Powered by Deep Web Technologies
Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Priority Permit Processing for Green Buildings  

Broader source: Energy.gov [DOE]

Hawaii Revised Statutes (HRS) §46-19.6 requires each county agency that issues building, construction, or development-related permits to establish a procedure for priority processing of permit...

2

Distributed PV Permitting and Inspection Processes  

Broader source: Energy.gov [DOE]

This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

3

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits...  

Broader source: Energy.gov (indexed) [DOE]

0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks...

4

Chapter 38 Hazardous Waste Permitting Process (Kentucky)  

Broader source: Energy.gov [DOE]

This administrative regulation establishes the general provisions for storage, treatment, recycling, or disposal of hazardous waste. It provides information about permits and specific requirements...

5

Geothermal policy development program: expediting the local geothermal permitting process  

SciTech Connect (OSTI)

For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

Not Available

1981-07-01T23:59:59.000Z

6

Model operating permits for natural gas processing plants  

SciTech Connect (OSTI)

Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

Arend, C. [Hydro-Search, Inc., Houston, TX (United States)

1995-12-31T23:59:59.000Z

7

Expedited Permitting Process for Solar Photovoltaic Systems (Vermont)  

Broader source: Energy.gov [DOE]

Vermont has established an expedited permitting process for solar photovoltaic systems that are 10 kilowatts-AC (kW) or less. In order to interconnect and net meter, electric customers in Vermont...

8

Permits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven AshbyDepartment ofGE'sOptimizationUSING CRonOther Permits

9

Property:AirQualityPermitProcess | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyo County, California | Open Energy InformationAirQualityPermitProcess Jump to:

10

K Basin sludge treatment process description  

SciTech Connect (OSTI)

The K East (KE) and K West (KW) fuel storage basins at the 100 K Area of the Hanford Site contain sludge on the floor, in pits, and inside fuel storage canisters. The major sources of the sludge are corrosion of the fuel elements and steel structures in the basin, sand intrusion from outside the buildings, and degradation of the structural concrete that forms the basins. The decision has been made to dispose of this sludge separate from the fuel elements stored in the basins. The sludge will be treated so that it meets Tank Waste Remediation System (TWRS) acceptance criteria and can be sent to one of the double-shell waste tanks. The US Department of Energy, Richland Operations Office accepted a recommendation by Fluor Daniel Hanford, Inc., to chemically treat the sludge. Sludge treatment will be done by dissolving the fuel constituents in nitric acid, separating the insoluble material, adding neutron absorbers for criticality safety, and reacting the solution with caustic to co-precipitate the uranium and plutonium. A truck will transport the resulting slurry to an underground storage tank (most likely tank 241-AW-105). The undissolved solids will be treated to reduce the transuranic (TRU) and content, stabilized in grout, and transferred to the Environmental Restoration Disposal Facility (ERDF) for disposal. This document describes a process for dissolving the sludge to produce waste streams that meet the TWRS acceptance criteria for disposal to an underground waste tank and the ERDF acceptance criteria for disposal of solid waste. The process described is based on a series of engineering studies and laboratory tests outlined in the testing strategy document (Flament 1998).

Westra, A.G.

1998-08-28T23:59:59.000Z

11

City of Anaheim This page outlines solar PV incentives, financing mechanisms, permitting process, and  

E-Print Network [OSTI]

a contract. Back to Top Financing Information Federal Solar Incentives o Residential Renewable Energy TaxCity of Anaheim This page outlines solar PV incentives, financing mechanisms, permitting process | Incentives | Permitting | Interconnection Contact Information City of Anaheim Building Division 200 S

12

Summary - K Basins Sludge Treatment Process  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational EnergyCommittee onGASRainey STAR Center | ETR-19 UnitedK Basin

13

A New Concept: Use of Negotiations in the Hazardous Waste Facility Permitting Process in New Mexico  

SciTech Connect (OSTI)

This paper describes a unique negotiation process leading to authorization of the U.S. Department of Energy (DOE) to manage and dispose remote-handled (RH) transuranic (TRU) mixed wastes at the Waste Isolation Pilot Plant (WIPP). The negotiation process involved multiple entities and individuals brought together under authority of the New Mexico Environment Department (NMED) to discuss and resolve technical and facility operational issues flowing from an NMED-issued hazardous waste facility Draft Permit. The novel negotiation process resulted in numerous substantive changes to the Draft Permit, which were ultimately memorialised in a 'Draft Permit as Changed'. This paper discusses various aspects of the negotiation process, including events leading to the negotiations, regulatory basis for the negotiations, negotiation participants, and benefits of the process. (authors)

Johnson, G.J. [Washington TRU Solutions, LLC, Waste Isolation Pilot Plant, New Mexico (United States); Rose, W.M. [U.S. Department of Energy, Carlsbad Field Office, Waste Isolation Pilot Plant, New Mexico (United States); Domenici, P.V.; Hollingsworth, L. [Domenici Law Firm PC, Albuquerque, New Mexico (United States)

2007-07-01T23:59:59.000Z

14

A study of decision making in the power plant permitting process in Appalachia. Final report  

SciTech Connect (OSTI)

Results of prior work and prevalent opinion in both private and public sectors suggested that an improved permitting process that assures better communications among decision-making bodies, utility companies and regulating agencies, and which removes inefficiencies could shorten this time lag. Four recently-permitted Appalachian power stations were selected for detailed analysis: Pleasants Power Station, Pleasants County, West Virginia; Miller Steam Plant, Jefferson County, Alabama; Cherokee Power Station, Cherokee County, South Carolina; Homer City Power Station, Indiana County, Pennsylvania.

Not Available

1981-03-01T23:59:59.000Z

15

INTEC CPP-603 Basin Water Treatment System Closure: Process Design  

SciTech Connect (OSTI)

This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.

Kimmitt, Raymond Rodney; Faultersack, Wendell Gale; Foster, Jonathan Kay; Berry, Stephen Michael

2002-09-01T23:59:59.000Z

16

Data Quality Objectives Process for Designation of K Basins Debris  

SciTech Connect (OSTI)

The U.S. Department of Energy has developed a schedule and approach for the removal of spent fuels, sludge, and debris from the K East (KE) and K West (KW) Basins, located in the 100 Area at the Hanford Site. The project that is the subject of this data quality objective (DQO) process is focused on the removal of debris from the K Basins and onsite disposal of the debris at the Environmental Restoration Disposal Facility (ERDF). This material previously has been dispositioned at the Hanford Low-Level Burial Grounds (LLBGs) or Central Waste Complex (CWC). The goal of this DQO process and the resulting Sampling and Analysis Plan (SAP) is to provide the strategy for characterizing and designating the K-Basin debris to determine if it meets the Environmental Restoration Disposal Facility Waste Acceptance Criteria (WAC), Revision 3 (BHI 1998). A critical part of the DQO process is to agree on regulatory and WAC interpretation, to support preparation of the DQO workbook and SAP.

WESTCOTT, J.L.

2000-05-22T23:59:59.000Z

17

K Basins Sludge Treatment Process | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiatives Initiatives Through aEnergyLowJoelProcess K Basins Sludge

18

Integrated Water Treatment System (IWTS) Process Flow Diagram Mass Balance Calculations for K West Basin  

SciTech Connect (OSTI)

The purpose of this calculation is to develop the rational for the material balances that are documented in the KW Basin water system Level 1 process flow diagrams.

REED, A.V.

2000-02-28T23:59:59.000Z

19

Water Use Permitting (Wisconsin)  

Broader source: Energy.gov [DOE]

Withdrawers in the Great Lakes Basin who withdraw water in quantities that average 100,000 gallons per day or more in any 30-day period are required to get a water use permit. Two types of water...

20

Recent glacially influenced sedimentary processes on the East Greenland continental slope and deep Greenland Basin  

E-Print Network [OSTI]

Recent glacially influenced sedimentary processes on the East Greenland continental slope and deep Greenland Basin Marga García a,*, Julian A. Dowdeswell a , Gemma Ercilla b , Martin Jakobsson c a Scott June 2012 Available online xxx Keywords: Greenland Basin Glacially influenced sedimentary processes

Jakobsson, Martin

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

The dynamics and physical processes of the Comoros Basin.  

E-Print Network [OSTI]

??Includes abstract. The main objective of this thesis was to investigate the circulation in the ComorosBasin using observed and model datasets. These data were used… (more)

Collins, Charine

2013-01-01T23:59:59.000Z

22

City of Los Angeles This page outlines solar PV incentives, financing mechanisms, permitting process, and  

E-Print Network [OSTI]

Incentives o Residential Renewable Energy Tax Credit · A taxpayer may claim a credit of 30% of qualifiedCity of Los Angeles This page outlines solar PV incentives, financing mechanisms, permitting these hyperlinks: Find an Installer | Financing | Incentives | Permitting | Interconnection Contact Information

23

Earth-Ocean Interac-ons Basin-Scale Impacts & Processes  

E-Print Network [OSTI]

Earth-Ocean Interac-ons Basin-Scale Impacts & Processes Joseph Resing (JISAO ocean. Volcanic erup6ons, glacial flour. Submarine Hydrothermal and Volcanic -Hydrothermal ac-vity and trace nutrient Fe -Hydrothermal ac-vity and trace nutrient

24

Sheetflow fluvial processes in a rapidly subsiding basin, Altiplano plateau, Bolivia  

E-Print Network [OSTI]

Sheetflow fluvial processes in a rapidly subsiding basin, Altiplano plateau, Bolivia BRIAN A continuously for >100 km along the eastern limb of the Corque syncline in the high Altiplano plateau of Bolivia

Horton, Brian K.

25

Industrial Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Protection Obeying Environmental Laws Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the...

26

Coastal Permit Program Rules (New Jersey)  

Broader source: Energy.gov [DOE]

The Coastal Permit Program Rules provide the processes for permit reviews. They include details on what activities need permits; the qualifications for general permits or permits-by-rule; the...

27

EFFICACY OF FILTRATION PROCESSES TO OBTAIN WATER CLARITY AT K EAST SPENT NUCLEAR FUEL (SNF) BASIN  

SciTech Connect (OSTI)

The objective is to provide water clarity to the K East Basin via filtration processes. Several activities are planned that will challenge not only the capacity of the existing ion exchange modules to perform as needed but also the current filtration system to maintain water clarity. Among the planned activities are containerization of sludge, removal of debris, and hydrolasing the basin walls to remove contamination.

DUNCAN JB

2006-09-28T23:59:59.000Z

28

Groundwater availability and flow processes in the Williston and Powder River basins in the Northern Great Plains  

E-Print Network [OSTI]

Groundwater availability and flow processes in the Williston and Powder River basins, OK The recent oil and gas development in the Williston structural basin (containing the Bakken will be used to develop inputs to a numerical model of groundwater flow in the Williston structural basin

Torgersen, Christian

29

File:06TXAExtraLegalVehiclePermittingProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf

30

Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices  

SciTech Connect (OSTI)

Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) thelack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

Not Available

1980-11-01T23:59:59.000Z

31

Louisiana Title V General Permits  

SciTech Connect (OSTI)

Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

Boyer, B.E.; Neal, T.L.

1995-12-31T23:59:59.000Z

32

Modeling basin- and plume-scale processes of CO2 storage for full-scale deployment  

SciTech Connect (OSTI)

Integrated modeling of basin- and plume-scale processes induced by full-scale deployment of CO{sub 2} storage was applied to the Mt. Simon Aquifer in the Illinois Basin. A three-dimensional mesh was generated with local refinement around 20 injection sites, with approximately 30 km spacing. A total annual injection rate of 100 Mt CO{sub 2} over 50 years was used. The CO{sub 2}-brine flow at the plume scale and the single-phase flow at the basin scale were simulated. Simulation results show the overall shape of a CO{sub 2} plume consisting of a typical gravity-override subplume in the bottom injection zone of high injectivity and a pyramid-shaped subplume in the overlying multilayered Mt. Simon, indicating the important role of a secondary seal with relatively low-permeability and high-entry capillary pressure. The secondary-seal effect is manifested by retarded upward CO{sub 2} migration as a result of multiple secondary seals, coupled with lateral preferential CO{sub 2} viscous fingering through high-permeability layers. The plume width varies from 9.0 to 13.5 km at 200 years, indicating the slow CO{sub 2} migration and no plume interference between storage sites. On the basin scale, pressure perturbations propagate quickly away from injection centers, interfere after less than 1 year, and eventually reach basin margins. The simulated pressure buildup of 35 bar in the injection area is not expected to affect caprock geomechanical integrity. Moderate pressure buildup is observed in Mt. Simon in northern Illinois. However, its impact on groundwater resources is less than the hydraulic drawdown induced by long-term extensive pumping from overlying freshwater aquifers.

Zhou, Q.; Birkholzer, J.T.; Mehnert, E.; Lin, Y.-F.; Zhang, K.

2009-08-15T23:59:59.000Z

33

AGU Chapman Conference Hydrogeologic Processes: Building and Testing Atomistic- to Basin-Scale Models  

SciTech Connect (OSTI)

This report presents details of the Chapman Conference given on June 6--9, 1994 in Lincoln, New Hampshire. This conference covered the scale of processes involved in coupled hydrogeologic mass transport and a concept of modeling and testing from the atomistic- to the basin- scale. Other topics include; the testing of fundamental atomic level parameterizations in the laboratory and field studies of fluid flow and mass transport and the next generation of hydrogeologic models. Individual papers from this conference are processed separately for the database.

Weaver, B. [American Geophysical Union, Washington, DC (United States)

1994-12-31T23:59:59.000Z

34

Transportability Class of Americium in K Basin Sludge under Ambient and Hydrothermal Processing Conditions  

SciTech Connect (OSTI)

This report establishes the technical bases for using a ''slow uptake'' instead of a ''moderate uptake'' transportability class for americium-241 (241Am) for the K Basin Sludge Treatment Project (STP) dose consequence analysis. Slow uptake classes are used for most uranium and plutonium oxides. A moderate uptake class has been used in prior STP analyses for 241Am based on the properties of separated 241Am and its associated oxide. However, when 241Am exists as an ingrown progeny (and as a small mass fraction) within plutonium mixtures, it is appropriate to assign transportability factors of the predominant plutonium mixtures (typically slow) to the Am241. It is argued that the transportability factor for 241Am in sludge likewise should be slow because it exists as a small mass fraction as the ingrown progeny within the uranium oxide in sludge. In this report, the transportability class assignment for 241Am is underpinned with radiochemical characterization data on K Basin sludge and with studies conducted with other irradiated fuel exposed to elevated temperatures and conditions similar to the STP. Key findings and conclusions from evaluation of the characterization data and published literature are summarized here. Plutonium and 241Am make up very small fractions of the uranium within the K Basin sludge matrix. Plutonium is present at about 1 atom per 500 atoms of uranium and 241Am at about 1 atom per 19000 of uranium. Plutonium and americium are found to remain with uranium in the solid phase in all of the {approx}60 samples taken and analyzed from various sources of K Basin sludge. The uranium-specific concentrations of plutonium and americium also remain approximately constant over a uranium concentration range (in the dry sludge solids) from 0.2 to 94 wt%, a factor of {approx}460. This invariability demonstrates that 241Am does not partition from the uranium or plutonium fraction for any characterized sludge matrix. Most of the K Basin sludge characterization data is derived spent nuclear fuel corroded within the K Basins at 10-15?C. The STP process will place water-laden sludges from the K Basin in process vessels at {approx}150-180 C. Therefore, published studies with other irradiated (uranium oxide) fuel were examined. From these studies, the affinity of plutonium and americium for uranium in irradiated UO2 also was demonstrated at hydrothermal conditions (150 C anoxic liquid water) approaching those proposed for the STP process and even for hydrothermal conditions outside of the STP operating envelope (e.g., 150 C oxic and 100 C oxic and anoxic liquid water). In summary, by demonstrating that the chemical and physical behavior of 241Am in the sludge matrix is similar to that of the predominant species (uranium and for the plutonium from which it originates), a technical basis is provided for using the slow uptake transportability factor for 241Am that is currently used for plutonium and uranium oxides. The change from moderate to slow uptake for 241Am could reduce the overall analyzed dose consequences for the STP by more than 30%.

Delegard, Calvin H.; Schmitt, Bruce E.; Schmidt, Andrew J.

2006-08-01T23:59:59.000Z

35

Water Pollution Control Permit Regulations (Vermont)  

Broader source: Energy.gov [DOE]

These regulations outline the permits and permitting processes for point discharges to surface waters and outline the monitoring and reporting requirements.

36

Operating Permits and Emission Fees (New Mexico)  

Broader source: Energy.gov [DOE]

The New Mexico Environment Department's Air Quality Bureau processes permit applications for industries that emit pollutants to the air. The Permitting Section consists of three units, the Minor...

37

RESERVES IN WESTERN BASINS PART IV: WIND RIVER BASIN  

SciTech Connect (OSTI)

Vast quantities of natural gas are entrapped within various tight formations in the Rocky Mountain area. This report seeks to quantify what proportion of that resource can be considered recoverable under today's technological and economic conditions and discusses factors controlling recovery. The ultimate goal of this project is to encourage development of tight gas reserves by industry through reducing the technical and economic risks of locating, drilling and completing commercial tight gas wells. This report is the fourth in a series and focuses on the Wind River Basin located in west central Wyoming. The first three reports presented analyses of the tight gas reserves and resources in the Greater Green River Basin (Scotia, 1993), Piceance Basin (Scotia, 1995) and the Uinta Basin (Scotia, 1995). Since each report is a stand-alone document, duplication of language will exist where common aspects are discussed. This study, and the previous three, describe basin-centered gas deposits (Masters, 1979) which contain vast quantities of natural gas entrapped in low permeability (tight), overpressured sandstones occupying a central basin location. Such deposits are generally continuous and are not conventionally trapped by a structural or stratigraphic seal. Rather, the tight character of the reservoirs prevents rapid migration of the gas, and where rates of gas generation exceed rates of escape, an overpressured basin-centered gas deposit results (Spencer, 1987). Since the temperature is a primary controlling factor for the onset and rate of gas generation, these deposits exist in the deeper, central parts of a basin where temperatures generally exceed 200 F and drill depths exceed 8,000 feet. The abbreviation OPT (overpressured tight) is used when referring to sandstone reservoirs that comprise the basin-centered gas deposit. Because the gas resources trapped in this setting are so large, they represent an important source of future gas supply, prompting studies to understand and quantify the resource itself and to develop technologies that will permit commercial exploitation. This study is a contribution to that process.

Robert Caldwell

1998-04-01T23:59:59.000Z

38

Storm Water Discharge Permits (Wisconsin)  

Broader source: Energy.gov [DOE]

Wisconsin's storm water runoff regulations include permitting requirements for construction sites and industrial facilities, including those processing or extracting coal or gas. The purpose of the...

39

The production of a premium solid fuel from Powder River Basin coal. [COMPCOAL Process  

SciTech Connect (OSTI)

This report describes our initial evaluation of a process designed to produce premium-quality solid fuel from Powder River Basin (PRB) coal. The process is based upon our experience gained by producing highly-reactive, high-heating-value char as part of a mild-gasification project. In the process, char containing 20 to 25 wt % volatiles and having a gross heating value of 12,500 to 13,000 Btu/lb is produced. The char is then contacted by coal-derived liquid. The result is a deposit of 6 to 8 wt % pitch on the char particles. The lower boiling component of the coal-derived liquid which is not deposited on the char is burned as fuel. Our economic evaluation shows the process will be economically attractive if the product can be sold for about $20/ton or more. Our preliminary tests show that we can deposit pitch on to the char, and the product is less dusty, less susceptible to readsorption of moisture, and has reduced susceptibility to self heating.

Merriam, N.; Sethi, V.; Thomas, K.; Grimes, R.W.

1992-01-01T23:59:59.000Z

40

Water Permits (Louisiana)  

Broader source: Energy.gov [DOE]

The Water Permits Division authorizes permits administered under the Water Quality Regulations. Louisiana's Water Quality Regulations require permits for the discharge of pollutants from any point...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

AN INVESTIGATION OF DEWATERING FOR THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO  

E-Print Network [OSTI]

c:es .B~l:JJ:. }eti. ',~, Colorado School of Mines, VoL 2'1,v Piceance Creek Basin v Colorado r and 9 p' 1974. Pc:u:~·tBetween 'che White and Colorado Rivers, '! \\lo:ci:hwegt:ern

Mehran, M.

2013-01-01T23:59:59.000Z

42

Depositional and dissolutional processes and their resulting thinning patterns within the Middle Devonian Prairie Formation, Williston basin, North Dakota and Montana  

SciTech Connect (OSTI)

Within the Williston basin, thickness variations of the Prairie Formation are common and are interpreted to originate by two processes: differential accumulation of salt during deposition and differential removal of salt by dissolution. Unambiguous evidence for each process is rare because the Prairie/Winnipegosis interval is seldom cored within the US portion of the basin. Therefore, indirect methods, using well logs, provide the principal method for identifying characteristics of the two processes. The results of this study indicate that the two processes can be distinguished using correlations within the Prairie Formation. Several regionally correlative brining-upward and probably shoaling-upward sequences occur within the Prairie Formation. Near the basin center, the lowermost sequence is transitional with the underlying Winnipegosis Formation. This transition is characterized by thinly laminated basal carbonates that become increasingly interbedded with anhydrites of the basin-centered Ratner member. The remainder of the sequence progresses up through halite and culminates in the halite-dominated Esterhazy potash beds. Two overlying sequences also brine upward; however, these sequences lack the basal anhydrite and instead begin with halite and culminate in the Belle Plaine and Mountrail potash members, respectively. A fourth sequence is indicated by several feet of halite capping the Mountrail member in some parts of the basin. Subsequent erosion or dissolution prior to burial may have removed the upper portion of this sequence. Cross sections show that the lower Prairie gradually decreases in thickness from the basin to its margins. This thickens variation is most simply explained by decreasing accommodation potential due to decreased basin topography away from the basin depocenter and by depositional onlap of the Prairie toward the basin margins.

