1

GRR/Section 19-CO-h - Denver Basin and Designated Basin Permitting Process  

Open Energy Info (EERE)

9-CO-h - Denver Basin and Designated Basin Permitting Process 9-CO-h - Denver Basin and Designated Basin Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-h - Denver Basin and Designated Basin Permitting Process 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Ground Water Commission Colorado Division of Water Resources Regulations & Policies CRS 37-90-107 Application for Use of Ground Water 2 CCR 410-1 Rules and Regulations for the Management and Control of Designated Ground Water Triggers None specified Click "Edit With Form" above to add content 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf 19COHDenverBasinAndDesignatedBasinPermittingProcess.pdf

2

GRR/Section 19-CO-b - Denver Basin Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-CO-b - Denver Basin Permitting Process GRR/Section 19-CO-b - Denver Basin Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-b - Denver Basin Permitting Process 19COBDenverBasinPermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Regulations & Policies CRS 37-90-103 Underground Water Definitions CRS 37-90-137 Permits to Construct Wells Outside Designated Basins CRS 37-92-302 Application for Water Rights or Change of Such Water Rights 2 CCR 402-6 The Denver Basin Rules Triggers None specified Click "Edit With Form" above to add content 19COBDenverBasinPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

3

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process  

Open Energy Info (EERE)

GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process GRR/Section 19-CO-c - Designated Ground Water Basin Well Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-c - Designated Ground Water Basin Well Permitting Process 19COCDesignatedGroundWaterBasinWellPermit.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Colorado Ground Water Commission Regulations & Policies CRS 37-90-107 CRS 37-90-108 Ground Water Management District Rules 2 CCR 410-1 - Rules and Regulations for the Management and Control of Designated Ground Water Basins Triggers None specified Click "Edit With Form" above to add content 19COCDesignatedGroundWaterBasinWellPermit.pdf 19COCDesignatedGroundWaterBasinWellPermit.pdf

4

Alaska Public Participation in APDES Permitting Process | Open...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska Public Participation in APDES Permitting ProcessPermittingRegulatory...

5

Distributed PV Permitting and Inspection Processes  

Broader source: Energy.gov [DOE]

This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

6

K Basins Sludge Treatment Process | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

K Basins Sludge Treatment Process K Basins Sludge Treatment Process Full Document and Summary Versions are available for download K Basins Sludge Treatment Process Summary - K...

7

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits...  

Broader source: Energy.gov (indexed) [DOE]

0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks...

8

Property:AirQualityPermitProcess | Open Energy Information  

Open Energy Info (EERE)

"AirQualityPermitProcess" Showing 1 page using this property. R RAPIDOverviewGeothermalAir QualityAlaska + The Air Permit process in Alaska is divided into two divisions: Title...

9

EPA Citizens Guide to Hazardous Waste Permitting Process | Open...  

Open Energy Info (EERE)

Citizens Guide to Hazardous Waste Permitting Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA Citizens Guide to Hazardous Waste Permitting...

10

Chapter 38 Hazardous Waste Permitting Process (Kentucky) | Department of  

Broader source: Energy.gov (indexed) [DOE]

8 Hazardous Waste Permitting Process (Kentucky) 8 Hazardous Waste Permitting Process (Kentucky) Chapter 38 Hazardous Waste Permitting Process (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Kentucky Program Type Environmental Regulations Provider Department for Environmental Protection This administrative regulation establishes the general provisions for storage, treatment, recycling, or disposal of hazardous waste. It provides information about permits and specific requirements for containers, tanks,

11

Summary - K Basins Sludge Treatment Process  

Broader source: Energy.gov (indexed) [DOE]

K Basin K Basin DOE is Proces the va at Han subsys oxidati objecti of-fact maturi Eleme Techn The as which seven * M * M * Pr * Pr * As The Ele Site: H roject: K P Report Date: A ited States Why DOE ns Sludge Treatme s constructing ss (STP) for re rious sludge st nford. The STP stems: sludge ion, assay, pac ive of the asse t" appraisal of t ty by first ident ents (CTEs) of t ology Readine What th ssessment team was further div CTEs and the Material Mobiliza Material Transfe rocess Chemis rocess Instrum ssay (TRL=2) To view the full T http://www.em.doe. objective of a Tech ements (CTEs), usin Hanford/ORP K Basins Slud Process/STP August 2007 Departmen K Bas E-EM Did This ent Process Flow D a K Basins Slu trieving, treatin treams stored i P is comprised containerizatio ckaging, and dr ssment was to the project's ov

12

Alaska ADEC Process for Issuing a 401 Waiver of Corps 404 Permits...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska ADEC Process for Issuing a 401 Waiver of Corps 404 PermitsPermitting...

13

K Basin sludge treatment process description  

SciTech Connect (OSTI)

The K East (KE) and K West (KW) fuel storage basins at the 100 K Area of the Hanford Site contain sludge on the floor, in pits, and inside fuel storage canisters. The major sources of the sludge are corrosion of the fuel elements and steel structures in the basin, sand intrusion from outside the buildings, and degradation of the structural concrete that forms the basins. The decision has been made to dispose of this sludge separate from the fuel elements stored in the basins. The sludge will be treated so that it meets Tank Waste Remediation System (TWRS) acceptance criteria and can be sent to one of the double-shell waste tanks. The US Department of Energy, Richland Operations Office accepted a recommendation by Fluor Daniel Hanford, Inc., to chemically treat the sludge. Sludge treatment will be done by dissolving the fuel constituents in nitric acid, separating the insoluble material, adding neutron absorbers for criticality safety, and reacting the solution with caustic to co-precipitate the uranium and plutonium. A truck will transport the resulting slurry to an underground storage tank (most likely tank 241-AW-105). The undissolved solids will be treated to reduce the transuranic (TRU) and content, stabilized in grout, and transferred to the Environmental Restoration Disposal Facility (ERDF) for disposal. This document describes a process for dissolving the sludge to produce waste streams that meet the TWRS acceptance criteria for disposal to an underground waste tank and the ERDF acceptance criteria for disposal of solid waste. The process described is based on a series of engineering studies and laboratory tests outlined in the testing strategy document (Flament 1998).

Westra, A.G.

1998-08-28T23:59:59.000Z

14

GRR/Section 18-ID-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-ID-b - Hazardous Waste Permit Process GRR/Section 18-ID-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-ID-b - Hazardous Waste Permit Process 18IDBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies Idaho Hazardous Waste Management Act IDAPA 58.01.05 Rules and Standards for Hazardous Waste 40 CFR 124.31 Pre-application public meeting and notice 40 CRF 124.10 Public notice of permit actions and public comment period 40 CFR 124.12 Public hearings 40 CFR 270.13 Contents of Part A of the permit application Triggers None specified Click "Edit With Form" above to add content 18IDBHazardousWastePermitProcess.pdf 18IDBHazardousWastePermitProcess.pdf

15

GRR/Section 6-TX-b - Construction Storm Water Permitting Process | Open  

Open Energy Info (EERE)

6-TX-b - Construction Storm Water Permitting Process 6-TX-b - Construction Storm Water Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-TX-b - Construction Storm Water Permitting Process 06TXBConstructionStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality EPA Regulations & Policies TPDES Construction General Permit (TXR150000) 30 Texas Administrative Code 205 General Permits for Waste Discharges Texas Water Code 26.040 General Permits Clean Water Act Triggers None specified Click "Edit With Form" above to add content 06TXBConstructionStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

16

GRR/Section 6-CO-a - Extra-Legal Vehicle Permitting Process | Open Energy  

Open Energy Info (EERE)

6-CO-a - Extra-Legal Vehicle Permitting Process 6-CO-a - Extra-Legal Vehicle Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-CO-a - Extra-Legal Vehicle Permitting Process 06COAExtraLegalVehiclePermittingProcess.pdf Click to View Fullscreen Contact Agencies Colorado Department of Transportation Regulations & Policies Rules and Regulations of the Colorado Department of Transportation Pertaining to Transport Permits for the Movement of Extra-Legal Vehicles or Loads C.R.S § 42-4-505: Longer Vehicle Combinations C.R.S § 42-4-510: Permits for Excess Size and Weight Triggers None specified Click "Edit With Form" above to add content 06COAExtraLegalVehiclePermittingProcess.pdf Error creating thumbnail: Page number not in range.

17

GRR/Section 18-CO-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-CO-b - Hazardous Waste Permit Process GRR/Section 18-CO-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CO-b - Hazardous Waste Permit Process 18COBHazardousWastePermitProcess.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies Colorado Hazardous Waste Regulations Part 260 Triggers None specified Click "Edit With Form" above to add content 18COBHazardousWastePermitProcess.pdf 18COBHazardousWastePermitProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Hazardous waste is a regulated substance and facilities that treat, store

18

GRR/Section 3-WA-c - Utility Franchise or Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-WA-c - Utility Franchise or Permit Process GRR/Section 3-WA-c - Utility Franchise or Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-c - Utility Franchise or Permit Process 3-WA-c - Utility Franchise or Permit Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Department of Transportation Regulations & Policies WAC 468-34-060 WAC 468-34-080 WAC 468-34-110 WAC 468-34-160 WAC 468-34-170 Triggers None specified This flowchart illustrates the process of obtaining a franchise or permit through a state highway right of way in Washington State. A utility permit or franchise is required for occupancy of a highway right of way by utility facilities, including private lines. WAC 468-34-160. The process is

19

GRR/Section 18-AK-c - Waste Disposal Permit Process | Open Energy  

Open Energy Info (EERE)

AK-c - Waste Disposal Permit Process AK-c - Waste Disposal Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-AK-c - Waste Disposal Permit Process 18AKC - WasteDisposalPermitProcess (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation Regulations & Policies AS 46.03.110 Waste Disposal Permit Regulations 18 AAC 60.200 et seq Triggers None specified Click "Edit With Form" above to add content 18AKC - WasteDisposalPermitProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Department of Environmental Conservation (DEC) is responsible

20

GRR/Section 18-OR-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

OR-b - Hazardous Waste Permit Process OR-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-OR-b - Hazardous Waste Permit Process 18ORBHazardousWastePermitProcess (1).pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Oregon Department of Environmental Quality Oregon Public Health Division Oregon Public Utility Commission Oregon Department of Fish and Wildlife Oregon Water Resources Department Regulations & Policies OAR 340-105: Management Facility Permits OAR 340-120: Hazardous Waste Management ORS 466: Storage, Treatment, and Disposal Triggers None specified Click "Edit With Form" above to add content 18ORBHazardousWastePermitProcess (1).pdf

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

GRR/Section 18-UT-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

UT-b - Hazardous Waste Permit Process UT-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-UT-b - Hazardous Waste Permit Process 18UTBHazardousWastePermitProcess (1).pdf Click to View Fullscreen Contact Agencies Utah Department of Environmental Quality Regulations & Policies Hazardous Waste Rules R315-1 et seq Triggers None specified Click "Edit With Form" above to add content 18UTBHazardousWastePermitProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A hazardous waste is specifically listed by the Utah Solid and Hazardous Waste Rules or exhibits a characteristic such as ignitability, corrosivity,

22

GRR/Section 6-TX-a - Extra-Legal Vehicle Permitting Process | Open Energy  

Open Energy Info (EERE)

6-TX-a - Extra-Legal Vehicle Permitting Process 6-TX-a - Extra-Legal Vehicle Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-TX-a - Extra-Legal Vehicle Permitting Process 06TXAExtraLegalVehiclePermittingProcess.pdf Click to View Fullscreen Contact Agencies Texas Department of Motor Vehicles Texas Department of Transportation Regulations & Policies Tex. Transportation Code § 621 Tex. Transportation Code § 622 Tex. Transportation Code § 623 43 TAC 219 Triggers None specified Click "Edit With Form" above to add content 06TXAExtraLegalVehiclePermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

23

GRR/Section 18-AK-b - Hazardous Waste Permit Process | Open Energy  

Open Energy Info (EERE)

8-AK-b - Hazardous Waste Permit Process 8-AK-b - Hazardous Waste Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-AK-b - Hazardous Waste Permit Process 18AKB - HazardousWastePermitProcess (1).pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation United States Environmental Protection Agency Regulations & Policies AS 46.03.302 18 AAC 60.020 Triggers None specified Click "Edit With Form" above to add content 18AKB - HazardousWastePermitProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Department of Environmental Conservation defers to the federal

24

GRR/Section 14-OR-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-OR-b - NPDES Permitting Process GRR/Section 14-OR-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-OR-b - NPDES Permitting Process 14ORBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Oregon Department of Environmental Quality Regulations & Policies OAR Division 45 Regulations Pertaining to NPDES and WPCF Permits Triggers None specified Click "Edit With Form" above to add content 14ORBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative As part of its efforts to protect and improve Oregon's water quality, DEQ

25

GRR/Section 14-ID-b - NPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-ID-b - NPDES Permitting Process GRR/Section 14-ID-b - NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-ID-b - NPDES Permitting Process 14IDBNPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality United States Environmental Protection Agency Triggers None specified Click "Edit With Form" above to add content 14IDBNPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 'National Pollutant Discharge Elimination System Permits' The NPDES program requires facilities discharging from a point source into

26

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site  

Broader source: Energy.gov (indexed) [DOE]

0: Blue Coat Director HTTP Trace Processing Flaw Permits 0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks September 19, 2011 - 8:45am Addthis PROBLEM Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks. PLATFORM: All versions of Director prior to 5.5.2.3 are vulnerable. ABSTRACT: A vulnerability was reported in Blue Coat Director. A remote user can conduct cross-site scripting attacks. reference LINKS: Blue Coat Advisories ID: SA62 SecurityTracker Alert ID: 1026061 Blue Coat Director 510 Blue Coat SGME 5 IMPACT ASSESSMENT: Medium Discussion: An attacker can use the HTTP TRACE method to echo malicious script back to the client as part of a Cross Site Scripting (XSS) attack. No

27

House Passage of H.R. 5254 - The Refinery Permit Process Schedule Act |  

Broader source: Energy.gov (indexed) [DOE]

Passage of H.R. 5254 - The Refinery Permit Process Schedule Passage of H.R. 5254 - The Refinery Permit Process Schedule Act House Passage of H.R. 5254 - The Refinery Permit Process Schedule Act June 8, 2006 - 2:17pm Addthis Statement from Secretary Bodman WASHINGTON, DC - The following is a statement from the Secretary Samuel W. Bodman of the Department of Energy on the passage of House Resolution 5254, The Refinery Permit Process Schedule Act: "I commend the House of Representatives for their passage of this important piece of legislation. Expanding our nation's refining capacity is an important part of President Bush's four-point plan to confront high gasoline prices and is a key component to strengthening our nation's energy security. By increasing our nation's domestic refining capacity we can help grow our nation's economy and reduce our reliance on foreign sources

28

GRR/Section 14-WA-b - State NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-b - State NPDES Permitting Process GRR/Section 14-WA-b - State NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-b - State NPDES Permitting Process 14-WA-b - State NPDES Permitting Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology United States Environmental Protection Agency Regulations & Policies Clean Water Act Chapter 90.48 RCW Chapter 173-216 WAC Triggers None specified Section 402 of the Clean Water Act (CWA) required the Environmental Protection Agency (EPA) to establish the National Pollutant Discharge Elimination System (NPDES) to regulate discharge of pollutants from point sources. In Washington, the EPA has delegated responsibility of NPDES to

29

File:06TXAExtraLegalVehiclePermittingProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

TXAExtraLegalVehiclePermittingProcess.pdf TXAExtraLegalVehiclePermittingProcess.pdf Jump to: navigation, search File File history File usage Metadata File:06TXAExtraLegalVehiclePermittingProcess.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 43 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 09:13, 10 June 2013 Thumbnail for version as of 09:13, 10 June 2013 1,275 × 1,650 (43 KB) Abergfel (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-TX-a - Extra-Legal Vehicle Permitting Process

30

GRR/Section 19-WA-b - New Water Right Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-WA-b - New Water Right Permit Process GRR/Section 19-WA-b - New Water Right Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-b - New Water Right Permit Process 19-WA-b - New Water Right Permit Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 Triggers None specified Washington uses a prior appropriation system for the distribution of both surface water and ground water rights in which water users receive the right to use water on a "first in time, first in right" basis. Under Washington law, the waters of Washington belong collectively to the public

31

GRR/Section 14-FD-b - EPA NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

FD-b - EPA NPDES Permitting Process FD-b - EPA NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-FD-b - EPA NPDES Permitting Process 14FDBEPANPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency Regulations & Policies Clean Water Act 40 CFR 122 EPA Administered NPDES 40 CFR 124 EPA Decisionmaking Procedures Triggers None specified Click "Edit With Form" above to add content 14FDBEPANPDESPermittingProcess.pdf 14FDBEPANPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The National Pollutant Discharge Elimination System (NPDES) regulations at

32

GRR/Section 14-TX-b - Texas NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

14-TX-b - Texas NPDES Permitting Process 14-TX-b - Texas NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-TX-b - Texas NPDES Permitting Process 14TXBTexasNPDESPermittingProcess (4).pdf Click to View Fullscreen Contact Agencies Railroad Commission of Texas United States Environmental Protection Agency Regulations & Policies Tex. Water Code § 26.131(b) 16 TAC 3.8 Memorandum of Understanding between the RRC and the TCEQ 16 TAC 3.30 Triggers None specified Click "Edit With Form" above to add content 14TXBTexasNPDESPermittingProcess (4).pdf 14TXBTexasNPDESPermittingProcess (4).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

33

GRR/Section 14-MT-b - MPDES Permitting Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-MT-b - MPDES Permitting Process GRR/Section 14-MT-b - MPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-MT-b - MPDES Permitting Process 14MTBMPDESPermittingProcess.pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality United States Environmental Protection Agency Regulations & Policies MCA 75-5-402: Duties of MDEQ MCA 75-5-403: Denial, Modification, Review 75-5-611: Violation, Hearing Triggers None specified Click "Edit With Form" above to add content 14MTBMPDESPermittingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

34

A study of decision making in the power plant permitting process in Appalachia. Final report  

SciTech Connect (OSTI)

Results of prior work and prevalent opinion in both private and public sectors suggested that an improved permitting process that assures better communications among decision-making bodies, utility companies and regulating agencies, and which removes inefficiencies could shorten this time lag. Four recently-permitted Appalachian power stations were selected for detailed analysis: Pleasants Power Station, Pleasants County, West Virginia; Miller Steam Plant, Jefferson County, Alabama; Cherokee Power Station, Cherokee County, South Carolina; Homer City Power Station, Indiana County, Pennsylvania.

Not Available

1981-03-01T23:59:59.000Z

35

GRR/Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) | Open  

Open Energy Info (EERE)

18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-CA-b - RCRA Process (Hazardous Waste Facility Permit) 18CABRCRAProcess (2).pdf Click to View Fullscreen Contact Agencies California Environmental Protection Agency Department of Toxic Substances Control Regulations & Policies Resource Conservation and Recovery Act 40 CRF 261 Title 22, California Code of Regulations, Division 4.5 Triggers None specified Click "Edit With Form" above to add content 18CABRCRAProcess (2).pdf 18CABRCRAProcess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

36

Data Quality Objectives Process for Designation of K Basins Debris  

SciTech Connect (OSTI)

The U.S. Department of Energy has developed a schedule and approach for the removal of spent fuels, sludge, and debris from the K East (KE) and K West (KW) Basins, located in the 100 Area at the Hanford Site. The project that is the subject of this data quality objective (DQO) process is focused on the removal of debris from the K Basins and onsite disposal of the debris at the Environmental Restoration Disposal Facility (ERDF). This material previously has been dispositioned at the Hanford Low-Level Burial Grounds (LLBGs) or Central Waste Complex (CWC). The goal of this DQO process and the resulting Sampling and Analysis Plan (SAP) is to provide the strategy for characterizing and designating the K-Basin debris to determine if it meets the Environmental Restoration Disposal Facility Waste Acceptance Criteria (WAC), Revision 3 (BHI 1998). A critical part of the DQO process is to agree on regulatory and WAC interpretation, to support preparation of the DQO workbook and SAP.

WESTCOTT, J.L.

2000-05-22T23:59:59.000Z

37

File:06COAExtraLegalVehiclePermittingProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

COAExtraLegalVehiclePermittingProcess.pdf COAExtraLegalVehiclePermittingProcess.pdf Jump to: navigation, search File File history File usage File:06COAExtraLegalVehiclePermittingProcess.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 44 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:34, 6 February 2013 Thumbnail for version as of 10:34, 6 February 2013 1,275 × 1,650 (44 KB) Dfitzger (Talk | contribs) 16:28, 4 February 2013 Thumbnail for version as of 16:28, 4 February 2013 1,275 × 1,650 (43 KB) Dfitzger (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

38

Integrated Water Treatment System (IWTS) Process Flow Diagram Mass Balance Calculations for K West Basin  

SciTech Connect (OSTI)

The purpose of this calculation is to develop the rational for the material balances that are documented in the KW Basin water system Level 1 process flow diagrams.

REED, A.V.

2000-02-28T23:59:59.000Z

39

The dynamics and physical processes of the Comoros Basin.  

E-Print Network [OSTI]

??Includes abstract. The main objective of this thesis was to investigate the circulation in the ComorosBasin using observed and model datasets. These data were used (more)

Collins, Charine

2013-01-01T23:59:59.000Z

40

Fuel Retrieval System Process Flow Diagrams Mass Balance Calculations for K West Basin  

SciTech Connect (OSTI)

This calculation justifies the numbers used for the material balance on the process flow diagrams for the KW Basin Fuel Retrieval Subproject. The purpose of these calculations is to develop the material balances that are documented in the Fuel Retrieval System (FRS) Process Flow Diagrams for future reference. The attached mass calculations were prepared in support of revising the fuel retrieval system process flow diagrams for the 105K West Basin. The calculations refer to diagram H-1-81164.

REED, A.V.

2000-01-03T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Earth-Ocean Interac-ons Basin-Scale Impacts & Processes  

E-Print Network [OSTI]

Earth-Ocean Interac-ons Basin-Scale Impacts & Processes Joseph Resing (JISAO ocean. Volcanic erup6ons, glacial flour. Submarine Hydrothermal and Volcanic -Hydrothermal ac-vity and trace nutrient Fe -Hydrothermal ac-vity and trace nutrient

42

Modeling basin- and plume-scale processes of CO2 storage for full-scale deployment  

SciTech Connect (OSTI)

Integrated modeling of basin- and plume-scale processes induced by full-scale deployment of CO{sub 2} storage was applied to the Mt. Simon Aquifer in the Illinois Basin. A three-dimensional mesh was generated with local refinement around 20 injection sites, with approximately 30 km spacing. A total annual injection rate of 100 Mt CO{sub 2} over 50 years was used. The CO{sub 2}-brine flow at the plume scale and the single-phase flow at the basin scale were simulated. Simulation results show the overall shape of a CO{sub 2} plume consisting of a typical gravity-override subplume in the bottom injection zone of high injectivity and a pyramid-shaped subplume in the overlying multilayered Mt. Simon, indicating the important role of a secondary seal with relatively low-permeability and high-entry capillary pressure. The secondary-seal effect is manifested by retarded upward CO{sub 2} migration as a result of multiple secondary seals, coupled with lateral preferential CO{sub 2} viscous fingering through high-permeability layers. The plume width varies from 9.0 to 13.5 km at 200 years, indicating the slow CO{sub 2} migration and no plume interference between storage sites. On the basin scale, pressure perturbations propagate quickly away from injection centers, interfere after less than 1 year, and eventually reach basin margins. The simulated pressure buildup of 35 bar in the injection area is not expected to affect caprock geomechanical integrity. Moderate pressure buildup is observed in Mt. Simon in northern Illinois. However, its impact on groundwater resources is less than the hydraulic drawdown induced by long-term extensive pumping from overlying freshwater aquifers.

Zhou, Q.; Birkholzer, J.T.; Mehnert, E.; Lin, Y.-F.; Zhang, K.

2009-08-15T23:59:59.000Z

43

Transportability Class of Americium in K Basin Sludge under Ambient and Hydrothermal Processing Conditions  

SciTech Connect (OSTI)

This report establishes the technical bases for using a ''slow uptake'' instead of a ''moderate uptake'' transportability class for americium-241 (241Am) for the K Basin Sludge Treatment Project (STP) dose consequence analysis. Slow uptake classes are used for most uranium and plutonium oxides. A moderate uptake class has been used in prior STP analyses for 241Am based on the properties of separated 241Am and its associated oxide. However, when 241Am exists as an ingrown progeny (and as a small mass fraction) within plutonium mixtures, it is appropriate to assign transportability factors of the predominant plutonium mixtures (typically slow) to the Am241. It is argued that the transportability factor for 241Am in sludge likewise should be slow because it exists as a small mass fraction as the ingrown progeny within the uranium oxide in sludge. In this report, the transportability class assignment for 241Am is underpinned with radiochemical characterization data on K Basin sludge and with studies conducted with other irradiated fuel exposed to elevated temperatures and conditions similar to the STP. Key findings and conclusions from evaluation of the characterization data and published literature are summarized here. Plutonium and 241Am make up very small fractions of the uranium within the K Basin sludge matrix. Plutonium is present at about 1 atom per 500 atoms of uranium and 241Am at about 1 atom per 19000 of uranium. Plutonium and americium are found to remain with uranium in the solid phase in all of the {approx}60 samples taken and analyzed from various sources of K Basin sludge. The uranium-specific concentrations of plutonium and americium also remain approximately constant over a uranium concentration range (in the dry sludge solids) from 0.2 to 94 wt%, a factor of {approx}460. This invariability demonstrates that 241Am does not partition from the uranium or plutonium fraction for any characterized sludge matrix. Most of the K Basin sludge characterization data is derived spent nuclear fuel corroded within the K Basins at 10-15?C. The STP process will place water-laden sludges from the K Basin in process vessels at {approx}150-180 C. Therefore, published studies with other irradiated (uranium oxide) fuel were examined. From these studies, the affinity of plutonium and americium for uranium in irradiated UO2 also was demonstrated at hydrothermal conditions (150 C anoxic liquid water) approaching those proposed for the STP process and even for hydrothermal conditions outside of the STP operating envelope (e.g., 150 C oxic and 100 C oxic and anoxic liquid water). In summary, by demonstrating that the chemical and physical behavior of 241Am in the sludge matrix is similar to that of the predominant species (uranium and for the plutonium from which it originates), a technical basis is provided for using the slow uptake transportability factor for 241Am that is currently used for plutonium and uranium oxides. The change from moderate to slow uptake for 241Am could reduce the overall analyzed dose consequences for the STP by more than 30%.

Delegard, Calvin H.; Schmitt, Bruce E.; Schmidt, Andrew J.

2006-08-01T23:59:59.000Z

44

Water Permits (Louisiana)  

Broader source: Energy.gov [DOE]

The Water Permits Division authorizes permits administered under the Water Quality Regulations. Louisiana's Water Quality Regulations require permits for the discharge of pollutants from any point...

