Powered by Deep Web Technologies
Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Microsoft Word - UPDATE 5 - Units 1,2 + base load unit.doc  

Broader source: Energy.gov (indexed) [DOE]

5 to: 5 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Cycling Units 1, 2 plus One Baseload Unit ENSR Corporation January 6, 2006 Document Number 10350-002-420 (Update 5) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of one baseload unit and two cycling units at Mirant's Potomac River Generating Station (PRGS). This mode of operation is also referred to as Option A in Mirant Potomac River LLC's December 30, 2005 letter to the U.S. Department of Energy regarding District of Columbia Public Service Commission, Docket No. EO-05- 01. The modeling was performed according to the Protocol approved by the Virginia Department of

2

WIPP Mobile Loading Unit Contract - 8-27-12  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Awards Contract for WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services Cincinnati, Ohio, August 27, 2012 - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The contract has a value of up to $17.8 million, with a three-year performance period and two- one year extension options. This contract was limited to Small Businesses. The Mobile Loading Unit contractor will load Contact Handled (CH) and Remote Handled (RH)

3

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load  

Broader source: Energy.gov (indexed) [DOE]

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Docket No. EO-05-01. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours. Arial photograph showing plant and location of predicted SO2 violations, predicted in 2000. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours More Documents & Publications Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

4

Definition: Base Load | Open Energy Information  

Open Energy Info (EERE)

Load Load Jump to: navigation, search Dictionary.png Base Load The minimum amount of electric power delivered or required over a given period at a constant rate.[1] View on Wikipedia Wikipedia Definition Baseload (also base load, or baseload demand) is the minimum amount of power that a utility or distribution company must make available to its customers, or the amount of power required to meet minimum demands based on reasonable expectations of customer requirements. Baseload values typically vary from hour to hour in most commercial and industrial areas. Related Terms electricity generation, power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in Like Like You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from

5

Bed load equation evaluation based on alluvial river data, India  

Science Journals Connector (OSTI)

The rate of bed load transport in weight per unit width for ... material has been computed by collecting the field data of Tapi River, in the monsoon season ... of this paper is to estimate the bed load carried b...

S. M. Yadav; B. K. Samtani

2008-11-01T23:59:59.000Z

6

The Development of a Small Engine Based Accelerated Ash Loading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Accelerated Ash Loading Protocol The Development of a Small Engine Based Accelerated Ash Loading Protocol Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan....

7

Power System Load Forecasting Based on EEMD and ANN  

Science Journals Connector (OSTI)

In order to fully mine the characteristics of load data and improve the accuracy of power system load forecasting, a load forecasting model based on Ensemble Empirical Mode ... is proposed in this paper. Firstly,...

Wanlu Sun; Zhigang Liu; Wenfan Li

2011-01-01T23:59:59.000Z

8

Liquefaction through expander for base load LNG  

SciTech Connect (OSTI)

New natural gas liquefaction process using turbo expander has been developed to improve process thermal efficiency. The new process consists of precooling section which uses refrigerant with shell and tube heat exchangers or brazed aluminum plate-fin exchangers or spool wound heat exchanger and liquefaction section by iso-entropic expander. As a result of design study, thermal efficiency of the new liquefaction process has been confirmed to be in the highest level compared with other liquefaction processes. Also, since the new liquefaction process is constructed with commonly available equipment in industry, it can be readily adapted to base load LNG plants of any capacity without requiring expensive and specially designed equipment.

Nakamura, Moritaka; Kikkawa, Yoshitsugi [Chiyoda Corp., Yokohama (Japan)

1998-12-31T23:59:59.000Z

9

Analysis of translational positioning of unit loads by directionally-oriented friction force fields  

Science Journals Connector (OSTI)

The objective of this study was numerical simulation and experimental examination of the process of translational positioning of a stream of unit loads (i.e. postal parcels) transported on conveyors. A system of two inversely-oriented fields of friction forces was used to perform the task of load positioning. In numerical investigations, one applied theoretical description of the positioning process based on the Karnopp's model of static friction and the dynamic friction model of LuGre. In the Karnopp's model, two classic friction coefficients were used (based on one or two parameters, respectively) and a nonlinear coefficient defined by a B-spline curve of third order (determined based on experimental results). The results of numerical investigation were verified by experiments, which consisted in translating the objects by a system of two inversely-driven belts. The analyses of numerical and experimental results indicated that the effectiveness of the positioning process is mostly influenced by nonlinearity of friction coefficient of the transported loads.

T. Piatkowski

2011-01-01T23:59:59.000Z

10

Load beam unit replaceable inserts for dry coal extrusion pumps  

DOE Patents [OSTI]

A track assembly for a particulate material extrusion pump according to an exemplary aspect of the present disclosure includes a link assembly with a roller bearing. An insert mounted to a load beam located such that the roller bearing contacts the insert.

Saunders, Timothy; Brady, John D.

2012-11-13T23:59:59.000Z

11

DOE Awards Contract for WIPP Mobile Loading Unit Services | Department of  

Broader source: Energy.gov (indexed) [DOE]

WIPP Mobile Loading Unit Services WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services August 27, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Bill.Taylor@srs.gov 803-952-8564 Deb Gill Deb.Gill@wipp.ws 575-234-7270 Cincinnati - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The contract has a value of up to $17.8 million, with a three-year performance period and two-one year extension options. This contract was limited to

12

Base load fuel comsumption with radiant boiler simulation  

SciTech Connect (OSTI)

The operating point of an oil fired radiant boiler, 580 Megawatt capacity, is critical in maximizing the availability, performance, reliability, and maintainability of a power producing system. Operating the unit above the design operating point causes outages to occur sooner than scheduled. When the boiler is operated below the design operating point, fuel is wasted because the quantity of fuel required to operate a radiant boiler is the same, whether the design setpoint is maintained or not. This paper demonstrates by means of simulation software that the boiler design setpoints is critical to fuel consumption and optimum output megawatts. A boiler with this capacity is used to provide a portion of the base load of an electric utility in order to sustain revenues and maintain reliable generation.

Shwehdi, M.H. (Pennsylvania State Univ., Wilkes-Barre, Lehman, PA (United States)); Hughes, C.M. (Naval Aviation Depot, NAS Jacksonville, Jacksonville, FL (United States)); Quasem, M.A. (Howard Univ. School of Business, Washington, DC (United States))

1992-12-01T23:59:59.000Z

13

Inventory logistics cost analysis model for the proposed EU intermodal loading unit -- A business case  

Science Journals Connector (OSTI)

This study focuses on the new initiative of the European Union (EU) which deals with simplifying the intermodal product shipment approach that may lead to improvement in the available transportation logistics infrastructure. The analysis involves determining ... Keywords: Intermodal loading unit, buffer stock, intermodal platforms, intermodal transportation, inventory in transit, logistics cost model, multimodal transportation

Sameer Kumar

2008-08-01T23:59:59.000Z

14

Breakout Session: Solar as a Base Load Power Source  

Broader source: Energy.gov [DOE]

Does solar have a future as a base load electricity source? This session explores a vision in which solar power plants can provide dispatchability, predictability, and reliability comparable to...

15

Part-Load Performance Characterization and Energy Savings Potential of the RTU Challenge Unit: Daikin Rebel  

SciTech Connect (OSTI)

In 2011, the U.S. Department of Energy’s Building Technology Office (DOE’s BTO), with help from the Better Buildings Alliance (BBA) members, developed a specification for high performance rooftop air-conditioning units (RTU Challenge) with capacity ranges between 10 and 20 tons (DOE 2013). Daikin’s Rebel for the first rooftop unit system that was recognized by DOE in May 2012 as meeting the RTU Challenge specifications. This report documents the development of part-load performance curves and its use with EnergyPlus simulation tool to estimate the potential savings from use of Rebel compared to other standard options.

Wang, Weimin; Katipamula, Srinivas

2013-09-30T23:59:59.000Z

16

Cost Bases for Incentive Rates Applicable to Industrial Loads  

E-Print Network [OSTI]

COST BASES FOR INCENTIVE RATES APPLICABLE TO INDUSTRIAL LOADS CARL N. STOVER, JR. Executive Vice President C. H. Guernsey &Company Oklahoma City, Oklahoma ABSTRACT Incentive rates applicable to industrial customers are presently receiving a... of the options are clearly discriminatory and relate only to short conditions while others are well founded on cost relationships . and offer a long-term alternative to both the utility and the industrial customer. The purpose of this paper is to discuss...

Stover, C. N.

17

Feature extraction and classification of load dynamic characteristics based on lifting wavelet packet transform in power system load modeling  

Science Journals Connector (OSTI)

Abstract Load dynamic characteristics classification and synthesis is the main approach to solve the problem of load time-variation. The basis and prerequisite of load dynamic characteristics classification is load dynamic characteristics feature extraction. Load model parameter space or the model response space gained by a standard voltage excitation is usually selected as the feature vector space in current practice of load dynamic characteristics feature extraction. However, both methods need to determine the load model structure and identify the model parameters. It would increase not only calculation error but also calculation time in the process of load model structure determination and parameter identification. Then the accuracy of the final classification results would be affected. It is reasonable and scientific to extract feature vector space of load dynamic characteristics directly from the measured response space. In this paper, a feature extraction method based on lifting wavelet packet transform is proposed for load dynamic characteristics classification. The load measured current response data is decomposed and reconstructed, then the wavelet packet coefficients can be extracted to construct energy moment based feature vector. On this basis, the load dynamic characteristics classification can be realized using fuzzy c-means (FCM) method. Finally, the validity and practicality of the proposed method have been proved by feature extraction and classification of dynamic simulation data acquired using Matlab/Simulink and field measurement data. Compared with traditional wavelet packet transform, the lifting wavelet packet transform has shown advantages both in computational speed and reconstruction error and can improve the accuracy of load dynamic characteristics classification.

Zhenshu Wang; Shaorun Bian; Ming Lei; Chuangang Zhao; Yan Liu; Zhifan Zhao

2014-01-01T23:59:59.000Z

18

An Automatic Load Sharing Approach for a DFIG Based Wind Generator in a Microgrid  

E-Print Network [OSTI]

An Automatic Load Sharing Approach for a DFIG Based Wind Generator in a Microgrid M. A. Barik and H generator. An automatic load sharing approach for a doubly-fed induction generator (DFIG) based wind is useful to manage the load variation of a microgrid. Index Terms--DFIG, load sharing, microgrid, pitch

Pota, Himanshu Roy

19

NEEMON Algorithm Based on Data Locality for Priority Based Dynamic Load Balancing in Distributed Database  

Science Journals Connector (OSTI)

A load balancing scheme comprises of three phases: information ... collection, decision making based on information and data migration. In distributed database, it is important to take data locality into account,...

Neera Batra; A. K. Kapil

2010-01-01T23:59:59.000Z

20

Multifaceted Simultaneous Load Balancing in DHT-Based P2P Systems: A New Game with  

E-Print Network [OSTI]

of the data (e.g., lexicographic ordering to enable range searches). 1 Introduction Load balancing problems-stealing and load-shedding schemes, in which peers share load with random peers, e.g., [6, 7], or power of twoMultifaceted Simultaneous Load Balancing in DHT-Based P2P Systems: A New Game with Old Balls

Aberer, Karl

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

ANUDlSiTM-40 Load Flow Analysis: Base Cases, Data, Diagrams, and Results  

Office of Scientific and Technical Information (OSTI)

ANUDlSiTM-40 ANUDlSiTM-40 Load Flow Analysis: Base Cases, Data, Diagrams, and Results by E.C. Portante, J.A. Kavicky, J.C. VanKuiken, and J.P. Peerenboom Decision and Information Sciences Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 October 1997 Work sponsored by Navy Engineering Logistics Office This report is printed on recycled paper. @ DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness. or use- fulness of any information, apparatus, product, or process disclosed, or represents

22

Cluster-Based Load Balancing Algorithms for Grids  

E-Print Network [OSTI]

E-science applications may require huge amounts of data and high processing power where grid infrastructures are very suitable for meeting these requirements. The load distribution in a grid may vary leading to the bottlenecks and overloaded sites. We describe a hierarchical dynamic load balancing protocol for Grids. The Grid consists of clusters and each cluster is represented by a coordinator. Each coordinator first attempts to balance the load in its cluster and if this fails, communicates with the other coordinators to perform transfer or reception of load. This process is repeated periodically. We analyze the correctness, performance and scalability of the proposed protocol and show from the simulation results that our algorithm balances the load by decreasing the number of high loaded nodes in a grid environment.

Payli, Resat Umit; Dagdeviren, Orhan

2011-01-01T23:59:59.000Z

23

Comparison of strength and load-based methods for testing wind turbine blades  

SciTech Connect (OSTI)

The purpose of this paper is to compare two methods of blade test loading and show how they are applied in an actual blade test. Strength and load-based methods were examined to determine the test load for an Atlantic Orient Corporation (AOC) 15/50 wind turbine blade for fatigue and static testing. Fatigue load-based analysis was performed using measured field test loads extrapolated for extreme rare events and scaled to thirty-year spectra. An accelerated constant amplitude fatigue test that gives equivalent damage at critical locations was developed using Miner`s Rule and the material S-N curves. Test load factors were applied to adjust the test loads for uncertainties, and differences between the test and operating environment. Similar analyses were carried, out for the strength-based fatigue test using the strength of the blade and the material properties to determine the load level and number of constant amplitude cycles to failure. Static tests were also developed using load and strength criteria. The resulting test loads were compared and contrasted. The analysis shows that, for the AOC 15/50 blade, the strength-based test loads are higher than any of the static load-based cases considered but were exceeded in the fatigue analysis for a severe hot/wet environment.

Musial, W.D.; Clark, M.E.; Egging, N. [and others

1996-11-01T23:59:59.000Z

24

Base-Load and Peak Electricity from a Combined Nuclear Heat and Fossil Combined-Cycle Plant  

SciTech Connect (OSTI)

A combined-cycle power plant is proposed that uses heat from a high-temperature reactor and fossil fuel to meet base-load and peak electrical demands. The high-temperature gas turbine produces shaft power to turn an electric generator. The hot exhaust is then fed to a heat recovery steam generator (HRSG) that provides steam to a steam turbine for added electrical power production. A simplified computational model of the thermal power conversion system was developed in order to parametrically investigate two different steady-state operation conditions: base load nuclear heat only from an Advanced High Temperature Reactor (AHTR), and combined nuclear heat with fossil heat to increase the turbine inlet temperature. These two cases bracket the expected range of power levels, where any intermediate power level can result during electrical load following. The computed results indicate that combined nuclear-fossil systems have the potential to offer both low-cost base-load electricity and lower-cost peak power relative to the existing combination of base-load nuclear plants and separate fossil-fired peak-electricity production units. In addition, electric grid stability, reduced greenhouse gases, and operational flexibility can also result with using the conventional technology presented here for the thermal power conversion system coupled with the AHTR.

Conklin, Jim [ORNL; Forsberg, Charles W [ORNL

2007-01-01T23:59:59.000Z

25

Base-Load and Peak Electricity from a Combined Nuclear Heat and Fossil Combined-Cycle Plant  

SciTech Connect (OSTI)

A combined-cycle power plant is proposed that uses heat from a high-temperature reactor and fossil fuel to meet base-load and peak electrical demands. The high temperature gas turbine produces shaft power to turn an electric generator. The hot exhaust is then fed to a heat recovery steam generator (HRSG) that provides steam to a steam turbine for added electrical power production. A simplified computational model of the thermal power conversion system was developed in order to parametrically investigate two different steady-state operation conditions: base load nuclear heat only from an Advanced High Temperature Reactor (AHTR), and combined nuclear heat with fossil heat to increase the turbine inlet temperature. These two cases bracket the expected range of power levels, where any intermediate power level can result during electrical load following. The computed results indicate that combined nuclear-fossil systems have the potential to offer both low-cost base-load electricity and lower-cost peak power relative to the existing combination of base-load nuclear plants and separate fossil-fired peak-electricity production units. In addition, electric grid stability, reduced greenhouse gases, and operational flexibility can also result with using the conventional technology presented here for the thermal power conversion system coupled with the AHTR. (authors)

Conklin, James C.; Forsberg, Charles W. [Oak Ridge National Laboratory, P.O. Box 2008, Oak Ridge, TN 37831 (United States)

2007-07-01T23:59:59.000Z

26

A Dynamic Attribute-Based Load Shedding Scheme for Data Stream Management Systems  

E-Print Network [OSTI]

A Dynamic Attribute-Based Load Shedding Scheme for Data Stream Management Systems Amit Ahuja of tuples, becomes imperative in data stream load shedding, since shedding a complete tuple would lead to shedding informative attribute data along with less-informative attribute data in the tuple. Our load

Ng, Yiu-Kai Dennis

27

Load flow analysis: Base cases, data, diagrams, and results  

SciTech Connect (OSTI)

This report describes how an electric utility system is modeled by using load flow techniques to establish a validated power flow case suitable for simulating and evaluating alternative system scenarios. Details of the load flow model are supported by additional technical and descriptive information intended to correlate modeled electrical system parameters with the corresponding physical equipment that makes up the system. Pictures and technical specifications of system equipment from the utility, public, or vendor are provided to support this association for many system components. The report summarizes the load flow model construction, simulation, and validation and describes the general capabilities of an information query system designed to access load flow parameters and other electrical system information.

Portante, E.C.; Kavicky, J.A.; VanKuiken, J.C.; Peerenboom, J.P.

1997-10-01T23:59:59.000Z

28

Reliability-Based Load and Resistance Factor Rating Using In-Service Data  

E-Print Network [OSTI]

Reliability-Based Load and Resistance Factor Rating Using In-Service Data Baidurya Bhattacharya, M-dependent maximum live load. An illustrative example uses in-service peak-strain data from ambient traffic collected evaluation techniques are based on design-based deterministic equations that use limited site-specific data

Bhattacharya, Baidurya

29

UPDATE: EFFECTIVE LOAD CARRYING CAPABILITY OF PHOTOVOLTAICS IN THE UNITED STATES  

E-Print Network [OSTI]

. of Lighting Bonneville Power Administration Minnesota Power and Light Portland General Tennesee Valley of a power generator represents its ability to effectively increase the generating capacity available to a utility or a regional power grid without increasing the utility's loss of load risk (Garver, 1966

Perez, Richard R.

30

Simulations of Lithium-Based Neutron Coincidence Counter for Gd-Loaded Fuel  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards and Security (NA-241) is supporting the project Lithium-Based Alternative Neutron Detection Technology Coincidence Counting for Gd-loaded Fuels at Pacific Northwest National Laboratory for the development of a lithium-based neutron coincidence counter for nondestructively assaying Gd loaded nuclear fuel. This report provides results from MCNP simulations of a lithium-based coincidence counter for the possible measurement of Gd-loaded nuclear fuel. A comparison of lithium-based simulations and UNCL-II simulations with and without Gd loaded fuel is provided. A lithium-based model, referred to as PLNS3A-R1, showed strong promise for assaying Gd loaded fuel.

Cowles, Christian C.; Kouzes, Richard T.; Siciliano, Edward R.

2014-10-31T23:59:59.000Z

31

Sample Based Unit Liter Dose Estimates  

SciTech Connect (OSTI)

The Tank Waste Characterization Program has taken many core samples, grab samples, and auger samples from the single-shell and double-shell tanks during the past 10 years. Consequently, the amount of sample data available has increased, both in terms of quantity of sample results and the number of tanks characterized. More and better data is available than when the current radiological and toxicological source terms used in the Basis for Interim Operation (BIO) (FDH 1999) and the Final Safety Analysis Report (FSAR) (FDH 1999) were developed. The Nuclear Safety and Licensing (NS&L) organization wants to use the new data to upgrade the radiological and toxicological source terms used in the BIO and FSAR. The NS and L organization requested assistance in developing a statistically based process for developing the source terms. This report describes the statistical techniques used and the assumptions made to support the development of a new radiological source term for liquid and solid wastes stored in single-shell and double-shell tanks.

JENSEN, L.

1999-07-08T23:59:59.000Z

32

Calculation of bed load based on the measured data of suspended load  

Science Journals Connector (OSTI)

This paper proposes a method for establishing both the velocity profile and concentration profile for suspended sediment based on measured data consisting of average velocity and average suspended ... addition, a...

Chang-Tai Tsai; Chih-Heng Tsai; Chun-Hung Weng…

2010-12-01T23:59:59.000Z

33

Balancing the load: A Voronoi based scheme for parallel computations  

E-Print Network [OSTI]

The use of numerical simulations in science is ever increasing and with it the computational size. In many cases single processors are no longer adequate and simulations are run on multiple core machines or supercomputers. One of the key issues when running a simulation on multiple CPUs is maintaining a proper load balance throughout the run and minimizing communications between CPUs. We propose a novel method of utilizing a Voronoi diagram to achieve a nearly perfect load balance without the need of any global redistributions of data. As a show case, we implement our method in RICH, a 2D moving mesh hydrodynamical code, but it can be extended trivially to other codes in 2D or 3D. Our tests show that this method is indeed efficient and can be used in a large variety of existing hydrodynamical codes as well as other applications.

Steinberg, Elad; Sari, Re'em; Duffell, Paul

2014-01-01T23:59:59.000Z

34

Regression Models for Demand Reduction based on Cluster Analysis of Load  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regression Models for Demand Reduction based on Cluster Analysis of Load Regression Models for Demand Reduction based on Cluster Analysis of Load Profiles Speaker(s): Nobuyuki Yamaguchi Date: March 26, 2009 - 12:00pm Location: 90-3122 This seminar provides new regression models for demand reduction of Demand Response programs for the purpose of ex ante evaluation of the programs and screening for recruiting customer enrollment into the programs. The proposed regression models employ load sensitivity to outside air temperature and representative load pattern derived from cluster analysis of customer baseline load as explanatory variables. We examined the performance of the proposed models with respect to the validity of explanatory variables and fitness of regressions, using actual load profile data of Pacific Gas and Electric Company's commercial and industrial

35

Unit I-3 Linear Independence & Bases 1 Linear independence & bases  

E-Print Network [OSTI]

} ­ so we can write u1 = c2u2 + c3u3 + ... + crur with not all ci = 0 ­ re-arranging gives a non-zero lc u1 - c2u2 - c3u3 - ... - crur = 0 so the vectors are linearly dependent ! Unit I-3 Linear

Birkett, Stephen

36

Transistor-based filter for inhibiting load noise from entering a power supply  

DOE Patents [OSTI]

A transistor-based filter for inhibiting load noise from entering a power supply is disclosed. The filter includes a first transistor having an emitter coupled to a power supply, a collector coupled to a load, and a base. The filter also includes a first capacitor coupled between the base of the first transistor and a ground terminal. The filter further includes an impedance coupled between the base and a node between the collector and the load, or a second transistor and second capacitor. The impedance can be a resistor or an inductor.

Taubman, Matthew S

2013-07-02T23:59:59.000Z

37

Proper Orthogonal Decomposition-Based Modeling, Analysis, and Simulation of Dynamic Wind Load  

E-Print Network [OSTI]

Proper Orthogonal Decomposition-Based Modeling, Analysis, and Simulation of Dynamic Wind Load.1061/ ASCE 0733-9399 2005 131:4 325 CE Database subject headings: Simulation; Wind loads; Buildings; Random on the decomposition of the covariance and XPSD matrices is presented. A physically meaningful linkage between the wind

Chen, Xinzhong

38

Mitigation of Fatigue Loads Using Individual Pitch Control of Wind Turbines Based on FAST  

E-Print Network [OSTI]

Mitigation of Fatigue Loads Using Individual Pitch Control of Wind Turbines Based on FAST Yunqian University, China jiz@seu.edu.cn Abstract-With the increase of wind turbine dimension and capacity, the wind turbine structures are subjected to prominent loads and fatigue which would reduce the lifetime of wind

Chen, Zhe

39

DSP-based fuzzy load controller for single phase self-excited induction generator  

Science Journals Connector (OSTI)

This paper presents the design and implementation of a fuzzy logic-based load controller to regulate the voltage and frequency of single phase self-excited induction generator (SEIG), suitable for standalone operation. The SEIG can be used to generate constant voltage and frequency if the load is maintained constant at its terminals. Moreover, under such operation, SEIG requires constant capacitance for excitation resulting in a fixed-point operation. For this purpose, a suitable control scheme is to be developed such that the load on the SEIG remains constant despite the change in the consumer load. A DSP-based fuzzy load controller has been developed based on equal time ratio control (ETRC) AC chopper controllable load which gives non-linear control with fast response and injects minimum harmonics in the system. The transient behaviour of DSP-based SEIG-fuzzy load controller system at different operating conditions such as application and removal of static (resistive and reactive) load is investigated.

D.K. Palwalia

2011-01-01T23:59:59.000Z

40

A Comparison of Wind Turbine Load Statistics for Inflow Turbulence Fields based on Conventional  

E-Print Network [OSTI]

A Comparison of Wind Turbine Load Statistics for Inflow Turbulence Fields based on Conventional for a utility-scale 5MW wind turbine. Load statistics, spectra, and time-frequency analysis representations utility-scale wind turbines. The present study takes on this question by making use of conventional

Manuel, Lance

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Fuzzy rule-based methodology for residential load behaviour forecasting during power systems restoration  

Science Journals Connector (OSTI)

Inadequate load pickup during power system restoration can lead to overload and underfrequency conditions, and even restart the blackout process, due to thermal energy losses. Thus, load behaviour estimation during restoration is desirable to avoid inadequate pickups. This work describes an artificial intelligence method to aid the operator in taking decisions during system restoration by estimating residential load behaviour parameters such as overload in buses and the necessary time to recover steady-state power consumption. This method uses a fuzzy rule-based system to forecast the residential load, obtaining correct estimates with low computational cost. Test results using actual substation data are presented.

Lia Toledo Moreira Mota; Alexandre Assis Mota; Andre Luiz Morelato Franca

2005-01-01T23:59:59.000Z

42

CFD-based design load analysis of 5MW offshore wind turbine  

Science Journals Connector (OSTI)

The structure and aerodynamic loads acting on NREL 5MW reference wind turbine blade are calculated and analyzed based on advanced Computational Fluid Dynamics (CFD) and unsteady Blade Element Momentum (BEM). A detailed examination of the six force components has been carried out (three force components and three moment components). Structure load (gravity and inertia load) and aerodynamic load have been obtained by additional structural calculations (CFD or BEM respectively ). In CFD method the Reynolds Average Navier-Stokes approach was applied to solve the continuity equation of mass conservation and momentum balance so that the complex flow around wind turbines was modeled. Written in C programming language a User Defined Function (UDF) code which defines transient velocity profile according to the Extreme Operating Gust condition was compiled into commercial FLUENT package. Furthermore the unsteady BEM with 3D stall model has also adopted to investigate load components on wind turbine rotor. The present study introduces a comparison between advanced CFD and unsteady BEM for determining load on wind turbine rotor. Results indicate that there are good agreements between both present methods. It is importantly shown that six load components on wind turbine rotor is significant effect under Extreme Operating Gust (EOG) condition. Using advanced CFD and additional structural calculations this study has succeeded to construct accuracy numerical methodology to estimate total load of wind turbine that compose of aerodynamic load and structure load.

T. T. Tran; G. J. Ryu; Y. H. Kim; D. H. Kim

2012-01-01T23:59:59.000Z

43

BUILDING A UNITED STATES DATA BASE: POPULATIONS AT RISK TO ENVIRONMENTAL POLLUTION  

E-Print Network [OSTI]

BUILDING A UNITED STATES DATA BASE: POPULATIONS AT RISK TO ENVIRONMENTAL POLLUTIONBUILDING A UNITED STATES DATA BASE: POPULATIONS AT RISK TO ENVIRONMENTAL POLLUTION

Sacks, Susan T.

2014-01-01T23:59:59.000Z

44

A Hierarchical Replica Location Approach Based on Cache Mechanism and Load Balancing in Data Grid  

Science Journals Connector (OSTI)

According to data grid characteristics and data-sharing characteristics in distributed environments, we present...RepliLoc..., a hierarchical replica location approach based on Cache mechanism and load balancing....

Baoyan Song; Yanying Mao; Yan Wang; Derong Shen

2008-01-01T23:59:59.000Z

45

A New Neuro-Based Method for Short Term Load Forecasting of Iran National Power System  

Science Journals Connector (OSTI)

This paper presents a new neuro-based method for short term load forecasting of Iran national power system (INPS). A MultiLayer Perceptron ( ... were selected through a peer investigation on historical data relea...

R. Barzamini; M. B. Menhaj; Sh. Kamalvand…

2005-01-01T23:59:59.000Z

46

Thermal Load based Adaptive Tracking for Flat Plate Solar Collectors  

Science Journals Connector (OSTI)

Abstract The energy output of solar-thermal systems using flat plate collectors can be improved by tracking. Tracking is well known as a path for increasing the amount of solar radiation received by the collector; additionally the paper proposes a new concept that considers the inverse tracking as a viable option for protecting the collectors against overheating. An analysis of the thermal energy output and conversion efficiency is done considering forward tracking in three different days with different radiation profile (cloudy, sunny and mixed days), followed by an analysis of the inverse tracking concept. The in-field data show that there is a limiting angle below which inverse tracking is not effective and this value is estimated at 40° as compared with the optimal orientation. A logical scheme is proposed based on four different programs for forward tracking, inverse tracking, maximum inverse tracking or fixing the collector; this decisional scheme covers a broad range of functional situations having as central concept the production of thermal energy only when needed, for satisfying the demand, decreasing the energy consumption for forced circulation and supporting the systems reliability and safety.

Mircea Neagoe; Ion Visa; Bogdan G. Burduhos; Macedon D. Moldovan

2014-01-01T23:59:59.000Z

47

EHD-based load controllers for \\{R134a\\} convective boiling heat exchangers  

Science Journals Connector (OSTI)

Abstract The objective of this study is to investigate the application of high voltage DC waveforms as a mechanism of load control for convective boiling systems. Electrohydrodynamics (EHD) induces flow pattern redistribution, which directly influences the system performance. EHD can provide a low power (<1 W), fast responding method of enhancing two phase flow systems such as heat exchangers. This study compares the use of EHD for load control with control via changing the refrigerant side flow rate in terms of required power, response time and effect on flow parameters. It was found that EHD responds faster and requires less power when a constant exit condition is required for the heat exchanger. Two EHD based controllers; PI controller and a Smith predictor were established using LabVIEW and compared in terms of their response time and regulation behaviour subject to dynamic loading. The Smith predictor resulted in less overshoot and approximately a 50% reduction in settling time in response to dynamic loading. It has been shown that this EHD based controller can regulate subject to ±25% deviation in load from the designed steady state load condition.

S. Nangle-Smith; J.S. Cotton

2014-01-01T23:59:59.000Z

48

An adaptive load dispatching and forecasting strategy for a virtual power plant including renewable energy conversion units  

Science Journals Connector (OSTI)

Abstract The increasing awareness on the risky state of conventional energy sources in terms of future energy supply security and health of environment has promoted the research activities on alternative energy systems. However, due to the fact that the power production of main alternative sources such as wind and solar is directly related with meteorological conditions, these sources should be combined with dispatchable energy sources in a hybrid combination in order to ensure security of demand supply. In this study, the evaluation of such a hybrid system consisting of wind, solar, hydrogen and thermal power systems in the concept of virtual power plant strategy is realized. An economic operation-based load dispatching strategy that can interactively adapt to the real measured wind and solar power production values is proposed. The adaptation of the load dispatching algorithm is provided by the update mechanism employed in the meteorological condition forecasting algorithms provided by the combination of Empirical Mode Decomposition, Cascade-Forward Neural Network and Linear Model through a fusion strategy. Thus, the effects of the stochastic nature of solar and wind energy systems are better overcome in order to participate in the electricity market with higher benefits.

A. Tascikaraoglu; O. Erdinc; M. Uzunoglu; A. Karakas

2014-01-01T23:59:59.000Z

49

A Stator-Voltage Decoupling Control Strategy for DFIG-based Wind Power Turbine Supplying Local Isolated Load  

Science Journals Connector (OSTI)

The performance of doubly fed induction generator (DFIG) based wind turbines supplying local isolated load is manly up to the stator-voltage control strategy. Compared with conventional steady mathematic model based one, a dynamic mathematic model based ... Keywords: dynamic model, supplying local isolated load, decoupling stator-voltage control, DFIG-based wind turbine

Long Zhan; Shuying Yang; Hui Gao

2012-10-01T23:59:59.000Z

50

Reliability updating and prediction of bridge structures based on proof loads and monitored data  

Science Journals Connector (OSTI)

Abstract Bridge deterioration with time and ever increasing traffic loads raise concerns about reliability of aging bridges. One of the ways to predict reliability of aging bridges is to build reasonable resistance prediction model and load effect prediction model. In this paper, to obtain the predicted resistance, by the truncated method or Bayesian method, the initial resistance probability model is updated with the structural proof loads which are greatly less than the resistance of a bridge, reduce uncertainty in the bridge resistance and so increase the bridge reliability; to predict the time-variant load effects which is treated as a time series, the Bayesian dynamic models (BDMs) are introduced and adopted to predict the structural load effects based on the monitored data (everyday monitored extreme stresses). Finally, with the predicted resistance and load effects, the structural reliability indices are solved and predicted with First Order Second Moment method (FOSM), and three numerical examples are provided to illustrate the feasibility and application of the built prediction model in this paper.

