Sample records for basis survey managers

  1. Radioactive Waste Management Basis

    SciTech Connect (OSTI)

    Perkins, B K

    2009-06-03T23:59:59.000Z

    The purpose of this Radioactive Waste Management Basis is to describe the systematic approach for planning, executing, and evaluating the management of radioactive waste at LLNL. The implementation of this document will ensure that waste management activities at LLNL are conducted in compliance with the requirements of DOE Order 435.1, Radioactive Waste Management, and the Implementation Guide for DOE Manual 435.1-1, Radioactive Waste Management Manual. Technical justification is provided where methods for meeting the requirements of DOE Order 435.1 deviate from the DOE Manual 435.1-1 and Implementation Guide.

  2. Knowing and Managing Grain Basis

    E-Print Network [OSTI]

    Amosson, Stephen H.; Mintert, James R.; Tierney Jr., William I.; Waller, Mark L.

    1999-06-23T23:59:59.000Z

    Knowing and Managing Grain Basis Stephen Amosson, Jim Mintert, William Tierney and Mark Waller* Differences in grain prices throughout the world are the result of surplus or deficit production in various regions. In general, grain prices are lower... in the inland producing regions and higher in grain-deficit, densely populated and port regions. Distances between producing and consuming regions explain the price differential. Transfer costs, which include loading or handling and transportation charges...

  3. Integrated Safety Management System as the Basis for Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development Integrated Safety Management System as the Basis for Work Planning and...

  4. Radioactive Waste Management BasisSept 2001

    SciTech Connect (OSTI)

    Goodwin, S S

    2011-08-31T23:59:59.000Z

    This Radioactive Waste Management Basis (RWMB) documents radioactive waste management practices adopted at Lawrence Livermore National Laboratory (LLNL) pursuant to Department of Energy (DOE) Order 435.1, Radioactive Waste Management. The purpose of this RWMB is to describe the systematic approach for planning, executing, and evaluating the management of radioactive waste at LLNL. The implementation of this document will ensure that waste management activities at LLNL are conducted in compliance with the requirements of DOE Order 435.1, Radioactive Waste Management, and the Implementation Guide for DOE manual 435.1-1, Radioactive Waste Management Manual. Technical justification is provided where methods for meeeting the requirements of DOE Order 435.1 deviate from the DOE Manual 435.1-1 and Implementation Guide.

  5. Identity and Access Management: Access Management Survey 1 Access Management Survey Questions

    E-Print Network [OSTI]

    Maroncelli, Mark

    Identity and Access Management: Access Management Survey 1 Access Management Survey Questions has developed a survey to solicit your input for Access Management. Please take a moment to complete be submitted by Friday May 14, 2010. #12;Identity and Access Management: Access Management Survey 2 Group

  6. SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning

    E-Print Network [OSTI]

    Squire, Larry R.

    SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help is subject to change without notice. #12;Morehead Associates Page 2 of 115 Manager's Guide to Survey Feedback;Morehead Associates Page 3 of 115 Manager's Guide to Survey Feedback and Action Planning Action Planning

  7. Survey Research Methodology in Management Information Systems: An Assessment

    E-Print Network [OSTI]

    Pinsonneault, Alain; Kraemer, Kenneth L.

    1993-01-01T23:59:59.000Z

    Management. 181-186. A survey. Management the impact onskill requirements: A survey. Management Information SystemsManagement Information Systems Research Challenge: Survey

  8. Nuclear Safety Basis Program Review Overview and Management Oversight...

    Broader source: Energy.gov (indexed) [DOE]

    This SRP, Nuclear Safety Basis Program Review, consists of five volumes. It provides information to help strengthen the technical rigor of line management oversight and federal...

  9. Business Process Management: A Comprehensive Survey

    E-Print Network [OSTI]

    Aalst, W.M.P.van der

    Business Process Management: A Comprehensive Survey Wil M.P. van der Aalst Department. Business Process Management (BPM) research resulted in a plethora of methods, techniques, and tools to support the design, enactment, management, and analysis of operational business processes. This survey

  10. Formal Management Review of the Safety Basis Calculations Noncompliance

    SciTech Connect (OSTI)

    Altenbach, T J

    2008-06-24T23:59:59.000Z

    In Reference 1, LLNL identified a failure to adequately implement an institutional commitment concerning administrative requirements governing the documentation of Safety Basis calculations supporting the Documented Safety Analysis (DSA) process for LLNL Hazard Category 2 and Category 3 nuclear facilities. The AB Section has discovered that the administrative requirements of AB procedure AB-006, 'Safety Basis Calculation Procedure for Category 2 and 3 Nuclear Facilities', have not been uniformly or consistently applied in the preparation of Safety Basis calculations for LLNL Hazard Category 2 and 3 Nuclear Facilities. The SEP Associated Director has directed the AB Section to initiate a formal management review of the issue that includes, but is not necessarily limited to the following topics: (1) the basis establishing Ab-006 as a required internal procedure for Safety Basis calculations; (2) how requirements for Safety Basis calculations flow down in the institutional DSA process; (3) the extent to which affected Laboratory organizations have explicitly complied with the requirements of Procedure AB-006; (4) what alternative approaches LLNL organizations has used for Safety Basis calculations and how these alternate approaches compare with Procedure AB-006 requirements; and (5) how to reconcile Safety Basis calculations that were performed before Procedure AB-006 came into existence (i.e., August 2001). The management review2 also includes an extent-of-condition evaluation to determine how widespread the discovered issue is throughout Laboratory organizations responsible for operating nuclear facilities, and to determine if implementation of AB procedures other than AB-006 has been similarly affected. In Reference 2, Corrective Action 1 was established whereby the SEP Directorate will develop a plan for performing a formal management review of the discovered condition, including an extent-of condition evaluation. In Reference 3, a plan was provided to prepare a formal management review, satisfying Corrective Action 1. An AB-006 Working Group was formed,led by the AB Section, with representatives from the Nuclear Materials Technology Program (NMTP), the Radioactive and Hazardous Waste Management (RHWM) Division, and the Packaging and Transportation Safety (PATS) Program. The key action of this management review was for Working Group members to conduct an assessment of all safety basis calculations referenced in their respective DSAs. Those assessments were tasked to provide the following information: (1) list which safety basis calculations correctly follow AB-006 and therefore require no additional documentation; (2) identify and list which safety basis calculations do not strictly follow AB-006, these include NMTP Engineering Notes, Engineering Safety Notes, and calculations by organizations external to the nuclear facilities (such as Plant Engineering), subcontractor calculations, and other internally generated calculations. Each of these will be reviewed and listed on a memorandum with the facility manager's (or designee's) signature accepting that calculation for use in the DSA. If any of these calculations are lacking the signature of a technical reviewer, they must also be reviewed for technical content and that review documented per AB-006.

  11. Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla

    E-Print Network [OSTI]

    Browne, James C.

    Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla University of Texas describes a taxonomy for classifying resource management architectures and presents the survey of resource of grid resource management systems; section 4 presents the survey of resource management in popular grid

  12. Interest Management in Distributed Simulation: A Survey* Bora I. Kumova

    E-Print Network [OSTI]

    Kumova, Bora

    Interest Management in Distributed Simulation: A Survey* Bora I. Kumova Dokuz Eylul University Management; Distributed Simulation Abstract Current interest management implementations can reduce the data clustering. Furthermore, a new taxonomy for interest management that includes these concepts is introduced

  13. Survey of Critical Wetlands Bureau of Land Management Lands

    E-Print Network [OSTI]

    Survey of Critical Wetlands Bureau of Land Management Lands South Park, Park County, Colorado 2003 Delivery Colorado State University #12;Survey of Critical Wetlands Bureau of Land Management Lands South

  14. Student Survey Management Group The Student Survey Management Group, which reports to the Learning and Teaching Board via the Student Learning

    E-Print Network [OSTI]

    Greenaway, Alan

    Student Survey Management Group The Student Survey Management Group, which reports to the Learning are appropriately timed and "survey fatigue" is minimised. Key Student Surveys The Student Survey Management Group manages five student surveys key to HWU: Student Survey Framework and Process In June 2014, the Learning

  15. BIOSPHERE RESERVES MANAGER'S SURVEY In preparation for the October 1995 Biosphere Reserves Managers'

    E-Print Network [OSTI]

    BIOSPHERE RESERVES MANAGER'S SURVEY In preparation for the October 1995 Biosphere Reserves Managers' Workshop, William Gregg of the National Biological Service, surveyed the managers' perceptions about as important. For additional information on the Biosphere Reserves Managers' Survey please contact: Dr. William

  16. The Dark Energy Survey Data Management System

    E-Print Network [OSTI]

    Joseph J. Mohr; Wayne Barkhouse; Cristina Beldica; Emmanuel Bertin; Y. Dora Cai; Luiz da Costa; J. Anthony Darnell; Gregory E. Daues; Michael Jarvis; Michelle Gower; Huan Lin; leandro Martelli; Eric Neilsen; Chow-Choong Ngeow; Ricardo Ogando; Alex Parga; Erin Sheldon; Douglas Tucker; Nikolay Kuropatkin; Chris Stoughton

    2008-07-16T23:59:59.000Z

    The Dark Energy Survey collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at NCSA and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used Teragrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  17. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Mohr, Joseph J.; /Illinois U., Urbana, Astron. Dept. /Illinois U., Urbana; Barkhouse, Wayne; /North Dakota U.; Beldica, Cristina; /Illinois U., Urbana; Bertin, Emmanuel; /Paris, Inst. Astrophys.; Dora Cai, Y.; /NCSA, Urbana; Nicolaci da Costa, Luiz A.; /Rio de Janeiro Observ.; Darnell, J.Anthony; /Illinois U., Urbana, Astron. Dept.; Daues, Gregory E.; /NCSA, Urbana; Jarvis, Michael; /Pennsylvania U.; Gower, Michelle; /NCSA, Urbana; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

    2008-07-01T23:59:59.000Z

    The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  18. Survey Questionnaire on Environmental Management Practices: Summary of Results by Industry and practices

    E-Print Network [OSTI]

    Delmas, Magali A; Toffel, Michael W.

    2008-01-01T23:59:59.000Z

    results of a survey on Environmental Management Practices (SURVEY QUESTIONNAIRE ON ENVIRONMENTAL MANAGEMENT PRACTICESmanagement consultants to complete the draft survey, and

  19. When to stop managing or surveying cryptic threatened species

    E-Print Network [OSTI]

    Burgman, Mark

    When to stop managing or surveying cryptic threatened species Iadine Chade`s* , Eve Mc soon, failing to invest in sufficient surveying to be sufficiently sure further management increasingly difficult to detect as their populations decline. Managers of such cryptic threatened species face

  20. An Integrated Pest Management survey of Texas school districts

    E-Print Network [OSTI]

    Shodrock, Damon Leon

    1994-01-01T23:59:59.000Z

    Texas school district personnel were surveyed using a mailed questionnaire to determine the status of Integrated Pest Management (IPM) programs and the efficacy of conventional pest control practices. Of the 517 survey participants, 12.4% had...

  1. The Dark Energy Survey Data Management System

    E-Print Network [OSTI]

    Sevilla, I; Bertin, E; Carlson, A; Daues, G; Desai, S; Gower, M; Gruendl, R; Hanlon, W; Jarvis, M; Kessler, R; Kuropatkin, N; Lin, H; Marriner, J; Mohr, J; Petravick, D; Sheldon, E; Swanson, M E C; Tomashek, T; Tucker, D; Yang, Y; Yanny, B

    2011-01-01T23:59:59.000Z

    The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

  2. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Sevilla, I.; /Madrid, CIEMAT; Armstrong, R.; Jarvis, M.; /Pennsylvania U.; Bertin, E.; /Paris, Inst. Astrophys.; Carlson, A.; Desai, S.; Mohr, J.; /Munich U.; Daues, G.; Gower, M.; Gruendl, R.; Petravick, D.; /Illinois U., Urbana /Illinois U., Urbana /Chicago U. /Fermilab /Brookhaven /Harvard-Smithsonian Ctr. Astrophys.

    2011-09-01T23:59:59.000Z

    The Dark Energy Survey (DES) is a project with the goal of building, installing and exploiting a new 74 CCD-camera at the Blanco telescope, in order to study the nature of cosmic acceleration. It will cover 5000 square degrees of the southern hemisphere sky and will record the positions and shapes of 300 million galaxies up to redshift 1.4. The survey will be completed using 525 nights during a 5-year period starting in 2012. About O(1 TB) of raw data will be produced every night, including science and calibration images. The DES data management system has been designed for the processing, calibration and archiving of these data. It is being developed by collaborating DES institutions, led by NCSA. In this contribution, we describe the basic functions of the system, what kind of scientific codes are involved and how the Data Challenge process works, to improve simultaneously the Data Management system algorithms and the Science Working Group analysis codes.

  3. Peer to Peer Networks Management Survey

    E-Print Network [OSTI]

    Amad, Mourad; Aďssani, Djamil

    2012-01-01T23:59:59.000Z

    Peer-to-Peer systems are based on the concept of resources localization and mutualisation in dynamic context. In specific environment such as mobile networks, characterized by high variability and dynamicity of network conditions and performances, where nodes can join and leave the network dynamically, resources reliability and availability constitute a critical issue. The resource discovery problem arises in the context of peer to peer (P2P) networks, where at any point of time a peer may be placed at or removed from any location over a general purpose network. Locating a resource or service efficiently is one of the most important issues related to peer-to-peer networks. The objective of a search mechanism is to successfully locate resources while incurring low overhead and low delay. This paper presents a survey on P2P networks management: classification, applications, platforms, simulators and security.

  4. Survey of National Programs for Managing High-Level Radioactive

    E-Print Network [OSTI]

    Survey of National Programs for Managing High-Level Radioactive Waste and Spent Nuclear Fuel-Level Radioactive Waste and Spent Nuclear Fuel A Report to Congress and the Secretary of Energy October 2009 #12 Board #12;#12;U.S. Nuclear Waste Technical Review Board Survey of National Programs for Managing High

  5. A Survey on Trust Management for Intelligent Transportation System

    E-Print Network [OSTI]

    Wolfson, Ouri E.

    A Survey on Trust Management for Intelligent Transportation System Shuo Ma, Ouri Wolfson Department@uic.edu ABSTRACT Trust management is a fundamental and critical aspect of any serious application in ITS. However, only a few studies have addressed this important problem. In this paper, we present a survey on trust

  6. Storage Management for Object-Oriented Database Management Systems: A Comparative Survey

    E-Print Network [OSTI]

    Waterloo, University of

    Storage Management for Object-Oriented Database Management Systems: A Comparative Survey David Dueck, Yiwen Jiang, and Archana Sawhney Contents 1 Introduction * * 71 2 The O2 Object Manager 71 2.1 Object

  7. Materials and Security Consolidation Complex Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables

    SciTech Connect (OSTI)

    Not Listed

    2011-09-01T23:59:59.000Z

    Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory's Materials and Security Consolidation Center facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facility-specific documents. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool for developing the radioactive waste management basis.

  8. Central Facilities Area Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables

    SciTech Connect (OSTI)

    Lisa Harvego; Brion Bennett

    2011-11-01T23:59:59.000Z

    Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory's Central Facilities Area facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facilityspecific documents. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool for developing the radioactive waste management basis.

  9. Materials and Fuels Complex Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables

    SciTech Connect (OSTI)

    Lisa Harvego; Brion Bennett

    2011-09-01T23:59:59.000Z

    Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory's Materials and Fuels Complex facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facility-specific documents. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool for developing the radioactive waste management basis.

  10. Research and Education Campus Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables

    SciTech Connect (OSTI)

    L. Harvego; Brion Bennett

    2011-11-01T23:59:59.000Z

    U.S. Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory Research and Education Campus facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facility-specific documents. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool to develop the radioactive waste management basis.

  11. Intelligent Sensor Management in Nuclear Searches and Radiological Surveys A.V. Klimenko1

    E-Print Network [OSTI]

    Tanner, Herbert G.

    Intelligent Sensor Management in Nuclear Searches and Radiological Surveys A.V. Klimenko1 , W developed intelligent sensor management strategies for nuclear search and radiological surveys positives. RADIATION FIELD MODEL The present approach to the radiological survey and nuclear search

  12. OHS certification and legal compliance management in France: a quantitative survey

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    OHS certification and legal compliance management in France: a quantitative survey Thomas the principal results. Keywords: Occupational health and safety, quantitative survey, management of legal, Sophia Antipolis, France b PREVENTEO, Le Cannet, France Abstract: Management of legal compliance

  13. Advanced Test Reactor Complex Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables

    SciTech Connect (OSTI)

    Lisa Harvego; Brion Bennett

    2011-11-01T23:59:59.000Z

    U.S. Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory's Advanced Test Reactor Complex facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facility-specific documents. U.S. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool to develop the radioactive waste management basis.

  14. Business Process Management: A Comprehensive Survey

    E-Print Network [OSTI]

    van der Aalst, Wil

    . Business Process Management (BPM) research resulted in a plethora of methods, techniques, and tools aims to structure these results and provides an overview of the state-of-the-art in BPM. In BPM the con, the introduction of BPM technology has both managerial and technical ramifications, and may enable significant

  15. Scientific basis for risk assessment and management of uranium mill tailings

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    A National Research Council study panel, convened by the Board on Radioactive Waste Management, has examined the scientific basis for risk assessment and management of uranium mill tailings and issued this final report containing a number of recommendations. Chapter 1 provides a brief introduction to the problem. Chapter 2 examines the processes of uranium extraction and the mechanisms by which radionuclides and toxic chemicals contained in the ore can enter the environment. Chapter 3 is devoted to a review of the evidence on health risks associated with radon and its decay products. Chapter 4 provides a consideration of conventional and possible new technical alternatives for tailings management. Chapter 5 explores a number of issues of comparative risk, provides a brief history of uranium mill tailings regulation, and concludes with a discussion of choices that must be made in mill tailing risk management. 211 refs., 30 figs., 27 tabs.

  16. Security Survey of Internet Browsers Data Managers

    E-Print Network [OSTI]

    Boja, Catalin

    2011-01-01T23:59:59.000Z

    The paper analyses current versions of top three used Internet browsers and compare their security levels to a research done in 2006. The security is measured by analyzing how user data is stored. Data recorded during different browsing sessions and by different password management functions it is considered sensitive data. The paper describes how the browser protects the sensitive data and how an attacker or a forensic analyst can access it.

  17. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  18. Workshop proceedings: Developing the scientific basis for long-term land management of the Idaho National Engineering and Environmental Laboratory

    SciTech Connect (OSTI)

    Sperber, T.D.; Reynolds, T.D. [eds.] [Environmental Science and Research Foundation, Inc., Idaho Falls, ID (United States); Breckenridge, R.P. [ed.] [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States)

    1998-03-01T23:59:59.000Z

    Responses to a survey on the INEEL Comprehensive Facility and Land Use Plan (US DOE 1996a) indicated the need for additional discussion on environmental resources, disturbance, and land use issues on the Idaho National Engineering and Environmental Laboratory (INEEL). As a result, in September 1997, a workshop evaluated the existing scientific basis and determined future data needs for long-term land management on the INEEL. This INEEL Long-Term Land Management Workshop examined existing data on biotic, abiotic, and heritage resources and how these resources have been impacted by disturbance activities of the INEEL. Information gained from this workshop will help guide land and facility use decisions, identify data gaps, and focus future research efforts. This report summarizes background information on the INEEL and its long-term land use planning efforts, presentations and discussions at the workshop, and the existing data available at the INEEL. In this document, recommendations for future INEEL land use planning, research efforts, and future workshops are presented. The authors emphasize these are not policy statements, but comments and suggestions made by scientists and others participating in the workshop. Several appendices covering land use disturbance, legal drivers, land use assumptions and workshop participant comments, workshop participants and contributors, and the workshop agenda are also included.

  19. White-tailed Deer Management Employee Survey Results and Path Forward

    E-Print Network [OSTI]

    Homes, Christopher C.

    White-tailed Deer Management Employee Survey Results and Path Forward Community Advisory Council at ~700 animals 1999 ­ Initial discussions for population management 2001 ­ Routine population surveys marked "don't know" #12;13 Survey Results (cont.) Statement 7 ­ What is your preference for managing deer

  20. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    SciTech Connect (OSTI)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25T23:59:59.000Z

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

  1. Integrated Pest Management: Conducting Urban Rodent Surveys i Suggested citation: Centers for Disease Control and Prevention. Integrated pest management: conducting urban

    E-Print Network [OSTI]

    #12;Integrated Pest Management: Conducting Urban Rodent Surveys i Suggested citation: Centers for Disease Control and Prevention. Integrated pest management: conducting urban rodent surveys. Atlanta: US...........................................................................................................................2 Characteristics of Urban Rodent Surveys

  2. Beef Cow Management Survey USDA NAHMS 2007-2008 Max Irsik DVM, MAB

    E-Print Network [OSTI]

    Watson, Craig A.

    identification survey results (USDA NAHMS 2007-2008) Beef cow management practices Percent of Operations by typeBeef Cow Management Survey USDA NAHMS 2007-2008 Max Irsik DVM, MAB Beef Cattle Extension-calf operations. The Beef 2007-08 study focused on health and management practices on U.S. beef operations from 24

  3. The Zeeman Effect in Finance: Libor Spectroscopy and Basis Risk Management

    E-Print Network [OSTI]

    Marco Bianchetti

    2012-10-27T23:59:59.000Z

    Once upon a time there was a classical financial world in which all the Libors were equal. Standard textbooks taught that simple relations held, such that, for example, a 6 months Libor Deposit was replicable with a 3 months Libor Deposits plus a 3x6 months Forward Rate Agreement (FRA), and that Libor was a good proxy of the risk free rate required as basic building block of no-arbitrage pricing theory. Nowadays, in the modern financial world after the credit crunch, some Libors are more equal than others, depending on their rate tenor, and classical formulas are history. Banks are not anymore too "big to fail", Libors are fixed by panels of risky banks, and they are risky rates themselves. These simple empirical facts carry very important consequences in derivative's trading and risk management, such as, for example, basis risk, collateralization and regulatory pressure in favour of Central Counterparties. Something that should be carefully considered by anyone managing even a single plain vanilla Swap. In this qualitative note we review the problem trying to shed some light on this modern animal farm, recurring to an analogy with quantum physics, the Zeeman effect.

  4. The Zeeman Effect in Finance: Libor Spectroscopy and Basis Risk Management

    E-Print Network [OSTI]

    Bianchetti, Marco

    2012-01-01T23:59:59.000Z

    Once upon a time there was a classical financial world in which all the Libors were equal. Standard textbooks taught that simple relations held, such that, for example, a 6 months Libor Deposit was replicable with a 3 months Libor Deposits plus a 3x6 months Forward Rate Agreement (FRA), and that Libor was a good proxy of the risk free rate required as basic building block of no-arbitrage pricing theory. Nowadays, in the modern financial world after the credit crunch, some Libors are more equal than others, depending on their rate tenor, and classical formulas are history. Banks are not anymore too "big to fail", Libors are fixed by panels of risky banks, and they are risky rates themselves. These simple empirical facts carry very important consequences in derivative's trading and risk management, such as, for example, basis risk, collateralization and regulatory pressure in favour of Central Counterparties. Something that should be carefully considered by anyone managing even a single plain vanilla Swap. In t...

  5. Survey of Seeps and Springs within the Bureau of Land Management's Grand Junction Field Office Management Area

    E-Print Network [OSTI]

    Survey of Seeps and Springs within the Bureau of Land Management's Grand Junction Field Office Management Area (Mesa County, CO) Colorado Natural Heritage Program Colorado State University 8002 Campus Delivery Fort Collins, Colorado 80523-8002 #12;Survey of Seeps and Springs within the Bureau of Land

  6. Survey of Seeps and Springs within the Bureau of Land Management's Grand Junction Field Office Management Area

    E-Print Network [OSTI]

    Survey of Seeps and Springs within the Bureau of Land Management's Grand Junction Field Office Management Area (Garfield County, CO) Colorado Natural Heritage Program College of Natural Resources, 254 General Services Building Colorado State University Fort Collins, Colorado 80523 #12;Survey of Seeps

  7. The Mixed Waste Management Facility. Design basis integrated operations plan (Title I design)

    SciTech Connect (OSTI)

    NONE

    1994-12-01T23:59:59.000Z

    The Mixed Waste Management Facility (MWMF) will be a fully integrated, pilotscale facility for the demonstration of low-level, organic-matrix mixed waste treatment technologies. It will provide the bridge from bench-scale demonstrated technologies to the deployment and operation of full-scale treatment facilities. The MWMF is a key element in reducing the risk in deployment of effective and environmentally acceptable treatment processes for organic mixed-waste streams. The MWMF will provide the engineering test data, formal evaluation, and operating experience that will be required for these demonstration systems to become accepted by EPA and deployable in waste treatment facilities. The deployment will also demonstrate how to approach the permitting process with the regulatory agencies and how to operate and maintain the processes in a safe manner. This document describes, at a high level, how the facility will be designed and operated to achieve this mission. It frequently refers the reader to additional documentation that provides more detail in specific areas. Effective evaluation of a technology consists of a variety of informal and formal demonstrations involving individual technology systems or subsystems, integrated technology system combinations, or complete integrated treatment trains. Informal demonstrations will typically be used to gather general operating information and to establish a basis for development of formal demonstration plans. Formal demonstrations consist of a specific series of tests that are used to rigorously demonstrate the operation or performance of a specific system configuration.

  8. 1A Appendix A--Statewide Management Assessment of Invasive Species in Oregon APPENDIX A. OREGON STATEWIDE MANAGEMENT ASSESSMENT OF INVASIVE SPECIES SURVEY

    E-Print Network [OSTI]

    STATEWIDE MANAGEMENT ASSESSMENT OF INVASIVE SPECIES SURVEY OISC Statewide Management Assessment of Invasive will not be shared. Rather, survey responses will be compiled as part of this statewide management assessment Species Survey and Management Question 2 If you conducted invasive species work in your fiscal year 2008

  9. A Survey of Self-Management in Dynamic Software Architecture Specifications

    E-Print Network [OSTI]

    Bradbury, Jeremy S.

    A Survey of Self-Management in Dynamic Software Architecture Specifications Jeremy S. Bradburya understanding of the foundations of this type of software evolutionary change. In this paper we survey 14 formal specification approaches based on graphs, process algebras, logic, and other formalisms. Our survey

  10. Assessing the Situation at El Pilar: Chronology, Survey, Conservation, and Management Planning for the 21st Century

    E-Print Network [OSTI]

    Ford, Anabel; Wernecke, Clark

    2000-01-01T23:59:59.000Z

    CHRONOLOGY, SURVEY, CONSERVATION, AND MANAGEMENT PLANNINGsurvey inventory, resource conservation, and managementsurvey protocol and field test would be important to the development of management

  11. PS2: Managing the next step in the Pan-STARRS wide field survey system

    E-Print Network [OSTI]

    Burgett, William S

    2012-01-01T23:59:59.000Z

    The Panoramic Survey Telescope and Rapid Response System (Pan-STARRS) is unique among the existing or planned major ground-based optical survey systems as the only "distributed aperture" system. The concept of increasing system \\'etendue by replicating small telescopes and digital cameras presents both management opportunities and challenges. The focus in this paper is on management lessons learned from PS1, and how those have been used to form the management plan for PS2. The management plan components emphasized here include technical development, financial and schedule planning, and critical path and risk management. Finally, the status and schedule for PS2 are presented.

  12. Risks and Risk Management in Software Architecture Evolution: an Industrial Survey

    E-Print Network [OSTI]

    van Vliet, Hans

    Risks and Risk Management in Software Architecture Evolution: an Industrial Survey Odd Petter N that has been made to study risk management in the context of software architecture and its evolution, has, in order to capture a more complete picture of the risk and management issues in software architecture

  13. A Taxonomy and Survey of Grid Resource Management Systems Klaus Krauter1

    E-Print Network [OSTI]

    Buyya, Rajkumar

    1 A Taxonomy and Survey of Grid Resource Management Systems Klaus Krauter1 , Rajkumar Buyya2. In this paper, we develop a comprehensive taxonomy for describing resource management architectures. We use this taxonomy in identifying approaches followed in the implementation of real resource management systems

  14. Survey of Students' Technology Use for Time Management Till Rebenich, Andrew M. Gravell, Thanassis Tiropanis

    E-Print Network [OSTI]

    Gravell, Andrew M.

    Survey of Students' Technology Use for Time Management Till Rebenich, Andrew M. Gravell, Thanassis, and a wide range of different technologies is used. Those who reported poor time management use more lacks features for study planning. Furthermore, students using software for time management make less

  15. Hemodynamic monitoring and management in patients undergoing high risk surgery: a survey among North American and European anesthesiologists

    E-Print Network [OSTI]

    Cannesson, Maxime; Pestel, Gunther; Ricks, Cameron; Hoeft, Andreas; Perel, Azriel

    2011-01-01T23:59:59.000Z

    and management in patients undergoing high risk surgery: a surveyand management in patients undergoing high risk surgery: a surveyand management in patients undergoing high-risk surgery. Materials and methods A survey

  16. Survey Report: Improving Integration of Program Management and Systems Engineering

    E-Print Network [OSTI]

    Conforto, Edivandro

    For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

  17. Staffing for Electronic Resource Management: the Results of a Survey

    E-Print Network [OSTI]

    Duranceau, Ellen

    2002-01-01T23:59:59.000Z

    The authors offer the results of an informal survey of library staffing trends related to the acquisition and maintenance of electronic resources. They test their hypothesis that the problem of staffing for e-resources has ...

  18. Surveys in Operations Research and Management Science 16 (2011) 4966 Contents lists available at ScienceDirect

    E-Print Network [OSTI]

    Uryasev, Stanislav

    2011-01-01T23:59:59.000Z

    Surveys in Operations Research and Management Science 16 (2011) 49­66 Contents lists available at ScienceDirect Surveys in Operations Research and Management Science journal homepage: www 2010 Accepted 8 August 2010 a b s t r a c t This paper surveys the most recent advances in the context

  19. IEEE Communications Surveys http://www.comsoc.org/pubs/surveys Fourth Quarter 1998 Vol. 1 No. 12 SPECTRUM MANAGEMENT POLICY OPTIONS

    E-Print Network [OSTI]

    Peha, Jon M.

    IEEE Communications Surveys · http://www.comsoc.org/pubs/surveys · Fourth Quarter 1998 · Vol. 1 No. 12 SPECTRUM MANAGEMENT POLICY OPTIONS ncreasing use of wireless devices early in this century led led the way in bringing market-based reform to the con- text of spectrum management, or at least one

  20. Proceedings of the symposium on Scientific Basis for Nuclear Waste Management XXX

    SciTech Connect (OSTI)

    Dunn, Darrell [ed. Southwest Research Inst., San Antonio, Texas (United States); Poinssot, Christophe [ed. CEA-Saclay, 91191 Gif-sur-Yvette cedex (France); Begg, Bruce [ed. Australian Nuclear Science and Technology Organisation, Lucas Heights, NSW (Australia)

    2007-07-01T23:59:59.000Z

    Management of nuclear waste remains an important international topic that includes reprocessing of commercial nuclear fuel, waste-form design and development, storage and disposal packaging, the process of repository site selection, system design, and performance assessment. Requirements to manage and dispose of materials from the production of nuclear weapons, and the renewed interest in nuclear power, in particular through the Generation IV Forum and the Advanced Fuel Cycle Initiative, can be expected to increase the need for scientific advances in waste management. A broad range of scientific and engineering disciplines is necessary to provide safe and effective solutions and address complex issues. This volume offers an interdisciplinary perspective on materials-related issues associated with nuclear waste management programs. Invited and contributed papers cover a wide range of topics including studies on: spent fuel; performance assessment and models; waste forms for low- and intermediate-level waste; ceramic and glass waste forms for plutonium and high-level waste; radionuclides; containers and engineered barriers; disposal environments and site characteristics; and partitioning and transmutation.