Oglesby, C.A.

1988-07-01T23:59:59.000Z

43

The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities  

E-Print Network [OSTI]

OPR). 2012. California Solar Permitting Guidebook.plus data from the California Solar Initiative and the U.S.The Sierra Club’s California Solar Permit Fee Campaign

Wiser, Ryan

2014-01-01T23:59:59.000Z

44

Microsoft Word - Environmental Permits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Permits July 16, 2012 Department of Energy PermitsAgreements Issuing Agency Kentucky Pollutant Discharge Elimination System Kentucky Division of Water Solid Waste -...

45

Origin of cratonic basins  

SciTech Connect (OSTI)

Tectonic subsidence curves show that the Illinois, Michigan, and Williston basins formed by initial fault-controlled mechanical subsidence during rifting and by subsequent thermal subsidence. Thermal subsidence began around 525 Ma in the Illinois Basin, 520-460 Ma in the Michigan Basin, and 530-500 Ma in the Williston Basin. In the Illinois Basin, a second subsidence episode (middle Mississippian through Early Permian) was caused by flexural foreland subsidence in response to the Alleghanian-Hercynian orogeny. Past workers have suggested mantle phase changes at the base of the crust, mechanical subsidence in response to isostatically uncompensated excess mass following igneous intrusions, intrusion of mantle plumes into the crust, or regional thermal metamorphic events as causes of basin initiation. Cratonic basins of North America, Europe, Africa, and South America share common ages of formation, histories of sediment accumulation, temporal volume changes of sediment fills, and common dates of interregional unconformities. Their common date of formation suggests initiation of cratonic basins in response to breakup of a late Precambrian supercontinent. This supercontinent acted as a heat lens that caused partial melting of the lower crust and upper mantle followed by emplacement of anorogenic granites during extensional tectonics in response to supercontinent breakup. Intrusion of anorogenic granites and other partially melted intrusive rocks weakened continental lithosphere, thus providing a zone of localized regional stretching and permitting formation of cratonic basins almost simultaneously over sites of intrusion of these anorogenic granites and other partially melted intrusive rocks.

de V. Klein, G.; Hsui, A.T.

1987-12-01T23:59:59.000Z

46

Presidential Permits | Department of Energy  

Energy Savers [EERE]

Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits - Canada...

47

Industrial Discharge Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

All businesses and government agencies discharging process wastewater to the public sewer system must report their activities to DC Water's Pretreatment Center. Wastewater discharge permits are...

48

Solar Permitting Law (Oregon)  

Broader source: Energy.gov [DOE]

With the passage of HB 3516 in June 2011, solar permit application approval is a "ministerial function", provided a system meets certain guidelines. To qualify for this simplified permitting...

49

Solar Construction Permitting Standards  

Broader source: Energy.gov [DOE]

Owners of solar photovoltaic (PV) systems and solar water heating systems in Arizona are required to obtain a building permit before their systems may be installed. Permits are handled at the...

50

DISCOUNTED EVENT PERMIT REQUEST  

E-Print Network [OSTI]

DISCOUNTED EVENT PERMIT REQUEST Discounted daily parking rates are available for CSM events where or the daily scratch off permits: COMMUTER LOTS: $3.00 / day GENERAL LOTS: $4.00 / day Please e-mail or drop

51

Solar Construction Permitting Standards  

Broader source: Energy.gov [DOE]

Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the...

52

The role of syn-kinematic sedimentation on early salt tectonic processes in the Post-Permian Salt Basin, Southern North Sea  

E-Print Network [OSTI]

The role of syn-kinematic sedimentation on early salt tectonic processes in the Post-Permian Salt- Permian salt basin of the southernmost North Sea using 3D seismic interpretation, structural modelling mechanical concepts for the dynamics of salt structures and related depositional systems as well

Royal Holloway, University of London

53

Renewable Energy Permitting Barriers in Hawaii: Experience from the Field  

SciTech Connect (OSTI)

This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

2013-03-01T23:59:59.000Z

54

Hazardous Waste Transporter Permits (Connecticut)  

Broader source: Energy.gov [DOE]

Transportation of hazardous wastes into or through the State of Connecticut requires a permit. Some exceptions apply. The regulations provide information about obtaining permits and other permit...

55

COMPCOAL{trademark}: A profitable process for production of a stable high-Btu fuel from Powder River Basin coal  

SciTech Connect (OSTI)

Western Research Institute (WRI) is developing a process to produce a stable, clean-burning, premium fuel from Powder River Basin (PRB) coal and other low-rank coals. This process is designed to overcome the problems of spontaneous combustion, dust formation, and readsorption of moisture that are experienced with PRB coal and with processed PRB coal. This process, called COMPCOAL{trademark}, results in high-Btu product that is intended for burning in boilers designed for midwestern coals or for blending with other coals. In the COMPCOAL process, sized coal is dried to zero moisture content and additional oxygen is removed from the coal by partial decarboxylation as the coal is contacted by a stream of hot fluidizing gas in the dryer. The hot, dried coal particles flow into the pyrolyzer where they are contacted by a very small flow of air. The oxygen in the air reacts with active sites on the surface of the coal particles causing the temperature of the coal to be raised to about 700{degrees}F (371{degrees}C) and oxidizing the most reactive sites on the particles. This ``instant aging`` contributes to the stability of the product while only reducing the heating value of the product by about 50 Btu/lb. Less than 1 scf of air per pound of dried coal is used to avoid removing any of the condensible liquid or vapors from the coal particles. The pyrolyzed coal particles are mixed with fines from the dryer cyclone and dust filter and the resulting mixture at about 600{degrees}F (316{degrees}C) is fed into a briquettor. Briquettes are cooled to about 250{degrees}F (121{degrees}C) by contact with a mist of water in a gas-tight mixing conveyor. The cooled briquettes are transferred to a storage bin where they are accumulated for shipment.

Smith, V.E.; Merriam, N.W.

1994-10-01T23:59:59.000Z

56

Stormwater Permits (Vermont)  

Broader source: Energy.gov [DOE]

Stormwater permits are required for the construction of a new generation facility, the reconstruction or expansion of a facility, the operation of a generation facility which discharges stormwater...

57

CCS Project Permit Acquisition Protocols  

SciTech Connect (OSTI)

Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

2013-06-30T23:59:59.000Z

58

City of Portland- Streamlined Building Permits for Residential Solar Systems  

Broader source: Energy.gov [DOE]

The City of Portland's Bureau of Development Services (BDS) developed an electronic permitting process for residential solar energy system installations. With this streamlined, expedited process,...

59

Geochemical tracers of processes affecting the formation of seafloor hydrothermal fluids and deposits in the Manus back-arc basin  

E-Print Network [OSTI]

Systematic differences in trace element compositions (rare earth element (REE), heavy metal, metalloid concentrations) of seafloor vent fluids and related deposits from hydrothermal systems in the Manus back-arc basin ...

Craddock, Paul R

2009-01-01T23:59:59.000Z

60

Environmental Permit Application Background Statement (Delaware)  

Broader source: Energy.gov [DOE]

The purpose of Chapter 79 of Delaware Title 7 is to ensure that the State has adequate information about the background of applicants or regulated parties for the purposes of processing permits and...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Remaining Sites Verification Package for the 100-D-50:5 Process Sewers (183-DR Sedimentation Basin Drains), Waste Site Reclassification Form 2006-025  

SciTech Connect (OSTI)

The 100-D-50:5 subsite encompasses the southern process sewers formerly servicing the 183-DR coagulation and sedimentation basins and proximate surface runoff collection drains. The results of confirmatory sampling of pipeline sediments and underlying soils at the 100-D-50:5 subsite demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2007-11-06T23:59:59.000Z

62

Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program  

SciTech Connect (OSTI)

Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

Goldstein, D.R.; Cressman, A.W.

1999-07-01T23:59:59.000Z

63

General Air Permits (Louisiana)  

Broader source: Energy.gov [DOE]

Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any...

64

Storm Water Individual Permit.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

information meeting to discuss the biannual update on the NPDES Storm Water Individual Permit. Wednesday, January 22, 2014 5:30 p.m. Cities of Gold Conference Center 10 Cities of...

65

Operating Permits (New Jersey)  

Broader source: Energy.gov [DOE]

The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure...

66

Wind Energy Permitting Standards  

Broader source: Energy.gov [DOE]

All wind facilities larger than 0.5 megawatts (MW) that begin construction after July 1, 2010, must obtain a permit from any county in which the facility is located. Facilities must also obtain...

67

Direct Discharge Permit (Vermont)  

Broader source: Energy.gov [DOE]

A direct discharge permit is required if a project involves the discharge of pollutants to state waters. For generation purposes, this involves the withdrawal of surface water for cooling purposes...

68

Hanford Facility RCRA permit handbook  

SciTech Connect (OSTI)

Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

NONE

1996-03-01T23:59:59.000Z

69

Bridging river basin scales and processes to assess human-climate impacts and the terrestrial hydrologic system  

E-Print Network [OSTI]

scales impacts of storm water from urban/suburban development on water quantity and quality have been and implementation of integrated instrumentation, a new generation of models, and a management framework that clearly of our water resources at the river basin scale. This paper concludes with a discussion of how a network

Wagener, Thorsten

70

TECHNOLOGY DEVELOPMENT AND DEPLOYMENT OF SYSTEMS FOR THE RETRIEVAL AND PROCESSING OF REMOTE-HANDLED SLUDGE FROM HANFORD K-WEST FUEL STORAGE BASIN  

SciTech Connect (OSTI)

In 2011, significant progress was made in developing and deploying technologies to remove, transport, and interim store remote-handled sludge from the 105-K West Fuel Storage Basin on the Hanford Site in south-central Washington State. The sludge in the 105-K West Basin is an accumulation of degraded spent nuclear fuel and other debris that collected during long-term underwater storage of the spent fuel. In 2010, an innovative, remotely operated retrieval system was used to successfully retrieve over 99.7% of the radioactive sludge from 10 submerged temporary storage containers in the K West Basin. In 2011, a full-scale prototype facility was completed for use in technology development, design qualification testing, and operator training on systems used to retrieve, transport, and store highly radioactive K Basin sludge. In this facility, three separate systems for characterizing, retrieving, pretreating, and processing remote-handled sludge were developed. Two of these systems were successfully deployed in 2011. One of these systems was used to pretreat knockout pot sludge as part of the 105-K West Basin cleanup. Knockout pot sludge contains pieces of degraded uranium fuel ranging in size from 600 {mu}m to 6350 {mu}m mixed with pieces of inert material, such as aluminum wire and graphite, in the same size range. The 2011 pretreatment campaign successfully removed most of the inert material from the sludge stream and significantly reduced the remaining volume of knockout pot product material. Removing the inert material significantly minimized the waste stream and reduced costs by reducing the number of transportation and storage containers. Removing the inert material also improved worker safety by reducing the number of remote-handled shipments. Also in 2011, technology development and final design were completed on the system to remove knockout pot material from the basin and transport the material to an onsite facility for interim storage. This system is scheduled for deployment in 2012. The prototype facility also was used to develop technology for systems to retrieve remote-handled transuranic sludge smaller than 6350 {mu}m being stored in underwater containers. After retrieving the sludge, the system will be used to load and transport the sludge for interim storage. During 2011, full-scale prototype systems were developed and tested to a Technology Readiness Level 6 as defined by U.S. Department of Energy standards. This system is scheduled for deployment in 2013. Operations also are scheduled for completion in 2014.

RAYMOND RE

2011-12-27T23:59:59.000Z

71

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

72

Montana Water Quality Permit Application, Nondegradation Authorization...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Water Quality Permit Application, Nondegradation Authorization, and Permit FeesPermitting...

73

Permit application modifications  

SciTech Connect (OSTI)

This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

NONE

1995-11-01T23:59:59.000Z

74

"Mobile money" services permit  

E-Print Network [OSTI]

"Mobile money" services permit cell phone users to send small amounts of money via text message to their friends and relatives. There are over 90 mobile money services in the world today, mainly in emergingTure oF Money october 2012 - April 2013 Muriel Ansley reynolds exhibit GAllery For the full exhibit checklist

Loudon, Catherine

75

General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe permit and facility requirements for facilities which discharge wastewater. Facility construction, expansion, alteration, production increases, or process modifications...

76

Western oil-shale development: a technology assessment. Volume 5: an investigation of dewatering for the modified in-situ retorting process, Piceance Creek Basin, Colorado  

SciTech Connect (OSTI)

The C-a and the C-b tracts in the Piceance Creek Basin are potential sites for the development of oil shale by the modified in-situ retorting (MIS) process. Proposed development plans for these tracts require the disturbance of over three billion m/sup 3/ of oil shale to a depth of about 400 m (1312 ft) or more below ground level. The study investigates the nature and impacts of dewatering and reinvasion that are likely to accompany the MIS process. The purpose is to extend earlier investigations through more refined mathematical analysis. Physical phenomena not adequately covered in previous studies, particularly the desaturation process, are investigated. The present study also seeks to identify, through a parametric approach, the key variables that are required to characterize systems such as those at the C-a and C-b tracts.

Not Available

1982-01-01T23:59:59.000Z

77

Portland's Residential Solar Permitting Guide  

Broader source: Energy.gov [DOE]

This program guide outlines the application and review procedures for obtaining the necessary permit(s) to install a solar energy system for a new or existing residential building. The guide also...

78

Regulatory and Permitting Issues  

SciTech Connect (OSTI)

As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

Larry Myer

2005-12-01T23:59:59.000Z

79

Presidential Permits - Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with...

80

Broward County Online Solar Permitting (Florida)  

Broader source: Energy.gov [DOE]

Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Manor Farm Permit Fees from 1 March 2014 Staff permits  

E-Print Network [OSTI]

-Site: low * £18.42 per month Car Share Permit * £82.00 per annum 2 or more University motorists sharing: Permit Type £ Notes Essential Use £201.00 per annum Car Share £80.00 per annum 2 or more University motorists sharing SOUPS Permits £8.75 for an allocation of 5 Maximum of 120 in an academic year University

Doran, Simon J.

82

Portland's Commercial Solar Permitting Guide  

Broader source: Energy.gov [DOE]

This program guide outlines the application and review procedures for obtaining the necessary permits to install a solar energy system on a new or existing commercial building.

83

Identifying thresholds in pattern-process relationships: A new cross-scale interactions experiment at the Jornada Basin LTER  

E-Print Network [OSTI]

, their mortality has no direct effect on gap size or transport by wind and water. Patch-scale manipulations connectivity · Patch-scale abiotic process (wind) overwhelms plant-scale biotic processes. · InterMod treatment (resource redistribution by wind) Herbicide treatment (competition) Low: grassland High: shrubland

84

Solid Waste Permits (Louisiana)  

Broader source: Energy.gov [DOE]

The Louisiana Department of Environmental Quality administers the rules and regulations governing the storage, collection, processing, recovery, and reuse of solid waste protect the air,...

85

Overview of the Storm Water Individual Permit.pdf  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the LANL Storm Water Individual Permit? Poster, Individual Permit for Storm Water, NPDES Permit No...

86

CO2 Saline Storage Demonstration in Colorado Sedimentary Basins: Applied Studies in Reservoir Assessment and Dynamic Processes Affecting Industrial Operations  

SciTech Connect (OSTI)

This multitask research project was conducted in anticipation of a possible future increase in industrial efforts at CO2 storage in Colorado sedimentary basins. Colorado is already the home to the oldest Rocky Mountain CO2 storage site, the Rangely Oil Field, where CO2-EOR has been underway since the 1980s. The Colorado Geological Survey has evaluated storage options statewide, and as part of the SW Carbon Sequestration Partnership the Survey, is deeply engaged in and committed to suitable underground CO2 storage. As a more sustainable energy industry is becoming a global priority, it is imperative to explore the range of technical options available to reduce emissions from fossil fuels. One such option is to store at least some emitted CO2 underground. In this NETL-sponsored CO2 sequestration project, the Colorado School of Mines and our partners at the University of Colorado have focused on a set of the major fundamental science and engineering issues surrounding geomechanics, mineralogy, geochemistry and reservoir architecture of possible CO2 storage sites (not limited to Colorado). Those are the central themes of this final report and reported below in Tasks 2, 3, 4, and 6. Closely related to these reservoir geoscience issues are also legal, environmental and public acceptance concerns about pore space accessibility—as a precondition for CO2 storage. These are addressed in Tasks 1, 5 and 7. Some debates about the future course of the energy industry can become acrimonius. It is true that the physics of combustion of hydrocarbons makes it impossible for fossil energy to attain a carbon footprint anywhere nearly as low as that of renewables. However, there are many offsetting benefits, not the least that fossil energy is still plentiful, it has a global and highly advanced distribution system in place, and the footprint that the fossil energy infrastructure occupies is orders of magnitude smaller than renewable energy facilities with equivalent energy capacity. Finally, inexpensive natural gas here in North America is pushing coal for electricity generation off the market, thus reducing US CO2 emissions faster than any other large industrialized nation. These two big factors argue for renewed efforts to find technology solutions to reduce the carbon footprint (carbon dioxide as well as methane and trace gases) of conventional and unconventional oil and gas. One major such technology component is likely to be carbon capture, utilization and storage.

Nummedal, Dag; Sitchler, Alexis; McCray, John; Mouzakis, Katherine; Glossner, Andy; Mandernack, Kevin; Gutierrez, Marte; Doran, Kevin; Pranter, Matthew; Rybowiak, Chris

2012-09-30T23:59:59.000Z

87

Geohydrologic study of the Michigan Basin for the applicability of Jack W. McIntyre`s patented process for simultaneous gas recovery and water disposal in production wells  

SciTech Connect (OSTI)

Geraghty & Miller, Inc. of Midland, Texas conducted a geohydrologic study of the Michigan Basin to evaluate the applicability of Jack McIntyre`s patented process for gas recovery and water disposal in production wells. A review of available publications was conducted to identify, (1) natural gas reservoirs which generate large quantities of gas and water, and (2) underground injection zones for produced water. Research efforts were focused on unconventional natural gas formations. The Antrim Shale is a Devonian gas shale which produces gas and large quantities of water. Total 1992 production from 2,626 wells was 74,209,916 Mcf of gas and 25,795,334 bbl of water. The Middle Devonian Dundee Limestone is a major injection zone for produced water. ``Waterless completion`` wells have been completed in the Antrim Shale for gas recovery and in the Dundee Limestone for water disposal. Jack McIntyre`s patented process has potential application for the recovery of gas from the Antrim Shale and simultaneous injection of produced water into the Dundee Limestone.

Maryn, S.

1994-03-01T23:59:59.000Z

88

WIPP Hazardous Waste Facility Permit Update  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification request that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of dollars [3]. Combining both the chap. 311 and RH TRU waste permit modification requests allows for both the regulator and DOE to expedite action on the modification requests. The Combined PMR reduces costs by having only one administrative process for both modification requests. (authors)

Kehrman, B.; Most, W. [Washington Regulatory and Environmental Services, 4021 National Parks Highway, Carlsbad, NM 88220 (United States)

2006-07-01T23:59:59.000Z

89

Environmental Permitting of a Low-BTU Coal Gasification Facility  

E-Print Network [OSTI]

that merits serious consideration since only relatively small modifications to the existing oil or gas burner system may be required, and boiler derating can be minimized. The environmental permitting and planning process for a low-Btu coal gasification...

Murawczyk, C.; Stewart, J. T.

1983-01-01T23:59:59.000Z

90

Solar Construction Permitting Standards (California)  

Broader source: Energy.gov [DOE]

Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

91

Solar Permitting & Inspection Webinar Series  

Office of Energy Efficiency and Renewable Energy (EERE)

ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

92

Class 1 Permit Modification Notification  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bu il ding 1 Santa Fe, New Mexico 87505-6303 JUL 0 5 2011 Subject: Notification of a Class 1 Permit...

93

Well Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

Well permits are required for the installation of wells in private and public space. Wells are defined as any trest hole, shaft, or soil excavation created by any means including, but not limited...

94

Solar and Wind Permitting Laws  

Broader source: Energy.gov [DOE]

New Jersey has enacted three separate laws addressing local permitting practices for solar and wind energy facilities. The first deals with solar and wind facilities located in industrial-zoned...

95

Develop an effective Title V operating permit  

SciTech Connect (OSTI)

Under Title V of the 1990 Clean Air Act Amendments (CAAA), thousands of industrial and government facilities are required to apply for a comprehensive operating permit that addresses all the emission sources at a site and the CAA regulations that apply to them. The new permitting requirements apply to major sources only--although there are several definitions of a major source under the Amended Act. Because Title V applicability is based on potential to emit (PTE) rather than actual emissions, even small and medium sources may initially be subject to this program. Unlike other regulations, Title V puts the burden of demonstrating continuous compliance on source owners and operators. Careful attention to detail is necessary during the application process because the Title V permit is inherently an enforcement fool for the EPA and the general public. Noncompliance can lead to citizen suits and fines up to $25,000 per day. Therefore, it is critical to negotiate an operating permit that does not adversely impact current operations yet provides flexibility for future modifications. Each state and local agency has its own application forms and regulatory interpretations. Areas of complexity include the classification of emission units, the approach for the PTE calculation, the separation of federal and state-enforceable requirements, and the relationship between Title V and other CAAA titles. This article summarizes some lessons learned based upon experiences in various states. (It does not attempt to resolve program uncertainties among jurisdictions.) The practical strategies presented can be used for developing (or modifying) Title V applications as well as during permit negotiations.

