Sample records for baseline projection co-benefits

  1. Accounting for Co-benefits in Asia's Transportation Sector: Methods...

    Open Energy Info (EERE)

    has two objectives. The first is to examine methodological issues involved in using guidelines to measure co-benefits from transport projects (developing baselines,...

  2. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13T23:59:59.000Z

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  3. Multiproject baselines for evaluation of electric power projects

    SciTech Connect (OSTI)

    Sathaye, Jayant; Murtishaw, Scott; Price, Lynn; Lefranc, Maurice; Roy, Joyashree; Winkler, Harald; Spalding-Fecher, Randall

    2003-03-12T23:59:59.000Z

    Calculating greenhouse gas emissions reductions from climate change mitigation projects requires construction of a baseline that sets emissions levels that would have occurred without the project. This paper describes a standardized multiproject methodology for setting baselines, represented by the emissions rate (kg C/kWh), for electric power projects. A standardized methodology would reduce the transaction costs of projects. The most challenging aspect of setting multiproject emissions rates is determining the vintage and types of plants to include in the baseline and the stringency of the emissions rates to be considered, in order to balance the desire to encourage no- or low-carbon projects while maintaining environmental integrity. The criteria for selecting power plants to include in the baseline depend on characteristics of both the project and the electricity grid it serves. Two case studies illustrate the application of these concepts to the electric power grids in eastern India and South Africa. We use hypothetical, but realistic, climate change projects in each country to illustrate the use of the multiproject methodology, and note the further research required to fully understand the implications of the various choices in constructing and using these baselines.

  4. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    SciTech Connect (OSTI)

    Womack, J.C. [Westinghouse Hanford Co., Richland, WA (United States); Cramond, R. [TRW (United States); Paedon, R.J. [SAIC (United States)] [and others

    1995-03-13T23:59:59.000Z

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also.

  5. Revised SRC-I project baseline. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1984-01-01T23:59:59.000Z

    International Coal Refining Company (ICRC), in cooperation with the Commonwealth of Kentucky has contracted with the United States Department of Energy (DOE) to design, build and operate a first-of-its-kind plant demonstrating the economic, environmental, socioeconomic and technical feasibility of the direct coal liquefaction process known as SRC-I. ICRC has made a massive commitment of time and expertise to design processes, plan and formulate policy, schedules, costs and technical drawings for all plant systems. These fully integrated plans comprise the Project Baseline and are the basis for all future detailed engineering, plant construction, operation, and other work set forth in the contract between ICRC and the DOE. Volumes I and II of the accompanying documents constitute the updated Project Baseline for the SRC-I two-stage liquefaction plant. International Coal Refining Company believes this versatile plant design incorporates the most advanced coal liquefaction system available in the synthetic fuels field. SRC-I two-stage liquefaction, as developed by ICRC, is the way of the future in coal liquefaction because of its product slate flexibility, high process thermal efficiency, and low consumption of hydrogen. The SRC-I Project Baseline design also has made important state-of-the-art advances in areas such as environmental control systems. Because of a lack of funding, the DOE has curtailed the total project effort without specifying a definite renewal date. This precludes the development of revised accurate and meaningful schedules and, hence, escalated project costs. ICRC has revised and updated the original Design Baseline to include in the technical documentation all of the approved but previously non-incorporated Category B and C and new Post-Baseline Engineering Change Proposals.

  6. Baseline projections of transportation energy consumption by mode: 1981 update

    SciTech Connect (OSTI)

    Millar, M; Bunch, J; Vyas, A; Kaplan, M; Knorr, R; Mendiratta, V; Saricks, C

    1982-04-01T23:59:59.000Z

    A comprehensive set of activity and energy-demand projections for each of the major transportation modes and submodes is presented. Projections are developed for a business-as-usual scenario, which provides a benchmark for assessing the effects of potential conservation strategies. This baseline scenario assumes a continuation of present trends, including fuel-efficiency improvements likely to result from current efforts of vehicle manufacturers. Because of anticipated changes in fuel efficiency, fuel price, modal shifts, and a lower-than-historic rate of economic growth, projected growth rates in transportation activity and energy consumption depart from historic patterns. The text discusses the factors responsible for this departure, documents the assumptions and methodologies used to develop the modal projections, and compares the projections with other efforts.

  7. U.S. Baseline Briefing Book Projections for Agricultural and Biofuel Markets

    E-Print Network [OSTI]

    Noble, James S.

    U.S. Baseline Briefing Book Projections for Agricultural and Biofuel, biofuel, government cost and farm income projections in this report were prepared by the team at FAPRIMU

  8. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26T23:59:59.000Z

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  9. US LHC Accelerator Project Baseline Change Request BCR Number 58

    E-Print Network [OSTI]

    Large Hadron Collider Program

    to correspond to the current LHC installation schedule, constrained by the U.S. LHC Project end-of-project

  10. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    SciTech Connect (OSTI)

    None

    1982-03-01T23:59:59.000Z

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  11. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  12. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    SciTech Connect (OSTI)

    Iovenitti, Joe

    2013-05-15T23:59:59.000Z

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  13. Multi-Project Baselines for Evaluation of Industrial Energy-Efficiency and Electric Power Projects

    E-Print Network [OSTI]

    2001-01-01T23:59:59.000Z

    of Industrial Energy-Efficiency and Electric Power Projectsof Industrial Energy-Efficiency and Electric Power ProjectsOf Industrial Energy-Efficiency And Electric Power Projects

  14. Multi-project baselines for potential clean development mechanism projects in the electricity sector in South Africa

    SciTech Connect (OSTI)

    Winkler, H.; Spalding-Fecher, R.; Sathaye, J.; Price, L.

    2002-06-26T23:59:59.000Z

    The United Nations Framework Convention on Climate Change (UNFCCC) aims to reduce emissions of greenhouse gases (GHGs) in order to ''prevent dangerous anthropogenic interference with the climate system'' and promote sustainable development. The Kyoto Protocol, which was adopted in 1997 and appears likely to be ratified by 2002 despite the US withdrawing, aims to provide means to achieve this objective. The Clean Development Mechanism (CDM) is one of three ''flexibility mechanisms'' in the Protocol, the other two being Joint Implementation (JI) and Emissions Trading (ET). These mechanisms allow flexibility for Annex I Parties (industrialized countries) to achieve reductions by extra-territorial as well as domestic activities. The underlying concept is that trade and transfer of credits will allow emissions reductions at least cost. Since the atmosphere is a global, well-mixed system, it does not matter where greenhouse gas emissions are reduced. The CDM allows Annex I Parties to meet part of their emissions reductions targets by investing in developing countries. CDM projects must also meet the sustainable development objectives of the developing country. Further criteria are that Parties must participate voluntarily, that emissions reductions are ''real, measurable and long-term'', and that they are additional to those that would have occurred anyway. The last requirement makes it essential to define an accurate baseline. The remaining parts of section 1 outline the theory of baselines, emphasizing the balance needed between environmental integrity and reducing transaction costs. Section 2 develops an approach to multi-project baseline for the South African electricity sector, comparing primarily to near future capacity, but also considering recent plants. Five potential CDM projects are briefly characterized in section 3, and compared to the baseline in section 4. Section 5 concludes with a discussion of options and choices for South Africa regarding electricity sector baselines.

  15. A Self-Consistent Method to Assess Air Quality Co-Benefits

    E-Print Network [OSTI]

    A Self-Consistent Method to Assess Air Quality Co-Benefits from US Climate Policies Rebecca Saari;1 A Self-Consistent Method to Assess Air Quality Co-Benefits from US Climate Policies Rebecca Saari

  16. The mixed waste management facility. Project baseline revision 1.2

    SciTech Connect (OSTI)

    Streit, R.D.; Throop, A.L.

    1995-04-01T23:59:59.000Z

    Revision 1.2 to the Project Baseline (PB) for the Mixed Waste Management Facility (MWMF) is in response to DOE directives and verbal guidance to (1) Collocate the Decontamination and Waste Treatment Facility (DWTF) and MWMF into a single complex, integrate certain and overlapping functions as a cost-saving measure; (2) Meet certain fiscal year (FY) new-BA funding objectives ($15.3M in FY95) with lower and roughly balanced funding for out years; (3) Reduce Total Project Cost (TPC) for the MWMF Project; (4) Include costs for all appropriate permitting activities in the project TPC. This baseline revision also incorporates revisions in the technical baseline design for Molten Salt Oxidation (MSO) and Mediated Electrochemical Oxidation (MEO). Changes in the WBS dictionary that are necessary as a result of this rebaseline, as well as minor title changes, at WBS Level 3 or above (DOE control level) are approved as a separate document. For completeness, the WBS dictionary that reflects these changes is contained in Appendix B. The PB, with revisions as described in this document, were also the basis for the FY97 Validation Process, presented to DOE and their reviewers on March 21-22, 1995. Appendix C lists information related to prior revisions to the PB. Several key changes relate to the integration of functions and sharing of facilities between the portion of the DWTF that will house the MWMF and those portions that are used by the Hazardous Waste Management (HWM) Division at LLNL. This collocation has been directed by DOE as a cost-saving measure and has been implemented in a manner that maintains separate operational elements from a safety and permitting viewpoint. Appendix D provides background information on the decision and implications of collocating the two facilities.

  17. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    SciTech Connect (OSTI)

    Iovenitti, Joe

    2014-01-02T23:59:59.000Z

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodology calibration purposes because, in the public domain, it is a highly characterized geothermal system in the Basin and Range with a considerable amount of geoscience and most importantly, well data. The overall project area is 2500km2 with the Calibration Area (Dixie Valley Geothermal Wellfield) being about 170km2. The project was subdivided into five tasks (1) collect and assess the existing public domain geoscience data; (2) design and populate a GIS database; (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area at 0.5km intervals to identify EGS drilling targets at a scale of 5km x 5km; (4) collect new geophysical and geochemical data, and (5) repeat Task 3 for the enhanced (baseline + new ) data. Favorability maps were based on the integrated assessment of the three critical EGS exploration parameters of interest: rock type, temperature and stress. A complimentary trust map was generated to compliment the favorability maps to graphically illustrate the cumulative confidence in the data used in the favorability mapping. The Final Scientific Report (FSR) is submitted in two parts with Part I describing the results of project Tasks 1 through 3 and Part II covering the results of project Tasks 4 through 5 plus answering nine questions posed in the proposal for the overall project. FSR Part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature. However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region.

  18. Comparison of the 1984 DOE/EIA annual energy outlook and the 1984 GRI baseline projection

    SciTech Connect (OSTI)

    Ashby, A.; Holtberg, P.; Woods, T.

    1985-01-01T23:59:59.000Z

    A comparative analysis of the Gas Research Institute (GRI) Baseline Projection of US Energy Supply and Demand with the DOE/EIA 1984 Annual Energy Outlook shows many similar assumptions, but many cases of widening differences between the projections of primary energy consumption and sector-specific energy consumption. The DOE/EIA expects a faster and more significant decline in the electricity to natural gas price ratio, lower sector-specific end-use prices of refined petroleum products, and a faster growth in industrial raw material energy demand. In contrast to the GRI report, it also omits an estimate of industrial cogeneration and does not retire any exisiting generating capacity. The report examines the basic assumptions and results of both projections using five scenarios. 17 tables.

  19. Transport Co-benefits Calculator | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <MaintainedInformationThePtyTownTramaTransport Co-benefits

  20. Co-benefits Evaluation Tools | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CER esDatasetCityFundCo-benefits Evaluation Tools Jump

  1. Co-benefits Risk Assessment (COBRA) Screening Model | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CER esDatasetCityFundCo-benefits Evaluation Tools

  2. COMPARISON OF THREE METHODS TO PROJECT FUTURE BASELINE CARBON EMISSIONS IN TEMPERATE RAINFOREST, CURINANCO, CHILE

    SciTech Connect (OSTI)

    Patrick Gonzalez; Antonio Lara; Jorge Gayoso; Eduardo Neira; Patricio Romero; Leonardo Sotomayor

    2005-07-14T23:59:59.000Z

    Deforestation of temperate rainforests in Chile has decreased the provision of ecosystem services, including watershed protection, biodiversity conservation, and carbon sequestration. Forest conservation can restore those ecosystem services. Greenhouse gas policies that offer financing for the carbon emissions avoided by preventing deforestation require a projection of future baseline carbon emissions for an area if no forest conservation occurs. For a proposed 570 km{sup 2} conservation area in temperate rainforest around the rural community of Curinanco, Chile, we compared three methods to project future baseline carbon emissions: extrapolation from Landsat observations, Geomod, and Forest Restoration Carbon Analysis (FRCA). Analyses of forest inventory and Landsat remote sensing data show 1986-1999 net deforestation of 1900 ha in the analysis area, proceeding at a rate of 0.0003 y{sup -1}. The gross rate of loss of closed natural forest was 0.042 y{sup -1}. In the period 1986-1999, closed natural forest decreased from 20,000 ha to 11,000 ha, with timber companies clearing natural forest to establish plantations of non-native species. Analyses of previous field measurements of species-specific forest biomass, tree allometry, and the carbon content of vegetation show that the dominant native forest type, broadleaf evergreen (bosque siempreverde), contains 370 {+-} 170 t ha{sup -1} carbon, compared to the carbon density of non-native Pinus radiata plantations of 240 {+-} 60 t ha{sup -1}. The 1986-1999 conversion of closed broadleaf evergreen forest to open broadleaf evergreen forest, Pinus radiata plantations, shrublands, grasslands, urban areas, and bare ground decreased the carbon density from 370 {+-} 170 t ha{sup -1} carbon to an average of 100 t ha{sup -1} (maximum 160 t ha{sup -1}, minimum 50 t ha{sup -1}). Consequently, the conversion released 1.1 million t carbon. These analyses of forest inventory and Landsat remote sensing data provided the data to evaluate the three methods to project future baseline carbon emissions. Extrapolation from Landsat change detection uses the observed rate of change to estimate change in the near future. Geomod is a software program that models the geographic distribution of change using a defined rate of change. FRCA is an integrated spatial analysis of forest inventory, biodiversity, and remote sensing that produces estimates of forest biodiversity and forest carbon density, spatial data layers of future probabilities of reforestation and deforestation, and a projection of future baseline forest carbon sequestration and emissions for an ecologically-defined area of analysis. For the period 1999-2012, extrapolation from Landsat change detection estimated a loss of 5000 ha and 520,000 t carbon from closed natural forest; Geomod modeled a loss of 2500 ha and 250 000 t; FRCA projected a loss of 4700 {+-} 100 ha and 480,000 t (maximum 760,000 t, minimum 220,000 t). Concerning labor time, extrapolation for Landsat required 90 actual days or 120 days normalized to Bachelor degree level wages; Geomod required 240 actual days or 310 normalized days; FRCA required 110 actual days or 170 normalized days. Users experienced difficulties with an MS-DOS version of Geomod before turning to the Idrisi version. For organizations with limited time and financing, extrapolation from Landsat change provides a cost-effective method. Organizations with more time and financing could use FRCA, the only method where that calculates the deforestation rate as a dependent variable rather than assuming a deforestation rate as an independent variable. This research indicates that best practices for the projection of baseline carbon emissions include integration of forest inventory and remote sensing tasks from the beginning of the analysis, definition of an analysis area using ecological characteristics, use of standard and widely used geographic information systems (GIS) software applications, and the use of species-specific allometric equations and wood densities developed for local species.

  3. Multi-Project Baselines for Evaluation of Industrial Energy-Efficiency and Electric Power Projects

    E-Print Network [OSTI]

    2001-01-01T23:59:59.000Z

    and wind to meet the off grid supply. The future expansionagency for decentralized off-grid supply of power of 6 MW ofProject 5 is based on Off-grid Solar Home Systems. The aim

  4. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    FSR Part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature. However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region.

  5. JICA's Assistance for Mitigation to Climate Change - The Co-Benefits...

    Open Energy Info (EERE)

    JICA's Assistance for Mitigation to Climate Change - The Co-Benefits Approach to Climate Change Jump to: navigation, search Tool Summary LAUNCH TOOL Name: JICA's Assistance for...

  6. Breckinridge Project, initial effort. Report VII, Volume II. Environmental baseline report

    SciTech Connect (OSTI)

    none,

    1982-01-01T23:59:59.000Z

    Ashland Synthetic Fuels, Inc. (ASFI) and Airco Energy Company, Inc. (AECI) have recently formed the Breckinridge Project and are currently conducting a process and economic feasibility study of a commercial scale facility to produce synthetic liquid fuels from coal. The coal conversion process to be used is the H-COAL process, which is in the pilot plant testing stage under the auspices of the US Department of Energy at the H-COAL Pilot Plant Project near Catlettsburg, Kentucky. The preliminary plans for the commercial plant are for a 18,140 metric ton/day (24,000 ton/day) nominal coal assumption capacity utilizing the abundant high sulfur Western Kentucky coals. The Western Kentucky area offers a source of the coal along with adequate water, power, labor, transportation and other factors critical to the successful siting of a plant. Various studies by federal and state governments, as well as private industry, have reached similar conclusions regarding the suitability of such plant sites in western Kentucky. Of the many individual sites evaluated, a site in Breckinridge County, Kentucky, approximately 4 kilometers (2.5 miles) west of the town of Stephensport, has been identified as the plant location. Actions have been taken to obtain options to insure that this site will be available when needed. This report contains an overview of the regional setting and results of the baseline environmental studies. These studies include collection of data on ambient air and water quality, sound, aquatic and terrestrial biology and geology. This report contains the following chapters; introduction, review of significant findings, ambient air quality monitoring, sound, aquatic ecology, vegetation, wildlife, geology, soils, surface water, and ground water.

  7. Multi-project baselines for potential clean development mechanism projects in the electricity sector in South Africa

    E-Print Network [OSTI]

    Winkler, H.; Spalding-Fecher, R.; Sathaye, J.; Price, L.

    2002-01-01T23:59:59.000Z

    projects in the electricity sector in South Africa. JournalMechanism projects in the electricity sector in South AfricaCDM projects in the electricity sector References UNFCCC,

  8. A Self-Consistent Method to Assess Air Quality Co-Benefits from US Climate Policies

    E-Print Network [OSTI]

    Saari, R.

    Air quality co-benefits can potentially reduce the costs of greenhouse gas mitigation. However, while many studies of the cost of greenhouse gas mitigation model the full macroeconomic welfare impacts, most studies of air ...

  9. Special Issue On Estimation Of Baselines And Leakage In Carbon Mitigation Forestry Projects

    E-Print Network [OSTI]

    Sathaye, Jayant A.; Andrasko, Kenneth

    2008-01-01T23:59:59.000Z

    In Carbon Mitigation Forestry Projects Jayant A. Sathaye*,climate change. Interest in forestry mitigation activitiesled to the inclusion of forestry practices at the project

  10. Mainstreaming Transport Co-benefits Approach: A Guide to Evaluating...

    Open Energy Info (EERE)

    Guide to Evaluating Transport Projects AgencyCompany Organization: Institute for Global Environmental Strategies Focus Area: Multi-sector Impact Evaluation Topics: Best Practices...

  11. Life cycle baseline summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    The purpose of the Isotopes Facility Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economically as possible. This baseline plan establishes the official target schedule for completing the deactivation work and the associated budget required for deactivation and the necessary S&M. Deactivation of the facilities 3026C, 3026D, 3028, 3029, 3038E, 3038M, and 3038AHF, the Center Circle buildings 3047, 3517, and 7025 will continue though Fiscal Year (FY) 1999. The focus of the project in the early years will be on the smaller buildings that require less deactivation and can bring an early return in reducing S&M costs. This baseline plan covers the period from FY1995 throughout FY2000. Deactivation will continue in various facilities through FY1999. A final year of S&M will conclude the project in FY2000. The estimated total cost of the project during this period is $51M.

  12. Baselines For Land-Use Change In The Tropics: Application To Avoided Deforestation Projects

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    E. Chiapas, Mexico, and F. Campeche, Mexico. “Project area”Atlantic Rainforest). Campeche, MX Lowland moist with dryBolivia Paraná, Brazil Campeche, Mexico Chiapas, Mexico

  13. Special Issue On Estimation Of Baselines And Leakage In Carbon Mitigation Forestry Projects

    E-Print Network [OSTI]

    Sathaye, Jayant A.; Andrasko, Kenneth

    2008-01-01T23:59:59.000Z

    Tropical Region Estimates Bolivia, Noel Avoided 5-42Tropics; one each in Belize, Bolivia, and Brazil and threeproject, Noel Kempff in Bolivia, the FAC approach projects

  14. Baselines For Land-Use Change In The Tropics: Application To Avoided Deforestation Projects

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    in Mexico: making carbon sequestration a by-product ofthe area of the pilot carbon sequestration projects in theseLUCS = Land Use and Carbon Sequestration model, and GEOMOD =

  15. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    SciTech Connect (OSTI)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20T23:59:59.000Z

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  16. ASPEN computer simulations of the mixed waste treatment project baseline flowsheet

    SciTech Connect (OSTI)

    Dietsche, L.J.; Upadhye, R.S.; Camp, D.W.; Pendergrass, J.A.; Borduin, L.C.; Thompson, T.K.

    1994-07-05T23:59:59.000Z

    The treatment and disposal of mixed waste (i.e., waste containing both hazardous and radioactive components) is a challenging waste- management problem of particular concern to Department of Energy (DOE) sites throughout the United States. Traditional technologies used for destroying hazardous wastes must be re- evaluated for their ability to handle mixed wastes, and, in some cases, new technologies must be developed. The Mixed Waste Treatment Project (MWTP), a collaborative effort between Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, and Pacific Northwest Laboratory (PNL), was established by the DOE`s Waste Operations Program (EM-30) to develop and analyze alternative mixed waste treatment approaches. One of the MWTP`s initiatives, and the objective of this study, was to develop flowsheets for prototype, integrated, mixed-waste treatment facilities that can serve as models for sites developing their own treatment strategies. Evaluation of these flowsheets is being facilitated through the use of computer modeling. The objectives of the flowsheet simulations are to compare process effectiveness and costs of alternative flowsheets and to determine if commercial process-simulation software could be used on the large, complex process of an integrated mixed waste processing facility. Flowsheet modeling is needed to evaluate many aspects of proposed flowsheet designs. A major advantage of modeling the complete flowsheet is the ability to define the internal recycle streams, thereby making it possible to evaluate the impact of one operation on the whole plant. Many effects that can be seen only in this way. Modeling also can be used to evaluate sensitivity and range of operating conditions, radioactive criticality, and relative costs of different flowsheet designs. Further, the modeled flowsheets must be easily modified so that one can examine how alternative technologies and varying feed streams affect the overall integrated process.

  17. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    energy projects (small hydro and bagasse co-generators) andPCF) in Guatemala for a small hydro project assumes that the

  18. Methodological and Practical Considerations for DevelopingMultiproject Baselines for Electric Power and Cement Industry Projects inCentral America

    SciTech Connect (OSTI)

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion,Kristel

    2004-09-02T23:59:59.000Z

    The Lawrence Berkeley National Laboratory (Berkeley Lab) andthe Center for Sustainable Development in the Americas (CSDA) conductedtechnical studies and organized two training workshops to developcapacity in Central America for the evaluation of climate changeprojects. This paper describes the results of two baseline case studiesconducted for these workshops, one for the power sector and one for thecement industry, that were devised to illustrate certain approaches tobaseline setting. Multiproject baseline emission rates (BERs) for themain Guatemalan electricity grid were calculated from 2001 data. Inrecent years, the Guatemalan power sector has experienced rapid growth;thus, a sufficient number of new plants have been built to estimateviable BERs. We found that BERs for baseload plants offsetting additionalbaseload capacity ranged from 0.702 kgCO2/kWh (using a weighted averagestringency) to 0.507 kgCO2/kWh (using a 10th percentile stringency),while the baseline for plants offsetting load-followingcapacity is lowerat 0.567 kgCO2/kWh. For power displaced from existing load-followingplants, the rate is higher, 0.735 kgCO2/kWh, as a result of the age ofsome plants used for meeting peak loads and the infrequency of their use.The approved consolidated methodology for the Clean Development Mechanismyields a single rate of 0.753 kgCO2/kWh. Due to the relatively smallnumber of cement plants in the region and the regional nature of thecement market, all of Central America was chosen as the geographicboundary for setting cement industry BERs. Unfortunately, actualoperations and output data were unobtainable for most of the plants inthe region, and many data were estimated. Cement industry BERs rangedfrom 205 kgCO2 to 225 kgCO2 per metric ton of cement.

  19. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    energy projects. Several bagasse cogeneration and hydroprojects (small hydro and bagasse co-generators) and 201 MWgrid. These facilities burn bagasse when it is available and

  20. Co-benefits of Carbon Standards Part 1: Air Pollution Changes under Different 111d Options for Existing Power Plants

    E-Print Network [OSTI]

    Mohan, Chilukuri K.

    Co-benefits of Carbon Standards Part 1: Air Pollution Changes under Different 111d Options for existing power plants would decrease emissions of co-pollutants that contribute to local and regional air pollution standard would improve air quality and decrease the deposition of harmful pollutants. It is well

  1. UNFCCC-Consolidated baseline and monitoring methodology for landfill...

    Open Energy Info (EERE)

    UNFCCC-Consolidated baseline and monitoring methodology for landfill gas project activities Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNFCCC-Consolidated baseline...

  2. Estimation and Analysis of Life Cycle Costs of Baseline Enhanced...

    Open Energy Info (EERE)

    Estimation and Analysis of Life Cycle Costs of Baseline Enhanced Geothermal Systems Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title...

  3. Hazard Baseline Documentation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-12-04T23:59:59.000Z

    This standard establishes uniform Office of Environmental Management (EM) guidance on hazard baseline documents that identify and control radiological and non-radiological hazards for all EM facilities.

  4. South Africa - Greenhouse Gas Emission Baselines and Reduction...

    Open Energy Info (EERE)

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  5. Ethiopia-National Greenhouse Gas Emissions Baseline Scenarios...

    Open Energy Info (EERE)

    UNEP Risoe Centre on Energy Environment and Sustainable Development URC Sector Climate, Energy, Land Topics Baseline projection, Low emission development planning, -LEDS,...

  6. US Biofuels Baseline and impact of extending the

    E-Print Network [OSTI]

    Noble, James S.

    June 2011 US Biofuels Baseline and impact of extending the $0.45 ethanol blenders baseline projections for agricultural and biofuel markets.1 That baseline assumed current biofuel policy for cellulosic biofuels was assumed to expire at the end of 2012. This report compares a slightly modified

  7. EA-1943: Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment Project (LBNF/DUNE) at Fermilab, Batavia, Illinois and the Sanford Underground Research Facility, Lead, South Dakota

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of using the existing Main Injector Accelerator at Fermilab to produce a pure beam of muon neutrinos. The neutrinos would be examined at a "near detector" proposed to be constructed at Fermilab, and at a "far detector," at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. NOTE: This Project was previously designated (DOE/EA-1799).

  8. Solid Waste Program technical baseline description

    SciTech Connect (OSTI)

    Carlson, A.B.

    1994-07-01T23:59:59.000Z

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  9. Regional Energy Baseline 

    E-Print Network [OSTI]

    Kim, H.; Baltazar, J.C.; Haberl, J.

    2011-01-01T23:59:59.000Z

    ESL-TR-11-09-02 REGIONAL ENERGY BASELINE (1960 ~ 2009) 0 100 200 300 400 500 600 700 800 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 To tal En erg y U se pe r C ap ita (M MB tu) Year Total Energy... Use per Capita (1960-2009) US SEEC 12-States TX Hyojin Kim Juan-Carlos Baltazar, Ph.D. Jeff S. Haberl, Ph.D., P.E. September 2011 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University...

  10. Regional Energy Baseline

    E-Print Network [OSTI]

    Kim, H.; Baltazar, J.C.; Haberl, J.

    ESL-TR-11-09-02 REGIONAL ENERGY BASELINE (1960 ~ 2009) 0 100 200 300 400 500 600 700 800 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 To tal En erg y U se pe r C ap ita (M MB tu) Year Total Energy... Use per Capita (1960-2009) US SEEC 12-States TX Hyojin Kim Juan-Carlos Baltazar, Ph.D. Jeff S. Haberl, Ph.D., P.E. September 2011 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University...

  11. The WITCHCRAFT Baseline Measurement and Pilot Project

    E-Print Network [OSTI]

    Utrecht, Universiteit

    for scholars and the general public to the folksong collection of Onder de Groene Linde, taking into account Groene Linde. · Theater Instituut Nederland (TIN), the owner of a large collection of written

  12. ITER Project Issues and Prognostication Historical Baseline

    E-Print Network [OSTI]

    budgets. Only advanced coal ("clean coal") programs fared reasonably well. In the late 1980s/early 1990s

  13. Hazard baseline documentation

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    This DOE limited technical standard establishes uniform Office of Environmental Management (EM) guidance on hazards baseline documents that identify and control radiological and nonradiological hazards for all EM facilities. It provides a road map to the safety and health hazard identification and control requirements contained in the Department`s orders and provides EM guidance on the applicability and integration of these requirements. This includes a definition of four classes of facilities (nuclear, non-nuclear, radiological, and other industrial); the thresholds for facility hazard classification; and applicable safety and health hazard identification, controls, and documentation. The standard applies to the classification, development, review, and approval of hazard identification and control documentation for EM facilities.

  14. Development Of Regional Climate Mitigation Baseline For A DominantAgro-Ecological Zone Of Karnataka, India

    SciTech Connect (OSTI)

    Sudha, P.; Shubhashree, D.; Khan, H.; Hedge, G.T.; Murthy, I.K.; Shreedhara, V.; Ravindranath, N.H.

    2007-06-01T23:59:59.000Z

    Setting a baseline for carbon stock changes in forest andland use sector mitigation projects is an essential step for assessingadditionality of the project. There are two approaches for settingbaselines namely, project-specific and regional baseline. This paperpresents the methodology adopted for estimating the land available formitigation, for developing a regional baseline, transaction cost involvedand a comparison of project-specific and regional baseline. The studyshowed that it is possible to estimate the potential land and itssuitability for afforestation and reforestation mitigation projects,using existing maps and data, in the dry zone of Karnataka, southernIndia. The study adopted a three-step approach for developing a regionalbaseline, namely: i) identification of likely baseline options for landuse, ii) estimation of baseline rates of land-use change, and iii)quantification of baseline carbon profile over time. The analysis showedthat carbon stock estimates made for wastelands and fallow lands forproject-specific as well as the regional baseline are comparable. Theratio of wasteland Carbon stocks of a project to regional baseline is1.02, and that of fallow lands in the project to regional baseline is0.97. The cost of conducting field studies for determination of regionalbaseline is about a quarter of the cost of developing a project-specificbaseline on a per hectare basis. The study has shown the reliability,feasibility and cost-effectiveness of adopting regional baseline forforestry sectormitigation projects.

  15. Updated Costs (June 2011 Basis) for Selected Bituminous Baseline...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Date:2011-Oct-17 Project: Bituminous Baseline Study Case: Case 1 GEE Radiant IGCC wo CO2 Plant Size: 622.1 MW,net Estimate Type: Conceptual Cost Base (Jun) 2011 (x1000) Acct...

  16. Baseline Control Measures.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J....

  17. Short Baseline Neutrino Oscillation Experiments

    E-Print Network [OSTI]

    Katori, Teppei

    2014-01-01T23:59:59.000Z

    Series of short baseline neutrino oscillation experiments provided unexpected results, and now they are called short baseline anomalies, and all indicates an existence of sterile neutrinos with a mass scale around 1~eV. The signals of short baseline anomalies are reported from 4 different classes of experiments. However, at this moment, there is no convincing theoretical model to explain such sterile neutrinos, and a single experiment to confirm 1~eV sterile neutrinos may be challenging. In this short note, we describe classes of short baseline neutrino oscillation experiments and their goals.

  18. 324 Building Baseline Radiological Characterization

    SciTech Connect (OSTI)

    R.J. Reeder, J.C. Cooper

    2010-06-24T23:59:59.000Z

    This report documents the analysis of radiological data collected as part of the characterization study performed in 1998. The study was performed to create a baseline of the radiological conditions in the 324 Building.

  19. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  20. Program cost and schedule baseline. Revision 5, (A00000000-00811-1701-00001)

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of Program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to chance control by the Executive (Level 0) and Program (Level 1) Baseline Change Control Boards (BCCBs) and establishes their baseline values. The Program technical baseline is contained in the Civilian Radioactive Waste Management System (CRWMS) Requirements Document (CRD) and the System Requirement Documents (SRDs) for the individual system elements. Changes to the PCSB will be approved by the Program Baseline Change Control Board (PBCCB). In addition to the PBCCB, the Energy System Acquisition Advisory Board Baseline Change Control Board (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project, the Waste Acceptance, Storage and Transportation (WAST) Project (formerly Monitored Retrievable Storage (MRS) Project), and Program Integration element.

  1. Facility stabilization project fiscal year 1997 multi-year work plan (MYWP) for WBS 7.1

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1996-09-01T23:59:59.000Z

    This document contains the technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year for the facility stabilization project.

  2. Automated baseline change detection phase I. Final report

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    The Automated Baseline Change Detection (ABCD) project is supported by the DOE Morgantown Energy Technology Center (METC) as part of its ER&WM cross-cutting technology program in robotics. Phase 1 of the Automated Baseline Change Detection project is summarized in this topical report. The primary objective of this project is to apply robotic and optical sensor technology to the operational inspection of mixed toxic and radioactive waste stored in barrels, using Automated Baseline Change Detection (ABCD), based on image subtraction. Absolute change detection is based on detecting any visible physical changes, regardless of cause, between a current inspection image of a barrel and an archived baseline image of the same barrel. Thus, in addition to rust, the ABCD system can also detect corrosion, leaks, dents, and bulges. The ABCD approach and method rely on precise camera positioning and repositioning relative to the barrel and on feature recognition in images. In support of this primary objective, there are secondary objectives to determine DOE operational inspection requirements and DOE system fielding requirements.

  3. Baseline LAW Glass Formulation Testing

    SciTech Connect (OSTI)

    Kruger, Albert A. [USDOE Office of River Protection, Richland, WA (United States); Mooers, Cavin [The Catholic University of America, Washington, DC (United States). Vitreous State Lab.; Bazemore, Gina [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Pegg, Ian L. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Hight, Kenneth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Lai, Shan Tao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Buechele, Andrew [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Rielley, Elizabeth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Gan, Hao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Muller, Isabelle S. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Cecil, Richard [The Catholic University of America, Washington, DC (United States). Vitreous State Lab

    2013-06-13T23:59:59.000Z

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  4. FED baseline engineering studies report

    SciTech Connect (OSTI)

    Sager, P.H.

    1983-04-01T23:59:59.000Z

    Studies were carried out on the FED Baseline to improve design definition, establish feasibility, and reduce cost. Emphasis was placed on cost reduction, but significant feasibility concerns existed in several areas, and better design definition was required to establish feasibility and provide a better basis for cost estimates. Design definition and feasibility studies included the development of a labyrinth shield ring concept to prevent radiation streaming between the torus spool and the TF coil cryostat. The labyrinth shield concept which was developed reduced radiation streaming sufficiently to permit contact maintenance of the inboard EF coils. Various concepts of preventing arcing between adjacent shield sectors were also explored. It was concluded that installation of copper straps with molybdenum thermal radiation shields would provide the most reliable means of preventing arcing. Other design studies included torus spool electrical/structural concepts, test module shielding, torus seismic response, poloidal conditions in the magnets, disruption characteristics, and eddy current effects. These additional studies had no significant impact on cost but did confirm the feasibility of the basic FED Baseline concept.

  5. TWRS privatization process technical baseline

    SciTech Connect (OSTI)

    Orme, R.M.

    1996-09-13T23:59:59.000Z

    The U.S. Department of Energy (DOE) is planning a two-phased program for the remediation of Hanford tank waste. Phase 1 is a pilot program to demonstrate the procurement of treatment services. The volume of waste treated during the Phase 1 is a small percentage of the tank waste. During Phase 2, DOE intends to procure treatment services for the balance of the waste. The TWRS Privatization Process Technical Baseline (PPTB) provides a summary level flowsheet/mass balance of tank waste treatment operations which is consistent with the tank inventory information, waste feed staging studies, and privatization guidelines currently available. The PPTB will be revised periodically as privatized processing concepts are crystallized.

  6. Pinellas Plant Environmental Baseline Report

    SciTech Connect (OSTI)

    Not Available

    1997-06-01T23:59:59.000Z

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  7. Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003

    E-Print Network [OSTI]

    Haberl, J. S.; Baltazar-Cervantes, J. C.; Liu, Z.; Claridge, D. E.; Turner, W. D.

    2003-01-01T23:59:59.000Z

    A&M University ABSTRACT This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project...

  8. Hazard Baseline Downgrade Effluent Treatment Facility

    SciTech Connect (OSTI)

    Blanchard, A.

    1998-10-21T23:59:59.000Z

    This Hazard Baseline Downgrade reviews the Effluent Treatment Facility, in accordance with Department of Energy Order 5480.23, WSRC11Q Facility Safety Document Manual, DOE-STD-1027-92, and DOE-EM-STD-5502-94. It provides a baseline grouping based on the chemical and radiological hazards associated with the facility. The Determination of the baseline grouping for ETF will aid in establishing the appropriate set of standards for the facility.

  9. Energy Intensity Baselining and Tracking Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more at betterbuildings.energy.gov Energy Intensity Baselining and Tracking Guidance i Preface The U.S. Department of Energy's (DOE's) Better Buildings, Better Plants Program...

  10. UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis

    E-Print Network [OSTI]

    Yamamoto, Keith

    UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis Final Issue Date: March 21, 2010 #12;Carbon Footprint Analysis Background This chapter of the Sustainability Assessment focuses on UCSF

  11. LTC vacuum blasting machine (metal): Baseline report

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  12. LTC vacuum blasting machine (concrete): Baseline report

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  13. Pentek metal coating removal system: Baseline report

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  14. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline; Revision 3

    SciTech Connect (OSTI)

    NONE

    1992-09-01T23:59:59.000Z

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project.

