Haul (Big Rigs Go Green) the Long Haul (Big Rigs Go Green) JOHN DAVIS: No one has been hit harder by rising fuel prices than America's long-haul commercial truckers. A big rig can easily burn 20,000 gallons of fuel a year, and with diesel prices projected to keep rising, this not only pinches the trucker's bottom line, but that extra cost is passed on to American consumers. Meanwhile, natural gas prices have remained stable and are forecast to stay that way for years to come. Up to now, demand for natural gas as a transportation fuel has been mostly for compressed natural gas used by light and medium-duty vehicles. City buses, refuse haulers, utilities, and

228

Solar Power Generates Big Savings in Salinas, California | Department of  

Broader source: Energy.gov (indexed) [DOE]

Power Generates Big Savings in Salinas, California Power Generates Big Savings in Salinas, California Solar Power Generates Big Savings in Salinas, California October 15, 2012 - 4:40pm Addthis A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County’s Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs. Click here to see a panoramic view of the entire solar array. | Photo courtesy of Santa Cruz Westside Electric, DBA Sandbar. A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County's Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs.

229

Solar Power Generates Big Savings in Salinas, California | Department of  

Broader source: Energy.gov (indexed) [DOE]

Solar Power Generates Big Savings in Salinas, California Solar Power Generates Big Savings in Salinas, California Solar Power Generates Big Savings in Salinas, California October 15, 2012 - 4:40pm Addthis A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County’s Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs. Click here to see a panoramic view of the entire solar array. | Photo courtesy of Santa Cruz Westside Electric, DBA Sandbar. A portion of the new 141 kilowatt solar photovoltaic energy system at Monterey County's Laurel Yard Complex in Salinas, California. The system is expected to save the county thousands of dollars a year in energy costs.

230

National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

231

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

232

Microsoft Word - NEPA Big Sky Final EA .doc  

Broader source: Energy.gov (indexed) [DOE]

886 886 FINAL ENVIRONMENTAL ASSESSMENT For The Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY April 2013 U.S. Department of Energy Kevin Dome Carbon Storage Project National Energy Technology Laboratory Final Environmental Assessment i April 2013 COVER SHEET Responsible Agency: The U.S. Department of Energy (DOE) Title: Environmental Assessment for the Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project (DOE/EA-1886) Contact: For additional copies or more information about this Environmental Assessment, please contact: Mr. Bill Gwilliam U.S. Department of Energy

233

Dynamic Transmission Electron Microscopy  

SciTech Connect (OSTI)

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

234

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

235

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

236

Transmission Reliability | Department of Energy  

Energy Savers [EERE]

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

237

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

238

Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (DOE/EIS-0183)(10/19/01)  

Broader source: Energy.gov (indexed) [DOE]

for the for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. The West Coast is experiencing a shortfall in electric energy supply, as well as a volatile wholesale power market in which prices have reached record highs. The Project is one of

239

Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6: May 29, 2006 6: May 29, 2006 The Big Picture on Gasoline Prices to someone by E-mail Share Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on Gasoline Prices on Facebook Tweet about Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on Gasoline Prices on Twitter Bookmark Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on Gasoline Prices on Google Bookmark Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on Gasoline Prices on Delicious Rank Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on Gasoline Prices on Digg Find More places to share Vehicle Technologies Office: Fact #426: May 29, 2006 The Big Picture on Gasoline Prices on AddThis.com... Fact #426: May 29, 2006 The Big Picture on Gasoline Prices

240

T-677: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of...  

Broader source: Energy.gov (indexed) [DOE]

77: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of Service Vulnerability T-677: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of Service Vulnerability July 27, 2011 -...

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

E-Print Network 3.0 - aura laser big Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

laser big Search Powered by Explorit Topic List Advanced Search Sample search results for: aura laser big Page: << < 1 2 3 4 5 > >> 1 Aura as a Platform for Distributed Sensing and...

242

Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

243

Multiple Tenure/Tenure-Track Faculty Positions Software Engineering Focus: CyberSecurity and Big Data  

E-Print Network [OSTI]

Multiple Tenure/Tenure-Track Faculty Positions Software Engineering Focus: CyberSecurity and Big to cybersecurity and big data. Outstanding candidates from all areas of software engineering and computer science

Carver, Jeffrey C.

244

Geothermal Brine Brings Low-Cost Power with Big Potential | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Geothermal Brine Brings Low-Cost Power with Big Potential Geothermal Brine Brings Low-Cost Power with Big Potential January 3, 2014 - 9:05am Addthis John Fox, CEO of Electratherm,...

245

Taking Battery Technology from the Lab to the Big City | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Taking Battery Technology from the Lab to the Big City Taking Battery Technology from the Lab to the Big City Addthis Duration 2:08 Topic Smart Grid Storage...

246

Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction,  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

County Fleet Goes Big County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency to someone by E-mail Share Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency on Facebook Tweet about Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency on Twitter Bookmark Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency on Google Bookmark Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency on Delicious Rank Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency on Digg Find More places to share Alternative Fuels Data Center: County Fleet Goes Big on Idle Reduction, Ethanol Use, Fuel Efficiency on

247

Chapter 4 Transmission Adequacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

248

Riparian wetlands and visitor use management in Big Bend National Park, Texas'  

E-Print Network [OSTI]

to the Mexican States of Chihuahua and Coahuila. Big Bend National Park contains about 27,000 acres of wetland

249

John C. Mather, the Big Bang, and the COBE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

John C. Mather, the Big Bang, and the COBE John C. Mather, the Big Bang, and the COBE Resources with Additional Information · Videos John C. Mather Courtesy of NASA "Dr. John C. Mather of NASA's Goddard Space Flight Center has won the 2006 Nobel Prize for Physics, awarded by the Royal Swedish Academy of Sciences. Mather shares the prize with George F. Smoot of the University of California for their collaborative work on understanding the Big Bang. Mather and Smoot analyzed data from NASA's Cosmic Background Explorer (COBE), which studied the pattern of radiation from the first few instants after the universe was formed. In 1992, the COBE team announced that they had mapped the primordial hot and cold spots in the cosmic microwave background radiation. These spots are related to the gravitational field in the early universe, only instants after the Big Bang, and are the seeds for the giant clusters of galaxies that stretch hundreds of millions of light years across the universe. ...

250

SHADING CALCULATIONS FOR THE BIG DISH Jeff Cumpston1  

E-Print Network [OSTI]

as that of the Model Power Plant in Albuquerque, USA. Staggering of dish rows is simulated and it is found], building the 'SG4' 500m2 Big Dish solar paraboloidal concentrator for solar-thermal to electric energy into a dish-array for large-scale power production. A program has been created for modelling the annual

251

People's Physics Book Ch 20-1 The Big Ideas  

E-Print Network [OSTI]

(whether standing still or moving at a fast speed) is WRONG. In fact, the rate at which time passes dependsPeople's Physics Book Ch 20-1 The Big Ideas Einstein believed that the laws of physics do of physics. In other words, if you are on a moving train and drop a ball or if you are standing on a farm

California at Santa Cruz, University of

252

How Big Is the World Wide Web? Adrian Dobra  

E-Print Network [OSTI]

How Big Is the World Wide Web? Adrian Dobra Department of Statistics Carnegie Mellon University of sound proce­ dures for assessing the size of the World Wide Web. The problem is compounded by the fact that sampling directly from the Web is not possible. Several groups of re­ searchers have found sampling schemes

253

People's Physics Book Ch 7-1 The Big Idea  

E-Print Network [OSTI]

People's Physics Book Ch 7-1 The Big Idea The universe has many remarkable qualities, among them. This is the second of the five fundamental conservation laws in physics. The other four are conservation of energy;People's Physics Book Ch 7-2 as just the two cars. In this case, internal forces include

California at Santa Cruz, University of

254

Small Towns Achieve Big Savings with Lighting Upgrades  

Broader source: Energy.gov [DOE]

Small communities in Kansas and Missouri are saving big money and energy through high-impact lighting projects. Over the past three years, more than 5,700 energy-efficient lights were installed in communities with populations of less than 35,000 people, saving a combined $25 million in energy costs and drastically cutting carbon emissions.

255

UNIVERSITY OF NOTTINGHAM, 2006 Big Issues in Mobile  

E-Print Network [OSTI]

© UNIVERSITY OF NOTTINGHAM, 2006 Big Issues in Mobile Learning Report of a workshop by the Kaleidoscope Network of Excellence Mobile Learning Initiative Edited by Mike Sharples #12;Contents Foreword 2 Introduction: Mapping the Landscape of Mobile Learning 3 What is mobile learning? 5 How to enhance

Paris-Sud XI, Université de

256

People's Physics Book Ch13-1 The Big Ideas  

E-Print Network [OSTI]

electrical energy into heat and light or an electric motor that converts electric energy into mechanicalPeople's Physics Book Ch13-1 The Big Ideas: The name electric current is given to the phenomenon that occurs when an electric field moves down a wire at close to the speed of light. Voltage is the electrical

California at Santa Cruz, University of

257

System of Systems and Big Data analytics - Bridging the gap  

Science Journals Connector (OSTI)

Large data has been accumulating in all aspects of our lives for quite some time. Advances in sensor technology, the Internet, wireless communication, and inexpensive memory have all contributed to an explosion of ''Big Data''. System of Systems (SoS) ...

Barnabas K. Tannahill; Mo Jamshidi

2014-01-01T23:59:59.000Z

258

Big-hole drilling - the state of the art  

SciTech Connect (OSTI)

The art of big-hole drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being drilled by the rotary-drilling process, but almost all the hardware and systems have undergone many changes during the intervening years. The current design of bits, cutters, and other big-hole-drilling hardware results from contributions of manufacturers and Test Site personnel. The dual-string, air-lift, reverse-circulation system was developed at the Test Site. Necessity was really the Mother of this invention, but this circulation system is worthy of consideration under almost any condition. Drill rigs for big-hole drilling are usually adaptations of large oil-well drill rigs with minor modifications required to handle the big bits and drilling assemblies. Steel remains the favorite shaft lining material, but a lot of thought is being given to concrete linings, especially precast concrete.

Lackey, M.D.

1983-01-01T23:59:59.000Z

259

Hydroliquefaction of Big Brown lignite in supercritical fluids  

E-Print Network [OSTI]

Big Brown lignite was liquefied in a fixed bed tube reactor. Three solvents were used in the liquefaction studies, toluene, cyclohexane and methanol. Two co-solvents, tetralin and water were used with toluene. The effects of the solvents and co...

Chen, Hui

2012-06-07T23:59:59.000Z

260

The little sibling of the big rip singularity  

E-Print Network [OSTI]

We present a new cosmological event, which we named the little sibling of the big rip. This event is much smoother than the big rip singularity. When the little sibling of the big rip is reached, the Hubble rate and the scale factor blow up but the cosmic derivative of the Hubble rate does not. This abrupt event takes place at an infinite cosmic time where the scalar curvature explodes. We show that a doomsday \\'a la little sibling of the big rip is compatible with an accelerating universe, indeed at present it would mimic perfectly a LCDM scenario. It turns out that eventhough the event seems to be harmless as it takes place in the infinite future, the bound structures in the universe would be unavoidably destroyed on a finite cosmic time from now. The model can be motivated by considering that the weak energy condition should not be abusibely violated in our Universe, and it could give us some hints about the status of recently formulated nonlinear energy conditions.

