Powered by Deep Web Technologies
Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Relationship of diets and environmental contaminants in wintering bald eagles. [Haliaeetus leucocephalus  

SciTech Connect

We investigated the relationship between diets and potential hazards in contaminants of wintering bald eagles (Haliaeetus leucocephalus) in the Klamath Basin of northern California and southern Oregon. We studied diets by identifying remains of 913 prey items found at perches, examining 341 castings collected from communal night roots, and observing foraging eagles. We determined residues of organochlorine compounds, lead (Pb), and mercury (Hg) in bald eagles and their prey by analyzing eagle blood samples and carcasses and 8 major prey species. Bald eagles fed largely on waterfowl by scavenging cholera-killed ducks and geese and on microtine rodents during mid- to late winter. Residues of organochlorine pesticides and Hg in prey were low, and polychlorinated biphenyls (PCB's) were detected in low concentrations in 9% of prey samples. Means Pb concentrations in prey ranged from 0.15 to 4.79 ppm. Mercury was detected in all eagle blood samples, and Pb was detected in 41% of the bald eagle blood samples. Mean Pb concentration in livers of dead eagles was 2.09 ppm and ranged as high as 27 ppm in an eagle that died of Pb poisoning. Prey of the eagles were relatively free of contaminants with the possible exception of embedded Pb shot in waterfowl, which may present a potential for Pb poisoning of eagles.

Frenzel, R.W.; Anthony, R.G. (Oregon State Univ., Corvallis (USA))

1989-07-01T23:59:59.000Z

2

Behavioral ecology of bald eagles along the northwest coast: a landscape perspective. [Haliaeetus leucocephalus  

Science Conference Proceedings (OSTI)

Much of the range of the bald eagle (Haliaeetus leucocephalus) has been subjected to anthropogenic disturbance of greater magnitude than the natural regimes of pre-European settlement times. Consequently, many eagle populations are depauperate. Eagle populations are large and stable, however, along the relatively pristine Pacific Northwest Coast of North America. This study examines: (1) the behavior and ecology of bald eagles along the northwest coast; and (2) the effects of environmental disturbance and resource dynamics on the ecology and evolution of eagles. The ephemeral nature of food supplies along the northwest coast apparently results in eagles being limited primarily by food stress. The foraging behavior of eagles was analyzed using evolutionary game theory as a theoretical construct. Productivity was found to be variable and generally declining in southeast Alaska. Eagles maximized energy input for survival by feeding opportunistically, making broad-scale movements to find food patches, locating food within a patch by searching for prey or for conspecifics with prey, assessing prey profitability, acquiring food by hunting and stealing, and by defending food through threat displays or fighting. Eagles obtain food for reproduction by defending feeding territories and by storing food in their nests. These strategies and adaptations translate up scale and influence characteristics of the regional population. 34 figs., 21 tabs.

Hansen, A.J.; Dyer, M.I.; Shugart, H.H.; Boeker, E.L.

1986-02-01T23:59:59.000Z

3

Fighting behavior in Bald Eagles: a test of game theory. [Haliaeetus leucocephalus  

Science Conference Proceedings (OSTI)

Seven predictions of evolutionary game theory were examined in field studies of foraging behavior of Bald Eagles (Haliaeetus leucocephalus) wintering in the Chilkat Valley, Alaska. A cost/benefit analysis revealed that the frequencies of two foraging strategies (hunting and stealing from conspecifics) were balanced such that the payoffs of the two were nearly equal. Asymmetries in probable correlates of fighting ability (size and, possibly, spatial position (being in the air vs. on the ground), but not age) and expected gain in victory (hunger level) influenced the outcome of contests over food. Individuals used conditions strategies: small or young birds appeared to hung (rather than steal) relatively more often than others. Pirating eagles often assessed the size and hunger level of food defenders and attacked those most likely to retreat. Contrary to prediction, ritualized displays served to advertise expected gain in victory and were good indicators of subsequent behavior. The level of escalated fighting was inversely related to resource availability. Finally, a graphical model shows that pirating frequency may or may not be influenced by changes in food abundance. The results generally support the predictions of game theory and explain several aspects of Bald Eagle foraging behavior.

Hansen, A.J.

1986-06-01T23:59:59.000Z

4

Lead shot poisons bald eagles  

Science Conference Proceedings (OSTI)

This article describes the controversy between the US Fish and Wildlife Service, the National Wildlife Federation and the increased mortality of bald eagles. The eagles are being poisoned by preying on waterfowl which have ingested lead shot or have been wounded by shot and not recovered. The controversy has resulted in the establishment of new criteria for so-called non-toxic shot waterfowl hunting.

Cohn, J.P.

1985-09-01T23:59:59.000Z

5

Salt River Project`s participation in Arizona`s bald eagle conservation efforts  

SciTech Connect

Bald eagle (Haliaeetus leucocephalus) conservation in Arizona, USA, is a prime example of a successful, cooperative environmental management effort. The Salt River Project (SRP) is an active participant in the statewide bald eagle management activities. This paper summarizes the major components of the statewide program and highlights SRP`s participation in these efforts. The Southwestern Bald Eagle Management Committee (SWBEMC) was formed as a means of coordinating interagency projects. Chaired by the Arizona Game and Fish Department (AGFD), the SWBEMC is comprised of 15 state, federal, tribal, and private agencies. Together, these agencies sponsor the Nest Watch Program, a unique and effective program dedicated to the study, conservation, and recovery of bald eagles in the southwest. Other significant components of the bald eagle management program include nest monitoring, nest search activities, winter counts, and demography studies. 7 refs., 4 figs.

Nobel, T.A. [Salt River Project, Phoenix, AZ (United States)

1996-11-01T23:59:59.000Z

6

High rates of nonbreeding adult bald eagles in southeastern Alaska  

SciTech Connect

Present knowledge of bald eagle (Haliaeetus leucocephalus) demography is derived primarily from populations in environments that have been drastically altered by man. Most reproductive studies were done in the 1960's and 1970's when chemical toxins were inhibiting bald eagle productivity. Earlier, the removal of old-growth forests and decimation of anadromous fish runs by Euro-Americans may have greatly reduced bald eagle abundance from presettlement levels. Historical trends in this species are of interest because fundamental differences may exist between populations in pristine and man-altered environments. One difference may be breeding rate. Surpluses of nonbreeding adult bald eagles during the nesting season are rarely mentioned in the literature. Most surveys of reproductive success focus exclusively on eagles at nest sites, which assumes nearly all adults attempt to breed each year. The authors report that a majority of adults in the relatively pristine habitats of southeastern Alaska do not breed annually. This finding is important because if surpluses of non-breeding adults are a natural feature of the population, then hypotheses on density dependent population regulation and the evolution of delayed maturation are suggested. If, on the other hand, the abundance of nonbreeders is an artifact of recent environmental perturbations, serious population declines may occur in southeastern Alaska.

Hansen, A.J.; Hodges, J.I. Jr.

1985-01-01T23:59:59.000Z

7

Bald eagles of the Hanford National Environmental Research Park  

SciTech Connect

Since 1961, near-yearly aerial surveys of bald eagles along the Hanford reach of the Columbia River have been conducted. Prey resources available to the eagles have also been monitored and we have thus been able to examine predator-prey relationships in a statistical fashion. We report on a unique set of data which provides insight into one of the factors (prey availability) controlling bald eagle wintering populations. The winter distribution of the bald eagle (Haliaeetus leucocephalus) has been reported to closely follow the availability of prey (Servheen 1975, Southern 1963, Shea 1973, Spencer 1976). Fitzner and Hanson (1979) compared twelve years of eagle winter survey data on the Hanford DOE Site with waterfowl numbers and salmon redd densities over the same period and provided some statistical evidence that eagle wintering numbers varied somewhat dependently with changing salmon redd numbers but not with changing waterfowl numbers. This report re-examines Fitzner and Hanson's (1979) twelve year data set and supplies two additional years of data for the Hanford DOE Site in order to gain additional insight into predator-prey interactions.

Fitzner, R.E.; Watson, D.G.; Rickard, W.H.

1980-06-01T23:59:59.000Z

8

Environmental contaminants in bald eagles in the Columbia River estuary  

Science Conference Proceedings (OSTI)

Eggs, blood, and carcasses of bald eagles (Haliaeetus leucocephalus) and fish were collected and breeding success of eagles was monitored in the Columbia River estuary, 1980-87, to determine if contaminants were having an effect on productivity. High levels of dichloro diphenyl dichloroethylene (DDE), polychlorinated biphenyls (PCB's), and 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD) were found in eggs, blood from adults, and 2 eagle carcasses. Detectable levels of DDE and PCB's were found in blood of nestlings indicating they were exposed to these contaminants early in life. Increasing concentrations of DDE and PCB's with age also indicated accumulation of these contaminants. Adult eagles also had higher levels of mercury (Hg) in blood than subadults or young indicating accumulation with age. The high levels of DDE and PCB's were associated with eggshell thinning ([bar x] = 10%) and with productivity ([bar x] = 0.56 young/occupied site) that was lower than that of healthy populations (i.e., [ge]1.00 young/occupied site). DDE and PCB's had a deleterious effect on reproduction of bald eagles in the estuary. The role dioxins play in eagle reproduction remains unclear, but concentrations in eagle eggs were similar to those in laboratory studies on other species where dioxins adversely affected hatchability of eggs. Probable source of these contaminants include dredged river sediments and hydroelectric dams, and the proper management of each may reduce the amount of contaminants released into the Columbia River estuary. 46 refs., 1 fig., 4 tabs.

Anthony, R.G.; Garrett, M.G. (Oregon State Univ., Corvallis (United States)); Schuler, C.A. (Fish and Wildlife Service, Portland, OR (United States))

1993-01-01T23:59:59.000Z

9

Bald eagle survival and population dynamics in Alaska after the Exxon Valdez oil spill  

SciTech Connect

We investigated age-specific annual survival rates for 159 bald eagles (Haliaeetus Leucocephalus) radiotagged from 1989 to 1992 in Prince William Sound (PWS), Alaska. We monitored radio-tagged eagles for {le}3 years beginning 4 months after the Exxon Valdez oil spill. There was no difference (P > 0.10) in survival rates between eagles radiotagged in oiled areas and eagles radiotagged in unoiled areas of PWS. Pooled annual survival rates were 71% for first-year eagles, 95% for subadults, and 88% for adult bald eagles. Most deaths occurred from March to May. We found no indication that survival of bald eagles radiotagged >4 months after the oil spill in PWS was directly influenced by the spill and concluded that any effect of the spill on survival occurred before eagles were radiotagged. A deterministic life table model suggests that the PWS bald eagle population has an annual finite growth rate of 2%. Given the cumulative effects of direct mortality and reduced productivity caused by the oil spill, we predicted that the bald eagle population would return to its pre-spill size by 1992. 27 refs., 2 figs., 2 tabs.

Bowman, T.D.; Bernatowicz, J.A. [Fish and Wildlife Service, Anchorage, AK (United States); Schempf, P.F. [Fish and Wildlife Service, Juneau, AK (United States)

1995-04-01T23:59:59.000Z

10

Bald and Golden Eagles of the SRP. (Annual report, 1986)  

Science Conference Proceedings (OSTI)

Both Bald and Golden Eagles have a prior history of occurrence on the Savannah River Plant (SRP). Sightings of Bald Eagles have been uncommon but persistent, while Golden Eagle sightings have been rare. A one-year survey was conducted to assess the use of the SRP by these two species. Thirty-six Bald Eagles were seen during the study period. No Golden Eagles were observed. Over 90% of the Bald Eagle sightings were on Par Pond; three out of four of these birds were adults. Thirteen percent of the sightings were of paired birds, and the remainder were of solitary individuals. Bald Eagles were observed during every month of the survey. The majority were seen between November and May. Sightings were evenly divided between morning and afternoon hours. Two marked Bald Eagles were observed. Since the conclusion of this study, twenty-two Bald Eagles have been reported. Six were new locality records for the SRP. Four of these sightings were on L-Lake. Bald Eagle use of the SRP is higher than was previously thought; Golden Eagle use remains rare.

Mayer, J.J.; Hoppe, R.T.; Kennamer, R.A.

1986-01-01T23:59:59.000Z

11

Bald and Golden Eagle Protection Act | Open Energy Information  

Open Energy Info (EERE)

Golden Eagle Protection Act Golden Eagle Protection Act Jump to: navigation, search Statute Name Bald and Golden Eagle Protection Act Year 1940 Url [[File:|160px|link=http://permits.fws.gov/ltr/ltr.shtml]] Description References FWS Overview[1] This article is a stub. You can help OpenEI by expanding it. The Bald and Golden Eagle Protection Act (16 U.S.C. 668-668c), enacted in 1940, and amended several times since then, prohibits anyone, without a permit issued by the Secretary of the Interior, from "taking" bald eagles, including their parts, nests, or eggs. The Act provides criminal penalties for persons who "take, possess, sell, purchase, barter, offer to sell, purchase or barter, transport, export or import, at any time or any manner, any bald eagle ... [or any golden eagle], alive or dead, or any part, nest,

12

Mercury concentrations in tissues of Florida bald eagles  

Science Conference Proceedings (OSTI)

We collected 48 blood and 61 feather samples from nestling bald eagles at 42 nests and adult feather samples from 20 nests in north and central Florida during 1991-93. We obtained 32 liver, 10 feather, and 5 blood samples from 33 eagle carcasses recovered in Florida during 1987-93. For nestlings, mercury concentrations in blood (GM = 0.16 ppm wet wt) and feather (GM = 3.23 ppm) samples were correlated (r = 0.69, P = 0.0001). Although nestlings had lower mercury concentrations in feathers than did adults (GM = 6.03 ppm), the feather mercury levels in nestlings and adults from the same nest were correlated (r = 0.63, P eagles (GM = 0.23 ppm) was similar to Florida nestlings but some Florida nestlings had blood mercury concentrations up to 0.61 ppm, more than twice as high as captive adults. Feather mercury concentrations in both nestlings and adults exceeded those in captive eagles, but concentrations in all tissues were similar to, or lower than, those in bald eagles from other wild populations. Although mercury concentrations in Florida eagles are below those that cause mortality, they are in the range of concentrations that can cause behavioral changes or reduce reproduction. We recommend periodic monitoring of mercury in Florida bald eagles for early detection of mercury increases before negative effects on reproduction occur. 26 refs., 5 figs., 2 tabs.

Wood, P.B.; Wood, J.M. [Wes Virginia Univ., Morgantown, WV (United States); White, J.H. [Florida Game and Fresh Water Fish Commission, Eustis, FL (United States)] [and others

1996-01-01T23:59:59.000Z

13

Assessing cumulative impacts to wintering Bald Eagles and their habitats in western Washington  

Science Conference Proceedings (OSTI)

Bald Eagles (Haliaeetus leucocephalus) of Washington, the largest wintering population in the lower 48 states, are subject to numerous pressures and impacts from human activites. An evaluative method potential cumulative impacts of multiple hydroelectric development and logging activities on known and potential eagle use areas. Four resource components include food supply, roost sites, mature riparian forest, and disturbance. In addition to actual estimates of losses in food supply (fish biomass in kg) and habitat (km/sup 2/) in one river basin, impact levels from 0 (none) to 4 (high) were assigned for each development and for each component based on the impacts anticipated and the estimated value of the site to eagles. Midwinter eagle surveys, aerial photography, topographic and forest stand maps, and site visits were used in the analysis. Impacts were considered additive for all but the disturbance component, which was adjusted for potential synergism between developments. Adjustments were made for mitigation before the impacts were aggregated into a single, dimensionless cumulative impact score. 50 refs., 1 fig., 1 tab.

Witmer, G.W.; O'Neil, T.A.

1988-01-01T23:59:59.000Z

14

GRR/Section 12-FD-b - Bald & Golden Eagle Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 12-FD-b - Bald & Golden Eagle Permit GRR/Section 12-FD-b - Bald & Golden Eagle Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-FD-b - Bald & Golden Eagle Permit 12FDBBaldGoldenEaglePermit.pdf Click to View Fullscreen Contact Agencies Fish and Wildlife Service Bureau of Land Management Regulations & Policies Bald and Golden Eagle Protection Act National Environmental Policy Act Triggers None specified Click "Edit With Form" above to add content 12FDBBaldGoldenEaglePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Bald and Golden Eagle Act prohibits anyone from "taking" bald eagles.

15

Effects of the Cabinet Gorge Kokanee Hatchery on Wintering Bald Eagles in the Lower Clark Fork River and Lake Pend, Oreille, Idaho: 1986 Final Report.  

SciTech Connect

The abundance and distribution of bald eagles (Haliaeetus leucocephalus) on the lower Clark Fork River, Lake Pend Oreille, and the upper Pend Oreille River, Idaho, were documented during the winters of 1985--86 and 1986--87. Peak counts of bald eagles in weekly aerial censuses were higher in 1985--86 (274) and 1986--87 (429) than previously recorded in mid-winter surveys. Differences in eagle distribution within and between years were apparently responses to changes in prey availability. Eight bald eagles were captured and equipped with radio transmitters in the winter and spring of 1986. Residencies within the study area averaged 13.9 days in 1985--86 and 58.3 days for the four eagles that returned in 1986-87. The eagles exhibited considerable daily movement throughout the study area. After departing the area, one eagle was later sighted approximately 1185 km to the southwest in northern California. Eagle behavioral activity was recorded at time budget sessions at areas of heavy use. Perching in live trees was the most common behavior observed. 34 refs., 39 figs., 17 tabs.

Crenshaw, John G.

1987-12-01T23:59:59.000Z

16

Ban of DDT and subsequent recovery of Reproduction in bald eagles  

SciTech Connect

Reproduction of bald eagles in northwestern Ontario declined from 1.26 young per breeding area in 1966 to a low of 0.46 in 1974 and then increased to 1.12 in 1981. Residues of DDE in addled eggs showed a significant inverse relation, confirming the effects of this toxicant on bald eagle reproduction at the population level and the effectiveness of the ban on DDT. The recovery from DDE contamination in bald eagles appears to be occurring much more rapidly than predicted.

Grier, J.W.

1982-12-17T23:59:59.000Z

17

Effects of the Exxon Valdez Oil Spill on bald eagles. Bird study number 4. Exxon Valdez Oil Spill state/federal natural resource damage assessment final report  

Science Conference Proceedings (OSTI)

We estimated that about 8000 bald eagles (Halieetus leucocephalus) inhabited the area affected by the spill at the time of the Exxon Valdez oil spill. We conducted a 3-year study to determine effects of the spill on the bald eagle population and reproduction and survival of adults and fledglings. The greatest injuries to bald eagles occurred in 1989 and were manifested by direct mortality of bald eagles throughout the spill area and significantly reduced reproduction in PWS. We could not discern negative effects on the population or reproduction of eagles after 1989.

Bowman, T.D.; Schempf, P.F.; Bernatowicz, J.A.

1993-12-01T23:59:59.000Z

18

Bald eagle habitat suitability on Melton Hill Reservoir and the Clinch River  

Science Conference Proceedings (OSTI)

The area around Melton Hill Reservoir and sections of the Clinch River along the Oak Ridge Reservation (ORR) provide suitable habitat for bald eagles for both breeding and wintering activities. Primary limitations on habitat suitability appear to be human activity in aquatic habitats and along shoreline areas, and human development along shoreline areas. ORR provides the majority of the suitable habitat because shoreline development is very limited. Four eagle management strategies discussed for ORR include planning development away from high-quality habitats, allowing forest stands near water to mature, conducting timber stand improvement to foster growth and development in pines and hardwoods, and using introductions to foster the development of a breeding population. The primary objective of this project was to make a qualitative assessment of bald eagle habitat suitability along Melton Hill Reservoir and the Clinch River and in adjacent areas on the ORR, including the proposed Advanced Neutron Source site. This survey`s aim was to provide ORR managers with an indication of whether suitable habitat exists and, if so, where it occurs on ORR. This information should provide the basis for incorporating eagle management into the overall ORR land management plan.

Buehler, D.A. [Univ., of Knoxville, TN (United States)

1994-09-01T23:59:59.000Z

19

Eagles and Buzzards  

NLE Websites -- All DOE Office Websites (Extended Search)

The head, neck and tail of the adult is pure white, the body being sooty brown and the wing nearly black. Immature bald eagles, however, until they are three years old and...

20

Animal species of concern reported from the Oak Ridge Reservation...  

NLE Websites -- All DOE Office Websites (Extended Search)

heron NM Egretta thula snowy egret NM Ixobrychus exilis least bittern NM KITES, HAWKS, EAGLES, & allies Haliaeetus leucocephalus bald eagle d NM Circus cyaneus northern harrier NM...

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Animal species of special concern reported from the Oak Ridge...  

NLE Websites -- All DOE Office Websites (Extended Search)

NM Egretta caerulea little blue heron NM Egretta thula snowy egret NM KITES, HAWKS, EAGLES, & allies Haliaeetus leucocephalus bald eagle d NM Circus cyaneus northern harrier NM...

22

Golden Eagles  

NLE Websites -- All DOE Office Websites (Extended Search)

Golden Eagles Name: Karen Location: NA Country: NA Date: NA Question: I am in first grade.Can you please tell me where do golden eagles eat. Replies: Golden eagles are birds of...

23

BIOLOGICAL ASSESSMENT FOR BALD EAGLES FOR LICENSE RENEWAL  

E-Print Network (OSTI)

The Nuclear Regulatory Commission (NRC) is evaluating an application submitted by Virginia Electric and Power Company (VEPCo) for the renewal of the operating licenses for an additional 20 years for its Surry Power Station (SPS), Units 1 and 2. The SPS is located on the Gravel Neck Peninsula in Surry County, Virginia. The current license for Unit 1 will expire on May 25, 2012, and for Unit 2 on January 29, 2013. License renewal will extend the operating license for each unit an additional 20 years past the above dates. The proposed action would include the continued operation and maintenance of the existing facilities at the SPS site and the transmission corridor that connects the SPS, Units 1 and 2, to the regional electrical grid. The proposed action will not include any new construction or onsite disturbance. The NRC is preparing a supplement to its 1996?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for this proposed license renewal. As part of the renewal review, we evaluate potential impacts to Federally listed, proposed, or candidate species, as well as designated or proposed critical habitat. In a letter to the Virginia Field Office of the U.S. Fish and Wildlife Service (FWS) dated January 24, 2002, the NRC staff requested a list of Federally protected species and any critical

John P. Wolflin; U. S. Fish; Wildlife Service

2002-01-01T23:59:59.000Z

24

Baldness  

NLE Websites -- All DOE Office Websites (Extended Search)

is the medical term for loss of hair. Factors involved are heredity, hormones, and aging. Women sometimes have the same type of hair loss in men, but not as severe, and...

25

Bald Mountain Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Bald Mountain Geothermal Project Bald Mountain Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Bald Mountain Geothermal Project Project Location Information Coordinates 40.365833333333°, -120.2425° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.365833333333,"lon":-120.2425,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

A pilot golden eagle population study in the Altamont Pass Wind Resource Area, California  

Science Conference Proceedings (OSTI)

Orloff and Flannery (1992) estimated that several hundred reports are annually killed by turbine collisions, wire strikes, and electrocutions at the Altamont Pass Wind Resource Area (WRA). The most common fatalities were those of red-tailed hawks (Buteo jamaicensis), American kestrels (Falco sparvatius), and golden eagles (Aquila chrysaetos), with lesser numbers of turkey vultures (Cathartes aura), common ravens (Corvus corax), bam owls (Tyto alba), and others. Among the species of raptors killed at Altamont Pass, the one whose local population is most likely to be impacted is the golden eagle. Besides its being less abundant than the others, the breeding and recruitment rates of golden eagles are naturally slow, increasing their susceptibility to decline as a result of mortality influences. The golden eagle is a species afforded special federal protection because of its inclusion within the Bald Eagle Protection Act as amended in 1963. There are no provisions within the Act which would allow the killing ``taking`` of golden eagles by WRA structures. This report details the results of field studies conducted during 19941. The primary purpose of the investigation is to lay the groundwork for determining whether or not turbine strikes and other hazards related to energy at Altamont Pass may be expected to affect golden eagles on a population basis. We also seek an understanding of the physical and biotic circumstances which attract golden eagles to the WRA within the context of the surrounding landscape and the conditions under which they are killed by wind turbines. Such knowledge may suggest turbine-related or habitat modifications that would result in a lower incidence of eagle mortality.

Hunt, G. [California Univ., Santa Cruz, CA (United States). Predatory Bird Research Group

1995-05-01T23:59:59.000Z

27

Photo of the Week: The Eagle Has Landed | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Photo of the Week: The Eagle Has Landed Photo of the Week: The Eagle Has Landed Photo of the Week: The Eagle Has Landed July 3, 2013 - 9:50am Addthis While our National Laboratories and other research centers across the U.S. house some of the nation's most advanced technology and research facilities, the Department of Energy is also working to preserve the wildlife and ecosystems surrounding these locations. This image from 1992 is from another remarkable science and innovation center, NASA’s Kennedy Space Center. This photo is in a series of remarkable shots documenting the daily lives of two of the most famous residents: the southern bald eagles that inhabit an enormous nest on the Kennedy Parkway North. Each fall, eagles take up residence in the nest to breed a new generation. That year, a rare and unique event was captured by a camera hidden in the tree -- a second clutch of eggs was laid, even though a healthy eaglet was born just one month earlier. While it is impossible to determine if it is the same eagles returning each year, the continued tolerance shown by this pair to the human presence seems to indicate that they are the same couple.

28

Common Name Scientific Name Double-crested Cormorant Phalacrocorax auritus  

E-Print Network (OSTI)

Green-winged Teal Anas crecca Hooded Merganser Lophodytes cucullatus Common Merganser Mergus merganser Accipter striatus Cooper's Hawk Accipiter cooperii Northern Harrier Circus cyaneus Broad-winged Hawk Buteo platypterus Red-tailed Hawk Buteo jamaicensis Bald Eagle Haliaeetus leucocephalus American Kestrel Falco

Sharp, Kim

29

Response of wintering bald eagles to industrial construction in southeastern Washington  

Science Conference Proceedings (OSTI)

The Columbia River at the Hanford Site is a regionally important refugium for overwintering birds. Some of the river shoreline has been designated by the U.S. Department of Energy for environmental clean-up following past production of materials for nuclear weapons. We evaluated the effects of soil remediation on winter birds at six inactive nuclear reactor areas. Remediation activities consisted of daily removal of approximately 1,035 t of contaminated soil from previously herbicided and denuded areas located between 30 m and 400 m and in partial line-of-sight of the river shoreline. Remediation activities had no apparent effect on numbers of riverine or terrestrial birds using adjacent undisturbed shoreline and riparian habitat.

Becker, James M.

2002-12-01T23:59:59.000Z

30

Eagle County - Eagle County Efficient Building Code (ECO-Green Build) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eagle County - Eagle County Efficient Building Code (ECO-Green Eagle County - Eagle County Efficient Building Code (ECO-Green Build) Eagle County - Eagle County Efficient Building Code (ECO-Green Build) < Back Eligibility Commercial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Colorado Program Type Building Energy Code Provider Eagle County In an effort to reduce county-wide energy consumption and improve the environment, Eagle County established their own efficient building code (ECO-Green Build) which applies to all new construction and renovations/additions over 50% of the existing floor area of single-family and multifamily residences, and commercial buildings.

31

Code development with the EAGLES engineering problem-solving environment  

Science Conference Proceedings (OSTI)

EAGLES is a set of computer programs which assist in the development and use of engineering analysis and simulation codes. This paper introduces EAGLES to the developers of engineering codes. EAGLES' capabilities, functions, and tools for code development are explained.

Lawver, B.S.; O'Brien, D.W.; Poggio, M.E.

1986-02-07T23:59:59.000Z

32

Assessment of Eagle Ford Shale Oil and Gas Resources.  

E-Print Network (OSTI)

??The Eagle Ford play in south Texas is currently one of the hottest plays in the United States. In 2012, the average Eagle Ford rig (more)

Gong, Xinglai

2013-01-01T23:59:59.000Z

33

Category:Eagle County, CO | Open Energy Information  

Open Energy Info (EERE)

Eagle County, CO Eagle County, CO Jump to: navigation, search Go Back to PV Economics By Location Media in category "Eagle County, CO" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Eagle County CO Public Service Co of Colorado.png SVFullServiceRestauran... 63 KB SVMidriseApartment Eagle County CO Public Service Co of Colorado.png SVMidriseApartment Eag... 67 KB SVQuickServiceRestaurant Eagle County CO Public Service Co of Colorado.png SVQuickServiceRestaura... 63 KB SVSecondarySchool Eagle County CO Public Service Co of Colorado.png SVSecondarySchool Eagl... 68 KB SVStandAloneRetail Eagle County CO Public Service Co of Colorado.png SVStandAloneRetail Eag... 67 KB SVHospital Eagle County CO Public Service Co of Colorado.png SVHospital Eagle Count...

34

Prevention of Golden Eagle electrocution. Final report  

Science Conference Proceedings (OSTI)

Eagle electrocutions on distribution lines were documented in six western states by examination of carcasses found below the lines. Golden eagles represented 82.5% of the 416 carcasses found during the study. Fifty-one of the eagles were fresh enough to determine age and time and cause of death. Of these, 80.6% died of electrocution during the winter months, and only 5.8% of these were adult birds. More eagles were electrocuted in areas of cottontail rabbit habitat than in other areas: 36% of the poles in cottontail rabbit habitat had carcasses under them during the time of the study, 21.9% of the poles with mixed cottontail-jack rabbit habitat had eagle carcasses, and 14% of the poles in jack rabbit-only habitat had eagle carcasses (significant at P = 0.001). Poles placed on topographic salients had more eagle mortalities than poles at low points (P = 0.001). None of the carcasses found had gunshot wounds. Measures found to lower incidence of eagle electrocution inlcude routing lines around preferred prey habitat, locating power poles in topographically low areas, and insulating conductors on corner and transformer poles.

Benson, P.C.

1982-10-01T23:59:59.000Z

35

Eagle Rock Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Eagle Rock Geothermal Facility Eagle Rock Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Eagle Rock Geothermal Facility General Information Name Eagle Rock Geothermal Facility Facility Eagle Rock Sector Geothermal energy Location Information Location The Geysers, California Coordinates 38.826770222484°, -122.80002593994° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.826770222484,"lon":-122.80002593994,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

36

Better Buildings Neighborhood Program: Eagle County, Colorado  

NLE Websites -- All DOE Office Websites (Extended Search)

VA WA | WI Eagle County, Colorado Three Resort Communities in Colorado Get Smart With Energy Upgrades Photo of a ski lodge with snow surrounding it. An image of a map of the...

37

Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Golden Eagle Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG to someone by E-mail Share Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG on Facebook Tweet about Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG on Twitter Bookmark Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG on Google Bookmark Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG on Delicious Rank Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG on Digg Find More places to share Alternative Fuels Data Center: Golden Eagle Distributors Inc. to Convert Entire Fleet to CNG on AddThis.com...

38

Eagle, Alaska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Eagle, AK) Eagle, AK) Jump to: navigation, search Equivalent URI DBpedia Coordinates 64.7880556°, -141.2° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":64.7880556,"lon":-141.2,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

39

Bald Mountain Hot Springs Pool & Spa Low Temperature Geothermal Facility |  

Open Energy Info (EERE)

Bald Mountain Hot Springs Pool & Spa Low Temperature Geothermal Facility Bald Mountain Hot Springs Pool & Spa Low Temperature Geothermal Facility Facility Bald Mountain Hot Springs Sector Geothermal energy Type Pool and Spa Location Ketchum, Idaho Coordinates 43.6807402°, -114.3636619° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

40

EAGLES: An interactive environment for scientific computing  

Science Conference Proceedings (OSTI)

The EAGLES Project is creating a computing system and interactive environment for scientific applications using object-oriented software principles. This software concept leads to well defined data interfaces for integrating experiment control with acquisition and analysis codes. Tools for building object-oriented systems for user interfaces and codes are discussed. Also the terms of object-oriented programming are introduced and later defined in the appendix. These terms include objects, methods, messages, encapsulation and inheritance.

Lawver, B.S.; O'Brien, D.W.; Poggio, M.E.; Shectman, R.M.

1987-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EAGLES: An interactive environment for scientific computing  

Science Conference Proceedings (OSTI)

The EAGLES Project is creating a computing system and interactive environment for scientific applications using object-oriented software principles. This software concept leads to well defined data interfaces for integrating experiments control with acquisition and analysis codes. Tools for building object-oriented systems for user interfaces and codes are discussed. Also the terms of object-oriented programming are introduced and later defined in the appendix. These terms include objects, methods, messages, encapsulation and inheritance.

Lawver, B.S.; O'Brien, D.W.; Poggio, M.E.; Shectman, R.M.

1987-05-11T23:59:59.000Z

42

Geology and Hydrothermal Alteration of the Gold Eagle Deposit: A ...  

Science Conference Proceedings (OSTI)

Recently, there have been many discoveries in the district including the Gold Eagle occurrence, located to the southwest of the old Cochenour-Willans mine...

43

Solasta aka The Eagle Axis | Open Energy Information  

Open Energy Info (EERE)

search Name Solasta (aka The Eagle Axis) Place Newton, Massachusetts Zip 2458 Sector Efficiency, Solar Product Start-up planning to produce high-efficiency solar cells using...

44

,"Eagle Pass, TX Natural Gas Pipeline Exports to Mexico (MMcf...  

U.S. Energy Information Administration (EIA) Indexed Site

Eagle Pass, TX Natural Gas Pipeline Exports to Mexico (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest...

45

DOE/EIS-0342; Wanapa Energy Center Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WILDLIFE SURVEY AND ASSESSMENTS A-1 Biological Assessment for Anadromous Fish Species The following are excerpts from the Biological Assessment conducted by NMFS. Section numbering reflects the format of the original document. 1.4 Analysis Summary The NMFS and USFWS provided a list of threatened, endangered, and proposed candidate species that may occur within the Wanapa Energy Center study area in letters dated July 23, 2003. The list included bald eagle (Haliaeetus leucocephalus), bull trout (Salvelinus confluentus), and seven anadromous fish species. This BA addresses potential impacts on the Pacific salmon and steelhead species. NMFS is responsible for endangered, threatened, and candidate anadromous fish species under NOAA Fisheries' jurisdiction in Oregon. Bull trout and the bald eagle are addressed in a

46

Preventing Voltage Collapse with Protection Systems that Incorporate  

E-Print Network (OSTI)

. Weatherford. 1996. Habits of Bald Eagles wintering along the upper John Day River, Oregon. Northwest Science

47

Eagle County - Solar Energy Rebate Program | Open Energy Information  

Open Energy Info (EERE)

Edit with form History Share this page on Facebook icon Twitter icon Eagle County - Solar Energy Rebate Program This is the approved revision of this page, as well as being...

48

TriEagle Energy, LLC | Open Energy Information  

Open Energy Info (EERE)

Name TriEagle Energy, LLC Place Texas Utility Id 19126 Utility Location Yes Ownership R NERC Location TRE NERC ERCOT Yes Activity Retail Marketing Yes References EIA Form...

49

Eagle Vision : new directions in K-12 GIS.  

E-Print Network (OSTI)

??Eagle Vision is an NSF-funded three-year project that instructs High School teachers working in tribal schools in GIS and GIT, and in GIS-based curriculum design. (more)

Wiley, Cody

2008-01-01T23:59:59.000Z

50

Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Golden Eagle Delivers Golden Eagle Delivers Beer With Natural Gas Trucks to someone by E-mail Share Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas Trucks on Facebook Tweet about Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas Trucks on Twitter Bookmark Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas Trucks on Google Bookmark Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas Trucks on Delicious Rank Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas Trucks on Digg Find More places to share Alternative Fuels Data Center: Golden Eagle Delivers Beer With Natural Gas Trucks on AddThis.com... Aug. 3, 2013 Golden Eagle Delivers Beer With Natural Gas Trucks

51

Suzhou Eagle Electric Vehicle Manufacturing Co Ltd | Open Energy  

Open Energy Info (EERE)

Suzhou Eagle Electric Vehicle Manufacturing Co Ltd Suzhou Eagle Electric Vehicle Manufacturing Co Ltd Jump to: navigation, search Name Suzhou Eagle Electric Vehicle Manufacturing Co Ltd Place Suzhou, China Sector Vehicles Product China-based manufacturer of golf carts, industrial and other 4-wheel electric vehicles. Coordinates 31.3092°, 120.613121° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.3092,"lon":120.613121,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

52

EaglePicher Horizon Batteries LLC | Open Energy Information  

Open Energy Info (EERE)

EaglePicher Horizon Batteries LLC EaglePicher Horizon Batteries LLC Jump to: navigation, search Name EaglePicher Horizon Batteries, LLC Place Dearborn, Michigan Zip MI 48126 Product Joint Venture developing, manufacturing and distributing a breakthrough, high performance sealed lead-acid battery. Coordinates 39.520064°, -94.770486° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.520064,"lon":-94.770486,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

53

Project Eagle Phase 1 Direct Wafer/Cell Solar Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Eagle Phase 1 Direct Wafer/Cell Solar Facility Project Eagle Phase 1 Direct Wafer/Cell Solar Facility 1366 Technologies Description of Proposed Action: The Department of Energy (DOE) proposed action is for the use of a federal loan guarantee by 1366 Technologies (1366) to support the renovation of an existing building, located at 159 Wells Avenue, Newton, Massachusetts, into a solar wafer production facility. The new facility would constitute Phase 1 of Project Eagle and accommodate 20 megawatts (MW) of multi crystalline silicon wafer production, laboratory areas, offices, and ancillary spaces. Phase 2 of Proje~y an existing DOE Categorical Exclusion and would occur at a site in _ _ _ _ . The Phase 1 facility in Newton, MA is an existing building of 50,600 square feet on a site approximately 4.7 acres. 1366 would renovate the interior of the facility to provide office

54

EA-1905: Double Eagle Water System, Carlsbad, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This EA, prepared by the U.S. Department of the Interiors Bureau of Land Management Carlsbad Field Office and adopted by DOE, evaluates the expansion and upgrade of the City of Carlsbads Double Eagle Water System.

55

Microsoft Word - MillerBaldTaftPR_Lines_CX Memo.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2013 4, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Tripp Project Manager - TEP-CSB-1 Proposed Action: Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meterological amd radio towers Location: Mineral and Missoula counties, Montana; Shoshone County, Idaho Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the analog communication system with a new digital communication system at four existing communication sites in Montana and Idaho to enable the connection of the digital circuits and ensure communication reliability. All of the sites are located on land managed by

56

Eagle-Vail, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Eagle-Vail, Colorado: Energy Resources Eagle-Vail, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.618904°, -106.4847619° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.618904,"lon":-106.4847619,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

57

Science Requirements for EAGLE for the E-ELT  

E-Print Network (OSTI)

We present an overview of the EAGLE science case, which spans spatially-resolved spectroscopy of targets from five key science areas - ranging from studies of heavily-obscured Galactic star clusters, right out to the first galaxies at the highest redshifts. Here we summarise the requirements adopted for study and also evaluate the availability of natural guide stars in example fields, which will impact on the adaptive optics performance and architecture.

C. J. Evans; M. D. Lehnert; J. -G. Cuby; S. L. Morris; A. M. Swinbank; W. D. Taylor; D. M. Alexander; N. P. F. Lorente; Y. Clenet; T. Paumard

2008-07-18T23:59:59.000Z

58

ARACOR Eagle-matched Operations and Neutron Detector Performance Tests  

SciTech Connect

A test campaign was undertaken during April 16-19 in LaHonda, California to match the operational performance of the Idaho National Engineering and Environmental Laboratory (INEEL)Varitron accelerator to that of an ARACOR Eagle accelerator. This Eagle-matched condition, with the INEEL Varitron, will be used during a concept demonstration test at Los Alamos National Laboratory (LANL). This operational characterization involved the use of similar electron beam energies, similar production of photoneutrons from selected non-nuclear materials, and similar production of photofissionbased, delayed neutrons from an INEEL-provided, depleted uranium sample. Then using the matched operation, the Varitron was used to define detector performances for several INEEL and LANL detectors using the depleted uranium target and Eagle-like, bremsstrahlung collimation. This summary report provides neutron measurements using the INEEL detectors. All delayed neutron data are acquired in the time interval ranging from 4.95 to 19.9 ms after each accelerator pulse. All prompt neutron data are acquired during 0.156 to 4.91 ms after each accelerator pulse. Prompt and delayed neutron counting acquisition intervals can still be optimized.