  15. Report of the DOE Review Committee on the baseline validation of the Superconducting Super Collider

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    The Secretary of Energy directed that an independent review of the current cost and schedule baseline for the SSC be conducted. The purpose of this independent review was to validate the current cost and schedule baseline and to ensure that the project status is accurate as currently reported. Through May 1993, approximately $1.5 billion of the baseline cost of $8.249 billion had been expended, with project completion forecasted on the baseline schedule as of September 1999. This report documents the findings of the SSC Baseline Validation Review Committee (the Committee). The report is organized into five parts. The first section is the Executive Summary. This introduction is followed by a discussion of the project progress/status as determined by the Committee. The next section describes the Committee`s estimate of the cost at completion for the SSC project, followed by an assessment of the adequacy of the business management systems currently being used to manage the project. The final section presents the Committee`s conclusions and recommendations. The main body of the report is followed by the subcommittee reports and appendices.

  16. US LHC Accelerator Project Baseline Change Request BCR Number 59

    E-Print Network [OSTI]

    Large Hadron Collider Program

    .5.1 US PM, 1.5.3 FNAL PM Title FNAL-LHC Rebaseline Change Control Level 2 Originator Jim Kerby Date 18 Request BCR Number 59 WBS 1.1.1 IR Quads, 1.1.3 DFBX, 1.5.1 US PM, 1.5.3 FNAL PM Title FNAL-LHC Rebaseline,447,621 ($938,509) 1.1.1.1 Tooling $2,328,448 $2,180,725 ($147,723) 1.1.1.2 Cold Mass $5,401,839 $5

  17. Multiproject baselines for evaluation of electric power projects

    E-Print Network [OSTI]

    2003-01-01T23:59:59.000Z

    simple load-duration curve (LDC) spreadsheet to calculatemarginal emissions rates. This LDC spreadsheet was evaluatedmodel, the simplified LDC spreadsheet, and the weighted

  18. Sandia Energy - Scaled Wind Farm Technology Facility Baselining Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol Home Distribution GridDocumentsInstitute of Advanced IndustrialSolarUnion

  19. Determining Baseline and Avoided Costs for UESC Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S H I E LGeothermal * August 2004

  20. Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials...

    Open Energy Info (EERE)

    Baselines and Reduction Potentials from Buildings Jump to: navigation, search Name Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Agency...

  1. Utilities and offsites design baseline. Outside Battery Limits Facility 6000 tpd SRC-I Demonstration Plant. Volume 1

    SciTech Connect (OSTI)

    None

    1984-05-25T23:59:59.000Z

    As part of the overall Solvent Refined Coal (SRC-1) project baseline being prepared by International Coal Refining Company (ICRC), the RUST Engineering Company is providing necessary input for the Outside Battery Limits (OSBL) Facilities. The project baseline is comprised of: design baseline - technical definition of work; schedule baseline - detailed and management level 1 schedules; and cost baseline - estimates and cost/manpower plan. The design baseline (technical definition) for the OSBL Facilities has been completed and is presented in Volumes I, II, III, IV, V and VI. The OSBL technical definition is based on, and compatible with, the ICRC defined statement of work, design basis memorandum, master project procedures, process and mechanical design criteria, and baseline guidance documents. The design basis memorandum is included in Paragraph 1.3 of Volume I. The baseline design data is presented in 6 volumes. Volume I contains the introduction section and utility systems data through steam and feedwater. Volume II continues with utility systems data through fuel system, and contains the interconnecting systems and utility system integration information. Volume III contains the offsites data through water and waste treatment. Volume IV continues with offsites data, including site development and buildings, and contains raw materials and product handling and storage information. Volume V contains wastewater treatment and solid wastes landfill systems developed by Catalytic, Inc. to supplement the information contained in Volume III. Volume VI contains proprietary information of Resources Conservation Company related to the evaporator/crystallizer system of the wastewater treatment area.

  2. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01T23:59:59.000Z

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  3. Fort Stewart integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Keller, J.M.; Sullivan, G.P.; Wahlstrom, R.R.; Larson, L.L.

    1993-08-01T23:59:59.000Z

    This report documents the assessment of baseline energy use at Fort Stewart, a US Army Forces Command facility located near Savannah, Georgia. This is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. PNL, in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), has designed a model program applicable to the federal sector for this purpose. The model program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Stewart. The analysis examines the characteristics of electric, natural gas, oil, propane, and wood chip use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Fort Stewart by building type, fuel type, and energy end use. A complete energy consumption reconciliation is presented that accounts for the distribution of all major energy uses and losses among buildings, utilities, and central systems.

  4. An Adaptive Kalman Filter for Removing Baseline Wandering in ECG

    E-Print Network [OSTI]

    Povinelli, Richard J.

    An Adaptive Kalman Filter for Removing Baseline Wandering in ECG Signals MA Mneimneh, EE Yaz, MT to baseline removal. This paper proposes an adaptive Kalman filter for the real time re- moval of baseline is used with an adaptive Kalman filter to estimate the state variables, including the baseline wandering

  5. Optimisation of future long baseline neutrino experiments

    E-Print Network [OSTI]

    Olga Mena

    2008-09-28T23:59:59.000Z

    The aim of this talk is to review near and far future long baseline neutrino experiments as superbeams, beta-Beams and neutrino factories, comparing their sensitivities to the unknown parameters in the neutrino oscillation sector. We focus on the extraction of the neutrino mass hierarchy, exploring alternatives to the commonly used neutrino-antineutrino comparison. Special attention to a new concept of neutrino factory design, the low energy neutrino factory, is given.

  6. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  7. Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01T23:59:59.000Z

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  8. Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002

    E-Print Network [OSTI]

    Haberl, J. S.; Baltazar, J. C.; Sung, Y. H.; Claridge, D. E.; Turner, W. D.

    ESL-TR-02/12-02 BASELINE REPORT FOR THE FORT HOOD ARMY BASE: SEPT. 1, 2001 TO AUG. 31, 2002 A Research Project for the U.S. Army C.E.R.L. and the Ft. Hood Energy Office Jeff S. Haberl, Ph.D., P.E. Juan...-Carlos Baltazar Cervantes Yong Hoon Sung David E. Claridge, Ph.D., P.E. W. Dan Turner, Ph.D., P.E. December 2002 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University System FT. HOOD BASELINE...

  9. SRP Baseline Hydrogeologic Investigation, Phase 3

    SciTech Connect (OSTI)

    Bledsoe, H.W.

    1988-08-01T23:59:59.000Z

    The SRP Baseline Hydrogeologic Investigation was implemented for the purpose of updating and improving the knowledge and understanding of the hydrogeologic systems underlying the SRP site. Phase III, which is discussed in this report, includes the drilling of 7 deep coreholes (sites P-24 through P-30) and the installation of 53 observation wells ranging in depth from approximately 50 ft to more than 970 ft below the ground surface. In addition to the collection of geologic cores for lithologic and stratigraphic study, samples were also collected for the determination of physical characteristics of the sediments and for the identification of microorganisms.

  10. SRP baseline hydrogeologic investigation, Phase 2

    SciTech Connect (OSTI)

    Bledsoe, H.W.

    1987-11-01T23:59:59.000Z

    As discussed in the program plan for the Savannah River Plant (SRP) Baseline Hydrogeologic Investigation, this program has been implemented for the purpose of updating and improving the current state of knowledge and understanding of the hydrogeologic systems underlying the Savannah River Plant (SRP). The objective of the program is to install a series of observation well clusters (wells installed in each major water bearing formation at the same site) at key locations across the plant site in order to: (1) provide detailed information on the lithology, stratigraphy, and groundwater hydrology, (2) provide observation wells to monitor the groundwater quality, head relationships, gradients, and flow paths.

  11. Baseline Wind Energy Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon, France:Barstow, California:Baseline Wind Energy

  12. California Baseline Energy Demands to 2050 for Advanced Energy Pathways

    E-Print Network [OSTI]

    McCarthy, Ryan; Yang, Christopher; Ogden, Joan M.

    2008-01-01T23:59:59.000Z

    ED2, September. CEC (2005b) Energy demand forecast methodsCalifornia Baseline Energy Demands to 2050 for Advancedof a baseline scenario for energy demand in California for a

  13. Electrochemistry Diagnostics of Baseline and New Materials

    Broader source: Energy.gov (indexed) [DOE]

    confidential, or otherwise restricted information Project ID ES033 OVERVIEW * LBNL carried out diagnostics in the ATD Program since its 1999 inception * ABRT Program...

  14. Fast flux test facility, transition project plan

    SciTech Connect (OSTI)

    Guttenberg, S.

    1994-11-15T23:59:59.000Z

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  15. Global Nuclear Energy Partnership Waste Treatment Baseline

    SciTech Connect (OSTI)

    Dirk Gombert; William Ebert; James Marra; Robert Jubin; John Vienna

    2008-05-01T23:59:59.000Z

    The Global Nuclear Energy Partnership program (GNEP) is designed to demonstrate a proliferation-resistant and sustainable integrated nuclear fuel cycle that can be commercialized and used internationally. Alternative stabilization concepts for byproducts and waste streams generated by fuel recycling processes were evaluated and a baseline of waste forms was recommended for the safe disposition of waste streams. Waste forms are recommended based on the demonstrated or expected commercial practicability and technical maturity of the processes needed to make the waste forms, and performance of the waste form materials when disposed. Significant issues remain in developing technologies to process some of the wastes into the recommended waste forms, and a detailed analysis of technology readiness and availability may lead to the choice of a different waste form than what is recommended herein. Evolving regulations could also affect the selection of waste forms.

  16. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flow sheet simulation (PFS) model. This report summarizes the activities completed during the period December 23, 1992 through March 15, 1992. In Task 1, Baseline Design and Alternates, the following activities related to the tradeoff studies were completed: approach and basis; oxygen purity; F-T reactor pressure; wax yield; autothermal reformer; hydrocarbons (C{sub 3}/C{sub 4}s) recovery; and hydrogenrecovery. In Task 3, Engineering Design Criteria, activities were initiated to support the process tradeoff studies in Task I and to develop the environmental strategy for the Illinois site. The work completed to date consists of the development of the F-T reactor yield correlation from the Mobil dam and a brief review of the environmental strategy prepared for the same site in the direct liquefaction baseline study.Some work has also been done in establishing site-related criteria, in establishing the maximum vessel diameter for train sizing and in coping with the low H{sub 2}/CO ratio from the Shell gasifier. In Task 7, Project Management and Administration, the following activities were completed: the subcontract agreement between Amoco and Bechtel was negotiated; a first technical progress meeting was held at the Bechtel office in February; and the final Project Management Plan was approved by PETC and issued in March 1992.

  17. Guide to Clean Development Mechanism Projects Related to Municipal...

    Open Energy Info (EERE)

    - Waste to Energy Topics: Implementation, Co-benefits assessment Resource Type: Guidemanual, Lessons learnedbest practices Website: www.unescap.orgesdenvironment...

  18. The LBNO long-baseline oscillation sensitivities with two conventional neutrino beams at different baselines

    E-Print Network [OSTI]

    :,; Agostino, L; Aittola, M; Alekou, A; Andrieu, B; Antoniou, F; Asfandiyarov, R; Autiero, D; Bésida, O; Balik, A; Ballett, P; Bandac, I; Banerjee, D; Bartmann, W; Bay, F; Biskup, B; Blebea-Apostu, A M; Blondel, A; Bogomilov, M; Bolognesi, S; Borriello, E; Brancus, I; Bravar, A; Buizza-Avanzini, M; Caiulo, D; Calin, M; Calviani, M; Campanelli, M; Cantini, C; Cata-Danil, G; Chakraborty, S; Charitonidis, N; Chaussard, L; Chesneanu, D; Chipesiu, F; Crivelli, P; Dawson, J; De Bonis, I; Declais, Y; Sanchez, P Del Amo; Delbart, A; Di Luise, S; Duchesneau, D; Dumarchez, J; Efthymiopoulos, I; Eliseev, A; Emery, S; Enqvist, T; Enqvist, K; Epprecht, L; Erykalov, A N; Esanu, T; Franco, D; Friend, M; Galymov, V; Gavrilov, G; Gendotti, A; Giganti, C; Gilardoni, S; Goddard, B; Gomoiu, C M; Gornushkin, Y A; Gorodetzky, P; Haesler, A; Hasegawa, T; Horikawa, S; Huitu, K; Izmaylov, A; Jipa, A; Kainulainen, K; Karadzhov, Y; Khabibullin, M; Khotjantsev, A; Kopylov, A N; Korzenev, A; Kosyanenko, S; Kryn, D; Kudenko, Y; Kuusiniemi, P; Lazanu, I; Lazaridis, C; Levy, J -M; Loo, K; Maalampi, J; Margineanu, R M; Marteau, J; Martin-Mari, C; Matveev, V; Mazzucato, E; Mefodiev, A; Mineev, O; Mirizzi, A; Mitrica, B; Murphy, S; Nakadaira, T; Narita, S; Nesterenko, D A; Nguyen, K; Nikolics, K; Noah, E; Novikov, Yu; Oprima, A; Osborne, J; Ovsyannikova, T; Papaphilippou, Y; Pascoli, S; Patzak, T; Pectu, M; Pennacchio, E; Periale, L; Pessard, H; Popov, B; Ravonel, M; Rayner, M; Resnati, F; Ristea, O; Robert, A; Rubbia, A; Rummukainen, K; Saftoiu, A; Sakashita, K; Sanchez-Galan, F; Sarkamo, J; Saviano, N; Scantamburlo, E; Sergiampietri, F; Sgalaberna, D; Shaposhnikova, E; Slupecki, M; Smargianaki, D; Stanca, D; Steerenberg, R; Sterian, A R; Sterian, P; Stoica, S; Strabel, C; Suhonen, J; Suvorov, V; Toma, G; Tonazzo, A; Trzaska, W H; Tsenov, R; Tuominen, K; Valram, M; Vankova-Kirilova, G; Vannucci, F; Vasseur, G; Velotti, F; Velten, P; Venturi, V; Viant, T; Vihonen, S; Vincke, H; Vorobyev, A; Weber, A; Wu, S; Yershov, N; Zambelli, L; Zito, M

    2014-01-01T23:59:59.000Z

    The proposed Long Baseline Neutrino Observatory (LBNO) initially consists of $\\sim 20$ kton liquid double phase TPC complemented by a magnetised iron calorimeter, to be installed at the Pyh\\"asalmi mine, at a distance of 2300 km from CERN. The conventional neutrino beam is produced by 400 GeV protons accelerated at the SPS accelerator delivering 700 kW of power. The long baseline provides a unique opportunity to study neutrino flavour oscillations over their 1st and 2nd oscillation maxima exploring the $L/E$ behaviour, and distinguishing effects arising from $\\delta_{CP}$ and matter. In this paper we show how this comprehensive physics case can be further enhanced and complemented if a neutrino beam produced at the Protvino IHEP accelerator complex, at a distance of 1160 km, and with modest power of 450 kW is aimed towards the same far detectors. We show that the coupling of two independent sub-MW conventional neutrino and antineutrino beams at different baselines from CERN and Protvino will allow to measure ...

  19. Arc melter demonstration baseline test results

    SciTech Connect (OSTI)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O`Connor, W.K.; Turner, P.C.

    1994-07-01T23:59:59.000Z

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process.

  20. SRS baseline hydrogeologic investigation: Summary report

    SciTech Connect (OSTI)

    Bledsoe, H.W.; Aadland, R.K. (Westinghouse Savannah River Co., Aiken, SC (United States)); Sargent, K.A. (Furman Univ., Greenville, SC (United States). Dept. of Geology)

    1990-11-01T23:59:59.000Z

    Work on the Savannah River Site (SRS) Baseline Hydrogeologic Investigation began in 1983 when it was determined that the knowledge of the plant hydrogeologic systems needed to be expanded and improved in response to changing stratigraphic and hydrostratigraphic terminology and increased involvement by regulatory agencies (Bledsoe, 1984). Additionally, site-wide data were needed to determine flow paths, gradients, and velocities associated with the different aquifers underlying the plant site. The program was divided into three phases in order to allow the results of one phase to be evaluated and necessary changes and improvements incorporated into the following phases. This report summarizes the results of all three phases and includes modified graphic logs, lithologic descriptions of the different geologic formations, profiles of each cluster site, hydrostratigraphic cross sections, hydrographs of selected wells within each cluster for the first full year of uninterrupted water level measurements, potentiometric maps developed from data collected from all clusters, completion diagrams for each well, and a summary of laboratory tests. Additionally, the proposed new classification of hydrostratigraphic units at SRS (Aadland and Bledsoe, 1990) has been incorporated.

  1. Renewable Diesel from Algal Lipis: An Integrated Baseline for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to establish an "integrated baseline" by harmonizing and combining the Program's national resource assessment (RA), techno-economic analysis (TEA), and life-cycle analysis (LCA)...

  2. EA-1943: Long Baseline Neutrino Facility/Deep Underground Neutrino...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DUNE) at Fermilab, Batavia, Illinois and the Sanford Underground Research Facility, Lead, South Dakota EA-1943: Long Baseline Neutrino FacilityDeep Underground Neutrino...

  3. U.S. Department of Energy Performance Baseline Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12T23:59:59.000Z

    The guide supports DOE O 413.3A and identifies key performance baseline development processes and practices. Does not cancel other directives.

  4. Cost and Performance Baseline for Fossil Energy Plants Volume...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 3 July 6, 2015 DOENETL-20151723 OFFICE OF FOSSIL ENERGY National Energy Technology Laboratory Cost and Performance Baseline for Fossil Energy Plants Volume 1: Revision...

  5. Seismic baseline and induction studies- Roosevelt Hot Springs...

    Open Energy Info (EERE)

    Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Seismic baseline and induction studies- Roosevelt Hot Springs, Utah and Raft River, Idaho...

  6. Pentek metal coating removal system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  7. Ultra-high pressure water jet: Baseline report

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The ultra-high pressure waterjet technology was being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The ultra-high pressure waterjet technology acts as a cutting tool for the removal of surface substrates. The Husky{trademark} pump feeds water to a lance that directs the high pressure water at the surface to be removed. The safety and health evaluation during the testing demonstration focused on two main areas of exposure. These were dust and noise. The dust exposure was found to be minimal, which would be expected due to the wet environment inherent in the technology, but noise exposure was at a significant level. Further testing for noise is recommended because of the outdoor environment where the testing demonstration took place. In addition, other areas of concern found were arm-hand vibration, ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, fall hazards, slipping hazards, hazards associated with the high pressure water, and hazards associated with air pressure systems.

  8. LTC vacuum blasting maching (concrete): Baseline report: Greenbook (Chapter)

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjuction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  9. Pentek concrete scabbling system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek scabbling technology was tested at Florida International University (FIU) and is being evaluated as a baseline technology. This report evaluates it for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek concrete scabbling system consisted of the MOOSE, SQUIRREL-I, and SQUIRREL-III scabblers. The scabblers are designed to scarify concrete floors and slabs using cross-section, tungsten carbide tipped bits. The bits are designed to remove concrete in 318 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation conducted during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each of these exposures is recommended. Because of the outdoor environment where the testing demonstration took place, results may be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed operating environment. Other areas of concern were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  10. LTC vacuum blasting machine (metal) baseline report: Greenbook (chapter)

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  11. A SURVEY OF ASTRONOMICAL RESEARCH: A BASELINE FOR ASTRONOMICAL DEVELOPMENT

    SciTech Connect (OSTI)

    Ribeiro, V. A. R. M. [Astrophysics, Cosmology and Gravity Centre, Department of Astronomy, University of Cape Town, Private Bag X3, Rondebosch 7701 (South Africa); Russo, P. [EU Universe Awareness, Leiden Observatory, Leiden University, PO 9513 Leiden, 2300 RA (Netherlands); Cárdenas-Avendaño, A., E-mail: vribeiro@ast.uct.ac.za, E-mail: russo@strw.leidenuniv.nl [Departamento de Física, Universidad Nacional de Colombia, Carrera 45 No 26-85, Edificio Gutierréz, Bogotá, DC (Colombia)

    2013-12-01T23:59:59.000Z

    Measuring scientific development is a difficult task. Different metrics have been put forward to evaluate scientific development; in this paper we explore a metric that uses the number of peer-reviewed, and when available non-peer-reviewed, research articles as an indicator of development in the field of astronomy. We analyzed the available publication record, using the Smithsonian Astrophysical Observatory/NASA Astrophysics Database System, by country affiliation in the time span between 1950 and 2011 for countries with a gross national income of less than 14,365 USD in 2010. This represents 149 countries. We propose that this metric identifies countries in ''astronomical development'' with a culture of research publishing. We also propose that for a country to develop in astronomy, it should invest in outside expert visits, send its staff abroad to study, and establish a culture of scientific publishing. Furthermore, we propose that this paper may be used as a baseline to measure the success of major international projects, such as the International Year of Astronomy 2009.

  12. Scientific Opportunities with the Long-Baseline Neutrino Experiment

    SciTech Connect (OSTI)

    Adams, C.; et al.,

    2013-07-28T23:59:59.000Z

    In this document, we describe the wealth of science opportunities and capabilities of LBNE, the Long-Baseline Neutrino Experiment. LBNE has been developed to provide a unique and compelling program for the exploration of key questions at the forefront of particle physics. Chief among the discovery opportunities are observation of CP symmetry violation in neutrino mixing, resolution of the neutrino mass hierarchy, determination of maximal or near-maximal mixing in neutrinos, searches for nucleon decay signatures, and detailed studies of neutrino bursts from galactic supernovae. To fulfill these and other goals as a world-class facility, LBNE is conceived around four central components: (1) a new, intense wide-band neutrino source at Fermilab, (2) a fine-grained `near' neutrino detector just downstream of the source, (3) the Sanford Underground Research Facility (SURF) in Lead, South Dakota at an optimal distance (~1300 km) from the neutrino source, and (4) a massive liquid argon time-projection chamber (LArTPC) deployed there as a 'far' detector. The facilities envisioned are expected to enable many other science opportunities due to the high event rates and excellent detector resolution from beam neutrinos in the near detector and atmospheric neutrinos in the far detector. This is a mature, well developed, world class experiment whose relevance, importance, and probability of unearthing critical and exciting physics has increased with time.

  13. The LBNO long-baseline oscillation sensitivities with two conventional neutrino beams at different baselines

    E-Print Network [OSTI]

    LAGUNA-LBNO Collaboration; :; S. K. Agarwalla; L. Agostino; M. Aittola; A. Alekou; B. Andrieu; F. Antoniou; R. Asfandiyarov; D. Autiero; O. Bésida; A. Balik; P. Ballett; I. Bandac; D. Banerjee; W. Bartmann; F. Bay; B. Biskup; A. M. Blebea-Apostu; A. Blondel; M. Bogomilov; S. Bolognesi; E. Borriello; I. Brancus; A. Bravar; M. Buizza-Avanzini; D. Caiulo; M. Calin; M. Calviani; M. Campanelli; C. Cantini; G. Cata-Danil; S. Chakraborty; N. Charitonidis; L. Chaussard; D. Chesneanu; F. Chipesiu; P. Crivelli; J. Dawson; I. De Bonis; Y. Declais; P. Del Amo Sanchez; A. Delbart; S. Di Luise; D. Duchesneau; J. Dumarchez; I. Efthymiopoulos; A. Eliseev; S. Emery; T. Enqvist; K. Enqvist; L. Epprecht; A. N. Erykalov; T. Esanu; D. Franco; M. Friend; V. Galymov; G. Gavrilov; A. Gendotti; C. Giganti; S. Gilardoni; B. Goddard; C. M. Gomoiu; Y. A. Gornushkin; P. Gorodetzky; A. Haesler; T. Hasegawa; S. Horikawa; K. Huitu; A. Izmaylov; A. Jipa; K. Kainulainen; Y. Karadzhov; M. Khabibullin; A. Khotjantsev; A. N. Kopylov; A. Korzenev; S. Kosyanenko; D. Kryn; Y. Kudenko; P. Kuusiniemi; I. Lazanu; C. Lazaridis; J. -M. Levy; K. Loo; J. Maalampi; R. M. Margineanu; J. Marteau; C. Martin-Mari; V. Matveev; E. Mazzucato; A. Mefodiev; O. Mineev; A. Mirizzi; B. Mitrica; S. Murphy; T. Nakadaira; S. Narita; D. A. Nesterenko; K. Nguyen; K. Nikolics; E. Noah; Yu. Novikov; A. Oprima; J. Osborne; T. Ovsyannikova; Y. Papaphilippou; S. Pascoli; T. Patzak; M. Pectu; E. Pennacchio; L. Periale; H. Pessard; B. Popov; M. Ravonel; M. Rayner; F. Resnati; O. Ristea; A. Robert; A. Rubbia; K. Rummukainen; A. Saftoiu; K. Sakashita; F. Sanchez-Galan; J. Sarkamo; N. Saviano; E. Scantamburlo; F. Sergiampietri; D. Sgalaberna; E. Shaposhnikova; M. Slupecki; D. Smargianaki; D. Stanca; R. Steerenberg; A. R. Sterian; P. Sterian; S. Stoica; C. Strabel; J. Suhonen; V. Suvorov; G. Toma; A. Tonazzo; W. H. Trzaska; R. Tsenov; K. Tuominen; M. Valram; G. Vankova-Kirilova; F. Vannucci; G. Vasseur; F. Velotti; P. Velten; V. Venturi; T. Viant; S. Vihonen; H. Vincke; A. Vorobyev; A. Weber; S. Wu; N. Yershov; L. Zambelli; M. Zito

    2014-12-02T23:59:59.000Z

    The proposed Long Baseline Neutrino Observatory (LBNO) initially consists of $\\sim 20$ kton liquid double phase TPC complemented by a magnetised iron calorimeter, to be installed at the Pyh\\"asalmi mine, at a distance of 2300 km from CERN. The conventional neutrino beam is produced by 400 GeV protons accelerated at the SPS accelerator delivering 700 kW of power. The long baseline provides a unique opportunity to study neutrino flavour oscillations over their 1st and 2nd oscillation maxima exploring the $L/E$ behaviour, and distinguishing effects arising from $\\delta_{CP}$ and matter. In this paper we show how this comprehensive physics case can be further enhanced and complemented if a neutrino beam produced at the Protvino IHEP accelerator complex, at a distance of 1160 km, and with modest power of 450 kW is aimed towards the same far detectors. We show that the coupling of two independent sub-MW conventional neutrino and antineutrino beams at different baselines from CERN and Protvino will allow to measure CP violation in the leptonic sector at a confidence level of at least $3\\sigma$ for 50\\% of the true values of $\\delta_{CP}$ with a 20 kton detector. With a far detector of 70 kton, the combination allows a $3\\sigma$ sensitivity for 75\\% of the true values of $\\delta_{CP}$ after 10 years of running. Running two independent neutrino beams, each at a power below 1 MW, is more within today's state of the art than the long-term operation of a new single high-energy multi-MW facility, which has several technical challenges and will likely require a learning curve.

  14. Nanoparticle-Coated Chemiresistors with CMOS Baseline Tracking and Cancellation

    E-Print Network [OSTI]

    Mason, Andrew

    Nanoparticle-Coated Chemiresistors with CMOS Baseline Tracking and Cancellation D. Rairigh, G Abstract-- Chemiresistors (CR) with thiolate-monolayer- protected gold nanoparticle (MPN) interfacial for multi-VOC monitoring. This paper presents a new baseline cancellation and tracking system for MPN-coated

  15. THE BASELINE POSITRON PRODUCTION AND CAPTURE SCHEME FOR CLIC

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    THE BASELINE POSITRON PRODUCTION AND CAPTURE SCHEME FOR CLIC O. Dadoun , I. Chaikovska, P. Lepercq chan- neling as the baseline for unpolarised positron production. The hybrid source uses a few GeV electron beam imping- ing on a tungsten crystal target. With the crystal oriented on its axis

  16. Baseline System Costs for 50.0 MW Enhanced Geothermal System--A Function of: Working Fluid, Technology, and Location, Location, Location

    Broader source: Energy.gov [DOE]

    Project objectives: Develop a baseline cost model of a 50.0 MW Enhanced Geothermal System, including all aspects of the project, from finding the resource through to operation, for a particularly challenging scenario: the deep, radioactively decaying granitic rock of the Pioneer Valley in Western Massachusetts.

  17. Fast Flux Test Facility project plan. Revision 2

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1995-11-01T23:59:59.000Z

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  18. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    This baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado, evaluates potential public health and environmental impacts resulting from ground water contamination at the former North Continent (NC) and Union Carbide (UC) uranium mill processing sites. The tailings at these sites will be placed in a disposal cell at the proposed Burro Canyon, Colorado, site. The US Department of Energy (DOE) anticipates the start of the first phase remedial action by the spring of 1995 under the direction of the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project will evaluate ground water contamination. This baseline risk assessment is the first site-specific document for these sites under the Ground Water Project. It will help determine the compliance strategy for contaminated ground water at the site. In addition, surface water and sediment are qualitatively evaluated in this report.

  19. Sterile Neutrino Fits to Short-Baseline Neutrino Oscillation Measurements

    E-Print Network [OSTI]

    Conrad, J. M.

    2013-01-01T23:59:59.000Z

    This paper reviews short-baseline oscillation experiments as interpreted within the context of one, two, and three sterile neutrino models associated with additional neutrino mass states in the ~1?eV range. Appearance and ...

  20. Instrument validation project

    SciTech Connect (OSTI)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01T23:59:59.000Z

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  1. Project W-420 stack monitoring system upgrades

    SciTech Connect (OSTI)

    CARPENTER, K.E.

    1999-02-25T23:59:59.000Z

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  2. Way to increase the user access at the LCLS baseline

    E-Print Network [OSTI]

    Geloni, Gianluca; Saldin, Evgeni

    2010-01-01T23:59:59.000Z

    The LCLS beam is meant for a single user, but the baseline undulator is long enough to serve two users simultaneously. To this end, we propose a setup composed of two elements: an X-ray mirrors pair for X-ray beam deflection, and a 4 m-long magnetic chicane, which creates an offset for mirrors pair installation in the middle of the baseline undulator. The insertable mirrors pair can separate spatially the X-ray beams generated in the first and in the second half of the baseline undulator. Rapid switching of the FEL amplification process allows deactivating one half and activating another half of the undulator. As proposed elsewhere, using a kicker installed upstream of the LCLS baseline undulator and an already existing corrector in the first half of the undulator, it is possible to rapidly switch the X-ray beam from one user to another. We present simulation results for the LCLS baseline, and show that it is possible to generate two saturated SASE X-ray beams in the whole 0.8-8 keV photon energy range in the...

  3. Functional Testing Protocols for Commercial Building Efficiency Baseline Modeling Software

    SciTech Connect (OSTI)

    Jump, David; Price, Phillip N.; Granderson, Jessica; Sohn, Michael

    2013-09-06T23:59:59.000Z

    This document describes procedures for testing and validating proprietary baseline energy modeling software accuracy in predicting energy use over the period of interest, such as a month or a year. The procedures are designed according to the methodology used for public domain baselining software in another LBNL report that was (like the present report) prepared for Pacific Gas and Electric Company: ?Commercial Building Energy Baseline Modeling Software: Performance Metrics and Method Testing with Open Source Models and Implications for Proprietary Software Testing Protocols? (referred to here as the ?Model Analysis Report?). The test procedure focuses on the quality of the software?s predictions rather than on the specific algorithms used to predict energy use. In this way the software vendor is not required to divulge or share proprietary information about how their software works, while enabling stakeholders to assess its performance.

  4. 200-BP-5 operable unit Technical Baseline report

    SciTech Connect (OSTI)

    Jacques, I.D.; Kent, S.K.

    1991-10-01T23:59:59.000Z

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted.

  5. Robins Air Force Base Integrated Resource Assessment. Volume 2, Baseline Detail

    SciTech Connect (OSTI)

    Keller, J.M.; Sullivan, G.P.; Wahlstrom, R.R.; Larson, L.L.

    1993-08-01T23:59:59.000Z

    This report documents the assessment of baseline energy use at Robins Air Force Base (AFB), a US Air Force Materiel Command facility located near Macon, Georgia. This is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Air Force Materiel Command (AFMC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Robins AFB. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Robins AFB. The analysis examines the characteristics of electric, natural gas, oil, propane, and wood chip use for fiscal year 1991. The results include energy-use intensities for the facilities at Robins AFB by building type, fuel type, and energy end use. A complete energy consumption reconciliation is presented that accounts for the distribution of all major energy uses and losses among buildings, utilities, and central systems.

  6. Uncertainty in Clean Development Mechanism Baselines: Sources, Ramifications, and Negotiations

    E-Print Network [OSTI]

    Bushey, Douglas

    2005-01-01T23:59:59.000Z

    project.   For example, if a wind farm project is  expected energy  generation  from  a  wind  farm  which  are,  in 

  7. Development of Baseline Monthly Utility Models for Fort Hood, Texas

    E-Print Network [OSTI]

    Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.; Chalifoux, A.

    1996-01-01T23:59:59.000Z

    /evaluate the extent to which Presidential Executive Order 12902, mandating 30% decrease in energy utility bills from 1985 to 2005, is being met. In this analysis, 1990 has been selected as the baseline year to illustrate the predictive capability of the models. Since...

  8. BASELINE DESIGN/ECONOMICS FOR ADVANCED FISCHER-TROPSCH TECHNOLOGY

    SciTech Connect (OSTI)

    None

    1998-04-01T23:59:59.000Z

    Bechtel, along with Amoco as the main subcontractor, developed a Baseline design, two alternative designs, and computer process simulation models for indirect coal liquefaction based on advanced Fischer-Tropsch (F-T) technology for the U. S. Department of Energy's (DOE's) Federal Energy Technology Center (FETC).

  9. A baseline characterization of trace elements in Texas soils

    E-Print Network [OSTI]

    Frybarger, Mary Rita

    1998-01-01T23:59:59.000Z

    A baseline survey of concentrations of Mn, Fe, Zn, Cu, Se, As, Cd, Cr, Co, Pb, Ba, and Ni was performed for 100 soils from seven Land Resource Areas of Texas. Nearly 300 soil samples from the upper, middle, and lower depths of selected pedons were...

  10. Historical forest baselines reveal potential for continued carbon sequestration

    E-Print Network [OSTI]

    Mladenoff, David

    Historical forest baselines reveal potential for continued carbon sequestration Jeanine M-based studies suggest that land-use history is a more important driver of carbon sequestration in these systems agricultural lands are being promoted as important avenues for future carbon sequestration (8). But the degree

  11. Understanding the Effect of Baseline Modeling Implementation Choices on

    E-Print Network [OSTI]

    . Mathieu Power Systems Laboratory ETH Z¨urich Zurich, Switzerland Email: jmathieu@eeh.ee.ethz.ch Sila electric load against counterfactual predictions made using statistical base- line models. Many baseline build- ings to become active participants in power system operations [1]. In traditional demand response

  12. Development of Baseline Monthly Utility Models for Fort Hood, Texas 

    E-Print Network [OSTI]

    Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.; Chalifoux, A.

    1996-01-01T23:59:59.000Z

    /evaluate the extent to which Presidential Executive Order 12902, mandating 30% decrease in energy utility bills from 1985 to 2005, is being met. In this analysis, 1990 has been selected as the baseline year to illustrate the predictive capability of the models. Since...

