National Library of Energy BETA

Sample records for bbnp preliminary process

  1. Preliminary Impact Evaluation BBNP

    Broader source: Energy.gov [DOE]

    Preliminary Impact Evaluation of the U.S. Department of Energy's Better Buildings Neighborhood Program, 2013.

  2. Preliminary Process and Market Evaluation: Better Buildings Neighborho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with the Lawrence Berkeley National Laboratory to conduct a comprehensive program assessment of BBNP. Preliminary Process and Market Evaluation: BBNP (2.64 MB) More Documents & ...

  3. Preliminary Process and Market Evaluation

    Broader source: Energy.gov [DOE]

    Preliminary Process and Market Evaluation, from a team of evaluators, independent of the BBNP program, with whom DOE contracted to assess the performance of BBNP and identify lessons learned.

  4. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document presents the preliminary process and market evaluation of the U.S. Department of Energy’s (DOE) Better Buildings Neighborhood Program (BBNP). The document was prepared in partial fulfillment of a contract with the Lawrence Berkeley National Laboratory to conduct a comprehensive program assessment of BBNP.

  5. Presentation: Better Buildings Neighborhood Program (BBNP) Summary of Reported Data

    Broader source: Energy.gov [DOE]

    Presentation: Better Buildings Neighborhood Program (BBNP) Summary of Reported Data, from the U.S. Department of Energy, Better Buildings Neighborhood Program.

  6. US DOE EECBG BBNP REPORT

    SciTech Connect (OSTI)

    Driscoll, Brian; Conkey, Todd; Edgar, George; Fox, Lisa; Kahl, Shannon; Lightbourn, Steve; Moubry, Cindy; Nettleton, Greg; Plunkett, Mike; Smith, Paul; Thibert-Blank, Jackie; Wollin, Amanda

    2013-12-31

    The Wisconsin Energy Efficiency (WE2) Program delivered residential and commercial programming for the City of Milwaukee (Me2) and the City of Madison (Green Madison) as well as commercial only programming for the City of Racine (Re2). Direct incentives and loan products for homeowners and business owners were offered, with the goal to achieve at least 15 percent in energy savings. At the time of this report, there were more than 2,000 residential energy efficiency upgrades completed and more than 300 commercial energy efficiency upgrades completed. The average energy savings for the WE2 Program’s portfolio of residential and commercial projects exceeds 15 percent and is closer to 30 percent energy savings. Combined energy savings of both residential and commercial activities were: 20,937,369 kWh; 1,018,907 Therms; and 31,655 gallons of heating oil; or at least 332,788 MMBTUs; or at least $3,444,828 in estimated energy costs saved. Conservative economic impact estimates include the employment of more than 100 residential auditors and contractors, more than 90 commercial contractors, and more than $41 million in total project costs expended in the targeted communities. WECC, along with the Partner Cities, attempted to create energy efficiency programming that helped to increase economic activity, increase workforce opportunities, and save energy in three of the largest communities in Wisconsin. Homeowners were assisted through the residential process by Energy Advocates, consultants, and contractors. Business owners were assisted through the commercial process by Program Advocates, contractors and trade allies. Contractors in both the residential and commercial programs were educated and trained by the many offerings provided by WECC. Together, all parties involved made the WE2 Program successful. The most prominent innovative approaches employed in the Me2 and Green Madison programs for residential retrofits were: use of a loan loss reserve approach to improve

  7. Preliminary hazards analysis -- vitrification process

    SciTech Connect (OSTI)

    Coordes, D.; Ruggieri, M.; Russell, J.; TenBrook, W.; Yimbo, P.

    1994-06-01

    This paper presents a Preliminary Hazards Analysis (PHA) for mixed waste vitrification by joule heating. The purpose of performing a PHA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PHA is then followed by a Preliminary Safety Analysis Report (PSAR) performed during Title 1 and 2 design. The PSAR then leads to performance of the Final Safety Analysis Report performed during the facility`s construction and testing. It should be completed before routine operation of the facility commences. This PHA addresses the first four chapters of the safety analysis process, in accordance with the requirements of DOE Safety Guidelines in SG 830.110. The hazards associated with vitrification processes are evaluated using standard safety analysis methods which include: identification of credible potential hazardous energy sources; identification of preventative features of the facility or system; identification of mitigative features; and analyses of credible hazards. Maximal facility inventories of radioactive and hazardous materials are postulated to evaluate worst case accident consequences. These inventories were based on DOE-STD-1027-92 guidance and the surrogate waste streams defined by Mayberry, et al. Radiological assessments indicate that a facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous materials assessment indicates that a Mixed Waste Vitrification facility will be a Low Hazard facility having minimal impacts to offsite personnel and the environment.

  8. Preliminary Notice of Violation

    Office of Environmental Management (EM)

    Program, Final report | Department of Energy Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, Final report Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, Final report This document presents the findings from the preliminary impact evaluation of the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program (BBNP). The report was prepared in partial fulfillment of a contract with the Lawrence Berkeley National

  9. Final Report Appendices: Preliminary Process and Market Evaluation: Better

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Neighborhood Program | Department of Energy Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012. Final Report Appendices (2.29 MB) More Documents & Publications Preliminary Process and Market

  10. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Report: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012.

  11. Preliminary Process and Market Evaluation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Process and Market Evaluation (1.95 MB) More Documents & Publications Market Effects of the Better Buildings Neighborhood Program, Final Evaluation Volume 5 Preliminary ...

  12. Preliminary Hazards Analysis Plasma Hearth Process

    SciTech Connect (OSTI)

    Aycock, M.; Coordes, D.; Russell, J.; TenBrook, W.; Yimbo, P.

    1993-11-01

    This Preliminary Hazards Analysis (PHA) for the Plasma Hearth Process (PHP) follows the requirements of United States Department of Energy (DOE) Order 5480.23 (DOE, 1992a), DOE Order 5480.21 (DOE, 1991d), DOE Order 5480.22 (DOE, 1992c), DOE Order 5481.1B (DOE, 1986), and the guidance provided in DOE Standards DOE-STD-1027-92 (DOE, 1992b). Consideration is given to ft proposed regulations published as 10 CFR 830 (DOE, 1993) and DOE Safety Guide SG 830.110 (DOE, 1992b). The purpose of performing a PRA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PRA then is followed by a Preliminary Safety Analysis Report (PSAR) performed during Title I and II design. This PSAR then leads to performance of the Final Safety Analysis Report performed during construction, testing, and acceptance and completed before routine operation. Radiological assessments indicate that a PHP facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous material assessments indicate that a PHP facility will be a Low Hazard facility having no significant impacts either onsite or offsite to personnel and the environment.

  13. Final Report Appendices: Preliminary Process and Market Evaluation...

    Broader source: Energy.gov (indexed) [DOE]

    ... PERCENT Other building envelope services 100% APPENDIX F: FREQUENCY OUTPUTS Page F-35 PRELIMINARY PROCESS AND MARKET EVALUATION: BETTER BUILDINGS NEIGHBORHOOD PROGRAM ...

  14. Final Report Appendices: Preliminary Process and Market Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program: Report Appendices Market Effects of the Better Buildings Neighborhood Program, Final Evaluation ...

  15. Preliminary Process and Market Evaluation: Better Buildings Neighborho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Market Effects of the Better Buildings Neighborhood Program, Final ...

  16. Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program, Final report | Department of Energy Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, Final report Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, Final report This document presents the findings from the preliminary impact evaluation of the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program (BBNP). The report was prepared in partial fulfillment of a contract with the Lawrence Berkeley National

  17. East Mesa Magmamax Power Process Geothermal Generating Plant, A Preliminary

    Office of Scientific and Technical Information (OSTI)

    Analysis (Conference) | SciTech Connect East Mesa Magmamax Power Process Geothermal Generating Plant, A Preliminary Analysis Citation Details In-Document Search Title: East Mesa Magmamax Power Process Geothermal Generating Plant, A Preliminary Analysis During recent months, Magma Power Company has been involved in the shakedown and startup of their 10 MW binary cycle power plant at East Mesa in the Imperial Valley of Southern California. This pilot plant has been designed specifically as an

  18. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program: Report Appendices

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012.

  19. Federal ESPC Process Phase 2: ESCO Selection and Preliminary Assessment

    Broader source: Energy.gov [DOE]

    During phase 2 of the energy savings performance contract (ESPC) process, the agency selects an energy service company (ESCO) to proceed with project development. The selection process includes notifying all indefinite-delivery, indefinite-quantity (IDIQ) ESCOs of the opportunity, reviewing ESCO responses, and down-selecting to two or more ESCOs, then further down-selecting to one ESCO to perform a preliminary assessment (PA).

  20. Preliminary evaluation of alternative ethanol/water separation processes

    SciTech Connect (OSTI)

    Eakin, D.E.; Donovan, J.M.; Cysewski, G.R.; Petty, S.E.; Maxham, J.V.

    1981-05-01

    Preliminary evaluation indicates that separation of ethanol and water can be accomplished with less energy than is now needed in conventional distillation processes. The state of development for these methods varies from laboratory investigation to commercially available processes. The processes investigated were categorized by type of separation depending on their ability to achieve varying degrees of ethanol/water separation. The following methods were investigated: ethanol extraction with CO/sub 2/ (the A.D. Little process); solvent extraction of ethanol; vacuum distillation; vapor recompression distillation; dehydration with fermentable grains; low temperature blending with gasoline; molecular sieve adsorption; and reverse osmosis.

  1. Final Report: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Funded By: Prepared By: December 28, 2012 PRELIMINARY PROCESS AND MARKET EVALUATION: BETTER BUILDINGS NEIGHBORHOOD PROGRAM RESEARCH INTO ACTION, INC. PO BOX 12312 PORTLAND OR, 97212 WWW.RESEARCHINTOACTION.COM DELIVERY: 3934 NE MARTIN LUTHER KING JR. BLVD., SUITE 300 PORTLAND, OR 97212 (DELIVERY) TELEPHONE: 503.287.9136 FAX: 503.281.7375 CONTACT: JANE S. PETERS, PRESIDENT JANEP@RESEARCHINTOACTION.COM PRELIMINARY

  2. Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Funded By: Prepared By: December 28, 2012 PRELIMINARY PROCESS AND MARKET EVALUATION: BETTER BUILDINGS NEIGHBORHOOD PROGRAM RESEARCH INTO ACTION, INC. PO BOX 12312 PORTLAND OR, 97212 WWW.RESEARCHINTOACTION.COM DELIVERY: 3934 NE MARTIN LUTHER KING JR. BLVD., SUITE 300 PORTLAND, OR 97212 (DELIVERY) TELEPHONE: 503.287.9136 FAX: 503.281.7375 CONTACT: JANE S. PETERS, PRESIDENT JANEP@RESEARCHINTOACTION.COM

  3. Preliminary Process and Market Evaluation: Better Buildings Neighborho...

    Energy Savers [EERE]

    Technical Report (2.64 MB) Technical Report Appendix (1.86 MB) More Documents & Publications Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation ...

  4. Preliminary Results of Cleaning Process for Lubricant Contamination

    SciTech Connect (OSTI)

    Eisenmann, D.; Brasche, L.; Lopez, R.

    2006-03-06

    Fluorescent penetrant inspection (FPI) is widely used for aviation and other components for surface-breaking crack detection. As with all inspection methods, adherence to the process parameters is critical to the successful detection of defects. Prior to FPI, components are cleaned using a variety of cleaning methods which are selected based on the alloy and the soil types which must be removed. It is also important that the cleaning process not adversely affect the FPI process. There are a variety of lubricants and surface coatings used in the aviation industry which must be removed prior to FPI. To assess the effectiveness of typical cleaning processes on removal of these contaminants, a study was initiated at an airline overhaul facility. Initial results of the cleaning study for lubricant contamination in nickel, titanium and aluminum alloys will be presented.

  5. Experience base for Radioactive Waste Thermal Processing Systems: A preliminary survey

    SciTech Connect (OSTI)

    Mayberry, J.; Geimer, R.; Gillins, R.; Steverson, E.M.; Dalton, D.; Anderson, G.L.

    1992-04-01

    In the process of considering thermal technologies for potential treatment of the Idaho National Engineering Laboratory mixed transuranic contaminated wastes, a preliminary survey of the experience base available from Radioactive Waste Thermal Processing Systems is reported. A list of known commercial radioactive waste facilities in the United States and some international thermal treatment facilities are provided. Survey focus is upon the US Department of Energy thermal treatment facilities. A brief facility description and a preliminary summary of facility status, and problems experienced is provided for a selected subset of the DOE facilities.

  6. Preliminary time-phased TWRS process model results

    SciTech Connect (OSTI)

    Orme, R.M.

    1995-03-24

    This report documents the first phase of efforts to model the retrieval and processing of Hanford tank waste within the constraints of an assumed tank farm configuration. This time-phased approach simulates a first try at a retrieval sequence, the batching of waste through retrieval facilities, the batching of retrieved waste through enhanced sludge washing, the batching of liquids through pretreatment and low-level waste (LLW) vitrification, and the batching of pretreated solids through high-level waste (HLW) vitrification. The results reflect the outcome of an assumed retrieval sequence that has not been tailored with respect to accepted measures of performance. The batch data, composition variability, and final waste volume projects in this report should be regarded as tentative. Nevertheless, the results provide interesting insights into time-phased processing of the tank waste. Inspection of the composition variability, for example, suggests modifications to the retrieval sequence that will further improve the uniformity of feed to the vitrification facilities. This model will be a valuable tool for evaluating suggested retrieval sequences and establishing a time-phased processing baseline. An official recommendation on tank retrieval sequence will be made in September, 1995.

  7. February 13, 2013 Webinar: Preliminary Process and Market Evaluation – Better Buildings Neighborhood Program Webcast

    Broader source: Energy.gov [DOE]

    February 13, 2013 Webinar: Preliminary Process and Market Evaluation – Better Buildings Neighborhood Program Webcast ; Better Buildings Neighborhood Program; national program with a goal of identifying what elements of grantee programs are most successful at bringing about market changes that will result in sustainable energy savings

  8. Technical and economic evaluation of selected coal-liquefaction processes. Phase O. Preliminary screening evaluations

    SciTech Connect (OSTI)

    Salmon, R.; Forrester, R.C. III; Singh, S.P.N.; Fisher, J.F.; Wham, R.M.; Thiel, S.W.; Meyer, J.P.

    1981-04-01

    Preliminary scoping evaluations of ten conceptual coal liquefaction processes were made for the Department of Energy using available published information. Production costs calculated under a consistent set of economic criteria varied from $0.78 to $1.47/gal for gasoline in constant 1979 dollars. However, existing design documents showed little consistency as to status of process development, credibility of process design basis, completeness of design, or conservatism of cost estimation. We concluded that a more complete and thorough design study of each process would be necessary to achieve any degree of technical and economic consistency, and that it was therefore not possible to satisfy DOE's desire for consistent technical and economic comparisons in this type of preliminary scoping study.

  9. Preliminary evaluation of alternative waste form solidification processes. Volume I. Identification of the processes.

    SciTech Connect (OSTI)

    Treat, R.L.; Nesbitt, J.F.; Blair, H.T.; Carter, J.G.; Gorton, P.S.; Partain, W.L.; Timmerman, C.L.

