National Library of Energy BETA

Sample records for basin permitting process

  1. Distributed PV Permitting and Inspection Processes

    Broader source: Energy.gov [DOE]

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  2. Source Water and Groundwater Withdrawal Permit Application Process...

    Open Energy Info (EERE)

    Source Water and Groundwater Withdrawal Permit Application Process Guidance Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  3. Geothermal policy development program: expediting the local geothermal permitting process

    SciTech Connect (OSTI)

    Not Available

    1981-07-01

    For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

  4. Model operating permits for natural gas processing plants

    SciTech Connect (OSTI)

    Arend, C. [Hydro-Search, Inc., Houston, TX (United States)

    1995-12-31

    Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

  5. Expedited Permitting Process for Solar Photovoltaic Systems (Vermont)

    Broader source: Energy.gov [DOE]

    Vermont has established an expedited permitting process for solar photovoltaic systems that are 10 kilowatts-AC (kW) or less. In order to interconnect and net meter, electric customers in Vermont...

  6. File:06COAExtraLegalVehiclePermittingProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    traLegalVehiclePermittingProcess.pdf Jump to: navigation, search File File history File usage Metadata File:06COAExtraLegalVehiclePermittingProcess.pdf Size of this preview: 463 ...

  7. City of Anaheim This page outlines solar PV incentives, financing mechanisms, permitting process, and

    E-Print Network [OSTI]

    City of Anaheim This page outlines solar PV incentives, financing mechanisms, permitting process Apply for local permits Install your PV system Arrange for your PV system to be interconnected to your

  8. INTEC CPP-603 Basin Water Treatment System Closure: Process Design

    SciTech Connect (OSTI)

    Kimmitt, Raymond Rodney; Faultersack, Wendell Gale; Foster, Jonathan Kay; Berry, Stephen Michael

    2002-09-01

    This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.

  9. Patterns and processes of wood debris accumulation in the Queets river basin, Washington

    E-Print Network [OSTI]

    Montgomery, David R.

    Patterns and processes of wood debris accumulation in the Queets river basin, Washington Tim B Mountains in NW Washington reveal basin-wide patterns of distinctive wood debris (WD) accumulations development. The classification of wood debris accumulations in the Queets river basin is based on physical

  10. City of Palmdale This page outlines solar PV incentives, financing mechanisms, permitting process, and

    E-Print Network [OSTI]

    ) Programs o Commercial PACE · The Los Angeles County PACE program offers funding for nonresidential solarCity of Palmdale This page outlines solar PV incentives, financing mechanisms, permitting process solar energy system for your home or business. o Typically solar installers will: Locate financing

  11. City of Long Beach This page outlines solar PV incentives, financing mechanisms, permitting process, and

    E-Print Network [OSTI]

    ) Programs o Commercial PACE · The Los Angeles County PACE program offers funding for nonresidential solarCity of Long Beach This page outlines solar PV incentives, financing mechanisms, permitting process;Find an Installer · Qualified contractors are your key to getting the most productive solar energy

  12. General Permit General Permit

    E-Print Network [OSTI]

    L General Permit Parking LOT A General Permit Parking LOT C General Permit Parking LOT R Reserved Parking LOT D Faculty/Staff Parking LOT K General Permit Parking LOT J Reserved Parking PV LOT General Parking after 3 p.m. WEST CAMPUS PARKING LOT O General Permit Parking LOT M General Permit Parking LOT P

  13. General Permit General Permit

    E-Print Network [OSTI]

    98 28 28 60 96 31 7 23 LOT L General Permit Parking LOT A General Permit Parking LOT C General Permit Parking LOT R Reserved Parking LOT D Faculty/Staff Parking LOT K General Permit Parking LOT J Reserved Parking PV LOT General Parking after 3 p.m. WEST CAMPUS PARKING LOT O General Permit Parking LOT M General

  14. Data requirements for valuing externalities: The role of existing permitting processes

    SciTech Connect (OSTI)

    Lee, A.D.; Baechler, M.C.; Callaway, J.M.

    1990-08-01

    While the assessment of externalities, or residual impacts, will place new demands on regulators, utilities, and developers, existing processes already require certain data and information that may fulfill some of the data needs for externality valuation. This paper examines existing siting, permitting, and other processes and highlights similarities and differences between their data requirements and the data required to value environmental externalities. It specifically considers existing requirements for siting new electricity resources in Oregon and compares them with the information and data needed to value externalities for such resources. This paper also presents several observations about how states can take advantage of data acquired through processes already in place as they move into an era when externalities are considered in utility decision-making. It presents other observations on the similarities and differences between the data requirements under existing processes and those for valuing externalities. This paper also briefly discusses the special case of cumulative impacts. And it presents recommendations on what steps to take in future efforts to value externalities. 35 refs., 2 tabs.

  15. Modeling basin- and plume-scale processes of CO2 storage for full-scale deployment

    SciTech Connect (OSTI)

    Zhou, Q.; Birkholzer, J.T.; Mehnert, E.; Lin, Y.-F.; Zhang, K.

    2009-08-15

    Integrated modeling of basin- and plume-scale processes induced by full-scale deployment of CO{sub 2} storage was applied to the Mt. Simon Aquifer in the Illinois Basin. A three-dimensional mesh was generated with local refinement around 20 injection sites, with approximately 30 km spacing. A total annual injection rate of 100 Mt CO{sub 2} over 50 years was used. The CO{sub 2}-brine flow at the plume scale and the single-phase flow at the basin scale were simulated. Simulation results show the overall shape of a CO{sub 2} plume consisting of a typical gravity-override subplume in the bottom injection zone of high injectivity and a pyramid-shaped subplume in the overlying multilayered Mt. Simon, indicating the important role of a secondary seal with relatively low-permeability and high-entry capillary pressure. The secondary-seal effect is manifested by retarded upward CO{sub 2} migration as a result of multiple secondary seals, coupled with lateral preferential CO{sub 2} viscous fingering through high-permeability layers. The plume width varies from 9.0 to 13.5 km at 200 years, indicating the slow CO{sub 2} migration and no plume interference between storage sites. On the basin scale, pressure perturbations propagate quickly away from injection centers, interfere after less than 1 year, and eventually reach basin margins. The simulated pressure buildup of 35 bar in the injection area is not expected to affect caprock geomechanical integrity. Moderate pressure buildup is observed in Mt. Simon in northern Illinois. However, its impact on groundwater resources is less than the hydraulic drawdown induced by long-term extensive pumping from overlying freshwater aquifers.

  16. Industrial Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the National Pollutant Discharge Elimination System....

  17. File:06TXAExtraLegalVehiclePermittingProcess.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump

  18. City of Santa Monica This page outlines solar PV incentives, financing mechanisms, permitting process, and interconnection

    E-Print Network [OSTI]

    ) Programs o Commercial PACE · The Los Angeles County PACE program offers funding for nonresidential solarCity of Santa Monica This page outlines solar PV incentives, financing mechanisms, permitting contractors are your key to getting the most productive solar energy system for your home or business. o

  19. Appendix F. Air Permits Appendix F. Air Permits F-3

    E-Print Network [OSTI]

    Pennycook, Steve

    Appendix F. Air Permits #12;#12;Appendix F. Air Permits F-3 Table F.1. Air Permits at the Y-12 Chemical Process Operation 01-0020-21 554701 Air Bearing Operation 01-0020-05 554701 Special Processing Purification Facility #12;Oak Ridge Reservation F-4 Appendix F. Air Permits Table F.2. Oak Ridge National

  20. Groundwater availability and flow processes in the Williston and Powder River basins in the Northern Great Plains

    E-Print Network [OSTI]

    Torgersen, Christian

    Groundwater availability and flow processes in the Williston and Powder River basins Center, Cheyenne, WY 4 Office of Groundwater, Denver, CO 5 Oklahoma Water Science Center, Oklahoma City in Montana and Wyoming, provides an opportunity to study the water-energy nexus within a groundwater context

  1. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  2. Appendix E. Air Permits Appendix E. Air Permits E-3

    E-Print Network [OSTI]

    Pennycook, Steve

    Appendix E. Air Permits #12;#12;Appendix E. Air Permits E-3 Table E.1. Air permits at the Y-12 Chemical Process Operation 01-0020-21 554701 Air Bearing Operation 01-0020-05 554701 Special Processing Operation 01-0020-68 554701 Disassembly and Storage Operation #12;Oak Ridge Reservation E-4 Appendix E. Air

  3. Washington Environmental Permit Handbook - NPDES Individual Permit...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - NPDES Individual Permit Coverage Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  4. Solar Permitting Law

    Broader source: Energy.gov [DOE]

    This legislation also addressed permitting fees for solar systems.  Counties and cities may not charge permit fees for solar permit applications specifically, but they can charge building permit ...

  5. RESULTS OF GROUNDWATER MONITORING FOR THE 183-H SOLAR EVAPORATION BASINS AND 300 AREA PROCESS TRENCHES JANUARY-JUNE 2010

    SciTech Connect (OSTI)

    WEEKES, D. C.

    2010-11-07

    This is one of a series of reports on Resource Conservation and Recovery Act of 1976 monitoring at the 183-H Solar Evaporation Basins and the 300 Area Process Trenches. It fulfills the requirement of Washington Administrative Code (WAC) 173-303-645(11) to report twice each year on the effectiveness of the corrective action program. This report covers the period from January through June 2010. The concentrations of 183-H Solar Evaporation Basins contaminants remained below applicable concentration limits during the reporting period. The most recent exceedance of a concentration limit was May 2007. The overall concentration of uranium in 300 Area Process Trenches wells remained above the 20 {micro}g/L concentration limit in the three downgradient wells screened at the water table. Fluctuations of uranium concentration are caused by changes in river stage. The concentration of cis-l ,2-dichloroethene remained above the 70 {micro}g/L concentration limit in one deep well (399-1-16B). Concentrations are relatively steady at this well and are not affected by river stage. Trichloroethene concentrations were below detection limits in all wells during the reporting period.

  6. Connecticut Rooftop Solar PV Permitting Guide

    Broader source: Energy.gov [DOE]

    The Connecticut Rooftop Solar PV Permitting Guide is a compilation of best practices and resources for solar PV permitting. The guide includes a summary of current codes and regulations affecting solar PV, best practices for streamlining the municipal permitting process, and tools to assist municipalities in creating a streamlined permit process for residential solar PV. Resources include a solar PV permit application, a structural review worksheet, an inspection checklist, and a model solar zoning ordinance.

  7. Basin analog approach answers characterization challenges of unconventional gas potential in frontier basins 

    E-Print Network [OSTI]

    Singh, Kalwant

    2007-04-25

    in exploratory basins. We developed software, Basin Analog System (BAS), to perform and accelerate the process of identifying analog basins. Also, we built a database that includes geologic and petroleum systems information of intensely studied North America...

  8. San Francisco's Streamlined Solar Permitting

    Broader source: Energy.gov [DOE]

    San Francisco’s solar permitting process—which allows permits for systems 4 kW and under to be applied for, approved, paid for, and issued online or in person over-the-counter—is one of the most efficient in the nation. This paper describes the process by which the City and County of San Francisco developed and implemented its streamlined solar permitting process, provides an update on San Francisco’s current e-permitting system, and outlines relevant lessons for other jurisdictions undertaking such work. This paper is structured as a resource for other jurisdictions to access best practices in streamlined permitting and learn from San Francisco’s experience.

  9. Flexibility Premium in Marketable Permits

    E-Print Network [OSTI]

    Macrina, Andrea

    for emission permits should attract those regulated companies with lower marginal costs for pollution abatement with lower marginal abatement costs to exploit the consequent price difference. 4 / 27 #12;Flexibility-emitting technology, modification of the production process, technology innovation); trading emission permits (spot

  10. Effect of Urbanization and Climate Change on Hydrological Processes over the San Antonio River Basin, Texas 

    E-Print Network [OSTI]

    Zhao, Gang

    2014-11-18

    flood peaks. Meanwhile, climate change has led to more frequent extreme events. Therefore, a thorough understanding of the hydrological processes under urbanization and climate change is indispensable for sustainable water management...

  11. Energy Permitting Wizard Helps Reduce Project Barriers in Hawai...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permitting Wizard Helps Reduce Project Barriers in Hawai'i Energy Permitting Wizard Helps Reduce Project Barriers in Hawai'i To address the complex permitting process for renewable...

  12. Geochemical tracers of processes affecting the formation of seafloor hydrothermal fluids and deposits in the Manus back-arc basin

    E-Print Network [OSTI]

    Craddock, Paul R

    2009-01-01

    Systematic differences in trace element compositions (rare earth element (REE), heavy metal, metalloid concentrations) of seafloor vent fluids and related deposits from hydrothermal systems in the Manus back-arc basin ...

  13. Processes Influencing the Diversity of Middle Permian Brachiopods in the Bell Canyon Formation of the Delaware Basin (West Texas, Guadalupe Mountains National Park) 

    E-Print Network [OSTI]

    Fall, Leigh Margaret

    2011-10-21

    INFLUENCING THE DIVERSITY OF MIDDLE PERMIAN BRACHIOPODS IN THE BELL CANYON FORMATION OF THE DELAWARE BASIN (WEST TEXAS, GUADALUPE MOUNTAINS NATIONAL PARK) A Dissertation by LEIGH MARGARET FALL Submitted to the Office of Graduate Studies... of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY August 2010 Major Subject: Geology PROCESSES INFLUENCING THE DIVERSITY OF MIDDLE PERMIAN BRACHIOPODS IN THE BELL CANYON FORMATION...

  14. California Solar Permitting Guidebook, Second Edition

    Broader source: Energy.gov [DOE]

    The California Solar Permitting Guidebook is a resource for local governments and permitting agencies to facilitate installation of small solar energy systems. By adopting its recommendations, local governments can reduce permit processing times and increase their output while facilitating local economic development.

  15. TECHNOLOGY DEVELOPMENT AND DEPLOYMENT OF SYSTEMS FOR THE RETRIEVAL AND PROCESSING OF REMOTE-HANDLED SLUDGE FROM HANFORD K-WEST FUEL STORAGE BASIN

    SciTech Connect (OSTI)

    RAYMOND RE

    2011-12-27

    In 2011, significant progress was made in developing and deploying technologies to remove, transport, and interim store remote-handled sludge from the 105-K West Fuel Storage Basin on the Hanford Site in south-central Washington State. The sludge in the 105-K West Basin is an accumulation of degraded spent nuclear fuel and other debris that collected during long-term underwater storage of the spent fuel. In 2010, an innovative, remotely operated retrieval system was used to successfully retrieve over 99.7% of the radioactive sludge from 10 submerged temporary storage containers in the K West Basin. In 2011, a full-scale prototype facility was completed for use in technology development, design qualification testing, and operator training on systems used to retrieve, transport, and store highly radioactive K Basin sludge. In this facility, three separate systems for characterizing, retrieving, pretreating, and processing remote-handled sludge were developed. Two of these systems were successfully deployed in 2011. One of these systems was used to pretreat knockout pot sludge as part of the 105-K West Basin cleanup. Knockout pot sludge contains pieces of degraded uranium fuel ranging in size from 600 {mu}m to 6350 {mu}m mixed with pieces of inert material, such as aluminum wire and graphite, in the same size range. The 2011 pretreatment campaign successfully removed most of the inert material from the sludge stream and significantly reduced the remaining volume of knockout pot product material. Removing the inert material significantly minimized the waste stream and reduced costs by reducing the number of transportation and storage containers. Removing the inert material also improved worker safety by reducing the number of remote-handled shipments. Also in 2011, technology development and final design were completed on the system to remove knockout pot material from the basin and transport the material to an onsite facility for interim storage. This system is scheduled for deployment in 2012. The prototype facility also was used to develop technology for systems to retrieve remote-handled transuranic sludge smaller than 6350 {mu}m being stored in underwater containers. After retrieving the sludge, the system will be used to load and transport the sludge for interim storage. During 2011, full-scale prototype systems were developed and tested to a Technology Readiness Level 6 as defined by U.S. Department of Energy standards. This system is scheduled for deployment in 2013. Operations also are scheduled for completion in 2014.

  16. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    SciTech Connect (OSTI)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  17. KALELE ROAD PARKING PERMIT ZONESPARKING PERMIT ZONES

    E-Print Network [OSTI]

    Greenhouses Institute for Astronomy University of Hawai`i Press Federal Credit Union Energy House & SafetyFREEWAY H1 KALELE ROAD PARKING PERMIT ZONESPARKING PERMIT ZONES 2010 - 20112010 - 2011 Parking Services Office · 2600 Campus Road, Room 014 · Honolulu, HI 96822 · www.hawaii.edu/parking · parking

  18. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the l...

  19. Solar PV Permitting and Safety Training Webinar

    Broader source: Energy.gov [DOE]

    This webinar provides training on two permitting resources for municipal inspectors; a prescriptive process for building inspectors and a guidance document for permitting for PV for electrical inspectors. The webinar also runs through a number of key code articles in Massachusetts 2014 electrical code and examines a variety of safety hazards commonly found during or after solar PV installations.

  20. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  1. Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program

    SciTech Connect (OSTI)

    Goldstein, D.R.; Cressman, A.W.

    1999-07-01

    Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

  2. The role of syn-kinematic sedimentation on early salt tectonic processes in the Post-Permian Salt Basin, Southern North Sea

    E-Print Network [OSTI]

    Royal Holloway, University of London

    history, subsequent Cretaceous-Cenozoic basin evolution, salt tectonic structures and petroleum systems & analogue modelling, geomechanics. #12;How to Apply: Please use the online application system (http

  3. Geohydrologic study of the Michigan Basin for the applicability of Jack W. McIntyre`s patented process for simultaneous gas recovery and water disposal in production wells

    SciTech Connect (OSTI)

    Maryn, S.

    1994-03-01

    Geraghty & Miller, Inc. of Midland, Texas conducted a geohydrologic study of the Michigan Basin to evaluate the applicability of Jack McIntyre`s patented process for gas recovery and water disposal in production wells. A review of available publications was conducted to identify, (1) natural gas reservoirs which generate large quantities of gas and water, and (2) underground injection zones for produced water. Research efforts were focused on unconventional natural gas formations. The Antrim Shale is a Devonian gas shale which produces gas and large quantities of water. Total 1992 production from 2,626 wells was 74,209,916 Mcf of gas and 25,795,334 bbl of water. The Middle Devonian Dundee Limestone is a major injection zone for produced water. ``Waterless completion`` wells have been completed in the Antrim Shale for gas recovery and in the Dundee Limestone for water disposal. Jack McIntyre`s patented process has potential application for the recovery of gas from the Antrim Shale and simultaneous injection of produced water into the Dundee Limestone.

  4. RCRA post-closure permits

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits (including treatment, storage, and disposal permits; research, development, and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits) are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  5. General Air Permits (Louisiana)

    Broader source: Energy.gov [DOE]

    Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any...

  6. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Municipalities and counties in Arizona may no longer require a stamp from a professional engineer to approve a solar system installation, which can raise the cost of a permit, unless such a...

  7. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  8. Hanford Facility RCRA permit handbook

    SciTech Connect (OSTI)

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  9. City of Portland- Streamlined Building Permits for Residential Solar Systems

    Broader source: Energy.gov [DOE]

    The City of Portland's Bureau of Development Services (BDS) developed a streamlined permitting process for residential solar energy system installations. The City of Portland has staff at the...

  10. Coordination of Federal Transmission Permitting on Federal Lands...

    Energy Savers [EERE]

    federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity,...

  11. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  12. COMPARISON OF FINAL TREATMENT & PROCESS METHODS FOR THE PREPARATION & INTERIM STORAGE OF K BASIN KNOCKOUT POT SLUDGE ENGINEERING STUDY

    SciTech Connect (OSTI)

    ERPENBECK, E.G.

    2004-06-22

    Fluor Hanford (FH) directed British Nuclear Fuels, Inc. (BNFL) to prepare a Knock Out Pot (KOP) study ''using cold vacuum drying (CVD) to dry the KOP sludge with a final disposition to Canister Storage Building (CSB) or evaluate a process to corrode the sludge in water and grout it to meet the end state criteria for the Waste Isolation Pilot Plant (WIPP).'' BNFL initially identified four process options: (1) Incorporate sludges into grout with no pre-conditioning; (2) Corrode the Uranium metal in the sludges then incorporate the resulting sludge into grout; (3) Separate sludge into two streams by washing/size separation with: Larger particle/Uranium metal rich stream being vacuum dried at CVD; and Smaller particle/lower Uranium metal stream being incorporated into grout; and (4) Cold vacuum dry all sludge at CVD. A coarse down selection meeting discounted option 1 as the number of drums required was prohibitive in terms of cost and schedule; and option 4 due to the technical inability of CVD to dry this waste.

  13. Modeling thermal convection in supradetachment basins: example from western Norway

    E-Print Network [OSTI]

    Andersen, Torgeir Bjørge

    Modeling thermal convection in supradetachment basins: example from western Norway A. SOUCHE*, M. DABROWSKI AND T. B. ANDERSEN Physics of Geological Processes (PGP), University of Oslo, Oslo, Norway basins of western Norway are examples of supradetachment basins that formed in the hanging wall

  14. Permit application modifications

    SciTech Connect (OSTI)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  15. Basin analysis in the Illinois basin

    SciTech Connect (OSTI)

    Leighton, M.W. (Illinois State Geological Survey, Champaign (USA)); Haney, D. (Kentucky Geological Survey, Lexington (USA)); Hester, N. (Indiana Geological Survey, Bloomington (USA))

    1990-05-01

    In April 1989, the Illinois State Geological Survey and the Indiana and Kentucky Geological surveys formed the Illinois Basin Consortium (IBC) for the purpose of advancing the geologic understanding of the Illinois basin and of developing basin-wide studies for the assessment and wise development of the Illinois basin energy, mineral, and water resources. Cooperative efforts include work on the AAPG Interior Cratonic Sag Basin volume, Springfield coal study, Paducah CUSMAP study in cooperation with the US Geological Survey, Illinois Basin Cross Section Project, Geologic Society of America Coal Division field trip and workshop on Lower Pennsylvanian geology, workshops in basin analysis, and the Tri-State Committee on correlations in the Pennsylvanian System of the Illinois Basin. A network of 16 regional surface to basement cross sections portraying the structural and stratigraphic framework of the total sedimentary section of the entire basin is in preparation. Based on more than 140 of the deepest wells with wireline logs, the sections will show formation boundaries and gross lithofacies of the entire stratigraphic column. A set of basin-wide maps shows structure, thickness, and coal quality of the economically important Springfield coal seam. These maps were generated from recently joined computerized databases of the three member surveys of IBC. A unified stratigraphic nomenclature of the Pennsylvanian System is being developed, including seven new members and seven new formation names. The goal is to simplify, standardize, and gradually improve the stratigraphic terminology to be used in the Illinois basin.

  16. An Archaeological Survey of the Proposed Regional Basin Number 8 in Central Angelina County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-12

    Brazos Valley Research Associates (BVRA) performed a cultural resources survey of a 38 acre proposed regional basin in central Angelina County, Texas in May 2000. This project was conducted under Texas Antiquities Committee permit number 2392...

  17. September 2012 BASIN RESEARCH AND ENERGY GEOLOGY

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    September 2012 BASIN RESEARCH AND ENERGY GEOLOGY STATE UNIVERSITY OF NEW YORK at BINGHAMTON research programs in geochemistry, sedimentary geology, or Earth surface processes with the potential the position, visit the Geological Sciences and Environmental Studies website (www.geology

  18. Montana Water Quality Permit Application, Nondegradation Authorization...

    Open Energy Info (EERE)

    Montana Water Quality Permit Application, Nondegradation Authorization, and Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  19. Washington Environmental Permit Handbook - NPDES Construction...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - NPDES Construction Stormwater General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  20. Basin Destination State

    Gasoline and Diesel Fuel Update (EIA)

    Basin Michigan 0.0192 0.0202 W 0.0188 W W W W 0.0246 3.1 W Northern Appalachian Basin New Hampshire W W W W W W W W W W W Northern Appalachian Basin New Jersey W W W W W W W W...