Bouhmadi-Lopez, Mariam; Martin-Moruno, Prado; Ouali, Taoufik; Tavakoli, Yaser

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The little sibling of the big rip singularity  

E-Print Network [OSTI]

We present a new cosmological event, which we named the little sibling of the big rip. This event is much smoother than the big rip singularity. When the little sibling of the big rip is reached, the Hubble rate and the scale factor blow up but the cosmic derivative of the Hubble rate does not. This abrupt event takes place at an infinite cosmic time where the scalar curvature explodes. We show that a doomsday \\'a la little sibling of the big rip is compatible with an accelerating universe, indeed at present it would mimic perfectly a LCDM scenario. It turns out that eventhough the event seems to be harmless as it takes place in the infinite future, the bound structures in the universe would be unavoidably destroyed on a finite cosmic time from now. The model can be motivated by considering that the weak energy condition should not be abusibely violated in our Universe, and it could give us some hints about the status of recently formulated nonlinear energy conditions.

Mariam Bouhmadi-Lopez; Ahmed Errahmani; Prado Martin-Moruno; Taoufik Ouali; Yaser Tavakoli

2014-07-09T23:59:59.000Z

262

Walkable Communities, Inc. March 1999 Fixing the Big  

E-Print Network [OSTI]

-1- © Walkable Communities, Inc. March 1999 Road Diets Fixing the Big Roads By Dan Burden and Peter fund a study and to convert a one-mile section of Electric Avenue in Lewistown, Pennsylvania, from four crash statistics and other data, the team concluded that more uniform flow, reduced conflicts and great

Handy, Susan L.

263

Big Bayou Creek and Little Bayou Creek Watershed Monitoring Program  

SciTech Connect (OSTI)

Biological monitoring of Little Bayou and Big Bayou creeks, which border the Paducah Site, has been conducted since 1987. Biological monitoring was conducted by University of Kentucky from 1987 to 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 through March 1999. In March 1998, renewed Kentucky Pollutant Discharge Elimination System (KPDES) permits were issued to the US Department of Energy (DOE) and US Enrichment Corporation. The renewed DOE permit requires that a watershed monitoring program be developed for the Paducah Site within 90 days of the effective date of the renewed permit. This plan outlines the sampling and analysis that will be conducted for the watershed monitoring program. The objectives of the watershed monitoring are to (1) determine whether discharges from the Paducah Site and the Solid Waste Management Units (SWMUs) associated with the Paducah Site are adversely affecting instream fauna, (2) assess the ecological health of Little Bayou and Big Bayou creeks, (3) assess the degree to which abatement actions ecologically benefit Big Bayou Creek and Little Bayou Creek, (4) provide guidance for remediation, (5) provide an evaluation of changes in potential human health concerns, and (6) provide data which could be used to assess the impact of inadvertent spills or fish kill. According to the cleanup will result in these watersheds [Big Bayou and Little Bayou creeks] achieving compliance with the applicable water quality criteria.

Kszos, L.A.; Peterson, M.J.; Ryon; Smith, J.G.

1999-03-01T23:59:59.000Z

264

How to use Big Data technologies to optimize operations in Upstream Petroleum Industry  

E-Print Network [OSTI]

How to use Big Data technologies to optimize operations in Upstream Petroleum Industry Abdelkader generated by the Petroleum Industry and particularly its upstream segment? Upstream is no stranger to Big the desired outcomes? Keywords Big Data; Analytics; Upstream Petroleum Industry; Knowledge Management; KM

Paris-Sud XI, Université de

265

Scalable Multi-Access Flash Store for Big Data Analytics Sang-Woo Jun  

E-Print Network [OSTI]

Scalable Multi-Access Flash Store for Big Data Analytics Sang-Woo Jun , Ming Liu , Kermin Elliott General Terms Design Measurement Performance Keywords Storage system, Big Data, FPGA networks, SSD, Flash We have entered the "Big Data" age. The evolution of computer networks and the increasing scale

Bhatia, Sangeeta

266

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

267

Hydrogen Transmission and Distribution Workshop  

Broader source: Energy.gov [DOE]

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

268

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

269

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

270

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

271

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

272

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Broader source: Energy.gov [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

273

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

274

SunShot Initiative: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

275

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

276

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

277

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

278

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

279

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

280

National Electric Transmission Congestion Studies  

Broader source: Energy.gov [DOE]

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

National Transmission Grid Study: 2002  

Broader source: Energy.gov [DOE]

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

282

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

283

Sequoia tops Graph 500 list of 'big data' supercomputers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ATL062113_graph ATL062113_graph 06/21/2013 The Livermore Lab's Sequoia supercomputer topped the biannual Graph 500 list of the world's fastest systems for "big data" this week. The Graph 500 benchmark measures the speed with which a supercomputer can "connect the dots" within a massive set of data. Sequoia traversed 15,363 connections per second. Sequoia tops Graph 500 list of 'big data' supercomputers Donald B Johnston, LLNL, (925) 423-4902, johnston19@llnl.gov LLNL's 20 petaflops Sequoia supercomputer has retained its No. 1 ranking on the Graph 500 list, a measure of a system's ability to conduct analytic calculations -- finding the proverbial needle in the haystack. An IBM Blue Gene Q system, Sequoia was able to traverse 15,363 giga edges per second on a scale of 40 graph (a graph with 2^40 vertices). The new

284

NREL: News Feature - Small Improvements to Make Big Difference  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Small Improvements to Make Big Difference Small Improvements to Make Big Difference January 26, 2011 Photo rendering of the fully built Research Support Facility. Enlarge image This artist's rendering shows how the Research Support Facility will look once the ARRA funded expansion project is complete at the end of 2011. Courtesy of RNL Old memo from the boss: Your goal for 2010 - build one of the most energy efficient office buildings in the world on the campus of the U.S. Department of Energy's National Renewable Energy Laboratory (NREL). New memo from the boss: Your goal for 2011 - repeat 2010 goal and increase energy efficiency by 17 percent. Fortunately for NREL, these goals are being achieved thanks to $39 million in funding for the new RSF wing from the 2009 American Recovery and Reinvestment Act (ARRA). The ARRA funding allowed a planned 138,000 square

285

NREL: News Feature - NREL Thinks Big at Wind Technology Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Thinks Big at Wind Technology Center Thinks Big at Wind Technology Center March 22, 2012 An aerial photograph of the National Wind Technology Center site shows three large wind turbines with other smaller wind turbines in the background. Mountains are in the background of the photo behind the site. Enlarge image The most noticeable change at the NWTC in recent years is the addition of multi-megawatt wind turbines used for a wide variety of R&D activities in collaboration with industry partners. Credit: Dennis Schroeder The Front Range environment at the National Wind Technology Center (NWTC) is harsh. The winds - the very reason the NWTC is there - have little mercy. The frigid cold of winter gives way to the baking sun of summer. Yet in the midst of this difficult landscape, the future of wind energy grows

286

Big Smile Wind Farm (Dempsey Ridge) | Open Energy Information  

Open Energy Info (EERE)

Smile Wind Farm (Dempsey Ridge) Smile Wind Farm (Dempsey Ridge) Jump to: navigation, search Name Big Smile Wind Farm (Dempsey Ridge) Facility Big Smile Wind Farm (Dempsey Ridge) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Acciona Developer Acciona Location Roger Mills County OK Coordinates 35.508363°, -99.739494° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.508363,"lon":-99.739494,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

287

Big Wind Power Project (Lanai) | Open Energy Information  

Open Energy Info (EERE)

Project (Lanai) Project (Lanai) Jump to: navigation, search Name Big Wind Power Project (Lanai) Facility Big Wind Power Project (Lanai) Sector Wind energy Facility Type Commercial Scale Wind Facility Status Proposed Location Lanai Island HI Coordinates 20.828844°, -156.928825° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":20.828844,"lon":-156.928825,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

288

Big Stone County, Minnesota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Big Stone County, Minnesota: Energy Resources Big Stone County, Minnesota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 45.4932045°, -96.4724° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.4932045,"lon":-96.4724,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

289

Big data for ecologists: Highlighting the ORNL DAAC  

SciTech Connect (OSTI)

Ecologists are increasingly confronted by questions that can be addressed only by integrating data from numerous sources, often across large geographic areas and broad time periods. The supply of ecological big data is increasing at a rapid pace as researchers are publishing their data sets and large, public science and data infrastructures (such as NEON, DataONE, LTER, & NCEAS) are producing and curating extensive volumes of complex data and metadata. While supply of, and demand for, ecological data is on the rise, many ecologists now face a new challenge in locating and synthesizing the data relevant for their particular question. Here we highlight selected popular big data products applicable to ecological research available from the NASA Distributed Active Archive Center (DAAC) located at Oak Ridge National Laboratory (ORNL).

Boyer, Alison G [ORNL] [ORNL; Cook, Robert B [ORNL] [ORNL; Devarakonda, Ranjeet [ORNL] [ORNL; Eby, Pete I [ORNL] [ORNL; Thornton, Michele M [ORNL] [ORNL; Thornton, Peter E [ORNL] [ORNL; SanthanaVannan, Suresh K [ORNL] [ORNL; Virdi, Makhan L [ORNL] [ORNL; Wei, Yaxing [ORNL] [ORNL

2014-01-01T23:59:59.000Z

290

Post Big Bang Processing of the Primordial Elements  

E-Print Network [OSTI]

We explore the Gnedin-Ostriker suggestion that a post-Big-Bang photodissociation process may modify the primordial abundances of the light elements. We consider several specific models and discuss the general features that are necessary (but not necessarily sufficient) to make the model work. We find that with any significant processing, the final D and $^3$He abundances, which are independent of their initial standard big bang nucleosynthesis (SBBN) values, rise quickly to a level several orders of magnitude above the observationally inferred primordial values. Solutions for specific models show that the only initial abundances that can be photoprocessed into agreement with observations are those that undergo virtually no processing and are already in agreement with observation. Thus it is unlikely that this model can work for any non-trivial case unless an artificial density and/or photon distribution is invoked.

M. J. Balbes; R. N. Boyd; G. Steigman; D. Thomas

1995-05-12T23:59:59.000Z

291

Fault Detection, Diagnostics and Optimmization using BIG Data Analytics  

E-Print Network [OSTI]

111, Duke Street, Suite 3800 Montreal (Quebec) H3C 2M1 CANADA Tel : +1-514-866-5159 Fax : +1-514-866-2047 Fault Detection, diagnostics and optimization using BIG data analytics Presenter: IFCS Inc., Quebec, CANADA The past decade has seen... Joule AnalytiX management framework Unified Collector ? Syslog Events/SNMP ? Diagnostic Agent for Building Operations ? Performance Data ? System Health Data ? Feedback from BMS ? Johnson Controls ? Delta Controls ? Trane ? Siemens...

Bonifay, X.

2013-01-01T23:59:59.000Z

292

Supernova bangs as a tool to study big bang  

SciTech Connect (OSTI)

Supernovae and gamma-ray bursts are the most powerful explosions in observed Universe. This educational review tells about supernovae and their applications in cosmology. It is explained how to understand the production of light in the most luminous events with minimum required energy of explosion. These most luminous phenomena can serve as primary cosmological distance indicators. Comparing the observed distance dependence on red shift with theoretical models one can extract information on evolution of the Universe from Big Bang until our epoch.

Blinnikov, S. I., E-mail: Sergei.Blinnikov@itep.ru [Institute for Theoretical and Experimental Physics (Russian Federation)

2012-09-15T23:59:59.000Z

293

The game and furbearing mammals of Big Thicket National Preserve  

E-Print Network [OSTI]

from squirrel census indicated the most stable populations existed in the mature forest of the Big Sandy Unit. Although fall populations in Beech Creek Unit were higher than other units, an open hunting season harvested 27% of the estimated..., including the rising and falling of the Gulf of Mexico. the major topographic features, such as the stream terraces bordering the floodplains of the Neches, Sabine, and Trinity rivers, were formed. In addition, during the periods of glaciation...