    1980-04-01

    This document contains preconceptual design data on 11 processes for the solidification and isolation of nuclear high-level liquid wastes (HLLW). The processes are: in-can glass melting (ICGM) process, joule-heated glass melting (JHGM) process, glass-ceramic (GC) process, marbles-in-lead (MIL) matrix process, supercalcine pellets-in-metal (SCPIM) matrix process, pyrolytic-carbon coated pellets-in-metal (PCCPIM) matrix process, supercalcine hot-isostatic-pressing (SCHIP) process, SYNROC hot-isostatic-pressing (SYNROC HIP) process, titanate process, concrete process, and cermet process. For the purposes of this study, it was assumed that each of the solidification processes is capable of handling similar amounts of HLLW generated in a production-sized fuel reprocessing plant. It was also assumed that each of the processes would be enclosed in a shielded canyon or cells within a waste facility located at the fuel reprocessing plant. Finally, it was assumed that all of the processes would be subject to the same set of regulations, codes and standards. Each of the solidification processes converts waste into forms that may be acceptable for geological disposal. Each process begins with the receipt of HLLW from the fuel reprocessing plant. In this study, it was assumed that the original composition of the HLLW would be the same for each process. The process ends when the different waste forms are enclosed in canisters or containers that are acceptable for interim storage. Overviews of each of the 11 processes and the bases used for their identification are presented in the first part of this report. Each process, including its equipment and its requirements, is covered in more detail in Appendices A through K. Pertinent information on the current state of the art and the research and development required for the implementation of each process are also noted in the appendices.

  10. Preliminary process simulation and analysis of GMODS: Processing of plutonium surplus materials

    SciTech Connect (OSTI)

    Ferrada, J.J.; Nehls, J.W. Jr.; Welch, T.D.; Giardina, J.L.; Forsberg, C.W.; Maliyekkel, A.T.

    1996-01-02

    To address growing concerns in the areas of arms control, control of fissile materials, waste management, and environment and health, the US Department of Energy is studying and evaluating various options for the control and disposal of surplus fissile materials (SFMs). One of the options under consideration is the Glass Material Oxidation and Dissolution System (GMODS) which directly converts plutonium-bearing materials such as metals, ceramics, and organics into a durable-high-quality glass for long-term storage or a waste form for disposal. This study undertook the development of a computer simulation of the GMODS process using FLOW. That computer simulation was used to perform an assessment of how GMODS would handle the treatment of plutonium, rich scrap (RS) and lead scrap (LS), and identify critical process parameters. Among the key process parameters affecting the glass formation were processing temperatures, additives, and the effects of varying them on the final product. This assessment looked at the quantity of glass produced, the quality of the final glass form, and the effect of blending different groups of the feed streams on the glass produced. The model also provided a way to study the current process assumptions and determine in which areas more experimental studies are required. The simulation showed that the glass chemistry postulated in the models is workable. It is expected that the glass chemistry assumed during the modeling process can be verified by the results of the laboratory experiments that are currently being conducted relating to the GMODS process.Further waste characterization, especially of the SFM waste streams not studied in this report, will provide more nearly accurate results and give a more detailed evaluation of the GMODS process.

  11. EECBG BBNP Final Technical Report

    SciTech Connect (OSTI)

    Energy, Austin

    2014-01-30

    City of Austin / Austin Energy’s Better Building Neighborhood Program grant accomplishments and lessons learned.

  12. Preliminary Results of Voloxidation Processing of Kilogram Quantities of Used Nuclear Fuel

    SciTech Connect (OSTI)

    Spencer, Barry B; DelCul, Guillermo D; Jubin, Robert Thomas; Owens, R Steven; Ramey, Dan W; Collins, Emory D

    2009-01-01

    -substituted zeolite to capture iodine (e.g. as AgI), a caustic scrubber to collect carbon dioxide (including 14CO2), a hydrogen-substituted mordenite to capture krypton (e.g. 85Kr) by cryogenic temperature swing adsorption, and a silver-substituted mordenite to capture xenon by cryogenic temperature swing absorption. The quantities of these volatile gases collected were compared to ORIGEN calculations to estimate the effectiveness of the voloxidation process to separate the volatiles from the used fuel. This paper will describe the voloxidation system and present preliminary results from the second processing campaign.

  13. Appraisal of the Uranium Processing Facility Safety Basis Preliminary Safety Design Report Process at the Y-12 National Security Complex, May 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Appraisal of the Uranium Processing Facility Safety Basis Preliminary Safety Design Report Process at the Y-12 National Security Complex May 2011 May 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose

  14. Waste Receiving and Processing Facility Module 1: Volume 1, Preliminary Design report

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The Preliminary Design Report (Title 1) for the Waste Receiving and Processing (WRAP) Module 1 provides a comprehensive narrative description of the proposed facility and process systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title 1 design. The primary mission of the WRAP 1 Facility is to characterize and certify contact-handled (CH) waste in 55-gallon drums for disposal. Its secondary function is to certify CH waste in Standard Waste Boxes (SWBs) for disposal. The preferred plan consist of retrieving the waste and repackaging as necessary in the Waste Receiving and Processing (WRAP) facility to certify TRU waste for shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico. WIPP is a research and development facility designed to demonstrate the safe and environmentally acceptable disposal of TRU waste from National Defense programs. Retrieved waste found to be Low-Level Waste (LLW) after examination in the WRAP facility will be disposed of on the Hanford site in the low-level waste burial ground. The Hanford Site TRU waste will be shipped to the WIPP for disposal between 1999 and 2013.

  15. Illinois biomass resources: annual crops and residues; canning and food-processing wastes. Preliminary assessment

    SciTech Connect (OSTI)

    Antonopoulos, A A

    1980-06-01

    Illinois, a major agricultural and food-processing state, produces vast amounts of renewable plant material having potential for energy production. This biomass, in the form of annual crops, crop residues, and food-processing wastes, can be converted to alternative fuels (such as ethanol) and industrial chemicals (such as furfural, ethylene, and xylene). The present study provides a preliminary assessment of these Illinois biomass resources, including (a) an appraisal of the effects of their use on both agriculture and industry; (b) an analysis of biomass conversion systems; and (c) an environmental and economic evaluation of products that could be generated from biomass. It is estimated that, of the 39 x 10/sup 6/ tons of residues generated in 1978 in Illinois from seven main crops, about 85% was collectible. The thermal energy equivalent of this material is 658 x 10/sup 6/ Btu, or 0.66 quad. And by fermenting 10% of the corn grain grown in Illinois, some 323 million gallons of ethanol could have been produced in 1978. Another 3 million gallons of ethanol could have been produced in the same year from wastes generated by the state's food-processing establishments. Clearly, Illinois can strengthen its economy substantially by the development of industries that produce biomass-derived fuels and chemicals. In addition, a thorough evaluation should be made of the potential for using the state's less-exploitable land for the growing of additional biomass.

  16. A process for treatment of APC residues from municipal solid waste incinerators: Preliminary results

    SciTech Connect (OSTI)

    Hjelmar, O.; Birch, H.

    1997-12-01

    The problem of environmentally safe management of the residues from air pollution control (APC) systems at municipal solid waste (MSW) incinerators, particularly the residues from the semidry/dry acid gas cleaning processes (dry scrubber residues), has not yet been solved in a satisfactory and sustainable manner. These residues are in many cases simply stored indefinitely in big bags or they are landfilled under conditions that in the long term may not be able to prevent potentially harmful constituents from leaching and leaking into the environment. The APC residues, including fly ash, are in many countries classified as hazardous or special waste due to their high contents of soluble salts (particularly calcium chloride) and trace elements/heavy metals. The semidry/dry APC residues are strongly alkaline due to a content of excess lime, and the high pH favours the leaching of several contaminants, particularly lead. This paper presents preliminary results of a study of a process for treatment of semidry/dry APC residues and fly ash from MSW incinerators. In the process the contaminants are partly removed, partly immobilized thus improving the above mentioned situation and allowing for subsequent safe management (i.e. utilization or landfilling) of the treated residues.

  17. Turbine fuels from tar sands bitumen and heavy oil. Phase I. Preliminary process analysis. Interim report, 8 July 1983-9 April 1984

    SciTech Connect (OSTI)

    Talbot, A.F.; Elanchenny, V.; Macris, A.; Schwedock, J.P.

    1985-04-09

    The strategic potential of domestic bitumens and heavy crude oils as substitutes for imported crude rests with their efficient conversion into aviation turbine fuels. In this Phase I study, preliminary analyses of several processing schemes were performed. The comparison included both hydrogen-addition and carbon-rejection upgrading processes. Projected JP-4 yields, costs, and thermal efficiencies suggest further exploration of the hydrovisbreaking process. For Phase II, laboratory-scale demonstration of the recommended process is proposed.

  18. Preliminary results for a two-dimensional simulation of the working process of a Stirling engine

    SciTech Connect (OSTI)

    Makhkamov, K.K.; Ingham, D.B.

    1998-07-01

    Stirling engines have several potential advantages over existing types of engines, in particular they can use renewable energy sources for power production and their performance meets the demands on the environmental security. In order to design Stirling Engines properly, and to put into effect their potential performance, it is important to more accurately mathematically simulate its working process. At present, a series of very important mathematical models are used for describing the working process of Stirling Engines and these are, in general, classified as models of three levels. All the models consider one-dimensional schemes for the engine and assume a uniform fluid velocity, temperature and pressure profiles at each plane of the internal gas circuit of the engine. The use of two-dimensional CFD models can significantly extend the capabilities for the detailed analysis of the complex heat transfer and gas dynamic processes which occur in the internal gas circuit, as well as in the external circuit of the engine. In this paper a two-dimensional simplified frame (no construction walls) calculation scheme for the Stirling Engine has been assumed and the standard {kappa}-{var{underscore}epsilon} turbulence model has been used for the analysis of the engine working process. The results obtained show that the use of two-dimensional CFD models gives the possibility of gaining a much greater insight into the fluid flow and heat transfer processes which occur in Stirling Engines.

  19. Preliminary evaluation of a concept using microwave energy to improve an adsorption-based, natural gas clean-up process

    SciTech Connect (OSTI)

    Grimes, R.W.

    1992-12-01

    This report describes the results of a preliminary evaluation performed to: (1) determine if microwave energy could be used to regenerate a zeolite adsorbent and (2) to evaluate the feasibility of using microwave energy to improve the desorption phase of a pressure swing adsorption process applied to upgrading natural gas (methane) contaminated with nitrogen. Microwave regeneration was evaluated by comparing the adsorption characteristics of a zeolite preconditioned by heating under vacuum to the characteristics of the same zeolite after various lengths of exposure to microwave energy. The applicability of microwave regeneration to natural gas cleanup was evaluated by measuring the rise in adsorbent temperature resulting from the microwave exposure. Microwave energy consumed by heating the adsorbent is not productive and must therefore be minimal for a process to be economically viable. Exposure of the methane-saturated chabazite for 2 minutes to microwave energy effectively regenerated the adsorbent, but resulted in a 75{degrees}F (42{degrees}C) rise in adsorbent temperature. This temperature rise indicates that the concept is unacceptable for natural gas processing due to excessive energy consumption.

  20. Preliminary Evaluation of Cesium Distribution for Wet Sieving Process Planned for Soil Decontamination in Japan - 13104

    SciTech Connect (OSTI)

    Enokida, Y.; Tanada, Y.; Hirabayashi, D.; Sawada, K.

    2013-07-01

    For the purpose of decontaminating radioactive cesium from a huge amount of soil, which has been estimated to be 1.2x10{sup 8} m{sup 3} by excavating to a 5-cm depth from the surface of Fukushima Prefecture where a severe nuclear accident occurred at TEPCO's power generating site and has emitted a significant amount of radioactive materials, mainly radioactive cesium, a wet sieving process was selected as one of effective methods available in Japan. Some private companies have demonstrated this process for soil treatment in the Fukushima area by testing at their plants. The results were very promising, and a full-fledged application is expected to follow. In the present study, we spiked several aqueous samples containing soil collected from an industrial wet sieving plant located near our university for the recycling of construction wastes with non-radioactive cesium hydroxide. The present study provides scientific data concerning the effectiveness in volume reduction of the contaminated soil by a wet sieving process as well as the cesium distribution between the liquid phase and clay minerals for each sub-process of the full-scale one, but a simulating plant equipped with a process of coagulating sedimentation and operational safety fundamentals for the plant. Especially for the latter aspect, the study showed that clay minerals of submicron size strongly bind a high content of cesium, which was only slightly removed by coagulation with natural sedimentation (1 G) nor centrifugal sedimentation (3,700 G) and some of the cesium may be transferred to the effluent or recycled water. By applying ultracentrifugation (257,000 G), most of submicron clay minerals containing cesium was removed, and the cesium amount which might be transferred to the effluent or recycled water, could be reduced to less than 2.3 % of the original design by the addition of a cesium barrier consisting of ultracentrifugation or a hollow fiber membrane. (authors)

  1. Final Report Appendices. Preliminary Process and Market Evaluation. Better Buildings Neighborhood Program

    SciTech Connect (OSTI)

    Peters, Jane S.

    2012-12-28

    This document was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, usefulness, or any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, re commendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.

  2. Chemical and physical processes in Tank 241-SY-101: A preliminary report

    SciTech Connect (OSTI)

    Not Available

    1991-02-01

    Since 1942, chemical and radioactive waste have been stored in underground tanks at the Hanford Site. In March 1981 one of the double shell tanks, 241-SY-101 (called 101-SY), began venting large quantities of gas, primarily hydrogen and nitrous oxide. Because of the potential for explosion Westinghouse Hanford Company and the US Department of Energy realized the need for knowledge about the processes occurring in this tank that lead to generation of the gases. In June 1990, the Pacific Northwest Laboratory began assembling a Tank Waste Science Panel to develop a better understanding of the processes occurring the Tank 101-SY. This knowledge is necessary to provide a technically defensible basis for the safety analyses, which will allow the tank contents to be sampled, as well as for the future remediation of the tank and its contents. The Panel concluded that the data available on Tank 101-SY are insufficient to allow the critical chemical and physical processes giving rise to gas formation and release to be unambiguously identified. To provide the needed information the Panel recommends that Tank 101-SY by physically and chemically characterized as fully as possible and as expeditiously as safety considerations allow, and laboratory studies and modeling efforts be undertaken the chemical and physical processes involved in gas generation and release. Finally, the Panel recommends that no remediation steps be taken until there is a better understanding of the chemical and physical phenomena occurring in Tank 101-SY. Premature remediation steps may only serve to compound the problem. Furthermore, such steps may change the chemical and physical characteristics of the tank and prevent a true understanding of the phenomena involved. As a consequence, similar problems in other tanks on the site may not be adequately addressed. 17 refs., 3 figs., 1 tab.

  3. Preliminary flowsheet: Ion exchange process for the separation of cesium from Hanford tank waste using Duolite{trademark} CS-100 resin

    SciTech Connect (OSTI)

    Eager, K.M.; Penwell, D.L.; Knutson, B.J.

    1994-12-01

    This preliminary flowsheet document describes an ion exchange process which uses Duolite{trademark} CS-100 resin to remove cesium from Hanford Tank waste. The flowsheet describes one possible equipment configuration, and contains mass balances based on that configuration with feeds of Neutralized Current Acid Waste, and Double Shell Slurry Feed. Process alternatives, unresolved issues, and development needs are discussed which relate to the process.

  4. Geochemical studies of reservoir processes in the NCPA field of The Geysers, a preliminary report

    SciTech Connect (OSTI)

    Truesdell, Alfred; Enedy, Steve; Smith, Bill

    1993-01-28

    Methods of tracing reservoir processes will be discussed and applied to the NCPA Geysers steam field. The gas and isotope chemistry of produced steam is far from uniform even in a restricted volume of the reservoir. The composition is affected by many factors. Differences in permeability, local existence of gas pockets or perched liquid and the pattern of fracture connection can cause neighboring wells to produce steam of different compositions. This study attempts to separate local effects from general influences by viewing the data across the field and over a period of time. The fits of the trend lines to the data are far from perfect but present a reasonably consistent picture.