  1. Area 5 Radioactive Waste Management Complex Administrative Boundary Survey

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2009-05-07T23:59:59.000Z

    A package sent to the Bureau of Land Management containing a property description, a notice of intent to relinquish, aerial photos, and engineering drawings

  2. Who wants to become an arts manager? A survey on applicants to master's programmes in arts and cultural

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Who wants to become an arts manager? A survey on applicants to master's programmes in arts of vocations for cultural management. My analysis of this genesis is based on a survey on applicants and cultural management in France Vincent Dubois, Professor of sociology and political science, Institute

  3. Corporate Energy Management: A Survey of Large Manufacturing Companies

    E-Print Network [OSTI]

    Norland, D. L.; Lind, L.

    Corporate practices regarding energy management vary substantially from one company to another. Some companies pay close attention to energy use throughout the corporation while others pay scant attention. This paper first describes what we call...

  4. Occupational Pension Schemes and Human Resource Management: Some Survey Evidence 

    E-Print Network [OSTI]

    White, Phil; Terry, N

    1997-01-01T23:59:59.000Z

    Definitions of Human Resource Management (HRM) have been both numerous and multifaceted and various classifications have been arranged to try to capture the essence of HRM. Although there is not one rigid "HRM position", it does appear...

  5. Assessing the Situation at El Pilar: Chronology, Survey, Conservation, and Management Planning for the 21st Century

    E-Print Network [OSTI]

    Ford, Anabel; Wernecke, Clark

    2000-01-01T23:59:59.000Z

    plan, critical to resource management, and imperative to archaeological study of the urban qualities of ancient El Pilar, the complete survey

  6. Basis for a Waste Management Public Communication Policy: Actual Situation Analysis and Implementation of Corrective Actions

    SciTech Connect (OSTI)

    Jolivet, L. A.; Maset, E. R.

    2002-02-28T23:59:59.000Z

    Argentina will require new sites for the location of radioactive waste final disposal systems. It is currently mandatory to have social and political consensus to obtain the corresponding agreements. The experience obtained with the cancellation of the project ''Feasibility Study and Engineering Project--Repository for High Level Radioactive Waste'', reinforces even more the necessity to count with the acceptance of the public to carry out projects of this kind. The first phase of the former was developed in the 80's: geological, geophysical and hydrogeological studies were performed in a compact granitic rock located in Sierra del Medio, Chubut province. This project had to be called off in the early 90's due to strong social rejection. This decision was closely related to the poor attention given to social communication issues. The governmental decision-makers in charge underwent a lot of pressure from social groups claiming for the cancellation of the project due to the lack of information and the fear it triggered. Thus, the lesson learnt: ''social communication activities must be carefully undertaken in order to achieve the appropriate management of the radioactive waste produced in our country.'' The same as in other countries, the specific National Law demands the formulation of a Strategic Plan which will not only include the research into radioactive waste, but the design of a Social Communication Programme as well. The latter will be in charge of informing the population clearly and objectively about the latest scientific and technological advances in the issue. A tentative perception-attitude pattern of the Argentine society about the overall nuclear issue is outlined in this paper. It is meant to contribute to the understanding of the public's adverse reaction to this kind of project. A communication programme is also presented. Its objective is to install the waste management topic in the public's opinion with a positive real outlook.

  7. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    SciTech Connect (OSTI)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01T23:59:59.000Z

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  8. Managing and Querying Web Services Communities: A Survey

    E-Print Network [OSTI]

    Limam, Hela

    2011-01-01T23:59:59.000Z

    With the advance of Web Services technologies and the emergence of Web Services into the information space, tremendous opportunities for empowering users and organizations appear in various application domains including electronic commerce, travel, intelligence information gathering and analysis, health care, digital government, etc. However, the technology to organize, search, integrate these Web Services has not kept pace with the rapid growth of the available information space. The number of Web Services to be integrated may be large and continuously changing. To ease and improve the process of Web services discovery in an open environment like the Internet, it is suggested to gather similar Web services into groups known as communities. Although Web services are intensively investigated, the community management issues have not been addressed yet In this paper we draw an overview of several Web services Communities' management approaches based on some currently existing communities platforms and framework...

  9. Perspectives on AFVs: 1996 Federal Fleet Manager Survey

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPO WebsitePalmsthePersonnel Management Federal Fleet

  10. Preliminary Results from a State-of-the-Practice Survey on Risk Management in Off-The-Shelf

    E-Print Network [OSTI]

    Preliminary Results from a State-of-the-Practice Survey on Risk Management in Off in software development. Previous studies have identified typical risks and related risk management strategies-proven guidelines to help project managers to identify and manage these risks. We are performing an international

  11. A patient-based national survey on postoperative pain management in France reveals significant achievements and persistent challenges

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A patient-based national survey on postoperative pain management in France reveals significant.1016/j.pain.2008.02.026 #12; Abstract (249 words) We carried out a national survey on postoperative pain (POP) management in a representative sample (public/private, teaching/non teaching, size) of 76

  12. POLICY GUIDANCE MEMORANDUM #16 OPM Managers' Satisfaction Survey |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM5 Accretion-of-Duties POLICY GUIDANCE

  13. A Survey Of Techniques for Managing and Leveraging Caches in GPUs

    SciTech Connect (OSTI)

    Mittal, Sparsh [ORNL

    2014-09-01T23:59:59.000Z

    Initially introduced as special-purpose accelerators for graphics applications, graphics processing units (GPUs) have now emerged as general purpose computing platforms for a wide range of applications. To address the requirements of these applications, modern GPUs include sizable hardware-managed caches. However, several factors, such as unique architecture of GPU, rise of CPU–GPU heterogeneous computing, etc., demand effective management of caches to achieve high performance and energy efficiency. Recently, several techniques have been proposed for this purpose. In this paper, we survey several architectural and system-level techniques proposed for managing and leveraging GPU caches. We also discuss the importance and challenges of cache management in GPUs. The aim of this paper is to provide the readers insights into cache management techniques for GPUs and motivate them to propose even better techniques for leveraging the full potential of caches in the GPUs of tomorrow.

  14. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-01-01T23:59:59.000Z

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  15. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11T23:59:59.000Z

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

  16. An Evaluation of the Federal Energy Management Program Technical Assistance Workshops: Results of a 1998 Customer Survey

    SciTech Connect (OSTI)

    G. B. Gordon; N. Hall

    1999-04-01T23:59:59.000Z

    This report presents the results of a customer telephone survey of the participants of six workshops provided by the U. S. Department of Energy Federal Energy Management Program (FEMP) during calendar years 1995 and 1996. The primary purpose for the survey was to provide the Team Leader for FEMP Technical Assistance and members of the team with detailed customer feedback pertaining to how well selected FEMP workshops are doing and to identify areas for improvement. The information presented enables managers to see both the strengths of their workshops, as well as workshop components that can be improved. In addition, the report identifies the questions included in the survey that were the most productive for obtaining customers experiences, opinions and recommendations. The experiences gained during this survey provide a platform from which to launch an annual FEMP customer survey.

  17. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Peterson, M.J.

    2005-12-20T23:59:59.000Z

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

  18. Supervisory Power Management Control Algorithms for Hybrid Electric Vehicles: A Survey

    SciTech Connect (OSTI)

    Malikopoulos, Andreas [ORNL

    2014-01-01T23:59:59.000Z

    The growing necessity for environmentally benign hybrid propulsion systems has led to the development of advanced power management control algorithms to maximize fuel economy and minimize pollutant emissions. This paper surveys the control algorithms for hybrid electric vehicles (HEVs) and plug-in HEVs (PHEVs) that have been reported in the literature to date. The exposition ranges from parallel, series, and power split HEVs and PHEVs and includes a classification of the algorithms in terms of their implementation and the chronological order of their appearance. Remaining challenges and potential future research directions are also discussed.

  19. Indirect Assessment: Sport management candidates are required to complete a graduating senior survey, which is based on the program's learning outcomes. The results of this survey are analyzed by program faculty and used to make curricular changes as nece

    E-Print Network [OSTI]

    Asaithambi, Asai

    Indirect Assessment: Sport management candidates are required to complete a graduating senior survey, which is based on the program's learning outcomes. The results of this survey are analyzed by program faculty and used to make curricular changes as necessary. Direct Assessment: Sport Management

  20. Cyber-infrastructure to Support Science and Data Management for the Dark Energy Survey

    E-Print Network [OSTI]

    C. Ngeow; J. J. Mohr; T. Alam; W. A. Barkhouse; C. Beldica; D. Cai; G. Daues; R. Plante; J. Annis; H. Lin; D. Tucker; R. C. Smith

    2006-08-11T23:59:59.000Z

    The Dark Energy Survey (DES; operations 2009-2015) will address the nature of dark energy using four independent and complementary techniques: (1) a galaxy cluster survey over 4000 deg2 in collaboration with the South Pole Telescope Sunyaev-Zel'dovich effect mapping experiment, (2) a cosmic shear measurement over 5000 deg2, (3) a galaxy angular clustering measurement within redshift shells to redshift=1.35, and (4) distance measurements to 1900 supernovae Ia. The DES will produce 200 TB of raw data in four bands, These data will be processed into science ready images and catalogs and co-added into deeper, higher quality images and catalogs. In total, the DES dataset will exceed 1 PB, including a 100 TB catalog database that will serve as a key science analysis tool for the astronomy/cosmology community. The data rate, volume, and duration of the survey require a new type of data management (DM) system that (1) offers a high degree of automation and robustness and (2) leverages the existing high performance computing infrastructure to meet the project's DM targets. The DES DM system consists of (1) a grid-enabled, flexible and scalable middleware developed at NCSA for the broader scientific community, (2) astronomy modules that build upon community software, and (3) a DES archive to support automated processing and to serve DES catalogs and images to the collaboration and the public. In the recent DES Data Challenge 1 we deployed and tested the first version of the DES DM system, successfully reducing 700 GB of raw simulated images into 5 TB of reduced data products and cataloguing 50 million objects with calibrated astrometry and photometry.

  1. The School of Information Management & Systems surveyed the class of 2004 on their post graduation plans. The report summarizes the responses of the SIMS graduates

    E-Print Network [OSTI]

    Militzer, Burkhard

    Overview The School of Information Management & Systems surveyed the class of 2004 on their post graduation plans. The report summarizes the responses of the SIMS graduates that completed the survey graduates in the class of 2004, 26 responded to the survey. That represents a 62% overall response rate

  2. Livestock Basis

    E-Print Network [OSTI]

    Mintert, James R.; Davis, Ernest E.; Dhuyvetter, Kevin C.; Bevers, Stan

    1999-06-23T23:59:59.000Z

    the cash price. Conversely, a positive basis indicates the futures price is less than the cash price. Basis is usually computed using the nearby (closest to expiration) futures con- tract. For example, in October the nearby corn futures contract... for market in September. The October Live Cattle contract is currently trading at $71 per cwt. But what does that mean to you when feeding and selling fin- ished steers in Hereford, Texas? To more accu- rately estimate what your actual selling price might be...

  3. Safety Basis Report

    SciTech Connect (OSTI)

    R.J. Garrett

    2002-01-14T23:59:59.000Z

    As part of the internal Integrated Safety Management Assessment verification process, it was determined that there was a lack of documentation that summarizes the safety basis of the current Yucca Mountain Project (YMP) site characterization activities. It was noted that a safety basis would make it possible to establish a technically justifiable graded approach to the implementation of the requirements identified in the Standards/Requirements Identification Document. The Standards/Requirements Identification Documents commit a facility to compliance with specific requirements and, together with the hazard baseline documentation, provide a technical basis for ensuring that the public and workers are protected. This Safety Basis Report has been developed to establish and document the safety basis of the current site characterization activities, establish and document the hazard baseline, and provide the technical basis for identifying structures, systems, and components (SSCs) that perform functions necessary to protect the public, the worker, and the environment from hazards unique to the YMP site characterization activities. This technical basis for identifying SSCs serves as a grading process for the implementation of programs such as Conduct of Operations (DOE Order 5480.19) and the Suspect/Counterfeit Items Program. In addition, this report provides a consolidated summary of the hazards analyses processes developed to support the design, construction, and operation of the YMP site characterization facilities and, therefore, provides a tool for evaluating the safety impacts of changes to the design and operation of the YMP site characterization activities.

  4. Milk Futures, Options and Basis

    E-Print Network [OSTI]

    Haigh, Michael; Stockton, Matthew; Anderson, David P.; Schwart Jr., Robert B.

    2001-10-12T23:59:59.000Z

    The milk futures and options market enables producers and processors to manage price risk. This publication explains hedging, margin accounts, basis and how to track it, and other fundamentals of the futures and options market....

  5. ORISE: The Medical Basis for Radiation-Accident Preparedness...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Medical Basis for Radiation-Accident Preparedness: Medical Management Proceedings of the Fifth International REACTS Symposium on the Medical Basis for Radiation-Accident...

  6. IEEE COMMUNICATIONS SURVEYS & TUTORIALS, ACCEPTED FOR PUBLICATION 1 Stochastic Information Management in Smart Grid

    E-Print Network [OSTI]

    Shen, Xuemin "Sherman"

    of energy sup- ply for residential, commercial, and industrial sectors in the foreseeable future. However, to reduce the greenhouse gas (GHG) emissions in energy consumption, electricity customers have beenIEEE COMMUNICATIONS SURVEYS & TUTORIALS, ACCEPTED FOR PUBLICATION 1 Stochastic Information

  7. California cotton growers utilize integrated pest management

    E-Print Network [OSTI]

    Brodt, Sonja; Goodell, Peter B.; Krebill-Prather, Rose L.; Vargas, Ron N.

    2007-01-01T23:59:59.000Z

    a comprehensive survey of pest management decision-makingfor overall health. Surveys of pest management prac- ticespest management advice was almost universal among the survey

  8. Does Management Matter? Evidence from India

    E-Print Network [OSTI]

    Bloom, Nicholas; Eifert, Benn; Mahajan, Aprajit; McKenzie, David; Roberts, John

    2012-01-01T23:59:59.000Z

    a detailed ground- based management survey of every textileoutput markets. A2) Management survey in 2011 In 2011 weUS Census 2011 Management and Organization Survey http://

  9. Toward improving the effectiveness of wolf management approaches in Michigan: insights from a 2010 statewide survey

    E-Print Network [OSTI]

    Nelson, Michael P.

    changes (e.g., federal delisting, regulated hunting seasons); public responses management. Current events in Michigan (e.g., delisting) provide an ideal time

  10. NEPA Litigation Surveys

    Broader source: Energy.gov [DOE]

    CEQ publishes surveys on NEPA litigation on an annual basis. These surveys identify the number of cases involving a NEPA based cause of action, Federal agencies that were identified as a lead...

  11. Self Organising Wireless Sensor Networks as a Land Management Tool in Developing Countries: A Preliminary Survey

    E-Print Network [OSTI]

    Haddadi, Hamed

    Self Organising Wireless Sensor Networks as a Land Management Tool in Developing Countries wireless sensor networks do to help? This overview discusses the environmental and technological challenges management. Self organising wireless sensor networks, if implemented adequately, have the potential to target

  12. An Internet survey of private pond owners and managers in Texas

    E-Print Network [OSTI]

    Schonrock, April Elizabeth

    2005-11-01T23:59:59.000Z

    pond owners got the information they used to deal with pond management problems. A secondary emphasis of the project was to examine the potential presented by the Internet for use in this type of information gathering and distribution for Texas...

  13. Survey Questionnaire on Environmental Management Practices: Summary of Results by Industry and practices

    E-Print Network [OSTI]

    Delmas, Magali A; Toffel, Michael W.

    2008-01-01T23:59:59.000Z

    and Engineering-Design Departments Management Utilities Refining Industry Paper Metals Machinery Electronics/Electrical ChemicalsEngineering - Design Department Utilities Refining Industry Paper Metals Machinery Electronics/Electrical Chemicals

  14. Conducting a Motor Survey: Key Step for Establishing a Motor Management Policy

    E-Print Network [OSTI]

    Miller, R. B.

    Roughly 70% of the energy consumed by manufacturing processes is used by electric motors. According to the U.S. Department of Energy, greater attention to motor systems management can reduce motor-related energy costs by 18%. Establishing a motor...

  15. Business Process Management: A Survey W.M.P. van der Aalst1

    E-Print Network [OSTI]

    van der Aalst, Wil

    mathias.weske@hpi.uni-potsdam.de Abstract. Business Process Management (BPM) includes methods, tech- proaches. Although the practical relevance of BPM is undisputed, a clear definition of BPM and related, and argue that BPM could benefit from for- mal methods/languages (cf. Petri nets, process algebras, etc

  16. TRANSPORTATION TOMORROW SURVEY DESIGN AND CONDUCT OF THE SURVEY

    E-Print Network [OSTI]

    Toronto, University of

    OF THE SURVEY Prepared for the Transportation Information Steering Committee by the Data Management Group Bernard Farrol Toronto Transit Commission Allen Reid Town of Orangeville The survey was managedTRANSPORTATION TOMORROW SURVEY 2001 DESIGN AND CONDUCT OF THE SURVEY #12;TRANSPORTATION TOMORROW

  17. Sky Surveys

    E-Print Network [OSTI]

    Djorgovski, S G; Drake, A J; Graham, M J; Donalek, C

    2012-01-01T23:59:59.000Z

    Sky surveys represent a fundamental data basis for astronomy. We use them to map in a systematic way the universe and its constituents, and to discover new types of objects or phenomena. We review the subject, with an emphasis on the wide-field imaging surveys, placing them in a broader scientific and historical context. Surveys are the largest data generators in astronomy, propelled by the advances in information and computation technology, and have transformed the ways in which astronomy is done. We describe the variety and the general properties of surveys, the ways in which they may be quantified and compared, and offer some figures of merit that can be used to compare their scientific discovery potential. Surveys enable a very wide range of science; that is perhaps their key unifying characteristic. As new domains of the observable parameter space open up thanks to the advances in technology, surveys are often the initial step in their exploration. Science can be done with the survey data alone or a comb...

  18. User Survey Results | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    have accessed computing resources during the prior year. The results of the most recent survey are posted here with management responses to concerns or issues identified by our...

  19. Riparian Area. . . . . . . . . . . . . . . . . . . . Management Handbook

    E-Print Network [OSTI]

    Balasundaram, Balabhaskar "Baski"

    ..............................................................................................................19 Bruce Hoagland, Oklahoma Biological Survey and the University of Oklahoma Forest Management Riparian Area. . . . . . . . . . . . . . . . . . . . Management Handbook E-952 Oklahoma Cooperative . . . . . . . . . . . . . Oklahoma Conservation Commission Management Handbook #12

  20. Hanford Generic Interim Safety Basis

    SciTech Connect (OSTI)

    Lavender, J.C.

    1994-09-09T23:59:59.000Z

    The purpose of this document is to identify WHC programs and requirements that are an integral part of the authorization basis for nuclear facilities that are generic to all WHC-managed facilities. The purpose of these programs is to implement the DOE Orders, as WHC becomes contractually obligated to implement them. The Hanford Generic ISB focuses on the institutional controls and safety requirements identified in DOE Order 5480.23, Nuclear Safety Analysis Reports.

  1. Distributed Basis Pursuit

    E-Print Network [OSTI]

    2012-03-14T23:59:59.000Z

    Index Terms—Basis pursuit, distributed optimization, sensor networks, augmented ... and image denoising and restoration [1], [2], compression, fitting and ...

  2. June 2011 BBA Convocation Survey: Career Status Report

    E-Print Network [OSTI]

    Business 6% Entrepreneurship & Innovation 4% Management Science 3% Management & Technology Surveyed 3% Management & Technology Note: 25% of surveyed graduates have declared more than one concentrationJune 2011 BBA Convocation Survey: Career Status Report Overview 2011 June graduating class*: 492

  3. Managing Data-Poor Fisheries Workshop: Case Studies, Models and Solutions

    E-Print Network [OSTI]

    Starr, Richard M.; Culver, Carolynn S.; Pomeroy, Caroline

    2010-01-01T23:59:59.000Z

    Fisheries Statistical Survey Management Strategy Evaluationuse inexpensive surveys to expand for regional management. ?use inexpensive surveys to expand for regional management. ?

  4. Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-12-19T23:59:59.000Z

    This Standard describes a framework and the criteria to be used for approval of (1) safety basis documents, as required by 10 Code of Federal Regulation (C.F.R.) 830, Nuclear Safety Management, and (2) safety design basis documents, as required by Department of Energy (DOE) Standard (STD)-1189-2008, Integration of Safety into the Design Process.

  5. Ground Gravity Survey At Neal Hot Springs Geothermal Area (Colwell...

    Open Energy Info (EERE)

    Technique Ground Gravity Survey Activity Date 2011 - 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Gravity surveys were conducted to gain a better...

  6. Basi di dati: Funzionalit,

    E-Print Network [OSTI]

    Ghelli, Giorgio

    Basi di dati: Funzionalità, Progettazione, Interrogazione Giorgio Ghelli DBMS's 2 Temi · Funzionalità ed uso dei DBMS · Progettazione di una Base di Dati · Interrogazione di una Base di Dati Funzionalità dei DBMS DBMS's 4 Riferimenti · A. Albano, G. Ghelli, R. Orsini, Basi di Dati Relazionali e

  7. The LLNL Heavy Element Facility -- Facility Management, Authorization Basis, and Readiness Assessment Lessons Learned in the Heavy Element Facility (B251) Transition from Category II Nuclear Facility to Radiological Facility

    SciTech Connect (OSTI)

    Mitchell, M; Anderson, B; Brown, E; Gray, L

    2006-04-10T23:59:59.000Z

    This paper presents Facility Management, Readiness Assessment, and Authorization Basis experience gained and lessons learned during the Heavy Element Facility Risk Reduction Program (RRP). The RRP was tasked with removing contaminated glove boxes, radioactive inventory, and contaminated ventilation systems from the Heavy Element Facility (B251) at Lawrence Livermore National Laboratory (LLNL). The RRP was successful in its goal in April 2005 with the successful downgrade of B251 from a Category II Nuclear Facility to a Radiological Facility. The expertise gained and the lessons learned during the planning and conduct of the RRP included development of unique approaches in work planning/work control (''Expect the unexpected and confirm the expected'') and facility management. These approaches minimized worker dose and resulted in significant safety improvements and operational efficiencies. These lessons learned can help similar operational and management activities at other sites, including facilities restarting operations or new facility startup. B251 was constructed at LLNL to provide research areas for conducting experiments in radiochemistry using transuranic elements. Activities at B251 once included the preparation of tracer sets associated with the underground testing of nuclear devices and basic research devoted to a better understanding of the chemical and nuclear behavior of the transuranic elements. Due to the age of the facility, even with preventative maintenance, facility safety and experimental systems were deteriorating. A variety of seismic standards were used in the facility design and construction, which encompassed eight building increments constructed over a period of 26 years. The cost to bring the facility into compliance with the current seismic and other requirements was prohibitive, and simply maintaining B251 as a Category II nuclear facility posed serious cost considerations under a changing regulatory environment. Considering the high cost of maintenance and seismic upgrades, the RRP was created to mitigate the risk of dispersal of radioactive material during an earthquake by removing the radioactive materials inventory and glove box contamination. LLNL adopted the goal of reducing the hazard categorization of the Facility from a Category II Nuclear Facility to a Radiological Facility. To support the RRP, B251 transitioned from a standby to a fully operational Category II Nuclear Facility, compliant with current regulations. A work control process was developed, procedures were developed, Authorization Basis Documents were created, work plans were written, off-normal drills practiced, a large number of USQ reviews were conducted, and a ''Type II'' Readiness Assessment (RA) was conducted to restart operations. Subsequent RA's focused on specific operations. Finally, a four-step process was followed to reach Radiological Status: (1) Inventory Reduction and D&D activities reduced the inventory and radiological contamination of the facility below the Category III threshold (DOE-STD-1027), (2) Radiological Safety Basis Document (SBD aka HAR) was approved by NNSA, (3) the inventory control system for a Radiological Facility was implemented, and (4) verification by NNSA of radiological status was completed.

  8. Environmental Survey preliminary report, Pinellas Plant, Largo, Florida

    SciTech Connect (OSTI)

    Not Available

    1987-11-01T23:59:59.000Z

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, conducted May 11 through 22, 1987, at the United States Department of Energy (DOE) Pinellas Plant in Largo, Florida. As a Preliminary Report, the contents are subject to revisions, which will be made in a forthcoming Interim Report, based on Albuquerque Operations Office review and comments on technical accuracy, the results of the sampling and analyses, and other information that may come to the Survey team's attention prior to issuance of the Interim Report. The Pinellas Plant is currently operated for DOE by the General Electric Company-Neutron Devices Department (GENDD). The Pinellas Survey is part of the larger DOE-wide Environmental Survey effort announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via no fault'' baseline Surveys, existing environmental problems are areas of environmental risk at DOE facilities and to rank them on a DOE-wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct these problems. Because the Survey is no fault'' and is not an audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. 55 refs., 37 figs., 37 tabs.

  9. CRAD, Facility Safety- Nuclear Facility Safety Basis

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis.

  10. An online survey to find out how people manage cancer and cancer related problems in the 12

    E-Print Network [OSTI]

    Anderson, Jim

    following initial cancer treatment There are around two million people in the UK living with or beyond cancer and this number is rising by more than 3% per year. Treatments for cancer such as chemotherapy manage most problems associated with cancer and its treatment on their own as part of their daily lives

  11. PANELS AND OTHER SURVEY EXTENSIONS TO THE

    E-Print Network [OSTI]

    Toronto, University of

    PANELS AND OTHER SURVEY EXTENSIONS TO THE TRANSPORTATION TOMORROW SURVEY Data Management Group of Contents i List of Figures ii List of Tables ii 1. INTRODUCTION 1 2. THE TRANSPORTATION TOMORROW SURVEY (TTS) PROGRAM 3 3. PLANNING ISSUES WITHIN THE GTA 7 4. PANEL SURVEYS 10 5. OTHER SURVEY ISSUES

  12. The Brain Basis of Emotions 1 BRAIN BASIS OF EMOTION

    E-Print Network [OSTI]

    Barrett, Lisa Feldman

    The Brain Basis of Emotions 1 BRAIN BASIS OF EMOTION The brain basis of emotion: A meta, Building 149 Charlestown, MA 02129 lindqukr@nmr.mgh.harvard.edu #12;The Brain Basis of Emotions 2 Abstract Researchers have wondered how the brain creates emotions since the early days of psychological science

  13. Results of the radiological survey at the Sacandaga site Glenville, New York. Waste Management Research and Development Programs

    SciTech Connect (OSTI)

    Foley, R.D.; Cottrell, W.D.; Carrier, R.F.

    1992-08-01T23:59:59.000Z

    The Sacandaga site, located on Sacandaga Road, Glenville, New York, was operated by the General Electric Company for the Atomic Energy Commission (AEC) between 1947 and 1951. Originally used for the study and development of radar during World War II, the facilities housed later operations involving physics studies and sodium technology development in support of breeder reactor design and other AEC programs. Though not in use since the original equipment was dismantled and removed in the early 1950s, portions of the 51-acre site are known to contain buried rubble from demolished structures used in former operations. At the request of the Office of Naval Reactors through the Office of Remedial Action and Waste Technology, a characterization of current radiological conditions over the site was performed between August and October 1989. The survey included the measurement of direct radiation levels (gamma, alpha, and beta-gamma) over all surfaces both inside and outside the building and tunnel, radionuclide analysis of systematic, biased, and auger hole soil samples, and analysis of sediments from underground structures. Gamma logging of auger holes was conducted and removable contamination levels inside the tunnel were determined. Samples of soil and structural materials from within and around an excavated concrete bunker were analyzed to determine concentrations of radionuclides and nonradioactive elemental beryllium.

  14. UT MPH STUDENT SURVEY (2013) 1 Master of Public Health Student Survey (2013)

    E-Print Network [OSTI]

    Tennessee, University of

    2013-01-01T23:59:59.000Z

    Planning & Administration will be referred to by its new title, Health Policy and Management. SurveyUT MPH STUDENT SURVEY (2013) 1 Master of Public Health Student Survey (2013) The University of Tennessee An anonymous electronic survey of MPH students was completed in April 2013. The survey

  15. "The Truth Is Out There?" : A Survey of Business Objects

    E-Print Network [OSTI]

    Simons, Anthony J. H.

    for Strategic Management Planning #12;Why Survey? · Gather opinions from IT professionals and user communities"The Truth Is Out There?" : A Survey of Business Objects Kitty Hung PhD Student Department · Why Survey · Survey Methods · Survey Findings · Evaluation · Conclusion & Further Survey · Question

  16. Weed Management Costs, Weed Best Management Practices, and The Roundup Ready Weed Management Program

    E-Print Network [OSTI]

    Mitchell, Paul D.

    substantially increase weed management costs and so discourage adoption. This paper uses survey results: glyphosate, resistance management, BMP adoption, telephone survey, herbicide #12;2 INTRODUCTION Roundup ReadyWeed Management Costs, Weed Best Management Practices, and The Roundup Ready® Weed Management

  17. A Survey of Methods for Analyzing and Improving GPU Energy Efficiency

    SciTech Connect (OSTI)

    Mittal, Sparsh [ORNL; Vetter, Jeffrey S [ORNL

    2014-01-01T23:59:59.000Z

    Recent years have witnessed a phenomenal growth in the computational capabilities and applications of GPUs. However, this trend has also led to dramatic increase in their power consumption. This paper surveys research works on analyzing and improving energy efficiency of GPUs. It also provides a classification of these techniques on the basis of their main research idea. Further, it attempts to synthesize research works which compare energy efficiency of GPUs with other computing systems, e.g. FPGAs and CPUs. The aim of this survey is to provide researchers with knowledge of state-of-the-art in GPU power management and motivate them to architect highly energy-efficient GPUs of tomorrow.

  18. Chapter_7_Surveys_and_Reviews

    Broader source: Energy.gov (indexed) [DOE]

    are protected at the required levels. These programs also provide a basis for line management to make decisions regarding S&S program activities, including allocation of...

  19. Technical Basis and Considerations for DOE M 435.1-1 (Appendix A)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09T23:59:59.000Z

    This appendix establishes the technical basis of the order revision process and of each of the requirements included in the revised radioactive waste management order.

  20. Biological Survey of the Upper Purgatoire Watershed

    E-Print Network [OSTI]

    Biological Survey of the Upper Purgatoire Watershed Las Animas County, CO John Carney Colorado ...............................................................................................................9 Management Urgency Ranks ........................................................................................................10 POTENTIAL CONSERVATION SITE PLANNING BOUNDARIES........................................12 Off

  1. 2009/2010 NERSC User Survey Results

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or job turnaround; 8 were pleased with data services (HPSS, large disk space, data management); 4 complimented good networking, access and security. The complete survey...

  2. Ground Gravity Survey At Dixie Valley Geothermal Area (Allis...

    Open Energy Info (EERE)

    DOE-funding Unknown Exploration Basis Gravity surveys were conducted to monitor the evolution of the geothermal reservoir. Notes A 12 month long experiment was conducted using a...

  3. Indexing contamination surveys

    SciTech Connect (OSTI)

    Brown, R.L.

    1998-02-06T23:59:59.000Z

    The responsibility for safely managing the Tank Farms at Hanford belongs to Lockheed Martin Hanford Corporation which is part of the six company Project Hanford Management Team led by Fluor Daniel Hanford, Inc.. These Tank Farm Facilities contain numerous outdoor contamination areas which are surveyed at a periodicity consistent with the potential radiological conditions, occupancy, and risk of changes in radiological conditions. This document describes the survey documentation and data tracking method devised to track the results of contamination surveys this process is referred to as indexing. The indexing process takes a representative data set as an indicator for the contamination status of the facility. The data are further manipulated into a single value that can be tracked and trended using standard statistical methodology. To report meaningful data, the routine contamination surveys must be performed in a manner that allows the survey method and the data collection process to be recreated. Three key criteria are necessary to accomplish this goal: Accurate maps, consistent documentation, and consistent consolidation of data meeting these criteria provides data of sufficient quality to be tracked. Tracking of survey data is accomplished by converting the individual survey results into a weighted value, corrected for the actual number of survey points. This information can be compared over time using standard statistical analysis to identify trends. At the Tank Farms, the need to track and trend the facility`s radiological status presents unique challenges. Many of these Tank Farm facilities date back to the second world war. The Tank Farm Facilities are exposed to weather extremes, plant and animal intrusion, as well as all of the normal challenges associated with handling radiological waste streams. Routine radiological surveys did not provide a radiological status adequate for continuing comparisons.