Jones, James Litton; Haskell, Kevin James; Hoggan, Jerry Matkin; Norman, Daren Reeve

2002-06-01T23:59:59.000Z

59

Eagle Ford oil and natural gas well starts rose sharply in first ...  

U.S. Energy Information Administration (EIA)

New well starts in the Eagle Ford region in Texas increased 110% from January through March 2012 compared to the same period in 2011, according to reporting and ...

60

Selected Abstracts & Bibliography of International Oil Spill Research, through 1998  

E-Print Network (OSTI)

and bald eagles following the Exxon Valdez oil spill. In:oil, seabirds, eagles, Exxon Valdez, oil spill. Americanshorelines following the Exxon Valdez spill. In: Proceedings

Louisiana Applied Oil Spill Research & Development Program Electronic Bibliography

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

A N N U A L R E P O R T 2 0 0 4 -2 0 0 5 CIRA ANNUAL REPORT FY 04/05  

E-Print Network (OSTI)

for fractal extent, applied to the coastal distribution of bald eagle nests in the Aleutian Islands, Alaska

62

Chattanooga Eagle Ford Rio Grande Embayment Texas- Louisiana-  

U.S. Energy Information Administration (EIA) Indexed Site

Rio Grande Rio Grande Embayment Texas- Louisiana- Mississippi Salt Basin Uinta Basin Appa lachia n Basin Utica Marcellus Devonian (Ohio) Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville Hermosa Mancos Pierre Conasauga Woodford- Caney Pearsall- Eagle Ford Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Maverick Sub-Basin Montana Thrust Belt Marfa Basin Valley and Ridge Province Arkoma Basin Forest City Basin Piceance Basin Shale Gas Plays, Lower 48 States 0 200 400 100 300 Miles ± Source: Energy Information Administration based on data from various published studies

63

ELM-IT: EAGLES Specifications for Italian morphosyntax Lexicon Specification and Classification Guidelines  

Science Conference Proceedings (OSTI)

The aim of the present document is to offer a concrete example of how the EAGLES recommendations for the encoding of morphosyntactic information in lexicons presented in the document by Monachini and Calzolari 1995 are applied to Italian. In particular, ...

Monica Monachini

1996-05-01T23:59:59.000Z

64

Integrating Depositional Facies and Sequence Stratigraphy in Characterizing Unconventional Reservoirs: Eagle Ford Shale, South Texas.  

E-Print Network (OSTI)

?? The Mid-to-Late Cretaceous Eagle Ford Shale of South Texas is a mixed siliciclastic/carbonate, unconventional resource play with considerable oil and natural gas. Characterization of (more)

Workman, Seth Jordan

2013-01-01T23:59:59.000Z

65

City of Eagle River, Wisconsin (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

River, Wisconsin (Utility Company) River, Wisconsin (Utility Company) Jump to: navigation, search Name City of Eagle River Place Wisconsin Utility Id 5551 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Cp-1 Small Power Service between 50kW and 200kW Demand with Parallel Generation(20kW or less)-Net Energy Billing Industrial Cp-1 Small Power Service between 50kW and 200kW Demand Industrial Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW

66

A population study of golden eagles in the Altamont Pass Wind Resource area. Second-year progress report  

Science Conference Proceedings (OSTI)

Since January 1994, the Predatory Bird Research Group, University of California, Santa Cruz, has been conducting a field investigation of the ecology of golden eagles (Aquila chrysaetos) in the vicinity of the Altamont Pass Wind Resource Area (WRA). The 190 km{sup 2} facility lies just east of San Francisco Bay in California and contains about 6,500 wind turbines. Grassland and oak savanna habitats surrounding the WRA support a substantial resident population of golden eagles. Each year, the U.S. Fish and Wildlife Service receivers reports from the wind industry of about 30 golden eagle casualties occurring at the WRA, and it is probable that many more carcasses go unnoticed. Over 90 percent of the casualties are attributed to collisions with wind turbines. The main purpose of this study is to estimate the effect of turbine-related mortality on the golden eagle population of the area. Assessing the impact of the WRA kills on the population requires quantification of both survival and reproduction. To estimate survival rates of both territorial and non-territorial golden eagles, we tagged 179 individuals with radio-telemetry transmitters expected to function for about four years and equipped with mortality sensors. Population segments represented in the tagged sample include 79 juveniles, 45 subadults, 17n floaters (non-territorial adults), and 38 breeders. Effective sample sizes in the older segments increase as younger eagles mature or become territorial. Since the beginning of the study, we have conducted weekly roll-call surveys by airplane to locate the tagged eagles in relation to the WRA and to monitor their survival. The surveyed area extends from the Oakland Hills southeast through the Diablo Mountain Range to San Luis Reservoir about 75 km southeast of the WRA. The surveys show that breeding eagles rarely enter the WRA while the non-territorial eagles tend to move about freely throughout the study area and often visit the WRA.

NONE

1997-07-01T23:59:59.000Z

67

CO2 Storage and Enhanced Oil Recovery: Bald Unit Test Site, Mumford Hills Oil Field, Posey County, Indiana  

SciTech Connect

The Midwest Geological Sequestration Consortium (MGSC) carried out a small-scale carbon dioxide (CO2) injection test in a sandstone within the Clore Formation (Mississippian System, Chesterian Series) in order to gauge the large-scale CO2 storage that might be realized from enhanced oil recovery (EOR) of mature Illinois Basin oil fields via miscible liquid CO2 flooding. As part of the MGSC???????¢????????????????s Validation Phase (Phase II) studies, the small injection pilot test was conducted at the Bald Unit site within the Mumford Hills Field in Posey County, southwestern Indiana, which was chosen for the project on the basis of site infrastructure and reservoir conditions. Geologic data on the target formation were extensive. Core analyses, porosity and permeability data, and geophysical logs from 40 wells were used to construct cross sections and structure contour and isopach maps in order to characterize and define the reservoir architecture of the target formation. A geocellular model of the reservoir was constructed to improve understanding of CO2 behavior in the subsurface. At the time of site selection, the Field was under secondary recovery through edge-water injection, but the wells selected for the pilot in the Bald Unit had been temporarily shut-in for several years. The most recently shut-in production well, which was surrounded by four nearby shut-in production wells in a five-spot pattern, was converted to CO2 injection for this pilot. Two additional wells outside the immediate five-spot pattern, one of which was an active producer, were instrumented to measure surface temperature and pressure. The CO2 injection period lasted from September 3, 2009, through December 14, 2010, with one three-month interruption caused by cessation of CO2 deliveries due to winter weather. Water was injected into the CO2 injection well during this period. A total of 6,300 tonnes (6,950 tons) of CO2 were injected into the reservoir at rates that generally ranged from 18 to 32 tonnes (20 to 35 tons) per day. The CO2 injection bottomhole pressure generally remained at 8.3 to 9.0 MPag (1,200 to 1,300 psig). The CO2 injection was followed by continued monitoring for nine months during post-CO2 water injection. A monitoring, verification, and accounting (MVA) program was designed to determine the fate of injected CO2. Extensive periodic sampling and analysis of brine, groundwater, and produced gases began before CO2 injection and continued through the monitored waterflood periods. Samples were gathered from production wells and three newly installed groundwater monitoring wells. Samples underwent geochemical and isotopic analyses to reveal any CO2-related changes. Groundwater and kinetic modeling and mineralogical analysis were also employed to better understand the long-term dynamics of CO2 in the reservoir. No CO2 leakage into groundwater was detected, and analysis of brine and gas chemistry made it possible to track the path of plume migration and infer geochemical reactions and trapping of CO2. Cased-hole logging did not detect any CO2 in the near-wellbore region. An increase in CO2 concentration was first detected in February 2010 from the gas present in the carboy during brine sampling; however, there was no appreciable gas volume associated with the detection of CO2. The first indication of elevated gas rates from the commingled gas of the pilot???????¢????????????????s production wells occurred in July 2010 and reached a maximum of 0.36 tonnes/day (0.41 tons/day) in September 2010. An estimated 27 tonnes (30 tons) of CO2 were produced at the surface from the gas separator at the tank battery from September 3, 2009, through September 11, 2011, representing 0.5% of the injected CO2. Consequently, 99.5%

Frailey, Scott M.; Krapac, Ivan G.; Damico, James R.; Okwen, Roland T.; McKaskle, Ray W.

2012-03-30T23:59:59.000Z

68

Bald Face Hornets  

NLE Websites -- All DOE Office Websites (Extended Search)

said he has a nest where he works that is active all year. I have two small children & a dog who play in the yard where this nest is will this nest be OK until after the first...

69

A Population Study of Golden Eagles in the Altamont Pass Wind Resource Area: Population Trend Analysis, 1994-1997  

SciTech Connect

The wind industry has annually reported 28-43 turbine blade strike casualties of golden eagles in the Altamont Pass Wind Resource Area, and many more carcasses have doubtless gone unnoticed. Because this species is especially sensitive to adult survival rate changes, we focused upon estimating the demographic trend of the population. In aerial surveys, we monitored survival within a sample of 179 radio-tagged eagles over a four-year period. We also obtained data on territory occupancy and reproduction of about 65 eagle pairs residing in the area. Of 61 recorded deaths of radio-tagged eagles during the four-year investigation, 23 (38%) were caused by wind turbine blade strikes. Additional fatalities were unrecorded because blade strikes sometimes destroy radio transmitters. Annual survival was estimated at 0.7867 (SE=0.0263) for non-territorial eagles and 0.8964 (SE=0.0371) for territorial ones. Annual reproduction was 0.64 (SE=0.08) young per territorial pair (0.25 per female). These parameters were used to estimate population growth rates under different modeling frameworks. At present, there are indications that a reserve of non-breeding adults still exists, i.e., there is an annual territorial reoccupancy rate of 100% and a low incidence (3%) of subadults as members of breeding pairs.

Predatory Bird Research Group, Long Marine Laboratory

1999-07-20T23:59:59.000Z

70

2,3,7,8-tetrachlorodibenzo-p-dioxin equivalents in extracts of Baltic white-tailed sea eagles  

SciTech Connect

Concentrations of 2,3,7,8-tetrachlorodibenzo-p-dioxin-(TCDD) equivalents were measured in extracts of Baltic white-tailed sea eagle tissues. Extracts of salmon, ringed seal, and grey seal were analyzed as other predatory species of the same area. Concentrations in eagle and seal tissues were greater than those in salmon. Concentrations of TCDD equivalents (TCDD-EQs) determined by the H4IIE bioassay were compared with toxic equivalents (TEQs) derived from instrumental chemical analyses in fractions containing polychlorinated dibenzo-P-dioxins and polychlorinated dibenzofurans (PCDD/PCDF) or coplanar polychlorinated biphenyls (PCBs). Toxic equivalents were calculated by use of an additive model in which the product of the concentrations of instrumentally measured individual congeners were multiplied by their TCDD equivalency factors and were summed to give a total concentration of TEQs. The TCDD-EQs were compared with TEQs to develop a mass balance to determine whether all the TCDD-like activity was accounted for. The TEQs determined by chemical analyses for coplanar PCBs was 770 pg/g fw, and that of PCDD/PCDFs was 270 pg/g fw in this eagle. Thus, concentrations of TCDD-EQs were approx. 20% greater than those of TEQs. The true difference in activities is probably greater because of lower recoveries and infra-additivities among congeners in the bioassay. This indicates that there are compounds present in the extracts that can contribute to the total concentrations of TCDD-EQs in white-tailed sea eagle eggs to the no-observable-adverse-effect concentration, ranged from 7.3 to 141. This indicates that current concentrations of TCDD-EQs in these eggs are likely causing adverse effects in the Baltic populations of white-tailed sea eagles. This study indicated that the H4IIE bioassay is useful for monitoring the presence and biological activity of TCDD-like compounds in environmental samples like white-tailed sea eagles.

Koistinen, J.; Giesy, J.P. [Michigan State Univ., East Lansing, MI (United States); Koivusaari, J. [Western Finland Regional Environment Centre, Vaasa (Finland); Nuuja, I. [Milieu-Data Cc, Jyvaeskylae (Finland); Vuorinen, P.J. [Finnish Game and Fisheries Research Inst., Helsinki (Finland); Paasivirta, J. [Univ. of Jyvaeskylae (Finland). Dept. of Chemistry

1997-07-01T23:59:59.000Z

71

Assessment of the Mexican Eagle Ford Shale Oil and Gas Resources  

E-Print Network (OSTI)

According to the 2011 Energy Information Agency (EIA) global assessment, Mexico ranks 4th in shale gas resources. The Eagle Ford shale is the formation with the greatest expectation in Mexico given the success it has had in the US and its liquids-rich zone. Accurate estimation of the resource size and future production, as well as the uncertainties associated with them, is critical for the decision-making process of developing shale oil and gas resources. The complexity of the shale reservoirs and high variability in its properties generate large uncertainties in the long-term production and recovery factors of these plays. Another source of uncertainty is the limited production history. Given all these uncertainties, a probabilistic decline-curve analysis approach was chosen for this study, given that it is relatively simple, it enables performing a play-wide assessment with available production data and, more importantly, it quantifies the uncertainty in the resource size. Analog areas in the US Eagle Ford shale were defined based on available geologic information in both the US and Mexico. The Duong model coupled with a Markov Chain Monte Carlo (MCMC) methodology was used to analyze and forecast production of wells located in the previously defined analog sectors in the US Eagle Ford shale. By combining the results of individual-well analyses, a type curve and estimated ultimate recovery (EUR) distribution for each of the defined analog sectors was obtained. These distributions were combined with well-spacing assumptions and sector areas to generate the prospective-resources estimates. Similar probabilistic decline-curve-analysis methodology was used to estimate the reserves and contingent resources of existing wells. As of March 2013, the total prospective resources (P90-P50-P10) for the Eagle Ford shale in Mexico (MX-EFS) are estimated to be 527-1,139-7,268 MMSTB of oil and 17- 37-217 TSCF of gas. To my knowledge, this is the first oil estimate published for this formation in Mexico. The most attractive sectors based on total estimated resources as well as individual-well type curves are located in the southeast of the Burgos Basin and east-west of the Sabinas basin. Because there has been very little development to date, estimates for reserves and contingent resources are much lower than those for prospective resources. Estimated reserves associated with existing wells and corresponding offset well locations are 18,375-34,722-59,667 MMSCF for gas and zero for oil. Estimated contingent resources are 14-64-228 MSTB of oil and 8,526-13,327- 25,983MMSCF of gas. The results of this work should provide a more reliable assessment of the size and uncertainties of the resources in the Mexican Eagle Ford shale than previous estimates obtained with less objective methodologies.

Morales Velasco, Carlos Armando

2013-08-01T23:59:59.000Z

72

EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

73

Award Recipient of ENERGY STAR Challenge for Industry JM Eagle Stockton C4I Plant Profile  

NLE Websites -- All DOE Office Websites (Extended Search)

Stockton Plastic Pipe Manufacturing Plant Stockton Plastic Pipe Manufacturing Plant JM Eagle 1051 Sperry Road Stockton, CA 95206 The Stockton Plastic Pipe Manufacturing Plant opened in 1957. Until 1987, the plant made asbestos and cement pipe, and by 1972 the plant made the conversion to PVC pipe in a wide range of sizes and uses. Recent upgrades have added HTPE and corrugated manufacturing capacity. The Stockton plant achieved the ENERGY STAR Challenge for Industry in September 2010. This plant achieved a 12.6% energy intensity reduction in the first year following its baseline. The success of achieving the Challenge for Industry came principally from empowering employees at Green Team meetings to look for and implement energy conservation and environmental responsibility improvements, initially focused on repairing air leaks from the

74

Award Recipient of ENERGY STAR Challenge for Industry JM Eagle Wharton Plastic Pipe Manufacturing Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Wharton Plastic Pipe Manufacturing Plant JM Eagle 10807 U.S. 59 Road Wharton, TX 77488 The Wharton Plastic Pipe Manufacturing Plant, located on an old cattle field, opened in 1985 by first manufacturing PVC pipe. The manufacturing of injection molding was added in 1988, corrugated pipe was added in 2009, and corrugated fittings were added in 2011. There are expectations for the plant to expand into manufacturing PE pipe fittings in the future. The Wharton plant achieved the ENERGY STAR Challenge for Industry in June 2010. The plant achieved a 15.5% reduction in energy intensity in the first year following its baseline. The success of achieving the Challenge for Industry came principally from an energy conservation program that focused on not operating equipment other than that needed for current production,

75

EAGLES 1.1: A microcomputer software package for analyzing fuel efficiency of electric and gasoline vehicles  

SciTech Connect

As part of the U.S. Department of Energy`s electric/hybrid vehicle research program, Argonne National Laboratory has developed a computer software package called EAGLES. This paper describes the capability of the software and its many features and potential applications. EAGLES version 1.1 is an interactive microcomputer software package for the analysis of battery performance in electric-vehicle applications, or the estimation of fuel economy for a gasoline vehicle. The principal objective of the electric-vehicle analysis is to enable the prediction of electric-vehicle performance (e.g., vehicle range) on the basis of laboratory test data for batteries. The model provides a second-by-second simulation of battery voltage and current for any specified velocity/time or power/time profile, taking into consideration the effects of battery depth-of-discharge and regenerative braking. Alternatively, the software package can be used to determine the size of the battery needed to satisfy given vehicle mission requirements (e.g., range and driving patterns). For gasoline-vehicle analysis, an empirical model relating fuel economy, vehicle parameters, and driving-cycle characteristics is included in the software package. For both types of vehicles, effects of heating/cooling loads on vehicle performance can be simulated. The software package includes many default data sets for vehicles, driving cycles, and battery technologies. EAGLES 1.1 is written in the FORTRAN language for use on IBM-compatible microcomputers.

Marr, W.M.

1994-05-15T23:59:59.000Z

76

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment  

Science Conference Proceedings (OSTI)

Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.

Not Available

1993-02-05T23:59:59.000Z

77

Birds  

NLE Websites -- All DOE Office Websites (Extended Search)

that use these areas include anhingas, great egrets, little blue herons, and bald eagles. A few species, including wood ducks, mallards, and great blue herons, are year-round...

78

Fermilab Today  

NLE Websites -- All DOE Office Websites (Extended Search)

of which may be the future tenant of the Nepese Marsh platform. There are also bald eagles nesting on Randall Road in Batavia, which is a short flight. Perhaps, if the nesting...

79

Fermilab Today  

NLE Websites -- All DOE Office Websites (Extended Search)

is not doom and gloom, though. Several predatory birds, such as Cooper's hawks, bald eagles, peregrine falcons and ospreys, seem to be making a comeback at Fermilab. This is...

80

Assessment of the geothermal resources of Carson-Eagle valleys and Big Smoky Valley, Nevada. First annual report, May 1, 1979-May 30, 1980  

DOE Green Energy (OSTI)

Two geothermal investigations were completed in three Nevada locations. The regions studied were selected from areas outlined as having direct utilization potential (Trexler and others, 1979) and included the Carson-Eagle Valley, Bis Smoky Valley and Caliente. Studies were organized around the completion of a group of tasks in each area. These tasks included: geologic reconnaissance, gravity surveys, aerial photography, fluid sampling and analysis, shallow depth temperature probe surveys, soil mercury surveys, shallow electrical resistivity measurements, and temperature gradient hole drilling. Goals of the project were to provide regional information about the nature and extent of the resources and to offer a critical evaluation of the techniques employed. Results from the work in the Carson-Eagle Valley and Big Smoky Valley are presented. (MHR)

Trexler, D.T.; Koenig, B.A.; Flynn, T.; Bruce, J.L.

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

On Eagle's Wings - CECM  

E-Print Network (OSTI)

The snare of the fowler will never capture you and famine will bring you no fear: under his wings your refuge, his faithfulness your shield. And he will raise you...

82

User`s guide to EAGLES Version 1.1: An electric- and gasoline-vehicle fuel-efficiency software package  

DOE Green Energy (OSTI)

EAGLES is an interactive microcomputer software package for the analysis of fuel efficiency in electric-vehicle (EV) applications or the estimation of fuel economy for a gasoline vehicle. The principal objective of the EV analysis is to enable the prediction of EV performance on the basis of laboratory test data for batteries. The EV model included in the software package provides a second-by-second simulation of battery voltage and current for any specified vehicle velocity/time or power/time profile. The capability of the battery is modeled by an algorithm that relates the battery voltage to the withdrawn (or charged) current, taking into account the effect of battery depth-of-discharge. Alternatively, the software package can be used to determine the size of the battery needed to satisfy given vehicle mission requirements. For gasoline vehicles, a generic fuel-economy model based on data from EPA Test Car List 1991 is included in the software package. For both types of vehicles, effects of heating/cooling loads on vehicle performance, including range penalty for EVs, can be studied. Also available is an option to estimate the time needed by a specified vehicle to reach a certain speed with the application of a constant power and an option to compute the fraction of time and/or distance in a driving cycle at speeds exceeding a specified value. Certain parameters can be changed interactively prior to a run.

Marr, W.W.

1995-01-01T23:59:59.000Z

83

Response of Red-Tailed Hawks and Golden Eagles to Topographical Features, Weather, and Abundance of a Dominant Prey Species at the Altamont Pass Wind Resource Area, California: April 1999-December 2000  

SciTech Connect

Studies have shown that raptors flying within the Altamont Pass WRA are vulnerable to fatal turbine collisions, possibly because of their specific foraging and flight behavior. Between June 1999 and June 2000, I conducted 346.5 hours of raptor observations within the Atlamont Pass WRA. Behavior was recorded in relation to characteristics of the topography (slope aspect, elevation, and inclination), the weather, and ground squirrel abundance, as determined by active burrow entrances. The most significant finding of this study revealed that red-tailed hawks and golden eagles flew more in strong winds than in weak winds, particularly along hillsides facing into prevailing winds (as opposed to hillsides shielded from the wind). This is likely a result of the birds' use of declivity currents for lift during flights. These results suggest that certain combinations of topography and weather produce wind currents that are sought out by foraging red-tailed hawks and golden eagles within the Altamont Pass WRA. To decrease raptor mortality, mitigation measures can be targeted to specific areas likely to attract foraging raptors because of their capacity to create particularly favorable wind currents.

Hoover, S.

2002-06-01T23:59:59.000Z

84

Eagles nest performs for skiers  

Science Conference Proceedings (OSTI)

The building named Niu de l'Aliga, located in the Pyrenees at an altitude of 2530 meters, has performed satisfactorily since its completion in the summer of 1985. During the cold and dry winter months, this restaurant and refuge has enjoyed hot and cold running water and constant electrical supply, as well as an acceptable indoor temperature. And all this has been achieved using only the natural resources of sun, wind and snow or rain. The performance of that shelter is discussed.

Not Available

1987-01-01T23:59:59.000Z

85

Wildlife studies on the Hanford Site: 1993 Highlights report  

Science Conference Proceedings (OSTI)

The Pacific Northwest Laboratory (PNL) Wildlife Resources Monitoring Project was initiated by DOE to track the status of wildlife populations to determine whether Hanford operations affected them. The project continues to conduct a census of wildlife populations that are highly visible, economically or aesthetically important, and rare or otherwise considered sensitive. Examples of long-term data collected and maintained through the Wildlife Resources Monitoring Project include annual goose nesting surveys conducted on islands in the Hanford Reach, wintering bald eagle surveys, and fall Chinook salmon redd (nest) surveys. The report highlights activities related to salmon and mollusks on the Hanford Reach of the Columbia River; describes efforts to map vegetation on the Site and efforts to survey species of concern; provides descriptions of shrub-steppe bird surveys, including bald eagles, Canada geese, and hawks; outlines efforts to monitor mule deer and elk populations on the Site; and describes development of a biological database management system.

Cadwell, L.L. [ed.

1994-04-01T23:59:59.000Z

86

Habitat Evaluation Procedures (HEP) Report : Priest River, 2004-2005 Technical Report.  

DOE Green Energy (OSTI)

On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 105.41 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 26.95 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland habitat provides 23.78 HUs for Canada goose and mallard. Scmb-shrub vegetation provides 54.68 HUs for mallard, yellow warbler, and white-tailed deer.

Entz, Ray

2005-02-01T23:59:59.000Z

87

Eagle Energy LLC | Open Energy Information  

Open Energy Info (EERE)

Energy LLC Energy LLC Place Cincinnati, Ohio Zip 45211 - 4439 Product Holding company of Front Range Energy. Coordinates 39.106614°, -84.504552° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.106614,"lon":-84.504552,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

88

Eagle, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

552634°, -106.8286507° 552634°, -106.8286507° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.6552634,"lon":-106.8286507,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

89

Eagle, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

94563°, -88.474265° 94563°, -88.474265° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8794563,"lon":-88.474265,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

90

Eagle, Alaska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

880556°, -141.2° 880556°, -141.2° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":64.7880556,"lon":-141.2,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

91

Eagle, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Idaho: Energy Resources Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.6954424°, -116.3540138° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.6954424,"lon":-116.3540138,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

92

Wildlife Protection, Mitigation, and Enhancement Planning, Dworshak Reservoir : Final Report FY 1987.  

SciTech Connect

The impact to wildlife and habitat losses due to the construction and operation of Dworshak Dam on bald eagles and osprey were investigated for the 54 miles of the North Fork Clearwater River that was inundated by Dworshak Reservoir. Down stream impacts, and habitat losses due to Dworshak Dam were investigated for all target wildlife species that utilize the riparian area along the 42.5 miles of North Fork and lower Clearwater Rivers from the dam site to the confluence with the Snake River. The investigation was restricted to existing information. Changing the riverine habitat along the North Fork Clearwater River to one with unique reservoir characteristics has changed the ability of the North Fork Drainage to support past and present wildlife species that inhabited the area. The historical breeding grounds of bald eagles were reduced by increased human activities facilitated by the open access to Dworshak Reservoir and the permanent loss of historical salmon runs up the North Fork Clearwater River. The permanent loss of historical anadromous fish runs have had a negative impact on wintering eagles. The introduction of kokanee, however, has provided a replacement prey base, but only if the fishery is stable and reliable. 47 refs., 10 figs., 5 tabs.

Kronemann, Loren A.; Lawrence, Keith P.

1988-01-01T23:59:59.000Z

93

Habitat Evaluation Procedures (HEP) Report; Carey Creek, Technical Report 2005.  

DOE Green Energy (OSTI)

In August 2002, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Carey Creek property, an acquisition completed by the Kalispel Tribe of Indians in December 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Carey Creek Project provides a total of 172.95 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 4.91 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Forested wetlands provide 52.68 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub wetlands provide 2.82 HUs for mallard, yellow warbler and white-tailed deer. Wet meadow and grassland meadow provide 98.13 HUs for mallard and Canada goose. Emergent wetlands provide 11.53 HUs for mallard, muskrat, and Canada goose. Open water provides 2.88 HUs for Canada goose, mallard, and muskrat. The objective of using HEP at the Carey Creek Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-05-01T23:59:59.000Z

94

Habitat Evaluation Procedures (HEP) Report; Beaver Lake, Technical Report 2005.  

DOE Green Energy (OSTI)

On August 14, 2003, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in November 2002. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Beaver Lake Project provides a total of 232.26 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 136.58 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Forested wetland habitat provides 20.02 HUs for bald eagle, black-caped chickadee, mallard, and white-tailed deer. Scrub-shrub wetland habitat provides 7.67 HUs for mallard, yellow warbler, and white-tailed deer. Grassland meadow provides 22.69 HUs for Canada goose and mallard. Emergent wetlands provide 35.04 HUs for Canada goose, mallard, and muskrat. Open water provided 10.26 HUs for Canada goose, mallard, and muskrat. The objective of using HEP at the Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-05-01T23:59:59.000Z

95

Habitat Evaluation Procedures (HEP) Report; Tacoma Creek South Project, Technical Report 2003-2005.  

DOE Green Energy (OSTI)

On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Tacoma Creek South property, an acquisition completed by the Kalispel Tribe of Indians in June 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Tacoma Creek South Project provides a total of 190.79 Habitat Units (HUs) for the species evaluated. Emergent wetlands provide 20.51 HUs for Canada goose, mallard, and muskrat. Grassland provides 1.65 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 11.76 HUs for mallard, yellow warbler, and white-tailed deer. Conifer forest habitat provides 139.92 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Deciduous forest also provides 19.15 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the Tacoma Creek South Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-02-01T23:59:59.000Z

96

Habitat Evaluation Procedures (HEP) Report, Pend Oreille Wetlands Wildlife II Project, Technical Report 2002.  

DOE Green Energy (OSTI)

In 2002, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Pend Oreille Wetlands Wildlife II Project, an acquisition completed by the Kalispel Tribe of Indians in 1997. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, and yellow warbler. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Pend Oreille Wetlands Wildlife II Project provides a total of 313.91 Habitat Units (HUs) for the species evaluated. Open water habitat provides 16.08 HUs for Canada goose and mallard. Shoreline and island habitat provide 7.36 HUs fore Canada goose and mallard. Wet meadow provides 117.62 HUs for Canada goose and mallard. Scrub-shrub wetlands provide 9.78 HUs for yellow warbler, mallard, and white-tailed deer. Deciduous forested wetlands provide 140.47 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Conifer forest provides 22.60 HUs for bald eagle, black-capped chickadee, and white-tailed deer. The objective of using HEP at the Pend Oreille Wetlands Wildlife II Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Holmes, Darren

2003-06-01T23:59:59.000Z

97

Habitat Evaluation Procedures (HEP) Report; Gamblin Lake, Technical Report 2005.  

DOE Green Energy (OSTI)

On August 12, 2003, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Gamblin Lake property, an acquisition completed by the Kalispel Tribe of Indians in December 2002. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Gamblin Lake Project provides a total of 273.28 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 127.92 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Forested wetland habitat provides 21.06 HUs for bald eagle, black-caped chickadee, mallard, and white-tailed deer. Wet meadow provides 78.05 HUs for Canada goose and mallard. Emergent wetland habitat provides 46.25 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the Gamblin Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-05-01T23:59:59.000Z

98

Habitat Evaluation Procedures (HEP) Report; North Eaton Lake, Technical Report 2005.  

DOE Green Energy (OSTI)

On July 6, 2005, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the North Eaton Lake property, an acquisition completed by the Kalispel Tribe of Indians in November 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The North Eaton Lake Project provides a total of 235.05 Habitat Units (HUs) for the species evaluated. Open water habitat provides 9.38 HUs for Canada goose, mallard and muskrat. Emergent wetland habitat provides 11.36 HUs for Canada goose, mallard and muskrat. Forested wetland provides 10.97 HUs for bald eagle, black-capped chickadee, mallard and white-tailed deer. Conifer forest habitat provides 203.34 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the North Eaton Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-11-01T23:59:59.000Z

99

Eagle Nest, New Mexico: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Nest, New Mexico: Energy Resources Nest, New Mexico: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.4383653°, -107.3244921° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.4383653,"lon":-107.3244921,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

100

Eagle Mountain, Utah: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

3141169°, -112.006882° 3141169°, -112.006882° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.3141169,"lon":-112.006882,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

East Wind Events at Double Eagle II Airport  

E-Print Network (OSTI)

East canyon wind events are notorious for their strength and sudden onset in New Mexicos Rio Grande Valley. Locations below canyons opening into the valley from the east commonly experience surface winds at speeds from 15 to 25 mph with gusts around 35 mph during east canyon wind events, and these gap winds can be much stronger depending on the strength of the

David L. Craft

2008-01-01T23:59:59.000Z

102

Eagle Pass, TX Natural Gas Exports to Mexico  

U.S. Energy Information Administration (EIA)

U.S. Natural Gas Exports by Point of Exit (Volumes in Million Cubic Ft., Prices in Dollars per Thousand Cubic Ft.)

103

Award Recipient of ENERGY STAR Challenge for Industry JM Eagle...  

NLE Websites -- All DOE Office Websites (Extended Search)

STAR Challenge for Industry in June 2010. The plant achieved a 15.5% reduction in energy intensity in the first year following its baseline. The success of achieving the Challenge...

104

Award Recipient of ENERGY STAR Challenge for Industry JM Eagle...  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Challenge for Industry in September 2010. This plant achieved a 12.6% energy intensity reduction in the first year following its baseline. The success of achieving the...

105

Trends in Eagle Ford drilling highlight the search for oil ...  

U.S. Energy Information Administration (EIA)

Crude oil, gasoline, heating oil, diesel, propane, ... In major shale plays, drilling activity depends largely on the resource mix and relative fuel ...

106

Eagle Point, Oregon: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Point, Oregon: Energy Resources Point, Oregon: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.4726258°, -122.8028177° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.4726258,"lon":-122.8028177,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

107

Eagle County, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

9.576406°, -106.7234639° 9.576406°, -106.7234639° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.576406,"lon":-106.7234639,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

108

Microsoft Word - Wireless - Eagle Junction CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Description of the Proposed Action: The proposed project includes construction and operation of Clearwire wireless facilities on the Chemawa-Salem 1 & 2 transmission line,...

109

Habitat Evaluation Procedures (HEP) Report : West Beaver Lake, 2004-2005 Technical Report.  

DOE Green Energy (OSTI)

On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 103.08 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 7.17 HUs for mallard and muskrat. Conifer forest habitat provides 95.91 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-02-01T23:59:59.000Z

110

Ecological baseline study of the Yakima Firing Center proposed land acquisition: A Preliminary Report  

Science Conference Proceedings (OSTI)

A baseline census was conducted from October 1987 to Janurary 1988 on the property identified for possible expansion of the Yakima Firing Center. These studies provide general descriptions of the major plant communities presentand animal inhabitants during the late fall and winter study period. A vegetation map derived from a combination of onsite surveillance and remotely sensed imagery is also provided as part of this report. Through January 1988, 13 wildlife species of special interest to state and federal agencies, in addition to ducks and geese, were observed on the proposed expansion area. Then raptorial bird species were observed in the area, including bald eagles, golden eagles, and prairie falcons. Upland game bird species, such as sage grouse, California quail, chuckars, and gray (Hungarian) partridge were present. Loggerhead shrikes, a species of special interest, were also observed on the site. Estimates of waterfowl abundance are included for the Priest Rapids Pool of the Columbia River, which includes the proposed river crossing sites. The number of waterfowl on the proposed crossing areas were comparatively low during the winter of 1986 to 1987 and high in 1987 to 1988. Bald eagles ad common loons were observed on the crossing areas. Six small mammal species were captured during this study period;one, the sagebrush vole, is a species of special interest. Two large animal species, mule deer and elk, were noted on the site. Beaver were the only furbearig animals noted to date. Rainbow trout were the only fish species collected within the proposed northern expansion area. The distribution of fall chinook salmon spawning areas was documented within the proposed river crossing areas. 3 refs., 7 figs., 3 tabs.

Rogers, L.E.; Beedlow, P.A.; Eberhardt, L.E.; Dauble, D.D.; Fitzner, R.E.

1988-02-01T23:59:59.000Z

111

Habitat Evaluation Procedures (HEP) Report, Pend Oreille Wetlands Wildlife I Project, Technical Report 2002.  

DOE Green Energy (OSTI)

In 2002, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Pend Oreille Wetlands Wildlife Project, an acquisition completed by the Kalispel Tribe of Indians in 1992. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, and yellow warbler. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Pend Oreille Wetlands Wildlife Project provides a total of 936.76 Habitat Units (HUs) for the species evaluated. Open water habitat provides 71.92 HUs for Canada goose, mallard, and muskrat. Shoreline and island habitat provide 12.77 HUs fore Canada goose and mallard. Cattail hemi-marsh provides 308.42 HUs for Canada goose, mallard, and muskrat. Wet meadow provides 208.95 HUs for Canada goose and mallard. Scrub-shrub wetlands provide 14.43 HUs for yellow warbler, mallard, and white-tailed deer. Deciduous forested wetlands provide 148.62 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Grassland meadow provides 3.38 HUs for Canada goose. Conifer forest provides 160.44 HUs for bald eagle, black-capped chickadee, and white-tailed deer. The objective of using HEP at the Pend Oreille Wetlands Wildlife Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Holmes, Darren

2003-05-01T23:59:59.000Z

112

EO 13186: Responsibilities of Federal Agencies To Protect Migratory Birds  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

853 853 Federal Register Vol. 66, No. 11 Wednesday, January 17, 2001 Title 3- The President Executive Order 13186 of January 10, 2001 Responsibilities of Federal Agencies To Protect Migratory Birds By the authority vested in me as President by the Constitution and the laws of the United States of America, and in furtherance of the purposes of the migratory bird conventions, the Migratory Bird Treaty Act (16 U.S.C. 703-711), the Bald and Golden Eagle Protection Acts (16 U.S.C. 668-668d), the Fish and Wildlife Coordination Act (16 U.S.C. 661-666c), the Endangered Species Act of 1973 (16 U.S.C. 1531-1544), the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4347), and other pertinent statutes, it is hereby ordered as follows: Section 1. Policy. Migratory birds are of great ecological and economic

113

GRR/Section 12 - Flora & Fauna Resource Assessment Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 12 - Flora & Fauna Resource Assessment Process GRR/Section 12 - Flora & Fauna Resource Assessment Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12 - Flora & Fauna Resource Assessment Process 12 - FloraFaunaResourceAssessmentProcess.pdf Click to View Fullscreen Contact Agencies Fish and Wildlife Service US Army Corps of Engineers Bureau of Land Management Regulations & Policies Bald and Golden Eagle Protection Act Marine Mammal Protection Act Migratory Bird Treaty Act Endangered Species Act State species protection acts Triggers None specified Click "Edit With Form" above to add content 12 - FloraFaunaResourceAssessmentProcess.pdf 12 - FloraFaunaResourceAssessmentProcess.pdf Error creating thumbnail: Page number not in range.

114

Sensitive Species  

NLE Websites -- All DOE Office Websites (Extended Search)

Sensitive Species Sensitive Species Sensitive Species By avoiding or minimizing the impact of Laboratory activities on sensitive species, LANL can potentially reduce the possibility of these species being upgraded to federal protection. April 12, 2012 sensitive species The bald eagle is one of our sensitive species. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Sensitive species are plants and animals that are protected at the state or local level. Keeping sensitive species safe We strive to minimize the impact of Laboratory operations on sensitive species, which are plants and animals not protected by the federal Endangered Species Act or the Migratory Bird Treaty Act, but are protected on state or local levels.

115

Microsoft Word - Final Enivornmental Assessment.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment OF THE UNIVERSITY OF DELAWARE LEWES CAMPUS ONSITE WIND ENERGY PROJECT U.S. Department of Energy Office of Energy Efficiency and Renewable Energy DECEMBER 2010 DOE/EA-1782 FINAL ENVIRONMENTAL ASSESSMENT OF THE UNIVERSITY OF DELAWARE LEWES CAMPUS ONSITE WIND ENERGY PROJECT U.S. Department of Energy Office of Energy Efficiency and Renewable Energy DECEMBER 2010 DOE/EA-1782 ACRONYMS AND ABBREVIATIONS ABPP Avian and Bat Protection Plan CFR Code of Federal Regulations BGEPA Bald and Golden Eagle Act dBA A-weighted decibel dB decibel DNREC (Delaware) Department of Natural Resources and Environmental Control DOE U.S. Department of Energy (also called the Department) DOI U.S. Department of the Interior

116

Sandy Ridge | Open Energy Information  

Open Energy Info (EERE)

Sandy Ridge Sandy Ridge Facility Sandy Ridge Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Algonquin Power Developer Gamesa Energy Purchaser Merchant Location Bald Eagle PA Coordinates 40.75088201°, -78.23842764° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.75088201,"lon":-78.23842764,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

117

Category:Oil and Gas | Open Energy Information  

Open Energy Info (EERE)

Gas Gas Jump to: navigation, search This category includes companies and information related to oil (petroleum) or natural gas. Pages in category "Oil and Gas" The following 114 pages are in this category, out of 114 total. A Abu Dhabi National Oil Company Abu Dhabi Supreme Petroleum Council Al Furat Petroleum Company Alabama Oil and Gas Board Alaska Division of Oil and Gas Alaska Oil and Gas Conservation Commission Algeria Ministry of Energy and Mining Archaeological Resource Protection Act Archaeological Resources Protection Act Arizona Oil and Gas Commission Arkansas Oil and Gas Commission B Bahrain National Gas and Oil Authority Bald and Golden Eagle Protection Act C California Division of Oil, Gas, and Geothermal Resources California Environmental Quality Act

118

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

119

Habitat Evaluation Procedures (HEP) Report; Priest River Project, Technical Report 2005.  