  1. Basin Destination State

    Gasoline and Diesel Fuel Update (EIA)

    Basin Michigan 0.0174 0.0186 W 0.0182 W W W W 0.0269 5.6 W Northern Appalachian Basin New Hampshire W W W W W W W W W W W Northern Appalachian Basin New Jersey W W W W W W W W...

  2. Water Basins Civil Engineering

    E-Print Network [OSTI]

    Provancher, William

    Water Basins Civil Engineering Objective · Connect the study of water, water cycle, and ecosystems with engineering · Discuss how human impacts can effect our water basins, and how engineers lessen these impacts: · The basic concepts of water basins are why they are important · To use a topographic map · To delineate

  3. Regulatory and Permitting Issues

    SciTech Connect (OSTI)

    Larry Myer

    2005-12-01

    As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

  4. Basin-Scale Hydrologic Impacts of CO2 Storage: Regulatory and Capacity Implications

    SciTech Connect (OSTI)

    Birkholzer, J.T.; Zhou, Q.

    2009-04-02

    Industrial-scale injection of CO{sub 2} into saline sedimentary basins will cause large-scale fluid pressurization and migration of native brines, which may affect valuable groundwater resources overlying the deep sequestration reservoirs. In this paper, we discuss how such basin-scale hydrologic impacts can (1) affect regulation of CO{sub 2} storage projects and (2) may reduce current storage capacity estimates. Our assessment arises from a hypothetical future carbon sequestration scenario in the Illinois Basin, which involves twenty individual CO{sub 2} storage projects in a core injection area suitable for long-term storage. Each project is assumed to inject five million tonnes of CO{sub 2} per year for 50 years. A regional-scale three-dimensional simulation model was developed for the Illinois Basin that captures both the local-scale CO{sub 2}-brine flow processes and the large-scale groundwater flow patterns in response to CO{sub 2} storage. The far-field pressure buildup predicted for this selected sequestration scenario suggests that (1) the area that needs to be characterized in a permitting process may comprise a very large region within the basin if reservoir pressurization is considered, and (2) permits cannot be granted on a single-site basis alone because the near- and far-field hydrologic response may be affected by interference between individual sites. Our results also support recent studies in that environmental concerns related to near-field and far-field pressure buildup may be a limiting factor on CO{sub 2} storage capacity. In other words, estimates of storage capacity, if solely based on the effective pore volume available for safe trapping of CO{sub 2}, may have to be revised based on assessments of pressure perturbations and their potential impact on caprock integrity and groundwater resources, respectively. We finally discuss some of the challenges in making reliable predictions of large-scale hydrologic impacts related to CO{sub 2} sequestration projects.

  5. Area temporarily closed for construction General Permit

    E-Print Network [OSTI]

    48 97 28 28 61 36 31 22 LOT L General Permit Parking LOT A General Permit Parking LOT C General Permit Parking LOT R Reserved Parking LOT D Faculty/Staff Parking LOT K General Permit Parking LOT J General Permit Parking Reserved Parking PV LOT General Parking after 3 p.m. LOT O General Permit Parking

  6. Solar Permit Application and Checklist

    Broader source: Energy.gov [DOE]

    This Photovoltaic System Application and Checklist may be used by any jurisdiction in the Kansas City area as a standardized document to be used by those seeking a solar system permit for residential or commercial photovoltaic systems under 15kW. The Application and Checklist clarifies the permitting steps for small solar systems and details the information and documentation that is required in the permit application.

  7. The Individual Permit for Stormwater

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Stormwater Eliminate contaminated stormwater discharges from specified Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) Use control measures called "best...

  8. MHWMF Part I Permit Modifications

    National Nuclear Security Administration (NNSA)

    stored on site under generator storage requirements until their disposal at off-site Resource Conservation and Recovery Act-permitted facilities or are treated at the KCP's...

  9. FISHING PERMIT Eastern Shore Agricultural

    E-Print Network [OSTI]

    FISHING PERMIT Eastern Shore Agricultural Research and Extension Center If all fields are not filled out, you do NOT have permission to fish! Name: ____________________________________________ Fishing Permit is valid for ONE YEAR. In return for this privilege, I agree to: 1. ABSOLVE the Eastern

  10. Equivalent hydraulic conductivity of an experimental stratigraphy: Implications for basin-scale flow

    E-Print Network [OSTI]

    Gable, Carl W.

    Equivalent hydraulic conductivity of an experimental stratigraphy: Implications for basin by scaling up an experimental stratigraphy created by physical sedimentation processes and by assuming. Person (2006), Equivalent hydraulic conductivity of an experimental stratigraphy: Implications for basin

  11. River Basin Commissions (Indiana)

    Broader source: Energy.gov [DOE]

    This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

  12. The role of active and ancient geothermal processes in the generation, migration, and entrapment of oil in the basin and Range Province, western USA. Final technical report

    SciTech Connect (OSTI)

    Hulen, J.B.; Collister, J.W.; Curtiss, D.K. [and others

    1997-06-01

    The Basin and Range (B&R) physiographic province of the western USA is famous not only for its geothermal and precious-metal wealth, but also for its thirteen oil fields, small but in some cases highly productive. The Grant Canyon field in Railroad Valley, for example, for years boasted production of more than 6000 barrels of oil (BO) per day from just two wells; aggregate current production from the Blackburn field in Pine Valley commonly exceeds 1000 BO per day. These two and several other Nevada oil fields are unusually hot at reservoir depth--up to 130{degrees}C at depths as shallow as 1.1 km, up to three times the value expected from the prevailing regional geothermal gradient.

  13. Playa basin development, southern High Plains, Texas and New Mexico

    SciTech Connect (OSTI)

    Gustavson, T.C. (Univ. of Texas, Austin, TX (United States)); Holliday, V.T. (Univ. of Wisconsin, Madison, WI (United States))

    1992-01-01

    More than 20,000 playa basins have formed on fine-grained eolian sediments of the Quaternary Blackwater Draw and Tertiary Ogallala Formations on the High Plains of TX and NM. Numerous hypotheses have been proposed for the development of playa basins: (1) subsidence due to dissolution of underlying Permian bedded salt, (2) dissolution of soil carbonate and piping of clastic sediment into the subsurface, (3) animal activity, and (4) deflation. Evidence of eolian processes includes lee dunes and straightened shorelines on the eastern and southern margins of many playas. Lee dunes, which occur on the eastern side of ca 15% of playa basins and contain sediment deflated from adjacent playas, are cresentic to oval in plain view and typically account for 15--40% of the volume of the playa basin. Quaternary fossil biotas and buried calcic soils indicate that grasslands and semi-arid to aid climatic conditions prevailed as these basins formed. Evidence of fluviolacustrine processes in playa basins includes centripetal drainage leading to fan deltas at playa margins and preserved deltaic and lacustrine sediments. Playa basins expanded as fluvial processes eroded basin slopes and carried sediment to the basin floor where, during periods of minimal vegetation cover, loose sediment was removed by deflation. Other processes that played secondary roles in the development of certain playa basins include subsidence induced by dissolution of deeply buried Permian salt, dissolution of soil carbonate and piping, and animal activity. Two small lake basins in Gray County, TX, occur above strata affected by dissolution-induced subsidence. Dissolution of soil carbonate was observed in exposures and cores of strata underlying playa basins. Cattle, and in the past vast numbers of migrating buffalo, destroy soil crusts in dry playas, making these sediments more susceptible to deflation, and carry sediment out of flooded playas on their hooves.

  14. Wind Access and Permitting Law

    Broader source: Energy.gov [DOE]

    The law also defines a limited set of reasonable restrictions that governments and associations are permitted to use in regulating residential wind energy systems. Any limitations put in place may...

  15. Solar Permitting & Inspection Webinar Series

    Office of Energy Efficiency and Renewable Energy (EERE)

    ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

  16. Class 1 Permit Modification Notification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being submitted by the U.S. Department of Energy (DOE) and Washington TRU Solutions LLC (WTS), collectively referred to as the Permittees, in accordance with Permit Part 1.3.1...

  17. Washington Environmental Permit Handbook - Dangerous Waste Treatment...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Dangerous Waste Treatment Storage Disposal Facility New Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Web...

  18. Permit Types, Tiers, and Parking Privileges 2014-2015 Permit Type/Neighborhood Permit Tier Parking Privileges

    E-Print Network [OSTI]

    Chen, Tsuhan

    Privileges A (North Campus A Lot) Outer A lot on North Campus AP (Accessible Campus-wide Parking) ValidPermit Types, Tiers, and Parking Privileges 2014-2015 Permit Type/Neighborhood Permit Tier Parking in all permit-restricted parking spaces except reserved. Not valid in MT spaces. Must comply with posted

  19. GEOCHEMICAL MODELING OF F AREA SEEPAGE BASIN COMPOSITION AND VARIABILITY

    SciTech Connect (OSTI)

    Millings, M.; Denham, M.; Looney, B.

    2012-05-08

    From the 1950s through 1989, the F Area Seepage Basins at the Savannah River Site (SRS) received low level radioactive wastes resulting from processing nuclear materials. Discharges of process wastes to the F Area Seepage Basins followed by subsequent mixing processes within the basins and eventual infiltration into the subsurface resulted in contamination of the underlying vadose zone and downgradient groundwater. For simulating contaminant behavior and subsurface transport, a quantitative understanding of the interrelated discharge-mixing-infiltration system along with the resulting chemistry of fluids entering the subsurface is needed. An example of this need emerged as the F Area Seepage Basins was selected as a key case study demonstration site for the Advanced Simulation Capability for Environmental Management (ASCEM) Program. This modeling evaluation explored the importance of the wide variability in bulk wastewater chemistry as it propagated through the basins. The results are intended to generally improve and refine the conceptualization of infiltration of chemical wastes from seepage basins receiving variable waste streams and to specifically support the ASCEM case study model for the F Area Seepage Basins. Specific goals of this work included: (1) develop a technically-based 'charge-balanced' nominal source term chemistry for water infiltrating into the subsurface during basin operations, (2) estimate the nature of short term and long term variability in infiltrating water to support scenario development for uncertainty quantification (i.e., UQ analysis), (3) identify key geochemical factors that control overall basin water chemistry and the projected variability/stability, and (4) link wastewater chemistry to the subsurface based on monitoring well data. Results from this study provide data and understanding that can be used in further modeling efforts of the F Area groundwater plume. As identified in this study, key geochemical factors affecting basin chemistry and variability included: (1) the nature or chemistry of the waste streams, (2) the open system of the basins, and (3) duration of discharge of the waste stream types. Mixing models of the archetype waste streams indicated that the overall basin system would likely remain acidic much of the time. Only an extended periods of predominantly alkaline waste discharge (e.g., >70% alkaline waste) would dramatically alter the average pH of wastewater entering the basins. Short term and long term variability were evaluated by performing multiple stepwise modeling runs to calculate the oscillation of bulk chemistry in the basins in response to short term variations in waste stream chemistry. Short term (1/2 month and 1 month) oscillations in the waste stream types only affected the chemistry in Basin 1; little variation was observed in Basin 2 and 3. As the largest basin, Basin 3 is considered the primary source to the groundwater. Modeling showed that the fluctuation in chemistry of the waste streams is not directly representative of the source term to the groundwater (i.e. Basin 3). The sequence of receiving basins and the large volume of water in Basin 3 'smooth' or nullify the short term variability in waste stream composition. As part of this study, a technically-based 'charge-balanced' nominal source term chemistry was developed for Basin 3 for a narrow range of pH (2.7 to 3.4). An example is also provided of how these data could be used to quantify uncertainty over the long term variations in waste stream chemistry and hence, Basin 3 chemistry.

  20. PERMITTING LEADERSHIP IN THE UNITED STATES

    SciTech Connect (OSTI)

    Ken Nemeth

    2002-09-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical assistance to evaluate DOE's cleanup plans. In addition, the PLUS program has facilitated the involvement of key regulators from host-states beyond the Southern region.

  1. K Basin Hazard Analysis

    SciTech Connect (OSTI)

    PECH, S.H.

    2000-08-23

    This report describes the methodology used in conducting the K Basins Hazard Analysis, which provides the foundation for the K Basins Final Safety Analysis Report. This hazard analysis was performed in accordance with guidance provided by DOE-STD-3009-94, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports and implements the requirements of DOE Order 5480.23, Nuclear Safety Analysis Report.

  2. Summary status of K Basins sludge characterization

    SciTech Connect (OSTI)

    Baker, R.B.

    1995-01-20

    A number of activities are underway as part of the Spent Nuclear Fuels Project (SNFP) related to the processing and disposing of sludge in the 105-K Basins (K Basins). Efforts to rigorously define data requirements for these activities are being made using the Data Quality Objectives (DQO) process. Summaries of current sludge characterization data are required to both help support this DQO process and to allow continued progress with on-going engineering activities (e.g., evaluations of disposal alternatives). This document provides the status of K Basins sludge characterization data currently available to the Nuclear Fuel Evaluations group. This group is tasked by the SNFP to help develop and maintain the characterization baseline for the K Basins. The specific objectives of this document are to: (1) provide a current summary (and set of references) of sludge characterization data for use by SNFP initiatives, to avoid unnecessary duplication of effort and to support on-going initiatives; (2) submit these data to an open forum for review and comment, and identify additional sources of significant data that may be available; (3) provide a summary of current data to use as part of the basis to develop requirements for additional sludge characterization data through the DQO process; (4) provide an overview of the intended activities that will be used to develop and maintain the sludge characterization baseline.

  3. Role of regional extension and uplift in the Plio-Pleistocene evolution of the Aksu Basin, SW Turkey 

    E-Print Network [OSTI]

    Glover, Clare P; Robertson, Alastair H F

    1998-01-01

    The Aksu Basin, within the Isparta Angle area of SW Turkey, documents Plio-Pleistocene crustal processes at the interface between the Tauride Mountains and the Eastern Mediterranean Sea. Basin sedimentation began in the Late Miocene, following...

  4. Lunar impact basins: Stratigraphy, sequence and ages from superposed impact crater populations measured from Lunar Orbiter Laser Altimeter (LOLA) data

    E-Print Network [OSTI]

    Fassett, Caleb I.

    Impact basin formation is a fundamental process in the evolution of the Moon and records the history of impactors in the early solar system. In order to assess the stratigraphy, sequence, and ages of impact basins and the ...

  5. Analysis of Ignition Testing on K-West Basin Fuel

    SciTech Connect (OSTI)

    J. Abrefah; F.H. Huang; W.M. Gerry; W.J. Gray; S.C. Marschman; T.A. Thornton

    1999-08-10

    Approximately 2100 metric tons of spent nuclear fuel (SNF) discharged from the N-Reactor have been stored underwater at the K-Basins in the 100 Area of the Hanford Site. The spent fuel has been stored in the K-East Basin since 1975 and in the K-West Basin since 1981. Some of the SNF elements in these basins have corroded because of various breaches in the Zircaloy cladding that occurred during fuel discharge operations and/or subsequent handling and storage in the basins. Consequently, radioactive material in the fuel has been released into the basin water, and water has leaked from the K-East Basin into the soil below. To protect the Columbia River, which is only 380 m from the basins, the SNF is scheduled to be removed and transported for interim dry storage in the 200 East Area, in the central portion of the Site. However, before being shipped, the corroded fuel elements will be loaded into Multi-Canister OverPacks and conditioned. The conditioning process will be selected based on the Integrated Process Strategy (IPS) (WHC 1995), which was prepared on the basis of the dry storage concept developed by the Independent Technical Assessment (ITA) team (ITA 1994).

  6. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program, under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements into a single,...

  7. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/OPerformance and Debugging ToolsEdison Performance

  8. US Army Corps of Engineers Section 404: permitting of valley fills - red flag or red tape?

    SciTech Connect (OSTI)

    Thomas R. Johnston, Jr. [Skelly & Loy (United States)

    2009-03-15

    Since 2001 the US Army Corps of Engineers has been permitting most surface coal mines as Individual Permits rather than Nationwide Permits under the Section 404 program. This was shown in a survey by Skelly & Loy of permits published by Huntingdon Crops District and the state of Kentucky. Nationwide Permit 21 (NWP21) authorises the filling of waters of the United States associated with surface coal mining and reclamation operations already authorised or currently being processed as part of the integrated permit processing procedure. NWP21 has received much opposition and two noticeable court cases involving it, in West Virginia and Kentucy, are briefly reported. The article first appeared in Skelly & Loy's newsletter, Portal to the mining industry, Vol II, Issue 1. 4 photos.

  9. Facing Title V permit constraints

    SciTech Connect (OSTI)

    Patankar, U.M. [JACA Corp., Fort Washington, PA (United States)

    1995-06-01

    The new Title V operating permit requirement under state regulations pursuant to the 1990 Clean Air Act Amendments will cover every emission source at a facility. These rules will significantly affect an operation by setting minimum compliance requirements, mandating periodic compliance certification, prescribing complex monitoring, record keeping and reporting procedures and making state and EPA approval of routine operational changes necessary through a permit amendment. The main concern with Title V is its effect on the operational flexibility of a facility, and individual emission sources within that facility. Unless properly addressed in a permit document, the term operational flexibility, so freely used by regulators in the context of the Title V program, can turn into a misnomer and the ability to operate as before may be significantly compromised under Title V. True operational flexibility is essential for businesses to respond to real changes in the marketplace. In the age of automation, just-in-time inventories and increased competition, flexibility to operate can mean the difference between growth and stagnation.

  10. Construction Permits and Fees (New Mexico)

    Broader source: Energy.gov [DOE]

    Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

  11. Market Power in Pollution Permit Markets

    E-Print Network [OSTI]

    Montero, Juan Pablo

    As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

  12. Air Permitting for Stationary Sources (New Hampshire)

    Broader source: Energy.gov [DOE]

    The permitting system implements the permitting requirements of RSA 125-C and 125-I to regulate the operation and modification of new and existing stationary sources, area sources, and devices to...

  13. 300 area TEDF permit compliance monitoring plan

    SciTech Connect (OSTI)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  14. System Description for the KW Basin Integrated Water Treatment System (IWTS) (70.3)

    SciTech Connect (OSTI)

    DERUSSEAU, R.R.

    2000-04-18

    This is a description of the system that collects and processes the sludge and radioactive ions released by the spent nuclear fuel (SNF) processing operations conducted in the 105 KW Basin. The system screens, settles, filters, and conditions the basin water for reuse. Sludge and most radioactive ions are removed before the water is distributed back to the basin pool. This system is part of the Spent Nuclear Fuel Project (SNFP).

  15. Solar Photovoltaic (PV) System Permit Application Checklist

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Permit Application Checklist is intended to be used as a best management practice when establishing local government requirements for residential and commercial solar photovoltaic (PV) system permits. Local governments may modify this checklist to accommodate their local ordinances, code requirements, and permit procedures.

  16. Federal Environmental Permitting Handbook. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1991-05-01

    The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

  17. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  18. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  19. SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

    SciTech Connect (OSTI)

    Langton, C.; Blankenship, J.; Griffin, W.; Serrato, M.

    2009-12-03

    The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

  20. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    SciTech Connect (OSTI)

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  1. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  2. Summary - K Basins Sludge Treatment Process

    Office of Environmental Management (EM)

    and representative monstration of veloped. esults of the ass itical Technolo w, several tech atively high ma r (and the team an that focuses rther maturity. maturity of certain...

  3. Permit Fees for Hazardous Waste Material Management (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

  4. State waste discharge permit application, 200-E chemical drain field

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  5. Rappahannock River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rappahannock River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the...

  6. Susquehanna River Basin Compact (Maryland)

    Broader source: Energy.gov [DOE]

    This legislation enables the state's entrance into the Susquehanna River Basin Compact, which provides for the conservation, development, and administration of the water resources of the...

  7. Geothermal energy development in Washington State. A guide to the federal, state and local regulatory process

    SciTech Connect (OSTI)

    Bloomquist, R.G.; Simpson, S.J.

    1986-03-01

    Washington State's geothermal potential is wide spread. Hot springs and five strato volcanoes existing throughout the Cascade Range, limited hot spring activity on the Olympic Peninsula, and broad reaching, low temperature geothermal resources found in the Columbia Basin comprise the extent of Washington's known geothermal resources. Determination of resource ownership is the first step in proceeding with geothermal exploration and development activities. The federal and state processes are examined from pre-lease activity through leasing and post-lease development concerns. Plans, permits, licenses, and other requirements are addressed for the federal, state, and local level. Lease, permit, and other forms for a number of geothermal exploration and development activities are included. A map of public lands and another displaying the measured geothermal resources throughout the state are provided.

  8. Wastewater Construction and Operation Permits (Iowa)

    Broader source: Energy.gov [DOE]

    These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

  9. Oregon Water Quality Permit Program (Stormwater - Industrial...

    Open Energy Info (EERE)

    Oregon Water Quality Permit Program (Stormwater - Industrial Activities) Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Water Quality...

  10. Presidential Permits and Export Authorizations - Frequently Asked...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    they? Permits for the construction, connection, operation andor maintenance of electric transmission lines that cross the U.S. international border. What are the criteria? Two...

  11. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  12. Disclosure of Permitted Communication Concerning Regional Standards...

    Broader source: Energy.gov (indexed) [DOE]

    furnacestdwaiverpolicy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major...

  13. Air Permits, Licenses, Certifications (Maine) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program....

  14. Colorado Air Pollution Control Division - Construction Permits...

    Open Energy Info (EERE)

    Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs) Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  15. Washington Environmental Permit Handbook - Underground Injection...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Underground Injection Control Registration webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site:...

  16. Los Alamos National Laboratory Environmental Permits Update

    Broader source: Energy.gov [DOE]

    At the January 29, 2014 Board meeting Tony Grieggs LANL, Provided Information on the Environmental Permit Status and the LANL Sites that they Cover.

  17. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect (OSTI)

    Facca, G.; Faler, M.

    1998-12-31

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  18. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    SciTech Connect (OSTI)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  19. Basin-Scale Opportunity Assessment Initiative Background Literature Review

    SciTech Connect (OSTI)

    Saulsbury, Bo; Geerlofs, Simon H.; Cada, Glenn F; Bevelhimer, Mark S

    2010-10-01

    As called for in the March 24, 2010, Memorandum of Understanding (MOU) for Hydropower, the U.S. Department of Energy (DOE), the U.S. Department of the Interior (DOI), the U.S. Army Corps of Engineers (USACE), environmental stakeholders, and the hydropower industry are collaborating to identify opportunities to simultaneously increase electricity generation and improve environmental services in river basins of the United States. New analytical tools provide an improved ability to understand, model, and visualize environmental and hydropower systems. Efficiencies and opportunities that might not be apparent in site-by-site analyses can be revealed through assessments at the river-basin scale. Information from basin-scale assessments could lead to better coordination of existing hydropower projects, or to inform siting decisions (e.g., balancing the removal of some dams with the construction of others), in order to meet renewable energy production and environmental goals. Basin-scale opportunity assessments would inform energy and environmental planning and address the cumulative effects of hydropower development and operations on river basin environmental quality in a way that quantifies energy-environment tradeoffs. Opportunity assessments would create information products, develop scenarios, and identify specific actions that agencies, developers, and stakeholders can take to locate new sustainable hydropower projects, increase the efficiency and environmental performance of existing projects, and restore and protect environmental quality in our nation's river basins. Government agencies and non-governmental organizations (NGO) have done significant work to understand and assess opportunities for both hydropower and environmental protection at the basin scale. Some initiatives have been successful, others less so, and there is a need to better understand the legacy of work on which this current project can build. This background literature review is intended to promote that understanding. The literature review begins with a discussion in Section 2.0 of the Federal regulatory processes and mission areas pertaining to hydropower siting and licensing at the basin scale. This discussion of regulatory processes and mission areas sets the context for the next topic in Section 3.0, past and ongoing basin-scale hydropower planning and assessment activities. The final sections of the literature review provide some conclusions about past and ongoing basin-scale activities and their relevance to the current basin-scale opportunity assessment (Section 4.0), and a bibliography of existing planning and assessment documents (Section 5.0).