  4. System Design and the Safety Basis

    SciTech Connect (OSTI)

    Ellingson, Darrel

    2008-05-06T23:59:59.000Z

    The objective of this paper is to present the Bechtel Jacobs Company, LLC (BJC) Lessons Learned for system design as it relates to safety basis documentation. BJC has had to reconcile incomplete or outdated system description information with current facility safety basis for a number of situations in recent months. This paper has relevance in multiple topical areas including documented safety analysis, decontamination & decommissioning (D&D), safety basis (SB) implementation, safety and design integration, potential inadequacy of the safety analysis (PISA), technical safety requirements (TSR), and unreviewed safety questions. BJC learned that nuclear safety compliance relies on adequate and well documented system design information. A number of PIS As and TSR violations occurred due to inadequate or erroneous system design information. As a corrective action, BJC assessed the occurrences caused by systems design-safety basis interface problems. Safety systems reviewed included the Molten Salt Reactor Experiment (MSRE) Fluorination System, K-1065 fire alarm system, and the K-25 Radiation Criticality Accident Alarm System. The conclusion was that an inadequate knowledge of system design could result in continuous non-compliance issues relating to nuclear safety. This was especially true with older facilities that lacked current as-built drawings coupled with the loss of 'historical knowledge' as personnel retired or moved on in their careers. Walkdown of systems and the updating of drawings are imperative for nuclear safety compliance. System design integration with safety basis has relevance in the Department of Energy (DOE) complex. This paper presents the BJC Lessons Learned in this area. It will be of benefit to DOE contractors that manage and operate an aging population of nuclear facilities.

  5. Solar Site Survey Toolkit

    Broader source: Energy.gov [DOE]

    After a couple outings, a principal technologist at Sandia National Laboratories saw a need for a travel kit that would have the necessary tools to make the task of site surveys more manageable and safer. They have had great success using the kit in the field already.

  6. A Survey of Utility Experience with Real Time Pricing

    SciTech Connect (OSTI)

    Barbose, Galen; Goldman, Charles; Neenan, Bernie

    2004-12-01T23:59:59.000Z

    While more than 70 utilities in the U.S. have offered voluntary RTP tariffs on either a pilot or permanent basis, most have operated in relative obscurity. To bring this broad base of experience to bear on policymakers current efforts to stimulate price responsive demand, we conducted a survey of 43 voluntary RTP tariffs offered in 2003. The survey involved telephone interviews with RTP program managers and other utility staff, as well as a review of regulatory documents, tariff sheets, program evaluations, and other publicly available sources. Based on this review of RTP program experience, we identify key trends related to: utilities motivations for implementing RTP, evolution of RTP tariff design, program participation, participant price response, and program outlook. We draw from these findings to discuss implications for policymakers that are currently considering voluntary RTP as a strategy for developing price responsive demand.

  7. Results of the radiological survey at the ALCOA Research Laboratory, 600 Freeport Road, New Kensington, Pennsylvania (ANK001). Environmental Restoration and Waste Management Non-Defense Programs

    SciTech Connect (OSTI)

    Foley, R.D.; Brown, K.S.

    1992-10-01T23:59:59.000Z

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at the ALCOA Research Laboratory, 600 Freeport Road, New Kensington, Pennsylvania. The survey was performed on November 12, 1991. The purpose of the survey was to determine whether the property was contaminated with radioactive residues, principally {sup 238}U, as a result of work done for the Manhattan Engineer District in 1944. The survey included measurement of direct alpha and beta-gamma levels in the northeast comer of the basement of Building 29, and the collection of a debris sample from a floor drain for radionuclide analysis. The survey area was used for experimental canning of uranium slugs prior to production activities at the former New Kensington Works nearby.

  8. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Review Overview and Management Oversight February 2015 i Standard Review Plan Volume 1 Nuclear Safety Basis Program Review Overview and Management Oversight Facility Life Cycle...

  9. Facility worker technical basis document

    SciTech Connect (OSTI)

    SHULTZ, M.V.

    2003-08-28T23:59:59.000Z

    This technical basis document was developed to support the Tank Farm Documented Safety Analysis (DSA). It describes the criteria and methodology for allocating controls to hazardous conditions with significant facility work consequence and presents the results of the allocation.

  10. Basis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade5-F,INITIAL

  11. Basis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade5-F,INITIALoperator bispectral analysis

  12. CNR GRADUATION SURVEY RESULTS Fall, 2002

    E-Print Network [OSTI]

    (38% are employed or attending grad school) #12;Natural Resource Management (17 completed surveys) 4CNR GRADUATION SURVEY RESULTS Fall, 2002 Received 73 completed surveys out of 79 students or are planning to attend graduate school after graduation $21,710 Average salary of the students who indicated

  13. A Framework for Classification of Traffic Management Practices as Reasonable or Unreasonable

    E-Print Network [OSTI]

    Jordan, Scott

    2010-01-01T23:59:59.000Z

    We present a survey of traf?c management techniques andsection presents a survey of traf?c management techniques to

  14. Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy

    E-Print Network [OSTI]

    Claridge, D. E.; Haberl, J. S.; Bryant, J.; Poyner, B.; McBride, J.

    1991-01-01T23:59:59.000Z

    Forrestal Building Summary: Alternate #3: DaycareOnly 05/02/91 Energy Systems Laboratory Texas A&M University, March 1991 Forrestal PreMAP, page 22 Forrestal Building Summary: Alternate #3: Daycare Only (cont.) 05/02/91 Neat Supplies Estimate: $2,000 Wire...USE OF ENERGY MANAGEMENT AND CONTROL SYSTEMS FOR PERFORMANCE MONITORING OF RETROFIT PROJECTS Preliminary Engineering Survey < U.S.D.O.E. Forrestal Building and Germantown Facility March 1991 Grant #DE-FG01-90CE21003 David E. Claridge, Ph.D., P...

  15. NEAT-IGERT Proposal C. THEMATIC BASIS FOR GROUP EFFORT

    E-Print Network [OSTI]

    Islam, M. Saif

    NEAT-IGERT Proposal C. THEMATIC BASIS FOR GROUP EFFORT The last decade has seen immense progress the research and teaching interests of fourteen investigators in seven different departments ranging from, to the actual structure and management of the group. The Ph.D.'s from this program will be well poised to embark

  16. CRAD, Safety Basis- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Safety Basis at the Idaho Accelerated Retrieval Project Phase II.

  17. CRAD, Safety Basis- Idaho MF-628 Drum Treatment Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2007 readiness assessment of the Safety Basis at the Advanced Mixed Waste Treatment Project.

  18. Facility worker technical basis document

    SciTech Connect (OSTI)

    EVANS, C.B.

    2003-03-21T23:59:59.000Z

    This report documents the technical basis for facility worker safety to support the Tank Farms Documented Safety Analysis and described the criteria and methodology for allocating controls to hazardous conditions with significant facility worker consequences and presents the results of the allocation.

  19. Final Report - Independent Verification Survey Report for the Waste Loading Area, Former Hazardous Waste Management Facility, Brookhaven National Laboratory, Upton, New York

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-19T23:59:59.000Z

    The objective of the verification survey was to obtain evidence by means of measurements and sampling to confirm that the final radiological conditions were less than the established release criteria. This objective was achieved via multiple verification components including document reviews to determine the accuracy and adequacy of FSS documentation.

  20. INL FCF Basis Review Follow-up

    Broader source: Energy.gov (indexed) [DOE]

    Basis. The four Significant Issues addressed the: 1) analysis of cadmium releases in seismic events, 2) analysis of radiological releases following an evaluation basis earthquake...

  1. Organic solvent technical basis document

    SciTech Connect (OSTI)

    SANDGREN, K.R.

    2003-03-22T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for the organic solvent fire representative and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described in this report.

  2. Robotic Surveying

    SciTech Connect (OSTI)

    Suzy Cantor-McKinney; Michael Kruzic

    2007-03-01T23:59:59.000Z

    ZAPATA ENGINEERING challenged our engineers and scientists, which included robotics expertise from Carnegie Mellon University, to design a solution to meet our client's requirements for rapid digital geophysical and radiological data collection of a munitions test range with no down-range personnel. A prime concern of the project was to minimize exposure of personnel to unexploded ordnance and radiation. The field season was limited by extreme heat, cold and snow. Geographical Information System (GIS) tools were used throughout this project to accurately define the limits of mapped areas, build a common mapping platform from various client products, track production progress, allocate resources and relate subsurface geophysical information to geographical features for use in rapidly reacquiring targets for investigation. We were hopeful that our platform could meet the proposed 35 acres per day, towing both a geophysical package and a radiological monitoring trailer. We held our breath and crossed our fingers as the autonomous Speedrower began to crawl across the playa lakebed. We met our proposed production rate, and we averaged just less than 50 acres per 12-hour day using the autonomous platform with a path tracking error of less than +/- 4 inches. Our project team mapped over 1,800 acres in an 8-week (4 days per week) timeframe. The expertise of our partner, Carnegie Mellon University, was recently demonstrated when their two autonomous vehicle entries finished second and third at the 2005 Defense Advanced Research Projects Agency (DARPA) Grand Challenge. 'The Grand Challenge program was established to help foster the development of autonomous vehicle technology that will some day help save the lives of Americans who are protecting our country on the battlefield', said DARPA Grand Challenge Program Manager, Ron Kurjanowicz. Our autonomous remote-controlled vehicle (ARCV) was a modified New Holland 2550 Speedrower retrofitted to allow the machine-actuated functions to be controlled by an onboard computer. The computer-controlled Speedrower was developed at Carnegie Mellon University to automate agricultural harvesting. Harvesting tasks require the vehicle to cover a field using minimally overlapping rows at slow speeds in a similar manner to geophysical data acquisition. The Speedrower had demonstrated its ability to perform as it had already logged hundreds of acres of autonomous harvesting. This project is the first use of autonomous robotic technology on a large-scale for geophysical surveying.

  3. TCAP Aluminium Dissolution Flowsheet Basis

    SciTech Connect (OSTI)

    PIERCE, ROBERTA.

    2004-03-01T23:59:59.000Z

    The Actinide Technology Section has proposed the use of an nitric acid HNO3 and potassium fluoride KF flowsheet for stripping palladium Pd from palladium-coated kieselguhr Pd/K and removing aluminum (Al) metal foam from the TCAP coils. The basis for the HNO3-KF flowsheet is drawn from many sources. A brief review of the sources will be presented. The basic flowsheet involves three process steps, each with its own chemistry.

  4. FACILITY WORKER TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    SHULTZ, M.V.

    2005-03-31T23:59:59.000Z

    This technical basis document was developed to support RPP-13033, ''Tank Farms Documented Safety Analysis (DSA). It describes the criteria and methodology for allocating controls to hazardous conditions with significant facility worker (FW) consequence and presents the results of the allocation. The criteria and methodology for identifying controls that address FW safety are in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''.

  5. Results of preconstruction surveys used as a management technique for conserving endangered species and their habitats on Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Kato, T.T.; O'Farrell, T.P.; Johnson, J.W.

    1985-08-01T23:59:59.000Z

    In 1976 an intensive program of petroleum production at maximum efficient rate was initiated on the US Department of Energy's (DOE) Naval Petroleum Reserve No. 1 (Elk Hills) in western Kern County, California. In a Biological Opinion required by the Endangered Species Act, the US Fish and Wildlife Service concluded that proposed construction and production activities may jeopardize the continued existence of the endangered San Joaquin kit fox, Vulpes macrotis mutica, and the blunt-nosed leopard lizard, Gambelia silus, inhabiting the Reserve. DOE committed itself to carrying out a compensation/mitigation plan to offset impacts of program activities on endangered species and their habitats. One compensation/mitigation strategy was to develop and implement preconstruction surveys to assess potential conflicts between proposed construction activities, and endangered species and their critical habitats, and to propose reasonable and prudent alternatives to avoid conflicts. Between 1980 and 1984, preconstruction surveys were completed for 296 of a total of 387 major construction projects encompassing 3590 acres. Fewer than 22% of the projects potentially conflicted with conservation of endangered species, and most conflicts were easily resolved by identifying sensitive areas that required protection. Only 8% of the projects received minor modification in their design or locations to satisfy conservation needs, and only three projects had to be completely relocated. No projects were cancelled or delayed because of conflicts with endangered species, and costs to conduct preconstruction surveys were minimal. 27 refs., 9 figs., 2 tabs.

  6. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2003-10-09T23:59:59.000Z

    This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSC and/or TSR-level controls.

  7. Gravitational lens modeling with basis sets

    E-Print Network [OSTI]

    Birrer, Simon; Refregier, Alexandre

    2015-01-01T23:59:59.000Z

    We present a strong lensing modeling technique based on versatile basis sets for the lens and source planes. Our method uses high performance Monte Carlo algorithms, allows for an adaptive build up of complexity and bridges the gap between parametric and pixel based reconstruction methods. We apply our method to a HST image of the strong lens system RXJ1131-1231 and show that our method finds a reliable solution and is able to detect substructure in the lens and source planes simultaneously. Using mock data we show that our method is sensitive to sub-clumps with masses four orders of magnitude smaller than the main lens, which corresponds to about $10^8 M_{\\odot}$, without prior knowledge on the position and mass of the sub-clump. The modelling approach is flexible and maximises automation to facilitate the analysis of the large number of strong lensing systems expected in upcoming wide field surveys. The resulting search for dark sub-clumps in these systems, without mass-to-light priors, offers promise for p...

  8. WESF natural phenomena hazards survey

    SciTech Connect (OSTI)

    Wagenblast, G.R., Westinghouse Hanford

    1996-07-01T23:59:59.000Z

    A team of engineers conducted a systematic natural hazards phenomena (NPH) survey for the 225-B Waste Encapsulation and Storage Facility (WESF). The survey is an assessment of the existing design documentation to serve as the structural design basis for WESF, and the Interim Safety Basis (ISB). The lateral force resisting systems for the 225-B building structures, and the anchorages for the WESF safety related systems were evaluated. The original seismic and other design analyses were technically reviewed. Engineering judgment assessments were made of the probability of NPH survival, including seismic, for the 225-B structures and WESF safety systems. The method for the survey is based on the experience of the investigating engineers,and documented earthquake experience (expected response) data.The survey uses knowledge on NPH performance and engineering experience to determine the WESF strengths for NPH resistance, and uncover possible weak links. The survey, in general, concludes that the 225-B structures and WESF safety systems are designed and constructed commensurate with the current Hanford Site design criteria.

  9. Two-Meter Temperature Surveys for Geothermal Exploration Project...

    Open Energy Info (EERE)

    being considered in this project. Initial results from two-meter temperature surveys on Navy managed land near Fallon, Nevada indicate the presence of several temperature...

  10. Information and communication technologies in downtown revitalization : an international survey

    E-Print Network [OSTI]

    McCabe, Kathleen (Kathleen Ann)

    2005-01-01T23:59:59.000Z

    The Technology & Downtown Revitalization International Study surveyed downtown management organizations in Canada, Europe, Japan, New Zealand, South Africa, and the United States regarding attitudes, challenges and utilization ...

  11. BASIS Set Exchange (BSE): Chemistry Basis Sets from the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) Basis Set Library

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Feller, D; Schuchardt, Karen L.; Didier, Brett T.; Elsethagen, Todd; Sun, Lisong; Gurumoorthi, Vidhya; Chase, Jared; Li, Jun

    The Basis Set Exchange (BSE) provides a web-based user interface for downloading and uploading Gaussian-type (GTO) basis sets, including effective core potentials (ECPs), from the EMSL Basis Set Library. It provides an improved user interface and capabilities over its predecessor, the EMSL Basis Set Order Form, for exploring the contents of the EMSL Basis Set Library. The popular Basis Set Order Form and underlying Basis Set Library were originally developed by Dr. David Feller and have been available from the EMSL webpages since 1994. BSE not only allows downloading of the more than 200 Basis sets in various formats; it allows users to annotate existing sets and to upload new sets. (Specialized Interface)

  12. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2005-03-03T23:59:59.000Z

    This document describes the qualitative evaluation of frequency and consequences for DST and SST representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant structures, systems and components (SSCs) and/or technical safety requirements (TSRs) were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support WP-13033, Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  13. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2005-02-18T23:59:59.000Z

    This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  14. A Survey of Systemic Risk Analytics

    E-Print Network [OSTI]

    Bisias, Dimitrios

    We provide a survey of 31 quantitative measures of systemic risk in the economics and finance literature, chosen to span key themes and issues in systemic risk measurement and management. We motivate these measures from ...

  15. Evaluation of Authorization Basis Management Systems and Processes...

    Broader source: Energy.gov (indexed) [DOE]

    iterative process with the laboratories, MHC analyzes the responses and modifies the tooling or the procedure to eliminate hazards or reduce them to acceptable levels. The HAR...

  16. Nuclear Safety Basis Program Review Overview and Management Oversight

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732onMake YourDepartment of EnergyNoticeFacility

  17. CNR GRADUATION SURVEY RESULTS Spring, 2000

    E-Print Network [OSTI]

    Management (19 graduates): 5 are looking for work 1 is taking time off 1 is planning to attend grad schoolCNR GRADUATION SURVEY RESULTS Spring, 2000 Received 131 completed surveys at graduation in May are looking for work 0 are taking time off 0 are planning to attend grad school 4 have found employment

  18. 2011 Annual Planning Summary for Office of Legacy Management...

    Office of Environmental Management (EM)

    Summary for Legacy Management (LM) 2013 Annual Planning Summary for the Office of Legacy Management 2012 Independent Communication and Outreach Stakeholder Satisfaction Survey...

  19. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01T23:59:59.000Z

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  20. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01T23:59:59.000Z

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  1. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01T23:59:59.000Z

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  2. Preliminary survey report: evaluation of brake-drum service controls at Pennsylvania Bureau of Vehicle Management, Vehicle Maintenance Division, Harrisburg, Pennsylvania

    SciTech Connect (OSTI)

    Van Wagenen, H.D.

    1987-03-01T23:59:59.000Z

    Exposure to asbestos during the servicing of brakes on state-owned vehicles at the Bureau of Vehicle Management Maintenance Division, Harrisburg, Pennsylvania, was investigated as part of a study of control technologies. Brakes had been serviced at this garage facility for the previous year using a BCE-1000 Clayton brake-cleaning unit, sized for cars, vans, and pickups. The brake-cleaning unit consisted of a transparent enclosure hood and a HEPA vacuum filter dust collector, designed to contain and collect all brake-lining dust during vehicular brake maintenance and replacement. The authors conclude that the Clayton BCE-1000 dust-control unit appeared to be effective in containing and collecting brake dust during all vehicular brake maintenance and replacement jobs in this situation.

  3. Governing Change: An Institutional Geography of Rural Land Use, Environmental Management, and Change in the North Coastal Basin of California

    E-Print Network [OSTI]

    Short, Anne Garrity

    2010-01-01T23:59:59.000Z

    management plans appropriate for local conditions. During the preparation of the harvest plan, the RPF surveys

  4. Revenue Management: Research Overview and Prospects

    E-Print Network [OSTI]

    research directions. The survey includes a glossary of revenue management terminology and a bibliography for the survey to follow. More detailed accounts of the origins of rev- enue management can be found in BELOBABARevenue Management: Research Overview and Prospects JEFFREY I. MCGILL Queen's University, School

  5. January 2013 Annual Role and Responsibility Survey

    E-Print Network [OSTI]

    entered into a Conflict of Interest Management Plan or who are otherwise required as a conditionJanuary 2013 Annual Role and Responsibility Survey The State of Colorado, the Board of Governors the institution? Yes No CEMML 1490 WCNR #12;January 2013 3. Supervision/Management of Employees: Do you have

  6. Nutrient Management Examination Competency Areas Individual Specialists

    E-Print Network [OSTI]

    Guiltinan, Mark

    Management: Soil Health 2. Understand how to use soil survey data and maps in nutrient management planning and experience relating to nutrient management planning and plan development. These competency areas function Management Act (Act 38): Who Is Affected? 3. Know the required components of a nutrient management plan

  7. OPERATIONS MANAGEMENT Spring 2008

    E-Print Network [OSTI]

    Almor, Amit

    the operations and supply chain strategy. This survey course in operations management introduces students1 MGSC 395 OPERATIONS MANAGEMENT Spring 2008 Course Syllabus Instructor: Professor Anand Nair Class MATERIALS Required Text Books Textbook: Krajewski, Lee, Ritzman, Larry, and Malhotra, Manoj. Operations

  8. The US Geological Survey-Bureau of Land Management cultural resources program in the National Petroleum Reserve in Alaska, 1977-1981

    SciTech Connect (OSTI)

    Hall, E.S. Jr.; Gal, R.

    1989-01-01T23:59:59.000Z

    Utilization of northern Alaska's riches long predates the recent oil exploration program in the National Petroleum Reserve in Alaska (NPRA). Though the earliest known archaeological site in the reserve dates back only 7600 yr, most archaeologists believe human groups first occupied the area at least 4000 yr earlier. The as-yet-undiscovered physical remains left behind by these first inhabitants of the area, as well as the known and unknown traces of the peoples who succeeded them through time, constitute the cultural resources of the NPRA. First among the laws protecting cultural resources is the Antiquities Act of 1906, which provides for the establishment of national monuments by Presidential proclamation, sets up a permit system for the scientific investigation of cultural resources on Federal land, and details penalities for unauthorized disturbance of archaeological remains. The Archaeological and Historic Preservation Act of 1974, which extended the earlier Reservoir Salvage Act of 1960, authorizes funds for the preservation of historical and archaeological data that otherwise might be lost through any Federal construction project or federally licensed or assisted activity or program. The National Historic Preservation Act of 1966 established the National Register of Historic Places and a National Advisory Council to assist all Federal agencies in evaluating the effects of their actions on properties included, or eligible for inclusion, in the National Register. Finally, Executive Order 11593 of May 13, 1971, requires all Federal agencies to inventory cultural resources on lands they manage or affect in order to determine eligibility for the National Register, and to use due caution in regard to those resources until the inventory, evaluation, and nomination processes are completed. The oil exploration program in the NPRA is subject to this body of law for cultural resource protection.

  9. 324 Building safety basis criteria document

    SciTech Connect (OSTI)

    STEFFEN, J.M.

    1999-06-02T23:59:59.000Z

    The Safety Basis Criteria document describes the proposed format, content, and schedule for the preparation of an updated Safety Analysis Report (SAR) and Operational Safety Requirements document (OSR) for the 324 Building. These updated safety authorization basis documents are intended to cover stabilization and deactivation activities that will prepare the facility for turnover to the Environmental Restoration Contractor for final decommissioning. The purpose of this document is to establish the specific set of criteria needed for technical upgrades to the 324 Facility Safety Authorization Basis, as required by Project Hanford Procedure HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval.

  10. AN APPROACH TO SAFETY DESIGN BASIS DOCUMENTATION CHANGE CONTROL

    SciTech Connect (OSTI)

    RYAN GW

    2008-05-15T23:59:59.000Z

    This paper describes a safety design basis documentation change control process. The process identifies elements that can be used to manage the project/facility configuration during design evolution through the Initiation, Definition, and Execution project phases. The project phases addressed by the process are defined in US Department of Energy (DOE) Order (O) 413.3A, Program and Project Management for the Acquisition of Capital Assets, in support of DOE project Critical Decisions (CD). This approach has been developed for application to two Hanford Site projects in their early CD phases and is considered to be a key element of safety and design integration. As described in the work that has been performed, the purpose of change control is to maintain consistency among design requirements, the physical configuration, related facility documentation, and the nuclear safety basis during the evolution of the design. The process developed (1) ensures an appropriate level of rigor is applied at each project phase and (2) is considered to implement the requirements and guidance provided in DOE-STD-1189-2008, Integration of Safety into the Design Process. Presentation of this work is expected to benefit others in the DOE Complex that may be implementing DOE-STD-1189-2008 or managing nuclear safety documentation in support of projects in-process.

  11. Management of a federally listed plant species in the highway right of way

    E-Print Network [OSTI]

    Carey, Marion

    2003-01-01T23:59:59.000Z

    of the management plan was to conduct a survey of the canyonmanagement plan to cover necessary highway maintenance activities. U.S. Geological Surveys

  12. CRAD, Engineering Design and Safety Basis - December 22, 2009...

    Broader source: Energy.gov (indexed) [DOE]

    Engineering Design and Safety Basis - December 22, 2009 CRAD, Engineering Design and Safety Basis - December 22, 2009 December 22, 2009 Engineering Design and Safety Basis...

  13. Management Plan Management Plan

    E-Print Network [OSTI]

    Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids

  14. 2010 Employee Survey Acknowledgements

    E-Print Network [OSTI]

    Eisen, Michael

    conducted for Postdocs and Operations employees; this year's survey was a Lab-wide survey of the Lab2010 Employee Survey May 2010 #12;Acknowledgements TheBerkeleyLab Survey Team consisted Associates has conducted a number of large-scale surveys for organizations in higher education, including MIT

  15. Centre de recherche SRI ANALYSIS AND ASSET MANAGEMENT

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    survey - French Asset Management industry - Mainstreaming - Socially Responsible Investments (SRI) RESUMECentre de recherche SRI ANALYSIS AND ASSET MANAGEMENT: INDEPENDENT OR CONVERGENT? A FIELD STUDY of the authors. - DR 10006 - SRI Analysis and Asset Management: Independent or Convergent? A Field Study

  16. Literature survey

    SciTech Connect (OSTI)

    Pillay, K.K.S. (Los Alamos National Lab., Los Alamos, NM (US))

    1988-07-01T23:59:59.000Z

    The residential amount(s) of fissionable materials remaining in process equipment after the runout of bulk materials processed is referred to as ''Process Holdup of Special Nuclear Materials.'' Locating regions of holdup and estimating the quantity of fissile materials remaining as holdup are important not only to materials accountability but also to process safety. Holdup is often referred to as a ''Hidden Inventory.'' In materials accounting terminology, hidden inventories are part of ''Materials Unaccounted For'' (MUF) or ''Inventory Difference'' (ID). MUF or ID could be construed as ''Loss'' or ''Diversion''. From a safeguards perspective, all these designations are undesirable. Another terminology that is relevant to holdup is ''In-Process Inventory.'' During process operations and temporary shutdown, the holdup within the facility is also known as the in-process inventory. Estimating this inventory is just as challenging as residuals after process runout. The role of hidden inventories, or holdup, as a safeguards problem is now recognized by almost everyone interested in establishing effective safeguards for special nuclear materials. As part of this effort to organize the first INMM-sponsored Technical Workshop on Process Holdup of Special Nuclear Materials, an attempt was made to update an earlier survey of open literature publications of relevance to holdup. An attempt was made to exclude from this list those documents recognized as internal documents, progress reports, preliminary reports, abstracts, etc.

  17. CRAD, Safety Basis - Los Alamos National Laboratory Waste Characteriza...

    Office of Environmental Management (EM)

    Safety Basis - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Safety Basis - Los Alamos National Laboratory Waste...

  18. LRRB Pavement Management Systems Pavement Management Systems

    E-Print Network [OSTI]

    Minnesota, University of

    Survey: who is using what · Details about specific software/use · Case studies #12;Report (continued) Key Outcome ­ Matrix #12;Report (continued) Key Outcome ­ Case Studies (15 agencies) § Various levels of use Pavement Management Systems Workshop outline 1. Overview 2. Benefits 3. Elements 4. Case Studies 5

  19. Copositive Programming – a Survey

    E-Print Network [OSTI]

    2010-11-01T23:59:59.000Z

    Copositive Programming – a Survey. Mirjam Dür ... The purpose of this survey is to introduce the ...... Methods of Operations Research 62(1990): 45–52.

  20. 222-S Laboratory interim safety basis

    SciTech Connect (OSTI)

    WEAVER, L.L.

    2001-09-10T23:59:59.000Z

    The purpose of this document is to establish the Interim Safety Basis (ISB) for the 222-S Laboratory. An ISB is a documented safety basis that provides the justification for the continued operation of the facility until an upgraded documented safety analysis (DSA) is prepared in compliance with 10CFR 830, Subpart B. The 222-S Laboratory ISB is based on revised facility and process descriptions and revised accident analyses that reflect current conditions.

  1. A Radiological Survey Approach to Use Prior to Decommissioning: Results from a Technology Scanning and Assessment Project Focused on the Chornobyl NPP

    SciTech Connect (OSTI)

    Milchikov, A.; Hund, G.; Davidko, M.

    1999-10-20T23:59:59.000Z

    The primary objectives of this project are to learn how to plan and execute the Technology Scanning and Assessment (TSA) approach by conducting a project and to be able to provide the approach as a capability to the Chernobyl Nuclear Power Plant (ChNPP) and potentially elsewhere. A secondary objective is to learn specifics about decommissioning and in particular about radiological surveying to be performed prior to decommissioning to help ChNPP decision makers. TSA is a multi-faceted capability that monitors and analyzes scientific, technical, regulatory, and business factors and trends for decision makers and company leaders. It is a management tool where information is systematically gathered, analyzed, and used in business planning and decision making. It helps managers by organizing the flow of critical information and provides managers with information they can act upon. The focus of this TSA project is on radiological surveying with the target being ChNPP's Unit 1. This reactor was stopped on November 30, 1996. At this time, Ukraine failed to have a regulatory basis to provide guidelines for nuclear site decommissioning. This situation has not changed as of today. A number of documents have been prepared to become a basis for a combined study of the ChNPP Unit 1 from the engineering and radiological perspectives. The results of such a study are expected to be used when a detailed decommissioning plan is created.

  2. Range Con: a management evaluation system for assessing sucess of selected range improvement practices

    E-Print Network [OSTI]

    Ekblad, Steven Linn

    1989-01-01T23:59:59.000Z

    strategic resource management plans. Individual management skills and managerial environment have not been considered when predicting biological and economic response of range management practices. Risk for individual managers adopting unsuited... APPENDIX Prototype Range Management Skills Survey. Range Management Skills Survey Survey Data Tables. Validation Figures. VITA 64 65 74 92 104 106 1X LIST OP FIGURES FIGURE Page 1. The Range Con expert system in relation to the Resource...

  3. Texas camelid health and management survey

    E-Print Network [OSTI]

    Jacklitsch, Brenda Louise

    2009-06-02T23:59:59.000Z

    2.1 Camelid Background Llamas and alpacas have gained much popularity in recent years. This may be occurring as more people from urban areas decide to move to rural areas for the purpose of having a more laid back lifestyle. Approximately 100... to lack power, so the use of multiple tests was needed to look for patterns of clustering. ArcGIS Spatial Tools4 was used to run the spatial analysis tests. Moran?s autocorrelation was used to measure spatial dependence of disease prevalence. Getis...

  4. Management decisions for cogeneration : a survey analysis

    E-Print Network [OSTI]

    Radcliffe, Robert R.

    1982-01-01T23:59:59.000Z

    This study explores the underlying factors in the decision by private, private non-profit, and public sector facility owners to invest in cogeneration technology. It employs alpha factor analysis techniques to develop ...

  5. REPORT OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN

    Broader source: Energy.gov (indexed) [DOE]

    REPORT OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN U.S. Department of Energy Office of Environmental Management & Office of Science Report of Survey of Oak Ridge...