DOE Green Energy (OSTI)

On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 140.73 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 60.05 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland meadow habitat provides 7.39 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 71.13 HUs for mallard, yellow warbler, and white-tailed deer. Open water habitat provides 2.16 HUs for Canada goose and mallard. The objective of using HEP at the Priest River Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-05-01T23:59:59.000Z

120

Habitat Evaluation Procedures (HEP) Report; West Beaver Lake Project, Technical Report 2005  

DOE Green Energy (OSTI)

On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 82.69 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 8.80 HUs for mallard, muskrat, and Canada goose. Conifer forest habitat provides 70.33 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Open water provides 3.30 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Habitat Evaluation Procedures (HEP) Report; Upper Trimble Project, Technical Report 2004-2005.  

DOE Green Energy (OSTI)

On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Upper Trimble property, an acquisition completed by the Kalispel Tribe of Indians in March 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Upper Trimble Project provides a total of 250.67 Habitat Units (HUs) for the species evaluated. Wet meadow provides 136.92 HUs for mallard, muskrat, and Canada goose. Mixed forest habitat provides 111.88 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub vegetation provides 1.87 HUs for yellow warbler, and white-tailed deer. The objective of using HEP at the Upper Trimble Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

Entz, Ray

2005-02-01T23:59:59.000Z

122

R E P O R T Soils of Eagle Crater and Meridiani Planum at the  

E-Print Network (OSTI)

of vesicular clasts may represent basaltic sand sources. Eolian ripples, armored by well-sorted hematite

Glotch, Timothy D.

123

Chattanooga Eagle Ford Western Gulf TX-LA-MS Salt Basin Uinta Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Western Western Gulf TX-LA-MS Salt Basin Uinta Basin Devonian (Ohio) Marcellus Utica Bakken*** Avalon- Bone Spring San Joaquin Basin Monterey Santa Maria, Ventura, Los Angeles Basins Monterey- Temblor Pearsall Tuscaloosa Big Horn Basin Denver Basin Powder River Basin Park Basin Niobrara* Mowry Niobrara* Heath** Manning Canyon Appalachian Basin Antrim Barnett Bend New Albany Woodford Barnett- Woodford Lewis Hilliard- Baxter- Mancos Excello- Mulky Fayetteville Floyd- Neal Gammon Cody Haynesville- Bossier Hermosa Mancos Pierre Conasauga Michigan Basin Ft. Worth Basin Palo Duro Basin Permian Basin Illinois Basin Anadarko Basin Greater Green River Basin Cherokee Platform San Juan Basin Williston Basin Black Warrior Basin A r d m o r e B a s i n Paradox Basin Raton Basin Montana Thrust Belt Marfa Basin Valley & Ridge Province Arkoma Basin Forest

124

Clipping the Eagle's Wings: The Limiting of the Korean Air War, 1950-1953  

E-Print Network (OSTI)

Purpose: This work examines the transition in aerial warfare that took place during the Korean War (1950-1953). Before the conflict, air power was conceived of primarily an instrument of unlimited, or total, warfare. Yet Korea, and all subsequent air wars, have been limited. The transitional nature of the Korean air war has not yet been adequately explored by historians. Methods: The story of this shift is presented in two parts, the first examining the doctrines of the United States Air Force (USAF) immediately before the Korean War, the second comparing them to the USAFs actual campaigns in Korea. This focus on the USAF reflects both its status as the principal air service in Korea and its influence on the theories and doctrines of all air arms in the post-World War Two era. The USAFs planning immediately before the Korean War focused on its role in a possible total war between the United States and the Soviet Union. It was thus unprepared and ill-equipped for the limited war in Korea and had to improvise its operations there. Findings: The inability of the USAF to conduct an unlimited war in Korea frustrated many Americans, who could not understand the political considerations that limited the conflict, seeing only that the USAF, the worlds most powerful air arm, was prevented from using all of its resources. While the resulting controversy contributed to a change of administration in the United States, it had less of an effect on the USAF. After the Korean War ended, its leadership continued to focus on unlimited war, dismissing the conflict as an aberration from which little about the operation of aircraft in war could be learned. Conclusions: The failure to recognize the lessons of the Korean War has had serious consequences. There have been no total wars since 1945; every air war of the past sixty years has been limited. Limited warfare is defined by restrictions on air power. The USAF and other air arms were slow to adapt to the changing conditions. The Korean War was a more significant event in the history of aerial warfare than is generally appreciated.

Horky, Roger Karl

2013-05-01T23:59:59.000Z

125

A Risk Analysis Framework for Golden Eagle Population Responses to Wind Power  

Science Conference Proceedings (OSTI)

The development of quick snapshot metrics that can serve as reliable diagnostic tools for assessing avian population status has great appeal. In this study, stochastic simulation modeling and tree-structured regression analyses were used to evaluate the reliability of two proposed snapshot metrics in territorial birds: the floater/breeder ratio and the rate of nest occupancy by immature subadults. The demographic model, parameterized with field data from an intensively studied ...

2012-12-15T23:59:59.000Z

126

Bulk Dissolution Standard Operating Procedure Written by: Meagan Eagle, May 2002  

E-Print Network (OSTI)

of extracts. In the procedure reported here biological tissues are digested with nitric acid using an aluminum solid and liquid transfers and reduce equipment requirements. Nitric acid was used for all digestions as it has previously been shown that nitric acid quantitatively releases trace elements from biological

Paytan, Adina

127

Production patterns in Eagle Ford Shale (Decline Curve Analysis) Muoz Torres, J.1  

E-Print Network (OSTI)

that there were vast natural gas resources in unconventional reservoirs like coal seams, tight sand and shales in the United States and elsewhere. That's the positive surprise. On the negative side, the severity of the oil spill in the Gulf of Mexico could well turn the global public against oil and natural gas exploration

Texas at Austin, University of

128

Eagles and dragons at sea: The inevitable strategic collision between the United States and China. Final report  

Science Conference Proceedings (OSTI)

Collision is imminent. To advance China`s expanding maritime interests, the Chinese Navy is altering its strategic direction from ground-support missions to open-water operations. Meanwhile, the U.S. Navy is maintaining a steady course to strongly affirm the U.S. continuing commitment in the region. Thus, on the `offshore` waters of the Western Pacific, the strategies of these two navies will inevitably collide. East Asia remains vital to America`s economic renewal. It has the world`s fastest-growing economies. It is also the U.S. biggest export market. Therefore, America`s continued economic growth is tied to the region`s enduring prosperity and security. But, all is not well in East Asia. There are a number of `hot spots` that threaten regional stability. More importantly, behind almost every flash point in the area, China`s shadow looms large in the distance. China is an emerging maritime power with towering aspirations. Clearly, the Chinese Navy will play a crucial role in promoting those ambitions. However, as the Chinese fleet prepares to sail away from its familiar shores, it is quickly discovering that the U.S. Navy`s shadow looms even larger in the not too distant horizon.

Zalamea, U.O.

1996-03-06T23:59:59.000Z

129

Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.  

SciTech Connect

The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

Creveling, Jennifer

1986-08-01T23:59:59.000Z

130

Wildlife Impact Assessment Palisades Project, Idaho, Final Report.  

DOE Green Energy (OSTI)

The Habitat Evaluation Procedures were used to evaluate pre- and post-construction habitat conditions of the US Bureau of Reclamation's Palisades Project in eastern Idaho. Eight evaluation species were selected with losses expressed in the number of Habitat Units (HU's). One HU is equivalent to one acre of prime habitat. The evaluation estimated that a loss of 2454 HU's of mule deer habitat, 2276 HU's of mink habitat, 2622 HU's of mallard habitat, 805 HU's of Canada goose habitat, 2331 HU's of ruffed grouse habitat, 5941 and 18,565 HU's for breeding and wintering bald eagles, and 1336 and 704 HU's for forested and scrub-shrub wetland nongame species occurred as a result of the project. The study area currently has 29 active osprey nests located around the reservoir and the mudflats probably provide more feeding habitat for migratory shore birds and waterfowl than was previously available along the river. A comparison of flow conditions on the South Fork of the Snake River below the dam between pre- and post-construction periods also could not substantiate claims that water releases from the dam were causing more Canada goose nest losses than flow in the river prior to construction. 41 refs., 16 figs., 9 tabs.

Sather-Blair, Signe

1985-02-01T23:59:59.000Z

131

Pend Oreille Wetlands Wildlife Mitigation Project Management Plan for the "Dilling Addition".  

DOE Green Energy (OSTI)

This report is a recommendation from the Kalispel Tribe to the Bonneville Power Administration (BPA) and the Columbia Basin Fish and Wildlife Authority (CBFWA) for management of the Pend Oreille Wetland Wildlife Mitigation project II (Dilling Addition) for the extensive habitat losses caused by Albeni Falls Dam on Kalispel Ceded Lands. Albeni Falls Dam is located on the Pend Oreille River near the Washington-Idaho border, about 25 miles upstream of the Kalispel Indian Reservation. The dam controls the water level on Lake Pend Oreille. The lake was formerly the center of subsistence use by the Kalispel Tribe. Flooding of wetlands, and water fluctuations both on the lake and downstream on the river, has had adverse impacts to wildlife and wildlife habitat. An extensive process was followed to formulate and prioritize wildlife resource goals. The Kalispel Natural Resource Department provided guidance in terms of opportunities onsite. To prioritize specific goals, the Albeni Falls Interagency Work Group and the Columbia Basin Fish and Wildlife Authority Wildlife Caucus were consulted. From this process, the top priority goal for the Kalispel Tribe is: Protect and develop riparian forest and shrub, and freshwater wetlands, to mitigate losses resulting from reservoir inundation and river level fluctuations due to Albeni Falls Dam. Indicator species used to determine the initial construction/inundation loses and mitigation project gains include Bald Eagle (breeding and wintering), Black-capped Chickadee, Canada Goose, Mallard, muskrat, white-tailed deer, and Yellow Warbler.

Entz, Ray D.

1999-01-15T23:59:59.000Z

132

Bird Mortaility at the Altamont Pass Wind Resource Area: March 1998--September 2001  

Science Conference Proceedings (OSTI)

Over the past 15 years, research has shown that wind turbines in the Altamont Pass Wind Resource Area (APWRA) kill many birds, including raptors, which are protected by the Migratory Bird Treaty Act (MBTA), the Bald and Golden Eagle Protection Act, and/or state and federal Endangered Species Acts. Early research in the APWRA on avian mortality mainly attempted to identify the extent of the problem. In 1998, however, the National Renewable Energy Laboratory (NREL) initiated research to address the causal relationships between wind turbines and bird mortality. NREL funded a project by BioResource Consultants to perform this research directed at identifying and addressing the causes of mortality of various bird species from wind turbines in the APWRA.With 580 megawatts (MW) of installed wind turbine generating capacity in the APWRA, wind turbines there provide up to 1 billion kilowatt-hours (kWh) of emissions-free electricity annually. By identifying and implementing new methods and technologies to reduce or resolve bird mortality in the APWRA, power producers may be able to increase wind turbine electricity production at the site and apply similar mortality-reduction methods at other sites around the state and country.

Smallwood, K. S.; Thelander, C. G.

2005-09-01T23:59:59.000Z

133

Istiophorid billfishes in the Atlantic Ocean experience considerable fish-  

E-Print Network (OSTI)

model was the Eagle Claw L2004EWF, size 8/0 (Eagle Claw, Denver, CO). As is typical for this fish- ery

Hartley, Troy W.

134

Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.  

DOE Green Energy (OSTI)

Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

Noyes, J.H.

1986-02-01T23:59:59.000Z

135

Wildlife and Wildlife Habitat Loss Assessment at Detroit Big Cliff Dam and Reservoir Project, North Santiam River, Oregon, 1985 Final Report.  

DOE Green Energy (OSTI)

A habitat based assessment was conducted of the US Army Corps of Engineers' Detroit/Big Cliff Dam and Reservoir Project (Detroit Project) on the North Santiam River, Oregon, to determine losses or gains resulting from the development and operation of the hydroelectric-related components of the project. Preconstruction, postconstruction, and recent vegetation cover types at the project site were mapped based on aerial photographs from 1939, 1956, and 1979, respectively. Vegetation cover types were identified within the affected area and acreages of each type at each time period were determined. Ten wildlife target species were selected to represent a cross-section of species groups affected by the project. An interagency team evaluated the suitability of the habitat to support the target species at each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the project. The Detroit Project extensively altered or affected 6324 acres of land and river in the North Santiam River drainage. Impacts to wildlife centered around the loss of 1,608 acres of conifer forest and 620 acres of riparian habitat. Impacts resulting from the Detroit Project included the loss of winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, river otter, beaver, ruffed grouse, pileated woodpecker, spotted owl, and many other wildlife species. Bald eagle and osprey were benefited by an increase in foraging habitat. The potential of the affected area to support wildlife was greatly altered as a result of the Detroit Project. Losses or gains in the potential of the habitat to support wildlife will exist over the life of the project.

Noyes, J.H.

1985-02-01T23:59:59.000Z

136

Habitat Evaluation Procedures (HEP) Report; Big Island - The McKenzie River, Technical Report 1998-2001.  

DOE Green Energy (OSTI)

The Big Island site is located in the McKenzie River flood plain, containing remnant habitats of what was once more common in this area. A diverse array of flora and fauna, representing significant wildlife habitats, is present on the site. Stands of undisturbed forested wetlands, along with riparian shrub habitats and numerous streams and ponds, support a diversity of wildlife species, including neotropical migratory songbirds, raptors, mammals, reptiles, and amphibians (including two State-listed Sensitive Critical species). The project is located in eastern Springfield, Oregon (Figure 1). The project area encompasses 187 acres under several ownerships in Section 27 of Township 17S, Range 2W. Despite some invasion of non-native species, the site contains large areas of relatively undisturbed wildlife habitat. Over several site visits, a variety of wildlife and signs of wildlife were observed, including an active great blue heron rookery, red-Legged frog egg masses, signs of beaver, and a bald eagle, Wildlife habitat values resulting from the purchase of this site will contribute toward the goal of mitigating for habitat lost as outlined in the Bonneville Power Administration's (BPA) Mitigation and Enhancement Plan for the Willamette River Basin. Under this Plan, mitigation goals and objectives were developed as a result of the loss of wildlife habitat due to the construction of Federal hydroelectric facilities in the Willamette River Basin. Results of the Habitat Evaluation Procedures (HEP) will be used to: (1) determine the current habitat status of the study area and habitat enhancement potential of the site consistent with wildlife mitigation goals and objectives; and (2) develop a management plan for the area.

Sieglitz, Greg

2001-03-01T23:59:59.000Z

137

Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) Lining Main Canal Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement District No. 1 to the Bureau of Reclamation and North American Development Bank. The proposed project involves lining 3 miles of the Main Canal with a urethane lining and a concrete anchor and ballast system. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0001322 per BTU ($0.451 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -13.65.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2004-01-01T23:59:59.000Z

138

Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) Lining Main Canal Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement District No. 1 to the Bureau of Reclamation and North American Development Bank. The proposed project involves lining 3 miles of the Main Canal with a urethane lining and a concrete anchor and ballast system. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0001322 per BTU ($0.451 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -13.65.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2004-04-01T23:59:59.000Z

139

Low Wind Speed Technology Phase II: Sweep-Twist Blade Design and Fabrication with Atmospheric Test Verification  

DOE Green Energy (OSTI)

This fact sheet describes NREL's subcontract with Knight & Carver to develop a sweep-twist adaptive balde to reduce loads and allow a larger more productive rotor.

Not Available

2006-06-01T23:59:59.000Z

140

Gas Mileage of 1984 Vehicles by American Motors Corporation  

NLE Websites -- All DOE Office Websites (Extended Search)

4 American Motors Corporation Vehicles 4 American Motors Corporation Vehicles EPA MPG MODEL City Comb Hwy 1984 American Motors Corporation Eagle 4WD 4 cyl, 2.5 L, Manual 4-spd, Regular Gasoline Compare 1984 American Motors Corporation Eagle 4WD 19 City 20 Combined 22 Highway 1984 American Motors Corporation Eagle 4WD 4 cyl, 2.5 L, Manual 5-spd, Regular Gasoline Compare 1984 American Motors Corporation Eagle 4WD 19 City 21 Combined 23 Highway 1984 American Motors Corporation Eagle 4WD 6 cyl, 4.2 L, Automatic 3-spd, Regular Gasoline Compare 1984 American Motors Corporation Eagle 4WD 15 City 17 Combined 20 Highway 1984 American Motors Corporation Eagle 4WD 6 cyl, 4.2 L, Manual 4-spd, Regular Gasoline Compare 1984 American Motors Corporation Eagle 4WD 16 City 17 Combined 20 Highway 1984 American Motors Corporation Eagle 4WD 6 cyl, 4.2 L, Manual 5-spd, Regular Gasoline

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A Mechanism for Coronal Hole Jets  

E-Print Network (OSTI)

Bald patches are magnetic topologies in which the magnetic field is concave up over part of a photospheric polarity inversion line. A bald patch topology is believed to be the essential ingredient for filament channels and is often found in extrapolations of the observed photospheric field. Using an analytic source-surface model to calculate the magnetic topology of a small bipolar region embedded in a global magnetic dipole field, we demonstrate that although common in closed-field regions close to the solar equator, bald patches are unlikely to occur in the open-field topology of a coronal hole. Our results give rise to the following question: What happens to a bald patch topology when the surrounding field lines open up? This would be the case when a bald patch moves into a coronal hole, or when a coronal hole forms in an area that encompasses a bald patch. Our magnetostatic models show that, in this case, the bald patch topology almost invariably transforms into a null point topology with a spine and a fan. We argue that the time-dependent evolution of this scenario will be very dynamic since the change from a bald patch to null point topology cannot occur via a simple ideal evolution in the corona. We discuss the implications of these findings for recent Hinode XRT observations of coronal hole jets and give an outline of planned time-dependent 3D MHD simulations to fully assess this scenario.

D. A. N. Mueller; S. K. Antiochos

2008-04-24T23:59:59.000Z

142

Oak Ridge National Environmental Research Park -- Research Park...  

NLE Websites -- All DOE Office Websites (Extended Search)

is NOT routinely open to the public, public events allowing access are being planned. Eagles - Jim Evans, TWRA During the mid-winter eagle survey on January 11, Jim Evans saw...

143

Remembering Edgar Bowers: The Years of Friendship with Elroy L. Bundy, 1967-1975  

E-Print Network (OSTI)

sometimes eagle, sometimes anaconda--perceived Roy and hisof Douanier Rousseau, The anaconda.. Edgar then names theEdgar, the would-be eagle-anaconda and warm, responsive,

Bundy, Barbara

2003-01-01T23:59:59.000Z

144

Phylogeny of the pollinating yucca moths, with revision of Mexican species (Tegeticula and Parategeticula;  

E-Print Network (OSTI)

in the Winter Garden area in the south. In the Eagle Ford Shale play, fracking is used to create pathways

Althoff, David M.

145

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inc., Crowder College, Moark Productions, Talbot Industries, Freeman Neosho Hospital, Brass Eagle Paintball Products, Crowder Industries, BRANCO Enterprises, Inc., Sunbeam...

146

Alternative Fuels Data Center: Heavy-Duty Vehicle and Engine...  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Elgin Sweeper Company - Broom BearCrosswindEaglePelican General Motors - 3.0L Fuel Type: CNG Displacement: 3...

147

Sullivan County, Pennsylvania: Energy Resources | Open Energy...  

Open Energy Info (EERE)

Climate Zone Subtype A. Places in Sullivan County, Pennsylvania Dushore, Pennsylvania Eagles Mere, Pennsylvania Forksville, Pennsylvania Laporte, Pennsylvania Retrieved from...

148

Evaluation of Preg-Robbing in Goldstrike Carbonaceous Ore Using ...  

Science Conference Proceedings (OSTI)

Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future An Alternative Automated Electron Beam Technology for Gold Characterization.

149

The Mineralogy and Predictive Metallurgy of Major Types of Gold Ores  

Science Conference Proceedings (OSTI)

Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future An Alternative Automated Electron Beam Technology for Gold Characterization.

150

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36)  

Science Conference Proceedings (OSTI)

The compliance checklist for this project was originally completed by the Burns Paiute Tribe in 2000, and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD), as well as the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Logan Valley Wildlife Mitigation Plan, now being implemented, continues to be consistent with the above mentioned EISs and RODs. Pursuant to its obligations under the Endangered Species Act, BPA has made a determination of whether its proposed project will have any effects on any listed species under the jurisdiction of the United States Fish and Wildlife Service (USFWS). A species list was obtained from USFWS on June 12, 2003, identifying bald eagles, Canada lynx, and bull trout as potentially occurring in the project area. A site assessment was conducted on July 15, 2003 to determine if these species were present and the potential effects of project activities. A ''No Effect'' determination was made for all ESA-listed species. There were no listed species under the jurisdiction of NOAA Fisheries present in the project area. As management activities proceed in the future, BPA will annually re-assess potential effects of planned activities on listed species. The Burns-Paiute Tribe conducted a literature search for historic and archaeological sites on the property on January 11, 1999. No known sites were identified. Further site-specific surveys will be conducted for individual ground disturbing activities. The results of these surveys will be sent to the Oregon State Historic Preservation Office and BPA. BPA will annually summarize and submit a report to the State Historic Preservation Office. On December 29, 1999, Fred Walasavage of BPA completed a Phase I Site Assessment and concluded that the site did not reveal any environmental factors that would pose a significant liability for remedial action or cleanup under the Comprehensive Recovery, Compensation and Liability Act. A public meeting was held when the property was initially acquired where the property acquisition and proposed activities were discussed. Subsequent public involvement was conducted on July 23, 2002 for commenting on the proposed Logan Valley Wildlife Mitigation Plan.

N /A

2003-10-10T23:59:59.000Z

151

Aleutian Pribilof Islands Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy options for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski and Sand Point have allowed for proper wind turbine siting without killing birds, especially endangered species and bald eagles. APIA continues coordinating and looking for funding opportunities for regional renewable energy projects. An important goal for APIA has been, and will continue to be, to involve community members with renewable energy projects and energy conservation efforts.

Bruce A. Wright

2012-03-27T23:59:59.000Z

152

Das knstliche Schilf bei der Neuenburger Arteplage wiegt sich bereits im Wind. Hier knnen sich bald auch die Expo-Besucher mit dem intelligenten Raum der Zrcher Hochschulen auseinandersetzen. F O T O S : N A N A P E R N O D  

E-Print Network (OSTI)

(IMK-IFU), Forschungszentrum, Karlsruhe (4) Institut für Energiewirtschaft und Rationelle (IMK-IFU), Forschungszentrum, Karlsruhe (4) Institut für Energiewirtschaft und Rationelle

153

Hnt'k'wipn 2005 Habitat Evaluation Procedure Report.  

SciTech Connect

The construction of Albeni Falls Dam was completed in 1955. Prior to construction, the dam was expected to alter approximately 6,300 acres. However, the loss assessment addressed the losses in terms of Habitat Units (HUs) (Martin et al. 1988). HUs are derived by multiplying the Habitat Suitability Index (HSI) by the number of acres in question. The HSI, in turn, is an index to the habitat carrying capacity for a specific species or guild of species based on a set of habitat performance measures and can be used to assess changes, both positive and negative, in habitat quantity and quality (USFWS 1980, 1980a). The HSI is derived though a HEP that is completed according to species or guild specific models. Variables defined in the models are measured on the landscape; and those measured values are rated according to the model to produce an index to the habitat's suitability. The HSI index ranges from 0.0 to 1.0. An HSI of 0.3 indicates that habitat quality/carrying capacity is marginal while an HSI of 0.7 suggests that habitat quality/carrying capacity is relatively good. Thus an acre of optimum habitat (HSI = 1.0) results in 1 HU. The construction and inundation of Albeni Falls Dam resulted in a loss of 28,587 HUs. This HU ledger was the sum of the losses for each of the chosen target species, which were 5,985 mallard HUs, 4,699 Canada goose HUs, 3,379 redhead HUs, 4,508 breeding bald eagle HUs, 4,365 wintering bald eagle HUs, 2,286 black-capped chickadee HUs, 1,680 white tailed deer HUs, and 1,756 muskrat HUs. The PACIFIC NORTHWEST ELECTRIC POWER PLANNING AND CONSERVATION ACT (1980) made mitigating against the HU ledger associated with the Federal Columbia River Power System (FCRPS), of which Albeni Falls is a part, the responsibility of BPA. The Act also established the Northwest Power and Conservation Council (NPCC), which is responsible for, among other things, establishing the Fish and Wildlife Program to direct the mitigation process. The Bonneville Power Administration funded the acquisition of the mitigation properties covered in this baseline HU assessment in accordance with the NPCC's Fish and Wildlife Program and is due the appropriate HU crediting for both protecting and enhancing that area. The mitigation property is composed of three separate property acquisitions completed in the southern portion of the Coeur d'Alene Indian Reservation (Figure 1). These acreages are contiguous (Figure 2) and were targeted because of their potential instream, wetland and riparian habitats. The 909 acre Hanson Property was purchased fee title in December of 2004 and includes the northern and southern most parcels. The 159.7 acre Allotment 331 was purchased in February of 2005 and lies along Hangman Creek and includes the majority of the forested land. Allotments 1021, 333A and 333B, which were acquired in September of 2005, lie along Hangman Creek upstream of Allotment 331 and are 160 acres, 80 acres and 75 acres respectively. The Allotments remain in Trust but are now held by the Department of Interior for the Coeur d'Alene Tribe rather than for individual Tribal members. Approximately 174.8 acres (acreage determined by Coeur d'Alene Tribal GIS) of the Hanson Property lies south and west of U.S. Highway 95. These 174.8 acres encompass uplands along with a farmstead that includes a dwelling, several shops, storage sheds and a loft barn. The Coeur d'Alene Tribe decided at the time of purchase not to retain those uplands in the mitigation program since uplands and residential areas are not suitable to the Albeni Falls Wildlife Mitigation Program. This baseline HU assessment encompasses only the contiguous acreages that lie north and east of U.S. Highway 95. This report is a summary of the 2005 baseline Habitat Evaluation Procedures (HEP) conducted on the 1,195.2 acres (as determined from the Coeur d'Alene Tribe's GIS database) of hnt'k'wipn surrounding the confluence of Sheep Creek and Hangman Creeks on the Coeur d'Alene Indian Reservation. The Bonneville Power Administration was guaranteed a minimum of 364 protection HUs for th

Green, Gerald I.

2007-02-01T23:59:59.000Z

154

MAGAZINder Heinrich-Heine-Universitt Dsseldorf 1 2008 als wir die Titelgeschichte(n) planten  

E-Print Network (OSTI)

Düsseldorf bald das deutsche China-Zentrum? . . . . . . . . . 10 China ­ auf ein Wort . . . . . . . . . . . . . . . . . . . . . . 21 Integrierter deutsch-französischer Studiengang . . . . . . . . 21 Philosophische Fakultät ,,Will Neurowissenschaften: Prof. Schnitzler . . . . . . . . . . . . . . . . . 41 Pharmazeutische Chemie: ,,Tatort": Hörsaal

Schiller, Stephan

155

Reconstruction and Analysis of Spring Rainfall over the Southeastern U.S. for the Past 1000 Years  

Science Conference Proceedings (OSTI)

Tree-ring chronologies can provide surprisingly accurate estimates of the natural variability of important climate parameters such as precipitation and temperature during the centuries prior to the Industrial Revolution. Bald cypress tree-ring ...

David W. Stahle; Malcolm K. Cleaveland

1992-12-01T23:59:59.000Z

156

Low Wind Speed Technology Phase II: Sweep-Twist Blade Design and Fabrication with Atmospheric Test Verification  

SciTech Connect

This fact sheet describes NREL's subcontract with Knight & Carver to develop a sweep-twist adaptive balde to reduce loads and allow a larger more productive rotor.

2006-06-01T23:59:59.000Z

157

CX-010146: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades CX(s) Applied: B1.19 Date: 04/24/2013 Location(s): Montana, Montana, Idaho Offices(s): Bonneville Power Administration

158

EIS-0471: Department of Energy Loan Guarantee to Support Proposed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County,...

159

Microsoft Word - CSP_RP_PhaseI_051305.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

*(2) Eagle Operating, Inc. Encore Acquisition Company Fischer Oil & Gas, Inc. Marathon Oil Company Occidental Petroleum Oxy Permian Ltd. Saskatchewan Industry and Resources...

160

Hydraulic fracture orientation for miscible gas injection EOR in the Elm Coulee field.  

E-Print Network (OSTI)

??There is tremendous potential for shale oil reservoirs, such as the Bakken Formation, Eagle Ford and Niobrara to have a lasting impact on the U.S (more)

Xu, Tao

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

G:arrFIELD CODE 6 FILESPreliminary Section 3  

U.S. Energy Information Administration (EIA)

craig dome moffat craig 168047 denova washington de nova 183727 florence fremont florence-canon city 245815 golden eagle las animas purgatoire river ...

162

G:arrFIELD CODE 5 FILESPreliminary Section 3  

U.S. Energy Information Administration (EIA)

craig dome moffat craig 168047 denova washington de nova 183727 florence fremont florence-canon city 245815 golden eagle las animas purgatoire river ...

163

Economic Development  

NLE Websites -- All DOE Office Websites (Extended Search)

Corporation: 20,500 for upgrades to existing accounting software and training Three Eagles Development Corporation, Picuris Pueblo: 10,800 to update computer and account...

164

Overcoming Complexity in the Teaching and Learning Environment  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

165

Energy Recovery Opportunities in Pyroprocessing of Nickel Laterites  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

166

Thunderstorms  

NLE Websites -- All DOE Office Websites (Extended Search)

roofs, bare hillsides and cultivated fields on sunny days. It is these columns which eagles, hawks, and buzzards utilize to soar effortlessly. Glider pilots also use them and...

167

Physical Chemistry of Sulfide Self-Heating  

Science Conference Proceedings (OSTI)

Geology and Hydrothermal Alteration of the Gold Eagle Deposit: A New Discovery in the Red Lake Camp, Canada Green State Joining of Silicon Nitride to Itself...

168

In-Vivo Evaluation of 13-93 Bioactive Glass Scaffolds Made by ...  

Science Conference Proceedings (OSTI)

In-vitro, the compressive strength of the SLS scaffolds was measured as a function of time for up to three months when immersed in Dubelcos Modified Eagles...

169

A Review of Pyro, Hydro and Electro-metallurgical Processes for ...  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

170

2000 Electronic Materials Conference: Technological Exhibition - TMS  

Science Conference Proceedings (OSTI)

Cree, Inc. Philips Analytical. Digital Instruments, Riber, Inc. Eagle-Picher Industries, Inc. SAES Pure Gas, Inc. EPI MBE Products Group, SVT Associates, Inc.

171

Engineering and Human Resource Development: Design as a ...  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

172

Environmental Degradation Meeting 2005  

Science Conference Proceedings (OSTI)

Aug 14, 2005 ... Location: Cliff Lodge, Golden Cliff/Eagle's Nest. All meeting attendees are invited to a welcoming reception gathering. Additional details will be...

173

Dehydration of Magnesium Chloride Hexahydrate  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

174

Frontiers in Biological and Biomedical Materials - Programmaster.org  

Science Conference Proceedings (OSTI)

Oct 19, 2011... Dubelcos Modified Eagles Medium (DMEM) at 38C. In-vivo, the cylindrical scaffolds with and without bone morphogenic protein-2 (BMP-2),...

175

B&W awards college scholarship to local student | Y-12 National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Band and Orchestra Association. At Tennessee Tech, Jones is a member of the Golden Eagles marching band. B&W scholarships are awarded based on academic achievement and...

176

The Structure of Peirce-Smith Converting Schedules  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

177

COM 2011 (held with the World Gold Conference), POSTER SESSION  

Science Conference Proceedings (OSTI)

Geology and Hydrothermal Alteration of the Gold Eagle Deposit: A New Discovery in the Red Lake Camp, Canada Green State Joining of Silicon Nitride to Itself...

178

Process-scale Converter Experiments on High Pressure Tuyere ...  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

179

Automobile Catalytic Converters: Purpose, Reactions and Recycle  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

180

Developments in the Magnesium Industry  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

2006 TMS Annual Meeting: Special Events  

Science Conference Proceedings (OSTI)

Her career ranged from the one woman engineer on the Eagle minicomputer design project at Data General to vice president of product management and...

182

Five companies received funding through new venture acceleration...  

NLE Websites -- All DOE Office Websites (Extended Search)

proposals and those receiving funding included: San Ildefonso Development Corp., Three Eagles Development Corp., Cochitit Pueblo Development Corp., Sunbeam Indian Art and Avanyu...

183

First 15 Years of Operation of the Noranda Converter  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

184

1999 Electronic Materials Conference: Exhibit Information - TMS  

Science Conference Proceedings (OSTI)

Jul 2, 1999 ... Charles Evan & Associates Cree Research Digital Instruments Eagle-Picher Technologies, LLC Emcore Corporation EPI MBE Products Group

185

Flotation Hydrodynamic Measurements for Circuit Benchmarking at ...  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials Tundish Process Performance Improvement: Some Indian Case...

186

Experiments with Oval: A Radically Tailorable Tool for Cooperative Work  

E-Print Network (OSTI)

-333), Cambridge, MA 02139; email: malone@eagle.mit. edu; K.-Y. Lai, McKinsey & Company, 18/F Two Exchange Square

187

Award Recipient of the ENERGY STAR Challenge for Industry  

NLE Websites -- All DOE Office Websites (Extended Search)

Award Recipient of the ENERGY STAR Challenge for Industry Danville Facility (Tape) Intertape Polymer Corporation 1101 Eagle Springs Road Danville, Virginia 24540 The Intertape...

188

U.S. monthly crude oil production reaches highest level since ...  

U.S. Energy Information Administration (EIA)

... Eagle Ford formation in South Texas and the Permian Basin in West Texas. North Dakota's increase in oil production comes from the Bakken formation in the ...

189

Michigan's 15th congressional district: Energy Resources | Open...  

Open Energy Info (EERE)

EaglePicher Horizon Batteries LLC Energy Options Solutions Ford Ford Electric Battery Group Integrated Sensing Systems Inc ISSYS Masco Masco Home ServicesWellHome...

190

Alternative Fuels Data Center: Heavy-Duty Vehicle and Engine...  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Elgin Sweeper Company - Broom BearCrosswindEaglePelican Ford Motor Co. - 2.5L Propane Fuel Type: Propane Displacement: 2.5 liters...

191

Search by Make for 1994 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Select Make... Acura Alfa Romeo Audi BMW Buick Cadillac Chevrolet Chrysler Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini Land Rover...

192

Search by Make for 1996 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Select Make... Acura Audi BMW Buick Cadillac Chevrolet Chrysler Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini Land Rover Lexus Lincoln...

193

Search by Model for 1993 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Select Make... Acura Alfa Romeo Aston Martin Audi Autokraft Limited BMW Buick Cadillac Chevrolet Chrysler CX Automotive Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti...

194

Search by Model for 1990 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

90 Select Make... Acura Alfa Romeo Audi BMW Buick Cadillac Chevrolet Chrysler Consulier Industries Inc Daihatsu Dodge Eagle Evans Automobiles Ferrari Ford Geo GMC Honda Hyundai...

195

Search by Make for 1997 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Select Make... Acura Aston Martin Audi BMW Buick Cadillac Chevrolet Chrysler Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini Land Rover...

196

Search by Make for 1989 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Select Make... Acura Alfa Romeo Aston Martin Audi Bertone BMW Buick Cadillac Chevrolet Chrysler CX Automotive Daihatsu Dodge Eagle Environmental Rsch and Devp Corp Evans...

197

Search by Model for 1989 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Select Make... Acura Alfa Romeo Aston Martin Audi Bertone BMW Buick Cadillac Chevrolet Chrysler CX Automotive Daihatsu Dodge Eagle Environmental Rsch and Devp Corp Evans...

198

Search by Model for 1994 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Select Make... Acura Alfa Romeo Audi BMW Buick Cadillac Chevrolet Chrysler Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini Land Rover...

199

Search by Make for 1993 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Select Make... Acura Alfa Romeo Aston Martin Audi Autokraft Limited BMW Buick Cadillac Chevrolet Chrysler CX Automotive Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti...

200

Search by Model for 1995 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Select Make... Acura Alfa Romeo Audi BMW Buick Cadillac Chevrolet Chrysler Dabryan Coach Builders Inc Dodge Eagle Federal Coach Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu...

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Search by Model for 1988 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Select Make... Acura Alfa Romeo Aston Martin Audi Aurora Cars Ltd Bertone BMW Buick Cadillac CCC Engineering Chevrolet Chrysler CX Automotive Dacia Daihatsu Dodge Eagle Ferrari...

202

Search by Make for 1998 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Select Make... Acura Aston Martin Audi Bentley BMW Buick Cadillac Chevrolet Chrysler Daewoo Dodge Eagle Ferrari Ford GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini...

203

Search by Make for 1988 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Select Make... Acura Alfa Romeo Aston Martin Audi Aurora Cars Ltd Bertone BMW Buick Cadillac CCC Engineering Chevrolet Chrysler CX Automotive Dacia Daihatsu Dodge Eagle Ferrari...

204

Search by Make for 1992 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Select Make... Acura Alfa Romeo Aston Martin Audi Autokraft Limited BMW Buick Cadillac Chevrolet Chrysler Consulier Industries Inc CX Automotive Daihatsu Dodge Eagle Ferrari Ford...

205

Search by Model for 1996 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Select Make... Acura Audi BMW Buick Cadillac Chevrolet Chrysler Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini Land Rover Lexus Lincoln...

206

Search by Model for 1991 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Select Make... Acura Alfa Romeo Aston Martin Audi BMW Buick Cadillac Chevrolet Chrysler Consulier Industries Inc CX Automotive Daihatsu Dodge Eagle Evans Automobiles Ferrari Ford...

207

Search by Model for 1992 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Select Make... Acura Alfa Romeo Aston Martin Audi Autokraft Limited BMW Buick Cadillac Chevrolet Chrysler Consulier Industries Inc CX Automotive Daihatsu Dodge Eagle Ferrari Ford...

208

Search by Model for 1998 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Select Make... Acura Aston Martin Audi Bentley BMW Buick Cadillac Chevrolet Chrysler Daewoo Dodge Eagle Ferrari Ford GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini...

209

Search by Model for 1997 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Select Make... Acura Aston Martin Audi BMW Buick Cadillac Chevrolet Chrysler Dodge Eagle Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu Jaguar Jeep Kia Lamborghini Land Rover...

210

Search by Make for 1990 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

90 Select Make... Acura Alfa Romeo Audi BMW Buick Cadillac Chevrolet Chrysler Consulier Industries Inc Daihatsu Dodge Eagle Evans Automobiles Ferrari Ford Geo GMC Honda Hyundai...