Norton, William Glenn

2012-06-07T23:59:59.000Z

294

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

295

Big Bend Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Big Bend Hot Springs Geothermal Area Big Bend Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Big Bend Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0217,"lon":-121.9183,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

296

Big Windy Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Big Windy Hot Springs Geothermal Area Big Windy Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Big Windy Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":65.2292,"lon":-144.4986,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

297

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

298

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Broader source: Energy.gov (indexed) [DOE]

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

299

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

300

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

302

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

303

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

304

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

305

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

306

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

307

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

308

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

309

Agenda: Electricity Transmission and Distribution - East | Department...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

310

Agenda: Electricity Transmission, Storage and Distribution -...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

311

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

312

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

313

Big-Data RHEED analysis for understanding epitaxial film growth processes  

SciTech Connect (OSTI)

Reflection high energy electron diffraction (RHEED) has by now become a standard tool for in-situ monitoring of film growth by pulsed laser deposition and molecular beam epitaxy. Yet despite the widespread adoption and wealth of information in RHEED image, most applications are limited to observing intensity oscillations of the specular spot, and much additional information on growth is discarded. With ease of data acquisition and increased computation speeds, statistical methods to rapidly mine the dataset are now feasible. Here, we develop such an approach to the analysis of the fundamental growth processes through multivariate statistical analysis of RHEED image sequence. This approach is illustrated for growth of LaxCa1-xMnO3 films grown on etched (001) SrTiO3 substrates, but is universal. The multivariate methods including principal component analysis and k-means clustering provide insight into the relevant behaviors, the timing and nature of a disordered to ordered growth change, and highlight statistically significant patterns. Fourier analysis yields the harmonic components of the signal and allows separation of the relevant components and baselines, isolating the assymetric nature of the step density function and the transmission spots from the imperfect layer-by-layer (LBL) growth. These studies show the promise of big data approaches to obtaining more insight into film properties during and after epitaxial film growth. Furthermore, these studies open the pathway to use forward prediction methods to potentially allow significantly more control over growth process and hence final film quality.

Vasudevan, Rama K [ORNL; Tselev, Alexander [ORNL; Baddorf, Arthur P [ORNL; Kalinin, Sergei V [ORNL

2014-01-01T23:59:59.000Z

314

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Broader source: Energy.gov (indexed) [DOE]

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

315

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

316

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

317

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

318

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

319

New Blog Seeks Out the "Next Big Thing" | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Money This image shows the barred spiral galaxy NGC 1398. | Image courtesy of the Dark Energy Survey. Supercomputing: A Toolbox to Simulate the Big Bang and Beyond...

320

Benchmarking and Equipment and Controls Assessment for a 'Big Box' Retail Chain  

E-Print Network [OSTI]

Assessment for a ‘Big Box’ Retail Chain Philip Haves andperformance of existing and new retail stores belonging to aenergy performance of retail stores of relatively standard

Haves, Philip

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Argonne OutLoud: "Computation, Big Data, and the Future of Cities...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OutLoud: "Computation, Big Data, and the Future of Cities" Share Browse By - Any - Energy -Energy efficiency --Vehicles ---Alternative fuels ---Automotive engineering ---Diesel...

322

E-Print Network 3.0 - af low-tar big Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: steam or air for feeding into the respective reactors as the gasification medium. The big advantage with using... that the pyrolysis products flow co-currently through...

323

MagLab Feature Stories: Big Bend Teachers Tackle Pioneering Science...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Big Bend interns came from Leon Countys Deerlake Middle and Astoria Park Elementary schools and the Challenger Center; Gadsden Countys Shanks Middle School; and...

324

Data, Feedback, & Awareness Lead to Big Energy Savings  

Broader source: Energy.gov (indexed) [DOE]

monthly energy feedback and monthly energy feedback and "staff monitors" to reinforce commu- nication and activity led to improved routine practices and significant energy savings. Members of the Navy Region Southwest Metro San Diego regional energy management team with an example poster from their energy awareness program. (Photo courtesy FEMP/NRSMSD.) Data, Feedback, & Awareness Lead to Big Energy Savings The Navy Region Southwest Metro San Diego Area (NRSMSD) regional energy management team achieved significant energy savings at the three major complexes: Naval Base Coronado, Naval Base San Diego, and Naval Base Point Loma, result- ing largely from a well organized energy awareness program centered on energy data

325

Data, Feedback, & Awareness Lead to Big Energy Savings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

energy feedback and energy feedback and "staff monitors" to reinforce commu- nication and activity led to improved routine practices and significant energy savings. Members of the Navy Region Southwest Metro San Diego regional energy management team with an example poster from their energy awareness program. (Photo courtesy FEMP/NRSMSD.) Data, Feedback, & Awareness Lead to Big Energy Savings The Navy Region Southwest Metro San Diego Area (NRSMSD) regional energy management team achieved significant energy savings at the three major complexes: Naval Base Coronado, Naval Base San Diego, and Naval Base Point Loma, result- ing largely from a well organized energy awareness program centered on energy data

326

Big Thicket National Preserve: Trails to the Future  

E-Print Network [OSTI]

of the Addition Act did not immediately transfer ownership of the land from timber companies to the National Park Service. Funds still had to be allocated to purchase the land. Completing the acquisition of these lands will cost an estimated $15 to $20... worked closely with an energy company in the region and had plans to apply for non-profit status. However, efforts began to slip and finally failed as funding decreased. Other efforts at improving the economic development in the Big Thicket region have...

Anderson, Luke; Allen, Chris; Elrod, Leah; Forbes, Melissa; Harbin, Hannah; Stromm, Diann

2003-01-01T23:59:59.000Z

327

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

328

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

329

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

330

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

331

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

332

Big China Solar Energy Group | Open Energy Information  

Open Energy Info (EERE)

China Solar Energy Group China Solar Energy Group Jump to: navigation, search Logo: Big China Solar Energy Group Name Big China Solar Energy Group Address 8-306, Dingtaifenghua Community,Qianhai Road, Nanshan District Place Guangdong, China Sector Solar Product Solar Energy Products Phone number 0086-0755-86172740 Website http://www.bigchinasolar.cn/ Coordinates 22.532988°, 113.930436° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":22.532988,"lon":113.930436,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

333

Big Sky Carbon Sequestration Partnership | Open Energy Information  

Open Energy Info (EERE)

Sky Carbon Sequestration Partnership Sky Carbon Sequestration Partnership Jump to: navigation, search Logo: Big Sky Carbon Sequestration Partnership Name Big Sky Carbon Sequestration Partnership Address 2327 University Way, 3rd Floor Place Bozeman, Montana Zip 59715 Region Pacific Northwest Area Phone number 406-994-3755 Notes One of the US DOE's seven regional carbon sequestration partnerships. Coordinates 45.6565752°, -111.041813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.6565752,"lon":-111.041813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

334

Surface reclamation of the Big Lake oil field  

SciTech Connect (OSTI)

Since the discovery of 1 Santa Rita in 1923, millions of barrels of salt water have been produced along with 135 million bbl of oil from the Big Lake oil field in Reagan County, Texas. Until the early 1960s, the accepted disposal method for the produced water was surface discharge to a large evaporation pond north of the field. Produced water was allowed to flow from wells to the pond via natural topographic drainage. This practice resulted in 2000 ac of eroded, barren landscape, characterized by highly saline soils incapable of supporting vegetation. In 1989, the University of Texas System, the U.S. Soil Conservation Service, and Marathon Oil Company, which acquired Big Lake field in 1962, initiated an experimental project to reclaim the affected land and restore rangeland productivity. An underground drainage system, consisting of 125,000 ft of buried drainage conduit and eight collection sumps, was installed over 205 ac of the affected area. Earthen terraces were constructed to capture and hold rain water to facilitate downward percolation and leaching of salts from the soil profile. Salts leached from the soil are captured by the drainage system and pumped to injection wells for disposal. The excellent revegetation that has occurred over the test area after three years of operations is encouraging and has shown the need for expanding and enhancing the existing system with supplemental water from fresh water wells, application of soil-amending agents, additional terracing, and selective planting with salt-tolerant species.

Weathers, M.L. (Univ. of Texas Lands, Midland, TX (United States)); Moore, K.R. (Univ. of Texas Lands, Big Lake, TX (United States)); Ford, D.L. (U.S.D.A. Soil Conservation Service, San Angelo, TX (United States)); Curlee, C.K. (Marathon Oil Company, Midland, TX (United States))

1994-03-01T23:59:59.000Z

335

Big Horn Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

Wind Power Project Wind Power Project Jump to: navigation, search Name Big Horn Wind Power Project Facility Big Horn Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer PPM Energy Inc Energy Purchaser Modesto-Santa Clara-Redding Public Power Agency Location Klickitat County WA Coordinates 45.935948°, -120.284085° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.935948,"lon":-120.284085,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

336

T-677: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of Service  

Broader source: Energy.gov (indexed) [DOE]

7: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of 7: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of Service Vulnerability T-677: F5 BIG-IP BIND Negative Caching RRSIG RRsets Denial of Service Vulnerability July 27, 2011 - 3:58pm Addthis PROBLEM: F5 has acknowledged a vulnerability in BIG-IP, which can be exploited by malicious people to cause a DoS (Denial of Service). PLATFORM: The vulnerability is reported in the following products and versions: BIG-IP LTM versions 9.0.0 through 9.4.8, 10.0.0 through 10.1.0, and 10.2.0 through 10.2.2 BIG-IP GTM versions 9.0.0 through 9.4.8, 10.0.0 through 10.1.0, and 10.2.0 through 10.2.2 BIG-IP ASM versions 9.0.0 through 9.4.8, 10.0.0 through 10.1.0, and 10.2.0 through 10.2.2 BIG-IP Link Controller versions 9.0.0 through 9.4.8, 10.0.0 through 10.1.0, and 10.2.0 through 10.2.2

337

How to use Big Data technologies to optimize operations in Upstream Petroleum Industry  

E-Print Network [OSTI]

How to use Big Data technologies to optimize operations in Upstream Petroleum Industry Abdelkader for it to have value. But what about Big Data generated by the Petroleum Industry and particularly its upstream; Analytics; Upstream Petroleum Industry; Knowledge Management; KM; Business Intelligence; BI; Innovation

Boyer, Edmond

338

The Local Seeing Environment at Big Bear Solar Observatory Angelo Verdoni and Carsten Denker1  

E-Print Network [OSTI]

­ Big Bear Solar Observatory (BBSO) in California, Mees Solar Observatory (MSO) on Haleakal¯a, MauiThe Local Seeing Environment at Big Bear Solar Observatory Angelo Verdoni and Carsten Denker1 New Jersey Institute of Technology, Center for Solar-Terrestrial Research, 323 Martin Luther King Blvd

339

HoustonChronicle.com -Tiny honor a big deal for algae scientist HoustonChronicle.  

E-Print Network [OSTI]

HoustonChronicle.com - Tiny honor a big deal for algae scientist HoustonChronicle. com Section-mail this story June 18, 2005, 5:48PM Tiny honor a big deal for algae scientist By DAVID A. FAHRENTHOLD Washington Post Sometimes, algae can be the highest form of flattery. ADVERTISEMENTSo it was for Diane K. Stoecker

Jeong, Hae Jin

340

Methanogenesis in Big Soda Lake, Nevada: an Alkaline, Moderately Hypersaline Desert Lake  

Science Journals Connector (OSTI)

...Methanogenesis in Big Soda Lake, Nevada: an Alkaline, Moderately...slurries from Big Soda Lake, Nevada, produced significant...MATERIALS AND METHODS Site description and sampling...is located in eastern Nevada near Fallon (-350 miles...injected into a sterile test tube (18 x 150 mm; Bellco...