  6. FLORISTICS LABORATORY CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS

    E-Print Network [OSTI]

    . A baseline floristic survey is an essential element for management of military lands. This information, and supports adequate training sites. The Center conducts comprehensive planning level surveys to document conservation measures. In addition invasive plants are documented to aid in land management decisions. Surveys

  7. Managing talent flow. 2006 Energy and Resources

    E-Print Network [OSTI]

    and market growth in mining, utilities, oil and gas have been relatively stagnant, prompting many youngManaging talent flow. 2006 Energy and Resources Talent Pulse Survey Report Consulting #12;Executive ................................................................ 13 Contents #12;1 Managing talent flow 2006 Energy and Resources Talent Pulse Survey Report 2006

  8. Cloud Data Management (CDM) Yunpeng Chai

    E-Print Network [OSTI]

    /W performance / Parallelism No/ Simple SQL operations 12 /26 Survey of CDM Cloud Storage: Architecture: Master#12;Cloud Data Management (CDM) Yunpeng Chai 2 /26 Outline Motivation of CDM Survey of CDM IBM SUR Cloud China Mobile National Health Care #12;9 /26 Outline Motivation of CDM Survey of CDM IBM SUR Cloud

  9. Analysis of Assembly Bill 264: Pediatric Asthma Self-Management Training and Education Services

    E-Print Network [OSTI]

    California Health Benefits Review Program (CHBRP)

    2006-01-01T23:59:59.000Z

    management and education services was obtained from the 2001 CHIS Survey.management training and education services in Knox-Keene licensed plans in California was determined by a survey

  10. STEP Participant Survey Report

    Broader source: Energy.gov [DOE]

    STEP Participant Survey Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  11. Field Survey of Cactus Crater Storage Facility (Runit Dome)

    SciTech Connect (OSTI)

    Douglas Miller, Terence Holland

    2008-10-31T23:59:59.000Z

    The US Department of Energy, Office of Health and Safety (DOE/HS-10), requested that National Security Technologies, LLC, Environmental Management directorate (NSTec/EM) perform a field survey of the Cactus Crater Storage Facility (Runit Dome), similar to past surveys conducted at their request. This field survey was conducted in conjunction with a Lawrence Livermore National Laboratory (LLNL) mission on Runit Island in the Enewetak Atoll in the Republic of the Marshall Islands (RMI). The survey was strictly a visual survey, backed up by digital photos and a written description of the current condition.

  12. Technical basis document for natural event hazards

    SciTech Connect (OSTI)

    CARSON, D.M.

    2003-08-28T23:59:59.000Z

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for natural event hazard (NEH)-initiated accidents. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls This report documents the technical basis for assigning risk bins for Natural Event Hazards Representative Accident and associated represented hazardous conditions.

  13. A Computational Study and Survey of Methods for the Single-Row ...

    E-Print Network [OSTI]

    2012-04-17T23:59:59.000Z

    For further details on this subject see also the recent survey of (SRFLP) by. Anjos and Liers ...... Operations Research & Management Science. Springer-Verlag ...

  14. CRAD, Safety Basis- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Safety Basis portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  15. CRAD, Safety Basis- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Safety Basis in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  16. CRAD, Safety Basis- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Safety Basis portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  17. CRAD, Safety Basis- Y-12 Enriched Uranium Operations Oxide Conversion Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January 2005 assessment of the Safety Basis at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility.

  18. LESAM 2007 -2nd Leading Edge Conference on Strategic Asset Management Lisbon, Portugal .:. 17 19 October

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    October Sewer asset management: from visual inspection survey to dysfunction indicators 1 Sewer asset management: from visual inspection survey to dysfunction indicators M. Ibrahim* , F. Cherqui* , P. Le Gauffre, Portugal .:. 17 ­ 19 October Sewer asset management: from visual inspection survey to dysfunction

  19. Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological

    E-Print Network [OSTI]

    Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey;#12;Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014: U.S. Geological

  20. PRELIMINARY SELECTION OF MGR DESIGN BASIS EVENTS

    SciTech Connect (OSTI)

    J.A. Kappes

    1999-09-16T23:59:59.000Z

    The purpose of this analysis is to identify the preliminary design basis events (DBEs) for consideration in the design of the Monitored Geologic Repository (MGR). For external events and natural phenomena (e.g., earthquake), the objective is to identify those initiating events that the MGR will be designed to withstand. Design criteria will ensure that radiological release scenarios resulting from these initiating events are beyond design basis (i.e., have a scenario frequency less than once per million years). For internal (i.e., human-induced and random equipment failures) events, the objective is to identify credible event sequences that result in bounding radiological releases. These sequences will be used to establish the design basis criteria for MGR structures, systems, and components (SSCs) design basis criteria in order to prevent or mitigate radiological releases. The safety strategy presented in this analysis for preventing or mitigating DBEs is based on the preclosure safety strategy outlined in ''Strategy to Mitigate Preclosure Offsite Exposure'' (CRWMS M&O 1998f). DBE analysis is necessary to provide feedback and requirements to the design process, and also to demonstrate compliance with proposed 10 CFR 63 (Dyer 1999b) requirements. DBE analysis is also required to identify and classify the SSCs that are important to safety (ITS).

  1. The Equitable Basis for sl_2

    E-Print Network [OSTI]

    Benkart, Georgia

    2008-01-01T23:59:59.000Z

    This article contains an investigation of the equitable basis for the Lie algebra sl_2. Denoting this basis by {x,y,z}, we have [x,y] = 2x + 2y, [y,z] = 2y + 2z, [z, x] = 2z + 2x. One focus of our study is the group of automorphisms G generated by exp(ad x*), exp(ad y*), exp(ad z*), where {x*,y*,z*} is the basis for sl_2 dual to {x,y,z} with respect to the trace form (u,v) = tr(uv). We show that G is isomorphic to the modular group PSL_2(Z). Another focus of our investigation is the lattice L=Zx+Zy+Zz. We prove that the orbit G(x) equals {u in L |(u,u)=2}. We determine the precise relationship between (i) the group G, (ii) the group of automorphisms for sl_2 that preserve L, (iii) the group of automorphisms and antiautomorphisms for sl_2 that preserve L, and (iv) the group of isometries for (,) that preserve L. We obtain analogous results for the lattice L* =Zx*+Zy*+Zz*. Relative to the equitable basis, the matrix of the trace form is a Cartan matrix of hyperbolic type; consequently,we identify the equitable ...

  2. Technical basis document for external events

    SciTech Connect (OSTI)

    OBERG, B.D.

    2003-03-22T23:59:59.000Z

    This document supports the Tank Farms Documented Safety Analysis and presents the technical basis for the frequencies of externally initiated accidents. The consequences of externally initiated events are discussed in other documents that correspond to the accident that was caused by the external event. The external events include aircraft crash, vehicle accident, range fire, and rail accident.

  3. Waste transfer leaks technical basis document

    SciTech Connect (OSTI)

    ZIMMERMAN, B.D.

    2003-03-22T23:59:59.000Z

    This document provides technical support for the onsite radiological and toxicological, and offsite toxicological, portions of the waste transfer leak accident presented in the Documented Safety Analysis. It provides the technical basis for frequency and consequence bin selection, and selection of safety SSCs and TSRs.

  4. A Qualitative Survey of Modern Software Transactional Memory Systems

    E-Print Network [OSTI]

    Scott, Michael L.

    A Qualitative Survey of Modern Software Transactional Memory Systems Virendra J. Marathe present a qualitative survey of modern STM systems that support dynamic transactions. More concretely, we management versus helping. This work was supported in part by NSF grants numbers EIA-0080124, CCR-9988361

  5. HOME OF THE ILLINOIS STATE SCIENTIFIC SURVEYS Illinois Natural History Survey Illinois State Archaeological Survey Illinois State

    E-Print Network [OSTI]

    Bashir, Rashid

    Archaeological Survey · Illinois State Geological Survey · Illinois State Water Survey · Illinois Sustainable

  6. A Survey on Mining Software Survey Presentation

    E-Print Network [OSTI]

    Bae, Doo-Hwan

    ­ Effort Estimation ­ Mining Aspects · Papers at a glance · Related Workshop · Available Resources of mining software archives to support, ­ the maintenance of software systems, ­ improve software designA Survey on Mining Software Archives Survey Presentation Jin Ung, Oh ­ 2007.07.11 #12;Contents

  7. Contamination surveys for release of material

    SciTech Connect (OSTI)

    Durham, J.S.; Johnson, M.L. [Pacific Northwest Lab., Richland, WA (United States); Gardner, D.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-05-01T23:59:59.000Z

    This report describes, and presents the technical basis for, a methodology for performing instrument surveys to release material from radiological control, including release to controlled areas and release from radiological control. The methodology is based on a fast scan survey, a large-area wipe survey, and a series of statistical, fixed measurements. The methodology meets the requirements of the US Department of Energy Radiological Control Manual (RadCon Manual) (DOE 1994) and DOE Order 5400.5 (DOE 1990) for release of material in less time than is required by a conventional scan survey. Implementation of the proposed methodology with a confidence interval of 67% will meet the material release requirements. The material evaluation process will allow material that has not been exposed to contamination to be released from radiological control without a survey. For potential radioactive contaminants that are not reserved in DOE Order 5400.5, the methodology will allow material to be released from radiological control. For other radionuclides, with the exception of some difficult-to-detect radionuclides, material may be released for controlled use. Compared with current techniques, the proposed methodology will reduce the amount of time required to perform surveys.

  8. MASTER OF SCIENCE DEGREES IN Risk Management

    E-Print Network [OSTI]

    Johnson Jr.,, Ray

    MASTER OF SCIENCE DEGREES IN Risk Management About Queens College Often referred to as "the jewel, quantify, mitigate, and transfer it. This is true not just for risk managers but also for accountants, finance professionals, actuaries, and others who make risk-management decisions on a daily basis

  9. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  10. Technical Cost Modeling - Life Cycle Analysis Basis for Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Life Cycle Analysis Basis for Program Focus Technical Cost Modeling - Life Cycle Analysis Basis for Program Focus Polymer Composites Research in the LM Materials Program Overview...

  11. Systematic expansion for infrared oscillator basis extrapolations

    E-Print Network [OSTI]

    R. J. Furnstahl; S. N. More; T. Papenbrock

    2014-03-20T23:59:59.000Z

    Recent work has demonstrated that the infrared effects of harmonic oscillator basis truncations are well approximated by imposing a partial-wave Dirichlet boundary condition at a properly identified radius L. This led to formulas for extrapolating the corresponding energy E_L and other observables to infinite L and thus infinite basis size. Here we reconsider the energy for a two-body system with a Dirichlet boundary condition at L to identify and test a consistent and systematic expansion for E_L that depends only on observables. We also generalize the energy extrapolation formula to nonzero angular momentum, and apply it to the deuteron. Formulas given previously for extrapolating the radius are derived in detail.

  12. TECHNICAL BASIS DOCUMENT FOR NATURAL EVENT HAZARDS

    SciTech Connect (OSTI)

    KRIPPS, L.J.

    2006-07-31T23:59:59.000Z

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for natural event hazard (NEH)-initiated accidents. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls.

  13. Technical basis document for natural event hazards

    SciTech Connect (OSTI)

    CARSON, D.M.

    2003-03-20T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process and the technical basis for assigning risk bins for natural event hazards (NEH)-initiated representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  14. Chopped random-basis quantum optimization

    E-Print Network [OSTI]

    Tommaso Caneva; Tommaso Calarco; Simone Montangero

    2011-08-22T23:59:59.000Z

    In this work we describe in detail the "Chopped RAndom Basis" (CRAB) optimal control technique recently introduced to optimize t-DMRG simulations [arXiv:1003.3750]. Here we study the efficiency of this control technique in optimizing different quantum processes and we show that in the considered cases we obtain results equivalent to those obtained via different optimal control methods while using less resources. We propose the CRAB optimization as a general and versatile optimal control technique.

  15. Environmental Survey preliminary report, Fermi National Accelerator Laboratory, Batavia, Illinois

    SciTech Connect (OSTI)

    Not Available

    1988-10-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Fermi National Accelerator Laboratory (Fermilab), conducted September 14 through 25, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual participants for the Survey team are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Fermilab. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Fermilab, and interviews with site personnel. 110 refs., 26 figs., 41 tabs.

  16. Implementing an Energy Management Strategy for a Houston Refinery

    E-Print Network [OSTI]

    Wood, S. C.; Agrawal, R. K.; Canon, D.

    and maintained energy management program translates to PROFIT added directly to the BOTTOM LINE. Woodward-Clyde Consultants (WCC) recently implemented and energy management program at the Lyondell-Citgo Refinery in Houston, Texas. The basis of the program...

  17. Independent Oversight Review of the Emergency Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    that ammonia is no longer stored onsite and is appropriately excluded from the hazards survey, indicating that the NETL emergency management program could be an OE base program....

  18. Responding to Congestion and Traffic Growth: Transportatoin Demand Management

    E-Print Network [OSTI]

    Giuliano, Genevieve; Wachs, Martin

    1992-01-01T23:59:59.000Z

    survey of employees;absenceof a properly certified ETC;absenceof a letter from management committing itself to the implementation the plan;

  19. Humboldt Bay Initiative: Adaptive Management in a Changing World

    E-Print Network [OSTI]

    Schlosser, Susan

    2009-01-01T23:59:59.000Z

    survey (BMI) Strategy F Support Integrated Forest Management This strategy will promote better environmental outcomes and economic efficiency through longer term forest plans

  20. COLORADO SCHOOL OF MINES PERFORMANCE MANAGEMENT PROGRAM

    E-Print Network [OSTI]

    , managers, and other affected parties, · Emphasizes planning, management, and evaluation of employee1 COLORADO SCHOOL OF MINES PERFORMANCE MANAGEMENT PROGRAM Revised October 1, 2008 I. HISTORY Since salaries were adjusted based on prevailing wages as determined by a salary survey, with merit increases

  1. Facing Complexity in Systems Management Metin Feridun

    E-Print Network [OSTI]

    Boyer, Edmond

    . This keynote will survey some of these systems management issues and the emerging approaches to solving themFacing Complexity in Systems Management Metin Feridun IBM Research -- Zurich Säumerstrasse 4 CH to the Internet, are creating new and exciting challenges to the management of IT (Information Technology

  2. Crop Management and Diagnostic Clinic IMPACT REPORT

    E-Print Network [OSTI]

    Farritor, Shane

    management. The response rate to the survey was 23% and in- cluded: 127 agricultural advisors influencingCrop Management and Diagnostic Clinic IMPACT REPORT University of Nebraska­Lincoln * Institute profitability and protect the environment through research-based management practices. Partnership The Crop

  3. Authorization in Trust Management: Features and Foundations

    E-Print Network [OSTI]

    Skalka, Christian

    ]. In this paper we survey state-of-the-art in trust management authorization, with an emphasis on formally wellAuthorization in Trust Management: Features and Foundations Peter C. Chapin University of Vermont and Christian Skalka University of Vermont and X. Sean Wang University of Vermont Trust management systems

  4. Lancaster University Management School Working Paper

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Lancaster University Management School Working Paper 2007/027 The relationship between vehicle routing and scheduling and green logistics - a literature survey Abdelkader Sbihi and Richard William Eglese The Department of Management Science Lancaster University Management School Lancaster LA1 4YX UK

  5. Management of Melaleuca by Residents in South Florida1 Katherine Carter-Finn, Alan W. Hodges, Donna J. Lee, and Michael T. Olexa2

    E-Print Network [OSTI]

    Florida, University of

    -Chancy, Interim Dean The Melaleuca Management Survey To assess the current situation and management practices with the USDA-Agricultural Research Service and the South Florida Water Management District. Surveys were for professional managers, FE671). For residents, a survey was used to gather information on the extent

  6. Environmental Survey preliminary report

    SciTech Connect (OSTI)

    Not Available

    1988-04-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Sandia National Laboratories conducted August 17 through September 4, 1987. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Sandia National Laboratories-Albuquerque (SNLA). The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SNLA, and interviews with site personnel. 85 refs., 49 figs., 48 tabs.

  7. 2009 Operations Employee Climate Survey

    E-Print Network [OSTI]

    2009 Operations Employee Climate Survey March 2009 #12;Acknowledgements TheBerkeleyLab Survey Team Associates has conducted a number of large-scale surveys for organizations in higher education, including MIT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Survey

  8. Infrared Surveys for AGN

    E-Print Network [OSTI]

    Harding E. Smith

    2002-03-06T23:59:59.000Z

    From the earliest extragalactic infrared studies AGN have shown themselves to be strong infrared sources and IR surveys have revealed new populations of AGN. I briefly review current motivations for AGN surveys in the infrared and results from previous IR surveys. The Luminous Infrared Galaxies, which in some cases house dust-enshrouded AGN, submillimeter surveys, and recent studies of the cosmic x-ray and infrared backgrounds suggest that there is a population of highly-obscured AGN at high redshift. ISO Surveys have begun to resolve the infrared background and may have detected this obscured AGN population. New infrared surveys, particularly the SIRTF Wide-area Infrared Extragalactic Legacy Survey (SWIRE), will detect this population and provide a platform for understanding the evolution of AGN, Starbursts and passively evolving galaxies in the context of large-scale structure and environment.

  9. Survey of thermal-hydraulic models of commercial nuclear power plants

    SciTech Connect (OSTI)

    Determan, J.C.; Hendrix, C.E.

    1992-12-01T23:59:59.000Z

    A survey of the thermal-hydraulic models of nuclear power plants has been performed to identify the NRC's current analytical capabilities for critical event response. The survey also supports ongoing research for accident management. The results of the survey are presented here. The PC database which records detailed data on each model is described.

  10. Survey of thermal-hydraulic models of commercial nuclear power plants

    SciTech Connect (OSTI)

    Determan, J.C.; Hendrix, C.E.

    1992-12-01T23:59:59.000Z

    A survey of the thermal-hydraulic models of nuclear power plants has been performed to identify the NRC`s current analytical capabilities for critical event response. The survey also supports ongoing research for accident management. The results of the survey are presented here. The PC database which records detailed data on each model is described.

  11. CULTURAL RESOURCES SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS

    E-Print Network [OSTI]

    D installations. SERVICES · Planning level surveys for archaeological resources, traditional cultural properties and structures · Integrated Cultural Resource Management Plans (ICRMPs) · Archaeological resource monitoringCULTURAL RESOURCES SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML | 1490

  12. Reduced Basis Method for Nanodevices Simulation

    SciTech Connect (OSTI)

    Pau, George Shu Heng

    2008-05-23T23:59:59.000Z

    Ballistic transport simulation in nanodevices, which involves self-consistently solving a coupled Schrodinger-Poisson system of equations, is usually computationally intensive. Here, we propose coupling the reduced basis method with the subband decomposition method to improve the overall efficiency of the simulation. By exploiting a posteriori error estimation procedure and greedy sampling algorithm, we are able to design an algorithm where the computational cost is reduced significantly. In addition, the computational cost only grows marginally with the number of grid points in the confined direction.

  13. Technical basis for internal dosimetry at Hanford

    SciTech Connect (OSTI)

    Sula, M.J.; Carbaugh, E.H.; Bihl, D.E.

    1991-07-01T23:59:59.000Z

    The Hanford Internal Dosimetry Program, administered by Pacific Northwest Laboratory for the US Department of Energy, provides routine bioassay monitoring for employees who are potentially exposed to radionuclides in the workplace. This report presents the technical basis for routine bioassay monitoring and the assessment of internal dose at Hanford. The radionuclides of concern include tritium, corrosion products ({sup 58}Co, {sup 60}Co, {sup 54}Mn, and {sup 59}Fe), strontium, cesium, iodine, europium, uranium, plutonium, and americium,. Sections on each of these radionuclides discuss the sources and characteristics; dosimetry; bioassay measurements and monitoring; dose measurement, assessment, and mitigation and bioassay follow-up treatment. 78 refs., 35 figs., 115 tabs.

  14. Structural Basis for Activation of Cholera Toxin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900SteepStrengthening northern NewStructural Basis for

  15. Structural Basis for Activation of Cholera Toxin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900SteepStrengthening northern NewStructural Basis

  16. Structural Basis for Activation of Cholera Toxin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900SteepStrengthening northern NewStructural BasisStructural

  17. NDRPProtocolTechBasisCompiled020705.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Saleshttp://www.fnal.gov/directorate/nalcal/nalcal02_07_05_files/nalcal.gif Directorate - Events - Fermilab atNovelNC π5,NDLGS:Basis

  18. Lake Chelan Fishery Management Plan Washington Department of Fish and Wildlife

    E-Print Network [OSTI]

    ........................................................... Monitoring changes in cutthroat and rainbow trout management........ Creel survey methods1 Appendix D Lake Chelan Fishery Management Plan Washington Department of Fish and Wildlife 2002 #12;2 LAKE CHELAN FISHERY MANAGEMENT PLAN TABLE OF CONTENTS ACKNOWLEDGEMENTS

  19. Setting clear expectations for safety basis development

    SciTech Connect (OSTI)

    MORENO, M.R.

    2003-05-03T23:59:59.000Z

    DOE-RL has set clear expectations for a cost-effective approach for achieving compliance with the Nuclear Safety Management requirements (10 CFR 830, Nuclear Safety Rule) which will ensure long-term benefit to Hanford. To facilitate implementation of these expectations, tools were developed to streamline and standardize safety analysis and safety document development resulting in a shorter and more predictable DOE approval cycle. A Hanford Safety Analysis and Risk Assessment Handbook (SARAH) was issued to standardized methodologies for development of safety analyses. A Microsoft Excel spreadsheet (RADIDOSE) was issued for the evaluation of radiological consequences for accident scenarios often postulated for Hanford. A standard Site Documented Safety Analysis (DSA) detailing the safety management programs was issued for use as a means of compliance with a majority of 3009 Standard chapters. An in-process review was developed between DOE and the Contractor to facilitate DOE approval and provide early course correction. As a result of setting expectations and providing safety analysis tools, the four Hanford Site waste management nuclear facilities were able to integrate into one Master Waste Management Documented Safety Analysis (WM-DSA).

  20. Template for NSF Data Management Plan In general, the data management plan should answer these two questions

    E-Print Network [OSTI]

    He, Chuan

    Template for NSF Data Management Plan In general, the data management plan should answer these two. Expected Data Describe the types of data, samples, physical collections, survey responses, interviews

  1. Utility FGD survey, January--December 1989

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. (IT Corp., Cincinnati, OH (United States))

    1992-03-01T23:59:59.000Z

    This is Volume 2 part 2, of the Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. This volume particularly contains basic design and performance data.

  2. Utility FGD Survey, January--December 1989

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. (IT Corp., Cincinnati, OH (United States))

    1992-03-01T23:59:59.000Z

    The Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company.

  3. Technical Basis for PNNL Beryllium Inventory

    SciTech Connect (OSTI)

    Johnson, Michelle Lynn

    2014-07-09T23:59:59.000Z

    The Department of Energy (DOE) issued Title 10 of the Code of Federal Regulations Part 850, “Chronic Beryllium Disease Prevention Program” (the Beryllium Rule) in 1999 and required full compliance by no later than January 7, 2002. The Beryllium Rule requires the development of a baseline beryllium inventory of the locations of beryllium operations and other locations of potential beryllium contamination at DOE facilities. The baseline beryllium inventory is also required to identify workers exposed or potentially exposed to beryllium at those locations. Prior to DOE issuing 10 CFR 850, Pacific Northwest Nuclear Laboratory (PNNL) had documented the beryllium characterization and worker exposure potential for multiple facilities in compliance with DOE’s 1997 Notice 440.1, “Interim Chronic Beryllium Disease.” After DOE’s issuance of 10 CFR 850, PNNL developed an implementation plan to be compliant by 2002. In 2014, an internal self-assessment (ITS #E-00748) of PNNL’s Chronic Beryllium Disease Prevention Program (CBDPP) identified several deficiencies. One deficiency is that the technical basis for establishing the baseline beryllium inventory when the Beryllium Rule was implemented was either not documented or not retrievable. In addition, the beryllium inventory itself had not been adequately documented and maintained since PNNL established its own CBDPP, separate from Hanford Site’s program. This document reconstructs PNNL’s baseline beryllium inventory as it would have existed when it achieved compliance with the Beryllium Rule in 2001 and provides the technical basis for the baseline beryllium inventory.

  4. Environmentally Sensitive Areas Surveys Program threatened and endangered species survey: Progress report. Environmental Restoration Program

    SciTech Connect (OSTI)

    King, A.L.; Awl, D.J.; Gabrielsen, C.A.

    1994-09-01T23:59:59.000Z

    The Endangered Species Act (originally passed in 1973) is a Federal statute that protects both animal and plant species. The Endangered Species Act identifies species which are, without careful management, in danger of becoming extinct and species that are considered threatened. Along with the designation of threatened or endangered, the Endangered Species Act provides for the identification of appropriate habitat for these species. Since 1993, the United States Department of Energy`s (DOE) Environmental Restoration (ER) Program has supported a program to survey the Oak Ridge Reservation (ORR) for threatened and endangered species. The Environmentally Sensitive Areas Surveys Program initiated vascular plant surveys during fiscal year 1993 and vertebrate animal surveys during fiscal year 1994 to determine the baseline condition of threatened and endangered species on the ORR at the present time. Data collected during these surveys are currently aiding Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Investigations on the ORR. They also provide data for ER and Waste Management decision documents, ensure that decisions have technical and legal defensibility, provide a baseline for ensuring compliance with principal legal requirements and will increase public confidence in DOE`s adherence to all related environmental resources rules, laws, regulations, and instructions. This report discusses the progress to date of the threatened and endangered species surveys of the ORR.

  5. 2009 Postdoc Survey Acknowledgements

    E-Print Network [OSTI]

    of the following: Paul Alivisatos, Sponsor Vera Potapenko, Project Lead Karen Ramorino, Project Manager Chris

  6. Surveys, Astrometric Follow-up & Population Statistics

    E-Print Network [OSTI]

    Jedicke, Robert; Micheli, Marco; Ryan, Eileen; Spahr, Timothy; Yeomans, Donald K

    2015-01-01T23:59:59.000Z

    Asteroid surveys are the backbone of asteroid science, and with this in mind we begin with a broad review of the impact of asteroid surveys on our field. We then provide a brief history of asteroid discoveries so as to place contemporary and future surveys in perspective. Surveys in the United States have discovered the vast majority of the asteroids and this dominance has been consolidated since the publication of Asteroids III. Our descriptions of the asteroid surveys that have been operational since that time are focussed upon those that have contributed the vast majority of asteroid observations and discoveries. We also provide some insight into upcoming next-generation surveys that are sure to alter our understanding of the small bodies in the inner solar system and provide evidence to untangle their complicated dynamical and physical histories. The Minor Planet Center, the nerve center of the asteroid discovery effort, has improved its operations significantly in the past decade so that it can manage th...

  7. ORISE: Characterization surveys

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extent of radiological contamination at sites scheduled for decontamination and decommissioning (D&D). A fundamental aspect of all D&D projects, characterization surveys provide...

  8. Environmental Survey preliminary report, Solar Energy Research Institute, Golden, Colorado

    SciTech Connect (OSTI)

    Not Available

    1988-10-01T23:59:59.000Z

    This report presents the preliminary findings of the first phase of the Environmental Survey of the US Department of Energy's (DOE) Solar Energy Research Institute (SERI), conducted December 14 through 18, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by private contractors. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SERI. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SERI, and interviews with site personnel. 33 refs., 22 figs., 21 tabs.

  9. Undergraduate Office of Career Management Undergraduate Newark -Office of Career Management

    E-Print Network [OSTI]

    Lin, Xiaodong

    Undergraduate Office of Career Management Undergraduate Newark - Office of Career Management, Media (20) *Based on responses from annual survey "If you secured an internship or co-op, what major does it relate to?" Accounting--32% (73) Supply Chain Management--21% (48) Marketing--17% (39) Finance

  10. Gatton College of Business and Economics MGT Management

    E-Print Network [OSTI]

    MacAdam, Keith

    . MGT 320 SURVEY OF HUMAN RESOURCE MANAGEMENT. (3) SurveyofthefieldofHumanResourceManagementGatton College of Business and Economics MGT Management KEY: # = new course * = course changed = course dropped University of Kentucky 2013-2014 Undergraduate Bulletin 1 MGT 301 BUSINESS MANAGEMENT. (3

  11. Disaster case management and individuals with disabilities

    E-Print Network [OSTI]

    Stough, Laura

    2010-01-01T23:59:59.000Z

    -two case managers and 12 case management supervisors from this program provided services to a collective caseload of 2,047 individuals with disabilities and their families. Interviews and telephone surveys were conducted with these participants 20 –24... management process is intended to be collaborative and includes “. . . assessment, planning, facilitation, care coordination, evaluation and advocacy for options and ser- vices . . .” (Case Management Society of America, 2010, p. 8). Other functions of case...

  12. Network Management Network Management

    E-Print Network [OSTI]

    that pertain to the operation, administration, maintenance, and provisioning of networked systems · Operation deals with keeping the network up (and the service provided by the network) · Administration involvesNetwork Management Pag. 1 Network Management Andrea Bianco Telecommunication Network Group Network

  13. Power System load management

    SciTech Connect (OSTI)

    Rudenko, Yu.N.; Semenov, V.A.; Sovalov, S.A.; Syutkin, B.D.

    1984-01-01T23:59:59.000Z

    The variation in demand nonuniformity is analyzed for the Unified Electric Power System of the USSR and certain interconnected power systems; the conditions for handling such nonuniformity with utilization of generating equipment having differing flexibility capabilities are also considered. On this basis approaches and techniques for acting on user loads, load management, in order to assure a balance between generated and consumed power are considered.

  14. XSEDE Cloud Survey Report

    E-Print Network [OSTI]

    Walter, M.Todd

    XSEDE Cloud Survey Report David Lifka, Cornell Center for Advanced Computing Ian Foster, ANL, ANL and The University of Chicago A National Science Foundation-sponsored cloud user survey was conducted from September 2012 to April 2013 by the XSEDE Cloud Integration Investigation Team to better

  15. Design Basis Threat | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management FermiDavid Turner David3Depth Profile RECORD

  16. Office of Nuclear Safety Basis and Facility Design

    Broader source: Energy.gov [DOE]

    The Office of Nuclear Safety Basis & Facility Design establishes safety basis and facility design requirements and expectations related to analysis and design of nuclear facilities to ensure protection of workers and the public from the hazards associated with nuclear operations.

  17. Nuclear Facility Safety Basis Fundamentals Self-Study Guide ...

    Broader source: Energy.gov (indexed) [DOE]

    Oak Ridge Operations Office Nuclear Facility Safety Basis Fundamentals Self-Study Guide Fulfills ORO Safety Basis Competency 1, 2 (Part 1), or 7 (Part 1) November 2002 Nuclear...

  18. CRAD, Integrated Safety Basis and Engineering Design Review ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Basis and Engineering Design Review - August 20, 2014 (EA CRAD 31-4, Rev. 0) CRAD, Integrated Safety Basis and Engineering Design Review - August 20, 2014 (EA...

  19. Authorization basis status report (miscellaneous TWRS facilities, tanks and components)

    SciTech Connect (OSTI)

    Stickney, R.G.

    1998-04-29T23:59:59.000Z

    This report presents the results of a systematic evaluation conducted to identify miscellaneous TWRS facilities, tanks and components with potential needed authorization basis upgrades. It provides the Authorization Basis upgrade plan for those miscellaneous TWRS facilities, tanks and components identified.

  20. Environmental Survey preliminary report, Pittsburgh Energy Technology Center, Pittsburgh, Pennsylvania

    SciTech Connect (OSTI)

    Not Available

    1988-09-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Pittsburgh Energy Technology Center (PETC) conducted December 7--11, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with PETC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at PETC, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain environmental problems identified during its on-site Survey activities at PETC. The S A Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the Plan's results will be incorporated into the PETC Survey findings for inclusion into the Environmental Survey Summary Report. 64 refs., 23 figs., 29 tabs.

  1. Building Technologies Residential Survey

    SciTech Connect (OSTI)

    Secrest, Thomas J.