  20. CAMP PARKING PERMIT VALID LOT G ONLY

    E-Print Network [OSTI]

    Burg, Theresa

    PERMIT No. SUMMER CAMP PARKING PERMIT VALID LOT G ONLY (REFER TO SIGNS IN PARKING LOT TO ENSURE RD. Aperture Lake LOT F LOT FS LOT J LOT N LOT C University Day Care The Quad Summer Camp Parking Lot PROPER USE) VALID FROM: JUNE 29, 2015 TO: AUG 28, 2015 VALID ONLY DURING TIMES BELOW PARKING ANYWHERE

  1. Advanced Chemistry Basins Model

    SciTech Connect (OSTI)

    Blanco, Mario; Cathles, Lawrence; Manhardt, Paul; Meulbroek, Peter; Tang, Yongchun

    2003-02-13

    The objective of this project is to: (1) Develop a database of additional and better maturity indicators for paleo-heat flow calibration; (2) Develop maturation models capable of predicting the chemical composition of hydrocarbons produced by a specific kerogen as a function of maturity, heating rate, etc.; assemble a compositional kinetic database of representative kerogens; (3) Develop a 4 phase equation of state-flash model that can define the physical properties (viscosity, density, etc.) of the products of kerogen maturation, and phase transitions that occur along secondary migration pathways; (4) Build a conventional basin model and incorporate new maturity indicators and data bases in a user-friendly way; (5) Develop an algorithm which combines the volume change and viscosities of the compositional maturation model to predict the chemistry of the hydrocarbons that will be expelled from the kerogen to the secondary migration pathways; (6) Develop an algorithm that predicts the flow of hydrocarbons along secondary migration pathways, accounts for mixing of miscible hydrocarbon components along the pathway, and calculates the phase fractionation that will occur as the hydrocarbons move upward down the geothermal and fluid pressure gradients in the basin; and (7) Integrate the above components into a functional model implemented on a PC or low cost workstation.

  2. Modelling complex flood flow evolution in the middle Yellow River basin, China

    E-Print Network [OSTI]

    Yu, Qian

    Modelling complex flood flow evolution in the middle Yellow River basin, China Hongming He a January 2008 KEYWORDS Flood routing; Backwater flow; The middle Yellow River; River morphology Summary Flood routing processes in the middle Yellow River basin are complex since they consist of three types

  3. Non-native grasses alter evapotranspiration and energy balance in Great Basin sagebrush communities

    E-Print Network [OSTI]

    DeLucia, Evan H.

    Non-native grasses alter evapotranspiration and energy balance in Great Basin sagebrush communities key ecosystem processes in the Great Basin, including hydrology and energy balance. To determine how) and energy fluxes using the Bowen ratio-energy balance method with measurements of normalized difference

  4. Repository site definition in basalt: Pasco Basin, Washington

    SciTech Connect (OSTI)

    Guzowski, R.V.; Nimick, F.B.; Muller, A.B.

    1982-03-01

    Discussion of the regional setting, geology, hydrology, and geochemistry of the Pasco Basin are included in this report. Pasco basin is a structural and topographic basin of approximately 2000 mi/sup 2/ (5180 km/sup 2/) located within the Yakima Fold Belt Subprovince of the Columbia Plateau. The stratigraphic sequence within the basin consists of an undetermined thickness of lower Miocene and younger flood basalts with interbedded and overlying sedimentary units. This sequence rests upon a basement of probably diverse rock types that may range in age from precambrian through early Tertiary. Although a large amount of information is available on the hydrology of the unconfined aquifer system, ground-water flow within the basin is, in general, poorly understood. Recharge areas for the Mabton interbed and the Saddle Mountains Formation are the highlands surrounding the basin with the flow for these units toward Gable Butte - Gable Mountain and Lake Wallula. Gable Butte - Gable Mountain probably is a ground-water sink, although the vertical flow direction in this zone is uncertain. The amount of upward vertical leakage from the Saddle Mountains Formation into the overlying sediments or to the Columbia River is unknown. Units underlying the Mabton interbed may have a flow scheme similar to those higher units or a flow scheme dominated by interbasin flow. Upward vertical leakage either throughout the basin, dominantly to the Columbia River, or dominantly to Lake Wallula has been proposed for the discharge of the lower units. None of these proposals is verified. The lateral and vertical distribution of major and minor ions in solution, Eh and pH, and ion exchange between basalt and ground-water are not well defined for the basin. Changes in the redox potential from the level of the subsurface facility to the higher stratigraphic levels along with the numerous other factors influencing K/sub d/, result in a poor understanding of the retardation process.

  5. RCRA post-closure permits. RCRA Information Brief

    SciTech Connect (OSTI)

    Coalgate, J.

    1993-02-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits, including treatment,storage, and disposal permits; research, development and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  6. May 4, 2015 Summer parking permits are now available.

    E-Print Network [OSTI]

    Fairfax Resident Lite permit: $110 *Fairfax Lot M/P: $60 Mason Pond & Shenandoah reserved parking deckContent May 4, 2015 Summer parking permits are now available. Arlington General permit permit: $185 *Rappahannock River reserved parking deck/garage permit: $145 Founders Hall reserved parking

  7. Evolution of Extensional Basins and Basin and Range Topography...

    Open Energy Info (EERE)

    movements on an array of strike-slip and normal fault systems have resulted in the uplift and preservation of older basins in modern ranges. One of the best exposed of these is...

  8. Wastewater Land Application Permit LA-000141 Renewal Information for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    none,

    1999-02-01

    On July 25, 1994, the State of ldaho Division of Environmental Quality issued a Wastewater Land Application Permit, #LA-000141-01, for the Central Facilities Area Sewage Treatment Plant. The permit expires August 7, 1999. This report is being submitted with the renewal application and specifically addresses; Wastewater flow; Wastewater characteristics; Impacts to vegetation in irrigation area; Impacts to soil in irrigation area; Evaluation of groundwater monitoring wells for Wastewater Land Application Permit purposes; Summary of trends observed during the 5-year reporting period; and Projection of changes and new processes.

  9. Disclosure of Permitted Communication Concerning Fossil Fuel...

    Energy Savers [EERE]

    Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Disclosure of Permitted...

  10. City of Asheville- Building Permit Fee Waiver

    Broader source: Energy.gov [DOE]

    The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  11. Free energy basin-hopping

    E-Print Network [OSTI]

    Sutherland-Cash, K.H.; Wales, D.J.; Chakrabarti, D.

    2015-02-17

    A global optimisation scheme is presented using basin-hopping with the acceptance criterion based on approximate free energy for the corresponding local minima of the potential energy. The method is illustrated for atomic and colloidal clusters...

  12. Rivanna River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

  13. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect (OSTI)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  14. Oregon Stormwater Permit Application Forms and Permit Fees Website | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio Program | Open EnergyInformationSiting Process JumpEnergy

  15. C.R.S. 37-90-137 - Permits to Construct Wells Outside Designated Basins |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine:Kansas: Energy Resources Jump to:Energy Inc - WaterInformation

  16. Building Full Cost Accounting Resource Decisions for the Fraser Basin

    E-Print Network [OSTI]

    #12;Building Full Cost Accounting into Resource Decisions for the Fraser Basin Prepared by: Tim Mc for this study. I #12;Executive Summary ! T& report is concerned with the potential use of full cost accounting accounting (FCA) is an analytical process that involves systematic comparison of all broadly defined costs

  17. Abatement of Air Pollution: Permit to Construct and Operate Stationary...

    Broader source: Energy.gov (indexed) [DOE]

    Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements,...

  18. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission:...

  19. Application for Presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from...

  20. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy...

  1. Application for Presidential Permit OE Docket No. PP-394 Emera...

    Energy Savers [EERE]

    to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

  2. Application for Presidential Permit OE Docket No. PP-397 Emera...

    Energy Savers [EERE]

    to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

  3. Application for Presidential Permit OE Docket No. PP-395 Emera...

    Energy Savers [EERE]

    to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

  4. V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validation Flaw Permits Cross-Site Scripting Attacks T-701: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks...

  5. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for general construction. Published NA...

  6. The Waste Isolation Pilot Plant Hazardous Waste Facility Permit...

    Office of Environmental Management (EM)

    The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan This...

  7. Application Submittal Guidance for Stormwater Permits andPost...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Application Submittal Guidance for Stormwater Permits and Post-Authorization...

  8. U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

  9. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro:...

  10. Oregon Directive for NPDES Permits and Section 401 Water Quality...

    Open Energy Info (EERE)

    Directive for NPDES Permits and Section 401 Water Quality Certifications Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  11. ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

  12. ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

  13. Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings

    SciTech Connect (OSTI)

    Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

    1995-12-31

    Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

  14. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

  15. Streamlined Permitting Process for Renewable Energy Resources in Nevada |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren) JumpandStereoNewCreek FormationStratovolcanoOpen Energy

  16. Priority Permit Processing for Green Buildings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary AreasDepartment of2 (08-93) Previously DOE FBTO

  17. EPA Citizens Guide to Hazardous Waste Permitting Process | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (UtilityInstrumentsAreaforInformation ECrNEPAState NPDES401Information

  18. Source Water and Groundwater Withdrawal Permit Application Process Guidance

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity forSiliciumEnergy Inc JumpPennsylvania:Sound Beach, New| Open

  19. Alaska Public Participation in APDES Permitting Process | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 -Telephone Co Jump to: navigation, search

  20. Property:AirQualityPermitProcess | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly SmartDB-2,Information PromotingProperty Edit with form History

  1. Associative list processing unit

    DOE Patents [OSTI]

    Hemmert, Karl Scott; Underwood, Keith D

    2014-04-01

    An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

  2. Improved Basin Analog System to Characterize Unconventional Gas Resource 

    E-Print Network [OSTI]

    Wu, Wenyan 1983-

    2012-10-02

    potential in a target basin by finding a geological analog that has been explored enough that its resource potential is fully understood. In 2006, Singh developed a basin analog system BASIN (Basin Analog Systems INvestigation) in detail that could rapidly...

  3. A review of Title V operating permit application requirements caused by the use of waste-derived fuel at cement plants

    SciTech Connect (OSTI)

    Yarmac, R.F.

    1994-12-31

    The Clean Air Act Amendments of 1990 required the USEPA to establish a comprehensive operating permit program which is being administered by the states. Most major air pollution sources will be required to submit operating permit applications by November 15, 1995 or earlier. Portland cement plants that burn waste-derived fuel face some special permitting problems that need to be addressed during the permit application process. This paper presents a brief summary of the Title V application with special emphasis on the permitting requirements incurred by the utilization of waste fuel at cement plants.

  4. Hanford facility dangerous waste permit application

    SciTech Connect (OSTI)

    none,

    1991-09-18

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  5. Selected Parking Types Resident Parking,Permit Required

    E-Print Network [OSTI]

    Chen, Tsuhan

    Lot Night/Weekend Restricted Permit Area 10 Minute Parking,No Permit Required Parkmobile Pay-by-Cell Parking Lot North Campus B Lot Sage Hall Campus-to-Campus Stops A B C ©2013This map replaces previous Selected Parking Types Resident Parking,Permit Required Commuter Parking,Permit Required Metered Parking

  6. File:03IDCEncroachmentPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETECHIAReservedLandMineralLeasingProcess.pdfIDCEncroachmentPermit.pdf Jump to:

  7. Fifteenmile Basin Habitat Enhancement Project: Annual Report...

    Office of Scientific and Technical Information (OSTI)

    in the Fifteenmile Creek Basin. This goal was addressed under the Columbia River Basin Fish and Wildlife Program, Measure 703 (c) (1) - Action Item 4.2. Construction of fish...

  8. Water War in the Klamath Basin

    E-Print Network [OSTI]

    Carchidi, Victoria

    2011-01-01

    Review: Water War in the Klamath Basin: Macho Law, CombatHolly and A. Dan Tarlock. Water War in the Klamath Basin:has rights to the limited water. Birds and ecosystems; fish

  9. Rainfall Generator for the Rhine Basin

    E-Print Network [OSTI]

    Brandsma, Theo

    Rainfall Generator for the Rhine Basin Multi-site generation of weather variables by nearest +31.320.249218 #12;2 Rainfall Generator for the Rhine Basin #12;Multi-site generation of weather

  10. Delaware River Basin Commission (Multiple States)

    Broader source: Energy.gov [DOE]

    The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states...

  11. Multiple Oscillatory Modes of the Argentine Basin. Part II: The Spectral Origin of Basin Modes

    E-Print Network [OSTI]

    Weijer, Wilbert

    Multiple Oscillatory Modes of the Argentine Basin. Part II: The Spectral Origin of Basin Modes et Approches Numériques, Paris, France SARAH T. GILLE Scripps Institution of Oceanography, La Jolla In this paper the spectrum of barotropic basin modes of the Argentine Basin is shown to be connected

  12. Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)

    SciTech Connect (OSTI)

    Olsen, D.K.; Johnson, W.I.

    1993-05-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10`` to 20`` API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

  13. Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)

    SciTech Connect (OSTI)

    Olsen, D.K.; Johnson, W.I.

    1993-05-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10'' to 20'' API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

  14. H-Area Seepage Basins

    SciTech Connect (OSTI)

    Stejskal, G.

    1990-12-01

    During the third quarter of 1990 the wells which make up the H-Area Seepage Basins (H-HWMF) monitoring network were sampled. Laboratory analyses were performed to measure levels of hazardous constituents, indicator parameters, tritium, nonvolatile beta, and gross alpha. A Gas Chromatograph Mass Spectrometer (GCMS) scan was performed on all wells sampled to determine any hazardous organic constituents present in the groundwater. The primary contaminants observed at wells monitoring the H-Area Seepage Basins are tritium, nitrate, mercury, gross alpha, nonvolatile beta, trichloroethylene (TCE), tetrachloroethylene, lead, cadmium, arsenic, and total radium.

  15. The State of the Columbia River Basin

    E-Print Network [OSTI]

    1 The State of the Columbia River Basin Draft Fiscal Year 2009 ANNUAL REPORT To Congress and fish and wildlife policy in the Columbia River Basin and to inform the public about energy and fish Basin, and a synopsis of the major activities of the Council during the fiscal year ending September 30

  16. Supplementary information on K-Basin sludges

    SciTech Connect (OSTI)

    MAKENAS, B.J.

    1999-03-15

    Three previous documents in this series have been published covering the analysis of: K East Basin Floor and Pit Sludge, K East Basin Canister Sludge, and K West Basin Canister Sludge. Since their publication, additional data have been acquired and analyses performed. It is the purpose of this volume to summarize the additional insights gained in the interim time period.

  17. K Basins Groundwater Monitoring Task, K Basins Closure Project: Report for July, August, and September 2006

    SciTech Connect (OSTI)

    Peterson, Robert E.

    2006-12-08

    This report provides information on groundwater monitoring at the K Basins during July, August, and September 2006. Conditions remain very similar to those reported in the previous quarterly report, with no evidence in monitoring results to suggest groundwater impact from current loss of basin water to the ground. The K Basins monitoring network will be modified in the coming quarters as a consequence of remedial action at KE Basin, i.e., removal of sludge and basin demolition.

  18. UC Berkeley Welding/Cutting Permit

    E-Print Network [OSTI]

    Cohen, Ronald C.

    #12;#12;UC Berkeley Welding/Cutting Permit MUST BE POSTED ON SITE All equipment to be used for welding or cutting has been inspected and approved. All personnel (including supervisors) are trained, or protected by fire-resistant shields. (Where floors have been wet down, personnel operating arc welding

  19. Microsoft Word - Permit Table of Contents 2-2014 (2).docx

    Office of Environmental Management (EM)

    Table of Contents February 2014 WIPP Permit - Table of Contents PART 1 - GENERAL PERMIT CONDITIONS ... 1...

  20. Basin and Petroleum System Dynamics

    E-Print Network [OSTI]

    Pfander, Götz

    and development costs of new reserves and existing fields is immense: drilling wells, for example, may consume up to 85% of the total exploratory funds. Thus, the decision to drill should be taken in a sensible way of sedimentary basins and their hydrocarbon fluids. Executive Master Programme Participants will be able

  1. Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)

    Broader source: Energy.gov [DOE]

    The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

  2. Application for Approval of Modification for the 105-KE Basin Encapsulation Activity

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This application is being submitted to US EPA pursuant to Title 40, Code of Federal Regulations, Part 61.07, amended. The encapsulation activity will consist of the activities necessary to complete encapsulation of the fuel elements and sludge in 105-KE basin, a storage basin for irradiated N Reactor fuel in Hanford 100-K Area; it currently stores 1,150 MTU of N Reactor irradiated fuel elements transferred to the basin from 1975 through 1989. The application presents the chemical and physical processes relating to the encapsulation activity, source term, expected annual emissions, radionuclide control and monitoring equipment, and projected dose to the maximally exposed individual.

  3. Tradable Permits with Incomplete Monitoring: Evidence from Santiago’s Particulate Permits Program

    E-Print Network [OSTI]

    Montero, Juan-Pablo

    2006-03-14

    I explore the advantages of tradable emission permits over uniform emission standards when the regulator has incomplete information on firms’ emissions and costs of production and abatement (e.g., air pollution in large cities). Because...

  4. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    SciTech Connect (OSTI)

    Not Available

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  5. LIQUID EFFLUENT RETENTION FACILITY (LERF) BASIN 42 STUDIES

    SciTech Connect (OSTI)

    DUNCAN JB

    2004-10-29

    This report documents laboratory results obtained under test plan RPP-21533 for samples submitted by the Effluent Treatment Facility (ETF) from the Liquid Effluent Retention Facility (LERF) Basin 42 (Reference 1). The LERF Basin 42 contains process condensate (PC) from the 242-A Evaporator and landfill leachate. The ETF processes one PC campaign approximately every 12 to 18 months. A typical PC campaign volume can range from 1.5 to 2.5 million gallons. During the September 2003 ETF Basin 42 processing campaign, a recurring problem with 'gelatinous buildup' on the outlet filters from 60A-TK-I (surge tank) was observed (Figure 1). This buildup appeared on the filters after the contents of the surge tank were adjusted to a pH of between 5 and 6 using sulfuric acid. Biological activity in the PC feed was suspected to be the cause of the gelatinous material. Due to this buildup, the filters (10 {micro}m CUNO) required daily change out to maintain process throughput.

  6. Rocky Mountain Basins Produced Water Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Historical records for produced water data were collected from multiple sources, including Amoco, British Petroleum, Anadarko Petroleum Corporation, United States Geological Survey (USGS), Wyoming Oil and Gas Commission (WOGC), Denver Earth Resources Library (DERL), Bill Barrett Corporation, Stone Energy, and other operators. In addition, 86 new samples were collected during the summers of 2003 and 2004 from the following areas: Waltman-Cave Gulch, Pinedale, Tablerock and Wild Rose. Samples were tested for standard seven component "Stiff analyses", and strontium and oxygen isotopes. 16,035 analyses were winnowed to 8028 unique records for 3276 wells after a data screening process was completed. [Copied from the Readme document in the zipped file available at http://www.netl.doe.gov/technologies/oil-gas/Software/database.html] Save the Zipped file to your PC. When opened, it will contain four versions of the database: ACCESS, EXCEL, DBF, and CSV formats. The information consists of detailed water analyses from basins in the Rocky Mountain region.

  7. SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499

    SciTech Connect (OSTI)

    Langton, C.; Serrato, M.; Blankenship, J.; Griffin, W.

    2010-01-04

    The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

  8. Gas Geochemistry of the Dogger Geothermal Aquifer (Paris Basin, France)

    SciTech Connect (OSTI)

    Criaud, A.; Fouillac, C.; Marty, B.; Brach, M.; Wei, H.F.

    1987-01-20

    The low enthalpy program developed in the Paris Basin provides the opportunity for studying the gas geochemistry of the calcareous aquifer of the Dogger. Hydrocarbons and CO{sub 2} are mainly biogenic, He displays high concentrations. He, Ar and N{sub 2} have multiple origins (radioactive decay, atmospheric migration, biochemical processes). The distribution of the gases in the zones of the basin varies in relation to the general chemistry, sedimentology and hydrodynamics. The gas geothermometers do not apply to this environment but useful estimations of the redox potential of the fluid can be derived from CO{sub 2}/CH{sub 4} and N{sub 2}/NH{sub 4}{sup +} ratios. H{sub 2} and H{sub 2}S are involved in corrosion processes and scaling in the pipes. 12 refs., 3 figs., 2 tabs.

  9. Sedimentary basin geochemistry and fluid/rock interactions workshop

    SciTech Connect (OSTI)

    NONE

    1991-12-31

    Fundamental research related to organic geochemistry, fluid-rock interactions, and the processes by which fluids migrate through basins has long been a part of the U.S. Department of Energy Geosciences program. Objectives of this program were to emphasize those principles and processes which would be applicable to a wide range of problems associated with petroleum discovery, occurrence and extraction, waste disposal of all kinds, and environmental management. To gain a better understanding of the progress being made in understanding basinal fluids, their geochemistry and movement, and related research, and to enhance communication and interaction between principal investigators and DOE and other Federal program managers interested in this topic, this workshop was organized by the School of Geology and Geophysics and held in Norman, Oklahoma in November, 1991.

  10. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  11. Westinghouse and Fuzhou Permitted to Restart Distribution of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Fuzhou Permitted to Restart Distribution of Light Bulb Products Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products August 6, 2010 - 4:26pm Addthis...

  12. UPDES General Permit for Discharges from Construction Activities...

    Open Energy Info (EERE)

    from Construction Activities (Permit No. UTRC00000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: UPDES General Permit for...

  13. Exclusionary manipulation of carbon permit markets: a laboratory test

    E-Print Network [OSTI]

    Carlén, Björn.

    The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

  14. SolarTech: Sun Sets on Yesterday's Solar Permitting Practices...

    Office of Environmental Management (EM)

    SolarTech: Sun Sets on Yesterday's Solar Permitting Practices SolarTech: Sun Sets on Yesterday's Solar Permitting Practices October 1, 2012 - 3:26pm Addthis Lengthy reviews, high...

  15. Vermont Permit and License Information, Work in a State Highway...

    Open Energy Info (EERE)

    Vermont Permit and License Information, Work in a State Highway Right of Way Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  16. City and County of Denver- Solar Panel Permitting

    Office of Energy Efficiency and Renewable Energy (EERE)

    Denver provides same-day permit review for most solar panel projects. Electrical, Plumbing, and Zoning Permits* are required for photovoltaic (PV) systems installed in the city of Denver, althoug...

  17. Low-level waste vitrification plant environmental permitting plan

    SciTech Connect (OSTI)

    Gretsinger, W.T.; Colby, J.M.

    1994-10-03

    This document presents projected environmental permitting and approval requirements for the treatment and disposal of low-level Hanford tank waste by vitrification. Applicability, current status, and strategy are discussed for each potential environmental permit or approval.

  18. WIPP Hazardous Waste Facility Permit - 2008 Update

    SciTech Connect (OSTI)

    Kehrman, R.F.; Most, W.A.

    2008-07-01

    Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be submitted 180-days before the expiration date of the HWFP. At that time, the WIPP will request only one significant change, the permitting of Panel 8 to receive TRU mixed waste. (author)

  19. On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish) 

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2005-04-30

    This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

  20. Innovation and Success in Solar Permitting and Inspection

    Broader source: Energy.gov [DOE]

    This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects.