211

Search by Make for 1991 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Select Make... Acura Alfa Romeo Aston Martin Audi BMW Buick Cadillac Chevrolet Chrysler Consulier Industries Inc CX Automotive Daihatsu Dodge Eagle Evans Automobiles Ferrari Ford...

212

Search by Make for 1995 Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Select Make... Acura Alfa Romeo Audi BMW Buick Cadillac Chevrolet Chrysler Dabryan Coach Builders Inc Dodge Eagle Federal Coach Ferrari Ford Geo GMC Honda Hyundai Infiniti Isuzu...

213

Richardson Acts to Save DOE's Research Parks  

Science Conference Proceedings (OSTI)

In ''Preserving DOE's Research Parks'' (Issues, Winter 1997-98 ), we argued that some of the nation's most irreplaceable outdoor laboratories for scientific research and education are at risk of being disposed of by the Department of Energy (DOE). We are pleased that Secretary of Energy Bill Richardson has recently acted to protect the unique values of DOE property, but we believe that more steps should be taken. Since June 1999, Richardson has set aside lands in five of the seven DOE research parks for wildlife preservation, research, education, and recreation. Management plans have been or are being established for 1,000 acres at the Los Alamos National Laboratory in New Mexico, 57,000 acres at the Hanford Nuclear Reserve in Washington, 10,000 acres at the Savannah River Site in Georgia, 74,000 acres at the Idaho National Environmental and Engineering Laboratory, and 3,000 acres at the Oak Ridge Reservation in Tennessee. These sites are to be managed as biological and wildlife preserves, allowing opportunities for research, education, and, for most of them, recreation. ''In places of rare environmental resources,'' Richardson said, ''we have a special responsibility to the states and communities that have supported and hosted America's long effort to win the Cold War and we owe it to future generations to protect these precious places so that they can enjoy nature's plenty just as we do''. The preserves are home to several rare wildlife species, including bald eagles and loggerhead shrike, as well as numerous other animal and plant species. The only population of one rare plant, the White Bluffs bladder pod, occurs at the Hanford site. Under Richardson's plan, traditional Native American cultural uses of these sites will continue. The preserves will also continue to provide a safety buffer for DOE facilities. Despite these promising moves, the long-term viability of the management arrangements that have been established varies across the sites. For example, because of various constraints, the DOE agreement with the Tennessee Wildlife Resources Agency for management of the Three Bend Scenic and Wildlife Refuge on the Oak Ridge Reservation is for only five years, compared to the 25-year agreement with the U.S. Fish and Wildlife Service at Hanford. Further, some Oak Ridge city leaders have opposed establishing the refuge, because they want the land to be used for housing and industrial development. Pressure to develop these unique lands is likely to continue to mount. Although DOE is required to identify surplus property according to the terms of Executive Order 12512, we have asked that this process occur without compromising long-term research, conservation, and education opportunities, including possible new facilities. To date, we feel that these values have not been given adequate weight and have not been integrated into national environmental goals. We also believe that retaining the research parks is a cost-effective means of bolstering President Clinton's Lands Legacy Initiative. Research park lands near communities can serve as buffers against sprawl as well as offering nearby urban residents diverse educational and recreational opportunities, such as hiking, biking, hunting, and nature walks. We further recommend that DOE develop a long-term management plan for protecting opportunities for energy-related research, conservation, and education in the DOE research parks. This plan should include an outreach program specifying ways for the community, educators, and scientists to take advantage of the user facilities of the parks. For example, local science camps could be expanded to become national opportunities for students and educators to learn about energy use, conservation, and the environment. We envision that DOE's ''EcoCamps'' could be just as popular as NASA's Space Camps.

Dale, V.H.

2000-01-01T23:59:59.000Z

214

Habitat Evaluation Procedure (HEP) Report for the Pend Oreille Wetlands Wildlife II Project, Technical Report 2002.  

DOE Green Energy (OSTI)

The Habitat Evaluation Procedure (HEP), developed in 1980 by the U.S. Fish and Wildlife Service (USFWS 1980a, USFWS 1980b), uses a habitat/species based approach to assessing project impacts, and is a convenient tool to document the predicted effects of proposed management actions. The Northwest Power Planning Council (NPPC) endorsed the use of HEP in its Columbia River Basin Fish and Wildlife Program to evaluate wildlife benefits and impacts associated with the development and operation of the federal Columbia River Basin hydroelectric system (NPPC 1994). The Albeni Falls Interagency Work Group (AFIWG) used HEP in 1987 to evaluate wildlife habitat losses attributed to the Albeni Falls hydroelectric facility (Martin et al. 1988). In 1992, the AFIWG (Idaho Department of Fish and Game; Kalispel, Coeur d'Alene, and Kootenai Tribes) began implementing activities to mitigate these losses. Implementation activities include protecting, restoring and enhancing wildlife habitat. HEPs are used extensively within the NPPC's Columbia River Basin Fish and Wildlife Program. Wildlife managers use HEP to determine habitat lost from the construction of the federal hydroelectric projects and habitat gained through NPPC mitigation program. Habitat Suitability Index (HSI) models for each of the seven target species are used to determine habitat quality and quantity losses for representative habitat cover types for this project. Target species include Bald Eagle, black-capped chickadee, Canada goose, mallard, muskrat, white-tailed deer and yellow warbler. In 2002, a HEP team determined the habitat condition of the 164-acre Pend Oreille Wetlands Wildlife II Project (Figure 1). The HEP team consisted of the following members and agencies: Roy Finley, Kalispel Natural Resource Department (KNRD); Neil Lockwood, KNRD; Brian Merson, KNRD; Sonny Finley, KNRD; Darren Holmes, KNRD; Anna, Washington Dept. of Fish and Game (WDFW); and Scott, WDFW. Baseline Habitat Units (HU) will be credited to Bonneville Power Administration (BPA) for protection of habitats within the project area. The HSI models used were identical to those modified for use in 1991 (Appendix 2). The objective of using HEP as an assessment tool is two-fold. First, it provides an unbiased and measured assessment of wildlife habitats within the mitigation parcel. This data is used to offset the Albeni Falls Dam HU loss ledger. That ledger accounts for the loss of wildlife habitat that resulted from the construction and inundation of Albeni Falls hydroelectric project and the extent to which those losses have been mitigated. Additionally, the baseline HEP evaluation describes existing habitat conditions on the property and will be used, along with other tools, to determine initial management, restoration, and enhancement activities. HEP analyses will be completed every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional HU crediting to BPA for enhanced habitat values.

Holmes, Darren

2003-06-01T23:59:59.000Z

215

Habitat Evaluation Procedure (HEP) Report for the Pend Oreille Wetlands Wildlife Project, Technical Report 2002.  

DOE Green Energy (OSTI)

The Habitat Evaluation Procedure (HEP), developed in 1980 by the U.S. Fish and Wildlife Service (USFWS 1980a, USFWS 1980b), uses a habitat/species based approach to assessing project impacts, and is a convenient tool to document the predicted effects of proposed management actions. The Northwest Power Planning Council (NPPC) endorsed the use of HEP in its Columbia River Basin Fish and Wildlife Program to evaluate wildlife benefits and impacts associated with the development and operation of the federal Columbia River Basin hydroelectric system (NPPC 1994). The Albeni Falls Interagency Work Group (AFIWG) used HEP in 1987 to evaluate wildlife habitat losses attributed to the Albeni Falls hydroelectric facility (Martin et al. 1988). In 1992, the AFIWG (Idaho Department of Fish and Game; Kalispel, Coeur d'Alene, and Kootenai Tribes) began implementing activities to mitigate these losses. Implementation activities include protecting, restoring and enhancing wildlife habitat. HEPs are used extensively within the NPPC's Columbia River Basin Fish and Wildlife Program. Wildlife managers use HEP to determine habitat lost from the construction of the federal hydroelectric projects and habitat gained through NPPC mitigation program. Habitat Suitability Index (HSI) models for each of the seven target species are used to determine habitat quality and quantity losses for representative habitat cover types for this project. Target species include Bald Eagle, black-capped chickadee, Canada goose, mallard, muskrat, white-tailed deer and yellow warbler. In 2002, a HEP team determined the habitat condition of the 436-acre Pend Oreille Wetlands Wildlife Project (Figure 1). The HEP team consisted of the following members and agencies: Roy Finley, Kalispel Natural Resource Department (KNRD); Neil Lockwood, KNRD; Brian Merson, KNRD; Sonny Finley, KNRD; Darren Holmes, KNRD; Anna, Washington Dept. of Fish and Game (WDFW); and Scott, WDFW. Baseline Habitat Units (HU) will be credited to Bonneville Power Administration (BPA) for protection of habitats within the project area. The HSI models used were identical to those modified for use in 1991 (Attachment A). The objective of using HEP as an assessment tool is two-fold. First, it provides an unbiased and measured assessment of wildlife habitats within the mitigation parcel. This data is used to offset the Albeni Falls Dam HU loss ledger. That ledger accounts for the loss of wildlife habitat that resulted from the construction and inundation of Albeni Falls hydroelectric project and the extent to which those losses have been mitigated. Additionally, the baseline HEP evaluation describes existing habitat conditions on the property and will be used, along with other tools, to determine initial management, restoration, and enhancement activities. HEP analyses will be completed every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional HU crediting to BPA for enhanced habitat values.

Holmes, Darren

2003-05-01T23:59:59.000Z

216

Acknowledgements NATURE CURE AND NATURAL METHODS  

E-Print Network (OSTI)

of ecosystem health: Is the distribution of Martial Eagle nests in the Karoo, South Africa, influenced) breeding on electricity transmission pylons in the central and southwestern Karoo, South Africa distances, 7 km vs. 12 km, p ¼ 0:025). This study shows that (i) large eagle distributions in the Karoo

Sanyal, Sugata

217

Sediment facies classification of a sandy shoreline by means of airborne imaging spectroscopy  

Science Conference Proceedings (OSTI)

Airborne imaging spectroscopy data (AISA Eagle and HyMap) were applied to classify the sediments of a sandy beach in seven sand type classes. On the AISA-Eagle data, several classification strategies were tried out and compared with each other. The best ...

B. Deronde; P. Kempeneers; R. Houhuys; J. -P. Henriet; V. Van Lancker

2008-08-01T23:59:59.000Z

218

Research and Recovery of Snake River Sockeye Salmon, 1995-1996 Annual Report.  

DOE Green Energy (OSTI)

In 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. Initial steps to recover the species include the establishment of captive broodstocks at the Idaho Department of Fish and Game`s Eagle Fish Hatchery in Eagle, Idaho. Research and recovery activities for sockeye conducted by the Idaho Department of Fish and Game at the Eagle Fish Hatchery during the period April 1, 1995 to April 1, 1996 are covered by this report. The performance of all captive broodstock groups held at Eagle Fish Hatchery is included in this report. No anadromous adults returned to Redfish Lake in 1995. Three adult residual males were captured in a merwin trap and used in the spawning of captive residual females held at Eagle Fish Hatchery.

Pravecek, Jay J.

1997-07-01T23:59:59.000Z

219

Independent Statistics & Analysis Drilling Productivity Report  

U.S. Energy Information Administration (EIA) Indexed Site

Independent Statistics & Analysis Independent Statistics & Analysis Drilling Productivity Report The six regions analyzed in this report accounted for nearly 90% of domestic oil production growth and virtually all domestic natural gas production growth during 2011-12. December 2013 For key tight oil and shale gas regions U.S. Energy Information Administration Contents Year-over-year summary 2 Bakken 3 Eagle Ford 4 Haynesville 5 Marcellus 6 Niobrara 7 Permian 8 Explanatory notes 9 Sources 10 Bakken Marcellus Niobrara Haynesville Eagle Ford Permian U. S. Energy Information Administration | Drilling Productivity Report 0 400 800 1,200 1,600 2,000 Bakken Eagle Ford Haynesville

220

Energy Emergency Energy Emergency Preparedness Quarterly Preparedness Quarterly  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 A 2 A P R I L 1 5 , 2 0 1 2 U.S. DEPARTMENT OF ENERGY In January, OE's energy infrastructure monitoring capability was offically given the name Environment for Analysis of Geo-Located Energy Information (EAGLE-I). Through EAGLE-I, OE's Infrastructure Security and Energy Restoration (ISER) division has developed the capability to monitor the Nation's energy infrastructure in near real-time and to geospatially map energy assets and systems, tying together a variety of data sources into one visualization platform. EAGLE-I provides ISER staff with automated alert notifications when abnormal conditions are detected. Through e-mail, text

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The Passage of a Weak Thunderstorn Downburst over an Instrumented Tower  

Science Conference Proceedings (OSTI)

On 5 November 1977 a weak downburst associated with a multicell storm passed over an instrumented tower at Bald Hills, a suburb of Brisbane, Australia. Associated with the thunderstorm was a dome of cold air estimated to be 1200 to 1800 m deep. ...

Douglas J. Sherman

1987-06-01T23:59:59.000Z

222

RECOVERY OF THORIUM FROM A WYOMING ORE  

SciTech Connect

An investigation of Bald Mountain, Wyo. ore was conducted in which it was found that the monazite concentrate prepared from this conglomerate can be decomposed by the conventional sulfuric acid-cure treatment. The resultant acid leach liquor can be processed by primary amine solvent extraction to yield a 99% ThO/sub 2/ product. (J.R.D.)

Borrowman, S.R.; Rosenbaum, J.B.

1961-01-01T23:59:59.000Z

223

Wildlife-Salmonid Relationships Table F1. Wildlife species in the Yakima subbasin, Washington that eat  

E-Print Network (OSTI)

Rare Incubation - eggs and alevin Rare Carcasses Green-winged Teal Anas crecca Rare Incubation - eggs Indirect Incubation - eggs and alevin Red-tailed Hawk Buteo jamaicensis Rare Carcasses Golden Eagle Aquila

224

NCNR BT5-USANS Instrument Schedule D. Mildner Tel: (301) ...  

Science Conference Proceedings (OSTI)

... Dow Chem) Jun 14 6 L Anovitz(Tenn)+ D 17989 multiscale porosity in 6CB Mildner Cole(OSU)+ G U29-15 the Eagle Ford gas shale Rother(ORNL ...

225

NCNR NG3-SANS Instrument Schedule B. Hammouda Tel ...  

Science Conference Proceedings (OSTI)

... Star Polymers Jun 14 3 L Anovitz (Oak 17954 Multiscale Porosity in 9P Mildner Ridge)+D Cole+ A S29-49 the Eagle Ford Gas Shale Swift (Ohio ...

226

Alternative Fuels Data Center: Heavy-Duty Vehicle and Engine...  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

CrosswindEaglePelican Applications: Street sweeper, Vocational truck Fuel Types: CNG, LNG, Propane Power Source(s): Cummins Westport - ISL G 8.9L Ford Motor Co. - 2.5L Propane...

227

Figure 97. Total U.S. tight oil production by geologic formation ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 97. Total U.S. tight oil production by geologic formation, 2011-2040 (million barrels per day) Permian Basin Bakken Eagle Ford

228

U. S. Energy Information Administration | Drilling Productivity...  

U.S. Energy Information Administration (EIA) Indexed Site

2007 2008 2009 2010 2011 2012 2013 Oil production thousand barrelsday Eagle Ford 0 50 100 Oct 1,069 Mbbld Production from new wells Legacy production change Net change Nov 1,093...

229

Isotopes of helium, hydrogen, and carbon as groundwater tracers in aquifers along the Colorado River  

E-Print Network (OSTI)

Survey Data Series. Google.com Maps, 2009 Ground Water Atlasand Yuma highlighted. (Google.com) NEEDLES Eagle Peak 2 kmto furthest from river. (Google.com) BLYTHE 5km Figure 6:

Haber, Samuel Ainsworth

2009-01-01T23:59:59.000Z

230

Birds' Nests  

NLE Websites -- All DOE Office Websites (Extended Search)

are pressed into place and reinforced with blades of dead grass. With the exception of eagles and certain hawks it is one of the few birds that uses the same nest more than one...

231

TMS Foundation Focus, 4 (1): Torrey Pines Golf Course Hosts ...  

Science Conference Proceedings (OSTI)

... participants were given the experience of playing the course in much the same condition that saw Tiger Woods seal his victory with an eagle on the 18th hole.

232

Bird Beaks and Feet  

NLE Websites -- All DOE Office Websites (Extended Search)

a bird gives a good clue to its feeding habits. Carnivorous birds like hawks, owls and eagles have strong hooked beaks for tearing flesh. Herons, egrets and kingfishers, with their...

233

Eyes of Animals  

NLE Websites -- All DOE Office Websites (Extended Search)

"simple" eyes for close vision. Birds have the keenest eyes and those of the hawks, eagles and vultures can see small objects at incredible distances. By their eyes ye shall...

234

Schedule of Events  

Science Conference Proceedings (OSTI)

2 to 6 p.m.. Registration. Cliff Lodge, Ballroom Lobby. 6 to 7 p.m.. Welcome Reception. Cliff Lodge, Golden Cliff/Eagle's Nest. Monday, August 15. 7 a.m. to 5 p.m..

235

Large Owls  

NLE Websites -- All DOE Office Websites (Extended Search)

"ear" tufts. The nest is usually a remodeled hawk or owl's nest, but they even drive eagles from their eyries and take over. The food is extremely varied; mostly mice, rabbits...

236

Northwest McGregor Oil Field in Williams County, North Dakota...  

NLE Websites -- All DOE Office Websites (Extended Search)

collaborated with Eagle Operating, Inc. to complete the test in the Northwest McGregor Oil Field in Williams County, North Dakota. The "huff-and-puff" EOR method consists of three...

237

Large-scale semidefinite programs in electronic structure calculation  

E-Print Network (OSTI)

National Energy Research Scientific Computing Center (NERSC), and eagle (4 375MHz. Power3-II with level two cache of size 8MB, and 2GB of memory per...

238

CX-010444: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination Technology Integration Program - Field Trial Site Two - Eagle Ford Shale, DeWitt County, Texas CX(s) Applied: A9, B3.1, B3.6 Date: 06192013 Location(s):...

239

CX-010194: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Integration Program Phase II Field Trial: Site One - Eagle Ford Shale CX(s) Applied: B3.11 Date: 04152013 Location(s): Texas Offices(s): National Energy...

240

Categorical Exclusion Determinations: Advanced Technology Vehicles...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 CX-007677: Categorical Exclusion Determination Project Eagle Phase 1 Direct WaferCell Solar Facility CX(s) Applied: B1.31 Date: 01242012 Location(s): Massachusetts...

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Flycatchers  

NLE Websites -- All DOE Office Websites (Extended Search)

a crow, a hawk, or even an eagle. We saw one, with its nest in an apple tree, attack a dog and, another time, the hat of a man passing underneath. The Eastern Phoebe has almost...

242

NETL F 451.1/1-1, Categorical Exclusion Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DT0003144 NETL SOD FE Eagle Design SOD 2012 210 days David A. Schmidt NETL: South Park Twp, PA B94 Hazardous Gas Alarms Providing gas alarm monitoring sensing systems into Labs...

243

CX-000012: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination CX-000012: Categorical Exclusion Determination Eagle Junction Clearwire Wireless Communication Facilities CX(s) Applied: B1.7, B1.15, B1.19 Date: 12022009...

244

career services Gordon Hall, 74 Union Street 613 533 2992 careers.queensu.ca  

E-Print Network (OSTI)

.aecon.com Agnico-Eagle Mines www.agnico-eagle.com Alberici www.alberici.com/ Aversan Inc. www.aversan.com BRP www.prairiefyre.com Proctor & Gamble http://www.pg.com/en_CA/index.shtml Sherritt Coal www.sherritt.com Schlumberger.spartancontrols.com Statoil Canada Ltd. www.statoil.com StonCor Group www.stoncor.ca Teck Coal Ltd. www.teck.com Trane www

Graham, Nick

245

Microsoft Word - BHF_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Dorie Welch Project Manager - KEWM-4 Proposed Action: Bald Hill Farms property funding Fish and Wildlife Project No.: 2011-003-00, BPA-007071 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Real Property transfers for cultural protection, habitat preservation, and wildlife management. Location: Corvallis quadrangle, in Benton County, Oregon (near Corvallis, Oregon). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to fund the Greenbelt Land Trust's purchase of the Bald Hill Farms property (Property), a 483-acre parcel of land located just west of the City of

246

U. S. Energy Information Administration | Drilling Productivity Report  

U.S. Energy Information Administration (EIA) Indexed Site

400 400 800 1,200 1,600 2,000 Bakken Eagle Ford Haynesville Marcellus Niobrara Permian January-2013 January-2014 Oil production thousand barrels/day 0 2,000 4,000 6,000 8,000 10,000 12,000 Bakken Eagle Ford Haynesville Marcellus Niobrara Permian January-2013 January-2014 Natural gas production million cubic feet/day 0 250 500 750 1,000 Bakken Eagle Ford Haynesville Marcellus Niobrara Permian January-2013 January-2014 New-well oil production per rig barrels/day 0 1,000 2,000 3,000 4,000 5,000 6,000 Bakken Eagle Ford Haynesville Marcellus Niobrara Permian January-2013 January-2014 New-well gas production per rig thousand cubic feet/day (450) (400) (350) (300) (250) (200) (150) (100) (50) 0 Bakken Eagle Ford Haynesville Marcellus Niobrara Permian January-2013 January-2014 Legacy gas production change million cubic feet/day

247

U.S. Department of Energy Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Grant for the City of Carlsbad Improvement of the Double Eagle Well Field Department of Energy Grant for the City of Carlsbad Improvement of the Double Eagle Well Field Carlsbad Field Office Carlsbad, Eddy and Lea Counties, NM The City of Carlsbad owns and operates two separate ground water well fields that serve a broad range of users including residential, industrial, commercial, and agricultural customers. The Sheeps Draw Well Field currently serves as the primary source of water for the City, however the City is seeking to expand the Double Eagle system to offset the high demands and depletion of the Sheep Draw Well Field. The City has a total of 42 wells permitted by the New Mexico State Engineer in the Double Eagle Well Field. Of the 42 wells, 14 have not been drilled, and of the remaining 28 existing wells, 18 are currently operational. As the water wells are an integral part of the Double Eagle System, the City is

248

CX-002861: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Categorical Exclusion Determination 61: Categorical Exclusion Determination CX-002861: Categorical Exclusion Determination Developing High-Resolution Spatial Data of Migration Corridors for Avian Species of Concern in Regions of High Potential Wind Development CX(s) Applied: A9 Date: 07/02/2010 Location(s): Pittsburgh, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The National Aviary of Pittsburgh proposes to use federal funding to research wind turbine impacts on Golden Eagles. They will observe site specific behavior patterns and determine if Golden Eagle flight patterns can be predicted with landscape features. This data can then be analyzed and plugged into a GIS (geographic information system) computer modeling system to determine where and when eagle populations migrate through the

249

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

601 - 3610 of 26,777 results. 601 - 3610 of 26,777 results. Page EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.) http://energy.gov/nepa/eis-0471-department-energy-loan-guarantee-support-proposed-eagle-rock-enrichment-facility Download CX-000579: Categorical Exclusion Determination Site Characterization for Strategically Hardened Facility Defeat Project (Socorro, New Mexico) CX(s) Applied: B3.1 Date: 12/04/2009

250

Leading the Charge: Tribal Women in Power | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Women in Power Tribal Women in Power Leading the Charge: Tribal Women in Power October 22, 2012 - 4:19pm Addthis Andrea Alexander, Makah Tribe in Neah Bay (Washington)/Affiliated Tribes of Northwest Indians Andrea Alexander, Makah Tribe in Neah Bay (Washington)/Affiliated Tribes of Northwest Indians Kathy Mayo, Eagle Village in Upper Yukon (Alaska)/Tanana Chiefs Conference Kathy Mayo, Eagle Village in Upper Yukon (Alaska)/Tanana Chiefs Conference Tara Hess-McGeown, Washoe Tribe of Nevada and California/Intertribal Council of Nevada Tara Hess-McGeown, Washoe Tribe of Nevada and California/Intertribal Council of Nevada Andrea Alexander, Makah Tribe in Neah Bay (Washington)/Affiliated Tribes of Northwest Indians Kathy Mayo, Eagle Village in Upper Yukon (Alaska)/Tanana Chiefs Conference

251

NETL: Gasifipedia  

NLE Websites -- All DOE Office Websites (Extended Search)

EAGLE EAGLE EAGLE, an acronym that stands for Energy Application for Gas, Liquid, and Electricity, is a project funded by the Electric Power Development Company of Japan, in collaboration with Japan's New Energy and Industrial Technology Development Organization (NEDO). The project goal is to develop a Japanese-built, oxygen-blown, entrained-flow coal gasifier, suitable for multipurpose applications, including the generation of electric power and production of synthetic fuels, chemicals, and hydrogen. The project started in 1995 with feasibility studies and a 150-ton-per-day (tpd) pilot plant was constructed in 2001. Demonstration testing commenced in 2002 and is still in progress. Recent testing includes the evaluation of various coal feedstocks and carbon dioxide (CO2) capture.

252

CX-003512: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

512: Categorical Exclusion Determination 512: Categorical Exclusion Determination CX-003512: Categorical Exclusion Determination Resort Communities Retrofit Program CX(s) Applied: A1, A9, A11, B5.1 Date: 07/09/2010 Location(s): Eagle, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Eagle County, Colorado will use the Department of Energy (DOE) funding under the Competitive Energy Efficiency and Conservation Block Grant Award to achieve a minimum of 20% energy savings in 10% of existing residences in Eagle, Pitkin and Gunnson Counties in Colorado. The collaborative will provide education and marketing, energy audits, energy resource centers, a revolving loan fund complimenting each county's Energy Smart Property Assessed Clean Energy (PACE) program, and comprehensive data tracking,

253

pocforms06a0399.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Return Copy to: Bank of Return Copy to: Bank of America Government Card Services Unit P.O. Box 1637 Norfolk, VA 23501-1637 Facsimile: 757.624.6323 Toll Free Fax: 877.217.1033 Form: S06A0399 Revised: 05/17/99 Point of Contact Information Use this form to update point of contact information and/or establish EAGLS access for Agency/Organization Program Coordinators (A/OPCs), Transaction Dispute Offices (TDOs), Designated Billing Offices (DBOs) / Payment Offices, and EC/EDI coordinators. To delete EAGLS access, please use the EAGLS Access Application Form. Questions? Call GCSU toll-free (1.800.472.1424) from the US and Canada or, if dialing from international locations, call collect (1.757.441.4124). Add Modify Delete Hierarchy Level: Please list unit name and the seven (7) digit number associated with each level of the organization's

254

Microsoft Word - JAS-WillistonBasin-Oct09  

NLE Websites -- All DOE Office Websites (Extended Search)

EOR Field Test EOR Field Test 1 FACT SHEET FOR PARTNERSHIP FIELD VALIDATION TEST Partnership Name Plains CO 2 Reduction (PCOR) Partnership - Phase II Contacts: DOE/NETL Project Mgr. Name Organization E-Mail Andrea McNemar, U.S. Department of Energy, andrea.mcnemar@netl.doe.gov Principal Investigator Edward Steadman Field Test Information: Field Test Name Williston Basin EOR Field Test Test Location Northwest McGregor Oil Field, Williams County, North Dakota Amount and Source of CO 2 Tons 440 tons Source Commercial vendor Field Test Partners (Primary Sponsors) Eagle Operating, Inc. Schlumberger Carbon Services Praxair Summary of Field Test Site and Operations: The Plains CO 2 Reduction (PCOR) Partnership, working closely with Eagle Operating, Inc. (Eagle), has

255

AAllaasskkaa NNaattiivvee--SSeerrvviinngg aanndd NNaattiivvee HHaawwaaiiiiaann--SSeerrvviinngg IInnssttiittuuttiioonnss  

E-Print Network (OSTI)

................................................................................................................19 Veterinary Science Program, Interior Aleutians and Chukchi Campuses, U of Alaska Fairbanks Eagle to Unalaska (Interior-Aleutians Campus) in cooperation with the UAF-based Cooperative Extension Management (Northwest Campus), Ethnobotany (Kuskokwim Campus) and Veterinary Science (Chukchi and Interior-Aleutians

256

DOE Uranium Leasing Program - Lease Tract Metrics  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Leasing Program -- Lease Tract Metrics Uranium Leasing Program -- Lease Tract Metrics Lease Tract Lessee Lease Date Bid (%) Reclamation Bond a Total Acres Acres Excluded b Comment C-JD-5 Gold Eagle Mining, Inc. 04/30/08 12.00 37,000 150.71 C-JD-5A Golden Eagle Uranium, LLC 06/27/08 20.10 5,000 24.54 C-JD-6 Cotter Corporation 04/30/08 14.20 19,000 530.08 C-JD-7 c Cotter Corporation 04/30/08 27.30 1,206,000 493.01 C-JD-8 Cotter Corporation 04/30/08 36.20 4,000 954.62 C-JD-8A No bids received - remains inactive N/A N/A N/A 77.91 C-JD-9 Cotter Corporation 04/30/08 24.30 72,000 1,036.50 C-SR-10 Golden Eagle Uranium, LLC 06/27/08 13.10 5,000 637.64 C-SR-11 Cotter Corporation 04/30/08 11.67 43,000 1,303.22 200.25 Summit Canyon area excluded from lease tract C-SR-11A Golden Eagle Uranium, LLC 06/27/08 14.30 5,000 1,296.81 C-SR-12 Colorado Plateau Partners 06/27/08

257

POSTGRADUATE MONTEREY, CALIFORNIA  

E-Print Network (OSTI)

#12;REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704­0188 The public reporting burden YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD­MM­YYYY) 2. REPORT TYPE 3. DATES COVERED (From -- To. Eagle Approved for public release; distribution is unlimited #12;THIS PAGE INTENTIONALLY LEFT BLANK ii

258

Research and Recovery of Snake River Sockeye Salmon, 1994-1995 Annual Report.  

DOE Green Energy (OSTI)

In 1991, the National Marine Fisheries Service (NMFS) listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. Initial steps to recover the species include the establishment of captive broodstocks at the Idaho Department of Fish and Game (IDFG) Eagle Fish Hatchery in Eagle, Idaho. Research and recovery activities for sockeye salmon conducted by IDFG during the period of April 1994 to April 1995 are covered by this report. One female anadromous adult returned to the Redfish Lake Creek trap this year. She was spawned at Eagle Fish Hatchery on October 21, 1994. Her fecundity was 2,896. The mean fertilization rate and percent swim-up were 96% and 95%, respectively. Four hundred eighty eyed eggs were shipped to the NMFS Big Beef Creek Fish Hatchery in Washington state, leaving 2,028 fish on site at Eagle. Additionally, captive broodstock and wild residual sockeye salmon (captured at Redfish Lake) were spawned. Spawning data from 234 females spawned during this period are included in this report. Other spawning data (i.e., genetic cross and incubation temperature) are included in the Captive Broodstock Research section of this report.

Johnson, Keith A.

1996-09-01T23:59:59.000Z

259

Mining into the new millennium  

Science Conference Proceedings (OSTI)

After more than 3 years of production and a billion tons of coal shipped, Foundation Coal West, a subsidiary of Foundation Coal Holding Inc., continues to operate two of the original surface mines in Wyoming's Powder River Basin. The article describes equipment (conveyors, trucks, surface miners etc.) deployed at Belle Ayr and Eagle Butte PRB operations. 3 photos.

Buchsbaum, L.

2009-06-15T23:59:59.000Z

260

Identification and Characterization of Near-Term  

E-Print Network (OSTI)

Corp. Texas Instruments DALGlobal Services NACCO Materials Handling Group Inc. DTE Energy Marzetti Transbotics, Inc Giant Eagle BHP Billiton - San Juan Coal Co. Nilfisk-Advance Children's Hospital Meijer Columbia ParCar Corp. Mittal Steel (Slab Product Plant) Limited Brands Inc. The Toro Company (Commercial

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Stephen C. Ruppel Principal Investigator  

E-Print Network (OSTI)

in mudrocks (gas shale) characterization and research ·Research integrates a wide spectrum of disciplines ranging from sedimentology to gas chemistry to fractures to fluid flow. ·Researchers include geoscientists Shale, Texas, Louisiana ·Eagle Ford Shale, South Texas ·Pearsall Shale, Gulf Coast Basin ·Bakken Shale

Texas at Austin, University of

262

Between the Basins: Exploring the Western Mojave and  

E-Print Network (OSTI)

, California 92507 April 2002 #12;2 Front Cover. View west of the Trona Pinnacles. Back Cover. View south across the salt flats of Searles Lake. The Trona Pinnacles are in mid-ground; Pilot Knob been deposited in late Pleistocene time (Monastero and others, View east from Trona Road of the Eagle

de Lijser, Peter

263

First Name Last Name Parish/School System Michelle Adkins St. Charles  

E-Print Network (OSTI)

Union Jennifer Beall Beauregard Mary Bissell Caddo Jordan Blachier Lincoln Susan Blankenbaker Beauregard Cole Lafourche Cody Cole Beauregard Jodi Cole Sabine Walter Cole Bossier Connie Conner Beauregard. Landry Andrew Duplechin Beauregard Darren Eady Orleans Amanda Eagle Bossier Reginald Edwrds Caddo Ashley

Harms, Kyle E.

264

Energy Storage: Current landscape for alternative energy  

E-Print Network (OSTI)

Energy Storage: Current landscape for alternative energy storage technologies and what the future may hold for multi-scale storage applications Presented by: Dave Lucero, Director Alternative Energy · Industry initiatives · Technology · Energy Storage Market · EaglePicher initiatives · Summary #12

265

2001: Surface estimation based on LIDAR  

E-Print Network (OSTI)

In the past several years, the use of airborne laser systems or LIDAR for the rapid collection of digital terrain models (DTMs) has proliferated. Flood plain studies, contouring, road engineering projects, volumetric computations, ortho-photo production, and mapping for beach erosion are just some of the applications driving the demand for this technology. The ability of LIDAR systems to capture accurate spot heights at an extremely rapid rate is the principle reason behind LIDAR's success. Many applications, for example, contouring, require a bald-earth DTM. Unfortunately, the raw data points captured by LIDAR do not constitute a bald-earth DTM. Even though most LIDAR systems can measure "lastreturn" data points, these "last-return " points often measure ground clutter like shrubbery, cars, buildings, and even the canopy of dense foliage. Consequently, raw LIDAR points must be post-processed to remove these undesirable returns. The degree to which this post processing is successful is critical in determining whether LIDAR is cost effective for large-scale mapping applications. We present our approach to estimating bald-earth surfaces from LIDAR data. Our approach is different from typical approaches in that we estimate a surface based on the original LIDAR points while at the same time considering important supplementary information. This other information includes independently measured breaklines and surface categories. We use a least-squares adjustment with robust estimation similar to that proposed by (Kraus, Pfeifer, 1998). The surface model is represented using a triangular irregular network or TIN. We present examples from a real mapping project that demonstrate the success of this approach.

Wolfgang Schickler; Anthony Thorpe

2001-01-01T23:59:59.000Z

266

Property:ProjectType | Open Energy Information  

Open Energy Info (EERE)

ProjectType ProjectType Jump to: navigation, search Property Name ProjectType Property Type Page Description A descriptive type for a project. This property uses pages as for its values, each of which should describe the type in detail. Pages using the property "ProjectType" Showing 25 pages using this property. (previous 25) (next 25) A Akutan Geothermal Project + Hydrothermal System + Alligator Geothermal Geothermal Project + Hydrothermal System + Alum Geothermal Project + Hydrothermal System + Aurora Geothermal Project + Hydrothermal System + B Bald Mountain Geothermal Project + Hydrothermal System + Baltazor Springs Geothermal Project + Hydrothermal System + Barren Hills Geothermal Project + Hydrothermal System + Black Rock I Geothermal Project + Hydrothermal System +

267

Property:County | Open Energy Information  

Open Energy Info (EERE)

County County Jump to: navigation, search Property Name County Property Type String Description County Name Pages using the property "County" Showing 25 pages using this property. (previous 25) (next 25) A Akutan Geothermal Project + Aleutians East Borough, AK + Alligator Geothermal Geothermal Project + White Pine County, NV + Alum Geothermal Project + Esmerelda County, NV + Aurora Geothermal Project + Mineral County, NV + B Bald Mountain Geothermal Project + Lassen County, CA + Baltazor Springs Geothermal Project + Humboldt County, NV + Barren Hills Geothermal Project + Lyon, NV + Black Rock I Geothermal Project + Imperial County, OR + Black Rock II Geothermal Project + Imperial County, CA + Black Rock III Geothermal Project + Imperial County, CA +

268

Economics of large-scale thorium oxide production: assessment of domestic resources  

SciTech Connect

The supply curve illustrates that sufficient amounts of thorium exist supply a domestic thorium-reactor economy. Most likely costs of production range from $3 to $60/lb ThO/sub 2/. Near-term thorium oxide resources include the stockpiles in Ohio, Maryland, and Tennessee and the thorite deposits at Hall Mountain, Idaho. Costs are under $10/lb thorium oxide. Longer term economic deposits include Wet Mountain, Colorado; Lemhi Pass, Idaho; and Palmer, Michigan. Most likely costs are under $20/lb thorium oxide. Long-term deposits include Bald Mountain, Wyoming; Bear Lodge, Wyoming; and Conway, New Hampshire. Costs approximately equal or exceed $50/lb thorium oxide.

Young, J.K.; Bloomster, C.H.; Enderlin, W.I.; Morgenstern, M.H.; Ballinger, M.Y.; Drost, M.K.; Weakley, S.A.

1980-02-01T23:59:59.000Z

269

Beamline 9.0.2  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Print 2 Print Chemical Dynamics Scientific disciplines: Chemical dynamics, aerosol chemistry, imaging mass spectrometry, chemical kinetics, laser ablation and clusters, combustion and flames. Endstations: Molecular-beam photoelectron/photoion imaging and spectroscopy Flame chamber Ablation chamber Aerosol chamber Kinetics chamber GENERAL BEAMLINE INFORMATION Operational Yes Source characteristics 10-cm period undulator (U10) (fundamental) Energy range 7.4-30 eV Undulator beam White beam (straight undulator beam) Calculated flux (1.9 GeV, 400 mA) 1016 photons/s, 2.5%BW Spot size at sample 170 (h) x 50 (v) µm Monochromator #1 3-m Off-plane Eagle Calculated flux (1.9 GeV, 400 mA) 1014 photons/s, 0.1%BW Spot size at sample 400 (h) x 350 (v) µm Monochromator #2 3-m Off-plane Eagle

270

Environmental Impact Statements and Environmental Assessments Status Chart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 3, 2011 June 3, 2011 EIS-0435: EPA Notice of Availability of the Final Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota May 23, 2011 EIS-0460: Notice of Intent to Prepare an Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois May 20, 2011 EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH April 29, 2011 EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental

271

U.S. Department of Energy Office of Legacy Management National Envkonmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- - 19-10 U.S. Department of Energy Office of Legacy Management National Envkonmental Policy Act Environmental Checklist Project/Activity: Drill one exploratory hole on L.T. c-WM-17 by Golden Eagle Uranium A. Brief Project! Activity Descl'iptioll Golden Eagle Uranium (LLC) proposes to drill one 5-inch-diameter exploratory borehole on U.S. Department of Energy (DOE) lease tract C-WM-17, located in western Montrose County, Colorado. The drilling would be completed by a truck-mounted rotary drill rig capable of boring to 1,000 feet (ft) below ground surface (bgs). The proposed location of the drill hole is in a previously disturbed area and is adjacent to a two-track dirt road. Access to the site would be on existing dirt roads. The drilling would be completed dry to an estimated depth of 550 ft bgs. Once data are collected, the hole

272

Beamline 9.0.2  

NLE Websites -- All DOE Office Websites (Extended Search)

9.0.2 Print 9.0.2 Print Chemical Dynamics Scientific disciplines: Chemical dynamics, aerosol chemistry, imaging mass spectrometry, chemical kinetics, laser ablation and clusters, combustion and flames. Endstations: Molecular-beam photoelectron/photoion imaging and spectroscopy Flame chamber Ablation chamber Aerosol chamber Kinetics chamber GENERAL BEAMLINE INFORMATION Operational Yes Source characteristics 10-cm period undulator (U10) (fundamental) Energy range 7.4-30 eV Undulator beam White beam (straight undulator beam) Calculated flux (1.9 GeV, 400 mA) 1016 photons/s, 2.5%BW Spot size at sample 170 (h) x 50 (v) µm Monochromator #1 3-m Off-plane Eagle Calculated flux (1.9 GeV, 400 mA) 1014 photons/s, 0.1%BW Spot size at sample 400 (h) x 350 (v) µm Monochromator #2 3-m Off-plane Eagle

273

CX-006383: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

83: Categorical Exclusion Determination 83: Categorical Exclusion Determination CX-006383: Categorical Exclusion Determination Project Eagle Direct Water Manufacturing Plants CX(s) Applied: B1.23, B1.31 Date: 07/28/2011 Location(s): Lexington, Massachusetts Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office The Department of Energy proposed action is to issue a loan guarantee to 1366 Technologies for Project Eagle, which includes retrofitting and re-equipping two existing facilities to produce standard multicrystalline silicon wafers for solar cells using 1366's proprietary Direct Wafer manufacturing process. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006383.pdf More Documents & Publications CX-007677: Categorical Exclusion Determination CX-008551: Categorical Exclusion Determination

274

Areva_EREF_DOE-EIS-0471.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Impact Statement for the Proposed Areva Eagle Rock Enrichment Facility Bonneville County, Idaho Final Environmental Impact Statement U.S. Nuclear Regulatory Commission NUREG-1945, Adopted as DOE/EIS-0471 U.S. Department of Energy May 2011 Environmental Impact Statement for the Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho Final Report Chapters 1 through 10 Office of Federal and State Materials and Environmental Management Programs NUREG-1945, Vol. 1 AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC=s Public Electronic Reading Room at http://www.nrc.gov/reading-rm.html.