    2005-11-07T23:59:59.000Z

    Introduction A telephone survey of 1,025 residential occupants was administered in late October for the Building Technologies Program (BT) to gather information on residential occupant attitudes, behaviors, knowledge, and perceptions. The next section, Survey Results, provides an overview of the responses, with major implications and caveats. Additional information is provided in three appendices as follows: - Appendix A -- Summary Response: Provides summary tabular data for the 13 questions that, with subparts, comprise a total of 25 questions. - Appendix B -- Benchmark Data: Provides a benchmark by six categories to the 2001 Residential Energy Consumption Survey administered by EIA. These were ownership, heating fuel, geographic location, race, household size and income. - Appendix C -- Background on Survey Method: Provides the reader with an understanding of the survey process and interpretation of the results.

  2. 2013 REPORT ILLINOIS NATURAL HISTORY SURVEY

    E-Print Network [OSTI]

    Bashir, Rashid

    2013 REPORT ILLINOIS NATURAL HISTORY SURVEY ILLINOIS STATE ARCHAEOLOGICAL SURVEY ILLINOIS STATE State Geological Survey Illinois State Water Survey Illinois Sustainable Technology Center Awards GEOLOGICAL SURVEY ILLINOIS STATE WATER SURVEY ILLINOIS SUSTAINABLE TECHNOLOGY CENTER #12;#12;PRAIRIE RESEARCH

  3. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect (OSTI)

    GARVIN, L J; JENSEN, M A

    2004-04-13T23:59:59.000Z

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  4. Comparison of spent nuclear fuel management alternatives

    SciTech Connect (OSTI)

    Beebe, C.L.; Caldwell, M.A,

    1996-09-01T23:59:59.000Z

    This paper reports the process an results of a trade study of spent nuclear fuel (SNF)management alternatives. The purpose of the trade study was to provide: (1) a summary of various SNF management alternatives, (2) an objective comparison of the various alternatives to facilitate the decision making process, and (3) documentation of trade study rational and the basis for decisions.

  5. PUBLIC ACCEPTABILITY OF FOREST MANAGEMENT PRACTICES AT MORGAN-MONROE STATE FOREST

    E-Print Network [OSTI]

    providing brief explanations of alternative management practices. An on-site survey of recreationists to forest management on public land, the present study used survey methodologies to examine stakeholder254 PUBLIC ACCEPTABILITY OF FOREST MANAGEMENT PRACTICES AT MORGAN-MONROE STATE FOREST Shannon C

  6. Dark Energy Survey

    ScienceCinema (OSTI)

    Roodman, Aaron; Nord, Brian; Elliot, Ann

    2014-08-12T23:59:59.000Z

    Members of the Dark Energy Survey collaboration explain what they hope to learn by studying the southern sky with the world's most advanced digital camera, mounted on a telescope in Chile.

  7. NEPA COMPLIANCE SURVEY

    Broader source: Energy.gov (indexed) [DOE]

    of the State?" D D Any action that has potential impacts on Waters of the State' or wetland areas will require a separate NEPA Compliance Survey. Will the project area...

  8. The Michigan Recreational Angler Survey Tracking status and trends of Michiga ir resource use ir resource use n's anglers and the

    E-Print Network [OSTI]

    The Michigan Recreational Angler Survey Tracking status and trends of Michiga ir resource use ir of angling effort for all of Michigan's fisheries · · Method · Monthly, statewide mail survey of Michigan's licensed anglers Priority Outcomes & Management Applications glers · s · Baseline

  9. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1987-08-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  10. Environmental Survey preliminary report, Feed Materials Production Center, Fernald, Ohio

    SciTech Connect (OSTI)

    Not Available

    1987-03-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the environmental survey of the United States Department of Energy (DOE) Feed Materials Production Center (FMPC), conducted June 16 through 27, 1986. The survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the survey is to identify environmental problems and areas of environmental risk associated with the FMPC. The survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the survey involves the review of existing site environmental data, observations of the operations carried on at FMPC, and interviews with site personnel. The survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its onsite activities. The Sampling and Analysis Plan will be executed by a DOE national laboratory or a support contractor. When completed, the results will be incorporated into the FMPC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the FMPC survey. 41 refs., 20 figs., 25 tabs.

  11. Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado

    SciTech Connect (OSTI)

    Not Available

    1987-06-01T23:59:59.000Z

    This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

  12. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    SciTech Connect (OSTI)

    Not Available

    1988-04-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs.

  13. Environmental Survey preliminary report, Argonne National Laboratory, Argonne, Illinois

    SciTech Connect (OSTI)

    Not Available

    1988-11-01T23:59:59.000Z

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Argonne National Laboratory (ANL), conducted June 15 through 26, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ANL, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S A Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the S A results will be incorporated into the Argonne National Laboratory Environmental Survey findings for inclusion in the Environmental Survey Summary Report. 75 refs., 24 figs., 60 tabs.

  14. Environmental Survey preliminary report, Kansas City Plant, Kansas City, Missouri

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE), Kansas City Plant (KCP), conducted March 23 through April 3, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the KCP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data observations of the operations performed at the KCP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the KCP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the KCP Survey. 94 refs., 39 figs., 55 tabs.

  15. Environmental Survey preliminary report, Stanford Linear Accelerator Center, Stanford, California

    SciTech Connect (OSTI)

    Not Available

    1988-07-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Survey of the US Department of Energy (DOE) Stanford Linear Accelerator Center (SLAC) at Stanford, California, conducted February 29 through March 4, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the SLAC. The Survey covers all environmental media and all areas of environmental regulation and is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations at the SLAC, and interviews with site personnel. The Survey team is developing a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the SLAC facility. The Interim Report will reflect the final determinations of the SLAC Survey. 95 refs., 25 figs., 25 tabs.

  16. Environmental Survey preliminary report, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1987-11-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE), Y-12 Plant, conducted November 10 through 21 and December 9 through 11, 1986. This Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Y-12 Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Y-12, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the Y-12 Plant Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Y-12 Plant Survey. 80 refs., 76 figs., 61 tabs.

  17. Environmental Survey preliminary report, Brookhaven National Laboratory, Upton, New York

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Brookhaven National Laboratory (BNL) conducted April 6 through 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with BNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at BNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Oak Ridge National Laboratory. When completed, the results will be incorporated into the BNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the BNL Survey. 80 refs., 24 figs., 48 tabs.

  18. BASF's Energy Survey Methodology

    E-Print Network [OSTI]

    Theising, T. R.

    2005-01-01T23:59:59.000Z

    and cost breakdowns by utility types are identified to further analyze trends. Consideration is given to the review of the various energy supply contracts for alternative options that may exist. The consumption history is used to create a distribution...BASF?s Energy Survey Methodology Thomas R. Theising BASF Corporation operates several dozen manufacturing Sites within NAFTA and periodically conducts Energy Surveys at each Site. Although these manufacturing sites represent a variety...

  19. Benchmarking survey for recycling.

    SciTech Connect (OSTI)

    Marley, Margie Charlotte; Mizner, Jack Harry

    2005-06-01T23:59:59.000Z

    This report describes the methodology, analysis and conclusions of a comparison survey of recycling programs at ten Department of Energy sites including Sandia National Laboratories/New Mexico (SNL/NM). The goal of the survey was to compare SNL/NM's recycling performance with that of other federal facilities, and to identify activities and programs that could be implemented at SNL/NM to improve recycling performance.

  20. u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    lAIA1) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPINT:Arizona Geological Survey PROJECT TITLE: Siale Geological Survey Contributions to the...

  1. CONTRACTOR ASBESTOS INFORMATION ASBESTOS MANAGEMENT AT SFU

    E-Print Network [OSTI]

    CONTRACTOR ASBESTOS INFORMATION ASBESTOS MANAGEMENT AT SFU An extensive Asbestos Survey has been term Asbestos Management Program was approved by the Workers' Compensation Board of British Columbia. Note: There is a possibility that ACM containing materials may not have been identified or labeled

  2. SUBCONTRACT MANAGEMENT

    Energy Savers [EERE]

    0-1 CHAPTER 10 SUBCONTRACT MANAGEMENT (Revised October 19, 2011) WHAT ARE THE BASIC PRINCIPLES AND OBJECTIVES OF SUBCONTRACT MANAGEMENT? 1. To ensure contractors establish,...

  3. Deployment of ITS: A Summary of the 2010 National Survey Results

    SciTech Connect (OSTI)

    Gordon, Stephen Reed [ORNL; Trombly, Jeff [Science Applications International Corporation (SAIC), Oak Ridge, TN

    2011-08-01T23:59:59.000Z

    This report presents summary results of the 2010 ITS Deployment Tracking survey, the most recent survey conducted by the ITS Deployment Tracking Project. The U.S. Department of Transportation and its member agencies, including the Research and Innovative Technology Administration, have pursued a research and development agenda, the Intelligent Transportation System (ITS) Program, designed to integrate the latest in information technologies to improve the safety, mobility, and reliability of surface transportation modes. Within metropolitan areas, implementation of these advanced technologies has been accomplished by a variety of state and local transportation and emergency management agencies as well as the private sector. In order to measure the rate of ITS deployment within the nation s largest metropolitan areas, the ITS Deployment Tracking Project has conducted a nationwide survey of state and local transportation and emergency management agencies nearly every year since 1997. The results presented in this report are intended to be a summary of the entire database from the 2010 survey. Access to the complete survey results and previous national surveys are available on-line at http://www.itsdeployment.its.dot.gov. The website also provides access to survey results in the form of downloadable reports, including a survey summary for each survey type and fact sheets. Nearly 1,600 surveys were distributed to state and local transportation agencies in 2010. A total of seven (7) survey types were distributed including: Freeway Management, Arterial Management, Transit Management, Transportation Management Center (TMC), Electronic Toll Collection (ETC), Public Safety Law Enforcement, and Public Safety Fire/Rescue. Among other things, the data collection results indicate that ITS has moved from being experimental to mainstream and interest in continuing investments in ITS continues to be very strong. When asked about future deployment plans, one-third to three-fourths of the different agency types report they will expand current deployments and about half are planning to invest in new technologies over the next three years.

  4. Margin of Safety Definition and Examples Used in Safety Basis Documents and the USQ Process

    SciTech Connect (OSTI)

    Beaulieu, R. A.

    2013-10-03T23:59:59.000Z

    The Nuclear Safety Management final rule, 10 CFR 830, provides an undefined term, margin of safety (MOS). Safe harbors listed in 10 CFR 830, Table 2, such as DOE?STD?3009 use but do not define the term. This lack of definition has created the need for the definition. This paper provides a definition of MOS and documents examples of MOS as applied in a U.S. Department of Energy (DOE) approved safety basis for an existing nuclear facility. If we understand what MOS looks like regarding Technical Safety Requirements (TSR) parameters, then it helps us compare against other parameters that do not involve a MOS. This paper also documents parameters that are not MOS. These criteria could be used to determine if an MOS exists in safety basis documents. This paper helps DOE, including the National Nuclear Security Administration (NNSA) and its contractors responsible for the safety basis improve safety basis documents and the unreviewed safety question (USQ) process with respect to MOS.

  5. STEP Participant Survey Executive Summary

    Broader source: Energy.gov [DOE]

    STEP Participant Survey Executive Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  6. UNIVERSITY OF MANITOBA Procedures: ASBESTOS MANAGEMENT PROGRAM PROCEDURE

    E-Print Network [OSTI]

    Major, Arkady

    UNIVERSITY OF MANITOBA PROCEDURE Procedures: ASBESTOS MANAGEMENT PROGRAM PROCEDURE Parent Policy relevant to management and control of asbestos-containing building materials known to be present throughout be made on a regular and required basis, in consultation with the Asbestos Management Program Committee

  7. NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY 1 Risk Management Framework

    E-Print Network [OSTI]

    NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY 1 Risk Management Framework Computer Security Enterprise Risk Key activities in managing enterprise-level risk--risk resulting from the operation on a continuous basis #12;NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY 3 Risk Management Framework Security Life

  8. Hospitality Management Hospitality Management

    E-Print Network [OSTI]

    McConnell, Terry

    of the Department of Hospitality Management and to the recorder in the College of Human Ecology. Required HPM 114 Food Safety and Quality Assurance 2 AND HPM 115 Food Science I 3 AND HPM 216 Restaurant and Food Service Operations 4 OR NSD 225 Nutrition in Health 3 12 credits needed: HPM 300 Selected Topics: Advanced

  9. Engineering Design and Safety Basis Inspection Criteria, Inspection...

    Broader source: Energy.gov (indexed) [DOE]

    to this is our commitment to enhance our program. Therefore, we have developed the Engineering Design and Safety Basis Inspection Criteria, Inspection Activities, and Lines of...

  10. Assessing Beyond Design Basis Seismic Events and Implications...

    Office of Environmental Management (EM)

    on Seismic Risk Assessing Beyond Design Basis Seismic Events and Implications on Seismic Risk September 19, 2012 Presenter: Jeffrey Kimball, Technical Specialist (Seismologist)...

  11. Perspective on Beyond Design Basis Event Analysis and Response

    Broader source: Energy.gov [DOE]

    Presenter: John Schwenker, Nuclear Safety Manager for Liquid Operations, Savannah River Remediation, LLC, Savannah River Site

  12. The design of a decision support system for supply chain risk management

    E-Print Network [OSTI]

    Deshmukh, Vinay (Vinay D.)

    2007-01-01T23:59:59.000Z

    Where can things go wrong? This deceptively simple question has fascinated mankind since time immemorial. The question in fact forms the basis of risk management. The focus of this thesis is the risk management of supply ...

  13. Conference Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-03T23:59:59.000Z

    To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

  14. The Dark Energy Survey

    E-Print Network [OSTI]

    The Dark Energy Survey Collaboration

    2005-10-12T23:59:59.000Z

    We describe the Dark Energy Survey (DES), a proposed optical-near infrared survey of 5000 sq. deg of the South Galactic Cap to ~24th magnitude in SDSS griz, that would use a new 3 sq. deg CCD camera to be mounted on the Blanco 4-m telescope at Cerro Telolo Inter-American Observatory (CTIO). The survey data will allow us to measure the dark energy and dark matter densities and the dark energy equation of state through four independent methods: galaxy clusters, weak gravitational lensing tomography, galaxy angular clustering, and supernova distances. These methods are doubly complementary: they constrain different combinations of cosmological model parameters and are subject to different systematic errors. By deriving the four sets of measurements from the same data set with a common analysis framework, we will obtain important cross checks of the systematic errors and thereby make a substantial and robust advance in the precision of dark energy measurements.

  15. Environmental Survey preliminary report, Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1987-12-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE) Lawrence Livermore National Laboratory (LLNL), conducted December 1 through 19, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with LLNL. The Survey covers all environmental media all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at LLNL, and interviews with site personnel. A Sampling and Analysis Plan was developed to assist in further assessing certain of the environmental problems identified during performance of on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory. When completed, the results will be incorporated into the LLNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the LLNL Survey. 70 refs., 58 figs., 52 tabs.,

  16. Environmental Survey preliminary report, Portsmouth Uranium Enrichment Complex, Piketon, Ohio

    SciTech Connect (OSTI)

    Not Available

    1987-08-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Portsmouth Uranium Enrichment Complex (PUEC), conducted August 4 through August 15, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team specialists are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at PUEC, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Argonne National Laboratory. When completed, the results will be incorporated into the PUEC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the PUEC Survey. 55 refs., 22 figs., 21 tabs.

  17. Data Management & Characterization: Pipeline Approaches to Calibration/Reduction

    E-Print Network [OSTI]

    Ellingson, Steven W.

    /23/2001 LWA Data Management 1 #12;The LWA & the VLSS · VLSS 74 MHz all sky survey will deliver initialData Management & Characterization: Pipeline Approaches to Calibration/Reduction Namir Kassim NRL 5 ­ emerging ionospheric weather diagnostics 5/23/2001 LWA Data Management 2 #12;VLSS: Good science, Good

  18. Host virtualization: a taxonomy of management challenges Vitalian A. Danciu

    E-Print Network [OSTI]

    according to established conceptual management frameworks and juxtapose the result to a survey of currentHost virtualization: a taxonomy of management challenges Vitalian A. Danciu Munich Network Management Team Ludwig­Maximilians­UniversitË? at, Munich, Germany danciu@mnm­team.org Abstract: Host

  19. Host virtualization: a taxonomy of management challenges Vitalian A. Danciu

    E-Print Network [OSTI]

    according to established conceptual management frameworks and juxtapose the result to a survey of currentHost virtualization: a taxonomy of management challenges Vitalian A. Danciu Munich Network Management Team Ludwig-Maximilians-Universit¨at, Munich, Germany danciu@mnm-team.org Abstract: Host

  20. Nevada Test Site probable maximum flood study, part of US Geological Survey flood potential and debris hazard study, Yucca Mountain Site for US Department of Energy, Office of Civilian Radioactive Waste Management

    SciTech Connect (OSTI)

    Bullard, K.L.

    1994-08-01T23:59:59.000Z

    The US Geological Survey (USGS), as part of the Yucca Mountain Project (YMP), is conducting studies at Yucca Mountain, Nevada. The purposes of these studies are to provide hydrologic and geologic information to evaluate the suitability of Yucca Mountain for development as a high-level nuclear waste repository, and to evaluate the ability of the mined geologic disposal system (MGDS) to isolate the waste in compliance with regulatory requirements. In particular, the project is designed to acquire information necessary for the Department of Energy (DOE) to demonstrate in its environmental impact statement (EIS) and license application whether the MGDS will meet the requirements of federal regulations 10 CFR Part 60, 10 CFR Part 960, and 40 CFR Part 191. Complete study plans for this part of the project were prepared by the USGS and approved by the DOE in August and September of 1990. The US Bureau of Reclamation (Reclamation) was selected by the USGS as a contractor to provide probable maximum flood (PMF) magnitudes and associated inundation maps for preliminary engineering design of the surface facilities at Yucca Mountain. These PMF peak flow estimates are necessary for successful waste repository design and construction. The PMF technique was chosen for two reasons: (1) this technique complies with ANSI requirements that PMF technology be used in the design of nuclear related facilities (ANSI/ANS, 1981), and (2) the PMF analysis has become a commonly used technology to predict a ``worst possible case`` flood scenario. For this PMF study, probable maximum precipitation (PMP) values were obtained for a local storm (thunderstorm) PMP event. These values were determined from the National Weather Services`s Hydrometeorological Report No. 49 (HMR 49).

  1. A Survey on Time-aware Business Process Modeling Saoussen Cheikhrouhou1

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Survey on Time-aware Business Process Modeling Saoussen Cheikhrouhou1 , Slim Kallel1 , Nawal : Business Process Modeling (BPM) : Workflow : Web service composition : Inter-Organisational Business suites. Consequently, modeling and managing temporal requirements in the business process field

  2. Whole-building systems integration laboratory survey

    SciTech Connect (OSTI)

    Crawley, D.B. (American Consulting Engineers Council, Washington, DC (USA). Research and Management Foundation)

    1989-09-01T23:59:59.000Z

    This report was prepared for the Pacific Northwest Laboratory as a subcontracted activity by the Research Management Foundation of the American Consulting Engineers Council. The objective of the survey reported herein was to independently assess the need for a Building System Integration Laboratory from the viewpoint of academicians in the field of building science. The subcontractor-developed questionnaire was sent to 200 professors of architecture and engineering at US universities. In view of this diverse population, the 10% rate of return on the questionnaire was considered acceptable. Although the responses probably do not reflect an unbiased summary of the collective perceptions of the original population surveyed, they do provide a valid insight into the interests and concerns of the academic community with respect to building sciences issues.

  3. Utility FGD survey: January--December 1989

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M.

    1992-03-01T23:59:59.000Z

    This is Volume 1 of the Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company.

  4. Utility FGD survey, Janurary--December 1988

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. (IT Corp., Cincinnati, OH (United States))

    1991-09-01T23:59:59.000Z

    The Utility FGD Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company. Simplified process flow diagrams of FGD systems, definitions, and a glossary of terms are attached to the report. Current data for domestic FGD systems show systems in operation, systems under construction, and systems planned. The current total FGD-controlled capacity in the United States is 67,091 MW. 2 figs., 9 tabs.

  5. Utility FGD survey, January--December 1988

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. (IT Corp., Cincinnati, OH (United States))

    1991-09-01T23:59:59.000Z

    The Utility FGD Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, systems designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company. Simplified process flow diagrams of FGD systems, definitions, and a glossary of terms are attached to the report. Current data for domestic FGD systems show systems in operation, systems under construction, and systems planned. The current total FGD-controlled capacity in the United States is 67,091 MW.

  6. Utility FGD survey, January--December 1988

    SciTech Connect (OSTI)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. (IT Corp., Cincinnati, OH (United States))

    1991-09-01T23:59:59.000Z

    The Utility FGD Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company. Simplified process flow diagrams of FGD systems, definitions, and a glossary of terms are attached to the report. Current data for domestic FGD systems show systems in operation, systems under construction, and systems planned. The current total FGD-controlled capacity in the United States is 67,091 MW.

  7. A Taxonomy and Survey of Energy-Efficient Data Centers

    E-Print Network [OSTI]

    Buyya, Rajkumar

    . . . . . . . . . . . . . . . . . . . . . . . . . . 60 4. Taxonomy of Power/Energy Management in Computing Systems . . . . . 61 5. Hardware and FirmwareA Taxonomy and Survey of Energy-Efficient Data Centers and Cloud Computing Systems ANTON BELOGLAZOV has been shifted to power and energy efficiency. To identify open challenges in the area

  8. NASA Earth Science Technology Office (ESTO) Decadal Survey Technology Investments

    E-Print Network [OSTI]

    Christian, Eric

    investments · Risks are retired before major dollars are invested: a cost-effective approach to technologyNASA Earth Science Technology Office (ESTO) Decadal Survey Technology Investments January 7, 2009 #12;Overview: Earth Science Technology Office Science Driven, Competed, Actively Managed

  9. Survey of Critical Biological Resources Garfield County, Colorado

    E-Print Network [OSTI]

    Survey of Critical Biological Resources Garfield County, Colorado Volume I Prepared for Garfield of the Garfield County Commissioners, the Planning Department, and the Assessor's office. We received much help and good advice from the Bureau of Land Management, especially Carla Scheck and Dan Sokal in the Glenwood

  10. Operations Improvement Surveys

    E-Print Network [OSTI]

    Guide, J. J.; O'Brien, W. J.

    1984-01-01T23:59:59.000Z

    Exxon Chemical Company developed unique site-wide energy optimization technology in the mid1970's. This technology was applied by means of site energy surveys which were carried out at every major Exxon facility throughout the world during the 1976...

  11. Center for Environmental Management of Military Lands (970) 491-2748 cemml@cemml.colostate.edu

    E-Print Network [OSTI]

    in cultural resources management planning and compliance. The goal is to ensure that these diverse services: · Planning level surveys for archaeological resources, traditional cultural properties and structures · Integrated Cultural Resource Management Plans (ICRMPs) · Archaeological resource monitoring

  12. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Willamette River Basin, 1934-1942, Final Report.

    SciTech Connect (OSTI)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1995-01-01T23:59:59.000Z

    This document contains summary reports of stream habitat-surveys, conducted in the Willamette River basin, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1934-1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al., 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries contained in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database should be used to assess pool and substrate conditions. This data is available from the Bonneville Power Administration. The Bureau of Fisheries survey is unique because it is the only long-term data set that quantifies fish habitat in a manner that is replicable over time; no other similar work is known to exist. Other surveys, such as Thompson and Haas (1960), inventoried extensive areas in a manner that was mostly qualitative, subjectively estimating physical characteristics like bank cover and stream shading. Spawning, rearing, and resting habitat were not systematically quantified to allow comparisons over time. Knowledge of past and present quantity and quality of anadromous fish habitat in the Columbia River Basin is essential to any effort to enhance fish populations. Habitat condition is a key element in monitoring and evaluating progress towards the doubling goal. Integration of this information into the Columbia River Fish and Wildlife Plan can provide the basis to greatly enhance understanding of past, present, and future habitat conditions in the basin to provide for improved management decisions.

  13. The XMM/Megacam-VST/VIRMOS Large Scale Structure Survey

    E-Print Network [OSTI]

    M. Pierre

    2000-11-08T23:59:59.000Z

    The objective of the XMM-LSS Survey is to map the large scale structure of the universe, as highlighted by clusters and groups of galaxies, out to a redshift of about 1, over a single 8x8 sq.deg. area. For the first time, this will reveal the topology of the distribution of the deep potential wells and provide statistical measurements at truly cosmological distances. In addition, clusters identified via their X-ray properties will form the basis for the first uniformly-selected, multi-wavelength survey of the evolution of clusters and individual cluster galaxies as a function of redshift. The survey will also address the very important question of the QSO distribution within the cosmic web.

  14. The pointer basis and the feedback stabilization of quantum systems

    E-Print Network [OSTI]

    L. Li; A. Chia; H. M. Wiseman

    2014-11-19T23:59:59.000Z

    The dynamics for an open quantum system can be `unravelled' in infinitely many ways, depending on how the environment is monitored, yielding different sorts of conditioned states, evolving stochastically. In the case of ideal monitoring these states are pure, and the set of states for a given monitoring forms a basis (which is overcomplete in general) for the system. It has been argued elsewhere [D. Atkins et al., Europhys. Lett. 69, 163 (2005)] that the `pointer basis' as introduced by Zurek and Paz [Phys. Rev. Lett 70, 1187(1993)], should be identified with the unravelling-induced basis which decoheres most slowly. Here we show the applicability of this concept of pointer basis to the problem of state stabilization for quantum systems. In particular we prove that for linear Gaussian quantum systems, if the feedback control is assumed to be strong compared to the decoherence of the pointer basis, then the system can be stabilized in one of the pointer basis states with a fidelity close to one (the infidelity varies inversely with the control strength). Moreover, if the aim of the feedback is to maximize the fidelity of the unconditioned system state with a pure state that is one of its conditioned states, then the optimal unravelling for stabilizing the system in this way is that which induces the pointer basis for the conditioned states. We illustrate these results with a model system: quantum Brownian motion. We show that even if the feedback control strength is comparable to the decoherence, the optimal unravelling still induces a basis very close to the pointer basis. However if the feedback control is weak compared to the decoherence, this is not the case.

  15. Energy Use Analysis for the Federal Energy Management Program 

    E-Print Network [OSTI]

    Mazzucchi, R. P.; Devine, K. D.

    1988-01-01T23:59:59.000Z

    -efficient, the Federal Energy Management Program (FEMP) endeavors to improve the technical basis for such performance-based contracting. Specific tasks include the development of improved energy use baselining methods, refinement of a simplified energy analysis method...

  16. Federal Buildings Supplemental Survey 1993

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    The Energy Information Administration (EIA) of the US Department of Energy (DOE) is mandated by Congress to be the agency that collects, analyzes, and disseminates impartial, comprehensive data about energy including the volume consumed, its customers, and the purposes for which it is used. The Federal Buildings Supplemental Survey (FBSS) was conducted by EIA in conjunction with DOE`s Office of Federal Energy Management Programs (OFEMP) to gain a better understanding of how Federal buildings use energy. This report presents the data from 881 completed telephone interviews with Federal buildings in three Federal regions. These buildings were systematically selected using OFEMP`s specifications; therefore, these data do not statistically represent all Federal buildings in the country. The purpose of the FBSS was threefold: (1) to understand the characteristics of Federal buildings and their energy use; (2) to provide a baseline in these three Federal regions to measure future energy use in Federal buildings as required in EPACT; and (3) to compare building characteristics and energy use with the data collected in the CBECS.

  17. Enterprise Feedback Survey Tool

    E-Print Network [OSTI]

    Dalaq, Akram

    2008-05-16T23:59:59.000Z

    communicate to the audiences at a low cost, but also for the first time in human history, individuals can make their personal thoughts, reactions and opinion easily accessible to many members of the community within the organization. Perhaps the best... interfaces between them. Design refers to the processes that constitute definition of physical design specifications, which will serve as the basis for development efforts. Design phase encompasses two steps • Design Specification facilitates creation...

  18. A new well surveying tool 

    E-Print Network [OSTI]

    Haghighi, Manuchehr Mehdizabeh

    1966-01-01T23:59:59.000Z

    Bore Surveying Instrument TABLES . . . 17 1. Comparison of Measured Angles and Angles Indicated by Surveying Device for S 20 W and 13 , N 22 W and 51 . . . . . . . . . . . . . . . . . . . . 20 2. Comparison of Measured Angles and Angles Indicated... by Surveying Device for S and 19 , N and 41 . 21 3. Comparison of Measured Angles and Angles Indicated by Surveying Device for NE snd 9 , W and 45 . . . . . . . ~ 22 ABSTRNl T Ever since the advent of rotary drilling the petroleum industry has been...

  19. Project Management Plan Resident Management System (RMS)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

  20. The power of simplification: Operator interface with the AP1000{sup R} during design-basis and beyond design-basis events

    SciTech Connect (OSTI)

    Williams, M. G.; Mouser, M. R.; Simon, J. B. [Westinghouse Electric Company, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01T23:59:59.000Z

    The AP1000{sup R} plant is an 1100-MWe pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance, safety and cost. The passive safety features are designed to function without safety-grade support systems such as component cooling water, service water, compressed air or HVAC. The AP1000 passive safety features achieve and maintain safe shutdown in case of a design-basis accident for 72 hours without need for operator action, meeting the expectations provided in the European Utility Requirements and the Utility Requirement Document for passive plants. Limited operator actions may be required to maintain safe conditions in the spent fuel pool (SFP) via passive means. This safety approach therefore minimizes the reliance on operator action for accident mitigation, and this paper examines the operator interaction with the Human-System Interface (HSI) as the severity of an accident increases from an anticipated transient to a design basis accident and finally, to a beyond-design-basis event. The AP1000 Control Room design provides an extremely effective environment for addressing the first 72 hours of design-basis events and transients, providing ease of information dissemination and minimal reliance upon operator actions. Symptom-based procedures including Emergency Operating Procedures (EOPs), Abnormal Operating Procedures (AOPs) and Alarm Response Procedures (ARPs) are used to mitigate design basis transients and accidents. Use of the Computerized Procedure System (CPS) aids the operators during mitigation of the event. The CPS provides cues and direction to the operators as the event progresses. If the event becomes progressively worse or lasts longer than 72 hours, and depending upon the nature of failures that may have occurred, minimal operator actions may be required outside of the control room in areas that have been designed to be accessible using components that have been designed to be reliable in these conditions. The primary goal of any such actions is to maintain or refill the passive inventory available to cool the core, containment and spent fuel pool in the safety-related and seismically qualified Passive Containment Cooling Water Storage Tank (PCCWST). The seismically-qualified, ground-mounted Passive Containment Cooling Ancillary Water Storage Tank (PCCAWST) is also available for this function as appropriate. The primary effect of these actions would be to increase the coping time for the AP1000 during design basis events, as well as events such as those described above, from 72 hours without operator intervention to 7 days with minimal operator actions. These Operator actions necessary to protect the health and safety of the public are addressed in the Post-72 Hour procedures, as well as some EOPs, AOPs, ARPs and the Severe Accident Management Guidelines (SAMGs). Should the event continue to become more severe and plant conditions degrade further with indications of inadequate core cooling, the SAMGs provide guidance for strategies to address these hypothetical severe accident conditions. The AP1000 SAMG diagnoses and actions are prioritized to first utilize the AP1000 features that are expected to retain a damaged core inside the reactor vessel. Only one strategy is undertaken at any time. This strategy will be followed and its effectiveness evaluated before other strategies are undertaken. This is a key feature of both the symptom-oriented AP1000 EOPs and the AP1000 SAMGs which maximizes the probability of retaining a damaged core inside the reactor vessel and containment while minimizing the chances for confusion and human errors during implementation. The AP1000 SAMGs are simple and straight-forward and have been developed with considerable input from human factors and plant operations experts. Most importantly, and different from severe accident management strategies for other plants, the AP1000 SAMGs do not require diagnosis of the location of the core (i.e., whether reactor vessel failure has occurred). This is a fun

  1. ARM User Survey Report

    SciTech Connect (OSTI)

    Roeder, LR

    2010-06-22T23:59:59.000Z

    The objective of this survey was to obtain user feedback to, among other things, determine how to organize the exponentially growing data within the Atmospheric Radiation Measurement (ARM) Climate Research Facility, and identify users’ preferred data analysis system. The survey findings appear to have met this objective, having received approximately 300 responses that give insight into the type of work users perform, usage of the data, percentage of data analysis users might perform on an ARM-hosted computing resource, downloading volume level where users begin having reservations, opinion about usage if given more powerful computing resources (including ability to manipulate data), types of tools that would be most beneficial to them, preferred programming language and data analysis system, level of importance for certain types of capabilities, and finally, level of interest in participating in a code-sharing community.

