Powered by Deep Web Technologies
Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Bartlesville Project Office FY 1989 annual report  

SciTech Connect

The Bartlesville Project Office (BPO) was established in 1983 to succeed the Bartlesville Energy Technology Center (BETC). Its lead mission from the Office of Fossil Energy (FE) of the US Department of Energy is to plan and implement research in the Enhanced Oil Recovery (EOR) and Advanced Extraction and Process Technology (AEPT) subprograms of the Petroleum Program. As such, BPO oversees more than 140 research projects falling within these two broad subprograms and support activities. These projects form the major portion of the DOE's National Petroleum Research Program, the critical aim of which is to arrest the decline of domestic oil production and to maximize economic recovery. Project achievements, descriptions and goals are described. 8 figs., 2 tabs.

Not Available

1990-04-01T23:59:59.000Z

2

Bartlesville Project Office FY 1990 Annual report  

SciTech Connect

The Bartlesville Project Office (BPO) was established in 1983 to succeed the Bartlesville Energy Technology Center (BETC). Its lead mission from the Office of Fossil Energy (FE) of the US Department of energy is to plan and implement research in the Enhanced Oil Recovery (EOR) and Advanced Extraction and Process Technology (AEPT) subprograms of the Petroleum Program. As such, BPO oversees some 160 research projects falling within these two broad subprograms and support activities. These projects, form the major portion of DOE's National Petroleum Research Program. The EOR subprogram consists of two research categories: Light Oil and Heavy Oil. These two categories include research activities in: (1) geoscience and reservoir characterization, (2) chemical flooding (3) gas flooding, (4) thermal recovery, (5) novel technology, and (6) microbial EOR. The AEPT subprogram includes research activities in (1) fundamental geoscience and extraction research, (2) supporting technology and environmental research, and (3) university geoscience research. 8 figs., 5 tabs.

Not Available

1991-04-01T23:59:59.000Z

3

Bartlesville Energy Technology Center enhanced oil recovery project data base  

SciTech Connect

A comprehensive EOR project data base that is validated, integrated, and continuously maintained and updated is being developed at BETC. The data base, which is not currently available to the public, provides an information resource to accelerate the advancement and applications of EOR technology. The primary sources of data have been specific EOR Projects certified in the Incentives Program, the DOE Cost-Shared Tertiary Program, and a data base of ongoing EOR projects supplied by Gulf Universities Research Consortium (GURC). Information from these sources has provided an extensive basis for the development of a comprehensive data base relating the key parameters for EOR projects in the United States. The sources and types of data within the data base are organized in a manner which will facilitate information transfer within the petroleum industry. 28 references, 3 figures, 2 tables.

French, T.R.; Ray, R.M.

1984-01-01T23:59:59.000Z

4

Bartlesville Energy Technology Center enhanced oil recovery project data base  

SciTech Connect

The BETC Enhanced Oil Recovery Data Base is currently being developed to provide an information resource to accelerate the advancement and applications of EOR technology. The primary initial sources of data have been the Incentive and Cost-Shared Programs. The data base presently contains information on 607 EOR projects. This includes 410 of the approximately 423 projects which operators originally applied for certification with the Incentive Program; 20 EOR projects under the Cost-Shared Program; and a data base relating to 177 projects developed by Gulf Universities Research Consortium. In addition, relevant data from all previous DOE-funded contractor EOR data bases will be integrated into the BETC data base. Data collection activities from publicly available information sources is continuing on an on-going basis to insure the accuracy and timeliness of the information within the data base. The BETC data base is being developed utilizing a commercial data base management system. The basic structure of the data base is presented as Appendix I. This data base includes information relating to reservoir characteristics, process-specific data, cost information, production data, and contact persons for each project. The preliminary list of data elements and the current density of occurrence is presented as Appendix II. A basic profile of the types of projects contained within the developmental data base is contained in Appendix III. Appendix IV presents a number of system output reports to illustrate potential data base applications. Plans to eventually place the data base in a computer system which would be publicly accessible are currently under active consideration. A list of Incentive projects processed to date by BETC is provided as Appendix V. Appendix VI gives a detailed report by EOR Process for all projects in the BETC's Enhanced Oil Recovery Data Base.

Not Available

1982-03-01T23:59:59.000Z

5

Bartlesville History | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bartlesville History Bartlesville History Bartlesville History The Bartlesville Energy Technology Center, Bartlesville, Oklahoma, circa 1937. The Bartlesville Energy Technology Center, Bartlesville, Oklahoma, circa 1937. Origins of the U.S. Government's First Petroleum Research Laboratory By 1916 the Bureau of Mines, which had been established six years earlier in the U.S. Department of the Interior, recognized the transforming role that petroleum was playing in American society. Across the country, the Bureau had begun establishing experiment stations, each specializing in a different extraction industry - coal, metals, clay, and other minerals - and each located close to the major centers of each resource. Now, the Bureau announced its intent to establish a petroleum experiment station

6

Project Management Coordination Office  

Energy.gov (U.S. Department of Energy (DOE))

The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area...

7

Bartlesville Energy Research Center | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bartlesville Energy Research Center Bartlesville Energy Research Center Bartlesville Energy Research Center The Federal Government in Petroleum Research, 1918-1983 The following is a study of a single research facility, the Bartlesville Energy Research Center, and showcases how petroleum technology, petroleum policy, and national political priorities have interacted through seven decades of the twentieth century. Download entire document Introduction and Table of Contents Chapter 2 - Search for a Role, 1919-1930 Chapter 3 - Emergence of Scientific Research, 1930-1941 Chapter 4 - World War II and the Response of Oil Technology, 1941-1946 Chapter 5 -Petroleum Research Under Siege, 1946-1959 Chapter 6 - Petroleum Science as a National Resource, 1959-1967 Chapter 7 - Government Energy Research: Emerging Definitions, 1968-1975

8

Bartlesville, Oklahoma: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bartlesville, Oklahoma: Energy Resources Bartlesville, Oklahoma: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 36.7473114°, -95.9808179° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.7473114,"lon":-95.9808179,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

9

Fermilab | Directorate | Office of Project Management Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE links DOE Office of Project Assessment (SC-28) DOE Office of Project Assessment Project Management Processes and Procedures DOE Directives Home Page DOE Policies, Orders...

10

Office: ITO PE/Project  

E-Print Network (OSTI)

Projection wall interspersed with low-cost, unobtrusive cameras Seeing PeopleHearing People Concept - Light1 DARPA Office: ITO PE/Project: Pgm No.: Pgm Mgr.: Mills/Swinson PAD No.: Smart Spaces Personal Information Projection · Develop techniques for projecting personal information from cyberspace into smart

Mills, Kevin

11

Portsmouth/Paducah Project Office,  

NLE Websites -- All DOE Office Websites (Extended Search)

June 22, 2012 Robert.Smith@lex.doe.gov DOE Plans Workshop to Assess Paducah Plant Interest PADUCAH, KY. - The U.S. Department of Energy's (DOE) PortsmouthPaducah Project Office is...

12

Portsmouth/Paducah Project Office,  

NLE Websites -- All DOE Office Websites (Extended Search)

August 1, 2012 Robert.Smith@lex.doe.gov DOE Workshop Gauges Paducah Plant Interest PADUCAH, KY - The U.S. Department of Energy's PortsmouthPaducah Project Office (PPPO) is...

13

Building Technologies Office: Nanolubricants Research Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanolubricants Research Nanolubricants Research Project to someone by E-mail Share Building Technologies Office: Nanolubricants Research Project on Facebook Tweet about Building Technologies Office: Nanolubricants Research Project on Twitter Bookmark Building Technologies Office: Nanolubricants Research Project on Google Bookmark Building Technologies Office: Nanolubricants Research Project on Delicious Rank Building Technologies Office: Nanolubricants Research Project on Digg Find More places to share Building Technologies Office: Nanolubricants Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research Water Heating Research Lighting Research

14

Project Management Coordination Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Coordination Office Project Management Coordination Office Project Management Coordination Office The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area of active project management. PMCO is also charged with providing integrated risk management and oversight of EERE work at numerous field sites. This includes activities ranging from performance and project management to monitoring and auditing. PMCO actively collaborates with EERE Offices and field elements. PMCO primarily engages the Golden Field Office, National Energy Technology Laboratory, Oak Ridge National Laboratory and other DOE Operations Offices. PMCO is EERE's corporate resource for Active Project Management, providing

15

Categorical Exclusion Determinations: Portsmouth Paducah Project Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Paducah Project Portsmouth Paducah Project Office Categorical Exclusion Determinations: Portsmouth Paducah Project Office Categorical Exclusion Determinations issued by Portsmouth Paducah Project Office. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2012 CX-009253: Categorical Exclusion Determination Optimization of Electrical Power at the Portsmouth Gaseous Diffusion Facility CX(s) Applied: B4.6, B4.11 Date: 08/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office May 9, 2012 CX-008824: Categorical Exclusion Determination X-608 Well Field Transfer CX(s) Applied: B1.24 Date: 05/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office April 25, 2012 CX-009252: Categorical Exclusion Determination Disposition of Department of Energy Surplus or Excess Personal Property

16

Geothermal Technologies Office: Geothermal Projects  

Energy Savers (EERE)

Skip to Content U.S. Department of Energy Energy Efficiency and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Office Search Search...

17

Office of China Renewable Energy Development Project REDP | Open...  

Open Energy Info (EERE)

Office of China Renewable Energy Development Project REDP Jump to: navigation, search Name: Office of China Renewable Energy Development Project (REDP) Place: Beijing, Beijing...

18

EERE Project Management Center Database PIA, The Office of Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

EERE Project Management Center Database PIA, The Office of Energy Efficiency and Renewable Energy (EERE) EERE Project Management Center Database PIA, The Office of Energy...

19

Contractor Fee Payments- Portsmouth Paducah Project Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Portsmouth Paducah Project Office on these charts.

20

Office of Employee Development Operational Efficiency Project  

E-Print Network (OSTI)

Office of Employee Development Operational Efficiency Project Survey Summary from Supervisory Staff the University titled "Operational Efficiency Project." Its mandate was to gather information, evaluate current operations, review benchmarks and best practices, and develop organizational and/or cost saving alternatives

Huang, Jianyu

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

decisions on how to best use environmental cleanup dollars, said Dave Huizenga, Senior Advisor of DOE Environmental Management (EM). "We're trying to manage projects in a...

22

Depositional environment of the Bartlesville sandstone, La Harpe field, Allen County, Kansas  

E-Print Network (OSTI)

DEPOSITIONAL ENVIRONMENT OF THE BARTLESVILLE SANDSTONE ~ LA HARFE FIELD, ALLEN COUNTY, KANSAS A Thesis by MADELYN SCHUMACHER / Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement... for the degree of MASTER OF SCIENCE May 1976 Major Subject: Geology DEPOSITIONAL ENVIRONMENT OF THE BARTLESVILLE SANDSTONE, LA HARPE FIELD, ALLEN COUNTY, KANSAS A Thesis by MADEL YN SCHUMACHER Approve~ as to style and content by: (Chai an of Co . mittee...

Schumacher, Madelyn

2012-06-07T23:59:59.000Z

23

Enhanced oil recovery projects data base  

SciTech Connect

A comprehensive enhanced oil recovery (EOR) project data base is maintained and updated at the Bartlesville Project Office of the Department of Energy. This data base provides an information resource that is used to analyze the advancement and application of EOR technology. The data base has extensive information on 1,388 EOR projects in 569 different oil fields from 1949 until the present, and over 90% of that information is contained in tables and graphs of this report. The projects are presented by EOR process, and an index by location is provided.

Pautz, J.F.; Sellers, C.A.; Nautiyal, C.; Allison, E.

1992-04-01T23:59:59.000Z

24

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Aug. 23, 2013 Robert.Smith@lex.doe.gov DOE Paducah Site Demolition Debris Shipped to Utah for Disposition Twenty-eight rail cars filled with debris from a major demolition project...

25

Portsmouth Paducah Project Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Paducah Project Office Portsmouth Paducah Project Office Portsmouth Paducah Project Office A rainbow appears over the Paducah Site's East End Smelter, a 21,000-square-foot complex used until the 1980s to smelt metal. Recovery Act workers used heavy equipment to demolish the smelter in September 2010, a year ahead of schedule and $10 million under budget. A rainbow appears over the Paducah Site's East End Smelter, a 21,000-square-foot complex used until the 1980s to smelt metal. Recovery Act workers used heavy equipment to demolish the smelter in September 2010, a year ahead of schedule and $10 million under budget. Second-shift Recovery Act workers at the Paducah Site use scissor lifts and metal saws to remove the outer cover of old uranium hexafluoride process tie lines linking C-410 with other parts of the Paducah Gaseous Diffusion Plant.

26

Building Technologies Office: Vacuum Insulation Panels Research Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Vacuum Insulation Vacuum Insulation Panels Research Project to someone by E-mail Share Building Technologies Office: Vacuum Insulation Panels Research Project on Facebook Tweet about Building Technologies Office: Vacuum Insulation Panels Research Project on Twitter Bookmark Building Technologies Office: Vacuum Insulation Panels Research Project on Google Bookmark Building Technologies Office: Vacuum Insulation Panels Research Project on Delicious Rank Building Technologies Office: Vacuum Insulation Panels Research Project on Digg Find More places to share Building Technologies Office: Vacuum Insulation Panels Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research

27

Independent Oversight Review, Portsmouth/Paducah Project Office- May 2012  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program

28

Support of US CLIVAR Project Office 2012  

SciTech Connect

SUBJECT: CLOSEOUT OF AWARD NO DE-SC0008494 FINAL REPORT: SUPPORT OF US CLIVAR PROJECT OFFICE 2012 UNIVERSITY CORPORATION FOR ATMOSPHERIC RESEARCH Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and development of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals

Cummings, Donna

2013-11-21T23:59:59.000Z

29

Independent Oversight Assessment, Portsmouth/Paducah Project Office- May 2012  

Energy.gov (U.S. Department of Energy (DOE))

Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants

30

Building Technologies Office: Recovery Act-Funded HVAC Research Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

HVAC Research Projects to someone by E-mail HVAC Research Projects to someone by E-mail Share Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Facebook Tweet about Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Twitter Bookmark Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Google Bookmark Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Delicious Rank Building Technologies Office: Recovery Act-Funded HVAC Research Projects on Digg Find More places to share Building Technologies Office: Recovery Act-Funded HVAC Research Projects on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research

31

Building Technologies Office: Recovery Act-Funded Working Fluid Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Fluid Projects to someone by E-mail Working Fluid Projects to someone by E-mail Share Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Facebook Tweet about Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Twitter Bookmark Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Google Bookmark Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Delicious Rank Building Technologies Office: Recovery Act-Funded Working Fluid Projects on Digg Find More places to share Building Technologies Office: Recovery Act-Funded Working Fluid Projects on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research

32

Building Technologies Office: Cold Climate Heat Pump Research Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Cold Climate Heat Pump Cold Climate Heat Pump Research Project to someone by E-mail Share Building Technologies Office: Cold Climate Heat Pump Research Project on Facebook Tweet about Building Technologies Office: Cold Climate Heat Pump Research Project on Twitter Bookmark Building Technologies Office: Cold Climate Heat Pump Research Project on Google Bookmark Building Technologies Office: Cold Climate Heat Pump Research Project on Delicious Rank Building Technologies Office: Cold Climate Heat Pump Research Project on Digg Find More places to share Building Technologies Office: Cold Climate Heat Pump Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research Windows, Skylights, & Doors Research Space Heating & Cooling Research

33

Office of Acquisition and Project Management  

Office of Environmental Management (EM)

Management Office of Nuclear Materials Disposition Office of Waste Treatment PlantTank Farm Program 1122012 16 reduce planning, design, and construction costs and maintenance...

34

The Office of Sustainability and Commuter Services Solar Parking Project  

E-Print Network (OSTI)

The Office of Sustainability and Commuter Services Solar Parking Project Feasibility Study.......................................................................................................................................23 1. Why Leases may Cost less than PPAs

Feschotte, Cedric

35

Implementation of a project office to improve on project delivery and performance: a case study  

Science Journals Connector (OSTI)

As competition increases, rising costs of Information and Communication Technology (ICT) come under the spotlight. As a result, there is pressure on ICT to deliver more with fewer resources. Unsuccessful projects became intolerable. Successful project ... Keywords: project management, project office

J Boonzaaier; J J Van Loggerenberg

2006-10-01T23:59:59.000Z

36

Project Management Update - Paul Bosco, Director, Office of Acquisitio...  

Office of Environmental Management (EM)

PM Update - Paul Bosco, Director, Office of Acquisition & Project Mgt More Documents & Publications Are We There Yet? - Mike Peek, Director, Project Management (MA-63) R1A Slide 1...

37

Independent Activity Report, Portsmouth/Paducah Project Office - April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth/Paducah Project Office - Portsmouth/Paducah Project Office - April 2013 Independent Activity Report, Portsmouth/Paducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System Program [HIAR PORTS-2012-09-24] The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion Plant (PORTS). The review was limited to three requirements of Department of Energy (DOE) Order 226.1B, Implementation of Department of Energy Oversight Policy: FBP's submittal of the initial CAS to the DOE Contracting Officer for review and approval; performance of contractor assessments; and

38

SC Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Projects Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Projects Print Text Size: A A A RSS Feeds FeedbackShare Page SC Projects-Contains information regarding SC projects including project review dates, information on Office of Science Certified Federal Project Directors and Defining the Leadership Traits/Skill Set for a Successful Federal Project Director, and project photos or links to project photo sites. Last modified: 3/18/2013 10:54:36

39

Project Management Coordination Office Organization Chart | Department...  

Office of Environmental Management (EM)

More Documents & Publications Office of Energy Efficiency and Renewable Energy Organization Chart Management Reform Briefing Microsoft PowerPoint - OECM ORG CHART FY11 (Oct2010)...

40

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER June 29, 2011 - 12:00pm Addthis Media Contact Brad Bugger (208) 526-0833 Idaho Falls, ID - The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and government engineering and management, including an eight month stint as acting Deputy Manager for EM. He has extensive experience in business management associated with program planning, development and administration. His experience includes all project phases from conceptual planning, cost and

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Office of Water Project Review And the Deep Draft Navigation  

E-Print Network (OSTI)

1 Office of Water Project Review And the Deep Draft Navigation Planning Center of Expertise US Army Corps of Engineers #12;Civil Works Project Delivery Process Step 10 Division Engineer's Transmittal Construction Funds Step 19 Execute PPA Step 20 Project Construction Step 15 Execute PED Agreement Step 11

US Army Corps of Engineers

42

Project Management Coordination Office Contacts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination Office Contacts Coordination Office Contacts Project Management Coordination Office Contacts A complete list of Project Management Coordination Office points of contact can be found below. The best way to contact PMCO is by sending an email to PMCO@ee.doe.gov. PMCO is a small but nimble group that interacts with a variety of internal and external organizations. Their work includes analyzing current program efforts and the performance of PMCO's management support. Project Performance and Evaluation Methodology and Competency Management Audit Resolution Organization Chart See the Program Management Coordination Office organization chart. Name Phone Email Aguilar, Phaedra (on Detail) 202-287-5924 phaedra.aguilar@ee.doe.gov Baker, Jeff Deputy Director Desk: 720-356-1434

43

Annex 2 Risk Guidance Science Programme Office Project Management  

E-Print Network (OSTI)

1 Annex 2 ­ Risk Guidance Science Programme Office Project Management Guidance on Risk Management the risk. This approach underpins the key objective of risk management. Basic Principles and Process STFC management structure and internal reporting within the STFC's Science Programme Office (SPO) through its

44

DOE Awards Task Order for Lexington Project Office Audit  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

45

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Oak Ridge National Laboratory Site Office (OSO) OSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page ORNL is able to support aspects of the DOE mission by identifying and then pursuing major activities that build on ORNL's core strengths and capabilities. The following projects are underway. 4000 Area Switchgear Vault, Institutional General Plant Project... Home to some of the highest technology research and computing infrastructure in the world, ORNL requires a level of electrical power quality and reliability that is significantly higher than typical

46

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life  

E-Print Network (OSTI)

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life Cycle Reimbursable Funding: http://www.ornl.gov/wfo/exthome.htm October 11, 2010 #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT Project Closeout Process Summary #12;OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY 3 Secretary

47

Fermilab | Directorate | Office of Project Management Oversight...  

NLE Websites -- All DOE Office Websites (Extended Search)

Policies and Procedures Fermi Project Management EVMS PolicyProcedures EVMS Certified System Documents OPSS Guidance Description Desktop Instructions Policy FRA Earned Value...

48

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Ames Site Office (AMSO) AMSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Ames Laboratory Sensitive Instrument Facility Project Description This project will construct a Sensitive Instrument Facility (SIF) that will provide six instrument bays, sample preparation space, control rooms, and staff support space. The instrument bays will provide vibration isolation, acoustic separation and control, electromagnetic interference (EMI) control, strict control of air flow and strict ambient temperature and

49

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Brookhaven Site Office (BHSO) BHSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: TellDOE@bnl.gov Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Interdisciplinary Science Building (ISB) Interdisciplinary Science Building (ISB) The approximately 80,000 gsf 2-story state-of-the-art building will be a new energy efficient and environmentally sustainable laboratory building that will provide modern, 21st-century, high-accuracy laboratories, offices and support functions. The building will intellectually group existing energy research scientists into one facility with collaborative

50

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Berkeley Site Office (BSO) BSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: bsowebinfo@bso.science.doe.gov Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Visit LBNL's Site Construction Information page External link for additional updates. Computational Research & Theory Facility:Currently, the main construction activities are steel and deck placement. The steel placement is due to be complete in December of 2013 and the exterior skin will follow. Project completion is scheduled for early 2015. Solar Energy Research Center: Superstructure is complete and utility

51

Current Projects | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Current Projects Fermi Site Office (FSO) FSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630) 840-3285 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page FSO provides vital oversight to proposed and ongoing science and infrastructure projects at Fermilab. The latest developments in accelerator and detector technology make possible promising new scientific opportunities in neutrino science, as well as in experiments to measure rare processes, using high intensity particle beams. The United States is building on the unique capabilities and infrastructure at Fermilab, with a

52

Native American Conference on Petroleum Energy; November 16-17, 1996; Bartlesville, Oklahoma  

SciTech Connect

Thirty-three Native American tribal members, council members, and other interested parties gathered in Bartlesville, Oklahoma, to attend the Native American Conference on Petroleum Energy on October 16 and 17 1996, sponsored by the U.S. Department of Energy and BDM-Oklahoma, Inc. Tribes represented at the workshop included the Cherokee, Chickasaw, Hopi, Jicarilla Apache, Osage, Seminole, and Ute. Representatives of the Bureau of Indian Affairs (BIA), the Bureau of Land Management (BLM), and the Minerals Management Service (MMS) also attended. BDM-Oklahoma developed and organized the Native American Conference on Petroleum Energy to help meet the goals of the U.S. Department of Energy's Domestic Gas and Oil Initiative to help Native American Tribes become more self-sufficient in developing and managing petroleum resources.

NONE

1999-04-27T23:59:59.000Z

53

UK Climate Change Projects Office | Open Energy Information  

Open Energy Info (EERE)

Office Office Jump to: navigation, search Name UK Climate Change Projects Office Place London, United Kingdom Zip SW1W 9SS Product Government advisory office set up to assist UK businesses who wish to pursue opportunities arising from the Kyoto Protocol. Coordinates 51.506325°, -0.127144° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.506325,"lon":-0.127144,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

54

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life  

E-Print Network (OSTI)

Department of Energy (DOE) Oak Ridge Office (ORO) Project Life Cycle Reimbursable Funding://www.ornl.gov/wfo/exthome.htm September 27, 2007 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Briefing Outline · Summary #12;3 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Secretary of Energy Legal Authority

55

Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell  

NLE Websites -- All DOE Office Websites (Extended Search)

Financial Opportunities Financial Opportunities Printable Version Share this resource Send a link to Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell Market Transformation to someone by E-mail Share Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell Market Transformation on Facebook Tweet about Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell Market Transformation on Twitter Bookmark Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell Market Transformation on Google Bookmark Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell Market Transformation on Delicious Rank Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell Market Transformation on Digg

56

Project Development | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities » Project Facilities » Project Development Nuclear Physics (NP) NP Home About Research Facilities Research Facilities Project Development Science Highlights Benefits of NP Funding Opportunities Nuclear Science Advisory Committee (NSAC) News & Resources Contact Information Nuclear Physics U.S. Department of Energy SC-26/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3613 F: (301) 903-3833 E: sc.np@science.doe.gov More Information » Facilities Project Development Print Text Size: A A A RSS Feeds FeedbackShare Page Project Development in the Office of Nuclear Physics Kern Proposals for Nuclear Physics projects and initiatives vary widely in their scope and complexity. The review and approval process, as well as the means by which support is provided, can differ and is dependent on several

57

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects SLAC Site Office (SSO) SSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Linear Coherent Light Source (LCLS)-II will add two new X-ray laser beams and room for additional new instruments, greatly increasing the number of experiments carried out each year. Its new capabilities will allow scientists to do important research that cannot be done anywhere today, including work in drug development, energy science and advanced materials. https://portal.slac.stanford.edu/sites/lcls_public/lcls_ii/Pages/default.aspx External link

58

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Princeton Site Office (PSO) PSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page National Spherical Torus Experiment (NSTX) The National Spherical Torus Experiment (NSTX) at the U.S. Department of Energy's Princeton Plasma Physics Laboratory (PPPL) is yielding research results that may open an attractive path towards developing fusion energy as an abundant, safe, affordable and environmentally sound means of generating electricity. The NSTX device is exploring a novel structure for the magnetic field used to contain the hot ionized gas, called

59

Current Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Current Projects Pacific Northwest Site Office (PNSO) PNSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page F&O delivers unique facilities to house highly sophisticated collections of equipment. EMSL's new $4.5 million Radiochemistry Annex opens for science and research at the end of April, 2013. The four thousand square foot annex enables studies of contaminated environmental materials and examination of radionuclides and chemical signatures. Radiochemistry Annex Modernization of the Aquatic Research Laboratory (ARL) delivered a flexible

60

2014 Annual Planning Summary for the Office of Advanced Research Projects Agency- Energy  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Advanced Research Energy Projects Agency - Energy.

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

2014 Annual Planning Summary for the Portsmouth/Paducah Project Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Portsmouth/Paducah Project Office.

62

Interpretation of Pennsylvania Bartlesville sandstone in southeastern Kansas and northeastern Oklahoma from continuous dipmeter and gamma-ray logs  

E-Print Network (OSTI)

INTERPRETATION OF PENNSYLVANIAN BARTLESVILLE SANDSTONE IN SOUTHEASTERN KANSAS AND NORTHEASTERN OKLAHOMA FROM CONTINUOUS DIPMETER AND GAMMA-RAY LOGS A Thesis by DWIGHT STANLEY KRANZ Submitted to the Graduate College of Texas A&M University... in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1981 Major Subject: Geology INTERPRETATION OF PENNSYLVANIAN SARTLESVILLE SANDSTONE IN SOUTHEASTERN KANSAS AND NORTHEASTERN OKLAHOMA FROM CONTINUOUS DIPMETER AND GAMMA...