  1. Evaluation of Biodiesel Fuels from Supercritical Fluid Processing with the Advanced Distillation Curve Method

    Broader source: Energy.gov [DOE]

    Supercritical transesterification processing permits efficient fuel system and combustion chamber designs to optimize fuel utilization in diesel engines.,

  2. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water.

  3. K Basins Groundwater Monitoring Task, K Basins Closure Project: Report for January, February, and March 2007

    SciTech Connect (OSTI)

    Peterson, Robert E.

    2007-04-01

    This report describes the results of groundwater monitoring near the K Basins for the period January, February, and March 2007.

  4. Associative list processing unit

    DOE Patents [OSTI]

    Hemmert, Karl Scott; Underwood, Keith D.

    2013-01-29

    An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full. Also, an associative list processing unit and method comprising employing a plurality of prioritized cell blocks and using a tree of prioritized multiplexers descending from the plurality of cell blocks.

  5. The Design of an Emissions Permit Market for RECLAIM: A Holistic Approach

    E-Print Network [OSTI]

    Goldenberg, Evan

    1993-01-01

    31. EMISSIONS PERMIT MARKET DESIGN uities may arise because144. EMISSIONS PERMIT MARKET DESIGN schemes because it makesEMISSIONS PERMIT MARKET DESIGN auctions, it is impossible to

  6. F-Area Seepage Basins groundwater monitoring report -- third and fourth quarters 1993. Volume 1

    SciTech Connect (OSTI)

    Butler, C.T.

    1994-03-01

    During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the second half of 1993, notably aluminum, iodine-129, and zinc. The elevated constituents are found primarily in Aquifer Zone 2B{sub 2} and Aquifer Zone 2B{sub 1} wells. However, several Aquifer Unit 2A wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Water-level maps indicate that the groundwater flow rates and directions at the FASB have remained relatively constant since the basins ceased to be active in 1988.

  7. Groundwater Withdrawal Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar JumpInformation Crump's HotClimatePermit

  8. Montana 310 Permit Database | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy ResourcesDec(Pritchett, 2004)Michigan: EnergyNew0 Permit Database Jump

  9. Permit by Rule Guide | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio ProgramInformation 9thPerformance-BasedPerma Works JumpPermit

  10. Presidential Permits - Procedures | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS -Portmouth2015DepartmentPresidential

  11. Origin Basin Destination State STB EIA STB EIA Northern Appalachian...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Appalachian Basin Florida W - - - - - - - Northern Appalachian Basin Indiana W 20.35 W 64.82 31.4% 1,715 W 75.9% Northern Appalachian Basin Maryland 19.73 19.64 -0.4%...

  12. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    SciTech Connect (OSTI)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  13. Permit Allocation in Emissions Trading using the Boltzmann Distribution

    E-Print Network [OSTI]

    Park, Ji-Won; Isard, Walter

    2011-01-01

    In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...

  14. Characterization of the surface properties of Illinois Basin Coals

    SciTech Connect (OSTI)

    Demir, I.

    1991-01-01

    The overall objective of this research project is to provide fundamental data on the physical and chemical surface properties of Illinois coals, specifically those of the Illinois Basin Coal Sample Program (IBCSP). This will help coal researchers achieve an optimal match between Illinois Basin coals and potential coal cleaning and conversion processes (or at least reduce the number of coals suitable for a particular process) and may lead to improved desulfurization and increased utilization of Illinois Basin coals. The specific tasks scheduled to meet our objective are: (1) Physical Characterization: Determine total surface area, porosity, pore size and volume distributions of IBCSP coals crushed to two particle sizes, {minus}100 and {minus}400 mesh (exclusive of IBC-108 which is available only in {minus}400 mesh form), in both an unoxidized and oxidized state. (2) Chemical Characterization: Determine the surface charge (electrokinetic mobility) as a function of pH by electrophoresis and analyze the surface chemical structure of the above samples using Diffuse Reflectance Infrared Spectroscopy (DRIS). (3) Multivariate Statistical Analyses: Explore possible relationships among the newly determined surface properties and other available characterization data, including chemical and petrographic compositions, vitrinite reflectance, free swelling index, ash yield, sulfur forms, and other relevant properties.

  15. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  16. Timing and Tectonic implications of basin inversion in the Nam Con Son Basin and adjacent areas, southern South China Sea 

    E-Print Network [OSTI]

    Olson, Christopher Charles

    2001-01-01

    The Nam Con Son (NCS) Basin, located offshore of SE Vietnam, is one of several Tertiary rift basins that formed during initial Eocene(?)-Oligocene rifting. Following cessation of rifting at the end of Oligocene time, these basins were subjected...

  17. K Basins Groundwater Monitoring Task, K Basins Closure Project: Report for October, November, and December 2006

    SciTech Connect (OSTI)

    Peterson, Robert E.

    2007-03-22

    This report provides information on groundwater monitoring at the K Basins during October, November, and December 2006. Conditions remained very similar to those reported in the previous quarterly report, with no evidence in monitoring results to suggest groundwater impact from current loss of basin water to the ground. The K Basins monitoring network will be modified in the coming months as a consequence of new wells having been installed near KW Basin as part of a pump-and-treat system for chromium contamination, and new wells installed between the KE Basin and the river to augment long-term monitoring in that area.

  18. Wave Basin | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,VillageWarrensource HistoryOregon:WattQuizWaunitaWauseon,Basin

  19. Data Basin | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EA Jump to: navigation, searchDaimler Evonik JVDaofu CoBasin Jump to:

  20. CRAD, Emergency Management - Office of River Protection K Basin...

    Energy Savers [EERE]

    CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System CRAD, Emergency Management - Office of River Protection K Basin Sludge Waste System May 2004 A...

  1. Structure and Groundwater Flow in the Espanola Basin Near Rio...

    Office of Environmental Management (EM)

    Structure and Groundwater Flow in the Espanola Basin Near Rio Grande and Buckman Wellfield Structure and Groundwater Flow in the Espanola Basin Near Rio Grande and Buckman...

  2. Compound and Elemental Analysis At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Compound and Elemental Analysis At Northern Basin & Range Region (Laney, 2005) Exploration Activity Details Location Northern Basin and Range Geothermal Region Exploration...

  3. CRAD, Engineering - Office of River Protection K Basin Sludge...

    Energy Savers [EERE]

    CRAD, Engineering - Office of River Protection K Basin Sludge Waste System CRAD, Engineering - Office of River Protection K Basin Sludge Waste System May 2004 A section of Appendix...

  4. EIS-0522: Melvin R. Sampson Hatchery, Yakima Basin Coho Project...

    Energy Savers [EERE]

    EIS-0522: Melvin R. Sampson Hatchery, Yakima Basin Coho Project; Kittitas County, Washington EIS-0522: Melvin R. Sampson Hatchery, Yakima Basin Coho Project; Kittitas County,...

  5. F-area seepage basins groundwater monitoring report. Volume 1. First and second quarters 1995

    SciTech Connect (OSTI)

    1995-09-01

    Groundwater at the F-Area Seepage Basins (FASB) is monitored in compliance with Module 111, Section C, of South Carolina Hazardous Waste Permit SCl-890-008-989, effective November 2, 1992. The monitoring well network is composed of 86 FSB wells and well HSB 85A. These wells are screened in the three hydrostratigraphic Units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1900. Data from 9 FSL wells are included in this report only to provide additional information for this area; the FSL wells are not part of Permit SCl-890-008-989. Monitoring results are compared to the SCDHEC Groundwater Protection Standard (GWPS), which is specified in the approved F-Area Seepage Basins Part B permit (November 1992). Historically and currently, gross alpha, nitrate, nonvolatile beta, and tritium are among the primary constituents to exceed standards. Numerous other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the FASB during the first half of 1995, notably aluminum, iodine-129, pH, strontium-90, and zinc. The elevated constituents are found primarily in Aquifer Zone IIB{sub 2} (Water Table) and Aquifer Zone IIB{sub 1}, (Barnwell/McBean) wells. However, several Aquifer Unit IIA (Congaree) wells also contain elevated levels of constituents. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units. Geologic cross sections indicate both the extent and depth of contamination of the primary contaminants in all of the hydrostratigraphic units during the first half of 1995.

  6. 2010 Expenditures Report Columbia River Basin Fish

    E-Print Network [OSTI]

    tables 27 Table 1A: Total Cost of BPA Fish & Wildlife Actions 29 Table 1B: Cumulative Expenditures 1978 and habitat, of the Columbia River Basin that have been affected by hydroelectric development. This program fish and wildlife affected by hydropower dams in the Columbia River Basin. The Power Act requires

  7. Great Salt Lake Basin Hydrologic Observatory

    E-Print Network [OSTI]

    Tarboton, David

    Great Salt Lake Basin Hydrologic Observatory Contact Information David Tarboton Utah State University of Utah 135 South 1460 East Rm 719 Salt Lake City, Utah (801) 581-5033 wjohnson. The Great Salt Lake Basin Hydrologic Observatory development team is highly committed to this concept

  8. 6, 839877, 2006 Mexico City basin

    E-Print Network [OSTI]

    Boyer, Edmond

    emitters of air pollutants leading to negative health effects and environmental degradation. The rate altitude basin with air pollutant concentrations above the health limits most days of the year. A mesoscale-dimensional wind patterns in25 the basin and found that the sea-breeze transports the polluted air mass up the moun

  9. Financial Sustainability of International River Basin Organizations

    E-Print Network [OSTI]

    Wolf, Aaron

    Financial Sustainability of International River Basin Organizations Final Report #12;Published by financing of a sample of African, Asian and European River Basin Organizations (RBOs). Its focus contributions to cov- er their regular run-ning costs. To a degree, the financial challenges some African RBOs

  10. urricane activity in the Atlantic basin increased

    E-Print Network [OSTI]

    with levels in the 1970s and 1980s. For example, the accumulated cyclone energy (ACE) index in the Atlantic of disturbances. Bottom: annual number (Aug­Oct) of North Atlantic basin hurricanes (1980­2005). See figures 2, is a crucial question for the future outlook of hurricane activity in the basin. It is difficult to distinguish

  11. Sediment infill within rift basins: Facies distribution and effects of deformation: Examples from the Kenya and Tanganyika Rifts, East Africa

    SciTech Connect (OSTI)

    Tiercelin, J.J.; Lezzar, K.E. ); Richert, J.P. )

    1994-07-01

    Oil is known from lacustrine basins of the east African rift. The geology of such basins is complex and different depending on location in the eastern and western branches. The western branch has little volcanism, leading to long-lived basins, such as Lake Tanganyika, whereas a large quantity of volcanics results in the eastern branch characterized by ephemeral basins, as the Baringo-Bogoria basin in Kenya. The Baringo-Bogoria basin is a north-south half graben formed in the middle Pleistocene and presently occupied by the hypersaline Lake Bogoria and the freshwater Lake Baringo. Lake Bogoria is fed by hot springs and ephemeral streams controlled by grid faults bounding the basin to the west. The sedimentary fill is formed by cycles of organic oozes having a good petroleum potential and evaporites. On the other hand, and as a consequence of the grid faults, Lake Baringo is fed by permanent streams bringing into the basin large quantities of terrigenous sediments. Lake Tanganyika is a meromictic lake 1470 m deep and 700 km long, of middle Miocene age. It is subdivided into seven asymmetric half grabens separated by transverse ridges. The sedimentary fill is thick and formed by organic oozes having a very good petroleum potential. In contrast to Bogoria, the lateral distribution of organic matter is characterized by considerable heterogeneity due to the existence of structural blocks or to redepositional processes.

  12. VENTURA BASIN LOS ANGELES BASIN CENTRAL COASTAL BASIN W Y T

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963 1.969 1.979Coal Consumers inYear JanSalesa.E. Great Basin OilVENTURA

  13. Environmental Permitting of a Low-BTU Coal Gasification Facility 

    E-Print Network [OSTI]

    Murawczyk, C.; Stewart, J. T.

    1983-01-01

    plan indicating the design of the landfill, description of the surface and subsurface hydrology and any unique environmental problems or constraints. A detailed plan of operation, closure and part closure activities had to also be prOVided as part... Quality Discharge Natural Resources Permit Solid Waste Permits Louisiana Department Solid Waste Landfill Con of Natural Resources, struction Permit Solid Waste Management Division Since the project was conceived as a modifica tion to an existing...

  14. Division of Oil, Gas, and Mining Permitting

    E-Print Network [OSTI]

    Utah, University of

    " or "Gas" does not include any gaseous or liquid substance processed from coal, oil shale, or tar sands

  15. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices

    SciTech Connect (OSTI)

    Copping, Andrea E.; Geerlofs, Simon H.; Hanna, Luke A.

    2014-06-30

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

  16. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    SciTech Connect (OSTI)

    Copping, Andrea E.; Geerlofs, Simon H.; Hanna, Luke A.

    2013-09-30

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  17. Clark County- Solar and Wind Building Permit Guides

    Broader source: Energy.gov [DOE]

    Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

  18. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Energy Savers [EERE]

    Conservation Law Foundation, Appalachian Mountain Club, and Society for the Protection of New Hampshire Forests Application for Presidential Permit OE Docket No. PP-371 Northern...

  19. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application from...

  20. Application for Presidential Permit OE Docket No: PP-371 Northern...

    Office of Environmental Management (EM)

    OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission:...

  1. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments from Stephen Buzzell and Lelah Sullivan Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy...

  2. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Pass Transmission: Comments from Linda Upham Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy...

  3. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application from Northern Pass to construct, operate and maintain...

  4. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission:...

  5. Application for Permit to Construct Access Driveway Facilities...

    Open Energy Info (EERE)

    relocate an access connection to state ROWs. Published NA Year Signed or Took Effect 2000 Legal Citation Application for Permit to Construct Access Driveway Facilities on...

  6. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  7. Nevada Industrial Solid Waste Disposal Site Permit Application...

    Open Energy Info (EERE)

    Nevada Industrial Solid Waste Disposal Site Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Nevada Industrial Solid Waste Disposal Site...

  8. File:CDPHE Industrial Individual Wastewater Discharge Permit...

    Open Energy Info (EERE)

    Help Apps Datasets Community Login | Sign Up Search File Edit History File:CDPHE Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search...

  9. Application for Presidential Permit OE Docket No. PP-369 British...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission...

  10. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    87 Soule Hydro: Comments from Senator Lisa Murkowski Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Senator Lisa Murkowski Application from...

  11. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application from Soule Hydro to construct, operate...

  12. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dept. of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture Application from Soule Hydro to construct, operate and...

  13. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Environmental Management (EM)

    Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture...

  14. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and maintain electric...

  15. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    S - Canada Border. Federal Register Notice. PP-387 Soule Hydro FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments...

  16. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Peggy Wilson Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson Application from Soule Hydro to...

  17. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct, operate and...

  18. Application for presidential permit OE Docket No. PP-300 Maine...

    Broader source: Energy.gov (indexed) [DOE]

    Applicationfrom Maine Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE...

  19. Application for presidential permit OE Docket No. PP-334 Energia...

    Energy Savers [EERE]

    Sierra Juarex U.S Transmission LLC: Notice of Intent To Prepare an Environmental Impact Statement. Application for presidential permit OE Docket No. PP-334 Energia Sierra...

  20. Application for presidential permit OE Docket No. PP-334 Energia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LLC - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36 - Feb. 25, 2009 Application for presidential permit OE Docket No. PP-334...

  1. V-153: Symantec Brightmail Gateway Input Validation Flaw Permits...

    Broader source: Energy.gov (indexed) [DOE]

    T-701: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks U-001:Symantec IM Manager Input Validation Flaws...

  2. Los Alamos National Laboratory Hazardous Waste Facility Permit...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazardous Waste Facility Permit Draft Community Relations Plan CommentSuggestion Form Instructions for completing the form: Please reference the section in the plan that your...

  3. Application for Presidential Permit OE Docket No. PP-059 Central...

    Energy Savers [EERE]

    (CPL) to construct, operate and maintain electric transmission facilities at the U.S. - Mexico Border Application for Presidential Permit OE Docket No. PP-59 Central Power and...

  4. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Energy Savers [EERE]

    98 Minnesota Power - Great Northern Transmission Line Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line Response letter...

  5. Montana Ground Water Pollution Control System Permit Application...

    Open Energy Info (EERE)

    Montana Ground Water Pollution Control System Permit Application Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water...

  6. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application from Montana Alberta Tie Ltd to construct, operate, and maintain...

  7. Application for presidential permit OE Docket No. PP-305 Montana...

    Broader source: Energy.gov (indexed) [DOE]

    Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-305...

  8. Application for presidential permit OE Docket No. PP-305 Montana...

    Broader source: Energy.gov (indexed) [DOE]

    Scope Change 1 PP-305 Montana Alberta Tie LTD More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update...

  9. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application from Soule Hydro to...

  10. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the DOE point of contact and program Web site. Federal Register Notice. PP-387 Soule Hydro FRN Correction.pdf More Documents & Publications Application for Presidential Permit...

  11. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct,...

  12. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and...

  13. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydro, LLC Application for Presidential Permit OE Docket No. PP-387 Soule Hydro, LLC Application from Soule Hydro to construct, operate and maintain electric transmission...

  14. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    Open Energy Info (EERE)

    Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination of Project Costs Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  15. Presidential Permits and Export Authorizations - About the Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    transmission lines which cross the U.S. international border; and 2.Authorizing exports of electric energy to foreign countries. The authority to grant Presidential permits...

  16. Notice of Termination for Authorization under TPDES General Permit...

    Open Energy Info (EERE)

    Termination for Authorization under TPDES General Permit (TXR150000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Notice of Termination for...

  17. Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)

    SciTech Connect (OSTI)

    Young, K.

    2014-04-01

    Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

  18. Application for presidential permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    submitted an application for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons...

  19. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Office of Environmental Management (EM)

    - New England Clean Power Link Project - Motion to Intervene and Comments of the Vermont Department of Public Service - August 6, 2014 Application for Presidential Permit OE...

  20. OAR 340-120 - Additional Siting and Permitting Requirements for...

    Open Energy Info (EERE)

    Page Edit with form History OAR 340-120 - Additional Siting and Permitting Requirements for Hazardous Waste and PCB Treatment and Disposal Facilities Jump to: navigation, search...

  1. Application for a Colorado State Permit for Achaeological or...

    Open Energy Info (EERE)

    Provided, 92011 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Application for a Colorado State Permit for Achaeological or...

  2. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

  3. Application for Presidential Permit OE Docket No. PP-235 Sempra...

    Energy Savers [EERE]

    35 Sempra Energy Resources. Application for Presidential Permit OE Docket No. PP-235 Sempra Energy Resources. Application from Sempra Energy Resources to construct, operate and...

  4. Presidential Permits and Export Authorizations - About the Program...

    Office of Environmental Management (EM)

    electric energy to foreign countries. The authority to grant Presidential permits is derived from the constitutional power of the President to protect the territorial integrity...

  5. Neuse River Basin, North Carolina Ecosystem Restoration Project

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Neuse River Basin, North Carolina Ecosystem Restoration Project 5 October 2012 ABSTRACT: The study area encompasses the Neuse River Basin, the third-largest river basin in North Carolina. The Basin, upstream of the city of New Bern, North Carolina. At New Bern the river broadens dramatically and changes

  6. SUTTER BASIN, SUTTER & BUTTE COUNTIES, CA FLOOD RISK MANAGEMENT PROJECT

    E-Print Network [OSTI]

    US Army Corps of Engineers

    SUTTER BASIN, SUTTER & BUTTE COUNTIES, CA FLOOD RISK MANAGEMENT PROJECT 22 October 2013 ABSTRACT: The purpose of the Sutter Basin Project is to reduce overall flood risk to the Sutter Basin study area the risk to property damage due to flooding to the Sutter Basin area located in the Sutter and Butte

  7. Enforceable Security Policies Revisited DAVID BASIN, ETH Zurich

    E-Print Network [OSTI]

    Basin, David

    A Enforceable Security Policies Revisited DAVID BASIN, ETH Zurich VINCENT JUG´E, MINES Paris: Basin, D., Jug´e, V., Klaedtke, F., Zalinescu, E. Enforceable Security Policies Revisited. To appear is an extended version of the conference paper [Basin et al. 2012a]. Author's addresses: D. Basin, F. Klaedtke

  8. Delaware Basin Monitoring Annual Report

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2005-09-30

    The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

  9. Evaluation of Phytoremediation of Coal Bed Methane Product Water and Waters of Quality Similar to that Associated with Coal Bed Methane Reserves of the Powder River Basin, Montana and Wyoming

    SciTech Connect (OSTI)

    James Bauder

    2008-09-30

    U.S. emphasis on domestic energy independence, along with advances in knowledge of vast biogenically sourced coalbed methane reserves at relatively shallow sub-surface depths with the Powder River Basin, has resulted in rapid expansion of the coalbed methane industry in Wyoming and Montana. Techniques have recently been developed which constitute relatively efficient drilling and methane gas recovery and extraction techniques. However, this relatively efficient recovery requires aggressive reduction of hydrostatic pressure within water-saturated coal formations where the methane is trapped. Water removed from the coal formation during pumping is typically moderately saline and sodium-bicarbonate rich, and managed as an industrial waste product. Current approaches to coalbed methane product water management include: surface spreading on rangeland landscapes, managed irrigation of agricultural crop lands, direct discharge to ephermeral channels, permitted discharge of treated and untreated water to perennial streams, evaporation, subsurface injection at either shallow or deep depths. A Department of Energy-National Energy Technology Laboratory funded research award involved the investigation and assessment of: (1) phytoremediation as a water management technique for waste water produced in association with coalbed methane gas extraction; (2) feasibility of commercial-scale, low-impact industrial water treatment technologies for the reduction of salinity and sodicity in coalbed methane gas extraction by-product water; and (3) interactions of coalbed methane extraction by-product water with landscapes, vegetation, and water resources of the Powder River Basin. Prospective, greenhouse studies of salt tolerance and water use potential of indigenous, riparian vegetation species in saline-sodic environments confirmed the hypothesis that species such as Prairie cordgrass, Baltic rush, American bulrush, and Nuttall's alkaligrass will thrive in saline-sodic environments when water supplies sourced from coalbed methane extraction are plentiful. Constructed wetlands, planted to native, salt tolerant species demonstrated potential to utilize substantial volumes of coalbed methane product water, although plant community transitions to mono-culture and limited diversity communities is a likely consequence over time. Additionally, selected, cultured forage quality barley varieties and native plant species such as Quail bush, 4-wing saltbush, and seaside barley are capable of sustainable, high quality livestock forage production, when irrigated with coalbed methane product water sourced from the Powder River Basin. A consequence of long-term plant water use which was enumerated is elevated salinity and sodicity concentrations within soil and shallow alluvial groundwater into which coalbed methane product water might drain. The most significant conclusion of these investigations was the understanding that phytoremediation is not a viable, effective technique for management of coalbed methane product water under the present circumstances of produced water within the Powder River Basin. Phytoremediation is likely an effective approach to sodium and salt removal from salt-impaired sites after product water discharges are discontinued and site reclamation is desired. Coalbed methane product water of the Powder River Basin is most frequently impaired with respect to beneficial use quality by elevated sodicity, a water quality constituent which can cause swelling, slaking, and dispersion of smectite-dominated clay soils, such as commonly occurring within the Powder River Basin. To address this issue, a commercial-scale fluid-bed, cationic resin exchange treatment process and prototype operating treatment plant was developed and beta-tested by Drake Water Technologies under subcontract to this award. Drake Water Technologies secured U.S. Patent No. 7,368,059-B2, 'Method for removal of benevolent cations from contaminated water', a beta Drake Process Unit (DPU) was developed and deployed for operation in the Powder River Basin. First year operatio

  10. Hanford facility dangerous waste permit application, general information portion. Revision 3

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

  11. K Basins Groundwater Monitoring Task, K Basins Closure Project: Report for April, May, and June 2007

    SciTech Connect (OSTI)

    Peterson, Robert E.