Liu Yuefei; Lu Dagang; Fan Xueping

2014-01-01T23:59:59.000Z

51

Control-Based Load Shedding in Data Stream Management Systems Yi-Cheng Tu and Sunil Prabhakar  

E-Print Network [OSTI]

Control-Based Load Shedding in Data Stream Management Systems Yi-Cheng Tu and Sunil Prabhakar system overloading [6, 1]. The idea is to decrease the input load by discarding data tuples from cases of load arrivals. Example 1. As a very typical situation in streams, the incoming data rate may

Tu, Yicheng

52

A multi-agent platform for auction-based allocation of loads in transportation logistics  

Science Journals Connector (OSTI)

This paper describes an agent-based platform for the allocation of loads in distributed transportation logistics, developed as a collaboration between CWI, Dutch National Center for Mathematics and Computer Science, Amsterdam and Vos Logistics Organizing, ... Keywords: Auction platforms, Human-computer interaction, Multi-agent systems, Software platform, Supply chain management, Transportation logistics

Valentin Robu; Han Noot; Han La Poutré; Willem-Jan van Schijndel

2011-04-01T23:59:59.000Z

53

Bus HVAC energy consumption test method based on HVAC unit behavior  

Science Journals Connector (OSTI)

This paper presents a test method for determination of energy consumption of bus HVAC unit. The energy consumption corresponds to a bus engine fuel consumption increase during the HVAC unit operation period. The HVAC unit energy consumption is determined from the unit input power, which is measured under several levels of bus engine speeds and at different levels of testing heat load in the laboratory environment. Since the bus engine fuel consumption is incrementally induced by powering an HVAC unit, the results are subsequently recalculated to the unit fuel consumption under the defined road cycles in terms of standardized diesel engine. The method is likewise applicable either for classic or electric HVAC units with a main consumer (compressor or high voltage alternator) mechanically driven directly from the bus engine and also for electric HVAC units supplied from an alternative electric energy source in case of hybrid or fully electric buses.

M. Hegar; M. Kolda; M. Kopecka; V. Rajtmajer; A. Ryska

2013-01-01T23:59:59.000Z

54

Three-dimensional isotropic perfect lens based on LC-loaded transmission lines  

E-Print Network [OSTI]

An isotropic three-dimentional perfect lens based on cubic meshes of interconnected transmission lines and bulk loads is proposed. The lens is formed by a slab of a loaded mesh placed in between two similar unloaded meshes. The dispersion equations and the characteristic impedances of the eigenwaves in the meshes are derived analytically, with an emphasis on generality. This allows designing of transmission-line meshes with desired dispersion properties. The required backward-wave mode of operation in the lens is realized with simple inductive and capacitive loads. An analytical expression for the transmission through the lens is derived and the amplification of evanescent waves is demonstrated. Factors that influence enhancement of evanescent waves in the lens are studied and the corresponding design criteria are established. A possible realization of the structure is outlined.

P. Alitalo; S. Maslovski; S. Tretyakov

2005-09-16T23:59:59.000Z

55

Revisiting flow-based load balancing: Stateless path selection in data center networks  

Science Journals Connector (OSTI)

Hash-based load-balancing techniques are widely used to distribute the load over multiple forwarding paths and preserve the packet sequence of transport-level flows. Forcing a long-lived, i.e., elephant, flow to follow a specific path in the network is a desired mechanism in data center networks to avoid crossing hot spots. This limits the formation of bottlenecks and so improves the network use. Unfortunately, current per-flow load-balancing methods do not allow sources to deterministically force a specific path for a flow. In this paper, we propose a deterministic approach enabling end hosts to steer their flows over any desired load-balanced path without relying on any packet header extension. By using an invertible mechanism instead of solely relying on a hash function in routers, our method allows to easily select the packet’s header field values in order to force the selection of a given load-balanced path without storing any state in routers. We perform various simulations and experiments to evaluate the performance and prove the feasibility of our method using a Linux kernel implementation. Furthermore, we demonstrate with simulations and lab experiments how MultiPath TCP can benefit from the combination of our solution with a flow scheduling system that efficiently distributes elephant flows in large data center networks.

Gregory Detal; Christoph Paasch; Simon van der Linden; Pascal Mérindol; Gildas Avoine; Olivier Bonaventure

2013-01-01T23:59:59.000Z

56

Loading and Regeneration Analysis of a Diesel Particulate Filter with a Radio Frequency-Based Sensor  

SciTech Connect (OSTI)

Accurate knowledge of diesel particulate filter (DPF) loading is critical for robust and efficient operation of the combined engine-exhaust aftertreatment system. Furthermore, upcoming on-board diagnostics regulations require on-board technologies to evaluate the status of the DPF. This work describes the application of radio frequency (RF) based sensing techniques to accurately measure DPF soot levels and the spatial distribution of the accumulated material. A 1.9L GM turbo diesel engine and a DPF with an RF-sensor were studied. Direct comparisons between the RF measurement and conventional pressure-based methods were made. Further analysis of the particulate matter loading rates was obtained with a mass-based soot emission measurement instrument (TEOM). Comparison with pressure drop measurements show the RF technique is unaffected by exhaust flow variations and exhibits a high degree of sensitivity to DPF soot loading and good dynamic response. Additional computational and experimental work further illustrates the spatial resolution of the RF measurements. Based on the experimental results, the RF technique shows significant promise for improving DPF control enabling optimization of the combined engine-aftertreatment system for improved fuel economy and extended DPF service life.

Sappok, Alex [Filter Sensing Technologies] [Filter Sensing Technologies; Prikhodko, Vitaly Y [ORNL] [ORNL; Parks, II, James E [ORNL

2010-01-01T23:59:59.000Z

57

A Load-based Micro-indentation Technique for Mechanical Property and NDE Evaluation  

SciTech Connect (OSTI)

A load-based micro-indentation technique has been developed for evaluating mechanical properties of materials. Instead of using measured indentation depth or contact area as a necessary parameter, the new technique is based on the indentation load, coupled with a multiple-partial unloading procedure for mechanical property evaluation. The proposed load-based micro-indentation method is capable of determining Young’s modulus of metals, superalloys, and single crystal matrices, and stiffness of coated material systems with flat, tubular, or curved architectures. This micro-indentation technique can be viewed as a viable non-destructive evaluation (NDE) technique for determining as-manufactured and process-exposed metal, superalloy, single crystal, and TBC-coated material properties. Based on this technique, several bond coated substrates were tested at various stages of thermal cycles. The time-series evaluation of test material surface stiffness reveals the status of coating strength without any alternation of the coating surface, making it a true time-series NDE investigation. The microindentation test results show good correlation with post mortem microstructural analyses. This technique also shows promise for the development of a portable instrument for on-line, in-situ NDE and mechanical properties measurement of structural components.

Bruce S. Kang; Chuanyu Feng; Jared M. Tannenbaum; M.A. Alvin

2009-06-04T23:59:59.000Z

58

The Impact of a Metacognitive Reflection Component in a Problem-Based Learning Unit  

E-Print Network [OSTI]

This mixed methods dissertation explores the impact of metacognitive support (reflective journal entries and a think-aloud exercise) in a PBL (problem-based learning) unit. While students are developing a solution for a PBL unit they may become...

Seifert, Kathryn A.

2010-01-16T23:59:59.000Z

59

Aft-body loading function for penetrators based on the spherical cavity-expansion approximation.  

SciTech Connect (OSTI)

In this paper we develop an aft-body loading function for penetration simulations that is based on the spherical cavity-expansion approximation. This loading function assumes that there is a preexisting cavity of radius a{sub o} before the expansion occurs. This causes the radial stress on the cavity surface to be less than what is obtained if the cavity is opened from a zero initial radius. This in turn causes less resistance on the aft body as it penetrates the target which allows for greater rotation of the penetrator. Results from simulations are compared with experimental results for oblique penetration into a concrete target with an unconfined compressive strength of 23 MPa.

Longcope, Donald B., Jr.; Warren, Thomas Lynn; Duong, Henry

2009-12-01T23:59:59.000Z

60

On Assessing the Accuracy of Offshore Wind Turbine Reliability-Based Design Loads from the Environmental Contour Method  

E-Print Network [OSTI]

On Assessing the Accuracy of Offshore Wind Turbine Reliability-Based Design Loads from to derive design loads for an active stall-regulated offshore wind turbine. Two different Danish offshore contour method; wind turbine; offshore; reliability. INTRODUCTION Inverse reliability techniques

Manuel, Lance

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Heavy-Duty Diesel Vehicle Fuel Consumption Modeling Based on Road Load and Power Train Parameters  

E-Print Network [OSTI]

Injection Diesel Engine Fuel Consumption”, SAE 971142, 11.engine load, engine speed, and fuel consumption. The tirevehicle speed, engine speed, fuel consumption, engine load,

Giannelli, R; Nam, E K; Helmer, K; Younglove, T; Scora, G; Barth, M

2005-01-01T23:59:59.000Z

62

Tool-Assisted Unit-Test Generation and Selection Based on Operational Abstractions  

E-Print Network [OSTI]

Tool-Assisted Unit-Test Generation and Selection Based on Operational Abstractions Tao Xie1 of Washington, Seattle, WA 98105 Abstract. Unit testing, a common step in software development, presents a chal- lenge. When produced manually, unit test suites are often insufficient to identify defects. The main

Xie, Tao

63

Commercial and Residential Hourly Load Data Now Available on OpenEI! |  

Open Energy Info (EERE)

Commercial and Residential Hourly Load Data Now Available on OpenEI! Commercial and Residential Hourly Load Data Now Available on OpenEI! Home > Groups > Utility Rate Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL I am pleased to announce that simulated hourly residential and commercial building load datasets are now available on OpenEI. These datasets are available for all TMY3 locations in the United States. They contain hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). In addition to various

64

load profile | OpenEI Community  

Open Energy Info (EERE)

data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

65

A hardware-based approach to adaptive load-sharing on a local area network  

E-Print Network [OSTI]

Load-distribution is used to enhance the performance of distributed systems. Two types of load-distribution techniques have been studied and used: load-sharing schemes, in which the total load on the system is distributed in such a way...

Reddy, Harikrishna M

1994-01-01T23:59:59.000Z

66

Life cycle assessment of base-load heat sources for district heating system options  

SciTech Connect (OSTI)

Purpose There has been an increased interest in utilizing renewable energy sources in district heating systems. District heating systems are centralized systems that provide heat for residential and commercial buildings in a community. While various renewable and conventional energy sources can be used in such systems, many stakeholders are interested in choosing the feasible option with the least environmental impacts. This paper evaluates and compares environmental burdens of alternative energy source options for the base load of a district heating center in Vancouver, British Columbia (BC) using the life cycle assessment method. The considered energy sources include natural gas, wood pellet, sewer heat, and ground heat. Methods The life cycle stages considered in the LCA model cover all stages from fuel production, fuel transmission/transportation, construction, operation, and finally demolition of the district heating system. The impact categories were analyzed based on the IMPACT 2002+ method. Results and discussion On a life-cycle basis, the global warming effect of renewable energy options were at least 200 kgeqCO2 less than that of the natural gas option per MWh of heat produced by the base load system. It was concluded that less than 25% of the upstream global warming impact associated with the wood pellet energy source option was due to transportation activities and about 50% of that was resulted from wood pellet production processes. In comparison with other energy options, the wood pellets option has higher impacts on respiratory of inorganics, terrestrial ecotoxicity, acidification, and nutrification categories. Among renewable options, the global warming impact of heat pump options in the studied case in Vancouver, BC, were lower than the wood pellet option due to BC's low carbon electricity generation profile. Ozone layer depletion and mineral extraction were the highest for the heat pump options due to extensive construction required for these options. Conclusions Natural gas utilization as the primary heat source for district heat production implies environmental complications beyond just the global warming impacts. Diffusing renewable energy sources for generating the base load district heat would reduce human toxicity, ecosystem quality degradation, global warming, and resource depletion compared to the case of natural gas. Reducing fossil fuel dependency in various stages of wood pellet production can remarkably reduce the upstream global warming impact of using wood pellets for district heat generation.

Ghafghazi, Saeed [University of British Columbia, Vancouver; Sowlati, T. [University of British Columbia, Vancouver; Sokhansanj, Shahabaddine [ORNL; Melin, Staffan [Delta Research Corporation

2011-03-01T23:59:59.000Z

67

Research of least squares support vector regression based on differential evolution algorithm in short-term load forecasting model  

Science Journals Connector (OSTI)

To improve the accuracy of short-term load forecasting a differential evolution algorithm (DE) based least squares support vector regression (LSSVR) method is proposed in this paper. Through optimizing the regularization parameter and kernel parameter of the LSSVR by DE a short-term load forecasting model which can take load affected factors such as meteorology weather and date types into account is built. The proposed LSSVR method is proved by implementing short-term load forecasting on the real historical data of Yangquan power system in China. The average forecasting error is less than 1.6% which shows better accuracy and stability than the traditional LSSVR and Support vector regression. The result of implementation of short-term load forecasting demonstrates that the hybrid model can be used in the short-term forecasting of the power system more efficiently.

2014-01-01T23:59:59.000Z

68

The Dynamic Character Curve Adjusting Model of Electric Load Based on Data Mining Theory  

Science Journals Connector (OSTI)

There are a number of dirty data in the load database produced by SCADA system. Consequently, the data must be adjusted carefully and reasonably before being used for electric load forecasting or power system ana...

Xiaoxing Zhang; Haijun Ren; Yuming Liu…

2005-01-01T23:59:59.000Z

69

ControlBased Load Shedding in Data Stream Management Systems YiCheng Tu and Sunil Prabhakar  

E-Print Network [OSTI]

Control­Based Load Shedding in Data Stream Management Systems Yi­Cheng Tu and Sunil Prabhakar}@cs.purdue.edu Abstract Load shedding has been widely used in data stream man­ agement systems (DSMSs) as a means to maintain Quality­ of­Service (QoS) of data processing. However, current sys­ tems tend to adapt ad hoc

Tu, Yicheng

70

Structural Safety and Reliability, Corotis et al. (eds), 2001 Swets & Zeitlinger, ISBN 90 5809 197 X Moment-based fatigue load models for wind energy systems  

E-Print Network [OSTI]

197 X 1 Moment-based fatigue load models for wind energy systems Steven R. Winterstein & LeRoy M. Veers Sandia National Laboratories, Wind Energy Technology Department, Albuquerque, NM 87185-0708 Keywords: load models, fatigue loads, wind energy, non-Gaussian, moment-based models, long- term, short

Manuel, Lance

71

Load Control  

Broader source: Energy.gov (indexed) [DOE]

Visualization and Controls Peer Review Visualization and Controls Peer Review Load Control for System Reliability and Measurement-Based Stability Assessment Dan Trudnowski, PhD, PE Montana Tech Butte, MT 59701 dtrudnowski@mtech.edu 406-496-4681 October 2006 2 Presentation Outline * Introduction - Goals, Enabling technologies, Overview * Load Control - Activities, Status * Stability Assessment - Activities, Status * Wrap up - Related activities, Staff 3 Goals * Research and develop technologies to improve T&D reliability * Technologies - Real-time load control methodologies - Measurement-based stability-assessment 4 Enabling Technologies * Load control enabled by GridWise technology (e.g. PNNL's GridFriendly appliance) * Real-time stability assessment enabled by Phasor Measurement (PMU) technology 5 Project Overview * Time line: April 18, 2006 thru April 17, 2008

72

PERCEPTUALLY BASED AUTOMATIC PROSODY LABELING AND PROSODICALLY ENRICHED UNIT SELECTION IMPROVE  

E-Print Network [OSTI]

inventory and in prosodically enriched unit selection. A formal listening test was conducted to com­ parePERCEPTUALLY BASED AUTOMATIC PROSODY LABELING AND PROSODICALLY ENRICHED UNIT SELECTION IMPROVE the process of prosodically la­ beling our TTS inventory. However, reliability among label­ ers for some To

Greenberg, Albert

73

Systems and methods for providing power to a load based upon a control strategy  

SciTech Connect (OSTI)

Systems and methods are provided for an electrical system. The electrical system, for example, includes a first load, an interface configured to receive a voltage from a voltage source, and a controller configured to receive the voltage through the interface and to provide a voltage and current to the first load. The controller may be further configured to, receive information on a second load electrically connected to the voltage source, determine an amount of reactive current to return to the voltage source such that a current drawn by the electrical system and the second load from the voltage source is substantially real, and provide the determined reactive current to the voltage source.

Perisic, Milun; Lawrence, Christopher P; Ransom, Ray M; Kajouke, Lateef A

2014-11-04T23:59:59.000Z

74

A Stator-Voltage Decoupling Control Strategy for No-Load Cutting-in Process of DFIG-based Wind Power Turbines  

Science Journals Connector (OSTI)

The performance of no-load cutting-in process is manly up to the stator-voltage control strategy for doubly fed induction generator (DFIG) based wind turbines. Compared with conventional steady mathematic model based one, a dynamic mathematic model based ... Keywords: dynamic model, no-load cutting-in process decoupling stator-voltage control, DFIG-based wind turbine

Shuying Yang; Long Zhan; Xing Zhang

2012-07-01T23:59:59.000Z

75

FLOCKING-BASED DOCUMENT CLUSTERING ON THE GRAPHICS PROCESSING UNIT  

SciTech Connect (OSTI)

Analyzing and grouping documents by content is a complex problem. One explored method of solving this problem borrows from nature, imitating the fl ocking behavior of birds. Each bird represents a single document and fl ies toward other documents that are similar to it. One limitation of this method of document clustering is its complexity O(n2). As the number of documents grows, it becomes increasingly diffi cult to receive results in a reasonable amount of time. However, fl ocking behavior, along with most naturally inspired algorithms such as ant colony optimization and particle swarm optimization, are highly parallel and have experienced improved performance on expensive cluster computers. In the last few years, the graphics processing unit (GPU) has received attention for its ability to solve highly-parallel and semi-parallel problems much faster than the traditional sequential processor. Some applications see a huge increase in performance on this new platform. The cost of these high-performance devices is also marginal when compared with the price of cluster machines. In this paper, we have conducted research to exploit this architecture and apply its strengths to the document flocking problem. Our results highlight the potential benefi t the GPU brings to all naturally inspired algorithms. Using the CUDA platform from NVIDIA®, we developed a document fl ocking implementation to be run on the NVIDIA® GEFORCE 8800. Additionally, we developed a similar but sequential implementation of the same algorithm to be run on a desktop CPU. We tested the performance of each on groups of news articles ranging in size from 200 to 3,000 documents. The results of these tests were very signifi cant. Performance gains ranged from three to nearly fi ve times improvement of the GPU over the CPU implementation. This dramatic improvement in runtime makes the GPU a potentially revolutionary platform for document clustering algorithms.

Charles, J.S.; Patton, R.M.; Potok, T.E.; Cui, X.

2008-01-01T23:59:59.000Z

76

Abstract--We consider the management of electric vehicle (EV) loads within a market-based Electric Power System  

E-Print Network [OSTI]

battery charging while engaging in energy and reserve capacity transactions in the wholesale power market day-ahead and real-time power market framework similar to that used in the major USA power pools (PJMAbstract--We consider the management of electric vehicle (EV) loads within a market-based Electric

Caramanis, Michael

77

Experimental Study on Geocell-Reinforced Flexible Pavements with Recycled Asphalt Pavement (RAP) Bases under Cyclic Loading  

E-Print Network [OSTI]

in the geotechnical testing box and tested under cyclic loading. The subgrade was composed of a mixture of 75% Kansas river sand and 25% Kaolin at 10.4% optimum moisture content, which corresponds to 5% CBR. The RAP base was constructed without or with geocell at 6.6...

Acharya, Bhagaban

2011-12-31T23:59:59.000Z

78

Optimization of support vector machine power load forecasting model based on data mining and Lyapunov exponents  

Science Journals Connector (OSTI)

According to the chaotic and non-linear characters of power load data, the time series matrix is established with ... dimension. Due to different features of the data, data mining algorithm is conducted to classi...

Dong-xiao Niu ???; Yong-li Wang ???…

2010-04-01T23:59:59.000Z

79

A Research on Power Load Forecasting Model Based on Data Mining  

Science Journals Connector (OSTI)

Utilizing the advantage of data mining technology in processing large data and eliminating redundant information, the system mines the historical daily loading which has the same meteorological category as the fo...

Fuyu Sun; Yunshi Yang

2008-01-01T23:59:59.000Z

80

Calculation of limiting horizontal load on piles-columns based on cone-penetration data  

Science Journals Connector (OSTI)

Results of field tests confirming the correlation relation between the limiting load on a pile-column and the specific resistance of the soil beneath the cone of the probe are presented. A formula is proposed ...

B. V. Goncharov; O. V. Galimnurova…

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Dynamic Shape Modeling of Consumers’ Daily Load Based on Data Mining  

Science Journals Connector (OSTI)

The shape characteristic of daily power consumption of consumers can be applied to guide their power consumption behaviors and improve load structures of power system. It is also the basis to obtain the shape cha...

Lianmei Zhang; Shihong Chen; Qiping Hu

2005-01-01T23:59:59.000Z

82

Micro-grid operation of inverter based distributed generation with voltage and frequency dependent loads  

E-Print Network [OSTI]

Distribution systems are experiencing increasing penetration of distributed generation (DG). One attractive option is to use the available DG capacity during utility outages by forming planned micro-grids. Load sharing ...

Zeineldin, H. H.

83

A STATCOM based voltage regulator for parallel operated isolated asynchronous generators feeding three-phase four-wire loads  

Science Journals Connector (OSTI)

This paper presents an investigation on a voltage regulator for parallel operated isolated asynchronous generators (IAGs) supplying three-phase four-wire loads driven by constant speed prime mover like diesel engine, bio-mass, gasoline, etc. The proposed voltage regulator is realised using a static compensator (STATCOM) for providing the reactive power compensation, harmonic elimination and load balancing. Three single-phase insulated gate bipolar transistors (IGBTs) based VSCs along-with three single-phase transformers and self-supporting DC bus are used as a voltage controller for supplying three-phase four-wire loads. The neutral point of the load is achieved using the neutral point of the excitation capacitors and primary windings terminal of the transformers. The proposed isolated electrical generating system is modelled and simulated on MATLAB using Simulink and power system blockset (PSB) toolboxes. The performance of the proposed voltage controller for IAGs is demonstrated while feeding linear and non-linear balanced and unbalanced loads.

Gaurav Kumar Kasal; Bhim Singh

2009-01-01T23:59:59.000Z

84

A New Cyclostationarity-Based Blind Approach for Motor Unit's Firing Rate Automated Detection in Electromyographic Signals  

E-Print Network [OSTI]

of these electric fields provides a specific waveform called Motor Unit Action Potential (MUAP). This fullA New Cyclostationarity-Based Blind Approach for Motor Unit's Firing Rate Automated Detection that aims at detecting the firing rates of the activated motor units. The proposed method is based

Paris-Sud XI, Université de

85

A Graph-based Approach for Contextual Service Loading in Pervasive Environments  

E-Print Network [OSTI]

the loaded ones. We introduce the AxSeL architecture, a conteXtual Service Loader that en- ables the service-oriented and applications. In this paper, we consider the adaptive deployment as a mainstream solution to suit service-oriented constraints. We introduce the AxSeL architecture, A conteX- tual Service Loader in which services

Paris-Sud XI, Université de

86

Optimal joint utility based load balancing algorithm for heterogeneous wireless networks  

Science Journals Connector (OSTI)

The rapid development of mobile broadband services with continuously increasing traffic volumes has resulted in a number of challenges, including ubiquitous network coverage, high bandwidth, and reliable services for reasonable price, etc. To address ... Keywords: EPS, Heterogeneous network, Joint utility, Load balancing, Optimization

Rong Chai, Huili Zhang, Xiaoyu Dong, Qianbin Chen, Tommy Svensson

2014-08-01T23:59:59.000Z

87

Model-based engineering of user interfaces to support cognitive load estimation in automotive  

E-Print Network [OSTI]

of the UI and for computing graph-theoretic metrics that could bear upon cognitive load. Categories user interfaces; D.2.8 [Software Engineering]: Metrics-- complexity measures, performance measures; D.2 with high traffic density, or bad weather, or when driving in unknown areas. Even with such adaptive

Brajnik, Giorgio

88

MPC-Based Load Shedding for Voltage Stability Enhancement I.A. Hiskens B. Gong  

E-Print Network [OSTI]

of the North American power system in August 2003 could have been avoided by tripping a relatively small amount in communications and computer systems facilitate such non-disruptive load control. The paper is organized respectively. Section IV develops a linear time-varying discrete-time model of power system dynamics

Hiskens, Ian A.

89

A new short-term load forecast method based on neuro-evolutionary algorithm and chaotic feature selection  

Science Journals Connector (OSTI)

Abstract In competitive environment of deregulated electricity market, short-term load forecasting (STLF) is a major discussion for efficient operation of power systems. Therefore, the area of electricity load forecasting is still essential need for more accurate and stable load forecast algorithm. However, the electricity load is a non-linear signal with high degree of volatility. In this paper, a new forecasted method based on neural network (NN) and chaotic intelligent feature selection is presented. The proposed feature selection method selects the best set of candidate input which is used as input data for the forecasted. The theory of phase space reconstruction under Taken’s embedding theorem is used to prepare candidate features. Then, candidate inputs relevance to target value are measured by using correlation analysis. Forecast engine is a multilayer perception layer (MLP) NN with hybrid Levenberg–Marquardt (LM) and Differential Evolutionary (DE) learning algorithm. The proposed STLF is tested on PJM and New England electricity markets and compared with some of recent STLF techniques.

Sajjad Kouhi; Farshid Keynia; Sajad Najafi Ravadanegh

2014-01-01T23:59:59.000Z

90

Geoecology: a county-level environmental data base for the conterminous United States  

SciTech Connect (OSTI)

The Geoecology Data Base represents a unique compilation of computerized environmental data for research and development needs. Environmental assessment and planning for energy development require rapid access to data at appropriate spatial and temporal scales. In the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL), we have developed an integrated data base of diverse environmental resource information from extant sources. Data are stored at the county level of resolution for the conterminous United States with some data available for subcounty units within larger, more diverse eastern counties. The Geoecology Data Base contains selected data on terrain and soils, water resources, forestry, vegetation, agriculture, land use, wildlife, air quality, climate, natural areas, and endangered species. Basic files on human population are also included to complement the environmental files. Data are stored in metric-SI units. The Geoecology Data Base is currently fulfilling diverse ongoing research needs while it is being expanded and updated as needs and new data are identified. This report is both a documentation and a user's guide to the Geoecology Data Base. It describes the Data Base design, illustrates applications, provides examples of accessing the Data Base, and gives general information on the data set contents.

Olson, R.J.; Emerson, C.J.; Nungesser, M.K.

1980-09-01T23:59:59.000Z

91

A Load-based Depth-sensing Indentation Technique for NDE and Life Assessment of Thermal Barrier Coatings  

SciTech Connect (OSTI)

In this paper, we present a load-based micro-indentation technique for evaluating material mechanical properties as well as degradation evaluation and debonding/spallation detection of thermal barrier coating (TBC) materials. Instead of using contact area as a necessary parameter, the new technique is based on the indentation load. Coupled with a multiple-partial unloading procedure during the indentation process, this technique results in a load-depth sensing indentation system capable of determining Young’s modulus of metals, superalloys, and single crystal matrices, and stiffness of coated material systems with flat, tubular, or curved architectures. This micro-indentation technique can be viewed as a viable non-destructive evaluation (NDE) technique for determining as-manufactured and process-exposed metal, superalloy, single crystal, and TBC-coated material properties. This technique also shows promise for the development of a portable instrument for on-line, in-situ NDE and mechanical properties measurement of structural components.

B. S.-J. Kang; C. Feng; J. M. Tannenbaum; M.A. Alvin

2009-06-12T23:59:59.000Z

92

Improvement of load-following capacity based on the flame radiation intensity signal in a power plant  

SciTech Connect (OSTI)

The capability to perform fast load changes has been an important issue due to the increasing commercialization of the power market. In the traditional boiler control system, the feedback signals come from the variations of the steam pressure and the steam flow, which leads to a large time delay. Therefore, a new method for the boiler control system based on radiation intensity for improving the load-following capacity of a coal-fired power plant has been developed in this paper. The system is implemented by adding the radiation intensity of the flame to the existing boiler control system as a complement. The radiation intensity obtained by the sensor can directly reflect the input heat in the boiler, with a faster response and higher sensitivity. Field tests on a 300 MW coal-fired power plant reveal that the improved boiler control system increases the load-following capacity. At the same time, the steam pressure variations are smaller as compared with those of the existing control system. 14 refs., 19 figs., 1 tab.

Fei Wang; Qunxing Huang; Dong Liu; Jianhua Yan; Kefa Cen [Zhejiang University, Hangzhou (China). State Key Laboratory of Clean Energy Utilization

2008-05-15T23:59:59.000Z

93

The Temperature Sensitivity of the Residential Load and Commercial Building Load  

SciTech Connect (OSTI)

This paper presents a building modeling approach to quickly quantify climate change impacts on energy consumption, peak load, and load composition of residential and commercial buildings. This research focuses on addressing the impact of temperature changes on the building heating and cooling load in 10 major cities across the Western United States and Canada. A building simulation software are first used to quantify the hourly energy consumption of different building types by end-use and by vintage. Then, the temperature sensitivities are derived based on the climate data inputs.

Lu, Ning; Taylor, Zachary T.; Jiang, Wei; Correia, James; Leung, Lai R.; Wong, Pak C.

2009-07-26T23:59:59.000Z

94

Using thermal test data to determine the minimum load of a 200-MW power unit with a PK-47 boiler at the Zainsk power station  

Science Journals Connector (OSTI)

Calculations show that to prevent the oscillatory instability of the flow in a PK-47 once-through boiler, it is necessary to install /12 mm orifice plates at the inlet of its bottom radiant section. Load-reduc...

I. I. Belyakov; V. I. Breus; A. B. Barannikov

2013-07-01T23:59:59.000Z

95

Scheduling-Based Load-Balanced Fabric for High-Performance Wavelength-Routing Data Centers  

Science Journals Connector (OSTI)

We propose a novel router architecture based on consolidated WDM recirculation fibers as a solution to the challenge of limited optical buffering capacity. Our design employs a...

Rastegarfar, Houman; Rusch, Leslie A; Leon-Garcia, Alberto

96

Decentralized Optimal Load Scheduling using Extremum Seeking-Based Optimization  

E-Print Network [OSTI]

The concept of demand-side management for electricD. Dietrich, "Demand side management: demand response,A. Garcia, "Autonomous demand-side management based on game-

Ye, Maojiao; Hu, Guoqiang; Spanos, Costas J

2014-01-01T23:59:59.000Z

97

Hydrogen-or-Fossil-Combustion Nuclear Combined-Cycle Systems for Base- and Peak-Load Electricity Production  

SciTech Connect (OSTI)

A combined-cycle power plant is described that uses (1) heat from a high-temperature nuclear reactor to meet base-load electrical demands and (2) heat from the same high-temperature reactor and burning natural gas, jet fuel, or hydrogen to meet peak-load electrical demands. For base-load electricity production, fresh air is compressed; then flows through a heat exchanger, where it is heated to between 700 and 900 C by heat provided by a high-temperature nuclear reactor via an intermediate heat-transport loop; and finally exits through a high-temperature gas turbine to produce electricity. The hot exhaust from the Brayton-cycle gas turbine is then fed to a heat recovery steam generator that provides steam to a steam turbine for added electrical power production. To meet peak electricity demand, the air is first compressed and then heated with the heat from a high-temperature reactor. Natural gas, jet fuel, or hydrogen is then injected into the hot air in a combustion chamber, combusts, and heats the air to 1300 C-the operating conditions for a standard natural-gas-fired combined-cycle plant. The hot gas then flows through a gas turbine and a heat recovery steam generator before being sent to the exhaust stack. The higher temperatures increase the plant efficiency and power output. If hydrogen is used, it can be produced at night using energy from the nuclear reactor and stored until needed. With hydrogen serving as the auxiliary fuel for peak power production, the electricity output to the electric grid can vary from zero (i.e., when hydrogen is being produced) to the maximum peak power while the nuclear reactor operates at constant load. Because nuclear heat raises air temperatures above the auto-ignition temperatures of the various fuels and powers the air compressor, the power output can be varied rapidly (compared with the capabilities of fossil-fired turbines) to meet spinning reserve requirements and stabilize the electric grid. This combined cycle uses the unique characteristics of high-temperature reactors (T>700 C) to produce electricity for premium electric markets whose demands can not be met by other types of nuclear reactors. It may also make the use of nuclear reactors economically feasible in smaller electrical grids, such as those found in many developing countries. The ability to rapidly vary power output can be used to stabilize electric grid performance-a particularly important need in small electrical grids.

Forsberg, Charles W [ORNL; Conklin, Jim [ORNL

2007-09-01T23:59:59.000Z

98

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 UNIT NUMBER UNIT NAME Rubble oile 41 REGULATORY STATUS: AOC LOCATION: Butler Lake Dam, West end of Butler Lake top 20 ft wide, 10 ft APPROXIMATE DIMENSIONS: 200 ft long, base 30...

99

Design of Micro-grid System Based on Renewable Power Generation Units  

E-Print Network [OSTI]

Abstract- Micro-grid system is currently a conceptual solution to fulfill the commitment of reliable power delivery for future power systems. Renewable power sources such as wind and hydro offer the best potential for emission free power for future micro-grid systems. This paper presents a micro-grid system based on wind and hydro power sources and addresses issues related to operation, control, and stability of the system. The micro-grid system investigated in this paper represents a case study in Newfoundland, Canada. It consists of a small hydro generation unit and a wind farm that contains nine variable- speed, double-fed induction generator based wind turbines. Using Matlab/Simulink, the system is modeled and simulated to identify the technical issues involved in the operation of a micro-grid system based on renewable power generation units. The operational modes, technical challenges and a brief outline of conceptual approaches to addressing some of the technical issues are presented for further investigation.

Dr. K. Ravich; M. Manasa; Mr. P. Yohan Babu; G. V. P. Anjaneyulu

100

Research of Least Square Support Vector Machine Based on Chaotic Time Series in Power Load Forecasting Model  

Science Journals Connector (OSTI)

To predict short-term power load in an effective and fast way, the ... are also determined. And then the continuous power load data are transformed into data matrix by using the theory of phase- ... LSSVM is used...