Kranz, Dwight Stanley

2012-06-07T23:59:59.000Z

63

Project Status | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects, Projects, Missions, and Status High Energy Physics (HEP) HEP Home About Research Facilities Facility Ops Experiments at the Energy Frontier Experiments at the Intensity Frontier Experiments at the Cosmic Frontier Projects, Missions, and Status HEP User Facilities Science Highlights Benefits of HEP Funding Opportunities Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Facilities Projects, Missions, and Status Print Text Size: A A A RSS Feeds FeedbackShare Page The Office of High Energy Physics supports the construction of new facilities and major experimental equipment to advance the field of high

64

Office of Sponsored Projects and Industry Partnerships .:. Lawrence  

NLE Websites -- All DOE Office Websites (Extended Search)

Quicklinks: A-Z Index for the OCFO Berkeley Lab Home Contact Us: By Group Contact Us: By Subject Contact Us: Full Listing Employment Financial Systems Modernization (F$M) Fiscal Close Forms: By Group Forms: Full Listing Glossary OCFO EH&S OCFO HR OCFO Home Signature Authority Training ---------------------------------- UCOP University of California DOE CFO U.S. Department of Energy --------------------------------- Cost Accounting Standards DOE Accounting Handbook Federal Accounting Standards Generally Accepted Accounting Principles OMB Circular Regulations & Procedures Manual (RPM) UC Accounting Manual UC/DOE Prime Contract (Contract 31) Quicklinks: A-Z Index for the OCFO Berkeley Lab Home Contact Us: By Group Contact Us: By Subject Contact Us: Full Listing Employment Financial Systems Modernization (F$M) Fiscal Close Forms: By Group Forms: Full Listing Glossary OCFO EH&S OCFO HR OCFO Home Signature Authority Training ---------------------------------- UCOP University of California DOE CFO U.S. Department of Energy --------------------------------- Cost Accounting Standards DOE Accounting Handbook Federal Accounting Standards Generally Accepted Accounting Principles OMB Circular Regulations & Procedures Manual (RPM) UC Accounting Manual UC/DOE Prime Contract (Contract 31) CFO Departments: Budget Office Business Systems Analysis Conference Services Controller's Office Field Operations Management Financial Policy & Assurance Procurement & Property Office of Sponsored Projects & Industry Partnerships Training Travel Office

65

January 18, 2013 Sustainability Office Energy Project Student Technician (Student Tech 1)  

E-Print Network (OSTI)

January 18, 2013 Sustainability Office Energy Project Student Technician (Student Tech 1) Position The OSU Sustainability Office seeks a student employee to scope and implement energy conservation projects and execute related programmatic tasks. The Sustainability Office is part of Campus Operations, the department

Escher, Christine

66

Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind-to-Hydrogen Cost Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) to someone by E-mail Share Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) on Facebook Tweet about Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) on Twitter Bookmark Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) on Google Bookmark Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) on Delicious Rank Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) on Digg Find More places to share Fuel Cell Technologies Office: Wind-to-Hydrogen Cost Modeling and Project Findings (Text Version) on

67

DOE Fuel Cell Technologies Office Record 13013: H2 Delivery Cost Projections 2013  

Energy.gov (U.S. Department of Energy (DOE))

This program record from the U.S. Department of Energy's Fuel Cell Technologies Office provides information about past, current, and projected costs for delivering and dispensing hydrogen.

68

Presented by the Sustainability Projects Fund and the Office of Sustainability  

E-Print Network (OSTI)

Presented by the Sustainability Projects Fund and the Office of Sustainability Please contact Lilith Wyatt at lilith.wyatt@mcgill.ca with any questions ELIGIBILITY Projects must: · Contribute to the advancement of sustainability

Ruthazer, Edward

69

Developing a total replacement cost index for suburban office projects  

E-Print Network (OSTI)

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

70

Certified Federal Project Directors | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Certified Federal Project Directors Certified Federal Project Directors Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors FPD Leadership Skills .pdf file (29KB) SC FPD 360° Mentoring Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors Print Text Size: A A A RSS Feeds FeedbackShare Page Site Federal Project Director Level Certified Project Contact Information Ames Site Office (AMSO) Cynthia Baebler 1 630-252-1563 cynthia.baebler@ch.doe.gov Argonne Site Office (ASO) Dale Dietzel 1 630-252-2555 dale.dietzel@ch.doe.gov

71

Plutonium Immobilization Project, Project Office Quality Assurance Program Description Revision 1  

SciTech Connect

''The quality assurance activity involves the establishment and implementation of the Quality Assurance Program and the development of a Quality Assurance Plan and Procedures. Quality Assurance provides the plans, procedures and controls that are required for repository acceptance and the immobilization plant licensing and design activities.'' The Plutonium Immobilization Project (PIP) has a policy that all development, testing and operational activities be planned and performed in accordance with its customer's needs and expectations, and with a commitment to excellence and continuous improvement. The Immobilization Development and Testing (D&T) Quality Assurance Program establishes implementation requirements which, when completed, will ensure that the program development and test activities conform to the appropriate QA requirements. In order for the program to be effective, a designated quality lead must be in place at the Project Office and each participating site.

Kan, T.

1998-04-30T23:59:59.000Z

72

Completed Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Completed Projects Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Completed Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of completed SC projects Advanced Photon Source External link Building 51 and Bevatron D&D .pdf file (1.1MB) LHC ATLAS .pdf file (322KB) LHC CMS .pdf file (166KB) Linac Coherent Light Source .pdf file (4.6MB)

73

Ongoing Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Current Projects Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated November 2013) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Construction Photos Current Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Photos of current SC Projects 12 GeV CEBAF Upgrade .pdf file (3.2MB) Daya Bay .pdf file (1.0MB) National Spherical Torus Experiment (NSTX) .pdf file (841KB) National Synchrotron Light Source II (NSLS II) .pdf file (6.4MB)

74

Various Project Management Reports | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Various Project Management Reports Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Processes and Procedures Various Project Management Reports Print Text Size: A A A RSS Feeds FeedbackShare Page Government Accountability Office (GAO) GAO-10-199, DOE: Actions Needed to Develop High-Quality Cost

75

Office of Acquisition and Project Management (APM) Organization...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MA-60 Org chart DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 Earned Value (EV) Analysis and Project Assessment & Reporting...

76

State of Nevada, Agency for Nuclear Projects/Nuclear Waste Project Office narrative report, January 1992  

SciTech Connect

The Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) is the State of Nevada agency designated by State law to monitor and oversee US Department of Energy (DOE) activities relative to the possible siting, construction, operation and closure of a high-level nuclear waste repository at Yucca Mountain and to carry out the State of Nevada`s responsibilities under the Nuclear Waste Policy Act of 1982. During the reporting period the NWPO continued to work toward the five objectives designed to implement the Agency`s oversight responsibilities: (1) Assure that the health and safety of Nevada`s citizens are adequately protected with regard to any federal high-level radioactive waste program within the State; (2) Take the responsibilities and perform the duties of the State of Nevada as described in the Nuclear Waste Policy Act of 1982 (Public Law 97-425) and the Nuclear Waste Policy Amendments Act of 1987; (3) Advise the Governor, the State Commission on Nuclear Projects and the Nevada State Legislature on matters concerning the potential disposal of high-level radioactive waste in the State; (4) Work closely and consult with affected local governments and State agencies; (5) Monitor and evaluate federal planning and activities regarding high-level radioactive waste disposal. Plan and conduct independent State studies regarding the proposed repository.

NONE

1992-12-31T23:59:59.000Z

77

DOE Office of Indian Energy Tribal Renewable Energy Project Development and Financing Essentials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Renewable Energy Project Tribal Renewable Energy Project Development and Financing Essentials Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in Indian Country. 2 About the Speaker Elizabeth Doris * Senior Project Leader at the National Renewable Energy Laboratory (NREL) * Specializes in strategies for developing clean energy technologies in public and private markets * Project manager for the DOE Office of Indian Energy project team at NREL 3 Why Complete a Renewable Energy Project?

78

Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about the EV project:...

79

Various Project Management Reports | U.S. DOE Office of Science...  

Office of Science (SC) Website

903-8520 E: sc.opa@science.doe.gov Processes and Procedures Various Project Management Reports Print Text Size: A A A FeedbackShare Page Government Accountability Office (GAO)...

80

Project Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Management Management Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Project Management Print Text Size: A A A RSS Feeds FeedbackShare Page Contains resources and information that may be useful for Federal Project Directors, HQ Program Managers, senior SC management, or contractor project management personnel. Specific information includes:

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Office of River Protection Waste Treatment and Immobilizatin Project Construction Site, Nov. 16-18, 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tour and Review of the Office of River Tour and Review of the Office of River Protection Waste Treatment and Immobilization Project Construction Site, November 16-18, 2010 The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on November 16-18, 2010, at the Office of River Protection Waste Treatment Immobilization Project (WTP) at the Department of Energy (DOE) Hanford Site. The purposes of the visit were to plan and coordinate future HSS oversight activities and to review corrective actions to the most recent HSS review at WTP. The WTP is an industrial complex for separating and vitrifying millions of gallons of radioactive and chemical waste stored at the Hanford site. The WTP complex consists of five major

82

Effective Project Management Office Processes and Technology Transfer: Implementation of an Avaya Voice Over Internet Protocol Telephony System in Mexico  

E-Print Network (OSTI)

This project-thesis examines the technical requirements of a Voice over Internet Protocol (VoIP) solution and is it advantageous for a Multinational Corporation (MNC) to utilize the Project Management Office (PMO) processes as defined by the Project...

Perez, Mary Louise

2012-08-31T23:59:59.000Z

83

Presented by the Sustainability Projects Fund and the McGill Office of Sustainability  

E-Print Network (OSTI)

Presented by the Sustainability Projects Fund and the McGill Office of Sustainability Please of sustainability at McGill, from a life-cycle perspective Primarily impact the McGill campus community Be led with the mission of the Sustainability Projects Fund: to build a culture of sustainability among the McGill campus

Ruthazer, Edward

84

Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

broad user community and, during construction, are maintained on schedule and within cost. Furthermore, the construction projects adhere to the highest standards of safety....

85

Construction Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Construction Construction Projects Scientific User Facilities (SUF) Division SUF Home About User Facilities Accelerator & Detector Research & Development Principal Investigators' Meetings Scientific Highlights Construction Projects BES Home Construction Projects Print Text Size: A A A RSS Feeds FeedbackShare Page Experiments in support of basic research require that state-of-the-art facilities are built or existing facilities are modified to meet unique research requirements and keep the U.S. scientific enterprise world leading. Reactors, x-ray light sources, and pulsed neutron sources are among the expensive, but necessary, facilities required, and the BES program funds for the construction and modification of these facilities. The BES construction projects are conceived and planned with the broad user

86

The Geothermal Technologies Office Invests $18 Million for Innovative Projects  

Energy.gov (U.S. Department of Energy (DOE))

In support of a low carbon future, the United States Department of Energy today announced up to $18 million for 32 projects that will advance geothermal energy development in the United States. The...

87

Offices | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Offices Offices Offices All Offices Program Offices Advanced Research Projects Agency - Energy Loan Programs Office Office of Electricity Delivery & Energy Reliability Office of Energy Efficiency & Renewable Energy Office of Environmental Management Office of Fossil Energy Office of Indian Energy Policy and Programs Office of Legacy Management Office of Nuclear Energy Office of Science Staff Offices Office of Congressional and Intergovernmental Affairs Office of Economic Impact and Diversity Office of Energy Policy and Systems Analysis Office of Health, Safety and Security Office of Hearings and Appeals Office of Inspector General Office of Intelligence and Counterintelligence Office of Management Office of NEPA Policy and Compliance Office of Policy and International Affairs

88

DOE Office of Indian Energy Renewable Energy Project Development Training: Tools and Information You Can Use  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Project Development Training: Curriculum Overview National Congress of American Indians Annual Meeting: November 1, 2011 Tracey A. LeBeau, Director, DOE Office of Indian Energy Pilar Thomas, Deputy Director, DOE Office of Indian Energy Dan Beckley, Jeff Bedard, and Liz Doris, National Renewable Energy Laboratory Matt Ferguson and Joe Cruz, The Reznick Group DOE Office of Indian Energy Mission: Direct, foster, coordinate, and implement energy planning, education, management, and programs that assist tribes with energy development, capacity building, energy infrastructure, energy costs, and electrification of Indian lands and homes. Why Are We Here? Indian Country contains a significant portion of United States energy resources

89

2008 Project Management Awards | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Awards » 2008 Project Management Awards Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Awards 2008 Project Management Awards Print Text Size: A A A RSS Feeds FeedbackShare Page Presented at the 2009 Department of Energy Project Management Workshop SECRETARY'S AWARD of ACHIEVEMENT: Office of Science, Large Hadron Collider (LHC) ATLAS and CMS Detector

90

The Department of Energy, Office of Environmental Restoration and Waste Management: Project performance study  

SciTech Connect

The Office of Environmental Restoration and Waste Management (EM) of the US Department of Energy commissioned Independent Project Analysis, Inc. (IPA) to perform this Project Performance Study to provide a quantitative analysis determining how well EM develops and executes environmental remediation and waste management projects. The approach consisted of collecting detailed data on a sample of 65 completed and ongoing EM projects conducted since 1984. These data were then compared with key project characteristics and outcomes from 233 environmental remediation projects (excluding EM) in IPA`s Environmental Remediation Database and 951 projects In IPA`s Capital Projects Database. The study establishes the standing of the EM system relative to other organizations, and suggests areas and opportunities for improvement.

Not Available

1993-11-01T23:59:59.000Z

91

Building Technologies Office: R&D Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

R&D Projects R&D Projects DOE leadership and support spur advances in the efficacy and performance of light-emitting diode (LED) and organic LED (OLED) technologies-advances that might not otherwise be achieved without DOE funding. (Some of the following documents are available as Adobe Acrobat PDFs. Download Adobe Reader.) The three-pronged DOE SSL R&D program addresses: Core Technology Research, focusing on applied research for technology development, with particular emphasis on meeting efficiency, performance, and cost targets. This research fills technology gaps to overcome technical barriers, and is subject to the Exceptional Circumstances Determination regarding intellectual property. Product Development, using the knowledge gained from basic or applied research to develop or improve commercially viable materials, devices, or systems.

92

DOE Awards Supercomputer Access to Cutting-Edge Projects | U.S. DOE Office  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Awards DOE Awards Supercomputer Access to Cutting-Edge Projects News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 12.18.08 DOE Awards Supercomputer Access to Cutting-Edge Projects Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, D.C. - The U.S. Department of Energy's (DOE) Office of Science announced today that 66 projects addressing some of the greatest scientific challenges have been awarded access to some of the world's most powerful supercomputers at DOE national laboratories. The projects-competitively selected for their technical readiness and scientific merit-will advance research in key areas such as astrophysics,

93

Major Projects with Quick Starts & Jobs Creation Office of Clean Coal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects with Quick Starts & Jobs Creation Projects with Quick Starts & Jobs Creation Office of Clean Coal Summary of Projects and Job Creation The following table outlines the near-term possibilities for projects that capture and sequester carbon from coal-based systems. The potential jobs associated with these activities are listed along with likely construction and operation dates. Since the funding is primarily for construction and associated activities, a rough estimate of 30 job years per $1 million dollars expended was used. COAL/CCS PROJECTS & JOBS CREATION GOV'T INDUSTRY TOTAL TOTAL FUNDING FUNDING FUNDING AWARD JOB PROGRAM/PROJECT ($Million) ($Million) ($Million) DATE CONSTRUCT OPERATE YEARS Current CCPI 440 660 1,100 2010 late 2011 2014 33,000 CCPI Plus $1000M for Additional Projects 1000 1000 2,000 2010 late 2011 2014 60,000

94

Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WVDP-2011-11-07 WVDP-2011-11-07 Site: West Valley Demonstration Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the West Valley Demonstration Project Dates of Activity : 11/07/2011 Report Preparer: Joseph P. Drago Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE West Valley Demonstration Project (WVDP) Office and the nuclear facility at West Valley, NY, on November 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's activities, and

95

Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the West Valley Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

WVDP-2011-11-07 WVDP-2011-11-07 Site: West Valley Demonstration Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Orientation Visit to the West Valley Demonstration Project Dates of Activity : 11/07/2011 Report Preparer: Joseph P. Drago Activity Description/Purpose: The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE West Valley Demonstration Project (WVDP) Office and the nuclear facility at West Valley, NY, on November 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's activities, and

96

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project  

E-Print Network (OSTI)

STUDENT HOURLY OFFICE ASSISTANT Position available with the History of Cartography Project Hours · Must be enrolled UW student; work study funding accepted · Experience with Word, Excel, database To apply, submit a detailed letter of application and resume to Beth Freundlich at: History of Cartography

Wisconsin at Madison, University of

97

Fuel Cell Technologies Office: Recovery Act Projects Funded for Fuel Cell  

NLE Websites -- All DOE Office Websites (Extended Search)

Act Projects Funded for Fuel Cell Market Transformation Act Projects Funded for Fuel Cell Market Transformation Following the fuel cell funding announcement, DOE funded the fuel cell market transformation projects listed below. These projects focus on fuel cell systems in emergency backup power, material handling, and combined heat and power applications, with the goal of improving the potential of fuel cells to provide power in stationary, portable, and specialty vehicles. The Fuel Cell Technologies Office is collecting and analyzing data from these projects to show potential adopters the benefits and real-world performance of fuel cells. These data are aggregated across industries and sites as composite data products to provide relevant technology status results and fuel cell performance data without revealing proprietary information. These publicly available data products build the business case for fuel cells and help fuel cell developers understand the state of technologies while identifying ways to improve them.

98

Facies architecture of the Bluejacket Sandstone in the Eufaula Lake area, Oklahoma: Implications for the reservoir characterization of the Bartlesville Sandstone  

SciTech Connect

Outcrop studies of the Bluejacket Sandstone (Middle Pennsylvanian) provide significant insights to reservoir architecture of the subsurface equivalent Bartlesville Sandstone. Quarry walls and road cuts in the Lake Eufaula area offer excellent exposures for detailed facies architectural investigations using high-precision surveying, photo mosaics. Directional minipermeameter measurements are being conducted. Subsurface studies include conventional logs, borehole image log, and core data. Reservoir architectures are reconstructed in four hierarchical levels: multi-storey sandstone, i.e. discrete genetic intervals; individual discrete genetic interval; facies within a discrete genetic interval; and lateral accretion bar deposits. In both outcrop and subsurface, the Bluejacket (Bartlesville) Sandstone comprises two distinctive architectures: a lower braided fluvial and an upper meandering fluvial. Braided fluvial deposits are typically 30 to 80 ft thick, and are laterally persistent filling an incised valley wider than the largest producing fields. The lower contact is irregular with local relief of 50 ft. The braided-fluvial deposits consist of 100-400-ft wide, 5-15-ft thick channel-fill elements. Each channel-fill interval is limited laterally by an erosional contact or overbank deposits, and is separated vertically by discontinuous mudstones or highly concentrated mudstone interclast lag conglomerates. Low-angle parallel-stratified or trough cross-stratified medium- to coarse-grained sandstones volumetrically dominate. This section has a blocky well log profile. Meandering fluvial deposits are typically 100 to 150 ft thick and comprise multiple discrete genetic intervals.

Ye, Liangmiao; Yang, Kexian [Univ. of Tulsa, OK (United States)

1997-08-01T23:59:59.000Z

99

DOE Office of Indian Energy Renewable Energy Project Development: Advanced Financing Concepts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concepts Concepts Why It Makes Sense to Bring on a Third-Party Partner Course Outline What we will cover...  About the DOE Office of Indian Energy Education Initiative  Concepts for Financing Renewable Energy Projects on Tribal Lands - Levelized Cost of Energy (LCOE) - Business Structures - Tax-Equity Partnerships - Introduction  Additional Information and Resources 2 Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in Indian Country.

100

Program or Field Office: Project Title and I.D. No.:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0207-1609) Planar Energy - Solid-State All Inorganic Rechargeable Lithium Batteries Location: Florida Proposed Action or Project Description: American Recover), and Reinvestment Act: ~ Funding will support laboratory, bench scale, and pilot scale research and development on lithium battery manufacturing processes for use in electrical energy storage for transportation. Categorical Exclusion(s) Applied: x ~ 83.6 Sitinglconstruct1onJoperationldecommlssloning of facilities for bench-scale research, conventional laboratory operations, smalJ..scale research and development and pilot projects *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRIO 21 £::lli:klkrc

102

Review and Selection of Research Projects | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Review and Selection of Research Projects Review and Selection of Research Projects High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search Peer Merit / Review Policies Early Career Research Opportunities in High Energy Physics Graduate Fellows in High Energy Theory Guidelines Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Peer Merit / Review Policies Review and Selection of Research Projects Print Text Size: A A A RSS Feeds FeedbackShare Page All research projects supported by the Office of High Energy Physics (HEP)

103

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nt of n y nt of n y Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0471-1508) NAVITASMAX - Novel Tuning of Critical Fluctuations for Advanced Thermal Energy Storage Location: *- Multiple States - Arizona, Massachusetts, New York, Colorado Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support a proof-of-concept project that evaluates and optimizes simple and complex supercritical fluids for use as novel heat storage, transfer, and working fluids in solar and nuclear applications. Proposed work consists of indoor laboratory-based research and development (R&D), modeling, and analysis, including (1) developing theoretical models to explore inhomogeneities and heat capacity anomalies in supercritical fluids, and prove potential to increase heat capacity over ranges of

104

DOE - Office of Legacy Management -- Project Rio Blanco - CO 0-09  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Rio Blanco - CO 0-09 Project Rio Blanco - CO 0-09 FUSRAP Considered Sites Site: Project Rio Blanco (CO.0-09) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: ~ 52 miles north of Grand Junction, Co. , Rio Blanco County , Colorado CO.0-09-1 Evaluation Year: 1985 CO.0-09-1 Site Operations: The project was a cooperative research effort undertaken in 1973 between CER Geonuclear Corp, Continental Oil Co (Conoco), and the US Energy Research and Development Administration Nevada Operations Office (ERDA/NV) to assess the commercial feasibility of using nuclear explosives to recover natural gas from low permeability formations in the Rocky Mountains. CO.0-09-1 Site Disposition: Eliminated - Radiation levels below criteria CO.0-09-1

105

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency - Energy Project Title: (0471-1544) Sheetak Inc. - Thermoelectric Reactors for Efficient Automotive Thermal Storage Location: *- Multiple States - New York, Pennsylvania, Texas Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support development of a novel system of thermoelectric reactors for efficient automotive thermal energy storage (TREATS) in electric vehicle and plug-in hybrid electric vehicle Heating, Ventilation, and Cooling (HVAC) systems. Proposed work consists of indoor laboratory-based research and development, including (1) experimentation and analysis to assess the mechanics and dynamics of thermoelectric reactors, (2) design, fabrication, testing, and analysis of hot and cold reactors, (3) design, fabrication, testing, and

106

Program or Field Office: Project Title and I. D. No.: Locatio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

107

Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program, May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

108

State of Nevada, Agency for Nuclear Projects/Nuclear Waste Project Office narrative report, October 1--December 31, 1991  

SciTech Connect

The Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) is the State of Nevada agency designated by State law to monitor and oversee US Department of Energy (DOE) activities relative to the possible siting, construction, operation and closure of a high-level nuclear waste repository at Yucca Mountain and to carry out the State of Nevada`s responsibilities under the Nuclear Waste Policy Act of 1982. During the reporting period the NWPO continued to work toward the five objectives designed to implement the Agency`s oversight responsibilities. (1) Assure that the health and safety of Nevada`s citizens are adequately protected with regard to any federal high-level radioactive waste program within the State. (2) Take the responsibilities and perform the duties of the State of Nevada as described in the Nuclear Waste Policy Act of 1982 (Public Law 97-425) and the Nuclear Waste Policy Amendments Act of 1987. (3) Advise the Governor, the State Commission on Nuclear Projects and the Nevada State Legislature on matters concerning the potential disposal of high-level radioactive waste in the State. (4) Work closely and consult with affected local governments and State agencies. (5) Monitor and evaluate federal planning and activities regarding high-level radioactive waste disposal. Plan and conduct independent State studies regarding the proposed repository.

NONE

1991-12-31T23:59:59.000Z

109

Office of River Protection (RPP) Interface Management in the Multi Contract Project Environment at Hanford  

SciTech Connect

The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces.

SHIKASHIO, L.A.

2000-09-22T23:59:59.000Z

110

Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317  

SciTech Connect

To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)

Elmer, John; Butherus, Michael [S.M. Stoller Corporation (United States)] [S.M. Stoller Corporation (United States); Barr, Deborah L. [U.S. Department of Energy Office of Legacy Management (United States)] [U.S. Department of Energy Office of Legacy Management (United States)

2013-07-01T23:59:59.000Z

111

Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT TO THE REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the Environmental Management Advisory Board, since tasking in March 2010. In particular, this report includes the summary observations developed and recommendations previously approved by the EMAB on the Subcommittee's work and presented to the then Assistant Secretary of Environmental Management (EM). As the

112

The Next-Generation Ecosystem Experiments (NGEE Arctic) project is supported by the Office of Biological and Environmental Research in the DOE Office of Science.  

E-Print Network (OSTI)

The Next-Generation Ecosystem Experiments (NGEE Arctic) project is supported by the Office 600 800 1000 1200 1400 m/z 0.0 0.5 1.0 1.5 2.0 2.5 8x10 Intensity Degradation products/Organic acids ­ Chemical Characteristics Summary and Implications In order to predict rates of carbon release from tundra

113

Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000  

SciTech Connect

This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

DOE /NV

2000-04-01T23:59:59.000Z

114

AE Work Team Short Roster Strategic Purchasing-Office Supplies v 1.1 2012-01-06 dgk Project Member Team Role UW-Madison Role  

E-Print Network (OSTI)

AE Work Team Short Roster Strategic Purchasing- Office Supplies v 1.1 2012-01-06 dgk Project Member II Work Team Roster: Strategic Purchasing - Office Supplies #12; Team Role UW-Madison Role Tammy Starr Team Leader Office of Human Resources (OHR) Mike Marean Team

Sheridan, Jennifer

115

Operational Awareness Oversight of the Portsmouth/Paducah Project Office Performance of the Contractor Assurance System Program, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR PORTS-2012-09-24 HIAR PORTS-2012-09-24 Site: Portsmouth Gaseous Diffusion Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System (CAS) Program Dates of Activity : 09/24/12 - 10/04/12 Report Preparer: Joseph P. Drago Activity Description/Purpose: The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion Plant (PORTS). The review was limited to three requirements of Department of Energy (DOE) Order 226.1B, Implementation of Department of Energy Oversight Policy:

116

Annex III-evaluation of past and ongoing enhanced oil recovery projects  

SciTech Connect

The Infill Drilling Predictive Model (IDPM) was developed by Scientific Software-Intercomp (SSI) for the Bartlesville Project Office (BPO) of the United States Department of Energy (DOE). The model and certain adaptations thereof were used in conjunction with other models to support the Interstate Oil and Gas Compact Commission`s (IOGCC) 1993 state-by-state assessment of the potential domestic reserves achievable through the application of Advanced Secondary Recovery (ASR) and Enhanced Oil Recovery (EOR) techniques. Funding for this study was provided by the DOE/BPO, which additionally provided technical support. The IDPM is a three-dimensional (stratified, five-spot), two-phase (oil and water) model which uses a minimal amount of reservoir and geologic data to generate production and recovery forecasts for ongoing waterflood and infill drilling projects. The model computes water-oil displacement and oil recovery using finite difference solutions within streamtubes. It calculates the streamtube geometries and uses a two-dimensional reservoir simulation to track fluid movement in each streamtube slice. Thus the model represents a hybrid of streamtube and numerical simulators.