45

Depositional and dissolutional processes and their resulting thinning patterns within the Middle Devonian Prairie Formation, Williston basin, North Dakota and Montana  

SciTech Connect (OSTI)

Within the Williston basin, thickness variations of the Prairie Formation are common and are interpreted to originate by two processes: differential accumulation of salt during deposition and differential removal of salt by dissolution. Unambiguous evidence for each process is rare because the Prairie/Winnipegosis interval is seldom cored within the US portion of the basin. Therefore, indirect methods, using well logs, provide the principal method for identifying characteristics of the two processes. The results of this study indicate that the two processes can be distinguished using correlations within the Prairie Formation. Several regionally correlative brining-upward and probably shoaling-upward sequences occur within the Prairie Formation. Near the basin center, the lowermost sequence is transitional with the underlying Winnipegosis Formation. This transition is characterized by thinly laminated basal carbonates that become increasingly interbedded with anhydrites of the basin-centered Ratner member. The remainder of the sequence progresses up through halite and culminates in the halite-dominated Esterhazy potash beds. Two overlying sequences also brine upward; however, these sequences lack the basal anhydrite and instead begin with halite and culminate in the Belle Plaine and Mountrail potash members, respectively. A fourth sequence is indicated by several feet of halite capping the Mountrail member in some parts of the basin. Subsequent erosion or dissolution prior to burial may have removed the upper portion of this sequence. Cross sections show that the lower Prairie gradually decreases in thickness from the basin to its margins. This thickens variation is most simply explained by decreasing accommodation potential due to decreased basin topography away from the basin depocenter and by depositional onlap of the Prairie toward the basin margins.

Oglesby, C.A.

1988-07-01T23:59:59.000Z

46

AN INVESTIGATION OF DEWATERING FOR THE MODIFIED IN-SITU RETORTING PROCESS, PICEANCE CREEK BASIN, COLORADO  

E-Print Network [OSTI]

c:es .B~l:JJ:. }eti. ',~, Colorado School of Mines, VoL 2'1,v Piceance Creek Basin v Colorado r and 9 p' 1974. Pc:u:~tBetween 'che White and Colorado Rivers, '! \\lo:ci:hwegt:ern

Mehran, M.

2013-01-01T23:59:59.000Z

47

Idaho NPDES Permits Webpage | Open Energy Information  

Open Energy Info (EERE)

Permits Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho NPDES Permits Webpage Abstract This webpage provides an overview of the process...

48

The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities  

E-Print Network [OSTI]

OPR). 2012. California Solar Permitting Guidebook.plus data from the California Solar Initiative and the U.S.The Sierra Clubs California Solar Permit Fee Campaign

Wiser, Ryan

2014-01-01T23:59:59.000Z

49

Seismic imaging of the axial region of the Valu Fa Ridge, Lau Basinthe accretionary processes of an intermediate back-arc spreading ridge  

Science Journals Connector (OSTI)

......Lau Basin-the accretionary processes of an intermediate back-arc...rate, crustal accretionary processes at mid-ocean ridges with...Trans Am. geophys. Un. Fall Mtg Suppl., 73(43), 133...centres and mid-ocean ridge processes, J. geophys. Res., 91......

Ian M. Turner; Christine Peirce; Martin C. Sinha

1999-08-01T23:59:59.000Z

50

Origin of cratonic basins  

SciTech Connect (OSTI)

Tectonic subsidence curves show that the Illinois, Michigan, and Williston basins formed by initial fault-controlled mechanical subsidence during rifting and by subsequent thermal subsidence. Thermal subsidence began around 525 Ma in the Illinois Basin, 520-460 Ma in the Michigan Basin, and 530-500 Ma in the Williston Basin. In the Illinois Basin, a second subsidence episode (middle Mississippian through Early Permian) was caused by flexural foreland subsidence in response to the Alleghanian-Hercynian orogeny. Past workers have suggested mantle phase changes at the base of the crust, mechanical subsidence in response to isostatically uncompensated excess mass following igneous intrusions, intrusion of mantle plumes into the crust, or regional thermal metamorphic events as causes of basin initiation. Cratonic basins of North America, Europe, Africa, and South America share common ages of formation, histories of sediment accumulation, temporal volume changes of sediment fills, and common dates of interregional unconformities. Their common date of formation suggests initiation of cratonic basins in response to breakup of a late Precambrian supercontinent. This supercontinent acted as a heat lens that caused partial melting of the lower crust and upper mantle followed by emplacement of anorogenic granites during extensional tectonics in response to supercontinent breakup. Intrusion of anorogenic granites and other partially melted intrusive rocks weakened continental lithosphere, thus providing a zone of localized regional stretching and permitting formation of cratonic basins almost simultaneously over sites of intrusion of these anorogenic granites and other partially melted intrusive rocks.

de V. Klein, G.; Hsui, A.T.

1987-12-01T23:59:59.000Z

51

RAPID/Best Practices/Coordinating Permit Offices | Open Energy...  

Open Energy Info (EERE)

accept the permit plan until the environmental review process is complete. DBEDT will conduct agency outreach and coordination to discuss federal, state, and county permits...

52

Processes involved in the origin and accumulation of hydrocarbon gases in the Yuanba gas field, Sichuan Basin, southwest China  

Science Journals Connector (OSTI)

Abstract Natural gases in the superimposed Sichuan Basin commonly experienced a history of remigration in marine carbonate reservoirs since the late Cretaceous. The reservoir in the Changxing Formation (P2c) in the Yuanba gas field in the Sichuan Basin is characterized by a great burial depth of 62007000m and a high temperature about 165C. The gas dryness is 99.7399.99%, and ?13C values of methane and ethane are?31.0 to?28.9 and?29.9 to?25.6, respectively. The chemical and isotopic compositions of natural gases, abundant reservoir solid bitumen, and high reservoir temperature (maximum to 240C) indicate that the \\{P2c\\} gases are of sapropelic origin and are derived from oil cracking. The paleo-oil layers, recognized by solid bitumen distribution, were mainly developed in high position traps when the paleo-oil accumulated during the early Jurassic. Reconstructed structural evolution shows the northwest was uplifted sharply and southern part dipped gently to the north in the gas field after oil cracking. Fluid potential analyses based on changes in the structural configuration imply that gas should re-migrate mainly to the northwest. The observations that paleo-oil-water contacts are mainly above the present day gas-water contacts in the northwest traps, and are below present day gas-water contacts in the middle and eastern traps also confirm the gas remigration trend. Currently, high gas production wells are mainly located in northwest traps and in high positions in the middle and eastern traps. Systematic analyses on early paleo-oil accumulation and late gas remigration processes can reduce the economic risks associated with natural gas exploration in the northeastern Sichuan Basin.

Pingping Li; Fang Hao; Xusheng Guo; Huayao Zou; Xinya Yu; Guangwei Wang

2015-01-01T23:59:59.000Z

53

Class 1 Permit Modification Notification  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Class 1 Permit Modification to the Hazardous Waste Facility Permit, Permit Number: NM4890139088-TSDF Dear Mr. Kieling : Enclosed is a Class 1 Permit Modification Notification 1 0:...

54

Arizona Department of Environmental Quality's Individual Permits...  

Open Energy Info (EERE)

process for an individual AZPDES permit. Author Arizona Department of Environmental Quality Published ADEQ, Date Not Provided DOI Not Provided Check for DOI availability: http:...

55

Industrial Discharge Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

All businesses and government agencies discharging process wastewater to the public sewer system must report their activities to DC Water's Pretreatment Center. Wastewater discharge permits are...

56

K Basin Sludge Conditioning Process Testing Fate of PCBs During K Basin Sludge Dissolution in Nitric Acid and with Hydrogen Peroxide Addition  

SciTech Connect (OSTI)

The work described in this report is part of the studies being performed to address the fate of polychlorinated biphenyls (PCBs) in K Basin sludge before the sludge can be transferred to the Tank Waste Remediation System (TWRS) double shell tanks. One set of tests examined the effect of hydrogen peroxide on the disposition of PCBs in a simulated K Basin dissolver solution containing 0.5 M nitric acid/1 M Fe(NO{sub 3}){sub 3}. A second series of tests examined the disposition of PCBs in a much stronger ({approx}10 M) nitric acid solution, similar to that likely to be encountered in the dissolution of the sludge.

GM Mong; AJ Schmidt; EW Hoppe; KH Pool; KL Silvers; BM Thornton

1999-01-04T23:59:59.000Z

57

Geohydrological feasibility study of the Black Warrior Basin for the potential applicability of Jack W. McIntyre`s patented process  

SciTech Connect (OSTI)

Geraghty & Miller, Inc. of Midland, Texas conducted geological and hydrological feasibility studies of the potential applicability of Jack W. Mclntyre`s patented process for the recovery of natural gas from coalbed/sand formations in the Black Warrior Basin of Mississippi and Alabama through literature surveys. Methane gas from coalbeds in the Black Warrior Basin is confined to the coal fields of northern Alabama. Produced water from degasification of coalbeds is currently disposed by surface discharge. Treatment prior to discharge consists of short-term storage and in-stream dilution. Mr. Mclntyre`s process appears to be applicable to the Black Warrior Basin and could provide an environmentally sound alternative for produced water production.

Reed, P.D.

1994-03-01T23:59:59.000Z

58

Zoning and Permitting Resources  

Broader source: Energy.gov [DOE]

Zoning and permitting is commonly controlled by local governments and may be applicable to both residential and commercial properties.

59

Two photo permits are available: Daily Photographer Permit and Annual Photographer Permit. Daily Photographer Permit is $75 and includes gate admission for up to 15 adults and photographer. To reserve  

E-Print Network [OSTI]

Two photo permits are available: Daily Photographer Permit and Annual Photographer Permit. Daily of the photo session will be $75 plus a $25 processing fee. Your Daily Photo Badge can be picked up the business day before. Any permits purchased on the day of the photo session will be $225 and subject

Netoff, Theoden

60

Permitting Guides | Department of Energy  

Energy Savers [EERE]

Permitting Guides Permitting Guides Standardized procedures for permitting hydrogen technologies and systems are not yet well established. As a first step, DOE sponsored...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

GRR/Section 7-NV-a - Permit to Construct and Permit to Operate | Open  

Open Energy Info (EERE)

7-NV-a - Permit to Construct and Permit to Operate 7-NV-a - Permit to Construct and Permit to Operate < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-NV-a - Permit to Construct and Permit to Operate 07NVAPermitToConstructAndPermitToOperate (3).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Triggers None specified Click "Edit With Form" above to add content 07NVAPermitToConstructAndPermitToOperate (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 7-NV-a.1 and 6-NV-a.2 - Has an Environmental Review been Completed for Construction? The developer must make sure to undergo an environmental process before

62

Geohydrologic feasibility study of the Piceance Basin of Colorado for the potential applicability of Jack W. McIntyre`s patented gas/produced water separation process  

SciTech Connect (OSTI)

Geraghty & Miller, Inc. of Midland, Texas conducted geologic and hydrologic feasibility studies of the potential applicability of Jack McIntyre`s patented process for the recovery of natural gas from coalbed/sand formations in the Piceance Basin through literature surveys. Jack McIntyre`s tool separates produced water from gas and disposes of the water downhole into aquifers unused because of poor water quality, uneconomic lifting costs or poor aquifer deliverability. The beneficial aspects of this technology are two fold. The process increases the potential for recovering previously uneconomic gas resources by reducing produced water lifting, treatment and disposal costs. Of greater importance is the advantage of lessening the environmental impact of produced water by downhole disposal. Results from the survey indicate that research in the Piceance Basin includes studies of the geologic, hydrogeologic, conventional and unconventional recovery oil and gas technologies. Available information is mostly found centered upon the geology and hydrology for the Paleozoic and Mesozoic sediments. Lesser information is available on production technology because of the limited number of wells currently producing in the basin. Limited information is available on the baseline geochemistry of the coal/sand formation waters and that of the potential disposal zones. No determination was made of the compatibility of these waters. The study also indicates that water is often produced in variable quantities with gas from several gas productive formations which would indicate that there are potential applications for Jack McIntyre`s patented tool in the Piceance Basin.

Kieffer, F.

1994-02-01T23:59:59.000Z

63

Stormwater Permits (Vermont)  

Broader source: Energy.gov [DOE]

Stormwater permits are required for the construction of a new generation facility, the reconstruction or expansion of a facility, the operation of a generation facility which discharges stormwater...

64

Hanford Dangerous Waste Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

training, security) * Closure plan Tank-Related Permit Units New * 149 single-shell tanks (SSTs) * 28 double-shell tanks (DSTs) Existing * 242-A Evaporator * Waste Treatment...

65

Remaining Sites Verification Package for the 100-D-50:5 Process Sewers (183-DR Sedimentation Basin Drains), Waste Site Reclassification Form 2006-025  

SciTech Connect (OSTI)

The 100-D-50:5 subsite encompasses the southern process sewers formerly servicing the 183-DR coagulation and sedimentation basins and proximate surface runoff collection drains. The results of confirmatory sampling of pipeline sediments and underlying soils at the 100-D-50:5 subsite demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

L. M. Dittmer

2007-11-06T23:59:59.000Z

66

Wind Project Permitting | Open Energy Information  

Open Energy Info (EERE)

Project Permitting Project Permitting Jump to: navigation, search Invenergy is the developer of the 129-MW Forward Wind Energy Center project near Fond du Lac, Wisconsin, that came online in 2008. Photo by Ruth Baranowski, NREL 16412 As with other energy facility permitting processes, the goal of the wind project permitting process is to reach decisions that are timely, minimize challenges, and ensure compliance with laws and regulations that provide for necessary environmental protection.[1] Resources National Wind Coordinating Committee. (2002). Permitting of Wind Energy Facilities. Accessed August 28, 2013. This handbook is written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public.

67

Environmental Permit Application Background Statement (Delaware)  

Broader source: Energy.gov [DOE]

The purpose of Chapter 79 of Delaware Title 7 is to ensure that the State has adequate information about the background of applicants or regulated parties for the purposes of processing permits and...

68

Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program  

SciTech Connect (OSTI)

Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

Goldstein, D.R.; Cressman, A.W.

1999-07-01T23:59:59.000Z

69

Direct Discharge Permit (Vermont)  

Broader source: Energy.gov [DOE]

A direct discharge permit is required if a project involves the discharge of pollutants to state waters. For generation purposes, this involves the withdrawal of surface water for cooling purposes...

70

Presidential Permits- Procedures  

Broader source: Energy.gov [DOE]

Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with the public interest. The two criteria used by DOE to determine if a...

71

City of Portland - Streamlined Building Permits for Residential Solar  

Broader source: Energy.gov (indexed) [DOE]

Commercial Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Oregon Program Type Solar/Wind Permitting Standards Provider City of Portland The City of Portland's Bureau of Development Services (BDS) developed an electronic permitting process for residential solar energy system installations. With this streamlined, expedited process, solar contractors can submit the project plans and permit application online for residential installations. In order to file the online application, the contractor must first be trained. The City of Portland has staff at the permitting desk trained as solar experts to assist solar contractors who need help filing their permits in person. This process has a turnaround time of

72

Stratigraphic responses to geologic processes: Late Pennsylvanian eustasy and tectonics in the Pedregosa and Orogrande basins, Ancestral Ricky Mountains  

Science Journals Connector (OSTI)

...F m - 1 r Nakaye * - Fm i Panther -Seep -- ^ Fm i I I Lead Camp -LLs-L...basins. Brick pattern denotes car- bonate facies; dot-dash...ian P=Prismopora (bryozoan) CAR=ident i f ied by C .A . Ross...v ) T. f.T. venlricosus (CAR) perialis (GLW) a v ) IT...

73

Hanford Facility RCRA permit handbook  

SciTech Connect (OSTI)

Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

NONE

1996-03-01T23:59:59.000Z

74

TECHNOLOGY DEVELOPMENT AND DEPLOYMENT OF SYSTEMS FOR THE RETRIEVAL AND PROCESSING OF REMOTE-HANDLED SLUDGE FROM HANFORD K-WEST FUEL STORAGE BASIN  

SciTech Connect (OSTI)

In 2011, significant progress was made in developing and deploying technologies to remove, transport, and interim store remote-handled sludge from the 105-K West Fuel Storage Basin on the Hanford Site in south-central Washington State. The sludge in the 105-K West Basin is an accumulation of degraded spent nuclear fuel and other debris that collected during long-term underwater storage of the spent fuel. In 2010, an innovative, remotely operated retrieval system was used to successfully retrieve over 99.7% of the radioactive sludge from 10 submerged temporary storage containers in the K West Basin. In 2011, a full-scale prototype facility was completed for use in technology development, design qualification testing, and operator training on systems used to retrieve, transport, and store highly radioactive K Basin sludge. In this facility, three separate systems for characterizing, retrieving, pretreating, and processing remote-handled sludge were developed. Two of these systems were successfully deployed in 2011. One of these systems was used to pretreat knockout pot sludge as part of the 105-K West Basin cleanup. Knockout pot sludge contains pieces of degraded uranium fuel ranging in size from 600 {mu}m to 6350 {mu}m mixed with pieces of inert material, such as aluminum wire and graphite, in the same size range. The 2011 pretreatment campaign successfully removed most of the inert material from the sludge stream and significantly reduced the remaining volume of knockout pot product material. Removing the inert material significantly minimized the waste stream and reduced costs by reducing the number of transportation and storage containers. Removing the inert material also improved worker safety by reducing the number of remote-handled shipments. Also in 2011, technology development and final design were completed on the system to remove knockout pot material from the basin and transport the material to an onsite facility for interim storage. This system is scheduled for deployment in 2012. The prototype facility also was used to develop technology for systems to retrieve remote-handled transuranic sludge smaller than 6350 {mu}m being stored in underwater containers. After retrieving the sludge, the system will be used to load and transport the sludge for interim storage. During 2011, full-scale prototype systems were developed and tested to a Technology Readiness Level 6 as defined by U.S. Department of Energy standards. This system is scheduled for deployment in 2013. Operations also are scheduled for completion in 2014.

RAYMOND RE

2011-12-27T23:59:59.000Z

75

Broward County Online Solar Permitting (Florida) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Broward County Online Solar Permitting (Florida) Broward County Online Solar Permitting (Florida) Broward County Online Solar Permitting (Florida) < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Program Info State Florida Program Type Solar/Wind Permitting Standards Provider Unincorporated Broward County Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that are governed by a participating municipality. The online permitting system is designed to provide a one-stop solar permitting process with a single application form, electronic review and approval, and flat fee. Applicants can use this system to choose from pre-approved and pre-engineered solar panel mounting installation designs,

76

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

Sonnichsen, J.C.

1998-09-17T23:59:59.000Z

77

"Mobile money" services permit  

E-Print Network [OSTI]

"Mobile money" services permit cell phone users to send small amounts of money via text message to their friends and relatives. There are over 90 mobile money services in the world today, mainly in emergingTure oF Money october 2012 - April 2013 Muriel Ansley reynolds exhibit GAllery For the full exhibit checklist

Loudon, Catherine

78

Montana Water Quality Permit Application, Nondegradation Authorization...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Water Quality Permit Application, Nondegradation Authorization, and Permit FeesPermitting...

79

Hawaii Guidelines for NPDES Notice of General Permit Coverage...  

Open Energy Info (EERE)

an overview of the NPDES General Permit process. Author State of Hawaii Department of Health Published State of Hawaii, 92004 DOI Not Provided Check for DOI availability: http:...

80

Permit application handbook  

SciTech Connect (OSTI)

The objective of this handbook is to explain how to prepare a mining permit application which will satisfy the requirements of the Federal Surface Mining Control and Reclamation Act of 1977 (SMCRA) (Public Law 95-87). The requirements described in this Handbook come from the permanent program regulations issued by the Office of Surface Mining (OSM) on March 13, 1979 and the court decisions and regulatory changes up until June 1981. This Handbook was developed to provide mine operators, particularly operators of small Appalachian mines, with an explanation of the Federal permit application requirements and the work which will be entailed in satisfying these requirements. Requirement explanations in the following areas are presented: site description; surface waters; ground waters; cultural resources; road; topsoil handling; blasting plans; water quality control; excess spoil disposal; reclamation plan; and special mining conditions. (DMC)

Not Available

1981-06-23T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Delaware River Basin Commission (Multiple States) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

82

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

83

Interstate Commission on the Potomac River Basin (Multiple States) |  

Broader source: Energy.gov (indexed) [DOE]

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

84

City and County of Denver - Solar Panel Permitting (Colorado) | Department  

Broader source: Energy.gov (indexed) [DOE]

Solar Panel Permitting (Colorado) Solar Panel Permitting (Colorado) City and County of Denver - Solar Panel Permitting (Colorado) < Back Eligibility Commercial Construction General Public/Consumer Industrial Low-Income Residential Multi-Family Residential Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Department of Development Services Construction, Electrical, Plumbing and Zoning Permits* are required for Photovoltaic (PV) systems installed in the city of Denver. Denver provides same day permit review for most solar panel projects. More complex engineering projects may still be required to go through the Plan Review process. To obtain Zoning Permits for flush mounted solar panels, applicants must

85

Transmission/Permitting Atlas/State Data | Open Energy Information  

Open Energy Info (EERE)

Transmission/Permitting Atlas/State Data Transmission/Permitting Atlas/State Data < Transmission‎ | Permitting Atlas Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State State Siting Act State Preemptive Authority Siting/Permitting Entities Permit Processing Timeframe Arizona None If TLSC finds compliance with local land use unreasonable or unfeasible, then the TLSC may grant a certificate Arizona Corporation Commission (ACC); Transmission Line Siting Committee (TLSC) 210-240 Days California Public Utilities Code Section 1001 Local jurisdictions are preempted from regulating electric power line projects California Public Utilities Commission (CPUC) 18 months

86

Individual Permit for Storm Water  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Individual Permit Individual Permit Individual Permit for Storm Water The Individual Permit authorizes the discharge of storm water associated with historical industrial activities at LANL from specified solid waste management units and areas of concern, collectively referred to as Sites. October 15, 2012 Sandia Canyon Wetlands Sandia Canyon Wetlands in the early morning looking north. Get Expertise Environmental Communications & Public Involvement Email In the Individual Permit, to 'minimize' means to reduce and/or eliminate discharges of pollutants in storm water to the extent achievable. What is the Individual Permit for Storm Water? The Permit - NPDES No. NM0030759 - was issued by the U.S. Environmental Protection Agency, Region 6, on September 30, 2010 to Los Alamos National

87

Microsoft Word - Groundwater Discharge Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

State Renews Groundwater Discharge Permit for WIPP CARLSBAD, N.M., September 11, 2008 - The New Mexico Environment Department (NMED) has renewed the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) groundwater discharge permit until 2013. The permit regulates the discharge of water from WIPP facilities and operations to lined ponds, which protect groundwater resources. The permit allows WIPP to discharge domestic wastewater, non-hazardous wastewater and storm water into 13 on-site, synthetically-lined ponds. The new permit also provides for increased daily discharge volumes to allow more flexibility in plant operations. "This permit is the result of a positive year-long effort with the New Mexico Groundwater Quality Bureau," said Jody Plum, DOE Carlsbad Field Office Permitting and

88

Presidential Permits - Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with...

89

SWRCB General NPDES Permits | Open Energy Information  

Open Energy Info (EERE)

SWRCB General NPDES Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: SWRCB General NPDES...

90

Washington Joint Aquatic Resources Permit Application | Open...  

Open Energy Info (EERE)

Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Washington Joint Aquatic...

91

Caltrans Encroachment Permit Application Guide | Open Energy...  

Open Energy Info (EERE)

Permit Application Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Caltrans Encroachment Permit...

92

CDPHE Industrial Individual Wastewater Discharge Permit Application...  

Open Energy Info (EERE)

Legal Document- Permit ApplicationPermit Application: CDPHE Industrial Individual Wastewater Discharge Permit ApplicationLegal Abstract Application provided by the Colorado...

93

Hawaii Individual Wastewater Management Permit Packet | Open...  

Open Energy Info (EERE)

to library PermittingRegulatory Guidance - Supplemental Material: Hawaii Individual Wastewater Management Permit PacketPermittingRegulatory GuidanceSupplemental Material Author...

94

City of Portland - Streamlined Building Permits for Residential Solar  

Broader source: Energy.gov (indexed) [DOE]

Residential Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Oregon Program Type Green Building Incentive Provider City of Portland The City of Portland's Bureau of Development Services (BDS) developed an electronic permitting process for residential solar energy system installations. With this streamlined, expedited process, solar contractors can submit the project plans and permit application online for residential installations. In order to file the online application, the contractor must first be trained. The City of Portland has staff at the permitting desk trained as solar experts to assist solar contractors who need help filing their permits in person. This process has a turnaround time of approximately 2-3 business days for building permits.

95

Geohydrologic study of the Michigan Basin for the applicability of Jack W. McIntyre`s patented process for simultaneous gas recovery and water disposal in production wells  

SciTech Connect (OSTI)

Geraghty & Miller, Inc. of Midland, Texas conducted a geohydrologic study of the Michigan Basin to evaluate the applicability of Jack McIntyre`s patented process for gas recovery and water disposal in production wells. A review of available publications was conducted to identify, (1) natural gas reservoirs which generate large quantities of gas and water, and (2) underground injection zones for produced water. Research efforts were focused on unconventional natural gas formations. The Antrim Shale is a Devonian gas shale which produces gas and large quantities of water. Total 1992 production from 2,626 wells was 74,209,916 Mcf of gas and 25,795,334 bbl of water. The Middle Devonian Dundee Limestone is a major injection zone for produced water. ``Waterless completion`` wells have been completed in the Antrim Shale for gas recovery and in the Dundee Limestone for water disposal. Jack McIntyre`s patented process has potential application for the recovery of gas from the Antrim Shale and simultaneous injection of produced water into the Dundee Limestone.

Maryn, S.

1994-03-01T23:59:59.000Z

96

Request for Information on Permitting of Transmission Lines: Federal  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

97

Coastal Permit Program Rules (New Jersey) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Coastal Permit Program Rules (New Jersey) Coastal Permit Program Rules (New Jersey) Coastal Permit Program Rules (New Jersey) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Siting and Permitting Provider Department of Environmental Protection The Coastal Permit Program Rules provide the processes for permit reviews.

98

DOE Seeking Information on Transmission Line Permitting | Department of  

Broader source: Energy.gov (indexed) [DOE]

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

99

Request for Information on Permitting of Transmission Lines: Federal  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

100

WIPP Hazardous Waste Facility Permit Update  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification request that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of dollars [3]. Combining both the chap. 311 and RH TRU waste permit modification requests allows for both the regulator and DOE to expedite action on the modification requests. The Combined PMR reduces costs by having only one administrative process for both modification requests. (authors)

Kehrman, B.; Most, W. [Washington Regulatory and Environmental Services, 4021 National Parks Highway, Carlsbad, NM 88220 (United States)

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Presidential Permits | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Presidential Permits Presidential Permits Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits - Canada PRESIDENTIAL PERMITS - CANADA BACK TO TOP Docket No. Company Date Issued PP-6 Puget Sound Energy 04/28/81 PP-10 BPA 10/27/45 PP-10-1 BPA 11/30/65 PP-11-2 Fraser Papers 02/29/99 PP-11 Fraser Papers (Rescinded in PP-366) 11/18/10 PP-12 Maine 12/05/63 PP-13 NiMo Hogansburg 01/31/48 PP-18 Glacier Electric 12/12/52 PP-20 Eastern Maine 05/25/65 PP-22 BC Hydro 08/24/67 PP-22-1 BC Hydro 07/21/55 PP-22-2 BC Hydro 02/04/58 PP-22-3 BC Hydro 08/24/67 PP-22-4 BCTC 09/05/07 PP-23 Netley 07/20/55 PP-24 Long Sault 06/06/80 PP-25 NYPA 06/06/80 PP-28 Northern Electric 04/17/63

102

GRR/Section 15-WA-a - Air Quality Notice of Construction Permit | Open  

Open Energy Info (EERE)

5-WA-a - Air Quality Notice of Construction Permit 5-WA-a - Air Quality Notice of Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-a - Air Quality Notice of Construction Permit 15-WA-a - Air Quality Notice of Construction Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-400-110 WAC 173-400-111 WAC 173-400-171 Triggers None specified This flowchart illustrates the process for obtaining an Air Quality Notice of Construction Permit. The Washington State Department of Ecology (WSDE) oversees the permitting process under WAC 173-400. 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf

103

Solar Permitting & Inspection Webinar Series  

Office of Energy Efficiency and Renewable Energy (EERE)

ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

104

Well Permits (District of Columbia)  

Broader source: Energy.gov [DOE]

Well permits are required for the installation of wells in private and public space. Wells are defined as any trest hole, shaft, or soil excavation created by any means including, but not limited...