    2007-08-08

    This report provides information on groundwater monitoring near the K Basins during April, May, and June 2007. Conditions remained similar to those reported in the previous quarter’s report, with no evidence in monitoring results to suggest groundwater impact from current loss of shielding water from either basin to the ground. During the current quarter, the first results from two new wells installed between KE Basin and the river became available. Groundwater conditions at each new well are reasonably consistent with adjacent wells and expectations, with the exception of anomalously high chromium concentrations at one of the new wells. The K Basins monitoring network will be modified for FY 2008 to take advantage of new wells recently installed near KW Basin as part of a pump-and-treat system for chromium contamination, and also the new wells recently installed between the KE Basin and the river, which augment long-term monitoring capability in that area.

  12. Modeling and Risk Assessment of CO{sub 2} Sequestration at the Geologic-basin Scale

    SciTech Connect (OSTI)

    Juanes, Ruben

    2013-08-31

    Objectives. The overall objective of this proposal was to develop tools for better understanding, modeling and risk assessment of CO{sub 2} permanence in geologic formations at the geologic basin scale. The main motivation was that carbon capture and storage (CCS) will play an important role as a climate change mitigation technology only if it is deployed at scale of gigatonne per year injections over a period of decades. Continuous injection of this magnitude must be understood at the scale of a geologic basin. Specifically, the technical objectives of this project were: (1) to develop mathematical models of capacity and injectivity at the basin scale; (2) to apply quantitative risk assessment methodologies that will inform on CO{sub 2} permanence; (3) to apply the models to geologic basins across the continental United States. These technical objectives go hand-in-hand with the overarching goals of: (1) advancing the science for deployment of CCS at scale; and (2) contributing to training the next generation of scientists and engineers that will implement and deploy CCS in the United States and elsewhere. Methods. The differentiating factor of this proposal was to perform fundamental research on migration and fate of CO{sub 2} and displaced brine at the geologic basin scale. We developed analytical sharp-interface models of the evolution of CO{sub 2} plumes over the duration of injection (decades) and after injection (centuries). We applied the analytical solutions of CO{sub 2} plume migration and pressure evolution to specific geologic basins, to estimate the maximum footprint of the plume, and the maximum injection rate that can be sustained during a certain injection period without fracturing the caprock. These results have led to more accurate capacity estimates, based on fluid flow dynamics, rather than ad hoc assumptions of an overall “efficiency factor.” We also applied risk assessment methodologies to evaluate the uncertainty in our predictions of storage capacity and leakage rates. This was possible because the analytical mathematical models provide ultrafast forward simulation and they contain few parameters. Impact. The project has been enormously successful both in terms of its scientific output (journal publications) as well as impact in the government and industry. The mathematical models and uncertainty quantification methodologies developed here o?er a physically-based approach for estimating capacity and leakage risk at the basin scale. Our approach may also facilitate deployment of CCS by providing the basis for a simpler and more coherent regulatory structure than an “individual-point-of-injection” permitting approach. It may also lead to better science-based policy for post-closure design and transfer of responsibility to the State.

  13. Funding Mechanisms for Federal Geothermal Permitting (Presentation)

    SciTech Connect (OSTI)

    Witherbee, K.

    2014-03-01

    This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

  14. WATER POLLUTION CONTROL GENERAL PERMIT GNEV93001

    National Nuclear Security Administration (NNSA)

    will be discharged into treatment works without first being processed through an oilwater separator. Other methods require NDEP concurrence. I.F.4. The NNSANSO, with...

  15. IFQ Permit Holder Fee Submission Form Page 1 of 8

    E-Print Network [OSTI]

    Marine Fisheries Service (NMFS) Operations & Management Division (OMD) P.O. Box 21668 Juneau, Alaska or money order, make payable to National Marine Fisheries Service REMINDER! Sign your check. NOTE-vessel value or price. #12;IFQ Permit Holder Fee Submission Form Page 3 of 8 BLOCK F ­ FEE CALCULATION Permit

  16. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1995-09-05

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  17. Waste Feed Delivery Environmental Permits and Approvals Plan

    SciTech Connect (OSTI)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  18. Geology and remarkable thermal activity of Norris Geyser Basin, Yellowstone National Park, Wyoming

    SciTech Connect (OSTI)

    White, D.E.; Hutchinson, R.A.; Keith, T.E.C.

    1988-01-01

    Norris Geyser Basin is adjacent to the north rim of the Yellowstone caldera at the common intersection of the caldera rim and the Norris-Mammoth Corridor, a zone of faults, volcanic vents, and thermal activity that strikes north from the caldera rim to Mammoth Hot Springs. The dominant quartz sand is hydrothermally cemented by chalcedony and is extremely hard, thereby justifying the term hydrothermal quartzite. The fundamental water type in Norris Basin is nearly neutral in pH and high in Cl and SiO/sub 2/. Another common type of water in Norris Basin is high in SO/sub 4/ and moderately high in Cl, with Cl/SO/sub 4/ ratios differing considerably. This study provides no new conclusive data on an old problem, the source or sources of rare dissolved constitutents. An important part of this paper consists of examples of numerous changes in behavior and chemical composition of most springs and geysers, to extents not known elsewhere in the park and perhaps in the world. Hydrothermal mineralogy in core samples from three research holes drilled entirely in Lava Creek Tuff to a maximum depth of -331.6 m permits an interpretation of the hydrothermal alteration history. A model for large, long-lived, volcanic-hydrothermal activity is also suggested, involving all of the crust and upper mantle and using much recent geophysical data bearing on crust-mantle interrelations.

  19. Progress Update: H4 Basin Concrete Pour

    ScienceCinema (OSTI)

    None

    2012-06-14

    The Recovery Act funded project in the H area basin. A concrete ditch built longer than half a mile to prevent contaminated water from expanding and to reduce the footprint on the environment.

  20. The Uinta Basin Case Robert J. Bayer

    E-Print Network [OSTI]

    Utah, University of

    Overburden Tailings Oil Shale Mining Open Pit Underground Ex situ extraction Ex situ thermal conversion EIS for Oil Sands and Oil Shale Ongoing concerns with Basin-wide air quality Wildlife and wildlife

  1. K-Basins S/RIDS

    SciTech Connect (OSTI)

    Watson, D.J.

    1995-09-22

    The Standards/Requirements Identification Document(S/RID) is a list of the Environmental, Safety, and Health (ES&H) and Safeguards and Security (SAS) standards/requirements applicable to the K Basins facility

  2. K-Basins S/RIDS

    SciTech Connect (OSTI)

    Watson, D.J.

    1997-08-01

    The Standards/Requirements Identification Document (S/RID) is a list of the Environmental, Safety, and Health (ES{ampersand}H) and Safeguards and Security (SAS) standards/requirements applicable to the K Basins facility.

  3. Flathead Basin Commission Act of 1983 (Montana)

    Broader source: Energy.gov [DOE]

    This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

  4. River Basins Advisory Commissions (South Carolina)

    Broader source: Energy.gov [DOE]

    The Catawba/Wateree and Yadkin/Pee Dee River Basins Advisory Commissions are permanent public bodies jointly established by North and South Carolina. The commissions are responsible for assessing...

  5. Investigation of glacial dynamics in lambert glacial basin using satellite remote sensing techniques 

    E-Print Network [OSTI]

    Yu, Jaehyung

    2006-04-12

    melting is apparently the dominant discharging process of the system. The melting rate for the Amery Ice Shelf decreases rapidly from the grounding zone (21.64 ± 2.17 m/year) to the ice shelf front (-0.95 ± 0.14 m/year). The Lambert Glacial Basin...

  6. DECOUPLING AND BLOCK PRECONDITIONING FOR SEDIMENTARY BASIN SIMULATIONS IN TEMIS3D

    E-Print Network [OSTI]

    Bath, University of

    is then in the second stage preconditioned by eÆcient methods like AMG. The third step #12;nally consists in \\recoupling major oil companies. Ideally a basin simulator should span the entire process of source rock burial, hydrocarbon generation, expulsion, migration into a potential trap, and assessment of trap integrity

  7. Fluid flow and CO2fluidmineral interactions during CO2-storage in sedimentary basins

    E-Print Network [OSTI]

    Cambridge, University of

    mineral dissolution rates. Observations from CO2-EOR exper- iments and natural analogues suggestFluid flow and CO2­fluid­mineral interactions during CO2-storage in sedimentary basins Niko Kampman Natural CO2 analogues Modelling the progress of geochemical processes in CO2 storage sites is frustrated

  8. Sandstone cementation and fluids in hydrocarbon basins R.S. Haszeldinea,*, C.I. Macaulaya

    E-Print Network [OSTI]

    Haszeldine, Stuart

    Sandstone cementation and fluids in hydrocarbon basins R.S. Haszeldinea,*, C.I. Macaulaya , A there is an intermediate view. Processes governing sandstone cementation in the deep sub-surface are elusive, case have driven studies of sandstone cementation in the past ten years: Firstly, the economic motive

  9. Feasibility study of heavy oil recovery in the Appalachian, Black Warrior, Illinois, and Michigan basins

    SciTech Connect (OSTI)

    Olsen, D.K.; Rawn-Schatzinger, V.; Ramzel, E.B.

    1992-07-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Appalachian, Black Warrior, Illinois, and Michigan basins cover most of the depositional basins in the Midwest and Eastern United States. These basins produce sweet, paraffinic light oil and are considered minor heavy oil (10{degrees} to 20{degrees} API gravity or 100 to 100,000 cP viscosity) producers. Heavy oil occurs in both carbonate and sandstone reservoirs of Paleozoic Age along the perimeters of the basins in the same sediments where light oil occurs. The oil is heavy because escape of light ends, water washing of the oil, and biodegradation of the oil have occurred over million of years. The Appalachian, Black Warrior, Illinois, and Michigan basins' heavy oil fields have produced some 450,000 bbl of heavy oil of an estimated 14,000,000 bbl originally in place. The basins have been long-term, major light-oil-producing areas and are served by an extensive pipeline network connected to refineries designed to process light sweet and with few exceptions limited volumes of sour or heavy crude oils. Since the light oil is principally paraffinic, it commands a higher price than the asphaltic heavy crude oils of California. The heavy oil that is refined in the Midwest and Eastern US is imported and refined at select refineries. Imports of crude of all grades accounts for 37 to >95% of the oil refined in these areas. Because of the nature of the resource, the Appalachian, Black Warrior, Illinois and Michigan basins are not expected to become major heavy oil producing areas. The crude oil collection system will continue to degrade as light oil production declines. The demand for crude oil will increase pipeline and tanker transport of imported crude to select large refineries to meet the areas' liquid fuels needs.

  10. Feasibility study of heavy oil recovery in the Appalachian, Black Warrior, Illinois, and Michigan basins

    SciTech Connect (OSTI)

    Olsen, D.K.; Rawn-Schatzinger, V.; Ramzel, E.B.

    1992-07-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Appalachian, Black Warrior, Illinois, and Michigan basins cover most of the depositional basins in the Midwest and Eastern United States. These basins produce sweet, paraffinic light oil and are considered minor heavy oil (10{degrees} to 20{degrees} API gravity or 100 to 100,000 cP viscosity) producers. Heavy oil occurs in both carbonate and sandstone reservoirs of Paleozoic Age along the perimeters of the basins in the same sediments where light oil occurs. The oil is heavy because escape of light ends, water washing of the oil, and biodegradation of the oil have occurred over million of years. The Appalachian, Black Warrior, Illinois, and Michigan basins` heavy oil fields have produced some 450,000 bbl of heavy oil of an estimated 14,000,000 bbl originally in place. The basins have been long-term, major light-oil-producing areas and are served by an extensive pipeline network connected to refineries designed to process light sweet and with few exceptions limited volumes of sour or heavy crude oils. Since the light oil is principally paraffinic, it commands a higher price than the asphaltic heavy crude oils of California. The heavy oil that is refined in the Midwest and Eastern US is imported and refined at select refineries. Imports of crude of all grades accounts for 37 to >95% of the oil refined in these areas. Because of the nature of the resource, the Appalachian, Black Warrior, Illinois and Michigan basins are not expected to become major heavy oil producing areas. The crude oil collection system will continue to degrade as light oil production declines. The demand for crude oil will increase pipeline and tanker transport of imported crude to select large refineries to meet the areas` liquid fuels needs.

  11. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    SciTech Connect (OSTI)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO? captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO? into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly success

  12. HYDROLOGIC PROCESSES INFLUENCING STREAMFLOW VARIATION IN FRYXELL BASIN, ANTARCTICA

    E-Print Network [OSTI]

    MacDonald, Lee

    is less than 10 cm yrl[Bromley, 1985], and much of this is quickly lost to sublimation. Solar radiation. Average incoming solar radiation on the glaciers ranged from 18 to 52 W m-2 during the 1994-1995 season in the valley bottoms. This paper analyzes the physiographic characteristics and six years of discharge data

  13. K Basins Sludge Treatment Process | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS/9/09 OfficeJuneofby:JustK

  14. H-Area seepage basins groundwater monitoring report. Volume 1, First and second quarters 1995

    SciTech Connect (OSTI)

    1995-09-01

    Groundwater at the H-Area Seepage Basins (HASB) is monitored in compliance with the September 30, 1992, modification of South Carolina Hazardous Waste Permit SCl-890-008-989. The monitoring wells network is composed of 130 HSB wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Data from 16 HSL wells are included in this report only to provide additional information for the HASB. Monitoring results are compared to the SCDHEC Groundwater Protection Standard (GWPS), established in Appendix IIID-A of the permit. Historically as well as currently, nitrate, nonvolatile beta, and tritium have been among the primary constituents to exceed standards. Other radionuclides and hazardous constituents also exceeded the GWPS in the groundwater at the HASB (notably aluminum, iodine-129, strontium-90, and zinc) during the first half of 1995. Elevated constituents were found primarily in Aquifer Zone IIB and in the upper portion of Aquifer Zone IIB. However, constituents exceeding standards also occurred in several wells screened in the lower portion of Aquifer Zone IIB, and Aquifer Unit IIA.

  15. 4561Federal Register / Vol. 73, No. 17 / Friday, January 25, 2008 / Notices 10 and 404 Permit, West Basin

    E-Print Network [OSTI]

    about air quality and wetland impacts, and recommended air quality mitigation measures and the selection agency. EIS No. 20080003, ERP No. F­AFS­ L65540­WA, Old Curlew Ranger Station Facilities Disposal Project Updated Information, Evaluation of Three New Alternatives on Operational Changes to the Current Water

  16. RENEWAL OF WORK PERMITS/STUDENT AUTHORIZATIONS FOR MSP Please note that copies of work permits/student authorizations must be submitted to

    E-Print Network [OSTI]

    Kavanagh, Karen L.

    RENEWAL OF WORK PERMITS/STUDENT AUTHORIZATIONS FOR MSP Please note that copies of work permits in which a Work Permit or Student Authorization expires. If they are renewed, coverage will only) If the renewal date is the day immediately following the expiration of the previous permit

  17. Experience in automating the Title V permit application

    SciTech Connect (OSTI)

    Ashcraft, T. [Warren Petroleum Co., Tulsa, OK (United States); O`Brien, J. [Process Data Control Corp., Dallas, TX (United States)

    1995-12-31

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  18. SLUDGE RETRIEVAL FROM HANFORD K WEST BASIN SETTLER TANKS

    SciTech Connect (OSTI)

    ERPENBECK EG; LESHIKAR GA

    2011-01-13

    In 2010, an innovative, remotely operated retrieval system was deployed to successfully retrieve over 99.7% of the radioactive sludge from ten submerged tanks in Hanford's K-West Basin. As part of K-West Basin cleanup, the accumulated sludge needed to be removed from the 0.5 meter diameter by 5 meter long settler tanks and transferred approximately 45 meters to an underwater container for sampling and waste treatment. The abrasive, dense, non-homogeneous sludge was the product of the washing process of corroded nuclear fuel. It consists of small (less than 600 micron) particles of uranium metal, uranium oxide, and various other constituents, potentially agglomerated or cohesive after 10 years of storage. The Settler Tank Retrieval System (STRS) was developed to access, mobilize and pump out the sludge from each tank using a standardized process of retrieval head insertion, periodic high pressure water spray, retraction, and continuous pumping of the sludge. Blind operations were guided by monitoring flow rate, radiation levels in the sludge stream, and solids concentration. The technology developed and employed in the STRS can potentially be adapted to similar problematic waste tanks or pipes that must be remotely accessed to achieve mobilization and retrieval of the sludge within.

  19. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  20. Structural and stratigraphic evolution of Shira Mountains, central Ucayali Basin, Peru? 

    E-Print Network [OSTI]

    Sanchez Alvarez, Jaime Orlando

    2008-10-10

    The Ucayali Basin is a Peruvian sub-Andean basin that initially formed during the extensive tectonics of the Early Paleozoic. Originally, the Ucayali Basin was part of a larger basin that extended east of the current ...

  1. PERMITTING OF A PROJECT INVOLVING HYDROGEN: A CODE OFFICIAL’S PERSPECTIVE

    SciTech Connect (OSTI)

    Kallman, Richard A.; Barilo, Nick F.; Murphy, W. F.

    2012-05-11

    Recent growth in the development of hydrogen infrastructure has led to more requests for code officials to approve hydrogen-related projects and facilities. To help expedite the review and approval process, significant efforts have been made to educate code officials on permitting hydrogen vehicle fueling stations and facilities using stationary fuel cells (e.g., backup power for telephone cell tower sites). Despite these efforts, project delays continue because of several factors, including the limited experience of code officials with these types of facilities, submittals that lack the required information (including failure to adequately address local requirements), and submission of poor quality documents. The purpose of this paper is to help project proponents overcome these potential roadblocks and obtain timely approval for a project. A case study of an actual stationary application permitting request is provided to illustrate the value of addressing these issues.

  2. Results of Groundwater Monitoring for the 183-H Solar Evaporation Basins Reporting Period: July-December 2006

    SciTech Connect (OSTI)

    Hartman, Mary J.

    2007-04-10

    This is one of a series of reports on Resource Conservation and Recovery Act monitoring at the 183 H basins. It fulfills a requirement of WAC 173-303-645(11)(g) to report twice each year on the effectiveness of the corrective action program. This report covers the period from July through December 2006. The current objective of corrective action monitoring is simply to track trends. Although there is short-term variability in contaminant concentrations, trends over the past 10 years are downward. The current RCRA permit and monitoring plan remain adequate for the objective of tracking trends.

  3. 105-K Basin Material Design Basis Feed Description for Spent Nuclear Fuel (SNF) Project Facilities VOL 1 Fuel

    SciTech Connect (OSTI)

    PACKER, M.J.

    1999-11-04

    Metallic uranium Spent Nuclear Fuel (SNF) is currently stored within two water filled pools, 105-KE Basin (KE Basin) and 105-KW Basin (KW Basin), at the United States Department of Energy (U.S. DOE) Hanford Site, in southeastern Washington State. The Spent Nuclear Fuel Project (SNF Project) is responsible to DOE for operation of these fuel storage pools and for the 2100 metric tons of SNF materials that they contain. The SNF Project mission includes safe removal and transportation of all SNF from these storage basins to a new storage facility in the 200 East Area. To accomplish this mission, the SNF Project modifies the existing KE Basin and KW Basin facilities and constructs two new facilities: the 100 K Area Cold Vacuum Drying Facility (CVDF), which drains and dries the SNF; and the 200 East Area Canister Storage Building (CSB), which stores the SNF. The purpose of this document is to describe the design basis feed compositions for materials stored or processed by SNF Project facilities and activities. This document is not intended to replace the Hanford Spent Fuel Inventory Baseline (WHC 1994b), but only to supplement it by providing more detail on the chemical and radiological inventories in the fuel (this volume) and sludge. A variety of feed definitions is required to support evaluation of specific facility and process considerations during the development of these new facilities. Six separate feed types have been identified for development of new storage or processing facilities. The approach for using each feed during design evaluations is to calculate the proposed facility flowsheet assuming each feed. The process flowsheet would then provide a basis for material compositions and quantities which are used in follow-on calculations.

  4. On-Site Wastewater Treatment Systems: Selecting and Permitting 

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2005-04-30

    This publication explains factors to consider when choosing an on-site wastewater treatment system and lists the nine steps required to obtain a permit for one. It includes addresses and phone numbers of Texas Natural Resource Conservation...

  5. Subsistence Halibut Special Permits Application Page 1 of 6

    E-Print Network [OSTI]

    (CHP) PERMIT NOTE: Attach any previously issued CHP harvest logs 1. Name of Alaska Native Tribe of Tribal Representative 5. Name of CHP Coordinator (First, Middle, Last) 6. Daytime Telephone Number 7. E

  6. Emissions Trading with Profit-Neutral Permit Allocations

    E-Print Network [OSTI]

    Hepburn, Cameron J.; Quah, John K.-H.; Ritz, Robert A.

    2012-08-17

    This paper examines the impact of an emissions trading scheme (ETS) on equilibrium emissions, output, price, market concentration, and profits in a generalized Cournot model. We develop formulae for the number of emissions permits that have...

  7. City of San Diego- Sustainable Building Expedited Permit Program

    Broader source: Energy.gov [DOE]

    In 2002, the City of San Diego passed a Resolution R-298001, which amended the Sustainable Building Policy to allow for expedited permitting for sustainable buildings. Sustainable buildings are...

  8. Hawaii Application for Surface Water Use Permit for Proposed...

    Open Energy Info (EERE)

    Hawaii Application for Surface Water Use Permit for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N) Jump to: navigation, search OpenEI Reference...

  9. Application for Presidential Permit OE Docket No. PP-396 Emera...

    Broader source: Energy.gov (indexed) [DOE]

    6 Emera Maine FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81 - April 28,...

  10. Application for Presidential Permit OE Docket No. PP-412 ITC...

    Office of Environmental Management (EM)

    Docket No. PP-412 ITC Lake Erie Connector Project Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81 - April 28, 2014...

  11. RCRA Hazardous Waste Part A Permit Application: Instructions...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23) Abstract...

  12. Hazardous Waste Facility Permit Public Comments to Community...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delete Section 5.3.7 on RACER. Provide a description of Intellus. Yes 2.0 Yes 5.1 Yes Hazardous Waste Facility Permit Public Comments to Community Relations Plan Annual Summary of...

  13. Application for presidential permit OE Docket No. PP-304 Generadora...

    Energy Savers [EERE]

    SA DE CV to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-304 Generadora Del...

  14. RRC - Supplemental Application Information for Permit to Maintain...

    Open Energy Info (EERE)

    RRC - Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit Jump to: navigation, search OpenEI Reference LibraryAdd to...

  15. Research Permit Procedure in JKT, Indonesia (June 2008)

    E-Print Network [OSTI]

    Riley, Erin P.

    Research Permit Procedure in JKT, Indonesia (June 2008) Arrive in Jakarta. Immigration stamp should Indonesia, all need to do is surrender KITAS at airport DAY 2: GO TO: (1) Polisi: pick up SKJ (ready

  16. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Application for Permit to Install Utility Facilities Within Public ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NMDOT...

  17. Taxes, Permits, and the Adoption of Abatement Technology under...

    Open Energy Info (EERE)

    the regulator does not adjust the level of the policies in response to the advent of the new technology, the extent of violations under tradable emissions permits (TEPs)- in...

  18. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    for Presidential Permit PP-400 TDI-NE - New England Clean Power Link Project - Motion to Intervene and Comments of the Vermont Department of Public Service - August 6, 2014...

  19. AZPDES General Permit for Stormwater Discharges Associated with...

    Open Energy Info (EERE)

    Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

  20. Idaho Right-of-Way Encroachment Application and Permit - Other...

    Open Energy Info (EERE)

    Idaho Right-of-Way Encroachment Application and Permit - Other Encroachments Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Right-of-Way...