Not Available

1995-02-01T23:59:59.000Z

117

Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Visit at the LANL CMRR Project Facility Construction Site, November 1-5, 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Independent Oversight's Office of Environment, Safety and Health Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Visit at the LANL CMRR Project Facility Construction Site, November 1-5, 2010 The U. S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on November 1-5, 2010, at the Chemical and Metallurgy Research Replacement (CMRR) project site at the Department of Energy Los Alamos National Laboratory (LANL). The purpose of the visit was to determine ways in which HSS would be able to carry out its independent oversight responsibilities with respect to this project in a method that encourages integration with DOE-LANL. The orientation visit was conducted by the HSS LANL Site Lead and an HSS contractor.

118

Office of the Faculty of Engineering Syllabus for the Degree Project for the B.A. in Industrial Design  

E-Print Network (OSTI)

Office of the Faculty of Engineering Syllabus for the Degree Project for the B.A. in Industrial Design Approved by the Board of the Faculty of Engineering on 2nd March 2009 and valid from 1 st January of compulsory courses that can be accredited to the degree of Bachelor of Arts in Industrial Design. Exemption

119

Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants, May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of the Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

120

Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants, May 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment of the Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants May 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995  

SciTech Connect

This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

NONE

1995-06-01T23:59:59.000Z

122

Report on Inspection of an Intelligence Work-For-Others Project at the Idaho Operations Office, IG-0367  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT ON INSPECTION OF AN INTELLIGENCE WORK-FOR-OTHERS PROJECT AT THE IDAHO OPERATIONS OFFICE The Office of Inspections wants to make the distribution of its inspection reports as customer friendly and cost effective as possible. Therefore, we are making this report available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vml.hqadmin.doe.gov We are experimenting with various options to facilitate audit report distribution. Your comments would be appreciated and can be provided on the Customer Comment Form attached to the

123

RECIPIENT:SD Energy Office u.s. DEP.-illTlVlENT OF ENERGY EERE PROJECT MANAG  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SD Energy Office SD Energy Office u.s. DEP.-illTlVlENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION PROJECf TITLE : Technical analysis for geothermal system Page I of2 STATE: SO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOQOQS2 DE-EEOOOO145 GFO-09-152-007 0 Based on my review of abe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.tA), I have made tbe following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including. but not limited to. literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

124

RECIPIENT:Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada State Office of Energy STATE:NV Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program - Enigma Energy TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA"()000052 DE-EE-OOOOO84 GFO-0000084-012 EE84 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the foUowmg determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation. and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders. owners, consultants. designers). organizations (such as utilities). and state

125

Vehicle Technologies Office Merit Review 2014: Catalyst Characterization (Agreement ID:9130) Project ID:18519  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Cummins at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about catalyst characterization.

126

Introduction of Grid Computing Application Projects at the NASA Earth Science Technology Office  

Science Journals Connector (OSTI)

In 2003, NASA Earth Science Technology Office (ESTO) awarded funding for 20 new ... specifically used Grid computing technology in their Earth science applications:

Kai-Dee Chu; Liping Di; Peter Thornton

2006-01-01T23:59:59.000Z

127

Audit of Electrical System Construction Projects at the Nevada Operations Office, WR-B-97-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ELECTRICAL SYSTEM CONSTRUCTION PROJECTS ELECTRICAL SYSTEM CONSTRUCTION PROJECTS AT THE NEVADA OPERATIONS OFFICE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost-effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/refshelf.html Your comments would be appreciated and can be provided on the Customer Response form attached to the report. This report can be obtained from the U.S. Department of Energy

128

Project Integration Office for the electric and hybrid vehicle R and D program. Eighth progress report, March 1982  

SciTech Connect

The Project Integration Office (PIO) was established to assist the US DOE with the direction and coordination of its multiple electric vehicle and hybrid electric vehicle research programs in order to get the maximum payoff from these research efforts. In addition, the PIO performs objective independent technical and economic studies, analyses and modeling, and maintains a technical information liaison service to facilitate information exchange between the program participants and industry. Progress in each of these activities is reported. (LCL)

Not Available

1982-04-19T23:59:59.000Z

129

Project Assessment (OPA) Homepage | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

OPA Home OPA Home Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov 2012 Project Management Awards Secretary's Award of Excellence Building 51 and Bevatron Demolition Project at LBNLRead More Bevatron 2012 Project Management Awards Secretary's Award of Achievement Daya Bay Reactor Neutrino Detector Project at LBNLRead More Daya Bay 2012 Project Management Awards Federal Project Director of the Year Hannibal Joma, Federal Project Director for the LUSI Project at SLACRead More Hannibal 1 of 2 Print

130

Vehicle Technologies Office Merit Review 2014: Class 8 Truck Freight Efficiency Improvement Project  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Daimler Truck North America LLC at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Class 8 Truck...

131

Vehicle Technologies Office Merit Review 2014: SuperTruck Program: Engine Project Review  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Detroit Diesel Corporation at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about SuperTruck Program...

132

Vehicle Technologies Office Merit Review 2014: Central Texas Fuel Independence Project  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by City of Austin at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Central Texas Fuel...

133

Vehicle Technologies Office Merit Review 2014: California Fleets and Workplace Alternative Fuels Project  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Bay Area Air Quality Management District at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

134

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment DOE/EIS - 0440 Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management, Yuma Field Office U.S. Army Corps of Engineers U.S. Army Garrison Yuma Proving Ground Arizona Department of Environmental Quality Arizona Game and Fish Department December 2012 COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management U.S. Army Corps of Engineers U.S. Army Garrison-Yuma Proving Ground Arizona Department of Environmental Quality

135

An evaluation of known remaining oil resources in the United States: Project on advanced oil recovery and the states. Volume 1  

SciTech Connect

The Interstate Oil and Gas Compact Commission (IOGCC) has conducted a series of studies to evaluate the known, remaining oil resource in twenty-three (23) states. The primary objective of the IOGCC`s effort is to examine the potential impact of an aggressive and focused program of research, development, and demonstration (RD&D) and technology transfer on future oil recovery in the United States. As part of a larger effort by the IOGCC, this report focuses on the potential economic, social, and political benefits of improved oil recovery to the nation as a whole. Individual reports for major oil producing states have been separately published. The individual state reports include California, Illinois, Kansas, Louisiana, New Mexico, Oklahoma, Texas, and Wyoming. The analysis presented in this report is based on the databases and models available in the Tertiary Oil Recovery Information System (TORIS). TORIS is a tested and verified system maintained and operated by the Department of Energy`s Bartlesville Project Office. The TORTS system was used to evaluate over 2,300 major reservoirs in a consistent manner and on an individual basis, the results of which have been aggregated to arrive at the national total.

Not Available

1994-10-01T23:59:59.000Z

136

DOE Office of Indian Energy Project Development and Finance Course Curriculum Terminology Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AC - AC - alternating current. This is the type of electricity that is used in most U.S. households B BIA - The U.S. Department of the Interior's (DOI's) Bureau of Indian Affairs (BIA) BLM - Bureau of Land Management (part of DOI; see previous entry) C CDE - community development entity. Required participant in new market tax credit (NMTC) transactions CSP - concentrating solar power Community-Scale Project - multiple buildings; campuses with a primary purpose of offsetting community energy costs to promote energy self-sufficiency Commercial-Scale Project - a stand-alone project with a primary purpose of generating revenue resulting in financial self-sufficiency D DC - direct current

137

DOE - Office of Legacy Management -- Dow-Detroit Edison Project - MI 0-02  

Office of Legacy Management (LM)

Dow-Detroit Edison Project - MI Dow-Detroit Edison Project - MI 0-02 FUSRAP Considered Sites Site: Dow-Detroit Edison Project (MI.0-02 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Detroit , Michigan MI.0-02-1 Evaluation Year: 1987 MI.0-02-1 Site Operations: Performed reference design work for a special fast breeder type reactor. MI.0-02-1 Site Disposition: Eliminated - No radioactive material handled at the site MI.0-02-1 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None MI.0-02-1 Radiological Survey(s): no Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to Dow-Detroit Edison Project MI.0-02-1 - DOE Memorandum/Checklist; S.Jones to the File; Subject:

138

ASCR Recovery Act Projects | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Miscellaneous » ASCR Recovery Act Projects Miscellaneous » ASCR Recovery Act Projects Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) News & Resources ASCR Discovery Monthly News Roundup News Archives ASCR Program Documents ASCR Workshops and Conferences ASCR Presentations 100Gbps Science Network Related Links Contact Information Advanced Scientific Computing Research U.S. Department of Energy SC-21/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-7486 F: (301) 903-4846 E: sc.ascr@science.doe.gov More Information » Miscellaneous ASCR Recovery Act Projects Print Text Size: A A A RSS Feeds FeedbackShare Page ASCR Recovery Act Projects

139

DOE Office of Environmental Management Project and Contract Management Improvement Timeline  

Energy.gov (U.S. Department of Energy (DOE))

Improving DOE contract and project management is a top priority of the Departments seniormanagement and entire organization. View some highlights of EMs improvementactions here.

140

DOE - Office of Legacy Management -- Dayton Project Units 3 and 4 - OH 07  

NLE Websites -- All DOE Office Websites (Extended Search)

Dayton Project Units 3 and 4 - OH Dayton Project Units 3 and 4 - OH 07 FUSRAP Considered Sites Site: Dayton Project Units 3 & 4 (OH.07 ) U.S. Army Corps of Engineers (FUSRAP) - No Further Action Designated Name: Not Designated Alternate Name: Monsanto Units III and IV Unit III - Board of Education Maintenance Facility Unit IV - Runnymede Playhouse OH.07-1 OH.07-2 OH.07-3 Location: Unit III - 1601 W. First Street Unit IV - Runnymede Road and Dixon Avenue , Dayton , Ohio OH.07-4 OH.07-5 Evaluation Year: 1987 Site Operations: October 1943 to mid-1950 - AEC conducted research and manufactured Polonium by lead dioxide and bismuth processes OH.07-4 Site Disposition: Eliminated - radiation levels below criteria. OH.07-9 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Polonium OH.07-1

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Humanities Projects Announced | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Humanities Projects Announced DOE Humanities Projects Announced Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) News & Resources ASCR Discovery Monthly News Roundup News Archives ASCR Program Documents ASCR Workshops and Conferences ASCR Presentations 100Gbps Science Network Related Links Contact Information Advanced Scientific Computing Research U.S. Department of Energy SC-21/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-7486 F: (301) 903-4846 E: sc.ascr@science.doe.gov More Information » Miscellaneous DOE Humanities Projects Announced Print Text Size: A A A RSS Feeds FeedbackShare Page Last year, the Department of Energy announced a partnership with the

142

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Location: Location: New York Proposed Action or Project Description: American Recovery and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on aero-thermodynamic Inertial separation for use in carbon capture processes.' Categorical Exclusion(s) Applied: x - 83.6 Siting/constructiOnloperationtdecommissioning of facilities for benctrscale research, conventionallaboralory operations, small-scala research and development and pilot projects *-For the complete DOE National Euyironmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRIO 21 [lkk Here lois action vr'Ould not: threaten a violation of applicable statutory, regulatory, or pennit requirements for environment, safety, and health, including OOE andlor Executive Orders;

143

2014 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Projects Agency - Energy (ARPA-E) Office of Environmental Management (EM) Office of Energy Efficiency and Renewable Energy (EERE) Office of Fossil Energy (FE) Office of...

144

Hydropower Projects  

Energy.gov (U.S. Department of Energy (DOE))

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

145

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16) Penn State Univ. - 16) Penn State Univ. - Development of Rhodobacter as a Versatile Microbial Platform for Fuels Production Location: Pennsylvania Proposed Action or Project Description: American Recovcf)' and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on a rhodobacter fuel production platform for use in the production of energy dense, liquid transportation fuels from biological-based non-photosynthetic systems. Categorical Exclusion(s) Applied: x w 83.6 SiUng/constructionloperationldecommission!ng of facilities for bench-scale research, convenUooallaboratory operations. small-scale research and development and pilot projects O+~For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFRIO 21 ('tick Here

146

DOE - Office of Legacy Management -- Project Gas Buggy Site - NM 14  

Office of Legacy Management (LM)

Gas Buggy Site - NM 14 Gas Buggy Site - NM 14 FUSRAP Considered Sites Site: Project Gas Buggy Site (NM.14 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gasbuggy, New Mexico, Site Nevada Test Site History Documents Related to Project Gas Buggy Site Fact Sheet Gasbuggy, New Mexico The Gasbuggy Site is located in northwestern New Mexico in Rio Arriba County approximately 55 miles east of the city of Farmington and approximately 12 miles southwest of Dulce, New Mexico, in the Carson National Forest. Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico, December 1993.

147

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) Regents of the Univ. of California - 3) Regents of the Univ. of California - Electro-Autotrophic Synthesis of Higher Alcohols Location: California Proposed Action or Project Description: American Recovery and Reinvestment Act: 181 Funding will support laboratory and bench scale research and development on electro-autotrophic synthesis for use in the production of energy dense, liquid transpcrtatlon fuels from biological-based non-photosynthetic systems. Categorical Exclusion(s) Applied: x - 83.6 SitingJoonstructlonfoperationldecommissioning of facilities for bench-scale research, conventionallaboralory operations, small-scale research and development and pilot projects *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of to CFRlO 21 Click I !ere

148

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Ag  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project T Project T itle: (02 06- 1565) Columbia - Biofue ls from C02 using Amm onia-Oxid izing Bacte ria in a Reve rse Microbi a l Fue l Cell L ocati on: New Y ork Pr oposed Action or Proj ect Description: American Recovery and Reinvestment Act: D Funding will support in-lab R&D activities involving liquid biofuel production from biological-based non-photosynthetic systems. Proposed work consists of (1) initial testing and genetic modification of ammonia-oxidizing and iron-oxidizing bacteria used to produce liquid biofuel and (2) development and optimization of a reverse microbial fuel cel l. All proposed work will take place on the Columbia University campus in New York, NY. Categorical Exciusi on(s) Applied: x - 83.6 Siting/construction/operation/decommissioning of facilities for bench-scale research, conventional laboratory operations, small-scale research and developme

149

DOE - Office of Legacy Management -- Project Rulison - CO 0-10  

Office of Legacy Management (LM)

Rulison - CO 0-10 Rulison - CO 0-10 FUSRAP Considered Sites Site: PROJECT RULISON (CO.0-10) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Southwest limb of the Piceance Creek Basin , Garfield County , Colorado CO.0-10-1 Evaluation Year: 1985 CO.0-10-1 Site Operations: The project was a Plowshare experiment conducted from 1969-1971 to determine the commercial feasibility of nuclear stimulation of natural gas reservoirs. CO.0-10-1 Site Disposition: Eliminated - Radiation levels below criteria CO.0-10-1 Radioactive Materials Handled: Yes CO.0-10-1 Primary Radioactive Materials Handled: No Surface Contamination; Underground Detonation Circa 1969 CO.0-10-1 Radiological Survey(s): Yes - health and safety monitoring as well as periodic hydrologic surveillance CO.0-10-1

150

Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project  

SciTech Connect

As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

Sheppy, M.; Metzger, I.; Cutler, D.; Holland, G.; Hanada, A.

2014-01-01T23:59:59.000Z

151

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Ag  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pro Pro ject Title: (02 06-1510) UMass - Electrofu els via Direct Electron Transfer from Electrod es to Microbes" Location: *- Multiple States - California, Massachusetts Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support R&D activities involving microbial electrosynthesis of liquid biofuel and biofu el precursors in in-lab and meso-scale bioreactors. Proposed work consists of increasing liquid biofuel and biofuel precursor production in three target microbes usi ng adaptive evolution, genetic engineering , and metabolic modeling techniques at UMass's research facilities in Amhearst, MA. Proposed work also consists of designing, fabricating, and optimizing three in-lab bioreactors and one meso-scale bioreactor at Genomatica, Inc.

152

Categorical Exclusion Determination Form Program or Field Office: Advanced Research Projects Agency -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L L ocation: *- Multiple States - New York, Pennsylvania Proposed Action or Project Description: American Recovery and Reinvestment Act: D Funding will support small-scale laboratory research , design, fabrication and pilot-sca le testing of the Inertial C02 Extraction System (ICES), an aero-thermodynamic inertial separation device for use in carbon capture processes. Funding will also support computationa l and performance modeling, econom ic modeling, and commercialization/transition planning for the IC ES system under development. Proposed work consists of (1) R&D tasks to be completed in laboratory, fabrication and testing facilities located at ATK's GAS L testing and research center in Ronkonkoma, NY, (2) Technical performance modeling and design work at Acent Laboratories in Manorville, NY, and

153

DOE Office of Indian Energy Provides Tribes with Hands-On Support to Advance Tribal Energy Projects, Fall 2012 (Newsletter)  

SciTech Connect

This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Fall 2012.

Not Available

2012-10-01T23:59:59.000Z

154

Office of the Chief Financial Officer Annual Report 2009  

SciTech Connect

Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

Fernandez, Jeffrey

2009-12-15T23:59:59.000Z

155

Office of the Chief Financial Officer 2012 Annual Report  

E-Print Network (OSTI)

by the Director, Office of Science of the U.S. Department oframp down of DOE Office of Science construc- tion projects.Slight decreases in Offices of Science and Energy Efficiency

Williams, Kim

2014-01-01T23:59:59.000Z

156

Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997--April 1998  

SciTech Connect

This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO`s on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County.

NONE

1998-07-01T23:59:59.000Z

157

Vehicle Technologies Office Merit Review 2014: Enabling Materials for High Temperature Power Electronics (Agreement ID:26461) Project ID:18516  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about enabling...

158

Vehicle Technologies Office Merit Review 2014: Friction Reduction through Surface Modification (Agreement ID:23284) Project ID:18518  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about friction...

159

Vehicle Technologies Office Merit Review 2014: Materials Issues Associated with EGR Systems (Agreement ID:18571) Project ID:18518  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about materials...

160

Independent Oversight Inspection, Richland Operations Office, Office of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office, Richland Operations Office, Office of River Protection, and Project Hanford Management Contract - November 2006 Independent Oversight Inspection, Richland Operations Office, Office of River Protection, and Project Hanford Management Contract - November 2006 November 2006 Inspection of Classification and Information Control Programs at the Richland Operations Office, Office of River Protection, and Project Hanford Management Contract This report presents the results of inspection activities by the U.S. Department of Energy (DOE) Office of Independent Oversight, Office of Security Evaluations in the area of classification and information control (CIC) at the two DOE offices at the Hanford Site-the Richland Operations Office (RL) and the Office of River Protection (ORP)-each of which

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

UNESCO office in Iraq Conservation of Erbil Citadel  

E-Print Network (OSTI)

UNESCO office in Iraq Conservation of Erbil Citadel Iraq Assessment was organised by the: UNESCO office in Iraq and the: HCECR High Commission for Erbil Citadel architect UNESCO office in Iraq: Mourad Zmit, Project manager May Shaer, Field Project Officer

Boyer, Edmond

162

Portsmouth Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

for enriched uranium. In December 2002, the United States Enrichment Corporation (USEC) announced it would construct a centrifuge uranium enrichment demonstration facility,...

163

Portsmouth Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

process equipment, and removal of PCB and lube oils. The United States Enrichment Corporation (USEC) is currently performing Cold Shutdown work activities under contract to DOE....

164

Portsmouth Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Restoration Scrap Metal Inactive Facility Removal Legacy Waste Gas Centrifuge Plant-GCEP Tc-99 Cleaning Cold Shutdown D&D Planning and Future Vision Uranium Management Center...

165

Portsmouth Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2006 X-230J-1 Environmental Monitoring Station...Feb 23, 2006 X-740 Waste Oil Storage Facility...Feb 28, 2006 X-106B Old Fire Training...

166

Portsmouth Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

CAREERS PPPO Careers USA Jobs LINKS DOE Links ProcurementSolicitations Paducah GDP Deactivation PPPO Contractors Contractor Employee Concerns External Regulators Glossary of Terms...

167

SS OO UU TT HH AA FF RR II CC AA SS QQ UU AA RR EE KK II LL OO MM EE TT RR EE AA RR RR AA YY SKA South Africa Project Office  

E-Print Network (OSTI)

South Africa Project Office 05 July 2012 BIDS AWARDED PROCUREMENT OF VEHICLES FOR THE OPERATION@ska.ac.za 1st Floor 17 Baker Street Rosebank Johannesburg South Africa 2196 Tel: +27 (0) 11 442 2434 Fax: +27

Jarrett, Thomas H.

168

Vehicle Technologies Office Merit Review 2014: Biofuel Impacts on Aftertreatment Devices (Agreement ID:26463) Project ID:18519  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about biofuel impacts...

169

Vehicle Technologies Office Merit Review 2014: Materials for Advanced Turbocharger Designs (Agreement ID:17257) Project ID:18518  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about materials for...

170

Vehicle Technologies Office Merit Review 2014: Applied ICME for New Propulsion Materials (Agreement ID:26391) Project ID:18865  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about applied ICME...

171

Project Tracking System (PTS) user's manual  

SciTech Connect

The Bartlesville Energy Technology Center (BETC) Project Tracking System (PTS) is a computerized information system developed to generate automatic updates to other Department of Energy (DOE) systems such as the Business Management Information System (BMIS), as well as to aid in the in-house tracking of the cost, schedule, and manpower status of the approximately 200 BETC contracts. The PTS data base contains administrative and limited technical information on planned, active, and terminated contracts. The PTS software and data base are resident upon BETC's PDP 11/70 computer, which utilizes the RSX-11M operating system. PTS programming was done in the BASIC + II and DATA-TRIEVE languages, which allow for conversational, English-like interactions between the user and the system during both input and output sessions.

Mohr, E.B.

1981-03-01T23:59:59.000Z

172

Building Technologies Office: Integrated Predictive Demand Response  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Predictive Integrated Predictive Demand Response Controller Research Project to someone by E-mail Share Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Facebook Tweet about Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Twitter Bookmark Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Google Bookmark Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Delicious Rank Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on Digg Find More places to share Building Technologies Office: Integrated Predictive Demand Response Controller Research Project on AddThis.com...

173

Building Technologies Office: Integrated Building Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Building Integrated Building Management System Research Project to someone by E-mail Share Building Technologies Office: Integrated Building Management System Research Project on Facebook Tweet about Building Technologies Office: Integrated Building Management System Research Project on Twitter Bookmark Building Technologies Office: Integrated Building Management System Research Project on Google Bookmark Building Technologies Office: Integrated Building Management System Research Project on Delicious Rank Building Technologies Office: Integrated Building Management System Research Project on Digg Find More places to share Building Technologies Office: Integrated Building Management System Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

174

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

NLE Websites -- All DOE Office Websites (Extended Search)

CHEMICAL & MICROBIAL CHEMICAL & MICROBIAL PARAFFIN CONTROL PROJECT DECEMBER 17, 1997 FC9544 / 96PT12 RMOTC Test Report Paraffin Control Project BDM Oklahoma/NIPER 220 N. Virginia Bartlesville, OK 4003 918-336-2400, FAX 918-337-4365 Leo Giangiacomo, Project Manager Rocky Mountain Oilfield Testing Center December 17. 1997 Abstract This report summarizes the field performance results of a comparison of chemical and microbial paraffin control systems. The two systems were selected from laboratory screening work. Well selection was based on production rates, produced fluids, and prior paraffin treatments. The treatments were performed on similar groups of wells over the same period of time, using quantities and techniques recommended by the supplier specifically for the wells to be treated. The tests were conducted by the U. S. Department of

175

TO: Procurement Directors/Contracting Officers FROM: ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 DATE: June 17, 2014 TO: Procurement DirectorsContracting Officers FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management...

176

2013 Annual Report -- Geothermal Technologies Office | Department...  

Office of Environmental Management (EM)

for an EGS field site project, called FORGE -- the Frontier Observatory for Research in Geothermal Energy -- after an intense, intra-office competition. The Office also had gains...

177

Office of Electricity Delivery and Energy Reliability Cyber Security...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections On...

178

Using CORE Model-Based Systems Engineering Software to Support Program Management in the U.S. Department of Energy Office of the Biomass Project: Preprint  

SciTech Connect

This paper describes how a model-based systems engineering software, CORE, is helping the U. S. Department of Energy's Office of Biomass Program assist with bringing biomass-derived biofuels to the market. This software tool provides information to guide informed decision-making as biomass-to-biofuels systems are advanced from concept to commercial adoption. It facilitates management and communication of program status by automatically generating custom reports, Gantt charts, and tables using the widely available programs of Microsoft Word, Project and Excel.

Riley, C.; Sandor, D.; Simpkins, P.

2006-11-01T23:59:59.000Z

179

Vehicle Technologies Office Merit Review 2014: The Voltage Fade Project, A New Paradigm for Applied Battery Research  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by the Department of Energy's Energy Storage area at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about a new approach to the challenge of voltage fade in batteries for plug-in electric vehicles.

180

Program or Field Office: Office of Legacy Management Project Title and I.D. No.: Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, LM 13-13 Location: Largo, Florida Proposed Action or Project Description: DOE proposes to use a Geoprobe to inject emulsified edible soybean oil (EEO) and anaerobic microbial solution into the surficial aquifer at the 4.5 Acre Site adjacent to the DOE Young - Rainey STAR Center (Pinellas Site) in Largo, Florida. The proposed action would enhance naturally occurring anaerobic biodegradation, thereby reducing vinyl chloride contamination along the southwest boundary of the 4.5 Acre Site. Dehalococcoides ethenogenes (DHE) is a type of microbe that occurs naturally in the aquifer. Bioaugmentation with a commercially available DHE culture used in conjunction with the EEO would maximize the efficiency of contaminant biodegradation. No genetically engineered or

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Vehicle Technologies Office: News  

NLE Websites -- All DOE Office Websites (Extended Search)

News News Site Map Printable Version Share this resource Send a link to Vehicle Technologies Office: News to someone by E-mail Share Vehicle Technologies Office: News on Facebook Tweet about Vehicle Technologies Office: News on Twitter Bookmark Vehicle Technologies Office: News on Google Bookmark Vehicle Technologies Office: News on Delicious Rank Vehicle Technologies Office: News on Digg Find More places to share Vehicle Technologies Office: News on AddThis.com... Vehicle Technologies News Blog Newsletters Information for Media Subscribe to News Updates News December 18, 2013 USDA Offers $118 Million for Renewable Energy, Smart Grid Projects The U.S. Department of Agriculture (USDA) announced $73 million in funding for renewable energy projects and $45 million for smart grid technology as

182

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Freedom of Information and Privacy Act Database Freedom of Information and Privacy Act Database Bureau: DOE-ID Project Unique ID: Date: May 8,2008 A. CONTACT INFORMATION 1. Who is the person completing this document? Nicole Brooks Title: FOIA/PA Officer Organization: DOE-ID Public Affairs Office Address: 1955 N. Fremont Ave, MS 1203 Idaho Falls, Idaho 83415 2. Who is the system owner? Nicole Brooks, FOIA/PA Officer U.S. DOE, Idaho Operations Office DOE-ID Public Affairs Office Address: 1955 N. Fremont Ave, MS 1203 Idaho Falls, Idaho 834 15 3. Who is the system manager for this system o r application? Nicole Brooks, FOIA/PA Officer U.S. DOE, Idaho Operations Office DOE-ID Public Affairs Office Address: 1955 N. Fremont Ave, MS 1203 Idaho Falls, Idaho 83415 4. Who is the IT Security Manager who reviewed this document?