Chadha, N.

1997-01-01T23:59:59.000Z

96

Developed by: Solar Permitting Work Group  

E-Print Network [OSTI]

of Governor Edmund G. Brown Jr. California Solar Permitting Guidebook Improving Permit Review and Approval for Small Solar Photovoltaic (PV) Systems June 2012 First Edition #12;California Solar Permitting Guidebook2 California Solar Permitting Guidebook Improving Permit Review and Approval for Small Solar Photovoltaic (PV

97

Section 404 permitting in coastal Texas from 1996 - 2003: patterns and effects on streamflow  

E-Print Network [OSTI]

This study explores the spatial-temporal patterns of Section 404 permitting program under the Clean Water Act and examines its impact on mean and peak annual streamflow. The study area consists of 47 sub-basins that are delineated based on USGS...

Highfield, Wesley E.

2009-05-15T23:59:59.000Z

98

Presidential Permit Holders - Annual Reports | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Presidential permit holders are responsible for reporting the gross amount electric energy which flows into and out of the United States over the permitted international...

99

Permitting of Consumptive Uses of Water (Florida)  

Broader source: Energy.gov [DOE]

Local water management districts are required to establish programs and regulations to provide for the permitting of consumptive uses of water. Such permitting programs are subject to the...

100

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia)  

Broader source: Energy.gov [DOE]

The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

TPDES General Permit No. TXR150000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

individual permit. This permit does not authorize the discharge or land disposal of any wastewater from concrete batch plants at regulated construction sites. Authorization for...

102

Advanced Chemistry Basins Model  

SciTech Connect (OSTI)

The DOE-funded Advanced Chemistry Basin model project is intended to develop a public domain, user-friendly basin modeling software under PC or low end workstation environment that predicts hydrocarbon generation, expulsion, migration and chemistry. The main features of the software are that it will: (1) afford users the most flexible way to choose or enter kinetic parameters for different maturity indicators; (2) afford users the most flexible way to choose or enter compositional kinetic parameters to predict hydrocarbon composition (e.g., gas/oil ratio (GOR), wax content, API gravity, etc.) at different kerogen maturities; (3) calculate the chemistry, fluxes and physical properties of all hydrocarbon phases (gas, liquid and solid) along the primary and secondary migration pathways of the basin and predict the location and intensity of phase fractionation, mixing, gas washing, etc.; and (4) predict the location and intensity of de-asphaltene processes. The project has be operative for 36 months, and is on schedule for a successful completion at the end of FY 2003.

William Goddard; Mario Blanco; Lawrence Cathles; Paul Manhardt; Peter Meulbroek; Yongchun Tang

2002-11-10T23:59:59.000Z

103

Modeling thermal convection in supradetachment basins: example from western Norway  

E-Print Network [OSTI]

Modeling thermal convection in supradetachment basins: example from western Norway A. SOUCHE*, M. DABROWSKI AND T. B. ANDERSEN Physics of Geological Processes (PGP), University of Oslo, Oslo, Norway basins of western Norway are examples of supradetachment basins that formed in the hanging wall

Andersen, Torgeir Bjørge

104

Water pollution Control Permit Fee Schedules (West Virginia)  

Broader source: Energy.gov [DOE]

This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national pollutant discharge elimination system permits issued by the...

105

Parking Options 2011/12 Reserved Permits  

E-Print Network [OSTI]

Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

106

Permits  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements into a single, comprehensive...

107

Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

108

Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

109

September 2012 BASIN RESEARCH AND ENERGY GEOLOGY  

E-Print Network [OSTI]

September 2012 BASIN RESEARCH AND ENERGY GEOLOGY STATE UNIVERSITY OF NEW YORK at BINGHAMTON research programs in geochemistry, sedimentary geology, or Earth surface processes with the potential the position, visit the Geological Sciences and Environmental Studies website (www.geology

Suzuki, Masatsugu

110

Genetic classification of petroleum basins  

SciTech Connect (OSTI)

Rather than relying on a descriptive geologic approach, this genetic classification is based on the universal laws that control processes of petroleum formation, migration, and entrapment. Petroleum basins or systems are defined as dynamic petroleum-generating and concentrating physico-chemical systems functioning on a geologic space and time scale. A petroleum system results from the combination of a generative subsystem (or hydrocarbon kitchen), essentially controlled by chemical processes, and a migration-entrapment subsystem, controlled by physical processes. The generative subsystem provides a certain supply of petroleum to the basin during a given geologic time span. The migration-entrapment subsystem receives petroleum and distributes it in a manner that can lead either to dispersion and loss or to concentration of the regional charge into economic accumulations. The authors classification scheme for petroleum basins rests on a simple working nomenclature consisting of the following qualifiers: (1) charge factor: undercharged, normally charged, or supercharged, (2) migration drainage factor: vertically drained or laterally drained, and (3) entrapment factor: low impedance or high impedance. Examples chosen from an extensive roster of documented petroleum basins are reviewed to explain the proposed classification.

Demaison, G.; Huizinga, B.J.

1989-03-01T23:59:59.000Z

111

RCRA, superfund and EPCRA hotline training module. Introduction to: Permits and interim status (40 cfr part 270) updated July 1996  

SciTech Connect (OSTI)

Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.

NONE

1996-07-01T23:59:59.000Z

112

Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations and Water Quality Certification (Mississippi)  

Broader source: Energy.gov [DOE]

The Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations...

113

Construction Permits and Fees (New Mexico)  

Broader source: Energy.gov [DOE]

Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

114

Market Power in Pollution Permit Markets  

E-Print Network [OSTI]

As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

Montero, Juan Pablo

115

300 area TEDF permit compliance monitoring plan  

SciTech Connect (OSTI)

This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

BERNESKI, L.D.

1998-11-20T23:59:59.000Z

116

Area- and site-specific geothermal leasing/permitting profiles; updated geothermal leasing/permitting performance assessment  

SciTech Connect (OSTI)

Sufficient discussion of the elements of the leasing and permitting programs is included to place the information developed in proper context. A table and process flow diagram developed previously which outline the steps in the non-competitive leasing process, is reprinted. Computer printout profiles are presented on 195 identifiable areas in the following states: Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. Sufficient information on the boundaries of these areas is contained in the report to permit identification of their general location on any map of the appropriate state which shows township and range locations.

Beeland, G.V.; Schumann, E.; Wieland, M.

1982-02-01T23:59:59.000Z

117

Sandia National Laboratories: Permitting, Inspection, and Interconnect...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tagged with: Energy * Inspecting * Interconnection * Permitting * photovoltaic * Photovoltaics * PV * Renewable Energy * solar * Solar Energy * Solar Market Transformation *...

118

Water Basins Civil Engineering  

E-Print Network [OSTI]

Water Basins Civil Engineering Objective · Connect the study of water, water cycle, and ecosystems with engineering · Discuss how human impacts can effect our water basins, and how engineers lessen these impacts: · The basic concepts of water basins are why they are important · To use a topographic map · To delineate

Provancher, William

119

Williston basin Seislog study  

SciTech Connect (OSTI)

This paper describes the results of Seislog (trade name) processing and interpretation of an east-west line in the North Dakota region of the Williston basin. Seislog processing involves inversion of the seismic trace data to produce a set of synthetic sonic logs. These resulting traces, which incorporate low-frequency velocity information, are displayed in terms of depth and isotransit times. These values are contoured and colored, based on a standard stratigraphic color scheme. The section studied is located just north of a dual producing oil pool from zones in the Ordovician Red River and Devonian Duperow Formations. A sonic log from the Long Creek 1 discovery well was digitized and filtered to match the frequency content of the original seismic data. This allows direct comparison between units in the well and the pseudosonic log (Seislog) trace nearest the well. Porosity development and lithologic units within the lower Paleozoic stratigraphic section can be correlated readily between the well and Seislog traces. Anomalous velocity zones within the Duperow and Red River Formations can be observed and correlated to producing intervals in the nearby wells. These results emphasize the importance of displaying inversion products that incorporate low-frequency data in the search for hydrocarbons in the Williston basin. The accumulations in this region are local in extent and are difficult to pinpoint by using conventional seismic data or displays. Seislog processing and displays provide a tested method for identification and delineation of interval velocity anomalies in the Red River and Duperow stratigraphic sections. These techniques can significantly reduce risks in both exploration and delineation drilling of these types of targets.

Mummery, R.C.

1985-02-01T23:59:59.000Z

120

Federal Environmental Permitting Handbook. Environmental Guidance  

SciTech Connect (OSTI)

The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

Not Available

1991-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits  

E-Print Network [OSTI]

ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits Visitor or Temporary Parking Permits will only be issued based on the following policies: Visitors · Visitors (Non WVU employees) to the Statler College can receive a single day visitor Parking Permit for lots 40, 41, 44

Mohaghegh, Shahab

122

PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT  

E-Print Network [OSTI]

PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT CONFINED SPACE GENERAL INFORMATION: Permit Number: Call 656-1297 Date: Equipment Number: Time Issued: Valid Until (Time, max. 8 hrs): Confined Space Description and Location: Purpose of Entry: PERMIT SPACE HAZARDS

Stuart, Steven J.

123

Annual Hanford Site Environmental Permitting status report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

124

Annual Hanford Site Environmental Permitting Status Report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

HOMAN, N.A.

2000-10-01T23:59:59.000Z

125

The WIPP Hazardous Waste Facility Permit Improvements--2007 Update  

SciTech Connect (OSTI)

The most significant changes to the Waste Isolation Pilot Plant Hazardous Waste Facility Permit to date were completed during the past year with the implementation of significant revisions to the Waste Analysis Plan and the authorization to dispose of remote-handled transuranic waste. The modified Permit removes the requirement for reporting headspace gas sampling and analysis results for every container of transuranic mixed waste and provides for the use of radiography and visual examination to confirm a statistically representative subpopulation of the waste stream in each waste shipment as well as other changes that streamline the analytical data management process. Implementation began on November 17, 2006. (authors)

Kehrman, R.; Most, W. [Washington Regulatory and Environmental Services, Carlsbad, NM (United States)

2007-07-01T23:59:59.000Z

126

Application for Permit to Construct Access Driveway Facilities...  

Open Energy Info (EERE)

ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Application for Permit to Construct Access Driveway...

127

State of Washington Joint Aquatic Resource Permit Application (JARPA)  

E-Print Network [OSTI]

all of the required permits, there is a greater likelihoodinform applicants on which permits they need, resulting inreduce the need for permit revisions that are currently

Manning, Sandra

2001-01-01T23:59:59.000Z

128

Multiplicity of investment equilibria when pollution permits are not tradable  

E-Print Network [OSTI]

M ONTERO , J. (2002): “Permits, standards, and technologyequilibria when pollution permits are not tradable Larryequilibria when pollution permits are not tradable Abstract

Karp, Larry

2006-01-01T23:59:59.000Z

129

Hanford facility dangerous waste permit application, general information portion  

SciTech Connect (OSTI)

The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal unit-specific Part B permit application, preclosure work plan, closure work plan, closure plan, closure/postclosure plan, or postclosure permit application documentation development, and the `Hanford Facility Resource Conservation and Recovery Act Permit` modification process. Revision 2 of the General Information Portion of the `Hanford Facility Dangerous Waste Permit Application` contains information current as of May 1, 1996. This document is a complete submittal and supersedes Revision 1.

Price, S.M., Westinghouse Hanford

1996-07-29T23:59:59.000Z

130

M-Area basin closure, Savannah River Site  

SciTech Connect (OSTI)

M-Area, on the Savannah River Site, processes raw materials and manufactures fuel and target rods for reactor use. Effluent from these processes were discharged into the M-Area settling basin and Lost Lake, a natural wetland. The closure of this basin began in 1988 and included the removal and stabilization of basin fluids, excavation of all contaminated soils from affected areas and Lost Lake, and placement of all materials in the bottom of the emptied basin. These materials were covered with a RCRA style cap, employing redundant barriers of kaolin clay and geosynthetic material. Restoration of excavated uplands and wetlands is currently underway.

McMullin, S.R.; Horvath, J.G.

1991-12-31T23:59:59.000Z

131

M-Area basin closure, Savannah River Site  

SciTech Connect (OSTI)

M-Area, on the Savannah River Site, processes raw materials and manufactures fuel and target rods for reactor use. Effluent from these processes were discharged into the M-Area settling basin and Lost Lake, a natural wetland. The closure of this basin began in 1988 and included the removal and stabilization of basin fluids, excavation of all contaminated soils from affected areas and Lost Lake, and placement of all materials in the bottom of the emptied basin. These materials were covered with a RCRA style cap, employing redundant barriers of kaolin clay and geosynthetic material. Restoration of excavated uplands and wetlands is currently underway.

McMullin, S.R.; Horvath, J.G.

1991-01-01T23:59:59.000Z

132

K Basins isolation barriers summary report  

SciTech Connect (OSTI)

The 105-K East and 105-K West fuel storage basins (105-K Basins) were designed and constructed in the early 1950`s for interim storage of irradiated fuel following its discharge from the reactors. The 105-K- East and 105-K West reactor buildings were constructed first, and the associated storage basins were added about a year later. The construction joint between each reactor building structure and the basin structure included a flexible membrane waterstop to prevent leakage. Water in the storage basins provided both radiation shielding and cooling to remove decay heat from stored fuel until its transfer to the Plutonium Uranium Extraction (PUREX) Facility for chemical processing. The 105-K West Reactor was permanently shut down in February 1970; the 105-K East Reactor was permanently shut down in February 1971. Except for a few loose pieces, fuel stored in the basins at that time was shipped to the PUREX Facility for processing. The basins were then left idle but were kept filled with water. The PUREX Facility was shut down and placed on wet standby in 1972 while N Reactor continued to operate. When the N Reactor fuel storage basin began to approach storage capacity, the decision was made to modify the fuel storage basins at 105-K East and 105-K West to provide additional storage capacity. Both basins were subsequently modified (105-K East in 1975 and 105-K West in 1981) to provide for the interim handling and storage of irradiated N Reactor fuel. The PUREX Facility was restarted in November 1983 to provide 1698 additional weapons-grade plutonium for the United States defense mission. The facility was shut down and deactivated in December 1992 when the U.S. Department of Energy (DOE) determined that the plant was no longer needed to support weapons-grade plutonium production. When the PUREX Facility was shut down, approximately 2.1 x 1 06 kg (2,100 metric tons) of irradiated fuel aged 7 to 23 years was left in storage in the 105-K Basins pending a decision on final disposition of the material. The Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1994), also known as the Tri-Party Agreement, commits to the removal of all fuel and sludge from the 105-K Basins by the year 2002.

Strickland, G.C., Westinghouse Hanford

1996-07-31T23:59:59.000Z

133

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

This Annual Hanford Site Environmental Permitting Status Report (Status Report) was prepared in response to requirements prescribed in U.S. Department of Energy (DOE) Order 5400.2A, `Environmental Compliance Issue Coordination`. This Order, canceled in April 1996, required that information on existing and anticipated environmental permitting for DOE facilities be submitted (or updated) annually by October 1 of each calendar year. Although the Order was canceled, the need for this Status Report still remains. For example, the Washington State Department of Ecology`s (Ecology) Dangerous Waste Permit Application Requirements (Publication Number 95-402, June 1996), Checklist Section J, calls for current information on existing and anticipated environmental permitting. As specified in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28), this Status Report serves as the vehicle for meeting this requirement for the Hanford Facility. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by the Resource Conservation and Recovery Act (RCRA) of 1976, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) are addressed. Information on RCRA and non-RCRA permitting is included and is current as of July 31, 1996.

Thompson, S.A.

1996-10-01T23:59:59.000Z

134

Catawba County- Green Construction Permitting Incentive Program  

Broader source: Energy.gov [DOE]

Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

135

Disclosure of Permitted Communication Concerning Fossil Fuel...  

Broader source: Energy.gov (indexed) [DOE]

DOE 433 ex parte memo.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No....

136

Disclosure of Permitted Communication Concerning Regional Standards...  

Broader source: Energy.gov (indexed) [DOE]

furnacestdwaiverpolicy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major...

137

Presidential Permits and Export Authorizations - Frequently Asked...  

Broader source: Energy.gov (indexed) [DOE]

design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or...

138

Wastewater Construction and Operation Permits (Iowa)  

Broader source: Energy.gov [DOE]

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

139

WPCF Underground Injection Control Disposal Permit Evaluation...  

Open Energy Info (EERE)

and Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: WPCF Underground Injection Control Disposal Permit Evaluation and Fact Sheet Abstract...

140

Groundwater Discharge Permit and Registration (New Hampshire)  

Broader source: Energy.gov [DOE]

The Groundwater Discharge Permitting and Registration Program seeks to protect groundwater quality by establishing standards, criteria, and procedures for wastewater discharges. The program...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Colorado Air Pollution Control Division - Construction Permits...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission...

142

River Basin Commissions (Indiana)  

Broader source: Energy.gov [DOE]

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

143

Permit Fees for Hazardous Waste Material Management (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

144

The geochemistry of uranium in the Orca Basin  

E-Print Network [OSTI]

no uranium enrichment, with concentrations ranging from 2. 1 to 4. gppm, reflective of normal Gulf of Mexico sediments. This is the result of two dominant processes operating within the basin. First, the sharp pycnocline at the brine/seawater interface... . . . . . . . . , . . . , 37 xi Figure Page 16 Ores Basin Seismic Reflection Profile A 40 17 Ores Basin Seismic Reflection Profile B 42 18 Proposed Mechanism of Uranium Uptake in the Atlantis II Deep 59 INTRODUCTION Economic Status of Uranium in the United States...

Weber, Frederick Fewell

1979-01-01T23:59:59.000Z

145

Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility  

SciTech Connect (OSTI)

The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

Not Available

1993-08-01T23:59:59.000Z

146

State waste discharge permit application, 200-E chemical drain field  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

Not Available

1994-06-01T23:59:59.000Z

147

Class 1 Permit Modification Notifications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

though it were mixed. The process design capacity for the miscellaneous unit (composed of ten underground HWMUs in the geologic repository) shown in Section 8 7 B, is for the...

148

K Basin safety analysis  

SciTech Connect (OSTI)

The purpose of this accident safety analysis is to document in detail, analyses whose results were reported in summary form in the K Basins Safety Analysis Report WHC-SD-SNF-SAR-001. The safety analysis addressed the potential for release of radioactive and non-radioactive hazardous material located in the K Basins and their supporting facilities. The safety analysis covers the hazards associated with normal K Basin fuel storage and handling operations, fuel encapsulation, sludge encapsulation, and canister clean-up and disposal. After a review of the Criticality Safety Evaluation of the K Basin activities, the following postulated events were evaluated: Crane failure and casks dropped into loadout pit; Design basis earthquake; Hypothetical loss of basin water accident analysis; Combustion of uranium fuel following dryout; Crane failure and cask dropped onto floor of transfer area; Spent ion exchange shipment for burial; Hydrogen deflagration in ion exchange modules and filters; Release of Chlorine; Power availability and reliability; and Ashfall.

Porten, D.R.; Crowe, R.D.

1994-12-16T23:59:59.000Z

149

THE ADVANCED CHEMISTRY BASINS PROJECT  

SciTech Connect (OSTI)

In the next decades, oil exploration by majors and independents will increasingly be in remote, inaccessible areas, or in areas where there has been extensive shallow exploration but deeper exploration potential may remain; areas where the collection of data is expensive, difficult, or even impossible, and where the most efficient use of existing data can drive the economics of the target. The ability to read hydrocarbon chemistry in terms of subsurface migration processes by relating it to the evolution of the basin and fluid migration is perhaps the single technological capability that could most improve our ability to explore effectively because it would allow us to use a vast store of existing or easily collected chemical data to determine the major migration pathways in a basin and to determine if there is deep exploration potential. To this end a the DOE funded a joint effort between California Institute of Technology, Cornell University, and GeoGroup Inc. to assemble a representative set of maturity and maturation kinetic models and develop an advanced basin model able to predict the chemistry of hydrocarbons in a basin from this input data. The four year project is now completed and has produced set of public domain maturity indicator and maturation kinetic data set, an oil chemistry and flash calculation tool operable under Excel, and a user friendly, graphically intuitive basin model that uses this data and flash tool, operates on a PC, and simulates hydrocarbon generation and migration and the chemical changes that can occur during migration (such as phase separation and gas washing). The DOE Advanced Chemistry Basin Model includes a number of new methods that represent advances over current technology. The model is built around the concept of handling arbitrarily detailed chemical composition of fluids in a robust finite-element 2-D grid. There are three themes on which the model focuses: chemical kinetic and equilibrium reaction parameters, chemical phase equilibrium, and physical flow through porous media. The chemical kinetic scheme includes thermal indicators including vitrinite, sterane ratios, hopane ratios, and diamonoids; and a user-modifiable reaction network for primary and secondary maturation. Also provided is a database of type-specific kerogen maturation schemes. The phase equilibrium scheme includes modules for primary and secondary migration, multi-phase equilibrium (flash) calculations, and viscosity predictions.