Wei Sun; Chenguang Yang

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Model-Based Testing of Automotive Electronic Control Units Ghmann, Clemens {clemens.guehmann@tu-berlin.de}  

E-Print Network [OSTI]

Model-Based Testing of Automotive Electronic Control Units Gühmann, Clemens {clemens.guehmann@tu-berlin.de} Technische Universität Berlin, Department of Electronic Measurement and Diagnostic Technology Einsteinufer 17 by networking electronic control units (ECUs), and by implementation of the functions distributed throughout

Wichmann, Felix

102

Bamboo saccharification through cellulose solvent-based biomass pretreatment followed by enzymatic hydrolysis at ultra-low cellulase loadings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bamboo Bamboo saccharification through cellulose solvent-based biomass pretreatment followed by enzymatic hydrolysis at ultra-low cellulase loadings Noppadon Sathitsuksanoh a,b , Zhiguang Zhu a , Tsung-Jen Ho c,d , Ming-Der Bai e , Yi-Heng Percival Zhang a,b,f, * a Biological Systems Engineering Department, Virginia Polytechnic Institute and State University (Virginia Tech), 210-A Seitz Hall, Blacksburg, VA 24061, USA b Institute for Critical Technology and Applied Science (ICTAS), Virginia Polytechnic Institute and State University, Blacksburg, VA 24061, USA c Pilot Process and Applications Department of Chemical Engineering Division, Material and Chemical Research Laboratories, Industrial Technology Research Institute, Hsinchu 30011, Taiwan d Department of Chemical and Materials Engineering, National Central University, Chungli 32001, Taiwan e BioFuel Department

103

An Edge-based Formulation for the Combined-Cycle Units  

E-Print Network [OSTI]

Oct 1, 2014 ... Abstract: As the number of combined-cycle units increases, efficient modeling approaches for these units play important roles for Independent ...

Lei Fan

2014-10-01T23:59:59.000Z

104

load data | OpenEI Community  

Open Energy Info (EERE)

51 51 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234851 Varnish cache server load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data

105

A Bench Study of Intensive Care Unit Ventilators: New versus Old and Turbine-Based versus Compressed Gas-Based Ventilators  

E-Print Network [OSTI]

. Material: Four turbine- based ventilators and nine conventional servo-valve compressed-gas ventilators were1 A Bench Study of Intensive Care Unit Ventilators: New versus Old and Turbine-Based versus Compressed Gas-Based Ventilators Arnaud W. Thille,1 MD; Aissam Lyazidi,1 Biomed Eng MS; Jean-Christophe M

Paris-Sud XI, Université de

106

Parallel Cycle Based Logic Simulation using Graphics Processing Units Alper Sen, Baris Aksanli, Murat Bozkurt, and Melih Mert  

E-Print Network [OSTI]

Parallel Cycle Based Logic Simulation using Graphics Processing Units Alper Sen, Baris Aksanli-based parallelization of logic simulation algorithm for electronic designs. Logic simulation is a crucial component attempts to speedup the verification process (and logic simulation) results in great savings and shorter

Sen, Alper

107

Plug Load  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Residential Commercial Commercial Industrial Lighting Energy Smart Grocer Program HVAC Program Shell Measures Commercial Kitchen & Food Service Equipment Plug Load New...

108

Base units of the SI, fundamental constants and modern quantum physics  

Science Journals Connector (OSTI)

...Occam's razor) to our unit system to take this into...connection. When abandoning a unit for the sake of another...quantities measured with these units (e.g. equivalence between heat and mechanical energy and between mass and...mature technology of measurement is to be found. For...

2005-01-01T23:59:59.000Z

109

load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

110

Research on Short-term Load Forecasting of the Thermoelectric Boiler Based on a Dynamic RBF Neural Network  

E-Print Network [OSTI]

As thermal inertia is the key factor for the lag of thermoelectric utility regulation, it becomes very important to forecast its short-term load according to running parameters. In this paper, dynamic radial basis function (RBF) neural network...

Dai, W.; Zou, P.; Yan, C.

2006-01-01T23:59:59.000Z

111

90-MW single-shaft power generating steam-gas unit based on the GTÉ-65 gas turbine and K-30-60 steam turbine  

Science Journals Connector (OSTI)

This is an examination of a variant of the monoblock PGU-90 steam-gas unit developed at the “Leningradskii Metallicheskii Zavod” (LMZ) branch of “Silovye mashiny” based on a GTÉ-65 gas turbine unit and a K-30-...

A. S. Lebedev; O. V. Antonyuk; V. A. Mart’yanov…

2011-01-01T23:59:59.000Z

112

Phase change based cooling for high burst mode heat loads with temperature regulation above the phase change temperature  

DOE Patents [OSTI]

An apparatus and method for transferring thermal energy from a heat load is disclosed. In particular, use of a phase change material and specific flow designs enables cooling with temperature regulation well above the fusion temperature of the phase change material for medium and high heat loads from devices operated intermittently (in burst mode). Exemplary heat loads include burst mode lasers and laser diodes, flight avionics, and high power space instruments. Thermal energy is transferred from the heat load to liquid phase change material from a phase change material reservoir. The liquid phase change material is split into two flows. Thermal energy is transferred from the first flow via a phase change material heat sink. The second flow bypasses the phase change material heat sink and joins with liquid phase change material exiting from the phase change material heat sink. The combined liquid phase change material is returned to the liquid phase change material reservoir. The ratio of bypass flow to flow into the phase change material heat sink can be varied to adjust the temperature of the liquid phase change material returned to the liquid phase change material reservoir. Varying the flowrate and temperature of the liquid phase change material presented to the heat load determines the magnitude of thermal energy transferred from the heat load.

The United States of America as represented by the United States Department of Energy (Washington, DC)

2009-12-15T23:59:59.000Z

113

Commercial and Residential Hourly Load Profiles for all TMY3 Locations in  

Open Energy Info (EERE)

and Residential Hourly Load Profiles for all TMY3 Locations in and Residential Hourly Load Profiles for all TMY3 Locations in the United States Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Hourly load profiles are available for over all TMY3 locations in the United States here. Browse files in this dataset, accessible as individual files and as commercial and residential downloadable ZIP files. This dataset is approximately 4.8GiB compressed or 19GiB uncompressed. July 2nd, 2013 update: Residential High and Low load files have been updated from 366 days in a year for leap years to the more general 365 days in a normal year.

114

VLSI ARCHITECTURE OF AN INVISIBLE WATERMARKING UNIT FOR A BIOMETRIC-BASED SECURITY SYSTEM IN A DIGITAL CAMERA  

E-Print Network [OSTI]

VLSI ARCHITECTURE OF AN INVISIBLE WATERMARKING UNIT FOR A BIOMETRIC-BASED SECURITY SYSTEM is performed using an invisible watermarking algorithm that allows for verification of the image as well implementing the invisible watermarking algorithm towards the development of the camera. I. INTRODUCTION

Mohanty, Saraju P.

115

United States | OpenEI Community  

Open Energy Info (EERE)

United States United States Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 16 August, 2013 - 12:21 New report from White House outlines largest problems facing United States energy grid energy grid OpenEI President Smart Grid United States White House Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data Graham7781's picture Submitted by Graham7781(1992) Super contributor 29 October, 2012 - 14:46 East Coast Utilities prepare for Hurricane Sandy

116

Integrating the cold load pickup effect of reserve supplying demand response resource in social cost minimization based system scheduling  

Science Journals Connector (OSTI)

Expansion of smart grids and aggregator business facilitates the utilization of reserve supplying demand response (RSDR) resources. One of the loads that are increasingly used for reserve provision is air-conditioning load (ACL) that have cold load pickup (CLPU) or “payback” characteristics. With larger scale utilization of RSDR resources, as an effect of increasing DR aggregation business, CLPU characteristics of ACL can affect system optimal operation. Actual utilization time and duration of RSDR resources are probabilistic and affected by system scheduling and contingency occurrence. Therefore the CLPU effect of RSDR resources is probabilistic. This creates extra burden on the system reliability maintenance that should be considered from social cost minimization point of view. This complexity is addressed in this paper by modeling the extra expected load not supplied (ELNS) that the probabilistic CLPU of RSDR can impose on system. Then the aggregated RSDR resources, with CLPU characteristics, are integrated into day-ahead simultaneous system scheduling with the objective function of social cost minimization. This study showed that CLPU can have considerable effects on system scheduling and RSDR effectiveness. The proposed method of this paper proved to be useful for reducing the negative effects of CLPU while using RSDR resources.

Mahdi Behrangrad; Hideharu Sugihara; Tsuyoshi Funaki

2012-01-01T23:59:59.000Z

117

Abstract--This work develops a three-phase unbalanced load flow tool tailored for radial distribution networks based  

E-Print Network [OSTI]

) generators where most of the systems are single phase. New ancillary service such as static reactive power, thermal limits of grid components and power losses in radial MV-LV networks with photovoltaic (PV support by PV inverters can be also merged together with the load flow solution tool and thus, the impact

Teodorescu, Remus

118

Distribution-Based Clustering: Using Ecology To Refine the Operational Taxonomic Unit  

E-Print Network [OSTI]

16S rRNA sequencing, commonly used to survey microbial communities, begins by grouping individual reads into operational taxonomic units (OTUs). There are two major challenges in calling OTUs: identifying bacterial population ...

Preheim, Sarah Pacocha

119

The effects of a broad based energy tax on the United States economy  

Science Journals Connector (OSTI)

This paper investigates the effects of a broad based energy tax on the United States economy in general and the agricultural sectors in particular. The analytical approach used in the analysis consists of a general equilibrium model composed of fourteen producing sectors, fourteen consuming sectors, six household categories classified by income and a government. The effects of imposing a tax on natural gas, coal, and nuclear power of 25.7 cents per million Btu's and a tax on refined petroleum products of 59.9 cents per million Btu's on prices and quantities are examined. The results are revealing. For example, a Btu tax on energy imposed at the point of production will result in lower output by the producing sectors (by about $122.4 billion US), a decrease in the consumption of goods and services (by about $64.6 billion), and a reduction in welfare (by about $66.6 billion). The government would realize an increase in revenue of about $50.5 billion. In the case of the Btu tax being imposed at the point of consumption, there will be lower output by the producing sectors (by about $83.7 billion), a reduction in the consumption of goods and services (by about $48.3 billion), and a reduction in welfare (by about $49.5 billion). The government would realize an increase in revenue of $41.5 billion. The agricultural sectors would be measurably impacted. For example, if the Btu tax is imposed at the point of production, output in the program crops sector will fall (by $637 million), output in the livestock sector will decline (by $257 million), output in the all other agriculture commodities sector will be reduced (by $54 million), and output in the forestry sector will rise (by $144 million). If the Btu tax is imposed at the point of consumption, output in the program crops sector will fall (by $720 million), output in the livestock sector will decline (by $453 million), output in the all other agriculture commodities sector will be reduced (by $371 million), and output in the forestry sector will rise (by $25 million). Finally, when subjected to a sensitivity analysis, the results are reasonably robust with regard to the assumption of the values of the substitution elasticities.

Noel D. Uri; Roy Boyd

1994-01-01T23:59:59.000Z

120

Demonstration of Advanced Technologies for Multi-Load Washers in Hospitality and Healthcare – Ozone Based Laundry Systems  

SciTech Connect (OSTI)

The objective of this demonstration project was to evaluate market-ready retrofit technologies for reducing the energy and water use of multi-load washers in healthcare and hospitality facilities. Specifically, this project evaluated laundry wastewater recycling technology in the hospitality sector and ozone laundry technology in both the healthcare and hospitality sectors. This report documents the demonstration of ozone laundry system installations at the Charleston Place Hotel in Charleston, Sout Carolina, and the Rogerson House assisted living facility in Boston, Massachusetts.

Boyd, Brian K.; Parker, Graham B.; Petersen, Joseph M.; Sullivan, Greg; Goetzler, W.; Sutherland, T. A.; Foley, K. J.

2014-08-14T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Optimum Capacity Allocation of DG Units Based on Unbalanced Three-phase Optimal Power Flow  

E-Print Network [OSTI]

of distributed generation (DG). Some positive support benefits of DG installation are system energy loss distribution system planning is necessary. Adnan Anwar and H. R. Pota are with the School of Engineering for determining opti- mum generation capacity of multiple distributed generation (DG) units is presented

Pota, Himanshu Roy

122

PEV-based Reactive Power Compensation for Wind DG Units: A Stackelberg Game Approach  

E-Print Network [OSTI]

--There has been a growing interest recently towards integrating more renewable energy resources management solutions for renewable wind and solar energy integration. In addition to the need for constantly challenges to integrate these DG units. Above all, there exists no accurate long term wind power prediction

Huang, Jianwei

123

Load Management for Industry  

E-Print Network [OSTI]

In the electric utility industry, load management provides the opportunity to control customer loads to beneficially alter a utility's load curve Load management alternatives are covered. Load management methods can be broadly classified into four...

Konsevick, W. J., Jr.

1982-01-01T23:59:59.000Z

124

United States- Land Based and Offshore Annual Average Wind Speed at 100 Meters  

Broader source: Energy.gov [DOE]

Full-size, high resolution version of the 100-meter land-based and offshore wind speed resource map.

125

Dynamic load balancing of applications  

DOE Patents [OSTI]

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

Wheat, Stephen R. (Albuquerque, NM)

1997-01-01T23:59:59.000Z

126

A maximum power tracking algorithm based on photovoltaic current control for matching loads to a photovoltaic generator  

Science Journals Connector (OSTI)

In this paper, a novel maximum power point tracking (MPPT) approach is studied. It is based on the photovoltaic (PV) current control. The last one...

Ben Hamed Mouna; Sbita Lassaâd

2012-10-01T23:59:59.000Z

127

Load Data and Load Vector Assembly  

Science Journals Connector (OSTI)

Data for loading cases in solid mechanics problems is described. The following external loading factors can be specified: concentrated nodal forces, distributed surface forces, and thermal loading. JavaTM class F...

2010-01-01T23:59:59.000Z

128

A neural network based approach to estimate of power system harmonics for an induction furnace under the different load conditions  

Science Journals Connector (OSTI)

This study presents an artificial neural network based intelligent monitoring algorithm to detect of a power system harmonics. The proposed approach was tested on the current and voltage data of an induction furn...

Hayrettin Gokozan; Sezai Taskin; Serhat Seker; Huseyin Ekiz

2014-11-01T23:59:59.000Z

129

Invited paper in the Proceedings of the United Engineering Foundation Conference on Risk-Based Decision-Making in Water Resources IX, "20-Year Retrospective and Prospective of  

E-Print Network [OSTI]

1 Invited paper in the Proceedings of the United Engineering Foundation Conference on Risk- Based with information from other sources, in the form of a business case [Bowles 2000b] for proceeding with dam safety

Bowles, David S.

130

An integrated computer-based training simulator for the operative personnel of the 800-MW power-generating unit at the Perm District Power Station  

Science Journals Connector (OSTI)

The integrated computer-based training simulator for an 800-MW power-generating unit is described. Its capacities for training the personnel of the boiler-turbine and chemical departments are shown.

N. Yu. Pevneva; V. N. Piskov; A. N. Zenkov

2007-07-01T23:59:59.000Z

131

16 Load Data Cleansing and Bus Load  

E-Print Network [OSTI]

375 16 Load Data Cleansing and Bus Load Coincidence Factors* Wenyuan Li, Ke Wang, and Wijarn Wangdee 16.1 INTRODUCTION Load curve data refer to power consumptions recorded by meters at certain time intervals at buses of individual substations. Load curve data are one of the most important datasets

Wang, Ke

132

building load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

133

Examination of Process Implementation of Evidence-based Design Initiatives on United States Army Medical Construction  

E-Print Network [OSTI]

be found historical precedents, perhaps the most famous being the imminently practical design changes instituted by Florence Nightingale in her statistically based work to change British field hospitals? operation and configuration during the 1853... Crimean War (Rehmeyer, 2009), which resulted in the drop of soldier deaths from disease from 42% to 3%. Of specific note is the long-term impact Nightingale?s work had on the British health system; its ripples are still felt in today?s modern healthcare...

Marsh, Glenn Edward

2011-08-08T23:59:59.000Z

134

Human Papillomavirus 16 Load and E2/E6 Ratio in HPV16-Positive Women: Biomarkers for Cervical Intraepithelial Neoplasia ?2 in a Liquid-Based Cytology Setting?  

Science Journals Connector (OSTI)

...investigates whether HPV16 viral load and/or integration state could...previous studies, a high HPV16 load has been reported to be associated...10-18). However, conflicting data have been published, suggesting that viral load may not be an adequate predictor...

Gaëlle A.V. Boulet; Ina H. Benoy; Christophe E. Depuydt; Caroline A.J. Horvath; Marc Aerts; Niel Hens; Annie J. Vereecken; and Johannes J. Bogers

2009-11-01T23:59:59.000Z

135

Parallel map projection of vector-based big spatial data: Coupling cloud computing with graphics processing units  

Science Journals Connector (OSTI)

Abstract The objective of this article is to present a framework that couples cloud and high-performance computing for the parallel map projection of vector-based big spatial data. The past few years have witnessed a tremendous growth of a variety of high-volume spatial data—i.e., big spatial data. Map projection is often needed, for example, when we apply these big spatial data into large-scale spatial analysis and modeling approaches that require a common coordinate system. However, due to the size of these data and algorithmic complexity of map projections, the transformation of big spatial data between alternative projections represents a pressing computational challenge. Recent advancement in cloud computing and high-performance computing offers a potential means of addressing this computational challenge. The parallel map projection framework presented in this study is based on a layered architecture that couples capabilities of cloud computing and high-performance computing accelerated by Graphics Processing Units. We use large LiDAR data as an example of vector-based big spatial data to investigate the utility of the parallel map projection framework. As experimental results reveal, the framework provides considerable acceleration for re-projecting vector-based big spatial data. Coupling high-performance and cloud computing, which complement to each other, is a suggested solution for the efficient processing and analysis of big spatial data.

Wenwu Tang; Wenpeng Feng

2014-01-01T23:59:59.000Z

136

Load Shedding in Data Stream Management Systems Using Application Semantics  

Science Journals Connector (OSTI)

Data Stream Management Systems (DSMSs) process highly ... literature, including capacity planning, scheduling, and load shedding. Existing load shedding approaches drop tuples either randomly or based on the char...

Raman Adaikkalavan

2012-01-01T23:59:59.000Z

137

Direct measurement of instantaneous source speed for a HDR brachytherapy unit using an optical fiber based detector  

SciTech Connect (OSTI)

Purpose: Several attempts to determine the transit time of a high dose rate (HDR) brachytherapy unit have been reported in the literature with controversial results. The determination of the source speed is necessary to accurately calculate the transient dose in brachytherapy treatments. In these studies, only the average speed of the source was measured as a parameter for transit dose calculation, which does not account for the realistic movement of the source, and is therefore inaccurate for numerical simulations. The purpose of this work is to report the implementation and technical design of an optical fiber based detector to directly measure the instantaneous speed profile of a {sup 192}Ir source in a Nucletron HDR brachytherapy unit. Methods: To accomplish this task, we have developed a setup that uses the Cerenkov light induced in optical fibers as a detection signal for the radiation source moving inside the HDR catheter. As the {sup 192}Ir source travels between two optical fibers with known distance, the threshold of the induced signals are used to extract the transit time and thus the velocity. The high resolution of the detector enables the measurement of the transit time at short separation distance of the fibers, providing the instantaneous speed. Results: Accurate and high resolution speed profiles of the {sup 192}Ir radiation source traveling from the safe to the end of the catheter and between dwell positions are presented. The maximum and minimum velocities of the source were found to be 52.0{+-}1.0 and 17.3{+-}1.2 cm/s. The authors demonstrate that the radiation source follows a uniformly accelerated linear motion with acceleration of |a|=113 cm/s{sup 2}. In addition, the authors compare the average speed measured using the optical fiber detector to those obtained in the literature, showing deviation up to 265%. Conclusions: To the best of the authors' knowledge, the authors directly measured for the first time the instantaneous speed profile of a radiation source in a HDR brachytherapy unit traveling from the unit safe to the end of the catheter and between interdwell distances. The method is feasible and accurate to implement on quality assurance tests and provides a unique database for efficient computational simulations of the transient dose.

Minamisawa, R. A.; Rubo, R. A.; Seraide, R. M.; Rocha, J. R. O.; Almeida, A. [Department of Physics and Mathematics, FFCLRP, University of Sao Paulo, 14040-901, Ribeirao Preto-SP (Brazil); INRAD, Medical School - University of Sao Paulo, Clinical Hospital (HCUSP), 05403-001, Sao Paulo-SP (Brazil); CAISM Radiotherapy Service, CEB, State University of Campinas, 13083-881, Campinas-SP (Brazil); Department of Physics and Mathematics, FFCLRP, University of Sao Paulo, 14040-901, Ribeirao Preto-SP (Brazil)

2010-10-15T23:59:59.000Z

138

Development of a micro-cogeneration laboratory and testing of a natural gas CHP unit based on PEM fuel cells  

Science Journals Connector (OSTI)

Abstract This work discusses the design and the development of a Laboratory of Micro-Cogeneration (LMC) at Politecnico di Milano. The LMC laboratory is a unique structure devoted to small-scale power generation, with the main goals of testing and improving the performance of systems that produce or utilize electric and thermal (hot and/or cold) power in a very general sense, spanning from combined heat and power (CHP) units to heaters, from absorption chillers to heat pumps, but also able to perform tests on fuel processors and electrolyzers. The laboratory features a supply of natural gas as well as H2 and O2 from a high pressure electrolyzer and of CO, CO2 and N2 from bottles, permitting to carry out experiments with simulated synthesis fuels. The maximum allowable electrical power produced, exported to the grid or to an electronic loadbank, or consumed by the system under test is 100 kW; maximum allowable thermal power is roughly 200 kW with variable temperature water circuits (from chilled water up to a 150 °C at 8 bar superheated water loop). This work outlines also the instruments used for on-line recording of thermodynamic properties, emissions and power, aiming at monitoring and reconstructing mass and energy balances. One of the first experimental campaign has been carried out on a CHP system based on polymer electrolyte membrane fuel cells (PEM), a promising candidate for distributed CHP thanks to low pollutant emissions and good efficiency, rapid startup and flexibility, although affected by a rather complex fuel processing section to provide the appropriate fuel to the PEM. This work presents the experimental analysis of a 20 kW prototype PEM CHP system complete of natural gas processor. The prototype is operated at LMC to characterize the processing section and the thermodynamic performances of the overall system. Despite its non-optimized layout, the unit has shown encouraging total efficiency (76%) and primary energy saving index (6%).

S. Campanari; G. Valenti; E. Macchi; G. Lozza; N. Ravidà

2014-01-01T23:59:59.000Z

139

Electrical and Production Load Factors  

E-Print Network [OSTI]

, Texas Abstract Load factors and operating hours of small and medium-sized industrial plants are analyzed to classify shift-work patterns and develop energy conservation diagnostic tools. This paper discusses two types of electric load factors... for each shift classification within major industry groups. The load factor based on billing hours (ELF) increases with operating hours from about 0.4 for a nominal one shift operation, to about 0.7 for around-the-clock operation. On the other hand...

Sen, T.; Heffington, W. M.

140

Best Buys and Unit Pricing  

E-Print Network [OSTI]

This guide explains how to determine a unit price--the cost of an item based on a specific unit such as pound or ounce. Unit pricing can be used to identify foods that are the most economical....

Anding, Jenna

2000-02-02T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Unit Testing Discussion C  

E-Print Network [OSTI]

Unit Testing Discussion C #12;Unit Test public Method is smallest unit of code Input/output transformation Test if the method does what it claims Not exactly black box testing #12;Test if (actual result Expected Computed Input #12;Functionality Computation ­ Easy to test Time based Asynchronous interaction

Massachusetts at Amherst, University of

142

Energy-efficient optical network units for OFDM PON based on time-domain interleaved OFDM technique  

Science Journals Connector (OSTI)

We propose and experimentally demonstrate a new scheme to reduce the energy consumption of optical network units (ONUs) in orthogonal frequency division multiplexing passive optical...

Hu, Xiaofeng; Cao, Pan; Zhang, Liang; Jiang, Lipeng; Su, Yikai

2014-01-01T23:59:59.000Z

143

1994 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The 1994 Pacific Northwest Loads and Resources Study presented herein establishes a picture of how the agency is positioned today in its loads and resources balance. It is a snapshot of expected resource operation, contractual obligations, and rights. This study does not attempt to present or analyze future conservation or generation resource scenarios. What it does provide are base case assumptions from which scenarios encompassing a wide range of uncertainties about BPA`s future may be evaluated. The Loads and Resources Study is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the 1993 Pacific Northwest Loads and Resources Study, published in December 1993. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The Federal system and regional analyses for medium load forecast are presented.

United States. Bonneville Power Administration.

1994-12-01T23:59:59.000Z

144

High payload six-axis load sensor  

DOE Patents [OSTI]

A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

Jansen, John F. (Knoxville, TN); Lind, Randall F. (Knoxville, TN)

2003-01-01T23:59:59.000Z

145

API unit  

Science Journals Connector (OSTI)

API unit [An arbitrary unit of the American Petroleum Institute for measuring natural radioactivity; used in certain well logging methods] ? API-Einheit f

2014-08-01T23:59:59.000Z

146

Demonstration and evaluation of the 20-ton-capacity load-cell-based weighing system, Eldorado Resources, Ltd. , Port Hope, Ontario, September 3-4, 1986  

SciTech Connect (OSTI)

On September 3 and 4, 1986, the prototype 20-ton-capacity load-cell-based weighing system (LCBWS) developed by the US Enrichment Safeguards Program (ESP) at Martin Marietta Energy Systems, Inc., was field tested at the Eldorado Resources, Ltd., (ERL) facility in Port Hope, Ontario. The 20-ton-capacity LCBWS has been designed and fabricated for use by the International Atomic Energy Agency (IAEA) for verifying the masses of large-capacity UF/sub 6/ cylinders during IAEA safeguards inspections at UF/sub 6/ handling facilities. The purpose of the Canadian field test was to demonstrate and to evaluate with IAEA inspectorates and with UF/sub 6/ bulk handling facility operators at Eldorado the principles, procedures, and hardware associated with using the 20-ton-capacity LCBWS as a portable means for verifying the masses of 10- and 14-ton UF/sub 6/ cylinders. Session participants included representatives from the IAEA, Martin Marietta Energy Systems, Inc., Eldorado Resources, Ltd., the Atomic Energy Control Board (AECB), and the International Safeguards Project Office (ISPO) at Brookhaven National Laboratory (BNL). Appendix A presents the list of participants and their organization affiliation. The two-day field test involved a formal briefing by ESP staff, two cylinder weighing sessions, IAEA critiques of the LCBWS hardware and software, and concluding discussions on the field performance of the system. Appendix B cites the meeting agenda. Summarized in this report are (1) the technical information presented by the system developers, (2) results from the weighing sessions, and (3) observations, suggestions, and concluding statements from meeting participants.

Cooley, J.N.; Huxford, T.J.

1986-10-01T23:59:59.000Z

147

Load sensing system  

DOE Patents [OSTI]

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

1999-01-01T23:59:59.000Z

148

Loading margin Stable operating  

E-Print Network [OSTI]

Linear approximation at p1 Actual loading margin Loadingmargin Parameter p p1 p2 p3 IEEE Transactions collapse. Linear and quadratic estimates to the variation of the loading margin with respect to any sys power support, wheeling, load model param- eters, line susceptance, and generator dispatch. The accuracy

149

Peak load management: Potential options  

SciTech Connect (OSTI)

This report reviews options that may be alternatives to transmission construction (ATT) applicable both generally and at specific locations in the service area of the Bonneville Power Administration (BPA). Some of these options have potential as specific alternatives to the Shelton-Fairmount 230-kV Reinforcement Project, which is the focus of this study. A listing of 31 peak load management (PLM) options is included. Estimated costs and normalized hourly load shapes, corresponding to the respective base load and controlled load cases, are considered for 15 of the above options. A summary page is presented for each of these options, grouped with respect to its applicability in the residential, commercial, industrial, and agricultural sectors. The report contains comments on PLM measures for which load shape management characteristics are not yet available. These comments address the potential relevance of the options and the possible difficulty that may be encountered in characterizing their value should be of interest in this investigation. The report also identifies options that could improve the efficiency of the three customer utility distribution systems supplied by the Shelton-Fairmount Reinforcement Project. Potential cogeneration options in the Olympic Peninsula are also discussed. These discussions focus on the options that appear to be most promising on the Olympic Peninsula. Finally, a short list of options is recommended for investigation in the next phase of this study. 9 refs., 24 tabs.

Englin, J.E.; De Steese, J.G.; Schultz, R.W.; Kellogg, M.A.

1989-10-01T23:59:59.000Z

150

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

193 UNIT NUMBER: 197 UNIT NAME: CONCRETE RUBBLE PILE (30) REGULATORY STATUS: AOC LOCATION: Outside plant security fence, north of the plant on Big Bayou Creek on private property....

151

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

152

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

153

Load sensing system  

DOE Patents [OSTI]

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

1999-05-04T23:59:59.000Z

154

Data Mining in Load Forecasting of Power System  

Science Journals Connector (OSTI)

This project applies Data Mining technology to the prediction of electric power system load forecast. It proposes a mining program of electric power load forecasting data based on the similarity of time series .....

Guang Yu Zhao; Yan Yan; Chun Zhou Zhao…

2013-01-01T23:59:59.000Z

155

Predicting pipeline frost load  

SciTech Connect (OSTI)

A study was undertaken to find a formula for predicting the additional load imposed on underground pipelines by soil freezing. The authors conclude that a modified Boussinesq equation can be used to assess this load. Results also showed that frost affects the modulus of soil reaction and therefore the induced stress in flexible pipe.

Fielding, M.B.; Cohen, A.

1988-11-01T23:59:59.000Z

156

Short-Term Load Forecasting This paper discusses the state of the art in short-term load fore-  

E-Print Network [OSTI]

spectrum of time intervals. In therange of seconds, when load variationsare small and random, the automatic by a number of generation control functions such as hydro scheduling, unit commitment, hydro-ther- mal present, functions such as fuel, hydro, and maintenance scheduling are performed to ensure that the load

Gross, George

157

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

174 10 12 92 UNIT NAME: C-745-K Low Level Storage Area REGULATORY STAU: -AOC LOCATION: Inside Security Fence , South of C-333 Cascade Building. APPROXIMATE...

158

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 UNIT NAME C-611 Underaround Diesel Tank REGULATORY STATUS: AOC LOCATION: Immediately southeast of C-611 APPROXIMATE DIMENSIONS: 1000 gallon FUNCTION: Diesel storage OPERATIONAL...

159

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 KOW Toluene SDill Area UNIT NAME: REGULATORY STATUS: AOC LOCATION: Southwest of plant site APPROXIMATE DIMENSIONS: 200 feet wide by 800 feet ong FUNCTION: Storage of Toluene...

160

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 UNIT NAME C-746-Al REGULATORY STATUS: AOC LOCATION: Northwest corner of C-746-A APPROXIMATE DIMENSIONS: 4000 gallons FUNCTION: Underground storage tanks OPERATIONAL STATUS:...

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 UNIT NAME C-611 Underaround Gasoline Tank REGULATORY STATUS: AOC LOCATION: Immediately east of C-61l APPROXIMATE DIMENSIONS: 50 ga on FUNCTION: Gasoline storage OPERATIONAL...

162

Techno-economic analysis of a coal-fired CHP based combined heating system with gas-fired boilers for peak load compensation  

Science Journals Connector (OSTI)

Combined heat and power (CHP) plants dominate the heating market in China. With the ongoing energy structure reformation and increasing environmental concerns, we propose gas-fired boilers to be deployed in underperforming heating substations of heating networks for peak load compensation, in order to improve both energy efficiency and environmental sustainability. However, due to the relatively high price of gas, techno-economic analysis is required for evaluating different combined heating scenarios, characterized by basic heat load ratio (?). Therefore, we employ the dynamic economics and annual cost method to develop a techno-economic model for computing the net heating cost of the system, considering the current state of the art of cogeneration systems in China. The net heating cost is defined as the investment costs and operations costs of the system subtracted by revenues from power generation. We demonstrate the model in a real-life combined heating system of Daqing, China. The results show that the minimum net heating cost can be realized at ?=0.75 with a cost reduction of 16.8% compared to coal heating alone. Since fuel cost is the dominating factor, sensitivity analyses on coal and gas prices are discussed subsequently.

Hai-Chao Wang; Wen-Ling Jiao; Risto Lahdelma; Ping-Hua Zou

2011-01-01T23:59:59.000Z

163

High power-saving and fidelity-conserving object-based local dimming for LCD systems with LED-based backlight units  

Science Journals Connector (OSTI)

A local dimming technique which is enabled on LED-based LCD systems is expected to give more power saving than a global one. However, prior local dimming techniques have not considered human visual system-awareness much as done in an advanced global ... Keywords: Backlight dimming, Complexity, Fidelity, Human visual system, LED BLU-based LCD, Object-based local dimming, Power

Aldhino Anggorosesar, Young-Jin Kim

2014-09-01T23:59:59.000Z

164

Building Energy Software Tools Directory: QwickLoad  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

QwickLoad QwickLoad QwickLoad logo QwickLoad uses the ASHRAE TFM (Transfer Function Method) algorithms combined with a screen interface that provides building load calculations. It includes a Duct Sizing Program and supports IP and SI units. QwickLoad Residential 7.0 provides heat gain and heat loss calculations for up to 10 zones. QwickLoad Commercial 7.0 provides heat gain and heat loss calculations for up to 500 zones. Zones and plenums can be added or deleted with one button click. Intuitive screens for entering building information. Default is automatically displayed. Construction types for roofs, walls, partitions, windows, shade types, and scheduling control. Complete air-conditioning and heating system control and supply, return, heating and cooling duct static pressure specification. Energy recovery ventilator can

165

S-Band Loads for SLAC Linac  

SciTech Connect (OSTI)

The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

Krasnykh, A.; Decker, F.-J.; /SLAC; LeClair, R.; /INTA Technologies, Santa Clara

2012-08-28T23:59:59.000Z

166

Scalable Load Distribution and Load Balancing for Dynamic Parallel Programs  

E-Print Network [OSTI]

shown that the algorithm scales according to the definition of scalability given following. LoadScalable Load Distribution and Load Balancing for Dynamic Parallel Programs E. Berger and J. C of an integrated load distribution-load balancing algorithm which was targeted to be both efficient and scalable

Berger, Emery

167

The virtual digital nuclear power plant: A modern tool for supporting the lifecycle of VVER-based nuclear power units  

Science Journals Connector (OSTI)

The article describes the “Virtual Digital VVER-Based Nuclear Power Plant” computerized system comprising a totality of verified ... a model intended for describing the behavior of nuclear power plant (NPP) syste...