  13. New baseline for the magnet cooling system Yury Ivanyushenkov

    E-Print Network [OSTI]

    McDonald, Kirk

    1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory #12;2 Liquid nitrogen cooling system: Conceptual points · Magnet the magnet as a stand alone system. #12;3 Liquid nitrogen cooling system: Diagram Drawn by Peter Titus #12

  14. An Overview of the 2014 ALMA Long Baseline Campaign

    E-Print Network [OSTI]

    Partnership, ALMA; Vlahakis, C; Corder, S; Remijan, A; Barkats, D; Lucas, R; Hunter, T R; Brogan, C L; Asaki, Y; Matsushita, S; Dent, W R F; Hills, R E; Phillips, N; Richards, A M S; Cox, P; Amestica, R; Broguiere, D; Cotton, W; Hales, A S; Hiriart, R; Hirota, A; Hodge, J A; Impellizzeri, C M V; Kern, J; Kneissl, R; Liuzzo, E; Marcelino, N; Marson, R; Mignano, A; Nakanishi, K; Nikolic, B; Perez, J E; Pérez, L M; Toledo, I; Aladro, R; Butler, B; Cortes, J; Cortes, P; Dhawan, V; Di Francesco, J; Espada, D; Galarza, F; Garcia-Appadoo, D; Guzman-Ramirez, L; Humphreys, E M; Jung, T; Kameno, S; Laing, R A; Leon, S; Mangum, J; Marconi, G; Nagai, H; Nyman, L -A; Perley, R; Radiszcz, M; Rodón, J A; Sawada, T; Takahashi, S; Tilanus, R P J; van Kempen, T; Vilaro, B Vila; Watson, L C; Wiklind, T; Gueth, F; Tatematsu, K; Wootten, A; Castro-Carrizo, A; Chapillon, E; Dumas, G; de Gregorio-Monsalvo, I; Francke, H; Gallardo, J; Garcia, J; Gonzalez, S; Hibbard, J E; Hill, T; Kaminski, T; Karim, A; Krips, M; Kurono, Y; Lopez, C; Martin, S; Maud, L; Morales, F; Pietu, V; Plarre, K; Schieven, G; Testi, L; Videla, L; Villard, E; Whyborn, N; Zwaan, M A; Alves, F; Andreani, P; Avison, A; Barta, M; Bedosti, F; Bendo, G J; Bertoldi, F; Bethermin, M; Biggs, A; Boissier, J; Brand, J; Burkutean, S; Casasola, V; Conway, J; Cortese, L; Dabrowski, B; Davis, T A; Trigo, M Diaz; Fontani, F; Franco-Hernandez, R; Fuller, G; Madrid, R Galvan; Giannetti, A; Ginsburg, A; Graves, S F; Hatziminaoglou, E; Hogerheijde, M; Jachym, P; Serra, I Jimenez; Karlicky, M; Klaasen, P; Kraus, M; Kunneriath, D; Lagos, C; Longmore, S; Leurini, S; Maercker, M; Magnelli, B; Vidal, I Marti; Massardi, M; Maury, A; Muehle, S; Muller, S; Muxlow, T; O'Gorman, E; Paladino, R; Petry, D; Pineda, J; Randall, S; Richer, J S; Rossetti, A; Rushton, A; Rygl, K; Monge, A Sanchez; Schaaf, R; Schilke, P; Stanke, T; Schmalzl, M; Stoehr, F; Urban, S; van Kampen, E; Vlemmings, W; Wang, K; Wild, W; Yang, Y; Iguchi, S; Hasegawa, T; Saito, M; Inatani, J; Mizuno, N; Asayama, S; Kosugi, G; Morita, K -I; Chiba, K; Kawashima, S; Okumura, S K; Ohashi, N; Ogasawara, R; Sakamoto, S; Noguchi, T; Huang, Y -D; Liu, S -Y; Kemper, F; Koch, P M; Chen, M -T; Chikada, Y; Hiramatsu, M; Iono, D; Shimojo, M; Komugi, S; Kim, J; Lyo, A -R; Muller, E; Herrera, C; Miura, R E; Ueda, J; Chibueze, J; Su, Y -N; Trejo-Cruz, A; Wang, K -S; Kiuchi, H; Ukita, N; Sugimoto, M; Kawabe, R; Hayashi, M; Miyama, S; Ho, P T P; Kaifu, N; Ishiguro, M; Beasley, A J; Bhatnagar, S; Braatz, J A; Brisbin, D G; Brunetti, N; Carilli, C; Crossley, J H; D'Addario, L; Meyer, J L Donovan; Emerson, D T; Evans, A S; Fisher, P; Golap, K; Griffith, D M; Hale, A E; Halstead, D; Hardy, E J; Hatz, M C; Holdaway, M; Indebetouw, R; Jewell, P R; Kepley, A A; Kim, D -C; Lacy, M D; Leroy, A K; Liszt, H S; Lonsdale, C J; Matthews, B; McKinnon, M; Mason, B S; Moellenbrock, G; Moullet, A; Myers, S T; Ott, J; Peck, A B; Pisano, J; Radford, S J E; Randolph, W T; Venkata, U Rao; Rawlings, M; Rosen, R; Schnee, S L; Scott, K S; Sharp, N K; Sheth, K J; Simon, R S; Tsutsumi, T; Wood, S J

    2015-01-01T23:59:59.000Z

    A major goal of the Atacama Large Millimeter/submillimeter Array (ALMA) is to make accurate images with resolutions of tens of milliarcseconds, which at submillimeter (submm) wavelengths requires baselines up to ~15 km. To develop and test this capability, a Long Baseline Campaign (LBC) was carried out from September to late November 2014, culminating in end-to-end observations, calibrations, and imaging of selected Science Verification (SV) targets. This paper presents an overview of the campaign and its main results, including an investigation of the short-term coherence properties and systematic phase errors over the long baselines at the ALMA site, a summary of the SV targets and observations, and recommendations for science observing strategies at long baselines. Deep ALMA images of the quasar 3C138 at 97 and 241 GHz are also compared to VLA 43 GHz results, demonstrating an agreement at a level of a few percent. As a result of the extensive program of LBC testing, the highly successful SV imaging at long...

  15. Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment

    SciTech Connect (OSTI)

    Brodrick, J.R. (USDOE, Washington, DC (United States)); Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A. (Pacific Northwest Lab., Richland, WA (United States))

    1993-02-01T23:59:59.000Z

    The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort's electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils [number sign]2 and [number sign]6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort.

  16. Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment

    SciTech Connect (OSTI)

    Brodrick, J.R. [USDOE, Washington, DC (United States); Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A. [Pacific Northwest Lab., Richland, WA (United States)

    1993-02-01T23:59:59.000Z

    The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort`s electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils {number_sign}2 and {number_sign}6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort.

  17. Manual for Quantitative Evaluation of the Co-Benefits Approach...

    Open Energy Info (EERE)

    Energy User Interface: Other ComplexityEase of Use: Simple Website: www.env.go.jpenearthccmanualqecba.pdf Cost: Free Related Tools SimCLIM World Induced Technical Change...

  18. Predictable SCR co-benefits for mercury control

    SciTech Connect (OSTI)

    Pritchard, S. [Cormtech Inc. (USA)

    2009-01-15T23:59:59.000Z

    A test program, performed in cooperation with Dominion Power and the Babcock and Wilcox Co., was executed at Dominion Power's Mount Storm power plant in Grant County, W. Va. The program was focused on both the selective catalytic reduction (SCR) catalyst capability to oxide mercury as well as the scrubber's capability to capture and retain the oxidized mercury. This article focuses on the SCR catalyst performance aspects. The Mount Storm site consists of three units totaling approximately 1,660 MW. All units are equipped with SCR systems for NOx control. A full-scale test to evaluate the effect of the SCR was performed on Unit 2, a 550 MWT-fired boiler firing a medium sulfur bituminous coal. This test program demonstrated that the presence of an SCR catalyst can significantly affect the mercury speciation profile. Observation showed that in the absence of an SCR catalyst, the extent of oxidation of element a mercury at the inlet of the flue gas desulfurization system was about 64%. The presence of a Cornertech SCR catalyst improved this oxidation to levels greater than 95% almost all of which was captured by the downstream wet FGD system. Cornertech's proprietary SCR Hg oxidation model was used to accurately predict the field results. 1 ref., 2 figs., 1 tab.

  19. Mainstreaming Transport Co-benefits Approach: A Guide to Evaluating

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:LandownersLuther,Jemez Pueblo Area (DOE GTP)Texas:MSMLBeam(m) 2.4

  20. Carbon Supply and Co-Benefits Analysis | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LPInformation 8thCalwind IICaneyNW1 8LH Sector: Jump to:

  1. Asian Co-benefits Partnership (ACP) Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in Carbon Capture andsoftwareAsian Age Enterprise Ltd

  2. Baseline ecological risk assessment Salmon Site, Lamar County, Mississippi

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    The Salmon Site (SS), formerly the Tatum Dome Test Site, located in Mississippi was the site of two nuclear and two gas explosion tests conducted between 1964 and 1970. A consequence of these testing activities is that radionuclides were released into the salt dome, where they are presently contained. During reentry drilling and other site activities, incidental liquid and solid wastes that contained radioactivity were generated, resulting in some soil, ground water and equipment contamination. As part of the remedial investigation effort, a Baseline Ecological Risk Assessment was conducted at the SS. The purpose is to gauge ecological and other environmental impacts attributable to past activities at the former test facility. The results of this facility-specific baseline risk assessment are presented in this document.

  3. Kalispel Resident Fish Project Annual Report, 2003.

    SciTech Connect (OSTI)

    Olson, Jason; Andersen, Todd

    2004-04-01T23:59:59.000Z

    In 2003 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2003, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented.

  4. Kalispel Resident Fish Project : Annual Report, 2002.

    SciTech Connect (OSTI)

    Andersen, Todd; Olson, Jason

    2003-03-01T23:59:59.000Z

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  5. Integrated Baseline System (IBS) Version 2.0: User guide

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, WA (United States); Burford, M.J.; Downing, T.R.; Matsumoto, S.W.; Schrank, E.E.; Williams, J.R.; Winters, C.; Wood, B.M.

    1994-03-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the Federal Emergency Management Agency. This User Guide explains how to start and use the IBS Program, which is designed to help civilian emergency management personnel to plan for and support their responses to a chemical-releasing event at a military chemical stockpile. The intended audience for this document is all users of the IBS, especially emergency management planners and analysts.

  6. Hybrid Electric Vehicle Fleet and Baseline Performance Testing

    SciTech Connect (OSTI)

    J. Francfort; D. Karner

    2006-04-01T23:59:59.000Z

    The U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA) conducts baseline performance and fleet testing of hybrid electric vehicles (HEV). To date, the AVTA has completed baseline performance testing on seven HEV models and accumulated 1.4 million fleet testing miles on 26 HEVs. The HEV models tested or in testing include: Toyota Gen I and Gen II Prius, and Highlander; Honda Insight, Civic and Accord; Chevrolet Silverado; Ford Escape; and Lexus RX 400h. The baseline performance testing includes dynamometer and closed track testing to document the HEV’s fuel economy (SAE J1634) and performance in a controlled environment. During fleet testing, two of each HEV model are driven to 160,000 miles per vehicle within 36 months, during which maintenance and repair events, and fuel use is recorded and used to compile life-cycle costs. At the conclusion of the 160,000 miles of fleet testing, the SAE J1634 tests are rerun and each HEV battery pack is tested. These AVTA testing activities are conducted by the Idaho National Laboratory, Electric Transportation Applications, and Exponent Failure Analysis Associates. This paper discusses the testing methods and results.

  7. California Baseline Energy Demands to 2050 for Advanced Energy Pathways

    E-Print Network [OSTI]

    McCarthy, Ryan; Yang, Christopher; Ogden, Joan M.

    2008-01-01T23:59:59.000Z

    residential electricity consumption include disaggregationfor annual residential electricity consumption through 2050.Saturation and unit electricity consumption are projected

  8. Projecting net incomes for Texas crop producers: an application of probabilistic forecasting

    E-Print Network [OSTI]

    Eggerman, Christopher Ryan

    2006-10-30T23:59:59.000Z

    unexplained by OLS equations between Texas and U.S. variables. Deterministic and probabilistic NFI projections for Texas crops were compared under the January 2005 and January 2006 FAPRI Baseline projections. With production costs increasing considerably...

  9. Using long-baseline interferometric gravitational waves detectors for high precision measures of the gravitational acceleration

    E-Print Network [OSTI]

    Christian Corda

    2007-01-25T23:59:59.000Z

    A derivation of the optical axis lenght fluctations due by tilts of the mirrors of the Fabry-Perot cavity of long-baseline interferometers for the detection of gravitational waves in presence of the gravitational field of the earth is discussed. By comparing with the typical tilt-induced noises it is shown that this potential signal, which is considered a weak source of noise, is negligible for the first generation of gravitational waves interferometers, but, in principle, this effect could be used for high precision measures of the gravitational acceleration if advanced projects will achieve an high sensitivity. In that case the precision of the misure could be higher than the gravimeter realized by the Istituto di Metrologia ``Gustavo Colonnetti''.

  10. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Canonsburg, Pennsylvania

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This baseline risk assessment evaluates potential impacts to public health and the environment resulting from ground water contamination from past activities at the former uranium processing site in Canonsburg, Pennsylvania. The US Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Project has placed contaminated material from this site in an on-site disposal cell. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the UMTRA Ground Water Project. Currently, no domestic or drinking water well tap into contaminated ground water of the two distinct ground water units: the unconsolidated materials and the bedrock. Because there is no access, no current health or environmental risks are associated with the direct use of the contaminated ground water. However, humans and ecological organisms could be exposed to contaminated ground water if a domestic well were to be installed in the unconsolidated materials in that part of the site being considered for public use (Area C). The first step is evaluating ground water data collected from monitor wells at the site. For the Canonsburg site, this evaluation showed the contaminants in ground water exceeding background in the unconsolidated materials in Area C are ammonia, boron, calcium, manganese, molybdenum, potassium, strontium, and uranium.

  11. River Protection Project (RPP) Tank Waste Retrieval and Disposal Mission Technical Baseline Summary Description

    SciTech Connect (OSTI)

    DOVALLE, O.R.

    1999-12-29T23:59:59.000Z

    This document is one of the several documents prepared by Lockheed Martin Hanford Corp. to support the U. S. Department of Energy's Tank Waste Retrieval and Disposal mission at Hanford. The Tank Waste Retrieval and Disposal mission includes the programs necessary to support tank waste retrieval; waste feed, delivery, storage, and disposal of immobilized waste; and closure of the tank farms.

  12. Baselines For Land-Use Change In The Tropics: Application To Avoided Deforestation Projects

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    B. Santa Cruz Department in Bolivia, C. northern Belize, D.area Belize Santa Cruz, Bolivia Paraná, Brazil Campeche,2) Santa Cruz State, Bolivia; (3) Paraná State in Brazil; (

  13. 200-UP-2 Operable Unit technical baseline report

    SciTech Connect (OSTI)

    Deford, D.H.

    1991-02-01T23:59:59.000Z

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO{sub 3}) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO{sub 3} Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab.

  14. Integrated Baseline System (IBS) Version 2.0: Models guide

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Models Guide summarizes the IBS use of several computer models for predicting the results of emergency situations. These include models for predicting dispersion/doses of airborne contaminants, traffic evacuation, explosion effects, heat radiation from a fire, and siren sound transmission. The guide references additional technical documentation on the models when such documentation is available from other sources. The audience for this manual is chiefly emergency management planners and analysts, but also data managers and system managers.

  15. Integrated Baseline System (IBS) Version 2.0: Utilities Guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States); Bower, J.C. [Bower Software Services, Kennewick, WA (United States)

    1994-03-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Utilities Guide explains how you can use the IBS utility programs to manage and manipulate various kinds of IBS data. These programs include utilities for creating, editing, and displaying maps and other data that are referenced to geographic location. The intended audience for this document are chiefly data managers but also system managers and some emergency management planners and analysts.

  16. Integrated Baseline System (IBS) Version 1.03: Utilities guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Pottier, M.C.; Schrank, E.E.; Williams, J.R.

    1993-01-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This Utilities Guide explains how to operate utility programs that are supplied as a part of the IBS. These utility programs are chiefly for managing and manipulating various kinds of IBS data and system administration files. Many of the utilities are for creating, editing, converting, or displaying map data and other data that are related to geographic location.

  17. Cost and Performance Comparison Baseline for Fossil Energy Power Plants

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration would likeConstitution AndControllingCoolCorrective Action1, CostCostBaseline

  18. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

  19. Baseline risk assessment of ground water contamination at the uranium mill tailings site Salt Lake City, Utah

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This baseline risk assessment of groundwater contamination at the uranium mill tailings site near Salt Lake City, Utah, evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium ore processing site. The tailings and other contaminated material at this site were placed in a disposal cell located at Clive, Utah, in 1987 by the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate residual ground water contamination at the former uranium processing site, known as the Vitro processing site. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine the appropriate remedial action for contaminated ground water at the site.

  20. Estimation of Energy Baseline by Simulation for On-going Commissioning and Energy Saving Retrofit 

    E-Print Network [OSTI]

    Miyata, M.; Yoshida, H.; Asada, M.; Iwata, T.; Tanabe, Y.; Yanagisawa, T.

    2006-01-01T23:59:59.000Z

    This paper proposes a method of estimating the adjusted energy baseline using simulation models, which can calculate the energy baseline with various conditions, such as conditions of weather, occupancy and equipment operations. Especially...

  1. High baseline activity in inferior temporal cortex improves neural and behavioral discriminability during visual categorization

    E-Print Network [OSTI]

    Emadi, Nazli

    Spontaneous firing is a ubiquitous property of neural activity in the brain. Recent literature suggests that this baseline activity plays a key role in perception. However, it is not known how the baseline activity contributes ...

  2. Estimate of CP Violation for the LBNE Project and $?_{CP}

    E-Print Network [OSTI]

    Leonard S. Kisslinger

    2012-06-27T23:59:59.000Z

    Measurements of CP violation (CPV) and the basic $\\delta_{CP}$ parameter are the goals of the LBNE Project, which is being planned. Using the expected energy and baseline parameters for the LBNE Project, CPV and the dependence of CPV on $\\delta_{CP}$ are estimated, to help in the planning of this project.

  3. Energy use baselining study for the National Naval Medical Center

    SciTech Connect (OSTI)

    Parker, G.B.; Halverson, M.A.

    1992-04-01T23:59:59.000Z

    This report provides an energy consumption profile for fourteen buildings at the National Naval Medical Center (NNMC) in Bethesda, Maryland. Recommendations are also made for viable energy efficiency projects funded with assistance from the servicing utility (Potomic Electric Power Company) in the form of rebates and incentives available in their Demand Side Management (DSM) program and through Shared Energy Savings (SES) projects. This report also provides estimates of costs and potential energy savings of the recommended projects.

  4. EA-1943: Long Baseline Neutrino Facility/Deep Underground Neutrino...

    Broader source: Energy.gov (indexed) [DOE]

    and at a "far detector," at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. NOTE: This Project was previously designated (DOEEA-1799). Further...

  5. Light Sterile Neutrinos and Short Baseline Neutrino Oscillation Anomalies

    E-Print Network [OSTI]

    JiJi Fan; Paul Langacker

    2012-01-31T23:59:59.000Z

    We study two possible explanations for short baseline neutrino oscillation anomalies, such as the LSND and MiniBooNE anti-neutrino data, and for the reactor anomaly. The first scenario is the mini-seesaw mechanism with two eV-scale sterile neutrinos. We present both analytic formulas and numerical results showing that this scenario could account for the short baseline and reactor anomalies and is consistent with the observed masses and mixings of the three active neutrinos. We also show that this scenario could arise naturally from an effective theory containing a TeV-scale VEV, which could be related to other TeV-scale physics. The minimal version of the mini-seesaw relates the active-sterile mixings to five real parameters and favors an inverted hierarchy. It has the interesting property that the effective Majorana mass for neutrinoless double beta decay vanishes, while the effective masses relevant to tritium beta decay and to cosmology are respectively around 0.2 and 2.4 eV. The second scenario contains only one eV-scale sterile neutrino but with an effective non-unitary mixing matrix between the light sterile and active neutrinos. We find that though this may explain the anomalies, if the non-unitarity originates from a heavy sterile neutrino with a large (fine-tuned) mixing angle, this scenario is highly constrained by cosmological and laboratory observations.

  6. Eielson Air Force Base OU-1 baseline risk assessment

    SciTech Connect (OSTI)

    Jarvis, M.T.; Jarvis, T.T.; Van Houten, N.C.; Lewis, R.E.

    1993-09-01T23:59:59.000Z

    This Baseline Risk Assessment report is the second volume in a set of three volumes for operable Unit 1 (OU-1). The companion documents contain the Remedial Investigation and the Feasibility Study. Operable Unit 1 (OU-1) is one of several groups of hazardous waste sites located at Eielson Air Force Base (AFB) near Fairbanks, Alaska. The operable units at Eielson are typically characterized by petroleum, oil, lubricant/solvent contamination, and by the presence of organics floating at the water table. In 1989 and 1990, firms under contract to the Air Force conducted field studies to gather information about the extent of chemical contamination in soil, groundwater, and soil air pore space (soil gas) at the site. This report documents the results of a baseline risk assessment, which uses the 1989 and 1991 site characterization database to quantify the potential human health risk associated with past Base industrial activities in the vicinity of OU-1. Background data collected in 1992 were also used in the preparation of this report.

  7. Synthesis and Comparison of Baseline Avian and Bat Use, Raptor Nesting and Mortality Information from Proposed and Existing Wind Developments: Final Report.

    SciTech Connect (OSTI)

    Erickson, Wallace P.

    2002-12-01T23:59:59.000Z

    Primarily due to concerns generated from observed raptor mortality at the Altamont Pass (CA) wind plant, one of the first commercial electricity generating wind plants in the U.S., new proposed wind projects both within and outside of California have received a great deal of scrutiny and environmental review. A large amount of baseline and operational monitoring data have been collected at proposed and existing U.S. wind plants. The primary use of the avian baseline data collected at wind developments has been to estimate the overall project impacts (e.g., very low, low, moderate, and high relative mortality) on birds, especially raptors and sensitive species (e.g., state and federally listed species). In a few cases, these data have also been used for guiding placement of turbines within a project boundary. This new information has strengthened our ability to accurately predict and mitigate impacts from new projects. This report should assist various stakeholders in the interpretation and use of this large information source in evaluating new projects. This report also suggests that the level of baseline data (e.g., avian use data) required to adequately assess expected impacts of some projects may be reduced. This report provides an evaluation of the ability to predict direct impacts on avian resources (primarily raptors and waterfowl/waterbirds) using less than an entire year of baseline avian use data (one season, two seasons, etc.). This evaluation is important because pre-construction wildlife surveys can be one of the most time-consuming aspects of permitting wind power projects. For baseline data, this study focuses primarily on standardized avian use data usually collected using point count survey methodology and raptor nest survey data. In addition to avian use and raptor nest survey data, other baseline data is usually collected at a proposed project to further quantify potential impacts. These surveys often include vegetation mapping and state or federal sensitive-status wildlife and plant surveys if there is a likelihood of these species occurring in the vicinity of the project area. This report does not address these types of surveys, however, it is assumed in this document that those surveys are conducted when appropriate to help further quantify potential impacts. The amount and extent of ecological baseline data to collect at a wind project should be determined on a case-by-case basis. The decision should use information gained from this report, recent information from new projects (e.g., Stateline OR/WA), existing project site data from agencies and other knowledgeable groups/individuals, public scoping, and results of vegetation and habitat mapping. Other factors that should also be considered include the likelihood of the presence of sensitive species at the site and expected impacts to those species, project size and project layout.

  8. Baseline risk assessment of ground water contamination at the inactive uriniferous lignite ashing site near Belfield, North Dakota

    SciTech Connect (OSTI)

    NONE

    1994-08-01T23:59:59.000Z

    This Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Belfield, North Dakota, evaluates potential impacts to public health or the environment resulting from ground water contamination at the site where coal containing uranium was burned to produce uranium. The US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project is evaluating plans to remedy soil and ground water contamination at the site. Phase I of the UMTRA Project consists of determining the extent of soil contamination. Phase II of the UMTRA Project consists of evaluating ground water contamination. Under Phase II, results of this risk assessment will help determine what remedial actions may be necessary for contaminated ground water at the site. This risk assessment evaluates the potential risks to human health and the environment resulting from exposure to contaminated ground water as it relates to historic processing activities at the site. Potential risk is quantified for constituents introduced from the processing activities, and not for those constituents naturally occurring in water quality in the site vicinity. Background ground water quality has the potential to cause adverse health effects from exposure through drinking. Any risks associated with contaminants attributable to site activities are incremental to these risks from background ground water quality. This incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition.

  9. August 2012 August 2012 Baseline Update for U.S.

    E-Print Network [OSTI]

    Noble, James S.

    for livestock, poultry, dairy and consumer price projections. FAPRIMU and AMAP are both part of the Integrated the University of Missouri. The crop and biofuel projections in this report were prepared by the team prices for many agricultural commodities. This report provides an update of the 2012 FAPRIMU long term

  10. Risk information in support of cost estimates for the Baseline Environmental Management Report (BEMR). Section 1

    SciTech Connect (OSTI)

    Gelston, G.M.; Jarvis, M.F.; Warren, B.R. [Pacific Northwest Lab., Richland, WA (United States); Von Berg, R. [ICF Kaiser Engineers, Inc., Oakland, CA (United States)

    1995-06-01T23:59:59.000Z

    The Pacific Northwest Laboratory (PNL)(1) effort on the overall Baseline Environmental Management Report (BEMR) project consists of four installation-specific work components performed in succession. These components include (1) development of source terms, 92) collection of data and preparation of environmental settings reports, (3) calculation of unit risk factors, and (4) utilization of the unit risk factors in Automated Remedial Action Methodology (ARAM) for computation of target concentrations and cost estimates. This report documents work completed for the Nevada Test Site, Nevada, for components 2 and 3. The product of this phase of the BEMR project is the development of unit factors (i.e., unit transport factors, unit exposure factors, and unit risk factors). Thousands of these unit factors are gene rated and fill approximately one megabyte of computer information per installation. The final unit risk factors (URF) are transmitted electronically to BEMR-Cost task personnel as input to a computer program (ARAM). Abstracted files and exhibits of the URF information are included in this report. These visual formats are intended to provide a sample of the final task deliverable (the URF files) which can be easily read without a computer.

  11. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  12. Sandia National Laboratories, California proposed CREATE facility environmental baseline survey.

    SciTech Connect (OSTI)

    Catechis, Christopher Spyros

    2013-10-01T23:59:59.000Z

    Sandia National Laboratories, Environmental Programs completed an environmental baseline survey (EBS) of 12.6 acres located at Sandia National Laboratories/California (SNL/CA) in support of the proposed Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) Facility. The survey area is comprised of several parcels of land within SNL/CA, County of Alameda, California. The survey area is located within T 3S, R 2E, Section 13. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

  13. Energy reconstruction in the Long-Baseline Neutrino Experiment

    E-Print Network [OSTI]

    Ulrich Mosel; Olga Lalakulich; Kai Gallmeister

    2014-04-24T23:59:59.000Z

    The Long-Baseline Neutrino Experiment aims at measuring fundamental physical parameters to high precision and exploring physics beyond the standard model. Nuclear targets introduce complications towards that aim. We investigate the uncertainties in the energy reconstruction, based on quasielastic scattering relations, due to nuclear effects. The reconstructed event distributions as a function of energy tend to be smeared out and shifted by several 100 MeV in their oscillatory structure if standard event selection is used. We show that a more restrictive experimental event selection offers the possibility to reach the accuracy needed for a determination of the mass ordering and the $CP$-violating phase. Quasielastic-based energy reconstruction could thus be a viable alternative to the calorimetric reconstruction also at higher energies.

  14. Integrated Baseline Bystem (IBS) Version 1.03: Models guide

    SciTech Connect (OSTI)

    Not Available

    1993-01-01T23:59:59.000Z

    The Integrated Baseline System)(IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planning and analysis. This document is the models guide for the IBS and explains how to use the emergency related computer models. This document provides information for the experienced system user, and is the primary reference for the computer modeling software supplied with the system. It is designed for emergency managers and planners, and others familiar with the concepts of computer modeling. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other IBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary.

  15. The Long-Baseline Neutrino Experiment: Exploring Fundamental Symmetries of the Universe

    E-Print Network [OSTI]

    LBNE Collaboration; Corey Adams; David Adams; Tarek Akiri; Tyler Alion; Kris Anderson; Costas Andreopoulos; Mike Andrews; Ioana Anghel; João Carlos Costa dos Anjos; Maddalena Antonello; Enrique Arrieta-Diaz; Marina Artuso; Jonathan Asaadi; Xinhua Bai; Bagdat Baibussinov; Michael Baird; Baha Balantekin; Bruce Baller; Brian Baptista; D'Ann Barker; Gary Barker; William A. Barletta; Giles Barr; Larry Bartoszek; Amit Bashyal; Matt Bass; Vincenzo Bellini; Pietro Angelo Benetti; Bruce E. Berger; Marc Bergevin; Eileen Berman; Hans-Gerd Berns; Adam Bernstein; Robert Bernstein; Babu Bhandari; Vipin Bhatnagar; Bipul Bhuyan; Jianming Bian; Mary Bishai; Andrew Blake; Flor Blaszczyk; Erik Blaufuss; Bruce Bleakley; Edward Blucher; Steve Blusk; Virgil Bocean; F. Boffelli; Jan Boissevain; Timothy Bolton; Maurizio Bonesini; Steve Boyd; Andrew Brandt; Richard Breedon; Carl Bromberg; Ralph Brown; Giullia Brunetti; Norman Buchanan; Bill Bugg; Jerome Busenitz; E. Calligarich; Leslie Camilleri; Giada Carminati; Rachel Carr; Cesar Castromonte; Flavio Cavanna; Sandro Centro; Alex Chen; Hucheng Chen; Kai Chen; Daniel Cherdack; Cheng-Yi Chi; Sam Childress; Brajesh Chandra Choudhary; Georgios Christodoulou; Cabot-Ann Christofferson; Eric Church; David Cline; Thomas Coan; Alfredo Cocco; Joao Coelho; Stephen Coleman; Janet M. Conrad; Mark Convery; Robert Corey; Luke Corwin; Jack Cranshaw; Daniel Cronin-Hennessy; A. Curioni; Helio da Motta; Tristan Davenne; Gavin S. Davies; Steven Dazeley; Kaushik De; Andre de Gouvea; Jeffrey K. de Jong; David Demuth; Chris Densham; Milind Diwan; Zelimir Djurcic; R. Dolfini; Jeffrey Dolph; Gary Drake; Stephen Dye; Hongue Dyuang; Daniel Edmunds; Steven Elliott; Muhammad Elnimr; Sarah Eno; Sanshiro Enomoto; Carlos O. Escobar; Justin Evans; A. Falcone; Lisa Falk; Amir Farbin; Christian Farnese; Angela Fava; John Felde; S. Fernandes; Fernando Ferroni; Farshid Feyzi; Laura Fields; Alex Finch; Mike Fitton; Bonnie Fleming; Jack Fowler; Walt Fox; Alex Friedland; Stu Fuess; Brian Fujikawa; Hugh Gallagher; Raj Gandhi; Gerald Garvey; Victor M. Gehman; Gianluigi de Geronimo; Daniele Gibin; Ronald Gill; Ricardo A. Gomes; Maury C. Goodman; Jason Goon; Nicholas Graf; Mathew Graham; Rik Gran; Christopher Grant; Nick Grant; Herbert Greenlee; Leland Greenler; Sean Grullon; Elena Guardincerri; Victor Guarino; Evan Guarnaccia; Germano Guedes; Roxanne Guenette; Alberto Guglielmi; Marcelo M. Guzzo; Alec T. Habig; Robert W. Hackenburg; Haleh Hadavand; Alan Hahn; Martin Haigh; Todd Haines; Thomas Handler; Sunej Hans; Jeff Hartnell; John Harton; Robert Hatcher; Athans Hatzikoutelis; Steven Hays; Eric Hazen; Mike Headley; Anne Heavey; Karsten Heeger; Jaret Heise; Robert Hellauer; Jeremy Hewes; Alexander Himmel; Matthew Hogan; Pedro Holanda; Anna Holin; Glenn Horton-Smith; Joe Howell; Patrick Hurh; Joey Huston; James Hylen; Richard Imlay; Jonathan Insler; G. Introzzi; Zeynep Isvan; Chris Jackson; John Jacobsen; David E. Jaffe; Cat James; Chun-Min Jen; Marvin Johnson; Randy Johnson; Robert Johnson; Scott Johnson; William Johnston; John Johnstone; Ben J. P. Jones; H. Jostlein; Thomas Junk; Richard Kadel; Karl Kaess; Georgia Karagiorgi; Jarek Kaspar; Teppei Katori; Boris Kayser; Edward Kearns; Paul Keener; Ernesto Kemp; Steve H. Kettell; Mike Kirby; Joshua Klein; Gordon Koizumi; Sacha Kopp; Laura Kormos; William Kropp; Vitaly A. Kudryavtsev; Ashok Kumar; Jason Kumar; Thomas Kutter; Franco La Zia; Kenneth Lande; Charles Lane; Karol Lang; Francesco Lanni; Richard Lanza; Tony Latorre; John Learned; David Lee; Kevin Lee; Qizhong Li; Shaorui Li; Yichen Li; Zepeng Li; Jiang Libo; Steve Linden; Jiajie Ling; Jonathan Link; Laurence Littenberg; Hu Liu; Qiuguang Liu; Tiankuan Liu; John Losecco; William Louis; Byron Lundberg; Tracy Lundin; Jay Lundy; Ana Amelia Machado; Cara Maesano; Steve Magill; George Mahler; David Malon; Stephen Malys; Francesco Mammoliti; Samit Kumar Mandal; Anthony Mann; Paul Mantsch; Alberto Marchionni; William Marciano; Camillo Mariani; Jelena Maricic; Alysia Marino; Marvin Marshak; John Marshall; Shiegenobu Matsuno; Christopher Mauger; Konstantinos Mavrokoridis; Nate Mayer; Neil McCauley; Elaine McCluskey; Kirk McDonald; Kevin McFarland; David McKee; Robert McKeown; Robert McTaggart; Rashid Mehdiyev; Dongming Mei; A. Menegolli; Guang Meng; Yixiong Meng; David Mertins; Mark Messier; William Metcalf; Radovan Milincic; William Miller; Geoff Mills; Sanjib R. Mishra; Nikolai Mokhov; Claudio Montanari; David Montanari; Craig Moore; Jorge Morfin; Ben Morgan; William Morse; Zander Moss; Célio A. Moura; Stuart Mufson; David Muller; Jim Musser; Donna Naples; Jim Napolitano; Mitch Newcomer; Ryan Nichol; Tim Nicholls; Evan Niner; Barry Norris

    2014-04-22T23:59:59.000Z

    The preponderance of matter over antimatter in the early Universe, the dynamics of the supernova bursts that produced the heavy elements necessary for life and whether protons eventually decay --- these mysteries at the forefront of particle physics and astrophysics are key to understanding the early evolution of our Universe, its current state and its eventual fate. The Long-Baseline Neutrino Experiment (LBNE) represents an extensively developed plan for a world-class experiment dedicated to addressing these questions. LBNE is conceived around three central components: (1) a new, high-intensity neutrino source generated from a megawatt-class proton accelerator at Fermi National Accelerator Laboratory, (2) a near neutrino detector just downstream of the source, and (3) a massive liquid argon time-projection chamber deployed as a far detector deep underground at the Sanford Underground Research Facility. This facility, located at the site of the former Homestake Mine in Lead, South Dakota, is approximately 1,300 km from the neutrino source at Fermilab -- a distance (baseline) that delivers optimal sensitivity to neutrino charge-parity symmetry violation and mass ordering effects. This ambitious yet cost-effective design incorporates scalability and flexibility and can accommodate a variety of upgrades and contributions. With its exceptional combination of experimental configuration, technical capabilities, and potential for transformative discoveries, LBNE promises to be a vital facility for the field of particle physics worldwide, providing physicists from around the globe with opportunities to collaborate in a twenty to thirty year program of exciting science. In this document we provide a comprehensive overview of LBNE's scientific objectives, its place in the landscape of neutrino physics worldwide, the technologies it will incorporate and the capabilities it will possess.

  16. Estimation and Analysis of Life Cycle Costs of Baseline EGS

    Broader source: Energy.gov [DOE]

    Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

  17. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  18. Project Management Plan Solution Stabilization

    SciTech Connect (OSTI)

    SATO, P.K.

    1999-08-31T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  19. Commercial Building Energy Baseline Modeling Software: Performance Metrics and Method Testing with Open Source Models and Implications for Proprietary Software Testing

    SciTech Connect (OSTI)

    Price, Phillip N.; Granderson, Jessica; Sohn, Michael; Addy, Nathan; Jump, David

    2013-09-01T23:59:59.000Z

    The overarching goal of this work is to advance the capabilities of technology evaluators in evaluating the building-level baseline modeling capabilities of Energy Management and Information System (EMIS) software. Through their customer engagement platforms and products, EMIS software products have the potential to produce whole-building energy savings through multiple strategies: building system operation improvements, equipment efficiency upgrades and replacements, and inducement of behavioral change among the occupants and operations personnel. Some offerings may also automate the quantification of whole-building energy savings, relative to a baseline period, using empirical models that relate energy consumption to key influencing parameters, such as ambient weather conditions and building operation schedule. These automated baseline models can be used to streamline the whole-building measurement and verification (M&V) process, and therefore are of critical importance in the context of multi-measure whole-building focused utility efficiency programs. This report documents the findings of a study that was conducted to begin answering critical questions regarding quantification of savings at the whole-building level, and the use of automated and commercial software tools. To evaluate the modeling capabilities of EMIS software particular to the use case of whole-building savings estimation, four research questions were addressed: 1. What is a general methodology that can be used to evaluate baseline model performance, both in terms of a) overall robustness, and b) relative to other models? 2. How can that general methodology be applied to evaluate proprietary models that are embedded in commercial EMIS tools? How might one handle practical issues associated with data security, intellectual property, appropriate testing ‘blinds’, and large data sets? 3. How can buildings be pre-screened to identify those that are the most model-predictable, and therefore those whose savings can be calculated with least error? 4. What is the state of public domain models, that is, how well do they perform, and what are the associated implications for whole-building measurement and verification (M&V)? Additional project objectives that were addressed as part of this study include: (1) clarification of the use cases and conditions for baseline modeling performance metrics, benchmarks and evaluation criteria, (2) providing guidance for determining customer suitability for baseline modeling, (3) describing the portfolio level effects of baseline model estimation errors, (4) informing PG&E’s development of EMIS technology product specifications, and (5) providing the analytical foundation for future studies about baseline modeling and saving effects of EMIS technologies. A final objective of this project was to demonstrate the application of the methodology, performance metrics, and test protocols with participating EMIS product vendors.

  20. Innovative coke oven gas cleaning system for retrofit applications. Environmental Monitoring program. Volume 1 - sampling progrom report. Baseline Sampling Program report

    SciTech Connect (OSTI)

    Stuart, L.M.

    1994-05-27T23:59:59.000Z

    Bethlehem Steel Corporation (BSC), in conjunction with the Department of Energy (DOE) is conducting a Clean Coal Technology (CCT) project at its Sparrows Point, Maryland Coke Oven Plant. This innovative coke oven gas cleaning system combines several existing technologies into an integrated system for removing impurities from Coke Oven Gas (COG) to make it an acceptable fuel. DOE provided cost-sharing under a Cooperative Agreement with BSC. This Cooperative Agreement requires BSC to develop and conduct and Environmental Monitoring Plan for the Clean Coal Technology project and to report the status of the EMP on a quarterly basis. It also requires the preparation of a final report on the results of the Baseline Compliance and Supplemental Sampling Programs that are part of the EMP and which were conducted prior to the startup of the innovative coke oven gas cleaning system. This report is the Baseline Sampling Program report.

