National Library of Energy BETA

Sample records for bi-state commission multiple

  1. Commission.

    National Nuclear Security Administration (NNSA)

    November 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and

  2. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) Annual Users Training Meeting was held on May 12-15, 2014, in Denver, Colorado. The NMMSS serves a critical role in the U.S. Government's ability to maintain operational awareness of the inventory, status, and whereabouts of nuclear materials. Accuracy, transparency, and

  3. Commission.

    National Nuclear Security Administration (NNSA)

    March 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Register for the NMMSS 2015 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2015 Annual Users Training Meeting will be held May 11-14, 2015, in Las Vegas, Nevada. There is no registration fee to participate in this invaluable learning opportunity. NMMSS is the U.S. Government's official information system containing current and historical accounting

  4. Commissioning Specifications

    Broader source: Energy.gov [DOE]

    Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and...

  5. Denali Commission

    Office of Environmental Management (EM)

    - Energy Development Workshop April 29, 2014 The concept of the Denali Commission The Denali Commission Act of 1998 * Coordinate, convene * Bring infrastructure of rural Alaska up to American standards The concept of the Denali Commission For 14 years, the Commission has invested hundreds of millions of federal funds - matched with local, State, philanthropic and other federal funds - into rural Alaska - Bulk Fuel Tank Farms - Rural Power System Upgrades - Clinics - Behavioral Health Centers -

  6. Beyond Commissioning

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2004-08-31

    The emerging practice of building commissioning generally provides energy savings of 10% to, in some cases, more than 60% of a building's energy consumption. Moreover, commissioning ensures that equipment and systems are installed and operate properly, providing occupants with the conditions expected. Without commissioning, new buildings can have incorrect equipment installed, devices like fans installed backwards, and unimplemented control algorithms to mention a few deficiencies sometimes found. Existing buildings can have faulty and failed equipment such as clogged filters and coils, stuck dampers, leaky valves, and imbalanced air distribution, as well as overridden controls, improper set points, and incorrect schedules. Commissioning of new and existing buildings helps prevent and alleviate such problems. Yet only a small fraction of commercial buildings has ever been commissioned, and many buildings that have been commissioned have only a fraction of the recommended actions implemented. Time may change this situation or maybe other changes can accelerate the progress of commissioning. Will commissioning continue in the future as it is performed today or must it change? The authors share a vision for how the functions provided by commissioning could change in the future. The paper delves into the roles of automation technology for functional testing, diagnostics, prognostics, data management, asset tracking, and project management in building commissioning. Methods of delivery explored for these capabilities include laptop-, desktop-, and pda-based tools, web-based services, and ubiquitous embedded networked processing. The authors present a vision for how these technologies could change the practice of commissioning and the impacts this could bring for commercial buildings in the U.S. and throughout the world. Potential impacts on building performance, energy consumption, peak power, and occupant satisfaction are examined.

  7. Commissioning Guidance for ESPCs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMISSIONING GUIDANCE FOR ESPCs CONTENTS Introduction ................................................................................................................................................... 1 Overview of Commissioning in the ESPC Process ...................................................................................... 2 Summary of Roles And Responsibilities In ESPC Project Commissioning ................................................. 3 Key Elements of Commissioning

  8. SPEAR3 | Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    elog elog demo setting printer queue for elog Matlab installation Middle layer Quick Reference Middle layer software Accelerator Toolbox Parameter list (updated 06/06/05) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt) Commissioning Schedule(.mpp) Run Schedule Shift Schedule SSRL | SLAC | Stanford University | SSRL Computing | SLAC Computing last updated: DEC 09, 2005

  9. ATOMIC ENERGY COMMISSION

    Office of Legacy Management (LM)

    ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum...

  10. Guidelines for residential commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to such houses.

  11. Chapter 9: Commissioning the Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com-

  12. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  13. Retro-Commissioning Program

    Broader source: Energy.gov [DOE]

    To obtain incentives, interested applicants must work with a Retro-Commissioning Service Provider adviser to complete the initial study. Please note that customer eligibility for Focus on Energy ...

  14. California Energy Commission

    Broader source: Energy.gov (indexed) [DOE]

    California Energy Commission Quadrennial Water Review Comments - June 19, 2014 Water-Energy Nexus Water and energy systems are inextricably linked -- producing energy uses large quantities of water, and treating, transporting and heating water consumes large amounts of energy. Water delivery and wastewater treatment systems are among the largest consumers of energy in the nation. Reducing water use translates into direct energy savings. Since the California Energy Commission issued its landmark

  15. Commissioning and Retro-Commissioning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commissioning and Retro-Commissioning Resources Commissioning and Retro-Commissioning Resources To ensure a new building's systems are correctly installed and are operating properly, a commissioning program may be incorporated into all building phases, including design, construction, and operations. Likewise, a retro-commissioning process is used for identifying and improving less-than-optimal energy performance in an existing building's equipment and control systems. State and local governments

  16. Commission Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission Meetings Commission Meetings Meetings of the Commission to Review the Effectiveness of the National Energy Laboratories October 23, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015 The final public meeting of the Commission will begin at 1:00 p.m. on October 23, 2015 in the form of a Conference Call. The tentative meeting agenda includes discussion on the draft Final Report of the Commission. The Commissioners will address comments they

  17. European Commission | Open Energy Information

    Open Energy Info (EERE)

    European Commission Name: European Commission Place: Brussels, Belgium Website: ec.europa.euindexen.htm Coordinates: 50.8503396, 4.3517103 Show Map Loading map......

  18. NUCLEAR REGULATORY COMMISSION

    Office of Environmental Management (EM)

    Register: December 21, 1999 (Volume 64, Number 244)] [Proposed Rules] [Page 71331-71333] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21de99-21] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY:

  19. A Guide to Building Commissioning

    SciTech Connect (OSTI)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  20. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  1. California Coastal Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Logo: California Coastal Commission Name: California Coastal Commission Address: 45 Fremont Street, Suite 2000 Place: San Francisco,...

  2. California State Lands Commission | Open Energy Information

    Open Energy Info (EERE)

    Lands Commission Jump to: navigation, search Logo: California State Lands Commission Name: California State Lands Commission Abbreviation: CSLC Address: 100 Howe Ave., Suite 100...

  3. National Energy Commission (China) | Open Energy Information

    Open Energy Info (EERE)

    Commission (China) Jump to: navigation, search Name: National Energy Commission (China) Place: Beijing References: National Energy Commission (China)1 This article is a stub. You...

  4. Commissioning of NSLS-II

    SciTech Connect (OSTI)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  5. Commissioning Process for Federal Facilities

    Broader source: Energy.gov [DOE]

    The commissioning process for federal facilities can be completed in four steps: planning, investigation, implementation, and hand-off and integration.

  6. Commissioning for Federal Facilities | Department of Energy

    Office of Environmental Management (EM)

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. PDF icon commissioning_fed_facilities.pdf More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  7. Orlando Utilities Commission- Solar Programs

    Broader source: Energy.gov [DOE]

    The Orlando Utilities Commission (OUC) also offers incentive for solar hot water heating systems. Commercial solar hot water heating systems receive a $0.03 per kWh equivalent. Residential...

  8. Commission Meeting- November 4, 2014

    Broader source: Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories AgendaArgonne National LaboratoryTCS Conference Center9700 S. Cass AveArgonne, IL 60436November 4, 2014

  9. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect (OSTI)

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  10. October 6, 2014 Lab Commission Meeting Minutes

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its third meeting at 9:00 AM on October 6, 2014. The Commission members heard a DOE...

  11. September 15, 2014 Lab Commission Meeting Minutes

    Broader source: Energy.gov [DOE]

    This meeting was the second meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Co-Chairs TJ...

  12. California Energy Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: California Energy Commission Address: 1516 Ninth Street, MS-29 Place: Sacramento, CA Zip: 95814-5512 Website: www.energy.ca.gov...

  13. State Historical Resources Commission | Open Energy Information

    Open Energy Info (EERE)

    Resources Commission Jump to: navigation, search Name: State Historical Resources Commission Address: 1725 23rd Street, Suite 100 Place: Sacramento, CA Zip: 95816 ParentHolding...

  14. State Land Commission FAQ | Open Energy Information

    Open Energy Info (EERE)

    Land Commission FAQ Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: State Land Commission FAQ Abstract Frequently Asked Questions, California State...

  15. Mississippi Public Service Commission Adopts Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mississippi Public Service Commission Adopts Energy Efficiency Rules Mississippi Public Service Commission Adopts Energy Efficiency Rules November 8, 2013 - 12:00am Addthis ...

  16. Blue Ribbon Commission on America's Nuclear Future

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blue Ribbon Commission on America's Nuclear Future Draft Report to the Secretary of Energy ... The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary ...

  17. Arizona Corporation Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Arizona Corporation Commission Abbreviation: ACC Service Territory: Arizona Website: www.azcc.gov EIA Form 861 Data This article is a...

  18. Sandia Energy - Molten Salt Test Loop Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Energy News EC News & Events Concentrating Solar Power Solar Molten Salt Test Loop Commissioning Previous Next Molten Salt Test Loop Commissioning The Molten Salt...

  19. Brazil Interministerial Commission on Global Climate Change ...

    Open Energy Info (EERE)

    Interministerial Commission on Global Climate Change Jump to: navigation, search Name: Brazil Interministerial Commission on Global Climate Change Place: Distrito Federal...

  20. Regulatory Commission of Alaska | Open Energy Information

    Open Energy Info (EERE)

    includes general information about the RCA and its Commissioners. Commission The Alaska Public Service Commission (APSC) existed from 1960 until 1970. In 1970, the Alaska...

  1. Idaho Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Idaho Public Utilities Commission Address: P.O. Box 83720 Place: Boise, ID Zip: 83720 Website: www.puc.idaho.gov Coordinates:...

  2. Oregon Water Resources Commission | Open Energy Information

    Open Energy Info (EERE)

    Water Resources Commission Jump to: navigation, search Name: Oregon Water Resources Commission Abbreviation: OWRC Address: 725 Summer Street NE, Suite A Place: Salem, Oregon Zip:...

  3. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  4. OCTOBER 23, 2015 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its final meeting at 1:00 PM on October 23, 2015. Commission Co-Chair TJ Glauthier led the meeting. The meeting included a summary of public comments received to date, an opportunity for additional public comment, and Commission discussion and vote to approve the Final Report.

  5. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1986-11-30

    Functional organization charts for the NRC Commission Offices, Divisions, and Branches are presented.

  6. Commission.

    National Nuclear Security Administration (NNSA)

    November 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear ... (NRC) licensees, the Department of Energy (DOE)National Nuclear Security ...

  7. Commissioning in Federal Buildings | Department of Energy

    Office of Environmental Management (EM)

    Facilities » Operations & Maintenance » Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning is a quality-assurance process used to verify that a building performs according to the original design and intent, and meets the needs of the owners and occupants. The commissioning process also prepares building staff to operate and maintain the building. Federal agencies are required to make sure building systems and equipment are

  8. UNITED STATES ATOMIC ENERGY COMMISSION

    Office of Legacy Management (LM)

    A.' +4 @4.dY MDDC - 1613 UNITED STATES ATOMIC ENERGY COMMISSION 34.27 : . Production of Rarer Metals by George Meister Westinghouse Electric Corporation This document consists ofllpages. Date of ianuscrtpt: unknown Date Declassified: February 11, 1948 This document is issued for official use. Its issuance does not constitute authority to declassify coptes or versions of the same or similar content and title and by the same author(s). Technical Information Division. Oak Ridge DIrected Operations

  9. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  10. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  11. Oregon Environmental Quality Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Oregon Environmental Quality Commission Address: 811 SW 6th Avenue Place: Portland, Oregon Zip: 97204-1390 Phone Number: 503-229-5301...

  12. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  13. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  14. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  15. U. S. Atomic Energy Commission

    Office of Legacy Management (LM)

    Commission Division of Licensing and Regulation Washington 25, D. C. Attention: Mr. Eber R. Price Gentlemen: This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May Z-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. SW-154 and S.Iw-329. Reblying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have

  16. U. S. Atomic Energy Commission

    Office of Legacy Management (LM)

    Commission Division of Licensing and Regulation Washington 25, D. C. .I,.----- Attention: Mr. Eber R. Price Gentlemen: ' B?&-# This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May 2-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. S&l-154 and SNM-329. Replying to your items as listed in your letter, we submit the following in- formation'for your consideration: I.

  17. u. S. Atomic Energy Commission

    Office of Legacy Management (LM)

    October 31, 1949 Manager of Operations u. S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J. Smith Jr. Director Special Materials Division Subject: BERYLLIUM OXIDE AND COMPOUNDS Dear Sir: Thank you for your letter of-r-S&in which you suggest that a -_-...--__. member of your staff visit ouimnt to review our production facilities. Ge do not at the present time have facilities for making beryllium compounds

  18. May 22, 2015 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its ninth meeting at 9:00 AM on May 22, 2015. Commission Co-Chair Jared Cohon led the meeting. The meeting included discussion with lab directors; technology transfer coordinators; Bay area industrial partners; and site office management. The discussion was followed by an opportunity for public comment.

  19. Beyond Commissioning: The Role of Automation

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  20. PRELIMINARY Run Shutdown BL Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRELIMINARY Run Shutdown BL Commissioning Maintenance / AP SPEAR Down / Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb S 30 31 31 S 31 29 30 30 F 30 28 30 29 31 29 T 29 31 27 29 28 30 28 29 W 28 30 28 30 29 26 AP 31 AP 28 27 29 27 31 T 27 31 25 30 27 26 30 28 26 30 27 28 M 26 31 28 24 29 26 25 29 27 25 29 26 29 AP S 25 27 30 27 23 28 25 29 24 28 26 24 28 25 27 24 S 24 29 30 26 24 28 26 25 22 27 24 23 27 25 23

  1. Hawaii State Land Use Commission | Open Energy Information

    Open Energy Info (EERE)

    Hawaii State Land Use Commission Jump to: navigation, search Name: State Land Use Commission Abbreviation: LUC Place: Honolulu, Hawaii References: State Land Use Commission -...

  2. Arizona Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission Name: Arizona Oil and Gas Commission Address: 416 W. Congress Street, Suite 100 Place: Arizona Zip:...

  3. Energy Audit and Retro-Commissioning Policies for Public and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning...

  4. Chapter 9: Commissioning the Building | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Commissioning the Building Chapter 9: Commissioning the Building Chapter 9 of the LANL Sustainable Design Guide contains information on commissioning process overview and ...

  5. Oregon Public Utility Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oregon Public Utility Commission Oregon Public Utility Commission Offer comments on the United States Department of Energy Smart Grid Request for Information (RFI). PDF icon Oregon Public Utility Commission More Documents & Publications Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 Implementing the National

  6. Colorado Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    CBONDORA1251633139779 Retrieved from "http:en.openei.orgwindex.php?titleColoradoPublicUtilitiesCommission&oldid886925" Feedback Contact needs updating Image needs...

  7. Michigan Public Service Commission | Open Energy Information

    Open Energy Info (EERE)

    of the Michigan Public Service Commission is to grow Michigan's economy and enhance the quality of life of its communities by assuring safe and reliable energy,...

  8. Utah Labor Commission | Open Energy Information

    Open Energy Info (EERE)

    The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic...

  9. Texas Railroad Commission - Pollution Discharge Regulations ...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Texas Railroad Commission - Pollution Discharge Regulations Citation...

  10. Illinois Commerce Commission | Open Energy Information

    Open Energy Info (EERE)

    Commerce Commission Place: Springfield, Illinois Zip: 62701 Product: Regulator of public utilities and transportation in Illinois. Coordinates: 42.640925, -88.413644...

  11. Hawaii Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Hawaii Public Utility Commission Address: 465 South King Street 103 Place: Honolulu, Hawaii Zip: 96813 Coordinates: 21.3053513, -157.85857 Show Map Loading map......

  12. Telephone. Federal Communications Commission. Marlene H. Dortch...

    Broader source: Energy.gov (indexed) [DOE]

    Commission amends 47 CFR parts 20 and 54 as follows: PART 20-COMMERCIAL MOBILE RADIO SERVICES 1. The authority citation for part 20 continues to read as follows:...

  13. New Mexico Preservation Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: New Mexico Preservation Division Abbreviation: HPD Address: Bataan Memorial Building, 407 Galisteo Street, Suite 236 Place: Santa Fe,...

  14. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect (OSTI)

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  15. Nevada Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Nevada Public Utilities Commission Abbreviation: NPUC Address: Southern Nevada Office, 9075 West Diablo Drive, Suite 250 Place: Las Vegas, Nevada Zip: 89148 Phone Number:...

  16. Alaska Planning Commission Handbook | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska Planning Commission HandbookPermittingRegulatory GuidanceGuide...

  17. United States Atomic Energy Commission formed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Commission failed to come to grips with the growing nuclear weapons problem, the United States worked to establish its own formal organization. The transition from...

  18. Harrods commissions new CHP station

    SciTech Connect (OSTI)

    Mullins, P.

    1994-04-01

    Three new combined heat and power (CHP) sets have recently been commissioned at Harrods, the world-famous department store in the heart of London's fashionable Knightsbridge district. The sets provide all the electricity needed by the store for lighting, heating and air-conditioning and are powered by Ruston 6RK270 turbocharged, charge-air-cooled diesel engines each producing 1392 kW at 750 r/min. These high power-to-weight ratio units were chosen in view of severe engine room space limitations. Low-grade waste heat is extracted from the engine jacket water to preheat water for three new boilers supplying some 1600 kg/h of steam for process heat to the store. The engines drive Brush BJS HW 10 100/8 alternators and are fully automatic in operation through a Regulateurs Europa control system. Some 600 sensors feed data into a Satchwell Building Management System (BMS). In the event of a breakdown, the engine control system can be switched to manual. 5 figs.

  19. Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2007-01-31

    This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

  20. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  1. Instrumented home energy rating and commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  2. Investigating Potential Strategies for Automating Commissioning Activities

    SciTech Connect (OSTI)

    Brambley, Michael R.; Briggs, Robert S.; Katipamula, Srinivas; Dasher, Carolyn; Luskay, Larry; Irvine, Linda

    2002-05-31

    This paper provides summary results from a project on automated and continuous commissioning currently underway for the Air-Conditioning & Refrigeration Technology Institute (ARTI). The project focuses on developing methods for automating parts of the commissioning of heating, ventilating and air-conditioning (HVAC) equipment in newly-built, as well as existing, commercial buildings. This paper provides a summary of work completed to date, which has focused on selecting building systems; operation problems; and parts of the commissioning process where automation is likely to provide the greatest benefits. It also includes an overview of the approach planned for development and demonstration of methods for automating the selected areas.

  3. Multiplicity Counting

    SciTech Connect (OSTI)

    Geist, William H.

    2015-12-01

    This set of slides begins by giving background and a review of neutron counting; three attributes of a verification item are discussed: 240Pueff mass; α, the ratio of (α,n) neutrons to spontaneous fission neutrons; and leakage multiplication. It then takes up neutron detector systems – theory & concepts (coincidence counting, moderation, die-away time); detector systems – some important details (deadtime, corrections); introduction to multiplicity counting; multiplicity electronics and example distributions; singles, doubles, and triples from measured multiplicity distributions; and the point model: multiplicity mathematics.

  4. The Atomic Energy Commission By Alice Buck

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atomic Energy Commission By Alice Buck July 1983 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction Almost a year after World War II ended, Congress established the United States Atomic Energy Commission to foster and control the peacetime development of atomic science and technology. Reflecting America's postwar optimism, Congress declared that atomic energy should be employed not only in the Nation's

  5. MICROBOONE CRYOGENICS: INSTALLATION AND COMMISSIONING Ben Carls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRYOGENICS: INSTALLATION AND COMMISSIONING Ben Carls Fermilab 1 B. Carls, Fermilab MicroBooNE Cryogenics Outline * Requirements for MicroBooNE * Basic operation of a LAr cryogenics system * The commissioning and operation of MicroBooNE Phase I - A stripped down version of the full purification system * The remaining construction needed for Phase II - The full MicroBooNE cryogenics system needed for operation of the detector 2 B. Carls, Fermilab MicroBooNE Cryogenics System Requirements * Liquid

  6. Commissioning Guidance for ESPCs | Department of Energy

    Office of Environmental Management (EM)

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. PDF icon ph3_cx_guide_23.pdf More Documents & Publications Investment-Grade Audit Kickoff Meeting Sample Agenda FEMP Comprehensive ESPC Workshop Presentations Using ENABLE in

  7. EVALUATION REPORT The Federal Energy Regulatory Commission's

    Office of Environmental Management (EM)

    Federal Energy Regulatory Commission's Unclassified Cybersecurity Program - 2014 OAS-L-15-03 November 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 3, 2014 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal

  8. MARCH 24, 2015 LAB COMMISSION MEETING MINUTES | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its seventh meeting at 10:30 AM on March 24, 2015. Commission Co-Chair TJ...

  9. FEBRUARY 24, 2015 LAB COMMISSION MEETING MINUTES | Department...

    Broader source: Energy.gov (indexed) [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its sixth meeting at 9:00 AM on February 24, 2015. Commission Co-Chair...

  10. ENERGY STAR Guide to Retro-Commissioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR Guide to Retro-Commissioning ENERGY STAR Guide to Retro-Commissioning This document gives an overview of RCx and provides detailed project guidance. ENERGY STAR Guide to Retro-Commissioning More Documents & Publications Including Retro-Commissioning in Federal Energy Savings Performance Contracts Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning Sensor Suitcase Fact Sheet

  11. July 18, 2014 Commission Meeting Minutes | Department of Energy

    Office of Environmental Management (EM)

    July 18, 2014 Commission Meeting Minutes July 18, 2014 Commission Meeting Minutes This meeting was the inaugural meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Secretary Moniz and Co-Chairs TJ Glauthier and Jared Cohon. The next agenda item was the charge from the joint Appropriations Staff - Subcommittee on Energy and Water Development to the Commission. Dimitri Kusnezov briefed the

  12. Public Utility Commission of Texas | Open Energy Information

    Open Energy Info (EERE)

    Public Utility Commission of Texas Name: Public Utility Commission of Texas Address: 1701 N. Congress Avenue Place: Austin, Texas Zip: 78701 Year Founded: 1975 Website:...

  13. New Mexico Public Regulation Commission | Open Energy Information

    Open Energy Info (EERE)

    Public Regulation Commission Name: New Mexico Public Regulation Commission Address: 33 Plaza La Prensa Place: Santa Fe, New Mexico Zip: 87507 Website: www.nmprc.state.nm.us...

  14. Ex Parte Meeting between DOE and California Energy Commission...

    Broader source: Energy.gov (indexed) [DOE]

    California Energy Commission (Energy Commission) expressed concern about the differences in the stringency of California standards and the proposed DOE standards. The Energy...

  15. Design and Commissioning of a Wind Tunnel for Integrated Physical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commissioning of a Wind Tunnel for Integrated Physical and Chemical Measurements of PM Dispersing Plume of Heavy Duty Diesel Truck Design and Commissioning of a Wind Tunnel for ...

  16. Commission to Review the Effectiveness of the National Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Energy Laboratories, Phase II Meeting Schedule Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule The Commission meets ...

  17. Guidelines and Checklist for Commissioning and Government Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE...

  18. Retro-Commissioning for State and Local Governments

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how state and local governments can lead by example by retro-commissioning their own buildings and adopting retro-commissioning policies for the private sector.

  19. Oklahoma Corporate Commission Oil and Gas | Open Energy Information

    Open Energy Info (EERE)

    Corporate Commission Oil and Gas Jump to: navigation, search Name: Oklahoma Corporate Commission Oil and Gas Place: Oklahoma Zip: 73152-2000 Website: www.occeweb.comogoghome.htm...

  20. Wyoming Oil and Gas Conservation Commission | Open Energy Information

    Open Energy Info (EERE)

    Oil and Gas Conservation Commission Jump to: navigation, search Name: Wyoming Oil and Gas Conservation Commission Address: 2211 King Blvd Place: Wyoming Zip: 82602 Website:...

  1. Guernsey Renewable Energy Commission GREC | Open Energy Information

    Open Energy Info (EERE)

    Renewable Energy Commission GREC Jump to: navigation, search Name: Guernsey Renewable Energy Commission (GREC) Place: St. Martin, Guernsey, Channel Islands, United Kingdom Zip: GY1...

  2. Arkansas Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    Oil and Gas Commission Jump to: navigation, search Name: Arkansas Oil and Gas Commission Address: 301 Natural Resources Dr. Ste 102 Place: Arkansas Zip: 72205 Website:...

  3. Philippines-Support for the National Climate Commission | Open...

    Open Energy Info (EERE)

    Philippines-Support for the National Climate Commission Jump to: navigation, search Name GIZ-Philippines-Support for the National Climate Commission AgencyCompany Organization...

  4. Philippines-Support for the National Climate Commission | Open...

    Open Energy Info (EERE)

    Philippines-Support for the National Climate Commission (Redirected from GIZ-Philippines-Support for the National Climate Commission) Jump to: navigation, search Name...

  5. Memorandum on the Interim Report of the Commission to Review...

    Office of Environmental Management (EM)

    the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Memorandum on the Interim Report of the Commission to Review the Effectiveness...

  6. San Francisco Bay Conservation and Development Commission | Open...

    Open Energy Info (EERE)

    Conservation and Development Commission Jump to: navigation, search Logo: San Francisco Bay Conservation and Development Commission Name: San Francisco Bay Conservation and...

  7. Retro-Commissioning Sensor Suitcase Fact Sheet | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro-Commissioning Sensor Suitcase Fact Sheet Retro-Commissioning Sensor Suitcase Fact Sheet Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory...

  8. Public Service Commission of Wisconsin | Open Energy Information

    Open Energy Info (EERE)

    Commission of Wisconsin Jump to: navigation, search Name: Public Service Commission of Wisconsin Address: 610 North Whitney Way Place: Madison, Wisconsin Zip: 53707-7854 Phone...