  2. Forensic Management Academy Spring 2011 Tentative Schedule Forensic Management Academy

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    :30 ­ 11:30 Session VI Fundamentals of Budgeting Paul Speaker 8:30 ­ 11:30 Session IX Process Improvement Teams Joyce Heames 1:00 ­ 4:00 Session V Succession Planning Dean Gialamas 1:00 ­ 4:00 Session VII Cost Benefit as the Basis for Financial Decisions Paul Speaker 1:00 ­ 4:00 Session X Project Management Bob

  3. Speculations About the Selective Basis for Modern Human Craniofacial Form

    E-Print Network [OSTI]

    Lieberman, Daniel E.

    Speculations About the Selective Basis for Modern Human Craniofacial Form DANIEL E. LIEBERMAN. To name just a few of our unusual craniofacial apo- morphies, we are the only extant pri- mate

  4. Quasi Sturmian Basis in Two-Electron Continuum Problems

    E-Print Network [OSTI]

    A. S. Zaytsev; L. U. Ancarani; S. A. Zaytsev

    2015-03-12T23:59:59.000Z

    A new type of basis functions is proposed to describe a two-electron continuum which arises as a final state in electron-impact ionization and double photoionization of atomic systems. We name these functions, which are calculated in terms of the recently introduced Quasi Sturmian functions, Convoluted Quasi Sturmian functions (CQS). By construction, the CQS functions look asymptotically like a six-dimensional spherical wave. The driven equation describing an $(e, 3e)$ process on helium in the framework of the Temkin-Poet model has been solved numerically using expansions on the basis CQS functions. The convergence behavior of the solution has been examined as the size of the basis has been increased. The calculations show that the convergence rate is significantly improved by introducing a phase factor corresponding the electron-electron interaction into the basis functions. Such a modification of the boundary conditions leads to appreciable change in the magnitude of the solution.

  5. auf basis einer: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assoziiert. Ziel der vorliegenden Studie war es, den Einfluss einer (more) Zachmann, Christin 2014-01-01 23 77Weniger ist mehr Virtuelle Thin Clients auf Linux-Basis...

  6. Is the Preferred Basis selected by the environment?

    E-Print Network [OSTI]

    Tian Wang; David Hobill

    2014-12-09T23:59:59.000Z

    We show that in a quantum measurement, the preferred basis is determined by the interaction between the apparatus and the quantum system, instead of by the environment. This interaction entangles three degrees of freedom, one system degree of freedom we are interested in and preserved by the interaction, one system degree of freedom that carries the change due to the interaction, and the apparatus degree of freedom which is always ignored. Considering all three degrees of freedom the composite state only has one decomposition, and this guarantees that the apparatus would end up in the expected preferred basis of our daily experiences. We also point out some problems with the environment-induced super-selection (Einselection) solution to the preferred basis problem, and clarifies a common misunderstanding of environmental decoherence and the preferred basis problem.

  7. Mining Weak Lensing Surveys

    E-Print Network [OSTI]

    N. Padmanabhan; U. Seljak; U. L. Pen

    2002-10-21T23:59:59.000Z

    We present a survey of the cosmological applications of the next generation of weak lensing surveys, paying special attention to the computational challenges presented by the number of galaxies, $N_{gal} ~$ 10$^{5}$. We focus on optimal methods with no pixelization and derive a multigrid $P^3M$ algorithm that performs the relevant computations in $O(N_{gal} \\log N_{gal})$ time. We test the algorithm by studying three applications of weak lensing surveys - convergence map reconstruction, cluster detection and $E$ and $B$ power spectrum estimation using realistic 1 deg^{2} simulations derived from N-body simulations. The map reconstruction is able to reconstruct large scale features without artifacts. Detecting clusters using only weak lensing is difficult because of line of sight contamination and noise, with low completeness if one desires low contamination of the sample. A power spectrum analysis of the convergence field is more promising and we are able to reconstruct the convergence spectrum with no loss of information down to the smallest scales. The numerical methods used here can be applied to other data sets with same $O(N\\log N)$ scaling and can be generalised to a sphere.

  8. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    SciTech Connect (OSTI)

    COOPER, J.R.

    2000-04-17T23:59:59.000Z

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  9. Risk Management for Web and Distributed Software Development Projects Ayad Ali Keshlaf

    E-Print Network [OSTI]

    Newcastle upon Tyne, University of

    Risk Management for Web and Distributed Software Development Projects Ayad Ali Keshlaf School and managed. In this paper we survey a number of software risk management approaches and identify weaknesses approach to measure and control web and distributed development risks. Keywords-software risk management

  10. 2006-2605: DETERMINING HOW TO TEACH PROJECT MANAGEMENT CONCEPTS TO ENGINEERS

    E-Print Network [OSTI]

    Conrad, James M.

    either as a manager or as a member of the team. A recent survey included more than 100 senior-level PM2006-2605: DETERMINING HOW TO TEACH PROJECT MANAGEMENT CONCEPTS TO ENGINEERS James Conrad and a Certified Project Management Professional (PMP). He is also a member of Eta Kappa Nu, the Project Management

  11. High integrity software for nuclear power plants: Candidate guidelines, technical basis and research needs. Main report, Volume 2

    SciTech Connect (OSTI)

    Seth, S.; Bail, W.; Cleaves, D.; Cohen, H.; Hybertson, D.; Schaefer, C.; Stark, G.; Ta, A.; Ulery, B. [Mitre Corp., McLean, VA (United States)

    1995-06-01T23:59:59.000Z

    The work documented in this report was performed in support of the US Nuclear Regulatory Commission to examine the technical basis for candidate guidelines that could be considered in reviewing and evaluating high integrity computer e following software development and assurance activities: Requirements specification; design; coding; verification and validation, inclukding static analysis and dynamic testing; safety analysis; operation and maintenance; configuration management; quality assurance; and planning and management. Each activity (framework element) was subdivided into technical areas (framework subelements). The report describes the development of approximately 200 candidate guidelines that span the entire ran e identification, categorization and prioritization of technical basis for those candidate guidelines; and the identification, categorization and prioritization of research needs for improving the technical basis. The report has two volumes: Volume 1, Executive Summary includes an overview of the framwork and of each framework element, the complete set of candidate guidelines, the results of the assessment of the technical basis for each candidate guideline, and a discussion of research needs that support the regulatory function; this document, Volume 2, is the main report.

  12. Characteristics of successful risk management in product design

    E-Print Network [OSTI]

    Olechowski, Alison Louise

    The paper reports results of one of the largest empirical studies to-date on the impact of design risk management practices on product design success. Through a survey of 224 practices, 38 (in 7 categories) where found to ...

  13. Examining solid waste management issues in the City of Bryan 

    E-Print Network [OSTI]

    Arekere, Dhananjaya Marigowda

    2006-04-12T23:59:59.000Z

    Economic aspects of household recycling behavior and attitudes in City of Bryan are examined to improve solid waste management policies in the city. Using survey data collected by mail and personal interviews, residentsÂ? ...

  14. Energy Management Services for the Industrial Market Segment at TVA

    E-Print Network [OSTI]

    Hamby, R. E.; Knight, V. R.

    1984-01-01T23:59:59.000Z

    The Tennessee Valley Authority has provided energy management surveys (EMSs) to commercial and industrial power consumers since 1979. A significant number of EMSs have been performed to a variety of industry types and sizes. As in all developmental...

  15. Interactive graphical timelines as collaborative scenario management tools

    E-Print Network [OSTI]

    Riddle, Austin Christopher

    2008-10-10T23:59:59.000Z

    Correlation Elements...................................31 Figure 9: Scenario Oracle Interface .................................................................................34 Figure 10: Command Archive Manager Execution...........................................................................................17 Table 2: Demographic Survey Results (Abridged) ..........................................................47 Table 3: Questionnaire Results ........................................................................................48 Table 4...

  16. A Technical and Distributed Management Basis for an Environmentally Clean and Sustainable Energy Supply

    E-Print Network [OSTI]

    Wedde, Horst F.

    and balancing power capacities could obviously meet these demands. This was an encouraging incentive for our and sustainable technologies are based on solar or wind power, or on other renewable energy sources unpredictable. With our combined expertise in Real-Time systems and Electric Power Distribution we developed

  17. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Presenters: Rich Davies, Kami Lowry, Mike Schlender, Ted Pietrok, Pacific Northwest National Laboratory and Pacific Northwest Site Office

  18. SCHOOL OF ENGINEERING TECHNOLOGY Surveying Engineering

    E-Print Network [OSTI]

    Thomas, Andrew

    SCHOOL OF ENGINEERING TECHNOLOGY Surveying Engineering Technology practice FOCUSED WHY SURVEYING ENGINEERING TECHNOLOGY? Surveying engineering technology is a practice- focused program that provides students ENGINEERING TECHNOLOGY DEGREE? A graduate with a surveying engineering technology degree can work as a party

  19. Survey of Rare Plants San Juan Public Lands in Dolores and

    E-Print Network [OSTI]

    National Forest--are in the process of revising their management plan. Since one of their missions has beenSurvey of Rare Plants San Juan Public Lands in Dolores and Montezuma Counties, Colorado Colorado #12;EXECUTIVE SUMMARY The San Juan Public Lands agencies--Bureau of Land Management and San Juan

  20. Quality Management and Job Quality: How the ISO 9001 Standard forQuality Management Systems Affects Employees and Employers

    E-Print Network [OSTI]

    Levine, David I.; Toffel, Michael W.

    2008-01-01T23:59:59.000Z

    M.J. , F.M. Veloso. 2008. ISO 9000 practices and financialon global standards: A 15-economy survey of ISO 9000and ISO 14000. ISO Management Systems (Jan-Feb). http://

  1. A survey and comparative analysis of selected university outdoor recreation/education centers

    E-Print Network [OSTI]

    Brewer, Randy Carter

    1984-01-01T23:59:59.000Z

    of the survey schedule can be found in Appendix A. Methods of Data Collection The method of data collection utilized in this study was the on-site personal interview. As a method of data collection in survey studies, the personal interview has been held...- search technique was an on-site population status survey based on a 3x2x2 classification scheme using an interview data collection technique. It was concluded that major outdoor recreation/education centers (O'RECs) develop on the basis of individual...

  2. Managing the Steam Trap Population

    E-Print Network [OSTI]

    Atlas, R. D.

    1983-01-01T23:59:59.000Z

    item? .However, some converts to the gospel of enlighten ed steam trap management expect to achieve the following benefits: A 95% trap performance level which is a better than 30% improvement over the industry norm. Plus, we have found a well... trained. This may six surveys per year with a guaf'8nteed performance level involve two days of training per man including of better than 9596. This program usually has the best cash classroom and field instruction plus periodic flow, and faster...

  3. Southern Sky Redshift Survey

    SciTech Connect (OSTI)

    Da Costa, L.N.; Pellegrini, P.S.; Sargent, W.L.W.; Tonry, J.; Davis, M.

    1988-04-01T23:59:59.000Z

    The general characteristics of the space distribution of galaxies in the SSRS sample, covering the southern Galactic cap, are examined, and maps of the space distribution are presented. The sample consists of 2028 galaxies in an area of 1.75 sr with declination south of -17.5 deg and galactic latitude below -30 deg. The survey provides useful information on large-scale structure to a depth of 120/h Mpc. The galaxy distribution exhibits prominent filaments, sheets, and voids. Some large-scale structures are highly subclustered; others are much more diffuse. 21 references.

  4. Community Leaders Survey

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting theCommercialization and Innovation TheCommunicationsLeaders Survey Community

  5. Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina

    SciTech Connect (OSTI)

    Not Available

    1987-08-01T23:59:59.000Z

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.

  6. Phase 1 Final status survey plan for the West Valley demonstration project.

    SciTech Connect (OSTI)

    Johnson, R. L. (Environmental Science Division)

    2011-05-31T23:59:59.000Z

    This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

  7. Environmental Survey preliminary report, Morgantown Energy Technology Center, Morgantown, West Virginia

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Morgantown Energy Technology Center (METC) conducted November 30 through December 4, 1987. In addition, the preliminary findings of the Laramie Project Office (LPO) Survey, which was conducted as part of the METC Survey on January 25 through 29, 1988, are presented in Appendices E and F. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with METC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at METC, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities at METC. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the results will be incorporated into the METC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey METC. 60 refs., 28 figs., 43 tabs.

  8. Environmental Survey preliminary report, Strategic Petroleum Reserve, Texas and Louisiana Gulf Coast

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR), located in Louisiana and Texas, and conducted in two segments from November 30 through December 11, 1987, and February 1 through 10, 1988. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SPR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at SPR, and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the SPR Survey findings for inclusion into the Environmental Survey Summary Report. The Summary Report will reflect the final determinations of the SPR Survey and the other DOE site-specific Surveys. 200 refs., 50 figs., 30 tabs.

  9. Position Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-06-23T23:59:59.000Z

    The order prescribes the policies, responsibilities, and procedures for position management within (DOE). Canceled by DOE N 1321.140. Cancels DOE 3510.1

  10. Management Analyst

    Broader source: Energy.gov [DOE]

    The Wind and Water Power Technologies Office (WWPTO) manages efforts to improve performance, lower costs, and accelerate deployment of wind and water power technologies, which can play a...

  11. Quality Management

    Broader source: Energy.gov [DOE]

    The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and...

  12. Resilient Control Systems Practical Metrics Basis for Defining Mission Impact

    SciTech Connect (OSTI)

    Craig G. Rieger

    2014-08-01T23:59:59.000Z

    "Resilience” describes how systems operate at an acceptable level of normalcy despite disturbances or threats. In this paper we first consider the cognitive, cyber-physical interdependencies inherent in critical infrastructure systems and how resilience differs from reliability to mitigate these risks. Terminology and metrics basis are provided to integrate the cognitive, cyber-physical aspects that should be considered when defining solutions for resilience. A practical approach is taken to roll this metrics basis up to system integrity and business case metrics that establish “proper operation” and “impact.” A notional chemical processing plant is the use case for demonstrating how the system integrity metrics can be applied to establish performance, and

  13. The Functional Requirements and Design Basis for Information Barriers

    SciTech Connect (OSTI)

    Fuller, James L.

    2012-05-01T23:59:59.000Z

    This report summarizes the results of the Information Barrier Working Group workshop held at Sandia National Laboratory in Albuquerque, NM, February 2-4, 1999. This workshop was convened to establish the functional requirements associated with warhead radiation signature information barriers, to identify the major design elements of any such system or approach, and to identify a design basis for each of these major elements. Such information forms the general design basis to be used in designing, fabricating, and evaluating the complete integrated systems developed for specific purposes.

  14. Simple basis for hydrogenic atoms in magnetic fields

    SciTech Connect (OSTI)

    Gallas, J.A.C.

    1984-01-01T23:59:59.000Z

    A field-dependent hydrogenic basis is used to obtain the evolution of the energy spectrum of atoms in strong (approx.10/sup 8/ G) and uniform magnetic fields. The basis allows results to be derived analytically. Numerical values for the first 13 excited states of hydrogen are found to be in very good agreement with much more elaborate calculations of Smith et al. and of Brandi. In addition, the possibility of having a remnant type of degeneracy in the presence of the magnetic field is investigated.

  15. A new well surveying tool

    E-Print Network [OSTI]

    Haghighi, Manuchehr Mehdizabeh

    1966-01-01T23:59:59.000Z

    A NEW WELL SURVEYING TOOL A Thesis By MANUCHEHR MEHDIZABEH HAGHIGHI Submitted to the Graduate College of the Texas ANM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Major Subject: PETROLEUM... by Surveying Device for S and 19 , N and 41 . 21 3. Comparison of Measured Angles and Angles Indicated by Surveying Device for NE snd 9 , W and 45 . . . . . . . ~ 22 ABSTRNl T Ever since the advent of rotary drilling the petroleum industry has been...

  16. Environmental Survey preliminary report, Naval Petroleum Reserves in California (NPRC), Tupman, California

    SciTech Connect (OSTI)

    Not Available

    1989-02-01T23:59:59.000Z

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Naval Petroleum Reserves 1 (NPR-1) and 2 (NPR-2) in California (NPRC), conducted May 9--20, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPRC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at NPRC, and interviews with site personnel. 120 refs., 28 figs., 40 tabs.

  17. Extending Quality Management to Utility Costs

    E-Print Network [OSTI]

    Holmes, W. A.

    By installing permanent instrumentation and linking it to the appropriate software, a Utility Cost Management Information System, can be created which will identify where, when and how energy is used in a facility on a dynamic and real-time basis...

  18. Enterprise Risk Management Program

    E-Print Network [OSTI]

    Hayden, Nancy J.

    Enterprise Risk Management Program DRAFT Introduction to Enterprise Risk Management at UVM 1 #12;Enterprise Risk Management Program DRAFT What is Enterprise Risk Management? Enterprise risk management governance, and accountability · Facilitates effective management of the uncertainty and associated risks

  19. Consumer survey data as a basis for the derivation of retail price and income elasticities of demand

    E-Print Network [OSTI]

    Wilson, Winston Lewis

    1969-01-01T23:59:59.000Z

    by Powell, O'Reagan, and Godwin in 1958 [7]. The test involved three brands of orange juice. Prices of all three brands were varied above and below the prevailing market price . Results were used to derive de- mand and revenue curves for frozen orange...

  20. Nuclear fuel cycle risk assessment: survey and computer compilation of risk-related literature. [Once-through Cycle and Plutonium Recycle

    SciTech Connect (OSTI)

    Yates, K.R.; Schreiber, A.M.; Rudolph, A.W.

    1982-10-01T23:59:59.000Z

    The US Nuclear Regulatory Commission has initiated the Fuel Cycle Risk Assessment Program to provide risk assessment methods for assistance in the regulatory process for nuclear fuel cycle facilities other than reactors. Both the once-through cycle and plutonium recycle are being considered. A previous report generated by this program defines and describes fuel cycle facilities, or elements, considered in the program. This report, the second from the program, describes the survey and computer compilation of fuel cycle risk-related literature. Sources of available information on the design, safety, and risk associated with the defined set of fuel cycle elements were searched and documents obtained were catalogued and characterized with respect to fuel cycle elements and specific risk/safety information. Both US and foreign surveys were conducted. Battelle's computer-based BASIS information management system was used to facilitate the establishment of the literature compilation. A complete listing of the literature compilation and several useful indexes are included. Future updates of the literature compilation will be published periodically. 760 annotated citations are included.

  1. 2011 Radioactive Materials Usage Survey for Unmonitored Point Sources

    SciTech Connect (OSTI)

    Sturgeon, Richard W. [Los Alamos National Laboratory

    2012-06-27T23:59:59.000Z

    This report provides the results of the 2011 Radioactive Materials Usage Survey for Unmonitored Point Sources (RMUS), which was updated by the Environmental Protection (ENV) Division's Environmental Stewardship (ES) at Los Alamos National Laboratory (LANL). ES classifies LANL emission sources into one of four Tiers, based on the potential effective dose equivalent (PEDE) calculated for each point source. Detailed descriptions of these tiers are provided in Section 3. The usage survey is conducted annually; in odd-numbered years the survey addresses all monitored and unmonitored point sources and in even-numbered years it addresses all Tier III and various selected other sources. This graded approach was designed to ensure that the appropriate emphasis is placed on point sources that have higher potential emissions to the environment. For calendar year (CY) 2011, ES has divided the usage survey into two distinct reports, one covering the monitored point sources (to be completed later this year) and this report covering all unmonitored point sources. This usage survey includes the following release points: (1) all unmonitored sources identified in the 2010 usage survey, (2) any new release points identified through the new project review (NPR) process, and (3) other release points as designated by the Rad-NESHAP Team Leader. Data for all unmonitored point sources at LANL is stored in the survey files at ES. LANL uses this survey data to help demonstrate compliance with Clean Air Act radioactive air emissions regulations (40 CFR 61, Subpart H). The remainder of this introduction provides a brief description of the information contained in each section. Section 2 of this report describes the methods that were employed for gathering usage survey data and for calculating usage, emissions, and dose for these point sources. It also references the appropriate ES procedures for further information. Section 3 describes the RMUS and explains how the survey results are organized. The RMUS Interview Form with the attached RMUS Process Form(s) provides the radioactive materials survey data by technical area (TA) and building number. The survey data for each release point includes information such as: exhaust stack identification number, room number, radioactive material source type (i.e., potential source or future potential source of air emissions), radionuclide, usage (in curies) and usage basis, physical state (gas, liquid, particulate, solid, or custom), release fraction (from Appendix D to 40 CFR 61, Subpart H), and process descriptions. In addition, the interview form also calculates emissions (in curies), lists mrem/Ci factors, calculates PEDEs, and states the location of the critical receptor for that release point. [The critical receptor is the maximum exposed off-site member of the public, specific to each individual facility.] Each of these data fields is described in this section. The Tier classification of release points, which was first introduced with the 1999 usage survey, is also described in detail in this section. Section 4 includes a brief discussion of the dose estimate methodology, and includes a discussion of several release points of particular interest in the CY 2011 usage survey report. It also includes a table of the calculated PEDEs for each release point at its critical receptor. Section 5 describes ES's approach to Quality Assurance (QA) for the usage survey. Satisfactory completion of the survey requires that team members responsible for Rad-NESHAP (National Emissions Standard for Hazardous Air Pollutants) compliance accurately collect and process several types of information, including radioactive materials usage data, process information, and supporting information. They must also perform and document the QA reviews outlined in Section 5.2.6 (Process Verification and Peer Review) of ES-RN, 'Quality Assurance Project Plan for the Rad-NESHAP Compliance Project' to verify that all information is complete and correct.

  2. Survey on Social Networking Site for Engineering Management Program

    E-Print Network [OSTI]

    Mokkarala, Rajyalakshmi Sirisha

    2012-07-27T23:59:59.000Z

    Social Networking Sites (SNSs) such as Facebook, LinkedIn and Twitter have gained much popularity as Web 2.0 technologies and have been widely adopted by different age groups from teenagers to students to working professionals. ...

  3. Molecular basis of infrared detection by Elena O. Gracheva1

    E-Print Network [OSTI]

    Newman, Eric A.

    , snakes detect infrared signals through a mechanism involving radiant heating of the pit organ, ratherARTICLES Molecular basis of infrared detection by snakes Elena O. Gracheva1 *, Nicholas T. Ingolia2 system for detecting infrared radiation, enabling them to generate a `thermal image' of predators or prey

  4. Revising Beliefs on the Basis of Evidence James P. Delgrande

    E-Print Network [OSTI]

    Delgrande, James P.

    Fraser University Burnaby, B.C., Canada V5A 1S6 jim@cs.sfu.ca Abstract Approaches to belief revision mostRevising Beliefs on the Basis of Evidence James P. Delgrande School of Computing Science Simon is not categorical. In revision, one may circumvent this fact by assuming that, in some fashion or other, an agent

  5. Solar Power Tower Design Basis Document, Revision 0

    SciTech Connect (OSTI)

    ZAVOICO,ALEXIS B.

    2001-07-01T23:59:59.000Z

    This report contains the design basis for a generic molten-salt solar power tower. A solar power tower uses a field of tracking mirrors (heliostats) that redirect sunlight on to a centrally located receiver mounted on top a tower, which absorbs the concentrated sunlight. Molten nitrate salt, pumped from a tank at ground level, absorbs the sunlight, heating it up to 565 C. The heated salt flows back to ground level into another tank where it is stored, then pumped through a steam generator to produce steam and make electricity. This report establishes a set of criteria upon which the next generation of solar power towers will be designed. The report contains detailed criteria for each of the major systems: Collector System, Receiver System, Thermal Storage System, Steam Generator System, Master Control System, and Electric Heat Tracing System. The Electric Power Generation System and Balance of Plant discussions are limited to interface requirements. This design basis builds on the extensive experience gained from the Solar Two project and includes potential design innovations that will improve reliability and lower technical risk. This design basis document is a living document and contains several areas that require trade-studies and design analysis to fully complete the design basis. Project- and site-specific conditions and requirements will also resolve open To Be Determined issues.

  6. Market Split and Basis Reduction: Towards a Solution of the

    E-Print Network [OSTI]

    Utrecht, Universiteit

    in the book by Williams [13]. There, the application was related to the oil market in the UKMarket Split and Basis Reduction: Towards a Solution of the Cornu#19;ejols-Dawande Instances K-and-bound. They o#11;ered these market split instances as a challenge to the integer programming community

  7. Implementing Radial Basis Functions Using Bump-Resistor Networks

    E-Print Network [OSTI]

    Harris, John G.

    performance using this for- mulation [SI. Anderson, Platt and Kirk previously demonstrated the use of follower]. An alter- nate strategy used by Anderson, Platt and Kirk [l] 0-7803-1901-X/94$4.0001994 IEEE 1894 #12 . Anderson, J. C. Platt, and D. Kirk. An analog VLSI chip for radial basis functions. In J. Han- son, J

  8. Cognitively Ergonomic Route A Potential Basis for the

    E-Print Network [OSTI]

    Klippel, Alexander

    1 Cognitively Ergonomic Route Directions A Potential Basis for the OpenLS Navigation Service? Stefan Hansen, Alexander Klippel, Kai-Florian Richter Overview Background Aspect of cognitively ergonomic Ontologies and cognitive modelling (cognitive engineering) Aspects of Cognitively Ergonomic Route Directions

  9. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    SciTech Connect (OSTI)

    CROWE, R.D.

    1999-09-09T23:59:59.000Z

    This document provides the detailed accident analysis to support ''HNF-3553, Spent Nuclear Fuel Project Final Safety, Analysis Report, Annex A,'' ''Canister Storage Building Final Safety Analysis Report.'' All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

  10. Cold Vacuum Drying (CVD) Facility Design Basis Accident Analysis Documentation

    SciTech Connect (OSTI)

    PIEPHO, M.G.

    1999-10-20T23:59:59.000Z

    This document provides the detailed accident analysis to support HNF-3553, Annex B, Spent Nuclear Fuel Project Final Safety Analysis Report, ''Cold Vacuum Drying Facility Final Safety Analysis Report (FSAR).'' All assumptions, parameters and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the FSAR.

  11. Learning Active Basis Models by EM-Type Algorithms

    E-Print Network [OSTI]

    Wu, Ying Nian

    Learning Active Basis Models by EM-Type Algorithms Zhangzhang Si1, Haifeng Gong1,2, Song-Chun Zhu1, and scales as latent variables into the image generation process, and learn the template by EM-type scheme for learning image templates of object categories where the learning is not fully supervised. We

  12. PRICING COMMODITY DERIVATIVES WITH BASIS RISK AND PARTIAL OBSERVATIONS

    E-Print Network [OSTI]

    Ludkovski, Mike

    LUDKOVSKI Abstract. We study the problem of pricing claims written on an over-the-counter energy con- tractPRICING COMMODITY DERIVATIVES WITH BASIS RISK AND PARTIAL OBSERVATIONS REN´E CARMONA AND MICHAEL. Because the underlying is illiquid, we work with an indifference pricing framework based on a liquid

  13. Theoretical Basis of Likelihood Methods in Molecular Phylogenetic Inference

    E-Print Network [OSTI]

    Das, Rhiju

    for molecular data by the maximum-likelihood approach has been attacked from a theoretical point of view is seen to be a classical statistical problem involving selection between composite hypothesesTheoretical Basis of Likelihood Methods in Molecular Phylogenetic Inference Rhiju Das, Centre

  14. Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

    SciTech Connect (OSTI)

    CROWE, R.D.; PIEPHO, M.G.

    2000-03-23T23:59:59.000Z

    This document provided the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report''. All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

  15. Data mining with sparse grids using simplicial basis functions

    E-Print Network [OSTI]

    Sminchisescu, Cristian

    Data mining with sparse grids using simplicial basis functions Jochen Garcke and Michael Griebel we presented a new approach [18] to the classifi- cation problem arising in data mining. It is based with the number of given data points. Finally we report on the quality of the classifier built by our new method

  16. Data mining with sparse grids using simplicial basis functions

    E-Print Network [OSTI]

    Sminchisescu, Cristian

    Data mining with sparse grids using simplicial basis functions Jochen Garcke and Michael Griebel Recently we presented a new approach [18] to the classi#12;- cation problem arising in data mining scales linearly with the number of given data points. Finally we report on the quality of the classi#12

  17. The Dark Energy Survey Data Processing and Calibration System

    E-Print Network [OSTI]

    Mohr, Joseph J; Bertin, Emmanuel; Daues, Gregory E; Desai, Shantanu; Gower, Michelle; Gruendl, Robert; Hanlon, William; Kuropatkin, Nikolay; Lin, Huan; Marriner, John; Petravick, Don; Sevilla, Ignacio; Swanson, Molly; Tomashek, Todd; Tucker, Douglas; Yanny, Brian

    2012-01-01T23:59:59.000Z

    The Dark Energy Survey (DES) is a 5000 deg2 grizY survey reaching characteristic photometric depths of 24th magnitude (10 sigma) and enabling accurate photometry and morphology of objects ten times fainter than in SDSS. Preparations for DES have included building a dedicated 3 deg2 CCD camera (DECam), upgrading the existing CTIO Blanco 4m telescope and developing a new high performance computing (HPC) enabled data management system (DESDM). The DESDM system will be used for processing, calibrating and serving the DES data. The total data volumes are high (~2PB), and so considerable effort has gone into designing an automated processing and quality control system. Special purpose image detrending and photometric calibration codes have been developed to meet the data quality requirements, while survey astrometric calibration, coaddition and cataloging rely on new extensions of the AstrOmatic codes which now include tools for PSF modeling, PSF homogenization, PSF corrected model fitting cataloging and joint mode...

  18. The Supply Chain Management MBA is one of the strategic concentrations at Rutgers Business School. Simply put, Supply Chain Management is how business

    E-Print Network [OSTI]

    Lin, Xiaodong

    chain management study by Gartner Supply Chain Leaders, a survey of how well leading universitiesThe Supply Chain Management MBA is one of the strategic concentrations at Rutgers Business School. Simply put, Supply Chain Management is how business gets done. According to industry analysts

  19. Multidimensional Pattern Matching: A Survey

    E-Print Network [OSTI]

    Amir, Amihood

    Multidimensional Pattern Matching: A Survey Amihood Amir \\Lambda GIT--CC--92/29 July 1992 Abstract for this survey is the problem of searching aerial photographs. The (ambitious) practical goal of this application is to input an aerial photograph and a template of some object (a pattern). The output is all locations

  20. Power Management in Wireless Networks Kevin Klues

    E-Print Network [OSTI]

    Jain, Raj

    Power Management in Wireless Networks Kevin Klues Abstract This paper presents a survey on the various power saving techniques used in wireless networking today. The work presented covers topics at each layer of a wireless networking protocol stack. The types of wireless networks considered include

  1. Just in Time DSA-The Hanford Nuclear Safety Basis Strategy

    SciTech Connect (OSTI)

    Olinger, S. J.; Buhl, A. R.