105

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

3. Estimated rail transportation rates for coal, basin to state, EIA data 3. Estimated rail transportation rates for coal, basin to state, EIA data Basin Destination State 2008 2009 2010 2008-2010 2009-2010 Northern Appalachian Basin Delaware $28.49 - W W - Northern Appalachian Basin Florida - $38.51 $39.67 - 3.0 Northern Appalachian Basin Georgia - W - - - Northern Appalachian Basin Indiana $20.35 $16.14 $16.64 -9.6 3.1 Northern Appalachian Basin Kentucky - - W - - Northern Appalachian Basin Maryland $19.64 $19.60 $20.41 1.9 4.2 Northern Appalachian Basin Michigan $14.02 $16.13 $16.23 7.6 0.6 Northern Appalachian Basin New Hampshire $43.43 $40.18 $39.62 -4.5 -1.4

106

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

4. Estimated rail transportation rates for coal, basin to state, EIA data 4. Estimated rail transportation rates for coal, basin to state, EIA data Basin Destination State 2008 2009 2010 2008-2010 2009-2010 Northern Appalachian Basin Delaware $26.24 - W W - Northern Appalachian Basin Florida - $35.10 $35.74 - 1.8 Northern Appalachian Basin Georgia - W - - - Northern Appalachian Basin Indiana $18.74 $14.70 $14.99 -10.6 1.9 Northern Appalachian Basin Kentucky - - W - - Northern Appalachian Basin Maryland $18.09 $17.86 $18.39 0.8 3.0 Northern Appalachian Basin Michigan $12.91 $14.70 $14.63 6.4 -0.5 Northern Appalachian Basin New Hampshire $40.00 $36.62 $35.70 -5.5 -2.5

107

Rack Permitting Efficient Handling of Tissue Cultures  

Science Journals Connector (OSTI)

...for Microbiology research-article Notes Rack Permitting Efficient Handling of Tissue...American Society for Microbiology NOTES Rack Permitting Efficient Handling of Tissue...of this communication is to describe a rack which permits the simultaneous handling...

Samuel Baron; Charles E. Buckler; Kenneth K. Takemoto

1966-11-01T23:59:59.000Z

108

Montana 310 Permit Database | Open Energy Information  

Open Energy Info (EERE)

Permit Database Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana 310 Permit Database Abstract Provides access to Montana's 310 permit mapping...

109

Advanced Chemistry Basins Model  

SciTech Connect (OSTI)

The DOE-funded Advanced Chemistry Basin model project is intended to develop a public domain, user-friendly basin modeling software under PC or low end workstation environment that predicts hydrocarbon generation, expulsion, migration and chemistry. The main features of the software are that it will: (1) afford users the most flexible way to choose or enter kinetic parameters for different maturity indicators; (2) afford users the most flexible way to choose or enter compositional kinetic parameters to predict hydrocarbon composition (e.g., gas/oil ratio (GOR), wax content, API gravity, etc.) at different kerogen maturities; (3) calculate the chemistry, fluxes and physical properties of all hydrocarbon phases (gas, liquid and solid) along the primary and secondary migration pathways of the basin and predict the location and intensity of phase fractionation, mixing, gas washing, etc.; and (4) predict the location and intensity of de-asphaltene processes. The project has be operative for 36 months, and is on schedule for a successful completion at the end of FY 2003.

William Goddard; Mario Blanco; Lawrence Cathles; Paul Manhardt; Peter Meulbroek; Yongchun Tang

2002-11-10T23:59:59.000Z

110

GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit | Open  

Open Energy Info (EERE)

10 - Did majority of RWQCB approve the permit 10 - Did majority of RWQCB approve the permit < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-b.10 - Did majority of RWQCB approve the permit Following the public hearing, the RWQCB votes on whether or not to approve the permit. The permit is approved with a majority vote. If the RWQCB denies the permit, the process ends. If the RWQCB votes to approve the permit, the permit is forwarded to the Environmental Protection Agency for approval. Estimated Time Clock.png 10 days0.0274 years 240 hours 1.429 weeks 0.329 months No explanation of time estimate. Logic Chain No Parents \V/ GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit (this page) \V/ No Dependents Under Development Add.png Add an Element

111

Hanfords Site-Wide Permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

* Across entire Hanford Site ("Facility") What the permit does NOT cover * Solely radioactive materials * Superfund sites How does the permit protect? * Requirements for...

112

Caltrans Transportation Permits Manual | Open Energy Information  

Open Energy Info (EERE)

Permits Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Caltrans Transportation Permits ManualLegal Abstract...

113

Standardized Permit Guidance | Open Energy Information  

Open Energy Info (EERE)

Permit Guidance Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Standardized Permit GuidanceLegal Abstract Standardized...

114

Nevada Department of Transportation - Occupancy Permits | Open...  

Open Energy Info (EERE)

Occupancy Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Department of Transportation - Occupancy Permits Abstract This website gives...

115

Montana Produced Water General Permit - Example Authorization...  

Open Energy Info (EERE)

Water General Permit - Example Authorization Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana...

116

permitting | OpenEI Community  

Open Energy Info (EERE)

permitting permitting Home Alevine's picture Submitted by Alevine(5) Member 29 July, 2013 - 14:46 Texas Legal Review BHFS flora and fauna leasing Legal review permitting roadmap Texas The NREL roadmap team recently met with our legal team Brownstein Hyatt Farber and Schreck (www.bhfs.com) for a review of the Texas portion of the Geothermal Regulatory Roadmap (GRR). BHFS provided excellent suggestions to the Section 3 flowcharts for geothermal leases on Texas state lands. The Texas portion of the GRR now encompasses a flowchart for Texas state land leasing on Permanent School Fund Lands, Texas Parks and Wildlife Department Lands, Land Trade Lands, and Relinquishment Act Lands. Additionally, BHFS provided many other helpful tips for clarifying other issue Kyoung's picture Submitted by Kyoung(155)

117

Permitting Best Practices Make Installing Solar Easier: Technical Assistance (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NREL staff NREL staff can help states and local jurisdictions assess permitting processes, standardization approaches across a region, and permit fee options. t e c h n i c a l a s s i s ta n c e Permitting Best Practices Make Installing Solar Easier Common-Sense Improvements Address Top-Three Permitting Issues The U.S. solar industry has reached a turning point. While photovoltaic (PV) hardware costs exhibit rapid decline, non-hardware balance of system (BOS) costs such as permitting and inspection have remained relatively constant. The United States comprises more than 18,000 local jurisdictions whose permitting requirements and fees vary widely. The lack of permitting standardization across jurisdictions and inefficient permitting processes create challenges

118

GRR/Section 15-CO-a - Air Permit - Construction Permit | Open Energy  

Open Energy Info (EERE)

5-CO-a - Air Permit - Construction Permit 5-CO-a - Air Permit - Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CO-a - Air Permit - Construction Permit 15COAAirPermitConstructionPermit.pdf Click to View Fullscreen Contact Agencies Colorado Department of Public Health and Environment Regulations & Policies 5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements Triggers None specified Click "Edit With Form" above to add content 15COAAirPermitConstructionPermit.pdf 15COAAirPermitConstructionPermit.pdf 15COAAirPermitConstructionPermit.pdf Error creating thumbnail: Page number not in range. Flowchart Narrative The Colorado Department of Public Health and Environment (CDPHE) Air

119

City of Santa Monica - Expedited Permitting for Green Buildings |  

Broader source: Energy.gov (indexed) [DOE]

Expedited Permitting for Green Buildings Expedited Permitting for Green Buildings City of Santa Monica - Expedited Permitting for Green Buildings < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Water Heating Wind Program Info State California Program Type Green Building Incentive Provider City of Santa Monica The City of Santa Monica allows for priority plan check processing for building projects that are registered with the United States Green Building Council for certification under the Leadership in Energy and Environmental Design (LEED) Green Building Rating System. The priority status applies to

120

Permit Parking Emergency Blue Light  

E-Print Network [OSTI]

P P P P P P P P P P P P P P P P P PP P P P P P Permit Parking Food P P Emergency Blue Light underground Emergency Blue Light outdoors Wheelchair Wheelchair prior arrangements necessary Telephone Visitor 144 Albert Street 21 152 Albert Street 20 154 Albert Street 94 34 Barrie Street 91 68 Barrie Street 90

Abolmaesumi, Purang

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

122

Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

123

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

43 $0.0294 W - W W - - - 43 $0.0294 W - W W - - - Northern Appalachian Basin Florida $0.0161 W W W W $0.0216 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $0.0296 $0.0277 $0.0292 $0.0309 $0.0325 $0.0328 $0.0357 $0.0451 $0.0427 4.7 -5.3 Northern Appalachian Basin Massachusetts W W - - - - - - - - -

124

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

$15.49 $13.83 W - W W - - - $15.49 $13.83 W - W W - - - Northern Appalachian Basin Florida $19.46 W W W W $29.49 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $10.33 $9.58 $10.68 $12.03 $13.69 $14.71 $16.11 $19.72 $20.69 9.1 4.9 Northern Appalachian Basin Massachusetts W W - - - - - - - - -

125

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

$0.0323 $0.0284 W - W W - - - $0.0323 $0.0284 W - W W - - - Northern Appalachian Basin Florida $0.0146 W W W W $0.0223 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $0.0269 $0.0255 $0.0275 $0.0299 $0.0325 $0.0339 $0.0380 $0.0490 $0.0468 7.2 -4.3 Northern Appalachian Basin Massachusetts W W - - - - - - - - -

126

Crosswell seismic imaging in the Permian Basin, West Texas, USA  

SciTech Connect (OSTI)

Crosswell seismic imaging technology has advanced rapidly over the last three years as the processing methods have become more robust, the cost of data acquisition has fallen, and the interwell distances of operation have increased. The Permian Basin of west Texas, USA is proving to be an ideal environment in which to develop this technology because of the relatively low seismic attenuation of the carbonate-dominated lithology, the moderate well spacings in the large number of mature fields, and the unusually high number of reflecting horizons. Current technology permits us to operate in carbonates at well spacings on the order of 2000 ft (650 m) and to image P- and S-wave reflecting horizons on a scale of 8 to 25 ft (2.4 to 7.6 m). Crosswell technology is not limited to carbonates, although the majority of recent applications have been in this environment. We are involved in three separate crosswell experiments in the Permian Basin, each with unique objectives. The first experiment involves a CO{sub 2} pilot project in a Grayburg Formation reservoir on the eastern edge of the Central Basin Platform. Here we are attempting to characterize the reservoir at a scale unobtainable from 3-D surface seismic data and to image CO{sub 2} fronts directly. The second experiment deals with a waterflood in a Middle Clearfork Formation reservoir on the Eastern Shelf, where we are trying to explain the erratic response of adjacent wells to water injection. In the third project we are trying to image the structure and stratigraphy of subtle {open_quotes}anomalies{close_quotes} in 3-D surface seismic images of the Wolfcamp Formation.

Langan, R.T.; Harris, J.M.; Jensen, T.L. [and others

1995-12-31T23:59:59.000Z

127

DOE to Hold Public Information Meetings on Requested Permit Modifications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Requested Permit Modifications Requested Permit Modifications CARLSBAD, N.M., March 15, 2001 -- The public is invited to comment on requested modifications to the Hazardous Waste Facility Permit for the Waste Isolation Pilot Plant (WIPP). Submittal of the proposed modification request to the New Mexico Environment Department (NMED) by the U.S. Department of Energy (DOE) begins a formal review process that includes a 60-day public comment period and public information meetings. In its submittal, DOE requests five permit changes to modify conditions at the facility. The proposed modifications conform to industry standards for the handling of hazardous materials and would continue to protect the safety of the facility, its employees, and the public. The first two requested changes would eliminate redundant and obsolete training

128

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity, consistency, and transparency by describing each entity's role and responsibilities when project applicants wish to build electric transmission facilities. Additionally, the MOU designates a "Lead Agency" serving as the single point-of-contact for coordinating all federal environmental reviews

129

Basin Destination State  

U.S. Energy Information Administration (EIA) Indexed Site

Basin Basin Destination State 2001 2002 2003 2004 2005 2006 2007 2008 2009 2001-2009 2008-2009 Northern Appalachian Basin Delaware W W $16.45 $14.29 W - W W - - - Northern Appalachian Basin Florida $21.45 W W W W $28.57 W W W W W Northern Appalachian Basin Illinois W W - - - - - - - - - Northern Appalachian Basin Indiana W W W W W W W W W W W Northern Appalachian Basin Kentucky - - W W - - - - - - - Northern Appalachian Basin Maryland $11.39 $10.39 $11.34 $12.43 $13.69 $14.25 $15.17 $18.16 $18.85 6.5 3.8

130

General Air Permits (Louisiana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

General Air Permits (Louisiana) General Air Permits (Louisiana) General Air Permits (Louisiana) < Back Eligibility Agricultural Construction Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Louisiana Program Type Environmental Regulations Provider Louisiana Department of Environmental Quality Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any regulated air pollutant do not need a permit. The Louisiana Department of Environmental Quality issues Title V General Permits. The permit is developed based on equipment types versus facility types, the general permits are not limited in their use to a specific industry or category. Title V permits combine

131

Improving Performance of Federal Permitting and Review of Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improving Performance of Federal Permitting and Review of Infrastructure Improving Performance of Federal Permitting and Review of Infrastructure Projects Improving Performance of Federal Permitting and Review of Infrastructure Projects The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability, in collaboration with the Member Agencies of the Steering Committee (Member Agencies) created under Executive Order 13604 of March 22, 2012, and pursuant to the June 7, 2013 Transmission Presidential Memorandum, is seeking public input on a draft Integrated, Interagency Pre-Application (IIP) Process. The proposed IIP Process is intended to improve interagency and intergovernmental coordination focused on ensuring that project proponents develop and submit accurate and complete information early in the project planning process to facilitate efficient

132

Water Basins Civil Engineering  

E-Print Network [OSTI]

Water Basins Civil Engineering Objective · Connect the study of water, water cycle, and ecosystems with engineering · Discuss how human impacts can effect our water basins, and how engineers lessen these impacts: · The basic concepts of water basins are why they are important · To use a topographic map · To delineate

Provancher, William

133

Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Texas-Louisiana- Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin W. Gulf Coast Basin Appalachian Basin Wind River Basin Eastern Shelf NW Shelf Abo Sussex-Shannon Muddy J Mesaverde- Lance-Lewis Medina/Clinton-Tuscarora Bradford-Venango-Elk Berea-Murrysville Piceance Basin Bossier Williston Basin Ft Worth Basin Davis Bighorn Basin Judith River- Eagle Permian Basin Anadarko Basin Denver Basin San Juan Basin North-Central Montana Area Uinta Basin Austin Chalk Codell-Niobrara Penn-Perm Carbonate Niobrara Chalk Dakota Morrow Mesaverde Thirty- One Cleveland Ozona Canyon Wasatch- Mesaverde Red Fork Mesaverde Granite Wash Stuart City-Edwards Bowdoin- Greenhorn Travis Peak Olmos Cotton Valley Vicksburg Wilcox Lobo Pictured Cliffs Cretaceous Cretaceous-Lower Tertiary Mancos- Dakota Gilmer Lime Major Tight Gas Plays, Lower 48 States

134

Williston basin Seislog study  

SciTech Connect (OSTI)

This paper describes the results of Seislog (trade name) processing and interpretation of an east-west line in the North Dakota region of the Williston basin. Seislog processing involves inversion of the seismic trace data to produce a set of synthetic sonic logs. These resulting traces, which incorporate low-frequency velocity information, are displayed in terms of depth and isotransit times. These values are contoured and colored, based on a standard stratigraphic color scheme. The section studied is located just north of a dual producing oil pool from zones in the Ordovician Red River and Devonian Duperow Formations. A sonic log from the Long Creek 1 discovery well was digitized and filtered to match the frequency content of the original seismic data. This allows direct comparison between units in the well and the pseudosonic log (Seislog) trace nearest the well. Porosity development and lithologic units within the lower Paleozoic stratigraphic section can be correlated readily between the well and Seislog traces. Anomalous velocity zones within the Duperow and Red River Formations can be observed and correlated to producing intervals in the nearby wells. These results emphasize the importance of displaying inversion products that incorporate low-frequency data in the search for hydrocarbons in the Williston basin. The accumulations in this region are local in extent and are difficult to pinpoint by using conventional seismic data or displays. Seislog processing and displays provide a tested method for identification and delineation of interval velocity anomalies in the Red River and Duperow stratigraphic sections. These techniques can significantly reduce risks in both exploration and delineation drilling of these types of targets.

Mummery, R.C.

1985-02-01T23:59:59.000Z

135

Basin-Scale Hydrologic Impacts of CO2 Storage: Regulatory and Capacity Implications  

SciTech Connect (OSTI)

Industrial-scale injection of CO{sub 2} into saline sedimentary basins will cause large-scale fluid pressurization and migration of native brines, which may affect valuable groundwater resources overlying the deep sequestration reservoirs. In this paper, we discuss how such basin-scale hydrologic impacts can (1) affect regulation of CO{sub 2} storage projects and (2) may reduce current storage capacity estimates. Our assessment arises from a hypothetical future carbon sequestration scenario in the Illinois Basin, which involves twenty individual CO{sub 2} storage projects in a core injection area suitable for long-term storage. Each project is assumed to inject five million tonnes of CO{sub 2} per year for 50 years. A regional-scale three-dimensional simulation model was developed for the Illinois Basin that captures both the local-scale CO{sub 2}-brine flow processes and the large-scale groundwater flow patterns in response to CO{sub 2} storage. The far-field pressure buildup predicted for this selected sequestration scenario suggests that (1) the area that needs to be characterized in a permitting process may comprise a very large region within the basin if reservoir pressurization is considered, and (2) permits cannot be granted on a single-site basis alone because the near- and far-field hydrologic response may be affected by interference between individual sites. Our results also support recent studies in that environmental concerns related to near-field and far-field pressure buildup may be a limiting factor on CO{sub 2} storage capacity. In other words, estimates of storage capacity, if solely based on the effective pore volume available for safe trapping of CO{sub 2}, may have to be revised based on assessments of pressure perturbations and their potential impact on caprock integrity and groundwater resources, respectively. We finally discuss some of the challenges in making reliable predictions of large-scale hydrologic impacts related to CO{sub 2} sequestration projects.

Birkholzer, J.T.; Zhou, Q.

2009-04-02T23:59:59.000Z

136

Market Power in Pollution Permit Markets  

E-Print Network [OSTI]

As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

Montero, Juan Pablo

137

Air Permitting for Stationary Sources (New Hampshire)  

Broader source: Energy.gov [DOE]

The permitting system implements the permitting requirements of RSA 125-C and 125-I to regulate the operation and modification of new and existing stationary sources, area sources, and devices to...

138

Full Permit Application Handbook | Open Energy Information  

Open Energy Info (EERE)

Full Permit Application Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Full Permit Application HandbookLegal Abstract...

139

PIA - Radiological Work Permit | Department of Energy  

Energy Savers [EERE]

Work Permit More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Occupational Medical Surveillance System (OMSS) PIA, Idaho National...

140

RPP Environmental Permits and Related Documentation  

SciTech Connect (OSTI)

This document contains the current list of environmental permits and related documentation for TWRS facilities and activities.

DEXTER, M.L.

2000-11-29T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit | Open  

Open Energy Info (EERE)

GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit GRR/Section 15-ID-b - Air Quality Permit - Tier II Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-b - Air Quality Permit - Tier II Operating Permit 15IDBAirQualityPermitTierIIOperatingPermit.pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDBAirQualityPermitTierIIOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Tier II Operating Permits are issued to facilities or stationary sources

142

Extension of Comment Period on Improving Performance of Federal Permitting  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

143

Extension of Comment Period on Improving Performance of Federal Permitting  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

144

Divergent/passive margin basins  

SciTech Connect (OSTI)

This book discusses the detailed geology of the four divergent margin basins and establishes a set of analog scenarios which can be used for future petroleum exploration. The divergent margin basins are the Campos basin of Brazil, the Gabon basin, the Niger delta, and the basins of the northwest shelf of Australia. These four petroleum basins present a wide range of stratigraphic sequences and structural styles that represent the diverse evolution of this large and important class of world petroleum basins.

Edwards, J.D. (Shell Oil Company (US)); Santogrossi, P.A. (Shell Offshore Inc. (US))

1989-01-01T23:59:59.000Z

145

GRR/Section 6-UT-b - Storm Water Permit | Open Energy Information  

Open Energy Info (EERE)

6-UT-b - Storm Water Permit 6-UT-b - Storm Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-UT-b - Storm Water Permit 06UTBStormWaterPermit.pdf Click to View Fullscreen Contact Agencies Utah Division of Water Quality Regulations & Policies Utah Water Quality Act Clean Water Act Triggers None specified Click "Edit With Form" above to add content 06UTBStormWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The construction storm water permit process is required to prevent storm water pollution. The permits are administered by the Utah Division of Water

146

GRR/Section 14-FD-a - Dredge & Fill Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-FD-a - Dredge & Fill Permit GRR/Section 14-FD-a - Dredge & Fill Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-FD-a - Dredge & Fill Permit 14FDADredgeFillOfWetlandsPermitting.pdf Click to View Fullscreen Contact Agencies U S Army Corps of Engineers United States Environmental Protection Agency Regulations & Policies Clean Water Act 33 CFR 323: Permits for Discharges of Dredged or Fill Material 33 CFR 325: Processing Dept. of Army Permits 33 CFR 327: Public Hearings Triggers None specified The Clean Water Act contains a "no net loss" policy for wetlands. If the proposed project involves the dredge or fill of any wetlands, Section 404 of the Clean Water Act requires that the project obtain a permit from the U

147

Siting & Permitting | Open Energy Information  

Open Energy Info (EERE)

Siting & Permitting Siting & Permitting Jump to: navigation, search Siting and permitting policies can facilitate the installation of clean energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar projects. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] References ↑ DSIRE Glossary Retrieved from "http://en.openei.org/w/index.php?title=Siting_%26_Permitting&oldid=538321"

148

Annual Hanford Site Environmental Permitting status report  

SciTech Connect (OSTI)

The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

SONNICHSEN, J.C.

1999-10-18T23:59:59.000Z

149

GRR/Section 15-ID-a - Air Quality Permit - Permit to Construct | Open  

Open Energy Info (EERE)

15-ID-a - Air Quality Permit - Permit to Construct 15-ID-a - Air Quality Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-ID-a - Air Quality Permit - Permit to Construct 15IDAAirQualityPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Idaho Department of Environmental Quality Regulations & Policies IDAPA 58.01.01 Triggers None specified Click "Edit With Form" above to add content 15IDAAirQualityPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Idaho Department of Environmental Quality (DEQ) requires an air quality

150

GRR/Section 15-CA-b - Air Permit - Operating Permit | Open Energy  

Open Energy Info (EERE)

15-CA-b - Air Permit - Operating Permit 15-CA-b - Air Permit - Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-CA-b - Air Permit - Operating Permit 15CABAirPermitOperatingPermit.pdf Click to View Fullscreen Contact Agencies California Air Resources Board Regulations & Policies Clean Air Act (42 USC 1857 et seq.) California Air Pollution Control Laws Triggers None specified Click "Edit With Form" above to add content 15CABAirPermitOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer operating a facility that emits air pollutants must obtain an

151

K Basins isolation barriers summary report  

SciTech Connect (OSTI)

The 105-K East and 105-K West fuel storage basins (105-K Basins) were designed and constructed in the early 1950`s for interim storage of irradiated fuel following its discharge from the reactors. The 105-K- East and 105-K West reactor buildings were constructed first, and the associated storage basins were added about a year later. The construction joint between each reactor building structure and the basin structure included a flexible membrane waterstop to prevent leakage. Water in the storage basins provided both radiation shielding and cooling to remove decay heat from stored fuel until its transfer to the Plutonium Uranium Extraction (PUREX) Facility for chemical processing. The 105-K West Reactor was permanently shut down in February 1970; the 105-K East Reactor was permanently shut down in February 1971. Except for a few loose pieces, fuel stored in the basins at that time was shipped to the PUREX Facility for processing. The basins were then left idle but were kept filled with water. The PUREX Facility was shut down and placed on wet standby in 1972 while N Reactor continued to operate. When the N Reactor fuel storage basin began to approach storage capacity, the decision was made to modify the fuel storage basins at 105-K East and 105-K West to provide additional storage capacity. Both basins were subsequently modified (105-K East in 1975 and 105-K West in 1981) to provide for the interim handling and storage of irradiated N Reactor fuel. The PUREX Facility was restarted in November 1983 to provide 1698 additional weapons-grade plutonium for the United States defense mission. The facility was shut down and deactivated in December 1992 when the U.S. Department of Energy (DOE) determined that the plant was no longer needed to support weapons-grade plutonium production. When the PUREX Facility was shut down, approximately 2.1 x 1 06 kg (2,100 metric tons) of irradiated fuel aged 7 to 23 years was left in storage in the 105-K Basins pending a decision on final disposition of the material. The Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1994), also known as the Tri-Party Agreement, commits to the removal of all fuel and sludge from the 105-K Basins by the year 2002.

Strickland, G.C., Westinghouse Hanford

1996-07-31T23:59:59.000Z

152

The WIPP Hazardous Waste Facility Permit Improvements--2007 Update  

SciTech Connect (OSTI)

The most significant changes to the Waste Isolation Pilot Plant Hazardous Waste Facility Permit to date were completed during the past year with the implementation of significant revisions to the Waste Analysis Plan and the authorization to dispose of remote-handled transuranic waste. The modified Permit removes the requirement for reporting headspace gas sampling and analysis results for every container of transuranic mixed waste and provides for the use of radiography and visual examination to confirm a statistically representative subpopulation of the waste stream in each waste shipment as well as other changes that streamline the analytical data management process. Implementation began on November 17, 2006. (authors)

Kehrman, R.; Most, W. [Washington Regulatory and Environmental Services, Carlsbad, NM (United States)

2007-07-01T23:59:59.000Z

153

Idaho DEQ Air Quality Permits Applicant and DEQ Responsibilities...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Idaho DEQ Air Quality Permits Applicant and DEQ Responsibilities guidebookPermittingRegulatory...

154

AZPDES Construction General Permit Fact Sheet | Open Energy Informatio...  

Open Energy Info (EERE)

General Permit Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: AZPDES Construction General Permit...

155

River Basin Commissions (Indiana)  

Broader source: Energy.gov [DOE]

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

156

Carderock Maneuvering & Seakeeping Basin | Open Energy Information  

Open Energy Info (EERE)

Maneuvering & Seakeeping Basin Maneuvering & Seakeeping Basin Jump to: navigation, search Basic Specifications Facility Name Carderock Maneuvering & Seakeeping Basin Overseeing Organization United States Naval Surface Warfare Center Hydrodynamic Testing Facility Type Wave Basin Length(m) 109.7 Beam(m) 73.2 Depth(m) 6.1 Water Type Freshwater Cost(per day) Contact POC Special Physical Features 10.7m deep x 15.2m wide trench along length of tank; the Maneuvering & Seakeeping Basin is spanned lengthwise by a 114.6m bridge supported on a rail system that permits the bridge to traverse one-half the width of the basin and to rotate through angles up to 45 degrees from the longitudinal centerline of the basin, ship models can be towed in head or following seas at any angle from 0 to 90 degrees, tracks attached to the bottom of the bridge support the towing carriage, bridge width is constant 6.1m.