  9. Kansas Corporation Commission Energy Division | Open Energy Informatio...

    Open Energy Info (EERE)

    Commission Energy Division Jump to: navigation, search Name: Kansas Corporation Commission Energy Division Address: 1500 SW Arrowhead Road Place: Topeka, KS Zip: 66604-4074 Phone...

  10. Arizona Const. Art.15 - The Corporation Commission | Open Energy...

    Open Energy Info (EERE)

    Arizona Const. Art.15 - The Corporation CommissionLegal Abstract This article sets forth the Constitutional provisions governing the Arizona Corporations Commission. Published...

  11. File:07FDBPlantCommissioning.pdf | Open Energy Information

    Open Energy Info (EERE)

    FDBPlantCommissioning.pdf Jump to: navigation, search File File history File usage Metadata File:07FDBPlantCommissioning.pdf Size of this preview: 463 599 pixels. Other...

  12. File:07CAAPlantCommissioningProcessApplicationForCertification...

    Open Energy Info (EERE)

    7CAAPlantCommissioningProcessApplicationForCertification.pdf Jump to: navigation, search File File history File usage Metadata File:07CAAPlantCommissioningProcessApplicationForCert...

  13. File:07ORDExpeditedPlantCommissioningProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    ORDExpeditedPlantCommissioningProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07ORDExpeditedPlantCommissioningProcess.pdf Size of this preview:...

  14. Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...

    National Nuclear Security Administration (NNSA)

    Blog Home About Us Our History NNSA Timeline Atomic Energy Commission Explores Peaceful Uses of ... Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions ...

  15. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  16. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  17. NUCLEAR REGULATORY,.COMMISSION REGION I

    Office of Legacy Management (LM)

    REGULATORY,.COMMISSION REGION I lY,.COMMISSION 475 ALLENDALE ROAD KlNG OF PRUSSIA. PENNSYLVANIA 194061415 GION I NOALE ROAD ENNSYLVANlA 194061415 MAY I5 1996 MAY I5 1996 Docket No. 040-07964 License No. SlJ (Rs Heyman Properties Attention: Mr. John S. Russo Facility Manager 333 Post Road West Westport, CT 06881 SUBJECT: INSPECTION NO. 040-07964/96-001 Dear Mr. Russo: On April 15, 1996, Todd J. Jackson of this office conducted a routine inspection at 737 Canal Street, Stamford, Connecticut of

  18. PP-03 Federal Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    03 Federal Power Commission PP-03 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PDF icon PP-03 Federal Power Commission More Documents & Publications PP-35 Trico Electric Cooperative Inc PP-285 Sharyland Utilities LP PP-107-1 Arizona Public Service Company

  19. PP-13 Federal Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-13 Federal Power Commission More Documents & Publications PP-230-3 International Transmission Company PP-18 Glacier Electric Cooperative, Inc PP-23 Netley Corporation

  20. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  1. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  2. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    Functional organization charts for the NRC Commission Offices, Divisions, Staffs and Branches are presented.

  3. Potential Benefits of Commissioning California Homes

    SciTech Connect (OSTI)

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

  4. April 22, 2015 Lab Commission Meeting Minutes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 22, 2015 Lab Commission Meeting Minutes April 22, 2015 Lab Commission Meeting Minutes The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its eighth meeting at 9:45 AM on April 22, 2015. Commission Co-Chair Jared Cohon led the meeting, which included discussion on cost savings through the Y-12/Pantex consolidation; budget atomization; and both NLDC and DOE perspectives on budget, accounting, and cost-saving initiatives. The

  5. Checkout, Testing, and Commissioning Plan RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Checkout, Testing, and Commissioning Plan RM Checkout, Testing, and Commissioning Plan RM The CP RM Module is a tool that assists DOE federal project review teams in evaluating the sufficiency of the Commissioning Plan and its implementation. The CP RM can be used by the DOE federal project teams both to evaluate the adequacy of the Commissioning Plan documentation/programs and the execution of programs by the contractor. PDF icon Commissioning Plan RM More Documents & Publications

  6. November 4, 2014 LAB COMMISSION MEETING MINUTES | Department of Energy

    Energy Savers [EERE]

    November 4, 2014 LAB COMMISSION MEETING MINUTES November 4, 2014 LAB COMMISSION MEETING MINUTES The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its fourth meeting at 9:00 AM on November 4, 2014. The meeting included three panels: directors of ANL and FermiLab, industry partners, and university partners. Each panel consisted of testimony from the panelists followed by discussion with the commission. The lab directors gave an overview of

  7. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect (OSTI)

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJITs Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: Online classes are self-paced, and can be completed anywhere, any time Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual lessons, followed by a 24 hour hands-on lab. Total time required is between 50 and 70 hours, depending on the pace of the independent learner. Individual courses can be taken for continuing education credits. Assessments are included for each course, and a score of at least 80% is required for completion. Completion of Modules 1 through 3 is prerequisite for participating in the laboratory. More experienced participants have the option to test out of Modules 1 and 2 and complete Module 3 to progress to the laboratory.

  8. Ethylene plant commissioned at Corpus Christi

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    Ethylene Plant Commissioned at Corpus Christi. Corpus Christi Petrochemical Co. has commissioned its $600 million ethylene plant at Corpus Christi, Tex. Plant capacities include 1.2 billion lb/yr of ethylene, 560 million lb/yr of propylene, 400 million lb/yr of crude butadiene mixture, 60 million gal of benzene, 45 million gal of gasoline blending components, and 50 million gal of fuel oils. The ethylene and propylene will be transported by pipeline to Houston for further processing. At the Corpus Christi facilities, process pressures range from full vacuum to 1800 psig, and process temperatures range from -260/sup 0/ to +1600/sup 0/F. The plant uses gas oil and naphtha as feedstock, but also has some flexibility to use ethane or LPG as feedstock. Stone and Webster Engineering Corp. engineered and Brown and Root Inc. built the plant.

  9. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect (OSTI)

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  10. A History of the Atomic Energy Commission

    DOE R&D Accomplishments [OSTI]

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  11. Sandia Contributes to International Electrotechnical Commission IEC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    61400-26 Availability Standard Contributes to International Electrotechnical Commission IEC 61400-26 Availability Standard - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power &

  12. COMMISSIONING OF THE RELATIVISTIC HEAVY ION COLLIDER.

    SciTech Connect (OSTI)

    TRBOJEVIC,D.; AHRENS,L.; BLASKIEWICZ,M.; BRENNAN,M.; BAI,M.; CAMERON,P.; CARDONA,J.; CONNOLLY,R.; ET AL; TSOUPAS,N.; VAN ZEIJTS,J.

    2001-06-18

    This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supplies connections by the beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results; like Schottky detector, beam profile monitor, beam position monitors, tune meter and others, are shown [1].

  13. Moving closer to the Atomic Energy Commission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    closer to the Atomic Energy Commission Last week we examined some events in Oak Ridge resulting from the struggle for control of atomic weapons. There was also a transition period and struggle within President Truman's cabinet regarding the same issue of control over this genie that was now out of the bottle. Meanwhile, on an international level there was a huge debate raging regarding international control of the atomic bomb. Primary nations included in the debate were the United States,

  14. Notices Safety Commission, 4330 East West

    National Nuclear Security Administration (NNSA)

    20 Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504-7923. Dated: January 10, 2012. Todd A Stevenson, Secretary. [FR Doc. 2012-625 Filed 1-10-12; 4:15 pm] BILLING CODE 6355-01-P CORPORATION FOR NATIONAL AND COMMUNITY SERVICE Information Collection; Submission for OMB Review, Comment Request AGENCY: Corporation for National and Community Service. ACTION: Notice. SUMMARY: The Corporation for National

  15. December 15, 2014 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its fifth meeting at 10:00 AM on December 15, 2014. Commission Co-Chair Jared Cohon led the meeting. The meeting included two panels: (1) authors of recent reports about the DOE National Labs and (2) a national lab contractor panel. The report authors summarized their respective reports, highlighting concerns related to the relationship between DOE and the labs, research funding and strategy stove-piping, weak links between the labs and market, an inconsistent economic development mission, the difficulty small firms have in accessing labs, the labs’ lack of regional engagement, and DOE and congressional micromanagement of the labs. The lab contractor representatives responded to questions posed by the commissioners related to lab management and the relationship with DOE. Additionally, Patricia Falcone spoke of the important role of the labs in the science and technology enterprise and Alan Leshner talked about the labs and their relationship with the scientific community. Christopher Paine presented his views on transforming the weapons complex. The next meeting will be held February 24 at the Hilton at Mark Center in VA.

  16. Practical Diagnostics for Evaluating Residential Commissioning Metrics

    SciTech Connect (OSTI)

    Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

    2002-06-11

    In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

  17. Investigation of the persistence of new building commissioning

    SciTech Connect (OSTI)

    Potter, Amanda; Friedman, Hannah; Haasl, Tudi; Claridge, David

    2002-03-17

    Commissioning is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and cost-effectiveness of commissioning projects depends on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of commissioning benefits was recently studied in a PIER project evaluating ten buildings that were commissioned at building start-up at least two years ago. The researchers examined the commissioning reports, control algorithms, EMCS point measurements, and energy use data, and conducted operator and commissioning provider interviews to investigate the persistence of commissioning benefits. In addition, they conducted site visits in a sample of the buildings. A set of commissioning measures was selected for each building to compare the persistence of benefits. Persistence was measured both qualitatively through a discussion of occupant comfort and decreased maintenance and quantitatively through estimations of energy savings. This paper reports the results of the study. The discussion includes how well the benefits of commissioning persisted over time, reasons for declining performance, and methods for improving persistence. The results provide valuable insight into how to estimate the persistence of commissioning information central to the cost benefit analyses routinely performed for commissioning measures.

  18. Winning the Future: Navajo-Hopi Land Commission Leverages DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Navajo-Hopi Land Commission Leverages DOE Grant to Advance Solar Ranch Project Winning the Future: Navajo-Hopi Land Commission Leverages DOE Grant to Advance Solar Ranch Project ...

  19. Example Retro-Commissioning Scope of Work to Include Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC...

  20. NMS 4-57 County Planning Commissions | Open Energy Information

    Open Energy Info (EERE)

    4-57 County Planning Commissions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NMS 4-57 County Planning CommissionsLegal...

  1. Comments of the District of Columbia Public Service Commission...

    Energy Savers [EERE]

    Comments of the District of Columbia Public Service Commission Comments of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-06-1,...

  2. The International Heat Flow Commission | Open Energy Information

    Open Energy Info (EERE)

    International Heat Flow Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: The International Heat Flow Commission Authors A. E. Beck and...

  3. Atomic Energy Commission : Atomic Power at Shippingport - 1958 Educational Film

    SciTech Connect (OSTI)

    2013-02-02

    The United States Atomic Energy Commission & Westinghouse Electric Company take us on a tour of an atomic power station.

  4. Retro-Commissioning Increases Data Center Efficiency at Low Cost |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Retro-Commissioning Increases Data Center Efficiency at Low Cost Retro-Commissioning Increases Data Center Efficiency at Low Cost Fact sheet discusses a success story detailing a retro-commissioning project at the Department of Energy's Savannah River Site to increase data center energy efficiency at low costs. PDF icon datacenter_savannah.pdf More Documents & Publications Including Retro-Commissioning in Federal Energy Savings Performance Contracts Energy Audit and

  5. PP-54 Ontario Hydro Electric Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-54 Ontario Hydro Electric Power Commission More Documents & Publications PP-369 British Columbia Hydro and Power Authority PP-64 Basin Electric Power Cooperative PP-61 Minnkota Power Cooperative (MPC)

  6. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  7. Secretary Moniz Announces Members to New Commission on National Labs |

    Energy Savers [EERE]

    Department of Energy Members to New Commission on National Labs Secretary Moniz Announces Members to New Commission on National Labs May 20, 2014 - 12:28pm Addthis NEWS MEDIA CONTACT (202) 586-4940 Commission to Review the Effectiveness of the Energy Department's National Laboratories WASHINGTON - Today, Energy Secretary Ernest Moniz announced the Commission to Review the Effectiveness of the National Energy Laboratories, a congressionally-mandated committee that will evaluate the

  8. US Nuclear Regulatory Commission functional organization charts, January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  9. Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit

    Office of Environmental Management (EM)

    (4/93) United States Government Department of Energy Memorandum DATE: November 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related

  10. Opening Remarks, California Energy Commission Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    N Hydrogen Energy Storage For Grid and Transportation Services Fernando Pina, Manager Energy Research and Development Division Jim McKinney, Manager Fuels and Transportation Division California Energy Commission May 14, 2014 1 C A L I F O R N I A E N E R G Y C O M M I S S I O N * Introduction * Energy Policy * Energy Storage - Challenges and Opportunities * Alternative and Renewable Fuel and Vehicle Technology Investment in Hydrogen Fueling Stations & EPIC Program * Questions Purpose 2 C A L

  11. NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

    Office of Legacy Management (LM)

    REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 2 2 1982 -/ Departmznt'of Ene,rgy ATTN : Dr. William E. Mott, Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. Mott: Enclosed is the list of contaminated'or potentially contaminated sites that I promised to send you during our recent meeting. The sites have been broken down into the followi,ng four categories: 1. Sites with known contamination that have never been 1 icensed. 2. Formerly licensed sites

  12. A History of the Atomic Energy Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atomic Energy Commission A History of the Atomic Energy Commission A History of the Atomic Energy Commission - written by Alice L. Buck Washington, D.C.: U.S. Department of Energy, July 1983. 41 pp. PDF icon AEC History.pdf More Documents & Publications The History of Nuclear Energy The Manhattan Project Hewlett and Holl - Atoms for Peace and War

  13. MINER{nu}A Test Beam Commissioning

    SciTech Connect (OSTI)

    Higuera, A.; Castorena, J.; Urrutia, Z.; Felix, J.; Zavala, G.

    2009-12-17

    MINER{nu}A Main INjector ExpeRiment {nu}-A is a high-statistic neutrino scattering experiment that will ran in the NuMI Beam Hall at Fermilab. To calibrate the energy response of the MINER{nu}A detector, a beamline is being designed for the MINER{nu}A Test Beam Detector (TBD). The TBD is a replica of the full MINER{nu}A detector at small scale for calibration studies of the main detector. The beamline design consists of the following parts: a copper target, used to generate tertiaries from an incoming secondary beam; a steel collimator for tertiaries, which also serves as a dump for the incoming beam; a time of fight system (scintillator planes); four wire chambers, for angle measurements and tracking; and two dipole magnets, used as an spectrometer. During last October, the first commissioning run of the MINER{nu}A Test Beam took place in the Meson Test Beam Facility at Fermilab. We commissioned the target and collimator of the new tertiary beamline.

  14. INITIAL COMMISSIONING OF NDCX-II

    SciTech Connect (OSTI)

    Lidia, S.; Arbelaez, D.; Greenway, W.; Jung, J. -Y.; Kwan, J.; Lipton, T.; Pekedis, A.; Roy, P.; Seidl, P.; Takakuwa, J.; Waldron, W.; Friedman, A.; Grote, D.; Sharp, W.; Gilson, E.

    2012-05-15

    The Neutralized Drift Compression Experiment-II (NDCX-II) will generate ion beam pulses for studies of Warm Dense Matter and heavy-ion-driven Inertial Fusion Energy. The machine will accelerate 20-50 nC of Li+ to 1.2-3 MeV energy, starting from a 10.9-cm alumino-silicate ion source. At the end of the accelerator the ions are focused to a sub-mm spot size onto a thin foil (planar) target. The pulse duration is compressed from ~;;500 ns at the source to sub-ns at the target following beam transport in a neutralizing plasma. We first describe the injector, accelerator, transport, final focus and diagnostic facilities. We then report on the results of early commissioning studies that characterize beam quality and beam transport, acceleration waveform shaping and beam current evolution. We present simulation results to benchmark against the experimental measurements.

  15. Building geothermal research and development partnerships: The California Energy Commission`s geothermal program

    SciTech Connect (OSTI)

    Hare, R.; Tiangco, V.; Birkinshaw, K.; Johannis, M.

    1995-12-31

    The California Energy Commission`s Geothermal Program (Assembly Bill 1905, Bosco) has built cost-shared Research, Development and Demonstration (RD&D) partnerships with over 150 public and private entities. The Geothermal Program promotes the development of new geothermal resources and technologies for both direct-use and electricity generation while protecting the environment and promoting energy independence. This is accomplished by providing financial and technical assistance in the form of contingent awards which, depending on project success, can become either a loan or a grant. Some of the cost-shared RD&D accomplishments are presented. The process and requirements to obtain financial assistance through the Geothermal Program are summarized.

  16. EFCOG Best Practice Submission - Guidance for Retro-Commissioning

    SciTech Connect (OSTI)

    Ernest L. Fossum, CEM

    2006-01-01

    Commissioning is slowly becoming an accepted quality method for ensuring that buildings are designed, constructed, and operated as required by the building owner and as intended by the original design. Retro-commissioning is a process, using commissioning concepts, to ensure that existing buildings are operated and maintained as required by the owner to meet the buildings current mission. Retro-commissioning further seeks to incorporate new equipment and operating practices to upgrade existing facilities to obtain increased efficiency and employee comfort and productivity. Retro-commissioning practices are not universal. Best practices have been identified to assist Federal organizations with the development of retro-commissioning programs and to help DOE sites to begin this quality related process.

  17. Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  18. Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Blue Ribbon Commission on America's Nuclear Future Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future January 29, 2010 - 12:00am Addthis Washington, D.C. - As part of the Obama Administration's commitment to restarting America's nuclear industry, U.S. Secretary of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to provide recommendations for developing a safe, long-term solution to managing

  19. Ex parte communication of the California Energy Commission- Docket No.

    Energy Savers [EERE]

    EERE-2008-BT-STD-0005 | Department of Energy parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 On January 6, 2011, Mike Leaon, Harinder Singh, Ken Rider, and Dennis Beck of the California Energy Commission (CEC) had a telephone conversation with Victor Petrolati of DOE regarding the above referenced proceeding, concerning energy conservation standards for

  20. Department of Energy and Nuclear Regulatory Commission Increase Cooperation

    Energy Savers [EERE]

    to Advance Global Nuclear Energy Partnership | Department of Energy Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP)

  1. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  2. National Labs Commission Phase I Meeting Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Labs Commission Phase I Meeting Schedule National Labs Commission Phase I Meeting Schedule The Commission meets monthly to gather information that will inform its study. Public meetings allow for public participation. Individuals who would like to attend must RSVP to Karen Gibson, Designated Federal Officer (DFO), no later than two business days preceding the meeting date at email crenel@hq.doe.gov. Please provide your name, organization, and contact information. Individuals and

  3. Energy Department and French Commission on Atomic Energy and Alternative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energies Sign New Research and Development Agreement | Department of Energy Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement June 28, 2012 - 1:04pm Addthis Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Washington,

  4. Commissioning of CHP Systems - White Paper, April 2008 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Commissioning of CHP Systems - White Paper, April 2008 Commissioning of CHP Systems - White Paper, April 2008 This 2008 white paper explores commissioning practices of Combined Heat and Power (CHP) systems applied within the built environment. CHP systems are more complex involving increased attention to atmospheric emissions and electric grid interconnection and sophisticated control logic. This paper details four example case studies. A San Francisco hotel was retrofitted with a

  5. CHP Assessment, California Energy Commission, October 2009 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Assessment, California Energy Commission, October 2009 CHP Assessment, California Energy Commission, October 2009 This California Energy Commission report quantifies the long-term market penetration potential for combined heat and power (CHP) and the degree to which CHP can reduce potential greenhouse gas (GHG1) emissions in support of the California Global Warming Solutions Act of 2006 (AB 32) (Assembly Bill 32, Núñez, Chapter 488, Statutes of 2006). The report also examines how

  6. Secretary Chu Announces Blue Ribbon Commission on America's Nuclear

    Energy Savers [EERE]

    Future | Department of Energy Blue Ribbon Commission on America's Nuclear Future Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future January 29, 2010 - 12:57pm Addthis As part of the Obama Administration's commitment to restarting America's nuclear industry, U.S. Secretary of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to provide recommendations for developing a safe, long-term solution to managing the

  7. Notices ELECTION ASSISTANCE COMMISSION Publication of EAC Decision Regarding

    Energy Savers [EERE]

    439 Federal Register / Vol. 79, No. 26 / Friday, February 7, 2014 / Notices ELECTION ASSISTANCE COMMISSION Publication of EAC Decision Regarding State Requests To Include Additional Proof-of-Citizenship Instructions on the National Mail Voter Registration Form AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice. SUMMARY: The U.S. Election Assistance Commission (EAC) hereby causes to be published in the Federal Register this notice in reference to the Memorandum Of Decision

  8. Blue Ribbon Commission on America's Nuclear Future Charter | Department of

    Energy Savers [EERE]

    Energy Blue Ribbon Commission on America's Nuclear Future Charter Blue Ribbon Commission on America's Nuclear Future Charter March 2, 2010 - 12:00am Addthis The Secretary of Energy, acting at the direction of the President, is establishing the Commission to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, including all alternatives for the storage, processing, and disposal of civilian and defense used nuclear fuel, high-level waste, and

  9. Including Retro-Commissioning in Federal Energy Savings Performance

    Energy Savers [EERE]

    Contracts | Department of Energy Including Retro-Commissioning in Federal Energy Savings Performance Contracts Including Retro-Commissioning in Federal Energy Savings Performance Contracts Document describes guidance on the importance of (and steps to) including retro-commissioning in federal energy savings performance contracts (ESPCs). PDF icon 11_2_includingretrocommissioning.pdf More Documents & Publications Enabling Mass-Scale Financing for Federal Energy, Water, and Sustainability

  10. Portland Community College Celebrates Commissioning of Combined Heat and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Fuel Cell System | Department of Energy Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel Cell System Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel Cell System October 3, 2011 - 4:43pm Addthis U.S. Energy Secretary Steven Chu today applauded the commissioning of a combined heat and power (CHP) fuel cell system at Portland Community College in Oregon. The CHP fuel cell system will help Portland Community College

  11. Idaho Public Utilities Commission Approves Neal Hot Springs Power...

    Open Energy Info (EERE)

    Geothermal Area Regions (0) Retrieved from "http:en.openei.orgwindex.php?titleIdahoPublicUtilitiesCommissionApprovesNealHotSpringsPowerPurchaseAgreement&oldid76143...

  12. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Energy Savers [EERE]

    Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the...

  13. Hawaii Department of Land and Natural Resources Commission on...

    Open Energy Info (EERE)

    on Water Resource Management Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Commission on Water Resource Management Address: Kalanimoku...

  14. Hawaii Commission on Water Resource Management Webpage | Open...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Hawaii Commission on Water Resource Management Webpage Citation State of...

  15. The Commission on Environmental Markets and Economic Performance...

    Open Energy Info (EERE)

    on Environmental Markets and Economic Performance CEMEP Jump to: navigation, search Name: The Commission on Environmental Markets and Economic Performance (CEMEP) Place: United...

  16. United Nations Economic Commission for Latin America and the...

    Open Energy Info (EERE)

    In June 1951, the Commission established the ECLAC subregional headquarters in Mexico City, which serves the needs of the Central American subregion, and in December...

  17. Orlando Utilities Commission- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Orlando Utilities Commission (OUC) offers rebates on a variety of energy efficient improvements for residential customers. Customers should view the program brochure on the web site listed above...

  18. Automated Proactive Techniques for Commissioning Air-Handling Units

    SciTech Connect (OSTI)

    Katipamula, Srinivas ); Brambley, Michael R. ); Luskay, Larry

    2003-08-30

    Many buildings today use sophisticated building automation systems (BASs) to manage a wide and varied range of building systems. Although the capabilities of the BASs seem to have increased over time, many buildings still are not properly commissioned, operated or maintained. Lack of or improper commissioning, the inability of the building operators to grasp the complex controls, and lack of proper maintenance leads to inefficient operations and reduced lifetimes of the equipment. If regularly scheduled manual maintenance or re-commissioning practices are adopted, they can be expensive and time consuming. Automated proactive commissioning and diagnostic technologies address two of the main barriers to commissioning: cost and schedules. Automated proactive continuous commissioning tools can reduce both the cost and time associated with commissioning, as well as enhance the persistence of commissioning fixes. In the long run, automation even offers the potential for automatically correcting problems by reconfiguring controls or changing control algorithms dynamically. This paper will discuss procedures and processes that can be used to automate and continuously commission the economizer operation and outdoor-air ventilation systems of an air-handling unit.

  19. Commissioning: A Highly Cost-Effective Building Energy Management Strategy

    SciTech Connect (OSTI)

    Mills, Evan

    2011-01-06

    Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

  20. Retro-Commissioning for Regulators of Ratepayer-Funded Programs

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how customer usage data can help promote the adoption of retro-commissioning polices for public and private commercial buildings.

  1. Interim Report of the Commission to Review the Effectiveness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Interim Report presents the preliminary observations and recommendations gleaned from Phase I of the study by the Commission to Review the Effectiveness of the National Energy ...

  2. Railroad Commission of Texas, Oil and Gas Division | Open Energy...

    Open Energy Info (EERE)

    Texas, Oil and Gas Division Jump to: navigation, search Name: Texas Railroad Commission, Oil and Gas Division Address: 1701 N. Congress Place: Texas Zip: 78711-2967 Website:...

  3. Oregon Land Conservation and Development Commission | Open Energy...

    Open Energy Info (EERE)

    Commission Abbreviation: LCDC Place: Portland, Oregon Website: www.oregon.govLCDpageslcdc. References: Oregon Department of Land Conservation and Development1 This...

  4. DEPARTMENT OF ENERGY CHARTER FOR THE COMMISSION TO REVIEW THE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Staff Years . The estimated annual operating cost of direct support to, including travel of, the Commission and its subcommittees is 2,000,000 and requires approximately...

  5. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MDDC 869 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE DIFFRACTION OF NEUTRONS BY CRYSTALLINE POWDERS by E. 0. Wollan C. G. Shull Clinton Laboratories Published...

  6. Including Retro-Commissioning in Federal Energy Savings Performance...

    Energy Savers [EERE]

    More Documents & Publications Enabling Mass-Scale Financing for Federal Energy, Water, and Sustainability Projects Retro-Commissioning Increases Data Center...