275

Beamline 9.0.2  

NLE Websites -- All DOE Office Websites (Extended Search)

9.0.2 Print 9.0.2 Print Chemical Dynamics Scientific disciplines: Chemical dynamics, aerosol chemistry, imaging mass spectrometry, chemical kinetics, laser ablation and clusters, combustion and flames. Endstations: Molecular-beam photoelectron/photoion imaging and spectroscopy Flame chamber Ablation chamber Aerosol chamber Kinetics chamber GENERAL BEAMLINE INFORMATION Operational Yes Source characteristics 10-cm period undulator (U10) (fundamental) Energy range 7.4-30 eV Undulator beam White beam (straight undulator beam) Calculated flux (1.9 GeV, 400 mA) 1016 photons/s, 2.5%BW Spot size at sample 170 (h) x 50 (v) µm Monochromator #1 3-m Off-plane Eagle Calculated flux (1.9 GeV, 400 mA) 1014 photons/s, 0.1%BW Spot size at sample 400 (h) x 350 (v) µm Monochromator #2 3-m Off-plane Eagle

276

CX-007677: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

77: Categorical Exclusion Determination 77: Categorical Exclusion Determination CX-007677: Categorical Exclusion Determination Project Eagle Phase 1 Direct Wafer/Cell Solar Facility CX(s) Applied: B1.31 Date: 01/24/2012 Location(s): Massachusetts Offices(s): Advanced Technology Vehicles Manufacturing Loan Program The Department of Energy (DOE) proposed action is for the use of a federal loan guarantee by 1366 Technologies (1366) to support the renovation of an existing building, located at 159 Wells Avenue, Newton, Massachusetts, into a solar wafer production facility. The new facility would constitute Phase 1 of Project Eagle and accommodate 20 megawatts (MW) of multi crystalline silicon wafer production, laboratory areas, offices, and ancillary spaces. CX-007677.pdf More Documents & Publications

277

CX-002692: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

692: Categorical Exclusion Determination 692: Categorical Exclusion Determination CX-002692: Categorical Exclusion Determination Drill One Exploratory Hole On Lease Tract C-WM-17 by Golden Eagle Uranium CX(s) Applied: B3.1, B1.3 Date: 06/02/2010 Location(s): Montrose County, Colorado Office(s): Legacy Management Golden Eagle Uranium (LLC) proposes to drill one 5-inch-diameter exploratory borehole on U.S. Department of Energy (DOE) lease tract C-WM-17, located in western Montrose County, Colorado. The drilling would be completed by a truck-mounted rotary drill rig capable of boring to 1,000 feet (ft) below ground surface (bgs). The proposed location of the drill hole is in a previously disturbed area and is adjacent to a two-track dirt road. Access to the site would be on existing dirt roads. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

278

CX-006591: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

591: Categorical Exclusion Determination 591: Categorical Exclusion Determination CX-006591: Categorical Exclusion Determination Invasive Species Removal and Reclamation in Gold Eagle Mining, Incorporated CX(s) Applied: B1.3, B1.20 Date: 08/24/2011 Location(s): San Miguel County, Colorado Office(s): Legacy Management The Department of Energy proposes to allow Gold Eagle Mining, Incorporated (GEMI), to exchange royalties due on three lease tracts for in-kind service. Employees of or contractors to GEMI would remove tamarisk and other invasive species along a 3.5-mile segment of the Dolores River that traverses one of their lease tracts. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006591.pdf More Documents & Publications EIS-0472: Draft Programmatic Environmental Impact Statement EA-1037: Final Environmental Assessment

279

Beamline 9.0.2  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Print 2 Print Chemical Dynamics Scientific disciplines: Chemical dynamics, aerosol chemistry, imaging mass spectrometry, chemical kinetics, laser ablation and clusters, combustion and flames. Endstations: Molecular-beam photoelectron/photoion imaging and spectroscopy Flame chamber Ablation chamber Aerosol chamber Kinetics chamber GENERAL BEAMLINE INFORMATION Operational Yes Source characteristics 10-cm period undulator (U10) (fundamental) Energy range 7.4-30 eV Undulator beam White beam (straight undulator beam) Calculated flux (1.9 GeV, 400 mA) 1016 photons/s, 2.5%BW Spot size at sample 170 (h) x 50 (v) µm Monochromator #1 3-m Off-plane Eagle Calculated flux (1.9 GeV, 400 mA) 1014 photons/s, 0.1%BW Spot size at sample 400 (h) x 350 (v) µm Monochromator #2 3-m Off-plane Eagle

280

EA-1905: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) For more information, contact: Ms. Susan E. McCauslin NEPA Compliance Officer Carlsbad Field Office U.S. Department of Energy P.O. Box 3090 Carlsbad, NM 88221 Telephone: 575-234-7349 Electronic mail: susan.mccauslin@wipp.ws The DOE CBFO is adopting an Environmental Assessment (EA) prepared by the U.S. Department of Interior Bureau of Land Management (BLM) Carlsbad Field Office for the expansion and upgrade of the City of Carlsbad's Double Eagle Water System. The City of Carlsbad has requested authority to spend funding from an existing CBFO infrastructure improvement grant to support the expansion and upgrade of this water. The City of Carlsbad currently

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

WIPP Documents - National Environmental Policy Act (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System DOE/EA-1905 October 2011 This document examines the potential environmental impacts associated with providing DOE funding for the proposed improvements to the City of Carlsbad Double Eagle Water System Amendment to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic Waste This Federal Register Notice relates to DOE sending contact-handled and remote-handled transuranic waste from certain generator sites as needed to the Idaho National Laboratory to be treated and characterized prior to shipment to the Waste Isolation Pilot Plant for disposal. Environmental Assessment for Actinide Chemistry and Repository Science Laboratory

282

Beamline 9.0.2  

NLE Websites -- All DOE Office Websites (Extended Search)

9.0.2 Print 9.0.2 Print Chemical Dynamics Scientific disciplines: Chemical dynamics, aerosol chemistry, imaging mass spectrometry, chemical kinetics, laser ablation and clusters, combustion and flames. Endstations: Molecular-beam photoelectron/photoion imaging and spectroscopy Flame chamber Ablation chamber Aerosol chamber Kinetics chamber GENERAL BEAMLINE INFORMATION Operational Yes Source characteristics 10-cm period undulator (U10) (fundamental) Energy range 7.4-30 eV Undulator beam White beam (straight undulator beam) Calculated flux (1.9 GeV, 400 mA) 1016 photons/s, 2.5%BW Spot size at sample 170 (h) x 50 (v) µm Monochromator #1 3-m Off-plane Eagle Calculated flux (1.9 GeV, 400 mA) 1014 photons/s, 0.1%BW Spot size at sample 400 (h) x 350 (v) µm Monochromator #2 3-m Off-plane Eagle

283

CX-002757: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Categorical Exclusion Determination 57: Categorical Exclusion Determination CX-002757: Categorical Exclusion Determination Drill One Exploratory Borehole on Lease Tract 15A by Golden Eagle Uranium CX(s) Applied: B3.1, B1.3 Date: 06/15/2010 Location(s): San Miguel County, Colorado Office(s): Legacy Management Golden Eagle Uranium LLC proposes to drill one 5-inch diameter exploratory borehole on United States Department of Energy lease tract C-SR-15A, located in western San Miguel County, Colorado. The drilling would be completed by a truck-mounted rotary drill rig capable of boring to 1,000 feet below ground surface. The drilling would be completed dry to an estimated depth of 600 feet below ground surface. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002757.pdf More Documents & Publications CX-000283: Categorical Exclusion Determination

284

CX-010101: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01: Categorical Exclusion Determination 01: Categorical Exclusion Determination CX-010101: Categorical Exclusion Determination Department of Energy Grant for the City of Carlsbad Improvement of the Double Eagle Well Field CX(s) Applied: A9, B1.7, B1.18 Date: 02/05/2013 Location(s): New Mexico Offices(s): Carlsbad Field Office The City of Carlsbad owns and operates two separate ground water well fields that serve a broad range of users including residential, industrial, commercial, and agricultural customers. The Sheeps Draw Well Field currently serves as the primary source of water for the City, however the City is seeking to expand the Double Eagle system to offset the high demands and depletion of the Sheep Draw Well Field. CX-010101.pdf More Documents & Publications CX-010102: Categorical Exclusion Determination

285

File:EIA-shaleusa9.pdf | Open Energy Information  

Open Energy Info (EERE)

shaleusa9.pdf shaleusa9.pdf Jump to: navigation, search File File history File usage Eagle Ford Shale Play, Western Gulf Basin, South Texas Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 379 KB, MIME type: application/pdf) Description Eagle Ford Shale Play, Western Gulf Basin, South Texas Sources Energy Information Administration Related Technologies Natural Gas Creation Date 2010-10-06 Extent Regional Countries United States UN Region Northern America States Texas File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 18:43, 20 December 2010 Thumbnail for version as of 18:43, 20 December 2010 1,650 × 1,275 (379 KB) MapBot (Talk | contribs) Automated bot upload

286

Photofission-Based, Nuclear Material Detection: Technology Demonstration  

SciTech Connect

The Idaho National Engineering and Environmental Laboratory (INEEL), the Los Alamos National Laboratory (LANL), and the Advanced Research and Applications Corporation (ARACOR) [Sunnyvale, California] performed a photonuclear technology demonstration for shielded nuclear material detection during August 2122, 2002, at the LANL TA-18 facility. The demonstration used the Pulsed Photonuclear Assessment Technique (PPAT) that focused on the application of a photofission-based, nuclear material detection method as a viable complement to the ARACOR Eagle inspection platform. The Eagle is a mobile and fully operational truck and cargo inspection system that uses a 6-MeV electron accelerator to perform real-time radiography. This imaging is performed using an approved radiation-safe or cabinet safe operation relative to the operators, inspectors, and any stowaways within the inspected vehicles. While the PPAT has been primarily developed for active interrogation, its neutron detection system also maintains a complete and effective passive detection capability.

Jones, James Litton; Yoon, Woo Yong; Haskell, Kevin James; Norman, Daren Reeve; Moss, C. E.; Goulding, C. A.; Hollas, C. L.; Myers, W. L.; Franco, Ed

2002-12-01T23:59:59.000Z

287

EIA Drilling Productivity Report  

U.S. Energy Information Administration (EIA) Indexed Site

Drilling Productivity Report Drilling Productivity Report For Center on Global Energy Policy, Columbia University October 29, 2013 | New York, NY By Adam Sieminski, Administrator The U.S. has experienced a rapid increase in natural gas and oil production from shale and other tight resources Adam Sieminski, EIA Drilling Productivity Report October 29, 2013 2 0 5 10 15 20 25 30 35 2000 2002 2004 2006 2008 2010 2012 Rest of US Marcellus (PA and WV) Haynesville (LA and TX) Eagle Ford (TX) Bakken (ND) Woodford (OK) Fayetteville (AR) Barnett (TX) Antrim (MI, IN, and OH) 0.0 0.4 0.8 1.2 1.6 2.0 2.4 2.8 2000 2002 2004 2006 2008 2010 2012 Eagle Ford (TX) Bakken (MT & ND) Granite Wash (OK & TX) Bonespring (TX Permian) Wolfcamp (TX Permian) Spraberry (TX Permian) Niobrara-Codell (CO) Woodford (OK)

288

Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume I of V; 1992 Annual Report.  

DOE Green Energy (OSTI)

Individual operational plans for 1993 are provided for the Abernathy Salmon Culture Technology Center, Carson National Fish Hatchery, Dworshak National Fish Hatchery, Eagle Creek National Fish Hatchery, Entiat National Fish Hatchery, Hagerman National Fish Hatchery, Kooskia National Fish Hatchery, Leavenworth National Fish Hatchery, Little White Salmon National Fish Hatchery, Spring Creek National Fish Hatchery, Warm Springs National Fish Hatchery, Willard National Fish Hatchery, and the Winthrop National Fish Hatchery.

Shelldrake, Tom

1993-08-01T23:59:59.000Z

289

Wilcox sandstone reservoirs in the deep subsurface along the Texas Gulf Coast - their potential for production of geopressured geothermal energy. Final report  

DOE Green Energy (OSTI)

The following subjects are included: regional setting, stratigraphic sections, Lower Wilcox sandstone distribution, formation pressure, formation temperature used to delineate geothermal fairways, Zapata Fairway, Duval Fairway, Live Oak Fairway, De Witt Fairway, Colorado Fairway, and Harris Fairway. Depositional and structural style, formation pressures and temperatures, porosity and permeability, formation water salinity, and Cuero Prospect are covered for De Witt Fairway. Depositional and structural style, formation and fluid properties, and Eagle Lake Prospect are covered for Colorado Fairway. (MHR)

Debout, D.G.; Weise, B.R.; Gregory, A.R.; Edwards, M.B.

1979-10-01T23:59:59.000Z

290

Meeting today's challenges to supply tomorrow's energy. Clean fossil energy technical and policy seminar  

SciTech Connect

Papers discussed the coal policy of China, Russia, Indonesia and Vietnam; clean coal technology (small-scale coal power plants, carbon capture and sequestration, new coking process SCOPE21, coal gasification (HyPr-RING), CO{sub 2} reduction technology, Supercritical coal-fired units and CFB boilers, EAGLE project, coal liquefaction), the coal consumer's view of clean fossil energy policy, and natural gas policy and technology. Some of the papers only consist of the presentation overheads/viewgraphs.

NONE

2005-07-01T23:59:59.000Z

291

The use of solid-state NMR techniques for the analysis of water in coal and the effect of different coal drying techniques on the structure and reactivity of coal  

SciTech Connect

The results of measuring the change in moisture content of the Eagle Butte and Usebelli coals as a function of time are shown in Figure 1. As expected, the measured moisture content increases with time and reaches a maximum after about 8 hours. Two different types of sorbed water are removed sequentially. Free or surface sorbed water is rapidly removed followed by the water in the micropores of the coal as the reagents migrate into the pore structure. There appears to be an induction period of about 4 hours for the Eagle Butte coal before the moisture content increases more rapidly with time due to the reactions of the more tightly bound or pore'' water with the reagents. The chemical drying experiment was repeated twice for the Usebelli coal. In the first experiment, aliquots of the reaction mixture were removed sequentially, and in the second experiment separate coal samples were prepared and allowed to stand until the appropriate time for the NMR spectrum to be acquired. Excellent reproducibility was obtained. Both cools were thermally dried by heating to 110[degrees]C for 1 hour. The moisture content was determined by weight loss. Using the thermal drying method, the Eagle Butte coal had a moisture content of 16.6 wt % and the Usebelli coal a moisture content of 14.1 wt %. These values are near the moisture content of coal as determined by chemical drying.

Netzel, D.A.

1992-01-01T23:59:59.000Z

292

The use of solid-state NMR techniques for the analysis of water in coal and the effect of different coal drying techniques on the structure and reactivity of coal. Quarterly report, June 1, 1992--August 31, 1992  

SciTech Connect

The results of measuring the change in moisture content of the Eagle Butte and Usebelli coals as a function of time are shown in Figure 1. As expected, the measured moisture content increases with time and reaches a maximum after about 8 hours. Two different types of sorbed water are removed sequentially. Free or surface sorbed water is rapidly removed followed by the water in the micropores of the coal as the reagents migrate into the pore structure. There appears to be an induction period of about 4 hours for the Eagle Butte coal before the moisture content increases more rapidly with time due to the reactions of the more ``tightly bound or ``pore`` water with the reagents. The chemical drying experiment was repeated twice for the Usebelli coal. In the first experiment, aliquots of the reaction mixture were removed sequentially, and in the second experiment separate coal samples were prepared and allowed to stand until the appropriate time for the NMR spectrum to be acquired. Excellent reproducibility was obtained. Both cools were thermally dried by heating to 110{degrees}C for 1 hour. The moisture content was determined by weight loss. Using the thermal drying method, the Eagle Butte coal had a moisture content of 16.6 wt % and the Usebelli coal a moisture content of 14.1 wt %. These values are near the moisture content of coal as determined by chemical drying.

Netzel, D.A.

1992-12-01T23:59:59.000Z

293

Captive Rearing Program for Salmon River Chinook Salmon : Project Progress Report, 2001 Annual Report.  

SciTech Connect

During 2001, the Idaho Department of Fish and Game continued to develop techniques to rear chinook salmon Oncorhynchus tshawytscha to sexual maturity in captivity and to monitor their reproductive performance under natural conditions. Eyed-eggs were hydraulically collected from redds in the East Fork Salmon River (EFSR; N = 311) and the West Fork Yankee Fork Salmon River (WFYF; N = 272) to establish brood year 2001 culture cohorts. The eyed-eggs were incubated and reared by family group at the Eagle Fish Hatchery (Eagle). Juveniles collected the previous summer were PIT and elastomer tagged and vaccinated against vibrio Vibrio spp. and bacterial kidney disease prior to the majority of them being transferred to the National Marine Fisheries Service, Manchester Marine Experimental Station for saltwater rearing through maturity. Smolt transfers included 210 individuals from the Lemhi River (LEM), 242 from the WFYF, and 178 from the EFSR. Maturing fish transfers from Manchester to Eagle included 62 individuals from the LEM, 72 from the WFYF, and 27 from the EFSR. Additional water chilling capacity was added at Eagle in 2001 to test if spawn timing could be advanced by temperature manipulations, and adults from the LEM and WFYF were divided into chilled ({approx} 9 C) and ambient ({approx} 13.5 C) water temperature groups while at Eagle. Twenty-five mature females from the LEM (11 chilled, 14 ambient) were spawned in captivity with 23 males with the same temperature history in 2001. Water temperature group was not shown to affect the spawn timing of these females, but males did mature earlier. Egg survival to the eyed stage of development averaged 37.9% and did not differ significantly between the two temperature groups. A total of 8,154 eyed-eggs from these crosses were placed in in-stream incubators by personnel from the Shoshone-Bannock Tribe. Mature adults (N = 89) were released into the WFYF to evaluate their reproductive performance. After release, fish distributed themselves throughout the study section and displayed a progression of habitat associations and behavior consistent with progressing maturation and the onset of spawning. Five of the 18 redds spawned by captive-reared parents were hydraulically sampled to assess survival to the eyed stage of development. Eyed-eggs were collected from four of these, and survival to this stage ranged from 0%-89%. Expanding these results to the remaining redds produced an estimate of 15,000 eyed-eggs being produced by captive-reared fish.

Venditti, David A.

2003-10-01T23:59:59.000Z

294

Captive Rearing Program for Salmon River Chinook Salmon, 2002 Annual Report.  

DOE Green Energy (OSTI)

During 2002, the Idaho Department of Fish and Game continued to develop techniques to rear Chinook salmon Oncorhynchus tshawytscha to sexual maturity in captivity and to monitor their reproductive performance under natural conditions. Eyed-eggs were hydraulically collected from redds in the East Fork Salmon River (EFSR; N = 328) and the West Fork Yankee Fork Salmon River (WFYF; N = 308) to establish brood year 2002 culture cohorts. The eyed-eggs were incubated and reared at the Eagle Fish Hatchery, Eagle, Idaho (Eagle). Juveniles collected in 2000 were PIT and elastomer tagged and vaccinated against vibrio Vibrio spp. and bacterial kidney disease prior to being transferred to the NOAA Fisheries, Manchester Marine Experimental Station, Manchester, Washington (Manchester) for saltwater rearing through maturity. Smolt transfers included 203 individuals from the WFYF and 379 from the EFSR. Maturing fish transfers from Manchester to Eagle included 107 individuals from the LEM, 167 from the WFYF, and 82 from the EFSR. This was the second year maturing adults were held on chilled water at Eagle to test if water temperature manipulations could advance spawn timing. Adults from the LEM and WFYF were divided into chilled ({approx} 9 C) and ambient ({approx} 13.5 C) temperature groups while at Eagle. Forty-seven mature females from the LEM (19 chilled, 16 ambient, and 12 ambient not included in the temperature study) were spawned at Eagle with 42 males in 2002. Water temperature group was not shown to affect the spawn timing of these females, but males did mature earlier. Egg survival to the eyed stage averaged 66.5% and did not differ significantly between the temperature groups. Personnel from the Shoshone-Bannock Tribe placed a total of 47,977 eyed-eggs from these crosses in in-stream incubators. Mature adults (N = 215 including 56 precocial males) were released into the WFYF to evaluate their reproductive performance. After release, fish distributed themselves throughout the study section and displayed a progression of habitat associations and behavior consistent with progressing maturation and the onset of spawning. Twenty-six captive-reared females constructed 33 redds in the WFYF in 2002. Eighteen of these were hydraulically sampled, and eggs were collected from 17. The percentage of live eggs ranged from 0-100% and averaged 34.6%. No live eggs were found in redds spawned by brood year 1997 females. Expanding these results to the remaining redds gives an estimate of 22,900 eyed-eggs being produced by captive-reared fish in the WFYF. Additionally, 130 mature adults (including 41 precocial males) were released into the EFSR. Almost all of these fish moved out of the areas shoreline observers had access to, so no spawning behavior was observed. Radio-telemetry indicated that most of these fish initially moved downstream (although three females moved upstream as far as 7 km) and then held position.

Venditti, David; Willard, Catherine; James, Chris

2003-11-01T23:59:59.000Z

295

CX-004530: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-004530: Categorical Exclusion Determination Bald Mountain Low-Temperature Geothermal Project CX(s) Applied: A9, B3.1 Date: 11/24/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Oski Energy LLC would use U.S. Department of Energy grant funds to validate the theoretical as well as actual performance advantages of an advanced ammonia-water mixed fluid cycle (Project Cycle) over the current state-of-the-art Organic Rankine Cycle (ORC) for both on and off design point operating conditions in low temperature geothermal resource applications, validate that the Project Cycle offers significant economic benefits over ORC for similar project net output generation levels, prove

296

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 31470 of 31,917 results. 61 - 31470 of 31,917 results. Download WELDING, CUTTING AND BRAZING Assessment Plan NNSA/Nevada Site Office Facility Representative Divisionn This assessment is to verify hot work requirements associated with welding, cutting, burning, brazing, grinding and other spark- or flame-producing operations have been implemented. Verify that... http://energy.gov/hss/downloads/welding-cutting-and-brazing-assessment-plan-nnsanevada-site-office Download CX-010146: Categorical Exclusion Determination Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades CX(s) Applied: B1.19 Date: 04/24/2013 Location(s): Montana, Montana, Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010146-categorical-exclusion-determination

297

The Entire Botany Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Botany Archives Botany Archives Botany Archives, Since May 2000 Table of Contents: Ginseng Caterpillars and Pin Oaks Seaweed and Nutrition Blue Leaves Walnut Problems Italian Trees Purple Plants Poplar Up-date European Tree Design Planting Magnolia Trees Schoolyard Plants Poplar Droppings Fungi Spores Woodland Adaptations Growing Lichen Apple Tree Maturity Horse Poison Plants Honeysuckle Poison Old Trees Leaking Popular Cottonwood Infestation Tulip Tree Seeds Bald Cypress Ecology Maple Recovery Leaf Minors Catalpa Problem Berm Enhancement Organic Gardening Ailing Burr Oak Damaged Cypress Tree Reed Ridding Berm Enhancement Tulip Tree Flowering Lichens Weed Seeds Plants at Night Kombu Seaweed Plants at Night Crab Grass Phloem Physiology Elm Disease Bark Thickness Poison Sumac Growing Fields Killing Pine Trees

298

StarWars Laser Technology Applied to Drilling and Completing Gas Wells  

NLE Websites -- All DOE Office Websites (Extended Search)

u' m .,. . Society of Petroleum Engineers u I SPE 49259 StarWars Laser Technology Applied to Drilling and Completing Gas Wells R.M. Graves, SPE, Colorado School of Mines; and D.G. O'Brien, PE, SPE, Solutions Engineering Copyr@ht 1998, Scdety of Petroleum Engineers, Inc. This paper was prapared for presentation at the 1998 SPE Annual Technicar Conference and Exhibition bald in New Orteans, Lcuisiana, 27-30 September 1998, This paper waa selected for presentation by en SPE Program Commiftee folrowing review of information contained in an abstract submitted by the author(a). Contents of the paper, as prasented, have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The materiar, as presented, does not necessarily reflect any position of the .%ciety of Petroleum Engineers, its officers, or members. Papers prasented at SPE meetings

299

A weekly review of scientific and technological achievements from Lawrence Liver  

NLE Websites -- All DOE Office Websites (Extended Search)

weekly review of scientific and technological achievements from Lawrence Livermore weekly review of scientific and technological achievements from Lawrence Livermore National Laboratory, July 15-19, 2013. Ancient trees found underwater may provide clues to climate change. Photo by Ben Raines/AL.com/AP An ancient grove of Cypress trees found 60 feet underwater may help scientists understand past climate change. Sonar data was used to find 50 and 100 stumps, as well as an unknown number of logs. The trees are closely related to the modern-day Bald Cypress. The forest itself has been dead at least 50,000 years, according to scientists at the Lawrence Livermore Laboratory, who dated samples from the trees by looking for carbon-14, a radioactive isotope that is found in every living organism but that steadily decays after the

300

Property Comparison Tables: Hardness and Tensile Properties  

Science Conference Proceedings (OSTI)

Table 6   Tensile modulus of elasticity in tension at room temperature...11.7 1.7 5.9 0.86 Spruce (sitka) 11.0 1.6 ? ? Poplar (yellow) 11.0 1.6 ? ? Carbon, petroleum coke base 11.0 1.6 15.8 2.3 Indium 10.8 1.57 ? ? Basswood 10.3 1.5 ? ? Elm (rock) 10.3 1.5 ? ? Polysulfone, 30??40% glass reinforced 10.3 1.5 7.6 1.1 Cypress (Southern bald) 9.6 1.4 ? ? Nylons; 30% glass...

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Snake River Sockeye Salmon Captive Broodstock; Research Element, 1993 Annual Report.  

DOE Green Energy (OSTI)

In 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. Initial steps to recover the species include the establishment of captive broodstocks at the Eagle Fish Hatchery in Eagle, Idaho. Research and recovery activities for sockeye conducted by the Idaho Department of Fish and Game during the period of April 1993 to April 1994 are covered by this report. Eight anadromous adults (two female and six male) returned to the Redfish Lake Creek trap this year and were spawned at the Sawtooth Hatchery near Stanley, Idaho. Fecundity was 3160 for each female. The mean fertilization rate was 52% for female {open_quotes}A{close_quotes} and 65% for female {open_quotes}B.{close_quotes} Captive broodstock also spawned as well as residual sockeye captured in a Merwin trap in Redfish Lake. Spawning data from 72 fish spawned during this period is included in this report. Captive broodstock also matured later than normal (winter and spring 1994). Fish were spawned and samples were taken to investigate reasons for poor fertilization rates. Twenty-four out migrants of 1991 were selected for return to Redfish Lake for volitional spawning. Releases were made in August of 1993. All fish were implanted with sonic tags and tracking of this group began soon after the release to identify spawning-related activities. A research project is being conducted on captive broodstock diets. The project will investigate the effect of diet modification on spawn timing, gamete quality, and fertilization rates. A second project used ultrasound to examine fish for sexual maturity. The goal was to obtain a group a fish to be released f or volitional spawning. A total of 44 fish were found to be mature. The performance of all captive groups held at Eagle are included in this report.

Johnson, Keith A.

1995-12-01T23:59:59.000Z

302

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 1997 Annual Report.  

DOE Green Energy (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported under separate cover. Captive broodstock program activities conducted between January 1, 1997 and December 31, 1997 are presented in this report. One hundred twenty-six female sockeye salmon from one captive broodstock group were spawned at the Eagle Fish Hatchery in 1997. Successful spawn pairings produced approximately 148,781 eyed-eggs with a cumulative mean survival to eyed-egg rate of 57.3%. Approximately 361,600 sockeye salmon were released to Sawtooth basin waters in 1997. Reintroduction strategies included eyed-eggs (brood year 1997), presmolts (brood year 1996), and prespawn adults for volitional spawning (brood year 1994). Release locations included Redfish Lake, Alturas Lake, and Pettit Lake. During this reporting period, four broodstocks and two unique production groups were in culture at the Eagle Fish Hatchery. Two of the four broodstocks were incorporated into the 1997 spawning design, and one broodstock was terminated following the completion of spawning.

Kline, Paul A.; Heindel, Jeff A.; Willard, Catherine (Idaho Department of Fish and Game, Boise, ID)

2003-08-01T23:59:59.000Z

303

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

Major U.S. Coal Mines, 2012" Major U.S. Coal Mines, 2012" "Rank","Mine Name / Company","Mine Type","State","Production (short tons)" 1,"North Antelope Rochelle Mine / Peabody Powder River Mining Ll","Surface","Wyoming",107639188 2,"Black Thunder / Thunder Basin Coal Company Llc","Surface","Wyoming",93082919 3,"Cordero Mine / Cordero Mining Llc","Surface","Wyoming",39204736 4,"Antelope Coal Mine / Antelope Coal Llc","Surface","Wyoming",34316314 5,"Belle Ayr Mine / Alpha Coal West, Inc.","Surface","Wyoming",24227846 6,"Eagle Butte Mine / Alpha Coal West, Inc.","Surface","Wyoming",22466733

304

U.S. Department of Energy NEPA Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AK-TRIBE-TANANA CHIEF'S CONFERENCE AK-TRIBE-TANANA CHIEF'S CONFERENCE Location: Tribe AK-TRIBE-TANANA CHIEF'S CONFERENCE AK American Recovery and Reinvestment Act: Proposed Action or Project Descriptio The Tanana Chief's Conference of Alaska proposes to conduct building retrofits on tribal facilities located in several tribal villages (Anvik, Arctic Village, Beaver, Huslia, Manley Hot Springs, Eagle, Tanacross, Dot Lake, Takona, Grayling, Northway, and Tanana). Building retrofits would include upgrading thermal roof insulation, installing new energy efficient windows, installing new insulated doors, upgrading door weather stripping, upgrading thermostats in the facilities, and conducting boiler recommissioning in each building to

305

Microsoft Word - Annual Report 2009_Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Strategic Petroleum Reserve Annual Report for Calendar Year 2009 Assistant Secretary for Fossil Energy Office of Petroleum Reserves U.S. Department of Energy Washington, DC 20585 Strategic Petroleum Reserve: www.spr.doe.gov The Eagle Tacoma delivering the final cargo of crude oil to achieve 727 million barrels on December 25-27. DOE/FE - 0538 Strategic Petroleum Reserve Annual Report for Calendar Year 2009 Assistant Secretary for Fossil Energy Office of Petroleum Reserves U.S. Department of Energy Washington, DC 20585 Strategic Petroleum Reserve: www.spr.doe.gov Strategic Petroleum Reserve Annual Report 2009 i TABLE OF CONTENTS EXECUTIVE SUMMARY Program Highlights and Status ............................................................................................ 1

306

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2011 November 4, 2011 EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) November 1, 2011 EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory Modernization Planning October 31, 2011 EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research Center, Battleground Energy Recovery Project, Deer Park, Harris County, Texas (October 2011) October 28, 2011 EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) October 20, 2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado

307

A tentative classification of the bya ru can kings of Zhang zhung  

E-Print Network (OSTI)

grags text 1 p. 22 lines 4-5). They comprised a white turban pierced with eagle feathers, and skins of white lynx, white wolf and stag gzig gung gsum (tiger, leopard and another kind of wild cat). Tibetan Studies in honor of Samten Karmay 390 le... wore a radiant jewelled bya ru (rin chen od kyi bya ru), another one emitting a rainbow radiance (gzha tshon od kyi bya ru), and the third a crown made of mother- of-pearl (un chen dung gis bya ruun chen seemingly refers to a kind of mother...

Vitali, Roberto

2008-01-01T23:59:59.000Z

308

Research and Recovery of Snake River Sockeye Salmon, 1992 Annual Report.  

DOE Green Energy (OSTI)

Significant changes were made in the fish rearing facilities at the Idaho Department of Fish and Game`s (IDFG) Eagle Hatchery during the contract period. Rearing and develop sampling protocols for genetics and pathology were developed. The rearing protocol was derived with assistance of the Technical Oversight Committee, the scientific advisory group, and several fish culturists and nutritionists who were consulted informally. The standards were incorporated into the Research and Propagation Permit from National Marine Fisheries Service was applied for during this project period. Pathology and genetics samples have been taken and processed from each fish which died during the rearing phase.

Johnson, Keith A.

1993-05-01T23:59:59.000Z

309

Shale Oil Production Performance from a Stimulated Reservoir Volume  

E-Print Network (OSTI)

The horizontal well with multiple transverse fractures has proven to be an effective strategy for shale gas reservoir exploitation. Some operators are successfully producing shale oil using the same strategy. Due to its higher viscosity and eventual 2-phase flow conditions when the formation pressure drops below the oil bubble point pressure, shale oil is likely to be limited to lower recovery efficiency than shale gas. However, the recently discovered Eagle Ford shale formations is significantly over pressured, and initial formation pressure is well above the bubble point pressure in the oil window. This, coupled with successful hydraulic fracturing methodologies, is leading to commercial wells. This study evaluates the recovery potential for oil produced both above and below the bubble point pressure from very low permeability unconventional shale oil formations. We explain how the Eagle Ford shale is different from other shales such as the Barnett and others. Although, Eagle Ford shale produces oil, condensate and dry gas in different areas, our study focuses in the oil window of the Eagle Ford shale. We used the logarithmically gridded locally refined gridding scheme to properly model the flow in the hydraulic fracture, the flow from the fracture to the matrix and the flow in the matrix. The steep pressure and saturation changes near the hydraulic fractures are captured using this gridding scheme. We compare the modeled production of shale oil from the very low permeability reservoir to conventional reservoir flow behavior. We show how production behavior and recovery of oil from the low permeability shale formation is a function of the rock properties, formation fluid properties and the fracturing operations. The sensitivity studies illustrate the important parameters affecting shale oil production performance from the stimulated reservoir volume. The parameters studied in our work includes fracture spacing, fracture half-length, rock compressibility, critical gas saturation (for 2 phase flow below the bubble point of oil), flowing bottom-hole pressure, hydraulic fracture conductivity, and matrix permeability. The sensitivity studies show that placing fractures closely, increasing the fracture half-length, making higher conductive fractures leads to higher recovery of oil. Also, the thesis stresses the need to carry out the core analysis and other reservoir studies to capture the important rock and fluid parameters like the rock permeability and the critical gas saturation.

Chaudhary, Anish Singh

2011-08-01T23:59:59.000Z

310

RMOTC - Library - Test Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Reports Test Reports All non-proprietary project reports that are approved for release are posted here. Many of RMOTC's projects have protection extended through a Cooperative Research and Development Agreement (CRADA) and may not be available for release at this time. If you have questions about a specific report, Contact Us. Name Partner Category EOR Technology (2011) (PDF) Trimeteor Production Viscosity Reduction (May 2012) (PDF) STWA Production Viscosity Reduction (April 2012) (PDF) STWA Production Viscosity Reduction (October 2011) (PDF) STWA Production Acoustek Assessment (PDF) BP Group Production Airborne Survey (PDF) Electro-Seise, Inc. Production Beam Gas Compressor (PDF) Morrison International Energy Production Bentonite Plugging (PDF) Eagle Cap, Inc. Production

311

U.S. Department of Energy Adoption of Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System (DOE/EA-1905) October 2011 United States Department of the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NM- P020-114414 Double Eagle Water System U.S. Department of the Interior Bureau of Land Management Pecos District Carlsbad Field Office 620 E Greene Street Carlsbad, NM 88220 Phone: (575) 887-6544 FAX: (575) 885-9264 'C'; I : ii, I I TABLE OF CONTENTS 1. Purpose and Need for Action 1 1.1. Background 1 1.2. Purpose and Need for Action 1 1.3. Decision to be Made 1 1.4. Conformance with Applicable Land Use Plan(s) 1 1.5. Scoping, Public Involvement, and Issues 2 2. Proposed Action and Alternative(s) 3 2.1. Alternative A: No Action 3 2.2. Alternative B: Build Alternative B100 3 2.3. Alternative C: Build Alternative C (Proposed Action) 3

312

Agency datasets monthly list | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Bullion Sales and Mintage Figures Sales totals by month are updated every weekday by 5 p.m. (ET). Mintage is updated annually. Programs tracked in this report include: American Eagle, American Buffalo, and America the Beautiful Silver Five Ounce Coin. TREAS MINT Federal Government Finances and Employment 2013-08-22 07:38:38 Bullion Sales and Mintage Figures Sales totals by month are updated every weekday by 5 p.m. (ET). Mintage is updated annually. Programs tracked in this report include: American Eagle, American Buffalo, and America the Beautiful Silver Five Ounce Coin. TREAS MINT Federal Government Finances and Employment 2013-08-22 07:38:38 Circulating Coins Production Figures Production figures for circulating coins by denomination manufactured in Denver and Philadelphia. Updated monthly. Data includes active and inactive programs. Programs tracked in this report include: America the Beautiful Quarters, Presidential $1 Coins, District of Columbia and U.S. Territories Quarters, 50 State Quarters, Westward Journey Nickel Series. Presidential $1 Coins, Native American $1 Coins, and Kennedy Half Dollar Coins are currently only minted for numismatic products. Coins minted for numismatic bags, rolls, and boxes are produced in the circulating departments and may be shown in circulating totals. TREAS MINT Federal Government Finances and Employment 2013-08-22 07:38:38

313

U.S. Department of Energy Adoption of Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System (DOE/EA-1905) October 2011 United States Department of the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NM- P020-114414 Double Eagle Water System U.S. Department of the Interior Bureau of Land Management Pecos District Carlsbad Field Office 620 E Greene Street Carlsbad, NM 88220 Phone: (575) 887-6544 FAX: (575) 885-9264 'C'; I : ii, I I TABLE OF CONTENTS 1. Purpose and Need for Action 1 1.1. Background 1 1.2. Purpose and Need for Action 1 1.3. Decision to be Made 1 1.4. Conformance with Applicable Land Use Plan(s) 1 1.5. Scoping, Public Involvement, and Issues 2 2. Proposed Action and Alternative(s) 3 2.1. Alternative A: No Action 3 2.2. Alternative B: Build Alternative B100 3 2.3. Alternative C: Build Alternative C (Proposed Action) 3 2.4. Design

314

Chattan  

Gasoline and Diesel Fuel Update (EIA)

Chattan Chattan ooga Eag le For d Devo nian (Ohi o) Mar cellu s Utica He rm osa Nio bra ra* Bak ken *** Nio bra ra* Mo nte rey Mo nte rey - Tem blo r Ava lon Heath ** Tuscaloosa Mow ry Ant rim Bar net t Ben d New Alban y Wo odf ord Ba rn ett - Wo od for d Le wis Hilli ard- Ba xter - Man cos -Nio bra ra Exc e llo- Mul ky Fay ette ville Floyd- Neal Gam m on Cody Hayn esvil le- Boss ier Ma nco s Pie rre- Nio bra ra Conasauga Colo rado Grou p Utica Doig Phosphate Montney Muskwa- Otter Park Muskwa-Otter Park, Evie-Klua Lower Besa River Frederick Brook Horton Bluff Pimienta Eagle Ford, Tithonian Maltrata Eagle Ford, La Casita Pimienta, Tamaulipas North American shale plays 0 400 800 200 600 Miles ± Source: U.S. Energy Information Administration based on data from various published studies. Canada and Mexico plays from ARI. Updated: May 9, 2011 (as of May 2011) * Mixed shale & chalk play

315

Bird Risk Behaviors and Fatalities at the Altamont Pass Wind Resource Area: Period of Performance, March 1998--December 2000  

SciTech Connect

It has been documented that wind turbine operations at the Altamont Pass Wind Resource Area kill large numbers of birds of multiple species, including raptors. We initiated a study that integrates research on bird behaviors, raptor prey availability, turbine design, inter-turbine distribution, landscape attributes, and range management practices to explain the variation in avian mortality at two levels of analysis: the turbine and the string of turbines. We found that inter-specific differences in intensities of use of airspace within close proximity did not explain the variation in mortality among species. Unique suites of attributes relate to mortality of each species, so species-specific analyses are required to understand the factors that underlie turbine-caused fatalities. We found that golden eagles are killed by turbines located in the canyons and that rock piles produced during preparation of the wind tower laydown areas related positively to eagle mortality, perhaps due to the use of these rock piles as cover by desert cottontails. Other similar relationships between fatalities and environmental factors are identified and discussed. The tasks remaining to complete the project are summarized.