William Goddard; Peter Meulbroek; Yongchun Tang; Lawrence Cathles III

2004-04-05T23:59:59.000Z

150

File:05DrillingPermittingOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfa - DrillingPreApplicationProcess.pdfsource History

151

Hanford facility dangerous waste permit application, 616 Nonradioactive Dangerous Waste Storage Facility. Revision 2A  

SciTech Connect (OSTI)

This permit application for the 616 Nonradioactive Dangerous Waste Storage Facility consists for 15 chapters. Topics of discussion include the following: facility description and general provisions; waste characteristics; process information; personnel training; reporting and record keeping; and certification.

Bowman, R.C.

1994-04-01T23:59:59.000Z

152

The collision of Title III and Title V: A potential permitting and enforcement nightmare  

SciTech Connect (OSTI)

The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

Facca, G.; Faler, M.

1998-12-31T23:59:59.000Z

153

Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)  

SciTech Connect (OSTI)

Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

Levine, A.; Young, K.; Witherbee, K.

2013-10-01T23:59:59.000Z

154

Regulations and Permits Related to Dams (Vermont)  

Broader source: Energy.gov [DOE]

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

155

Aquatic Habitat Protection Permit (Saskatchewan, Canada)  

Broader source: Energy.gov [DOE]

The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of aquatic habitat and states that a permit is required: to alter the bed, bank or boundary of any water...

156

Flood Zone Building Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

Building permits are required for new construction and development in the Special Flood Hazard Areas (SFHA). All development projects in SFHA must comply with Title 12 DCMR and Title 20 DCMR...

157

Major Source Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

The District reviews designs for new pollution sources and design modifications for existing sources. Permits are issued to allow sources to emit limited and specified amounts of pollution as...

158

State Surface Water Discharge Permits (New Hampshire)  

Broader source: Energy.gov [DOE]

Rules apply to the discharge of all pollutants from a point source to surface waters of the state. The rule does not apply to facilities that require both a state discharge permit and a federal...

159

Alteration of Terrain Permits (New Hampshire)  

Broader source: Energy.gov [DOE]

This permit is required whenever a project proposes to disturb more than 100,000 square feet of contiguous terrain (50,000 square feet if any portion of project is within protected shoreland), or...

160

Wind Energy Permitting Standards (North Carolina)  

Broader source: Energy.gov [DOE]

North Carolina has statewide permitting requirements for wind energy facilities. Any wind turbine or collection of wind turbines located within a half mile of each other with a collective rated...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

City of Asheville- Building Permit Fee Waiver  

Broader source: Energy.gov [DOE]

The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

162

GEOCHEMICAL MODELING OF F AREA SEEPAGE BASIN COMPOSITION AND VARIABILITY  

SciTech Connect (OSTI)

From the 1950s through 1989, the F Area Seepage Basins at the Savannah River Site (SRS) received low level radioactive wastes resulting from processing nuclear materials. Discharges of process wastes to the F Area Seepage Basins followed by subsequent mixing processes within the basins and eventual infiltration into the subsurface resulted in contamination of the underlying vadose zone and downgradient groundwater. For simulating contaminant behavior and subsurface transport, a quantitative understanding of the interrelated discharge-mixing-infiltration system along with the resulting chemistry of fluids entering the subsurface is needed. An example of this need emerged as the F Area Seepage Basins was selected as a key case study demonstration site for the Advanced Simulation Capability for Environmental Management (ASCEM) Program. This modeling evaluation explored the importance of the wide variability in bulk wastewater chemistry as it propagated through the basins. The results are intended to generally improve and refine the conceptualization of infiltration of chemical wastes from seepage basins receiving variable waste streams and to specifically support the ASCEM case study model for the F Area Seepage Basins. Specific goals of this work included: (1) develop a technically-based 'charge-balanced' nominal source term chemistry for water infiltrating into the subsurface during basin operations, (2) estimate the nature of short term and long term variability in infiltrating water to support scenario development for uncertainty quantification (i.e., UQ analysis), (3) identify key geochemical factors that control overall basin water chemistry and the projected variability/stability, and (4) link wastewater chemistry to the subsurface based on monitoring well data. Results from this study provide data and understanding that can be used in further modeling efforts of the F Area groundwater plume. As identified in this study, key geochemical factors affecting basin chemistry and variability included: (1) the nature or chemistry of the waste streams, (2) the open system of the basins, and (3) duration of discharge of the waste stream types. Mixing models of the archetype waste streams indicated that the overall basin system would likely remain acidic much of the time. Only an extended periods of predominantly alkaline waste discharge (e.g., >70% alkaline waste) would dramatically alter the average pH of wastewater entering the basins. Short term and long term variability were evaluated by performing multiple stepwise modeling runs to calculate the oscillation of bulk chemistry in the basins in response to short term variations in waste stream chemistry. Short term (1/2 month and 1 month) oscillations in the waste stream types only affected the chemistry in Basin 1; little variation was observed in Basin 2 and 3. As the largest basin, Basin 3 is considered the primary source to the groundwater. Modeling showed that the fluctuation in chemistry of the waste streams is not directly representative of the source term to the groundwater (i.e. Basin 3). The sequence of receiving basins and the large volume of water in Basin 3 'smooth' or nullify the short term variability in waste stream composition. As part of this study, a technically-based 'charge-balanced' nominal source term chemistry was developed for Basin 3 for a narrow range of pH (2.7 to 3.4). An example is also provided of how these data could be used to quantify uncertainty over the long term variations in waste stream chemistry and hence, Basin 3 chemistry.

Millings, M.; Denham, M.; Looney, B.

2012-05-08T23:59:59.000Z

163

The impact of BASIN-scale oceanographic and climate-related processes on the dynamics of key plankton and fish populations in the North  

E-Print Network [OSTI]

plankton and fish populations in the North Atlantic ocean: Analysis, integration, synthesis and modelling-scale oceanographic and climate-related processes on the dynamics of key plankton and fish populations in the North 1997. No. 8. Report of the first planning meeting on Small Pelagic Fishes and Climate Change Program

deYoung, Brad

164

K Basins Hazard Analysis  

SciTech Connect (OSTI)

This report describes the methodology used in conducting the K Basins Hazard Analysis, which provides the foundation for the K Basins Safety Analysis Report (HNF-SD-WM-SAR-062, Rev.4). This hazard analysis was performed in accordance with guidance provided by DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports and implements the requirements of DOE Order 5480.23, Nuclear Safety Analysis Report.

WEBB, R.H.

1999-12-29T23:59:59.000Z

165

K Basin Hazard Analysis  

SciTech Connect (OSTI)

This report describes the methodology used in conducting the K Basins Hazard Analysis, which provides the foundation for the K Basins Final Safety Analysis Report. This hazard analysis was performed in accordance with guidance provided by DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports and implements the requirements of DOE Order 5480.23, Nuclear Safety Analysis Report.

PECH, S.H.

2000-08-23T23:59:59.000Z

166

Alcohol Services Category #1 # Permit Applica2on Category #2  

E-Print Network [OSTI]

Alcohol Services Category #1 # Permit Applica2on Category #2 Category #3 If an outdoor event, a;ach UNL Police approved licensed area plan to Permit Request ADMINISTRATOR TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT

Powers, Robert

167

State Waste Discharge Permit ST-4502 Implementation Plan  

SciTech Connect (OSTI)

Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

BROWN, M.J.; LECLAIR, M.D.

2000-09-27T23:59:59.000Z

168

Processes Influencing the Diversity of Middle Permian Brachiopods in the Bell Canyon Formation of the Delaware Basin (West Texas, Guadalupe Mountains National Park)  

E-Print Network [OSTI]

for the degree of DOCTOR OF PHILOSOPHY Approved by: Chair of Committee, Thomas D. Olszewski Committee Members, Wayne Ahr Anne Raymond Debbie Thomas Thomas Yancey Head of Department, Andreas Kronenberg August 2010 Major Subject: Geology iii... my dissertation, in the classroom, and in the field, I will be able to achieve success in my career. I also thank Dr. Anne Raymond, Dr. Debbie Thomas, Dr. Wayne Ahr, and Dr. Thomas Yancey for their advice and support through this process...

Fall, Leigh Margaret

2011-10-21T23:59:59.000Z

169

Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings  

SciTech Connect (OSTI)

Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

1995-12-31T23:59:59.000Z

170

ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...  

Open Energy Info (EERE)

use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

171

ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...  

Open Energy Info (EERE)

use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

172

Expedited Permitting of Grid-Scale Wind Energy Development (Maine)  

Broader source: Energy.gov [DOE]

Maine's Expedited Permitting of Grid-Scale Wind Energy Development statue provides an expedited permitting pathway for proposed wind developments in certain designated locations, known as expedited...

173

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from...

174

Abatement of Air Pollution: Permit to Construct and Operate Stationary...  

Broader source: Energy.gov (indexed) [DOE]

Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements,...

175

Application for Presidential Permit OE Docket No. PP-395 Emera...  

Broader source: Energy.gov (indexed) [DOE]

to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

176

Nevada Sample Application for Permit Under Utility Environmental...  

Open Energy Info (EERE)

Sample Application for Permit Under Utility Environmental Protection Act Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

177

City and County of Denver- Solar Panel Permitting (Colorado)  

Broader source: Energy.gov [DOE]

Construction, Electrical, Plumbing and Zoning Permits* are required for Photovoltaic (PV) systems installed in the city of Denver. Denver provides same day permit review for most solar panel...

178

Taxes, Permits, and the Adoption of Abatement Technology under...  

Open Energy Info (EERE)

Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance Jump to: navigation, search Name Taxes, Permits, and the Adoption of Abatement Technology under...

179

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Addendum to Presidential Permit Letter. TDI Presidential Permit Application Addendum.pdf More Documents & Publications PP-362 Champlain Hudson Power Express, Inc. Application for...

180

Application for presidential permit OE Docket No. PP-305 Montana...  

Broader source: Energy.gov (indexed) [DOE]

Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Broader source: Energy.gov (indexed) [DOE]

Border. Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company More Documents & Publications Application for Presidential Permit OE Docket No....

182

Request for Information on Permitting of Transmission Lines:...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

183

U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...  

Broader source: Energy.gov (indexed) [DOE]

2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

184

AUTHORIZATION FOR PAYROLL DEDUCTION 2012-2013 PARKING PERMIT  

E-Print Network [OSTI]

________________________________________________ DATE______________________________ $267.00 (ONE PERMIT) $66.00 (MOTORCYCLE PERMIT) $267.00 (TOTAL MONTH____________ OPTION FOR MOTORCYCLE DEDUCTION--1 MONTH______________ PLEASE INCLUDE YOUR CAMPUS

Escher, Christine

185

RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: Permits and interim status (40 CFR part 270) updated as of July 1995  

SciTech Connect (OSTI)

The module presents an overview of the RCRA permitting process and the requirements that apply to treatment, storage, and disposal facilities (TSDFs) operating under interim status until a permit is issued. It lists the types of activities that do and do not require a permit. It provides CFR cites for definitions of existing hazardous waste facility and new hazardous waste facility and identifies CFR sections relevant to Part A and Part B permit information requirements and describes the difference between them. It outlines steps in the process from interim status to receipt of permit. It identifies the differences among permit modification classes, and lists the special forms of permits. It lists the permit-by-rule applications, status and eligibility requirements for interim status and the conditions for termination of interim status and lists the conditions for changes during interim status.

NONE

1995-11-01T23:59:59.000Z

186

K Basin Hazard Analysis  

SciTech Connect (OSTI)

The K East (KE)/K West (KW) Basins in the 100 K Area of the Hanford Site have been used for storage of irradiated N Reactor and single-pass reactor fuel. Remaining spent fuel is continuing to be stored underwater in racks and canisters in the basins while fuel retrieval activities proceed to remove the fuel from the basins. The Spent Nuclear Fuel (SNF) Project is adding equipment to the facility in preparation for removing the fuel and sludge from the basins In preparing this hazard analysis, a variety of hazard analysis techniques were used by the K Basins hazard analysis team, including hazard and operability studies, preliminary hazard analyses, and ''what if'' analyses (WHC-SD-SNF-PHA-001, HNF-2032, HNF-2456, and HNF-SD-SNF-SAD-002). This document summarizes the hazard analyses performed as part of the safety evaluations for the various modification projects and combines them with the original hazard analyses to create a living hazard analysis document. As additional operational activities and modifications are developed, this document will be updated as needed to ensure it covers all the hazards at the K Basins in a summary form and to ensure the subsequent safety analysis is bounding. This hazard analysis also identifies the preliminary set of design features and controls that the facility could rely on to prevent or reduce the frequency or mitigate consequences of identified accident conditions based on their importance and significance to safety. The operational controls and institutional programs relied on for prevention or mitigation of an uncontrolled release are identified as potential technical safety requirements. All operational activities and energy sources at the K Basins are evaluated in this hazard analysis. Using a systematic approach, this document identifies hazards created by abnormal operating conditions and external events (e.g., earthquakes) that have the potential for causing undesirable consequences to the facility worker, the onsite individual, or the public. This report describes the methodology used in conducting the K Basins Hazard Analysis, which provides the foundation for the K Basins Final Safety Analysis Report. This hazard analysis was performed in accordance with guidance provided by DOE-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports and complies with the requirements of 10 CFR 830.

SEMMENS, L.S.

2001-04-20T23:59:59.000Z

187

Hanford facility dangerous waste permit application  

SciTech Connect (OSTI)

This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

none,

1991-09-18T23:59:59.000Z

188

EPA Citizens Guide to Hazardous Waste Permitting Process | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified as ASHRAEDuvalJustice webpage

189

Alaska Public Participation in APDES Permitting Process | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasilInformation 5-01 End DateInformation Alaska Public

190

Washington State’s Transportation Permit Efficiency and Accountability Committee (TPEAC)  

E-Print Network [OSTI]

as the Transportation Permit Efficiency and Accountability (the Transportation Permit Efficiency and Accountabilityrequired to obtain permits. Passage of the Transportation

Aberle, Barbara

2005-01-01T23:59:59.000Z

191

Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report  

SciTech Connect (OSTI)

The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

Not Available

1982-09-01T23:59:59.000Z

192

Community Charter Halibut Permit Application Page 1 of 5  

E-Print Network [OSTI]

PERMIT (CCHP) U.S. Department of Commerce NOAA National Marine Fisheries Service Alaska Region Restricted

193

Permitting of Wind Energy Facilities: A Handbook  

SciTech Connect (OSTI)

This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

NWCC Siting Work Group

2002-08-01T23:59:59.000Z

194

Air Quality: Construction Project Air Permit Requirements  

E-Print Network [OSTI]

Air Quality: Construction Project Air Permit Requirements Department: Chemical and General Safety Program: Air Quality Owner: Program Manager Authority: ES&H Manual, Chapter 30, Air Quality1 All manager or operator must submit the completed form to the air quality program manager before the project

Wechsler, Risa H.

195

UCSF Bicycle Permit Application Transportation Services  

E-Print Network [OSTI]

UCSF Bicycle Permit Application Transportation Services 500 Parnassus Ave, Box 0240 MU- P7 Room 26 ____________________________________________________________________ ____________________________ ______________________________ ____________________________________________________________________ Street City State Zip Home Phone Number Work Phone Number Bicycle Make Color Frame Serial #Bicycle Model 1. Bicycles which are not moved for a period of 7 days or longer will be tagged for removal

Yamamoto, Keith

196

Atmospheric dispersion in mountain valleys and basins  

SciTech Connect (OSTI)

The primary goal of the research is to further characterize and understand dispersion in valley and basin atmospheres. A secondary, and related goal, is to identify and understand the dominant physical processes governing this dispersion. This has been accomplished through a review of the current literature, and analyses of recently collected data from two field experiments. This work should contribute to an improved understanding of material transport in the atmospheric boundary layer. It was found that dispersion in a freely draining valley (Brush Creek valley, CO) atmosphere is much greater than in an enclosed basin (Roanoke, VA) atmosphere primarily because of the greater wind speeds moving past the release point and the greater turbulence levels. The development of a cold air pool in the Roanoke basin is the dominant process governing nighttime dispersion in the basin, while the nighttime dispersion in the Brush Creek valley is dominated by turbulent diffusion and plume confinement between the valley sidewalls. The interaction between valley flows and above ridgetops flows is investigated. A ventilation rate'' of material transport between the valley and above ridgetop flows is determined. This is important in regional air pollution modeling and global climate modeling. A simple model of dispersion in valleys, applicable through a diurnal cycle, is proposed.

Allwine, K.J.

1992-01-01T23:59:59.000Z

197

Atmospheric dispersion in mountain valleys and basins  

SciTech Connect (OSTI)

The primary goal of the research is to further characterize and understand dispersion in valley and basin atmospheres. A secondary, and related goal, is to identify and understand the dominant physical processes governing this dispersion. This has been accomplished through a review of the current literature, and analyses of recently collected data from two field experiments. This work should contribute to an improved understanding of material transport in the atmospheric boundary layer. It was found that dispersion in a freely draining valley (Brush Creek valley, CO) atmosphere is much greater than in an enclosed basin (Roanoke, VA) atmosphere primarily because of the greater wind speeds moving past the release point and the greater turbulence levels. The development of a cold air pool in the Roanoke basin is the dominant process governing nighttime dispersion in the basin, while the nighttime dispersion in the Brush Creek valley is dominated by turbulent diffusion and plume confinement between the valley sidewalls. The interaction between valley flows and above ridgetops flows is investigated. A ``ventilation rate`` of material transport between the valley and above ridgetop flows is determined. This is important in regional air pollution modeling and global climate modeling. A simple model of dispersion in valleys, applicable through a diurnal cycle, is proposed.

Allwine, K.J.

1992-01-01T23:59:59.000Z

198

System Description for the KW Basin Integrated Water Treatment System (IWTS) (70.3)  

SciTech Connect (OSTI)

This is a description of the system that collects and processes the sludge and radioactive ions released by the spent nuclear fuel (SNF) processing operations conducted in the 105 KW Basin. The system screens, settles, filters, and conditions the basin water for reuse. Sludge and most radioactive ions are removed before the water is distributed back to the basin pool. This system is part of the Spent Nuclear Fuel Project (SNFP).

DERUSSEAU, R.R.

2000-04-18T23:59:59.000Z

199

EFFECTIVE ENVIRONMENTAL COMPLIANCE STRATEGY FOR THE CLEANUP OF K BASINS AT HANFORD SITE WASHINGTON  

SciTech Connect (OSTI)

K Basins, consisting of two water-filled storage basins (KW and KE) for spent nuclear fuel (SNF), are part of the 100-K Area of the Hanford Site, along the shoreline of the Columbia River, situated approximately 40 km (25 miles) northwest of the City of Richland, Washington. The KW contained 964 metric tons of SNF in sealed canisters and the KE contained 1152 metric tons of SNF under water in open canisters. The cladding on much of the fuel was damaged allowing the fuel to corrode and degrade during storage underwater. An estimated 1,700 cubic feet of sludge, containing radionuclides and sediments, have accumulated in the KE basin. Various alternatives for removing and processing the SNF, sludge, debris and water were originally evaluated, by USDOE (DOE), in the Environmental Impact Statement (EIS) with a preferred alternative identified in the Record of Decision. The SNF, sludge, debris and water are ''hazardous substances'' under the Comprehensive, Environmental, Response, Compensation and Liability Act of 1980 (CERCLA). Leakage of radiologically contaminated water from one of the basins and subsequent detection of increased contamination in a down-gradient monitoring well helped to form the regulatory bases for cleanup action under CERCLA. The realization that actual or threatened release of hazardous substances from the waste sites and K Basins, if not addressed in a timely manner, may present an imminent and substantial endangerment to public health, welfare and environment led to action under CERCLA, with EPA as the lead regulatory agency. Clean-up of the K Basins as a CERCLA site required SNF retrieval, processing, packaging, vacuum drying and transport to a vaulted storage facility for storage, in conformance with a quality assurance program approved by the Office of Civilian Radioactive Waste Management (OCRWM). Excluding the facilities built for SNF drying and vaulted storage, the scope of CERCLA interim remedial action was limited to the removal of fuel, sludge, debris and water. At present, almost all of the spent fuel has been removed from the basins and other activities to remove sludge, debris and water are scheduled to be completed in 2007. Developing environmental documentation and obtaining regulatory approvals for a project which was initiated outside CERCLA and came under CERCLA during execution, was a significant priority to the successful completion of the SNF retrieval, transfer, drying, transport and storage of fuel, within the purview of strong conduct-of-operations culture associated with nuclear facilities. Environmental requirements promulgated in the state regulations by Washington Department of Public Health for radiation were recognized as ''applicable or relevant and appropriate.'' Effective implementation of the environmental compliance strategy in a project that transitioned to CERCLA became a significant challenge involving multiple contractors. This paper provides an overview of the development and implementation of an environmental permitting and surveillance strategy that enabled us to achieve full compliance in a challenging environment, with milestones and cost constraints, while meeting the high safety standards. The details of the strategy as to how continuous rapport with the regulators, facility operators and surveillance groups helped to avoid impacts on the clean-up schedule are discussed. Highlighted are the role of engineered controls, surveillance protocols and triggers for monitoring and reporting, and active administrative controls that were established for the control of emissions, water loss and transport of waste shipments, during the different phases of the project.

AMBALAM, T.