  7. Department of Energy Commends the Nuclear Regulatory Commission...

    Broader source: Energy.gov (indexed) [DOE]

    today applauded the Nuclear Regulatory Commission's (NRC) decision to approve an Early Site Permit (ESP) for the Entergy Corporation's Grand Gulf Nuclear Station in Mississippi. ...

  8. Sandia Energy - Sandia-AREVA Commission Solar Thermal/Molten...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia-AREVA Commission Solar ThermalMolten Salt Energy-Storage Demonstration Home Renewable Energy Energy Facilities Partnership Capabilities News SunShot News & Events...

  9. Chapter 2 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    2 of the Wyoming Public Service Commission Regulations: General Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  10. 2 CCR State Lands Commission Article 1, General Provisions |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 2 CCR State Lands Commission Article 1, General ProvisionsLegal Abstract California...

  11. Chapter 1 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    of the Wyoming Public Service Commission Regulations: Rules of Practice and Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  12. Chapter 9 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    9 of the Wyoming Public Service Commission Regulations: General Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  13. ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for...

  14. Department of Energy and Nuclear Regulatory Commission Increase...

    Energy Savers [EERE]

    Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy ... GNEP seeks to expand the use of clean, affordable nuclear energy to meet the ...

  15. District of Columbia Public Service Commission. Docket No. EO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  16. Response of the District of Columbia Public Service Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Response of the District of Columbia Public Service Commission More ... Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan ...

  17. Atomic Energy Commission Takes Over Responsibility for all Atomic...

    National Nuclear Security Administration (NNSA)

    Takes Over Responsibility for all Atomic Energy Programs | National Nuclear Security ... Home About Us Our History NNSA Timeline Atomic Energy Commission Takes Over ...

  18. Public Utilities Commission General Order NO. 131-D | Open Energy...

    Open Energy Info (EERE)

    Public Utilities Commission General Order NO. 131-D Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Public Utilities...

  19. HYTEST Phase I Facility Commissioning and Modeling

    SciTech Connect (OSTI)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  20. AEgIS experiment commissioning at CERN

    SciTech Connect (OSTI)

    Krasnicky, D.; Aghion, S.; Amsler, C.; Ariga, A.; Ariga, T.; Ereditato, A.; Kawada, J.; Kimura, M.; Pistillo, C.; Scampoli, P.; Storey, J.; Belov, A. S.; Gninenko, S. N.; Bonomi, G.; Subieta Vasquez, M. A.; Braeunig, P.; Oberthaler, M. K.; Brusa, R. S.; Di Noto, L.; Mariazzi, S.; and others

    2013-03-19

    The AEgIS Experiment is an international collaboration based at CERN whose aim is to perform the first direct measurement of the gravitational acceleration g of antihydrogen in the gravitational field of the Earth. Cold antihydrogen will be produced with a pulsed charge exchange reaction in a cylindrical Penning trap where antiprotons will be cooled to 100mK. The cold antihydrogen will be produced in an excited Rydberg state and subsequently formed into a beam. The deflection of the antihydrogen beam will be measured by using Moire deflectometer gratings. After being approved in late 2008, AEgIS started taking data in a commissioning phase early 2012. This report presents an overview of the AEgIS experiment, describes its current status and shows the first measurements on antiproton catching and cooling in the 5 T Penning catching trap. We will also present details on the techniques needed for the 100mK antihydrogen production, such as pulsed positronium production and its excitation with lasers.

  1. Commissioning of the Varian TrueBeam linear accelerator: A multi-institutional study

    SciTech Connect (OSTI)

    Glide-Hurst, C.; Bellon, M.; Wen, N.; Zhao, B.; Chetty, I. J.; Foster, R.; Speiser, M.; Solberg, T.; Altunbas, C.; Westerly, D.; Miften, M.; Altman, M.

    2013-03-15

    Purpose: Latest generation linear accelerators (linacs), i.e., TrueBeam (Varian Medical Systems, Palo Alto, CA) and its stereotactic counterpart, TrueBeam STx, have several unique features, including high-dose-rate flattening-filter-free (FFF) photon modes, reengineered electron modes with new scattering foil geometries, updated imaging hardware/software, and a novel control system. An evaluation of five TrueBeam linacs at three different institutions has been performed and this work reports on the commissioning experience. Methods: Acceptance and commissioning data were analyzed for five TrueBeam linacs equipped with 120 leaf (5 mm width) MLCs at three different institutions. Dosimetric data and mechanical parameters were compared. These included measurements of photon beam profiles (6X, 6XFFF, 10X, 10XFFF, 15X), photon and electron percent depth dose (PDD) curves (6, 9, 12 MeV), relative photon output factors (Scp), electron cone factors, mechanical isocenter accuracy, MLC transmission, and dosimetric leaf gap (DLG). End-to-end testing and IMRT commissioning were also conducted. Results: Gantry/collimator isocentricity measurements were similar (0.27-0.28 mm), with overall couch/gantry/collimator values of 0.46-0.68 mm across the three institutions. Dosimetric data showed good agreement between machines. The average MLC DLGs for 6, 10, and 15 MV photons were 1.33 {+-} 0.23, 1.57 {+-} 0.24, and 1.61 {+-} 0.26 mm, respectively. 6XFFF and 10XFFF modes had average DLGs of 1.16 {+-} 0.22 and 1.44 {+-} 0.30 mm, respectively. MLC transmission showed minimal variation across the three institutions, with the standard deviation <0.2% for all linacs. Photon and electron PDDs were comparable for all energies. 6, 10, and 15 MV photon beam quality, %dd(10){sub x} varied less than 0.3% for all linacs. Output factors (Scp) and electron cone factors agreed within 0.27%, on average; largest variations were observed for small field sizes (1.2% coefficient of variation, 10 MV, 2 Multiplication-Sign 2 cm{sup 2}) and small cone sizes (<1% coefficient of variation, 6 Multiplication-Sign 6 cm{sup 2} cone), respectively. Conclusions: Overall, excellent agreement was observed in TrueBeam commissioning data. This set of multi-institutional data can provide comparison data to others embarking on TrueBeam commissioning, ultimately improving the safety and quality of beam commissioning.

  2. Courts and Commissions: Fish or foul

    SciTech Connect (OSTI)

    Radford, B.W.

    1993-10-15

    Hydropower is under attack everywhere you look. It started back in the sixties during the battle over Arizona's Glen Canyon Dam. That case purportedly ended in a compromise with the Sierra Club to save the Grand Canyon from hydro development. But once built, the dam played havoc with Colorado River levels, disrupting rafting trips for Grand Canyon tourists. Even Barry Goldwater was later heard to rue the Glen Canyon project. Marc Reisner's 1986 book, Cadillac Desert, galvanized the antihydro faction. A few years later, calls arose for the City of San Francisco to dismantle its O'Shaughnessy Dam across the Hetch Hetchy Valley in the Sierra Nevada, just 15 miles north of famed Yosemite. That move failed. (Maybe San Francisco's oddball reputation had something to do with the result). But now we hear of plans underway to tear down dams on the Elwah River in Washington State's Olympic National Park, to reclaim lost salmon spawning grounds and return the parks to its natural state. This time the dam busters may win. These events are not unconnected. Strung together, they reveal a change in the popular opinion of how rivers, streams, and coastlines contribute to our economic well-being, and how the federal government should manage those economic resources. Federal hydropower control was born to govern our navigable waterways. It grew up as a tool to speed electrification and develop mining and logging. But forces today are seeking to make federal hydropower law more sympathetic to wildlife preservation. They argue that wildlife represents a national economic resource - no less so than timber, minerals, and shipping. This view is winning support from those in high positions, including the Chair of the Federal Energy Regulatory Commission, Elizabeth Moler.

  3. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  4. Retro-Commissioning Sensor Suitcase Commercialization Pilot Project |

    Energy Savers [EERE]

    Department of Energy Retro-Commissioning Sensor Suitcase Commercialization Pilot Project Retro-Commissioning Sensor Suitcase Commercialization Pilot Project The data module communicates wirelessly with the smart pad, which launches sensors during their installation. The data module communicates wirelessly with the smart pad, which launches sensors during their installation. Lead Performers: -- Pacific Northwest National Laboratory - Richland, WA -- Lawrence Berkeley National Laboratory -

  5. Status of the Commissioning of SOLEIL

    SciTech Connect (OSTI)

    Filhol, J. M.; Couprie, M. E.; Level, M. P.; Besson, J. C.; Brunelle, P.; Denard, J. C.; Godefroy, J. M.; Herbeaux, C.; Lebasque, P.; Le Roux, V.; Lestrade, A.; Loulergue, A.; Marchand, P.; Nadji, A.; Nadolski, L.; Nagaoka, R.; Pottin, B.; Tordeux, M. A.

    2007-01-19

    SOLEIL is a third generation Synchrotron radiation Source, under construction in France at St Aubin, near Paris. The Storage Ring consists in a 357 m circumference ring, with 16 cells and 24 straight sections (4x12m, 12x7m, 8x3.6m), out of which up to 21 will house insertion devices. The optics, with distributed dispersion, features a low 3.7 nm.rad emittance at the 2.75 GeV operating energy, so as to provide high brilliance, from the VUV up to the hard X ray domain. In order to provide a long lifetime, and beam position stabilities in the micron range, significant attention was paid at each design stage (optics, magnets, beam position monitors, vacuum and RF systems,..), including the design of the building and infrastructure, the construction of which is now complete. This resulted in some unprecedented approaches such as the intensive use of NEG coating Aluminium vessels, or the development of a dedicated superconducting RF cavity and of 190 kW solid state RF amplifiers. The construction, started in 2002, is now completed. The injector system (100 MeV Linac) and the 3 Hz full energy Booster synchrotron have reached nominal operating conditions by fall 2005. The installation of the Storage Ring was just completed and its commissioning started in May 2006. First 9 turns in the ring were achieved on May the 14th, and visible synchrotron radiation was also observed on a CCD camera. Innovative insertion devices were designed and built so as to provide the best possible performances in an energy range as large as 5 eV to 20 keV. These are helical electromagnetic devices with 640 mm and 256 mm periods, APPLE II type undulators with 80 mm period, and in-vacuum hybrid undulators with 20 mm period. Two infra-red beamlines providing both edge and constant dipole field emission are also under construction and a superconducting wiggler is currently being designed in order to provide high flux in the 10 to 50 keV range. A first set of 10 beamlines (out of 24 included in the project) is being built and will be tested from summer 2006 onwards, with the aim of starting Users operation by the beginning of 2007.

  6. Breach, Leach, and Transport-Multiple Species GRID

    Energy Science and Technology Software Center (OSTI)

    2006-04-01

    BLTMS-GRID is a FORTRAN code developed to facilitate specifications of a finite-element grid for the Nuclear Regulatory Commission code called Breach, Leach, and Transport - Multiple Species (BLT-MS). BLTMS-GRID is an open-source code. It functions under a DOS window.

  7. Breach, Leach, and Transport-Multiple Species UNCERT

    Energy Science and Technology Software Center (OSTI)

    2006-04-01

    BLTPLOT_UNCERT is a FORTRAN code developed to facilitate plotting of 2-D concentration data for the Nuclear Regulatory Commission code called Breach, Leach, and Transport - Multiple Species (BLT-MS). BLTPLOT_UNCERT is open-source code. It functions under a DOS window.

  8. Energy Praises the Nuclear Regulatory Commission Approval of the First

    Energy Savers [EERE]

    United States Nuclear Plant Site in Over 30 Years | Department of Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site

  9. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 23, 2015 | Department of Energy October 23, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015 October 23, 2015 - 8:44am Addthis Agenda Teleconference October 23, 2015 Minutes: The minutes of the meeting will be available on this webpage. 1:00 - 1:05 PM Introduction and Roll-Call Commission Co-chairs, T.J. Glauthier and Jared Cohon 1:05 - 1:15 PM Overview of Commission Draft Report Status T.J. Glauthier 1:15 - 1:30 PM Summary of Public

  10. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION TO INTERVENE AND COMMENT IN SUPPORT OF EMERGENCY PETITION AND COMPLAINT Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.211 and 385.214 (2004), Potomac Electric Power Company

  11. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION FOR LEAVE TO ANSWER AND ANSWER TO COMMENTS AND PROTESTS Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company ("Pepco")

  12. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) MOTION FOR LEAVE TO ANSWER AND ANSWER OF POTOMAC ELECTRIC POWER COMPANY Pursuant to Rule 213 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213, Potomac Electric Power Company ("Pepco") hereby moves for leave to answer and answers the Motion for Leave to File Consolidated Answer and Consolidated Answer of

  13. The Blue Ribbon Commission Offers Strong Step Forward | Department of

    Energy Savers [EERE]

    Energy Blue Ribbon Commission Offers Strong Step Forward The Blue Ribbon Commission Offers Strong Step Forward July 29, 2011 - 12:27pm Addthis Damien LaVera Damien LaVera Deputy Director, Office of Public Affairs Today, the Blue Ribbon Commission on America's Nuclear Future issued a draft of its recommendations. The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future. As part of our commitment to restarting the

  14. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Energy Savers [EERE]

    110 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-69-000] Acciona Wind Energy USA LLC v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on May 27, 2015, pursuant to section 206 of the Federal Power Act, U.S.C. 824(e) and Rule 206 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Acciona Wind Energy USA

  15. Energy Department Highlights Commissioning of Innovative Fuel Cell System

    Office of Environmental Management (EM)

    at U.S. Army's Aberdeen Proving Ground | Department of Energy Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground Energy Department Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground November 17, 2011 - 4:34pm Addthis The U.S. Department of Energy today recognized the commissioning of an innovative fuel cell system at the United States Army's Aberdeen Proving Ground in Maryland, which will supply the

  16. Role of the environmental management commission in North Carolina

    SciTech Connect (OSTI)

    Watkins, R.V. )

    1993-01-01

    The state of North Carolina's 17-member Environmental Management Commission is the principal regulatory and environmental policy-making body in the state for issues affecting water, air, and land resources. The author traces the evolution of environmental programs in the state, and the history of the Environmental Management Commission from its origin in 1927, and reviews the Commission's role, mission, structure, organization, function, and regulatory/public participation process. The state's environmental regulatory rulemaking process and established provisions against conflict of interest are also reviewed.

  17. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Environmental Management (EM)

    March 24, 2015 | Department of Energy Commission to Review the Effectiveness of the National Energy Laboratories, March 24, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, March 24, 2015 March 24, 2015 - 11:12am Addthis Agenda Magnolia Room (lobby level) Hilton Alexandria Mark Center Hotel 5000 Seminary Road, Alexandria, VA 22311 March 24, 2015 (Download Meeting Minutes) 10:30 - 10:35 AM Introduction Commission Co-chairs, T.J. Glauthier and Jared Cohon 10:35

  18. May 20 ESTAP Webinar: Commissioning Energy Storage | Department of Energy

    Office of Environmental Management (EM)

    ESTAP Webinar: Commissioning Energy Storage May 20 ESTAP Webinar: Commissioning Energy Storage May 14, 2014 - 1:31pm Addthis On Tuesday, May 20 from 1 - 2 p.m. ET, Clean Energy State Alliance will host a webinar on the process of commissioning an energy storage system. Speakers include Dr. Imre Gyuk, Energy Storage Program Manager in the Office of Electricity Delivery and Energy Reliability, as well as Dan Borneo from Sandia, Matt Galland from Sunpower, and Laurie B. Florence from UL. The

  19. Orlando Utilities Commission- Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Orlando Utilities Commission (OUC) offers rebates on a variety of energy efficient improvements for commercial customers. Customers should view the program brochure on the web site listed above for...

  20. Commission to Review the Effectiveness of the National Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1:15 - 1:30 PM Summary of Public Comments Received Susannah Howieson and Mark Taylor, Commission Staff Co-Directors, IDA Science and Technology Policy Institute 1:30 -...

  1. Remarks by Federal Blue Ribbon Commission J. David Jameson ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Blue Ribbon Commission J. David Jameson Atlanta, GA October 18, 2011 Good Morning. I am David Jameson. I am President and CEO of the Greater Aiken, South Carolina, Chamber...

  2. Public Utility Commission of Texas Substantive Rule 25.101...

    Open Energy Info (EERE)

    Texas Substantive Rule 25.101(b) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Public Utility Commission of Texas...

  3. Audit of the Federal Energy Regulatory Commission Leased Warehouse...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... was being used to store furniture and equipment that was no longer needed by the Commission. An additional 6,000 square feet of space was used to store office supplies instead ...

  4. Mississippi Public Service Commission Adopts Energy Efficiency Rules

    Broader source: Energy.gov [DOE]

    Mississippi Public Service Commission (PSC) approved new energy efficiency rules for electric and natural gas utility companies to offer customers several pathways to increase energy efficiency. According to the PSC, the rules could potentially s

  5. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    SciTech Connect (OSTI)

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  6. Sandia Energy - Stion Commissions PV System at Sandia Regional...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and the Sandia RTC site. Stion PV system installed and the Sandia RTC site. Thin-film solar module manufacturer Stion has commissioned a 12 kW fixed latitude ground-mounted...

  7. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  8. Nuclear Regulatory Commission Issuances. Volume 39, No. 2

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  9. NREL'S Morgan-Smith Honored by Martin Luther King Commission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ...Smith Honored by Martin Luther King Commission For more information contact: Sarah Holmes Barba, 303-275-3023 email: Sarah Barba Golden, Colo., Jan. 9, 2001 - Syl Morgan-Smith, ...

  10. Ex parte communication of the California Energy Commission- Docket...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE-2008-BT-STD-0005 On January 6, 2011, Mike Leaon, Harinder Singh, Ken Rider, and Dennis Beck of the California Energy Commission (CEC) had a telephone conversation with Victor ...

  11. Management Letter on the Federal Energy Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    We aim, however, to use our knowledge of the Commission's organization gained ... Ineffective Controls in Place over Management Review of Journal Entries Finding 13-FERC-JE-01 Status ...

  12. AUDIT REPORT Federal Energy Regulatory Commission's Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2015 Financial Statement Audit OAI-FS-16-02 November 2015 U.S. Department of ... Commission's Fiscal Year 2015 Financial Statement Audit" The attached report ...

  13. Task Force for Strategic Developments to Blue Ribbon Commission

    Office of Environmental Management (EM)

    Recommendations | Department of Energy Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the direction of the President to Secretary Chu and included leading experts. Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal. Detailed analysis, with eight major

  14. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: Energy.gov (indexed) [DOE]

    8 FERC ¶ 61,122 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, John R. Norris, Tony Clark, and Norman C. Bay. Plains and Eastern Clean Line LLC Plains and Eastern Clean Line Oklahoma LLC Docket No. ER14-2070-000 ORDER CONDITIONALLY AUTHORIZING PROPOSAL AND GRANTING WAIVERS (Issued August 14, 2014) 1. In this order, the Commission conditionally authorizes Plains and Eastern Clean Line LLC and Plains and Eastern

  15. Dr. Brian Kalk - Chairman North Dakota Public Service Commission.

    Broader source: Energy.gov (indexed) [DOE]

    Brian Kalk - Chairman North Dakota Public Service Commission. Responding to Changing Infrastructure Needs. I. Overview of the jurisdiction of the North Dakota Public Service Commission. a. Infrastructure siting b. Regulatory oversight c. States' rights II. Discuss the challenges to jurisdiction infrastructure. a. Electricity Transmission Lines b. Electricity Generation i. Wind ii. Natural Gas iii. Coal iv. Uncertainty c. Telecommunication Expansion d. Pipeline Operation & Safety III.

  16. ASTM PV INSTALLATON COMMISSIONING, OPERATIONS & MAINTENNCE (ICOMP) STANDARD PRACTICE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASTM PV INSTALLATON COMMISSIONING, OPERATIONS & MAINTENNCE (ICOMP) STANDARD PRACTICE MEETING ANNOUNCEMENT ASTM International subcommittee E44.09 Photovoltaic Electric Power Conversion will be holding a meeting for their WK43549 Practice for Installation Commissioning Operation and Maintenance Process task group on Thursday, May 8, 2014 at 8:00am until 1:00pm. This meeting will follow the Sandia/EPRI 2014 PV Systems Symposium. The scope of WK43549 is to work with others around the world to

  17. Guidelines and Checklist for Commissioning and Government Acceptance of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC ENABLE Projects | Department of Energy Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Document provides guidance and a checklist to help agencies through the final steps of the ESPC ENABLE project, including project acceptance. By accepting the work of the energy service company (ESCO), the agency is confirming that the energy conservation measures

  18. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FINAL ENVIRONMENTAL ASSESSMENT (August 9, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year license for the proposed Admiralty Inlet Pilot Tidal Project No. 12690, which would be located in Admiralty

  19. Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management

    Office of Environmental Management (EM)

    NRC's Integrated Strategy for NRC s Integrated Strategy for Spent Fuel Management Earl Easton 1 U.S. Nuclear Regulatory Commission May 25, 2010 Road to Yucca Mountain * 20+ years of preparation for the licensing i review * DOE application received in June 2008 and accepted for review in September 2008 * President Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 2 * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future 2

  20. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corpus Christi Liquefaction, LLC Docket Nos. CP12-507-000 Cheniere Corpus Christi Pipeline, LP CP12-508-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CORPUS CHRISTI LNG PROJECT (June 13, 2014) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Corpus Christi LNG Project (Project), proposed by Corpus Christi Liquefaction, LLC and Cheniere Corpus Christ Pipeline, LP

  1. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporation Docket No. PF14-21-000 BP Alaska LNG, LLC Conoco Phillips Alaska LNG Company ExxonMobil Alaska LNG, LLC TransCanada Alaska Midstream, LP NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED ALASKA LNG PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 4, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Alaska LNG

  2. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Port Arthur LNG, LLC and Docket Nos. PF15-18-000 and Port Arthur Pipeline, LLC PF15-19-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PORT ARTHUR LIQUEFACTION PROJECT AND PORT ARTHUR PIPELINE PROJECT, REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES, AND NOTICE OF PUBLIC SCOPING MEETINGS (June 24, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental

  3. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct additional public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC;

  4. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 8, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC; and TransCanada Alaska

  5. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jordan Cove Energy Project LP Docket No. CP13-483-000 Pacific Connector Gas Pipeline LP Docket No. CP13-492-000 NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED JORDAN COVE LIQUEFACTION AND PACIFIC CONNECTOR PIPELINE PROJECTS (September 30, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) for the Jordan Cove Liquefaction Project proposed by Jordan Cove Energy Project LP

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet

  7. Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Office of Environmental Management (EM)

    4 Financial Statement Audit OAS-FS-15-05 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 17, 2014 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit"

  8. Commission to Review the Effectiveness of the National Energy Laboratories

    Office of Environmental Management (EM)

    | Department of Energy Commission to Review the Effectiveness of the National Energy Laboratories + - Department of Energy National Laboratories Click on a National Laboratory to learn more. Hide Research Learn more about the Department of Energy's National Labs Visit this lab's site Click on a National Laboratory Employees Learn more about the Department of Energy's National Labs Visit this lab's site About the Commission Section 319 of the Consolidated Appropriations Act, 2014, Public Law

  9. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    SciTech Connect (OSTI)

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

  10. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Broader source: Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  11. Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57

    Broader source: Energy.gov [DOE]

    The California Energy Commission (Energy Commission) expressed concern about the differences in the stringency of California standards and the proposed DOE standards.  The Energy Commission...

  12. Commissioning of the Ground Test Accelerator Intertank Matching Section

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented.

  13. Commissioning of the Ground Test Accelerator Intertank Matching Section

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented.

  14. New Siemens Research Turbine Commissioned at NREL - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Siemens Research Turbine Commissioned at NREL Government-industry R&D partnership is largest ever October 19, 2009 The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) and Siemens Energy Inc. today formally commissioned a new 2.3 megawatt Siemens wind turbine at NREL's National Wind Technology Center. The turbine is the centerpiece of a multi-year project to study the performance and aerodynamics of a new class of large, land-based machines - in what will be

  15. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Energy Savers [EERE]

    of a Second Early Site Permit in Just One Month | Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the

  16. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect (OSTI)

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  17. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 22, 2015 | Department of Energy May 22, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, May 22, 2015 May 22, 2015 - 3:35pm Addthis Agenda SLAC National Accelerator Laboratory Kavli Auditorium, Bldg. 51 (Kavli Building) 2575 Sand Hill Road May 22, 2015 (Download Meeting Minutes) 9:00 - 9:05 AM Introduction Commission Co-chairs, T.J. Glauthier and Jared Cohon 9:05 - 10:00 AM Laboratory Directors (Download Presentations) Chi-Chang Kao, SLAC National

  18. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect (OSTI)

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  19. UNITED STATES ATOMIC ENERGY COMMISSION Washington 25, D. C.

    Office of Legacy Management (LM)

    Iv\13 .,34 -03 UNITED STATES ATOMIC ENERGY COMMISSION Washington 25, D. C. No. D-181 Tel. HAzelwood 7-7831 Ext. 3446 FOR IMMEDIATE RELEASE. (Monday, July 24, 1961) AEC AUTHGRIZES START-UP, AND TESTING OF N.S. SAVANNAH'S REACTOR The Atomic Energy Commission t,oday authorized, subject to certain conditions, fueling, start-up and opera- tion of the reactor of'the N. S. Savannah, the world's first nuclear cargo-passenger ship, for test and demonstration purposes at Camden, New Jersey, and Yorktown,

  20. Energy Audit and Retro-Commissioning Policies for Public and Commercial

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings | Department of Energy Retro-Commissioning Policies for Public and Commercial Buildings More Documents & Publications ENERGY STAR Guide to Retro-Commissioning Including Retro-Commissioning in Federal Energy Savings Performance Contracts Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  1. Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

    Broader source: Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule

  2. US Nuclear Regulatory Commission functional organization charts, March 15, 1993. Revision 16

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  3. NSLS-II injector commissioning and initial operation

    SciTech Connect (OSTI)

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  4. First beam commissioning at BNL ERL SRF Gun

    SciTech Connect (OSTI)

    Xu, W.; Altinbas, Z.; Belomestnykh, S.; Ben-Zvi, I.; Deonarine, S.; DeSanto, L.; Gassner, D.; Gupta, R. C.; Hahn, H.; Hammons, L.; Ho, C.; Jamilkoski, J.; Kankiya, P.; Kayran, D.; Kellerman, R.; Laloudakis, N.; Lambiase, R.; Liaw, C.; Litvinenko, V.; Mahler, G.; Masi, L.; McIntyre, G.; Miller, T.; Philips, D.; Ptitsyn, V.; Seda, T.; Sheehy, B.; Smith, K.; Rao, T.; Steszyn, A.; Tallerico, T.; Than, R.; Tuozollo, J.; Wang, E.; Weiss, D.; Wiliniski, M.; Zaltsman, A.