183

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Personnel Management (OPM) Billing System Office of Personnel Management (OPM) Billing System Bureau: Department of Energy Project Unique ID: 01 9-1 0-01 -22-02-3048-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.2 l), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS- 1.2 1, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

184

Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program  

SciTech Connect

In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

Not Available

1992-12-01T23:59:59.000Z

185

Independent Oversight Assessment, Portsmouth/Paducah Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Office - May 2012 May 2012 Assessment of the PortsmouthPaducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants...

186

Application of the office of civilian radioactive waste management QA requirements to the hanford spent nuclear fuel project  

SciTech Connect

This document identifies, at a high-level, the Hanford SNF Project systems, structures, and components and activities that must implement to some degree the OCRWM QARD requirements to ensure compliance with RL direction. This document will also be used to support development of a QARD requirements matrix for the implementation of QARD requirements.

MCCORMACK, R.L.

1999-05-12T23:59:59.000Z

187

DOE NEPA Compliance Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Compliance Officers NEPA Compliance Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. Please send updates to yardena.mansoor@hq.doe.gov Oct 04, 2013 Forrestal (FORS) Addresses: Germantown (GTN) Addresses: 1000 Independence Ave SW 1000 Independence Ave SW Washington, DC 20585 Washington, DC 20585-1290 . Use for U.S. Postal Service mail. 19901 Germantown Road Germantown, MD 20874-1290 Use for EXPRESS DELIVERY (e.g. Federal Express, UPS). NAME, OFFICE, E-MAIL FAX ADDRESS PHONE william.bierbower@hq.doe.gov Advanced Research Projects Agency-Energy 202-287-6585 FORS AR-1 20585 ARPA-E William Bierbower lori.gray@go.doe.gov Energy Efficiency and Renewable Energy, Golden Field Office 720-356-1568 720-356-1350 Department of Energy

188

Marine and Hydrokinetic Energy Projects  

Energy.gov (U.S. Department of Energy (DOE))

This report covers the Wind and Water Power Technologies Offices marine and hydrokinetic projects from fiscal years 2008 to 2014.

189

Project Tracking System (PTS). User's manual and program documentation  

SciTech Connect

The Bartlesville Energy Technology Center (BETC) Project Tracking System (PTS) is a computerized information system developed to generate automatic updates to other Department of Energy (DOE) systems such as the Business Management Information System (BMIS), as well as to aid in the in-house tracking of the cost, schedule, and manpower status of the approximately 200 BETC contracts. The PTS data base contains administrative and limited technical information on planned, active, and terminated contracts. The PTS software and data base are resident upon BETC's PDP 11/70 computer, which utilizes the RSX-11M operating system. PTS programming was done in the BASIC + II and DATATRIEVE languages, which allow for conversational, English-like interactions between the user and the system during both input and output sessions.

Not Available

1983-11-01T23:59:59.000Z

190

SS OO UU TT HH AA FF RR II CC AA SS QQ UU AA RR EE KK II LL OO MM EE TT RR EE AA RR RR AA YY SKA South Africa Project Office  

E-Print Network (OSTI)

South Africa Project Office 12 March 2012 BIDS AWARDED CIVIL WORKS FOR THE CONSTRUCTION OF ROADS@ska.ac.za / mabela@ska.ac.za 1st Floor 17 Baker Street Rosebank Johannesburg South Africa 2196 Tel: +27 (0) 11 442

Jarrett, Thomas H.

191

SS OO UU TT HH AA FF RR II CC AA SS QQ UU AA RR EE KK II LL OO MM EE TT RR EE AA RR RR AA YY SKA South Africa Project Office  

E-Print Network (OSTI)

South Africa Project Office 04 July 2012 BIDS AWARDED KAT 7 AND MEERKAT BUILDING MANAGEMENT SYSTEM, 2 March 2012 at 11:00 Name of the Successful Bidders: Schneider- Electric South Africa Ceiling Price: tcheetham@ska.ac.za / mabela@ska.ac.za 1st Floor 17 Baker Street Rosebank Johannesburg South Africa 2196 Tel

Jarrett, Thomas H.

192

SS OO UU TT HH AA FF RR II CC AA SS QQ UU AA RR EE KK II LL OO MM EE TT RR EE AA RR RR AA YY SKA South Africa Project Office  

E-Print Network (OSTI)

South Africa Project Office 1st Floor The Park 17 Baker Street 3rd Floor Rosebank Park Rd Johannesburg Pinelands South Africa South Africa 2196 7405 Tel: +27 (0) 11 442 2434 +27 (0)21 506 7300 Fax: +27 (0) 11

Jarrett, Thomas H.

193

Fuel Cell Technologies Office Multi-Year Research, Development...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

D: Project Evaluation Form Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Appendix D: Project Evaluation Form Appendix D: Project...

194

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Bureau of Investigations Billing System Federal Bureau of Investigations Billing System Bureau: Department of Energy Project Unique ID: 01 9-10-01 -22-02-3028-00 Date: 02/08/2008 A. CONTACT INFORMATION 1) Who is the person completing this document? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 2) Who is the system owner? Joanne Csordas (HS-1.21), Office of Business Operations, Office of Resource Management, Office of Health, Safety and Security, U.S. Department of Energy, HS-1.21, 1000 Independence Avenue, SW, Washington D.C. 20585, (301) 903-3573 3) Who is the system manager for this system or application?

195

Building Technologies Office: Harmonization of Wireless Dimming Lighting  

NLE Websites -- All DOE Office Websites (Extended Search)

Harmonization of Harmonization of Wireless Dimming Lighting Controls Research Project to someone by E-mail Share Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Facebook Tweet about Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Twitter Bookmark Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Google Bookmark Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Delicious Rank Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on Digg Find More places to share Building Technologies Office: Harmonization of Wireless Dimming Lighting Controls Research Project on

196

Building Technologies Office: Integrated Whole-Building Energy Diagnostics  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Integrated Whole-Building Energy Diagnostics Research Project to someone by E-mail Share Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Facebook Tweet about Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Twitter Bookmark Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Google Bookmark Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Delicious Rank Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on Digg Find More places to share Building Technologies Office: Integrated Whole-Building Energy Diagnostics Research Project on AddThis.com...

197

Building Technologies Office: HVAC Optimized Heat Exchangers Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimized Heat Optimized Heat Exchangers Research Project to someone by E-mail Share Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Facebook Tweet about Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Twitter Bookmark Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Google Bookmark Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Delicious Rank Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on Digg Find More places to share Building Technologies Office: HVAC Optimized Heat Exchangers Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research

198

Building Technologies Office: Energy-Efficient Window Air Conditioner  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy-Efficient Window Energy-Efficient Window Air Conditioner Ratings Research Project to someone by E-mail Share Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Facebook Tweet about Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Twitter Bookmark Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Google Bookmark Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Delicious Rank Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on Digg Find More places to share Building Technologies Office: Energy-Efficient Window Air Conditioner Ratings Research Project on

199

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

200

Projects | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Projects All 1703 1705 ATVM Current Portfolio 32.4 B in Loans 55 K Jobs Current Portfolio Loans 32.4 B Jobs 55,000 Loan Program Office Projects 1703 1705 ATVM...

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

2013 Annual Planning Summary for the Oak Ridge Office | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Annual Planning Summary for the Oak Ridge Office 2013 Annual Planning Summary for the Oak Ridge Office The ongoing and projected Environmental Assessments and Environmental...

202

Business System Clause - Berta Schreiber, Dir, Office of Policy...  

Office of Environmental Management (EM)

Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) 2014 DOE Project Management Workshop Business System Clause - Berta Schreiber, Dir, Office of Policy...

203

TO: Procurement Directors/Contracting Officers FROM: Director  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

51 DATE: June 22, 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Acquisition and Project Management...

204

2015 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Collaborations + Options Collaborations Advanced Research Projects Agency - Energy (ARPA-E) Office of Environmental Management (EM) Office of Energy Efficiency and...

205

Independent Activity Report, Los Alamos Site Office - December...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2010 Los Alamos Site Office, Office of Quality Assurance Assessment of the Chemistry and Metallurgy Research Building Replacement Project Quality Assurance Plan The U.S....

206

2011 Awards for Project Management | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Support Facility Project (Office of Energy Efficiency and Renewable Energy) Spallation Neutron Source Instruments - Next Generation Project (Office of Science) Ion Beam Laboratory...

207

Building Technologies Office: High Efficiency, Low Emission Supermarket  

NLE Websites -- All DOE Office Websites (Extended Search)

High Efficiency, Low High Efficiency, Low Emission Supermarket Refrigeration Research Project to someone by E-mail Share Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Facebook Tweet about Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Twitter Bookmark Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Google Bookmark Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Delicious Rank Building Technologies Office: High Efficiency, Low Emission Supermarket Refrigeration Research Project on Digg Find More places to share Building Technologies Office: High

208

2012 Quality Assurance Improvement Project Plan | Department...  

Office of Environmental Management (EM)

2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of...

209

Environmental Wind Projects | Department of Energy  

Energy Savers (EERE)

Wind Projects Environmental Wind Projects This report covers the Wind and Water Power Technologies Office's environmental wind projects from fiscal years 2006 to 2014....

210

Workforce Development Wind Projects | Department of Energy  

Energy Savers (EERE)

Workforce Development Wind Projects Workforce Development Wind Projects This report covers the Wind and Water Power Technologies Office's workforce development wind projects from...

211

Environmental Wind Projects | Department of Energy  

Energy Savers (EERE)

Environmental Wind Projects Environmental Wind Projects This report covers the Wind and Water Power Technologies Office's environmental wind projects from fiscal years 2006 to...

212

Program or Field Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office : Project Title and 1.0. No.: Location: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Surface Water and Groundwater Sampling Near the Naturita, Colorado Title I Uranium Mill Tailings Radiation Control Act (UMTRCA) Processing Site. LM # 09-12 . Naturita, Colorado Proposed Action or Project Description : DOE proposes to sample water from nine different locations in an area near the former Naturita processing site to assess the extent of groundwater contamination and the effectiveness of existing institutional controls . The area under evaluation is located on private property about 3 miles northwest of the town of Naturita . Water samples would be taken from three surface water locations and six groundwater locations. For five of the groundwater sampling locations a Geoprobe rig

213

DOE/EA-1338: Finding of No Significant Impact Transfer of the Department of Energy Grand Junction Project Office To Non-DOE Ownership (04/25/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 F I N A L Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy * Grand Junction Office * 2597 B ¾ Road * Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final DOE/EA-1338 FINAL Environmental Assessment for the Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership April 2000 U.S. Department of Energy Grand Junction Office 2597 B ¾ Road Grand Junction, CO 81503 Grand Junction Office Environmental Assessment Final i April 2000 TABLE OF CONTENTS Title Page Table of Contents ......................................................................................................................................... i List of Figures ............................................................................................................................................iii

214

Capital Projects Delivery Procedures Manual  

E-Print Network (OSTI)

1 Capital Projects Delivery Procedures Manual September 4, 2008 Office of the CFO #12;2 Page I of the Capital Budget 11 B. Budget Approval 12 C. Setting Up Capital Projects 13 III. Procedures for Design ­ Office of the Chief Financial Officer Financial Policies and Procedures for the Capital Project Delivery

Alpay, S. Pamir

215

Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project  

Energy.gov (U.S. Department of Energy (DOE))

The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River.

216

Badge Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Badge Office Badge Office Badge Office The central point where badges are issued to employees and official visitors. Contact Badge Office (505) 667-6901 Email Badge Office location As the central point where badges are issued to employees and official visitors, the Badge Office is located on the second floor of the Otowi Building (TA-3, Bldg. 261). Badge Office map Printable 2-page map to the Badge Office (pdf) More maps and directions Badge Office hours Monday-Friday: 7:30 am - 4 pm Wednesday: Closed 11 am - 12:30 pm Badge requirements US citizen employees must present a photo ID and proof of US citizenship. See Security Smart on Proof of United States Citizenship for the Badge Office (pdf). Foreign national guests and employees must have an approved visit and present a valid passport and documentation of US legal status and work

217

NEPA Compliance Officer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Officer Compliance Officer Award #: EE 000 0784 Recipient: County of Escambia ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) MC Blanchard Judicial Center B5.1 Historic Preservation Clause and Old Courthouse Block Waste Stream Clause Office Complex EEIP Road Prison Geothermal Earth Coupled HVAC Upgrade A9, All Allowable Activities: Information gathering, data collection, reporting, and preliminary design. Prohibited Activities: Implementation of final design, construction, and operation tasks for this project should be conditioned pending further NEPA review. Landfill Gas Extraction and Control System A9, All Allowable Activities: Information gathering,

218

Project Management Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

219

California Fleets and Workplace Alternative Fuels Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

information. 2014 DOE Vehicle Technologies Office Review Presentation Damian Breen Deputy Air Pollution Control Officer Bay Area Air Quality Management District Project ID: TI035...

220

FieldOffice Project # Applicant  

E-Print Network (OSTI)

photovoltaic (Opal) T.2N, R9E &R10E Rec'd cost recovery funds. w/in 29 Palms segregation area. Rec'd POD to Harper ACEC (exclusion) 585 Solar: pending photovoltaic (Desert Onyx) T11N, R3 & 4W Received cost to Johnson Valley OHV Area 500 Solar: pending photovoltaic (Amber) T4N,R3, R4E &R5E Cost Recovery needed

Laughlin, Robert B.

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Office of Energy Project Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Gen Eng Dotson, B., Gen Eng Nardozzi, D., Gen Eng Parker, W., Gen Eng Robinson II, J., Phy Sci Power & Vehicles Technologies Division 726D020000 (520) Dir: Hinkle, H. Aristegui,...

222

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Many families in the nineteenth century consisted of more than just a nuclear family of parents and their children. In this case Eliza and six Clark children, from ages 6-21, are...

223

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

National Science Bowl Draws Two Area Schools Calloway County Middle School and Lone Oak High School will compete starting this weekend in the Department of Energy's National...

224

Portsmoulh/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

material DMSA U.S. Department of Energy Material Storage Area Fiss fissile ID identification LLW low-level waste PACM presumed asbestos-containing material PCB ...

225

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

briefings and monthly site-wide safety meetings. Duff said the milestone exemplifies Conduct of Operations, the disciplined way LATA employees work safely at the Paducah Site,...

226

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

hypothesized the problem stemmed from water runoff from a nearby storage yard containing depleted uranium hexafluoride (DUF 6 ) cylinders, some of which are covered with paint...

227

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

and a concrete drain. This foundation is interpreted to be a commercial automotive repair garage. 41 Most of the North Shyville Farmstead foundations appear to date to the...

228

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

UTM pOint) F Report ing Information i . Investigation Type (select as many as approp ria te): Repo ried Exarnination of Collection Suriace Collection AugerSoi l Corer...

229

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

April 24, 2013 Robert.Smith@lex.doe.gov Calloway, Gatton Competing in DOE National Science Bowl PADUCAH, KY-Calloway County Middle School of Murray and Bowling Green-based Gatton...

230

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

August 24, 2012 Robert.Smith@lex.doe.gov DOE Dunking Booth Helps Paducah Charities PADUCAH, KY - The Department of Energy (DOE) and its Paducah contractors have raised nearly...

231

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

NEWS MEDIA CONTACT: FOR IMMEDIATE RELEASE Robert Smith (270) 441-6821 April 4, 2012 robert.smith@lex.doe.gov Southwest Plume Cleanup to Start By Summer 2013 At DOE's Paducah Site...

232

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2012 Robert.Smith@lex.doe.gov New Signs Direct Recreational Use of Land at DOE's Paducah Site New signs are intended to help the public understand the expanded use of public...

233

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Jan. 31, 2013 Robert.Smith@lex.doe.gov DOE Regional Science Bowl set for Feb. 8, 15 PADUCAH, KY - The U.S. Department of Energy will hold its fourth Regional Science Bowl Feb. 8...

234

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2013 Robert.Smith@lex.doe.gov Gatton Academy Wins DOE Regional Science Bowl PADUCAH, KY - Gatton Academy of Mathematics and Science won the U.S. Department of Energy's fourth...

235

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2012 Robert.Smith@lex.doe.gov Eco Fair Blends Fun and Facts for Paducah Area Middle Schoolers PADUCAH, KY - Lone Oak Middle School student Trevor Tilley was impressed with a 3 rd...

236

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

FOR IMMEDIATE RELEASE Buz Smith (270) 441-6821 January 30, 2012 Robert.Smith@lex.doe.gov Department of Energy Hosting Paducah Regional Science Bowl PADUCAH, KY - The U.S....

237

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb. 21, 2013 Robert.Smith@lex.doe.gov Metals Plant Removal Boosts DOE Paducah Site Cleanup PADUCAH, KY-Cleanup efforts at the Department of Energy's (DOE) Paducah Site have taken...

238

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

May 4, 2012 Robert.Smith@lex.doe.gov Calloway Middle School Honored at DOE National Science Bowl -Lone Oak Competes Among High Schools- Calloway County Middle School won the...

239

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2013 Robert.Smith@lex.doe.gov Calloway Middle wins second straight DOE Regional Science Bowl PADUCAH, KY - Calloway County Middle School won the U.S. Department of Energy's...

240

Portsmouth/Paducah Project Office  

NLE Websites -- All DOE Office Websites (Extended Search)

May 8, 2013 Robert.Smith@lex.doe.gov Calloway, Gatton Succeed at DOE National Science Bowl Calloway County Middle School of Murray finished 7 th in engineering design for its...

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Portsmouth/Paducah Project Office,  

NLE Websites -- All DOE Office Websites (Extended Search)

28, 2012 About 900 high school students, educators attend third annual DOE Science Alliance PIKETON, OH The U.S. Department of Energy (DOE) welcomed about 900 high school...

242

Golden Field Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3393 FINDING OF NO SIGNIFICANT IMPACT UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT - CASTINE DOE/EA-1792-S1 AGENCY: U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The U.S. Department of Energy (DOE) has completed a Supplemental Environmental Assessment (Supplemental EA) DOE/EA-1792-S1 for the University of Maine's (UMaine) Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project - Castine. DOE prepared the Supplemental EA to evaluate the potential environmental impacts of

243

Project Management Methodology  

Energy.gov (U.S. Department of Energy (DOE))

The Project Management Coordination Office (PMCO) provides the tools and guidance necessary to ensure consistent and effective management oversight of performer performance and consolidated...

244

Western Gas Sands Project. Status report, 1 March-31 March 1980  

SciTech Connect

The March, 1980 progress of the government-sponsored projects directed towards increasing gas production from the low permeability gas sands of the western United States is summarized in this report. A site for the multi-well experiment was approved by the industry review committee; drilling is expected by mid-summer. Bartlesville Energy Technology Center continued work on fracture conductivity, rock/fluid interaction, and log evaluation and interpretation techniques. Lawrence Livermore Laboratory continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. Analysis of data obtained from a test of the borehole seismic unit by Sandia Laboratories continued. The DOE Well Test Facility continued bottom-hole pressure buildup measurements at the Colorado Interstate Gas Company Miller No. 1 well.

Not Available

1980-01-01T23:59:59.000Z

245

Campus Sustainability Office Campus Planning Office  

E-Print Network (OSTI)

Campus Sustainability Office (CSO) Campus Planning Office (CPO) Campus Sustainability Manager (Molly Bressers) Campus Sustainability Office and Campus Planning Office September 2014 Student Employee

Caughman, John

246

Project Structure Elke Karrenberg  

E-Print Network (OSTI)

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

247

2014 Annual Planning Summary for the NNSA Sandia Field Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the NNSA Sandia Field Office.

248

2014 Annual Planning Summary for the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Environmental Management.

249

2014 Annual Planning Summary for the NNSA Production Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the NNSA Production Office.

250

The Energy Department's Geothermal Technologies Office Releases 2013 Annual Report  

Energy.gov (U.S. Department of Energy (DOE))

The 2013 Annual Report: featuring highlights and accomplishments in the Office's portfolio of projects is now available!

251

2014 Annual Planning Summary for the Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Legacy Management..

252

2013 Annual Planning Summary for the Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Office of Legacy Management .

253

2013 Annual Planning Summary for the Ames Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within theAmes Site Office.

254

2011 Annual Planning Summary for Livermore Site Office (LSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Livermore Site Office (LSO).

255

2014 Annual Planning Summary for the Nevada Field Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Nevada Field Office.

256

2013 Annual Planning Summary for the Argonne Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within theArgonne Site Office

257

2013 Annual Planning Summary for the Carlsbad Field Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within theCarlsbad Field Office.

258

2012 Annual Planning Summary for Livermore Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Livermore Site Office.

259

2012 Annual Planning Summary for Thomas Jefferson Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Thomas Jefferson Site Office.

260

2013 Annual Planning Summary for the Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Princeton Site Office.

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

2011 Annual Planning Summary for Princeton Site Office (PSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Princeton Site Office (PSO).

262

2014 Annual Planning Summary for the Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Princeton Site Office.

263

2012 Annual Planning Summary for Princeton Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Princeton Site Office.

264

2012 Annual Planning Summary for Fermi Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Fermi Site Office.

265

2013 Annual Planning Summary for the FERMI Site Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the FERMI Site Office.

266

SECRETARY'S OFFICE  

Science Journals Connector (OSTI)

SECRETARY'S OFFICE ... This is especially true with respect to reference hooks and magazines in the field of science. ...

1958-09-15T23:59:59.000Z

267

Annual Planning Summaries By Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Planning Summaries By Office Annual Planning Summaries By Office Annual Planning Summaries By Office SECRETARIAL OFFICES Advanced Research and Projects Agency (ARPA-E) Electricity Delivery and Energy Reliability (OE) Energy Efficiency and Renewable Energy (EE) Environmental Management (EM) Fossil Energy (FE) Health, Safety and Security (HSS) Intelligence and Counterintelligence (IN) Legacy Management (LM) Loan Programs Office (LPO) Nuclear Energy (NE) Science (SC) POWER MARKETING ADMINISTRATIONS Bonneville Power Administration (BPA) Southeastern Power Administration (SEPA) Southwestern Power Administration (SWPA) Western Area Power Administration (WAPA) DOE FIELD OFFICES Ames Site Office (ASO) Argonne Site Office (See SC APS) Berkeley Site Office (BSO) Brookhaven Site Office (BHSO) (See SC APS)

268

State Historic Preservation Office Concurrence Letter | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

California Related to EA-1798: Loan Guarantee to Mojave Solar, LLC for the Abengoa Mojave Solar Project near Barstow, California State Historic Preservation Office Concurrence...

269

Independent Activity Report, Richland Operations Office - August...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2011 Independent Activity Report, Richland Operations Office - August 2011 August 2011 Hanford Sludge Treatment Project HIAR-RL-2011-08-25 This Independent Activity Report...

270

Independent Activity Report, Richland Operations Office - April...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project HIAR-RL-2011-04-07 This Independent Activity Report...

271

Office of Information Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications CERTIFICATE OF AUTHENTICITY Office of Information Resources U.S. Offshore Wind Advanced Technology Demonstration Projects Public Meeting Transcript for...

272

Building Technologies Office: Sensor Suitcase for Small Commercial Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Sensor Suitcase for Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project to someone by E-mail Share Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Facebook Tweet about Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Twitter Bookmark Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Google Bookmark Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Delicious Rank Building Technologies Office: Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project on Digg

273

Ecoefficient Faades for Office Buildings  

Science Journals Connector (OSTI)

This paper analyses the energy efficiency of a Ventilated Active FaadeVAFapplied to office buildings in Spain. The studied VAF...was developed in the Ventilated Active Faade project financed by the Spanish ...

O. Irulegi; A. Serra; R. Hernndez

2014-01-01T23:59:59.000Z

274

HEADQUARTERS SECURITY OFFICERS  

NLE Websites -- All DOE Office Websites (Extended Search)

HEADQUARTERS SECURITY OFFICERS Revision Date: December 16, 2013 ELEMENT Office of Security Operations AR AR-1 AR-1 AR-1 CF CF-40 CF-40 CI CI-3 ED ED-2 EE EE-3A EE-3A NAME LOCATION PHONE FAX NUMBER WAYNE E. BERKEBILE E-325/GTN 301-903-1163 301-903-8108 Advanced Research Projects Agency - Energy MATTHEW TARDUOGNO L'N !NT 950/Rm. 8014 202-586-2892 202-287-5450 NICHOLE CLAGETT (ALT) L'N !NT 950/Rm. 8025 202-287-6409 202-287-5450 SARA DWYER (REP) L'N !NT 950/Rm. B-2 202-287-6411 202-287-5450 Office of the Chief Financial Officer PHILIP A. KNOPP Rm. 1310 CLV. 301-903-0364 301-903-1863 KIMBERLY J. LUCAS (ALT) Rm. 1310 CLV. 301-903-2485 301-903-6877 Assistant Secretary for Congressional and Intergovernmental Affairs

275

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Depamnf!l1tal Elel1l~nt&$ite july 23, 2009 Office of Information Resources Office of Management DOE Headquarters, Germantown, Germantown Computer Center Server Room Nameonl1fol'l11i1tion Sysleijlprl'f 'Project FOIAXpress ExhibitProj~tUID TBD NeWPIA ~ Update D Please indicate whether this is a new

276

Categorical Exclusion Determinations: Loan Guarantee Program Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee Program Office Loan Guarantee Program Office Categorical Exclusion Determinations: Loan Guarantee Program Office Categorical Exclusion Determinations issued by Loan Guarantee Program Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 6, 2011 CX-006488: Categorical Exclusion Determination Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering CX(s) Applied: B1.31, B5.1 Date: 09/06/2011 Location(s): Auburn Hills, Michigan Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office July 28, 2011 CX-006383: Categorical Exclusion Determination Project Eagle Direct Water Manufacturing Plants CX(s) Applied: B1.23, B1.31 Date: 07/28/2011 Location(s): Lexington, Massachusetts Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan

277

INVESTMENT MANAGEMENT OFFICE MANAGEMENT OFFICE  

E-Print Network (OSTI)

INVESTMENT MANAGEMENT OFFICE INVESTMENT MANAGEMENT OFFICE THE UNIVERSITY OF UTAH University of Utah | Investment Management Office Quarterly Summary The Endowment Pool had a positive first quarter (ending March gain from investments of $7.8 million. The Endowment Pool unit value of $100 has grown to $175 in 10

278

Program or Field Office:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Title and 1.0. No.: Project Title and 1.0. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at the George West, Texas, Calibration Model Facility. LM # 45 - 11. Location: George West, Texas Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing five dry borehole calibration pits and seven concrete calibration pads. These calibration models are located at the George West, Calibration Facility on property leased from a private landowner. The lease is generally renewed every five years with the next anticipated renewal in 2014. Routine maintenance actions may include site inspection, fence repair, painting of facility components, potential

279

Program or Field Office:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

u.s. Department of Energy u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management * Project Title and 1. 0 . No.: Reclamation Projects in Energy Fuels Resources Lease Tracts C-AM -19 and C-AM-20, Uranium Leasing Program Location : Western Montrose County, CO Proposed Action or Project Description : Employees or contractors of Energy Fuels Resources under the supervision of U.S. Department of Energy contractor staff would backfill subsided areas associated with the former Cliff Dweller Mine (portal), Worcester Mine (shaft), and King Solomon Mine (vent) on uranium lease tract C-AM -19. All three areas had been previously reclaimed and subsidence has resulted in a safety hazard . There are several small areas that have subsided to a depth of ten feet over the Cliff Dweller Mine portal. Adjacent mine-

280

Federal Technical Assistance Aims to Accelerate Tribal Energy Project Deployment, Spring 2013 (Newsletter), Office of Indian Energy (OIE), Indian Energy Beat  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GET TECHNICAL GET TECHNICAL ASSISTANCE Apply for the START Program online at www.energy.gov/indianenergy/resources/ start-program. The deadline is March 15, 2013. Apply anytime online to receive up to 40 hours of free renewable energy and energy efficiency technical assistance from the DOE Office of Indian Energy and Tribal Energy Program at www.energy.gov/indianenergy. INDIAN ENERGY BEAT INSIDE THIS ISSUE: MESSAGE FROM THE DIRECTOR . . . . . . . . . . . . . . 2 INDIAN COUNTRY ENERGY ROUNDUP . . . . . . . . . . 2 SHARING KNOWLEDGE . . . . . . . . . . . . . . . . . . . . . 2 WINNING THE FUTURE . . . . . . . . . . . . . . . . . . . . . . 3 BUILDING BRIDGES . . . . . . . . . . . . . . . . . . . . . . . 3 ON THE HORIZON . . . . . . . . . . . . . . . . . . . . . . . . . 3 OPENING DOORS . . . . . . . . . . . . . . . . . . . . . . . . . 4 LEADING THE CHARGE . . . . . . . . . . . . . . . . . . . . . 4 The U.S. Department of Energy (DOE) Office of Indian Energy Policy

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Vehicle Technologies Office: Vehicle Technologies Office Recognizes  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicle Technologies Vehicle Technologies Office Recognizes Outstanding Researchers to someone by E-mail Share Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Facebook Tweet about Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Twitter Bookmark Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Google Bookmark Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Delicious Rank Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on Digg Find More places to share Vehicle Technologies Office: Vehicle Technologies Office Recognizes Outstanding Researchers on AddThis.com...