2004-12-01T23:59:59.000Z

200

C.R.S. 37-90-137 - Permits to Construct Wells Outside Designated Basins |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Areais aBurkittsville,Bushyhead,ButtsC & LOpen Energy

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Geothermal energy development in Washington State. A guide to the federal, state and local regulatory process  

SciTech Connect (OSTI)

Washington State's geothermal potential is wide spread. Hot springs and five strato volcanoes existing throughout the Cascade Range, limited hot spring activity on the Olympic Peninsula, and broad reaching, low temperature geothermal resources found in the Columbia Basin comprise the extent of Washington's known geothermal resources. Determination of resource ownership is the first step in proceeding with geothermal exploration and development activities. The federal and state processes are examined from pre-lease activity through leasing and post-lease development concerns. Plans, permits, licenses, and other requirements are addressed for the federal, state, and local level. Lease, permit, and other forms for a number of geothermal exploration and development activities are included. A map of public lands and another displaying the measured geothermal resources throughout the state are provided.

Bloomquist, R.G.; Simpson, S.J.

1986-03-01T23:59:59.000Z

202

Montana 310 Permit Database | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate Zone Subtype A. PlacesEnergy Information WaterPermit

203

Hanford Site air operating permit application  

SciTech Connect (OSTI)

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

204

Alaska Oil and Gas Exploration, Development, and Permitting Project  

SciTech Connect (OSTI)

This is the final technical report for Project 15446, covering the grant period of October 2002 through March 2006. This project connects three parts of the oil exploration, development, and permitting process to form the foundation for an advanced information technology infrastructure to better support resource development and resource conservation. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells. The broad goal of this grant is to increase domestic production from Alaska's known producing fields through the implementation of preferred upstream management practices. (PUMP). Internet publication of extensive and detailed geotechnical data is the first task, improving the permitting process is the second task, and building an advanced geographical information system to offer continuing support and public access of the first two goals is the third task. Excellent progress has been made on all three tasks; the technical objectives as defined by the approved grant sub-tasks have been met. The end date for the grant was March 31, 2006.

Richard McMahon; Robert Crandall

2006-03-31T23:59:59.000Z

205

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING  

SciTech Connect (OSTI)

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

Langton, C.; Blankenship, J.; Griffin, W.; Serrato, M.

2009-12-03T23:59:59.000Z

206

K East Basin sludge volume estimates for integrated water treatment system  

SciTech Connect (OSTI)

Estimates were made of the volume of sludge expected from Integrated Process Strategy (IPS) processing fuel elements and in the fuel storage canisters in K East Basin, These were based on visual observations of fuel element condition in the basin and laboratory measurements of canister sludge density. The estimates, made in early 1997, are reviewed and the basic assumptions used discussed.

Pitner, A.L.

1998-08-12T23:59:59.000Z

207

Construction Endorsement Process in Russia.  

E-Print Network [OSTI]

??The construction endorsement and receiving of construction permit is a long lasting and very complicated process in Russia. There is no one and only instruction… (more)

Avanesov, Alexander

2010-01-01T23:59:59.000Z

208

Permit Types, Tiers, and Parking Privileges 2012-2013 Alr 07-01-2012 1  

E-Print Network [OSTI]

loading permit from booth. M (motorcycle permit) Motorcycle Spaces ME (Maple Avenue Complex) Perimeter

209

ADVANCED CHEMISTRY BASINS MODEL  

SciTech Connect (OSTI)

The advanced Chemistry Basin Model project has been operative for 48 months. During this period, about half the project tasks are on projected schedule. On average the project is somewhat behind schedule (90%). Unanticipated issues are causing model integration to take longer then scheduled, delaying final debugging and manual development. It is anticipated that a short extension will be required to fulfill all contract obligations.

William Goddard III; Lawrence Cathles III; Mario Blanco; Paul Manhardt; Peter Meulbroek; Yongchun Tang

2004-05-01T23:59:59.000Z

210

Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)  

Broader source: Energy.gov [DOE]

The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

211

Hazardous Waste Facility Permit Public Comments to Community...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

covered by the permit. Please use another word for "promulgated," such as "created." This section should state that it is a ten-year permit, set to expire in November 2020. It...

212

Experiment Hazard Class 15.2 - USDA Soil Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

shipment, and disposal of regulated soil samples. A copy of the current APS USDA Soil Permit must accompany all samples. A copy of the home institution's soil permit is required...

213

Exclusionary manipulation of carbon permit markets: a laboratory test  

E-Print Network [OSTI]

The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

Carlén, Björn.

214

V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2.3.3.216 Addthis Related Articles U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-144:Juniper Secure Access Input Validation Flaw Permits...

215

RCRA Hazardous Waste Part A Permit Application: Instructions...  

Open Energy Info (EERE)

Part A Permit Application: Instructions and Form (EPA Form 8700-23) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit...

216

UPDES General Permit for Discharges from Construction Activities...  

Open Energy Info (EERE)

Discharges from Construction Activities (Permit No. UTRC00000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: UPDES General Permit...

217

Innovation and Success in Solar Permitting and Inspection  

Broader source: Energy.gov [DOE]

This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects.

218

On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish)  

E-Print Network [OSTI]

This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

Lesikar, Bruce J.

2005-04-30T23:59:59.000Z

219

Standardized Permit Guidance | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland,0162112°,St. Charles isStallings,Standardized Permit

220

Susquehanna River Basin Compact (Maryland)  

Broader source: Energy.gov [DOE]

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Rappahannock River Basin Commission (Virginia)  

Broader source: Energy.gov [DOE]

The Rappahannock River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the...

222

California Basin Studies (CaBS). Final contract report  

SciTech Connect (OSTI)

The California Continental Borderland`s present configuration dates from about 4 to 5 X 10{sup 6} years Before Present (B.P.) and is the most recent of several configurations of the southern California margin that have evolved after the North America Plate over-rode the East Pacific Rise about 30 X 10{sup 6} years ago. The present morphology is a series of two to three northwest-southeast trending rows of depressions separated by banks and insular ridges. Two inner basins, Santa Monica and San Pedro, have been the site for the Department of Energy-funded California Basin Study (CaBS) Santa Monica and San Pedro Basins contain post-Miocene sediment thicknesses of about 2.5 and 1.5 km respectively. During the Holocene (past 10,000 years) about 10-12 m have accumulated. The sediment entered the basin by one or a combination of processes including particle infall (mainly as bioaggregates) from surface waters, from nepheloid plumes (surface, mid-depths and near-bottom), from turbidity currents, mass movements, and to a very minor degree direct precipitation. In Santa Monica Basin, during the last century, particle infall and nepheloid plume transport have been the most common processes. The former dominates in the central basin floor in water depths from 900 to 945 m. where a characteristic silt-clay with a typical mean diameter of about 0.006 mm, phi standard deviation.

Gorsline, D.S.

1991-12-31T23:59:59.000Z

223

CSEM WP 113 Using Environmental Emissions Permit Prices to Raise  

E-Print Network [OSTI]

CSEM WP 113 Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market analyzes the extent to which the conditions in the emissions permit market for oxides of nitrogen (NOx

California at Berkeley. University of

224

U of O Retired Staff Parking Permit Application  

E-Print Network [OSTI]

U of O Retired Staff Parking Permit Application Please Print Last Name Faculty Retired Non-tenure track instructor Retired Officer of Research Type of parking permit desired (no cost for permit) Payment Method: I intend to pay immediately, in full, using cash, check, Visa orf

Cina, Jeff

225

T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services  

E-Print Network [OSTI]

T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services Temporary Disabled Person Parking Permit Request Form Parking & Transportation Services (657) 278-3082 / Fax (657) 278-4533 Temporary Disabled Person permits will be issued after completion of Section II by Disabled Student Services

de Lijser, Peter

226

Alcohol Services Category #1 # Permit Application Category #2  

E-Print Network [OSTI]

Alcohol Services Category #1 # Permit Application Category #2 Category #3 Facility to be Used If an outdoor event, attach UNL Police approved licensed area plan to Permit Request. This individual may TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT. THE APPROVED CATERER IS RESPONSIBLE

Powers, Robert

227

Annual report of 1991 groundwater monitoring data for the Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin at the Y-12 Plant: Reporting and statistical evaluation of the subsequent year (sixth) data  

SciTech Connect (OSTI)

This annual report has historically been prepared to meet the annual reporting requirements of the Tennessee Department of and Environment and Conservation (TDEC), Hazardous Waste Management Regulation 1200-1-11-.05 (6)(e), for detection monitoring data collected on Resource Conservation and Recovery Act (RCRA) wells in place around facilities which are accorded interim status. The regulatory authority for these units at the Y-12 Plant is currently in transition. A Federal Facility Agreement (FFA) with an effective date of January 1, 1992, has been negotiated with the Department of Energy (DOE) for the Oak Ridge Reservation. This agreement provides a framework for remediation of the Oak Ridge Reservation so that both RCRA and CERCLA requirements are integrated into the remediation process and provides for State, EPA, and DOE to proceed with CERCLA as the lead regulatory requirement and RCRA as an applicable or relevant and appropriate requirement. This report is presented for the RCRA certified wells for two interim status units at the Y-12 Plant. These units are Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin. Kerr Hollow is currently undergoing clean closure under RCRA. The Chestnut Ridge Sediment Disposal Basin (CRSDB) was closed in 1989 under a TDEC approved RCRA closure plan. The relevance of a RCRA Post-Closure Permit to either of these units is a matter of contention between DOE and TDEC since the FFA does not contemplate post-closure permits.

McMahon, L.W. [Oak Ridge National Lab., TN (United States); Mercier, T.M. [H and R Technical Associates, Inc., Oak Ridge, TN (United States)] [comps.

1992-02-01T23:59:59.000Z

228

Negotiating Title V and non-Title V permits  

SciTech Connect (OSTI)

The Title V Operating Permits program has been extended over many more years than originally anticipated when the 1990 Clean Air Act Amendments were first legislated. In fact, the regulatory program is still being refined even as facilities complete and submit their Title V permit applications. Likewise, it is clear that the agency review of the Title V permit applications will probably take considerably longer than originally anticipated. Finally, when the agency does complete the review, it is equally clear that there will need to be a significant amount of negotiating on the part of the facility to arrive at a simplified permit that is operationally feasible. This paper presents a number of suggestions for what the facility should be doing between the time the permit application is first submitted and the agency responds with a draft permit. The suggestions are designed to help simplify the permit and enhance flexibility. In addition, the paper presents permit negotiating techniques and points out the pitfalls that will be encountered if the facility does not take action prior to receiving the draft Title V permit. This paper suggests that the facility should internally evaluate how the permit application impacts facility operations prior to the agency doing so. It also suggests that the facility should contact the agency early and amend the permit application to take advantage of increasing regulatory flexibility. By taking these steps, and properly negotiating the permit terms and conditions; the facility will achieve a much better permit, and will hopefully be able to avoid the regulatory burdens and delays associated with re-opening the permit during the next 5 to 8 years (from the time of permit application submittal).

Erbes, R.E. [Kleinfelder, Inc., Parker, CO (United States); MacDougall, C.R. [Kleinfelder, Inc., Pleasanton, CA (United States)

1998-12-31T23:59:59.000Z

229

Basin-Scale Opportunity Assessment Initiative Background Literature Review  

SciTech Connect (OSTI)

As called for in the March 24, 2010, Memorandum of Understanding (MOU) for Hydropower, the U.S. Department of Energy (DOE), the U.S. Department of the Interior (DOI), the U.S. Army Corps of Engineers (USACE), environmental stakeholders, and the hydropower industry are collaborating to identify opportunities to simultaneously increase electricity generation and improve environmental services in river basins of the United States. New analytical tools provide an improved ability to understand, model, and visualize environmental and hydropower systems. Efficiencies and opportunities that might not be apparent in site-by-site analyses can be revealed through assessments at the river-basin scale. Information from basin-scale assessments could lead to better coordination of existing hydropower projects, or to inform siting decisions (e.g., balancing the removal of some dams with the construction of others), in order to meet renewable energy production and environmental goals. Basin-scale opportunity assessments would inform energy and environmental planning and address the cumulative effects of hydropower development and operations on river basin environmental quality in a way that quantifies energy-environment tradeoffs. Opportunity assessments would create information products, develop scenarios, and identify specific actions that agencies, developers, and stakeholders can take to locate new sustainable hydropower projects, increase the efficiency and environmental performance of existing projects, and restore and protect environmental quality in our nation's river basins. Government agencies and non-governmental organizations (NGO) have done significant work to understand and assess opportunities for both hydropower and environmental protection at the basin scale. Some initiatives have been successful, others less so, and there is a need to better understand the legacy of work on which this current project can build. This background literature review is intended to promote that understanding. The literature review begins with a discussion in Section 2.0 of the Federal regulatory processes and mission areas pertaining to hydropower siting and licensing at the basin scale. This discussion of regulatory processes and mission areas sets the context for the next topic in Section 3.0, past and ongoing basin-scale hydropower planning and assessment activities. The final sections of the literature review provide some conclusions about past and ongoing basin-scale activities and their relevance to the current basin-scale opportunity assessment (Section 4.0), and a bibliography of existing planning and assessment documents (Section 5.0).

Saulsbury, Bo [ORNL; Geerlofs, Simon H. [Pacific Northwest National Laboratory (PNNL); Cada, Glenn F [ORNL; Bevelhimer, Mark S [ORNL

2010-10-01T23:59:59.000Z

230

Permit Allocation in Emissions Trading using the Boltzmann Distribution  

E-Print Network [OSTI]

In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...

Park, Ji-Won; Isard, Walter

2011-01-01T23:59:59.000Z

231

Advanced Chemistry Basins Model  

SciTech Connect (OSTI)

The objective of this project is to: (1) Develop a database of additional and better maturity indicators for paleo-heat flow calibration; (2) Develop maturation models capable of predicting the chemical composition of hydrocarbons produced by a specific kerogen as a function of maturity, heating rate, etc.; assemble a compositional kinetic database of representative kerogens; (3) Develop a 4 phase equation of state-flash model that can define the physical properties (viscosity, density, etc.) of the products of kerogen maturation, and phase transitions that occur along secondary migration pathways; (4) Build a conventional basin model and incorporate new maturity indicators and data bases in a user-friendly way; (5) Develop an algorithm which combines the volume change and viscosities of the compositional maturation model to predict the chemistry of the hydrocarbons that will be expelled from the kerogen to the secondary migration pathways; (6) Develop an algorithm that predicts the flow of hydrocarbons along secondary migration pathways, accounts for mixing of miscible hydrocarbon components along the pathway, and calculates the phase fractionation that will occur as the hydrocarbons move upward down the geothermal and fluid pressure gradients in the basin; and (7) Integrate the above components into a functional model implemented on a PC or low cost workstation.

Blanco, Mario; Cathles, Lawrence; Manhardt, Paul; Meulbroek, Peter; Tang, Yongchun

2003-02-13T23:59:59.000Z

232

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

Hemmert, Karl Scott; Underwood, Keith D

2014-04-01T23:59:59.000Z

233

Hawaii Clean Energy Initiative Permit to Cross or Enter the State...  

Open Energy Info (EERE)

Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Initiative Permit to Cross or Enter the State Energy CorridorPermitting...

234

EU-California Environmental Agreements: The Role of Trade in Emissions Permits and Escape Clauses  

E-Print Network [OSTI]

the role of trade in emissions permits and escape clauses. (agreements. Trade in emissions permits has ambiguous and inAlthough trade in emissions permits reduces the aggregate

Karp, Larry; Zhao, Jinhua

2008-01-01T23:59:59.000Z

235

When to Pollute, When to Abate? Intertemporal Permit Use in the Los Angeles NOx Market  

E-Print Network [OSTI]

such as overlapping cycles of permits, can increase theproblems of bankable permits. References Carlson, Dale A.to Abate? Intertemporal Permit Use in the Los Angeles NO x

Holland, Stephen P.; MOORE, MICHAEL R

2008-01-01T23:59:59.000Z

236

Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market  

E-Print Network [OSTI]

Environmental Emissions Permit Prices to Raise ElectricityEnvironmental Emissions Permit Prices to Raise Electricitythe conditions in the emissions permit market for oxides of

Kolstad, Jonathan; Wolak, Frank

2003-01-01T23:59:59.000Z

237

Non-native grasses alter evapotranspiration and energy balance in Great Basin sagebrush communities  

E-Print Network [OSTI]

Non-native grasses alter evapotranspiration and energy balance in Great Basin sagebrush communities Avenue, Urbana, IL 61801, United States Received 19 April 2006; accepted 23 August 2006 Abstract Over key ecosystem processes in the Great Basin, including hydrology and energy balance. To determine how

DeLucia, Evan H.

238

Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1  

SciTech Connect (OSTI)

In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

Not Available

1993-03-24T23:59:59.000Z

239

Division of Oil, Gas, and Mining Permitting  

E-Print Network [OSTI]

" or "Gas" does not include any gaseous or liquid substance processed from coal, oil shale, or tar sands

Utah, University of

240

Notice of Termination for Authorization under TPDES General Permit...  

Open Energy Info (EERE)

Termination for Authorization under TPDES General Permit (TXR150000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Notice of Termination for...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Innovation and Success in Solar Permitting and Inspections  

Broader source: Energy.gov (indexed) [DOE]

Webinar 2: Innovation and Success in Solar Permitting and Inspections Transcript June 26, 2013 Speaker: Courtney Kendal Slide 1: Good afternoon. My name is Courtney Kendall,...

242

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture...

243

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

border. Notice of Intervention from Dept of Agriculture.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept....

244

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Comments from Dept of Agriculture 08-28-13.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by...

245

Optimizing operational flexibility and enforcement liability in Title V permits  

SciTech Connect (OSTI)

Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

McCann, G.T. [Rust Environment and Infrastructure Inc., Greenville, SC (United States)

1997-12-31T23:59:59.000Z

246

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2013 Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project: Federal Register Notice, Volume 78, No. 146 - July 30, 2013 Application...

247

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Correction Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction...

248

Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)  

SciTech Connect (OSTI)

Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

Young, K.

2014-04-01T23:59:59.000Z

249

Application for Presidential Permit OE Docket No. PP-369 British...  

Broader source: Energy.gov (indexed) [DOE]

69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission...

250

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Peggy Wilson Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson Application from Soule Hydro to...

251

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct, operate and...

252

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application from Soule Hydro to construct, operate...

253

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Conservation Law Foundation, Appalachian Mountain Club, and Society for the Protection of New Hampshire Forests Application for Presidential Permit OE Docket No. PP-371 Northern...

254

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Broader source: Energy.gov (indexed) [DOE]

Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

255

Request for Information on Improving Performance of Federal Permitting...  

Broader source: Energy.gov (indexed) [DOE]

of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of...

256

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Ann Vennerbeck Application for...

257

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Transmission.pdf More Documents & Publications Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal...

258

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

PassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for...

259

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Canada Border. Identification of Preferred Alternative for Permit Amendment. PREFERREDALTERNATIVEPermitAmendmentof28Feb12.pdf More Documents & Publications PP-362 Champlain...

260

Application for presidential permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

electric transmission facilities at the U.S. - Canada Border. FINAL TDI Presidential Permit Application. January 25, 2010 More Documents & Publications EIS-0447: Draft...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Courtney Kearley Application for...

262

NMDOT Application for Permit to Install Utility Facilities Within...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

263

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Motion to Intervene.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from The Weeks Lancaster Trust...

264

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Northern Trans Line.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Notice of...

265

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

lishaGrayPP-371Comment.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

266

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hayes Application for...

267

Air Emissions Operating Permit Regulations for the Purposes of...  

Broader source: Energy.gov (indexed) [DOE]

Regulations Provider Department of Environmental Quality The Air Emissions Operating Permit Regulations for the Purpose of Title V of the Federal Clean Air Act make the state...

268

Application for Presidential Permit OE Docket No. PP-044 Northern...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-44 Northern Electric Cooperative Association More Documents &...

269

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

division of ALLETE, Inc., has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the...

270

Application for Presidential Permit OE Docket No: PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

ShoemakerComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application for...

271

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

appaportPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

272

Application for presidential permit OE Docket No. PP-305 Montana...  

Broader source: Energy.gov (indexed) [DOE]

Scope Change 1 PP-305 Montana Alberta Tie LTD More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update...

273

Application for presidential permit OE Docket No. PP-334 Energia...  

Broader source: Energy.gov (indexed) [DOE]

Juarez U.S Trainsmission LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of Decision...

274

Application for Presidential Permit OE Docket No. PP-235 Sempra...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Mexico Border. Application for Presidential Permit OE Docket No. 235 Sempra Energy Resources. More Documents & Publications PP-235 Sempra...

275

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

BrownsonComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application for...

276

Application for presidential permit OE Docket No. PP-300 Maine...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-300 Maine Public Service Company More Documents & Publications PP-300...

277

Application for Presidential Permit OE Docket No. PP-299 Sea...  

Broader source: Energy.gov (indexed) [DOE]

electric transmission facilitites at the U.S. - Canada Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC More...

278

Application for Presidential Permit OE Docket No. PP-366 Twin...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-366 Twin Rivers Paper Company, Inc. More Documents & Publications...

279

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Broader source: Energy.gov (indexed) [DOE]

iceFR3886907092014.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-400 TDI-New England - New England Clean Power Link Project...

280

Application for presidential permit OE Docket No. PP-334 Baja...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC More Documents & Publications...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

The Nature Conservancy.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for...

282

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Bruce Adami Application for...

283

Amended Application for Presidential Permit OE Docket No: PP...  

Broader source: Energy.gov (indexed) [DOE]

Amended Application of Northern Pass Transmission LLC for Presidential Permit Exhibit 1 - Opinion of Counsel Exhibit 2 - General Area Map of Proposed Route Exhibit 3 - Diagrams of...

284

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst Application for...

285

Application for Presidential Permit OE Docket No. PP-059 Central...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Mexico Border Application for Presidential Permit OE Docket No. PP-59 Central Power and Light Company (CPL) More Documents &...