    2015-05-03

    The 704 MHz SRF gun successfully generated the first photoemission beam in November of 2014. The configurations of the test and the sub-systems are described.The latest results of SRF commissioning, including the cavity performance, cathode QE measurements, beam current/energy measurements, are presented in the paper.

  5. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  6. Methods for Automated and Continuous Commissioning of Building Systems

    SciTech Connect (OSTI)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  7. Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

    2008-03-31

    This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

  8. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    NONE

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  9. Commissioning of the EBIS-based heavy ion preinjector at Brookhaven

    SciTech Connect (OSTI)

    Alessi, J.; Beebe, E.; Binello, S.; Hoff, L.; Kondo, K.; Lambiase, R.; LoDestro, V.; Mapes, M.; McNerney, A.; Morris, J.; Okamura, M.; Pikin, A.I.; Raparia, D.; Ritter, J.; Smart, L.; Snydstrup, L.; Wilinski, M.; Zaltsman, A.; Schempp, A.; Ratzinger, U.; Kanesue, T.

    2010-09-12

    The status is presented of the commissioning of a new heavy ion preinjector at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an RFQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider (RHIC) and the NASA Space Radiation Laboratory (NSRL). Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both science programs. For initial setup, helium beam from EBIS was injected and circulated in the Booster synchrotron. Following this, accelerated Au{sup 32+} and Fe{sup 20+} beams were transported to the Booster injection point, fulfilling DOE requirements for project completion.

  10. DEPARTMENT OF ENERGY CHARTER FOR THE COMMISSION TO REVIEW THE EFFECTIVENESS OF

    Office of Environmental Management (EM)

    CHARTER FOR THE COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABO RA TORIES 1. Committee's Official Designation: Commission to Review the Effectiveness of the National Energy Laboratories (Commission on Labs) 2. Authority: This charter establishes the Commission pursuant to section 319 of the Consolidated Appropriations Act, 2014, Public Law No. 113-76. The Commission is being established in accordance with the provisions of the Federal Advisory Committee Act (FACA), as amended,

  11. Breach, Leach and Transport-Multiple Species WIN

    Energy Science and Technology Software Center (OSTI)

    2005-12-01

    BLTMSIN-WIN is a Windows-based preprocessor for the Breach, Leach, and Transport - Multiple Species (BLT-MS) code developed by the Nuclear Regulatory Commission (NRC) for performance assessment analyses of low-level radioactive waste disposal facilities. It is based, in part, on the preprocessor that the NRC developed, BLTMSIN. The code is written in Fortran and compiled with the Lahey Fortran compiler.

  12. MULTIPLE LETTERS Mr. James Speir, Vice President Phosphate Operations

    Office of Legacy Management (LM)

    52. APR 9 1986 MULTIPLE LETTERS Mr. James Speir, Vice President Phosphate Operations International Minerals and Chemical Corporation P.O. Box 7047 Lakeland, Florida 33807 Dear Mr. Speir: The Department of Energy is evaluating the radiological condition of sites that were utilized by the Manhattan Engineer District and the Atomic Energy Commission (AEC) during the early years of nuclear energy development to determine whether they need remedial action and whether the Department has authority to

  13. Commissioning tools for life-cycle building performance assurance

    SciTech Connect (OSTI)

    Piette, M.A.

    1996-05-01

    This paper discusses information systems for building life-cycle performance analysis and the use of computer-based commissioning tools within this context. There are many reasons why buildings do not perform in practice as well as intended at the design stage. One reason is the lack of commissioning. A second reason is that design intent is not well documented, and performance targets for building components and systems are not well specified. Thus, criteria for defining verification and functional tests is unclear. A third reason is that critical information is often lost throughout the building life-cycle, which causes problems such as misunderstanding of operational characteristics and sequences and reduced overall performance. The life-cycle building performance analysis tools project discussed in this paper are focused on chillers and cooling systems.

  14. CEBAF SRF Performance during Initial 12 GeV Commissioning

    SciTech Connect (OSTI)

    Bachimanchi, Ramakrishna; Allison, Trent; Daly, Edward; Drury, Michael; Hovater, J; Lahti, George; Mounts, Clyde; Nelson, Richard; Plawski, Tomasz

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a QL of 3×107. Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

  15. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect (OSTI)

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  16. COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

    SciTech Connect (OSTI)

    Allison, Trent; Davis, G; Drury, Michael; Harwood, Leigh; Hogan, John; Kimber, Andrew; Lahti, George; Merz, William; Nelson, Richard; Plawski, Tomasz; Seidman, David; Spata, Michael; Wilson, Michael

    2012-07-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

  17. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect (OSTI)

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  18. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect (OSTI)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  19. Commissioning of the Fresno, California, Retrofit Unoccupied Test House

    SciTech Connect (OSTI)

    Stecher, D.; Imm, C.

    2013-06-01

    Commissioning of instrumentation and limited short-term testing have been completed on a retrofit unoccupied test house in Fresno, California. This house is intended to be used as a laboratory in which several different methods of space conditioning distribution will be evaluated. This report provides background on the project, including specifications of the house and models used in its development, along with models to be evaluated through its operation.

  20. DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed

    Broader source: Energy.gov (indexed) [DOE]

    Facilities | Department of Energy Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today announced the award of a contract to Spectra Tech, Inc. for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations. The scope includes the management and operation of the Fort Saint Vrain

  1. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations

    Office of Environmental Management (EM)

    Blue Ribbon Commission Report and Transportation Program Corinne Macaluso National Transportation Stakeholders Forum Knoxville, Tennessee May 16, 2012 2  Formed at the direction of the President to Secretary Chu and included leading experts.  Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal.  Detailed analysis, with eight major recommendations; also recommended near-term actions.

  2. Analysis on linac quadrupole misalignment in FACET commissioning 2012

    SciTech Connect (OSTI)

    Sun, Yipeng; /SLAC

    2012-07-05

    In this note, the analysis on linac quadrupole misalignment is presented for the FACET linac section LI05-09 plus LI11-19. The effectiveness of the beam-based alignment technique is preliminarily confirmed by the measurement. Beam-based alignment technique was adopted at SLAC linac since SLC time. Here the beam-based alignment algorithms are further developed and applied in the FACET commissioning during 2012 run.

  3. Louisiana Blue Ribbon Commission on Bayou Corne Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blue Ribbon Commission on Bayou Corne Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  4. Commissioning and Operation of 12 GeV CEBAF

    SciTech Connect (OSTI)

    Freyberger, Arne P.

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) located at the Thomas Jefferson National Accelerator Laboratory (JLab) has been recently upgraded to deliver continuous electron beams to the experimental users at a maximum energy of 12 GeV, three times the original design energy of 4 GeV. This paper will present an overview of the upgrade, referred to as the 12GeV upgrade, and highlights from recent beam commissioning results.

  5. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    &al IL.6 . . UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE 9800 SOUTH CASS AVENUE ARGONNE, ILLINOIS 60439 ztc.&-jj TELEPHONE (312) 739-7711 NOV I 2 1974 Martin B. Biles, Director Division of Operational Safety, HQ RADIOLOGICAL CONDITION SURVEYS OF REAL PROPERTY Reference: Memorandum, Bauer to Biles, dated g/3/74 Enclosed for your information and use is a copy of the September 25, 1974, letter, Neal (ANL) to Manager (CH), with attachments which contain material

  6. UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE

    Office of Legacy Management (LM)

    UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE . MASTER .r NVO-152 DECEMBER 1974 Las Vegas, Nevada i, SUMMARY RIEPORT , . I ' i (ENT~ALNEVAD~TESTAREA D'lEMOBILIZATION AND '. !: RESTORATION ACTIVITIES --- -- --.- _.-~., ......~~-- . 1;/ , ",' NVO-152' ~ ~ .. I * , * " I ~I 'I 'I I~ I: I I I' I I. :."S;_~:.., 1'0" ,. <:. .* I DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United

  7. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    $$ ,_, . UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE TELEPHONE 9600 SOUTH CASS AVENUE (312) 739-7711 ARCONNE. ILLINOIS 60439 ^,/" _. i ' > ;.:a c. JAN 17 1975 Martin B. Biles, Director Division of Operational Safety, HQ _ DISPOSAL OF SCRAP COPPER, CYCLOTRON DISMANTLING PROJECT, NUCLEAR RESEARCH CENTER, CARNEGIE-MELLON UNIVERSITY (CMU) Enclosed for your information is a copy of the October 28, 1974, letter from T. Morris (CMD) to J. Krupa (CH) with pages 1-4 and 8-16

  8. ABBREVIATIONS AND ACRONYMS AEC U.S. Atomic Energy Commission

    Office of Legacy Management (LM)

    ABBREVIATIONS AND ACRONYMS AEC U.S. Atomic Energy Commission CEDE committed effective dose equivalent CERCLA Comprehensive Environmental Response, Compensation, and Liability Act cpm counts per minute DCGL w Derived Concentration Guideline Limit DOE U.S. Department of Energy dpm disintegrations per minute DQO Data Quality Objectives EPA Environmental Protection Agency FUSRAP Formerly Utilized Sites Remedial Action Program H 0 Null Hypothesis IAEA International Atomic Energy Agency IDNS Illinois

  9. Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission

    Office of Legacy Management (LM)

    111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W Enclosed are the copfes of the final ORNL survey reports on the radiologlcal Surveys conducted on three Teterboro, New Jersey properties; Metpath Incorporated, Allied Aerospace Corporatio; and Sumftomo Machinery Corporation. Copies of these reports have &en sent directly to the owners by our survey contractor Oak

  10. Denali Commission: Department of Energy Tribal Energy Conference

    Office of Environmental Management (EM)

    Department of Energy - Tribal Energy Conference Denali Daniels October 2010 Alaska Road System Alaska Fun Facts  13% of !laska's population is !laska Native - greatest proportion in the U.S.  Over 200 of 562 federally recognized tribal governments are in Alaska  Only one reservation exists in Alaska - Metlakatla  Alaska Native Claims Settlement Act (ANCSA) model developed 13 regional corporations as an alternative Koyukuk Old Tanks Denali Commission Energy Program Three Program

  11. Commissioning results from the recently upgraded RHIC LLRF system

    SciTech Connect (OSTI)

    Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

    2011-03-28

    During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

  12. Handling radiation generated during an ion source commissioning

    SciTech Connect (OSTI)

    Ren, H. T.; Zhao, J. Peng, S. X.; Lu, P. N.; Zhou, Q. F.; Xu, Y.; Chen, J.; Zhang, T.; Zhang, A. L.; Guo, Z. Y.; Chen, J. E.

    2014-02-15

    Radiation is an important issue, which should be carefully treated during the design and commissioning of an ion source. Measurements show that X-rays are generated around the ceramics column of an extraction system when the source is powered up to 30 kV. The X-ray dose increases greatly when a beam is extracted. Inserting the ceramic column into a metal vacuum box is a good way to block X-ray emission for those cases. Moreover, this makes the online test of an intense H{sup +} ion beam with energy up to 100 keV possible. However, for deuteron ion source commissioning, neutron and gamma-ray radiation become a serious topic. In this paper, we will describe the design of the extraction system and the radiation doses of neutrons and gamma-rays measured at different D{sup +} beam energy during our 2.45 GHz deuteron electron cyclotron resonance ion source commissioning for PKUNIFTY (PeKing University Neutron Imaging FaciliTY) project at Peking University.

  13. Multiple density layered insulator

    DOE Patents [OSTI]

    Alger, T.W.

    1994-09-06

    A multiple density layered insulator for use with a laser is disclosed which provides at least two different insulation materials for a laser discharge tube, where the two insulation materials have different thermoconductivities. The multiple layer insulation materials provide for improved thermoconductivity capability for improved laser operation. 4 figs.

  14. Multiple density layered insulator

    DOE Patents [OSTI]

    Alger, Terry W. (Tracy, CA)

    1994-01-01

    A multiple density layered insulator for use with a laser is disclosed wh provides at least two different insulation materials for a laser discharge tube, where the two insulation materials have different thermoconductivities. The multiple layer insulation materials provide for improved thermoconductivity capability for improved laser operation.

  15. Bayesian Inference for Time Trends in Parameter Values: Case Study for the Ageing PSA Network of the European Commission

    SciTech Connect (OSTI)

    Dana L. Kelly; Albert Malkhasyan

    2010-06-01

    There is a nearly ubiquitous assumption in PSA that parameter values are at least piecewise-constant in time. As a result, Bayesian inference tends to incorporate many years of plant operation, over which there have been significant changes in plant operational and maintenance practices, plant management, etc. These changes can cause significant changes in parameter values over time; however, failure to perform Bayesian inference in the proper time-dependent framework can mask these changes. Failure to question the assumption of constant parameter values, and failure to perform Bayesian inference in the proper time-dependent framework were noted as important issues in NUREG/CR-6813, performed for the U. S. Nuclear Regulatory Commissions Advisory Committee on Reactor Safeguards in 2003. That report noted that industry lacks tools to perform time-trend analysis with Bayesian updating. This paper describes an application of time-dependent Bayesian inference methods developed for the European Commission Ageing PSA Network. These methods utilize open-source software, implementing Markov chain Monte Carlo sampling. The paper also illustrates the development of a generic prior distribution, which incorporates multiple sources of generic data via weighting factors that address differences in key influences, such as vendor, component boundaries, conditions of the operating environment, etc.

  16. Project Reports for Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  17. File:07-FD-a - PlantCommissioning.pdf | Open Energy Information

    Open Energy Info (EERE)

    7-FD-a - PlantCommissioning.pdf Jump to: navigation, search File File history File usage Metadata File:07-FD-a - PlantCommissioning.pdf Size of this preview: 463 599 pixels....

  18. Recovery Act-Funded 90-m Blade Test Facility Commissioned May...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act-Funded 90-m Blade Test Facility Commissioned May 18, 2011 Recovery Act-Funded 90-m Blade Test Facility Commissioned May 18, 2011 May 20, 2011 - 3:06pm Addthis This is ...

  19. File:07ORBStatePlantCommissioningProcess (1).pdf | Open Energy...

    Open Energy Info (EERE)

    7ORBStatePlantCommissioningProcess (1).pdf Jump to: navigation, search File File history File usage Metadata File:07ORBStatePlantCommissioningProcess (1).pdf Size of this preview:...

  20. Alaska - AS 42.05.431 - Power of Commission to Fix Rates | Open...

    Open Energy Info (EERE)

    - AS 42.05.431 - Power of Commission to Fix RatesLegal Abstract This section sets forth the authority of the Regulatory Commission to fix rates for service by utilities....

  1. File:07UTCUtahPublicServiceCommissionProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    UTCUtahPublicServiceCommissionProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07UTCUtahPublicServiceCommissionProcess.pdf Size of this preview:...

  2. File:07CABPlantCommissioningProcessSmallPowerPlantExemption.pdf...

    Open Energy Info (EERE)

    7CABPlantCommissioningProcessSmallPowerPlantExemption.pdf Jump to: navigation, search File File history File usage Metadata File:07CABPlantCommissioningProcessSmallPowerPlantExempt...

  3. Commission to Review the Effectiveness of the National Energy Laboratories Inaugural Meeting

    Broader source: Energy.gov [DOE]

    10:30 10:45 AM Welcome and Introduction of the CommissionSecretary Ernest J. MonizCommission Co-chairs, T.J. Glauthier and Jared Cohon

  4. SU-E-T-73: Commissioning of a Treatment Planning System for Proton Spot Scanning

    SciTech Connect (OSTI)

    Saini, J; Kang, Y; Schultz, L; Nicewonger, D; Herrera, M; Wong, T; Bowen, S; Bloch, C

    2014-06-01

    Purpose: A treatment planning system (TPS) was commissioned for clinical use with a fixed beam line proton delivery system. An outline of the data collection, modeling, and verification is provided. Methods: Beam data modeling for proton spot scanning in CMS Xio TPS requires the following measurements: (i) integral depth dose curves (IDDCs); (ii) absolute dose calibration; and (iii) beam spot characteristics. The IDDCs for 18 proton energies were measured using an integrating detector in a single spot field in a water phantom. Absolute scaling of the IDDCs were performed based on ion chamber measurements in mono-energetic 1010 cm{sup 2} fields in water. Beam spot shapes were measured in air using a flat panel scintillator detector at multiple planes. For beam model verification, more than 45 uniform dose phantom and patient plans were generated. These plans were used to measure range, point dose, and longitudinal and lateral profiles. Tolerances employed for verification are: point dose and longitudinal profiles, 2%; range, 1 mm; FWHM for lateral profiles, 2 mm; and patient plan dose distribution, gamma index of >90% at 3%/3 mm criteria. Results: More than 97% of the point dose measurements out of 115 were within +/-2% with maximum deviation of 3%. 98% of the ranges measured were within 1 mm with maximum deviation of 1.4mm. The normalized depth doses were within 2% at all depths. The maximum error in FWHM of lateral profiles was found to be less than 2mm. For 5 patient plans representing different anatomic sites, a total of 38 planes for 12 beams were analyzed for gamma index with average value of 99% and minimum of 94%. Conclusions: The planning system is successfully commissioned and can be safely deployed for clinical use. Measurements of IDDCs on user beam are highly recommended instead of using standard beam IDDCs.

  5. Commission to Review the Effectiveness of the National Energy Laboratories- October 6, 2014

    Broader source: Energy.gov [DOE]

    This was the third meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  6. Commission to Review the Effectiveness of the National Energy Laboratories, November 4, 2014

    Broader source: Energy.gov [DOE]

    This is the fourth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  7. Commission to Review the Effectiveness of the National Energy Laboratories- September 15, 2014

    Broader source: Energy.gov [DOE]

    This was the second meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL).

  8. Commission to Review the Effectiveness of the National Energy Laboratories, February 24, 2015

    Broader source: Energy.gov [DOE]

    This is the sixth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  9. Commission to Review the Effectiveness of the National Energy Laboratories, April 22, 2015

    Broader source: Energy.gov [DOE]

    This is the eighth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  10. FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LABORATORIES | Department of Energy FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES The Commission convened its final meeting in a public teleconference on October 23, 2015. At this meeting, the Commission outlined comments received on its final report during the written public comment period, heard additional comments from the public, and voted unanimously to

  11. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01

    Energy Savers [EERE]

    2 OAS-L-13-01 November 2012 Department of Energy Washington, DC 20585 November 7, 2012 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent

  12. US Nuclear Regulatory Commission functional organization charts, January 31, 1992. Revision 15

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  13. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 19

    SciTech Connect (OSTI)

    NONE

    1996-01-31

    Functional statements and organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  14. Charter for the Commission to Review the Effectiveness of the National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Laboratories | Department of Energy Charter for the Commission to Review the Effectiveness of the National Energy Laboratories Charter for the Commission to Review the Effectiveness of the National Energy Laboratories Two phases are planned for the Commission. In Phase 1, the objective of the Commission is to address whether the Department of Energy's (DOE) national laboratories are properly aligned with the Department's strategic priorities; have clear, well understood, and properly

  15. Commission to Review the Effectiveness of the National Energy Laboratories, December 15, 2014

    Broader source: Energy.gov [DOE]

    This is the fifth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  16. Interim Report of the Commission to Review the Effectiveness of the

    Office of Environmental Management (EM)

    National Energy Laboratories | Department of Energy Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories This Interim Report presents the preliminary observations and recommendations gleaned from Phase I of the study by the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). Key issues of the report focus on the

  17. Commissioning and performance of the BNL EBIS LLRF system

    SciTech Connect (OSTI)

    Yuan, S.; Smith, K.S.; Hayes, T.; Severino, F.; Harvey, M.; Narayan, G.; Zaltsman, A.

    2011-03-28

    The Electron Beam Ion Source (EBIS) LLRF system utilizes the RHIC LLRF upgrade platform to achieve the required functionality and flexibility. The LLRF system provides drive to the EBIS high-level RF system, employs I-Q feedback to provide required amplitude and phase stability, and implements a cavity resonance control scheme. The embedded system provides the interface to the existing Controls System, making remote system control and diagnostics possible. The flexibility of the system allows us to reuse VHDL codes, develop new functionalities, improve current designs, and implement new features with relative ease. In this paper, we will discuss the commissioning process, issues encountered, and performance of the system.

  18. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  19. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  20. CMS Jet and Missing $E_T$ Commissioning

    SciTech Connect (OSTI)

    Elvira, V.Daniel; /Fermilab

    2009-01-01

    We describe how jets and E{sub T} are defined, reconstructed, and calibrated in CMS, as well as how the CMS detector performs in measuring these physics objects. Performance results are derived from the CMS simulation application, based on Geant4, and also from noise and cosmic commissioning data taken before the first collision event was recorded by CMS in November 2009. A jet and E{sub T} startup plan is in place which includes a data quality monitoring and prompt analysis task force to identify and fix problems as they arise.

  1. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gulf LNG Liquefaction Company, LLC Docket No. PF13-4-000 Gulf LNG Energy, LLC Gulf LNG Pipelines, LLC NOTICE OF EXTENSION OF TIME (August 27, 2014) On July 31, 2014, the Commission issued a "Notice of Intent to Prepare an Environmental Impact Statement for the Planned Gulf LNG Liquefaction Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting" (NOI). The NOI identified September 1, 2014 as the close of the scoping period. It has come to our

  2. UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office

    Office of Legacy Management (LM)

    fi ' J/ui : ,I/ /J ii%/~it~ - ,,(,C, \,\J,iT/~l \ 11, ?' UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office Files (.Thrur V.L.Parsegian, Director, Division of Technical Advisers) Decenber 19, 1950 9; G.Strc&e, Division of Technical Advisers COLD-DRAWING OF TJRAXItZI RODS A BXIDGEPORT BRATS CO'Ei+A!R Symbol: TAtFGSrmam On 12/11/50, an exper%mnt was conducted at the Bridgmort Brass Company in whioh an attanpt m m made to cold-draw hot-foiled rods of uranium tich had been pickled

  3. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS

    Office of Legacy Management (LM)

    AL, 3 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS CINCINNATI AREA P. 0. BOX 39198, CINCINNATI 39, OHIO IN REPLY REFER TO: 0:OJT --r.LAal Cl E:c Mr. J. H. Noyes, Plant Manager National Lead Company of Ohio P. 0. Box 39158 Cincinnati 39, Ohio Subject: HOT TENSILE TESTS OF URANIUM - SOUTHERN RESEARCH INSTITUTE Dear Mr. Noyee: I / Reference is made to your letter of May 17, 1962, on the above subject. Approval is granted for the off-site movement of up to 300 pounds of normal uranium

  4. ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE

    Office of Legacy Management (LM)

    COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE Pursuant to the rcgu!ations in Title 10, Code of Federal Regulations, Chapter 1, Part 40, application is hereby made for a license to receive, possess, use, transfer, deliver or import into the United Stat-, source material for the activity or activities described. 1. (check ooa) 2. NAME OF APPLICANT W. R. GRACE 6 Co. 0 (a) New Iicense 0 (b) Amendment to License No.- Davison Chemical Division STA-422 3. Q (c) Renewal of Licensr No. 0 (d)

  5. Photovoltaics: Separating Multiple Excitons

    SciTech Connect (OSTI)

    Nozik, A. J.

    2012-05-01

    Scientists have demonstrated an efficient process for generating multiple excitons in adjacent silicon nanocrystals from a single high-energy photon. Their findings could prove useful for a wide range of photovoltaic applications.

  6. Multiple stage multiple filter hydrate store

    DOE Patents [OSTI]

    Bjorkman, H.K. Jr.

    1983-05-31

    An improved hydrate store for a metal halogen battery system is disclosed which employs a multiple stage, multiple filter means for separating the halogen hydrate from the liquid used in forming the hydrate. The filter means is constructed in the form of three separate sections which combine to substantially cover the interior surface of the store container. Exit conduit means is provided in association with the filter means for transmitting liquid passing through the filter means to a hydrate former subsystem. The hydrate former subsystem combines the halogen gas generated during the charging of the battery system with the liquid to form the hydrate in association with the store. Relief valve means is interposed in the exit conduit means for controlling the operation of the separate sections of the filter means, such that the liquid flow through the exit conduit means from each of the separate sections is controlled in a predetermined sequence. The three separate sections of the filter means operate in three discrete stages to provide a substantially uniform liquid flow to the hydrate former subsystem during the charging of the battery system. The separation of the liquid from the hydrate causes an increase in the density of the hydrate by concentrating the hydrate along the filter means. 7 figs.

  7. Multiple stage multiple filter hydrate store

    DOE Patents [OSTI]

    Bjorkman, Jr., Harry K.

    1983-05-31

    An improved hydrate store for a metal halogen battery system is disclosed which employs a multiple stage, multiple filter means or separating the halogen hydrate from the liquid used in forming the hydrate. The filter means is constructed in the form of three separate sections which combine to substantially cover the interior surface of the store container. Exit conduit means is provided in association with the filter means for transmitting liquid passing through the filter means to a hydrate former subsystem. The hydrate former subsystem combines the halogen gas generated during the charging of the battery system with the liquid to form the hydrate in association with the store. Relief valve means is interposed in the exit conduit means for controlling the operation of the separate sections of the filter means, such that the liquid flow through the exit conduit means from each of the separate sections is controlled in a predetermined sequence. The three separate sections of the filter means operate in three discrete stages to provide a substantially uniform liquid flow to the hydrate former subsystem during the charging of the battery system. The separation of the liquid from the hydrate causes an increase in the density of the hydrate by concentrating the hydrate along the filter means.