  5. Preliminary Feasibility Assessment of Integrating CCHP with NW Food Processing Plant #1: Modeling Documentation

    SciTech Connect (OSTI)

    Hoffman, Michael G.; Srivastava, Viraj; Wagner, Anne W.; Makhmalbaf, Atefe; Thornton, John

    2014-01-01

    The Pacific Northwest National Laboratory (PNNL) has launched a project funded by the Bonneville Power Association (BPA) to identify strategies for increasing industrial energy efficiency and reducing energy costs of Northwest Food Processors Association (NWFPA) plants through deployment of novel combinations and designs of variable-output combined heat and power (CHP) distributed generation (DG), combined cooling, heating and electric power (CCHP) DG and energy storage systems. Detailed evaluations and recommendations of CHP and CCHP DG systems will be performed for several Northwest (NW) food processing sites. The objective is to reduce the overall energy use intensity of NW food processors by 25% by 2020 and by 50% by 2030, as well as reducing emissions and understanding potential congestion reduction impacts on the transmission system in the Pacific Northwest.

  6. West Village Community: Quality Management Processes and Preliminary Heat Pump Water Heater Performance

    SciTech Connect (OSTI)

    Dakin, B.; Backman, C.; Hoeschele, M.; German, A.

    2012-11-01

    West Village, a multi-use project underway at the University of California Davis, represents a ground-breaking sustainable community incorporating energy efficiency measures and on-site renewable generation to achieve community-level Zero Net Energy (ZNE) goals. The project when complete will provide housing for students, faculty, and staff with a vision to minimize the community's impact on energy use by reducing building energy use, providing on-site generation, and encouraging alternative forms of transportation. This focus of this research is on the 192 student apartments that were completed in 2011 under Phase I of the West Village multi-year project. The numerous aggressive energy efficiency measures implemented result in estimated source energy savings of 37% over the B10 Benchmark. There are two primary objectives of this research. The first is to evaluate performance and efficiency of the central heat pump water heaters as a strategy to provide efficient electric water heating for net-zero all-electric buildings and where natural gas is not available on site. In addition, effectiveness of the quality assurance and quality control processes implemented to ensure proper system commissioning and to meet program participation requirements is evaluated. Recommendations for improvements that could improve successful implementation for large-scale, high performance communities are identified.

  7. West Village Community. Quality Management Processes and Preliminary Heat Pump Water Heater Performance

    SciTech Connect (OSTI)

    Dakin, B.; Backman, C.; Hoeschele, M.; German, A.

    2012-11-01

    West Village, a multi-use project underway at the University of California Davis, represents a ground-breaking sustainable community incorporating energy efficiency measures and on-site renewable generation to achieve community-level Zero Net Energy (ZNE) goals. When complete, the project will provide housing for students, faculty, and staff with a vision to minimize the community’s impact on energy use by reducing building energy use, providing on-site generation, and encouraging alternative forms of transportation. This focus of this research is on the 192 student apartments that were completed in 2011 under Phase I of the West Village multi-year project. The numerous aggressive energy efficiency measures implemented result in estimated source energy savings of 37% over the B10 Benchmark. There are two primary objectives of this research. The first is to evaluate performance and efficiency of the central heat pump water heaters as a strategy to provide efficient electric water heating for net-zero all-electric buildings and where natural gas is not available on site. In addition, effectiveness of the quality assurance and quality control processes implemented to ensure proper system commissioning and to meet program participation requirements is evaluated. Recommendations for improvements that could improve successful implementation for large-scale, high performance communities are identified.

  8. Preliminary Screening

    Broader source: Energy.gov [DOE]

    The first step in assessing renewable energy options is to conduct a preliminary screening to decide which technologies are worth investigating and which can be eliminated immediately. Preliminary...

  9. Preliminary carburizing of medium-carbon steel as a factor increasing corrosion resistance of diffusion layers produced by means of vacuum chromizing process

    SciTech Connect (OSTI)

    Kasprzycka, E.; Tacikowski, J.; Liliental, W.

    1995-12-31

    Diffusion layers produced on a steel surface by means of the vacuum chromizing process has been studied. The effect of preliminary carburizing of medium-carbon steel on a chromized layer structure and its corrosion resistance has been investigated. Studies of layer thickness, its morphology, the phase composition, and Cr and Fe depth profiles in the diffusion zone of chromized steel specimens in the aggressive media of the food industry has been determined. For corrosion resistance tests chromized layers of different structure have been used: two-phase layers (consisting of a carbide layer and a solution zone) produced on the medium-carbon steel, monophase carbide layers produced on the surface of preliminary carburized medium-carbon steel and monophase solution layers produced on Armco iron. It has been proved that the corrosion resistance of monophase hard carbide layers, as well as of monophase solution layers is higher than that for two-phase layers. The results obtained by the described method indicate that the preliminary carburizing of medium-carbon steel significantly increases corrosion resistance of diffusion layers produced by means of the vacuum chromizing process.

  10. Preliminary Safety Design RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety Design RM Preliminary Safety Design RM The Preliminary Safety Design (PSD) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the Preliminary Safety Design work, processes and documentation prior to approval of CD-2. Preliminary Safety Design RM (2.29 MB) More Documents & Publications Conceptual Safety Design RM Preliminary Safety Design RM CD-1, Approve Alternative Selection and Cost Range Seismic Design Expectations Report

  11. Two stage fluid bed-plasma gasification process for solid waste valorisation: Technical review and preliminary thermodynamic modelling of sulphur emissions

    SciTech Connect (OSTI)

    Morrin, Shane; Lettieri, Paola; Chapman, Chris; Mazzei, Luca

    2012-04-15

    Highlights: Black-Right-Pointing-Pointer We investigate sulphur during MSW gasification within a fluid bed-plasma process. Black-Right-Pointing-Pointer We review the literature on the feed, sulphur and process principles therein. Black-Right-Pointing-Pointer The need for research in this area was identified. Black-Right-Pointing-Pointer We perform thermodynamic modelling of the fluid bed stage. Black-Right-Pointing-Pointer Initial findings indicate the prominence of solid phase sulphur. - Abstract: Gasification of solid waste for energy has significant potential given an abundant feed supply and strong policy drivers. Nonetheless, significant ambiguities in the knowledge base are apparent. Consequently this study investigates sulphur mechanisms within a novel two stage fluid bed-plasma gasification process. This paper includes a detailed review of gasification and plasma fundamentals in relation to the specific process, along with insight on MSW based feedstock properties and sulphur pollutant therein. As a first step to understanding sulphur partitioning and speciation within the process, thermodynamic modelling of the fluid bed stage has been performed. Preliminary findings, supported by plant experience, indicate the prominence of solid phase sulphur species (as opposed to H{sub 2}S) - Na and K based species in particular. Work is underway to further investigate and validate this.

  12. Preliminary evaluation of SF/sub 6/ conversion to SO/sub 2/ using existing chemical processing facilities

    SciTech Connect (OSTI)

    Reiner, R.H.; VanLaethem, L.M.; Partin, H.B.

    1984-06-01

    Conversion of SF/sub 6/ to SO/sub 2/ has been demonstrated using equipment compatible with existing pilot plant facilities. However, while reduction of SF/sub 6/ to iron sulfide has been demonstrated as an efficient, economic, and scalable process operation, oxidation of the sulfide to SO/sub 2/ causes serious compatibility problems in existing (and commonly used) reactor materials. Further characterization of the sulfide oxidation is necessary to determine the usefulness of this conversion process. 13 refs., 4 tabs.

  13. Pilot-Scale Silicone Process for Low-Cost Carbon Dioxide Capture Preliminary Techno-Economic Analysis

    SciTech Connect (OSTI)

    Singh, Surinder; Spiry, Irina; Wood, Benjamin; Hance, Dan; Chen, Wei; Kehmna, Mark; McDuffie, Dwayne

    2014-03-31

    This report presents system and economic analysis for a carbon-capture unit which uses an aminosilicone-based solvent for CO{sub 2} capture in a pulverized coal (PC) boiler. The aminosilicone solvent is a 60/40 wt/wt mixture of 3-aminopropyl end-capped polydimethylsiloxane (GAP-1m) with tri-ethylene glycol (TEG) as a co-solvent. For comparison purposes, the report also shows results for a carbon-capture unit based on a conventional approach using mono-ethanol amine (MEA). The first year removal cost of CO{sub 2} for the aminosilicone-based carbon-capture process is $46.04/ton of CO2 as compared to $60.25/ton of CO{sub 2} when MEA is used. The aminosilicone-based process has <77% of the CAPEX of a system using MEA solvent. The lower CAPEX is due to several factors, including the higher working capacity of the aminosilicone solvent compared the MEA, which reduces the solvent flow rate required, reducing equipment sizes. If it is determined that carbon steel can be used in the rich-lean heat exchanger in the carbon capture unit, the first year removal cost of CO{sub 2} decreases to $44.12/ton. The aminosilicone-based solvent has a higher thermal stability than MEA, allowing desorption to be conducted at higher temperatures and pressures, decreasing the number of compressor stages needed. The aminosilicone-based solvent also has a lower vapor pressure, allowing the desorption to be conducted in a continuous-stirred tank reactor versus a more expensive packed column. The aminosilicone-based solvent has a lower heat capacity, which decreases the heat load on the desorber. In summary, the amino-silicone solvent has significant advantages over conventional systems using MEA.

  14. MODELING THE IMPACT OF ELEVATED MERCURY IN DEFENSE WASTE PROCESSING FACILITY MELTER FEED ON THE MELTER OFF-GAS SYSTEM-PRELIMINARY REPORT

    SciTech Connect (OSTI)

    Zamecnik, J.; Choi, A.

    2010-08-18

    The Defense Waste Processing Facility (DWPF) is currently evaluating an alternative Chemical Process Cell (CPC) flowsheet to increase throughput. It includes removal of the steam-stripping step, which would significantly reduce the CPC processing time and lessen the sampling needs. However, its downside would be to send 100% of the mercury that comes in with the sludge straight to the melter. For example, the new mercury content in the Sludge Batch 5 (SB5) melter feed is projected to be 25 times higher than that in the SB4 with nominal steam stripping of mercury. This task was initiated to study the impact of the worst-case scenario of zero-mercury-removal in the CPC on the DWPF melter offgas system. It is stressed that this study is intended to be scoping in nature, so the results presented in this report are preliminary. In order to study the impact of elevated mercury levels in the feed, it is necessary to be able to predict how mercury would speciate in the melter exhaust under varying melter operating conditions. A homogeneous gas-phase oxidation model of mercury by chloride was developed to do just that. The model contains two critical parameters pertaining to the partitioning of chloride among HCl, Cl, Cl{sub 2}, and chloride salts in the melter vapor space. The values for these parameters were determined at two different melter vapor space temperatures by matching the calculated molar ratio of HgCl (or Hg{sub 2}Cl{sub 2}) to HgCl{sub 2} with those measured during the Experimental-Scale Ceramic Melter (ESCM) tests run at the Pacific Northwest National Laboratory (PNNL). The calibrated model was then applied to the SB5 simulant used in the earlier flowsheet study with an assumed mercury stripping efficiency of zero; the molar ratio of Cl-to-Hg in the resulting melter feed was only 0.4, compared to 12 for the ESCM feeds. The results of the model run at the indicated melter vapor space temperature of 650 C (TI4085D) showed that due to excessive shortage of

  15. NRT preliminary design

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    preliminary design - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... SunShot Grand Challenge: Regional Test Centers NRT preliminary design HomeTag:NRT ...

  16. Wet Gasification of Ethanol Residue: A Preliminary Assessment

    SciTech Connect (OSTI)

    Brown, Michael D.; Elliott, Douglas C.

    2008-09-22

    A preliminary technoeconomic assessment has been made of several options for the application of catalytic hydrothermal gasification (wet gasification) to ethanol processing residues.

  17. Preliminary laboratory study of plutonium-238 dissolution from Mound soil by means of the ACT*DE*CON{sup SM} process

    SciTech Connect (OSTI)

    Brown, K.A.; Heinrich, R.R.; Johnson, D.O.; Edgar, D.E.

    1992-04-01

    The treatment of contaminated soil presents a significant technical problem. Soil-washing and chemical-extraction methods have proven to be effective for specific applications, but a process with more comprehensive treatment properties that is both cost-effective and environmentally propitious is needed. Bradtec, Inc., has developed a process, the ACT*DE*CON{sup SM} process, that has been tested on soil contaminated with plutonium. The process effectively extracted Pu-238 after three washes, reducing the contamination levels from approximately 20 Bq/g to 1.6--1.9 Bq/g and yielding a decontamination factor ranging from 11 to 13. By using four or more ACT*DE*CON{sup SM} washes or a continuous-flow process with ACT*DE*CON{sup SM} solvents on a pilot-scale test, a target decontamination level of 0.93 Bq/g might be achievable.

  18. Preliminary laboratory study of plutonium-238 dissolution from Mound soil by means of the ACT*DE*CON sup SM process

    SciTech Connect (OSTI)

    Brown, K.A.; Heinrich, R.R.; Johnson, D.O.; Edgar, D.E. )

    1992-04-01

    The treatment of contaminated soil presents a significant technical problem. Soil-washing and chemical-extraction methods have proven to be effective for specific applications, but a process with more comprehensive treatment properties that is both cost-effective and environmentally propitious is needed. Bradtec, Inc., has developed a process, the ACT*DE*CON{sup SM} process, that has been tested on soil contaminated with plutonium. The process effectively extracted Pu-238 after three washes, reducing the contamination levels from approximately 20 Bq/g to 1.6--1.9 Bq/g and yielding a decontamination factor ranging from 11 to 13. By using four or more ACT*DE*CON{sup SM} washes or a continuous-flow process with ACT*DE*CON{sup SM} solvents on a pilot-scale test, a target decontamination level of 0.93 Bq/g might be achievable.

  19. PRELIMINARY TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE INTEGRATION OF A PROCESS UTILIZING LOW-ENERGY SOLVENTS FOR CARBON DIOXIDE CAPTURE ENABLED BY A COMBINATION OF ENZYMES AND ULTRASONICS WITH A SUBCRITICAL PC POWER PLANT

    SciTech Connect (OSTI)

    Swaminathan, Saravanan; Kuczynska, Agnieszka; Hume, Scott; Mulgundmath, Vinay; Freeman, Charles; Bearden, Mark; Remias, Joe; Ambedkar, Balraj; Salmon, Sonja; House, Alan

    2012-11-01

    The results of the preliminary techno-economic assessment for integrating a process utilizing low-energy solvents for carbon dioxide (CO2) capture enabled by a combination of enzymes and ultrasonics with a subcritical pulverized coal (PC) power plant are presented. Four cases utilizing the enzyme-activated solvent are compared using different methodologies of regeneration against the DOE/NETL reference MEA case. The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as enzyme make-up rate and the capability of the ultrasonic regeneration process. The net efficiency of the integrated PC power plant with CO2 capture changes from 24.9% with the reference Case 10 plant to between 24.34% and 29.97% for the vacuum regeneration options considered, and to between 26.63% and 31.41% for the ultrasonic regeneration options. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variable being the initial estimation of enzyme dosing rate. The LCOE ($/MWh) values range from 112.92 to 125.23 for the vacuum regeneration options and from 108.9 to 117.50 for the ultrasonic regeneration cases considered in comparison to 119.6 for the reference Case 10. A sensitivity analysis of the effect of critical parameters on the LCOE was also performed. The results from the preliminary techno-economic assessment show that the proposed technology can be investigated further with a view to being a viable alternative to conventional CO2 scrubbing technologies.

  20. Transuranic decontamination of nitric acid solutions by the TRUEX solvent extraction process: preliminary development studies. [Octyl(phenyl)-N,N-diisobutylcarbamoylmethylphosphine oxide

    SciTech Connect (OSTI)

    Vandegrift, G.F.; Leonard, R.A.; Steindler, M.J.; Horwitz, E.P.; Basile, L.J.; Diamond, H.; Kalina, D.G.; Kaplan, L.