Thelander, C. G.; Smallwood, K. S.; Rugge, L.

2003-12-01T23:59:59.000Z

316

Determination of white phosphorus residues in ducks: An atomic emission detection/compound-independent calibration-based method of generating residue data for risk assessment and environmental monitoring  

Science Conference Proceedings (OSTI)

Analysis of phosphorus concentrations in the gizzards of ducks harvested from munitions sites is necessary to ascertain if acute phosphorus toxicity was the cause of death and to estimate potential secondary hazards to predators and scavengers, such as eagles that readily consume the dead ducks. Gas chromatography-atomic emission detection analysis permitted compound-independent quantification of white phosphorus standards following analysis of the stable phosphorus-containing compound triethyl phosphate. The white phosphorus standards were then used to quantify white phosphorus residues in duck gizzard extracts by gas chromatography-flame photometric detection analysis. For gizzards containing less than 0.01 {micro}g of phosphorus, quantification was based on a three-point calibration curve. For gizzards containing 0.01 {micro}g or more of white phosphorus, single-point calibration was used. Mean recoveries for phosphorus-fortified gizzards ranged from 73 to 91%. The method limit of detection was 0.013 {micro}g of phosphorus. This method was successfully applied to the quantification of white phosphorus in ducks collected from Eagle River Flats, AK. Potential applications to risk assessment and environmental monitoring are also discussed.

Johnston, J.J.; Goldade, D.A.; Kohler, D.J.; Cummings, J.L.

2000-05-01T23:59:59.000Z

317

High-performance batteries for electric-vehicle propulsion and stationary energy storage. Progress report, October 1977--September 1978  

DOE Green Energy (OSTI)

The research, development, and management activities of the programs at Argonne National Laboratory (ANL) and at industrial subcontractors' laboratories on high-temperature batteries during the period October 1977--September 1978 are reported. These batteries are being developed for electric-vehicle propulsion and for stationary-energy-storage applications. The present cells, which operate at 400 to 500/sup 0/C, are of a vertically oriented, prismatic design with one or more inner positive electrodes of FeS or FeS/sub 2/, facing electrodes of lithium--aluminum alloy, and molten LiCl--KCl electrolyte. During this fiscal year, cell and battery development work continued at ANL, Eagle--Picher Industries, Inc., the Energy Systems Group of Rockwell International, and Gould Inc. Related work was also in progress at the Carborundum Co., General Motors Research Laboratories, and various other organizations. A major event was the initiation of a subcontract with Eagle--Picher Industries to develop, design, and fabricate a 40-kWh battery (Mark IA) for testing in an electric van. Conceptual design studies on a 100-MWh stationary-energy-storage module were conducted as a joint effort between ANL and Rockwell International. A significant technical advance was the development of multiplate cells, which are capable of higher performance than bicells. 89 figures, 57 tables.

Nelson, P.A.; Barney, D.L.; Steunenberg, R.K.

1978-11-01T23:59:59.000Z

318

High-performance batteries for electric-vehicle propulsion and stationary energy storage. Progress report, October 1977--September 1978  

SciTech Connect

The research, development, and management activities of the programs at Argonne National Laboratory (ANL) and at industrial subcontractors' laboratories on high-temperature batteries during the period October 1977--September 1978 are reported. These batteries are being developed for electric-vehicle propulsion and for stationary-energy-storage applications. The present cells, which operate at 400 to 500/sup 0/C, are of a vertically oriented, prismatic design with one or more inner positive electrodes of FeS or FeS/sub 2/, facing electrodes of lithium--aluminum alloy, and molten LiCl--KCl electrolyte. During this fiscal year, cell and battery development work continued at ANL, Eagle--Picher Industries, Inc., the Energy Systems Group of Rockwell International, and Gould Inc. Related work was also in progress at the Carborundum Co., General Motors Research Laboratories, and various other organizations. A major event was the initiation of a subcontract with Eagle--Picher Industries to develop, design, and fabricate a 40-kWh battery (Mark IA) for testing in an electric van. Conceptual design studies on a 100-MWh stationary-energy-storage module were conducted as a joint effort between ANL and Rockwell International. A significant technical advance was the development of multiplate cells, which are capable of higher performance than bicells. 89 figures, 57 tables.

Nelson, P.A.; Barney, D.L.; Steunenberg, R.K.

1978-11-01T23:59:59.000Z

319

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 1999 Annual Report.  

DOE Green Energy (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases are also reported under separate cover. Captive broodstock program activities conducted between January 1, 1999 and December 31, 1999 are presented in this report. In 1999, seven anadromous sockeye salmon returned to the Sawtooth Valley and were captured at the adult weir located on the upper Salmon River. Four anadromous adults were incorporated in the captive broodstock program spawning design for year 1999. The remaining three adults were released to Redfish Lake for natural spawning. All seven adults were adipose and left ventral fin-clipped, indicating hatchery origin. One sockeye salmon female from the anadromous group and 81 females from the captive broodstock group were spawned at the Eagle Fish Hatchery in 1999. Spawn pairings produced approximately 63,147 eyed-eggs with egg survival to eyed-stage of development averaging 38.97%. Eyed-eggs (20,311), presmolts (40,271), smolts (9,718), and adults (21) were planted or released into Sawtooth Valley waters in 1999. Supplementation strategies involved releases to Redfish Lake, Redfish Lake Creek, upper Salmon River (below the Sawtooth Fish Hatchery weir), Alturas Lake, and Pettit Lake. During this reporting period, four broodstocks and three production groups were in culture at the Eagle Fish Hatchery. Two of the four broodstocks were incorporated into the 1999 spawning design and one broodstock was terminated following the completion of spawning.

Baker, Dan J,; Heindel, Jeff A.; Kline, Paul A. (Idaho Department of Fish and Game, Boise, ID)

2005-08-01T23:59:59.000Z

320

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2002 Annual Report.  

DOE Green Energy (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Oceanic and Atmospheric Administration at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Oceanic and Atmospheric Administration are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2002 and December 31, 2002 for the hatchery element of the program are presented in this report. n 2002, 22 anadromous sockeye salmon returned to the Sawtooth Valley. Fifteen of these adults were captured at adult weirs located on the upper Salmon River and on Redfish Lake Creek. Seven of the anadromous sockeye salmon that returned were observed below the Sawtooth Fish Hatchery weir and allowed to migrate upstream volitionally (following the dismantling of the weir on September 30, 2002). All adult returns were released to Redfish Lake for natural spawning. Based on their marks, returning adult sockeye salmon originated from a variety of release options. Sixty-six females from brood year 1999 and 28 females from brood year 2000 captive broodstock groups were spawned at the Eagle Hatchery in 2002. Spawn pairings produced approximately 65,838 eyed-eggs with egg survival to eyed stage of development averaging 55.1%. Presmolts (140,410), smolts (38,672), and adults (190) were planted or released into Sawtooth Valley waters in 2002. Reintroduction strategies involved releases to Redfish Lake, Redfish Lake Creek, Alturas Lake, and Pettit Lake. During this reporting period, five broodstocks and three unique production groups were in culture at Idaho Department of Fish and Game facilities (Eagle Fish Hatchery and Sawtooth Fish Hatchery). Three of the five broodstocks were incorporated into the 2002 spawning design, and one broodstock was terminated following the completion of spawning.

Willard, Catherine; Baker, Dan J.; Heindel, Jeff A. (Idaho Department of Fish and Game, Boise, ID)

2003-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Captive Rearing Initiative for Salmon River Chinook Salmon, 1998-1999 Progress Report.  

DOE Green Energy (OSTI)

During 1999, the Idaho Department of Fish and Game (IDFG) continued developing techniques for the captive rearing of chinook salmon Oncorhynchus tshawytscha. Techniques under development included protocols for rearing juveniles in freshwater and saltwater hatchery environments, and fieldwork to collect brood year 1998 and 1999 juveniles and eggs and to investigate the ability of these fish to spawn naturally. Fish collected as juveniles were held for a short time at the Sawtooth Fish Hatchery and later transferred to the Eagle Fish Hatchery for rearing. Eyed-eggs were transferred immediately to the Eagle Fish Hatchery where they were disinfected and reared by family groups. When fish from either collection method reached approximately 60 mm, they were PIT tagged and reared separately by brood year and source stream. Sixteen different groups were in culture at IDFG facilities in 1999. Hatchery spawning activities of captive-reared chinook salmon produced eyed-eggs for outplanting in streamside incubation chambers in the West Fork Yankee Fork Salmon River (N=2,297) and the East Fork Salmon River (N=1,038). Additionally, a number of these eggs were maintained at the Eagle Fish Hatchery to ensure adequate brood year 1999 representation from these systems, and produced 279 and 87 juveniles from the West Fork Yankee Fork and East Fork Salmon River, respectively. Eyed-eggs were not collected from the West Fork Yankee Fork due to low adult escapement. Brood year 1998 juveniles were collected from the Lemhi River (N=191), West Fork Yankee Fork Salmon River (N=229), and East Fork Salmon River (N=185). Additionally, brood year 1999 eyed-eggs were collected from the Lemhi River (N=264) and East Fork Salmon River (N=143). Sixty-two and seven maturing adults were released into Bear Valley Creek (Lemhi River system) and the East Fork Salmon River, respectively, for spawning evaluation in 1999. Nine female carcasses from Bear Valley Creek were examined for egg retention, and of these five were spawned out, one was partially spawned, and three died before depositing eggs. However, much of the spawning related behavior observed involved female chinook salmon paired with male bull trout Salvelinus confluentus. Two female carcasses from the East Fork Salmon River were recovered and examined for egg retention. One of these had spawned and one had not.

Hassemer, Peter F.

2001-04-01T23:59:59.000Z

322

Captive Rearing Initiative for Salmon River Chinook Salmon, 1999 Progress Report.  

DOE Green Energy (OSTI)

During 1999, the Idaho Department of Fish and Game (IDFG) continued developing techniques for the captive rearing of chinook salmon Oncorhynchus tshawytscha. Techniques under development included protocols for rearing juveniles in freshwater and saltwater hatchery environments, and fieldwork to collect brood year 1998 and 1999 juveniles and eggs and to investigate the ability of these fish to spawn naturally. Fish collected as juveniles were held for a short time at the Sawtooth Fish Hatchery and later transferred to the Eagle Fish Hatchery for rearing. Eyed-eggs were transferred immediately to the Eagle Fish Hatchery where they were disinfected and reared by family groups. When fish from either collection method reached approximately 60 mm, they were PIT tagged and reared separately by brood year and source stream. Sixteen different groups were in culture at IDFG facilities in 1999. Hatchery spawning activities of captive-reared chinook salmon produced eyed-eggs for outplanting in streamside incubation chambers in the West Fork Yankee Fork Salmon River (N=2,297) and the East Fork Salmon River (N=1,038). Additionally, a number of these eggs were maintained at the Eagle Fish Hatchery to ensure adequate brood year 1999 representation from these systems, and produced 279 and 87 juveniles from the West Fork Yankee Fork and East Fork Salmon River, respectively. Eyed-eggs were not collected from the West Fork Yankee Fork due to low adult escapement. Brood year 1998 juveniles were collected from the Lemhi River (N=191), West Fork Yankee Fork Salmon River (N=229), and East Fork Salmon River (N=185). Additionally, brood year 1999 eyed-eggs were collected from the Lemhi River (N=264) and East Fork Salmon River (N=143). Sixty-two and seven maturing adults were released into Bear Valley Creek (Lemhi River system) and the East Fork Salmon River, respectively, for spawning evaluation in 1999. Nine female carcasses from Bear Valley Creek were examined for egg retention, and of these five were spawned out, one was partially spawned, and three died before depositing eggs. However, much of the spawning related behavior observed involved female chinook salmon paired with male bull trout Salvelinus confluentus. Two female carcasses from the East Fork Salmon River were recovered and examined for egg retention. One of these had spawned and one had not.

Hassemer, Peter F.

2001-04-01T23:59:59.000Z

323

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2001 Annual Report.  

SciTech Connect

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2001 and December 31, 2001 for the hatchery element of the program are presented in this report. In 2001, 26 anadromous sockeye salmon returned to the Sawtooth Basin. Twenty-three of these adults were captured at adult weirs located on the upper Salmon River and on Redfish Lake Creek. Three of the anadromous sockeye salmon that returned were observed below the Sawtooth Fish Hatchery weir and allowed to migrate upstream volitionally (following the dismantling of the weir on October 12, 2001). Nine anadromous adults were incorporated into the captive broodstock program spawning design in 2001. The remaining adults were released to Redfish Lake for natural spawning. Based on their marks, returning adult sockeye salmon originated from a variety of release options. Two sockeye salmon females from the anadromous group and 152 females from the brood year 1998 captive broodstock group were spawned at the Eagle Hatchery in 2001. Spawn pairings produced approximately 118,121 eyed-eggs with egg survival to eyed stage of development averaging 42.0%. Presmolts (106,166), smolts (13,915), and adults (79) were planted or released into Stanley Basin waters in 2001. Supplementation strategies involved releases to Redfish Lake, Redfish Lake Creek, Alturas Lake, and Pettit Lake. During this reporting period, five broodstocks and two unique production groups were in culture at Idaho Department of Fish and Game facilities (Eagle Fish Hatchery and Sawtooth Fish Hatchery). Two of the five broodstocks were incorporated into the 2001 spawning design, and one broodstock was terminated following the completion of spawning.

Kline, Paul A.; Willard, Catherine; Baker, Dan J. (Idaho Department of Fish and Game, Boise, ID)

2003-08-01T23:59:59.000Z

324

Potential Magnetic Field around a Helical Flux-rope Current Structure in the Solar Corona  

E-Print Network (OSTI)

We consider the potential magnetic field associated with a helical electric line current flow, idealizing the near-potential coronal field within which a highly localized twisted current structure is embedded. It is found that this field has a significant axial component off the helical magnetic axis where there is no current flow, such that the flux winds around the axis. The helical line current field, in including the effects of flux rope writhe, is therefore more topologically complex than straight line and ring current fields sometimes used in solar flux rope models. The axial flux in magnetic fields around confined current structures may be affected by the writhe of these current structures such that the field twists preferentially with the same handedness as the writhe. This property of fields around confined current structures with writhe may be relevant to classes of coronal magnetic flux rope, including structures observed to have sigmoidal forms in soft X-rays and prominence magnetic fields. For example, ``bald patches'' and the associated heating by Parker current sheet dissipation seem likely. Thus some measurements of flux rope magnetic helicities may derive from external, near-potential fields. The predicted hemispheric preference for positive and negative magnetic helicities is consistent with observational results for prominences and sigmoids and past theoretical results for flux rope internal fields.

G. J. D. Petrie

2007-02-06T23:59:59.000Z

325

California/Geothermal | Open Energy Information  

Open Energy Info (EERE)

California/Geothermal California/Geothermal < California Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF California Geothermal General Regulatory Roadmap Geothermal Power Projects Under Development in California Developer Location Estimated Capacity (MW) Development Phase Geothermal Area Geothermal Region Alum Geothermal Project Ram Power Silver Peak, Nevada 64 MW64,000 kW 64,000,000 W 64,000,000,000 mW 0.064 GW 6.4e-5 TW Phase II - Resource Exploration and Confirmation Alum Geothermal Area Walker-Lane Transition Zone Geothermal Region Bald Mountain Geothermal Project Oski Energy LLC Susanville, California 20 MW20,000 kW 20,000,000 W 20,000,000,000 mW 0.02 GW 2.0e-5 TW Phase II - Resource Exploration and Confirmation Black Rock I Geothermal Project CalEnergy Generation Phase III - Permitting and Initial Development North Shore Mono Lake Geothermal Area Walker-Lane Transition Zone Geothermal Region

326

The Cave  

NLE Websites -- All DOE Office Websites (Extended Search)

las imágenes? las imágenes? El ejemplo de la caverna. Avanzar Volver Principal ESTOY PERDIDO!!! Caverna Suponga que usted tiene la mala suerte de caer en una caverna sin una linterna. Una pelota de básket Pero sí tiene la suficiente suerte de tener un balde lleno de pelotas de básket que brillan en la oscuridad. De pronto, usted oye una respiración. ¿Será un oso hambriento de sangre, o sólo sus amigos haciéndole una broma? Para averiguarlo, usted lanza desesperadamente las pelotas en la dirección del sonido, y memoriza las posiciones de los lugares en que las pelotas golpean. Logra así descifrar rápidamente el siguiente perfil del objeto frente a usted: Rayos! como las pelotas de básket son tan grandes, cuando rebotan con el objeto frente a Ud., sólo le permiten determinar que lo que está frente a

327

LAKESHORE AVON BR ANT-EDEN ALD EN-LANC ASTER AU BURN W SH ELDON  

U.S. Energy Information Administration (EIA) Indexed Site

81 81 § ¨ ¦ 81 LAKESHORE AVON BR ANT-EDEN ALD EN-LANC ASTER AU BURN W SH ELDON CALEDONIA HURON C REEK LEIC EST ER COL DEN ASH FORD INDIAN FALLS LAWTONS SAR DINIA RPD-037 -2 GLENWOOD PU LASKI PAVILION CON CORD COL LINS N ELM A ORC HARD PARK-H AMBU RG DANLEY CORNERS ST ILLWAT ER CHAFF EE-ARCAD E FAYETT E-WATERLOO LAKEVIEW JAVA SEN EC A W ELLER Y AU RORA E ZOAR BU FFALO TIOGA SILVER LAKE AKR ON ROM E RAT HBON E ALM A BET HANY WYOMING ULYSSES BR ANCH W SAN DY CREEK COL LINS BLOOMFIELD E LEBANON STATE LINE ALLEN CHUR CHVILLE BATH ATT ICA ELLI COT VILLE ROU LETT E BR ADFORD BU FFALO CREEK PEN N YAN N BEECH HILL-INDEPENDENC E GERRY-CH ARLOTTE STAGECOACH CHIPMUN K HEBRON VIN CENT BALD WI NSVILLE AKELEY OLEAN COWLESVILLE AN NIN SMET HPORT BR ADLEY BR OOK BU STI FIVE MILE BLOOMFIELD W SEN EC A FALLS NILE STAGECOACH LEWIS R UN BR ADFORD CAMDEN VAN ETT EN ROAN OKE SH ARON RICHBU RG FULTON N FINN EGAN H ILL TONAWANDA

328

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 7150 of 28,905 results. 41 - 7150 of 28,905 results. Download EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines http://energy.gov/nepa/downloads/eis-0365-epa-notice-availability-draft-environmental-impact-statement Download EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho http://energy.gov/nepa/downloads/eis-0471-notice-adoption-environmental-impact-statement Download ALPHABETICAL INDEX http://energy.gov/management/downloads/alphabetical-index Download Recommendations for the Supplement Analysis Process DOE has prepared this guidance regarding Supplement Analyses.The guidance discusses decisions regarding whether to prepare a Supplement Analysis

329

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 25640 of 28,904 results. 31 - 25640 of 28,904 results. Download CX-000230: Categorical Exclusion Determination Virginia County Henrico CX(s) Applied: B5.1 Date: 12/02/2009 Location(s): Henrico County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-000230-categorical-exclusion-determination Download CX-000012: Categorical Exclusion Determination Eagle Junction Clearwire Wireless Communication Facilities CX(s) Applied: B1.7, B1.15, B1.19 Date: 12/02/2009 Location(s): Polk County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000012-categorical-exclusion-determination Download CX-000102: Categorical Exclusion Determination Plainfield's Public Works Facility's Building and Parking Lot Lighting

330

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 24990 of 31,917 results. 81 - 24990 of 31,917 results. Download CX-000012: Categorical Exclusion Determination Eagle Junction Clearwire Wireless Communication Facilities CX(s) Applied: B1.7, B1.15, B1.19 Date: 12/02/2009 Location(s): Polk County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000012-categorical-exclusion-determination Download CX-006793: Categorical Exclusion Determination Provision of Funds to the Confederated Salish and Kootenai Tribes (CSKT) for Purchase of Squeque Lane Property CX(s) Applied: B1.25 Date: 09/13/2011 Location(s): Section Lake County, Montana Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006793-categorical-exclusion-determination Download CX-006794: Categorical Exclusion Determination

331

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 13350 of 28,905 results. 41 - 13350 of 28,905 results. Download CX-006540: Categorical Exclusion Determination Wells Fargo Property Structure Removal CX(s) Applied: B1.23 Date: 08/16/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-006540-categorical-exclusion-determination Download CX-006383: Categorical Exclusion Determination Project Eagle Direct Water Manufacturing Plants CX(s) Applied: B1.23, B1.31 Date: 07/28/2011 Location(s): Lexington, Massachusetts Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office http://energy.gov/nepa/downloads/cx-006383-categorical-exclusion-determination Download CX-005567: Categorical Exclusion Determination Energy Efficiency Retrofits and Conservation Plan

332

Attachment B  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B B : 22637 ~-'"~- ....... "D DOE024-0043 p.2 * CT - United States Department of the Interior 2800 (WY100) BUREAU OF LAND MANAGEMENT WYW-153987 Frncdalc Field Offce P.O. Box 768 Pincd.c. W 7 oming 82341-0768 October 25, 2001 CERTIIED MAIL 7000 0520 0021 8232 3869 RKEURN RECEIP REQUESTED DECISION Mr. Steven Degenfeldr : Double Eagle Petroleum & Mining Company : Application Received PO Box 766 October 9, 2001 Casper, WY 82602 pptcar on Rejectcd Re: Pipeline - Mesa 11-16 On October 9. 2001, you filed right-of-way aplication, WYW-153987, for a 4 inch temporary surface natural gas pipeline on lands in sections 21 an 22, T. 32 N-, R. 109 W., 6' Principle Meridian, Wyoming, under the authority of Section 28 of the Mineal Leasing act of 1920, as amended. It is Bureau of Land Management policy to reesw natural gas pipeline right-of-way applications with

333

DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Offers Conditional Loan Guarantee for Front End Nuclear DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in Idaho DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in Idaho May 20, 2010 - 12:00am Addthis Washington, DC - As part of a broad effort to expand the use of nuclear power in the United States and reduce carbon pollution, U.S. Secretary of Energy Steven Chu announced today the Department's first conditional commitment for a front-end nuclear facility. The $2 billion loan guarantee will support AREVA's Eagle Rock Enrichment Facility near Idaho Falls, Idaho, which will supply uranium enrichment services for the U.S. nuclear power industry. "Increasing uranium enrichment in the United States is critical to the nation's energy and national security," said Secretary Chu. "Existing

334

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 12880 of 26,764 results. 71 - 12880 of 26,764 results. Download EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho http://energy.gov/nepa/downloads/eis-0471-final-environmental-impact-statement-0 Download Special Report: IG-0538 Management Challenges at the Department of Energy http://energy.gov/ig/downloads/special-report-ig-0538 Download Site Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 http://energy.gov/lm/downloads/site-sustainability-plan-ssp-2013 Download Volume II, Environment, Safety, and Health Special Review of Work Practices for Nanoscale Material Activities at Department of Energy Laboratories, August 2008 At the request of the Secretary of Energy, the U.S. Department of Energy (DOE) Office of Independent Oversight, within the office of Health, Safety

335

U.S. Liquefied Natural Gas Exports to Japan  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

336

Status and outlook for shale gas and tight oil development in the U.S.  

Gasoline and Diesel Fuel Update (EIA)

American Petroleum Institute American Petroleum Institute April 04, 2013 | Washington, DC By Adam Sieminski, Administrator U.S. Shale Gas 2 Adam Sieminski , API, April 04, 2013 An average well in shale gas and other continuous resource plays can also have steep decline curves, which require continued drilling to grow production 3 0 500 1,000 1,500 2,000 0 5 10 15 20 Haynesville Eagle Ford Woodford Marcellus Fayetteville million cubic feet per year Source: EIA, Annual Energy Outlook 2012 1 0% 50% 100% 0 5 10 15 20 Cumulative production = EUR Adam Sieminski , API, April 04, 2013 For example: Oil production by monthly vintage of wells in the Williston Basin 4 Source: DrillingInfo history through August 2012, EIA Short-Term Energy Outlook, February 2013 forecast

337

U.S. Natural Gas Exports to Russia  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

338

Status and outlook for shale gas and tight oil development in the U.S.  

Gasoline and Diesel Fuel Update (EIA)

CERAWEEK 2013, North American Energy CERAWEEK 2013, North American Energy March 06, 2013 | Houston, TX by Adam Sieminski, Administrator U.S. Shale Gas 2 Adam Sieminski , CERAWEEK, March 06, 2013 An average well in shale gas and other continuous resource plays can also have steep decline curves, which require continued drilling to grow production 3 0 500 1,000 1,500 2,000 0 5 10 15 20 Haynesville Eagle Ford Woodford Marcellus Fayetteville million cubic feet per year Source: EIA, Annual Energy Outlook 2012 1 0% 50% 100% 0 5 10 15 20 Cumulative production = EUR Adam Sieminski , CERAWEEK, March 06, 2013 For example: Oil production by monthly vintage of wells in the Williston Basin 4 Source: DrillingInfo history through August 2012, EIA Short-Term Energy Outlook, February 2013 forecast

339

Status and outlook for shale gas and tight oil development in the U.S.  

Gasoline and Diesel Fuel Update (EIA)

Joint Forum on US Shale Gas & Pacific Gas Markets Joint Forum on US Shale Gas & Pacific Gas Markets May 14, 2013 | New York, NY By Adam Sieminski, Administrator U.S. Shale Gas 2 Adam Sieminski , May 14, 2013 Domestic production of shale gas has grown dramatically over the past few years Adam Sieminski , May 14, 2013 3 0 5 10 15 20 25 30 2000 2002 2004 2006 2008 2010 2012 Rest of US Marcellus (PA and WV) Haynesville (LA and TX) Eagle Ford (TX) Bakken (ND) Woodford (OK) Fayetteville (AR) Barnett (TX) Antrim (MI, IN, and OH) shale gas production (dry) billion cubic feet per day Sources: LCI Energy Insight gross withdrawal estimates as of March 2013 and converted to dry production estimates with EIA-calculated average gross-to-dry shrinkage factors by state and/or shale play. Shale gas leads growth in total gas production through 2040 to

340

DOE-Sponsored Field Test Demonstrates Viability of Simultaneous CO2 Storage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Test Demonstrates Viability of Simultaneous CO2 Field Test Demonstrates Viability of Simultaneous CO2 Storage and Enhanced Oil Recovery in Carbonate Reservoirs DOE-Sponsored Field Test Demonstrates Viability of Simultaneous CO2 Storage and Enhanced Oil Recovery in Carbonate Reservoirs June 28, 2010 - 1:00pm Addthis Washington, DC - A field test conducted by a U.S. Department of Energy (DOE) team of regional partners has demonstrated that using carbon dioxide (CO2) in an enhanced oil recovery method dubbed "huff-and-puff" can help assess the carbon sequestration potential of geologic formations while tapping America's valuable oil resources. The Plains CO2 Reduction (PCOR) Partnership, one of seven in DOE's Regional Carbon Sequestration Partnership program, collaborated with Eagle Operating Inc. to complete the test in the Northwest McGregor Oil Field in Williams

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:Ce8ed435-5a02-46aa-9a04-89602cea8562 | Open Energy Information  

Open Energy Info (EERE)

35-5a02-46aa-9a04-89602cea8562 35-5a02-46aa-9a04-89602cea8562 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase - Optional Time-of-Day 7am-7pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

342

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 11760 of 28,905 results. 51 - 11760 of 28,905 results. Download EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) http://energy.gov/nepa/downloads/ea-1905-final-environmental-assessment Download FAQS Reference Guide - Technical Program Manager This reference guide addresses the competency statements in the February 2004 edition of DOE-STD-1178-2004, Technical Program Manager Functional Area Qualification Standard. http://energy.gov/hss/downloads/faqs-reference-guide-technical-program-manager Download Inspection Report: IG-0716 Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory http://energy.gov/ig/downloads/inspection-report-ig-0716 Download DOE-HDBK-1115-98

343

Industrial SSP Partner Teaming Profile SWEPCO Intertape  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial SPP / Partner Teaming Profile Industrial SPP / Partner Teaming Profile Industrial Partner Intertape Polymer Group 1101 Eagle Springs Rd. Danville, VA 24540 Business: Specialized Polyolefin Plastic/Paper Products Mike Jones Manager of Engineering Phone: 434-797-8359 Email: mbjones@itape.com Service/Product Provider Southwestern Petroleum Corporation 534 N. Main St Fort Worth, TX 76164 Business: High Performance Lubricants Paul J. Dickerson Senior Vice President & COO Phone: 817-348-7275 Email: pjd@swepcousa.com Southwestern Petroleum Corporation (SWEPCO) captures "low-hanging fruit" with superior lubricants for Intertape Polymer Project Scope SWEPCO analyzed four problematic gear boxes at the Intertape Polymer Group facility in Danville, VA, which over-heated and tripped the circuit due to high amperage overload. SWEPCO implemented

344

CX-006560: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Categorical Exclusion Determination 60: Categorical Exclusion Determination CX-006560: Categorical Exclusion Determination Alaska-Tribe-Tanana Chief's Conference CX(s) Applied: B2.5, B5.1 Date: 09/06/2011 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy Energy Efficiency and Conservation Block Grant Program. The Tanana Chief?s Conference of Alaska proposes to conduct building retrofits on tribal facilities located in several tribal villages (Anvik, Arctic Village, Beaver, Huslia, Manley Hot Springs, Eagle, Tanacross, Dot Lake, Takona, Grayling, Northway, and Tanana). Building retrofits would include upgrading thermal roof insulation, installing new energy efficient windows, installing new insulated doors, upgrading door weather stripping, upgrading thermostats in the facilities, and conducting boiler recommissioning in

345

Michigan's 14th congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

4th congressional district: Energy Resources 4th congressional district: Energy Resources Jump to: navigation, search Equivalent URI DBpedia This article is a stub. You can help OpenEI by expanding it. This page represents a congressional district in Michigan. US Recovery Act Smart Grid Projects in Michigan's 14th congressional district Detroit Edison Company Smart Grid Project The Detroit Edison Company Smart Grid Demonstration Project Registered Energy Companies in Michigan's 14th congressional district DTE DTE Energy Venture formerly EdVenture Capital Corporation EaglePicher Horizon Batteries LLC Ford Ford Electric Battery Group Ford Motor Co Sustainable Technologies and Hybrid Programme General Motors NextEnergy Trenton Forging Utility Companies in Michigan's 14th congressional district Detroit Edison Co

346

Categorical Exclusion Determinations: Loan Guarantee Program Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee Program Office Loan Guarantee Program Office Categorical Exclusion Determinations: Loan Guarantee Program Office Categorical Exclusion Determinations issued by Loan Guarantee Program Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 6, 2011 CX-006488: Categorical Exclusion Determination Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering CX(s) Applied: B1.31, B5.1 Date: 09/06/2011 Location(s): Auburn Hills, Michigan Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office July 28, 2011 CX-006383: Categorical Exclusion Determination Project Eagle Direct Water Manufacturing Plants CX(s) Applied: B1.23, B1.31 Date: 07/28/2011 Location(s): Lexington, Massachusetts Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan

347

The Y-12 Times, Monthly Employee Newsletter for March 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 March 2008 www.y12.doe.gov/news/times.php P.O. Box 2009 Oak Ridge, TN 37831-8245 Managing Editor Melissa Leinart 865-574-1621 (6ml) Associate Editors Amy Alley Heidi Spurling Layout/Design Lisa Harris Contributors Ken Davis Karen Dixon Kathy Fahey Stuart Hames Jamie Loveday Patrick McCoy Brett Pate Cindy Robinson Ray Smith I N S I D E Page 2 Tips for staying healthy Page 3 Meet Y-12's Silver Eagles Page 4 Y-12's connection to outerspace Pages 6 Why did employees raise more than $830,000? Donna Watson Bill Wilburn Lisa Xiques times times the B&W Technical Services Y-12, LLC, a partnership between Babcock & Wilcox Technical Services Group Inc. and Bechtel National Inc., operates the Y-12 National Security Complex. The Y-12 National Security Complex recently hosted two distinguished visitors-Gen. Kevin P.

348

Megan Slack | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Megan Slack Megan Slack About Us Megan Slack - Deputy Director of Digital Content, White House Office of Digital Strategy Megan Slack Megan Slack is the Deputy Director of Digital Content in the White House Office of Digital Strategy. She joined the White House from the online communications team at the Center for American Progress. She also worked in The Huffington Post's Washington office and served as deputy finance director and scheduler on a congressional race in Houston, Texas during the 2008 election cycle. She holds a bachelor's degree in journalism from American University in Washington, D.C., where she served as editor in chief of the school newspaper, The Eagle. Most Recent President Obama Discusses Solar Power in Nevada March 22 Our Dependence on Foreign Oil Is Declining

349

Data:7d84af2f-c458-4906-941d-80620d01b8bc | Open Energy Information  

Open Energy Info (EERE)

f-c458-4906-941d-80620d01b8bc f-c458-4906-941d-80620d01b8bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

350

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 4160 of 29,416 results. 51 - 4160 of 29,416 results. Download CX-010191: Categorical Exclusion Determination Site Arc Flash Electrical Upgrades CX(s) Applied: B1.3, B2.5 Date: 04/16/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-010191-categorical-exclusion-determination Download CX-010194: Categorical Exclusion Determination Technology Integration Program Phase II Field Trial: Site One - Eagle Ford Shale CX(s) Applied: B3.11 Date: 04/15/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-010194-categorical-exclusion-determination Page Guidance on Reading the Scorecard The Site-level Regulatory Scorecard comprises three interrelated tables: (i) an aggregate red-yellow-green site summary, (ii) detailed text on

351

Hyperion Energy | Open Energy Information  

Open Energy Info (EERE)

Hyperion Energy Hyperion Energy Jump to: navigation, search Name Hyperion Energy Place Eagle, Idaho Zip 83616 Sector Renewable Energy Product Renewable energy developer converting waste and less valuable recyclables from the agricultural and food processing industry into valuable energy and/or distributive power in centralized project settings. Coordinates 42.878925°, -88.461354° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.878925,"lon":-88.461354,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

352

Data:83c2792e-7c9c-4778-a826-235645d0fcb4 | Open Energy Information  

Open Energy Info (EERE)

7c9c-4778-a826-235645d0fcb4 7c9c-4778-a826-235645d0fcb4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS Utility purchased Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

353

Data:83c84074-3f9e-47b3-8d4e-550c461934ad | Open Energy Information  

Open Energy Info (EERE)

-3f9e-47b3-8d4e-550c461934ad -3f9e-47b3-8d4e-550c461934ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

354

Data:02d4e5da-e857-4bb8-816b-71e9222807dd | Open Energy Information  

Open Energy Info (EERE)

da-e857-4bb8-816b-71e9222807dd da-e857-4bb8-816b-71e9222807dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Three Phase - Optional Time-of-Day 9am-9pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

355

EIS (DOE/EIS-0246/SA-17) Supplement Analysis for the Wildlife Management Program EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 13, 2001 September 13, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) Joe HeHerrera - KEWU Fish and Wildlife Project Manager Proposed Action: Eagle Lakes Ranch Acquisition and Restoration Project No: 2000-025-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee-Title Acquisition Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service (USFWS), Columbia National Wildlife Refuge Description of the Proposed Action: BPA proposes to partially fund the acquisition of 7,630 acres

356

Roaring Fork Valley - Energy Smart Program (Colorado) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Roaring Fork Valley - Energy Smart Program (Colorado) Roaring Fork Valley - Energy Smart Program (Colorado) Roaring Fork Valley - Energy Smart Program (Colorado) < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Manufacturing Appliances & Electronics Water Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009 State Colorado Program Type Local Rebate Program Rebate Amount 50% of the total costs of efficiency opportunities identified by the analyst, up to $500 $50 co-pay for energy assessments through the end of 2012, raising to $100 in 2013. Residents of Eagle, Pitkin and Gunnison Counties can participate in the Energy Smart Program. The Energy Smart Program helps residents identify,

357

U.S. Total Exports  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

358

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 2140 of 28,905 results. 31 - 2140 of 28,905 results. Download CX-002105: Categorical Exclusion Determination Washington-Tribal Energy Program-Upper Skagit Indian Tribe CX(s) Applied: A9, A11, B3.1 Date: 04/13/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy http://energy.gov/nepa/downloads/cx-002105-categorical-exclusion-determination Download EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho http://energy.gov/nepa/downloads/eis-0471-final-environmental-impact-statement-0 Download EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement Klondike III / Biglow Canyon Wind Integration Project, Sherman County, Oregon http://energy.gov/nepa/downloads/eis-0374-epa-notice-availability-final-environmental-impact-statement

359

Plains CO  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Partnership Fourth Annual Conference on Carbon Capture & Sequestration Alexandria, Virginia May 2-5, 2005 By Edward N. Steadman Plains CO Plains CO 2 2 Reduction Partnership Reduction Partnership Eagle Operating Inc. Fischer Oil and Gas, Inc. PCOR Partnership Region Nine states and three provinces 1,362,089 square miles Montana North Dakota South Dakota Minnesota Iowa Missouri Nebraska Saskatchewan Alberta Manitoba Wyoming Wisconsin Sedimentary Basins 440,828 square miles 32% of region Coal Fields 292,006 square miles 21% of region Evaluated the Wyodak- Anderson, Ardley, and Fort Union coals CO 2 sequestration capacity estimated to date: >8 billion tons PCOR Partnership Region Geological CO 2 sequestration capacity estimated thus far: >8 billion tons Saline Aquifers

360

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 18750 of 26,764 results. 41 - 18750 of 26,764 results. Download CX-002745: Categorical Exclusion Determination The Snake River Geothermal Drilling Project - Innovative Approaches to Geothermal Exploration CX(s) Applied: B3.1, A9 Date: 06/17/2010 Location(s): Twin Falls, Idaho Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-002745-categorical-exclusion-determination Download CX-002757: Categorical Exclusion Determination Drill One Exploratory Borehole on Lease Tract 15A by Golden Eagle Uranium CX(s) Applied: B3.1, B1.3 Date: 06/15/2010 Location(s): San Miguel County, Colorado Office(s): Legacy Management http://energy.gov/nepa/downloads/cx-002757-categorical-exclusion-determination Download CX-002766: Categorical Exclusion Determination

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

U.S. Liquefied Natural Gas Exports to United Kingdom  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

362

Status and outlook for shale gas and tight oil development in the U.S.  