  1. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  2. Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2011-06-01T23:59:59.000Z

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL's FY08 GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL's organizational boundaries but are a consequence of INL's activities). This inventory found that INL generated a total of 113,049 MT of CO2-equivalent emissions during FY08. The following conclusions were made from looking at the results of the individual contributors to INL's baseline GHG inventory: (1) Electricity (including the associated transmission and distribution losses) is the largest contributor to INL's GHG inventory, with over 50% of the CO2e emissions; (2) Other sources with high emissions were stationary combustion (facility fuels), waste disposal (including fugitive emissions from the onsite landfill and contracted disposal), mobile combustion (fleet fuels), employee commuting, and business air travel; and (3) Sources with low emissions were wastewater treatment (onsite and contracted), fugitive emissions from refrigerants, and business ground travel (in personal and rental vehicles). This report details the methods behind quantifying INL's GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by the Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only that large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

  3. Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2010-09-01T23:59:59.000Z

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at the INL. Additionally, the INL has a desire to see how its emissions compare with similar institutions, including other DOE-sponsored national laboratories. Executive Order 13514 requires that federally-sponsored agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL’s FY08 GHG inventory was calculated according to methodologies identified in Federal recommendations and an as-yet-unpublished Technical and Support Document (TSD) using operational control boundary. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries but are a consequence of INL’s activities). This inventory found that INL generated a total of 114,256 MT of CO2-equivalent emissions during fiscal year 2008 (FY08). The following conclusions were made from looking at the results of the individual contributors to INL’s baseline GHG inventory: • Electricity is the largest contributor to INL’s GHG inventory, with over 50% of the net anthropogenic CO2e emissions • Other sources with high emissions were stationary combustion, fugitive emissions from the onsite landfill, mobile combustion (fleet fuels) and the employee commute • Sources with low emissions were contracted waste disposal, wastewater treatment (onsite and contracted) and fugitive emissions from refrigerants. This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to stress that the methodology behind this inventory followed guidelines that have not yet been formally adopted. Thus, some modification of the conclusions may be necessary as additional guidance is received. Further, because this report differentiates between those portions of the INL that are managed and operated by the Battelle Energy Alliance (BEA) and those managed by other contractors, it includes only that large proportion of Laboratory activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

  4. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    SciTech Connect (OSTI)

    Wells, J.L.

    1997-03-01T23:59:59.000Z

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  5. Baseline mapping study of the Steed Pond aquifer and vadose zone beneath A/M Area, Savannah River Site, Aiken, South Carolina

    SciTech Connect (OSTI)

    Jackson, D.G. Jr.

    2000-01-27T23:59:59.000Z

    This report presents the second phase of a baseline mapping project conducted for the Environmental Restoration Department (ERD) at Savannah River Site. The purpose of this second phase is to map the structure and distribution of mud (clay and silt-sized sediment) within the vadose zone beneath A/M Area. The results presented in this report will assist future characterization and remediation activities in the vadose zone and upper aquifer zones in A/M Area.

  6. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  7. SCFA lead lab technical assistance at Lawrence Berkeley National Laboratory: Baseline review of three groundwater plumes

    E-Print Network [OSTI]

    Hazen, Terry

    2002-01-01T23:59:59.000Z

    Lab Technical Assistance #114 Lawrence Berkeley National Laboratory – Baseline Review of Three Groundwater Plumes Page 21 LBNL-51386 the Savannah River

  8. LTC America`s, Inc. PTC-6 vacuum system (metal): Baseline report

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  9. India's baseline plan for nuclear energy self-sufficiency.

    SciTech Connect (OSTI)

    Bucher, R .G.; Nuclear Engineering Division

    2009-01-01T23:59:59.000Z

    India's nuclear energy strategy has traditionally strived for energy self-sufficiency, driven largely by necessity following trade restrictions imposed by the Nuclear Suppliers Group (NSG) following India's 'peaceful nuclear explosion' of 1974. On September 6, 2008, the NSG agreed to create an exception opening nuclear trade with India, which may create opportunities for India to modify its baseline strategy. The purpose of this document is to describe India's 'baseline plan,' which was developed under constrained trade conditions, as a basis for understanding changes in India's path as a result of the opening of nuclear commerce. Note that this treatise is based upon publicly available information. No attempt is made to judge whether India can meet specified goals either in scope or schedule. In fact, the reader is warned a priori that India's delivery of stated goals has often fallen short or taken a significantly longer period to accomplish. It has been evident since the early days of nuclear power that India's natural resources would determine the direction of its civil nuclear power program. It's modest uranium but vast thorium reserves dictated that the country's primary objective would be thorium utilization. Estimates of India's natural deposits vary appreciably, but its uranium reserves are known to be extremely limited, totaling approximately 80,000 tons, on the order of 1% of the world's deposits; and nominally one-third of this ore is of very low uranium concentration. However, India's roughly 300,000 tons of thorium reserves account for approximately 30% of the world's total. Confronted with this reality, the future of India's nuclear power industry is strongly dependent on the development of a thorium-based nuclear fuel cycle as the only way to insure a stable, sustainable, and autonomous program. The path to India's nuclear energy self-sufficiency was first outlined in a seminal paper by Drs. H. J. Bhabha and N. B. Prasad presented at the Second United Nations Conference on the Peaceful Uses of Atomic Energy in 1958. The paper described a three stage plan for a sustainable nuclear energy program consistent with India's limited uranium but abundant thorium natural resources. In the first stage, natural uranium would be used to fuel graphite or heavy water moderated reactors. Plutonium extracted from the spent fuel of these thermal reactors would drive fast reactors in the second stage that would contain thorium blankets for breeding uranium-233 (U-233). In the final stage, this U-233 would fuel thorium burning reactors that would breed and fission U-233 in situ. This three stage blueprint still reigns as the core of India's civil nuclear power program. India's progress in the development of nuclear power, however, has been impacted by its isolation from the international nuclear community for its development of nuclear weapons and consequent refusal to sign the Nuclear Nonproliferation Treaty (NPT). Initially, India was engaged in numerous cooperative research programs with foreign countries; for example, under the 'Atoms for Peace' program, India acquired the Cirus reactor, a 40 MWt research reactor from Canada moderated with heavy water from the United States. India was also actively engaged in negotiations for the NPT. But, on May 18, 1974, India conducted a 'peaceful nuclear explosion' at Pokharan using plutonium produced by the Cirus reactor, abruptly ending the era of international collaboration. India then refused to sign the NPT, which it viewed as discriminatory since it would be required to join as a non-nuclear weapons state. As a result of India's actions, the Nuclear Suppliers Group (NSG) was created in 1975 to establish guidelines 'to apply to nuclear transfers for peaceful purposes to help ensure that such transfers would not be diverted to unsafeguarded nuclear fuel cycle or nuclear explosive activities. These nuclear export controls have forced India to be largely self-sufficient in all nuclear-related technologies.

  10. Long-Term Stewardship Baseline Report and Transition Guidance

    SciTech Connect (OSTI)

    Kristofferson, Keith

    2001-11-01T23:59:59.000Z

    Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after facility cleanup is complete. As the Department of Energy’s (DOE) lead laboratory for environmental management programs, the Idaho National Engineering and Environmental Laboratory (INEEL) administers DOE’s long-term stewardship science and technology efforts. The INEEL provides DOE with technical, and scientific expertise needed to oversee its long-term environmental management obligations complexwide. Long-term stewardship is administered and overseen by the Environmental Management Office of Science and Technology. The INEEL Long-Term Stewardship Program is currently developing the management structures and plans to complete INEEL-specific, long-term stewardship obligations. This guidance document (1) assists in ensuring that the program leads transition planning for the INEEL with respect to facility and site areas and (2) describes the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete. Additionally, this document summarizes current information on INEEL facilities, structures, and release sites likely to enter long-term stewardship at the completion of DOE’s cleanup mission. This document is not intended to function as a discrete checklist or local procedure to determine readiness to transition. It is an overarching document meant as guidance in implementing specific transition procedures. Several documents formed the foundation upon which this guidance was developed. Principal among these documents was the Long-Term Stewardship Draft Technical Baseline; A Report to Congress on Long-Term Stewardship, Volumes I and II; Infrastructure Long-Range Plan; Comprehensive Facility Land Use Plan; INEEL End-State Plan; and INEEL Institutional Plan.

  11. Vandenberg Air Force Base integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Halverson, M.A.; Richman, E.E.; Dagle, J.E.; Hickman, B.J.; Daellenbach, K.K.; Sullivan, G.P.

    1993-06-01T23:59:59.000Z

    The US Air Force Space Command has tasked the Pacific Northwest Laboratory, as the lead laboratory supporting the US Department of Energy Federal Energy Management Program, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is a model program PNL is designing for federal customers served by the Pacific Gas and Electric Company (PG and E). The primary goal of the VAFB project is to identify all electric energy efficiency opportunities, and to negotiate with PG and E to acquire those resources through a customized demand-side management program for its federal clients. That customized program should have three major characteristics: (1) 100% up-front financing; (2) substantial utility cost-sharing; and (3) utility implementation through energy service companies under contract to the utility. A similar arrangement will be pursued with Southern California Gas for non-electric resource opportunities if that is deemed desirable by the site and if the gas utility seems open to such an approach. This report documents the assessment of baseline energy use at VAFB located near Lompoc, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Resource Assessment. This analysis examines the characteristics of electric, natural gas, fuel oil, and propane use for fiscal year 1991. It records energy-use intensities for the facilities at VAFB by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A more complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, and applicable losses.

  12. Single-shell tank interim stabilization project plan

    SciTech Connect (OSTI)

    Ross, W.E.

    1998-05-11T23:59:59.000Z

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  13. Single Shell Tank (SST) Interim Stabilization Project Plan

    SciTech Connect (OSTI)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22T23:59:59.000Z

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  14. A risk evaluation for the fuel retrieval sub-project

    SciTech Connect (OSTI)

    Carlisle, B.S.

    1996-10-11T23:59:59.000Z

    This study reviews the technical, schedule and budget baselines of the sub-project to assure all significant issues have been identified on the sub-project issues management list. The issue resolution dates are identified and resolution plans established. Those issues that could adversely impact procurement activities have been uniquely identified on the list and a risk assessment completed.

  15. Kalispel Resident Fish Project, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    Olson, Jason; Andersen, Todd

    2005-06-01T23:59:59.000Z

    In 2004 the Kalispel Natural Resource Department (KNRD) implemented a new enhancement monitoring project for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in tributaries to the Pend Oreille River.

  16. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    SciTech Connect (OSTI)

    Olson, Jason; Andersen, Todd (Kalispel Natural Resource Department, Usk, WA)

    2006-07-01T23:59:59.000Z

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  17. Carbon Code Requirements for voluntary carbon sequestration projects

    E-Print Network [OSTI]

    Woodland Carbon Code Requirements for voluntary carbon sequestration projects ® Version 1.2 July trademark 10 3. Carbon sequestration 11 3.1 Units of carbon calculation 11 3.2 Carbon baseline 11 3.3 Carbon leakage 12 3.4 Project carbon sequestration 12 3.5 Net carbon sequestration 13 4. Environmental quality 14

  18. Baseline effects on carbon footprints of biofuels: The case of wood

    SciTech Connect (OSTI)

    Johnson, Eric, E-mail: johnsonatlantic@gmail.com [Atlantic Consulting, 8136 Gattikon (Switzerland); Tschudi, Daniel [ETH, Berghaldenstrasse 46, 8800 Thalwil (Switzerland)

    2012-11-15T23:59:59.000Z

    As biofuel usage has boomed over the past decade, so has research and regulatory interest in its carbon accounting. This paper examines one aspect of that carbon accounting: the baseline, i.e. the reference case against which other conditions or changes can be compared. A literature search and analysis identified four baseline types: no baseline; reference point; marginal fossil fuel; and biomass opportunity cost. The fourth one, biomass opportunity cost, is defined in more detail, because this is not done elsewhere in the literature. The four baselines are then applied to the carbon footprint of a wood-fired power plant. The footprint of the resulting wood-fired electricity varies dramatically, according to the type of baseline. Baseline type is also found to be the footprint's most significant sensitivity. Other significant sensitivities are: efficiency of the power plant; the growth (or re-growth) rate of the forest that supplies the wood; and the residue fraction of the wood. Length of the policy horizon is also an important factor in determining the footprint. The paper concludes that because of their significance and variability, baseline choices should be made very explicit in biofuel carbon footprints. - Highlights: Black-Right-Pointing-Pointer Four baseline types for biofuel footprinting are identified. Black-Right-Pointing-Pointer One type, 'biomass opportunity cost', is defined mathematically and graphically. Black-Right-Pointing-Pointer Choice of baseline can dramatically affect the footprint result. Black-Right-Pointing-Pointer The 'no baseline' approach is not acceptable. Black-Right-Pointing-Pointer Choice between the other three baselines depends on the question being addressed.

  19. Baseline risk assessment of ground water contamination at the inactive uriniferous lignite ashing site near Belfield, North Dakota. Revision 1

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    This risk assessment evaluates the potential for impacts to public health or the environment from contaminated ground water at this site caused by the burning of coal containing uranium to produce uranium. Potential risk is quantified for constituents introduced from the processing activities and not for those constituents naturally occurring in background ground water in the site vicinity. Because background ground water quality has the potential to cause adverse health effects from exposure through drinking, any risks associated with contaminants attributable to site activities are incremental to these risks from background. The incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition. The US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to remedy soil and ground water contamination at the site. The UMTRA Surface Project consists of determining the extent of soil contamination and disposing of the contaminated soils in an engineered disposal cell. The UMTRA Ground Water Project consists of evaluating ground water contamination. Under the UMTRA Ground Water Project, results of this risk assessment will help determine what ground water compliance strategy may be applied at the site.

  20. FAPRI-MU Biofuel Baseline FAPRI-MU Report #02-13

    E-Print Network [OSTI]

    Noble, James S.

    FAPRI-MU Biofuel Baseline March 2013 FAPRI-MU Report #02-13 Providing objective analysis for more of Education, Office of Civil Rights. #12;1 Executive Summary This report takes a closer look at the biofuels portion of the U.S. Agricultural and Biofuels Baseline released by the Food and Agricultural Policy

  1. A Baseline Assessment of the Ecological Resources of Jobos Bay, Puerto Rico

    E-Print Network [OSTI]

    A Baseline Assessment of the Ecological Resources of Jobos Bay, Puerto Rico July 2011 Editors David. A Baseline Assessment of the Ecological Resources of Jobos Bay, Puerto Rico. NOAA Technical Memorandum NOS of the Ecological Resources of Jobos Bay, Puerto Rico Prepared by the Coastal and Oceanographic Assessment, Status

  2. U.S. Biofuels Baseline and Impact of E-15 Expansion on Biofuel Markets

    E-Print Network [OSTI]

    Noble, James S.

    May 2012 U.S. Biofuels Baseline and Impact of E-15 Expansion on Biofuel Markets FAPRI-MU Report #02 for agricultural and biofuel markets.1 That baseline assumes current biofuel policy, including provisions credit expired, as scheduled, at the end of 2011. The additional tax credit for cellulosic biofuel

  3. GTA (ground test accelerator) Phase 1: Baseline design report

    SciTech Connect (OSTI)

    Not Available

    1986-08-01T23:59:59.000Z

    The national Neutral Particle Beam (NPB) program has two objectives: to provide the necessary basis for a discriminator/weapon decision by 1992, and to develop the technology in stages that lead ultimately to a neutral particle beam weapon. The ground test accelerator (GTA) is the test bed that permits the advancement of the state-of-the-art under experimental conditions in an integrated automated system mode. An intermediate goal of the GTA program is to support the Integrated Space Experiments, while the ultimate goal is to support the 1992 decision. The GTA system and each of its major subsystems are described, and project schedules and resource requirements are provided. (LEW)

  4. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  5. Low No{sub x}/SO{sub x} burner retrofit for utility cyclone boilers. Baseline test report: Issue A

    SciTech Connect (OSTI)

    Moore, K.; Martin, L.; Smith, J.

    1991-05-01T23:59:59.000Z

    The Low NO{sub x}/SO{sub x} (LNS) Burner Retrofit for Utility Cyclone Boilers program consists of the retrofit and subsequent demonstration of the technology at Southern Illinois Power Cooperative`s (SIPC`s) 33-MW unit 1 cyclone boiler located near Marion, Illinois. The LNS Burner employs a simple innovative combustion process burning high-sulfur Illinois coal to provide substantial SO{sub 2} and NO{sub x} control within the burner. A complete series of boiler performance and characterization tests, called the baseline tests, was conducted in October 1990 on unit 1 of SIPC`s Marion Station. The primary objective of the baseline test was to collect data from the existing plant that could provide a comparison of performance after the LNS Burner retrofit. These data could confirm the LNS Burner`s SO{sub x} and NO{sub x} emissions control and any effect on boiler operation. Further, these tests would provide to the project experience with the operating characteristics of the host unit as well as engineering design information to minimize technical uncertainties in the application of the LNS Burner technology.

  6. Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

    SciTech Connect (OSTI)

    KLEM, M.J.

    2000-10-18T23:59:59.000Z

    In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the references used for this document.

  7. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    SciTech Connect (OSTI)

    SINCLAIR, J.C.

    1999-05-03T23:59:59.000Z

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

  8. Ris-R-1380(EN) Wind Power Projects in the CDM

    E-Print Network [OSTI]

    Risø-R-1380(EN) Wind Power Projects in the CDM: Methodologies and Tools for Baselines, Carbon, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends

  9. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated ground water at the Bowman site.

  10. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas.

  11. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Shiprock, New Mexico. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    This baseline risk assessment at the former uranium mill tailings site near Shiprock, New Mexico, evaluates the potential impact to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an on-site disposal cell in 1986 through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. There are no domestic or drinking water wells in the contaminated ground water of the two distinct ground water units: the contaminated ground water in the San Juan River floodplain alluvium below the site and the contaminated ground water in the terrace alluvium area where the disposal cell is located. Because no one is drinking the affected ground water, there are currently no health or environmental risks directly associated with the contaminated ground water. However, there is a potential for humans, domestic animals, and wildlife to the exposed to surface expressions of ground water in the seeps and pools in the area of the San Juan River floodplain below the site. For these reasons, this risk assessment evaluates potential exposure to contaminated surface water and seeps as well as potential future use of contaminated ground water.

  12. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  13. Baseline information development for energy smart schools -- applied research, field testing and technology integration

    SciTech Connect (OSTI)

    Xu, Tengfang; Piette, Mary Ann

    2004-08-05T23:59:59.000Z

    The original scope of work was to obtain and analyze existing and emerging data in four states: California, Florida, New York, and Wisconsin. The goal of this data collection was to deliver a baseline database or recommendations for such a database that could possibly contain window and daylighting features and energy performance characteristics of Kindergarten through 12th grade (K-12) school buildings (or those of classrooms when available). In particular, data analyses were performed based upon the California Commercial End-Use Survey (CEUS) databases to understand school energy use, features of window glazing, and availability of daylighting in California K-12 schools. The outcomes from this baseline task can be used to assist in establishing a database of school energy performance, assessing applications of existing technologies relevant to window and daylighting design, and identifying future R&D needs. These are in line with the overall project goals as outlined in the proposal. Through the review and analysis of this data, it is clear that there are many compounding factors impacting energy use in K-12 school buildings in the U.S., and that there are various challenges in understanding the impact of K-12 classroom energy use associated with design features of window glazing and skylight. First, the energy data in the existing CEUS databases has, at most, provided the aggregated electricity and/or gas usages for the building establishments that include other school facilities on top of the classroom spaces. Although the percentage of classroom floor area in schools is often available from the databases, there is no additional information that can be used to quantitatively segregate the EUI for classroom spaces. In order to quantify the EUI for classrooms, sub-metering of energy usage by classrooms must be obtained. Second, magnitudes of energy use for electricity lighting are not attainable from the existing databases, nor are the lighting levels contributed by artificial lighting or daylight. It is impossible to reasonably estimate the lighting energy consumption for classroom areas in the sample of schools studied in this project. Third, there are many other compounding factors that may as well influence the overall classroom energy use, e.g., ventilation, insulation, system efficiency, occupancy, control, schedules, and weather. Fourth, although we have examined the school EUI grouped by various factors such as climate zones, window and daylighting design features from the California databases, no statistically significant associations can be identified from the sampled California K-12 schools in the current California CEUS. There are opportunities to expand such analyses by developing and including more powerful CEUS databases in the future. Finally, a list of parameters is recommended for future database development and for use of future investigation in K-12 classroom energy use, window and skylight design, and possible relations between them. Some of the key parameters include: (1) Energy end use data for lighting systems, classrooms, and schools; (2) Building design and operation including features for windows and daylighting; and (3) Other key parameters and information that would be available to investigate overall energy uses, building and systems design, their operation, and services provided.

  14. Material Stabilization Project Management Plan

    SciTech Connect (OSTI)

    SPEER, D.R.

    1999-09-01T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  15. Insertion Devices for NSLS-II Baseline and Future

    SciTech Connect (OSTI)

    Tanabe,T.

    2008-06-23T23:59:59.000Z

    NSLS-II is going to employ Damping Wigglers (DWs) not only for emittance reduction but also as broad band hard X-ray source. In-Vacuum Undulators (IVUs) with the minimum RMS phase error (< 2 degree) and possible cryo-capability are planned for X-ray planar device. Elliptically Polarized Undulators (EPUs) are envisioned for polarization controls. Due to the lack of hard X-ray flux from weak dipole magnet field (0.4 Tesla), three pole wigglers (3PWs) of the peak field over 1 Tesla will be mainly used by NSLS bending magnet beam line users. Magnetic designs and kick maps for dynamic aperture surveys were created using the latest version of Radia [1] for Mathematica 6 which we supported the development. There are other devices planned for the later stage of the project, such as quasi-periodic EPU, superconducting wiggler/undulator, and Cryo-Permanent Magnet Undulator (CPMU) with Praseodymium Iron Boron (PrFeB) magnets and textured Dysprosium poles. For R&D, Hybrid PrFeB arrays were planned to be assembled and field-measured at room temperature, liquid nitrogen and liquid helium temperature using our vertical test facility. We have also developed a specialized power supply for pulsed wire measurement.

  16. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

  17. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  18. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: · Building fabric replacement and revised space planning · New mechanical and electrical

  19. Accurate DEM reconstruction from Permanent Scatterers and multi-baseline interferometry

    E-Print Network [OSTI]

    Perissin, Daniele

    and for improving the accuracy of the results. By means of a wide range of baselines, the relative 3D positioning using a coarse resolution DEM or the data of the Shuttle Radar Topography Mission (SRTM). In this paper

  20. Stiffness-Mass Ratios Method for a baseline determination and damage assessment of a benchmark structure

    E-Print Network [OSTI]

    Rocha, Ramses Rodriguez

    2002-01-01T23:59:59.000Z

    A new method based on ratios between stiffness and mass values from the eigenvalue problem is introduced and applied to the benchmark structure to obtain baseline modal parameters utilizing damaged state information of the structure. The benchmark...

  1. Baseline for the cumulants of net-proton distributions at STAR

    E-Print Network [OSTI]

    Xiaofeng Luo; Bedangadas Mohanty; Nu Xu

    2014-11-26T23:59:59.000Z

    We present a systematic comparison between the recently measured cumulants of the net-proton distributions by STAR for 0-5% central Au+Au collisions at $\\sqrt{s_{NN}}$=7.7-200 GeV and two kinds of possible baseline measures, the Poisson and Binomial baselines. These baseline measures are assuming that the proton and anti-proton distributions independently follow Poisson statistics or Binomial statistics. The higher order cumulant net-proton data are observed to deviate from all the baseline measures studied at 19.6 and 27 GeV. We also compare the net-proton with net-baryon fluctuations in UrQMD and AMPT model, and convert the net-proton fluctuations to net-baryon fluctuations in AMPT model by using a set of formula.

  2. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site in Lakeview, Oregon

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site in Lake view, Oregon evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site.

  3. "What's Going On Out There?" A Baseline Survey for the LCRA's Good Cents Home Program

    E-Print Network [OSTI]

    Knutsen, T.

    1994-01-01T23:59:59.000Z

    The question, What constitutes your baseline?" always challenges Demand-Side Management program staff. This study answers that question for the Lower Colorado River Authority's Good Cents Home Program. The Lower Colorado River Authority (LCRA) has...

  4. The Science and Strategy for Phasing of the Long-Baseline Neutrino Experiment

    SciTech Connect (OSTI)

    Diwan M. V.

    2012-05-22T23:59:59.000Z

    This note is about the principles behind a phased plan for realizing a Long-Baseline Neutrino Experiment(LBNE) in the U.S.. The most important issue that must be resolved is the direction of the first phase of the experiment. Based on both scientific and programmatic considerations, the U.S. should pursue the best option for accelerator neutrino physics, which is the longer baseline towards Homestake with an optimizedbroadband intense beam.

  5. Project plan international atomic energy agency (IAEA) safeguards project plutonium finishing plant

    SciTech Connect (OSTI)

    BARTLETT, W.D.

    1999-05-13T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) International Atomic Energy Agency (IAEA) project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the PFP Integrated Project Management Plan (PMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for the PFP IAEA project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the IAEA project. Any deviations to the document must be authorized through the appropriate change control process.

  6. Statistical Analysis of Baseline Load Models for Non-Residential Buildings

    SciTech Connect (OSTI)

    Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

    2008-11-10T23:59:59.000Z

    Policymakers are encouraging the development of standardized and consistent methods to quantify the electric load impacts of demand response programs. For load impacts, an essential part of the analysis is the estimation of the baseline load profile. In this paper, we present a statistical evaluation of the performance of several different models used to calculate baselines for commercial buildings participating in a demand response program in California. In our approach, we use the model to estimate baseline loads for a large set of proxy event days for which the actual load data are also available. Measures of the accuracy and bias of different models, the importance of weather effects, and the effect of applying morning adjustment factors (which use data from the day of the event to adjust the estimated baseline) are presented. Our results suggest that (1) the accuracy of baseline load models can be improved substantially by applying a morning adjustment, (2) the characterization of building loads by variability and weather sensitivity is a useful indicator of which types of baseline models will perform well, and (3) models that incorporate temperature either improve the accuracy of the model fit or do not change it.

  7. Baseline Concept Description of a Small Modular High Temperature Reactor

    SciTech Connect (OSTI)

    Hans Gougar

    2014-05-01T23:59:59.000Z

    The objective of this report is to provide a description of generic small modular high temperature reactors (herein denoted as an smHTR), summarize their distinguishing attributes, and lay out the research and development (R&D) required for commercialization. The generic concepts rely heavily on the modular high temperature gas-cooled reactor designs developed in the 1980s which were never built but for which pre-licensing or certification activities were conducted. The concept matured more recently under the Next Generation Nuclear Plant (NGNP) project, specifically in the areas of fuel and material qualification, methods development, and licensing. As all vendor-specific designs proposed under NGNP were all both ‘small’ or medium-sized and ‘modular’ by International Atomic Energy Agency (IAEA) and Department of Energy (DOE) standards, the technical attributes, challenges, and R&D needs identified, addressed, and documented under NGNP are valid and appropriate in the context of Small Modular Reactor (SMR) applications. Although the term High Temperature Reactor (HTR) is commonly used to denote graphite-moderated, thermal spectrum reactors with coolant temperatures in excess of 650oC at the core outlet, in this report the historical term High Temperature Gas-Cooled Reactor (HTGR) will be used to distinguish the gas-cooled technology described herein from its liquid salt-cooled cousin. Moreover, in this report it is to be understood that the outlet temperature of the helium in an HTGR has an upper limit of 950 degrees C which corresponds to the temperature to which certain alloys are currently being qualified under DOE’s ARC program. Although similar to the HTGR in just about every respect, the Very High Temperature Reactor (VHTR) may have an outlet temperature in excess of 950 degrees C and is therefore farther from commercialization because of the challenges posed to materials exposed to these temperatures. The VHTR is the focus of R&D under the Generation IV program and its specific R&D needs will be included in this report when appropriate for comparison. The distinguishing features of the HTGR are the refractory (TRISO) coated particle fuel, the low-power density, graphite-moderated core, and the high outlet temperature of the inert helium coolant. The low power density and fuel form effectively eliminate the possibility of core melt, even upon a complete loss of coolant pressure and flow. The graphite, which constitutes the bulk of the core volume and mass, provides a large thermal buffer that absorbs fission heat such that thermal transients occur over a timespan of hours or even days. As chemically-inert helium is already a gas, there is no coolant temperature or void feedback on the neutronics and no phase change or corrosion product that could degrade heat transfer. Furthermore, the particle coatings and interstitial graphite retain fission products such that the source terms at the plant boundary remain well below actionable levels under all anticipated nominal and off-normal operating conditions. These attributes enable the reactor to supply process heat to a collocated industrial plant with negligible risk of contamination and minimal dynamic coupling of the facilities (Figure 1). The exceptional retentive properties of coated particle fuel in a graphite matrix were first demonstrated in the DRAGON reactor, a European research facility that began operation in 1964.

  8. Project plan remove special nuclear material from PFP project plutonium finishing plant

    SciTech Connect (OSTI)

    BARTLETT, W.D.

    1999-05-13T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process.

  9. Examining Uncertainty in Demand Response Baseline Models and Variability in Automated Response to Dynamic Pricing

    SciTech Connect (OSTI)

    Mathieu, Johanna L.; Callaway, Duncan S.; Kiliccote, Sila

    2011-08-15T23:59:59.000Z

    Controlling electric loads to deliver power system services presents a number of interesting challenges. For example, changes in electricity consumption of Commercial and Industrial (C&I) facilities are usually estimated using counterfactual baseline models, and model uncertainty makes it difficult to precisely quantify control responsiveness. Moreover, C&I facilities exhibit variability in their response. This paper seeks to understand baseline model error and demand-side variability in responses to open-loop control signals (i.e. dynamic prices). Using a regression-based baseline model, we define several Demand Response (DR) parameters, which characterize changes in electricity use on DR days, and then present a method for computing the error associated with DR parameter estimates. In addition to analyzing the magnitude of DR parameter error, we develop a metric to determine how much observed DR parameter variability is attributable to real event-to-event variability versus simply baseline model error. Using data from 38 C&I facilities that participated in an automated DR program in California, we find that DR parameter errors are large. For most facilities, observed DR parameter variability is likely explained by baseline model error, not real DR parameter variability; however, a number of facilities exhibit real DR parameter variability. In some cases, the aggregate population of C&I facilities exhibits real DR parameter variability, resulting in implications for the system operator with respect to both resource planning and system stability.

  10. Neutrino Project X at Fermilab

    SciTech Connect (OSTI)

    Parke, Stephen J.; /Fermilab

    2008-07-01T23:59:59.000Z

    In this talk I will give a brief description of Project X and an outline of the Neutrino Physics possibilities it provides at Fermilab. Project X is the generic name given to a new intense proton source at Fermilab. This source would produce more than 2 MW of proton power at 50 to 120 GeV, using the main injector, which could be used for a variety of long baseline neutrino experiments. A new 8 GeV linac would be required with many components aligned with a possible future ILC. In addition to the beam power from the main injector there is an additional 200 kW of 8 GeV protons that could be used for kaon, muon, experiments.

  11. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site.

  12. Microbunch preserving in-line system for an APPLE II helical radiator at the LCLS baseline

    E-Print Network [OSTI]

    Geloni, Gianluca; Saldin, Evgeni

    2011-01-01T23:59:59.000Z

    In a previous work we proposed a scheme for polarization control at the LCLS baseline, which exploited the microbunching from the planar undulator. After the baseline undulator, the electron beam is transported through a drift by a FODO focusing system, and through a short helical radiator. The microbunching structure can be preserved, and intense coherent radiation is emitted in the helical undulator at fundamental harmonic. The driving idea of this proposal is that the background linearly-polarized radiation from the baseline undulator is suppressed by spatial filtering. Filtering is achieved by letting radiation and electron beam through Be slits upstream of the helical radiator, where the radiation spot size is about ten times larger than the electron beam transverse size. Several changes considered in the present paper were made to improve the previous design. Slits are now placed immediately behind the helical radiator. The advantage is that the electron beam can be spoiled by the slits, and narrower sl...

  13. Project Execution Plan, Rev. 3

    SciTech Connect (OSTI)

    IT Corporation, Las Vegas

    2002-08-01T23:59:59.000Z

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls.

  14. Kalispel Resident Fish Project : Annual Report, 2008.

    SciTech Connect (OSTI)

    Andersen, Todd [Kalispel Natural Resource Department

    2009-07-08T23:59:59.000Z

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  15. Annotated Bibliography for the DEWPOINT project

    SciTech Connect (OSTI)

    Oehmen, Christopher S.

    2009-04-21T23:59:59.000Z

    This bibliography covers aspects of the Detection and Early Warning of Proliferation from Online INdicators of Threat (DEWPOINT) project including 1) data management and querying, 2) baseline and advanced methods for classifying free text, and 3) algorithms to achieve the ultimate goal of inferring intent from free text sources. Metrics for assessing the quality and correctness of classification are addressed in the second group. Data management and querying include methods for efficiently storing, indexing, searching, and organizing the data we expect to operate on within the DEWPOINT project.

  16. Sparse matrix transform for fast projection to reduced dimension

    SciTech Connect (OSTI)

    Theiler, James P [Los Alamos National Laboratory; Cao, Guangzhi [GE HEALTHCARE; Bouman, Charles A [PURDUE UNIV

    2010-01-01T23:59:59.000Z

    We investigate three algorithms that use the sparse matrix transform (SMT) to produce variance-maximizing linear projections to a lower-dimensional space. The SMT expresses the projection as a sequence of Givens rotations and this enables computationally efficient implementation of the projection operator. The baseline algorithm uses the SMT to directly approximate the optimal solution that is given by principal components analysis (PCA). A variant of the baseline begins with a standard SMT solution, but prunes the sequence of Givens rotations to only include those that contribute to the variance maximization. Finally, a simpler and faster third algorithm is introduced; this also estimates the projection operator with a sequence of Givens rotations, but in this case, the rotations are chosen to optimize a criterion that more directly expresses the dimension reduction criterion.

  17. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  18. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  19. Velocity Induced Neutrino Oscillation and its Possible Implications for Long Baseline Neutrinos

    E-Print Network [OSTI]

    Banik, Amit Dutta

    2014-01-01T23:59:59.000Z

    If the three types of active neutrinos possess different maximum attainable velocities and the neutrino eigenstates in the velocity basis are different from those in the flavour (and mass) basis then this will induce a flavour oscillation in addition to the normal mass flavour oscillation. Here we study such an oscillation scenario in three neutrino framework including also the matter effect and apply our results to demonstrate its consequences for long baseline neutrinos. We also predict the possible signatures in terms of yields in a possible long baseline neutrino experiment.

  20. Fermilab Note: FN-0776-E A Large Liquid Argon Time Projection Chamber for Long-baseline, Off-Axis

    E-Print Network [OSTI]

    McDonald, Kirk

    . . . . . . . . . . . . . . . . . . . . . . . . 24 5.2 Argon Cooling, Supply, and Purification . . . . . . . . . . . . . . . . 27 5.3 Electronics

  1. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    de?ne as all heavy and distillate fuel oil plants. Theirengines burning heavy fuel oil, whereas prior to that, theit is available and heavy fuel oil for supplying power to

  2. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    generators entered into power purchase agreements (PPAs)take-orpay clause in its power purchase agreement. While thereceived generous power purchase agreements, but information

  3. Development of a Monitoring and Verification (M&V) Plan and Baseline for the Fort Hood ESPC Project

    E-Print Network [OSTI]

    Haberl, J. S.; Liu, Z.; Baltazar-Cervantes, J. C.; Lynn, B.; Underwood, D.

    2004-01-01T23:59:59.000Z

    Fort Hood has selected an Energy Services Performance Contract (ESPC) contractor to help achieve its energy reduction goals as mandated by Executive Order. This ESPC is expected to be a $3.8 million, 20 year contract, which includes five primary...

  4. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15T23:59:59.000Z

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  5. Intra-tumor heterogeneity on baseline 18 F-FDG PET images

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Intra-tumor heterogeneity on baseline 18 F-FDG PET images characterized by textural features 4. INSERM, U613, Faculty of Medicine, Brest F-29200, France Keywords: 18 F-FDG PET, esophageal(0)298018124 Email: florent.tixier@etudiant.univ-brest.fr Short running title: PET texture analysis predicts response

  6. Energy Analysis, Baselining and Modeling of Prairie View A&M University

    E-Print Network [OSTI]

    Abushakra, B.; Haberl, J. S.; Claridge, D. E.; Eggebrecht, J.; Carlson, K. A.

    1998-01-01T23:59:59.000Z

    Analysis of the available data found that electricity savings in the J.B. Coleman Library for June - September, 1998 were 298 MWh, or 38% of the baseline consumption during these months. Extrapolation of these savings to a full year leads would...

  7. DRAFT VERSION September 6, 2009 1 1990 GHG Baseline for Building Energy Use

    E-Print Network [OSTI]

    Escher, Christine

    DRAFT VERSION ­ September 6, 2009 1 1990 GHG Baseline for Building Energy Use in the Oregon of 1990 building energy use and the associated greenhouse gas (GHG) emissions for Oregon University System's stated intent. Specifically, there is a focus on building energy use, the single largest source of direct

  8. Field Report: Long-Baseline Acoustic Navigation for Under-Ice AUV Operations

    E-Print Network [OSTI]

    Singh, Hanumant

    . The drifting pack ice made vehicle recovery more challenging and necessitated atypical adaptations relatively unexplored on account of its location beneath the permanent drifting Arctic ice pack. OurField Report: Long-Baseline Acoustic Navigation for Under-Ice AUV Operations Michael V. Jakuba

  9. Hazard categorization and baseline documentation for the Sodium Storage Facility. Revision 1

    SciTech Connect (OSTI)

    Bowman, B.R.

    1995-06-16T23:59:59.000Z

    Hazard Categorization evaluation has been performed in accordance with DOE-STD-1027 for the Sodium Storage Facility at FFTF and a determination of less than Category 3 or non-nuclear has been made. Hazard Baseline Documentation has been performed in accordance with DOE-EM-STD-5502 and a determination of ``Radiological Facility`` has been made.