    1984-07-01

    This report summarizes the work that has been performed to date at Argonne National Laboratory on the development of the TRUEX process, a solvent extraction process employing a bifunctional organophosphorous reagent in a PUREX process solvent (tributyl phosphate-normal paraffinic hydrocarbons). The purpose of this extraction process is to separate and concentrate transuranic (TRU) elements from nuclear waste. Assessments were made of the use of two TRUEX solvents: one incorporating the well-studied dihexyl-N,N-diethylcarbamoylmethylphosphonate (DHDECMP) and a second incorporating an extractant with superior properties for a 1M HNO/sub 3/ acid feed, octyl(phenyl)-N,N-diisobutylcarbamoylmethylphosphine oxide (O/sub phi/D(IB)CMPO). In this report, conceptual flowsheets for the removal of soluble TRUs from high-level nuclear wastes using these two TRUEX proces solvents are presented, and flowsheet features are discussed in detail. The conceptual flowsheet for TRU-element removal from a PUREX waste by the O/sub phi/D(IB)CMPO-TRUEX process solvent was tested in a bench-scale countercurrent experiment, and results of that experiment are presented and discussed. The conclusion of this study is that the TRUEX process is able to separate TRUs from high-level wastes so that the major portion of the solid waste (approx. 99%) can be classified as non-TRU. Areas where more experimentation is needed are listed at the end of the report. 45 references, 17 figures, 56 tables.

  1. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  2. Type II preliminary pilot-plant evaluation of a coal-liquefaction residue - water slurry using vaccum-tower bottoms from the H-Coal liquefaction process

    SciTech Connect (OSTI)

    Wu, C.M.; Robin, A.M.

    1982-09-01

    About 6.7 tons of vacuum tower bottoms (residue) which were obtained during the liquefaction of Illinois No. 6 coal from the H-Coal liquefaction process pilot plant at Catlettsburg, Kentucky were successfully gasified at Texaco's Montebello Research Laboratory. The single 9.5-hour run with H-Coal liquefaction residue-water slurry was completed at 750 to 760 psig gasifier pressure. The run consisted of two test periods, each at a different gasifier temperature. Over 99.6 percent conversion of carbon in the feed to syngas was achieved yielding 32.9 to 33.7 standard cubic feet of dry syngas per pound of residue charged. The oxygen requirement was about 1.0 pound of oxygen per pound of residue. The dry syngas contained 78.5 to 79.7 (vol.) percent carbon monoxide plus hydrogen.

  3. Preliminary Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

  4. Preliminary Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2013-06-28

    Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

  5. Preliminary Safety Design RM

    Office of Environmental Management (EM)

    Preliminary Safety Design Review Module March 2010 CD-0 O 0 OFFICE OF Pr C CD-1 F ENVIRO ... (CD) Ap CD March 2010 L MANAGE n (SRP) y Design e pplicability D-3 EMENT CD-4 Post Ope ...

  6. Preliminary analysis of the state of the art of robotics and precision engineering and evaluation of potential for improved energy utilization in the pulp, paper, and related energy-consuming processes. Final report

    SciTech Connect (OSTI)

    1982-01-01

    This study was undertaken to conduct a preliminary analysis of the state of the art of two technologies, robotics and precision engineering, and to evaluate their potential for improved energy utilization in the pulp, paper, and related energy consuming processes. Activity in the robotics field is growing rapidly, most activity being related to the development of smart robots rather than to systems. There is a broad base of support, both in industry and the universities, for upgrading robot machine capabilities. A large part of that support is associated with visualization and tactile sensors which facilitate assembly, placement, inspection, and tracking. Progress in this area is relatively rapid and development times are short for specifically engineered applications. The critical path in the development of robotic systems lies in the generation of reliable sensor signals. Robotic systems require a broad spectrum of sensors from which hierarchical logic systems can draw decision making information. This requirement resulted in the establishment of a program at the National Bureau of Standards which is attempting to develop a spectrum of sensor capabilities. Such sensors are applicable to robotic system automatic process control in a variety of energy-intensive industries. Precision engineering is defined as the generation or manufacture of components wherein geometry, dimension, and surface finish are controlled to within several hundred Angstroms in single point turning operations. Investigation into the state of the art of precision engineering in the United States finds that this capability exists in several national laboratories and is intended to be used exclusively for the development of weapons. There is an attempt at the present time by Lawrence Livermore Laboratory to expand its capability into industry. Several corporations are now beginning to develop equipment to support the precision engineering field.

  7. Hydrothermal Liquefaction Treatment Preliminary Hazard Analysis Report

    SciTech Connect (OSTI)

    Lowry, Peter P.; Wagner, Katie A.

    2015-08-31

    A preliminary hazard assessment was completed during February 2015 to evaluate the conceptual design of the modular hydrothermal liquefaction treatment system. The hazard assessment was performed in 2 stages. An initial assessment utilizing Hazard Identification and Preliminary Hazards Analysis (PHA) techniques identified areas with significant or unique hazards (process safety-related hazards) that fall outside of the normal operating envelope of PNNL and warranted additional analysis. The subsequent assessment was based on a qualitative What-If analysis. This analysis was augmented, as necessary, by additional quantitative analysis for scenarios involving a release of hazardous material or energy with the potential for affecting the public.

  8. Development of a Novel Gas Pressurized Process-Based Technology for CO2 Capture from Post-Combustion Flue Gases Preliminary Year 1 Techno-Economic Study Results and Methodology for Gas Pressurized Stripping Process

    SciTech Connect (OSTI)

    Chen, Shiaoguo

    2013-03-01

    Under the DOE’s Innovations for Existing Plants (IEP) Program, Carbon Capture Scientific, LLC (CCS) is developing a novel gas pressurized stripping (GPS) process to enable efficient post-combustion carbon capture (PCC) from coal-fired power plants. A technology and economic feasibility study is required as a deliverable in the project Statement of Project Objectives. This study analyzes a fully integrated pulverized coal power plant equipped with GPS technology for PCC, and is carried out, to the maximum extent possible, in accordance to the methodology and data provided in ATTACHMENT 3 – Basis for Technology Feasibility Study of DOE Funding Opportunity Number: DE-FOA-0000403. The DOE/NETL report on “Cost and Performance Baseline for Fossil Energy Plants, Volume 1: Bituminous Coal and Natural Gas to Electricity (Original Issue Date, May 2007), NETL Report No. DOE/NETL-2007/1281, Revision 1, August 2007” was used as the main source of reference to be followed, as per the guidelines of ATTACHMENT 3 of DE-FOA-0000403. The DOE/NETL-2007/1281 study compared the feasibility of various combinations of power plant/CO2 capture process arrangements. The report contained a comprehensive set of design basis and economic evaluation assumptions and criteria, which are used as the main reference points for the purpose of this study. Specifically, Nexant adopted the design and economic evaluation basis from Case 12 of the above-mentioned DOE/NETL report. This case corresponds to a nominal 550 MWe (net), supercritical greenfield PC plant that utilizes an advanced MEAbased absorption system for CO2 capture and compression. For this techno-economic study, CCS’ GPS process replaces the MEA-based CO2 absorption system used in the original case. The objective of this study is to assess the performance of a full-scale GPS-based PCC design that is integrated with a supercritical PC plant similar to Case 12 of the DOE/NETL report, such that it corresponds to a nominal 550 MWe

  9. Preliminary Assessment Template

    Broader source: Energy.gov [DOE]

    Document presents a template for the preliminary assessment (PA) that energy service companies (ESCOs) are required to conduct in an energy savings performance contract (ESPC) project under the U.S.Department of Energy's indefinite-delivery, indefinite-quantity ESPC contract.

  10. AEO2014 Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    September 26, 2013 AEO2014 Preliminary Results For discussion purposes only Not for citation Overview 2 * Residential projects - RECS update - Housing stock formation and decay - Lighting model - ENERGY STAR homes benchmarking - Weather elasticities * Commercial projects - Major end-use capacity factors - Data center servers - ENERGY STAR buildings - Hurdle rate floor * Both sectors - Usual annual updates - Miscellaneous end-use technology assumptions updates - Distributed generation * Contract

  11. Environmental Survey preliminary report

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Sandia National Laboratories conducted August 17 through September 4, 1987. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Sandia National Laboratories-Albuquerque (SNLA). The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SNLA, and interviews with site personnel. 85 refs., 49 figs., 48 tabs.

  12. Preliminary performance of HT datalink

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Cieslewski, Grzegorz

    Preliminary performance of HT HS datalink at room temperature over 5000ft of wireline. The data shows ablility of the datalink to adapt by decreasing speed.

  13. Preliminary performance of HT datalink

    SciTech Connect (OSTI)

    Cieslewski, Grzegorz

    2014-02-11

    Preliminary performance of HT HS datalink at room temperature over 5000ft of wireline. The data shows ablility of the datalink to adapt by decreasing speed.

  14. PRELIMINARY Run Shutdown BL Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

  15. Agenda: Preliminary Assessment Development Teleconference | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Agenda: Preliminary Assessment Development Teleconference Agenda: Preliminary Assessment Development Teleconference Document serves as a standard agenda for the teleconference to discuss the in-progress preliminary assessment. Download the Preliminary Assessment Development Teleconference Agenda. (57.93 KB) More Documents & Publications FEMP ESPC Project Development Resource Guide Agenda: Preliminary Assessment Kickoff Meeting Agenda: Investment-Grade Audit Midpoint Review Meeting

  16. Better Buildings Data and Summary Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data and Summary Report 2014 Building Technologies Office Peer Review Dale Hoffmeyer, ... Key Milestones 1. BBNP Summary of Reported Data 2. BBNP Data Release 3. BBNP Energy ...

  17. Lochinvar Preliminary Plan Comments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lochinvar Preliminary Plan Comments Lochinvar Preliminary Plan Comments Comments to DOE on Certification, Compliance and Enforcement Regulations for Consumer Products and Commercial and Industrial Equipment EO 13563 Preliminary Plan Microsoft Word - Lochinvar Comments -EO 13563 Preliminary Plan.docx (111.29 KB) More Documents & Publications Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Regulatory Burden RFI AHRI Preliminary Plan for Retrospective

  18. Used Fuel Disposition Campaign Preliminary Quality Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to ...

  19. Preliminary Notice of Violation, Sandia Corporation - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Notice of Violation, Sandia Corporation - September 25, 2014 September 25, 2014 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Sandia ...

  20. Preliminary Notice of Violation, Sandia Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Notice of Violation, Sandia Corporation November 17,2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Sandia Corporation On November ...

  1. Agenda: Preliminary Assessment Kickoff Meeting | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Document serves as the standard agenda for the preliminary assessment kickoff meeting. File Download the Preliminary Assessment Kickoff Meeting Agenda. More Documents & ...

  2. EA-1913: Preliminary Environmental Assessment | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Preliminary Environmental Assessment EA-1913: Preliminary Environmental Assessment Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho This EA evaluates the ...

  3. Preliminary Notice of Violation, International Technology Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporation - EA-1999-01 More Documents & Publications Preliminary Notice of Violation, MOTA Corporation - EA-2000-03 Preliminary Notice of Violation, Sandia Corporation -...

  4. Preliminary Notice of Violation, Argonne National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - EA-1999-10 More Documents & Publications Preliminary Notice of Violation, MOTA Corporation - EA-2000-03 Preliminary Notice of Violation, Argonne National...

  5. Preliminary Notice of Violation, Lockheed Martin Idaho Technologies Company, EA-97-09

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Lockheed Martin Idaho Technologies Company related to Work Process Deficiencies at the Test Reactor Area and Idaho Chemical Processing Plant at the Idaho National Engineering and Environmental Laboratory, (EA-97-09)

  6. PRELIMINARY ENVIRONMENTAL, HEALTH AND SAFETY RISK ASSESSMENT ON THE INTEGRATION OF A PROCESS UTILIZING LOW-ENERGY SOLVENTS FOR CARBON DIOXIDE CAPTURE ENABLED BY A COMBINATION OF ENZYMES AND VACUUM REGENERATION WITH A SUBCRITICAL PC POWER PLANT

    SciTech Connect (OSTI)

    Fitzgerald, David; Vidal, Rafael; Russell, Tania; Babcock, Doosan; Freeman, Charles; Bearden, Mark; Whyatt, Greg; Liu, Kun; Frimpong, Reynolds; Lu, Kunlei; Salmon, Sonja; House, Alan; Yarborough, Erin

    2014-12-31

    The results of the preliminary environmental, health and safety (EH&S) risk assessment for an enzyme-activated potassium carbonate (K2CO3) solution post-combustion CO2 capture (PCC) plant, integrated with a subcritical pulverized coal (PC) power plant, are presented. The expected emissions during normal steady-state operation have been estimated utilizing models of the PCC plant developed in AspenTech’s AspenPlus® software, bench scale test results from the University of Kentucky, and industrial experience of emission results from a slipstream PCC plant utilizing amine based solvents. A review of all potential emission species and their sources was undertaken that identified two credible emission sources, the absorber off-gas that is vented to atmosphere via a stack and the waste removed from the PCC plant in the centrifuge used to reclaim enzyme and solvent. The conditions and compositions of the emissions were calculated and the potential EH&S effects were considered as well as legislative compliance requirements. Potential mitigation methods for emissions during normal operation have been proposed and solutions to mitigate uncontrolled releases of species have been considered. The potential emissions were found to pose no significant EH&S concerns and were compliant with the Federal legislation reviewed. The limitations in predicting full scale plant performance from bench scale tests have been noted and further work on a larger scale test unit is recommended to reduce the level of uncertainty.

  7. bbnp_bb_an_0003578_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  8. bbnp_bb_an_0004442_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  9. bbnp_bb_an_0003562_pmc_dashboard_y13-q3_0.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  10. bbnp_bb_an_0003576_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  11. bbnp_bb_an_0003566_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  12. bbnp_bb_an_0003572_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  13. bbnp_bb_an_0003809_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  14. bbnp_bb_an_0003569_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  15. bbnp_bb_an_0003580_pmc_dashboard_y13-q3.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Number Of Tenants Tenancy Assessed Value Down Payment First Trust Deed Balance First Trust Deed Lender First Trust Deed Payment First Trust Deed Terms Second Trust Deed Balance ...

  16. DOEGO85004_1: Final Non-proprietary Technical Report, Generating Process and Economic Data for Preliminary Design of PureVision Biorefineries DOEGO85004_2: One Original Final Proprietary Technical Report to be mailed to DOE Golden.

    SciTech Connect (OSTI)

    Kadam, Kiran L., Ph.D; Lehrburger, Ed

    2008-01-17

    The overall objective of the project was to define a two-stage reactive fractionation process for converting corn stover into a solid cellulose stream and two liquid streams containing mostly hemicellulosic sugars and lignin, respectively. Toward this goal, biomass fractionation was conducted using a small continuous pilot unit with a nominal capacity of 100 pounds per day of dry biomass to generate performance data using primarily corn stover as feedstock. In the course of the program, the PureVision process was optimized for efficient hemicellulose hydrolysis in the first stage employing autohydrolysis and delignification in the second stage using sodium hydroxide as a catalyst. The remaining cellulose was deemed to be an excellent substrate for producing fermentation sugars, requiring 40% less enzymes for hydrolysis than conventional pretreatment systems using dilute acid. The fractionated cellulose was also determined to have potential higher-value applications as a pulp product. The lignin coproduct was determined to be substantially lower in molecular weight (MW) compared to lignins produced in the kraft or sulfite pulping processes. This low-MW lignin can be used as a feed and concrete binder and as an intermediate for producing a range of high-value products including phenolic resins. This research adds to the understanding of the biomass conversion area in that a new process was developed in the true spirit of biorefineries. The work completed successfully demonstrated the technical effectiveness of the process at the pilot level indicating the technology is ready to advance to a 2–3 ton per day scale. No technical showstoppers are anticipated in scaling up the PureVision fractionation process to commercial scale. Also, economic feasibility of using the PureVision process in a commercial-scale biorefinery was investigated and the minimum ethanol selling price for the PureVision process was calculated to be $0.94/gal ethanol vs. $1.07/gal ethanol for the

  17. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  18. Preliminary Notice of Violation, Argonne National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Ohio, Inc - EA-2001-03 Preliminary Notice of Violation, Argonne National Laboratory-East - EA-1999-10 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2001-04...