  8. Automated Proactive Fault Isolation: A Key to Automated Commissioning

    SciTech Connect (OSTI)

    Katipamula, Srinivas; Brambley, Michael R.

    2007-07-31

    In this paper, we present a generic model for automated continuous commissioing and then delve in detail into one of the processes, proactive testing for fault isolation, which is key to automating commissioning. The automated commissioining process uses passive observation-based fault detction and diagnostic techniques, followed by automated proactive testing for fault isolation, automated fault evaluation, and automated reconfiguration of controls together to continuously keep equipment controlled and running as intended. Only when hard failures occur or a physical replacement is required does the process require human intervention, and then sufficient information is provided by the automated commissioning system to target manual maintenance where it is needed. We then focus on fault isolation by presenting detailed logic that can be used to automatically isolate faults in valves, a common component in HVAC systems, as an example of how automated proactive fault isolation can be accomplished. We conclude the paper with a discussion of how this approach to isolating faults can be applied to other common HVAC components and their automated commmissioning and a summary of key conclusions of the paper.

  9. The intermountain power project commissioning - Subsynchronous torsional interaction tests

    SciTech Connect (OSTI)

    Wu, C.T.; Peterson, K.J. ); Pinko, R.J.; Kankam, M.D.; Baker, D.H. )

    1988-10-01

    Subsyncronous torsional vibration as a result of electrochemical interaction between the HVDC controls and a turbine-generator was first discovered during the commissioning of the Square Butte Project in 1977. The level of interaction between the HVDC controls and the turbine-generator depends on several interacting factors: the characteristic torsional frequencies of the turbine-generator, the bandwidth of the HVDC controls and the relative strength of the connecting ac system. For the Intermountain Power Project (IPP), early analysis of these interacting factors indicated that there exist definite potential for subsynchronous oscillation to occur. The calculated torsional frequencies of the IPP units showed that the first mode frequency is 14.0 Hz and is within the typical bandwidth of an HVDC control which is between 10-20 Hz. The HVDC controls, therefore, can influence the torsional stability of the IPP units. Further, the IPP turbine-generators are required to operate isolated on the HVDC rectifier terminal, with no other interconnecting ac network. This ''radial'' mode of operation will result in maximum interaction between the converter station and the IPP units. It became obvious that special measure must be implemented in the design of the IPP HVDC control system to modify its typical characteristics to avoid the occurrence of the subsynchronous oscillation. This paper presents the results of the subsynchronous torsional interaction (SSTI) tests that were performed during the commissioning of the IPP Unit 1 and the HVDC Transmission system.

  10. Comparison with Carrier Multiplication

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Theory of Down-Conversion, and a Comparison with Carrier Multiplication 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 22 24 26 28 30 32 34 Measured Quantum Efficiency (QE) Efficiency [%] with Down-Conversion Single- Junction Threshold Solar Cell 1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 80 90 Peak Efficiency [%] Splitting Multiplicity (M) C=max C=1000 C=100 C=1 C=10 Down Conversion Carrier Multiplication Ze'ev R. Abrams, Avi Niv, Majid Gharghi, Chris Gladden & Xiang Zhang Materials Science

  11. Multiple sort flow cytometer

    DOE Patents [OSTI]

    Engh, G. van den; Esposito, R.J.

    1996-01-09

    A flow cytometer utilizes multiple lasers for excitation and respective fluorescence of identified dyes bonded to specific cells or events to identify and verify multiple events to be sorted from a sheath flow and droplet stream. Once identified, verified and timed in the sheath flow, each event is independently tagged upon separation from the flow by an electrical charge of +60, +120, or +180 volts and passed through oppositely charged deflection plates with ground planes to yield a focused six way deflection of at least six events in a narrow plane. 8 figs.

  12. Multiple sort flow cytometer

    DOE Patents [OSTI]

    Van den Engh, Ger (Seattle, WA); Esposito, Richard J. (Seattle, WA)

    1996-01-01

    A flow cytometer utilizes multiple lasers for excitation and respective fluorescence of identified dyes bonded to specific cells or events to identify and verify multiple events to be sorted from a sheath flow and droplet stream. Once identified, verified and timed in the sheath flow, each event is independently tagged upon separation from the flow by an electrical charge of +60, +120, or +180 volts and passed through oppositely charged deflection plates with ground planes to yield a focused six way deflection of at least six events in a narrow plane.

  13. Gore-Mbeki Binational Commission integrated housing program. Final report

    SciTech Connect (OSTI)

    1998-12-31

    This report documents the work done under Grant DE-FG36-97GO10209, Innovative Renewable Energy Technology Transfer Program. PEER Consultants, PC, and its subcontractor, PEER Africa (Pty.) Ltd., received an $88,000.00 grant to plan and build two energy efficient homes in the black township of Gugulethu in Cape Town, South Africa. These demonstration homes were given to the people of South Africa as a gesture of goodwill by the US government as part of the Gore-Mbeki Binational Commission (BNC) agreements and cooperation. The BNC is the term used to describe the agreement to work together by the US and the South African governments for economic development of South Africa in the areas of energy, commerce, agriculture, housing, and transportation. The BNC was formed in 1995. This project under the auspices of the BNC started in September 1996. The DOE-funded portion was performed between January 11, 1997 and February 28, 1997.

  14. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20556

    Office of Scientific and Technical Information (OSTI)

    NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20556 P I c; Reactor S a f e t y Study WASH-1400 (NUREG75/014) c - ERRATA SHEET \ 4 " I f p r o b a b i l i t y o f damage t o a s i n g l e s y s t e m i s u s e d , . . ." i Change 1 . 5 t o 1/5 p 1 0 0 , 1 0 1 F o o t n o t e t o F i g s . 5-15 p 1 1 1 Table 6-1 Change 4 x l O - * t o ~ X I O - ~ 1 - p 114 T a b l e 6-7 , Change 5000 t o 15,000 4 Change t o r e a d . + ---A DISCLAIMER This report was prepared as an account of work

  15. Commissioning and operation of the CEBAF end station refrigeration system

    SciTech Connect (OSTI)

    Arenius, D.; Bevins, B.; Chronis, W.C.; Ganni, V.; Kashy, D.; Keesee, M.; Wilson, J. Jr.

    1996-08-01

    The CEBAF End Station Helium Refrigerator (ESR) System provides refrigeration at 80 K, 20 K and 4.5 K to three End Station experimental halls. The facility consists of a two stage helium screw compressor system, 4.5 K refrigerator, cryogen distribution valve box, and transfer lines to the individual experimental halls. The 4.5 K cold box and compressors were originally part of the ESCAR 1,500 W, 4 K refrigeration system at Lawrence Berkeley Laboratory which was first commissioned fin 1977. The compressors, 4.5 K cold box, and control system design were modified to adapt the plant for the requirements of the CEBAF experimental halls. Additional subsystems of cryogen distribution, transfer lines, warm gas management, and computer control interface were added. This paper describes the major plant subsystems, modifications, operational experiences and performance.

  16. RF-Plasma Source Commissioning in Indian Negative Ion Facility

    SciTech Connect (OSTI)

    Singh, M. J.; Bandyopadhyay, M.; Yadava, Ratnakar; Chakraborty, A. K.; Bansal, G.; Gahlaut, A.; Soni, J.; Kumar, Sunil; Pandya, K.; Parmar, K. G.; Sonara, J.; Kraus, W.; Heinemann, B.; Riedl, R.; Obermayer, S.; Martens, C.; Franzen, P.; Fantz, U.

    2011-09-26

    The Indian program of the RF based negative ion source has started off with the commissioning of ROBIN, the inductively coupled RF based negative ion source facility under establishment at Institute for Plasma research (IPR), India. The facility is being developed under a technology transfer agreement with IPP Garching. It consists of a single RF driver based beam source (BATMAN replica) coupled to a 100 kW, 1 MHz RF generator with a self excited oscillator, through a matching network, for plasma production and ion extraction and acceleration. The delivery of the RF generator and the RF plasma source without the accelerator, has enabled initiation of plasma production experiments. The recent experimental campaign has established the matching circuit parameters that result in plasma production with density in the range of 0.5-1x10{sup 18}/m{sup 3}, at operational gas pressures ranging between 0.4-1 Pa. Various configurations of the matching network have been experimented upon to obtain a stable operation of the set up for RF powers ranging between 25-85 kW and pulse lengths ranging between 4-20 s. It has been observed that the range of the parameters of the matching circuit, over which the frequency of the power supply is stable, is narrow and further experiments with increased number of turns in the coil are in the pipeline to see if the range can be widened. In this paper, the description of the experimental system and the commissioning data related to the optimisation of the various parameters of the matching network, to obtain stable plasma of required density, are presented and discussed.

  17. Multiple gap photovoltaic device

    DOE Patents [OSTI]

    Dalal, Vikram L. (Newark, DE)

    1981-01-01

    A multiple gap photovoltaic device having a transparent electrical contact adjacent a first cell which in turn is adjacent a second cell on an opaque electrical contact, includes utilizing an amorphous semiconductor as the first cell and a crystalline semiconductor as the second cell.

  18. Installing and Commissioning a New Radioactive Waste Tracking System - Lessons Learned

    SciTech Connect (OSTI)

    Robert S. Anderson; Miklos Garamszeghy; Fred Rodrigues; Ed Nicholls

    2005-05-01

    Ontario Power Generation (OPG) recognizes the importance of information management particularly with regards to its low and intermediate level waste program. Various computer based waste tracking systems have been used in OPG since the 1980s. These systems tracked the physical receipt, processing, storage, and inventory of the waste. As OPG moved towards long-term management (e.g. disposal), it was recognized that tracking of more detailed waste characterization information was important. This required either substantial modification of the existing system to include a waste characterization module or replacing it entirely with a new system. After a detailed review of available options, it was decided that the existing waste tracking application would be replaced with the Idaho National Laboratorys (INL) Integrated Waste Tracking System (IWTS). Installing and commissioning a system which must receive historical operational waste management information (data) and provide new features, required much more attention than was originally considered. The operational readiness of IWTS required extensive vetting and preparation of historic data (which itself had been created from multiple databases in varied formats) to ensure a consistent format for import of some 30,000-container records, and merging and linking these container records to a waste stream based characterization database. This paper will discuss some of the strengths and weaknesses contributing to project success or hindrance so that others can understand and minimize the difficulties inherent in a project of this magnitude.

  19. Portable multiplicity counter

    DOE Patents [OSTI]

    Newell, Matthew R. (Los Alamos, NM); Jones, David Carl (Los Alamos, NM)

    2009-09-01

    A portable multiplicity counter has signal input circuitry, processing circuitry and a user/computer interface disposed in a housing. The processing circuitry, which can comprise a microcontroller integrated circuit operably coupled to shift register circuitry implemented in a field programmable gate array, is configured to be operable via the user/computer interface to count input signal pluses receivable at said signal input circuitry and record time correlations thereof in a total counting mode, coincidence counting mode and/or a multiplicity counting mode. The user/computer interface can be for example an LCD display/keypad and/or a USB interface. The counter can include a battery pack for powering the counter and low/high voltage power supplies for biasing external detectors so that the counter can be configured as a hand-held device for counting neutron events.

  20. Richard Lazarus Named as Executive Director of National Commission on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BP Deepwater Horizon Oil Spill and Offshore Drilling | Department of Energy Richard Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Richard Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling June 22, 2010 - 12:00am Addthis WASHINGTON, D.C. - The co-chairs of the bipartisan National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling

  1. US Nuclear Regulatory Commission Input to DOE Request for Information Smart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid Implementation Input | Department of Energy US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New

  2. Departmental Response to the Final Report of the Commission to Review the

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Effectiveness of the National Energy Laboratories | Department of Energy Departmental Response to the Final Report of the Commission to Review the Effectiveness of the National Energy Laboratories Departmental Response to the Final Report of the Commission to Review the Effectiveness of the National Energy Laboratories This report provides the Department of Energy's response to the Final Report of the Commission to Review the Effectiveness of the National Energy Laboratories entitled

  3. Before the U.S.-China Economic and Security Review Commission | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Before the U.S.-China Economic and Security Review Commission Before the U.S.-China Economic and Security Review Commission Before the U.S.-China Economic and Security Review Commission By: David Sandalow, Assistant Secretary Office of Policy and International Affairs Subject: China's Green Energy Policies PDF icon 4-8-2010-PI-Final_Testimony_DavidSandalow.pdf More Documents & Publications Statement of David Sandalow Assistant Secretary of Energy for Policy and International

  4. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011, OAS-M-12-01

    Energy Savers [EERE]

    Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011 OAS-M-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011"

  5. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program … 2013

    Energy Savers [EERE]

    Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2013 OAS-M-14-01 October 2013 Department of Energy Washington, DC 20585 October 23, 2013 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program -

  6. Report to Congress:Impacts of the Federal Energy Regulatory Commission's

    Energy Savers [EERE]

    Proposal for Standard Market Design | Department of Energy Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design A report on an independent study to assess various potential impacts of the proposed rulemaking by the Federal Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission

  7. COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR

    Energy Savers [EERE]

    INFORMATION REGARDING SMART GRID POLICY | Department of Energy COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY The Michigan Public Service Commission Staff (MPSC Staff) commends the Department of Energy for seeking comments on policy and challenges confronting smart grid deployments as stated in the Request for

  8. Stanford's input to the Commission to Review the Effectiveness of the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Energy Laboratories | Department of Energy Stanford's input to the Commission to Review the Effectiveness of the National Energy Laboratories Stanford's input to the Commission to Review the Effectiveness of the National Energy Laboratories Stanford's input was presented to the Commission to Review the Effectiveness of the National Energy Laboratories by Bill Madia, Vice President of SLAC National Acceleratory Laboratory and Chair, Board of Overseers, Stanford University. PDF icon

  9. EM Boosts Efforts to Help Japan through Commission Work | Department of

    Office of Environmental Management (EM)

    Energy Boosts Efforts to Help Japan through Commission Work EM Boosts Efforts to Help Japan through Commission Work August 2, 2012 - 12:00pm Addthis TOKYO - EM continues to assist Japan as it recovers from a 2011 nuclear accident through a newly formed bilateral commission established to build on the close, collaborative relationship between the U.S. and Japan. Senior Advisor for Environmental Management David Huizenga and EM Office of Tank Waste Management Director Steve Schneider were

  10. The experimental setup of the Interaction in Crystals for Emission of RADiation collaboration at Mainzer Mikrotron: Design, commissioning, and tests

    SciTech Connect (OSTI)

    Lietti, D.; Backe, H.; Lauth, W.; Bagli, E.; Bandiera, L.; Germogli, G.; Guidi, V.; Mazzolari, A.; Berra, A.; Prest, M.; Carturan, S.; De Salvador, D.; Vallazza, E.

    2015-04-15

    Silicon/germanium flat/bent crystals are thin devices able to efficiently deflect charged particle GeV-energy beams up to a few hundreds of ?rad; moreover, high intensity photons can be efficiently produced in the so-called Multi-Volume Reflection (MVR) and Multiple Volume Reflections in One Crystal (MVROC) conditions. In the last years, the research interest in this field has moved to the dynamic studies of light negative leptons in the low energy range: the possibility to deflect negative particles and to produce high intensity ? sources via the coherent interactions with crystals in the sub-GeV energy range has been proved by the ICE-RAD (Interaction in Crystals for Emission of RADiation) Collaboration at the MAinzer MIkrotron (MAMI, Germany). This paper describes the setup used by the ICE-RAD experiment for the crystals characterization (both in terms of deflection and radiation emission properties): a high precision goniometer is used to align the crystals with the incoming beam, while a silicon based profilometer and an inorganic scintillator reconstruct, respectively, the particle position and the photon spectra after the samples. The crystals manufacturing process and their characterization, the silicon profilometer commissioning at the CERN PS T9 beamline, and the commissioning of the whole setup installed at MAMI are presented.

  11. A history of the United States Atomic Energy Commission, 1952-1960: Volume 3

    SciTech Connect (OSTI)

    Hewlett, R.G.; Holl, J.M.

    1987-01-01

    This is a detailed historical account of the activities and policies of the Atomic Energy Commission during the Eisenhower and Kennedy administrations. 6 figs. (DWL)

  12. The Role of Public Utility Commissions in Energy Efficiency Program Delivery

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assistance Program (TAP), addresses the role of public utility commissions in energy efficiency program delivery. Presented on August 31, 2011.

  13. Report to Congress:Impacts of the Federal Energy Regulatory Commission...

    Office of Environmental Management (EM)

    rulemaking by the Federal Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design."...

  14. FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015. Congress directed the Commission to evaluate the laboratories in terms of their alignment with the Department's strategic priorities, duplication, ability to meet current...

  15. Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process

    Broader source: Energy.gov [DOE]

    Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission

  16. UN Economic and Social Commission for Asia and the Pacific (ESCAP...

    Open Energy Info (EERE)

    of the United Nations five regional commissions, and the largest United Nations body serving the Asia-Pacific region with over 600 staff. ... ESCAP works to overcome some...

  17. Commission to Review the Effectiveness of the National Energy Laboratories Inaugural Meeting

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories held its first meeting in Washington, DC on July 18, 2014.

  18. Atoms for peace and war, 1953-1961: Eisenhower and the Atomic Energy Commission

    SciTech Connect (OSTI)

    Hewlett, Richard G.; Holl, Jack M.

    1989-12-01

    This third volume in the official history of the U.S. Atomic Energy Commission covers the years of the Eisenhower Administration.

  19. Factsheet: Second Meeting of the United States-Japan Bilateral Commission on Civil Nuclear Cooperation

    Broader source: Energy.gov [DOE]

    The second meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation was held on November 4, 2013 in Washington, D.C.

  20. Status and Early Commissioning Results for the PEP-II High Energy Ring

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect and Early Commissioning Results for the PEP-II High Energy Ring Citation Details In-Document Search Title: Status and Early Commissioning Results for the PEP-II High Energy Ring The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running. Authors:

  1. Fact Sheet: The Fourth Meeting of the U.S.-Japan Bilateral Commission on

    Office of Environmental Management (EM)

    Civil Nuclear Cooperation | Department of Energy Fact Sheet: The Fourth Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation Fact Sheet: The Fourth Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation November 6, 2015 - 1:56pm Addthis Fact Sheet: The Fourth Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation News Media Contact: (202) 586-4940 The fourth meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear

  2. Emergency Petition and Complaint of the District of Columbia Public Service Commission

    Office of Environmental Management (EM)

    DEPARTMENT OF ENERGY AND FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) EMERGENCY PETITION AND COMPLAINT OF THE DISTRICT OF COLUMBIA PUBLIC SERVICE COMMISSION Pursuant to Sections 202(c), 207 and 309 of the Federal Power Act ("FPA"), 16 U.S.C. §§ 824a(c), 824f and 825h, the District of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and

  3. V-094: IBM Multiple Products Multiple Vulnerabilities | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 94: IBM Multiple Products Multiple Vulnerabilities V-094: IBM Multiple Products Multiple Vulnerabilities February 19, 2013 - 1:41am Addthis PROBLEM: IBM Multiple Products Multiple Vulnerabilities PLATFORM: IBM Maximo Asset Management versions 7.5, 7.1, and 6.2 IBM Maximo Asset Management Essentials versions 7.5, 7.1, and 6.2 IBM SmartCloud Control Desk version 7.5 IBM Tivoli Asset Management for IT versions 7.2, 7.1, and 6.2 IBM Tivoli Change and Configuration Management Database

  4. Report of the task force on SSC commissioning and operations

    SciTech Connect (OSTI)

    1985-07-01

    In 1985 January a Taskforce was organized to study the impact of magnet design on the commissioning and operation of the SSC. The results of the study, in the form of this report, are intended as one of several sources of input for the Magnet Type Selection Committee. Other major input will come from the Magnet Taskforce, the Test String Taskforce, the Cost Estimating Taskforce, and other study groups. All of these efforts will culminate in a magnet type selection, after which concentrated R&D on the selected magnet can commence. The study began with a one-week workshop, held on the UC Berkeley campus in 1985 January 14--18. An interim report of the Taskforce, based on the results of the Workshop, was published on 1985 January 28 (SSC-05). With very few exceptions, the work of the Taskforce was carried out by the participants in the Workshop, both during the workshop and in the subsequent weeks. This report is the collective effort of that group, whose very substantial contribution of time, effort, and thought is gratefully acknowledged.

  5. PERFORMANCE OF THE DIAGNOSTICS FOR NSLS-II LINAC COMMISSIONING

    SciTech Connect (OSTI)

    Fliller III, R.; Padrazo, D.; Wang, G.M.; Heese, R.; Hseuh H.-C.; Johanson, M.; Kosciuk, B.N.; Pinayev, I.; Rose, J.; Shaftan, T.; Singh, O.

    2011-03-28

    The National Synchrotron Light Source II (NSLS-II) is a state of the art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The transfer lines not only provide a means to deliver the beam from one machine to another, they also provide a suite of diagnostics and utilities to measure the properties of the beam to be delivered. In this paper we discuss the suite of diagnostics that will be used to commission the NSLS-II linac and measure the beam properties. The linac to booster transfer line can measure the linac emittance with a three screens measurement or a quadrupole scan. Energy and energy spread are measured in a dispersive section. Total charge and charge uniformity are measured with wall current monitors in the linac and transformers in the transfer line. We show that the performance of the diagnostics in the transfer line will be sufficient to ensure the linac meets its specifications and provides a means of trouble shooting and studying the linac in future operation.

  6. SU-E-T-630: Commissioning for SRS Planning Systems

    SciTech Connect (OSTI)

    Pella, S; Smith, C; Leventouri, T; Bacala, A

    2014-06-15

    Purpose: This study will try to find optimal procedures to collect small fields beam data for commissioning in treatment planning systems (TPS), and to provide a protocol to collect output factors for very small field sizes: 0.5 cm 0.5 cm to 4.0 cm 4.0 cm.This will help in determining the correct beam configuration methods in TPS planning intensity modulated radiation therapy (IMRT), and stereotactic radiosurgery SRS using mini multileaf collimation (mMLC). Methods: Data has been collected for a mMLC linear accelerator (linac) Novalis from 0.5 cm 0.5 cm to 10 cm 10 cm (its maximum field size). The TPS chosen is BrainLab, Eclipse and Cyberknife. The beam data collected was modeled and imported in the TPS. Verification plans were generated in solid water to confirm the goodness of the data. 3D and IMRT plans on regular CT scans were generated and verified using Mapcheck. All 3D plans with field sizes above 4 cm 4 cm verified excellent using a distance to agreement of 2 mm and a 2% tolerance. IMRT plans gave an error of -8%. New scans with new detectors have been taken, new field sizes were introduced, and focus has been applied on determining the dosimetric leaf gap. Results: Although this is still a work in progress, this study brings several issues to light: the importance of the correct technique in beam data collection from the correct watertank to the correct detectors. Readings for rectangular fields have to be taken especially for fields which one side is under 4 cm. Conclusion: The use of equivalent square fields will not provide correct readings for the fields with large differences between the length and the width.

  7. Multiple capillary biochemical analyzer

    DOE Patents [OSTI]

    Dovichi, Norman J. (Edmonton, CA); Zhang, Jian Z. (Edmonton, CA)

    1995-01-01

    A multiple capillary analyzer allows detection of light from multiple capillaries with a reduced number of interfaces through which light must pass in detecting light emitted from a sample being analyzed, using a modified sheath flow cuvette. A linear or rectangular array of capillaries is introduced into a rectangular flow chamber. Sheath fluid draws individual sample streams through the cuvette. The capillaries are closely and evenly spaced and held by a transparent retainer in a fixed position in relation to an optical detection system. Collimated sample excitation radiation is applied simultaneously across the ends of the capillaries in the retainer. Light emitted from the excited sample is detected by the optical detection system. The retainer is provided by a transparent chamber having inward slanting end walls. The capillaries are wedged into the chamber. One sideways dimension of the chamber is equal to the diameter of the capillaries and one end to end dimension varies from, at the top of the chamber, slightly greater than the sum of the diameters of the capillaries to, at the bottom of the chamber, slightly smaller than the sum of the diameters of the capillaries. The optical system utilizes optic fibres to deliver light to individual photodetectors, one for each capillary tube. A filter or wavelength division demultiplexer may be used for isolating fluorescence at particular bands.

  8. Multiple capillary biochemical analyzer

    DOE Patents [OSTI]

    Dovichi, N.J.; Zhang, J.Z.

    1995-08-08

    A multiple capillary analyzer allows detection of light from multiple capillaries with a reduced number of interfaces through which light must pass in detecting light emitted from a sample being analyzed, using a modified sheath flow cuvette. A linear or rectangular array of capillaries is introduced into a rectangular flow chamber. Sheath fluid draws individual sample streams through the cuvette. The capillaries are closely and evenly spaced and held by a transparent retainer in a fixed position in relation to an optical detection system. Collimated sample excitation radiation is applied simultaneously across the ends of the capillaries in the retainer. Light emitted from the excited sample is detected by the optical detection system. The retainer is provided by a transparent chamber having inward slanting end walls. The capillaries are wedged into the chamber. One sideways dimension of the chamber is equal to the diameter of the capillaries and one end to end dimension varies from, at the top of the chamber, slightly greater than the sum of the diameters of the capillaries to, at the bottom of the chamber, slightly smaller than the sum of the diameters of the capillaries. The optical system utilizes optic fibers to deliver light to individual photodetectors, one for each capillary tube. A filter or wavelength division demultiplexer may be used for isolating fluorescence at particular bands. 21 figs.

  9. Report to the Legislature on the California Energy Commission's Geothermal Development Grant Program for Local Governments

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This report documents the California Energy Commission's administration of its Geothermal Development Grant Program for Local Governments. The Energy Commission established this program as a result of the passage of Assembly Bill 1905 (Bosco) in 1980. This legislation established the mechanism to distribute the state's share of revenues received from the leasing of federal mineral reserves for geothermal development. The federal government deposits these revenues in the Geothermal Resources Development Account (GRDA) created by AB 1905. The state allocates funds from the GRDA to the California Parklands and Renewable Resources Investment Fund, the counties of origin where the federal leases are located, and the Energy Commission. The legislation further directs the Energy Commission to disburse its share as grants to local governments to assist with the planning and development of geothermal resources. Activities which are eligible for funding under the Energy Commission's grant program include resource development projects, planning and feasibility studies, and activities to mitigate the impacts of existing geothermal development.