  1. NMDOT Application for Permit to Construct an Access or Median...

    Open Energy Info (EERE)

    NMDOT Application for Permit to Construct an Access or Median Opening on Public Right of Way Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  2. Constraints on Neoproterozoic paleogeography and Paleozoic orogenesis from paleomagnetic records of the Bitter Springs Formation, Amadeus Basin, central Australia

    E-Print Network [OSTI]

    Swanson-Hysell, N. L; Maloof, A. C; Kirschvink, J. L; Evans, D. A. D; Halverson, G. P; Hurtgen, M. T

    2012-01-01

    carbonate rocks of the Paris Basin, France: implications forand Kodama, 2009) Paris Basin Limestones (Belkaaloul and

  3. Regulatory compliance and air quality permitting: Why do firms overcomply?

    E-Print Network [OSTI]

    DeHart-Davis, Leisha; Bozeman, Barry

    2001-10-01

    Reproduced with permission of the copyright owner. Further reproduction prohibited without permission. Regulatory compliance and air quality permitting: Why do firms overcomply? Leisha DeHart-Davis; Barry Bozeman Journal of Public Administration...Reproduced with permission of the copyright owner. Further reproduction prohibited without permission. Regulatory compliance and air quality permitting: Why do firms overcomply? Leisha DeHart-Davis; Barry Bozeman Journal of Public Administration...

  4. Plan for characterization of K Basin Spent Nuclear Fuel and sludge. Revision 1

    SciTech Connect (OSTI)

    Lawrence, L.A.

    1995-10-05

    This plan outlines a Characterization Program that provides the necessary data to support the Integrated Process Strategy scope and schedules for the Spent Nuclear Fuel (SNF) and sludge stored in the Hanford K Basins. The plan is driven by the schedule to begin fuel transfer by December 1997. The program is structured for 4 years (i.e., FY 1995 through FY 1998) and is limited to in-situ and laboratory examinations of the SNF and sludge in the K East and K West Basins. In order to assure the scope and schedule of the Characterization Program fully supports the Integrated Process Strategy, key project management has approved the plan. The intent of the program is to provide bounding behavior for the fuel, and acceptability for the transfer of the sludge to the Double Shell Tanks. Fuel examinations are based on two shipping compains from the K West Basin and one from the K East Basin with coincident sludge sampling campaings for the associated canister sludge. Sampling of the basin floor and pit sludge will be conducted independent of the fuel and canister sludge shipping activities. Fuel behavior and properties investigated in the laboratory include physical condition, hydride and oxide content, conditioning testing, oxidation kinetics, and dry storage behavior. These laboratory examinations are expected to provide the necessary data to establish or confirm fuel conditioning process limits and support safety analysis. Sludge laboratory examinations include measurement of quantity and content, measurement of properties for equipment design and recovery process limits and support safety analysis. Sludge laboratory examinations include measurement of quantity and content, measurement of properties for equipment design and recovery precesses, tank farm acceptance, simulant development, measurement of corrosion products, and measurements of drying behavior.

  5. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T. [ERM-Southwest, Inc., Houston, TX (United States)

    1995-12-31

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  6. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    SciTech Connect (OSTI)

    Olander, A.R.

    1995-03-10

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE`s treatment technology to the limit of its capability.`` Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations.

  7. PROGRESS WITH K BASINS SLUDGE RETRIEVAL STABILIZATION & PACKAGING AT THE HANFORD NUCLEAR SITE

    SciTech Connect (OSTI)

    KNOLLMEYER, P.M.; PHILLIPS, C; TOWNSON, P.S.

    2006-01-30

    This paper shows how Fluor Hanford and BNG America have combined nuclear plant skills from the U.S. and the U.K. to devise methods to retrieve and treat the sludge that has accumulated in K Basins at the Hanford Site over many years. Retrieving the sludge is the final stage in removing fuel and sludge from the basins to allow them to be decontaminated and decommissioned, so as to remove the threat of contamination of the Columbia River. A description is given of sludge retrieval using vacuum lances and specially developed nozzles and pumps into Consolidation Containers within the basins. The special attention that had to be paid to the heat generation and potential criticality issues with the irradiated uranium-containing sludge is described. The processes developed to re-mobilize the sludge from the Consolidation Containers and pump it through flexible and transportable hose-in-hose piping to the treatment facility are explained with particular note made of dealing with the abrasive nature of the sludge. The treatment facility, housed in an existing Hanford building, is described, and the uranium-corrosion and grout packaging processes explained. The uranium corrosion process is a robust, tempered process very suitable for dealing with a range of differing sludge compositions. Optimization and simplification of the original sludge corrosion process design is described and the use of transportable and reusable equipment is indicated. The processes and techniques described in the paper are shown to have wide applicability to nuclear cleanup.

  8. Independent focuses Philippines exploration on Visayan basin

    SciTech Connect (OSTI)

    Rillera, F.G.

    1995-08-21

    Cophil Exploration Corp., a Filipino public company, spearheaded 1995 Philippine oil and gas exploration activity with the start of its gas delineation drilling operations in Libertad, northern Cebu. Cophil and its Australian partners, Coplex Resources NL and PacRim Energy NL, have set out to complete a seven well onshore drilling program within this block this year. The companies are testing two modest shallow gas plays, Libertad and Dalingding, and a small oil play, Maya, all in northern Cebu about 500 km southeast of Manila. Following a short discussion on the geology and exploration history of the Visayan basin, this article briefly summarizes Cophil`s ongoing Cebu onshore drilling program. Afterwards, discussion focuses on identified exploration opportunities in the basin`s offshore sector.

  9. Independent External Evaluation of The Columbia Basin Water Transactions Program

    E-Print Network [OSTI]

    Independent External Evaluation of The Columbia Basin Water Transactions Program (2003 of Water Transactions...............................................32 Program Administration......................................................................................................45 Annex 1: Evaluation Matrix Annex 2: Limiting Factors to Water Transactions in the Columbia Basin

  10. Fossil flat-slab subduction beneath the Illinois basin, USA Heather Bedle , Suzan van der Lee

    E-Print Network [OSTI]

    van der Lee, Suzan

    .tecto.2006.06.003 #12;basin and mechanisms of basin formation, and interpret the Illinois basinFossil flat-slab subduction beneath the Illinois basin, USA Heather Bedle , Suzan van der Lee August 2006 Abstract The Illinois basin is one of several well-studied intracratonic sedimentary basins

  11. Abatement of Air Pollution: Permit to Construct and Operate Stationary Sources (Connecticut)

    Broader source: Energy.gov [DOE]

    Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements, authorized activities...

  12. Application for Presidential Permit OE Doc. No. PP-399 MATL LLP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    79, No. 93 - May 14, 2014 Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission...

  13. Application for Presidential Permit OE Docket No. PP-399 MATL LLP

    Broader source: Energy.gov [DOE]

    Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission facilities.

  14. Vermont General Permit 3-9020 for Stormwater Runoff from Construction...

    Open Energy Info (EERE)

    Vermont General Permit 3-9020 for Stormwater Runoff from Construction Sites Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit...

  15. Application for Presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

  16. Regulatory Side-by-Side Governing Permitting of Cross-Border...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Side-by-Side Governing Permitting of Cross-Border Electricity Transmission Facilities Between the United States and Canada Regulatory Side-by-Side Governing Permitting...

  17. Atlantic Mesozoic marginal basins: an Iberian view

    SciTech Connect (OSTI)

    Wilson, R.C.L.

    1987-05-01

    In the light of theoretical models for crustal stretching that precedes ocean opening, it is unlikely that Iberian basins have mirror image counterparts beneath North American or other European continental shelves. However, certain Iberian sedimentary sequences are comparable to those found in other basins. Of particular note are (1) the almost identical pre-rift sequences in all these areas, (2) the development of Upper Jurassic carbonate buildups in Portugal, Morocco, and beneath the Scotian Shelf, and (3) the hydrocarbon-bearing Upper Jurassic and Lower Cretaceous synrift and postrift siliciclastics of North America, Iberia, and Aquitaine. In the prerift sequences, Triassic red beds are capped by evaporites, which subsequently influenced the structural development of basins. Intertidal and supratidal carbonates occur at the base of the Jurassic and are overlain by Lower and Middle Jurassic limestone-shale sequences, which in places contain bituminous shales. In Portugal only, resedimented carbonates of Toarcian-Aalenian age are associated with an uplifted basement horst. In Portugal, Aquitaine, and eastern Canada, Middle Jurassic high-energy carbonate platforms developed. Synrift siliciclastic sequences show spectacular evidence for deposition within fault-bounded basins. In Portugal, lower Kimmeridgian clastics are up to 3 km thick, but Upper-Lower Cretaceous sequences are relatively thin (ca. 1 km), in contrast to those of the Basco-Cantabrian region where they exceed 10 km. In the latter region occurs the fluvially dominated Wealden (Upper Jurassic-Neocomian) and Urgonian carbonate platforms and associated basinal sediments. In the Asturias basin, Kimmeridgian shales and fluvially dominated deltaic sandstones succeed conglomeratic fluvial sandstones of uncertain age.

  18. Geographic Information System At Northern Basin & Range Region...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Northern Basin & Range Region (Blewitt, Et Al., 2003) Exploration...

  19. Columbia River Basin Research Plan Northwest Power and Conservation Council

    E-Print Network [OSTI]

    Columbia River Basin Research Plan By the Northwest Power and Conservation Council February 2006................................................................................................................. 20 (11) Human Development

  20. Tectonic & Structural Controls of Great Basin Geothermal Systems...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Characterizing Structural Controls of EGS Candidate and Conventional Geothermal Reservoirs in the Great Basin: Developing...

  1. Carbonate seismic stratigraphy of Cretaceous Paso Caballos basin, Guatemala: new structures in a structureless basin

    SciTech Connect (OSTI)

    Pigott, J.D.; Mazariegos, R.; Forgotson, J.M. Jr.

    1989-03-01

    Previous exploration in the carbonate and evaporite sequences of the Paso Caballos basin focused primarily upon structural plays. Early data acquisition and processing purposely excluded the resolution advantages of broad frequency ranges and ignored the problems of statics. Interpretations based on these data were predictably unsuccessful in this large, presently karsted, Cretaceous shallow marine platform. Seismic stratigraphic analysis of 735.5 km of statics-corrected, broad-band, zero-phase dynamic and Vibroseis data acquired in 1981 and 1982 delineates four seismic sequences within the Cretaceous (in increasing age): The Lacandon-Barton Creek limestone sequence, the upper Coban salt sequence, the middle Coban dolomitic salt sequence, and the Lower Cretaceous dolomitic sequence. The sequences overlying the faulted and folded Lower Cretaceous dolomitic sequence are relatively smooth and dip at a low angle toward a depocenter to the northwest. Within the carbonate section of the upper Coban salt sequence are several large (45 km/sup 2/), mounded structures with substantial lateral and vertical variations in both reflection group configurations and wavelet characteristics. Detailed modeling and attribute analysis offer additional insight into the interpretation of these structures. For example, analysis of one such feature, the Santa Amelia structure, shows notched frequency attenuation off structure, which suggests permeable hydrocarbon-filled porosities on the flank isolated and sealed from a wet structural center.

  2. Simplified vibratory characterization of alluvial basins

    E-Print Network [OSTI]

    Semblat, Jean-François; Duval, Anne-Marie

    2011-01-01

    For the analysis of seismic wave amplification, modal methods are interesting tools to study the modal properties of geological structures. Modal approaches mainly lead to information on such parameters as fundamental frequencies and eigenmodes of alluvial basins. For a specific alluvial deposit in Nice (France), a simplified modal approach involving the Rayleigh method is considered. This approach assumes a set of admissible shape functions for the eigenmodes and allows a fast estimation of the fundamental frequency of the basin. The agreement between modal numerical results and experimental ones is satisfactory. The simplified modal method then appears as an efficient mean for the global vibratory characterization of geological structures towards resonance.

  3. Atlas of major Appalachian basin gas plays

    SciTech Connect (OSTI)

    Aminian, K.; Avary, K.L.; Baranoski, M.T.; Flaherty, K.; Humphreys, M.; Smosna, R.A.

    1995-06-01

    This regional study of gas reservoirs in the Appalachian basin has four main objectives: to organize all of the -as reservoirs in the Appalachian basin into unique plays based on common age, lithology, trap type and other geologic similarities; to write, illustrate and publish an atlas of major gas plays; to prepare and submit a digital data base of geologic, engineering and reservoir parameters for each gas field; and technology transfer to the oil and gas industry during the preparation of the atlas and data base.

  4. West Basin Municipal Water District, California; Water/Sewer

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Exhibit D #12;Summary: West Basin Municipal Water District, California; Water/Sewer Primary Credi90023!! #12;Sttmma1·y: West Basin Municipal Water District, California; Water/Sewer Credit Profile US$16.STANDARDANDPOORS.COM/RATJNGSDJRECT MAY31 2013 2 I126639 I 301008236 #12;Summary: West Basin Municipal Water District, California; Water/Sewer

  5. Part One: Overview I. The Columbia River Basin

    E-Print Network [OSTI]

    included the construction of dams throughout the basin for such purposes as hydroelectric power, flood tributaries comprise one of the most intensively developed river basins for hydroelectric power in the world. Hydroelectric dams in the basin (Links marked are external, not part of the adopted Program) 7 #12;produce

  6. POLLUTION IN THE LOWER COLUMBIA BASIN IN 1948-

    E-Print Network [OSTI]

    POLLUTION IN THE LOWER COLUMBIA BASIN IN 1948- With particular reference to the Willamette River, intended to aid or direct management or utilization praotices and as gi.\\ides for administrative POLLUTION IN THE LOTOR COLIMRIA BASIN IN 1948 WITH PARTI CirW.R REFERENCE TO THE WTLLAJTETTE BASIN

  7. NE Pacific Basin --Tagging Data Kate Myers, Ph.D.

    E-Print Network [OSTI]

    Ocean B: NE Pacific Basin --Tagging Data Kate Myers, Ph.D. Principal Investigator, High Seas Salmon ocean tagging research on Columbia River salmon and steelhead migrating in the NE Pacific Basin R. Basin in 1995-2004. Fisheries and Oceans Canada, Pacific Biological Station, Nanaimo, B

  8. Carbon Dioxide Capture and Transportation Options in the Illinois Basin

    SciTech Connect (OSTI)

    M. Rostam-Abadi; S. S. Chen; Y. Lu

    2004-09-30

    This report describes carbon dioxide (CO{sub 2}) capture options from large stationary emission sources in the Illinois Basin, primarily focusing on coal-fired utility power plants. The CO{sub 2} emissions data were collected for utility power plants and industrial facilities over most of Illinois, southwestern Indiana, and western Kentucky. Coal-fired power plants are by far the largest CO{sub 2} emission sources in the Illinois Basin. The data revealed that sources within the Illinois Basin emit about 276 million tonnes of CO2 annually from 122 utility power plants and industrial facilities. Industrial facilities include 48 emission sources and contribute about 10% of total emissions. A process analysis study was conducted to review the suitability of various CO{sub 2} capture technologies for large stationary sources. The advantages and disadvantages of each class of technology were investigated. Based on these analyses, a suitable CO{sub 2} capture technology was assigned to each type of emission source in the Illinois Basin. Techno-economic studies were then conducted to evaluate the energy and economic performances of three coal-based power generation plants with CO{sub 2} capture facilities. The three plants considered were (1) pulverized coal (PC) + post combustion chemical absorption (monoethanolamine, or MEA), (2) integrated gasification combined cycle (IGCC) + pre-combustion physical absorption (Selexol), and (3) oxygen-enriched coal combustion plants. A conventional PC power plant without CO2 capture was also investigated as a baseline plant for comparison. Gross capacities of 266, 533, and 1,054 MW were investigated at each power plant. The economic study considered the burning of both Illinois No. 6 coal and Powder River Basin (PRB) coal. The cost estimation included the cost for compressing the CO{sub 2} stream to pipeline pressure. A process simulation software, CHEMCAD, was employed to perform steady-state simulations of power generation systems and CO{sub 2} capture processes. Financial models were developed to estimate the capital cost, operations and maintenance cost, cost of electricity, and CO{sub 2} avoidance cost. Results showed that, depending on the plant size and the type of coal burned, CO{sub 2} avoidance cost is between $47/t to $67/t for a PC +MEA plant, between $22.03/t to $32.05/t for an oxygen combustion plant, and between $13.58/t to $26.78/t for an IGCC + Selexol plant. A sensitivity analysis was conducted to evaluate the impact on the CO2 avoidance cost of the heat of absorption of solvent in an MEA plant and energy consumption of the ASU in an oxy-coal combustion plant. An economic analysis of CO{sub 2} capture from an ethanol plant was also conducted. The cost of CO{sub 2} capture from an ethanol plant with a production capacity of 100 million gallons/year was estimated to be about $13.92/t.

  9. BASIN ANALYSIS AND PETROLEUM SYSTEM CHARACTERIZATION AND MODELING, INTERIOR SALT BASINS, CENTRAL AND EASTERN GULF OF MEXICO

    SciTech Connect (OSTI)

    Ernest A. Mancini; Donald A. Goddard

    2005-08-01

    The principal research effort for Year 3 of the project is basin modeling and petroleum system identification, comparative basin evaluation and resource assessment. In the first six (6) months of Year 3, the research focus is on basin modeling and petroleum system identification and the remainder of the year the emphasis is on the comparative basin evaluation and resource assessment. No major problems have been encountered to date, and the project is on schedule.

  10. The second Pacific basin biofuels workshop: Volume 1, Report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    Biomass is the most flexible renewable energy resource in Hawaii. Today it provides the state with cost-effective fuel for electrical generation and for thermal energy used in sugarcane processing; tomorrow it will provide feedstock to produce liquid and gaseous fuels, which will help meet Hawaii's transportation energy needs. With optimal growing conditions year round and a strong economy based in part on sugarcane and pineapple cultivation, Hawaii is an ideal place to develop fuels from biomass. In November 1984, the Hawaii Natural Energy Institute (HNEI) held the First Pacific Basin BioFuels Workshop. The Plan for Action resulting from this workshop led to significant new program efforts that addressed the advancement of biomass research, development, and use. The Second Pacific Basin BioFuels Workshop was held at the Kauai Resort Hotel in Kapaa, Kauai, April 22-24, 1987. Before and after the workshop, HNEI conducted field visits to biomass energy facilities and test sites on Hawaii, Maui, Oahu, and Kauai. The workshop consisted of presentations, discussion groups, and plenary sessions on growth and yield, conversion, end use, institutional issues, and other topics. The final session focused on recommendations for a Plan for Action update.

  11. Evolution of extensional basins and basin and range topography west of Death Valley, California

    E-Print Network [OSTI]

    Hodges, K. V.; McKenna, L. W.; Stock, J.; Knapp, J.; Page, L.; Sternlof, K.; Silverberg, D.; Wust, G.; Walker, J. Douglas

    1989-06-01

    complex in late Miocene (?) – early Pliocene time. The principal growth structure for the basin was the Emigrant detachment, which initiated and moved at a low angle. Modern Panamint Valley, west of the range, developed as a consequence of Late Pliocene...

  12. 8 River Basin Closure and Institutional Change in Mexico's LermaChapala Basin

    E-Print Network [OSTI]

    Scott, Christopher

    for irrigation expansion, and the drilling of new wells and the construction of new dams has been prohibited-exploitation, and influenced by the vested interests of the hydraulic ©CAB International 2005. Irrigation and River Basin

  13. Lower crustal ow and the role of shear in basin subsidence: an example from the Dead Sea basin

    E-Print Network [OSTI]

    ten Brink, Uri S.

    Lower crustal £ow and the role of shear in basin subsidence: an example from the Dead Sea basin, MA 02543, USA Abstract We interpret large-scale subsidence (5^6 km depth) with little attendant that lower crustal flow would occur within the time frame of basin subsidence if the viscosity is 9 7U1019 ^1

  14. Columbia Basin Data Center The development of a Columbia Basin Data Center will provide extensive benefits for the

    E-Print Network [OSTI]

    Columbia Basin Data Center 4/24/06 The Vision The development of a Columbia Basin Data Center, with the working title of the Columbia Basin Data Center would be charged with ensuring that important data. The Data Center would not be responsible for collecting and compiling data. That function would remain

  15. BLUE RIVER BASIN (Dodson Industrial District)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    BLUE RIVER BASIN (Dodson Industrial District) Kansas City, Missouri MODIFICATION REQUEST capability to support this request. PROJECT PURPOSE Dodson Industrial District is located along the Blue of a 6,800 foot long levee- floodwall along the north bank of the Blue River from the Bannister Road

  16. TURKEY CREEK BASIN Kansas and Missouri

    E-Print Network [OSTI]

    US Army Corps of Engineers

    TURKEY CREEK BASIN Kansas and Missouri MODIFICATION REQUEST Modification to the authorized total the Turkey Creek channel and runoff from the adjacent hillsides, and the current depth of flooding along in the past decade. Additionally, the Turkey Creek tunnel constructed in 1919 to divert the channel away from

  17. Fast Facts About the Columbia River Basin

    E-Print Network [OSTI]

    cost and availability, and the effect of the hydropower system on fish and wildlife. columbia River, and fish and wildlife affected by, the columbia River Basin hydropower dams. the council is a unique of the Council under the Act are to: 1. Develop a regional power plan to assure the Northwest an adequate

  18. Geological Modeling of Dahomey and Liberian Basins 

    E-Print Network [OSTI]

    Gbadamosi, Hakeem B.

    2010-01-16

    in the last 10 years or so. We proposed geological descriptions of these two Basins. The key characteristics of the two models are the presence of channels and pinch-outs for depths of between 1 km and 2 km (these values are rescaled for our numerical purposes...

  19. Okanogan Basin Spring Spawner Report for 2007.

    SciTech Connect (OSTI)

    Colville Tribes, Department of Fish & Wildlife

    2007-09-01

    The Okanogan Basin Monitoring and Evaluation Program collected data related to spring spawning anadromous salmonid stocks across the entire Okanogan River basin. Data were collected using redd surveys, traps, underwater video, and PIT-tag technology then summarized and analyzed using simple estimate models. From these efforts we estimated that 1,266 summer steelhead spawned in the Okanogan River basin and constructed 552 redds;152 of these fish where of natural origin. Of these, 121 summer steelhead, including 29 of natural origin, created an estimated 70 redds in the Canadian portion of the Okanagan basin. We estimated summer steelhead spawner escapement into each sub-watershed along with the number from natural origin and the number and density of redds. We documented redd desiccation in Loup Loup Creek, habitat utilization in Salmon Creek as a result of a new water lease program, and 10 spring Chinook returning to Omak Creek. High water through most of the redd survey period resulted in development of new modeling techniques and allowed us to survey additional tributaries including the observation of summer steelhead spawning in Wanacut Creek. These 2007 data provide additional support that redd surveys conducted within the United States are well founded and provide essential information for tracking the recovery of listed summer steelhead. Conversely, redd surveys do not appear to be the best approach for enumerating steelhead spawners or there distribution within Canada. We also identified that spawning distributions within the Okanogan River basin vary widely and stocking location may play an over riding roll in this variability.

  20. Hanford facility dangerous waste permit application, general information portion

    SciTech Connect (OSTI)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

  1. Air Pollution Control Regulations: No. 9- Air Pollution Control Permits (Rhode Island)

    Broader source: Energy.gov [DOE]

    These regulations describe permitting procedures and requirements for minor and major sources of emissions.

  2. File:08-CA-f - Permit to Construct.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermitORDExpeditedPlantCommissioningProcess.pdf Jump8 -Information 8-CA-b8-CA-f -

  3. Thickness of proximal ejecta from the Orientale Basin from Lunar Orbiter Laser Altimeter (LOLA) data: Implications for multi-ring basin formation

    E-Print Network [OSTI]

    Fassett, Caleb I.