286

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

border.. Federal Register Notice Vol 75 No 220. Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC More Documents & Publications...

287

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Rana Klug Application for...

288

Application for presidential permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. EIS-0447: Amended Notice of...

289

NMSLO Application for Permit to Conduct Geophysical Exploration...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Application for Permit to Conduct Geophysical Exploration on Unleased State LandsLegal Published NA Year...

290

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission: Comments from William and Michelle...

291

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

from James Kennedy.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James...

292

Application for Presidential Permit OE Docket No. PP-334 Energia...  

Broader source: Energy.gov (indexed) [DOE]

DOE announces its decision to issue a Presidential Permit to Energia Sierra Juarez U.S, Transmission, LLC (ESJ) to construct, operate and maintain electric transmission facilities...

293

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lorna Rose Application for...

294

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Pass Transmission, LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder...

295

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Board of Commissioners.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal...

296

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

elMarinoPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder...

297

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Energy Savers [EERE]

Register Notice, Volume 79, No. 124, June 27, 2014 Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Notice of...

298

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Broader source: Energy.gov (indexed) [DOE]

Border: Federal Register Notice. Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company: Federal Register Notice, Volume 65, No. 183 More Documents...

299

Application for presidential permit OE Docket No. PP-305 Montana...  

Broader source: Energy.gov (indexed) [DOE]

Federal Register Notice Vol 70 No 210. Application for presidential permit OE Docket No. 305 Montana Alberta Tie Ltd More Documents & Publications PP-305 Montana Alberta Tie Ltd...

300

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

of Counsel - 20140609.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Pass WLT Filing.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

302

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

laMartinPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Elisha Gray Application...

303

Application for presidential permit OE Docket No. PP-299 Sea...  

Broader source: Energy.gov (indexed) [DOE]

at the U.S-Canada border. - Federal Register Notice Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc More...

304

Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation Chapter 52, entitled Air Quality: Permits, Registrations, and Prohibitory Rules, is promulgated under the authority of the Division of Air Quality within the...

305

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Roy Kjendal Application for...

306

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rthernPassIntervention.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Anne Moschella Application for...

307

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

The Department of Energy (DOE) announces its decision to issue a Presidential permit to Champlain Hudson Power Express, Inc. (CHPEI), to construct, operate, maintain, and connect...

308

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

AlicePeatmanComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application...

309

Application for presidential permit OE Docket No. PP-304 Generadora...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-304 Generadora Del Desierto SA DE CV More Documents & Publications...

310

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James...

311

Application for Presidential Permit OE Docket No. PP-257 Emera...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-257 Emera Energy Services, Inc. More Documents & Publications...

312

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

nMoulderPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Michael Marino...

313

Amended Application for Presidential Permit OE Docket No. PP...  

Broader source: Energy.gov (indexed) [DOE]

Northern Transmission Line has submitted an amended application for a Presidential Permit to construct, operate, maintain and connect an electric transmission line across the...

314

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

KeenanComments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder Application for...

315

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

Canada Border. Update to Presidential Permit Letter. CHPE-USDOE-Amendment.pdf More Documents & Publications EIS-0447: Final Environmental Impact Statement Application for a...

316

Application for Presidential Permit OE Docket No. PP-334 Baja...  

Broader source: Energy.gov (indexed) [DOE]

transmission facilities at the U.S. - Mexico Border. Application for Presidental Permit OE Docket No. PP-334 Baja Wind Transmission, LLC More Documents & Publications...

317

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

hereby applies to the United States Department of Energy (DOE) for a Presidential Permit authorizing the construction, connection, operation, and maintenance of facilities for...

318

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

rtMartinPP-371Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin...

319

Clark County- Solar and Wind Building Permit Guides  

Broader source: Energy.gov [DOE]

Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

320

File:CDPHE Industrial Individual Wastewater Discharge Permit...  

Open Energy Info (EERE)

Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search File File history File usage Metadata File:CDPHE Industrial Individual Wastewater...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Application for presidential permit OE Docket No. PP-371 Northern...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to...

322

Application for a Colorado State Permit for Achaeological or...  

Open Energy Info (EERE)

Form: Application for a Colorado State Permit for Achaeological or Paleontological Work Abstract This application must be submitted and approved prior to commencing...

323

Appendix F. Permits AnnualSiteEnvironmentalRepor  

E-Print Network [OSTI]

/17/2003 DOE DOE BWXT CAA Depleted Uranium Forming and Heat Transfer (Construction Permit) 950266P 11/4/1998 7

Pennycook, Steve

324

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Broader source: Energy.gov [DOE]

Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

325

Funding Mechanisms for Federal Geothermal Permitting (Presentation)  

SciTech Connect (OSTI)

This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

Witherbee, K.

2014-03-01T23:59:59.000Z

326

WATER POLLUTION CONTROL GENERAL PERMIT GNEV93001  

National Nuclear Security Administration (NNSA)

and permeability limit in force at that time. I.F.3. No waste waters containing petroleum products will be discharged into treatment works without first being processed...

327

Rivanna River Basin Commission (Virginia)  

Broader source: Energy.gov [DOE]

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

328

PROPRIETARY MATERIAL. 2011 The McGraw-Hill Companies, Inc. Limited distribution permitted only to teachers and educators for course preparation. If you are a student using this Manual, you are using it without permission.  

E-Print Network [OSTI]

PROPRIETARY MATERIAL. © 2011 The McGraw-Hill Companies, Inc. Limited distribution permitted only Turbine Boiler Condense r Process heater PIPII 9 2 3 7 4 fwh #12;

Bahrami, Majid

329

Isotope hydrology of catchment basins: lithogenic and cosmogenic isotopic systems  

SciTech Connect (OSTI)

A variety of physical processes affect solute concentrations within catchment waters. The isotopic compositions of the solutes can indicate which processes have determined the observed concentrations. These processes together constitute the physical history of the water. Many solutes in natural waters are derived from the interaction between the water and the rock and/or soil within the system - these are termed `lithogenic` solutes. The isotopic compositions of these solutes provide information regarding rock-water interactions. Many other solutes have their isotopic compositions determined both within and outside of the catchment - i.e., in addition to being derived from catchment rock and soil, they are solutes that are also transported into the catchment. Important members of this group include solutes that have isotopic compositions produced by atomic particle interactions with other nuclides. The source of the atomic particles can be cosmic radiation (producing `cosmogenic` nuclides in the atmosphere and land surface), anthropogenic nuclear reactions (producing `thermonuclear` nuclides), or radioactive and fission decay of naturally-occurring elements, principally {sup 238}U (producing `in-situ` lithogenic nuclides in the deep subsurface). Current language usage often combines all of the atomic particle-produced nuclides under the heading `cosmogenic nuclides`, and for simplicity we will often follow that usage here, although always indicating which variety is being discussed. This paper addresses the processes that affect the lithogenic and cosmogenic solute concentrations in catchment waters, and how the isotopic compositions of the solutes can be used in integrative ways to identify these processes, thereby revealing the physical history of the water within a catchment system. The concept of a `system` is important in catchment hydrology. A catchment is the smallest landscape unit that can both participate in all of the aspects of the hydrologic cycle and also be treated as a mostly closed system for mass balance considerations. It is the near closure of the system that permits well- constrained chemical mass balance calculations to be made. These calculations generally focus of lithogenic solutes, and therefore in our discussions of lithogenic nuclides in the paper, the concept of chemical mass balance in a nearly dosed system will play an important role. Examination of the isotopic compositions of solutes provides a better understanding of the variety of processes controlling mass balance. It is with this approach that we examined the variety of processes occurring within the catchment system, such as weathering and soil production, generation of stormflow and streamflow (hydrograph separation), movement of soil pore water, groundwater flow, and the overall processes involved with basinal water balance. In this paper, the term `nuclide` will be used when referring to a nuclear species that contains a particular number of protons and neutrons. The term is not specific to any element. The term `isotope` will be used to distinguish nuclear species of a given element (atoms with the same number of protons). That is to say, there are many nuclides in nature - for example, {sup 36}Cl, {sup 87}Sr, {sup 238}U; the element has four naturally-occurring isotopes - {sup 87}Sr, and {sup 88}Sr. This paper will first discuss the general principles that underlie the study of lithogenic and cosmogenic nuclides in hydrology, and provide references to some of the more important studies applying these principles and nuclides. We then turn in the second section to a discussion of their specific applications in catchment- scale systems. The final section of this paper discusses new directions in the application of lithogenic and cosmogenic nuclides to catchment hydrology, with some thoughts concerning possible applications that still remain unexplored.

Nimz, G. J., LLNL

1998-06-01T23:59:59.000Z

330

Hanford K-Basin Sludge Characterization Overview February 2005  

E-Print Network [OSTI]

irradiated fuel prior to Spent Nuclear Fuel (SNF) processing. In 1980, irradiated N-Reactor fuel was placed products and uranium. This sludge must be removed and disposed as part of the basin decommissioning) and the definition of High Level Waste (HLW) and Spent Nuclear Fuel (SNF) from the Nuclear Waste Policy Act of 1982

331

Processing Poultry at Home.  

E-Print Network [OSTI]

TDOC Z TA245.7 8873 N0.1383 - - 5 B-1383 Processing Poultry at Home The Texas A&M University System Texas Agricultural Extension Service Zerle L. Carpenter , Director College Station CONTENTS Facilities and Equipment... ................................................. 9 Skinning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 0-11 Federal and state laws require inspection of poultry processed for sale. Producers are permitted to process their own...

Denton, James H.; Mellor, David B.

1983-01-01T23:59:59.000Z

332

Linearly Exchangable Permits for the Efficient Control of Multiple Pollutants  

E-Print Network [OSTI]

PWP-019 Linearly Exchangable Permits for the Efficient Control of Multiple Pollutants James B;Linear Exchangeable Permits for the Ecient Control of Multiple Pollutants James B. Bushnell University of pollutants. Often a new polluter is required to purchase an "o-set" from an existing polluter prepared

California at Berkeley. University of

333

car_app1.doc STAFF PARKING PERMIT APPLICATION  

E-Print Network [OSTI]

and drop off points Frequency of lifts (days per week) 6. Car Sharing You can share a group permit with upcar_app1.doc STAFF PARKING PERMIT APPLICATION The information supplied on this form will allow (whichever is quicker) from campus to home? (Departing campus at 1700 hours) #12;car_app1.doc 4. Staff

Haase, Markus

334

New Passwords in the Visa and Work Permit Game: A Review of the New Visa and Work Permit Regulatory Framework in Taiwan  

E-Print Network [OSTI]

art. 8(3). VISAS AND WORK PERMITS IN TAIWAN F. PENALTIES ANDVisas and Work Permits 1. OverseasPASSWORDS IN THE VISA AND WORK PERMIT GAME: A REVIEW OF THE

Winkler, Robin; Lee, Robert; Ruff, Andrew

1993-01-01T23:59:59.000Z

335

Tradable Permits with Incomplete Monitoring: Evidence from Santiago’s Particulate Permits Program  

E-Print Network [OSTI]

1980s. The TSP trading program, established in March of 1992, was designed to curb TSP emissions from the largest stationary sources in Santiago (industrial boilers, industrial ovens, and large residential and commercial heaters) whose emissions... to trade permits only on an annual or permanent basis.22 4.2 The data The data for the study were obtained from PROCEFF’s databases for the years 1993 through 1999.23 Each database includes information on the number of sources and their dates of regis...

Montero, Juan-Pablo

2006-03-14T23:59:59.000Z

336

Gas Generation from K East Basin Sludges - Series II Testing  

SciTech Connect (OSTI)

This report describes work to examine the gas generation behavior of actual K East (KE) Basin floor, pit and canister sludge. Mixed and unmixed and fractionated KE canister sludge were tested, along with floor and pit sludges from areas in the KE Basin not previously sampled. The first report in this series focused on gas generation from KE floor and canister sludge collected using a consolidated sampling technique. The third report will present results of gas generation testing of irradiated uranium fuel fragments with and without sludge addition. The path forward for management of the K Basin Sludge is to retrieve, ship, and store the sludge at T Plant until final processing at some future date. Gas generation will impact the designs and costs of systems associated with retrieval, transportation and storage of sludge.

Bryan, Samuel A.; Delegard, Calvin H.; Schmidt, Andrew J.; Sell, Rachel L.; Silvers, Kurt L.; Gano, Susan R.; Thornton, Brenda M.

2001-03-14T23:59:59.000Z

337

Hanford facility dangerous waste permit application, general information portion. Revision 3  

SciTech Connect (OSTI)

For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

Sonnichsen, J.C.

1997-08-21T23:59:59.000Z

338

The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices  

SciTech Connect (OSTI)

Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

Copping, Andrea E.; Geerlofs, Simon H.; Hanna, Luke A.

2014-06-30T23:59:59.000Z

339

The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices  

SciTech Connect (OSTI)

Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

Copping, Andrea E.; Geerlofs, Simon H.; Hanna, Luke A.

2013-09-30T23:59:59.000Z

340

FY2004 CORROSION SURVEILLANCE RESULTS FOR L-BASIN  

SciTech Connect (OSTI)

This report documents the results of the L-Basin Corrosion Surveillance Program for the fiscal year 2004. Test coupons were removed from the basin on February 12, 2004, shipped to Savannah River National Laboratory (SRNL), and visually examined in a contaminated laboratory hood. Selected coupons were metallurgically characterized to establish the extent of general corrosion and pitting. Pitting was observed on galvanically coupled and on intentionally creviced coupons, thus demonstrating that localized concentration cells were formed during the exposure period. In these cases, the susceptibility to pitting was not attributed to aggressive basin water chemistry but to localized conditions (intentional crevices and galvanic coupling) that allowed the development of oxygen and/or metal ion concentration cells that produced locally aggressive waters. General oxidation was also observed on all of the coupons with localized corrosion observed on some of the coupons. These coupons were not pretreated to produce a protective oxide layer prior to exposure in the basin water. Non-protected coupons are more susceptible to corrosion than fuel cladding which has developed a protective oxide layer from high temperature reactor operations. However, the oxide on spent nuclear fuel (SNF) stored in L-Basin is not necessarily in pristine condition. Some of the oxide may have spalled off or been mechanically damaged prior to arrival at SRS. These areas on the fuel cladding would have the same susceptibility to corrosion as the coupons. Current observations from the test coupons demonstrate that, even with rigorously controlled basin water chemistry, localized aggressive conditions can develop in intentional crevice and galvanic samples. These results do illustrate the potential for corrosion induced degradation and thus the importance of a routine surveillance program similar to that conducted on the Uruguay fuel and on the surveillance coupons stored in L-Basin and future in-service inspections proposed for additional SNF in L-Basin. The 2004 results are compared to previous results on coupons removed from SRS basins in fiscal years 2001, 2002 and 2003. The extent of corrosion is correlated with sample and storage conditions as well as the water chemistry during the storage period. Coupon weight gains from 2004 coupons are similar to those from 2003. Oxides were removed from furniture rack coupons from 2003 and 2004 and comparable pit depths were found in the filler metal. Corrosion induced-degradation of the spent nuclear fuels stored in L-Basin could potentially impact the storage process by causing cladding penetration, exposing fuel core material, and allowing release of radionuclides to the basin waters. Such releases could potentially lead to high water activity levels which could impact fuel integrity and present problems in future fuel handling and transfer operations. However, the collective results (to date) of the coupon and water chemistry evaluations and Uruguay spent fuel inspections indicate that the fuel in the SRS storage basins has not experienced corrosion-induced degradation that will limit the time for interim storage in the basin waters. Continued surveillance and inspection is essential due to the potential for corrosion induced degradation. The next withdrawal of surveillance coupons from L-Basin occurred on March 29, 2005.

VORMELKER, P

2005-09-05T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

PERMIT FOR WELDING AND CUTTING OPERATIONS INSTRUCTIONS: This permit must be completed for all operations involving open  

E-Print Network [OSTI]

PERMIT FOR WELDING AND CUTTING OPERATIONS INSTRUCTIONS: This permit must be completed for all/Area: Description of Work to be Performed: (check where appropriate) Welding Cutting Soldering Burning Type OF ACCIDENTAL FIRES DUE TO WELDING OR CUTTING OPERATIONS 1: Do not perform cutting or welding work where an open

Papautsky, Ian

342

Evaluation of injection well risk management potential in the Williston Basin  

SciTech Connect (OSTI)

The UIC regulations promulgated by the EPA under the Safe Drinking Water Act (SDWA) provide the EPA, or an EPA approved state agency, with authority to regulate subsurface injection of fluids to protect USDWs. Oil and gas producing industry interests are concerned primarily with Class 2 wells whose uses as defined by UIC regulations are: disposal of fluids brought to the surface and liquids generated in connection with oil and gas production (SWD); injection of fluids for enhanced oil recovery (EOR); and storage of liquid hydrocarbons. The Williston Basin was chosen for the pilot study of the feasibility of using the risk approach in managing Class 2 injection operations for the following reasons: it is one of the nine geologic basins which was classified as having a significant potential for external casing corrosion, which permitted an evaluation of the effectiveness of the injection well corrosion control measures used by industry; there are 731 active, 22 shut in and 203 temporarily abandoned SWD and water injection wells in the basin; and the basin covers three states. The broad objective of the Williston Basin study is to define requirements and to investigate the feasibility of incorporating risk management into administration of the UIC program. The study does not address the reporting aspects of UIC regulatory and compliance activities but the data base does contain essentially all the information required to develop the reports needed to monitor those activities. 16 refs., 10 figs., 11 tabs.

none,

1989-09-01T23:59:59.000Z

343

Experience in automating the Title V permit application  

SciTech Connect (OSTI)

Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

Ashcraft, T. [Warren Petroleum Co., Tulsa, OK (United States); O`Brien, J. [Process Data Control Corp., Dallas, TX (United States)

1995-12-31T23:59:59.000Z

344

Delaware River Basin Commission (Multiple States)  

Broader source: Energy.gov [DOE]

The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states...

345

Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)  

SciTech Connect (OSTI)

This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10`` to 20`` API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

Olsen, D.K.; Johnson, W.I.

1993-05-01T23:59:59.000Z

346

Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)  

SciTech Connect (OSTI)

This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10'' to 20'' API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

Olsen, D.K.; Johnson, W.I.

1993-05-01T23:59:59.000Z

347

Supplementary information on K-Basin sludges  

SciTech Connect (OSTI)

Three previous documents in this series have been published covering the analysis of: K East Basin Floor and Pit Sludge, K East Basin Canister Sludge, and K West Basin Canister Sludge. Since their publication, additional data have been acquired and analyses performed. It is the purpose of this volume to summarize the additional insights gained in the interim time period.

MAKENAS, B.J.

1999-03-15T23:59:59.000Z

348

Atlas of the Columbia River Basin  

E-Print Network [OSTI]

#12;Atlas of the Columbia River Basin Oregon State University Computer-Assisted Cartography Course & GEOVISUALIZATION GROUP UNIVERSITY #12;2013 Oregon State University Atlas of the Columbia River Basin FOREWORDAtlas, Montana, Nevada, Wyoming, and Utah. 2013 Oregon State University Atlas of the Columbia River Basin

Jenny, Bernhard

349

LAND USE AND OWNERSHIP, WILLISTON BASIN  

E-Print Network [OSTI]

Chapter WM LAND USE AND OWNERSHIP, WILLISTON BASIN By T.T. Taber and S.A. Kinney In U.S. Geological........................................WM-1 Map Information for the Williston Basin Land Use And Land Cover Map.........................................................WM-2 Map Information for the Williston Basin Subsurface Ownership map

350

RRC - Supplemental Application Information for Permit to Maintain...  

Open Energy Info (EERE)

Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit Jump to: navigation, search OpenEI Reference LibraryAdd to library...

351

U-144:Juniper Secure Access Input Validation Flaw Permits Cross...  

Broader source: Energy.gov (indexed) [DOE]

The vendor has issued a fix (7.0R9, 7.1R). Addthis Related Articles V-193: Barracuda SSL VPN Input Validation Hole Permits Cross-Site Scripting Attacks T-701: Citrix Access...

352

Microsoft Word - Final Class 2 Permit Modification Request TRUPACT...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PMR Permit Modification Request SLB2 standard large box 2 SWB standard waste box TDOP ten-drum overpack TRU transuranic WHB Waste Handling Building WIPP Waste Isolation Pilot...

353

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Energy Savers [EERE]

Register Notice, Volume 79, No. 165, August 26, 2014 Application for Presidential Permit OE Docket No. PP-400 TDI-NE New England Clean Power Link Project: Notice of Intent to...

354

Application for presidential permit OE Docket No. PP-304 Generadora...  

Broader source: Energy.gov (indexed) [DOE]

del Desierto SAde C.V. Western Area Power Administration Application for presidential permit OE Docket No. PP-304 Generadora Del Desierto SA DE CV EIS-0395: Record of Decision and...

355

Idaho Application for Permit to Convert a Geothermal Injection...  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Application for Permit to Convert a Geothermal Injection Well - Form 4003-3 Form Type ApplicationNotice Form...

356

City of Philadelphia- Streamlined Solar Permitting and Fee Reduction  

Broader source: Energy.gov [DOE]

Photovoltaic systems of 10 kW or less installed on 1- or 2-family residential units are eligible for streamlined permitting and a fee reduction. PV projects can use a [http://www.phila.gov/green...

357

Application for presidential permit OE Docket No. PP-234 Baja...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications PP-234 Baja California Power Inc Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC PP-234-1 Baja California Power...

358

NMDOT Application for Permit to Construct an Access or Median...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Construct an Access or Median Opening on Public Right of WayLegal Published NA...