  10. Effects of corticosterone pellets on baseline and stress-induced corticosterone and corticosteroid-binding-globulin

    E-Print Network [OSTI]

    Alvarez, Nadir

    Effects of corticosterone pellets on baseline and stress-induced corticosterone and corticosteroid-degradable corticosterone pellets (implanted under the skin) in elevating plasma corticosterone levels. We monitored to handling in Eurasian kestrel Falco tinnunculus and barn owl Tyto alba nestlings. Corticosterone pellets

  11. Dexou low pH plume baseline permeable reactive barrier options

    SciTech Connect (OSTI)

    Phifer, M.A.

    2000-06-20T23:59:59.000Z

    The current Environmental Restoration Department (ERD) Permeable Reactive Barrier (PRB) baseline configuration consists of a limestone trench and a granular cast iron trench in series. This report provides information relative to the use of PRB technology for the remediation of the D-Area low pH groundwater plumes.

  12. Energy Analysis, Baselining and Modeling of Prairie View A&M University 

    E-Print Network [OSTI]

    Abushakra, B.; Haberl, J. S.; Claridge, D. E.; Eggebrecht, J.; Carlson, K. A.

    1998-01-01T23:59:59.000Z

    Analysis of the available data found that electricity savings in the J.B. Coleman Library for June - September, 1998 were 298 MWh, or 38% of the baseline consumption during these months. Extrapolation of these savings to a full year leads would...

  13. The DOE Hydrogen Baseline Survey: Assessing Knowledge and Opinions about Hydrogen Technology

    E-Print Network [OSTI]

    and don't know about the hydrogen economy and hydrogen technologies. The data will ­ Guide educationThe DOE Hydrogen Baseline Survey: Assessing Knowledge and Opinions about Hydrogen Technology Christy Cooper U.S. Department of Energy Hydrogen Program #12;Overview Purpose: To learn what people know

  14. Numerical Modeling of CIGS Solar Cells: Definition of the Baseline and

    E-Print Network [OSTI]

    Sites, James R.

    Thesis Numerical Modeling of CIGS Solar Cells: Definition of the Baseline and Explanation our supervision by Markus Gloeckler entitled "Numerical Modeling of CIGS Solar Cells: Definition. A three-layer structure, simulating a Cu(InGa)Se2 (CIGS) heterojunction solar cell, was set up using

  15. NUMERICAL MODELING OF CIGS AND CdTe SOLAR CELLS: SETTING THE BASELINE

    E-Print Network [OSTI]

    Sites, James R.

    NUMERICAL MODELING OF CIGS AND CdTe SOLAR CELLS: SETTING THE BASELINE M. Gloeckler, A important complications that are often found in experimental CIGS and CdTe solar cells. 1. INTRODUCTION Numerical modeling of polycrystalline thin-film solar cells is an important strategy to test the viability

  16. ORIGINAL PAPER Arctic fisheries catches in Russia, USA, and Canada: baselines

    E-Print Network [OSTI]

    Pauly, Daniel

    years due to climate change. The Arctic is one of the last and most extensive ocean wilderness areas climate change pressures, is considerable. The United Nations Food and Agriculture Organization's (FAOORIGINAL PAPER Arctic fisheries catches in Russia, USA, and Canada: baselines for neglected

  17. US Department of Energy mixed waste characterization, treatment, and disposal focus area technical baseline development process

    SciTech Connect (OSTI)

    Roach, J.A.; Gombert, D. [Lockheed Martin Idaho Technologies, Idaho Falls, ID (United States)

    1996-12-31T23:59:59.000Z

    The US Department of Energy (DOE) created the Mixed Waste Characterization, Treatment, and Disposal Focus Area (MWFA) to develop and facilitate implementation of technologies required to meet its commitments for treatment of mixed wastes under the Federal Facility Compliance Act (FFCA), and in accordance with the Land Disposal Restrictions (LDR) of the Resource Conservation and Recovery Act (RCRA). Mixed wastes include both mixed low-level waste (MLLW) and mixed transuranic (MTRU) waste. The goal of the MWFA is to develop mixed waste treatment systems to the point of implementation by the Environmental Management (EM) customer. To accomplish this goal, the MWFA is utilizing a three step process. First, the treatment system technology deficiencies were identified and categorized. Second, these identified needs were prioritized. This resulted in a list of technical deficiencies that will be used to develop a technical baseline. The third step, the Technical Baseline Development Process, is currently ongoing. When finalized, the technical baseline will integrate the requirements associated with the identified needs into the planned and ongoing environmental research and technology development activities supported by the MWFA. Completion of this three-step process will result in a comprehensive technology development program that addresses customer identified and prioritized needs. The MWFA technical baseline will be a cost-effective, technically-defensible tool for addressing and resolving DOE`s mixed waste problems.

  18. LongBaseline Neutrino Physics and Astrophysics Institute for Nuclear Theory Summer Program 2010

    E-Print Network [OSTI]

    Washington at Seattle, University of - Department of Physics, Electroweak Interaction Research Group

    LongBaseline Neutrino Physics and Astrophysics Institute for Nuclear Theory Summer Program 2010 for Nuclear Theory Summer Program 2010 Robert J. Wilson 8/11/2010Page 2 Wednesday August 11th Session 6 PWG C520 14:00 Solar, Geo, and Reactor Neutrinos N. Tolich (Washington) 14:30 Q&A Guests/PWG Session 8

  19. Sandia National Laboratories/New Mexico Environmental Baseline update--Revision 1.0

    SciTech Connect (OSTI)

    NONE

    1996-07-01T23:59:59.000Z

    This report provides a baseline update to provide the background information necessary for personnel to prepare clear and consise NEPA documentation. The environment of the Sandia National Laboratories is described in this document, including the ecology, meteorology, climatology, seismology, emissions, cultural resources and land use, visual resources, noise pollution, transportation, and socioeconomics.

  20. Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit

    SciTech Connect (OSTI)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1996-03-01T23:59:59.000Z

    This document provides an overview of the Savannah River Site (SRS) and a description of the F-Area Burning/Rubble Pits (BRPs) and Rubble Pit (RP) unit. It also describes the objectives and scope of the baseline risk assessment (BRA).

  1. Baseline Suppression of Vehicle Portal Monitor Gamma Count Profiles: A Characterization Study

    SciTech Connect (OSTI)

    Lopresti, Charles A.; Weier, Dennis R.; Kouzes, Richard T.; Schweppe, John E.

    2006-06-15T23:59:59.000Z

    Radiation portal monitor (RPM) systems based upon polyvinyl toluene scintillator (PVT) gamma ray detectors have been deployed to detect illicit trafficking in radioactive materials at border crossings. This report sets forth a characterization of the baseline suppression effect in gross-count gamma ray profiles due to shadow shielding by vehicles entering radiation portal monitors. Shadow shielding is of interest because it reduces the alarm sensitivity of portal monitors. This observational study investigated three types of PVT based commercial RPM systems currently deployed at selected ports of entry in terms of spatial effects relative to detector panel orientation - driver versus passenger side, top versus bottom, and narrow lanes versus wide lanes - as observed for a large number of vehicles. Each portal site appears to have a distinctive baseline suppression signature, based on percent maximum suppression relative to measured background. Results suggest that alarm algorithms based on gross-counts may be further refined through attention to individual site characteristics. In addition, longer vehicle transit times were often correlated with stronger baseline suppression, suggesting that baseline suppression studies should take into account duration (length) of transit. (PIET-43741-TM-333-NIM)

  2. Optimization of the baseline and the parent muon energy for a low energy neutrino factory

    E-Print Network [OSTI]

    Amol Dighe; Srubabati Goswami; Shamayita Ray

    2012-10-05T23:59:59.000Z

    We discuss the optimal setup for a low energy neutrino factory in order to achieve a 5\\sigma-discovery of a nonzero mixing angle \\theta_{13}, a nonzero CP phase \\delta_{CP}, and the mass hierarchy. We explore parent muon energies in the range 5--16 GeV, and baselines in the range 500--5000 km. We present the results in terms of the reach in sin^2\\theta_{13}, emphasizing the dependence of the optimal baseline on the true value of \\delta_{CP}. We show that the sensitivity of a given setup typically increases with parent muon energy, reaching saturation for higher energies. The saturation energy is larger for longer baselines; we present an estimate of this dependence. In the light of the recent indications of a large \\theta_{13}, we also determine how these preferences would change if indeed a large \\theta_{13} is confirmed. In such a case, the baselines ~2500 km (~1500 km) may be expected to lead to hierarchy determination (\\delta_{CP} discovery) with the minimum exposure.

  3. Journal of Environmental Management 88 (2008) 348359 Baseline assessment for environmental services payments from satellite

    E-Print Network [OSTI]

    Quesada Avendaño, Mauricio

    to an increasing build-up of anthropogenic greenhouse gasses (GHG) such as carbon dioxide (CO2) in the atmosphere an ``assigned amount of emission reduction units'' (AAUs) that correspond to the nations' allowable GHG with transitional economies. The AAUs are a country's baseline emission minus the percentage of emission reductions

  4. Abstract This paper is part of a two-year study to investigate the feasibility of initiating a Clean Development Mechanism (CDM) project in an indigenous com-

    E-Print Network [OSTI]

    Bermingham, Eldredge

    -use/land-cover baseline scenario and examine the role of local participation in assessing land-use change. In Ipeti´, land of using local knowledge in the establishment of baseline data for CDM projects. Our calculations C. Potvin, Panama´, Panama´ T. Moore Department of Geography, McGill University, Montre´al, Canada 123 Mitig Adapt

  5. Abstract This paper is part of a two-year study to investigate the feasibility of initiating a Clean Development Mechanism (CDM) project in an indigenous com-

    E-Print Network [OSTI]

    Moore, Tim

    to the reduction of atmospheric carbon dioxide (CO2) while enhancing sustainable development in these host-use/land-cover baseline scenario and examine the role of local participation in assessing land-use change. In Ipeti´, land of using local knowledge in the establishment of baseline data for CDM projects. Our calculations C. Potvin

  6. Searches for short-baseline electron-neutrino oscillations in the SAGE and BOREXINO experiments involving artificial neutrino sources

    SciTech Connect (OSTI)

    Gorbachev, V. V., E-mail: vvgor_gfb1@mail.ru; Veretenkin, E. P.; Gavrin, V. N.; Dan’shin, S. N.; Ibragimova, T. V.; Kalikhov, A. V.; Knodel, T. V. [Russian Academy of Sciences, Institute for Nuclear Research (Russian Federation)

    2013-12-15T23:59:59.000Z

    The potential of the SAGE and BOREXINO experiments with {sup 51}Cr artificial neutrino sources for searches for and determination of parameters of short-baseline oscillations.

  7. Long-Baseline Neutrino Experiment (LBNE)Conceptual Design ReportThe LBNE Water Cherenkov DetectorApril 13 2012

    SciTech Connect (OSTI)

    Kettell S. H.; Bishai, M.; Brown, R.; Chen, H.; Diwan, M.; Dolph, J., Geronimo, G.; Gill, R.; Hackenburg, R.; Hahn, R.; Hans, S.; Isvan, Z.; Jaffe, D.; Junnarkar, S.; Kettell, S.H.; Lanni,F.; Li, Y.; Ling, J.; Littenberg, L.; Makowiecki, D.; Marciano, W.; Morse, W.; Parsa, Z.; Radeka, V.; Rescia, S.; Samios, N.; Sharma, R.; Simos, N.; Sondericker, J.; Stewart, J.; Tanaka, H.; Themann, H.; Thorn, C.; Viren, B., White, S.; Worcester, E.; Yeh, M.; Yu, B.; Zhang, C.

    2012-04-13T23:59:59.000Z

    Conceptual Design Report (CDR) developed for the Water Cherekov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  8. RCRA Facility Investigation/Remedial Investigation Report with the Baseline Risk Assessment for the 716-A Motor Shops Seepage Basin

    SciTech Connect (OSTI)

    Palmer, E.

    1997-08-25T23:59:59.000Z

    This document describes the RCRA Facility Investigation/Remedial Investigation/Baseline Risk Assessment of the 716-A Motor Shops Seepage Basin.

  9. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  10. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  11. Fiscalini Farms Biomass Energy Project

    SciTech Connect (OSTI)

    William Stringfellow; Mary Kay Camarillo; Jeremy Hanlon; Michael Jue; Chelsea Spier

    2011-09-30T23:59:59.000Z

    In this final report describes and documents research that was conducted by the Ecological Engineering Research Program (EERP) at the University of the Pacific (Stockton, CA) under subcontract to Fiscalini Farms LP for work under the Assistance Agreement DE-EE0001895 'Measurement and Evaluation of a Dairy Anaerobic Digestion/Power Generation System' from the United States Department of Energy, National Energy Technology Laboratory. Fiscalini Farms is operating a 710 kW biomass-energy power plant that uses bio-methane, generated from plant biomass, cheese whey, and cattle manure via mesophilic anaerobic digestion, to produce electricity using an internal combustion engine. The primary objectives of the project were to document baseline conditions for the anaerobic digester and the combined heat and power (CHP) system used for the dairy-based biomass-energy production. The baseline condition of the plant was evaluated in the context of regulatory and economic constraints. In this final report, the operation of the plant between start-up in 2009 and operation in 2010 are documented and an interpretation of the technical data is provided. An economic analysis of the biomass energy system was previously completed (Appendix A) and the results from that study are discussed briefly in this report. Results from the start-up and first year of operation indicate that mesophilic anaerobic digestion of agricultural biomass, combined with an internal combustion engine, is a reliable source of alternative electrical production. A major advantage of biomass energy facilities located on dairy farms appears to be their inherent stability and ability to produce a consistent, 24 hour supply of electricity. However, technical analysis indicated that the Fiscalini Farms system was operating below capacity and that economic sustainability would be improved by increasing loading of feedstocks to the digester. Additional operational modifications, such as increased utilization of waste heat and better documentation of potential of carbon credits, would also improve the economic outlook. Analysis of baseline operational conditions indicated that a reduction in methane emissions and other greenhouse gas savings resulted from implementation of the project. The project results indicate that using anaerobic digestion to produce bio-methane from agricultural biomass is a promising source of electricity, but that significant challenges need to be addressed before dairy-based biomass energy production can be fully integrated into an alternative energy economy. The biomass energy facility was found to be operating undercapacity. Economic analysis indicated a positive economic sustainability, even at the reduced power production levels demonstrated during the baseline period. However, increasing methane generation capacity (via the importation of biomass codigestate) will be critical for increasing electricity output and improving the long-term economic sustainability of the operation. Dairy-based biomass energy plants are operating under strict environmental regulations applicable to both power-production and confined animal facilities and novel approached are being applied to maintain minimal environmental impacts. The use of selective catalytic reduction (SCR) for nitrous oxide control and a biological hydrogen sulfide control system were tested at this facility. Results from this study suggest that biomass energy systems can be compliant with reasonable scientifically based air and water pollution control regulations. The most significant challenge for the development of biomass energy as a viable component of power production on a regional scale is likely to be the availability of energy-rich organic feedstocks. Additionally, there needs to be further development of regional expertise in digester and power plant operations. At the Fiscalini facility, power production was limited by the availability of biomass for methane generation, not the designed system capacity. During the baseline study period, feedstocks included manure, sudan grass silage, and

  12. The Microbase Value-Added Product: A Baseline Retrieval of Cloud Microphysical Properties

    SciTech Connect (OSTI)

    Dunn, M; Johnson, K; Jensen, M

    2011-05-31T23:59:59.000Z

    This report describes the Atmospheric Radiation Measurement (ARM) Climate Research Facility baseline cloud microphysical properties (MICROBASE) value-added product (VAP). MICROBASE uses a combination of millimeter-wavelength cloud radar, microwave radiometer, and radiosonde observations to estimate the vertical profiles of the primary microphysical parameters of clouds including the liquid/ice water content and liquid/ice cloud particle effective radius. MICROBASE is a baseline algorithm designed to apply to most conditions and locations using a single set of parameterizations and a simple determination of water phase based on temperature. This document provides the user of this product with guidelines to assist in determining the accuracy of the product under certain conditions. Quality control flags are designed to identify outliers and indicate instances where the retrieval assumptions may not be met. The overall methodology is described in this report through a detailed description of the input variables, algorithms, and output products.

  13. Four-neutrino analysis of 1.5km-baseline reactor antineutrino oscillations

    E-Print Network [OSTI]

    Kang, Sin Kyu; Ko, Young-Ju; Siyeon, Kim

    2014-01-01T23:59:59.000Z

    The masses of sterile neutrinos are not yet known, and depending on the orders of magnitudes, their existence may explain reactor anomalies or the spectral shape of reactor neutrino events at 1.5km-baseline detector. Here, we present four-neutrino analysis of the results announced by RENO and Daya Bay, which performed the definitive measurements of $\\theta_{13}$ based on the disappearance of reactor antineutrinos at km-order baselines. Our results using 3+1 scheme include the exclusion curve of $\\Delta m^2_{41}$ vs. $\\theta_{14}$ and the adjustment of $\\theta_{13}$ due to correlation with $\\theta_{14}$. The value of $\\theta_{13}$ obtained by RENO and Daya Bay with a three-neutrino oscillation analysis is included in the $1\\sigma$ interval of $\\theta_{13}$ allowed by our four-neutrino analysis.

  14. Four-neutrino analysis of 1.5km-baseline reactor antineutrino oscillations

    E-Print Network [OSTI]

    Sin Kyu Kang; Yeong-Duk Kim; Young-Ju Ko; Kim Siyeon

    2014-08-19T23:59:59.000Z

    The masses of sterile neutrinos are not yet known, and depending on the orders of magnitudes, their existence may explain reactor anomalies or the spectral shape of reactor neutrino events at 1.5km-baseline detector. Here, we present four-neutrino analysis of the results announced by RENO and Daya Bay, which performed the definitive measurements of $\\theta_{13}$ based on the disappearance of reactor antineutrinos at km-order baselines. Our results using 3+1 scheme include the exclusion curve of $\\Delta m^2_{41}$ vs. $\\theta_{14}$ and the adjustment of $\\theta_{13}$ due to correlation with $\\theta_{14}$. The value of $\\theta_{13}$ obtained by RENO and Daya Bay with a three-neutrino oscillation analysis is included in the $1\\sigma$ interval of $\\theta_{13}$ allowed by our four-neutrino analysis.

  15. Integrated Baseline System (IBS). Version 2.0, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States); Bower, J.C. [Bower Software Services, Kennewick, WA (United States)

    1994-03-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This User Guide explains how to start and use the IBS program, which is designed to help civilian emergency management personnel to plan for and support their responses to a chemical-releasing event at a military chemical stockpile. The intended audience for this document is all users of the IBS, especially emergency management planners and analysts.

  16. Poor Baseline Pulmonary Function May Not Increase the Risk of Radiation-Induced Lung Toxicity

    SciTech Connect (OSTI)

    Wang, Jingbo [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States) [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States); Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China); Cao, Jianzhong [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China)] [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China); Yuan, Shuanghu [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States)] [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States); Ji, Wei [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China)] [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China); Arenberg, Douglas [Department of Internal Medicine, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States)] [Department of Internal Medicine, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States); Dai, Jianrong [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China)] [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China); Stanton, Paul; Tatro, Daniel; Ten Haken, Randall K. [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States)] [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States); Wang, Luhua, E-mail: wlhwq@yahoo.com [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China)] [Department of Radiation Oncology, Cancer Hospital, Chinese Academic Medical Sciences and Peking Union Medical College, Beijing (China); Kong, Feng-Ming, E-mail: fengkong@med.umich.edu [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States)] [Department of Radiation Oncology, University of Michigan/Ann Arbor Veterans Health System, Ann Arbor, Michigan (United States)

    2013-03-01T23:59:59.000Z

    Purpose: Poor pulmonary function (PF) is often considered a contraindication to definitive radiation therapy for lung cancer. This study investigated whether baseline PF was associated with radiation-induced lung toxicity (RILT) in patients with non-small cell lung cancer (NSCLC) receiving conformal radiation therapy (CRT). Methods and Materials: NSCLC patients treated with CRT and tested for PF at baseline were eligible. Baseline predicted values of forced expiratory volume in 1 sec (FEV1), forced vital capacity (FVC), and diffusion capacity of lung for carbon monoxide (DLCO) were analyzed. Additional factors included age, gender, smoking status, Karnofsky performance status, coexisting chronic obstructive pulmonary disease (COPD), tumor location, histology, concurrent chemotherapy, radiation dose, and mean lung dose (MLD) were evaluated for RILT. The primary endpoint was symptomatic RILT (SRILT), including grade ?2 radiation pneumonitis and fibrosis. Results: There was a total of 260 patients, and SRILT occurred in 58 (22.3%) of them. Mean FEV1 values for SRILT and non-SRILT patients were 71.7% and 65.9% (P=.077). Under univariate analysis, risk of SRILT increased with MLD (P=.008), the absence of COPD (P=.047), and FEV1 (P=.077). Age (65 split) and MLD were significantly associated with SRILT in multivariate analysis. The addition of FEV1 and age with the MLD-based model slightly improved the predictability of SRILT (area under curve from 0.63-0.70, P=.088). Conclusions: Poor baseline PF does not increase the risk of SRILT, and combining FEV1, age, and MLD may improve the predictive ability.

  17. Baseline Report for the Fort Hood Army Base: September 2003 to October 2004

    E-Print Network [OSTI]

    Haberl, J. S.; Liu, Z.

    2007-09-21T23:59:59.000Z

    December 2004 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University System Ft. Hood Baseline Report, p. 1 December 2004 Energy Systems Laboratory, Texas A&M University PREFACE This report... building was also initiated in November of 2001 and completed in 2002. The data from Central Thermal Power Plant (87000), III Corp building, Darnall Hospital 1 , Main Substation, West Substation, and North Substation are plotted and reported...

  18. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect (OSTI)

    Not Available

    1989-09-01T23:59:59.000Z

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  19. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-06-20T23:59:59.000Z

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  20. Circular polarization control for the LCLS baseline in the soft X-ray regime

    E-Print Network [OSTI]

    Geloni, Gianluca; Saldin, Evgeni

    2010-01-01T23:59:59.000Z

    The LCLS baseline includes a planar undulator system, producing linearly polarized light in the range 0.15-1.5 nm. Polarization control in the soft X-ray region from linear to circular is highly desirable. Several schemes using helical undulators have been discussed for the LCLS. One consists in replacing three of the last planar undulator segments by APPLE III. A second proposal, the 2nd harmonic helical afterburner, uses short, crossed undulators tuned to the second harmonic. This last scheme is expected to be the better one. Its advantages are a high and stable degree of circular polarization and a low cost. Its disadvantage is a small output power and a narrow wavelength range. We propose a novel method to generate 10 GW level power at the fundamental harmonic with 99% degree of circular polarization from the LCLS baseline. Its merits are low cost, simplicity and easy implementation. After the baseline undulator, the electron beam is sent through a 40 m long straight section, and subsequently passes throu...

  1. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  2. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  3. ERIS Project 

    E-Print Network [OSTI]

    Hunter, Philip

    repositories. If these (generally) smaller institutions wished to continue to have access to these hosted repository spaces after the end of the project, it was proposed that these repository-lite services would be administered by the SDLC (the Scottish Digital...

  4. Methodological Issues In Forestry Mitigation Projects: A CaseStudy Of Kolar District

    SciTech Connect (OSTI)

    Ravindranath, N.H.; Murthy, I.K.; Sudha, P.; Ramprasad, V.; Nagendra, M.D.V.; Sahana, C.A.; Srivathsa, K.G.; Khan, H.

    2007-06-01T23:59:59.000Z

    There is a need to assess climate change mitigationopportunities in forest sector in India in the context of methodologicalissues such as additionality, permanence, leakage, measurement andbaseline development in formulating forestry mitigation projects. A casestudy of forestry mitigation project in semi-arid community grazing landsand farmlands in Kolar district of Karnataka, was undertaken with regardto baseline and project scenariodevelopment, estimation of carbon stockchange in the project, leakage estimation and assessment ofcost-effectiveness of mitigation projects. Further, the transaction coststo develop project, and environmental and socio-economic impact ofmitigation project was assessed.The study shows the feasibility ofestablishing baselines and project C-stock changes. Since the area haslow or insignificant biomass, leakage is not an issue. The overallmitigation potential in Kolar for a total area of 14,000 ha under variousmitigation options is 278,380 tC at a rate of 20 tC/ha for the period2005-2035, which is approximately 0.67 tC/ha/yr inclusive of harvestregimes under short rotation and long rotation mitigation options. Thetransaction cost for baseline establishment is less than a rupee/tC andfor project scenario development is about Rs. 1.5-3.75/tC. The projectenhances biodiversity and the socio-economic impact is alsosignificant.

  5. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  6. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  7. Lawrence Livermore National Laboratory Emergency Response Capability Baseline Needs Assessment Requirement Document

    SciTech Connect (OSTI)

    Sharry, J A

    2009-12-30T23:59:59.000Z

    This revision of the LLNL Fire Protection Baseline Needs Assessment (BNA) was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by Martin Gresho, Sandia/CA Fire Marshal. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response. The original LLNL BNA was created on April 23, 1997 as a means of collecting all requirements concerning emergency response capabilities at LLNL (including response to emergencies at Sandia/CA) into one BNA document. The original BNA documented the basis for emergency response, emergency personnel staffing, and emergency response equipment over the years. The BNA has been updated and reissued five times since in 1998, 1999, 2000, 2002, and 2004. A significant format change was performed in the 2004 update of the BNA in that it was 'zero based.' Starting with the requirement documents, the 2004 BNA evaluated the requirements, and determined minimum needs without regard to previous evaluations. This 2010 update maintains the same basic format and requirements as the 2004 BNA. In this 2010 BNA, as in the previous BNA, the document has been intentionally divided into two separate documents - the needs assessment (1) and the compliance assessment (2). The needs assessment will be referred to as the BNA and the compliance assessment will be referred to as the BNA Compliance Assessment. The primary driver for separation is that the needs assessment identifies the detailed applicable regulations (primarily NFPA Standards) for emergency response capabilities based on the hazards present at LLNL and Sandia/CA and the geographical location of the facilities. The needs assessment also identifies areas where the modification of the requirements in the applicable NFPA standards is appropriate, due to the improved fire protection provided, the remote location and low population density of some the facilities. As such, the needs assessment contains equivalencies to the applicable requirements. The compliance assessment contains no such equivalencies and simply assesses the existing emergency response resources to the requirements of the BNA and can be updated as compliance changes independent of the BNA update schedule. There are numerous NFPA codes and standards and other requirements and guidance documents that address the subject of emergency response. These requirements documents are not always well coordinated and may contain duplicative or conflicting requirements or even coverage gaps. Left unaddressed, this regulatory situation results in frequent interpretation of requirements documents. Different interpretations can then lead to inconsistent implementation. This BNA addresses this situation by compiling applicable requirements from all identified sources (see Section 5) and analyzing them collectively to address conflict and overlap as applicable to the hazards presented by the LLNL and Sandia/CA sites (see Section 7). The BNA also generates requirements when needed to fill any identified gaps in regulatory coverage. Finally, the BNA produces a customized simple set of requirements, appropriate for the DOE protection goals, such as those defined in DOE O 420.1B, the hazard level, the population density, the topography, and the site layout at LLNL and Sandia/CA that will be used as the baseline requirements set - the 'baseline needs' - for emergency response at LLNL and Sandia/CA. A template approach is utilized to accomplish this evaluation for each of the nine topical areas that comprise the baseline needs for emergency response. The basis for conclusions reached in determining the baseline needs for each of the topical areas is presented in Sections 7.1 through 7.9. This BNA identifies only mandatory requirements and establishes the minimum performance criteria. The minimum performance criteria may not be the level of performance desired Lawrence Livermore National Laboratory or Sandia/CA

  8. Investigation of neutrino oscillations in the T2k long-baseline accelerator experiment

    SciTech Connect (OSTI)

    Izmaylov, A. O., E-mail: izmaylov@inr.ru; Yershov, N. V.; Kudenko, Yu. G.; Matveev, V. A.; Mineev, O. V.; Musienko, Yu. V.; Khabibulliun, M. M.; Khotjantsev, A. N.; Shaykhiev, A. T. [Russian Academy of Sciences, Institute for Nuclear Research (Russian Federation)

    2012-02-15T23:59:59.000Z

    High-sensitivity searches for transitions of muon neutrinos to electron neutrinos are the main task of the T2K (Tokai-to-Kamioka) second-generation long-baseline accelerator neutrino experiment. The present article is devoted to describing basic principles of T2K, surveying experimental apparatuses that it includes, and considering in detail the muon-range detector (SMRD) designed and manufactured by a group of physicists from the Institute of Nuclear Research (Russian Academy of Sciences, Moscow). The results of the first measurements with a neutrino beam are presented, and plans for the near future are discussed.

  9. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)] Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)] Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01T23:59:59.000Z

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  10. Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States

    E-Print Network [OSTI]

    Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.

    1996-01-01T23:59:59.000Z

    3/96-Final Report, p. i ESL-TR-96/03-01 DEVELOPMENT AND USE OF BASELINE MONTHLY UTILITY MODELS FOR EIGHT ARMY INSTALLATIONS AROUND THE UNITED STATES Prepared by: T.A. Reddy, N.F. Saman, D.E. Claridge, J.S. Haberl and W.D. Turner Research Sponsored... and Scope 2 2.1 Objectives 2 2.2 Data provided 3 2.3 Scope of study 7 3.0 Mathematical Basis of Regression Models 8 3.1 Pertinent background 8 3.2 Simple regression models using Emodel 9 3.3 Generation of 95% uncertainty bands for individual months 14 3...

  11. Tests of Lorentz and CPT Violation in the Medium Baseline Reactor Antineutrino Experiment

    E-Print Network [OSTI]

    Yu-Feng Li; Zhen-hua Zhao

    2014-11-21T23:59:59.000Z

    Tests of Lorentz and CPT violation in the medium baseline reactor antineutrino experiment are presented in the framework of the Standard Model Extension (SME). Both the spectral distortion and sidereal variation are employed to derive the limits of Lorentz violation (LV) coefficients. We do the numerical analysis of the sensitivity of LV coefficients by taking the Jiangmen Underground Neutrino Observatory (JUNO) as an illustration, which can improve the sensitivity by more than two orders of magnitude compared with the current limits from reactor antineutrino experiments.

  12. Formation and Sustainment of ITPs in ITER with the Baseline Heating Mix

    SciTech Connect (OSTI)

    Francesca M. Poli and Charles Kessel

    2012-12-03T23:59:59.000Z

    Plasmas with internal transport barriers (ITBs) are a potential and attractive route to steady-state operation in ITER. These plasmas exhibit radially localized regions of improved con nement with steep pressure gradients in the plasma core, which drive large bootstrap current and generate hollow current pro les and negative shear. This work examines the formation and sustainment of ITBs in ITER with electron cyclotron heating and current drive. It is shown that, with a trade-o of the power delivered to the equatorial and to the upper launcher, the sustainment of steady-state ITBs can be demonstrated in ITER with the baseline heating con guration.

  13. SciTech Connect: "long baseline neutrino experiment"

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem Not Found ItemRomero-Redondo, C"Voth,Jaehoon"Zhu, Jian -long baseline

  14. Coastal and Marine Nitrogen Sources Shift Isotopic Baselines in Pelagic Food Webs of the Gulf of Mexico

    E-Print Network [OSTI]

    Dorado, Samuel

    2012-07-16T23:59:59.000Z

    variability to the degree of freshwater influence. Published food web data from these two environments were then assessed to establish whether isotopic baseline shifts observed in our data occur at an ecosystem level. Isotope values of the POM...

  15. Using Near Detector Data to Make Far Detector Predictions in an On-Axis Long-Baseline Experiment

    SciTech Connect (OSTI)

    Whitehead, L. [Brookhaven National Laboratory, Upton, New York 11973 (United States)

    2011-10-06T23:59:59.000Z

    Various techniques have been developed in long-baseline neutrino oscillation experiments to leverage near detector data to form predictions for the far detector spectrum and backgrounds. I will review the techniques used in MINOS, an on-axis long-baseline neutrino experiment that uses Fermilab's NuMI beam. The extrapolation methods used in the MINOS muon neutrino and anti-neutrino disappearance measurements and electron neutrino appearance search will be covered.

  16. Climate Co-benefits of Tighter SO2 and NOx Regulations in China

    E-Print Network [OSTI]

    Nam, Kyung-Min

    2012-10-01T23:59:59.000Z

    Air pollution has been recognized as a significant problem in China. In its Twelfth Five Year Plan (FYP), China proposes to reduce SO2 and NOx emissions significantly, and here we investigate the cost of achieving those ...

  17. Cleaning the Bathwater with the Baby: The Health Co-Benefits of Carbon Pricing in Transportation

    E-Print Network [OSTI]

    Knittel, Christopher R,

    Efforts to reduce greenhouse gas emissions in the US have relied on Corporate Average Fuel Economy (CAFE) Standards and Renewable Fuel Standards (RFS). Economists often argue that these policies are inefficient relative ...

  18. Quantifying the Comprehensive Greenhouse Gas Co-Benefits of Green Buildings

    E-Print Network [OSTI]

    Mozingo, Louise; Arens, Ed

    2014-01-01T23:59:59.000Z

    2010.     California  Green  Building  Standards  Code,  Team].    2008.   Green  Building  Sector  Subgroup:  cellular  data.  Green  Building  Information   Gateway  (

  19. Climate change mitigation and co-benefits of feasible transport demand policies in Beijing

    E-Print Network [OSTI]

    Kammen, Daniel M.

    i n f o Keywords: Climate change mitigation Transport demand management External costs Urban and potential impacts of travel demand management help to define policy instruments that mitigate the damaging. The paper investi- gates the role of demand elasticities and demonstrates that joint demand and supply-side

  20. Quantifying the Comprehensive Greenhouse Gas Co-Benefits of Green Buildings

    E-Print Network [OSTI]

    Mozingo, Louise; Arens, Ed

    2014-01-01T23:59:59.000Z

    Change  Scoping  Plan:  Building   on  the  Framework.  Cities.   California  Building  Standards  Commission.    California  Green  Building  Standards  Code,   2010.    

  1. Manual for Quantitative Evaluation of the Co-Benefits Approach to Climate

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant Jump to:LandownersLuther,Jemez PuebloManteca, California: EnergyChange | Open Energy

  2. JICA's Assistance for Mitigation to Climate Change - The Co-Benefits

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup | OpenHunanInformation sourceInvensysIsland GasItron

  3. Accounting for Co-benefits in Asia's Transportation Sector: Methods and

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDITCaliforniaWeifangwiki HomeASN PowerApplications | Open Energy

  4. PROJECT SUMMARY

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management PlanPROJECT SUMMARY 1

  5. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013Project

  6. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENA creates

  7. Project Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagement

  8. Projects | ORNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn ThisPages

  9. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report: HPC-Colony IIProject Gnome

  10. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject FinalFluids |Storage Research and

  11. NEPA COMPLIANCE SURVEY Project Information Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description include anything that...

  12. Comprehensive baseline environmental audit of former underground test areas in Colorado, Nevada, and New Mexico

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    This report documents the results of the Comprehensive Baseline Environmental Audit of Former Underground Test Areas (FUTAS) in the States of Colorado, Nevada, and New Mexico. DOE and contractor systems for management of environmental protection activities on the Nevada Test Site (NTS) were not within the scope of the audit. The audit was conducted May 16-May 26, 1994, by the Office of Environmental Audit (EH-24). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program{close_quotes}, establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is to enhance environmental protection and minimize risk to public health and the environment. EH-24 accomplishes its mission using systematic and periodic evaluations of DOE`s environmental programs within line organizations and supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. These evaluations function as a vehicle through which the Secretary and program managers are apprised of the status and vulnerabilities of Departmental environmental activities and environmental management systems. Several types of evaluations are conducted, including: (1) comprehensive baseline environmental audits; (2) routine environmental audits; (3) environmental management assessments; and (4) special issue reviews.

  13. PROSPECT - A Precision Reactor Oscillation and Spectrum Experiment at Short Baselines

    E-Print Network [OSTI]

    J. Ashenfelter; A. B. Balantekin; H. R. Band; G. Barclay; C. Bass; N. S. Bowden; C. D. Bryan; J. J. Cherwinka; R. Chu; T. Classen; D. Davee; D. Dean; G. Deichert; M. Diwan; M. J. Dolinski; J. Dolph; D. A. Dwyer; Y. Efremenko; S. Fan; A. Galindo-Uribarri; K. Gilje; A. Glenn; M. Green; K. Han; S. Hans; K. M. Heeger; B. Heffron; L. Hu; P. Huber; D. E. Jaffe; Y. Kamyshkov; S. Kettell; C. Lane; T. J. Langford; B. R. Littlejohn; D. Martinez; R. D. McKeown; M. P. Mendenhall; S. Morrell; P. Mueller; H. P. Mumm; J. Napolitano; J. S. Nico; D. Norcini; D. Pushin; X. Qian; E. Romero; R. Rosero; B. S. Seilhan; R. Sharma; P. T. Surukuchi; S. J. Thompson; R. L. Varner; B. Viren; W. Wang; B. White; C. White; J. Wilhelmi; C. Williams; R. E. Williams; T. Wise; H. Yao; M. Yeh; N. Zaitseva; C. Zhang; X. Zhang

    2015-01-27T23:59:59.000Z

    Current models of antineutrino production in nuclear reactors predict detection rates and spectra at odds with the existing body of direct reactor antineutrino measurements. High-resolution antineutrino detectors operated close to compact research reactor cores can produce new precision measurements useful in testing explanations for these observed discrepancies involving underlying nuclear or new physics. Absolute measurement of the 235U-produced antineutrino spectrum can provide additional constraints for evaluating the accuracy of current and future reactor models, while relative measurements of spectral distortion between differing baselines can be used to search for oscillations arising from the existence of eV-scale sterile neutrinos. Such a measurement can be performed in the United States at several highly-enriched uranium fueled research reactors using near-surface segmented liquid scintillator detectors. We describe here the conceptual design and physics potential of the PROSPECT experiment, a U.S.-based, multi-phase experiment with reactor-detector baselines of 7-20 meters capable of addressing these and other physics and detector development goals. Current R&D status and future plans for PROSPECT detector deployment and data-taking at the High Flux Isotope Reactor at Oak Ridge National Laboratory will be discussed.