282

SECRETARY'S OFFICE  

Science Journals Connector (OSTI)

SECRETARY'S OFFICE ... The October 4, 1957 launching of Sputnik instigated a scurried emphasis on science or accentuated the lack of it in the United States. ...

1961-03-06T23:59:59.000Z

283

SECRETARY'S OFFICE  

Science Journals Connector (OSTI)

SECRETARY'S OFFICE ... Contact with an inspiring elementary school science teacher or a challenging course in high school chemistry may have contributed to the change. ...

ROBERT L. SILVER

1962-04-02T23:59:59.000Z

284

Office Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Since they comprised 18 percent of commercial floorspace, this means that their total energy intensity was just slightly above average. Office buildings predominantly used...

285

Categorical Exclusion Determinations: Office of River Protection-Richland  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2011 March 1, 2011 CX-005367: Categorical Exclusion Determination Project T-222 Hazardous Materials Management Emergency Response (HAMMER) Training Facility Water Main Extension for Fire Protection CX(s) Applied: B1.3, B1.15 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office March 1, 2011 CX-005366: Categorical Exclusion Determination Herbicide Applications Along Gravel and Paved Roads on the Hanford Site CX(s) Applied: B1.3 Date: 03/01/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office January 31, 2011 CX-005190: Categorical Exclusion Determination Project L-691, 200 West Area Sanitary Sewage Lagoon CX(s) Applied: B1.26 Date: 01/31/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

286

Program or Field Office:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, Energy , Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Activities at the Casper, Wyoming, Calibration Model Facility Location : Casper, Wyoming Proposed Action or Project Description: * DOE proposes to conduct routine activities as needed at a facility containing five dry borehole calibration pits and seven concrete calibration pads. These calibration models are located at the Casper, Wyoming Calibration Facility on property leased from the Natrona County International Airport Authority. Renewal of the lease generally occurs every five years with the next anticipated renewal in 2015. Routine maintenance action s may include fence repair, painting of facility components, potential replacement of

287

Delegation of Approval Authority for Integrated Project Team...  

NLE Websites -- All DOE Office Websites (Extended Search)

Team Charter Documents for Office of Environmental Management Major System Projects by surash DelegationApprovalAuthorityIntegratedProjectTeamCharterDocuments-EMMajorSysProject-Sur...

288

Are We There Yet? - Mike Peek, Director, Project Management ...  

Energy Savers (EERE)

- Mike Peek, Director, Project Management (MA-63) More Documents & Publications Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt R1A Slide 1...

289

2014 Annual Planning Summary for the NNSA Los Alamos Field Office...  

Energy Savers (EERE)

4 Annual Planning Summary for the NNSA Los Alamos Field Office 2014 Annual Planning Summary for the NNSA Los Alamos Field Office The ongoing and projected Environmental Assessments...

290

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2, 2009 September 2, 2009 CX-000521: Categorical Exclusion Determination Cut and Cap #325 Steam Supply Header, 261-H Consolidated Incineration Facility CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 2, 2009 CX-000520: Categorical Exclusion Determination 690-N (Ford Building) Fire System Isolation and Sanitary Sewer Grouting CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 1, 2009 CX-000519: Categorical Exclusion Determination E-Area Box Remediation Project CX(s) Applied: B6.6 Date: 09/01/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

291

Categorical Exclusion Determinations: Idaho Operations Office | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 25, 2011 January 25, 2011 CX-005187: Categorical Exclusion Determination Hex Block Shipment Project CX(s) Applied: B3.6 Date: 01/25/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office January 5, 2011 CX-004926: Categorical Exclusion Determination Radioactive Waste Management Complex ? Analytical Laboratory Operations CX(s) Applied: B3.1 Date: 01/05/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office December 10, 2010 CX-004645: Categorical Exclusion Determination CPP-663 Heating, Ventilation and Air Conditioning Systems Upgrade CX(s) Applied: B2.1 Date: 12/10/2010 Location(s): Idaho Office(s): Idaho Operations Office November 16, 2010 CX-004561: Categorical Exclusion Determination Idaho Nuclear Technology and Engineering Center - Light Water Breeder

292

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 23, 2010 February 23, 2010 CX-001128: Categorical Exclusion Determination Closure of 607-10G Septic Tank (Served 661-G) CX(s) Applied: B1.27 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-001127: Categorical Exclusion Determination Ballistic Resistant Enclosure Hatch Counterbalance CX(s) Applied: B2.5 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-000878: Categorical Exclusion Determination 293-F Stack Risk Reduction Project CX(s) Applied: B1.28 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010

293

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2010 March 10, 2010 CX-001373: Categorical Exclusion Determination Analytical Development Tritium Support Laboratory for Mass Spectroscopy, Infrared Spectroscopy, and Raman CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 10, 2010 CX-001372: Categorical Exclusion Determination On-Dock Rail Straddle Portal Prototype Project, Y580 CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

294

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2010 July 20, 2010 CX-003668: Categorical Exclusion Determination Subsurface Soils Exploration for Potential Pit Disassembly and Conversion Project Sandfilter Footprint CX(s) Applied: B3.1 Date: 07/20/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-003670: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-002984: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 25, 2010 CX-003671: Categorical Exclusion Determination

295

Program or Field Office:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management U.S. Department of Energy Categorical Exclusion Determination Form Office of Legacy Management Routine maintenance actions at the calibration pads and borehole pits near Grants, New Mexico. LM # 39-11. Location: Grants, New Mexico Proposed Action or Project Description : DOE proposes to conduct routine maintenance actions as needed, on a facility containing surface calibration pads and borehole pits. The facility is located on 1 acre northwest of Grants, New Mexico. The site is adjacent to New Mexico State Highway 605 and is surrounded by land administered by the U. S. Bureau of Land Management. Examples of typical maintenance actions that may occur include painting signs or identification numbers, fixing or repairing locks and the perimeter fence, hand-trimming vegetation that may encroach on the pad

296

Categorical Exclusion Determinations: Y-12 Site Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 Site Office Y-12 Site Office Categorical Exclusion Determinations: Y-12 Site Office Categorical Exclusion Determinations issued by Y-12 Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD February 7, 2013 CX-009251: Categorical Exclusion Determination High Contamination Area Cleanup Project (4596) CX(s) Applied: B1.3 Date: 06/25/2012 Location(s): Tennessee Offices(s): Y-12 Site Office September 5, 2012 CX-009250: Categorical Exclusion Determination Lithium Wet Chemistry Project (4597) CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): Tennessee Offices(s): Y-12 Site Office August 22, 2012 CX-009249: Categorical Exclusion Determination Security Upgrade Project (4598) CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office June 4, 2012 CX-008801: Categorical Exclusion Determination

297

Categorical Exclusion (CX) Determinations By Office | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Office Office Categorical Exclusion (CX) Determinations By Office Secretarial Offices Advanced Research Projects Agency-Energy Advanced Technology Vehicles Manufacturing Loan Program Civilian Radioactive Waste Management Office of Electricity Delivery and Energy Reliability Office of Energy Efficiency and Renewable Energy Environmental Management Fossil Energy Natural Gas Regulation Health, Safety, and Security Intelligence and Counterintelligence Legacy Management Loan Programs Office Nuclear Energy Science Power Administrations Bonneville Power Administration Southeastern Power Administration Southwestern Power Administration Western Area Power Administration --Western Area Power Administration-Colorado River Storage Project Management Center --Western Area Power Administration-Desert Southwest Region

298

Categorical Exclusion Determinations: Y-12 Site Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 Site Office Y-12 Site Office Categorical Exclusion Determinations: Y-12 Site Office Categorical Exclusion Determinations issued by Y-12 Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD January 28, 2010 CX-000834: Categorical Exclusion Determination Evaluation Project (4492) CX(s) Applied: B1.3, B2.5 Date: 01/28/2010 Location(s): Oak Ridge, Tennessee Office(s): Y-12 Site Office January 5, 2010 CX-000558: Categorical Exclusion Determination Building 9204-2E Vacuum System Upgrade (4489) CX(s) Applied: B1.3, B2.2 Date: 01/05/2010 Location(s): Oak Ridge, Tennessee Office(s): Y-12 Site Office January 5, 2010 CX-000559: Categorical Exclusion Determination Chiller Booster Pumps (4487) CX(s) Applied: B1.3, B2.2 Date: 01/05/2010 Location(s): Oak Ridge, Tennessee Office(s): Y-12 Site Office

299

Sustainability Performance Office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office...

300

Office of Science | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Office of Science Office of Science Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov Processes and Procedures Office of Science Print Text Size: A A A RSS Feeds FeedbackShare Page SC Project Management Overview SC Project Decision Matrix .pdf file (86KB), March 2013 Memorandum from W.F. Brinkman: SC is Exempt from DOE Order 413.3B .pdf file

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I m ~ a c t Assessment (PIA) Name of Project: SEC-2 Bureau: US Department of Energy (DOE) Project Unique ID: DOE-ID Security clearance work tracking and budget system. Date: April 4,2008 A. CONTACT INFORMATION 1. Who is the person completing this document? Name: Jeffrey R. Lascheid Title: Program Manager Organization: Westech International, Inc. Address: 1955 N. Fremont Ave, MS 1170 Idaho Falls, ID 8341 5 2. Who is the system owner? Name: M. Christine Ott, Chief Information Officer US DOE, Idaho Operations Office DOE-ID Security and Emergency Management Division Address: 1955 N Fremont Ave, MS 1 170 Idaho Falls ID 83415 3. Who is the system manager for this system or application? Name: Robert L. Green, Director Security and Emergency Management Division

302

Building Technologies Office: 2013 DOE Building Technologies Office Program  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 DOE Building Technologies Office Program Review 2013 DOE Building Technologies Office Program Review The 2013 Department of Energy (DOE) Building Technologies Office Program Review was held April 2-4, 2013 in Washington, DC. This inaugural review encompassed active work done by the Building Technologies Office (BTO), with a total of 59 individual activities reviewed. Sixty independent experts assessed the progress and contributions of each project toward BTO's mission and goals, and these assessments will be used to enhance the management of existing efforts, gauge the effectiveness of projects, and design future programs. The meeting also provided an opportunity to promote collaborations, partnerships, and technology transfers. 2013 Program Peer Review Report | 2013 Program Peer Review Presentations

303

Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel  

NLE Websites -- All DOE Office Websites (Extended Search)

Market Transformation Market Transformation Printable Version Share this resource Send a link to Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel Cell Projects to someone by E-mail Share Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel Cell Projects on Facebook Tweet about Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel Cell Projects on Twitter Bookmark Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel Cell Projects on Google Bookmark Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel Cell Projects on Delicious Rank Fuel Cell Technologies Office: Financial Incentives for Hydrogen and Fuel Cell Projects on Digg Find More places to share Fuel Cell Technologies Office: Financial

304

Cost Transfers Involving Sponsored Projects Directives and Procedures  

E-Print Network (OSTI)

Cost Transfers Involving Sponsored Projects Directives and Procedures Responsible Office: Office....................................................................................................................2 1.3 Cost Transfer..................................................................................................................................................2 4. Documentation of Cost Transfers

Jawitz, James W.

305

Business Manangement System(BMS), RL-2008/Project Hanford Management...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Business Manangement System(BMS), RL-2008Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008...

306

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Energy.gov (U.S. Department of Energy (DOE))

This report covers the Wind and Water Power Technologies Offices Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014.

307

Golden Field Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80401 -3393 DOEIEA-1818 80401 -3393 DOEIEA-1818 FINDING OF NO SIGNIFICANT IMPACT PETTISVILLE WIND ENERGY PROJECT AGENCY: U.S . Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The U.S. Department of Energy (DOE) provided Federal funding to the Ohio Department of Development (0000) under the State Energy Program (SEP). 0000 proposes to provide $1 ,225 ,000 of its SEP funds to the Pettisvil Ie Local Schools (Pettisville) for the Pettisville Local Schools Wind Energy Project (Wind Energy Project). DOE' s Proposed Action is to authorize the expenditure of Federal funding under State Energy Program to design, permit, and construct the Pettisville Wind Energy Project, a 750-kilowatt wind turbine at the Pettisville Pre-Kindergarten through Twelfth Grade School located at

308

Independent Activity Report, Richland Operations Office - April 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Independent Activity Report, Richland Operations Office - April 2013 April 2013 Operational Awareness of a Department of Energy Richland Operations Office Fire Protection Surveillance [HIAR-RL-2013-04-08] The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an onsite operational awareness review of a DOE Richland Operations Office (DOE-RL) fire protection surveillance. Independent Activity Report, Richland Operations Office - April 2013 More Documents & Publications Independent Activity Report, Richland Operations Office - April 2011 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Richland Operations Office - June 201

309

Map Locating Berkeley Lab Washington, DC Office  

NLE Websites -- All DOE Office Websites (Extended Search)

WASHINGTON, DC PROJECTS OFFICE WASHINGTON, DC PROJECTS OFFICE Map LEGEND: A:Berkeley Lab DC Office; PNNL; NREL; ORNL | B: EPA Waterside Mall C: Metrorail Station: Smithsonian | D: Metrorail Station: L'Enfant Plaza Notice: Due to security requirements in the building, all visitors to the Berkeley Lab DC Projects Office must check in at the ground floor entrance. If you do not have a DOE access badge, you will need to obtain a building visitor badge. To expedite this process, visitors are encouraged to RSVP to their meeting host or call (202) 488-2250 ahead of time. Metal detectors and x-ray screening of personal items are required for all visitors and staff entering the building. Directions to the Lab's Washington, DC Projects Office 901 D Street, SW Suite 950 Washington, DC 20024 Phone/Fax: (202) 488-2250

310

Building Technologies Office: Low-Global Warming Potential Refrigerants  

NLE Websites -- All DOE Office Websites (Extended Search)

Low-Global Warming Low-Global Warming Potential Refrigerants Research Project to someone by E-mail Share Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Facebook Tweet about Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Twitter Bookmark Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Google Bookmark Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Delicious Rank Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on Digg Find More places to share Building Technologies Office: Low-Global Warming Potential Refrigerants Research Project on AddThis.com... About Take Action to Save Energy

311

Building Technologies Office: Air-Source Integrated Heat Pump Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Air-Source Integrated Air-Source Integrated Heat Pump Research Project to someone by E-mail Share Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Facebook Tweet about Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Twitter Bookmark Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Google Bookmark Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Delicious Rank Building Technologies Office: Air-Source Integrated Heat Pump Research Project on Digg Find More places to share Building Technologies Office: Air-Source Integrated Heat Pump Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research Building Envelope Research

312

Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger  

NLE Websites -- All DOE Office Websites (Extended Search)

Radial Air Bearing Radial Air Bearing Heat Exchanger Research Project to someone by E-mail Share Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Facebook Tweet about Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Twitter Bookmark Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Google Bookmark Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Delicious Rank Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on Digg Find More places to share Building Technologies Office: HVAC Radial Air Bearing Heat Exchanger Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

313

Building Technologies Office: Open-Standard Wireless Controllers for Water  

NLE Websites -- All DOE Office Websites (Extended Search)

Open-Standard Wireless Open-Standard Wireless Controllers for Water Heaters Research Project to someone by E-mail Share Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Facebook Tweet about Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Twitter Bookmark Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Google Bookmark Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Delicious Rank Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on Digg Find More places to share Building Technologies Office: Open-Standard Wireless Controllers for Water Heaters Research Project on

314

Building Technologies Office: Building-Level Energy Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Building-Level Energy Building-Level Energy Management Systems Research Project to someone by E-mail Share Building Technologies Office: Building-Level Energy Management Systems Research Project on Facebook Tweet about Building Technologies Office: Building-Level Energy Management Systems Research Project on Twitter Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Google Bookmark Building Technologies Office: Building-Level Energy Management Systems Research Project on Delicious Rank Building Technologies Office: Building-Level Energy Management Systems Research Project on Digg Find More places to share Building Technologies Office: Building-Level Energy Management Systems Research Project on AddThis.com... About Take Action to Save Energy

315

Building Technologies Office: HVAC and Water Heater Field Tests Research  

NLE Websites -- All DOE Office Websites (Extended Search)

HVAC and Water Heater HVAC and Water Heater Field Tests Research Project to someone by E-mail Share Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Facebook Tweet about Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Twitter Bookmark Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Google Bookmark Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Delicious Rank Building Technologies Office: HVAC and Water Heater Field Tests Research Project on Digg Find More places to share Building Technologies Office: HVAC and Water Heater Field Tests Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities Appliances Research

316

Building Technologies Office: Pollution Impact on Cool Roof Efficacy  

NLE Websites -- All DOE Office Websites (Extended Search)

Pollution Impact on Pollution Impact on Cool Roof Efficacy Research Project to someone by E-mail Share Building Technologies Office: Pollution Impact on Cool Roof Efficacy Research Project on Facebook Tweet about Building Technologies Office: Pollution Impact on Cool Roof Efficacy Research Project on Twitter Bookmark Building Technologies Office: Pollution Impact on Cool Roof Efficacy Research Project on Google Bookmark Building Technologies Office: Pollution Impact on Cool Roof Efficacy Research Project on Delicious Rank Building Technologies Office: Pollution Impact on Cool Roof Efficacy Research Project on Digg Find More places to share Building Technologies Office: Pollution Impact on Cool Roof Efficacy Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE

317

Building Technologies Office: Ground Source Heap Pump Data Mining Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Ground Source Heap Pump Ground Source Heap Pump Data Mining Research Project to someone by E-mail Share Building Technologies Office: Ground Source Heap Pump Data Mining Research Project on Facebook Tweet about Building Technologies Office: Ground Source Heap Pump Data Mining Research Project on Twitter Bookmark Building Technologies Office: Ground Source Heap Pump Data Mining Research Project on Google Bookmark Building Technologies Office: Ground Source Heap Pump Data Mining Research Project on Delicious Rank Building Technologies Office: Ground Source Heap Pump Data Mining Research Project on Digg Find More places to share Building Technologies Office: Ground Source Heap Pump Data Mining Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities

318

Building Technologies Office: National Institute for Standards and  

NLE Websites -- All DOE Office Websites (Extended Search)

National Institute for National Institute for Standards and Technology and Low-Global Warming Potential Refrigerants Research Project to someone by E-mail Share Building Technologies Office: National Institute for Standards and Technology and Low-Global Warming Potential Refrigerants Research Project on Facebook Tweet about Building Technologies Office: National Institute for Standards and Technology and Low-Global Warming Potential Refrigerants Research Project on Twitter Bookmark Building Technologies Office: National Institute for Standards and Technology and Low-Global Warming Potential Refrigerants Research Project on Google Bookmark Building Technologies Office: National Institute for Standards and Technology and Low-Global Warming Potential Refrigerants Research Project on Delicious

319

Independent Activity Report, Los Alamos Site Office - December 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Office - December 2010 Site Office - December 2010 Independent Activity Report, Los Alamos Site Office - December 2010 December 2010 Los Alamos Site Office, Office of Quality Assurance Assessment of the Chemistry and Metallurgy Research Building Replacement Project Quality Assurance Plan The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, in coordination with the Los Alamos Site Office (LASO), Office of Quality Assurance (OQA), reviewed the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, Quality Assurance Program Plan (QAPP). The objective of the review was to validate that the CMRR Project, QAPP meets American Society of Mechanical Engineers Standard (ASME), Nuclear Quality Assurance (NQA) Standard, ASME

320

Office of Chief Financial Officer  

Directives, Delegations, and Requirements

This Order implements the provisions of the Chief Financial Officers Act of 1990 within the Department of Energy. Cancels SEN 34-91. Canceled by DOE O 520.1A.

2001-01-19T23:59:59.000Z

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Department of Energy Names Director for Office of Indian Energy...  

Office of Environmental Management (EM)

Names Director for Office of Indian Energy Policy and Makes Available 2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian...

322

NETL: Computer Software & Databases - Simulators  

NLE Websites -- All DOE Office Websites (Extended Search)

Simulators Simulators DOE/BC-89/3/SP. Handbook for Personal Computer Version of BOAST II: A Three- Dimensional, Three-Phase Black Oil Applied Simulation Tool. Bartlesville Project Office. January 1989. 82 pp. NTIS Order No. DE89000725. FORTRAN source code and executable program. Min. Req.: IBM PC/AT, PS-2, or compatible computer with 640 Kbytes of memory. Download 464 KB Manual 75 KB Manual 404 KB Reference paper (1033-3,v1) by Fanchi, et al. Manual 83 KB Reference paper (1033-3,v2) by Fanchi, et al. BOAST 3: FORTRAN source code and executable program. User's Guide and Documentation Manual. Bartlesville Project Office, October 1996. BOAST 3 is a modified version of BOAST II containing Post Processors B3PLOT and COLORGRID. The executable was compiled with the 32-bit Microsoft PowerStation FORTRAN and is 100% Windows compatible. Min. Req.: 386/486 PC environment.

323

Projects Funded by the American Recovery and Reinvestment Act of 2009 and Administered by the Office of Energy Efficiency and Renewable Energy (EERE) Notice  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) National Environmental Policy Act (NEPA) guidelines for states and U.S. territories sponsoring energy efficiency and renewable energy projects funded by the 2009 Recovery Act and administered through the DOE State Energy Program (SEP).

324

Eleven Tribes Jump START Clean Energy Projects, Summer 2012 (Newsletter), U.S. Department of Energy (DOE) Office of Indian Energy (OIE), Indian Energy Beat  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BUILDING BUILDING BRIDGES . . . . . . . . . . . . . . . . . . . . . . . 3 SHARING KNOWLEDGE . . . . . . . . . . . . . . . . . . . . . 3 WINNING THE FUTURE . . . . . . . . . . . . . . . . . . . . . . 3 ON THE HORIZON . . . . . . . . . . . . . . . . . . . . . . . . . 4 LEADING THE CHARGE . . . . . . . . . . . . . . . . . . . . . 4 "Tribal communities, entrepreneurs, and small businesses will benefit greatly from the technical resources and expertise provided by DOE. START will help Native American and Alaska Native communities increase local generation capacity, enhance energy efficiency and conservation measures, and create job opportunities in the new clean energy economy." -DOE-IE Director Tracey A. LeBeau The U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) has selected 11 Tribes-five in Alaska and six in the contiguous United States-to receive on-the-ground technical support for community-based energy efficiency and renewable

325

Director's Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Office Director's Office Director's Office Print Roger Falcone Director, Advanced Light Source, Ernest Orlando Lawrence Berkeley National Laboratory and Professor of Physics, University of California, Berkeley. Roger Falcone Web page at the University of California, Berkeley Advanced Light Source Lawrence Berkeley National Laboratory 1 Cyclotron Road, MS 80R0114 Berkeley, CA 94720 USA Tel. (510) 486-6692 Fax (510) 486-4960 Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Roger Falcone, University of California, Berkeley physics professor and veteran ALS user, succeeded Janos Kirz as ALS Division Director on September 1, 2006. Dr. Falcone received his undergraduate degree in physics from Princeton University in 1974. He earned an M.S. and Ph.D. in

326

TORIS Data Preparation Guidelines  

SciTech Connect

The objective of this manual is to present guidelines and procedures for the preparation of new data for the Tertiary Oil Recovery Information System (TORIS) data base. TORIS is an analytical system currently maintained by the Department of Energy's (DOE) Bartlesville Project Office. It uses an extensive field- and reservoir-level data base to evaluate the technical and economic recovery potential of specific crude oil reservoirs.

Guinn, H.; Remson, D.

1999-03-11T23:59:59.000Z

327

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

328

Business Manangement System(BMS), RL-2008/Project Hanford Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

329

Building Technologies Office: Advanced, Variable Speed Air-Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced, Variable Advanced, Variable Speed Air-Source Integrated Heat Pumps Research Project to someone by E-mail Share Building Technologies Office: Advanced, Variable Speed Air-Source Integrated Heat Pumps Research Project on Facebook Tweet about Building Technologies Office: Advanced, Variable Speed Air-Source Integrated Heat Pumps Research Project on Twitter Bookmark Building Technologies Office: Advanced, Variable Speed Air-Source Integrated Heat Pumps Research Project on Google Bookmark Building Technologies Office: Advanced, Variable Speed Air-Source Integrated Heat Pumps Research Project on Delicious Rank Building Technologies Office: Advanced, Variable Speed Air-Source Integrated Heat Pumps Research Project on Digg Find More places to share Building Technologies Office: Advanced,

330

Building Technologies Office: Shape-Stable and Highly Conductive  

NLE Websites -- All DOE Office Websites (Extended Search)

Shape-Stable and Highly Shape-Stable and Highly Conductive Nano-Phase-Change Materials Research Project to someone by E-mail Share Building Technologies Office: Shape-Stable and Highly Conductive Nano-Phase-Change Materials Research Project on Facebook Tweet about Building Technologies Office: Shape-Stable and Highly Conductive Nano-Phase-Change Materials Research Project on Twitter Bookmark Building Technologies Office: Shape-Stable and Highly Conductive Nano-Phase-Change Materials Research Project on Google Bookmark Building Technologies Office: Shape-Stable and Highly Conductive Nano-Phase-Change Materials Research Project on Delicious Rank Building Technologies Office: Shape-Stable and Highly Conductive Nano-Phase-Change Materials Research Project on Digg Find More places to share Building Technologies Office: Shape-Stable

331

Building Technologies Office: Developing a Standard Method of Test for  

NLE Websites -- All DOE Office Websites (Extended Search)

Developing a Standard Developing a Standard Method of Test for Integrated Heat Pumps Research Project to someone by E-mail Share Building Technologies Office: Developing a Standard Method of Test for Integrated Heat Pumps Research Project on Facebook Tweet about Building Technologies Office: Developing a Standard Method of Test for Integrated Heat Pumps Research Project on Twitter Bookmark Building Technologies Office: Developing a Standard Method of Test for Integrated Heat Pumps Research Project on Google Bookmark Building Technologies Office: Developing a Standard Method of Test for Integrated Heat Pumps Research Project on Delicious Rank Building Technologies Office: Developing a Standard Method of Test for Integrated Heat Pumps Research Project on Digg Find More places to share Building Technologies Office: Developing a

332

EM Current Project Performance  

Energy.gov (U.S. Department of Energy (DOE))

In the spirit of promoting transparency with stakeholders and the public, the Office of EnvironmentalManagement (EM) posts key project management information on its website. This document provides...