359

Idaho Application for Permit to Construct Modify or Maintain...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- RegulationRegulation: Idaho Application for Permit to Construct Modify or Maintain an Injection Well - Form 42-39-1Legal Published NA...

360

Application for presidential permit OE Docket No. PP-334 Energia...  

Broader source: Energy.gov (indexed) [DOE]

Juarex U.S Transmission LLC More Documents & Publications Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC: Notice of Intent To...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Application for Presidential Permit OE Docket No. PP-396 Emera...  

Broader source: Energy.gov (indexed) [DOE]

PP-396 Emera Maine FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81 - April...

362

AZPDES General Permit for Stormwater Discharges Associated with...  

Open Energy Info (EERE)

Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

363

On-Site Wastewater Treatment Systems: Selecting and Permitting  

E-Print Network [OSTI]

This publication explains factors to consider when choosing an on-site wastewater treatment system and lists the nine steps required to obtain a permit for one. It includes addresses and phone numbers of Texas Natural Resource Conservation...

Lesikar, Bruce J.

2005-04-30T23:59:59.000Z

364

State Waste Discharge Permit application: 400 Area Septic System  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affects groundwater or has the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 400 Area Septic System. The influent to the system is domestic waste water. Although the 400 Area Septic System is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. Therefore, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used.

Not Available

1994-06-01T23:59:59.000Z

365

Hawaii Application for Surface Water Use Permit for Proposed...  

Open Energy Info (EERE)

Use Permit for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Hawaii...

366

Subsistence Halibut Special Permits Application Page 1 of 8  

E-Print Network [OSTI]

___________________________________ BLOCK B -- SUBSISTENCE HALIBUT COMMUNITY HARVEST (CHP) PERMIT NOTE: Attach any previously issued CHP harvest logs 1. Name of Alaska Native Tribe or Community 2. Name of CHP Coordinator (First, Middle, Last

367

Emissions Trading with Profit-Neutral Permit Allocations  

E-Print Network [OSTI]

This paper examines the impact of an emissions trading scheme (ETS) on equilibrium emissions, output, price, market concentration, and profits in a generalized Cournot model. We develop formulae for the number of emissions permits that have...

Hepburn, Cameron J.; Quah, John K.-H.; Ritz, Robert A.

2012-08-17T23:59:59.000Z

368

Wetlands Standard Dredge and Fill Permit (New Hampshire)  

Broader source: Energy.gov [DOE]

The purpose of the permits is to protect and preserve submerged lands under tidal and freshwaters and wetlands, both salt and fresh water, from unregulated alteration that would adversely affect...

369

City of Riverhead- Energy Conservation Device Permitting Fees  

Broader source: Energy.gov [DOE]

In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on...

370

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements  

SciTech Connect (OSTI)

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

French, Sean B [Los Alamos National Laboratory; Johns - Hughes, Kathryn W [Los Alamos National Laboratory

2011-01-21T23:59:59.000Z

371

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

372

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

373

Hanford facility dangerous waste permit application, PUREX storage tunnels  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997.

Price, S.M.

1997-09-08T23:59:59.000Z

374

File:06 - ConstructionPermitsOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfaConstructionPermitsOverview.pdf Jump to: navigation,

375

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full. Also, an associative list processing unit and method comprising employing a plurality of prioritized cell blocks and using a tree of prioritized multiplexers descending from the plurality of cell blocks.

Hemmert, Karl Scott; Underwood, Keith D.

2013-01-29T23:59:59.000Z

376

NILE BASIN INITIATIVE Claire Stodola  

E-Print Network [OSTI]

· Climate Change #12;Upstream states · Low water needs Downstream states · High water needs #12;Historical #12;Research Question How has the Nile Basin Initiative influenced the riparian states' management states 1959 ­ Still only BILATERAL 1960s to 1990s - Increasing frustration by upstream states #12;What

New Hampshire, University of

377

GOLF COURSES FRASER RIVER BASIN  

E-Print Network [OSTI]

practices (BMP's) for golf courses, entitled Greening your BC Golf Course. A Guide to Environmental. It also summarizes conditions and practices in the Fraser Basin, reviews best management practices.C. Prepared by: UMA ENVIRONMENTAL A Division of UMA Engineering Ltd. Burnaby, B.C. March 1996 #12;THIRD PARTY

378

Application for Approval of Modification for the 105-KE Basin Encapsulation Activity  

SciTech Connect (OSTI)

This application is being submitted to US EPA pursuant to Title 40, Code of Federal Regulations, Part 61.07, amended. The encapsulation activity will consist of the activities necessary to complete encapsulation of the fuel elements and sludge in 105-KE basin, a storage basin for irradiated N Reactor fuel in Hanford 100-K Area; it currently stores 1,150 MTU of N Reactor irradiated fuel elements transferred to the basin from 1975 through 1989. The application presents the chemical and physical processes relating to the encapsulation activity, source term, expected annual emissions, radionuclide control and monitoring equipment, and projected dose to the maximally exposed individual.

Not Available

1993-03-01T23:59:59.000Z

379

The Design of an Emissions Permit Market for RECLAIM: A Holistic Approach  

E-Print Network [OSTI]

note 7, at 31. EMISSIONS PERMIT MARKET DESIGN uities maya transferable discharge permit * M.S.E.H.S. ( EnvironmentalTransferable Dis- charge Permits for Control of BOD: An

Goldenberg, Evan

1993-01-01T23:59:59.000Z

380

University Food Permit For Serving Food or Refreshments on University Property  

E-Print Network [OSTI]

University Food Permit For Serving Food or Refreshments on University Property Not Required__________________________________________ Date ___________________ When applicable, this permit must be reviewed by the Environmental Hygiene only) #12;Caterer/Restaurant/ Market ADDITIONAL FOOD SOURCES: University Food Permit (Page 2) Foods

Amin, S. Massoud

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Rocky Mountain Basins Produced Water Database  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Historical records for produced water data were collected from multiple sources, including Amoco, British Petroleum, Anadarko Petroleum Corporation, United States Geological Survey (USGS), Wyoming Oil and Gas Commission (WOGC), Denver Earth Resources Library (DERL), Bill Barrett Corporation, Stone Energy, and other operators. In addition, 86 new samples were collected during the summers of 2003 and 2004 from the following areas: Waltman-Cave Gulch, Pinedale, Tablerock and Wild Rose. Samples were tested for standard seven component "Stiff analyses", and strontium and oxygen isotopes. 16,035 analyses were winnowed to 8028 unique records for 3276 wells after a data screening process was completed. [Copied from the Readme document in the zipped file available at http://www.netl.doe.gov/technologies/oil-gas/Software/database.html] Save the Zipped file to your PC. When opened, it will contain four versions of the database: ACCESS, EXCEL, DBF, and CSV formats. The information consists of detailed water analyses from basins in the Rocky Mountain region.

382

Improved Recovery Demonstration for Williston Basin Carbonates  

SciTech Connect (OSTI)

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in- place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing 3-dimensional (3-D) and multi- component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with short- lateral and horizontal drilling technologies. Improved completion efficiency, additional wells at closer spacing and better estimate of oil-in-place will result in additional oil production by primary and enhanced recovery processes.

NONE

1997-03-01T23:59:59.000Z

383

Improved Recovery Demonstration for Williston Basin Carbonates  

SciTech Connect (OSTI)

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in-place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing three-dimensional is being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with short-lateral and horizontal drilling technologies. Improved completion efficiency, additional wells at closer spacing and better estimates of oil-in-place will result in additional oil production by primary and enhanced recovery processes.

Larry A. Carrell

1997-12-31T23:59:59.000Z

384

Improved Recovery Demonstration for Williston Basin Carbonates.  

SciTech Connect (OSTI)

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in- place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing 3-dimensional (3-D) and multi-component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with short-lateral and horizontal drilling technologies. Improved completion efficiency, additional wells at closer spacing and better estimate of oil-in-place will result in additional oil production by primary and enhanced recovery processes.

NONE

1997-12-31T23:59:59.000Z

385

Improved recovery demonstration for Williston Basin carbonates  

SciTech Connect (OSTI)

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in- place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing 3-dimensional (3D) and multi- component seismic are being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with short- lateral and horizontal drilling technologies. Improved completion efficiency, additional wells at closer spacing and better estimates of oil-in-place will result in additional oil production by primary and enhanced recovery processes.

Carrell, L. A., Luff Exploration Co., Denver, CO

1996-09-01T23:59:59.000Z

386

Improved recovery demonstration for Williston Basin carbonates  

SciTech Connect (OSTI)

The purpose of this project is to demonstrate targeted infill and extension drilling opportunities, better determination of oil-in-place, methods for improved completion efficiency and the suitability of waterflooding in certain shallow-shelf carbonate reservoirs in the Williston Basin, Montana, North Dakota and South Dakota. Improved reservoir characterization utilizing 3-dimensional (3D) is being investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterization tools are integrated with geological and engineering studies. Improved completion efficiency is being tested with short lateral and horizontal drilling technologies. Improved completion efficiency, additional wells at closer spacing and better estimates of oil-in- place will result in additional oil production by primary and enhanced recovery processes.

Carrell, L. A., Luff Exploration Co., Denver, CO

1997-12-01T23:59:59.000Z

387

SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499  

SciTech Connect (OSTI)

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

Langton, C.; Serrato, M.; Blankenship, J.; Griffin, W.

2010-01-04T23:59:59.000Z

388

Sedimentary basin geochemistry and fluid/rock interactions workshop  

SciTech Connect (OSTI)

Fundamental research related to organic geochemistry, fluid-rock interactions, and the processes by which fluids migrate through basins has long been a part of the U.S. Department of Energy Geosciences program. Objectives of this program were to emphasize those principles and processes which would be applicable to a wide range of problems associated with petroleum discovery, occurrence and extraction, waste disposal of all kinds, and environmental management. To gain a better understanding of the progress being made in understanding basinal fluids, their geochemistry and movement, and related research, and to enhance communication and interaction between principal investigators and DOE and other Federal program managers interested in this topic, this workshop was organized by the School of Geology and Geophysics and held in Norman, Oklahoma in November, 1991.

NONE

1991-12-31T23:59:59.000Z

389

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

390

Application for a Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

canada Border. Amendment to Presidential Permit Application Letter. LetterPermitAmendmentof28Feb12.pdf More Documents & Publications EIS-0447: Amended Notice of Intent to...

391

Application for Presidential Permit OE Docket No. PP-399 MATL LLP  

Broader source: Energy.gov [DOE]

Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission facilities.

392

Application for Presidential Permit OE Doc. No. PP-399 MATL LLP...  

Broader source: Energy.gov (indexed) [DOE]

Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission facilities. Federal Register...

393

Geology of interior cratonic sag basins  

SciTech Connect (OSTI)

Interior cratonic sag basins are thick accumulations of sediment, generally more or less oval in shape, located entirely in the interiors of continental masses. Some are single-cycle basins and others are characterized by repeated sag cycles or are complex polyhistory basins. Many appear to have developed over ancient rift systems. Interior cratonic sag basins are typified by a dominance of flexural over fault-controlled subsidence, and a low ratio of sediment volume to surface area of the basin. The Baltic, Carpentaria, Illinois, Michigan, Parana, Paris, and Williston basins are examples of interior cratonic sag basins. Tectonics played a dominant role in controlling the shapes and the geometries of the juxtaposed packets of sedimentary sequences. While the mechanics of tectonic control are not clear, evidence suggests that the movements are apparently related to convergence of lithospheric plates and collision and breakup of continents. Whatever the cause, tectonic movements controlled the freeboard of continents, altering base level and initiating new tectono-sedimentologic regimes. Sag basins situated in low latitudes during their development commonly were sites of thick carbonates (e.g., Illinois, Michigan, Williston, and Paris basins). In contrast, siliciclastic sedimentation characterized basins that formed in higher latitudes (e.g., Parana and Carpentaria basins). Highly productive sag basins are characterized by widespread, mature, organic-rich source rocks, large structures, and good seals. Nonproductive basins have one or more of the following characteristics: immature source rocks, leaky plumbing, freshwater flushing, and/or complex geology due to numerous intrusions that inhibit mapping of plays.

Leighton, M.W.; Eidel, J.J.; Kolata, D.R.; Oltz, D.F. (Illinois Geological Survey, Champaign (USA))

1990-05-01T23:59:59.000Z

394

State Waste Discharge Permit application: 200-E Powerhouse Ash Pit  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

395

State Waste Discharge Permit application: 200-W Powerhouse Ash Pit  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

396

Hanford facility dangerous waste permit application, general information portion  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

Hays, C.B.

1998-05-19T23:59:59.000Z

397

CLEAR LAKE BASIN 2000 PROJECT  

SciTech Connect (OSTI)

The following is a final report for the Clear Lake Basin 2000 project. All of the major project construction work was complete and this phase generally included final details and testing. Most of the work was electrical. Erosion control activities were underway to prepare for the rainy season. System testing including pump stations, electrical and computer control systems was conducted. Most of the project focus from November onward was completing punch list items.

LAKE COUNTY SANITATION DISTRICT

2003-03-31T23:59:59.000Z

398

F-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1  

SciTech Connect (OSTI)

During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the second half of 1993, notably aluminum, iodine-129, and zinc. The elevated constituents are found primarily in Aquifer Zone 2B{sub 2} and Aquifer Zone 2B{sub 1} wells. However, several Aquifer Unit 2A wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Water-level maps indicate that the groundwater flow rates and directions at the FASB have remained relatively constant since the basins ceased to be active in 1988.

Butler, C.T.

1994-03-01T23:59:59.000Z

399

File:06AKCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfaConstructionPermitsOverview.pdf JumpInformationsource

400

The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector  

E-Print Network [OSTI]

. carbon permit values are large and almost offset the welfare losses; 5. carbon permit price implicationsThe Impacts of Carbon Permit Prices on the U.S. Agricultural Sector Prepared by: Bruce Mc Washington, D.C. April 1999 #12;ICF 1 The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector

McCarl, Bruce A.

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY  

E-Print Network [OSTI]

Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY (657 CHAIR/ DIRECTOR NAME CSUF EMAIL ADDRESS DAY PHONE # DEPARTMENT Individual Special Permit Department "Shared Use" Special Permit Please provide a written explanation of the purpose for the Special Use Permit

de Lijser, Peter

402

January 18, 2001 Welfare Gains under Tradable CO2 Permits*  

E-Print Network [OSTI]

emissions, together with changes in inputs such as capital and labor. We can use this data to estimate and policymakers have proposed establishing tradable carbon permits to decrease the cost of reducing global carbon it relatively straightforward to estimate supply and demand curves that can be used to study the effects

Karp, Larry S.

403

Regulatory Guidance Letter 88-06 SUBJECT: Nationwide Permit Guidance  

E-Print Network [OSTI]

-casting of material that occurs with normal construction practice provided the best management practices at 330.S. The discharge is further limited by 33 CFR 330.6, best management practices, which require the minimization the outfall has an NPDES permit. Section 405 of the Water Quality Act of 1987 exempts storm water outfalls

US Army Corps of Engineers

404

Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)  

SciTech Connect (OSTI)

The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

Young, K. R.; Levine, A.

2014-09-01T23:59:59.000Z

405

The Initial Allocation of Carbon Permits: Choices and Implications  

E-Print Network [OSTI]

tax doesn't mean large government. #12;Percent of Consumption Expenditures by Region and Income Range&D spillovers, not to correct the emission externality. #12;Handing out permits is like a government-enforced cartel to restrict quantity, in order to raise price. Quantity of coal-fired electricity Price Marginal

406

State Waste Discharge Permit application, 183-N Backwash Discharge Pond  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

Not Available

1994-06-01T23:59:59.000Z

407

Hazardous Waste Facility Permit Public Comments to Community...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 SECTION COMMENT POST? 2.0 & 4.0 1. Fix broken links on pages 3 and 4 for the HWA permit. Yes 2.0 2. Revise a sentence on page 4 to: "Limits on LANL waste facilities may be...

408

The use of transferable permits in transport policy Charles Raux  

E-Print Network [OSTI]

geographical areas, and schemes applied to automakers for unitary vehicle emissions are also viable. Keywords), and the rapidly growing use of older in developing countries is a major source of air pollution in urbanized areas) on regulating water use, and the formalization of pollution permit markets by Montgomery (1972). According

Boyer, Edmond

409

File:05HIADrillingAndModificationOfWellsForInjectionUsePermit (1).pdf |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdfa - DrillingPreApplicationProcess.pdfsource HistoryOpen

410

Transient hydrodynamics within intercratonic sedimentary basins during glacial cycles  

E-Print Network [OSTI]

ka B.P.), such as the Williston, Michigan, and Illinois basins. We show that in such basins fluid of the Williston and Alberta basins. Under such con- ditions fluid fluxes in aquifers can be expected

Bense, Victor

411

Problems of phytostratigraphy and the correlation of the Lower Jurassic continental sediments in West Siberia and Kuznetsk and Kansk-Achinsk basins  

SciTech Connect (OSTI)

Paleofloral and palynological records of Lower Jurassic sediments in West Siberia, Kuznetsk (Kuzbass), and Kansk-Achinsk basins and their correlation are discussed. In a number of recent papers dedicated to the Jurassic stratigraphy of Siberia this problem is ambiguously treated. The reference palynological scale has been developed for the Jurassic West Siberian sediments and an uninterrupted succession of floral assemblages associated with it and with regional stratigraphic units has been recognized. On this basis the scheme of the correlation between the Lower Jurassic sediments of the Kansk-Achinsk and Kuznetsk basins and West Siberia permitting a better age estimate of coal-bearing deposits, is proposed.

Mogutcheva, N.K. [Siberian Research Institute of Geology, Geophysics & Mineral Resource, Novosibirsk (Russian Federation)

2009-06-15T23:59:59.000Z

412

How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year  

E-Print Network [OSTI]

How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year 15,000 yen the permit on the fender of your bike where it can be seen easily. Application Procedures Bicycle Permit Motorcycle Permit Bicycle Permit Motorcycle Permit Dai-ni Koubaibu Store: Weekdays 10 00 19 00 Nougakubu

Miyashita, Yasushi

413

Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

SciTech Connect (OSTI)

The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

Bloomquist, R.Gordon

1991-10-01T23:59:59.000Z

414

Dissertation Permit Form Revised 09/09 CSE Ph.D. ADVISOR SELECTION AND PRE-DISSERTATION (8999) PERMIT FORM  

E-Print Network [OSTI]

Dissertation Permit Form­ Revised 09/09 CSE Ph.D. ADVISOR SELECTION AND PRE-DISSERTATION (8999) hours, you must have a permanent advisor and have not passed the qualifier. You must complete this form in consultation with your dissertation advisor. Bring the signed form to the Academic Advisor in Computational

Gray, Alexander

415

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. EPA requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard and must consider inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2001-09-28T23:59:59.000Z

416

Timing and Tectonic implications of basin inversion in the Nam Con Son Basin and adjacent areas, southern South China Sea  

E-Print Network [OSTI]

The Nam Con Son (NCS) Basin, located offshore of SE Vietnam, is one of several Tertiary rift basins that formed during initial Eocene(?)-Oligocene rifting. Following cessation of rifting at the end of Oligocene time, these basins were subjected...

Olson, Christopher Charles

2001-01-01T23:59:59.000Z

417

CRAD, Engineering - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System...

418

CRAD, Conduct of Operations - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System May 2004 A...

419

CRAD, Management - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD,...

420

Refraction Survey At Northern Basin & Range Region (Heimgartner...  

Open Energy Info (EERE)

Northern Basin & Range Region (Heimgartner, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Northern Basin &...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Geographic Information System At Northern Basin & Range Region...  

Open Energy Info (EERE)

Activity: Geographic Information System At Northern Basin & Range Region (Nash & Johnson, 2003) Exploration Activity Details Location Northern Basin and Range Geothermal...

422

Geographic Information System At Nw Basin & Range Region (Nash...  

Open Energy Info (EERE)

Geographic Information System At Nw Basin & Range Region (Nash & Johnson, 2003) Exploration Activity Details Location Northwest Basin and Range Geothermal Region Exploration...

423

Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi...  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi, Et Al., 2008) Exploration Activity Details Location Northwest Basin and Range Geothermal Region Exploration...

424

Independent Oversight Review, Hanford K Basin and Cold Vacuum...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

K Basin and Cold Vacuum Drying Facility - August 2012 Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 August 2012 Review of Hanford K...

425

CRAD, Emergency Management - Office of River Protection K Basin...  

Energy Savers [EERE]

CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A...

426

Oil migration pattern in the Sirte Basin  

SciTech Connect (OSTI)

Sirte Basin is an asymmetrical cratonic basin, situated in the north-central part of Libya. It covers an area of over 350,000km{sup 2} and is one of the most prolific oil-producing basins in the world. Sirte Basin is divided into large NW-SE trending sub-parallel platforms and troughs bounded by deep seated syndepositional normal faults. A very unique combination of thick sediments with rich source rocks in the troughs vs. thinner sediments with prolific reservoir rocks on the platforms accounts for the productivity of the basin. Analysis of oil migration pattern in the Sirte Basin will certainly help to discover the remaining reserves, and this can only be achieved if the important parameter of structural configuration of the basin at the time of oil migration is known. The present paper is an attempt to analyse the time of oil migration, to define the structural picture of the 4 Basin during the time of migration and to delineate the most probable connecting routes between the hydrocarbon kitchens and the oil fields.