  19. Preliminary Notice of Violation, National Security Technologies...

    Office of Environmental Management (EM)

    violations of Department of Energy's classified information security program ... Sheet, Preliminary Notice of Violation: Classified Information Security Event at NNSS ...

  20. Hydrogen Infrastructure Market Readiness Workshop: Preliminary...

    Broader source: Energy.gov (indexed) [DOE]

    Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop held ... More Documents & Publications Hydrogen Infrastructure Market Readiness: Opportunities and ...

  1. Business System Planning Project, Preliminary System Design

    SciTech Connect (OSTI)

    EVOSEVICH, S.

    2000-10-30

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

  2. Preliminary analysis of a target factory for laser fusion

    SciTech Connect (OSTI)

    Sherohman, J.W.; Hendricks, C.D.

    1980-06-10

    An analysis of a target factory leading to the determination of production expressions has provided for the basis of a parametric study. Parameters involving the input and output rate of a process system, processing yield factors, and multiple processing steps and production lines have been used to develop an understanding of their dependence on the rate of target injection for laser fusion. Preliminary results have indicated that a parametric study of this type will be important in the selection of processing methods to be used in the final production scheme of a target factory.

  3. AEO2017 Preliminary Macroeconomic Results

    U.S. Energy Information Administration (EIA) Indexed Site

    AEO2017 Preliminary Macroeconomic Results For Macroeconomic Working Group July 28, 2016 | Washington, DC By Vipin Arora, Elizabeth Sendich, and Russ Tarver Macroeconomic Analysis Team Economic growth in major trading partners slows over the projection period while the dollar gradually depreciates Macroeconomic Working Group, Washington DC, July 28, 2016 2 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 1989 1994 1999 2004 2009 2014 2019 2024 2029 2034 2039 real trade-weighted GDP of major trading

  4. Preliminary Notice of Violation,Parsons Infrastructure & Technology Group,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc. - WEA-2010-06 | Department of Energy Parsons Infrastructure & Technology Group, Inc. - WEA-2010-06 Preliminary Notice of Violation,Parsons Infrastructure & Technology Group, Inc. - WEA-2010-06 October 7, 2010 Issued to Parsons Infrastructure & Technology Group, Inc., related to the Hand Injury Event that occurred during Crane Lubrication at the Salt Waste Processing Facility at the Savannah River Site On October 7, 2010, the U.S. Department of Energy (DOE) Office of Health,

  5. Preliminary Energy Savings Impact Evaluation: Better Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program American Recovery and Reinvestment Act of 2009 November 4, 2013 Prepared For: U.S....

  6. Preliminary Notice of Violation, Brookhaven Science Associates...

    Office of Environmental Management (EM)

    Brookhaven Science Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 August 29, 2013 Issued to Brookhaven Science ...

  7. Natural Gas: A Preliminary Summary 1998

    Reports and Publications (EIA)

    1999-01-01

    This special report provides preliminary natural gas data for 1998 which were reported on monthly surveys of the industry through December.

  8. California Gasoline Price Study, 2003 Preliminary Findings

    Reports and Publications (EIA)

    2003-01-01

    This is the preliminary report to Congressman Ose describing the factors driving California's spring 2003 gasoline price spike and the subsequent price increases in June and August.

  9. DOD - Preliminary Screening Tool | Open Energy Information

    Open Energy Info (EERE)

    Screening Tool Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: DOD - Preliminary Screening Tool Abstract This webpage contains the DOD...

  10. Preliminary Notice of Violation, Washington Group International...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to the Advanced Mixed Waste Treatment Project Supercompactor Glovebox Suite at the ... Preliminary Notice of Violation, URS Global Management & Operations Services - NEA-2011-04 ...

  11. Preliminary neutronics assessment of fully ceramic microencapsulated...

    Office of Scientific and Technical Information (OSTI)

    gas-cooled reactors Citation Details In-Document Search Title: Preliminary neutronics assessment of fully ceramic microencapsulated fuel in high-temperature gas-cooled ...

  12. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  13. National Nuclear Security Administration Fact Sheet Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Security Administration Fact Sheet Preliminary Notice of Violation: Worker Safety and Health Program Violations at Los Alamos National Laboratory On June 8, 2016, the ...

  14. Preliminary Notice of Violation, Lawrence Livermore National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Preliminary Notice of Violation, Lawrence Livermore National Laboratory - EA-98-06 July 28, 1998 Issued to the University of California related to Criticality Safety and the...

  15. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report (40.43 KB) More Documents & Publications North American Electric Reliability Council Power Outage Update ...

  16. Preliminary Notice of Violation, Lawrence Livermore National...

    Broader source: Energy.gov (indexed) [DOE]

    Laboratory - EA-2003-04 More Documents & Publications Preliminary Notice of Violation, University of California - EA-2006-01 Type B Accident Investigation Board Report on the...

  17. Natural Gas: A Preliminary Summary 1999

    Reports and Publications (EIA)

    2000-01-01

    This special report provides preliminary natural gas data for 1999 which were reported on monthly surveys of the industry through December.

  18. Preliminary Notice of Violation, Lawrence Livermore National...

    Energy Savers [EERE]

    Lawrence Livermore National Security, LLC - September 25, 2014 Preliminary Notice of Violation, Lawrence Livermore National Security, LLC - September 25, 2014 September 25, 2014 ...

  19. Preliminary Energy Savings Impact Evaluation: Better Buildings...

    Energy Savers [EERE]

    Technical Report (2.51 MB) More Documents & Publications Savings and Economic Impacts of the Better Buildings Neighborhood Program, Final Evaluation Volume 2 Preliminary Energy ...

  20. Preliminary Energy Savings Impact Evaluation: Better Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, 2013. PDF icon Preliminary Energy Savings Impact Evaluation More Documents & Publications Savings and Economic Impacts of the Better Buildings Neighborhood Program, Final ...

  1. Preliminary Assessment Review for Federal ESPCs | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Download the Preliminary Assessment Review. More Documents & Publications Recognizing and Assigning ESPC Risks and Responsibilities Using the Risk, Responsibility, and ...

  2. AHRI Preliminary Plan for Retrospective Analysis | Department...

    Office of Environmental Management (EM)

    Existing Rules Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI A.O. Smith Corporation Response to Preliminary Plan for Retrospective Analysis of

  3. Impact and Process Evaluation of the U.S. Department of Energy...

    Energy Savers [EERE]

    Technical Report (12.14 MB) More Documents & Publications Project Manager's Guide to Managing Impact and Process Evaluation Studies Final Report Appendices: Preliminary Process and ...

  4. Final Report: Preliminary Process and Market Evaluation: Better...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In addition, some communities rely on fuel oil and solid fuel use (wood and pellets), for which there is no way to obtain detailed usage data. In general, however, it appears that ...

  5. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    SciTech Connect (OSTI)

    Peters, Jane S.

    2012-12-28

    This report evaluates the progress of the U.S. Department of Energy’s Better Buildings Neighborhood Program.

  6. February 13, 2013 Webinar: Preliminary Process and Market Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with a goal of identifying what elements of grantee programs are most successful at bringing about market changes that will result in sustainable energy savings Webinar ...

  7. Final Report: Preliminary Process and Market Evaluation: Better...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... described the current depression in the home real estate market as undermining that proposition. 56 savings as their primary motive for seeking the audit and making upgrades. ...

  8. Preliminary Results on Uncertainty Quantification for Pattern Analytics

    SciTech Connect (OSTI)

    Stracuzzi, David John; Brost, Randolph; Chen, Maximillian Gene; Malinas, Rebecca; Peterson, Matthew Gregor; Phillips, Cynthia A.; Robinson, David G.; Woodbridge, Diane

    2015-09-01

    This report summarizes preliminary research into uncertainty quantification for pattern ana- lytics within the context of the Pattern Analytics to Support High-Performance Exploitation and Reasoning (PANTHER) project. The primary focus of PANTHER was to make large quantities of remote sensing data searchable by analysts. The work described in this re- port adds nuance to both the initial data preparation steps and the search process. Search queries are transformed from does the specified pattern exist in the data? to how certain is the system that the returned results match the query? We show example results for both data processing and search, and discuss a number of possible improvements for each.

  9. Mixed-mode diesel HCCI with External Mixture Formation: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mixed-mode diesel HCCI with External Mixture Formation: Preliminary Results Mixed-mode diesel HCCI with External Mixture Formation: Preliminary Results 2003 DEER Conference ...

  10. Preliminary Notice of Violation, Lockheed Martin Energy Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems - EA-2000-11 More Documents & Publications Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2001-04 Preliminary Notice of Violation, Westinghouse Savannah...

  11. EV Everywhere Battery Workshop: Preliminary Target-Setting Framework...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Target-Setting Framework EV Everywhere Battery Workshop: Preliminary Target-Setting Framework Presentation given at the EV Everywhere Grand Challenge: Battery Workshop ...

  12. Preliminary Agenda: October 2008 High Temperature Membrane Working...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting Agenda for October ...

  13. Preliminary Notice of Violation, Babcock and Wilcox Technical...

    Broader source: Energy.gov (indexed) [DOE]

    Security Enforcement Preliminary Notice of Violation issued to Babcock and Wilcox Technical ... More Documents & Publications Preliminary Notice of Violation, Babcock & Wilcox ...

  14. ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND TEMPLATE ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND TEMPLATE Document describes the...

  15. Preliminary Notice of Violation , Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary...

  16. Preliminary Technology Readiness Assessment (TRA) for the Calcine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition ...

  17. Preliminary Benchmarking and MCNP Simulation Results for Homeland...

    Office of Scientific and Technical Information (OSTI)

    Preliminary Benchmarking and MCNP Simulation Results for Homeland Security Citation Details In-Document Search Title: Preliminary Benchmarking and MCNP Simulation Results for ...

  18. Preliminary Analysis of Texas Instrument Hercules Flash-based...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Preliminary Analysis of Texas Instrument Hercules Flash-based Microcontroller Citation Details In-Document Search Title: Preliminary Analysis of Texas Instrument ...

  19. Preliminary heavy ion results on the Zynq ARM (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Preliminary heavy ion results on the Zynq ARM Citation Details In-Document Search Title: Preliminary heavy ion results on the Zynq ARM Authors: Quinn, Heather ...

  20. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results This ...

  1. Clean Energy Technologies: A Preliminary Inventory of the Potential...

    Office of Scientific and Technical Information (OSTI)

    Clean Energy Technologies: A Preliminary Inventory of the Potential for Electricity Generation Citation Details In-Document Search Title: Clean Energy Technologies: A Preliminary ...

  2. Preliminary Notice of Violation, Nuclear Waste Partnership, LLC...

    Office of Environmental Management (EM)

    Nuclear Waste Partnership, LLC Preliminary Notice of Violation, Nuclear Waste Partnership, LLC February 18, 2016 Worker Safety and Health and Nuclear Safety Enforcement Preliminary ...

  3. Preliminary Framework for Human-Automation Collaboration

    SciTech Connect (OSTI)

    Oxstrand, Johanna Helene; Le Blanc, Katya Lee; Spielman, Zachary Alexander

    2015-09-01

    The Department of Energy’s Advanced Reactor Technologies Program sponsors research, development and deployment activities through its Next Generation Nuclear Plant, Advanced Reactor Concepts, and Advanced Small Modular Reactor (aSMR) Programs to promote safety, technical, economical, and environmental advancements of innovative Generation IV nuclear energy technologies. The Human Automation Collaboration (HAC) Research Project is located under the aSMR Program, which identifies developing advanced instrumentation and controls and human-machine interfaces as one of four key research areas. It is expected that the new nuclear power plant designs will employ technology significantly more advanced than the analog systems in the existing reactor fleet as well as utilizing automation to a greater extent. Moving towards more advanced technology and more automation does not necessary imply more efficient and safer operation of the plant. Instead, a number of concerns about how these technologies will affect human performance and the overall safety of the plant need to be addressed. More specifically, it is important to investigate how the operator and the automation work as a team to ensure effective and safe plant operation, also known as the human-automation collaboration (HAC). The focus of the HAC research is to understand how various characteristics of automation (such as its reliability, processes, and modes) effect an operator’s use and awareness of plant conditions. In other words, the research team investigates how to best design the collaboration between the operators and the automated systems in a manner that has the greatest positive impact on overall plant performance and reliability. This report addresses the Department of Energy milestone M4AT-15IN2302054, Complete Preliminary Framework for Human-Automation Collaboration, by discussing the two phased development of a preliminary HAC framework. The framework developed in the first phase was used as the

  4. Hazardous waste cleanup: the preliminaries

    SciTech Connect (OSTI)

    Amos, K.

    1985-08-01

    This article describes the lengthiness and cost of the preliminary steps in a hazardous waste cleanup. The article describes the S-Area lawsuit, an area near Niagara Falls, New York which was an inactive chemical dump. Contaminated sludge was found at a nearby water treatment plant and was traced back to S-Area. In the past five years, S-Area negotiations have cost the U.S. Environmental Protection Agency two million dollars for advice on how work should proceed for the plant and the landfill. This lawsuit was one of the first in the U.S. against a chemical company for endangering the public through unsound waste disposal practices. Negotiation was selected instead of a trial for several reasons which are outlined. S-Area may serve as a model for other such settlements, as it provides for a flexible plan, open to consideration of alternate technologies that may be developed in the future. It contains a phased approach to both defining and evaluating existing problems, then suggesting remedies. It also requires monitoring for at least 35 years or until no danger remains.

  5. NSLS-II Preliminary Design Report

    SciTech Connect (OSTI)

    Dierker, S.

    2007-11-01

    Following the CD0 approval of the National Synchrotron Light Source II (NSLS-II) during August 2005, Brookhaven National Laboratory prepared a conceptual design for a worldclass user facility for scientific research using synchrotron radiation. DOE SC review of the preliminary baseline in December 2006 led to the subsequent CD1 approval (approval of alternative selection and cost range). This report is the documentation of the preliminary design work for the NSLS-II facility. The preliminary design of the Accelerator Systems (Part 1) was developed mostly based of the Conceptual Design Report, except for the Booster design, which was changed from in-storage-ring tunnel configuration to in external- tunnel configuration. The design of beamlines (Part 2) is based on designs developed by engineering firms in accordance with the specification provided by the Project. The conventional facility design (Part 3) is the Title 1 preliminary design by the AE firm that met the NSLS-II requirements. Last and very important, Part 4 documents the ES&H design and considerations related to this preliminary design. The NSLS-II performance goals are motivated by the recognition that major advances in many important technology problems will require scientific breakthroughs in developing new materials with advanced properties. Achieving this will require the development of new tools that will enable the characterization of the atomic and electronic structure, chemical composition, and magnetic properties of materials, at nanoscale resolution. These tools must be nondestructive, to image and characterize buried structures and interfaces, and they must operate in a wide range of temperatures and harsh environments. The NSLS-II facility will provide ultra high brightness and flux and exceptional beam stability. It will also provide advanced insertion devices, optics, detectors, and robotics, and a suite of scientific instruments designed to maximize the scientific output of the facility

  6. Preliminary Economics for Hydrocarbon Fuel Production from Cellulosic Sugars

    SciTech Connect (OSTI)

    Collett, James R.; Meyer, Pimphan A.; Jones, Susanne B.