  14. Carrier-phase Two-Way Satellite Frequency Transfer over a Very Long Baseline

    E-Print Network [OSTI]

    Fujieda, M; Gotoh, T; Becker, J; Aida, M; Bauch, A

    2014-01-01T23:59:59.000Z

    In this paper we report that carrier-phase two-way satellite time and frequency transfer (TWSTFT) was successfully demonstrated over a very long baseline of 9,000 km, established between the National Institute of Information and Communications Technology (NICT) and the Physikalisch-Technische Bundesanstalt (PTB). We verified that the carrier-phase TWSTFT (TWCP) result agreed with those obtained by conventional TWSTFT and GPS carrier-phase (GPSCP) techniques. Moreover, a much improved short-term instability for frequency transfer of $2\\times10^{-13}$ at 1 s was achieved, which is at the same level as previously confirmed over a shorter baseline within Japan. The precision achieved was so high that the effects of ionospheric delay became significant which are ignored in conventional TWSTFT even over a long link. We compensated for these effects using ionospheric delays computed from regional vertical total electron content maps. The agreement between the TWCP and GPSCP results was improved because of this compe...

  15. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    SciTech Connect (OSTI)

    J. H. Jackson; S. P. Teysseyre

    2012-02-01T23:59:59.000Z

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  16. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    SciTech Connect (OSTI)

    J. H. Jackson; S. P. Teysseyre

    2012-10-01T23:59:59.000Z

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  17. Testing matter effects in propagation of atmospheric and long-baseline neutrinos

    E-Print Network [OSTI]

    M. C. Gonzalez-Garcia; Michele Maltoni; Jordi Salvado

    2011-05-07T23:59:59.000Z

    We quantify our current knowledge of the size and flavor structure of the matter effects in the evolution of atmospheric and long-baseline neutrinos based solely on the analysis of the corresponding neutrino data. To this aim we generalize the matter potential of the Standard Model by rescaling its strength, rotating it away from the e-e sector, and rephasing it with respect to the vacuum term. This phenomenological parametrization can be easily translated in terms of non-standard neutrino interactions in matter. We show that in the most general case, the strength of the potential cannot be determined solely by atmospheric and long-baseline data. However its flavor composition is very much constrained and the present determination of the neutrino masses and mixing is robust under its presence. We also present an update of the constraints arising from this analysis in the particular case in which no potential is present in the e-mu and e-tau sectors. Finally we quantify to what degree in this scenario it is possible to alleviate the tension between the oscillation results for neutrinos and antineutrinos in the MINOS experiment and show the relevance of the high energy part of the spectrum measured at MINOS.

  18. Nonstandard interaction effects on neutrino parameters at medium-baseline reactor antineutrino experiments

    E-Print Network [OSTI]

    Tommy Ohlsson; He Zhang; Shun Zhou

    2014-09-23T23:59:59.000Z

    Precision measurements of leptonic mixing parameters and the determination of the neutrino mass hierarchy are the primary goals of the forthcoming medium-baseline reactor antineutrino experiments, such as JUNO and RENO-50. In this work, we investigate the impact of nonstandard neutrino interactions (NSIs) on the measurements of {sin^2 theta_{12}, Delta m^2_{21}} and {sin^2 theta_{13}, Delta m^2_{31}}, and on the sensitivity to the neutrino mass hierarchy, at the medium-baseline reactor experiments by assuming a typical experimental setup. It turns out that the true mixing parameter sin^2 theta_{12} can be excluded at a more than 3 sigma level if the NSI parameter varepsilon_{e mu} or varepsilon_{e tau} is as large as 2% in the most optimistic case. However, the discovery reach of NSI effects has been found to be small, and depends crucially on the CP-violating phases. Finally, we show that NSI effects could enhance or reduce the discrimination power of the JUNO and RENO-50 experiments between the normal and inverted neutrino mass hierarchies.

  19. Baseline Design Compliance Matrix for the Rotary Mode Core Sampling System

    SciTech Connect (OSTI)

    LECHELT, J.A.

    2000-10-17T23:59:59.000Z

    The purpose of the design compliance matrix (DCM) is to provide a single-source document of all design requirements associated with the fifteen subsystems that make up the rotary mode core sampling (RMCS) system. It is intended to be the baseline requirement document for the RMCS system and to be used in governing all future design and design verification activities associated with it. This document is the DCM for the RMCS system used on Hanford single-shell radioactive waste storage tanks. This includes the Exhauster System, Rotary Mode Core Sample Trucks, Universal Sampling System, Diesel Generator System, Distribution Trailer, X-Ray Cart System, Breathing Air Compressor, Nitrogen Supply Trailer, Casks and Cask Truck, Service Trailer, Core Sampling Riser Equipment, Core Sampling Support Trucks, Foot Clamp, Ramps and Platforms and Purged Camera System. Excluded items are tools such as light plants and light stands. Other items such as the breather inlet filter are covered by a different design baseline. In this case, the inlet breather filter is covered by the Tank Farms Design Compliance Matrix.

  20. Fiscal year 1996 U.S. Department of Energy, Richland Operations Office Site summary baseline

    SciTech Connect (OSTI)

    Johndro-Collins, A.

    1995-10-01T23:59:59.000Z

    The technical baseline is a hierarchical description of the Hanford Site cleanup mission. This technical baseline does not address the science, technology, or economic transition missions. It begins with a definition of the existing conditions at the Hanford Site, provides a description of the end product or mission accomplishments at completion, presents a statement of the major requirements and constraints that must be observed during the performance of the mission, and provides a statement of the top-level strategic approach to accomplish the mission. Mission-level interfaces are also described. This information is further defined hierarchically in increasing levels of detail. This definition is composed of the following major elements: functions that are key task descriptions; requirements that are the measurable standards to which the functions must be performed; architectures which are specific engineering solutions or systems that perform the functions described earlier; and verification ensuring the system satisfies the requirements and fulfills the functions. The above information is supplemented with the following: interface data; risk analyses and watch lists; assumptions; and required analyses.

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Maybell, Colorado

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, building foundations, and materials associated with the former processing of uranium ore at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further contamination of ground water. One UMTRA Project site is near Maybell, Colorado. Surface cleanup at this site began in 1995 and is scheduled for completion in 1996. The tailings are being stabilized in place at this site. The disposal area has been withdrawn from public use by the DOE and is referred to as the permanent withdrawal area. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from past uranium ore processing activities. The Ground Water Project at this site is in its beginning stages. This report is a site-specific document that will be used to evaluate current and future potential impacts to the public and the environment from exposure to contaminated ground water. The results presented in this document and other evaluations will determine whether any action is needed to protect human health or the environment.

  2. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05T23:59:59.000Z

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  3. Livingston Solar Canopy Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    ,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

  4. Information Visualization Graduate Project (Group Project)

    E-Print Network [OSTI]

    Rusu, Adrian

    Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

  5. Baseline data for the residential sector and development of a residential forecasting database

    SciTech Connect (OSTI)

    Hanford, J.W.; Koomey, J.G.; Stewart, L.E.; Lecar, M.E.; Brown, R.E.; Johnson, F.X.; Hwang, R.J.; Price, L.K.

    1994-05-01T23:59:59.000Z

    This report describes the Lawrence Berkeley Laboratory (LBL) residential forecasting database. It provides a description of the methodology used to develop the database and describes the data used for heating and cooling end-uses as well as for typical household appliances. This report provides information on end-use unit energy consumption (UEC) values of appliances and equipment historical and current appliance and equipment market shares, appliance and equipment efficiency and sales trends, cost vs efficiency data for appliances and equipment, product lifetime estimates, thermal shell characteristics of buildings, heating and cooling loads, shell measure cost data for new and retrofit buildings, baseline housing stocks, forecasts of housing starts, and forecasts of energy prices and other economic drivers. Model inputs and outputs, as well as all other information in the database, are fully documented with the source and an explanation of how they were derived.

  6. Quality Assurance Baseline Assessment Report to Los Alamos National Laboratory Analytical Chemistry Operations

    SciTech Connect (OSTI)

    Jordan, R. A.

    1998-09-01T23:59:59.000Z

    This report summarizes observations that were made during a Quality Assurance (QA) Baseline Assessment of the Nuclear Materials Technology Analytical Chemistry Group (NMT-1). The Quality and Planning personnel, for NMT-1, are spending a significant amount of time transitioning out of their roles of environmental oversight into production oversight. A team from the Idaho National Engineering and Environmental Laboratory Defense Program Environmental Surety Program performed an assessment of the current status of the QA Program. Several Los Alamos National Laboratory Analytical Chemistry procedures were reviewed, as well as Transuranic Waste Characterization Program (TWCP) QA documents. Checklists were developed and the assessment was performed according to an Implementation Work Plan, INEEL/EXT-98-00740.

  7. A Long Baseline Neutrino Oscillation Experiment Using J-PARC Neutrino Beam and Hyper-Kamiokande

    E-Print Network [OSTI]

    :,; Aihara, H; Andreopoulos, C; Anghel, I; Ariga, A; Ariga, T; Asfandiyarov, R; Askins, M; Back, J J; Ballett, P; Barbi, M; Barker, G J; Barr, G; Bay, F; Beltrame, P; Berardi, V; Bergevin, M; Berkman, S; Berry, T; Bhadra, S; Blaszczyk, F d M; Blondel, A; Bolognesi, S; Boyd, S B; Bravar, A; Bronner, C; Cafagna, F S; Carminati, G; Cartwright, S L; Catanesi, M G; Choi, K; Choi, J H; Collazuol, G; Cowan, G; Cremonesi, L; Davies, G; De Rosa, G; Densham, C; Detwiler, J; Dewhurst, D; Di Lodovico, F; Di Luise, S; Drapier, O; Emery, S; Ereditato, A; Fernandez, P; Feusels, T; Finch, A; Fitton, M; Friend, M; Fujii, Y; Fukuda, Y; Fukuda, D; Galymov, V; Ganezer, K; Gonin, M; Gumplinger, P; Hadley, D R; Haegel, L; Haesler, A; Haga, Y; Hartfiel, B; Hartz, M; Hayato, Y; Hierholzer, M; Hill, J; Himmel, A; Hirota, S; Horiuchi, S; Huang, K; Ichikawa, A K; Iijima, T; Ikeda, M; Imber, J; Inoue, K; Insler, J; Intonti, R A; Irvine, T; Ishida, T; Ishino, H; Ishitsuka, M; Itow, Y; Izmaylov, A; Jamieson, B; Jang, H I; Jiang, M; Joo, K K; Jung, C K; Kaboth, A; Kajita, T; Kameda, J; Karadhzov, Y; Katori, T; Kearns, E; Khabibullin, M; Khotjantsev, A; Kim, J Y; Kim, S B; Kishimoto, Y; Kobayashi, T; Koga, M; Konaka, A; Kormos, L L; Korzenev, A; Koshio, Y; Kropp, W R; Kudenko, Y; Kutter, T; Kuze, M; Labarga, L; Lagoda, J; Laveder, M; Lawe, M; Learned, J G; Lim, I T; Lindner, T; Longhin, A; Ludovici, L; Ma, W; Magaletti, L; Mahn, K; Malek, M; Mariani, C; Marti, L; Martin, J F; Martin, C; Martins, P P J; Mazzucato, E; McCauley, N; McFarland, K S; McGrew, C; Mezzetto, M; Minakata, H; Minamino, A; Mine, S; Mineev, O; Miura, M; Monroe, J; Mori, T; Moriyama, S; Mueller, T; Muheim, F; Nakahata, M; Nakamura, K; Nakaya, T; Nakayama, S; Needham, M; Nicholls, T; Nirkko, M; Nishimura, Y; Noah, E; Nowak, J; Nunokawa, H; O'Keeffe, H M; Okajima, Y; Okumura, K; Oser, S M; O'Sullivan, E; Owen, R A; Oyama, Y; Perez, J; Pac, M Y; Palladino, V; Palomino, J L; Paolone, V; Payne, D; Perevozchikov, O; Perkin, J D; Pistillo, C; Playfer, S; Posiadala-Zezula, M; Poutissou, J -M; Quilain, B; Quinto, M; Radicioni, E; Ratoff, P N; Ravonel, M; Rayner, M; Redij, A; Retiere, F; Riccio, C; Richard, E; Rondio, E; Rose, H J; Ross-Lonergan, M; Rott, C; Rountree, S D; Rubbia, A; Sacco, R; Sakuda, M; Sanchez, M C; Scantamburlo, E; Scholberg, K; Scott, M; Seiya, Y; Sekiguchi, T; Sekiya, H; Shaikhiev, A; Shimizu, I; Shiozawa, M; Short, S; Sinnis, G; Smy, M B; Sobczyk, J; Sobel, H W; Stewart, T; Stone, J L; Suda, Y; Suzuki, Y; Suzuki, A T; Svoboda, R; Tacik, R; Takeda, A; Taketa, A; Takeuchi, Y; Tanaka, H A; Tanaka, H K M; Tanaka, H; Terri, R; Thompson, L F; Thorpe, M; Tobayama, S; Tolich, N; Tomura, T; Touramanis, C; Tsukamoto, T; Tzanov, M; Uchida, Y; Vagins, M R; Vasseur, G; Vogelaar, R B; Walter, C W; Wark, D; Wascko, M O; Weber, A; Wendell, R; Wilkes, R J; Wilking, M J; Wilson, J R; Xin, T; Yamamoto, K; Yanagisawa, C; Yano, T; Yen, S; Yershov, N; Yokoyama, M; Zito, M

    2014-01-01T23:59:59.000Z

    Hyper-Kamiokande will be a next generation underground water Cherenkov detector with a total (fiducial) mass of 0.99 (0.56) million metric tons, approximately 20 (25) times larger than that of Super-Kamiokande. One of the main goals of Hyper-Kamiokande is the study of $CP$ asymmetry in the lepton sector using accelerator neutrino and anti-neutrino beams. In this document, the physics potential of a long baseline neutrino experiment using the Hyper-Kamiokande detector and a neutrino beam from the J-PARC proton synchrotron is presented. The analysis has been updated from the previous Letter of Intent [K. Abe et al., arXiv:1109.3262 [hep-ex

  8. Concurrent 43 and 86 GHz Very Long Baseline Polarimetry of 3C273

    E-Print Network [OSTI]

    Joanne M. Attridge; John F. C. Wardle; Daniel C. Homan

    2005-06-10T23:59:59.000Z

    We present sub-milliarcsecond resolution total intensity and linear polarization VLBI images of 3C273, using concurrent 43 and 86 GHz data taken with the Very Long Baseline Array in May 2002. The structure seen in the innermost jet suggest that we have fortuitously caught the jet in the act of changing direction. The polarization images confirm that the core is unpolarized (fractional polarization m 5.2 x 10^{4} rad m^{-2} must be present in or in front of that region. These are among the highest rotation measures reported so far in the nucleus of any active galaxy or quasar, and must occur outside (but probably close to) the radio emitting region. The transverse rotation measure gradient is in the same sense as that observed by Asada et al and by Zavala and Taylor at greater core distances. The magnitude of the transverse gradient decreases rapidly with distance down the jet, and appears to be variable.

  9. Dual baseline search for muon antineutrino disappearance at 0.1 eV²

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Cheng, G.; Huelsnitz, W.; Aguilar-Arevalo, A. A.; Alcaraz-Aunion, J. L.; Brice, S. J.; Brown, B. C.; Bugel, L.; Catala-Perez, J.; Church, E. D.; Conrad, J. M.; et al

    2012-09-01T23:59:59.000Z

    The MiniBooNE and SciBooNE collaborations report the results of a joint search for short baseline disappearance of ?¯? at Fermilab’s Booster Neutrino Beamline. The MiniBooNE Cherenkov detector and the SciBooNE tracking detector observe antineutrinos from the same beam, therefore the combined analysis of their data sets serves to partially constrain some of the flux and cross section uncertainties. Uncertainties in the ?? background were constrained by neutrino flux and cross section measurements performed in both detectors. A likelihood ratio method was used to set a 90% confidence level upper limit on ?¯? disappearance that dramatically improves upon prior limits inmore »the ?m²=0.1–100 eV² region.« less

  10. A Long Baseline Neutrino Oscillation Experiment Using J-PARC Neutrino Beam and Hyper-Kamiokande

    E-Print Network [OSTI]

    Hyper-Kamiokande Working Group; :; K. Abe; H. Aihara; C. Andreopoulos; I. Anghel; A. Ariga; T. Ariga; R. Asfandiyarov; M. Askins; J. J. Back; P. Ballett; M. Barbi; G. J. Barker; G. Barr; F. Bay; P. Beltrame; V. Berardi; M. Bergevin; S. Berkman; T. Berry; S. Bhadra; F. d. M. Blaszczyk; A. Blondel; S. Bolognesi; S. B. Boyd; A. Bravar; C. Bronner; F. S. Cafagna; G. Carminati; S. L. Cartwright; M. G. Catanesi; K. Choi; J. H. Choi; G. Collazuol; G. Cowan; L. Cremonesi; G. Davies; G. De Rosa; C. Densham; J. Detwiler; D. Dewhurst; F. Di Lodovico; S. Di Luise; O. Drapier; S. Emery; A. Ereditato; P. Fernandez; T. Feusels; A. Finch; M. Fitton; M. Friend; Y. Fujii; Y. Fukuda; D. Fukuda; V. Galymov; K. Ganezer; M. Gonin; P. Gumplinger; D. R. Hadley; L. Haegel; A. Haesler; Y. Haga; B. Hartfiel; M. Hartz; Y. Hayato; M. Hierholzer; J. Hill; A. Himmel; S. Hirota; S. Horiuchi; K. Huang; A. K. Ichikawa; T. Iijima; M. Ikeda; J. Imber; K. Inoue; J. Insler; R. A. Intonti; T. Irvine; T. Ishida; H. Ishino; M. Ishitsuka; Y. Itow; A. Izmaylov; B. Jamieson; H. I. Jang; M. Jiang; K. K. Joo; C. K. Jung; A. Kaboth; T. Kajita; J. Kameda; Y. Karadhzov; T. Katori; E. Kearns; M. Khabibullin; A. Khotjantsev; J. Y. Kim; S. B. Kim; Y. Kishimoto; T. Kobayashi; M. Koga; A. Konaka; L. L. Kormos; A. Korzenev; Y. Koshio; W. R. Kropp; Y. Kudenko; T. Kutter; M. Kuze; L. Labarga; J. Lagoda; M. Laveder; M. Lawe; J. G. Learned; I. T. Lim; T. Lindner; A. Longhin; L. Ludovici; W. Ma; L. Magaletti; K. Mahn; M. Malek; C. Mariani; L. Marti; J. F. Martin; C. Martin; P. P. J. Martins; E. Mazzucato; N. McCauley; K. S. McFarland; C. McGrew; M. Mezzetto; H. Minakata; A. Minamino; S. Mine; O. Mineev; M. Miura; J. Monroe; T. Mori; S. Moriyama; T. Mueller; F. Muheim; M. Nakahata; K. Nakamura; T. Nakaya; S. Nakayama; M. Needham; T. Nicholls; M. Nirkko; Y. Nishimura; E. Noah; J. Nowak; H. Nunokawa; H. M. O'Keeffe; Y. Okajima; K. Okumura; S. M. Oser; E. O'Sullivan; R. A. Owen; Y. Oyama; J. Perez; M. Y. Pac; V. Palladino; J. L. Palomino; V. Paolone; D. Payne; O. Perevozchikov; J. D. Perkin; C. Pistillo; S. Playfer; M. Posiadala-Zezula; J. -M. Poutissou; B. Quilain; M. Quinto; E. Radicioni; P. N. Ratoff; M. Ravonel; M. Rayner; A. Redij; F. Retiere; C. Riccio; E. Richard; E. Rondio; H. J. Rose; M. Ross-Lonergan; C. Rott; S. D. Rountree; A. Rubbia; R. Sacco; M. Sakuda; M. C. Sanchez; E. Scantamburlo; K. Scholberg; M. Scott; Y. Seiya; T. Sekiguchi; H. Sekiya; A. Shaikhiev; I. Shimizu; M. Shiozawa; S. Short; G. Sinnis; M. B. Smy; J. Sobczyk; H. W. Sobel; T. Stewart; J. L. Stone; Y. Suda; Y. Suzuki; A. T. Suzuki; R. Svoboda; R. Tacik; A. Takeda; A. Taketa; Y. Takeuchi; H. A. Tanaka; H. K. M. Tanaka; H. Tanaka; R. Terri; L. F. Thompson; M. Thorpe; S. Tobayama; N. Tolich; T. Tomura; C. Touramanis; T. Tsukamoto; M. Tzanov; Y. Uchida; M. R. Vagins; G. Vasseur; R. B. Vogelaar; C. W. Walter; D. Wark; M. O. Wascko; A. Weber; R. Wendell; R. J. Wilkes; M. J. Wilking; J. R. Wilson; T. Xin; K. Yamamoto; C. Yanagisawa; T. Yano; S. Yen; N. Yershov; M. Yokoyama; M. Zito

    2015-01-18T23:59:59.000Z

    Hyper-Kamiokande will be a next generation underground water Cherenkov detector with a total (fiducial) mass of 0.99 (0.56) million metric tons, approximately 20 (25) times larger than that of Super-Kamiokande. One of the main goals of Hyper-Kamiokande is the study of $CP$ asymmetry in the lepton sector using accelerator neutrino and anti-neutrino beams. In this document, the physics potential of a long baseline neutrino experiment using the Hyper-Kamiokande detector and a neutrino beam from the J-PARC proton synchrotron is presented. The analysis has been updated from the previous Letter of Intent [K. Abe et al., arXiv:1109.3262 [hep-ex

  11. Baseline LHC machine parameters and configuration of the 2015 proton run

    E-Print Network [OSTI]

    R. Bruce; G. Arduini; S. Fartoukh; M. Giovannozzi; M. Lamont; E. Metral; T. Pieloni; S. Redaelli; J. Wenninger

    2014-10-22T23:59:59.000Z

    This paper shows the baseline LHC machine parameters for the 2015 start-up. Many systems have been upgraded during LS1 and in 2015 the LHC will operate at a higher energy than before and with a tighter filling scheme. Therefore, the 2015 commissioning phase risks to be less smooth than in 2012. The proposed starting configuration puts the focus on feasibility rather than peak performance and includes margins for operational uncertainties. Instead, once beam experience and a better machine knowledge has been obtained, a push in $\\beta^*$ and performance can be envisaged. In this paper, the focus is on collimation settings and reach in $\\beta^*$---other parameters are covered in greater depth by other papers in these proceedings.

  12. Etalon-induced Baseline Drift And Correction In Atom Flux Sensors Based On Atomic Absorption Spectroscopy

    SciTech Connect (OSTI)

    Du, Yingge; Chambers, Scott A.

    2014-10-20T23:59:59.000Z

    Atom flux sensors based on atomic absorption (AA) spectroscopy are of significant interest in thin film growth as they can provide unobtrusive, element specific, real-time flux sensing and control. The ultimate sensitivity and performance of the sensors are strongly affected by the long-term and short term baseline drift. Here we demonstrate that an etalon effect resulting from temperature changes in optical viewport housings is a major source of signal instability which has not been previously considered or corrected by existing methods. We show that small temperature variations in the fused silica viewports can introduce intensity modulations of up to 1.5%, which in turn significantly deteriorate AA sensor performance. This undesirable effect can be at least partially eliminated by reducing the size of the beam and tilting the incident light beam off the viewport normal.

  13. CleanFleet. Volume 2, Project Design and Implementation

    SciTech Connect (OSTI)

    NONE

    1995-12-01T23:59:59.000Z

    The CleanFleet alternative fuels demonstration project evaluated five alternative motorfuels in commercial fleet service over a two-year period. The five fuels were compressed natural gas, propane gas, California Phase 2 reformulated gasoline (RFG), M-85 (85 percent methanol and 15 percent RFG), and electric vans. Eight-four vans were operated on the alternative fuels and 27 vans were operated on gasoline as baseline controls. Throughout the demonstration information was collected on fleet operations, vehicle emissions, and fleet economics. In this volume of the CleanFleet findings, the design and implementation of the project are summarized.

  14. Project X: A Multi-MW Proton Source at Fermilab

    SciTech Connect (OSTI)

    Holmes, Stephen D.; /Fermilab

    2010-05-01T23:59:59.000Z

    As the Fermilab Tevatron Collider program draws to a close a strategy has emerged of an experimental program built around the high intensity frontier. The centerpiece of this program is a superconducting H- linac that will support world leading programs in long baseline neutrino experimentation and he study of rare processes. Based on technology shared with the International Linear Collider (ILC), Project X will provide multi-MW beams at 60-120 GeV from the Main Injector, simultaneous with very high intensity beams at lower energies. Project X will also support development of a Muon Collider as a uture facility at the energy frontier.

  15. Baseline for Climate Change: Modeling Watershed Aquatic Biodiversity Relative to Environmental and Anthropogenic Factors

    SciTech Connect (OSTI)

    Maurakis, Eugene G

    2010-10-01T23:59:59.000Z

    Objectives of the two-year study were to (1) establish baselines for fish and macroinvertebrate community structures in two mid-Atlantic lower Piedmont watersheds (Quantico Creek, a pristine forest watershed; and Cameron Run, an urban watershed, Virginia) that can be used to monitor changes relative to the impacts related to climate change in the future; (2) create mathematical expressions to model fish species richness and diversity, and macroinvertebrate taxa and macroinvertebrate functional feeding group taxa richness and diversity that can serve as a baseline for future comparisons in these and other watersheds in the mid-Atlantic region; and (3) heighten people’s awareness, knowledge and understanding of climate change and impacts on watersheds in a laboratory experience and interactive exhibits, through internship opportunities for undergraduate and graduate students, a week-long teacher workshop, and a website about climate change and watersheds. Mathematical expressions modeled fish and macroinvertebrate richness and diversity accurately well during most of the six thermal seasons where sample sizes were robust. Additionally, hydrologic models provide the basis for estimating flows under varying meteorological conditions and landscape changes. Continuations of long-term studies are requisite for accurately teasing local human influences (e.g. urbanization and watershed alteration) from global anthropogenic impacts (e.g. climate change) on watersheds. Effective and skillful translations (e.g. annual potential exposure of 750,000 people to our inquiry-based laboratory activities and interactive exhibits in Virginia) of results of scientific investigations are valuable ways of communicating information to the general public to enhance their understanding of climate change and its effects in watersheds.

  16. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

  17. High-power baseline and motoring test results for the GPU-3 Stirling engine

    SciTech Connect (OSTI)

    Thieme, L.G.

    1981-06-01T23:59:59.000Z

    In support of the Department of Energy's Stirling Engine Highway Vehicle Systems program, the NASA Lewis Research Center has installed a 7.5-kilowatt (10-hp) GPU-3 Stirling engine with a motoring dynamometer to continue to obtain data for validating Stirling-cycle computer simulations and to prepare for future component testing. The engine was originally built by General Motors Research Laboratories for the US Army in 1965 as part of a 3-kilowatt engine-generator set. Baseline tests were run to map the engine over a range of mean compression-space pressures of 2.8 to 6.9 megapascals (400 to 1000 psi) and engine speeds of 1500 to 3500 rpm with both helium and hydrogen as the working fluid. All tests were run at a heater-tube gas temperature of 677/sup 0/C (1250/sup 0/F). Maximum power obtained with hydrogen was 6.82 kilowatts (9.14 hp) at 6.9 megapascals (1000 psi) and 3500 rpm. The maximum power with helium was 4.26 kilowatts (5.71 hp) at 6.9 megapascals (1000 psi) and 2500 rpm. The highest brake thermal efficiencies obtained were 26.4 percent for hydrogen and 21.3 percent for helium. These both occurred at 6.9-megapascal (1000-psi) mean compression-space pressure and 1500-rpm engine speed. The engine output was low at high speeds as compared with that for the previously reported low-power baseline tests that used the alternator and resistance load bank instead of the dynamometer. It is felt that this reduced power was caused by degradation of heat exchanger effectiveness as a result of contamination by rust and oil. However, efficiency was higher than in the previous tests because of the installation of a noncontaminated preheater that reduced combustion system losses.

  18. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing the extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.

  19. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect (OSTI)

    Slaybaugh, R.R.

    1997-08-29T23:59:59.000Z

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  20. MIT Integrated Global System Model (IGSM) Version 2: Model Description and Baseline Evaluation

    E-Print Network [OSTI]

    Sokolov, Andrei P.

    The MIT Integrated Global System Model (IGSM) is designed for analyzing the global environmental changes that may result from anthropogenic causes, quantifying the uncertainties associated with the projected changes, and ...

  1. Conceptual design report for tank farm restoration and safe operations, project W-314

    SciTech Connect (OSTI)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02T23:59:59.000Z

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  2. The 1993 baseline biological studies and proposed monitoring plan for the Device Assembly Facility at the Nevada Test Site

    SciTech Connect (OSTI)

    Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

    1995-02-01T23:59:59.000Z

    This report contains baseline data and recommendations for future monitoring of plants and animals near the new Device Assembly Facility (DAF) on the Nevada Test Site (NTS). The facility is a large structure designed for safely assembling nuclear weapons. Baseline data was collected in 1993, prior to the scheduled beginning of DAF operations in early 1995. Studies were not performed prior to construction and part of the task of monitoring operational effects will be to distinguish those effects from the extensive disturbance effects resulting from construction. Baseline information on species abundances and distributions was collected on ephemeral and perennial plants, mammals, reptiles, and birds in the desert ecosystems within three kilometers (km) of the DAF. Particular attention was paid to effects of selected disturbances, such as the paved road, sewage pond, and the flood-control dike, associated with the facility. Radiological monitoring of areas surrounding the DAF is not included in this report.

  3. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Maybell, Colorado

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, building foundations, and materials associated with the former processing of uranium ore at UMTRA sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further contamination of ground water. One UMTRA Project site is near Maybell, Colorado. Surface cleanup at this site is under way and is scheduled for completion in 1996. The tailings are being stabilized in-place at this site. The disposal area has been withdrawn from public use by the DOE and is referred to as the permanent withdrawal area. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from past uranium ore processing activities. The Ground Water Project at this site is in its beginning stages. This report is a site-specific document that will be used to evaluate current and future potential impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the environment. Currently, no points of exposure (e.g. a drinking water well); and no receptors of contaminated ground water have been identified at the Maybell site. Therefore, there are no current human health and ecological risks associated with exposure to contaminated ground water. Furthermore, if current site conditions and land- and water-use patterns do not change, it is unlikely that contaminated ground water would reach people or the ecological communities in the future.

  4. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  5. Innovative Clean Coal Technology (ICCT): 180 MW demonstration of advanced tangentially-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Phase 1, Baseline tests

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    The primary objective of the project is to investigate the long-term effects of commercially available tangentially-fired low NO{sub x} combustion technologies on NOx emissions and boiler performance on Unit 2 at Gulf Power Company`s Plant Lansing Smith located near Lynn Haven, Florida. The project will characterize emissions and performance of a tangentially-fired boiler operating in the following configurations: Baseline ``as-found`` configuration: Phase 1; retrofitted low NO{sub x} concentric firing system (LNCFS) Level 2 and simulated low NO{sub x} bulk furnace staging (LNBFS): Phase 2; retrofitted low NO{sub x} concentric firing system (LNCFS) Level 3, Phase 3a and simulated LNCFS Level 1, Phase 3b.

  6. On the possibility of sourcing a mono-energetic $\\bar?_{e}$ long baseline beta beam from bound beta decay

    E-Print Network [OSTI]

    Christopher Orme

    2009-11-24T23:59:59.000Z

    In this paper, the possibility of using fully stripped ions that can decay through bound beta decay to complement electron capture long baseline neutrino oscillation experiments is qualitatively analysed. The disadvantages of such a source are discussed through consideration of the technological challenges faced and the energy resolution required from the detector. It is concluded that ions that bound beta decay cannot be used as a source of mono-energetic anti-neutrinos in a realistic long baseline CP-even neutrino beam.

  7. Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001

    E-Print Network [OSTI]

    Hydroelectric Power Project impacts Improve natural salmonid habitat and production #12;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from livestockRest from livestock;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from

  8. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect (OSTI)

    MCGRATH, G.M.

    2000-06-21T23:59:59.000Z

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  9. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect (OSTI)

    HOLSTEIN, W.A.

    1999-08-01T23:59:59.000Z

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  10. West Foster Creek Expansion Project 2007 HEP Report.

    SciTech Connect (OSTI)

    Ashley, Paul R.

    2008-02-01T23:59:59.000Z

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  11. Forest Restoration Carbon Analysis of Baseline Carbon Emissions and Removal in Tropical Rainforest at La Selva Central, Peru

    SciTech Connect (OSTI)

    Patrick Gonzalez; Benjamin Kroll; Carlos R. Vargas

    2006-01-10T23:59:59.000Z

    Conversion of tropical forest to agricultural land and pasture has reduced forest extent and the provision of ecosystem services, including watershed protection, biodiversity conservation, and carbon sequestration. Forest conservation and reforestation can restore those ecosystem services. We have assessed forest species patterns, quantified deforestation and reforestation rates, and projected future baseline carbon emissions and removal in Amazon tropical rainforest at La Selva Central, Peru. The research area is a 4800 km{sup 2} buffer zone around the Parque Nacional Yanachaga-Chemillen, Bosque de Proteccion San Matias-San Carlos, and the Reserva Comunal Yanesha. A planned project for the period 2006-2035 would conserve 4000 ha of forest in a proposed 7000 ha Area de Conservacion Municipale de Chontabamba and establish 5600 ha of natural regeneration and 1400 ha of native species plantations, laid out in fajas de enriquecimiento (contour plantings), to reforest 7000 ha of agricultural land. Forest inventories of seven sites covering 22.6 ha in primary forest and 17 sites covering 16.5 ha in secondary forest measured 17,073 trees of diameter {ge} 10 cm. The 24 sites host trees of 512 species, 267 genera, and 69 families. We could not identify the family of 7% of the trees or the scientific species of 21% of the trees. Species richness is 346 in primary forest and 257 in the secondary forest. In primary forest, 90% of aboveground biomass resides in old-growth species. Conversely, in secondary forest, 66% of aboveground biomass rests in successional species. The density of trees of diameter {ge} 10 cm is 366 trees ha{sup -1} in primary forest and 533 trees ha{sup -1} in secondary forest, although the average diameter is 24 {+-} 15 cm in primary forest and 17 {+-} 8 cm in secondary forest. Using Amazon forest biomass equations and wood densities for 117 species, aboveground biomass is 240 {+-} 30 t ha{sup -1} in the primary sites and 90 {+-} 10 t ha{sup -1} in the secondary sites. Aboveground carbon density is 120 {+-} 15 t ha{sup -1} in primary forest and 40 {+-} 5 t ha{sup -1} in secondary forest. Forest stands in the secondary forest sites range in age from 10 to 42 y. Growth in biomass (t ha{sup -1}) as a function of time (y) follows the relation: biomass = 4.09-0.017 age{sup 2} (p < 0.001). Aboveground biomass and forest species richness are positively correlated (r{sup 2} = 0.59, p < 0.001). Analyses of Landsat data show that the land cover of the 3700 km{sup 2} of non-cloud areas in 1999 was: closed forest 78%; open forest 12%, low vegetation cover 4%, sparse vegetation cover 6%. Deforestation from 1987 to 1999 claimed a net 200 km{sup 2} of forest, proceeding at a rate of 0.005 y{sup -1}. Of those areas of closed forest in 1987, only 89% remained closed forest in 1999. Consequently, closed forests experienced disruption in the time period at double the rate of net deforestation. The three protected areas experienced negligible deforestation or slight reforestation. Based on 1987 forest cover, 26,000 ha are eligible for forest carbon trading under the Clean Development Mechanism, established by the Kyoto Protocol to the United Nations Framework Convention on Climate Change. Principal components analysis showed that distance to nonforest was the factor that best explained observed patterns of deforestation while distance to forest best explained observed patterns of reforestation, more significant than elevation, distance to rivers, distance to roads, slope, and distance to towns of population > 400. Aboveground carbon in live vegetation in the project area decreased from 35 million {+-} 4 million t in 1987 to 34 million {+-} 4 million t in 1999. Projected aboveground carbon in live vegetation would fall to 33 million {+-} 4 million t in 2006, 32 million {+-} 4 million t in 2011, and 29 million {+-} 3 million t in 2035. Projected net deforestation in the research area would total 13,000 {+-} 3000 ha in the period 1999-2011, proceeding at a rate of 0.003 {+-} 0.0007 y{sup -1}, and would total 33,000 {+-} 7000

  12. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site.

  13. Project Name Project Number Tagging Type

    E-Print Network [OSTI]

    Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

  14. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    SciTech Connect (OSTI)

    D. H. BULTMAN; D. WEINACHT - AIRES CORP.

    2000-08-01T23:59:59.000Z

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule).

  15. NREL Solar Radiation Research Laboratory (SRRL): Baseline Measurement System (BMS); Golden, Colorado (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    The SRRL was established at the Solar Energy Research Institute (now NREL) in 1981 to provide continuous measurements of the solar resources, outdoor calibrations of pyranometers and pyrheliometers, and to characterize commercially available instrumentation. The SRRL is an outdoor laboratory located on South Table Mountain, a mesa providing excellent solar access throughout the year, overlooking Denver. Beginning with the basic measurements of global horizontal irradiance, direct normal irradiance and diffuse horizontal irradiance at 5-minute intervals, the SRRL Baseline Measurement System now produces more than 130 data elements at 1-min intervals that are available from the Measurement & Instrumentation Data Center Web site. Data sources include global horizontal, direct normal, diffuse horizontal (from shadowband and tracking disk), global on tilted surfaces, reflected solar irradiance, ultraviolet, infrared (upwelling and downwelling), photometric and spectral radiometers, sky imagery, and surface meteorological conditions (temperature, relative humidity, barometric pressure, precipitation, snow cover, wind speed and direction at multiple levels). Data quality control and assessment include daily instrument maintenance (M-F) with automated data quality control based on real-time examinations of redundant instrumentation and internal consistency checks using NREL's SERI-QC methodology. Operators are notified of equipment problems by automatic e-mail messages generated by the data acquisition and processing system. Radiometers are recalibrated at least annually with reference instruments traceable to the World Radiometric Reference (WRR).