  10. Multiple layer insulation cover

    DOE Patents [OSTI]

    Farrell, James J.; Donohoe, Anthony J.

    1981-11-03

    A multiple layer insulation cover for preventing heat loss in, for example, a greenhouse, is disclosed. The cover is comprised of spaced layers of thin foil covered fabric separated from each other by air spaces. The spacing is accomplished by the inflation of spaced air bladders which are integrally formed in the cover and to which the layers of the cover are secured. The bladders are inflated after the cover has been deployed in its intended use to separate the layers of the foil material. The sizes of the material layers are selected to compensate for sagging across the width of the cover so that the desired spacing is uniformly maintained when the cover has been deployed. The bladders are deflated as the cover is stored thereby expediting the storage process and reducing the amount of storage space required.

  11. Multiple-port valve

    DOE Patents [OSTI]

    Doody, Thomas J.

    1978-08-22

    A multiple-port valve assembly is designed to direct flow from a primary conduit into any one of a plurality of secondary conduits as well as to direct a reverse flow. The valve includes two mating hemispherical sockets that rotatably receive a spherical valve plug. The valve plug is attached to the primary conduit and includes diverging passageways from that conduit to a plurality of ports. Each of the ports is alignable wih one or more of a plurality of secondary conduits fitted into one of the hemispherical sockets. The other hemispherical socket includes a slot for the primary conduit such that the conduit's motion along that slot with rotation of the spherical plug about various axes will position the valve-plug ports in respect to the secondary conduits.

  12. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  13. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    SciTech Connect (OSTI)

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  14. TU-C-BRE-05: Clinical Implications of AAA Commissioning Errors and Ability of Common Commissioning ' Credentialing Procedures to Detect Them

    SciTech Connect (OSTI)

    McVicker, A; Oldham, M; Yin, F; Adamson, J

    2014-06-15

    Purpose: To test the ability of the TG-119 commissioning process and RPC credentialing to detect errors in the commissioning process for a commercial Treatment Planning System (TPS). Methods: We introduced commissioning errors into the commissioning process for the Anisotropic Analytical Algorithm (AAA) within the Eclipse TPS. We included errors in Dosimetric Leaf Gap (DLG), electron contamination, flattening filter material, and beam profile measurement with an inappropriately large farmer chamber (simulated using sliding window smoothing of profiles). We then evaluated the clinical impact of these errors on clinical intensity modulated radiation therapy (IMRT) plans (head and neck, low and intermediate risk prostate, mesothelioma, and scalp) by looking at PTV D99, and mean and max OAR dose. Finally, for errors with substantial clinical impact we determined sensitivity of the RPC IMRT film analysis at the midpoint between PTV and OAR using a 4mm distance to agreement metric, and of a 7% TLD dose comparison. We also determined sensitivity of the 3 dose planes of the TG-119 C-shape IMRT phantom using gamma criteria of 3% 3mm. Results: The largest clinical impact came from large changes in the DLG with a change of 1mm resulting in up to a 5% change in the primary PTV D99. This resulted in a discrepancy in the RPC TLDs in the PTVs and OARs of 7.1% and 13.6% respectively, which would have resulted in detection. While use of incorrect flattening filter caused only subtle errors (<1%) in clinical plans, the effect was most pronounced for the RPC TLDs in the OARs (>6%). Conclusion: The AAA commissioning process within the Eclipse TPS is surprisingly robust to user error. When errors do occur, the RPC and TG-119 commissioning credentialing criteria are effective at detecting them; however OAR TLDs are the most sensitive despite the RPC currently excluding them from analysis.

  15. DRAFT FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES

    Broader source: Energy.gov [DOE]

    The Commission has reviewed comments received during the public comment period and revised its draft Final Report Volumes 1 and 2 for final consideration and approval. The revised version of the draft Final Report is available for download below. A public conference call has been set for 1:00 pm, Oct 23rd to discuss the comments received, to receive additional public comment, and to approve the final report. Further details regarding the conference call can be found here and in the Federal Register. Section 319 of the Consolidated Appropriations Act, 2014 (Public Law No. 113-76) directed the Secretary of Energy to establish the Commission to Review the Effectiveness of the National Energy Laboratories. The Commission was charged with reviewing the 17 Department of Energy (DOE) National Laboratories. It was established in May 2014 and held monthly meetings from July 2014 to July 2015. Congress directed the Commission to evaluate the laboratories in terms of their alignment with the Departments strategic priorities, duplication, ability to meet current and future energy and national security challenges, size, and support of other Federal agencies. The Commission was also to review the efficiency and effectiveness of the laboratories, including assessing overhead costs and the impact of DOEs oversight and management approach. Lastly, Congress had several specific questions related to the use of laboratory directed research and development (LDRD) such as the effectiveness of the Departments oversight approach and the extent to which LDRD funding supports recruiting and retention of qualified staff. The Commission separated its charge into two phases. Phase 1 focused on the mission and strategic planning of the laboratories and Phase 2 targets the operation and oversight of the laboratory system. LDRD as it relates to the issues outlined above was considered in both phases of the Commissions task. The Commission issued an Interim Report in February 2015 with its preliminary observations and recommendations.

  16. Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01: Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency Petition and Complaint...

  17. Comments of the Staff of the public utilities commission of the state of

    Energy Savers [EERE]

    California on the interim final rule | Department of Energy of the Staff of the public utilities commission of the state of California on the interim final rule Comments of the Staff of the public utilities commission of the state of California on the interim final rule The Staff of the Public Utilities Commission of the State of California ("CPUC") hereby provides its comments pursuant to the Department of Energy's ("DOE") Interim Final Rule on Coordination of Federal

  18. Example Retro-Commissioning Scope of Work to Include Services as Part of an

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC Investment-Grade Audit | Department of Energy Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Document offers a sample statement of work that includes retro-commissioning as part of an energy savings performance contract (ESPC) investment-grade audit. Microsoft Office document icon ph2example_retro_12.doc More Documents &

  19. Factsheet: Second Meeting of the United States-Japan Bilateral Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Civil Nuclear Cooperation | Department of Energy Factsheet: Second Meeting of the United States-Japan Bilateral Commission on Civil Nuclear Cooperation Factsheet: Second Meeting of the United States-Japan Bilateral Commission on Civil Nuclear Cooperation November 4, 2013 - 8:30pm Addthis News Media Contact (202) 586-4940 The second meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation was held on November 4, 2013 in Washington, D.C, with U.S. Deputy Secretary of

  20. Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting March 3, 2010 - 12:00am Addthis Washington, D.C. - On Thursday, March 25th and Friday, March 26th, the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former National Security Advisor General Brent Scowcroft, will hold its first meeting in Washington, D.C. At the direction

  1. Blue Ribbon Commission on America's Nuclear Future Report to the Secretary

    Energy Savers [EERE]

    of Energy | Department of Energy Blue Ribbon Commission on America's Nuclear Future Report to the Secretary of Energy Blue Ribbon Commission on America's Nuclear Future Report to the Secretary of Energy The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was cochaired by Rep. Lee H.

  2. Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission on Civil

    Office of Environmental Management (EM)

    Nuclear Cooperation | Department of Energy Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation June 13, 2014 - 7:48am Addthis NEWS MEDIA CONTACT 202-586-4940 The third meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation was held on June 12, 2014 in Tokyo, with Japan's Deputy Minister for Foreign Affairs Shinsuke Sugiyama and U.S. Deputy

  3. Multiple stage railgun

    DOE Patents [OSTI]

    Hawke, Ronald S. (Livermore, CA); Scudder, Jonathan K. (Pleasanton, CA); Aaland, Kristian (Livermore, CA)

    1982-01-01

    A multiple stage magnetic railgun accelerator (10) for accelerating a projectile (15) by movement of a plasma arc (13) along the rails (11,12). The railgun (10) is divided into a plurality of successive rail stages (10a-n) which are sequentially energized by separate energy sources (14a-n) as the projectile (15) moves through the bore (17) of the railgun (10). Propagation of energy from an energized rail stage back towards the breech end (29) of the railgun (10) can be prevented by connection of the energy sources (14a-n) to the rails (11,12) through isolation diodes (34a-n). Propagation of energy from an energized rail stage back towards the breech end of the railgun can also be prevented by dividing the rails (11,12) into electrically isolated rail sections (11a-n, 12a-n). In such case means (55a-n) are used to extinguish the arc at the end of each energized stage and a fuse (31) or laser device (61) is used to initiate a new plasma arc in the next energized rail stage.

  4. Supporting Multiple Workloads, Batch Systems,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Multiple Workloads, Batch Systems, and Computing Environments on a Single Linux Cluster Larry Pezzaglia National Energy Research Scientific Computing Center Lawrence...

  5. Sigmund and WInterbon Multiple Scattering

    Energy Science and Technology Software Center (OSTI)

    1985-03-01

    SWIMS calculates the angular dispersion of ion beams that undergo small-angle, incoherent multiple scattering by gaseous or solid media.

  6. H.R.S. 269 - Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: H.R.S. 269 - Public Utilities CommissionLegal Abstract This section of the Hawaii Revised...

  7. Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The third meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation was held on June 12, 2014 in Tokyo, with Japan's Deputy Minister for Foreign Affairs Shinsuke ...

  8. Energy and Cost Savings of Retro-Commissioning and Retrofit Measures for Large Office Buildings

    SciTech Connect (OSTI)

    Wang, Weimin; Zhang, Jian; Moser, Dave; Liu, Guopeng; Athalye, Rahul A.; Liu, Bing

    2012-08-03

    This paper evaluates the energy and cost savings of seven retro-commissioning measures and 29 retrofit measures applicable to most large office buildings. The baseline model is for a hypothetical building with characteristics of large office buildings constructed before 1980. Each retro-commissioning measure is evaluated against the original baseline in terms of its potential of energy and cost savings while each retrofit measure is evaluated against the commissioned building. All measures are evaluated in five locations (Miami, Las Vegas, Seattle, Chicago and Duluth) to understand the impact of weather conditions on energy and cost savings. The results show that implementation of the seven operation and maintenance measures as part of a retro-commissioning process can yield an average of about 22% of energy use reduction and 14% of energy cost reduction. Widening zone temperature deadband, lowering VAV terminal minimum air flow set points and lighting upgrades are effective retrofit measures to be considered.

  9. 20 AAC 25 Alaska Oil and Gas Conservation Commission | Open Energy...

    Open Energy Info (EERE)

    AAC 25 Alaska Oil and Gas Conservation Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 20 AAC 25 Alaska Oil and...

  10. NMAC 19.34.3 Wildlife Habitat and Lands Use of State Game Commission...

    Open Energy Info (EERE)

    Mexico state game commission with the authority to acquire lands, to provide for use of game and fish for use and development for public recreation. Published NA Year Signed or...

  11. NM Stat. 62-11 - Review of Commission Orders | Open Energy Information

    Open Energy Info (EERE)

    NM Stat. 62-11 - Review of Commission Orders Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NM Stat. 62-11 - Review of...

  12. UC 54-4 - Authority of Commission Over Public Utilities | Open...

    Open Energy Info (EERE)

    4 - Authority of Commission Over Public Utilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: UC 54-4 - Authority of...

  13. Utah UC 54-4, Authority of Commission Over Public Utilities ...

    Open Energy Info (EERE)

    4, Authority of Commission Over Public Utilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Utah UC 54-4, Authority of...

  14. AAC R14-3 - Corporation Commission Rules of Practice and Procedure...

    Open Energy Info (EERE)

    3 - Corporation Commission Rules of Practice and Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: AAC R14-3 -...

  15. Impacts of Modeled Recommendations of the National Commission on Energy Policy

    Reports and Publications (EIA)

    2005-01-01

    This report provides the Energy Information Administration's analysis of those National Commission on Energy Policy (NCEP) energy policy recommendations that could be simulated using the National Energy Modeling System (NEMS).

  16. Researcher Supported by Atomic Energy Commission and U.S. Department...

    Energy Savers [EERE]

    Of 2008 Nobel Prize in Physics Researcher Supported by Atomic Energy Commission and U.S. Department of Energy is Co-Winner Of 2008 Nobel Prize in Physics October 7, 2008 - 4:14pm ...

  17. NMAC 1.2.2 Public Regulations Commission Rules of Procedure ...

    Open Energy Info (EERE)

    NMAC 1.2.2 Public Regulations Commission Rules of Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 1.2.2...

  18. 1 NMAC 2.2 - Public Regulation Commission Rules of Procedure...

    Open Energy Info (EERE)

    NMAC 2.2 - Public Regulation Commission Rules of Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 1 NMAC 2.2 -...

  19. 2 CCR State Lands Commission Article 4.1, Leases for Exploration...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 2 CCR State Lands Commission Article 4.1, Leases for Exploration and Development of...

  20. NMS 74-6-4 Duties and Powers of the Water Quality Control Commission...

    Open Energy Info (EERE)

    -4 Duties and Powers of the Water Quality Control Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NMS 74-6-4 Duties...

  1. U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Container CARLSBAD, N.M., November 20, 2000 - The U.S. Nuclear Regulatory Commission (NRC) issued a Certificate of Compliance November 2 for the HalfPACT transportation...

  2. Colorado - C.R.S. 24-65.1-108, State Agency or Commission Responses...

    Open Energy Info (EERE)

    Colorado - C.R.S. 24-65.1-108, State Agency or Commission Responses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Colorado -...

  3. I.C. 62-6 - Procedure Before Commission and in Courts | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 62-6 - Procedure Before Commission and in CourtsLegal Abstract This statute governs...

  4. Colorado - C.R.S. 40-2-101 et seq., Public Utility Commission...

    Open Energy Info (EERE)

    Colorado - C.R.S. 40-2-101 et seq., Public Utility Commission - Renewable Energy Standard Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  5. Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission...

    Broader source: Energy.gov (indexed) [DOE]

    NEWS MEDIA CONTACT 202-586-4940 The third meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation was held on June 12, 2014 in Tokyo, with Japan's Deputy...

  6. Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Technical Assistance Program and SEE Action hosted this webinar on August 30, 2012, on retro-commissioning for energy efficiency in commercial buildings.

  7. Commissioning of a microprobe-XRF beamline (BL-16) on Indus-2 synchrotron source

    SciTech Connect (OSTI)

    Tiwari, M. K.; Gupta, P.; Sinha, A. K.; Garg, C. K.; Singh, A. K.; Kane, S. R.; Garg, S. R.; Lodha, G. S.

    2012-06-05

    We report commissioning of the microprobe-XRF beamline on Indus-2 synchrotron source. The beamline has been recently made operational and is now open for the user's experiments. The beamline comprises of Si(111) double crystal monochromator and Kirkpatrick-Baez focusing optics. The beamline covers wide photon energy range of 4 - 20 keV using both collimated and micro-focused beam modes. The design details and the first commissioning results obtained using this beamline are presented.

  8. Design and Commissioning of a Wind Tunnel for Integrated Physical and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chemical Measurements of PM Dispersing Plume of Heavy Duty Diesel Truck | Department of Energy Commissioning of a Wind Tunnel for Integrated Physical and Chemical Measurements of PM Dispersing Plume of Heavy Duty Diesel Truck Design and Commissioning of a Wind Tunnel for Integrated Physical and Chemical Measurements of PM Dispersing Plume of Heavy Duty Diesel Truck Presents plume characterization of three vehicles with different aftertreatment configuration, representative of legacy, current

  9. Letter on the Final Report of the Commission to review the Effectiveness of

    Energy Savers [EERE]

    the National Energy Laboratories | Department of Energy Final Report of the Commission to review the Effectiveness of the National Energy Laboratories Letter on the Final Report of the Commission to review the Effectiveness of the National Energy Laboratories The SEAB National Laboratory Task Force has been charged to review studies of the DOE National Laboratories as they appear and to give you advice about what your response should be to their findings and recommendations. This Draft SEAB

  10. Letter on the Interim Report of the Commission to Review the Effectiveness

    Energy Savers [EERE]

    of the National Energy Laboratories | Department of Energy Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Letter on the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories The SEAB Task Force on DOE National Laboratories was established by the Secretary of Energy on June 16, 2014, to provide advice, guidance, and recommendations on important issues related to improving the health and management of

  11. Memorandum on the Interim Report of the Commission to Review the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Effectiveness of the National Energy Laboratories | Department of Energy the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Memorandum on the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories The SEAB Task Force on DOE National Laboratories was established by the Secretary of Energy on June 16, 2014, to provide advice, guidance, and recommendations on important issues related to improving the

  12. UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO

    Office of Legacy Management (LM)

    OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO TRANSFER,DELIVER,EXPORT,OR RECEIVE URANIUM ORTHORIUM SOURCE MATERIAL Pursuant to Code of Federal Regulations. Title II- Atomic Energy. Part IO-Control of Source Material Form approved Budget Bureau No. 3%RO02.2. 2. PREVIOUS AEC LICENSE NUMBER, IF ANY. R-103 _..._............_.~_~~......~~~.....~.. INSTRUCTIONS File two (2) copies of this application with the U. S. Atomic Energy Commission, P. 0. Box 30, Ansonia Station, New York

  13. Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on Americas Nuclear Future

    SciTech Connect (OSTI)

    Williams, Laura S.

    2011-05-25

    To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

  14. Aerial Measuring System (AMS)/Israel Atomic Energy Commission (IAEC) Joint Comparison Study Report

    SciTech Connect (OSTI)

    Wasiolek, P.; Halevy, I.

    2013-12-23

    Under the 13th Bilateral Meeting to Combat Nuclear Terrorism conducted on January 89, 2013, the committee approved the development of a cost-effective proposal to conduct a Comparison Study of the Aerial Measuring System (AMS) of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) and Israel Atomic Energy Commission (IAEC). The study was to be held at the Remote Sensing Laboratory (RSL), Nellis Air Force Base, Las Vegas, Nevada, with measurements at the Nevada National Security Site (NNSS). The goal of the AMS and the IAEC joint survey was to compare the responses of the two agencies aerial radiation detection systems to varied radioactive surface contamination levels and isotopic composition experienced at the NNSS, and the differing data processing techniques utilized by the respective teams. Considering that for the comparison both teams were using custom designed and built systems, the main focus of the short campaign was to investigate the impact of the detector size and data analysis techniques used by both teams. The AMS system, SPectral Advanced Radiological Computer System, Model A (SPARCS-A), designed and built by RSL, incorporates four different size sodium iodide (NaI) crystals: 1" 1", 2" 4" 4", 2" 4" 16", and an up-looking 2" 4" 4". The Israel AMS System, Air RAM 2000, was designed by the IAEC Nuclear Research Center Negev (NRCN) and built commercially by ROTEM Industries (Israel) and incorporates two 2" diameter 2" long NaI crystals. The operational comparison was conducted at RSL-Nellis in Las Vegas, Nevada, during week of June 2427, 2013. The Israeli system, Air RAM 2000, was shipped to RSL-Nellis and mounted together with the DOE SPARCS on a DOE Bell-412 helicopter for a series of aerial comparison measurements at local test ranges, including the Desert Rock Airport and Area 3 at the NNSS. A 4-person Israeli team from the IAEC NRCN supported the activity together with 11 members of the RSL team, which consisted of pilots, mechanics, scientists, a data analyst, equipment operators, and operation specialists. All planned flight activities followed by scientific discussions on the collected data were completed. For IAEC, the joint survey provided an opportunity to characterize their systems response to extended sources of various fission products at the NNSS. As both systems play an important role in their respective countries (United States and Israel) national framework of radiological emergency response and are subject to multiple mutual cooperation agreements, it was important for each country to obtain more thorough knowledge of how they would employ these important assets and define the roles that they would each play in an actual response.

  15. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    SciTech Connect (OSTI)

    Cohon, Jared L.; Glauthier, T. J.; Augustine, Norman R.; Austin, Wanda M.; Elachi, Charles; Fleury, Paul A.; Hockfield, Susan J.; Meserve, Richard A.; Murray, Cherry A.

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOEs mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  16. Multiple Motivations Institutional Change Principle

    Broader source: Energy.gov [DOE]

    The multiple motivations principle suggests that a portfolio approach—rather than a single strategy—may be required to achieve change. Research demonstrates that people and institutions adopt new...

  17. V-092: Pidgin Multiple Vulnerabilities

    Broader source: Energy.gov [DOE]

    Multiple vulnerabilities have been reported in Pidgin, which can be exploited by malicious people to manipulate certain data, cause a DoS (Denial of Service), and compromise a user's system.

  18. Safe operating conditions for NSLS-II Storage Ring Frontends commissioning

    SciTech Connect (OSTI)

    Seletskiy, S.; Amundsen, C.; Ha, K.; Hussein, A.

    2015-04-02

    The NSLS-II Storage Ring Frontends are designed to safely accept the synchrotron radiation fan produced by respective insertion device when the electron beam orbit through the ID is locked inside the predefined Active Interlock Envelope. The Active Interlock is getting enabled at a particular beam current known as AI safe current limit. Below such current the beam orbit can be anywhere within the limits of the SR beam acceptance. During the FE commissioning the beam orbit is getting intentionally disturbed in the particular ID. In this paper we explore safe operating conditions for the Frontends commissioning.

  19. Winning the Future: Navajo-Hopi Land Commission Leverages DOE Grant to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advance Solar Ranch Project | Department of Energy Navajo-Hopi Land Commission Leverages DOE Grant to Advance Solar Ranch Project Winning the Future: Navajo-Hopi Land Commission Leverages DOE Grant to Advance Solar Ranch Project October 22, 2015 - 12:04pm Addthis 08022_winningthefuture.jpg Under the Navajo-Hopi Land Settlement Act of 1974, the Paragon-Bisti Ranch was set aside for the benefit of Navajo families (relocatees) living on Hopi Partitioned Lands. Now, more than 40 years later, the

  20. Secretary Moniz's Remarks on "A Look Back on the Blue Ribbon Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on America's Nuclear Future" at the Bipartisan Policy Center -- As Delivered | Department of Energy "A Look Back on the Blue Ribbon Commission on America's Nuclear Future" at the Bipartisan Policy Center -- As Delivered Secretary Moniz's Remarks on "A Look Back on the Blue Ribbon Commission on America's Nuclear Future" at the Bipartisan Policy Center -- As Delivered March 24, 2015 - 1:30pm Addthis Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy Thank you,

  1. Researcher Supported by Atomic Energy Commission and U.S. Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy is Co-Winner Of 2008 Nobel Prize in Physics | Department of Energy Atomic Energy Commission and U.S. Department of Energy is Co-Winner Of 2008 Nobel Prize in Physics Researcher Supported by Atomic Energy Commission and U.S. Department of Energy is Co-Winner Of 2008 Nobel Prize in Physics October 7, 2008 - 4:14pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Under Secretary for Science Raymond L. Orbach today congratulated Yoichiro Nambu of the United States and Makoto

  2. District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco

    Energy Savers [EERE]

    Response to the City of Alexandria's Supplemental Comments | Department of Energy District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments Docket No. EO-05-01: In accordance with Order No. 202-06-01, issued by the Department of Energy ("DOE") on February 17, 2006, Potomac

  3. Commissioning and Early Operation Experience of the NSLS-II Storage Ring RF System

    SciTech Connect (OSTI)

    Gao, F.; Rose, J.; Cupolo, J.; Dilgen, T.; Rose, B.; Gash, W.; Ravindranath, V.; Yeddulla, M.; Papu, J.; Davila, P.; Holub, B.; Tagger, J.; Sikora, R.; Ramirez, G.; Kulpin, J.

    2015-05-03

    The National Synchrotron Light Source II (NSLS-II) is a 3 GeV electron X-ray user facility commissioned in 2014. The storage ring RF system, essential for replenishing energy loss per turn of the electrons, consists of digital low level RF controllers, 310 kW CW klystron transmitters, CESR-B type superconducting cavities, as well as a supporting cryogenic system. Here we will report on RF commissioning and early operation experience of the system for beam current up to 200mA.

  4. Status and Early Commissioning Results for the PEP-II High Energy Ring

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect and Early Commissioning Results for the PEP-II High Energy Ring Citation Details In-Document Search Title: Status and Early Commissioning Results for the PEP-II High Energy Ring × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy

  5. Head of UN Economic Commission for Europe: "Capture the Carbon" |

    Office of Environmental Management (EM)

    Department of Energy Head of UN Economic Commission for Europe: "Capture the Carbon" Head of UN Economic Commission for Europe: "Capture the Carbon" January 13, 2015 - 10:40am Addthis Dr. Julio Friedmann Dr. Julio Friedmann Principal Deputy Assistant Secretary for Fossil Energy Visit CCSNetwork for more information on CCS in Europe. The increased urgency of global climate change has focused the attention of many leaders around the world. While the Department of Energy

  6. ATOMIC ENERGY COMMISSION Refer to File No. AEGR-1 The CommandinS Officer '

    Office of Legacy Management (LM)

    *>I ' { q;' ' y,,",' T 3 ,> 0 ,I- \! - . :. p EPA L ,v " _ ' . \ / UNITED STATES , . .- . t ATOMIC ENERGY COMMISSION Refer to File No. AEGR-1 . The CommandinS Officer ' Ltaricn Zngineer Depot Marion, Ohio Dear Sir: Subject: REPORT CF F2GIATICN ' SUEiVZY radiation Transmitted herewith, in duplicate, is a report of the su,rveg made at your Znstallation April 17, 1947 by Messrs. Russell Hayes and Ellery Storm of the Rochester Project, United States Atomic Energy Commission. ~~~ j/p

  7. Public Meeting Commission Members TJ Glauthier, Co-Chair; Jared Cohon, Co-Chair; Charles Elachi; Richard Meserve;

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minutes of the U.S. Department of Energy (DOE) Commission to Review the Effectiveness of the National Energy Laboratories Public Meeting Commission Members TJ Glauthier, Co-Chair; Jared Cohon, Co-Chair; Charles Elachi; Richard Meserve; in Attendance: Wanda Austin; Paul Fleury Date and Time: 9:00 AM - 4:30 PM, October 6, 2014 Location: Institute for Defense Analysis, IDA Mark Center, Room 1301, 4850 Mark Center Drive, Alexandria, VA Purpose: Meeting of the Commission to Review the Effectiveness

  8. The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit, OAS-FS-13-03

    Energy Savers [EERE]

    Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-03 November 2012 Department of Energy Washington, DC 20585 November 15, 2012 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent

  9. Multiple resonant railgun power supply

    DOE Patents [OSTI]

    Honig, Emanuel M. (Los Alamos, NM); Nunnally, William C. (Los Alamos, NM)

    1988-01-01

    A multiple repetitive resonant railgun power supply provides energy for repetitively propelling projectiles from a pair of parallel rails. A plurality of serially connected paired parallel rails are powered by similar power supplies. Each supply comprises an energy storage capacitor, a storage inductor to form a resonant circuit with the energy storage capacitor and a magnetic switch to transfer energy between the resonant circuit and the pair of parallel rails for the propelling of projectiles. The multiple serial operation permits relatively small energy components to deliver overall relatively large amounts of energy to the projectiles being propelled.