    2014-05-18

    Biorefinery process and economic models built in CHEMCAD and a preliminary, genome-scale metabolic model for the oleaginous yeast Lipomyces starkeyi were used to simulate the bioconversion of corn stover to lipids, and the upgrading of these hydrocarbon precursors to diesel and jet fuel. The metabolic model was based on the recently released genome sequence for L. starkeyi and on metabolic pathway information from the literature. The process model was based on bioconversion, lipid extraction, and lipid oil upgrading data found in literature, on new laboratory experimental data, and on yield predictions from the preliminary L. starkeyi metabolic model. The current plant gate production cost for a distillate-range hydrocarbon fuel was estimated by the process model Base Case to be $9.5/gallon ($9.0 /gallon of gasoline equivalent) with assumptions of 2011$, 10% internal return on investment, and 2205 ton/day dry feed rate. Opportunities for reducing the cost to below $5.0/gallon, such as improving bioconversion lipid yield and hydrogenation catalyst selectivity, are presented in a Target Case. The process and economic models developed for this work will be updated in 2014 with new experimental data and predictions from a refined metabolic network model for L. starkeyi. Attaining a production cost of $3.0/gallon will require finding higher value uses for lignin other than power generation, such as conversion to additional fuel or to a co-product.

  7. Preliminary Notice of Violation, Lawrence Livermore National...

    Broader source: Energy.gov (indexed) [DOE]

    worker safety and health program (10 C.F.R. Part 851) associated with the sulfuric acid burn event that occurred at Lawrence Livermore National Laboratory. Preliminary Notice of...

  8. Renewable Energy Park - Preliminary Feasibility & Engineering Report

    SciTech Connect (OSTI)

    Ariwite, Roderick

    2015-07-31

    This "Renewable Energy Park - Preliminary Feasibility & Engineering Report" seeks to provide an overall assessment and review of renewable energy development opportunities on the Fallon Indian Reservation and Colony Lands.

  9. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon Preliminary Notice of Violation, EG&G Incorporated - EA-97-10...

  10. Preliminary results from Fermilab E789

    SciTech Connect (OSTI)

    Peng, J.C.; Boissevain, J.; Carey, T.A.; Jansen, D.M.; Jeppesen, R.; Kapustinsky, J.S.; Lane, D.W.; Leitch, M.J.; Lillberg, J.W.; McGaughey, P.L.; Moss, J.M. ); Brown, G.; Isenhower, D.; Sadler, M.; Schnathorst, R.; Schwindt, R. ); Gidal, G.; Ho, P.M.; Kowitt, M.S.I.; Luk, K.B.; Pripstein, D. (Lawrence Berkeley Lab., CA (Unite

    1992-01-01

    Fermilab experiment 789 studies low-multiplicity decays of neutral D and B mesons in a high-rate fixed-target environment. Preliminary results from the 1991 run are presented.

  11. Preliminary results from Fermilab E789

    SciTech Connect (OSTI)

    Peng, J.C.; Boissevain, J.; Carey, T.A.; Jansen, D.M.; Jeppesen, R.; Kapustinsky, J.S.; Lane, D.W.; Leitch, M.J.; Lillberg, J.W.; McGaughey, P.L.; Moss, J.M.; Brown, G.; Isenhower, D.; Sadler, M.; Schnathorst, R.; Schwindt, R.; Gidal, G.; Ho, P.M.; Kowitt, M.S.I.; Luk, K.B.; Pripstein, D.; Lederman, L.M.; Schub, M.H.; Brown, C.N.; Cooper, W.E.; Glass, H.D.; Gounder, K.N.; Mishra, C.S.; Apolinski, M.; Luebke, W.; Kaplan, D.M.; Martin, V.M.; Preston, R.S.; Sa, J.; Tanikella, V.; Childers, R.L.; Darden, C.W.; Snodgrass, D.; Wilson, J.R.; Chen, Y.C.; Kiang, G.C.; Teng, P.K.

    1992-12-01

    Fermilab experiment 789 studies low-multiplicity decays of neutral D and B mesons in a high-rate fixed-target environment. Preliminary results from the 1991 run are presented.

  12. Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results

    Broader source: Energy.gov [DOE]

    Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop held February 16-17, 2011. This presentation was disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop.

  13. National Electric Transmission Congestion Study: Preliminary Findings

    Broader source: Energy.gov [DOE]

    The Department hosted three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the National Electric Transmission Congestion Study. The updated presentation used in the webinars is now available.

  14. Annual Energy Outlook 2014 Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Working Group 2 September 25, 2013 | Washington, DC By Trisha Hutchins and Nicholas Chase Office of Transportation Energy Consumption and Efficiency Analysis Annual Energy Outlook 2014: transportation modeling updates and preliminary results Overview 2 AEO2014 Transportation Working Group 2: Modeling updates and preliminary results Washington, D.C., September 25, 2013 Discussion purposes only - Do not cite or circulate * Macroeconomic drivers - GDP, population, world oil price * Light-duty

  15. Astor Pass Seismic Surveys Preliminary Report (Other) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Other: Astor Pass Seismic Surveys Preliminary Report Citation Details In-Document Search Title: Astor Pass Seismic Surveys Preliminary Report In collaboration with the Pyramid Lake Paiute Tribe (PLPT), the University of Nevada, Reno (UNR) and Optim re-processed, or collected and processed, over 24 miles of 2d seismic-reflection data near the northwest corner of Pyramid Lake, Nevada. The network of 2d land surveys achieved a near-3d density at the Astor Pass geothermal prospect that the PLPT

  16. Preliminary results from the MINERvA experiment

    SciTech Connect (OSTI)

    Harris, Deborah A.; /Fermilab

    2011-11-01

    The MINERvA experiment, operating since 2009 in the NuMI neutrino beam line at Fermilab, has collected neutrino and antineutrino scattering data on a variety of nuclear targets. The detector is designed to identify events originating in plastic scintillator, lead, carbon, iron, water, and liquid helium. The goal of the experiment is to measure inclusive and exclusive cross sections for neutrino and antineutrino with much greater precision than previous experiments. We present preliminary kinematic distributions for charged current quasi-elastic scattering and other processes.

  17. Preliminary Design RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design RM Preliminary Design RM The PD Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the PD prior to CD-2 approval. This PD RM can be applied anytime during the design prior to CD-2 approval. However, in practice, the design is typically review at the 30% design stage, which is corresponding to the end of the PD before initiation of final design. Preliminary Design RM (2.39 MB) More Documents & Publications Final Design

  18. Economic feasibility study: CFR advanced direct coal liquefaction process. Volume 4

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    Preliminary technical and economic data are presented on the CFR Advanced Coal Liquefaction Process. Operating cost estimates and material balances are given.

  19. Preliminary melter performance assessment report

    SciTech Connect (OSTI)

    Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

    1994-08-01

    The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

  20. Preliminary Test Results from 650 MHz Single Cell Medium Beta...

    Office of Scientific and Technical Information (OSTI)

    Preliminary Test Results from 650 MHz Single Cell Medium Beta Cavities for Project X Citation Details In-Document Search Title: Preliminary Test Results from 650 MHz Single Cell ...

  1. Preliminary designs: passive solar manufactured housing. Technical status report

    SciTech Connect (OSTI)

    Not Available

    1980-05-12

    The criteria established to guide the development of the preliminary designs are listed. Three preliminary designs incorporating direct gain and/or sunspace are presented. Costs, drawings, and supporting calculations are included. (MHR)

  2. Property:NEPA PreliminaryEA-EISDate | Open Energy Information

    Open Energy Info (EERE)

    PreliminaryEA-EISDate Jump to: navigation, search Property Name NEPA PreliminaryEA-EISDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  3. Preliminary Results of Bifacial Project Released on the PVPMC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Preliminary Notice of Violation, BWXT Conversion Services, LLC Preliminary Notice of Violation, BWXT Conversion Services, LLC July 13, 2016 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to BWXT Conversion Services, LLC for violations of 10 C.F.R. Part 851 relating to a potassium hydroxide injury event On July 13, 2016, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Preliminary Notice of Violation

  4. Design criteria for Waste Coolant Processing Facility and preliminary proposal 722 for Waste Coolant Processing Facility

    SciTech Connect (OSTI)

    Not Available

    1991-09-27

    This document contains the design criteria to be used by the architect-engineer (A-E) in the performance of Titles 1 and 2 design for the construction of a facility to treat the biodegradable, water soluble, waste machine coolant generated at the Y-12 plant. The purpose of this facility is to reduce the organic loading of coolants prior to final treatment at the proposed West Tank Farm Treatment Facility.

  5. Better Buildings Residential Network Orientation Webinar, Call...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BBNP Grantee Sectors 9 BBNP Accomplishments 10 Better Buildings Residential Network Better Buildings Residential Network: Connects energy efficiency programs and partners to ...

  6. Preliminary plan for treating mixed waste

    SciTech Connect (OSTI)

    Vandegrift, G.F.; Conner, C.; Hutter, J.C.; Leonard, R.A.; Nunez, L.; Sedlet, J.; Wygmans, D.G.

    1993-06-01

    A preliminary waste treatment plan was developed for disposing of radioactive inorganic liquid wastes that contain hazardous metals and/or hazardous acid concentrations at Argonne National Laboratory. This plan, which involves neutralization and sulfide precipitation followed by filtration, reduces the concentration of hazardous metals and the acidity so that the filtrate liquid is simply a low-level radioactive waste that can be fed to a low-level waste evaporator.

  7. Nevada potential repository preliminary transportation strategy Study 2. Volume 1

    SciTech Connect (OSTI)

    1996-02-01

    The objectives of this study were to build on the findings of the Nevada Potential Repository Preliminary Transportation Strategy Study 1 (CRWMS M&O 1995b), and to provide additional information for input to the repository environmental impact statement (EIS) process. In addition, this study supported the future selection of a preferred rail corridor and/or heavy haul route based on defensible data, methods, and analyses. Study research did not consider proposed legislation. Planning was conducted according to the Civilian Radioactive Waste Management Program Plan (DOE 1994a). The specific objectives of Study 2 were to: eliminate or reduce data gaps, inconsistencies, and uncertainties, and strengthen the analysis performed in Study 1; develop a preliminary list of rail route evaluation criteria that could be used to solicit input from stakeholders during scoping meetings. The evaluation criteria will be revised based on comments received during scoping; restrict and refine the width of the four rail corridors identified in Study 1 to five miles or less, based on land use constraints and engineering criteria identified and established in Study 2; evaluate national-level effects of routing spent nuclear fuel and high-level waste to the four identified branch lines, including the effects of routing through or avoiding Las Vegas; continue to gather published land use information and environmental data to support the repository EIS; continue to evaluate heavy haul truck transport over three existing routes as an alternative to rail and provide sufficient information to support the repository EIS process; and evaluate secondary uses for rail (passenger use, repository construction, shared use).

  8. Agricultural and Industrial Process-Heat-Market Sector workbook

    SciTech Connect (OSTI)

    Shulman, M. J.; Kannan, N. P.; deJong, D. L.

    1980-01-01

    This workbook summarizes the preliminary data and assumptions of the Agricultural and Industrial Process Heat Market Sector prepared in conjunction with the development of inputs for a National Plan for the Accelerated Commercialization of Solar Energy.

  9. Preliminary Phase Field Computational Model Development

    SciTech Connect (OSTI)

    Li, Yulan; Hu, Shenyang Y.; Xu, Ke; Suter, Jonathan D.; McCloy, John S.; Johnson, Bradley R.; Ramuhalli, Pradeep

    2014-12-15

    experiments, special experimental methods were devised to create similar boundary conditions in the iron films. Preliminary MFM studies conducted on single and polycrystalline iron films with small sub-areas created with focused ion beam have correlated quite well qualitatively with phase-field simulations. However, phase-field model dimensions are still small relative to experiments thus far. We are in the process of increasing the size of the models and decreasing specimen size so both have identical dimensions. Ongoing research is focused on validation of the phase-field model. Validation is being accomplished through comparison with experimentally obtained MFM images (in progress), and planned measurements of major hysteresis loops and first order reversal curves. Extrapolation of simulation sizes to represent a more stochastic bulk-like system will require sampling of various simulations (i.e., with single non-magnetic defect, single magnetic defect, single grain boundary, single dislocation, etc.) with distributions of input parameters. These outputs can then be compared to laboratory magnetic measurements and ultimately to simulate magnetic Barkhausen noise signals.

  10. ANSI/ASHRAE/IESNA Standard 90.1-2007 Preliminary Qualitative Determination

    SciTech Connect (OSTI)

    Halverson, Mark A.; Liu, Bing; Richman, Eric E.; Winiarski, David W.

    2010-05-25

    A preliminary qualitative analysis of all addenda to ANSI/ASHRAE/IESNA Standard 90.1-2004 that were included in ANSI/ASHRAE/IESNA Standard 90.1-2007 was conducted. All 44 addenda processed by ASHRAE in the creation of Standard 90.1-2007 from Standard 90.1-2004 were evaluated by DOE for their impact on energy efficiency. DOE preliminarily determined whether that addenda would have a positive, neutral, or negative impact on overall building efficiency.

  11. Preliminary engineering design package for the north boundary system improvements interim response action

    SciTech Connect (OSTI)

    1989-08-01

    This interim response action consists of the design and construction of improvements to the North Boundary Containment System. The purpose of this document is to outline the main elements developed in the preliminary design phase of the IRA. The following elements of the IRA are discussed: (1) recharge trenches; (2) well closure; (3) design flow rate; (4) existing ground water treatment process; (5) treatment system modifications; (6) additional carbon storage; (7) Building modifications; and (8) treatment plant operational improvements.