333

START Program Project Sites  

Energy.gov (U.S. Department of Energy (DOE))

The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through START,...

334

Pacific Northwest Laboratory annual report for 1985 to the DOE Office of the Assistant Secretary for Environment, Safety and Health. Part 5. Overview and assessment  

SciTech Connect

This volume is progress on work performed for the Office of Nuclear Safety, the Office of Operational Safety, and for the Office of Environmental Analysis for each project. Separate abstracts have been prepared for individual projects. ACR

Faust, L.G.

1986-02-01T23:59:59.000Z

335

DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. The DOE Office of Environmental Management (EM) has put in place a "Roadmap" for Journey to Excellence that sets specific performance expectations for continuous improvements in contract and project management. Following are some highlights of EM's improvement actions over the past five years. In 2006, the National Academy of Public Administration (NAPA) began a study of EM, which included acquisition and project management among its key focus areas. The resultant report from the study,

336

Technology Areas and Offices  

Office of Energy Efficiency and Renewable Energy (EERE)

The Office of Energy Efficiency and Renewable Energy (EERE) consists of several offices that support EERE's mission. This page lists all of the major offices and their websites.

337

Microsoft Office Outlook - Memo Style  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Robert R. Martin [ibis@pipeline.com] Robert R. Martin [ibis@pipeline.com] Sent: Monday, August 26, 2013 4:13 AM To: Lawrence, Christopher Cc: maryanne.sullivan@hoganlovells.com; Bartoab@nu.com Subject: Renewal of Request for Northern Pass Project Intervenor Status Importance: High Mr. Christopher Lawrence, In December 2010, I filed with your office for Intervener status on the Northern Pass project then under consideration. Notwithstanding that fact, there have been a number of gyrations, changes, and false starts on this project since then, so that I am concerned that my status as an Intervener might be in question as this project moves back into the permit consideration and approval cycle. Therefore, I wish to reestablish and/or validate my request to be included in your office's list of Interveners, should that not already be the case.

338

Program or Field Office:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Location: Location: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine site activities at the Shirley Basin South, Wyoming, Disposal Site. LM # 40 - 11. South of Casper, Wyoming Proposed Action or Project Description: Routine site activities include collection of water samples from groundwater monitoring wells, use of herbicides to spray invasive weeds, and mapping weeds on the site in alternate years to evaluate effectiveness of weed control efforts. In addition, a grazing licensee who runs 100 head of cattle on the site (approximately one month per year) proposes to install a gravity-fed water supply source. Potable water would be obtained, in accordance with license stipulations, from

339

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Form EIA-457AlG Residential Energy Consumption Survey Form EIA-457AlG Residential Energy Consumption Survey Bureau: U.S. Department of EnergyIEnergy Information Administration Project Unique ID: Date: May 30,2008 A. CONTACT INFORMATION 1. Who is the person completing this document? Jacob Bournazian Statistics & Methods Group Energy Information Administration Ernail: Jacob.bournazian@,eia.doe.~?;ov Phone number: (202) 586-5562 2. Who is the system owner? Stephanie Battles Director, Energy Consumption Division, Office of Energy Markets and End Use Energy Information Administration Email: Stephanie.battles@eia.doe.gov Phone number: (202) 586-7237 3. Who is the system manager for this system o r application? Eileen O'Brien Consumption Data Management Team, Energy Consumption Division, Office of Energy Markets and End Use

340

Code Compliance Technical Meeting: Building Technologies Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Compliance Technical Meeting: Building Technologies Office Department of Energy Washington, DC APRIL 2013 1 Welcome Welcome to The Building Technologies Office's Code Compliance Technical Meeting and to Washington, DC. On behalf of the Department of Energy Building Technology Office (BTO), we would like to thank you for attending, for your participation. The goal of this meeting is to review and discuss ongoing projects and existing activities that improve compliance with model energy codes. DOE

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2013 Annual Planning Summary for the Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within theCarlsbad Field Office.

342

Independent Activity Report, Richland Operations Office - June 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, Richland Operations Office - June 2011 Independent Activity Report, Richland Operations Office - June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed operational awareness reviews of the Sludge Treatment Project (STP), Engineered Container Retrieval and Transfer System (ECRTS) during site visits. Independent Activity Report, Richland Operations Office - June 2011 More Documents & Publications Independent Activity Report, Richland Operations Office - April 2011 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Richland Operations Office - August 2011

343

DOE Hydrogen Analysis Repository: Policy Office Electricity Modeling System  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy Office Electricity Modeling System (POEMS) Policy Office Electricity Modeling System (POEMS) Project Summary Full Title: Policy Office Electricity Modeling System (POEMS) Project ID: 93 Principal Investigator: Lessly Goudarzi Purpose Designed and built by OnLocation specifically to address electricity industry restructuring issues Performer Principal Investigator: Lessly Goudarzi Organization: OnLocation, Inc. Address: Suite 300, 501 Church Street Vienna, VA 22180 Telephone: 703-938-5151 Email: goudarzi@onlocationinc.com Project Description Type of Project: Model Category: Energy Infrastructure Products/Deliverables Description: National Transmission Grid Study - Appendix A Publication Title: Policy Office Electricty Modeling System (POEMS) and Documentation for Transmission Analysis (PDF 461 KB) Download Adobe Reader.

344

Construction Review | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Assessment (SC-1.3) within the Office of Science (SC) conducts independent technical, cost, schedule, and management peer reviews of SC construction projects and large...

345

2012 Annual Planning Summary for Nevada Site Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APS-2012-NSO.xls More Documents & Publications 2014 Annual Planning Summary for the West Valley Demonstration Project 2012 Annual Planning Summary for Loan Program Office 2012...

346

Customized Resources for Others | OSTI, US Dept of Energy, Office...  

Office of Scientific and Technical Information (OSTI)

projects, including the former Environmental Management Science Program (EMSP) and the Natural and Accelerated Bioremediation Research (NABIR) programs. Office of Biological and...

347

Jobs | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

OSO Home About Jobs Oak Ridge National Laboratory Site Office (OSO) OSO Home About Organization Chart .pdf file (317KB) Jobs Current Projects Contract Management Environment,...

348

Contract Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Contract Management Oak Ridge National Laboratory Site Office (OSO) OSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information...

349

2011 Annual Planning Summary for Idaho Operations Office (ID)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Idaho Operations Office (ID) (See Environmental Management).

350

2011 Annual Planning Summary for Chicago Operations Office (CH)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Chicago Operations Office (CH) (See Science APS).

351

2015 Peer Review Agenda for the Geothermal Technologies Office  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Department's Geothermal Technologies Office hosts its 2015 Peer Review on May 11-14, 2015, with a rigorous review of the technical project portfolio.

352

Subscribe to Weatherization and Intergovernmental Program Office Newsletters  

Energy.gov (U.S. Department of Energy (DOE))

Get email subscriptions to the Weatherization and Intergovernmental Program Office Newsletters, Guidelines for Home Energy Professionals Project Updates and State and Local Technical Assistance Program Alerts.

353

2011 Annual Planning Summary for Savannah River Operations Office (SRS)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Savannah River Operations Office (SRS) (See also Environmental Management).

354

DOE - Office of Legacy Management -- Canonsburg Industrial Park...  

Office of Legacy Management (LM)

Package-October 2008 Groundwater and Surface Water Sampling FACT SHEET Office of Legacy Management Canonsburg, Pennsylvania, Disposal Site Project Plan: Ground Water...

355

2011 Annual Planning Summary for Fermi Site Office (FSO)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Fermi Site Office (See Science APS).

356

Industrial User Office | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial Liaison Office Industrial Liaison Office Industrial Liaison Office registration page New to Synchrotron Radiation New to the APS Already a User Advanced Photon Source Industrial Liaison Office Welcome to the Advanced Photon Source (APS) Industrial Liaison Office home page. The purpose of this Office is to provide outreach from the APS to the industrial community. As we develop the Office and this website to better address the needs of industrial users of the APS, both current and prospective, we are soliciting input by requesting projects and measurements that you would like to perform at the APS. Please complete the form below so that we can begin communicating with you. Questions? Email aps-i@aps.anl.gov. General Information Company Name *required First Name *required Last Name *required

357

DOE Project: Optimization of Advanced Diesel Engine Combustion Strategies "University Research in Advanced Combustion and Emissions Control" Office of FreedomCAR and Vehicle Technologies Program  

SciTech Connect

The goal of the present technology development was to increase the efficiency of internal combustion engines while minimizing the energy penalty of meeting emissions regulations. This objective was achieved through experimentation and the development of advanced combustion regimes and emission control strategies, coupled with advanced petroleum and non-petroleum fuel formulations. To meet the goals of the project, it was necessary to improve the efficiency of expansion work extraction, and this required optimized combustion phasing and minimized in-cylinder heat transfer losses. To minimize fuel used for diesel particulate filter (DPF) regeneration, soot emissions were also minimized. Because of the complex nature of optimizing production engines for real-world variations in fuels, temperatures and pressures, the project applied high-fidelity computing and high-resolution engine experiments synergistically to create and apply advanced tools (i.e., fast, accurate predictive models) developed for low-emission, fuel-efficient engine designs. The companion experiments were conducted using representative single- and multi-cylinder automotive and truck diesel engines.

Reitz, Rolf; Foster, D.; Ghandhi, J.; Rothamer, D.; Rutland, C.; Sanders, S.; Trujillo, M.

2012-10-26T23:59:59.000Z

358

Office of Facilities Management Macquarie University  

E-Print Network (OSTI)

Office of Facilities Management ­ Macquarie University: Air Conditioning General Policy No Division, Department, Office or other occupant of University facilities will act in respect of air-conditioning systems of units by or through external sources. Air-conditioning requirements for all capital works projects

Wang, Yan

359

Chief Financial Officer, Oak Ridge Office  

Energy.gov (U.S. Department of Energy (DOE))

A successful candidate in this position will serve as the Chief Financial Officer, Oak Ridge Office, providing overall executive leadership for financial management, budgeting, contractor...

360

Caltrans Relights its Marysville Office  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 The Cutting Edge: Caltrans Relights its Marysville Office RADIANCE simulations of Caltrans Marysville office before (above) and after retrofit (below). Note the change in lighting of the walls and elimination of glare from protruding ceiling fixtures. Researchers in the Building Technologies Program are assessing a lighting retrofit project at the Marysville District Headquarters of the California Department of Transportation. Also known as Caltrans, the agency has recently completed an installation of deep-cell parabolic luminaires in an open office area that houses design and drafting services for road construction and maintenance in its District 3 headquarters in Marysville. The agency plans to develop specifications for upgrading lighting systems in other offices based on results from

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Office of Chief Financial Officer  

Directives, Delegations, and Requirements

Page Change 1 to DOE O 520.1 modifies the responsibility statement to include NNSA Field CFO positions, modifies Heads of Field Elements responsibilities for consistency with the CFO responsibilities, and makes a minor change to reflect the establishment of the Office of Management, Budget and Evaluation. Cancels SEN 34-9.

2001-11-27T23:59:59.000Z

362

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 18, 2010 October 18, 2010 CX-004290: Categorical Exclusion Determination Greenfield Community College - Geothermal Project CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004288: Categorical Exclusion Determination Carbon Motors Corporation CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Connersville, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004284: Categorical Exclusion Determination Recovery Act: Conducting a 3-Dimensional Converted Shear Wave Project CX(s) Applied: A9, B3.1, B3.7 Date: 10/18/2010 Location(s): Imperial County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

363

Microsoft Word - Carlsbad ARRA Office Release-Final-1 _2_  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE CARLSBAD FIELD OFFICE OPENS DOE CARLSBAD FIELD OFFICE OPENS LOCAL RECOVERY ACT OFFICE CARLSBAD, N.M., June 25, 2009 - The U.S. Department of Energy announced today that DOE's Carlsbad Field Office (CBFO) recently opened a local office to support the CBFO Recovery Act Project. The office - located at 315 N. Canal - will be staffed by CBFO and contractor personnel dedicated to managing CBFO Recovery Act Project activities. In order to meet the Recovery Act's commitment to transparency and accountability, the office staff will also track and report funding and spending by the Carlsbad office and Waste Isolation Pilot Plant (WIPP). Under the American Recovery and Reinvestment Act, the Carlsbad Field Office and WIPP - located outside Carlsbad - received $172 million to support cleanup activities

364

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-000919: Categorical Exclusion Determination Packwood Lake Hydroelectric Project CX(s) Applied: B5.1 Date: 02/25/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 25, 2010 CX-000917: Categorical Exclusion Determination Ocean Thermal Energy Converter Life Cycle Cost Analysis Date: 02/25/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 25, 2010 CX-000916: Categorical Exclusion Determination Ocean Thermal Extractable Energy Visualization CX(s) Applied: A9 Date: 02/25/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 25, 2010 CX-000862: Categorical Exclusion Determination Mount Laurel Energy Audit Implementation Project

365

Project Management Quality Assurance Guide, GPG 017  

Energy.gov (U.S. Department of Energy (DOE))

LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-017 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management

366

Draft Advanced Fossil Energy Projects Solicitation Public Comments  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy Loan Programs Office: Draft Advanced Fossil Energy Projects Solicitation Public Comments

367

2013 Awards for Project Management | Department of Energy  

Energy Savers (EERE)

(National Nuclear Security Administration) Secretary's Award of Excellence: Chemistry & Metallurgy Research Building Replacement ProjectRadiological Lab Utility Office...

368

Review of the Hanford Waste Treatment and Immobilization Project Black-Cell and Hard-to-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review of the Independent Oversight Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................... 1 2.0 Scope...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 2

369

Review of the Hanford Waste Treatment and Immobilization Project Black-Cell and Hard-to-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Oversight Review of the Independent Oversight Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U. S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................... 1 2.0 Scope...................................................................................................................................................... 1 3.0 Background ............................................................................................................................................ 2

370

Tribal Renewable Energy Advanced Course: Commercial Scale Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Scale Project Development Tribal Renewable Energy Advanced Course: Commercial Scale Project Development Watch the DOE Office of Indian Energy advanced course...

371

High Energy Materials for PHEVs: Cathodes (New Project) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Materials for PHEVs: Cathodes (New Project) High Energy Materials for PHEVs: Cathodes (New Project) Presentation from the U.S. DOE Office of Vehicle Technologies "Mega"...

372

Independent Activity Report, Hanford Sludge Treatment Project - February  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sludge Treatment Project - Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational Awareness Review [HIAR-RL-2012-02-27] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed operational awareness reviews of the Sludge Treatment Project (STP), Engineered Container Retrieval and Transfer System (ECRTS) during site visits. Independent Activity Report, Hanford Sludge Treatment Project - February 2012 More Documents & Publications Independent Activity Report, Richland Operations Office - June 2011 Independent Activity Report, Richland Operations Office - April 2011 Independent Activity Report, Richland Operations Office - August 2011

373

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

374

Categorical Exclusion Determinations: Nevada Site Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada Site Office Nevada Site Office Categorical Exclusion Determinations: Nevada Site Office Categorical Exclusion Determinations issued by Nevada Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD August 2, 2011 CX-006415: Categorical Exclusion Determination Lawrence Government Energy Efficiency Retrofit Project CX(s) Applied: B1.4, B2.2, B2.5, B5.1 Date: 08/02/2011 Location(s): Lawrence, Indiana Office(s): Energy Efficiency and Renewable Energy, Nevada Site Office July 5, 2011 CX-006351: Categorical Exclusion Determination Retrofit Heating, Ventilation and Air Conditioning and Control Systems in Parks and Recreation Facilities CX(s) Applied: B1.4, B2.1, B2.5, B5.1 Date: 07/05/2011 Location(s): Stillwater, Oklahoma Office(s): Energy Efficiency and Renewable Energy, Nevada Site Office

375

GO MANAGERS OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/2007 15:50 33275497 2/2007 15:50 33275497 GO MANAGERS OFFICE PAGE 02/06 STATEMENT OF CONSIDERATIONS REQUEST BY POET PROJECT LIBERTY, LLC (POET) FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN PATENT RIGHTS UNDER DOE GRANT NO. DE-FC36- 07GO17026; W(A)-07-038 The Petitioner, POET, has requested a waiver of domestic and foreign patent rights for all subject inventions arising from its participation under the above referenced cooperative agreement entitled "Launch of an Integrated Bio-Refinery with Eco-Sustainable and Renewable Technologies in Y2009." Novozymes is a subawardee on this project, and will file a petition for a waiver separately. The cooperative agreement that is the subject of this waiver covers preliminary engineering, permitting, and associated work in connection with DOE's commercial scale

376

Golden Field Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT MONARCH WARREN COUNTY WIND TURBINE PROJECT LENOX TOWNSIDP, WARREN COUNTY, IL AGENCY: U.S. Department of Energy (DOE), Golden Field Office ACTION: Finding orNo Significant Impact (FONS!) DOEIEA-JSOO SUMMARY: The U.S. Department of Energy (DOE) provided Federal funding appropriated under the American Reinvestment and Recovery Act 0(2009 to the Illinois Department ofComrnerce and Econom ic Opportunity (DeEO) under the State Energy Program (SEP). DeEO proposes to provide approximately $5 million of its SEP funds to Monarch Wind Power (MWP) for the Monarch Warren County Wind Turbine Project (MWTP). DOE's Proposed Action is to authorize the expenditure of Federal funding under State Energy Program to design, permit, and construct

377

Large Scale Geothermal Exchange System for Residential, Office and Retail  

Open Energy Info (EERE)

Geothermal Exchange System for Residential, Office and Retail Geothermal Exchange System for Residential, Office and Retail Development Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Large Scale Geothermal Exchange System for Residential, Office and Retail Development Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 1: Technology Demonstration Projects Project Description RiverHeath will be a new neighborhood, with residences, shops, restaurants, and offices. The design incorporates walking trails, community gardens, green roofs, and innovative stormwater controls. A major component of the project is our reliance on renewable energy. One legacy of the land's industrial past is an onsite hydro-electric facility which formerly powered the paper factories. The onsite hydro is being refurbished and will furnish 100% of the project's electricity demand.

378

Office of Nuclear Physics Jehanne Simon-Gillo  

E-Print Network (OSTI)

Office of Nuclear Physics Jehanne Simon-Gillo Acquisition Executive (Acting) Office of Nuclear Physics Jehanne Simon-Gillo Program Manager BNL Site Office Nand Narain Federal Project Director NASA A. McNerney Physics Support D. Raparia E. Beebe A. Kponou M. Okamura A. Pikin #12;

379

Office Buildings - Types of Office Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

PDF Office Buildings PDF Office Buildings Types of Office Buildings | Energy Consumption | End-Use Equipment Although no one building type dominates the commercial buildings sector, office buildings are the most common and account for more than 800,000 buildings or 17 percent of total commercial buildings. Offices comprised more than 12 billion square feet of floorspace, 17 percent of total commercial floorspace, the most of any building type. Types of Office Buildings The 2003 CBECS Detailed Tables present data for office buildings along with other principal building activities (see Detailed Tables B13 and B14, for example). Since office buildings comprise a wide range of office-related activities, survey respondents were presented with a follow-up list of specific office types to choose from. Although we have not presented the

380

Office | Open Energy Information  

Open Energy Info (EERE)

Building Type Office Building Type Office Definition Buildings used for general office space, professional office, or administrative offices. Medical offices are included here if they do not use any type of diagnostic medical equipment (if they do, they are categorized as an outpatient health care building). Sub Categories administrative or professional office; government office; mixed-use office; bank or other financial institution; medical office; sales office; contractor's office (e.g. construction, plumbing, HVAC); non-profit or social services; research and development; city hall or city center; religious office; call center References EIA CBECS Building Types [1] References ↑ EIA CBECS Building Types U.S. Energy Information Administration (Oct 2008) Retrieved from "http://en.openei.org/w/index.php?title=Office&oldid=270116

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Organization Examples Organization Examples Example 8 4.0 PROJECT ORGANIZATION Chapter 4.0 describes the principle project organizations, including their responsibilities and relationships. Other organizations, that have an interest in the project, also are described. 4.1 Principal Project Organizations and Responsibilities The management organization for the 324/327 Buildings Stabilization/Deactivation Project represents a partnership between four principal project organizations responsible for the project. The four project organizations and their associated summary responsibilities are described in the following paragraphs. 4.1.1 U.S. Department of Energy, Headquarters (HQ) The DOE-HQ Office of Nuclear Material and Facility Stabilization (EM-60) is primarily responsible for policy and budget decisions

382

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

797: Categorical Exclusion Determination 797: Categorical Exclusion Determination Chicago Area Alternative Fuels Deployment Project CX(s) Applied: A1, A7, A11, B5.1 Date: 04/20/2010 Location(s): Chicago, Illinois Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 20, 2010 CX-002047: Categorical Exclusion Determination Irma Charing Cross Sidewalk Project American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Irmo, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001899: Categorical Exclusion Determination XLD Reject Reclamation CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

383

Annual Planning Summaries: Nevada Site Office (NSO) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Planning Summaries: Nevada Site Office (NSO) Annual Planning Summaries: Nevada Site Office (NSO) Annual Planning Summaries: Nevada Site Office (NSO) January 31, 2012 2012 Annual Planning Summary for Nevada Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Nevada Site Office. January 20, 2011 2011 Annual Planning Summary for Nevada Site Office (NSO) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Nevada Site Office (NSO). January 14, 2010 2010 Annual Planning Summary for Nevada Site Office Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the

384

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-001399: Categorical Exclusion Determination Miles City Energy Efficiency Projects CX(s) Applied: A9, A11, B5.1 Date: 04/03/2010 Location(s): Miles City, Montana Office(s): Energy Efficiency and Renewable Energy April 3, 2010 CX-001397: Categorical Exclusion Determination Twin Falls Energy Efficiency Projects CX(s) Applied: A9, A11, B5.1 Date: 04/03/2010 Location(s): Twin Falls, Idaho Office(s): Energy Efficiency and Renewable Energy April 3, 2010 CX-001396: Categorical Exclusion Determination Twin Fall County Energy Efficiency Projects CX(s) Applied: A9, A11, B5.1 Date: 04/03/2010 Location(s): County of Twin Falls, Idaho Office(s): Energy Efficiency and Renewable Energy April 2, 2010 CX-001402: Categorical Exclusion Determination Pennsauken Energy Efficiency Projects

385

Golden Field Office | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Golden Field Office Golden Field Office Golden Field Office The Golden Field Office was designated a Department of Energy field office in December 1992 to provide EERE with enhanced capability to develop and commercialize renewable energy and energy-efficient technologies. What We Do Golden's mission is to support DOE's Office of Energy Efficiency and Renewable Energy (EERE) as its Business Service Center by awarding grants and contracts for clean energy projects, facilitating research and development (R&D) partnerships to support those technologies, and overseeing the National Renewable Energy Laboratory (NREL), the only national lab solely dedicated to researching and developing renewable energy and energy efficiency technologies. Federal and contractor staff award and manage grants. Staff members also

386

T-557: Microsoft Office Excel Office Art Object Parsing Remote...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Microsoft Office Excel Office Art Object Parsing Remote Code Execution Vulnerability T-557: Microsoft Office Excel Office Art Object Parsing Remote Code Execution Vulnerability...

387

Office of Personnel Management (OPM) Billing System PIA, Office...  

Office of Environmental Management (EM)

Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and...

388

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

389

Oak Ridge National Laboratory Site Office Homepage | U.S. DOE Office of  

Office of Science (SC) Website

Home Home Oak Ridge National Laboratory Site Office (OSO) OSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 Oak Ridge National Laboratory Site Office Pictured Right: Oak Ridge National Laboratory Site Office Staff OSO Staff Photo 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Oak Ridge National Laboratory Site Office (OSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Oak Ridge National Laboratory (ORNL) and the Oak Ridge Institute for Science and Education (ORISE) in Oak Ridge, Tennessee.

390

Thomas Jefferson Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Thomas Jefferson Site Office (TJSO) TJSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 Thomas Jefferson Site Office Pictured Right: Thomas Jefferson Site Office Staff TJSO Staff Photo 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Thomas Jefferson Site Office (TJSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Thomas Jefferson National Accelerator Facility (TJNAF) in Newport News, Virginia. TJNAF is one of ten Office of Science Laboratories and is a single program

391

Pacific Northwest Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Pacific Northwest Site Office (PNSO) PNSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 Pacific Northwest Site Office Pictured Right: Pacific Northwest Site Office Staff PNSO Staff Photo 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Pacific Northwest Site Office (PNSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Pacific Northwest National Laboratory (PNNL) External link in Richland, Washington. PNNL is one of ten Office of Science Laboratories and is a multi-program

392

Program Management for Contracting Officers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Government Contracting - Government Contracting - A Project Manager's Perspective ???!!! Presented by John Baniszewski, Deputy Project Manager and Former Procurement Manager, NASA Goddard Space Flight Center 2 Project Managers and Contracting Officers: The Need to Understand Each Other * "I can't understand it. I can't even understand the people who can understand it" - Queen Juliana of the Netherlands * "Seek first to understand, and then to be understood" - Stephen Covey * "If one does not understand a person, one tends to regard him as a fool" - Carl Jung * "Before you contradict an old man, my fair friend, you should endeavor to understand him" - George Santayana 3 Project Managers and Procurement * "A Guide to the Project Management Body of

393

Project Safety Oversight Activities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Activities For all DOE-funded projects, the Fuel Cell Technologies Office implements procedures and practices to ensure safety in the operation, handling, and use of hydrogen...

394

2014 DOE Project Management Workshop Presentations | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1. PM Update - Paul Bosco, Director, Office of Acquisition & Project Management 2. Ethics - Marianne Jennings, W.P. Carey School of Business at Arizona State University 3....

395

EV Project: Solar-Assisted Charging Demo  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Melissa Lapsa 2014 DOE Vehicle Technologies Office Review Presentation EV Project - Solar- Assisted Charging Demo VSS138 2014 U.S. DOE Hydrogen Program and Vehicle Technologies...

396

Kickoff Meeting for New Fuel Cell Projects  

Energy.gov (U.S. Department of Energy (DOE))

This presentation by Reg Tyler of the DOE Golden Field Office was given at a meeting on new fuel cell projects in February 2007.

397

Tribal Renewable Energy Advanced Course: Project Development...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development and Financing Essentials Tribal Renewable Energy Advanced Course: Project Development and Financing Essentials Watch the DOE Office of Indian Energy advanced course...

398

Tribal Renewable Energy Advanced Course: Project Development...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concepts Tribal Renewable Energy Advanced Course: Project Development Concepts Watch the DOE Office of Indian Energy renewable energy course entitled "Tribal Renewable Energy...