    Quantifying the ejecta distribution around large lunar basins is important to understanding the origin of basin rings, the volume of the transient cavity, the depth of sampling, and the nature of the basin formation ...

  4. How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year

    E-Print Network [OSTI]

    Goda, Keisuke

    How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year 15,000 yen the permit on the fender of your bike where it can be seen easily. Application Procedures Bicycle Permit Motorcycle Permit Bicycle Permit Motorcycle Permit Dai-ni Koubaibu Store: Weekdays 10 00 19 00 Nougakubu

  5. File:06CAATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, searchInformation6CAATransportationPermit.pdf

  6. File:06IDATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History View06IDATransportationPermit.pdf

  7. File:06IDCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History6IDCDrinkingWaterPermit.pdf Jump to:

  8. File:06NVATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source6MTEFloodplainDevelopmentPermit

  9. File:06NVCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump to: navigation, search File

  10. File:06ORATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump to: navigation, search

  11. File:06ORCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump to:

  12. File:06UTBStormWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf6UTATransportation.pdf Jump

  13. File:06UTCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf6UTATransportation.pdf

  14. File:Permit packet s-8.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdfgaspOregonSHPOClearanceForm.pdf JumpPermitPermit packet

  15. File:Permit2012.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdfgaspOregonSHPOClearanceForm.pdf JumpPermitPermit

  16. Presidential Permit Holders - Annual Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS -Portmouth2015DepartmentPresidential permit

  17. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 - Applications JumpPermits |RegulationsWater Permit

  18. Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    Bloomquist, R.Gordon

    1991-10-01

    The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

  19. A Coupled Modeling System to Simulate Water Resources in the Rio Grande Basin

    SciTech Connect (OSTI)

    Bossert, J.E.; Breshears, D.D.; Campbell, K.; Costigan, K.R.; Greene, R.K.; Keating, E.H.; Kleifgen, L.M.; Langley, D.L.; Martens, S.N.; Sanderson, J.G.; Springer, E.P.; Stalker, J.R.; Tartakovsky, D.M.; Winter, C.L.; Zyvoloski, G.A.

    1999-01-11

    Limited availability of fresh water in arid and semi-arid regions of the world requires prudent management strategies from accurate, science-based assessments. These assessments demand a thorough understanding of the hydrologic cycle over long time periods within the individual water-sheds that comprise large river basins. Measurement and simulation of the hydrologic cycle is a tremendous challenge, involving a coupling between global to regional-scale atmospheric precipitation processes with regional to local-scale land surface and subsurface water transport. Los Alamos National Laboratory is developing a detailed modeling system of the hydrologic cycle and applying this tool at high resolution to assess the water balance within the upper Rio Grande river basin. The Rio Grande is a prime example of a river system in a semiarid environment, with a high demand from agricultural, industrial, recreational, and municipal interests for its water supply. Within this river basin, groundwater supplies often augment surface water. With increasing growth projected throughout the river basin, however, these multiple water users have the potential to significantly deplete groundwater resources, thereby increasing the dependence on surface water resources.

  20. Characterization of bedded salt for storage caverns -- A case study from the Midland Basin, Texas

    SciTech Connect (OSTI)

    Hovorka, Susan D.; Nava, Robin

    2000-06-13

    The geometry of Permian bedding salt in the Midland Basin is a product of interaction between depositional facies and postdepositional modification by salt dissolution. Mapping high-frequency cycle patterns in cross section and map view using wireline logs documents the salt geometry. Geologically based interpretation of depositional and dissolution processes provides a powerful tool for mapping and geometry of salt to assess the suitability of sites for development of solution-mined storage caverns. In addition, this process-based description of salt geometry complements existing data about the evolution of one of the best-known sedimentary basins in the world, and can serve as a genetic model to assist in interpreting other salts.

  1. 2007 Nationwide Permits, Conditions, Further Information, and Definitions (with corrections)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Discharges 19. Minor Dredging 20. Oil Spill Cleanup 21. Surface Coal Mining Operations 22. Removal of Vessels Aquaculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities Nationwide Permit. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. Pipeline

  2. FEDERAL PERMIT APPLICATION FOR VESSELS FISHING FOR WRECKFISH

    E-Print Network [OSTI]

    1 FEDERAL PERMIT APPLICATION FOR VESSELS FISHING FOR WRECKFISH OFF THE SOUTH ATLANTIC STATES OMB can you bring to the dock when full? USCG DOCUMENTED VESSELS ONLY Gross Tons Net Tons Hull Material) United States Coast Guard (USCG) Certificate of Documentation or a copy of the State Vessel Registration

  3. Deliverable 2: Report on Final Design and Permitting

    E-Print Network [OSTI]

    Deliverable 2: Report on Final Design and Permitting Crissy Field Center Wind Power Study HNEI Field Center Wind Power Study December 2, 2012 Deliverable 2 Background Per the terms of the project, and power generation for each wind energy system. Data from the DAS shall be made available to HNEI

  4. Guidance manual for hazardous waste incinerator permits. Final report

    SciTech Connect (OSTI)

    Not Available

    1983-07-01

    The manual provides guidance to the permit writer for designating facility - specific operating conditions necessary to comply with the RCRA standards for hazardous waste incinerators. Each section of the incineration regulation is addressed, including: waste analysis, designation of principal organic hazardous constituents and requirements for operation, inspection and monitoring. Guidance is also provided for evaluating incinerator performance data and trial burn procedures.

  5. The Initial Allocation of Carbon Permits: Choices and Implications

    E-Print Network [OSTI]

    -enforced cartel to restrict quantity, in order to raise price. Quantity of coal-fired electricity Price Marginal" for electricity is a "demand for pollution." Restricted number of permits #12;Four Important Goals for Use. ­ If not use auction revenue to reduce marginal tax rates, then higher energy/goods prices mean lower real net

  6. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  7. Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

    SciTech Connect (OSTI)

    Young, K. R.; Levine, A.

    2014-09-01

    The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

  8. Wave Energy Development in Oregon Licensing & Permitting Requirements

    E-Print Network [OSTI]

    July 09 Wave Energy Development in Oregon Licensing & Permitting Requirements Prepared by Pacific Energy Ventures on behalf of the Oregon Wave Energy Trust w w w . o r e g o n w a v e . o r g #12;This study was commissioned by Oregon Wave Energy Trust. Oregon Wave Energy Trust is funded by the Oregon

  9. Geophys. J. Int. (1999) 139, 248260 The thermal evolution of sedimentary basins and its effect on the

    E-Print Network [OSTI]

    1999-01-01

    applied to borehole samples of actual source rocks. In contrast, the steady-state geotherm models give geothermal gradient (temperature); and duration of sedimentation (time). The standard approach to modelling this process assumes an evolving burial history, but in a basin with a steady-state geotherm, both

  10. Caribbean basin framework, 2: Northern Central America

    SciTech Connect (OSTI)

    Tyburski, S.A.; Gordon, M.B.; Mann, P. (Univ. of Texas, Austin (United States))

    1991-03-01

    There are four Jurassic to Recent basin-forming periods in northern Central America (honduras, Honduran Borderlands, Belize, Guatemala, northern Nicaragua): (1) Middle Jurassic-Early Cretaceous rifting and subsidence along normal faults in Honduras and Guatemala; rifts are suggested but are not well defined in Honduras by the distribution of clastic sediments and associated volcanic rocks. Rifting is attributed to the separation of Central America from the southern margin of the North American plate; (2) Cretaceous subsidence recorded by the development of a Cretaceous carbonate platform in Honduras, Guatemala, and Belize; subsidence is attributed to thermal subsidence of the rifted margins of the various blocks; (3) Late Cretaceous-Recent development of a volcanic arc along the western margin of Middle America and the northern margin of Honduras; (4) Late Cretaceous large-scale folding in Honduras, ophiolite obduction, and formation of a foredeep basin in Guatemala (Sepur trough); deformation is attributed to the collision between a north-facing arc in northern Honduras and the Nicaraguan Rise and the passive margin of Guatemala and Belize; and (5) Eocene to Recent strike-slip faulting along the present-day North American-Caribbean plate boundary in Guatemala, northern Honduras, and Belize. Strike-slip faults and basins form a California-type borderlands characterized by elongate basins that appear as half-grabens in profile. Counterclockwise rotation of the central honduras plateau, a thicker and topographically higher-than-average block within the plate boundary zone, is accommodated by rifting or strike-slip faults at its edges.

  11. San Juan Basin EC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onRAPID/Geothermal/Exploration/ColoradoRemsenburg-Speonk,Sage Resources JumpDimas, California:County,Basin EC Jump to:

  12. ADVANCED CHARACTERIZATION OF FRACTURED RESERVOIRS IN CARBONATE ROCKS: THE MICHIGAN BASIN

    SciTech Connect (OSTI)

    James R. Wood; William B. Harrison

    2002-12-01

    The purpose of the study was to collect and analyze existing data on the Michigan Basin for fracture patterns on scales ranging form thin section to basin. The data acquisition phase has been successfully concluded with the compilation of several large digital databases containing nearly all the existing information on formation tops, lithology and hydrocarbon production over the entire Michigan Basin. These databases represent the cumulative result of over 80 years of drilling and exploration. Plotting and examination of these data show that contrary to most depictions, the Michigan Basin is in fact extensively faulted and fractured, particularly in the central portion of the basin. This is in contrast to most of the existing work on the Michigan Basin, which tends to show relatively simple structure with few or minor faults. It also appears that these fractures and faults control the Paleozoic sediment deposition, the subsequent hydrocarbon traps and very likely the regional dolomitization patterns. Recent work has revealed that a detailed fracture pattern exists in the interior of the Central Michigan Basin, which is related to the mid-continent gravity high. The inference is that early Precambrian, ({approx}1 Ga) rifting events presumed by many to account for the gravity anomaly subsequently controlled Paleozoic sedimentation and later hydrocarbon accumulation. There is a systematic relationship between the faults and a number of gas and oil reservoirs: major hydrocarbon accumulations consistently occur in small anticlines on the upthrown side of the faults. The main tools used in this study to map the fault/fracture patterns are detailed, close-interval (CI = 10 feet) contouring of the formation top picks accompanied by a new way of visualizing the data using a special color spectrum to bring out the third dimension. In addition, recent improvements in visualization and contouring software were instrumental in the study. Dolomitization is common in the Michigan Basin, and it is crucial in developing reservoir quality rocks in some fields. Data on the occurrence of dolomite was extracted from driller's reports for all reported occurrences in Michigan, nearly 50 fields and over 500 wells. A digital database was developed containing the geographic location of all these wells (latitude-longitude) as well as the elevation of the first encounter of dolomite in the field/reservoir. Analysis shows that these dolomite occurrences are largely confined to the center of the basin, but with some exceptions, such as N. Adams Field. Further, some of the dolomite occurrences show a definite relationship to the fracture pattern described above, suggesting a genetic relationship that needs further work. Other accomplishments of this past reporting period include obtaining a complete land grid for the State of Michigan and further processing of the high and medium resolution DEM files. We also have measured new fluid inclusion data on dolomites from several fields that suggest that the dolomitization occurred at temperatures between 100 and 150 C. Finally, we have extracted the lithologic data for about 5000 wells and are in the process of integrating this data into the overall model for the Michigan Basin.

  13. Hydrocarbon habitat of the west Netherlands basin

    SciTech Connect (OSTI)

    De Jager, J. (Nederlandse Aardolie Maatschappij, Assen (Netherlands)); Doyle, M. (Petroleum Development Oman, Muscat (Oman)); Grantham, P. (KSEPL/Shell Research, Rijswijk (Netherlands)); Mabillard, J. (Shell Nigeria, Port Harcourt (Nigeria))

    1993-09-01

    The complex West Netherlands Basin contains oil and gas in Triassic and Upper Jurassic to Cretaceous clastic reservoir sequences. The understanding has always been that the Carboniferous coal measures have generated only gas and the Jurassic marine Posidonia Shale only oil. However, detailed geochemical analyses show that both source rocks have generated oil and gas. Geochemical fingerprinting established a correlation of the hydrocarbons with the main source rocks. The occurrence of these different hydrocarbons is consistent with migration routes. Map-based charge modeling shows that the main phase of hydrocarbon generation occurred prior to the Late Cretaceous inversion of the West Netherlands Basin. However, along the southwest flank of the basin and in lows between the inversion highs, significant charge continued during the Tertiary. Biodegradation of oils in Jurassic and Cretaceous reservoirs occurred during the earliest Tertiary, but only in reservoirs that were at that time at temperatures of less then 70 to 80[degrees]C, where bacteria could survive. This study shows that also in a mature hydrocarbon province an integrated hydrocarbon habitat study with modern analyses and state-of-the-art technology can lead to a much improved understanding of the distribution of oil and gas in the subsurface. The results of this study will allow a better risk assessment for remaining prospects, and an improved prediction of the type of trapped hydrocarbons in terms of gas, oil, and biodegraded oil.

  14. Characterization of the surface properties of Illinois Basin coals. Technical report, December 1, 1991--February 29, 1992

    SciTech Connect (OSTI)

    Demir, I.; Harvey, R.D.; Lizzio, A.A.

    1992-08-01

    Understanding the surface properties of coal is important for predicting the physical-chemical behavior of coal during coal cleaning combustion and conversion. Data on surface properties help coal scientists and engineers in the design of effective coal desulfurization processes, and thereby aid in the marketability of Illinois Basin coals. The main objective of this project is to characterize the surface properties (surface area, porosity, pore size distribution, surface charge, and surface chemical structure) of eight coals in the Illinois Basin Coal Sample Program (IBCSP), and explore statistical relationships between surface properties and other coal characteristics.

  15. STP K Basin Sludge Sample Archive at the Pacific Northwest National Laboratory FY2014

    SciTech Connect (OSTI)

    Fiskum, Sandra K.; Smoot, Margaret R.; Schmidt, Andrew J.

    2014-06-01

    The Pacific Northwest National Laboratory (PNNL) currently houses 88 samples (~10.5 kg) of K Basin sludge (81 wet and seven dry samples) on behalf of the Sludge Treatment Project (STP), which is managed for the U.S. Department of Energy (DOE) by the CH2M Hill Plateau Remediation Company (CHPRC). Selected samples are intended to serve, in part, as sentinels to enhance understanding of sludge properties after long-term storage, and thus enhance understanding of sludge behavior following transfer to sludge transfer and storage containers (STSCs) and storage at the Hanford 200 Area central plateau. In addition, remaining samples serve in contingency for future testing requirements. At PNNL, the samples are tracked and maintained under a prescriptive and disciplined monthly sample-monitoring program implemented by PNNL staff. This report updates the status of the K Basin archive sludge sample inventory to April 2014. The previous inventory status report, PNNL 22245 (Fiskum et al. 2013, limited distribution report), was issued in February of 2013. This update incorporates changes in the inventory related to repackaging of 17 samples under test instructions 52578 TI052, K Basin Sludge Sample Repackaging for Continued Long Term Storage, and 52578 TI053, K Basin Sludge Sample Repackaging Post-2014 Shear Strength Measurements. Note that shear strength measurement results acquired in 2014 are provided separately. Specifically, this report provides the following: • a description of the K Basin sludge sample archive program and the sample inventory • a summary and images of the samples that were repackaged in April 2014 • up-to-date images and plots of the settled density and water loss from all applicable samples in the inventory • updated sample pedigree charts, which provide a roadmap of the genesis and processing history of each sample in the inventory • occurrence and deficiency reports associated with sample storage and repackaging

  16. Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

    SciTech Connect (OSTI)

    2008-03-26

    This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework

  17. K basins interim remedial action health and safety plan

    SciTech Connect (OSTI)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  18. NATURAL GAS RESOURCES IN DEEP SEDIMENTARY BASINS

    SciTech Connect (OSTI)

    Thaddeus S. Dyman; Troy Cook; Robert A. Crovelli; Allison A. Henry; Timothy C. Hester; Ronald C. Johnson; Michael D. Lewan; Vito F. Nuccio; James W. Schmoker; Dennis B. Riggin; Christopher J. Schenk

    2002-02-05

    From a geological perspective, deep natural gas resources are generally defined as resources occurring in reservoirs at or below 15,000 feet, whereas ultra-deep gas occurs below 25,000 feet. From an operational point of view, ''deep'' is often thought of in a relative sense based on the geologic and engineering knowledge of gas (and oil) resources in a particular area. Deep gas can be found in either conventionally-trapped or unconventional basin-center accumulations that are essentially large single fields having spatial dimensions often exceeding those of conventional fields. Exploration for deep conventional and unconventional basin-center natural gas resources deserves special attention because these resources are widespread and occur in diverse geologic environments. In 1995, the U.S. Geological Survey estimated that 939 TCF of technically recoverable natural gas remained to be discovered or was part of reserve appreciation from known fields in the onshore areas and State waters of the United. Of this USGS resource, nearly 114 trillion cubic feet (Tcf) of technically-recoverable gas remains to be discovered from deep sedimentary basins. Worldwide estimates of deep gas are also high. The U.S. Geological Survey World Petroleum Assessment 2000 Project recently estimated a world mean undiscovered conventional gas resource outside the U.S. of 844 Tcf below 4.5 km (about 15,000 feet). Less is known about the origins of deep gas than about the origins of gas at shallower depths because fewer wells have been drilled into the deeper portions of many basins. Some of the many factors contributing to the origin of deep gas include the thermal stability of methane, the role of water and non-hydrocarbon gases in natural gas generation, porosity loss with increasing thermal maturity, the kinetics of deep gas generation, thermal cracking of oil to gas, and source rock potential based on thermal maturity and kerogen type. Recent experimental simulations using laboratory pyrolysis methods have provided much information on the origins of deep gas. Technologic problems are one of the greatest challenges to deep drilling. Problems associated with overcoming hostile drilling environments (e.g. high temperatures and pressures, and acid gases such as CO{sub 2} and H{sub 2}S) for successful well completion, present the greatest obstacles to drilling, evaluating, and developing deep gas fields. Even though the overall success ratio for deep wells is about 50 percent, a lack of geological and geophysical information such as reservoir quality, trap development, and gas composition continues to be a major barrier to deep gas exploration. Results of recent finding-cost studies by depth interval for the onshore U.S. indicate that, on average, deep wells cost nearly 10 times more to drill than shallow wells, but well costs and gas recoveries vary widely among different gas plays in different basins. Based on an analysis of natural gas assessments, many topical areas hold significant promise for future exploration and development. One such area involves re-evaluating and assessing hypothetical unconventional basin-center gas plays. Poorly-understood basin-center gas plays could contain significant deep undiscovered technically-recoverable gas resources.

  19. Geographic Information System At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Nash & Johnson, 2003) Exploration Activity Details Location Northern Basin and Range Geothermal Region Exploration Technique Geographic Information System Activity Date Usefulness...

  20. Geographic Information System At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Location Northern Basin and Range Geothermal Region Exploration Technique Geographic Information System Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown...

  1. Thermal Gradient Holes At Northern Basin & Range Region (Pritchett...

    Open Energy Info (EERE)

    Thermal Gradient Holes At Northern Basin & Range Region (Pritchett, 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Thermal Gradient Holes...

  2. COAL QUALITY AND GEOCHEMISTRY, POWDER RIVER BASIN, WYOMING AND MONTANA

    E-Print Network [OSTI]

    in the Powder River Basin in Wyoming and Montana (fig. PQ-1) is considered to be "clean coal." For the location

  3. Targeting Of Potential Geothermal Resources In The Great Basin...

    Open Energy Info (EERE)

    From Regional To Basin-Scale Relationship Between Geodetic Strain And Geological Structures Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper:...

  4. Geographic Information System At Northern Basin & Range Region...

    Open Energy Info (EERE)

    for Geothermal Systems in The Great Basin Using a Geographic Information System (GIS) - Part II, Coolbaugh, Zehner, Raines, Shevenell, Minor, Sawatzky and Oppliger. The...

  5. Variable Crustal Thickness In The Western Great Basin- A Compilation...

    Open Energy Info (EERE)

    php?titleVariableCrustalThicknessInTheWesternGreatBasin-ACompilationOfOldAndNewRefractionData&oldid793047" Categories: Missing Required Information Reference...

  6. Refraction Survey At Northern Basin & Range Region (Heimgartner...

    Open Energy Info (EERE)

    Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Northern Basin & Range Region (Heimgartner, Et Al., 2005)...

  7. Data Acquisition-Manipulation At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Data Acquisition-Manipulation At Northern Basin & Range Region (Coolbaugh, Et Al., 2005 - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data...

  8. Geographic Information System At Nw Basin & Range Region (Nash...

    Open Energy Info (EERE)

    Geographic Information System At Nw Basin & Range Region (Nash & Johnson, 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic...

  9. Modeling-Computer Simulations At Nw Basin & Range Region (Pritchett...

    Open Energy Info (EERE)

    Modeling-Computer Simulations At Nw Basin & Range Region (Pritchett, 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer...

  10. Data Acquisition-Manipulation At Nw Basin & Range Region (Coolbaugh...

    Open Energy Info (EERE)

    Data Acquisition-Manipulation At Nw Basin & Range Region (Coolbaugh, Et Al., 2005 - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data...

  11. Compound and Elemental Analysis At Nw Basin & Range Region (Coolbaugh...

    Open Energy Info (EERE)

    Compound and Elemental Analysis At Nw Basin & Range Region (Coolbaugh, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and...

  12. Geographic Information System At Nw Basin & Range Region (Coolbaugh...

    Open Energy Info (EERE)

    Geographic Information System At Nw Basin & Range Region (Coolbaugh, Et Al., 2005 - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic...

  13. Geothermometry At Nw Basin & Range Region (Shevenell & De Rocher...

    Open Energy Info (EERE)

    Geothermometry At Nw Basin & Range Region (Shevenell & De Rocher, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Nw...

  14. Trace Element Analysis At Nw Basin & Range Region (Coolbaugh...

    Open Energy Info (EERE)

    Trace Element Analysis At Nw Basin & Range Region (Coolbaugh, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Trace Element...

  15. Modeling-Computer Simulations At Nw Basin & Range Region (Biasi...

    Open Energy Info (EERE)

    Modeling-Computer Simulations At Nw Basin & Range Region (Biasi, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer...

  16. Geographic Information System At Nw Basin & Range Region (Blewitt...

    Open Energy Info (EERE)

    Geographic Information System At Nw Basin & Range Region (Blewitt, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic...

  17. Data Acquisition-Manipulation At Northern Basin & Range Region...

    Open Energy Info (EERE)

    References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard Smith, Jason McKenna (2003) Geothermal Resource Analysis And Structure Of Basin And Range...

  18. Data Acquisition-Manipulation At Nw Basin & Range Region (Blackwell...

    Open Energy Info (EERE)

    References D. D. Blackwell, K. W. Wisian, M. C. Richards, Mark Leidig, Richard Smith, Jason McKenna (2003) Geothermal Resource Analysis And Structure Of Basin And Range...

  19. Paleoecology and Paleobiogeography of the New York Appalachian Basin Eurypterids

    E-Print Network [OSTI]

    Paleoecology and Paleobiogeography of the New York Appalachian Basin Eurypterids Kimberly Lau resulted in a better understanding of the paleoecology and paleobiogeography of a poorly studied group

  20. Direct-Current Resistivity Survey At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Direct-Current Resistivity Survey At Northern Basin & Range Region (Pritchett, 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

  1. Direct-Current Resistivity Survey At Nw Basin & Range Region...

    Open Energy Info (EERE)

    Direct-Current Resistivity Survey At Nw Basin & Range Region (Pritchett, 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Direct-Current...

  2. Geothermal Reservoir Assessment Case Study, Northern Basin and...

    Open Energy Info (EERE)

    Assessment Case Study, Northern Basin and Range Province, Northern Dixie Valley, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal...