  12. Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program | Department of Energy Energy Savings Impact Evaluation: Better Buildings Neighborhood Program Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, American Recovery and Reinvestment Act of 2009, prepared for the U.S. Department of Energy, November 4, 2013. Preliminary Energy Savings Impact Evaluation (2.51 MB) More Documents & Publications Savings and Economic

  13. Preliminary Notice of Violation, Battelle Energy Alliance, LLC | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Battelle Energy Alliance, LLC Preliminary Notice of Violation, Battelle Energy Alliance, LLC June 20, 2014 Worker Safety and Health Preliminary Notice of Violation issued to Battelle Energy Alliance On June 20, 2014, the U.S. Department of Energy Office of Independent Enterprise Assessments, Office of Enforcement issued a Preliminary Notice of Violation (WEA-2014-01) to Battelle Energy Alliance, LLC (BEA), for the sparger unit testing event that resulted in a BEA researcher

  14. Preliminary Notice of Violation, Lawrence Livermore National Security, LLC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - September 25, 2014 | Department of Energy Lawrence Livermore National Security, LLC - September 25, 2014 Preliminary Notice of Violation, Lawrence Livermore National Security, LLC - September 25, 2014 September 25, 2014 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Lawrence Livermore National Security, LLC On September 25, 2014, the National Nuclear Security Administration issued a Preliminary Notice of Violation (WEA-2014-03) to Lawrence Livermore National

  15. Preliminary Notice of Violation, Los Alamos National Security, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy May 27, 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Los Alamos National Security, LLC On May 27, 2015, the National Nuclear Security Administration issued a Preliminary Notice of Violation (WEA-2015-04) to Los Alamos National Security, LLC for violations of the Department of Energy's worker safety and health program requirements relating to a chlorine release event at the Los Alamos National Laboratory. Preliminary Notice of

  16. Preliminary Notice of Violation, National Security Technologies, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 26, 2014 | Department of Energy LLC - September 26, 2014 Preliminary Notice of Violation, National Security Technologies, LLC - September 26, 2014 September 26, 2014 Security Enforcement Preliminary Notice of Violation issued to National Security Technologies, LLC On September 26, 2014, the National Nuclear Security Administration issued a Preliminary Notice of Violation (SEA-2014-02) to National Security Technologies, LLC (NSTec), for violations of Department of Energy's

  17. Preliminary Notice of Violation, National Security Technologies, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy LLC Preliminary Notice of Violation, National Security Technologies, LLC August 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to National Security Technologies, LLC On August 25, 2015, the National Nuclear Security Administration issued a Preliminary Notice of Violation (WEA-2015-07) to National Security Technologies, LLC, for violations of the Department of Energy's worker safety and health program requirements (10 C.F.R. 851) relating

  18. Preliminary Notice of Violation, Pacific Data Electric, Inc. - February 12,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy Pacific Data Electric, Inc. - February 12, 2015 Preliminary Notice of Violation, Pacific Data Electric, Inc. - February 12, 2015 February 12, 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Pacific Data Electric, Inc. On February 12, 2015, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Preliminary Notice of Violation (WEA-2015-02) to Pacific Data Electric, Inc. (PDE) for

  19. Preliminary Notice of Violation, University of California - February 12,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy University of California - February 12, 2015 Preliminary Notice of Violation, University of California - February 12, 2015 February 12, 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to the University of California. On February 12, 2015, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Preliminary Notice of Violation (WEA-2015-01) to the University of California (UC) for

  20. Notice of Availability of Preliminary Plan for Retrospective Analysis of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Existing Rules | Department of Energy Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Through this notice, the Department of Energy (DOE) announces the availability of its preliminary plan for retrospective analysis of existing rules to make the agency's regulatory program more effective and less burdensome in achieving its regulatory objectives. As part of its implementation

  1. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation Results | Department of Energy Preliminary Evaluation Results Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results This report provides preliminary results from the evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment, early results and agency experience are also provided. 43847.pdf (1.59 MB) More Documents & Publications

  2. NNSA issues Preliminary Notice of Violation to National Security

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies, LLC, for Nuclear Safety Violations, Fact Sheet | Department of Energy NNSA issues Preliminary Notice of Violation to National Security Technologies, LLC, for Nuclear Safety Violations, Fact Sheet NNSA issues Preliminary Notice of Violation to National Security Technologies, LLC, for Nuclear Safety Violations, Fact Sheet On August 22, 2011, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to National Security Technologies, LLC

  3. Preliminary Notice of Violation, Los Alamos National Security, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEA-2010-04 | Department of Energy Security, LLC - WEA-2010-04 Preliminary Notice of Violation, Los Alamos National Security, LLC - WEA-2010-04 October 18, 2010 Preliminary Notice of Violation issued to Los Alamos National Security, LLC related to the Electrical Shock that occurred at Technical Area 16 at the Los Alamos National Laboratory On October 18, 2010, the National Nuclear Security Administration issued a Preliminary Notice of Violation (WEA-2010-04) to Los Alamos National Security,

  4. Preliminary Technology Readiness Assessment (TRA) for the Calcine

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition Project Volume 2 (CDP) | Department of Energy Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) (5.46 MB) Summary - Preliminary TRA of the Calcine Disposition Project (92.33 KB)

  5. ARM SGP and BN AERI Instrument Diagnostic Comparison and Preliminary...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by Bechtel-Nevada (BN). Analysis produced the following preliminary results: (1) sky radiance data collected by both instruments are compatible and consistent and both...

  6. Example USFS Preliminary Section 4(e) Report | Open Energy Information

    Open Energy Info (EERE)

    4(e) Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Personal Communication: Example USFS Preliminary Section 4(e) Report Abstract This letter...

  7. Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary...

    Office of Scientific and Technical Information (OSTI)

    Reactor Physics Assessment Citation Details In-Document Search Title: Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary Reactor Physics Assessment ...

  8. The Pierre Auger Observatory Upgrade - Preliminary Design Report...

    Office of Scientific and Technical Information (OSTI)

    capabilities, with an emphasis on improved mass composition determination using the ... This Preliminary Design Report was produced by the Collaboration in April 2015 as an ...

  9. Preliminary design study of small long life boiling water reactor...

    Office of Scientific and Technical Information (OSTI)

    boiling water reactor (BWR) with tight lattice thorium nitride fuel Citation Details In-Document Search Title: Preliminary design study of small long life boiling water reactor ...

  10. Community Wind Handbook/Understand Preliminary Siting | Open...

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Understand Preliminary Siting Wind turbines operate best in open areas with limited...

  11. Preliminary Notice of Violation, Los Alamos National Security...

    Office of Environmental Management (EM)

    Nuclear Safety Enforcement Preliminary Notice of Violation issued to Los Alamos National Security, LLC for programmatic deficiencies in the nuclear criticality safety program at ...

  12. Preliminary Notice of Violation, Babcock & Wilcox Technical Services...

    Broader source: Energy.gov (indexed) [DOE]

    May 27, 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Babcock & Wilcox Technical Services Y-12, LLC On May 27, 2015, the National Nuclear ...

  13. Notice of Availability of a Preliminary List of Standby Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Testing Guidelines, Federal Register, 66 FR 67517, December 31, 2001 Notice of Availability of a Preliminary List of Standby Power Products and Testing Guidelines, Federal ...

  14. Preliminary Benchmarking and MCNP Simulation Results for Homeland...

    Office of Scientific and Technical Information (OSTI)

    Preliminary Benchmarking and MCNP Simulation Results for Homeland Security Citation ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  15. Lease of Power Privilege Flowchart: Award of Preliminary Lease...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Lease of Power Privilege Flowchart: Award of Preliminary Lease through Award of...

  16. Controls on Fault-Hosted Fluid Flow: Preliminary Results from...

    Open Energy Info (EERE)

    Flow: Preliminary Results from the Coso Geothermal Field, CA Abstract cap rock, permeability, fault, fracture, clay, Coso Authors Davatzes, N.C.; Hickman and S.H. Published...

  17. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites Prepared for U.S. ... Evaluation of Removing Used Nuclear Fuel from Shutdown Sites October 1, 2014 iii ...

  18. EV Everywhere Electric Drive Workshop: Preliminary Target-Setting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework Presentation given at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric ...

  19. PRELIMINARY SURVEY OF AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET...

    Office of Legacy Management (LM)

    . PRELIMINARY SURVEY OF AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK Work ... I . . . .*l-..l- . ..-.-- - - - - .-- AL-TECH SPECIALTY STEEL CORPORATION ...

  20. Preliminary Notice of Violation, URS Global Management & Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    URS Global Management & Operations Services - NEA-2011-04 Preliminary Notice of Violation, URS Global Management & Operations Services - NEA-2011-04 September 1, 2011 Issued to ...

  1. Preliminary design for a maglev development facility

    SciTech Connect (OSTI)

    Coffey, H.T.; He, J.L.; Chang, S.L.; Bouillard, J.X.; Chen, S.S.; Cai, Y.; Hoppie, L.O.; Lottes, S.A.; Rote, D.M. ); Zhang, Z.Y. ); Myers, G.; Cvercko, A. ); Williams, J.R. )

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable of powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.

  2. Preliminary Analysis of Species Partitioning in the DWPF Melter

    SciTech Connect (OSTI)

    Choi, A.; Kesterson, M.; Johnson, F.; McCabe, D.

    2015-07-15

    The work described in this report is preliminary in nature since its goal was to demonstrate the feasibility of estimating the off-gas entrainment rates from the Defense Waste Processing Facility (DWPF) melter based on a simple mass balance using measured feed and glass pour stream compositions and timeaveraged melter operating data over the duration of one canister-filling cycle. The only case considered in this study involved the SB6 pour stream sample taken while Canister #3472 was being filled over a 20-hour period on 12/20/2010, approximately three months after the bubblers were installed. The analytical results for that pour stream sample provided the necessary glass composition data for the mass balance calculations. To estimate the “matching” feed composition, which is not necessarily the same as that of the Melter Feed Tank (MFT) batch being fed at the time of pour stream sampling, a mixing model was developed involving three preceding MFT batches as well as the one being fed at that time based on the assumption of perfect mixing in the glass pool but with an induction period to account for the process delays involved in the calcination/fusion step in the cold cap and the melter turnover.

  3. Safety and Security Enforcement Process Overview | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Preliminary Notice of Violation, Los Alamos National Security, LLC Preliminary Notice of Violation, Sandia Corporation Preliminary Notice of Violation, Brookhaven Science ...

  4. Preliminary upper limit on BR(D{sup {+-}}{r_arrow}{pi}{sup {...

    Office of Scientific and Technical Information (OSTI)

    Preliminary upper limit on BR(Dsup +-rarrowpisup +-musup +musup -) Citation Details In-Document Search Title: Preliminary upper limit on BR(Dsup ...

  5. Laboratory study of corrosion of steam generator tubes: Preliminary results

    SciTech Connect (OSTI)

    Sala, B.; Organista, M.; Henry, K.; Erre, R.; Gelpi, A.; Cattant, F.; Dupin, M.

    1995-12-31

    The secondary side intergranular attack (IGA) and intergranular stress corrosion cracking (IGSCC) of steam generator tubes often occurs in crevices where impurities are concentrated, due to local elevated temperatures and restricted water flow. From the analysis of tubes pulled from plants, it is believed that alumino-silicates deposits and/or organic species may play a role in the development of IGA in near neutral environments. New observations suggest that similar environments and similar processes are operative inside the corroded grain boundaries. A former study using autoclave tests was mainly devoted to the formation of alumino-silicate deposits similar to those observed in plants. The present work pursued the study of local environments responsible for IGA/SC. It confirms former results on the catalytic decomposition of organic species into acetates and presents more details on the mechanism of formation of alumino-silicate deposits on alloy 600, particularly on the role of iron and, to a lesser extent, nickel cations. It was showed that, under the alumino-silicate deposits and in the presence of some organic species, a non-protective chromium rich layer may grow instead of the usual protective spinel oxide. The mechanism responsible for the formation of this layer is believed to involve interaction between iron and, to a lesser extent, nickel with silica and/or possible interaction between chromium and acetates. Preliminary capsule tests indicate that these conditions may induce the initiation of IGA.

  6. Preliminary systems engineering evaluations for the National Ecological Observatory Network.

    SciTech Connect (OSTI)

    Robertson, Perry J.; Kottenstette, Richard Joseph; Crouch, Shannon M.; Brocato, Robert Wesley; Zak, Bernard Daniel; Osborn, Thor D.; Ivey, Mark D.; Gass, Karl Leslie; Heller, Edwin J.; Dishman, James Larry; Schubert, William Kent; Zirzow, Jeffrey A.

    2008-11-01

    The National Ecological Observatory Network (NEON) is an ambitious National Science Foundation sponsored project intended to accumulate and disseminate ecologically informative sensor data from sites among 20 distinct biomes found within the United States and Puerto Rico over a period of at least 30 years. These data are expected to provide valuable insights into the ecological impacts of climate change, land-use change, and invasive species in these various biomes, and thereby provide a scientific foundation for the decisions of future national, regional, and local policy makers. NEON's objectives are of substantial national and international importance, yet they must be achieved with limited resources. Sandia National Laboratories was therefore contracted to examine four areas of significant systems engineering concern; specifically, alternatives to commercial electrical utility power for remote operations, approaches to data acquisition and local data handling, protocols for secure long-distance data transmission, and processes and procedures for the introduction of new instruments and continuous improvement of the sensor network. The results of these preliminary systems engineering evaluations are presented, with a series of recommendations intended to optimize the efficiency and probability of long-term success for the NEON enterprise.

  7. The Department of Energy's Executive Order 13563 Preliminary Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy's Executive Order 13563 Preliminary Plan Submitted on August 1, 2011 On behalf of the Natural Resources Defense Council and our more than 1.3 million members and online activists, we submit the following comments in response to the July 11 th request for comment on the April 29 th , 2011 Draft of the Department of Energy's (DOE) Preliminary Plan for Retrospective Analysis of Existing Rules ("Preliminary Plan"). (76 Federal Register 40646, July 11, 2011) NRDC has

  8. Heavy oil processing utilizing the dynacracking process. Final report

    SciTech Connect (OSTI)

    Parthasarathy, R.

    1983-01-01

    This report covers preliminary design of a heavy oil conversion unit based on HRI's Dynacracking Process. The unit is designed for operation in any of the six cases described in this report. The six cases presented demonstrate the versatility of the unit to process three different feedstocks with different product objectives and at various process conditions while keeping the reactor configuration and design fixed. The reactor incorporated in the design is identical to the one proposed for a plant to be built in Pittsburg, CA., with California Synfuels Research Corporation as the operator. An evaluative study is presented of the product qualities and possible alternatives for product utilization and upgrading. An indicative summary is made of the quality of effluents from the unit. Estimated utilities and operating requirements are presented. Overall plant material balances are included for each of the six cases. Process equipment duty specifications and offsite tankage requirements are provided and a preliminary cost estimate presented. Basic operating principles (outside the reactor) for smooth plant operation are included. Suggestions plants arrangement and layout are provided. 18 tables.

  9. Thick Concrete Specimen Construction, Testing, and Preliminary Analysis

    SciTech Connect (OSTI)

    Clayton, Dwight A.; Hoegh, Kyle; Khazanovich, Lev

    2015-03-01

    initial results are also presented along with a discussion of the preliminary findings. Comparative NDE of various defects in reinforced concrete specimens is a key component in identifying the most promising techniques and directing the research and development efforts needed to characterize concrete degradation in commercial NPPs. This requires access to the specimens for data collection using state-of-the-art technology. The construction of the specimen detailed in this report allows for an evaluation of how different NDE techniques may interact with the size and complexities of NPP concrete structures. These factors were taken into account when determining specimen size and features to ensure a realistic design. The lateral dimensions of the specimen were also chosen to mitigate unrealistic boundary effects that would not affect the results of field NPP concrete testing. Preliminary results show that, while the current methods are able to identify some of the deeper defects, improvements in data processing or hardware are necessary to be able to achieve the precision and reliability achieved in evaluating thinner and less heavily reinforced concrete structures.

  10. Guidance for performing preliminary assessments under CERCLA

    SciTech Connect (OSTI)

    1991-09-01

    EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

  11. Preliminary results from an advanced lighting controlstestbed

    SciTech Connect (OSTI)

    Avery, Douglas; Jennings, Judity; Rubinstein, Francis

    1998-03-01

    Preliminary results from a large-scale testbed of advanced lighting control technologies at the Phillip Burton Federal Building at 450 Golden Gate Ave. in San Francisco are presented. The first year objective of this project is to determine the sustainable energy savings and cost-effectiveness of different lighting control technologies compared to a portion of the building where only minimal controls are installed. The paper presents the analyzed results from six months of tests focused on accurately characterizing the energy savings potential of one type of daylight-linked lighting controls compared to the lighting in similar open-planned areas without dimming controls. After analyzing a half year;s data, we determined that the annual energy savings for this type of daylight- linked controls was 41% and 30% for the outer rows of lights on the South and North sides of the building, respectively. The annual energy savings dropped to 22% and 16% for the second row of lights for the South and North, respectively, and was negligible for the third rows of lights.

  12. ANSI/ASHRAE/IESNA Standard 90.1-2010 Preliminary Determination Quantitative Analysis

    SciTech Connect (OSTI)

    Halverson, Mark A.; Liu, Bing; Rosenberg, Michael I.

    2010-11-01

    The United States (U.S.) Department of Energy (DOE) conducted a preliminary quantitative analysis to assess whether buildings constructed according to the requirements of the American National Standards Institute (ANSI)/American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)/Illuminating Engineering Society of North America (IESNA) Standard 90.1-2010 (ASHRAE Standard 90.1-2010, Standard 90.1-2010, or 2010 edition) would result in energy savings compared with buildings constructed to ANSI/ASHRAE/IESNA Standard 90.1-2007(ASHRAE Standard 90.1-2007, Standard 90.1-2007, or 2007 edition). The preliminary analysis considered each of the 109 addenda to ASHRAE Standard 90.1-2007 that were included in ASHRAE Standard 90.1-2010. All 109 addenda processed by ASHRAE in the creation of Standard 90.1-2010 from Standard 90.1-2007 were reviewed by DOE, and their combined impact on a suite of 16 building prototype models in 15 ASHRAE climate zones was considered. Most addenda were deemed to have little quantifiable impact on building efficiency for the purpose of DOE’s preliminary determination. However, out of the 109 addenda, 34 were preliminarily determined to have measureable and quantifiable impact.