399

SunZia Southwest Transmission Project Comments  

Energy Savers (EERE)

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

400

Rooftop Unit Network Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network Project Network Project RTU Network Project Michael Brambley, Ph.D. Pacific Northwest National Laboratory Michael.Brambley@pnnl.gov (509) 375-6875 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Packaged air conditioners and heat pumps (RTUs) are used in about 58% of all cooled commercial buildings, serving about 69% of the cooled commercial building floor space (EIA 2003) - Navigant estimates packaged A/C uses 0.9 quads of electricity for cooling annually and

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Cleanup Project Idaho Cleanup Project Sodium Bearing Waste Treatment Project May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project Table of Contents 1.0 Introduction........................................................................................................................................... 1 2.0 Scope and Methodology ....................................................................................................................... 2

402

Building Technologies Office: Small- and Medium-Sized Building Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

Small- and Medium-Sized Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project to someone by E-mail Share Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Facebook Tweet about Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Twitter Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Google Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Delicious Rank Building Technologies Office: Small- and Medium-Sized Building

403

Building Technologies Office: Open-Protocol Platform for Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Open-Protocol Platform Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project to someone by E-mail Share Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Facebook Tweet about Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Twitter Bookmark Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Google Bookmark Building Technologies Office: Open-Protocol Platform for Commercial Building Operations and Energy Management Algorithm Research Project on Delicious Rank Building Technologies Office: Open-Protocol Platform for

404

Building Technologies Office: Advanced Insulation for High Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Insulation for Advanced Insulation for High Performance Cost-Effective Wall, Roof, and Foundation Systems Research Project to someone by E-mail Share Building Technologies Office: Advanced Insulation for High Performance Cost-Effective Wall, Roof, and Foundation Systems Research Project on Facebook Tweet about Building Technologies Office: Advanced Insulation for High Performance Cost-Effective Wall, Roof, and Foundation Systems Research Project on Twitter Bookmark Building Technologies Office: Advanced Insulation for High Performance Cost-Effective Wall, Roof, and Foundation Systems Research Project on Google Bookmark Building Technologies Office: Advanced Insulation for High Performance Cost-Effective Wall, Roof, and Foundation Systems Research Project on Delicious Rank Building Technologies Office: Advanced Insulation for High

405

Building Technologies Office: Nano-Enabled Titanium Dioxide Ultraviolet  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-Enabled Titanium Nano-Enabled Titanium Dioxide Ultraviolet Protective Layers for Cool-Color Roofing Research Project to someone by E-mail Share Building Technologies Office: Nano-Enabled Titanium Dioxide Ultraviolet Protective Layers for Cool-Color Roofing Research Project on Facebook Tweet about Building Technologies Office: Nano-Enabled Titanium Dioxide Ultraviolet Protective Layers for Cool-Color Roofing Research Project on Twitter Bookmark Building Technologies Office: Nano-Enabled Titanium Dioxide Ultraviolet Protective Layers for Cool-Color Roofing Research Project on Google Bookmark Building Technologies Office: Nano-Enabled Titanium Dioxide Ultraviolet Protective Layers for Cool-Color Roofing Research Project on Delicious Rank Building Technologies Office: Nano-Enabled Titanium Dioxide

406

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2011 August 25, 2011 CX-006539: Categorical Exclusion Determination Boulder Wind Power Advanced Gearless Drivetrain CX(s) Applied: A9, B3.6 Date: 08/25/2011 Location(s): Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2011 CX-006509: Categorical Exclusion Determination Fairbanks Geothermal Energy Project CX(s) Applied: A9, B3.1, B5.12 Date: 08/25/2011 Location(s): Fairbanks, Alaska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 24, 2011 CX-006587: Categorical Exclusion Determination Novel Geothermal Development of Deep Sedimentary Systems in the United States CX(s) Applied: A9, B3.6 Date: 08/24/2011 Location(s): Salt Lake City, Utah Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

407

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 CX-006829: Categorical Exclusion Determination Transportation fuel Cell System Cost Assessment CX(s) Applied: A9 Date: 09/20/2011 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 20, 2011 CX-006860: Categorical Exclusion Determination Johnston Avenue Solar Project CX(s) Applied: A9 Date: 09/20/2011 Location(s): Hamilton Township, Mercer County, New Jersey Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 20, 2011 CX-006854: Categorical Exclusion Determination Plant Transformer Purchase - Installation of a Low Flow Unit at the Abiquiu Hydroelectric Plant CX(s) Applied: B4.6 Date: 09/20/2011 Location(s): County of Los Alamos, New Mexico Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office

408

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2010 16, 2010 CX-003707: Categorical Exclusion Determination Hawaii Renewable Energy Development Venture CX(s) Applied: A9, B3.6, B5.1 Date: 09/16/2010 Location(s): Hawaii Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 16, 2010 CX-003701: Categorical Exclusion Determination Bio-Diesel Cellulosic Ethanol Research Project CX(s) Applied: A9 Date: 09/16/2010 Location(s): Hendry County, Florida Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 16, 2010 CX-003699: Categorical Exclusion Determination Multi-Level Energy Storage and Controls for Large-Scale Wind Energy Integration CX(s) Applied: A9, B3.6 Date: 09/16/2010 Location(s): Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

409

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2010 12, 2010 CX-002958: Categorical Exclusion Determination An Undergraduate Minor in Wind Energy Science, Engineering, and Policy CX(s) Applied: A9 Date: 07/12/2010 Location(s): Iowa Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 12, 2010 CX-002955: Categorical Exclusion Determination Hawaii Hydrogen Power Park - Technology Validation of a Hydrogen Fueling System CX(s) Applied: B5.1 Date: 07/12/2010 Location(s): Hawaii, Hawaii Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 12, 2010 CX-002950: Categorical Exclusion Determination Energy Efficient Lighting on Green Roadway Demonstration Project CX(s) Applied: B5.1 Date: 07/12/2010 Location(s): Miami-Dade County, Florida Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

410

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 CX-005075: Categorical Exclusion Determination Solar Panel and Induction Lighting Project CX(s) Applied: A9, B5.1 Date: 01/27/2011 Location(s): Tamarac, Florida Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 27, 2011 CX-005068: Categorical Exclusion Determination City of Riverside, California CX(s) Applied: A9, A11, B5.1 Date: 01/27/2011 Location(s): Riverside, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 27, 2011 CX-005067: Categorical Exclusion Determination Developing Thermal Conversion Options for Biorefinery Residues CX(s) Applied: B3.6 Date: 01/27/2011 Location(s): Mulga, Alabama Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 26, 2011 CX-005413: Categorical Exclusion Determination

411

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-002381: Categorical Exclusion Determination Green Neighborhood Pilot Program - S CX(s) Applied: A9, A11, B5.1 Date: 05/13/2010 Location(s): Newark, New Jersey Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 13, 2010 CX-002378: Categorical Exclusion Determination Electric Vehicles and Charging Stations CX(s) Applied: B5.1 Date: 05/13/2010 Location(s): Saint Paul, Minnesota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 13, 2010 CX-002377: Categorical Exclusion Determination Offshore Wind Technology Data Collection Project CX(s) Applied: A9 Date: 05/13/2010 Location(s): Lake Michigan, Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 13, 2010 CX-002324: Categorical Exclusion Determination

412

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005162: Categorical Exclusion Determination Green Chemistry - CEAM Phase 3 - Working Bug LLC CX(s) Applied: B5.1 Date: 02/08/2011 Location(s): Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 8, 2011 CX-005137: Categorical Exclusion Determination Agrilectric Power Partners - Biomass Renewable Energy Enhancement and Efficiency Project CX(s) Applied: B5.1 Date: 02/08/2011 Location(s): Lake Charles, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 8, 2011 CX-005136: Categorical Exclusion Determination Wind Turbine Infrastructure for Green Energy and Research on Wind Power in Delaware CX(s) Applied: A9, B3.1 Date: 02/08/2011 Location(s): Delaware Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

413

Categorical Exclusion Determinations: Sandia Site Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 11, 2010 March 11, 2010 CX-002257: Categorical Exclusion Determination Drilling Research Intermediate Level System Project Activities CX(s) Applied: B3.11 Date: 03/11/2010 Location(s): New Mexico Office(s): NNSA-Headquarters, Sandia Site Office March 9, 2010 CX-002260: Categorical Exclusion Determination Penetrator Testing with Mobile Gas Guns and Mobile Davis Guns CX(s) Applied: B3.11 Date: 03/09/2010 Location(s): Socorro, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office March 9, 2010 CX-002259: Categorical Exclusion Determination Genetic Engineering of Cyanobacteria as Biodiesel Feedstock CX(s) Applied: B3.12 Date: 03/09/2010 Location(s): New Mexico Office(s): NNSA-Headquarters, Sandia Site Office March 9, 2010 CX-002258: Categorical Exclusion Determination Reconstruct East Roadway in Tech Area III

414

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2011 24, 2011 CX-006023: Categorical Exclusion Determination Oregon Solar Highway CX(s) Applied: A9, B3.1 Date: 05/24/2011 Location(s): West Linn,Oregon Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 23, 2011 CX-005992: Categorical Exclusion Determination American Recovery and Reinvestment Act/State Energy Program - State of Louisiana Community Church Unitarian CX(s) Applied: B5.1 Date: 05/23/2011 Location(s): New Orleans, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 20, 2011 CX-005873: Categorical Exclusion Determination Placer County Biomass Utilization Pilot Project CX(s) Applied: A9 Date: 05/20/2011 Location(s): Placer County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

415

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 9, 2011 February 9, 2011 CX-005385: Categorical Exclusion Determination Low Cost High Concentration Photovoltaic Power Systems for Utility Power Generation -Sandia Site CX(s) Applied: B5.1 Date: 02/09/2011 Location(s): Albuquerque, New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 8, 2011 CX-005165: Categorical Exclusion Determination 215 West Cabarrus Street Electric Vehicle Charging Station CX(s) Applied: B5.1 Date: 02/08/2011 Location(s): Raleigh, North Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 8, 2011 CX-005164: Categorical Exclusion Determination Center City Recycling Project CX(s) Applied: B5.1 Date: 02/08/2011 Location(s): Charlotte, North Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

416

Categorical Exclusion Determinations: Sandia Site Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 9, 2010 July 9, 2010 CX-004190: Categorical Exclusion Determination American Recovery and Reinvestment Act Projects at National Solar Thermal Test Facility CX(s) Applied: B1.15, B1.16, B3.6, B3.11 Date: 07/09/2010 Location(s): New Mexico Office(s): Sandia Site Office June 25, 2010 CX-004192: Categorical Exclusion Determination Site 9940 New Training Venue and Parking Lot Expansion CX(s) Applied: B1.15 Date: 06/25/2010 Location(s): New Mexico Office(s): Sandia Site Office June 25, 2010 CX-004191: Categorical Exclusion Determination Offsite Training, Technology Transfer, and Field Demonstration Activities CX(s) Applied: B1.2 Date: 06/25/2010 Location(s): New Mexico Office(s): Sandia Site Office June 14, 2010 CX-004210: Categorical Exclusion Determination Building 833, Room 5 Renovation

417

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2011 18, 2011 CX-005878: Categorical Exclusion Determination Heritage Aquatic Complex - Solar Photovoltaic Project CX(s) Applied: B5.1 Date: 05/18/2011 Location(s): Henderson, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 18, 2011 CX-005875: Categorical Exclusion Determination Hawaii Hydrogen Power Park - Technology Validation of a Hydrogen Fueling System CX(s) Applied: B5.1 Date: 05/18/2011 Location(s): Honolulu, Hawaii Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 17, 2011 CX-005930: Categorical Exclusion Determination Biofuel Micro-Refineries for Local Sustainability CX(s) Applied: A9, B3.1, B3.6 Date: 05/17/2011 Location(s): Memphis, Tennessee Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

418

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-003345: Categorical Exclusion Determination Integrated Renewable Energy and Campus Sustainability Initiative CX(s) Applied: A9 Date: 08/12/2010 Location(s): Decorah, Iowa Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 12, 2010 CX-003417: Categorical Exclusion Determination Energy Efficiency Projects CX(s) Applied: B5.1 Date: 08/12/2010 Location(s): Plover, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 12, 2010 CX-003405: Categorical Exclusion Determination Blue Ridge Community Unit School District #18 CX(s) Applied: B5.1 Date: 08/12/2010 Location(s): Mansfield, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 11, 2010 CX-003358: Categorical Exclusion Determination

419

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-001897: Categorical Exclusion Determination VoltStar Energy Efficiency Project CX(s) Applied: B2.2, B5.1 Date: 04/21/2010 Location(s): Schaumburg, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 21, 2010 CX-001873: Categorical Exclusion Determination Fluorecycle, Inc. CX(s) Applied: B2.5, B5.1 Date: 04/21/2010 Location(s): Ingleside, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 21, 2010 CX-001893: Categorical Exclusion Determination Hiawatha Community Unit School District (CUSD) #426 Geothermal CX(s) Applied: B5.1 Date: 04/21/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 21, 2010 CX-001890: Categorical Exclusion Determination

420

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2010 14, 2010 CX-004743: Categorical Exclusion Determination New River Solar Thermal Hot Water Project CX(s) Applied: B5.1 Date: 12/14/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 14, 2010 CX-004741: Categorical Exclusion Determination Ocean Thermal Energy Conversion Cold Water Pipe-Platform Subsystem Dynamic Interaction Validation CX(s) Applied: A9, B3.6 Date: 12/14/2010 Location(s): Manassas, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 14, 2010 CX-004739: Categorical Exclusion Determination Evaluation of Wilcox Geothermal Reservoir and Demonstration of Geothermal Energy Production -Phase 1 CX(s) Applied: A9, B3.1 Date: 12/14/2010 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-002559: Categorical Exclusion Determination Washington Credit Enhancement CX(s) Applied: B5.1 Date: 05/20/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 20, 2010 CX-002492: Categorical Exclusion Determination Southern Illinois University Carbondale: Stone Center Geothermal CX(s) Applied: B5.1 Date: 05/20/2010 Location(s): Carbondale, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 20, 2010 CX-002491: Categorical Exclusion Determination Champaign Unit 4 School District: Westview Elementary School - Ground Source Heat Pump Project CX(s) Applied: B5.1 Date: 05/20/2010 Location(s): Champaign, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

422

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003896: Categorical Exclusion Determination Energy Efficient Buildings - County of Salt Lake CX(s) Applied: B5.1 Date: 09/07/2010 Location(s): Salt Lake County, Utah Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 7, 2010 CX-003875: Categorical Exclusion Determination Long Island Biofuels Alliance CX(s) Applied: A9, B3.6, B5.1 Date: 09/07/2010 Location(s): Stony Brook, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 7, 2010 CX-003871: Categorical Exclusion Determination Greenhouse Gas to Energy Project - Wilkes County CX(s) Applied: B5.1 Date: 09/07/2010 Location(s): Wilkes County, North Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 7, 2010

423

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-000619: Categorical Exclusion Determination Oklahoma State Energy Program American Recovery and Reinvestment Act - Metropolitan Tulsa Transit Authority CX(s) Applied: B5.1 Date: 01/20/2010 Location(s): Tulsa, Oklahoma Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 20, 2010 CX-000620: Categorical Exclusion Determination gridSMART - Public Service Company of Oklahoma CX(s) Applied: B5.1 Date: 01/20/2010 Location(s): Oklahoma Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 20, 2010 CX-000627: Categorical Exclusion Determination San Francisco Solar Financing Project CX(s) Applied: A9, A11 Date: 01/20/2010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

424

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2010 4, 2010 CX-003231: Categorical Exclusion Determination Wyoming American Recovery and Reinvestment Act State Energy Program CX(s) Applied: A1, A9, B5.1 Date: 08/04/2010 Location(s): Wyoming Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 4, 2010 CX-003230: Categorical Exclusion Determination Wind Turbine Gearbox Remanufacturing CX(s) Applied: B2.2, B5.1 Date: 08/04/2010 Location(s): Johnson Creek, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 4, 2010 CX-003229: Categorical Exclusion Determination Energy Efficiency Project CX(s) Applied: B5.1 Date: 08/04/2010 Location(s): Peshtigo, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 4, 2010 CX-003228: Categorical Exclusion Determination

425

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-001503: Categorical Exclusion Determination Geothermal Technology Program CX(s) Applied: A9, B5.1 Date: 04/01/2010 Location(s): Nashville, Tennessee Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 1, 2010 CX-001497: Categorical Exclusion Determination Harsh Environment Silicon Carbide Sensor Technology for Geothermal Instrumentation CX(s) Applied: B3.6, A9 Date: 04/01/2010 Location(s): Berkeley, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 1, 2010 CX-001500: Categorical Exclusion Determination Forrest County Geothermal Energy Project CX(s) Applied: B3.1, A9 Date: 04/01/2010 Location(s): Forrest County, Mississippi Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

426

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-000920: Categorical Exclusion Determination South Central Solar Consortium CX(s) Applied: A9, B5.1 Date: 02/23/2010 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000945: Categorical Exclusion Determination Solar Thermal Demonstration Project CX(s) Applied: B5.1, B2.5 Date: 02/22/2010 Location(s): Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000934: Categorical Exclusion Determination Development of Biofuels CX(s) Applied: B3.6 Date: 02/22/2010 Location(s): Las Vegas, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000931: Categorical Exclusion Determination Center for Biomass Utilization

427

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2011 September 15, 2011 CX-006800: Categorical Exclusion Determination Solar Grade Silicon from Agricultural Byproducts CX(s) Applied: B3.6 Date: 09/15/2011 Location(s): Ann Arbor, Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 13, 2011 CX-006798: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Program: Activity 4 - Government Building Demonstration Projects CX(s) Applied: B5.1 Date: 09/13/2011 Location(s): Louisville, Kentucky Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 9, 2011 CX-006807: Categorical Exclusion Determination Energy Production with Innovative Methods of Geothermal Heat Recovery CX(s) Applied: A9 Date: 09/09/2011 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

428

Categorical Exclusion Determinations: Golden Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2010 4, 2010 CX-003228: Categorical Exclusion Determination Vermont Biofuels Initiative: Bournes CX(s) Applied: B3.6 Date: 08/04/2010 Location(s): Vermont Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 4, 2010 CX-003226: Categorical Exclusion Determination Parris Island Wind Resource Assessment; National Renewable Energy Laboratory Tracking Number 10-032 CX(s) Applied: A9, B3.1 Date: 08/04/2010 Location(s): Parris Island, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 4, 2010 CX-003225: Categorical Exclusion Determination Engenuity South Carolina Commercialization and Entrepreneurial Training Project CX(s) Applied: A9 Date: 08/04/2010 Location(s): Columbia, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

429

Office of the Chief Financial Officer .:. Lawrence Berkeley National  

NLE Websites -- All DOE Office Websites (Extended Search)

Human Resources in the OCFO Human Resources in the OCFO Procurement & Property Office of Sponsored Projects & Industry Partnerships Training Travel Office spacer OCFO Home Send Feedback 10 Commandments Don't spend dollars you don't have. Funding must be in the Contract, not just in the Approved Funding Program (AFP) or contract award. Spend funding only on the purpose for which it is intended. Don't mix funding sources for projects without documented rationale. Do not charge research costs to an indirect budget (except for LDRD); i.e., overhead, organization burden, recharges. Have a causal-beneficial relationship between the cost elements of an indirect budget and its corresponding distribution base. Maintain consistency in cost distribution over time. Use Full Cost Recovery - No Subsidies.

430

Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump  

NLE Websites -- All DOE Office Websites (Extended Search)

Ground Source Heat Pump Demonstration Projects to someone by E-mail Ground Source Heat Pump Demonstration Projects to someone by E-mail Share Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump Demonstration Projects on Facebook Tweet about Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump Demonstration Projects on Twitter Bookmark Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump Demonstration Projects on Google Bookmark Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump Demonstration Projects on Delicious Rank Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump Demonstration Projects on Digg Find More places to share Building Technologies Office: Recovery Act-Funded Ground Source Heat Pump Demonstration Projects on AddThis.com...

431

Office of the Chief Financial Officer  

Energy.gov (U.S. Department of Energy (DOE))

Welcome to the U.S. Department of Energy, Office of the Chief Financial Officer. The mission of the Office of the Chief Financial Officer is to assure the effective management and financial integrity of Department of Energy programs, activities, and resources by developing and implementing and monitoring Department-wide policies and systems in the areas of budget administration, program analysis and evaluation, finance and accounting, internal controls, corporate financial systems, and strategic planning.

432

Irene Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Irene Station, African Weather Bureau Irene Station, African Weather Bureau The photos on this site come from the Southern Hemisphere Additional Ozonesondes (SHADOZ) project. Additional photos can be found on the SHADOZ Project Web Site. Photo of the Dobson 89 Instrument The Irene Weather Office Agnes Phahlane sits behind the Dobson and collects Total Ozone Data The lab at the Irene station Cal Archer Prepares an ozonesonde Flight Preparations The balloon is readied The release Back to the SAFARI 2000 Photo Page Index Other Sites: Skukuza, MISR Validation Site | Skukuza, Eddy Covariance Site | C-130 Flight Photos | Sua Pan Site | Irene Weather Station | Fire Studies | Kalahari Transect | Kalahari Transect Sites for Canopy Structure Data | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data

433

Project ID _________________ OSP October 2010  

E-Print Network (OSTI)

· Office for Sponsored Programs 90 Days BEFORE Project End Date Determine if no-cost extension is needed Review project budget Confirm accuracy of all expenses Prevent cost overruns Review and close fringe and F&A allocations Submit cost transfer requests, if needed Review reporting due dates AT Project

Huang, Jianyu

434

Workforce Management Office  

Office of Energy Efficiency and Renewable Energy (EERE)

The Workforce Management Office provides leadership, policy guidance, and technical advice to Office of Energy Efficiency and Renewable Energy (EERE) managers, supervisors, and employees on a broad...

435

Vehicle Technologies Office: Conferences  

Energy.gov (U.S. Department of Energy (DOE))

The Vehicle Technologies Office supports and sponsors conferences related to the Office's goals and objectives. When such conferences are planned and conference information becomes available, it...

436

Contracting Officers Guidebook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contracting Officers Guidebook Energy Lawyers and Contracting Officers Working Group April 12, 2012 Federal Utility Partnership Working Group Spring 2012 Jekyll Island, GA UESC...

437

Responsible University Officer Chief Information Officer  

E-Print Network (OSTI)

technology and that contains procedures on how to handle Information Security Incidents, including contactResponsible University Officer Chief Information Officer Responsible Office Information Technology and manage their own Information Technology must designate employees as primary and back-up Information

Whitton, Mary C.

438

Responsible University Officer Chief Information Officer  

E-Print Network (OSTI)

Technology Services granted by UNC-Chapel Hill. It also applies to each business unit at the University procedures on how to handle Information Security Incidents, including contact information for business unitResponsible University Officer Chief Information Officer Responsible Office Information Technology

Whitton, Mary C.

439

PSU Business Affairs Office Purchasing Office  

E-Print Network (OSTI)

PSU Business Affairs Office Purchasing Office Costco Warehouse Program CARD USER AGREEMENT For each to the PSU Purchasing Office by the following date/time:____________________________________________. All admittance and make purchases at Costco. These cards and the original receipt will be promptly returned

Caughman, John

440

Office Protocols | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Oversight » Safety & Emergency Management Evaluations Services » Oversight » Safety & Emergency Management Evaluations » Office Protocols Office Protocols July 22, 2013 Protocol, Development and Maintenance of Criteria and Review Approach Documents - July 2013 Protocol for the Development and Maintenance of Criteria and Review Approach Documents December 4, 2012 Protocol, High Hazard Nuclear Facility Project Oversight - November 2012 Protocol for High Hazard Nuclear Facility Project Oversight June 26, 2012 Protocol, Required Reading - June 2012 Protocol for Required Reading June 26, 2012 Protocol, Small Team Oversight Activities - June 2012 Protocol for Small Team Oversight Activities (Rev. 1) May 13, 2011 Protocol, Site Leads - May 2011 Protocol for Site Leads May 13, 2011 Protocol, Qualification Standard for the Site Lead Program - May 2011

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Berkeley Lab - ARRA - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab Berkeley Lab Projects infrastructure Advanced Light Source User Support Building Total Project Cost: $35.1 million ARRA funding: $14.7 million The Advanced Light Source (ALS) User Support Building is a three-story, 30,928 gross-square-foot building that will house user-support operations at the ALS. It will include office and lab space for some 80 researchers. The $35-million project is funded by the DOE Office of Science. It will house experiment assembly spaces, conference rooms, and labs. The project is scheduled to be completed in 2011. Go here for more information. Bevatron demolition Total Project Cost: $50 million ARRA funding: $14.3 million Building 51, which houses the Bevatron, is an approximately 125,000 gross-square-foot, steel-frame structure built in the early 1950s. The

442

Integrated Project Team RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Project Team (IPT) Review Module Integrated Project Team (IPT) Review Module March 2010 CD-0 This R O 0 Review Modul OFFICE OF Inte C CD-1 le was piloted F ENVIRO Standard R grated P Rev Critical Decis CD-2 M at the OR U 23 incorporated ONMENTAL Review Plan Project Te view Module sion (CD) Ap CD March 2010 33 Disposition in the Review L MANAGE n (SRP) eam (IPT e pplicability D-3 Project in 200 Module. EMENT T) CD-4 09. Lessons lea Post Ope arned have been eration n Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

443

DOE Grand Junction Projects Office Parkersburg LTSP  

NLE Websites -- All DOE Office Websites (Extended Search)

Parkersburg LTSP Parkersburg LTSP September 1995 Page ii Contents Page 1.0 Introduction.........................................................................................................................................1 1.1 Purpose ..........................................................................................................................................1 1.2 Background ...................................................................................................................................1 1.3 Regulatory Requirements .............................................................................................................1 2.0 Site Description and History .............................................................................................................3

444

Microsoft Office Project - document(s)  

NLE Websites -- All DOE Office Websites (Extended Search)

Predeces Predeces 1 electron lens solenoid 544.5 days 4/5/10 5/22/12 2 Preliminary Design 80 days 4/5/10 7/27/10 3 Final Design 100 days 7/28/10 12/20/10 2 4 Fabrication / Procurement 170 days 7/28/10 4/1/11 2 5 Magnet #1 280.5 days 1/10/11 2/10/12 6 Solenoid Coil Assembly 60 days 2/7/11 5/2/11 4SS+131 7 insulate tube / cure 2 days 2/7/11 2/8/11 8 install cable spool, support tube 1 day 2/9/11 2/9/11 7 9 wind double layer 1 2 days 2/10/11 2/11/11 8 10 wrap, cure 1 day 2/14/11 2/14/11 9 11 wind double layer 2 2 days 2/15/11 2/16/11 10 12 wrap, cure 1 day 2/17/11 2/17/11 11 13 wind double layer 3 2 days 2/18/11 2/22/11 12 14 wrap, cure 1 day 2/23/11 2/23/11 13 15 wind double layer 4 2 days 2/24/11 2/25/11 14 16 wrap, cure 1 day 2/28/11 2/28/11 15 17 wind double layer 5 2 days 3/1/11 3/2/11 16 18 wrap, cure 1 day 3/3/11 3/3/11 17 19 wind double layer 6 2 days

445

DOE Grand Junction Projects Office Edgemont LTSP  

Office of Legacy Management (LM)