157

Energy Generation Project Permitting (Vermont) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Generation Project Permitting (Vermont) Generation Project Permitting (Vermont) Energy Generation Project Permitting (Vermont) < Back Eligibility Construction Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Environmental Regulations Provider Agency of Natural Resources The Vermont Energy Generation Siting Policy Commission is mandated to survey best practices for siting approval of electric generation projects (all facilities except for net- and group-net-metered facilities) and for public participation and representation in the siting process, and to report to the Governor and to the Vermont Legislature on their findings by

158

Hanford facility dangerous waste permit application, general information portion  

SciTech Connect (OSTI)

The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal unit-specific Part B permit application, preclosure work plan, closure work plan, closure plan, closure/postclosure plan, or postclosure permit application documentation development, and the `Hanford Facility Resource Conservation and Recovery Act Permit` modification process. Revision 2 of the General Information Portion of the `Hanford Facility Dangerous Waste Permit Application` contains information current as of May 1, 1996. This document is a complete submittal and supersedes Revision 1.

Price, S.M., Westinghouse Hanford

1996-07-29T23:59:59.000Z

159

GRR/Section 15-TX-a - Air Permit - Permit to Construct | Open Energy  

Open Energy Info (EERE)

GRR/Section 15-TX-a - Air Permit - Permit to Construct GRR/Section 15-TX-a - Air Permit - Permit to Construct < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-TX-a - Air Permit - Permit to Construct 15TXAAirPermitPermitToConstruct (1).pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Regulations & Policies Title 30 of the Texas Administrative Code 30 TAC 116.114 30 TAC 39.418 30 TAC 39.604 30 TAC 39.605 30 TAC 39.409 30 TAC 116.136 30 TAC 55.254 30 TAC 116.136 30 TAC 116.137 Triggers None specified Click "Edit With Form" above to add content 15TXAAirPermitPermitToConstruct (1).pdf 15TXAAirPermitPermitToConstruct (1).pdf 15TXAAirPermitPermitToConstruct (1).pdf Error creating thumbnail: Page number not in range.

160

Colorado - Access Permit Application File Review Checklist |...  

Open Energy Info (EERE)

Checklist Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Application File Review Checklist Author Colorado Department of...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Catawba County- Green Construction Permitting Incentive Program  

Broader source: Energy.gov [DOE]

Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

162

Montana - Encroachment Permit Application | Open Energy Information  

Open Energy Info (EERE)

General: Montana - Encroachment Permit Application Author Montana Department of Transportation Published Montana Department of Transportation, 2007 DOI Not Provided Check for...

163

Annual Hanford Site environmental permitting status report  

SciTech Connect (OSTI)

This Annual Hanford Site Environmental Permitting Status Report (Status Report) was prepared in response to requirements prescribed in U.S. Department of Energy (DOE) Order 5400.2A, `Environmental Compliance Issue Coordination`. This Order, canceled in April 1996, required that information on existing and anticipated environmental permitting for DOE facilities be submitted (or updated) annually by October 1 of each calendar year. Although the Order was canceled, the need for this Status Report still remains. For example, the Washington State Department of Ecology`s (Ecology) Dangerous Waste Permit Application Requirements (Publication Number 95-402, June 1996), Checklist Section J, calls for current information on existing and anticipated environmental permitting. As specified in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28), this Status Report serves as the vehicle for meeting this requirement for the Hanford Facility. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by the Resource Conservation and Recovery Act (RCRA) of 1976, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) are addressed. Information on RCRA and non-RCRA permitting is included and is current as of July 31, 1996.

Thompson, S.A.

1996-10-01T23:59:59.000Z

164

Arizona Department of Environmental Quality's General Permits...  

Open Energy Info (EERE)

regarding AZPDES general permits. Author Arizona Department of Environmental Quality Published ADEQ, Date Not Provided DOI Not Provided Check for DOI availability: http:...

165

WIPP Hazardous Waste Permit - Approved Modifications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Modification to Add South Access Road for Transportation of TRU Mixed Waste dated March 17, 2011 Class 1 Permit Modification Notification to Revise TRU-Pact III Management...

166

Permitted Mercury Storage Facility Notifications | Department...  

Broader source: Energy.gov (indexed) [DOE]

Services Waste Management Waste Disposition Long-Term Management and Storage of Elemental Mercury is in the Planning Stages Permitted Mercury Storage Facility...

167

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

168

California Permit Streamlining Act | Open Energy Information  

Open Energy Info (EERE)

Streamlining Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: California Permit Streamlining ActLegal Abstract California...

169

Wastewater Construction and Operation Permits (Iowa)  

Broader source: Energy.gov [DOE]

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

170

Groundwater Discharge Permit and Registration (New Hampshire)  

Broader source: Energy.gov [DOE]

The Groundwater Discharge Permitting and Registration Program seeks to protect groundwater quality by establishing standards, criteria, and procedures for wastewater discharges. The program...

171

NPDES Permit Program Website | Open Energy Information  

Open Energy Info (EERE)

Program Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: NPDES Permit Program Website Author Environmental Protection Agency Published Publisher...

172

Hawaii Underground Injection Control Permitting Webpage | Open...  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Underground Injection Control Permitting Webpage Author State of Hawaii Department of...

173

Colorado Air Pollution Control Division - Construction Permits...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission...

174

K-Basins.pub  

Broader source: Energy.gov (indexed) [DOE]

2 2 AUDIT REPORT U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES COMPLETION OF K BASINS MILESTONES APRIL 2002 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman (Signed) Inspector General SUBJECT: INFORMATION: Audit Report on "Completion of K Basins Milestones" BACKGROUND The Department of Energy (Department) has been storing 2,100 metric tons of spent nuclear fuel at the Hanford Site in southeastern Washington. The fuel, used in support of Hanford's former mission, is currently stored in canisters that are kept in two enclosed water-filled pools known as the K Basins. The K Basins represent a significant risk to the environment due to their deteriorating condition. In fact, the K East Basin, which is near the Columbia River, has

175

Chattanooga Eagle Ford Western Gulf TX-LA-MS Salt Basin Uinta Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Western Western Gulf TX-LA-MS Salt Basin Uinta Basin Devonian (Ohio) Marcellus Utica Bakken*** Avalon- Bone Spring San Joaquin Basin Monterey Santa Maria, Ventura, Los Angeles Basins Monterey- Temblor Pearsall Tuscaloosa Big Horn Basin Denver Basin Powder River Basin Park Basin Niobrara* Mowry Niobrara* Heath** Manning Canyon Appalachian Basin Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville- Bossier Hermosa Mancos Pierre Conasauga Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Montana Thrust Belt Marfa Basin Valley & Ridge Province Arkoma Basin Forest

176

State waste discharge permit application, 200-E chemical drain field  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

Not Available

1994-06-01T23:59:59.000Z

177

GRR/Section 15-WA-b - Air Operating Permit | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 15-WA-b - Air Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-b - Air Operating Permit 15-WA-b - Air Operating Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-401-500 WAC 173-401-800 WAC 173-401-810 WAC 173-401-735 WAC 173-401-610 Triggers None specified This flowchart illustrates the process for obtaining an Air Operating Permit in Washington State. The Washington State Department of Ecology (WSDE) issues Air Operating Permit under WAC 173-401. An Air Operating Permit is required if a facility has the potential to emit

178

THE ADVANCED CHEMISTRY BASINS PROJECT  

SciTech Connect (OSTI)

In the next decades, oil exploration by majors and independents will increasingly be in remote, inaccessible areas, or in areas where there has been extensive shallow exploration but deeper exploration potential may remain; areas where the collection of data is expensive, difficult, or even impossible, and where the most efficient use of existing data can drive the economics of the target. The ability to read hydrocarbon chemistry in terms of subsurface migration processes by relating it to the evolution of the basin and fluid migration is perhaps the single technological capability that could most improve our ability to explore effectively because it would allow us to use a vast store of existing or easily collected chemical data to determine the major migration pathways in a basin and to determine if there is deep exploration potential. To this end a the DOE funded a joint effort between California Institute of Technology, Cornell University, and GeoGroup Inc. to assemble a representative set of maturity and maturation kinetic models and develop an advanced basin model able to predict the chemistry of hydrocarbons in a basin from this input data. The four year project is now completed and has produced set of public domain maturity indicator and maturation kinetic data set, an oil chemistry and flash calculation tool operable under Excel, and a user friendly, graphically intuitive basin model that uses this data and flash tool, operates on a PC, and simulates hydrocarbon generation and migration and the chemical changes that can occur during migration (such as phase separation and gas washing). The DOE Advanced Chemistry Basin Model includes a number of new methods that represent advances over current technology. The model is built around the concept of handling arbitrarily detailed chemical composition of fluids in a robust finite-element 2-D grid. There are three themes on which the model focuses: chemical kinetic and equilibrium reaction parameters, chemical phase equilibrium, and physical flow through porous media. The chemical kinetic scheme includes thermal indicators including vitrinite, sterane ratios, hopane ratios, and diamonoids; and a user-modifiable reaction network for primary and secondary maturation. Also provided is a database of type-specific kerogen maturation schemes. The phase equilibrium scheme includes modules for primary and secondary migration, multi-phase equilibrium (flash) calculations, and viscosity predictions.

William Goddard; Peter Meulbroek; Yongchun Tang; Lawrence Cathles III

2004-04-05T23:59:59.000Z

179

MCA 75-5-401 - Water Quality Permits: Board Rules for Permits...  

Open Energy Info (EERE)

- Water Quality Permits: Board Rules for Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: MCA 75-5-401 - Water Quality...

180

Coordinating Permit Office | OpenEI Community  

Open Energy Info (EERE)

Coordinating Permit Office Coordinating Permit Office Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand Sierra Resort in Reno, NV. The meeting was well-attended with over 40 attendees, including in-person and webinar attendance. Thanks to all who attended! Files: application/pdf icon Presentation: 3rd Quarterly Stakeholder Update Meeting application/vnd.openxmlformats-officedocument.presentationml.presentation icon Mock-up: GRR Permitting Wizard Interface Kyoung's picture Submitted by Kyoung(155)

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Operating Permits (New Jersey) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operating Permits (New Jersey) Operating Permits (New Jersey) Operating Permits (New Jersey) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State New Jersey Program Type Siting and Permitting Provider Department of Environmental Protection The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure that no person shall use or

182

HQ Work Control Permit | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.10 Barriers and Postings 5/26/95 OSS 19.3 Confined Space Entry 5/23/95

183

Solar Construction Permitting Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Standards Standards Solar Construction Permitting Standards < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Local Government Nonprofit Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Colorado Energy Office Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities have been free to assign their own fees for a permit. These fees can vary broadly in size across jurisdictions and in some cases, can be large enough

184

HQ Work Control Permit | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

HQ Work Control Permit HQ Work Control Permit HQ Work Control Permit To ensure safe operations when undertaking work at DOE Headquarters, the Office of Headquarters Health and Safety has developed a Work Permit document (doc) to help ensure the safety of all workers and headquarters employees. The form should be completed and brought to the Office of Headquarters Safety, Health and Security office at GE-112 at the Forrestal facility, or the Germantown Building Manager's office at E-076 for review and sign off. Any questions can be directed to the HQ Health and Safety office on (202) 586-1005. HQ_Work_Control_Permit.docx More Documents & Publications Preliminary Notice of Violation, Petsco and Son, Inc - EA-96-06 OSS 19.3 Confined Space Entry 5/23/95 WA_02_026_UNITED_TECHNOLOGIES_Waiver_of_Domestic_and_Foreign

185

Application of a Least Square Non-parametric Discovery Process Model to Colorado Group Mixed Conventional and Unconventional Oil Plays, Western Canada Sedimentary Basin  

Science Journals Connector (OSTI)

A least squares non-parametric discovery process model has been developed recently for assessing petroleum resources in mature plays with complex size distribution characteristics. Applications of this model to o...

Zhuoheng Chen; Kirk G. Osadetz; Gemai Chen

2014-01-01T23:59:59.000Z

186

Gravity-driven structures and rift basin evolution: Rio Muni Basin, offshore equatorial West Africa  

SciTech Connect (OSTI)

Offshore Equatorial Guinea, west Africa, gravity-driven nappes, more than 1 km thick and 15 km from head to toe, provide key evidence in reconstructing the late synrift: evolution of this part of the South Atlantic margin basin system. Furthermore, Aptian-Cenomanian carbonate and clastic rocks in the nappes` allochthonous hanging walls are attracting interest as a new exploration play in west Africa. The nappes exhibit a range of geometries that suggest they share many of the same deformation processes as thin-skin thrust and linked extensional fault systems. Not only are these structures significant in their own right, representing a rare example of gravity tectonics in the virtual absence of major halokinesis, but their presence may record an other-wise undetectable process active during the transition from a rift basin to a passive continental margin. A review of Equatorial Guinea in its pre-Atlantic configuration, alongside neighboring basins in Brazil (the Sergipe-Alagoas basin) and Gabon, suggests that gravity gliding was sustained by a relatively steep, westward paleoslope promoted by east-ward offset of the locus of thermal uplift from the rift basin (i.e., a simple shear model of basin formation). In contrast to gravity-driven structures in most postrift settings, the Equatorial Guinea nappes developed at the close of the Aptian-Albian synrift episode in response to a growing bathymetric deep caused by rapid subsidence outpacing restricted sedimentation.

Turner, J.P. [Univ. of Birmingham (United Kingdom)

1995-08-01T23:59:59.000Z

187

Hanford facility dangerous waste permit application, 616 Nonradioactive Dangerous Waste Storage Facility. Revision 2A  

SciTech Connect (OSTI)

This permit application for the 616 Nonradioactive Dangerous Waste Storage Facility consists for 15 chapters. Topics of discussion include the following: facility description and general provisions; waste characteristics; process information; personnel training; reporting and record keeping; and certification.

Bowman, R.C.

1994-04-01T23:59:59.000Z

188

The collision of Title III and Title V: A potential permitting and enforcement nightmare  

SciTech Connect (OSTI)

The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

Facca, G.; Faler, M.

1998-12-31T23:59:59.000Z

189

Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)  

SciTech Connect (OSTI)

Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

Levine, A.; Young, K.; Witherbee, K.

2013-10-01T23:59:59.000Z

190

State Surface Water Discharge Permits (New Hampshire)  

Broader source: Energy.gov [DOE]

Rules apply to the discharge of all pollutants from a point source to surface waters of the state. The rule does not apply to facilities that require both a state discharge permit and a federal...

191

Regulations and Permits Related to Dams (Vermont)  

Broader source: Energy.gov [DOE]

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

192

Reclamation permit application handbook. Final technical report  

SciTech Connect (OSTI)

The objective of this handbook is to provide Appalachian surface coal mine operators with an explanation of the Office of Surface Mining's (OSM) permanent regulatory program permit application requirements. The format of the handbook is designed to give the reader an understanding of how the permit application regulations were developed, the number of subjects the application must cover, the work entailed in satisfying the permit requirements, and sources of information for more technical studies. Preparation of the handbook involved reviewing the OSM regulations and devising a hypothetical permit, incorporating information required by all the sections of the regulations. The outlines and drafts of the handbook were reviewed by mine operators, OSM, and State agencies for completeness, and to ensure that the maximum benefit would be derived by using such a handbook.

Myers, L.L.; Calvert, R.P.

1981-06-01T23:59:59.000Z

193

Disclosure of Permitted Communication Concerning Fossil Fuel...  

Energy Savers [EERE]

Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Disclosure of Permitted...

194

Disclosure of Permitted Communication Concerning Regional Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disclosure of Permitted Communication Concerning Regional Standards Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No. EERE-2011-BT-CE-0077 Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No. EERE-2011-BT-CE-0077 This memo provides an overview of communications made to DOE staff on the subject of a policy for providing waivers from new regional furnace efficiency standards. memo_furnace_std_waiver_policy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Record of Communication Concerning Ceiling Fan and Ceiling Fan Light Kit

195

The impact of BASIN-scale oceanographic and climate-related processes on the dynamics of key plankton and fish populations in the North  

E-Print Network [OSTI]

plankton and fish populations in the North Atlantic ocean: Analysis, integration, synthesis and modelling-scale oceanographic and climate-related processes on the dynamics of key plankton and fish populations in the North 1997. No. 8. Report of the first planning meeting on Small Pelagic Fishes and Climate Change Program

deYoung, Brad

196

Major Source Permits (District of Columbia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Major Source Permits (District of Columbia) Major Source Permits (District of Columbia) Major Source Permits (District of Columbia) < Back Eligibility Utility Commercial Industrial Program Info State District of Columbia Program Type Environmental Regulations Provider District Department of the Environment The District reviews designs for new pollution sources and design modifications for existing sources. Permits are issued to allow sources to emit limited and specified amounts of pollution as allowed by air quality laws and regulations. Major sources include power plants, heating plants, and large printing facilities. Three types of permits are issued: pre-construction review permits; new source review permits; and operating permits. These permits include conditions intended to minimize emissions of

197

Public invited to comment on additional proposed modications to WIPP hazardous waste permit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Public Invited to Comment on Additional Proposed Modifications Public Invited to Comment on Additional Proposed Modifications To WIPP Hazardous Waste Permit CARLSBAD, N.M., April 26, 2000 - The public is invited to comment on additional proposed modifications to the hazardous waste facility permit for the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Earlier this month, DOE and the Westinghouse Waste Isolation Division requested -- through three Class 2 permit modification submittals -- that the New Mexico Environment Department (NMED) change certain provisions of the state permit. On April 20, DOE and Westinghouse submitted to NMED three additional Class 2 permit modifications. The Class 2 submittals begin a formal review process that includes a 60-day public comment period and two separate public meetings. Written comments will be accepted by

198

E-Print Network 3.0 - aral sea basin Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project description... -depositional systems were a major factor controlling the post-Permian basin history of the southern North Sea. Seismic... processes in the post-Permian...

199

DOE to Hold Public Information Meetings On Proposed Permit Modification  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Meeting Meeting On Proposed Permit Modification CARLSBAD, N.M., January 31, 2001 - The public is invited to comment on a proposed modification to the Hazardous Waste Facility Permit for the Waste Isolation Pilot Plant (WIPP). Submittal of the proposed modification to the New Mexico Environment Department (NMED) by the U.S. Department of Energy (DOE) begins a formal review process that includes a 60-day public comment period and a public information meeting. In its request, DOE proposes alternative methods of quality control for radiography, which is currently done through visual examination. The proposed alternative is Digital Radiography/Computed Tomography. The modification would allow DOE to take advantage of new technology that enables analysis of the contents of

200

Request for Information on Improving Performance of Federal Permitting and  

Broader source: Energy.gov (indexed) [DOE]

Information on Improving Performance of Federal Information on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 The Department of Energy's Office of Electricity Delivery and Energy Reliability, in collaboration with the Member Agencies of the Steering Committee (Member Agencies) created under Executive Order 13604 of March 22, 2012, and pursuant to the June 7, 2013 Transmission Presidential Memorandum, is seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal Authorization(s).

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

State Waste Discharge Permit ST-4502 Implementation Plan  

SciTech Connect (OSTI)

Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

BROWN, M.J.; LECLAIR, M.D.

2000-09-27T23:59:59.000Z

202

EPA Region 6 NPDES General Permits | Open Energy Information  

Open Energy Info (EERE)

NPDES General Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA Region 6 NPDES General Permits Abstract Access to NPDES General Permits for...

203

Introduction to Coast Guard Bridge Permitting | Open Energy Informatio...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Introduction to Coast Guard Bridge PermittingPermittingRegulatory GuidanceGuide...

204

EPA - Construction General Permit Fact Sheet | Open Energy Information  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: EPA - Construction General Permit Fact SheetPermittingRegulatory GuidanceGuide...

205

ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...  

Open Energy Info (EERE)

use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

206

ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...  

Open Energy Info (EERE)

use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

207

Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings  

SciTech Connect (OSTI)

Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

1995-12-31T23:59:59.000Z

208

Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying  

Broader source: Energy.gov (indexed) [DOE]

K Basin and Cold Vacuum K Basin and Cold Vacuum Drying Facility - August 2012 Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 August 2012 Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations The purpose of this independent oversight review by the U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS) was to observe the operations associated with processing a Multi-Canister Overpack (MCO) of "found fuel" (small quantities of spent fuel discovered during cleanup of the reactor burial grounds) at the Cold Vacuum Drying Facility (CVDF). The found fuel MCO was transported from the K West Basin on the Hanford

209

Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying  

Broader source: Energy.gov (indexed) [DOE]

Hanford K Basin and Cold Vacuum Hanford K Basin and Cold Vacuum Drying Facility - August 2012 Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 August 2012 Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations The purpose of this independent oversight review by the U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS) was to observe the operations associated with processing a Multi-Canister Overpack (MCO) of "found fuel" (small quantities of spent fuel discovered during cleanup of the reactor burial grounds) at the Cold Vacuum Drying Facility (CVDF). The found fuel MCO was transported from the K West Basin on the Hanford

210

Utah Underground Storage Tank Installation Permit | Open Energy...  

Open Energy Info (EERE)

Underground Storage Tank Installation Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Utah Underground Storage Tank Installation Permit Form Type...

211

Alaska Special Area Permit Application | Open Energy Information  

Open Energy Info (EERE)

Form: Alaska Special Area Permit Application Form Type ApplicationNotice Form Topic Fish and Game Special Area Permit Application Organization Alaska Department of Fish and...

212

Alaska Fish Habitat Permit Application | Open Energy Information  

Open Energy Info (EERE)

Form: Alaska Fish Habitat Permit Application Form Type ApplicationNotice Form Topic Fish Habitat Permit Organization Alaska Department of Fish and Game Published Publisher Not...

213

Arizona State Land Department Applications and Permits Website...  

Open Energy Info (EERE)

Permits Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Arizona State Land Department Applications and Permits Website Abstract This website...

214

BLM - Paleontological Resource Use Permits webpage | Open Energy...  

Open Energy Info (EERE)

Use Permits webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM - Paleontological Resource Use Permits webpage Abstract This webpage provides...

215

Idaho DEQ Waste Management and Permitting Webpage | Open Energy...  

Open Energy Info (EERE)

Permitting Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho DEQ Waste Management and Permitting Webpage Abstract This webpage provides...

216

Application for presidential permit OE Docket No. PP-234 Baja...  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-234 Baja California Power, Inc Application for presidential permit OE Docket No. PP-234 Baja California Power, Inc Application from Baja...

217

Air Quality Approvals and Permits (New Brunswick, Canada) | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Approvals and Permits (New Brunswick, Canada) Air Quality Approvals and Permits (New Brunswick, Canada) < Back Eligibility Commercial Construction Developer Industrial Installer...

218

Fact Sheet - Air Quality Permitting | Open Energy Information  

Open Energy Info (EERE)

Air Quality Permitting Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Fact Sheet - Air Quality...

219

Hydrogen Codes and Standards and Permitting | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Codes and Standards and Permitting Hydrogen Codes and Standards and Permitting 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

220

WSDE Report: Wastewater Discharge Permits in Washington State...  

Open Energy Info (EERE)

Wastewater Discharge Permits in Washington State Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: WSDE Report: Wastewater Discharge Permits in Washington...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Request for Information on Permitting of Transmission Lines:...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

222

Guide to Permitting Electric Transmission Lines in Wyoming |...  

Open Energy Info (EERE)

Permitting Electric Transmission Lines in Wyoming Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Guide to...

223

EPA - Permit Compliance System webpage | Open Energy Information  

Open Energy Info (EERE)

System webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Permit Compliance System webpage Abstract This webpage contains EPA's Permit...

224

U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...  

Broader source: Energy.gov (indexed) [DOE]

2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

225

Construction and Minor Permit Applications | Open Energy Information  

Open Energy Info (EERE)

Permit Applications Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Construction and Minor Permit Applications Author Division of Air Quality...

226

New Mexico Archaeological Permits Webpage | Open Energy Information  

Open Energy Info (EERE)

Permits Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: New Mexico Archaeological Permits Webpage Abstract Provides information about...

227

EPA - Section 404 Dredge and Fill Permitting webpage | Open Energy...  

Open Energy Info (EERE)

Permitting webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Section 404 Dredge and Fill Permitting webpage Abstract This webpage...

228

Hawaii Permit Application for Solid Waste Management Facility...  

Open Energy Info (EERE)

to receive a permit for a solid waste management facility. Form Type CertificateForm of Completion Form Topic Permit Application for Solid Waste Management Facility Organization...

229

Hawaii Clean Energy Initiative - Transmission Line Approval Permit...  

Open Energy Info (EERE)

Hawaii Clean Energy Initiative - Transmission Line Approval Permit Packet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

230

Guide to Colorado Well Permits, Water Rights, and Water Administration...  

Open Energy Info (EERE)

Colorado Well Permits, Water Rights, and Water Administration Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

231

Westinghouse and Fuzhou Permitted to Restart Distribution of...  

Broader source: Energy.gov (indexed) [DOE]

Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products August 6, 2010 -...

232

Property:ExplorationPermit-Drilling | Open Energy Information  

Open Energy Info (EERE)

without first obtaining a permit issued under the authority of the State Department of Geology and Mineral Industries and without complying with the conditions of such permit....

233

AUTHORIZATION FOR PAYROLL DEDUCTION 2012-2013 PARKING PERMIT  

E-Print Network [OSTI]

________________________________________________ DATE______________________________ $267.00 (ONE PERMIT) $66.00 (MOTORCYCLE PERMIT) $267.00 (TOTAL MONTH____________ OPTION FOR MOTORCYCLE DEDUCTION--1 MONTH______________ PLEASE INCLUDE YOUR CAMPUS

Escher, Christine

234

Hanford facility dangerous waste permit application  

SciTech Connect (OSTI)

This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

none,

1991-09-18T23:59:59.000Z

235

Underground Injection Control Permits and Registrations (Texas) |  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Underground Injection Control Permits and Registrations (Texas) Underground Injection Control Permits and Registrations (Texas) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Fuel Distributor Savings Category Buying & Making Electricity Program Info State Texas Program Type Environmental Regulations Safety and Operational Guidelines Provider Texas Commission on Environmental Quality Chapter 27 of the Texas Water Code (the Injection Well Act) defines an "injection well" as "an artificial excavation or opening in the ground made by digging, boring, drilling, jetting, driving, or some other

236

System Description for the KW Basin Integrated Water Treatment System (IWTS) (70.3)  

SciTech Connect (OSTI)

This is a description of the system that collects and processes the sludge and radioactive ions released by the spent nuclear fuel (SNF) processing operations conducted in the 105 KW Basin. The system screens, settles, filters, and conditions the basin water for reuse. Sludge and most radioactive ions are removed before the water is distributed back to the basin pool. This system is part of the Spent Nuclear Fuel Project (SNFP).

DERUSSEAU, R.R.

2000-04-18T23:59:59.000Z

237

Estimating tectonic history through basin simulation-enhanced seismic inversion: geoinfomatics for sedimentary basins  

Science Journals Connector (OSTI)

......processes in response to geothermal gradient in much greater...approach not only reduces costs by integrating the basin...terms of temperature, energy, and with the probability...accepting a change in energy given through Boltzmann...proceeded in our choice of geothermal gradients (coarser......