G. V. Arkadov; A. P. Zhukavin; A. E. Kroshilin; I. A. Parshikov…

2014-10-01T23:59:59.000Z

168

Unit Commitment Considering Generation Flexibility and Environmental Constraints  

SciTech Connect (OSTI)

This paper proposes a new framework for power system unit commitment process, which incorporates the generation flexibility requirements and environmental constraints into the existing unit commitment algorithm. The generation flexibility requirements are to address the uncertainties with large amount of intermittent resources as well as with load and traditional generators, which causes real-time balancing requirements to be variable and less predictable. The proposed flexibility requirements include capacity, ramp and ramp duration for both upward and downward balancing reserves. The environmental constraints include emission allowance for fossil fuel-based generators and ecological regulations for hydro power plants. Calculation of emission rates is formulated. Unit commitment under this new framework will be critical to the economic and reliable operation of the power grid and the minimization of its negative environmental impacts, especially when high penetration levels of intermittent resources are being approached, as required by the renewable portfolio standards in many states.

Lu, Shuai; Makarov, Yuri V.; Zhu, Yunhua; Lu, Ning; Prakash Kumar, Nirupama; Chakrabarti, Bhujanga B.

2010-07-31T23:59:59.000Z

169

HLW Glass Waste Loadings  

Broader source: Energy.gov (indexed) [DOE]

HLW HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of America Washington, DC Overview Overview  Vitrification - general background  Joule heated ceramic melter (JHCM) technology  Factors affecting waste loadings  Waste loading requirements and projections  WTP DWPF  DWPF  Yucca Mountain License Application requirements on waste loading  Summary Vitrification  Immobilization of waste by conversion into a glass  Internationally accepted treatment for HLW  Why glass?  Amorphous material - able to incorporate a wide spectrum of elements over wide ranges of composition; resistant to radiation damage  Long-term durability - natural analogs Relatively simple process - amenable to nuclearization at large  Relatively simple process - amenable to nuclearization at large scale  There

170

Buildings Stock Load Control  

E-Print Network [OSTI]

: An assembly of the various blocks of the library of simbad and simulink permit to model building. Finally the last part prensents the study results: Graphs and tables to see the load shedding strategies impacts....

Joutey, H. A.; Vaezi-Nejad, H.; Clemoncon, B.; Rosenstein, F.

2006-01-01T23:59:59.000Z

171

Hanford Apatite Treatability Test Report Errata: Apatite Mass Loading Calculation  

SciTech Connect (OSTI)

The objective of this errata report is to document an error in the apatite loading (i.e., treatment capacity) estimate reported in previous apatite treatability test reports and provide additional calculation details for estimating apatite loading and barrier longevity. The apatite treatability test final report (PNNL-19572; Vermeul et al. 2010) documents the results of the first field-scale evaluation of the injectable apatite PRB technology. The apatite loading value in units of milligram-apatite per gram-sediment is incorrect in this and some other previous reports. The apatite loading in units of milligram phosphate per gram-sediment, however, is correct, and this is the unit used for comparison to field core sample measurements.

Szecsody, James E.; Vermeul, Vincent R.; Williams, Mark D.; Truex, Michael J.

2014-05-19T23:59:59.000Z

172

The Development of a General Purpose ARM-based Processing Unit for the ATLAS TileCal sROD  

E-Print Network [OSTI]

The Large Hadron Collider at CERN generates enormous amounts of raw data which present a serious computing challenge. After Phase-II upgrades in 2022, the data output from the ATLAS Tile Calorimeter will increase by 200 times to 41 Tb/s! ARM processors are common in mobile devices due to their low cost, low energy consumption and high performance. It is proposed that a cost-effective, high data throughput Processing Unit (PU) can be developed by using several consumer ARM processors in a cluster configuration to allow aggregated processing performance and data throughput while maintaining minimal software design difficulty for the end-user. This PU could be used for a variety of high-level functions on the high-throughput raw data such as spectral analysis and histograms to detect possible issues in the detector at a low level. High-throughput I/O interfaces are not typical in consumer ARM System on Chips but high data throughput capabilities are feasible via the novel use of PCI-Express as the I/O interface ...

Cox, Mitchell Arij; The ATLAS collaboration; Mellado Garcia, Bruce Rafael

2014-01-01T23:59:59.000Z

173

Determination of monitor unit check tolerances based on a comparison with measurement and treatment planning system data  

SciTech Connect (OSTI)

ABSTRACT: This work describes the experimental validation of treatment planning system monitor unit (MU) calculations against measurement for a range of scenarios. This, together with a comparison of treatment planning system MUs and an independent MU check method, allows the derivation of confidence intervals for the check process. Data were collected for open and 60° motorized wedge fields using an Elekta Synergy linac at 6 and 8 MV using homogeneous and heterogeneous phantoms. Masterplan (Version 4.0) pencil-beam and collapsed cone algorithms were used for the primary MU calculations with full inhomogeneity correction. Results show that both algorithms agree with measurement to acceptable tolerance levels in the majority of the cases studied. The confidence interval for the pencil-beam algorithm MU against an independent check was determined as + 1.6% to ?3.4%. This is modified to + 2.3% to ?2.5% when data collected with low-density heterogeneities are removed as this algorithm is not used clinically for these cases. The corresponding interval for the collapsed cone algorithm was + 1.2% to ?4.3%, indicating that an offset tolerance for the independent check is appropriate. Analysis of clinical conformal treatment plan data generated using the pencil-beam algorithm (1393 beams) returned 93% of beams within the independent check tolerance. Similarly, using the collapsed cone algorithm as the primary MU calculation, 77% (of 1434 beams) were within the confidence interval.

Curtis, Helen [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Richmond, Neil, E-mail: neil.richmond@stees.nhs.uk [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Burke, Kevin; Walker, Chris [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom)

2013-04-01T23:59:59.000Z

174

Emergy-based life cycle assessment (Em-LCA) of multi-unit and single-family residential buildings in Canada  

Science Journals Connector (OSTI)

Abstract The construction and building process depends on substantial consumption of natural resources with far-reaching impacts beyond their development area. In general, a significant portion of annual resource consumption by the building and construction industry is a result of applying traditional building strategies and practices such as designing and selecting types of development (e.g. multi-unit condo and single-family house, etc.), building materials and structure, heating/cooling systems, and planning renovation and maintenance practices. On the other hand, apart from structural suitability, building developers mostly consider the basic requirements of public owners or private occupants of the buildings, where the main criteria for selecting building strategies are costs, and long-term environmental and socio-economic impacts are generally ignored. The main purpose of this paper is to develop an improved building sustainability assessment framework to measure and integrate different sustainability factors, i.e. long-term environmental upstream and downstream impacts and associated socio-economic costs, in a unified and quantitative basis. The application of the proposed framework has been explained through a case study of single-family houses and multi-unit residential buildings in Canada. A comprehensive framework based on the integration of emergy synthesis and life cycle assessment (LCA) has been developed and applied. The results of this research prove that the proposed emergy-based life cycle assessment (Em-LCA) framework offers a practical sustainability assessment tool by providing quantitative and transparent results for informed decision-making.

Bahareh Reza; Rehan Sadiq; Kasun Hewage

2014-01-01T23:59:59.000Z

175

Modality Effects on Cognitive Load and Performance in High-Load Information Presentation  

E-Print Network [OSTI]

INTRODUCTION Intelligent human-computer interfaces are often multimodal, i.e. the human-computer communications into the modality planning procedure for systems that support high-load human-computer interaction. Author Keywords-load information presenta- tion scenario. Mainly based on modality-related psychology theories, we selected five

Theune, Mariët

176

Seismic considerations in the evaluation of temporary loads  

SciTech Connect (OSTI)

Temporary loads in nuclear power facilities can result from a number of activities including special one time operating conditions, repair and upgrade conditions, and ALARA requirements for operation, inspection and maintenance. Many times evaluation of these loadings includes their consideration in conjunction with other design basis loadings such as normal loads and extreme event loads including earthquake loadings. At times this combination with design basis extreme loads, such as earthquake, results in predicted structural demands which exceed the design basis capacity. Many times a major contributor to this demand prediction is the earthquake loadings. Discussed in this paper are analytical methods, probabilistic considerations, and earthquake experienced based evaluations which can be applied to reduce the earthquake demand for short term temporary loadings.

Adams, T.M. [Stevenson and Associates, Cleveland, OH (United States); Stevenson, J.D.

1996-12-01T23:59:59.000Z

177

Composite Load Model Evaluation  

SciTech Connect (OSTI)

The WECC load modeling task force has dedicated its effort in the past few years to develop a composite load model that can represent behaviors of different end-user components. The modeling structure of the composite load model is recommended by the WECC load modeling task force. GE Energy has implemented this composite load model with a new function CMPLDW in its power system simulation software package, PSLF. For the last several years, Bonneville Power Administration (BPA) has taken the lead and collaborated with GE Energy to develop the new composite load model. Pacific Northwest National Laboratory (PNNL) and BPA joint force and conducted the evaluation of the CMPLDW and test its parameter settings to make sure that: • the model initializes properly, • all the parameter settings are functioning, and • the simulation results are as expected. The PNNL effort focused on testing the CMPLDW in a 4-bus system. An exhaustive testing on each parameter setting has been performed to guarantee each setting works. This report is a summary of the PNNL testing results and conclusions.

Lu, Ning; Qiao, Hong (Amy)

2007-09-30T23:59:59.000Z

178

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

Menxmmhmz 9 Menxmmhmz 9 1 / UNITED STATES GOVERNMENT i TO : ThcFFles . mx.f I A. B. Piccct, +3lation section : DATE: .@.eti 16, 1949 SUBJECT: VISIT To HAVY OFfDHAlfCE DEPOT, EARIZ, B.J. FmmlTo ,sYmOL: DH:ARP . . : OnJuly 8,&g the uriterattendedameeting at the Navy Oxdnce Depot at Farle, Ii. J. for the purpose of advising the navy on i-adlatlon hazards involved In the dmping of contadnated AEC wastes at /?ea. " Presint were: J. Cook - Traffic & Transportation, AEC ~J.Moren- Utilifation, AEC ..J. Ccnmigl.io - Chief of Middlesex Operaticns A. PIhot -~Hadiation Section, AEC Captain Blossoin - Navy Captain hall - Navy ThefoSkndngwas agreedupcmby AFC andthe l&v. 1. 2. 3. 4. Contaminatedmaterial dnmied, I (loose in case of large contaminated units) loaded on truck&and lsonltored at'

179

Loads Providing Ancillary Services: Review of International Experience |  

Broader source: Energy.gov (indexed) [DOE]

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

180

Loads Providing Ancillary Services: Review of International Experience |  

Broader source: Energy.gov (indexed) [DOE]

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Development programs in the United States of America for the application of cement-based grouts in radioactive waste management  

SciTech Connect (OSTI)

This paper briefly reviews seven cement-based waste form development programs at six of the US Department of Energy (DOE) sites. These sites have developed a variety of processes that range from producing 25 mm (1 in.) diameter pellets in a glove box to producing 240 m (800 ft.) diameter grout sheets within the bedding planes of a deep shale formation. These successful applications of cement-based waste forms to the many radioactive waste streams from nuclear facilities bear witness to the flexibility and reliability of this class of materials. This paper also discusses the major issues regarding the application of cement-based waste forms to radioactive waste management problems. These issues are (1) leachability, (2) radiation stability, (3) thermal stability, (4) phase complexity of the matrix, and (5) effects of the waste stream composition. A cursory review of current research in each of these areas is given This paper also discusses future trends in cement-based waste form development and applications. 31 references, 11 figures.

Dole, L.R.; Row, T.H.

1984-01-01T23:59:59.000Z

182

Building Energy Software Tools Directory: HAP System Design Load  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HAP System Design Load HAP System Design Load HAP System Design Load logo. Provides the load estimating and system design features found in its popular cousin � Carrier�s Hourly Analysis Program (HAP). By focusing on system design features, the HAP System Design Load program serves as a simpler, more efficient tool for those users only interested in system design; energy simulation features are omitted. Like the HAP program, HAP System Design Load provides the ease of use of a Windows-based graphical user interface and the computing power of modern 32-bit software. HAP System Design Load uses a system-based approach to HVAC load estimating. This approach tailors sizing procedures and results to the specific type of system being considered. A wide variety of equipment types

183

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect (OSTI)

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

184

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

185

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 UNIT NAME C-333 North Side PCB Soil Contamination REGULATORY STATUS: AOC LOCATION: North side of C-333 Building APPROXIMATE OIMENSIONS: 150 ft by 100 ft FUNCTION: Dust Palliative...

186

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 KPDES Outfall Ditch 017 Flume- Soil Backfill UNIT NAME: - REGULATORY STATUS: AOC LOCATION: South of plant on the west side of the access road APPROXIMATE DIMENSIONS: 30 feet wide...

187

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 C-617-A Sanitarv Waterline- Soil Backfill UNIT NAME: - REGULATORY STATUS: AOC LOCATION: Between southeast corner of C-531 Switchyard and C-617-A Water Treatment Facility. 4 feet...

188

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 UNIT NAME C-720 Inactive TCE Oegreaser REGULATORY STATUS: AOC LOCATION: C-720 Building APPROXIMATE DIMENSIONS: Approx. 10 ft by 10 ft by 20 f1: deep FUNCTION: Used for cleaning...

189

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 UNIT NAME Rubble Dile 46 REGULATORY STATUS: AOC LOCATION: 2000 ft southwest of curve on Kentucky Highway 473- near east end of Mitchell Lake APPROXIMATE DIMENSIONS: About 100 ft...

190

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 UNIT NAME Rubble oile 45 REGULATORY STATUS AOC LOCATION: West end of Mitche Lake APPROXIMATE DIMENSIONS: 2000 ft long, ft thick 4 ft wide FUNCTION: Control erosion on face of dam...

191

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 UNIT NAME Rubble Dile 43 REGULATORY STATUS: AOC LOCATION: West end of Happy Ho ow Lake APPROXIMATE DIMENSIONS: 200 ft long by 4 ft wide -concrete 4-6 in thickness FUNCTION:...

192

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 UNIT NAME C-740 TCE Soill Site REGULATORY STATUS: AOC LOCATION: Northwest corner C-740 concrete pad area) APPROXIMATE DIMENSIONS: 5 ft by 5 ft spill FUNCTION: Drum storage area...

193

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 C-I00 South Side Berms UNIT NAME REGULATORY STATUS: AOC LOCATION: South Side C-IOO APPROXIMATE DIMENSIONS: 2 berms approximately 200 ft long by SO ft wide eac FUNCTION:...

194

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 UNIT NAME: C-331 PCB Soil Contamination -West Side REGULATORY STATUS: AOC LOCATION: West side C-331 building APPROXIMATE DIMENSIONS: 100 feet wide by 420 feet long FUNCTION: Dust...

195

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 C-750B Diesel UST UNIT NAME REGULATORY STATUS: AOC LOCATION: Southeast corner of C-750 APPROXIMATE DIMENSIONS: 10,000 gallon FUNCTION: Diesel storage OPERATIONAL STATUS: Removed...

196

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 UNIT NAME C-633 PCB So111 Site REGULATORY STATUS CERCLA LOCATION C-633 Transformer area (Mac location 75) APPROXIMATE DIMENSIONS I Unknown FUNCTION Soill site OPERATIONAL STATUS...

197

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2007 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year...

198

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2008 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year...

199

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2003 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western Power Grid" ,"Projected Year...

200

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2009 Base Year)" ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid",,,," " ,"Projected Year...

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

,"Table 2a. Noncoincident Summer Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

Base Year)",,,," " ,"Summer Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western Power Grid" ,"Projected Year...

202

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2004 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,"Texas Power Grid","Western Power Grid" ,"Projected Year...

203

Harmonic Analysis of a Static VAR Compensated Mixed Load System.  

E-Print Network [OSTI]

??As power electronic based controllers and loads become more prevalent in power systems, there is a growing concern about how the harmonics generated by these… (more)

Ruckdaschel, James David

2009-01-01T23:59:59.000Z

204

Review of Energy Balances and Emissions Associated with Biomass-Based Transport Fuels Relevant to the United Kingdom Context  

Science Journals Connector (OSTI)

A numerical evaluation of the energy available from biomass-derived transport fuels, including biodiesel, bioethanol, and biomethane has been undertaken based on the available literature. ... Biomethane from the anaerobic digestion of crops was found to have a more favorable energy balance for the production of transport fuel than biodiesel or bioethanol (maximum 237?011 MJ/ha compared to 24?185 and 77?264 MJ/ha, respectively). ... To make the most efficient use of the limited land available for production of biofuels, it is recommended that further development of gaseous biofuels, such as biomethane and biohydrogen, are encouraged. ...

Tim Patterson; Richard Dinsdale; Sandra Esteves

2008-08-20T23:59:59.000Z

205

A stochastic framework for the grid integration of wind power using flexible load approach  

Science Journals Connector (OSTI)

Abstract Wind power integration has always been a key research area due to the green future power system target. However, the intermittent nature of wind power may impose some technical and economic challenges to Independent System Operators (ISOs) and increase the need for additional flexibility. Motivated by this need, this paper focuses on the potential of Demand Response Programs (DRPs) as an option to contribute to the flexible operation of power systems. On this basis, in order to consider the uncertain nature of wind power and the reality of electricity market, a Stochastic Network Constrained Unit Commitment associated with DR (SNCUCDR) is presented to schedule both generation units and responsive loads in power systems with high penetration of wind power. Afterwards, the effects of both price-based and incentive-based \\{DRPs\\} are evaluated, as well as DR participation levels and electricity tariffs on providing a flexible load profile and facilitating grid integration of wind power. For this reason, novel quantitative indices for evaluating flexibility are defined to assess the success of \\{DRPs\\} in terms of wind integration. Sensitivity studies indicate that DR types and customer participation levels are the main factors to modify the system load profile to support wind power integration.

E. Heydarian-Forushani; M.P. Moghaddam; M.K. Sheikh-El-Eslami; M. Shafie-khah; J.P.S. Catalão

2014-01-01T23:59:59.000Z

206

Microprocessor-controlled photovoltaic-array loading unit  

SciTech Connect (OSTI)

Described is a microprocessor-controlled test system in operation at the Photovoltaics Advanced Systems Test Facility located at Sandia National Laboratories. The test system is designed to measure the total energy output of photovoltaic arrays. The theory, installation, operation, and calibration of the test system are described.

Russell, D.F.

1982-08-01T23:59:59.000Z

207

Unit commitment with valve-point loading effect  

E-Print Network [OSTI]

Apr 18, 2014 ... Energy Conversion and Management. 2010;51(12):2580 –7. [16] Gurobi Optimization, Inc. . Gurobi Optimizer Reference Manual, Version 5.0.

2014-04-18T23:59:59.000Z

208

A Scientific Trigger Unit for Space-Based Real-Time Gamma Ray Burst Detection, II - Data Processing Model and Benchmarks  

E-Print Network [OSTI]

The Scientific Trigger Unit (UTS) is a satellite equipment designed to detect Gamma Ray Bursts (GRBs) observed by the onboard 6400 pixels camera ECLAIRs. It is foreseen to equip the low-Earth orbit French-Chinese satellite SVOM and acts as the GRB trigger unit for the mission. The UTS analyses in real-time and in great details the onboard camera data in order to select the GRBs, to trigger a spacecraft slew re-centering each GRB for the narrow field-of-view instruments, and to alert the ground telescope network for GRB follow-up observations. A few GRBs per week are expected to be observed by the camera; the UTS targets a close to 100% trigger efficiency, while being selective enough to avoid fake alerts. This is achieved by running the complex scientific algorithms on a radiation tolerant hardware, based on a FPGA data pre-processor and a CPU with a Real-Time Operating System. The UTS is a scientific software, firmware and hardware co-development. A Data Processing Model (DPM) has been developed to fully val...

Provost, Hervé Le; Flouzat, Christophe; Kestener, Pierre; Chaminade, Thomas; Donati, Modeste; Château, Frédéric; Daly, François; Fontignie, Jean

2014-01-01T23:59:59.000Z

209

Truck loading rack blending  

SciTech Connect (OSTI)

Blending, the combining of two or more components to make a single product, has become widely used in most loading rack applications. Blending should not be confused with additive injection, which is the injection of very small doses of enhancers, detergents and dyes into a product stream. Changes in the environmental protection laws in the early 90`s have put increasing demands on marketing terminals with regards to reformulated fuels and environmental protection concerns. As a result of these new mandates, terminals have turned to blending at the loading rack as an economical and convenient means in meeting these new requirements. This paper will discuss some of these mandates and how loading rack blending is used for different applications. Various types of blending will also be discussed along with considerations for each method.

Boubenider, E. [Daniel Flow Products, Inc., Houston, TX (United States)

1995-12-01T23:59:59.000Z

210

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

211

United States  

Broader source: Energy.gov (indexed) [DOE]

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

212

A High-Resolution Transmission-Type (TT) Phaser Based on Reflection-Type (RT) Units for Radio Analog Signal Processing (R-ASP)  

E-Print Network [OSTI]

A high Radio Analog Signal Processing (R-ASP) resolution transmission-type (TT) phaser based on reflection-type (RT) phaser units is introduced, theoretically studied and experimentally demonstrated. It is first shown that RT phasers inherently exhibit higher R-ASP resolution than their TT counterparts because their group delay swing is proportional to the reflection coefficient associated with a resonator coupling mechanism (admittance inverter), easy to maximize towards unity, rather than to a coupled-line coupling coefficient, typically restricted to values will inferior to unity, as in the RT case. Moreover, a detailed sensitivity analysis reveals that the proposed phaser is simultaneously features high R-ASP resolution and low sensitivity to fabrication tolerance, which makes it an ideal solution for R-ASP. The proposed phaser exhibits a 5 ns group delay swing over a fractional bandwidth of about 50% around 4 GHz.

Zou, Lianfeng

2014-01-01T23:59:59.000Z

213

High-power radio frequency pulse generation and extration based on wakefield excited by an intense charged particle beam in dielectric-loaded waveguides.  

SciTech Connect (OSTI)

Power extraction using a dielectric-loaded (DL) waveguide is a way to generate high-power radio frequency (RF) waves for future particle accelerators, especially for two-beam-acceleration. In a two-beam-acceleration scheme, a low-energy, high-current particle beam is passed through a deceleration section of waveguide (decelerator), where the power from the beam is partially transferred to trailing electromagnetic waves (wakefields); then with a properly designed RF output coupler, the power generated in the decelerator is extracted to an output waveguide, where finally the power can be transmitted and used to accelerate another usually high-energy low-current beam. The decelerator, together with the RF output coupler, is called a power extractor. At Argonne Wakefield Accelerator (AWA), we designed a 7.8GHz power extractor with a circular DL waveguide and tested it with single electron bunches and bunch trains. The output RF frequency (7.8GHz) is the sixth harmonic of the operational frequency (1.3GHz) of the electron gun and the linac at AWA. In single bunch excitation, a 1.7ns RF pulse with 30MW of power was generated by a single 66nC electron bunch passing through the decelerator. In subsequent experiments, by employing different splitting-recombining optics for the photoinjector laser, electron bunch trains were generated and thus longer RF pulses could be successfully generated and extracted. In 16-bunch experiments, 10ns and 22ns RF pulses have been generated and extracted; and in 4-bunch experiments, the maximum power generated was 44MW with 40MW extracted. A 26GHz DL power extractor has also been designed to test this technique in the millimeter-wave range. A power level of 148MW is expected to be generated by a bunch train with a bunch spacing of 769ps and bunch charges of 20nC each. The arrangement for the experiment is illustrated in a diagram. Higher-order-mode (HOM) power extraction has also been explored in a dual-frequency design. By using a bunch train with a bunch spacing of 769ps and bunch charges of 50nC each, 90.4MW and 8.68MW of extracted power levels are expected to be reached at 20.8GHz and 35.1GHz, respectively. In order to improve efficiency in HOM power extraction, a novel technique has been proposed to suppress unintended modes.

Gao, F.; High Energy Physics; Illinois Inst. of Tech

2009-07-24T23:59:59.000Z

214

Optimisation based design of a district energy system for an eco-town in the United Kingdom  

Science Journals Connector (OSTI)

The reduction of CO2 emissions linked with human activities (mainly energy services and transport), together with the increased use of renewable energies, remain high priorities on various political agendas. However, considering the increased consumption of energy services (especially electricity), and the stochastic nature of some of the most promising renewable energies (wind for instance), the challenge is to find the optimal mix of technologies that will provide the energy services, without increasing the CO2 emissions, but nonetheless ensuring reliability of supply. The focus of this paper is to present the DESDOP tool, based on mixed integer linear optimisation technics, that helps giving insight in the optimal mix of technologies that will simultaneously help decrease the emissions while at the same time guarantee resilience of supply. The results show that while it is not yet possible to avoid electricity from the grid completely (hence nuclear or fossil fuel), CO2 reductions up to 20%, at no extra costs compared to the business-as-usual case, are easily achievable.

C. Weber; N. Shah

2011-01-01T23:59:59.000Z

215

Generation of synthetic benchmark electrical load profiles using publicly available load and weather data  

Science Journals Connector (OSTI)

Abstract Electrical load profiles of a particular region are usually required in order to study the performance of renewable energy technologies and the impact of different operational strategies on the power grid. Load profiles are generally constructed based on measurements and load research surveys which are capital and labour-intensive. In the absence of true load profiles, synthetically generated load profiles can be a viable alternative to be used as benchmarks for research or renewable energy investment planning. In this paper, the feasibility of using publicly available load and weather data to generate synthetic load profiles is investigated. An artificial neural network (ANN) based method is proposed to synthesize load profiles for a target region using its typical meteorological year 2 (TMY2) weather data as the input. To achieve this, the proposed ANN models are first trained using TMY2 weather data and load profile data of neighbouring regions as the input and targeted output. The limited number of data points in the load profile dataset and the consequent averaging of TMY2 weather data to match its period resulted in limited data availability for training. This challenge was tackled by incorporating generalization using Bayesian regularization into training. The other major challenge was facilitating ANN extrapolation and this was accomplished by the incorporation of domain knowledge into the input weather data for training. The performance of the proposed technique has been evaluated by simulation studies and tested on three real datasets. Results indicate that the generated synthetic load profiles closely resemble the real ones and therefore can be used as benchmarks.

Gobind G. Pillai; Ghanim A. Putrus; Nicola M. Pearsall

2014-01-01T23:59:59.000Z

216

Characterization of Rivastigmine Loaded Chitosan  

E-Print Network [OSTI]

cholinesterase inhibitors (ChEI). In present study rivastigmine loaded chitosan-tripolyphosphate nanoparticles

Simar Preet Kaur; Rekha Rao; Afzal Hussain; Sarita Khatkar

217

Bridge Monitoring and Loading  

E-Print Network [OSTI]

#12;1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling simulations were conducted for a range of stone arch bridges spanning 5.0m to 32m. Traditional assessment procedures for the determination of both longitudinal and transverse bridge strengths were developed

218

Bridge Monitoring and Loading  

E-Print Network [OSTI]

1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling and Assessment dimensional non- linear finite element simulations of a range of stone arch- bridges spanning 5.0m to 32m and novel assessment proce- dures for the determination of both longitudinal andtrans- verse bridge

219

Load Management Made Simple  

E-Print Network [OSTI]

Company have moved to a demand side or load management mode which seeks to influence customers to change electric usage patterns to more efficiently use available generating capacity. Since 1970, the TUEC system peak demand has more than doubled from about...

Schneider, K.

1985-01-01T23:59:59.000Z

220

Experience in operating and upgrading the No. 5 unit of the Novovoronezh nuclear power plant – practical base for developing a reliable source of nuclear energy  

Science Journals Connector (OSTI)

The No. 5 unit of the Novovoronezh nuclear power plant, starting commercial operations on September 26, 1980, is the first power-generating unit with a 1000 MW VVER in our country. The assimilation of its power g...

I. L. Vitkovskii

2011-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

United Telecoms Ltd | Open Energy Information  

Open Energy Info (EERE)

Telecoms Ltd Telecoms Ltd Jump to: navigation, search Name United Telecoms Ltd. Place Bangalore, Karnataka, India Zip 560 048 Sector Solar Product Bangalore-based firm involved in etting up telecom networks, e-governance networks and solutions including transport sector. The firm is also setting up solar project. Coordinates 12.97092°, 77.60482° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":12.97092,"lon":77.60482,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

222

PO. 254 Control of Power Train Loads  

E-Print Network [OSTI]

Abstract summary Variable loads along the power train are the primary cause attributed to the failure of gears, bearings, and other mechanical components. The concept of anticipatory control applied to a wind power train is presented. This new approach to power train load management is based on the data reflecting the current status of the power train. The model driving the optimization of the power train loads considers four different objectives, including minimization of the torque variability and power maximization. A software tool for power train load management is presented. This new approach to power train load control is based on the data reflecting the current status of the power train. Such data is collected by a typical SCADA system. The model driving the optimization of the power train loads considers four different objectives, including minimization of the torque variability and power maximization. Details of the model that is applicable to different turbines are presented Objectives Goal: Transform a wind a farm into a wind power plant Example objectives: ? Minimization of the torque ramp rate ? Maximization of the power produced ? Maximization of the power quality Modify the shape of the power curve Methods Data mining/Knowledge discovery

Andrew Kusiak

223

recreate load le Rick Whitman  

E-Print Network [OSTI]

is an example of an initial unexpanded fos load le. It loads data for the le: u-init-y.cy0 u data for the le: e-init-y.cy0 2 #12;e-next-y.lod - this is an expanded fos load which uses erecreate load le Rick Whitman November 27, 1996 Usage The tool is invoked by entering recreate load

Sirianni, Marco

224

Dehumidification and cooling loads from ventilation air  

SciTech Connect (OSTI)

The importance of controlling humidity in buildings is cause for concern, in part, because of indoor air quality problems associated with excess moisture in air-conditioning systems. But more universally, the need for ventilation air has forced HVAC equipment (originally optimized for high efficiency in removing sensible heat loads) to remove high moisture loads. To assist cooling equipment and meet the challenge of larger ventilation loads, several technologies have succeeded in commercial buildings. Newer technologies such as subcool/reheat and heat pipe reheat show promise. These increase latent capacity of cooling-based systems by reducing their sensible capacity. Also, desiccant wheels have traditionally provided deeper-drying capacity by using thermal energy in place of electrical power to remove the latent load. Regardless of what mix of technologies is best for a particular application, there is a need for a more effective way of thinking about the cooling loads created by ventilation air. It is clear from the literature that all-too-frequently, HVAC systems do not perform well unless the ventilation air loads have been effectively addressed at the original design stage. This article proposes an engineering shorthand, an annual load index for ventilation air. This index will aid in the complex process of improving the ability of HVAC systems to deal efficiently with the amount of fresh air the industry has deemed useful for maintaining comfort in buildings. Examination of typical behavior of weather shows that latent loads usually exceed sensible loads in ventilation air by at least 3:1 and often as much as 8:1. A designer can use the engineering shorthand indexes presented to quickly assess the importance of this fact for a given system design. To size those components after they are selected, the designer can refer to Chapter 24 of the 1997 ASHRAE Handbook--Fundamentals, which includes separate values for peak moisture and peak temperature.

Harriman, L.G. III [Mason-Grant, Portsmouth, NH (United States); Plager, D. [Quantitative Decision Support, Portsmouth, NH (United States); Kosar, D. [Gas Research Inst., Chicago, IL (United States)

1997-11-01T23:59:59.000Z

225

Miscellaneous and Electronic Loads Energy Efficiency Opportunities for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Miscellaneous and Electronic Loads Energy Efficiency Opportunities for Miscellaneous and Electronic Loads Energy Efficiency Opportunities for Commercial Buildings: A Collaborative Study by the United States and India Title Miscellaneous and Electronic Loads Energy Efficiency Opportunities for Commercial Buildings: A Collaborative Study by the United States and India Publication Type Report Refereed Designation Unknown LBNL Report Number LBNL-6287E Year of Publication 2013 Authors Ghatikar, Girish, Iris H. Y. Cheung, and Steven Lanzisera Secondary Authors Wardell, Bob, Manoj Deshpande, Jayraj Ugarkar, and Infosys Technologies Limited Date Published 04/2013 Keywords Electronic loads, energy efficiency opportunities for commercial buildings Short Title MELs Refereed Designation Unknown Attachment Size PDF 1.44 MB Google Scholar BibTex

226

Two 3D networks based on sandwich-type polyoxometalate units linked by Sr-O clusters: Synthesis, structure, and magnetic property  

SciTech Connect (OSTI)

Two 3D hybrid sandwich-type polyoxometalates, [{l_brace}Sr(H{sub 2}O){sub 5}Sr(H{sub 2}O){sub 6}Sr{sub 0.5}(H{sub 2}O){sub 7{r_brace}2}Mn{sub 4}(H{sub 2}O){sub 2}({alpha}-PW{sub 9}O{sub 34}){sub 2}].6H{sub 2}O (1) and [{l_brace}Sr(H{sub 2}O){sub 6}[Sr(H{sub 2}O){sub 8}]{sub 2}Sr(H{sub 2}O){sub 4{r_brace}2}Mn{sub 4}(H{sub 2}O){sub 2}({alpha}{beta}{beta}{alpha}-P{sub 2}W{sub 15}O{sub 56}){sub 2}].5H{sub 2}O (2), have been obtained by the routine synthetic reactions in aqueous solution and characterized by IR, elemental analysis, thermal analysis, and X-ray single-crystal diffraction. The 3D hybrid framework of 1 and 2 are built by tetra-Mn{sup II} substituted sandwich-type polyoxotungstates modified by fourteen Sr(H{sub 2}O){sub x} (x=4-8) units acting as bridges, forming centrosymmetric sandwich structures. The magnetic property of compound 1 has been studied by measuring its magnetic susceptibility in the temperature range of 2-300 K, which indicates predominant ferromagnetic interactions between the Mn{sup II}-O-Mn{sup II} bridge unit. Additionally, the electrochemical behaviours have been detected on solid bulk modified carbon paste electrodes of compounds (CPEs) and three redox couples are detected. - Graphical abstract: Two compounds based on Keggin(a) and Wells-Dawson(b) polyoxometalates modified by 14 Sr-O clusters.