Edgemont LTSP Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ....................................................................................................................................... 1 1.1 Purpose ..................................................................................................................................... 1 1.2 Legal and Regulatory Requirements ........................................................................................ 1 1.3 Role of the Department of Energy ........................................................................................... 2 2.0 Final Site Conditions ......................................................................................................................... 3

446

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-006463: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011 CX-006460: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011 CX-006458: Categorical Exclusion Determination Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.1 Date: 08/08/2011 Location(s): Detroit, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy

447

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-005811: Categorical Exclusion Determination Chicago Area Alternative Fuels Deployment Project CX(s) Applied: B5.1 Date: 05/13/2011 Location(s): Chicago, Illinois Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 13, 2011 CX-005809: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 05/13/2011 Location(s): Mercer Island, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 13, 2011 CX-005808: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 05/13/2011 Location(s): Mercer Island, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

448

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-000997: Categorical Exclusion Determination Biodiesel Infrastructure Project (PrairieFire) CX(s) Applied: A1, A9, B5.1 Date: 01/27/2010 Location(s): Monona, Wisconsin Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory January 27, 2010 CX-000998: Categorical Exclusion Determination Biodiesel Infrastructure Project (Coulee) CX(s) Applied: A1, A9, B5.1 Date: 01/27/2010 Location(s): Blair, Wisconsin Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory January 27, 2010 CX-000999: Categorical Exclusion Determination Biodiesel In-line Blending Project (Innovation) CX(s) Applied: A1, A9, B5.1 Date: 01/27/2010 Location(s): Milwaukee, Wisconsin Office(s): Energy Efficiency and Renewable Energy, National Energy

449

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-001692: Categorical Exclusion Determination MacDonald Miller Financing Packages for Utility Based Energy Efficient Projects CX(s) Applied: B5.1 Date: 04/13/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 13, 2010 CX-001689: Categorical Exclusion Determination American Recovery and Reinvestment Act (ARRA) State Energy Program (SEP) Bay City and Van Vleck Independent School District (ISD) Wind Project CX(s) Applied: A9, A11 Date: 04/13/2010 Location(s): Matagorda County, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 13, 2010 CX-001686: Categorical Exclusion Determination American Recovery and Reinvestment Act (ARRA) State Energy Program (SEP) - Austin Energy Solar Project

450

Office of River Protection (ORP) and Washingotn River Protection Solutions,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of River Protection (ORP) and Washingotn River Protection Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project The Mission of the Office of River Protection is to safely retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS) Partnering Agreement for the DOE-EM Tank Operations Project More Documents & Publications 2011 Annual Workforce Analysis and Staffing Plan Report - Office of River Protection Consent Order, Washington River Protection Solutions, LLC - NCO-2011-01

451

Annual Planning Summaries: Oak Ridge Office (OR) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Office (OR) Oak Ridge Office (OR) Annual Planning Summaries: Oak Ridge Office (OR) Document(s) Available For Download February 23, 2012 2012 Annual Planning Summary for Oak Ridge Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Oak Ridge Office. January 28, 2011 2011 Annual Planning Summary for Oak Ridge Operations Office (OR) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Oak Ridge Operations Office (OR) (See Environmental Management and Science). February 1, 2010 2010 Annual Planning Summary for Oak Ridge (OR) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12

452

Office of the Executive Secretariat  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Secretariat, MA-70 Executive Secretariat, MA-70 Acting Director Carol A. Matthews Special Projects Security Policy and Analysis Group Programmatic Expertise High-level Review and Analysis Correspondence Management Group Correspondence Control & Assignment Correspondence Support FOIA Management Special Projects Receiving and Delivery Administration and Executive Commitments Group eDOCS Executive Commitments Information Management Budget Personnel Administration Office of History and Heritage Resources Institutional Memory History Activities Historic Preservation Litigation Research Customer Research Archives Administration May 2013 Deputy Director Carol A. Matthews Federal Advisory Committee Management

453

Golden Field Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1617 Cole Boulevard Golden , Colorado 80401-3393 DOE/EA-1791 FINDING OF NO SIGNIFICANT IMPACT UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIllM PROJECT AGENCY: U.S. Department of Energy, Golden Field Office ACTION : Finding of No Significant Impact (FONSI) SUMMARY: The U. S. Department of Energy (DOE) is proposing to authorize the expenditure of Federal funding by the University of Minnesota to design, permit, and construct a wind turbine research facility I. This funding has been appropriated under the American Recovery and Reinvestment Act of2009. The University would use the funding to install a wind turbine research facility at its University of Minnesota Outreach Research and Education (UMore) Park in Rosemount, Minnesota. The proposed research facility would consist of a 2.5-megawatt-

454

Golden Field Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1.862 DOE/EA-1.862 FINDING OF NO SIGNIFICANT IMPACT FOR THE ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN AGENCY: U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The U.S. Department of Energy (DOE) provided Federal funding, appropriated under the American Recovery and Reinvestment Act of 2009, to the Wisconsin Department of Commerce (now the Wisconsin Economic Development Corporation) under the State Energy Program (SEP). The State proposes to provide a £2 million loan from its SEP funds to the Oneida Seven Generations Corporation (Oneida) to construct and operate an energy recovery facility that would produce electricity from

455

Program or Field Office:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

actions at the Central Nevada Test area actions at the Central Nevada Test area . LM # 43 - 11 Location: Nye County, Nevada Proposed Action or Project Description: The Office of Legacy Management conducts routine activities at three parcels (UC-1, UC -3, and UC-4), which are collectively called the Central Nevada Test Area (CNTA). The sites are located in south-central Nevada in Nye County, approximately 30 miles north of Warm Springs. The U.S. Atomic Energy Commission (predecessor agency to the DOE) acquired the CNTA in the early 1960s to develop alternative sites to the Nevada Test site for underground nuclear testing. Three emplacement boreholes (UC-1, UC-3 and UC-4) were drilled on the three parcels for underground nuclear testing. Only one underground nuclear test was conducted in borehole UC-1; the UC-3 and UC-4 boreholes were reclaimed.

456

Office of Information Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE COURT REPORTERS, INC. EXECUTIVE COURT REPORTERS, INC. (301) 565-0064 1 NATIONAL COAL COUNCIL 2007 FALL FULL COUNCIL MEETING Hilton Washington Embassy Row 2015 Massachusetts Avenue, NW Washington, D.C. 8:30 a.m. Wednesday, November 14, 2007 EXECUTIVE COURT REPORTERS, INC. (301) 565-0064 2 I N D E X AGENDA ITEM: PAGE: Welcome and Opening Remarks 3 NCC Chair Georgia Nelson Remarks 7 Under Secretary of Energy Bud Albright Council Business 12 Presentation on Department of Defense CTL 21 Projects Roger Bezdek, President Management Information Services, Inc. Presentation on the Development and 43 Commercialization of the TIPS Oxy-Fuel Process Alex Fassbender, Chief Technology Officer and Executive Vice President

457

Office of Security and Emergency Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Security and Emergency Management Office of Security and Emergency Management The Security and Emergency Management page is designed to give newcomers and veterans alike an introduction and refresher about our activities. We hope you will find it useful. Much of this page's contents are oriented to reindustrialization and other managers of new DOE projects and programs. Feel free to contact the designated key personnel for assistance. Access Authorization Branch Using established guidelines and the "whole person concept," we evaluate and adjudicate informaton about those who need clearances which is developed during background investigations. The objective is to render access determinations that are in the best interest of national security. We also provide security education and awareness information, personnel security program support, and visitor control and foreign travel support to the Oak Ridge Office, the Paducah-Portsmouth Project Office, and the Thomas Jefferson National Accerelator Facility.

458

Fermi Site Office Post Office Box 2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fermi Site Office Fermi Site Office Post Office Box 2000 Batavia, Illinois 60510 JAN 14 2011 Scott Blake Harris, General Counsel GC-1 FORS SUBJECT: FERMl SITE OFFICE (FSO) 201 1 ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUIMMARY The Department of Energy (DOE) Order 451 .I B, Change 2, requires Secretarial Officers and Heads of Field Organizations to submit a NEPA Annual Planning Summary to the Office of General Counsel. Per your December 8, 2010 memorandum and guidance provided by the Office of NEPA Policy and Compliance (GC-54), our Annual NEPA Planning Summary is enclosed. We have identified one on-going environmental assessment (EA). No environmental impact statements (EISs) are on-going and two new EAs and one EIS are expected to be prepared beginning in the next 12 to 24 months.

459

Project Definition Rating Index (PDRI)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for...

460

Tribal Energy Project Development Process  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Office of Indian Energy has developed the following five-step project development and financing process that focuses on key decision points and outlines a chronological path to smart...

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion Determinations: Program and Field Offices |  

NLE Websites -- All DOE Office Websites (Extended Search)

Determinations: Program and Field Offices Determinations: Program and Field Offices Categorical Exclusion Determinations: Program and Field Offices This page contains links (below) to pages on DOE Program, Field, or Site Office websites containing the CX determinations required to be posted under this policy, and also some for which documentation and posting are optional, i.e., determinations involving classes of actions listed in Appendix A or made before the policy's effective date of November 2, 2009. You may browse the determinations posted on each of the websites at the links below (you would be leaving this website), or view them directly on this website. SECRETARIAL OFFICES Advanced Research Projects Agency-Energy Advanced Technology Vehicles Manufacturing Loan Program Civilian Radioactive Waste Management

462

Argonne Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Argonne Site Office (ASO) ASO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Argonne Site Office U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 Argonne Site Office Pictured Right: Advanced Photon Source Advanced Photon Source 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Argonne Site Office (ASO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Argonne National Laboratory (ANL) in Argonne, Illinois. ANL is one of ten Office of Science Laboratories and is a multi-program laboratory with a primary mission on delivering breakthrough science and

463

Berkeley Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Berkeley Site Office (BSO) BSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: bsowebinfo@bso.science.doe.gov Berkeley Site Office Photo © University of California, Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Berkeley Site Office (BSO) is an organization within the U.S. Department of Energy's (DOE) Office of Science with responsibility to oversee and administer the Management and Operating (M&O) contract for the Lawrence Berkeley National Laboratory (LBNL) in Berkeley, California. LBNL, one of ten Office of Science Laboratories, is a multi-program

464

Fermi Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Fermi Site Office (FSO) FSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630) 840-3285 Fermi Site Office Pictured Right: Fermi view to the Northeast Fermi View to Northeast 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Fermi Site Office (FSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Fermi National Accelerator Laboratory (FNAL) in Batavia, Illinois. FNAL is one of ten Office of Science Laboratories and is a single-program

465

SLAC Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home SLAC Site Office (SSO) SSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 SLAC Site Office Pictured Right: Stanford Synchrotron Radiation Lightsource Facility SLAC National Accelerator Laboratory 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The SLAC Site Office (SSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the SLAC National Accelerator Laboratory (SLAC) in Menlo Park, California. SLAC is one of ten Office of Science Laboratories and is a multi-program

466

Ames Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Ames Site Office (AMSO) AMSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Ames Site Office U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-6167 F: (630) 252-2855 Ames Site Office Pictured Right: Ames Laboratory Ames Laboratory 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Ames Site Office (AMSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Ames Laboratory in Ames, Iowa. Ames Laboratory is one of ten Office of Science Laboratories and is a single program laboratory with a primary mission on delivering breakthrough science and technology in the area of Basic Energy Sciences. The AMSO is

467

Brookhaven Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Brookhaven Site Office (BHSO) BHSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: TellDOE@bnl.gov Brookhaven Site Office Pictured Right: Ariel view of Brookhaven National Laboratory BHSO 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Brookhaven Site Office (BHSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Brookhaven National Laboratory (BNL) in Upton, New York. BNL is one of ten Office of Science Laboratories and is a multi-program laboratory with a primary mission on delivering breakthrough science and

468

Princeton Site Office Homepage | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home Home Princeton Site Office (PSO) PSO Home About Current Projects Contract Management Environment, Safety and Health (ES&H) Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 Princeton Site Office Pictured Right: Aerial view of Princeton Plasma Physics Laboratory Aerial view of Princeton Plasma Physics Laboratory. 1 of 2 Print Text Size: A A A RSS Feeds FeedbackShare Page The Princeton Site Office (PSO) is an organization within the U.S. Department of Energy's Office of Science with responsibility to oversee and manage the Management and Operating (M&O) contract for the Princeton Plasma Physics Laboratory (PPPL) in Princeton, New Jersey. PPPL is one of ten Office of Science Laboratories and is a multi-program

469

THE SECRETARY'S OFFICE  

Science Journals Connector (OSTI)

THE SECRETARY'S OFFICE ... Fields such as engineering and science that attract principally men were affected most. ...

1952-03-24T23:59:59.000Z

470

Project Development and Finance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development and Development and Finance Project Development and Finance Below are resources for Tribes on energy project development and finance. Developing Tribal Energy Projects: Community Energy Planning Highlights a strategic energy planning process for Tribes, including examples of how the process has helped Tribes advance their clean energy projects. Source: DOE Office of Indian Energy Developing Tribal Energy Projects: Project Development Fundamentals Provides an overview of the five-step tribal renewable energy project development and financing process developed by the DOE Office of Indian Energy and includes examples from Tribes that have used the process to help move their clean energy projects forward. Source: DOE Office of Indian Energy Developing Tribal Energy Projects: Evaluating Project Potential and Options

471

Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Dioxide-Based Carbon Dioxide-Based Heat Pump Water Heater Research Project to someone by E-mail Share Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater Research Project on Facebook Tweet about Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater Research Project on Twitter Bookmark Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater Research Project on Google Bookmark Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater Research Project on Delicious Rank Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater Research Project on Digg Find More places to share Building Technologies Office: Carbon Dioxide-Based Heat Pump Water Heater Research Project on AddThis.com...

472

Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater  

NLE Websites -- All DOE Office Websites (Extended Search)

Gas-Fired Absorption Gas-Fired Absorption Heat Pump Water Heater Research Project to someone by E-mail Share Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater Research Project on Facebook Tweet about Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater Research Project on Twitter Bookmark Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater Research Project on Google Bookmark Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater Research Project on Delicious Rank Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater Research Project on Digg Find More places to share Building Technologies Office: Gas-Fired Absorption Heat Pump Water Heater Research Project on AddThis.com...

473

Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Multi-Function Multi-Function Fuel-Fired Heat Pump Research Project to someone by E-mail Share Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research Project on Facebook Tweet about Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research Project on Twitter Bookmark Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research Project on Google Bookmark Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research Project on Delicious Rank Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research Project on Digg Find More places to share Building Technologies Office: Multi-Function Fuel-Fired Heat Pump Research Project on AddThis.com... About Take Action to Save Energy Partner with DOE Activities

474

Building Technologies Office: Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Printable Version Share this resource Send a link to Building Technologies Office: Webinars to someone by E-mail Share Building Technologies Office: Webinars on Facebook Tweet about Building Technologies Office: Webinars on Twitter Bookmark Building Technologies Office: Webinars on Google Bookmark Building Technologies Office: Webinars on Delicious Rank Building Technologies Office: Webinars on Digg Find More places to share Building Technologies Office: Webinars on AddThis.com... Popular Links Success Stories Previous Next Lighten Energy Loads with System Design. Warming Up to Pump Heat. Cut Refrigerator Energy Use to Save Money. Tools EnergyPlus Whole Building Simulation Program Building Energy Software Tools Directory High Performance Buildings Database

475

Project Year Project Title  

E-Print Network (OSTI)

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

476

Project Year Project Team  

E-Print Network (OSTI)

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

477

Project Year Project Team  

E-Print Network (OSTI)

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

478

Office Buildings - Full Report  

U.S. Energy Information Administration (EIA) Indexed Site

Office Buildings - Full Report Office Buildings - Full Report file:///C|/mydocs/CBECS2003/PBA%20report/office%20report/office_pdf.html[9/24/2010 3:33:25 PM] Although no one building type dominates the commercial buildings sector, office buildings are the most common and account for more than 800,000 buildings or 17 percent of total commercial buildings. Offices comprised more than 12 billion square feet of floorspace, 17 percent of total commercial floorspace, the most of any building type. Types of Office Buildings The 2003 CBECS Detailed Tables present data for office buildings along with other principal building activities (see Detailed Tables B13 and B14, for example). Since office buildings comprise a wide range of office-related activities, survey respondents were presented with a

479

Fermilab | Directorate | Office of Integrated Planning & Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Integrated Planning & Performance Management (IPPM) Office of Integrated Planning & Performance Management (IPPM) Integrated Planning Diagram Integrated Planning Diagram [Download PPT] Mission: The Office of Integrated Planning and Performance Management (IPPM) within the Fermilab Directorate provides systems and management processes for institutional planning and performance assessment and evaluation. The office of IPPM leads multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. IPPM Facilitates:

480

Microsoft Word - P-12711 Cobscook Bay Project EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PROJECT PILOT LICENSE Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 (DOE/EA1916) Maine Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 January 2012 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

Note: This page contains sample records for the topic "bartlesville project office" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Technical Information Officers | Scientific and Technical Information  

Office of Scientific and Technical Information (OSTI)

Technical Information Officers Technical Information Officers Print page Print page Email page Email page Technical Information Officers: Serve as the DOE element representatives to STIP and ensure that STI objectives and requirements are incorporated into strategic planning, management information plans, life-cycle procedures from project initiation to close-out, and contract language as appropriate. Coordinate with contractor STI managers and have adequate familiarity with STI activities to discern contractor compliance with the CRD portion of this directive. Coordinate the implementation of appropriate review and release procedures by DOE elements, DOE contractors, and financial assistance recipients as appropriate. Serve as Releasing Officials or coordinate designation and official

482

Mk12A/W78 ground test project (u)  

SciTech Connect

The slides present the scope, objectives and status of the Mk12A1W78 Ground Test Project for the purpose of updating the ICBM Project Officers Group. In addition, project constraints and risks are discussed.

Stokes, Kyle R [Los Alamos National Laboratory

2010-12-01T23:59:59.000Z

483

New Sustainability Office Opens in Tulsa | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Sustainability Office Opens in Tulsa New Sustainability Office Opens in Tulsa New Sustainability Office Opens in Tulsa March 23, 2010 - 2:41pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy The mayor of Tulsa formed a new sustainability office to oversee almost $4 million of Recovery Act funds allotted for energy efficiency projects that city officials hope will help offset a $10 million budget cut and rebuild its slumping economy. Brett Fidler, who served as a special sustainability adviser for the mayor's office, was chosen as director after Mayor Dewey Bartlett signed an executive order earlier this year to create the Office of Sustainability. Starting this spring, the new office will begin implementing a slew of sustainability initiatives that could save the city

484

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-001297: Categorical Exclusion Determination Clean Start Propane Refueling, Vehicle Incentive and Outreach CX(s) Applied: A7 Date: 03/22/2010 Location(s): Los Angeles, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 21, 2010 CX-001196: Categorical Exclusion Determination High-Potential Working Fluids for Next Generation Binary Cycle Geothermal Power Plants CX(s) Applied: A9, B3.6 Date: 03/21/2010 Location(s): Niskayuna, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 21, 2010 CX-001421: Categorical Exclusion Determination Ohio Biorefinery Project CX(s) Applied: B3.6, A9 Date: 03/21/2010 Location(s): Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

485

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-006061: Categorical Exclusion Determination Photovoltaic System at Town Landfill CX(s) Applied: B5.1 Date: 06/08/2011 Location(s): Happauge, New York Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 8, 2011 CX-006060: Categorical Exclusion Determination City of Trenton Renewable Energy Feasibility Study CX(s) Applied: A9, A11 Date: 06/08/2011 Location(s): Trenton, New Jersey Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 8, 2011 CX-006049: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 06/08/2011 Location(s): Kent, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 8, 2011 CX-006047: Categorical Exclusion Determination

486

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

150: Categorical Exclusion Determination 150: Categorical Exclusion Determination A World-Class University-Industry Consortium for Wind Energy Research, Education, and Workforce Development CX(s) Applied: A9, A11, B3.6, B5.1 Date: 07/26/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 26, 2010 CX-003149: Categorical Exclusion Determination Hydrogen Technology Electric Vehicle Charging Station CX(s) Applied: B5.1 Date: 07/26/2010 Location(s): Boca Raton, Florida Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 23, 2010 CX-003153: Categorical Exclusion Determination Saint Luke's Miners Memorial Hospital Energy Efficiency Project CX(s) Applied: B5.1 Date: 07/23/2010 Location(s): Coaldale, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy

487

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2010 18, 2010 CX-004288: Categorical Exclusion Determination Carbon Motors Corporation CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Connersville, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004284: Categorical Exclusion Determination Recovery Act: Conducting a 3-Dimensional Converted Shear Wave Project CX(s) Applied: A9, B3.1, B3.7 Date: 10/18/2010 Location(s): Imperial County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004276: Categorical Exclusion Determination Electric Drive Vehicle Demonstration and Infrastructure Evaluation CX(s) Applied: A1, B5.1 Date: 10/18/2010 Location(s): Dallas, Texas Office(s): Energy Efficiency and Renewable Energy, National Energy

488

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY OFFICE OF NEPA POLICY AND COMPLIANCE - STAFF DIRECTORY Carol Borgstrom, Director 202-586-4600 Carol.Borgstrom@hq.doe.gov Lettie Wormley, Secretary 202-586-4610 Lettie.Wormley@hq.doe.gov Eastern Energy and Waste Management Unit Contact Program/Responsibility Special Projects or Topics Brian Costner Brian.Costner@hq.doe.gov 202-586-9924 Unit Leader Yardena Mansoor Yardena.Mansoor@hq.doe.gov 202-586-9326 Office of Environmental Management * Oak Ridge Office * Savannah River Operations Office Office of Fossil Energy * Strategic Reserves * Liquefied Natural Gas (LNG) Office of Electricity Delivery and Energy Reliability * Champlain Hudson Power Express Western Area Power Administration Bonneville Power Administration

489

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2009 30, 2009 CX-001262: Categorical Exclusion Determination Create a Partnership and Energy Efficiency Retrofits CX(s) Applied: A1, A9, B2.5, B5.1 Date: 11/30/2009 Location(s): Campbell, Kentucky Office(s): Energy Efficiency and Renewable Energy November 30, 2009 CX-000218: Categorical Exclusion Determination Texas Tech Great Plains Wind Power Test Facility CX(s) Applied: A9, B3.1, B5.1 Date: 11/30/2009 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 30, 2009 CX-000213: Categorical Exclusion Determination Coasta; Ohio Wind Project CX(s) Applied: A9, B3.1, B3.3 Date: 11/30/2009 Location(s): Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 30, 2009 CX-000212: Categorical Exclusion Determination

490

Categorical Exclusion Determinations: Office of Energy Efficiency and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-002351: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: A1, B5.1 Date: 05/10/2010 Location(s): Portland, Oregon Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 7, 2010 CX-002367: Categorical Exclusion Determination Fort Bend County Energy Efficiency Conservation Block Grant CX(s) Applied: A9, A11, B5.1 Date: 05/07/2010 Location(s): Fort Bend County, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 7, 2010 CX-002307: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant -City of Lincoln, #12- Renewable Energy Project Subgrants CX(s) Applied: A9, A11, B5.1 Date: 05/07/2010 Location(s): Lincoln, Nebraska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

491

Independent Activity Report, Richland Operations Office - June 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2011 June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration [HIAR-RL-2011-06-22] The U.S. Department of Energy's (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), performed an operational awareness review of the Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration. Independent Activity Report, Richland Operations Office - June 2011 More Documents & Publications Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility - August 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 Independent Activity Report, Richland Operations Office - June

492

Strategic Programs Office FY14 Budget At-a-Glance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC PROGRAMS OFFICE STRATEGIC PROGRAMS OFFICE FY14 BUDGET AT-A-GLANCE The mission of the Office of Strategic Programs is to increase the effectiveness and impact of all EERE activities by funding cross-cutting activities and initiatives, analysis, and engagement functions with key stakeholders, the media, and the public. Strategic Programs' projects, work products, and activities directly contribute to realizing EERE's mission, facilitate and amplify the successes of EERE technology offices, and soundly and consistently inform the Assistant Secretary's decisions. What We Do Strategic Programs (SP) is a core, cross-cutting EERE office that focuses on accelerating the development, commercialization,

493

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

494

Project Year Project Team  

E-Print Network (OSTI)

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

495

U. S. DOE petroleum software  

SciTech Connect

Each year, the U.S. DOE sponsors a variety of petroleum-related research projects. Some of the past projects have resulted in development of software that is available free from the DOE's Bartlesville Project Office. This article gives an overview of the following DOE software: Black Oil Applied Simulation Tool I (BOAST II); EOR Predictive Models: CO{sub 2} Miscible Flood, Chemical Flood, Polymer Flood, In-Situ Combustion Steamflood; Horizontal/Slanted Well Model; and Miscible Applied Simulation Techniques (MASTER).

Schneider, C.E. (Conoco Inc. (US))

1991-07-01T23:59:59.000Z

496

Line Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

497

Office of Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management Office of Management The mission of the Department of Energy is to assure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. The mission of the Department of Energy is to assure America's security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. Featured Initiatives Conference Reporting Activities Facilities Initiatives Root Cause Analysis (RCA) & Corrective Action Plan (CAP) Energy Reduction at HQ HQ EMS Policy Freedom of Information Act Financial Assistance Procurement and Acquisition Project Management Career Development Program Project Management Workshops and Awards

498

OFFICE OF THE CHIEF INFORMATION OFFICER (OCIO)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE CHIEF INFORMATION OFFICER (OCIO) THE CHIEF INFORMATION OFFICER (OCIO) FY 2014 HUMAN CAPITAL MANAGEMENT PLAN Executive Summary: The mission of the Office of the Chief Information Officer (OCIO) is to enable the Department of Energy's urgent missions in energy, science, and nuclear security through the power of information and technology in a manner that balances risk with required outcomes in programs that span from open science to national security. DOE promotes effective operations by encouraging performance-based management and facilitating the restructuring of mission- and business-related processes, where appropriate, before making significant IT investments to improve the performance and cost-effectiveness of the Department's information

499

DOE Office of Science - Chicago Office  

NLE Websites -- All DOE Office Websites

spacer spacer spacer spacer About DOE Organization News Contact Us Search Go Button spacer U.S. Department of Energy Science & Technology Energy Sources Energy Efficiency The Environment Prices & Trends National Security Safety & Health spacer Office of Science Chicago Office - Integrated Support Center spacer spacer CURRENT SOLICITATIONS Open Solicitations Unsolicited Proposals spacer spacer BUSINESS OPPORTUNITIES Office of Acquisition and Assistance Energy Related Inventions Doing Business with DOE spacer spacer HOW DO I FIND OUT ABOUT? Educational Materials Frequently Asked Questions Links Human Resources Services Office of Chief Counsel spacer spacer COMMUNITY Special Events Laboratory Community Involvement Programs Public Participation Policy Speakers Bureau

500

Office Buildings - Full Report  

U.S. Energy Information Administration (EIA) Indexed Site

PDF PDF Office Buildings Although no one building type dominates the commercial buildings sector, office buildings are the most common and account for more than 800,000 buildings or 17 percent of total commercial buildings. Offices comprised more than 12 billion square feet of floorspace, 17 percent of total commercial floorspace, the most of any building type. Types of Office Buildings The 2003 CBECS Detailed Tables present data for office buildings along with other principal building activities (see Detailed Tables B13 and B14, for example). Since office buildings comprise a wide range of office-related activities, survey respondents were presented with a follow-up list of specific office types to choose from. Although we have not presented the office sub-category information in the detailed tables we make information