Kush Tandon; Kagan Tuncay; Kyle Hubbard; John Comer; Peter Ortoleva

2004-01-01T23:59:59.000Z

238

EFFECTIVE ENVIRONMENTAL COMPLIANCE STRATEGY FOR THE CLEANUP OF K BASINS AT HANFORD SITE WASHINGTON  

SciTech Connect (OSTI)

K Basins, consisting of two water-filled storage basins (KW and KE) for spent nuclear fuel (SNF), are part of the 100-K Area of the Hanford Site, along the shoreline of the Columbia River, situated approximately 40 km (25 miles) northwest of the City of Richland, Washington. The KW contained 964 metric tons of SNF in sealed canisters and the KE contained 1152 metric tons of SNF under water in open canisters. The cladding on much of the fuel was damaged allowing the fuel to corrode and degrade during storage underwater. An estimated 1,700 cubic feet of sludge, containing radionuclides and sediments, have accumulated in the KE basin. Various alternatives for removing and processing the SNF, sludge, debris and water were originally evaluated, by USDOE (DOE), in the Environmental Impact Statement (EIS) with a preferred alternative identified in the Record of Decision. The SNF, sludge, debris and water are ''hazardous substances'' under the Comprehensive, Environmental, Response, Compensation and Liability Act of 1980 (CERCLA). Leakage of radiologically contaminated water from one of the basins and subsequent detection of increased contamination in a down-gradient monitoring well helped to form the regulatory bases for cleanup action under CERCLA. The realization that actual or threatened release of hazardous substances from the waste sites and K Basins, if not addressed in a timely manner, may present an imminent and substantial endangerment to public health, welfare and environment led to action under CERCLA, with EPA as the lead regulatory agency. Clean-up of the K Basins as a CERCLA site required SNF retrieval, processing, packaging, vacuum drying and transport to a vaulted storage facility for storage, in conformance with a quality assurance program approved by the Office of Civilian Radioactive Waste Management (OCRWM). Excluding the facilities built for SNF drying and vaulted storage, the scope of CERCLA interim remedial action was limited to the removal of fuel, sludge, debris and water. At present, almost all of the spent fuel has been removed from the basins and other activities to remove sludge, debris and water are scheduled to be completed in 2007. Developing environmental documentation and obtaining regulatory approvals for a project which was initiated outside CERCLA and came under CERCLA during execution, was a significant priority to the successful completion of the SNF retrieval, transfer, drying, transport and storage of fuel, within the purview of strong conduct-of-operations culture associated with nuclear facilities. Environmental requirements promulgated in the state regulations by Washington Department of Public Health for radiation were recognized as ''applicable or relevant and appropriate.'' Effective implementation of the environmental compliance strategy in a project that transitioned to CERCLA became a significant challenge involving multiple contractors. This paper provides an overview of the development and implementation of an environmental permitting and surveillance strategy that enabled us to achieve full compliance in a challenging environment, with milestones and cost constraints, while meeting the high safety standards. The details of the strategy as to how continuous rapport with the regulators, facility operators and surveillance groups helped to avoid impacts on the clean-up schedule are discussed. Highlighted are the role of engineered controls, surveillance protocols and triggers for monitoring and reporting, and active administrative controls that were established for the control of emissions, water loss and transport of waste shipments, during the different phases of the project.

AMBALAM, T.

2004-12-01T23:59:59.000Z

239

Permitting of Wind Energy Facilities: A Handbook  

SciTech Connect (OSTI)

This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

NWCC Siting Work Group

2002-08-01T23:59:59.000Z

240

UCSF Bicycle Permit Application Transportation Services  

E-Print Network [OSTI]

UCSF Bicycle Permit Application Transportation Services 500 Parnassus Ave, Box 0240 MU- P7 Room 26 ____________________________________________________________________ ____________________________ ______________________________ ____________________________________________________________________ Street City State Zip Home Phone Number Work Phone Number Bicycle Make Color Frame Serial #Bicycle Model 1. Bicycles which are not moved for a period of 7 days or longer will be tagged for removal

Yamamoto, Keith

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data Basin | Open Energy Information  

Open Energy Info (EERE)

Data Basin Data Basin Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Data Basin Agency/Company /Organization: Conservation Biology Institute Topics: GHG inventory Resource Type: Dataset, Maps Website: databasin.org/ Data Basin Screenshot References: Data Basin [1] Overview "Data Basin is an innovative, online system that connects users with spatial datasets, tools, and expertise. Individuals and organization can explore and download a vast library of datasets, upload their own data, create and publish projects, form working groups, and produce customized maps that can be easily shared. The building blocks of Data Basin are: Datasets: A dataset is a spatially explicit file, currently Arcshape and ArcGrid files. These can be biological, physical, socioeconomic, (and

242

Enforcing Emissions Trading when Emissions Permits are Bankable  

Science Journals Connector (OSTI)

We propose enforcement strategies for emissions trading programs with bankable emissions permits that guarantee...

John K. Stranlund; Christopher Costello

2005-09-01T23:59:59.000Z

243

Alternative Fuels Data Center: Biofuels Construction and Permitting  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biofuels Construction Biofuels Construction and Permitting Assistance to someone by E-mail Share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Facebook Tweet about Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Twitter Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Google Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Delicious Rank Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Digg Find More places to share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

244

Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Hydrogen Fueling Hydrogen Fueling Infrastructure Permitting and Safety to someone by E-mail Share Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Facebook Tweet about Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Twitter Bookmark Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Google Bookmark Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Delicious Rank Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on Digg Find More places to share Alternative Fuels Data Center: Hydrogen Fueling Infrastructure Permitting and Safety on AddThis.com... More in this section... Federal State Advanced Search

245

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Broader source: Energy.gov (indexed) [DOE]

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

246

EA-64 Basin Electric Power Cooperative | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Basin Electric Power Cooperative EA-64 Basin Electric Power Cooperative Order authorizing Basin Electric Power Cooperative to export electric energy to Canada EA-64 Basin Electric...

247

The geochemistry of uranium in the Orca Basin  

E-Print Network [OSTI]

inhibit=. vertical mixing between basin brine and overlying seawater. This severely limits the transport of hexa- valent uranium across this boundary. Second, the major depositional process in the basin is mass transport of sediments from... The continuing growth of nuclear power combined with the steady depletion of existing high-grade uranium ore has brought about an increase in the use of and search for lower-grade uranium deposits. According to Lieberman (1976), there is little undiscovered...

Weber, Frederick Fewell

2012-06-07T23:59:59.000Z

248

GRR/Section 14-HI-b - NPDES Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 14-HI-b - NPDES Permit GRR/Section 14-HI-b - NPDES Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-HI-b - NPDES Permit 14HIBStateCleanWaterActProcess.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Health Clean Water Branch Regulations & Policies Hawaii Administrative Rules Chapter 11-55 Triggers None specified Click "Edit With Form" above to add content 14HIBStateCleanWaterActProcess.pdf 14HIBStateCleanWaterActProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative State Clean Water Act Process Clean water act approval is needed to engage in any activity that might materially alter the surrounding water supply, or to operate a facility

249

K Basin sludge dissolution engineering study  

SciTech Connect (OSTI)

The purpose of this engineering study is to investigate the available technology related to dissolution of the K Basin sludge in nitric acid. The conclusion of this study along with laboratory and hot cell tests with actual sludge samples will provide the basis for beginning conceptual design of the sludge dissolver. The K Basin sludge contains uranium oxides, fragments of metallic U, and some U hydride as well as ferric oxyhydroxide, aluminum oxides and hydroxides, windblown sand that infiltrated the basin enclosure, ion exchange resin, and miscellaneous materials. The decision has been made to dispose of this sludge separate from the fuel elements stored in the basins. The sludge will be conditioned so that it meets Tank Waste Remediation System waste acceptance criteria and can be sent to one of the underground storage tanks. Sludge conditioning will be done by dissolving the fuel constituents in nitric acid, separating the insoluble material, adding neutron absorbers for criticality safety, and then reacting the solution with caustic to co-precipitate the uranium and plutonium. There will be five distinct feed streams to the sludge conditioning process two from the K East (KE) Basin and three from the K West (KW) Basin. The composition of the floor and pit sludges which contain more iron oxides and sand than uranium is much different than the canister sludges which are composed of mostly uranium oxides. The sludge conditioning equipment will be designed to process all of the sludge streams, but some of the operating parameters will be adjusted as necessary to handle the different sludge stream compositions. The volume of chemical additions and the amount of undissolved solids will be much different for floor and pit sludge than for canister sludge. Dissolution of uranium metal and uranium dioxide has been studied quite thoroughly and much information is available. Both uranium metal and uranium dioxide have been dissolved on a large scale in nuclear fuel reprocessing plants in Europe, Japan, and the USA. Ash and sludge containing uranium compounds also have been dissolved in reprocessing or plutonium scrap recovery plants, but only a limited amount of information is available on how the ferric oxyhydroxide, aluminum compounds and silicates in the sand will behave during nitric acid dissolution. Laboratory work with simulants and hot cell work with actual K Basin sludge is in progress to obtain data in these areas.

Westra, A.G.

1998-08-28T23:59:59.000Z

250

Hawaii Integrated Energy Assessment. Volume V. Rules, regulations, permits and policies affecting the development of alternate energy sources in Hawaii  

SciTech Connect (OSTI)

A comprehensive presentaton of the major permits, regulations, rules, and controls which are likely to affect the development of alternate energy sources in Hawaii is presented. An overview of the permit process, showing the major categories and types of permits and controls for energy alternatives is presented. This is followed by a brief resume of current and projected changes designed to streamline the permit process. The permits, laws, regulations, and controls that are applicable to the development of energy alternatives in Hawaii are described. The alternate energy technologies affected, a description of the permit or control, and the requirements for conformance are presented for each applicable permit. Federal, state, and county permits and controls are covered. The individual energy technologies being considered as alternatives to the State's present dependence on imported fossil fuels are emphasized. The alternate energy sources covered are bioconversion, geothermal, ocean thermal, wind, solar (direct), and solid waste. For each energy alternative, the significant permits are summarized with a brief explanation of why they may be necessary. The framework of policy development at each of the levels of government with respect to the alternate energy sources is covered.

Not Available

1980-01-01T23:59:59.000Z

251

ADVANCED CHEMISTRY BASINS MODEL  

SciTech Connect (OSTI)

The advanced Chemistry Basin Model project has been operative for 48 months. During this period, about half the project tasks are on projected schedule. On average the project is somewhat behind schedule (90%). Unanticipated issues are causing model integration to take longer then scheduled, delaying final debugging and manual development. It is anticipated that a short extension will be required to fulfill all contract obligations.

William Goddard III; Lawrence Cathles III; Mario Blanco; Paul Manhardt; Peter Meulbroek; Yongchun Tang

2004-05-01T23:59:59.000Z

252

Petroleum basin studies  

SciTech Connect (OSTI)

This book reviews the tectonic setting, basin development and history of exploration of a number of selected petroleum provinces located in a variety of settings in the Middle East, North Sea, Nigeria, the Rocky Mountains, Gabon and China. This book illustrates how ideas and models developed in one area may be applied to other regions. Regional reviews and the reassessment of petroleum provinces are presented.

Shannon, P.M. (Univ. College, Dublin (IE)); Naylor, D. (Westland Exploration Ltd., Dublin (IE))

1989-01-01T23:59:59.000Z

253

Caribbean basin framework, 3: Southern Central America and Colombian basin  

SciTech Connect (OSTI)

The authors recognize three basin-forming periods in southern Central America (Panama, Costa Rica, southern Nicaragua) that they attempt to correlate with events in the Colombian basin (Bowland, 1984): (1) Early-Late Cretaceous island arc formation and growth of the Central American island arc and Late Cretaceous formation of the Colombian basin oceanic plateau. During latest Cretaceous time, pelagic carbonate sediments blanketed the Central American island arc in Panama and Costa Rica and elevated blocks on the Colombian basin oceanic plateau; (2) middle Eocene-middle Miocene island arc uplift and erosion. During this interval, influx of distal terrigenous turbidites in most areas of Panama, Costa Rica, and the Colombian basin marks the uplift and erosion of the Central American island arc. In the Colombian basin, turbidites fill in basement relief and accumulate to thicknesses up to 2 km in the deepest part of the basin. In Costa Rica, sedimentation was concentrated in fore-arc (Terraba) and back-arc (El Limon) basins; (3) late Miocene-Recent accelerated uplift and erosion of segments of the Central American arc. Influx of proximal terrigenous turbidites and alluvial fans in most areas of Panama, Costa Rica, and the Colombian basin marks collision of the Panama arc with the South American continent (late Miocene early Pliocene) and collision of the Cocos Ridge with the Costa Rican arc (late Pleistocene). The Cocos Ridge collision inverted the Terraba and El Limon basins. The Panama arc collision produced northeast-striking left-lateral strike-slip faults and fault-related basins throughout Panama as Panama moved northwest over the Colombian basin.

Kolarsky, R.A.; Mann, P. (Univ. of Texas, Austin (United States))

1991-03-01T23:59:59.000Z

254

GRR/Elements/14-CA-b.1 - NPDES Permit Application | Open Energy Information  

Open Energy Info (EERE)

GRR/Elements/14-CA-b.1 - NPDES Permit Application GRR/Elements/14-CA-b.1 - NPDES Permit Application < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-b.1 - NPDES Permit Application The National Pollutant Discharge Elimination System permit is filed using a Form 200 for discharges of any pollutant from a point source into a body of water. The application is submitted to the applicable RWQCB. Because there is a federal component of the NPDES process one or more additional forms may be required: Form 1 General information completed in conjunction with Forms 2B, 2C, 2D, 2E, 2F, Standard Form 2A Form 2A Publicly-Owned Treatment Works Form 2B Concentrated animal feeding operations and aquatic animal production facilities. New applications or renewals

255

Hanford Site air operating permit application  

SciTech Connect (OSTI)

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

256

Refinishing contamination floors in Spent Nuclear Fuels storage basins  

SciTech Connect (OSTI)

The floors of the K Basins at the Hanford Site are refinished to make decontamination easier if spills occur as the spent nuclear fuel (SNF) is being unloaded from the basins for shipment to dry storage. Without removing the contaminated existing coating, the basin floors are to be coated with an epoxy coating material selected on the basis of the results of field tests of several paint products. The floor refinishing activities must be reviewed by a management review board to ensure that work can be performed in a controlled manner. Major documents prepared for management board review include a report on maintaining radiation exposure as low as reasonably achievable, a waste management plan, and reports on hazard classification and unreviewed safety questions. To protect personnel working in the radiation zone, Operational Health Physics prescribed the required minimum protective methods and devices in the radiological work permit. Also, industrial hygiene safety must be analyzed to establish respirator requirements for persons working in the basins. The procedure and requirements for the refinishing work are detailed in a work package approved by all safety engineers. After the refinishing work is completed, waste materials generated from the refinishing work must be disposed of according to the waste management plan.

Huang, F.F.; Moore, F.W.

1997-07-11T23:59:59.000Z

257

Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compressed Natural Gas Compressed Natural Gas (CNG) Permit to someone by E-mail Share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Facebook Tweet about Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Twitter Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Google Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Delicious Rank Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on Digg Find More places to share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Compressed Natural Gas (CNG) Permit Anyone dispensing CNG for use in vehicles must obtain a permit from the

258

Susquehanna River Basin Compact (Maryland)  

Broader source: Energy.gov [DOE]

This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

259

Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) |  

Broader source: Energy.gov (indexed) [DOE]

Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) Chapter 52 Permits, Registrations, and Prohibitory Rules (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Kentucky Program Type Environmental Regulations Siting and Permitting Provider Kentucky Department for Environmental Protection Kentucky Administrative Regulation Chapter 52, entitled Air Quality: Permits, Registrations, and Prohibitory Rules, is promulgated under the authority of the Division of Air Quality within the Energy and Environment Cabinet's Department for Environmental Protection. Chapter 52 outlines the permitting requirements for all air pollution sources within the state;

260

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) | Department  

Broader source: Energy.gov (indexed) [DOE]

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) Petroleum Pipeline Eminent Domain Permit Procedures (Georgia) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Investor-Owned Utility Municipal/Public Utility Utility Program Info State Georgia Program Type Environmental Regulations Siting and Permitting Provider Georgia Department of Natural Resources The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection Division prior to any petroleum or petroleum product pipe company acquiring property or interests by eminent domain. Monitoring conditions will be issued with

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

General Conditions Applicable to Water Discharge Permits and Procedures and  

Broader source: Energy.gov (indexed) [DOE]

General Conditions Applicable to Water Discharge Permits and General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut) General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection

262

California Basin Studies (CaBS). Final contract report  

SciTech Connect (OSTI)

The California Continental Borderland`s present configuration dates from about 4 to 5 X 10{sup 6} years Before Present (B.P.) and is the most recent of several configurations of the southern California margin that have evolved after the North America Plate over-rode the East Pacific Rise about 30 X 10{sup 6} years ago. The present morphology is a series of two to three northwest-southeast trending rows of depressions separated by banks and insular ridges. Two inner basins, Santa Monica and San Pedro, have been the site for the Department of Energy-funded California Basin Study (CaBS) Santa Monica and San Pedro Basins contain post-Miocene sediment thicknesses of about 2.5 and 1.5 km respectively. During the Holocene (past 10,000 years) about 10-12 m have accumulated. The sediment entered the basin by one or a combination of processes including particle infall (mainly as bioaggregates) from surface waters, from nepheloid plumes (surface, mid-depths and near-bottom), from turbidity currents, mass movements, and to a very minor degree direct precipitation. In Santa Monica Basin, during the last century, particle infall and nepheloid plume transport have been the most common processes. The former dominates in the central basin floor in water depths from 900 to 945 m. where a characteristic silt-clay with a typical mean diameter of about 0.006 mm, phi standard deviation.

Gorsline, D.S.

1991-12-31T23:59:59.000Z

263

Permit Types, Tiers, and Parking Privileges 2012-2013 Alr 07-01-2012 1  

E-Print Network [OSTI]

loading permit from booth. M (motorcycle permit) Motorcycle Spaces ME (Maple Avenue Complex) Perimeter

264

Construction Endorsement Process in Russia.  

E-Print Network [OSTI]

??The construction endorsement and receiving of construction permit is a long lasting and very complicated process in Russia. There is no one and only instruction (more)

Avanesov, Alexander

2010-01-01T23:59:59.000Z

265

HANFORD K BASINS SLUDGE RETREIVAL & TREATMENT  

SciTech Connect (OSTI)

This paper shows how Fluor Hanford and BNG America have combined nuclear plant skills from the US and the UK to devise methods to retrieve and treat the sludge that has accumulated in K Basins at the Hanford site over many years. Retrieving the sludge is the final stage in removing fuel and sludge from the basins to allow them to be decontaminated and decommissioned, thus removing the threat of contamination of the Columbia River. A description is given of sludge retrieval using vacuum lances and specially developed nozzles and pumps into Consolidation Containers within the basins. The special attention that had to be paid to the heat generation and potential criticality issues with the irradiated uranium-containing sludge is described. The processes developed to re-mobilize the sludge from the Consolidation Containers and pump it through flexible and transportable hose-in-hose piping to the treatment facility are explained with particular note made of dealing with the abrasive nature of the sludge. The treatment facility, housed in an existing Hanford building is described, and the uranium-corrosion and grout encapsulation processes explained. The uranium corrosion process is a robust, tempered process very suitable for dealing with a range of differing sludge compositions. The grout process to produce the final waste form is backed by BNG America's 20 years experience of grouting radioactive waste at Sellafield and elsewhere. The use of transportable and re-usable equipment is emphasized and its role noted in avoiding new plant build that itself will require cleanup. The processes and techniques described in the paper are shown to have wide applicability to nuclear cleanup worldwide.

VASQUEZ, D.A.

2005-07-05T23:59:59.000Z

266

Why Sequencea Near-Shore Anoxic Basin?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a Near-Shore Anoxic Basin? a Near-Shore Anoxic Basin? Oxygen minimum zones (OMZs; areas of low dissolved oxygen concentrations) play a major role in biogeochemical cycling within the world's oceans. They are major sinks for nitrogen and sources for the gases carbon dioxide and nitrous oxide. Microbially mediated biological activity associated with these systems affects the productivity of the deep blue sea and the balance of greenhouse gases in the atmosphere. Thus, studies aimed at evaluating the phylogenetic variation and metabolic capacity of microbial communities within these systems have great promise to enhance our understanding of the patterns and processes that drive global biogeochemical phenomena in both aquatic and atmospheric compartments of the biosphere. To this end, JGI and

267

Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compressed Natural Gas Compressed Natural Gas (CNG) Dealer Permit to someone by E-mail Share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Facebook Tweet about Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Twitter Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Google Bookmark Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Delicious Rank Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on Digg Find More places to share Alternative Fuels Data Center: Compressed Natural Gas (CNG) Dealer Permit on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Compressed Natural Gas (CNG) Dealer Permit

268

Solar and Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Contents 1 Solar/Wind Permitting Standards Incentives 2 References Solar/Wind Permitting Standards Incentives

269

File:UtilityPermitFranchiseApp.pdf | Open Energy Information  

Open Energy Info (EERE)

UtilityPermitFranchiseApp.pdf Jump to: navigation, search File File history File usage Metadata File:UtilityPermitFranchiseApp.pdf Size of this preview: 463 599 pixels. Other...

270

DOE to Hold Public Information Meetings on Permit Modifications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Meetings On Permit Modifications CARLSBAD, N.M., May 8, 2001 - The public is invited to comment on two proposed modifications to the Hazardous Waste Facility Permit for the Waste...

271

Idaho Dredge and Fill Permits Webpage | Open Energy Information  

Open Energy Info (EERE)

Fill Permits Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Dredge and Fill Permits Webpage Author Idaho Department of Environmental...

272

WAC - 173-401 Operating Permit Regulation | Open Energy Information  

Open Energy Info (EERE)

Operating Permit Regulation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: WAC - 173-401 Operating Permit RegulationLegal...

273

Hazardous Waste Facility Permit Fact Sheet | Open Energy Information  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Hazardous Waste Facility Permit Fact SheetLegal Abstract Hazardous Waste Facility Permit Fact Sheet,...

274

Hazardous Waste Facility Permit Public Comments to Community...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

covered by the permit. Please use another word for "promulgated," such as "created." This section should state that it is a ten-year permit, set to expire in November 2020. It...

275

Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fueling Station Air Fueling Station Air Quality Permit Exemption to someone by E-mail Share Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Facebook Tweet about Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Twitter Bookmark Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Google Bookmark Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Delicious Rank Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on Digg Find More places to share Alternative Fuels Data Center: Fueling Station Air Quality Permit Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fueling Station Air Quality Permit Exemption

276

Idaho Application for Water Permit (DWR Form 202) | Open Energy...  

Open Energy Info (EERE)

Idaho Application for Water Permit (DWR Form 202) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Application for Water Permit (DWR Form 202)...

277

GRR/Section 18-WA-b - Dangerous Waste Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 18-WA-b - Dangerous Waste Permit GRR/Section 18-WA-b - Dangerous Waste Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-b - Dangerous Waste Permit 18-WA-b - Dangerous Waste Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-303-020 WAC 173-303-060 WAC 173-303-070 WAC 173-303-071 WAC 173-303-072 WAC 173-303-081 WAC 173-303-082 WAC 173-303-090 WAC 173-303-100 WAC 173-303-110 WAC 173-303-140 WAC 173-303-220 WAC 173-303-281 WAC 173-303-282 WAC 173-303-803 WAC 173-303-845 Triggers None specified The Washington State Department of Ecology (WSDE) oversees the permitting process for dangerous and solid waste. In Washington, a developer must obtain a permit if they handle dangerous waste and solid waste and are

278

On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish)  

E-Print Network [OSTI]

This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

Lesikar, Bruce J.

2005-04-30T23:59:59.000Z

279

Advanced Chemistry Basins Model  

SciTech Connect (OSTI)

The objective of this project is to: (1) Develop a database of additional and better maturity indicators for paleo-heat flow calibration; (2) Develop maturation models capable of predicting the chemical composition of hydrocarbons produced by a specific kerogen as a function of maturity, heating rate, etc.; assemble a compositional kinetic database of representative kerogens; (3) Develop a 4 phase equation of state-flash model that can define the physical properties (viscosity, density, etc.) of the products of kerogen maturation, and phase transitions that occur along secondary migration pathways; (4) Build a conventional basin model and incorporate new maturity indicators and data bases in a user-friendly way; (5) Develop an algorithm which combines the volume change and viscosities of the compositional maturation model to predict the chemistry of the hydrocarbons that will be expelled from the kerogen to the secondary migration pathways; (6) Develop an algorithm that predicts the flow of hydrocarbons along secondary migration pathways, accounts for mixing of miscible hydrocarbon components along the pathway, and calculates the phase fractionation that will occur as the hydrocarbons move upward down the geothermal and fluid pressure gradients in the basin; and (7) Integrate the above components into a functional model implemented on a PC or low cost workstation.

Blanco, Mario; Cathles, Lawrence; Manhardt, Paul; Meulbroek, Peter; Tang, Yongchun

2003-02-13T23:59:59.000Z

280

RAPID/Roadmap/19-CO-c | Open Energy Information  

Open Energy Info (EERE)

19-CO-c Designated Ground Water Basin Well Permitting Process 19COCDesignatedGroundWaterBasinWellPermit.pdf Click to View Fullscreen Permit Overview Colorado has special rules for...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Biotechnology Regulatory Services public data file (permits, notifications,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biotechnology Regulatory Services public data file (permits, notifications, Biotechnology Regulatory Services public data file (permits, notifications, and petitions) Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Biotechnology Regulatory Services public data file (permits, notifications, and petitions) Dataset Summary Description Public information on BRS applications for genetically engineered permits, notifications, and petitions. Tags {BRS,Permits,Notifications,Petitions,GE,"Agronomic Properties","Bacterial Resistance","Fungal Resistance","Herbicide Tolerance","Insect Resistance","Marker Gene","Nematode Resistance","Product Quality","Virus Resistance",Institution,Article,Phenotypes,"Genotypes "}

282

Hazardous Waste Transporter Permits (Connecticut) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hazardous Waste Transporter Permits (Connecticut) Hazardous Waste Transporter Permits (Connecticut) Hazardous Waste Transporter Permits (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection Transportation of hazardous wastes into or through the State of Connecticut requires a permit. Some exceptions apply. The regulations provide

283

Aquatic Habitat Protection Permit (Saskatchewan, Canada) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Aquatic Habitat Protection Permit (Saskatchewan, Canada) Aquatic Habitat Protection Permit (Saskatchewan, Canada) Aquatic Habitat Protection Permit (Saskatchewan, Canada) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Rural Electric Cooperative Schools Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Saskatchewan Program Type Environmental Regulations Siting and Permitting Provider Saskatchewan Ministry of the Environment The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of aquatic habitat and states that a permit is required: to

284

Storm Water Discharge Permits (Wisconsin) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Storm Water Discharge Permits (Wisconsin) Storm Water Discharge Permits (Wisconsin) Storm Water Discharge Permits (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info Start Date 08/2004 State Wisconsin Program Type Siting and Permitting Provider Department of Natural Resources Wisconsin's storm water runoff regulations include permitting requirements for construction sites and industrial facilities, including those

285

Solar/Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards < Solar Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Solar/Wind Permitting Standards Incentives CSV (rows 1 - 55) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active

286

GRR/Section 6 - Construction Permits Overview | Open Energy Information  

Open Energy Info (EERE)

6 - Construction Permits Overview 6 - Construction Permits Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6 - Construction Permits Overview 06 - ConstructionPermitsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06 - ConstructionPermitsOverview.pdf 06 - ConstructionPermitsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Constructing a geothermal power plant requires numerous permits from Federal, state, and local governments, related to transporting construction materials, encroaching upon Federal and state right-of-ways, demolishing existing structures and building new structures.