Yu Yang [Key Laboratory of Materials Physics and Chemistry, Colleges of Heilongjiang Province, Harbin Normal University, Harbin 150080 (China); Heilongjiang Beikai Professional and Technology College, Harbin 150317 (China); Zhou Baibin, E-mail: zhou_bai_bin@163.co [Key Laboratory of Materials Physics and Chemistry, Colleges of Heilongjiang Province, Harbin Normal University, Harbin 150080 (China) and Department of Applied Chemistry, Harbin Institute of Technology, Harbin 150001 (China); Yu Kai [Key Laboratory of Materials Physics and Chemistry, Colleges of Heilongjiang Province, Harbin Normal University, Harbin 150080 (China); Department of Applied Chemistry, Harbin Institute of Technology, Harbin 150001 (China); Zhang Yunan [Department of Applied Chemistry, Harbin Institute of Technology, Harbin 150001 (China)

2010-08-15T23:59:59.000Z

227

A review of potential turbine technology options for improving the off-design performance of direct coal-fired gas turbines in base load service  

SciTech Connect (OSTI)

The January, 1988 draft topical report, entitled An Assessment of Off-Design Particle Control Performance on Direct Coal-Fired Gas Turbine Systems'' (Ref.1.1), identified the need to assess potential trade-offs in turbine aerodynamic and thermodynamic design which may offer improvements in the performance, operational and maintenance characteristics of open-cycle, direct coal-fired, combustion gas turbines. In this second of a series of three topical reports, an assessment of the technical options posed by the above trade-offs is presented. The assessment is based on the current status of gas turbine technology. Several industry and university experts were contacted to contribute to the study. Literature sources and theoretical considerations are used only to provide additional background and insight to the technology involved.

Thomas, R.L.

1988-03-01T23:59:59.000Z

228

A review of potential turbine technology options for improving the off-design performance of direct coal-fired gas turbines in base load service. Second topical report  

SciTech Connect (OSTI)

The January, 1988 draft topical report, entitled ``An Assessment of Off-Design Particle Control Performance on Direct Coal-Fired Gas Turbine Systems`` [Ref.1.1], identified the need to assess potential trade-offs in turbine aerodynamic and thermodynamic design which may offer improvements in the performance, operational and maintenance characteristics of open-cycle, direct coal-fired, combustion gas turbines. In this second of a series of three topical reports, an assessment of the technical options posed by the above trade-offs is presented. The assessment is based on the current status of gas turbine technology. Several industry and university experts were contacted to contribute to the study. Literature sources and theoretical considerations are used only to provide additional background and insight to the technology involved.

Thomas, R.L.

1988-03-01T23:59:59.000Z

229

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

230

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

231

United States  

Broader source: Energy.gov (indexed) [DOE]

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

232

Generation of a novel 1 km NDVI data set over Canada, the northern United States, and Greenland based on historical AVHRR data  

Science Journals Connector (OSTI)

Time series of the Normalized Difference Vegetation Index (NDVI) derived from satellite observations provide important information on the state of terrestrial vegetation over a wide range of spatiotemporal scales. For understanding long-term changes in terrestrial ecosystems (post-1981), data collected by the Advanced Very High Resolution Radiometer (AVHRR) on board the satellites of National Oceanic and Atmospheric Administration (NOAA) series is a unique source of information. In this paper, we describe a new processing methodology for a comprehensive AVHRR data set at 1 km spatial resolution acquired over Canada, the northern United States and Greenland post-1981. The methodology incorporates a pre-processing algorithm, Canadian AVHRR Processing System (CAPS), recently developed by the Canada Centre of Remote Sensing (CCRS), which enables highly accurate geolocation and ortho-rectification at efficiency rates of > 90%. Once image navigation is completed, our approach consists of five key steps: first, two clear-sky composites for each 10 day interval are generated from the forward or backward scattering hemisphere; second, AVHRR Channel 1 and 2 reflectances are normalized to the AVHRR/3 on board NOAA-17 to account for differences in the spectral response function among the AVHRR sensors; third, atmospheric correction is performed using the Simplified Method for Atmospheric correction (SMAC) algorithm, using standard meteorological data sets (water vapor, surface level air pressure, ozone); fourth, NDVI is calculated based on atmospherically corrected Channel 1 and 2 reflectances; and finally, the NDVI is adjusted for directional effects based on the Ross-Thick Li-Sparse Bidirectional Reflectance Distribution Function (BRDF) model. The processed NDVI data are compared to an equivalent spatially and temporally overlapping MODIS NDVI data set from 2001 to 2005 for validation. Results at continental scale indicate that time series of MODIS and AVHRR were similar for a wide range of biomes and generalized ecoregions. Analysis stratified by land cover indicated that the correlation was strongest for homogeneous land cover types, such as cropland, when compared to structurally more diverse classes, such as deciduous broadleaf forests. The comparison of the NDVI at the local scale at seven sites of the Fluxnet Canada Research Network resulted in the correlation coefficient r = 0.95. Given confidence in the processing approach, this NDVI data set can be a valuable source of information for climate and vegetation-related studies over Canada and the northern United States.

Fabio M.A. Fontana; Nicholas C. Coops; Konstantin V. Khlopenkov; Alexander P. Trishchenko; Michael Riffler; Michael A. Wulder

2012-01-01T23:59:59.000Z

233

Unit Cost Natural Gas | OpenEI  

Open Energy Info (EERE)

2 2 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142281532 Varnish cache server Unit Cost Natural Gas Dataset Summary Description Provides annual energy usage for years 1989 through 2010 for UT at Austin; specifically, electricity usage (kWh), natural gas usage (Mcf), associated costs. Also provides water consumption for 2005 through 2010. Source University of Texas (UT) at Austin, Utilities & Energy Management Date Released Unknown Date Updated Unknown Keywords Electricity Consumption Natural Gas Texas Unit Cost Electricity Unit Cost Natural Gas University Water Data application/vnd.ms-excel icon Energy and Water Use Data for UT-Austin (xls, 32.8 KiB) Quality Metrics

234

Unit Cost Electricity | OpenEI  

Open Energy Info (EERE)

8 8 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142281518 Varnish cache server Unit Cost Electricity Dataset Summary Description Provides annual energy usage for years 1989 through 2010 for UT at Austin; specifically, electricity usage (kWh), natural gas usage (Mcf), associated costs. Also provides water consumption for 2005 through 2010. Source University of Texas (UT) at Austin, Utilities & Energy Management Date Released Unknown Date Updated Unknown Keywords Electricity Consumption Natural Gas Texas Unit Cost Electricity Unit Cost Natural Gas University Water Data application/vnd.ms-excel icon Energy and Water Use Data for UT-Austin (xls, 32.8 KiB) Quality Metrics

235

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2009 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC",...

236

,"Table 2b. Noncoincident Winter Peak Load, Actual and Projected...  

U.S. Energy Information Administration (EIA) Indexed Site

and 2007 Base Year)" ,"Winter Noncoincident Peak Load",,"Contiguous U.S. ","Eastern Power Grid",,,,,,"Texas Power Grid","Western Power Grid" ,"Projected Year Base","Year",,"FRCC",...

237

United States  

Broader source: Energy.gov (indexed) [DOE]

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

238

APS high heat load monochromator  

SciTech Connect (OSTI)

This document contains the design specifications of the APS high heat load (HHL) monochromator and associated accessories as of February 1993. It should be noted that work is continuing on many parts of the monochromator including the mechanical design, crystal cooling designs, etc. Where appropriate, we have tried to add supporting documentation, references to published papers, and calculations from which we based our decisions. The underlying philosophy behind performance specifications of this monochromator was to fabricate a device that would be useful to as many APS users as possible, that is, the design should be as generic as possible. In other words, we believe that this design will be capable of operating on both bending magnet and ID beamlines (with the appropriate changes to the cooling and crystals) with both flat and inclined crystal geometries and with a variety of coolants. It was strongly felt that this monochromator should have good energy scanning capabilities over the classical energy range of about 4 to 20 keywith Si (111) crystals. For this reason, a design incorporating one rotation stage to drive both the first and second crystals was considered most promising. Separate rotary stages for the first and second crystals can sometimes provide more flexibility in their capacities to carry heavy loads (for heavily cooled first crystals or sagittal benders of second crystals), but their tuning capabilities were considered inferior to the single axis approach.

Lee, W.K.; Mills, D.

1993-02-01T23:59:59.000Z

239

Load Management: Opportunity or Calamity?  

E-Print Network [OSTI]

larger now than prior to 1973. Utilities are examining two options which can be termed load management. One option is to control discretionary loads during peak periods. Cycling of residential water heaters or shutting off industrial electric furnaces...

Males, R.; Hassig, N.

1981-01-01T23:59:59.000Z

240

Contribution of Peaks of Virus Load to Simian Immunodeficiency Virus Pathogenesis  

Science Journals Connector (OSTI)

...late peak in virus load. This indicates...the statistical power of this argument...measures the virus load exactly at its...underestimated in virus load data. We studied whether...higher statistical power than model 2...based on the same data (26). However...relation between virus load in plasma and survival...

Roland R. Regoes; Silvija I. Staprans; Mark B. Feinberg; Sebastian Bonhoeffer

2002-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

A Scientific Trigger Unit for Space-Based Real-Time Gamma Ray Burst Detection, I - Scientific Software Model and Simulations  

E-Print Network [OSTI]

The on-board Scientific Trigger Unit (UTS) is designed to detect Gamma Ray Bursts (GRBs) in real-time, using the data produced by the ECLAIRs camera, foreseen to equip the future French-Chinese satellite mission SVOM (Space-based Variable Objects Monitor). The UTS produces GRB alerts, sent to the ground for GRB follow-up observations, and requests the spacecraft slew to repoint its narrow field instruments onto the GRB afterglow. Because of the diversity of GRBs in duration and variability, two simultaneously running GRB trigger algorithms are implemented in the UTS, the so called Image Trigger performing systematic sky image reconstruction on time scales above 20 s, and the Count-Rate Trigger, selecting a time scale from 10 ms to 20 s showing an excess in count-rate over background estimate, prior to imaging the excess for localization on the sky. This paper describes both trigger algorithms and their implementation in a library, compiled for the Scientific Software Model (SSM) running on standard Linux mach...

Schanne, Stéphane; Kestener, Pierre; Gros, Aleksandra; Cortial, Marin; Götz, Diego; Sizun, Patrick; Château, Frédéric; Cordier, Bertrand

2014-01-01T23:59:59.000Z

242

Assessment of Gasification-Based Biorefining at Kraft Pulp and Paper Mills in the United States, Part A: Background and Assumptions  

SciTech Connect (OSTI)

Commercialization of black liquor and biomass gasification technologies is anticipated in the 2010-2015 time frame, and synthesis gas from gasifiers can be converted into liquid fuels using catalytic synthesis technologies that are already commercially established in the gas-to-liquids or coal-to-liquids industries. This set of two papers describes key results from a major assessment of the prospective energy, environmental, and financial performance of commercial gasification-based biorefineries integrated with kraft pulp and paper mills [1]. Seven detailed biorefinery designs were developed for a reference mill in the southeastern United States, together with the associated mass/energy balances, air emissions estimates, and capital investment requirements. The biorefineries provide chemical recovery services and co-produce process steam for the mill, some electricity, and one of three liquid fuels: a Fischer-Tropsch synthetic crude oil (which could be refined to vehicle fuels at an existing petroleum refinery), dimethyl ether (a diesel engine fuel or propane substitute), or an ethanol-rich mixed-alcohol product. This paper describes the key assumptions that underlie the biorefinery designs. Part B will present analytical results.

Larson, E. D.; Consonni, S.; Katofsky, R. E.; Iisa, K.; Frederick, W. J., Jr.

2008-11-01T23:59:59.000Z

243

United States  

Broader source: Energy.gov (indexed) [DOE]

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

244

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

245

United States  

Broader source: Energy.gov (indexed) [DOE]

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

246

Variable loading roller  

DOE Patents [OSTI]

An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

Williams, D.M.

1988-01-21T23:59:59.000Z

247

United Energy | Open Energy Information  

Open Energy Info (EERE)

United Energy United Energy Name United Energy Address 284, Old Deal Rd Place Eatontown, New Jersey Zip 07722 Sector Solar Product Energy Efficiency, Renewable Energy Year founded 2009 Number of employees 1-10 Phone number 201-697-8770 Website http://www.unitedenergypro.com Coordinates 40.2785975°, -74.0359722° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2785975,"lon":-74.0359722,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

248

Home Energy Score API User: United Illuminating Company and Connecticut Light and Power  

Broader source: Energy.gov [DOE]

The United Illuminating Company and Connecticut Light and Power, administering conservation, and load management programs funded by the Connecticut Energy Efficiency Fund, are Home Energy Score...

249

United States  

Broader source: Energy.gov (indexed) [DOE]

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

250

United States  

Broader source: Energy.gov (indexed) [DOE]

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

251

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

252

United States  

Broader source: Energy.gov (indexed) [DOE]

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

253

United States  

Broader source: Energy.gov (indexed) [DOE]

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

254

INVESTING IN NEW BASE LOAD GENERATING CAPACITY  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

game for investments in new regulated generating plants (e.g. as Florida is doing) * Fish or cut bait on wholesale and retail competition * Facilitate utility and IPP mergers...

255

MTS Table Top Load frame  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MTS Table Top Load frame MTS Table Top Load frame The Non-destructive Evaluation group operates an MTS Table Top Load frame for ultimate strength and life cycle testing of various ceramic, ceramic-matrix (FGI), carbon, carbon fiber, cermet (CMC) and metal alloy engineering samples. The load frame is a servo-hydraulic type designed to function in a closed loop configuration under computer control. The system can perform non-cyclic, tension, compression and flexure testing and cyclic fatigue tests. The system is comprised of two parts: * The Load Frame and * The Control System. Load Frame The Load Frame (figure 1) is a cross-head assembly which includes a single moving grip, a stationary grip and LVDT position sensor. It can generate up to 25 kN (5.5 kip) of force in the sample under test and can

256

Measured Peak Equipment Loads in Laboratories  

E-Print Network [OSTI]

of measured equipment load data for laboratories, designersmeasured peak equipment load data from 39 laboratory spacesmeasured equipment load data from various laboratory spaces

Mathew, Paul A.

2008-01-01T23:59:59.000Z

257

Termination unit  

DOE Patents [OSTI]

This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

2014-01-07T23:59:59.000Z

258

A Long-Term Hydrologically Based Dataset of Land Surface Fluxes and States for the Conterminous United States: Update and Extensions  

Science Journals Connector (OSTI)

This paper describes a publicly available, long-term (1915–2011), hydrologically consistent dataset for the conterminous United States, intended to aid in studies of water and energy exchanges at the land surface. These data are gridded at a ...

Ben Livneh; Eric A. Rosenberg; Chiyu Lin; Bart Nijssen; Vimal Mishra; Kostas M. Andreadis; Edwin P. Maurer; Dennis P. Lettenmaier

2013-12-01T23:59:59.000Z

259

ELECTRICAL ENGINEERING IN THE UNITED STATES  

Science Journals Connector (OSTI)

... transformer losses, extensive application of corrective capacitors, surveys of thermal margins of apparatus, unit substations, step regulators, improved cables, etc. Change and uncertainty of location of defence loads ... the provision of spares for emergencies, have more recently prompted a considerable adoption of portable substations and capacitor banks.

1942-07-04T23:59:59.000Z

260

Demand Response: Load Management Programs  

E-Print Network [OSTI]

CenterPoint Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint Commercial Program IV. CenterPoint Residential Programs... V. Residential Discussion Points Demand Response Definition of load management per energy efficiency rule 25.181: ? Load control activities that result in a reduction in peak demand, or a shifting of energy usage from a peak to an off...

Simon, J.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

United States  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Protection and Indoor Air EPA/540-R-00-006 Agency Office of Solid Waste and PB2000 963306 Emergency Response October 2000 Washington, DC 20460 ORIA / Superfund Soil Screening Guidance for Radionuclides: Technical Background Document Publication 9355.4-16 October 2000 Soil Screening Guidance for Radionuclides: Technical Background Document Office of Radiation and Indoor Air Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 ii DISCLAIMER Notice: The Soil Screening Guidance for Radionuclides is based on policies set out in the Preamble to the Final Rule of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), which was published on March 8, 1990 (55 Federal Register 8666). This guidance document sets forth recommended approaches based on EPA's best thinking to date with respect to soil

262

Continuous Price Regulation to Form the Desired Load Schedule of a Power System  

Science Journals Connector (OSTI)

A price control mechanism is designed to form the ... for a power system. A method of price computation with regard for the fuel consumption of generating units and load types...

G. G. Grebenyuk; M. M. Solov'ev

2004-05-01T23:59:59.000Z

263

Review of Residential Low-Load HVAC Systems  

SciTech Connect (OSTI)

In support of the U.S. Department of Energy’s (DOE’s) Building America Program, Pacific Northwest National Laboratory (PNNL) conducted an investigation to inventory commercially available HVAC technologies that are being installed in low-load homes. The first step in this investigation was to conduct a review of published literature to identify low-load HVAC technologies available in the United States and abroad, and document the findings of existing case studies that have evaluated the performance of the identified technologies. This report presents the findings of the literature review, identifies gaps in the literature or technical understanding that must be addressed before low-load HVAC technologies can be fully evaluated, and introduces PNNL’s planned research and analysis for this project to address identified gaps and potential future work on residential low-load HVAC systems.

Brown, Scott A.; Thornton, Brian; Widder, Sarah H.

2013-09-01T23:59:59.000Z

264

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

at PSE is to collect load data for validating dynamic and approach decomposes recorded load data into different load “to continuously record load data for a selected time period

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

265

High-Power Rf Load  

DOE Patents [OSTI]

A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

1998-09-01T23:59:59.000Z

266

End-Use Load and Consumer Assessment Program: Analysis of residential refrigerator/freezer performance  

SciTech Connect (OSTI)

The Bonneville Power Administration (Bonneville) is conducting a large end-use data acquisition program in an effort to understand how energy is utilized in buildings with permanent electric space heating equipment in the Pacific Northwest. The initial portion of effort, known as the End-Use Load and Consumer Assessment Program (ELCAP), was conducted for Bonneville by the Pacific Northwest Laboratory (PNL). The collection of detailed end-use data provided an opportunity to analyze the amount of energy consumed by both refrigerators and separate freezers units located in residential buildings. By obtaining this information, the uncertainty of long- term regional end-use forecasting can be improved and potential utility marketing programs for new appliances with a reduced overall energy demand can be identified. It was found that standby loads derived from hourly averages between 4 a.m. and 5 a.m. reflected the minimum consumption needed to maintain interior refrigerator temperatures at a steady-state condition. Next, an average 24-hour consumption that included cooling loads from door openings and cooling food items was also determined. Later, analyses were conducted to develop a model capable of predicting refrigerator standby loads and 24-hour consumption for comparison with national refrigerator label ratings. Data for 140 residential sites with a refrigeration end-use were screened to develop a sample of 119 residences with pure refrigeration for use in this analysis. To identify those refrigerators that were considered to be pure (having no other devices present on the circuit) in terms of their end-use classification, the screening procedure used a statistical clustering technique that was based on standby loads with 24-hour consumption. 5 refs., 18 figs., 4 tabs.

Ross, B.A.

1991-09-01T23:59:59.000Z

267

Online Load Balancing for Related Machines  

E-Print Network [OSTI]

of entire schedule s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easyOn­line Load Balancing for Related Machines Piotr Berman \\Lambda Moses Charikar y Marek Karpinski z­line load balancing was studied extensively over the years (cf., e.g., [7], [3], [4], and [2

Karpinski, Marek

268

Application of Classification Methods for Forecasting Mid-Term Power Load Patterns  

Science Journals Connector (OSTI)

Currently an automated methodology based on data mining techniques is presented for the prediction of customer load patterns in long duration load profiles. The proposed approach in this paper...i) data preproces...

Minghao Piao; Heon Gyu Lee; Jin Hyoung Park…

2008-01-01T23:59:59.000Z

269

Tackling the Photovoltaic Integration Challenge in the Distribution Network with Deferrable Load  

E-Print Network [OSTI]

.g., water heater) as well as ESS (e.g., battery systems) can be used to reduce the reverse energy flowTackling the Photovoltaic Integration Challenge in the Distribution Network with Deferrable Load systems (ESSs) in households. When the energy generated by PV units is greater than the aggregate load

Wong, Vincent

270

Chip fractal geometry and loading characteristics of sinusoidal multi-cutters in hack-sawing process  

Science Journals Connector (OSTI)

This work proposed a sinusoidal-type discrete analytic geometry model and derives sinusoidal serrated chip loading characteristics equation for the simulation of the hack-saw reciprocating mechanism by the cutter analytic geometry. The chip loading with different wavelength units in hack-sawing process are studied. The factors affecting chip loading of unit wave, namely the length of the wavelength, the cutters numbers of unit wavelength, saw blade thickness, the equivalent cutting depth per tooth, the cutting overlap-area ratio per cutter edge, the pitch per each cutter, the cutting overlap-area factor, and the proportional factor of sinusoidal amplitude are investigated. The effects of sinusoidal cutter arrangement on chip loading are simulated by the chip loading equations. It is found that the maximum chip loading is always in the front of the cutters, which is at either the peak or the trough of different phase, while the numbers of wavelength unit is 3, 5, 7 and 40, respectively. The chip loading characteristics depend on the convolution of chip loading function, the cutter order window function and the cutter interval function. The simulated results from the established cutting force model for sinusoidal multi-cutters agree well with the experimental measurements. The wear location and failure types of cutters could be predicted for in hack-sawing process.

J.-J. Junz Wang; Sung-Hua Wu; Rong-Shean Lee

2012-01-01T23:59:59.000Z

271

Compact monolithic capacitive discharge unit  

DOE Patents [OSTI]

A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

2007-06-26T23:59:59.000Z

272

United Oil Company | Open Energy Information  

Open Energy Info (EERE)

Company Jump to: navigation, search Name: United Oil Company Place: Pittsburgh, Pennsylvania Product: Vegetable-Oil producer Biodiesel producer based in Pittsburgh, PA References:...

273

CHAPRA, STEVEN C. Applying phosphorus loading models to ...  

Science Journals Connector (OSTI)

Feb 21, 1978 ... The data so far ob- ... of simple expressions of its nutrient load- .... Chemical data were used to situate the rn. yr-', based on a least-squares fit of.

2000-01-08T23:59:59.000Z

274

Solar generator performance with load matching to water electrolysis  

Science Journals Connector (OSTI)

A 7 W generator, based on monocrystalline silicon solar cells, was directly wired to an electronic load, simulating the current-voltage characteristic of an advanced water electrolyser. System performance was ...

K. Freudenberg

1982-08-01T23:59:59.000Z

275

Performance of Geogrid Reinforced Ballast under Dynamic Loading  

E-Print Network [OSTI]

Railroad ballast consists of open graded crushed stone used as a bed for railroad track to provide stability. It plays a significant role in providing support for the track base and distributing the load to the weaker ...

Jowkar, Milad

2011-12-31T23:59:59.000Z

276

United States Government  

Broader source: Energy.gov (indexed) [DOE]

uv /uu/u* ±.u.. J.OJ..L rAA , *. . uv /uu/u* ±.u.. J.OJ..L rAA , *. . 'A4 .. ± OO, I U444 flmI I.j102 ' -f- $I)002 EP<.1 (o-.vu) United States Government Department of Energy memorandum DATE: January 30, 2004 REP.YTO: IG-35 (A03DN039) Audit Report No.: OAS-L-04-10 SUBJECT: Audit of the Safeguards and Security Program at the Rocky Flats Environmental Technology Site To: Frazer Lockhart, Manager, Rocky Flats Field Office INTRODUCTION AND OBJECTIVE Because of the terrorist attacks against the United States on September 11, 2001, the Department of Energy (Department) instituted additional security requirements beyond those already in place for normal security operations. These "Security Conditions" requirements were established by Department Notice 473.8 (Notice). The requirements are based on

277

Microsoft Word - UPDATE 2 - Unit 1.doc  

Broader source: Energy.gov (indexed) [DOE]

2 to: 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 1 Emissions at Maximum and Minimum Loads ENSR Corporation December 20, 2005 Document Number 10350-002-410 (Update 2) December, 2005 1-1 1.0 INTRODUCTION This report describes AERMOD modeling results performed for Unit 1 at Mirant's Potomac River Generating Station. The purpose of these runs was to demonstrate that operation of Unit 1 for 24 hours a day at loads from 35 MW to 88 MW with the use of trona to reduce SO 2 emissions will not cause or contribute to modeled exceedances of the National Ambient Air Quality Standards (NAAQS). Mirant proposes to use trona on an as needed basis to limit SO 2 emissions to less than 0.89 lb/MMBtu

278

Microsoft Word - UPDATE 4 - Unit 4.doc  

Broader source: Energy.gov (indexed) [DOE]

4 to: 4 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 4 Emissions at Maximum and Minimum Loads ENSR Corporation December 23, 2005 Document Number 10350-002-410 (Update 4) December, 2005 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for Unit 4 at Mirant's Potomac River Generating Station. The modeling was performed according to the Protocol approved by the Virginia Department of Environmental Quality. The purpose of the modeling was to demonstrate that Unit 4, operating alone under minimum and maximum loads will not cause or contribute to exceedances of the National Ambient Air Quality Standards (NAAQS). Section 2 of this report presents the stack and emission parameters included in the modeling. Section

279

Spring loaded locator pin assembly  

DOE Patents [OSTI]

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

Groll, Todd A. (Idaho Falls, ID); White, James P. (Pocatelo, ID)

1998-01-01T23:59:59.000Z

280

Spring loaded locator pin assembly  

DOE Patents [OSTI]

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

Groll, T.A.; White, J.P.

1998-03-03T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Load Forecasting of Supermarket Refrigeration  

E-Print Network [OSTI]

energy system. Observed refrigeration load and local ambient temperature from a Danish su- permarket renewable energy, is increasing, therefore a flexible energy system is needed. In the present ThesisLoad Forecasting of Supermarket Refrigeration Lisa Buth Rasmussen Kongens Lyngby 2013 M.Sc.-2013

282

United Illuminating | Open Energy Information  

Open Energy Info (EERE)

Illuminating Illuminating Jump to: navigation, search Logo: United Illuminating Name United Illuminating Address 157 Church St Place New Haven, Connecticut Zip 06510 Sector Services Product Green Power Marketer Website http://www.uinet.com/ Coordinates 41.3073289°, -72.9247896° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.3073289,"lon":-72.9247896,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

283

United Nations | Open Energy Information  

Open Energy Info (EERE)

Nations Nations Jump to: navigation, search Logo: United Nations Name United Nations Address UN Headquarters 1st Ave & 46th Street Place New York, NY Zip 10017 Region Northeast - NY NJ CT PA Area Year founded 1945 Website http://www.un.org/ Coordinates 40.7143528°, -74.0059731° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7143528,"lon":-74.0059731,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

284

2003 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared to an expected level of total retail electricity consumption. The forecasted annual energy electricity retail load plus contract obligations are subtracted from the sum of the projected annual energy capability of existing resources and contract purchases to determine whether BPA and/or the region will be surplus or deficit. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Deficits occur when resources are less than loads. Energy deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of a load (i.e., due to economic conditions or closures), additional contract purchases, and/or new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2003 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring. The hydroregulation criteria for this analysis includes: an updated Detailed Operation Plan for Treaty reservoirs for Operating Year (OY) 2004, updated PNCA planning criteria for OY 2003, and revised juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2003 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information regarding marketer contracts is not detailed due to confidentiality agreements. The 2003 White Book analysis updates the December 2002 White Book. This analysis projects the yearly average energy consumption and resource availability

United States. Bonneville Power Administration.

2003-12-01T23:59:59.000Z

285

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Fuels Used and End Uses in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings...

286

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Household Demographics of U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings...

287

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Asked (Apartments in Buildings" "With 5 or More Units)",19.1,5.8,6.2,2.8,2.8,1.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

288

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,4.4,3.7,6.2,4.7 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

289

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,9.6,5,2.2,1.5,0.8 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

290

Building Energy Software Tools Directory: TRACE Load 700  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Load 700 Load 700 TRACE Load 700 logo. Use TRACE Load 700 software - the building and load design modules of TRACE 700, Trane Air Conditioning Economics - to evaluate the effect of building orientation, size, shape, and mass based on hourly weather data and the resulting heat-transfer characteristics of air and moisture. To assure calculation integrity, the program uses algorithms recommended by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE). Choose from eight different ASHRAE cooling and heating methodologies, including the Exact Transfer Function. The program encourages "what if" analyses, allowing the user to enter construction details in any order and then easily change the resulting building model as the design progresses. Multiple project views and "drag-and-drop"

291

Behavior of plate trunnions subjected to shear loads  

SciTech Connect (OSTI)

The use of fabricated trunnions in heavy lift installation of offshore and marine structures is becoming widespread. This paper presents the results of a parametric study, with systematic variation of relevant geometric parameters, on the elasto-plastic responses of plate trunnions subjected to shear loads from the sling eyes. Two distinctive failure modes, associated with main plate dominated and shear plate/trunnion pipe dominated responses are identified and the corresponding results summarized. A proportional limit load, P{sub yl}, is defined for each specimen based on its load-displacement response. It is observed that a plate trunnion possesses significant reserve strength beyond its limit load and that current industry practice, which considers the shear plate only to transfer the total sling load into the main plate, is overly conservative.

Choo, Y.S.; Padmanaban, K.; Shanmugam, N.E.; Liew, J.Y.R. [National Univ. of Singapore (Singapore). Faculty of Engineering

1995-12-31T23:59:59.000Z

292

Breakeven Prices for Photovoltaics on Supermarkets in the United States  

SciTech Connect (OSTI)

The photovoltaic (PV) breakeven price is the PV system price at which the cost of PV-generated electricity equals the cost of electricity purchased from the grid. This point is also called 'grid parity' and can be expressed as dollars per watt ($/W) of installed PV system capacity. Achieving the PV breakeven price depends on many factors, including the solar resource, local electricity prices, customer load profile, PV incentives, and financing. In the United States, where these factors vary substantially across regions, breakeven prices vary substantially across regions as well. In this study, we estimate current and future breakeven prices for PV systems installed on supermarkets in the United States. We also evaluate key drivers of current and future commercial PV breakeven prices by region. The results suggest that breakeven prices for PV systems installed on supermarkets vary significantly across the United States. Non-technical factors -- including electricity rates, rate structures, incentives, and the availability of system financing -- drive break-even prices more than technical factors like solar resource or system orientation. In 2020 (where we assume higher electricity prices and lower PV incentives), under base-case assumptions, we estimate that about 17% of supermarkets will be in utility territories where breakeven conditions exist at a PV system price of $3/W; this increases to 79% at $1.25/W (the DOE SunShot Initiative's commercial PV price target for 2020). These percentages increase to 26% and 91%, respectively, when rate structures favorable to PV are used.

Ong, S.; Clark, N.; Denholm, P.; Margolis, R.

2013-03-01T23:59:59.000Z

293

Geothermal Energy Development in the Eastern United States: Technical assistance report No. 6 geothermal space heating and airconditioning -- McGuire Air Force Base, New Jersey  

SciTech Connect (OSTI)

A method of utilizing the geothermal (66 F) water resource for space heating and cooling of 200 of the 1452 housing units at McGuire AFB is suggested. Using projections of future costs of gas, coal and electricity made by DOD and by industry (Westinghouse), the relative costs of the geothermal-water-plus-heat-pump system and the otherwise-planned central gas heating (to be converted to coal in 1984) and air-conditioning (using individual electric units) system are compared. For heating with the geothermal/heat-pump system, an outlet temperature of 130 F is selected, requiring a longer running time than the conventional system (at 180 F) but permitting a COP (coefficient of performance) of the heat pump of about 3.4. For cooling (obtained in this study by changing directions of water flow, not refrigerant cycles), the change in temperature is less, and a COP near 4.5 is obtained. The cost of cooling in the summer months would be significantly less than the cost of using individual electric air-conditioners. Thus, by using nonreversible heat pumps, geothermal water is used to heat and to cool a section of the housing compound, minimizing operating expenditures. It is estimated that, to drill 1000 ft deep production and reinjection wells and to install ten heat pumps, heat exchangers and piping, would require a capital outlay of $643 K. This cost would replace the capital cost of purchasing and installing 200 air-conditioning units and 14% of the cost of the future coal-fired central heating system (which would otherwise serve all 1452 housing units at McGuire). The net additional capital outlay would be $299 K, which could be amortized in 10 years by the lower operating cost of the geothermal system if electricity and coal prices escalate as industry suggests. If the coal and electricity costs rise at the more modest rates that DOD projects, the capital costs would be amortized in a 15 year period.

Hill, F.K.; Briesen R. von

1980-12-01T23:59:59.000Z

294

54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy |  

Broader source: Energy.gov (indexed) [DOE]

54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy 54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy 54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy December 4, 2012 - 12:06pm Addthis Lightweight materials, such as high-strength steel, aluminum, magnesium and carbon fiber can help improve fuel economy in future vehicles. This is a carbon fiber from microwave-assisted plasma unit -- a unit that is part of the process to transform precursor fibers into carbon fibers that can be used in vehicles. | Photo courtesy of Oak Ridge National Laboratory. Lightweight materials, such as high-strength steel, aluminum, magnesium and carbon fiber can help improve fuel economy in future vehicles. This is a carbon fiber from microwave-assisted plasma unit -- a unit that is part of the process to transform precursor fibers into carbon fibers that can be

295

Energy Efficiency Indicators for High Electric-Load Buildings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Efficiency Indicators for High Electric-Load Buildings Energy Efficiency Indicators for High Electric-Load Buildings Speaker(s): Bernard Aebischer Date: February 6, 2003 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Kristina LaCommare Energy per unit of floor area is not an adequate indictor for energy efficiency in high electric-load buildings. For two activities, restaurants and computer centres, alternative indicators for energy efficiency are discussed. Prerequisites in order to be able to use these indicators in energy efficiency programmes are discussed. The opportunity of an internationally coordinated research activity is also presented. Since 1999, Dr. Bernard Aebischer has served as a senior scientist at CEPE (Centre for Energy Policy and Economics) of the Swiss Federal Institutes of

296

United Nations Foundation (UNF) | Open Energy Information  

Open Energy Info (EERE)

United Nations Foundation (UNF) United Nations Foundation (UNF) Jump to: navigation, search Logo: United Nations Foundation Name United Nations Foundation Address 1800 Massachusetts Avenue NW, Suite 400 Place Washington, DC Zip 20036 Region Northeast - NY NJ CT PA Area Coordinates 38.90879°, -77.042271° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90879,"lon":-77.042271,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

297

Good Energies (United Kingdom) | Open Energy Information  

Open Energy Info (EERE)

United Kingdom) United Kingdom) Name Good Energies (United Kingdom) Address 2-5 Old Bond Street Place London, United Kingdom Zip W1S 4PD Product Global investor in renewable energy and energy efficiency industries Year founded 2001 Phone number +44 20 7659 3300 Website http://www.goodenergies.com/ Coordinates 51.5083291°, -0.1403335° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.5083291,"lon":-0.1403335,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

298

electric load data | OpenEI Community  

Open Energy Info (EERE)

load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

299

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Bulk System Load  Model in GE PSLF TM for Investigating the a Bulk System Load Model in GE PSLF TM for Investigating thecomposite load model in  the PSLF simulation software; the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

300

Dynamic load measurement on an LPG carrier during voyage  

SciTech Connect (OSTI)

There are few actual ship measurement data showing the propriety of the design loads given by classification societies rules or other relevant rules. Therefore, the authors measured acceleration of ship motion and fluctuating loads on tank supports and chocks of a 75,000 m{sup 3} LPG carrier during her voyage. This paper introduces the subject ship and typical measurement results over about 1.3 years. From the analysis of these data, the authors have made clear the amount of frequency of fluctuating loads during actual navigation and ascertained the propriety of the ship`s design base.