Roohi, M.; Aburawi, R.M. [Waha Oil Co., Tripoli (Libyan Arab Jamahiriya)

1995-08-01T23:59:59.000Z

427

6, 839877, 2006 Mexico City basin  

E-Print Network [OSTI]

emitters of air pollutants leading to negative health effects and environmental degradation. The rate altitude basin with air pollutant concentrations above the health limits most days of the year. A mesoscale-dimensional wind patterns in25 the basin and found that the sea-breeze transports the polluted air mass up the moun

Boyer, Edmond

428

Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

NONE

1997-05-01T23:59:59.000Z

429

Sediment infill within rift basins: Facies distribution and effects of deformation: Examples from the Kenya and Tanganyika Rifts, East Africa  

SciTech Connect (OSTI)

Oil is known from lacustrine basins of the east African rift. The geology of such basins is complex and different depending on location in the eastern and western branches. The western branch has little volcanism, leading to long-lived basins, such as Lake Tanganyika, whereas a large quantity of volcanics results in the eastern branch characterized by ephemeral basins, as the Baringo-Bogoria basin in Kenya. The Baringo-Bogoria basin is a north-south half graben formed in the middle Pleistocene and presently occupied by the hypersaline Lake Bogoria and the freshwater Lake Baringo. Lake Bogoria is fed by hot springs and ephemeral streams controlled by grid faults bounding the basin to the west. The sedimentary fill is formed by cycles of organic oozes having a good petroleum potential and evaporites. On the other hand, and as a consequence of the grid faults, Lake Baringo is fed by permanent streams bringing into the basin large quantities of terrigenous sediments. Lake Tanganyika is a meromictic lake 1470 m deep and 700 km long, of middle Miocene age. It is subdivided into seven asymmetric half grabens separated by transverse ridges. The sedimentary fill is thick and formed by organic oozes having a very good petroleum potential. In contrast to Bogoria, the lateral distribution of organic matter is characterized by considerable heterogeneity due to the existence of structural blocks or to redepositional processes.

Tiercelin, J.J.; Lezzar, K.E. (Universite de Bretagne Occidentale, Brest (France)); Richert, J.P. (Elf Aquitaine, Pau (France))

1994-07-01T23:59:59.000Z

430

ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights,InformationWind Energy JumpEnergyApplication Process |

431

ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights,InformationWind Energy JumpEnergyApplication Process

432

State Waste Discharge Permit application, 100-N Sewage Lagoon  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

Not Available

1994-06-01T23:59:59.000Z

433

Sewage Treatment Plant (STP) Design/SPDES Permit Modifications Update  

E-Print Network [OSTI]

Permit that was issued on June 9, 2009, which included more stringent water quality based effluent limits (NA) NA 2.3 pH (SU) 5.8-9.0 * 6.5-8.5 5.8-8.5 Total Suspended Solids (mg/l) 20 NA NA 20 Total.1 Temperature (°F) 90 NA NA --- Total Nitrogen, as N (mg/l) 10 NA 10 10 Total Nitrogen (lbs/day) 20 NA NA

Johnson, Peter D.

434

New Mexico Guidelines for Public Notification for Air Quality Permit  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company) Jump to: navigation, searchOhio:MO) JumpPermits

435

Hawaii Guide for Filing Community Noise Permit Applications | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor | Open EnergySectionEnergyInformation Permit

436

Hawaii State Habitat Conservation Plan Permit Brief | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor | OpenOpenInformation Plan Permit Brief Jump

437

Hawaii Underground Injection Control Permit Packet | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor | OpenOpenInformation Plan Permit

438

Hazardous Waste Facility Permit Fact Sheet | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor |InformationNevada:1227118°,HaysvillePermit

439

Hazardous Waste Part A Permit Application | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridorPart A Permit Application Jump to: navigation,

440

Montana Water Quality Permit Application, Nondegradation Authorization, and  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3 Climate Zone Subtype A.InformationGuide WebpagePermit Fees |

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

50 CFR 13 - General Permit Procedures | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskey Flatshydro Homepowering9centuryGeneral Permit

442

RRC - Online Drilling Permit System Login webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColoradosource History View New PagesElectronDrilling Permit

443

File:03UTFEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jump

444

File:04AKBGeophysicalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jumpsource History View New Pages Recent

445

File:04AKCGeothermalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jumpsource History View New Pages

446

File:04HIAExplorationPermit (1).pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jumpsource History

447

Sequence stratigraphy, facies architecture and reservoir distribution, Cretaceous lowstand fan reservoirs, Southern Basin, onshore Trinidad  

SciTech Connect (OSTI)

Thick Albian-Campanian mass-flow sandstones in the Southern Basin Trinidad were deposited within submarine canyons incised into the northern continental slope of South America and as associated down-dip basin-floor lowstand fans. The contemporaneous slope to basin-floor break lay across the Southern Basin area with turbidity current paleoflow being to the northwest. North of this paleo-slope break graded to massive, channelized, high-density turbidite sandstones occur interstratified with shaly overbank and channel abandonment deposits. A progression of depositional sub-environments from proximal through distal lowstand fan can be recognized. All fine and thin upward but can be discriminated by the occurrence of slumps, debris flows and conglomerates, the grain-size and bedding scale of sandstones and the characteristics of low-density turbidites and mudrocks. South of the paleo-slope break mass-flow deposits comprise muddy slumps and debris flows rich in granules and pebbles deposited in slope canyons. During periods of turbidity current by-pass or fan abandonment hemipelagic settling processes predominated. Reservoir distribution maps of these lowstand fans have been constructed utilizing geometric constraints, analogs and paleoslope determinations from oriented core. The interpreted canyon locations and orientations are key to the understanding of reservoir distribution on the basin-floor tract to the north: a vital component in the exploration of the basin.

Sprague, A.R.; Larue, D.K.; Faulkner, B.L. [Exxon Production Research Company, Houston, TX (United States)] [and others

1996-08-01T23:59:59.000Z

448

State Waste Discharge Permit Application: Electric resistance tomography testing  

SciTech Connect (OSTI)

This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

Not Available

1994-04-01T23:59:59.000Z

449

Evaluation of Phytoremediation of Coal Bed Methane Product Water and Waters of Quality Similar to that Associated with Coal Bed Methane Reserves of the Powder River Basin, Montana and Wyoming  

SciTech Connect (OSTI)

U.S. emphasis on domestic energy independence, along with advances in knowledge of vast biogenically sourced coalbed methane reserves at relatively shallow sub-surface depths with the Powder River Basin, has resulted in rapid expansion of the coalbed methane industry in Wyoming and Montana. Techniques have recently been developed which constitute relatively efficient drilling and methane gas recovery and extraction techniques. However, this relatively efficient recovery requires aggressive reduction of hydrostatic pressure within water-saturated coal formations where the methane is trapped. Water removed from the coal formation during pumping is typically moderately saline and sodium-bicarbonate rich, and managed as an industrial waste product. Current approaches to coalbed methane product water management include: surface spreading on rangeland landscapes, managed irrigation of agricultural crop lands, direct discharge to ephermeral channels, permitted discharge of treated and untreated water to perennial streams, evaporation, subsurface injection at either shallow or deep depths. A Department of Energy-National Energy Technology Laboratory funded research award involved the investigation and assessment of: (1) phytoremediation as a water management technique for waste water produced in association with coalbed methane gas extraction; (2) feasibility of commercial-scale, low-impact industrial water treatment technologies for the reduction of salinity and sodicity in coalbed methane gas extraction by-product water; and (3) interactions of coalbed methane extraction by-product water with landscapes, vegetation, and water resources of the Powder River Basin. Prospective, greenhouse studies of salt tolerance and water use potential of indigenous, riparian vegetation species in saline-sodic environments confirmed the hypothesis that species such as Prairie cordgrass, Baltic rush, American bulrush, and Nuttall's alkaligrass will thrive in saline-sodic environments when water supplies sourced from coalbed methane extraction are plentiful. Constructed wetlands, planted to native, salt tolerant species demonstrated potential to utilize substantial volumes of coalbed methane product water, although plant community transitions to mono-culture and limited diversity communities is a likely consequence over time. Additionally, selected, cultured forage quality barley varieties and native plant species such as Quail bush, 4-wing saltbush, and seaside barley are capable of sustainable, high quality livestock forage production, when irrigated with coalbed methane product water sourced from the Powder River Basin. A consequence of long-term plant water use which was enumerated is elevated salinity and sodicity concentrations within soil and shallow alluvial groundwater into which coalbed methane product water might drain. The most significant conclusion of these investigations was the understanding that phytoremediation is not a viable, effective technique for management of coalbed methane product water under the present circumstances of produced water within the Powder River Basin. Phytoremediation is likely an effective approach to sodium and salt removal from salt-impaired sites after product water discharges are discontinued and site reclamation is desired. Coalbed methane product water of the Powder River Basin is most frequently impaired with respect to beneficial use quality by elevated sodicity, a water quality constituent which can cause swelling, slaking, and dispersion of smectite-dominated clay soils, such as commonly occurring within the Powder River Basin. To address this issue, a commercial-scale fluid-bed, cationic resin exchange treatment process and prototype operating treatment plant was developed and beta-tested by Drake Water Technologies under subcontract to this award. Drake Water Technologies secured U.S. Patent No. 7,368,059-B2, 'Method for removal of benevolent cations from contaminated water', a beta Drake Process Unit (DPU) was developed and deployed for operation in the Powder River Basin. First year operatio

James Bauder

2008-09-30T23:59:59.000Z

450

Gas Generation from K East Basin Sludges - Series II Testing  

SciTech Connect (OSTI)

This report describes work to examine the gas generation behavior of actual K East (KE) Basin floor, pit and canister sludge. Mixed and unmixed and fractionated KE canister sludge were tested, along with floor and pit sludges from areas in the KE Basin not previously sampled. The first report in this series focuses on gas generation from KE floor and canister sludge collected using a consolidated sampling technique. The third report presents results of gas generation testing of irradiated uranium fuel fragments with and without sludge addition. The path forward for management of the K Basin Sludge is to retrieve, ship, and store the sludge at T Plant until final processing at some future date. Gas generation will impact the designs and costs of systems associated with retrieval, transportation and storage of sludge. This report was originally published in March 2001. In January 2004, a transcription error was discovered in the value reported for the uranium metal content of KE North Loadout Pit sample FE-3. This revision of the report corrects the U metal content of FE-3 from 0.0013 wt% to 0.013 wt%.

Bryan, Samuel A.; Delegard, Calvin H.; Schmidt, Andrew J.; Sell, Rachel L.; Silvers, Kurt L.; Gano, Susan R.; Thornton, Brenda M.

2004-04-26T23:59:59.000Z

451

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT  

SciTech Connect (OSTI)

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework

none,

2008-03-26T23:59:59.000Z

452

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2003-09-30T23:59:59.000Z

453

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2000-09-28T23:59:59.000Z

454

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2002-09-21T23:59:59.000Z

455

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2005-09-30T23:59:59.000Z

456

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-09-30T23:59:59.000Z

457

Modeling and Risk Assessment of CO{sub 2} Sequestration at the Geologic-basin Scale  

SciTech Connect (OSTI)

Objectives. The overall objective of this proposal was to develop tools for better understanding, modeling and risk assessment of CO{sub 2} permanence in geologic formations at the geologic basin scale. The main motivation was that carbon capture and storage (CCS) will play an important role as a climate change mitigation technology only if it is deployed at scale of gigatonne per year injections over a period of decades. Continuous injection of this magnitude must be understood at the scale of a geologic basin. Specifically, the technical objectives of this project were: (1) to develop mathematical models of capacity and injectivity at the basin scale; (2) to apply quantitative risk assessment methodologies that will inform on CO{sub 2} permanence; (3) to apply the models to geologic basins across the continental United States. These technical objectives go hand-in-hand with the overarching goals of: (1) advancing the science for deployment of CCS at scale; and (2) contributing to training the next generation of scientists and engineers that will implement and deploy CCS in the United States and elsewhere. Methods. The differentiating factor of this proposal was to perform fundamental research on migration and fate of CO{sub 2} and displaced brine at the geologic basin scale. We developed analytical sharp-interface models of the evolution of CO{sub 2} plumes over the duration of injection (decades) and after injection (centuries). We applied the analytical solutions of CO{sub 2} plume migration and pressure evolution to specific geologic basins, to estimate the maximum footprint of the plume, and the maximum injection rate that can be sustained during a certain injection period without fracturing the caprock. These results have led to more accurate capacity estimates, based on fluid flow dynamics, rather than ad hoc assumptions of an overall “efficiency factor.” We also applied risk assessment methodologies to evaluate the uncertainty in our predictions of storage capacity and leakage rates. This was possible because the analytical mathematical models provide ultrafast forward simulation and they contain few parameters. Impact. The project has been enormously successful both in terms of its scientific output (journal publications) as well as impact in the government and industry. The mathematical models and uncertainty quantification methodologies developed here o?er a physically-based approach for estimating capacity and leakage risk at the basin scale. Our approach may also facilitate deployment of CCS by providing the basis for a simpler and more coherent regulatory structure than an “individual-point-of-injection” permitting approach. It may also lead to better science-based policy for post-closure design and transfer of responsibility to the State.

Juanes, Ruben

2013-08-31T23:59:59.000Z

458

Notice of Termination for Authorization under TPDES General Permit  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico:CommunityNorthwest Basin and RangeNorvento USA(TXR150000) |

459

H-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1  

SciTech Connect (OSTI)

During the second half of 1993, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SC1-890-008-989. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning first quarter 1993, the HASB`s Groundwater Protection Standard (GWPS), established in Appendix 3D-A of the cited permit, became the standard for comparison. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constitutents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, technetium-99, and zinc) during the second half of 1993. Elevated constituents were found primarily in Aquifer Zone 2B{sub 2} and in the upper portion of Aquifer Zone 2B{sub 1}. However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone 2B{sub 1} and Aquifer Unit 2A. Isoconcentration/isoactivity maps include in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during the second half of 1993. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.

Butler, C.T.

1994-03-01T23:59:59.000Z

460

South Carolina Surface Water Withdrawal, Permitting Use, and Reporting Act (South Carolina)  

Broader source: Energy.gov [DOE]

Surface water withdrawals exceeding three million gallons during any one month require a permit; a permit will only be granted if the Department of Health and Environmental Control determines that...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

U-212: RSA Authentication Manager Flaws Permit Cross-Site and...  

Energy Savers [EERE]

Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks V-026: RSA Data Protection Manager Bugs Permit Cross-Site...

462

U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection...  

Energy Savers [EERE]

129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and...

463

Environmental permits and approvals plan for high-level waste interim storage, Project W-464  

SciTech Connect (OSTI)

This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

Deffenbaugh, M.L.

1998-05-28T23:59:59.000Z

464

V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks August 28, 2013 -...

465

U-206: WordPress Flaws Permit Cross-Site Scripting, Cross-Site...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

6: WordPress Flaws Permit Cross-Site Scripting, Cross-Site Request Forgery, and Information Disclosure Attacks U-206: WordPress Flaws Permit Cross-Site Scripting, Cross-Site...

466

V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...  

Broader source: Energy.gov (indexed) [DOE]

8: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

467

V-124: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...  

Broader source: Energy.gov (indexed) [DOE]

4: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-124: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks April 2, 2013 - 1:13am Addthis...

468

Regulatory Guidance Letter 96-01 SUBJECT: Use of Nationwide Permit Number 23 for  

E-Print Network [OSTI]

and conditions of nationwide permit 23, will require evaluation under standard permit procedures administration, operation, and maintenance. 3. Maintenance dredging and debris disposal where no new depths modification, suspension, or revocation procedures. Development of local procedures to streamline coordination

US Army Corps of Engineers

469

Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 Mark Person*1  

E-Print Network [OSTI]

: Mount Simon, Illinois Basin, CO2, earthquakes, pressure, brine transport69 #12;Page | 3 1. IntroductionPage | 1 Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 2 3 4 sharp-interface models of CO2 injection were constructed for the Illinois49 Basin in which porosity

Gable, Carl W.

470

K Basins Sludge Treatment Project Phase 1 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiatives Initiatives Through aEnergyLowJoelProcess K Basins

471

New Mexico Archaeological Permits Webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company) Jump to: navigation, searchOhio:MO) JumpPermits Webpage Jump to:

472

Construction and Minor Permit Applications | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) | OpenMinor Permit Applications Jump to: navigation,

473

EPA Class V Permitting Authorities Website | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified as ASHRAEDuvalJustice webpageClass V Permitting

474

Application for Nonpurposeful Eagle Take Permit | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy Information the Army Permit: Engineering Form 4345 Jump

475

Application for Permit to Construct Access Driveway Facilities on Highway  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy Information the Army Permit: Engineering Form 4345 JumpROW |

476

Arizona State Land Department Applications and Permits Website | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy InformationArcata,KoblitzEnergy Information Permits

477

Solar and Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g GrantAtlas (PACA Region - France) JumpBeginnerThin PowerPermitting

478

Solar/Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to:Information Silver PeakSystems JumpPermitting Standards <

479

Property:ExplorationPermitAgency-Drilling | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration Jump to: navigation,ExplorationPermitAgency-Drilling Property Type Page

480

Property:ExplorationPermitAgency-PreDrilling | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration Jump to: navigation,ExplorationPermitAgency-Drilling Property Type

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Alaska Air Permit Program Webpage | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasil JumpAerowattOpen2008District No 3formPermits |Webpage Jump

482

Alaska DEC Water Permit Search | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasil JumpAerowattOpen2008District No 3formPermits |Webpage

483

File:06IDBConstructionStormwaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to: navigation, searchIDBConstructionStormwaterPermit.pdf

484

File:06MTCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to: navigation,EnergyMTCDrinkingWaterPermit.pdf Jump to:

485

File:06NVATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to: navigation,EnergyMTCDrinkingWaterPermit.pdfOpensource

486

File:06NVCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf Jump to: navigation, search

487

File:06ORATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf Jump to: navigation,

488

File:06ORCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic UtilitiesCABConstructionStormWaterProgram.pdf Jump to:NVCDrinkingWaterPermit.pdf Jump

489

File:Permit2012.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf Jump to: navigation, search File FileOriginalPermit2012.pdf

490

Form GWS-45 - Well Permit Application | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vsFlintFlux PowerFootprintOnPermit Application

491

File:03IDCEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37.California:FDCRightOfWayROWAccess (2).pdfIDCEncroachmentPermit.pdf Jump to:

492

File:03MTEEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNAMTEEncroachmentPermit.pdf Jump to: navigation, search File File history File usage

493

H-Area seepage basins groundwater monitoring report. Volume 1, First and second quarters 1995  

SciTech Connect (OSTI)

Groundwater at the H-Area Seepage Basins (HASB) is monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SCl-890-008-989. The monitoring wells network is composed of 130 HSB wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Data from 16 HSL wells are included in this report only to provide additional information for the HASB. Monitoring results are compared to the SCDHEC Groundwater Protection Standard (GWPS), established in Appendix IIID-A of the permit. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, and zinc) during the first half of 1995. Elevated constituents were found primarily in Aquifer Zone IIB and in the upper portion of Aquifer Zone IIB. However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone IIB, and Aquifer Unit IIA.

NONE

1995-09-01T23:59:59.000Z

494

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 2002 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2002. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, they are spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, the Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-07-01T23:59:59.000Z

495

Petroleum potential of the Libyan sedimentary basins  

SciTech Connect (OSTI)

Contrary to prevailing opinion, all Libyan sedimentary basins and the Al-Jabal Al-Akhdar platform contain prolific petroleum accumulations with very high prospectivity. A systematic review of the types of traps and pays in this central part of the southern Mediterranean province reveals great variability in reservoir and source rock characteristics. The reservoir rocks are of almost all geologic ages. The thick source rock sequences also vary in nature and organic content. The organic-rich facies have accumulated in intracratonic and passive margin basins or in marginal seas. Most of the oil discovered thus far in these basins is found in large structural traps. Future discoveries of stratigraphic traps or small structural traps will require intensified efforts and detailed studies using up-to-date multidisciplinary techniques in sedimentary tectonics, biostratigraphic facies analysis, and geochemical prospecting in order to develop a better understanding of these basins, thus improving their prospectivity.

Hammuda, O.S.; Sbeta, A.M.

1988-08-01T23:59:59.000Z

496

Flathead Basin Commission Act of 1983 (Montana)  

Broader source: Energy.gov [DOE]

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

497

River Basins Advisory Commissions (South Carolina)  

Broader source: Energy.gov [DOE]

The Catawba/Wateree and Yadkin/Pee Dee River Basins Advisory Commissions are permanent public bodies jointly established by North and South Carolina. The commissions are responsible for assessing...

498

Progress Update: H4 Basin Concrete Pour  

ScienceCinema (OSTI)

The Recovery Act funded project in the H area basin. A concrete ditch built longer than half a mile to prevent contaminated water from expanding and to reduce the footprint on the environment.

None

2012-06-14T23:59:59.000Z

499

The Uinta Basin Case Robert J. Bayer  

E-Print Network [OSTI]

Overburden Tailings Oil Shale Mining Open Pit Underground Ex situ extraction Ex situ thermal conversion EIS for Oil Sands and Oil Shale Ongoing concerns with Basin-wide air quality Wildlife and wildlife

Utah, University of

500

K-Basins S/RIDS  

SciTech Connect (OSTI)

The Standards/Requirements Identification Document (S/RID) is a list of the Environmental, Safety, and Health (ES{ampersand}H) and Safeguards and Security (SAS) standards/requirements applicable to the K Basins facility.

Watson, D.J.

1997-08-01T23:59:59.000Z