287

Solar and Wind Permitting Laws | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permitting Laws Permitting Laws Solar and Wind Permitting Laws < Back Eligibility Commercial Industrial Nonprofit Residential Schools Savings Category Solar Buying & Making Electricity Wind Program Info State New Jersey Program Type Solar/Wind Permitting Standards Provider New Jersey Department of Community Affairs New Jersey has enacted three separate laws addressing local permitting practices for solar and wind energy facilities. The first deals with solar and wind facilities located in industrial-zoned districts; the second with wind energy devices sited on piers; and the third addresses permitting standards small wind energy devices in general. All three are described below. '''Solar and Wind as Permitted Uses in Industrial Zones''' In March 2009 the state enacted legislation (A.B. 2550) defining facilities

288

KE Basin Sludge Flocculant Testing  

SciTech Connect (OSTI)

In the revised path forward and schedule for the K Basins Sludge Retrieval and Disposal Project, the sludge in K East (KE) Basin will be moved from the floor and pits and transferred to large, free-standing containers located in the pits (so as to isolate the sludge from the basin). When the sludge is pumped into the containers, it must settle fast enough and clarify sufficiently that the overflow water returned to the basin pool will not cloud the water or significantly increase the radiological dose rate to the operations staff as a result of increased suspended radioactive material. The approach being evaluated to enhance sludge settling and speed the rate of clarification is to add a flocculant to the sludge while it is being transferred to the containers. In February 2004, seven commercial flocculants were tested with a specific K Basin sludge simulant to identify those agents that demonstrated good performance over a broad range of slurry solids concentrations. From this testing, a cationic polymer flocculant, Nalco Optimer 7194 Plus (7194+), was shown to exhibit superior performance. Related prior testing with K Basin sludge and simulant in 1994/1996 had also identified this agent as promising. In March 2004, four series of jar tests were conducted with 7194+ and actual KE Basin sludge (prepared by combining selected archived KE sludge samples). The results from these jar tests show that 7194+ greatly improves settling of the sludge slurries and clarification of the supernatant.

Schmidt, Andrew J.; Hallen, Richard T.; Muzatko, Danielle S.; Gano, Sue

2004-06-23T23:59:59.000Z

289

Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1  

SciTech Connect (OSTI)

In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

Not Available

1993-03-24T23:59:59.000Z

290

Division of Oil, Gas, and Mining Permitting  

E-Print Network [OSTI]

" or "Gas" does not include any gaseous or liquid substance processed from coal, oil shale, or tar sands

Utah, University of

291

Rivanna River Basin Commission (Virginia)  

Broader source: Energy.gov [DOE]

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

292

Coal Supply Basin Destination State  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Implicit Price Deflators for Gross Domestic Product, as published by the U.S. Bureau of Economic Analysis. For the composition of coal basins, refer to the definition of...

293

California basin study (CaBS)  

SciTech Connect (OSTI)

Previous studies of geochemical recycling processes in the upper water column in the Southern California Bight focused on the seasonal cycle. Inspection of satellite sea surface color images as well as information from studies in other areas suggest that the cycling processes have significant variability on time scales of hours and days. To allow our seasonal studies to be examined in the context of the higher frequency variability, an interdisciplinary mooring was maintained near the midpoint of Santa Monica basin (known as station 305) from January to July, 1990. The Hickey group had the primary responsibility of deploying and recovering the mooring. The mooring consisted of a vector measuring wind recorder mounted above a toroidal buoy, below which were suspended two current/temperature recorders, a trnasmissometer, and two PAR sensors. The PAR sensors, which provide an estimate of phytoplankton growth rates, were deployed as part of the Trees proposal. At two additional nearby moorings, sediment traps were deployed at selected depths throughout the water column by Landry and by Soutar. To allow some investigation of lateral advection of material, current meters were deployed at the same depths as several of the sediment traps both at this site and also at the site farther along the basin axis. The data from these experiments have not yet been processed. 6 refs., 10 figs.

Hickey, B.M.

1990-01-01T23:59:59.000Z

294

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

Hemmert, Karl Scott; Underwood, Keith D

2014-04-01T23:59:59.000Z

295

K Basins Sludge Treatment Project Phase 1 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

K Basins Sludge Treatment Project Phase 1 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download K Basins Sludge Treatment Project...

296

Presidential Permits and Export Authorizations - Frequently Asked Questions  

Broader source: Energy.gov (indexed) [DOE]

Permits and Export Permits and Export Authorizations - Frequently Asked Questions Presidential Permits and Export Authorizations - Frequently Asked Questions Presidential Permits Export Authorizations Self Certifications Annual Reports Presidential Permits What are they? Permits for the construction, connection, operation and/or maintenance of electric transmission lines that cross the U.S. international border. What are the criteria? Two primary criteria are used to determine if a proposed project is consistent with the public interest. 1. DOE considers the impact the proposed project would have on the operating reliability of the U.S. electric power supply. 2. DOE must comply with the National Environmental Policy Act of 1969 (NEPA), which requires DOE to consider the environmental consequences

297

Presidential Permit Holders - Annual Reports | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permit Holders - Permit Holders - Annual Reports Presidential Permit Holders - Annual Reports Presidential permit holders are responsible for reporting the gross amount electric energy which flows into and out of the United States over the permitted international transmission facility regardless if the energy is wheeled to or for another entity. For example, utility A receives a Presidential permit for a single international transmission line across the U.S.-Canadian border. During the calendar year just completed, 300,000,000 kilowatt-hours (kwh) are imported from Canada across this line. Utility A arranged for the purchase of 200,000,000 kwh for its own use and wheeled 100,000,000 kwh to neighboring utility B. Utility A must report 300,000,000 kwh of imports over the international

298

Environmental assessment for presidential permit applications for Baja  

Broader source: Energy.gov (indexed) [DOE]

Environmental assessment for presidential permit applications for Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources. December 2001 PP-234 and PP-235 Enviornmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 More Documents & Publications DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact

299

Orange County - Wind Permitting Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Orange County - Wind Permitting Standards Orange County - Wind Permitting Standards Orange County - Wind Permitting Standards < Back Eligibility Agricultural Commercial Residential Savings Category Wind Buying & Making Electricity Program Info State California Program Type Solar/Wind Permitting Standards Provider OC Planning In December 2010, the County of Orange Board of Supervisors adopted small wind performance and development standards (Ord. No. 10-020) in order to promote distributed generation systems in non-urbanized areas (as defined in Government Code Section 65944(d)(2)) within the unincorporated territory. Permitting standards are for systems of 50 kW or less per customer site, for which the energy is primarily for on-site consumption. Height: For systems 45 feet tall or less, a use permit must be approved by

300

Expedited Permitting of Grid-Scale Wind Energy Development (Maine) |  

Broader source: Energy.gov (indexed) [DOE]

Expedited Permitting of Grid-Scale Wind Energy Development (Maine) Expedited Permitting of Grid-Scale Wind Energy Development (Maine) Expedited Permitting of Grid-Scale Wind Energy Development (Maine) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Wind Buying & Making Electricity Program Info State Maine Program Type Siting and Permitting Maine's Expedited Permitting of Grid-Scale Wind Energy Development statue provides an expedited permitting pathway for proposed wind developments in

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

The Evolution of Boundary Pressure in Ocean Basins  

Science Journals Connector (OSTI)

The boundary pressure adjustment process on an ocean basin scale is elucidated in two sets of numerical experiments. First, an initial-value problem is posed in a primitive equation shallow-water model that leads to significant changes in the ...

Ralph F. Milliff; James C. McWilliams

1994-06-01T23:59:59.000Z

302

Isotope hydrology of catchment basins: lithogenic and cosmogenic isotopic systems  

SciTech Connect (OSTI)

A variety of physical processes affect solute concentrations within catchment waters. The isotopic compositions of the solutes can indicate which processes have determined the observed concentrations. These processes together constitute the physical history of the water. Many solutes in natural waters are derived from the interaction between the water and the rock and/or soil within the system - these are termed `lithogenic` solutes. The isotopic compositions of these solutes provide information regarding rock-water interactions. Many other solutes have their isotopic compositions determined both within and outside of the catchment - i.e., in addition to being derived from catchment rock and soil, they are solutes that are also transported into the catchment. Important members of this group include solutes that have isotopic compositions produced by atomic particle interactions with other nuclides. The source of the atomic particles can be cosmic radiation (producing `cosmogenic` nuclides in the atmosphere and land surface), anthropogenic nuclear reactions (producing `thermonuclear` nuclides), or radioactive and fission decay of naturally-occurring elements, principally {sup 238}U (producing `in-situ` lithogenic nuclides in the deep subsurface). Current language usage often combines all of the atomic particle-produced nuclides under the heading `cosmogenic nuclides`, and for simplicity we will often follow that usage here, although always indicating which variety is being discussed. This paper addresses the processes that affect the lithogenic and cosmogenic solute concentrations in catchment waters, and how the isotopic compositions of the solutes can be used in integrative ways to identify these processes, thereby revealing the physical history of the water within a catchment system. The concept of a `system` is important in catchment hydrology. A catchment is the smallest landscape unit that can both participate in all of the aspects of the hydrologic cycle and also be treated as a mostly closed system for mass balance considerations. It is the near closure of the system that permits well- constrained chemical mass balance calculations to be made. These calculations generally focus of lithogenic solutes, and therefore in our discussions of lithogenic nuclides in the paper, the concept of chemical mass balance in a nearly dosed system will play an important role. Examination of the isotopic compositions of solutes provides a better understanding of the variety of processes controlling mass balance. It is with this approach that we examined the variety of processes occurring within the catchment system, such as weathering and soil production, generation of stormflow and streamflow (hydrograph separation), movement of soil pore water, groundwater flow, and the overall processes involved with basinal water balance. In this paper, the term `nuclide` will be used when referring to a nuclear species that contains a particular number of protons and neutrons. The term is not specific to any element. The term `isotope` will be used to distinguish nuclear species of a given element (atoms with the same number of protons). That is to say, there are many nuclides in nature - for example, {sup 36}Cl, {sup 87}Sr, {sup 238}U; the element has four naturally-occurring isotopes - {sup 87}Sr, and {sup 88}Sr. This paper will first discuss the general principles that underlie the study of lithogenic and cosmogenic nuclides in hydrology, and provide references to some of the more important studies applying these principles and nuclides. We then turn in the second section to a discussion of their specific applications in catchment- scale systems. The final section of this paper discusses new directions in the application of lithogenic and cosmogenic nuclides to catchment hydrology, with some thoughts concerning possible applications that still remain unexplored.

Nimz, G. J., LLNL

1998-06-01T23:59:59.000Z

303

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

304

Phase III - Permitting and Initial Development | Open Energy Information  

Open Energy Info (EERE)

III - Permitting and Initial Development III - Permitting and Initial Development Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home GEA Development Phase III: Permitting and Initial Development GEA Development Phases The Geothermal Energy Association's (GEA) Geothermal Reporting Terms and Definitions are a guideline for geothermal developers to use when submitting geothermal resource development information to GEA for public dissemination in its annual US Geothermal Power Production and Development Update. GEA's Geothermal Reporting Terms and Definitions serve to increase the consistency, accuracy, and reliability of industry information presented in the development updates. Phase I - Resource Procurement and Identification Phase II - Resource Exploration and Confirmation Phase III - Permitting and Initial Development

305

Alteration of Terrain Permits (New Hampshire) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alteration of Terrain Permits (New Hampshire) Alteration of Terrain Permits (New Hampshire) Alteration of Terrain Permits (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Hampshire Program Type Siting and Permitting Provider NH Department of Environmental Services Alteration of Terrain Bureau

306

Bureau of Land Management - Geothermal Drilling Permit | Open...  

Open Energy Info (EERE)

Bureau of Land Management - Geothermal Drilling Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Bureau of Land Management - Geothermal Drilling...

307

Frederick County (Maryland) Department of Permits and Inspections (FCDPI)  

Broader source: Energy.gov [DOE]

The Frederick County (Maryland) Department of Permits and Inspections (FCDPI) is currently reviewing two proposed amendments to the 2012 International Energy Conservation Code (IECC), copies of...

308

Colorado - Access Permit Pre-Design Checklist | Open Energy Informatio...  

Open Energy Info (EERE)

Checklist Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Colorado - Access Permit Pre-Design Checklist Author Colorado Department of Transportation...

309

ARM 12-14-101 - Commercial Use Permitting Requirements: Definitions...  

Open Energy Info (EERE)

permitting requirements for land within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

310

Alaska Sample Special Area Permit | Open Energy Information  

Open Energy Info (EERE)

to library General: Alaska Sample Special Area Permit Author Alaska Department of Fish and Game Published Division of Habitat, 122012 DOI Not Provided Check for DOI...

311

50 CFR 13 - General Permit Procedures | Open Energy Information  

Open Energy Info (EERE)

denial, suspension, revocation, and general administration of permits issued by the Fish and Wildlife Service. Published NA Year Signed or Took Effect 2014 Legal Citation 50...

312

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Conservation Law Foundation, Appalachian Mountain Club, and Society for the Protection of New Hampshire Forests Application for Presidential Permit OE Docket No. PP-371 Northern...

313

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Broader source: Energy.gov (indexed) [DOE]

Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

314

CDOT - Utility/Special Use Permit Application | Open Energy Informatio...  

Open Energy Info (EERE)

to the CDOT UtilitySpecial Use Permit application. Author Colorado Department of Transportation Published Colorado Department of Transportation, 2007 DOI Not Provided Check for...

315

CDOT - State Highway Access Permit Application | Open Energy...  

Open Energy Info (EERE)

CDOT - State Highway Access Permit Application Author Colorado Department of Transportation Published Colorado Department of Transportation, 2010 DOI Not Provided Check for...

316

CDOT - Permit Standard Provisions Example | Open Energy Information  

Open Energy Info (EERE)

General: CDOT - Permit Standard Provisions Example Author Colorado Department of Transportation Published Colorado Department of Transportation, 2006 DOI Not Provided Check for...

317

Innovation and Success in Solar Permitting and Inspections  

Broader source: Energy.gov (indexed) [DOE]

Webinar 2: Innovation and Success in Solar Permitting and Inspections Transcript June 26, 2013 Speaker: Courtney Kendal Slide 1: Good afternoon. My name is Courtney Kendall,...

318

EPA - Construction General Permit webpage | Open Energy Information  

Open Energy Info (EERE)

webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Construction General Permit webpage Abstract This is the Environmental Protection...

319

CDWR Well Permitting Forms and Associated Documents | Open Energy...  

Open Energy Info (EERE)

Associated Documents Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: CDWR Well Permitting Forms and Associated Documents Abstract This webpage...

320

BLM - Information on Cultural Resource Use Permits webpage |...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM - Information on Cultural Resource Use Permits webpage Abstract This webpage provides information...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

maintain electric transmission facilities at the U.S. - Canada Border. SOULE RIVER HYDROELECTRIC PROJECT More Documents & Publications Application for Presidential Permit OE...

322

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Correction Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction...

323

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2013 Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project: Federal Register Notice, Volume 78, No. 146 - July 30, 2013 Application...

324

Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)  

SciTech Connect (OSTI)

Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

Young, K.

2014-04-01T23:59:59.000Z

325

Property:ExplorationPermit-PreDrilling | Open Energy Information  

Open Energy Info (EERE)

Permit from the Hawaii Department of Land and Natural Resources Engineering Division to conduct any exploration activity on state or reserved lands for evidence of geothermal...

326

Hawaii Application for Community Noise Permit (DOH Form CNP)...  

Open Energy Info (EERE)

Application for Community Noise Permit Organization State of Hawaii Department of Health Published Publisher Not Provided, 012008 DOI Not Provided Check for DOI availability:...

327

Hawaii Guide for Filing Community Noise Permit Applications ...  

Open Energy Info (EERE)

permit applications for construction activities. Author State of Hawaii Department of Health Published State of Hawaii, 2008 DOI Not Provided Check for DOI availability: http:...

328

Hawaii EIS-EA Permit Packet | Open Energy Information  

Open Energy Info (EERE)

PacketPermittingRegulatory GuidanceSupplemental Material Authors Hawaii Department of Health and Office of Environmental Quality Control Published State of Hawaii, 72014 DOI Not...

329

Appendix F. Permits AnnualSiteEnvironmentalRepor  

E-Print Network [OSTI]

/17/2003 DOE DOE BWXT CAA Depleted Uranium Forming and Heat Transfer (Construction Permit) 950266P 11/4/1998 7

Pennycook, Steve

330

Request for Information on Improving Performance of Federal Permitting...  

Broader source: Energy.gov (indexed) [DOE]

of Infrastructure Projects: Federal Register Notice Volume 78, No. 168 - August 29, 2013 Request for Information on Improving Performance of Federal Permitting and Review of...

331

Application for Presidential Permit OE Docket No. PP-299 Sea...  

Broader source: Energy.gov (indexed) [DOE]

99 Sea Breeze Pacific Regional Transmission System, INC Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC TBDApplication...

332

WSDE Air Operating Permits Register Entries webpage | Open Energy...  

Open Energy Info (EERE)

takes on a facility's permit application. Author Washington State Department of Ecology Published Washington State Department of Ecology, Date Not Provided DOI Not Provided...

333

File:CDPHE Industrial Individual Wastewater Discharge Permit...  

Open Energy Info (EERE)

Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search File File history File usage Metadata File:CDPHE Industrial Individual Wastewater...

334

Nevada Sample Application for Permit Under Utility Environmental...  

Open Energy Info (EERE)

Collins. Initial Application of K Road Moapa Solar, LLC for a Permit to Construct A Transmission Line Under the Utility Environmental Protection Act. Retrieved from "http:...

335

Property:AirQualityPermitAgency | Open Energy Information  

Open Energy Info (EERE)

"AirQualityPermitAgency" Showing 1 page using this property. R RAPIDOverviewGeothermalAir QualityAlaska + Alaska Department of Environmental Conservation + Retrieved from...

336

UPDES Storm Water Permits: General Construction Website | Open...  

Open Energy Info (EERE)

Construction Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UPDES Storm Water Permits: General Construction Website Abstract this website...

337

Air Permit Program Information Page | Open Energy Information  

Open Energy Info (EERE)

Web Site: Air Permit Program Information Page Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability: http:...

338

Title V Operation Permit Application Webpage | Open Energy Information  

Open Energy Info (EERE)

Application Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Title V Operation Permit Application Webpage Author Division of Air Quality...

339

Air Permit Program Application Forms | Open Energy Information  

Open Energy Info (EERE)

Web Site: Air Permit Program Application Forms Author Division of Air Quality Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability:...

340

Idaho Permit to Construct Application Webpage | Open Energy Informatio...  

Open Energy Info (EERE)

Application Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Permit to Construct Application Webpage Abstract This webpage provides access...

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Alaska Division of Water Permit Fees | Open Energy Information  

Open Energy Info (EERE)

Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability:...

342

Colorado Construction Air Permit Application | Open Energy Information  

Open Energy Info (EERE)

for a construction permit for construction of a commercial or industrial source of air pollution. Form Type ApplicationNotice Form Topic Air Pollution Control Division -...

343

Hawaii Air Pollution Control Permits Webpage | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Air Pollution Control Permits Webpage Abstract Information about Air Pollution Control...

344

Optimizing operational flexibility and enforcement liability in Title V permits  

SciTech Connect (OSTI)

Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

McCann, G.T. [Rust Environment and Infrastructure Inc., Greenville, SC (United States)

1997-12-31T23:59:59.000Z

345

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Notice of Intent to Prepare an Environmental Impact Statement: Federal...

346

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal Register Notice, Vol. 79, No. 93 - May 14, 2014 Application...

347

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

: Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line Project: Federal Register Notice, Volume 79, No. 190 - Oct. 1, 2014 Application for...

348

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line Application from Great Northern (GNTL) to construct, operate and...

349

Application for a Colorado State Permit for Achaeological or...  

Open Energy Info (EERE)

Form: Application for a Colorado State Permit for Achaeological or Paleontological Work Abstract This application must be submitted and approved prior to commencing...

350

Permitting of Consumptive Uses of Water (Florida) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permitting of Consumptive Uses of Water (Florida) Permitting of Consumptive Uses of Water (Florida) Permitting of Consumptive Uses of Water (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection Local water management districts are required to establish programs and

351

Montana Disinfected Water and Hydrostatic Testing General Permit...  

Open Energy Info (EERE)

Montana Disinfected Water and Hydrostatic Testing General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Montana Disinfected Water and Hydrostatic...

352

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to...

353

Geothermal: Sponsored by OSTI -- Regulatory and Permitting Information...  

Office of Scientific and Technical Information (OSTI)

Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster) Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search...

354

Funding Mechanisms for Federal Geothermal Permitting (Presentation)  

SciTech Connect (OSTI)

This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

Witherbee, K.

2014-03-01T23:59:59.000Z

355

Microsoft Word - Powder River Basin 1_6_06.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Economics of Powder River Basin Economics of Powder River Basin Coalbed Methane Development Prepared for: U.S. Department of Energy Prepared by: Gregory C. Bank Vello A. Kuuskraa vkuuskraa@adv-res.com Advanced Resources International, Inc. January 2006 Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. The Economics of Powder River Basin Coalbed Methane Development

356

Early Site Permit Demonstration Program: Station design alternatives report  

SciTech Connect (OSTI)

This report provides the results of investigating the basis for including Station Design Alternatives (SDAs) in the regulatory guidance given for nuclear plant environmental reports (ERs), explains approaches or processes for evaluating SDAs at the early site permit (ESP) stage, and applies one of the processes to each of the ten systems or subsystems considered as SDAS. The key objective o this report s to demonstrate an adequate examination of alternatives can be performed without the extensive development f design data. The report discusses the Composite Suitability Approach and the Established Cutoff Approach in evaluating station design alternatives and selects one of these approaches to evaluate alternatives for each of the plant or station that were considered. Four types of ALWRs have been considered due to the availability of extensive plant data: System 80+, AP600, Advanced Boiling Reactor (ABWR), and Simplified Boiling Water Reactor (SBWR). This report demonstrates the feasibility of evaluating station design alternatives when reactor design detail has not been determined, quantitatively compares the potential ental impacts of alternatives, and focuses the ultimate selection of a alternative on cost and applicant-specific factors. The range of alternatives system is deliberately limited to a reasonable number to demonstrate the or to the three most commonly used at operating plants.

Not Available

1993-03-01T23:59:59.000Z

357

Waste Feed Delivery Environmental Permits and Approvals Plan  

SciTech Connect (OSTI)

This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

TOLLEFSON, K.S.

2000-01-18T23:59:59.000Z

358

The Initial Allocation of Carbon Permits: Choices and Implications  

E-Print Network [OSTI]

the playing field, and we need other nations to cut emissions. 3. Permit value to R&D, renewable energy Cost MC + carbon tax Demand Fixed pollution per unit output (tons carbon per Kwh). The "demandThe Initial Allocation of Carbon Permits: Choices and Implications Prof. Don Fullerton University

359

DOE Environmental Assessment EA-1391 for Presidential Permit Applications  

Broader source: Energy.gov (indexed) [DOE]

DOE Environmental Assessment EA-1391 for Presidential Permit DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact The Department of Energy has determined in its Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 a finding of no significant impact Finding of No Significant Impact: DOE Enviornmental Assessment EA-1391 More Documents & Publications Environmental assessment for presidential permit applications for Baja

360

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

City of Asheville - Building Permit Fee Waiver | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 7/01/2009 State North Carolina Program Type Green Building Incentive Provider Building Safety Department The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings. Waivers for building permit fees may apply to residences with the following designations (the regular fee is in parentheses): * HealthyBuilt Home Certification* ($100) * Energy Star Rating ($100) * Geothermal heat pumps ($50)

362

Presidential Permits and Export Authorizations - About the Program |  

Broader source: Energy.gov (indexed) [DOE]

Presidential Permits and Export Presidential Permits and Export Authorizations - About the Program Presidential Permits and Export Authorizations - About the Program The Federal international electricity program consists of two elements: 1.Granting Presidential permits for the construction, connection, operation and/or maintenance of electric transmission lines which cross the U.S. international border; and 2.Authorizing exports of electric energy to foreign countries. The authority to grant Presidential permits is derived from the constitutional power of the President to protect the territorial integrity of the United States. The authority to regulate the export of electric energy is based on the statutory authority contained in section 202(e) of the Federal Power Act (FPA). Executive Order 8202, issued by President Roosevelt in 1939, prohibited

363

State Water Permit Regulation (Arkansas) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permit Regulation (Arkansas) Permit Regulation (Arkansas) State Water Permit Regulation (Arkansas) < Back Eligibility Fuel Distributor Industrial Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality It is the purpose of this regulation to adopt standards applicable to the storage, discharge, or disposal of any waste which, if unregulated, will cause pollution of waters of the state or result in wastes being placed in a location where it is likely to cause pollution of the waters of the state. These standards are intended to protect public health and the environment, and prevent, control, or abate pollution. The State Water Permit Regulation is implemented to adopt standards applicable to the storage, discharge, or disposal of any waste that, if

364

Environment/Health/Safety (EHS): Operating Permits for LBNL Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operating Permits for LBNL Activities Operating Permits for LBNL Activities LBNL Main Site Agency Expiration Date Certified Unified Program Agency Permit and Registration Hazardous Materials Release Response Plan (Hazardous Materials Business Plan) Aboveground Petroleum Storage Tanks, Spill Prevention Control and Countermeasures Plan Underground Storage Tank Program Hazardous Waste Generator Program Tiered Permit Program for Onsite Treatment of Hazardous Wastes City of Berkeley March 1, 2014 Fuel Dispensing Sources at Building 76: E85 Unleaded Bay Area Air Quality Management District July 1, 2014 Stationary Air Emission Sources (28 permits): Diesel-powered Emergency Standby Generators: Buildings 2, 31, 37(2), 48, 50A, 50B, 55, 62, 64(2), 66, 67, 68, 70, 70A, 72, 74, 77, 84B, 85 and three (3) portable units

365

Energetic Processes Instrumentation w/ Lasers | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

equipment and at EMSL must be performed in compliance with EMSL practices and permits. UHV Laser DesorptionAblation Apparatus In EMSL's energetic processes laboratory,...

366

Great Basin | Open Energy Information  

Open Energy Info (EERE)

Great Basin Great Basin Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Great Basin Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.609920257001,"lon":-114.0380859375,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

367

Denver Basin Map | Open Energy Information  

Open Energy Info (EERE)

Map Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Denver Basin Map Abstract This webpage contains a map of the Denver Basin. Published Colorado...

368

Coos Bay Field Gulf Coast Coal Region Williston Basin Illinois  

U.S. Energy Information Administration (EIA) Indexed Site

San Juan Basin C e n t r a l A p p a l a c h i a n B a s i n Michigan Basin Greater Green River Basin Black Warrior Basin North Central Coal Region Arkoma Basin Denver Basin...

369

Hydrogeochemical Indicators for Great Basin Geothemal Resources  

Broader source: Energy.gov [DOE]

Hydrogeochemical Indicators for Great Basin Geothemal Resources presentation at the April 2013 peer review meeting held in Denver, Colorado.

370

Hanford facility dangerous waste permit application, general information portion. Revision 3  

SciTech Connect (OSTI)

For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

Sonnichsen, J.C.

1997-08-21T23:59:59.000Z

371

Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)  

SciTech Connect (OSTI)

This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10'' to 20'' API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

Olsen, D.K.; Johnson, W.I.

1993-05-01T23:59:59.000Z

372

Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)  

SciTech Connect (OSTI)

This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10`` to 20`` API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

Olsen, D.K.; Johnson, W.I.