Ronald S. Oremland; Lorraine Marsh; David J. DesMarais

1982-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Could rats really grow as big as sheep?1 By Katy Marriott2  

E-Print Network [OSTI]

Could rats really grow as big as sheep?1 By Katy Marriott2 3 You've been following the news this week, you may have heard that sheep-sized rats will soon be rampaging through our4 towns and cities. Yes, that's right. Rats. As big as sheep.5 6 Or at least, that's what some of the papers would have

South Bohemia, University of

342

Data Warehousing in the Age of Big Data, 1st edition  

Science Journals Connector (OSTI)

Data Warehousing in the Age of the Big Data will help you and your organization make the most of unstructured data with your existing data warehouse. As Big Data continues to revolutionize how we use data, it doesn't have to create more confusion. ...

Krish Krishnan

2013-05-01T23:59:59.000Z

343

NREL: Transmission Grid Integration - Webinars  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

344

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

345

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

346

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

347

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

348

Big Data Frequent Pattern Mining David C. Anastasiu and Jeremy Iverson and Shaden Smith and George Karypis  

E-Print Network [OSTI]

Big Data Frequent Pattern Mining David C. Anastasiu and Jeremy Iverson and Shaden Smith and George with today, the so-called "Big Data". Web log data from social media sites such as Twitter produce over one

Karypis, George

349

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

350

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

351

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

352

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

353

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

354

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

355

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

356

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

357

3/3/2014 Big ideas for tinywindmills at UTA | RenewablesBiz http://www.renewablesbiz.com/article/14/03/big-ideas-tiny-windmills-uta 1/3  

E-Print Network [OSTI]

, renewable energy dwarfed by big utility ET Solar Builds Large Scale Solar Power Projects in UK Big ideas Training Webcasts - Live Webcasts - On Demand Advertise/Media Kit White Papers About Us Contact Us Home Big windmills could one day power wireless sensors that detect cracks in bridges, failures in security systems

Chiao, Jung-Chih

358

9/18/09 2:09 PM'Big Wave' Theory Offers Alternative to Dark Energy -Physical Science Page 1 of 3http://scienceblips.dailyradar.com/story/big_wave_theory_offers_alternative_to_dark_energy/  

E-Print Network [OSTI]

9/18/09 2:09 PM'Big Wave' Theory Offers Alternative to Dark Energy - Physical Science Page 1 of 3http://scienceblips.dailyradar.com/story/big_wave_theory_offers_alternative_to_dark_energy/ Gadget.com - 30 days ago 'Big Wave' Theory Offers Alternative to Dark Energy -- Mathematicians have proposed

Temple, Blake

359

EEI/DOE Transmission Capacity Report  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

360

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Sandia National Laboratories: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

362

Text-Alternative Version of Building America Webinar: Low-e Storms: The Next "Big Thing" in Window Retrofits  

Broader source: Energy.gov [DOE]

Low-e Storms:  The Next “Big Thing” in Window RetrofitsOfficial Webinar Transcript (September 9, 2014)

363

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

364

BPA, Electric Transmission Overview, October 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

365

The real problem with Merchant transmission  

SciTech Connect (OSTI)

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

366

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

367

Big Sandy Rural Elec Coop Corp | Open Energy Information  

Open Energy Info (EERE)

Rural Elec Coop Corp Rural Elec Coop Corp Jump to: navigation, search Name Big Sandy Rural Elec Coop Corp Place Kentucky Utility Id 1708 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png (SCHEDULE A-1 FARM & HOMO),Residential Residential Commercial and Small Power Commercial Large Power Rate - Primary Meter Industrial Large Power Rate - Secondary Meter Industrial Large Power Service - Primary Meter Industrial Large Power Service - Secondary Meter Industrial Light - 1,500 watt Lighting Light - 100 watt MH Lighting

368

Big Sky Regional Carbon Sequestration Partnership--Validation Phase  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Technology Program Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-1345 traci.rodosta@netl.doe.gov William Aljoe Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-6569 william.aljoe@netl.doe.gov Leslie L. Schmidt Business Contact Montana State University-Bozeman 309 Montana Hall Bozeman, MT 59717-2470 406-994-2381 lschmidt@montana.edu Lee Spangler Technical Contact Montana State University-Bozeman P.O. Box 172460 Bozeman, MT 59717-2470 406-994-4399 spangler@montana.edu PARTNERS Battelle Pacific Northwest Division Center for Advanced Energy Studies Cimarex Energy Columbia University, Lamont-Doherty Earth Observatory Crow Tribe Big Sky Regional Carbon Sequestration

369

Big Horn County Elec Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

County Elec Coop, Inc County Elec Coop, Inc Jump to: navigation, search Name Big Horn County Elec Coop, Inc Place Montana Utility Id 1683 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes ISO Other Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Demand Rate Commercial Industrial Rate Industrial Irrigation Rate Commercial Lighting Rate- (100W HPS) Lighting Lighting Rate- (175W MVL) Lighting Lighting Rate- (250W HPS) Lighting Lighting Rate- (400W MVL) Lighting Residential Rate Residential Small Commercial- Single Phase Commercial

370

Microsoft Word - BigBendSootblowerPPA_Final_061306.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6/1234 6/1234 Big Bend Power Station Neural Network-Sootblower Optimization A DOE Assessment June 2006 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory National Energy Technology Laboratory Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name,

371

Dark/visible parallel universes and Big Bang nucleosynthesis  

SciTech Connect (OSTI)

We develop a model for visible matter-dark matter interaction based on the exchange of a massive gray boson called herein the Mulato. Our model hinges on the assumption that all known particles in the visible matter have their counterparts in the dark matter. We postulate six families of particles five of which are dark. This leads to the unavoidable postulation of six parallel worlds, the visible one and five invisible worlds. A close study of big bang nucleosynthesis (BBN), baryon asymmetries, cosmic microwave background (CMB) bounds, galaxy dynamics, together with the Standard Model assumptions, help us to set a limit on the mass and width of the new gauge boson. Modification of the statistics underlying the kinetic energy distribution of particles during the BBN is also discussed. The changes in reaction rates during the BBN due to a departure from the Debye-Hueckel electron screening model is also investigated.

Bertulani, C. A.; Frederico, T.; Fuqua, J.; Hussein, M. S.; Oliveira, O.; Paula, W. de [Department of Physics and Astronomy, Texas A and M University-Commerce, Commerce TX 75429 (United States); Departamento de Fisica, Instituto Tecnologico de Aeronautica, DCTA 12.228-900, Sao Jose dos Campos, SP (Brazil); Department of Physics and Astronomy, Texas A and M University-Commerce, Commerce TX 75429 (United States); Instituto de Fisica, Universidade de Sao Paulo, Caixa Postal 66318, 05314-970 Sao Paulo, SP (Brazil); Departamento de Fisica, Instituto Tecnologico de Aeronautica, DCTA 12.228-900, Sao Jose dos Campos, SP, Brazil and Departamento de Fisica, Universidade de Coimbra, 3004-516 Coimbra (Portugal); Departamento de Fisica, Instituto Tecnologico de Aeronautica, DCTA 12.228-900, Sao Jose dos Campos, SP (Brazil)

2012-11-20T23:59:59.000Z

372

Fast algorithm for relaxation processes in big-data systems  

Science Journals Connector (OSTI)

Relaxation processes driven by a Laplacian matrix can be found in many real-world big-data systems, for example, in search engines on the World Wide Web and the dynamic load-balancing protocols in mesh networks. To numerically implement such processes, a fast-running algorithm for the calculation of the pseudoinverse of the Laplacian matrix is essential. Here we propose an algorithm which computes quickly and efficiently the pseudoinverse of Markov chain generator matrices satisfying the detailed-balance condition, a general class of matrices including the Laplacian. The algorithm utilizes the renormalization of the Gaussian integral. In addition to its applicability to a wide range of problems, the algorithm outperforms other algorithms in its ability to compute within a manageable computing time arbitrary elements of the pseudoinverse of a matrix of size millions by millions. Therefore our algorithm can be used very widely in analyzing the relaxation processes occurring on large-scale networked systems.

S. Hwang; D.-S. Lee; B. Kahng

2014-10-06T23:59:59.000Z

373

Dark/visible parallel universes and Big Bang nucleosynthesis  

Science Journals Connector (OSTI)

We develop a model for visible matter-dark matter interaction based on the exchange of a massive gray boson called herein the Mulato. Our model hinges on the assumption that all known particles in the visible matter have their counterparts in the dark matter. We postulate six families of particles five of which are dark. This leads to the unavoidable postulation of six parallel worlds the visible one and five invisible worlds. A close study of big bang nucleosynthesis (BBN) baryon asymmetries cosmic microwave background (CMB) bounds galaxy dynamics together with the Standard Model assumptions help us to set a limit on the mass and width of the new gauge boson. Modification of the statistics underlying the kinetic energy distribution of particles during the BBN is also discussed. The changes in reaction rates during the BBN due to a departure from the Debye-Hueckel electron screening model is also investigated.

C. A. Bertulani; T. Frederico; J. Fuqua; M. S. Hussein; O. Oliveira; W. de Paula

2012-01-01T23:59:59.000Z

374

Lithium-6 : Evolution from Big Bang to Present  

E-Print Network [OSTI]

The primordial abundances of Deuterium, he4, and li7 are crucial to determination of the baryon density of the Universe in the framework of standard Big Bang nucleosynthesis (BBN). li6 which is only produced in tiny quantities and it is generally not considered to be a cosmological probe. However, recent major observational advances have produced an estimate of the li6/li7 ratio in a few very old stars in the galactic halo which impacts the question whether or not the lithium isotopes are depleted in the outer layers of halo stars, through proton induced reactions at the base of (or below) the convective zone. li6 is a pure product of spallation through the major production reactions, fast oxygen and alphas interacting on interstellar H, He (especially in the early Galaxy). The rapid nuclei are both synthesized and accelerated by SN II. In this context, the \\li6 evolution should go in step with that of beryllium and boron, recently observed by the Keck and HST telescopes. Li6 adds a new constraint on the early spallation in the Galaxy. In particular, if confirmed, the Li6/Be9 ratio observed in two halo stars (HD 84937, BD +263578) gives strong boundary conditions on the composition and the spectrum of the rapid particles involved. We show that Li6 is essentially intact in halo stars, and a fortiori \\li7. We can define a range of the Li6 abundance in the very early Galaxy consistent with Big Bang nucleosynthesis (5.6 10(-14) to 3. 10(-13) . Following the evolution at increasing metallicity, we explain the abundance in the solar system within a factor of about 2.

Elisabeth Vangioni-Flam; Michel Casse; Roger Cayrel; Jean Audouze; Monique Spite; Francois Spite

1998-11-20T23:59:59.000Z

375

Design of a telescope pointing and tracking subsystem for the Big Bear Solar Observatory New Solar Telescope  

E-Print Network [OSTI]

, California, U.S.A.; bNew Jersey Institute of Technology, Newark, New Jersey, U.S.A. ABSTRACT The New SolarDesign of a telescope pointing and tracking subsystem for the Big Bear Solar Observatory New Solar Telescope J. R. Varsika and G.Yangb aBig Bear Solar Observatory, 40386 North Shore Lane, Big Bear City

376

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers [EERE]

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

377

Western-UGP Transmission and Ancillary Services Rates Customer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

378

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

379

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

380

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

382

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

383

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

384

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

385

FPL's Christmas 1991 transmission outages  

SciTech Connect (OSTI)

A record number of contamination related outages occurred on FPL transmission lines during Christmas of 1991 and resulted in an investigation of inservice insulator performance. The field investigation process used was enhanced by recent improvements in outage data recording. Also used in the analysis were weather information, the results of recently completed accelerated aging tests of polymers, and specially conducted tests on the effects of weathering steel stain on porcelain insulators. Specific insulator problems were identified and actions taken to reduce the possibility of recurrence.