Kamoi, Noriyuki; Taniguchi, Tomokazu; Kiso, Takashi; Kada, Kazuo; Motoi, Tatsuya; Nakamura, Shinichi [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

1994-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A free-piston Stirling engine/linear alternator controls and load interaction test facility  

SciTech Connect (OSTI)

A test facility at LeRC was assembled for evaluating free-piston Stirling engine/linear alternator control options, and interaction with various electrical loads. This facility is based on a 'SPIKE' engine/alternator. The engine/alternator, a multi-purpose load system, a digital computer based load and facility control, and a data acquisition system with both steady-periodic and transient capability are described. Preliminary steady-periodic results are included for several operating modes of a digital AC parasitic load control. Preliminary results on the transient response to switching a resistive AC user load are discussed.

Rauch, J.S.; Kankam, M.D.; Santiago, W.; Madi, F.J.

1992-08-01T23:59:59.000Z

302

Determining Electric Motor Load and Efficiency  

Broader source: Energy.gov [DOE]

To compare the operating costs of an existing standard motor with an appropriately-sized energy-efficient replacement, you need to determine operating hours, efficiency improvement values, and load. Part-load is a term used to describe the actual load served by the motor as compared to the rated full-load capability of the motor. Motor part-loads may be estimated through using input power, amperage, or speed measurements. This fact sheet briefly discusses several load estimation techniques.

303

Influence of loading rate on axially loaded piles in clay  

E-Print Network [OSTI]

, Haas and Saxe Yong and Japp. Arulanandan and Shen 4 ~ ~ ~ ~ ~ ~ 4 5 5 6 6 13 13 21 21 22 22 23 23 24 24 Ladd, Hi11iams, Connell and Edgars Berre and Bjerrum. Stevenson. King Vaid and Campanella. Lacasse. Rigqins. CHAPTER V... of the Gain in Strength versus Shearing Rate Plots 4. Select Regression, PI, LI, W, SO(REF) 76 Cases for 152 Laboratory Tests 5. Collected Data for Pile Load Test Results. 6. Data Set References for Pile Load Tests. Page 14 36 54 61 7. Semi...

Garland Ponce, Enrique Eduardo

2012-06-07T23:59:59.000Z

304

Cooling load design tool for UFAD systems.  

E-Print Network [OSTI]

Underfloor Air Distribution (UFAD) Design Guide. Atlanta:Load Design Tool for Underfloor Air Distribution Systems. ”for design cooling loads in underfloor air distribution (

Bauman, Fred; Schiavon, Stefano; Webster, Tom; Lee, Kwang Ho

2010-01-01T23:59:59.000Z

305

Self-aligning biaxial load frame  

DOE Patents [OSTI]

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed crosshead, and by alignment and linear motion elements of one load assembly relative to the load frame.

Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID)

1994-01-01T23:59:59.000Z

306

Self-aligning biaxial load frame  

DOE Patents [OSTI]

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

1994-01-18T23:59:59.000Z

307

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

308

United Biorefineries Corp UBC | Open Energy Information  

Open Energy Info (EERE)

Biorefineries Corp UBC Biorefineries Corp UBC Jump to: navigation, search Name United Biorefineries Corp (UBC) Place Valencia, California Zip 91354-1532 Sector Biofuels Product California-based technology management company doing commercial physical & biological research. Involved in the project development of an Integrated Biorefinery Complex utilizing algae and cellulosic-based second generation biofuels technology. References United Biorefineries Corp (UBC)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. United Biorefineries Corp (UBC) is a company located in Valencia, California . References ↑ "United Biorefineries Corp (UBC)" Retrieved from "http://en.openei.org/w/index.php?title=United_Biorefineries_Corp_UBC&oldid=352515

309

44-BWR WASTE PACKAGE LOADING CURVE EVALUATION  

SciTech Connect (OSTI)

The objective of this calculation is to evaluate the required minimum burnup as a function of initial boiling water reactor (BWR) assembly enrichment that would permit loading of spent nuclear fuel into the 44 BWR waste package configuration as provided in Attachment IV. This calculation is an application of the methodology presented in ''Disposal Criticality Analysis Methodology Topical Report'' (YMP 2003). The scope of this calculation covers a range of enrichments from 0 through 5.0 weight percent (wt%) U-235, and a burnup range of 0 through 40 GWd/MTU. This activity supports the validation of the use of burnup credit for commercial spent nuclear fuel applications. The intended use of these results will be in establishing BWR waste package configuration loading specifications. Limitations of this evaluation are as follows: (1) The results are based on burnup credit for actinides and selected fission products as proposed in YMP (2003, Table 3-1) and referred to as the ''Principal Isotopes''. Any change to the isotope listing will have a direct impact on the results of this report. (2) The results of 100 percent of the current BWR projected waste stream being able to be disposed of in the 44-BWR waste package with Ni-Gd Alloy absorber plates is contingent upon the referenced waste stream being sufficiently similar to the waste stream received for disposal. (3) The results are based on 1.5 wt% Gd in the Ni-Gd Alloy material and having no tuff inside the waste package. If the Gd loading is reduced or a process to introduce tuff inside the waste package is defined, then this report would need to be reevaluated based on the alternative materials.

J.M. Scaglione

2004-08-25T23:59:59.000Z

310

UNITED STATES OF AMERICA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act, when high stream flows, wind generation, and insufficient load combine to endanger fish protected under Federal environmental law. Complainants challenge Bonneville's...

311

Long-run Implications of a Forest-based Carbon Sequestration Policy on the United States Economy: A Computable General Equilibrium (CGE) Modeling Approach  

E-Print Network [OSTI]

The economic impacts of a government-funded, forest-based sequestration program were analyzed under two different payment schemes. The impacts were obtained by developing a regional, static CGE model built to accommodate a modified IMPLAN SAM for a...

Monge, Juan

2012-10-19T23:59:59.000Z

312

Behavior of Capstone and Honeywell microturbine generators during load changes  

SciTech Connect (OSTI)

This report describes test measurements of the behavior of two microturbine generators (MTGs) under transient conditions. The tests were conducted under three different operating conditions: grid-connect; stand-alone single MTG with load banks; and two MTGs running in parallel with load banks. Tests were conducted with both the Capstone 30-kW and Honeywell Parallon 75-kW MTGs. All tests were conducted at the Southern California Edison /University of California, Irvine (UCI) test facility. In the grid-connected mode, several test runs were conducted with different set-point changes both up and down and a start up and shutdown were recorded for each MTG. For the stand-alone mode, load changes were initiated by changing load-bank values (both watts and VARs). For the parallel mode, tests involved changes in the load-bank settings as well as changes in the power set point of the MTG running in grid-connect mode. Detailed graphs of the test results are presented. It should be noted that these tests were done using a specific hardware and software configuration. Use of different software and hardware could result in different performance characteristics for the same units.

Yinger, Robert J.

2001-07-01T23:59:59.000Z

313

United States Government  

Broader source: Energy.gov (indexed) [DOE]

/18/04 THU 11:31 FAX 423 241 3897 OIG -- /18/04 THU 11:31 FAX 423 241 3897 OIG -- + HQ 1002 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 17, 2004 Audit Report No. OAS-L-04-1 1 REPLY TO IG-36 (A04DN003) ATTN OF: SUBJECT; Audit of "Requests for Equitable Adjustment at the Rocky Flats Environmental Technology Site" TO: Frazer R. Lockhart, Manager, Rocky Flats Project Office INTRODUCTION AND OBJECTIVE Effective February 1, 2000, the Department of Energy's (Department) Rocky Flats Project Office (RFPO) and Kaiser-Hill Co., LLC (Kaiser-Hill), entered into a cost- plus-incentive-fee contract to close the Rocky Flats Environmental Technology Site (Rocky Flats) by December 15, 2006. Under the contract terms, Kaiser-Hlill's final incentive fee earned will be based on how well it meets established cost targets. For

314

United States Government  

Office of Legacy Management (LM)

. v-w. . v-w. ' ;H; (07.901 United States Government 0' ; Td 2, <.<~ Department of Energy ' m e m o randum DATE: REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Alba Craft Laboratory in Oxford, Ohio L. Price, OR TO: The former Alba Craft Laboratory site at lo-14 West Rose Avenue, Oxford, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Dr. and M rs. Gilbert Pacey, of Oxford, Ohio, own the site. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey letter report and the authority review are provided for your information.

315

UNITED STATES GOVERKMENT  

Office of Legacy Management (LM)

Ojice Memornndz~nz 0 Ojice Memornndz~nz 0 UNITED STATES GOVERKMENT By application dated ;!ay 11, 1959, as a~zen:ii:d Hay 25, 1959, the a--T+- I-r-- cant requests that its license SW-33 be amend,ed to authorizt? proced- ures for t>e CCLl-ect conversion of LT6 to '3$ and by applicaticn datzci June 29, 1959, a.3 n:odifizd July 15, 1059, the shipment of uranium rdioxide pellets. Based on our rexiew of the information finished by the applicant, it is hereby determined that the applicant is qualified, by training and experience, to use special nuclear material for the pwpose requested and that the ap@icant's procedures, facilities and equip- ment are adequate to protect health and minimize danger to life and property. It is, therefore, determined that ~NM-33 may be amended to

316

. United States Government  

Office of Legacy Management (LM)

,:n5.5.8 ,:n5.5.8 ,849, EfG pw, . United States Government DATE: AUG 2 i994 y#J;; EM-421 (W. A. Williams, 427-1719) sUBJECT: -Elimination of the Robbins & Myers Site, Springfield, Ohio 11179 I The File TO: I have reviewed the attached elimination recommendation and the original historical records for the Myers & Robbins facility in Springfield, Ohio. I have determined that there is little likelihood of radioactive contamination at these sites. The only record of activity at this site by Department of Energy predecessors is an equipment test of a pump in March 1975. This test involved limited amounts of radioactive materials and there was a serious effort to decontaminate the equipment at the conclusion of the tests. Based on the above, the Myers & Robbins site in Springfield, Ohio, is

317

Uniter+ States Government  

Office of Legacy Management (LM)

EFG (07-90) EFG (07-90) Uniter+ States Government ~L.aQ-i; Department of Energy inemorandum DATE: SEP 2 5 1992 REPLY TO Al-fN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Dow Chemical Company Facility in M a d ison, Illinois TO: L. Price, OR The site of the Former Dow Chemical Company in M a d ison, Illinois, which is currently owned and operated by the Spectrulite Consortium, is designated for inclusion in the Formerly Utilized Sites Remedial Action Program (FUSRAP). This designation is based upon the results of a preliminary radiological survey and other information described in the attached Designation Summary. The authority determination and preliminary survey report also are attached for information. The site has been assigned a low priority under the FUSRAP protocol, as

318

* United States Government  

Office of Legacy Management (LM)

-- -- DE;$r,e /q f-j * I3 - I * United States Government memorandum MAY 21 I991 DATE: REPLY TO Al-fN OF: 4ih55YhL Department of Energy JT:,i 5, f&A 0 ' - j4.~, ' -/ jl.a' \ A t -3 __..-_-. EM-421 SUBJECT: Elimination of the American Potash and Chemical Site The File TO: I have reviewed the attached site summary and elimination recommendation for the American Potash and Chemical Company Site in West Hanover, Massachusetts. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the American Potash and Chemical Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams, PhD Designation and Certification Manager

319

United States Government  

Office of Legacy Management (LM)

OOE F 1325.8 OOE F 1325.8 - EFgzk3) United States Government tiemorandum 0 wt;? -J Department of Energy DATE: SEP 2 5 1992 REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Diamond Magnesium Site in Painesville, Ohio TO: L. Price, OR The former Diamond Magnesium Company site located at 720 Fairport-Nursery Road in Painesville, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The site is owned by Uniroyal Chemical Company and by Lonza Chemical, Incorporated. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey reports and the authority

320

United States Government  

Office of Legacy Management (LM)

ooc F r325.8 ooc F r325.8 imo, EFO ,ww United States Government memorandum Department of Energy -fw?w 81ua DATE: FEB 1 5 1991 l+Ks6 sUsJECT: Elimination of the Buflovak Company Site from FUSRAP ho: The File I have reiiewed the attached preliminary site summary and recommendation for the Buflovak Company site in Buffalo, New York. I have determined that there is little likelihood of contamination at this site. Based on the above, the Buflovak Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment - I . b e e : W e s to n E M - 4 0 ( 3 ) E M - 4 2 ( 2 ) W illiams r

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

System for loading executable code into volatile memory in a downhole tool  

DOE Patents [OSTI]

A system for loading an executable code into volatile memory in a downhole tool string component comprises a surface control unit comprising executable code. An integrated downhole network comprises data transmission elements in communication with the surface control unit and the volatile memory. The executable code, stored in the surface control unit, is not permanently stored in the downhole tool string component. In a preferred embodiment of the present invention, the downhole tool string component comprises boot memory. In another embodiment, the executable code is an operating system executable code. Preferably, the volatile memory comprises random access memory (RAM). A method for loading executable code to volatile memory in a downhole tool string component comprises sending the code from the surface control unit to a processor in the downhole tool string component over the network. A central processing unit writes the executable code in the volatile memory.

Hall, David R. (Provo, UT); Bartholomew, David B. (Springville, UT); Johnson, Monte L. (Orem, UT)

2007-09-25T23:59:59.000Z

322

{Control of Residential Load Management Networks Using Real Time Pricing  

E-Print Network [OSTI]

loads to deliver load following and regulation, withproducts like load following and spinning reserve.following of constant power references. Chapter 7 Implications of Load

Burke, William Jerome

2010-01-01T23:59:59.000Z

323

Superfund record of decision (EPA Region 1): Loring Air Force Base, Operable Units 3, 5, 10, and 11, Limestone, ME, August 21, 1998  

SciTech Connect (OSTI)

The Loring Air Force Base National Priorities List (NPL) Site is located in Aroostook County, Maine. This decision document presents the selected remedial actions for the source areas at the following sites located within OUs 3, 5, 10, and 11 at the Site: OU3 - Explosive Ordnance Disposal (EOD) Range Outdoor Firing Range; OU5 -- Base Exchange Service Station (BXSS); OU10 -- Pumphouse (PH) 8210; PH 8270; Former Solvent Storage Building (FSSB); and OU11 -- Refueling Maintenance Shop Area (RMSA); Vehicle Maintenance Building (VMB); The USAF has evaluated the potential risks to human health and the environment at each of the these sites and developed the site-specific remediation goals for the source areas at each of these sites based on the future land use determinations made in the April 1996 Record of Decision (PB96-963703) for the Disposal of Loring Air Force Base, Maine. Therefore, the No Further CERCLA Action decisions for the source areas at each of these sites is based on the assumption that future land use at each site shall be in accordance with the Disposal ROD (i.e., that real property comprising the site shall be parceled, disposed of, and reused in accordance with the Disposal ROD).

NONE

1999-03-01T23:59:59.000Z

324

Cooling load design tool for UFAD systems.  

E-Print Network [OSTI]

ratio of time between Fan Coil Units Perimeter Zone Linearand underfloor fan coil units. cooling contribution of

Bauman, Fred; Schiavon, Stefano; Webster, Tom; Lee, Kwang Ho

2010-01-01T23:59:59.000Z

325

End of FY10 report - used fuel disposition technical bases and lessons learned : legal and regulatory framework for high-level waste disposition in the United States.  

SciTech Connect (OSTI)

This report examines the current policy, legal, and regulatory framework pertaining to used nuclear fuel and high level waste management in the United States. The goal is to identify potential changes that if made could add flexibility and possibly improve the chances of successfully implementing technical aspects of a nuclear waste policy. Experience suggests that the regulatory framework should be established prior to initiating future repository development. Concerning specifics of the regulatory framework, reasonable expectation as the standard of proof was successfully implemented and could be retained in the future; yet, the current classification system for radioactive waste, including hazardous constituents, warrants reexamination. Whether or not consideration of multiple sites are considered simultaneously in the future, inclusion of mechanisms such as deliberate use of performance assessment to manage site characterization would be wise. Because of experience gained here and abroad, diversity of geologic media is not particularly necessary as a criterion in site selection guidelines for multiple sites. Stepwise development of the repository program that includes flexibility also warrants serious consideration. Furthermore, integration of the waste management system from storage, transportation, and disposition, should be examined and would be facilitated by integration of the legal and regulatory framework. Finally, in order to enhance acceptability of future repository development, the national policy should be cognizant of those policy and technical attributes that enhance initial acceptance, and those policy and technical attributes that maintain and broaden credibility.

Weiner, Ruth F.; Blink, James A. (Lawrence Livermore National Laboratory, Livermore, CA); Rechard, Robert Paul; Perry, Frank (Los Alamos National Laboratory, Los Alamos, NM); Jenkins-Smith, Hank C. (University of Oklahoma, Norman, OK); Carter, Joe (Savannah River Nuclear Solutions, Aiken, SC); Nutt, Mark (Argonne National Laboratory, Argonne, IL); Cotton, Tom (Complex Systems Group, Washington DC)

2010-09-01T23:59:59.000Z

326

Summary of Time Period-Based and Other Approximation Methods for Determining the Capacity Value of Wind and Solar in the United States: September 2010 - February 2012  

SciTech Connect (OSTI)

This paper updates previous work that describes time period-based and other approximation methods for estimating the capacity value of wind power and extends it to include solar power. The paper summarizes various methods presented in utility integrated resource plans, regional transmission organization methodologies, regional stakeholder initiatives, regulatory proceedings, and academic and industry studies. Time period-based approximation methods typically measure the contribution of a wind or solar plant at the time of system peak - sometimes over a period of months or the average of multiple years.

Rogers, J.; Porter, K.

2012-03-01T23:59:59.000Z

327

Building Energy Software Tools Directory: Prophet Load Profiler  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Prophet Load Profiler Prophet Load Profiler Prophet Load Profiler logo. Internet-enabled software that empowers business energy customers to manage energy and reduce costs. Valuable to facility managers, energy managers and energy service companies, the Prophet web-based service delivers real-time and near-real-time energy information on energy consumption and demand for any size facility. A number of facilities can be managed using consumption data gathered in 15 minute, 30 minute, 60 minute, daily, weekly and monthly intervals. Users can immediately view and analyze data with an eye toward load shedding, cost avoidance strategies, energy budget management, utility cost validation and energy forecasting. All tools are contained within the Prophet Web application and enabled via the internet using a standard web

328

Fatigue Loads Estimation Through a Simple Stochastic Model  

E-Print Network [OSTI]

We propose a procedure to estimate the fatigue loads on wind turbines, based in a recent framework used for reconstructing data series of stochastic properties measured at wind turbines. Through a standard fatigue analysis, we show that it is possible to accurately estimate fatigue loads in any wind turbine within one wind park, using only the load measurements at one single turbine and the set of wind speed measurements. Our framework consists of deriving a stochastic differential equation that describes the evolution of the torque at one wind turbine driven by the wind speed. The stochastic equation is derived directly from the measurements and is afterwards used for predicting the fatigue loads at neighboring turbines. Such a framework could be used to mitigate the financial efforts usually necessary for placing measurement devices in all wind turbines within one wind farm. Finally, we also discuss the limitations and possible improvements of the proposed procedure.

Lind, Pedro G; Peinke, Joachim

2014-01-01T23:59:59.000Z

329

Estimating Demand Response Load Impacts: Evaluation of BaselineLoad Models for Non-Residential Buildings in California  

SciTech Connect (OSTI)

Both Federal and California state policymakers areincreasingly interested in developing more standardized and consistentapproaches to estimate and verify the load impacts of demand responseprograms and dynamic pricing tariffs. This study describes a statisticalanalysis of the performance of different models used to calculate thebaseline electric load for commercial buildings participating in ademand-response (DR) program, with emphasis onthe importance of weathereffects. During a DR event, a variety of adjustments may be made tobuilding operation, with the goal of reducing the building peak electricload. In order to determine the actual peak load reduction, an estimateof what the load would have been on the day of the event without any DRactions is needed. This baseline load profile (BLP) is key to accuratelyassessing the load impacts from event-based DR programs and may alsoimpact payment settlements for certain types of DR programs. We testedseven baseline models on a sample of 33 buildings located in California.These models can be loosely categorized into two groups: (1) averagingmethods, which use some linear combination of hourly load values fromprevious days to predict the load on the event, and (2) explicit weathermodels, which use a formula based on local hourly temperature to predictthe load. The models were tested both with and without morningadjustments, which use data from the day of the event to adjust theestimated BLP up or down.Key findings from this study are: - The accuracyof the BLP model currently used by California utilities to estimate loadreductions in several DR programs (i.e., hourly usage in highest 3 out of10 previous days) could be improved substantially if a morning adjustmentfactor were applied for weather-sensitive commercial and institutionalbuildings. - Applying a morning adjustment factor significantly reducesthe bias and improves the accuracy of all BLP models examined in oursample of buildings. - For buildings with low load variability, all BLPmodels perform reasonably well in accuracy. - For customer accounts withhighly variable loads, we found that no BLP model produced satisfactoryresults, although averaging methods perform best in accuracy (but notbias). These types of customers are difficult to characterize withstandard BLP models that rely on historic loads and weather data.Implications of these results for DR program administrators andpolicymakersare: - Most DR programs apply similar DR BLP methods tocommercial and industrial sector customers. The results of our study whencombined with other recent studies (Quantum 2004 and 2006, Buege et al.,2006) suggests that DR program administrators should have flexibility andmultiple options for suggesting the most appropriate BLP method forspecific types of customers.

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote,Sila

2008-01-01T23:59:59.000Z

330

Lithospheric response to volcanic loading by the Canary Islands: constraints from seismic reflection data in their flexural moat  

E-Print Network [OSTI]

Lithospheric response to volcanic loading by the Canary Islands: constraints from seismic reflection data in their flexural moat J. S. Collier1 and A. B. Watts2 1 Department of Earth Sciences suggesting they are the consequence of sediment loading at the Moroccan continental margin. Units III, IV

Watts, A. B. "Tony"

331

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,4.4,1,0.5,0.5,3.4,2.4,0.6,0.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

332

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,2.3,16.8,"N","N","N","N","N","N",2.3,16.8,"N","N" "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

333

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,2,0.7,1.3,2.6,4.1,3.5,2.5,2.4 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

334

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,6.2,3.5,0.5,0.5,1.1,0.6,"Q",0.7,0.4,0.2,2,1.4,0.6 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

335

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Buildings" "With 5 or More Units)",19.1,4.7,0.9,0.4,0.3,"Q",0.6,0.4,"Q",3.8,2.9,0.9 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

336

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,3.7,2.7,0.9,0.6,0.3,0.9,1,0.2,0.6,0.2 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

337

Behavior of Bidirectional Spring Unit in Isolated Floor Systems  

E-Print Network [OSTI]

gravity based sys- tems suspension mechanisms or linear spring based systems coil springs or rubber unitsBehavior of Bidirectional Spring Unit in Isolated Floor Systems Shenlei Cui, M.ASCE1 ; Michel of bidirectional spring units used as isolators in a kind of isolated floor system, three types of characterization

Bruneau, Michel

338

Dynamic simulation and load-following control of an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture  

SciTech Connect (OSTI)

Load-following control of future integrated gasification combined cycle (IGCC) plants with pre-combustion CO{sub 2} capture is expected to be far more challenging as electricity produced by renewable energy is connected to the grid and strict environmental limits become mandatory requirements. To study control performance during load following, a plant-wide dynamic simulation of a coal-fed IGCC plant with CO{sub 2} capture has been developed. The slurry-fed gasifier is a single-stage, downward-fired, oxygen-blown, entrained-flow type with a radiant syngas cooler (RSC). The syngas from the outlet of the RSC goes to a scrubber followed by a two-stage sour shift process with inter-stage cooling. The acid gas removal (AGR) process is a dual-stage physical solvent-based process for selective removal of H{sub 2}S in the first stage and CO{sub 2} in the second stage. Sulfur is recovered using a Claus unit with tail gas recycle to the AGR. The recovered CO{sub 2} is compressed by a split-shaft multistage compressor and sent for sequestration after being treated in an absorber with triethylene glycol for dehydration. The clean syngas is sent to two advanced “F”-class gas turbines (GTs) partially integrated with an elevated-pressure air separation unit. A subcritical steam cycle is used for heat recovery steam generation. A treatment unit for the sour water strips off the acid gases for utilization in the Claus unit. The steady-state model developed in Aspen Plus® is converted to an Aspen Plus Dynamics® simulation and integrated with MATLAB® for control studies. The results from the plant-wide dynamic model are compared qualitatively with the data from a commercial plant having different configuration, operating condition, and feed quality than what has been considered in this work. For load-following control, the GT-lead with gasifier-follow control strategy is considered. A modified proportional–integral–derivative (PID) control is considered for the syngas pressure control. For maintaining the desired CO{sub 2} capture rate while load-following, a linear model predictive controller (LMPC) is implemented in MATLAB®. A combined process and disturbance model is identified by considering a number of model forms and choosing the final model based on an information-theoretic criterion. The performance of the LMPC is found to be superior to the conventional PID control for maintaining CO{sub 2} capture rates in an IGCC power plant while load following.

Bhattacharyya, D,; Turton, R.; Zitney, S.

2012-01-01T23:59:59.000Z

339

Source evaluation report phase 2 investigation: Limited field investigation. Final report: United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska  

SciTech Connect (OSTI)

This report describes the limited field investigation work done to address issues and answer unresolved questions regarding a collection of potential contaminant sources at Eielson Air Force Base (AFB), near Fairbanks, Alaska. These sources were listed in the Eielson AFB Federal Facility Agreement supporting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of the base. The limited field investigation began in 1993 to resolve all remaining technical issues and provide the data and analysis required to evaluate the environmental hazard associated with these sites. The objective of the limited field investigation was to allow the remedial project managers to sort each site into one of three categories: requiring remedial investigation/feasibility study, requiring interim removal action, or requiring no further remedial action.

Not Available

1994-10-01T23:59:59.000Z

340

Macro Data Load: An Efficient Mechanism for Enhancing Loaded Data Reuse  

E-Print Network [OSTI]

Macro Data Load: An Efficient Mechanism for Enhancing Loaded Data Reuse Lei Jin and Sangyeun Cho, Member, IEEE Abstract--This paper presents a study on macro data load, a novel mechanism to increase the amount of loaded data reuse within a processor. A macro data load brings into the processor a maximum

Cho, Sangyeun

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Short-term electricity dispatch optimization of Ertan hydropower plant based on data by field tests  

Science Journals Connector (OSTI)

A short-term electricity dispatch optimization program required by the Ertan hydropower plant is developed to maximize hydropower production. Three field tests in various operating heads were carried out in the period of May 2009 to March 2010. Based on data of five test conditions three operating zones for units in various operating heads were proposed. A short-term electricity dispatch optimization model was developed with physical and operational constraints. Unit commitment strategy was put forward for model solution in which unit statuses and output statuses were classified. The strategy aimed at formulating better unit commitment plan according to forecasted load demand ancillary service requirements and initial operating status. The model and the strategy were verified by real cases. The results show that the optimal load distribution among units at every interval can be easily solved by the genetic algorithm based on a fixed unit commitment plan. Schedules are developed with higher average generation efficiency. Units can also be scheduled to operate for a less time within the rough zone and the second feasible zone. The proposed method is already operational for dispatch engineers of the Ertan hydropower plant to determine half-hourly schedules in one day.

Chao Ma; Haijun Wang; Jijian Lian

2011-01-01T23:59:59.000Z

342

Mobile loading transuranic waste at small quantity sites in the Department of Energy complex-10523  

SciTech Connect (OSTI)

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), operates mobile loading operations for all of the large and small quantity transuranic (TRU) waste sites in the Department of Energy (DOE) complex. The mobile loading team performs loading and unloading evolutions for both contact handled (CH) and remote handled (RH) waste. For small quantity sites, many of which have yet to remove their TRU waste, the mobile loading team will load shipments that will ship to Idaho National Laboratory, a centralization site, or ship directly to the Waste Isolation Pilot Plant (WIPP). For example, Argonne National Laboratory and General Electric Vallecitos Nuclear Center have certified programs for RH waste so they will ship their RH waste directly to WIPP. Many of the other sites will ship their waste to Idaho for characterization and certification. The Mobile Loading Units (MLU) contain all of the necessary equipment needed to load CH and RH waste into the appropriate shipping vessels. Sites are required to provide additional equipment, such as cranes, fork trucks, and office space. The sites are also required to provide personnel to assist in the shipping operations. Each site requires a site visit from the mobile loading team to ensure that all of the necessary site equipment, site requirements and space for shipping can be provided. The mobile loading team works diligently with site representatives to ensure that all safety and regulatory requirements are met. Once the waste is ready and shipping needs are met, the mobile loading team can be scheduled to ship the waste. The CH MLU is designed to support TRUPACT-II and HalfPACT loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for TRUPACT-II and HalfPACT loading and shipment certification. The RH MLU is designed to support removable lid canister (RLC) and RH-72B cask loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for RLC and RH-72B Cask loading and shipment certification. To date, the mobile loading team has successfully made 2,131 CH and RH TRU waste shipments. The mobile loading team continues to provide each site with safe and compliant loading ofTRU waste.

Carter, Mitch [Los Alamos National Laboratory; Howard, Bryan [Los Alamos National Laboratory; Weyerman, Wade [Los Alamos National Laboratory; Mctaggart, Jerri [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

343

Application of quantum-inspired binary gravitational search algorithm for thermal unit commitment with wind power integration  

Science Journals Connector (OSTI)

Abstract As the application of wind power energy is rapidly developing, it is very important to analyze the effects of wind power fluctuation on power system operation. In this paper, a model of thermal unit commitment problem with wind power integration is established and chance constrained programming is applied to simulate the effects of wind power fluctuation. Meanwhile, a combination of quantum-inspired binary gravitational search algorithm and chance constrained programming is proposed to solve the thermal unit commitment problem with wind power integration. In order to reduce the searching time and avoid the premature convergence, a priority list of thermal units and a local mutation adjustment strategy are utilized during the optimization process. The priority list of thermal units is based on the weight between average full-load cost and maximal power output. Then, a stochastic simulation technique is used to deal with the probabilistic constraints. In addition, heuristic search strategies are used to handle deterministic constraints of thermal units. Furthermore, the impacts of different confidence levels and different prediction errors of wind fluctuation on system operation are analyzed respectively. The feasibility and effectiveness of the proposed method are verified by the test system with wind power integration, and the results are compared with those using binary gravitational search algorithm and binary particle swarm optimization. The simulation results demonstrate that the proposed quantum-inspired binary gravitational search algorithm has a higher efficiency in solving thermal unit commitment problem with wind power integration.

Bin Ji; Xiaohui Yuan; Xianshan Li; Yuehua Huang; Wenwu Li

2014-01-01T23:59:59.000Z

344

STATEMENT OF CONSIDERATIONS REQUEST BY UNITED TECHNOLOGIES CORPORATION (UNITED  

Broader source: Energy.gov (indexed) [DOE]

RIGHTS TO INVENTIONS MADE UNDER RIGHTS TO INVENTIONS MADE UNDER COOPERATIVE AGREEMENT NUMBER DE-FC04-02AL67610, DOE WAIVER NO. W(A) 02-026. The Petitioner, United Technologies, acting through the United Technologies Research Center (UTRC), has requested a waiver of all domestic and foreign pateni rights to inventions that may be conceived or first actually reduced to practice in the course of UTRC's work as the prime contractor under Cooperative Agreement Number DE-FC04- 02AL67610 entitled "High Density Hydrogen Storage System Demonstration Using NaAIH4 Based Complex Compound Hydrides" with the U.S. Department of Energy (DOE). The work to be done will be the design, development and evaluation of a nydrogen storage medium and system based on NaAIH4 with a 5 kg hydrogen storage capacity and

345

PASSIVE DETECTION OF VEHICLE LOADING  

SciTech Connect (OSTI)

The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

Garrett, A.

2012-01-03T23:59:59.000Z

346

A power supply unit for discharging the plasma electron source  

Science Journals Connector (OSTI)

A power supply unit for discharging a low-temperature plasma generator based on discharge in the crossed electric and magnetic fields is described. The unit operates in a stationary mode with a preset stabiliz...

D. A. Antonovich; V. A. Gruzdev; V. G. Zalesskii…

347

Who`s in control? Recent (and future) trends in load management  

SciTech Connect (OSTI)

This paper summarizes recent utility experience in load management programs and technologies. In addition to summarizing program and technology information, it offers alternative potential futures for load management in a less-regulated electricity industry. The paper is based on a 1994 study for Hydro-Quebec of 23 leading load management programs around the U.S., focused on direct load control, electric thermal storage, standby generation, commercial load management cooperatives, and experimental interactive load management technologies. Load management programs are among the most popular DSM offerings. According to EPRI`s 1992 load management survey, load management programs (comprising direct load control, thermal storage, and standby generation programs) accounted for 670 of the 2321 programs reported, more than any other program type. Also, 6.4 million customers participated in load management programs, more than took part in all energy efficiency rebate programs combined. Thus while the proliferation of energy efficiency programs has been the most visible trend in DSM since the late 1980s, load management remains the dominant program type.