  10. Multiple resonant railgun power supply

    DOE Patents [OSTI]

    Honig, E.M.; Nunnally, W.C.

    1985-06-19

    A multiple repetitive resonant railgun power supply provides energy for repetitively propelling projectiles from a pair of parallel rails. A plurality of serially connected paired parallel rails are powered by similar power supplies. Each supply comprises an energy storage capacitor, a storage inductor to form a resonant circuit with the energy storage capacitor and a magnetic switch to transfer energy between the resonant circuit and the pair of parallel rails for the propelling of projectiles. The multiple serial operation permits relatively small energy components to deliver overall relatively large amounts of energy to the projectiles being propelled.

  11. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    SciTech Connect (OSTI)

    Not Available

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities.

  12. State Commission electricity regulation under Federal Greenhouse gas cap-and-trade policy

    SciTech Connect (OSTI)

    Keeler, Andrew G.

    2008-05-15

    Given the current uncertainty about the timing and severity of greenhouse gas constraints on electric generation that will result from a federal program, commissions need to begin crafting strategies and procedures to best serve the public interest in this new environment. (author)

  13. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    SciTech Connect (OSTI)

    Mills, Evan

    2009-07-16

    The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems

  14. FERC hears gas industry concerns, announces Transco settlement. [Federal Energy Regulatory Commission

    SciTech Connect (OSTI)

    Rodgers, L.M.

    1991-07-01

    This article examines the industry comments on the Federal Energy Regulatory Commission's (FERC) notice of proposed rulemaking on natural gas pipeline function and comparability of service and the resolution of a charge of violations of regulations against the Transcontinental Gas Pipe Line Corporation by the FERC's Office of the General Council.

  15. Joint statement of the European Commission's Joint Research Centre and the

    National Nuclear Security Administration (NNSA)

    United States Department of Energy's National Nuclear Security Administration regarding the reduction of excess nuclear material | National Nuclear Security Administration statement of the European Commission's Joint Research Centre and the United States Department of Energy's National Nuclear Security Administration regarding the reduction of excess nuclear material | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile

  16. Multiple Mechanisms of Uranium Immobilization by Cellulomonas...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Multiple Mechanisms of Uranium Immobilization by Cellulomonas sp. Strain ES6 Citation Details In-Document Search Title: Multiple Mechanisms of Uranium ...

  17. SU-E-T-577: Commissioning of a Deterministic Algorithm for External Photon Beams

    SciTech Connect (OSTI)

    Zhu, T; Finlay, J; Mesina, C; Liu, H

    2014-06-01

    Purpose: We report commissioning results for a deterministic algorithm for external photon beam treatment planning. A deterministic algorithm solves the radiation transport equations directly using a finite difference method, thus improve the accuracy of dose calculation, particularly under heterogeneous conditions with results similar to that of Monte Carlo (MC) simulation. Methods: Commissioning data for photon energies 6 15 MV includes the percentage depth dose (PDD) measured at SSD = 90 cm and output ratio in water (Spc), both normalized to 10 cm depth, for field sizes between 2 and 40 cm and depths between 0 and 40 cm. Off-axis ratio (OAR) for the same set of field sizes was used at 5 depths (dmax, 5, 10, 20, 30 cm). The final model was compared with the commissioning data as well as additional benchmark data. The benchmark data includes dose per MU determined for 17 points for SSD between 80 and 110 cm, depth between 5 and 20 cm, and lateral offset of up to 16.5 cm. Relative comparisons were made in a heterogeneous phantom made of cork and solid water. Results: Compared to the commissioning beam data, the agreement are generally better than 2% with large errors (up to 13%) observed in the buildup regions of the FDD and penumbra regions of the OAR profiles. The overall mean standard deviation is 0.04% when all data are taken into account. Compared to the benchmark data, the agreements are generally better than 2%. Relative comparison in heterogeneous phantom is in general better than 4%. Conclusion: A commercial deterministic algorithm was commissioned for megavoltage photon beams. In a homogeneous medium, the agreement between the algorithm and measurement at the benchmark points is generally better than 2%. The dose accuracy for a deterministic algorithm is better than a convolution algorithm in heterogeneous medium.

  18. Multiple Exciton Generation Solar Cells

    SciTech Connect (OSTI)

    Luther, J. M.; Semonin, O. E.; Beard, M. C.; Gao, J.; Nozik, A. J.

    2012-01-01

    Heat loss is the major factor limiting traditional single junction solar cells to a theoretical efficiency of 32%. Multiple Exciton Generation (MEG) enables efficient use of the solar spectrum yielding a theoretical power conversion efficiency of 44% in solar cells under 1-sun conditions. Quantum-confined semiconductors have demonstrated the ability to generate multiple carriers but present-day materials deliver efficiencies far below the SQ limit of 32%. Semiconductor quantum dots of PbSe and PbS provide an active testbed for developing high-efficiency, inexpensive solar cells benefitting from quantum confinement effects. Here, we will present recent work of solar cells employing MEG to yield external quantum efficiencies exceeding 100%.

  19. V-161: IBM Maximo Asset Management Products Java Multiple Vulnerabilit...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Articles U-179: IBM Java 7 Multiple Vulnerabilities V-145: IBM Tivoli Federated Identity Manager Products Java Multiple Vulnerabilities V-094: IBM Multiple Products Multiple...

  20. Multiple target laser ablation system

    DOE Patents [OSTI]

    Mashburn, Douglas N. (Knoxville, TN)

    1996-01-01

    A laser ablation apparatus and method are provided in which multiple targets consisting of material to be ablated are mounted on a movable support. The material transfer rate is determined for each target material, and these rates are stored in a controller. A position detector determines which target material is in a position to be ablated, and then the controller controls the beam trigger timing and energy level to achieve a desired proportion of each constituent material in the resulting film.

  1. Multiple target laser ablation system

    DOE Patents [OSTI]

    Mashburn, D.N.

    1996-01-09

    A laser ablation apparatus and method are provided in which multiple targets consisting of material to be ablated are mounted on a movable support. The material transfer rate is determined for each target material, and these rates are stored in a controller. A position detector determines which target material is in a position to be ablated, and then the controller controls the beam trigger timing and energy level to achieve a desired proportion of each constituent material in the resulting film. 3 figs.

  2. The Commissioning Results of the First Beamline at the Siam Photon Laboratory

    SciTech Connect (OSTI)

    Songsiriritthigul, Prayoon; Pairsuwan, W.; Ishii, T.; Nakajima, H.; Kantee, S.; Wongkokua, W.; Kakizaki, A.

    2004-05-12

    The commissioning results obtained from the first beamline of the Siam Photon Source are reported. The beamline is a VUV beamline in which light is monochromatized over the energy range between 20-240 eV. The wavelength calibration was carried out by photoemission measurements using the Fermi edge of gold as the standard. The optical beamline and the experimental station have been tested while the Siam Photon Source was still in the commissioning period. This gave rise to undesirable problems: the large electron beam size, the beam instability and the following intensity fluctuation. Such problem has been overcome up to the present. The photoemission measurements are being carried out on Ni(111)

  3. Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015

    Broader source: Energy.gov [DOE]

    The final public meeting of the Commission will begin at 1:00 p.m. on October 23, 2015 in the form of a Conference Call. The tentative meeting agenda includes discussion on the draft Final Report of the Commission. The Commissioners will address comments they have received on the report and hear any additional comments from members of the public on the Conference Call. The meeting is scheduled to conclude at 2:00 p.m. Agenda updates will be posted to this page. Public Participation: The meeting is open to the public. Individuals who would like to participate in the teleconference must RSVP to Karen Gibson no later than 12:00 noon on Thursday, October 22, 2015 at crenel@hq.doe.gov. Please provide your name, organization, contact information, and indicate if you wish to offer comments on the report during the teleconference. You will be provided with the call-in number and passcode.

  4. Test bench to commission a third ion source beam line and a newly designed extraction system

    SciTech Connect (OSTI)

    Winkelmann, T.; Cee, R.; Haberer, T.; Naas, B.; Peters, A.

    2012-02-15

    The HIT (Heidelberg Ion Beam Therapy Center) is the first hospital-based treatment facility in Europe where patients can be irradiated with protons and carbon ions. Since the commissioning starting in 2006 two 14.5 GHz electron cyclotron resonance ion sources are routinely used to produce a variety of ion beams from protons up to oxygen. In the future a helium beam for regular patient treatment is requested, therefore a third ion source (Supernanogan source from PANTECHNIK S.A.) will be integrated. This third ECR source with a newly designed extraction system and a spectrometer line is installed at a test bench at HIT to commission and validate this section. Measurements with different extraction system setups will be presented to show the improvement of beam quality for helium, proton, and carbon beams. An outlook to the possible integration scheme of the new ion source into the production facility will be discussed.

  5. Beam On Target! - CEBAF Accelerator Achieves 12 GeV Commissioning Milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Jefferson Lab Beam On Target! CEBAF Accelerator Achieves 12 GeV Commissioning Milestone The accelerator crew on hand The accelerator crew on hand for the beam-on-target achievement included (l-r) Crew Chief Mike McCaughan, Accelerator Operators Dan Moser and Brandi Cade. Yves Roblin was the Accelerator Physics Experimental Liaison for the Hall A beamline, Accelerator Scientist Yan Wang recorded and provided insight into machine performance, and Program Deputy Arne Freyberger ran the show

  6. Transportation Security Rulemaking Activities at the U.S. Nuclear Regulatory Commission

    Office of Environmental Management (EM)

    AT THE U.S. NUCLEAR REGULATORY COMMISSION R. Clyde Ragland, P.E. Office of Nuclear Security and Incident Response 2011 DOE National Transportation Stakeholders Forum May 11, 2011 2 NRC Focus Prior to September 11, 2001 * Historically, NRC Transportation Security Regulations Focused on Highest Risk Radioactive Material, consisted of Special Nuclear Material (SNM) and Spent Nuclear Fuel (SNF) NRC Actions Since September 11, 2001 * Domestically, reviewed materials transported by NRC licensees and

  7. Pamela Link, McLean County Commission Chairperson, U.S. Department of

    Broader source: Energy.gov (indexed) [DOE]

    Pamela Link, McLean County Commission Chairperson, U.S. Department of Energy, Quadrennial Energy Review Public Meeting: "Infrastructure Constraints" Workforce Development Panel, Bismarck, North Dakota, Aug. 8, 2014 Good morning Secretary Moniz, Senator Heitkamp, members of the panel and distinguished guests. Thank you very much for the opportunity to take part in today's essential discussions - which could help to advance balanced, responsible energy and infrastructure policies, bring

  8. Retro-commissioning Sensor Suitcase Technology-to-Market Pilot Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro-commissioning Sensor Suitcase Technology-to-Market Pilot Project 2015 Building Technologies Office Peer Review Mike Brambley, PNNL Michael.Brambley@pnnl.gov Jessica Granderson, LBNL JGranderson@lbl.gov Technology-to-Market Program Year 1 Overview � * T2M Project Must-Haves * Lab/Industry Partnerships - Strategic plan for addressing * Budget: $2M DOE/BTO funding technical, commercialization with industry cost share; jointly and manufacturing barriers managed by Emerging - Cost share and

  9. Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007

    Office of Environmental Management (EM)

    National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND

  10. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect (OSTI)

    2012-01-01

    Preamble The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commission’s findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.

  11. Commission. The Nuclear Materials Management and Safeguards System (NMMSS) 2014 Annual Users

    National Nuclear Security Administration (NNSA)

    April 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The Nuclear Materials Management and Safeguards System (NMMSS) 2014 Annual Users Training Meeting will be held May 12-15, 2014, in Denver, Colorado. NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and commercial nuclear facilities. The data serve a critical

  12. STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI CLEAN WATER COMMISSION

    National Nuclear Security Administration (NNSA)

    STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI CLEAN WATER COMMISSION MISSOURI STATE OPERATING PERMIT In compliance with the Missouri Clean Water Law, (Chapter 644 R.S. Mo. as amended, hereinafter, the Law), and the Federal Water Pollution Control Act (Public Law 92-500, 92 nd Congress) as amended, Permit No.: MO-0004863 Owner: United States Department of Energy (USDOE) Address: P.O. Box 410202, Kansas City, MO 64141-0202 Continuing Authority: United States Department of Energy

  13. Commissioning and first operational experience with the biomass fired boiler at Sonderjyllands Hojspaendingsvaerk

    SciTech Connect (OSTI)

    Ramsgaard-Nielsen, C.

    1998-07-01

    The biomass boiler plant at Sonderjyllands Hojspaendingsvaerk consists of a Benson type boiler with a screw stoker/vibration grate combustion system generating 120 t/h of steam at 200 bar and 470 C, which is finally superheated to 542 C in a separate wood chip fired superheater with a spreaderstoker/vibration grate combustion system. The biomass boiler is coupled to the 660 MW coal fired power plant Ensted 3 (EV3) on the water/steam side, and it generates 41 MW at a net electrical efficiency of 40%. Building of the biomass boiler plant at Sonderjyllands Hojspaendingsvaerk was decided by the ELSAM power pool in December 1994, and the erection of the plant was completed in the autumn 1997. Commissioning started in the summer of 1997. This paper describes the plant with focus on the biomass handling and combustion systems and the water/steam coupling to EV3. The plant description is followed by a description of the commissioning phases and the commissioning experience with fuel handling and combustion systems. Finally, the first operational experience is described.

  14. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

    SciTech Connect (OSTI)

    Mills, Evan; Mathew, Paul

    2009-04-01

    Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A total of 1120 deficiency-intervention combinations were identified in the course of commissioning the projects described in this report. The most common location of deficiencies was in HVAC equipment (65% of sites), followed by air-handling and distributions systems (59%), cooling plant (29%), heating plants (24%), and terminal units (24%). The most common interventions were adjusting setpoints, modifying sequences of operations, calibration, and various mechanical fixes (each done in about two-thirds of the sites). The normalized rate of occurrence of deficiencies and corresponding interventions ranged from about 0.1/100ksf to 10/100ksf, depending on the issue. From these interventions flowed significant and highly cost-effective energy savings For the MBCx cohort, source energy savings of 22 kBTU/sf-year (10%) were achieved, with a range of 2% to 25%. Median electricity savings were 1.9 kWh/sf-year (9%), with a range of 1% to 17%. Peak electrical demand savings were 0.2 W/sf-year (4%), with a range of 3% to 11%. The aggregate commissioning cost for the 24 projects was $2.9 million. We observed a range of normalized costs from $0.37 to 1.62/sf, with a median value of $1.00/sf for buildings that implemented MBCx projects. Per the program design, monitoring costs as a percentage of total costs are significantly higher in MBCx projects (median value 40%) than typical commissioning projects included in the Meta-analysis (median value of 2% in the commissioning database). Half of the projects were in buildings containing complex and energy-intensive laboratory space, with higher associated costs. Median energy cost savings were $0.25/sf-year, for a median simple payback time of 2.5 years. Significant and cost-effective energy savings were thus obtained. The greatest absolute energy savings and shortest payback times were achieved in laboratory-type facilities. While impacts varied from project to project, on a portfolio basis we find MBCx to be a highly cost-effective means of obtaining significant program-level energy savings across a variety of building types. Energy savings are ex

  15. Universality of Charged Multiplicity Distributions

    SciTech Connect (OSTI)

    Goulianos, K.; /Rockefeller U.

    1981-12-01

    The charged multiplicity distributions of the diffractive and non-diffractive components of hadronic interactions, as well as those of hadronic states produced in other reactions, are described well by a universal Gaussian function that depends only on the available mass for pionization, has a maximum at n{sub o} {approx_equal} 2M{sup 1/2}, where M is the available mass in GeV, and a peak to width ratio n{sub o}/D {approx_equal} 2.

  16. Multiple piece turbine rotor blade

    DOE Patents [OSTI]

    Jones, Russell B; Fedock, John A

    2013-05-21

    A multiple piece turbine rotor blade with a shell having an airfoil shape and secured between a spar and a platform with the spar including a tip end piece. a snap ring fits around the spar and abuts against the spar tip end piece on a top side and abuts against a shell on the bottom side so that the centrifugal loads from the shell is passed through the snap ring and into the spar and not through a tip cap dovetail slot and projection structure.

  17. Recirculation in multiple wave conversions

    SciTech Connect (OSTI)

    Kaufman, A. N.; Brizard, A.J.; Kaufman, A.N.; Tracy, E.R.

    2008-07-30

    A one-dimensional multiple wave-conversion model is constructed that allows energy recirculation in ray phase space. Using a modular eikonal approach, the connection coefficients for this model are calculated by ray phase-space methods. Analytical results (confirmed numerically) show that all connection coefficients exhibit interference effects that depend on an interference phase, calculated from the coupling constants and the area enclosed by the intersecting rays. This conceptual model, which focuses on the topology of intersecting rays in phase space, is used to investigate how mode conversion between primary and secondary waves is modified by the presence of a tertiary wave.

  18. Multiple channel programmable coincidence counter

    DOE Patents [OSTI]

    Arnone, Gaetano J.

    1990-01-01

    A programmable digital coincidence counter having multiple channels and featuring minimal dead time. Neutron detectors supply electrical pulses to a synchronizing circuit which in turn inputs derandomized pulses to an adding circuit. A random access memory circuit connected as a programmable length shift register receives and shifts the sum of the pulses, and outputs to a serializer. A counter is input by the adding circuit and downcounted by the seralizer, one pulse at a time. The decoded contents of the counter after each decrement is output to scalers.

  19. Multiple protocol fluorometer and method

    DOE Patents [OSTI]

    Kolber, Zbigniew S. (Shoreham, NY); Falkowski, Paul G. (Stony Brook, NY)

    2000-09-19

    A multiple protocol fluorometer measures photosynthetic parameters of phytoplankton and higher plants using actively stimulated fluorescence protocols. The measured parameters include spectrally-resolved functional and optical absorption cross sections of PSII, extent of energy transfer between reaction centers of PSII, F.sub.0 (minimal), F.sub.m (maximal) and F.sub.v (variable) components of PSII fluorescence, photochemical and non-photochemical quenching, size of the plastoquinone (PQ) pool, and the kinetics of electron transport between Q.sub.a and PQ pool and between PQ pool and PSI. The multiple protocol fluorometer, in one embodiment, is equipped with an excitation source having a controlled spectral output range between 420 nm and 555 nm and capable of generating flashlets having a duration of 0.125-32 .mu.s, an interval between 0.5 .mu.s and 2 seconds, and peak optical power of up to 2 W/cm.sup.2. The excitation source is also capable of generating, simultaneous with the flashlets, a controlled continuous, background illumination.

  20. Multiple channel data acquisition system

    DOE Patents [OSTI]

    Crawley, H. Bert (Ames, IA); Rosenberg, Eli I. (Ames, IA); Meyer, W. Thomas (Ames, IA); Gorbics, Mark S. (Ames, IA); Thomas, William D. (Boone, IA); McKay, Roy L. (Ames, IA); Homer, Jr., John F. (Ames, IA)

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler.

  1. Multiple channel data acquisition system

    DOE Patents [OSTI]

    Crawley, H.B.; Rosenberg, E.I.; Meyer, W.T.; Gorbics, M.S.; Thomas, W.D.; McKay, R.L.; Homer, J.F. Jr.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler. 25 figs.

  2. Multiple soil nutrient competition between plants, microbes,...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Multiple soil nutrient competition between plants, microbes, and mineral surfaces: model development, parameterization, and example applications in several...

  3. Detection of electromagnetic radiation using micromechanical multiple

    Office of Scientific and Technical Information (OSTI)

    quantum wells structures (Patent) | SciTech Connect Patent: Detection of electromagnetic radiation using micromechanical multiple quantum wells structures Citation Details In-Document Search Title: Detection of electromagnetic radiation using micromechanical multiple quantum wells structures An apparatus and method for detecting electromagnetic radiation employs a deflectable micromechanical apparatus incorporating multiple quantum wells structures. When photons strike the quantum-well

  4. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    SciTech Connect (OSTI)

    Voegele, Michael D. [Consultant, Nye County Nuclear Waste Repository Project Office, 7404 Oak Grove Ave, Las Vegas, NV 89117 (United States)] [Consultant, Nye County Nuclear Waste Repository Project Office, 7404 Oak Grove Ave, Las Vegas, NV 89117 (United States); Vieth, Donald [1154 Chelttenham Place, Maineville, OH 45039 (United States)] [1154 Chelttenham Place, Maineville, OH 45039 (United States)

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

  5. Draft Letter on the Final Report of the Commission to review the Effectiveness of the National Energy Laboratories

    Broader source: Energy.gov [DOE]

    This draft letter of the National Laboratory Task Force transmits the comments of its National Laboratories Task Force on thefinal report of the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL).

  6. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. Two (2) 175 Ton (350 Tons total) Chiller Geothermal Heat Pumps for recently commissioned LEED Platinum Building

    Broader source: Energy.gov [DOE]

    This project will operate; collect data; and market the energy savings and capital costs of a recently commissioned chiller geothermal heat pump project to promote the wide-spread adoption of this mature technology.

  8. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  9. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  10. Memorandum of Understanding Between the U.S Department of Energy and the Federal Energy Regulatory Commission: December 2009

    Broader source: Energy.gov [DOE]

    The U.S department of energy and the Federal Energy Regulatory Commission enter into this Memorandum of Understanding to set out their respective coordinated roles under existing authorities as...

  11. COMMISSIONING RESULTS OF SLOW EXTRACTION OF HEAVY IONS FROM THE AGS BOOSTER.

    SciTech Connect (OSTI)

    Brown, K A; Bellavia, S; Binello, S; Brelsford, B; Dumont, D; Eng, W; Gardner, G; Gassner, D; Glenn, J W; Hammons, L; Hock, J; Hoff, L; Hutchinson, E; Jamilkowski, J; Kling, N; Kotlyar, Y; Krishock, A; Lockey, R; Mapes, M; Marneris, I; Marr, G; McNerney, A; Meyer, A; Morris, J; Naylor, C; Nemesure, S; Phillips, D; Rusek, A; Ryan, J; Shrey, T; Snydstrup, L; Tsoupas, N; Vankuik, B; Zahariou-Cohen, K

    2003-05-12

    Brookhaven's AGS Booster has been modified to deliver slow extracted beam to a new beam line, the NASA Space Radiation Laboratory (NSRL). This facility was constructed in collaboration with NASA for the purpose of performing radiation effect studies for the NASA space program. The design of the resonant extraction system has been described in [1]. A more detailed description, which includes predictions of the slow extracted beam time structure has been described in [2]. In this report we will present results of the system commissioning and performance.

  12. Development and Commissioning of a Small/Mid-Size Wind Turbine Test Facility: Preprint

    SciTech Connect (OSTI)

    Valyou, D.; Arsenault, T.; Janoyan, K.; Marzocca, P.; Post, N.; Grappasonni, G.; Arras, M.; Coppotelli, G.; Cardenas, D.; Elizalde, H.; Probst, O.

    2015-01-01

    This paper describes the development and commissioning tests of the new Clarkson University/Center for Evaluation of Clean Energy Technology Blade Test Facility. The facility is a result of the collaboration between the New York State Energy Research and Development Authority and Intertek, and is supported by national and international partners. This paper discusses important aspects associated with blade testing and includes results associated with modal, static, and fatigue testing performed on the Sandia National Laboratories' Blade Systems Design Studies blade. An overview of the test capabilities of the Blade Test Facility are also provided.

  13. Recovery Act: Training Curriculum Development for Building Equipment Technicians, Operators, and Commissioning Agents/Auditors

    SciTech Connect (OSTI)

    Jacobsen, Joseph; Yu, David

    2012-08-04

    This US DOE funded project produced ten advanced energy engineering technology courses where students learn about the latest technologies and practices in the energy industry to reduce energy use in residential, commercial and industrial settings, accounting for over 50% of the worlds energy use. A geothermal and a solar thermal system were installed and commissioned as part of this project, an MATCs cost share. An innovative intelligent lighting lab was installed, complete with course content as well as innovative academic pathway construction, laddering students from the 2-year technical college to the 4-year engineering school.

  14. Commissioning Results of the 2nd 3.5 Cell SRF Gun for ELBE

    SciTech Connect (OSTI)

    Arnold, A; Freitag, M; Murcek, Petr; Teichert, Jochen; Vennekate, H; Xiang, R; Ciovati, Gianluigi; Kneisel, Peter K.; Turlington, Larry D,

    2014-12-01

    As in 2007 the first 3.5 cell superconducting radio frequency (SRF) gun was taken into operation, it turned out that the specified performance has not been achieved. However, to demonstrate the full potential of this new type of electron source, a second and slightly modified SRF gun II was built in collaboration with Thomas Jefferson National Accelerator Facility (TJNAF). We will report on commissioning and first results of the new gun, which includes in particular the characterization of the most important RF properties as well as their comparison with previous vertical test results.