  3. Abraham Hot Springs Geothermal Area Northern Basin and Range...

    Open Energy Info (EERE)

    Basin and Range Geothermal Region Medical Hot Springs Geothermal Area Idaho Batholith Medicine Lake Geothermal Area Cascades Melozi Hot Springs Geothermal Area Alaska Geothermal...

  4. Great Basin College Direct Use Geothermal Demonstration Project

    SciTech Connect (OSTI)

    Rice, John

    2014-10-21

    This is the final technical report for the Great Basin College Direct Use Geothermal Demonstrationn Project, outlining the technical aspects of the User Group System.

  5. Two-Phase Westward Encroachment of Basin and Range Extension...

    Open Energy Info (EERE)

    Nevada Abstract 1 Structural, geophysical, and thermochronological data from the transition zone between the Sierra Nevada and the Basin and Range province at latitude 39N...

  6. Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi...

    Open Energy Info (EERE)

    Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

  7. Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi...

    Open Energy Info (EERE)

    Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi, Et Al., 2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

  8. Teleseismic-Seismic Monitoring At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Teleseismic-Seismic Monitoring At Northern Basin & Range Region (Biasi, Et Al., 2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

  9. Teleseismic-Seismic Monitoring At Northern Basin & Range Region...

    Open Energy Info (EERE)

    Teleseismic-Seismic Monitoring At Northern Basin & Range Region (Biasi, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

  10. Preparing T Plant to Store K-Basin Sludge

    SciTech Connect (OSTI)

    MCKENNEY, D.E.

    2003-01-01

    This paper will explain the history and status of the modification of the Hanford T Plant facility for storage of K Basin sludge.

  11. Linear depressions and collapse features in the Northwest Hueco Basin, West Texas 

    E-Print Network [OSTI]

    Henderson, Scott D

    1997-01-01

    The Northwest Hueco Basin, located in the Northern Chihuahuan Desert, is a fault bounded basin filled predominantly with Plio-Pleistocene unconsolidated sediments. The basin contains long linear depressions that dominate the surface topography...

  12. Title V permitting delayed for some non-major sources

    SciTech Connect (OSTI)

    Bassett, S.M.

    1996-03-01

    Some small businesses subject to the Clean Air Act`s maximum achievable control technology (MACT) regulations may be a break from the US Environmental Protection Agency (EPA). While the businesses, considered non-major air-pollutant sources, must still meet all MACT requirements, they are likely to receive a Title V operating permit program deferral. On December 13, 1995, EPA proposed to defer Title V operating permit requirements for non-major sources in the following three industries: decorative chromium electroplating and chromium anodizing; perchloroethylene dry cleaning; ethylene oxide commercial sterilization and fumigation. In addition to describing its reasons for the temporary deferments, EPA sets forth the rationale for permanently exempting certain non-major electroplating and anodizing sources. This rationale may pave the way for small businesses in other industries to escape Title V.

  13. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia: EnergyMaryland: Energy ResourcesVermont:Westway,NewWetland Permit

  14. WAC - 173-401 Operating Permit Regulation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,Village of Wellington,FL LLCImplementation1 Operating Permit

  15. Appendix F. Permits AnnualSiteEnvironmentalRepor

    E-Print Network [OSTI]

    Pennycook, Steve

    /01/2005 03/31/2010 DOE DOE BWXT CWA Pump & Haul 9720-82 SOP 04018 11/30/2004 11/30/2009 BWXT BWXT BWXT CWA Landfill VI (Postclosure care and maintenance) DML-01-103-0036 Permit terminated by TDEC 3/15/2007 NA DOE and maintenance) IDL-01-103-0189 Most recent modification approved 5/8/1992 DOE DOE/BJC BJC #12;Annual Site

  16. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  17. Hawaii Guide for Filing Community Noise Permit Applications | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynnMassachusetts:Ohio:Website Jump to: navigation,Information Permit

  18. File:05DrillingPermittingOverview.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, search File File

  19. File:06AKCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, search

  20. File:06IDBConstructionStormwaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History

  1. File:06MTCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source

  2. File:Permit factsheet.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdfgaspOregonSHPOClearanceForm.pdf JumpPermit

  3. New Mexico Guidelines for Public Notification for Air Quality Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures LtdNeville, Ohio:Archaeological Permits Webpage

  4. Characterization of the surface properties of Illinois Basin Coals. Technical report, September 1--November 30, 1991

    SciTech Connect (OSTI)

    Demir, I.

    1991-12-31

    The overall objective of this research project is to provide fundamental data on the physical and chemical surface properties of Illinois coals, specifically those of the Illinois Basin Coal Sample Program (IBCSP). This will help coal researchers achieve an optimal match between Illinois Basin coals and potential coal cleaning and conversion processes (or at least reduce the number of coals suitable for a particular process) and may lead to improved desulfurization and increased utilization of Illinois Basin coals. The specific tasks scheduled to meet our objective are: (1) Physical Characterization: Determine total surface area, porosity, pore size and volume distributions of IBCSP coals crushed to two particle sizes, {minus}100 and {minus}400 mesh (exclusive of IBC-108 which is available only in {minus}400 mesh form), in both an unoxidized and oxidized state. (2) Chemical Characterization: Determine the surface charge (electrokinetic mobility) as a function of pH by electrophoresis and analyze the surface chemical structure of the above samples using Diffuse Reflectance Infrared Spectroscopy (DRIS). (3) Multivariate Statistical Analyses: Explore possible relationships among the newly determined surface properties and other available characterization data, including chemical and petrographic compositions, vitrinite reflectance, free swelling index, ash yield, sulfur forms, and other relevant properties.

  5. State Waste Discharge Permit Application: Electric resistance tomography testing

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  6. Management Of Hanford KW Basin Knockout Pot Sludge As Spent Nuclear Fuel

    SciTech Connect (OSTI)

    Raymond, R. E. [CH2M HIll Plateau Remediation Company, Richland, WA (United States); Evans, K. M. [AREVA, Avignon (France)

    2012-10-22

    CH2M HILL Plateau Remediation Company (CHPRC) and AREVA Federal Services, LLC (AFS) have been working collaboratively to develop and deploy technologies to remove, transport, and interim store remote-handled sludge from the 10S-K West Reactor Fuel Storage Basin on the U.S. Department of Energy (DOE) Hanford Site near Richland, WA, USA. Two disposal paths exist for the different types of sludge found in the K West (KW) Basin. One path is to be managed as Spent Nuclear Fuel (SNF) with eventual disposal at an SNF at a yet to be licensed repository. The second path will be disposed as remote-handled transuranic (RH-TRU) waste at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, NM. This paper describes the systems developed and executed by the Knockout Pot (KOP) Disposition Subproject for processing and interim storage of the sludge managed as SNF, (i.e., KOP material).

  7. Parking Permit Application, Form HQ F 1400.12 rev 02-10 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Parking Permit Form, Headquarters, Forrestal Parking Permit Application, Form HQ F 1400.12 rev 02-10 More Documents & Publications DOE HQ F 1400.12 Customer Services Handbook,...

  8. Hawaii Clean Energy Initiative Permit to Cross or Enter the State...

    Open Energy Info (EERE)

    Hawaii Clean Energy Initiative Permit to Cross or Enter the State Energy Corridor Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance...

  9. V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    68: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

  10. U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory...

  11. Application for Inshore Catcher Vessel Cooperative Permit Page 1 of 6

    E-Print Network [OSTI]

    for the Aleutian Islands (AI) to engage in trawling for pollock in the AI; and · Permit sanctions. The vessel has no permit sanctions that otherwise make it ineligible to engage in fishing for pollock in the BSAI. (3

  12. V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

  13. V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks August 28, 2013 -...

  14. You Don't Need to Raise the Roof: Cutting Solar Permitting Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You Don't Need to Raise the Roof: Cutting Solar Permitting Costs for Wooden Rooftops You Don't Need to Raise the Roof: Cutting Solar Permitting Costs for Wooden Rooftops June 17,...

  15. 19 V.S.A. § 1111 Highway Right-of-Way Permit Application (Form...

    Open Energy Info (EERE)

    9 V.S.A. 1111 Highway Right-of-Way Permit Application (Form TA 210) Example Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  16. Bubblers Speed Nuclear Waste Processing at SRS

    SciTech Connect (OSTI)

    2010-11-14

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  17. Bubblers Speed Nuclear Waste Processing at SRS

    ScienceCinema (OSTI)

    None

    2014-08-06

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  18. Great Basin Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia:Oregon: EnergyGreat Basin Geothermal Area Jump to:

  19. Alden Wave Basin | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin: Energy ResourcesAirAlamoCalifornia:Wave Basin Jump to:

  20. National emission standards for hazardous air pollutants application for approval to stabilize the 105N Basin

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The 105N Basin (basin) Stabilization will place the basin in a radiologically and environmentally safe condition so that it can be decommissioned at a later date. The basin stabilization objectives are to inspect for Special Nuclear Material (SNM) (i.e., fuel assemblies and fuel pieces), remove the water from the basin and associated pits, and stabilize the basin surface. The stabilization will involve removal of basin hardware, removal of basin sediments, draining of basin water, and cleaning and stabilizing basin surfaces-to prevent resuspension of radioactive emissions to the air. These activities will be conducted in accordance with all applicable regulations. The basin is in the 105N Building, which is located in the 100N Area. The 100N Area is located in the Northern portion of the Hanford Site approximately 35 miles northwest of the city of Richland, Washington. The basin is a reinforced unlined concrete structure 150 feet long, 50 feet wide, and 24 feet deep. The basin is segregated into seven areas sharing a common pool of water; the Discharge/Viewing (``D``) Pit, the fuel segregation pit (including a water tunnel that connects the ``D`` pit and segregation pit), two storage basins designated as North Basin and South Basin, two cask load-out pits, and a fuel examination area. The North Basin floor is entirely covered and the South Basin is partly covered by a modular array of cubicles formed by boron concrete posts and boron concrete panels.

  1. Coho Salmon Master Plan, Clearwater River Basin.

    SciTech Connect (OSTI)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation facilities. This increase in survival is expected to provide the opportunity for the establishm

  2. Miami-Dade County- Expedited Green Buildings Process

    Broader source: Energy.gov [DOE]

    In an effort to promote environmentally sensitive design and construction, the Miami-Dade County Commissioners passed an ordinance in June 2005 to expedite the permitting process for “green”...

  3. Origin Basin Destination State STB EIA STB EIA Northern Appalachian...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Michigan 13.74 16.13 17.4% 99.82 16.2% 840 32.1% 100.0% Northern Appalachian Basin New Hampshire W 40.18 W 94.03 42.7% 699 W 100.0% Northern Appalachian Basin New Jersey W...

  4. Enhancing Sustainability in River Basin Management through Conflict

    E-Print Network [OSTI]

    Delaware, University of

    11 Enhancing Sustainability in River Basin Management through Conflict Resolution: Comparative channels, and effluents of massive quantities of point and non-point pollution from pipe, earth and sky .to be achieved. Conflict is inherent in river basin management,1 wherein diverse 'stakes' are held

  5. Progress in Understanding the Structural Geology, Basin Evolution,

    E-Print Network [OSTI]

    and local geologic mapping, drilling and coring, and seismic reflection profiling have in- creased vastly by intrabasinal highs. 4. Integration of stratigraphy and structural geology. The sedimentary deposits of half-graben are influenced by basin geometry; consequently, stratigraphy can be used to infer aspects of basin evolution

  6. Fraser River Basin &ssment Program Conceptual Monitoring Design

    E-Print Network [OSTI]

    #12;Fraser River Basin &ssment Program Conceptual Monitoring Design Prepared for Environment Canada Vancouver, B.C. V6J 5C6 Michael Paine EVS Environment Consultants 195 Pemberton Avenue North Vancouver, B. 1993. Fraser River Basin Assessment Program: Conceptual Monitoring Design. Pqared for Conservation

  7. NOAA Technical Memorandum ERL GLERL-1 LAKE ONTARIO BASIN

    E-Print Network [OSTI]

    NOAA Technical Memorandum ERL GLERL-1 LAKE ONTARIO BASIN: OVERLAND PRECIPITATION, 1972-73 David C. BASIC DATA 3. PROCEDURE 4. ACKNOWLEDGMBNTS APPENDIX. LAKE ONTARIO STATION SUMMARY Page iv 1 1 2 5 10 FIGURES 1. The United States portion of the Lake Ontario drainage basin with the precipitation stations

  8. Burialand exhumation historyof Pennsylvanian strata, central Appalachian basin: anintegrated study

    E-Print Network [OSTI]

    Bodnar, Robert J.

    Burialand exhumation historyof Pennsylvanian strata, central Appalachian basin: anintegrated study of Pennsylvanian strata in the central Appalachian foreland basin is constrained by integrating palaeothermometers homogenization temperatures indicate thatburial ofLower andUpperPennsylvanian strata of theAppalachianPlateau in

  9. Basin Resonances in the Equatorial Indian Ocean WEIQING HAN

    E-Print Network [OSTI]

    Han, Weiqing

    Basin Resonances in the Equatorial Indian Ocean WEIQING HAN Department of Atmospheric and Oceanic, LOCEAN, Paris, France BENE´ T DUNCAN Department of Atmospheric and Oceanic Sciences, University in the equatorial Indian Ocean (IO) interact to form basin resonances at the semiannual (180 day) and 90-day periods

  10. Current Trends in Logical Frameworks and Metalanguages David Basin

    E-Print Network [OSTI]

    Basin, David

    Current Trends in Logical Frameworks and Metalanguages David Basin Universitat Freiburg, Institut-Level Programming Languages (PLI'99) in Paris in September 1999. This workshop brought together designers, im Academic Publishers. Printed in the Netherlands. intro-final.tex; 24/01/2001; 17:13; p.1 #12; 2 Basin

  11. Licking River Basin, Cynthiana, Kentucky 24 March 2006

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Licking River Basin, Cynthiana, Kentucky 24 March 2006 Abstract: The recommended project would reduce flood damages in the communities of Cynthiana, Millersburg, and Paris, in the Licking River B Kentucky, by the construction of two dry bed detention basins on tributaries of the South Fork

  12. Modal Decay in the AustraliaAntarctic Basin WILBERT WEIJER

    E-Print Network [OSTI]

    Griesel, Alexa

    Modal Decay in the Australia­Antarctic Basin WILBERT WEIJER Los Alamos National Laboratory, Los VIVIER LOCEAN IPSL, Paris, France (Manuscript received 5 January 2009, in final form 11 June 2009) ABSTRACT The barotropic intraseasonal variability in the Australia­Antarctic Basin (AAB) is studied

  13. QUALITATIVE DISCUSSION OF ATLANTIC BASIN SEASONAL HURRICANE ACTIVITY FOR 2012

    E-Print Network [OSTI]

    Connors, Daniel A.

    QUALITATIVE DISCUSSION OF ATLANTIC BASIN SEASONAL HURRICANE ACTIVITY FOR 2012 We are discontinuing our early December quantitative hurricane forecast for the next year and giving a more qualitative discussion of the factors which will determine next year's Atlantic basin hurricane activity. Our early

  14. QUALITATIVE DISCUSSION OF ATLANTIC BASIN SEASONAL HURRICANE ACTIVITY FOR 2015

    E-Print Network [OSTI]

    Collett Jr., Jeffrey L.

    1 QUALITATIVE DISCUSSION OF ATLANTIC BASIN SEASONAL HURRICANE ACTIVITY FOR 2015 We discontinued our early December quantitative hurricane forecast in 2012 and are now giving a more qualitative discussion of the factors which will determine next year's Atlantic basin hurricane activity. One of the big uncertainties

  15. MULTICOMPONENT SEISMIC ANALYSIS AND CALIBRATION TO IMPROVE RECOVERY FROM ALGAL MOUNDS: APPLICATION TO THE ROADRUNNER/TOWAOC AREA OF THE PARADOX BASIN, UTE MOUNTAIN UTE RESERVATION, COLORADO

    SciTech Connect (OSTI)

    Paul La Pointe; Claudia Rebne; Steve Dobbs

    2003-07-10

    This report describes the results made in fulfillment of contract DE-FG26-02NT15451, ''Multicomponent Seismic Analysis and Calibration to Improve Recovery from Algal Mounds: Application to the Roadrunner/Towaoc Area of the Paradox Basin, Ute Mountain Ute Reservation, Colorado''. Optimizing development of highly heterogeneous reservoirs where porosity and permeability vary in unpredictable ways due to facies variations can be challenging. An important example of this is in the algal mounds of the Lower and Upper Ismay reservoirs of the Paradox Basin in Utah and Colorado. It is nearly impossible to develop a forward predictive model to delineate regions of better reservoir development, and so enhanced recovery processes must be selected and designed based upon data that can quantitatively or qualitatively distinguish regions of good or bad reservoir permeability and porosity between existing well control. Recent advances in seismic acquisition and processing offer new ways to see smaller features with more confidence, and to characterize the internal structure of reservoirs such as algal mounds. However, these methods have not been tested. This project will acquire cutting edge, three-dimensional, nine-component (3D9C) seismic data and utilize recently-developed processing algorithms, including the mapping of azimuthal velocity changes in amplitude variation with offset, to extract attributes that relate to variations in reservoir permeability and porosity. In order to apply advanced seismic methods a detailed reservoir study is needed to calibrate the seismic data to reservoir permeability, porosity and lithofacies. This will be done by developing a petrological and geological characterization of the mounds from well data; acquiring and processing the 3D9C data; and comparing the two using advanced pattern recognition tools such as neural nets. In addition, should the correlation prove successful, the resulting data will be evaluated from the perspective of selecting alternative enhanced recovery processes, and their possible implementation. The work is being carried out on the Roadrunner/Towaoc Fields of the Ute Mountain Ute Tribe, located in the southwestern corner of Colorado. Although this project is focused on development of existing resources, the calibration established between the reservoir properties and the 3D9C seismic data can also enhance exploration success. During the time period covered by this report, the majority of the project effort has gone into the permitting, planning and design of the 3D seismic survey, and to select a well for the VSP acquisition. The business decision in October, 2002 by WesternGeco, the projects' seismic acquisition contractor, to leave North America, has delayed the acquisition until late summer, 2003. The project has contracted Solid State, a division of Grant Geophysical, to carry out the acquisition. Moreover, the survey has been upgraded to a 3D9C from the originally planned 3D3C survey, which should provide even greater resolution of mounds and internal mound structure.

  16. Fall 2015 -2016 PARKING PERMIT RATES (as of 7/22/15) LOWER PRICE OPTIONS

    E-Print Network [OSTI]

    Fall 2015 - 2016 PARKING PERMIT RATES (as of 7/22/15) LOWER PRICE OPTIONS West Campus Lot ­ Annual $550.00 Lot R ­ Annual (Liberty Sq/Potomac Hts residents only) $575.00 RESERVED PARKING DECK PERMITS for the following parking options) Adjunct Faculty Permit ­ Semester (only valid in Lot K, PV Lot, and the Field

  17. The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector

    E-Print Network [OSTI]

    McCarl, Bruce A.

    The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector Prepared by: Bruce Mc Washington, D.C. April 1999 #12;ICF 1 The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector be accomplished through a carbon cap and trade system, under which carbon permit prices would emerge

  18. Water-related Issues Affecting Conventional Oil and Gas Recovery and Potential Oil-Shale Development in the Uinta Basin, Utah

    SciTech Connect (OSTI)

    Michael Vanden Berg; Paul Anderson; Janae Wallace; Craig Morgan; Stephanie Carney

    2012-04-30

    Saline water disposal is one of the most pressing issues with regard to increasing petroleum and natural gas production in the Uinta Basin of northeastern Utah. Conventional oil fields in the basin provide 69 percent of Utah?s total crude oil production and 71 percent of Utah?s total natural gas, the latter of which has increased 208% in the past 10 years. Along with hydrocarbons, wells in the Uinta Basin produce significant quantities of saline water ? nearly 4 million barrels of saline water per month in Uintah County and nearly 2 million barrels per month in Duchesne County. As hydrocarbon production increases, so does saline water production, creating an increased need for economic and environmentally responsible disposal plans. Current water disposal wells are near capacity, and permitting for new wells is being delayed because of a lack of technical data regarding potential disposal aquifers and questions concerning contamination of freshwater sources. Many companies are reluctantly resorting to evaporation ponds as a short-term solution, but these ponds have limited capacity, are prone to leakage, and pose potential risks to birds and other wildlife. Many Uinta Basin operators claim that oil and natural gas production cannot reach its full potential until a suitable, long-term saline water disposal solution is determined. The enclosed project was divided into three parts: 1) re-mapping the base of the moderately saline aquifer in the Uinta Basin, 2) creating a detailed geologic characterization of the Birds Nest aquifer, a potential reservoir for large-scale saline water disposal, and 3) collecting and analyzing water samples from the eastern Uinta Basin to establish baseline water quality. Part 1: Regulators currently stipulate that produced saline water must be disposed of into aquifers that already contain moderately saline water (water that averages at least 10,000 mg/L total dissolved solids). The UGS has re-mapped the moderately saline water boundary in the subsurface of the Uinta Basin using a combination of water chemistry data collected from various sources and by analyzing geophysical well logs. By re-mapping the base of the moderately saline aquifer using more robust data and more sophisticated computer-based mapping techniques, regulators now have the information needed to more expeditiously grant water disposal permits while still protecting freshwater resources. Part 2: Eastern Uinta Basin gas producers have identified the Birds Nest aquifer, located in the Parachute Creek Member of the Green River Formation, as the most promising reservoir suitable for large-volume saline water disposal. This aquifer formed from the dissolution of saline minerals that left behind large open cavities and fractured rock. This new and complete understanding the aquifer?s areal extent, thickness, water chemistry, and relationship to Utah?s vast oil shale resource will help operators and regulators determine safe saline water disposal practices, directly impacting the success of increased hydrocarbon production in the region, while protecting potential future oil shale production. Part 3: In order to establish a baseline of water quality on lands identified by the U.S. Bureau of Land Management as having oil shale development potential in the southeastern Uinta Basin, the UGS collected biannual water samples over a three-year period from near-surface aquifers and surface sites. The near-surface and relatively shallow groundwater quality information will help in the development of environmentally sound water-management solutions for a possible future oil shale and oil sands industry and help assess the sensitivity of the alluvial and near-surface bedrock aquifers. This multifaceted study will provide a better understanding of the aquifers in Utah?s Uinta Basin, giving regulators the tools needed to protect precious freshwater resources while still allowing for increased hydrocarbon production.

  19. Radioactive air emissions notice of construction for the 105N Basin Stabilization

    SciTech Connect (OSTI)

    Coenenberg, E.T. [Westinghouse Hanford Co., Richland, WA (United States)

    1994-05-01

    The 105N Basin (basin) Stabilization will place the basin in a radiologically and environmentally safe condition so that it can be decommissioned at a later date. The basin is in the 105N Building, which is located in the 100N Area. The 100N Area is located in the Northern portion of the Hanford Site approximately 35 miles northwest of the city of Richland, Washington. The basin stabilization objectives are to inspect for Special Nuclear Material (SNM) (i.e., fuel assemblies and fuel pieces), remove the water from the basin and associated pits, and stabilize the basin surface. The stabilization will involve removal of basin hardware, removal of basin sediments, draining of basin water, and cleaning and stabilizing basin surfaces to prevent resuspension of radioactive emissions to the air. These activities will be conducted in accordance with all applicable regulations.

  20. Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 Mark Person*1

    E-Print Network [OSTI]

    Gable, Carl W.

    technical constraints on the injection of CO2 into deep (>1.5 km) reservoirs under supercritical75 this amount of annual CO2 production. Assuming that CO2 is emplaced as a80 supercritical fluid havingPage | 1 Assessment of Basin-Scale Hydrologic Impacts of CO2 Sequestration, Illinois Basin1 2 3 4