Gasoline and Diesel Fuel Update (EIA)

Washington Association of Money Managers Washington Association of Money Managers April 18, 2013 | Washington, DC By Adam Sieminski, Administrator U.S. Shale Gas 2 Adam Sieminski , WAMM, April 18, 2013 An average well in shale gas and other continuous resource plays has steep decline curves Adam Sieminski , WAMM, April 18, 2013 3 0 500 1,000 1,500 2,000 0 5 10 15 20 Haynesville Eagle Ford Woodford Marcellus Fayetteville million cubic feet per year Source: EIA, Annual Energy Outlook 2012 1 0% 50% 100% 0 5 10 15 20 Cumulative production = EUR Oil production by monthly vintage of wells in the Williston Basin - production grows with continued drilling Adam Sieminski , WAMM, April 18, 2013

363

Data:51eb61ea-9b8c-4832-b154-882c37442aa4 | Open Energy Information  

Open Energy Info (EERE)

b8c-4832-b154-882c37442aa4 b8c-4832-b154-882c37442aa4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Three Phase - Optional Time-of-Day 7am-7pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

364

Data:Bf708fd6-8615-47a9-baf6-3b73ccfaa544 | Open Energy Information  

Open Energy Info (EERE)

fd6-8615-47a9-baf6-3b73ccfaa544 fd6-8615-47a9-baf6-3b73ccfaa544 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

365

Data:Bd988205-6a57-4ca8-b498-5c8092e93c80 | Open Energy Information  

Open Energy Info (EERE)

88205-6a57-4ca8-b498-5c8092e93c80 88205-6a57-4ca8-b498-5c8092e93c80 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-1 Residential Service Three Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

366

Category:Utility Rate Impacts on PV Economics By Location | Open Energy  

Open Energy Info (EERE)

Utility Rate Impacts on PV Economics By Location Utility Rate Impacts on PV Economics By Location Jump to: navigation, search Impact of Utility Rates on PV Economics Montgomery, AL Little Rock, AR Flagstaff, AZ Phoenix, AZ Tucson, AZ Arcata, CA LA, CA San Francisco, CA Boulder, CO Eagle County, CO Pueblo, CO Bridgeport, CT Wilmington, DE Miami, FL Tampa, FL Atlanta, GA Savannah, GA Des Moines, IA Mason, IA Boise, ID Chicago, IL Springfield, IL Indianapolis, IN Goodland, KS Wichita, KS Lexington, KY New Orleans, LA Shreveport, LA Boston, MA Baltimore, MD Caribou, ME Portland, ME Detroit, MI Houghton-Lake, MI Traverse City, MI International Falls, MN Minneapolis, MN Kansas City, MO Jackson, MS Billings, MT Greensboro, NC Wilmington, NC Bismarck, ND Minot, ND Omaha, NE Concord, NH Atlantic City, NJ Albuquerque, NM Las Vegas, NV Reno, NV New York, NY

367

NEWTON, Ask a Scientist at Argonne National Labs  

NLE Websites -- All DOE Office Websites (Extended Search)

Owl Predators Owl Predators Name: Mia Status: student Grade: K-3 Location: MN Country: USA Date: Winter 2011-2012 Question: What are the predators of a owl? Replies: Mia: Our largest adult owls have few predators. Smaller owls may be prey of other owls, long-eared owls are sometimes eaten by great horned owls, for example. Ground nesting owls, like short-eared owls, and especially nestlings, may be hunted by many predators, coyotes and other hawks and owls most likely. Nestlings of all birds, including owls may be hunted by other birds, raccoons, snakes and other animals that can climb trees. J. Elliott Hi Mia Predators of owls include: Opossums Racoons Hawks, Eagles and other raptors Other owls House cats Snakes that raid nests Accidents such as falling out of a nest, colliding with a tree, and electric power lines also contribute to owl mortality.

368

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 25830 of 28,904 results. 21 - 25830 of 28,904 results. Download CX-010147: Categorical Exclusion Determination Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 04/19/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010147-categorical-exclusion-determination Page Quality Management The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and... http://energy.gov/hss/quality-management Download Audit Report: OAS-L-07-18 Executive Compensation at Brookhaven National Laboratory http://energy.gov/ig/downloads/audit-report-oas-l-07-18 Article Photo of the Week: The Eagle Has Landed

369

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 18820 of 28,905 results. 11 - 18820 of 28,905 results. Download Special Report: OAS-RA-10-01 The Department of Energy's Quality Assurance Process for Prime Recipients' Reporting for the American Recovery and Reinvestment Act of 2009 http://energy.gov/ig/downloads/special-report-oas-ra-10-01 Download Mitigations for Security Vulnerabilities Found in Control System Networks http://energy.gov/oe/downloads/mitigations-security-vulnerabilities-found-control-system-networks Download Audit Report: IG-0863 The Department of Energy's $12.2 Billion Waste Treatment and Immobilization Plant - Quality Assurance Issues - Black Cell Vessels http://energy.gov/ig/downloads/audit-report-ig-0863 Download CX-007677: Categorical Exclusion Determination Project Eagle Phase 1 Direct Wafer/Cell Solar Facility

370

Roaring Fork Valley - Energy Smart Loan Program (Colorado) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Roaring Fork Valley - Energy Smart Loan Program (Colorado) Roaring Fork Valley - Energy Smart Loan Program (Colorado) Roaring Fork Valley - Energy Smart Loan Program (Colorado) < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Design & Remodeling Windows, Doors, & Skylights Appliances & Electronics Water Heating Program Info Funding Source American Recovery and Reinvestment Act State Colorado Program Type Local Loan Program Rebate Amount $1,000 for small projects and up to $25,000 Provider Roaring Fork Valley - Energy Smart Program Residents of Eagle, Gunnison or Pitkin Counties may be eligible for financing through the Energy Smart Program. Loans as low as $1,000 with flexible terms are available for small projects, and larger projects may

371

Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin  

U.S. Energy Information Administration (EIA) Indexed Site

Texas-Louisiana- Texas-Louisiana- Mississippi Salt Basin Greater Green River Basin W. Gulf Coast Basin Appalachian Basin Wind River Basin Eastern Shelf NW Shelf Abo Sussex-Shannon Muddy J Mesaverde- Lance-Lewis Medina/Clinton-Tuscarora Bradford-Venango-Elk Berea-Murrysville Piceance Basin Bossier Williston Basin Ft Worth Basin Davis Bighorn Basin Judith River- Eagle Permian Basin Anadarko Basin Denver Basin San Juan Basin North-Central Montana Area Uinta Basin Austin Chalk Codell-Niobrara Penn-Perm Carbonate Niobrara Chalk Dakota Morrow Mesaverde Thirty- One Cleveland Ozona Canyon Wasatch- Mesaverde Red Fork Mesaverde Granite Wash Stuart City-Edwards Bowdoin- Greenhorn Travis Peak Olmos Cotton Valley Vicksburg Wilcox Lobo Pictured Cliffs Cretaceous Cretaceous-Lower Tertiary Mancos- Dakota Gilmer Lime Major Tight Gas Plays, Lower 48 States

372

Property:Project City | Open Energy Information  

Open Energy Info (EERE)

City City Jump to: navigation, search Property Name Project City Property Type Page Pages using the property "Project City" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + Siadar, Lewis Western Isles Scotland + MHK Projects/ADM 3 + Galway, NULL + MHK Projects/ADM 4 + Onshore, NULL + MHK Projects/AW Energy EMEC + Orkney, Scotland + MHK Projects/AWS II + Orkney, Scotland + MHK Projects/Admirality Inlet Tidal Energy Project + Port Townsend, Washington + MHK Projects/Agucadoura + 5 km off Agucadoura, NULL + MHK Projects/Alaska 1 + Eagle, Alaska + MHK Projects/Alaska 13 + Ruby, Alaska + MHK Projects/Alaska 17 + Kaltag, Alaska + MHK Projects/Alaska 18 + Nulato, Alaska + MHK Projects/Alaska 24 + Kiana, Alaska +

373

Data:D2c86fec-dd50-4485-b638-365a79d904b8 | Open Energy Information  

Open Energy Info (EERE)

fec-dd50-4485-b638-365a79d904b8 fec-dd50-4485-b638-365a79d904b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase - Optional Time-of-Day 8am-8pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

374

DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Test Finds Potential for Permanent Storage of Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams DOE-Sponsored Field Test Finds Potential for Permanent Storage of CO2 in Lignite Seams November 4, 2010 - 1:00pm Addthis Washington, DC - A field test sponsored by the U.S. Department of Energy (DOE) has demonstrated that opportunities to permanently store carbon in unmineable seams of lignite may be more widespread than previously documented. This finding supports national efforts to address climate change through long-term storage of CO2 in underground geologic reservoirs. Lowering the core barrel at the PCOR Partnership lignite site.The PCOR Partnership, one of seven partnerships in DOE's Regional Carbon Sequestration Partnership Program, collaborated with Eagle Operating Inc. (Kenmare, N.D.) to complete the field test in Burke County, N.D. In March

375

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 820 of 28,905 results. 11 - 820 of 28,905 results. Download CX-006855: Categorical Exclusion Determination Rocket Centrifuge Removal (Eastern Side of TA-II) CX(s) Applied: B1.23 Date: 09/12/2011 Location(s): Albuquerque, New Mexico Office(s): NNSA-Headquarters, Golden Field Office http://energy.gov/nepa/downloads/cx-006855-categorical-exclusion-determination Download Independent Activity Report, Nevada National Security Site- July 2011 Review of Nevada National Security Site Device Assembly Facility Justification for Continued Operations for Inoperable HEPA-Filtered Ventilation System [HIAR-NNSS-2011-07-08] http://energy.gov/hss/downloads/independent-activity-report-nevada-national-security-site-july-2011-0 Download CX-010194: Categorical Exclusion Determination Technology Integration Program Phase II Field Trial: Site One - Eagle Ford

376

DOE/EA-1648: Final Environmental Assessment for the White Earth Nation Wind Energy Project Becker County, Minnesota, White Earth Indian Reservation, USA (April 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the for the White Earth Nation Wind Energy Project Becker County, Minnesota, White Earth Indian Reservation, U.S.A. April 2009 U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 DOE/EA # 1648 White Earth Nation Wind Energy Project Final Environmental Assessment White Earth Nation Reservation, Minnesota, U.S.A. DOE/EA # 1648 U.S. Department of Energy For further information concerning this document, the following person(s) may be contacted: Mike Triplett Planner White Earth Nation 35500 Eagle View Road P.O. Box 418 White Earth, MN 56591 218-983-4640 ext 5906 Steve Blazek NEPA Compliance Officer Department of Energy 1617 Cole Boulevard Golden, Colorado 80401 Steve.blazek@go.doe.gov.

377

Microsoft Word - LB-Lignite.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Name Organization E-Mail Darin Damiani, U.S. Department of Energy, Darin.Damiani@netl.doe.gov Principal Investigator Edward Steadman Field Test Information: Field Test Name Lignite in North Dakota Field Validation Test Test Location Section 36-T159N-R90W in Burke County, North Dakota Amount and Source of CO 2 Tons Less than 500 tons for the project Source Commercial source - Praxair Flatland Exploration Company, subsidiary of Fischer Oil and Gas ND State Land Department Eagle Operating, Inc. Schlumberger Field Test Partners (Primary Sponsors) Praxair Summary of Field Test Site and Operations: CO 2 in an Unminable Lignite Seam - The site for the pilot-scale CO 2 sequestration-enhanced coalbed methane (ECBM) project operated by the Energy & Environmental Research Center is

378

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects on Wedding Bell Mountain Lease Tract C-WM-17, Uranium Leasing Program A. BriefProject/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes several minor reclamation activities related to abandoned mines and mine features that pose a public safety concern. In 2007, LM inherited abandoned mines as a result of re-aligning lease tract boundaries.1pdependent contractors associated with the lessee (Golden Eagle Uranium) and under the supervision of uranium leasing program personnel would complete the work, and all projects would be completed within approximately 2 days. The Wedding Bell Mountain Lease

379

 

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B2.5 Safety and environmental improvements of a facility, replacement/upgrade of facility components B2.5 Safety and environmental improvements of a facility, replacement/upgrade of facility components The proposed energy efficiency retrofits include three individual activities to be funded with EECBG funds: * Activity #1 includes purchasing and installing up to 57 energy efficient furnaces in tribal residences to replace existing propane furnaces * Activity #2 includes conducting the following retrofits at the Eagle Butte Nutrition Center: - Replacing the building roof and insulating the attic space. The new roof will be equipped with gutters to capture and collect rain for use in local garden. - Replacing three skylights with windows on the west side of the building a Replacing the entrance doors * Activity #3 includes conducting the following retrofits at the Dupree Community Building:

380

Beamline 9.0.2  

NLE Websites -- All DOE Office Websites (Extended Search)

9.0.2 9.0.2 Beamline 9.0.2 Print Tuesday, 20 October 2009 08:59 Chemical Dynamics Scientific disciplines: Chemical dynamics, aerosol chemistry, imaging mass spectrometry, chemical kinetics, laser ablation and clusters, combustion and flames. Endstations: Molecular-beam photoelectron/photoion imaging and spectroscopy Flame chamber Ablation chamber Aerosol chamber Kinetics chamber GENERAL BEAMLINE INFORMATION Operational Yes Source characteristics 10-cm period undulator (U10) (fundamental) Energy range 7.4-30 eV Undulator beam White beam (straight undulator beam) Calculated flux (1.9 GeV, 400 mA) 1016 photons/s, 2.5%BW Spot size at sample 170 (h) x 50 (v) µm Monochromator #1 3-m Off-plane Eagle Calculated flux (1.9 GeV, 400 mA) 1014 photons/s, 0.1%BW Spot size at sample 400 (h) x 350 (v) µm

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

February 1  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2013 , 2013 CENTER SPOTLIGHT - University of Texas at Arlington http://www.compadre.org/ptec/quarknet/QuarkNet.cfm?ID=166 Contact Andy White for tips on hosting both students and teachers in a workshop. This year there were two main QuarkNet activities at UTA: the 2012 masterclass and a weeklong workshop for teachers. Six students from Eagle Mountain-Saginaw High School attended the masterclass on March 24. Andy White gave an introductory lecture, and students analyzed ATLAS data, "discovering" the Z boson and a new Z' boson! Following the masterclass, they received good feedback from the students who told their friends that they should have come. During a week in June, they held a workshop including talks on topics such as: Introduction to High Energy Physics, Basic Concepts, Particles and Forces, Introduction to

382

U.S. Natural Gas Exports to China  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

383

Petroleum & Other Liquids - U.S. Energy Information Administration (EIA) -  

Gasoline and Diesel Fuel Update (EIA)

‹ See All Petroleum Reports ‹ See All Petroleum Reports Drilling Productivity Report Release Date: December 9, 2013 | Next Release: January 13, 2014 | full report Previous Issue (pdf) month: December 2013 November 2013 October 2013 Go Contents Bakken Eagle Ford Haynesville Marcellus Niobrara Permian Year-over-year summary Explanatory notes and sources Full report Report data (aggregated by region) Frequently Asked Questions Related Today in Energy articles Marcellus region to provide 18% of total U.S. natural gas production this month Bakken oil production forecast to top 1 million barrels per day next month Production, depletion trends are keys to predicting natural gas and oil production Drilling efficiency is a key driver of oil and natural gas production Drilling often results in both oil and natural gas production

384

U.S. Liquefied Natural Gas Exports to India  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

385

U.S. Natural Gas Exports to Russia  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

386

Categorical Exclusion Determinations: Advanced Technology Vehicles  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Vehicles Technology Vehicles Manufacturing Loan Program Categorical Exclusion Determinations: Advanced Technology Vehicles Manufacturing Loan Program Categorical Exclusion Determinations issued by Advanced Technology Vehicles Manufacturing Loan Program. DOCUMENTS AVAILABLE FOR DOWNLOAD May 29, 2012 CX-008810: Categorical Exclusion Determination One Nevada Optimization of Microwave Telecommunication System CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada, Nevada Offices(s): Advanced Technology Vehicles Manufacturing Loan Program January 24, 2012 CX-007677: Categorical Exclusion Determination Project Eagle Phase 1 Direct Wafer/Cell Solar Facility CX(s) Applied: B1.31 Date: 01/24/2012 Location(s): Massachusetts Offices(s): Advanced Technology Vehicles Manufacturing Loan Program

387

Data:E43c47e3-ff4c-4587-a991-ed215d4e0aba | Open Energy Information  

Open Energy Info (EERE)

e3-ff4c-4587-a991-ed215d4e0aba e3-ff4c-4587-a991-ed215d4e0aba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 250 W HPS Utility purchased Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

388

Data:E537562d-6efd-4053-b484-838715616300 | Open Energy Information  

Open Energy Info (EERE)

2d-6efd-4053-b484-838715616300 2d-6efd-4053-b484-838715616300 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Three Phase - Optional Time-of-Day 8am-8pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

389

Categorical Exclusion Determinations: Carlsbad Field Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office Categorical Exclusion Determinations: Carlsbad Field Office Categorical Exclusion Determinations issued by Carlsbad Field Office. DOCUMENTS AVAILABLE FOR DOWNLOAD March 25, 2013 CX-010102: Categorical Exclusion Determination Lease of Office Space to support Waste Isolation Plant activities CX(s) Applied: B1.24 Date: 03/25/2013 Location(s): New Mexico, New Mexico Offices(s): Carlsbad Field Office February 5, 2013 CX-010101: Categorical Exclusion Determination Department of Energy Grant for the City of Carlsbad Improvement of the Double Eagle Well Field CX(s) Applied: A9, B1.7, B1.18 Date: 02/05/2013 Location(s): New Mexico Offices(s): Carlsbad Field Office August 10, 2011 CX-006626: Categorical Exclusion Determination Removal of Standard Waste Box - WIPP

390

I  

U.S. Energy Information Administration (EIA) Indexed Site

IV. Northern South America EIA/ARI World Shale Gas and Shale Oil Resource Assessment IV. Northern South America EIA/ARI World Shale Gas and Shale Oil Resource Assessment May 17, 2013 IV-1 IV. NORTHERN SOUTH AMERICA SUMMARY Northern South America has prospective shale gas and shale oil potential within marine- deposited Cretaceous shale formations in three main basins: the Middle Magdalena Valley and Llanos basins of Colombia, and the Maracaibo/Catatumbo basins of Venezuela and Colombia, Figure IV-1. The organic-rich Cretaceous shales (La Luna, Capacho, and Gacheta) sourced much of the conventional gas and oil produced in Colombia and western Venezuela, and are similar in age to the Eagle Ford and Niobrara shale plays in the USA. Ecopetrol, ConocoPhillips, ExxonMobil, Shell, and others have initiated shale exploration in Colombia.

391

Data:42b19534-fed8-4347-acff-0eb83406960a | Open Energy Information  

Open Energy Info (EERE)

b19534-fed8-4347-acff-0eb83406960a b19534-fed8-4347-acff-0eb83406960a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2008/01/01 End date if known: Rate name: RER-1 Renewable Energy Rider Sector: Description: Service under this rider is available to all customers currently served under Rate Schedules Rg-1, Gs-1, Cp-1, Cp-1 TOD, Cp-2, and Ms-1. Blocks are purchased for 300kWh at $3.00. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=1710 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

392

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-002776: Categorical Exclusion Determination California-City-Elk Grove CX(s) Applied: B2.5, A9, A11, B5.1 Date: 06/15/2010 Location(s): Elk Grove, California Office(s): Energy Efficiency and Renewable Energy June 15, 2010 CX-002757: Categorical Exclusion Determination Drill One Exploratory Borehole on Lease Tract 15A by Golden Eagle Uranium CX(s) Applied: B3.1, B1.3 Date: 06/15/2010 Location(s): San Miguel County, Colorado Office(s): Legacy Management June 15, 2010 CX-002775: Categorical Exclusion Determination Bridgeport Indian Colony of California CX(s) Applied: B2.5, B5.1 Date: 06/15/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy June 15, 2010 CX-002697: Categorical Exclusion Determination High Fidelity Multi-Phase Radiation Module for Modern Coal Combustion

393

CX-003332: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Categorical Exclusion Determination 2: Categorical Exclusion Determination CX-003332: Categorical Exclusion Determination Reclamation Projects on Wedding Bell Mountain Lease Tract C-WM-17, Uranium Leasing Program CX(s) Applied: B1.28 Date: 07/30/2010 Location(s): Montrose County, Colorado Office(s): Legacy Management The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes several minor reclamation activities related to abandoned mines and mine features that pose a public safety concern. In 2007, LM inherited abandoned mines as a result of re-aligning lease tract boundaries. Independent contractors associated with the lessee (Golden Eagle Uranium) and under the supervision of uranium leasing program personnel would complete the work, and all projects would be completed within approximately

394

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 24, 2011 August 24, 2011 CX-006776: Categorical Exclusion Determination Hills Creek-Lookout Point #1 Wood Pole and Access Road Maintenance CX(s) Applied: B1.3 Date: 08/24/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration August 24, 2011 CX-006591: Categorical Exclusion Determination Invasive Species Removal and Reclamation in Gold Eagle Mining, Incorporated CX(s) Applied: B1.3, B1.20 Date: 08/24/2011 Location(s): San Miguel County, Colorado Office(s): Legacy Management August 23, 2011 CX-007072: Categorical Exclusion Determination Install and Operate Chromate Water (CRW) Deionizer CX(s) Applied: B1.3 Date: 08/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management August 22, 2011 CX-006583: Categorical Exclusion Determination

395

Big Weasels  

NLE Websites -- All DOE Office Websites (Extended Search)

Big Weasels Big Weasels Nature Bulletin No. 512-A January 12, 1974 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation BIG WEASELS The Weasel Family includes the mink, skunks, otters, badger, martens and wolverine as well as the bloodthirsty little weasel -- all carnivorous fur-bearers having a pair of anal glands containing musky fluid which, except in the otters, badger and fisher, has a vile penetrating odor. The Pine Marten or American Sable, a little smaller than a house cat, is the tree-living member of the family. It dens and does much of its hunting in trees where it is a deadly enemy of squirrels and birds. On the ground it preys on marmots, chipmunks, hares, mice, grouse and reptiles. Honey, nuts and berries are eaten also. Aside from the lynx, eagles, owls and the fisher, a marten's chief enemy is man.

396

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 8400 of 26,764 results. 91 - 8400 of 26,764 results. Download Technical Standards Newsletter- March 1997 The Standards Forum and Standards Actions - March 1997 http://energy.gov/hss/downloads/technical-standards-newsletter-march-1997 Download EIS-0357: Notice of Intent to Prepare an Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, PA http://energy.gov/nepa/downloads/eis-0357-notice-intent-prepare-environmental-impact-statement Download CX-000012: Categorical Exclusion Determination Eagle Junction Clearwire Wireless Communication Facilities CX(s) Applied: B1.7, B1.15, B1.19 Date: 12/02/2009 Location(s): Polk County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000012-categorical-exclusion-determination

397

Notices  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

165 Federal Register 165 Federal Register / Vol. 77, No. 82 / Friday, April 27, 2012 / Notices Plan. EPA Region 10 sent a letter to the Alaska Department of Environmental Conservation on April 2, 2012, subsequent to the close of the comment period stating EPA found the Eagle River PM 10 Limited Maintenance Plan to be adequate for use in transportation conformity. Because limited maintenance plans do not contain budgets, as provided in 40 CFR 93.109(l), the adequacy review period for these maintenance plans serves to allow the public to comment on whether limited maintenance is appropriate for these areas. As a result of this adequacy finding, the Municipality of Anchorage, Alaska Department of Transportation & Public Facilities, and the U.S. Department of Transportation are no longer required to

398

Status and outlook for shale gas and tight oil development in the U.S.  

Gasoline and Diesel Fuel Update (EIA)

Council on Foreign Relations Council on Foreign Relations April 11, 2013 | Washington, DC By Adam Sieminski, Administrator U.S. Shale Gas 2 Adam Sieminski , CFR, April 11, 2013 An average well in shale gas and other continuous resource plays can also have steep decline curves, which require continued drilling to grow production 3 0 500 1,000 1,500 2,000 0 5 10 15 20 Haynesville Eagle Ford Woodford Marcellus Fayetteville million cubic feet per year Source: EIA, Annual Energy Outlook 2012 1 0% 50% 100% 0 5 10 15 20 Cumulative production = EUR Adam Sieminski , CFR, April 11, 2013 For example: Oil production by monthly vintage of wells in the Williston Basin 4 Source: Drilling Info history through August 2012, EIA Short-Term Energy Outlook, February 2013 forecast

399

U.S. Natural Gas Exports to Portugal  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

400

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2011 August 25, 2011 CX-006511: Categorical Exclusion Determination Improving Fuel Efficiency through Innovative Tire Design and Materials CX(s) Applied: A9 Date: 08/25/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 24, 2011 CX-006591: Categorical Exclusion Determination Invasive Species Removal and Reclamation in Gold Eagle Mining, Incorporated CX(s) Applied: B1.3, B1.20 Date: 08/24/2011 Location(s): San Miguel County, Colorado Office(s): Legacy Management August 17, 2011 ICEIWG Kick-Off Meeting Participant List August 16, 2011 CX-006540: Categorical Exclusion Determination Wells Fargo Property Structure Removal CX(s) Applied: B1.23 Date: 08/16/2011 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

U.S. Natural Gas Exports to Mexico  

Gasoline and Diesel Fuel Update (EIA)

Babb, MT Havre, MT Port of Morgan, MT Pittsburg, NH Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Kenai, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Sabine Pass, LA Period: Monthly Annual

402

BCS-BEC crossover in atomic Fermi gases with a narrow resonance  

SciTech Connect

We determine the effects on the BCS-BEC crossover of the energy dependence of the effective two-body interaction, which at low energies is determined by the effective range. To describe interactions with an effective range of either sign, we consider a single-channel model with a two-body interaction having an attractive square well and a repulsive square barrier. We investigate the two-body scattering properties of the model, and then solve the Eagles-Leggett equations for the zero temperature crossover, determining the momentum dependent gap and the chemical potential self-consistently. From this we investigate the dependence of the crossover on the effective range of the interaction.

Jensen, L. M. [NORDITA, Blegdamsvej 17, DK-2100, Copenhagen O (Denmark); Department of Physics, Nanoscience Center, University of Jyvaeskylae, P.O. Box 35, FIN-40014 Finland (Finland); Department of Theoretical Physics, Umeaa University, Umeaa, 901 87 (Sweden); Nilsen, H. M. [Center for Mathematics for Applications, P.O. Box 1053, Blindern, NO-0316, Oslo Norway (Norway); Watanabe, Gentaro [NORDITA, Blegdamsvej 17, DK-2100, Copenhagen O (Denmark); Institute of Chemical and Physical Research (RIKEN), 2-1 Hirosawa, Wako, Saitama 351-0198 (Japan)

2006-10-15T23:59:59.000Z

403

Minimization of Motion Smear: Reducing Avian Collision with Wind Turbines; Period of Performance: July 12, 1999 -- August 31, 2002  

Science Conference Proceedings (OSTI)

Collisions with wind turbines can be a problem for many species of birds. Of particular concern are collisions by eagles and other protected species. This research study used the laboratory methods of physiological optics, animal psychophysics, and retinal electrophysiology to analyze the causes of collisions and to evaluate visual deterrents based on the results of this analysis. Bird collisions with the seemingly slow-moving turbines seem paradoxical given the superb vision that most birds, especially raptors, possess. However, our optical analysis indicated that as the eye approaches the rotating blades, the retinal image of the blade (which is the information that is transmitted to the animal's brain) increases in velocity until it is moving so fast that the retina cannot keep up with it. At this point, the retinal image becomes a transparent blur that the bird probably interprets as a safe area to fly through, with disastrous consequences. This phenomenon is called"motion smear" or"motion blur."

Hodos, W.

2003-08-01T23:59:59.000Z

404

Self-discharge rate of lithium thionyl-chloride cells  

DOE Green Energy (OSTI)

Our low-rate lithium/thionyl-chloride ``D`` cell is required to provide power continuously for up to 10 years. The cell was designed at Sandia National Laboratories and manufactured at Eagle-Picher Industries, Joplin, Missouri. We have conducted accelerated aging studies at elevated temperatures to predict long-term performance of cells fabricated in 1992. Cells using 1.0M LiAlCl{sub 4} electrolyte follow Arrhenius kinetics with an activation energy of 14.6 Kcal/mol. This results in an annual capacity loss to self-discharge of 0.13 Ah at 25 C. Cells using a 1.0M LiAlCl{sub 4}{sm_bullet}SO{sub 2} electrolyte do not follow Arrhenius behavior. The performance of aged cells from an earlier fabrication lot is variable.

Cieslak, W.R.

1993-12-31T23:59:59.000Z

405

From the Editors---Brainstorming, Multiplicative Utilities, Partial Information on Probabilities or Outcomes, and Regulatory Focus  

Science Conference Proceedings (OSTI)

This is the final issue under this Editor-in-Chief, so this column is fittingly coauthored with the associate editors, whose terms also end with this issue, to emphasize their major role in the leadership of the journal. We first introduce incoming Editor-in-Chief ... Keywords: Eagle Airlines, QALYs, alternatives, applications, copula, correlation aversion, creation of, decision analysis, decision trees, dependence, editorial, framing, fuzzy logic, gains, health utility analysis, identification of, interval arithmetic, life-cycle consumption planning, losses, medical decision making, multiattribute utility theory, objectives, practice, public policy, regulatory focus, risk, risk aversion, risk proneness, self-regulation, sensitivity to dependence, simulation, standard gamble, time trade-off, uncertainty, value-focused brainstorming, value-focused thinking, verbal protocols

L. Robin Keller; Ali Abbas; J. Eric Bickel; Vicki M. Bier; David V. Budescu; John C. Butler; Enrico Diecidue; Robin L. Dillon-Merrill; Raimo P. Hmlinen; Kenneth C. Lichtendahl; Jason R. W. Merrick; Jay R. Simon; George Wu

2012-12-01T23:59:59.000Z

406

Status of improved lead-acid, nickel/iron, and nickel/zinc batteries being developed under DOE's electric vehicle battery program  

SciTech Connect

The significant progress achieved in each of the three battery systems since the initiation of this battery development program is described. The 1982 demonstrated accomplishments are verified test results obtained on multicell modules (typically three to six cells each) at NBTL through May 1982. In particular, significant technical progress has been made in extending battery life. Additional progress in cell development and battery subsystem design (chargers, watering systems, electrolyte management systems) has allowed the construction of full-size battery packs. Globe Battery Division (lead-acid), Westinghouse (nickel/iron), and Eagle-Picher (nickel/iron) delivered full-size batteries to the Jet Propulsion Laboratory (JPL) for in-vehicle testing and evaluation.

Miller, J.F.; Rajan, J.B.; Hornstra, F.; Christianson, C.C.; Yao, N.P.

1982-01-01T23:59:59.000Z

407

Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2004 Annual Report.  

DOE Green Energy (OSTI)

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Oceanic and Atmospheric Administration at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Oceanic and Atmospheric Administration are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2004 and December 31, 2004 for the hatchery element of the program are presented in this report. In 2004, twenty-seven anadromous sockeye salmon returned to the Sawtooth Valley. Traps on Redfish Lake Creek and the upper Salmon River at the Sawtooth Fish Hatchery intercepted one and four adults, respectively. Additionally, one adult sockeye salmon was collected at the East Fork Salmon River weir, 18 were seined from below the Sawtooth Fish Hatchery weir, one adult sockeye salmon was observed below the Sawtooth Fish Hatchery weir but not captured, and two adult sockeye salmon were observed in Little Redfish Lake but not captured. Fish were captured/collected between July 24 and September 14, 2004. The captured/collected adult sockeye salmon (12 females and 12 males) originated from a variety of release strategies and were transferred to Eagle Fish Hatchery on September 14, 2004 and later incorporated into hatchery spawn matrices. Nine anadromous females, 102 captive females from brood year 2001, and one captive female from brood year 2000 broodstock groups were spawned at the Eagle Hatchery in 2004. Spawn pairings produced approximately 140,823 eyed-eggs with egg survival to eyed stage of development averaging 72.8%. Eyed-eggs (49,134), presmolts (130,716), smolts (96), and adults (241) were planted or released into Sawtooth Valley waters in 2004. Reintroduction strategies involved releases to Redfish Lake, Alturas Lake, and Pettit Lake. During this reporting period, five broodstocks and five unique production groups were in culture at Idaho Department of Fish and Game (Eagle Fish Hatchery and Sawtooth Fish Hatchery) and Oregon Department of Fish and Wildlife (Oxbow Fish Hatchery) facilities. Two of the five broodstocks were incorporated into the 2004 spawning design.

Baker, Dan J.; Heindel, Jeff A.; Redding, Jeremy (Idaho Department of Fish and Game, Boise, ID)

2006-05-01T23:59:59.000Z

408

Snake River Sockeye Salmon Captive Broodstock Program : Hatchery Element : Annual Progress Report, 2000.  

SciTech Connect

On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Marine Fisheries Service at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Marine Fisheries Service are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases are also reported under separate cover. Captive broodstock program activities conducted between January 1, 2000 and December 31, 2000 are presented in this report.

Kline, Paul A.; Willard, Catherine

2001-04-01T23:59:59.000Z

409

Research, development, and demonstration of nickel-iron batteries for electric vehicle propulsion. Annual report, 1980  

DOE Green Energy (OSTI)

The objective of the Eagle-Picher nickel-iron battery program is to develop a nickel-iron battery for use in the propulsion of electric and electric-hybrid vehicles. To date, the program has concentrated on the characterization, fabrication and testing of the required electrodes, the fabrication and testing of full-scale cells, and finally, the fabrication and testing of full-scale (270 AH) six (6) volt modules. Electrodes of the final configuration have now exceeded 1880 cycles and are showing minimal capacity decline. Full-scale cells have presently exceeded 600 cycles and are tracking the individual electrode tests almost identically. Six volt module tests have exceeded 500 cycles, with a specific energy of 48 Wh/kg. Results to date indicate the nickel-iron battery is beginning to demonstrate the performance required for electric vehicle propulsion.

Not Available

1981-03-01T23:59:59.000Z

410

Microsoft Word - WIPP Water Line _2_ _2_ _2_  

NLE Websites -- All DOE Office Websites (Extended Search)

Announces the Transfer of the WIPP Water Line to Announces the Transfer of the WIPP Water Line to the City of Carlsbad CARLSBAD, N.M., June 18, 2009-The U.S. Department of Energy announced today that the Carlsbad Field Office will transfer the DOE-owned Waste Isolation Pilot Plant (WIPP) water line to the city of Carlsbad. The move will provide the city with an additional water supply while saving the Department of Energy thousands of dollars. DOE first installed the water line in 1984 to support the ongoing operations of the Department's disposal facility. It now transports water from the city-owned Double Eagle Water System wells to the plant. Under the finalized bill of sale, the city will take over complete responsibility for maintaining and repairing the pipeline in exchange for the water line. The city of Carlsbad also

411

DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Offers Conditional Loan Guarantee for Front End Nuclear DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in Idaho DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in Idaho May 20, 2010 - 12:00am Addthis Washington, DC - As part of a broad effort to expand the use of nuclear power in the United States and reduce carbon pollution, U.S. Secretary of Energy Steven Chu announced today the Department's first conditional commitment for a front-end nuclear facility. The $2 billion loan guarantee will support AREVA's Eagle Rock Enrichment Facility near Idaho Falls, Idaho, which will supply uranium enrichment services for the U.S. nuclear power industry. "Increasing uranium enrichment in the United States is critical to the nation's energy and national security," said Secretary Chu. "Existing

412

Data:27b7daa5-0505-44f2-9ab7-eca68101fed1 | Open Energy Information  

Open Energy Info (EERE)

daa5-0505-44f2-9ab7-eca68101fed1 daa5-0505-44f2-9ab7-eca68101fed1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS Non-Utility purchased Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

413

Alternative Fuels Data Center: Heavy-Duty Vehicle and Engine Search  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compatible Vehicles: Compatible Vehicles: Cargotec - Ottawa 4x2 Elgin Sweeper Company - Broom Bear/Crosswind/Eagle/Pelican North American Bus Industries - 60BRT North American Bus Industries - 31LFW / 35LFW / 40LFW ElDorado National - E-Z Rider II BRT ElDorado National - Axess ElDorado National - XHF Champion Bus Inc. - CTS - Front Engine Motor Coach Industries - D4500 CT Hybrid Commuter Coach Gillig Corp. - Diesel-Electric Hybrid Bus and CNG Bus Freightliner - Business Class M2 112 Blue Bird Corp. - All American Rear Engine Capacity Trucks - TJ9000 Heil Environmental - RapidRail McNeilus - Rear Load (Std, HD, XC, Tag, MS, Metro-Pak) McNeilus - CNG Cement Mixer North American Bus Industries - 42BRT Heil Environmental - DuraPack Python Heil Environmental - Rear Loader Thomas Built Buses - Saf-T-Liner HDX CNG

414

Environmental Impact Statements (EIS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho May 20, 2011 EIS-0468: Final Environmental Impact Statement Proposed American Centrifuge Plant in Piketon, Ohio Pike County, Ohio April 29, 2011 EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico March 25, 2011 EIS-0458: Draft Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA March 18, 2011 EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas March 11, 2011 EIS-0445: Draft Environmental Impact Statement

415

CX-007363: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-007363: Categorical Exclusion Determination Provision of Funds to the Kalispell Tribe to Purchase the West Calispell Road Conservation Easement CX(s) Applied: B1.25 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is providing funding to the Kalispel Tribe to conserve a 104-acre parcel in Pend Oreille County, Washington. The acquisition parcel was selected for protection due to the potential to restore altered riparian and wetland habitats for wildlife and resident fish species. Over time, the restoration of the property will provide habitat for ducks, osprey, eagles, and species dependant on forested wetlands to meet their life requirements. An unnamed tributary to Calispell

416

 

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This determination is limited to conducting energy audits and planning for potential energy efficiency improvements only. Subsequent activities This determination is limited to conducting energy audits and planning for potential energy efficiency improvements only. Subsequent activities involving implementation of energy efficiency improvements/retrofits/upgrades may not be conducted with EECBG funds without additional environmental review by DOE. The Tanana Chiefs Conference proposes to work with several tribes to hire a consultant for a portion of the EECBG funds to perform energy audits of select Tribal buildings. The Tanana Chiefs Conference Housing Department (TCC) and the Cold Climate Housing Research Center (CCHRC) have been selected to perform the audits and develop recommendations for potential energy efficiency improvements. The tribes include the Anvik, Arctic Village, Beaver, Dot Lake, Eagle, Grayling, Husila, Manley Hot Springs, Northway, Takotna, and Tanacross tribes. Upon completion of the

417

Ohio's 2nd congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

Ohio. Ohio. Registered Energy Companies in Ohio's 2nd congressional district AHL-TECH Ameridian Speciality Services CECO Environmental Corp CIMx Software Cinergy Ventures II LLC DELTEC INC Eagle Energy LLC Global Energy Inc Green Builder Media /Green Builder College Icon Solar Power, LLC Innovative Solutions Unlimited, LLC (InSolves) KATZEN International Inc Macy's Manuta Chemical Consulting Inc. Melink Industries Melink Solar OnPower Inc Pilus Energy SEMCO THOR Turner Hunt Ocean Renewable LLC The Utilities Group Inc Ultimate Best Buy LLC Vinyl Kraft Windows and Doors Vision Energy Energy Generation Facilities in Ohio's 2nd congressional district Melink Solar Canopy at the Cincinnati Zoo Retrieved from "http://en.openei.org/w/index.php?title=Ohio%27s_2nd_congressional_district&oldid=196998

418

What's InsIde?  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional Partner Launches Drilling Test in Regional Partner Launches Drilling Test in DOE's Carbon Sequestration Program." The Plains CO 2 Reduction Partnership (PCOR), one of the seven Department of Energy (DOE) Regional Carbon Sequestration Partnerships, has begun a small-scale geologic field test as part of their validation phase efforts which will focus on carbon dioxide (CO 2 ) storage in a lignite seam in Burke County, North Dakota. The PCOR Partnership, managed by the University of North Dakota's Energy and Environmental Research Center, will partner with Eagle Operating Inc. of Kenmare, North Dakota to conduct the two-year, two-phased test. During phase one, data about the coal seam will be collected in order to evaluate the

419

Comverge (New Jersey) | Open Energy Information  

Open Energy Info (EERE)

(New Jersey) (New Jersey) Jump to: navigation, search Name Comverge Address 120 Eagle Rock Avenue, Suite 190 Place East Hanover, New Jersey Zip 07936 Sector Efficiency Product Utility demand response system provider Website http://www.comverge.com/ Coordinates 40.8303322°, -74.3381524° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8303322,"lon":-74.3381524,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

420

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 22760 of 28,905 results. 51 - 22760 of 28,905 results. Download CX-002692: Categorical Exclusion Determination Drill One Exploratory Hole On Lease Tract C-WM-17 by Golden Eagle Uranium CX(s) Applied: B3.1, B1.3 Date: 06/02/2010 Location(s): Montrose County, Colorado Office(s): Legacy Management http://energy.gov/nepa/downloads/cx-002692-categorical-exclusion-determination Article Powerpedia Turns Two The Energy Department, inspired by the idea of creating a centralized hub for collaboration and information, launched its own internal wiki - Powerpedia - two years ago today. http://energy.gov/cio/articles/powerpedia-turns-two Article Help Build a Better Energy Information Administration Website The U.S. Energy Information Administration (EIA) is launching a beta website that encourages the public, researchers, analysts and others to

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 3590 of 29,416 results. 81 - 3590 of 29,416 results. Download CX-010391: Categorical Exclusion Determination Project to "Establish a Muon Gyromagnetic Ratio Measurement (g-2) Experiment within the Muon Campus CX(s) Applied: B1.30, B1.31, B3.10 Date: 12/20/2012 Location(s): Illinois Offices(s): Fermi Site Office http://energy.gov/nepa/downloads/cx-010391-categorical-exclusion-determination Download EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota http://energy.gov/nepa/downloads/eis-0469-notice-intent-prepare-environmental-impact-statement-and-conduct-scoping Download CX-010444: Categorical Exclusion Determination Technology Integration Program - Field Trial Site Two - Eagle Ford Shale,

422

Petroleum & Other Liquids - U.S. Energy Information Administration (EIA) -  

U.S. Energy Information Administration (EIA) Indexed Site

Petroleum & Other Liquids Petroleum & Other Liquids Glossary › FAQS › Overview Data Summary Prices Crude Reserves and Production Refining and Processing Imports/Exports & Movements Stocks Consumption/Sales All Petroleum & Other Liquids Data Reports Analysis & Projections Most Requested Consumption & Sales Crude Reserves & Production Imports/Exports & Movements Prices Projections Refining & Processing Stocks All Reports ‹ See All Petroleum Reports Drilling Productivity Report Release Date: December 9, 2013 | Next Release: January 13, 2014 | full report Previous Issue (pdf) month: December 2013 November 2013 October 2013 Go Contents Bakken Eagle Ford Haynesville Marcellus Niobrara Permian Year-over-year summary Explanatory notes and sources Full report Report data (aggregated by region)

423

Ward Co. Dunn Co. McLean Co. McHenry Co. Mountrail Co. McKenzie Co.  