    2002-02-26T23:59:59.000Z

    The U.S. Department of Energy, Richland Operations Office (RL) is responsible for 30 hazard category 2 and 3 nuclear facilities that are operated by its prime contractors, Fluor Hanford Incorporated (FHI), Bechtel Hanford, Incorporated (BHI) and Pacific Northwest National Laboratory (PNNL). The publication of Title 10, Code of Federal Regulations, Part 830, Subpart B, Safety Basis Requirements (the Rule) in January 2001 imposed the requirement that the Documented Safety Analyses (DSA) for these facilities be reviewed against the requirements of the Rule. Those DSA that do not meet the requirements must either be upgraded to satisfy the Rule, or an exemption must be obtained. RL and its prime contractors have developed a Nuclear Safety Strategy that provides a comprehensive approach for supporting RL's efforts to meet its long term objectives for hazard category 2 and 3 facilities while also meeting the requirements of the Rule. This approach will result in a reduction of the total number of safety basis documents that must be developed and maintained to support the remaining mission and closure of the Hanford Site and ensure that the documentation that must be developed will support: compliance with the Rule; a ''Just-In-Time'' approach to development of Rule-compliant safety bases supported by temporary exemptions; and consolidation of safety basis documents that support multiple facilities with a common mission (e.g. decontamination, decommissioning and demolition [DD&D], waste management, surveillance and maintenance). This strategy provides a clear path to transition the safety bases for the various Hanford facilities from support of operation and stabilization missions through DD&D to accelerate closure. This ''Just-In-Time'' Strategy can also be tailored for other DOE Sites, creating the potential for large cost savings and schedule reductions throughout the DOE complex.

  2. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Yakima River Basin, 1934-1942, Final Report.

    SciTech Connect (OSTI)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1996-01-01T23:59:59.000Z

    This document contains summary reports of stream habitat surveys, conducted in the Yakima River basin, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1934-1942. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al., 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database should be used to assess pool and substrate conditions. This data is available from the Bonneville Power Administration. The Bureau of Fisheries survey is unique because it is the only long-term data set that quantifies fish habitat in a manner that is replicable over time; no other similar work is known to exist. Other surveys, such as Thompson and Haas (1960), inventoried extensive areas in a manner that was mostly qualitative, subjectively estimating physical characteristics like bank cover and stream shading. Spawning, rearing, and resting habitat were not systematically quantified to allow comparisons over time. Knowledge of the past and present quantity and quality of anadromous fish habitat in the Columbia River Basin is essential to any effort to enhance fish populations. Habitat condition is a key element in monitoring and evaluating progress towards the doubling goal. Integration of this information into the Columbia River Fish and Wildlife Plan can provide the baseline information to greatly enhance understanding of past, present, and future habitat conditions in the basin to provide for improved management decisions.

  3. Electrical energy strategies; The survey

    SciTech Connect (OSTI)

    Golden, P. (Dranetz Technologies, Inc., Edison, NJ (US))

    1991-01-01T23:59:59.000Z

    This paper reports that, implementing an effective electrical energy reduction strategy requires a survey of the facility under consideration. The survey's main goals should be to identify where, when and how electricity is being used and to put into action methods to reduce and control costs. A number of important task can also result from this survey, such as the following: verification of building electrical drawing: electrical maintenance techniques; and analyses of electric utility rate schedules. The availability of up-to-date electrical drawing for a building may be nonexistent. The necessity to review and make corrections to these drawings will become evident in considering survey confident that all areas are properly surveyed and that the highest level of safety is maintained.

  4. 1979 year-end electric power survey. [Monograph

    SciTech Connect (OSTI)

    Not Available

    1980-01-01T23:59:59.000Z

    The status of electric power supply, generating facility expansion, and electric power equipment manufacture is presented for 1979 on the basis of an industry survey covering investor-owned systems, public systems, and rural electric cooperatives as well as industrial installations which are interconnected with and supply power to utility systems. A 3.2 increase in generating capacity brought the total to 576.2 million kilowatts, 86 percent of which is thermal and the remainder hydro. Survey data for Hawaii is shown separately. December and summer peak capabilities, peak loads, and capability margins are presented for each of the nine regions. Their relationships to each other, to annual load factor, and to annual kilowatt hour requirements are also shown. Details of the orders placed with manufacturers for heavy power equipment are presented for the years 1975 to 1979. The manufacturing schedules of conventional and nuclear equipment are presented for the years 1979 to 1985. 28 tables. (DCK)

  5. Technical Cost Modeling - Life Cycle Analysis Basis for Program...

    Broader source: Energy.gov (indexed) [DOE]

    1600 1800 Baseline 50% Body and Chassis Wt. Redn. Scenario Weight (kg) Other PolymerComposite Magnesium Aluminum Low Carbon Steel HiMed Steel 1180 1525 8 Managed by UT-Battelle...

  6. FertilizerManagement Agronomy Journal Volume 103, Issue 2 2011 501

    E-Print Network [OSTI]

    van Kessel, Chris

    ). Efficient P fertilizer management is necessary for maintaining the sustainability of these systems-- both in developing efficient P management strategies. Soil and plant tissue tests are often used as a basisFertilizerManagement Agronomy Journal · Volume 103, Issue 2 · 2011 501 Re-Evaluating Diagnostic

  7. Conference Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-01-25T23:59:59.000Z

    The Order establishes requirements and responsibilities for managing conferences sponsored or co-sponsored by the Department of Energy, including the National Nuclear Security Administration. Cancels DOE O 110.3. Canceled by DOE N 251.97.

  8. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  9. Management Analyst

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as a Management Analyst in the Strategy Execution group of the Corporate Strategy organization (SE). The Strategy Execution group develops and coordinates...

  10. Managing Solutions

    E-Print Network [OSTI]

    Baker, Emily

    2007-01-01T23:59:59.000Z

    , and Texas Water --------------------------------------------- Project Managers Cecilia Wagner, Kevin Wagner, Danielle Supercinski, Dr. Bill Fox and Lucas Gregory work to link university researchers and Extension specialists to appropriate funding agen... Irrigators Network. Kevin Wagner, who joined TWRI in 2005 from TSSWCB, has spent several years working with environmental issues. He is currently pursuing his doctorate evaluating best management practices for reducing bacterial runoff from cattle wastes...

  11. Basis for NGNP Reactor Design Down-Selection

    SciTech Connect (OSTI)

    L.E. Demick

    2010-08-01T23:59:59.000Z

    The purpose of this paper is to identify the extent of technology development, design and licensing maturity anticipated to be required to credibly identify differences that could make a technical choice practical between the prismatic and pebble bed reactor designs. This paper does not address a business decision based on the economics, business model and resulting business case since these will vary based on the reactor application. The selection of the type of reactor, the module ratings, the number of modules, the configuration of the balance of plant and other design selections will be made on the basis of optimizing the Business Case for the application. These are not decisions that can be made on a generic basis.

  12. Basis for NGNP Reactor Design Down-Selection

    SciTech Connect (OSTI)

    L.E. Demick

    2011-11-01T23:59:59.000Z

    The purpose of this paper is to identify the extent of technology development, design and licensing maturity anticipated to be required to credibly identify differences that could make a technical choice practical between the prismatic and pebble bed reactor designs. This paper does not address a business decision based on the economics, business model and resulting business case since these will vary based on the reactor application. The selection of the type of reactor, the module ratings, the number of modules, the configuration of the balance of plant and other design selections will be made on the basis of optimizing the Business Case for the application. These are not decisions that can be made on a generic basis.

  13. The SU(3) Algebra in a Cyclic Basis

    E-Print Network [OSTI]

    P. F. Harrison; R. Krishnan; W. G. Scott

    2014-07-31T23:59:59.000Z

    With the couplings between the eight gluons constrained by the structure constants of the su(3) algebra in QCD, one would expect that there should exist a special basis (or set of bases) for the algebra wherein, unlike in a Cartan-Weyl basis, {\\em all} gluons interact identically (cyclically) with each other, explicitly on an equal footing. We report here particular such bases, which we have found in a computer search, and we indicate associated $3 \\times 3$ representations. We conjecture that essentially all cyclic bases for su(3) may be obtained from these making appropriate circulant transformations,and that cyclic bases may also exist for other su(n), n>3.

  14. MIXING OF INCOMPATIBLE MATERIALS IN WASTE TANKS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    SANDGREN, K.R.

    2003-10-15T23:59:59.000Z

    This document presents onsite radiological, onsite toxicological, and offsite toxicological consequences, risk binning, and control decision results for the mixing of incompatible materials in waste tanks representative accident. This technical basis document was developed to support the tank farms documented safety analysis (DSA) and describes the risk binning process, the technical basis for assigning risk bins, and the controls selected for the mixing of incompatible materials representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls.

  15. Technical basis document for the evaporator dump accident

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-03-22T23:59:59.000Z

    This technical basis document was developed to support the documented safety analysis (DSA) and describes the risk binning process and the technical basis for assigning risk bins for the evaporator dump representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR-level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  16. Mixing of incompatible materials in waste tanks technical basis document

    SciTech Connect (OSTI)

    SANDGREN, K.R.

    2003-03-21T23:59:59.000Z

    This technical basis document was developed to support the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process, the technical basis for assigning risk bins, and the controls selected for the mixing of incompatible materials representative accident and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSCs) and/or technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous conditions based on an evaluation of the frequency and consequence. Note that the risk binning process is not applied to facility workers, because all facility worker hazardous conditions are considered for safety-significant SSCs and/or TSR level controls. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, ''Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses'', as described in this report.

  17. Survey of protected terrestrial vertebrates on the Oak Ridge Reservation. Final report

    SciTech Connect (OSTI)

    Mitchell, J.M.; Vail, E.R.; Webb, J.W.; Evans, J.W. [and others

    1996-07-01T23:59:59.000Z

    This document is the final report on surveys of protected terrestrial vertebrates on the Oak Ridge Reservation (ORR) conducted from October 1994 through May 1996. The surveys were undertaken to gain information that could help prevent or minimize the potential impacts of projects on the ORR to species listed by the state or federal government as endangered, threatened, or in need of management; federal species of concern were also included. The results of the survey will assist in the effective management of the natural resources of the ORR. Currently, there are 69 species of federal or state listed terrestrial vertebrates (20 reptiles and amphibians, 20 mammals, and 29 birds) that may occur in Tennessee. Listed animal species that might be present on the ORR were targeted for survey using a prioritization system based on historical and recent sightings, known species distributions, presence of suitable habitat, literature reviews, and personal communications. Survey methods included trapping, seining, monitoring of artificial covers, active searching, and avian surveys. Surveys were conducted during the time of year when each targeted species was most likely to be encountered. The surveys confirmed the presence of 20 threatened and endangered species on the ORR. This report also includes some ancillary information. Records are provided for nonlisted species (44 species of reptiles and amphibians, 155 species of birds, and 28 species of mammals). Categorization of survey sites into 1 or more of 19 habitat types, which are briefly described, is presented. Notes are summarized on the occurrence of threatened and endangered species on the ORR. Finally, this report also lists threatened and endangered species not found that might be located by additional surveys, recommends three survey areas for natural-area status due to wildlife value, and suggests several avenues for future work.

  18. The Neural Basis of Financial Risk-Taking* Supplementary Material

    E-Print Network [OSTI]

    Knutson, Brian

    1 The Neural Basis of Financial Risk-Taking* Supplementary Material Camelia M. Kuhnen1 and Brian in each block, a rational risk-neutral agent should pick stock i if he/she expects to receive a dividend D is the information set up to trial -1. That is: I-1 ={D i t| t-1, i{Stock T, Stock R, Bond C}}. Let x i = Pr{ Stock

  19. Use of Normalized Radial Basis Function in Hydrology

    SciTech Connect (OSTI)

    Cotar, Anton; Brilly, Mitja [Chair of Hydrology and Hydraulic Engineering, University of Ljubljana, Jamova 2, 1000 Ljubljana (Slovenia)

    2008-11-13T23:59:59.000Z

    In this article we will present a use of normalized radial basis function in hydrology for prediction of missing river Reka runoff data. The method is based on multidimensional normal distribution, where standard deviation is first optimized and later the whole prediction process is learned on existing data [5]. We can conclude, that the method works very well for middle ranges of data, but not so well for extremes because of its interpolating nature.

  20. Thermostat Interface and Usability: A Survey

    E-Print Network [OSTI]

    Meier, Alan

    2011-01-01T23:59:59.000Z

    Administration (EIA), 2005) No national survey is yetSurvey, from http://www.gotoemerson.com Energy Information Administration (EIA) (Survey: Preliminary Housing Characteristics Tables, 2009 Energy Information Administration (EIA) (

  1. CRITICALITY SAFETY CONTROLS AND THE SAFETY BASIS AT PFP

    SciTech Connect (OSTI)

    Kessler, S

    2009-04-21T23:59:59.000Z

    With the implementation of DOE Order 420.1B, Facility Safety, and DOE-STD-3007-2007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities', a new requirement was imposed that all criticality safety controls be evaluated for inclusion in the facility Documented Safety Analysis (DSA) and that the evaluation process be documented in the site Criticality Safety Program Description Document (CSPDD). At the Hanford site in Washington State the CSPDD, HNF-31695, 'General Description of the FH Criticality Safety Program', requires each facility develop a linking document called a Criticality Control Review (CCR) to document performance of these evaluations. Chapter 5, Appendix 5B of HNF-7098, Criticality Safety Program, provided an example of a format for a CCR that could be used in lieu of each facility developing its own CCR. Since the Plutonium Finishing Plant (PFP) is presently undergoing Deactivation and Decommissioning (D&D), new procedures are being developed for cleanout of equipment and systems that have not been operated in years. Existing Criticality Safety Evaluations (CSE) are revised, or new ones written, to develop the controls required to support D&D activities. Other Hanford facilities, including PFP, had difficulty using the basic CCR out of HNF-7098 when first implemented. Interpretation of the new guidelines indicated that many of the controls needed to be elevated to TSR level controls. Criterion 2 of the standard, requiring that the consequence of a criticality be examined for establishing the classification of a control, was not addressed. Upon in-depth review by PFP Criticality Safety staff, it was not clear that the programmatic interpretation of criterion 8C could be applied at PFP. Therefore, the PFP Criticality Safety staff decided to write their own CCR. The PFP CCR provides additional guidance for the evaluation team to use by clarifying the evaluation criteria in DOE-STD-3007-2007. In reviewing documents used in classifying controls for Nuclear Safety, it was noted that DOE-HDBK-1188, 'Glossary of Environment, Health, and Safety Terms', defines an Administrative Control (AC) in terms that are different than typically used in Criticality Safety. As part of this CCR, a new term, Criticality Administrative Control (CAC) was defined to clarify the difference between an AC used for criticality safety and an AC used for nuclear safety. In Nuclear Safety terms, an AC is a provision relating to organization and management, procedures, recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility. A CAC was defined as an administrative control derived in a criticality safety analysis that is implemented to ensure double contingency. According to criterion 2 of Section IV, 'Linkage to the Documented Safety Analysis', of DOESTD-3007-2007, the consequence of a criticality should be examined for the purposes of classifying the significance of a control or component. HNF-PRO-700, 'Safety Basis Development', provides control selection criteria based on consequence and risk that may be used in the development of a Criticality Safety Evaluation (CSE) to establish the classification of a component as a design feature, as safety class or safety significant, i.e., an Engineered Safety Feature (ESF), or as equipment important to safety; or merely provides defense-in-depth. Similar logic is applied to the CACs. Criterion 8C of DOE-STD-3007-2007, as written, added to the confusion of using the basic CCR from HNF-7098. The PFP CCR attempts to clarify this criterion by revising it to say 'Programmatic commitments or general references to control philosophy (e.g., mass control or spacing control or concentration control as an overall control strategy for the process without specific quantification of individual limits) is included in the PFP DSA'. Table 1 shows the PFP methodology for evaluating CACs. This evaluation process has been in use since February of 2008 and has proven to be simple and effective. Each control identified i

  2. Evolution of Safety Basis Documentation for the Fernald Site

    SciTech Connect (OSTI)

    Brown, T.; Kohler, S.; Fisk, P.; Krach, F.; Klein, B.

    2004-03-01T23:59:59.000Z

    The objective of the Department of Energy's (DOE) Fernald Closure Project (FCP), in suburban Cincinnati, Ohio, is to safely complete the environmental restoration of the Fernald site by 2006. Over 200 out of 220 total structures, at this DOE plant site which processed uranium ore concentrates into high-purity uranium metal products, have been safely demolished, including eight of the nine major production plants. Documented Safety Analyses (DSAs) for these facilities have gone through a process of simplification, from individual operating Safety Analysis Reports (SARs) to a single site-wide Authorization Basis containing nuclear facility Bases for Interim Operations (BIOs) to individual project Auditable Safety Records (ASRs). The final stage in DSA simplification consists of project-specific Integrated Health and Safety Plans (I-HASPs) and Nuclear Health and Safety Plans (N-HASPs) that address all aspects of safety, from the worker in the field to the safety basis requirements preserving the facility/activity hazard categorization. This paper addresses the evolution of Safety Basis Documentation (SBD), as DSAs, from production through site closure.

  3. Summary Report for Bureau of Fisheries Stream Habitat Surveys : Clearwater, Salmon, Weiser, and Payette River Basins, 1934-1942, Final Report.

    SciTech Connect (OSTI)

    McIntosh, Bruce A.; Clark, Sharon E.; Sedell, James R.

    1995-01-01T23:59:59.000Z

    This document contains summary reports of stream habitat surveys, conducted in Idaho, by the Bureau of Fisheries (BOF, now National Marine Fisheries Service) from 1938-1942.. These surveys were part of a larger project to survey streams in the Columbia River basin that provided, or had provided, spawning and rearing habitat for salmon and steelhead (Rich, 1948). The purpose of the survey was, as described by Rich, 'to determine the present condition of the various tributaries with respect to their availability and usefulness for the migration, breeding, and rearing of migratory fishes'. The Idaho portion of the survey consisted of extensive surveys of the Clearwater, Salmon, Weiser, and Payette River Subbasins. Current estimates of the loss of anadromous fish habitat in the Columbia River Basin are based on a series of reports published from 1949-1952 by the U.S. Fish and Wildlife Service. The reports were brief, qualitative accounts of over 5000 miles of stream surveys conducted by the BOF from 1934-1946 (Bryant, 1949; Bryant and Parkhurst, 1950; Parkhurst, 1950a-c; Parkhurst et al., 1950). Despite their brevity, these BOF reports have formed the basis for estimating fish habitat losses and conditions in the Columbia River Basin (Fulton, 1968, 1970; Thompson, 1976; NPPC, 1986). Recently, the field notebooks from the BOF surveys were discovered. The data is now archived and stored in the Forest Science DataBank at Oregon State University (Stafford et al., 1984; 1988). These records are the earliest and most comprehensive documentation available of the condition and extent of anadromous fish habitat before hydropower development in the Columbia River Basin. They provide the baseline data for quantifying changes and setting a benchmark for future restoration of anadromous fish habitat throughout the Basin. The summaries contained in this book are exact replicates of the originals. Due to discrepancies between the field data and the summaries, the database should be used to assess pool and substrate conditions. This data is available from the Bonneville Power Administration. The Bureau of Fisheries survey is unique because it is the only long-term data set that quantifies fish habitat in a manner that is replicable over time; no other similar work is known to exist. Other surveys, such as Thompson and Haas (1960), inventoried extensive areas in a manner that was mostly qualitative, subjectively estimating physical characteristics like bank cover and stream shading. Spawning, rearing, and resting habitat were not systematically quantified to allow comparisons over time. Knowledge of the past and present quantity and quality of anadromous fish habitat in the Columbia River Basin is essential to any effort to enhance fish populations. Habitat condition is a key element in monitoring and evaluating progress towards the doubling goal. Integration of this information into the Columbia River Fish and Wildlife Plan can provide the baseline information to greatly enhance understanding of past, present, and future habitat conditions in the basin to provide for improved management decisions.

  4. Transfer Guide: Forest Management -1 -Revised: 10 August 2012 TRANSFER GUIDE AND PLANNING WORKSHEET

    E-Print Network [OSTI]

    Transfer Guide: Forest Management - 1 - Revised: 10 August 2012 TRANSFER GUIDE AND PLANNING management concentration This planning worksheet represents a guide for community college students-Hrs Grade MAT 125 Survey of Calculus 4 #12;Transfer Guide: Forest Management - 2 - Revised: 10 August 2012

  5. Posted 911/12 **Notice of Job Opportunities: Accenture Contract Management Positions**

    E-Print Network [OSTI]

    Heller, Barbara

    the secondmostadmired company in contract management in a survey conducted by the International AssociationPosted 911/12 **Notice of Job Opportunities: Accenture Contract Management Positions** Accenture is hiring! Accenture is hiring! We are searching for Contract Management professionals looking

  6. SDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta

    E-Print Network [OSTI]

    innovations. In this survey paper, by reviewing existing SDN management layers (platforms), we identifySDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta Computer­006 Abstract---Computer networks are becoming more and more complex and difficult to manage. The research

  7. How important are landownership and the scale(s) of forest management and governance for

    E-Print Network [OSTI]

    ­ Forester interviews (27) ­ Landowner survey and GIS #12;#12;#12;Forest management typology · 22 SitesHow important are landownership and the scale(s) of forest management and governance-matches and resilience · Research questions and methods · A typology of forest management · Constraints and opportunities

  8. Type Toyota Management Systems (MSTT) of small and medium-sized enterprises in mechanical and electrical

    E-Print Network [OSTI]

    Boyer, Edmond

    of a study, dealing with the topic of Type Toyota Management Systems. In the survey SMEs in mechanicalType Toyota Management Systems (MSTT) of small and medium-sized enterprises in mechanical; Institute of Industrial Manufacturing and Management (IFF), University of Stuttgart, Nobelstr. 12, D-70569

  9. SDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta

    E-Print Network [OSTI]

    innovations. In this survey paper, by reviewing existing SDN management layers (platforms), we identifySDN Management Layer: Design Requirements and Future Direction Yuefeng Wang Ibrahim Matta Computer-006 Abstract--Computer networks are becoming more and more complex and difficult to manage. The research

  10. Human-system Interfaces to Automatic Systems: Review Guidance and Technical Basis

    SciTech Connect (OSTI)

    OHara, J.M.; Higgins, J.C.

    2010-01-31T23:59:59.000Z

    Automation has become ubiquitous in modern complex systems and commercial nuclear power plants are no exception. Beyond the control of plant functions and systems, automation is applied to a wide range of additional functions including monitoring and detection, situation assessment, response planning, response implementation, and interface management. Automation has become a 'team player' supporting plant personnel in nearly all aspects of plant operation. In light of the increasing use and importance of automation in new and future plants, guidance is needed to enable the NRC staff to conduct safety reviews of the human factors engineering (HFE) aspects of modern automation. The objective of the research described in this report was to develop guidance for reviewing the operator's interface with automation. We first developed a characterization of the important HFE aspects of automation based on how it is implemented in current systems. The characterization included five dimensions: Level of automation, function of automation, modes of automation, flexibility of allocation, and reliability of automation. Next, we reviewed literature pertaining to the effects of these aspects of automation on human performance and the design of human-system interfaces (HSIs) for automation. Then, we used the technical basis established by the literature to develop design review guidance. The guidance is divided into the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, we identified insights into the automaton design process, operator training, and operations.

  11. Business Management Analyst Business Manager Director of Communication Contracts Manager

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    · Business Management Analyst · Business Manager · Director of Communication · Contracts Manager of Sales · President/Owner · Instructor of Business · Senior Buyer · North American Sales Manager · Talent graduation. You will have the skills & knowledge to manage and grow a successful business. You will be able

  12. CONSULTANT REPORT APPLIANCE MARKET SURVEY

    E-Print Network [OSTI]

    found at retail/wholesale stores, Internet sites, and in catalogs. This report delineates the degree.....................................................................................................................5 Retail/Wholesale Store Surveys ..........................................................................................................5 Retail/Wholesale Store Site Selection ..................................

  13. A Survey of Automated Deduction 

    E-Print Network [OSTI]

    Bundy, Alan

    We survey research in the automation of deductive inference, from its beginnings in the early history of computing to the present day. We identify and describe the major areas of research interest and their applications. ...

  14. A survey of structures on

    E-Print Network [OSTI]

    Choi, Suhyoung

    Euclidean geometry Spherical geometry Manifolds with geometric structures: manifolds need some canonical canonical descriptions.. Manifolds with (real) projective structures Outline Survey: Classical geometries's philosphy) Spherical geometry: Greek astronomy, Gauss, Riemann Hyperbolic geometry: Bolyai, Lobachevsky

  15. Environmental Survey preliminary report, Oak Ridge National Laboratory (X-10), Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1988-07-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL), X-10 site, conducted August 17 through September 4, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ORNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for ORNL. The Interim Report will reflect the final determinations of the ORNL Survey. 120 refs., 68 figs., 71 tabs.

  16. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1989-02-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  17. Environmental Survey preliminary report, Princeton Plasma Physics Laboratory, Princeton, New Jersey

    SciTech Connect (OSTI)

    Not Available

    1989-05-01T23:59:59.000Z

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Princeton Plasma Physics Laboratory (PPPL), conducted June 13 through 17, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team members are being provided by private contractors. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with PPPL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at PPPL, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain of the environment problems identified during its on-site activities. The S A plan is being developed by the Idaho National Engineering Laboratory. When completed, the S A results will be incorporated into the PPPL Survey findings for inclusion in the Environmental Survey Summary Report. 70 refs., 17 figs., 21 tabs.

  18. Environmental Survey preliminary report, Los Alamos National Laboratory, Los Alamos, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Los Alamos National Laboratory (LANL), conducted March 29, 1987 through April 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the LANL, and interviews with site personnel. The Survey team developed Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Idaho National Engineering Laboratory. When completed, the results will be incorporated into the LANL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the LANL. 65 refs., 68 figs., 73 tabs.

  19. Analysis of waste treatment requirements for DOE mixed wastes: Technical basis

    SciTech Connect (OSTI)

    NONE

    1995-02-01T23:59:59.000Z

    The risks and costs of managing DOE wastes are a direct function of the total quantities of 3wastes that are handled at each step of the management process. As part of the analysis of the management of DOE low-level mixed wastes (LLMW), a reference scheme has been developed for the treatment of these wastes to meet EPA criteria. The treatment analysis in a limited form was also applied to one option for treatment of transuranic wastes. The treatment requirements in all cases analyzed are based on a reference flowsheet which provides high level treatment trains for all LLMW. This report explains the background and basis for that treatment scheme. Reference waste stream chemical compositions and physical properties including densities were established for each stream in the data base. These compositions are used to define the expected behavior for wastes as they pass through the treatment train. Each EPA RCRA waste code was reviewed, the properties, chemical composition, or characteristics which are of importance to waste behavior in treatment were designated. Properties that dictate treatment requirements were then used to develop the treatment trains and identify the unit operations that would be included in these trains. A table was prepared showing a correlation of the waste physical matrix and the waste treatment requirements as a guide to the treatment analysis. The analysis of waste treatment loads is done by assigning wastes to treatment steps which would achieve RCRA compliant treatment. These correlation`s allow one to examine the treatment requirements in a condensed manner and to see that all wastes and contaminant sets are fully considered.

  20. 2010 Ecological Survey of the Pacific Northwest National Laboratory Site

    SciTech Connect (OSTI)

    Chamness, Michele A.; Perry, Christopher; Downs, Janelle L.; Powell, Sylvia D.

    2011-02-16T23:59:59.000Z

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL Site is described in Larson and Downs (2009). There are currently two facilities on the PNNL Site: the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), and the recently completed Physical Sciences Facility (PSF). This report describes the results of the annual survey of the biological resources found on the undeveloped portions of the PNNL Site in 2010. A brief description of the methods PNNL ecologists used to conduct the surveys and the results of the surveys are presented. Actions taken to fully delineate noxious weed populations discovered in 2009 and efforts in 2010 to control those weeds also are described. Appendix A provides a list of plant and animal species identified on the PNNL Site.

  1. Avian survey and field guide for Osan Air Base, Korea.

    SciTech Connect (OSTI)

    Levenson, J.

    2006-12-05T23:59:59.000Z

    This report summarizes the results of the avian surveys conducted at Osan Air Base (AB). This ongoing survey is conducted to comply with requirements of the Environmental Governing Standards (EGS) for the Republic of Korea, the Integrated Natural Resources Management Plan (INRMP) for Osan AB, and the 51st Fighter Wing's Bird Aircraft Strike Hazard (BASH) Plan. One hundred ten bird species representing 35 families were identified and recorded. Seven species are designated as Natural Monuments, and their protection is accorded by the Korean Ministry of Culture and Tourism. Three species appear on the Korean Association for Conservation of Nature's (KACN's) list of Reserved Wild Species and are protected by the Korean Ministry of Environment. Combined, ten different species are Republic of Korea (ROK)-protected. The primary objective of the avian survey at Osan AB was to determine what species of birds are present on the airfield and their respective habitat requirements during the critical seasons of the year. This requirement is specified in Annex J.14.c of the 51st Fighter BASH Plan 91-212 (51 FW OPLAN 91-212). The second objective was to initiate surveys to determine what bird species are present on Osan AB throughout the year and from the survey results, determine if threatened, endangered, or other Korean-listed bird species are present on Osan AB. This overall census satisfies Criterion 13-3.e of the EGS for Korea. The final objective was to formulate management strategies within Osan AB's operational requirements to protect and enhance habitats of known threatened, endangered, and ROK-protected species in accordance with EGS Criterion 13-3.a that are also favorable for the reproduction of indigenous species in accordance with the EGS Criterion 13-3.h.

  2. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    SciTech Connect (OSTI)

    CLEVELAND, K.J.

    2000-08-17T23:59:59.000Z

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

  3. RELEASE OF DRIED RADIOACTIVE WASTE MATERIALS TECHNICAL BASIS DOCUMENT

    SciTech Connect (OSTI)

    KOZLOWSKI, S.D.

    2007-05-30T23:59:59.000Z

    This technical basis document was developed to support RPP-23429, Preliminary Documented Safety Analysis for the Demonstration Bulk Vitrification System (PDSA) and RPP-23479, Preliminary Documented Safety Analysis for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Facility. The main document describes the risk binning process and the technical basis for assigning risk bins to the representative accidents involving the release of dried radioactive waste materials from the Demonstration Bulk Vitrification System (DBVS) and to the associated represented hazardous conditions. Appendices D through F provide the technical basis for assigning risk bins to the representative dried waste release accident and associated represented hazardous conditions for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Packaging Unit (WPU). The risk binning process uses an evaluation of the frequency and consequence of a given representative accident or represented hazardous condition to determine the need for safety structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls. A representative accident or a represented hazardous condition is assigned to a risk bin based on the potential radiological and toxicological consequences to the public and the collocated worker. Note that the risk binning process is not applied to facility workers because credible hazardous conditions with the potential for significant facility worker consequences are considered for safety-significant SSCs and/or TSR-level controls regardless of their estimated frequency. The controls for protection of the facility workers are described in RPP-23429 and RPP-23479. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described below.

  4. Interim safety basis for fuel supply shutdown facility

    SciTech Connect (OSTI)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-05-23T23:59:59.000Z

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings.

  5. SRS FTF Section 3116 Basis for Determination | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSARDevelopmental AssignmentApril 2, 2015AwardsOctoberBasis for

  6. Risk Management Policy Category: Strategic Management

    E-Print Network [OSTI]

    1 Risk Management Policy Category: Strategic Management 1. PURPOSE To support the University will be encouraged to speak openly and honestly. (iii) Managers will monitor risk and will disclose risks identified's risk appetite. 2.3. Risk management standards 2.3.1 The University's risk management framework

  7. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect (OSTI)

    Rathbone, Bruce A.

    2005-02-25T23:59:59.000Z

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at Hanford. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with 10 CFR 835, DOELAP, DOE-RL, ORP, PNSO, and Hanford contractor requirements. The dosimetry system is operated by PNNL’s Hanford External Dosimetry Program which provides dosimetry services to all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. Rev. 0 marks the first revision to be released through PNNL’s Electronic Records & Information Capture Architecture (ERICA) database.