Prindle, W.R.; Birnbaum, I.L.; Rosenstock, S.J.; King, M.B.

1995-12-31T23:59:59.000Z

348

Online Load Balancing for Related Machines 1 Piotr Berman  

E-Print Network [OSTI]

), the load of a machine i in schedule s and Load(s), the load of entire schedule s as follows: load(s; i) = 1On­line Load Balancing for Related Machines 1 Piotr Berman The Pennsylvania State University of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Charikar, Moses

349

Resistance factors calibration and its application using static load test data for driven steel pipe piles  

Science Journals Connector (OSTI)

This paper presents the reliability-based resistance factor calibration of driven steel pipe piles and the implementation of Load and Resistance Factor Design (LRFD) on ... framework based on reliability theory u...

Jae Hyun Park; Jungwon Huh; Kyung Jun Kim…

2013-07-01T23:59:59.000Z

350

Climate Change Impacts on Residential and Commercial Loads in the Western U.S. Grid  

SciTech Connect (OSTI)

This report presents a multi-disciplinary modeling approach to quickly quantify climate change impacts on energy consumption, peak load, and load composition of residential and commercial buildings. This research focuses on addressing the impact of temperature changes on the building cooling load in 10 major cities across the Western United States and Canada. Our results have shown that by the mid-century, building yearly energy consumption and peak load will increase in the Southwest. Moreover, the peak load months will spread out to not only the summer months but also spring and autumn months. The Pacific Northwest will experience more hot days in the summer months. The penetration of the air conditioning (a/c) system in this area is likely to increase significantly over the years. As a result, some locations in the Pacific Northwest may be shifted from winter peaking to summer peaking. Overall, the Western U.S. grid may see more simultaneous peaks across the North and South in summer months. Increased cooling load will result in a significant increase in the motor load, which consumes more reactive power and requires stronger voltage support from the grid. This study suggests an increasing need for the industry to implement new technology to increase the efficiency of temperature-sensitive loads and apply proper protection and control to prevent possible adverse impacts of a/c motor loads.

Lu, Ning; Taylor, Zachary T.; Jiang, Wei; Xie, YuLong; Leung, Lai R.; Correia, James; Wong, Pak C.; Mackey, Patrick S.; Paget, Maria L.

2008-09-30T23:59:59.000Z

351

Evaluation of a Local Air Conditioning Duty Cycling Device as a Load Management Tool  

E-Print Network [OSTI]

.25 minutes. This setting allows a maximum reduction of the demand of the condensing unit of 30%. The direct control device is part of a bi-directional power line carrier load management system. It is a three tier system consisting of a central control... lines to the central control computer (CCC). Once a week, the load survey data from the CCC was copied to a tape to be transferred to the Mesquite Data Center for analysis. A heating and cooling load calculation was performed on each house...

Schneider, K.; Thedford, M.

1986-01-01T23:59:59.000Z

352

Evaluation of fossil plants versus hydro plants for load frequency control  

SciTech Connect (OSTI)

The economics of using hydroplants with Francis turbines or fossil plants for load frequency control are evaluated. Using data from the TVA Gallatin steam plant and the TVA Cherokee, Wilson, and Fontana hydroplants, a cost comparison of different modes of operation for load frequency control was performed considering two plants at a time. The results showed that when the fossil plant was used for load frequency control instead of a hydro plant a lower system generation cost was incurred. Dynamic responses of fossil and hydro units, improved controls for fossil plants, and maneuvering costs of the Gallatin plant are also considered.

Broadwater, R.P.; Johnson, R.L.; Duckett, F.E.; Boston, W.T.

1985-01-01T23:59:59.000Z

353

Final Report: Particulate Emissions Testing, Unit 1, Potomac River  

Broader source: Energy.gov (indexed) [DOE]

Final Report: Particulate Emissions Testing, Unit 1, Potomac River Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Docket No. EO-05-01: TRC Environmental Corporation (TRC) of Lowell, Massachusetts was retained by Mirant Potomac River, LLC (Mirant) to provide sampling and analytical support in completing a Particulate Emission Test of Unit 1 of the Potomac River generating facility. The Test Program at the Potomac facility involved the completion of two series of emissions tests for particulate matter (PM), the first during normal unit operation and the second with the injection of TRONA upstream of hot side ESP fields. All tests were completed while Unit 1 was operating at 90% of full load (84MW)

354

United Nations Environment Programme (UNEP) | Open Energy Information  

Open Energy Info (EERE)

United Nations Environment Programme (UNEP) United Nations Environment Programme (UNEP) (Redirected from United Nations Environment Programme) Jump to: navigation, search Logo: United Nations Environment Programme Name United Nations Environment Programme Address United Nations Avenue, Gigiri PO Box 30552, 00100 Place Nairobi, Kenya Phone number (254-20) 7621234 Coordinates -1.23224986037°, 36.815630436° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-1.23224986037,"lon":36.815630436,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

NREL: Vehicles and Fuels Research - Vehicle Ancillary Loads Reduction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Research Search More Search Options Site Map Photo of Advanced Automotive Manikin Reducing fuel consumption by air conditioning systems is the focus of Vehicle Ancillary Loads Reduction (VALR) activities at NREL. About 7 billion gallons of fuel-about 5.5% of total national light-duty vehicle fuel use-are used annually just to cool light-duty vehicles in the United States. That's why our VALR team works with industry to help increase fuel economy and reduce tailpipe emissions by reducing the ancillary loads requirements in vehicles while maintaining the thermal comfort of the passengers. Approaches include improved cabin insulation, advanced window systems, advanced cooling and venting systems, and heat generated cooling. Another focus of the VALR project is ADAM, the ADvanced Automotive Manikin

356

Residential Load Management Program and Pilot  

E-Print Network [OSTI]

In 1986 LCRA embarked on residential load management to control peak summer loads. At that time, LCRA was considered a summer peaking utility, and residential air conditioning and water heating systems were selected for control. The program...

Haverlah, D.; Riordon, K.

1994-01-01T23:59:59.000Z

357

Helicase Loading at Chromosomal Origins of Replication  

E-Print Network [OSTI]

Loading of the replicative DNA helicase at origins of replication is of central importance in DNA replication. As the first of the replication fork proteins assemble at chromosomal origins of replication, the loaded helicase ...

Bell, Stephen P.

358

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

359

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Space Heating in U.S. Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

360

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Household Demographics of Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Fuels Used and End Uses in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

362

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Household Demographics of Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

363

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

HC.1.11 Fuels Used and End Uses in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census...

364

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Space Heating in U.S. Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

365

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Space Heating in U.S. Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

366

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Household Demographics of Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

367

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Space Heating in U.S. Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" " ",,,"East North Central Census...

368

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Fuels Used and End Uses in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

369

Analysis Methodology for Industrial Load Profiles  

E-Print Network [OSTI]

ANALYSIS METHODOLOGY FOR INDUSTRIAL LOAD PROFILES Thomas W. Reddoch Executive Vice President Eleclrolek Concepts, Inc. Knoxvillc, Tennessee ABSTRACT A methodology is provided for evaluating the impact of various demand-side management... (OSM) options on industrial customers. The basic approach uses customer metered load profile data as a basis for the customer load shape. OSM technologies are represented as load shapes and are used as a basis for altering the customers existing...

Reddoch, T. W.

370

A Novel Approach to Determining Motor Load  

E-Print Network [OSTI]

A NOVEL APPROACH TO DETERMINING MOTOR LOAD by Michael Brown Georgia Tech Research Institute Atlanta, Georgia ABSTRACf Properly sized electric motors are essential if industrial plant efficiency is to be optimized and energy costs... minimized. Because of the difficully in making power measurements on three phase motors, loading is rarely, if ever, checked. A simple indication of motor load can be achieved by measuring operating speed because speed and load are almost linearly...

Brown, M.

371

Chapter 6 - Stage 3: Data Load  

Science Journals Connector (OSTI)

Summary This chapter discusses the Data Load stage of the Guerrilla Analytics workflow. Data Load involves getting data from a receipt location (generally the file system) and loading it into the Data Manipulation Environment (DME). In this chapter, you will learn about the various activities that take place at Data Load. You will learn about the pitfalls and risks in these activities. You will then learn a number of practice tips to mitigate those risks.

Enda Ridge

2015-01-01T23:59:59.000Z

372

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

BPA), the basic requirements for an improved load model were determined. These requirements included modeling the substation

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

373

Load Balancing in Wireless Sensor Networks using Kirchhoff's Voltage Law  

E-Print Network [OSTI]

Load Balancing in Wireless Sensor Networks using Kirchhoff's Voltage Law Stavros Toumpis Electrical balancing in wireless networks with a single class of traffic, focusing our attention on an important example, i.e., Wireless Sensor Networks. The analysis is based on the Wireless Minimum Cost Problem

Toumpis, Stavros

374

Structures buckling under tensile dead load  

Science Journals Connector (OSTI)

...the load measured with a load cell Gefran OC-K2D-C3...PY-2-F-100 (Gefran Spa). Data have been acquired with...elementsAmsterdamElsevier Data Supplement Data Supplement Structures buckling under tensile dead load. A movie of the experiments...

2011-01-01T23:59:59.000Z

375

Flow Duration Curve Load Duration Curve  

E-Print Network [OSTI]

and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data there has been no flow at this site #12;Gather daily flow rate data Load data into a spreasheet Sort largest, etc) Calculate percentage of days flow was exceeded: How do you estimate load with given data

376

Flow Duration Curve Load Duration Curve  

E-Print Network [OSTI]

given flow and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data with Load Duration Curve #12;What are they? How do you make one? #12;DescribesRangeFlows LowFlows 40 % of the time there has been no flow at this site #12;Gather daily flow rate data Load

377

NREL: Vehicle Ancillary Loads Reduction - Physiological Model  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Physiological Model Physiological Model The Vehicle Ancillary Loads Reduction team developed a three-dimensional model to simulate human internal thermal physiological systems (muscle, blood, etc.) and thermoregulatory responses such as metabolic heat generation. The model was developed with ANSYS, a finite element software which computes heat flow by conduction, convection, and mass transport of the blood. A human tissue system model represents the human body, including the physiological and thermal properties of the tissues. The arms and legs consist of bone, muscle, fat, and skin. There are additional lung, abdominal, and brain tissues in the torso and head zones. The model calculates the conduction heat transfer based on the temperature gradients between the tissue nodes. Blood flow is modeled with a network of supply

378

Examination of shaped charge liner shock loading  

SciTech Connect (OSTI)

A series of experiments was conducted for the purpose of achieving a more fundamental understanding of the shaped charge liner shock loading environment. The test configuration, representing the middle portion of a shaped charge, consists of a 50 mm deep, 100 mm tall, and 2 mm thick copper plate driven by 50 mm deep, 100 mm tall, tapered thickness wedge of LX-14. An electrically driven 50 mm square flyer is used to surface initiate the base of the LX-14 causing a plane detonation wave to propagate into the explosive wedge along the liner surface. Fabry-Perot laser velocimetry measures the particle velocity time history of the plate. The CTH and DYNA2D hydrocodes are used to simulate the experiments. Calculations of the velocity profiles are compared to the experimental results. The effects of mesh density, copper material failure and strength models, and explosive detonation models are discussed.

Murphy, M.J.; Moore, T.W.; Lee, C.G.; Breithaupt, R.; Avara, G.R.

1996-07-01T23:59:59.000Z

379

Low reflectance radio frequency load  

DOE Patents [OSTI]

A load for traveling microwave energy has an absorptive volume defined by cylindrical body enclosed by a first end cap and a second end cap. The first end cap has an aperture for the passage of an input waveguide with a rotating part that is coupled to a reflective mirror. The inner surfaces of the absorptive volume consist of a resistive material or are coated with a coating which absorbs a fraction of incident RF energy, and the remainder of the RF energy reflects. The angle of the reflector and end caps is selected such that reflected RF energy dissipates an increasing percentage of the remaining RF energy at each reflection, and the reflected RF energy which returns to the rotating mirror is directed to the back surface of the rotating reflector, and is not coupled to the input waveguide. Additionally, the reflector may have a surface which generates a more uniform power distribution function axially and laterally, to increase the power handling capability of the RF load. The input waveguide may be corrugated for HE11 mode input energy.

Ives, R. Lawrence; Mizuhara, Yosuke M

2014-04-01T23:59:59.000Z

380

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

E-Print Network [OSTI]

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Chapter I (Docket No. RM05 Energy Regulatory Commission. ACTION: Notice of Inquiry (NOI). SUMMARY: The Federal Energy Regulatory, the Commission is inviting comments on section 1233 of the Energy Policy Act of 2005, which defines native load

Laughlin, Robert B.

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

System and method employing a minimum distance and a load feature database to identify electric load types of different electric loads  

DOE Patents [OSTI]

A method identifies electric load types of a plurality of different electric loads. The method includes providing a load feature database of a plurality of different electric load types, each of the different electric load types including a first load feature vector having at least four different load features; sensing a voltage signal and a current signal for each of the different electric loads; determining a second load feature vector comprising at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the different electric loads; and identifying by a processor one of the different electric load types by determining a minimum distance of the second load feature vector to the first load feature vector of the different electric load types of the load feature database.

Lu, Bin; Yang, Yi; Sharma, Santosh K; Zambare, Prachi; Madane, Mayura A

2014-12-23T23:59:59.000Z

382

1993 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

383

Summary Max Total Units  

Broader source: Energy.gov (indexed) [DOE]

Max Total Units Max Total Units *If All Splits, No Rack Units **If Only FW, AC Splits 1000 52 28 28 2000 87 59 35 3000 61 33 15 4000 61 33 15 Totals 261 153 93 ***Costs $1,957,500.00 $1,147,500.00 $697,500.00 Notes: added several refrigerants removed bins from analysis removed R-22 from list 1000lb, no Glycol, CO2 or ammonia Seawater R-404A only * includes seawater units ** no seawater units included *** Costs = (total units) X (estimate of $7500 per unit) 1000lb, air cooled split systems, fresh water Refrig Voltage Cond Unit IF-CU Combos 2 4 5 28 References Refrig Voltage C-U type Compressor HP R-404A 208/1/60 Hermetic SA 2.5 R-507 230/1/60 Hermetic MA 2.5 208/3/60 SemiHerm SA 1.5 230/3/60 SemiHerm MA 1.5 SemiHerm HA 1.5 1000lb, remote rack systems, fresh water Refrig/system Voltage Combos 12 2 24 References Refrig/system Voltage IF only

384

Adapting the International System of Units to the twenty-first century  

Science Journals Connector (OSTI)

...Discussion Meeting on The new SI: units of measurement based on fundamental constants...actually fixes the value of the unit of energy per temperature interval...the new SI, electromagnetic measurements and units will be brought into the system...

2011-01-01T23:59:59.000Z

385

Information technology and innovative drainage management practices for selenium load reduction from irrigated agriculture to provide stakeholder assurances and meet contaminant mass loading policy objectives  

SciTech Connect (OSTI)

Many perceive the implementation of environmental regulatory policy, especially concerning non-point source pollution from irrigated agriculture, as being less efficient in the United States than in many other countries. This is partly a result of the stakeholder involvement process but is also a reflection of the inability to make effective use of Environmental Decision Support Systems (EDSS) to facilitate technical information exchange with stakeholders and to provide a forum for innovative ideas for controlling non-point source pollutant loading. This paper describes one of the success stories where a standardized Environmental Protection Agency (EPA) methodology was modified to better suit regulation of a trace element in agricultural subsurface drainage and information technology was developed to help guide stakeholders, provide assurances to the public and encourage innovation while improving compliance with State water quality objectives. The geographic focus of the paper is the western San Joaquin Valley where, in 1985, evapoconcentration of selenium in agricultural subsurface drainage water, diverted into large ponds within a federal wildlife refuge, caused teratogenecity in waterfowl embryos and in other sensitive wildlife species. The fallout from this environmental disaster was a concerted attempt by State and Federal water agencies to regulate non-point source loads of the trace element selenium. The complexity of selenium hydrogeochemistry, the difficulty and expense of selenium concentration monitoring and political discord between agricultural and environmental interests created challenges to the regulation process. Innovative policy and institutional constructs, supported by environmental monitoring and the web-based data management and dissemination systems, provided essential decision support, created opportunities for adaptive management and ultimately contributed to project success. The paper provides a retrospective on the contentious planning process and offers suggestions as to how the technical and institutional issues could have been resolved faster through early adoption of some of the core principles of sound EDSS design.

Quinn, N.W.T.

2009-10-15T23:59:59.000Z

386

A multi-level simulation platform of natural gas internal reforming solid oxide fuel cell–gas turbine hybrid generation system – Part II. Balancing units model library and system simulation  

Science Journals Connector (OSTI)

Following our integrated hierarchical modeling framework of natural gas internal reforming solid oxide fuel cell (IRSOFC), this paper firstly introduces the model libraries of main balancing units, including some state-of-the-art achievements and our specific work. Based on gPROMS programming code, flexible configuration and modular design are fully realized by specifying graphically all unit models in each level. Via comparison with the steady-state experimental data of Siemens–Westinghouse demonstration system, the in-house multi-level SOFC–gas turbine (GT) simulation platform is validated to be more accurate than the advanced power system analysis tool (APSAT). Moreover, some units of the demonstration system are designed reversely for analysis of a typically part-load transient process. The framework of distributed and dynamic modeling in most of units is significant for the development of control strategies in the future.

Cheng Bao; Ningsheng Cai; Eric Croiset

2011-01-01T23:59:59.000Z

387

Object-Oriented Modelling of a Wind Power Plant in Modelica and Analysis of Loads on Blade Bearings.  

E-Print Network [OSTI]

?? Within this thesis work a strongly simplified yet complete, component-based numerical model for load analysis of a horizontal wind turbine is built up. The… (more)

Rickert, Claas

2011-01-01T23:59:59.000Z

388

High voltage load resistor array  

DOE Patents [OSTI]

A high voltage resistor comprising an array of a plurality of parallel electrically connected resistor elements each containing a resistive solution, attached at each end thereof to an end plate, and about the circumference of each of the end plates, a corona reduction ring. Each of the resistor elements comprises an insulating tube having an electrode inserted into each end thereof and held in position by one or more hose clamps about the outer periphery of the insulating tube. According to a preferred embodiment, the electrode is fabricated from stainless steel and has a mushroom shape at one end, that inserted into the tube, and a flat end for engagement with the end plates that provides connection of the resistor array and with a load.

Lehmann, Monty Ray (Smithfield, VA)

2005-01-18T23:59:59.000Z

389

High efficiency motor program impact assessment: Load analysis  

SciTech Connect (OSTI)

Incentive programs that encourage customers to purchase new or replacement high efficiency motors (HEM) are an element of many utilities DSM efforts. Such a program has been in place at Ontario Hydro since late 1989. The program was expected to rebate up to 800,000 HP over its five year duration. This paper reports on the results of a recently completed load analysis study to assess the load impacts of the program. The findings are based on field metering of integral HP, three-phase induction motors up to 500HP in size, at thirty industrial sites. Using a database of manufacturers`reported effiiencies, loadings and operating times for each of 181 standard and high efficiency motors are estimated. The results will be used as part of program impact evaluation. They indicate lower motor loadings and longer operating hours than had been assumed for interim evaluation. The paper provides detailed estimates of loading by HP group, industrial segment, and end-use. Issues in sample design, field metering and extrapolation to the rebated motor population are also discussed.

Whiting, R. Sr.

1995-12-31T23:59:59.000Z

390

Descents and nodal load in scale-free networks  

Science Journals Connector (OSTI)

The load of a node in a network is the total traffic going through it when every node pair sustains a uniform bidirectional traffic between them on shortest paths. We express nodal load in terms of the more elementary notion of a node’s descents in breadth-first-search [(BFS) or shortest-path] trees and study both the descent and nodal-load distributions in the case of scale-free networks. Our treatment is both semianalytical (combining a generating-function formalism with simulation-derived BFS branching probabilities) and computational for the descent distribution; it is exclusively computational in the case of the load distribution. Our main result is that the load distribution, even though it can be disguised as a power law through subtle (but inappropriate) binning of the raw data, is in fact a succession of sharply delineated probability peaks, each of which can be clearly interpreted as a function of the underlying BFS descents. This find is in stark contrast with previously held belief, based on which a power law of exponent ?2.2 was conjectured to be valid regardless of the exponent of the power-law distribution of node degrees.

Elias Bareinboim and Valmir C. Barbosa

2008-04-17T23:59:59.000Z

391

Modeling Utility Load and Temperature Relationships for Use with Long-Lead Forecasts  

Science Journals Connector (OSTI)

Models relating system-wide average temperature to total system load were developed for the Virginia Power and Duke Power service areas in the southeastern United States. Daily data for the 1985–91 period were used. The influence of temperature ...

Peter J. Robinson

1997-05-01T23:59:59.000Z

392

Microsoft Word - Final Update 6 - UNits 345.DOC  

Broader source: Energy.gov (indexed) [DOE]

6 to: 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload Units 3,4,5 ENSR Corporation January 13, 2006 Document Number 10350-002-420 (Update 6) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant's Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hours and minimum load (35 MW) 12 hours or more in a calendar day. This mode of operation is also referred to as Option B in Mirant Potomac River LLC's December 30, 2005 letter to the U.S. Department of Energy regarding District of Columbia Public Service Commission, Docket No. EO-05-01. The modeling was performed according to the Protocol

393

Methods for Analyzing Electric Load Shape and its Variability  

E-Print Network [OSTI]

graphical displays of load data. We then define someAlthough simply overlaying load data from different timeprovide a good fit to load data in most buildings; their

Price, Philip

2010-01-01T23:59:59.000Z

394

Next Generation Rooftop Unit  

Broader source: Energy.gov (indexed) [DOE]

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

395

Next Generation Rooftop Unit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

396

United States Geological Survey | Open Energy Information  

Open Energy Info (EERE)

Survey Survey Jump to: navigation, search Logo: United States Geological Survey Name United States Geological Survey Address USGS National Center 12201 Sunrise Valley Drive Place Reston, VA Zip 20192 Region Northeast - NY NJ CT PA Area Year founded 1879 Phone number 703-648-5953 Website http://www.usgs.gov/ Coordinates 38.947077°, -77.370315° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.947077,"lon":-77.370315,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

397

United Energy Group PLC | Open Energy Information  

Open Energy Info (EERE)

Energy Group PLC Energy Group PLC Jump to: navigation, search Name United Energy Group PLC Place Haslemere, United Kingdom Sector Hydro, Wind energy Product The company develops small hydro, gas co-generation and wind projects in Serbia and the Serbian part of Bosnia Coordinates 51.08879°, -0.708724° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.08879,"lon":-0.708724,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

398

United Kingdom: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

United Kingdom: Energy Resources United Kingdom: Energy Resources Jump to: navigation, search Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"390px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378051,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

399

United States Forest Service | Open Energy Information  

Open Energy Info (EERE)

Logo: United States Forest Service Name United States Forest Service Short Name USFS Address 1400 Independence Ave., SW Place Washington, D.C. Zip 20250-1111 Year founded 1905 Website http://www.fs.fed.us/ Coordinates 38.887546°, -77.032038° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.887546,"lon":-77.032038,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

400

United States Forest Service | Open Energy Information  

Open Energy Info (EERE)

Service Service (Redirected from USFS) Jump to: navigation, search Logo: United States Forest Service Name United States Forest Service Short Name USFS Address 1400 Independence Ave., SW Place Washington, D.C. Zip 20250-1111 Year founded 1905 Website http://www.fs.fed.us/ Coordinates 38.887546°, -77.032038° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.887546,"lon":-77.032038,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

United States Coast Guard | Open Energy Information  

Open Energy Info (EERE)

Coast Guard Coast Guard Jump to: navigation, search Logo: United States Coast Guard Name United States Coast Guard Address 2100 2nd ST SW Place Washington, District of Columbia Zip 20598 Phone number 202-372-4411 Website http://www.uscg.mil/default.as Coordinates 38.8645267°, -77.013525° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8645267,"lon":-77.013525,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

402

Power Generation Loading Optimization using a Multi-Objective Constraint-Handling Method via  

E-Print Network [OSTI]

results of the power generation loading optimization based on a coal-fired power plant demonstrates algorithm in solving significant industrial problems. I. INTRODUCTION Most power generation plants have.e., heat rate/NOx vs. load, for a given plant condition. There are two objectives for the power generation

Li, Xiaodong

403

Interval type-2 fuzzy PID load frequency controller using Big Bang-Big Crunch optimization  

Science Journals Connector (OSTI)

This paper proposes an optimization based design methodology of interval type-2 fuzzy PID (IT2FPID) controllers for the load frequency control (LFC) problem. Hitherto, numerous fuzzy logic control structures are proposed as a solution of LFC. However, ... Keywords: Big Bang-Big Crunch optimization, Interval type-2 fuzzy PID controllers, Load frequency control

Engin Yesil

2014-02-01T23:59:59.000Z

404

Scalable Load Balancing by Diffusion Alan Heirich California Institute of Technology  

E-Print Network [OSTI]

finite difference techniques to solve the heat equation on this grid. Adjust the 3 #12; 4 CHAPTER 1 with the computer system. 1.2 Problem The efficiency of grid based computations depends on the load balance among pro­ cessors. Scalable grid computations require scalable load balancing methods. These methods must

405

Training Units and Developing Leaders Contents  

E-Print Network [OSTI]

The 2011 edition of (Field Manual) FM 7-0 reflected the Army’s unit training and leader development concepts borne from a decade of persistent combat operations. Army Doctrine Publication (ADP) 7-0, Training Units and Developing Leaders, re-establishes fundamental training and leader development concepts and processes for the U.S. Army. Training doctrine is again based on the Army’s operations and planning processes, now defined by ADP 3-0, Unified Land Operations, and ADP 5-0, The Operations Process. Mission command makes the commander responsible for unit readiness and leader development. Unit commanders must be the subject matter experts. Commanders cannot delegate oversight of unit training and leader development to subordinates. The commander’s physical presence at training sends a clear message to subordinates—unit training and leader development are the most important things the unit does when it is not actively engaged in operations. Unit training and leader development are inextricably linked. Good training supports leader development and good leaders develop good training programs for

Raymond T. Odierno

406

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California  

E-Print Network [OSTI]

electric  interval  load  data  are  available  through details,  each uses electric load data from a period before using  customer  load  data  [KEMA  2003,  Quantum  2004, 

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

2008-01-01T23:59:59.000Z

407

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Household Demographics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

408

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Space Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

409

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Fuels Used and End Uses in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2"...

410

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Space Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Space...

411

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Space Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

412

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Space Heating in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

413

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Space Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

414

United Cool Air  

Broader source: Energy.gov [DOE]

While our process may start with a "basic model" it is seldom that we fabricate more than a few units that are identical.  Therefore, the definition of "basic model" has a large impact on the...

415

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

Hemmert, Karl Scott; Underwood, Keith D

2014-04-01T23:59:59.000Z

416

United States Department of  

E-Print Network [OSTI]

of a typical wind energy production facility, the results warrant further research on the use of acoustic;1 INTRODUCTION Over the past decade, wind energy production capacity in the United States has increased

417

United States of Agriculture  

E-Print Network [OSTI]

United States Department of Agriculture Forest Service Rocky Mountain Research Station Proceedings Research Station. 130 p. Declinesinhabitatofgreatersage, grazing practices, changes in wildfire regimes, increased spread of invasive species, gas and oil

418

Commercial Building Loads Providing Ancillary Services in PJM  

SciTech Connect (OSTI)

The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

MacDonald, Jason; Kiliccote, Sila; Boch, Jim; Chen, Jonathan; Nawy, Robert

2014-06-27T23:59:59.000Z

419

Reservoir compaction loads on casings and liners  

SciTech Connect (OSTI)

Pressure drawdown due to production from a reservoir causes compaction of the reservoir formation which induces axial and radial loads on the wellbore. Reservoir compaction loads increase during the production life of a well, and are greater for deviated wells. Presented here are casing and liner loads at initial and final pressure drawdowns for a particular reservoir and at well deviation angles of 0 to 45 degrees.

Wooley, G.R.; Prachner, W.

1984-09-01T23:59:59.000Z

420

1991 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

This study establishes the Bonneville Power Administration's (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this summary of federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates our 1990 study. BPS's long-range planning incorporates resource availability with a range of forecasted electrical consumption. The forecasted future electrical demands-firm loads--are subtracted from the projected capability of existing resources to determine whether BPA and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, then additional conservation, contract purchases, or generating resources will be needed to meet load growth. This study analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional profile, which includes loads and resources in addition to the federal system. This study presents the federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for 1992- 2012.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Estimation of Hourly Solar Loads on the Surfaces of Moving Refrigerated Tractor Trailers Outfitted with Phase Change Materials (PCMs) for Several Routes across the Continental U.S.  

E-Print Network [OSTI]

The primary objective of this thesis was to calculate solar loads, wind chill temperatures on the surfaces of moving refrigerated tractor trailers outfitted with phase change materials (PCMs) for several routes across the Continental United States...

Varadarajan, Krupasagar

2011-08-31T23:59:59.000Z

422

Preliminary Evaluation of Load Management for Electricity End Users  

E-Print Network [OSTI]

The planning, design and implementation of load management is complex and expensive. The results of a load management program are subject to numerous uncertainties related to load characteristics, power cost savings, load management costs...

Collier, S. E.

1984-01-01T23:59:59.000Z

423

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network [OSTI]

In PJM for example, loads and generators that can follow theto generators and loads, who can follow operator’s second bya reflection of the load’s inability to follow minute-by-

Heffner, Grayson

2008-01-01T23:59:59.000Z

424

Toward Scalable Stochastic Unit Commitment  

E-Print Network [OSTI]

Apr 30, 2014 ... erally aggregated across buses, for each of a system's load zones. ... clearing formulations for the day ahead wholesale electricity market ... business hours and diurnal light patterns, the portion of load derived from heating.

2014-05-16T23:59:59.000Z

425

OpenEI Community - load profile  

Open Energy Info (EERE)

/0 en Commercial and /0 en Commercial and Residential Hourly Load Data Now Available on OpenEI! http://en.openei.org/community/blog/commercial-and-residential-hourly-load-data-now-available-openei <span class=Load data" src="http://en.openei.org/community/files/load_data_figure_small.jpg" style="width:527px; height:285px" title="" />Image source: NREL 

Files: 
application/zip icon

426

Building Technologies Office Load Control Strategies  

Broader source: Energy.gov [DOE]

BTO researches and implements load control strategies, which support the Sustainable and Holistic IntegratioN of Energy storage and Solar PV (SHINES) FOA.

427

Discovering and Loading Data with Power Query  

Science Journals Connector (OSTI)

Discovering, loading, cleaning, and modifying source data is where Power Query comes in. Using this, the... Data Discovery—Find and connect to a myriad of data sources ...

Adam Aspin

2014-01-01T23:59:59.000Z

428

Software-Based Challenges of Developing the Future Distribution Grid  

E-Print Network [OSTI]

data  from  AMI  or  load  research  programs,  constant  power  data.    Load  models  in  PSS/SINCAL  include,  impedance  constant  power  power  systems  modeling   software,  load  composition  is  typically  developed  based  on  customer  class  (residential,   commercial,  industrial),  weather  data,  

Stewart, Emma

2014-01-01T23:59:59.000Z

429

Online Load Balancing for Related Machines 1 (Revised Piotr Berman  

E-Print Network [OSTI]

s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easy to observe that findingOn­line Load Balancing for Related Machines 1 (Revised Version) Piotr Berman The Pennsylvania State of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Karpinski, Marek

430

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network [OSTI]

Load Following)Imbalance Management (Load Following) Energy Imbalanceload participation in ancillary service markets, we offer the following

Heffner, Grayson

2008-01-01T23:59:59.000Z

431

Effect of Surface Oxide Layer of Steel on the Tribological Characteristics of Load-bearing Additives for Multiply-Alkylated Cyclopentane Oil under High Vacuum  

Science Journals Connector (OSTI)

In the present study, two load-bearing additives formulated in MAC base oil that are ... presence of the original oxide layer and its removal should be taken into account when evaluating load-bearing additives. I...

Masabumi Masuko; Shigeru Iijima; Takahiro Terawaki; Akihito Suzuki…

2013-07-01T23:59:59.000Z

432

Plastic instabilities in statically and dynamically loaded spherical vessels  

SciTech Connect (OSTI)

Significant changes were made in design limits for pressurized vessels in the 2007 version of the ASME Code (Section VIII, Div. 3) and 2008 and 2009 Addenda. There is now a local damage-mechanics based strain-exhaustion limit as well as the well-known global plastic collapse limit. Moreover, Code Case 2564 (Section VIII, Div. 3) has recently been approved to address impulsively loaded vessels. It is the purpose of this paper to investigate the plastic collapse limit as it applies to dynamically loaded spherical vessels. Plastic instabilities that could potentially develop in spherical shells under symmetric loading conditions are examined for a variety of plastic constitutive relations. First, a literature survey of both static and dynamic instabilities associated with spherical shells is presented. Then, a general plastic instability condition for spherical shells subjected to displacement controlled and impulsive loading is given. This instability condition is evaluated for six plastic and visco-plastic constitutive relations. The role of strain-rate sensitivity on the instability point is investigated. Calculations for statically and dynamically loaded spherical shells are presented, illustrating the formation of instabilities as well as the role of imperfections. Conclusions of this work are that there are two fundamental types of instabilities associated with failure of spherical shells. In the case of impulsively loaded vessels, where the pulse duration is short compared to the fundamental period of the structure, one instability type is found not to occur in the absence of static internal pressure. Moreover, it is found that the specific role of strain-rate sensitivity on the instability strain depends on the form of the constitutive relation assumed.