U.S. Energy Information Administration (EIA) Indexed Site

WHISKEY JOE WHISKEY JOE WHITE ASH SPRING COULEE DES LACS MAGPIE HARTLAND BEICEGEL CREEK RANCH COULEE WINNER CRAZY MAN CREEK GROS VENTRE BANK W BULLSNAKE UPLAND COULEE REFUGE LARSON GARNET ALKALI CREEK PLUMER RATTLESNAKE POINT ELLSWORTH CHURCH BORDER HANSON GROVER HULSE COULEE SAKAKAWEA AURELIA ROUND TOP BUTTE GORHAM BUTTE W MARMON MANITOU SHEALEY CLAYTON SERGIS N SADDLE BUTTE HAYLAND CEDAR COULEE BOWLINE LITTLE BUTTE LONG CREEK RHOADES HEDBERG FILLMORE EIDSVOLD FAIRFIELD WOLF BAY TOBACCO GARDEN N SPRING VALLEY ARNEGARD STAFFORD RICHBURG PRESCOTT BULL MOOSE S PASSPORT PHELPS BAY STAMPEDE BIG GULCH BLACKTAIL WESTHOPE WESTBERG DRY CREEK BEARS TAIL MINNESOTA ANTELOPE CREEK BLUE RIDGE NEWBURG E GRASSLAND NORTHGATE PLEASANT S SANDROCKS EAGLE NEST BEAR BUTTE DOLLAR JOE BIG MEADOW BARTA CHARLIE BOB HEART BUTTE RPD_MCKENZIECO_2 VALLEY ROAD GREAT NORTHERN

424

Snake River Sockeye Salmon, Sawtooth Valley Project : 1992 Juvenile and Adult Trapping Program : Final Environmental Assessment.  

DOE Green Energy (OSTI)

Sockeye salmon (Oncorhynchus nerka) runs in the Snake River Basin have severely declined. Redfish Lake near Stanley, Idaho is the only lake in the drainage known to still support a run. In 1989, two adults were observed returning to this lake and in 1990, none returned. In the summer of 1991, only four adults returned. If no action is taken, the Snake River sockeye salmon will probably cease to exist. On November 20, 1991, the National Marine Fisheries Service (NMFS) declared the Snake River sockeye salmon ``endangered`` (effective December 20, 1991), pursuant to the Endangered Species Act (ESA) of 1973. In 1991, in response to a request from the Idaho Department of Fish and Game and the Shoshone-Bannock Tribes, the Bonneville Power Administration (BPA) funded efforts to conserve and begin rebuilding the Snake River sockeye salmon run. The initial efforts were focused on Redfish Lake in the Sawtooth Valley of southcentral Idaho. The 1991 measures involved: trapping some of the juvenile outmigrants (O. nerka) from Redfish Lake and rearing them in the Eagle Fish Health Facility (Idaho Department of Fish and Game) near Boise, Idaho; Upgrading of the Eagle Facility where the outmigrants are being reared; and trapping adult Snake River sockeye salmon returning to Redfish Lake and holding and spawning them at the Sawtooth Hatchery near Stanley, Idaho. This Environmental Assessment (EA) evaluates the potential environmental effects of the proposed actions for 1992. It has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) of 1969 and section 7 of the ESA of 1973.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

425

High-performance batteries for electric-vehicle propulsion and stationary energy storage. Progress report, October 1978-March 1979. [Ca/sulfides  

DOE Green Energy (OSTI)

This report covers the research, development, and management activities of the programs at Argonne National Laboratory (ANL) and at subcontractors' laboratories on high-temperature batteries during the period October 1978 to March 1979. These batteries are being developed for electric-vehicle propulsion and for stationary energy-storage applications. The present cells, which operate at 400 to 500/sup 0/C, are of a vertically oriented, prismatic design with one or more inner positive electrodes of FeS or FeS/sub 2/, facing electrodes of lithium-aluminum alloy, and molten LiCl-KCl electrolyte. During this six-month period, cell and battery development work continued at ANL, Eagle-Picher Industries, Inc., Gould Inc., and the Energy Systems Group of Rockwell International. Fabrication of a 40-kWh battery by Eagle-Picher for testing in an electric van is nearing completion. Cost and design studies for a Mark II electric-vehicle battery, which will have somewhat higher performance and use potentially low-cost materials and fabrication methods, were conducted by all three subcontractors, and contracts are being negotiated for development of Mark II batteries. Conceptual design studies continued at Rockwell International on a 100 MWh stationary energy-storage module. The present plan is to construct a module based on these designs for testing at the BEST (Battery Energy Storage Test) Facility. Work was also in progress at the Carborundum Co., General Motors Research Laboratories, and various other organizations on developing materials and components for cells. 38 figures, 28 tables.

None

1979-05-01T23:59:59.000Z

426

Effects of battery technologies, driving patterns, and climate comfort control on the performance of electric vehicles  

SciTech Connect

A computer software package, EAGLES, has been developed at Argonne National Laboratory to analyze electric vehicle (EV) performance. In this paper, we present EAGLES predictions of EV driving range, acceleration rate, and energy consumption under various driving patterns, with different battery technologies, and with assumptions concerning use of air conditioners and/or heaters for climate comfort control. The specifications of a baseline, four-passenger EV for given design performance requirements are established, assuming urban driving conditions represented by the Los Angeles 92 (LA-92) driving cycle and using battery characteristics similar to those of the United States Advanced Battery Consortium (USABC) midterm battery performance goals. To examine the impacts of driving patterns, energy consumption is simulated under three different driving cycles: the New York City Cycle, the Los Angeles 92 Cycle, and the ECE-15 Cycle. To test the impacts of battery technologies, performance attributes of an advanced lead-acid battery, the USABC midterm battery goals, and the USABC long-term battery goals are used. Finally, EV energy consumption from use of air conditioners and/or heaters under different climates is estimated and the associated driving range penalty for one European city (Paris) and two United States cities (Chicago and Los Angeles) is predicted. The results of this paper show the importance of considering various effects, such as battery technology, driving pattern, and climate comfort control, in the determination of EV performances. Electric vehicle energy consumption decreases more than 20% when a battery with characteristics similar to the USABC long-term goals is used instead of an advanced lead-acid battery.

Marr, W.W.; Wang, M.Q.; Santini, D.J.

1994-05-15T23:59:59.000Z

427

STUDY OF THE THREE-DIMENSIONAL CORONAL MAGNETIC FIELD OF ACTIVE REGION 11117 AROUND THE TIME OF A CONFINED FLARE USING A DATA-DRIVEN CESE-MHD MODEL  

Science Conference Proceedings (OSTI)

We apply a data-driven magnetohydrodynamics (MHD) model to investigate the three-dimensional (3D) magnetic field of NOAA active region (AR) 11117 around the time of a C-class confined flare that occurred on 2010 October 25. The MHD model, based on the spacetime conservation-element and solution-element scheme, is designed to focus on the magnetic field evolution and to consider a simplified solar atomsphere with finite plasma {beta}. Magnetic vector-field data derived from the observations at the photosphere is inputted directly to constrain the model. Assuming that the dynamic evolution of the coronal magnetic field can be approximated by successive equilibria, we solve a time sequence of MHD equilibria based on a set of vector magnetograms for AR 11117 taken by the Helioseismic and Magnetic Imager on board the Solar Dynamic Observatory around the time of the flare. The model qualitatively reproduces the basic structures of the 3D magnetic field, as supported by the visual similarity between the field lines and the coronal loops observed by the Atmospheric Imaging Assembly, which shows that the coronal field can indeed be well characterized by the MHD equilibrium in most cases. The magnetic configuration changes very little during the studied time interval of 2 hr. A topological analysis reveals that the small flare is correlated with a bald patch (BP, where the magnetic field is tangent to the photosphere), suggesting that the energy release of the flare can be understood by magnetic reconnection associated with the BP separatrices. The total magnetic flux and energy keep increasing slightly in spite of the flare, while the computed magnetic free energy drops during the flare by {approx}10{sup 30} erg, which seems to be adequate in providing the energy budget of a minor C-class confined flare.

Jiang Chaowei; Feng Xueshang [SIGMA Weather Group, State Key Laboratory for Space Weather, Center for Space Science and Applied Research, Chinese Academy of Sciences, Beijing 100190 (China); Wu, S. T.; Hu Qiang, E-mail: cwjiang@spaceweather.ac.cn, E-mail: fengx@spaceweather.ac.cn, E-mail: wus@uah.edu, E-mail: qh0001@uah.edu [Center for Space Plasma and Aeronomic Research, University of Alabama in Huntsville, Huntsville, AL 35899 (United States)

2012-11-10T23:59:59.000Z

428

Captive Rearing Program for Salmon River Chinook Salmon, 2000 Project Progress Report.  

SciTech Connect

During 2000, the Idaho Department of Fish and Game (IDFG) continued to develop techniques to rear chinook salmon Oncorhynchus tshawytscha to sexual maturity in captivity and to monitor their reproductive performance under natural conditions. Eyed-eggs were collected to establish captive cohorts from three study streams and included 503 eyed-eggs from East Fork Salmon River (EFSR), 250 from the Yankee Fork Salmon River, and 304 from the West Fork Yankee Fork Salmon River (WFYF). After collection, the eyed-eggs were immediately transferred to the Eagle Fish Hatchery, where they were incubated and reared by family group. Juveniles collected the previous summer were PIT and elastomer tagged and vaccinated against vibrio Vibrio spp. and bacterial kidney disease before the majority (approximately 75%) were transferred to the National Marine Fisheries Service, Manchester Marine Experimental Station for saltwater rearing through sexual maturity. Smolt transfers included 158 individuals from the Lemhi River (LEM), 193 from the WFYF, and 372 from the EFSR. Maturing fish transfers from the Manchester facility to the Eagle Fish Hatchery included 77 individuals from the LEM, 45 from the WFYF, and 11 from the EFSR. Two mature females from the WFYF were spawned in captivity with four males in 2000. Only one of the females produced viable eggs (N = 1,266), which were placed in in-stream incubators by personnel from the Shoshone-Bannock Tribe. Mature adults (N = 70) from the Lemhi River were released into Big Springs Creek to evaluate their reproductive performance. After release, fish distributed themselves throughout the study section and displayed a progression of habitat associations and behavior consistent with progressing maturation and the onset of spawning. Fifteen of the 17 suspected redds spawned by captive-reared parents in Big Springs Creek were hydraulically sampled to assess survival to the eyed stage of development. Eyed-eggs were collected from 13 of these, and survival ranged from 0% to 96%, although there was evidence that some eggs had died after reaching the eyed stage. Six redds were capped in an attempt to document fry emergence, but none were collected. A final hydraulic sampling of the capped redds yielded nothing from five of the six, but 75 dead eggs and one dead fry were found in the sixth. Smothering by fine sediment is the suspected cause of the observed mortality between the eyed stage and fry emergence.

Venditti, David A.

2002-04-01T23:59:59.000Z

429

Altering Reservoir Wettability to Improve Production from Single Wells  

Science Conference Proceedings (OSTI)

Many carbonate reservoirs are naturally fractured and typically produce less than 10% original oil in place during primary recovery. Spontaneous imbibition has proven an important mechanism for oil recovery from fractured reservoirs, which are usually weak waterflood candidates. In some situations, chemical stimulation can promote imbibition of water to alter the reservoir wettability toward water-wetness such that oil is produced at an economic rate from the rock matrix into fractures. In this project, cores and fluids from five reservoirs were used in laboratory tests: the San Andres formation (Fuhrman Masho and Eagle Creek fields) in the Permian Basin of Texas and New Mexico; and the Interlake, Stony Mountain, and Red River formations from the Cedar Creek Anticline in Montana and South Dakota. Solutions of nonionic, anionic, and amphoteric surfactants with formation water were used to promote waterwetness. Some Fuhrman Masho cores soaked in surfactant solution had improved oil recovery up to 38%. Most Eagle Creek cores did not respond to any of the tested surfactants. Some Cedar Creek anticline cores had good response to two anionic surfactants (CD 128 and A246L). The results indicate that cores with higher permeability responded better to the surfactants. The increased recovery is mainly ascribed to increased water-wetness. It is suspected that rock mineralogy is also an important factor. The laboratory work generated three field tests of the surfactant soak process in the West Fuhrman Masho San Andres Unit. The flawlessly designed tests included mechanical well clean out, installation of new pumps, and daily well tests before and after the treatments. Treatments were designed using artificial intelligence (AI) correlations developed from 23 previous surfactant soak treatments. The treatments were conducted during the last quarter of 2006. One of the wells produced a marginal volume of incremental oil through October. It is interesting to note that the field tests were conducted in an area of the field that has not met production expectations. The dataset on the 23 Phosphoria well surfactant soaks was updated. An analysis of the oil decline curves indicted that 4.5 lb of chemical produced a barrel of incremental oil. The AI analysis supports the adage 'good wells are the best candidates.' The generally better performance of surfactant in the high permeability core laboratory tests supports this observation. AI correlations were developed to predict the response to water-frac stimulations in a tight San Andres reservoir. The correlations maybe useful in the design of Cedar Creek Anticline surfactant soak treatments planned for next year. Nuclear Magnetic Resonance scans of dolomite cores to measure porosity and saturation during the high temperature laboratory work were acquired. The scans could not be correlated with physical measurement using either conventional or AI methods.

W. W. Weiss

2006-09-30T23:59:59.000Z

430

Data:F9a5d780-0e16-49ec-b036-c653051c7af7 | Open Energy Information  

Open Energy Info (EERE)

a5d780-0e16-49ec-b036-c653051c7af7 a5d780-0e16-49ec-b036-c653051c7af7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase -Optional Time-of-Day 8am-8pm with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

431

U.S. Natural Gas Exports to Portugal  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

432

NETL F 451.1/1-1, Categorical Exclusion Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DE-AC26-07NT42677 DE-AC26-07NT42677 RPSEA FE Multiple SCNGO FY13-15/36 months Gary Covatch LaSalle County, TX Technology Integration Program Phase II Field Trial: Site One - Eagle Ford Shale (SUMMARY CX) Field activity photography and videography, field data collection, air quality analysis, comparison of water treatment technologies, mitigation of vehicle traffic site impacts, and site/project management. Gary L. Covatch Digitally signed by Gary L. Covatch DN: cn=Gary L. Covatch, o=NETL, ou=SCNGO, email=gary.covatch@netl.doe.gov, c=US Date: 2013.03.21 09:48:47 -04'00' 03 21 2013 Pierina Fayish Digitally signed by Pierina Fayish DN: cn=Pierina Fayish, o, ou, email=pierina.fayish@netl.doe.gov, c=US Date: 2013.04.15 09:12:23 -04'00' 04 15 2013 List of prime and subcontractors for this location supplied to NCO. DE-AC26-07NT42677 Ultra-Deepwater

433

Data:F82e4c6b-834a-4896-b1a8-34228d8a4401 | Open Energy Information  

Open Energy Info (EERE)

e4c6b-834a-4896-b1a8-34228d8a4401 e4c6b-834a-4896-b1a8-34228d8a4401 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

434

U.S. Liquefied Natural Gas Exports to Spain  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

435

U.S. Liquefied Natural Gas Exports to United Kingdom  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

436

Data:Ae74357e-4e71-46ae-8875-1f09d23cbb20 | Open Energy Information  

Open Energy Info (EERE)

7e-4e71-46ae-8875-1f09d23cbb20 7e-4e71-46ae-8875-1f09d23cbb20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

437

PERFORMANCE STATISTICS WEIghTS  

NLE Websites -- All DOE Office Websites (Extended Search)

365 lbs 365 lbs Delivered Curb Weight: 4510 lbs Distribution F/R: 57/43 % GVWR: 5520 lbs GAWR F/R: 2865/2865 lbs Payload: 1010 lbs Performance Goal: 400 lbs DIMENSIONS Wheelbase: 107.0 inches Track F/R: 62/61.2 inches Length: 187.2 inches Width: 72.6 inches Height: 66.4 inches Ground Clearance: 7.1 inches Performance Goal: 5.0 inches TIRES Tire Mfg: Goodyear Tire Model: Eagle RS-A Tire Size: P215/55R18 Tire Pressure F/R: 30/30 psi Spare Installed: Yes ENgINE Model: 3MZ-FE Output: 208 hp @ 5600 rpm Configuration: DOHC V6 Displacement: 3.3 L Fuel Tank Capacity: 17.2 Gallons Fuel Type: Unleaded Gasoline © 2010 Electric Transportation Applications All Rights Reserved VEhICLE FEATuRES Base Vehicle: 2006 Lexus RX 400h VIN: JTJHW31U160002575 Seatbelt Positions: Five

438

U.S. Natural Gas Exports to Chile  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

439

U.S. Liquefied Natural Gas Exports To Brazil  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

440

Data:8ac99c9d-a34f-46b0-a864-403ca99bb0fa | Open Energy Information  

Open Energy Info (EERE)

c9d-a34f-46b0-a864-403ca99bb0fa c9d-a34f-46b0-a864-403ca99bb0fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:9c61013f-0a4c-4d1b-94a5-d4252d866996 | Open Energy Information  

Open Energy Info (EERE)

f-0a4c-4d1b-94a5-d4252d866996 f-0a4c-4d1b-94a5-d4252d866996 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2002/12/03 End date if known: Rate name: Customer-Owned Generation Systems(Greater than 20kW) Sector: Description: Available for single phase and three phase customers where a part or all of the electrical requirement of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capacity of greater than 20kW and less than or equal to 100kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate. Customers with generating facilities greater than 100 kW can negotiate a buy-back rate. Should the utility be unwilling to pay the minimum rate for electrical energy, the utility shall agree to transport such electrical energy to another utility that will pay such minimum rate.

442

Data:F22065d1-91c6-4716-8eec-df7531c7c283 | Open Energy Information  

Open Energy Info (EERE)

d1-91c6-4716-8eec-df7531c7c283 d1-91c6-4716-8eec-df7531c7c283 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

443

Data:90c3e58c-f978-477c-8f09-e6d8f076c0b8 | Open Energy Information  

Open Energy Info (EERE)

c3e58c-f978-477c-8f09-e6d8f076c0b8 c3e58c-f978-477c-8f09-e6d8f076c0b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

444

Development of an advanced process for drying fine coal in an inclined fluidized bed  

SciTech Connect

The objective of this research project was to demonstrate a technically feasible and economically viable process for drying and stabilizing high-moisture subbituminous coal. Controlled thermal drying of coal fines was achieved using the inclined fluidized-bed drying and stabilization process developed by the Western Research Institute. The project scope of work required completion of five tasks: (1) project planning, (2) characterization of two feed coals, (3) bench-scale inclined fluidized-bed drying studies, (4) product characterization and testing, and (5) technical and economic evaluation of the process. High moisture subbituminous coals from AMAX Eagle Butte mine located in the Powder River Basin of Wyoming and from Usibelli Coal Mine, Inc. in Healy, Alaska were tested in a 10-lb/hr bench-scale inclined fluidized-bed. Experimental results show that the dried coal contains less than 1.5% moisture and has a heating value over 11,500 Btu/lb. The coal fines entrainment can be kept below 15 wt % of the feed. The equilibrium moisture of dried coal was less than 50% of feed coal equilibrium moisture. 7 refs., 60 figs., 47 tabs.

Boysen, J.E.; Cha, C.Y.; Barbour, F.A.; Turner, T.F.; Kang, T.W.; Berggren, M.H.; Hogsett, R.F.; Jha, M.C.

1990-02-01T23:59:59.000Z

445

Data:88e7d0a8-99e4-4d52-a10a-30dd039a3e38 | Open Energy Information  

Open Energy Info (EERE)

a8-99e4-4d52-a10a-30dd039a3e38 a8-99e4-4d52-a10a-30dd039a3e38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

446

Data:1e1ced94-e8e7-4daf-bf9e-d290eb1e47fc | Open Energy Information  

Open Energy Info (EERE)

ced94-e8e7-4daf-bf9e-d290eb1e47fc ced94-e8e7-4daf-bf9e-d290eb1e47fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase - Optional Time-of-Day 9am-9pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

447

Data:5044ea01-7934-4d28-98e8-1ca70cd7559d | Open Energy Information  

Open Energy Info (EERE)

ea01-7934-4d28-98e8-1ca70cd7559d ea01-7934-4d28-98e8-1ca70cd7559d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand with Parallel Generation(20kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

448

Data:5805ae80-0c1d-4b29-bf6b-5a22dcef04ce | Open Energy Information  

Open Energy Info (EERE)

0-0c1d-4b29-bf6b-5a22dcef04ce 0-0c1d-4b29-bf6b-5a22dcef04ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service above 200kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

449

Data:5442f5ef-be5f-4de3-bd5f-ea134cca06ba | Open Energy Information  

Open Energy Info (EERE)

f5ef-be5f-4de3-bd5f-ea134cca06ba f5ef-be5f-4de3-bd5f-ea134cca06ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 250 W HPS Non-Utility purchased Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

450

Completed EISs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completed EISs Completed EISs Number of EISs in report: 294 Number Title Prog Office Ops Office Federal Register Notices Notice Date Citation Agency Areva Eagle Rock Enrichment Facility, Bonneville County, Idaho (Adopted) LP DOE/EIS-0471 5/20/2011 EPA 76 FR 29240 Adopted American Centrifuge Plant in Piketon, Pike County, Ohio (Adopted) LP DOE/EIS-0468 5/20/2011 EPA 76 FR 29240 Adopted Cushman Hydroelectric Project, Mason County, Washington (Adopted) EE DOE/EIS-0456 10/8/2010 EPA 75 FR 62386 NOA FEIS 11/29/2010 DOE 75 FR 73059 ROD Genesis Solar Energy Project, California (also identified as NextEra - Ford Dry Lake Solar Project) (Adopted) LP DOE/EIS-0455 11/23/2009 BLM 74 FR 61167 NOI 4/9/2010 BLM 75 FR 18204 NOA DEIS 8/27/2010 EPA 75 FR 52736 NOA FEIS 8/30/2010 BLM 75 FR 52966 NOA FEIS 12/17/2010 EPA 75 FR 78992

451

Data:B0b670a2-002a-43de-a3bb-5b4a6f76d972 | Open Energy Information  

Open Energy Info (EERE)

b670a2-002a-43de-a3bb-5b4a6f76d972 b670a2-002a-43de-a3bb-5b4a6f76d972 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

452

U.S. LNG Imports from Canada  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

453

U.S. Liquefied Natural Gas Exports to India  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

454

Data:0f832dc5-e2de-4d02-8883-47ed71bfa9fa | Open Energy Information  

Open Energy Info (EERE)

32dc5-e2de-4d02-8883-47ed71bfa9fa 32dc5-e2de-4d02-8883-47ed71bfa9fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: djustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

455

U.S. Liquefied Natural Gas Exports to Japan  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

456

Data:C0f75eae-3a2c-4ca3-930e-7b146b63eca9 | Open Energy Information  

Open Energy Info (EERE)

eae-3a2c-4ca3-930e-7b146b63eca9 eae-3a2c-4ca3-930e-7b146b63eca9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

457

NETL F 451.1/1-1, Categorical Exclusion Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AC26-07NT42677 AC26-07NT42677 RPSEA FE Multiple SCNGO FY13-16/36 months Gary Covatch Multiple sites, Multiple states Technology Integration Program - Field Trial Site Two - Eagle Ford Shale, DeWitt County, Texas SUMMARY CX to cover air emissions measurements, water quality screening, soil/livestock impact analysis, invasive species survey, community/public studies, documentation, and off-site lab work. Gary L. Covatch Digitally signed by Gary L. Covatch DN: cn=Gary L. Covatch, o=NETL, ou=SCNGO, email=gary.covatch@netl.doe.gov, c=US Date: 2013.06.17 09:27:21 -04'00' 06 17 2013 John Ganz Digitally signed by John Ganz DN: cn=John Ganz, o=NETL, ou=ECD, email=john.ganz@netl.doe.gov, c=US Date: 2013.06.19 13:42:11 -04'00' 6 19 2013 Summary CX covers field activities in DeWitt County, TX and lab-scale work in College Station, TX,

458

Data:Ffb6a527-50d0-40bf-9338-83aad8aec5d8 | Open Energy Information  

Open Energy Info (EERE)

Ffb6a527-50d0-40bf-9338-83aad8aec5d8 Ffb6a527-50d0-40bf-9338-83aad8aec5d8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service above 200kW Demand with Parallel Generation(20kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

459

Data:2484a189-1a86-465a-9969-a93fa92fb7bd | Open Energy Information  

Open Energy Info (EERE)

a189-1a86-465a-9969-a93fa92fb7bd a189-1a86-465a-9969-a93fa92fb7bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Three Phase - Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

460

Data:4bb51b9e-d2d0-4b89-b7c6-dacf5ea6eb4b | Open Energy Information  

Open Energy Info (EERE)

bb51b9e-d2d0-4b89-b7c6-dacf5ea6eb4b bb51b9e-d2d0-4b89-b7c6-dacf5ea6eb4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase - Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

Note: This page contains sample records for the topic "bald eagle haliaeetus" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Data:76a48ca3-e92f-4ef2-b3c3-ab37c05c377a | Open Energy Information  

Open Energy Info (EERE)

a48ca3-e92f-4ef2-b3c3-ab37c05c377a a48ca3-e92f-4ef2-b3c3-ab37c05c377a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

462

Data:8fedf6a3-77ff-4cd4-9e32-a425b40eb8ed | Open Energy Information  

Open Energy Info (EERE)

fedf6a3-77ff-4cd4-9e32-a425b40eb8ed fedf6a3-77ff-4cd4-9e32-a425b40eb8ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase - Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

463

U.S. Natural Gas Exports to Mexico  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

464

Data:Fa0d162a-6f75-4f07-92c5-5bcd4c314b81 | Open Energy Information  

Open Energy Info (EERE)

d162a-6f75-4f07-92c5-5bcd4c314b81 d162a-6f75-4f07-92c5-5bcd4c314b81 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-1 Residential Service Single Phase with Parallel Generation(20kW or less)-Net Energy Billing Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

465

Data:49c1ca87-2785-43c3-8a03-d5062e1daa56 | Open Energy Information  

Open Energy Info (EERE)

ca87-2785-43c3-8a03-d5062e1daa56 ca87-2785-43c3-8a03-d5062e1daa56 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Commercial Description: djustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

466

U.S. Energy Information Administration (EIA) - Sector  

Gasoline and Diesel Fuel Update (EIA)

6. Attributes of unproved technically recoverable tight oil resources as of January 1, 2010 6. Attributes of unproved technically recoverable tight oil resources as of January 1, 2010 Basin/Play Area (square miles) Average well spacing (wells per square mile) Percent of area untested Percent of area with potential Average EUR (million barrels per well) Number of potential wells TRR (million barrels) Western Gulf Austin Chalk 16,078 3 72 61 0.13 21,165 2,688 Eagle Ford 3,200 5 100 54 0.28 8,665 2,461 Anadarko Woodford 3,120 6 100 88 0.02 16,375 393 Permian Avalon/Bone Springs 1,313 4 100 78 0.39 4,085 1,593 Spraberry 1,085 6 99 72 0.11 4,636 510 Rocky Mountain basins Niobrara 20,385 8 97 80 0.05 127,451 6,500 Williston Bakkena 6,522 2 77 97 0.55 9,767 5,372

467

U.S. Energy Information Administration (EIA) - Sector  

Gasoline and Diesel Fuel Update (EIA)

7. Estimated ultimate recovery for selected shale gas plays in three AEOs (billion cubic feet per well) 7. Estimated ultimate recovery for selected shale gas plays in three AEOs (billion cubic feet per well) AEO2010 AEO2011 AEO2012 Basin/Play Range Average Range Average Range Average Appalachian Marcellus 0.25-0.74 0.49 0.86-4.66 1.62 0.02-7.80 1.56 Utica -- -- -- -- 0.10-2.75 1.13 Arkoma Woodford 1.43-4.28 2.85 3.00-5.32 4.06 0.40-4.22 1.97 Fayetteville 0.91-2.73 1.82 0.86-2.99 2.03 0.19-3.22 1.30 Chattanooga -- -- -- -- 0.14-1.94 0.99 Caney -- -- -- -- 0.05-0.66 0.34 TX-LA-MS Salt Haynesville/Boosier 2.30-6.89 4.59 1.13-8.65 3.58 0.08-5.76 2.67 Western Gulf Eagle Ford 1.10-3.29 2.19 1.73-7.32 2.63 0.41-4.93 2.36 Pearsall -- -- -- -- 0.12-2.91 1.22

468

U.S. Natural Gas Exports to Russia  

Gasoline and Diesel Fuel Update (EIA)

Warroad, MN Babb, MT Havre, MT Port of Morgan, MT Sherwood, ND Pittsburg, NH Buffalo, NY Grand Island, NY Massena, NY Niagara Falls, NY Waddington, NY Sumas, WA Sweetgrass, MT Total to Chile Sabine Pass, LA Total to China Kenai, AK Sabine Pass, LA Total to India Freeport, TX Sabine Pass, LA Total to Japan Cameron, LA Freeport, TX Kenai, AK Port Nikiski, AK Sabine Pass, LA Total to Mexico Douglas, AZ Nogales, AZ Calexico, CA Ogilby Mesa, CA Otay Mesa, CA San Diego, CA Alamo, TX Clint, TX Del Rio, TX Eagle Pass, TX El Paso, TX Hidalgo, TX McAllen, TX Penitas, TX Rio Bravo, TX Roma, TX Total to Portugal Sabine Pass, LA Total to Russia Kenai, AK Total to South Korea Freeport, TX Sabine Pass, LA Total to Spain Cameron, LA Sabine Pass, LA Total to United Kingdom Freeport, TX Sabine Pass, LA LNG Exports from Cameron, LA LNG Exports from Kenai, AK LNG Exports from Freeport, TX LNG Exports from Nogales, AZ LNG Exports from Otay Mesa, CA LNG Exports from Sabine Pass, LA LNG Exports from Sweetgrass, MT Period: Monthly Annual

469

MHK Projects/Alaska 1 | Open Energy Information  

Open Energy Info (EERE)

{"text":"","title":"","link":null,"lat":64.7881,"lon":-141.199,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]} {"text":"","title":"","link":null,"lat":64.7881,"lon":-141.199,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]} Project Profile Project Start Date 1/1/2007 Project City Eagle, AK Project State/Province Alaska Project Country United States Coordinates 64.7881°, -141.199° Project Phase Phase 0 Main Overseeing Organization Hydro Green Energy Project Licensing Environmental Monitoring and Mitigation Efforts See Tethys << Return to the MHK database homepage

470

Characterization of Epitaxial Film Silicon Solar Cells Grown on Seeded Display Glass: Preprint  

DOE Green Energy (OSTI)

We report characterizations of epitaxial film crystal silicon (c-Si) solar cells with open-circuit voltages (Voc) above 560 mV. The 2-um absorber cells are grown by low-temperature (<750 degrees C) hot-wire CVD (HWCVD) on Corning EAGLE XG display glass coated with a layer-transferred (LT) Si seed. The high Voc is a result of low-defect epitaxial Si (epi-Si) growth and effective hydrogen passivation of defects. The quality of HWCVD epitaxial growth on seeded glass substrates depends on the crystallographic quality of the seed and the morphology of the epitaxial growth surface. Heterojunction devices consist of glass/c-Si LT seed/ epi n+ Si:P/epi n- Si:P/intrinsic a-Si:H/p+ a-Si:H/ITO. Similar devices grown on electronically 'dead' n+ wafers have given Voc {approx}630 mV and {approx}8% efficiency with no light trapping features. Here we study the effects of the seed surface polish on epi-Si quality, how hydrogenation influences the device character, and the dominant junction transport physics.

Young, D. L.; Grover, S.; Teplin, C.; Stradins, P.; LaSalvia, V.; Chuang, T. K.; Couillard, J. G.; Branz, H. M.

2012-06-01T23:59:59.000Z

471

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

472

A Progress Report on the Characterization and Modeling of a Very Flexible Wind Turbine Design  

DOE Green Energy (OSTI)

The combination of increasing turbine rotor diameters and the desire to achieve long lifetimes has placed increased emphasis on understanding the response of flexible turbine structures in a turbulent inflow environment. One approach to increase fatigue lifetimes has been to design structures that can either shed or adequately absorb turbulent loads through the use of flexible rotors and support towers, and hubs and nacelles that exhibit multiple degrees of angular freedom. The inevitable result in such designs is a substantial increase in dynamic complexity. In order to develop a sufficient knowledge of such concepts, extensive measurements coupled with detailed analytical simulations of a flexible turbine design are required. The Wind Eagle 300 turbine, with its lightweight flexible rotor and hub, meets these criteria and is currently being investigated. In this paper we discuss a few early results from our recently completed field measurement effort. We found that the turbine rotor response was dominated by a once-per-revolution oscillation that was responsible for large cyclic variations in the output power. The available evidence points to a rotor imbalance related to structural differences in one of the blades and misalignment of the pitch angles. We also compared the variation in mean out-of-plane bending loads with wind speed with a conventional rigid hub design.

Kelley, N. D.; Wright, A. D.; Osgood, R. M.

1998-11-02T23:59:59.000Z

473

Avian risk behavior and fatalities at the Altamont Wind Resource Area: March 1998 - February 1999  

DOE Green Energy (OSTI)

Since 1981, more than 7,000 wind turbines have been installed in the Altamont Wind Resource Area in north-central California. Currently, about 5,000 turbines are operating. Past research efforts demonstrated that wind turbines frequently kill birds, especially raptors. Little is known about the specific flight and perching behaviors by birds near wind turbines. A better understanding of these interactions may one day yield insights on how to minimize bird fatalities. This Phase 1 progress report summarizes research findings obtained at 20 study plots totaling 785 turbines of various configurations and conducted between March 1998 and February 1999. The authors examined bird use and behaviors and collected data on fatalities at the same turbines throughout the course of the surveys. They completed 745 30-minute point counts (1,702 bird observations) that quantified bird risk behaviors and bird use of the study plots. The four most frequently observed bird species were red-tailed hawks, common ravens, turkey vultures, and golden eagles. During the same period, the authors recorded 95 bird fatalities. Raptors represent 51% (n=49) of the kills found. The data indicate that the relative abundance of species observed does not predict the relative frequency of fatalities per species. Phase II of the research is underway.

Thelander, C.; Rugge, L.

2000-05-08T23:59:59.000Z

474

Characterization of Epitaxial Film Silicon Solar Cells Grown on Seeded Display Glass: Preprint  

Science Conference Proceedings (OSTI)

We report characterizations of epitaxial film crystal silicon (c-Si) solar cells with open-circuit voltages (Voc) above 560 mV. The 2-um absorber cells are grown by low-temperature (EAGLE XG display glass coated with a layer-transferred (LT) Si seed. The high Voc is a result of low-defect epitaxial Si (epi-Si) growth and effective hydrogen passivation of defects. The quality of HWCVD epitaxial growth on seeded glass substrates depends on the crystallographic quality of the seed and the morphology of the epitaxial growth surface. Heterojunction devices consist of glass/c-Si LT seed/ epi n+ Si:P/epi n- Si:P/intrinsic a-Si:H/p+ a-Si:H/ITO. Similar devices grown on electronically 'dead' n+ wafers have given Voc {approx}630 mV and {approx}8% efficiency with no light trapping features. Here we study the effects of the seed surface polish on epi-Si quality, how hydrogenation influences the device character, and the dominant junction transport physics.

Young, D. L.; Grover, S.; Teplin, C.; Stradins, P.; LaSalvia, V.; Chuang, T. K.; Couillard, J. G.; Branz, H. M.

2012-06-01T23:59:59.000Z

475