Burnham, J.T.; Busch, D.W.; Renowden, J.D. (Florida Power Light Co., Juno Beach, FL (United States). Transmission Line Dept.)

1993-10-01T23:59:59.000Z

386

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

387

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

388

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

389

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

390

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

391

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

392

Asynchronous Object Storage with QoS for Scientific and Commercial Big Data  

SciTech Connect (OSTI)

This paper presents our design for an asynchronous object storage system intended for use in scientific and commercial big data workloads. Use cases from the target workload do- mains are used to motivate the key abstractions used in the application programming interface (API). The architecture of the Scalable Object Store (SOS), a prototype object stor- age system that supports the API s facilities, is presented. The SOS serves as a vehicle for future research into scalable and resilient big data object storage. We briefly review our research into providing efficient storage servers capable of providing quality of service (QoS) contracts relevant for big data use cases.

Brim, Michael J [ORNL] [ORNL; Dillow, David A [ORNL] [ORNL; Oral, H Sarp [ORNL] [ORNL; Settlemyer, Bradley W [ORNL] [ORNL; Wang, Feiyi [ORNL] [ORNL

2013-01-01T23:59:59.000Z

393

Building a Better Transmission Tower | Department of Energy  

Energy Savers [EERE]

500-kilovolt tower one of hundreds on the McNary-John Day line saving BPA big bucks. | Photo courtesy of Bonneville Power Administration A helicopter hoists...

394

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

395

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

396

Magnetically insulated transmission line oscillator  

DOE Patents [OSTI]

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

397

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

398

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

399

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

400

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

402

Transmission Electron Microscope and Scanning Electron Microscopes -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

403

Discover and Deliver: The Big Picture on Energy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Discover and Deliver: The Big Picture on Energy Discover and Deliver: The Big Picture on Energy Discover and Deliver: The Big Picture on Energy January 20, 2011 - 1:49pm Addthis Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We are changing the way the Department of Energy works -- creating new jobs, investing in the clean energy economy, and helping consumers save money while saving energy. Our work has strengthened nuclear safety and security in the U.S. and internationally. Sometimes when one gets so focused on the daily tasks at hand, it's easy to lose sight of the big picture around us. But when you take a step back, it is an impressive canvass. Thanks to the hard work of everyone at the Department of Energy over the past year, we've made remarkable progress in laying the foundation for a new energy future, advancing groundbreaking

404

EM Wins Awards for Taking Big Steps to Reduce DOE's Electronics Footprint  

Broader source: Energy.gov (indexed) [DOE]

EM Wins Awards for Taking Big Steps to Reduce DOE's Electronics EM Wins Awards for Taking Big Steps to Reduce DOE's Electronics Footprint EM Wins Awards for Taking Big Steps to Reduce DOE's Electronics Footprint July 1, 2012 - 12:00pm Addthis Every year, Americans generate almost 2.5 million tons of used electronics, which are made from valuable resources such as precious metals and rare earth materials, as well as plastic and glass. Photo: U.S Environmental Protection Agency Every year, Americans generate almost 2.5 million tons of used electronics, which are made from valuable resources such as precious metals and rare earth materials, as well as plastic and glass. Photo: U.S Environmental Protection Agency WASHINGTON, D.C. - EM is talking big steps to reduce its electronics footprint with exceptional results. EM sites won the majority of awards

405

LANL participates in the "Next Big Idea" activities on September 15  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LANL participates in the "Next Big Idea" LANL participates in the "Next Big Idea" Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit LANL participates in the "Next Big Idea" activities on September 15 The Bradbury Science Museum is holding activities to dazzle and delight. September 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email There will be a demonstration by guest scientist Stan Cohen of his "tool for making computers that can sense and control more of the physical world than a desktop computer." Fall is around the corner, and so is Los Alamos' annual "Next Big Idea" event on Saturday, September 15. To help promote the unique and

406

Discover and Deliver: The Big Picture on Energy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Discover and Deliver: The Big Picture on Energy Discover and Deliver: The Big Picture on Energy Discover and Deliver: The Big Picture on Energy January 20, 2011 - 1:49pm Addthis Secretary Chu Secretary Chu Former Secretary of Energy What does this mean for me? We are changing the way the Department of Energy works -- creating new jobs, investing in the clean energy economy, and helping consumers save money while saving energy. Our work has strengthened nuclear safety and security in the U.S. and internationally. Sometimes when one gets so focused on the daily tasks at hand, it's easy to lose sight of the big picture around us. But when you take a step back, it is an impressive canvass. Thanks to the hard work of everyone at the Department of Energy over the past year, we've made remarkable progress in laying the foundation for a new energy future, advancing groundbreaking

407

Magnetic measurements of recent sediments from Big Moose Lake, Adirondack Mountains, N.Y., USA  

Science Journals Connector (OSTI)

Measurements of anhysteretic (ARM) and isothermal (IRM) remanences in cores 6 and 8 from Big Moose Lake reveal evidence for changes in magnetic mineralogy and grain size within and between the two cores. It is...

Frank Oldfield

1990-01-01T23:59:59.000Z

408

Almost 20 years of recycling makes a big difference | Y-12 National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Almost 20 years of ... Almost 20 years of recycling makes a big difference Posted: January 16, 2013 - 2:00pm Thanks to a Y-12 National Security Complex aluminum beverage can...

409

E-Print Network 3.0 - atlas big wheel Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

wheel Search Powered by Explorit Topic List Advanced Search Sample search results for: atlas big wheel Page: << < 1 2 3 4 5 > >> 1 A Slip Model for the Spherical Actuation of the...

410

Vascular Plant Survey of the Canyonlands Unit of the Big Thicket National Preserve, Tyler County, Texas  

E-Print Network [OSTI]

The Big Thicket National Preserve is located in the southern part of the United States. It is within the Pineywoods vegetation region of southeastern Texas. This study area was the Canyonlands Unit, a unit located entirely within Tyler County, Texas...

Haile, Kelly

2012-10-19T23:59:59.000Z

411

BR UFF BIG PINEY WILD ROSE BLU E GAP BR UFF UNIT WAMSUT TER  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Morehouse (2), Jack Perrin (1), Steve Jackson (1) and Robert King (2) (1) Z, Inc., (2) Energy Information Administration BIG PINEY TIP TOP BIR D CANYON SWAN FONTEN ELL E LABARGE...

412

Big Data for Disease Control: Interdisciplinary approaches to data linkage and management   

E-Print Network [OSTI]

The source of tremendous promise and unsettling surveillance alike, the term ‘Big Data’ has attracted substantial public attention in recent years, garnering widespread press coverage and debate in equal measure. In reality it is like any other...

Lee, Shona Jane

2014-08-26T23:59:59.000Z

413

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

414

Big Creek Hot Springs Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Creek Hot Springs Geothermal Area Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Big Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.3067,"lon":-114.3375,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

415

Lithium-6 Evolution from Big Bang to Present  

E-Print Network [OSTI]

The primordial abundances of Deuterium, he4, and li7 are crucial to determination of the baryon density of the Universe in the framework of standard Big Bang nucleosynthesis (BBN). li6 which is only produced in tiny quantities and it is generally not considered to be a cosmological probe. However, recent major observational advances have produced an estimate of the li6/li7 ratio in a few very old stars in the galactic halo which impacts the question whether or not the lithium isotopes are depleted in the outer layers of halo stars, through proton induced reactions at the base of (or below) the convective zone. li6 is a pure product of spallation through the major production reactions, fast oxygen and alphas interacting on interstellar H, He (especially in the early Galaxy). The rapid nuclei are both synthesized and accelerated by SN II. In this context, the \\li6 evolution should go in step with that of beryllium and boron, recently observed by the Keck and HST telescopes. Li6 adds a new constraint on the earl...

Vangioni-Flam, E; Cayrel, R; Audouze, Jean; Spite, M; Spite, F; Vangioni-Flam, Elisabeth; Casse, Michel; Cayrel, Roger; Audouze, Jean; Spite, Monique; Spite, Francois

1998-01-01T23:59:59.000Z

416

Modified big bang nucleosynthesis with non-standard neutron sources  

E-Print Network [OSTI]

During big bang nucleosynthesis, any injection of extra neutrons around the time of the $^7$Be formation, i.e. at a temperature of order $T \\simeq 50$~keV, can reduce the predicted freeze-out amount of $^7$Be + $^7$Li that otherwise remains in sharp contradiction with the Spite plateau value inferred from the observations of Pop II stars. However, the growing confidence in the primordial D/H determinations puts a strong constraint on any such scenario. We address this issue in detail, analyzing different temporal patterns of neutron injection, such as decay, annihilation, resonant annihilation, and oscillation between mirror and standard model world neutrons. For this latter case, we derive the realistic injection pattern taking into account thermal effects (damping and refraction) in the primordial plasma. If the extra neutron supply is the sole non-standard mechanism operating during the BBN, the suppression of lithium abundance below Li/H~$\\leq 1.9 \\times 10^{-10}$ always leads to the overproduction of deuterium, D/H~$\\geq 3.6 \\times 10^{-5}$, well outside the error bars suggested by recent observations.

Alain Coc; Maxim Pospelov; Jean-Philippe Uzan; Elisabeth Vangioni

2014-05-07T23:59:59.000Z

417

Big Bang Day : Afternoon Play - Torchwood: Lost Souls  

ScienceCinema (OSTI)

Martha Jones, ex-time traveller and now working as a doctor for a UN task force, has been called to CERN where they're about to activate the Large Hadron Collider. Once activated, the Collider will fire beams of protons together recreating conditions a billionth of a second after the Big Bang - and potentially allowing the human race a greater insight into what the Universe is made of. But so much could go wrong - it could open a gateway to a parallel dimension, or create a black hole - and now voices from the past are calling out to people and scientists have started to disappear... Where have the missing scientists gone? What is the secret of the glowing man? What is lurking in the underground tunnel? And do the dead ever really stay dead? Lost Souls is a spin-off from the award-winning BBC Wales TV production Torchwood. It stars John Barrowman, Freema Agyeman, Eve Myles, Gareth David-Lloyd, Lucy Montgomery (of Titty Bang Bang) and Stephen Critchlow.

None

2011-04-25T23:59:59.000Z

418

The NACRE Thermonuclear Reaction Compilation and Big Bang Nucleosynthesis  

E-Print Network [OSTI]

The theoretical predictions of big bang nucleosynthesis (BBN) are dominated by uncertainties in the input nuclear reaction cross sections. In this paper, we examine the impact on BBN of the recent compilation of nuclear data and thermonuclear reactions rates by the NACRE collaboration. We confirm that the adopted rates do not make large overall changes in central values of predictions, but do affect the magnitude of the uncertainties in these predictions. Therefore, we then examine in detail the uncertainties in the individual reaction rates considered by NACRE. When the error estimates by NACRE are treated as 1\\sigma limits, the resulting BBN error budget is similar to those of previous tabulations. We propose two new procedures for deriving reaction rate uncertainties from the nuclear data: one which sets lower limits to the error, and one which we believe is a reasonable description of the present error budget. We propagate these uncertainty estimates through the BBN code, and find that when the nuclear data errors are described most accurately, the resulting light element uncertainties are notably smaller than in some previous tabulations, but larger than others. Using these results, we derive limits on the cosmic baryon-to-photon ratio $\\eta$, and compare this to independent limits on $\\eta$ from recent balloon-borne measurements of the cosmic microwave background radiation (CMB). We discuss means to improve the BBN results via key nuclear reaction measurements and light element observations.