  15. Remarks by Federal Blue Ribbon Commission J. David Jameson Atlanta, GA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Blue Ribbon Commission J. David Jameson Atlanta, GA October 18, 2011 Good Morning. I am David Jameson. I am President and CEO of the Greater Aiken, South Carolina, Chamber of Commerce. I am here today in my capacity as current Chairman of the SRS Community Reuse Organization. The SRSCRO is a non-profit regional group supporting economic diversification and job creation in a five-county in Georgia and South Carolina near the Department of Energy's Savannah River Site. We are unique among

  16. Speakers: Stephen Harvey, EIA Dan M. Berkovitz, U.S. Commodity Futures Trading Commission

    Gasoline and Diesel Fuel Update (EIA)

    6: "Regulating Energy Commodities" Speakers: Stephen Harvey, EIA Dan M. Berkovitz, U.S. Commodity Futures Trading Commission Sean Cota, Cota & Cota R. Skip Horvath, Natural Gas Supply Association Deanna L. Newcomb, McDermott Will & Emery LLP [Note: Recorders did not pick up introduction of panel (see biographies for details on the panelists) or introduction of session.] Steve Harvey: Why don't we start kind taking our seats and give it just a...well, no looks like we're pretty

  17. The United States Nuclear Regulatory Commission and the United States Department Of Energy Public Meeting

    Office of Environmental Management (EM)

    2 The UNITED STATES 3 NUCLEAR REGULATORY COMMISSION and 4 the UNITED STATES 5 DEPARTMENT OF ENERGY 6 7 PUBLIC MEETING 8 9 DISCUSSION OF THE IMPLEMENTATION OF SECTION 3116 OF 10 THE NATIONAL DEFENSE AUTHORIZATION ACT 11 12 Commencing at 9:10 a.m., November 16, 2006 13 at the L'Enfant Plaza Hotel 14 480 L'Enfant Plaza, SW 15 Washington DC 20024 16 17 Public meeting organized by: 18 Advanced Technologies and Laboratories International, Inc. 19 20010 Century Boulevard, Suite 500 20 Germantown,

  18. Researcher Supported by Atomic Energy Commission and U.S. Department of

    Office of Scientific and Technical Information (OSTI)

    Energy is Co-Winner Of 2008 Nobel Prize in Physics October 7, 2008 Researcher Supported by Atomic Energy Commission and U.S. Department of Energy is Co-Winner Of 2008 Nobel Prize in Physics WASHINGTON, D.C.-U.S. Department of Energy (DOE) Under Secretary for Science Raymond L. Orbach today congratulated Yoichiro Nambu of the United States and Makoto Kobayashi and Toshihide Maskawa of Japan for co-winning the 2008 Nobel Prize in Physics for their theoretical insights that provide a deeper

  19. Installation and commissioning of the new Fermi National Accelerator Laboratory H- Magnetron

    SciTech Connect (OSTI)

    Bollinger, D. S.

    2014-02-15

    The Fermi National Accelerator Laboratory (FNAL) 40 year old Cockcroft-Walton 750 keV injectors with slit aperture magnetron ion sources have been replaced with a circular aperture magnetron, Low Energy Beam Transport, Radio Frequency Quadrupole Accelerator, and Medium Energy Beam Transport, as part of the FNAL Proton Improvement Plan. The injector design is based on a similar system at Brookhaven National Laboratory. The installation, commissioning efforts, and source operations to date will be covered in this paper along with plans for additional changes to the original design to improve reliability by reducing extractor spark rates and arc current duty factor.

  20. Commissioning of the 123 MeV injector for 12 GeV CEBAF

    SciTech Connect (OSTI)

    Wang, Yan; Hofler, Alicia S.; Kazimi, Reza

    2015-09-01

    The upgrade of CEBAF to 12GeV included modifications to the injector portion of the accelerator. These changes included the doubling of the injection energy and relocation of the final transport elements to accommodate changes in the CEBAF recirculation arcs. This paper will describe the design changes and the modelling of the new 12GeV CEBAF injector. Stray magnetic fields have been a known issue for 6 GeV CEBAF injector, the results of modelling the new 12GeV injector and the resulting changes implemented to mitigate this issue are describe in this paper. The results of beam commissioning of the injector are also presented.

  1. Beam commissioning of the RFQ for the RHIC-EBIS project

    SciTech Connect (OSTI)

    Okamura,M.; Alessi, J.; Beebe, E.; Lodestro, V.; Pikin, A.; Ritter, J.; Tamura, J.; Kanesue, T.; Schempp, A.; Schmidt, J.; Vossberg, M.

    2009-05-04

    Beam commissioning of a new 4 rod RFQ has started at Brookhaven National Laboratory (BNL). The RFQ will accelerate intense heavy ion beams provided by an Electron Beam ion Source (EBIS) up to 300 keV/u. The RFQ will accelerate a range of Q/M from 1 to 1/6, and the accelerated beam will be finally delivered to the Relativistic Heavy Ion Collider (RHIC) and NASA Space Radiation Laboratory (NSRL). The first beam was successfully accelerated and the bunch structures of He{sup +} and Cu{sup 10+} beams were measured. The further beam tests are in progress.

  2. Specification of Selected Performance Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2006-10-06

    Pacific Northwest National Laboratory (PNNL) is assisting the U.S. Department of Energy (DOE) Distributed Energy (DE) Program by developing advanced control algorithms that would lead to development of tools to enhance performance and reliability, and reduce emissions of distributed energy technologies, including combined heat and power technologies. This report documents phase 2 of the program, providing a detailed functional specification for algorithms for performance monitoring and commissioning verification, scheduled for development in FY 2006. The report identifies the systems for which algorithms will be developed, the specific functions of each algorithm, metrics which the algorithms will output, and inputs required by each algorithm.

  3. U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

    Office of Legacy Management (LM)

    -., * : . ; * c i. :i; $i 4 5 ' I jr 1 ly i *- 1 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 078-154-A - Part1 of 2 Subject: Radioactive Material in Norton, Massachusetts Uncontrolled ' :-- . . . _ > Location, Investigation at: Norton and Attleboro, Massachusetts Investigation conducted: November 14, 28-30; December 1, 7, 8, 21, 1978; January 9-12, 1978 Investigators: ?-9,7G Phys'ical Security-Inspector I dati sibntd rl,puet ryyl Ilty Inspector

  4. UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL LlCENSE

    Office of Legacy Management (LM)

    ' ,' ' .:,: ' ,' ,,.. : .-: .: .A,.. :. .:,: ' .' :l:. ,:.:,. ,. ."i i..' ./. ' . : :, *:..: ,.a~ :.. ,::;: ;#j ,,. .,.' ' : 8:;) ,,> ,' UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL LlCENSE pp.o-o\ 43 Licensee 1. Name spm%r ch+ti (hlqay 3. 2. Address i%si&t Building Kansas cay 5, ifissouri ~..--. 3. License No. .m4-329 I 4. Exp/rotion Date Sepikmber 30, I.962 -6. Special Nuclear:Material ~~~~SnrichedtoS~ I under this license ia the a-235 i.soto~p. one thoti (1ooo)

  5. UNITED STATES NUCLEAR REGUtiTORY COMMISSION REGION I C31 PARK AVENUE

    Office of Legacy Management (LM)

    REGUtiTORY COMMISSION REGION I C31 PARK AVENUE KlNt OF PRUSSIC. PENNSYLVANIA 1P4D6 z,: P -. : _ &J L . . : ; .; 3 Do:ket No. 40-2286 Westinqhouse Electric Company Lamp D1vis-i ons KTm : Mr. 8. Rourke Operations Manager 1 &stinghouse Plaza Bioomfield, New Jersey 07003 Gentlemen: Subject: Inspection 8E01 . ' 2 7 -7 CE r:.. gj a h = 3 Y -;3 -a. D- r0 kc - . I g. r-- I- ; 3.. rr z -. --V, --..I . .e. ! ,: ." 1; .,' < -- 'I c This refers February il to the inspection conducted by Mr.

  6. Multiple-stage integrating accelerometer

    DOE Patents [OSTI]

    Devaney, Howard F. (Cedar Crest, NM)

    1986-01-01

    An accelerometer assembly is provided for use in activating a switch in response to multiple acceleration pulses in series. The accelerometer includes a housing forming a chamber. An inertial mass or piston is slidably disposed in the chamber and spring biased toward a first or reset position. A damping system is also provided to damp piston movement in response to first and subsequent acceleration pulses. Additionally, a cam, including a Z-shaped slot, and cooperating follower pin slidably received therein are mounted to the piston and the housing. The middle or cross-over leg of the Z-shaped slot cooperates with the follower pin to block or limit piston movement and prevent switch activation in response to a lone acceleration pulse. The switch of the assembly is only activated after two or more separate acceleration pulses are sensed and the piston reaches the end of the chamber opposite the reset position.

  7. Multiple-stage integrating accelerometer

    DOE Patents [OSTI]

    Devaney, H.F.

    1984-06-27

    An accelerometer assembly is provided for use in activating a switch in response to multiple acceleration pulses in series. The accelerometer includes a housing forming a chamber. An inertial mass or piston is slidably disposed in the chamber and spring biased toward a first or reset position. A damping system is also provided to damp piston movement in response to first and subsequent acceleration pulses. Additionally, a cam, including a Z-shaped slot, and cooperating follower pin slidably received therein are mounted to the piston and the housing. The middle or cross-over leg of the Z-shaped slot cooperates with the follower pin to block or limit piston movement and prevent switch activation in response to a lone acceleration pulse. The switch of the assembly is only activated after two or more separate acceleration pulses are sensed and the piston reaches the end of the chamber opposite the reset position.

  8. WE-F-16A-01: Commissioning and Clinical Use of PC-ISO for Customized, 3D Printed, Gynecological Brachytherapy Applicators

    SciTech Connect (OSTI)

    Cunha, J; Sethi, R; Mellis, K; Siauw, T; Sudhyadhom, A; Hsu, I; Pouliot, J

    2014-06-15

    Purpose: (1) Evaluate the safety and radiation attenuation properties of PCISO, a bio-compatible, sterilizable 3D printing material by Stratasys, (2) establish a method for commissioning customized multi- and single-use 3D printed applicators, (3) report on use of customized vaginal cylinders used to treat a series of serous endometrial cancer patient. Methods: A custom film dosimetry apparatus was designed to hold a Gafchromic radio film segment between two blocks of PC-ISO and 3D-printed using a Fortus 400mc (StrataSys). A dose plan was computed using 13 dwell positions at 2.5 mm spacing and normalized to 1500 cGy at 1 cm. Film exposure was compared to control tests in only air and only water. The average Hounsfield Unit (HU) was computed and used to verify water equivalency. For the clinical use cases, the physician specifies the dimensions and geometry of a custom applicator from which a CAD model is designed and printed. Results: The doses measured from the PC-ISO Gafchromic film test were within 1% of the dose measured in only water between 1cm and 6cm from the channel. Doses increased 74% measured in only air. HU range was 1143. The applicators were sterilized using the Sterrad system multiple times without damage. As of submission 3 unique cylinders have been designed, printed, and used in the clinic. A standardizable workflow for commissioning custom 3D printed applicators was codified and will be reported. Conclusions: Quality assurance (QA) evaluation of the PC-ISO 3D-printing material showed that PC-ISO is a suitable material for a gynecological brachytherapy vaginal cylinder in a clinical setting. With the material commissioning completed, if the physician determines that a better treatment would Result, a customized design is fabricated with limited additional QA necessary. Although this study was specific to PC-ISO, the same setup can be used to evaluate other 3D-printing materials.

  9. COMMISSIONING OF THE DIGITAL TRANSVERSE BUNCH-BY-BUNCH FEEDBACK SYSTEM FOR THE TLS.

    SciTech Connect (OSTI)

    HU, K.H.; KUO, C.H.; CHOU, P.J.; LEE, D.; HSU, S.Y.; CHEN, J.; WANG, C.J.; HSU, K.T.; KOBAYASHI, K.; NAKAMURA, T.; CHAO, A.W.; WENG, W.T.

    2006-06-26

    Multi-bunch instabilities degrade beam quality through increased beam emittance, energy spread and even beam loss. Feedback systems are used to suppress multi-bunch instabilities associated with the resistive wall of the beam ducts, cavity-like structures, and trapped ions. A new digital transverse bunch-by-bunch feedback system has recently been commissioned at the Taiwan Light Source, and has replaced the previous analog system. The new system has the advantages that it enlarges the tune acceptance and improves damping for transverse instability at high currents, such that top-up operation is achieved. After a coupled-bunch transverse instability was suppressed, more than 350 mA was successfully stored during preliminary commissioning. In this new system, a single feedback loop simultaneously suppresses both horizontal and vertical multi-bunch instabilities. Investigating the characteristics of the feedback loop and further improving the system performances are the next short-term goals. The feedback system employs the latest generation of field-programmable gate array (FPGA) processor to process bunch signals. Memory has been installed to capture up to 250 msec of bunch oscillation signal, considering system diagnostics suitable to support various beam physics studies.

  10. Training and Certification Program for Certified Energy Auditors (CEA) and Certified Building Commissioning Professionals (CBCP)

    SciTech Connect (OSTI)

    Kent, Bill

    2012-08-24

    The Association of Energy Engineers (AEE) has offered energy efficiency training and certification programs for over 30 years. During that time AEE has certified more than 22,000 professionals. All of our certification programs are the result of extensive industry research and program development and oversight by certification boards. For this project award, AEE proposed to work with the Department of Energy to utilize and extend existing industry recognized Certified Energy Auditor (CEA) and Certified Building Commissioning Professional (CBCP) programs under this Training Program Development Announcement. These expanded training programs will have significant impact in training professionals for building commissioning and energy auditing to achieve the goal of bringing existing buildings up to their optimal energy performance potential and ensuring that new buildings maintain their expected optimal level of performance. The goals and objectives of the training development project were achieved with the development of new training programs that are now being offered as self-sustaining commercial training and certification programs. These new programs are training and certifying professionals who are accomplishing the goal of increasing building energy performance in both existing and new buildings.

  11. Commissioning results of Nb3Sn cavity vapor diffusion deposition system at Jlab

    SciTech Connect (OSTI)

    Eremeev, Grigory; Clemens, William A.; Macha, Kurt M.; Park, HyeKyoung; Williams, R.

    2015-09-01

    Nb3Sn as a BCS superconductor with a superconducting critical temperature higher than that of niobium offers potential benefit for SRF cavities via a lower-than-niobium surface resistance at the same temperature and frequency. A Nb3Sn vapor diffusion deposition system designed for coating of 1.5 and 1.3 GHz single-cell cavities was built and commissioned at JLab. As the part of the commissioning, RF performance at 2.0 K of a single-cell 1.5 GHz CEBAF-shaped cavity was measured before and after coating in the system. Before Nb3Sn coating the cavity had a Q0 of about 10E10 and was limited by the high field Q-slope at Eacc about 27 MV/m. Coated cavity exhibited the superconducting transition at about 17.9 K. The low-field quality factor was about 5 10E9 at 4.3 K and 7 10E9 at 2.0 K decreasing with field to about 1 10E9 at Eacc about 8 MV/m at both temperatures. The highest field was limited by the available RF power.

  12. Commissioning of the LHC Low Level RF System Remote Configuration Tools

    SciTech Connect (OSTI)

    Van Winkle, Daniel; Fox, John; Mastorides, Themis; Rivetta, Claudio; Baudrenghien, Philippe; Butterworth, Andrew; Molendijk, John; /CERN

    2010-08-26

    The LHC Low Level RF system (LLRF) is a complex multi-loop system used to regulate the superconductive cavity gap voltage as well as to reduce the impedance presented by RF stations to the beam. The RF system can have a profound impact on the stability of the beam; a mis-configured RF system has the potential of causing longitudinal instabilities, beam diffusion and beam loss. To configure the RF station for operation, a set of parameters in the LLRF multi-loop system have to be defined. Initial system commissioning as well as ongoing operation requires a consistent method of computer based remote measurement and model-based design of each RF station feedback system. This paper describes the suite of Matlab tools used for configuring the LHC RF system during the start up in Nov2009-Feb2010. We present a brief overview of the tool, examples of commissioning results, and basics of the model-based design algorithms. This work complements our previous presentation, where the algorithms and methodology followed in the tools were described.

  13. A Semi-automated Commissioning Tool for VAV Air Handling Units:Functional Test Analyzer

    SciTech Connect (OSTI)

    Haves, Philip; Kim, Moosung; Najafi, Massieh; Xu, Peng

    2007-01-01

    A software tool that automates the analysis of functional tests for air-handling units is described. The tool compares the performance observed during manual tests with the performance predicted by simple models of the components under test that are configured using design and of information catalog data. Significant differences between observed and expected performance indicate the presence faults. Fault diagnosis is performed by analyzing the variation of these differences with operating points using expert rules and fuzzy inferencing. The tool has a convenient user interface to facilitate manual entry of measurements made during a test. A graphical display compares the measured and expected performance, highlighting significant differences that indicate the presence of faults. The tool is designed to be used by commissioning providers conducting functional tests as part of either new building commissioning or retrocommissioning as well as by building owners and operators conducting routine tests to check the performance of their HVAC systems. This paper describes the input data requirements of the tool, the software structure, and the graphical interface and summarizes the development and testing process used.

  14. Multidisciplinary framework for human reliability analysis with an application to errors of commission and dependencies

    SciTech Connect (OSTI)

    Barriere, M.T.; Luckas, W.J.; Wreathall, J.; Cooper, S.E.; Bley, D.C.; Ramey-Smith, A.

    1995-08-01

    Since the early 1970s, human reliability analysis (HRA) has been considered to be an integral part of probabilistic risk assessments (PRAs). Nuclear power plant (NPP) events, from Three Mile Island through the mid-1980s, showed the importance of human performance to NPP risk. Recent events demonstrate that human performance continues to be a dominant source of risk. In light of these observations, the current limitations of existing HRA approaches become apparent when the role of humans is examined explicitly in the context of real NPP events. The development of new or improved HRA methodologies to more realistically represent human performance is recognized by the Nuclear Regulatory Commission (NRC) as a necessary means to increase the utility of PRAS. To accomplish this objective, an Improved HRA Project, sponsored by the NRC`s Office of Nuclear Regulatory Research (RES), was initiated in late February, 1992, at Brookhaven National Laboratory (BNL) to develop an improved method for HRA that more realistically assesses the human contribution to plant risk and can be fully integrated with PRA. This report describes the research efforts including the development of a multidisciplinary HRA framework, the characterization and representation of errors of commission, and an approach for addressing human dependencies. The implications of the research and necessary requirements for further development also are discussed.

  15. V-224: Google Chrome Multiple Vulnerabilities | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Google Chrome Multiple Vulnerabilities V-224: Google Chrome Multiple Vulnerabilities August 22, 2013 - 1:05am Addthis PROBLEM: Multiple vulnerabilities have been reported in...

  16. V-121: Google Chrome Multiple Vulnerabilities | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Google Chrome Multiple Vulnerabilities V-121: Google Chrome Multiple Vulnerabilities March 28, 2013 - 12:29am Addthis PROBLEM: Google Chrome Multiple Vulnerabilities PLATFORM:...

  17. V-207: Wireshark Multiple Denial of Service Vulnerabilities ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Wireshark Multiple Denial of Service Vulnerabilities V-207: Wireshark Multiple Denial of Service Vulnerabilities July 31, 2013 - 1:59am Addthis PROBLEM: Multiple vulnerabilities...

  18. Using Whole-Building Electric Load Data in Continuous or Retro-Commissioning

    SciTech Connect (OSTI)

    Price, Phillip N.; Mathieu, Johanna L.; Kiliccote, Sila; Piette, Mary Ann

    2011-07-01

    Whole-building electric load data can often reveal problems with building equipment or operations. In this paper, we present methods for analyzing 15-minute-interval electric load data. These methods allow building operators, energy managers, and commissioning agents to better understand a building's electricity consumption over time and to compare it to other buildings, helping them to 'ask the right questions' to discover opportunities for electricity waste elimination, energy efficiency, peak load management, and demand response. For example: Does the building use too much energy at night, or on hot days, or in the early evening? Knowing the answer to questions like these can help with retro-commissioning or continuous commissioning. The methods discussed here can also be used to assess how building energy performance varies with time. Comparing electric load before and after fixing equipment or changing operations can help verify that the fixes have the intended effect on energy consumption. Analysis methods discussed in this paper include: ways to graphically represent electric load data; the definition of various parameters that characterize facility electricity loads; and a regression-based electricity load model that accounts for both time of week and outdoor air temperature. The methods are illustrated by applying them to data from commercial buildings. We demonstrate the ability to recognize changes in building operation, and to quantify changes in energy performance. Some key findings are: 1) Plotting time series electric load data is useful for understanding electricity consumption patterns and changes to those patterns, but results may be misleading if data from different time intervals are not weather-normalized. 2) Parameter plots can highlight key features of electric load data and may be easier to interpret than plots of time series data themselves. 3) A time-of-week indicator variable (as compared to time-of-day and day-of-week indicator variables) improves the accuracy of regression models of electric load. 4) A piecewise linear and continuous outdoor air temperature dependence can be derived without the use of a change-point model (which would add complexity to the modeling algorithm) or assumptions about when structural changes occur (which could introduce inaccuracy). 5) A model that includes time-of-week and temperature dependence can be used for weather normalization and can determine whether the building is unusually temperature-sensitive, which can indicate problems with HVAC operation.

  19. SU-E-T-343: Valencia Applicator Commissioning Using a Micro-Chamber Array

    SciTech Connect (OSTI)

    Carmona-Meseguer, V; Palomo-Llinares, R; Candela-Juan, C; Gimeno-Olmos, J; Lliso-Valverde, F; Garcia-Martinez, T; Richart-Sancho, J; Granero, D; Ballester, F; Perez-Calatayud, J

    2014-06-01

    Purpose: In the commissioning and QA of surface isotope-based applicators, source-indexer distance (SID) has a great influence in the flatness, symmetry and output. To these purposes, methods described in the literature are the use of a special insert at the entrance of dwell chamber or radiochromic films. Here we present the experience with a micro-chamber array to perform the commissioning and QA of Valencia applicators. Methods: Valencia applicators have been used, the classic and the new extra-shielded version. A micro-chamber array has been employed, 1000 SRS (PTW), with 977 liquid filled, 2.32.30.5 mm{sup 3} sized ion chambers covering 1111 cm{sup 2}, which spacing is 2.5 mm in the central 5.55.5 cm{sup 2}, dedicated mainly in principle, in conjunction with Octavius 4D (PTW), to IMRT, VMAT, SBRT verifications. Verisoft software that allows for 3D and planar analysis has been used to evaluate the results. Applicators were located on the surface of the array. To verify the SID, measurements corresponding to the reference value, SID 1 mm and SID 2 mm were acquired (integration time was fixed in order to discard the influence of the source entrance/exit). Once SID was determined, standard protocol treatments corresponding to 3 Gy and 7 Gy were acquired in order to establish typical patient dose distribution. Results: The method is fast and sensitive. The SID obtained was 1321 mm which is the nominal value included in the applicator manual. For example at 1319 mm an asymmetry of 8% with respect to the central value was measured, along with a central deviation of ?4% referred to 1321 mm. Conclusion: A practical method for the commissioning and QA of Valencia applicators has been described. It has been shown that it is an efficient and accurate tool for these purposes as well as for the verification of the absolute output constancy.

  20. Multi-institutional dosimetric and geometric commissioning of image-guided small animal irradiators

    SciTech Connect (OSTI)

    Lindsay, P. E.; Granton, P. V.; Hoof, S. van; Hermans, J.; Gasparini, A.; Jelveh, S.; Clarkson, R.; Department of Radiation Oncology, University of Toronto, Toronto, Ontario M5S 1A1; Mid-South Radiation Physics, Inc., 1801 South 54th Street, Paragould, Arkansas 72450 ; Kaas, J.; Wittkamper, F.; Sonke, J.-J.; Verhaegen, F.; Medical Physics Unit, Department of Oncology, McGill University, Montreal, Qubec H3G 1A4 ; Jaffray, D. A.; Department of Radiation Oncology, University of Toronto, Toronto, Ontario M5S 1A1; The TECHNA Institute for the Advancement of Technology for Health, Toronto, Ontario M5G 1P5

    2014-03-15

    Purpose: To compare the dosimetric and geometric properties of a commercial x-ray based image-guided small animal irradiation system, installed at three institutions and to establish a complete and broadly accessible commissioning procedure. Methods: The system consists of a 225 kVp x-ray tube with fixed field size collimators ranging from 1 to 44 mm equivalent diameter. The x-ray tube is mounted opposite a flat-panel imaging detector, on a C-arm gantry with 360 coplanar rotation. Each institution performed a full commissioning of their system, including half-value layer, absolute dosimetry, relative dosimetry (profiles, percent depth dose, and relative output factors), and characterization of the system geometry and mechanical flex of the x-ray tube and detector. Dosimetric measurements were made using Farmer-type ionization chambers, small volume air and liquid ionization chambers, and radiochromic film. The results between the three institutions were compared. Results: At 225kVp, with 0.3 mm Cu added filtration, the first half value layer ranged from 0.9 to 1.0 mm Cu. The dose-rate in-air for a 40 40 mm{sup 2} field size, at a source-to-axis distance of 30 cm, ranged from 3.5 to 3.9 Gy/min between the three institutions. For field sizes between 2.5 mm diameter and 40 40 mm{sup 2}, the differences between percent depth dose curves up to depths of 3.5 cm were between 1% and 4% on average, with the maximum difference being 7%. The profiles agreed very well for fields >5 mm diameter. The relative output factors differed by up to 6% for fields larger than 10 mm diameter, but differed by up to 49% for fields ?5 mm diameter. The mechanical characteristics of the system (source-to-axis and source-to-detector distances) were consistent between all three institutions. There were substantial differences in the flex of each system. Conclusions: With the exception of the half-value layer, and mechanical properties, there were significant differences between the dosimetric and geometric properties of the three systems. This underscores the need for careful commissioning of each individual system for use in radiobiological experiments.