1993-05-01T23:59:59.000Z

373

Atlas of the Columbia River Basin  

E-Print Network [OSTI]

#12;Atlas of the Columbia River Basin Oregon State University Computer-Assisted Cartography Course & GEOVISUALIZATION GROUP UNIVERSITY #12;2013 Oregon State University Atlas of the Columbia River Basin FOREWORDAtlas, Montana, Nevada, Wyoming, and Utah. 2013 Oregon State University Atlas of the Columbia River Basin

Jenny, Bernhard

374

LAND USE AND OWNERSHIP, WILLISTON BASIN  

E-Print Network [OSTI]

Chapter WM LAND USE AND OWNERSHIP, WILLISTON BASIN By T.T. Taber and S.A. Kinney In U.S. Geological........................................WM-1 Map Information for the Williston Basin Land Use And Land Cover Map.........................................................WM-2 Map Information for the Williston Basin Subsurface Ownership map

375

NILE BASIN INITIATIVE Claire Stodola  

E-Print Network [OSTI]

· Climate Change #12;Upstream states · Low water needs Downstream states · High water needs #12;Historical #12;Research Question How has the Nile Basin Initiative influenced the riparian states' management states 1959 ­ Still only BILATERAL 1960s to 1990s - Increasing frustration by upstream states #12;What

New Hampshire, University of

376

Tropical forests: Include Congo basin  

Science Journals Connector (OSTI)

... 478, 378381; 2011). But their meta-analysis of 138 studies overlooks the Congo basin, the second-largest continuous area of rainforest in the world; moreover, only ... the lack of recent and accessible legacy data for this region. The Democratic Republic of Congo (DRC), which contains 98 million hectares of rainforest (60% of the ...

Hans Verbeeck; Pascal Boeckx; Kathy Steppe

2011-11-09T23:59:59.000Z

377

GOLF COURSES FRASER RIVER BASIN  

E-Print Network [OSTI]

practices (BMP's) for golf courses, entitled Greening your BC Golf Course. A Guide to Environmental. It also summarizes conditions and practices in the Fraser Basin, reviews best management practices.C. Prepared by: UMA ENVIRONMENTAL A Division of UMA Engineering Ltd. Burnaby, B.C. March 1996 #12;THIRD PARTY

378

Wetlands Standard Dredge and Fill Permit (New Hampshire) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Standard Dredge and Fill Permit (New Hampshire) Standard Dredge and Fill Permit (New Hampshire) Wetlands Standard Dredge and Fill Permit (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Hampshire Program Type Environmental Regulations Provider Department of Environmental Services

379

EIS-0414: Presidential Permit Application, Energia Sierra Juarez  

Broader source: Energy.gov (indexed) [DOE]

14: Presidential Permit Application, Energia Sierra Juarez 14: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California EIS-0414: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California Summary This EIS evaluates the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS. Public Comment Opportunities No public comment opportunities available at this time.

380

Solar Construction Permitting Standards (California) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Standards (California) Standards (California) Solar Construction Permitting Standards (California) < Back Eligibility Commercial Industrial Local Government Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Solar/Wind Permitting Standards Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base the fee for a solar permit on the value of the solar system or the value of the property on which the system will be installed. It also requires the local government to separately identify every fee charged on the invoice provided to the

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

File:03CACEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

CACEncroachmentPermit.pdf CACEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03CACEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 34 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:45, 19 November 2012 Thumbnail for version as of 12:45, 19 November 2012 1,275 × 1,650 (34 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-CA-c - Encroachment Permit

382

File:03UTFEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

UTFEncroachmentPermit.pdf UTFEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03UTFEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 40 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:15, 30 August 2012 Thumbnail for version as of 12:15, 30 August 2012 1,275 × 1,650 (40 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-UT-f - Encroachment Permit

383

File:04AKBGeophysicalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AKBGeophysicalExplorationPermit.pdf AKBGeophysicalExplorationPermit.pdf Jump to: navigation, search File File history File usage File:04AKBGeophysicalExplorationPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 62 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:38, 6 August 2012 Thumbnail for version as of 11:38, 6 August 2012 1,275 × 1,650 (62 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 4-AK-b - Geophysical Exploration Permit

384

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

385

City of Riverhead - Energy Conservation Device Permitting Fees | Department  

Broader source: Energy.gov (indexed) [DOE]

City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 07/01/2005 (retroactive) State New York Program Type Green Building Incentive Provider Building Department In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on residential or commercial buildings. The provision in the town code applies to any energy conservation device "installed in or on a structure which qualifies for any federal, state or local tax exemption, tax credit or tax rebate", but

386

Taxes, Permits, and the Adoption of Abatement Technology under Imperfect  

Open Energy Info (EERE)

Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance Jump to: navigation, search Name Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance Agency/Company /Organization Resources for the Future Sector Energy Topics Market analysis, Technology characterizations Resource Type Publications Website http://www.rff.org/RFF/Documen References Taxes, Permits, and the Adoption of Abatement Technology under Imperfect Compliance[1] Abstract "This paper analyzes the effects of the choice between price-based and quantity-based emissions regulations on compliance incentives and social welfare in the presence of incomplete enforcement and technology adoption. We show that if the regulator does not adjust the level of the policies in

387

Policy for Permitting Low-Emitting Sources (West Virginia) | Department  

Broader source: Energy.gov (indexed) [DOE]

Policy for Permitting Low-Emitting Sources (West Virginia) Policy for Permitting Low-Emitting Sources (West Virginia) Policy for Permitting Low-Emitting Sources (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Siting and Permitting While this policy alleviates some requirements on low-emitting emission sources, it does not change the policy of requiring applicants to submit reasonable information concerning all potential emission sources.

388

Permit by Rule for Small Renewable Energy Projects (Virginia) | Department  

Broader source: Energy.gov (indexed) [DOE]

Permit by Rule for Small Renewable Energy Projects (Virginia) Permit by Rule for Small Renewable Energy Projects (Virginia) Permit by Rule for Small Renewable Energy Projects (Virginia) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Virginia Department of Environmental Quality In 2009, the Virginia General Assembly enacted legislation directing the Virginia Department of Environmental Quality to develop regulations for the construction and operation of renewable energy projects of 100 megawatts

389

File:06IDCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

IDCDrinkingWaterPermit.pdf IDCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06IDCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:14, 29 October 2012 Thumbnail for version as of 08:14, 29 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-ID-c - Drinking Water Permit Retrieved from

390

Disclosure of Permitted Communication Concerning Fossil Fuel Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Disclosure of Permitted Communication Concerning Fossil Fuel Energy Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 This memo provides an overview of communications made to DOE staff on the subject of the rulemaking referenced above. The communications occurred at a meeting held on February 13, 2013. DOE 433 ex parte memo.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No. EERE-2011-BT-CE-0077

391

File:06MTCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

MTCDrinkingWaterPermit.pdf MTCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06MTCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 11 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:11, 1 October 2012 Thumbnail for version as of 11:11, 1 October 2012 1,275 × 1,650 (11 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-MT-c - Drinking Water Permit Retrieved from

392

Comments on RFI on Permitting of Transmission Lines Available | Department  

Broader source: Energy.gov (indexed) [DOE]

Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available April 3, 2012 - 2:12pm Addthis On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The Request for Information focused on making the development times for generation and transmission more commensurate with one another. Public comments received from the following organizations are now available for review and downloading. - Allegheny Highlands Alliance - American Electric Power

393

File:06NVCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

6NVCDrinkingWaterPermit.pdf 6NVCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06NVCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:59, 15 October 2012 Thumbnail for version as of 15:59, 15 October 2012 1,275 × 1,650 (45 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-NV-c - Drinking Water Permit Retrieved from

394

File:06ORCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

6ORCDrinkingWaterPermit.pdf 6ORCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06ORCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 11 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:09, 28 September 2012 Thumbnail for version as of 12:09, 28 September 2012 1,275 × 1,650 (11 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-OR-c - Drinking Water Permit Retrieved from

395

EIS-0463: Presidential Permit Application for Northern Pass Transmission,  

Broader source: Energy.gov (indexed) [DOE]

3: Presidential Permit Application for Northern Pass 3: Presidential Permit Application for Northern Pass Transmission, New Hampshire EIS-0463: Presidential Permit Application for Northern Pass Transmission, New Hampshire Summary This EIS will evaluate the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. The U.S. Forest Service, White Mountain National Forest, and the U.S. Army Corps of Engineers, New England District, are cooperating agencies in the preparation of this EIS. Public Comment Opportunities None available at this time. Documents Available for Download September 18, 2013 EIS-0463: Notice of Public Meeting Location Change

396

Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) | Department  

Broader source: Energy.gov (indexed) [DOE]

Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) Clean Air Interstate Rule (CAIR) Budget Permits (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Siting and Permitting Michigan implements the federal requirements of the Clean Air Interstate Rule (CAIR) through state regulations. Michigan's Rule 821 requires subject sources to obtain and operate in compliance with a CAIR Annual NOx Budget

397

Microsoft Word - Permit Change 10-23-08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New Mexico Environment Department Approves Permit Change for WIPP CARLSBAD, N.M., October 23, 2008 - The New Mexico Environment Department (NMED) today approved a permit change to the U. S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP), which demonstrates that 15 WIPP site locations have been compliant with environmental protection requirements. The permit change eliminates continued sampling and analysis at these locations. Sampling data, collected by DOE over a 10-year period from the 15 locations, indicated that the areas posed no risk to human health or the environment. Last year, DOE submitted a Class 3 permit modification request to NMED to discontinue sampling of the areas, which included a number of mud pits constructed for exploratory boreholes, an evaporation pond and

398

U-093: Mozilla Firefox Multiple Flaws Permit Remote Code Execution,  

Broader source: Energy.gov (indexed) [DOE]

3: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, 3: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, Information Disclosure, and Cross-Site Scripting Attacks U-093: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, Information Disclosure, and Cross-Site Scripting Attacks February 1, 2012 - 5:51am Addthis PROBLEM: Multiple vulnerabilities were reported in Mozilla Firefox. PLATFORM: Linux (Any), UNIX (Any), Windows (Any) Version(s): prior to 3.2.26; prior to 10.0 ABSTRACT: Mozilla Firefox Multiple Flaws Permit Remote Code Execution, Information Disclosure, and Cross-Site Scripting. reference LINKS: SecurityTracker Alert ID: 1026605 CVE-2011-3659, CVE-2012-0442 CVE-2012-0443, CVE-2012-0444 CVE-2012-0445, CVE-2012-0446 CVE-2012-0447, CVE-2012-0449 CVE-2012-0450 Vendor Site IMPACT ASSESSMENT:

399

FWS - Habitat Conservation Plans and Incidental Take Permits...  

Open Energy Info (EERE)

webpage outlines the requirements for incidental take permits from the United States Fish and Wildlife Service. Author U.S. Fish and Wildlife Service Published U.S. Fish and...

400

Subsistence Halibut Special Permits Application Page 1 of 8  

E-Print Network [OSTI]

___________________________________ BLOCK B -- SUBSISTENCE HALIBUT COMMUNITY HARVEST (CHP) PERMIT NOTE: Attach any previously issued CHP harvest logs 1. Name of Alaska Native Tribe or Community 2. Name of CHP Coordinator (First, Middle, Last

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Hawaii Department of Health e-Permitting Portal Webpage | Open...  

Open Energy Info (EERE)

Portal Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Department of Health e-Permitting Portal Webpage Author State of Hawaii...

402

Representing Forecast Error in a Convection-Permitting Ensemble System  

Science Journals Connector (OSTI)

Ensembles provide an opportunity to greatly improve short-term prediction of local weather hazards, yet generating reliable predictions remain a significant challenge. In particular, convection-permitting ensemble forecast systems (CPEFSs) have ...

Glen S. Romine; Craig S. Schwartz; Judith Berner; Kathryn R. Fossell; Chris Snyder; Jeff L. Anderson; Morris L. Weisman

2014-12-01T23:59:59.000Z

403

WAC - 173 - 226 - Waste Discharge General Permit Program | Open...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- RegulationRegulation: WAC - 173 - 226 - Waste Discharge General Permit ProgramLegal Published NA Year Signed or Took Effect 2002...

404

RCRA Hazardous Waste Part A Permit Application: Instructions...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23) Abstract This...

405

Hazardous Waste Part A Permit Application | Open Energy Information  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Hazardous Waste Part A Permit ApplicationLegal Abstract Detailed instructions for filing a RCRA...

406

On-Site Wastewater Treatment Systems: Selecting and Permitting  

E-Print Network [OSTI]

This publication explains factors to consider when choosing an on-site wastewater treatment system and lists the nine steps required to obtain a permit for one. It includes addresses and phone numbers of Texas Natural Resource Conservation...

Lesikar, Bruce J.

2005-04-30T23:59:59.000Z

407

Hawaii Application for Surface Water Use Permit for Proposed...  

Open Energy Info (EERE)

Use Permit for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Hawaii...

408

Montana Stream Permitting Guide Webpage | Open Energy Information  

Open Energy Info (EERE)

Guide Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Stream Permitting Guide Webpage Abstract Provides a guide to required stream...

409

Alaska Air Permit Program Webpage | Open Energy Information  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Air Permit Program Webpage Author Division of Air Quality Published Publisher Not...

410

EPA - Permit Applications and Forms webpage | Open Energy Information  

Open Energy Info (EERE)

Forms webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Permit Applications and Forms webpage Abstract This webpage provides the necessary...

411

EPA Class V Permitting Authorities Website | Open Energy Information  

Open Energy Info (EERE)

Authorities Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA Class V Permitting Authorities Website Abstract Provides overview of Class V...

412

EPA - NPDES Permit Program webpage | Open Energy Information  

Open Energy Info (EERE)

webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - NPDES Permit Program webpage Abstract This is the Environmental Protection Agency's (EPA)...

413

EPA - NPDES Permit Writers Manual | Open Energy Information  

Open Energy Info (EERE)

Writers Manual Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - NPDES Permit Writers Manual Abstract This manual provides an overview of the NPDES...

414

Regulations of the Arkansas Operating Air Permit Program (Arkansas) |  

Broader source: Energy.gov (indexed) [DOE]

Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) < Back Eligibility Commercial Construction Fuel Distributor Industrial Investor-Owned Utility Retail Supplier Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality The Regulations of the Arkansas Air Operating Program are adopted in accordance with the provisions of Part UU of the Arkansas Water and Air Pollution Control Act, Arkansas Code Annotated 8-4-101, and will be referred to in this description as "program", "regulations" and "regulation No. 26". The regulations are intended to meet the requirements of title of

415

City of San Diego - Sustainable Building Expedited Permit Program |  

Broader source: Energy.gov (indexed) [DOE]

San Diego - Sustainable Building Expedited Permit Program San Diego - Sustainable Building Expedited Permit Program City of San Diego - Sustainable Building Expedited Permit Program < Back Eligibility Commercial Industrial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Solar Buying & Making Electricity Program Info Start Date 05/20/2003 State California Program Type Green Building Incentive Provider City of San Diego In 2002, the City of San Diego passed a Resolution R-298001, which amended the [http://dsireusa.org/incentives/incentive.cfm?Incentive_Code=CA42R&re=1&ee=1 Sustainable Building Policy] to allow for expedited permitting for sustainable buildings. Sustainable buildings are defined in Policy Number

416

File:03MTEEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

MTEEncroachmentPermit.pdf MTEEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03MTEEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 19 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:06, 1 October 2012 Thumbnail for version as of 12:06, 1 October 2012 1,275 × 1,650 (19 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-MT-e - Encroachment Permit

417

RRC - Supplemental Application Information for Permit to Maintain...  

Open Energy Info (EERE)

Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit Jump to: navigation, search OpenEI Reference LibraryAdd to library...

418

Compendium of basins for the potential applicability of Jack W. McIntyre`s patented tool  

SciTech Connect (OSTI)

Geraghty & Miller, Inc. of Midland, Texas conducted geological and hydrological feasibility studies of the potential applicability of Jack W. McIntyre`s patented tool for the recovery of natural gas from coalbed formations in the San Juan, Powder River, Greater Green River, Piceance, Black Warrior, Appalachian and Michigan basins. Results from the surveys indicated that geology dominated research efforts for many of the basins. Limited information exists on the hydrology and water quality of the basins. All of the basins contain some potential for the use of Jack McIntyre`s patented production process. This process is designed specifically to separate produced water and produced gas in a downhole environment and may allow for more efficient and economical development of coalbed methane resources in this area.

Reed, P.D.

1994-03-01T23:59:59.000Z

419

Hanford facility dangerous waste permit application, PUREX storage tunnels  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997.

Price, S.M.

1997-09-08T23:59:59.000Z

420

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements  

SciTech Connect (OSTI)

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

French, Sean B [Los Alamos National Laboratory; Johns - Hughes, Kathryn W [Los Alamos National Laboratory

2011-01-21T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Evaluation of Biodiesel Fuels from Supercritical Fluid Processing with the Advanced Distillation Curve Method  

Broader source: Energy.gov [DOE]

Supercritical transesterification processing permits efficient fuel system and combustion chamber designs to optimize fuel utilization in diesel engines.,

422

Sedimentary basin geochemistry and fluid/rock interactions workshop  

SciTech Connect (OSTI)

Fundamental research related to organic geochemistry, fluid-rock interactions, and the processes by which fluids migrate through basins has long been a part of the U.S. Department of Energy Geosciences program. Objectives of this program were to emphasize those principles and processes which would be applicable to a wide range of problems associated with petroleum discovery, occurrence and extraction, waste disposal of all kinds, and environmental management. To gain a better understanding of the progress being made in understanding basinal fluids, their geochemistry and movement, and related research, and to enhance communication and interaction between principal investigators and DOE and other Federal program managers interested in this topic, this workshop was organized by the School of Geology and Geophysics and held in Norman, Oklahoma in November, 1991.

NONE

1991-12-31T23:59:59.000Z

423

Geology of interior cratonic sag basins  

SciTech Connect (OSTI)

Interior cratonic sag basins are thick accumulations of sediment, generally more or less oval in shape, located entirely in the interiors of continental masses. Some are single-cycle basins and others are characterized by repeated sag cycles or are complex polyhistory basins. Many appear to have developed over ancient rift systems. Interior cratonic sag basins are typified by a dominance of flexural over fault-controlled subsidence, and a low ratio of sediment volume to surface area of the basin. The Baltic, Carpentaria, Illinois, Michigan, Parana, Paris, and Williston basins are examples of interior cratonic sag basins. Tectonics played a dominant role in controlling the shapes and the geometries of the juxtaposed packets of sedimentary sequences. While the mechanics of tectonic control are not clear, evidence suggests that the movements are apparently related to convergence of lithospheric plates and collision and breakup of continents. Whatever the cause, tectonic movements controlled the freeboard of continents, altering base level and initiating new tectono-sedimentologic regimes. Sag basins situated in low latitudes during their development commonly were sites of thick carbonates (e.g., Illinois, Michigan, Williston, and Paris basins). In contrast, siliciclastic sedimentation characterized basins that formed in higher latitudes (e.g., Parana and Carpentaria basins). Highly productive sag basins are characterized by widespread, mature, organic-rich source rocks, large structures, and good seals. Nonproductive basins have one or more of the following characteristics: immature source rocks, leaky plumbing, freshwater flushing, and/or complex geology due to numerous intrusions that inhibit mapping of plays.

Leighton, M.W.; Eidel, J.J.; Kolata, D.R.; Oltz, D.F. (Illinois Geological Survey, Champaign (USA))

1990-05-01T23:59:59.000Z

424

File:06UTBStormWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

UTBStormWaterPermit.pdf UTBStormWaterPermit.pdf Jump to: navigation, search File File history File usage File:06UTBStormWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 41 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:16, 30 August 2012 Thumbnail for version as of 12:16, 30 August 2012 1,275 × 1,650 (41 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-UT-b - Storm Water Permit Retrieved from "http://en.openei.org/w/index.php?title=File:06UTBStormWaterPermit.pdf&oldid=509118

425

Abatement of Air Pollution: Permit to Construct and Operate Stationary Sources (Connecticut)  

Broader source: Energy.gov [DOE]

Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements, authorized activities...

426

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

427

V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting...  

Energy Savers [EERE]

V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions V-026: RSA Data Protection Manager Bugs Permit...

428

THE INTRACONTINENTAL BASINS (ICONS) ATLAS APPLICATIONS IN EASTERN AUSTRALIA PESA Eastern Australasian Basins Symposium III Sydney, 1417 September, 2008 275  

E-Print Network [OSTI]

THE INTRACONTINENTAL BASINS (ICONS) ATLAS ­ APPLICATIONS IN EASTERN AUSTRALIA PESA Eastern Australasian Basins Symposium III Sydney, 14­17 September, 2008 275 The IntraCONtinental basinS (ICONS) atlas of intracontinental basins (ICONS atlas), using freely available global and regional datasets. Firstly, we are trying

Müller, Dietmar

429

CD-1: Intracratonic Basin | Open Energy Information  

Open Energy Info (EERE)

thermal conductivity of salt rock, and might provide suitable geothermal reservoirs for district heating.4 Formations encountered in deeper parts of an intracratonic basin...

430

Hack's law of debris-flow basins  

Science Journals Connector (OSTI)

Hack's law was originally derived from basin statistics for varied spatial scales and regions. The exponent value of the law has been shown to vary between 0.47 and 0.70, causing uncertainty in its application. This paper focuses on the emergence of Hack's law from debris-flow basins in China. Over 5,000 debris-flow basins in different regions of China with drainage areas less than 100km2 are included in this study. Basins in the different regions are found to present similar distributions. Hack's law is derived from maximum probability and conditional distributions, suggesting that the law should describe some critical state of basin evolution. Results suggest the exponent value is approximately 0.5. Further analysis indicates that Hack's law is related to other scaling laws underlying the evolution of a basin and that the exponent is not dependent on basin shape but rather on the evolutionary stage. A case study of a well known debris-flow basin further confirms Hack's law and its implications in basin evolution.

Yong LI; Z.Q. YUE; C.F. LEE; R.E. BEIGHLEY; Xiao-Qing CHEN; Kai-Heng HU; Peng CUI

2009-01-01T23:59:59.000Z

431

NMOSE Basin Guidelines | Open Energy Information  

Open Energy Info (EERE)

OtherOther: NMOSE Basin GuidelinesLegal Abstract The New Mexico Office of the State Engineer (NMOSE) provides links to final rules and administrative guidelines for particular...

432

Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb  

Broader source: Energy.gov (indexed) [DOE]

Westinghouse and Fuzhou Permitted to Restart Distribution of Light Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products August 6, 2010 - 4:26pm Addthis The Department has issued Notices of Allowance to Westinghouse Lighting Corporation and Fuzhou Sunlight Lighting Electrical Appliance Company determining, based on corrected test data provided by Westinghouse, that the incandescent reflector lamps listed below are compliant with the federal energy conservation standard and may be sold in the United States. These 11 Westinghouse brand lamps, usually used in recessed light fixtures, correspond to 7 basic models, which are manufactured in China by Fuzhou. DOE had previously issued Notices requiring Fuzhou and Westinghouse to

433

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation  

Broader source: Energy.gov (indexed) [DOE]

42: Reauthorization of Permits, Maintenance, and Vegetation 42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah Summary This EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx.

434

OpenEI Community - water + monitoring + Nevada + permitting  

Open Energy Info (EERE)

Meeting #2 - Meeting #2 - Regulatory Issues http://en.openei.org/community/blog/nevada-meeting-2-regulatory-issues The second Nevada permitting meeting was held Tuesday, July 24th in Reno, and was attended by approximately 15 people from industry and agencies.  Participants reviewed the Nevada Geothermal Regulatory roadmaps that had been reviewed and revised in the first Nevada meeting.  During this meeting, identified potential issues they've encountered in permitting in Nevada. read more http://en.openei.org/community/blog/nevada-meeting-2-regulatory-issues#comments water + monitoring + Nevada + permitting Geothermal Regulatory Roadmap Fri,

435

File:03CODAccessPermit (1).pdf | Open Energy Information  

Open Energy Info (EERE)

CODAccessPermit (1).pdf CODAccessPermit (1).pdf Jump to: navigation, search File File history File usage File:03CODAccessPermit (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 47 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:13, 12 February 2013 Thumbnail for version as of 16:13, 12 February 2013 1,275 × 1,650 (47 KB) Dfitzger (Talk | contribs) 16:12, 7 February 2013 Thumbnail for version as of 16:12, 7 February 2013 1,275 × 1,650 (47 KB) Dfitzger (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

436

File:Archaeology excavation permit.pdf | Open Energy Information  

Open Energy Info (EERE)

Archaeology excavation permit.pdf Archaeology excavation permit.pdf Jump to: navigation, search File File history File usage File:Archaeology excavation permit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 201 KB, MIME type: application/pdf, 7 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:58, 20 November 2012 Thumbnail for version as of 13:58, 20 November 2012 1,275 × 1,650, 7 pages (201 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

437

DOE Hydrogen and Fuel Cells Program: Permitting Hydrogen Facilities Home  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen Fueling Stations Telecommunication Fuel Cell Use Hazard and Risk Analysis U.S. Department of Energy Hydrogen Fueling Stations Telecommunication Fuel Cell Use Hazard and Risk Analysis U.S. Department of Energy The objective of this U.S. Department of Energy Hydrogen Permitting Web site is to help local permitting officials deal with proposed hydrogen fueling stations, fuel cell installations for telecommunications backup power, and other hydrogen projects. Resources for local permitting officials who are looking to address project proposals include current citations for hydrogen fueling stations and a listing of setback requirements on the Alternative Fuels & Advanced Vehicle Data Center Web site. In addition, this overview of telecommunications fuel cell use and an animation that demonstrates telecommunications site layout using hydrogen fuel cells for backup power should provide helpful

438

File:03HICEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

3HICEncroachmentPermit.pdf 3HICEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03HICEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:43, 12 November 2012 Thumbnail for version as of 11:43, 12 November 2012 1,275 × 1,650 (45 KB) Alevine (Talk | contribs) 12:20, 23 October 2012 Thumbnail for version as of 12:20, 23 October 2012 1,275 × 1,650 (50 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

439

File:Permit factsheet.pdf | Open Energy Information  

Open Energy Info (EERE)

Permit factsheet.pdf Permit factsheet.pdf Jump to: navigation, search File File history File usage Metadata File:Permit factsheet.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 31 KB, MIME type: application/pdf, 3 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:50, 12 June 2013 Thumbnail for version as of 10:50, 12 June 2013 1,275 × 1,650, 3 pages (31 KB) Apalazzo (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file.

440

File:03AKELandUsePermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AKELandUsePermit.pdf AKELandUsePermit.pdf Jump to: navigation, search File File history File usage File:03AKELandUsePermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 71 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:00, 18 October 2012 Thumbnail for version as of 11:00, 18 October 2012 1,275 × 1,650 (71 KB) Jnorris (Talk | contribs) 11:35, 6 August 2012 Thumbnail for version as of 11:35, 6 August 2012 1,275 × 1,650 (56 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Hanford facility dangerous waste permit application, general information portion  

SciTech Connect (OSTI)

The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

Hays, C.B.

1998-05-19T23:59:59.000Z

442

State Waste Discharge Permit application: 200-E Powerhouse Ash Pit  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

443

State Waste Discharge Permit application: 200-W Powerhouse Ash Pit  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

Atencio, B.P.