Richard H. Cyburt; Brian D. Fields; Keith A. Olive

2001-05-17T23:59:59.000Z

419

Seismic mapping of alluvial fans and sub-fan bedrock in Big Bend National Park, Texas  

E-Print Network [OSTI]

Layered Models Anomalous Time-Distance Plots Error Analysis Geologic Interpretations of Results CONCLUSIONS RECOMMENDATIONS REFERENCES ~ APPENDIX VITA 7 8 10 11 16 16 18 23 29 32 32 45 47 50 52 LIST OF FIGURES Figure Page 1 Ground...-water resource investigation study area Big Bend National Park, Texas 2 Location of seismic surveys within the Big Bend study area 3 Comparison of seismic surveys to driller's logs 12 4 Hypothetical three-layer case with dipping layers 20 5 Representative...

Monti, Joseph

1984-01-01T23:59:59.000Z

420

(DOE/EIS-0285/SA-113-1): Supplement Analysis for the Transmission System Vegetation Management Program Updates 9/27/02 SA-113 12/2/02  

Broader source: Energy.gov (indexed) [DOE]

12/02/02 12/02/02 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program (DOE/EIS-0285/SA-113-1) Updates 9/27/02 SA-113 Bill Erickson, TFP/Walla Walla Natural Resource Specialist Proposed Action: To perform remedial vegetation management for keeping vegetation a safe distance away from electric power facilities and controlling noxious weeds within a section of BPA's Big Eddy-Ostrander Transmission Corridor. During a site review conducted in late fall of 2001, the inspector observed various species of hardwood trees resprouted from stumps. The new vegetative growth encroached on the required "Minimum Safe Distance" between the top of vegetation and the conductor cables. The management action is necessary to reduce the current and potential future hazards that tall- growing vegetation poses to transmission

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

NREL: Transmission Grid Integration - Research Staff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

422

RRTT - Rapid Response Team for Transmission  

Broader source: Energy.gov (indexed) [DOE]

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

423

Richard Shaheen named Senior VP of Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and operational accomplishments that will serve BPA well as we continue to strengthen our safety culture, sustain our core transmission assets and modernize our electric grid."...

424

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

425

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network [OSTI]

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the… (more)

Malathi, V

2014-01-01T23:59:59.000Z

426

Natural Gas Transmission and Distribution Module  

U.S. Energy Information Administration (EIA) Indexed Site

31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT...

427

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

428

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

429

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

430

Nevada Transmission Siting Information | Open Energy Information  

Open Energy Info (EERE)

Siting Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting...

431

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

432

Webinar: Understanding the Interconnection and Transmission Service...  

Broader source: Energy.gov (indexed) [DOE]

Tribal Energy Sufficiency and Economic Development U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S....

433

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

434

Electricity Transmission, A Primer | Open Energy Information  

Open Energy Info (EERE)

A Primer Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State...

435

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

436

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

437

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

438

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

439

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

440

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

442

Big Problems. Big Results.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

help in the design of new materials for energy production and storage. Intellectual Powerhouse PNNL is a DOE laboratory under DOE's Office of Science. Our quest for innovation is...

443

Comments of New England Electric Transmission Corporation on Proposed Open  

Broader source: Energy.gov (indexed) [DOE]

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

444

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

445

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

446

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

447

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

448

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

449

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

450

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

451

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

452

Physics of information representation, transmission and processing  

Science Journals Connector (OSTI)

The paper presents the theory of physical model of information representation, transmission and processing together with their features which yield into introduction of classical and quantum informatics principles. These features are mathematically described ... Keywords: information physics, information representation, quantum informatics, transmission and processing

Miroslav Svítek

2009-11-01T23:59:59.000Z

453

Ecological benefits of dc power transmission  

SciTech Connect (OSTI)

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

454

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network [OSTI]

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

455

Big Sky Carbon Sequestration Partnership--Phase I  

SciTech Connect (OSTI)

The Big Sky Carbon Sequestration Partnership, led by Montana State University, is comprised of research institutions, public entities and private sectors organizations, and the Confederated Salish and Kootenai Tribes and the Nez Perce Tribe. Efforts under this Partnership in Phase I are organized into four areas: (1) Evaluation of sources and carbon sequestration sinks that will be used to determine the location of pilot demonstrations in Phase II; (2) Development of GIS-based reporting framework that links with national networks; (3) Design of an integrated suite of monitoring, measuring, and verification technologies, market-based opportunities for carbon management, and an economic/risk assessment framework (referred to below as the Advanced Concepts component of the Phase I efforts); and (4) Initiation of a comprehensive education and outreach program. As a result of the Phase I activities, the groundwork is in place to provide an assessment of storage capabilities for CO{sub 2} utilizing the resources found in the Partnership region (both geological and terrestrial sinks), that complements the ongoing DOE research agenda in Carbon Sequestration. The geology of the Big Sky Carbon Sequestration Partnership Region is favorable for the potential sequestration of enormous volume of CO{sub 2}. The United States Geological Survey (USGS 1995) identified 10 geologic provinces and 111 plays in the region. These provinces and plays include both sedimentary rock types characteristic of oil, gas, and coal productions as well as large areas of mafic volcanic rocks. Of the 10 provinces and 111 plays, 1 province and 4 plays are located within Idaho. The remaining 9 provinces and 107 plays are dominated by sedimentary rocks and located in the states of Montana and Wyoming. The potential sequestration capacity of the 9 sedimentary provinces within the region ranges from 25,000 to almost 900,000 million metric tons of CO{sub 2}. Overall every sedimentary formation investigated has significant potential to sequester large amounts of CO{sub 2}. Simulations conducted to evaluate mineral trapping potential of mafic volcanic rock formations located in the Idaho province suggest that supercritical CO{sub 2} is converted to solid carbonate mineral within a few hundred years and permanently entombs the carbon. Although MMV for this rock type may be challenging, a carefully chosen combination of geophysical and geochemical techniques should allow assessment of the fate of CO{sub 2} in deep basalt hosted aquifers. Terrestrial carbon sequestration relies on land management practices and technologies to remove atmospheric CO{sub 2} where it is stored in trees, plants, and soil. This indirect sequestration can be implemented today and is on the front line of voluntary, market-based approaches to reduce CO{sub 2} emissions. Initial estimates of terrestrial sinks indicate a vast potential for increasing and maintaining soil Carbon (C) on rangelands, and forested, agricultural, and reclaimed lands. Rangelands can store up to an additional 0.05 mt C/ha/yr, while the croplands are on average four times that amount. Estimates of technical potential for soil sequestration within the region in cropland are in the range of 2.0 M mt C/yr over 20 year time horizon. This is equivalent to approximately 7.0 M mt CO{sub 2}e/yr. The forestry sinks are well documented, and the potential in the Big Sky region ranges from 9-15 M mt CO{sub 2} equivalent per year. Value-added benefits include enhanced yields, reduced erosion, and increased wildlife habitat. Thus the terrestrial sinks provide a viable, environmentally beneficial, and relatively low cost sink that is available to sequester C in the current time frame. The Partnership recognizes the critical importance of measurement, monitoring, and verification technologies to support not only carbon trading but all policies and programs that DOE and other agencies may want to pursue in support of GHG mitigation. The efforts in developing and implementing MMV technologies for geological and terrestrial sequestration re

Susan M. Capalbo

2005-10-01T23:59:59.000Z

456

Big Sky Carbon Sequestration Partnership--Phase I  

SciTech Connect (OSTI)

The Big Sky Carbon Sequestration Partnership, led by Montana State University, is comprised of research institutions, public entities and private sectors organizations, and the Confederated Salish and Kootenai Tribes and the Nez Perce Tribe. Efforts under this Partnership in Phase I are organized into four areas: (1) Evaluation of sources and carbon sequestration sinks that will be used to determine the location of pilot demonstrations in Phase II; (2) Development of GIS-based reporting framework that links with national networks; (3) Design of an integrated suite of monitoring, measuring, and verification technologies, market-based opportunities for carbon management, and an economic/risk assessment framework (referred to below as the Advanced Concepts component of the Phase I efforts); and (4) Initiation of a comprehensive education and outreach program. As a result of the Phase I activities, the groundwork is in place to provide an assessment of storage capabilities for CO{sub 2} utilizing the resources found in the Partnership region (both geological and terrestrial sinks), that complements the ongoing DOE research agenda in Carbon Sequestration. The geology of the Big Sky Carbon Sequestration Partnership Region is favorable for the potential sequestration of enormous volume of CO{sub 2}. The United States Geological Survey (USGS 1995) identified 10 geologic provinces and 111 plays in the region. These provinces and plays include both sedimentary rock types characteristic of oil, gas, and coal productions as well as large areas of mafic volcanic rocks. Of the 10 provinces and 111 plays, 1 province and 4 plays are located within Idaho. The remaining 9 provinces and 107 plays are dominated by sedimentary rocks and located in the states of Montana and Wyoming. The potential sequestration capacity of the 9 sedimentary provinces within the region ranges from 25,000 to almost 900,000 million metric tons of CO{sub 2}. Overall every sedimentary formation investigated has significant potential to sequester large amounts of CO{sub 2}. Simulations conducted to evaluate mineral trapping potential of mafic volcanic rock formations located in the Idaho province suggest that supercritical CO{sub 2} is converted to solid carbonate mineral within a few hundred years and permanently entombs the carbon. Although MMV for this rock type may be challenging, a carefully chosen combination of geophysical and geochemical techniques should allow assessment of the fate of CO{sub 2} in deep basalt hosted aquifers. Terrestrial carbon sequestration relies on land management practices and technologies to remove atmospheric CO{sub 2} where it is stored in trees, plants, and soil. This indirect sequestration can be implemented today and is on the front line of voluntary, market-based approaches to reduce CO{sub 2} emissions. Initial estimates of terrestrial sinks indicate a vast potential for increasing and maintaining soil Carbon (C) on rangelands, and forested, agricultural, and reclaimed lands. Rangelands can store up to an additional 0.05 mt C/ha/yr, while the croplands are on average four times that amount. Estimates of technical potential for soil sequestration within the region in cropland are in the range of 2.0 M mt C/yr over 20 year time horizon. This is equivalent to approximately 7.0 M mt CO{sub 2}e/yr. The forestry sinks are well documented, and the potential in the Big Sky region ranges from 9-15 M mt CO{sub 2} equivalent per year. Value-added benefits include enhanced yields, reduced erosion, and increased wildlife habitat. Thus the terrestrial sinks provide a viable, environmentally beneficial, and relatively low cost sink that is available to sequester C in the current time frame. The Partnership recognizes the critical importance of measurement, monitoring, and verification technologies to support not only carbon trading but all policies and programs that DOE and other agencies may want to pursue in support of GHG mitigation. The efforts in developing and implementing MMV technologies for geological and terrestrial sequestration re

Susan M. Capalbo

2006-01-01T23:59:59.000Z

457

Coordination of Federal Authorizations for Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

458

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

459

9/18/09 2:43 PM'Big Wave' Theory Offers Alternative to Dark Energy // Current Page 1 of 11http://current.com/items/90718274_big-wave-theory-offers-alternative-to-dark-energy.htm  

E-Print Network [OSTI]