  13. Advanced System for Process Engineering

    Energy Science and Technology Software Center (OSTI)

    1992-02-01

    ASPEN (Advanced System for Process Engineering) is a state of the art process simulator and economic evaluation package which was designed for use in engineering fossil energy conversion processes. ASPEN can represent multiphase streams including solids, and handle complex substances such as coal. The system can perform steady state material and energy balances, determine equipment size and cost, and carry out preliminary economic evaluations. It is supported by a comprehensive physical property system for computationmore » of major properties such as enthalpy, entropy, free energy, molar volume, equilibrium ratio, fugacity coefficient, viscosity, thermal conductivity, and diffusion coefficient for specified phase conditions; vapor, liquid, or solid. The properties may be computed for pure components, mixtures, or components in a mixture, as appropriate. The ASPEN Input Language is oriented towards process engineers.« less

  14. Preliminary Notice of Violation, Los Alamos National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - WEA-2012-03 Preliminary Notice of Violation, Los Alamos National Security, LLC - WEA-2012-03 October 17, 2012 Issued to Los Alamos National Security, LLC, related to Four ...

  15. Preliminary Notice of Violation, Fluor Daniel Fernald Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fernald Corporation - EA-97-05 Preliminary Notice of Violation, Fluor Daniel Fernald Corporation - EA-97-05 July 29, 1997 Issued to Fluor Daniel Fernald Corporation related to...

  16. Crystallization and preliminary X-ray crystallographic studies...

    Office of Scientific and Technical Information (OSTI)

    X-ray crystallographic studies of Drep-3, a DFF-related protein from Drosophila melanogaster Citation Details In-Document Search Title: Crystallization and preliminary X-ray ...

  17. Preliminary Notice of Violation, Babcock & Wilcox Technical Services...

    Office of Environmental Management (EM)

    Babcock & Wilcox Technical Services Y-12, LLC - NEA-2008-01 Preliminary Notice of Violation, Babcock & Wilcox Technical Services Y-12, LLC - NEA-2008-01 June 13, 2008 Issued to ...

  18. Fact Sheet Preliminary Notice of Violation: Classified Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Y-12 On January 28, 2016, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Babcock and Wilcox Technical Services Y-12, LLC (B&...

  19. Preliminary Site Assessment Of The Redfield Campus, Reno, Nevada...

    Open Energy Info (EERE)

    Site Assessment Of The Redfield Campus, Reno, Nevada, Usa Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Preliminary Site Assessment Of The...

  20. Spent nuclear fuel project path forward preliminary safety evaluation

    SciTech Connect (OSTI)

    Brehm, J.R.; Crowe, R.D.; Siemer, J.M.; Wojdac, L.F.; Hosler, A.G.

    1995-03-01

    This preliminary safety evaluation (PSE) provides validation of the initial project design criteria for the Spent Nuclear Fuel Project (SNFP) Path Forward for removal of fuel from K Basins.

  1. Preliminary Notice of Violation, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in responding to a high level alarm for a criticality safe slab tank in a laboratory vacuum system at the Pacific Northwest National Laboratory. PDF icon Preliminary Notice of...

  2. Preliminary Notice of Violation, SLAC National Accelerator Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Enforcement issued a Preliminary Notice of Violation (WEA-2009-01) to Stanford University for violations of 10 C.F.R. 851 associated with a polyvinyl chloride pipe ...

  3. Preliminary Notice of Violation, Safety and Ecology Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecology Corporation related to a 10 CFR Part 708 Violation at the Portsmouth Gaseous Diffusion Project On June 14, 2005, the U.S. Department of Energy issued a Preliminary Notice...

  4. Preliminary/Sample Residential EE Loan Term Sheet and Underwriting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Clean Energy Finance Guide, 3rd Edition) PreliminarySample Residential EE Loan Term Sheet and Underwriting Criteria (Appendix A of the Clean Energy Finance Guide, 3rd ...

  5. Preliminary Agenda Available for 2016 National Cleanup Workshop

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – The preliminary agenda is now available for the 2016 National Cleanup Workshop, set to be held on Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va.

  6. CRAD, Preliminary Documented Safety Analysis - July 25, 2014...

    Broader source: Energy.gov (indexed) [DOE]

    4 Preliminary Documented Safety Analysis (IEA CRAD 31-2, REV. 0) This Criteria Review and Approach Document (IEA CRAD 31-2, REV. 0) provides objectives, criteria, and approaches...

  7. Preliminary Notice of Violation, BWXT Conversion Services, LLC

    Broader source: Energy.gov [DOE]

    Worker Safety and Health Enforcement Preliminary Notice of Violation issued to BWXT Conversion Services, LLC for violations of 10 C.F.R. Part 851 relating to a potassium hydroxide injury event

  8. Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to determine whether the existing Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is sufficient for work to be performed in the Used Fuel Disposition Campaign (UFDC), and where the existing QAPD is not sufficient, supply recommendations for changes to the QAPD to

  9. Preliminary Notice of Violation, Brookhaven Science Associates, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEA-2013-01 | Department of Energy Brookhaven Science Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 August 29, 2013 Issued to Brookhaven Science Associates, LLC, related to a Fall Injury Event that occurred in Building 701 at the Brookhaven National Laboratory On August 29, 2013, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight issued a Preliminary Notice of

  10. Preliminary Notice of Violation, Los Alamos National Security, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy February 18, 2016 Nuclear Safety Enforcement Preliminary Notice of Violation issued to Los Alamos National Security, LLC relating to the packaging and remediation of transuranic waste drums at the Los Alamos National Laboratory On February 18, 2016, the National Nuclear Security Administration issued a Preliminary Notice of Violation (NEA-2016-01) to Los Alamos National Security, LLC for violations of 10 C.F.R. Part 830 associated with the packaging and remediation of

  11. Electric System Decision Making in Other Regions: A Preliminary Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation | Department of Energy System Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation Electric System Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation The nation's electricity system is regional in nature,

  12. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and

  13. Annual Energy Outlook 2016 Renewables Working Group Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewables Working Group Preliminary Results Renewables AEO2016 Working Group February 9, 2016| Washington, DC By EIA, Renewable Electricity Analysis Team WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview 2 Renewable Electricity Analysis Team February 9, 2016 * Key policy provisions * Update on CPP model representation * Update on status of Leidos capital cost study * Preliminary results WORKING GROUP PRESENTATION FOR DISCUSSION

  14. Annual Energy Outlook 2016: Electricity Sector Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Electricity Sector Preliminary Results For Electricity AEO2016 Working Group February 10, 2016| Washington, DC By EIA, Office of Electricity, Coal, Nuclear & Renewables Analysis WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Summary 2 Electricity Analysis Team February 10, 2016 * Address issues raised by stakeholders * Discuss recent developments- updates to generator status and capital costs * Present preliminary AEO2016 forecast

  15. Preliminary characterization of active MEMS valves. (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Preliminary characterization of active MEMS valves. Citation Details In-Document Search Title: Preliminary characterization of active MEMS valves. Partial characterization of a series of electrostatically actuated active microfluidic valves is to be performed. Tests are performed on a series of 24 valves from two different MEMS sets. Focus is on the physical deformation of the structures under variable pressure loadings, as well as voltage levels. Other issues that inhibit

  16. Preliminary Neutronics Analysis of the ITER Toroidal Interferometer and

    Office of Scientific and Technical Information (OSTI)

    Polarimeter Diagnostic Corner Cube Retroreflectors (Journal Article) | SciTech Connect Preliminary Neutronics Analysis of the ITER Toroidal Interferometer and Polarimeter Diagnostic Corner Cube Retroreflectors Citation Details In-Document Search Title: Preliminary Neutronics Analysis of the ITER Toroidal Interferometer and Polarimeter Diagnostic Corner Cube Retroreflectors ITER is an international project under construction in France that will demonstrate nuclear fusion at a power

  17. Preliminary Results of Investigating Precompound Emission of Light

    Office of Scientific and Technical Information (OSTI)

    Fragments in Spallation Reactions, Summer 2012 (Technical Report) | SciTech Connect Preliminary Results of Investigating Precompound Emission of Light Fragments in Spallation Reactions, Summer 2012 Citation Details In-Document Search Title: Preliminary Results of Investigating Precompound Emission of Light Fragments in Spallation Reactions, Summer 2012 Authors: Kerby, Leslie M. [1] ; Mashnik, Stepan G. [1] ; Sierk, Arnold John [1] + Show Author Affiliations Los Alamos National Laboratory

  18. Preliminary Study of Microfluidic Chip as Sample Containment for

    Office of Scientific and Technical Information (OSTI)

    Quantitative hiRX Measurements (Technical Report) | SciTech Connect Preliminary Study of Microfluidic Chip as Sample Containment for Quantitative hiRX Measurements Citation Details In-Document Search Title: Preliminary Study of Microfluidic Chip as Sample Containment for Quantitative hiRX Measurements Authors: Havrilla, George J. [1] + Show Author Affiliations Los Alamos National Laboratory Publication Date: 2013-07-23 OSTI Identifier: 1088907 Report Number(s): LA-UR-13-25734 DOE Contract

  19. Preliminary Agenda: October 2008 High Temperature Membrane Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting | Department of Energy Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting Preliminary Agenda: October 2008 High Temperature Membrane Working Group Meeting Agenda for October 2008 High Temperature Membrane Working Group Meeting in Honolulu, Hawaii. htmwg_agenda_meeting_1008.pdf (27.08 KB) More Documents & Publications Minutes of the October 2008 Meeting of the High Temperature Membrane Working Group Agenda for the High Temperature Membrane Working

  20. Preliminary Notice of Violation, National Security Technologies, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEA-2011-03 | Department of Energy National Security Technologies, LLC - NEA-2011-03 Preliminary Notice of Violation, National Security Technologies, LLC - NEA-2011-03 August 11, 2011 Issued to National Security Technologies, LLC related to Deficiencies in Inspection and Installation of Penetration Fire Seals and Other Components at the Nevada National Security Site On August 11, 2011, the National Nuclear Security Administration issued a Preliminary Notice of Violation (NEA-2011-03) to

  1. DOE Preliminary Plan for Retrospective Analysis of Existing Rules |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Preliminary Plan for Retrospective Analysis of Existing Rules DOE Preliminary Plan for Retrospective Analysis of Existing Rules On January 18, 2011, the President issued Executive Order 13563, "Improving Regulation and Regulatory Review," to ensure that Federal regulations seek more affordable, less intrusive means to achieve policy goals, and that agencies give careful consideration to the benefits and costs of those regulations. Executive Order 13563

  2. 2014 Energy Storage Peer Review - Preliminary Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Storage Peer Review - Preliminary Agenda 2014 Energy Storage Peer Review - Preliminary Agenda The 2014 Energy Storage Peer Review will be held September 19-19, 2014, in Washington, DC. The event is free but registration is required by Friday, September 5, 2014. This year's review will include the latest innovations across all spectrums of energy storage, spanning materials research all the way to the safe deployment of systems. OE's Dr. Imre Gyuk will be an opening speaker, providing the

  3. Preliminary Notice of Violation, Babcock and Wilcox Technical Services Y-12, LLC

    Office of Energy Efficiency and Renewable Energy (EERE)

    Security Enforcement Preliminary Notice of Violation issued to Babcock and Wilcox Technical Services Y-12, LLC

  4. Methodology for Preliminary Design of Electrical Microgrids

    SciTech Connect (OSTI)

    Jensen, Richard P.; Stamp, Jason E.; Eddy, John P.; Henry, Jordan M; Munoz-Ramos, Karina; Abdallah, Tarek

    2015-09-30

    Many critical loads rely on simple backup generation to provide electricity in the event of a power outage. An Energy Surety Microgrid TM can protect against outages caused by single generator failures to improve reliability. An ESM will also provide a host of other benefits, including integration of renewable energy, fuel optimization, and maximizing the value of energy storage. The ESM concept includes a categorization for microgrid value proposi- tions, and quantifies how the investment can be justified during either grid-connected or utility outage conditions. In contrast with many approaches, the ESM approach explic- itly sets requirements based on unlikely extreme conditions, including the need to protect against determined cyber adversaries. During the United States (US) Department of Defense (DOD)/Department of Energy (DOE) Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) effort, the ESM methodology was successfully used to develop the preliminary designs, which direct supported the contracting, construction, and testing for three military bases. Acknowledgements Sandia National Laboratories and the SPIDERS technical team would like to acknowledge the following for help in the project: * Mike Hightower, who has been the key driving force for Energy Surety Microgrids * Juan Torres and Abbas Akhil, who developed the concept of microgrids for military installations * Merrill Smith, U.S. Department of Energy SPIDERS Program Manager * Ross Roley and Rich Trundy from U.S. Pacific Command * Bill Waugaman and Bill Beary from U.S. Northern Command * Melanie Johnson and Harold Sanborn of the U.S. Army Corps of Engineers Construc- tion Engineering Research Laboratory * Experts from the National Renewable Energy Laboratory, Idaho National Laboratory, Oak Ridge National Laboratory, and Pacific Northwest National Laboratory

  5. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  6. S-CHA-H-00026 Rev. A PRELIMINARY SCOPING-LEVEL HAZARD ANALYSIS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S-CHA-H-00026 Rev. A PRELIMINARY SCOPING-LEVEL HAZARD ANALYSIS FOR THE PROCESSING OF HGTR PEBBLE FUEL AT SRS January 2015 OFFICIAL USE ONLY May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552), exemption number 4 and category Commercial/Proprietary Department of Energy review required before public release. Name/Org:_C. M. Hadden, Dep Mgr H N&CSE Date: 2/4/2015 Guidance (if applicable):___n/a___ S-CHA-H-00026 Rev. A ii DISCLAIMER This document was prepared by

  7. Spinel dissolution via addition of glass forming chemicals. Results of preliminary experiments

    SciTech Connect (OSTI)

    Fox, K. M.; Johnson, F. C.

    2015-11-01

    Increased loading of high level waste in glass can lead to crystallization within the glass. Some crystalline species, such as spinel, have no practical impact on the chemical durability of the glass, and therefore may be acceptable from both a processing and a product performance standpoint. In order to operate a melter with a controlled amount of crystallization, options must be developed for remediating an unacceptable accumulation of crystals. This report describes preliminary experiments designed to evaluate the ability to dissolve spinel crystals in simulated waste glass melts via the addition of glass forming chemicals (GFCs).

  8. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    SciTech Connect (OSTI)

    Connell, Daniel P

    2009-01-12

    commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  9. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    SciTech Connect (OSTI)

    Liekhus, K.; Grandy, J.; Chambers, A.

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools.

  10. Preliminary examination of oil bonding at sand surfaces and its influence on hot water separation

    SciTech Connect (OSTI)

    Hupka, J.; Budzich, M.; Miller, J.D.

    1991-01-01

    The efficiency of water-based separation of oil from sand particles is dependent on the nature of the oil-sand association and a preliminary examination of this bonding has been completed. The degree of hydration of the sand surface at the time of contact with oil was related to the subsequent efficiency of the oil-sand separation process. Variables which influence hot water separation were correlated by multiple linear regression, and a second order experimental model was obtained. The processing temperature appeared to be the most significant variable, followed by digestion time and pH. Oil-coated sand particles which had intrinsic water left on their surface during sample preparation were easily processed in hot water separation experiments, and 64 to 90% of the oil was removed. On the other hand, only 1 to 23% separation and oil recovery was possible when a calcinated sand-oil mixture was used.