  16. Comprehensive Baseline Environmental Audit of the Inhalation Toxicology Research Institute, Albuquerque, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    This report documents the results of the Comprehensive Baseline Environmental Audit conducted at the Inhalation Toxicology Research Institute (ITRI) in Albuquerque, New Mexico. The scope of the audit at the ITRI was comprehensive, addressing environmental activities in the technical areas of air; soils, sediments, and biota; surface water/drinking water; groundwater; waste management; toxic and chemical materials; quality assurance; radiation; inactive waste sites; environmental management; and environmental monitoring programs. Specifically assessed was the compliance of ITRI operations and activities with Federal, state, and local regulations; DOE Orders; internal operating standards; and best management practices. Onsite activities included inspection of ITRI facilities and operations; review of site documents; interviews with DOE and contractor personnel, as well as representatives from state regulatory agencies; and reviews of previous appraisals. Using these sources of information, the environmental audit team developed findings, which fell into two general categories: compliance findings and best management practice findings. Each finding also identifies apparent causal factor(s) that contributed to the finding and will assist line management in developing ``root causes`` for implementing corrective actions.

  17. Optimization of neutrino fluxes for future long baseline neutrino oscillation experiments

    E-Print Network [OSTI]

    Calviani, M; Galymov, V; Velten, P

    2014-01-01T23:59:59.000Z

    One of the main goals of the Long Baseline Neutrino Oscillation experiment (LBNO) experiment is to study the L/E behaviour of the electron neutrino appearance probability in order to determine the unknown phase $\\delta_{CP}$. In the standard neutrino 3-flavour mixing paradigm, this parameter encapsulates a possibility of a CP violation in the lepton sector that in turn could help explain the matter-antimatter asymmetry in the universe. In LBNO, the measurement of $\\delta_{CP}$ would rely on the observation of the electron appearance probability in a broad energy range covering the 1$^{st}$ and 2$^{nd}$ maxima of the oscillation probability. An optimization of the energy spectrum of the neutrino beam is necessary to find the best coverage of the neutrino energies of interest. This in general is a complex task that requires exploring a large parameter space describing hadron target and beamline focusing elements. In this paper we will present a numerical approach of finding a solution to this difficult optimiza...

  18. Cost-effective way to enhance the capabilities of the LCLS baseline

    E-Print Network [OSTI]

    Geloni, Gianluca; Saldin, Evgeni

    2010-01-01T23:59:59.000Z

    This paper discusses the potential for enhancing the LCLS hard X-ray FEL capabilities. In the hard X-ray regime, a high longitudinal coherence will be the key to such performance upgrade. The method considered here to obtain high longitudinal coherence is based on a novel single-bunch self-seeding scheme exploiting a single crystal monochromator, which is extremely compact and can be straightforwardly installed in the LCLS baseline undulator. We present simulation results dealing with the LCLS hard X-ray FEL, and show that this method can produce fully-coherent X-ray pulses at 100 GW power level. With the radiation beam monochromatized down to the Fourier transform limit, a variety of very different techniques leading to further improvements of the LCLS performance become feasible. In particular, we describe an efficient way for obtaining full polarization control at the LCLS hard X-ray FEL. We also propose to exploit crystals in the Bragg reflection geometry as movable deflectors for the LCLS X-ray transport...

  19. Baseline avian use and behavior at the CARES wind plant site, Klickitat County, Washington

    SciTech Connect (OSTI)

    Erickson, W.P.; Johnson, G.D.; Strickland, M.D.; Kronner, K.; Becker, P.S.; Orloff, S.

    2000-01-03T23:59:59.000Z

    This report presents a literature review on avian-wind turbine interactions and the results of a one-year avian baseline study conducted in 1998 at the proposed Conservation and Renewable Energy System (CARES) wind development site in Klickitat County, Washington. Avian use of the site ranged from 1.11/survey in the winter to 5.69/survey in the spring. Average use by passerines in the study plots ranged from 1.15 minutes/survey in the winter to 40.98 minutes/survey in the spring. Raptors spent much less time within plots than other groups, ranging from 0.05 minutes/survey in the winter to 0.77 minutes/survey during the fall. Thirteen percent of all flying birds were within the rotor-swept height (25 to 75 m); 41.6% of all raptors were flying at this height. Raptors with the greatest potential turbine exposure are red-tailed hawks and golden eagles. Passerines with the highest turbine exposure are common ravens, American robins, and horned larks. Spatial use data for the site indicate that avian use tends to be concentrated near the rim, indicating that placing turbines away from the rim may reduce risk. Avian use data at the CARES site indicate that if a wind plant is constructed in the future, avian mortality would likely be relatively low.

  20. Integrated Baseline System (IBS), Version 1.03. User guide: Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Bailey, B.M.; Burford, M.J.; Downing, T.R.; Matsumoto, S.W.; Schrank, E.E.; Williams, J.R.; Winters, C.

    1993-01-01T23:59:59.000Z

    The Integrated Baseline System (IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planing and analysis. This document is the user guide for the IBS and explains how to operate the IBS system. The fundamental function of the IBS is to provide tools that civilian emergency management personnel can use in developing emergency plans and in supporting emergency management activities to cope with a chemical-releasing event at a military chemical stockpile. Emergency management planners can evaluate concepts and ideas using the IBS system. The results of that experience can then be factored into refining requirements and plans. This document provides information for the general system user, and is the primary reference for the system features of the IBS. It is designed for persons who are familiar with general emergency management concepts, operations, and vocabulary. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other LBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary. IBS is a dynamic system. Its capabilities are in a state of continuing expansion and enhancement.

  1. Integrated Baseline System (IBS), Version 1. 03. [Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Bailey, B.M.; Burford, M.J.; Downing, T.R.; Matsumoto, S.W.; Schrank, E.E.; Williams, J.R.; Winters, C.

    1993-01-01T23:59:59.000Z

    The Integrated Baseline System (IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planing and analysis. This document is the user guide for the IBS and explains how to operate the IBS system. The fundamental function of the IBS is to provide tools that civilian emergency management personnel can use in developing emergency plans and in supporting emergency management activities to cope with a chemical-releasing event at a military chemical stockpile. Emergency management planners can evaluate concepts and ideas using the IBS system. The results of that experience can then be factored into refining requirements and plans. This document provides information for the general system user, and is the primary reference for the system features of the IBS. It is designed for persons who are familiar with general emergency management concepts, operations, and vocabulary. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other LBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary. IBS is a dynamic system. Its capabilities are in a state of continuing expansion and enhancement.

  2. Determination of the relativistic parameter gamma using very long baseline interferometry

    E-Print Network [OSTI]

    S. B. Lambert; C. Le Poncin-Lafitte

    2009-03-09T23:59:59.000Z

    Relativistic bending in the vicinity of a massive body is characterized only by the post-Newtonian parameter $\\gamma$ within the standard parameterized post-Newtonian formalism, which is unity in General Relativity. Aiming at estimating this parameter, we use very long baseline interferometry (VLBI) to measure the gravitational deflection of radio waves emitted by distant compact radio sources, by Solar System bodies. We analyze geodetic VLBI observations recorded since 1979. We compare estimates of $\\gamma$ and errors obtained using various analysis schemes including global estimations over several time spans and with various Sun elongation cut-off angles, and analysis of radio source coordinate time series. We arrive at the conclusion that the relativistic parameter $\\gamma$ cannot be estimated at better than $2\\times10^{-4}$. The main factor of limitation is the uncertainty in the determination of (global or session-wise) radio source coordinates. A sum of various instrumental and modeling errors and analysis strategy defects, that cannot be decorrelated and corrected yet, is at the origin of the limitating noise.

  3. Lawrence Livermore National Laboratory Emergency Response Capability 2009 Baseline Needs Assessment Performance Assessment

    SciTech Connect (OSTI)

    Sharry, J A

    2009-12-30T23:59:59.000Z

    This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by Sandia/CA Fire Marshal, Martin Gresho. This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2009 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2004 BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. On October 1, 2007, LLNL contracted with the Alameda County Fire Department to provide emergency response services. The level of service called for in that contract is the same level of service as was provided by the LLNL Fire Department prior to that date. This Compliance Assessment will evaluate fire department services beginning October 1, 2008 as provided by the Alameda County Fire Department.

  4. Cape Canaveral Air Force Station integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Wahlstrom, R.R.; McMordie, K.L.; Parker, S.A.; King, D.A.; Sandusky, W.F.

    1993-12-01T23:59:59.000Z

    The US Air Force (USAF) has tasked the Pacific Northwest Laboratory (PNL), in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to assess energy use at Cape Canaveral Air Force Station (AFS). The information obtained from this assessment will be used in identifying energy resource opportunities to reduce overall energy consumption by the station. The primary focus of this report is to assess the current baseline energy consumption at Cape Canaveral AFS. It is A companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This assessment requires that information be obtained and characterized for buildings, utilities, energy sources, energy uses, and load profiles to be used to improve the current energy system on the station. The characteristics of electricity, diesel fuel, No. 2 fuel oil, and motor vehicle gasoline (MOGAS) are analyzed for on-base facilities. The assessment examines basic regional information used to determine energy-use intensity (EUI) values for Cape Canaveral AFS facilities by building, fuel type, and energy end use. It also provides a summary of electricity consumption from Florida Power and Light Company (FPL) metered data for 1985--1991. Load profile information obtained from FPL data is presented for the North, South, and Titan Substations for the four seasons of the year, including weekdays and weekends.

  5. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States); Bailey, S. [Innovative Emergency Management, Inc., Baton Rouge, LA (United States); Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)

    1993-01-01T23:59:59.000Z

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

  6. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    SciTech Connect (OSTI)

    MCLELLAN, G.W.

    2007-02-07T23:59:59.000Z

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL, ORP, the Washington State Department of Ecology, and independent certified quality assurance an

  7. Projects | Department of Energy

    Office of Environmental Management (EM)

    Projects Projects All 1703 1705 ATVM Current Portfolio 32.4 B in Loans 55 K Jobs Current Portfolio Loans 32.4 B Jobs 55,000 Loan Program Office Projects 1703 1705 ATVM...

  8. CRSP Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    expenses of the project each year, and receive all of the energy it produces. Salt Lake City AreaIntegrated Projects: Power from the Colorado River Storage Project plants was...

  9. Project Selection - Record Keeping

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

  10. Super Projects (Arkansas)

    Broader source: Energy.gov [DOE]

    A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

  11. Development Of An Agroforestry Sequestration Project In KhammamDistrict Of India

    SciTech Connect (OSTI)

    Sudha, P.; Ramprasad, V.; Nagendra, M.D.V.; Kulkarni, H.D.; Ravindranath, N.H.

    2007-06-01T23:59:59.000Z

    Large potential for agroforestry as a mitigation option hasgiven rise to scientific and policy questions. This paper addressesmethodological issues in estimating carbon sequestration potential,baseline determination, additionality and leakage in Khammam district,Andhra Pradesh, southern part of India. Technical potential forafforestation was determined considering the various landuse options. Forestimating the technical potential, culturable wastelands, fallow andmarginal croplands were considered for Eucalyptus clonal plantations.Field studies for aboveground and below ground biomass, woody litter andsoil organic carbon for baseline and project scenario were conducted toestimate the carbon sequestration potential. The baseline carbon stockwas estimated to be 45.33 tC/ha. The additional carbon sequestrationpotential under the project scenario for 30 years is estimated to be12.82 tC/ha/year inclusive of harvest regimes and carbon emissions due tobiomass burning and fertilizer application. The project scenario thoughhas a higher benefit cost ratio compared to baseline scenario, initialinvestment cost is high. Investment barrier exists for adoptingagroforestry in thedistrict.

  12. Colado Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CER esDatasetCityFundCo-benefitsCoalogixfield |

  13. Shifting base-lines, declining coral cover, and the erosion of reef resilience: comment on Sweatman et al. (2011)

    E-Print Network [OSTI]

    Bruno, John F.

    complacency or denial. Keywords Shifting base-lines Á Climate change Á Monitoring Á Coral cover In recent- mental degradation from overfishing, pollution, and cli- mate change, calls for action rather than changes on land following the arrival of Europeans and their livestock, and from land clearing

  14. Nuclear Instruments and Methods in Physics Research A 503 (2003) 187191 Geophysical aspects of very long baseline neutrino experiments

    E-Print Network [OSTI]

    Geller, Robert

    2003-01-01T23:59:59.000Z

    Nuclear Instruments and Methods in Physics Research A 503 (2003) 187­191 Geophysical aspects of very long baseline neutrino experiments Robert J. Gellera, *, Tatsuhiko Harab a Department of Earth, Tatehara 1, Tsukuba 305-0802, Japan Abstract Several proposed experiments will send beams of neutrinos

  15. Climate policies : what if emerging country baseline were not so optimistic? a case study related to India

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    -mail address: mathy@centre-cired.fr (S. Mathy) Keywords India, domestic policies and measures, climate policies1 of 14 Climate policies : what if emerging country baseline were not so optimistic? ­ a case study related to India Sandrine Mathya,* , Céline Guivarcha a Centre International de Recherche sur l

  16. Part-per-million gas detection from long-baseline THz spectroscopy S. A. Harmon and R. A. Chevillea)

    E-Print Network [OSTI]

    Part-per-million gas detection from long-baseline THz spectroscopy S. A. Harmon and R. A. Chevillea on a White cell design capable of detecting gas species in the low part-per-million range in near real time length at pressures down to 1 Pa. Both phase sensitive (lock-in) detection and direct signal averaging

  17. Energy Strategic Planning & Sufficiency Project

    SciTech Connect (OSTI)

    Retziaff, Greg

    2005-03-30T23:59:59.000Z

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  18. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  19. Project BETA Cover Page

    E-Print Network [OSTI]

    Cover Page, Project BETA

    2012-01-01T23:59:59.000Z

    and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

  20. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  1. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  2. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  3. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  4. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  5. Long-Baseline Neutrino Experiment (LBNE) Water Cherenkov Detector Schedule and Cost Books LBNE Far Site Internal Review(December 6-9,2011)

    SciTech Connect (OSTI)

    Stewart J.; Diwan, M.; Dolph, J.; Novakova, P.; Sharma, R.; Stewart, J.; Viren, B.; Russo, T.; Kaducak, M.; Mantsch, P.; Paulos, B.; Feyzi, F.; Sullivan, G.; Bionta, R.; Fowler, J.; Warner, D.; Bahowick, S.; Van Berg, R.; Kearns, E.; Hazen, E.; Sinnis, G.; Sanchez, M.

    2011-12-09T23:59:59.000Z

    Schedule and Cost Books developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  6. Long-Baseline Neutrino Experiment (LBNE)Water Cherenkov Detector Basis of Estimate Forms and Backup Documentation LBNE Far Site Internal Review (December 6-9, 2011)

    SciTech Connect (OSTI)

    Stewart J.; Diwan, M.; Dolph, J.; Novakova, P.; Sharma, R.; Stewart, J.; Viren, B.; Russo, T.; Kaducak, M.; Mantsch, P.; Paulos, B.; Feyzi, F.; Sullivan, G.; Bionta, R.; Fowler, J.; Warner, D.; Bahowick, S.; Van Berg, R.; Kearns, E.; Hazen, E.; Sinnis, G.; Sanchez, M.

    2011-12-09T23:59:59.000Z

    Basis of Estimate (BOE) forms and backup documentation developed for the Water Cherenkov Detector (WCD) option for the far detector of the Long Baseline Neutrino Experiment (LBNE)

  7. Sampling designs for geochemical baseline studies in the Colorado oil shale region: a manual for practical application

    SciTech Connect (OSTI)

    Klusman, R. W.; Ringrose, C. D.; Candito, R. J.; Zuccaro, B.; Rutherford, D. W.; Dean, W. E.

    1980-06-01T23:59:59.000Z

    This manual presents a rationale for sampling designs, and results of geochemical baseline studies in the Colorado portion of the oil-shale region. The program consists of a systematic trace element study of soils, stream sediments, and plants carried out in a way to be conservative of human and financial resources and yield maximum information. Extension of this approach to other parameters, other locations, and to environmental baseline studies in general is a primary objective. A baseline for any geochemical parameter can be defined as the concentration of that parameter in a given medium such as soil, the range of its concentration, and the geographic scale of variability. In air quality studies, and to a lesser extent for plants, the temporal scale of variability must also be considered. In studies of soil, the temporal variablility does not become a factor until such time that a study is deemed necessary to evaluate whether or not there have been changes in baseline levels as a result of development. The manual is divided into five major parts. The first is a suggested sampling protocol which is presented in an outline form for guiding baseline studies in this area. The second section is background information on the physical features of the area of study, trace elements of significance occurring in oil shale, and the sample media used in these studies. The third section is concerned primarily with sampling design and its application to the geochemical studies of the oil shale region. The last sections, in the form of appendices, provide actual data and illustrate in a systematic manner, the calculations performed to obtain the various summary data. The last segment of the appendices is a more academic discussion of the geochemistry of trace elements and the parameters of importance influencing their behavior in natural systems.

  8. Office of River Protection: Simplifying Project management tools

    SciTech Connect (OSTI)

    TAYLOR, D.G.

    2000-09-24T23:59:59.000Z

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions.

  9. Integrated monitoring and surveillance system demonstration project

    SciTech Connect (OSTI)

    Aumeier, S.E.; Walters, G. [Argonne National Lab., Idaho Falls, ID (United States); Kotter, D.; Walrath, W.M.; Zamecnik, R.J. [Lockheed-Martin Idaho Technologies Company, Idaho Falls, ID (United States)

    1997-07-01T23:59:59.000Z

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  10. Manhattan Project | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan Project Manhattan Project Manhattan Project New Manhattan Project Interactive Website The Department of Energy traces its origins to World War II and the Manhattan...

  11. Systematic uncertainties in long-baseline neutrino oscillations for large $?_{13}$

    E-Print Network [OSTI]

    Pilar Coloma; Patrick Huber; Joachim Kopp; Walter Winter

    2012-09-26T23:59:59.000Z

    We study the physics potential of future long-baseline neutrino oscillation experiments at large $\\theta_{13}$, focusing especially on systematic uncertainties. We discuss superbeams, \\bbeams, and neutrino factories, and for the first time compare these experiments on an equal footing with respect to systematic errors. We explicitly simulate near detectors for all experiments, we use the same implementation of systematic uncertainties for all experiments, and we fully correlate the uncertainties among detectors, oscillation channels, and beam polarizations as appropriate. As our primary performance indicator, we use the achievable precision in the measurement of the CP violating phase $\\deltacp$. We find that a neutrino factory is the only instrument that can measure $\\deltacp$ with a precision similar to that of its quark sector counterpart. All neutrino beams operating at peak energies $\\gtrsim 2$ GeV are quite robust with respect to systematic uncertainties, whereas especially \\bbeams and \\thk suffer from large cross section uncertainties in the quasi-elastic regime, combined with their inability to measure the appearance signal cross sections at the near detector. A noteworthy exception is the combination of a $\\gamma=100$ \\bbeam with an \\spl-based superbeam, in which all relevant cross sections can be measured in a self-consistent way. This provides a performance, second only to the neutrino factory. For other superbeam experiments such as \\lbno and the setups studied in the context of the \\lbne reconfiguration effort, statistics turns out to be the bottleneck. In almost all cases, the near detector is not critical to control systematics since the combined fit of appearance and disappearance data already constrains the impact of systematics to be small provided that the three active flavor oscillation framework is valid.

  12. Baseline risk assessment for exposure to contaminants at the St. Louis Site, St. Louis, Missouri

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    The St. Louis Site comprises three noncontiguous areas in and near St. Louis, Missouri: the St. Louis Downtown Site (SLDS), the St. Louis Airport Storage Site (SLAPS), and the Latty Avenue Properties. The main site of the Latty Avenue Properties includes the Hazelwood Interim Storage Site (HISS) and the Futura Coatings property, which are located at 9200 Latty Avenue. Contamination at the St. Louis Site is the result of uranium processing and disposal activities that took place from the 1940s through the 1970s. Uranium processing took place at the SLDS from 1942 through 1957. From the 1940s through the 1960s, SLAPS was used as a storage area for residues from the manufacturing operations at SLDS. The materials stored at SLAPS were bought by Continental Mining and Milling Company of Chicago, Illinois, in 1966, and moved to the HISS/Futura Coatings property at 9200 Latty Avenue. Vicinity properties became contaminated as a result of transport and movement of the contaminated material among SLDS, SLAPS, and the 9200 Latty Avenue property. This contamination led to the SLAPS, HISS, and Futura Coatings properties being placed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA). The US Department of Energy (DOE) is responsible for cleanup activities at the St. Louis Site under its Formerly Utilized Sites Remedial Action Program (FUSRAP). The primary goal of FUSRAP is the elimination of potential hazards to human health and the environment at former Manhattan Engineer District/Atomic Energy Commission (MED/AEC) sites so that, to the extent possible, these properties can be released for use without restrictions. To determine and establish cleanup goals for the St. Louis Site, DOE is currently preparing a remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS). This baseline risk assessment (BRA) is a component of the process; it addresses potential risk to human health and the environment associated wi

  13. Level 3 baseline risk evaluation for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Golden, K.M.; Robers, S.K.; Cretella, F.M.

    1994-12-01T23:59:59.000Z

    This report presents the results of the Level 3 Baseline Risk Evaluation (BRE) performed on Building 3506 located at the Oak Ridge National Laboratory (ORNL). This BRE is intended to provide an analysis of the potential for adverse health effects (current or future) posed by contaminants at the facility. The decision was made to conduct a Level 3 (least rigorous) BRE because only residual contamination exists in the building. Future plans for the facility (demolition) also preclude a rigorous analysis. Site characterization activities for Building 3506 were conducted in fall of 1993. Concrete core samples were taken from the floors and walls of both the cell and the east gallery. These cores were analyzed for radionuclides and organic and inorganic chemicals. Smear samples and direct radiation measurements were also collected. Sediment exists on the floor of the cell and was also analyzed. To adequately characterize the risks posed by the facility, receptors for both current and potential future land uses were evaluated. For the current land use conditions, two receptors were evaluated. The first receptor is a hypothetical maintenance worker who spends 250 days (8 hours/day) for 25 years working in the facility. The remaining receptor evaluated is a hypothetical S and M worker who spends 2 days (8 hours/day) per year for 25 years working within the facility. This particular receptor best exemplifies the current worker scenario for the facility. The two current exposure scenarios and parameters of exposure (e.g., inhalation and ingestion rates) have been developed to provide a conservative (i.e. health protective) estimate of potential exposure.

  14. Baseline Serum Testosterone in Men Treated With Androgen Deprivation Therapy and Radiotherapy for Localized Prostate Cancer

    SciTech Connect (OSTI)

    Roach, Mack, E-mail: mroach@radonc.ucsf.ed [University of California-San Francisco, CA (United States); Bae, Kyounghwa [Department of Statistics, Radiation Therapy Oncology Group, Philadelphia, PA (United States); Lawton, Colleen [Medical College of Wisconsin (United States); Donnelly, B.J. [University of Calgary (Canada); Grignon, David [Indiana University, Indianapolis, IN (United States); Hanks, Gerald E. [Fox Chase Cancer Center, Health Science, 333 Cottman Avenue, Philadelphia, PA 19111-2497 (United States); Porter, Arthur [McGill University (Canada); Lepor, Herbert [New York University School of Medicine, New York, NY (United States); Venketesan, Varagur [London Regional Cancer Program and University of Western Ontario (Canada); Sandler, Howard [Cedar-Sinai, Los Angeles, CA (United States)

    2010-12-01T23:59:59.000Z

    Introduction: It is believed that men diagnosed with prostate cancer and a low baseline serum testosterone (BST) may have more aggressive disease, and it is frequently recommended they forgo testosterone replacement therapy. We used two large Phase III trials involving androgen deprivation therapy and external beam radiation therapy to assess the significance of a BST. Methods and Materials: All patients with a BST and complete data (n = 2,478) were included in this analysis and divided into four categories: 'Very Low BST' (VLBST) {<=}16.5th percentile of BST ({<=}248 ng/dL; n = 408); 'Low BST' (LBST) >16.5th percentile and {<=}33rd percentile (>248 ng/dL but {<=}314 ng/dL; n = 415); 'Average BST' (ABST) >33rd percentile and {<=}67th percentile (314-437 ng/dL; n = 845); and 'High BST' (HBST) >67th percentile (>437 ng/dL; n = 810). Outcomes included overall survival, distant metastasis, biochemical failure, and cause-specific survival. All outcomes were adjusted for the following covariates: treatment arm, BST, age (<70 vs. {>=}70), prostate-specific antigen (PSA; <10 vs. 10 {<=} PSA <20 vs. 20 {<=}), Gleason score (2-6 vs. 7 vs. 8-10); T stage (T1-T2 vs. T3-T4), and Karnofsky Performance Status (60-90 vs. 100). Results: On multivariable analysis age, Gleason score, and PSA were independently associated with an increased risk of biochemical failure, distant metastasis and a reduced cause-specific and overall survival (p < 0.05), but BST was not. Conclusions: BST does not affect outcomes in men treated with external beam radiation therapy and androgen deprivation therapy for prostate cancer.

  15. Search for sterile neutrino mixing in the MINOS long baseline experiment

    SciTech Connect (OSTI)

    Adamson, P.; /Fermilab; Andreopoulos, C.; /Rutherford; Auty, D.J.; /Sussex U.; Ayres, D.S.; /Argonne; Backhouse, C.; /Oxford U.; Barnes Jr., P.D.; /LLNL, Livermore; Barr, G.; /Oxford U.; Barrett, W.L.; /Western Washington U.; Bishai, M.; /Brookhaven; Blake, A.; /Cambridge U.; Bock, G.J.; /Fermilab /Fermilab

    2010-01-01T23:59:59.000Z

    A search for depletion of the combined flux of active neutrino species over a 735 km baseline is reported using neutral-current interaction data recorded by the MINOS detectors in the NuMI neutrino beam. Such a depletion is not expected according to conventional interpretations of neutrino oscillation data involving the three known neutrino flavors. A depletion would be a signature of oscillations or decay to postulated noninteracting sterile neutrinos, scenarios not ruled out by existing data. From an exposure of 3.18 x 10{sup 20} protons on target in which neutrinos of energies between {approx}500 MeV and 120 GeV are produced predominantly as {nu}{sub {mu}}, the visible energy spectrum of candidate neutral-current reactions in the MINOS far-detector is reconstructed. Comparison of this spectrum to that inferred from a similarly selected near-detector sample shows that of the portion of the {nu}{sub {mu}} flux observed to disappear in charged-current interaction data, the fraction that could be converting to a sterile state is less than 52% at 90% confidence level (C.L.). The hypothesis that active neutrinos mix with a single sterile neutrino via oscillations is tested by fitting the data to various models. In the particular four-neutrino models considered, the mixing angles {theta}{sub 24} and {theta}{sub 34} are constrained to be less than 11{sup o} and 56{sup o} at 90% C.L., respectively. The possibility that active neutrinos may decay to sterile neutrinos is also investigated. Pure neutrino decay without oscillations is ruled out at 5.4 standard deviations. For the scenario in which active neutrinos decay into sterile states concurrently with neutrino oscillations, a lower limit is established for the neutrino decay lifetime {tau}{sub 3}/m{sub 3} > 2.1 x 10{sup -12} s/eV at 90% C.L.

  16. Evaluation of final waste forms and recommendations for baseline alternatives to group and glass

    SciTech Connect (OSTI)

    Bleier, A.

    1997-09-01T23:59:59.000Z

    An assessment of final waste forms was made as part of the Federal Facilities Compliance Agreement/Development, Demonstration, Testing, and Evaluation (FFCA/DDT&E) Program because supplemental waste-form technologies are needed for the hazardous, radioactive, and mixed wastes of concern to the Department of Energy and the problematic wastes on the Oak Ridge Reservation. The principal objective was to identify a primary waste-form candidate as an alternative to grout (cement) and glass. The effort principally comprised a literature search, the goal of which was to establish a knowledge base regarding four areas: (1) the waste-form technologies based on grout and glass, (2) candidate alternatives, (3) the wastes that need to be immobilized, and (4) the technical and regulatory constraints on the waste-from technologies. This report serves, in part, to meet this goal. Six families of materials emerged as relevant; inorganic, organic, vitrified, devitrified, ceramic, and metallic matrices. Multiple members of each family were assessed, emphasizing the materials-oriented factors and accounting for the fact that the two most prevalent types of wastes for the FFCA/DDT&E Program are aqueous liquids and inorganic sludges and solids. Presently, no individual matrix is sufficiently developed to permit its immediate implementation as a baseline alternative. Three thermoplastic materials, sulfur-polymer cement (inorganic), bitumen (organic), and polyethylene (organic), are the most technologically developed candidates. Each warrants further study, emphasizing the engineering and economic factors, but each also has limitations that regulate it to a status of short-term alternative. The crystallinity and flexible processing of sulfur provide sulfur-polymer cement with the highest potential for short-term success via encapsulation. Long-term immobilization demands chemical stabilization, which the thermoplastic matrices do not offer. Among the properties of the remaining candidates, those of glass-ceramics (devitrified matrices) represent the best compromise for meeting the probable stricter disposal requirements in the future.

  17. Level III baseline risk evaluation for Building 3505 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Mostella, W.B. Jr.

    1994-12-01T23:59:59.000Z

    The Level III Baseline Risk Evaluation (BRE) for Building 3505, the ORNL Metal Recovery Facility, provides an analysis of the potential for adverse health effects, current or future, associated with the presence of hazardous substances in the building. The Metal Recovery Facility was used from 1952 through 1960 to process large quantities of radioactive material using the PUREX process for the recovery of uranium-238, plutonium-239, neptunium-237, and americium-241. The facility consists of seven process cells (A through G), a canal, a dissolver room, a dissolver pit, an office, locker room, storage area, control room, electrical gallery, shop, and makeup area. The cells were used to house the nuclear fuel reprocessing equipment, and the canal was constructed to be used as a water-shielded transfer canal. Currently, there are no known releases of radioactive contaminants from Building 3505. To perform the BRE, historical radiological survey data were used to estimate the concentration of alpha- and beta/gamma emitting radionuclides in the various cells, rooms, and other areas in Building 3505. Data from smear surveys were used to estimate the amount of transferable contamination (to which receptors can be exposed via inhalation and ingestion), and data from probe surveys were used to estimate the amount of both fixed and transferable contamination (from which receptors can receive external exposure). Two land use scenarios, current and future, and their subsequent exposure scenarios were explored in the BRE. Under the current land use scenario, two exposure scenarios were evaluated. The first was a worst-case industrial exposure scenario in which the receptor is a maintenance worker who works 8 hours/day, 350 days/year in the building for 25 years. In the second, more realistic exposure scenario, the receptor is a surveillance and maintenance (S&M) worker who spends two 8-hour days/year in the building for 25 years.

  18. Determination of Baselines for Evaluation and Promotion of Energy Efficiency in Wastewater Treatment Facilities

    E-Print Network [OSTI]

    Chow, S. A.; Ganji, A. R.; Fok, S.

    to facilitate the design and implementation of energy efficiency and demand response programs in wastewater treatment plants for PG&E?s 2009-2011 program cycle. An overview of activities by PG&E and the U.S. to promote energy efficiency in wastewater..., research and development project addressing energy efficiency in these plants, case studies on energy efficient equipment and best practices. Information gathered from the literature search was used in conjunction with the administered survey...

  19. MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives

    E-Print Network [OSTI]

    MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives vessel registries to conduct recreational catch and effort surveys. Develop a recreational fishing. Accuracy Funded 2012 Oregon Shore and EstuaryBoat Survey Design Review Develop a new or revised

  20. Little Big Horn River Water Quality Project

    SciTech Connect (OSTI)

    Bad Bear, D.J.; Hooker, D. [Little Big Horn Coll., Crow Agency, MT (United States)

    1995-10-01T23:59:59.000Z

    This report summarizes the accomplishments of the Water Quality Project on the Little Big horn River during the summer of 1995. The majority of the summer was spent collecting data on the Little Big Horn River, then testing the water samples for a number of different tests which was done at the Little Big Horn College in Crow Agency, Montana. The intention of this study is to preform stream quality analysis to gain an understanding of the quality of selected portion of the river, to assess any impact that the existing developments may be causing to the environment and to gather base-line data which will serve to provide information concerning the proposed development. Citizens of the reservation have expressed a concern of the quality of the water on the reservation; surface waters, ground water, and well waters.

  1. Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate

    SciTech Connect (OSTI)

    Warren, R.N.

    1998-09-29T23:59:59.000Z

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

  2. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    SciTech Connect (OSTI)

    Daniel P. Connell

    2009-01-12T23:59:59.000Z

    The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  3. Greenidge Multi-Pollutant Control Project

    SciTech Connect (OSTI)

    Daniel Connell

    2008-10-18T23:59:59.000Z

    The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. About 44% of the funding for the project was provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and the remaining 56% was provided by AES Greenidge. Project goals included reducing high-load NO{sub x} emissions to {le} 0.10 lb/mmBtu; reducing SO{sub 2}, SO{sub 3}, HCl, and HF emissions by at least 95%; and reducing Hg emissions by at least 90% while the unit fired 2-4% sulfur eastern U.S. bituminous coal and co-fired up to 10% biomass. This report details the final results from the project. The multi-pollutant control system was constructed in 2006, with a total plant cost of $349/kW and a footprint of 0.4 acre - both substantially less than would have been required to retrofit AES Greenidge Unit 4 with a conventional SCR and wet scrubber. Start-up of the multi-pollutant control system was completed in March 2007, and the performance of the system was then evaluated over an approximately 18-month period of commercial operation. Guarantee tests conducted in March-June 2007 demonstrated attainment of all of the emission reduction goals listed above. Additional tests completed throughout the performance evaluation period showed 96% SO{sub 2} removal, 98% mercury removal (with no activated carbon injection), 95% SO{sub 3} removal, and 97% HCl removal during longer-term operation. Greater than 95% SO{sub 2} removal efficiency was observed even when the unit fired high-sulfur coals containing up to 4.8 lb SO{sub 2}/mmBtu. Particulate matter emissions were reduced by more than 98% relative to the emission rate observed prior to installation of the technology. The performance of the hybrid SNCR/SCR system was affected by problems with large particle ash, ammonia slip, and nonideal combustion characteristics, and high-load NO{sub x} emissions averaged 0.14 lb/mmBtu during long-term operation. Nevertheless, the system has reduced the unit's overall NO{sub x} emiss

  4. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    SciTech Connect (OSTI)

    Renfro, G.G.

    1994-12-20T23:59:59.000Z

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices.

  5. Short-baseline electron neutrino disappearance, tritium beta decay, and neutrinoless double-beta decay

    SciTech Connect (OSTI)

    Giunti, Carlo; Laveder, Marco [INFN, Sezione di Torino, Via P. Giuria 1, I-10125 Torino (Italy); Dipartimento di Fisica G. Galilei, Universita di Padova, and INFN, Sezione di Padova, Via F. Marzolo 8, I-35131 Padova (Italy)

    2010-09-01T23:59:59.000Z

    We consider the interpretation of the MiniBooNE low-energy anomaly and the gallium radioactive source experiments anomaly in terms of short-baseline electron neutrino disappearance in the framework of 3+1 four-neutrino mixing schemes. The separate fits of MiniBooNE and gallium data are highly compatible, with close best-fit values of the effective oscillation parameters {Delta}m{sup 2} and sin{sup 2}2{theta}. The combined fit gives {Delta}m{sup 2}(greater-or-similar sign)0.1 eV{sup 2} and 0.11(less-or-similar sign)sin{sup 2}2{theta}(less-or-similar sign)0.48 at 2{sigma}. We consider also the data of the Bugey and Chooz reactor antineutrino oscillation experiments and the limits on the effective electron antineutrino mass in {beta} decay obtained in the Mainz and Troitsk tritium experiments. The fit of the data of these experiments limits the value of sin{sup 2}2{theta} below 0.10 at 2{sigma}. Considering the tension between the neutrino MiniBooNE and gallium data and the antineutrino reactor and tritium data as a statistical fluctuation, we perform a combined fit which gives {Delta}m{sup 2}{approx_equal}2 eV and 0.01(less-or-similar sign)sin{sup 2}2{theta}(less-or-similar sign)0.13 at 2{sigma}. Assuming a hierarchy of masses m{sub 1}, m{sub 2}, m{sub 3}<

  6. INITIAL COMPARISON OF BASELINE PHYSICAL AND MECHANICAL PROPERTIES FOR THE VHTR CANDIDATE GRAPHITE GRADES

    SciTech Connect (OSTI)

    Carroll, Mark C

    2014-09-01T23:59:59.000Z

    High-purity graphite is the core structural material of choice in the Very High Temperature Reactor (VHTR) design, a graphite-moderated, helium-cooled configuration that is capable of producing thermal energy for power generation as well as process heat for industrial applications that require temperatures higher than the outlet temperatures of present nuclear reactors. The Baseline Graphite Characterization Program is endeavoring to minimize the conservative estimates of as-manufactured mechanical and physical properties in nuclear-grade graphites by providing comprehensive data that captures the level of variation in measured values. In addition to providing a thorough comparison between these values in different graphite grades, the program is also carefully tracking individual specimen source, position, and orientation information in order to provide comparisons both in specific properties and in the associated variability between different lots, different billets, and different positions from within a single billet. This report is a preliminary comparison between each of the grades of graphite that are considered “candidate” grades from four major international graphite producers. These particular grades (NBG-18, NBG-17, PCEA, IG-110, and 2114) are the major focus of the evaluations presently underway on irradiated graphite properties through the series of Advanced Graphite Creep (AGC) experiments. NBG-18, a medium-grain pitch coke graphite from SGL from which billets are formed via vibration molding, was the favored structural material in the pebble-bed configuration. NBG-17 graphite from SGL is essentially NBG-18 with the grain size reduced by a factor of two. PCEA, petroleum coke graphite from GrafTech with a similar grain size to NBG-17, is formed via an extrusion process and was initially considered the favored grade for the prismatic layout. IG-110 and 2114, from Toyo Tanso and Mersen (formerly Carbone Lorraine), respectively, are fine-grain grades produced via an isomolding process. An analysis of the comparison between each of these grades will include not only the differences in fundamental and statistically-significant individual strength levels, but also the differences in variability in properties within each of the grades that will ultimately provide the basis for the prediction of in-service performance. The comparative performance of the different types of nuclear-grade graphites will continue to evolve as thousands more specimens are fully characterized from the numerous grades of graphite being evaluated.