9/18/09 2:43 PM'Big Wave' Theory Offers Alternative to Dark Energy // Current Page 1 of 11http://current.com/items/90718274_big-wave-theory-offers-alternative-to-dark-energy.htm login | register |home tv shows schedule to Dark Energy // Current Page 2 of 11http://current.com/items/90718274_big-wave-theory-offers-alternative-to-dark-energy

Temple, Blake

460

9/18/09 2:55 PMScienceNology: Big Wave Theory Offers Alternative to Dark Energy Page 1 of 5http://sciencenology.blogspot.com/2009/08/big-wave-theory-offers-alternative-to.html  

E-Print Network [OSTI]

9/18/09 2:55 PMScienceNology: Big Wave Theory Offers Alternative to Dark Energy Page 1 of 5http Offers Alternative to Dark Energy Page 2 of 5http://sciencenology.blogspot.com/2009/08/big-wave-theory-offers-alternative://sciencenology.blogspot.com/2009/08/big-wave-theory-offers-alternative-to.html home posts rss comments rss edit Home Applied

Temple, Blake

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The X^- Solution to the ^6Li and ^7Li Big Bang Nucleosynthesis Problems  

E-Print Network [OSTI]

The $^6$Li abundance observed in metal poor halo stars appears to exhibit a plateau as a function of metallicity similar to that for $^7$Li, suggesting a big bang origin. However, the inferred primordial abundance of $^6$Li is $\\sim$1000 times larger than that predicted by standard big bang nucleosynthesis for the baryon-to-photon ratio inferred from the WMAP data. Also, the inferred $^7$Li primordial abundance is 3 times smaller than the big bang prediction. We here describe in detail a possible simultaneous solution to both the problems of underproduction of $^6$Li and overproduction of $^7$Li in big bang nucleosynthesis. This solution involves a hypothetical massive, negatively-charged leptonic particle that would bind to the light nuclei produced in big bang nucleosynthesis, but would decay long before it could be detected. We consider only the $X$-nuclear reactions and assume that the effect of decay products is negligible, as would be the case if lifetime were large or the mass difference between the charged particle and its daughter were small. An interesting feature of this paradigm is that, because the particle remains bound to the existing nuclei after the cessation of the usual big bang nuclear reactions, a second longer epoch of nucleosynthesis can occur among $X$-nuclei. We confirm that reactions in which the hypothetical particle is transferred can occur that greatly enhance the production of $^6$Li while depleting $^7$Li. We also identify a new reaction that destroys large amounts of $^7$Be, and hence reduces the ultimate $^7$Li abundance. Thus, big-bang nucleosynthesis in the presence of these hypothetical particles, together with or without an event of stellar processing, can simultaneously solve the two Li abundance problems.

Motohiko Kusakabe; Toshitaka Kajino; Richard N. Boyd; Takashi Yoshida; Grant J. Mathews

2007-11-24T23:59:59.000Z

462

CRSP Transmission Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

463

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

464

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

465

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

466

Electricity Transmission Pricing: How Contracts Must Reflect Costs  

Science Journals Connector (OSTI)

This article sets out the main design elements of contracts for use of a transmission system and the basic methods of transmission pricing. It considers two methods of pricing transmission: “top-down” and “bot...

Graham Shuttleworth

1996-01-01T23:59:59.000Z

467

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network [OSTI]

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

468

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

469

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

470

Virulence, parasite mode of transmission, and host fluctuating asymmetry  

Science Journals Connector (OSTI)

...they provide a potential route for vertical transmission (Hembree & Ryan 1982...the horizontalvertical transmission sequence. Dashed lines indicate the horizontal...aeg pti depends on the transmission route of its parasite Edha ardia...

1997-01-01T23:59:59.000Z

471

Introduction. Cultural transmission and the evolution of human behaviour  

Science Journals Connector (OSTI)

...some promising lines of development...learning|cultural transmission|cultural evolution...illustration of cultural transmission delivering improved...efficient over transmission events, in line with the notion...two different routes: repeated interaction...

2008-01-01T23:59:59.000Z

472

Georgia County Turning Industrial and Farm Waste Into Big Energy Savings |  

Broader source: Energy.gov (indexed) [DOE]

Georgia County Turning Industrial and Farm Waste Into Big Energy Georgia County Turning Industrial and Farm Waste Into Big Energy Savings Georgia County Turning Industrial and Farm Waste Into Big Energy Savings March 30, 2011 - 2:44pm Addthis Interior view of the Gwinnett County "Gas To Energy" Project | Photo Courtesy of Gwinnett County, GA Interior view of the Gwinnett County "Gas To Energy" Project | Photo Courtesy of Gwinnett County, GA Tertia Speiser Project Officer, Golden Field Office What does this project do? Methane gas from biosolids, fats, oils, greases and other high strength industrial wastes is turned into energy. The county is improving efficiency and providing an alternative to clogging the sewers. The "Gas to Energy" system minimizes the impact of rising energy costs on consumers.

473

Lawrence Livermore, Intel, Cray produce big data machine to serve as  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 For immediate release: 11/04/2013 | NR-13-11-01 High Resolution Image Catalyst is a unique high performance computing (HPC) cluster that will serve research scientists and provide a proving ground for new HPC and Big Data technologies and architectures. It was recently installed at Lawrence Livermore National Laboratory. Lawrence Livermore, Intel, Cray produce big data machine to serve as catalyst for next-generation HPC clusters Donald B Johnston, LLNL, (925) 423-4902, johnston19@llnl.gov Lawrence Livermore National Laboratory in partnership with Intel and Cray, today announced a unique high performance computing (HPC) cluster that will serve research scientists at all three institutions and provide a proving ground for new HPC and Big Data technologies and architectures.

474

Knoxville Energy Deal to Net Big Savings for Taxpayers | Department of  

Broader source: Energy.gov (indexed) [DOE]

Knoxville Energy Deal to Net Big Savings for Taxpayers Knoxville Energy Deal to Net Big Savings for Taxpayers Knoxville Energy Deal to Net Big Savings for Taxpayers March 9, 2010 - 11:55am Addthis Knoxville’s energy improvements are expected to save the city $1.5 million a year in utility costs | Photo courtesy of the City Knoxville's energy improvements are expected to save the city $1.5 million a year in utility costs | Photo courtesy of the City Joshua DeLung Knoxville, Tennessee, will save millions of dollars and reduce its energy consumption and carbon emissions thanks to a $13 million deal with Massachusetts-based energy services company Ameresco. The project is structured as an Energy Services Performance Contract, which means that the energy savings realized by the city will fully pay for the cost of the upgrades.

475

Bridging the Gap: Helping Small Businesses With Big Ideas Develop New  

Broader source: Energy.gov (indexed) [DOE]

Bridging the Gap: Helping Small Businesses With Big Ideas Develop Bridging the Gap: Helping Small Businesses With Big Ideas Develop New Industries Bridging the Gap: Helping Small Businesses With Big Ideas Develop New Industries October 25, 2011 - 3:59pm Addthis Semprius, solar panels shown above, announced that it is building a factory in Henderson, NC to manufacture its high concentration photovoltaic (HCPV) solar modules and is expected to create more than 250 full-time jobs over the next five years. Semprius, solar panels shown above, announced that it is building a factory in Henderson, NC to manufacture its high concentration photovoltaic (HCPV) solar modules and is expected to create more than 250 full-time jobs over the next five years. Keri Fulton Public Affairs Specialist, Office of Public Affairs What does this mean for me?

476

Dacite Melt at the Puna Geothermal Venture Wellfield, Big Island of Hawaii  

Open Energy Info (EERE)

Dacite Melt at the Puna Geothermal Venture Wellfield, Big Island of Hawaii Dacite Melt at the Puna Geothermal Venture Wellfield, Big Island of Hawaii Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Dacite Melt at the Puna Geothermal Venture Wellfield, Big Island of Hawaii Abstract During the drilling of injection well KS-13 in 2005 at the Puna Geothermal Venture (PGV) well field, on the island of Hawaii, a 75-meter interval of diorite containing brown glass inclusions was penetrated at a depth of 2415 m. At a depth of 2488 m a melt of dacitic composition was encountered. The melt flowed up the well bore and was repeatedly re-drilled over a depth interval of 8 m, producing several kilograms of clear, colorless vitric cuttings at the surface. The dacitic glass cuttings have a perlitic texture, a silica content of 67 wgt.%, are enriched in alkalis and nearly

477

Recovery Act Provides Big Boost with a Nanoscale Focus | Department of  

Broader source: Energy.gov (indexed) [DOE]

Provides Big Boost with a Nanoscale Focus Provides Big Boost with a Nanoscale Focus Recovery Act Provides Big Boost with a Nanoscale Focus October 14, 2010 - 9:46am Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs What are the key facts? The Center for Functional Nanomaterials is getting a new electron microscope that will be valuable for solar cell research -- one of 7 ARRA-funded additions at the Brookhaven National Laboratory facility. Editor's note: cross posted from the Brookhaven National Laboratory The Center for Functional Nanomaterials (CFN) at Brookhaven National Laboratory is receiving more than $5 million in new equipment and upgrades funded by the American Recovery and Reinvestment Act (ARRA). The new acquisitions will fill gaps in the current facility to meet the needs of

478

Big Bend Power Station Neural Network-Intelligent Sootblower (NN-ISB) Optimization  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend Power Station neural network- Big Bend Power Station neural network- intelligent SootBlower (nn-iSB) oPtimization (comPleted) Project Description The overall goal of this project was to develop a Neural Network-Intelligent Sootblowing (NN-ISB) system on the 445 MW Tampa Electric Big Bend Unit #2 to initiate sootblowing in response to real-time events or conditions within the boiler rather than relying on general rule-based protocols. Other goals were to increase unit efficiency, reduce NO X , and improve stack opacity. In a coal-fired boiler, the buildup of ash and soot on the boiler tubes can lead to a reduction in boiler efficiency. Thus, one of the most important boiler auxiliary operations is the cleaning of heat-absorbing surfaces. Ash and soot deposits are removed by a process known as sootblowing, which uses mechanical devices for on-line cleaning

479

Small Company Makes Big Changes to Boost Clean Energy Economy | Department  

Broader source: Energy.gov (indexed) [DOE]

Small Company Makes Big Changes to Boost Clean Energy Economy Small Company Makes Big Changes to Boost Clean Energy Economy Small Company Makes Big Changes to Boost Clean Energy Economy November 27, 2013 - 9:40am Addthis Diversified Power International President Tony Trigiani inspects a part at DPI's headquarters in Tennessee. DPI is expanding its engineering, development, and manufacturing operations to keep up with demand. | Photo courtesy of Chris Davis, Tennessee Solar Institute Diversified Power International President Tony Trigiani inspects a part at DPI's headquarters in Tennessee. DPI is expanding its engineering, development, and manufacturing operations to keep up with demand. | Photo courtesy of Chris Davis, Tennessee Solar Institute Amy Kidd Project Officer, State Energy Program What are the key facts?