1994-06-01T23:59:59.000Z

444

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

445

T-693: Symantec Endpoint Protection Manager Input Validation Hole Permits  

Broader source: Energy.gov (indexed) [DOE]

3: Symantec Endpoint Protection Manager Input Validation Hole 3: Symantec Endpoint Protection Manager Input Validation Hole Permits Cross-Site Scripting and Cross-Site Request Forgery Attacks T-693: Symantec Endpoint Protection Manager Input Validation Hole Permits Cross-Site Scripting and Cross-Site Request Forgery Attacks August 15, 2011 - 3:42pm Addthis PROBLEM: Two vulnerabilities were reported in Symantec Endpoint Protection Manager. A remote user can conduct cross-site scripting attacks. A remote user can conduct cross-site request forgery attacks. PLATFORM: Version(s): 11.0 RU6(11.0.600x), 11.0 RU6-MP1(11.0.6100), 11.0 RU6-MP2(11.0.6200), 11.0 RU6-MP3(11.0.6300) ABSTRACT: Symantec Endpoint Protection Manager Input Validation Hole Permits Cross-Site Scripting and Cross-Site Request Forgery Attacks. reference LINKS:

446

File:06IDBConstructionStormwaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

6IDBConstructionStormwaterPermit.pdf 6IDBConstructionStormwaterPermit.pdf Jump to: navigation, search File File history File usage File:06IDBConstructionStormwaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:54, 25 October 2012 Thumbnail for version as of 17:54, 25 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) 13:16, 16 August 2012 Thumbnail for version as of 13:16, 16 August 2012 1,275 × 1,650 (13 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

447

Guidelines for acceptable soil concentrations in the old F- and H-Area Retention Basins  

SciTech Connect (OSTI)

Concentration guidelines for residual radionuclides in soil at the sites of the Old F- and H-Area Retention Basins (281-3F, 281-3H) have been calculated using a dose-based approach. The guidelines also are being applied to areas around the F-Basin`s Process Line. Estimation of these soil guidelines was completed using RESRAD 5.0 in accordance with the DOE RESRAD methodology specified in DOE/CH/8901 (Gi89). Guidelines are provided for the nuclides known to be present in the soils at each basin (Sc87). Soil and hydrologic characteristics specific to each basin are defined for the areas above, within, and beneath the contaminated zones.

Hamby, D.M.

1994-04-18T23:59:59.000Z

448

Transient hydrodynamics within intercratonic sedimentary basins during glacial cycles  

E-Print Network [OSTI]

ka B.P.), such as the Williston, Michigan, and Illinois basins. We show that in such basins fluid of the Williston and Alberta basins. Under such con- ditions fluid fluxes in aquifers can be expected

Bense, Victor

449

Flood Zone Building Permits (District of Columbia) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Flood Zone Building Permits (District of Columbia) Flood Zone Building Permits (District of Columbia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State District of Columbia Program Type Environmental Regulations Provider District Department of the Environment

450

CRAD, Engineering - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System...

451

CRAD, Conduct of Operations - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System May 2004 A...

452

CRAD, Management - Office of River Protection K Basin Sludge...  

Broader source: Energy.gov (indexed) [DOE]

CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Conduct of Operations - Office of River Protection K Basin Sludge Waste System CRAD,...

453

CRAD, Emergency Management - Office of River Protection K Basin...  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A section...

454

Refraction Survey At Northern Basin & Range Region (Heimgartner...  

Open Energy Info (EERE)

Northern Basin & Range Region (Heimgartner, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Northern Basin &...

455

Geographic Information System At Northern Basin & Range Region...  

Open Energy Info (EERE)

Activity: Geographic Information System At Northern Basin & Range Region (Nash & Johnson, 2003) Exploration Activity Details Location Northern Basin and Range Geothermal...

456

Geographic Information System At Nw Basin & Range Region (Nash...  

Open Energy Info (EERE)

Geographic Information System At Nw Basin & Range Region (Nash & Johnson, 2003) Exploration Activity Details Location Northwest Basin and Range Geothermal Region Exploration...

457

Problems of phytostratigraphy and the correlation of the Lower Jurassic continental sediments in West Siberia and Kuznetsk and Kansk-Achinsk basins  

SciTech Connect (OSTI)

Paleofloral and palynological records of Lower Jurassic sediments in West Siberia, Kuznetsk (Kuzbass), and Kansk-Achinsk basins and their correlation are discussed. In a number of recent papers dedicated to the Jurassic stratigraphy of Siberia this problem is ambiguously treated. The reference palynological scale has been developed for the Jurassic West Siberian sediments and an uninterrupted succession of floral assemblages associated with it and with regional stratigraphic units has been recognized. On this basis the scheme of the correlation between the Lower Jurassic sediments of the Kansk-Achinsk and Kuznetsk basins and West Siberia permitting a better age estimate of coal-bearing deposits, is proposed.

Mogutcheva, N.K. [Siberian Research Institute of Geology, Geophysics & Mineral Resource, Novosibirsk (Russian Federation)

2009-06-15T23:59:59.000Z

458

File:OperatingPermitCheckList.pdf | Open Energy Information  

Open Energy Info (EERE)

OperatingPermitCheckList.pdf OperatingPermitCheckList.pdf Jump to: navigation, search File File history File usage File:OperatingPermitCheckList.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 28 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:27, 13 November 2012 Thumbnail for version as of 13:27, 13 November 2012 1,275 × 1,650 (28 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:OperatingPermitCheckList.pdf&oldid=536405

459

File:03IDFLandUsePermit.pdf | Open Energy Information  

Open Energy Info (EERE)

IDFLandUsePermit.pdf IDFLandUsePermit.pdf Jump to: navigation, search File File history File usage File:03IDFLandUsePermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:41, 25 October 2012 Thumbnail for version as of 17:41, 25 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Flowcharts Retrieved from "http://en.openei.org/w/index.php?title=File:03IDFLandUsePermit.pdf&oldid=530963

460

Permitting plan for the high-level waste interim storage  

SciTech Connect (OSTI)

This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

Deffenbaugh, M.L.

1997-04-23T23:59:59.000Z

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)  

SciTech Connect (OSTI)

The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

Young, K. R.; Levine, A.

2014-09-01T23:59:59.000Z

462

State Waste Discharge Permit application, 183-N Backwash Discharge Pond  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

Not Available

1994-06-01T23:59:59.000Z

463

The use of transferable permits in transport policy Charles Raux  

E-Print Network [OSTI]

geographical areas, and schemes applied to automakers for unitary vehicle emissions are also viable. Keywords), and the rapidly growing use of older in developing countries is a major source of air pollution in urbanized areas) on regulating water use, and the formalization of pollution permit markets by Montgomery (1972). According

Boyer, Edmond

464

File:Encroach permit.pdf | Open Energy Information  

Open Energy Info (EERE)

Encroach permit.pdf Encroach permit.pdf Jump to: navigation, search File File history File usage File:Encroach permit.pdf Size of this preview: 364 × 600 pixels. Go to page 1 2 3 4 5 6 7 Go! next page → next page → Full resolution ‎(1,275 × 2,100 pixels, file size: 164 KB, MIME type: application/pdf, 7 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 19:01, 26 November 2012 Thumbnail for version as of 19:01, 26 November 2012 1,275 × 2,100, 7 pages (164 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Encroach_permit.pdf&oldid=539501

465

Ecology: Drought in the Congo Basin  

Science Journals Connector (OSTI)

... significantly expanded the tropical-forest research programme by focusing on chronic drought in Africa's Congo Basin, a region that has been the subject of much less investigation than the ... optical, microwave and gravity remote-sensing data to evaluate long-term drought response in the Congo Basin (Fig. 1). Annual precipitation in this region is bimodal, and the ...

Jeffrey Q. Chambers; Dar A. Roberts

2014-04-23T23:59:59.000Z

466

6, 839877, 2006 Mexico City basin  

E-Print Network [OSTI]

emitters of air pollutants leading to negative health effects and environmental degradation. The rate altitude basin with air pollutant concentrations above the health limits most days of the year. A mesoscale-dimensional wind patterns in25 the basin and found that the sea-breeze transports the polluted air mass up the moun

Boyer, Edmond

467

Air Pollution Control Regulations: No. 9- Air Pollution Control Permits (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations describe permitting procedures and requirements for minor and major sources of emissions.

468

Dissertation Permit Form Revised 09/09 CSE Ph.D. ADVISOR SELECTION AND PRE-DISSERTATION (8999) PERMIT FORM  

E-Print Network [OSTI]

Dissertation Permit Form­ Revised 09/09 CSE Ph.D. ADVISOR SELECTION AND PRE-DISSERTATION (8999) hours, you must have a permanent advisor and have not passed the qualifier. You must complete this form in consultation with your dissertation advisor. Bring the signed form to the Academic Advisor in Computational

Gray, Alexander

469

How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year  

E-Print Network [OSTI]

How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year 15,000 yen the permit on the fender of your bike where it can be seen easily. Application Procedures Bicycle Permit Motorcycle Permit Bicycle Permit Motorcycle Permit Dai-ni Koubaibu Store: Weekdays 10 00 19 00 Nougakubu

Miyashita, Yasushi

470

Groundwater model recalibration and remediation well network design at the F-Area Seepage Basins  

SciTech Connect (OSTI)

On September 30, 1992, the South Carolina Department of Health and Environmental Control (SCDHEC) issued a Resource Conservation and Recovery Act (RCRA) Hazardous Waste Part B Permit prescribing remediation of contaminated groundwater beneath and downgradient of the F- and H-Area Seepage Basins at the Savannah River Site. The remediation outlined in the Part B Permit calls for a three phase approach. For the F-Area Seepage Basins, the first phase requires the ``installation of an adequate number of pumping and injection wells or trenches, as appropriate, to capture and remediate those portions of-the contaminant plume delineated by the 10,000 pCi/ml tritium isoconcentration contour.`` Geochemical results from 1992 groundwater monitoring were used to delineate this isoconcentration contour in the Corrective Action Program (CAP) (WSRC, 1992a). The 1992 results were used based on SCDHEC written requirement to use the most recent data available at the time the CAP was formulated. The rationale used by SCDHEC in selecting the 10,000 pCi/ml tritium isoconcentration contour was that it also encompassed most of the other contaminants listed in the Groundwater Protection Standards. After extraction and treatment, the water is required to be reinjected into the aquifer due to the high levels of tritium still present in the treated water. The conceptual plan is to have recirculation of the tritium (as much as can practically be accomplished) to allow more time for radioactive decay before natural discharge to surface water.

Sadler, W.R.

1995-04-01T23:59:59.000Z

471

Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

NONE

1997-05-01T23:59:59.000Z

472

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-09-30T23:59:59.000Z

473

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2003-09-30T23:59:59.000Z

474

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2005-09-30T23:59:59.000Z

475

PRESIDENTIAL PERMIT NORTHERN STATES POWER COMPANY ORDER NO. PP-231  

Broader source: Energy.gov (indexed) [DOE]

NORTHERN STATES POWER COMPANY NORTHERN STATES POWER COMPANY ORDER NO. PP-231 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, operation, maintenance, and connection of electric transmission facilities at the United States international border. On November 2, 2000, Northern States Power Company (NSP) filed an application with the Office of Fossil Energy (FE) of the Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect an electric transmission line that would cross the U.S. border with Canada. NSP, doing business as Excel Energy Incorporated (Xcel), proposes to

476

T-623: HP Business Availability Center Input Validation Hole Permits  

Broader source: Energy.gov (indexed) [DOE]

3: HP Business Availability Center Input Validation Hole 3: HP Business Availability Center Input Validation Hole Permits Cross-Site Scripting Attacks T-623: HP Business Availability Center Input Validation Hole Permits Cross-Site Scripting Attacks May 16, 2011 - 3:05pm Addthis PROBLEM: A vulnerability was reported in HP Business Availability Center. A remote user can conduct cross-site scripting attacks. PLATFORM: HP Business Availability Center software 8.06 and prior versions ABSTRACT: The software does not properly filter HTML code from user-supplied input before displaying the input. reference LINKS: SecurityTracker Alert ID:1025535 HP Knowledge Base CVE-2011-1856 Secunia ID: SA44569 HP Document ID:c02823184 | ESB-2011.0525 IMPACT ASSESSMENT: High Discussion: A remote user can cause arbitrary scripting code to be executed by the

477

V-192: Symantec Security Information Manager Input Validation Flaws Permit  

Broader source: Energy.gov (indexed) [DOE]

92: Symantec Security Information Manager Input Validation Flaws 92: Symantec Security Information Manager Input Validation Flaws Permit Cross-Site Scripting, SQL Injection, and Information Disclosure Attacks V-192: Symantec Security Information Manager Input Validation Flaws Permit Cross-Site Scripting, SQL Injection, and Information Disclosure Attacks July 4, 2013 - 6:00am Addthis PROBLEM: Several vulnerabilities were reported in Symantec Security Information Manager PLATFORM: Symantec Security Information Manager Appliance Version 4.7.x and 4.8.0 ABSTRACT: Symantec was notified of multiple security issues impacting the SSIM management console REFERENCE LINKS: SecurityTracker Alert ID: 1028727 Symantec Security Advisory SYM13-006 CVE-2013-1613 CVE-2013-1614 CVE-2013-1615 IMPACT ASSESSMENT: Medium DISCUSSION: The console does not properly filter HTML code from user-supplied input

478

File:06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf | Open  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search File Edit History Facebook icon Twitter icon » File:06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Jump to: navigation, search File File history File usage Metadata File:06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 21 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:08, 27 June 2013 Thumbnail for version as of 12:08, 27 June 2013 1,275 × 1,650 (21 KB) Alevine (Talk | contribs)

479

State of Tennessee Hazardous Waste Management Permit, TNHW-127  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Class 1 1 Modification, Dated: 10/20/06 TABLE OF CONTENTS U.S. DEPARTMENT OF ENERGY, Y-12 NATIONAL SECURITY COMPLEX OAK RIDGE, TENNESSEE HAZARDOUS WASTE CONTAINER STORAGE AND TREATMENT UNITS BUILDINGS 9206, 9212, 9720-12, 9811-9, AND 9812 AND THE ORGANIC HANDLING UNIT EPA ID NUMBER: TN3 89 009 0001 Page Number I. STANDARD CONDITIONS A. EFFECT OF PERMIT I-1 B. SEVERABILITY I-1 C. DEFINITIONS I-2 D. GENERAL DUTIES AND REQUIREMENTS I-4 E. CONFIDENTIAL INFORMATION I-10 F. DOCUMENTS TO BE MAINTAINED AT THE FACILITY I-10 G. ANNUAL MAINTENANCE FEE I-10 H. REQUIRED NOTICES I-10 I. ORDER OF PRECEDENCE I-11 J. PERMIT STRUCTURE I-11 II. GENERAL FACILITY CONDITIONS A. HAZARDOUS WASTES TO BE MANAGED II-1 B. MAINTENANCE OF THE FACILITY II-1

480

State of Tennessee Hazardous Waste Management Permit, TNHW-122  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Class 1 1 Modification, Dated: 12/18/06 TABLE OF CONTENTS U.S. DEPARTMENT OF ENERGY, Y-12 NATIONAL SECURITY COMPLEX OAK RIDGE, TENNESSEE HAZARDOUS WASTE CONTAINER STORAGE AND TREATMENT UNITS BUILDINGS 9720-9, 9720-25, AND 9720-31 EPA ID NUMBER: TN3 89 009 0001 Page Number I. STANDARD CONDITIONS A. EFFECT OF PERMIT I-1 B. SEVERABILITY I-1 C. DEFINITIONS I-2 D. GENERAL DUTIES AND REQUIREMENTS I-4 E. CONFIDENTIAL INFORMATION I-10 F. DOCUMENTS TO BE MAINTAINED AT THE FACILITY I-10 G. ANNUAL MAINTENANCE FEE I-10 H. REQUIRED NOTICES I-10 I. ORDER OF PRECEDENCE I-11 J. PERMIT STRUCTURE I-11 II. GENERAL FACILITY CONDITIONS A. HAZARDOUS WASTES TO BE MANAGED II-1 B. MAINTENANCE OF THE FACILITY II-1 C. SAMPLING, ANALYSIS, AND MONITORING II-1

Note: This page contains sample records for the topic "basin permitting process" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

State Waste Discharge Permit application, 100-N Sewage Lagoon  

SciTech Connect (OSTI)

As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

Not Available

1994-06-01T23:59:59.000Z

482

File:06UTCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

UTCDrinkingWaterPermit.pdf UTCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage Metadata File:06UTCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:52, 2 April 2013 Thumbnail for version as of 15:52, 2 April 2013 1,275 × 1,650 (45 KB) Dfitzger (Talk | contribs) 12:17, 30 August 2012 Thumbnail for version as of 12:17, 30 August 2012 1,275 × 1,650 (32 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

483

File:06ORATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

ORATransportationPermit.pdf ORATransportationPermit.pdf Jump to: navigation, search File File history File usage File:06ORATransportationPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 96 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 00:32, 4 November 2012 Thumbnail for version as of 00:32, 4 November 2012 1,275 × 1,650, 2 pages (96 KB) Dfitzger (Talk | contribs) 13:07, 28 September 2012 Thumbnail for version as of 13:07, 28 September 2012 1,275 × 1,650, 2 pages (65 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file.

484

File:Permit2012.pdf | Open Energy Information  

Open Energy Info (EERE)

Permit2012.pdf Permit2012.pdf Jump to: navigation, search File File history File usage File:Permit2012.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 155 KB, MIME type: application/pdf, 26 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:16, 20 November 2012 Thumbnail for version as of 14:16, 20 November 2012 1,275 × 1,650, 26 pages (155 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

485

File:EnergyResourcePermittingNV.pdf | Open Energy Information  

Open Energy Info (EERE)

EnergyResourcePermittingNV.pdf EnergyResourcePermittingNV.pdf Jump to: navigation, search File File history File usage File:EnergyResourcePermittingNV.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 97 KB, MIME type: application/pdf, 11 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:16, 15 October 2012 Thumbnail for version as of 11:16, 15 October 2012 1,275 × 1,650, 11 pages (97 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

486

File:06AKCDrinkingWaterPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

AKCDrinkingWaterPermit.pdf AKCDrinkingWaterPermit.pdf Jump to: navigation, search File File history File usage File:06AKCDrinkingWaterPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 40 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:58, 30 October 2012 Thumbnail for version as of 11:58, 30 October 2012 1,275 × 1,650 (40 KB) Dklein2012 (Talk | contribs) 11:31, 18 October 2012 Thumbnail for version as of 11:31, 18 October 2012 1,275 × 1,650 (11 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

487

File:04AKCGeothermalExplorationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

4AKCGeothermalExplorationPermit.pdf 4AKCGeothermalExplorationPermit.pdf Jump to: navigation, search File File history File usage File:04AKCGeothermalExplorationPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 31 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:12, 7 August 2012 Thumbnail for version as of 08:12, 7 August 2012 1,275 × 1,650 (31 KB) Jnorris (Talk | contribs) 10:38, 6 August 2012 Thumbnail for version as of 10:38, 6 August 2012 1,275 × 1,650 (29 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

488

File:06NVATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

NVATransportationPermit.pdf NVATransportationPermit.pdf Jump to: navigation, search File File history File usage File:06NVATransportationPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 61 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:58, 11 October 2012 Thumbnail for version as of 14:58, 11 October 2012 1,275 × 1,650 (61 KB) Dklein2012 (Talk | contribs) 13:30, 23 July 2012 Thumbnail for version as of 13:30, 23 July 2012 1,275 × 1,650 (45 KB) Dklein2012 (Talk | contribs) 10:32, 12 July 2012 Thumbnail for version as of 10:32, 12 July 2012 1,275 × 1,650 (45 KB) Jnorris (Talk | contribs)

489

File:06 - ConstructionPermitsOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

ConstructionPermitsOverview.pdf ConstructionPermitsOverview.pdf Jump to: navigation, search File File history File usage Metadata File:06 - ConstructionPermitsOverview.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 70 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:03, 12 July 2013 Thumbnail for version as of 12:03, 12 July 2013 1,275 × 1,650, 2 pages (70 KB) Apalazzo (Talk | contribs) 12:01, 12 July 2013 Thumbnail for version as of 12:01, 12 July 2013 1,275 × 1,650, 3 pages (115 KB) Apalazzo (Talk | contribs) 14:28, 30 October 2012 Thumbnail for version as of 14:28, 30 October 2012 1,275 × 1,650, 2 pages (83 KB) Dklein2012 (Talk | contribs)

490

File:06CAATransportationPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

CAATransportationPermit.pdf CAATransportationPermit.pdf Jump to: navigation, search File File history File usage Metadata File:06CAATransportationPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 32 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 09:32, 29 March 2013 Thumbnail for version as of 09:32, 29 March 2013 1,275 × 1,650 (32 KB) Alevine (Talk | contribs) 12:24, 12 September 2012 Thumbnail for version as of 12:24, 12 September 2012 1,275 × 1,650 (46 KB) Djenne (Talk | contribs) 15:51, 26 June 2012 Thumbnail for version as of 15:51, 26 June 2012 1,275 × 1,650 (44 KB) Jnorris (Talk | contribs) June 26th version

491

File:03IDCEncroachmentPermit.pdf | Open Energy Information  

Open Energy Info (EERE)

IDCEncroachmentPermit.pdf IDCEncroachmentPermit.pdf Jump to: navigation, search File File history File usage File:03IDCEncroachmentPermit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 57 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 10:58, 17 August 2012 Thumbnail for version as of 10:58, 17 August 2012 1,275 × 1,650, 2 pages (57 KB) Alevine (Talk | contribs) 14:11, 16 August 2012 Thumbnail for version as of 14:11, 16 August 2012 1,275 × 1,650, 2 pages (63 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

492

File:04HIAExplorationPermit (1).pdf | Open Energy Information  

Open Energy Info (EERE)

HIAExplorationPermit (1).pdf HIAExplorationPermit (1).pdf Jump to: navigation, search File File history File usage Metadata File:04HIAExplorationPermit (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 38 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:42, 12 July 2013 Thumbnail for version as of 13:42, 12 July 2013 1,275 × 1,650 (38 KB) Alevine (Talk | contribs) 13:34, 12 July 2013 Thumbnail for version as of 13:34, 12 July 2013 1,275 × 1,650 (36 KB) Alevine (Talk | contribs) 15:43, 2 July 2013 Thumbnail for version as of 15:43, 2 July 2013 1,275 × 1,650 (40 KB) Alevine (Talk | contribs)

493

File:05DrillingPermittingOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

DrillingPermittingOverview.pdf DrillingPermittingOverview.pdf Jump to: navigation, search File File history File usage File:05DrillingPermittingOverview.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 54 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:27, 30 October 2012 Thumbnail for version as of 14:27, 30 October 2012 1,275 × 1,650 (54 KB) Dklein2012 (Talk | contribs) 15:59, 25 October 2012 Thumbnail for version as of 15:59, 25 October 2012 1,275 × 1,650 (54 KB) Dklein2012 (Talk | contribs) 15:21, 11 September 2012 Thumbnail for version as of 15:21, 11 September 2012 1,275 × 1,650 (33 KB) Djenne (Talk | contribs) Reverted to version as of 19:08, 11 July 2012

494

Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 Mark Person*1  

E-Print Network [OSTI]

: Mount Simon, Illinois Basin, CO2, earthquakes, pressure, brine transport69 #12;Page | 3 1. IntroductionPage | 1 Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 2 3 4 sharp-interface models of CO2 injection were constructed for the Illinois49 Basin in which porosity

Gable, Carl W.

495

Utilizing geographic information systems technology in the Wyoming cumulative hydrologic impact assessment modeling process  

SciTech Connect (OSTI)

The coal-permitting process places heavy demands on both permit applicants and regulatory authorities with respect to the management and analysis of hydrologic data. Currently, this correlation is being addressed for the Powder River Basin, Wyoming by the ongoing Cumulative Hydrologic Impact Assessment (CHIA) efforts at the University of Wyoming. One critical component of the CHIA is the use of a Geographic Information System (GIS) for support, management, manipulation, pre-analysis, and display of data associated with the chosen groundwater and surface water models. This paper will discuss the methodology in using of GIS technology as an integrated tool with the MODFLOW and HEC-1 hydrologic models. Pre-existing GIS links associated with these two models served as a foundation for this effort. However, due to established standards and site specific factors, substantial modifications were performed on existing tools to obtain adequate results. The groundwater-modeling effort required the use of a refined grid in which cell sizes varied based on the relative locations of ongoing mining activities. Surface water modeling was performed in a semi-arid region with very limited topographic relief and predominantly ephemeral stream channels. These were substantial issues that presented challenges for effective GIS/model integration.

Hamerlinck, J.D.; Oakleaf, J.R. [Univ. of Wyoming, Laramie, WY (United States)

1997-12-31T23:59:59.000Z

496

Death of a carbonate basin: The Niagara-Salina transition in the Michigan basin  

SciTech Connect (OSTI)

The A-O Carbonate in the Michigan basin comprises a sequence of laminated calcite/anhydrite layers intercalated with bedded halite at the transition between normal marine Niagaran carbonates and lower Salina Group evaporites. The carbonate/anhydrite interbeds represent freshing events during initial evaporative concentration of the Michigan basin. Recent drilling in the Michigan basin delineates two distinct regions of A-O Carbonate development: a 5 to 10 m thick sequence of six 'laminites' found throughout most of the western and northern basin and a 10 to 25 m thick sequence in the southeastern basin containing both thicker 'laminates' and thicker salt interbeds. Additionally, potash deposits of the overlying A-1 evaporite unit are restricted to the northern and western basin regions. The distribution of evaporite facies in these two regions is adequately explained by a source of basin recharge in the southeast-perhaps the 'Clinton Inlet' of earlier workers. This situation suggest either that: (1) the source of basin recharge is alternately supplying preconcentrated brine and more normal marine water, or (2) that the basin received at least two distinct sources of water during A-O deposition.

Leibold, A.W.; Howell, P.D. (Univ. of Michigan, Ann Arbor (United States))

1991-03-01T23:59:59.000Z

497

Hinsdale Wave Basin 1 | Open Energy Information  

Open Energy Info (EERE)

Hinsdale Wave Basin 1 Hinsdale Wave Basin 1 Jump to: navigation, search Basic Specifications Facility Name Hinsdale Wave Basin 1 Overseeing Organization Oregon State University Hydrodynamics Hydrodynamic Testing Facility Type Wave Basin Length(m) 104.0 Beam(m) 3.7 Depth(m) 4.6 Cost(per day) $3500 Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 1.8 Maximum Wave Height(m) at Wave Period(s) 10.0 Wave Period Range(s) 10.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Monochromatic waves (cnoidal, Stokes, Airy), solitary waves, user-defined free surface timeseries or board displacement timeseries for random waves Wave Direction Uni-Directional Simulated Beach Yes Description of Beach 12' by 12' concrete slabs anchored to flume walls

498

K Basins Sludge Treatment Project Phase 1  

Broader source: Energy.gov (indexed) [DOE]

K Basins Sludge Treatment Project Phase 1 K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment Report Herb G. Sutter Michael Poirier Art W. Etchells Gary Smith Kris Thomas Jim J. Davis Paul Macbeth November 16, 2009 Prepared by the U.S. Department of Energy Washington, D.C. K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment Report November 16, 2009 ii Herbert G. Sutter, Team Lead Date Michael Poirier, Team Member Date Arthur W. Etchells, Team Member Date Gary Smith, Team Member Date Kris Thomas, Team Member Date Jim J. Davis, Team Member Date Paul Macbeth, Team Member Date Signatures 11/09/2009 11/09/2009 11/09/2009 K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment Report November 16, 2009

499

Alden Wave Basin | Open Energy Information  

Open Energy Info (EERE)

Wave Basin Wave Basin Jump to: navigation, search Basic Specifications Facility Name Alden Wave Basin Overseeing Organization Alden Research Laboratory, Inc Hydrodynamic Testing Facility Type Wave Basin Length(m) 33.5 Beam(m) 21.3 Depth(m) 1.2 Water Type Freshwater Cost(per day) Depends on study Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.3 Maximum Wave Height(m) at Wave Period(s) 1.0 Maximum Wave Length(m) 1.8 Wave Period Range(s) 1.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wavemaking Description Period adjustable electronically, height adjustable mechanically Wave Direction Both Simulated Beach Yes Description of Beach Designed as needed using commercially available sand/sediment

500

Progress Update: H4 Basin Concrete Pour  

ScienceCinema (OSTI)

The Recovery Act funded project in the H area basin. A concrete ditch built longer than half a mile to prevent contaminated water from expanding and to reduce the footprint on the environment.

None

2012-06-14T23:59:59.000Z