  7. Echo Meadows Project Winter Artificial Recharge.

    SciTech Connect (OSTI)

    Ziari, Fred

    2002-12-19T23:59:59.000Z

    This report discusses the findings of the Echo Meadows Project (BPA Project 2001-015-00). The main purpose of this project is to artificially recharge an alluvial aquifer, WITH water from Umatilla River during the winter high flow period. In turn, this recharged aquifer will discharge an increased flow of cool groundwater back to the river, thereby improving Umatilla River water quality and temperature. A considerable side benefit is that the Umatilla River should improve as a habitat for migration, spanning, and rearing of anadromous and resident fish. The scope of this project is to provide critical baseline information about the Echo Meadows and the associated reach of the Umatilla River. Key elements of information that has been gathered include: (1) Annual and seasonal groundwater levels in the aquifer with an emphasis on the irrigation season, (2) Groundwater hydraulic properties, particularly hydraulic conductivity and specific yield, and (3) Groundwater and Umatilla River water quality including temperature, nutrients and other indicator parameters. One of the major purposes of this data gathering was to develop input to a groundwater model of the area. The purpose of the model is to estimate our ability to recharge this aquifer using water that is only available outside of the irrigation season (December through the end of February) and to estimate the timing of groundwater return flow back to the river. We have found through the data collection and modeling efforts that this reach of the river had historically returned as much as 45 cubic feet per second (cfs) of water to the Umatilla River during the summer and early fall. However, this return flow was reduced to as low as 10 cfs primarily due to reduced quantities of irrigation application, gain in irrigation efficiencies and increased groundwater pumping. Our modeling indicated that it is possible to restore these critical return flows using applied water outside of the irrigation season. We further found that this water can be timed to return to the river during the desired time of the year (summer to early fall). This is because the river stage, which remains relatively high until this time, drops during the irrigation season-thereby releasing the stored groundwater and increasing river flows. A significant side benefit is that these enhanced groundwater return flows will be clean and cold, particularly as compared to the Umatilla River. We also believe that this same type of application of water could be done and the resulting stream flows could be realized in other watersheds throughout the Pacific Northwest. This means that it is critical to compare the results from this baseline report to the full implementation of the project in the next phase. As previously stated, this report only discusses the results of data gathered during the baseline phase of this project. We have attempted to make the data that has been gathered accessible with the enclosed databases and spreadsheets. We provide computer links in this report to the databases so that interested parties can fully evaluate the data that has been gathered. However, we cannot emphasize too strongly that the real value of this project is to implement the phases to come, compare the results of these future phases to this baseline and develop the science and strategies to successfully implement this concept to other rivers in the Pacific Northwest. The results from our verified and calibrated groundwater model matches the observed groundwater data and trends collected during the baseline phase. The modeling results indicate that the return flows may increase to their historic values with the addition of 1 acre-ft/acre of recharge water to the groundwater system (about 9,600 acre-feet total). What this means is that through continued recharge project, you can double to quadruple the annual baseflow of the Umatilla River during the low summer and fall flow periods as compared to the present base-flow. The cool and high quality recharge water is a significant beneficial impact to the river system.

  8. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters.

  9. Senior projectS corporate Sponsored

    E-Print Network [OSTI]

    Stuart, Josh

    --Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

  10. Livingston Campus Geothermal Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

  11. Microbial enhanced waterflooding pilot project, Mink Unit, Delaware-Childers (OK) field

    SciTech Connect (OSTI)

    Bryant, R.S.; Burchfield, T.E.; Dennis, D.M.; Hitzman, D.O.

    1991-08-01T23:59:59.000Z

    The first microbial-enhanced waterflood field project was initiated in October of 1986. The site selected for the project is in the Mink Unit of Delaware-Childers field in Nowata County, Oklahoma. The pilot area consists of four adjacent inverted five-spot patterns drilled on 5-acre spacing. There are 21 injection and 15 production wells on this pilot. Four of the 21 injection wells were treated with microbial formulation. Laboratory screening criteria were developed to evaluate microorganisms for this project. Several different microbial formulations were tested. Injectivity and microbial field survivability tests were conducted during the baseline period on two off-pattern wells, and a chemical tracer, fluorescein, was injected into the four injection wells during the baseline period. Methodologies for field applications of microorganisms in ongoing waterfloods were developed as a result of this project. Results from the field pilot showed that microorganisms could be injected into an ongoing waterflood without causing any problems in injectivity. Microbial treatment did improve oil production rate, and water/oil ratios for producing wells nearest the microbially treated injection wells continue to be more favorable than baseline values. 23 refs., 30 figs., 28 tabs.

  12. Renewable Diesel from Algal Lipids: An Integrated Baseline for Cost, Emissions, and Resource Potential from a Harmonized Model

    SciTech Connect (OSTI)

    Davis, R.; Fishman, D.; Frank, E. D.; Wigmosta, M. S.; Aden, A.; Coleman, A. M.; Pienkos, P. T.; Skaggs, R. J.; Venteris, E. R.; Wang, M. Q.

    2012-06-01T23:59:59.000Z

    The U.S. Department of Energy's Biomass Program has begun an initiative to obtain consistent quantitative metrics for algal biofuel production to establish an 'integrated baseline' by harmonizing and combining the Program's national resource assessment (RA), techno-economic analysis (TEA), and life-cycle analysis (LCA) models. The baseline attempts to represent a plausible near-term production scenario with freshwater microalgae growth, extraction of lipids, and conversion via hydroprocessing to produce a renewable diesel (RD) blendstock. Differences in the prior TEA and LCA models were reconciled (harmonized) and the RA model was used to prioritize and select the most favorable consortium of sites that supports production of 5 billion gallons per year of RD. Aligning the TEA and LCA models produced slightly higher costs and emissions compared to the pre-harmonized results. However, after then applying the productivities predicted by the RA model (13 g/m2/d on annual average vs. 25 g/m2/d in the original models), the integrated baseline resulted in markedly higher costs and emissions. The relationship between performance (cost and emissions) and either productivity or lipid fraction was found to be non-linear, and important implications on the TEA and LCA results were observed after introducing seasonal variability from the RA model. Increasing productivity and lipid fraction alone was insufficient to achieve cost and emission targets; however, combined with lower energy, less expensive alternative technology scenarios, emissions and costs were substantially reduced.

  13. 4 ESS switch electromagnetic pulse assessment. Volume 1. Test-bed design installation, and baselining. Final report

    SciTech Connect (OSTI)

    Not Available

    1989-06-19T23:59:59.000Z

    The content of this report is defined by paragraph 3/1 of the Statement of Work for contract DCA100-88-C-0027. This report documents Task 1 and 2, Test-Bed Design, Installation, and Baselining of the 4 ESS Switch Electromagnetic Pulse (EMP) Assessment Program. ATT has engineered an operational digital 4 ESS switch for the purpose of testing the susceptibility of 4 ESS switch systems to high-altitude EMP. The switch is installed in two specially designed trailers that are transparent to electro-magnetic radiation and is located in Colorado Springs, Colorado, where current-injection testing and further performance baselining is presently underway. Batteries, air conditioning, and spare parts are housed in two additional trailers. ATT Bell Laboratories has developed and implemented a test system for generating current pulses, monitoring the pulses, generating calls, and measuring switch performance. Digital traffic has been successfully generated and switched for three signaling systems: Multifrequency (MF); Common Channel Signaling System 7 (CCS7); and Q.931 (used on direct Integrated Services Digital Network connections). Due to problems in acquiring properly engineered signaling-translation software, however, the CCS7 and Q.931 signaling systems have not yet been implemented with a full complement of trunk assignments. Subsequent tasks will entail further baselining, provisioning of backup methods for the operating software, and current-injection testing of the switch.

  14. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determine what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.

  15. {sup 18}Ne production for the Beta beams project

    SciTech Connect (OSTI)

    Hodák, Rastislav [Institute of Experimental and Applied Physics, CTU in Prague, Horská 3/22a, CZ-12800 Prague (Czech Republic); Mendonça, Tania M. [IFIMUP and IN - Institute of Nanosciences and Nanotechnologies, Rua do Campo Alegre 687, 4169-007 Porto, Portugal and CERN, CH-1211 Geneva 23 (Swaziland); Stora, Thierry [CERN, CH-1211 Geneva 23 (Switzerland)

    2013-12-30T23:59:59.000Z

    Intense relativistic (anti)neutrino beams are an unique tool required to study fundamental properties of neutrinos such as neutrino oscillation parameters, as well as their Majorana or Dirac nature, the lepton number conservation hypothesis and the absolute neutrino mass scale. Such beams originate from acceleration of ?-decaying radioactive ions (“Beta beams”). A molten fluoride salt target has been developed for the production of the required rates of low-Q baseline isotope {sup 18}Ne for the Beta beams project. The prototyped unit has been tested on-line at ISOLDE-CERN. In this contribution an overview of the prototyping and on-line tests is presented.

  16. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ

    2008-07-10T23:59:59.000Z

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

  17. IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

    SciTech Connect (OSTI)

    NONE

    1993-10-01T23:59:59.000Z

    Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

  18. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

  19. The 4-H Project

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

  20. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The ground water project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. This report is a site specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. Currently, no one is using the ground water and therefore, no one is at risk. However, the land will probably be developed in the future and so the possibility of people using the ground water does exist. This report examines the future possibility of health hazards resulting from the ingestion of contaminated drinking water, skin contact, fish ingestion, or contact with surface waters and sediments.

  2. GHPsRUS Project

    SciTech Connect (OSTI)

    Battocletti, Liz

    2013-07-09T23:59:59.000Z

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  3. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  4. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  5. Bacteria TMDL Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  6. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21T23:59:59.000Z

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  7. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  8. Product Guide Project Standard and Project Professional

    E-Print Network [OSTI]

    Narasayya, Vivek

    ................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

  9. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    SciTech Connect (OSTI)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09T23:59:59.000Z

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).

  10. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    SciTech Connect (OSTI)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01T23:59:59.000Z

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE`s Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry.

  11. DiFX: A software correlator for very long baseline interferometry using multi-processor computing environments

    E-Print Network [OSTI]

    A. T. Deller; S. J. Tingay; M. Bailes; C. West

    2007-02-06T23:59:59.000Z

    We describe the development of an FX style correlator for Very Long Baseline Interferometry (VLBI), implemented in software and intended to run in multi-processor computing environments, such as large clusters of commodity machines (Beowulf clusters) or computers specifically designed for high performance computing, such as multi-processor shared-memory machines. We outline the scientific and practical benefits for VLBI correlation, these chiefly being due to the inherent flexibility of software and the fact that the highly parallel and scalable nature of the correlation task is well suited to a multi-processor computing environment. We suggest scientific applications where such an approach to VLBI correlation is most suited and will give the best returns. We report detailed results from the Distributed FX (DiFX) software correlator, running on the Swinburne supercomputer (a Beowulf cluster of approximately 300 commodity processors), including measures of the performance of the system. For example, to correlate all Stokes products for a 10 antenna array, with an aggregate bandwidth of 64 MHz per station and using typical time and frequency resolution presently requires of order 100 desktop-class compute nodes. Due to the effect of Moore's Law on commodity computing performance, the total number and cost of compute nodes required to meet a given correlation task continues to decrease rapidly with time. We show detailed comparisons between DiFX and two existing hardware-based correlators: the Australian Long Baseline Array (LBA) S2 correlator, and the NRAO Very Long Baseline Array (VLBA) correlator. In both cases, excellent agreement was found between the correlators. Finally, we describe plans for the future operation of DiFX on the Swinburne supercomputer, for both astrophysical and geodetic science.

  12. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase 1) and the Ground Water Project (phase 2). For the UMTRA Project site located near Green River, Utah, the Surface Project cleanup occurred from 1988 to 1989. The tailings and radioactively contaminated soils and materials were removed from their original locations and placed into a disposal cell on the site. The disposal cell is designed to minimize radiation emissions and minimize further contamination of ground water beneath the site. The UMTRA Project`s second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. For the Green River site, the risk assessment helps determine whether human health risks result from exposure to ground water contaminated by uranium processing. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Green River site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards.

  13. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Salt Lake City, Utah. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of two phases: the first is the Surface Project, and the second is the Ground Water Project. For the UMTRA Project site known as the Vitro site, near Salt Lake City, Utah, Surface Project cleanup occurred from 1985 to 1987. The UMTRA Project`s second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. A risk assessment is the process of describing a source of contamination and showing how that contamination may reach people and the environment. The amount of contamination people or the environment may be exposed to is calculated and used to characterize the possible health or environmental effects that may result from this exposure. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Vitro site. The results of this report and further site characterization of the Vitro site will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards.

  14. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment.

  15. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    SciTech Connect (OSTI)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-04-01T23:59:59.000Z

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  16. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30T23:59:59.000Z

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  17. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  18. Scheme for generating and transporting THz radiation to the X-ray experimental floor at the LCLS baseline

    E-Print Network [OSTI]

    Geloni, Gianluca; Saldin, Evgeni

    2011-01-01T23:59:59.000Z

    This paper describes a novel scheme for integrating a coherent THz source in the baseline of the LCLS facility. Any method relying on the spent electron beam downstream of the baseline undulator should provide a way of transporting the radiation up to the experimental floor. Here we propose to use the dump area access maze. In this way the THz output must propagate with limited size at least for one hundred meters in a maze, following many turns, to reach the near experimental hall. The use of a standard, discrete, open beam-waveguide formed by periodic reflectors, that is a mirror guide, would lead to unacceptable size of the system. To avoid these problems, in this paper we propose an alternative approach based on periodically spaced metallic screens with holes. This quasi-optical transmission line is referred to as an iris line. We present complete calculations for the iris line using both analytical and numerical methods, which we find in good agreement. We present a design of a THz edge radiation source ...

  19. Baseline Flowsheet Generation for the Treatment and Disposal of Idaho National Engineering and Environmental Laboratory Sodium Bearing Waste

    SciTech Connect (OSTI)

    Barnes, C.M.; Lauerhass, L.; Olson, A.L.; Taylor, D.D.; Valentine, J.H.; Lockie, K.A. (DOE- ID)

    2002-01-16T23:59:59.000Z

    The High-Level Waste (HLW) Program at the Idaho National Engineering and Environmental Laboratory (INEEL) must implement technologies and processes to treat and qualify radioactive wastes located at the Idaho Nuclear Technology and Engineering Center (INTEC) for permanent disposal. This paper describes the approach and accomplishments to date for completing development of a baseline vitrification treatment flowsheet for sodium-bearing waste (SBW), including development of a relational database used to manage the associated process assumptions. A process baseline has been developed that includes process requirements, basis and assumptions, process flow diagrams, a process description, and a mass balance. In the absence of actual process or experimental results, mass and energy balance data for certain process steps are based on assumptions. Identification, documentation, validation, and overall management of the flowsheet assumptions are critical to ensuring an integrated, focused program. The INEEL HLW Program initially used a roadmapping methodology, developed through the INEEL Environmental Management Integration Program, to identify, document, and assess the uncertainty and risk associated with the SBW flowsheet process assumptions. However, the mass balance assumptions, process configuration and requirements should be accessible to all program participants. This need resulted in the creation of a relational database that provides formal documentation and tracking of the programmatic uncertainties related to the SBW flowsheet.

  20. Baseline Flowsheet Generation for the Treatment and Disposal of Idaho National Engineering and Environmental Laboratory Sodium Bearing Waste

    SciTech Connect (OSTI)

    Barnes, Charles Marshall; Lauerhass, Lance; Olson, Arlin Leland; Taylor, Dean Dalton; Valentine, James Henry; Lockie, Keith Andrew

    2002-02-01T23:59:59.000Z

    The High-Level Waste (HLW) Program at the Idaho National Engineering and Environmental Laboratory (INEEL) must implement technologies and processes to treat and qualify radioactive wastes located at the Idaho Nuclear Technology and Engineering Center (INTEC) for permanent disposal. This paper describes the approach and accomplishments to date for completing development of a baseline vitrification treatment flowsheet for sodium-bearing waste (SBW), including development of a relational database used to manage the associated process assumptions. A process baseline has been developed that includes process requirements, basis and assumptions, process flow diagrams, a process description, and a mass balance. In the absence of actual process or experimental results, mass and energy balance data for certain process steps are based on assumptions. Identification, documentation, validation, and overall management of the flowsheet assumptions are critical to ensuring an integrated, focused program. The INEEL HLW Program initially used a roadmapping methodology, developed through the INEEL Environmental Management Integration Program, to identify, document, and assess the uncertainty and risk associated with the SBW flowsheet process assumptions. However, the mass balance assumptions, process configuration and requirements should be accessible to all program participants. This need resulted in the creation of a relational database that provides formal documentation and tracking of the programmatic uncertainties related to the SBW flowsheet.

  1. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31T23:59:59.000Z

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ï?· Create a Showcase Waste Heat Recovery Demonstration Project.

  2. Environmental Audit of the Grand Junction Projects Office

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  3. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  4. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  5. Operational waste volume projection

    SciTech Connect (OSTI)

    Koreski, G.M.

    1996-09-20T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

  6. Project: BELLA Bldg. #: 71

    E-Print Network [OSTI]

    TO CONSTRUCTION AS OF 10/4/2011 Current/Approved Projects Project: Solar Energy Research Center Bldg. #:TBD. #: TBD Affected Area: R1 Road & V Road (58) Dates: 8/2011 - 9/2013 6 Small Projects: A. B50 Electrical/1/2014 N3 (58) 42 11/1/2011 2/1/2014 M-1 (35) 12 10/1/2010 11/1/2011 B81 (21) 18 10/1/2010 11/1/2011 V Road

  7. An integrated teamwork approach to regional FEMP project implementation

    SciTech Connect (OSTI)

    Jhaveri, A.

    1996-05-01T23:59:59.000Z

    With the establishment of Regional Energy Action Project (REAP) teams in Seattle, Chicago, and New York earlier this year, the U.S. Department of Energy`s Federal Energy Management Program (FEMP) has taken a quantum leap towards assisting Federal agencies meet the minimum 30% energy savings goal, through the year 2005 from the baseline year of 1985, per the Executive Order No. 12902. The three (3) member team, including the FEMP liaison, at these three (3) Support Offices, has significantly increased the manpower resources and expertise needed to implement FEMP projects through technical, financial, marketing, procurement, and contracting assistance in each region, thus complementing the limited resources of the participating Federal agencies. The potential and opportunities available in the four-state Region 10 (Washington, Oregon, Idaho, Alaska) for aggressively promoting FEMP projects are significant as demonstrated by some 20 completed SAVEnergy Action Plan Audits and as many as 10 energy efficiency projects with innovative financing arrangements, including but not limited to, agency appropriations, utility Demand Side Management (DSM), Energy Savings Performance Contract (ESPC) and third party financing handled by Energy Service Companies (ESCO`s), and/or combinations of these. This presentation will highlight some of the specific FEMP projects including partnership development, negotiations, coordination, and technical support models used to assist the selected Federal agency.

  8. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    SciTech Connect (OSTI)

    None given

    2000-12-01T23:59:59.000Z

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  9. Integrated data base report--1995: US spent nuclear fuel and radioactive waste inventories, projections, and characteristics

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    The information in this report summarizes the U.S. Department of Energy (DOE) data base for inventories, projections, and characteristics of domestic spent nuclear fuel and radioactive waste. This report is updated annually to keep abreast of continual waste inventory and projection changes in both the government and commercial sectors. Baseline information is provided for DOE program planning purposes and to support DOE program decisions. Although the primary purpose of this document is to provide background information for program planning within the DOE community, it has also been found useful by state and local governments, the academic community, and some private citizens.

  10. 2015 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

  11. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  12. Mascoma: Frontier Biorefinery Project

    Broader source: Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  13. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 85% Cleanup EVM represents Earned Value Management. FY2011 Second Quarter Overall Contract and Project Management Improvement...

  14. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 Fourth Quarter Overall Contract and Project Management Improvement...

  15. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 First Quarter Overall Contract and Project Management Performance...

  16. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 89% Cleanup EVM represents Earned Value Management. FY2011 Third Quarter Overall Contract and Project Management Improvement...

  17. Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  18. Project Finance Case Studies

    Broader source: Energy.gov [DOE]

    Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  19. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    capital asset line item projects (less than 50 million) are fully funded in one Fiscal Year (one Appropriation). NA NA Policy memorandum drafted and in review 12. Cost...

  20. TThe {\\sc Majorana} Project

    E-Print Network [OSTI]

    The MAJORANA collaboration

    2009-10-23T23:59:59.000Z

    The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  1. The MAJORANA project

    SciTech Connect (OSTI)

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  2. Energy Markets and Projections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Governors Association Governors' Advisors Energy Policy Institute July 24, 2014 | Washington, DC By Adam Sieminski, EIA Administrator Energy Markets and Projections NGA...

  3. Our Project Regional, community,

    E-Print Network [OSTI]

    Minnesota, University of

    City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

  4. Barstow Wind Turbine Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  5. Prison Solar Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  6. Here is a summary of the project guidelines and how points will be assigned. (1) Operational Definition. Identify a health behavior that you would like to

    E-Print Network [OSTI]

    Meagher, Mary

    Here is a summary of the project guidelines and how points will be assigned. (1) Operational and veggies, decrease smoking, flossing, etc.). You will need to be able to measure this behavior, therefore to support the new target behavior during the intervention phase. (25 pts) (4) BASELINE MEASUREMENT PHASE

  7. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Riverton, Wyoming. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of two phases: the Surface Project and the Ground Water Project. At the UMTRA Project site near Riverton, Wyoming, Surface Project cleanup occurred from 1988 to 1990. Tailings and radioactively contaminated soils and materials were taken from the Riverton site to a disposal cell in the Gas Hills area, about 60 road miles (100 kilometers) to the east. The surface cleanup reduces radon and other radiation emissions and minimizes further ground water contamination. The UMTRA Project`s second phase, the Ground Water Project, will evaluate the nature and extent of ground water contamination at the Riverton site that has resulted from the uranium ore processing activities. Such evaluations are used at each site to determine a strategy for complying with UMTRA ground water standards established by the US Environmental Protection Agency (EPA) and if human health risks could result from exposure to ground water contaminated by uranium ore processing. Exposure could hypothetically occur if drinking water were pumped from a well drilled in an area where ground water contamination might have occurred. Human health and environmental risks may also result if people, plants, or animals are exposed to surface water that has mixed with contaminated ground water.

  8. CE IGCC repowering project: Clean Coal II Project. Annual report, 1 January, 1992--31 December, 1992

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    CE is participating in a $270 million coal gasification combined cycle repowering project that will provide a nominal 60 MW of electricity to City, Water, light and Power (CWL and P) in Springfield, Illinois. The IGCC system will consist of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-Btu gas: and all necessary coal handling equipment. The project is currently in the second budget period of five. The major activities during this budgeted period are: Establishment of an approved for design (AFD) engineering package; development of a detailed cost estimate; resolution of project business issues; CWL and P renewal and replacement activities; and application for environmental air permits. The Project Management Plan was updated. The conceptual design of the plant was completed and a cost and schedule baseline for the project was established previously in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities are continuing. At the end of 1992 the major activities remaining for Budget Period two is to finish the cost estimate and complete the Continuation Request Documents.

  9. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  10. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program

    SciTech Connect (OSTI)

    Watkins, D.R.; Ammons, J.T.; Branson, J.L. [and others

    1993-10-01T23:59:59.000Z

    This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

  11. The Home Microbiome Project

    ScienceCinema (OSTI)

    Gilbert, Jack

    2014-09-15T23:59:59.000Z

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  12. Bacteria TMDL Projects

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of TMDL projects for water bodies where swimming or wading may be unsafe or harvesting of oysters is limited or prohibited due to high concentrations of bacteria. ? Atascosa River: A TMDL Project for Bacteria ? Buffalo andWhite Oak Bayous: A TMDL...

  13. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    NONE

    2007-06-15T23:59:59.000Z

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  14. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment.

  15. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    SciTech Connect (OSTI)

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20T23:59:59.000Z

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  16. Impacts of Climate Policy on Urban Air Pollution: Implications for Policy Design for Integrating Air-quality Co-benefits

    E-Print Network [OSTI]

    Impacts of Climate Policy on Urban Air Pollution: Implications for Policy Design for Integrating, Technology and Policy Program #12;#12;3 Impacts of Climate Policy on Urban Air Pollution: Implications climate change and urban air pollution and imply that opportunities exist to simultaneously deal

  17. Should We Consider the CoBenefits of Agricultural GHG Levan Elbakidze, Bruce A. McCarl

    E-Print Network [OSTI]

    McCarl, Bruce A.

    power plant activity would generate additional environmental costs amounting to about 50% of the value discussed case where a coal fired electrical powerplant, which is allocated fewer emission permits than allows both power generation and coal burning by-products, including commonly discussed air pollutants

  18. International Experiences with Quantifying the Co-Benefits of Energy-Efficiency and Greenhouse-Gas Mitigation Programs and Policies

    E-Print Network [OSTI]

    Williams, Christopher

    2014-01-01T23:59:59.000Z

    Working Group on Social Costs of Carbon, United States2010. Appendix 15A. Social Cost of Carbon for Regulatory

  19. International Experiences with Quantifying the Co-Benefits of Energy-Efficiency and Greenhouse-Gas Mitigation Programs and Policies

    E-Print Network [OSTI]

    Williams, Christopher

    2014-01-01T23:59:59.000Z

    model used to model energy demand growth in four sectors (activity days. 1. Energy demand forecast to increase by 150%and emissions growth as energy demand growth and economic

  20. Baseline concentrations of radionuclides and heavy metals in soils and vegetation around the DARHT facility: Construction phase (1996)

    SciTech Connect (OSTI)

    Fresquez, P.R.; Haagenstad, H.T.; Naranjo, L. Jr.

    1997-04-01T23:59:59.000Z

    As part of the Department of Energy`s Mitigation Action Plan for the Dual Axis Radiographic Hydrodynamic Test (DARHT) Facility at Los Alamos National Laboratory (LANL), baseline concentrations of radionuclides ({sup 3}H, {sup 137}Cs, {sup 90}Sr, {sup 238}Pu, {sup 239}Pu, {sup 241}Am, total U), and heavy metals (Ag, As, Ba, Be, Cd, Cr, Cu, Hg, Ni, Pb, Sb, Se and Tl) in soil, sediment, and vegetation (overstory and understory) around the DARHT facility during the construction phase in 1996 were determined. Also, U and Be concentrations in soil samples collected in 1993 from within the proposed DARHT facility area are reported. Most radionuclides in soils, sediments, and vegetation were within current background and/or long-term regional statistical reference levels.

  1. 86 GHz Very Long Baseline Polarimetry of 3C273 and 3C279 with the Coordinated Millimeter VLBI Array

    E-Print Network [OSTI]

    Joanne M. Attridge

    2001-04-18T23:59:59.000Z

    86 GHz Very Long Baseline Polarimetry probes magnetic field structures within the cores of Active Galactic Nuclei at higher angular resolutions and a spectral octave higher than previously achievable. Observations of 3C273 and 3C279 taken in April 2000 with the Coordinated Millimeter VLBI Array have resulted in the first total intensity (Stokes I) and linear polarization VLBI images reported of any source at 86 GHz. These results reveal the 86 GHz electric vector position angles within the jets of 3C273 and 3C279 to be orthogonal to each other, and the core of 3C273 to be unpolarized. If this lack of polarization is due to Faraday depolarization alone, the dispersion in rotation measure is >=90000 rad/m^2 for the core of 3C273.

  2. Dual baseline search for muon antineutrino disappearance at 0.1 eV²

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Cheng, G.; Huelsnitz, W.; Aguilar-Arevalo, A. A.; Alcaraz-Aunion, J. L.; Brice, S. J.; Brown, B. C.; Bugel, L.; Catala-Perez, J.; Church, E. D.; Conrad, J. M.; Dharmapalan, R.; Djurcic, Z.; Dore, U.; Finley, D. A.; Ford, R.; Franke, A. J.; Garcia, F. G.; Garvey, G. T.; Giganti, C.; Gomez-Cadenas, J. J.; Grange, J.; Guzowski, P.; Hanson, A.; Hayato, Y.; Hiraide, K.; Ignarra, C.; Imlay, R.; Johnson, R. A.; Jones, B. J. P.; Jover-Manas, G.; Karagiorgi, G.; Katori, T.; Kobayashi, Y. K.; Kobilarcik, T.; Kubo, H.; Kurimoto, Y.; Louis, W. C.; Loverre, P. F.; Ludovici, L.; Mahn, K. B. M.; Mariani, C.; Marsh, W.; Masuike, S.; Matsuoka, K.; McGary, V. T.; Metcalf, W.; Mills, G. B.; Mirabal, J.; Mitsuka, G.; Miyachi, Y.; Mizugashira, S.; Moore, C. D.; Mousseau, J.; Nakajima, Y.; Nakaya, T.; Napora, R.; Nienaber, P.; Orme, D.; Osmanov, B.; Otani, M.; Pavlovic, Z.; Perevalov, D.; Polly, C. C.; Ray, H.; Roe, B. P.; Russell, A. D.; Sanchez, F.; Shaevitz, M. H.; Shibata, T.-A.; Sorel, M.; Spitz, J.; Stancu, I.; Stefanski, R. J.; Takei, H.; Tanaka, H.-K.; Tanaka, M.; Tayloe, R.; Taylor, I. J.; Tesarek, R. J.; Uchida, Y.; Van de Water, R. G.; Walding, J. J.; Wascko, M. O.; White, D. H.; White, H. B.; Wickremasinghe, D. A.; Yokoyama, M.; Zeller, G. P.; Zimmerman, E. D.

    2012-09-01T23:59:59.000Z

    The MiniBooNE and SciBooNE collaborations report the results of a joint search for short baseline disappearance of ?¯? at Fermilab’s Booster Neutrino Beamline. The MiniBooNE Cherenkov detector and the SciBooNE tracking detector observe antineutrinos from the same beam, therefore the combined analysis of their data sets serves to partially constrain some of the flux and cross section uncertainties. Uncertainties in the ?? background were constrained by neutrino flux and cross section measurements performed in both detectors. A likelihood ratio method was used to set a 90% confidence level upper limit on ?¯? disappearance that dramatically improves upon prior limits in the ?m²=0.1–100 eV² region.

  3. VERY LONG BASELINE ARRAY MULTI-FREQUENCY POLARIMETRIC IMAGING OF RADIO-LOUD BROAD ABSORPTION LINE QUASARS

    SciTech Connect (OSTI)

    Hayashi, Takayuki J.; Nagai, Hiroshi [National Astronomical Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo, 181-8588 (Japan); Doi, Akihiro, E-mail: t.hayashi@nao.ac.jp [Institute of Space and Astronautical Science, Japan Aerospace Exploration Agency, 3-1-1 Yoshinodai, Chuo, Sagamihara, Kanagawa, 252-5210 (Japan)

    2013-07-20T23:59:59.000Z

    We conducted the first multi-frequency polarimetric imaging of four broad absorption line (BAL) quasars using the Very Long Baseline Array at milliarcsecond resolutions to investigate the inclination of the nonthermal jet and test the hypothesis that radio sources in BAL quasars are still young. Among these four sources, J0928+446, J1018+0530, and J1405+4056 show one-sided structures in parsec scales and polarized emission detected in the core. These characteristics are consistent with those of blazars. We set constraints on viewing angles to <66 Degree-Sign for these jets in the framework of a Doppler beaming effect. J1159+0112 exhibits an unpolarized gigahertz-peaked spectrum component and several discrete blobs with steep spectra on both sides of the central component across {approx}1 kpc. These properties are consistent with those of young radio sources. We discuss the structures of jets and active galactic nucleus wind.

  4. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    This document evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium mill site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1990 by the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine what remedial actions are necessary for contaminated ground water at the site.

  5. CONSTRAINING THE STRUCTURE OF SAGITTARIUS A*'s ACCRETION FLOW WITH MILLIMETER VERY LONG BASELINE INTERFEROMETRY CLOSURE PHASES

    SciTech Connect (OSTI)

    Broderick, Avery E. [Canadian Institute for Theoretical Astrophysics, 60 St. George Street, Toronto, ON M5S 3H8 (Canada); Fish, Vincent L.; Doeleman, Sheperd S. [Massachusetts Institute of Technology, Haystack Observatory, Route 40, Westford, MA 01886 (United States); Loeb, Abraham, E-mail: aeb@cita.utoronto.ca [Institute for Theory and Computation, Harvard University, Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States)

    2011-09-01T23:59:59.000Z

    Millimeter wave very long baseline interferometry (mm-VLBI) provides access to the emission region surrounding Sagittarius A* (Sgr A*), the supermassive black hole at the center of the Milky Way, on sub-horizon scales. Recently, a closure phase of 0{sup 0} {+-} 40{sup 0} was reported on a triangle of Earth-sized baselines (SMT-CARMA-JCMT) representing a new constraint upon the structure and orientation of the emission region, independent from those provided by the previously measured 1.3 mm-VLBI visibility amplitudes alone. Here, we compare this to the closure phases associated with a class of physically motivated, radiatively inefficient accretion flow models and present predictions for future mm-VLBI experiments with the developing Event Horizon Telescope (EHT). We find that the accretion flow models are capable of producing a wide variety of closure phases on the SMT-CARMA-JCMT triangle and thus not all models are consistent with the recent observations. However, those models that reproduce the 1.3 mm-VLBI visibility amplitudes overwhelmingly have SMT-CARMA-JCMT closure phases between {+-}30{sup 0}, and are therefore broadly consistent with all current mm-VLBI observations. Improving station sensitivity by factors of a few, achievable by increases in bandwidth and phasing together multiple antennas at individual sites, should result in physically relevant additional constraints upon the model parameters and eliminate the current 180{sup 0} ambiguity on the source orientation. When additional stations are included, closure phases of order 45{sup 0}-90{sup 0} are typical. In all cases, the EHT will be able to measure these with sufficient precision to produce dramatic improvements in the constraints upon the spin of Sgr A*.

  6. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  7. LIMB demonstration project extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21T23:59:59.000Z

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  8. NEPA COMPLIANCE SURVEY Project Information Project Title: Casing...

    Broader source: Energy.gov (indexed) [DOE]

    Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description nclude The...

  9. Kellogg and Russ Forest projects. 2002 Project sand highlights

    E-Print Network [OSTI]

    Kellogg and Russ Forest projects. 2002 Project sand highlights MacCready Reserve a new property of insects Galeerucella calmariensis,and G.pusilla to control purple loosestrife on May 13. #12;New Project

  10. NEPA COMPLIANCE SURVEY Project Information Project Title: South...

    Broader source: Energy.gov (indexed) [DOE]

    Facility 2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional...

  11. Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

  12. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Lakeview, Oregon. Revision 2

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the UMTRA Project site near Lakeview, Oregon, was completed in 1989. The mill operated from February 1958 to November 1960. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  13. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This document evaluates potential impacts to public health and the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1989 by the US DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, UMTRA Project is evaluating ground water contamination in this risk assessment.

  14. Self-Charging Battery Project

    SciTech Connect (OSTI)

    Yager, Eric

    2007-07-25T23:59:59.000Z

    In March 2006, a Cooperative Research and Development Agreement (CRADA) was formed between Fauton Tech, Inc. and INL to develop a prototype for a commercial application that incorporates some INL-developed Intellectual Properties (IP). This report presents the results of the work performed at INL during Phase 1. The objective of Phase 1 was to construct a prototype battery in a “D” cell form factor, determine optimized internal components for a baseline configuration using a standard coil design, perform a series of tests on the baseline configuration, and document the test results in a logbook.

  15. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15T23:59:59.000Z

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

  16. Flash Steam Recovery Project 

    E-Print Network [OSTI]

    Bronhold, C. J.

    2000-01-01T23:59:59.000Z

    /condensate recovery system, resulting in condensate flash steam losses to the atmosphere. Using computer simulation models and pinch analysis techniques, the Operational Excellence Group (Six Sigma) was able to identify a project to recover the flash steam losses as a...

  17. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  18. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17T23:59:59.000Z

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  19. Financing energy efficiency projects

    SciTech Connect (OSTI)

    Hansen, S.J.; Weisman, J.C. [Hansen Associates (United States)

    1999-07-01T23:59:59.000Z

    Getting an energy project financed should be a shared effort between the ESCO and the customer, but the perspectives are different. It is the ESCO`s responsibility to put together a bankable project. The ESCO typically arranges the financing. Its reputation and history often add surety, which offers financiers added confidence. The customer usually incurs the debt and needs to know the financing options available. This article first addresses what constitutes a bankable project from the ESCO perspective. Then, the types of financing available to owners are explored. ESCOs, who have been in this business for a few years, remember knocking on the financial doors until their knuckles were bloody. Today, the financiers knock on the ESCO doors...if, and it`s a big IF, ESCOs can put together bankable projects.

  20. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....