480

DOE research makes big bang | OSTI, US Dept of Energy, Office of Scientific  

Office of Scientific and Technical Information (OSTI)

DOE research makes big bang DOE research makes big bang Feature Archive Saul Perlmutter Photo Courtesy of Lawrence Berkeley National Laboratory Saul Perlmutter has been awarded the 2011 Nobel Prize in Physics for his breakthrough research at Lawrence Berkeley National Laboratory. He cofounded the Supernova Cosmology Project (SCP) in 1988, with the breakthrough coming ten years later. The SCP pioneered the methods used to discover the accelerating expansion of the universe through observations of distant supernovae. For many years Perlmutter has been a leader in studies to determine the nature of dark energy. Explore the universe using Science Accelerator; check out the search results for big bang and supernovae. OSTI Homepage Mobile Gallery Subscribe to RSS OSTI Blog Get Widgets Get Alert Services

Note: This page contains sample records for the topic "big eddy-knight transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Rebates Cut the Price of Big-Time Efficiency Upgrades | Department of  

Broader source: Energy.gov (indexed) [DOE]

Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades February 22, 2010 - 5:52pm Addthis One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy's rebate programs that cut the cost of whole-house energy efficiency upgrades. It can start with a visit from the "Home Energy Squad", a program offered jointly by Xcel Energy and CenterPoint Energy, the local energy providers (NEC implements the program for Xcel Energy). The Energy Squad installs simple efficiency-improving products such as compact fluorescent

482

Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Injection |  

Broader source: Energy.gov (indexed) [DOE]

Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Injection Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Injection August 13, 2013 - 1:59pm Addthis Photo by J.D. Griggs, courtesy of U.S.Geological Survey Photo by J.D. Griggs, courtesy of U.S.Geological Survey For Additional Information To learn more about the carbon storage projects in which NETL is involved, please visit the NETL Carbon Storage website How can a prehistoric volcanic eruption help us reduce the amount of CO2 released into the atmosphere today? The answer is found in the basalt formations created by the lava - formations that can be used as sites for injecting carbon dioxide (CO2) captured from industrial sources in a process called carbon capture and storage (CCS).

483

Energy Upgrades to Save Small Arizona Town Big Money | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrades to Save Small Arizona Town Big Money Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Temperatures above 100 degrees mean that staying cool and being energy efficient is important to the small town of Oro Valley, Ariz. But finding the funds to do both can be a challenge. It was this heat - and the availability of a federal grant - that Bayer Vella, the town's conservation and sustainability manager, cited as a reason the city is forging ahead with energy retrofits and solar projects.

484

Supercomputing: A Toolbox to Simulate the Big Bang and Beyond | Department  

Broader source: Energy.gov (indexed) [DOE]

Supercomputing: A Toolbox to Simulate the Big Bang and Beyond Supercomputing: A Toolbox to Simulate the Big Bang and Beyond Supercomputing: A Toolbox to Simulate the Big Bang and Beyond September 19, 2013 - 1:30pm Addthis This image shows the barred spiral galaxy NGC 1398. | Image courtesy of the Dark Energy Survey. This image shows the barred spiral galaxy NGC 1398. | Image courtesy of the Dark Energy Survey. Rob Roser Rob Roser Head, Fermilab Scientific Computing Division What does this project do? A new project sponsored by three of the Energy Department's National Labs will allow scientists to study the evolution of our universe in greater detail with a new cosmological simulation analysis toolbox. This project takes advantage of the Energy Department's investments in supercomputers and specialized high-performance computing

485

New Blog Seeks Out the "Next Big Thing" | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

New Blog Seeks Out the "Next Big Thing" New Blog Seeks Out the "Next Big Thing" New Blog Seeks Out the "Next Big Thing" December 5, 2011 - 2:36pm Addthis Researchers with the Energy Department’s Joint BioEnergy Institute (JBEI) at Lawrence Berkeley National Lab have identified a potential new advanced biofuel that could replace today’s standard fuel if successfully commercialized. The new blog TechStream will focus on new technologies coming out of the lab. | Photo courtesy of Lawrence Berkeley National Lab. Researchers with the Energy Department's Joint BioEnergy Institute (JBEI) at Lawrence Berkeley National Lab have identified a potential new advanced biofuel that could replace today's standard fuel if successfully commercialized. The new blog TechStream will focus on new technologies

486

Solar Goes Big: Launching the California Valley Solar Ranch | Department of  

Broader source: Energy.gov (indexed) [DOE]

Goes Big: Launching the California Valley Solar Ranch Goes Big: Launching the California Valley Solar Ranch Solar Goes Big: Launching the California Valley Solar Ranch October 31, 2013 - 4:14pm Addthis The California Valley Solar Ranch produces clean, renewable electricity at the scale of traditional power plants. | Photo courtesy of SunPower. The California Valley Solar Ranch produces clean, renewable electricity at the scale of traditional power plants. | Photo courtesy of SunPower. Aerial shot of the California Valley Solar Ranch in San Luis Obispo County, California. | Photo courtesy of SunPower. Aerial shot of the California Valley Solar Ranch in San Luis Obispo County, California. | Photo courtesy of SunPower. According to NRG Energy, the California Solar Valley Ranch project has created thousands of jobs and put an estimated $315 million into the local economy. | Photo courtesy of SunPower.

487

Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Injection |  

Broader source: Energy.gov (indexed) [DOE]

Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Injection Ancient Lava Flows Trap CO2 for Long-Term Storage in Big Sky Injection August 13, 2013 - 1:59pm Addthis Photo by J.D. Griggs, courtesy of U.S.Geological Survey Photo by J.D. Griggs, courtesy of U.S.Geological Survey For Additional Information To learn more about the carbon storage projects in which NETL is involved, please visit the NETL Carbon Storage website How can a prehistoric volcanic eruption help us reduce the amount of CO2 released into the atmosphere today? The answer is found in the basalt formations created by the lava - formations that can be used as sites for injecting carbon dioxide (CO2) captured from industrial sources in a process called carbon capture and storage (CCS).

488

Georgia County Turning Industrial and Farm Waste Into Big Energy Savings |  

Broader source: Energy.gov (indexed) [DOE]

Georgia County Turning Industrial and Farm Waste Into Big Energy Georgia County Turning Industrial and Farm Waste Into Big Energy Savings Georgia County Turning Industrial and Farm Waste Into Big Energy Savings March 30, 2011 - 2:44pm Addthis Interior view of the Gwinnett County "Gas To Energy" Project | Photo Courtesy of Gwinnett County, GA Interior view of the Gwinnett County "Gas To Energy" Project | Photo Courtesy of Gwinnett County, GA Tertia Speiser Project Officer, Golden Field Office What does this project do? Methane gas from biosolids, fats, oils, greases and other high strength industrial wastes is turned into energy. The county is improving efficiency and providing an alternative to clogging the sewers. The "Gas to Energy" system minimizes the impact of rising energy costs on consumers.

489

Saving Energy Where It Matters Most: A Hopeful Look at the Big Picture |  

Broader source: Energy.gov (indexed) [DOE]

Where It Matters Most: A Hopeful Look at the Big Where It Matters Most: A Hopeful Look at the Big Picture Saving Energy Where It Matters Most: A Hopeful Look at the Big Picture December 14, 2009 - 7:30am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy Most of the time, I feel like I'm doing my part to save energy, and I'm getting better all the time. But sometimes I feel like what I do to try to offset the unfathomable amount of energy that's consumed around me, and around the country, is so tiny that my actions won't make a ripple of difference. I wonder how the few hundred kilowatt hours per month I shave off through my conscientious behavior and my use of energy-efficient products and appliances means something in the face of the American economic juggernaut.

490

Hurricane Season: Restoring Power after a Big Storm | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hurricane Season: Restoring Power after a Big Storm Hurricane Season: Restoring Power after a Big Storm Hurricane Season: Restoring Power after a Big Storm June 5, 2012 - 4:01pm Addthis Hurricane Irene made landfall on the coast of North Carolina as a Category 1 hurricane during the 2011 Atlantic hurricane season. It was the ninth named storm, first hurricane, and first major hurricane of the 2011 hurricane season. | Photo courtesy of the National Oceanic and Atmospheric Administration. Hurricane Irene made landfall on the coast of North Carolina as a Category 1 hurricane during the 2011 Atlantic hurricane season. It was the ninth named storm, first hurricane, and first major hurricane of the 2011 hurricane season. | Photo courtesy of the National Oceanic and Atmospheric Administration. William Bryan William Bryan

491

Taking Battery Technology from the Lab to the Big City | Department of  

Broader source: Energy.gov (indexed) [DOE]

Taking Battery Technology from the Lab to the Big City Taking Battery Technology from the Lab to the Big City Taking Battery Technology from the Lab to the Big City July 29, 2013 - 2:09pm Addthis Watch the video to learn how Urban Electric Power is taking battery technology from the lab to the market. | Video by Matty Greene, Energy Department. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Matty Greene Matty Greene Videographer What are the key facts? The CUNY Energy Institute developed a low-cost zinc anode rechargeable battery that can be used for grid-scale energy storage. Building on this technology, ARPA-E funded the CUNY Energy Institute to develop a long-lasting, fully rechargeable battery that can store renewable energy for future grid-use at any location. In 2012, Urban Electric Power was formed to commercialize the

492

Lighting the Way for Big Energy Savings in Los Angeles | Department of  

Broader source: Energy.gov (indexed) [DOE]

Lighting the Way for Big Energy Savings in Los Angeles Lighting the Way for Big Energy Savings in Los Angeles Lighting the Way for Big Energy Savings in Los Angeles November 14, 2013 - 1:10pm Addthis A Los Angeles lighting project is saving the city $7 million a year in electricity costs. | Photo courtesy of Los Angeles Bureau of Street Lighting A Los Angeles lighting project is saving the city $7 million a year in electricity costs. | Photo courtesy of Los Angeles Bureau of Street Lighting Jim Brodrick Lighting Program Manager The world's largest light emitting diode (LED) conversion project to date is under way in Los Angeles, California. In the project's first phase alone, the city retrofitted over 141,000 streetlights, reducing energy use by 63% and saving the city $7 million a year in electricity costs. The project is expected to reduce carbon

493

U.S. strategic petroleum reserve Big Hill 114 leak analysis 2012.  

SciTech Connect (OSTI)

This report addresses recent well integrity issues related to cavern 114 at the Big Hill Strategic Petroleum Reserve site. DM Petroleum Operations, M&O contractor for the U.S. Strategic Petroleum Reserve, recognized an apparent leak in Big Hill cavern well 114A in late summer, 2012, and provided written notice to the State of Texas as required by law. DM has since isolated the leak in well A with a temporary plug, and is planning on remediating both 114 A- and B-wells with liners. In this report Sandia provides an analysis of the apparent leak that includes: (i) estimated leak volume, (ii) recommendation for operating pressure to maintain in the cavern between temporary and permanent fixes for the well integrity issues, and (iii) identification of other caverns or wells at Big Hill that should be monitored closely in light of the sequence of failures there in the last several years.

Lord, David L.; Roberts, Barry L.; Lord, Anna C. Snider; Sobolik, Steven Ronald; Park, Byoung Yoon; Rudeen, David Keith [GRAM, Inc., Albuquerque, NM

2013-06-01T23:59:59.000Z

494

Strategic Petroleum Reserve (SPR) geological site characterization report, Big Hill Salt Dome  

SciTech Connect (OSTI)

Geological and geophysical analyses of the Big Hill Salt Dome were performed to determine the suitability of this site for use in the Strategic Petroleum Reserve (SPR). Development of 140 million barrels (MMB) of storage capacity in the Big Hill Salt Dome is planned as part of the SPR expansion to achieve 750 MMB of storage capacity. Objectives of the study were to: (1) Acquire, evaluate, and interpret existing data pertinent to geological characterization of the Big Hill Dome; (2) Characterize the surface and near-surface geology and hydrology; (3) Characterize the geology and hydrology of the overlying cap rock; (4) Define the geometry and geology of the dome; (5) Determine the feasibility of locating and constructing 14 10-MMB storage caverns in the south portion of the dome; and (6) Assess the effects of natural hazards on the SPR site. Recommendations are included. (DMC)

Hart, R.J.; Ortiz, T.S.; Magorian, T.R.

1981-09-01T23:59:59.000Z

495

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

496

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

497

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

498

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel...

499

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a...

500

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z