  8. Climate Survey Original TemplateClimate Survey Original TemplateClimate Survey Original TemplateClimate Survey Original Template The Chair of the Department of DEPT NAME, NAME, is dedicated to improving workplace climate in your office. As part

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Climate Survey Original TemplateClimate Survey Original TemplateClimate Survey Original TemplateClimate Survey Original Template The Chair of the Department of DEPT NAME, NAME, is dedicated to improving Survey Original TemplateClimate Survey Original TemplateClimate Survey Original TemplateClimate Survey

  9. Energy Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000Consumption Survey (CBECS) Data 210 Available in4LiBNEnergy

  10. Environmental Management System Plan

    E-Print Network [OSTI]

    Fox, Robert

    2009-01-01T23:59:59.000Z

    Management Program, R-3 • Environmental Management SystemEnvironmental policy 3. Environmental aspects 4. Legal andObjectives, targets, and Environmental Management Programs

  11. Data Management Policy | EMSL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Management Policy Data Management Policy The data management resource information and data release policies below are provided to help researchers understand the data...

  12. NERSC Data Management Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Management Policies NERSC Data Management Policies Introduction NERSC provides its users with the means to store, manage, and share their research data products. In addition...

  13. Survey of EPA facilities for solar thermal energy applications. Final report 1 Nov 77-30 Jun 78

    SciTech Connect (OSTI)

    Nelson, E.V.; Overly, P.T.; Bell, D.M.

    1980-10-01T23:59:59.000Z

    A study was done to assess the feasibility of applying solar thermal energy systems to EPA facilities. A survey was conducted to determine those EPA facilities where solar energy could best be used. These systems were optimized for each specific application and the system/facility combinations were ranked on the basis of greatest cost effectiveness.

  14. Office of Legacy Management FY 2009 Energy Management Data Report...

    Office of Environmental Management (EM)

    Office of Legacy Management FY 2009 Energy Management Data Report Office of Legacy Management FY 2009 Energy Management Data Report FY 2009 Energy Management Performance Summary...

  15. Natural language processing-based COTS software and related technologies survey.

    SciTech Connect (OSTI)

    Stickland, Michael G.; Conrad, Gregory N.; Eaton, Shelley M.

    2003-09-01T23:59:59.000Z

    Natural language processing-based knowledge management software, traditionally developed for security organizations, is now becoming commercially available. An informal survey was conducted to discover and examine current NLP and related technologies and potential applications for information retrieval, information extraction, summarization, categorization, terminology management, link analysis, and visualization for possible implementation at Sandia National Laboratories. This report documents our current understanding of the technologies, lists software vendors and their products, and identifies potential applications of these technologies.

  16. 2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

    SciTech Connect (OSTI)

    Becker, James M.; Chamness, Michele A.

    2012-02-27T23:59:59.000Z

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the upland areas of the PNNL site in 2011. Efforts in 2011 to control noxious weed populations (comprising plant species designated as Class B noxious weeds by the Washington State Noxious Weed Control Board) discovered in 2009 and initially treated with herbicides in 2010 are described in Appendix B.

  17. MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT

    E-Print Network [OSTI]

    of solid and liquid wastes generated at mushroom producing facilities. Environmental guidelines#12;MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT PHASE I: AUDIT OF CURRENT PRACTICE The Mushroom Waste Management Project (MWMP) was initiated by Environment Canada, the BC Ministry

  18. MATERIALS MANAGEMENT MATERIALS MANAGEMENT -INVENTORY CONTROL

    E-Print Network [OSTI]

    Oliver, Douglas L.

    MATERIALS MANAGEMENT MATERIALS MANAGEMENT - INVENTORY CONTROL Record of Property Transferred from ______ ___________________________________ 2. DEAN (If Applies) ______ ___________________________________ 5. UNIVERSITY DIRECTOR OF MATERIALS MANAGEMENT ______ ___________________________________ 3. HOSPITAL DIRECTOR (If Applies) ______ IF YOU NEED

  19. Social Networks and Online Privacy Concerns Survey The Social Networks and Online Privacy Concerns Survey

    E-Print Network [OSTI]

    Kaiser, Gail E.

    Social Networks and Online Privacy Concerns Survey The Social Networks and Online Privacy Concerns Survey The Social Networks and Online Privacy Concerns Survey is part of a research project survey #12;0% 100% Yes Unsure No Yes Unsure No Social Networks and Online Privacy Concerns Survey

  20. Managing Critical Management Improvement Initiatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-01T23:59:59.000Z

    Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

  1. Water resource management planning guide for Savannah River Plant

    SciTech Connect (OSTI)

    Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.); Gordon, D.E. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant)

    1988-10-01T23:59:59.000Z

    The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

  2. Environmental Survey Report for ORNL: Small Mammal Abundance and Distribution Survey Oak Ridge National Environmental Research Park 2009 - 2010

    SciTech Connect (OSTI)

    Giffen, Neil R [ORNL; Reasor, R. Scott [Oak Ridge Institute for Science and Education (ORISE); Campbell, Claire L. [Oak Ridge Institute for Science and Education (ORISE)

    2009-12-01T23:59:59.000Z

    This report summarizes a 1-year small mammal biodiversity survey conducted on the Oak Ridge National Environmental Research Park (OR Research Park). The task was implemented through the Oak Ridge National Laboratory (ORNL) Natural Resources Management Program and included researchers from the ORNL Environmental Sciences Division, interns in the Oak Ridge Institute for Science and Education Higher Education Research Experiences Program, and ORNL Environmental Protection Services staff. Eight sites were surveyed reservation wide. The survey was conducted in an effort to determine species abundance and diversity of small mammal populations throughout the reservation and to continue the historical inventory of small mammal presence for biodiversity records. This data collection effort was in support of the approved Wildlife Management Plan for the Oak Ridge Reservation, a major goal of which is to maintain and enhance wildlife biodiversity on the Reservation. Three of the sites (Poplar Creek, McNew Hollow, and Deer Check Station Field) were previously surveyed during a major natural resources inventory conducted in 1996. Five new sites were included in this study: Bearden Creek, Rainy Knob (Natural Area 21), Gum Hollow, White Oak Creek and Melton Branch. The 2009-2010 small mammal surveys were conducted from June 2009 to July 2010 on the Oak Ridge National Environmental Research Park (OR Research Park). The survey had two main goals: (1) to determine species abundance and diversity and (2) to update historical records on the OR Research Park. The park is located on the Department of Energy-owned Oak Ridge Reservation, which encompasses 13,580 ha. The primary focus of the study was riparian zones. In addition to small mammal sampling, vegetation and coarse woody debris samples were taken at certain sites to determine any correlations between habitat and species presence. During the survey all specimens were captured and released using live trapping techniques including Sherman and pitfall traps. In total 227 small mammals representing nine species were captured during the course of the study. The most common species found in the study was the white-footed mouse (Peromyscus leucopus). The least common species found were the deer mouse (Peromyscus maniculatus), meadow jumping mouse (Zapus hudsonius), woodland vole (Microtus pinetorum), and northern short-tailed shrew (Blarina brevicauda).

  3. Best Management Practice #1: Water Management Planning

    Broader source: Energy.gov [DOE]

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  4. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Technical Review Report: Oak Ridge Reservation Review of the Environmental Management Waste Management Facility (EMWMF) at Oak Ridge By Craig H. Benson, PhD, PE; William H....

  5. Stormwater Management 

    E-Print Network [OSTI]

    Jaber, Fouad

    2008-10-23T23:59:59.000Z

    . Stormwater also may wash bacteria and other pathogens into swimming areas, creating health hazards that often close beaches. Stormwater may carry debris, such as plastic bags, six-pack rings, and cigarette butts, into water bodies; such debris can choke... the development and implementation of best management practices (BMPs) and achievement of measurable goals at levels sufficient to satisfy each of six minimum control measures and an optional seventh control measure: 1. Public education and outreach...

  6. Electronic structure basis for the titanic magnetoresistance in WTe?

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pletikosic, I.; Ali, Mazhar N.; Fedorov, A. V.; Cava, R. J.; Valla, T.

    2014-11-01T23:59:59.000Z

    The electronic structure basis of the extremely large magnetoresistance in layered non-magnetic tungsten ditelluride has been investigated by angle-resolved photoelectron spectroscopy. Hole and electron pockets of approximately the same size were found at the Fermi level, suggesting that carrier compensation should be considered the primary source of the effect. The material exhibits a highly anisotropic, quasi one-dimensional Fermi surface from which the pronounced anisotropy of the magnetoresistance follows. A change in the Fermi surface with temperature was found and a high-density-of-states band that may take over conduction at higher temperatures and cause the observed turn-on behavior of the magnetoresistance inmore »WTe? was identified.« less

  7. Electronic structure basis for the titanic magnetoresistance in WTe?

    SciTech Connect (OSTI)

    Pletikosic, I. [Princeton Univ., NJ (United States); Brookhaven National Lab. (BNL), Upton, NY (United States); Ali, Mazhar N. [Princeton Univ., NJ (United States); Fedorov, A. V. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cava, R. J. [Princeton Univ., NJ (United States); Valla, T. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2014-11-01T23:59:59.000Z

    The electronic structure basis of the extremely large magnetoresistance in layered non-magnetic tungsten ditelluride has been investigated by angle-resolved photoelectron spectroscopy. Hole and electron pockets of approximately the same size were found at the Fermi level, suggesting that carrier compensation should be considered the primary source of the effect. The material exhibits a highly anisotropic, quasi one-dimensional Fermi surface from which the pronounced anisotropy of the magnetoresistance follows. A change in the Fermi surface with temperature was found and a high-density-of-states band that may take over conduction at higher temperatures and cause the observed turn-on behavior of the magnetoresistance in WTe? was identified.

  8. The Gaussian Radial Basis Function Method for Plasma Kinetic Theory

    E-Print Network [OSTI]

    Hirvijoki, Eero; Belli, Emily; Embréus, Ola

    2015-01-01T23:59:59.000Z

    A fundamental macroscopic description of a magnetized plasma is the Vlasov equation supplemented by the nonlinear inverse-square force Fokker-Planck collision operator [Rosenbluth et al., Phys. Rev., 107, 1957]. The Vlasov part describes advection in a six-dimensional phase space whereas the collision operator involves friction and diffusion coefficients that are weighted velocity-space integrals of the particle distribution function. The Fokker-Planck collision operator is an integro-differential, bilinear operator, and numerical discretization of the operator is far from trivial. In this letter, we describe a new approach to discretize the entire kinetic system based on an expansion in Gaussian Radial Basis functions (RBFs). This approach is particularly well-suited to treat the collision operator because the friction and diffusion coefficients can be analytically calculated. Although the RBF method is known to be a powerful scheme for the interpolation of scattered multidimensional data, Gaussian RBFs also...

  9. Facility Approvals, Security Surveys, and Nuclear Materials Surveys

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-02-03T23:59:59.000Z

    To establish the Department of Energy (DOE) requirements for granting facility approvals prior to permitting safeguards and security interests on the premises and the conduct of on-site security and/or nuclear material surveys of facilities with safeguards and security interests. Cancels DOE O 5630.7 and DOE O 5634.1. Canceled by DOE 5634.1B.

  10. Facility Approvals, Security Surveys, and Nuclear Materials Surveys

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-09-15T23:59:59.000Z

    To establish Department of Energy (DOE) requirements for granting facility approvals prior to permitting safeguards and security interests on the premises and the conduct of insite security and/or nuclear material surveys of facilities with safeguards and security interests. Cancels DOE 5634.1A. Canceled by DOE O 470.1 dated 9-28-95.

  11. Student Survey Items (Survey names listed in blue)

    E-Print Network [OSTI]

    Baltisberger, Jay H.

    by Topical Area: Admissions Berea-Specific Entering Survey, Fall Term First-Year Students and New Transfers community? Cooperative Institutional Research Program (CIRP), Entering Fall Term Students 2010 transfer students) Education Opportunity Center Educational Talent Search Upward Bound Upward Bound

  12. Environmental Management

    ScienceCinema (OSTI)

    None

    2015-01-07T23:59:59.000Z

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  13. Environmental Management

    SciTech Connect (OSTI)

    None

    2014-11-12T23:59:59.000Z

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  14. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect (OSTI)

    Rathbone, Bruce A.

    2009-08-28T23:59:59.000Z

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at Hanford. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with 10 CFR 835, DOELAP, DOE-RL, ORP, PNSO, and Hanford contractor requirements. The dosimetry system is operated by PNNL’s Hanford External Dosimetry Program (HEDP) which provides dosimetry services to all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee (HPDAC) which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture (ERICA) database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document.

  15. A Survey of Architectural Techniques For Improving Cache Power Efficiency

    SciTech Connect (OSTI)

    Mittal, Sparsh [ORNL] [ORNL

    2013-01-01T23:59:59.000Z

    Modern processors are using increasingly larger sized on-chip caches. Also, with each CMOS technology generation, there has been a significant increase in their leakage energy consumption. For this reason, cache power management has become a crucial research issue in modern processor design. To address this challenge and also meet the goals of sustainable computing, researchers have proposed several techniques for improving energy efficiency of cache architectures. This paper surveys recent architectural techniques for improving cache power efficiency and also presents a classification of these techniques based on their characteristics. For providing an application perspective, this paper also reviews several real-world processor chips that employ cache energy saving techniques. The aim of this survey is to enable engineers and researchers to get insights into the techniques for improving cache power efficiency and motivate them to invent novel solutions for enabling low-power operation of caches.

  16. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  17. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21T23:59:59.000Z

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

  18. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13T23:59:59.000Z

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  19. Potential use of electronic information for natural resource management by private landowners in Texas 

    E-Print Network [OSTI]

    Hays, Amy E

    2000-01-01T23:59:59.000Z

    A mail survey of Texas' private landowners was conducted in the fall of 1996 to assess the potential use of electronic information sources as a tool for natural resource management. Eight hundred private landowners in rural communities were asked...

  20. Potential use of electronic information for natural resource management by private landowners in Texas

    E-Print Network [OSTI]

    Hays, Amy E

    2000-01-01T23:59:59.000Z

    to respond to the survey. The outcome of this study is a recommendation to the Texas Agricultural Extension Service on additional methods of information dissemination for outreach and education as it relates to natural resource management. Respondents...

  1. Surveys on Mathematics for Industry 5 (1995) 2733 Improving manufacturing quality

    E-Print Network [OSTI]

    Pukelsheim, Friedrich

    that Quality Engineering is part of a more embracing concept, total quality management. Section 3 on PlannedSurveys on Mathematics for Industry 5 (1995) 27­33 Improving manufacturing quality through planned experimentation is a powerful tool to improve quality of industrial manufacturing processes, in an environment

  2. Task scheduling in an energy harvesting WSN for Structural Health Monitoring Literature Survey

    E-Print Network [OSTI]

    Simunic, Tajana

    Task scheduling in an energy harvesting WSN for Structural Health Monitoring Literature Survey Structural health monitoring (SHM) systems has proliferated in the last few decades [2] due to their ability inconsistent in its availability. A significant challenge in this type of system is the management

  3. A Survey of Data Provenance Techniques Yogesh L. Simmhan, Beth Plale, Dennis Gannon

    E-Print Network [OSTI]

    culminates with an identification of open research problems in the field. 1 Introduction The growing number Sky Survey (SDSS) [2] generate terabytes of data whose complexity is managed by data grids. This data for these data mining tasks to have metadata describing the data properties [3]. Provenance is one kind

  4. Forest Fuel Reduction Survey Analysis: Forest Administrators Cornelis F. de Hoop

    E-Print Network [OSTI]

    Wu, Qinglin

    Forest Fuel Reduction Survey Analysis: Forest Administrators by Cornelis F. de Hoop Amith Hanumappa to seriously investigate and execute the methods required to carry out a successful fuel reduction project operations wherein fuel reduction is a primary management objective. Literature on this wave of activity

  5. Designing and Mining Multi-Terabyte Astronomy Archives: The Sloan Digital Sky Survey

    E-Print Network [OSTI]

    Narasayya, Vivek

    will operate a data pump to support sweep searches touching most of the data. The anticipated queries will re management challenges. Keywords Database, archive, data analysis, data mining, astronomy, scaleable, InternetDesigning and Mining Multi-Terabyte Astronomy Archives: The Sloan Digital Sky Survey Alexander S

  6. Survey of LWR environmental control technology performance and cost

    SciTech Connect (OSTI)

    Heeb, C.M.; Aaberg, R.L.; Cole, B.M.; Engel, R.L.; Kennedy, W.E. Jr.; Lewallen, M.A.

    1980-03-01T23:59:59.000Z

    This study attempts to establish a ranking for species that are routinely released to the environment for a projected nuclear power growth scenario. Unlike comparisons made to existing standards, which are subject to frequent revision, the ranking of releases can be used to form a more logical basis for identifying the areas where further development of control technology could be required. This report describes projections of releases for several fuel cycle scenarios, identifies areas where alternative control technologies may be implemented, and discusses the available alternative control technologies. The release factors were used in a computer code system called ENFORM, which calculates the annual release of any species from any part of the LWR nuclear fuel cycle given a projection of installed nuclear generation capacity. This survey of fuel cycle releases was performed for three reprocessing scenarios (stowaway, reprocessing without recycle of Pu and reprocessing with full recycle of U and Pu) for a 100-year period beginning in 1977. The radioactivity releases were ranked on the basis of a relative ranking factor. The relative ranking factor is based on the 100-year summation of the 50-year population dose commitment from an annual release of radioactive effluents. The nonradioactive releases were ranked on the basis of dilution factor. The twenty highest ranking radioactive releases were identified and each of these was analyzed in terms of the basis for calculating the release and a description of the currently employed control method. Alternative control technology is then discussed, along with the available capital and operating cost figures for alternative control methods.

  7. Hazards Survey and Hazards Assessments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume is to assist DOE Operations/Field Offices and operating contractors in complying with the DOE O 151.1 requirement that Hazards Surveys and facility-specific Hazards Assessments be prepared, maintained, and used for emergency planning purposes. Canceled by DOE G 151.1-2.

  8. Considerations for PV Site Surveys

    E-Print Network [OSTI]

    Johnson, Eric E.

    array. #12;Conductor Routing & Inverter Location The location of the inverter in relation to the PV of the conductors between the PV array and the inverter, and between the inverter and the AC load centerConsiderations for PV Site Surveys John Wiles Sponsored by the U.S. Department of Energy this loss

  9. Life Choices Student Survey Items

    E-Print Network [OSTI]

    Baltisberger, Jay H.

    by Topical Area: Life Choices Berea-Specific Entering Survey, Fall Term First-Year Students and New Transfers for life-long learning Cooperative Institutional Research Program (CIRP), Entering Fall Term Students 2012, Historical Trends) Please indicate the extent to which each of the following describe you Searching

  10. Radiological Habits Survey, Chapelcross, 2005

    E-Print Network [OSTI]

    ;2 #12;3 SUMMARY 6 1. BACKGROUND 6 1.1 Regulation of radioactive waste discharges 6 1.2 The critical pipeline #12;4 TABLES Table 1. Typical food groups used in habits surveys Table 2. Adult consumption rates

  11. A Survey of Geometric Algebra

    E-Print Network [OSTI]

    Harrington, J. Patrick

    A Survey of Geometric Algebra and Geometric Calculus c Alan Macdonald Luther College, Decorah, IA is always available at my web page.) The principal argument for the adoption of geometric algebra and Geometric Algebra: http://faculty.luther.edu/~macdonal/laga/ Vector and Geometric Calculus: http

  12. JOURNAL AUTHORS SURVEY Prepared by

    E-Print Network [OSTI]

    Stevenson, Paul

    JISC/OSI JOURNAL AUTHORS SURVEY Report Prepared by Key Perspectives Ltd 48 Old Coach Road, Playing behind its development 4 2.2 Models and definitions of open access 8 2.2.1 Open access journals 8 2 4.1 Respondent profiles 18 4.2 Awareness of open access journals 18 4.2.1 Extent and longevity

  13. SURVEY 2013 June 6, 2014

    E-Print Network [OSTI]

    Rosen, Jay

    AND STRATEGY Ithaka S+R Faculty Survey: five triennial cycles of national needs tracking. Ithaka S+R Library. Is there a sustainable role for the library in support of discovery? 3. Should libraries move from collections libraries transition to e-only acquisitions for books? 2. Is there a sustainable role for the library

  14. SHSD Manager Safety Engineering Group Manager

    E-Print Network [OSTI]

    Safety, Machine Shop Safety, Tier I Program, Traffic Safety S. Moss: Nuclear Criticality Safety G. Shepherd: Explosives Safety, Facility Authorization Basis, Nuclear Safety R. Travis: Readiness Evaluations

  15. Environmental Survey preliminary report, Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming, Casper, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1989-02-01T23:59:59.000Z

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW) conducted June 6 through 17, 1988. NPOSR consists of the Naval Petroleum Reserve No. 3 (NPR-3) in Wyoming, the Naval Oil Shale Reserves No. 1 and 3 (NOSR-1 and NOSR-3) in Colorado and the Naval Oil Shale Reserve No. 2 (NOSR-2) in Utah. NOSR-2 was not included in the Survey because it had not been actively exploited at the time of the on-site Survey. The Survey is being conducted by an interdisciplinary team of environmental specialists, lead and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPOSR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at NPOSR and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified at NOSR-3 during the on-site Survey. There were no findings associated with either NPR-3 or NOSR-1 that required Survey-related sampling and Analysis. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the Environmental Survey Summary report. The Summary Report will reflect the final determinations of the NPOSR-CUW Survey and the other DOE site-specific Surveys. 110 refs., 38 figs., 24 tabs.

  16. Online Monitoring Technical Basis and Analysis Framework for Emergency

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM PolicyOfEnergy Online Classified or ControlledDiesel

  17. Online Monitoring Technical Basis and Analysis Framework for Large Power

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM PolicyOfEnergy Online Classified or

  18. Order Module--NNSA Orders Self-Study Program Safety Basis Documentatio...

    Broader source: Energy.gov (indexed) [DOE]

    NNSA Orders Self-Study Program Safety Basis Documentation Order Module--NNSA Orders Self-Study Program Safety Basis Documentation The familiar level of this module is divided into...

  19. A Note on the Finite Element Method with Singular Basis Functions

    E-Print Network [OSTI]

    Kaneko, Hideaki

    finite element analysis that incorporates singular element functions. A need for introducing * *some singular elements as part of basis functions in certain finite element analysis arises o* *ut A Note on the Finite Element Method with Singular Basis

  20. Technical basis for the aboveground structure failure and associated represented hazardous conditions

    SciTech Connect (OSTI)

    GOETZ, T.G.

    2003-07-25T23:59:59.000Z

    This technical basis document describes the risk binning process and the technical basis for assigning risk bins for the aboveground structure failure representative accident and associated represented hazardous conditions. This document was developed to support the documented safety analysis.

  1. Minutes of the Meeting of the Oak Processionary Moth Outbreak Management Team

    E-Print Network [OSTI]

    Minutes of the Meeting of the Oak Processionary Moth Outbreak Management Team 12.00, 25 February. Report on 2008 Surveys 5. MT gave the Team an update on his report on the survey for OPM in 2008. He is putting all involved in tackling OPM under huge pressure. SR advised the team that RBGK had received

  2. Risk Management, Mar 2012 Risk Management

    E-Print Network [OSTI]

    Risk Management, Mar 2012 Risk Management Conditions of Volunteer Service (Please send completed form to the Office of Risk Management) riskmanagement@uoregon.edu Fax: 541-346-7008 As a volunteer Tort Claims Act, ORS 30.260-300, and Oregon Department of Administrative Services Risk Management

  3. Risk Management Procedures Category: Strategic Management

    E-Print Network [OSTI]

    1 Risk Management Procedures Category: Strategic Management 1. LEGISLATION/ENTERPRISE AGREEMENT/POLICY SUPPORTED Risk Management Policy Tertiary Education Quality Standards Agency Act 2011 (TEQSA Act 2011) 2 (a) Advise the Vice-Chancellor on the effective management of the University's risk profile

  4. Landscape Management Systems The Visual Management System

    E-Print Network [OSTI]

    Standiford, Richard B.

    Landscape Management Systems The Visual Management System of the Forest Service, USDA1 Warren R presentation on how the Visual Management System (VMS) functions. 1/ Presented at the National Conference Manual 2380, Landscape Management, USDA. INTRODUCTION The American people are concerned about the quality

  5. Management 301 Management and Organizational Behavior

    E-Print Network [OSTI]

    Young, Paul Thomas

    Management 301 Management and Organizational Behavior Section 003 Fall 2013 (8/20-12/3) College approaches management as that process of reaching organizational goals by working with and through people. Course Objectives 1. To understand management and organizational behavior (ob) concepts associated

  6. Telluric Survey At Coso Geothermal Area (1977) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <Maintained ByManagement Inc Place:InformationTelluric Survey At

  7. Telluric Survey At Raft River Geothermal Area (1978) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <Maintained ByManagement Inc Place:InformationTelluric Survey

  8. Analysis of Assembly 264 - Amended: Pediatric Asthma Self-Management Training and Education Services for Children at High Risk

    E-Print Network [OSTI]

    California Health Benefits Review Program (CHBRP)

    2006-01-01T23:59:59.000Z

    management and education services was obtained from the 2001 CHIS Survey.management training and education services in Knox-Keene licensed plans in California was determined by a surveysurveys of providers of these services. These providers included for-profit disease management

  9. Undergraduate Curriculum tied for second, MBA Program tied for third In a 2011 supply chain management study by Gartner Supply

    E-Print Network [OSTI]

    Lin, Xiaodong

    management study by Gartner Supply Chain Leaders, a survey of how well leading universities are educating professionals to contend with a rapidly changing landscape, the Rutgers Business School Supply Chain Management Supply Chain Management programs in the country, Rutgers Business School showed its "perceived value

  10. Data Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOfficeOctoberDaniel WoodID Service FirstData

  11. Data Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOfficeOctoberDaniel WoodID Service

  12. Data Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOfficeOctoberDaniel WoodID ServiceData

  13. SUBCONTRACT MANAGEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy atLLC - FE DKT. 10-160-LNG - ORDERSTATE0-1 CHAPTER 10 SUBCONTRACT MANAGEMENT

  14. Management Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |IsLove Your Home and It'll LoveMail andAbout UsManagement

  15. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect (OSTI)

    Rathbone, Bruce A.

    2011-04-04T23:59:59.000Z

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Maintenance and distribution of controlled hard copies of the manual by PNNL was discontinued beginning with Revision 0.2.

  16. Experimental Progress Report--Modernizing the Fission Basis

    SciTech Connect (OSTI)

    Macri, R A

    2012-02-17T23:59:59.000Z

    In 2010 a proposal (Modernizing the Fission Basis) was prepared to 'resolve long standing differences between LANL and LLNL associated with the correct fission basis for analysis of nuclear test data'. Collaboration between LANL/LLNL/TUNL has been formed to implement this program by performing high precision measurements of neutron induced fission product yields as a function of incident neutron energy. This new program benefits from successful previous efforts utilizing mono-energetic neutrons undertaken by this collaboration. The first preliminary experiment in this new program was performed between July 24-31, 2011 at TUNL and had 2 main objectives: (1) demonstrating the capability to measure characteristic {gamma}-rays from specific fission products; (2) studying background effects from room scattered neutrons. In addition, a new dual fission ionization chamber has been designed and manufactured. The production design of the chamber is shown in the picture below. The first feasibility experiment to test this chamber is scheduled at the TUNL Tandem Laboratory from September 19-25, 2011. The dual fission chamber design will allow simultaneous exposure of absolute fission fragment emission rate detectors and the thick fission activation foils, positioned between the two chambers. This document formalizes the earlier experimental report demonstrating the experimental capability to make accurate (< 2 %) precision gamma-ray spectroscopic measurements of the excitation function of high fission product yields of the 239Pu(n,f) reaction (induced by quasimonoenergetic neutrons). A second experiment (9/2011) introduced an compact double-sided fission chamber into the experimental arrangement, and so the relative number of incident neutrons striking the sample foil at each bombarding energy is limited only by statistics. (The number of incident neutrons often limits the experimental accuracy.) Fission chamber operation was so exceptional that 2 more chambers have been fabricated; thus fission foils of different isotopes may be left in place with sample changes. The scope of the measurements is both greatly expanded and the results become vetted. Experiment 2 is not reported here. A continuing experiment has been proposed for February 2012.

  17. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect (OSTI)

    Rathbone, Bruce A.

    2010-04-01T23:59:59.000Z

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Maintenance and distribution of controlled hard copies of the manual by PNNL was discontinued beginning with Revision 0.2.

  18. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect (OSTI)

    Rathbone, Bruce A.

    2007-03-12T23:59:59.000Z

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at Hanford. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with 10 CFR 835, DOELAP, DOE-RL, ORP, PNSO, and Hanford contractor requirements. The dosimetry system is operated by PNNL’s Hanford External Dosimetry Program (HEDP) which provides dosimetry services to all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee (HPDAC) which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. Rev. 0 marks the first revision to be released through PNNL’s Electronic Records & Information Capture Architecture (ERICA) database. Revision numbers that are whole numbers reflect major revisions typically involving changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Revision Log: Rev. 0 (2/25/2005) Major revision and expansion. Rev. 0.1 (3/12/2007) Minor revision. Updated Chapters 5, 6 and 9 to reflect change in default ring calibration factor used in HEDP dose calculation software. Factor changed from 1.5 to 2.0 beginning January 1, 2007. Pages on which changes were made are as follows: 5.23, 5.69, 5.78, 5.80, 5.82, 6.3, 6.5, 6.29, 9.2.

  19. Solution to PDEs using radial basis function finite-differences (RBF-FD) on multiple GPUs

    SciTech Connect (OSTI)

    Bollig, Evan F., E-mail: bollig@scs.fsu.edu [Department of Scientific Computing, Florida State University, 400 Dirac Science Library, Tallahassee, FL 32306 (United States); Flyer, Natasha, E-mail: flyer@ucar.edu [Institute for Mathematics Applied to Geosciences, National Center for Atmospheric Research, 1850 Table Mesa Dr., Boulder, CO 80305 (United States)] [Institute for Mathematics Applied to Geosciences, National Center for Atmospheric Research, 1850 Table Mesa Dr., Boulder, CO 80305 (United States); Erlebacher, Gordon, E-mail: gerlebacher@fsu.edu [Department of Scientific Computing, Florida State University, 400 Dirac Science Library, Tallahassee, FL 32306 (United States)] [Department of Scientific Computing, Florida State University, 400 Dirac Science Library, Tallahassee, FL 32306 (United States)

    2012-08-30T23:59:59.000Z

    This paper presents parallelization strategies for the radial basis function-finite difference (RBF-FD) method. As a generalized finite differencing scheme, the RBF-FD method functions without the need for underlying meshes to structure nodes. It offers high-order accuracy approximation and scales as O(N) per time step, with N being with the total number of nodes. To our knowledge, this is the first implementation of the RBF-FD method to leverage GPU accelerators for the solution of PDEs. Additionally, this implementation is the first to span both multiple CPUs and multiple GPUs. OpenCL kernels target the GPUs and inter-processor communication and synchronization is managed by the Message Passing Interface (MPI). We verify our implementation of the RBF-FD method with two hyperbolic PDEs on the sphere, and demonstrate up to 9x speedup on a commodity GPU with unoptimized kernel implementations. On a high performance cluster, the method achieves up to 7x speedup for the maximum problem size of 27,556 nodes.

  20. Efficient basis for the Dicke Model I: theory and convergence in energy

    E-Print Network [OSTI]

    Miguel Angel Bastarrachea-Magnani; Jorge G. Hirsch

    2013-12-06T23:59:59.000Z

    An extended bosonic coherent basis has been shown by Chen to provide numerically exact solutions of the finite-size Dicke model. The advantages in employing this basis, as compared with the photon number (Fock) basis, are exhibited to be valid for a large region of the Hamiltonian parameter space by analyzing the converged values of the ground state energy.