Duffey, Thomas A [Los Alamos National Laboratory; Rodriguez, Edward A [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

433

Energy Calculator- Common Units and Conversions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Calculator - Common Units and Conversions Energy Calculator - Common Units and Conversions Calculators for Energy Used in the United States: Coal Electricity Natural Gas Crude Oil Gasoline Diesel & Heating Oil Coal Conversion Calculator Short Tons Btu Megajoules Metric Tons Clear Calculate 1 Short Ton = 20,169,000 Btu (based on U.S. consumption, 2007) Electricity Conversion Calculator KilowattHours Btu Megajoules million Calories Clear Calculate 1 KilowattHour = 3,412 Btu Natural Gas Conversion Calculator Cubic Feet Btu Megajoules Cubic Meters Clear Calculate 1 Cubic Foot = 1,028 Btu (based on U.S. consumption, 2007); 1 therm = 100,000 Btu; 1 terajoule = 1,000,000 megajoules Crude Oil Conversion Calculator Barrels Btu Megajoules Metric Tons* Clear Calculate 1 Barrel = 42 U.S. gallons = 5,800,000 Btu (based on U.S. consumption,

434

A fuzzy linear programming approach to the load shedding and generation reallocation problem  

Science Journals Connector (OSTI)

In this article, an effective method to control a power system during emergency conditions is presented. Based on Fuzzy Linear Programming (FLP), a new technique is developed to solve the Load Shedding and Generation Reallocation (LSGR) optimization ...

R. Hooshmand; V. Tahani; H. Seifi

1998-12-01T23:59:59.000Z

435

An Energy-Saving Load Balancing Method in Cloud Data Centers  

Science Journals Connector (OSTI)

With the development of virtualization technology, data center virtualization in Cloud Computing gradually become ... live virtual machines migration. Our ARMA-based load forecasting reduces the occurrence of vir...

Xiao Li; Mingchun Zheng

2014-01-01T23:59:59.000Z

436

Dynamic Load Partitioning Strategies for Managing Data of Space and Time Heterogeneity in Parallel SAMR Applications  

Science Journals Connector (OSTI)

This paper presents the design and experimental evaluation of two dynamic load partitioning and balancing strategies for parallel Structured Adaptive Mesh Refinement (SAMR) applications: the Level-based Partit...

Xiaolin Li; Manish Parashar

2003-01-01T23:59:59.000Z

437

Steady and Unsteady Wind Loading of Buildings and Structures [and Discussion  

Science Journals Connector (OSTI)

...terrain are briefly discussed. For design based on steady wind loadings the design wind speed is dependent on the acceptable degree of risk. Force and pressure coefficients may be influenced by Reynolds number, surface roughness, wind characteristics...

1971-01-01T23:59:59.000Z

438

The Promise of Load Balancing the Parameterization of Moist Convection Using a Model Data Load Index  

Science Journals Connector (OSTI)

The parameterization of physical processes in atmospheric general circulation models contributes to load imbalances among individual processors of message-passing distributed-multiprocessor systems. Load imbalances increase the overall time to ...

S. P. Muszala; D. A. Connors; J. J. Hack; G. Alaghband

2006-04-01T23:59:59.000Z

439

Second United Nations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nations Nations . DISCLAIMER This report was prepared a s an account of work sponsored by an agency of the United States Government. Neither t h e United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and

440

United States Government  

Broader source: Energy.gov (indexed) [DOE]

.2/06 WED 17:02 FAX 423 241 3897 OIG .2/06 WED 17:02 FAX 423 241 3897 OIG -** HQ . 001 United States Government Department of Energy Department of Energy memorandum DATE: February 9, 2006 Audit Report Number: OAS-L-06-07 REPLY TO ATTN OF; IG-32 (A050R014) SUBJECT: Audit of "The Department's Management of United States Enrichment Corporation Site Services" TO: Manager, Portsmouth/Paducah Project Office INTRODUCTTON AND OBJECTIVE The Paducah Gaseous Diffusion Plant (Paducah), located in western Kentucky, was constructed by the Department of Energy (Department) in the early 1950s to enrich uranium for use in various military and commercial applications. The Department operated the plant until the Energy Policy Act of 1992 created the United States Enrichment Corporation (USEC) as a Government-owned

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments  

Broader source: Energy.gov (indexed) [DOE]

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments James Cummings BA-PIRC; Florida Solar Energy Center Presented at BA Summer Meeting, July 26, 2012 The gist of my message * Fixed capacity AC systems generally provide good RH control in typical residences. * In low-load homes, they may be less effective in achieving good RH control. * On the other hand, variable capacity AC systems have several characteristics which can provide improved RH control in homes. - Both Nordyne and Carrier have variable capacity units, varying from about 40% to 100% of nominal full capacity. - What is variable capacity? -- condenser fan, compressor speed, and AHU fan speed. The gist, continued

442

Automatic Continuous Commissioning of Measurement Instruments in Air Handling Units  

E-Print Network [OSTI]

This paper presents a robust strategy based on a condition-based adaptive statistical method for automatic commissioning of measurement instruments typically employed in air-handling units (AHU). The multivariate statistic method, principal...

Xiao, F.; Wang, S.

2006-01-01T23:59:59.000Z

443

Load Forecast For use in Resource Adequacy  

E-Print Network [OSTI]

p g Monthly employment data for 1995-2012 from Bureau of Labor Statistics. H l Di S i I d l d d f Loads 1995-2012 employment 7) Estimate 84 sets of Daily Temperature Sensitive Loads Using 1928 regional employment 8) Adjust for Embedded and Target Conservation amounts Factor s for each day #12;Input

444

Load Management DSM: Past, Present & Future  

E-Print Network [OSTI]

Load Management has grown in acceptance over the past several decades as a reliable means to provide a demand-side resource of demand capacity. This paper first reviews the significant break-throughs of load management technology then sets the stage...

Gardner, E.

1994-01-01T23:59:59.000Z

445

Thermionic converter in load-switching mode  

SciTech Connect (OSTI)

An electrical equivalent circuit is proposed for a thermionic electrogenerating element. It is suitable for calculation of transients in load-switching mode. Formulas are given for estimating circuit parameters. A sample numerical calculation is given for the transient between no-load and short-circuit regimes. The results may be employed to identify experimental data in the frequency domain.

Mendel'baum, M.A.; Es'kov, V.D.

1983-01-01T23:59:59.000Z

446

1997 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

United States. Bonneville Power Administration.

1997-12-01T23:59:59.000Z

447

Effects of dynamic conditions and sheave efficiency on hook load, derrick load, and line tension  

E-Print Network [OSTI]

EFFECTS OF DYNAMIC CONDITIONS AND SHEAVE EFFICIENCY ON HOOK LOAD, DERRICK LOAD, AND LINE TENSION A Thesis by GREGORY ROBERT LUKE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE May 1991 Major Subject: Petroleum Engineering EFFECTS OF DYNAMIC CONDITIONS AND SHEAVE EFFICIENCY ON HOOK LOAD, DERRICK LOAD, AND LINE TENSION A Thesis by GREGORY ROBERT LUKE Approved as to style and content by: Hans...

Luke, Gregory Robert

1991-01-01T23:59:59.000Z

448

Appears in Computer Architecture Letters, Volume 12 (2010) SMT-Directory: Efficient Load-Load Ordering for SMT  

E-Print Network [OSTI]

-thread "read" bit to every data cache line. When a load executes, it sets the bit corresponding to its threadAppears in Computer Architecture Letters, Volume 12 (2010) SMT-Directory: Efficient Load-Load, TSO, and PC enforce load-load ordering, requiring that loads from any single thread appear to occur

Roth, Amir

449

Combi Systems for Low Load homes  

Broader source: Energy.gov (indexed) [DOE]

text styles text styles Combi Systems for Low Load Homes Center for Energy and Environment, NorthernSTAR, Ben Schoenbauer * Low load homes are more common than ever. * Typical space heating and DHW equipment have capacities larger than necessary * A single heating plant could provide high efficiency heat at lower costs, increased durability and improved combustion safety Context Technical Approach * A condensing water heater and hydronic air handler will used to provide space and water heating loads in almost 300 weatherized homes. * System specifications, sizing, and installation optimization guidelines were all developed. * Contractor capability was developed in MN market, but may not be developed in all local. 4 Recommended Guidance * Determine peak load on system: - Space heating design load (ie 40,000 Btu/hr)

450

Scaling of load in communications networks  

Science Journals Connector (OSTI)

We show that the load at each node in a preferential attachment network scales as a power of the degree of the node. For a network whose degree distribution is p(k)?k??, we show that the load is l(k)?k? with ?=??1, implying that the probability distribution for the load is p(l)?1/l2 independent of ?. The results are obtained through scaling arguments supported by finite size scaling studies. They contradict earlier claims, but are in agreement with the exact solution for the special case of tree graphs. Results are also presented for real communications networks at the IP layer, using the latest available data. Our analysis of the data shows relatively poor power-law degree distributions as compared to the scaling of the load versus degree. This emphasizes the importance of the load in network analysis.

Onuttom Narayan and Iraj Saniee

2010-09-02T23:59:59.000Z

451

LIDAR Wind Speed Measurement Analysis and Feed-Forward Blade Pitch Control for Load Mitigation in Wind Turbines: January 2010--January 2011  

SciTech Connect (OSTI)

This report examines the accuracy of measurements that rely on Doppler LIDAR systems to determine their applicability to wind turbine feed-forward control systems and discusses feed-forward control system designs that use preview wind measurements. Light Detection and Ranging (LIDAR) systems are able to measure the speed of incoming wind before it interacts with a wind turbine rotor. These preview wind measurements can be used in feed-forward control systems designed to reduce turbine loads. However, the degree to which such preview-based control techniques can reduce loads by reacting to turbulence depends on how accurately the incoming wind field can be measured. The first half of this report examines the accuracy of different measurement scenarios that rely on coherent continuous-wave or pulsed Doppler LIDAR systems to determine their applicability to feed-forward control. In particular, the impacts of measurement range and angular offset from the wind direction are studied for various wind conditions. A realistic case involving a scanning LIDAR unit mounted in the spinner of a wind turbine is studied in depth with emphasis on choices for scan radius and preview distance. The effects of turbulence parameters on measurement accuracy are studied as well. Continuous-wave and pulsed LIDAR models based on typical commercially available units were used in the studies present in this report. The second half of this report discusses feed-forward control system designs that use preview wind measurements. Combined feedback/feed-forward blade pitch control is compared to industry standard feedback control when simulated in realistic turbulent above-rated winds. The feed-forward controllers are designed to reduce fatigue loads, increasing turbine lifetime and therefore reducing the cost of energy. Three feed-forward designs are studied: non-causal series expansion, Preview Control, and optimized FIR filter. The input to the feed-forward controller is a measurement of incoming wind speeds that could be provided by LIDAR. Non-causal series expansion and Preview Control methods reduce blade root loads but increase tower bending in simulation results. The optimized FIR filter reduces loads overall, keeps pitch rates low, and maintains rotor speed regulation and power capture, while using imperfect wind measurements provided by the spinning continuous-wave LIDAR model.

Dunne, F.; Simley, E.; Pao, L.Y.

2011-10-01T23:59:59.000Z

452

Time and Cognitive Load 1 Time and Cognitive Load in Working Memory  

E-Print Network [OSTI]

Time and Cognitive Load 1 Time and Cognitive Load in Working Memory Pierre Barrouillet*, Sophie Bourgogne Running head: Time and Cognitive Load Corresponding author: Pierre Barrouillet Pierre manuscript, published in "Journal of Experimental Psychology: Learning, Memory, and Cognition 33, 3 (2007

Paris-Sud XI, Université de

453

Blinded by the load: attention, awareness and the role of perceptual load  

Science Journals Connector (OSTI)

...while including novel data that demonstrate...between perceptual load and the fundamental...effects of perceptual load on visual detection...response gain, the data from each participant...Konstantinou, N. 2014 Data from: blinded by the load: attention, awareness...

2014-01-01T23:59:59.000Z

454

SC: Install units produced by the high performance RTU challenge | The  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technology Solutions Teams » Space Conditioning » Install units Technology Solutions Teams » Space Conditioning » Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification Activities Technology Solutions Teams Lighting & Electrical Space Conditioning Plug & Process Loads Food Service Refrigeration Laboratories Energy Management & Information Systems Public Sector Teams Market Solutions Teams Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification In January 2011, the U.S. Department of Energy (DOE) joined industry partners in the Better Buildings Alliance to release a design specification for 10-ton capacity commercial air conditioners, also known as rooftop units (RTUs).

455

Innovative Resin Transfer and Disposition at Indian Point Unit 1  

SciTech Connect (OSTI)

A number of sites have both operating and shuttered nuclear facilities. Reducing dose to the caretakers can have beneficial effects for other site personnel who may work or pass near the shuttered facility. Furthermore, disposition of waste can have a positive effect on NRC required regular reporting of, and plans for the disposition of on-site wastes. Entergy's Indian Point Energy Center recently reduced the on-site curie load by working with RWE NUKEM and WMG, Inc. to innovatively free and ship nearly 1,000 cubic feet and nearly 600 curies of 30 year old resin and sludge from Unit 1. Old drawings, operations logs, were consulted and transfer lines were remotely checked. The tank selection sequence was primarily based on dose rates. System modifications to facilitate resin transfer were made on the lowest dose tanks first to gain current operating experience. Resin transfers were performed in accordance with the procedures developed, into waiting cask with appropriate waste containers. Decomposed resin of varying consistency could clog discharge lines and operational changes were made to mitigate against flow interruptions. Hydrogen buildup in the tanks was carefully addressed while solidified resin remains a challenge to be overcome. (authors)

Posivak, E.J.; Freitag, A.A.; Miller, R.J. [WMG, Inc., Peekskill, NY (United States)

2007-07-01T23:59:59.000Z

456

United Nations Industrial Development Organization (UNIDO) | Open Energy  

Open Energy Info (EERE)

United Nations Industrial Development Organization (UNIDO) United Nations Industrial Development Organization (UNIDO) Jump to: navigation, search Logo: United Nations Industrial Development Organization Name United Nations Industrial Development Organization Address Wagramer Straße 5, 1220 Place Vienna, Austria Phone number +43 (1) 26026-0 Coordinates 48.2336891°, 16.4174512° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.2336891,"lon":16.4174512,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

457

United States Department of  

E-Print Network [OSTI]

: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution Forest, New Hampshire, began in 1932. One of the studies, still maintained today, consisted of severalUnited States Department of Agriculture Forest Service Northern Research Station Research Paper NRS

458

United States Department of  

E-Print Network [OSTI]

Station at Durham, New Hampshire. The computer program described in this publication was created usingUnited States Department of Agriculture Forest Service Northern Research Station General Technical://www.nrs.fs.fed.us/ Published by: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200

459

United States of Agriculture  

E-Print Network [OSTI]

in wildlife management from the University of New Hampshire in 1988. She joined the Intermountain Research Station in 1993 after working for the States of New Hampshire and Wyoming on projects involving wetlandUnited States Department of Agriculture Forest Service Intermountain Research Station General

460

United States Department of  

E-Print Network [OSTI]

copies: USDA FOREST SERVICE USDA Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution at Durham, New Hampshire; JENNIFER C. JENKINS, jjenkins@fs.fed.us, is a research foresterUnited States Department of Agriculture Forest Service Northeastern Research Station General

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1973 STATISTICAL DIGEST NO. 67 Prepared by STATISTICS a review of the fishery statistics for the year 1973 . These statistics include data on the volume and value of landings of fishery products, employment 1n the fish- eries, quantity of gear operated, number

462

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1971 STATISTICAL DIGEST NO. 65 Prepared by STATISTICS ry statistics for the year 1971 . These statistics include data on the volume and value of landings of fishery products, employment in the fishe ries, quantity of gear operated, number of fishing craft e

463

United States Department of  

E-Print Network [OSTI]

play an important role in a national program for reducing greenhouse gas emissions. The conversion potential through conversion of nonforest land to forest land and through the management of forest lands and sinks in the United States can be identified. International treaties on greenhouse gas reduction require

464

United States Department of  

E-Print Network [OSTI]

as an offset, or for registering carbon dioxide reductions using the U.S. Department of Energy 1605(b. Brown Richard A. Birdsey #12;Visit our homepage at: http://www.nrs.fs.fed.us/ Published by forestry companies and managers of utility company lands, within the United States who are interested

465

United Nations Development Programme  

E-Print Network [OSTI]

United Nations Development Programme Bureau for Development Policy Energy and Atmosphere Programme Development Programme with support from the Government of Norway #12;The views expressed in this volume. #12;5 Acknowledgements 6 Notes on Authors 7 Foreword 9 Executive Summary 27 Introduction: Energy

466

United States Environmental Protection  

E-Print Network [OSTI]

quality in public water systems; remediation of contaminated sites, sediments and ground water; preventionUnited States Environmental Protection Agency Hydrogeologic Framework, Ground-Water Geochemistry/R-02/008 January 2002 Hydrogeologic Framework, Ground-Water Geochemistry, and Assessment of Nitrogen

467

United States Department of  

E-Print Network [OSTI]

Hills National Forest uses such a habitat capability model (HABCAP), but its accuracy is largely unknown, Wildlife Biologist with Black Hills National Forest, Custer, SD 2 South Dakota State UniversityUnited States Department of Agriculture Forest Service Rocky Mountain Forest and Range Experiment

468

United States Department of  

E-Print Network [OSTI]

United States Department of Agriculture Managing Habitats for White-tailed DeerForest Service Rocky Mountain Forest and Range Experiment Station Fort Collins, Colorado 80526 General Technical Report RM-GTR-274 Black Hills and Bear Lodge Mountains of South Dakota and Wyoming Carolyn Hull Sieg and Kieth E

469

United States Department of  

E-Print Network [OSTI]

United States Department of Agriculture Forest Service Pacific Northwest Research Station General.S. Department of Agriculture, Forest Service, Pacific Northwest Research Station. 25 p. Estimates of forest of California's legislatively mandated green- house gas inventory. Reliable estimates of live-tree carbon stores

Fried, Jeremy S.

470

Optimal control strategies for load carrying drones Alicia Arce  

E-Print Network [OSTI]

is an interesting and challenging issue to deal with. Throughout this paper, a dynamic model based on first by two drones. Afterwards, different control techniques are implemented and compared by simulations. The invention of light materials, low energy consumption machines and high performance processing units led

Boyer, Edmond

471

National Energy Modeling System (United States) | Open Energy Information  

Open Energy Info (EERE)

National Energy Modeling System (United States) National Energy Modeling System (United States) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: National Energy Modeling System (United States) Focus Area: Biomass Topics: Policy, Deployment, & Program Impact Website: www.eia.gov/oiaf/aeo/overview/ Equivalent URI: cleanenergysolutions.org/content/national-energy-modeling-system-unite Language: English Policies: "Deployment Programs,Regulations" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Technical Assistance Regulations: Utility/Electricity Service Costs The National Energy Modeling System (NEMS) is a computer-based, energy-economy modelling system of the United States through 2030. NEMS

472

200-BP-5 operable unit treatability test report  

SciTech Connect (OSTI)

The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

NONE

1996-04-01T23:59:59.000Z

473

Variability of Load and Net Load in Case of Large Scale Distributed Wind Power  

SciTech Connect (OSTI)

Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Gomez-Lazaro, E.; Rawn, B.; Dobschinski, J.; Meibom, P.; Lannoye, E.; Aigner, T.; Wan, Y. H.; Milligan, M.

2011-01-01T23:59:59.000Z

474

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Home Appliances Usage Indicators by Type of Housing Unit, 2005" " Million U.S. Housing Units" ,,"Type of Housing Unit" ," Housing Units (millions) ","Single-Family...

475

Case Study: The Effective Use of an Extensive Logical rule Based Data Analytics Approach in Establishing Root Cause of Performance Issues in Widespread Deployments of Unitary Space Air Conditioning Units  

E-Print Network [OSTI]

Today a significant percentage of office spaces are air conditioned using widely deployed unitary systems, either Fan Coil Units (FCU) or Variable Air Volume (VAV) boxes, to achieve high degrees of air conditioned zonal control. However establishing...

Brady, N.

2013-01-01T23:59:59.000Z

476

U. S. Military Expenditures to Protect the Use of Persian Gulf Oil for Motor Vehicles: Report #15 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network [OSTI]

United States and the Persian Gulf Conflict, Policy Analysisof land forces allocated to Persian Gulf. Uses this ratio tobut did not consume Persian- Gulf oil oilc 5. Motor vehicles

Delucchi, Mark; Murphy, James

2006-01-01T23:59:59.000Z

477

21-PWR WASTE PACKAGE WITH ABSORBER PLATES LOADING CURVE EVALUATION  

SciTech Connect (OSTI)

The objective of this calculation is to evaluate the required minimum burnup as a function of initial pressurized water reactor (PWR) assembly enrichment that would permit loading of spent nuclear fuel into the 21 PWR waste package with absorber plates design as provided in Attachment IV. This calculation is an example of the application of the methodology presented in the ''Disposal Criticality Analysis Methodology Topical Report'' (YMP 2003). The scope of this calculation covers a range of enrichments from 0 through 5.0 weight percent U-235, and a burnup range of 0 through 45 GWd/MTU. Higher burnups were not necessary because 45 GWd/MTU was high enough for the loading curve determination. This activity supports the validation of the use of burnup credit for commercial spent nuclear fuel applications. The intended use of these results will be in establishing PWR waste package configuration loading specifications. Limitations of this evaluation are as follows: (1) The results are based on burnup credit for actinides and selected fission products as proposed in YMP (2003, Table 3-1) and referred to as the ''Principal Isotopes''. Any change to the isotope listing will have a direct impact on the results of this report. (2) The results are based on 1.5 wt% Gd in the Ni-Gd Alloy material and having no tuff inside the waste package. If the Gd loading is reduced or a process to introduce tuff inside the waste package is defined, then this report would need to be reevaluated based on the alternative materials. This calculation is subject to the ''Quality Assurance Requirements and Description'' (QARD) (DOE 2004) because it concerns engineered barriers that are included in the ''Q-List'' (BSC 2004k, Appendix A) as items important to safety and waste isolation.

J.M. Scaglione

2004-12-17T23:59:59.000Z

478

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

SciTech Connect (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

479

United Arab Emirates: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

United Arab Emirates: Energy Resources United Arab Emirates: Energy Resources Jump to: navigation, search Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"390px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":24,"lon":54,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

480

Mean and peak wind loads on heliostats  

SciTech Connect (OSTI)

Mean and peak wind loads on flat rectangular or circular heliostats were measured on models in a boundary layer wind tunnel which included an atmospheric surface layer simulation. Horizontal and vertical forces, moments about horizontal axes at the ground level and at the centerline of the heliostat, and the moment about the vertical axis through the heliostat center were measured. Results showed that loads are higher than predicted from results obtained in a uniform, low-turbulence flow due to the presence of turbulence. Reduced wind loads were demonstrated for heliostats within a field of heliostats and upper bound curves were developed to provide preliminary design coefficients.

Peterka, J.A.; Tan, Z.; Cermak, J.E.; Bienkiewicz, B.

1989-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "base load unit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Synthesis of polyoxometalate-loaded epoxy composites  

DOE Patents [OSTI]

The synthesis of a polyoxometalate-loaded epoxy uses a one-step cure by applying an external stimulus to release the acid from the polyoxometalate and thereby catalyze the cure reaction of the epoxy resin. Such polyoxometalate-loaded epoxy composites afford the cured epoxy unique properties imparted by the intrinsic properties of the polyoxometalate. For example, polyoxometalate-loaded epoxy composites can be used as corrosion resistant epoxy coatings, for encapsulation of electronics with improved dielectric properties, and for structural applications with improved mechanical properties.

Anderson, Benjamin J

2014-10-07T23:59:59.000Z

482

Price-Responsive Load (PRL) Program - Framing Paper No.1  

SciTech Connect (OSTI)

By definition, effective and efficient competitive markets need a supply side and a demand side. One criticism of electric restructuring efforts in many states is that most of the attention has been focused on the supply side, in a market focused on the short term. In general, the demand side of the market has been under-addressed. The objective of the New England Demand Response Initiative (NEDRI) is to develop a comprehensive, coordinated set of demand response programs for the New England regional power markets. NEDRI aims to maximize the capability of demand response to compete in the wholesale market and to improve the economic efficiency and environmental profile of the electric sector. To those ends, NEDRI is focusing its efforts in four interrelated areas: (1) ISO-level reliability programs, (2) Market-based price-responsive load programs, (3) Demand response at retail through pricing, rate design, and advanced metering, and (4) End-use energy efficiency resources as demand response. The fourth area, energy efficiency, is the subject of this framing paper. Energy efficiency reduces the energy used by specific end-use devices and systems, typically without affecting the level of service and without loss of amenity. Energy savings and peak load reductions are achieved by substituting technically more advanced equipment, processes, or operational strategies to produce the same or an improved level of end-use service with less electricity. In contrast, load management programs lower peak demand during specific, limited time periods by either (1) influencing the timing of energy use by shifting load to another time period, or (2) reducing the level of energy use by curtailing or interrupting the load, typically with some loss of service or amenity.

Goldman, Charles A.

2002-03-01T23:59:59.000Z

483

UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD  

E-Print Network [OSTI]

UNITED STATES NUCLEAR WASTE TECHNICAL REVIEW BOARD 2300 Clarendon Boulevard, Suite 1300 Arlington are pleased to transmit a technical report prepared by the Nuclear Waste Technical Review Board (Board. Based on its review of data gathered by the DOE and the Center for Nuclear Waste Regulatory Analyses

484

United States Patent [19] Church et al.  

E-Print Network [OSTI]

United States Patent [19] Church et al. [54] CHARACTERIZATION OF INDIVIDUAL POLYMER MOLECULES BASED al.. "ANeutral Amino Acid Change in Segment TIS4 Dramatically Alters the Gating Properties of the Volt- age-Dependent Sodium Channel". 1990, Proc. Natl. Acad. Sci. USA, 87:323-27. Bensirnon. A.. et al

Church, George M.

485

ALBL: an adaptive load balancing algorithm for distributed web systems  

Science Journals Connector (OSTI)

This paper presents an adaptive load balancing algorithm (ALBL) for cluster-based web systems. The balancing policy is based on two criteria: HTTP process time and network delay. The former describes web server ability to process a forthcoming request, while the latter tries to estimate network conditions. Periodic criteria calculations are performed by agents at the web switch and the weight estimation process is transparent to web servers enhancing therefore distributed system's scalability. We put to test our implementation against known blind selection balancing algorithms used at web-farms such as: Round Robin, stateful ones such as Least Connections and adaptive ones such as Least Load. We also put to test performance and scalability of previous algorithms. From our testbed scenario results we show that ALBL algorithm outperforms stateless and stateful algorithms and also presents significant performance gains towards adaptive algorithms. We also show that our algorithm scales well as the number of balancing servers and web cluster's requests rate increases. We also pinpoint ALBL algorithm ability to predict network conditions and web servers load without the use of feedback information obtained by web servers but frequent service and network probes towards web servers issued by the web switch.

Sotirios Kontogiannis; Alexandros Karakos

2014-01-01T23:59:59.000Z

486

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

487

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

UNITED STATES GOVERNMENT UNITED STATES GOVERNMENT lb 15 SUBJECT: THORFJM PROCURENENT PMF'N:TBU Jesse C. Johnson, Gtnager of IRaw Materials Operations3s.Office 3 R. W. Cook, Director of Production ~',LL:::+ I--- DATE: MAR ! 9 1951 The following list of suppliers of thorium and the amounts of materials procured from them by the Mew York Operations Office during calendar year 1950 is being supplied in accordance with Mr. Spelmanls telephone request of March 19. Thorium Lannett Bleachery iinde Air Products Co. Lindsey Light & Chemical Co. lliscellaneous NY0 Liscensing Division Rare Earths, Inc. Wolff-Alport Total - (kilograms) 179 38,2;2 -3 4,210 /vyeoi 4 -q- 2 : i ' \ iti 1 i 0 ;;\I:' --' I F 10 i;;;?/ \ --' L & ;:I :,- :,j( EZi 5 1 :' -I I ri _ I ' R i; .- . )- .i

488

United States Government  

Broader source: Energy.gov (indexed) [DOE]

ng ng United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: APR 18 2003 REPLY TO ATTN OF: IG-34 (A02PR010) Audit Report No.: OAS-L-03-15 SUBJECT: Audit of the Weatherization Assistance Program TO: Director, Weatherization and Intergovernmental Program, EE-2K The purpose of this report is to inform you of the results of our audit of the Weatherization Assistance Program. INTRODUCTION AND OBJECTIVE The Weatherization Assistance Program (Program) was established to increase energy efficiency in dwellings owned or occupied by low-income persons to reduce their residential energy expenditures and improve their health and safety. Since its inception in 1976, the Program has reported that approximately 5 million dwelling units owned or occupied by low-income individuals have been weatherized.

489

United States Government Department  

Broader source: Energy.gov (indexed) [DOE]

OE r 1325.0 OE r 1325.0 (01.93) United States Government Department of memorandum DATE: March 23, 2006 Audit Report Number: OAS-L-06-09 REPLY TO ATTN OF: IG-32 (A060R040) SUBJECT: Audit of"The Department of Energy's Management of the Northeast Home Heating Oil Reserve" TO, Deputy Assistant Secrctary for Petroleum Reserves INTRODUCTION AND OBJECTIVE The Energy Act of 2000 authorized the Secretary of Energy to create a Northeast Home Heating Oil Reserve (Reserve). The Reserve was established as an "emergency buffer" to supplement commercial supplies should a severe supply disruption occur in the heavily heating oil-dependent northeast United States. The Reserve consists of 2 million barrels of emergency home heating oil, enough to provide Northeast consumers adequate supplies for approximately

490

United States Government  

Broader source: Energy.gov (indexed) [DOE]

United States Government United States Government Department of Energy Memorandum DATE: July 29, 2005 REPLY TO ATTN TO: IG-34 (A05HQ002) Audit Report No. OAS-L-05-10 SUBJECT: Agreed-Upon Procedures for Federal Payroll TO: Director, Office of Management, Budget, and Evaluation/Chief Financial Officer, ME-1 INTRODUCTION AND OBJECTIVE The Office of Management and Budget (OMB) Bulletin No. 01-02, "Audit Requirements for Federal Financial Statement," dated October 16, 2000, requires an annual audit of civilian payroll of executive departments and other Government agencies. Auditors are required to follow the agreed-upon procedures in Appendix I-1 of OMB Bulletin No. 01-02, to assess the reasonableness of life insurance, health benefits, and retirement withholdings and contributions.

491

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantifies of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surface by measuring residual hazardous surface contamination, such as tritium and trace organics It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings.

Gregg, Hugh R. (Livermore, CA); Meltzer, Michael P. (Livermore, CA)

1996-01-01T23:59:59.000Z

492

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantities of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surfaces by measuring residual hazardous surface contamination, such as tritium and trace organics. It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings. 1 fig.

Gregg, H.R.; Meltzer, M.P.

1996-05-28T23:59:59.000Z

493

Bioassay Labels Based on Apoferritin Nanovehicles. | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bioassay Labels Based on Apoferritin Nanovehicles. Abstract: Here we report a nanoparticle label based on apoferritin nanovehicle loaded internally with markers for sensitive...

494

Integrated solar heating unit  

SciTech Connect (OSTI)

This patent describes an integral solar heating unit with an integral solar collector and hot water storage system, the unit comprising: (a) a housing; (b) a flat plate solar collector panel mounted in the housing and having a generally horizontal upper edge and an uninsulated, open back surface; (c) a cylindrical hot water tank operatively connected to the solar collector panel and mounted in the housing generally parallel to and adjacent to the upper edge; (d) the housing comprising a hood around the tank a pair of side skirts extending down at the sides of the panel. The hood and side skirts terminate at lower edges which together substantially define a plane such that upon placing the heating unit on a generally planar surface, the housing substantially encapsulates the collector panel and hot water tank in a substantially enclosed air space; (e) the collector including longitudinally extended U-shaped collector tubes and a glazed window to pass radiation through to the collector tubes, and a first cold water manifold connected to the tubes for delivering fresh water thereto and a second hot water manifold connected to the tubes to remove heated water therefrom. The manifolds are adjacent and at least somewhat above and in direct thermal contact with the tank; and, (f) the skirts and hood lapping around the collector panel, exposing only the glazed window, such that everything else in the heating unit is enclosed by the housing such that heat emanating from the uninsulated, open back face of the collector and tank is captured and retained by the housing to warm the manifolds.

Larkin, W.J.

1987-01-20T23:59:59.000Z

495

Advancements in rapid load test data regression.  

E-Print Network [OSTI]

??Rate-dependent effects introduced during rapid and/or dynamic events have typically been oversimplified to compensate for deficiencies in present analyses. As load test results are generally… (more)

Stokes, Michael Jeffrey

2006-01-01T23:59:59.000Z

496

LOAD SHEDDING IN DATA STREAM MANAGEMENT SYSTEMS  

Science Journals Connector (OSTI)

In this chapter, we focus on a fundamental problem that is central to a DSMS. Namely, we investigate the problem of load shedding during temporary overload periods. This problem... ...

Sharma Chakravarthy; Qingchun Jiang

2009-01-01T23:59:59.000Z

497

AMTEC Response to Changes in Resistive Loading  

Science Journals Connector (OSTI)

An important aspect of electric power supply systems is their inherent response time to rapid changes in loading demands. This presentation reviews the experimental response of an Alkali Metal Thermal Electric Converter (AMTEC) system when switched from open circuit to stable resistive loads. Our data show a nominal 35?Watt AMTEC converter responded rapidly throughout the power curve. Response times from open circuit to delivering 90% of peak DC current were within 0.25 milliseconds to 0.85 milliseconds for a range of electrically resistive loads at several typical AMTEC operational temperatures. Such response times to load changes suggest that AMTEC may be suitable as a primary power supply or backup power supply for critical space applications.

Robert W. Fletcher; Thomas K. Hunt

2003-01-01T23:59:59.000Z

498

Hoechst plans Mexican unit  

SciTech Connect (OSTI)

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

499

Reducing Cache Traffic and Energy with Macro Data Load  

E-Print Network [OSTI]

Reducing Cache Traffic and Energy with Macro Data Load Lei Jin Sangyeun Cho Department of Computer data load, an efficient mechanism to enhance loaded value reuse. A macro data load brings (MVRT) shows the significantly increased reuse opportunities provided by macro data load. We also

Cho, Sangyeun

500

Load apparatus and method for bolt-loaded compact tension test specimen  

DOE Patents [OSTI]

A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

1997-02-04T23:59:59.000Z